1 00:02:44,880 --> 00:02:53,340 Okay, it is 5.30 and we will call planning and zoning commission to order. We will establish quorum, please. 2 00:02:55,870 --> 00:02:56,390 The invader. 3 00:02:56,950 --> 00:02:57,750 Carlin Keller. 4 00:03:01,940 --> 00:03:02,440 Leah Jenkins. 5 00:03:03,080 --> 00:03:03,820 Tam Anderson. 6 00:03:04,300 --> 00:03:04,620 And 7 00:03:12,910 --> 00:03:14,290 would you like to give the invocation? 8 00:03:16,610 --> 00:03:21,970 From the father, thank you for this opportunity to get together this evening. Thank you for the weather we received today. It's a great day. 9 00:03:22,270 --> 00:03:28,190 We pray to you. You got our decisions today that we make the best decisions in the interest of the citizens we serve. 10 00:03:28,190 --> 00:03:34,750 and that you allow us to do so with integrity, and yeah, do you send me a prayer? Amen. 11 00:03:36,030 --> 00:03:37,010 We'll do the prayer. 12 00:03:42,880 --> 00:03:44,500 In the United States of America. 13 00:03:45,140 --> 00:03:51,840 To the Republic, which stands, one nation, under God, indivisible, with liberty and justice for all. 14 00:03:53,040 --> 00:03:54,180 All of the texts fly. 15 00:03:54,640 --> 00:03:58,420 I pledge allegiance to thee, in fact, Texas, one state, under God. 16 00:03:58,420 --> 00:03:58,940 So 17 00:04:11,130 --> 00:04:13,830 do we have any public comments this evening? 18 00:04:14,630 --> 00:04:15,670 Okay, great. 19 00:04:16,570 --> 00:04:18,630 We are going to pull the public hearing. 20 00:04:18,970 --> 00:04:23,450 It's not prepared completely and we will be looking at that next month. 21 00:04:26,290 --> 00:04:30,870 We'll move on to item number four, the consent agenda, 22 00:04:33,480 --> 00:04:35,300 the four things on the consent agenda. 23 00:04:35,960 --> 00:04:41,440 The wishes, does anyone want to pull anything for further discussion from the consent agenda? 24 00:04:41,440 --> 00:04:42,060 I'll 25 00:04:55,250 --> 00:04:57,230 entertain a motion on the consent agenda. 26 00:05:00,480 --> 00:05:01,600 I'll second the motion. 27 00:05:01,980 --> 00:05:03,140 Oh, sorry. 28 00:05:03,360 --> 00:05:03,720 Sorry. 29 00:05:05,060 --> 00:05:07,220 I have motion to pass the consent agenda. 30 00:05:07,960 --> 00:05:09,000 Thank you. 31 00:05:10,020 --> 00:05:11,160 Now do you want a second? 32 00:05:11,720 --> 00:05:12,380 Now I'll second. 33 00:05:12,920 --> 00:05:13,640 This is why I don't talk. 34 00:05:13,780 --> 00:05:15,040 I write all in favor. 35 00:05:17,430 --> 00:05:18,430 All and then opposed. 36 00:05:20,440 --> 00:05:21,940 We'll move into the regular agenda. 37 00:05:22,460 --> 00:05:24,940 Presentation and discussion on zoning fundamentals, 38 00:05:24,940 --> 00:05:28,720 including the city's legal authority to regulate land use. 39 00:05:28,720 --> 00:05:36,300 how zoning districts work by right development, the rezoning process, and the planning and zoning commissions role in reviewing zoning cases. 40 00:05:37,580 --> 00:05:38,060 Kenzie? 41 00:05:45,090 --> 00:05:46,950 All right, thank you all, Madam Chair, commission. 42 00:05:47,530 --> 00:05:52,170 So this presentation, it's our third presentation on the informational series that we've done so far. 43 00:05:52,270 --> 00:05:54,430 We've done the comprehensive plan and annexation of this one zoning. 44 00:05:55,170 --> 00:06:01,010 So the purpose is ultimately to explain what zoning is, how we have illegal authorities to regulate land use, 45 00:06:01,650 --> 00:06:03,750 how development's regulated in the same limits, 46 00:06:03,970 --> 00:06:06,790 ECJ County, and to just help prepare 47 00:06:06,790 --> 00:06:08,110 all for any cases on my seat. 48 00:06:13,620 --> 00:06:13,800 Awesome. 49 00:06:14,920 --> 00:06:15,740 So what is zoning? 50 00:06:16,020 --> 00:06:20,160 Zoning is essentially the when use rules for a property. 51 00:06:20,480 --> 00:06:23,320 So compared to subdivision regulations, 52 00:06:23,520 --> 00:06:27,400 for example, zoning pertains to what you can do 53 00:06:27,400 --> 00:06:32,200 on that property, sorry, so for zoning, for instance, 54 00:06:32,200 --> 00:06:34,820 and you can have a commercial use, 55 00:06:35,340 --> 00:06:36,960 like a store, a residential use, 56 00:06:37,040 --> 00:06:39,540 via a single family home, industrial use, 57 00:06:39,740 --> 00:06:41,140 like a factory for instance. 58 00:06:41,940 --> 00:06:44,320 And really what zoning does is it says 59 00:06:44,320 --> 00:06:46,880 what can be here, where it can be located 60 00:06:46,880 --> 00:06:50,000 and how much of it in terms of like building height, 61 00:06:50,480 --> 00:06:52,240 building size, lot coverage, all those things, 62 00:06:53,040 --> 00:06:56,440 how those can be basically configured on a lot. 63 00:06:57,080 --> 00:06:58,900 And if there are certain activities that are allowed 64 00:06:58,900 --> 00:07:01,100 and we'll get to that with a conditional use section, 65 00:07:01,640 --> 00:07:03,960 but that's a part of the zoning regulations. 66 00:07:04,680 --> 00:07:07,480 And why this matters, why zoning is really a thing 67 00:07:07,480 --> 00:07:09,340 to begin with, it's really to keep conflicting uses 68 00:07:09,340 --> 00:07:09,780 separate. 69 00:07:10,780 --> 00:07:13,460 Most notably, the common example is you don't want 70 00:07:13,460 --> 00:07:15,540 residential uses next to industrial, for instance. 71 00:07:16,220 --> 00:07:20,620 You want to keep more intense uses away from less intense uses 72 00:07:20,620 --> 00:07:23,160 and to have buffer compatibility things between them. 73 00:07:23,960 --> 00:07:24,680 Excuse me. 74 00:07:25,220 --> 00:07:28,220 So the table on the right hand side is our zoning districts 75 00:07:28,220 --> 00:07:29,040 that are out of the lands. 76 00:07:29,040 --> 00:07:32,600 We have AG, so that's agricultural land, future growth areas. 77 00:07:33,120 --> 00:07:38,440 We have three single family residential districts for different densities, duplexable family, 78 00:07:38,720 --> 00:07:39,900 manufactured housing, commercial. 79 00:07:41,080 --> 00:07:45,720 We have three zoning districts for that as well, C2 being downtown, C3 general, C1 is neighborhood, 80 00:07:46,080 --> 00:07:52,160 retail, and then industrial, I have one, I have two, public and parks, so that's public 81 00:07:52,160 --> 00:07:58,060 is institutional uses like city-owned property, churches, places of worship, and then parks 82 00:07:58,060 --> 00:08:05,460 and then special district's PUD plan unit development and then OBOD designation is for our downtown overlay. 83 00:08:08,610 --> 00:08:16,870 So to kind of explain where we have authority in certain areas, so we only have zoning in the city limits. 84 00:08:17,330 --> 00:08:20,950 And what that means is we can only control land uses within our city limits. 85 00:08:21,490 --> 00:08:29,170 Our E2J comparatively, so the EastJs essentially a buffer along our city limit boundary 86 00:08:29,170 --> 00:08:34,110 it no longer really expands when you annex for instance, but in the ETAJ we only are able to 87 00:08:34,110 --> 00:08:39,550 regularly or only able to apply our subdivision regulations to applications. So with that 88 00:08:39,550 --> 00:08:44,470 would entail is really plat review, construction plans, you know looking at infrastructure utilities, 89 00:08:44,830 --> 00:08:51,910 things of that nature. In the ETAJ particularly as it pertains to Liberty Hill with our interlocal 90 00:08:51,910 --> 00:08:56,250 agreement with Williams and County we have a joint review process. So whenever a plat is submitted 91 00:08:56,250 --> 00:09:03,250 for instance the city and the county we provide joint reviews with our standards that we 92 00:09:03,850 --> 00:09:08,030 that we provide comments on and so the applicant will receive that will go through the process 93 00:09:08,030 --> 00:09:13,470 and it will go through the city as opposed to Commissioner's Court but with that being said outside 94 00:09:13,470 --> 00:09:19,370 of the ECJ when it's not in the city that is on a on a corporate county and so that is purely county 95 00:09:19,370 --> 00:09:21,030 section, we do not get involved all. 96 00:09:23,430 --> 00:09:28,030 Next slide, please. Thank you. So, how zoning districts work? 97 00:09:28,710 --> 00:09:33,270 So, East District has specific rules about the allowed uses. So, yeah, for instance, if it's 98 00:09:33,270 --> 00:09:40,270 residential commercial industrial, lot requirements, what's being minimum size, you know, lot with 99 00:09:40,910 --> 00:09:48,170 building standards. So, there's maximum heights in most cases. Setbacks, those vary by the land uses, 100 00:09:48,170 --> 00:09:52,510 for instance, there's a lot coverage for storm water mitigation, there's other 101 00:09:52,510 --> 00:09:56,730 requirements like parking landscaping, outdoor lighting, etc. And so the table 102 00:09:56,730 --> 00:10:01,190 that was provided in there was kind of just sort of a translation table so to 103 00:10:01,190 --> 00:10:04,010 speak of, you know, common questions that y'all may have and where that would be 104 00:10:04,010 --> 00:10:04,990 located in the EDC. 105 00:10:07,880 --> 00:10:12,680 So this slide is understanding bi-right development. This is a 106 00:10:13,840 --> 00:10:23,220 A common question that we get, understandably, from the community, whenever people see things 107 00:10:23,220 --> 00:10:28,260 being constructed in their community, they'll often wonder, why are we getting a chicken 108 00:10:28,260 --> 00:10:31,520 place, for instance, or are we getting the fifth chicken place, or why are we getting, 109 00:10:32,140 --> 00:10:35,200 you know, like this automotive use, or things like that. 110 00:10:35,200 --> 00:10:42,220 that really what this slide is intending to explain is that, you know, with state law 111 00:10:42,220 --> 00:10:48,020 and this is other states, not just Texas, but if a project, you know, if that use is permitted 112 00:10:48,020 --> 00:10:50,960 within that zoning district, it's allowed to be done. 113 00:10:51,360 --> 00:10:54,100 So that's really the purpose of what this is trying to explain. 114 00:10:54,320 --> 00:10:58,720 So I provided a citation where y'all can find this directly in the UDC. 115 00:10:59,340 --> 00:11:07,740 So we have what's called our use table and it'll go by particular land use and we'll describe is it permitted could it be 116 00:11:07,740 --> 00:11:12,040 conditionally permitted meaning that could they get a conditional use permit approved by the council. 117 00:11:12,740 --> 00:11:18,420 And then that use could be there or is it just prohibited, which means you would you can't do it or you have to rezone essentially. 118 00:11:24,700 --> 00:11:31,720 So how reasoning works for this slide, for the process that flow chart, we will be sending 119 00:11:31,720 --> 00:11:36,420 on updated one, that one was from June of this year, we've done a new one that will forward 120 00:11:36,420 --> 00:11:40,880 on to y'all that reflects our process, there's some tweaks that we've made. 121 00:11:40,880 --> 00:11:44,780 But ultimately, our process is about 45 to 60 days. 122 00:11:45,020 --> 00:11:48,080 The reason for that mostly is providing public notice. 123 00:11:48,080 --> 00:11:52,840 We have to issue a newspaper ad describing the public hearings. 124 00:11:52,840 --> 00:11:54,800 We also have to provide property owner notices. 125 00:11:56,040 --> 00:11:57,300 But ultimately, an applicant will submit. 126 00:11:57,500 --> 00:12:05,460 We will review it if it's just a straight land use, you know, say you're just going from 127 00:12:06,600 --> 00:12:12,380 commercial, you know, C-1 to C-2, for instance, that is a more straightforward process. 128 00:12:12,380 --> 00:12:15,960 If it's a planning and development, for instance, where there's an actual ordinance, and 129 00:12:15,960 --> 00:12:19,700 there's different standards being done, that may require more back and forth. 130 00:12:20,220 --> 00:12:23,900 The by and large process, they would submit, we would review, we would schedule it for meeting, 131 00:12:24,000 --> 00:12:27,680 provide all proper notice, bring it to planning and zoning commission first, or we all would 132 00:12:27,680 --> 00:12:31,980 then make a recommendation to the City Council to consider, and then the City Council would 133 00:12:31,980 --> 00:12:33,300 make a decision and pass up ordinance. 134 00:12:33,940 --> 00:12:39,300 So just a couple of things to touch on for a zoning case, and you all know this very well. 135 00:12:39,400 --> 00:12:41,360 You all have done some comprehensive plan amendments yourselves. 136 00:12:42,380 --> 00:12:45,060 You know, every rezoning request must align with a comprehensive plan. 137 00:12:45,420 --> 00:12:49,280 In our case with the city and our comprehensive plan, we have not just the future land use map, 138 00:12:49,400 --> 00:12:50,620 but we also have a growth sector's map. 139 00:12:51,260 --> 00:12:57,940 So in our case, specifically, we need to make sure that our growth sectors and flume are in place, 140 00:12:57,940 --> 00:13:00,020 and they're compatible with the proposed rezoning. 141 00:13:01,220 --> 00:13:07,440 The protest petition, that's just kind of, you know, a factoid free all of 20% of 142 00:13:07,440 --> 00:13:10,700 property owners within 200 feet of jacked, the council also have a super majority. 143 00:13:11,880 --> 00:13:17,740 So, three-fourths of them to vote for approval, and then in our code specifically, there's 144 00:13:17,740 --> 00:13:24,340 one year waiting period, so if an application is denied, they cannot submit a reason for another 145 00:13:24,340 --> 00:13:24,640 year. 146 00:13:24,640 --> 00:13:29,480 So some 147 00:13:31,970 --> 00:13:37,770 special rules, I say special, just a couple of things I wanted to touch on. 148 00:13:38,010 --> 00:13:45,970 So legal law and conforming is, and I use this term loosely, it's things that are considered 149 00:13:45,970 --> 00:13:46,810 grandfathered. 150 00:13:47,230 --> 00:13:52,330 They can, in other cases different, they can generally continue, but expansion and modification 151 00:13:52,330 --> 00:13:54,910 are typically limited on what can be done. 152 00:13:56,470 --> 00:14:09,970 but ultimately that use can continue and if there are any modifications for instance if there's not a permit pulled or something if something is modified or expanded that that use would no longer continue and they will lose that sound as potentially. 153 00:14:09,970 --> 00:14:15,370 And so, special districts, what we touched on earlier, planated developments. 154 00:14:16,190 --> 00:14:17,530 So that's a special district. 155 00:14:18,790 --> 00:14:24,910 In our code, the intent is to allow mixed uses, and that's typically what it is used for, 156 00:14:25,050 --> 00:14:31,790 but a planated development, it's an overlay that basically has certain standards that aren't 157 00:14:31,790 --> 00:14:35,030 found in the code that would essentially enhance a project. 158 00:14:35,030 --> 00:14:40,910 And so there's certain quote-unquote, you know, there's things that an applicant can request, 159 00:14:41,270 --> 00:14:48,590 you know, for instance, let's say they want, I don't know, a reduced lot with, you know, 160 00:14:48,790 --> 00:14:55,370 that that's different from what's currently our code, you know, for that, you know, other 161 00:14:55,370 --> 00:14:59,270 things could be enhanced, like, and these aren't equatable, but like a landscaping for instance, 162 00:14:59,270 --> 00:14:59,950 as they're there certain- 163 00:15:00,000 --> 00:15:29,880 I'm going to give and take. There's things that you can do in a pod that are tailored specifically to a development. And the downtown, really, I just wanted to note that for y'all, it is written on our code. We've had questions about that. And that's been there since 2005, but it was never actually adopted. So we are going to seek to fix that, maybe see rewrite, but that is something in our code. And then religious land uses. So just really mainly what I want to touch on is for places of worship in particular. 164 00:15:29,880 --> 00:15:31,860 they can be located at Netty's own district. 165 00:15:32,580 --> 00:15:35,360 So, in fact, if something comes forward to you all, 166 00:15:35,580 --> 00:15:38,520 and if, you know, if you all notice for instance, 167 00:15:38,700 --> 00:15:40,280 hey, they're in C3, they're not in, 168 00:15:40,660 --> 00:15:42,680 I, you know, the institutional loan district, 169 00:15:43,140 --> 00:15:45,240 they are allowed to do that by federal law. 170 00:15:46,040 --> 00:15:47,820 And then a couple of prohibited practices 171 00:15:47,820 --> 00:15:48,820 are spot zoning. 172 00:15:49,740 --> 00:15:51,380 So, that's singling out one property. 173 00:15:52,180 --> 00:15:55,400 The best example I can give, say there's a single-failing 174 00:15:55,400 --> 00:15:58,220 residential neighborhood, and then just surrounded 175 00:15:58,220 --> 00:16:02,620 and a sea of homes, and somebody's like, I want to be commercial, that would be spot learning, 176 00:16:02,680 --> 00:16:05,140 and that's really prohibited, and we don't do that. 177 00:16:06,060 --> 00:16:12,340 Then contract zoning, this one, it more so happens typically within agreements, but 178 00:16:12,340 --> 00:16:19,640 really it's an exchange of conditioning, zoning approval for other things. 179 00:16:20,720 --> 00:16:24,820 And so you don't do that contractually, and you should not do that contractually, and that's 180 00:16:24,820 --> 00:16:25,260 why it's legal. 181 00:16:26,040 --> 00:16:27,120 Next slide, please. 182 00:16:28,660 --> 00:16:36,340 So the Commission's role in zoning decisions, so the table to the left, it really just describes 183 00:16:36,340 --> 00:16:41,980 certain responsibilities, who that falls with, some overlap with the PMZ and Council, 184 00:16:42,900 --> 00:16:48,860 and then on the right-hand side, just a couple of footnotes, maybe for all to consider, should 185 00:16:48,860 --> 00:16:51,840 you choose to do in the future on how to evaluate a rezoning request? 186 00:16:51,840 --> 00:16:56,540 We always have staff reports in our recommendations, you know, asking us questions, we all can certainly 187 00:16:56,540 --> 00:16:56,960 do that. 188 00:16:57,300 --> 00:16:58,000 But a couple things. 189 00:16:58,580 --> 00:17:03,180 So if it aligns with, if the request aligns with the future land use map and gross 190 00:17:03,180 --> 00:17:07,960 interest map, does it fit with surrounding uses and development patterns, does the proposed 191 00:17:07,960 --> 00:17:09,920 own industry or conditional use make sense? 192 00:17:10,480 --> 00:17:13,360 And are there any concerns related to legitimate land use impacts? 193 00:17:14,640 --> 00:17:16,580 So those are pretty key. 194 00:17:18,400 --> 00:17:20,000 And yes, I believe those are the same. 195 00:17:20,000 --> 00:17:28,860 All right, so to wrap it up, so the first item we were trying to discuss zoning, it is 196 00:17:28,860 --> 00:17:33,660 the rulebook it creates legal rights and these rezoning decisions they can determine what 197 00:17:33,660 --> 00:17:36,100 eventually is allowed by right even if it's not today. 198 00:17:37,040 --> 00:17:41,420 And the PNZ Commission currently only reduced properties inside the city limits for zoning, 199 00:17:41,540 --> 00:17:42,820 because zoning is only in the city limits. 200 00:17:43,660 --> 00:17:46,300 And you all are also recommending body on annexation. 201 00:17:46,580 --> 00:17:48,440 There's no zoning that exists in the EGR County. 202 00:17:49,180 --> 00:17:52,740 following the comprehensive plan, re-zoning muscle line with our full human 203 00:17:52,740 --> 00:17:56,300 growth centers map and our plan goals in general. The commission's role when it 204 00:17:56,300 --> 00:18:00,560 comes to zoning is advisory. The commission makes recommendations on 205 00:18:00,560 --> 00:18:04,820 planning standards and council adopt assortances. Avoiding legal practice like 206 00:18:04,820 --> 00:18:10,600 spot zoning or contract zoning. We don't do that. Special protections like legal 207 00:18:10,600 --> 00:18:14,580 long-performing. Certain uses can be put in fathered and religious uses were 208 00:18:14,580 --> 00:18:20,080 protected? Sorry, all my voices. Do you have any questions? I'd be happy to answer. 209 00:18:20,740 --> 00:18:26,180 Thank you. I don't tell you it's good to hear. I know one of the things, I've said before 210 00:18:26,180 --> 00:18:30,380 one of the reasons that I got on the commission as I was one of those people saying, why are we 211 00:18:30,380 --> 00:18:37,280 getting another fill in the blank? And it makes sense when you think about Texas and land rights, 212 00:18:38,180 --> 00:18:43,580 you know, person purchases land as long as it's within the structure, we don't have the right to 213 00:18:43,580 --> 00:18:48,840 tell them we have enough of you and so I appreciate taking the time to I think 214 00:18:48,840 --> 00:18:54,280 that's the number one thing I see in here out in the community so any 215 00:18:54,280 --> 00:19:02,220 questions or comments I think my question is okay so it's we make the 216 00:19:02,220 --> 00:19:09,920 recommendation council approves it staff carries it out that's correct so what 217 00:19:09,920 --> 00:19:17,760 What happens so is staffs allowed to just override what the commission and the council 218 00:19:17,760 --> 00:19:23,200 have approved because I joined this council because I see that way too often. 219 00:19:25,920 --> 00:19:30,780 So staff are all as implement whatever is adopted by council. 220 00:19:31,260 --> 00:19:36,140 But staff is allowed to create variances without council or commissions. 221 00:19:38,100 --> 00:19:43,620 So if it's a plan unit development, you cannot vary from the PUD, you'd have to amend it. 222 00:19:44,020 --> 00:19:48,900 If it's a rezoning, you could do a variance for that zoning district, the new one, but 223 00:19:48,900 --> 00:19:50,620 that's how this process will be done for variances. 224 00:19:51,160 --> 00:19:57,760 So then when staff does create a variance, what is the path forward to reconcile that? 225 00:19:58,480 --> 00:20:01,180 For a zoning variance, it'd be through the zoning board adjustment, which we're still trying 226 00:20:01,180 --> 00:20:01,500 to form. 227 00:20:01,500 --> 00:20:08,580 But yeah, there's no answer. So I think I mean what I'm hearing is in those cases 228 00:20:09,180 --> 00:20:14,600 Probably we need to bring them to staff and then potentially even bring them back to commission if we're noticing them or 229 00:20:14,600 --> 00:20:20,120 What are the steps for variances can if we if we're concerned that 230 00:20:20,880 --> 00:20:21,440 the 231 00:20:21,440 --> 00:20:28,160 Required the whatever has been passed by commission and then by city council isn't being followed yes 232 00:20:28,160 --> 00:20:31,740 Yes, yeah, we reach out to, so it's a Robin or Brandon. 233 00:20:32,400 --> 00:20:32,580 Okay. 234 00:20:33,760 --> 00:20:34,060 Thank you. 235 00:20:34,260 --> 00:20:34,840 Thank you. 236 00:20:34,840 --> 00:20:37,160 I think it's maybe, oh, what was the actual process? 237 00:20:37,340 --> 00:20:39,880 So maybe not even zoning, but there's other ordinances, I think, 238 00:20:39,940 --> 00:20:41,000 that's what we're concerned about. 239 00:20:43,270 --> 00:20:46,690 So if there's supposed to be some ordinances or zoning, 240 00:20:47,130 --> 00:20:49,470 and it doesn't look like they're being executed as intended, 241 00:20:49,850 --> 00:20:51,170 what is actually the process? 242 00:20:51,350 --> 00:20:54,390 Do we just hear the commission we say, hey, this is an agenda item review? 243 00:20:54,910 --> 00:20:58,610 So if it's, and let me get, so if it's outside the scope of planning and zoning, 244 00:20:58,610 --> 00:21:03,910 then we are residents of the community and so then we handle those as 245 00:21:03,910 --> 00:21:09,190 residents. So in those cases they're reporting mechanisms online or in 246 00:21:09,190 --> 00:21:13,490 person you can come and sign up to talk with the commission I've done it or 247 00:21:13,490 --> 00:21:16,430 the city council I've done that a couple of different times on issues that I've 248 00:21:16,430 --> 00:21:21,470 had. So I think it depends on whether or not that item is a planning and zoning item 249 00:21:21,470 --> 00:21:26,050 or not. If it's planning and zoning then you go back to our liaison let them know 250 00:21:26,050 --> 00:21:28,630 So ask for it to be put on to the agenda. 251 00:21:29,090 --> 00:21:33,350 We look at the agenda about a week and a half before it goes up. 252 00:21:34,030 --> 00:21:36,390 And so we can take care of it that way. 253 00:21:36,490 --> 00:21:41,630 But if it's an item that is not planning and zoning related, then you deal with that as 254 00:21:41,630 --> 00:21:46,050 a citizen, which means, you know, those vehicles that are available for that. 255 00:21:48,500 --> 00:21:50,540 Do you want to add anything to that or? 256 00:21:50,860 --> 00:21:50,940 No. 257 00:21:51,320 --> 00:21:51,360 Okay. 258 00:21:52,360 --> 00:21:58,220 Yeah, so another question on the key takeaway item two is no zoning system today, but okay, 259 00:21:58,320 --> 00:22:02,460 so if it's getting annexed, I think less than you mentioned, the fault is ag. 260 00:22:02,740 --> 00:22:03,300 Yes, that's correct. 261 00:22:03,420 --> 00:22:08,100 Can it be annexed in a medley turn to another zone, or you have to, okay? 262 00:22:08,600 --> 00:22:11,140 Yeah, so and that is a common practice that we do. 263 00:22:11,780 --> 00:22:15,300 So what we would do is we would process an annexation request and a zoning request at the same 264 00:22:15,300 --> 00:22:17,240 time and we would put them on the same agenda. 265 00:22:17,240 --> 00:22:21,200 You would put annexation first, kind of like sequentially and then you would have the zoning item 266 00:22:21,200 --> 00:22:24,520 right after that. So it would be like, add for like five seconds in the 267 00:22:24,520 --> 00:22:27,240 maybe. Yeah, technically two steps, but they're at the same level. 268 00:22:27,240 --> 00:22:30,120 Right. Yes. We're going to be done after the fact, too. But that's 269 00:22:30,120 --> 00:22:30,760 normally how it's done. 270 00:22:38,380 --> 00:22:41,660 There are questions. I guess I'll do one more. So, I guess, 271 00:22:41,720 --> 00:22:43,860 I really, of course, a bit like, so we had this up. This is usual. So 272 00:22:43,860 --> 00:22:47,720 thanks for sharing. I do appreciate it. For what we have been seeing here, 273 00:22:47,980 --> 00:22:51,740 or at least I've been saying, what do you think are things that we just need 274 00:22:51,740 --> 00:22:52,740 to really keep an eye on? 275 00:22:56,210 --> 00:22:57,830 I really keep an eye on this thing. 276 00:22:57,830 --> 00:22:59,990 Right. I think, 277 00:23:02,640 --> 00:23:12,260 no, I understand, you know, if there is something that we see we will address in the staff report, we don't really shy away from that. 278 00:23:12,460 --> 00:23:16,580 We will make a recommendation of disapproval if we have to, if we can't come to consensus and I have to go to a meeting. 279 00:23:17,800 --> 00:23:25,660 But in general, kind of in the PNZ case, specifically, like I've seen things like 280 00:23:25,660 --> 00:23:28,200 spa zoning couple times, those are the only things I can think, you know, like 281 00:23:28,200 --> 00:23:32,500 gotchas that maybe you wouldn't expect but typically there's always that 282 00:23:32,500 --> 00:23:35,860 there's an issue, staff is going to notify you all via the staff report and let you 283 00:23:35,860 --> 00:23:40,840 know in advance. Okay, thank you. Any other questions? 284 00:23:43,660 --> 00:23:45,160 Okay, we'll move on to 285 00:23:45,160 --> 00:23:49,560 reports, receive the UDC re-write update report, McKinsey. 286 00:23:59,500 --> 00:23:59,900 Okay, 287 00:24:03,360 --> 00:24:07,720 thank you very much. So within the UDC re-write update report, there were just a couple 288 00:24:07,720 --> 00:24:11,540 things I want to touch on. So since our last meeting, we had the open house number 289 00:24:11,540 --> 00:24:16,400 one, the code roundup that was held on December 11th, that went really well. So thank you to 290 00:24:16,400 --> 00:24:19,900 all the commissioners and everyone that's watching, everyone that came out. It was really 291 00:24:19,900 --> 00:24:25,340 really great. Thank you for the input. For Module 1, we just want to update y'all that 292 00:24:25,340 --> 00:24:30,040 these metrics draft for Module 1 that was received by staff. We'll be having a UDC 293 00:24:30,040 --> 00:24:34,540 advisory committee meeting this month. Staffs also were doing that internally currently, 294 00:24:34,740 --> 00:24:41,240 so we do have that. So on January 29th, that will be our UDC advisory committee. Those 295 00:24:41,240 --> 00:24:48,400 are updates for this past month. So the UDC, the first part has been delivered. If 296 00:24:48,400 --> 00:24:53,200 If you're from my perspective, we're going to be meeting as McKinsey said at the end 297 00:24:53,200 --> 00:24:53,640 of the month. 298 00:24:53,940 --> 00:24:59,160 If you want to see what has been proposed, if you'll reach out to staff, and if you 299 00:24:59,160 --> 00:25:05,100 want to give input so that I can represent planning and zoning, again, you need to send that 300 00:25:05,100 --> 00:25:11,760 to McKinsey, and then we'll coordinate to get it to the advisory committee for our meeting 301 00:25:11,760 --> 00:25:13,660 on the 29th. 302 00:25:13,660 --> 00:25:20,280 please do not wait until the 28th to provide that input because I won't have enough time to 303 00:25:20,280 --> 00:25:27,340 read it in order to represent any input that you all have. Yes, if you all could reach out to me 304 00:25:27,340 --> 00:25:31,420 and CC Robert as well, we'll provide her contact information after the meeting, but if you all can do 305 00:25:31,420 --> 00:25:36,840 that, that'd be great. Thank you. Any questions or any comments related to the UDC? 306 00:25:37,240 --> 00:25:42,260 No, I have something. That's why you're here. Go ahead. Yeah, maybe this product last last 307 00:25:42,260 --> 00:25:43,900 last time, so I apologize if this is repetitive. 308 00:25:44,480 --> 00:25:47,040 The open house, is there any consolidated feedback 309 00:25:47,040 --> 00:25:48,700 from the residents on that? 310 00:25:49,480 --> 00:25:52,500 Yes, we had, sorry, I had to give a number 311 00:25:52,500 --> 00:25:54,560 in the report, it was about 40 something responses. 312 00:25:55,520 --> 00:25:58,540 So we have provided that to our consults 313 00:25:58,540 --> 00:25:59,260 and we have that information. 314 00:26:00,820 --> 00:26:03,240 Okay, so that the link that's on the. 315 00:26:03,820 --> 00:26:04,000 Yes. 316 00:26:04,200 --> 00:26:06,480 As an information, did you have anything 317 00:26:06,480 --> 00:26:08,680 that jumped out of you from like the planning? 318 00:26:09,360 --> 00:26:09,760 Um, 319 00:26:12,710 --> 00:26:17,910 um, it was, you know, a lot of the feedback, um, it was, there was a lot of traffic, 320 00:26:18,170 --> 00:26:21,310 a lot of water, kind of typical things that we would expect. There wasn't anything that 321 00:26:21,310 --> 00:26:27,710 was different that jumped out at me per se. Nothing new or surprising. Right. No one solved 322 00:26:27,710 --> 00:26:31,830 our water problem. No, not over. Not within the last month. No. 323 00:26:33,210 --> 00:26:37,090 I'll piggyback off that. Did you have anything maybe from a commercial side of things that 324 00:26:37,090 --> 00:26:39,070 And people were already unhappy with? 325 00:26:40,130 --> 00:26:41,430 Magna read the comment myself. 326 00:26:42,110 --> 00:26:48,130 Yeah, so there was one that I did expect that maybe like y'all may not know of. 327 00:26:48,530 --> 00:26:51,030 There's been some concern about our change of use requirements. 328 00:26:52,070 --> 00:26:54,650 Every city typically has these, but ours are. 329 00:26:55,470 --> 00:26:58,850 They are kind of a one-size-fits-all if you're doing a change of use. 330 00:26:58,850 --> 00:27:00,890 It isn't really helpful for infill. 331 00:27:00,950 --> 00:27:03,450 It kind of treats everything the same. 332 00:27:03,450 --> 00:27:08,870 You know, whether it be, you know, just a single family residential hometown town or something in another area 333 00:27:08,870 --> 00:27:14,890 So that is one of the things that we see to improve in the UDC, but that was brought up and that was it was a good point 334 00:27:15,350 --> 00:27:20,470 So that was the main thing that we heard there were some things about signage that weren't specific that those are the main things 335 00:27:24,600 --> 00:27:27,660 Okay, we'll move on to receive the projects in motion report 336 00:27:33,500 --> 00:27:34,180 She's not here 337 00:27:38,140 --> 00:27:42,500 So yeah, so we have four new projects. 338 00:27:43,080 --> 00:27:48,000 There's a resounding that will be coming to PNZ for the Cemetery Association on Brown Bridge. 339 00:27:48,600 --> 00:27:50,460 A conference of minimum and as well. 340 00:27:51,040 --> 00:27:56,600 And then we have a subdivision variance that staff is reviewing right now and then construction plan application. 341 00:27:57,920 --> 00:28:00,320 And then for our approved projects, we have three flats. 342 00:28:01,160 --> 00:28:06,860 And then four construction plans in the site plan that was conditionally through that we will be taking to council. 343 00:28:06,860 --> 00:28:15,440 So that will be on and up coming agenda there's some there's some correspondence being thought about an easement, but it will be on on an agenda soon. 344 00:28:17,710 --> 00:28:18,590 That's all we have. 345 00:28:19,770 --> 00:28:26,510 And there was a question that came in from a commissioner we didn't make it on and time for this agenda. 346 00:28:26,930 --> 00:28:32,790 We'll put it on to the next agenda so that it can be discussed since it didn't make it on to this agenda item. 347 00:28:32,790 --> 00:28:38,970 Okay, so I have a question on this, just for clarity, in past meetings, if we had a question 348 00:28:38,970 --> 00:28:46,190 about a specific item that just had an address, you advised us to put in an open records 349 00:28:46,190 --> 00:28:49,650 request, well then when I did that, I'm told there is no data. 350 00:28:49,990 --> 00:28:58,310 So how do we find out what the details are on a specific line item, or more? 351 00:28:59,650 --> 00:29:02,810 Do you know what type of application it was by chance? 352 00:29:03,590 --> 00:29:09,990 It was just an address and I literally copied from this exact thing to put into my request 353 00:29:09,990 --> 00:29:15,830 for the Open Records report and was told that there was nothing on that. 354 00:29:16,510 --> 00:29:16,630 Okay. 355 00:29:18,490 --> 00:29:21,830 If you could email me and I'll respond you separately. 356 00:29:22,190 --> 00:29:22,270 Okay. 357 00:29:22,410 --> 00:29:22,650 That's okay. 358 00:29:23,590 --> 00:29:24,210 All right. 359 00:29:24,330 --> 00:29:24,590 Thank you. 360 00:29:24,590 --> 00:29:30,640 Yeah. Okay. Anything else on reports in motion? 361 00:29:32,870 --> 00:29:35,510 Okay. Planning and development department 362 00:29:35,510 --> 00:29:36,230 comments. 363 00:29:39,450 --> 00:29:43,410 So there's only one but we have our new planning and development director Rob 364 00:29:43,410 --> 00:29:48,530 Amiga. Welcome. She started on Monday. We're very excited to have her. So welcome. I would 365 00:29:48,530 --> 00:29:56,430 also like to ask staff I understand that the City Council when they met the last regular 366 00:29:56,430 --> 00:29:59,950 meeting. There was a call for additional training for the... 367 00:30:00,000 --> 00:30:06,460 Councillor the commission. Could you tell us just a little bit about that, or is there someone here that can? 368 00:30:17,390 --> 00:30:17,890 Thank you. 369 00:31:08,490 --> 00:31:09,410 Thank you very much. 370 00:31:13,240 --> 00:31:30,220 And the other thing I have is, I believe it's about to be time for us to do our joint meeting with city council, and I want to make sure that we get that report and we're not kind of last minute. So what do we have a plan in place, or do you want to wait and cover that at our next meeting? 371 00:31:31,520 --> 00:31:35,540 Yes, I can write an update to you. I'll get with Robin on that and write an update to you. 372 00:31:35,820 --> 00:31:37,480 Okay, great. Thank you so much. 373 00:31:40,130 --> 00:31:41,170 Anything else? 374 00:31:42,490 --> 00:31:48,990 Okay, it is, keep looking over there and it's not there. It is 6 o'clock and we will adjourn. 375 00:31:48,990 --> 00:31:49,510 Oh, 376 00:32:03,420 --> 00:32:03,560 sorry