[0:14] And let's move on to approval of meeting minutes as everyone on the board had a chance to [0:22] take a quick look at the meeting minutes. Yes. [0:23] any questions? >> okay. So on the emotion motion to [0:29] approve a second. All those in favor say any opposed? [0:33] all right. Motion passes. Moving on to street names. [0:41] >> we have everything today. Yep. In the car. [0:42] my postal district in 29526 in pencil point we have scudder drive branch street, sprague [0:49] way and outer street in piper. So district two now about two seven and inglewood phases one [0:56] and two we have burbridge drive garcia loop lish street mare drive and we're circle in [1:04] aigner galvin's very postal district 29544 and 29511 in hutch track we have deer meadow [1:11] way white deer ridge road, white ridge drive and wildflower ville caught in the [1:19] law supposed to district 29569 and sell the towns we have tommy b loop okay no public [1:29] input required can anyone make a motion to approve motion to approve a second second. [1:34] >> all those in favor? >> any opposed? All right. [1:40] motion carries moving on to rezonings first on the list development agreement. [1:44] >> so this development agreement coincides with the rezoning request how I on a [1:52] farm and I'll very I'm going to run through them together if you want to but we need to do [1:56] public input on the development frame after I get through it. >> yeah. [2:00] so the development agreement proposes a max unit count of 372 single family homes with [2:07] a minimum lot size of 7000ft in a maximum building height of 40ft. [2:11] the development agreement also commits to naturally force or program buffers varying and [2:18] width from 100 foot to 200 foot. They are donating 1.21 acres [2:21] of land for expansion of the existing fire station their proposed walking trails their [2:25] plan to relocate existing unimproved roadway to maintain access to the adjacent property [2:32] they're proposing no lots in the floodplain and they're proposing a list of offsite [2:37] road improvements including a left and right turn lane on. None of have a left lane a left [2:44] turn lane on this very road a right turn lane on highway not a52 over east ferry and a [2:47] traffic signal at the intersection of highway none of have an already ferry there [2:52] plan to reserve 25 foot a right of way for the widening of highway none of the [2:57] commercial developers also committed to install on a right turn lane on and off and [3:02] contributing $200,000 to the cost of the traffic signal and they're also planning to [3:07] reserve 25 foot around way for the widening of highway none of and they're also proposing a [3:11] $5,800 fee per lot to horry county you want me to go through the rezoning to now [3:19] what would you prefer that's for joe baskins requesting to rezone 186.84 acre portion from [3:25] f to m p for 372 town our single family homes on highway 95 and always ferry existing [3:32] zone in the areas predominately f I with some residential and some commercial zoning future [3:40] land use designation and see it in conservation and rural communities so it's currently [3:44] vacant. So here's the plan showing the 372 single family units with [3:51] the gross density of 1.99 dwelling units an acre and a net density of 2.31 dwelling [3:56] units maker the plan proposes three sustainable development criteria sidewalks 100% [4:02] increase in that of open space and eight pocket parks also being proposed is a 200 foot [4:07] naturally forested streetscape buffer along highway 95 and always very road 100 foot and [4:10] actually force a buffers around the perimeter of the project six foot wide walking trails [4:14] access to the existing private road and a list of traffic improvements specified in the [4:21] dia and traffic study. >> here's the key wetland delineation the proposed 9.07 [4:29] acres of will on impact the property is in the supplemental 584 zones on the rear public [4:39] notice map and if you set conditions one is the applicant here today. [4:47] thank you sir. As usual, grossman did a great job of summarizing both the [4:55] development agreement and the rezoning but it wasn't obvious and he had a large hand in the [4:59] development agreement because all the traffic improvements are included there. [5:03] we're at the same density as actually you'd be at it if I because of the half half acre [5:07] lots. However they're compressed as you've seen in other imhotep's [5:11] to create those buffers around the project. It's not a complicated project [5:14] fairly simple I think the the traffic out there justifies the traffic improvements including [5:21] the traffic light. So thank you very much. >> thank you. [5:26] any questions? He needs to put his name on the record. [5:27] oh please put your name out there. I've gotten 46 of bob oleander [5:33] drive in myrtle beach. >> thank you. Okay, now I'm going to open to [5:37] public input. You should do three, four, three against anybody want to [5:40] speak on behalf of this project and I'm I've got a couple of state [5:56] o'leary's ferry I have a question on the. I know you can answer on the [6:01] first page of the agreement and then add on implies that pin number for that 4.1 acre one [6:05] eight acres of the property for a commercial development wants to develop in number nine [6:10] of the agreement. It says a county has agreed to a contribution of $200,000 [6:14] towards the installation of a traffic signal at the intersection at highway 95 and [6:17] o'leary's ferry road. It's unclear from the documents if upon county council vote to [6:21] approve this rezoning and signatures for the development agreement that the 4.18 acre [6:28] property that is zoned faa is guaranteed to be reserved for commercial use for the [6:33] developer. I'm not saying it is I'm saying it's unclear. [6:37] if that's true then I believe it should be presented or we county residents as such [6:41] including what the commercial use will be in order for our community to have complete [6:45] information to form an opinion on the rezoning presented to us. [6:48] >> thank you. Thank you. Anybody else? [6:56] okay. Close public input. I do want to bring up to you [7:01] you know, I think that santa so he he can clarify his opinion is different than mine but the [7:08] commercial developer was included in this day solely for the purpose of the contribution [7:15] towards the light and the reservation of the right away. They're not guaranteed any [7:18] rezoning by way of the development agreement itself. >> thank you. [7:23] I just wanted to add the use that the commercial developer was proposing is allowed in the [7:27] current zoning allowed him to I don't have to rezone. >> okay. [7:32] thank you. All right. We'll move on to the second. [7:37] we have c ranch at circle [7:47] . >> so they're requesting a feature land use map amendment [7:52] with this one I'm going to run through them together. Map is requesting to amend the [7:55] future land use designation from suburban to mixed use now because request murray's on [8:03] 1.23 acres from how a commercial to m r b three 413 for example townhomes on ranch [8:07] it's our home for all drive in myrtle beach the existing zoning the area is [8:11] predominantly commercial with some residential to the north feature land use designation is [8:18] suburban and commercial corridors so it's currently vacant. [8:21] here's the plan on the 13 b simple townhomes with a gross density of 10.57 dwelling units [8:29] and your plan proposes to sustainable development criteria sidewalks and a 1200 [8:33] square foot community garden. The plan also proposes a 25 foot top c streetscape for a [8:38] long range circle a ten foot taxi streetscape along four wheel drive and a five foot top [8:44] b buffer on the remaining side and rear of the property. It's not within a flood zone. [8:48] poet notice map and a few site conditions. All right, great. [8:55] the applicant here today your name and address for the record caitlin weber with g three [9:03] engineering and polly's island. >> grayson did a great job of presenting. [9:06] I'm just here to see if anyone has any questions about the project. [9:07] it's really well explained. >> all right. Any questions for the [9:14] applicant? One question I had you want to get answered is the changing [9:18] the classification to mixed use what's what's the trigger of that versus leaving it as is [9:25] and put in the residential and is that not allowed? >> and so the proposed density [9:28] would exceed what's allowed for the suburban designation which is 3 to 7 and they're proposing [9:34] 10.57. So mixed use is more appropriate designation given [9:39] for that density project. >> okay. Thank you. [9:42] all right. Thank you. You got it. [9:45] okay. This time open public input. Anybody want to speak for or [9:50] against or questions? Okay, I'll close public input. Moving right along we'll go to [9:56] number nine sophie grayson napkins requested a petroleum use map amendment as well. [10:07] they're requesting to amend the classification from rural to rural communities. [10:15] I'm going to run through them together at this request and a reason to point four acres from [10:19] lfa to image. So 14.5 to subdivide for five single family homes the [10:25] existing zoning in the areas bramley lfa with some seven in close proximity to trina's [10:29] designations rural and rural communities. So it's currently residential. [10:35] here's the plat showing the proposed subdivision into five lots. [10:39] it's not within a flood zone public notice map and a few seconds. [10:47] >> all right, thanks. Grayson is the commuter name and for the record please just [10:54] yield 315 main street. >> grayson thanks. Your presentation is here to [10:59] answer some questions. I'm getting any. Anybody have any questions for [11:02] the applicant? Okay. All right. [11:05] thank you. All right. Next up 001 napkins requesting [11:15] a freeze on 3.4 acres from cfa to three for for commercial uses on highway nine and loans. [11:21] this request is within the highway 57 resolution area existing existence on the areas [11:27] predominantly pd with commercial along the nine corridor between these [11:30] designations suburban sites currently vacant. Here's the proposed [11:37] reconfiguration that they're looking to do to the properties as the reason they're rezoning [11:41] it because they can't reconfigure it with different zoning classifications ones [11:46] asking for one cfa not within a flood zone public notice map and a few site conditions that [11:56] all right see I'm here today shep guyton again 46 of rb oleander drive this is very [12:04] similar to the project I had with you a couple of months ago where we had combined parcels [12:10] of different zoning districts in order to create what will be a commercial convenience center [12:15] layer. We have to consolidate that zoning under one use part [12:19] of it's already already four so the request is to make the balance of it already for [12:23] understanding that does fall in the highway 57 overlay which makes staff support difficult [12:27] but we understand that. Okay. Thank you. [12:31] any any questions for the outcome? All right. [12:34] thank you. Thank you all right. >> moving right along 003 oh [12:42] afghans request an arizona three acre portion from f eight as a 42 combined property on [12:46] donor salt road and garment's very existence on the area is predominantly ffa with some as [12:53] a 40 jason petro and designation as rural site is currently vacant. [12:59] here's the proposed plat it's not within a flood zone public notice map and few site [13:08] conditions and q is the applicant to that ashley cowan diamond shores and grace and [13:18] pretty much explain the whole thing. It's a minor subdivision on the [13:23] bottom they're selling to the property owner slightly north from here to combine with the [13:29] sod farm that's existing as a $40. >> happy to answer any [13:33] questions any questions for the applicant. All right. [13:36] thanks for coming. See you next week. All right. [13:40] moving right along 004 the applicant request nouri's own 5.68 acres from highway, [13:46] commercial and emissive to ag three for commercial center on how I favor one and both circle [13:53] and carmi existing zoning areas predominately ffa and cfa with some residential adjacent [14:00] future land use designations rural communities so it's currently residential it's not [14:05] within a flood zone notice map and a few site conditions. >> all right thanks. [14:15] how can I actually karen diamond shores could you put me back in the area this perfect I [14:25] just want to point out a couple of things. This site slightly north at 501 [14:32] is farm bureau insurance so it's also highway commercial. I'm just pointing out some [14:37] other commercial uses. This site right here is actually a furniture store even [14:43] though it is sfr myself 20 it's also a commercial use slightly down the road here you also [14:51] have the flooring connection and ag three zoning district and you also have professional [14:58] roofing which is the rv for slightly down the road and right here you have an ag to [15:03] zoning use. >> you don't have the site plan in front of you but it has been [15:09] submitted for a commercial sketch plan review. I'd be happy to bring that with [15:13] me at the next meeting or maybe staff can include it in the slideshow for you but the [15:17] entire northern portion of the site is actually wetlands so when we come in with the with [15:25] the site plan you'll see that this portion right here is the only portion that's going to be [15:29] used for development. I think we've got 16 units for the trade shop with associated [15:36] parking and then pond and wetlands up here. So it's not going to be [15:41] completely filled with with trade shop and I would be happy to answer any questions that [15:48] you have. >> all right. Thank you. [15:49] any questions? >> all right. Thank you. [15:55] okay. On to the next one, grayson 005 napkins request trees on one [16:02] acre from cfa 2 or 3 for quick service restaurant oh, how am I? [16:06] 544 and comma existing zoning in the areas predominantly cfa with a mix of residential and [16:10] commercial along how I 544 peachtree land use designation suburban that's currently [16:17] vacant. Here's the site plan showing the proposed use it's not [16:24] within a flood zone notice map and a few site conditions. >> okay the argument from thank [16:31] you grace and excellent job and thanks for putting the site plan up for me. [16:38] I think it's noted in the staff review that this is a use that can existing we happen on the [16:43] cfa zoning. What the applicant is trying to do is make sure that they can [16:47] get in this double loaded parking as is right now with the current zoning this would [16:54] have to be parallel parking which doesn't meet the parking requirements of the fast food [16:58] chain that they're trying to put in. As you know if you've been down [17:02] this section of 544, there's also a waffle house two parcels up. [17:07] >> oh, perfect. Thank you. Oh, that's good waffle house [17:14] right here a bojangles just a little bit further down and you've also got a mcdonald's [17:18] and a dunkin. Those are the only eating establishments until you get to [17:23] the food lion or a little further up near the university where they've got some of the [17:28] other eating, I'm happy to answer any questions or any questions for the applicant. [17:35] all right. Thank you. All right, chris and 006 [17:41] applicants requesting a reason 3.57 acres from faa to ag to for boat and rv storage on [17:49] spring beauty drive and conway existence on the area is predominately for with some [17:53] served in an emergency one and closed proximity feature land use designations rural sites [17:59] currently vacant is not within flood zone notice map conditions okay and as the [18:07] applicant here today [18:13] the name and address of the record please henrietta 1017 third [18:19] avenue. >> thank you. Anything on that? [18:22] no. Sure. I'm just here if we got any [18:24] questions. Got any questions? Okay. [18:26] any questions on this one for the applicant. Appreciate it. [18:29] see you next week. Thank you. All right. [18:33] moving right along 007 after applicants requesting a reason 23.26 acre portion from cfa to [18:42] ari four for commercial uses on sam ridge road and bartell road off providence parkway in [18:47] little river existence on the area is cfa and some residential may 7th and six [18:57] withdrawing his designations mixed use the site is currently vacant. [19:04] >> the parcel is within the right away acquisition area for a right for project at robert [19:08] ridge parkway and sam ridge road connector. It's not within a flood zone [19:16] public notice map and a few site conditions. All right. [19:21] thank you. Grayson is the applicant here all right. [19:24] >> mark sharp going again. This is one of those projects we've been working on for [19:29] several months because it is part of the road for project. There's an existing use to the [19:36] left of the proposed right away that's medical in nature owned by a medical provider. [19:40] so we've continued to work with staff, try to find the best solution so we don't interfere [19:45] and actually enhance what goes on the road for that first step was actually getting the zoning [19:49] in place for what we intend that used to be. So that's why we're in front [19:53] of you today. All right. Any questions for the applicant [19:55] today? We'll see you next week. Thank you. [19:59] thank you. Okay. Moving on. [20:03] next up we have a development agreement. Good afternoon, roger. [20:14] union deputy director. I'm going to go over this development agreement. [20:18] >> this is a standalone development agreement. There's no rezoning associated [20:22] with this. So this is for the pine ridge residential tract as you can [20:26] see on the slide there's a lot of text you can imagine how big the agreement is. [20:29] so this one was for 700 plus acres and for a time period of ten years and this is along [20:39] the columbus parkway. So the agreement came into place when the council has a [20:46] pending ordinance for amendment and now the work with the developer and everything and we [20:53] got a few proposals in there which would all be going through so the first one would [20:58] be reserving approximately 125ft wide right of way for the building and the improvements [21:05] for the building and then that should be completed before two 100 permits and then grasslands [21:10] connect to improvements. That's a part of it and there's a separate ridge road project [21:16] agreement which has its own design standards and permitting and constructions to be [21:20] completed by the developer and that is for the road project corridor. [21:25] I'll show you in the next slide and there's another item which would be the 17 bypass traffic [21:31] signal improvements and intersection. So this is the proposed road [21:35] corridor which would be 125ft all along and there are a few funding sources that are [21:42] identified in the agreement which would be a multi-county business park and the municipal [21:46] improvement district and also a part unit fee of $5,800 which would be generated for the [21:54] project and the agreement also has a provision for additional park acreage for the county [21:59] recreation facility which would before occurs and the total residential units will not [22:06] increase more than 2000. Not all the major. Okay. [22:08] thank you. I will now open this up for public input. [22:13] anybody want to any input? Okay I'll close public input. No vote on this. [22:23] right. Good. Okay. [22:23] moving right along. We're into text amendments. >> we're back over [22:37] . >> all right, so this text amendment is about the zoning [22:42] board of appeals and variances as you all are familiar, we just updated our landscape and [22:46] buffer ordinance right now currently within the ordinance within as far as what the [22:53] zoning board of appeals can do with variances, they cannot grant a variance on any major [22:58] developments. >> so what this would allow is within two thirds vote the [23:04] zoning board of appeals could allow some variances, would still prohibit variances on the [23:09] types the streetscape buffers associated with major development but it would allow [23:13] relief on type and be buffers up to a maximum of 50% so that that's it. [23:21] okay. Thank you very much. Anybody have any questions now? [23:26] okay. >> moving right along. Imagine 2040 comprehensive plan [23:35] . Okay. >> okay. [23:39] so we have our industrial corridors which you all have become really familiar with [23:44] over the last couple of meetings. >> this is our project [23:48] timeline. We are currently in step six of the process. [23:51] we are in the 30 day public comment period and today is just another instance of when [23:55] the public will be able to come and speak about the industrial corridors and give us their [24:00] input. >> we have we opened the survey in march and the survey does [24:05] still remain open today and we've received a few additional responses. [24:10] we're up to 100 and 102 total responses if anybody's watching and I'm taking survey, please [24:14] do. That's only one way we've been gathering public input. [24:21] we've had two public open houses today in those public open houses we do some mapping [24:25] exercises and other things to gather input from the public and get their feedback. [24:32] >> so just a couple things here is some overview of industries that we currently have within [24:40] our county. It would be no surprise tourism industries are our top [24:44] employment industries currently with accommodations and food service and then retail being [24:49] the next one. Other high ranking employment industries that we have are [24:55] construction. >> so let's just to give a idea of where we're at and what [24:59] industries we currently have so the next thing here is what does horry county consider [25:10] industrial? So I want to open by saying that this time does centers are [25:14] not allowed in our zoning ordinance at all so when we talk about light and heavy [25:22] industrial light, industrial is all things like food and beverage manufacturing, [25:26] warehousing and wholesale distribution vehicle and equipment repair and two yards [25:33] and how industrial is things like that plant and asphalt plants I'm cost saying and [25:40] heavier manufacturing uses so why did we need this change so you can see on this map the [25:48] star indicates our economic activity center which is currently the only future land [25:53] use designation that we have staff and sport industrial rezoning that the red that you [25:59] see around it is major residential developments that are either in progress or have [26:04] recently been approved and they're encroaching into those economic activity centers which [26:08] then limits the ability of staff to support rezonings. We have to meet certain [26:12] separation requirements for industrial or residential. So another thing is over the [26:19] years we've seen existing residential start backwards and existing industrial be [26:26] encroached upon by residential development. >> what industrial corridors [26:31] will do is create a dedicated space for future industrial development. [26:38] >> the other thing we've seen some questions on is what about existing residential that may [26:42] be within those industrial corridors any rezoning would still have to comply with the [26:47] separation requirements in our zoning ordinance. So for like a heavy industrial [26:54] of our zoning ordinance intent statement says that m three has to be 1000ft from residential [26:57] so those things wouldn't be would still be considered by staff as part of the rezoning [27:04] process if there is residential inside of an industrial corridor staff would support [27:09] lighter industrial or some transition uses like business parks to transition to the [27:16] heavier industrial within those industrial corridors and as part of this residential [27:20] development will generally be discouraged within these corridors that it could be [27:24] mitigated through buffering or other compatibility measures to make those more suitable within [27:31] or adjacent to the corridors but generally would be discouraged see so other [27:38] reasons why this matters and why don't we for the voters approve the ride for [27:43] transportation program the plan transit transportation improvements total [27:50] approximately $6.6 billion and these projects will require significant amounts [27:54] of materials such as asphalt and concrete and right now we have a limited number of actual [27:59] asphalt plants limited supply can affect the pricing and availability of materials and [28:02] by identify an appropriate locations for a future industrial development [28:07] industrial corridors can create or may create opportunities for these types of uses where they [28:13] are appropriate and meet zoning requirements and then it's jumping around suitability [28:21] model. So we did a suitability model to determine where these [28:25] industrial corridors were suitable. We looked at things like [28:29] wetlands, roads, major roads, railroads, residential and flood zones and we assign those [28:33] things certain weights, flood zones and wetlands were weighted one of the highest the [28:40] highest category and then roads and residential and we closed out with preference being the [28:47] least weighted of those things. >> so on the left hand side you see the original suitability [28:55] model stuff that took that one step further and removed conservation lands fema and [29:02] supplemental flood zones major residential projects from the suitability model to hone it in [29:07] further and then we consider the survey results those color bills indicate right is where [29:15] they did not want to industrial to be and then the yellow and green is where yellow was for [29:21] light and green is for heavy. So those were areas where they thought light and heavy [29:26] industrial would be suitable and then we came up with our original first draft of the [29:31] industrial corridors. >> then we got public comment and in front of all of you is a [29:36] packet of emails that have been sent to us over the last several weeks from the public [29:42] about the draft that's been available on our website. >> so we took and compiled the [29:50] themes that we were seeing within these public inputs and we've seen people ask for more [29:54] community feedback. They're concerned about lack of the or the loss of the rural [29:59] character in our community. They have concerns about environmental wetland impacts [30:02] and the impact on traffic and infrastructure. >> we've also seen some [30:06] comments in support saying that this will create more jobs and economic development and it [30:13] will create areas for planned future industrial growth. So we've seen comments and [30:18] support and comments in opposition and so what we did is we revise the draft [30:26] industrial corridor areas. >> so on the left hand side we have the original map presented [30:33] to you all at the last two at the last planning commission workshop and meeting and on the [30:38] right we have the revised map showing revisions we had made to the industrial corridors [30:45] that we removed some areas we were in some areas that were designated feature as scenic [30:53] and conservation and then we added some areas east of north and south of inner where they [31:00] are now only able to support up to white industrial instead of all the way up heavy [31:04] industrial. So what are our next steps? As you'll see we have an [31:11] additional next step here on july 16th we are doing an additional open house and [31:15] public input for the draft industrial corridors. That's one of the comments that [31:20] we've seen a lot is the need for more community input. So we want the community to [31:26] provide additional input so we will be having another meeting on july 16th in this room at [31:30] 530 just till 7 p.m. Staff will be here to answer questions, get more public input and hear [31:36] from the people this is their plan. We want to hear from them and [31:41] so those are our next steps. >> thank you very much. Qr code for the draft read it [31:48] comment scan it now tell your friends all right this one we are going to open public input [31:59] on this one. Anyone want to come up and do any input today? [32:05] okay I'll close public input last or genda and we'll make a motion to adjourn second all [32:16] those in favor say aye. All next week