[0:00] >> so my name is tom locascio. [0:03] I'd like to welcome you to our december 2nd public [0:07] comment session on the reform management contract [0:09] with pseg long island. [0:11] I'm going to turn it over to life as chief executive [0:15] officer tom falcon, who's going to go through a [0:19] presentation on some of the key elements of the [0:22] reform contract that will be before the life of [0:26] board on december 15th. [0:28] and then we'll go to our public comment portion, [0:31] tom. [0:32] um, good evening everybody. [0:33] and it's my pleasure to be here with you. [0:37] I would say that it is a special treat to spend any [0:42] evening with a group of people that want to are [0:46] interested in and want to spend time talking about [0:49] their local electric utility. [0:51] you are my kind of people. [0:53] uh, I'm joined here tonight by many members of [0:57] lipid, senior staff and our board. [0:59] uh, the comments as tom locascio mentioned are [1:02] recorded, uh, they will be put online. [1:05] uh, you will be able to look at the webinar on [1:09] life website and a summary of the comments will also [1:13] be provided to the lipid board at its december 15th [1:17] meeting for their consideration. [1:19] uh, this is one of a series of public events, [1:23] uh, and we are also accepting written comments [1:26] on the reform contract. [1:27] the one thing I wanted to do is start tonight with a [1:32] little bit of background to frame our discussion, [1:35] and then we're here to listen to you. [1:39] and so with that, uh, can we move to the next [1:43] page, tom? [1:44] so what brought us here tonight? [1:46] it's been a rather long journey along odyssey and [1:50] it all started as you may recall, on august 4th, [1:54] 2020, uh, that was tropical storm east [1:56] [inaudible] and it was a big storm. [1:59] uh, it was very damaging to the electric grid on [2:03] long island measured by the damage to the grid. [2:07] it was one of our top five storms to hit the long [2:11] island electric grid. [2:13] it caused about 645,000 customer outages. [2:15] uh, and it took about eight days to restore. [2:18] we're not here though because, uh, 645,000 [2:21] outages, uh, we're here because the restoration [2:24] did not go well. [2:25] if it had, we understand and know that we live on [2:30] an island and occasionally we're going to be affected [2:33] by big storms. [2:35] it doesn't make it, uh, something that we strive [2:38] for. [2:38] in fact, we strive to minimize that dislocation, [2:42] but occasionally there will be big storms and [2:45] there will be damaged the electric grid and it will [2:49] take time to restore, but you have a right to [2:53] expect, uh, good information and quick and [2:55] efficient restoration. [2:57] and to be able to get in touch with your local [3:01] electric utility, these are all reasonable [3:03] expectations and you have a right to expect that. [3:07] and the storm didn't meet that criteria. [3:10] in fact, all of our major it systems failed. [3:13] and these were systems that you, our customers [3:16] had invested a lot of money in on august 4th. [3:20] it was not clear what was going wrong, but it was [3:24] clear that something was going wrong. [3:27] and on august 5th lipa at the request of its board [3:31] began an investigation to get to the bottom. [3:34] even while the storm was ongoing. [3:37] you get to the bottom of what happened. [3:40] uh, the department of public service, which is [3:43] the staff arm of the state public service commission, [3:46] the regulatory commission also opened an [3:49] investigation. [3:49] those opened on august 5th and lipid at the request [3:53] of its board issued a 30 day report with our [3:57] initial findings in september, that initial [3:59] report focused on the failure of the it systems, [4:03] their proximate causes and immediate fixes that [4:06] needed to be done to stabilize the systems, go [4:09] to the next page. [4:11] then the board also requested a 90 day report. [4:15] by the time of that 90 day report, we had looked not [4:19] just at the proximate causes, but the underlying [4:23] root causes of what failed and concluded that they [4:26] were management issues. [4:27] and then deciding that they were management [4:30] issues. [4:31] and that lipid pays a lot of money for management [4:34] services, the board of trustees, as well as the [4:38] department of public service, uh, voted and [4:41] asked the lipid staff to either terminate our [4:44] relationship with pseg or renegotiated unacceptable [4:46] terms. [4:47] the board also adopted 85 recommendations that were [4:50] made public and that pseg filed plans to implement. [4:53] and we have in a quarterly basis, uh, shown you the [4:58] progress against those plans, that decision to [5:00] either terminate or, uh, renegotiate the contract [5:03] led to an initial view. [5:05] once again, at the lipid board's request to hear [5:09] and present publicly what our alternatives were. [5:12] we delivered that report in december, which was a [5:15] complete report, but a quick one, uh, the board [5:19] asked us pursuant to that report and its findings to [5:23] proceed with discussions with pseg and simultaneous [5:26] simultaneously also evaluate our other [5:27] alternatives. [5:28] those alternatives included privatization of [5:30] the utility. [5:31] we're a public utility publicly owned or [5:33] renegotiated contract with pseg or a contract with [5:37] somebody else as our management service [5:39] provider or life management. [5:40] we issued a report on april 28th in that april [5:44] 28th report. [5:45] we detailed and made public, uh, our findings [5:48] on those options, as well as the requirements. [5:51] if we were to reach and renegotiated deal with [5:55] pseg, what it would need to look like, go to the [5:59] next page, uh, at points, it did not appear like we [6:04] would be able to seek adequate terms. [6:06] the board directed us to issue and fully explore [6:10] alternative providers. [6:11] and in may, we issued a request for information [6:14] and began that process. [6:16] we also sought from you members of the public, [6:20] your feedback on those alternatives. [6:22] in that report in june, by late june, we had reached [6:26] a tentative settlement agreement with pseg long [6:29] island that met the eight reform objectives that the [6:32] board had set out in that tentative agreement. [6:35] we presented those terms publicly to the board, and [6:39] that was a settlement, but it was a term sheet. [6:43] it wasn't the final contract language. [6:45] if you go to the next page, I think the most [6:50] important thing was that it ensured stronger [6:52] management structure, accountability, and [6:54] oversight, and it also shortened the contract [6:57] term. [6:57] we, uh, at that point proceeded at the board's [7:01] direction to negotiate with pseg. [7:03] if you go to the next page and it took until november [7:07] 9th to reach an actual settlement agreement, a [7:10] proposed settlement agreement, the final [7:12] terms, and we made that more than a hundred page [7:16] agreement available on our website. [7:19] in addition to making that a hundred page [7:22] agreement available on our website, we also posted [7:25] 2022 performance metrics that would be under this [7:28] agreement. [7:29] and I'll talk more about those in a minute. [7:32] you see to the right, those eight items that we [7:36] detailed in that options analysis. [7:38] and I'll spend a minute talking about each of [7:42] those eight elements, the things that were requisite [7:45] for us to continue a relationship with pseg the [7:48] board instructed us to not come back without [7:51] addressing at least these eight things you go to the [7:55] next page, I'll briefly cover these and these [7:58] materials are also available online on our [8:01] website, but objective one, a greater share of [8:04] pseg is management compensation had to be at [8:07] risk. [8:08] we pay approximately $80 million a year. [8:11] and under our old contract, only 10 million [8:14] of that was at risk compensation for [8:17] performance under the new contract proposed new [8:19] contract, 40 million or 51% of the contract fees [8:23] would be at risk. [8:25] number two, the board said that there have to be [8:29] a new way of gauging performance under the old [8:32] contract. [8:33] the performance measures that that $10 million were [8:36] determined by were set in 2013 and it required [8:39] mutual agreement to update. [8:41] I think the contract was well-intended however, as [8:44] time marched on those measures became somewhat [8:47] stale and reaching mutual agreement to update to [8:50] stronger, more strict performance measures that [8:52] also accounted for all the variety of services pseg [8:56] provides to weipa and its customers became [8:59] challenging under the new agreement. [9:01] the board said, no, there has to be an independent [9:04] process to set standards pursuant to the, uh, the, [9:08] uh, desires of the board for the service to the [9:12] customers. [9:12] and that, that this contract does that. [9:15] it also expands the number of metrics from [9:18] approximately 25 to more than 110 covering all the [9:22] scopes of services. [9:23] so for example, under the prior contract, there were [9:27] no performance measures related to the it systems [9:30] that failed under the new contract. [9:32] there are many go to the next page. [9:36] it wasn't, uh, it was not just sufficient that we [9:39] have incentives. [9:40] we also have to have penalties for failure to [9:44] achieve minimum levels of performance. [9:46] and under the contract 10 to $20 million is at risk [9:50] for exceeding budgets. [9:51] five to 10 million is at risk for failures to, uh, [9:56] to implement the emergency response plan that the [9:59] lipid board and the department of public [10:01] service approved each year, that pseg is [10:04] supposed to execute in the event of outages. [10:07] this is about a thousand page document, and you can [10:11] see it on our website. [10:13] uh, if reliability, the average minutes, uh, [10:16] customers out of power fall below a minimum [10:19] standard. [10:20] there's a 10 million automatic penalty in the [10:23] contract customer satisfaction, a 3 million [10:25] penalty. [10:25] and if there's two consecutive failures, we [10:28] have the right to terminate the contract. [10:31] I should mention failures to implement the emergency [10:34] response plan for a 72 hour or more storm. [10:38] also give us a right to terminate the contract [10:42] violations of the emergency response plan or [10:44] failure to provide safe and adequate service [10:47] subject to an investigation, another 20 [10:49] million. [10:50] so in total 10 million is at risk based on a [10:54] calculation of failures to meet a minimum level on [10:58] the emergency response plan. [10:59] and we can terminate and additional 20 million. [11:02] so 30 million in total, if an investigation finds [11:06] other violations of the emergency response plan in [11:09] the event of a major outage, a failure to [11:13] implement minimum protocols for [11:14] cybersecurity, also an event of failure or an [11:17] event of default for which we can terminate the [11:21] contract term has also been shortened. [11:23] and, uh, the importance of this is that the old [11:27] contract had a, uh, gave to pseg, essentially a [11:31] right of renewal at their option for an additional [11:34] eight years. [11:35] so while the contract term extended to 2025, with [11:39] that right of renewal, the contract could extend all [11:42] the way to 2033. [11:44] we eliminated that option, uh, of pseg to [11:47] automatically extend the contract at their right. [11:50] uh, if we agree to extend the contract, it will be [11:54] based on the performance over the next four years. [11:58] and that will be a future decision of the lipid [12:02] board based on how the contract goes. [12:05] number, uh, the next objective on the page, in [12:08] the middle of the page management, it was [12:11] ultimately a management failure. [12:13] and you can read all about in those publicly [12:16] available reports, but we insisted on a dedicated [12:19] and strengthened management team with all [12:22] the authority necessary to provide service to long [12:25] island, to make sure that those individuals who run [12:29] the utility every day are exclusively focused and [12:32] dedicated and coming in every day, thinking about [12:35] long island, it also requires the addition of [12:38] five new senior level positions, all based on [12:41] long island. [12:42] uh, the contract requires a duty of candor. [12:45] and if there's a violation of the duty of [12:49] candor, uh, as described to you on the page that [12:53] also provides a right to terminate the contract [12:56] early, go to the next page. [12:58] it requires that if lippa fines and the board adopts [13:02] with the recommendation of the department of public [13:05] services, well, if lipid finds that there is a [13:09] deficiency and operations, there is a period of time [13:13] with which to correct that deficiency under the [13:16] contract and it's term limited objective seven, [13:18] uh, long-term planning, budgeting development, and [13:21] cost management. [13:22] the contract requires the development of long-term [13:24] plans to meet the scopes of services that are [13:28] required. [13:28] uh, objective eight, uh, the partitioning of the [13:31] long island. [13:32] it systems separate from new jersey, which provides [13:35] greater clarity responsibility. [13:37] this was another core ease-of-use finding, and [13:39] you can read all about it in our report. [13:43] if you go to the next page, those described the [13:47] contract terms, but let's come back to what we're [13:50] trying to achieve. [13:52] we're not just trying to achieve a better contract. [13:55] the real ultimate goal is to provide great service [13:59] to our customers service that you should be proud [14:02] of, clean, reliable, resilient service at [14:05] affordable prices. [14:06] the lipid board has adopted standards [14:08] directives of what that service should look like. [14:11] and you can read all about them on our website, but [14:15] they include great customer satisfaction, [14:17] high reliability benchmark to the top 10% of [14:21] utilities industry leading emergency response, clean [14:23] energy, 70% renewable energy by 2030 and [14:26] entirely carbon-free grid by 2040 and rates that are [14:29] comparable to our region. [14:31] so you can read all about the board's standards in [14:35] this contract, provides the mechanism to make sure [14:38] that pseg management comes in every day, focused on [14:41] achieving those objectives. [14:43] if you go to the next page, I mentioned there's [14:46] $20 million at risk for meeting these performance [14:50] standards. [14:50] and there's another 20 million at risk for [14:53] failures to provide safe and adequate service. [14:56] basically subject to an investigation. [14:58] did talk a little bit about these performance [15:01] standards, because they're a key part of the contract [15:05] on the next page. [15:07] what you can see is that they cover all the types [15:11] of services that pseg management or pseg is [15:14] managing to, to, uh, provide services to lipids [15:17] and its customers. [15:18] so reliability, resilience, risk [15:20] management, customer satisfaction, external [15:21] affairs, it operations major projects, and they [15:24] cover all the scopes information technology, [15:27] customer service t and d business services, power [15:30] supply, and clean energy. [15:31] you can read all the details on our website. [15:35] if you click on that link or go to ally [inaudible] [15:39] dot com forward slash reform contract, there's a [15:42] more than a hundred page document. [15:45] and on that a hundred pages you can see for each [15:49] measure how it's defined and whether how pseg would [15:53] get paid under that measure. [15:54] if you go to the next page, I'll just highlight [15:58] a few examples. [16:00] so you understand the types of things I'm [16:03] talking about. [16:04] for example, there are three performance metrics [16:07] metrics of the 96 performance measures. [16:09] there are three around asset management. [16:11] why should you care about asset management? [16:14] well, the utility business is a very asset intensive [16:18] business, all those poles and wires and substations, [16:21] and they will have to be maintained reliably. [16:24] and, uh, not just reliably, we have to [16:27] collect the right data. [16:29] we have to maintain them. [16:31] uh, and, uh, on the right schedule, we have to use [16:35] the data that's available to us. [16:37] doing all these things increases reliability and [16:40] reduces costs. [16:41] implementing a world-class asset management program [16:43] is what this goes, uh, is about and the standards [16:47] and progress towards that. [16:49] you can read all about, uh, customer information [16:52] system. [16:52] why should you care? [16:54] well, that's the backbone customer system that when [16:57] you call and interact with our call center, or you [17:01] get a bill, that's the backbone system by which [17:04] we deliver all services. [17:06] and if you don't have a modern customer [17:10] information system, it's going to be very hard to [17:13] keep up with providing the types of services that [17:17] people come to expect in an age when you can do one [17:21] or two clicks or use an app and find out more [17:26] about your service, your billing, and meet your [17:29] needs, your own way, reliability. [17:31] there are many standards in the 2022 metrics that [17:34] you can read about just to highlight it. [17:37] uh, pseg has to fall within the top 10% of [17:41] utilities for, uh, reliability on blue sky [17:44] days. [17:45] they have to reduce the number of customers that [17:48] have four or more outages a year by 22%. [17:52] next year, they have to reduce the numbers that [17:55] have flicker outages by, uh, more than 13% and [17:59] reduce customers with six or more flickr outages by [18:02] 20%. [18:03] these are all good reliability measures, [18:05] resiliency. [18:06] we have very aggressive storm resiliency programs. [18:09] we all know storms are getting worse. [18:11] we have not just things that we'll be executing [18:15] next year, but also pilots that will lead to new [18:19] plans and programs in future years. [18:21] and you can read all about those types of initiatives [18:25] that we'll be delivering on in the coming year. [18:29] and in future years, customer satisfaction, [18:31] pseg has to implement seven particular projects [18:34] to improve customer satisfaction. [18:35] next year, they have to respond to your calls and [18:39] emails in a timely manner. [18:41] they have to respond to social media and tweets, [18:45] especially ones related to health and safety in a [18:48] timely manner. [18:49] they have to expand our low-income discount [18:52] programs for our customers that are less well off by [18:56] 34% compared to the historic level of [18:58] participants. [18:59] in those programs, you go to the next page. [19:02] more of these measures include an integrated [19:05] resource plan, which is something that we've run a [19:09] public process around. [19:10] this is planning for how we're going to meet a zero [19:15] carbon electric grid over the next 20 years, uh, to [19:18] deploying more energy storage on the grid in a [19:22] word, those contracts complete the analysis to [19:25] award those contracts by the end of next year, meet [19:29] very aggressive energy efficiency and [19:31] electrification goals for transportation and for [19:33] home heating. [19:34] these will reduce carbon in other sectors of the [19:37] economy, not just the electric grid, but in the [19:41] biggest sources of carbon emissions for long island. [19:44] and you can read all about those plans on our [19:48] website, doing things to make long island more evie [19:52] ready, uh, simplifying the interconnection process [19:54] for customers who want to put solar on their roof, [19:58] uh, expanding time of use rates. [20:00] what does that, that's an option for you to pick [20:04] different rates that perhaps better meet your [20:07] needs or save you money, a work management. [20:10] we all want efficiency tracking work better. [20:13] uh, making sure we have the right staffing levels, [20:17] uh, reducing over time, completing capital [20:19] projects on time. [20:20] these are all just examples of measures, [20:23] including the it measures where one is about, uh, [20:27] measuring and benchmarking, uh, to a [20:29] life, a hired a benchmark expert consultant to come [20:32] in and look at how well we implement our major it [20:37] systems and make sure we're following best [20:39] practices in those areas. [20:41] go to the next page. [20:43] so the importance of all this is that this is not [20:47] a, a second chance for pseg that's based in hope. [20:51] this is a second chance based on binding [20:54] contractual commitments with incentives, with a [20:57] stronger local management structure that we believe [21:00] fundamentally address the core issues out of [21:02] tropical storm east. [21:03] yes, we're putting this in front of, uh, our, uh, [21:07] citizens you're on long island, our customers, our [21:11] stakeholders, and ultimately our board. [21:13] and what we're here to do is listen to you. [21:17] and what you think about this, uh, our timeline for [21:21] public review includes, uh, a, uh, having released [21:24] the contract on our website, which you can [21:27] download it if you have not already, uh, starting [21:31] on november 9th, our november 17th meeting, [21:33] where we hold heard from some members of the [21:37] public. [21:37] and we also discussed in detail, the contract and [21:41] the performance standards, these public comment [21:43] hearings, as well as the ability to submit written [21:47] comments to help tonight, I will be accepting [21:50] written comments through december 9th, and then we [21:53] will be presenting the, uh, the, uh, views of our [21:57] stakeholders to the board on december 15th. [22:00] and they may consider the pseg contract on that date [22:04] as well, along with metrics and budgets [22:06] further that you can find right on our website. [22:10] so if you go to the next page, there is a lot of [22:15] information on the website. [22:17] we've put out a couple of fact sheets that [22:21] summarize this information. [22:22] there's links here on this page, where you can find [22:26] it on the website, but you can find everything. [22:29] you can find all those investigative reports. [22:32] you can find our quarterly reports. [22:34] we issued over six written reports, each one, [22:37] generally in the 50 to a hundred page range over [22:41] the last 15 months, you can find previous public [22:45] comments that we have received. [22:47] you can find videos from the last, uh, year, uh, [22:51] you can find summaries. [22:52] so there's a lot of information there. [22:55] and if anyone has suggestions or more [22:58] information, we're happy to have it. [23:00] and with that, if you go to the next page, we're [23:05] going to turn it back over to you for what we intend [23:09] to do tonight, which is hear from you. [23:12] but I, as I started out with, uh, we're here to [23:17] listen and we're excited that you're excited and [23:20] have participated many, uh, of the people on this [23:23] call participated with passion over the last 15 [23:27] months and care about your community and care about [23:30] your electric service. [23:31] and so we celebrate that. [23:33] we thank you for your active involvement and [23:36] participation, and thank you very much. [23:39] great. [23:40] thank you, tom. [23:41] so this will begin the public comment portion of [23:44] our meeting tonight. [23:45] uh, at this point I would ask anybody that's in the [23:50] attendee log to please raise your hand if you [23:53] would like to speak. [23:55] um, what I will do is I'll call off three names. [23:59] um, and then we'll keep adding to that list. [24:03] we do have several members of the community here [24:06] tonight that would like to speak on this, and we want [24:11] to make sure we give you ample opportunity, um, [24:14] prior to calling on you. [24:16] um, so our first three speakers, uh, based on an [24:20] order that hands were raised, uh, legislative, [24:23] bridget fleming, casey scheid, and fred harrison. [24:26] so at this time I'm going to bring legislator [24:29] fleming, um, into the panelists from hi [24:32] legislator. [24:32] good to see you again. [24:35] good evening, mr. Locascio good to see [24:37] you as well. [24:38] I appreciate the opportunity to be heard on [24:42] this important topic and that you'll be hearing [24:45] from members of the public as well. [24:48] suffolk county. [24:48] I am suffolk county legislator, bridget [24:51] fleming. [24:51] I serve as the vice chair of the public [24:55] transportation. [24:55] the public works transportation and energy [24:57] committee. [24:58] I am the chair of the, uh, community choice, [25:01] aggregation task force and the renewable energy task [25:04] force at the legislature and the chair of the ways [25:08] and means committee suffolk county is a major [25:12] customer of the utility. [25:13] our electric bill has run as high as $20 million in [25:17] recent years on june 8th, noting with alarm that [25:21] prolonged power outages and a breakdown of the [25:24] system use to communicate with the public after a [25:28] tropical depression, ies caused widespread hardship [25:30] and tried the patients of long island electric, uh, [25:34] customers, the suffolk county legislature, uh, [25:36] wrote, uh, to life, a board of trustees [25:39] unanimously urging that full consideration. [25:41] be given to the analysis of alternative options to [25:45] the current third party management system, rather [25:48] than seizing the opportunity to make real [25:50] change to the failed third-party management [25:53] system that has given us high costs, reliability, [25:56] and customer care failures and outdated technologies [25:59] as the world faces increasingly alarming [26:01] climate impacts. [26:02] we now see that we are returning to a [26:05] relationship with a failed partner. [26:07] from my perspective, this is a mistake on november [26:11] 10th. [26:11] in fact, senators gordon, senator gordon, and [26:14] assemblyman feel urge the board to delay voting on [26:18] the contract and to suspend the process until [26:21] the current investigation by the attorney general is [26:24] complete in her investigation as to [26:26] whether the failed response to eis actually [26:29] violated state law 535,000 customers were left [26:32] without power and without any effective [26:34] communication about when the lights would go back [26:37] on some for as long as 10 days, the public needs [26:42] additional time to review this contract work is [26:45] underway, uh, by legislators to take a hard [26:48] look at the alternative option of a fully public [26:51] utility with some of the highest rates in the [26:55] nation. [26:56] and with another rate hike proposed in the 2022 [26:59] budget and more than 90% reliance on fossil fuel [27:03] resources. [27:03] it's high time that we pause before obligating [27:06] rate payers to another four years with a partner [27:10] who has failed in so many ways has not been fully [27:14] forthcoming throughout this process and is still [27:17] missing milestones with revamping the outage [27:19] management system. [27:20] um, I know, um, tom, that you mentioned that, um, [27:24] that this all began on august the fourth. [27:27] uh, I want to disagree with you on that. [27:31] I think the failures, uh, at following the storm [27:34] ease ias in fact, gave us the opportunity to take a [27:39] hard look at a failed third party management [27:42] system. [27:42] unfortunately, the options analysis, which was a [27:45] great effort that was underway in august was [27:48] suddenly hijacked. [27:49] and without notice to many of the stakeholders who [27:52] had been involved, we were informed in the newspaper [27:56] that a contract was being pursued. [27:59] once again, with a failed partner tweaking this [28:02] failed third-party management system will not [28:04] serve rate payers. [28:05] I appreciate that increasing penalties for [28:08] failure to perform a shorter term and [28:10] flexibility to terminate the contract for failure [28:13] to comply with a long list of new items is moving in [28:18] the right direction. [28:19] but I urge you as have others to recognize that [28:23] considerations are underway both in albany, [28:25] under the attorney general and the state legislature [28:28] to look, take a hard look at what you, once we're [28:33] looking at. [28:34] and that is a real rigorous, uh, options [28:37] analysis and consideration of a fully public utility. [28:40] the urgency for fresh thinking that was [28:43] presented to us on, uh, on august the fourth, that [28:47] the hardships that our rate payers payers [28:49] suffered in august needs to be capitalized on [28:52] before we move forward with a contract with a [28:56] failed partner, I urge you to return to the public [29:00] options analysis delay entering into this [29:02] contract with someone, with a partner who has [29:05] failed to be forthcoming and has failed to meet [29:09] metrics time and time again, that basic [29:12] third-party management system is not serving [29:14] library. [29:14] quit payers. [29:15] please take the opportunity presented by [29:18] the hardships suffered by our rate payers to take a [29:22] fresh look and not go back to the same old ways. [29:26] thank you very much for the opportunity to be [29:29] heard. [29:30] it's a tough issue. [29:31] I wish you all the best. [29:34] I know we're all in it to serve the rate payers in a [29:39] reliable and cost effective way, and I offer [29:42] my support for that those efforts. [29:44] thank you very much and have a great evening. [29:48] thank you, legislator fleming. [29:50] and, uh, one other thing that I didn't mention, but [29:54] I do think it's important is that among all of our [29:58] termination rights is the right determinate for [30:01] municipalization who would have to pay a penalty to [30:04] do so about a $60 million, which was, uh, built into [30:09] the options analysis, but that is not different than [30:12] what we have currently. [30:14] so I do want to just note one thing, which is, uh, [30:19] if the governor and the legislature as a life, as [30:22] a public entity, to decide that we should go a [30:26] different way, uh, we have done nothing in the [30:30] contract that precludes that decision. [30:32] I do appreciate that. [30:34] and I know there's no, you, you don't want to [30:38] back and forth, but $60 million is three times the [30:42] annual cost of electric to suffolk county, uh, uh, [30:45] taxpayers for the suffolk county services. [30:48] but I appreciate that. [30:49] and I hope that you continue to think hard [30:53] about the things that I've presented. [30:55] thank you. [30:56] thank you. [30:57] thank you, legislator. [30:59] next step. [30:59] we'll have casey casey shy, followed by fred [31:03] harrison and then followed by antonio cruz. [31:05] so casey, we're going to move you in to the [31:09] panelist mode now. [31:11] hey guys, how are you? [31:13] um, okay. [31:14] uh, my name is casey shine. [31:16] I'm the political and communications director [31:18] for the international brotherhood of electrical [31:21] workers, local union, 10 49. [31:23] we represent 4,500 proud members. [31:25] that's almost 2000 members working each day to [31:28] operate, maintain the electrical transmission [31:30] and distribution system. [31:31] um, I wanted to come speak tonight on behalf of the [31:35] union and support other advise contract between, [31:38] uh, long island power authority and pseg long [31:41] island. [31:41] uh, lifetime pseg have been, they've maintained [31:44] such a strong partnership with ivw 10 49, and [31:48] they've always provided open lines of [31:50] communications on issues are important to our [31:53] members besides consistency, being [31:54] beneficial for our workforce. [31:56] uh, pseg took over in 2014 and the company's [32:00] commitment to safety has resulted in a 62% [32:03] improvement in osha cases. [32:04] this means our members are going home to their [32:08] families safely every day. [32:09] uh, in addition, pseg long island's commitment to [32:13] reliability has not only benefited customers, but [32:15] it's created jobs for our members since they took [32:19] over 900 miles of distribution. [32:21] mainline circuits have been storm pardoned, uh, [32:24] in 2021, the section circuits that have been [32:27] storm hearted has seen a 53% reduction in damage [32:30] leading to outages compared to the rest of [32:33] the distribution system. [32:35] this increases reliability and enhances customer [32:37] satisfaction. [32:37] uh, we're proud of the work that we do to support [32:42] long island and we enjoy our partnership with [32:45] light, but npcg so thank you for the opportunity to [32:49] speak. [32:49] uh, let's see. [32:51] it looks like a beautiful cat. [32:53] thank you. [32:54] you didn't do this all day. [32:57] so just now just to start. [32:59] all right, thanks guys. [33:01] okay. [33:01] next up will be fred harrison again, followed [33:04] by antonio cruz. [33:06] and then charles means, uh, and one of the [33:09] reminder we are timing everyone. [33:11] there is a five minute limit per speaker. [33:14] um, so far we've been held to that. [33:17] so we are keeping track and we will let you know [33:22] if you hit that point. [33:24] fred, you're moving in now I've read the floor is all [33:28] yours. [33:29] okie dokie. [33:30] thank you. [33:30] uh, I'd like to start by. [33:33] my name is fred harrison. [33:35] I'm a homeowner in merrick. [33:37] I'd like to start by thanking, uh, the life of [33:41] staff and mr. Falcon for their work and for that [33:45] thorough presentation tonight. [33:46] um, I'd like to say about the new contract, the [33:50] following, the proposed new contract documents, [33:52] how peace ag has been a money pit for rate payers. [33:56] uh, I thought that the cost of having pcyc [34:00] managed system was $80 million per year. [34:03] that's wrong management fees and profits. [34:05] only part of the story, looking at all the new [34:09] metrics and deliverables required by the proposed [34:12] agreement. [34:12] those 96 performance standards makes it pretty [34:15] clear. [34:15] that piece said long island has been getting [34:18] paid for work. [34:19] it has not done adequately, and it's not [34:23] just it work. [34:24] this is the eighth year of pcyc managing the system. [34:28] they profited handsomely receiving hundreds of [34:30] millions of bottles, of rate payer money in fees [34:34] and profits. [34:34] what have we gotten for our money accompany, which [34:38] he needs intensive supervision in virtually [34:40] every area of operation, transmission and [34:43] distribution on t power supply programs. [34:45] you name them mr. Falco, 13 major operation areas [34:49] and all, and this is no ordinary contractual [34:52] supervision. [34:52] leica will be closely watching p sec and dps [34:56] will be watching as well. [34:58] lots of rate payer money and staff time will be [35:02] devoted to all of this. [35:04] I was a high school teacher for decades. [35:07] the contract reads like a pins petition on steroids. [35:11] what exactly does of corporate bring to the [35:14] table? [35:14] how does piece of tech management contribute to [35:17] pair interests? [35:18] the evidence leads to the conclusion that piece sex [35:22] orientation is to advance peace. [35:24] and that's understandable. [35:25] we've seen that in their past performance. [35:27] we see it in their new ad campaign on subs september [35:32] 22nd, mr. Eichorn declared in a report to the lack of [35:36] board that peace was quote back to controlling the [35:40] messaging unquote that's for sure. [35:42] and it's new ads piece seg takes credit for the hard [35:46] work and goodwill of its workers. [35:48] it takes credit for the programs and improvements [35:51] paid for by life and its repairs. [35:54] not by pisa. [35:56] they don't do the job they're paid to do, but [36:00] they do take credit for what others do. [36:03] not a bad racket. [36:04] mr. Icahn's language gives it all away at that same [36:08] september 22nd meeting, he reported that quote, the [36:12] next storm will benefit us. [36:14] we welcome the next storm. [36:15] mr. Falco remembers that incident. [36:17] can you imagine welcoming a major storm? [36:20] think the death toll from ida, mr. Eichorn was not [36:24] thinking about me or my neighbors. [36:26] he's focused on what's good for peace second at [36:30] shareholders. [36:30] so the contract is clear evidence that you do not [36:34] and cannot trust pisa. [36:36] you've said that if the inadequate all contract [36:39] remains in force, the misfeasance suit continues [36:42] and we have a peace sag, which must be heavily [36:46] policed by lifeline. [36:47] if we have a new, stronger agreement, that it is a [36:51] much better and stronger agreement, no doubt. [36:54] we have a piece that must be thoroughly policed, [36:58] either way. [36:58] we have the albatross of peace and it's 80 million [37:02] in fees and profits. [37:04] we are counting on you to find a way out of this. [37:09] we need you to outline a clear roadmap leading to [37:12] the well-documented rate savings there for the [37:15] taking. [37:16] we don't need [inaudible] or any other profit molded [37:19] service provider to manage things for us. [37:22] we trust the capabilities of a life of staff. [37:25] they are very good at what they do. [37:29] they are fine public servants. [37:31] we hope that you trust them to trust them enough [37:34] to run the system without peace sec. [37:37] thank you. [37:38] thank you, mr. Harrison, for your very consistent [37:42] interest in lipid fairs over the last year, you've [37:45] come to many, many board meetings and public [37:48] comment hearing. [37:49] so we do appreciate your interest. [37:52] thank you. [37:53] okay. [37:53] next up, we will have antonio cruz followed by [37:57] charles leaves and then eric weltman antonio, [38:00] we're going to move you in to the panelists for you [38:04] now. [38:05] awesome. [38:05] can y'all hear me? [38:07] okay. [38:07] great. [38:07] thank you so much. [38:09] and to begin, um, mr. Falcon, I saw that, [38:13] um, in 2019, your base pay was over $280,000. [38:16] and, you know, for the sake of creating [38:19] cost-effective measures for ensuring people have [38:22] access to public utilities, um, ensuring [38:24] that electricity access is basically a right at this [38:28] point. [38:28] um, I think we need to address some concerns [38:31] about, um, the privatization of our [38:34] electric grid and our energy system here in long [38:37] island. [38:38] um, I see that the contract being proposed, [38:41] but essentially render long islanders putting the [38:44] cost of and efficiency, whether that is in the [38:47] form of a 2.3, um, price hike in 2021 in 2022 is in [38:52] your contract, which I believe even pseg [38:55] projected was supposed to be lower in costs, but [38:59] anyway, or in the tens of millions of dollars, uh, [39:03] should pseg fail to meet the demands for [39:06] eco-friendly efficient and consistent power [39:08] distribution on long island. [39:10] now I bring this up because regardless of good [39:13] faith arguments or speculation, which is [39:15] essential, but long islanders are going to be [39:19] doing at this point, because at the end of the [39:23] day, until we have a dangerous storms and stuff [39:26] like that, that are caused by climate change, which [39:30] again, pseg is not even projecting, um, to meet [39:33] these deadlines by like 2040, which is still [39:36] beyond recommendations to meet this by 20 25, 20 30. [39:40] so again, we are seeing issues with this, but, um, [39:44] I don't think long islanders should be paying [39:47] 30 milli should have paid 30 million for a poor [39:51] system maintenance and stuff like that. [39:54] and I believe that if we need this supplies, we [39:58] could see cost cutting measures like municipal [40:00] bond access department income, and having this [40:03] all be, um, essentially streamlined. [40:05] in my case through suffolk county departments, like [40:08] the public works department and [40:10] infrastructure funding, as well as the long island [40:13] power authority, all of these institutions can do [40:16] a lot more to ensure unionized jobs, lower [40:20] costs, um, safer electric systems, et cetera. [40:23] so to bring this back, and again, I'm really [40:26] trying to be brief here. [40:28] this contract really doesn't address the [40:31] concerns that a lot of us have. [40:33] this contract creates more administrative level jobs [40:36] that would be salaried and protected this, um, [40:39] doesn't ensure that, um, we'd actually be [40:42] addressing as well as the inflation crisis here in [40:46] long island because higher utility costs are part of [40:49] that problem. [40:50] and that's why this crisis goes beyond just keeping [40:53] the lights on so people can afford to actually [40:57] sustain or live on these costs than just access [41:00] another barrier for people to be able to live here. [41:04] and that's really what a lot of this comes down to. [41:09] so people are paying for an efficiency, [41:11] subcontracting, and privatization. [41:13] then we see that climate change, electricity access [41:16] and power redistribution. [41:17] aren't the priorities. [41:18] so again, regardless of good faith arguments, I [41:21] really do think that, um, like, uh, should undergo [41:25] municipalization efforts. [41:26] I think we need to ensure that efforts to make sure [41:30] that this is strictly a public utility and not [41:33] something that is contracted would make this [41:36] far more efficient, far more safer, and far more [41:40] cost effective. [41:41] thank you. [41:42] thank you, antonio. [41:43] uh, next step is charles then eric weltman and then [41:47] margaret mahler will be up next on charles. [41:50] we're going to move you in to panelists view now. [41:54] good evening. [41:55] my name is charles nunez and the ecosocialist [41:58] working group chair of the nassau county chapter, the [42:02] democratic socialists of america and a partner in [42:05] the re-imagined life. [42:06] but coalition, I keep my statement relatively [42:09] brief, but I'm just going to come tonight to say [42:13] transparently I'm off from the time of tropical [42:16] storm. [42:16] esa is he sets failures, which they lied about on [42:20] multiple occasions. [42:21] you all even sat there on the board, calling out to [42:25] your sides lies. [42:27] dan eichorn lie to everyone's faces multiple [42:29] times about the progress we were assured that you [42:33] said had gotten their act together. [42:35] but when hurricane henry was threatening to coast, [42:38] my memory, according to my memory, I remember seven [42:42] to 14 day warnings of failure, potential [42:45] failures. [42:45] you know, power might be also in 14 days. [42:49] I thought pcyc had said they were fixed [42:52] everything, but that's, that's what we heard. [42:54] thankfully for long islanders. [42:56] henry did not hit long island and mind you, it [43:00] hit rhode island and their power was back in one or a [43:05] one to two days. [43:06] I believe, you know, versus the seven to 14 [43:10] days that piece said was warning us about, you also [43:14] said at the beginning of this, that to listen to us [43:18] through the public comments, 90% of the [43:21] comments or for full municipalization. [43:23] tell me how us coming here. [43:26] talking about a renewed contract with p sag was [43:29] listening to us. [43:30] it wasn't, I'm just going to say this in closing. [43:34] if you all vote for this contract, you all should [43:38] resign. [43:38] and if you don't, the legislature needs to step [43:42] in and take over. [43:44] and if they don't, then they should resign. [43:47] thank you. [43:48] okay, eric, weltman followed by margaret [43:50] mahler and then laura mckeller, eric, we're [43:53] going to move you in now, eric, you're on mute. [43:57] sorry about that. [43:59] great. [43:59] my name is eric weltman and I'm a new york senior [44:03] organizer with food and water. [44:05] watch a national non-profit environmental [44:07] organization, food and water watch is a proud [44:10] member of the re-imagined lipid campaign, along with [44:13] the long island, progressive coalition, [44:15] mothers out front or energy, and so many [44:19] incredible activists and allies. [44:20] and we're here to send a message to the lipid board [44:24] and to governor hoeckel long island deserves long [44:28] island needs a publicly owned, controlled and [44:30] managed power authority. [44:32] long island deserves long island needs to sever its [44:35] relationship with pac and g a company with a track [44:39] record, a long track record of failures and [44:42] lies. [44:43] it's time to establish new standards for [44:45] accountability, equity, resilience, and democracy [44:47] in our energy systems, and to create an institution [44:51] that's equipped to meet these standards and one [44:54] that will prevent climate catastrophe by moving the [44:57] region off fossil fuels and transition long island [45:00] to soar and wind power. [45:03] the time has come. [45:04] the time has come for the long island power [45:08] authority to end its relationship with pse and [45:11] g. [45:11] and to finally end decades of failed public private [45:15] partnerships, they have put profit over people, no [45:18] contract, no contract can alter repair or rectify [45:21] the fundamental disconnect between pse and g and the [45:25] region's needs. [45:25] the fact that the proposed contract contains a duty [45:29] of candor requirement is alarming. [45:31] we have to ask pse and g to commit not to lie. [45:36] what if they're lying about not lying, no [45:39] contract can overcome the fact that this is a flawed [45:43] model that is causing widespread widespread [45:45] hardship at great pasta rate pairs. [45:47] long island has been repeatedly battered by [45:50] storms, the intensity and fruit qfc, which are [45:53] heightened by climate change. [45:55] climate change is an existential threat to long [45:58] island. [45:58] creating an urgent need to move off fossil fuels. [46:02] we must stop transporting and burning [46:05] frack gas. [46:05] public power is the means by which we can ensure the [46:10] long island fulfills our legal and moral obligation [46:13] to transition to a hundred percent clean, renewable [46:16] energy. [46:17] we have a new governor. [46:18] we have new board members and even more will be [46:22] appointed the hopeful administration and the [46:25] lipid board have the opportunity to acknowledge [46:28] and move past the mistakes of andrew cuomo and put [46:31] the relationship with psng where it clearly belongs [46:35] in the dustbin of history. [46:37] food and water roster concludes with our call to [46:40] governor cuomo. [46:41] coco now is our moment to re-imagine lippa and [46:44] corporate control and abuse of our energy [46:47] systems and realize the benefits of public power [46:50] and formulas of smoothness or polarization, real [46:53] accountability where liable service, affordable [46:55] power and a transition off fossil fuels. [46:58] thank you. [46:59] thank you, eric, for your comments. [47:01] next, we're going to move in margaret mahler [47:04] followed by laura mckeller and then mike brady will [47:08] be up after laura. [47:10] hi, welcome. [47:11] hello. [47:11] hello. [47:12] all my name is margaret maher. [47:14] I'm a volunteer for food and water watch. [47:17] I'm a long island power authority rate payer as [47:21] well. [47:21] and I just want to put my 2 cents in saying that we [47:26] need public power. [47:27] now this new contract with pse and g does not fix or [47:32] lower outreach. [47:33] we need to manipulate view, sorry, municipalize. [47:36] now we all know how much it costs to live on this [47:40] island. [47:41] it is so expensive between the taxes, the water, the [47:45] gas, the electric, these municipalities should all [47:47] be public. [47:48] we pay high bills that seem to serve stockholders [47:52] over rate payers. [47:53] and this is just unacceptable. [47:55] we had many issues in the past, such as tropical [47:59] storm isis in 2020 pse and g needs to be held [48:03] accountable for their readiness of this storm. [48:06] we know they lied about their preparedness, their [48:09] response and the upgrades it made afterwards. [48:12] we want public power to serve the rate payers, not [48:16] the stockholders. [48:17] I can't even say this enough, who benefit from [48:20] our hard earned money, our money that we make, we are [48:25] giving away to stockholders the amount of [48:27] money that is made millions upon millions [48:30] every year is unbelievable. [48:32] speaking for myself and my neighbors. [48:34] we, the public want the board to terminate its [48:38] contract with pse and g and commit to public [48:41] power. [48:42] utility utilities like power and water should be [48:45] public. [48:45] they should all be public. [48:47] we need to go green to fight climate change. [48:51] we need governor hocal to champion this cause this [48:54] is extremely important. [48:55] we are paying so much money and the benefit to [48:59] us is very, very little. [49:01] it's really upsetting. [49:02] and one other thing, before I close, I don't [49:06] know who cuts the trees or who you hire to cut the [49:11] trees, but it is awful. [49:13] I just want to put that in there. [49:16] I thank you for letting me speak and say my piece. [49:20] thank you very much. [49:22] thank you, margaret laura mckeller, you are up next [49:26] then followed by mike brady and then call [49:29] merchenson after my hi laurie. [49:31] you're in the panelist view. [49:33] you're on mute. [49:34] am I unmuted? [49:35] can you hear me? [49:37] yep. [49:37] okay, good. [49:38] so my name is laura mckeller. [49:41] uh, I am a rate payer in greenlawn, new york. [49:44] I am also a, um, I'm a registered nurse and I'm a [49:49] mother of two teenage boys. [49:51] um, I think one thing that I've heard over and over [49:55] again, and I myself have said in these meetings is [49:59] that we are just all really fed up with pse and [50:04] g we are, we're just done. [50:06] we we're done. [50:07] we are done with this relationship. [50:10] um, not only were they ill prepared and not only was [50:14] their response poor to issais. [50:16] um, we relied too. [50:17] now, if this were any other relationship in my [50:21] life or in my children's lives or my friends' [50:25] lives, I would say just ended if this were an [50:28] obstetrician, for example, um, I would not be setting [50:32] new performance standards. [50:33] I would not be, um, creating a shorter [50:36] contract with him or her. [50:39] I would not be setting any sort of differences in [50:43] risk and compensation. [50:44] I would say this person does not delivery my next [50:48] child. [50:48] um, and I think that's what we need to do. [50:52] um, not only because of what we've seen in the [50:56] past, but because of what we are going to be [51:00] encountering in the future, we are truly at a [51:03] crossroads right now that I think all of us see [51:07] ordinary people like me see, in terms of climate [51:11] change, not just in terms of storms, but we see [51:15] what's going on out west. [51:17] we see the threat to our food. [51:20] we see the threat to our health health. [51:23] we see potential changes as the infectious disease [51:26] of elderly people dying because they're too hot. [51:29] like we see the threats, we cannot turn away [51:33] anymore. [51:33] um, so as we end the relationship with pse and [51:37] g, this gives us an opportunity for a new [51:40] relationship, that public power grants us. [51:43] um, we're also going to have to entirely change [51:47] the way that we produce and consume energy. [51:50] we have to do it. [51:52] there is no option. [51:53] um, and on top of it, the way we consume energy is [51:58] actually going to be more electrified. [52:00] so it's going to be putting even more pressure [52:04] and strain on the infrastructure that is in [52:07] turn, also threatened by these storms that are only [52:11] going to get bigger and bigger. [52:13] um, so in the process, we also need to be creating [52:17] clean energy and efficient energy. [52:19] we need to get away from fossil fuels so that we [52:24] are not exacerbating the problem that is creating [52:27] the storms. [52:28] um, but it's not all doom and gloom. [52:31] like I said, it really is an opportunity for public [52:35] power. [52:35] this is a huge opportunity for us. [52:38] um, we can create new jobs. [52:40] we can make sure that those jobs are going to [52:44] people who have been most unjustly effected by [52:47] climate change by pollution, by all of this, [52:50] by just the unfairness of life itself. [52:54] this is a huge opportunity and we cannot [52:57] rely on a corporate entity to do this. [53:00] this is something that we have to do together as [53:04] communities, as government, as scientists, [53:06] and we need community input. [53:08] we need community members at the table. [53:10] I said before, in other meetings, we know what we [53:14] need. [53:15] we know what we want. [53:17] and when we work together with experts and we work [53:21] together with labor, we can do this. [53:23] we do not need pse and g um, we need to end, um, we [53:29] need to end this relationship and we need [53:32] public power. [53:33] thank you so much for letting me speak. [53:36] thank you, laura, for your comments on next up [53:40] will be mike brady followed by ryan madden [53:43] and then george, povo like, we're bringing you [53:46] in now. [53:47] I, can you hear me? [53:49] we can. [53:50] great. [53:51] uh, my name is michael brady and I am a repair [53:55] from kings park. [53:56] I am also an attorney by profession and I am a [54:00] volunteer with law and progressive coalition and [54:03] cooperation long island. [54:04] I'm here to encourage the board to end leiper's [54:08] relationship with pse and g and to instead pursue [54:11] full municipalization of the long island power [54:14] grid. [54:15] other speakers tonight have. [54:16] and we'll continue to outline for you a variety [54:20] of excellent reasons for municipalization, [54:22] including enormous cost savings, operational [54:24] efficiency, and the overwhelming public [54:26] support that has been expressed in virtually [54:28] every recent meeting of this board. [54:31] as well as into public hearing that was held in [54:35] may your own options analysis shows the [54:37] overwhelming benefit of full municipalization. [54:39] it is abundantly clear that this is the only way [54:43] to go yet, almost immediately after the [54:46] hearing in may this board, perhaps with some strong [54:50] prodding from a certain governor, decided to [54:52] pursue a different path and double down with pse [54:56] and g despite its abysmal performance. [54:59] well that governor is gone now. [55:01] so perhaps we can revisit things and pursuing a [55:04] rational course. [55:05] I'd like to take a different tack and try to [55:09] convince you to change this course because [55:12] entering this contract is a horrible business [55:15] decision. [55:15] as an attorney, I often tell my clients that a [55:19] contract is only as good as the parties that are [55:23] involved in the transaction. [55:24] it is my belief that pse and g is not a good [55:29] partner and cannot be trusted. [55:31] why do I believe that? [55:33] because the lipid board has repeatedly told me, so [55:37] the board has accused pse and g of being woefully [55:41] unprepared for hurricane. [55:42] I say, yes, the board has repeatedly told us that [55:46] pse and g is not meeting the benchmarks that were [55:50] set to ensure that assistance upgrades were [55:52] completed in a timely manner. [55:54] so that such a disastrous storm response never [55:58] occurs again. [55:58] why would you trust pse and g and reward it with a [56:03] new contract? [56:04] well, we're told that this new contract is the [56:08] best deal that lipid has ever had, and that [56:11] includes large compensation penalties at [56:13] pse. [56:14] and g fails us again to that. [56:16] I say, so what, I'm here to tell you that as rate [56:21] payers, we don't want pse and g to reimburse our [56:25] money. [56:25] we don't want them to be paid in the first place. [56:30] what we do want is for our money to go towards a [56:34] durable and reliable power grid. [56:36] we want accessible communications and updates [56:39] in the advent of power outages. [56:41] we want rapid and efficient restoration of [56:44] service. [56:44] we want to pay electric fees that are not among [56:48] the highest in the country. [56:50] we want a utility that is agile and capable enough [56:54] to rapidly complete the critical transition to [56:57] renewable energy as mandated by the climate [57:00] leadership and community protection act. [57:02] as margaret said, we don't want our money going to [57:06] shareholders, which has been happening for far too [57:09] long after we built bailed out lipid, I'm sorry, loco [57:13] so many years ago, um, at a cost that we're still [57:17] paying today. [57:18] what we demand is utility that is responsive and [57:21] accountable to the people we demand public power. [57:24] thank you. [57:26] thank you, mr. Brady. [57:27] uh, next step. [57:28] we'll have ryan madden then george paval and then [57:32] timothy carson after george ryan, we're moving [57:35] you in now. [57:36] can you hear me wonderful. [57:38] um, good evening, everyone and lovely to see everyone [57:42] again this week. [57:43] uh, my name is ryan madden. [57:45] I'm the sustainability organizer with the long [57:48] island progressive coalition. [57:49] uh, we are a grassroots community-based [57:52] organization founded in 1979. [57:53] we fight for structural change at the local state [57:57] and national levels to attain racial justice, [57:59] build community wealth and realize adjust, transition [58:02] to a hundred percent renewable energy future [58:05] beginning in november of, uh, 2020, the long island, [58:08] progressive coalition, suffolk county and nassau [58:11] county chapters of dsa and food, or waterwatch came [58:14] together to urge the long island power authority, [58:17] determinate his contract with pse and g long island [58:21] municipalize and democratize in the [58:23] aftermath of tropical storm, sis, which resulted [58:26] in a 645,000 long island residents without power [58:29] for on average, more than two to seven days. [58:32] over the past, we have built a network of [58:36] supporters through the re-imagined lipid [58:38] statements consistently mobilized rate payers to [58:40] weigh in at monthly board meetings, held forums on [58:44] the benefits of public power with diverse [58:47] stakeholders and decision makers created toolkits. [58:49] this for additional public action, worked with [58:52] relevant elected officials to amplify those issue [58:55] statewide and publish op-eds and letters to the [58:58] editor and multiple media outlets and light all, all [59:02] of this. [59:02] um, the groundswell of community elected and [59:05] public support, um, for, uh, the full [59:08] municipalization of the long island power [59:10] authority. [59:11] uh, we are here to say that this new contract [59:14] does not fix the fundamentally flawed model [59:17] of our utility and that we need to meet as flies. [59:22] it is impossible to comment on this reform [59:25] contract without noting the structural issues [59:27] surrounding this. [59:28] we are also concerned as was raised earlier that [59:31] this contract is moving forward. [59:33] uh, moving ahead, uh, before the attorney [59:36] general finishes or investigation into whether [59:38] pse and g has failed sis response broke state laws, [59:42] uh, and before we know the responsiveness of the new [59:46] storm outage management computer system that pse [59:49] and g has been collected to deliver on, we urge the [59:53] lipid board to delay this vote and suspend this [59:57] process until they have more information on which [1:00:00] to make a sound decision as was noted earlier, too, [1:00:04] um, and reflected by, um, by other speakers, is that [1:00:08] decisions about the future of the long island power [1:00:11] authority and its relationship to pse and g, [1:00:15] um, should belong to the rate payers of this region [1:00:19] and the rate payers of this regional loan and [1:00:22] former governor. [1:00:23] andrew cuomo only had his legacy in mind when he [1:00:27] pushed light pcyc to renew terms earlier in july. [1:00:31] he, in that decision deliberately ignore long [1:00:33] island rate payers and elected officials, um, and [1:00:37] instead exerted his influence on behalf of pse [1:00:40] and g as was mentioned, his resignation, this [1:00:43] entire deal has been called into question, and [1:00:46] we believe the onus is now on governor. [1:00:49] hocal just your course back towards public power. [1:00:52] she must reject her predecessors failed vision [1:00:55] for our region and embrace a power proven model for [1:00:59] ensuring long island enjoys, reliable, [1:01:01] affordable, and renewable power, regardless of the [1:01:04] content of this new contract, a decision to [1:01:07] move ahead and not commit to public power, um, would [1:01:11] be an insult long island and rockaway's [1:01:14] communities, the dereliction of [1:01:15] responsibility to the need of democratic management [1:01:18] of our system and a grave mistake as the climate [1:01:22] crisis worsens, as we know, lipid can save [1:01:25] nearly $1 billion over the next day decade through [1:01:29] this process. [1:01:30] so instead of bonuses to unaccountable managers and [1:01:33] dividends to distant stockholders, we could see [1:01:36] lower rates and improved services for customers. [1:01:38] it was communicated earlier this year, uh, [1:01:41] during a new york state senate budget, hearing [1:01:44] that life, uh, had in its power, the ability to [1:01:48] municipalize on its own, once the tentative [1:01:51] agreement was struck in july, this assertion was [1:01:54] walked back and pushed to albany to decide while we [1:01:58] will work with albany to make necessary legislative [1:02:01] changes. [1:02:02] we asked that lipid continue to flesh out [1:02:05] options for and support the development of a [1:02:08] roadmap to a fully system. [1:02:10] if the lipid board does move ahead with this [1:02:13] contract, it must at the very least commit to not [1:02:17] renewing it. [1:02:18] after 2025 and began working with community [1:02:21] stakeholders right now to build a public power [1:02:24] system, we deserve lipid must also heat the call to [1:02:28] engage in more robust, intentional community [1:02:30] engagement in the conduct of utility operations. [1:02:33] while these public comment sessions are [1:02:36] appreciated and vital, they also feel somewhat [1:02:38] insincere by their impact. [1:02:40] maybe not by their intense, the public had [1:02:43] less than 30 days to read a 300 page contract, [1:02:47] digest it, develop comments on it, and then [1:02:50] deliver those comments. [1:02:51] the majority of the turnout for these, uh, um, [1:02:55] sessions is based on the work of community [1:02:58] organizations like ours and not the efforts of the [1:03:02] utility to seek input. [1:03:03] and as seen during the options analysis comment [1:03:06] sessions, public input does not translate into [1:03:09] utility response. [1:03:10] it often feels that proposals put before us to [1:03:13] comment on our decisions already made. [1:03:16] we need a democratic lipid that is accountable to our [1:03:20] region's communities. [1:03:21] a lipid that is led by those most impacted by [1:03:24] decisions concerning our energy system. [1:03:26] that includes rate payers, workers, municipalities, [1:03:29] community organizations, low-income households, and [1:03:31] environmental justice communities. [1:03:32] we must ensure that those who use pay for and work [1:03:36] for the system have a say in how it runs despite the [1:03:41] flawed model utilized and its conduct lipid is, and [1:03:45] probably claims to be a public power utility. [1:03:48] and that must mean the operation management and [1:03:51] policy making of the electric utility [1:03:54] exclusively by the public for the public interest, [1:03:57] which can only be the case with ongoing and [1:04:00] meaningful engagements. [1:04:01] lipomas heed the call for public power, which only [1:04:05] grows louder every day on long island throughout the [1:04:08] state and across the country. [1:04:10] we can not afford more delays, further delay as [1:04:14] for their time money and resources waste on a [1:04:17] utility model that is structurally unreliable [1:04:20] and accountable and more expensive, more expensive. [1:04:22] none of this is addressed by the proposal before us [1:04:26] today, and we deserve better. [1:04:28] thank you for your time. [1:04:31] thank you for your comments, brian. [1:04:33] I was certainly always going to do want to [1:04:37] acknowledge the tremendous amount of time that ryan [1:04:40] has spent, and he's been at every life, a board [1:04:44] meeting and follow these first so closely. [1:04:47] so I do appreciate that. [1:04:49] uh, so george will be next followed by timothy [1:04:53] carson and then william novella, george, we're [1:04:55] bringing you in now, george you're on mute. [1:04:59] hey everybody. [1:05:00] it's george paul, val from all our energy executive [1:05:03] director. [1:05:04] uh, look, all our energy is a long island energy [1:05:07] and environment protection non-profit organization. [1:05:09] and I want to thank you, tom. [1:05:12] and the board for all of the work that you have [1:05:17] parked to improve our utility over the past 16 [1:05:20] months in the push to move to what was for everyone [1:05:24] involved, the obvious choice of public power. [1:05:27] it's not that this contract doesn't make an [1:05:30] improvement. [1:05:31] the problem is not just about the contract, nor [1:05:34] the contractor. [1:05:35] it's the system of a public private [1:05:38] partnership. [1:05:38] it just continues to leave long islanders vulnerable, [1:05:41] to storms in favor of profits and business [1:05:44] interests above rate payer interests and leaves us [1:05:48] not ready for the future. [1:05:50] that system just has to go. [1:05:52] we need a full public takeover of pseg long [1:05:55] island operations to the municipal and accountable [1:05:58] lipid to gain greater grid security, cost reduction, [1:06:01] resiliency, responsiveness, and [1:06:02] accountability. [1:06:03] any new contract merely just extends the current [1:06:06] problems, risks, our safety and delays. [1:06:09] the inevitable transition that we truly thank the [1:06:12] past and presently outgoing board members for [1:06:15] their service with much of the board to be new [1:06:19] members early in the year, we do feel having them [1:06:23] decide such an important matter and then leave in [1:06:26] the coming weeks, just diminishes the great work [1:06:29] the board has done, and it diminishes accountability [1:06:32] that has been so missing from this entire process. [1:06:36] this regression back to unaccountability was [1:06:38] dropped like a bomb on all of us by the disgraced [1:06:43] former governor, and for better, for worse. [1:06:45] this allows his outgoing appointees to approve his [1:06:49] backroom deal and walk away. [1:06:50] and likewise we'll allow any new board members [1:06:54] simply to point to the past board, uh, leaving [1:06:57] the rest of us vulnerable for this, uh, [1:07:00] accountability, uh, that will be missing. [1:07:03] additionally, those contract on paper allows [1:07:05] for more metrics for accountability. [1:07:07] will the board actually go out of their way to fully [1:07:12] enforce it? [1:07:12] when we will be faced with the same question then, [1:07:16] which is who will control our grid. [1:07:19] if an unhappy contractor holds all the power and [1:07:23] stands between us and our grid, the provision for [1:07:26] nearly a year severance as well in management fees [1:07:30] for failure on such a short term contract still [1:07:33] leaves us in diminishing returns. [1:07:35] it might be a bonus for them to even get fired. [1:07:40] at some point, the proof of this is, is this being [1:07:44] a possible outcome is pseg long island testifying to [1:07:47] the new york state assembly a month after [1:07:51] this, uh, contract was announced that everything [1:07:53] was under control and not going to be a problem. [1:07:57] and then just a few days later with hurricane henri [1:08:01] coming up the coast, we were told to prepare for [1:08:05] 10 to 14 days without power. [1:08:08] wait, what? [1:08:09] anyway, not withstanding that there still is no [1:08:12] guarantee. [1:08:12] they are going to be a willing and cooperative [1:08:16] participant in any transition away from them [1:08:19] ever. [1:08:19] and I see little difference, whether it [1:08:22] happens sooner or later, they have done much to [1:08:25] prove that they will not act in a way that benefits [1:08:30] us as, uh, as, as shown by their public duty attested [1:08:34] in accuracies and untruths, um, which I've [1:08:37] just mapped that past the breaking point. [1:08:39] we cannot allow them to continue to hold our power [1:08:43] over us. [1:08:44] we need to take it back. [1:08:46] this resolution to the ongoing problems though, [1:08:49] exemplifies why we believe that the lipid board and [1:08:53] ultimately governor hogan have a responsibility to [1:08:55] steer our course forward towards public power. [1:08:58] thank you all so much. [1:09:00] thank you, george timothy carson. [1:09:02] you're up next followed by william novella then [1:09:05] jennifer green. [1:09:06] good afternoon, everybody. [1:09:08] uh, my check. [1:09:09] everyone can hear me right. [1:09:11] cool. [1:09:11] could even hear me, everybody. [1:09:13] I live in cinereach. [1:09:15] my name is tim and I'm an organizer with the suffolk [1:09:19] county democratic socialists of america. [1:09:21] this reformed contract with peace egg is a half [1:09:25] measure when leiba needs to use a full measure. [1:09:28] the contract needs to be terminated. [1:09:30] the failed public private partnership model needs to [1:09:34] go and like it needs to be fully democratized, a [1:09:38] shorter leash on pse and g doesn't mean much when [1:09:41] public power is a better deal for long island. [1:09:45] maybe there's a $60 million fine. [1:09:47] like you said, mr. Falcon, but lipid zone analysis [1:09:51] says it would save nearly a billion dollars over the [1:09:55] next decade. [1:09:56] if the piece of that contract was terminated in [1:09:59] favor of full municipalization, the only [1:10:01] reason the contract was agreed upon the first [1:10:05] place is former governor cuomo. [1:10:07] so why should we settle for this? [1:10:10] exactly long island can make such a powerful [1:10:13] statement by severing ties with wasteful and [1:10:16] inefficient management of psa and siding with the [1:10:19] people that serves stakeholders and [1:10:21] ratepayers and climate change is unfortunately [1:10:23] here to stay. [1:10:24] we can expect some storms in the future to be worse [1:10:29] than tropical storms that we've witnessed in the [1:10:32] past. [1:10:32] personally, I want us to be prepared in the best [1:10:36] way we can not by having a private management service [1:10:40] provider, but a publicly owned and operated [1:10:43] utility, which of course already service about 15% [1:10:46] of americans are 13% cheaper and have 46% fewer [1:10:49] power outages. [1:10:50] the benefits of public power check, all the [1:10:53] boxes. [1:10:54] the choice is easy. [1:10:55] terminate the contract with peace sag and let's [1:10:59] democratize our power system. [1:11:00] thank you. [1:11:01] thank you, timothy. [1:11:02] uh, william develo will be up next followed by paul [1:11:06] merchenson. [1:11:07] I know, um, there were some folks that had their [1:11:11] hand up to put them down. [1:11:13] um, if there are people that would like to speak [1:11:17] on this matter, I would ask, please raise your [1:11:21] hand, william and the vela. [1:11:22] we are gonna move you in. [1:11:25] okay. [1:11:26] thank you. [1:11:26] my name is william novella. [1:11:28] I am a member of the nassau county chapter of [1:11:32] the democratic socialists of america. [1:11:34] and you know, when I came here tonight, there are a [1:11:39] few words that I had when I thought of pse and g um, [1:11:44] one was albatross. [1:11:45] the other was parasite, and either one was changed [1:11:48] by the presentation presented the speed, [1:11:51] meaning by life. [1:11:52] uh, there was absolutely nothing in that [1:11:55] presentation that demonstrated that pse and [1:11:57] g is performance in their time. [1:11:59] contracted out by life, uh, has done anything to [1:12:03] benefit really long island and has done nothing but [1:12:07] cost taxpayers much and bring harm to the people [1:12:10] in our communities. [1:12:11] excuse me, the relationship here seems to [1:12:14] be that lipid seems to be meaning to pay more and [1:12:18] more, create more and more metrics in order to [1:12:22] oversight pse and g for the work that they're [1:12:25] supposed to be doing on their own, creating more [1:12:29] costs for a mill managed relationship. [1:12:32] that seems to be quite more contractual and quite [1:12:35] frankly, abusive for the people of long island who [1:12:39] are clearly having this thrusted upon them. [1:12:41] because I would say that there are very few people [1:12:45] from the ordinary public. [1:12:47] you you're to actually give public testimony. [1:12:50] many of us who are privileged to be here this [1:12:54] evening, and quite frankly, you know, having [1:12:56] less than two months to provide public testimony [1:13:00] on it is very disingenuous on your part to push [1:13:04] forward such a contract on people. [1:13:06] so it seems to me that there seems to be very [1:13:10] little to be done here. [1:13:12] and this seems to be a decision that is going to [1:13:16] be pushed down no matter what happens after [1:13:20] december 9th. [1:13:20] so I just wanted to express that clearly [1:13:24] universalization would be the best course of action [1:13:27] that pse and g needs to be eliminated as a working [1:13:31] partner with lipid as soon as possible. [1:13:34] and if that is not the case and the flippa [1:13:38] refuses to do that, then it is up to the public and [1:13:42] to the state government to thrust a decision to [1:13:46] change that. [1:13:47] and that's where I'm at. [1:13:49] thank you. [1:13:49] and have a [1:13:51] good evening. [1:13:52] thank you, william. [1:13:53] next step will be paul merchenson, uh, followed [1:13:57] by jeremy joseph, and then jennifer green. [1:13:59] okay. [1:14:00] call your unmute. [1:14:01] okay. [1:14:02] thank you. [1:14:02] um, my name's paul mark wilson, uh, I'm uh, on the [1:14:07] steering committee of transition town, port [1:14:09] washington. [1:14:10] we are a local community group on the port [1:14:13] washington peninsula, where our mission is to, [1:14:16] um, make our community safe, secure, sustainable, [1:14:19] and resilient in the face of climate change. [1:14:22] and clearly this issue is, uh, you know, uh, dear to [1:14:26] our mission of accomplishing those [1:14:28] objectives. [1:14:28] uh, so we're really urging, um, light, but not [1:14:32] to make a rush to judgment. [1:14:34] please let the attorney general finisher [1:14:37] investigation delay your vote until all the [1:14:39] information is there. [1:14:41] and I believe, I hope that the timing of this public [1:14:45] session is to allow you to hear and gain enough [1:14:49] support from the public to do that and to move down a [1:14:54] more responsible path, secure and affordable [1:14:56] power. [1:14:56] it's too important to be subject to private profit. [1:15:00] um, I was, you know, I was struck as eric weldon was [1:15:05] by the phrase duty of candor. [1:15:07] and I just have to say that, uh, I've spent over [1:15:12] 40 years, um, in the, in the private sector [1:15:15] managing, uh, large management and, uh, [1:15:18] capital projects and a lot all over the world and [1:15:21] never have I come across that phase. [1:15:24] now I understand in the public sector that there [1:15:28] are regulations and there are different things that [1:15:31] affect, uh, contracts, but I've also worked in highly [1:15:34] regulated industries in highly regulated [1:15:36] environments. [1:15:37] and that phrase to me is a exclusionary phrase. [1:15:40] it just indicates that there is no level of [1:15:44] trust. [1:15:44] and you've, you've indicated that in [1:15:47] yourselves, in the past dealings, this is not an [1:15:50] organization pse and g that's forthcoming and [1:15:53] honest and trustworthy, and they need to be [1:15:56] eliminated on that basis if not poor performance. [1:15:59] so, um, it also speaks if that, if that was in prior [1:16:04] contract, it speaks to the bankruptcy of the model, [1:16:07] the private public partnerships. [1:16:09] and again, municipalization has a [1:16:11] much better track record in terms of performance [1:16:15] and, uh, and course delivery. [1:16:17] so again, it's, it's just, I feel for you because you [1:16:21] have to be shaking your heads off screen and [1:16:24] saying, yeah, we know this, we know this, we [1:16:28] know this, but you obviously have a lot of [1:16:31] other things to, uh, uh, you know, to navigate in [1:16:35] terms of your decision making. [1:16:37] but, uh, the public voice has to be an important [1:16:41] part of that. [1:16:42] so, you know, as, as, as have said, public power is [1:16:47] not new. [1:16:48] it works. [1:16:48] it's something whose time has come, it's too [1:16:52] important, uh, uh, to, to put profit over a public [1:16:55] safety. [1:16:56] and I just want to say on a personal note that, um, [1:17:01] in the park section of port washington, where I [1:17:04] lived during, uh, ida, three of my neighbors, [1:17:07] their basements completely flooded. [1:17:09] now, I'm bringing that up, not to say that, that, [1:17:13] you know, that's a direct result of a pse and g is [1:17:18] mismanagement or that they all lost power, but it [1:17:21] indicates the severity of the climate events that [1:17:25] were facing these, uh, black swans are a hundred [1:17:28] year events that you're talking about. [1:17:30] they are totally unprepared to deal with [1:17:33] that. [1:17:34] we need a totally different model that can, [1:17:37] that can handle events that cannot be foreseen [1:17:40] because every year in every community we see [1:17:43] these is, there are things we read in the papers. [1:17:47] these are the things people are experiencing [1:17:50] and people feel threatened. [1:17:51] this is not just about their rates. [1:17:54] it's about their lives, their security, even if [1:17:57] they don't drown in their basements, as other people [1:18:01] have done in the region, they're at risk of living [1:18:05] in homes that have mold and have other, uh, health [1:18:09] and safety results as, as a result of climate [1:18:12] events, living and occupying a home that has [1:18:15] gone without power for any substantial length of [1:18:18] time, also prevents those risks. [1:18:20] so these are things that are affecting people's [1:18:23] safety, security, and lives. [1:18:25] and I just want to leave it at that because I think [1:18:30] that the personal element is very important. [1:18:33] you have safety of people and their livelihood in [1:18:36] your hands. [1:18:37] please make the responsible decisions. [1:18:39] thank you. [1:18:40] thank you. [1:18:41] call, uh, next up will be jeremy joseph followed by [1:18:45] jennifer green and then amber ruth her, uh, again, [1:18:48] a reminder, if you are on and would like to comment, [1:18:53] you do need to raise your hand to do so. [1:18:57] jeremy you're being brought in now. [1:18:59] uh, so I guess my guiding principle for this is [1:19:03] pretty simple. [1:19:04] uh, utilities are a service to the public and [1:19:08] they should be publicly owned. [1:19:09] uh, in contrast investors in private corporations [1:19:12] like pseg have one motive it's making profit. [1:19:15] uh, you cannot provide an essential service to [1:19:19] people while operating under a profit motive. [1:19:21] these things are fundamentally opposed. [1:19:23] uh, a public utility should be accountable for [1:19:26] whether it is accountable to the people it serves. [1:19:30] uh, whereas a privately operated utility only [1:19:33] answers to its shareholders. [1:19:34] uh, if pseg were completely competent in [1:19:37] its current role, uh, hypothetically speaking, [1:19:39] they would still fundamentally not be able [1:19:42] to serve the needs of our communities. [1:19:45] uh, one of the greatest needs, if not the greatest [1:19:49] is to transform our energy system into one that is [1:19:53] environmentally sustainable. [1:19:54] uh, no one should trust a private corporation to [1:19:57] drive these critical changes. [1:19:59] they're only interested in these changes as long. [1:20:02] it is, it is profitable for them. [1:20:05] uh, I'm not willing to leave our environmental [1:20:08] fate in the hands of shareholders. [1:20:10] um, now as it stands, uh, pseg has not shown [1:20:14] themselves to be a competent partner. [1:20:17] they have a long history that falls well short of [1:20:21] our expectations, and they have not even provided [1:20:24] adequate service under a current agreements. [1:20:26] so why are we extending more grace to a [1:20:30] relationship that shouldn't exist in the [1:20:32] first place? [1:20:33] um, so I know tonight and even over the however many [1:20:37] months, this process has gone on that. [1:20:40] you've heard from private citizens, from advocacy [1:20:43] groups, even from politicians like [1:20:45] legislator fleming tonight, who is [1:20:47] extensively very connected to this sort of issue. [1:20:50] um, and if overwhelmingly, oppose, continuing this [1:20:52] relationship with pseg, the only people I've heard [1:20:56] speaking in favor of this contract are those who [1:20:59] directly benefits from this con, this, this [1:21:02] relationship rather, uh, I don't really see any [1:21:05] ambiguity and these discussions, uh, all [1:21:07] community stakeholders would benefit from a full [1:21:10] month municipalization of our power grid. [1:21:13] and this relationship with p seg should end. [1:21:16] thank you. [1:21:17] thank you, jeremy. [1:21:18] uh, jennifer green, then amber ruther and then [1:21:21] billy roberto. [1:21:22] and I would remind everyone, if you do have [1:21:26] an interest in speaking tonight, raise your hand. [1:21:29] there's a button on the bottom of the screen on [1:21:33] zoom. [1:21:33] somebody had suggested we point that out in case [1:21:37] there was some confusion. [1:21:38] so jennifer, we're bringing you in now. [1:21:41] thanks soundcheck. [1:21:42] can I be heard? [1:21:44] we can hear you. [1:21:45] great. [1:21:46] hello, and thank you all for the opportunity to [1:21:49] speak. [1:21:49] turn on my camera. [1:21:51] there we go. [1:21:52] this is my first time at a public hearing and I will [1:21:57] be brief. [1:21:58] I am a longtime rate payer in bellport. [1:22:01] I'm also a member of suffolk county, democratic [1:22:04] socialists of america, and I'm the daughter of an [1:22:08] energy economist who studied utilities among [1:22:10] other things. [1:22:11] and if he were alive today, I know he'd be here [1:22:15] speaking to you too. [1:22:17] so I'm here tonight to add my voice to the many who [1:22:21] are calling for full municipalization of long [1:22:24] island's power third-party management. [1:22:26] isn't what we need publicly owned utilities, [1:22:28] better on numerous counts. [1:22:30] and when I learned that the former governor may [1:22:34] have exerted undue influence undemocratic [1:22:35] interference. [1:22:36] I was disturbed. [1:22:37] we deserve better. [1:22:38] I, and so many others don't want to see you vote [1:22:43] in favor of this contract. [1:22:45] we want life, but to commit to public power. [1:22:48] thank you. [1:22:49] thank you, jennifer and birther will be next and [1:22:53] then followed by billy rubber king. [1:22:56] hello, my name is andrew ruther and I'm with [1:22:59] alliance for a green economy, which is a member [1:23:03] of the statewide public power in new york [1:23:06] coalition, as well as an intervener in utility rate [1:23:09] cases around the state. [1:23:11] um, and I'm here to ask for an end to like this [1:23:16] contract with pcyc in favor of fully public [1:23:19] power that is democratically controlled [1:23:21] for now. [1:23:21] I urge the wipe of board to delay this vote, [1:23:25] suspend this process and fully commit to developing [1:23:29] a roadmap for public power. [1:23:31] we will also be working on developing legislation to [1:23:34] implement public power with the real logic [1:23:37] reimagine lipid coalition, since legislation is [1:23:39] clearly needed at this point, this new contract [1:23:42] with p sec, well making minor reforms does nothing [1:23:46] to address the root of the issue with their poor [1:23:50] performance, that their for-profit monopoly, who [1:23:52] profit for providing an essential service because [1:23:55] of this, no matter how much we try to micromanage [1:23:59] them with complex incentives, which [1:24:01] essentially amounts to doing their job for them. [1:24:04] and no matter how exhaustively we spell out [1:24:07] their responsibilities in a contract, they will [1:24:10] always have an incentive to prioritize their [1:24:13] profits over workers, rate payers in the environment. [1:24:16] and they will always have an incentive to find [1:24:20] loopholes to lie and misreport metrics to do [1:24:23] the bare minimum in terms of service, to defer basic [1:24:27] grid maintenance and to operate with a skeleton [1:24:30] crew of workers who are then unable to restore [1:24:33] power quickly during climate disasters. [1:24:35] so just tropical storm as aas, and then intervener [1:24:39] and utility rate cases around new york. [1:24:42] and I've seen the ways in which complex performance [1:24:45] metrics such as earnings adjustment mechanisms have [1:24:48] largely failed to address performance issues and [1:24:51] have only led to increased rates for rate pairs at a [1:24:55] time when over a million new yorkers already can't [1:24:59] afford their utility bills. [1:25:00] there's also no true way to hold. [1:25:03] [inaudible] accountable to the people they asked [1:25:06] sensibly serve. [1:25:07] while the dps may find them for more poor [1:25:10] performance, they're unable to find them an [1:25:13] amount that would severely impact share holder [1:25:16] profits, because then psa's cost of capital [1:25:19] would go up harming rate payers, and they may even [1:25:23] become unable to raise the capital, but they need to [1:25:26] function a basic human need. [1:25:28] that's a national monopoly should never be left up to [1:25:32] a for-profit and long islanders have been harmed [1:25:36] by the impacts of failed public private [1:25:38] partnerships for far too long. [1:25:40] we've seen the worst case scenario of what can [1:25:44] happen in places like texas or the energy people [1:25:47] need to survive is treated as a commodity to profit [1:25:51] from instead of as a human, right. [1:25:54] there's a reason that p sag has poor risk [1:25:58] management. [1:25:58] it's because they know the biggest risks of their [1:26:01] utility operations. [1:26:02] the risks of climate change, the risks of [1:26:05] safety issues for workers and the risks of blackouts [1:26:09] that will force people to miss work through his food [1:26:13] and medication, or even freeze to death will fall [1:26:16] on the backs of long islanders, not on [1:26:20] shareholders in any private monopoly, risks [1:26:22] and costs are socialized and profits are [1:26:25] privatized. [1:26:25] peace is the only utility in the country that [1:26:29] operates with a public private partnership model. [1:26:32] and there's a reason for that. [1:26:34] it doesn't work in the words of assembly member, [1:26:38] doug smith. [1:26:38] we have a frankenstein monster of utilities. [1:26:41] it's the worst of both worlds. [1:26:44] life is unaccountable to the people and we have the [1:26:47] monopoly of peace egg, which under the current [1:26:51] structure is guaranteed to make a profit while [1:26:54] utilizing lipos nonprofit status. [1:26:55] it's reprehensible that the options analysis, [1:26:58] which clearly showed that a fully public system was [1:27:01] by far the best option for rate payers and that the [1:27:06] public hearings were around 90% of testimony [1:27:08] was in favor of public power. [1:27:11] it was essentially ignored and overruled by a [1:27:14] backroom deal made by disgraced former governor [1:27:17] andrew cuomo. [1:27:17] we believe the onus is now on governor hoco to steer [1:27:22] a chorus back toward public power. [1:27:24] she must reject your predecessor. [1:27:26] so's failed vision and embrace a proven model for [1:27:30] ensuring long island has reliable, affordable, and [1:27:33] renewable power. [1:27:33] why should long island rate pairs be forced to [1:27:37] pay 65 to $75 million more per year for public [1:27:41] private partnership that continually fails them? [1:27:43] u s the u s already has 2000 fully public [1:27:47] utilities are electric co-ops and we know they [1:27:50] work. [1:27:51] we don't need to guess on average, they're 13% more [1:27:55] affordable and have passed the average direct outage [1:27:58] duration times of private utilities. [1:28:00] public utilities also have more freedom to innovate. [1:28:03] many have expanded, renewable energy and [1:28:05] electric heat pumps more quickly than private [1:28:08] utilities. [1:28:08] and chattanooga's electric power board was the first [1:28:12] to invest in fiber optics, laying the groundwork for [1:28:15] world-class grid. [1:28:16] and that has reduced power outages by 60% and save [1:28:20] this city close to $60 million annually. [1:28:23] we know public ownership in and of itself is not a [1:28:27] panacea. [1:28:28] we also need robust democratic governance [1:28:30] mechanisms to ensure that the interest of workers [1:28:33] rate payers reliability and the environment are [1:28:36] balanced. [1:28:36] that's why I also support the proposal to add an [1:28:40] observatory and an elected light lipid board that [1:28:43] would foster public engagement. [1:28:45] people that are tired of spending hours at sham [1:28:49] public hearings, where they have no real voice or [1:28:52] influence this board has a choice to make vote in [1:28:56] favor of the contract and betrayed like this rate [1:29:00] pairs or cut ties with pcyc and commit to fully [1:29:03] public power on long islands. [1:29:05] I urge you to do the ladder. [1:29:08] thank you. [1:29:09] thank you, amber. [1:29:11] uh, next step is billy roberto. [1:29:13] uh, at this point, following billy, uh, there [1:29:16] are no other members of the public than currently [1:29:20] have their hands raised. [1:29:21] so I would encourage anyone that is here that [1:29:25] has not yet spoken that would like to please raise [1:29:29] your hand. [1:29:29] now we're going to bring billy in right now. [1:29:33] good evening. [1:29:34] my name is billy [inaudible]. [1:29:36] I'm a member of mothers out front and have been a [1:29:40] homeowner in huntington station for 25 years. [1:29:43] I have lived through life, a key keyspan like the [1:29:47] national grid and lipid pc. [1:29:49] and I can tell you the public private model does [1:29:53] not work. [1:29:54] how many times does the model have to fail before [1:29:58] we rejected in favor of a fully public liper? [1:30:01] yes, this contract is better than the previous [1:30:04] one, but a less flawed contract cannot fix a [1:30:08] totally flawed model. [1:30:09] I will not belabor what has gone wrong. [1:30:12] others. [1:30:13] I've already done that. [1:30:14] what I will do is share my vision of what we need [1:30:19] from an electric utility and what life it can be. [1:30:23] if the cheapest one is the one we don't use, then the [1:30:28] cheapest private partner is none. [1:30:30] libre can do better as a municipal utility, but how [1:30:33] we redesign lipase key. [1:30:35] that is why I'm part of the re-imagined life. [1:30:39] a coalition. [1:30:40] we are calling on governor hochul to support us in [1:30:44] pursuing a path to an innovative, fully public [1:30:47] utility model. [1:30:48] the light by electric rate payers. [1:30:50] I believe that with the legislation being prepared [1:30:53] with the help of re-imagined lipid [1:30:56] coalition, we can have a light, but that will [1:30:59] become all we needed to be. [1:31:01] we need a customer focused utility that is [1:31:05] accountable, reliable, transparent, and equitable [1:31:07] with more public input and better leadership in [1:31:10] decarbonizing our buildings. [1:31:11] we need a light bulb that answers to its customers. [1:31:15] we need leadership focused on moving aggressively [1:31:18] towards electric electrification and the [1:31:19] greening of our grid. [1:31:21] our future lies in electrification. [1:31:23] and for that, it needs to be reliable and renewable. [1:31:27] we need to revise the rate structure and make it [1:31:31] totally transparent. [1:31:32] as it stands now, delivery and service charges are [1:31:35] skewed lower for fossil fuel users and higher for [1:31:39] all electric homes. [1:31:40] as the state moves into electrifying all business, [1:31:43] all buildings, we must have a rate structure that [1:31:47] shortages customers for what it actually costs to [1:31:50] deliver service. [1:31:51] this should be the same for both me and my [1:31:55] neighbors, but I pay more because I heat with an [1:31:59] electric heat pump volume metric consumption costs [1:32:02] can be recovered via charge, separate from the [1:32:05] delivery charge. [1:32:05] your current rate plan for 2022 creates a quote solar [1:32:09] tax for new solar adopters. [1:32:11] if instead, the basic service charge a per day [1:32:15] rate included all the costs associated with the [1:32:18] operation and maintenance of electric grid, [1:32:20] including the cost of debt service and the transition [1:32:24] to a new bubbles, but not the amount of kilowatt [1:32:28] hours consumed. [1:32:29] it would create a level playing field for all. [1:32:32] after all those with net metered solar systems like [1:32:36] me utilize the grid to and should pay for its upkeep, [1:32:40] as it is those who make this transition early, [1:32:44] like me are being penalized by the system [1:32:47] charges. [1:32:47] while those who remain on fossil fuels are [1:32:50] unintentionally incentivized to stay on [1:32:52] them. [1:32:53] this works against the goals of the climate [1:32:56] leadership and community protection act and light [1:32:59] bulb because the leica will benefit from the [1:33:02] increased consumption as electrification advances. [1:33:04] I trust that as we move into the future, both [1:33:08] municipalization and a new rate structure will be [1:33:11] instituted for the betterment of our children [1:33:13] and their children. [1:33:15] thank you. [1:33:16] thank you, billy. [1:33:17] uh, we did have one additional hand raised a [1:33:21] christian array. [1:33:21] we were going to bring in right now. [1:33:25] here we go. [1:33:26] hi, my check. [1:33:27] cool, good evening. [1:33:28] my name is krishna house and I am the co-chair of [1:33:33] suffolk county. [1:33:34] dss looked so a working group, suffolk county dsa [1:33:37] is a full partner in the public power, new york [1:33:41] coalition and to re-imagine the lipid [1:33:43] campaign, the lipid board members zoned findings [1:33:46] after tropical storm [inaudible] are enough to [1:33:49] disqualify pisa from handling our electric [1:33:51] grid. [1:33:52] yet the lipid board is poised to hand it right [1:33:56] back to the company that failed to take care of it [1:34:00] further. [1:34:00] the board determined that repairs can save nearly a [1:34:04] billion dollars over the next decade. [1:34:06] if it terminated the contract with pcyc, they [1:34:09] therefore have the responsibility to explain [1:34:12] why that money will be going to management fees [1:34:15] and not improving our infrastructure. [1:34:17] there are forms list open the terms of the contract [1:34:21] are positive, but we have no confidence that they [1:34:25] will be fully implemented. [1:34:27] pcyc has continued to lie and slow roll. [1:34:30] its promised improvements after sies and we are [1:34:33] still left in the lurch. [1:34:35] tonight is the only say we like the repairs we'll [1:34:39] have in the decision. [1:34:40] when we spoke last summer, we were nearly unanimous [1:34:44] and asking them like, [inaudible] full [1:34:46] municipalization. [1:34:47] yet you members of the light bulb board ignored [1:34:50] us. [1:34:51] when governor cuomo called you listen officially, [1:34:53] cuomo's no longer in charge yet. [1:34:56] this contract has his fingerprints all over it. [1:34:59] now with less than a month until your terms expire, [1:35:03] you're carrying out the disgrace governors [1:35:05] commands without second thought. [1:35:07] fortunately, when you municipalize, we will end [1:35:09] the days of points of boards that ignore to [1:35:13] people. [1:35:13] and we will democratize like was born then and [1:35:17] will be cleared that if anyone wants to take [1:35:20] leadership of our electric grid, they will have to [1:35:24] listen to liberate pairs, not political leaders. [1:35:27] thank you. [1:35:28] thank you, christian. [1:35:29] okay. [1:35:29] this time we have no one else lined up in the queue [1:35:34] to speak one last opportunity for anyone [1:35:37] that may have missed the raise hand function in [1:35:41] zoom. [1:35:41] okay. [1:35:41] being none on tom, I will turn it back over to you [1:35:46] to close. [1:35:47] I just want to thank everybody for spending [1:35:50] your evening or a good portion of it with us [1:35:54] talking about electricity. [1:35:55] as I started off with york, my kind of crowd [1:35:59] that you want to spend your evening talking about [1:36:03] electric. [1:36:03] uh, when I go home, my wife doesn't have the same [1:36:08] level of interest that I get here. [1:36:10] so I really appreciate it. [1:36:12] uh, and thank you for contributing to our public [1:36:16] dialogue. [1:36:16] uh, we will be, uh, conveying this material, [1:36:19] uh, on our website. [1:36:21] we will also be accepting additional public comment [1:36:24] at our december 15th meeting and in writing. [1:36:27] so if you're no anyone that wants to contribute [1:36:31] that wasn't able to make it tonight. [1:36:34] uh, we have a couple more opportunities, but with [1:36:37] that really appreciate everybody coming out. [1:36:39] your thoughts are important, especially when [1:36:42] I acknowledge many of you that have been, uh, [1:36:45] consistently interested reading reports, uh, [1:36:47] showing up at board meetings, contributing to [1:36:50] the public dialogue for a very long period of time. [1:36:54] and you are heard. [1:36:56] so with that, thank you very much. [1:36:58] and I look forward to continuing our conversation.