[2:11] . [2:13] >> welcome, everyone, to [2:16] tonight's AUGUST 24th, 2026, [2:17] zoning hearing master hearing. [2:21] My name is steve luce and I'll [2:22] be handling tonight's hearing. [2:23] At this point in time, if we [2:25] could all rise for the pledge of [2:29] allegiance. [2:43] [Pledge of allegiance] [2:44] Thank y'all. [2:51] You MAY be seated. [2:52] At that point in time I would [2:56] like to introduce MS. Michelle [2:56] heinrich from development [2:57] services staff who will [2:59] introduce the other staff [3:01] members and go over any changes [3:03] to this evening's agenda. [3:04] Michelle? [3:04] >> thank you. [3:05] Michelle heinrich, development [3:07] services. [3:09] Up here at the dais from the [3:11] county attorney's office is [3:12] jared delfino, with the planning [3:14] commission staff we have lily [3:15] linehan, and with transportation [3:16] staff, richard perez. [3:21] And we do have some housekeeping [3:22] items to announce for anyone [3:24] who's waiting for any of the [3:26] cases. [3:27] Let me see. [3:29] We have three cases that have [3:30] been withdrawn. [3:36] Those include major mod 26-0154. [3:39] 26-0206. [3:42] And 26-0979. [3:44] And the remaining cases that [3:46] I'll announce have been [3:51] continued to the SEPTEMBER [3:59] 28th, zhm hearing 26-0215, [4:05] 26-0237, pd 26-0281, pd 26-0283, [4:14] major mod 26-0546, pd 26-0665, [4:23] pd 26-0706, major mod 26-0735, [4:25] or -- planned development [4:32] 26-0799, planned development [4:41] 26-0801, pd 26-0802, pd 26-0957, [4:46] major mod 26-970, and standard [4:49] rezoning 26-1158. [4:54] And we don't any unpublished [4:55] changes to the agenda to [4:56] announce. [4:56] >> all right. [4:58] Regarding any today's hearing is [4:59] there any any additional seating [5:01] for anyone who can't find a seat [5:02] inside this. [5:04] >> yes, we do have the overflow [5:05] room available on the first [5:06] floor. [5:06] It is the glass room when you [5:08] exit the elevator to your right. [5:10] There should be chairs and a tv [5:12] there so you can watch the [5:12] hearing. [5:13] >> okay and there is generally [5:15] enough time between applications [5:17] that they can come up when their [5:19] item is on the agenda. [5:19] >> mm-hmm. [5:20] >> okay. [5:20] >> yes. [5:21] >> very good. [5:22] I have a few instructions to [5:26] read into the record. [5:27] The county attorney's office has [5:29] a few instructions into [5:30] into read [5:31] into the record and then we will [5:32] get started with tonight's [5:32] cases. [5:35] Our hearing today -- consists of [5:36] japed items that require a [5:38] public hearing by the zoning [5:38] hearing master. [5:40] I will conduct a hearing on each [5:43] agenda item, will file a [5:46] recommendation within 15 working [5:48] days after the conclusion of [5:49] tonight's hearing. [5:50] Those recommendations are then [5:53] sent to the board of county [5:54] commissioners who will make the [5:55] final decisions. [5:57] Our hearing officering will be [5:57] informal. [5:59] I will ask questions related to [6:01] scope of direct testimony. [6:03] i MAY call and question [6:07] witnesses as I deem appropriate, [6:09] and I will decide all questions [6:09] of procedure. [6:12] I will take evidence but will [6:14] exclude evidence that is [6:16] irrelevant, immaterial or unduly [6:16] repetitious. [6:18] Evidence MAY be presented in [6:19] written form and all testimony [6:22] must be under oath. [6:23] Hearsay evidence MAY be used to [6:25] supplement or explain other [6:26] evidence but shall not b [6:30] sufficient alone to support a [6:31] finding by me unless it would be [6:33] admissible over objections in a [6:35] civil action. [6:37] Regarding the order of [6:39] presentation for each item, [6:40] first MS. Heinrich will [6:43] introduce the case on the [6:44] agenda, then the applicant and [6:45] their witnesses will have any [6:48] minutes to present their case. [6:51] And development services staff [6:52] will have five minutes to [6:53] present their case. [6:55] Then the planning commission [6:58] staff will have five minutes to [6:59] present their position. [7:00] Next, proponents, those people [7:02] in support of an application, [7:05] will have 15 minutes. [7:07] And those people opposed, the [7:08] opponents will have 15 minutes [7:08] total. [7:10] Then development services will [7:13] have an opportunity to provide [7:14] additional comments. [7:15] They have five minutes for that [7:16] purpose. [7:17] And finally, the applicant will [7:21] have five minutes for rebuttal. [7:22] Regarding the time for [7:25] proponents or opponents, the [7:27] 15-minute time frame is a total [7:29] time for each category. [7:30] If there are a number of people [7:32] to speak, we will add up the [7:36] total number of people, and the [7:38] 15 minutes will be divided as [7:38] equally as possible. [7:41] You MAY wish to designate a [7:42] single spokesperson to more [7:45] efficiently use the time. [7:46] When you come up to the podium [7:48] to speak, please start by giving [7:51] your name and address for the [7:51] record. [7:53] The meeting is being recorded [7:56] and we want mike sure we [7:58] accurate -- make sure we [7:59] accurately document who is [7:59] speaking on the record. [8:00] When you are done speaking, [8:01] please sign in with the clerk's [8:04] office with your name, address, [8:05] and the application number of [8:08] the agenda item you are speaking [8:08] to. [8:10] The pad we sign in is at the end [8:11] of the podium. [8:12] If you could raise your hand, [8:14] that's where you go to put in [8:15] your name and address and the [8:18] case you're speaking to. [8:19] At that point in time, the [8:20] county attorney's office will [8:21] have a few instructions to also [8:23] read into the record. [8:25] >> good evening, jared fell [8:26] delfino, [8:29] assistant county attorney. [8:30] Tonight's hearing is the first [8:31] step of a tw-step rezoning [8:32] process. [8:34] This is the time for applicants [8:35] andthrusted parties to present [8:36] evidence and testimony. [8:37] Any evidence presented tonight [8:38] will become part of the complete [8:39] factual record of each [8:41] application and no additional [8:42] evidence can be introduced after [8:44] the closing of an application. [8:45] The second step of the rezoning [8:49] process is a public meeting for [8:49] for -- before the board of [8:50] county commissioners where the [8:51] board will make a decision on [8:52] each application heard tonight. [8:53] Tonights' applications are [8:54] scheduled to be heard by the [8:57] board at its OCTOBER 13th, [8:59] 2026, land use meeting, unless a [9:01] different date is stated by [9:01] staff. [9:02] When considering applications, [9:03] the board will only review the [9:04] record and the recommendation [9:05] made by the land use hearing [9:08] officer for each application. [9:09] The land use hearing officer [9:10] will file a recommendation for [9:12] each application heard tonight [9:16] on SEPTEMBER 15th, 2026. [9:16] The board of county [9:17] commissioners has established a [9:18] policy that directs which [9:21] rezoning and major modifications [9:24] applications are to be placed on [9:25] the consent agenda at the [9:26] board's land use meeting. [9:28] The following applications MAY [9:29] not be placed on the consent [9:30] agenda. [9:31] One, applications that propose [9:32] to add density outside the urban [9:34] service area. [9:36] Two, applications on roadways [9:39] with failing level of service. [9:40] Applications that do not have [9:41] consistent recommendations of [9:41] approval. [9:44] And applications that have had [9:44] evidence or testimony in [9:45] opposition provided to the [9:47] record by non-applicant parties [9:49] of record, either prior to or at [9:51] tonight's public hearing. [9:52] The board will allow testimony [9:54] by any party of record at its [9:55] public meeting to consider the [9:56] land use hearing officer's [9:58] recommendation for any item on [9:59] the regular agenda. [10:01] Testimony by a party of record [10:02] shall be limited to the record [10:04] of the proceedings before the [10:07] land use hearing officer unless [10:08] additional evidence has been [10:09] found admissible in accordance [10:12] with section 10.03.04d of the [10:13] land development code. [10:15] A party of record is an [10:18] individual who fits into at [10:19] least one of the four following [10:20] categories. [10:21] First, someone who is present [10:22] tonight and presents testimony [10:23] or documentary evidence. [10:25] Second, someone who has been [10:26] certified by the U.S. Postal [10:28] service as having been mailed [10:29] notice of tonight's hearing. [10:30] Third someone who has submitted [10:31] documentary evidence to the [10:33] master file triste two business [10:34] daz -- at least two business [10:35] days prior to tonight's hearing. [10:36] Or fourth, someone who has [10:37] submitted documentary evidence [10:39] by proxy at tonight's hearing. [10:40] The content of oral argument [10:41] before the board shall be [10:42] limited to the content of the [10:43] testimony and other evidence [10:45] submitted verbally or in writing [10:47] to the land use hearing officer. [10:48] It is the role of the county [10:50] attorney's office to ensure that [10:51] only individuals who have met [10:52] these requirements are allowed [10:54] to speak before the board to [10:56] ensure that no new evidence or [10:57] testimony is introduced or [10:58] allowed at the board's public [10:59] hearing. [11:01] For these reasons, please make [11:02] sure all information you wish [11:03] the board to consider at its [11:05] public meeting is entered in [11:06] tonight's record. [11:06] Thank you. [11:08] >> okay, thank you very much. [11:10] All testimony must be provided [11:12] under oath. [11:14] Therefore, if you plan to speak [11:15] tonight, please stand and raise [11:17] your right hand so I MAY swear [11:20] you in. [11:28] [Swearing in] [11:29] Okay, thank you. [11:31] You MAY be seated. [11:32] Okay, and with that we are done [11:33] with the introductions and [11:34] instructions. [11:35] MS. Heinrich, we're ready for [11:37] the first tiem. [11:38] >> our first application is item [11:42] c.1, standard rezoning 26-1168. [11:45] The applicant is requesting to [11:46] rezone property from cg with [11:47] restrictions to cg with [11:50] restrictions. [11:51] Michelle mont ball no will [11:53] provide staff findings after [11:56] applicant's presentation. [12:04] >> the applicant, please. [12:06] >> yes, my name is larry -- do [12:08] you want me to just present [12:09] myself? [12:09] >> okay. [12:10] Go ahead. [12:12] >> okay, my name's larry [12:12] pallner. [12:17] I'm inengineer of recordf with [12:19] rc -- altmotsprings, florida. [12:22] I am here at the pleasure of the [12:23] board. [12:24] We are just removing one of the [12:26] restrictions to allow for -- [12:27] >> I'm trying to listen. [12:33] I can't listen. [12:34] >> I'm sorry, sir. [12:35] Somebody tried to speak over [12:39] you, but please proceed. [12:40] >> okay. [12:42] The purpose of this rezone is to [12:44] remove one of the restrictions. [12:48] The original restrictions on the [12:51] property were no automotive [12:53] sales, no adult shop, and no [12:54] agricultural sales of large [12:56] equipment. [12:58] We do not plan on selling large [13:02] equipment like I don't know, [13:03] giant -- or anything like that. [13:05] This is just a small business [13:07] that sells planting supplies. [13:08] But we wanted to make sure that [13:11] the restriction did not [13:12] adversely affect the business. [13:14] And that's the whole purpose of [13:15] this rezone. [13:16] >> okay, very good. [13:17] Thank you, sir. [13:21] >> you're welcome. [13:22] >> all right, and development [13:28] services staff? [13:31] >> the applicant's requesting to [13:33] revise rezoning restrictions of [13:34] existing commercial -- the [13:36] request is to remove the [13:37] language prohibiting sales and [13:38] rental of farm and gardening [13:39] equipment. [13:40] The property is currently [13:41] occupied by a farm and garden [13:42] supply center which does not [13:43] expressly permit the sales and [13:44] rental of farm and garden [13:44] equipment. [13:46] If approved, both uses would be [13:47] permitted. [13:49] The property's located on [13:50] linebaugh avenue near the [13:52] intersection of north dale mabry [13:53] with the area with commercial [13:55] and office uses. [13:57] Staff finds the rezoning [13:57] supportable. [13:58] I'm available if you have any [13:59] questions. [13:59] >> no questions. [14:00] Thank you. [14:04] And planning commission staff? [14:05] >> lilyann linehan, planning [14:06] commission stat. [14:06] The subject property is within [14:08] the office commercial 20 future [14:09] land use category. [14:10] It's within the urban service [14:11] area and located within the [14:12] limits of the greater [14:13] carrollwood northdale community [14:14] plan. [14:16] It is currently developed with [14:17] commercial uses and surrounded [14:19] by mainly heavy an light [14:20] commercial uses, near the west [14:22] linebaugh avenue north dale [14:24] mabry highway intersection. [14:25] And in the surrounding area the [14:28] land use is consists of the [14:28] primarily commercial development [14:30] with some public, quasi-public [14:31] institutional and residential [14:32] uses to the east and west of the [14:32] site. [14:34] And there are some light [14:35] industrial uses located to the [14:35] south. [14:36] Collectively these existing land [14:39] use patterns establishes a [14:40] predominantly commercial context [14:42] that supports the proposed [14:42] rezoning. [14:43] It's compatible with the [14:44] surrounding area and consistent [14:47] with flu's objective 3.1 and [14:49] policy 3.1.3, which require [14:50] developments to be compatible [14:52] with the surrounding areas. [14:54] It also satisfies the intent of [14:56] flu's objective 4.4 and policy [14:57] 4.4.1, which require new [14:58] development to be compatible [14:59] with the surrounding [15:00] neighborhood. [15:01] The removal of the restriction [15:02] for the sale of farm and garden [15:04] equipment will not negatively [15:05] impact the surrounding [15:06] neighborhood, which consists of [15:08] heavy and light commercial uses, [15:09] and the applicant is stilt [15:10] leaving the other original -- [15:13] still leaving the other original [15:14] restrictions, domestic vehicles, [15:15] pleasure craft, hobby vehicles [15:17] and prohibits sexually oriented [15:17] business. [15:18] And the original planning [15:19] commission findings were [15:20] contingent upon these [15:21] restrictions. [15:23] The addition of farm and garden [15:23] equipment sales will further the [15:25] operation of the existing [15:26] agricultural plant nursery, and [15:27] would result in compatible [15:28] development. [15:30] And lastly, the addition of the [15:31] sale of farm and garden [15:32] equipment is supported by [15:35] several policies under objective [15:37] 5.1, which state that in [15:38] recognition of the importance of [15:40] agricultural as an industry and [15:41] a valuable economic resource, [15:42] that hillsborough county shall [15:44] promote the economic viability [15:45] of agricultural activities by [15:47] recognizing and providing for [15:48] its unique characteristics and [15:49] land use planning and land [15:51] development regulations. [15:52] So based upon the above [15:54] considerations, the following [15:55] goals, objectives and policies, [15:56] planning commission staff finds [15:57] the proposed rezoning consistent [15:58] with the unincorporated [15:59] hillsborough county [16:00] comprehensive plan, subject to [16:01] the restrictions proposed by [16:03] development services department. [16:04] >> thank you. [16:06] At this point in time s [16:07] , is there [16:08] anyone in the audience that [16:09] wishes to speak in support of [16:12] the application? [16:14] Seeing no one responding, anyone [16:16] in the audience wish to speak in [16:21] opposition to the application? [16:23] Seeingnone responding, staff, [16:24] anything further? [16:26] >> no, sir. [16:29] >> applicant, opportunity for [16:30] rebuttal. [16:40] Sir, are you good? [16:42] All right. [16:43] I don't know what happened to [16:44] him, but I think we're good on [16:46] this one. [16:46] Okay. [16:47] >> I have no rebuttal. [16:48] i'm sorry. [16:49] >> [Laughter] [16:49] >> okay. [16:51] Thank you. [16:52] All right, with that that [16:54] concludes this application. [16:55] MS. Heinrich, we're ready for [16:55] the next item. [16:57] >> our next application is item [17:01] c.2, standard rezoning 26-1184. [17:03] The applicant is requesting to [17:07] rezone property from as-1 to [17:07] rsc-9 [17:09] rsc-9 with eare strictions. [17:10] Sierra janes [17:15] jane?Eetion good [17:17] evening, kami corbett, suite [17:18] 1100, tampa, florida. [17:20] Here representing mattamy [17:20] homes [17:20] . [17:22] This is pretty straightforward. [17:24] This is a standard rezoning [17:25] request to rsc-9 restricted. [17:27] The restriction is to the four [17:28] units to the acre that's allowed [17:31] by the comprehensive plan. [17:34] The site that's outlined and [17:34] dashicide [17:36] dashed is actually a site we [17:37] rezoned earlier rast year, and [17:38] this is a continuation of that. [17:41] You can just see this exhibit. [17:45] We're going from as-1 to rsc-9 [17:46] restricted. [17:52] We have minimum lot widths of 50 feet, I'm sorry, 60 feet with [17:53] 7200-foot lots. [17:56] And a maximum density of four [17:57] dwelling units per acre. [17:58] These are some examples of the [18:00] product that mattamy builds. [18:02] They do a really nice job. [18:03] Staff has found this consistent [18:04] and compatible with the [18:05] comprehensive plan and the land [18:07] development code, and we have no [18:08] objections from any reviewing [18:09] agencies and we're herer [18:11] here to [18:12] answer any questions should you [18:13] have any. [18:14] >> no questions, thank you. [18:20] Development services staff? [18:21] >> good evening. [18:22] Sierra james with development [18:22] services. [18:24] The applicant is requesting to [18:26] rezone the site from as-1 to [18:29] rsc-9 with the following [18:30] applicant proposed restrictions. [18:32] Development will pee limited to [18:33] four de -- be limited to four [18:35] dwelling units per acre. [18:38] 7,200 square feet minimum lot [18:40] feet, and -- the subject site is [18:41] located within the riverview [18:43] community plan area off [18:44] raulerson road. [18:45] Much of the surrounding area [18:46] consists of single-family [18:48] residential uses, notably [18:51] properties to the north are [18:52] zoned rsc-9 with similar [18:53] restrictions. [18:54] Based on these considerations, [18:56] staff find the proposed rezoning [18:56] approvable. [18:57] >> yeah, thank you. [18:58] >> thank you. [18:58] >> all right, planning [19:01] commission staff. [19:02] >> lilyann linehan, planning [19:03] commission staff. [19:04] The subject property is located [19:05] within the residential 4 [19:07] louisiana category, is -- land [19:09] use category, within the urban [19:10] service area. [19:11] >> andrew ross: and -- the [19:12] intent of the residential 4 [19:15] category is for low density [19:16] residential development, which [19:18] aligns with the proposed use for [19:20] single-family detached units. [19:21] The maximum potential under this [19:24] category is four dwelling units [19:25] per grows acre and the maximum [19:26] nonresidential development [19:28] palings is 0.25 far. [19:30] The planning commissiongisted [19:31] to add a restriction to the [19:32] wrezoning which would limit the [19:34] residential development to a [19:35] maximum of four dwelling units [19:37] and align with the residential 4 [19:38] future land use category. [19:40] The applicant agreed to add this [19:41] restriction which made a total [19:42] of three restrictions. [19:44] The other two include a minimum [19:45] lot width of 60 feet and to have [19:49] a minimum lot area of 7,207 [19:50] square feet. [19:51] The surrounding land use site [19:53] pattern consists primarily of [19:54] residential uses with some [19:55] agricultural land to the north [19:57] and this request would provide a [19:57] compatible use that is [19:58] consistent with the surrounding [19:59] residential uses and existing [20:00] character. [20:02] And is consistent with objective [20:05] 3.1 and its associated related [20:06] policies. [20:08] The surrounding zoning pattern [20:09] consists of agricultural-rural [20:12] to the east, rsc-3 to the south, [20:13] as-1 to the west, and rsc-9 to [20:15] the north. [20:17] This requested rezoning from [20:19] as-1 to the rsc-9 restricted is [20:20] consistent with the existing [20:22] zoning and development pattern [20:23] in the vicinity and therefore [20:26] the request is consistent with [20:28] objective 4.4 and policy 4.4.1. [20:29] And lastly the site is within [20:31] the riverview community plan, [20:32] which desires to reflect the [20:34] vision of the riverview district [20:35] concept map. [20:36] It is within the residential [20:38] district on this map, which [20:39] encourages residential [20:40] development that complements the [20:42] sounderring area. [20:43] Surrounding area and promotes [20:43] housing diversity. [20:45] The request would provide [20:46] additional housing opportunities [20:47] in an area already [20:49] characterizedases a residential [20:49] district. [20:51] So based upon these [20:52] considerations, planning [20:53] commission staff finds the [20:53] proposed planned development [20:55] consistent with the [20:56] unincorporated hillsborough [20:56] county comprehensive plan, [20:58] subject to the conditions [20:59] proposed by the development [21:00] services department. [21:00] >> okay. [21:01] Thank you. [21:04] At that point, is there anyone [21:05] in the audience that wishes to [21:07] speak in support of the [21:10] application? [21:11] Seeing no one responding, anyone [21:14] in the audience wish to speak in [21:15] opposition to the application? [21:17] >> yes, please. [21:20] >> yes, ma'am. [21:26] >> mary iamb pieri, can you hear [21:26] me? [21:27] >> yes. [21:28] >> okay. [21:29] Mute the tv. [21:32] Sorry. [21:35] We had a meet and greet with the [21:36] consultants, and the builders, [21:37] which was wonderful. [21:40] Answered a lot of our questions. [21:41] Just want to kind of make sure [21:45] that they're going to stick to [21:46] the plan since the other three [21:47] developments in the area have [21:49] not stuck to the plan. [21:50] I got to lower this. [21:52] I'm sorry. [21:54] We want to make sure she did [21:56] mention raulerson road. [21:57] We want to make sure that there [22:00] is no egress to raulerson road [22:02] other than the emergency locked [22:03] entrance. [22:06] That was very important to us. [22:08] We want to make sure that that's [22:08] for sure. [22:09] Actually I think I'm the only [22:10] one that going to be here [22:11] because everybody's feeling [22:12] totally defeated again since [22:15] this is our third neighborhood. [22:18] We wanted to have the street [22:20] lights to be covered at the top [22:22] and pointing down into their [22:22] roadway. [22:23] Quy discussed that with the [22:24] builder also. [22:26] We wanted requesting an [22:33] eight-foot fence between [22:34] their properties and outs [22:36] instead of the six -- ours [22:38] instead of the six-foot one. [22:39] Compliance is another issue we [22:39] continue to have a problem with [22:40] in all of these developments [22:44] that back up to our rural [22:45] acreage. [22:46] They need to comply with the [22:49] work days and times, including [22:50] there crews that they hire, the [22:54] construction crews, the roofers, [22:56] not landscapers, the concrete [22:58] trucks, the framing crews. [22:59] Been quite the problem in the [23:00] past, and we're going to be [23:01] doing this for another two years [23:06] since this project is the [23:08] 11 acres, the other project is [23:10] the first phase, which backs up [23:12] to it. [23:13] Anyhow, regardless we want to [23:14] make sure that they're going to [23:16] honor what they're supposed to [23:17] honor. [23:19] They weren't sure about if they [23:20] were utilizing natural gas or [23:20] not. [23:24] We were curious about that. [23:25] I don't know if that'll get [23:25] answered later. [23:30] We do have issues about the [23:30] density. [23:32] Are schools are at just about [23:32] full capacity. [23:34] We gave them a copy of all of [23:35] those percentages. [23:40] We have six schools in this area [23:41] right across the street from [23:41] each other. [23:42] Blah blah blah. [23:43] It's tearable to get in and out [23:43] of here. [23:45] You can't until after the school [23:51] buses are gone. [23:53] We're hoping that that gets [23:53] addressed. [23:55] We don't know how but we're [23:57] hoping that gets a second look. [23:58] The drilling of the wells, if [24:00] they're drilling any wells for [24:01] reclaimed sprinklers, one of the [24:02] neighbors just mentioned that, [24:05] and I thought that was discussed [24:06] they weren't going to have any [24:07] wells on that property. [24:08] Our wells have never been the [24:10] same since they -- last two [24:11] neighborhoods in. [24:12] A few of them have collapsed. [24:13] We've had to pull them up. [24:16] We've had to redrill. [24:19] Very expensive. [24:22] Pump stations are a concern. [24:23] There [24:24] the new neighborhoods that are [24:25] all around our acreage, they [24:26] have a pump station but they're [24:28] not muntered 24 hours day -- [24:30] monitored 24 hours a day, so we [24:32] could go a day and a half, two [24:34] day the sirens going off from [24:36] their pumpstition [24:37] pump stations. [24:38] I understand phase 1 and phase 2 [24:39] are going to have separate pump [24:41] stations, so that of course is [24:43] another concern. [24:45] Just a curious question about [24:48] the notices. [24:49] Like they just said this was [24:50] done a year ago. [24:52] We got a notice put on the [24:53] street JULY 15th. [24:55] That was the first notice that [24:56] we all saw. [24:57] inletters came shortly after [25:00] that. [25:01] I guess I can call the county [25:04] tomorrow and find out about how [25:06] many other notices they put up [25:08] last year here and at the cat [25:12] house project. [25:13] I'm the only one here because [25:16] everybody's feeling pretty [25:20] voiceless and bulldozed over. [25:22] We used to be country. [25:24] We have a little one-lane dead [25:25] end road we live on. [25:28] We can't get off our property [25:29] onto boyette road either. [25:30] Takes forever if you want to go [25:33] out and go in a different [25:33] direction. [25:34] Was hoping all this building [25:36] wasn't going to keep happening [25:38] and hit out here for at least [25:40] ten more years. [25:42] Not much property left since we [25:44] just drove down the road and saw [25:45] the girl scout camp has sold [25:50] more property. [25:51] There was no notice for that. [25:52] Nobody saw any signs for that [25:53] but it looks like it's going to [25:54] be quite a big project down [25:57] there too. [25:59] So we've lost our overall area. [26:00] We're very, very concerned about [26:03] the wildlife, the turtles. [26:05] We have a number of foxes, [26:10] coyotes, armadillos, possums, [26:11] raccoons, the bocat we have not [26:14] seen him for quite awhile now. [26:14] One of the other neighbors on [26:16] the adjoining properties to this [26:17] on hill crest they were [26:19] concerneduct the drainage to [26:21] their property also since these [26:22] homes are going to be at a [26:29] higher elevation than theirs. [26:30] I thank you for your time and [26:31] consideration, and I just hope [26:32] the county just keeps following [26:34] policy and doesn't just let [26:35] these buildings bulldoze over [26:35] them. [26:36] Thank you for your time. [26:37] >> thank you, ma'am. [26:38] Is there anyone else in the [26:45] audience that wishes to speak in [26:45] opposition? [26:46] Seeing no one responding, staff, [26:50] anything further? [26:51] >> I'll just note for the [26:54] citizen who just spoke, we don't [26:56] have any restrictions in regards [26:57] to some of the items that she [26:58] talked about. [27:01] Just to let her know and [27:04] specifically in terms of the [27:07] emergency access, and where that [27:09] might be if it's necessary, and [27:13] anything with a perimeter fence. [27:14] I know he shengzed [27:16] she mentioned eight feet. [27:17] The highest you can go is six [27:20] feet unless you obtain a [27:20] variance. [27:21] >> cay. [27:25] To clarify, it's a request for [27:26] euclidian zoning, right. [27:27] >> yes. [27:27] >> it's not a planned [27:28] development, right? [27:28] >> correct. [27:30] >> that's why you only addressed [27:33] a few items. [27:34] >> correct. [27:34] >> okay. [27:35] Very good. [27:35] Thank you. [27:36] At this point in time, the [27:40] applicant has an opportunity for [27:40] rebuttal. [27:41] >> I think I would just say as [27:43] you are aware and as the county [27:45] is aware, a lot of the issues [27:48] with respect to access and [27:49] drainage and those types of [27:50] things happen at site [27:52] development, and we're happy to [27:54] keep a dialogue going with the [27:55] neighborhood. [27:57] The builder actually did the [27:57] community meeting, and they [27:58] would continue to meet with the [28:00] community and try to address any [28:01] concerns that they have. [28:03] With that we don't anything [28:03] further to offer. [28:04] >> all right, very good, thank [28:06] you, ma'am. [28:08] With that, that concludes this [28:10] item. [28:11] MS. Heinrich, we're ready if the [28:12] next case. [28:14] >> -- for the next case. [28:15] >> next item is major mod [28:16] application 26-00 [28:17] 0062. [28:18] The applicant is requesting a [28:23] major modification to pd [28:24] 77-0123. [28:25] Sam ball with development [28:27] services has reviewed this and [28:28] will provide staff findings [28:29] after the applicant fts [28:34] ppresentation. [28:38] >> good even, MR. Luce, tiler [28:41] hudson, 400 north ashly drive. [28:42] Going to go ahead and jump into [28:43] a powerpoint. [28:45] The site is located just sort of [28:47] behind a publix, behind public [28:51] storage and general retail [28:53] commercial cluster. [28:54] Apollo beach boulevard. [28:54] Nine acres. [28:57] This is a part of dri59, [28:59] specifically this is in pocket [29:00] 62b, so a lot going on in this [29:04] dri from 1979. [29:06] The project we're proposing is [29:07] a multifamily apartment building [29:10] four stories in height, 237 [29:12] total units with access off of [29:13] apollo beach boulevard, this [29:16] would really sit sort of [29:17] squarely in the green pastural [29:20] land behind the publix right [29:20] now. [29:22] We are not in much of a dispute [29:23] with staff about the things that [29:25] typically cause disputes in [29:27] these chambers, which are things [29:30] about compatibility or even the [29:31] use of multifamily. [29:34] This is really a fairly ideal [29:35] multifamily infill site. [29:36] Not really fighting about [29:37] height. [29:40] We're not really in disagreement [29:42] about buffers, screening, things [29:44] like that. [29:45] After some time, we are I think [29:47] no longer in disagreement about [29:48] the administrative variances and [29:50] design exceptions that the staff [29:54] report indicated those were [29:55] recommended for disapproval, but [29:57] I believe that has been squared [29:58] away. [30:00] What we are disputing is about a [30:01] couple of words in the dri [30:03] development order, so of course [30:05] the apollo beach dri was [30:06] implemented through a [30:08] development order resolution in [30:10] 1979 as typical for DRIs of [30:11] that vintage it's been amended a [30:14] couple of times. [30:15] But the section on trip [30:16] generation has not been. [30:19] Like most DRIs, the coin of [30:23] the realm is -- trips. [30:24] That is the -- and while there [30:26] is a reference in the context of [30:30] land use exchanges to [30:31] referencing equivalent trip [30:34] generation based on ite, we [30:35] don't dispute that ite is the [30:36] correct what. [30:37] That is what you should be [30:39] looking for the trip genraigz [30:41] numbers. [30:45] The dispute we have is that [30:46] staff -- the reason that's [30:47] problematic for us, and steve [30:49] henry is going to speak about [30:50] this in greater depth is there [30:52] is no A.M. Trip baseline in the [30:53] development order. [30:55] We have a bundle of vested [30:56] rights arising from the [30:57] ownership of the property going [31:00] back to 1979 nat [31:02] 1979 that said that P.M. [31:04] Trips are how you alculate these [31:05] conversions. [31:07] So we're talking about apples. [31:09] Staff is asking us to consider [31:09] orfgz. [31:11] Orange are good but they have no [31:12] business in affecting the [31:14] conversion we're seeking here by [31:14] this. [31:15] So yald [31:18] I would ask steve to touch on [31:19] a couple of the points on the [31:20] slide, and then I will be bak [31:23] to wrab it up. [31:24] >> okay. [31:27] >> good evening, steve henry, [31:30] tmc, 5023 west laurel, tampa, [31:30] 33607. [31:33] As tyler had indicated, talked [31:34] to you a little bit about the [31:34] traffic. [31:37] So the reality is we actually [31:39] did the original traffic [31:42] analysis for apollo beach. [31:44] We did the phase 2, phase 3 [31:44] analysis. [31:46] All those were based on the P.M. [31:47] Peak hour. [31:49] I [31:51] I've actually got a cape of the [31:52] analysis we can enter -- copy of [31:54] the analysis we can enter into [31:55] the record if need be. [31:56] But in addition to that we did [31:59] the dj farms dri analysis that [32:01] was based on P.M. Peak hour. [32:05] We updated the loom based on [32:05] P.M. Peak hour. [32:08] We also did the southshore dri, [32:09] which was also we updated the [32:11] loom for that one. [32:13] Had based on P.M. Peak hour. [32:18] So the reality is when you're [32:19] looking at the trips associated [32:20] with it, the analysis for all [32:23] DRIs are based on P.M. Peak [32:23] hour. [32:25] So now to be asked to do A.M., [32:26] the staff had to actually go [32:29] through an analysis to determine [32:30] what A.M. Trips were even [32:32] supposed to be analyzing since [32:33] they weren't in the dri. [32:34] So from our standpoint we [32:38] believe the P.M. Peak hour is [32:39] the reasonable equiv whreans for [32:41] the purposes of -- equivalency [32:43] for the purposes of evaluating [32:45] land use equivalencies. [32:46] >> okay. [32:51] >> thank you. [32:54] >> and that slide just says what [32:55] steve just said. [32:57] So the way the dominoes have [32:59] fallen here is we have some [33:01] staff opposition to this [33:02] request: really comes down from [33:03] a very narrow basis which is [33:05] what's the appropriate exchange [33:11] methodology for a 1979dri that [33:16] only provides for P.M. Trips for [33:17] the coin of realm. [33:18] What we have proposed to do we [33:20] think this is redundant. [33:21] We think it's not necessary but [33:23] we have file [33:24] filed a D.O. Amendment [33:26] to say what we think it already [33:27] says, which is that when we talk [33:31] about these land use exchanges, [33:35] it's about P.M. Trips as [33:35] provided in the original [33:36] development order. [33:38] I think if that is approved [33:39] whether staff recommends its [33:40] approval is a separate thing. [33:42] If that were approved that would [33:43] allay any doubt here, but again [33:47] we just see this as just an add [33:49] on cures mechanism. [33:52] We do dispute the premise that [33:53] A.M. Peak trips have anything to [33:53] do. [33:54] That's completely irrelevant to [33:55] staff's analysis on the [34:00] conversion, so with that, I will [34:02] just note in closing this is a [34:03] pretty substantial impact fee [34:05] generator for the sieflt this [34:05] is. [34:06] Site. [34:07] This is an infill housing, there [34:08] is multifamily in the periphery. [34:10] It is a blank piece of land near [34:11] a maimer road behind a publix [34:13] and some employment centers. [34:14] With that, appreciate your time. [34:15] Thank you. [34:17] >> yeah, if I could, because [34:20] read the staff report, and [34:21] they're taking the position, [34:22] maybe it's information you [34:23] tbroided to [34:25] provided to them, that the site [34:29] is currently entitled for I [34:32] don't know, 34, 35,000 square [34:33] feet of retail. [34:34] >> that's what we're seeking to [34:35] convert. [34:38] We're seeking to convert 35,000. [34:41] >> that's what you think the [34:45] entitlements are on this [34:45] 9.48 acres. [34:47] >> correct, converting that [34:48] to -- units 72 so if you [34:49] . [34:51] >> so if you could, or steeive [34:53] henry, walk me through how you [34:54] get from the 35,000 square feet [35:14] of retail to 237 units? [35:15] >> well, the staff had done it [35:17] based on P.M. Peak hour. [35:18] But what they also then looked [35:19] at was A.M. Peak hour. [35:21] So the P.M. Peak hour gets us [35:22] where we want to be. [35:23] >> explain that to me. [35:28] Walk me through that. [35:29] >> okay. [35:31] And I will, because we didn't [35:32] actually that. [35:34] Those were done by staff. [35:41] So I will pull that out here. [35:42] But essentially what staff was [35:44] looking at was, and they were [35:47] looking at both the inbound and [35:48] outbound trips, and then you [35:50] look at the equivalency of those [35:53] trips to get there. [35:55] And again I will have to go [35:55] through the number. [35:56] Really it was a matter of from [35:59] our standpoint we were asked to [36:01] look at what's the reasonable [36:02] rate? [36:03] Was it P.M.? [36:04] A.M.? [36:05] We were asked to look at that so [36:06] I have actually run through the [36:06] numbers. [36:08] I'm happy to do that. [36:10] >> all right, well let's back up [36:12] a step then and just [36:12] intuitively. [36:15] You've done traffic for a while. [36:15] >> yes. [36:17] >> 35,000 square feet of retail [36:24] is that equivalent to 237 units? [36:25] >> yes, again, P.M. Peak hour [36:27] when you look at the gross [36:28] trips, that would be probably [36:29] equiv [36:31] quivalency. [36:32] >> okay. [36:33] >> and again I'm happy to look [36:34] at the numbers again because we [36:40] were just simply looking at what [36:41] was the reasonable, A.M. Or [36:43] P.M., so dwrid [36:44] I didn't run through [36:46] the actual calculations. [36:46] I can do that. [36:49] >> can I ask the county staff, [36:51] transportation planner the same [36:52] question, maybe you come back on [36:54] rebuttal and show me the math. [36:55] >> sure, absolutely. [36:56] We can definitely do that. [36:59] >> very good. [37:00] Thanks. [37:02] Does that conclude, MR. Hudson, [37:03] your presentation? [37:05] All right, at this point in [37:10] time, development services [37:10] staff. [37:11] >> good evenings sam ball with [37:12] hillsborough county development [37:15] services. [37:17] the applicant is requesting a [37:18] major modification to pocket [37:21] scob of pd 77-0123 to allow for [37:23] the development of 237 [37:25] multifamily dwellings through an [37:27] exchange of commercial or office [37:28] use entitlements. [37:30] This application is being heard [37:31] concurrentdly [37:33] concurrently with a modification [37:36] to the apollo beach dri under [37:38] dri do26-2245. [37:40] The subject property is located [37:43] in the apollo beach community [37:44] planning area. [37:46] The development site adjoined [37:48] properties within the same pd on [37:50] all sides which are approved and [37:51] developed for a mix of office [37:55] and commercial uses that include [37:56] retail, light industrial, and [37:58] mini warehousing. [38:00] Additional uses in the area [38:03] include a religious institution, [38:05] multifamily, single-family, [38:09] conventional single-family [38:10] dwellings, multiuser office [38:12] complex and a mobile home park. [38:18] Balkt 62b is approved for 4 -- [38:18] commercial or office square foot [38:19] use. [38:21] The proposes [38:28] -- allowing for the 237multifamily dwellings and [38:29] established vehicular and [38:31] pedestrian access points along [38:33] apollo beach boulevard and [38:34] pedestrian cross-access for the [38:35] property located to the north [38:38] and south. [38:40] The application includes a p [38:41] dvariation request to the [38:41] buffering and screening [38:44] requirements of ldc section [38:46] 60606, that if approved would [38:47] reduce the required buffer and [38:49] screening permits from a 30-foot [38:51] c to a 10-foot b between the [38:52] proposed building envelope and [38:53] the light industrial site to the [38:54] north. [38:55] the activities associated with [38:57] the light industrial use to the [38:59] north are contained within a [39:01] structure position of [39:02] approximately 120 feet north of [39:03] the property boundary. [39:05] The manufacturing -- the [39:06] industrial facility to the north [39:09] is also gened from the subject [39:10] property -- developed from [39:11] subject property dense [39:12] vegetation and protected [39:12] wetlands. [39:15] The load docks of the industrial [39:17] facilities are located more than [39:18] 275 feet from the proposed [39:20] development, and are are [39:22] oriented towards the opposite [39:23] direction. [39:24] Based on these findings, staff [39:28] finds the approval of, finds [39:30] that the approval of the [39:31] requested waiver will have [39:32] minimal impacts. [39:33] Staff finds the proposed [39:34] development compatible with the [39:36] area based on zoning and [39:37] development pattern in the area, [39:40] and the above considerations. [39:41] However, there proposed number [39:42] of residential units would be [39:43] provided through a conversion of [39:44] commercial entitlements to [39:47] residential entitlements as [39:47] provided for [39:50] for in the appaleo [39:50] beach dri. [39:53] The trip exchange requires at [39:54] least 310,003 square feet [39:56] instead of the 34,511 square [39:58] feet proposed buy applicant due [40:01] to directional daily inbound and [40:02] outbound directional A.M. And [40:04] inbound and directional P.M. [40:06] Inbound trips. [40:07] Due to this final consideration, [40:09] staff finds the request not [40:10] supportable. [40:11] That concludes my presentation [40:14] if you have any questions. [40:15] >> okay. [40:18] Only with regard to traffic. [40:19] So I would like to hear from the [40:21] transportation planner for the [40:22] county. [40:23] >> okay. [40:24] James ratliff. [40:24] >> okay. [40:27] Thank you. [40:28] >> good evening, james ratliff, [40:30] development services, [40:30] transportation -- [40:32] >> same question unless you have [40:34] other comments you want to make, [40:35] but the question I had for the [40:37] applicant's transportation [40:38] planner, show me the math. [40:40] How do you get from 34,511 [40:44] square feet of retail to 237 [40:46] multifamily units. [40:47] >> sure. [40:48] Let me start by saying I think [40:49] you asked the question whether [40:51] the things they were presenting [40:52] about how the other projects had [40:54] been done, dg farms, was [40:55] something that was presented to [40:56] us. [40:57] That data was provided. [41:00] This went up to the director of [41:01] development review which [41:02] essentially interpreted what the [41:03] development order states in [41:04] terms of how we would analyze [41:05] this project. [41:07] They also then I believe cept [41:08] that information to the county [41:11] attorney's office who again [41:15] agreed with staff's [41:15] interpretation of how the [41:16] development order reads so not [41:18] with responding what was done in [41:19] those other projects we have to [41:19] review this project based on [41:21] what this development order [41:21] says. [41:22] Not what's usual or customary [41:26] but what was approved. [41:28] So in terms of the map, let's [41:30] see, I haven't used this thing [41:31] in about 20 years. [41:33] >> sorry, you haveilatal [41:34] you have a little [41:35] homework. [41:36] I gave the other side homework [41:36] too. [41:51] >> and going to need to zoom. [41:52] Okay. [41:55] So if that's hopefully you can [41:57] see that. [41:58] Sales this is essentially a [42:00] two-part problem. [42:02] So the first part is the [42:03] exchange of equivalent uses, and [42:04] then the second part of the [42:07] problem is assuming that the [42:08] exchange was done correctly, [42:10] kind of a subpart to the [42:13] question, is do they control the [42:15] entitlements necessary to [42:16] effectuate the exchange. [42:17] And the third or main problem is [42:19] does that exchange violate the [42:20] trip cap. [42:23] So those are kind of separate [42:24] but related issues. [42:27] And in the dri development order [42:28] again it introduces this concept [42:31] for this particular dri of [42:32] directional equivalency, and the [42:34] tripp cap only looks at P.M. [42:36] Peak hour. [42:37] But with regard to the exchange, [42:41] we look at all three periods and [42:42] directional equivalency as well. [42:44] So what you can see here is this [42:45] first line basically shows what [42:47] they're proposing to exchanger [42:52] too, which is 237 dwelling [42:53] units of apartments four stories [42:54] or higher and that's an [42:55] important consideration because [42:56] the particular code they used [42:57] higher the apartments are, the [42:58] lower the traffic they generate [43:00] per unit. [43:02] So that's what that first line [43:03] is showing. [43:05] The next line is essentially [43:08] taking of the 870,464 square [43:10] feet of commercial entitlements, [43:12] we said well, how much do we [43:13] have to reduce that number by in [43:18] order to achieve equiverancy inquiv lane in [43:19] all three team pire I understand [43:21] in -- periods in both the [43:24] inbound and outbound. [43:26] Average daily equivalency [43:27] inbound and outbound, so on and [43:28] so forth. [43:29] So it took quite a bit of [43:32] nonresidential entitlements to [43:36] achieve an A.M. Peak hour [43:36] equivalency. [43:37] And that's because the code that [43:40] was utilized when the code was [43:41] studied, generates a relatively [43:44] lower number, you know, of [43:46] outbound A.M. Trips. [43:48] So in order to get the number [43:50] and of outbound A.M. Trips to be [43:51] equivalent for residential, [43:54] which generates right a lot of [43:55] outbound A.M. Trips everybody's [43:55] leaving for work in the morning [43:59] you have to exchange 310,364 [44:02] square feet in order to achieve [44:04] that outbound equivalency. [44:04] In [44:06] >> okay, so that's what you're [44:07] saying. [44:09] You're saying they have to [44:10] exchange 310,000 square feet of [44:14] retail to get to 237 units. [44:15] >> correct, and it's all because [44:17] of this one column right here, [44:19] which is the outbound, in order [44:22] to get that 71 units, to be [44:23] equivalent, right you have a lot [44:24] of overage in these other [44:28] categories, it's that one [44:29] directional equiv [44:30] quivalency in the [44:33] A.M. Outbound nat that was the [44:34] controlling factor. [44:34] >> got it. [44:34] Okay. [44:35] I understand. [44:38] >> and then the second part of [44:39] the test was assuming they had [44:41] the entitlements to exchange and [44:43] they could do that, then how [44:47] does it interact with the trip [44:48] cap. [44:49] So and according to this it [44:51] would exceed the cap by 10 [44:51] trips. [44:52] He mentioned that you know they [44:54] were looking at a potential do [44:56] element as a curative mechanism [44:57] I believe, but again that's not [44:59] of record as of now so we [45:02] reviewed this case based on [45:04] what's currently being proposed, [45:06] and you know, possibility we [45:08] wouldn't support that even if [45:09] proposed but the point being [45:10] it's not being proposed [45:11] currently so we're reviewing it [45:13] as it currently sits. [45:14] >> okay. [45:14] All right. [45:15] That's helpful. [45:17] Thank you. [45:17] >> sure. [45:18] >> at this point in time, [45:22] planning commission staff. [45:23] >> lillian line 00, planning [45:23] commission staff. [45:25] The site is designated office [45:26] commercial 20 on the future land [45:28] use map and is within the urban [45:29] service area and within the [45:31] limits of the apollo beach [45:33] community plan and southshore [45:34] area-wide systems plan. [45:35] Site's also part of a [45:36] development of regional impact [45:38] development order, and planning [45:40] commission staff finding is cub [45:42] tingance upon the application [45:44] being in compliance with the [45:44] dri. [45:45] The intent of the office [45:47] commercial 20 category is to [45:48] accommodate commercial and [45:49] office development while still [45:51] allowing for the consideration [45:52] of compatible residential uses [45:54] and the proposed residential [45:55] development exceeds the base [45:57] density of the 20 dwelling units [45:59] per acre allowed under this [45:59] category. [46:01] However, because of the dri, the [46:02] proposed units utilize a portion [46:04] of the remaining residential [46:05] entitlements, and there [46:06] therefore the [46:07] proposal is consistent with the [46:08] intent of the oc-20 category, [46:10] subject to its compliance with [46:12] the dri. [46:15] Flu's objective 1.1 and of the [46:16] future land use section directs [46:19] 80% of the county's growth into [46:20] the urban service area, and [46:22] flu's policy 3.1.3 requires new [46:23] development to be compatible [46:25] with the surrounding uses. [46:25] The proposed residential [46:26] development is compatible with [46:28] the surrounding development [46:30] pattern, which includes light [46:31] industrial and commercial uses [46:32] with residential development [46:34] farther west along apollo beach [46:35] boulevard. [46:37] Proposed development also meets [46:40] the intent of flu's objective [46:42] 4.4, policies 4.4.1, regarding [46:43] compatibility with surrounding [46:44] neighborhoods, while the apollo [46:46] beach community plan discourages [46:47] residential development that [46:49] exceeds 50 feet in height, the [46:50] subject site is located within [46:52] an intensive future land use [46:54] designation of office commercial [46:56] 20 and an established commercial [46:56] node. [46:58] Given the surrounding commercial [46:59] intensity and the location along [47:01] apollo beach boulevard and U.S. [47:02] Highway 41, the proposed [47:03] building height is considered [47:05] compatible with the surrounding [47:06] area. [47:08] And lastly, the major -- [47:09] proposed major modification is [47:10] consistent with the vision of [47:11] the apollo beach community plan [47:13] and southshore area-wide systems [47:14] plans, by supporting development [47:16] within an established activity [47:18] center, and providing additional [47:19] residential opportunities in an [47:21] area served by existing urban [47:22] infrastructure. [47:23] So based upon these [47:24] considerations, planning [47:26] commission staff finds the [47:28] proposed major modification [47:30] consistent with the [47:31] unincorporated hillsborough [47:31] county comprehensive plan [47:33] subject to conditions proposed [47:34] by development services and in [47:35] compliants with the requirements [47:36] of the dri. [47:40] >> okay, thank you. [47:41] All right at this in time, is [47:44] there anyone in the audience [47:45] that wishes to speak in support [47:48] of the application? [47:49] No one responding. [47:50] Anyone in the audience wish to [47:52] speak in opposition to the [47:53] application? [47:54] >> good evening, chair. [47:55] I believe we have eight people [47:59] signed up online to speak. [48:00] >> okay. [48:05] First person, please proceed. [48:06] >> brad, are you able to hear [48:07] me? [48:09] >> I am, is I'm sorry, I didn't [48:09] know I was first. [48:12] My name is brad ahlgren a [48:14] business owner at 208 apollo [48:17] beach boulevard, about 350 feet [48:18] southeast of the proposed [48:20] development. [48:22] And as I've said on the record, [48:24] that I've submitted, I'm not [48:25] opposed to progress. [48:29] I'm not opposed to improvements, [48:32] however, I believe this [48:33] application would be to the [48:36] detriment of the community, and [48:38] a few things were said tonight [48:39] that the applicant was not [48:41] really in opposition to the [48:42] staff on heights and setbacks [48:46] and things like that. [48:50] In my submission to the county, [48:51] I've had viriance with that is [48:55] we do have opposition to the [48:55] height. [48:59] We do have opposition to the [49:00] setbacks. [49:01] And I trust that you all have [49:05] had a chance to read that [49:06] submission on the record. [49:07] However, I would like to speak [49:10] with, speak about the [49:12] comprehensive plan objective [49:17] 2.2, which sets the density, let [49:17] me pull that up. [49:22] That sets maximum density, and I [49:25] don't believe any dri or trip [49:29] conversion can allow excess [49:30] density nat [49:32] that the objective [49:32] withholds. [49:36] So for oc-20 it allows up to [49:37] about 189 units. [49:40] I don't believe the dri [49:41] conversions, the trip [49:42] conversions can now exceed [49:44] something that the objective [49:45] withholds. [49:46] So I do have an you should [49:48] issue with that. [49:51] And then I also have submitted [49:52] on record that I don't believe [49:55] it is in, it is consistent also [49:59] with policy 3.1 in the scale, [50:02] the mass, the bulk of structure, [50:04] pedestrian and vehicular traffic [50:06] and so for the record, I've put [50:09] 6 points down that I believe [50:13] support and corroborate that [50:16] with video evidence, with just [50:19] document evidence from the [50:20] traffic engineer and e and from [50:22] others and so -- how much time [50:24] do I have with eight people? [50:25] Two minutes? [50:27] >> yeah, if you divide it by [50:28] eight, there's roughly two [50:28] minutes a person. [50:30] >> a little under two. [50:32] I'm probably very close to that [50:33] so I will have to yield my time, [50:35] but I trust that you all have [50:41] read that document, and towards [50:42] the end there I'm asking you do [50:44] not grant variances on the [50:46] setback or the height. [50:51] Keep consistent with the plan. [50:53] These plans were put in place. [50:54] They're good plans just as you [50:56] were looking at the dri and trip [50:57] conversion, I believe the [50:58] comprehensive plan should take [50:59] precedent over all of that. [51:01] So I'm opposed to it. [51:02] >> all right, very good, thank [51:03] you, sir. [51:06] All right, next person woo who [51:08] wishes to speak in opposition? [51:09] >> laura? [51:12] >> that's me. [51:12] Hi. [51:14] My name is laura craig. [51:17] I live at 6348 cocoa lane in [51:19] apollo beach. [51:22] And I'm here to voice my concern [51:26] over these major modifications. [51:27] First and foremost you guys talk [51:29] about P.M. And A.M. Traffic. [51:31] Did anybody did these stud ation [51:32] actually live in apailo beach [51:35] and go down the A.M. And P.M. [51:37] Times that they did these [51:40] studies in? [51:44] The schools, the traffic is just [51:44] horrendous. [51:46] Apollo beach boulevard is two [51:48] lanes in, two lanes out. [51:50] You have one car that fits into [51:53] the turning lanes. [51:54] There has not been any [51:57] improvement to apollo beach [51:58] boulevard in many, many years. [51:58] There [52:03] there was a 2025 study, proposed [52:04] improvements, they were under [52:04] review. [52:06] one of those being taken one of [52:08] those lanes and putting it into [52:10] a golf cart and bicycle lane so [52:12] that cuts two lanes down to one. [52:19] You want to go and put 237 units [52:21] chroughly you figure two people [52:23] per unit minimum, roughly 500 [52:23] people. [52:25] Everybody has a car. [52:26] In and out. [52:34] There is just no, I didn't hear [52:35] anything to go and address the [52:36] infrastructure about this, and [52:37] not to mention the pick-up lines [52:42] that extend down going east on [52:43] apollo beach boulevard to the [52:44] school. [52:45] It extends all the way down [52:47] apollo beach boulevard, and all [52:49] the way down dickman boulevard. [52:51] It's or dickman road. [52:52] It's impossible. [52:53] I'm surprised that there hasn't [52:56] been a major accident as of yet [52:58] or any children being hurt or [53:02] killed by crossing these streets [53:05] because it's a 35-mile per an [53:07] hour zone, people use it for 50, [53:09] 60-mile depending on how fast [53:09] they want. [53:11] So that's my issue with traffic. [53:13] It's so close to 41 and apollo [53:14] beach boulevard intersection. [53:18] There's approximately 33 to [53:19] 35,000 vehicles that pass [53:24] through that intersection [53:25] already. [53:25] On the other side of 41. [53:26] They already built I don't know [53:31] how many hundreds of apartment [53:31] buildings. [53:33] Thaich already proposed another [53:39] 250 apartments on the south side [53:42] of paseo almar and 41. [53:45] And to go and voice evacuation. [53:47] We're in a flood zone. [53:50] We were flooded. [53:50] Two years ago. [53:51] The whole apollo beach [53:52] boulevard. [53:54] how do you plan on getting 30, [53:58] right now as -- it estimated [54:00] about 33,000 people live in [54:01] apollo beach. [54:03] How do you expect to get all of [54:05] these people out in case of an [54:05] emergency? [54:07] There is one way in and one way [54:07] out. [54:09] It's, there is, and there is no [54:11] evacuation plan in any re view. [54:14] There is nothing. [54:15] Nobody, when we sound the siren, [54:19] it's time to go. [54:21] You also have to go and contend [54:22] with the water shortage. [54:25] We're only allowed to go and [54:27] water our grass or plants or [54:29] whatever once a week and you're [54:30] only allowed 15 or 20 minutes [54:34] and now you plan on doing 237 [54:35] more people in a five-story [54:36] building which by the way does [54:37] not, is not compatible with [54:38] apollo beach. [54:40] You don't -- there is nothing [54:43] over two stories. [54:45] They are trying to get -- there [54:51] are two other complexes trying [54:53] to -- the waterset complex, the [54:55] one I mentioned, and we're not [54:57] mentioning the hotel, the [54:58] condominiums that they want to [54:59] do on surfside boulevard which [55:04] is another 50 to 55 condominiums [55:06] with retail. [55:07] They don't know retail or no [55:08] retail, they haven't decided [55:11] yet. [55:12] So between the water shortages, [55:13] the traffic issues, the road is [55:15] in horrible condition. [55:17] I mean, you have to weave and [55:21] dodge potholes, and sinkholes, [55:23] and then they come in and they [55:27] do a shoddy job patching it [55:28] anyway. [55:30] Ask r and this doesn't even [55:30] address the amount of people [55:32] that are going to be -- how many [55:33] kids are going to go going into [55:34] the schools. [55:37] I mean, they're already [55:38] overcrowded. [55:39] We have five schools right [55:41] around us and traffic is just [55:42] insane. [55:42] I don't leave my house until [55:43] after 10:00 in the morning [55:47] because you can't get through. [55:48] And then I make sure I'm home by [55:49] 2:00 because the traffic coming [55:53] home from school is crazy. [55:55] And then at 4:00 all the traffic [55:57] coming in from tampa, people [55:57] working. [56:02] The traffic has made this once [56:04] paradise into a nightmare. [56:05] You don't even want to leave [56:05] your house. [56:08] So I don't think that the, what [56:13] the developer or the, these [56:15] kuddies are show -- studies are [56:16] showing is the actual impact of [56:19] what you're try doing here. [56:21] You know, you're sounding like [56:22] yore all [56:24] you all live in tampa but how [56:25] about flooding? [56:26] You guys go and deal with [56:27] flooding. [56:28] The pipes over here, they're all [56:29] 50 years old plus, they're all [56:30] breaking. [56:31] My road already had three issues [56:34] with pipes bursting. [56:36] So it's just not, it's not [56:37] compatible. [56:40] Again, I'm not just like the [56:41] gentleman before me said, I'm [56:42] not against growth but I am [56:48] against this unbridled [56:48] development, and it's [56:51] unfortunate that we live in an [56:52] unincorporated hillsborough [56:53] county because we don't have a [56:53] voice. [56:55] We are the voice. [56:55] And it seems like we're not [56:58] being listened to. [56:58] you [57:01] you know, we moved here for a [57:04] reason, and that reason is being [57:06] eroded so quickly that it makes [57:07] your head spin. [57:08] You know, they have waterset [57:09] that's already gone all the way [57:12] down through 19th street. [57:14] There is no more rural land. [57:14] There is none. [57:16] What used to be tomato farms and [57:16] cattle farms is nothing. [57:20] It's just houses and houses and [57:20] houses. [57:29] So yes, I am, there are high [57:30] density projects with everything [57:31] around and now they approved [57:33] costco and target across the [57:35] street from the high school on [57:35] big bend. [57:37] It's going to be even more of a [57:37] nightmare. [57:40] I mean to get up it used to take [57:41] me 15 minutes to get up to 75. [57:43] I'm lucky if I could get up [57:45] there in 35 minutes. [57:46] Do the [57:50] to the highway and then get on [57:54] 75 to get up to brandon. [57:59] It's a 10-mile trip, 45 minutes. [57:59] So. [58:00] >> ma'am, let's -- there are a [58:01] few more people that want to [58:02] speak. [58:02] >> I know, I'm sorry. [58:03] I'm done. [58:04] I'm done, yes, I just hone that [58:06] these developers give, there's [58:09] no thought to the quality of [58:13] life, and I respectfully ask for [58:14] this major modification to be [58:14] denied. [58:15] Thank you. [58:15] >> all right. [58:16] Thank yo, ma'am. [58:18] Okay, next person that wishes to [58:22] speak in opposition. [58:23] >> lynne banks. [58:24] >> hello, can you hear me? [58:26] >> yes, hi, my name is [58:28] lynnebanks and I live at 102 st. George court. [58:31] Back in APRIL I put together a [58:33] petition as a member of the over [58:36] 500 unit caribbean isles [58:38] waterfront mobile home community [58:38] co-op. [58:40] I want to express our [58:42] significant concern and oppose [58:44] the construction of this huge [58:44] apartment building and the [58:47] reasons are as follows. [58:48] Number 1 I want to completely [58:53] support the documentation [58:56] ubmitted by brad ahlgren his [58:57] analysis of the entire process [59:00] is absolutelyright [59:01] absolutelyright on. [59:04] Number two, the problem at [59:06] caribbean ieltz rr is water [59:08] runoff and our canals are [59:09] filling up with silt and other [59:11] items causing our canals to be [59:12] overrun with silt and filling [59:13] in. [59:13] Our community spent almost a [59:14] million dollars in the las [59:17] couple of years dredging the [59:20] community that has been touted [59:21] as a waterfront boating [59:22] community. [59:23] Many people can [59:25] cannot even get [59:27] their boats off the lifts let [59:29] alone navigate to tampa bay to [59:30] enjoy the wonderful environment [59:31] we have. [59:32] Number one concern would be to [59:32] ask the developer if he is [59:34] willing to put up a million [59:36] dollar surety bond to address [59:37] all damages and issues that MAY [59:39] affect the caribbean isles [59:41] mobile home community and the [59:42] future if this plan should go [59:46] through. [59:47] I think this is certainly [59:47] reasonable. [59:48] If there is no damage, there is [59:48] no cost. [59:49] If there is damage we would like [59:50] to be compensated for the [59:51] ability to use our canals that [59:54] we purchased over the last 40 to [59:58] 50 years. [1:00:00] Secondly as a retired law [1:00:01] enforcement officer having [1:00:03] watched everything going up and [1:00:04] down apollo beach boulevard, I [1:00:05] am appalled that the traffic [1:00:07] study was number one, [1:00:08] inaccurate, and number two, it [1:00:12] hasn't been significantly and [1:00:13] adequately documented or [1:00:16] finalized as to the amount of [1:00:19] traffic problems that could be [1:00:21] if this apartment building goes [1:00:21] through. [1:00:22] There is no ability to put in [1:00:23] left turn lanes, right turn [1:00:25] lanes, there is no ability for [1:00:26] traffic to get across apollo [1:00:27] beach boulevard to go north and [1:00:29] south, and what the developer is [1:00:31] proposing is absolutely [1:00:35] ridiculous from a staff [1:00:35] perspective. [1:00:37] You can't ask trucks, fire [1:00:37] department engines, or [1:00:38] ambulances or anything else to [1:00:41] make u-turns at the south end of [1:00:42] the north end of this building [1:00:43] so that's not going to work for [1:00:44] them. [1:00:46] Plus we also had a golf cart [1:00:50] fatality at the road apollo [1:00:52] beach -- where curib crn [1:00:54] caribbean isles [1:00:55] gets off apollo beach biewbd [1:00:56] tat was never documented, that [1:01:00] was in DECEMBER of 2024. [1:01:01] So I think the traffic study [1:01:01] needs to be done. [1:01:03] I also think that we are in [1:01:06] agreement that a final traffic [1:01:07] study from hillsborough county [1:01:09] as to what the plan is for [1:01:11] apollo beach boulevard from the [1:01:11] - [1:01:13] bay all the way to highway 41. [1:01:15] It's absolutely ooze i [1:01:18] -- as I can [1:01:19] only imagine as everybody agrees [1:01:20] is a nightmare. [1:01:24] Nobody would want to drive on [1:01:24] that. [1:01:25] Thirdly the height is not cub [1:01:30] forming to the 50-foot [1:01:31] guidelines. [1:01:32] A 65-foot building I will be [1:01:35] able to change the televisions [1:01:37] with my remote control to the [1:01:39] people that live on the third, [1:01:40] fourth, and fifth building if [1:01:41] this should go through. [1:01:42] What irritates us to no end is [1:01:44] that because the zoning [1:01:46] purpose -- notification purposes [1:01:49] are only 350 feet, you MISS [1:01:51] Notifying caribbean isles [1:01:52] community by about 125 feet. [1:01:55] Which we consider completely [1:01:56] unfair and actually kind of [1:01:57] disappointing because it sounds [1:01:59] like the developer was trying to [1:02:02] hide from us. [1:02:03] So the heighth is awful. [1:02:05] There are no other four or [1:02:06] five-story buildings west o [1:02:08] highway 41, and what's going on [1:02:10] east of highway 41 is already at [1:02:14] a 40% or more vacancy. [1:02:16] They are not filling these [1:02:16] buildings up. [1:02:19] Nobody can afford them. [1:02:20] Lastly, as was pointed out in [1:02:26] the documentation from [1:02:27] MR. Ahlgren, the sewer and water [1:02:28] issues going to be a huge [1:02:28] concern. [1:02:30] The wastewater is not able to be [1:02:31] handled right now with what is [1:02:32] in place. [1:02:33] You start building more of these [1:02:34] buildings without having a plan [1:02:37] in place, who's going to pay for [1:02:37] that? [1:02:39] That's going to have to come out [1:02:41] of taxes someplace. [1:02:42] There is absolutely no way [1:02:43] you're going to put in a new [1:02:44] water treatment plant without [1:02:46] costing everybody in appallee [1:02:47] beach [1:02:50] appalleeobeach an exorbitant amount of [1:02:50] money. [1:02:53] So with that said I'm going to [1:02:55] defer my time to anybody else [1:02:55] that wants to speak. [1:02:57] Just remember we have over 500 [1:02:59] people in our community, and 350 [1:03:01] of them signed a petition [1:03:03] against and opposing this [1:03:03] development. [1:03:05] Please stick to the rules and [1:03:06] the regulations that have been [1:03:08] written and that have been [1:03:08] planned. [1:03:10] Major modifications don't need [1:03:11] to be addressed right now. [1:03:13] I think that's just totally [1:03:14] unheard of. [1:03:15] Thank you for your time. [1:03:16] >> okay, thank you, ma'am. [1:03:18] All right, about out of 15 [1:03:18] minutes. [1:03:19] How many more people wish to [1:03:23] speak in opposition? [1:03:25] I see one, two, people. [1:03:28] Three? [1:03:29] Okay. [1:03:31] I'm going to grant -- [1:03:33] >> there are people in the [1:03:33] audience as well. [1:03:34] >> and there are people in the [1:03:35] audience. [1:03:35] Raise your hands. [1:03:36] I got two people if [1:03:38] in the audience [1:03:39] as well, so that's five. [1:03:44] Grant five more minutes. [1:03:46] That please keep that in mind. [1:03:48] That's a minute per person [1:03:52] unless you have a designated [1:03:53] speaker. [1:03:56] Next speaker, please. [1:03:57] >> mary lavry. [1:03:59] >> 123 st. Martins way in [1:04:01] appallee beach, and I'm speaking [1:04:05] then in opposition to this. [1:04:07] My concerns are with the [1:04:09] existing traffic and the [1:04:11] intensity as lynne banks had [1:04:13] stated that there was a death [1:04:17] from our community tat was not [1:04:18] documented in the -- that was [1:04:18] not documented in the traffic [1:04:19] study. [1:04:23] I also want to talk about the [1:04:24] 237 unit dri. [1:04:27] Thank you for acknowledging that [1:04:29] there are still questions with [1:04:30] that exchange because it did not [1:04:36] make sense to me. [1:04:37] , 435,000 square feet being [1:04:42] changed into 310,000 square feet [1:04:44] so that was a shortage of [1:04:45] 275,000 square feet. [1:04:47] It did not make sense the math [1:04:51] did nt make sense to me. [1:04:55] Speaking about the height and [1:04:55] compatibility. [1:04:57] We in apollo beach really only [1:04:59] have two-story buildings so [1:05:03] having this now go to four story [1:05:04] buildings, [1:05:05] , that's definitely not [1:05:06] compatible. [1:05:10] We probably need to have ayes on eyes on [1:05:11] whether than paperwork submitted [1:05:13] to say yes, it's curppatible. [1:05:14] There is also concern for [1:05:16] drainage and the environmental. [1:05:20] As lynne also spoke about, we [1:05:22] are in a canal community, and [1:05:25] those canals are significantly [1:05:28] impacting our way of life, and [1:05:33] there is also then concern about [1:05:36] the coastal evacuation that has [1:05:39] not been addressed soy where, so I would [1:05:41] request the board that the [1:05:43] transportation access changes [1:05:50] have not really been resolved. [1:05:53] The 237 unit dri entitlement [1:05:56] exchange remains deficient. [1:05:58] The transportation staff [1:05:59] concerns are -- continues to [1:06:00] object. [1:06:02] And there is specific questions [1:06:04] regarding the intensity, the [1:06:11] drainage and community, [1:06:12] cumulative impacts. [1:06:13] Transportation impacts have not [1:06:16] been answered fully and for [1:06:17] these reasons I respectfully ask [1:06:18] the board not to approve. [1:06:19] >> okay, thank you, ma'am. [1:06:26] Next person, please. [1:06:27] >> michelle read. [1:06:27] Thank [1:06:31] reed, thank you verymuch. [1:06:32] Can you hear me. [1:06:32] >> yes. [1:06:33] >> the traffic is a problem. [1:06:34] I come out [1:06:35] out of our small [1:06:36] community on gulf and sea and [1:06:38] there are no adequate turnoffs [1:06:38] anywhere. [1:06:39] It is very dangerous to cross [1:06:43] from the south side of apollo [1:06:43] beach boulevard to the north [1:06:45] side in any u-turn fashion and [1:06:46] vice versa. [1:06:48] It is just extremely dangerous [1:06:49] and you just wait and wait and [1:06:50] wait. [1:06:51] I would like to give the rest of [1:06:59] my time to MR. Ahlgren to speak [1:07:00] to the six points. [1:07:02] >> can you please give your [1:07:03] address. [1:07:05] >> 423 island cay way, apollo [1:07:06] beach. [1:07:14] >> okay, next person, please. [1:07:16] >> mauro vitone and I believe [1:07:17] besides him we had two more [1:07:21] people signed up online. [1:07:25] >> hi, mario vittone. [1:07:26] We're the lght industrial [1:07:28] building to the north of the [1:07:29] property, and with nine acres. [1:07:31] I need 30 seconds. [1:07:35] Our concern is just the impact. [1:07:38] All we want to do with our land [1:07:41] is develop it as the pd says to [1:07:44] develop it, just with more, we [1:07:48] want to put about 20 more light [1:07:49] units for the people of apollo [1:07:51] beach to work in apollo beach. [1:07:53] We're just looking to put up [1:07:54] some places that small [1:07:56] businesses can open up there. [1:07:59] So our concern is that we'll -- [1:08:02] if this development will impact [1:08:03] the amount of square footage we [1:08:04] have left when it comes time for [1:08:05] us to develop our land. [1:08:06] That's it. [1:08:07] And so it's not really -- I'm [1:08:11] not for or against the property. [1:08:12] Mostly because we moved out of [1:08:13] apollo beach because of traffic, [1:08:15] so we escaped it but it sounds [1:08:17] like a valid complaint but for [1:08:18] us, my concern is just what it [1:08:21] does to the, ours, chis the last [1:08:23] remaining land to be developed. [1:08:24] R in [1:08:25] in the zone. [1:08:26] Thanks very much. [1:08:26] >> thank you, sir. [1:08:30] All right, next person, please. [1:08:35] >> rick french. [1:08:46] Rick, are you there? [1:08:50] >> rick, are you there? [1:08:50] >> hello? [1:08:53] Hello? [1:08:53] >> hello, rick. [1:08:54] >> well, if you don't mind, I'm [1:08:55] going to put him on hold, there [1:08:57] are a couple of people in the [1:08:58] audience that raised their hand. [1:08:59] I wanted [1:09:02] that wanted to speak in [1:09:02] opposition. [1:09:03] If you could please come [1:09:07] forward. [1:09:08] Good evening. [1:09:08] >> good evening. [1:09:09] Thank you. [1:09:10] My name is robert dauby. [1:09:14] I live at 1407 jupawno loop, [1:09:14] apollo beach. [1:09:17] I moved to florida. [1:09:19] It'll be five years in JANUARY [1:09:21] because california turned into a [1:09:23] ses pit of certain things. [1:09:28] In areas of crime and the [1:09:29] whatnot hoping florida was a [1:09:30] little different than it is. [1:09:34] it's a terrific state except [1:09:36] this, I am all for live local [1:09:39] thing nat is nice but the [1:09:40] section 8 housing and there are [1:09:42] a lot of vouchers in california [1:09:45] and those crime rates do ego up [1:09:46] and has not been addressed yet. [1:09:48] Crime rates go up in those areas [1:09:49] unless there is a real good [1:09:51] screening of people that come [1:09:51] in. [1:09:52] I have experienced, I have a [1:09:52] 7-year-old. [1:09:57] The traffic is, is out -- it's [1:09:58] crazy. [1:09:59] I've seen it increase since I [1:10:01] first got here five years ago. [1:10:02] It's just increased and as they [1:10:04] said there are the costcos, [1:10:06] there's this, the wal-mart, [1:10:07] they're building up like crazy. [1:10:08] There are homes all over the [1:10:09] place, and there is, you know to [1:10:11] put this here in apollo beach, [1:10:11] it'll [1:10:13] it'll hurt land values and if [1:10:15] that happens, I think then [1:10:16] developers that are putting this [1:10:19] kind of thing in should be held [1:10:20] responsible. [1:10:20] >> okay. [1:10:20] Thank you. [1:10:21] >> all right. [1:10:21] >> thank you, sir. [1:10:24] All right, one last speaker. [1:10:26] Sir, can I get you to sign in? [1:10:27] >> oh, sorry. [1:10:31] >> get the last speaker here. [1:10:32] Because time's up. [1:10:35] >> I live at 6510 dolphin cove [1:10:36] drive. [1:10:37] There are a lot of reasons to [1:10:39] not approve this, major [1:10:40] modification, I think we heard [1:10:41] them here this evening, there is [1:10:44] a lot of stuff with the traffic [1:10:46] counts that you know like I hope [1:10:47] everybody realizes the inbound [1:10:48] and outbound traffic is based [1:10:50] probably on the 237 units but [1:10:51] there is also a low income [1:10:52] apartment building that was [1:10:54] already approved that no one [1:10:55] could stop right beside this [1:10:57] current one that's up for [1:10:58] approval. [1:10:58] In addition to that, we [1:11:00] obviously heard that the [1:11:01] traffic's awful but that traffic [1:11:03] signal right there at 41 and [1:11:05] boulevard to substandard, it [1:11:07] cannot handle the traffic that [1:11:08] goes there currently. [1:11:09] It was originally designed for a [1:11:11] t intersection now it's a [1:11:12] four-way. [1:11:12] It was also the county is [1:11:14] getting ready to approve [1:11:15] administrative variance for [1:11:17] median spacing, the boulevard is [1:11:19] substandard as it is. [1:11:20] So I don't know why we would go [1:11:21] approve a variance. [1:11:22] In addition the county is also [1:11:23] going to approve a design [1:11:26] exception but the rode is -- [1:11:27] road is substandardo even if you [1:11:28] acquire more right-of-way or get [1:11:29] more right-of-way to put a [1:11:31] shared use path in there, it's [1:11:32] still, there are no other shared [1:11:34] use paths there so why are we [1:11:34] jumping through hoops to approve [1:11:35] somebody that -- approve [1:11:39] something that nobody wants. [1:11:40] >> okay, I'm done. [1:11:40] >> thank you, sir. [1:11:44] All right, with that, [1:11:45] development services staff, [1:11:49] anything further? [1:11:51] >> nothing further. [1:11:52] Nope, transportation is saying [1:11:57] no as well. [1:12:02] >> applicant has opportunity for [1:12:03] rebuttal. [1:12:04] >> evening hearing mast, lots to [1:12:05] cover in five minutes. [1:12:07] Don't want to be late with [1:12:09] homework so MR. Henry is going [1:12:10] to talk about the assignment you [1:12:19] gave him, and then I'll be back. [1:12:21] >> we looked at the P.M. Peak [1:12:24] hour, and so as MR. Ratliff [1:12:26] ratliff had [1:12:27] indicated we were looking at [1:12:30] inbound and outbound so in this [1:12:31] case the A.M. Peak hour, the [1:12:33] apartments on top which match [1:12:36] MR. Ratliff's table, is 57 cars. [1:12:39] So that's the inbound for the [1:12:40] apartments. [1:12:43] So we compare that to the retail [1:12:46] trips and for 36,000 square [1:12:49] feet, it's about 57 trips [1:12:51] inbound in the P.M. And about 60 [1:12:52] outbound. [1:12:54] So that's how you get that [1:12:55] equivalency based on the actual [1:12:56] trip generation. [1:12:57] So now again, when you look at [1:12:59] A.M., that's where the [1:13:00] difference is because of the [1:13:01] trip generation and A.M. [1:13:03] But this gives you what that is [1:13:04] for the P.M. Which we believe is [1:13:05] the appropriate -- [1:13:07] >> as far as you know, [1:13:09] development services, [1:13:13] transportation staff, do not, [1:13:14] they are going to argue with you [1:13:16] about the P.M. Peam [1:13:17] peak hour. [1:13:19] >> it's they are going to agree [1:13:21] with the numbers, it's a [1:13:24] question of whether you do A.M. [1:13:24] Or P.M.? [1:13:26] >> you agree on the numbers? [1:13:28] >> on trip generation, when he [1:13:30] did his table, he did worst [1:13:32] case, which was the outbound in [1:13:33] the A.M. [1:13:35] >> all right, so I got it. [1:13:44] >> thank you. [1:13:46] >> close briefly, in 1979 the [1:13:47] county commission adopt [1:13:47] addevelopment plan for this [1:13:49] area, and that [1:13:52] preceded a lott of the [1:13:53] externalities of growth you [1:13:54] heard about. [1:13:57] you hear about it every time [1:13:58] you're on this side of the [1:13:59] podium. [1:14:02] -- how much growth we've had. [1:14:04] And some other infrastructure [1:14:05] shortages we have had. [1:14:07] This is popular to note but it's [1:14:07] through developments of any kind [1:14:09] that new rev nigh comes into the [1:14:10] county, and it's the new [1:14:11] buildings that fill the [1:14:12] potholes. [1:14:14] That's just math, that's how it [1:14:15] is. [1:14:16] The comprehensive plan, one of [1:14:17] the folks in opposition, [1:14:19] mentioned that the comprehensive [1:14:21] plan imposes some type of [1:14:22] ceiling on the density that [1:14:23] we're piercing. [1:14:25] This is a vested development [1:14:27] order that goes back to 1979. [1:14:29] And the trips and the uses that [1:14:31] are attended to that are vested [1:14:32] rights that run with the [1:14:32] property. [1:14:33] And again, what we're really [1:14:38] talking about is how those r are [1:14:38] exchanged. [1:14:39] We believe to be true to the [1:14:41] text it aligns with our [1:14:43] interpretation and our proposed [1:14:45] conversion that that is the most [1:14:46] legally defensible, strict [1:14:48] reading of the way the text as [1:14:51] it is and as it's been since [1:14:52] 1979 and appreciate your [1:14:52] patience tonight. [1:14:54] I have nothing further. [1:14:54] Thanks. [1:14:55] >> thank you, sir. [1:14:56] Okay. [1:14:57] With that, that concludes this [1:14:58] application. [1:14:59] MS. Heinrich, we're ready for [1:15:01] the next case. [1:15:02] >> our next application is item [1:15:06] d.2, pd 26-0363. [1:15:08] The applicant is requesting to [1:15:11] rezone property from pd 1373 to [1:15:12] planned development. [1:15:16] I've viewed this for development [1:15:17] services and will provide staff [1:15:18] findings after the applicant's [1:15:19] presentation. [1:15:31] >>> okay, the applicant, please. [1:15:32] >> good evening, hearing [1:15:34] officer, staff members, todd [1:15:36] pressman, 200 second avenue [1:15:38] south, number 451 in [1:15:39] st. Petersburg. [1:15:43] This r intrrks pd 26-0363. [1:15:47] Planning commission finds [1:15:48] consistent, development services [1:15:49] supports. [1:15:50] There are no agency objections. [1:15:51] We are located in the seffner [1:15:53] mango area, 4.11 acres. [1:15:54] You can see that we're close to [1:15:57] I-75 and mlk, JR. Boulevard. [1:16:01] We're located on lakewood drive [1:16:05] abutting south end jim john lane [1:16:06] as shown by the property [1:16:06] appraiser. [1:16:08] So the issue is the pd for 14 [1:16:10] single-family homes. [1:16:11] It was previously approved for [1:16:15] four to six single-family homes. [1:16:17] This is the proposed pd again [1:16:19] for 14 single-family homes. [1:16:20] It is being removed out of a [1:16:25] much larger pd, a companion prs [1:16:28] is filed. [1:16:31] And the existing pd is primarily [1:16:33] mobile home community. [1:16:35] This is being removed for the [1:16:38] single-family as indicated. [1:16:43] And that larger pd is a 425 unit [1:16:45] mobile home community. [1:16:46] Zoning is really sort of a mix [1:16:49] on the residential side. [1:16:52] You see rsc-6, you see as-1, a [1:16:55] lot of PDs, it is a variable [1:16:59] residential area but primarily [1:17:01] almost exclusively residential. [1:17:03] This is just to show you an [1:17:04] aerial to the side you can see [1:17:05] the scrairious [1:17:07] various types of residential [1:17:10] from mobile homes to [1:17:11] single-family. [1:17:12] Planning commission does note [1:17:13] we're compatible. [1:17:14] Could be consider for [1:17:16] considered for up to [1:17:18] three to six dwelling units and [1:17:20] they note the intent supports [1:17:21] goal 2 of the seffner mango [1:17:22] community plan. [1:17:23] Development services note while [1:17:26] it's located residential area [1:17:26] featuring single-family detached [1:17:28] mobile home park uses, [1:17:29] single-family residential, [1:17:32] again, a nice mix of different [1:17:33] various types. [1:17:35] The proposed density is one of [1:17:37] the maximum in the rs9 future [1:17:42] land use category. [1:17:43] Hearing officer, I will tell you [1:17:45] we sent out 26 notices two [1:17:46] times. [1:17:49] There are two letters in the [1:17:49] file. [1:17:53] One has to do with referring to [1:17:54] clear road improvements or [1:17:55] traffic study would make safety, [1:17:57] and would make safety and [1:17:59] congestion worse. [1:18:00] The county transportation [1:18:04] department does indicate no [1:18:04] objections. [1:18:06] And our transportation expert is [1:18:07] here. [1:18:11] The other letter has to do with [1:18:12] no infrastructure being [1:18:13] considered when of course [1:18:16] infrastructure is considered for [1:18:17] the location. [1:18:21] And concerned about lakewood [1:18:23] only having two lanes and there [1:18:26] are trees that should not be cut [1:18:27] down, but of course as a [1:18:28] standard, that's not an issue at [1:18:30] the moment, and that's an issue [1:18:32] of course that would have to go [1:18:32] through quite a few departments [1:18:33] and approvals as it would come [1:18:35] in for site plan. [1:18:38] So with that, if you have any [1:18:39] questions or concerns, I'd be [1:18:46] happy to answer them. [1:18:48] Jason, jason, are you here? [1:18:49] Do you want to make any comments [1:18:52] if you feel necessary? [1:18:55] If you would allow. [1:18:55] >> sure. [1:18:57] >> good evening: thank you. [1:19:00] My name is jason rinard. [1:19:01] I'm 3242 henderson boulevard, [1:19:02] tampa, florida. [1:19:04] I'm a landscape architect with [1:19:05] the group that's looked at this [1:19:07] from the civil and [1:19:08] transportation components. [1:19:11] We just wanted to kind of [1:19:12] reiterate what todd just talked [1:19:12] about. [1:19:14] We are going to have to [1:19:16] obviously moving forward if this [1:19:18] is approved we will move forward [1:19:19] working with, you know, [1:19:20] requirements of land development [1:19:22] code in terms of the trees. [1:19:23] We understand we would certainly [1:19:25] have to do an arborist report to [1:19:27] determine if there are grand [1:19:28] trees along lakewood drive and [1:19:29] certainly any impacts we would [1:19:31] have to address as part of that [1:19:32] process. [1:19:33] So we [1:19:35] we fully support we would [1:19:36] have to meet that criteria. [1:19:37] >> okay, very good. [1:19:38] Thank you, sir. [1:19:41] Please sign in. [1:19:41] Okay. [1:19:44] All right, MR. Pressman, that [1:19:46] conclude your presentation? [1:19:47] >> yes, sir, thank you. [1:19:49] >> all right, thank you. [1:19:49] All right. [1:19:51] Development services staff. [1:19:52] >> michelle heinrich, [1:19:54] development services. [1:19:57] Staff reviewed a 4.11-acre [1:19:58] parcel located on the west side [1:20:00] of lakewood drive south of clay [1:20:01] pit road. [1:20:02] the subject site is located [1:20:05] within the res 9 future land use [1:20:06] category and within the urban [1:20:09] service area. [1:20:11] The subject parcel is parcel b [1:20:14] within pd 18-1373. [1:20:16] And parcel a as you heard from [1:20:17] applicant, the remainder part of [1:20:21] this pd, is approved for a 425 [1:20:25] space mobile home park. [1:20:26] Parcel b alone is permitted for [1:20:28] four single-family lots, which [1:20:31] can be subdivided or left on one [1:20:32] parcel. [1:20:34] To recognize the removal of this [1:20:38] parcel from pd 18-1373, the [1:20:41] applicant has filed a companion [1:20:42] prs application. [1:20:43] The site is located within area [1:20:45] developed with single-family [1:20:47] detached residential, and mobile [1:20:48] home park uses, all within the [1:20:52] res 9 future land use category. [1:20:54] The applicant's request is for [1:20:55] 14 single-family lots resulting [1:20:57] in a density of 3.4 units per [1:20:58] acre. [1:20:59] Proposed development standards [1:21:01] are comparable to the rsc-9 [1:21:02] standard zoning district. [1:21:03] Staff received no objections [1:21:05] from reviewing agencies, and [1:21:07] finds the request supportable [1:21:08] subject to proposed conditions [1:21:11] of approval. [1:21:14] >> just for the record, how big [1:21:19] was the parent pd that this is [1:21:23] being sort of taken away from? [1:21:25] >> for that one idon't know how [1:21:29] large the original pd is. [1:21:32] It is just visually when I've [1:21:33] looked at that site plan it is [1:21:35] quite large, takes up almost a [1:21:36] city block. [1:21:38] >> yeah. [1:21:43] And it's has approval for 400 [1:21:45] and something mobile home park [1:21:45] spaces. [1:21:46] >> mm-hmm. [1:21:47] >> is density calculated the [1:21:53] same way for mobile home park [1:21:54] spaces? [1:21:54] >> it is. [1:21:57] >> so there is no issue with [1:22:01] this track contributing to thick the [1:22:03] acreage needed to maintain the [1:22:07] 425 face mobile home park? [1:22:08] >> no. [1:22:08] In [1:22:09] . [1:22:10] >> okay, so thootsler [1:22:12] that's not an issue. [1:22:13] >> correct, not an issue. [1:22:14] >> all right, planning [1:22:15] commission staff. [1:22:16] >> lilyann linehan, planning [1:22:17] commission staff. [1:22:18] Subject property is within the [1:22:19] residential 9 future land use [1:22:20] category, and in the urban [1:22:21] service area, and within the [1:22:22] limits of the seffner mango [1:22:25] community plan. [1:22:26] Objective 1.1 of future land use [1:22:27] section directs 80% of the [1:22:29] county's anticipated growth into [1:22:31] the urban service area, flu's [1:22:33] policy 3.1.3 requires that new [1:22:34] development be compatible with [1:22:35] the surrounding uses, and [1:22:36] recognizes that compatibility [1:22:38] does not mean the same as but [1:22:39] refers to the sensitivity of the [1:22:40] development proposals and [1:22:41] preserving the character of [1:22:43] existing development. [1:22:45] And additionally objective 4.4 [1:22:48] and policy 4.4.1 require new [1:22:49] development to be compatible [1:22:50] with the surrounding [1:22:51] neighborhood. [1:22:52] In this case, single-family two [1:22:54] two-family and multifamily uses [1:22:56] are present in the immediate [1:22:56] vicinity of the site and the [1:22:57] existing land use pattern [1:22:59] establishes a predominantly [1:23:00] residential context that [1:23:01] supports the proposed [1:23:02] development. [1:23:03] the intent of the residential 9 [1:23:05] category is to recognize low to [1:23:08] medium density residential uses [1:23:09] and residential 9 future land [1:23:10] use surrounds the subject site [1:23:13] to the north, south, and east, [1:23:14] while residential 12 and urban [1:23:16] mixed use 20 is to the west. [1:23:18] The request is to allow 14 units [1:23:19] and is consistent with the uses [1:23:21] allowed under the residential 9 [1:23:22] future land use category, and [1:23:25] therefore, is consistent with [1:23:26] future land use section goal 2 [1:23:28] and objective 2.1. [1:23:29] Additionally the request [1:23:31] supports the intent of goal 2 of [1:23:32] the seffner mango community plan [1:23:34] and its associated strategies, [1:23:36] by providing additional housing [1:23:37] opportunities while maintaining [1:23:39] compatibility with the character [1:23:40] and development pattern of the [1:23:41] surrounding area. [1:23:43] Based upon the above [1:23:44] considerations and the following [1:23:46] goals, objectives, and policies, [1:23:47] planning commission staff finds [1:23:48] the proposed planned development [1:23:49] consistent with the [1:23:50] unincorporated hillsborough [1:23:52] county comprehensive plan [1:23:53] subject to the conditions [1:23:54] proposed by the hillsborough [1:23:55] county development services [1:23:56] department. [1:23:56] >> okay. [1:23:58] Thank you. [1:24:00] At this point in time, is there [1:24:02] anyone in the audience that [1:24:03] wishes to speak in support of [1:24:04] the application? [1:24:06] No one responding, anyone in the [1:24:08] audience wish to speak in [1:24:12] opposition to the application? [1:24:14] Seeing no one responding, staff, [1:24:16] anything further? [1:24:18] >> no, sir. [1:24:19] >> applicant, opportunity for [1:24:19] rebuttal. [1:24:20] >> we're good, thank you. [1:24:21] >> very good. [1:24:22] All right, with that, that [1:24:25] concludes this application. [1:24:25] MS. Heinrich, we're ready for [1:24:26] the next case. [1:24:31] >> our next item is item d.3, pd [1:24:31] 26-0445. [1:24:33] The applicant is requesting to [1:24:35] rezone property from cg to [1:24:37] planned development. [1:24:40] Tangia chapela with development [1:24:43] services has reviewed this and [1:24:44] will present staff's findings [1:24:47] after applicant's presentation. [1:24:48] >> applicant, penalize. [1:24:53] >> good evening hearing officer. [1:24:56] -- this is pd 26-0445. [1:24:57] Planning commission finds [1:24:59] consistent, meets the locational [1:25:00] criteria. [1:25:05] It reduces the average trips by [1:25:08] 3,438, reduces the A.M. Peaks [1:25:11] tremendously, 256, 234 [1:25:13] respectively, no objections by [1:25:14] seven agencies. [1:25:15] We are in the general town 'n' [1:25:19] country area,.55 acres. [1:25:24] The issue is cg to pd to [1:25:26] specifically allow 11,979 square [1:25:27] feet of professional services, [1:25:30] health practitioners, officer, [1:25:33] medccialtion dental, laboratory, [1:25:35] medical offices, clinical with [1:25:37] emergency services scheduled by [1:25:38] physicians. [1:25:40] The floor would be open area for [1:25:41] permitted uses so we're located [1:25:42] on west waters avenue as you can [1:25:44] see here. [1:25:46] Per property appraiser. [1:25:48] Surrounding uses are shopping [1:25:49] center across the street, [1:25:51] shopping center to the west, [1:25:53] apartments, which are located to [1:25:56] the east and to the south. [1:25:58] This is a close aerial that you [1:25:59] can see in regard to the [1:26:00] apartments and the shopping [1:26:01] center next door. [1:26:07] the site is currently vacant. [1:26:09] Waters avenue carries [1:26:10] approximately 47,500 vehicles [1:26:12] per day, very intensive arterial [1:26:13] roadway. [1:26:16] So again the issue is for more [1:26:19] or less business professional [1:26:21] offices, which is a down zoning [1:26:22] from the commercial general that [1:26:27] it is now, and that is the main [1:26:28] direction, the main issue here [1:26:30] is a significant down zoning of [1:26:31] the uses. [1:26:35] So looking at the pd plan on [1:26:37] waters avenue, I've outlined the [1:26:39] building footprint as proposed. [1:26:46] We're showing a 15-foot building [1:26:47] setback -- on the east to the [1:26:49] rear of the apartments are [1:26:52] significantly further back, [1:26:55] 75 feet, going back to the [1:26:56] aerial as you can see there's a [1:27:01] lot of separation to the south. [1:27:03] >> okay if you could just to [1:27:06] clarify for me the building [1:27:08] footprint is sort of a darker [1:27:10] solid black line? [1:27:10] >> yes. [1:27:13] >> and that building location is [1:27:15] closest to waters avenue? [1:27:17] >> yes. [1:27:17] >> okay. [1:27:19] And if you don't mind, regarding [1:27:24] the just to clarify, the office [1:27:25] space, is there parking below [1:27:26] the building? [1:27:29] >> parking would be below, yes, [1:27:30] below the building and some [1:27:32] would be to the rear. [1:27:34] As you note there is a note on [1:27:36] the conceptual plan for the [1:27:36] parking. [1:27:37] >> so there is parking below and [1:27:39] there are two floors of office [1:27:39] space? [1:27:40] >> three floors -- well, [1:27:41] proposed three floors of office [1:27:43] space, and then a fourth which [1:27:45] is really an open. [1:27:47] >> okay so three floors of [1:27:49] office space and that fourth [1:27:51] floor is gathering spot of some [1:27:51] kind. [1:27:52] >> is it what? [1:27:53] >> gathering spot. [1:27:53] >> yep. [1:27:54] >> of some kind. [1:27:57] >> yep. [1:27:57] >> okay. [1:27:58] >> okay and so the height [1:28:00] proposed is 48 feet. [1:28:03] So does that work? [1:28:07] >> we know it's a tight site, [1:28:08] and we know asb [1:28:10] as weave [1:28:11] we've gone [1:28:12] through the process there have [1:28:14] been a lot of issues to go [1:28:15] through and we know there is [1:28:16] going to be some nipping and [1:28:17] tucking. [1:28:18] Putting some paper [1:28:21] pencil to paper for [1:28:23] site planning it is going to be [1:28:24] tight. [1:28:25] Whether that's all going to be [1:28:27] able to fit into a site, we're [1:28:28] going to see. [1:28:31] >> okay, got it. [1:28:31] >> continue? [1:28:32] >> go on, yes. [1:28:34] >> so zoning as I've indicated [1:28:36] is kcg. [1:28:40] Cg and cn is predominant. [1:28:43] Rn16 for multifamily is for the [1:28:44] east and for the south. [1:28:46] That corridor is an intensive [1:28:48] corridor with CGs and CNs [1:28:50] along waters avenue. [1:28:51] Future land use is, 12 [1:28:54] r12 which [1:28:57] allows commercial uses -- p is [1:29:00] down zoning. [1:29:01] Development service note -- [1:29:03] permitted in the cg zoning [1:29:05] category. [1:29:08] Cg allows car wash, 24 hour [1:29:10] major minor autoo repair, [1:29:11] recyclable materiality recover [1:29:12] deargs material recovery, [1:29:14] 24-hour shopping centers, [1:29:15] restaurants to eating [1:29:19] establishments not drive-thru, [1:29:20] banks and receptions. [1:29:22] We have a list of [1:29:23] restrictions -- actually most of [1:29:24] these were brought forward by [1:29:25] the staff which we were [1:29:29] accepting of them about the [1:29:31] fourth floor being recessed [1:29:34] having an opaque wall, no [1:29:35] balconies, disheeld [1:29:36] shield lighting, [1:29:38] screening, and location of [1:29:40] dumpster and loading services [1:29:41] would also be controlled. [1:29:43] Planning commission notes that [1:29:45] the cg which permits a broad [1:29:47] range of commercial uses MAY [1:29:49] generate greater external [1:29:50] impacts, and that what's [1:29:52] proposed are generally lower [1:29:54] intensity and more compatible [1:29:55] with adjacent multifamily [1:29:56] residential development. [1:29:58] I will say too that I did check [1:29:58] this morning. [1:30:02] We've had no e-mails or [1:30:04] communications of opposition or [1:30:06] concern raised from anyone in [1:30:07] the public. [1:30:08] Planning commission continue to [1:30:10] notes were consistent, directs [1:30:11] development toward the [1:30:12] appropriate land use [1:30:14] arrangement, crring [1:30:16] considering the [1:30:17] surrounding uses and miimizes [1:30:19] impacts or incompatibilities and [1:30:20] notes restrictions throughed [1:30:21] planned developments, provides a [1:30:23] more suitable intensity and [1:30:25] scale. [1:30:28] And notes regarding goal 7 that [1:30:29] it promotes employment [1:30:31] opportunities and contributes to [1:30:33] economic growth, and compatible [1:30:34] development pattern providing [1:30:35] appropriate transition between [1:30:36] commercial and residential which [1:30:39] i think is an important finding [1:30:40] by the planning commission for [1:30:43] this particular project. [1:30:45] Development services finds the [1:30:45] evelopment compatible with the [1:30:47] surrounding development pattern. [1:30:48] Staff further finds the [1:30:49] requested pd variance related to [1:30:50] buffering, screening [1:30:50] supportable. [1:30:53] So when you look at the site, [1:30:54] what we would suggest to you is [1:30:58] that the uses under cg would be [1:31:02] terribly impacting, terribly [1:31:03] disrupt fn to [1:31:04] disruptive to the multifamily, [1:31:08] which would be permissible now. [1:31:09] For example car washes, which [1:31:15] would be 24/7, outdoor banquets, [1:31:18] outdoor events, auto repair, [1:31:22] tire repair, restaurants, [1:31:23] 24-hour restaurants, and just [1:31:28] for the record, I would like [1:31:29] to -- one second, if I MAY. [1:31:31] We did get one -- I'm sorry, [1:31:32] there was one letter, I [1:31:36] apologize, there was one email [1:31:42] of concern specifically about [1:31:43] stormwater. [1:31:43] I do have [1:31:45] have a letter here from the [1:31:47] engineer that the site is flat [1:31:49] but does drain south to a north [1:31:50] direction into a storm sewer [1:31:52] system within the west waters [1:31:52] right-of-way. [1:31:53] The site would be subject of [1:31:55] course to all meeting stormwater [1:31:56] requirements of the county and [1:31:59] swfwmd. [1:35:57] The applicant is proposing [1:35:59] enhanced screening along the [1:36:02] eastern and southern property [1:36:04] boundaries adjacent. [1:36:06] This is canopy trees at sa foot [1:36:08] intervals and this enhanced [1:36:10] buffering exceeds the standard [1:36:12] spacing requirements, will help [1:36:13] reduce visual impacts and [1:36:14] provides an appropriate [1:36:15] transition between the proposed [1:36:17] office use and the surrounding [1:36:18] residential development. [1:36:20] And lastly, the proposed [1:36:22] development meets the locational [1:36:24] criteria as the site fronts [1:36:27] along waters avenue and provide [1:36:28] office uses serving the [1:36:29] surrounding community. [1:36:31] Based upon these considerations, [1:36:32] the prayer [1:36:33] public to be [1:36:37] planning commission staff [1:36:39] finds this consistent subject to [1:36:40] the conditions proposed by the [1:36:41] hillsborough county development [1:36:43] services department. [1:36:44] >> hearing master: is there [1:36:44] anyone in the audience that [1:36:46] wishes to speak in support of [1:36:48] the application? [1:36:49] Seeing no one responding. [1:36:50] Anyone in the audience wish to [1:36:56] speak in opposition to the [1:36:56] application? [1:36:58] Seeing no one responding. [1:37:00] Staff anything further? [1:37:03] >> no, sir. [1:37:04] >> hearing master: michelle, if [1:37:05] you could, just the terminology. [1:37:07] In terms of the building itself, [1:37:11] just to be crystal clear, we say [1:37:14] four stories and 48 feet. [1:37:16] How do you -- you have ground [1:37:17] floor parking. [1:37:19] So it's below the building. [1:37:22] And then there's per the [1:37:23] applicant's testimony three [1:37:24] floors of office space. [1:37:27] And then a top floor of the [1:37:29] community gathering area. [1:37:33] So that's -- when you sa four [1:37:36] stories, that's fine. [1:37:37] >> it would not include -- I [1:37:38] believe they said the first [1:37:40] would be open parking. [1:37:42] >> hearing master: the top, open [1:37:42] underneath. [1:37:43] >> right, that would not be [1:37:44] considered a story. [1:37:45] >> hearing master: okay, got it. [1:37:50] Just wanted to make that clear. [1:37:50] All right, very good. [1:37:52] At this point in time, the [1:37:56] applicant has an opportunity for [1:37:56] rebuttal. [1:37:58] >> I would just say quickly that [1:38:01] we did notice 15 persons twice. [1:38:06] So we're glad that the immediate [1:38:07] community did not come forward [1:38:08] with any concerns. [1:38:09] Thank you. [1:38:09] >> hearing master: all right, [1:38:10] very good. [1:38:11] Thank you, sir. [1:38:15] With that, that concludes this [1:38:15] application. [1:38:17] MS. Heinrich, ready for the next [1:38:17] case. [1:38:21] >> next item is d-4, pd 26-0671. [1:38:23] The applicant is requesting to [1:38:29] rezone property from ar and pd [1:38:31] to planned development. [1:38:33] Tania chapela will provide staff [1:38:36] findings after the applicant's [1:38:37] presentation. [1:38:37] >> hearing master: the [1:38:40] applicant, please. [1:38:42] >> kami corbett, 400 north [1:38:46] ashley drive, suite 1100 tampa, [1:38:47] florida 33602. [1:38:50] Subject property is located in [1:38:51] the urban service area along [1:38:53] county road 672. [1:38:55] You can see it's near a lot of [1:38:57] development that is very similar [1:38:59] to what we are proposing. [1:39:01] We are proposing to rezone from [1:39:03] ar to pd. [1:39:05] And there is already a pd that's [1:39:06] approved on part of this site, [1:39:10] but we're converting the whole [1:39:11] thing. [1:39:12] So we are proposing standard [1:39:16] four units to the acre density [1:39:19] of 319 units -- I'm sorry. [1:39:21] Four units to the acre would be [1:39:24] 319 units of proposed density of [1:39:26] 2.75 units to the acre with a [1:39:28] standard 4400 square foot lot [1:39:30] that is pretty common in this [1:39:31] area. [1:39:34] And we have minimum setbacks of [1:39:35] 20 feet. [1:39:37] Corners 10. [1:39:38] Side 5. [1:39:39] Rear 10. [1:39:41] Access, you can see is through [1:39:43] other developments, existing [1:39:43] developments. [1:39:46] So the primary access is to balm [1:39:49] road and we have a cross [1:39:50] connection to west acadia grove [1:39:52] line and you can see in the [1:39:54] staff report that traffic cannot [1:39:58] use that acadia grove lane. [1:39:59] >> hearing master: could you [1:39:59] repeat that? [1:40:00] >> I believe in the staff report [1:40:02] there's a condition that [1:40:03] construction access cannot come [1:40:05] and use -- [1:40:05] >> hearing master: construction [1:40:06] access? [1:40:07] >> yes, construction access [1:40:08] cannot use. [1:40:09] >> hearing master: got it. [1:40:10] >> this has been found [1:40:11] consistent and compatible with [1:40:13] the comprehensive plan or many [1:40:14] policies that staff will review [1:40:15] when they present their reports [1:40:17] and in the interest of time, I [1:40:18] will yield my time and answer [1:40:20] any questions should you have [1:40:20] any. [1:40:21] >> hearing master: no questions. [1:40:22] Thank you. [1:40:30] Development services staff. [1:40:33] >> tania chapela, development [1:40:33] services. [1:40:42] I have a revised report. [1:41:14] >> hearing master: okay. [1:41:18] >> this is a request to rezone [1:41:21] approximately 79.9 acres from ar [1:41:25] and pd 93-0005 to a new planned [1:41:28] development allowing a maximum [1:41:31] of 220 single-family detached [1:41:32] dwelling units. [1:41:36] The proposed density is [1:41:37] approximately 2.75 dwelling [1:41:38] units per acre, below the [1:41:41] maximum density permitted by the [1:41:44] res-4 future land use category. [1:41:48] The project would provide [1:41:51] minimum 4,400 square foot lots, [1:41:53] 40-foot lot width and a maximum [1:41:56] building height of 35 feet. [1:41:58] The surrounding areas include [1:41:59] agricultural and single-family [1:42:01] residential uses to the south [1:42:04] and the east and approved [1:42:06] residential development of [1:42:08] comparable density to the west. [1:42:09] Staff, therefore, finds the [1:42:12] proposal compatible with the [1:42:14] surrounding development pattern. [1:42:15] Development services staff [1:42:16] recommends approval subject to [1:42:19] the proposed conditions. [1:42:21] I'm presenting a revised report [1:42:24] to incorporate the [1:42:24] transportation conditions that [1:42:26] were missing in the previous [1:42:30] version of the report. [1:42:32] >> hearing master: okay, thank [1:42:33] you. [1:42:33] Planning commission staff. [1:42:35] >> lily linehan, planning [1:42:36] commission staff. [1:42:37] The subject property is located [1:42:38] within the residential 4 future [1:42:39] land use category. [1:42:41] It's within the urban service [1:42:42] area and within the limits of [1:42:49] the balm community plan, [1:42:51] riverview community plan. [1:42:52] Objective 1.1 of the future land [1:42:54] use directs approximately 80% of [1:42:57] the county's future growth and [1:42:58] development and F.L.U. Policy [1:42:59] requires that new development be [1:43:01] compatible with the surrounding [1:43:01] area. [1:43:03] The proposed residential [1:43:04] community provides an [1:43:05] appropriate transition between [1:43:06] the existing agricultural and [1:43:08] residential land uses and is [1:43:10] consistent with the established [1:43:11] development pattern in the [1:43:12] vicinity. [1:43:13] Additionally the intent of the [1:43:14] residential 4 future land use [1:43:16] category is to designate areas [1:43:18] that are suitable for low [1:43:19] density residential development. [1:43:22] And this designation permits a [1:43:23] maximum density of four dwelling [1:43:25] units per gross acre. [1:43:27] Based on the site's gross [1:43:30] acreage of 79 acres, under the [1:43:31] residential 4 designation they [1:43:33] could be allowed to consider up [1:43:34] to 319 dwelling units. [1:43:36] The applicant proposes a [1:43:38] residential community consisting [1:43:39] of 220 single-family detached [1:43:41] dwelling units and the proposed [1:43:44] development is of a use and of a [1:43:46] density that does not exceed the [1:43:48] allowable maximum under the [1:43:49] residential 4 future land use [1:43:50] category. [1:43:51] The development is also [1:43:53] consistent with the intent of [1:43:56] F.L.U.'s objective 4.4 and [1:43:57] policy 4.4.1 which require new [1:43:58] development to be compatible [1:43:59] with the character and [1:44:00] development pattern of [1:44:01] surrounding properties. [1:44:02] The proposed residential [1:44:03] community of single-family [1:44:04] detached homes is compatible [1:44:06] with the surrounding development [1:44:07] pattern and serves as a [1:44:09] complementary use to the [1:44:11] existing residential [1:44:11] neighborhoods, agricultural [1:44:12] lands and institutional uses in [1:44:13] the area. [1:44:14] The proposed planned development [1:44:17] is consistent with goal 2 of the [1:44:18] riverview community plan and [1:44:20] goal 1 of the cultural and [1:44:23] historical objective of the [1:44:24] southshore areawide systems plan [1:44:26] and the proposal preserves on [1:44:28] site wetlands and adverse [1:44:30] impacts so it is consistent with [1:44:32] the applicant comprehensive plan [1:44:32] policies and objectives that [1:44:34] cover growth in environmentally [1:44:35] sensitive areas. [1:44:36] Based possible the above [1:44:37] considerations and the following [1:44:39] goals, objectives and policies, [1:44:39] planning commission staff finds [1:44:42] the proposed planned development [1:44:44] consistent with the [1:44:45] unincorporated hillsborough [1:44:45] county comprehensive plan [1:44:46] subject to the proposed [1:44:47] conditions by development [1:44:49] services department. [1:44:50] >> hearing master: all right. [1:44:51] Thank you. [1:44:52] At this point in time, is there [1:44:53] anyone in the audience that [1:44:55] wishes to speak in support of [1:44:58] the application? [1:45:00] Seeing no one responding. [1:45:01] Anyone in the audience wish to [1:45:04] speak in opposition to the [1:45:10] application? [1:45:13] Yeah. [1:45:14] Good evening. [1:45:17] >> I have been sworn in. [1:45:17] >> hearing master: okay. [1:45:18] Good, raise your right hand. [1:45:20] Do you swear to tell the truth, [1:45:21] the whole truth and nothing but [1:45:23] the truth so help you GOD? [1:45:24] >> so help me GOD. [1:45:29] My name is al brunner, I live in [1:45:30] carlton lake road. [1:45:31] I am the PRESIDENT Of the balm [1:45:35] civic association. [1:45:38] And yes, I oppose this [1:45:40] development along with the other [1:45:42] developments that have violated [1:45:44] the balm community development [1:45:47] plan which this already said is [1:45:50] within, which is one house per 5 acres. [1:45:51] We don't want it grouped and we [1:45:53] don't want it reduced. [1:45:57] We already have too much traffic [1:46:02] on that main truck route and [1:46:03] this adds just one more entry [1:46:05] point into that road that's just [1:46:09] a two-lane road. [1:46:12] Our school is overloaded. [1:46:13] Sumner high school, during the [1:46:15] planning and the school board [1:46:16] folks -- when that went in, they [1:46:19] didn't plan. [1:46:20] They did grow so fat. [1:46:22] Within the second year of [1:46:25] operation, it was about 70% [1:46:27] beyond its planned capacity. [1:46:30] I know, my daughter graduated [1:46:30] there. [1:46:32] We don't have the firehouses. [1:46:35] We don't have the medical [1:46:37] response. [1:46:38] Our schools are overloaded and [1:46:40] all you guys do is approve more [1:46:41] and more housing. [1:46:43] Our roads are crap. [1:46:44] The person -- some of the people [1:46:47] in opposition to the apollo [1:46:48] beach that I got to hear before [1:46:49] I jumped in the car to come [1:46:51] running down here from balm, [1:46:55] since I couldn't tune in and be [1:46:59] made a speaker from online. [1:47:01] I literally got here right [1:47:03] before this happened. [1:47:06] Because I'm busy, I'm working, I [1:47:10] do a lot of work travel. [1:47:11] But the area is getting to a [1:47:13] point where I'm going to take my [1:47:15] money and our resources -- [1:47:17] because I make good money -- and [1:47:20] go somewhere else that has good [1:47:22] planning and a balanced planning [1:47:23] and governance for all, not a [1:47:25] select few. [1:47:26] Get the infrastructure in there. [1:47:32] Don't get any more housing by [1:47:33] the tens of thousands. [1:47:33] - [1:47:38] you are coming down 674, 85 to [1:47:39] 15,000 more homes. [1:47:41] We won't even talk about what [1:47:44] that does for reduced [1:47:45] agricultural capacity and [1:47:49] building for food. [1:47:51] While we reduce our capacity to [1:47:52] grow it locally here in [1:47:54] hillsborough county, we're [1:47:55] exponentially increasing that [1:47:56] demand to come from somewhere [1:47:58] else and assuming that those [1:47:59] other places aren't doing the [1:48:02] same thing that we're doing I [1:48:06] reckless overdevelopment with no [1:48:06] infrastructure. [1:48:09] We want to keep one house per 5, [1:48:10] that's reasonable. [1:48:12] It doesn't make these houses so [1:48:13] close together you can spit and [1:48:15] go across three houses. [1:48:16] That doesn't produce them to [1:48:19] make a fire hazard when they are [1:48:21] separated by five to 10 feet [1:48:21] apart. [1:48:22] Where you can actually drive [1:48:23] into your backyard. [1:48:28] You can actually have a [1:48:29] playground. [1:48:33] We need the right [1:48:33] infrastructure. [1:48:34] I am opposed to growth. [1:48:35] I would fight it and stop it [1:48:36] where it is. [1:48:38] I know that won't happen. [1:48:39] But every time we try to do [1:48:43] managed growth, this body keeps [1:48:44] undercutting us and letting the [1:48:46] developers come in and change [1:48:48] the rules by coming in here and [1:48:50] getting more changes. [1:48:52] Every motion to change is for [1:48:54] changing agriculture to high [1:48:54] density. [1:48:55] And when they do get the [1:48:56] approval for a lower density, a [1:48:58] couple of months later they come [1:49:00] in and ask for more density. [1:49:04] When they think nobody else is [1:49:05] watching. [1:49:07] You are making -- you are not [1:49:08] doing balanced governance. [1:49:11] You are not doing balanced [1:49:11] growth. [1:49:12] You're putting all the houses in [1:49:14] one area and no infrastructure [1:49:17] to get to the jobs or create [1:49:20] businesses, industrial, [1:49:20] commercial, etc. That are going [1:49:24] to generate the incomes without [1:49:27] making commutes exponentially [1:49:27] longer. [1:49:30] I know that there is some issues [1:49:31] with the state and some of the [1:49:32] state regulations. [1:49:35] By GOD, we need to fight it. [1:49:36] There's people here that want to [1:49:39] fight it. [1:49:40] So please, let's do balanced [1:49:43] governance. [1:49:46] Let's not violate the community [1:49:47] development plan that balm has [1:49:52] had for the last 20 years any [1:49:52] further. [1:49:55] 1 to 5, I don't like it. [1:49:57] I don't like the balm grove. [1:49:58] It's caused all kinds of [1:49:59] problems. [1:50:02] We're having increased number of [1:50:03] people going on to other [1:50:04] people's properties as a result [1:50:05] of it. [1:50:07] We don't have the -- again, we [1:50:09] don't have the first responders. [1:50:11] We don't have the firehouses. [1:50:13] And everywhere is getting [1:50:14] exponentially longer. [1:50:16] As the person in apollo beach [1:50:19] had said, it's taking them 25 [1:50:21] minutes plus to get just to the [1:50:23] interstate. [1:50:26] I live seven miles off the [1:50:26] interstate. [1:50:28] I have to plan at least 30 [1:50:29] minutes plus whatever traffic [1:50:29] jam there is. [1:50:31] I don't go anywhere during rush [1:50:33] hour because it takes too [1:50:34] doggone long. [1:50:35] Not to mention everybody is [1:50:37] rushing because everybody is [1:50:38] trying to get to their place to [1:50:39] get their demands, whether to [1:50:42] pick up kids from school or [1:50:44] extra activities or just get [1:50:45] gas, just get groceries. [1:50:46] And they are rushing. [1:50:50] and we're having more and more [1:50:50] accidents. [1:50:52] In addition to the planning of [1:50:54] just the overloaded [1:50:55] infrastructure, not to mention [1:51:00] the lack of water that we have, [1:51:12] many of the main they areow [1:51:12] they [1:51:14] and now [1:51:16] everybody has to do u-turns that [1:51:17] generates lines which causes [1:51:19] more people to drive more [1:51:20] reckless to get to where they [1:51:21] want to go and cut more people [1:51:23] off and more accidents, again [1:51:25] without the first responders [1:51:27] that we have in existence [1:51:27] already. [1:51:28] We're already behind. [1:51:29] Thank you for my time. [1:51:32] >> hearing master: thank you, [1:51:32] sir. [1:51:33] Is there anyone else in the [1:51:39] audience that wishes to speak in [1:51:39] opposition? [1:51:41] No one responding. [1:51:43] Staff, anything further? [1:51:45] >> no, sir. [1:51:46] >> hearing master: applicant has [1:51:49] an opportunity for rebuttal. [1:51:50] >> sure, kami corbett again. [1:51:58] Let's go back to one of my [1:52:00] slides that shows -- on the [1:52:03] right, you'll see there's an [1:52:07] existing pd that allows for 200 [1:52:07] units. [1:52:08] And I have a copy of that I'm [1:52:16] going to place in the record. [1:52:17] This will all fit in one place. [1:52:18] Thank you. [1:52:20] So that's existing approved [1:52:20] development. [1:52:23] And so we are just seeking 220, [1:52:25] so we're adding 20 additional [1:52:27] units to what's already [1:52:27] approved. [1:52:29] And we're just spreading the [1:52:31] density around the site. [1:52:34] The issue of density and [1:52:35] intensity as far as the balm [1:52:38] community plan, this subject [1:52:40] site was previously rp-2 which [1:52:41] has now been changed by the [1:52:42] board of county commissioners to [1:52:44] be inside the urban service [1:52:46] boundary and res-4. [1:52:49] And so what we are asking for is [1:52:51] 2.75 units to the acre. [1:52:52] Under the old comprehensive [1:52:54] plan, we would have had to have [1:52:56] had a minimum density of 75%. [1:52:57] The board modified that policy [1:52:59] to allow us to be under, to have [1:53:01] development that is actually [1:53:03] under the maximum density that's [1:53:03] permitted. [1:53:05] And we are below that. [1:53:08] So in terms of traffic and [1:53:10] schools, those are -- this is [1:53:11] not a legislative decision. [1:53:13] This is a quasi-judicial [1:53:14] rezoning decision. [1:53:15] And there are certain rules that [1:53:17] are applied and laws that need [1:53:19] to be applied when analyzing the [1:53:19] case. [1:53:21] And that's what the professional [1:53:22] planners for the county and the [1:53:23] planning commission have done in [1:53:23] this case. [1:53:24] And they have found that the [1:53:26] proposed request is consistent [1:53:28] and respectfully request your [1:53:29] approval. [1:53:30] >> hearing master: okay, thank [1:53:31] you, ma'am. [1:53:34] With that, that concludes this [1:53:35] application. [1:53:36] MS. Heinrich, ready for the next [1:53:36] case. [1:53:39] >> our next application is item [1:53:42] d-5, pd 26-0673. [1:53:43] The applicant is requesting to [1:53:48] rezone property from rfq 9 to [1:53:53] planned development. [1:53:55] Tim lampkin will provide staff [1:53:57] findings after the applicant's [1:54:05] presentation. [1:54:05] >> good evening. [1:54:08] My name is catherine coyle with [1:54:11] bogs engineering, 607 south [1:54:15] alexander striet, plant city [1:54:19] representing the cdc of tampa [1:54:20] incorporated. [1:54:21] The project is located at the [1:54:23] southeast corner of east 23rd [1:54:26] avenue and 65th street. [1:54:29] Next slide. [1:54:31] The project location, as you can [1:54:33] see, just to the north of this [1:54:34] aerial is I-4. [1:54:36] There's a large wetland along [1:54:38] that area. [1:54:40] On the southern portion of this [1:54:41] aerial, the reason I included it [1:54:43] is that's columbus broadway. [1:54:45] That is about 120 feet north of [1:54:47] that roadway is the city of [1:54:50] tampa boundary, which is [1:54:51] predominantly industrial [1:54:51] commercial along that street. [1:54:54] And you can see the development [1:54:55] pattern within the area. [1:55:00] Next slide. [1:55:02] Future land use is residential [1:55:02] 12. [1:55:04] We are proposing 12 units per [1:55:05] acre. [1:55:06] There's no bonus density [1:55:07] requested for this. [1:55:10] This is within the urban service [1:55:10] area. [1:55:11] And water and sewer service is [1:55:12] actually provided by the city of [1:55:18] tampa in this particular [1:55:19] location. [1:55:19] Next slide. [1:55:22] The zoning is rsc-9 currently. [1:55:25] We're requesting the pd for the [1:55:26] units in question. [1:55:27] You'll notice the pattern of [1:55:30] zoning surrounding the area, [1:55:32] rsc-9 is the bulk of the body in [1:55:34] there with pd surrounding from [1:55:36] different years, ranging all the [1:55:40] way back to '84 up to 2024. [1:55:43] There's a scattering of rdc12 as [1:55:46] well and a couple of commercial [1:55:47] properties located in this [1:55:47] particular district. [1:55:49] immediately to the north is [1:55:54] rsc-9, rdc12 and cg to the west. [1:55:55] Rsc-9 to the east. [1:55:57] Next slide. [1:56:00] The surrounding uses -- oh, next [1:56:00] slide, sorry. [1:56:01] Yeah, there you go. [1:56:05] The surrounding uses I put in [1:56:06] there just to show you. [1:56:10] It's a large -- previous slide, [1:56:10] please. [1:56:11] Thank you. [1:56:15] It's a large block. [1:56:17] East 23rd avenue is on the [1:56:18] north. [1:56:21] East 21t is on the south. [1:56:23] 65th is on the west side. [1:56:27] The cg and the rdc12 is on the [1:56:30] west and that is a small -- it's [1:56:33] listed as a store commercial. [1:56:35] It's some type of vending [1:56:35] company. [1:56:36] And they have some outdoor [1:56:38] storage of some equipment. [1:56:40] Then there's a single-family [1:56:42] house as well to the north of [1:56:42] that. [1:56:43] There's four single-family homes [1:56:46] to the north side. [1:56:48] The large parcel to the east is [1:56:50] actually also owned by the [1:56:50] county. [1:56:52] And I just put this in [1:56:53] reference. [1:56:54] This property is owned by the [1:56:55] county as well and it's been [1:57:00] transferred to the cdc for [1:57:01] development. [1:57:02] There are three multi-family [1:57:03] buildings to the south. [1:57:05] And then to the southeast, I [1:57:06] would highlight as well there is [1:57:08] a public school, an elementary [1:57:09] school with parking. [1:57:11] And you can see the parking lot [1:57:11] there. [1:57:15] Next slide. [1:57:18] What's being proposed here, [1:57:19] single-family residential [1:57:20] duplex. [1:57:20] these will be platted as [1:57:22] single-family and sold fee [1:57:22] simple. [1:57:24] This is under agreement with [1:57:24] hillsborough county affordable [1:57:27] housing services to develop [1:57:28] affordable housing for homes [1:57:33] that are 80% ami and under only. [1:57:34] It is limited to that. [1:57:36] 20 units total which meets the [1:57:38] 12 units per acre density. [1:57:40] There are 10 fronting 23rd and [1:57:43] 10 fronting 21st. [1:57:44] The development, as I mentioned, [1:57:46] will be subdivided and platted. [1:57:49] There's a 20-foot front setback, [1:57:50] 6 feet interior between the [1:57:53] buildings, so it's 12 feet [1:57:54] total. [1:57:56] 20-foot side street to north [1:57:59] 65th and 26 feet to the east [1:58:03] side which is lots units 10 and [1:58:03] 20. [1:58:05] We did include an additional [1:58:07] type "b" buffer, a 20-foot [1:58:09] buffer on the east side as well. [1:58:10] Not knowing what that future [1:58:12] development will be, so we [1:58:15] enhanced that buffer on that [1:58:15] side. [1:58:17] And there's large stormwater [1:58:18] area in the center of the [1:58:20] property which will then convey [1:58:21] to 65th. [1:58:23] Next slide. [1:58:26] This is the concept elevation as [1:58:28] of today. [1:58:30] It does resemble a single-family [1:58:32] home, however, those are two [1:58:32] units. [1:58:36] Each is approximately 1400 to [1:58:37] 1450 square feet. [1:58:39] There's two units per building. [1:58:42] Each one will have three [1:58:43] bedroom, two to two and a half [1:58:45] bath and one car garage. [1:58:46] That's the front elevation and [1:58:47] that's the rear elevation. [1:58:48] So we're being careful to make [1:58:51] sure that both sides actually [1:58:54] have some ornamentation to them. [1:58:59] And in summary, next slide. [1:59:02] As I mentioned, what will be [1:59:03] developed is affordable housing [1:59:05] under an active agreement with [1:59:06] hillsborough county affordable [1:59:06] housing services. [1:59:08] The density is consistent with [1:59:09] r-12 land use category. [1:59:11] It is located within the urban [1:59:13] service boundary and serviced by [1:59:15] the city of tampa water and [1:59:15] sewer. [1:59:16] It's compatible with a mix of [1:59:18] existing residential, [1:59:18] commercial, institutional uses [1:59:20] in the surrounding areas. [1:59:22] It has been found consistent by [1:59:23] the hillsborough planning [1:59:24] commission. [1:59:26] We do agree with those findings. [1:59:27] Specifically, I would like to [1:59:29] note in the liveable communities [1:59:31] element under east lake orient [1:59:33] park which is this particular [1:59:36] community, it does note two [1:59:37] points in particular. [1:59:39] New residential development to [1:59:41] provide homeownership are [1:59:42] preferred, which these are going [1:59:43] to be fee simple. [1:59:46] And the plan also speaks to [1:59:46] support affordable housing [1:59:47] opportunities that accommodate a [1:59:48] diverse population and income [1:59:50] levels that promote [1:59:53] homeownership which this does. [1:59:55] This has also been recommended [1:59:56] as approvable by development [1:59:57] services staff with no [1:59:58] objections from other county [2:00:00] staff or external agencies. [2:00:01] We respectfully request your [2:00:02] approval. [2:00:03] >> hearing master: okay, thank [2:00:03] you. [2:00:04] >> thank you. [2:00:05] >> hearing master: development [2:00:09] services staff. [2:00:11] >> good evening, tim lampkin, [2:00:13] development services. [2:00:16] The applicant did a really [2:00:19] thorough overview so I'm going [2:00:20] to breeze through this. [2:00:23] They are proposing development [2:00:26] on approximately 1.71 acres [2:00:28] located on the northeast corner [2:00:31] of north 65th street and [2:00:33] 21st avenue. [2:00:35] They are proposing to permit the [2:00:40] development of 20 affordable [2:00:40] duplexes. [2:00:43] The subject site has frontage [2:00:45] along east 23rd and east [2:00:46] 21st street. [2:00:48] As the applicant stated with [2:00:50] the eastern property boundary [2:00:51] adjacent to vacant hillsborough [2:00:53] county owned property. [2:00:55] The property is surrounded by a [2:00:57] mix of existing residential, [2:00:58] commercial, institutional. [2:01:02] There's a school to the [2:01:02] southeast. [2:01:04] Duplex development is located to [2:01:05] the south. [2:01:08] The school is kinley elementary [2:01:08] school. [2:01:09] And commercial development is [2:01:12] located to the west with a [2:01:13] single-family residential to the [2:01:15] north and northwest. [2:01:17] Overall, the proposed [2:01:18] development provides an [2:01:19] appropriate transition between [2:01:22] the existing duplex development [2:01:25] to the south, the detached [2:01:25] single-family residential, to [2:01:27] the north and northwest. [2:01:28] The applicant has not proposed [2:01:30] any variations. [2:01:32] And based upon the [2:01:33] considerations, staff finds the [2:01:35] request approvable. [2:01:36] Unless you have any questions. [2:01:38] >> hearing master: no questions. [2:01:38] Thank you. [2:01:39] >> hearing master: planning [2:01:40] commission staff. [2:01:41] >> lily linehan, planning [2:01:42] commission staff. [2:01:44] The subject site is within the [2:01:45] residential 12 future land use [2:01:46] category within the urban [2:01:47] service area and within the [2:01:49] limits of the east lake orient [2:01:51] park community plan. [2:01:54] F.L.U.'s policy 3.1.3 requires [2:01:54] new development to be compatible [2:01:56] with surrounding uses. [2:01:59] And F.L.U. Objective 4.4 and [2:02:01] F.L.U. Policy 4.4.1 requires new [2:02:02] development to be compatible [2:02:03] with the surrounding [2:02:04] neighborhood. [2:02:05] The subject site currently [2:02:07] consists of undeveloped vacant [2:02:07] land. [2:02:09] There's single-family, [2:02:10] two-family residential [2:02:11] development in the adjacent area [2:02:16] with some existing [2:02:16] public/quasi-public [2:02:17] institutional uses and this mix [2:02:19] of surrounding land uses [2:02:21] establishes a land pattern that [2:02:23] supports two residential units. [2:02:26] And F.L.U. Objective 3.2 and [2:02:27] policy 3.2.4 require that [2:02:29] community plans throughout the [2:02:30] county be consistent with the [2:02:30] comprehensive plan. [2:02:32] And the housing goal of the east [2:02:33] lake orient park community plan [2:02:36] seeks to create more housing [2:02:38] opportunities within the area by [2:02:40] supporting affordable housing [2:02:41] opportunities that are used to [2:02:43] serve and accommodate a diverse [2:02:44] population and different income [2:02:46] levels and promote [2:02:47] homeownership. [2:02:48] It's also stated that new [2:02:50] residential developments that [2:02:52] provide homeownership are [2:02:53] preferred, however, they are not [2:02:54] required. [2:02:56] The addition of duplex style [2:02:57] residential development where it [2:03:00] currently exists alongside [2:03:00] single-family residential [2:03:01] development further promotes the [2:03:03] diversity of the existing [2:03:05] housing stock and provides [2:03:05] additional affordable housing [2:03:07] opportunities for community [2:03:07] residents. [2:03:10] And the request is for fee [2:03:11] simple housing so that promotes [2:03:12] the additional homeownership [2:03:14] opportunities at an affordable [2:03:17] rate as explicitly required by [2:03:18] the community plan. [2:03:20] Based upon the above [2:03:21] considerations and following [2:03:22] goals, objectives and policies, [2:03:23] planning commission staff finds [2:03:24] the proposed planned development [2:03:26] consistent with the [2:03:27] unincorporated hillsborough [2:03:28] county comprehensive plan [2:03:29] subject to the conditions [2:03:30] proposed by development [2:03:31] services. [2:03:33] >> hearing master: okay, thank [2:03:33] you. [2:03:35] At this point in time, is there [2:03:36] anyone in the audience that [2:03:37] wishes to speak in support of [2:03:41] the application? [2:03:44] >> MAY I speak, please? [2:03:45] >> hearing master: ma'am. [2:03:48] >> I'm patricia blanton, I live [2:03:48] right across the street from [2:03:51] where they want to -- [2:03:51] >> hearing master: ma'am. [2:03:52] >> yes, sir. [2:03:53] >> hearing master: are you here [2:03:55] in support or here in [2:03:56] opposition? [2:03:56] >> I live on 23rd avenue. [2:03:58] And what they want to do is [2:04:00] right in front of my house. [2:04:03] What they want to do is put a [2:04:05] project there. [2:04:07] >> hearing master: ma'am, I need [2:04:08] to hear -- [2:04:14] >> I can't hear, sir. [2:04:14] >> hearing master: michelle, [2:04:15] could you -- maybe if you get [2:04:17] closer to her and ask her if [2:04:24] she's in support or opposition. [2:04:25] >> I oppose. [2:04:37] >> hearing master: hold on. [2:04:38] >> no one is here to oppose it, [2:04:40] they are just going to push it [2:04:40] through. [2:04:41] >> you are here for the [2:04:43] application that was just [2:04:43] presented? [2:04:44] >> the one they just talked [2:04:45] about. [2:04:45] >> okay. [2:04:47] And are you here to talk in [2:04:49] support or opposition? [2:04:51] >> I oppose it. [2:04:51] >> okay. [2:04:54] I think he's going to first call [2:04:57] for support. [2:04:57] >> hearing master: yes. [2:04:58] >> you're for opposition, so [2:05:02] just stay close. [2:05:03] >> okay. [2:05:04] >> hearing master: just give it [2:05:04] a sec. [2:05:05] >> I'm sorry. [2:05:06] I've been sitting here since you [2:05:10] opened the doors. [2:05:11] >> hearing master: understood. [2:05:12] >> my ticket is running. [2:05:13] >> hearing master: there's [2:05:15] probably not anybody here in [2:05:16] support, but let me just ask. [2:05:19] >> I wish you could -- [2:05:20] >> hearing master: ma'am. [2:05:21] Is there anyone in the audience [2:05:26] wish to speak in support of the [2:05:26] application? [2:05:28] No one responding. [2:05:28] All right, ma'am. [2:05:32] Now you wish to speak in [2:05:32] opposition? [2:05:33] >> you can come on. [2:05:34] >> hearing master: ma'am, you [2:05:39] can speak now. [2:05:39] >> hi. [2:05:40] >> hearing master: good evening. [2:05:42] >> I've been in the -- [2:05:43] >> hearing master: ma'am, state [2:05:44] your name. [2:05:47] >> I was first grade in kinley. [2:05:47] Okay. [2:05:48] >> hearing master: ma'am. [2:05:50] >> I've seen so much destruction [2:05:52] here, I can't even tell you how [2:05:52] bad it is. [2:05:53] >> hearing master: can you get [2:05:56] her name for the record. [2:05:56] Hold on. [2:05:58] >> I'm sorry. [2:05:59] I wish I could hear better. [2:06:01] >> hearing master: that's fine. [2:06:02] >> state your name. [2:06:03] >> patricia blanton. [2:06:07] >> hearing master: and your [2:06:08] address. [2:06:10] >> where is the home you are [2:06:11] talking about? [2:06:13] >> I'm talking about the [2:06:16] property on 23rd and 65th [2:06:16] street. [2:06:18] >> what is your address? [2:06:22] >> mine is 6502 23rd avenue. [2:06:23] >> hearing master: great. [2:06:23] Go ahead. [2:06:26] Now you can speak. [2:06:30] >> last week alone, last week [2:06:32] alone 65th street they came in [2:06:34] with bulldozers and just raped [2:06:37] an area of trees that are like [2:06:41] over 200 years old, you know. [2:06:43] In one day, they are all gone. [2:06:46] They put a sign on the fence [2:06:49] over the weekend that the [2:06:52] environmental people were [2:06:52] approved of burning. [2:06:55] Not only did they rape the [2:06:56] trees, but then they wanted to [2:06:57] burn them. [2:07:00] I lost it. [2:07:01] I went and called the [2:07:02] environmental people. [2:07:04] Oh, it's been approved already [2:07:06] on the west side. [2:07:06] Well, guess what. [2:07:12] All the houses are on the east [2:07:12] side. [2:07:14] Flakes go up, houses would. [2:07:15] Bye-bye my home. [2:07:17] Now they want to put a bunch of [2:07:18] homes. [2:07:19] They want to put projects in [2:07:20] front of my house. [2:07:24] That's what they really want to [2:07:24] do, you know. [2:07:28] That whole area is just -- the [2:07:30] state road department was there. [2:07:32] They killed the water there. [2:07:36] And they moved down the '70s [2:07:38] so the lot has been empty, thank [2:07:39] GOD. [2:07:41] It used to be woods there. [2:07:43] You could swim at the end of the [2:07:45] street, natural springwater. [2:07:47] Well, they filled it in. [2:07:48] You know what they said? [2:07:51] I was a little girl. [2:07:53] I asked my mother, why don't [2:07:56] these people do something about [2:07:56] this? [2:07:58] I went as a little girl to this [2:08:02] guy, what are you doing? [2:08:04] We are swimming. [2:08:05] On top of the water the fish [2:08:07] were dead. [2:08:09] Oh, he says, oh, mother nature [2:08:11] will take care of itself. [2:08:13] Well, guess what. [2:08:17] They came in, filled it in with [2:08:18] bricks. [2:08:19] The land sinks like this. [2:08:21] There's a natural spring under [2:08:21] there. [2:08:23] There's going to be a sinkhole [2:08:25] there because when it rains, you [2:08:28] can just see it, where it used [2:08:29] to be. [2:08:33] And now they want to put -- oh. [2:08:35] It hurts my heart to see what [2:08:38] they are doing to my [2:08:39] neighborhood. [2:08:41] I'm so mad right now I'm [2:08:41] shaking. [2:08:45] >> hearing master: I can tell. [2:08:45] Okay. [2:08:47] >> they are so just -- don't [2:08:49] they want to breathe? [2:08:52] There is four recycling plants [2:08:57] within a mile of my home. [2:08:58] I have skin cancers. [2:09:01] i have my own well. [2:09:02] The water is poisoned. [2:09:05] I have filters on the shower, in [2:09:06] the kitchen. [2:09:07] I buy bottled water. [2:09:14] I can't even drink my well [2:09:14] water. [2:09:20] And they want to put more [2:09:20] projects. [2:09:20] What? [2:09:22] They didn't want more in the [2:09:23] city? [2:09:25] They are moving down to my [2:09:26] neighborhood. [2:09:29] Nobody is speaking up. [2:09:30] It's like close your eyes and [2:09:31] guess what. [2:09:33] The next day, the next week, [2:09:35] they are all gone, all those [2:09:36] trees are gone. [2:09:40] I went to that man's face this [2:09:40] morning. [2:09:42] I was shaking, I was so mad. [2:09:43] I said don't you burn. [2:09:47] Please don't burn. [2:09:49] Recycle, grind those trees up, [2:09:53] make them into mulch, you know. [2:09:57] Off of 41, you could take it [2:09:57] there. [2:09:58] You know why they didn't want to [2:10:01] do it that way, because it's the [2:10:05] quickest, cheapest way of doing [2:10:09] it. [2:10:09] >> hearing master: okay. [2:10:10] >> I'm done. [2:10:10] I don't know. [2:10:13] Because in my words, wasting my [2:10:14] time being here because nobody [2:10:18] is going to stand up for my [2:10:18] neighborhood. [2:10:20] Hey, tell them to wait until 10 [2:10:21] years and I'll be gone and I [2:10:23] don't have to watch it. [2:10:24] But you know what. [2:10:27] My son and my family, that was [2:10:28] my mother's house. [2:10:30] I was in that neighborhood when [2:10:36] I was 5 years old. [2:10:38] >> hearing master: thank you. [2:10:42] >> last hurricane on 65th [2:10:43] street, the people that built a [2:10:44] new house in the back, they [2:10:45] built it on a spring. [2:10:47] And guess what happened. [2:10:49] The spring rose up. [2:10:53] They were draining their lot for [2:10:56] two weeks down the thing. [2:11:01] And it hit the apartment halfway [2:11:01] up. [2:11:03] It's going to happen again. [2:11:04] >> hearing master: okay. [2:11:05] >> I had to laugh because I used [2:11:07] to swim there and they filled it [2:11:10] in with cement and block and [2:11:13] built a house on it. [2:11:14] [Laughter] [2:11:15] It's all about the money and the [2:11:19] power in this town. [2:11:21] I'm a poor rich gal. [2:11:27] I don't owe anybody, but I don't -- I own my property and [2:11:31] my truck. [2:11:32] >> hearing master: yeah. [2:11:32] All right. [2:11:33] Thank you, ma'am. [2:11:35] >> they don't need that many [2:11:37] buildings in front of my house. [2:11:38] >> hearing master: okay. [2:11:42] >> come on! [2:11:42] >> hearing master: okay. [2:11:43] Thank you, ma'am. [2:11:44] >> what's going to happen with [2:11:47] all the -- [2:11:51] you go down columbus drive on [2:11:53] 65th street, they turned it [2:11:56] into trucker haven where all the [2:11:57] big rigs are. [2:11:58] And I was afraid. [2:12:00] That's why I was here today. [2:12:01] >> hearing master: ma'am. [2:12:01] >> I was afraid that they were [2:12:03] going to rezone it to where they [2:12:06] could allow to do that because [2:12:08] that's what they'll do. [2:12:09] >> hearing master: okay. [2:12:10] >> these truckers don't have any [2:12:12] place to sleep or park their [2:12:12] trucks. [2:12:17] They are parking it on 65th [2:12:18] street. [2:12:18] >> hearing master: all right. [2:12:19] thank you, ma'am. [2:12:19] Thank you. [2:12:22] >> I need to calm down. [2:12:23] >> hearing master: ma'am, let me [2:12:24] see if there's anyone else that [2:12:26] wishes to speak. [2:12:27] Ma'am, if I could get you to [2:12:27] sign in over here. [2:12:29] Sign your name over here. [2:12:30] >> I'm sorry, what? [2:12:31] >> hearing master: sign your [2:12:32] name over there. [2:12:37] >> sign it over there. [2:12:37] Yeah. [2:12:38] >> hearing master: thank you, [2:12:44] ma'am. [2:12:45] Is there anyone else in the [2:12:47] audience that wishes to speak in [2:12:52] opposition to the application? [2:12:53] No one responding. [2:12:55] Staff, anything further? [2:12:56] >> no, sir. [2:12:57] >> hearing master: okay. [2:12:58] The applicant has an opportunity [2:13:02] for rebuttal. [2:13:04] >> thank you. [2:13:06] Catherine coyle again for the [2:13:07] record. [2:13:08] As I mentioned previously, this [2:13:10] is under an agreement with [2:13:12] hillsborough cunty affordable [2:13:13] housing. [2:13:14] This will not be projects as [2:13:14] mentioned. [2:13:16] These are going to be fee simple [2:13:18] homes so they will be owned [2:13:19] individually, each unit. [2:13:22] There are 10 units facing [2:13:25] 23rd, which is MS. Blanton's [2:13:27] street and 10 facing south. [2:13:29] All I can say is it is the [2:13:31] intent of the affordable housing [2:13:32] services department of the [2:13:33] county to improve this [2:13:34] neighborhood and establish [2:13:38] homeownership in this area, to [2:13:40] better solidify the improvements [2:13:42] in this area and not overbuild. [2:13:43] It does meet the density of the [2:13:45] comprehensive plan. [2:13:47] there is no additional bonus [2:13:48] sought. [2:13:49] There are no variances sought. [2:13:50] We have added additional buffers [2:13:53] to the east side and to the west [2:13:55] as well, 20 plus feet with [2:13:57] additional plantings. [2:14:04] And as you saw in the layout -- [2:14:07] I can use the overhead. [2:14:09] This is, as mentioned -- I [2:14:10] cannot speak to the spring that [2:14:11] used to be there or anything. [2:14:13] But this is a volume sensitive [2:14:15] piece of property. [2:14:16] So there is a stormwater issue [2:14:19] out here which is why there is a [2:14:22] large stormwater pond planned [2:14:23] for the center of the project [2:14:27] that will convey to 65th. [2:14:28] This will again, as I mentioned, [2:14:31] tap into public water and sewer [2:14:33] with the city of tampa. [2:14:34] There are many properties in [2:14:36] this area to the north and the [2:14:37] surrounding area that don't [2:14:41] actually tap in to the public [2:14:41] utilities. [2:14:42] As mentioned by the neighbor, [2:14:46] with the well and the septic. [2:14:47] So I cannot speak to the [2:14:48] condition of her water. [2:14:50] I can say that they will be [2:14:51] serviced by the city of tampa [2:14:56] and not put any additional [2:14:57] impediments to her water. [2:14:59] >> hearing master: have you done [2:15:00] preliminary engineering on the [2:15:01] site? [2:15:02] >> we are working through that [2:15:04] now actually and this pond is [2:15:05] being sized accordingly. [2:15:07] >> hearing master: very done any [2:15:08] geo tech out here? [2:15:11] >> it was actually just [2:15:11] completed. [2:15:12] >> hearing master: all right. [2:15:13] Anything else? [2:15:13] >> that's it. [2:15:16] We just respectfully request [2:15:16] your recommendation. [2:15:18] >> hearing master: thank you, [2:15:19] ma'am. [2:15:21] With that, that concludes this [2:15:21] application. [2:15:24] Ready for the next item. [2:15:26] >> our next application is item [2:15:30] d-6, major mod 26-0800. [2:15:33] The applicant is requesting a [2:15:37] major modification to pd [2:15:37] 97-0182. [2:15:39] This is traveling with a [2:15:41] comprehensive plan amendment [2:15:42] and, therefore, both the [2:15:43] comprehensive plan amendment and [2:15:45] this rezoning will be heard at [2:15:48] the OCTOBER 8th bocc cpa [2:15:51] public hearing. [2:15:52] >> hearing master: okay. [2:15:55] The applicant, please. [2:16:02] >> thank you, good evening. [2:16:04] Isabella hoff t.1000 north [2:16:05] ashley drive. [2:16:07] This is a little bit over [2:16:09] 24-acre site located in the [2:16:10] thonotosassa community plan. [2:16:12] It is also in the rural service [2:16:13] area. [2:16:15] And as MS. Heinrich said, there [2:16:16] is a pending comprehensive plan [2:16:18] amendment to res-2. [2:16:20] And the zoning currently is [2:16:24] approved for 14 residential [2:16:24] lots. [2:16:25] >> hearing master: where are you [2:16:28] in the process with the plan [2:16:28] amendment? [2:16:30] >> we went through the first [2:16:31] public hearing of the planning [2:16:33] commission and now we're waiting [2:16:34] for the board. [2:16:35] >> hearing master: you went to [2:16:36] the planning commission. [2:16:36] >> yes. [2:16:37] We went to the planning [2:16:37] commission. [2:16:38] >> hearing master: and it was [2:16:40] heard and they voted on it? [2:16:42] >> it was heard and voted for [2:16:44] denial. [2:16:44] >> hearing master: denial. [2:16:47] >> yeah. [2:16:47] >> hearing master: okay. [2:16:49] >> and so if you look at the [2:16:49] - [2:16:52] area, the surrounding area is [2:16:53] mostly residential. [2:16:56] And the lot ranges -- the lot [2:17:00] size ranges from.2 acres to [2:17:03] over 5 or 10 acres. [2:17:08] The residential lots are located -- the more intensive [2:17:08] uses on the east side while the [2:17:11] west side is a bit more rural [2:17:14] and the south side is mostly [2:17:17] agricultural land. [2:17:20] So the request is for 30 units [2:17:21] from the approved 14. [2:17:24] The density is proposed at 1.2 [2:17:25] dwelling units to the acre. [2:17:29] And this is to mimic currently [2:17:31] all the residential 1 mostly [2:17:34] surrounding the lake. [2:17:37] And prior to the comp plan [2:17:41] amendment, the site is about 65% [2:17:43] of the site is already [2:17:44] residential 1 while the rear [2:17:45] portion is ar. [2:17:52] So the request was for r-2 to [2:17:53] allow for development for less [2:17:55] than an acre development. [2:17:56] What you can see also is with [2:17:58] the new stormwater rules, it [2:17:59] takes a large portion of the [2:18:00] property. [2:18:01] So, therefore, the development [2:18:03] is kind of like being pushed in [2:18:03] the back. [2:18:05] That's why we are requesting [2:18:07] that half acre lots. [2:18:07] However, it's still going to be [2:18:09] the density that's similar to [2:18:12] the surrounding area. [2:18:13] Development services staff found [2:18:16] it compatible with the [2:18:17] surrounding area. [2:18:19] Planning commission, they found [2:18:20] it inconsistent. [2:18:24] Mostly when you read the report, [2:18:27] they basically say that the [2:18:28] nothing in the rural area should [2:18:31] be less than 5 acres, one unit [2:18:33] to 5 acres as shown on the land [2:18:35] use map. [2:18:36] However, our site, like I said, [2:18:38] of about 15 acres is already [2:18:39] residential 1 plus the 9-acre [2:18:40] was the ar. [2:18:43] But the amendment is for [2:18:44] residential 2 which is 2 units [2:18:48] to the acre permitting over 40 [2:18:49] units. [2:18:51] But we're just limiting it to 30 [2:18:52] units. [2:18:56] They also found naming different [2:18:58] policies, 3.1.3 and 4.4.1. [2:19:01] They kept referencing that the [2:19:02] density is not compatible with [2:19:03] the area. [2:19:07] And, therefore, they found it [2:19:08] inconsistent. [2:19:11] They also at the same time found [2:19:13] that the lots for policy [2:19:15] 4.4.7 -- that the lots around [2:19:18] the lake are mostly one unit to [2:19:20] the acre and therefore the land [2:19:21] fronting the lake should not [2:19:23] have a density greater than one [2:19:24] unit pr the acre. [2:19:26] And because we're doing 1.2, [2:19:30] they found it inconsistent with [2:19:30] that. [2:19:31] And the report goes on and on [2:19:34] and on just about that the [2:19:36] density is too intense for the [2:19:37] area, yet you're supposed to [2:19:40] review it as a residential 2 [2:19:42] which is two units to the acre. [2:19:44] And so you go to page 4, they [2:19:46] keep talking about the proposed [2:19:47] density is not compatible with [2:19:48] the existing development [2:19:49] pattern, even though there's [2:19:53] lots of smaller sites all along [2:19:56] the lake. [2:19:58] They talk about again the [2:20:00] density, the development [2:20:00] proposed is not compatible with [2:20:01] the area. [2:20:04] And they talk about saying [2:20:05] that -- I don't know how they [2:20:06] came up to that, but the [2:20:08] immediate surrounding area on [2:20:12] average is density of one per 45 acres. [2:20:13] Again, I don't exactly now [2:20:15] know how [2:20:16] they calculated that. [2:20:18] So they go on and on about that. [2:20:23] And then they go to the [2:20:24] community plan and naming, you [2:20:26] know, the third goal is that we [2:20:33] are not meeting the -- I was [2:20:37] just a bit baffled by the staff [2:20:38] report. [2:20:39] When we looked at it, we felt [2:20:42] like we met all those policies [2:20:43] that even they had stated. [2:20:47] We felt like we met those [2:20:48] policies under the res-2 which [2:20:50] allows half acre lots, which [2:20:52] allows two units to the acre and [2:20:53] everything. [2:20:56] And so it also per the community [2:20:58] plan provides a different [2:21:00] housing style that meets the [2:21:01] goal number 4. [2:21:03] It also as you can see on our [2:21:08] plan, it was protecting the [2:21:08] environmental features of the [2:21:10] site which is what we are doing [2:21:11] on the north side of the [2:21:14] thonotosassa road. [2:21:17] And so with that, we felt like [2:21:18] looking at all those policies [2:21:22] that we do feel like the request [2:21:24] pd is consistent with the [2:21:26] residential 2 future land use. [2:21:29] And so this kind of concludes my [2:21:30] application and my presentation [2:21:30] for now. [2:21:32] But I'm here if you have any [2:21:32] questions. [2:21:33] >> hearing master: all right, [2:21:34] thank you. [2:21:35] >> thank you. [2:21:36] >> hearing master: development [2:21:52] services staff. [2:21:54] >> good evening, tania chapela, [2:21:55] development services. [2:21:57] I'm presenting a revised report [2:22:00] with changes to the cpa number [2:22:03] that was incorrect in the [2:22:08] first -- it was prior to [2:22:13] certification condition, I'm [2:22:14] sorry. [2:22:16] Pd 26-0800 is a major [2:22:18] modification to increase the [2:22:19] approved development from 14 to [2:22:22] a maximum of 30 single-family [2:22:24] detached dwelling units. [2:22:27] The approximately 1.24 units per [2:22:29] acre density is below the [2:22:32] maximum anticipated under the [2:22:33] res-2 future land use [2:22:36] designation proposed through [2:22:38] concurrent cpa 26-10. [2:22:39] The development would provide [2:22:43] minimum half acre lots. [2:22:44] 90-foot lot widths and maximum [2:22:48] building height of 35 feet and [2:22:49] residential setbacks intended to [2:22:53] maintain the area's low density [2:22:53] character. [2:22:55] The site is within thonotosassa [2:22:57] community plan area and is [2:23:01] surrounded by primarily vacant [2:23:02] agricultural and single-family [2:23:04] residential properties. [2:23:06] Staff finds the proposed use and [2:23:07] development standards comparable [2:23:09] to the surrounding residential [2:23:10] pattern. [2:23:11] The wetland area north of [2:23:14] thonotosassa road would remain a [2:23:16] private common area with limited [2:23:20] passive recreational use and no [2:23:22] private pleasure craft access. [2:23:24] The environmental permitting [2:23:26] requirements would continue to [2:23:26] apply. [2:23:28] Based on this consideration, [2:23:30] staff finds the request [2:23:31] compatible with the surrounding [2:23:33] area and recommends approval [2:23:35] subject to the proposed [2:23:35] conditions. [2:23:36] >> hearing master: okay, thank [2:23:37] you. [2:23:38] Planning commission staff. [2:23:39] >> lily linehan, planning [2:23:40] commission staff. [2:23:42] This rezoning is concurrent with [2:23:46] the comprehensive plan amendment [2:23:48] hc/cpa 26-10 which is a request [2:23:50] to change the future land use to [2:23:52] residential 2. [2:23:54] This has been reviewed as it [2:23:55] holds the residential 2 future [2:23:56] land use designation. [2:23:57] The site is within the rural [2:23:58] area and within the limits of [2:24:01] the thonotosassa community plan. [2:24:05] F.L.U. Objective 1.2 and 1.2.1 [2:24:07] and 1.2.2 defines rural area for [2:24:10] long-term agricultural uses, [2:24:11] large lot uses and undeveloped [2:24:12] natural areas. [2:24:15] The major modification is for 30 [2:24:18] single-family units on [2:24:18] 34.22 acres. [2:24:20] Based on the pending land use [2:24:21] change to residential 2. [2:24:24] While the single-family use is [2:24:26] compatible with the character, [2:24:27] the density is not compatible [2:24:28] with the existing rural [2:24:30] character of the area and based [2:24:32] on initial staff calculations, [2:24:33] the immediate surrounding area [2:24:36] is on average ata density of 1 [2:24:37] dwelling unit per 45 acres with [2:24:40] the surrounding uses being large [2:24:41] agricultural rural lots and low [2:24:43] density residential. [2:24:44] Additional analysis was done on [2:24:46] the stone lake ranch area in [2:24:49] development which is [2:24:50] approximately 2,100 feet west of [2:24:52] the subject site and located on [2:24:54] the west side of lake [2:24:54] thonotosassa. [2:24:56] The density of the stone lake [2:25:00] ranch development equates to [2:25:03] approximately one dwelling unit [2:25:06] to 4 gross acres and clustered. [2:25:07] Based on the analysis of the [2:25:08] surrounding existing community, [2:25:10] the proposed density is not [2:25:11] compatible with the existing [2:25:13] rural community character. [2:25:15] Furthermore, F.L.U. Policy 4.4.7 [2:25:18] calls for lands fronting a water [2:25:20] body to have density and/or [2:25:23] intensity comparable and [2:25:26] compatible with others and based [2:25:27] on the current existing future [2:25:29] land use categories that [2:25:31] surround lake thonotosassa, the [2:25:33] eastern portion of the lake has [2:25:35] the agricultural rule 1 to 5 [2:25:36] designation and the western [2:25:38] portion is surrounded by the [2:25:38] residential 1 designation. [2:25:40] There are no future land use [2:25:41] categories along the lake that [2:25:43] have a density greater than one [2:25:45] dwelling unit per gross acre. [2:25:46] While there is a concurrent [2:25:49] future land use amendment for [2:25:51] the residential 2 designation, [2:25:54] F.L.U. Policy 4.4.7 calls for [2:25:55] comparable density along the [2:25:56] water bodies outside the urban [2:25:57] service area. [2:25:59] A portion fronts along the south [2:26:00] side of lake thonotosassa. [2:26:01] Based upon the maximum allowable [2:26:03] density per the surrounding [2:26:04] future land use designations, [2:26:05] the land fronting the lake [2:26:07] should not have a density that [2:26:08] exceeds one unit per acre in [2:26:09] order to be consistent with this [2:26:10] policy direction. [2:26:12] The subject site is located [2:26:14] within the boundaries of the [2:26:15] thonotosassa community plan. [2:26:17] Goal 3 of this plan emphasizes [2:26:18] the importance of maintaining [2:26:20] the area's rural residential [2:26:22] character, open space and [2:26:23] agricultural. [2:26:24] The proposed modification of 30 [2:26:26] single-family units on half acre [2:26:28] lots is characterized as smil [2:26:30] rural development and does not [2:26:32] maintain the current low density [2:26:33] rural pattern found within the [2:26:34] surrounding areas. [2:26:36] Furthermore, the comprehensive [2:26:38] plan strategies listed out in [2:26:40] the thonotosassa community plan [2:26:42] list out requiring minimum sizes [2:26:43] of 1 acre for residential [2:26:45] development within the [2:26:45] residential 1, agricultural [2:26:47] state and agricultural rural [2:26:49] future land use categories. [2:26:52] And even to protect the area's [2:26:52] rural character. [2:26:54] And while the proposed rezoning [2:26:55] is accompanied by a future land [2:26:56] use amendment to the residential [2:26:58] 2 category which is not [2:27:00] technically required to have a [2:27:03] minimum lot size of 1 acre, [2:27:03] according to the community plan, [2:27:05] the site is adjacent to and [2:27:06] surrounded by residential 1 and [2:27:09] agricultural rural 1 to 5 [2:27:10] designations on all sides and [2:27:11] should remain sensitive to the [2:27:14] lot size requirements of these [2:27:14] designations. [2:27:15] Based upon the above [2:27:16] considerations and following [2:27:18] goals and objectives and [2:27:20] policies of the comprehensive [2:27:20] plan, planning commission staff [2:27:22] finds the proposed major [2:27:25] modification inconsistent. [2:27:26] >> hearing master: thank you. [2:27:27] At this point in time, is there [2:27:28] anyone in the audience that [2:27:30] wishes to speak in support of [2:27:36] the application? [2:27:37] Good evening. [2:27:38] >> good evening. [2:27:40] My name is lori walker. [2:27:45] My address is 13016 country view [2:27:46] road, dover, florida. [2:27:49] I live about two miles away from [2:27:51] this area. [2:27:53] I just saw the sign for the [2:27:58] first time -- signs on friday, [2:28:01] which they were way away from [2:28:03] the road that's only two lanes [2:28:06] that people are going down. [2:28:08] I wouldn't have even seen them [2:28:12] had the county not have mowed. [2:28:13] It's heart breaking because we [2:28:18] were just here a few months [2:28:18] back. [2:28:19] Right down the street less than [2:28:22] a mie away, it's already been [2:28:24] approved for 14 homes. [2:28:26] I'm fine with that down [2:28:27] . [2:28:30] Down the street, another 14 [2:28:30] homes. [2:28:31] You know change is going to [2:28:32] change. [2:28:33] People are going to buy stuff. [2:28:34] But we are ag. [2:28:36] We are res-1. [2:28:39] We want to continue that. [2:28:42] Our roads can't handle this. [2:28:45] The roads are so potholed out, [2:28:47] they barely fix them. [2:28:51] Half of the road on the other [2:28:52] side of the -- on the [2:28:53] thonotosassa side where they [2:28:55] want to put two houses, that's [2:28:57] very low lying. [2:28:59] It's always flooded out. [2:29:01] There's cypress over there. [2:29:02] The road kind of crumbles on [2:29:07] that side of the road all the [2:29:07] time. [2:29:08] The other one that's been [2:29:10] approved, they are supposed to [2:29:11] resurface the road. [2:29:12] That doesn't help. [2:29:13] It helps somewhat, but that's [2:29:15] not going to take care of the [2:29:17] traffic problem. [2:29:18] Had I have had more time, I [2:29:22] would have brought video of [2:29:25] traffic, more people would have [2:29:25] came. [2:29:27] We want to keep it where it is. [2:29:29] We don't want rezoning. [2:29:33] If they want to do the 14 [2:29:34] houses, most everyone that I [2:29:37] have talked to, we're okay with [2:29:37] that. [2:29:39] Don't rip out everything. [2:29:40] Don't tear everything down. [2:29:45] You go down kingsway from [2:29:46] thonotosassa, they are nice [2:29:47] homes that are being built on [2:29:49] big lots. [2:29:54] they are not taking everything [2:29:54] away. [2:29:58] We're just seeing it day by day [2:30:02] getting torn down. [2:30:04] And literally, the [2:30:08] infrastructure can't handle it. [2:30:12] So I oppose going forward with [2:30:14] 30 more homes, you know, in that [2:30:14] area. [2:30:15] You're putting another -- just [2:30:17] say three, four people in a [2:30:18] home. [2:30:20] That's another 90 to 120 people [2:30:22] using this little tiny dinky [2:30:26] road that's going to be [2:30:27] resurfaced. [2:30:29] Thank you for your time and your [2:30:29] consideration. [2:30:30] >> hearing master: all right, [2:30:32] thank you, ma'am. [2:30:34] All right. [2:30:35] Let me back track. [2:30:37] Is there anyone in the audience [2:30:38] that wishes to speak in support [2:30:40] of the application? [2:30:45] It's okay. [2:30:47] See no one responding. [2:30:48] Anyone else in the audience that [2:30:49] wishes to speak in opposition to [2:30:51] the application? [2:30:51] >> yes. [2:30:52] >> hearing master: please come [2:30:52] forward. [2:30:54] >> we also have two individuals [2:30:56] online. [2:31:03] >> hearing master: okay. [2:31:04] Good evening. [2:31:06] >> good evening, MR. Zoning [2:31:06] master. [2:31:10] My name is robert alvi ask. [2:31:14] I reside at 11907 thonotosassa [2:31:14] road. [2:31:17] I am also speaking for my [2:31:20] daughter elizabeth who resides [2:31:22] at 11907 thonotosassa road. [2:31:25] She cannot attend tonight. [2:31:26] She's working second shift and [2:31:29] can't be here. [2:31:32] I'm not sure why we're even [2:31:32] here. [2:31:34] a couple of years ago, this [2:31:37] property went up for a major [2:31:38] modification. [2:31:39] And it went before the county [2:31:40] commission acting as the zoning [2:31:43] board and was denied. [2:31:45] They tried for 24 homes, one to [2:31:47] an acre. [2:31:49] It does not fit the area. [2:31:52] It should not exist. [2:31:54] A couple of years later, we come [2:31:56] along and now they are trying [2:31:57] for 48 through the back door at [2:32:00] the planning commission. [2:32:03] Well, that didn't work either. [2:32:33] The math just doesn't work. [2:32:34] If 24 isn't viable, 30 certainly [2:32:39] isn't. [2:32:40] So, and, of course, everybody [2:32:43] harps on the roads. [2:32:46] Don't know if you know it or [2:32:48] not, but thonotosassa/plant city [2:32:52] road is I believe the oldest [2:32:54] paved road in unincorporated [2:32:55] hillsborough county. [2:32:57] It does not need to be modified [2:33:00] to handle the increased traffic. [2:33:00] Paved, yeah. [2:33:10] Modified, no. [2:33:11] That cannot be allowed. [2:33:14] It's historical. [2:33:17] Everybody else has said the same [2:33:17] thing. [2:33:18] The planning commission was [2:33:25] correct. [2:33:27] It doesn't fit, it shouldn't be [2:33:32] there, and I urge you to report [2:33:34] that to the commission [2:33:35] >> hearing master: thank you, [2:33:35] sir. [2:33:40] >> thank you, sir. [2:33:40] >> hearing master: is there [2:33:41] anyone else in the audience that [2:33:51] wishes to speak in opposition? [2:33:52] I thought I heard someone else [2:33:53] say they wanted to speak, maybe [2:33:56] I'm mistaken. [2:33:58] No one else wants to speak in [2:34:01] opposition, at this point in [2:34:01] time -- [2:34:03] >> we have people online. [2:34:06] >> there were two people online. [2:34:07] >> hearing master: all right, [2:34:08] next speaker, please. [2:34:10] >> suzie lee. [2:34:10] >> can you hear me? [2:34:11] >> yes. [2:34:17] >> hi, I'm sue zealy, I live on [2:34:17] red hawk lane. [2:34:23] I'm speaking in opposition of [2:34:24] mm260800. [2:34:26] First, this area simply cannot [2:34:29] and should not sustain this type [2:34:31] of development on the table. [2:34:33] And addition ali, it's not [2:34:35] consistent with the area, it's [2:34:36] incompatible with the [2:34:38] comprehensive plan, and found to [2:34:41] be inconsistent by staff. [2:34:43] The road is substandard, which I [2:34:46] know everybody's gone over. [2:34:48] Did you know that thonotosassa [2:34:50] road is designated as a rural [2:34:51] scenic corridor? [2:34:54] How can it be rural or scenic if [2:34:57] it's full of traffic. [2:35:01] It's just -- it's just insane. [2:35:03] For every house, concrete pad [2:35:05] and additional pavement brought [2:35:07] in the area, the consequences to [2:35:09] the outlying area, and the [2:35:13] residents who have been here [2:35:15] forever are awful, they flood, [2:35:16] there's flooding where flooding [2:35:18] has never occurred. [2:35:21] When they built the stone lake [2:35:22] ranch division that was [2:35:24] referenced earlier, I have [2:35:26] friends with horse farms who [2:35:27] flooded who had never flooded [2:35:30] before, as a result of that [2:35:30] development. [2:35:32] So the consequences to the [2:35:33] residents that have been here, [2:35:35] it's just not fair. [2:35:37] They pay with the flooding, they [2:35:38] pay with the traffic, the [2:35:41] congested roads, and their [2:35:42] lifestyle. [2:35:43] our rural lifestyle out here, [2:35:44] it's totally disrupted. [2:35:47] And I'm not even going to [2:35:49] mention the wildlife that also [2:35:49] suffers. [2:35:53] We're called to be caretakers, [2:35:57] not destroyers of the land. [2:35:59] I'm not against growth, but this [2:36:01] growth is unparalleled in our [2:36:02] county, and it needs to be [2:36:06] stopped. [2:36:08] Especially during the drought. [2:36:10] Our roads and our environment [2:36:11] can't sustain it. [2:36:13] We will have no future for our [2:36:15] children and grant children if [2:36:17] we just continue at this pace. [2:36:19] So please, I ask you, do not let [2:36:20] this move forward. [2:36:22] Thank you. [2:36:23] >> mayor ross: okay, thank you, [2:36:26] ma'am. [2:36:27] I believe there's another person [2:36:30] on line that wishes to speak? [2:36:39] >> yes. [2:36:42] My name is teagan zealy. [2:36:54] I'm here in opposition to [2:36:54] mm26-0800. [2:36:57] I apologize for repeating [2:36:59] everything that everybody else [2:37:02] is on saying, but it needs to be [2:37:03] heard. [2:37:06] Thonotosassa is designated as a [2:37:08] rural scenic corridor, not a [2:37:12] road full of clustered planneds [2:37:13] development. [2:37:15] It isn't designed to handle the [2:37:17] traffic it deals with. [2:37:18] Furthermore, even on the row [2:37:22] zoning application summary, it [2:37:24] states that thonotosassa road is [2:37:26] substandard, and the future [2:37:30] improvements of the road are [2:37:31] substandard. [2:37:33] The property in question is [2:37:35] surrounded on all four sides [2:37:39] with ar designation, and res-1 [2:37:40] designation, that's not [2:37:41] compatible with res 2. [2:37:44] How do you get res-2 out of [2:37:46] completely being surrounded with [2:37:48] ar and res-1. [2:37:49] The rezoning application [2:37:50] actually states in one spot, [2:37:53] that to the northeast of the [2:37:56] property or the northwest, to [2:37:57] the northwest of the property, [2:37:59] there are houses on less than 1 [2:38:01] acre lots, I would encourage you [2:38:03] to look at the map. [2:38:05] There's a lake to the northwest [2:38:05] of the property. [2:38:09] So I'm not sure how they came up [2:38:11] with that one. [2:38:13] Pretty much everything else I [2:38:14] wanted to say, the staff has [2:38:16] already said. [2:38:17] I completely concur with what [2:38:19] the staff has said about it not [2:38:21] being compatible, it just does [2:38:22] not make sense. [2:38:24] I can repeat that if you wish. [2:38:25] I won't waste your time unless [2:38:28] you'd like me to. [2:38:30] So just going into it, the [2:38:32] proposed request does not [2:38:34] further the vision of the [2:38:35] thonotosassa community plan, [2:38:38] which requires one acre lot [2:38:39] minimum for residential [2:38:41] development, and it does not [2:38:44] promote compatibility within an [2:38:45] established rural community. [2:38:50] I respectfully request you to [2:38:54] deny this application thank you. [2:38:56] >> hearing master: thank you, [2:38:56] ma'am. [2:38:57] Is there anyone else in the [2:39:00] audience or online that wishes [2:39:04] to speak in opposition. [2:39:07] At this point in time, [2:39:08] development services staff, [2:39:09] anything further? [2:39:12] >> michelle heinrich, it was [2:39:14] noted by MISS Albert and we [2:39:17] neglected to put in our report [2:39:20] that if the project is [2:39:22] successful in changing to the [2:39:25] res 2 future land use category, [2:39:27] the senior corridor will change [2:39:30] from a rural to scenic suburban [2:39:31] corridor, it will go down from [2:39:34] 30 feet to 15 feet. [2:39:35] >> hearing master: all right, at [2:39:37] this point in time, the [2:39:40] applicant has an opportunity for [2:39:45] rebuttal. [2:39:50] >> william malloy, tampa, [2:39:52] florida. [2:39:54] There are two distinct points I [2:39:56] want to touch on, the first is [2:39:57] thonotosassa road, we are on the [2:39:59] hook, and it's in the staff [2:40:01] report for making sure that [2:40:05] thonotosassa road is [2:40:07] appropriately wide and [2:40:09] resurfaced, one mile to the west [2:40:11] to taylor road, that's a pocket [2:40:13] of r-6 right there, we're going [2:40:17] from r-2, building a mile of [2:40:19] road, to r-6, that's compelling. [2:40:21] The planning commission has put [2:40:24] a lot of merit in the idea that [2:40:27] we're putting lakes -- excuse [2:40:29] me, houses on the lake, and we [2:40:32] need to make some kind of [2:40:34] adjustment with the lake. [2:40:36] We have no development planned [2:40:37] north of thonotosassa road. [2:40:40] All of our development is south. [2:40:45] If you see the site plan, it's [2:40:47] houses, two giant ponds. [2:40:49] Skip the right-of-way, and yes [2:40:51] our parcel front is the lake. [2:40:52] We're not developing on the [2:40:54] lake, it's far from it. [2:40:55] There's a point I'd like to make [2:40:55] too. [2:40:58] That I think has to be [2:40:58] addressed. [2:41:01] This case should be heard and [2:41:03] judged as though r2 were in [2:41:04] place today. [2:41:06] And I'm of the firm opinion that [2:41:08] that staff report from the [2:41:09] planning commission does not [2:41:09] consider that. [2:41:11] Thank you. [2:41:11] >> hearing master: thank you, [2:41:13] sir. [2:41:15] okay, with that, that concludes [2:41:17] this application, and MR. [2:41:18] Malloy, please sign in. [2:41:21] And michelle, do we wan the to [2:41:22] take a break now or -- [2:41:26] >> sure, sounds good. [2:41:28] >> hearing master: let's just [2:41:31] take a 10 minute break, we'll [2:41:32] reconvene at 8:50. [2:43:18] >> thank you. [2:43:19] >> hearing master: ladies and [2:43:21] gentlemen, if we could be [2:43:23] seated, reconvening tonight's [2:43:30] AUGUST 24th, 2026zhm hearing. [2:43:31] Folks, if we could have a seat, [2:43:33] if we could get going, we have [2:43:34] three more items on tonight's [2:43:40] agenda. [2:43:46] >> our next application is [2:43:46] rz-pd26-0803. [2:43:53] The applicant is requesting to [2:43:59] rezone pd85-0286 and spi-uc-2 to [2:44:05] planned development. [2:44:10] This is combined with another [2:44:11] amendment that will be heard in [2:44:13] OCTOBER. [2:44:16] >> kami corbett, tampa, florida. [2:44:18] This site is located in the [2:44:22] university mall area, directly [2:44:23] north of the university area [2:44:25] mall, and this is the plan [2:44:26] amendment that michelle is [2:44:29] referring to, currently r20, [2:44:32] we're having a plan amendment [2:44:34] only to the west side of the pd [2:44:36] parcel, and I'll explain that in [2:44:39] a minute, to r35, and the [2:44:41] planning commission has found [2:44:42] that request consistent. [2:44:45] Both staff and the planning [2:44:46] commission. [2:44:48] The existing use was really [2:44:50] for -- what you have is on the [2:44:54] eastside of 22nd street, there's [2:44:58] an existing A.L.F., on the west [2:45:00] side is an existing retirement [2:45:03] home, and then there's a [2:45:05] parcel -- we'll number the [2:45:06] parcels in a little bit. [2:45:08] There was another parcel to the [2:45:10] east, this is like a major [2:45:11] modification, because it's a new [2:45:12] pd because we're adding [2:45:19] property. [2:45:22] The original pd that had [2:45:23] different parcels. [2:45:27] The alf parcel 4 is a drainage [2:45:28] and storm water area, that is [2:45:29] owned and controlled by the [2:45:31] property owner that owns the [2:45:33] eastside of 22nd street. [2:45:35] >> okay. [2:45:43] >> my client purchased both [2:45:45] parcel 2 and the other parcel. [2:45:47] The purpose of this request was [2:45:49] to allow for traditional [2:45:51] multifamily to be located on [2:45:55] parcel 2 and in the spi-uc [2:45:57] rather than limit them to [2:45:57] retirement. [2:45:59] The reason why we had to bring [2:46:02] in the whole pd, there was a [2:46:07] blended density at one point. [2:46:11] The A.L.F. Is computed [2:46:12] differently. [2:46:14] We had to get the additional [2:46:17] density allowed, and to leave [2:46:18] them whole. [2:46:20] I think they only built 110 [2:46:22] beds, but they have entitlement [2:46:24] for more, and we can't take that [2:46:25] away from them. [2:46:28] This is the new parcel [2:46:28] configuration. [2:46:30] In the old pd zoning, they had [2:46:33] different labels, parcels, we [2:46:34] now in the staff report refer to [2:46:37] the eastside as parcel b and [2:46:37] parcel a. [2:46:41] And what we're asking for is two [2:46:42] development options. [2:46:45] The first is to allow parcel a [2:46:47] to be used as multifamily in the [2:46:49] existing buildings, no [2:46:51] redevelopment of the site, just [2:46:53] able to convert what's already [2:46:55] there, regular multifamily, no [2:46:56] age restriction. [2:46:58] The second was to allow for a [2:47:00] redevelopment of parcel a and [2:47:02] set paramounters for that in the [2:47:04] future, the immediate plan is to [2:47:09] utilize what's existing there at [2:47:10] parcel a. [2:47:12] And then this further -- this is [2:47:17] just additional explanation to [2:47:19] what I just said, regarding up [2:47:22] to 480 multifamily units on [2:47:23] parcel a. [2:47:25] That that's part of the comp [2:47:26] plan request. [2:47:29] We're asking for some pd [2:47:30] variations, related to the [2:47:32] buffering and screening, you can [2:47:35] see there's adequate buffering [2:47:36] there,ing and the idea is, we're [2:47:39] going to utilize these existing [2:47:39] buildings. [2:47:42] Staff has found the request [2:47:43] consistent and compatible with [2:47:44] the comprehensive plan. [2:47:46] There are no, os from any [2:47:47] reviewing agencies, and I'm here [2:47:50] to answer questions should you [2:47:50] have any. [2:47:51] >> hearing master: no, no [2:47:52] questions. [2:47:53] Thank you. [2:48:00] Development services staff. [2:48:03] >> good evening, tim lampkin [2:48:03] development services. [2:48:05] The applicant's proposing to [2:48:08] rezone approximately 22 acres, [2:48:12] it's located just over 200 feet [2:48:14] north of the intersection of [2:48:18] north 22nd street and university [2:48:19] square mall club drive, which is [2:48:22] the ring road surrounding [2:48:25] university mall north of fowler. [2:48:33] The overall project includes [2:48:40] what's currently zoned pd and [2:48:40] spi-uc-2. [2:48:41] Development standards are [2:48:44] applicable to parcel a. [2:48:49] Which is on the eastside of the [2:48:49] parcel. [2:48:59] Parcel a consists of [2:49:01] approximately 13.8 acres, and [2:49:03] they're allowed to have a [2:49:06] maximum of 483 dwelling units. [2:49:08] the staff report does say -- [2:49:10] there will be a revised staff [2:49:11] report submitted later. [2:49:14] The staff report says 484 and it [2:49:25] should be 483 units. [2:49:28] The remaining acreage of parcel [2:49:30] b is within the existing pd, and [2:49:33] developed within an assisted [2:49:34] living facility. [2:49:36] As the applicant states, parcel [2:49:44] b is approved for 260 adult [2:49:48] congregate living a.Cl.F. Beds. [2:49:52] There are no changes whatsoever [2:49:54] to parcel b. [2:49:56] The applicant's requesting [2:49:58] relief from the 2 for 1 [2:50:01] compatibility set back, ldc [2:50:05] section 6.01 which requires [2:50:07] structures with a permitted [2:50:09] height over 20 feet, to provide [2:50:11] additional 2 feet of set back, [2:50:12] for every one foot over th [2:50:13] building height. [2:50:17] The staff notes under option [2:50:19] one, a maximum allowable height [2:50:22] of 98 feet with a 1 to 1 set [2:50:22] back. [2:50:25] Based on additional set back [2:50:27] requirements, a setback of 98 [2:50:29] would BEth be required, [2:50:31] recognizes existing building [2:50:32] heights and set backs, the [2:50:37] applicant proposes to allow [2:50:38] demolition of the development in [2:50:43] parcel b, and to develop it as a [2:50:43] multifamily. [2:50:48] Option a would be keep it as is [2:50:50] with the assisted living [2:50:55] facility, or have multifamily [2:50:56] unage restricted with the [2:50:58] existing configuration. [2:51:01] The applicant has submitted [2:51:03] justification for the proposed [2:51:04] relief, which staff has reviewed [2:51:06] and has no objections. [2:51:07] The staff also reviewed and [2:51:09] you'll make a determination, [2:51:12] they submitted a variance to [2:51:16] allow no buffer in lieu of the [2:51:18] required 20 foot type b parcel [2:51:22] a's, eastern boundary. [2:51:23] So more specifically, the [2:51:25] applicant's intent for [2:51:27] requesting the variation is not [2:51:28] the buffer on the eastern [2:51:30] boundary of the property, [2:51:32] because it's mitigated through [2:51:33] existing site conditions, [2:51:36] including a large wetland area. [2:51:39] Mature trees, are currently [2:51:40] preserved, and will continue to [2:51:44] be preserved by the new pd. [2:51:45] Staff has reviewed the [2:51:47] justification, and finds they [2:51:50] meet the criteria based upon the [2:51:52] above consideration, staff finds [2:51:58] the request approvable, subject [2:51:59] to conditions [2:52:00] >> hearing master: okay, thank [2:52:02] you. [2:52:04] >> lillian linehan plnning [2:52:04] commission staff. [2:52:06] The subject site is located [2:52:16] within the r-20 area, the urban [2:52:19] development boundaries. [2:52:23] To change the land use to r-35 [2:52:27] on folio 3629 will-0000. [2:52:28] The analysis provided is based [2:52:31] on this future land use [2:52:32] amendment. [2:52:35] Objective 3.1 requires that new [2:52:37] development be redesigned with [2:52:40] due consideration, and be [2:52:41] compatible with the established [2:52:43] character of the development. [2:52:45] The subject site is developed [2:52:47] with the villas and is situated [2:52:50] in an area that is characterized [2:52:54] of a diverse mix of commercial, [2:52:56] institutional and senior living [2:52:56] uses. [2:52:59] The surrounding land use [2:53:00] pattern, and the existing urban [2:53:01] character of the area. [2:53:03] The proposed amendment is [2:53:04] compatible with the existing and [2:53:06] with the existing planned [2:53:08] development in the vicinity, as [2:53:10] it would allow for additional [2:53:12] residential density. [2:53:15] while maintaining compatibility [2:53:17] and community character, with [2:53:20] 13.8 acres and r-35. [2:53:20] - [2:53:22] that portion of the subject site [2:53:26] can consider up to 483 dwelling [2:53:26] units. [2:53:28] The proposed request is not [2:53:29] modified,ed existing development [2:53:30] program remains within the range [2:53:33] of uses and development [2:53:35] intensities, contemplated by the [2:53:36] future land use designations. [2:53:38] The proposed planned development [2:53:41] is also consistent with goal two [2:53:42] of the university area community [2:53:43] plan, as it facilitates [2:53:48] residential uses and an area [2:53:50] targeted for redevelopment and [2:53:50] reinvestment. [2:53:54] The planned development supports [2:53:56] the expanding of housing [2:53:58] opportunities and encouraging [2:53:59] redevelopment of underutilized [2:54:00] properties. [2:54:02] The proposed planned [2:54:04] development, provides on site [2:54:06] wetlands, making the request [2:54:07] condition sift end with the [2:54:10] objectives and policies that [2:54:11] govern growth in environmentally [2:54:13] sensitive areas. [2:54:14] Based on the above [2:54:15] considerations, and the [2:54:17] following goals, objectives and [2:54:20] policies, planning commission [2:54:25] staff finds this plan consistent [2:54:26] with the hillsborough county [2:54:27] comprehensive plan. [2:54:30] >> tim lampkin again. [2:54:32] I just realized, hi a couple [2:54:34] other minor items that will be [2:54:36] part of a revised staff report, [2:54:37] and I wanted to put those into [2:54:38] the record. [2:54:42] On the cover page, says 6.8 acre [2:54:44] modified parcel, it should be [2:54:46] parcel a located. [2:54:49] And on the 3rd bullet point, add [2:54:52] a requirement on parcel a just [2:54:54] to specify for more clarity, [2:54:55] it's only parcel a. [2:54:58] And then on the next bullet [2:55:00] point, cross out the modified [2:55:03] parcel and just specify parcel [2:55:06] a, and then on the last [2:55:08] paragraph, regarding the current [2:55:10] comprehensive plan amendment, [2:55:11] crossout modified and put parcel [2:55:12] a. [2:55:14] And then on the first bullet [2:55:16] point, cross out the property [2:55:18] after six acres and the folio [2:55:24] number which is 36928-0000. [2:55:26] And then correct the acreage in [2:55:29] all instances. [2:55:31] The density for the requirement, [2:55:34] it was rounded up to 14, the [2:55:37] actual is 13.8. [2:55:46] And then to add 260 adds for [2:55:46] clarity. [2:55:50] And on the east set back, on [2:55:55] page 2 at parcel a250 feet, [2:55:58] parcel b at 250 feet. [2:55:59] Parcel d at 35 feet. [2:56:02] And that concludes, thank you. [2:56:03] >> hearing master: when do you [2:56:05] think those changes will be in [2:56:05] optics? [2:56:06] >> tomorrow morning. [2:56:10] >> hearing master: thank you. [2:56:11] At this point in time, is there [2:56:13] anyone in the audience that [2:56:17] wishes to speak in support of [2:56:18] the application? [2:56:20] Seeing no one responding, anyone [2:56:22] in the audience wishing to speak [2:56:25] in opposition to the [2:56:26] application? [2:56:29] Seeing no one responding. [2:56:29] Staff anything further? [2:56:32] >> yes, of course, MISS Corbett [2:56:34] can address this when she comes [2:56:36] up for her rebuttal, we received [2:56:38] an email from her today [2:56:40] regarding some revised [2:56:41] conditions, and I didn't know if [2:56:46] she was still proposing those or [2:56:46] not. [2:56:48] >> hearing master: we'll let her [2:56:51] address that on rebuttal. [2:56:55] Applicant, an opportunity for [2:56:55] rebuttal? [2:56:58] >> kami corbett, in reviewing [2:57:00] them, I think I've decided not [2:57:01] to pursue them this evening. [2:57:03] Some of them are nice to have, [2:57:05] and they're not anything that [2:57:06] needs to be introduced this [2:57:07] evening [2:57:13] >> hearing master: okay. [2:57:15] I listened to the changes, they [2:57:17] sounded like typos. [2:57:18] >> correct, they were [2:57:19] clarifying. [2:57:20] Most of the changes we [2:57:22] submitted, we're clarifying, [2:57:23] making them better or more [2:57:24] clear, and that's why I didn't [2:57:26] go into all of that this [2:57:26] evening. [2:57:28] I didn't think it was important. [2:57:30] >> hearing master: got it. [2:57:30] Okay. [2:57:31] Anything else? [2:57:33] >> no, thank you. [2:57:33] >> hearing master: with that, [2:57:40] that concludes this application. [2:57:45] >> our next application is [2:57:45] mm26-0822. [2:57:47] The applicant is requesting a [2:57:52] modification from pd92-0135. [2:57:54] Tim lampkin will provide staff's [2:57:56] findings after the applicant's [2:57:58] presentation. [2:58:02] Applicant please opinion. [2:58:03] >> good evening. [2:58:07] Todd pressman, 200 second [2:58:10] avenue, st. Petersburg, florida. [2:58:14] This is 260822. [2:58:16] The sd supports, no agency [2:58:17] objections, and as of this [2:58:22] morning, there were no emails or [2:58:25] letters in the record. [2:58:27] We're in the brandon area, 1.78 [2:58:28] acres. [2:58:31] Located just immediately south [2:58:32] of state route 60. [2:58:35] There are two parcels on [2:58:35] morningside drive. [2:58:37] right behind that commercial [2:58:39] structure as you see there. [2:58:41] Issue is a major modification [2:58:46] for multifamily duplex, to multi [2:58:46] multifamily. [2:58:49] Proposed 16 units and two [2:58:49] structures. [2:58:52] The current pd is 18 duplexes, [2:58:54] two common buildings, and one [2:58:56] single family. [2:59:00] And we're proposing 16 townhome [2:59:01] units. [2:59:03] So again two parcels the with [2:59:04] the commercial building to the [2:59:04] north. [2:59:06] Looking at the budding uses is [2:59:08] the commercial building, you [2:59:10] have commercial to the west. [2:59:12] You have a small residential, [2:59:14] that's also zoned cg. [2:59:17] To the rear is commercial, and [2:59:19] to the east are two single [2:59:22] family residentials. [2:59:24] Planning commission notes the [2:59:25] surrounding development, [2:59:27] consists of a mixture of [2:59:29] commercial and residential uses. [2:59:31] Development services notes the [2:59:33] same thing, a mixture of [2:59:37] commercial, shopping retail, [2:59:39] restaurants and automotive [2:59:41] oriented businesses on brandon [2:59:42] boulevard. [2:59:43] With residential subdivision [2:59:46] generally located # behind the [2:59:47] commercial frontage. [2:59:49] Which is what this area is. [2:59:51] Both those findings are [2:59:52] important, because it [2:59:54] characterize the vicinity very [2:59:58] well, in terms of the [2:59:59] compatibility or the existence [3:00:02] of the commercial and the [3:00:03] residential next to each other [3:00:04] throughout that corridor. [3:00:08] So when you look at the zoning, [3:00:11] you'll see cg, and the rsc-6, [3:00:13] which is similar to the [3:00:13] corridor. [3:00:17] And future land use is oc20, [3:00:19] which is a more intensive [3:00:20] category. [3:00:21] That is reflected along the [3:00:24] corridor as the zoning is. [3:00:27] So the east abutting, in terms [3:00:29] of the abutting uses, I'm [3:00:31] showing you the townhome [3:00:33] structure, that is the eastern [3:00:35] townhome structure, there's 2. [3:00:36] Looking specifically at the [3:00:38] buffer, we show on the plan, a [3:00:41] 20 foot building set back and a [3:00:43] 10 foot type a with ornamental [3:00:43] trees. [3:00:46] As we went through a lot of [3:00:47] discussions, both with natural [3:00:49] resources and the staff, on the [3:00:50] certified plan, we're going to [3:00:53] show that as a 15 foot buffer. [3:00:56] So we were able to expand that [3:01:01] additional 5 feet, primarily cr [3:01:03] roads and transportation found [3:01:05] us a few extra feet, so that [3:01:06] will be five feet extra on this [3:01:08] site, I want to highlight that [3:01:10] to you, so there's no confusion [3:01:12] when you look at the pd plan. [3:01:13] Importantly, on that eastside, [3:01:14] as I have it. [3:01:18] I have it as 125 feet from [3:01:19] building to building. [3:01:21] The two residentials are located [3:01:24] pretty far from this site. [3:01:27] They're located fronting on the [3:01:30] access street, which is [3:01:31] morningside [3:01:31] morningside. [3:01:38] So there is a lot of physical [3:01:40] separation between the two on [3:01:41] the eastside. [3:01:43] And just to give you an idea, [3:01:44] you can see the station behind [3:01:46] the site, these are the [3:01:48] residential -- the two [3:01:50] residentials, you see the front [3:01:51] on morningside. [3:01:53] On the west, I'm showing you the [3:01:54] single townhome structure as [3:01:57] well on the west. [3:02:00] The plan shows the 10-foot [3:02:02] building set back, we'll be able [3:02:04] to expand that another five [3:02:08] feet, on this certified plan [3:02:11] will show a 5 foot -- a 10 foot [3:02:14] wide buffer, versus the 5 foot, [3:02:16] we're going to eke out another 5 [3:02:16] feet. [3:02:18] It's important to know that [3:02:20] residential structure is only [3:02:22] half of the distance, the other [3:02:24] distance is commercial activity, [3:02:27] and commercial zoning where [3:02:30] notes come. [3:02:32] And there's substantial [3:02:33] forestation and screening, that [3:02:34] would be above and beyond what [3:02:36] code calls for. [3:02:40] I have it as 35 feet, but again, [3:02:41] with some good screening between [3:02:43] the two. [3:02:44] Development services notes with [3:02:46] the additional proposed [3:02:48] buffering and screening, they [3:02:50] find the uses compatible and [3:02:52] supportable, with the additional [3:02:54] proposed landscaping and [3:02:55] buffering. [3:02:55] Planning commission notes that [3:02:58] the attached homes would provide [3:03:00] a residential use that is [3:03:05] compatible with the existing [3:03:07] residential. [3:03:08] Compatible with existing [3:03:09] development patterns around the [3:03:12] area. [3:03:13] It is substantially below the [3:03:15] maximum that could be allowed. [3:03:18] It is consistent with valrico [3:03:21] community goal plan 1. [3:03:23] Strategy 2, also important to [3:03:24] notice, this would be a [3:03:26] reduction of trips, not a lot, [3:03:29] it would be 23 in the 24 hour [3:03:31] volume, and just a little bit in [3:03:32] the A.M. And peak hour. [3:03:33] With that, we're happy to answer [3:03:38] the questions you MAY have. [3:03:39] >> hearing master: you went [3:03:42] through how you added five feet [3:03:44] additional buffering side. [3:03:45] the staff met with you and [3:03:49] discussed that, and are they [3:03:51] supporting the variance to the [3:03:52] landscaping buffering? [3:03:54] >> yeah, supporting it along [3:03:55] with the change I indicated to [3:03:56] you, yes. [3:03:58] Both on the east and west. [3:03:59] >> hearing master: got it, thank [3:04:01] you. [3:04:03] At this point -- are you done? [3:04:05] >> yes, thank you. [3:04:06] >> hearing master: development [3:04:07] services staff? [3:04:10] >> good evening. [3:04:12] And to clarify, the applicant is [3:04:14] not requesting any variance of [3:04:17] the buffer, but I'll go through [3:04:18] it, and make certain that [3:04:25] portion is really clear and why [3:04:27] he is -- staff had compatibility [3:04:29] concerns du to the proximity of [3:04:31] the structure, to the existing [3:04:34] single family home to the east [3:04:35] and to the southwest. [3:04:37] And due to that, I reached out [3:04:38] to the applicant and as the [3:04:43] applicant stated, transportation [3:04:44] planner was able to determine [3:04:47] that there was a road didn't -- [3:04:49] the road didn't need to be as [3:04:51] wide as the applicant initially [3:04:53] thought, so there was an [3:04:55] additional ten feet, and the [3:04:56] applicant provided to increase [3:05:02] the buffer on the west -- I'm [3:05:07] sorry, on the west side from 5 [3:05:09] feet to 10. [3:05:13] Yeah, from five feet to 10 feet [3:05:15] type a with ornamental trees. [3:05:19] Where before they were proposing [3:05:25] a 10-foot -- I'm sorry, a 5-foot [3:05:26] with. [3:05:28] Let me look at the site plan. [3:05:38] Bear with me one second. [3:05:40] Essentially they increased the [3:05:42] buffer 5 feet on each side. [3:05:47] And it increases the set back 5 [3:05:50] feet on each side. [3:05:52] Doing that staff was able to [3:05:53] find it supportable. [3:05:56] The applicant's request is to [3:05:59] develop 16 townhomes, and two [3:06:01] different structures, replacing [3:06:08] the existing entitlements. [3:06:10] And -- and as the applicant [3:06:13] stated, there is a substantial [3:06:15] distance from the single family [3:06:17] home, however, if someone sells, [3:06:20] they could be a lot closer than [3:06:22] they are right now. [3:06:24] The applicant's requesting [3:06:26] relief, though, he's not [3:06:28] requesting any variations, he's [3:06:29] skieding the land development [3:06:30] code requirements. [3:06:33] He's requesting relief from the [3:06:35] additional 2 for 1, which is one [3:06:36] additional foot for every foot [3:06:38] over 20 feet. [3:06:39] So he's going 35. [3:06:41] That's 30 feet. [3:06:43] And he's not meeting that. [3:06:47] And he's provided justification [3:06:49] within his narrative for the [3:06:51] relief of the additional 30 foot [3:06:53] set back, for the proposed [3:06:55] townhome height, and adjacent [3:06:57] single family homes. [3:06:58] The applicant is required -- [3:07:00] normally, he would be required [3:07:02] to provide a 5 foot wide buffer [3:07:04] with type a screening. [3:07:06] In lieu of not meeting the [3:07:07] additional compatibility [3:07:09] standard for the height, over [3:07:13] 20, he's enhancing the buffer. [3:07:14] Staff does note that the current [3:07:16] approval limits development on [3:07:20] the subject property to 18 [3:07:22] one-story duplex structures with [3:07:24] a maximum density of 11 units [3:07:33] per acre, as established by [3:07:33] pd92-0135. [3:07:36] And the applicant also has [3:07:37] provided further justification [3:07:40] with their narrative request for [3:07:41] relief. [3:07:44] Further proposed, 30 foot [3:07:45] townhome height. [3:07:47] staff acknowledges the existing [3:07:49] single family residence on the [3:07:51] adjacent property situated [3:07:52] toward the front portion of the [3:07:54] parcel, and currently separated [3:07:55] by a proposed development, [3:07:57] however, the zoning of the [3:07:59] parcel would allow redevelopment [3:08:02] and a setback of 25 feet. [3:08:03] Therefore, staff evaluated it [3:08:07] the way we did, based upon what [3:08:08] could be built there. [3:08:10] With the additional proposed [3:08:11] buffering and screening. [3:08:14] Staff finds the proposed [3:08:19] mitigated, and the uses [3:08:20] compatible with the support, the [3:08:22] additional proposed landscaping [3:08:24] and buffering, and based upon [3:08:26] all that, staff finds the [3:08:29] request approvable. [3:08:30] >> hearing master: okay. [3:08:32] Thank you. [3:08:33] Planning commission staff? [3:08:36] >> lily linehan, planning [3:08:36] commission staff. [3:08:39] The site is designated as office [3:08:40] commercial 20 on the future land [3:08:41] use map. [3:08:43] The site is within the urban [3:08:46] service area within the limits [3:08:48] of the valrico community plan. [3:08:50] There's a transition between [3:08:51] established commercial and [3:08:52] residential development. [3:08:54] There are commercial uses [3:08:55] located to the north and wet of [3:08:56] the site. [3:08:58] And residential is located to [3:09:00] the south and east. [3:09:01] This is compatible with the [3:09:06] existing residential uses and [3:09:08] provides an appropriate use -- [3:09:10] under flu objective 2.2 and [3:09:13] policy 2.2.1, the category [3:09:17] allows for the consideration of [3:09:20] compatible development with a [3:09:24] maximum capacity of 708 acres, [3:09:29] up to 35 dwelling units MAY be [3:09:31] considered, approximately 9 [3:09:35] dwelling units per acre, which [3:09:39] is below the max allowed. [3:09:44] This meets the objective of flu [3:09:48] 1.1, objective 4.4, and 4.4.1, [3:09:49] by providing appropriate [3:09:50] transition between the [3:09:51] commercial and residential uses [3:09:52] that are existing. [3:09:55] The proposed density is below [3:09:59] the maximum presented. [3:10:01] The applicant is also proposing [3:10:04] to preserve the existing natural [3:10:07] forestation along the site. [3:10:10] And providing forest taking for [3:10:12] the adjacent residential [3:10:13] properties. [3:10:15] Morningside drive is a [3:10:18] substandard roadway, and has [3:10:20] committed to road improvements. [3:10:21] And these commitments are [3:10:24] consistent with the [3:10:25] infrastructure and mobility [3:10:28] goals of the valrico community [3:10:28] plan. [3:10:29] The planning commission staff [3:10:32] finds the major modification [3:10:34] consistent with the [3:10:35] unincorporated hillsborough [3:10:35] county comprehensive plan. [3:10:37] Subject to conditions proposed [3:10:40] by the development services [3:10:40] department. [3:10:44] >> hearing master: thank you. [3:10:44] Is there anyone in the audience [3:10:45] that wishes to speak in support [3:10:46] of the application? [3:10:49] Seeing no one responding? [3:10:51] Anyone in the audience wish to [3:10:53] speak in opposition to the [3:10:53] application. [3:10:56] Seeing no one responding. [3:10:56] Staff, anything further? [3:10:59] >> no, sir. [3:11:00] >> hearing master: applicant, an [3:11:02] opportunity for rebuttal? [3:11:04] >> just to put on the record, we [3:11:06] noticed 24 people, I believe we [3:11:08] noticed twice, we've had no [3:11:10] feedback or response, thank you. [3:11:11] >> hearing master: thank you, [3:11:12] with that, this concludes this [3:11:17] application. [3:11:20] We are ready for the next case. [3:11:23] >> pd26-0974. [3:11:25] The applicant is requesting to [3:11:30] rezone property from as-1 to [3:11:33] planned development. [3:11:40] Chris granlinier will present [3:11:41] after the applicant's [3:11:44] presentation. [3:11:45] >> hearing master: applicant [3:11:46] please. [3:11:49] >> good evening, brian deon, [3:11:51] johnson pope, 400 north ashley [3:11:55] drive, tampa florida. [3:11:57] I'm here on behalf of the [3:11:58] applicant. [3:12:03] Leaders company, llc, regarding [3:12:04] pd26-0974, the proposed [3:12:06] development consists of a single [3:12:08] story convenience store of [3:12:11] approximately 4,852 square feet, [3:12:12] with a maximum of 12 fueling [3:12:15] stations. [3:12:17] The request is to change the use [3:12:21] category from as-1 to pd. [3:12:23] The future land use category [3:12:28] will remain unchanged. [3:12:30] Staff has identified some issues [3:12:33] today that I wish to aggress. [3:12:36] -- address, that really fall [3:12:38] into two separate categories. [3:12:40] Is this a neighborhood serving [3:12:41] commercial development [3:12:42] appropriate at this location? [3:12:44] And the record demonstrates that [3:12:45] it is. [3:12:47] The second question involves [3:12:49] several technical matters [3:12:51] concerning wetlands, really two [3:12:53] separate issues, wetlands and [3:12:54] transportation issues that [3:12:57] remain to be finalized, and [3:13:00] we're asking to condition our [3:13:01] development on addressing those [3:13:03] two matters, which I will get [3:13:06] into more detail with. [3:13:07] While we understand there's [3:13:10] legitimate issues that are being [3:13:11] addressed through -- that need [3:13:13] to be addressed through [3:13:15] subsequent approvals, this is a [3:13:18] pd rezoning application. [3:13:20] Our request today is rather [3:13:21] straightforward. [3:13:22] We approve the land use, subject [3:13:25] to the conditions that we are [3:13:28] going to request, and ask the [3:13:33] county to consider with this pd [3:13:33] application. [3:13:36] The site would be used for a [3:13:37] convenience store for gas [3:13:38] stations. [3:13:40] There would be a maximum of 12 [3:13:43] pumps and a canopy serving those [3:13:43] pumps. [3:13:47] We meet isr and far [3:13:47] requirements. [3:13:48] Building coverage requirements, [3:13:51] and parking space [3:13:51] requirementsing. [3:13:53] The building would be one story. [3:13:57] We have implemented front rear [3:13:59] and side set backs that match [3:14:02] the set backs that are [3:14:03] consistent with the surrounding [3:14:06] area. [3:14:09] This is the general location of [3:14:11] the property. [3:14:14] Surrounding this area, first and [3:14:16] foremost, we have veterans [3:14:18] highway, which is.3 miles from [3:14:18] the site. [3:14:25] And there's also additional [3:14:27] storefronts, there's walmart 1.3 [3:14:28] miles away. [3:14:30] There are restaurants that are [3:14:33] about 2 miles away as well, such [3:14:36] as olive garden. [3:14:37] This is the plan, which I am [3:14:40] going to provide a little more [3:14:41] zoomed in version of it. [3:14:43] In the red shows the general [3:14:44] location of the building. [3:14:44] - [3:14:47] as mentioned, it is within the [3:14:50] wetlands setback, which we are [3:14:53] asking to condition the pd [3:14:56] approval on a variance for the [3:14:57] wetlands set back itself. [3:14:59] and then you can see the buffers [3:15:01] that we have set up around the [3:15:01] property. [3:15:03] The wetland just to show you [3:15:07] visually is in the northwest [3:15:09] corner of the property. [3:15:13] And we would also be developing [3:15:16] sidewalks and pedestrians access [3:15:18] points for -- that are 10 feet [3:15:19] wide, that would provide a [3:15:22] sidewalk itself, but also allow [3:15:34] for bikes to traverse in the [3:15:43] immediate area. [3:15:45] The property -- I do have my [3:15:46] engineer here, who can address [3:15:47] the drives in and out, as well [3:15:49] as the sidewalks. [3:15:52] >> good evening, jeremy anderson [3:15:55] here, with common oak [3:15:56] engineering, orlando. [3:15:57] Thank you for the opportunity to [3:15:58] be here before you tonight. [3:16:00] I'm going to talk a little bit [3:16:03] about the proposed driveway [3:16:05] access points that are proposed. [3:16:06] >> hearing master: okay. [3:16:08] >> we have a right in, right out [3:16:11] driveway, proposed to bellamy [3:16:13] road, which is the drive on the [3:16:15] east end side of the project [3:16:15] there. [3:16:20] It is proposed to be restricted [3:16:22] with a raised median. [3:16:26] The driveway access includes [3:16:27] right-of-way expansion. [3:16:29] This driveway is going to be [3:16:31] designed in conformance with the [3:16:36] traffic study that has been [3:16:36] prepared. [3:16:38] And again is going to include a [3:16:39] raised median as well. [3:16:41] It will include a right-of-way [3:16:42] expansion on both sides of the [3:16:43] road. [3:16:47] We will be working with the [3:16:49] county on that expansion, on the [3:16:51] east hand side. [3:16:56] For the driveway connection [3:16:59] onner lick, it's another right [3:17:00] in, right out driveway. [3:17:03] it includes a left turn lane [3:17:05] extension for the eastbound [3:17:05] driver. [3:17:09] And a new right turn lane into [3:17:12] the property for that westbound [3:17:12] driver. [3:17:16] Once again, that right turn lane [3:17:18] is going to require an expansion [3:17:19] of the right-of-way. [3:17:21] Not only for the right turn [3:17:25] lane, but also the multiuse [3:17:28] trail that's depicted there and [3:17:30] a crossed hatch manner. [3:17:32] Utilities -- utility services [3:17:35] are available, there's a force [3:17:36] main available for connection on [3:17:37] the right-of-way. [3:17:39] There's a 20 inch water main [3:17:42] located as well. [3:17:44] So again, public utility [3:17:46] services are available to the [3:17:47] property. [3:17:48] On site storm water management, [3:17:51] once the trips are captured on [3:17:55] site, all the maneuvers will be [3:17:58] confined in the property itself. [3:18:00] So I want to run through that. [3:18:01] And I thank you again for the [3:18:02] opportunity to do so. [3:18:05] >> hearing master: thank you. [3:18:08] >> as skbrar my mentioned, the [3:18:09] property is located within the [3:18:10] urban service area. [3:18:13] The comprehensive plan [3:18:14] contemplates growth within the [3:18:15] community. [3:18:18] And this is a prime spot for [3:18:19] that type of growth. [3:18:21] The county's commercial [3:18:25] locational criteria is met by [3:18:27] this location and the proposed [3:18:27] use. [3:18:30] The criteria exists for a [3:18:30] reason. [3:18:33] They identify neighborhoods [3:18:35] where they appropriately serve [3:18:36] residential developments, [3:18:39] without allowing residential [3:18:42] development to migrate within [3:18:47] residential areas, this is on [3:18:52] ehrlich road, which is a large [3:18:52] corridor. [3:18:54] The principle land use concern [3:18:56] that was raised by development [3:18:58] services is compatibility. [3:19:00] Compatibility does not mean that [3:19:03] every adjoining property must be [3:19:05] categorized within the same use. [3:19:07] The question is whether the [3:19:10] proposed development can co [3:19:11] exist without creating [3:19:13] reasonable impacts. [3:19:14] First, this is a planned [3:19:15] development, a planned [3:19:19] development, we are allowed to [3:19:22] work with county staff and the [3:19:24] local area to develop what that [3:19:25] plan means. [3:19:28] We're not asking for a broad [3:19:30] commercial rezoning of this [3:19:31] district. [3:19:33] And the county has the ability [3:19:35] through this process, to control [3:19:36] the use. [3:19:39] The buffering, the lighting, and [3:19:40] other characteristics of the [3:19:45] development itself. [3:19:48] Through time we have submitted [3:19:50] several proposals to county [3:19:53] staff regarding the development. [3:19:55] Through time, we've also reduced [3:19:57] the size of the building, we [3:19:59] revised the circulation pattern, [3:20:01] adjusted the fuel canopy to [3:20:02] better match the surrounding [3:20:05] area as the code dictates, we [3:20:07] modified the storm water [3:20:09] configuration, we eliminated the [3:20:10] pavement behind the building, [3:20:12] which would better serve the [3:20:13] wetlands adjacent to the [3:20:15] property, and developed [3:20:16] additional wetland measures, [3:20:19] such as moving the building [3:20:20] completely out of the wetland [3:20:22] itself P.M. These are meaningful [3:20:22] changes. [3:20:24] The physical context provided -- [3:20:26] the physical context of the [3:20:28] property provides additional [3:20:29] separation to the east is the [3:20:31] county owned property containing [3:20:35] a retention pond which we would [3:20:39] use to extend ehrlich, and we've [3:20:40] been in discussions with public [3:20:43] works, we reached out to public [3:20:47] works to address that extension [3:20:53] into bellamy road. [3:20:55] We have proposed -- our [3:20:56] development includes potential [3:20:58] set backs and landscape buffers [3:21:00] around the property. [3:21:01] Planning commission's own [3:21:09] analysis recognizes the [3:21:10] compatibility of the use. [3:21:12] As planning commission stated, [3:21:13] compatibility does not mean the [3:21:17] same as, so again, compatibility [3:21:19] asks, is this viable with the [3:21:20] surrounding community. [3:21:22] Not is it exactly the same as [3:21:27] the surrounding community. [3:21:29] These recognizable commercial [3:21:33] uses along ehrlich that extend [3:21:34] miles each way, that are listed [3:21:36] as commercial, gas stations [3:21:45] about two miles east of the [3:21:46] properties, for example. [3:21:48] >> hearing master: please, [3:21:49] folks, planning commission's [3:21:51] report, come on, please. [3:21:53] >> given the current development [3:21:56] pattern that consists mainly of [3:22:00] residential uses with distance [3:22:03] from heavy commercial uses, the [3:22:05] proposal is compatible with the [3:22:06] surrounding area and [3:22:07] neighborhood character, and work [3:22:09] to serve the existing [3:22:09] neighborhood. [3:22:12] The request is consistent with [3:22:14] all of future land use [3:22:15] objectives and possibilities [3:22:17] that relates to the [3:22:18] compatibility of the [3:22:19] neighborhood protection. [3:22:20] The planning commission's only [3:22:24] change to make it incompatible [3:22:25] was the fact that the building [3:22:28] would be within the wetland set [3:22:28] back. [3:22:30] All other locational criteria [3:22:31] was considered consistent by the [3:22:44] county. [3:22:46] Bellamy road, there are several [3:22:47] improvements we're willing to [3:22:49] do, which includes the [3:22:51] right-of-way dedication to the [3:22:52] county. [3:22:53] Restricted right in and right [3:22:56] out access as jeremy has [3:22:56] mentioned. [3:22:59] The sidewalk and multipurpose [3:23:00] path construction, [3:23:02] administrative variances for [3:23:06] spacing standards, which we have [3:23:08] requested, which would be 130 [3:23:14] foot spacing variance, along [3:23:14] bellamy road. [3:23:18] We are willing to implement a [3:23:23] concrete separator, and 15 feet [3:23:26] around the property. [3:23:29] Along ehrlich we would have a [3:23:33] right in, right out access. [3:23:35] This is our trip generation [3:23:35] report. [3:23:37] We have our traffic engineer [3:23:39] here, if there's any questions [3:23:47] about the trip generation. [3:23:49] The property is surrounded by [3:23:50] residential properties, which [3:23:51] are mostly to the south, [3:23:53] including some single family [3:23:55] homes directly to the north, the [3:23:56] county retention pond to the [3:23:59] east, an the church that is [3:24:03] located to the west of the [3:24:05] developable area. [3:24:08] Consistency with the greater [3:24:09] carollwood/north dale area. [3:24:09] - [3:24:11] it promotes pedestrians friendly [3:24:12] growth. [3:24:22] And identifies community needs. [3:24:24] Our client also has similar [3:24:25] values. [3:24:26] Community support that they're [3:24:28] willing to implement would be [3:24:33] partnering with local law [3:24:33] enforcement. [3:24:37] we would have the locally owned [3:24:39] franchisee, who is a community [3:24:40] member that would be on site. [3:24:43] We have implemented or we can [3:24:45] implement steps that would [3:24:48] discourage loitering, we have [3:24:50] advanced security measures, and [3:24:52] we have community outreach [3:24:53] programs we're willing to [3:24:53] implement. [3:24:56] There's also concerns about [3:24:57] possible lighting and noise [3:24:58] pollutions from the property, [3:25:01] but the client -- the client is [3:25:05] able to implement hoods [3:25:06] overlighting, that would make it [3:25:08] localized to the property [3:25:08] itself. [3:25:12] And they introduce soft music in [3:25:15] the outside area, which again [3:25:18] would reuce loitering, and also [3:25:22] would be supportive of community [3:25:24] growth. [3:25:25] Comprehensive plan compliance. [3:25:29] I just wanted to briefly touch [3:25:31] on the comprehensive plan and [3:25:34] what objectives -- such as urban [3:25:35] service areas and urban [3:25:39] expansion areas, which are [3:25:40] addressed already within the [3:25:41] community. [3:25:43] The property is in the usa, the [3:25:45] future land use map, identifies [3:25:48] land use categories that [3:25:49] summarize and establish [3:25:52] permitted land uses and maximum [3:25:54] densities and intensities, which [3:25:59] we do not come close to [3:26:00] reaching. [3:26:01] There's two conditions that [3:26:03] we're requesting with this [3:26:04] application. [3:26:06] One is surrounding the wetland [3:26:08] area, which we would request a [3:26:09] variance to the site development [3:26:13] of the property, and we're also [3:26:16] requesting the bellamy road [3:26:17] extension, which again we have [3:26:20] already discussed with -- or [3:26:21] started, implemented the [3:26:25] discussions with public works. [3:26:27] We have a growth pattern [3:26:29] analysis that was done by rvi [3:26:32] that shows consistent growth in [3:26:35] the immediate area and multiple [3:26:36] studies have been done by not [3:26:39] only rvi, but the plan [3:26:43] hillsborough county, which shows [3:26:44] since 2020 [3:26:45] 08 there has been [3:26:52] substantial growth in this area. [3:26:54] The review was consistent with [3:26:56] our request, and did not have [3:26:58] any other requirements for [3:27:04] proposed rezoning for the [3:27:04] property [3:27:05] >> hearing master: how much more [3:27:06] time will you need? [3:27:14] >> I need like 2 more minutes. [3:27:15] >> hearing master: and those [3:27:19] people who want to support can [3:27:22] speak for an additional amount [3:27:22] of time. [3:27:24] 2 more minutes. [3:27:26] >> there are gas stations in [3:27:28] close proximity of churches. [3:27:30] This is several examples of that [3:27:32] which are all located within [3:27:34] hillsborough county. [3:27:34] And the close to the immediate [3:27:40] area. [3:27:41] Again, we're asking for [3:27:42] conditions that would be placed [3:27:44] on the property, which would [3:27:46] include the variance for the [3:27:49] wetland setback, and then also [3:27:52] for the -- all administrative [3:27:55] requirements for the access, the [3:27:56] right in access points for the [3:28:00] property. [3:28:02] We would also, of course, obtain [3:28:05] the required public works and [3:28:29] transportation approvals. [3:28:31] I have nothing further to add. [3:28:31] Thank you. [3:28:32] >> hearing master: okay, thank [3:28:33] you, sir. [3:28:34] At this point in time, [3:28:43] development services staff? [3:28:49] >> good evening, guess [3:28:49] granlinier with development [3:28:53] services. [3:28:59] The proposal includes a one [3:29:00] story commercial building, and [3:29:03] up to 12 fueling stations, with [3:29:10] access from both bellamy and [3:29:11] erhlich road. [3:29:14] A vacant parcel used as a county [3:29:17] storm water pond to the east and [3:29:19] church with associated school [3:29:21] and child care facilities to the [3:29:21] west. [3:29:24] These uses reflect a [3:29:26] predominantly institutional [3:29:29] pattern along the corridor. [3:29:31] Approximately 38% of the site [3:29:33] consists of wetlands in the [3:29:35] northwest portion of the [3:29:35] property. [3:29:38] The limits -- this limits the [3:29:39] available area for development, [3:29:42] and affects building placement, [3:29:43] circulation and storm water [3:29:44] management. [3:29:46] While the applicant has made [3:29:49] adjustments to the site design, [3:29:53] the current layout requires [3:29:54] encroachment into the wetland [3:29:57] buffer, which would require a [3:29:59] separate variance that has not [3:30:00] been obtained. [3:30:02] The site contains wetlands and [3:30:04] other surface water and [3:30:05] conservation set backs. [3:30:10] These areas prohibit filling, [3:30:11] excavation, and impervious [3:30:12] services. [3:30:14] The current layout encrouches [3:30:17] into those required set backs. [3:30:18] A key consideration review, is [3:30:21] the intensity of the proposed [3:30:21] use. [3:30:24] The convenience store with fuel [3:30:29] sales, typically delivers higher [3:30:30] levels of travel. [3:30:32] This represents a substantial [3:30:34] increase compared to the [3:30:38] existing conditions [3:30:38] s [3:30:39] s and [3:30:40] surrounding uses. [3:30:43] This makes it challenging to [3:30:44] fully mitigate transitions [3:30:47] between the proposed development [3:30:49] and adjacent homes and church. [3:30:50] Particularly, where natural [3:30:52] buffers are crrently provided [3:30:54] by wetlands areas. [3:30:55] Also, transportation staff [3:30:56] identified several outstanding [3:30:58] issues, including the need for [3:31:00] additional detail on proposed [3:31:03] access, roadway improvements and [3:31:04] right-of-way dedication. [3:31:06] Some submitted materials were [3:31:08] either incomplete or [3:31:09] inconsistent. [3:31:11] Also, public works indicated [3:31:14] that they could not adequately [3:31:16] evaluate potential use of county [3:31:17] property, with the information [3:31:17] provided. [3:31:20] As a result, transportation [3:31:23] staff recommended a denial. [3:31:25] I would recommend speaking to [3:31:27] transportation after this, [3:31:29] regarding their concerns. [3:31:31] Considering the intensity of the [3:31:33] proposed commercial activity, [3:31:34] the environmental constraints on [3:31:37] the site, and the unrevolved [3:31:42] transportation related issues, [3:31:47] staff finds the request [3:31:47] unsupportable. [3:31:48] I am available for any questions [3:31:49] you MAY have. [3:31:50] And I also have my revised staff [3:31:51] report. [3:31:51] I'm sorry. [3:32:00] >> hearing master: okay. [3:32:01] Folks, please. [3:32:03] I'd like to ask transportation [3:32:07] staff to provide any comments [3:32:09] regarding the application. [3:32:10] >> yes. [3:32:12] Sarah rose is online and will [3:32:14] speak to the objections on [3:32:14] record. [3:32:17] >> hearing master: okay. [3:32:22] >> good afternoon, sarah rose [3:32:27] from transportation review. [3:32:30] As notated in transportation's [3:32:31] rationale for objection as [3:32:34] outlined in our report, the [3:32:36] applicant did submit several [3:32:38] variance requests for their [3:32:41] access on to bellamy. [3:32:44] Namely an administration spacing [3:32:47] variant which was found to [3:32:48] contain sufficient information [3:32:51] for review, by the manager of [3:32:53] transportation review. [3:32:56] In addition to that, an [3:32:56] administrative design exception [3:33:00] was submitted for the [3:33:02] substandard roadway conditions [3:33:03] of bellamy. [3:33:06] That too was found insufficient [3:33:11] for review by the manager of [3:33:13] transportation review. [3:33:16] For both of those variances, one [3:33:18] of the outstanding insufficients [3:33:21] for both of those requests was [3:33:22] the lack of information [3:33:24] regarding the right-of-way [3:33:26] expansion for bellamy. [3:33:27] Neither of the variance request [3:33:30] or the site plan does the [3:33:32] applicant outline exactly how [3:33:36] far or how much width will be [3:33:38] required for that expansion. [3:33:40] As stated by the applicant in [3:33:42] their presentation, the [3:33:44] applicant did inquire whether [3:33:45] staff could condition the [3:33:49] project to be able to continue [3:33:51] without the bellamy access if [3:33:54] the expansion for bellamy was [3:33:56] not in the additional [3:33:58] right-of-way, to be taken from [3:34:00] county land, county property, [3:34:04] which resides east of the [3:34:05] subject area. [3:34:07] Could not be supported by [3:34:08] subject works. [3:34:11] At the time of zoning review. [3:34:14] Public works, no coordination [3:34:16] for public works between the [3:34:18] applicant and public works had [3:34:20] been completed. [3:34:22] and at the time of site [3:34:24] construction, if public works [3:34:27] were not able to support county [3:34:30] land to be taken for that [3:34:33] right-of-way expansion on [3:34:35] bellamy, if the project could be [3:34:37] conditioned in such a way to [3:34:39] proceed without that bellamy [3:34:40] access. [3:34:42] Staff notified the applicant [3:34:45] that this would require a [3:34:46] stantive change to the [3:34:46] application. [3:34:48] Meaning that a revision to the [3:34:50] site access analysis, and the [3:34:51] site plan would be required. [3:34:54] And that as the revised plan [3:34:56] deadline had already passed, [3:34:58] such condition could not be [3:34:59] considered at that late stage in [3:35:01] the review, and there would be [3:35:02] insufficient time for the staff [3:35:04] and the public to fairly and [3:35:07] adequately review and provide [3:35:08] comments on justification that [3:35:11] the proposed use and density [3:35:13] could be adequately supported by [3:35:17] a single right in, right out [3:35:20] connection on ehrlich road. [3:35:26] >> hearing master: anything [3:35:26] else? [3:35:28] >> not at this time. [3:35:28] >> hearing master: okay. [3:35:29] Thank you. [3:35:31] At this point in time, planning [3:35:32] commission staff? [3:35:35] >> lily linehan, planning [3:35:35] commission staff. [3:35:37] The subject property is located [3:35:39] within the residential 4 future [3:35:41] land use category, within the [3:35:44] limits of the greater [3:35:45] carollwood/north dale community [3:35:46] plan. [3:35:49] Given the current pattern of [3:35:51] mainly residential uses, but the [3:35:54] close proximity to a major [3:35:56] highway, the proposal is [3:35:57] compatible and would work to [3:35:59] serve the existing neighborhood [3:36:01] and meets the intent of [3:36:06] objective 4.4 and policy 4.4.1. [3:36:09] The commercial locational [3:36:10] criteria which is established in [3:36:15] flu 4.7 and policy 4.7.2, the [3:36:18] subject site is located within [3:36:22] the 1,000 foot distance of the [3:36:25] required intersection. [3:36:29] The applicable area complies [3:36:32] with the site plan. [3:36:34] The proposed building encroaches [3:36:38] into the required 30 foot [3:36:39] wetland set back. [3:36:42] The current proposal does not [3:36:43] establish compliance or [3:36:45] adequately demonstrate that the [3:36:46] potential impacts to the [3:36:47] environmentally sensitive [3:36:50] resources have been resolved. [3:36:52] The proposed planned development [3:36:56] has not demonstrated consistency [3:36:59] with flu 6.1 and 6.2. [3:37:04] Flu policy 6.1.1, objective 3 [3:37:07] pbt 5 and 3.5.1. [3:37:10] As development services has [3:37:10] communicated, hillsborough [3:37:12] county land development code [3:37:14] section 4.01.07b. [3:37:18] The proposal has not adequately [3:37:20] demonstrated consistency with [3:37:22] the greater carollwood north [3:37:24] dale community plan, [3:37:27] particularly those that address [3:37:28] compatibility with the [3:37:30] established character of the [3:37:31] surrounding community. [3:37:32] Based upon the above [3:37:34] considerations and the following [3:37:38] goals, objectives planning [3:37:41] commission staff finds this [3:37:44] application inconsistent. [3:37:45] >> hearing master: thank you. [3:37:47] Is there anyone in the audience [3:37:49] that wishes to speak in support [3:37:50] of the application? [3:37:52] I see no one responding. [3:37:53] Anyone in the audience wish to [3:37:57] speak in opposition to the [3:37:58] application. [3:38:00] I see quite a few hands raised? [3:38:02] i don't know if you have a [3:38:04] spokesperson for the group or [3:38:05] not. [3:38:09] But otherwise -- I'm sorry, the [3:38:10] gentleman in the front row. [3:38:12] I don't know if you're the [3:38:13] spokesperson or not? [3:38:16] >> I'm the attorney for a [3:38:17] portion -- for the church, which [3:38:18] is a major portion of the people [3:38:21] that are here today. [3:38:23] My name is jonathan bailey, with [3:38:26] the national center for life and [3:38:29] liberty, we represent hillsdale [3:38:30] baptist church and christian [3:38:32] school, one of the neighbors [3:38:32] here. [3:38:36] They want to put an almost 5,000 [3:38:37] square foot convenience store [3:38:42] building, fueling canopy with 12 [3:38:46] fueling stations, and gasoline [3:38:48] and diesel tanks, right in the [3:38:49] middle of a residential [3:38:51] community and right next to a [3:38:52] church and school. [3:38:54] Everything they said around it, [3:38:55] about it being community [3:38:57] friendly. [3:38:58] The impact to these homes, the [3:38:59] people living there, and the [3:39:01] impact to the school is not just [3:39:02] the traffic. [3:39:04] It's a severe danger to the [3:39:05] community that's going to be [3:39:06] there. [3:39:07] The type of people that are [3:39:12] going to hang out at this [3:39:13] 7-eleven at night. [3:39:15] The people that are going to be [3:39:15] coming into this community that [3:39:17] are not part of this community. [3:39:20] This is not a community centric [3:39:22] development plan at all. [3:39:24] The development service [3:39:27] recommendations, not [3:39:27] supportable, transportation [3:39:30] staff objects and recommends [3:39:30] denial. [3:39:31] Everyone that's looked at this [3:39:33] says this is a bad idea. [3:39:35] and it is a bad idea. [3:39:39] The 7-eleven came and talked to [3:39:41] the church and said, what if we [3:39:43] just serve alcohol after 5:00? [3:39:46] That doesn't solve the problem. [3:39:49] We're going to wake up and have [3:39:51] someone passed out at the school [3:39:52] entrance. [3:39:53] Serving after 5:00 doesn't solve [3:39:54] the problem. [3:39:57] To think this is not a wedge [3:39:58] principle, where they're going [3:40:01] to try to get this in the door, [3:40:03] and all of a sudden, we're going [3:40:05] to serve beer at 11:00 A.M., [3:40:06] that's going to happen. [3:40:08] It's going to create a safety [3:40:11] problem at this christian school [3:40:12] that's going to be newsworthy. [3:40:17] It cannot be allowed to happen. [3:40:19] This increases the trips from 28 [3:40:20] trips to 2800. [3:40:22] That's fundamentally changing [3:40:23] this entire area. [3:40:24] This area coming off this road [3:40:26] of veterans is not a highly used [3:40:28] area, the walmart is not [3:40:30] anywhere close, it's way further [3:40:31] than where he was saying. [3:40:33] These restaurants are nowhere [3:40:34] near where the school is at. [3:40:36] This is not the picture he [3:40:37] presented of this little area. [3:40:40] This is a cozy little [3:40:43] residential area, with a church [3:40:44] and -- [3:40:44] >> hearing master: please stop [3:40:46] clapping, and making noises. [3:40:48] >> this is a church and school [3:40:50] area that doesn't have this type [3:40:51] of traffic now. [3:40:53] The environmental concerns are [3:40:55] not to be anywhere overlooked. [3:40:57] You have 38% of the site consist [3:41:00] of wetlands, and approximately [3:41:03] 8700 square foot of wetland [3:41:03] impact. [3:41:05] And 13,000 square feet of [3:41:07] wetland buffer impact. [3:41:11] You're going to put 20,000 [3:41:13] gallon, 12,000 gallon diesel [3:41:15] tanks right next to a wetland [3:41:16] issue, and you're asking for [3:41:21] buffers that do not meet the ldc [3:41:21] criteria. [3:41:23] They need variances they have [3:41:24] not applied for. [3:41:26] This impact is going to be [3:41:27] severe, it's going to place the [3:41:29] children at the school at risk. [3:41:31] It's going to increase traffic, [3:41:33] safety risks, for the area. [3:41:35] Trying to get in and out of the [3:41:37] school, in the mornings with the [3:41:38] traffic is going to be [3:41:39] impossible [3:41:40] impossible. [3:41:40] This is not something that's [3:41:42] doable from a site traffic [3:41:44] perspective, and the way they [3:41:46] propose their traffic plan is [3:41:47] laughable at best. [3:41:48] The neighborhood that is behind [3:41:51] it, are very upset, not because [3:41:57] they don't want a 7-eleven, but [3:41:58] because it's going to destroy [3:41:59] their way of life. [3:42:01] This is not consistent to the [3:42:03] area and to the way this [3:42:04] community has been built and [3:42:07] where it is today. [3:42:11] We'd ask that hillsborough [3:42:14] baptist church and school [3:42:18] request the hearing master deny [3:42:19] this application. [3:42:21] It's incompatible with [3:42:23] surrounding uses. [3:42:25] Unsupportable by the [3:42:27] infrastructure. [3:42:30] And poses safety risks to the [3:42:32] adjacent church and school. [3:42:35] >> hi, sir, can you say your [3:42:37] name for the record? [3:42:40] >> jonathan bailey, 1790 [3:42:41] recognize svelte boulevard. [3:42:47] >> if you can sign in, please, [3:42:48] sir. [3:42:49] >> hearing master: next speaker, [3:42:49] please. [3:42:56] >> I live at 3565 steeplechase [3:42:56] boulevard. [3:42:58] I want to give some quick [3:42:59] background here, that I don't [3:43:01] think I heard tonight. [3:43:05] 17 years ago, the same parcel [3:43:10] was proposed -- two parcels I [3:43:12] guess, was proposed for a [3:43:13] racetrack gas station. [3:43:15] The conclusion at that time, was [3:43:19] based on testimony, evidence, [3:43:21] various planning departments, [3:43:23] and a review of the [3:43:25] comprehensive plan is concluded [3:43:27] that the rezoning is not [3:43:28] compatible with the surrounding [3:43:31] land uses and zoning, and not [3:43:32] consistent with a comprehensive [3:43:33] plan. [3:43:35] Recommendation denial. [3:43:37] Signed by steven lutz. [3:43:43] You're still looking good. [3:43:45] And we're very appreciative that [3:43:46] the significant analysis that [3:43:49] the county staff has done on [3:43:52] this, because this is a project [3:43:57] that I guess -- to put it -- as [3:43:59] succinct as possible. [3:44:00] Bellamy road is the only way in [3:44:01] and out. [3:44:04] The major artery for some 2500 [3:44:04] homes. [3:44:05] If you put this gas station [3:44:07] there with all the extra traffic [3:44:09] they're talking about. [3:44:13] They would significantly lead to [3:44:15] congestion, lead to safety [3:44:16] issues. [3:44:18] Not only for the cars, but a lot [3:44:21] of people walk and ride their [3:44:22] bicycles past that intersection, [3:44:23] because there's a very -- I [3:44:25] can't think of the name of it, [3:44:26] there's a trail north/south [3:44:28] that's to the west of there. [3:44:30] That a lot of people use -- a [3:44:32] lot of people ride their bikes [3:44:36] on, and so it's just -- I can't [3:44:37] even imagine people coming off [3:44:41] the veterans, doing u-turns at [3:44:41] that intersection. [3:44:43] and another thing that's not [3:44:45] mentioned here, I guess I would [3:44:46] say there's a flaw in how the [3:44:49] county evaluates traffic. [3:44:53] There are a lot of speeding cars [3:44:57] on ehrlich, I don't know if [3:44:58] they're trying to beat that [3:45:00] light or get to veterans, for [3:45:01] whatever reason. [3:45:03] It's not a matter of traffic [3:45:05] counts, which will go way up if [3:45:07] the station is put in there. [3:45:09] There has to be some way, with [3:45:10] current technology, the measure [3:45:12] of the cars that go by that [3:45:14] intersection on a daily basis. [3:45:16] How many are exceeding the speed [3:45:18] limit by 10 miles or more. [3:45:20] I can only say that -- [3:45:22] especially if the plan is [3:45:25] redrawn and bellamy is [3:45:29] eliminated, that would create a [3:45:32] hazard of unforgivable epic [3:45:33] proportions, because people [3:45:35] would pull out, speeding, you're [3:45:36] asking for a lot of MAY hem. [3:45:39] And I think it would be not [3:45:39] good. [3:45:43] I wish the county would evaluate [3:45:45] its traffic count process to [3:45:47] also include some measure using [3:45:49] lasers or whatever is available [3:45:50] with the current tech, to note [3:45:52] the speeders on a given road in [3:46:01] this case, it's ehrlich. [3:46:03] There's not just the wetlands [3:46:05] behind the proposed station, and [3:46:08] there's a retention pond across [3:46:09] bellamy. [3:46:10] There's also another pond not [3:46:13] indicated on the maps, that [3:46:15] shows another small pond behind [3:46:16] a home that's directly off the [3:46:17] intersection there. [3:46:18] It's another pond that's [3:46:22] potentially impacted by the [3:46:23] spillage from gas and oil, [3:46:25] whatever you can buy to put in [3:46:30] your car, that's toxic. [3:46:34] So we -- again, to summarize, [3:46:37] this is the only main road in -- [3:46:40] this is how we -- see the real [3:46:40] world. [3:46:42] And if you put all that extra [3:46:43] traffic there, it creates a [3:46:46] safety hazard, a traffic hazard, [3:46:48] a congestion hazard. [3:46:51] It could endanger children, [3:46:52] bikers, pedestrians, who use [3:46:53] that intersection all the time. [3:46:55] I've lived there for 25 years, I [3:46:57] can't give you a precise count, [3:46:59] but every time I drive there, [3:47:00] there's someone trying to cross [3:47:01] that street. [3:47:03] I thank you for listening. [3:47:04] >> hearing master: thank you, [3:47:05] sir. [3:47:06] The next speaker, please. [3:47:07] >> if you could please sign in, [3:47:11] sir. [3:47:13] >> we do also have two people [3:47:15] online that wsh to speak. [3:47:16] >> hearing master: okay. [3:47:21] >> richard alexander, 6516 [3:47:22] spring oak cort. [3:47:28] I want to be quick, there's a [3:47:30] lot of passion on this issue. [3:47:31] This is a very simple battle. [3:47:36] This is a battle of [3:47:37] unquenchable, insatiable greed [3:47:40] versus families. [3:47:41] That's what this is about. [3:47:42] This is about a corporation that [3:47:44] couldn't care less about [3:47:46] husbands, wives, fathers, [3:47:47] mothers, elementary, middle and [3:47:49] high schoolkids. [3:47:50] Because within a stone's throw [3:47:56] of bellamy and ehrlich is not [3:48:01] only a church, but there's an [3:48:04] elementary -- pre-k, elementary, [3:48:07] middle and high school. [3:48:13] There's one south and north [3:48:14] bellamy. [3:48:16] It's a very busy intersection. [3:48:17] There's residences to the east [3:48:18] of that location. [3:48:20] What's west of the location? [3:48:22] Is the church, the preschool, [3:48:23] the middle school and elementary [3:48:24] school. [3:48:26] This is going to be a disaster. [3:48:28] This is a stick of dynamite with [3:48:30] a very short fuse. [3:48:32] Because you have buses, you have [3:48:34] people, you have couples young [3:48:36] and old walking hand in hand on [3:48:37] that sidewalk. [3:48:42] Which is going to go away, [3:48:44] 7-eleven is open 24 hours, seven [3:48:47] days a week. [3:48:50] Selling alcohol, beer, wine, [3:48:52] vaping products, cigarettes. [3:48:54] That's not going to be limited [3:48:56] to inside that store. [3:48:56] Guarantee it. [3:48:58] This is not an isolated event. [3:48:59] Thank you for your time. [3:49:01] >> hearing master: thank you. [3:49:04] Next speaker, please. [3:49:05] Good evening. [3:49:09] >> hi, I am penelope jacobs. [3:49:13] I live at 630 # 3 nesting court. [3:49:16] I want to add on to a few points [3:49:17] I heard. [3:49:21] With the hillsdale baptist [3:49:22] church, there's a field where [3:49:24] kids play all assorts of games, [3:49:26] the only thing protecting from [3:49:28] this lot to that church is a [3:49:32] bunch o trees, I imagine those [3:49:33] would be torn down. [3:49:35] So it would leave the children [3:49:36] there exposed to alcohol [3:49:39] products and smoking, gambling, [3:49:41] all that kind of stuff. [3:49:45] And on top of that, the [3:49:46] intersection is already over [3:49:46] crowded. [3:49:49] I live back there, I g to a [3:49:52] school down ehrlich road. [3:49:56] I wake up at 6:45 to get to a [3:50:02] school a live 5 minutes away [3:50:06] from. [3:50:07] Squeezing gas tanker trucks into [3:50:09] a tight opening could cause a [3:50:10] lot of traffic. [3:50:11] Yeah, that's all. [3:50:12] >> hearing master: okay. [3:50:13] very good, thank you. [3:50:16] Please sign in. [3:50:18] Next person, there's somebody on [3:50:23] the left that's trying to come [3:50:23] forward. [3:50:24] Good evening. [3:50:32] >> hello, ginger wilson. [3:50:33] 105cragy cliff street. [3:50:36] I live off of bellamy road for [3:50:37] about 27 years. [3:50:38] I moved on the outskirts of town [3:50:42] when I moved here, relocated [3:50:43] with my company. [3:50:45] I did not move downtown into the [3:50:47] city because I wanted to live on [3:50:50] the outskirts of town, because I [3:50:54] enjoy the wildlife in florida. [3:50:55] It's amazing. [3:50:58] And we have a nice quiet [3:50:59] community where there's tons of [3:51:01] animals, egrets, rose bills are [3:51:03] all in that big retention pond [3:51:08] next to us. [3:51:10] They're all around. [3:51:13] Sand hill cranes. [3:51:15] They deserve to have their space [3:51:15] to live. [3:51:17] The development has continued to [3:51:18] move things. [3:51:19] The traffic as other people, I'm [3:51:22] going to shorten up what I had [3:51:22] written. [3:51:24] The traffic situation is dire. [3:51:26] And whoever did that traffic [3:51:29] study, did not do it well [3:51:32] because if you live there, you [3:51:35] know, I've sign a person killed [3:51:37] on a bike at that intersection, [3:51:38] hit by a car. [3:51:40] Every day, you pull out, there's [3:51:43] more garbage in the street, [3:51:44] where there's been another [3:51:45] collision. [3:51:48] Cars back up, all the way past [3:51:49] MR. John's house. [3:51:51] Every morning, trying to make a [3:51:53] right turn out, or to make a [3:51:58] left turn out to go east on [3:51:59] ehrlich. [3:52:00] There's gas stations all around [3:52:02] us, in 27 years I've never run [3:52:03] out of gas. [3:52:05] Even in milton, because there's [3:52:06] plenty of gas stations around [3:52:07] me. [3:52:10] Every direction I can go when I [3:52:13] leave my home, has a gas [3:52:14] station. [3:52:17] There's not a gas station needed [3:52:17] there. [3:52:21] Not to mention, gas tanks [3:52:22] underground, do have [3:52:23] contamination. [3:52:26] And there's animals and wildlife [3:52:28] living out their lives. [3:52:30] It's wrong, we don't need it in [3:52:37] our neighborhood, we don't want [3:52:37] it. [3:52:38] The biggest thing, where the [3:52:40] church is, there's a cross-over. [3:52:42] People are trying to come out of [3:52:43] that church, turning left or [3:52:52] right. [3:52:56] On tom fuller, they built an [3:52:58] apartment complex, people are [3:52:59] turning out of tom fuller, turn [3:53:01] down there, and cut through, [3:53:03] make a u-turn at the church or [3:53:06] come down to bellamy and ehrlich [3:53:10] and make a u-turn there. [3:53:14] The traffic is already horrible. [3:53:18] I've seen people bumper to [3:53:19] bumper, four thick. [3:53:22] You put a 7-eleven there, and [3:53:23] try to make that another [3:53:26] cross-over, you have created [3:53:27] another huge traffic jam. [3:53:30] And blocking us from leaving our [3:53:31] neighborhood every morning. [3:53:33] It's wrong, we don't want it. [3:53:35] I'm sorry that the people that [3:53:36] live in the corner have been [3:53:38] unable to sell their house, [3:53:40] because it's been for sale for [3:53:42] pretty much the 27 years I've [3:53:43] lived there. [3:53:45] They haven't been able to sell [3:53:45] it, I'm sorry. [3:53:48] Sell it, figure it out. [3:53:49] There's a house across the [3:53:51] street from them that was vacant [3:53:52] many, many years. [3:53:54] Someone's finally there, and a [3:53:55] gas station is not consistent [3:53:56] with that neighborhood right [3:53:56] there. [3:53:58] It just isn't. [3:53:59] >> hearing master: all right. [3:54:00] Thank you, ma'am. [3:54:06] >> thank you. [3:54:07] >> hearing master: good evening. [3:54:13] Claudia cappiello, I live at [3:54:23] 14949 barbie avenue. [3:54:25] >> hearing master: for the [3:54:28] record, I gave the applicant 2 [3:54:33] extra minutes, I'll give the [3:54:35] speakers 2 extra minutes. [3:54:38] >> I am in opposition of this [3:54:38] development. [3:54:41] They have 870 signatures to this [3:54:42] petition. [3:54:44] Back in MARCH, when they were [3:54:46] trying to do a standard [3:54:48] rezoning, I had over 700 people [3:54:49] sign that petition. [3:54:51] The changes that these people [3:54:54] have put forth with this new [3:54:55] application doesn't address the [3:54:57] concerns of the community. [3:54:59] And they're definitely not in [3:54:59] support of having this [3:55:01] development. [3:55:02] >> hearing master: thank you, [3:55:02] ma'am. [3:55:04] There's a couple people online [3:55:05] that wanted to speak, let's hear [3:55:07] from them. [3:55:09] Go ahead. [3:55:12] >> jennifer? [3:55:15] >> hi, good evening. [3:55:17] My name is jennifer anderson, I [3:55:23] have resided at 1472 red cliff [3:55:24] drive for 16 years. [3:55:26] Off of bellamy road, we have [3:55:28] thousands of homes in addition [3:55:31] to those 9hoa communities. [3:55:33] Living in our residential area, [3:55:36] we have access to large lots, [3:55:39] property to house farm animals. [3:55:41] Our rural neighborhood is quiet, [3:55:42] safe and relatively low traffic [3:55:46] when it comes to just [3:55:48] automobiles and our residents [3:55:50] that travel to and from work. [3:55:53] We don't have any commercial [3:55:54] traffic that comes on bellamy, [3:55:57] as we don't have those outlets [3:55:58] to turn around in. [3:56:01] At rush hour, traffic increases [3:56:07] on ehrlich road, it can be [3:56:09] backed up from farmington [3:56:10] boulevard, to lynn turner road, [3:56:12] taking an additional 15 minutes [3:56:14] to travel just one mile. [3:56:17] You will find students riding [3:56:20] their bikes to and from school. [3:56:22] Residents walking between a mile [3:56:25] to one and a half miles to one [3:56:26] of our two public stores and [3:56:28] shopping plazas. [3:56:31] The cyclists and even the [3:56:33] occasional shetland pony and [3:56:33] buggy. [3:56:36] The proposed location is [3:56:37] dangerous to the potential [3:56:39] customers conducting illegal [3:56:41] traffic maneuvers, such as u [3:56:44] hifr turning at the traffic [3:56:44] light. [3:56:47] Traffic entering and exiting the [3:56:49] veteran's expressway -- [3:56:50] >> hearing master: ma'am, I need [3:56:50] you to wrap up your comments, [3:56:56] please. [3:56:58] >> the proposed site should nt [3:57:00] be approved, there are many [3:57:02] environmental concerns, across [3:57:08] the street of 14702 bellamy [3:57:11] road, there's a sign that states [3:57:14] wildlife entering highway. [3:57:17] This would be better used as a [3:57:18] residential home. [3:57:21] The 38% area that is wetland, [3:57:22] it's already been mentioned. [3:57:24] We have many of the animals that [3:57:26] have already been discussed that [3:57:30] are at risk of dying or being [3:57:37] displaced. [3:57:37] Hillsdale -- [3:57:38] >> hearing master: ma'am, can [3:57:40] you wrap up your comments, [3:57:40] please? [3:57:42] >> it's wrapped. [3:57:42] >> hearing master: I think [3:57:45] there's one more gentleman on [3:57:49] line, and that will cone [3:57:49] included [3:57:50] -- [3:57:50] conclude the opposition [3:57:51] testimony. [3:57:52] >> hello. [3:57:52] >> hearing master: go ahead, [3:57:54] sir. [3:57:54] >> hello? [3:57:55] >> can you hear me? [3:57:56] >> yes. [3:58:01] >> okay. [3:58:05] My name is john parachini. [3:58:07] I live on bellamy road for over [3:58:14] 40 years, I came to make [3:58:15] comments tonight. [3:58:19] I can cut them short, after [3:58:23] listening to MR. Bailey from the [3:58:25] hillsborough baptist church, he [3:58:28] detailed quite a number of [3:58:33] objections, very viable [3:58:35] objections to this reapplication [3:58:35] or rezoning. [3:58:38] I would like to make a couple [3:58:40] points specific to my own [3:58:45] property, relative to specific [3:58:48] changes to bellamy road. [3:58:49] They are wetlands, water and [3:58:50] flooding. [3:58:53] The water in the wetlands [3:58:56] resides on 14702 bellamy. [3:58:58] It doesn't sit on my property at [3:58:58] all. [3:59:00] The only occasion where it does [3:59:03] in fact come on to my property [3:59:05] now is during the confluence of [3:59:08] storms, tropical storms, [3:59:09] hurricanes. [3:59:11] Thunderstorms, and my back [3:59:14] property now will flood. [3:59:15] Historically, excess water from [3:59:19] the wetlands moves to the west. [3:59:22] That all changed when the church [3:59:24] came in and the western edge of [3:59:27] the wetlands was fortified. [3:59:29] now, any excess water from the [3:59:31] wetlands escaping there comes [3:59:33] north on to my property [3:59:33] directly. [3:59:37] As a consequence, you cannot [3:59:40] allow for any setbacks, any [3:59:43] variances, any reduction in the [3:59:45] capacity of the wetlands to hold [3:59:45] water. [3:59:48] You can't do it, you will flood [3:59:49] my property without question, [3:59:50] with greater frequency. [3:59:54] This is a lived experience. [3:59:55] This is not conjecture. [3:59:57] Am I out of time? [3:59:57] >> hearing master: yes, thank [3:59:58] you, sir. [4:00:00] Appreciate it. [4:00:01] >> thank you very much. [4:00:02] >> hearing master: thank you, [4:00:02] sir. [4:00:05] There are a couple people that [4:00:06] stood up. [4:00:08] Time has expired, if you'd like [4:00:09] to put your name and address on [4:00:11] the record, so you can speak at [4:00:13] a later hearing, if that's your [4:00:14] desire, can you come forward and [4:00:17] do that. [4:00:18] Otherwise, I'll close opposition [4:00:22] testimony at this point in time. [4:00:23] Is there anyone that wants to [4:00:24] put their name and address on [4:00:24] the record. [4:00:26] Okay. [4:00:30] With that, that concludes the [4:00:31] opposition and development [4:00:34] services, any further comments. [4:00:35] >> no, sir. [4:00:36] >> hearing master: okay. [4:00:38] The applicant has the [4:00:41] opportunity for rebuttal. [4:00:42] You have five minutes for [4:00:45] rebuttal. [4:00:49] I'll give you two extra minutes, [4:00:50] given the time to the [4:00:51] opposition. [4:00:52] >> thank you, I'll keep it [4:00:54] within my five. [4:00:55] We understand there are several [4:00:57] technical approvals that still [4:00:59] need to occur on this property. [4:01:01] The -- this includes the design [4:01:02] exceptions that we mentioned [4:01:04] regarding the wetland and also [4:01:06] the bellamy road extensions. [4:01:08] This is not the time or place [4:01:12] for those to be the forefront of [4:01:12] discussion. [4:01:14] We have opportunities to develop [4:01:16] the site, the site development [4:01:20] process itself. [4:01:24] The rezoning to the planned [4:01:25] development, has these [4:01:28] discussions as part of what [4:01:30] we're trying t prove. [4:01:32] We have talked to staff. [4:01:36] Staff has reviewed the rezoning [4:01:37] application and site plan we [4:01:40] submitted for the rezoning, [4:01:54] which we have here which does [4:01:55] not consider all development [4:01:57] standards for a final site plan [4:01:58] approval. [4:02:00] And we understand that. [4:02:02] There has been comments [4:02:04] regarding the sidewalk going [4:02:05] away. [4:02:06] We are extending the sidewalk, [4:02:08] we are making it a 10-foot [4:02:09] sidewalk on the property. [4:02:11] Which would be supportive of [4:02:16] pedestrians pathways and bike [4:02:16] movement and pedestrians [4:02:17] movement across the property, [4:02:18] through the property and along [4:02:21] the property. [4:02:23] There was inconsistent [4:02:25] statements regarding bellamy [4:02:28] being a main road or an arterial [4:02:30] road or a small road that can't [4:02:34] support any sort of movement. [4:02:37] But our traffic study has shown [4:02:39] that one, there's a pass by rate [4:02:43] of 75%, and also through our [4:02:46] study, there are adequate trips [4:02:49] that would be supported by [4:03:10] bellamy and ehrlich. [4:03:12] Again, there's an important [4:03:13] distinction between approving a [4:03:14] land use and the development of [4:03:15] the property. [4:03:17] Approval of the pd, does not [4:03:20] give the applicant a building [4:03:20] permit. [4:03:23] It does not approve the bellamy [4:03:24] road design exception. [4:03:25] We understand those things need [4:03:27] to be discussed with the county. [4:03:29] And we're willing to implement [4:03:32] any sort of conditions the [4:03:32] county is willing to put on this [4:03:43] property. [4:03:46] >> good evening, michael razor [4:03:48] for the record, bruce b. Downs [4:03:52] boulevard, tampa, florida. [4:03:55] I'm the traffic consultant for [4:03:55] the project. [4:03:58] As -- I'll just continue -- this [4:04:00] is the very rudest hearing I've [4:04:01] ever attended. [4:04:03] And I've been doing this for 30 [4:04:05] plus years. [4:04:10] The great majority of traffic [4:04:11] generated by this site is [4:04:14] already back on the road, it [4:04:15] turns into the site and out of [4:04:17] the site. [4:04:19] It's not a dissension, it's a [4:04:20] convenience store. [4:04:23] We have two right in, right out [4:04:24] driveways proposed. [4:04:27] The major discussion regarding [4:04:29] right-of-way on the eastside of [4:04:33] bellamy is proposing to put in a [4:04:34] four-foot concrete separator to [4:04:37] prevent left turns at that [4:04:38] bellamy driveway. [4:04:39] That will improve not only the [4:04:42] safety of bellamy in this [4:04:43] particular area, by separating [4:04:45] opposing lanes of traffic. [4:04:48] But part of that separator will [4:04:50] extend the southbound left turn [4:04:52] lane, which is currently [4:04:52] deficient. [4:04:54] That's why we hear about issues [4:04:55] with this particular [4:04:56] intersection. [4:04:57] The turn lanes are not long [4:04:58] enough, in the existing state. [4:05:03] If this gets approved, there [4:05:04] will be material improvements [4:05:07] that will not only cure existing [4:05:08] deficiencies, but will also [4:05:10] accommodate the particular site. [4:05:12] At the intersection now during [4:05:14] peak hours as identified in the [4:05:15] morning, to be at level service [4:05:16] c and b. [4:05:19] In the afternoon, that's with or [4:05:21] without this station being [4:05:21] developed. [4:05:26] The only level service in the [4:05:28] report is level c, compared to a [4:05:28] d standard. [4:05:30] And I will conclude by saying [4:05:34] that u-turns are not illegal [4:05:36] movements, they are permissible [4:05:38] as long as there's not a sign [4:05:38] restricting those. [4:05:41] I would be happy to answer any [4:05:42] specific traffic questions you [4:05:47] MAY have. [4:05:48] >> hearing master: does that [4:05:50] conclude your presentation on [4:05:50] your rebuttal? [4:05:51] >> it does, thank you for your [4:05:53] time. [4:05:54] >> hearing master: with that, [4:05:55] this concludes this application. [4:05:57] And that concludes tonight's [4:05:59] zoning hearing master hearing.