1 00:00:02,610 --> 00:00:19,050 All right. Good evening, everyone. Welcome to our 6 p.m. Special City Council meeting. Today is Tuesday, March 25, and our topic tonight is our capital investment strategy. We will start off with a quick roll call, and then we'll go to agenda approval. 2 00:00:20,310 --> 00:00:26,070 Councilmember Van Orman here. Councilmember Kurtz. Councilmember Ball here. Mayor Pro Tem Cargill. 3 00:00:26,470 --> 00:00:31,610 Present. Councilmember Spencer. Present. Councilmember Dean. Councilmember Dunn. 4 00:00:31,930 --> 00:00:38,890 I'll get happy to be here. Councilmember Kennedy. Okay. I'll present an accounted for. We have an agenda approval. 5 00:00:39,250 --> 00:00:42,410 Mayor I'll make a motion to approve the agenda as sprinted. 6 00:00:42,410 --> 00:00:43,310 Thank you. 7 00:00:43,310 --> 00:00:43,750 We have a second. 8 00:00:43,870 --> 00:00:44,130 Second. 9 00:00:44,310 --> 00:00:46,010 Second by Council Member Dunn. 10 00:00:46,490 --> 00:00:49,670 All those in favor of approving the agenda as printed, please say aye. 11 00:00:49,990 --> 00:00:50,250 Aye. 12 00:00:50,470 --> 00:00:51,090 Any opposed? 13 00:00:51,570 --> 00:00:51,670 All right. 14 00:00:51,710 --> 00:00:52,890 Motion passes, 7-0. 15 00:00:53,470 --> 00:00:54,990 So we are up to citizen comments. 16 00:00:55,290 --> 00:00:58,470 So we do have a citizen comment period only at the beginning of this meeting tonight. 17 00:00:58,610 --> 00:01:04,550 So if there's anyone in chambers who'd like to make a comment, please go ahead and fill out the yellow sheet at the next of the door. 18 00:01:04,810 --> 00:01:11,030 If there's anybody online who'd like to make a citizen comment, please send a note to our meeting host in the chat feature. 19 00:01:11,030 --> 00:01:12,190 and we will call on you. 20 00:01:13,470 --> 00:01:13,650 Uh-oh. 21 00:01:14,950 --> 00:01:15,710 Amber alert. 22 00:01:18,610 --> 00:01:18,670 Okay. 23 00:01:18,910 --> 00:01:20,870 Um, so I don't see anybody here. 24 00:01:20,970 --> 00:01:21,890 Do we have anybody online? 25 00:01:25,420 --> 00:01:25,820 Nope. 26 00:01:26,260 --> 00:01:26,660 Okay. 27 00:01:27,060 --> 00:01:27,660 All right. 28 00:01:27,820 --> 00:01:30,540 So we will go right on to reports and inquiries. 29 00:01:30,900 --> 00:01:34,380 So we first, we have to say, well, only we have the city administrator report. 30 00:01:35,120 --> 00:01:35,760 Thank you, Mayor. 31 00:01:35,840 --> 00:01:39,680 I just wanted to take a couple of minutes to update the council on a couple of things. 32 00:01:40,480 --> 00:01:42,700 Back on February the 4th, 33 00:01:42,700 --> 00:01:50,300 The council adopted a resolution to adopt an updated commute trip reduction plan. 34 00:01:50,600 --> 00:01:57,000 This is a, this is something that's spoken in County and is implemented through an organization 35 00:01:57,000 --> 00:01:58,880 called Commute Smart Northwest. 36 00:01:59,900 --> 00:02:05,400 And so we've been a partner with this as long as he has been in court. 37 00:02:05,400 --> 00:02:12,640 And it's with the other pleasure that I bring to you an 38 00:02:12,640 --> 00:02:12,980 announcement. 39 00:02:13,640 --> 00:02:17,160 Thank you, Garcia, with our employee transportation. 40 00:02:18,520 --> 00:02:19,480 City of Louis, 41 00:02:21,260 --> 00:02:26,120 was honored to have you in that ceremony of the Commutes 42 00:02:26,120 --> 00:02:30,360 Smart and Office organization as the champion in ETC for 43 00:02:30,360 --> 00:02:30,980 the first quarter. 44 00:02:30,980 --> 00:02:39,500 And this not is in recognition of her efforts to gain participation within the city of Liberty 45 00:02:39,500 --> 00:02:45,640 Lake, among its staff, but also her own contribution to the program by participating herself. 46 00:02:46,100 --> 00:02:52,220 And so it was pointed out during the ceremony that she took over this role in 2021. 47 00:02:52,980 --> 00:02:59,040 And since 2021, between 2021 and the end of the first quarter, our participation has grown 48 00:02:59,040 --> 00:03:06,460 20 fold. And so that is a testament to her dedication and effort as coordinator of this program. 49 00:03:06,460 --> 00:03:10,980 And I just wanted to make sure that you all were aware that she was recognized and we're glad 50 00:03:10,980 --> 00:03:16,520 to have her on our team. Great. Thanks, Mark. Yeah, here's the list. Very cool. And then the second 51 00:03:16,520 --> 00:03:21,960 thing, I just want to remind everyone that what ends alive that you're out in a moment. Mark, 52 00:03:22,000 --> 00:03:26,820 your microphone's kind of going in and out. I don't know if it's if you're not close enough for what 53 00:03:26,820 --> 00:03:29,360 So there 54 00:03:32,050 --> 00:03:34,510 may be a battery issue. 55 00:03:36,370 --> 00:03:41,750 So the second thing that I wanted to remind you all of, as you're out in between now and 56 00:03:41,750 --> 00:03:48,910 Monday, the 31st, finding down the period of response for the 2025 Community Satisfaction 57 00:03:48,910 --> 00:03:49,250 Survey. 58 00:03:49,790 --> 00:03:56,230 So if anyone asks about it, encourage them if they receive the invitation to participate. 59 00:03:56,230 --> 00:04:02,050 if they haven't yet already, we will close it on the 31st and then start compiling results into 60 00:04:02,050 --> 00:04:06,770 a report that we will bring back to council. The plan right now is to have that 61 00:04:07,770 --> 00:04:15,230 brought back to you the first meeting in May and so we look forward to not only seeing with the 62 00:04:15,230 --> 00:04:22,230 results from this year's survey are but also being able to compare now this year's results to last 63 00:04:22,230 --> 00:04:25,150 years' results. And so any questions about that? 64 00:04:27,470 --> 00:04:29,810 Okay, that's next in my report, ma'am. 65 00:04:29,850 --> 00:04:34,250 Okay, well then that brings us right into number six workshop discussions and it's a second 66 00:04:34,250 --> 00:04:35,970 to last item so we must be almost done. 67 00:04:38,190 --> 00:04:41,590 So we are going to embark here on our capital investment 68 00:04:41,590 --> 00:04:47,310 strategy. You guys have some handouts in front of you and I will let Mark take it away with Kyle 69 00:04:47,310 --> 00:04:55,370 is back up. Yeah so I'm going to kick off and just very quickly mention we've got a discussion 70 00:04:55,370 --> 00:05:01,750 for you tonight. We've talked about this for a while. This is a very important discussion, 71 00:05:02,010 --> 00:05:10,530 however we consider this to be a starting point. Obviously we want to bring information to you 72 00:05:10,530 --> 00:05:16,710 that allows you over time to make informed decisions, but this is going to be an ongoing 73 00:05:16,710 --> 00:05:21,210 dialogue that we're going to start tonight. The purpose of tonight's conversation is to 74 00:05:22,590 --> 00:05:28,950 present some information, give plenty of opportunity for you to ask questions, have dialogue 75 00:05:28,950 --> 00:05:34,890 amongst yourself. We won't be asking you to make any decisions tonight, although we do have 76 00:05:34,890 --> 00:05:38,190 a couple of recommendations that you'll see at the end 77 00:05:38,190 --> 00:05:41,690 that if you agree we will bring some action back 78 00:05:41,690 --> 00:05:44,010 at a future council meeting for consideration. 79 00:05:44,310 --> 00:05:46,650 But before I hand it over to Kyle, 80 00:05:46,870 --> 00:05:50,230 we've got this presentation essentially broken down 81 00:05:50,230 --> 00:05:51,070 into two pieces. 82 00:05:51,310 --> 00:05:53,130 The first one is going to be a financial piece 83 00:05:54,140 --> 00:05:55,750 that Kyle will walk us through. 84 00:05:56,230 --> 00:05:58,690 Then we'll take a short intermission 85 00:05:58,690 --> 00:06:00,390 and then we'll come back and we'll talk about 86 00:06:01,000 --> 00:06:02,970 some procedural and scheduling things 87 00:06:02,970 --> 00:06:10,270 that we want you to be aware of just as by way of reminder we have a comprehensive plan as you know 88 00:06:10,270 --> 00:06:17,910 Lisa and her team primarily are responsible for walking the city through its update and they are 89 00:06:17,910 --> 00:06:24,050 in the midst of that and we've talked about that at various workshops there have been actions that 90 00:06:24,050 --> 00:06:29,190 have come before you related to that and there will be more as we go forward but the the comprehensive 91 00:06:29,190 --> 00:06:34,530 a plan kind of sets the tone for development, growth, land use, all of those big picture 92 00:06:34,530 --> 00:06:38,390 kinds of planning items, economic development, some other things. 93 00:06:39,430 --> 00:06:43,970 And then we also have, the city has a strategic plan that Council adopted back in 2024. 94 00:06:44,830 --> 00:06:50,850 And as you go through both of those documents, and hopefully you've read at least the strategic 95 00:06:50,850 --> 00:06:56,130 plan recently because we adopted it a year or so ago, the conference plan has been adopted 96 00:06:56,130 --> 00:07:13,950 prior to that several years ago. It's a fairly lengthy document. We're in the process of updating it, but regardless, it's sprinkled with policies and different goals as is the strategic plan with priorities and results. 97 00:07:13,950 --> 00:07:20,490 And so a lot of the language that you see in the comprehensive plans, goals and policies 98 00:07:20,490 --> 00:07:27,110 and in the strategic plans, priorities and results have to do with capital improvements. 99 00:07:27,790 --> 00:07:33,570 And so the purpose of tonight's discussion is to kind of start the dialogue to develop 100 00:07:33,570 --> 00:07:43,550 a more deliberate methodological process for investing in capital assets between now and 101 00:07:43,550 --> 00:07:49,950 the end of the new comprehensive plans horizon, which will end in 2045. 102 00:07:51,010 --> 00:07:56,570 And so with that, I'm going to turn the microphone over to Kyle who is going to start this 103 00:07:56,570 --> 00:08:02,010 evening's discussion with the piece on financing tools. 104 00:08:02,830 --> 00:08:09,330 Again, this is designed to be a dialogue, and so as we go forward, ask questions, talk 105 00:08:10,350 --> 00:08:15,490 and we will go from first part to second part 106 00:08:15,490 --> 00:08:16,490 with an intermission in between. 107 00:08:16,730 --> 00:08:17,430 So Kyle, take it away. 108 00:08:18,070 --> 00:08:18,470 Thanks, Mark. 109 00:08:19,670 --> 00:08:20,710 While Evan pulls that up, 110 00:08:20,710 --> 00:08:22,770 thank you mayor and council. 111 00:08:23,530 --> 00:08:25,890 So yeah, we're going to walk through a handful of slides tonight. 112 00:08:26,050 --> 00:08:31,110 Please interrupt me as I'm talking to talk through digest, 113 00:08:31,650 --> 00:08:35,170 discuss amongst yourselves any of the items contained here. 114 00:08:35,270 --> 00:08:37,190 And I know financing is a dense subject, 115 00:08:37,370 --> 00:08:39,210 but please feel free to interrupt me. 116 00:08:39,210 --> 00:08:45,390 kind of as we're going through this. So without further ado, Evan, can you transfer to the 117 00:08:45,390 --> 00:08:50,490 next slide, please? So I know this is hard to see. So what you have in front of you is 118 00:08:51,990 --> 00:09:00,330 kind of an offshoot of what we put in our budget every year, which is our six-year revenue and 119 00:09:00,330 --> 00:09:08,650 expense forecast. And so this is comprised of all of the funds which can generate capital 120 00:09:09,210 --> 00:09:16,590 revenue for us to tackle things on our six years EFP. And so as you can see, you know, 121 00:09:16,790 --> 00:09:23,110 General Fund, we carry a pretty hefty balance. We started 2025 with $8.5 million in 122 00:09:24,130 --> 00:09:30,230 beginning balance. For the General Fund, it has never been that high. We usually, I would say an 123 00:09:30,230 --> 00:09:38,430 average over the previous six or seven years has been closer to four to six million, I would say. 124 00:09:38,430 --> 00:09:46,530 and so we are beginning 2025 with a very healthy beginning fund balance in the general fund. 125 00:09:46,690 --> 00:09:55,790 We are allocating a significant amount of those resources as a mechanism to deliver 126 00:09:55,790 --> 00:10:01,470 a proposed $5.7 million library project at Legacy Church. And so we've obviously had several 127 00:10:01,470 --> 00:10:06,670 different discussions about what the future of that looks like. Are we going to end up at Town Square? 128 00:10:07,190 --> 00:10:16,750 Are we going to re-engineer any of our existing facilities to accomplish a new library slash community center? 129 00:10:16,950 --> 00:10:23,510 So we have those discussions still upcoming that I'll play a role into what this is eventually going to look like. 130 00:10:23,610 --> 00:10:27,550 I think we're all aware, if you go down, we'll just tackle these kind of one by one. 131 00:10:28,210 --> 00:10:35,110 We did have a significant surplus with the overlap of the retirement of the utility tax and the implementation of the TBD tax. 132 00:10:35,110 --> 00:10:44,470 So we have allocated an interfund transfer of $500,000 from our operating streets fund to our capital streets fund in 2025. 133 00:10:45,770 --> 00:10:52,310 And so we have that obviously earmarked for future horizontal construction within the city. 134 00:10:53,050 --> 00:10:56,070 And then we all know about our retaxes 1 and 2. 135 00:10:57,090 --> 00:11:03,630 You'll see a little bit of a change between especially as we get into 2026 and going forward. 136 00:11:03,630 --> 00:11:10,590 The amount we're able to put away for RE-1 versus RE-2, we have earmarked obviously pre-payment 137 00:11:10,590 --> 00:11:16,930 or repayment, I should say, of the trailhead financing, as well as we do have some operating 138 00:11:16,930 --> 00:11:21,890 costs that live within that fund now, specifically dedicated to capital project delivery. 139 00:11:22,590 --> 00:11:30,110 And so that is a portion of our public works staff, specifically dedicated to execution 140 00:11:30,110 --> 00:11:31,770 of those capital projects. 141 00:11:32,510 --> 00:11:39,010 And as we make our way down, again, you'll see Streets Capital Fund, that's our existing 142 00:11:39,010 --> 00:11:44,470 fund balance that we ended 2024 with and began 2024 with at 720,000. 143 00:11:45,430 --> 00:11:52,230 We have our Harvard Road Impact fees that we earmark usually a project either usually 144 00:11:52,230 --> 00:11:57,230 about every other year within that boundary that we collect those impact fees from. 145 00:11:57,230 --> 00:12:04,570 We've talked about the library capital fund several times over the last year, and that's 146 00:12:04,570 --> 00:12:05,710 where that currently sits. 147 00:12:05,890 --> 00:12:15,590 We'll have $500,000 in 2025 between beginning balance and revenue for that fund as well. 148 00:12:16,130 --> 00:12:18,030 Municipal facilities fund master plan. 149 00:12:18,710 --> 00:12:19,670 So this was set aside. 150 00:12:19,870 --> 00:12:23,590 We will chew through this balance through our master planning activities. 151 00:12:23,590 --> 00:12:31,130 we currently have comprehensive planning, we have Park's master plan, we dedicated a little bit 152 00:12:31,130 --> 00:12:39,190 to our library design towards this as well. And so this is kind of a catch-all for master planning 153 00:12:39,190 --> 00:12:45,150 activities. This fund will eventually be exhausted with our 20-year capital planning activities currently 154 00:12:45,150 --> 00:12:51,930 underway. And finally we have stormwater APA. We completed the stormwater master plan last year. 155 00:12:51,930 --> 00:12:58,550 Here, the discussion on the financing side largely revolved around the potential retirement 156 00:12:58,550 --> 00:13:06,870 of the APA revenue and a corresponding increase in storm water fees, and so we are still keeping 157 00:13:06,870 --> 00:13:09,190 a pulse on what the county eventually decides to do. 158 00:13:10,730 --> 00:13:14,250 I don't want to put you on the spot mark, but if you can remember, are they planning to put 159 00:13:14,250 --> 00:13:16,350 that forward on a ballot this year for renewal? 160 00:13:17,070 --> 00:13:18,310 So that is not understanding. 161 00:13:18,410 --> 00:13:18,530 Okay. 162 00:13:18,530 --> 00:13:26,070 at least is nodding her head. So that is a stay tuned if that passes at the moment no further 163 00:13:26,070 --> 00:13:31,570 need it, no further action needed. If that fails we'll have to pivot, potentially consider 164 00:13:31,570 --> 00:13:36,450 an increase in storm water fees because they largely accomplish the same goal, mitigation 165 00:13:36,450 --> 00:13:45,150 of any materials into the aquifer is largely a storm water function. So you see those two blended 166 00:13:45,150 --> 00:13:53,530 We did very closely together in terms of capital projects that go towards those activities. Yes, Linda. 167 00:13:54,510 --> 00:14:05,230 Just this morning there was an article in the paper that spoke and the city might be putting well, I think they aren't going to go on the ballot to go back into the aquifer protection act. 168 00:14:05,910 --> 00:14:11,650 Okay, so that's not about folks from this morning late breaking news. So council voted 169 00:14:11,650 --> 00:14:16,650 to consider that for a ballot measure for a textbook camp. Yeah, yeah, yeah. So how would 170 00:14:16,650 --> 00:14:22,290 that affect us? I honestly, I, if I looked back through and, and Lisa can comment on that, 171 00:14:22,350 --> 00:14:24,330 I can't, I can't tell you off the top of my head. 172 00:14:30,100 --> 00:14:32,180 Or the county to move forward with the 173 00:14:32,180 --> 00:14:39,460 ballot measure, they really needed an economy of scale in terms of jurisdictions. And 174 00:14:39,460 --> 00:14:44,860 And they needed either the city of the valley or the city of Spokane. 175 00:14:45,080 --> 00:14:51,940 One or the other to participate as it appears right now, it looks like both are going to 176 00:14:51,940 --> 00:14:52,460 participate. 177 00:14:52,460 --> 00:14:58,540 So that actually really reinforces the value of it. 178 00:14:58,540 --> 00:14:59,920 Oh, okay, great. 179 00:15:01,580 --> 00:15:31,360 And I think if memory serves me, that's about a 180 from what we heard last year. So, yeah, that's obviously a positive development that we found out today that I'm finding out right now. So, we will incorporate that going forward, not that that changes anything on here, but that just kind of reinforces that support and that funding stream for years ahead, assuming that ballot measure passes. And so, that encapsulates our current 180 00:15:31,360 --> 00:15:37,120 fund revenue that is attributed to capital projects and we've pushed this obviously out 181 00:15:37,120 --> 00:15:45,340 to 2030. We have a very sparse population of grants and other revenue that is by design. 182 00:15:45,700 --> 00:15:53,600 We are only secured our current SRTC grant for emission avenue overlay of just over a 183 00:15:53,600 --> 00:15:59,740 million dollars. We have several others that we have applied for that we'll get into here 184 00:15:59,740 --> 00:16:04,920 a little bit, but we have not secured them, so we're not including them in this forecast, and so we're 185 00:16:04,920 --> 00:16:09,200 going to, this is kind of the base of operations that we'll operate out of during this discussion, 186 00:16:09,580 --> 00:16:15,420 and so we'll return to this kind of as we go along. And so before we go to the next slide, please 187 00:16:15,420 --> 00:16:22,320 haven't can anybody guess in our current five-year capital facilities plan if we have more or less 188 00:16:22,320 --> 00:16:31,300 than $18.5 million in projects. Next slide please. So the first three rows on here total just 189 00:16:31,300 --> 00:16:39,000 over $32 million and so you can see that obviously that leaves us a deficit of about $13.5 million. 190 00:16:39,780 --> 00:16:45,620 And that's obviously this is this is a very needed discussion to have 191 00:16:47,120 --> 00:17:05,900 But this also assumes that we are not going to get several grants or we're not going to do anything between now and then to address this deficit. We have many tools in the toolbox to address this deficit and we're already taking advantage of some. 192 00:17:05,900 --> 00:17:11,480 And so, if you want to real quick, just go to the next slide, please, Evan. 193 00:17:12,420 --> 00:17:18,000 So we're going to look at sources of funds for a good chunk of our time together today 194 00:17:18,000 --> 00:17:19,400 during our finance review. 195 00:17:19,700 --> 00:17:23,620 And so obviously, the first one when we were looking at Capital Project Delivery, grants 196 00:17:23,620 --> 00:17:23,940 are king. 197 00:17:24,540 --> 00:17:33,160 So it's not free money, but it's free money in the sense that we have excelled in getting 198 00:17:33,160 --> 00:17:37,520 these competitive grants over other jurisdictions that would otherwise use them. 199 00:17:38,180 --> 00:17:45,740 So this is a competition between us and other local governments, districts, to compete 200 00:17:45,740 --> 00:17:51,740 for these funds that are already being collected either at the local, state, or federal level. 201 00:17:52,340 --> 00:17:57,980 And so grants are paramount for us to be able to execute everything that we have on our 202 00:17:57,980 --> 00:17:58,900 five-year CFP. 203 00:17:59,000 --> 00:17:59,260 Go ahead. 204 00:17:59,260 --> 00:18:05,580 question. Yeah. We've always been pretty good about being able to match funds and stuff. 205 00:18:05,720 --> 00:18:10,580 Is that is that been an advantage to us about getting some of these grants? That is huge. And 206 00:18:10,580 --> 00:18:20,080 having that 18.5 to put towards a match puts us in a much better position when the state agencies 207 00:18:20,080 --> 00:18:25,740 or local agencies probably to a lesser extent federal agencies are evaluating applications. 208 00:18:25,740 --> 00:18:29,300 They're getting, and so all of these funds are competitive. 209 00:18:29,660 --> 00:18:31,560 And so we have to stand out somehow, 210 00:18:32,880 --> 00:18:35,780 and letting them know that we have skin in the game 211 00:18:35,780 --> 00:18:39,980 goes a long way for us securing these funds. 212 00:18:40,200 --> 00:18:44,580 And so the big ones that we have are really 213 00:18:44,580 --> 00:18:46,560 on the state level transportation improvement board 214 00:18:46,560 --> 00:18:48,440 is probably the single biggest state agency 215 00:18:48,440 --> 00:18:50,240 that we've been able to take advantage of. 216 00:18:50,480 --> 00:18:53,980 They get a state allocation every biennium 217 00:18:55,060 --> 00:19:06,460 Those are very competitive funds, but we always put together an extremely advantageous 218 00:19:07,340 --> 00:19:12,500 funding package for them to review, and we've been obviously rewarded several times 219 00:19:12,500 --> 00:19:15,120 for that through their awards. 220 00:19:15,540 --> 00:19:20,160 And their award cycle is released, I believe it's every September. 221 00:19:20,160 --> 00:19:25,520 And so when you, Evan, can you go back to our six-year capital forecast back 222 00:19:27,860 --> 00:19:28,160 one more? 223 00:19:28,400 --> 00:19:28,720 Perfect. 224 00:19:29,100 --> 00:19:34,380 And so as you see here, we haven't populated anything outside of the SRTC grant. 225 00:19:34,760 --> 00:19:40,380 We know that we are going to be successful in securing grants past what you see here. 226 00:19:41,100 --> 00:19:49,400 And so we currently have a $937,000 commerce grant towards the construction of the library, 227 00:19:49,700 --> 00:19:51,420 whether it goes through at that site or not. 228 00:19:51,420 --> 00:20:00,240 We have not included that on here, we currently have an application in for a line item appropriation in the state budget. 229 00:20:01,360 --> 00:20:07,980 For a million dollars for a mission avenue, a different mission avenue project that we're anticipating hearing back on. 230 00:20:09,260 --> 00:20:10,220 A couple months. 231 00:20:13,080 --> 00:20:19,620 So we have all of these different opportunities currently being evaluated that's going to 232 00:20:19,620 --> 00:20:20,600 shrink this deficit. 233 00:20:21,200 --> 00:20:27,040 We have several other state agencies that we are going to be aggressive at securing these 234 00:20:27,040 --> 00:20:27,320 grants. 235 00:20:27,500 --> 00:20:36,000 DOT, commerce, ecology, there are programs out there that the city can and will take advantage 236 00:20:36,000 --> 00:20:38,400 of to reduce this deficit. 237 00:20:38,400 --> 00:20:46,860 And so what you see here is not what is going to be the final product in terms of our capital revenue forecast. 238 00:20:47,720 --> 00:20:52,420 On the other side of that, we are currently undertaking and markingly so we'll get into this in a little bit. 239 00:20:53,620 --> 00:21:00,200 Master planning activities that will no doubt elicit other projects that are currently not on our five year CFP. 240 00:21:00,200 --> 00:21:08,420 So this is a constantly ebbing and flowing document that, you know, the goal tonight is just 241 00:21:08,420 --> 00:21:14,960 to give you all of the tools and the toolbox to be able to make the decisions to address these 242 00:21:14,960 --> 00:21:21,680 things as they come up. So let's fast forward Evan to back to our sources of funds. Perfect. Thank you. 243 00:21:22,820 --> 00:21:31,580 So, outside of grants, we do have additional revenue that the city can execute to further 244 00:21:31,580 --> 00:21:35,780 reduce that gap, and one of them was just implemented last year. 245 00:21:35,880 --> 00:21:42,760 So, we do have a TBD sales tax, it's 0.1%, and so that generates roughly $150,000 a year. 246 00:21:42,880 --> 00:21:44,780 We're putting that towards street operations right now. 247 00:21:44,780 --> 00:21:50,700 And so the state allows up to a 0.3%, anything above a 0.1 248 00:21:50,700 --> 00:21:51,720 is taken to the voters. 249 00:21:52,480 --> 00:21:56,240 So if this is eventually deemed 250 00:21:56,240 --> 00:21:59,720 in a more advantageous funding mechanism, 251 00:22:00,220 --> 00:22:02,200 this is one that we can take to the voters, 252 00:22:02,500 --> 00:22:04,120 and they can say yes or no, 253 00:22:04,640 --> 00:22:05,860 and we can proceed accordingly. 254 00:22:05,860 --> 00:22:08,620 That is potentially in increments of one, 255 00:22:09,040 --> 00:22:12,500 an additional 850,000 year or more or less. 256 00:22:12,500 --> 00:22:18,040 We currently have about $340,000 of bank capacity. 257 00:22:18,160 --> 00:22:23,440 We touched on this, especially during the budget process, of a pure councilmatic function 258 00:22:23,440 --> 00:22:26,700 can recoup that difference. 259 00:22:27,760 --> 00:22:34,840 And our current tax per $1,000 of assess valuation is 88 cents. 260 00:22:35,740 --> 00:22:42,020 If we decide to recoup that full $340,000, that would bring us to 97 cents per 1,000. 261 00:22:42,020 --> 00:22:45,080 So we're still under a dollar, which wasn't the case a couple of years ago. 262 00:22:45,360 --> 00:22:50,120 So we have those that are additional revenue streams. 263 00:22:50,280 --> 00:22:55,320 We have, there are programs on the state level that offer very, very low interest loans, 264 00:22:55,620 --> 00:22:57,040 potentially loan-brand combos. 265 00:22:58,140 --> 00:23:11,180 So the state treasury's local program is used to finance real estate and there's one more. 266 00:23:11,180 --> 00:23:32,400 And it escapes me right now, but they have a, but their program is basically a lease to buy program and so you are part of a collective and they charge very low interest public works trust fund. I think we all out and if you don't, we know the current direction of the public works trust fund and it is getting whittled away year after year. 267 00:23:32,400 --> 00:23:37,940 So the ability to take advantage of some of those funds is not what it was a couple of years ago 268 00:23:37,940 --> 00:23:42,720 But the program is still there and if it's advantageous for us to take advantage of that we'll look into that as well 269 00:23:42,720 --> 00:23:44,560 And so go ahead Linda 270 00:23:44,560 --> 00:23:49,220 So how does this public word stress on the work? I mean, where does the money? 271 00:23:50,060 --> 00:23:55,120 So it is so it's a pool that gets allocated again every biennium by 272 00:23:55,800 --> 00:23:59,800 By the state budget adoption and it has been 273 00:23:59,800 --> 00:24:08,920 a source for the state to help balance their budget by grabbing a piece of that every two 274 00:24:08,920 --> 00:24:16,220 years and shrinking that program. And so, in its heyday, it was a phenomenal program. 275 00:24:16,580 --> 00:24:21,420 It still is, but it's just, it doesn't have the reach that it wants to have. And so, but 276 00:24:21,420 --> 00:24:25,700 this is mostly for water sewer, street construction. 277 00:24:25,700 --> 00:24:54,340 It's diminishing in the pool of available funds as diminishing as the state grapples with how they're going to balance their budget. I wouldn't imagine that this program increases anytime soon, so federal loans what we weren't we're not going to get into those if the opportunity arises somehow and it's beneficial for us to cut through the mile of red tape to secure those funds. 278 00:24:54,820 --> 00:25:03,840 will bring that back to you. I'm not optimistic that that's something that we would take advantage of anytime soon. So that's it's there. So we'll just kind of leave it at that. 279 00:25:04,580 --> 00:25:21,960 So the rest of these are going to be these funny track are going to be revolved around what from what I'm hearing what we're going to take to the voters for their consideration for potentially a mixed used library community center. 280 00:25:21,960 --> 00:25:32,240 It can obviously be used for any number of different things for us street improvements all the way to any other capital project delivery that we have. Next slide, please. 281 00:25:33,520 --> 00:25:46,740 And so again, through the lens of we're taking something to the voters, they approve it here is the execution mechanism by which we secure a voter approved bond. 282 00:25:46,740 --> 00:25:53,060 And so we went through this exercise when we were discussing trailhead. 283 00:25:53,860 --> 00:26:00,080 We have publicly issued bonds, those have lower interest rates, higher upfront costs, 284 00:26:00,820 --> 00:26:07,340 banks, they have potentially higher interest rates, lower upfront costs, a quicker mechanism 285 00:26:07,340 --> 00:26:10,080 to execute and have available ones. 286 00:26:10,140 --> 00:26:15,140 And so we'll get into these a little bit, I'm not going to spend a ton of time on this because 287 00:26:15,140 --> 00:26:21,900 will get into the mechanism of what is going to be approval by a valid measure here on the next couple 288 00:26:21,900 --> 00:26:23,260 sites as well. So next slide please. 289 00:26:25,810 --> 00:26:30,150 This is another mechanism by which the city can take a measure 290 00:26:30,150 --> 00:26:38,470 to the voters and this is a levy lid lift is collecting attacks that its maximum statutory levy rate 291 00:26:38,470 --> 00:26:45,430 may ask simply by a majority of voters. It's a 50 plus one. We'll get into that again on the next slide 292 00:26:45,430 --> 00:26:56,430 but this is a mechanism by which the voters approve a mechanism to increase the maximum statutory rate. 293 00:26:57,030 --> 00:27:03,290 Our current taxing rate again is 88 cents per $1,000 of assessed value. 294 00:27:03,590 --> 00:27:12,570 Our maximum statutory is $2.10 for $1,000 and to translate that into dollars we currently collect about $3.2 million. 295 00:27:12,570 --> 00:27:19,630 and property tax every year if a levy lid lift to the maximum statutory rate was approved, 296 00:27:19,630 --> 00:27:23,630 which we're not really going to consider, but it's a tool in the toolbox. 297 00:27:24,990 --> 00:27:32,150 We would collect a maximum of 7.5 annually. So these are mechanisms, again, by which we can 298 00:27:32,150 --> 00:27:39,090 generate funds if needed to close this deficit that we see. Next slide, please. 299 00:27:40,390 --> 00:27:47,710 And so, these are kind of the real world impacts that these would have on our voters and 300 00:27:47,710 --> 00:27:48,990 our residents who approve these. 301 00:27:49,170 --> 00:27:57,430 And so, I'm going to kind of redirect our attention back to if we take a bond or would 302 00:27:57,430 --> 00:28:03,090 take a ballot to the voters to develop Town Square into a library slash community center. 303 00:28:03,090 --> 00:28:09,110 And then we have additional improvements that need to be made to the additional library. 304 00:28:09,290 --> 00:28:11,310 This is a complete swag of $18 million. 305 00:28:11,950 --> 00:28:18,790 This has no basis in anything that our design team is working on right now. 306 00:28:18,970 --> 00:28:21,910 This is just to show you what the potential outcome would look like. 307 00:28:22,530 --> 00:28:29,190 So for financing $18 million, our average annual debt service at the current rates would be over $950,000 a year. 308 00:28:29,190 --> 00:28:37,670 or average annual debt service for $1,026 and the average annual debt service per home would be $133. 309 00:28:39,070 --> 00:28:47,230 So this is items for consideration as we continue to discuss library-sized community center, 310 00:28:47,370 --> 00:28:53,790 development of town square center, if eventual use or sale or anything, 311 00:28:54,570 --> 00:29:00,890 included therein with legacy church, our current city hall building as we build out our master facilities plan. 312 00:29:01,610 --> 00:29:13,490 What you're going to have on the April 1st agenda is an appraisal that council ordered last month regarding city hall, town square and the legacy church building. 313 00:29:14,170 --> 00:29:19,910 And so that's another piece of this that all kind of flows together. 314 00:29:19,910 --> 00:29:24,490 there. Next slide, please, Evan. Well, go ahead, beginnings on slide six. So I just want 315 00:29:24,490 --> 00:29:28,030 to make sure I'm understanding what the slide represents, because you said number, 316 00:29:28,230 --> 00:29:32,290 like the numbers and tonight's kind of a deep topic. So yes, absolutely, yes. 317 00:29:32,590 --> 00:29:41,250 So if nothing else changed, and we funded an $18 million project, nothing else changing, 318 00:29:41,570 --> 00:29:45,770 it would raise my taxes by $133 or anybody else's per. 319 00:29:47,230 --> 00:29:51,250 Correct, per $500,000 of the SES value per year. 320 00:29:54,400 --> 00:29:56,580 That's an additional $133,000. 321 00:29:56,580 --> 00:29:57,340 Correct, yep. 322 00:30:01,170 --> 00:30:29,610 Thank you. Absolutely. That's based on 500. That's based on 500. Obviously, you know, we can reevaluate kind of what the average property of exactly evaluation might be, but you can you can infer any number of different things based on property value that that would attribute to your own personal situation. So, state laws limit general obligation debt. We have gone through this exercise a couple of times as well. 323 00:30:29,610 --> 00:30:37,730 Well, it is good information to have, it is not going to be used to execute any number 324 00:30:37,730 --> 00:30:43,090 of different packages that leave us with $40 million of debt. 325 00:30:43,290 --> 00:30:48,450 This is purely just an exercise to know what our capacity is. 326 00:30:49,130 --> 00:30:55,710 If we do decide to take a ballot measure out to the voters and get it approved, this is 327 00:30:55,710 --> 00:31:01,190 the exercise that is required to make sure that we're within our lawful taxing power. 328 00:31:02,410 --> 00:31:09,630 So the limit is based on our assessed valuation and cities, and so you can see there's several 329 00:31:09,630 --> 00:31:14,710 overlapping characteristics or situations of play here. 330 00:31:14,870 --> 00:31:19,030 So we're just one component of several districts that overlap here. 331 00:31:19,310 --> 00:31:24,970 And so obviously when you get your property tax bill, you see city of liberty like you 332 00:31:24,970 --> 00:31:39,290 You see school districts, you see fire districts, you see EMS, and so these all overlap for a total and it's not to confuse what you see here of $10 per $1,000 of assessed value. 333 00:31:39,930 --> 00:31:48,150 But these individually are the different maximum taxing percentages per that districts assessed value. 334 00:31:48,150 --> 00:31:49,030 Next slide, please, Evan. 335 00:31:50,930 --> 00:31:55,890 And so if you go to each, so the limited tax, 336 00:31:56,090 --> 00:31:58,030 so we have our assessed value of 3.5 billion, 337 00:31:58,290 --> 00:32:03,010 we have our limited tax general obligation capacity of 1.5%. 338 00:32:03,010 --> 00:32:06,670 That's our maximum is 53.6 million. 339 00:32:07,130 --> 00:32:10,650 We currently have 5.6 million that we're paying down on the trailhead note, 340 00:32:11,250 --> 00:32:17,310 along with other leases or heavy equipment that are also counted 341 00:32:17,310 --> 00:32:24,570 against this maximum. So our limited tax general obligation debt usually attributed to property tax. 342 00:32:24,890 --> 00:32:31,570 That's the most common one that you do with limited tax is 47.5 million or 11 percent 343 00:32:32,310 --> 00:32:38,530 we're currently used towards that capacity. So we have unlimited tax general obligation debt, 344 00:32:38,670 --> 00:32:43,550 which you can use sales tax, you can use property tax, you can use any revenue sources towards 345 00:32:43,550 --> 00:32:52,950 That repayment, that per our assess value is $89.5 million, so our current remaining 346 00:32:52,950 --> 00:33:07,890 capacity for unlimited geo-dead is $83.3 million, so that's just, so just to be clear, 347 00:33:07,890 --> 00:33:26,650 So then our borrowing power is $83.3 million for the city. Oh, and so there's there's any number of exercises that get into the absurd. So we own and operate our own parks. So the state allows an additional 2.5% 348 00:33:26,650 --> 00:33:30,730 a statutory maximum for parks as well. 349 00:33:31,530 --> 00:33:34,690 So on top of that, that's an additional 90 million 350 00:33:34,690 --> 00:33:37,090 that the city has that we're not including for this. 351 00:33:38,050 --> 00:33:41,650 And then cities that have utilities have an additional 2.5%. 352 00:33:42,310 --> 00:33:47,470 And so you get into these absurd taxing or debt obligation 353 00:33:47,470 --> 00:33:52,070 ceilings that are really just window dressing. 354 00:33:52,270 --> 00:33:54,630 They're not used for any realistic evaluation. 355 00:33:54,630 --> 00:33:58,170 So you can go ahead and call on people. 356 00:33:58,410 --> 00:33:59,510 Yeah, go ahead. 357 00:33:59,670 --> 00:34:03,450 Um, so paraphrase colonel observation without voter approval. 358 00:34:03,450 --> 00:34:06,910 This council could establish 47 million approximately in debt. 359 00:34:07,210 --> 00:34:10,970 And with voter approval, this city could accrue about eight, 360 00:34:11,070 --> 00:34:12,050 three million in total. 361 00:34:12,170 --> 00:34:12,470 Correct. 362 00:34:12,790 --> 00:34:13,010 Yeah. 363 00:34:16,040 --> 00:34:16,660 Go ahead. 364 00:34:16,900 --> 00:34:18,100 You mentioned the other way. 365 00:34:18,240 --> 00:34:19,960 The city we own our own parks and stuff, 366 00:34:20,100 --> 00:34:21,920 but that dollar amount that equates to that. 367 00:34:22,100 --> 00:34:24,580 Does that also include the trail head, which we own? 368 00:34:24,820 --> 00:34:25,260 Yes. 369 00:34:25,640 --> 00:34:25,840 Okay. 370 00:34:25,840 --> 00:34:30,680 Yep, and that's and that is charged against what you see here as well. So you're lumping that into the 371 00:34:31,820 --> 00:34:36,200 Parks, correct. Oh, we're lumping it into the city. It could be 372 00:34:36,680 --> 00:34:41,100 charged against parts, but this is for our for our discussion. This is a city 373 00:34:41,800 --> 00:34:42,960 own facility check. 374 00:34:43,920 --> 00:34:51,220 Yeah, thanks, Kyle. I just want to say that I appreciate your emphasis and multiple uses of the word absurd. 375 00:34:53,340 --> 00:34:54,020 Thank you. 376 00:34:55,040 --> 00:34:56,220 I appreciate it, yes. 377 00:34:56,340 --> 00:35:02,500 When I go to Macy's and some things on sale, hey, honey, I saved $250, but you spent $750 378 00:35:03,920 --> 00:35:04,980 kind of how it feels. 379 00:35:05,080 --> 00:35:05,200 Yes. 380 00:35:05,500 --> 00:35:06,180 Don't we know that? 381 00:35:06,560 --> 00:35:12,140 So before we move off to this slide, would you clarify again just to make sure that we've 382 00:35:12,140 --> 00:35:21,100 level set that the two numbers in limited and unlimited are only using the first two and 383 00:35:21,100 --> 00:35:21,760 a half percent. 384 00:35:21,760 --> 00:35:31,660 Correct. Yes. So the state provides for up to seven and a half percent. If you own an operator on parks and owner up, operate your own utilities. 385 00:35:32,420 --> 00:35:37,120 So then if we want, if we want to get really wild, let's get crazy. It'd be closer to 200 and 40 million. 386 00:35:38,640 --> 00:35:43,700 But let's, let's, let's, let's leave that there. So next slide, please. 387 00:35:55,320 --> 00:36:05,300 So these are the potential options for if the city ever decides to put a ballot measure 388 00:36:05,300 --> 00:36:09,420 together to tackle any number of things that we've talked about. 389 00:36:09,420 --> 00:36:22,620 I think our latest discussion has revolved again around the potential development of the library at town square and so we'll go through these so you're unlimited tax general obligation bond. 390 00:36:23,620 --> 00:36:30,760 Any term ballot approval rate must be 60% with a 40% validation requirement. 391 00:36:31,500 --> 00:36:37,880 That is very important when we're discussing timing of any potential ballot measure that we put together. 392 00:36:37,880 --> 00:36:49,520 So I would say over the last five years, our general election has always met that 40% validation threshold, none of our specials have. 393 00:36:50,040 --> 00:37:04,980 So we're basically throwing money away if we put this on a special election because we're going to get 25% turnout and regardless, if it is approved by 80% the, the ballot gets tossed. 394 00:37:04,980 --> 00:37:11,460 And so really our only useful mechanism if we're taking a measure to the voters for 395 00:37:12,020 --> 00:37:14,080 these options is the general election. 396 00:37:14,780 --> 00:37:23,980 And so I really take exception to say we're spending money to get information and 397 00:37:23,980 --> 00:37:25,460 give the option to our citizens. 398 00:37:26,400 --> 00:37:27,280 That's pretty good. 399 00:37:28,040 --> 00:37:28,360 Absolutely. 400 00:37:28,520 --> 00:37:29,600 And I don't disagree with that. 401 00:37:29,600 --> 00:37:30,060 Yeah. 402 00:37:30,120 --> 00:37:30,920 It does work out financially. 403 00:37:31,140 --> 00:37:31,260 Right. 404 00:37:31,500 --> 00:37:32,420 I don't disagree with that. 405 00:37:32,420 --> 00:37:41,200 But I think my point was more towards we should only really be shooting for the general action because that gets us the most participation. 406 00:37:43,380 --> 00:37:46,820 So Kyle, the paraphrase in a wild air absurd to use the gesture. 407 00:37:47,200 --> 00:37:51,640 We appoint a special election for decision that we think is really important for the people of our community. 408 00:37:52,480 --> 00:37:59,840 Given that not 40% of the people actually turn out to present a vote regardless of the outcome of the vote, it is irrelevant. 409 00:37:59,840 --> 00:38:06,380 Correct. That's what I heard you said. Correct. So that's 40% of who turned out for the previous general, right? 410 00:38:08,140 --> 00:38:13,420 I would have to clarify that, but yeah. Yeah, it's true. I mean for me that what's what's 411 00:38:13,420 --> 00:38:19,820 emphatic is participation in the vote is is absolutely critical to determine its outcome. 412 00:38:20,600 --> 00:38:23,060 Yeah, absolutely. Yes. That's on a special. 413 00:38:24,540 --> 00:38:28,640 If we appoint an election that has a less than 40% turnout, the vote is a real 414 00:38:30,080 --> 00:38:40,540 That would be special or you've got forbid we get a less than 40% on our general then that same same situation applies that ballot fails no matter what. 415 00:38:40,540 --> 00:38:43,320 Again, that's 40% of the turnout for the previous. Go ahead. 416 00:38:43,380 --> 00:38:56,040 We're only talking about the bond here. If we go for an unlimited bond to councilmember Kennedy's point, you know, we could we could put in advisory vote on any ballot. 417 00:38:56,040 --> 00:39:02,120 if we were sure to. Yes. And that would still tell us whatever we were trying to ask in that advisory 418 00:39:02,120 --> 00:39:08,740 vote. What what you were saying Kyle really specifically to a bond, if we go out for a bond it 419 00:39:08,740 --> 00:39:16,240 is foolish to do it in a February election or in April or on August because the chances of you 420 00:39:16,240 --> 00:39:22,160 getting the 40% are very very low. Correct. So we could we could run a bond vote in one of those 421 00:39:22,160 --> 00:39:25,500 elections, but it would be a waste of money unless we hit the 40 percent. 422 00:39:25,700 --> 00:39:28,240 Correct. Go ahead, Annie. 423 00:39:28,480 --> 00:39:34,880 I have questions about elections. So, I think, I think, at Mayor Bartender said, made sense. 424 00:39:35,440 --> 00:39:39,380 So, talking about February, March, anything off besides a November election. 425 00:39:39,620 --> 00:39:43,500 Correct. Yep. Yeah. So, yeah. So, primary is in August, 426 00:39:44,060 --> 00:39:48,300 specials run, I believe, two other times per year, and then your general is in November. 427 00:39:49,680 --> 00:40:08,620 go ahead, Linda. I think my question is one for Chris. So you're saying that, which 40 or Chris mayor, 40% from the previous general, in other words, as many people. Okay. Gotcha. Okay. So 10,000 people showed showed up and voted at the last general election. 428 00:40:08,620 --> 00:40:12,020 I would need 4,000 people to vote in that next. 429 00:40:12,020 --> 00:40:12,760 Okay, gotcha. 430 00:40:13,100 --> 00:40:13,220 Okay. 431 00:40:13,520 --> 00:40:18,120 And my confirmation was from the county elections official 432 00:40:18,120 --> 00:40:22,700 that evaluated our last five years of specials 433 00:40:22,700 --> 00:40:24,840 and primaries and we did not reach that 40% 434 00:40:24,840 --> 00:40:25,940 threshold at any of them. 435 00:40:28,480 --> 00:40:33,160 So kind of pivoting over to the levy lid lift votes, 436 00:40:33,620 --> 00:40:35,240 limited tax general obligation bond, 437 00:40:35,560 --> 00:40:38,340 obviously levy lid lift is purely narrowly focused 438 00:40:38,340 --> 00:40:46,220 on property taxes. It is limited to nine years and so before I get too far into this, 439 00:40:46,320 --> 00:40:50,960 I do want to let everybody know that we're not going everything that you have in your packet here, 440 00:40:50,960 --> 00:40:54,320 we're not going to present in it. There's an appendix that what you have in front of you 441 00:40:54,760 --> 00:41:01,460 that gets a lot more granular into all of these different potential financing scenarios 442 00:41:02,420 --> 00:41:07,100 that are probably better served for when decisions are made were a little bit further down the road. 443 00:41:07,100 --> 00:41:12,580 So, this is a little bit more high level, given you kind of what the tools are in the toolbox 444 00:41:14,600 --> 00:41:22,700 in terms of, I guess, pivoting back to levy lid lift. It is limited to nine years 445 00:41:23,400 --> 00:41:34,940 for debt financing. You can do a levy lid lift in perpetuity. I really would have a hard time 446 00:41:34,940 --> 00:41:42,520 finding any entity that has actually done that. You have a target for those funds, and once you 447 00:41:42,520 --> 00:41:51,520 use them, the levy lid expires and reverts back to the previous assessed value per 1000. So, 448 00:41:52,680 --> 00:41:58,140 but that said, the ballot approval rate is a simple 50 plus one. There is no validation requirement. 449 00:41:58,140 --> 00:42:05,980 You can run these at different, or I believe it's only in the general, but I have to double check that 450 00:42:07,900 --> 00:42:12,600 That the it is 50 plus one. I have to double check if these can be run 451 00:42:13,440 --> 00:42:18,780 During specials or primaries. I'm pretty sure they can so and so to that point there are 452 00:42:19,980 --> 00:42:20,980 There are timing 453 00:42:22,600 --> 00:42:27,920 situations that play there when you get this information back to the county on when they can start implementing 454 00:42:28,140 --> 00:42:33,720 that lid lift tax. And so a little bit less of a threshold to meet that 455 00:42:33,720 --> 00:42:40,560 levy lid lift and obviously you have with the bond, a lower debt limit for 456 00:42:40,560 --> 00:42:44,780 assessed value for your maximum statutory limited. Next slide please 457 00:42:44,780 --> 00:42:45,000 seventh. 458 00:42:47,390 --> 00:42:54,590 So this so we kind of breeze through that really I think the main focus on 459 00:42:54,590 --> 00:43:02,570 of financing side, this will all kind of mesh with what Mark and Lisa will present to you tonight 460 00:43:02,570 --> 00:43:10,310 as well, is that the city will obviously prioritize grants to the greatest extent. If and when we 461 00:43:10,310 --> 00:43:22,730 determine that additional revenue by way of bank capacity, additional TBD taxing mechanism, 462 00:43:22,730 --> 00:43:33,570 any of those others are prioritized over loans, bonds, anything that requires us to incur for their financing or debt. 463 00:43:34,830 --> 00:43:47,930 And then just the different mechanisms that we already talked about, bonds potentially lower rates, bank loans, lower up from costs, and then what we just talked about with our levied. 464 00:43:47,930 --> 00:43:53,350 And so with that, I guess I'll stand for any questions on the material. 465 00:43:54,030 --> 00:44:00,570 Again, as you review the rest of these, we get a little bit more in the detail on kind of a. 466 00:44:01,630 --> 00:44:06,210 Financing 101 with the rest of the slides that I don't think is necessarily appropriate for tonight. 467 00:44:06,590 --> 00:44:09,130 So and it is fantastic reading material. 468 00:44:12,630 --> 00:44:33,230 Yeah, Kyle. Thank you for the presentation. Just so I kind of understand on the numbers on slide two, you said that that these numbers do include the 5.7 for the development of the legacy church building. 469 00:44:35,190 --> 00:44:40,810 So if I'm looking at this correct, no, did you say next week we're going to have the appraisals back or are we approving? 470 00:44:41,170 --> 00:44:42,910 So we're approving a 471 00:44:43,810 --> 00:44:47,250 commercial real estate vendor to go out and form that work. 472 00:44:47,630 --> 00:44:49,810 That turnaround time will be about four or five weeks. 473 00:44:49,950 --> 00:44:55,430 Okay, so if I'm looking at this correctly, you take that 1342 deficit. 474 00:44:55,430 --> 00:44:59,950 that if we don't build a library, then that... 475 00:45:00,000 --> 00:45:29,800 0.7 comes off the top, right? Correct. And if we were to sell that building, whatever amount we get in proceeds from that building, let's say three, that would bring this deficit all the way down to under 5 million. Potentially, yeah. So there's, and there are, that's a good example. There are almost an infinite amount of different scenarios that can play out between now and 476 00:45:29,800 --> 00:45:35,420 when a lot of these projects are going to come forward to the city that will increase 477 00:45:35,420 --> 00:45:36,860 or decrease that deficit. 478 00:45:37,400 --> 00:45:43,040 And so we have, Evan, if you can kind of return to slide too so we can evaluate that 479 00:45:43,040 --> 00:45:43,780 a little bit further. 480 00:45:45,080 --> 00:45:48,500 Yep, so one before that. 481 00:45:51,440 --> 00:45:59,220 So as we all know, we talked about this before, we began 2025 with $8.5 million in general 482 00:45:59,220 --> 00:46:04,340 a fun beginning balance, that amount was $3.5 million, I think, four years ago. 483 00:46:05,160 --> 00:46:11,280 And so we are generating surplus with revenues that we currently receive, operating revenues 484 00:46:11,280 --> 00:46:14,280 and otherwise, and the expenses that we budget for. 485 00:46:14,500 --> 00:46:20,260 So we budget for revenues to hit a certain mark, they have consistently exceeded that. 486 00:46:20,400 --> 00:46:26,540 We budgeted for expenses to hit a certain mark, we consistently ended the year below that. 487 00:46:26,540 --> 00:46:35,840 That creates surplus as well, and that creates the ability that you see here of us to put $3 million towards a library or any other potential 488 00:46:37,280 --> 00:46:44,080 capital projects that we see. So there are there are hidden opportunities in here to generate additional capital revenue 489 00:46:44,660 --> 00:46:52,900 that I am not comfortable giving you today because I don't know the answer to that. And so again, this is a going this is an ever evolving 490 00:46:54,100 --> 00:46:55,840 document. This is an ever evolving 491 00:46:56,540 --> 00:47:00,520 Um, planning situation that we're bringing you tonight. 492 00:47:00,940 --> 00:47:08,660 So Linda, well, I think when he was a while back, and no, when he was okay, 493 00:47:08,940 --> 00:47:14,240 Kyle, yeah, you had talked about the bond vote being, um, property tax. 494 00:47:14,460 --> 00:47:20,700 Yes. Okay. Well, so Zilebi lived lived, right? So the bond is an unlimited tax general 495 00:47:20,700 --> 00:47:26,220 obligation. So you can use, so for a bond, you can use property tax, you can use sales tax, 496 00:47:26,220 --> 00:47:32,120 you can use all of your different revenues to repay that. Your levy lid lift is a limited tax, 497 00:47:32,340 --> 00:47:39,660 and that is only proper tax. Thanks for the clarification, Linda. Go ahead. Okay, she asked the question 498 00:47:39,660 --> 00:47:56,200 basically. I was going to ask, but okay, never mind. Yeah, that was it. All right. All right, 499 00:47:56,200 --> 00:47:59,240 this constantly being an ebbing-flowing document, 500 00:47:59,540 --> 00:48:01,280 because I think it's important to point that out. 501 00:48:01,380 --> 00:48:05,060 I mean, when I voted for our six-year plan, 502 00:48:05,720 --> 00:48:08,020 you know, I went into it anticipating 503 00:48:08,020 --> 00:48:10,520 that we weren't gonna be able to fund every single thing 504 00:48:10,520 --> 00:48:12,240 right on time with it. 505 00:48:12,280 --> 00:48:12,960 It was going to change. 506 00:48:13,100 --> 00:48:15,120 It was going to, you know, adjust over time. 507 00:48:16,320 --> 00:48:20,500 I do think we should, I know technically it's correct, 508 00:48:20,580 --> 00:48:23,300 but I think it's more accurate to call these 509 00:48:24,960 --> 00:48:31,320 unfunded projects as opposed to a deficit. I think deficit implies that it's 510 00:48:31,320 --> 00:48:36,300 something that we have already allocated for and that we're going to be that 511 00:48:36,300 --> 00:48:41,060 we're going to be searching for and meeting in the next couple of years. And while 512 00:48:41,060 --> 00:48:45,640 obviously these are on our plans, they're not necessarily things that we have to do. 513 00:48:46,120 --> 00:48:49,760 I mean, if we got into a sticky situation, we could cross this one off or we could 514 00:48:49,760 --> 00:48:55,580 across that one off. So I think that's important to point out, if you go to a slide two, 515 00:48:55,780 --> 00:49:02,680 in fact, as I do, thank you. So the 13.4 million on the deficit, or. 516 00:49:02,980 --> 00:49:09,280 I prefer your, as well as funded, is not secure. 517 00:49:09,460 --> 00:49:18,580 If we divided that up by six years, the total of this plan, we're looking at 2.2 million per year, 518 00:49:18,580 --> 00:49:24,420 which is completely doable with the options that we have. 519 00:49:25,520 --> 00:49:29,380 I also want to point out we all got pretty excited 520 00:49:29,380 --> 00:49:33,100 and I saw a lot of eyes go wide open on page 8 521 00:49:33,100 --> 00:49:36,940 when we were talking about how much we could take out if we wanted to. 522 00:49:37,800 --> 00:49:40,760 Specifically the 47 million number, 523 00:49:41,060 --> 00:49:43,500 I mean, just cross off the 83 million, 524 00:49:43,580 --> 00:49:44,720 but the 47 million number, 525 00:49:44,840 --> 00:49:47,700 we're talking about $3900 per citizen 526 00:49:47,700 --> 00:49:54,380 and that we could take out for some sort of bond or debts in the city. 527 00:49:54,460 --> 00:49:58,100 And I don't think anyone around the table wants to do that. 528 00:49:59,600 --> 00:50:03,380 And then there was one other note I was going to make here. 529 00:50:04,720 --> 00:50:07,600 I'll have to come back to it, but those are my initial thoughts. 530 00:50:07,960 --> 00:50:08,120 Thanks. 531 00:50:09,400 --> 00:50:09,940 Anything else? 532 00:50:11,340 --> 00:50:12,220 Hi, next. 533 00:50:12,800 --> 00:50:13,080 All right. 534 00:50:13,240 --> 00:50:13,500 Thank you. 535 00:50:13,740 --> 00:50:14,860 Hold on one second. 536 00:50:14,860 --> 00:50:21,260 And before we break, would you clarify, they've got the appendix in front of them. 537 00:50:21,460 --> 00:50:22,960 We're not going to go through the appendix. 538 00:50:24,000 --> 00:50:31,300 But clarify that it's directly focused on bond tools. 539 00:50:32,140 --> 00:50:37,740 And there are other tools that we've talked about aren't necessarily found in here, although 540 00:50:37,740 --> 00:50:43,840 you would have potentially a comparably dense set of appendices for each of those tools 541 00:50:43,840 --> 00:50:45,900 if we wanted to go to those deaths. 542 00:50:46,320 --> 00:50:53,180 Correct. And so the reason that we have our voter-approved scenarios in here is specifically 543 00:50:53,180 --> 00:51:01,300 revolving around some impending decision regarding the future of the library. And so this obviously 544 00:51:01,300 --> 00:51:07,020 is more tailored to that discussion than us putting together an independent bond package 545 00:51:07,540 --> 00:51:13,260 to go fund $20 million of street improvements. And so this is specifically geared towards 546 00:51:13,260 --> 00:51:16,460 that impending discussion that the city is going to have. 547 00:51:17,600 --> 00:51:21,780 And we can get into as much detail about any of these tools. 548 00:51:22,000 --> 00:51:27,080 Really the purpose of part one was to demonstrate the fact that, and I'm going to use the word 549 00:51:27,080 --> 00:51:35,660 gap versus deficit, there's a gap, and there's a number of ways that we can combine strategies 550 00:51:35,660 --> 00:51:39,960 to close that gap, including controlling the expenditure side. 551 00:51:39,960 --> 00:51:45,080 And so those are all things that over time we're going to need to look at, but we wanted 552 00:51:45,080 --> 00:51:52,880 to just give you a healthy picture of what the available tools that have most within 553 00:51:52,880 --> 00:51:55,240 our reach to address the gap. 554 00:51:55,460 --> 00:51:59,600 And so with that, if there are any other questions, we'll field them here otherwise. 555 00:51:59,840 --> 00:52:05,300 I would recommend that we take a 10 minute recess because this is a lot of numbers. 556 00:52:05,300 --> 00:52:12,320 there's, when we come back, there'll be a quiz. And then we will go into part two and talk about 557 00:52:12,320 --> 00:52:17,880 process. Yeah. Make one more quick comment. I think it's important as we consider what we're 558 00:52:17,880 --> 00:52:28,120 going to be doing with the library in a town square situation that we don't look past that and make 559 00:52:28,120 --> 00:52:35,440 a request or proposal or a package so big that it overwhelms the entire discussion, overwhelms 560 00:52:35,440 --> 00:52:41,060 a public vote, if that's what we're going to do. I mean, I would hate for us to be in a situation 561 00:52:41,060 --> 00:52:48,820 where we could propose a $9 million bond or whatever to fund a town square slash library facility. 562 00:52:49,320 --> 00:52:53,560 But then we look at that 13 million number and say, oh my gosh, we got to do something about 563 00:52:53,560 --> 00:52:58,380 about that, too. So let's make it, you know, 22 million. And then the whole thing just falls apart. Right. Yeah. 564 00:53:00,880 --> 00:53:02,500 All right. We'll be back at 565 00:53:05,300 --> 00:53:05,660 703. 566 00:53:09,680 --> 00:53:16,540 All right. Welcome back, everybody. So we all got a little punchy and a couple of minutes late here. So we're going to go ahead and jump into the second part of our meeting. 567 00:53:17,000 --> 00:53:19,440 Turn it back over to City of Minnesota Mark McAvoy. 568 00:53:19,440 --> 00:53:32,440 Thank you, Mayor. And as Evan is pulling up the slide deck that we have for you, we realize that anytime we're throwing a bunch of numbers at you, that that takes a while. 569 00:53:32,440 --> 00:53:38,440 and so we're not expecting for that to be part of this conversation materially. 570 00:53:39,140 --> 00:53:44,080 Obviously, at the very outset, we're going to talk about pot level. 571 00:53:44,560 --> 00:53:50,320 We'll revisit what we call the gap, just to re-clarify as we go forward. 572 00:53:50,940 --> 00:54:01,620 But really the purpose of the second part of the conversation is to talk about whether or not we have a gap 573 00:54:01,620 --> 00:54:10,860 that is positive or negative, whether we have two projects on the plan, whether we have 25 projects on the plan. 574 00:54:11,540 --> 00:54:30,760 We've recognized for a while we meaning staff and I think council through various conversations both at project approval and at budget development and adoption have had the conversation about and I'll reflect back on some questions that specifically council member curts has asked. 575 00:54:30,760 --> 00:54:32,440 What is the right number, right? 576 00:54:33,080 --> 00:54:39,600 And we've kind of talked about what we need to do and to have an order to bring back the 577 00:54:39,600 --> 00:54:45,080 right number across the various types of infrastructure that we have. 578 00:54:45,760 --> 00:54:54,480 And once we have that, how to manage the program effectively, so that we're delivering the right 579 00:54:54,480 --> 00:54:58,260 level of best in the right place, at the right time for the right reasons. 580 00:54:58,260 --> 00:55:03,960 And so the second part of the conversation focused on those collection, that collection 581 00:55:03,960 --> 00:55:11,040 of things, and so with that, let's dive in, Evan, if you can go, and there's some transitions 582 00:55:11,040 --> 00:55:14,220 in here, just so that we can not be looking at content. 583 00:55:14,960 --> 00:55:20,300 By the way, I've set this so that everyone in the audience can see, and if you're viewing 584 00:55:21,040 --> 00:55:27,540 from the hillside out there, you should be able to read this font, and so as we go through, 585 00:55:27,540 --> 00:55:33,560 there's not a lot of reading here, so I want to just kind of prompt conversation with this. 586 00:55:33,800 --> 00:55:38,660 And so the setting that we want to talk about is both the present and the future. 587 00:55:38,820 --> 00:55:42,760 You heard through Kyle's presentation, that's kind of our position. 588 00:55:42,980 --> 00:55:47,740 That's our financial position. It ebbs and flows based on revenues that come in decisions 589 00:55:47,740 --> 00:55:53,440 that are made about expenditures, opportunities to pursue grants, those types of things. 590 00:55:54,040 --> 00:56:00,180 It's our position and so if you can go to the next slide, Evan, and this is really the 591 00:56:00,680 --> 00:56:09,180 re-visitation of the bulk of Kyle's presentation, just a reset as we go to some process things. 592 00:56:10,000 --> 00:56:13,120 Kyle didn't include some of these line items in there. 593 00:56:13,260 --> 00:56:18,420 I wanted to give you a full picture of if an individual right now goes onto the website, gets 594 00:56:18,420 --> 00:56:23,020 into our budget document goes into the capital facilities plan and goes down to the bottom 595 00:56:23,020 --> 00:56:23,440 right. 596 00:56:23,600 --> 00:56:30,720 They're going to see that number, 32,678,000 in some change as the six-year total of all 597 00:56:30,720 --> 00:56:33,040 of the project estimated costs. 598 00:56:33,720 --> 00:56:38,800 And so from a capital facilities plan perspective, that is the value of those projects. 599 00:56:39,500 --> 00:56:44,160 And it includes things that aren't necessarily tangible assets, right? 600 00:56:44,160 --> 00:56:50,180 it includes some planning efforts. It includes, well mostly planning efforts. And then everything 601 00:56:50,180 --> 00:56:58,400 in the Rose Parks and Public Facilities and above would constitute tangible assets. And so Evan, 602 00:56:58,640 --> 00:57:02,640 if we move on to the next one. Question. Yes, sir. And that's today's button. 603 00:57:02,640 --> 00:57:14,540 But that is in 2025 dollars with a programmed inflation rate of remind me 8%. 604 00:57:31,560 --> 00:57:36,620 So it's $25 plus some inflation rates, correct, correct. 605 00:57:37,360 --> 00:57:43,880 If you look at the funding forecast, and this is what, excuse me, Kyle went through with 606 00:57:43,880 --> 00:57:50,860 With all of the funds that are available that we use for funding capital projects, investing 607 00:57:50,860 --> 00:57:58,160 in capital projects, the estimated revenue for that same period of time is 18.5 million. 608 00:57:58,780 --> 00:58:05,500 And so as we just talked about, there's that gap that we have to close using any combination 609 00:58:05,500 --> 00:58:12,100 of things, identifying new revenue sources, cutting expenditures, essentially removing projects 610 00:58:12,100 --> 00:58:15,200 from the to-do list or other mechanisms. 611 00:58:15,820 --> 00:58:20,980 In addition to that, if you go to the next slide, Evan, 612 00:58:21,780 --> 00:58:24,720 we also have at the end of the CFP, 613 00:58:25,440 --> 00:58:28,140 this potential future projects list, 614 00:58:28,300 --> 00:58:31,860 which up until this year, we call the unfunded projects list, 615 00:58:32,520 --> 00:58:35,160 these do not have costs associated with them, 616 00:58:35,400 --> 00:58:37,520 but they're above zero. 617 00:58:37,520 --> 00:58:46,920 right? So these would add to currently that gap of approximately $14 million or so and that is 618 00:58:46,920 --> 00:58:55,900 for the six year period that is a bit for, it sounds like I'm cutting out again, 25 to 30 and 619 00:58:55,900 --> 00:59:03,580 then you'll see some information as we go downstream that kind of sets this in context for future years. 620 00:59:03,580 --> 00:59:11,360 And so that's all you're going to see with respect to numbers here until a little bit later, 621 00:59:11,620 --> 00:59:13,000 but they're not dollars anymore. 622 00:59:14,520 --> 00:59:16,900 And so really, that is our position. 623 00:59:17,140 --> 00:59:18,380 That's our financial position. 624 00:59:18,560 --> 00:59:19,240 We've talked about that. 625 00:59:19,400 --> 00:59:20,140 You know what that is. 626 00:59:20,260 --> 00:59:22,140 We'll continue to manage that as we move forward. 627 00:59:22,860 --> 00:59:29,360 For the rest of the conversation, we want to shift and start talking about planning, 628 00:59:29,360 --> 00:59:37,260 developing and executing the capital program. And so, again, I'll reiterate whether we have two 629 00:59:37,260 --> 00:59:45,180 projects on the slate or 20 projects on the slate, we want to be able to plan, develop, deliver, 630 00:59:45,460 --> 00:59:52,480 and manage those projects in an integrated strategic effective way. That doesn't mean that we haven't 631 00:59:52,480 --> 00:59:58,040 been doing that. It means we recognize that there's some improvements to be had and tonight's 632 00:59:58,040 --> 00:59:59,980 conversation is to talk to you about what in- 633 01:00:00,000 --> 01:00:29,480 Improvements. We're planning what improvements we've already implemented. And then there's one improvement that we are going to ask you to intervene to create some structure. And we'll talk about that in just a minute. Evan, if you go to the next slide. And before we get any deeper into this, I'll point out that both the public works director and the community development director here, they will be participating and contributing at points along the way. If you have questions as we go through, 634 01:00:29,480 --> 01:00:33,760 this, again, this is meant to be a dialogue. We're all here to help answer that. 635 01:00:33,940 --> 01:00:37,600 I believe Jen Camp is also in the line. She's got a piece of this too on the 636 01:00:37,600 --> 01:00:41,480 implementation side and so we're all available to help answer those questions. 637 01:00:43,120 --> 01:00:49,180 So really, this is framed in the context of the comprehensive plan. The 638 01:00:49,180 --> 01:00:55,300 comprehensive plan is the document or the plan. It resides in a document that has 639 01:00:55,300 --> 01:01:02,160 the longest horizon of any, it's the most forward looking and outward looking of all 640 01:01:02,160 --> 01:01:08,660 of our plans. And it's really made up, implementing it, is made up of both private and public 641 01:01:08,660 --> 01:01:14,280 investment. It's interesting because I believe it's on the, at least it's planned for an 642 01:01:14,280 --> 01:01:20,780 upcoming workshop within the next couple of council meetings to talk about a TIFF-LIFT project 643 01:01:20,780 --> 01:01:27,700 update. That is exclusively on the private investment side. And there are other private investments 644 01:01:27,700 --> 01:01:33,180 that go into this, but we have an update for you that is on the private investment side 645 01:01:33,180 --> 01:01:40,360 when it comes to a particularly capital investment. The remainder of our conversation tonight is going 646 01:01:40,360 --> 01:01:45,420 to be on the public investment side. That's where the city comes in. That's where partners with the 647 01:01:45,420 --> 01:01:52,400 city come in, and we're investing in infrastructure, we're investing in equipment, we're investing 648 01:01:52,400 --> 01:01:58,460 in other types of systems that meet community needs and economic development objectives. 649 01:01:59,820 --> 01:02:06,820 And so focus your attention on the public investment side as we go through, Evan, if you'll 650 01:02:06,820 --> 01:02:08,100 go to the next one. 651 01:02:08,800 --> 01:02:12,920 And we just are kind of talking context here, setting, right? 652 01:02:12,920 --> 01:02:18,880 And so again, the conference of plan is this 20-year horizon, Lisa and her team are in 653 01:02:18,880 --> 01:02:25,820 the process of walking the city through the update, which will be adopted by the end 654 01:02:25,820 --> 01:02:26,560 of 2026. 655 01:02:26,560 --> 01:02:27,840 We talked a little bit about that. 656 01:02:28,220 --> 01:02:31,920 So it takes it out, that plan horizon out to 2045. 657 01:02:32,700 --> 01:02:40,800 And so within this discussion, we're talking about making sure that we have a strategy to plan 658 01:02:40,800 --> 01:02:50,260 developed deliver and fund capital projects investing capital fund over 20-year period out to 2045. 659 01:02:51,280 --> 01:02:58,460 How that relates to the capital facility plan, the comp plan influences and informs the capital 660 01:02:58,460 --> 01:03:03,200 facilities plan and the capital facilities plan implements the comprehensive plan. In the same 661 01:03:03,200 --> 01:03:10,060 relationship the strategic plan is a five-year horizon. This council with a couple of exceptions of 662 01:03:10,060 --> 01:03:15,520 folks that were elected after was adopted went through that process but you've all heard about it. 663 01:03:15,580 --> 01:03:20,540 We've talked about it on numerous occasions. That's a five-year horizon that's talking more 664 01:03:20,540 --> 01:03:27,700 about operations and what the city does to deliver services in that five-year time horizon. 665 01:03:28,180 --> 01:03:32,840 But that's influencing and forming the annual budget and then the annual budget is 666 01:03:33,860 --> 01:03:38,640 implementing the strategic plan. So you have this cycle of things that all are interrelated. 667 01:03:38,640 --> 01:03:43,720 And so that's the context. That's the playing field that we're talking about. 668 01:03:44,400 --> 01:03:49,240 And so Evan, if you go to the next slide, this is where I'm going to ask Lisa to start coming up. 669 01:03:49,800 --> 01:03:53,580 If you look at this a different way, in addition to the comprehensive plans, 670 01:03:53,580 --> 01:03:57,600 our plan, the strategic plan that is currently adopted, 671 01:03:57,660 --> 01:04:02,040 and all of the ones that we would expect to adopt in five-year increments going out, 672 01:04:02,720 --> 01:04:06,140 we've got all of these other master plans that have either been adopted 673 01:04:06,140 --> 01:04:09,760 or in the process of being developed for adoption, 674 01:04:10,420 --> 01:04:12,760 we've got the capital facilities plan that's adopted 675 01:04:12,760 --> 01:04:16,160 and all of the ones that would expect to be adopted 676 01:04:16,160 --> 01:04:18,080 and then your annual budget on the bottom. 677 01:04:18,580 --> 01:04:21,420 This is kind of the landscape of what we're talking about. 678 01:04:21,500 --> 01:04:25,640 So capital investment occurs at the annual budget time, 679 01:04:26,180 --> 01:04:28,900 but it encapsulates all of these other things 680 01:04:28,900 --> 01:04:31,060 that have happened or happened in parallel. 681 01:04:31,320 --> 01:04:33,960 And so Lisa, do you want to describe 682 01:04:33,960 --> 01:04:38,700 how maybe we're going to introduce a new tool to help with this over the long term? 683 01:04:39,200 --> 01:04:44,640 Yeah, so first of all, I just like to talk about the six-year capital facility planning process. 684 01:04:45,040 --> 01:04:48,060 That is mandated. That's the minimum period that you can do it. 685 01:04:48,100 --> 01:04:51,340 It is how you implement your comprehensive plan, absolutely. 686 01:04:52,180 --> 01:04:56,860 And y'all have been a party to at least a few of those along the way. 687 01:04:57,260 --> 01:05:02,120 And as you know, the way we operate now, we're only funding 688 01:05:02,120 --> 01:05:15,660 The projects that are in the budget year were projecting other needs and prioritizing them and trying to anticipate funding sources, etc. 689 01:05:16,520 --> 01:05:30,460 But nearly every year we end up doing some shuffling of projects because suddenly, oh my gosh, the road blew up and now that's a high priority where we thought we had two or three years before we had to get to it. 690 01:05:30,460 --> 01:05:37,980 Those sorts of things happen regularly, or a revenue stream looking at, looking at a 691 01:05:37,980 --> 01:05:45,540 revenue streams, our staff capacity, et cetera, we try and spread that out to make it a 692 01:05:45,540 --> 01:05:48,420 little bit more realistic from an implementation timeframe. 693 01:05:50,320 --> 01:05:58,820 The reality is that as we look at this comprehensive plan, we are going to realize build out in the 694 01:05:58,820 --> 01:06:07,040 20 years. Now is the time to really look at that 20 year capital investment plan to make sure 695 01:06:07,040 --> 01:06:14,380 that we don't miss the opportunity to make sure that roadway is going to meet the growth 696 01:06:14,380 --> 01:06:21,420 that we're going to experience, that we have enough parks to meet the community's vision for what 697 01:06:21,420 --> 01:06:27,880 we should be providing in terms of recreational facilities, et cetera. We have a number of 698 01:06:27,880 --> 01:06:37,200 strategic master plans that are going to help us inform that 20-year plan, but we 699 01:06:37,200 --> 01:06:42,120 really have to think of it as a constrain, a physically constrained plan and 700 01:06:42,120 --> 01:06:47,080 give some thought to how we're going to finance this over the 20-year period. 701 01:06:48,160 --> 01:06:54,500 When we look at a capital facilities plan through a six-year window, it's kind of 702 01:06:54,500 --> 01:06:57,540 like doing financial planning through a keyhole. 703 01:06:58,420 --> 01:07:00,680 You wouldn't wait until six years 704 01:07:00,680 --> 01:07:04,300 before you retire to plan for your retirement. 705 01:07:05,220 --> 01:07:08,260 And so as we look at it, we've got 20 years 706 01:07:08,830 --> 01:07:10,560 to really plan for this build out. 707 01:07:10,700 --> 01:07:12,220 Now is the time we have to do it. 708 01:07:13,960 --> 01:07:16,660 Again, we've just completed this stormwater master 709 01:07:16,660 --> 01:07:21,660 plan, which was a piece of our capital facilities plan. 710 01:07:22,420 --> 01:07:27,060 Ben is leading us through a city facilities planning process. 711 01:07:28,700 --> 01:07:37,440 We just let a contract for a parks master plan and we're working on a solid waste plan. 712 01:07:38,120 --> 01:07:41,740 We also have the pavement master plan, the sidewalk master plan. 713 01:07:42,140 --> 01:07:47,100 We will be doing a transportation network analysis that looks at what is the transportation 714 01:07:47,100 --> 01:07:50,380 infrastructure that we need for this 20 year build out period. 715 01:07:50,380 --> 01:07:53,200 We're taking a very data-driven approach. 716 01:07:53,840 --> 01:07:59,000 The park's plan is going to identify level of service for our population. 717 01:07:59,620 --> 01:08:03,300 PD plans, their services based upon population. 718 01:08:03,900 --> 01:08:11,500 So as we get this data-driven information about what our needs are for this community, 719 01:08:11,740 --> 01:08:17,000 that build out the 20-year capital facilities plan is our implementation strategy. 720 01:08:17,000 --> 01:08:25,560 And it's going to be critical that we look at what we need for the full build out. 721 01:08:25,680 --> 01:08:30,560 If we plan for just the next six years, we get to the end of the six years, and all 722 01:08:30,560 --> 01:08:39,880 of a sudden a big, want slash need of the community that really wasn't right yet for development. 723 01:08:40,200 --> 01:08:44,120 All of a sudden, we don't have the money for it if we haven't taken the time to really 724 01:08:44,120 --> 01:08:49,500 think through how we're going to how we're going to build out this vision. So that's it's an 725 01:08:49,500 --> 01:08:56,600 exciting opportunity for us, but it's also very challenging to be to be able to look that far 726 01:08:56,600 --> 01:09:02,520 into the future. The good news is that with the comprehensive plan, it's not like this is one 727 01:09:02,520 --> 01:09:08,220 and done. We do a 20 year plan. We'll still continue every year to do the six year capital facilities 728 01:09:08,220 --> 01:09:13,740 plan to update it. That's number one. The other thing is that we will be in five years we're 729 01:09:13,740 --> 01:09:23,620 We're looking at where we're at in the implementation of our comp plan and a huge part of that will be where are we in the implementation of our capital facilities plan. 730 01:09:24,500 --> 01:09:26,540 So again, it's an exciting time. 731 01:09:26,740 --> 01:09:38,760 It's an opportunity, but it's also critical that we don't miss this window to be able to really ensure that this community that we can build the community that you all envision. 732 01:09:41,320 --> 01:09:42,760 Any questions for me? 733 01:09:44,700 --> 01:09:48,840 Thanks, Lisa, and Lisa will be back throughout the rest of the presentation. 734 01:09:49,720 --> 01:09:56,140 So as Lisa mentioned, there's a network analysis that would show up in that kind of yellow 735 01:09:56,140 --> 01:09:57,720 shaded area of master plans. 736 01:09:58,340 --> 01:10:02,900 We could add our public art to this, we could add trees to this, we could add IT, we could 737 01:10:02,900 --> 01:10:04,860 add several others. 738 01:10:05,200 --> 01:10:06,700 We didn't have room to put them all. 739 01:10:06,700 --> 01:10:14,300 But you get the idea that all of these things are contributing to and forming and influencing the budget pieces of this. 740 01:10:16,360 --> 01:10:36,480 Evan, if you could go to the next slide. So so with that, that's kind of the landscape. The one of the major questions now that that we're here to answer that we've talked about is what are the capital investments that we're going to need to deliver the required infrastructure to implement the conference. 741 01:10:36,480 --> 01:10:41,680 a plan. That's a question that we all get to participate in. Council gets to make those decisions 742 01:10:41,680 --> 01:10:47,940 as we move through that planning and implementing cycle that we just looked at. Evan, if you could go 743 01:10:47,940 --> 01:10:59,400 to the next slide. So within the planning, well, take it outside of planning in reality. When you're 744 01:10:59,400 --> 01:11:04,740 out in town, driving around town, doing things with your kids, going to the store, or going to houses 745 01:11:04,740 --> 01:11:09,220 of worship, going to various places in the city that you go, you're seeing and interacting 746 01:11:09,220 --> 01:11:14,580 with all of these infrastructure types. And every city has different kinds of infrastructure. 747 01:11:14,580 --> 01:11:21,020 We're not in a position as the city government to own and operate our own water and wastewater 748 01:11:21,020 --> 01:11:25,920 utility. So we don't see pipes and pump stations and all of those kinds of things in here. 749 01:11:26,460 --> 01:11:32,520 But these are the 12 types of infrastructure that we are responsible for owning, operating, 750 01:11:32,520 --> 01:11:35,640 building, constructing, maintaining, improving. 751 01:11:36,500 --> 01:11:43,000 And so some of these are new in terms of type and we've carved them out as individual 752 01:11:43,000 --> 01:11:48,380 types because we think they're important enough to isolate so that we can invest in them 753 01:11:48,380 --> 01:11:49,520 transparently. 754 01:11:50,200 --> 01:11:56,600 But as we go forward and we build the capital facilities plan going forward, if you remember 755 01:11:56,600 --> 01:12:03,240 the slide where I showed you the value of the projects, there were four categories of projects. 756 01:12:03,900 --> 01:12:10,360 Going forward, you're going to see these in their own categories so that you see exactly what 757 01:12:10,360 --> 01:12:19,640 the investment is and what the plan projects are to deliver that investment. And so as we go through 758 01:12:19,640 --> 01:12:26,080 the rest of this, we'll be looking at examples from each of these types but not examples from all 759 01:12:26,080 --> 01:12:31,760 of these types. So if you have a question on a future slide when we're going through an example 760 01:12:31,760 --> 01:12:38,040 about a type that we're not using as an example, ask it. We can get into that. We just only have 761 01:12:38,040 --> 01:12:43,400 a limited number of examples because we don't want to be here for four hours. So Evan, if you go to 762 01:12:43,400 --> 01:12:50,980 the next slide, the second major question that we need to ask and we have asked and we're going to 763 01:12:50,980 --> 01:12:55,300 talk to you about for the remainder of our time together tonight is what is the most effective strategy 764 01:12:55,300 --> 01:12:59,420 for planning, funding, and delivering that required infrastructure. 765 01:13:00,100 --> 01:13:04,320 And so the rest of what we talk about this evening is going to be answering or helping 766 01:13:04,320 --> 01:13:05,340 to answer that question. 767 01:13:06,200 --> 01:13:12,720 And so, Evan, if we go to the next section header here, and really the answer is we have 768 01:13:12,720 --> 01:13:20,680 to be better at integrating all of those things that we showed you on that kind of gant looking 769 01:13:20,680 --> 01:13:26,580 chart earlier with all the plans laid out over time. Some of the things that we are going 770 01:13:26,580 --> 01:13:30,780 to talk to you about tonight and show you examples of have already been implemented. 771 01:13:30,980 --> 01:13:34,840 We are already doing these things. Some are in the process of being implemented and like 772 01:13:34,840 --> 01:13:40,140 I mentioned at least one of them or one of them will need a council action to implement 773 01:13:40,140 --> 01:13:46,020 and we'll talk about that a little bit downstream. All of these things in some way or another 774 01:13:46,020 --> 01:13:52,860 are best practice. And so we want to incorporate best practice into our management of the capital 775 01:13:52,860 --> 01:13:58,360 program for the city. And so Evan, if you can go to the next one, this is a re-visitation 776 01:13:58,360 --> 01:14:04,500 of what we just saw and I am putting it up there just to kind of remind everyone on an annual 777 01:14:04,500 --> 01:14:11,420 basis the cadence of all of this is the annual budget process. So all of, you know, regardless 778 01:14:11,420 --> 01:14:17,100 Regardless of what's in each of these plans, the budget is appropriated on an annual basis. 779 01:14:17,340 --> 01:14:22,900 And so everything from the comprehensive plan down through the strategic plan is informing 780 01:14:22,900 --> 01:14:30,000 and influencing and in effect dropping projects down that are being approved and dollars 781 01:14:30,000 --> 01:14:34,440 being appropriated to implement those and execute those in an annual budget cycle. 782 01:14:35,000 --> 01:14:39,920 So when you look at and talk about integration, we're kind of talking about it in this red 783 01:14:39,920 --> 01:14:46,240 band, right? We were in that red band moves each year to the right. And so we're integrating 784 01:14:46,240 --> 01:14:52,960 better, more effectively, more strategically, but we're doing it in one-year cadences as 785 01:14:52,960 --> 01:14:57,560 we develop and adopt the annual budget. Next slide, Evan. 786 01:15:01,260 --> 01:15:10,980 Lisa mentioned one of these already. This is as we talk about how to do, what is better integration 787 01:15:10,980 --> 01:15:16,820 mean? Well, the things in the back and the squares are our goals. These are the goals that 788 01:15:16,820 --> 01:15:23,720 we want to keep in front of us as we're doing these things, as we're better integrating 789 01:15:23,720 --> 01:15:28,640 the capital program. We want to spend more attention on data-driven decision making. 790 01:15:30,940 --> 01:15:31,480 We'll 791 01:15:31,480 --> 01:15:33,260 downstream in some of these other slides. 792 01:15:33,820 --> 01:15:35,820 We want to do a better job of collaborating 793 01:15:35,820 --> 01:15:37,460 with our partners and coordinating 794 01:15:37,460 --> 01:15:39,580 with different bodies like council, 795 01:15:39,700 --> 01:15:41,120 like the Planning Commission and some others. 796 01:15:41,840 --> 01:15:44,540 We want to keep in mind that in some ways, 797 01:15:44,800 --> 01:15:47,900 and Lisa's team is going through this in part right now 798 01:15:48,280 --> 01:15:49,760 with policy and code alignment. 799 01:15:50,040 --> 01:15:51,680 We're updating the comprehensive plan. 800 01:15:52,160 --> 01:15:54,940 We're also updating the sign code. 801 01:15:56,100 --> 01:15:58,880 And over time, we'll be looking at various codes 802 01:16:00,080 --> 01:16:05,060 to bring into alignment that help us with better integration of this. 803 01:16:05,540 --> 01:16:09,480 And then we want to engage and be more transparent about all of this. 804 01:16:10,000 --> 01:16:14,040 And so those are the goals that we're going to keep in mind for all of these pieces of the process. 805 01:16:14,120 --> 01:16:19,780 The process is in the middle, right? This is what we're going to do in that annual cycle. 806 01:16:20,200 --> 01:16:22,980 We're going to measure things, we're going to analyze them, and we're going to perform. 807 01:16:23,460 --> 01:16:27,080 And we'll talk about each of those in the context of all of these goals. 808 01:16:30,040 --> 01:16:36,680 And I'll say before we move on, don't think of any of these as having like hard boundaries, 809 01:16:37,460 --> 01:16:37,560 right? 810 01:16:37,700 --> 01:16:38,560 All of these overlap. 811 01:16:39,120 --> 01:16:45,220 There's no, it only fits in one of these slices or it only fits in one of these boxes. 812 01:16:45,780 --> 01:16:49,920 They all touch one another, they all enter play with one another. 813 01:16:50,540 --> 01:16:54,560 This is just an illustration to kind of bring the point home of what we're going to be doing 814 01:16:54,560 --> 01:16:58,800 and that's the universe that we're going to be doing this in. 815 01:16:59,400 --> 01:17:00,240 Evan, next slide, please. 816 01:17:00,880 --> 01:17:06,280 So first, the first phase of this is we're going to be doing measuring. 817 01:17:07,020 --> 01:17:11,760 Councilmember Kurds, to answer that question that has been asked multiple times, what is 818 01:17:11,760 --> 01:17:12,220 the number? 819 01:17:12,580 --> 01:17:16,360 Well, this measurement is going to get us there. 820 01:17:17,220 --> 01:17:21,880 And that's really, there are a couple of things that are major headliners here that we're 821 01:17:21,880 --> 01:17:28,460 talking about from a measurement perspective, one is a functional assessment and then two is 822 01:17:28,460 --> 01:17:34,780 ongoing needs. We can think about ongoing needs, what we used to call the unfunded projects. 823 01:17:35,500 --> 01:17:42,140 That's what ongoing needs is and we developed that on an annual basis. But we're going to do it 824 01:17:42,140 --> 01:17:48,200 with all of those goals in mind. So to talk about the functional assessment part of this and why 825 01:17:48,200 --> 01:17:52,280 It's important and what it's going to look like and what it will yield to us 826 01:17:52,280 --> 01:17:57,060 Ben Turner is going to come up and share some information with you about that Ben 827 01:17:57,060 --> 01:17:57,900 All 828 01:18:04,140 --> 01:18:07,020 right, so I've got I've got some more numbers here, but I did color code them 829 01:18:07,020 --> 01:18:09,380 So they're a little easier to tell what's good and what's bad? 830 01:18:10,480 --> 01:18:10,920 So 831 01:18:11,680 --> 01:18:16,900 This is just a scale that I had put together Mark and I've been talking about this for a few months 832 01:18:17,540 --> 01:18:19,760 It basically just uses a 100 scale 833 01:18:19,760 --> 01:18:36,240 You can see that we have a few of the category infrastructure types that market listed earlier here. These are probably the five most of the most value that the city has they go kind of descending order by value. So the bad news is the red ones are the more expensive ones. 834 01:18:37,000 --> 01:18:46,020 But this goes into kind of basically three different types of just kind of categorizing our facilities condition. 835 01:18:46,020 --> 01:18:53,160 We really have a little bit more information on condition just because we've already invested an asset management software with asset builder. 836 01:18:53,700 --> 01:19:05,480 I pulled some of this data from there. Some of it is just me kind of eyeballing what I can see because we still have some assessment tools that are coming into play this year that are going to give us a more home score specifically on streets. 837 01:19:06,300 --> 01:19:11,680 Parks will get a little bit from the parks master plan storm water is going to get looked at when we're doing the streets. 838 01:19:11,680 --> 01:19:16,520 So those numbers will, we'll, we'll hone a little bit better, a little bit less of an eyeball 839 01:19:16,520 --> 01:19:22,720 testing, more of the actual data driven approach. What we have been missing is more the configuration, 840 01:19:23,060 --> 01:19:29,060 the capacity. So configuration, for example, streets, we just did a new turn lane for Opelway. 841 01:19:29,460 --> 01:19:33,260 That would be an, that would be an example of a configuration change that would increase that score 842 01:19:33,260 --> 01:19:39,320 for streets. For facilities, we're sitting in a really bad example of configuration in city hall 843 01:19:39,320 --> 01:19:44,320 here. This facility was not built to house the city hall was built for another purpose. 844 01:19:44,900 --> 01:19:50,500 So we've made our may do configuration wise to make sure that the city this facility 845 01:19:50,500 --> 01:19:54,140 meets the needs of the city all needs, but it just doesn't meet a configuration and kind 846 01:19:54,140 --> 01:19:59,480 of how the spaces are both in size and how they're arranged to be an efficient facility. 847 01:20:00,060 --> 01:20:04,400 The numbers in parks and stormwater are mostly green. We don't have a lot of assessment tools 848 01:20:04,400 --> 01:20:08,060 but for the most part configuration and capacity, those are usually going to be high unless you're 849 01:20:08,060 --> 01:20:12,880 missing a service in the parks, like a dog park, or a disc golf course, things like that. 850 01:20:12,940 --> 01:20:17,240 That would probably, if those were things that we really needed to have and made the decision 851 01:20:17,240 --> 01:20:20,100 that would lower our configurations for having done that yet, but that was just something 852 01:20:20,100 --> 01:20:23,400 I was thinking about as those kind of going through, that's more services that aren't missing 853 01:20:24,120 --> 01:20:27,480 from those different types, and then capacity really just size. 854 01:20:28,840 --> 01:20:33,900 When we talked earlier about the facility master plan, we've identified a deficit and square 855 01:20:33,900 --> 01:20:37,860 footage for facilities, for roads, it could be winding roads, adding lanes, things like 856 01:20:38,520 --> 01:20:42,820 that. And then for the other ones, it's really just, or those regular capacity issues. And 857 01:20:42,820 --> 01:20:47,320 then I had to make some educated guesses on the average ages of some of our types that 858 01:20:47,320 --> 01:20:50,740 will hone as we get through some of these more assessment tools that tell us, because we just 859 01:20:50,740 --> 01:20:55,140 don't know in certain roads we built. We don't have those records available, because most of 860 01:20:55,140 --> 01:21:01,760 the more built before the city existed. So those, this will continue to get better as we 861 01:21:01,760 --> 01:21:05,400 go through and assess that, go through that assessment cycle. 862 01:21:08,340 --> 01:21:12,860 The other things, like I said, the assessment tools that we're coming on this year, we've 863 01:21:12,860 --> 01:21:17,580 got the sidewalk scan coming this July, the street scan this July, the parks master plan, 864 01:21:17,780 --> 01:21:22,040 the storm water plan has already given us some data that we can incorporate in this functional 865 01:21:22,040 --> 01:21:22,500 assessment. 866 01:21:23,020 --> 01:21:26,160 And then this can hone down if we go to the next slide, I believe. 867 01:21:27,180 --> 01:21:29,420 It breaks down into more streets and structures. 868 01:21:29,740 --> 01:21:31,340 So we haven't filled in the lane miles. 869 01:21:31,340 --> 01:21:42,540 We've calculated that we do have 54 lane miles in the city. We haven't broken those down by a chair collector. I can find that data pretty quickly, but the most part breaks us down into it. 870 01:21:42,960 --> 01:21:49,260 And we could break down arterial versus collectors versus residential and score those the same way that you see here. 871 01:21:53,920 --> 01:21:55,740 54 that sounds really low. 872 01:21:55,740 --> 01:21:55,840 Oh. 873 01:21:56,960 --> 01:21:59,520 That was the calculation that we just completed 874 01:21:59,520 --> 01:22:01,420 with the GIS focus of the street logic. 875 01:22:01,680 --> 01:22:02,040 Interesting. 876 01:22:02,220 --> 01:22:04,960 So within six square miles, we have 54 landpots. 877 01:22:06,000 --> 01:22:08,120 That does not include private streets. 878 01:22:09,140 --> 01:22:11,900 So like Legacy Ridge was in the calculation things like that. 879 01:22:12,060 --> 01:22:13,260 Those are just public streets at the city. 880 01:22:13,480 --> 01:22:13,960 Oh, it's got to. 881 01:22:16,080 --> 01:22:17,640 All right, next slide, please. 882 01:22:18,300 --> 01:22:20,380 So this is just a chart that's OK. 883 01:22:20,580 --> 01:22:24,520 So on the left side, you can see the same color codes 884 01:22:24,520 --> 01:22:30,580 that I showed you earlier. This is an overall street infrastructure in 2026. It kind of shows how 885 01:22:30,580 --> 01:22:37,160 much of the streets have a failing grade of under 70. And then as you can see here, as we 886 01:22:38,220 --> 01:22:42,400 have assets, they degrade if you don't, but it's just like owning a house. If you don't maintain 887 01:22:42,400 --> 01:22:48,020 the house, it gets kind of dingy after a while. Your driveway starts breaking down. You can get the 888 01:22:48,020 --> 01:22:52,420 corners of your, you know, around your house. The paint starts chipping away as the kids run into 889 01:22:52,420 --> 01:22:57,020 things like that, your water heater, only has a lifespan of so long. Your roof needs to get 890 01:22:57,020 --> 01:23:01,700 replaced every, you know, so many years spent on what kind of roof you have. So no investment, 891 01:23:02,040 --> 01:23:07,700 you obviously degrade, grade, grade, grade. And we have assets in the city that have done that 892 01:23:07,700 --> 01:23:12,720 over the years. Even the maintenance was deferred or for whatever reason. And then on the left, 893 01:23:12,720 --> 01:23:16,540 on the right here, we've got the more strategic investment where you go and tackle those failing 894 01:23:16,540 --> 01:23:23,960 facilities or infrastructure types and you invest in it prudently and in the right places to 895 01:23:23,960 --> 01:23:30,060 maintain a higher level of facility condition capacity and condition. 896 01:23:33,820 --> 01:23:36,760 And so and before we move 897 01:23:36,760 --> 01:23:48,560 off of this one this this type of analysis will also allow us on an annual basis to consider some of 898 01:23:48,560 --> 01:23:52,220 those tools that Kyle mentioned in part one, right? 899 01:23:52,960 --> 01:23:55,960 And this isn't to say one is better than the other. 900 01:23:56,380 --> 01:24:00,000 This is to say whatever is incorporated 901 01:24:00,000 --> 01:24:02,720 into this strategic investment side, 902 01:24:03,540 --> 01:24:06,440 you can see, and this is thus far, 903 01:24:06,540 --> 01:24:10,140 this is a hypothetical example based upon the eyeball test, 904 01:24:10,440 --> 01:24:13,460 we're gonna confirm all of this with the actual data. 905 01:24:14,360 --> 01:24:16,000 But you see the strategic investment, 906 01:24:16,000 --> 01:24:23,360 regardless of the tool helps to improve the functional assessment, so you're preserving and 907 01:24:23,360 --> 01:24:29,920 prolonging the life of the asset. Before we move on to the next one, Evan, if you would back up 908 01:24:30,720 --> 01:24:35,200 to the previous slide, I wanted to point out one other thing. This is where I was mentioning 909 01:24:36,140 --> 01:24:44,320 each of these types that we talked about. It's going to have its own collection of attributes that 910 01:24:44,320 --> 01:24:52,140 you're measuring and coming up with scales to evaluate. There's level of service in there. 911 01:24:52,220 --> 01:24:59,020 There's all kinds of different attributes that each of these types is going to have uniquely 912 01:24:59,020 --> 01:25:08,780 attributed to it. And so as you're analyzing those and you're using the data to help inform the 913 01:25:08,780 --> 01:25:17,880 decision, you're able to standardize and objectify the comparison. So if you're comparing 914 01:25:17,880 --> 01:25:28,660 a street to a tree, some would find there to be some difficulty in objectively comparing 915 01:25:28,660 --> 01:25:35,600 those things. This is designed to help do that on a level playing field across time. 916 01:25:37,880 --> 01:25:38,760 And 917 01:25:38,760 --> 01:25:46,160 of having these functional assessments per asset type so that we can make objective comparisons. 918 01:25:46,760 --> 01:25:56,080 Can I ask you a quick question? Sure. The red lines on our streets here are not corresponding to 919 01:25:56,080 --> 01:26:02,140 the critical number. No, sir. So that basically indicates all of our, I believe that's all our 920 01:26:02,140 --> 01:26:07,040 arterials. Yeah. Okay. I just wanted to make sure that it was clear. One thing that we will have, 921 01:26:07,040 --> 01:26:09,980 but we've just started kind of the software process with the street scan 922 01:26:09,980 --> 01:26:16,420 folks is they will give us a map that has those color codes based on what they found during the scan. 923 01:26:17,020 --> 01:26:22,240 They also were letting us know that as we go and fix a top hole and we plug that in, 924 01:26:22,560 --> 01:26:25,320 it will automatically change our school for that particular section. 925 01:26:25,720 --> 01:26:29,900 Okay, so well yeah, it'll look like that, but it'll have multiple colors and things like that. 926 01:26:30,340 --> 01:26:34,500 So we'll be able to see exactly where the red parts of the city are that we need to focus on. 927 01:26:40,300 --> 01:26:47,960 So where we're showing you aggregated estimates, we'll be able to break down each segment 928 01:26:48,490 --> 01:26:53,460 and show you its condition and essentially functional assessment by segment. 929 01:26:54,220 --> 01:26:58,660 And so that becomes extremely valuable when we talk about defining ongoing needs and then 930 01:26:58,660 --> 01:27:00,160 ultimately prioritizing things. 931 01:27:00,160 --> 01:27:07,020 And are there any other questions at this juncture before we move on to the next slide? 932 01:27:12,610 --> 01:27:16,630 Evan, if we can go down to the next one, that one. 933 01:27:17,330 --> 01:27:22,290 So again, going back to the, and then hang out for a little bit just in case some of this 934 01:27:22,290 --> 01:27:23,370 generates some questions. 935 01:27:24,050 --> 01:27:32,850 So going back to the higher level, the whole collection of infrastructure types, when we're 936 01:27:32,850 --> 01:27:39,330 We're looking at using other kinds of data to help make strategic investment decisions. 937 01:27:39,870 --> 01:27:43,630 One of the things, and this has been maybe a year ago, maybe a little longer than a year 938 01:27:43,630 --> 01:27:49,650 ago, we invested in something called RGIS Urban, and so we upgraded our GIS capability. 939 01:27:50,810 --> 01:27:55,870 And so what we expect, as a return for that, is to be able to use that, and so for each 940 01:27:55,870 --> 01:27:59,990 of the types that we have here, we'll have this functional assessment, we can map it. 941 01:27:59,990 --> 01:28:02,410 We have all of these other data layers. 942 01:28:02,830 --> 01:28:05,130 We have zoning, we have development projects. 943 01:28:05,410 --> 01:28:07,050 We can put anything on there that we want to. 944 01:28:07,590 --> 01:28:11,110 And when you start stacking these things on top of one another 945 01:28:11,110 --> 01:28:16,970 and putting this need in place based on this assessment, 946 01:28:17,410 --> 01:28:20,350 you start seeing pinholes where you say, 947 01:28:20,410 --> 01:28:21,770 okay, that's where I need to invest. 948 01:28:22,450 --> 01:28:24,630 That's a problem that needs to be corrected immediately. 949 01:28:24,930 --> 01:28:27,710 And then you can prioritize in a much more effective way 950 01:28:27,710 --> 01:28:37,410 because you're using data from a 360 degree view from all perspectives to help to identify opportunities 951 01:28:37,410 --> 01:28:44,730 and to prioritize investment. So you're maximizing the dollars that you do have and that gap becomes less consequential 952 01:28:44,730 --> 01:28:50,610 because you're getting more for each dollar. And so that's part of this strategy is to do it better, more effectively, 953 01:28:50,870 --> 01:28:55,990 more strategically. This is just an example of the layers that we would be using, but you get the point. 954 01:28:55,990 --> 01:29:00,890 you're laying them on top of each other and effectively seeing what shines through and those are 955 01:29:00,890 --> 01:29:06,870 your opportunities to prioritize where you're spending your dollars. Lisa, is there anything you'd 956 01:29:06,870 --> 01:29:12,430 like to add regarding the GIS piece of this or any of this strategy been, any comments you'd 957 01:29:12,430 --> 01:29:18,310 like to add here? I mean I think the only comment, this is really we're getting closer to the industry 958 01:29:18,310 --> 01:29:23,650 standard for how these things are done. I mean most of the stuff you saw here I used when I was in 959 01:29:23,650 --> 01:29:28,010 maybe this is how the federal government does their strategic facility investment. 960 01:29:28,550 --> 01:29:33,570 I mean they got up in like mission with like airplanes and things but we don't have 961 01:29:33,570 --> 01:29:38,650 to worry about but yeah this is this is getting very close to where the rest of the world does 962 01:29:38,650 --> 01:29:41,410 this kind of thing. And larger cities and like that. 963 01:29:41,410 --> 01:29:51,910 The process to get this implemented requires me to understand how this means, staff and 964 01:29:51,910 --> 01:29:58,630 against you, but as far as the system really is, it's a power to fear, for us to be in 965 01:30:00,050 --> 01:30:24,770 So, I expect most of the functional assessment stuff, at least on my end, to finish up by the end of this calendar year. We do have the street scan schedule for July, takes literally, usually two to three months to analyze those millions of data points that they're going to be taking. So, unfortunately, we won't be able to use it as much for this next CFP, but it will, it'll read massive benefits in the future. 966 01:30:27,570 --> 01:30:31,430 All right, and so that's, so we have all of that data. 967 01:30:31,430 --> 01:30:36,830 Yeah, we have all of our team has access to that, we're using it. 968 01:30:37,410 --> 01:30:43,310 So we're using that then on an annual basis to build our ongoing needs assessment, which 969 01:30:43,310 --> 01:30:49,630 essentially is the annual process whereby department heads are using this data to define 970 01:30:50,270 --> 01:30:54,750 capital needs that they're submitting as part of the budget process. 971 01:30:55,050 --> 01:30:59,890 So from that going back to the measure slice, right, we're talking about this functional 972 01:30:59,890 --> 01:31:07,130 assessment using the functional assessment to inform the ongoing needs, which are submitted 973 01:31:07,130 --> 01:31:11,950 on an annual basis, okay? So they're submitted, they're sitting there, they're on a list, 974 01:31:12,350 --> 01:31:18,150 we're looking at what happens next. Evan, if you can go to the next slide. So we move from 975 01:31:18,150 --> 01:31:24,810 the measure slice to the analyze slice. And in this phase of the process, we're validating 976 01:31:25,830 --> 01:31:28,710 and prioritizing, again, keeping all of these goals in mind. 977 01:31:29,130 --> 01:31:30,870 We're doing all of this all the time. 978 01:31:35,480 --> 01:31:42,520 And so, you know, here's where we have this strategic investment analysis. 979 01:31:43,000 --> 01:31:46,000 If you want to look at it, that's what we're originally calling this workshop. 980 01:31:47,280 --> 01:31:51,740 That's really more appropriate to say, at this stage of the game, 981 01:31:51,940 --> 01:31:55,040 we're producing a strategic investment analysis 982 01:31:55,040 --> 01:31:59,520 this using the validation and prioritization steps here, right? 983 01:32:00,640 --> 01:32:03,340 So, how is this happening and when is it happening? 984 01:32:04,260 --> 01:32:06,300 Evan, if you can go to the next slide. 985 01:32:07,220 --> 01:32:12,280 So, here is how we're proposing for that to occur. 986 01:32:13,680 --> 01:32:16,760 And this also addresses the who. 987 01:32:17,780 --> 01:32:24,040 And this also is where we're going to ask counsel to take action 988 01:32:24,040 --> 01:32:32,820 to create something and so at this stage we're proposing that there's a steering 989 01:32:32,820 --> 01:32:38,040 committee that does this validation and prioritization. We've already created 990 01:32:38,040 --> 01:32:43,000 what we're calling the capital program office that's internal to the city that's 991 01:32:43,000 --> 01:32:47,800 made up of all of our departments we meet and have been meeting monthly to kind 992 01:32:47,800 --> 01:32:53,220 of manage the capital program. We're proposing that the council create an advisory 993 01:32:53,220 --> 01:33:01,320 board to go along with us in parallel in this exercise, which would consist of members 994 01:33:01,320 --> 01:33:04,760 from the Planning Commission, the Parks and Arts Library Board, Community Engagement 995 01:33:04,760 --> 01:33:06,500 Commission, and then an at-large appointment. 996 01:33:07,720 --> 01:33:15,400 And so we would work in conjunction to validate the data and the ongoing needs assessment, the 997 01:33:15,400 --> 01:33:20,820 requests, and then prioritize the proposed investments on an annual basis. 998 01:33:22,160 --> 01:33:28,080 And so, Evan, if you can go to the next slide, excuse me, the idea is to have one representative 999 01:33:28,080 --> 01:33:29,200 from each of those departments. 1000 01:33:29,940 --> 01:33:34,620 So we, yeah, we would recommend that they would not be named individuals. 1001 01:33:37,420 --> 01:33:45,460 Because as the, as the membership of those boards changed, they could make the decision of who would sit on the advisory board by some action of that board. 1002 01:33:45,460 --> 01:34:05,630 But it would be a representative from each of those commissions and then an at-large representative from somewhere else in the community, okay, and so the I'm calling this the new annual cycle, because again, remember the cadence of all of this is the annual budget development cycle. 1003 01:34:05,630 --> 01:34:12,470 So we, to make this more meaningful, Evan, go to the next slide and then we're going to backtrack. 1004 01:34:13,410 --> 01:34:21,010 The old or the current cycle is that in October, departments submit needs and in November and December, 1005 01:34:21,330 --> 01:34:26,170 the budget development process happens and the staff brings that to the city council. 1006 01:34:26,730 --> 01:34:32,810 We have a workshop, we have a public hearing and we have two ordinance reviews and then the budget is adopted. 1007 01:34:32,810 --> 01:34:37,770 And that's not to say that there is a conversation and dialogue as that's happening, but it starts 1008 01:34:37,770 --> 01:34:38,470 in October. 1009 01:34:39,350 --> 01:34:46,690 If you back up, Evan, what we're proposing is much, many more touch points, many more opportunities 1010 01:34:46,690 --> 01:34:52,610 for, remember those goals, for collaboration and coordination among much larger group of 1011 01:34:52,610 --> 01:34:52,890 people. 1012 01:34:54,030 --> 01:34:58,670 So, we would start planning an engagement in the first quarter, and that's primarily that 1013 01:34:58,670 --> 01:35:03,350 That group, I mentioned, those two groups, I mentioned, the Capital Project Office and 1014 01:35:03,350 --> 01:35:03,990 the Advisory Board. 1015 01:35:04,090 --> 01:35:06,330 We're doing that in coordination with one another. 1016 01:35:06,930 --> 01:35:12,310 April and May is when we update those assessments, assuming that they're annual updates, if not 1017 01:35:12,310 --> 01:35:13,710 it would be whenever they are. 1018 01:35:14,990 --> 01:35:21,170 June, July is when we're submitting the needs, and then August and September, again, the 1019 01:35:21,170 --> 01:35:23,930 CPO and the Advisory Board are validating, prioritizing. 1020 01:35:25,330 --> 01:35:28,650 and then budget development happens in October and November. 1021 01:35:29,010 --> 01:35:34,010 Now, that doesn't mean that council never hears about this across that timeline until October and November. 1022 01:35:34,470 --> 01:35:36,290 It just means these are the primary players. 1023 01:35:36,730 --> 01:35:40,610 The plan would be to keep you informed along the way so that you know what's happening. 1024 01:35:40,610 --> 01:35:49,430 And we'll talk more about that in just a minute so that you can see what some of the information that you'll be getting throughout the year is going to look like. 1025 01:35:50,410 --> 01:35:53,770 Evan, if you can go to the next slide, please, actually go beyond that. 1026 01:35:55,030 --> 01:35:59,190 So these groups are meeting, they're doing stuff, they're analyzing all this data, they're 1027 01:35:59,190 --> 01:36:03,110 looking at needs that people are submitting, they're looking at available funding. 1028 01:36:04,870 --> 01:36:10,290 And they're coming up with a prioritized recommended capital program. 1029 01:36:11,470 --> 01:36:16,970 This is an example, this may or may not be what it actually looks like, but this is a hypothetical 1030 01:36:16,970 --> 01:36:41,050 example where you're assessing all of these things and you're coming up with a prioritized list that would be submitted to counsel during budget development that would include the capital cost and then the life cycle cost so you would know what the expected cost over the remaining life of that asset is going to be because that's an important part that ends up dropping down to the operating budget on an annual basis. 1031 01:36:41,050 --> 01:36:46,490 So you have a capital cost, and then you have an ongoing operating cost for every one 1032 01:36:46,490 --> 01:36:50,950 of these assets, some are greater than others, but they all have them, and we need to make 1033 01:36:50,950 --> 01:36:55,130 sure that we're incorporating them into the discussion. 1034 01:36:56,070 --> 01:37:02,530 And so that would be the proposed way to bring the capital facilities plan to the council on 1035 01:37:02,530 --> 01:37:04,810 an annual basis, having gone through this process. 1036 01:37:06,770 --> 01:37:12,050 Before we move on, any questions about this phase? 1037 01:37:15,180 --> 01:37:16,200 Questions or comments? 1038 01:37:16,780 --> 01:37:17,220 Either or. 1039 01:37:18,000 --> 01:37:19,220 I want this to be a dialogue. 1040 01:37:19,460 --> 01:37:20,560 I know there's a lot of information. 1041 01:37:21,240 --> 01:37:23,180 So I do have, I guess, one. 1042 01:37:24,000 --> 01:37:28,040 It's not so much a question, but more of a comment on this. 1043 01:37:28,940 --> 01:37:32,160 So if can we go back to slides? 1044 01:37:32,320 --> 01:37:32,820 I think it is. 1045 01:37:37,040 --> 01:37:56,360 Yeah, so on this on this list, I guess I have two questions. One, you know, if I'm a member of the planning commission or the community engagement commission or the parks and arts commission, you know, I'm not necessarily looking at what the city has available. 1046 01:37:56,980 --> 01:38:03,280 I'm, as a member of that commission, or a member of that board, I'm trying to advance 1047 01:38:05,180 --> 01:38:10,240 different projects and different proposals and different ideas as much as I possibly can. 1048 01:38:10,460 --> 01:38:20,040 So, I guess my question is twofold. One, how do we prevent it from becoming an issue where, 1049 01:38:20,040 --> 01:38:32,100 You know, the planning commission is trying to put forward a bunch of things without necessarily regard to the library commission without necessarily regard to the community engagement commission. 1050 01:38:33,360 --> 01:38:41,740 I guess that's my first comment and then my second comment is and you mentioned mark that they would be looking at available funding. 1051 01:38:43,340 --> 01:38:47,920 So if they're looking at available funding are they just doing it within the parameters 1052 01:38:47,920 --> 01:38:52,880 of what's available or are they doing it within the parameters of here's what we'd 1053 01:38:52,880 --> 01:38:59,540 like to see and I'll give you an example you know the Parks and Arts Commission has come 1054 01:38:59,540 --> 01:39:05,040 to us with different ideas and different proposals and actually this council voted to increase 1055 01:39:05,040 --> 01:39:07,680 the amount we were putting in Parks and Arts to fund all these different things. 1056 01:39:07,680 --> 01:39:12,820 So is this going to be a scenario where whoever this person is that represents the Parks and 1057 01:39:12,820 --> 01:39:17,700 Arts Commission comes to the steering committee and says, hey, we've got these five or six 1058 01:39:17,700 --> 01:39:23,920 priorities that we want to put on this list for next year, and it's going to cost $500,000 1059 01:39:23,920 --> 01:39:24,560 to do that. 1060 01:39:24,920 --> 01:39:28,540 And then it's advanced from there, do you understand what I'm trying to get at? 1061 01:39:29,240 --> 01:39:29,340 Yeah. 1062 01:39:30,520 --> 01:39:36,580 To answer the first part of the question, what would help control that or manage that would 1063 01:39:36,580 --> 01:39:44,260 be the ordinance establishing the board. It would have a purpose, it would have rules. 1064 01:39:45,760 --> 01:39:50,940 And the planning commission member would not necessarily be representing the interest of 1065 01:39:50,940 --> 01:39:57,980 the planning commission on the advisory board. If these folks are already engaged, they're 1066 01:39:57,980 --> 01:40:04,760 already plugged into capital conversation. And so, gleaning that knowledge and experience 1067 01:40:04,760 --> 01:40:12,640 It seems to make a lot of sense, but the mission, the reason that that board would be commissioned 1068 01:40:12,640 --> 01:40:17,240 would be the purpose that those people got together to meet, which would be to help prioritize 1069 01:40:18,120 --> 01:40:19,100 capital needs. 1070 01:40:19,840 --> 01:40:26,160 And so, Evan, if you go to the validation and prioritization slide, you know, this would be 1071 01:40:26,160 --> 01:40:33,100 somewhat, and this is, I'm not trying to hedge, but it literally is true. 1072 01:40:33,100 --> 01:40:38,940 It's whether, however you want to look at this, this is objectively subjective or subjectively 1073 01:40:38,940 --> 01:40:39,860 objective, right? 1074 01:40:41,020 --> 01:40:45,100 And so there's, there's, there's subjectivity that goes into this. 1075 01:40:45,320 --> 01:40:51,500 But at the end of the day, whatever the council says, and this is an example, right? 1076 01:40:51,600 --> 01:40:55,120 So you would have, I don't know how many projects are on our currency FB, but it's something 1077 01:40:55,120 --> 01:40:56,640 like 80, right? 1078 01:40:57,040 --> 01:40:58,880 So you would have 80 things on a list. 1079 01:40:58,880 --> 01:41:03,620 And the council decides where the funding is, the cutoff, the number. 1080 01:41:04,300 --> 01:41:09,240 So wherever that capital cost, the sum gets to that number. 1081 01:41:09,340 --> 01:41:10,340 That's the cutoff, right? 1082 01:41:10,980 --> 01:41:12,340 And you're not going beyond that. 1083 01:41:12,440 --> 01:41:15,820 Unless the council says, well, that project's important, I want to fund that. 1084 01:41:16,420 --> 01:41:19,640 So the advisor board isn't making funding decisions. 1085 01:41:19,960 --> 01:41:24,520 It's making recommendations within available funding. 1086 01:41:24,520 --> 01:41:31,580 And then the council is saying we're going to accept that recommendation and set keep the bar of funding there or we're going to make some tweaks. 1087 01:41:31,980 --> 01:41:41,960 So I guess my question then is on that timeline, when does that available funding mechanism be, when is that put into place in the prior years budget? 1088 01:41:42,300 --> 01:41:42,520 Yes. 1089 01:41:45,960 --> 01:41:48,720 And then it has inflows as decisions are made. 1090 01:41:49,080 --> 01:41:49,200 Okay. 1091 01:41:49,500 --> 01:41:49,600 Yeah. 1092 01:41:53,420 --> 01:41:59,640 I just appreciate the participation from other groups in the establishment of priority in the review of the data. 1093 01:42:00,740 --> 01:42:10,680 I think another set of eyes from a broad set of the people who are already participating in our government support and validate that priority. 1094 01:42:11,240 --> 01:42:13,300 So I think I recognize what the objective. 1095 01:42:14,020 --> 01:42:17,760 And before we move off of this, I just kind of flew over this. 1096 01:42:17,900 --> 01:42:20,420 Evan, if you go back to the new cycle slide, 1097 01:42:20,540 --> 01:42:22,720 I want to make sure that I highlight this. 1098 01:42:23,480 --> 01:42:25,240 But we're proposing engagement. 1099 01:42:26,120 --> 01:42:29,520 There hasn't been a lot of public engagement in this dialogue. 1100 01:42:29,780 --> 01:42:33,640 There's been some, but we want, again, we want to make it deliberate. 1101 01:42:33,840 --> 01:42:35,680 We want to make it meaningful and purposeful 1102 01:42:35,680 --> 01:42:39,320 and use it to inform the decision making. 1103 01:42:39,320 --> 01:42:42,660 and that's early on in the cycle as we have it. 1104 01:42:44,840 --> 01:42:48,940 All right, let's go to the perform slide. 1105 01:42:49,340 --> 01:42:53,200 All right, so now the last phase of the process. 1106 01:42:53,340 --> 01:42:55,120 Now it's time to deliver, right? 1107 01:42:55,240 --> 01:42:58,420 We want to perform, and this is where accountability comes in, 1108 01:42:59,220 --> 01:43:05,000 and we want to be able to show that we're delivering on the plan, on the vision. 1109 01:43:05,000 --> 01:43:09,700 And so this phase is the steps of delivering the projects and reporting about them. 1110 01:43:10,360 --> 01:43:16,100 And so, Evan, if you go to the next slide, we want to show you some things that are already in place. 1111 01:43:16,560 --> 01:43:20,560 Number one, and number two, that you will be seeing more about in the near future. 1112 01:43:21,760 --> 01:43:23,320 Ben, do you want to cover this one? 1113 01:43:23,580 --> 01:43:28,620 Sure. So this is our public portal, basically, for to let the public know what's going on with the projects. 1114 01:43:28,700 --> 01:43:33,280 We have this project up there that we've been working on design since the beginning of the year. 1115 01:43:33,280 --> 01:43:36,640 it's getting ready to start the summer. Linda, this is exactly what I sent you earlier today 1116 01:43:37,400 --> 01:43:42,980 to include in your newsletter. We also had one up for Appleway and we updated it. So this is, 1117 01:43:43,220 --> 01:43:48,900 we update this as real time as we can get it as things change around the project. So right now, 1118 01:43:48,900 --> 01:43:53,140 you can see some very fuzzy dates, which I can't read from here. But I recall that they are fuzzy 1119 01:43:53,140 --> 01:43:58,580 because we don't have a contract awarded yet. But when that gets awarded sometime towards the end 1120 01:43:58,580 --> 01:44:02,680 of next month or a little bit after that, we'll be able to fill in some of those dates and keep the 1121 01:44:02,680 --> 01:44:07,460 public informed. So any of the big capital projects that the city's executing to be a contract. 1122 01:44:07,840 --> 01:44:12,400 The intent is to keep this on the public portal so that folks can take a look at this. 1123 01:44:12,520 --> 01:44:16,540 I will also link these projects on my monthly reports. Just in case you want to check on. 1124 01:44:16,880 --> 01:44:18,140 Check them out on the monthly basis. 1125 01:44:20,060 --> 01:44:25,020 And so, as Ben mentioned, this is up there now to point out on the bottom right. 1126 01:44:25,220 --> 01:44:28,080 Although if you were looking at this online, it would not be in that place. 1127 01:44:28,080 --> 01:44:31,020 But because of space on the slide, we had to kind of shift it over. 1128 01:44:31,020 --> 01:44:34,860 There's a public comment forum on each of these project pages. 1129 01:44:35,560 --> 01:44:40,800 So it allows people in the community to tell us, hey, why is the schedule the schedule? 1130 01:44:41,040 --> 01:44:42,060 Are you going to consider this? 1131 01:44:42,460 --> 01:44:44,520 Why not extend it down to the next intersection? 1132 01:44:45,060 --> 01:44:51,440 So those kinds of questions are able to be asked and responded to in the portal. 1133 01:44:51,600 --> 01:44:56,100 Now, that doesn't mean that we aren't going to do additional engagement. 1134 01:44:57,160 --> 01:44:59,920 For this particular project, we had a community 1135 01:45:00,000 --> 01:45:28,220 The meeting, we invited folks, particularly along this route, but anybody from the public to come down and learn more about the scope, the schedule, and the budget, so they could find out how it would impact them directly their travel route, potentially access to their business. We had a handful of folks turn out. We were pleased with the turnout, but we would propose to have a similar kind of a bit for major infrastructure projects going forward. It's all about being transparent. 1136 01:45:29,700 --> 01:45:38,960 and engaging the public so that they know what's going on and are able to relate to how investment is being made and what that return on investment is. 1137 01:45:40,260 --> 01:45:41,620 Any other comments on this one been? 1138 01:45:42,720 --> 01:45:44,900 All right, I'm going to the next slide if you don't mind. 1139 01:45:45,720 --> 01:45:48,820 And so this is an excerpt from a report. 1140 01:45:48,820 --> 01:45:58,700 effort. If you all will think back to when the previous city engineer was here, we were 1141 01:45:58,700 --> 01:46:07,160 doing at least quarterly project updates. So our proposal is to resume that practice. 1142 01:46:07,880 --> 01:46:12,460 We want to develop a report that covers all of these projects. We want to talk about scope 1143 01:46:12,460 --> 01:46:18,760 schedule budget strategy and Ben has put this together and plans to deliver it for the 1144 01:46:18,760 --> 01:46:23,300 first time soon and talk about it at the April 1st Council meeting. Any other comments 1145 01:46:23,300 --> 01:46:26,700 you want to make about this? No, I don't think so. So we've got a slide specifically 1146 01:46:26,700 --> 01:46:31,440 that looks very similar to this for any of the projects from the recent CFP that's in 1147 01:46:31,440 --> 01:46:36,560 progress. So there's some kind of summary information at the beginning of the report and 1148 01:46:36,560 --> 01:46:38,500 and then I provide a slide for each project 1149 01:46:38,500 --> 01:46:40,400 so you can kind of see where they're at and where we're at. 1150 01:46:43,970 --> 01:46:46,950 So as projects are being delivered, right? 1151 01:46:47,030 --> 01:46:48,690 We didn't talk a lot about delivery here, 1152 01:46:48,850 --> 01:46:51,430 but that CPO, that Capital Program Office, 1153 01:46:52,750 --> 01:46:54,930 and we have a project manager. 1154 01:46:55,190 --> 01:46:56,290 In fact, we have a new, 1155 01:46:57,270 --> 01:46:59,790 have we re-classified engineering tech? 1156 01:47:00,030 --> 01:47:00,490 Is that what we're calling? 1157 01:47:00,890 --> 01:47:02,350 Yeah, so he's an engineering tech. 1158 01:47:02,990 --> 01:47:05,070 I think we hired Anthony before we had 1159 01:47:05,530 --> 01:47:06,550 Michael's our city engineer, 1160 01:47:06,550 --> 01:47:07,970 So they're kind of working in tandem. 1161 01:47:08,290 --> 01:47:10,530 I also participate in that effort as well. 1162 01:47:11,150 --> 01:47:15,630 So on a delivery side, we've got active, you know, project management oversight. 1163 01:47:15,930 --> 01:47:20,730 All of those things happening in at that CPO discussion that's happening monthly. 1164 01:47:20,930 --> 01:47:24,110 All of that is being managed within that group. 1165 01:47:24,610 --> 01:47:29,930 These are examples of reports that are not only intended to engage the public, 1166 01:47:29,930 --> 01:47:34,650 but also to keep council and the public informed about delivery of those projects. 1167 01:47:34,650 --> 01:47:44,290 But the management of the delivery is happening at a staff level by Public Works Director, city engineer, community development director, project manager. 1168 01:47:45,030 --> 01:47:52,890 And so you see the results here and can ask questions about, hey, you said, may, it's already June. What's up with this, right? 1169 01:47:53,290 --> 01:47:57,730 That's the accountability piece that we want to keep preserved and fresh and moving. 1170 01:47:57,730 --> 01:48:04,250 So before we move on, there's a few more cleanup things. 1171 01:48:04,670 --> 01:48:07,150 Any questions about the delivery side? 1172 01:48:09,770 --> 01:48:10,110 All right, Evan. 1173 01:48:10,990 --> 01:48:12,890 This is just a next slide, please. 1174 01:48:13,110 --> 01:48:14,610 This is just a reminder you've seen this before. 1175 01:48:15,190 --> 01:48:18,410 We've talked tonight about the public investment side. 1176 01:48:18,850 --> 01:48:21,130 To help implement the comprehensive plan. 1177 01:48:22,010 --> 01:48:27,250 Really all of this is funneled down to kind of the. 1178 01:48:27,250 --> 01:48:29,710 So what's the punchline, right? 1179 01:48:30,290 --> 01:48:34,650 Evan, if you go to the next slide, we really want to get to the outcome. 1180 01:48:35,770 --> 01:48:40,130 For public investment to be meaningful, it has to, it must. 1181 01:48:40,630 --> 01:48:44,370 It's required to yield public value. 1182 01:48:44,830 --> 01:48:46,710 Otherwise, why do it, right? 1183 01:48:47,170 --> 01:48:56,030 That's what we're pointing and aiming at is improving the community by yielding public value. 1184 01:48:56,030 --> 01:48:58,650 And that can be defined in a lot of different ways. 1185 01:48:58,830 --> 01:49:04,490 If you look at our strategic plan, it's defined in these ways, quality of life, public safety, 1186 01:49:04,630 --> 01:49:06,890 economic development, mobility, and all of these other things. 1187 01:49:07,530 --> 01:49:12,530 And those definitions could change over time as Council adopts the new comprehensive plan 1188 01:49:12,530 --> 01:49:18,010 and the new strategic plans, but that's what we always want to keep in focus, that the dollars 1189 01:49:18,010 --> 01:49:20,130 were investing yield public value. 1190 01:49:20,130 --> 01:49:27,730 And so that's really what this procedural change, this management change, is designed to 1191 01:49:27,730 --> 01:49:32,330 do regardless of how much money we have to spend or how many projects we're delivering. 1192 01:49:32,850 --> 01:49:37,090 We want to do it better and more effectively and more strategically. 1193 01:49:38,250 --> 01:49:41,570 And so with that, the next slide shows next steps. 1194 01:49:42,650 --> 01:49:45,450 And so we're not asking you to make a decision tonight. 1195 01:49:46,110 --> 01:49:48,590 We are asking for some direction. 1196 01:49:49,310 --> 01:49:52,110 We've proposed creating this advisory board. 1197 01:49:52,990 --> 01:49:59,030 We would propose creating it like any of the other commissions and boards by ordinance. 1198 01:50:00,370 --> 01:50:07,390 And if council agrees, we will put together a draft ordinance to bring back for future consideration. 1199 01:50:07,910 --> 01:50:12,510 And we're also saying that we probably need to have more discussions like this. 1200 01:50:12,510 --> 01:50:19,870 obviously we would not have the same discussion again, but as we get down the road with decision-making, 1201 01:50:21,050 --> 01:50:29,270 these kinds of workshops, I think are valuable, at least at certain increments. Not more than 1202 01:50:29,270 --> 01:50:35,410 a couple of times a year necessarily, but it helps to keep things level set, I believe. 1203 01:50:36,150 --> 01:50:42,110 And I hope you have gotten value out of this. I hope it spurred some questions that maybe brought 1204 01:50:42,110 --> 01:50:48,410 back at a later time, spurred some thoughts about how we have been doing things and given 1205 01:50:48,410 --> 01:50:57,290 you kind of optimism, excitement, staff calls it fun, I'm the only one who calls it fun. 1206 01:51:00,390 --> 01:51:03,370 But we want to do a good job for the community. 1207 01:51:03,370 --> 01:51:06,830 We want to deliver value for the community and that's what this is all about. 1208 01:51:07,070 --> 01:51:08,570 So we hope that we've communicated that. 1209 01:51:08,570 --> 01:51:13,310 And with that, we will stand for any questions or comments or dialogue. 1210 01:51:14,370 --> 01:51:18,290 Got a question. Could you go over again on the Capitol Investment Advisory Board? 1211 01:51:19,110 --> 01:51:25,670 How much can be formed if I got it correctly, like one individual assigned from each of the committees now? 1212 01:51:26,030 --> 01:51:26,710 It would be on that. 1213 01:51:27,410 --> 01:51:37,230 So what we're proposing, and again, we'll bring back if council chooses to go that route, we'll bring back some language that we can further discuss. 1214 01:51:37,230 --> 01:51:44,450 the proposal that we would make, staff would make, is that the makeup of the advisory board is five members. 1215 01:51:45,130 --> 01:51:51,570 One member from the Planning Commission, one member from Parks and Arts, one member from the Library Board, 1216 01:51:52,170 --> 01:52:01,530 one member from Community Engagement, and then an at-large member appointed by the mayor from the community that would sit on that board to make a fifth member. 1217 01:52:02,810 --> 01:52:07,950 There's an example of a pool of candidates that may fill that at large slot. 1218 01:52:08,370 --> 01:52:15,750 There's a group meeting that is actively discussing pedestrian walkability, bicycle safety, 1219 01:52:16,110 --> 01:52:19,590 that may be a good person to tap or a person from that group may be a good one to tap. 1220 01:52:19,870 --> 01:52:25,370 There could be all kinds of people with an interest in wanting to put their fingerprints on 1221 01:52:25,370 --> 01:52:27,850 how the city makes these kinds of capital investments. 1222 01:52:27,850 --> 01:52:31,470 But that would be our recommendation, those five individuals. 1223 01:52:32,270 --> 01:52:37,210 So you'd mention that there would be a representative from one of those. 1224 01:52:37,890 --> 01:52:42,190 And because that changes, they may be on that committee, they may not. 1225 01:52:43,010 --> 01:52:45,790 That would change in itself, who's available. 1226 01:52:46,550 --> 01:52:50,690 Would they, the recommendation come for this advisory board or that come from the individual. 1227 01:52:51,410 --> 01:52:53,450 Like parks and art committee or something like that. 1228 01:52:53,450 --> 01:52:59,190 That would be our recommendation, yes, is that the board itself would appoint whoever that member was going to be. 1229 01:53:03,980 --> 01:53:07,880 So I'm enthusiastic actually regarding the opportunity here, the objective. 1230 01:53:08,740 --> 01:53:12,800 I always think that the actions we take are built truly on people. 1231 01:53:13,600 --> 01:53:18,260 And I'll call it the energy, the motivation, the ambition, and the actions taken by people. 1232 01:53:18,260 --> 01:53:20,120 and knowing our commissions, you know, 1233 01:53:20,440 --> 01:53:23,240 on what people are volunteers, do you think that we have people 1234 01:53:23,240 --> 01:53:25,720 who can engage to the level to make it successful? 1235 01:53:26,420 --> 01:53:28,280 And I'm not that familiar with all of our participants 1236 01:53:28,280 --> 01:53:29,300 in these commissions, so. 1237 01:53:30,160 --> 01:53:31,160 That's a great question. 1238 01:53:31,520 --> 01:53:36,180 And to help provide some additional context, 1239 01:53:36,660 --> 01:53:40,200 we're not proposing that we have an additional monthly meeting. 1240 01:53:40,680 --> 01:53:43,520 This group would meet maximum four times a year. 1241 01:53:45,960 --> 01:53:52,400 We're talking about, primarily in that validation and prioritization period. 1242 01:53:53,480 --> 01:53:57,680 So we're not talking about a fully fledged once a month's schedule with the potential 1243 01:53:57,680 --> 01:53:58,580 for extra meetings. 1244 01:53:58,620 --> 01:54:02,160 We're talking about a limited number that we would define in the ordinance. 1245 01:54:02,820 --> 01:54:02,920 Yeah. 1246 01:54:03,720 --> 01:54:07,180 Just as a follow up, Mark, I believe confidently that there will be some important and useful 1247 01:54:07,180 --> 01:54:11,360 exchanges between membership of the binding commission and the library board, or between 1248 01:54:11,360 --> 01:54:14,760 the Parks and Arts Commission and the Community Engagement Commission. The interactions that 1249 01:54:14,760 --> 01:54:21,580 would be taken in the moment I think would be a great value. Go ahead Council Member of all. 1250 01:54:22,400 --> 01:54:27,840 So okay so there was the advisory board you spoke about and then the Capital Program Office 1251 01:54:28,320 --> 01:54:33,140 is that I mean can you go back to that slide? Sure I haven't if you can backtrack to that. 1252 01:54:35,760 --> 01:54:36,320 So 1253 01:54:38,460 --> 01:54:40,800 that would be made up of staff. 1254 01:54:41,840 --> 01:54:46,220 The capital program office which has already been created, we've already been meeting 1255 01:54:46,220 --> 01:54:52,700 for close to a year to manage the capital program is made up of staff members largely 1256 01:54:52,700 --> 01:54:57,740 from, I mean, this is every department in the city, so we have at least one representative 1257 01:54:57,740 --> 01:55:00,000 from each of our operating departments. 1258 01:55:03,850 --> 01:55:10,990 So a couple of comments and then one question and I think you answered it with Mike's question. 1259 01:55:11,670 --> 01:55:19,190 So the commissions or the boards would appoint their own member to be on this or how would 1260 01:55:19,190 --> 01:55:19,410 that work? 1261 01:55:20,770 --> 01:55:21,230 Yes. 1262 01:55:21,450 --> 01:55:25,610 I mean, whatever appointment looks like, yes, they would make the decision of which of their 1263 01:55:25,610 --> 01:55:27,530 representatives would be on the advisory board. 1264 01:55:27,810 --> 01:55:27,930 Okay. 1265 01:55:27,930 --> 01:55:33,150 And then just second comment, you know, SRTC does something very similar to this, where 1266 01:55:33,510 --> 01:55:40,910 they have the different folks from the community that serve on an advisory board for the 1267 01:55:41,350 --> 01:55:49,010 sole purpose of coming up with the list, the prioritization list of what shouldn't 1268 01:55:49,010 --> 01:55:49,750 should not be funded. 1269 01:55:51,010 --> 01:55:55,170 And then the third comment I was going to make is, Evan, can we go back, I think it was 1270 01:55:55,170 --> 01:56:04,610 like the second slide that has just the list of the different funding gaps that we had. 1271 01:56:06,350 --> 01:56:07,510 One more back. 1272 01:56:09,070 --> 01:56:19,870 Yeah, this one. I think it's worth pointing out, you know, the number that we saw in our handout tonight in terms of the gap was 13.482 million. 1273 01:56:20,990 --> 01:56:34,250 Obviously if you do the quick math on how much we bring in in the streets fund each and every year and then plus that or excuse me minus that from the 17.5 we're looking at about 13 and a half million dollars. 1274 01:56:34,550 --> 01:56:44,170 So it seems to me that the biggest part of our gap is made up of roadway projects. Is that accurate? 1275 01:56:44,910 --> 01:56:57,210 Well, certainly the large and obviously the large and you know in our community like I mentioned before we and you all know better than I do we don't have water waste water infrastructure. 1276 01:56:57,210 --> 01:57:05,350 Those are huge dollar items we don't have those and so our most valuable asset in aggregate or our roadways for sure. 1277 01:57:05,550 --> 01:57:07,130 Thank you. 1278 01:57:08,820 --> 01:57:09,400 Anybody else? 1279 01:57:12,660 --> 01:57:13,740 Go ahead, councilmember. 1280 01:57:14,000 --> 01:57:17,520 Yeah, and just to dovetail up what council member 1281 01:57:17,520 --> 01:57:20,420 done said, and it doesn't sound like that's, 1282 01:57:20,540 --> 01:57:22,820 it's going to add a lot of additional time. 1283 01:57:23,360 --> 01:57:27,320 And I'm wondering whether there would be a consideration 1284 01:57:27,320 --> 01:57:31,160 to making that advisory, I think it was called 1285 01:57:31,160 --> 01:57:34,260 the advisory board, the top half of that committee, 1286 01:57:34,780 --> 01:57:37,860 making them all at large, rather than pulling them 1287 01:57:37,860 --> 01:57:38,520 from commissions. 1288 01:57:39,640 --> 01:57:45,140 That's an option that we could consider in talking about that among staff as we were 1289 01:57:45,140 --> 01:57:52,820 putting together the recommendation, you know, we could certainly, I believe we could 1290 01:57:52,820 --> 01:57:57,140 certainly find five at large folks that may be interested in serving in a capacity like 1291 01:57:57,140 --> 01:58:04,260 this. I think what we ended up landing on in this configuration was just the institutional 1292 01:58:04,260 --> 01:58:11,460 knowledge that the work that these boards are already doing would bring to that process. 1293 01:58:12,060 --> 01:58:19,180 And in addition, they're interested in serving and they would be continuing, it wouldn't 1294 01:58:19,180 --> 01:58:23,480 be a new capacity, it would be kind of in parallel to their existing capacity. 1295 01:58:23,840 --> 01:58:33,820 But either way, I think the mission or the purpose is to bring non-city staff 1296 01:58:33,820 --> 01:58:37,860 into that analysis prioritization process. 1297 01:58:42,290 --> 01:58:43,310 Anybody else? 1298 01:58:43,890 --> 01:58:44,450 Good. 1299 01:58:45,490 --> 01:58:48,070 I'm supportive of the advisory board idea. 1300 01:58:48,610 --> 01:58:51,470 Kind of a long councilmember Spencer's question. 1301 01:58:52,250 --> 01:58:54,950 Into something for you guys to think about with whatever you look 1302 01:58:54,950 --> 01:58:56,190 at bringing forward to us. 1303 01:58:58,090 --> 01:59:01,070 Even including past board members, 1304 01:59:01,230 --> 01:59:04,770 so there's people in the planning commission that maybe rotated off. 1305 01:59:05,170 --> 01:59:07,210 So maybe those are the people we look at for at large 1306 01:59:07,210 --> 01:59:11,950 or if they can't be filled by immediate and current planning or community engagement 1307 01:59:11,950 --> 01:59:17,830 people, but they know how things work and they might be people who are still wanting to serve, 1308 01:59:17,890 --> 01:59:23,590 but maybe couldn't commit to the, you know, once a month, but more times a year and they know 1309 01:59:23,590 --> 01:59:28,970 how things work. Not great, great suggestion, yeah. You need to have graduated the City Academy or 1310 01:59:28,970 --> 01:59:30,110 something along those lines, right? 1311 01:59:33,000 --> 01:59:36,460 I also like the concept of having individuals who are not 1312 01:59:36,460 --> 01:59:38,760 that on these existing ones that somebody knew, 1313 01:59:38,860 --> 01:59:40,440 and I certainly like Councilman Curse ideas, 1314 01:59:41,100 --> 01:59:43,300 even approach individuals who have been on these committees 1315 01:59:43,680 --> 01:59:44,840 and are no longer there, 1316 01:59:44,960 --> 01:59:47,540 but the idea of meeting once a quarter is good. 1317 01:59:48,160 --> 01:59:49,340 I was concerned it was gonna be monthly 1318 01:59:49,740 --> 01:59:51,900 and how much we've done this do we get to be effective, 1319 01:59:52,240 --> 01:59:53,920 but I certainly see the quarterly saying 1320 01:59:53,920 --> 01:59:55,020 I'm very in favor of that, 1321 01:59:55,880 --> 01:59:59,880 but I really would lean towards having individuals. 1322 02:00:00,000 --> 02:00:25,340 There are on those committees, but yet they do have some experience there. I know when we were looking to put the time in to get a community engagement commission. One of the concerns was, we're going to be able to find nine or 10 people. We're not already involved in other committees beyond there to keep that fresh look. And we've been able to be very successful with that. So that's why I was questioning a little bit that we're just recycling some of our same people into a new organization. 1323 02:00:25,340 --> 02:00:35,500 Is it really going to be effective? But once again, I like the idea quarterly. I like the idea of approaching individuals and not been on the committee or been on previous committees. 1324 02:00:39,330 --> 02:00:42,330 I'm sure there'll be more discussion on that when the time comes. 1325 02:00:44,330 --> 02:00:48,450 I actually am going to take the exact opposite approach. 1326 02:00:50,030 --> 02:00:54,390 It's not that I don't want more at large folks. I do. 1327 02:00:54,390 --> 02:00:59,170 And in fact, you know, I wouldn't necessarily be opposed to increasing the number of at-large. 1328 02:00:59,430 --> 02:01:04,390 But I do think there is value to having someone from the different commissions, 1329 02:01:04,390 --> 02:01:14,150 because as you say, Mark, I mean, they know, you know, back to the kind of the point I was trying to make earlier about the, 1330 02:01:14,870 --> 02:01:19,250 if you're a member of the planning commission, you know about the projects the planning commission is looking at. 1331 02:01:19,250 --> 02:01:24,290 If you remember the library board, you know about the library board projects that they're looking at. 1332 02:01:24,410 --> 02:01:34,150 So I think there is value in having those folks participate and you know, to me, I don't want to necessarily just create another board or 1333 02:01:34,150 --> 02:01:37,370 another advisory board just for the sake of creating more boards. 1334 02:01:38,330 --> 02:01:47,770 I do think there would be, I think there's something to be said for having people from these different commissions be part of it in some form or another. 1335 02:01:47,770 --> 02:01:49,810 or maybe that means it's, you know, the four, 1336 02:01:49,990 --> 02:01:51,190 and then you have three out largest. 1337 02:01:51,710 --> 02:01:53,930 You know, or maybe it's a rotating thing 1338 02:01:53,930 --> 02:01:56,070 where, you know, we've got a couple 1339 02:01:56,590 --> 02:01:59,010 from each of the commissions or boards each year, 1340 02:01:59,090 --> 02:02:00,410 but I do think there's value in that. 1341 02:02:00,710 --> 02:02:02,710 I think one thing for I jump to the councilman of course, 1342 02:02:02,870 --> 02:02:05,510 we need to consider the timeframe 1343 02:02:05,510 --> 02:02:07,510 that would get somebody brand new 1344 02:02:07,510 --> 02:02:10,370 who doesn't know the process on board 1345 02:02:10,790 --> 02:02:13,830 and that lead time to getting the grant. 1346 02:02:14,010 --> 02:02:15,310 They wouldn't be able to hit the grant anywhere 1347 02:02:15,310 --> 02:02:19,490 whereas I think a lot of, yeah, any current commission member would be able to do that. 1348 02:02:19,570 --> 02:02:21,210 Council member Kirsten, the Council member of Animal Men. 1349 02:02:21,510 --> 02:02:25,710 And just to go along with what Mayor Pro Tem said, I wasn't really clear in what I was saying, 1350 02:02:25,830 --> 02:02:30,950 I guess the, I think the, like the number one preference would be someone who's currently on one of 1351 02:02:30,950 --> 02:02:36,310 these boards or commissions and then perhaps if you can't fill or for the at large, someone who has 1352 02:02:36,310 --> 02:02:40,250 some experience. So the preference would be someone who is currently knows what's happening. 1353 02:02:41,130 --> 02:02:45,210 But if we're having trouble filling that with somebody who's current, maybe somebody who is 1354 02:02:45,210 --> 02:02:51,390 past and look emeritus of the commissions. And then at large, I think that there's probably 1355 02:02:51,390 --> 02:02:54,530 a good selection of people in the community who might be able to fill more than one at large 1356 02:02:54,530 --> 02:02:58,670 position, just like Mayor Pro Temo-Sing. Go ahead. That's a new man, woman. 1357 02:02:59,490 --> 02:03:07,090 Just thinking about how, as a county, you had the steering committee of elected officials. 1358 02:03:07,870 --> 02:03:13,430 Basically, they're representing each and every one of the corner of the county. The same thing 1359 02:03:13,430 --> 02:03:20,350 with the commission members like the idea I like the idea of having talent they know exactly 1360 02:03:20,350 --> 02:03:25,710 what's happening within the city and that way we can kind of hone in on these capital facilities. 1361 02:03:27,430 --> 02:03:28,930 Good points, cross-board. 1362 02:03:30,410 --> 02:03:31,210 Council Member Spencer. 1363 02:03:33,230 --> 02:03:38,650 So a couple of things. I know you mentioned the subjectivity and objectivity of this process, 1364 02:03:38,650 --> 02:03:39,070 Yes, right? 1365 02:03:39,790 --> 02:03:40,410 Very hard. 1366 02:03:40,510 --> 02:03:40,890 That phrase. 1367 02:03:41,090 --> 02:03:41,250 Yeah. 1368 02:03:41,530 --> 02:03:49,290 Well, I mean, as Ben was making the presentation, you know, just look a lot of that stuff is going 1369 02:03:49,290 --> 02:03:50,610 to be pretty objective, right? 1370 02:03:50,930 --> 02:03:55,290 You're going to plug in all the data and you're going to see, well, this road is really failing 1371 02:03:55,290 --> 02:03:57,350 and this road is okay, right? 1372 02:03:58,730 --> 02:04:06,290 And so I'm just curious how in depth this group is going to have to get and also as we've 1373 02:04:06,290 --> 02:04:13,190 been speaking, and as Council member Van Orman mentioned, I think if it's only going 1374 02:04:13,190 --> 02:04:18,270 to be four meetings a year and it's not going to be that in-depth, perhaps it's just 1375 02:04:18,270 --> 02:04:20,810 the council as that advisory board. 1376 02:04:23,260 --> 02:04:24,340 That's certainly an option. 1377 02:04:25,160 --> 02:04:34,640 I think in the decision about the recommended membership, one of the advantages that this 1378 02:04:34,640 --> 02:04:42,220 make-up gives us is that to the mayor's point, you wouldn't have kind of this training period 1379 02:04:42,220 --> 02:04:47,020 or acclimation period, all of these folks would be able to hit the ground running. 1380 02:04:47,340 --> 02:04:55,120 But there's no doubt that the folks that are working on the capital program would be helping 1381 02:04:55,120 --> 02:04:56,320 to guide that, right? 1382 02:04:56,620 --> 02:05:03,760 So the advisory board would not be expected to come up with these methodologies. 1383 02:05:03,760 --> 02:05:08,680 that we staff would be working on those and bringing those and then we would be working 1384 02:05:08,680 --> 02:05:17,580 to refine them and work out the bugs and making sure that all of those members of that entire 1385 02:05:17,580 --> 02:05:22,800 steering committee were comfortable with the results so that they would be confident in the recommendation. 1386 02:05:25,000 --> 02:05:28,000 But that certainly is an option if council so chose. 1387 02:05:28,000 --> 02:05:28,840 The 1388 02:05:32,940 --> 02:05:34,120 struggle I'm having with this, 1389 02:05:36,720 --> 02:05:40,980 I take my marching orders from you and your staff as 1390 02:05:40,980 --> 02:05:43,620 the experts because you guys are hired to do that, I know. 1391 02:05:44,340 --> 02:05:45,680 So I have to rely on that. 1392 02:05:46,300 --> 02:05:48,780 I feel that I'm getting that from you guys now. 1393 02:05:49,640 --> 02:05:55,900 So although I think the committee would have some advantages, are we just putting something 1394 02:05:55,900 --> 02:06:05,600 else in there to now have a committee of individuals to reiterate what you're telling us and it's 1395 02:06:05,600 --> 02:06:07,460 That would be my question. 1396 02:06:09,740 --> 02:06:18,320 So I would say no, and the reason I would say that is because the process of validating 1397 02:06:18,320 --> 02:06:24,020 and prioritizing would be done at the steering committee level, and so it would be informed 1398 02:06:24,020 --> 02:06:30,480 by both of those pieces simultaneously working together, collaborating. 1399 02:06:32,320 --> 02:06:51,950 But part of the reason why we have those individual board members, not the individuals, but the positions identified as such is because part of this is we want them to help promote public engagement, which hasn't been part of the process at all. 1400 02:06:52,730 --> 02:06:58,490 And that's really the piece that we want to bring into the mix to evaluate. 1401 02:06:59,870 --> 02:07:07,430 And again, going back to the validation and prioritization, I don't think so. 1402 02:07:08,550 --> 02:07:14,590 But obviously that would be something that we would have to keep in mind and make sure that we weren't just, for example, rubber stamping something. 1403 02:07:15,350 --> 02:07:19,490 Well, this isn't something that's going to be decided tonight, it'll come up in a future meeting. 1404 02:07:19,810 --> 02:07:21,950 So I think there's lots more discussion that'll be had. 1405 02:07:22,850 --> 02:07:24,190 Can I ask one more question? 1406 02:07:25,410 --> 02:07:27,030 Just real quick, Mark. 1407 02:07:29,410 --> 02:07:31,470 What would the scenario be? 1408 02:07:32,130 --> 02:07:35,070 I don't necessarily anticipate this happening. 1409 02:07:35,750 --> 02:07:38,630 But let's say the advisory board comes out and says, 1410 02:07:38,790 --> 02:07:42,670 we think our number one priority should be a dog park. 1411 02:07:42,670 --> 02:07:49,450 work. But then the capital program office comes out and says we've got streets that are 1412 02:07:49,450 --> 02:07:55,930 fallen apart. Our number one priority needs to be such and such a street. How does that 1413 02:07:55,930 --> 02:08:04,050 come together? I mean, is the steering committee then just compromise on what should be number 1414 02:08:04,050 --> 02:08:09,690 one and number two and number three, or is more weight given to the advisory board or to the 1415 02:08:09,690 --> 02:08:11,990 city staff, or you can walk us through that? 1416 02:08:12,090 --> 02:08:12,750 Yeah, great question. 1417 02:08:13,210 --> 02:08:16,670 Evan, if you can back, or maybe go forward to that validation 1418 02:08:16,670 --> 02:08:18,290 and prioritization slide. 1419 02:08:19,310 --> 02:08:21,190 And again, this isn't a final product. 1420 02:08:21,450 --> 02:08:24,850 But part of that would be similar to the way 1421 02:08:24,850 --> 02:08:27,930 that we evaluate proposals of some kind, right? 1422 02:08:27,930 --> 02:08:30,410 You have weights in different places. 1423 02:08:31,050 --> 02:08:34,290 And again, the methodology behind that 1424 02:08:34,290 --> 02:08:38,650 is to try to standardize the final ranking. 1425 02:08:38,650 --> 02:08:46,510 So that it is as objective as possible understanding that throughout that line there's some subjectivity, 1426 02:08:46,950 --> 02:08:50,610 especially if people are evaluating and scoring something. 1427 02:08:51,250 --> 02:08:57,250 And so the idea would be that all of that stuff would be happening in the steering committee, 1428 02:08:57,570 --> 02:09:02,030 not in the advisory board and in the CBO, and then we compare them. 1429 02:09:02,030 --> 02:09:13,870 It would be happening at the committee level and then you would have if there was a dispute it would have to be mediated in some way just as it's done at this 1430 02:09:13,870 --> 02:09:26,090 Dias or any other border commission meeting right now there would have to be some way to gain a final answer right and that would be procedural. 1431 02:09:26,090 --> 02:09:33,750 So, yeah, I'm kind of thinking back to the planning commission does things. 1432 02:09:34,270 --> 02:09:39,610 The planning commission will vote on whether a project meets their approval 1433 02:09:39,610 --> 02:09:41,570 and whether they recommend it to the council. 1434 02:09:41,910 --> 02:09:45,690 So I was just wanting to express that out loud 1435 02:09:45,690 --> 02:09:47,210 and see what your thoughts were on it. 1436 02:09:48,210 --> 02:09:50,970 And most of this work, just to follow up on that thought. 1437 02:09:51,110 --> 02:09:53,030 Most of this work is going to, again, 1438 02:09:53,030 --> 02:10:00,470 And we're validating the process that was used to assess each type of infrastructure. 1439 02:10:01,350 --> 02:10:09,350 And we're validating the ongoing needs assessment that is submitted during the budget development 1440 02:10:09,350 --> 02:10:09,870 process. 1441 02:10:10,190 --> 02:10:14,110 And then we're combining those things and then we're prioritizing. 1442 02:10:14,110 --> 02:10:24,210 We're not necessarily at the committee level going out and creating new project needs or something like that, right? 1443 02:10:24,550 --> 02:10:31,730 It essentially is validating information that's been collected and compiled, and then agreeing on the prioritization 1444 02:10:32,510 --> 02:10:36,650 through using an objective method to rank and score. 1445 02:10:37,950 --> 02:10:43,750 And of course, at some point, there's going to be on the margin a dispute. 1446 02:10:44,110 --> 02:10:46,830 that's going to have to be addressed. 1447 02:10:47,330 --> 02:10:47,610 Other 1448 02:10:52,440 --> 02:10:52,980 questions? 1449 02:10:54,220 --> 02:10:55,960 Is that it? 1450 02:10:56,660 --> 02:11:02,500 In terms of our presentation, yes, it sounds like if I can summarize that there's some consensus 1451 02:11:02,500 --> 02:11:07,680 about the advisory board. We maybe need to have more discussion about the membership and the makeup 1452 02:11:07,680 --> 02:11:13,520 and we can have that discussion. We'll bring back a proposed language at some future council 1453 02:11:13,520 --> 02:11:19,260 meeting unless you have that discussion again at that time and then we'll talk about in 1454 02:11:19,780 --> 02:11:26,520 the review of the workshop schedule at some future point another workshop to come back and revisit. 1455 02:11:27,560 --> 02:11:34,100 Sound good? All right. Just to make sure I'm not missing anything on the agenda. 1456 02:11:34,600 --> 02:11:37,920 Nope, it says adjournment. We are adjourned. Thanks everybody. 1457 02:11:39,300 --> 02:11:41,060 We missed the financial quiz.