[0:01] >> Good morning. It's 11:04 AM. [0:05] We are happily ready [0:07] to call the meeting [0:08] to order. I love the cheer [0:12] of the staff. Welcome to the [0:16] Planning and Program Committee [0:19] meeting of Los Angeles [0:21] Metropolitan Transportation [0:23] Authority. [0:24] >> Madam Clerk, will you please [0:26] call the roll [0:27] to establish a quorum? [0:30] >> Vice Chair Solis? [0:32] >> Present. [0:34] >> Director Horvath? [0:35] >> Here. [0:36] >> Director Mitchell? [0:37] >> Present. [0:38] >> Director Najarian? [0:40] >> Here. [0:41] >> Director Richardson will be [0:43] absent today. Caltrans [0:45] Representative Roberts? [0:47] >> Here. [0:48] >> And Chair Dupont-Walker? [0:50] >> Present. [0:52] >> Also, I just wanted to make [0:53] a note that we are very aware [0:54] that the screen behind the [0:56] directors is flickering. We [0:58] apologize for this. It's very [1:00] disruptive. Our IT team is [1:02] trying [1:04] to troubleshoot right now. [1:06] >> Deanna. [1:08] >> Thank you. Madam Deputy [1:09] Clerk, will you please provide [1:11] us with the public comment [1:12] instructions? [1:13] >> To give public comment, [1:14] each speaker needs [1:15] to follow a 3-step process. [1:16] First, at any time [1:18] during the meeting, the speaker [1:19] can dial 1-888- 978-8818 and [1:22] enter the English or Spanish [1:23] access codes. The English [1:26] access code is 5647249#. The [1:28] Spanish access code is [1:30] 7292892#. This number and the [1:33] access codes are also listed [1:34] on the agenda [1:35] for this meeting, [1:36] which can be found [1:37] at boardagendas.metro.net. For [1:39] speakers watching the video [1:41] feed, there's a 30-second lag [1:43] behind the actual meeting. If [1:44] any speakers are watching [1:45] on video and want [1:46] to give public comment, [1:47] they should dial in early to [1:48] make sure they don't miss the [1:50] chance. Second, once a speaker [1:51] dials [1:52] into the public comment line, [1:53] they have [1:54] to indicate which item, [1:55] item they want to speak on. [1:56] When their item comes up, [1:57] the speaker should press pound [1:58] 2 to raise their hand [1:59] to speak. Third, when it's the [2:01] speaker's turn, [2:02] the moderator will call [2:03] out the last 4 digits of the [2:04] phone number and unmute the [2:05] speaker. If the speaker is [2:06] listening to the meeting [2:07] on another device, [2:08] they will need to mute their [2:09] speakers and microphone [2:10] on that device [2:11] to prevent an echo. Speakers [2:13] will have 1 minute [2:14] to make their comment or 2 [2:15] minutes including translation. [2:16] Consistent [2:17] with the board rules posted [2:18] on the agenda, [2:19] individuals requesting [2:20] to speak will be allowed [2:21] to speak for a total of 3 [2:23] minutes per meeting [2:24] on agenda items in 1-minute [2:25] increments per item, plus 1 [2:26] minute [2:27] for general public comment. [2:28] General public comment is [2:29] to be used only for items not [2:30] on the agenda. Please be [2:32] advised that sign-up for public [2:33] comment will close immediately [2:35] once the public comment portion [2:36] of the item begins. If you wish [2:38] to speak, make sure [2:39] to register beforehand. [2:40] Written public comments [2:42] received by 5PM the day before [2:43] the meeting are compiled and [2:44] sent to the board. Please make [2:46] sure [2:47] to include the item number with [2:48] your comment and your position [2:49] of 4 against, general comment, [2:50] or item needs more [2:52] consideration. You may email [2:53] your comment to [2:54] boardclerk@metro.net or mail it [2:56] to Board Administration, 1 [2:57] Gateway Plaza, Mail Stop [2:59] 99-3-1, Los Angeles, [3:01] California 90012. Thank you, [3:02] Chair. [3:04] >> Thank you. [3:05] That's very important [3:06] because we want to assure that [3:07] the public can be full [3:08] participants [3:10] in the deliberation [3:11] of this committee. We want [3:12] to begin [3:13] with the consent agenda. Do any [3:15] members of this committee wish [3:17] to pull an item [3:18] from the consent agenda? [3:21] Okay, seeing no one wishes [3:22] to pull any item, do we [3:24] have members of the public [3:26] who have indicated a desire [3:27] to speak on items 6 and 7. [3:31] >> This public comment for [3:32] consent calendar items 6 and [3:33] 7. Please press pound 2 if [3:34] you'd like to make a comment [3:35] on any of these 2 items, 6 and [3:42] 7. No public comments. [3:45] >> Thank you. [3:46] Motion, is there a second? [3:47] >> Okay, it's been moved and [3:48] seconded [3:49] to approve the consent agenda. [3:51] We'll go ahead and vote [3:52] on this item. Please call the [3:53] roll. [3:54] >> Vice Chair Solis? [3:55] >> Aye. [3:56] >> Director Mitchell? [3:57] >> Aye. [3:58] >> Director Najarian? [3:59] >> Aye. [4:00] >> Director Horvath? [4:01] >> Aye. [4:02] >> And Chair Dupont-Walker? [4:03] >> Aye. [4:04] >> The consent items carry. [4:05] >> Thank you. Now moving [4:06] to the non-consent agenda, [4:08] we will start with item 8. [4:09] Federal Consolidated [4:11] Appropriations Act of 2026 [4:14] award. I believe we have a [4:16] presentation. Please introduce [4:19] yourselves and proceed. [4:22] >> Yes, we do. Good morning, [4:24] directors. Selena Reynolds, I'm [4:25] the Chief of Innovation and [4:26] Games Mobility Planning, joined [4:27] by Ernesto Chavez, Senior [4:28] Executive Officer [4:31] over the games work. And this [4:33] morning we are bringing [4:35] before you an item [4:36] for your consideration We were [4:38] extremely grateful [4:39] to receive an appropriation [4:42] in the fiscal '26 federal [4:44] budget for the Olympic and [4:45] Paralympic Games. And Ernesto [4:47] is going to walk through the [4:48] details and appreciate your [4:51] consideration. [4:54] >> Thank you, Selena. Good [4:55] morning, committee members. [4:58] The recommendations in front [4:59] of you include the programming [5:01] of $89.4 million coming [5:03] from the Consolidated [5:05] Appropriations Act of 2026. [5:07] In support of planning, design, [5:08] and operations for the 2028 [5:11] Games, amending the fiscal year [5:12] '27 budget [5:13] by the same amount, and then [5:15] authorizing the CEO or their [5:16] designee to negotiate and [5:17] execute all necessary [5:18] agreements, including [5:20] pass-through agreements and [5:21] amendments [5:22] with agencies contained [5:23] within the Games Mobility [5:25] Executive's federal funding [5:26] allocation, which is included [5:28] in Attachment A. The issue is [5:30] that Metro will be the lead [5:32] agency for this $89 million [5:35] coming [5:36] from the federal government. [5:38] And the proposed board actions [5:39] are necessary for us [5:40] to be able to initiate not only [5:42] the federal fund obligation [5:43] process, but also the funding [5:45] exchange process. This initial [5:48] appropriation in FY26 is, we [5:51] hope, an initial installment of [5:52] the full federal funding [5:55] request that we have made [5:56] over the past few years [5:58] for the games. The Games [6:00] Mobility executives, [6:01] we've been working with them [6:02] for many, many years, and [6:03] over the last few months agreed [6:05] to follow a similar [6:07] distribution model that we use [6:09] for the World Cup [6:10] for distributing federal funds [6:12] in which Metro would be the [6:13] sole recipient of the funds and [6:15] then help distribute the [6:16] funding [6:17] to the participating agencies. [6:19] Venue cities have expressed [6:20] interest in exchanging these [6:21] federal funds with local funds [6:23] for more flexible use and more [6:25] expedient use. And we're [6:27] essentially facilitating that [6:28] through this process. There [6:30] will be a local match [6:31] requirement [6:32] for the funds that was set [6:33] at 20% [6:34] for capital projects and 10% [6:35] for operation, [6:36] operational projects. In terms [6:38] of the scope of work for the, [6:41] for this initial allocation, [6:43] we've included in Attachment B [6:45] a larger description or a more [6:47] thorough description [6:48] of the work. But generally, [6:49] most of it involves the [6:51] preliminary design, [6:52] preliminary activities, [6:54] planning activities, [6:55] to various work streams. [6:57] In the case [6:58] of the venue cities and the [6:59] Games Mobility Executives, [7:01] they're going to be focusing [7:02] on the Games Route Network, [7:03] preliminary design for the [7:05] Games Route Network. For the [7:06] Integrated Transportation [7:07] Management, that's primarily [7:08] intelligent transportation [7:10] system projects. Metrolink is [7:11] going to be doing some of the [7:12] preliminary planning work as [7:14] well for their support [7:15] for the Games. And then [7:16] at the venue level, [7:18] venue cities will be working [7:19] on design for temporary [7:20] improvements that will enhance [7:23] connections [7:24] between venues and our [7:25] stations. On the Metro side, [7:27] we're going [7:28] to be using those dollars to [7:29] continue advancing planning and [7:31] also design for the Games [7:33] Enhanced Transit Service, the [7:34] GETS continue design and [7:36] getting into construction for [7:37] the key stations that we're [7:39] advancing and mobility hubs for [7:40] the games and also final design [7:42] for the light rail improvements [7:44] accessibility improvements that [7:46] we have designed [7:48] for the games as well. Next [7:49] steps. [7:51] With the approval today, or [7:52] with the board's approval next [7:53] week, we would advance the [7:55] Trans Grant application towards [7:57] the January 2027 deadline [7:58] for obligation, [7:59] federal obligation. And then we [8:02] would also initiate the process [8:05] of entering into agreements [8:06] with the local jurisdictions [8:08] for task order-based scopes and [8:11] cost reimbursement mechanisms. [8:13] >> And just one final note, [8:14] similar to the World Cup money, [8:16] this money flows through SCAG [8:17] to Metro, and SCAG's Regional [8:20] Council approved this process, [8:22] and we just want to offer our [8:25] appreciation and gratitude [8:27] for their partnership. [8:29] >> Thank you. Madam Clerk, are [8:31] there any members [8:32] of the public who wish [8:33] to speak on this item? [8:35] >> This is public comment [8:36] for item 8. Please press pound [8:37] 2 if you'd like [8:38] to make a comment [8:39] on this item. No public [8:43] comments. [8:44] >> Thank you. I, I join, I'm [8:47] sure, the entire board [8:48] in commending Metro staff and [8:50] our Games Mobility Executive [8:51] Partners [8:52] for successfully securing $90 [8:54] million through the Federal [8:56] Consolidated Appropriations [8:57] Act of 2026. As you indicated, [9:00] it's important [9:02] down payment preparing [9:04] for our transportation network [9:06] for 2028 Olympics and [9:07] Paralympics Games. and reflects [9:09] the strong collaboration among [9:11] our regional partners. A few [9:13] questions, and you may have [9:14] answered one of them. Could you [9:17] share the anticipated timeline [9:19] and process [9:20] for local jurisdictions [9:21] to draw down on the program? [9:22] You indicated SCAG, [9:24] but if there's any more detail. [9:25] And secondly, [9:27] what are the major milestones [9:28] for disbursing the funds? [9:33] >> Thank you. The first [9:35] milestone entails coming [9:37] to an agreement [9:38] with the local jurisdictions [9:40] on the scope, the schedule, [9:41] and the budget [9:42] for the projects. We'll be [9:43] working with them [9:44] over the next couple of months [9:45] to complete that. That will [9:47] lead us to, the requirement [9:49] to complete an agreement, [9:52] either an MOU or a funding [9:54] agreement with them. And then [9:57] once we establish that [9:58] agreement and the work [10:00] commences, they can start [10:02] essentially invoicing [10:04] on a reimbursement basis. So, [10:05] we anticipate completing that [10:07] process over the next 3 months. [10:09] So, by around November or so, [10:12] we should have the agreements [10:13] ready and they can begin [10:15] invoicing us. [10:17] >> Just to add another couple [10:18] of points to that. First, local [10:20] agencies will need to come up [10:21] with the local match [10:22] to match the funds. And the [10:25] work is coming up through all [10:29] of the work streams. And we've [10:30] been coming [10:31] before you and reporting out [10:32] on that work stream progress. [10:33] So, these are projects and [10:34] planning that is sort [10:36] of already underway, [10:37] and it's meant to bring those [10:39] into the implementation phase. [10:41] >> Thank you. [10:42] I see several board members [10:43] who have questions. [10:44] Supervisor Solis? [10:46] >> Yes, thank you, Madam [10:47] Chair. First of all, I want [10:49] to say thank you to the team, [10:50] and I think all [10:51] of us are really excited [10:52] about what just took place [10:56] with the FIFA festivities in [10:58] the fan zone and seeing the [11:00] excitement and people coming [11:01] and utilizing Metro services as [11:03] well as bus, rail, [11:05] and everything else [11:06] in between. And I know that [11:08] moving forward that our ask was [11:11] actually a lot higher than what [11:12] we received, right? So, our ask [11:14] was about $2 billion, [11:16] is that correct? [11:17] >> So, we are woefully behind, [11:19] but I hope that we can compile [11:21] the data information [11:22] to show that even [11:25] in our precursor here with FIFA [11:26] that we actually did a good [11:28] job. And people brought in [11:30] resources and did local match. [11:32] And I want to just describe [11:33] for you what we went through [11:36] at the Whittier Narrows. I want [11:38] to first thank Caltrans and our [11:40] public works [11:42] for helping us with, actually, [11:44] with the open streets. [11:46] Repaving Rosemead Boulevard was [11:48] a major undertaking. Had not [11:50] been done in decades. And that [11:52] will help us prepare [11:54] for the upcoming LA-28 SCEETs. [11:56] Games that are going [11:58] to be held right there. So, it [11:59] helps to provide, I think, [12:01] that level of awareness and [12:03] hopefully gives a signal [12:04] to the feds that, hey, we are, [12:06] we are here, [12:07] we are participating. And we [12:08] also set aside $1 million [12:10] of our own LA County funds, [12:13] road improvement funds that [12:14] come through my office, [12:16] to dedicate for this effort. [12:18] So, it shows you that there's [12:19] participation, collaboration [12:21] in that way. But we can We can [12:22] think creatively, and I think [12:25] that's what the FIFA Games kind [12:26] of gave us, an opportunity [12:28] to think out of the box, [12:30] where we're reliant, yes, [12:32] on outside support, but we can [12:34] also look innovatively. [12:36] But we do need monetary support [12:38] to continue to sustain that. [12:40] And I just want to say that [12:41] for the first time, [12:43] we had close to 10,000 people [12:44] show up at this park, [12:46] obscure park that is hidden [12:48] behind trees next [12:49] to a freeway. And for people [12:50] to come out 3 days, [12:51] and it kept growing, growing, [12:53] growing. And I would just say [12:54] that one [12:55] of the most positive parts [12:57] about it was that we acquired [12:59] our own shuttle services. [13:00] Coming not exactly directly [13:03] from rail, but yes, [13:04] I would say for the El Monte [13:06] Metro Hub, yes, [13:08] there was an easy way [13:09] to get there. [13:10] But other than that, [13:11] Montebello Mall, Steinmetz [13:13] Park, which is in Hacienda [13:14] Heights, Avocado Heights, they [13:16] don't have any rail system [13:18] running through there or even [13:19] Metrolink. So people did board [13:21] those and they used them. And [13:24] there was sufficient, [13:28] how could I say, roadway [13:29] passage safety pedestrian [13:30] measures put in place. And I [13:32] had never seen, this was [13:34] something we just thought [13:36] about, but to see it in reality [13:37] and how it was utilized [13:39] by young, old, people [13:41] with disabilities, really gave [13:43] me that hope that even in areas [13:46] that are unincorporated and are [13:48] hard to get to, [13:49] that we know how to do this and [13:51] we can improve upon it. And I [13:53] certainly want [13:54] to see us moving forward [13:55] to collaborate and do much more [13:56] in any way that we can. So, I [13:58] am totally supportive of moving [14:00] forward and hopeful that we can [14:02] hopefully get to that $2 [14:03] billion and show that we are [14:05] cooperating in a way that has [14:08] never been seen before. And I [14:10] believe our public, [14:11] once we get the feedback of how [14:13] many people actually joined our [14:14] shuttles or used our other [14:17] services, what that looks like [14:19] for us, even in faraway places [14:20] like San Gabriel Valley. So, I [14:23] just want to say thank you. [14:24] And I want to thank our CEO and [14:25] the staff because believe me, [14:27] Metro had a big presence there. [14:29] And I am very grateful for that [14:30] and honored that we were able [14:31] to pull that off. Thank you. [14:37] >> Thank you. [14:39] >> Director Najarian. [14:41] >> Thank you. Thank you, [14:43] Madam Chair. So, we're looking [14:45] for $2 billion. That's our [14:46] target. [14:48] >> And now I present [14:50] to you a check for $2 billion. [14:54] >> So, was that Ed McMahon? [14:57] >> So, this is the first [14:59] tranche that we're receiving. [15:01] This 90-some million [15:03] at this point? [15:04] >> The number is now down at [15:06] $1.85 with this as well as some [15:08] other grants that we've [15:10] received, but yes, [15:11] you are correct. [15:12] >> Okay. [15:13] >> So, I agree with Director [15:14] Solis that our actions really [15:19] speak loudly when they can look [15:22] back and see how we handled the [15:23] World Cup transportation, [15:26] safety, everything that we did, [15:29] and there was a lot going on. I [15:32] really think that we should [15:34] send a heartfelt thank you note [15:38] to the federal government, [15:39] whoever it is, to let them know [15:42] that we deeply appreciate this [15:45] albeit small piece of what [15:49] we're looking for. I think. I [15:51] mean, [15:56] we know there's certain issues [15:59] at the federal level. It's not [16:01] always, [16:02] funding isn't always made based [16:04] on merit and quality [16:06] of projects and history [16:08] of doing it. But I think a nice [16:10] thank you note to let them know [16:13] that we appreciate this. Maybe [16:16] we hope that this is the [16:17] beginning of a beautiful [16:18] relationship going towards the [16:21] Olympics in 28, just so they [16:23] know that okay, [16:25] we appreciate it. And I think [16:28] that might go farther than just [16:32] the strict look what we've done [16:34] and we use our money [16:35] efficiently and we're you know [16:37] doing that. Just thank you. We [16:39] hope that we can continue [16:40] working together to make our [16:42] country proud. [16:43] I don't know. [16:44] Something, something a [16:45] little bit gushy. [16:47] Like this. [16:48] Yeah. [16:49] The heart. [16:50] That's just my thoughts. So [16:51] that's all I would like [16:53] to chime in on [16:55] at this point. [16:56] >> Noted. Thank you, [16:57] Director. [16:58] >> Director Horvath. [16:59] >> Thank you, Madam Chair. I [17:01] too want to thank our Metro [17:03] team for your stellar outreach [17:05] and work to achieve where we [17:06] are today. I do want [17:08] to thank our federal government [17:09] for making this initial [17:10] investment. And I also want to [17:14] understand if we believe there [17:17] is opportunity [17:18] for the remainder [17:19] of our request to come [17:20] to fulfillment? And if it [17:21] doesn't, [17:22] do we have contingency plans [17:23] to address what needs will [17:24] exist on the ground? [17:27] >> We still remain optimistic [17:30] that in working with, [17:32] in partnership with our, [17:33] with the organizing committee, [17:35] with LA28, [17:37] that there is still a window [17:39] for us to achieve the full [17:41] funding that we need [17:43] to execute what we need [17:44] to execute. When you say [17:46] contingency plans, can you, [17:48] to address the needs [17:49] on the ground, can you address, [17:51] can you say a little more about [17:52] what specifically you mean? [17:55] >> Well, if we, [17:56] I assume we requested the [17:57] $1.85 billion now because there [18:00] are specific things that are [18:02] not [18:03] in our budget that we cannot do [18:04] without funding. So if we don't [18:06] get funding [18:07] from the federal government, [18:09] I see that you have been able [18:11] to get down from $2 billion [18:13] to $1.85 through some [18:14] additional grant funding, [18:15] so that's great. Are there [18:17] other opportunities like that [18:18] or something else that exists, [18:20] or are we going to have to say [18:22] there are just certain things [18:23] that despite our best planning [18:25] we won't be able to do? [18:26] >> Understood. [18:27] So, when it comes [18:30] to the projects that we need [18:31] to finish construction on that [18:33] this board has funded and that [18:35] we've received funding from [18:36] elsewhere we do feel as though [18:39] there are opportunities for us [18:40] to finish those projects or [18:42] come up with contingency plans [18:45] to meet those needs. However, [18:47] the 2 largest items in that [18:49] $1.85 billion are $1 billion [18:51] for the supplemental transit [18:53] service that we will need. So [18:55] similar to what we executed [18:56] for the World Cup [18:58] with the extra buses, working [19:00] with our municipal partners [19:01] and, and our friends [19:03] in the charter industry, [19:04] we will need 1,700 roughly [19:06] additional buses and the costs [19:09] that go along with them, [19:10] as well as the games route [19:11] network, [19:12] which is a significant cost. [19:14] It's about $333 million. [19:15] That's where it sits right now, [19:17] largely on the Caltrans system, [19:19] on the state highways, [19:21] but also about $80 million or [19:23] so of that is [19:24] for venue cities. So local [19:26] agencies, the rest [19:28] of the way there between the [19:29] freeway and the venues [19:31] for hopefully our buses [19:33] for spectators and workforce, [19:34] but really for the athletes and [19:36] the officials and the media. [19:38] Those 2 items are almost [19:40] impossible to fund any other [19:42] way because they are purely [19:45] operational [19:46] in nature and temporary. And [19:48] so, what we have with our MOU [19:50] with the organizing committee [19:51] is very clear that if there is [19:53] not outside funding, Metro will [19:55] not be able to serve in that [19:57] capacity as delivery partner, [19:58] and the organizing committee [20:01] will need to figure [20:02] out alternate plans. [20:04] >> Okay, that's, I'm glad we're [20:06] managing those expectations [20:08] early, especially if we don't [20:09] get that funding. So, also, [20:14] I know that for the new [20:16] crossover and siding track [20:17] project on the A and E lines [20:20] what is the timeline [20:21] for that project? And will [20:23] there be any disruption [20:24] to service [20:25] during construction? [20:30] >> The timeframe [20:32] for finishing design and Tim is [20:34] here. [20:37] >> I heard the seat. [20:40] >> Just go ahead and keep [20:41] going, Ernesto. So that portion [20:48] of the project is yet [20:49] to be completely funded, [20:52] right? And that requires a lot [20:53] of special track work that [20:54] needs to be ordered. And we are [20:56] right up against the clock [20:57] on those projects. So, we do [20:59] have a procurement that's [21:00] ongoing right now. We're hoping [21:01] to bring it forward in [21:02] September to put us [21:03] in the best position [21:04] to be able [21:05] to construct those projects. [21:06] So, all hope is not lost. [21:07] We're trying. [21:10] But what I would say about [21:11] those is that they are projects [21:14] we need to do anyways, [21:15] Olympics or not. They are very [21:17] useful to operations. The [21:19] downside with those projects is [21:21] that they're very high impact [21:23] in terms of impact [21:24] to customers. You can't put new [21:25] interlockings in without bus [21:27] bridges and shutdowns. And so [21:29] that's kind of part [21:30] of the mix we need [21:31] to figure out. But we're still [21:32] giving it a shot. We're still [21:34] trying to fund them. We're [21:35] going to put ourselves [21:36] in the best position, but, yes, [21:37] they are difficult projects to [21:39] achieve while also providing [21:41] service. [21:42] >> And for the Olympic and [21:44] Paralympic venue approach [21:45] enhancements, some of the [21:47] improvements are indicated as [21:48] temporary, including the [21:50] intersections and bike lanes. [21:52] Where are the temporary bike [21:54] lanes and why are they not [21:55] permanent? [21:58] >> So just one addendum to [22:00] Tim's note. Those projects, [22:03] those track projects are also [22:06] in the TIFIA letter that we [22:07] brought before you. So, we are [22:09] pursuing alternate ways to fund [22:11] those because we do need them [22:12] either way. Regarding the venue [22:13] approach, [22:15] so these venue approach [22:17] improvements, which is the [22:18] category that includes crowd [22:21] management, heat mitigation [22:23] measures, wayfinding, [22:25] all kinds of things, they also [22:27] may include some temporary or [22:29] permanent infrastructure [22:32] for people biking and walking. [22:34] Those decisions are really the [22:35] decisions [22:37] of the venue cities themselves. [22:38] So, through that first last [22:39] mile work stream, [22:40] we have been bringing together, [22:41] that work stream is led [22:43] by the City of Los Angeles, [22:45] by LADOT. They've been bringing [22:47] together those venue cities and [22:51] working through all [22:52] of those scopes [22:53] for those projects. And so, [22:54] it's really kind [22:55] of a local decision. We can [22:57] certainly get the latest [22:59] for you on the details of [23:00] what's going where and when and [23:02] how, or at least what they're [23:03] envisioning at the moment. [23:05] But that's kind [23:06] of the high level. [23:07] >> Yeah, I can imagine these [23:08] investments being legacy [23:09] investments in the community, [23:10] especially if they, [23:11] we expect them [23:12] to be highly used facilities, [23:15] that it might be nice [23:16] to keep them longer term. But I [23:18] hear you that that's not a [23:19] Metro call. So, thank you. [23:24] >> Supervisor Mitchell. [23:27] >> Thank you very much, Madam [23:28] Chair. I want [23:29] to just echo the comments [23:30] from all of my colleagues. [23:32] Congratulations on the, I'll [23:34] just keep emphasizing first [23:36] installment because that would [23:38] suggest an additional [23:40] installment is forthcoming. [23:43] Agree with you, Director [23:45] Najarian. Let's thank them. [23:48] And I was wondering if there [23:50] are ways from your perspective [23:52] that the board could be [23:54] supportive of Metro's advocacy [23:57] for a second 3rd, 4th, [24:00] 10th installment. And I, [24:02] and I asked because, as [24:04] Director Horvath talked [24:06] about if not this, then what? [24:10] And you talked about what the [24:12] $1 billion from the, for the [24:14] supplemental transit plans are [24:17] needed. It reminds me that we [24:19] have a fundamental [24:20] responsibility to make sure [24:21] that we're maintaining frequent [24:23] and reliable service for [24:27] Angelenos who rely on Metro [24:33] for their transit needs. So, is [24:35] there anything from your [24:37] perspective the board could do [24:38] to be helpful? [24:44] >> One is in Washington and [24:46] Sacramento. In Washington, the [24:48] issue right now is What exactly [24:51] is the appropriations process [24:53] that's remaining? The key step [24:55] in that process is that we need [24:56] the administration [24:57] to communicate to Congress the [25:00] need to include this money in [25:02] whatever appropriations bills [25:04] move. You've probably heard the [25:06] discussion about a supplemental [25:08] funding primarily oriented [25:09] towards war funding. There may [25:11] or may not be something enacted [25:13] before the election. We've [25:15] heard most likely something [25:16] would be enacted [25:17] after the election, but [25:19] in either way, [25:20] in either case, [25:21] we need communication [25:22] from the White House to [25:23] Congress that this needs [25:25] to be a priority. And we're [25:26] working very closely with LA28 [25:28] to secure that. A lot [25:30] of these roads lead [25:32] through OMB, so working [25:33] through OMB is important. We [25:35] had a very good visit [25:36] with the Secretary when he came [25:39] out to the ESOC, and I think he [25:42] understood the importance [25:43] of the success of the World [25:44] Cup to the Olympics. So we're [25:46] continuing to work [25:47] through the Department of [25:48] Transportation, but really [25:50] It's between the White House [25:51] and Congress with respect [25:53] to the $1.8 billion. In [25:55] Sacramento, we're also working [25:58] on a $379 million ask. [26:00] In fact, Madeline and Alex are [26:02] on phone calls all day today [26:04] talking to members [26:05] about that specific ask. We, we [26:07] pulled things out of our [26:09] federal program and oriented a [26:11] state ask towards the kind of [26:12] things we thought the state [26:13] would be most likely to fund. [26:15] So, we really need the LA [26:18] delegation to unify around that [26:20] and secure that when the [26:22] legislature comes back [26:23] from recess. So, I'd really [26:25] direct your focus towards [26:26] Sacramento in this case. [26:28] >> And so, this is an ask [26:31] for current budget year, [26:32] budget year plus 1? [26:33] >> Current budget year. [26:35] Current budget year. Because [26:36] what, [26:38] there was a budget that was [26:40] adopted, but we have heard [26:42] there will be, well, There's [26:43] more than one budget in [26:44] California these days. You [26:46] usually get the budget and then [26:47] subsequent budgets. [26:48] >> Additional trailer bills. [26:49] >> Trailer bills, right. So, we [26:52] would be looking [26:53] in the month remaining [26:54] in session [26:55] to try and secure something [26:56] of the 379. [26:58] >> Okay, so that's where you'd [26:59] like us [27:00] to focus our energy. [27:01] >> That's. [27:04] All right, okay, thank you. [27:06] I'm glad I asked that question [27:07] because I had no idea [27:08] about that piece. [27:09] Thank you. [27:10] Director Solis, I couldn't [27:12] agree with you more. I wrote [27:13] down your quote. We know how [27:15] to do this. And I was not [27:16] convinced [27:17] before that we knew how [27:18] to do it. Maybe I'll speak for [27:19] myself. I wasn't convinced I [27:20] knew how to do it. [27:22] But let me say, [27:24] I couldn't agree [27:25] with you more. The countywide [27:27] nature of the official FIFA and [27:31] the official Metro programs was [27:35] just breathtaking. And I can't [27:38] imagine what our region needed [27:41] more than that success right [27:43] now. It was phenomenal. I mean, [27:47] it was just phenomenal. I can't [27:48] speak more highly [27:49] of it. I want to thank Metro. [27:51] We too had shuttles running [27:52] from Rosa Parks. I told CEO [27:55] Wiggins that I was amused [27:56] by the Angelenos who came up [27:58] to me [27:59] with utter surprise. I took [28:00] Metro when I got here. Like, [28:02] right, [28:03] people do that every day. Go [28:05] Metro. So, I hope that we earn [28:07] some raving Metro fans, [28:10] in addition to you know, [28:13] World Cup fans. I completely [28:16] agree. And from the, from, and [28:20] from the county's perspective, [28:22] from the JCOD bus on site, [28:24] that partnership with Metro and [28:27] Metro's presence at Magic [28:29] Johnson Park, I couldn't agree [28:31] with you more. I'm very proud [28:33] that that we had that shared [28:34] experience. And it really [28:35] absolutely is a perfect, it was [28:39] a perfect training ground. We [28:40] do know how to do this. And I [28:43] think, I hope that will instill [28:45] a higher level of confidence [28:47] in all of us, speak [28:48] for myself again, as well as [28:49] the federal government and the [28:51] state government, that with [28:52] investment it will be a [28:55] seamless system [28:57] with the investment. Because [28:59] we've got to maintain access [29:00] for our Metro riders as well as [29:03] guarantee the athletes and the [29:05] Olympians that they too can [29:06] rely on us for transport. So, [29:08] thank you [29:09] for the homework assignments [29:10] in terms of what we can do [29:12] to try to put our shoulder [29:13] to the grindstone to help [29:15] Metro staff in accessing these [29:17] additional resources. Thanks, [29:18] Madam Chair. [29:21] >> Thank you. And Supervisor [29:22] Mitchell, you're exactly right. [29:23] I'm keeping a list [29:24] of first-timers on Metro. My [29:26] friends are calling, and the [29:28] commemorative cards that they [29:29] were going to file away, [29:30] they're now using. [29:32] But thank you, CEO Wiggins, for [29:34] your regular updates and your [29:36] postings, which we were able to [29:39] share and encourage some people [29:40] just to go where they thought [29:42] it was just too crowded. This [29:44] certainly was a wonderful, [29:45] wonderful trial run. [29:48] Trial run. [29:49] This is an action item. [29:50] Could I have a motion and [29:51] second, please? [29:54] >> Okay, this is something we [29:55] all want to vote on, so Madam [29:56] Clerk, will you please try, [29:58] >> Vice Chair Solis? [29:59] >> Aye. [30:01] >> Director Mitchell? [30:02] >> Aye. [30:03] >> Director Najarian? [30:04] >> Aye. [30:05] >> Director Horvath? [30:06] >> Aye. [30:07] >> And Chair Dupont-Walker? [30:08] >> A unanimous aye. [30:09] >> The motion carries. [30:10] >> Thank you. I thank you [30:11] for the presentation. We are [30:12] now ready for item 9, [30:15] Antelope Valley Line [30:16] Improvements, San Fernando [30:17] Valley and Pacoima Metrolink [30:19] Stations and Mobility Hub. [30:22] Mr. Sosa, do we have a [30:24] presentation? [30:26] >> Good morning, Chair, [30:28] committee members. Ray Sosa, [30:29] Metro Chief Planning Officer. [30:31] As folks get settled in, [30:32] I did also want to thank all [30:34] of the staff in the Planning [30:35] Department and other supporting [30:38] departments, [30:40] not only bringing the number [30:41] of items today to the Planning [30:42] and Programming Committee, [30:43] but also being the MVPs out [30:46] in the field supporting [30:48] on FIFA World Cup MVPs, work [30:50] streams, fan zones, transit [30:53] fans, first fans, still doing [30:54] all that while being able [30:56] to bring these items [30:57] to the board this July. So, I [30:58] wanted [30:59] to extend that thank you, [31:00] especially since many [31:02] of them are [31:03] in the building as opposed [31:04] to being out [31:05] in the field. I'm not used to, [31:06] to that sort of effort. So [31:07] really want to say thank you [31:09] to all of them. This item [31:10] before you is the Antelope [31:13] Valley Line Improvements, San [31:14] Fernando Valley Pacoima [31:16] Metrolink Station and [31:17] Mobility Hub. I'm joined by [31:19] Michael O'Connor, Executive [31:20] Officer, and Karen Swift, [31:22] Deputy Executive Officer. [31:23] Michael O'Connor will go [31:24] through the presentation. [31:25] >> Thank you, and thank you, [31:26] Madam Chair. I appreciate it. [31:27] It's a little bit drafty [31:29] in the boardroom, so I had [31:30] to bring out my Argentina scarf [31:31] just to keep me warm. Down, [31:34] down to business. [31:37] >> We are all English. [31:38] >> You told me you wouldn't [31:39] wear it. [31:40] >> Yeah, yeah. You're supposed [31:41] to give it to me, right? [31:43] >> Well, it's a pleasure [31:44] to be here. This item is a [31:45] continuation of prior board [31:48] actions that were taken [31:49] December of 2025 and April [31:51] 2026, focused on creating a [31:53] broader multimodal [31:55] transportation vision [31:56] for connecting the City of [31:57] San Fernando and the [31:58] Northeast San Fernando Valley [32:00] communities to the rest of the [32:01] regional transportation system. [32:02] This item here is focused [32:03] on the Pacoima Metrolink [32:04] station and mobility hub. [32:06] Today we're asking [32:07] for this item to program $6.9 [32:09] million that will help us do [32:10] the conceptual planning, [32:12] environmental clearance, [32:14] preliminary engineering, [32:15] and the community outreach [32:16] for the San Fernando Valley [32:18] Pacoima Metrolink station and [32:19] mobility hub. And I just want [32:21] to note before we start that [32:22] this effort really is a [32:23] multimodal team effort across [32:24] Metro, but also our partners [32:26] at different agencies, and [32:27] tremendous outreach that we [32:29] have done [32:30] with the communities, [32:31] listening to them and trying to [32:32] incorporate their concerns and [32:33] items within our approach to [32:35] designing and planning [32:37] different improvements [32:38] in this area to make a seamless [32:39] integrated approach [32:40] to transportation in this part [32:42] of the area that really [32:43] deserves high-quality [32:44] transportation options. So, [32:47] part [32:48] of that vision here is really [32:49] to leverage the Metro-owned [32:51] Metrolink Antelope Valley Line [32:53] right-of-way and the [32:54] Metro-funded Metrolink [32:55] Antelope Valley Line service [32:57] that does run through the [32:58] corridor you see there [33:00] from the north, the northwest [33:02] to the southeast. The I want [33:04] to orient you [33:05] to the gold star there, number [33:06] 5. That is the proposed [33:08] location for the Pacoima [33:09] Metrolink station, [33:11] which would basically be [33:13] at the terminus of the East [33:14] San Fernando Valley light rail [33:16] project that we are moving [33:18] forward currently. This will [33:20] provide an opportunity [33:21] to connect 2 systems at a very [33:23] key convenient transfer point [33:27] that will connect this area to [33:29] opportunities north and south. [33:30] east and west across the [33:33] Allen Valley Line into Santa [33:34] Clarita, San Fernando Valley, [33:36] down to Los Angeles. Focus you [33:37] on Burbank Airport North, [33:39] for example. The terminal is [33:41] being moved to the northern [33:42] area where we have a Metrolink [33:44] station on the north side of [33:45] Burbank Airport, and as well as [33:46] the future opportunities the [33:48] East San Fernando Valley [33:50] Light Rail project will offer [33:52] connecting everyone further [33:53] south and eventually even [33:54] to the future Sepulveda [33:56] Transit Corridor project. So, [33:57] there's a lot [33:58] of opportunity here, [33:59] and this is why we're bringing [34:00] in a lot [34:01] of different teams and agencies [34:02] to help us put together a [34:03] vision on how we can put forth [34:04] the most integrated system [34:06] possible to create value [34:07] for the Pacoima Station as a [34:09] key link for a transfer [34:11] between our 2 systems. [34:15] Previously, the prior board [34:16] actions that I did mention were [34:17] revolving around the East San [34:18] Fernando Valley Shared [34:20] Right-of-Way Study. And [34:21] at the end of that study, the [34:23] board did take a preferred [34:25] alternative that they approved [34:26] to adopt the new Pacoima [34:28] Metrolink Station and [34:30] to move it forward through [34:31] design and environmental [34:32] clearance. And we're, [34:33] this is part [34:34] of a larger effort, [34:35] of course, in terms of at-grade [34:36] crossing improvements that we [34:37] heard earlier in April this [34:39] year and other key items you're [34:41] going to hear about later on [34:42] in this presentation. [34:43] But ultimately, one of the key [34:44] features here is the multimodal [34:45] mobility hub that we're going [34:46] to be bringing to this. It's [34:48] not just a transfer station [34:49] platform to platform. We're [34:51] looking at integrating [34:52] different multiple rail [34:54] systems, of course, [34:55] but also bus systems, Metro [34:56] operations, [34:57] we have municipal operations [34:59] in the area, and we also want [35:00] to bring [35:01] in active transportation [35:02] options in an area that [35:03] desperately needs more [35:04] opportunities [35:05] to access transportation by [35:06] walking or bicycle or other [35:07] kinds [35:08] of safe and convenient methods. [35:10] As mentioned previously, [35:11] ultimately there's a future [35:14] where this line for the [35:15] Antelope Valley Line is going [35:17] to become intercity rail [35:18] potentially and could extend [35:19] down to San Diego in terms [35:20] of access. So, we're really [35:21] trying to bring as much value [35:23] as we can. to this part of LA [35:24] County. The local residents [35:27] will benefit tremendously [35:28] from this investment, [35:30] and this initial phase [35:31] of work is specifically for the [35:33] station and the work we need [35:34] to do there, [35:35] as mentioned previously. The [35:36] mobility hub I want [35:37] to bring up as a, as a key, [35:40] as big as a key feature. This [35:42] really is an opportunity [35:43] for us to put together all the [35:44] best practices and the [35:45] different things we've been [35:46] working on into one location [35:48] for this area, [35:49] even featuring some [35:51] of the things we talked about [35:52] for the World Cup [35:53] with heat mitigation, [35:55] for example, thinking about [35:56] ways that we move people back [35:57] and forth so that it's [35:59] people-focused and it's safe [36:00] and convenient. And it really [36:02] spurs a reliance [36:05] on public transportation [36:06] in this area [36:07] to provide greater value, [36:09] not just for the residents, [36:10] but for local businesses and [36:12] just general commuting. So, [36:14] we're very excited [36:15] about this. The mobility hub is [36:16] something that we're going to [36:17] be developing and moving [36:18] forward, and obviously [36:19] in concert with community [36:20] engagement. and conversations [36:21] about how does this space [36:22] potentially provide the best [36:24] value [36:25] for the local residents. And [36:27] I'd like to turn it over to [36:28] Karen Swift, who will talk [36:29] about the community engagement [36:31] piece. [36:32] >> Thank you, Michael. Karen [36:33] Swift, Deputy Executive [36:34] Officer in Community [36:36] Relations. So following board [36:37] action this month, our [36:38] department will issue a [36:40] communications bench task order [36:41] to engage Northeast San [36:43] Fernando Valley communities [36:44] on the latest developments in [36:45] all these planning efforts that [36:46] Michael's described. Our [36:48] outreach efforts will build [36:49] upon the robust engagement [36:51] conducted for the shared [36:52] right-of-way study back in [36:53] 2025. This committee may recall [36:55] that we had not just the [36:57] traditional briefings and [36:58] community meetings, [36:59] but we had Spanish language [37:01] roundtables partnered [37:02] with our CBOs in the North [37:04] Valley. We also hosted our own [37:05] resource fair in partnership [37:06] with the City of San [37:08] Fernando, where we distributed [37:09] more than 150 boxes [37:11] of fresh produce. [37:12] to groups up there, [37:14] which was just great. So, you [37:15] see some pictures [37:16] of that here. So going forward, [37:18] we want to build [37:19] from that model. And so, [37:20] we'll have design charrettes, [37:21] roundtables again, working [37:23] with CBOs, hands-on workshops. [37:25] I picture us building little [37:27] mobility hubs and sort [37:28] of playing around [37:30] with some 3D elements. We'll [37:31] have strategic partnerships [37:32] with elected officials, local [37:34] jurisdictions, CBOs, and [37:35] of course youth. We've got [37:37] Mission College up there and [37:38] some other connectivity we want [37:39] to make sure we tap into. And [37:41] then following that, countywide [37:42] planning will execute a task [37:44] order to start the conceptual [37:45] planning, environmental [37:46] clearance, [37:47] and preliminary engineering. [37:49] That concludes our [37:50] presentation. [37:52] >> So next steps here before we [37:53] conclude actually is the, [37:54] we have a task order we're [37:55] going to be issuing this summer [37:56] that will move this forward [37:57] with board support this month. [37:58] So with that, we're happy [38:00] to take any questions. [38:02] >> Thank you. Thank you [38:04] for the presentation and for [38:05] the excitement that we continue [38:07] to feel. As usual, [38:10] we normally hear [38:11] from the public before the [38:12] board members deliberate. or [38:13] ask questions. [38:15] But today I want to be sure, [38:17] because of uniqueness [38:18] on this item, [38:19] that our board clerk is [38:21] prepared [38:22] to make the necessary changes. [38:29] Oh, okay, absolutely. [38:33] Thank you. [38:35] Okay I'm moving ahead too [38:36] quickly. Do any board members [38:38] have questions or comments? [38:45] Okay, this is Director [38:47] Horvath. [38:49] >> Thank you, Madam Chair. [38:50] This is an exciting step [38:52] following the approval [38:53] of the next steps for the [38:54] shared right-of-way study in [38:56] December of last year. So, I [38:58] really want to thank staff [38:59] for all of your work on this [39:01] project. I know it's highly [39:03] anticipated in the Northeast [39:04] San Fernando Valley, which [39:08] certainly has been eager [39:09] to see more investment [39:10] in transportation solutions. [39:12] So, I know this is going, [39:14] going to, [39:15] and certainly means a lot [39:16] already, and we want to make [39:17] sure we're getting it right. I [39:20] know our board approved [39:22] Scenario 2 in December [39:23] of last year, [39:25] as well as direction [39:26] to move forward [39:27] with environmental clearance, [39:28] safety improvements at the, at [39:31] the 6th at-grade railroad [39:33] crossings within the project [39:35] area and the identification [39:38] of funding. This segment [39:39] of the project began moving [39:41] on a track separate [39:43] from the 6.7-mile Van Nuys [39:46] running segment. So, I just [39:48] want to make sure we're clear [39:49] about timeline and we manage [39:52] expectations so community [39:54] members know exactly what's [39:55] coming and they can stay [39:57] engaged appropriately. As well [39:59] as for budgetary purposes, [40:01] I know this action looks [40:03] to approve just $6.9 million [40:04] for planning work, but the [40:06] project is still estimated [40:07] to cost more than $250 million. [40:10] So, is it the intent of staff [40:12] to deliver the shared [40:13] right-of-way segment along [40:15] with the Van Nuys running [40:17] segment? [40:19] >> So, we're obviously aware [40:21] that it'd be very important to [40:22] provide that connectivity as [40:23] soon as possible for the value [40:24] for both systems. We have a lot [40:26] of work ahead of us to be able [40:28] to put forth the timing because [40:29] a lot of it may just depend [40:31] on phasing of the project or [40:33] the design scope [40:34] for the station itself, [40:35] or what we can do potentially [40:36] in different steps. So we'll [40:38] have more information [40:39] on that timing when we come [40:41] back to the board [40:42] with the next report. [40:43] But our intention is to try [40:44] to maximize that value of, [40:46] of connectivity when the East [40:48] San Fernando Valley Light Rail [40:50] opens, if possible. [40:51] >> So, if you continue to, [40:52] to diverge, do you have an [40:53] estimated timeline [40:54] for construction and delivery [40:56] And should we expect to see [40:58] sizable budget allocations [41:00] for the project in the [41:01] near future, given where, [41:03] what's being allocated today [41:04] versus what the total project [41:05] cost will be? [41:08] >> Well, the conceptual [41:09] planning and the preliminary [41:10] engineering phase is going [41:11] to be about 20 months. That [41:13] will tell us a lot [41:14] about what we're dealing with, [41:15] of course, in terms [41:16] of the scope, [41:17] potential future costs. And we [41:19] would come back to the board, [41:20] of course, to certify the [41:21] environmental documentation and [41:22] the program funds [41:23] for the design. So right now, [41:24] we don't have a lot [41:25] of information [41:26] about the exact steps forward [41:28] for those pieces. We want to [41:29] make sure that we have that [41:31] information when we come back. [41:33] But we'll know more about the [41:34] overall construction schedule [41:35] and the overall project budget [41:36] as we proceed [41:37] through these different steps [41:38] for planning and preliminary [41:39] engineering, et cetera. Plus, [41:41] we have more community [41:42] engagement we have to do to [41:43] make sure that we're getting [41:44] the scope correct [41:45] in that area. So, we'll [41:46] establish a funding plan, [41:48] but that will be in a future [41:49] date when we come back [41:50] with more information. [41:51] >> I'm just trying to help [41:52] in that community work part. [41:54] So, people know exactly when [41:55] to show up and when [41:56] to comment, because sometimes [41:57] any opportunity to comment [41:59] means people will come forward [42:01] to talk about something that [42:02] might not be the specific thing [42:03] you're asking for [42:04] in that moment. So, it sounds [42:05] like they should just continue [42:08] to keep coming forward every [42:10] opportunity that exists so that [42:11] way they don't miss the [42:12] opportunity to talk about [42:13] timeline and funding [42:14] accordingly. [42:17] >> Yeah, I think that's [42:18] correct. And we also are out [42:19] there obviously building the [42:20] light rail now. So, [42:21] construction relations is [42:22] deeply engaged door to door [42:24] with the community. So, we'll [42:25] continue to partner [42:26] with them so that if people [42:27] come to a construction update [42:28] meeting or our meeting, [42:30] we're sharing information. We [42:31] recognize the community sees [42:32] one Metro. So, we want to make [42:34] sure they always have those [42:35] opportunities [42:36] to share feedback. [42:37] >> And our December action [42:39] called on staff [42:40] to continue planning work on [42:42] the rail crossing safety [42:43] improvement. as well at the 6 [42:44] at-grade crossings along the [42:46] 2.5-mile corridor as part [42:48] of improvements to the [42:50] Metrolink Antelope Valley [42:52] Line. So, what is the status [42:53] of that work? And what is the [42:55] timeline [42:56] for those improvements to move [42:58] into construction? [42:59] >> Sure. So those 6 at-grade [43:00] crossings, they're in the 30% [43:02] preliminary design phase. And [43:04] so, we were about 20 to 25% [43:07] of the way through [43:08] with the consultant, [43:09] and we're planning to have 30% [43:10] preliminary design plans ready [43:12] for us to review sometime [43:13] around September. And so, we're [43:16] anticipating 30% completion [43:17] by late 2026, early 2027. That [43:19] will give us a lot [43:20] of information, of course, [43:21] in terms of those next steps [43:22] for costs and funding plans as [43:24] well. [43:25] >> Okay, thank you very much. [43:28] >> Director Najarian. [43:30] >> Thank you, Mike. I just want [43:33] to reiterate a lot of your [43:35] comments. I think this is just [43:37] an incredibly well-planned [43:41] project to place the Metrolink [43:44] station right there connecting [43:47] to the East San Fernando [43:48] Valley. It's going [43:50] to open up a new world [43:54] for the commuters in the [43:55] Antelope Valley who are [43:57] constrained. They don't have [43:58] much transit. Many [44:00] of them rely on the vehicles, [44:02] their cars, just because there [44:03] aren't that many other options. [44:04] This way, [44:07] someone who is employed [44:10] in that employment center [44:12] at the Van Nuys Courthouse, [44:13] state buildings, city [44:15] buildings, will be able [44:16] to take the Metrolink and [44:19] with a change, just change [44:21] once, and drop right down [44:24] into the Van Nuys Center using [44:25] the East San Fernando Valley. [44:27] And then future trips, as you [44:30] see, it's lining up [44:31] with our, [44:33] Sepulveda corridor route a [44:37] few years down the road. [44:39] But it's, I just think it's [44:41] really a very good and [44:43] well-thought-out series of [44:45] plans that have come together. [44:48] And I think it's just wonderful [44:50] and would just like to [44:52] congratulate planning staff as [44:55] all these projects just fit [44:56] together really well [44:59] at this location. So, thank [45:00] you very much and good work. [45:03] >> Any other comments? I just [45:05] want to share, Director [45:06] Najarian explained the [45:08] interlocking, which I [45:10] experienced actually a couple [45:11] weeks when I was in City of [45:12] San Fernando [45:14] for a meeting. I have [45:16] to admit I took a lot [45:17] of bows because my Metro pin [45:20] seemed to draw people [45:21] with smiles. So, thank you for [45:22] the outreach. I even took bows [45:24] for Metrolink. But I think [45:26] what's important is what you're [45:28] creating is a welcoming [45:29] atmosphere, and it is evidence [45:31] of a level of trust they have [45:34] that what you are saying is [45:36] going to happen. So, thank you [45:37] for that. Do we have any [45:39] comments from the public? [45:42] >> This is public comment [45:43] for item 9. Please press pound [45:44] 2 if you'd like [45:45] to make a comment [45:48] on this item. [45:49] >> Caller ending in 2074, [45:51] please state your name. [45:52] You have 1 minute [45:53] to state your comment. [45:57] That caller has lowered his [45:58] hand. [46:04] >> Did you unmute 2074? [46:08] >> Oh, they lowered their hand. [46:09] They just re-raised it. [46:10] Unmuting them now. [46:14] >> Sorry about that. Good [46:17] morning. Paula Basingana, [46:18] Planning Director for Council [46:20] District 7 in the City of LA. [46:21] On behalf of Councilwoman [46:23] Rodriguez, I'd like [46:24] to express her support [46:25] for this funding action. We are [46:26] grateful [46:27] to see the investment come [46:28] in a timely manner after the [46:30] board made the decision [46:31] to complete the northern [46:33] segment of the East San [46:34] Fernando Valley project via [46:35] this Metrolink connection. We [46:36] look forward [46:37] to continue working with Metro [46:39] to ensure this connection and [46:40] mobility hub is as successful [46:42] as possible. Thank you. [46:44] >> Thank the councilwoman. [46:46] >> That was the last public [46:47] comment. [46:48] >> Thank you. This is an action [46:50] item. And Madam Clerk, will you [46:51] please call the roll? [46:52] >> Can I get a motion and a [46:53] second, please? [46:55] >> Second. [46:56] >> Oh, wonderful. Thank you. [46:59] Vice Chair Solis? [47:00] >> Aye. [47:02] >> Director Mitchell? [47:03] >> Aye. [47:04] >> Director Najarian? [47:05] >> Aye. [47:06] >> Director Horvath? [47:07] >> Aye. [47:08] >> And Chair Dupont-Walker? [47:09] >> Aye. [47:10] >> The motion carries. Thank [47:11] you. [47:12] >> Thank you. Okay, I'm back [47:13] now. Item 10. Measure R [47:15] Multimodal Highway [47:17] Subregional Program [47:19] Semiannual Update. [47:22] >> Thank you, Chair. This is [47:24] the semiannual update for the [47:26] Measure R Highway Program. Up [47:28] with me are Robert Machuca, [47:29] Deputy Executive Officer, and [47:31] Avital Barnea, Senior [47:34] Executive Officer, [47:35] to make the presentation. [47:37] >> Thank you, Madam Chair and [47:38] committee members, for hearing [47:40] out our, our item. If you can [47:44] please bear with me, [47:45] it's a long set [47:47] of considerations, [47:48] but approving $125 million [47:50] in additional programming [47:51] with the capacity of Measure R [47:53] multimodal highway subregional [47:55] programs along with the funding [47:57] changes via the updated project [47:58] list shown in Attachment A, [47:59] approving the obligation of $8 [48:02] million [48:03] in previously approved Measure [48:05] R multimodal highway [48:06] subregional program funds and [48:07] reallocating to other existing [48:09] board-approved Measure R [48:10] projects, [48:12] or returning remaining funds [48:14] to the Measure R subregional [48:16] fund balance as shown in [48:17] Attachment A, and authorizing [48:19] the chief executive officer or [48:21] their designee to negotiate and [48:24] execute all necessary [48:25] agreements [48:26] for board-approved projects. [48:29] This chart provides an overview [48:31] of the Measure R program [48:32] with the various line items [48:34] in the Measure R. These are the [48:36] sub-regional programs that are [48:39] the responsibility [48:40] of the sub-regions to identify [48:41] and prioritize projects within [48:43] their sub-regional allocations. [48:45] As you can see, there's over [48:46] 350 projects that have been [48:48] vetted through this process [48:51] with the percentages that [48:53] you'll see on the right column [48:55] with the spent percentage [48:56] with how they're doing [48:58] with each of their individual [48:59] projects and programs in each [49:01] of the sub-regions. An example [49:04] of one of the projects [49:06] within this program is [49:07] within the city of Norwalk. [49:09] This is the Bloomfield Avenue [49:11] at Imperial intersection [49:12] improvements. This has a series [49:14] of various improvements looking [49:16] at doing some westbound left [49:19] turn lane improvements, [49:21] really allowing [49:23] for capacity to, [49:24] to function well there, [49:26] but also includes other [49:28] Mobility improvements, [49:29] such as ramp upgrades, meeting, [49:32] making sure that ADA standards [49:34] are being met, new crosswalks, [49:36] improved striping, and also [49:38] some bicycle facilities that [49:39] are in place will stay [49:41] in place. With regards [49:45] to equity-focused communities, [49:46] this update includes board [49:48] actions that advance the local [49:50] priority projects and EFCs [49:52] within cities of Bell [49:53] Gardens, Commerce, Downey, [49:54] Glendale, Los Angeles, [49:56] Paramount, Norwalk, and other [49:58] parts of unincorporated Los [49:59] Angeles County. So next steps [50:02] will be staff will continue [50:03] working with the subregions to [50:05] execute necessary agreements [50:06] and work [50:07] with the various subregions, [50:08] local jurisdictions [50:09] for their consideration [50:10] of multimodal, safe, equitable, [50:12] and sustainable investments [50:13] within the Measure R multimodal [50:16] highway subregional program. [50:21] With that being said, that [50:22] concludes my presentation. [50:25] >> Thank you. We are going to [50:27] handle this a little bit [50:28] differently today, and [50:29] before I call [50:31] for board members or myself [50:33] to comment, I want [50:35] to be sure, Madam Clerk, that [50:37] you're prepared to make [50:38] whatever changes will come. [50:41] Thank you. Okay, I have a [50:44] question. I appreciate the [50:45] semiannual update on Measure R [50:48] multimodal highway subregional [50:50] programs. These investments are [50:53] indeed critical [50:54] to improving the mobility [50:56] across the county [50:57] by addressing congestion, [50:59] enhancing safety, and [51:00] delivering projects that [51:01] reflect the unique [51:03] transportation needs [51:04] of each subregion. And that's [51:07] so important. I'd also like [51:08] to know how Metro is measuring [51:10] the success of these [51:13] investments. I know that [51:14] deliver, delivering timely [51:16] within budget is important. [51:17] Are there any other measures? [51:22] >> Certainly, yes. Well, first [51:24] of all, you're, you pointed out [51:25] something very important the, [51:27] the selection and [51:28] prioritization [51:29] of these projects [51:30] by the unique features of each [51:31] of the subregions. So that's [51:33] why we get a broad range [51:34] of various types [51:35] of projects that come through. [51:37] So, one [51:38] of our main responsibilities in [51:39] ensuring that these projects [51:41] are eligible within the [51:42] guidelines that we have in the [51:43] project we're also ensuring [51:45] that there's consistency [51:47] with a lot of the board actions [51:48] that have taken place such as [51:50] with BMT, complete streets [51:52] equity-focused elements that [51:54] the projects are consistent [51:56] with those line items. One [51:59] thing that I am excited to [52:00] announce is that we also have [52:02] been able to integrate all 350 [52:04] projects into the MyGrants [52:06] portal. And this is a portal [52:08] where cities are now being able [52:10] to utilize for consistency. It [52:13] cuts down on redundancy, labor, [52:16] manual entries of information [52:18] of their projects. They're able [52:20] to process their invoices [52:21] through this portal. So, this [52:23] portal has already been in use [52:24] with Measure M projects, [52:26] but we finally have been able [52:28] to integrate the Measure R [52:29] projects into the system. So, [52:31] it's a lot, it's going to [52:33] facilitate the process a lot [52:34] better. [52:35] >> That's really important, [52:36] especially as we talk about the [52:37] many sub-regional partners and [52:39] local agencies that are working [52:41] with us. Supervisor Solis. [52:45] >> Just a quick question. [52:47] Appreciate the presentation and [52:49] agree with a lot [52:50] of what we have before us, [52:52] but I wanted to ask, [52:53] and maybe it's not a big deal, [52:55] but there was 60, I think it [52:58] was $60 million that was [53:00] deobligated from a Caltrans [53:01] hotspot project from I-605 [53:04] intersection improvement, and I [53:05] wasn't clear where the fund [53:08] surplus was allocated to. [53:15] You see, it's a good thing. We [53:16] had a surplus, but where. [53:19] >> So those funds would [53:22] replenish the overall [53:23] subregional equity fund so that [53:25] we'd be eligible [53:27] for that subregion to apply [53:28] for another grant. [53:30] >> Yeah, the remaining. [53:31] >> Yeah, good. [53:32] >> It wasn't given [53:33] to a specific project [53:34] but is available for, [53:35] >> So, it's available. [53:36] Okay. [53:37] That's good to know. Thank [53:38] you very much. Thank you. [53:41] >> Supervisor Horvath, I'm [53:42] going to call Director [53:43] Najarian first, [53:44] and I'll come back [53:45] to you. [53:46] >> Yes, you're next. [53:48] >> Okay. Thank you. There's a [53:51] lot of projects here. Some [53:53] cities were able [53:55] to use them; others not. The [53:56] obligated and all that. [53:57] But I just want to, [53:59] I just put this [54:01] in perspective, that when [54:03] Measure R was passed. These [54:05] were intended [54:06] to be highway funds [54:08] to equalize and [54:10] to compensate those areas [54:13] of the city, of the county, [54:16] that did not have a significant [54:18] transit line going [54:19] through them. So, this is how [54:21] it all came about. It was only [54:22] later that this board decided [54:27] to make those funds more [54:29] flexible by permitting them [54:30] to be used [54:32] for pedestrian bike path, [54:33] active transportation, and [54:36] frankly, a very broad series of [54:39] other improvements. I think [54:42] that was Director Bonin who I [54:45] guess was spearheading that. [54:47] So, it has caused me some [54:51] heartburn when our COG and our [54:54] sector and our subregion is [54:59] trying to decide how [55:01] to use these funds. Often there [55:03] was a large demand [55:04] for the active transportation. [55:08] At that point, I was saying, [55:10] well, we really need [55:11] to reserve this [55:12] for some highway improvements, [55:14] on-ramps, off-ramps, [55:15] safety features. [55:17] But they said, no, [55:18] that's not what the Metro [55:19] Board wanted to do. They wanted [55:20] these funds [55:21] to be very flexible, very [55:23] broad, to serve all modes [55:24] of transit. So, I just want [55:27] to put that [55:28] out there as we deal with these [55:30] many different projects, some [55:31] highway, some active [55:33] transportation, pedestrian, [55:35] bike, and all that. This has [55:36] truly become a very broad and [55:39] flexible pool of money, [55:41] significant pool of money, [55:43] that the subregions [55:45] in their wisdom will decide how [55:46] to use. So, I just want [55:48] to put that out in terms of, [55:50] Being the historian, [55:51] I can only do this for like, [55:52] >> Very important. Yeah, very [55:53] important. [55:54] >> I won't do it anymore [55:55] after that. So that's all I [55:56] wanted to say. [55:57] >> No, no, the historical [55:58] memory is extremely important. [55:59] Thank you for sharing that. [56:01] Supervisor Horvath. [56:04] >> Thank you, Madam Chair. I do [56:06] know that that is the history, [56:08] and I appreciate your [56:10] acknowledgment of that. And I [56:11] also know we get to be the [56:14] policy-setting body that helps [56:16] to guide how we make [56:18] investment. And I think, [56:21] I know as part of the, our [56:23] board retreat and discussions [56:24] around impending fiscal cliff [56:26] and our financial [56:28] decision-making going forward, [56:30] I want to make sure that, [56:32] at least from my part, [56:33] that we're doing all we can [56:34] to invest in transit solutions [56:36] that provide alternatives [56:38] to people being in cars one [56:40] by one on all [56:42] of our streets and highways. [56:43] And so, I would ask if, [56:46] if you are open to it, Madam [56:48] Chair, that we would request [56:51] this item to be bifurcated [56:52] to vote on the $21 million [56:54] allocation for MR 35.74 [56:59] westbound SR 91 Alondra [57:01] Boulevard to Shoemaker Avenue [57:04] improvement project separately. [57:06] Thank you. [57:09] >> Let me get the consensus [57:11] of the committee. If there is [57:14] anyone who would object [57:15] to the item being bifurcated? [57:17] Okay, let me make sure the [57:19] public understands that what we [57:20] are proposing is to make an [57:23] adjustment and vote first on [57:25] the items minus the last item [57:29] referenced by Supervisor [57:31] Horvath. We'll make that [57:33] notation so that we're very [57:35] much aware of the first vote. [57:39] And then we would take a vote [57:42] on these items separately. [57:46] >> Appreciated. Thank you. [57:48] >> So I'll move the balance. [57:49] Well, have we done public [57:51] comment? [57:52] >> Yeah, we haven't gotten [57:53] there yet. Are we ready? [57:56] Okay. Is there a member [57:58] of the public that wishes [57:59] to speak [58:00] on the items minus SR 91? [58:02] >> There's public comment [58:03] for item 10. Please press pound [58:04] 2 if you'd like to make, [58:05] >> You know what, let's just [58:06] speak on all of them. [58:07] >> Yes. [58:08] >> Yes. Item 10 as a whole. [58:09] Yes. No public comments. [58:13] >> Okay, a motion's [58:15] in order. [58:16] >> So accepting the bifurcation. [58:20] >> As on the screen. [58:22] >> As, oh, yeah, we're [58:23] on the screen already. [58:24] >> We're ready. Our clerk is [58:26] ready. [58:27] >> Okay, there we go. So I [58:28] guess I will move item 10A1. [58:33] 10A. [58:34] >> Do I have a second? Okay, [58:36] moved and seconded that we [58:39] approve item 10A.1. Will you [58:41] call the roll? [58:42] >> Vice Chair Solis? [58:44] >> Aye. [58:45] >> Director Mitchell? [58:46] >> Aye. [58:47] >> Director Najarian? [58:48] >> Aye. [58:49] >> And Chair, excuse me, [58:52] Director Horvath? [58:54] >> Aye. [58:55] >> And Chair Dupont-Walker? [58:57] >> Yes. [58:58] >> The motion carries. [58:59] >> Thank you. [59:00] >> And now we will move [59:03] to the next item. [59:05] >> Just give it a second [59:06] to reset so she can. [59:07] There we go. [59:08] >> Okay, could I have a motion, [59:09] please? [59:13] >> This is, [59:15] so that the first one was for, [59:16] we had pulled [59:18] out just the one section, [59:19] so it was A1, [59:22] which removed the one section, [59:24] B and C. So, then this 2nd vote [59:29] is just for the Shoemaker [59:31] Avenue project approval. [59:34] >> As presented. [59:35] >> Correct? [59:36] >> So, what would the proper [59:38] name of that motion be? [59:40] >> You can move it [59:41] to approve it, just this [59:43] project. [59:44] >> I will move just this [59:45] project. [59:46] >> There you go. [59:47] >> Do I have a 2nd? [59:48] >> I'll second. Please call [59:50] the roll, Madam Clerk. [59:52] >> Vice Chair Solis? [59:53] >> Aye. [59:55] >> Director Mitchell? [59:56] >> Aye. [59:57] >> Director Najarian? [59:58] >> Aye. [59:59] >> Director Mitchell, excuse [1:00:01] me, Director Horvath? [1:00:03] >> No. [1:00:04] >> And Chair Dupont-Walker? [1:00:05] >> Yes. [1:00:06] >> The motion carries. [1:00:08] >> Thank you. We now move [1:00:10] to item 11, Measure M 10-Year [1:00:13] Comprehensive Assessment [1:00:14] Objectives and Criteria. Do we [1:00:17] have a presentation? [1:00:21] >> Yes, we do, Chair. Ray [1:00:23] Sosa, Chief Planning Officer, [1:00:24] accompanied by Mike O'Connor, [1:00:25] Executive Officer, and Paul [1:00:27] Backstrom, Senior Director, [1:00:29] will go [1:00:30] through the presentation [1:00:31] on the Measure M 10-Year [1:00:32] Comprehensive Assessment [1:00:33] Objectives and Criteria. [1:00:36] >> Thank you again, Madam [1:00:37] Chair, members [1:00:38] of the committee. This is kind [1:00:40] of actually building on [1:00:42] Director Najarian's earlier [1:00:43] comments about Measure M and [1:00:45] the history of it. This is [1:00:46] really a through line from [1:00:48] Measure M as a bottoms-up, [1:00:50] transparent, consensus-based [1:00:51] sales tax measure securing 71% [1:00:53] of the vote and the [1:00:55] accountability measures that [1:00:56] were built into that ordinance [1:00:58] that have helped provide the [1:01:00] structure for Measure M going [1:01:02] forward and allowing [1:01:03] for an opportunity 10 years [1:01:04] later [1:01:05] to do a comprehensive [1:01:06] assessment of the measure [1:01:07] to set ourselves up [1:01:08] for the next decade. [1:01:09] of delivering Measure M [1:01:10] in the region. So, with that, [1:01:11] I'll begin the presentation. [1:01:14] So, our recommendation today is [1:01:17] to approve the objectives and [1:01:18] the criteria for the Measure M [1:01:20] 10-Year Comprehensive [1:01:21] Assessment. This action is [1:01:24] consistent with the Measure M [1:01:25] guidelines, and in addition [1:01:27] to what the ordinance directs, [1:01:28] the guidelines also state that [1:01:31] the Measure M Independent [1:01:33] Taxpayer Oversight Committee [1:01:34] shall review the objectives and [1:01:36] criteria prior to presentation [1:01:37] to the board. We completed that [1:01:39] step in June, presenting [1:01:41] to them, and so we are now [1:01:43] bringing this item forward [1:01:44] to the board this cycle to [1:01:45] approve these objectives and [1:01:46] criteria. Next slide. So, the [1:01:50] fundamental purpose of the [1:01:52] comprehensive assessment is to [1:01:54] provide accountability and [1:01:55] transparency in how Metro and [1:01:57] our partners are performing [1:01:58] in the delivery [1:01:59] of the voter-approved Measure M [1:02:00] program and [1:02:01] to use that information [1:02:02] to guide our actions [1:02:04] over the next decade. The [1:02:06] ordinance requires the [1:02:07] preparation of a comprehensive [1:02:08] assessment every 5 years. You [1:02:10] may recall that we had our [1:02:11] first 5-year assessment for [1:02:13] Measure M in October of 2023, [1:02:14] which this board approved. [1:02:17] At the 10-year interval mark, [1:02:19] the Measure M ordinance also [1:02:21] requires that Metro assess and [1:02:23] expenditure plan major projects [1:02:24] and multi-year subregional [1:02:25] programs, or MSPs to see how [1:02:27] they are completed or [1:02:30] anticipated to be completed [1:02:31] during the next 10-year period. [1:02:33] That means when we go through [1:02:34] this assessment process, [1:02:36] we're looking back 5 years, [1:02:38] but also looking forward 10 [1:02:39] years, creating a 15-year [1:02:41] fiscal year window. So, [1:02:44] to prepare for this work, [1:02:45] we have to do several things. [1:02:47] We have to estimate the [1:02:49] financial capacity for Measure [1:02:50] M and compare our forecasted [1:02:52] revenues against our [1:02:53] anticipated expenditures. We [1:02:55] also have to assess project and [1:02:57] program benefits associated [1:02:58] with Measure M investments. [1:03:00] coordinate [1:03:01] across the agency departments [1:03:03] with numerous teams, [1:03:05] conduct stakeholder engagement, [1:03:06] which will be a critical [1:03:07] element of this work [1:03:09] to ground our findings [1:03:10] in the lived experiences [1:03:11] of our riders and also [1:03:12] to gather feedback [1:03:14] on any proposed amendments we [1:03:15] may bring forward to you. And [1:03:16] finally, [1:03:17] once the assessment is [1:03:18] complete, we will bring it [1:03:19] to the Board for consideration [1:03:20] along [1:03:21] with any potential amendments. [1:03:22] One key item, just we want to [1:03:24] keep saying this every time we [1:03:25] come back to you, is that the [1:03:27] end process requires a 2/3 vote [1:03:31] to approve the comprehensive [1:03:32] assessment and a 2/3 vote [1:03:33] to approve any amendments. So [1:03:35] that consensus building, that [1:03:37] transparency, that community [1:03:38] engagement, [1:03:39] we take that very seriously [1:03:41] during this process. We want [1:03:42] to come back to you [1:03:43] with the opportunity [1:03:44] to have items [1:03:45] before you that will allow [1:03:46] for that consensus [1:03:47] to take hold. So, the framework [1:03:52] and the objectives [1:03:54] for the assessment. There's 2 [1:03:55] major analyses that compose the [1:03:57] assessment framework. Part 1 is [1:04:00] that system-wide assessment [1:04:01] of progress to date, [1:04:03] going back the past 5 years and [1:04:05] building on the first 5-year [1:04:07] assessment that we conducted. [1:04:08] It's a state of the system and [1:04:10] a quality-of-life assessment [1:04:11] of the administration of [1:04:12] Measure M to date. It will [1:04:15] encompass a broad range of [1:04:16] analysis that includes [1:04:18] revenues, expenditures, [1:04:19] major project status, Metro [1:04:21] employment and vacancy rates, [1:04:24] access to opportunity, [1:04:25] and economic benefits, as well [1:04:27] as some external factors that [1:04:30] are affecting the construction [1:04:31] market outlook. The assessment [1:04:33] objectives and criteria [1:04:34] in this report primarily apply [1:04:35] to this portion [1:04:36] of the analysis. The work [1:04:38] that's completed in Part 1 will [1:04:40] then inform our work in Part [1:04:42] 2, which is the capital project [1:04:43] and program assessment. This [1:04:45] portion is the evaluation of [1:04:47] the expenditure plan major [1:04:48] projects and programs including [1:04:50] the MSPs, that are completed or [1:04:52] anticipated to be completed [1:04:53] in the next 10-year period. We [1:04:55] are developing a project [1:04:56] evaluation framework, metrics, [1:04:58] and weighting for this work, [1:04:59] which we'll bring [1:05:00] to you this fall. The 5 [1:05:03] recommended assessment [1:05:04] objectives, which you see [1:05:06] on the right, carry over [1:05:07] from the 2023 assessment that [1:05:08] we conducted [1:05:10] with a minor revision [1:05:11] to the first objective, which [1:05:13] really broadens our analysis to [1:05:14] include other actors that are [1:05:16] delivering Measure M projects [1:05:18] and implementing projects [1:05:20] funded by Measure M in terms [1:05:21] of direct and subrecipients [1:05:24] of Measure M funds. We want to [1:05:26] make sure it's a holistic [1:05:27] approach to everyone involved [1:05:29] in delivering Measure M. The [1:05:30] language used in these 5 [1:05:31] objectives draws directly [1:05:32] from the Measure M ordinance to [1:05:35] ensure that we are meeting the [1:05:36] requirements of the ordinance [1:05:38] in preparing the assessment. [1:05:42] So, the proposed assessment [1:05:43] criteria, similar [1:05:47] to the objectives, it builds [1:05:49] upon those that were used [1:05:52] in the 2023 Measure M 5-year [1:05:54] assessment [1:05:55] with some modifications to [1:05:56] address the specific needs that [1:05:57] are required [1:05:58] for the 10-year assessment. [1:05:59] So, we began [1:06:00] with those criteria [1:06:01] from the 5-year assessment, [1:06:03] and we modified them [1:06:04] to reflect relevant changes [1:06:05] since then, [1:06:06] including recommendations [1:06:07] from the Oversight Committee [1:06:09] and Metro staff that were [1:06:12] included in the Measure and [1:06:13] 5-Year Assessment report. We [1:06:15] had board direction via motion [1:06:16] at that time when the board [1:06:18] approved the 2023 report, [1:06:20] and that is included. We also [1:06:21] have report recommendations [1:06:24] themselves from the 5-Year [1:06:25] Assessment that we wanted [1:06:27] to continue forward, and again, [1:06:28] the needs that are specific [1:06:30] for the, the ordinance's [1:06:32] 10-year assessment [1:06:33] requirements. So, there are 7 [1:06:37] assessment areas. There's a lot [1:06:39] on the screen, so I won't go [1:06:41] through the entire thing. This [1:06:43] is all in Attachment A [1:06:45] to the report, [1:06:46] but essentially, it's, [1:06:48] this is a sampling [1:06:49] of those criteria. So [1:06:51] basically, it's not the entire [1:06:53] element, but it's, [1:06:54] it gives you a good sense [1:06:55] of what's in each [1:06:56] of these assessment areas. 2 [1:06:59] new assessment areas have been [1:07:00] added to the original 2023 [1:07:02] criteria. The first is the [1:07:04] planning assessment area, [1:07:06] which includes 2 criteria. The [1:07:07] first one related to project [1:07:09] performance as amended [1:07:10] by the board with the adoption [1:07:11] of the 2023 Comprehensive [1:07:13] Assessment and whether Measure [1:07:15] M is helping to address the [1:07:17] board-adopted VMT targets or [1:07:18] vehicle miles traveled. The [1:07:20] second new assessment area is [1:07:22] economic impact, and that will [1:07:24] examine direct and indirect [1:07:26] jobs created during and after [1:07:28] project implementation and [1:07:29] examine the cost-benefit of [1:07:31] Measure M projects and programs [1:07:32] consistent with their [1:07:34] cost-benefit analysis process. [1:07:37] Equity is pulled [1:07:38] out as its own assessment area, [1:07:40] and consistent [1:07:41] with staff recommendations [1:07:42] in the 2023 5-year assessment, [1:07:44] we are working very closely [1:07:45] with the Office of Equity and [1:07:47] Race to improve our definition [1:07:49] for access [1:07:51] to opportunity and what it [1:07:52] means for the 10-year [1:07:53] comprehensive assessment as we [1:07:55] go forward. So, the application [1:07:56] of these criteria in totality [1:07:59] will produce a transparent [1:08:01] examination of how Metro and [1:08:02] its agency partners have [1:08:04] invested Measure M dollars, [1:08:05] whether set-asides [1:08:07] for operations and state of [1:08:08] good repair have been [1:08:10] sufficient, how revenues and [1:08:11] expenditures are tracking [1:08:12] against our original forecast, [1:08:14] identify associated benefits [1:08:15] of Measure M and who benefits, [1:08:18] and examines the external [1:08:19] forces that have complicated [1:08:21] project delivery and prepare us [1:08:23] for the next decade [1:08:24] of investment. So [1:08:28] for the financial capacity, [1:08:30] we're in the process [1:08:31] of developing this analysis to [1:08:33] determine whether there is [1:08:34] capacity [1:08:35] to add new projects or programs [1:08:36] to Measure M. The financial [1:08:37] forecast that was prepared [1:08:39] for the Metro 2025 [1:08:41] Short-Range Transportation [1:08:43] Plan demonstrated that Measure [1:08:44] M revenue is down from the [1:08:46] original revenue forecast [1:08:48] in the 2016 expenditure plan. [1:08:50] However, we are currently [1:08:51] updating the financial forecast [1:08:52] based on the UCLA Anderson [1:08:54] School of Business sales tax [1:08:56] forecast and that will be used [1:08:58] to inform stakeholder [1:08:59] discussions and coming [1:09:00] recommendations [1:09:01] of any potential amendments [1:09:03] to the expenditure plan. So, as [1:09:07] you look forward [1:09:08] for the next steps again, [1:09:10] this is a long process. We have [1:09:11] various touchpoints [1:09:12] with you and the Oversight [1:09:13] Committee and the public as we [1:09:15] move towards that Board action [1:09:16] in fall of 2027. [1:09:18] With the approval [1:09:20] of the objectives and criteria, [1:09:22] today and at the full board, [1:09:24] we'll begin an extensive data [1:09:25] collection process [1:09:26] to prepare the assessment. [1:09:28] In the fall of this year, [1:09:29] we will bring to the board a [1:09:30] project evaluation framework [1:09:33] with metrics and weighting [1:09:35] to prepare to assess Measure M [1:09:37] expenditure plan projects. [1:09:39] In spring 2027, we will bring a [1:09:40] draft assessment and proposed [1:09:42] draft amendments to the both [1:09:44] the board and the oversight [1:09:46] committee [1:09:47] for discussion and feedback. [1:09:49] Following that process, we'll [1:09:50] incorporate the direction that [1:09:51] is received [1:09:52] to complete the final work on [1:09:54] the assessment draft [1:09:55] recommendation and draft [1:09:56] amendments, excuse me, the [1:09:57] assessment and the draft [1:09:59] amendments. Then we'll come [1:10:00] back to the Oversight [1:10:01] Committee in the summer [1:10:02] for review and comment on the [1:10:04] assessment and any necessary [1:10:05] findings [1:10:06] on the proposed amendments, [1:10:07] and then incorporate all [1:10:09] of that recommendations, [1:10:10] feedback, etc., and come back [1:10:11] to the Board in fall 2027 to [1:10:13] present the final assessment, [1:10:15] which will require a 2/3 vote, [1:10:16] and any proposed amendments, [1:10:18] which require a 2/3 vote. [1:10:19] Stakeholder engagement, [1:10:21] of course, will be conducted [1:10:22] throughout this process. It's [1:10:23] very important that we continue [1:10:24] to engage our communities and [1:10:26] those that helped pass Measure [1:10:28] M and share the vision with us [1:10:29] to implement what is in [1:10:31] Measure M, and that will help [1:10:32] ground truth our findings and [1:10:33] assess the amendment process as [1:10:35] we go forward. And I believe [1:10:37] that is the final slide. I'd be [1:10:38] very happy to take any [1:10:39] questions or receive direction. [1:10:40] Thank you. [1:10:44] >> Thank you for that very [1:10:46] comprehensive report. Do we [1:10:47] have any members [1:10:48] of the public who've requested [1:10:50] to speak? [1:10:51] >> This public comment [1:10:52] for item 11. Please press pound [1:10:53] 2 if you'd like [1:10:55] to make a comment. No public [1:10:59] comments. [1:11:02] >> Public comment is now [1:11:04] closed. I believe, and, [1:11:06] and this is a nostalgic moment [1:11:07] for me as I think about [1:11:08] Director Najarian and the [1:11:11] historic memory that he has and [1:11:14] the years that he has put in [1:11:16] to make sure that all [1:11:17] of this came to fruition. I [1:11:19] remember the trips around [1:11:21] Measure M, crowding [1:11:23] in cars going from the San [1:11:24] Fernando Valley to San Pedro [1:11:27] to the beach cities, all [1:11:29] to talk about Measure M. And I [1:11:31] just think [1:11:33] about you wanting this being [1:11:34] one of your legacy projects [1:11:36] because you were [1:11:37] one of those who seemed [1:11:38] to be able to talk [1:11:39] to all kinds of audiences, [1:11:41] and I was amazed. [1:11:44] >> Are you calling me old? [1:11:47] >> That means I was there. [1:11:48] >> What does that mean? [1:11:50] >> No. [1:11:51] >> Just briefly, I think it [1:11:52] was, it's a huge testament [1:11:54] to the residents of LA County [1:11:57] who stood up and accepted not [1:11:59] one [1:12:00] but two sales tax measures. [1:12:02] And I can't say the [1:12:03] immeasurable credibility that [1:12:05] gives us when we go to [1:12:06] Washington or to Sacramento [1:12:07] and ask [1:12:09] for funding because they say, [1:12:11] you guys stood up and made it [1:12:13] happen, and you're putting your [1:12:15] money where your mouths are. [1:12:16] Of course, leadership from the [1:12:18] supervisors and the mayors that [1:12:20] were, [1:12:21] LA mayors that were involved [1:12:23] in this, and board members, as [1:12:24] well as yourself and others who [1:12:28] we've sat with, [1:12:30] played a great role in that. [1:12:31] So I'm just, I was just part [1:12:33] of the team. Thank you. [1:12:34] >> And I know we're not [1:12:35] supposed to offer trinkets, but [1:12:36] I do remember the M&M's that we [1:12:38] carried and how popular we were [1:12:40] with them. But this certainly [1:12:44] is a testament [1:12:45] to voter confidence, and it's [1:12:48] so important as we look forward [1:12:50] to stimulating this ridership [1:12:52] explosion that has started [1:12:54] with FIFA, but also [1:12:56] to find ways to meet the [1:12:58] emerging challenges and [1:12:59] opportunities, preparing [1:13:02] for major events, adapting [1:13:04] to evolving travel patterns, [1:13:06] embracing new technology, and [1:13:09] building the most resilient and [1:13:11] sustainable transportation [1:13:13] system in the world. Thank you, [1:13:15] CEO Wiggins and Metro staff, [1:13:17] for developing this framework, [1:13:20] and we look forward to what is [1:13:22] to come. I see requests from [1:13:25] Supervisor Solis. [1:13:27] >> Yes, thank you. [1:13:28] I too want to join you and, [1:13:29] and thank you and, and Ara and [1:13:31] all the folks that really made [1:13:33] this all possible. It seems [1:13:35] like 10 years went [1:13:36] by so fast, and this is my, [1:13:38] going on my 12th year, [1:13:40] and some of us won't even be [1:13:41] on the board [1:13:43] by the time they get to 27, [1:13:45] year 27. So I'll be watching. [1:13:48] But I want to say that it's [1:13:49] been my privilege to serve on [1:13:51] this board and actually see the [1:13:54] workings of Measure M and how [1:13:56] we were able to meet the needs [1:13:57] of our community. And I, [1:13:59] for one, will say I got [1:14:00] to sit here and be able [1:14:01] to vote on some very [1:14:02] significant projects, [1:14:04] like the Gold Line extension [1:14:05] to Pomona that some people [1:14:08] thought would never happen, [1:14:10] the Metro Regional Connector [1:14:13] that we saw famously, and the [1:14:16] NoHo to Pasadena BRT. Ara, come [1:14:18] on, we were there [1:14:20] in those battles. It's tough. [1:14:23] And it's still tough, [1:14:24] but we're getting there. And [1:14:25] I'm very excited about the [1:14:26] Eastside extension and also [1:14:27] Sela, cause that's kind [1:14:29] of where, well, it was called [1:14:30] Sela before, that line. [1:14:32] But just [1:14:33] to say how far we've come. And [1:14:35] I know that there's going [1:14:36] to be a lot [1:14:37] of assessment feedback coming [1:14:38] in from all parts [1:14:40] of our communities [1:14:41] in the county, but I do want [1:14:42] to say that that we look [1:14:45] at also keeping our commitment [1:14:47] to the voters. Because I know [1:14:49] in my situation with the [1:14:51] Eastside Gold Line, we knew [1:14:54] that there was funding for 2 [1:14:56] rails, 2 rails that could have [1:14:59] been proposed. One was R60, [1:15:03] right? And that didn't happen [1:15:04] because we didn't have [1:15:06] sufficient funding. So there [1:15:08] was a decision made to go [1:15:09] to a BRT. from down here in [1:15:12] El Monte all the way out to [1:15:13] Pomona. And that was a way of [1:15:15] still continuing our commitment [1:15:17] to our communities out there [1:15:19] that still don't have that area [1:15:23] covered in a rail system. So I [1:15:24] would hope that we would think [1:15:27] about committing to keeping the [1:15:29] monies that were set aside [1:15:32] for SR 60 to stay in the area [1:15:35] for the East LA Gold Line [1:15:38] because it still will impact [1:15:41] the areas in Whittier, going [1:15:42] through Whittier and extending [1:15:44] as far as we can from East LA [1:15:46] out [1:15:47] to those different communities. [1:15:48] And I believe it's an [1:15:49] obligation that we made. And it [1:15:52] was pretty clear [1:15:53] to me what the trade-offs were. [1:15:55] But not to say that somehow [1:15:56] this money then could be left [1:15:59] over and reprogrammed somewhere [1:16:01] else for something else. [1:16:02] I think that would really go [1:16:04] against the grain of what our [1:16:05] commitment was and what we sold [1:16:07] our communities on, that we, we [1:16:09] were lifting up these equity [1:16:12] areas. So for me, that would, [1:16:14] that would be something that I [1:16:15] would like to be [1:16:16] on record for. Thank you very [1:16:17] much. [1:16:19] >> Supervisor Horvath. [1:16:21] >> Thank you, Madam Chair. In [1:16:23] 2023, along with consideration [1:16:24] of the 5-year assessment, [1:16:26] our board adopted a set [1:16:28] of evaluation criteria, [1:16:29] and I see some [1:16:30] of that being incorporated [1:16:32] in what you presented. Thank [1:16:33] you for that. [1:16:34] But I'm not seeing some others, [1:16:36] and so I just, for example, [1:16:37] wanted to highlight under the [1:16:39] economic impact criteria will [1:16:42] staff be evaluating access to [1:16:43] jobs as well as direct and [1:16:45] indirect job creation? [1:16:48] >> Yes, Supervisor. Our equity [1:16:50] assessment area will include [1:16:52] criteria for measuring access [1:16:53] to opportunity, and that also [1:16:54] includes examining access [1:16:56] to jobs. So yes. [1:16:58] >> Okay, and will staff [1:17:00] evaluate whether projects and [1:17:03] programs are anticipated [1:17:05] to connect [1:17:06] to major economic centers, [1:17:08] which we know will increase [1:17:10] sales tax growth, [1:17:11] which I know you sort of led [1:17:13] with that we're not on track [1:17:15] at this point. So, if that's [1:17:18] being done, [1:17:19] where is that criteria [1:17:20] captured, and where does [1:17:23] project feasibility and [1:17:24] competitive competitiveness [1:17:26] for local, state, [1:17:27] or federal dollars factor [1:17:28] into the criteria? [1:17:29] >> Sure, thank you. There's 3 [1:17:31] areas that I would focus on. [1:17:32] The first is the planning [1:17:34] assessment area [1:17:35] with a criterion that's [1:17:36] specific to connectivity. Under [1:17:37] the equity assessment area, [1:17:39] there's also some, some [1:17:41] elements there that are focused [1:17:42] on that. And then you have the [1:17:43] access to opportunity. So, all [1:17:45] 3, I mean, there may not be one [1:17:46] direct hit on it, but there's [1:17:47] 3 areas that converge [1:17:49] on that will help us to explore [1:17:50] that area that you requested. [1:17:52] >> And the Board report notes [1:17:55] criteria being incorporated [1:17:58] into both retrospective [1:18:00] evaluation as well as [1:18:02] prospective. And I saw a lot [1:18:04] of the retrospective in [1:18:05] Attachment A, [1:18:07] and that was very helpful. [1:18:09] Where will we see the criteria [1:18:10] being factored into prospective [1:18:12] analysis? [1:18:14] >> I appreciate that. So, we're [1:18:15] setting up the look back first, [1:18:17] and then we'll be coming back [1:18:18] in the fall with a report on [1:18:19] the project evaluation [1:18:21] framework, the metrics, the [1:18:22] weighting, [1:18:23] the look forward part. So, [1:18:24] we're kind [1:18:25] of setting up how we've done [1:18:26] to date first, [1:18:27] and then we're transitioning. [1:18:28] So, you will see that in the [1:18:29] fall when we come back. [1:18:30] >> Okay. And just [1:18:31] on the going forward, I think [1:18:32] the more explicit we can be [1:18:33] in sort of highlighting since [1:18:34] the board passed that criteria [1:18:36] how we're addressing that [1:18:37] criteria in evaluation, I [1:18:39] think, [1:18:40] I know that would be helpful [1:18:41] to me and maybe [1:18:42] for others as well. Thank you. [1:18:45] >> Supervisor Mitchell. [1:18:47] >> Thank you, Madam Chair, and [1:18:49] I'm looking forward [1:18:51] to this process. I'm glad [1:18:53] to join this committee again [1:18:54] to have this opportunity to [1:18:57] take this 10-year comprehensive [1:18:59] assessment. [1:19:01] On your assessment area slide, [1:19:03] I think it's slide 6, I just [1:19:04] want to comment on the first [1:19:05] bullet and the last bullet, the [1:19:07] financial analysis and equity. [1:19:11] I am hoping to learn from the [1:19:13] assessment's analysis whether [1:19:17] our operations and our [1:19:18] maintenance funding has been [1:19:20] sufficient [1:19:21] for existing budgets, as well [1:19:24] as if our current operations [1:19:25] and maintenance funding levels [1:19:27] are going to meet the needs [1:19:28] of our growing system. That's [1:19:30] going to be really, I think, [1:19:31] important to me, [1:19:32] particularly as operations [1:19:34] chair, and really trying [1:19:35] to make sure I keep my eye on [1:19:36] the operations and maintenance [1:19:37] budget. Because [1:19:40] from my perspective, it, it [1:19:42] funds and fuels the core [1:19:45] element of our system. And so, [1:19:47] I am hoping that the assessment [1:19:49] will give me that kind [1:19:51] of insight. [1:19:55] >> Yes, we've received clear [1:19:56] direction, [1:19:58] and we are not doing this work [1:19:59] in a silo, even though the [1:20:00] assessment itself and the [1:20:02] comprehensive assessment is [1:20:03] more of a capital assessment. [1:20:05] We are not bifurcating [1:20:06] in any way, shape, or form, and [1:20:07] have had clear direction that [1:20:08] where are there, [1:20:10] where there are opportunities [1:20:12] to reduce our reliance on [1:20:14] operations-eligible funding or [1:20:15] assist that in any way, [1:20:17] we are seeking them. So, we've [1:20:19] already started our work there, [1:20:21] and we understand the marching [1:20:22] orders. [1:20:23] >> Thank you. I appreciate [1:20:24] that. I understand both in the [1:20:27] report and you articulated that [1:20:28] you're working [1:20:29] on the definition of access [1:20:31] to opportunity under equity. [1:20:33] And so, I'll be interested in [1:20:35] hearing what that ultimately is [1:20:36] defined as, but I'm hoping that [1:20:38] we think broadly, macro versus [1:20:44] micro, when we think [1:20:46] about access to opportunity, [1:20:47] and that it's not just making [1:20:49] sure people, [1:20:51] that we're not just focusing [1:20:52] on access to work and school, [1:20:53] but, [1:21:29] medical facility, but [1:21:31] that's not an urgent care or a [1:21:33] hospital. So, we're trying [1:21:34] to do some of that work [1:21:35] in culling through the data. [1:21:36] >> Thank you very much [1:21:37] for that. [1:21:38] Thanks, Madam Chair. [1:21:39] >> Okay, this is an action [1:21:40] item. Could I have a motion and [1:21:41] second, please? [1:21:44] >> Second. [1:21:45] >> Thank you. Madam Clerk, will [1:21:47] you please call the roll? [1:21:48] >> Vice Chair Solis? [1:21:50] >> Aye. [1:21:51] >> Director Mitchell? [1:21:52] >> Aye. [1:21:53] >> Director Najarian? [1:21:54] >> Aye. [1:21:55] >> Director Horvath? [1:21:56] >> Aye. [1:21:57] >> And Chair Dupont-Walker? [1:21:58] >> Aye. [1:21:59] >> The motion carries. [1:22:00] >> Thank you. Moving to item [1:22:01] 12, Eastside Transit Corridor [1:22:02] Phase 2 Project. [1:22:06] >> Thank you, Madam Chair. Ray [1:22:08] Sosa, Chief Planning Officer, [1:22:10] being joined at the desk by [1:22:13] Jill Liu, who is our project [1:22:16] manager and senior director [1:22:18] for the East Side, and our [1:22:19] senior executive officer, [1:22:20] David Meagher, to initiate the [1:22:22] presentation. [1:22:24] >> Thank you, Ray. I think [1:22:26] Director Solis may have already [1:22:28] given our introduction for this [1:22:29] project just a few moments ago. [1:22:31] But this is a project that's [1:22:33] been coming a long, long time. [1:22:34] Eastside, the first cycle 1, [1:22:36] the phase 1 [1:22:37] of the project was completed, [1:22:38] and now we have a chance [1:22:40] to complete a project that gets [1:22:41] to Whittier Boulevard, serves [1:22:42] Atlantic, gets over to City [1:22:43] of Commerce, which has more [1:22:45] attendees than Disneyland, they [1:22:47] claim, every year, as a major, [1:22:49] at the head [1:22:50] of the I-5 freeway coming in [1:22:52] from the south, [1:22:54] a major transfer point [1:22:55] from cars to get [1:22:56] into transit and move [1:22:57] through the east side to get [1:22:58] to downtown. So, this has been [1:22:59] a long time coming, and I think [1:23:01] we have a progress report on a [1:23:02] major milestone that we're [1:23:03] achieving [1:23:04] with the project right now. [1:23:05] And I'll turn it over to [1:23:06] Jill, our project manager. [1:23:09] >> Good morning, Chair [1:23:10] Dupont-Walker and committee [1:23:12] members. Staff is here [1:23:13] to present agenda item number [1:23:14] 12 for the Eastside Transit [1:23:15] Corridor Phase 2 project. This [1:23:17] is a 9-mile project, as David [1:23:19] mentioned, from East LA to [1:23:20] Whittier. This 9-mile project [1:23:22] has been environmentally clear [1:23:23] under CEQA. After 19 years [1:23:25] of making in the history. And [1:23:28] right now, we're focused on [1:23:29] design and federal [1:23:31] environmental clearance for the [1:23:33] initial 4.7-mile alignment [1:23:35] for this project. In May, we [1:23:37] published the NEPA document [1:23:39] environmental assessments, [1:23:40] and then in June, we completed [1:23:42] the public review process based [1:23:43] on the findings of the [1:23:45] environmental assessment and [1:23:47] the feedback received [1:23:48] from the public and agencies. [1:23:50] We are recommending 3 [1:23:51] recommendations [1:23:52] for the board's consideration [1:23:54] to receive and file the NEPA [1:23:55] document, including the project [1:23:57] mitigation measures [1:23:58] for the LPA, a 4.7-mile IOS [1:24:01] to Montebello. Also approve a [1:24:04] new and smaller maintenance and [1:24:06] storage facility, MSS Site 3, [1:24:08] in the City of Commerce [1:24:10] for the board-approved LPA, [1:24:12] while maintaining the entire [1:24:13] 9-mile project all the way to [1:24:15] Whittier and the end of [1:24:16] Lambeau Road in Whittier. [1:24:18] That's the full project [1:24:19] definition. And then amending [1:24:21] the 2020 Long-Range [1:24:23] Transportation Plan to reflect [1:24:24] the board LPA and the new MSF [1:24:26] site for the Eastside Phase 2 [1:24:28] project. Just for context, [1:24:30] this project has been [1:24:33] in the making for 19 years. As [1:24:35] I mentioned, the existing E [1:24:37] Line currently has 22 miles [1:24:38] long and 29 stations and [1:24:40] provides 1-seat rides from [1:24:42] East LA to Santa Monica. Once [1:24:44] the full 9-mile project is [1:24:46] built, [1:24:47] this project will extend the E [1:24:49] Line service to 30 miles, 31 [1:24:51] miles long with 7 new stations [1:24:53] connecting more people [1:24:55] to more jobs and more places. [1:24:57] Similar to the other Metro [1:24:59] Rail projects, we will be [1:25:00] implementing the project [1:25:02] in phases [1:25:03] with the initial phase to [1:25:04] Montebello connecting the [1:25:05] hearts of East LA, Commerce [1:25:06] Citadel that has 17 million [1:25:07] visitors, and then downtown [1:25:09] Montebello. And the future [1:25:11] extension will further extend [1:25:12] the E Line by another 4 miles [1:25:14] to, from Montebello to [1:25:16] Whittier. Because the 9 Mile [1:25:17] project has been [1:25:19] environmentally clear [1:25:20] under CEQA, and the project has [1:25:21] well-defined alternative and [1:25:23] station alignment, [1:25:25] we have FTA's approval for this [1:25:26] 1-year expedited NEPA process [1:25:29] so that we can make a federal [1:25:31] action for funding [1:25:33] for this project. This new [1:25:34] alignment, the IOS, [1:25:36] will include 3.1 miles [1:25:38] underground from East South [1:25:40] Atlantic Station to Commerce [1:25:41] Citadel. 0.9 miles [1:25:44] of aerial alignment north of, [1:25:47] near the Garfield-Washington [1:25:49] intersection in Commerce, and [1:25:50] then 0.7 miles [1:25:53] of street-level alignments in [1:25:54] Montebello. The NEPA study also [1:25:56] evaluated 3 new MSF sites, [1:25:58] which we'll talk a little bit [1:26:00] more about it later. And then [1:26:01] overall, the project schedule [1:26:03] is once we complete the NEPA [1:26:04] process in fall, [1:26:06] we will start utility [1:26:07] relocation, [1:26:08] property acquisition in 2027. [1:26:09] Groundbreaking [1:26:11] for station and guideways in [1:26:14] 2029 and opening [1:26:15] for the project in about 10 [1:26:17] years. The project does have [1:26:18] many benefits, [1:26:19] reduced travel time from 16 [1:26:21] minutes by car down to 8 [1:26:23] minutes by rail, regardless [1:26:24] of traffic. Better quality [1:26:26] of life, less traffic, less [1:26:27] emissions, and then reduced [1:26:29] transportation costs for over [1:26:30] 75,000 individuals that are [1:26:32] transit dependent [1:26:34] in a study area. it generates [1:26:35] over $3.1 billion economic [1:26:37] benefits [1:26:38] in this region and then 11,000 [1:26:41] new jobs for the construction [1:26:42] and operation of the project. [1:26:44] During the NEPA phase, [1:26:45] we heard from the community the [1:26:47] 39-acre site in Montebello was [1:26:49] too large. It covers 500 [1:26:51] employees and 6 large [1:26:53] properties. [1:26:55] During NEPA phase, we tried [1:26:56] to look at ways [1:26:58] to reduce impact. We started [1:27:00] thinking about within the box [1:27:02] of 2 options, MS Site 1 and 2 [1:27:04] in Montebello, which shows [1:27:06] in yellow and green [1:27:08] on the map. And those are [1:27:09] smaller than 39 acres, 25 to [1:27:11] 29 acres. However, that's still [1:27:13] too big to the City of [1:27:14] Montebello. And we started [1:27:17] to think outside of the box. [1:27:18] What can we do? We look at the [1:27:20] properties that were already [1:27:21] identified in the final EIR [1:27:23] for tunnel boring activity, [1:27:25] and we're going [1:27:27] to use those 9-acre sites in [1:27:29] Commerce Twice [1:27:30] after construction [1:27:31] of tunnel boring [1:27:32] for the underground alignment [1:27:34] in Commerce, we're going [1:27:35] to use it [1:27:36] for a junior MSF site [1:27:37] in the city of Commerce. MSF [1:27:38] Site 3 is recommended because [1:27:40] it meets the operational [1:27:42] requirements, we need [1:27:43] for the IOS, reduce the number [1:27:45] of property acquisitions, [1:27:47] reduce the impact [1:27:48] to the community [1:27:49] without displacing 500 [1:27:51] employees in Montebello. It [1:27:53] also minimizes construction [1:27:54] impact along Washington [1:27:55] Boulevard. We conducted the [1:27:57] weighted benefits and cost [1:27:58] analysis also for the 3 [1:27:59] options, and all MSF sites are [1:28:01] viable, but MSF Site 3 [1:28:04] performed the best. As you can [1:28:06] see, we, across all 5 goals, [1:28:08] MSF Site 3 delivers similar [1:28:10] benefits from safety, health, [1:28:13] environmental sustainability, [1:28:15] and deliver economic benefits. [1:28:17] However, it, we could deliver [1:28:19] all the similar benefits [1:28:20] with much lower cost. Reduce [1:28:22] construction impact and [1:28:24] environmental impact [1:28:25] to our community. We have also [1:28:27] conducted very comprehensive [1:28:29] outreach, starting even prior [1:28:31] to entry into the NEPA phase [1:28:32] in early 2025. We hosted 4 [1:28:35] public meetings in East LA, [1:28:36] Montebello, Commerce, and also [1:28:38] virtually. We had 200 attendees [1:28:41] at those events. And throughout [1:28:43] the whole NEPA process, [1:28:44] we worked very closely [1:28:46] with our 14 community-based [1:28:47] organizations on this project. [1:28:49] to continue increasing [1:28:51] awareness for this project. We [1:28:53] made the environmental [1:28:55] assessment document available [1:28:56] online, which we had 1,300 [1:28:57] visits over 30 days. We have [1:29:00] hard copies available [1:29:01] at local libraries, [1:29:03] distributed 50,000 flyers [1:29:04] door-to-door [1:29:06] to our community station area, [1:29:08] transit intercepts, small [1:29:10] businesses, legal notices, [1:29:11] digital and physical flyers [1:29:14] through many, many channels. [1:29:15] And then we want to really [1:29:17] thank the board offices and the [1:29:18] cities and the Gateway Cities [1:29:20] Corps for helping us informing [1:29:21] the community [1:29:22] of this project. A little bit [1:29:24] about the finding from the [1:29:26] environmental assessment. The [1:29:27] LPA to Montebello has no [1:29:30] adverse environmental impact [1:29:32] that cannot be mitigated. It [1:29:34] has minimal impact [1:29:36] to historical resources, and [1:29:37] the impact that had been [1:29:38] identified in the EA can either [1:29:40] be avoided, minimized, [1:29:42] or mitigated [1:29:43] with the implementation of the [1:29:44] project. measures and the NEPA [1:29:46] mitigation measures. And as I [1:29:48] mentioned, [1:29:49] this project creates $3.1 [1:29:51] billion of benefits in terms [1:29:52] of economic condition. [1:29:54] Finally, what we heard [1:29:57] from the public in June during [1:30:00] the 30-day public review period [1:30:01] and the 4 public hearings in [1:30:03] East LA, Commerce, [1:30:04] Montebello, and virtually is [1:30:06] that we have received 140 total [1:30:09] comment submission letters, [1:30:10] which encompass over 350 [1:30:12] comments. These comments are [1:30:14] very, very similar [1:30:16] to what we have heard [1:30:18] from the previously, [1:30:19] the final EIR. It shows really [1:30:20] strong support [1:30:22] for the project, [1:30:23] for the extension to [1:30:24] Montebello and further [1:30:25] extension to Whittier. And [1:30:26] there's some common suggestions [1:30:28] about how we can work [1:30:29] with the cities and communities [1:30:30] on the design [1:30:31] of the alignment and the [1:30:33] station to ensure appropriate [1:30:34] traffic access and safety [1:30:36] during construction. and also [1:30:38] considering transit-oriented [1:30:40] development, community benefits [1:30:41] throughout the project [1:30:43] development process. So today [1:30:45] we are requesting your approval [1:30:47] and to receive and file [1:30:48] for the NEPA document, [1:30:49] select the MSF site in [1:30:51] Commerce, and also updating the [1:30:53] long-range plan. Upon your [1:30:55] approval for these actions, [1:30:56] we will work [1:30:58] with our lead agency FTA [1:30:59] to publish the NEPA document, [1:31:00] the findings of no significant [1:31:02] impact findings by fall 2026, [1:31:04] And we'll work with the, [1:31:08] our cities to continue engaging [1:31:09] the public throughout the [1:31:11] environmental process. I would [1:31:12] just really acknowledge FTA [1:31:14] Region 9 [1:31:16] for their expedited review [1:31:18] for this process, also their [1:31:19] partnership, [1:31:22] and also our borough offices [1:31:24] in terms of outreach support [1:31:25] during the NEPA phase. And [1:31:27] also, behind me and work [1:31:28] with me, 175 staff members [1:31:30] from Metro departments and our [1:31:32] consultant team, [1:31:33] including our SBE and DBE, [1:31:35] who worked really hard [1:31:36] for the outreach effort. [1:31:38] With that, I'm happy [1:31:39] to answer any questions. [1:31:41] >> Thank you [1:31:43] for that presentation. Do we [1:31:44] have any members [1:31:45] of the public who asked [1:31:46] to speak? [1:31:48] >> Yes, we do. I have item 12 [1:31:49] here. Patrick Lewis, please [1:31:50] come up to lectern A. Ashley [1:31:53] Lujan, please come up [1:31:54] to lectern B. Gabriella Eddy, [1:31:56] please come up to lectern A. [1:31:58] If you're on the phone, [1:31:59] please press pound 2. [1:32:02] >> Thank you. We're glad [1:32:03] to hear your voice today. [1:32:05] >> Good afternoon. My name is [1:32:06] Patrick Lewis, and I'm speaking [1:32:08] on behalf of the Gateway [1:32:09] Cities Council of [1:32:10] Governments. Today we voice our [1:32:11] support for the Eastside [1:32:13] Transit Corridor Phase 2 [1:32:14] project and the environmental [1:32:15] assessment [1:32:16] before the committee. This [1:32:18] project represents an important [1:32:19] step [1:32:20] toward expanding reliable, [1:32:21] high-quality transit service [1:32:22] throughout Southeast Los [1:32:24] Angeles County and the [1:32:25] Gateway Cities region. [1:32:26] Improved regional connectivity [1:32:28] will make it easier [1:32:29] for residents to reach jobs, [1:32:30] schools, medical facilities, [1:32:32] commercial areas, and other key [1:32:34] destinations while reducing [1:32:35] transportation barriers [1:32:36] for many communities. We urge [1:32:38] the committee to receive and [1:32:39] file the environmental [1:32:41] assessment, approve the [1:32:42] recommended maintenance and [1:32:44] storage facility site in [1:32:45] Commerce, and amend the [1:32:46] long-range transportation plan [1:32:48] to incorporate the [1:32:49] board-approved locally [1:32:50] preferred alternative. [1:32:52] Advancing these approvals will [1:32:53] bring the project closer to [1:32:54] implementation and help realize [1:32:55] long-term transportation, [1:32:57] economic, and quality [1:32:58] of life benefits [1:32:59] for our communities. Thank you. [1:33:00] >> Thank you. Next, please. [1:33:14] >> Good afternoon. My name is [1:33:16] Ashley Lujan. I represent the [1:33:17] Mexican American Opportunity [1:33:18] Foundation. As a grassroots [1:33:20] organization that provides [1:33:21] services to community members [1:33:23] throughout the East Side, [1:33:25] Commerce, Montebello, and [1:33:27] neighboring communities, we [1:33:30] witness firsthand how important [1:33:32] public reliable transportation [1:33:34] is to the people we serve. [1:33:36] This is why we support the [1:33:38] Eastside Corridor Transit [1:33:40] Corridor Phase 2 project. Many [1:33:43] of our community members rely [1:33:44] on transit every day to get [1:33:46] to work, go to school, [1:33:48] attend medical appointments, [1:33:50] and other essential [1:33:52] destinations. We encourage the [1:33:55] Metro Board [1:33:56] to continue advancing the [1:33:57] Eastside Transit Corridor [1:33:58] Phase 2 project so future [1:34:00] generations can benefit [1:34:01] from a stronger, [1:34:02] more connected system. [1:34:04] Expanded transport, expanding [1:34:06] transportation is not a luxury [1:34:08] but a crucial step to creating [1:34:09] greater opportunities [1:34:10] for families and neighborhoods. [1:34:12] Thank you. [1:34:13] >> Thank you. Next, please. [1:34:17] >> Can you hear me? [1:34:18] >> Thank you. Yes. [1:34:20] >> Good morning, Chair, [1:34:21] members. I'm Gabriela Eria, [1:34:22] community organizer [1:34:23] with SVCC representing today, [1:34:25] and we want [1:34:26] to express our strong support [1:34:28] for the Eastside Transit [1:34:29] Corridor Phase 2 project. [1:34:31] Every day we work with [1:34:33] residents and families [1:34:34] throughout our community who [1:34:35] rely on public transportation [1:34:37] to get to work, to school, to [1:34:39] medical appointments and [1:34:40] services they need. We know [1:34:42] that having reliable and [1:34:44] accessible transit is not just [1:34:45] about getting from one place [1:34:47] to another. It's [1:34:49] about creating opportunities, [1:34:50] reducing barriers, and helping [1:34:51] our communities stay connected. [1:34:53] I'm from Mexico City, so I know [1:34:55] about these things firsthand. [1:34:57] And expanding transit access [1:34:59] will help connect residents [1:35:01] to jobs, education, healthcare, [1:35:03] sports, and recreation. And we [1:35:06] also appreciate that Metro's [1:35:08] commitment engaged community [1:35:10] organizations like us and [1:35:11] residents throughout this [1:35:13] process, giving local voices [1:35:14] the opportunity [1:35:15] to be heard and [1:35:16] to help us that to project like [1:35:19] this reflects needs and [1:35:21] priorities of the community. [1:35:23] Thank you for your time, [1:35:24] and we support this. Go [1:35:26] Metro! [1:35:27] >> Go Metro! We have 2 people [1:35:29] from the phones. Please unmute [1:35:31] the first caller. [1:35:35] >> Caller ending in 9370, [1:35:37] please state your name. You [1:35:38] have 1 minute [1:35:39] to state your comment. [1:35:42] >> Hi, my name is Jacqueline. I [1:35:46] am a South Montebello resident, [1:35:49] and I decided to call [1:35:52] in because I'm in support [1:35:54] for the Metro Eastside [1:35:56] Extension all the way to [1:35:57] Montebello. I would get service [1:36:00] from the last train station, [1:36:03] which would be, at least [1:36:06] for this portion, the [1:36:07] Greenland and Washington. And I [1:36:09] am here in support because we [1:36:11] Don't have that many. We have [1:36:12] many. We have the Montebello [1:36:16] transit, but [1:36:18] at the same time, it's not as [1:36:20] like, [1:36:23] it's not as consistent as [1:36:26] Metro. And I feel like [1:36:28] with this Metro extension, we [1:36:29] would have much more reliable [1:36:30] service to get [1:36:31] to downtown LA or to get [1:36:32] to even closer places [1:36:33] like the Citadel, which is, [1:36:35] which was the station prior. [1:36:37] And I'm here [1:36:38] in support because I feel like [1:36:39] it would benefit our community [1:36:41] to have reliable [1:36:43] transportation, [1:36:45] to have reliable transportation [1:36:46] to downtown LA. [1:36:51] >> Moving on [1:36:52] to the next caller. [1:36:53] Caller ending in 3705, [1:36:54] please say your name. You have [1:36:56] 1 minute [1:36:57] to state your comment. [1:37:02] >> Good afternoon, [1:37:06] board members. My name is [1:37:07] Cesar Roldan, Director of [1:37:08] Public Works for the City of [1:37:09] Montebello. The city supports [1:37:11] Metro's continued advancements [1:37:13] of the Eastside Transit [1:37:15] Corridor Phase 2 project and [1:37:16] the environmental assessment [1:37:17] being presented today. [1:37:19] However, we respectfully [1:37:21] request that the board consider [1:37:22] relocating the proposed [1:37:23] maintenance and storage [1:37:24] facility to a more appropriate [1:37:26] site outside of the City of [1:37:27] Montebello. This project is an [1:37:28] important investment [1:37:30] in regional mobility. It will [1:37:32] expand access to jobs, [1:37:33] education, healthcare, [1:37:35] and other essential services [1:37:37] for residents in East Los [1:37:38] Angeles, Commerce, [1:37:40] Montebello, Pico, Santa Fe [1:37:41] Springs, Whittier, and the [1:37:42] surrounding communities. We [1:37:44] urge the committee to receive [1:37:45] and file the environmental [1:37:46] assessment, approve the [1:37:48] proposed maintenance storage [1:37:50] facility site in Commerce, and [1:37:51] amend the long-range [1:37:52] transportation plan to advance [1:37:53] the board-selected locally [1:37:55] preferred alternative. I want [1:37:56] to thank the board, and I want [1:37:59] to thank Metro staff [1:38:00] for working with the City of [1:38:01] Montebello. Thank you. [1:38:02] >> That was the last public [1:38:03] comment. [1:38:04] >> Thank you. Supervisor [1:38:05] Solis. [1:38:08] >> Yes, thank you, Madam [1:38:09] Chair. I especially want [1:38:11] to thank the staff. I want [1:38:15] to thank you, Ray, and your [1:38:16] team Jill, Lou, especially [1:38:17] Lillian De Losa Gutierrez, [1:38:19] Lorena Sanchez, Dolores [1:38:21] Roibal, Annette Cortez, and I [1:38:23] especially want [1:38:25] to thank our CEO, Stephanie [1:38:27] Wiggins, and everyone, because [1:38:29] when you mentioned earlier this [1:38:31] has been a 19-year project, [1:38:32] I had to shake my head. I [1:38:34] haven't even been here 12 yet, [1:38:35] and look at, I mean, [1:38:37] people have been on this, [1:38:39] and it took mountains, [1:38:41] moving mountains. And I want to [1:38:43] say that you have not let us [1:38:45] down, Metro, and the community [1:38:47] has not let us down. And it is [1:38:49] important because this, [1:38:51] for me, is one [1:38:53] of the biggest legacy projects [1:38:55] for the East Side. And we're [1:38:56] finally going [1:38:57] to see some pathway forward. [1:38:59] And given all the challenges [1:39:00] and hardships, to come [1:39:02] to this day, [1:39:03] to see that we're going [1:39:04] to submit our NEPA, go [1:39:06] through the NEPA process, [1:39:07] and we've had our hearings, and [1:39:09] we've done tremendous outreach. [1:39:11] So I want to commend you for [1:39:12] that because I know this was [1:39:13] not easy. And including [1:39:15] figuring [1:39:17] out where we were going [1:39:18] to put the maintenance yard, [1:39:19] going back and forth with [1:39:20] Montebello and Commerce. And [1:39:22] the person who called earlier, [1:39:24] we're looking at Commerce. So [1:39:25] just [1:39:26] to clear the record there and [1:39:27] to let you know that now [1:39:29] because of this process, [1:39:30] we'll be able to move into the [1:39:32] other step forward now that'll [1:39:33] open up the capital investment [1:39:36] grant program so we can receive [1:39:38] more funding. And I'm just I'm [1:39:40] just overwhelmed. I can't [1:39:41] believe that today has finally [1:39:44] come for me, at least sitting [1:39:46] here knowing that all things [1:39:47] were coming together. Because [1:39:49] last year or 6 months ago, I [1:39:52] was very fearful that things [1:39:53] were not going [1:39:54] to go this way, [1:39:56] that they were going to go [1:39:57] in another direction. But I'm [1:39:58] very happy that the wisdom [1:40:00] of your committee, this [1:40:01] committee, and your staff, [1:40:04] as well as the community coming [1:40:05] out to support. And I want [1:40:07] to thank my staff too, Wakas, [1:40:09] Raymond, and others that have [1:40:10] been involved in this process [1:40:11] for many years. What a [1:40:13] tremendous opportunity is [1:40:15] for all of us. And I would just [1:40:17] ask us to continue to do the [1:40:19] outreach so people are fully [1:40:20] aware that we have our eyes and [1:40:22] our ears focused here, [1:40:25] and that this is going to be a [1:40:26] very beneficial project [1:40:28] economically for people who are [1:40:30] so transit-dependent [1:40:32] on the bus right now, and [1:40:34] to see them making progress, [1:40:35] economic development, [1:40:37] and just the creation [1:40:39] of jobs, all of that is going [1:40:41] to be so meaningful [1:40:42] for this space, for East LA, [1:40:43] which has gone [1:40:44] through a whole lot, as many [1:40:46] of you know, in the last 3 [1:40:48] weeks. So, thank you so much, [1:40:50] and I want to congratulate the [1:40:51] planning team and again our [1:40:53] CEO. Thank you. [1:40:56] >> I love the confidence [1:40:57] already being expressed and [1:40:59] this project. Director [1:41:01] Najarian. [1:41:04] >> Well, I have another story [1:41:05] to tell. [1:41:06] >> We're ready, we're ready, [1:41:07] we're ready. [1:41:09] >> It was almost 17 years ago, [1:41:12] it was November of 2009, that [1:41:15] I, [1:41:16] as a freshly minted chairman [1:41:18] of this august agency, [1:41:22] was there and able [1:41:23] to officiate at the [1:41:26] ribbon-cutting and the [1:41:27] dedication of the East Side, [1:41:30] they called it the Gold Line [1:41:31] back then. Phase 1. And it was [1:41:34] attended by all the incredible [1:41:37] community leaders, Gloria [1:41:38] Molina, Representative Lucille [1:41:41] Roybal-Allard, the mayor was [1:41:45] Antonio Villaraigosa, and [1:41:47] everyone was there. And I have [1:41:49] to tell you, [1:41:50] it was such a proud moment [1:41:52] for East LA at that time, [1:41:54] because up until then, they [1:41:55] really felt that they were [1:41:57] being ignored [1:41:58] in the transit allocation. [1:42:01] The West Side had all their, [1:42:03] the Red Line was already going, [1:42:04] the Purple Line was going, and [1:42:07] this was something that really [1:42:09] brought some identity and some [1:42:11] pride [1:42:12] to the entire community. [1:42:15] Supervisor, you were probably [1:42:16] in Washington, and you probably [1:42:17] heard all the good news and [1:42:19] everything that was that was [1:42:21] going on at that time. And then [1:42:23] let's move forward a little [1:42:25] bit. I can't, I mean, [1:42:27] I can't overstate the amount of [1:42:29] controversy that we were facing [1:42:31] trying to decide which [1:42:33] alignment was going [1:42:34] to be used. Is it going [1:42:36] to be the SR 60, or is it going [1:42:38] to be the Washington [1:42:40] Boulevard? And all the heavy [1:42:42] hitters were out there trying [1:42:43] to lobby the board. Richard [1:42:45] Alatorre, A big proponent [1:42:48] of the SR-60. Mike Ruse and all [1:42:50] these other folks were coming [1:42:53] in and lobbying. And I think it [1:42:54] was a contamination discovery [1:43:00] on the SR-60 route that really [1:43:02] shifted everyone back to [1:43:03] Washington. And I'm so happy [1:43:05] that we're here today approving [1:43:07] the NEPA, moving forward. It's [1:43:09] something that the East Side [1:43:11] desperately deserves and is [1:43:13] entitled to. Thank you. [1:43:15] Especially since we've had all [1:43:16] the excitement [1:43:17] on the west side, right? We've [1:43:18] got the K Line and the, the C [1:43:20] Line and the D Line and all [1:43:22] that stuff. This is something [1:43:23] that's truly deserved and [1:43:25] equitable. And if nothing else, [1:43:27] this board tries to be [1:43:28] equitable. I think there's [1:43:30] still some allocations that [1:43:32] need to be made [1:43:33] to the east side [1:43:34] of the county, [1:43:36] but certainly this is a step [1:43:38] in the right direction. So I [1:43:39] wholeheartedly support this. [1:43:43] >> Well, thank you [1:43:44] for sharing that. Really, [1:43:45] really important. But I do, [1:43:46] I want to just add kudos [1:43:49] to you for the outreach. It's [1:43:54] such an outstanding notation of [1:43:58] how the community has been [1:44:00] engaged. And actually, the only [1:44:01] public comment today has been [1:44:02] on this item, [1:44:04] so it continues. And kudos [1:44:05] to you. Thank you. Thank you so [1:44:07] much, Madam Clerk. I'm going [1:44:09] to have a motion, [1:44:10] please. I know Mr. Najarian is [1:44:15] going to second it. [1:44:16] >> Vice Chair Solis? [1:44:18] >> Yes. [1:44:20] >> [ SPANISH ]. [1:44:21] >> Director Mitchell? [1:44:22] >> Aye. [1:44:23] >> Director Najarian? [1:44:24] >> Aye. [1:44:25] >> Director Horvath? [1:44:26] >> Aye. [1:44:27] >> And Chair Dupont-Walker? [1:44:29] >> [ SPANISH ]. [1:44:30] >> The motion carries. [1:44:32] >> Thank you. Thank you so [1:44:34] much. We are now at item 13, [1:44:40] Open and Slow Streets Grant [1:44:41] Program update. [1:44:45] >> Thank you, Chair. Joining me [1:44:46] at the table is Jacob Lieb, [1:44:48] Deputy Executive Officer, and [1:44:50] Neha Chawla, Senior Director, [1:44:52] who will go [1:44:54] through the presentation. [1:45:00] >> Thank you. [1:45:02] >> Good afternoon. We will be [1:45:03] presenting the Open and Slow [1:45:04] Streets grant update [1:45:06] for your consideration. The [1:45:07] staff recommendation is [1:45:09] to provide assistance [1:45:10] to local jurisdictions [1:45:11] to use local return and [1:45:12] Transportation Development [1:45:13] Act, or TDA, Article 3 as the [1:45:15] only available funding for [1:45:17] Open and Slow Streets events [1:45:19] occurring between September [1:45:21] 2026 and March 2028. The [1:45:24] Metro Board approved cycles 6 [1:45:27] and 7 of the program in [1:45:29] December 2026, 2025. The action [1:45:32] included an amendment [1:45:34] to report back on a series of [1:45:35] recommendations and analysis, [1:45:37] to obtain input [1:45:38] from community stakeholders [1:45:40] to identify ways [1:45:41] to make the program permanent, [1:45:43] initiate an abbreviated cycle [1:45:44] with identified funding [1:45:45] for events occurring between [1:45:47] September 2026 and March [1:45:49] 2028, and offer technical [1:45:51] assistance, [1:45:52] including alternative sources [1:45:53] of funding [1:45:54] for events not funded [1:45:55] through cycles 6 and 7. [1:45:58] >> Thank you, Neha. Good [1:45:59] afternoon, Madam Chair, members [1:46:01] of the committee. I will talk [1:46:03] you through the staff response [1:46:06] to direction from the board [1:46:07] from back in January, as Neha [1:46:09] described. This is [1:46:10] substantially described [1:46:12] within the board report itself, [1:46:13] but I'll be describing some [1:46:16] of the high points [1:46:17] of our staff response. [1:46:20] For the first item, [1:46:21] which directed us to come back [1:46:22] with recommendations [1:46:24] for a permanent Open and Slow [1:46:25] Streets program, what we're [1:46:27] describing is that staff [1:46:29] intends to return to the board [1:46:30] in 2028 with recommendations [1:46:32] for a permanent program. A [1:46:34] couple of things that we want [1:46:36] to emphasize here. First [1:46:38] of all, [1:46:40] that the currently awarded [1:46:42] Cycle 6 and 7 Open and Slow [1:46:44] Streets events, [1:46:45] and I'd say unlike prior cycles [1:46:47] of the grant program, we have [1:46:50] retained the program evaluation [1:46:51] activities, whereas in the past [1:46:53] we've asked our grantees [1:46:54] to evaluate individual events. [1:46:57] That evaluation is ongoing [1:46:58] with the current slate [1:47:00] of events, will continue [1:47:01] with the 2028 Open and Slow [1:47:03] Streets events, [1:47:05] and that will provide us [1:47:06] with a depth of information to [1:47:08] inform that recommendation that [1:47:12] we'll be bringing back to you. [1:47:14] in 2028. The other thing [1:47:15] to emphasize is that we do [1:47:17] within this Board report [1:47:19] describe some guideposts or [1:47:20] considerations [1:47:22] for a permanent program, [1:47:24] and we felt it was important to [1:47:25] inform you and get your [1:47:26] feedback as our Board, as well [1:47:28] as to provide an indication [1:47:30] to stakeholders and partners [1:47:31] about how we want [1:47:33] to pursue that discussion [1:47:34] over the next couple [1:47:35] of years. And it features [1:47:37] things like a closer tie [1:47:39] to specific intended outcomes, [1:47:41] such as improving transit [1:47:43] ridership, both on day of event [1:47:46] and measuring the impact that [1:47:47] open and slow streets events [1:47:49] have on everyday choices [1:47:52] to ride transit. Additional [1:47:55] outcomes that we are featuring [1:47:59] include creating some distinct [1:48:02] and measurable momentum [1:48:03] toward the implementation of [1:48:05] permanent active transportation [1:48:06] infrastructure, [1:48:09] and then as well moving [1:48:12] toward a more regular, [1:48:13] predictable cadence of open and [1:48:16] slow streets events, as we see [1:48:17] with some of the most popular [1:48:18] and successful and long-running [1:48:21] open street and slow streets [1:48:22] programs around the world. All [1:48:24] of those objectives that we [1:48:26] described in the board report [1:48:27] are also underpinned [1:48:29] by a key consideration, [1:48:30] which is cost efficiency. What [1:48:32] we've observed, [1:48:34] and specifically recently [1:48:35] with the program, [1:48:37] are dramatically increasing [1:48:39] costs, [1:48:40] and everything else that we [1:48:41] want to accomplish [1:48:42] with this program requires us [1:48:44] to deliver these events as [1:48:46] efficiently as possible [1:48:48] with our partners. The second [1:48:50] item that the Board asked us [1:48:51] to come back [1:48:52] with recommendations [1:48:54] on is funding [1:48:55] for an abbreviated cycle and [1:48:56] to identify $1 million [1:48:58] for that purpose. What we have [1:49:01] described in the board report [1:49:03] is that there is both broadly [1:49:06] eligible, very flexible, [1:49:08] and available funding in [1:49:10] locally programmed fund [1:49:12] sources, including [1:49:13] Transportation Development [1:49:15] Act Article 3, as well as local [1:49:16] return. We've provided as [1:49:19] attachments to the board [1:49:20] reports the current fund [1:49:22] balances for both of those [1:49:24] Funding sources. We've also [1:49:26] described that [1:49:29] for all prior cycles of the [1:49:33] Open and Slow Street programs [1:49:35] we have tapped on Proposition C [1:49:38] 25%, PC 25, as the only [1:49:41] eligible Metro, directly [1:49:44] Metro-programmed funding source [1:49:47] for programming events like [1:49:48] Open and Slow Streets. The [1:49:50] PC-25 funding source for this [1:49:54] time period is fully subscribed [1:49:58] to high-priority investments [1:50:01] such as the Vermont Transit [1:50:03] Corridor, the freeway service [1:50:05] patrol other items that, [1:50:07] that we've described [1:50:08] within the board report. And, [1:50:10] and we do not want to be [1:50:11] in a position [1:50:12] of creating a funding hole [1:50:13] within those other priorities [1:50:15] and, and then having [1:50:16] to come back to you [1:50:17] with recommendations for how [1:50:19] those funding holes might be [1:50:21] plugged. And then the final [1:50:23] item that the board asked us [1:50:24] to report back on is technical [1:50:25] assistance. I want [1:50:27] to emphasize here, of course, [1:50:28] that we provide technical [1:50:29] assistance to grantees and [1:50:30] prospective grantees routinely. [1:50:32] We've done that as part [1:50:35] of the cycle 6 and 7 debrief, [1:50:37] both with successful and [1:50:39] unsuccessful applicants. And we [1:50:42] will be, [1:50:45] pending the board's action [1:50:47] on this item, we will be [1:50:48] initiating an intensive [1:50:50] technical assistance effort [1:50:51] to assist jurisdictions with [1:50:54] accessing the available [1:50:56] funding, navigating trade-offs, [1:50:58] providing grant writing [1:51:00] assistance in instances where [1:51:02] that's appropriate, [1:51:03] and so forth. Open and Slow [1:51:06] Streets program, of course, is [1:51:08] an equity-focused effort that's [1:51:10] reflected in our grant [1:51:14] selection criteria, where in [1:51:17] fact these events are taking [1:51:18] place. As noted on slide 25, [1:51:20] of the current 29 funded events [1:51:22] are [1:51:23] in equity-focused communities, [1:51:25] and filters through with how [1:51:27] the events are produced and [1:51:29] mounted. Many of the events are [1:51:30] themselves produced by [1:51:32] community-based organizations, [1:51:34] and all of the events place a [1:51:35] great emphasis on making sure [1:51:38] that the full range of Los [1:51:41] Angeles residents have access [1:51:43] to events and are enjoying [1:51:46] them. Next steps as described, [1:51:49] we will be continuing [1:51:51] to evaluate the current slate [1:51:53] of funded program events [1:51:55] in cycles 6 and 7. returning [1:51:58] to you in 2028 [1:52:00] with recommendations tied to [1:52:02] Cycle 8 and an ongoing [1:52:04] permanent program as directed [1:52:07] by the board. That concludes [1:52:09] our presentation. [1:52:10] >> Thank you very much. Do we [1:52:11] have any public comments? [1:52:13] >> If you'd like [1:52:14] to make a comment on item 13, [1:52:17] Open and Slow Streets Grant [1:52:19] Program Update, please press [1:52:21] pound 2 to raise your hand. [1:52:22] From the room, we have Rommel [1:52:24] Ramel Pasqual, please come [1:52:27] to podium lectern A, and Wes [1:52:29] Ruttenman, please come [1:52:31] to lectern B. [1:52:37] >> Good morning, [1:52:38] directors. I'm Ramel Pasqual. [1:52:39] I'm the executive director of [1:52:41] CicLAvia. Let me just begin by, [1:52:43] Metro has been an outstanding [1:52:45] partner in making Open Streets [1:52:46] one of the region's greatest [1:52:48] success stories. These events [1:52:49] have consistently delivered [1:52:50] benefits, increasing transit [1:52:53] ridership, supporting local [1:52:54] business, improving public [1:52:56] health, encouraging active [1:52:58] transportation, and most [1:52:59] importantly, [1:53:00] bringing communities together. [1:53:02] That's why today's report is so [1:53:03] disappointing. It arrives [1:53:05] months late. No permanent [1:53:08] program developed, [1:53:10] no funding allocated [1:53:13] for events in 2027. No [1:53:14] commitments [1:53:16] to longer multi-route, [1:53:18] multi-mile routes that have [1:53:20] made Open Streets so [1:53:21] successful. And I want [1:53:22] to be clear on this, is we [1:53:24] would have welcomed being [1:53:25] engaged as a report was being [1:53:27] developed. As the region's [1:53:29] longest-running and most [1:53:31] experienced Open Streets [1:53:32] organization, we believe our [1:53:34] experience could have helped [1:53:35] strengthen its recommendations. [1:53:38] As we move forward, [1:53:39] I'm asking the board to make [1:53:42] Open Streets permanent. Thank [1:53:43] you. [1:53:45] >> Thank you. Next, please. [1:53:46] >> Good morning, directors. [1:53:50] Wes Ruderman, Deputy Director [1:53:51] with active SGV. [1:53:52] Over the past decade, [1:53:56] we we've had the pleasure [1:53:57] of hosting 10 events in the [1:53:58] San Gabriel Valley made [1:54:00] possible by Metro. Our region [1:54:02] is filled [1:54:03] with small communities, and [1:54:04] these cities generally do not [1:54:05] have the staff capacity or the [1:54:07] discretionary funding [1:54:08] to host large regional events [1:54:10] like this. However, thanks to [1:54:12] Metro's program, [1:54:13] we've been able [1:54:16] to do really iconic events, [1:54:17] some of the biggest events [1:54:18] in the San Gabriel Valley. [1:54:19] For example, [1:54:20] our first one connected 6 new [1:54:22] Gold Line cities all the way [1:54:24] from Azusa to South Pasadena. [1:54:26] It was 8 communities together, [1:54:28] 18 miles of open streets. [1:54:29] There was even a point-to-point [1:54:30] half marathon. People were able [1:54:31] to run, get a TAP card, [1:54:33] and take the train back. And [1:54:35] again, things like events [1:54:36] like that, or Arroyo Fest, when [1:54:38] the Arroyo Seco Parkway was [1:54:40] reopened, only possible with [1:54:41] Metro's leadership and support. [1:54:43] And unfortunately, [1:54:45] our region will not be able [1:54:46] to do events like this if there [1:54:47] isn't a strong partner at [1:54:49] Metro and a Metro program. [1:54:51] Thank you. [1:54:52] >> That was the last public [1:54:53] comment. [1:54:54] >> Okay, thank you. I hear the [1:54:57] public comment. I'm also struck [1:55:00] by the staff report, which [1:55:02] indicates that this is the only [1:55:06] available pot of money for this [1:55:08] use. I remember joining this [1:55:10] board, [1:55:12] and we were actually looking [1:55:15] at these kinds of activities as [1:55:17] being very much out-of-the-box [1:55:19] thinking. We've come a long way [1:55:20] but I must say I would be very, [1:55:23] very concerned if we put any [1:55:28] of our projects at risk [1:55:30] by doing this. So, we must find [1:55:31] a way [1:55:32] to be out-of-the-box thinkers [1:55:34] at the same time that we don't [1:55:35] forget our core focus. I am [1:55:38] very concerned if anything [1:55:40] would threaten the Vermont [1:55:41] Corridor. I am struck [1:55:43] by the continued memory [1:55:47] of a video that talked [1:55:48] about the last train, red car, [1:55:51] that went in. It was Vermont, [1:55:54] and it was promised that it [1:55:55] would return. And we start [1:55:56] with the BRT. [1:55:58] And so, I hope we can, [1:55:59] I know you will because you're [1:56:01] creative, continue to look. [1:56:03] And thank you for that. And I'm [1:56:04] sure none of us would want [1:56:05] to put [1:56:07] at risk a legacy project [1:56:08] like the Vermont Corridor BRT. [1:56:09] Thank you. Supervisor [1:56:12] Horvath. [1:56:14] >> Thank you, Madam Chair. I, [1:56:15] I just want to echo the [1:56:18] sentiments that were expressed [1:56:19] by members of the public. And [1:56:21] given the hour we're at, I, I [1:56:23] know we have a couple more [1:56:24] items and I probably need [1:56:25] to wrap up soon. I just wanted [1:56:26] to ask my colleagues to [1:56:27] consider potentially moving [1:56:29] this item for full board [1:56:31] consideration. I know there are [1:56:33] other members of the board who [1:56:34] also have a passion [1:56:36] for these programs, [1:56:37] and I too am disappointed, [1:56:40] not only what it says [1:56:43] about our investment [1:56:44] in this kind of programming, [1:56:45] but with a 4-month delay, even [1:56:47] if we did stand up something [1:56:49] alternatively, [1:56:50] it takes away the opportunity [1:56:51] for people to apply and go [1:56:52] through the process that's [1:56:53] necessary. The intention [1:56:55] behind this wasn't simply to [1:56:56] provide technical assistance. [1:56:58] It was to look at how we could [1:57:02] make a program permanent. And I [1:57:05] agree with the Chair that we [1:57:06] have to be mindful [1:57:08] of what our finances are. And [1:57:09] unfortunately, the pot of money [1:57:11] that was identified is not a [1:57:13] pot of money that we actually [1:57:14] have discretion over. And so, I [1:57:15] think that given the challenges [1:57:20] of what has been presented [1:57:22] to us and sort of the lateness [1:57:24] of where we are [1:57:25] in our committee meeting [1:57:27] at this point in time, [1:57:29] I think there's a lot [1:57:31] to discuss [1:57:32] about what would be possible [1:57:34] for us to do at this point. I [1:57:37] think a major motivation [1:57:39] for us [1:57:40] to consider this was not only [1:57:42] to create a long-term permanent [1:57:43] program, which I think is a [1:57:45] priority, but also [1:57:46] to identify opportunities [1:57:48] between the World Cup and the [1:57:50] Olympics and keep sort of the [1:57:52] energy going as it relates [1:57:54] to open streets and the kind [1:57:55] of activity that it can bring, [1:57:57] the kind of engagement [1:57:58] opportunities that it gives [1:58:00] Metro for, to engage people who [1:58:02] are interested in all of the [1:58:03] solutions that we're bringing [1:58:05] forward to communities. So, I [1:58:06] would just offer that perhaps [1:58:07] we could forward this [1:58:09] to the full board for [1:58:10] consideration without [1:58:11] recommendation today. [1:58:14] >> I think that our full Board [1:58:17] has a lot of items [1:58:18] on it because we were dark in [1:58:21] June. So, if this committee [1:58:23] would want to vote today, [1:58:24] it doesn't close the issue out, [1:58:26] but I think it's important [1:58:28] for us, given what I've seen [1:58:30] already and been advised we [1:58:32] might have before us [1:58:35] in the meeting next week. If we [1:58:37] could move this item today, [1:58:38] it would be very helpful. [1:58:40] Thank you. But let me hear [1:58:41] from the rest [1:58:42] of the committee. [1:58:47] >> My note says this was a [1:58:49] receive and file. Is that not [1:58:51] the action? [1:58:54] >> You're right, it is. It is a [1:58:55] receive and file. [1:58:56] >> No, it's not. It's not. [1:58:57] It's an action [1:58:58] to be taken. [1:59:00] >> So, our notes are wrong. [1:59:01] Okay. [1:59:03] >> Thank you very much, Madam [1:59:05] Chair. Let me say, I have [1:59:13] thoroughly enjoyed partnering [1:59:16] with some of the Open and [1:59:17] Slow Streets partners. [1:59:19] CicLAvia specifically partnered [1:59:22] and brought, helped to bring [1:59:24] CicLAvia to South LA. It's just [1:59:26] partnered with Metro on the [1:59:28] Paseo Willowbrook Open Street [1:59:29] event just 4th of July. And [1:59:32] when I consider You know, [1:59:34] what I hear [1:59:35] from constituents when we bring [1:59:36] CicLAvia, coupled [1:59:39] with the fact that the 2nd [1:59:40] Supervisory District, [1:59:42] in my other day job, [1:59:43] when we look at the Vision [1:59:45] Zero project that the county [1:59:46] voted on years ago, I am clear [1:59:49] that it's the 2nd district that [1:59:51] has the highest rate of vehicle [1:59:53] pedestrian fatalities. And so [1:59:56] Open and Slow Streets is a [1:59:58] wonderful program [2:00:00] to bring those communities [2:00:01] to create a safe opportunity [2:00:04] for community members [2:00:06] to try transit, [2:00:07] to walk and bike [2:00:09] in their own communities. And [2:00:12] so, I've supported. The reason [2:00:15] I chuckled is, [2:00:17] these are the kinds of [2:00:18] decisions that make our jobs [2:00:19] very difficult when it's [2:00:21] Sophie's Choice, if you will. [2:00:25] As Director Najarian talked [2:00:26] about this last item, [2:00:27] we just heard how it took 19 [2:00:29] years and how there was real [2:00:31] concern for many of those years [2:00:33] that there were certain aspects [2:00:34] of the community that had [2:00:36] expansion of transit and other [2:00:38] aspects that didn't. In reading [2:00:42] the report and the funding [2:00:44] source that would have [2:00:46] to be tapped is a community, [2:00:48] the Vermont Transit Corridor, [2:00:50] that currently sees close to [2:00:52] 40,000 Angelenos a day. [2:01:00] >> As we talked a moment ago [2:01:02] about how you're going [2:01:05] to define the, under the equity [2:01:08] rubric acknowledging that [2:01:14] 40,000 people per day [2:01:16] conservatively rely [2:01:19] on our presence [2:01:20] on that corridor [2:01:24] to live their lives. And so, if [2:01:26] that is the only viable funding [2:01:29] source, it's, [2:01:32] it's a non-negotiable for [2:01:34] someone who represents that [2:01:36] district and hears [2:01:38] from those people every day [2:01:41] about what that BRT means [2:01:44] to them, their ability to go [2:01:46] to work, to go to school, [2:01:48] to go to not just work but [2:01:50] to multiple jobs. And so that [2:01:55] is challenging for me. I'm not [2:01:57] really clear what a delay [2:01:59] in a vote would get us. [2:02:02] Director Horvath, you've hit [2:02:04] your button, [2:02:05] you must have an answer. [2:02:06] >> More opportunity for [2:02:07] engagement and discussion. I do [2:02:09] not believe that the Vermont [2:02:10] Corridor bucket [2:02:11] of money is the only source [2:02:13] of funding. CMAC, CBG. There [2:02:16] are other sources that we could [2:02:17] consider. And again, [2:02:19] given the lateness [2:02:20] of where we are, I think that [2:02:22] just deserves discussion. If [2:02:23] we're interested [2:02:24] in funding this, [2:02:26] I don't think the Sophie's [2:02:28] Choice that you reference is [2:02:30] appropriate or fair. But I [2:02:32] don't think it's the only [2:02:33] option that we have [2:02:35] to consider. And I think we [2:02:36] could, if there's willingness [2:02:37] of the board to continue [2:02:39] to fund this, that we could [2:02:40] have a more robust discussion [2:02:41] around what we would want to [2:02:43] fund and where we would fund it [2:02:44] from. [2:02:46] >> And so, is staff prepared [2:02:47] to talk about those other [2:02:48] funding sources and [2:02:50] opportunities today? [2:02:53] >> We appreciate the question. [2:02:55] We are, we are not prepared [2:02:57] to talk about, [2:03:00] >> Good afternoon, Michelle [2:03:01] Navarro, interim CFO. [2:03:04] Unfortunately, we do have very [2:03:06] limited sources [2:03:07] of eligible money [2:03:08] for these type [2:03:10] of projects and programs. The [2:03:12] only other source of funding [2:03:14] would be operating eligible [2:03:15] dollars, [2:03:17] which we are being very prudent [2:03:19] in under, in, [2:03:20] in protecting those dollars [2:03:22] for our operations. [2:03:23] >> We do have fiscal challenges [2:03:25] ahead, and we are trying to [2:03:27] protect those dollars as much [2:03:28] as possible. [2:03:32] >> I have a question, [2:03:33] but answer, Supervisor Mitchell? [2:03:38] >> It has. [2:03:39] >> Okay. [2:03:40] >> Thank you. [2:03:41] >> Any other comments? I think [2:03:43] given where we are, [2:03:45] I would ask for a motion. [2:03:49] >> I would move that we advance [2:03:52] this item [2:03:53] without recommendation [2:03:54] to the full board for full [2:03:55] board consideration. [2:04:03] >> The motion fails for lack [2:04:04] of a second. Could I have a [2:04:06] motion [2:04:07] to move it forward? [2:04:09] >> So moved. [2:04:12] >> Second. [2:04:14] >> Moved and seconded that we [2:04:16] move the items accepting the [2:04:18] staff recommendation. Will you [2:04:20] please call the roll? [2:04:21] >> Vice Chair Solis? [2:04:23] >> Aye. [2:04:24] >> Director Mitchell? [2:04:25] >> Aye. [2:04:26] >> Director Najarian? [2:04:27] >> Aye. [2:04:28] >> Director Horvath? [2:04:30] >> No. [2:04:31] >> And Chair Dupont-Walker? [2:04:32] >> Aye. [2:04:33] >> The motion carries. [2:04:35] >> But if I might add, I don't [2:04:37] think this forecloses the [2:04:38] efforts [2:04:39] to find other funding pools, [2:04:40] both [2:04:42] on the funding side and also [2:04:44] on the cost containment side in [2:04:46] the preparation and production [2:04:48] of these CicLAvias. So. [2:04:50] >> I think we all agree. Yeah, I [2:04:53] think we all agree. I think [2:04:55] what's important is there are [2:04:57] communities who have not [2:04:59] enjoyed the benefits. You've [2:05:00] talked about that today, [2:05:01] and I think we need to make [2:05:03] sure that they understand it's [2:05:04] still a priority for us. Item [2:05:09] 15, Countywide Planning Major [2:05:10] Project Status Report. Oh, I'm [2:05:13] sorry, did I skip 14? Yes, I [2:05:19] skipped 14. Thank you, [2:05:22] Supervisor Horvath. [2:05:24] Transportation Demand [2:05:25] Management Master Plan and [2:05:27] Policies. [2:05:29] >> Thank you, Chair. This item [2:05:32] is a receive and file [2:05:34] on the master plan. We can go [2:05:36] through an expedited [2:05:38] presentation considering the [2:05:40] time, if that may be the wish [2:05:42] of the Chair. [2:05:43] >> Yes. [2:05:47] >> Good morning. We are here [2:05:48] to present the TDM Master Plan [2:05:50] and policies. This is part [2:05:55] of the pre-games trip reduc, [2:05:57] or VMT reduction goal for the [2:05:59] Olympics. Next slide. We are [2:06:02] recommending [2:06:04] to receive and file the report [2:06:05] on implementation of the [2:06:06] Metro Transportation Demand [2:06:07] Management Master Plan Yes, [2:06:12] ma'am. So staff have developed [2:06:13] a Transportation Demand [2:06:14] Management Master Plan and [2:06:18] policies to address demand [2:06:19] in the Greater Los Angeles [2:06:20] region and [2:06:21] to provide a TDM roadmap [2:06:22] to support the 2028 Olympic and [2:06:24] Paralympic Games, as indicated [2:06:26] in the 2028 Mobility Concept [2:06:28] Plan. The goal of implementing [2:06:29] the master plan and policies is [2:06:31] to reduce VMT in Los Angeles [2:06:33] County by 20%. Before the 2028 [2:06:38] games, as established [2:06:39] by SCAG and LA 28. And I will [2:06:41] mention that this is just one [2:06:43] of the measures that will help [2:06:46] meet that 20% reduction goal. [2:06:49] The elements of the TDM master [2:06:51] plan are transit corridors and [2:06:53] mobility hubs. We want [2:06:54] to engage with communities [2:06:55] around planned mobility hubs [2:06:57] and transit lines to increase [2:06:58] transit use as well as [2:06:59] multimodal trips. Really [2:07:01] concentrating on those short [2:07:03] non-commute trips, [2:07:05] so those leisure trips, [2:07:07] errands, trips to school, and [2:07:09] promoting transit corridors and [2:07:11] mobility hubs as real assets [2:07:13] to the community. We also have [2:07:15] on-demand shared mobility [2:07:17] engaging residents in areas [2:07:19] with limited transit access by [2:07:20] offering incentivized on-demand [2:07:22] carpooling as a less expensive [2:07:24] option to driving alone. So [2:07:26] This would be similar to [2:07:28] Uber, but it would be a carpool [2:07:29] model where users could find [2:07:31] carpools [2:07:32] in a dynamic situation. Also, [2:07:34] I'd like to point [2:07:37] out that this is great for [2:07:38] employers who have shift [2:07:40] workers who don't have regular [2:07:41] schedules, and it's also great [2:07:43] for our transit-dependent folks [2:07:45] to have an additional mode of [2:07:47] mobility because you don't need [2:07:48] to own a car in order [2:07:49] to participate. You can just [2:07:51] simply be a rider. The next is [2:07:53] fostering multimodal kids [2:07:54] for the future. So it's going [2:07:56] into schools near the transit [2:07:58] corridors and mobility hubs and [2:07:59] engaging the kids and the [2:08:01] parents through the kids [2:08:03] in learning about walking, [2:08:04] biking, and transit, not only [2:08:07] to create future generations [2:08:08] that embrace multimodal travel, [2:08:10] but also to get to the parents [2:08:12] and get the parents taking [2:08:14] their kids on transit [2:08:16] at a young age. And finally, [2:08:18] we have transit tourism. [2:08:20] Promoting transit-accessible [2:08:21] destinations [2:08:22] to tourists as well as [2:08:23] residents [2:08:24] to reduce vehicle demand. [2:08:25] We'll do this [2:08:26] through partnering [2:08:28] with hotels, [2:08:29] training concierge on Metro's [2:08:31] programs, and also [2:08:34] through reaching out to our [2:08:36] residents and engaging them [2:08:38] to take transit [2:08:39] to leisure destinations. The [2:08:40] total budget [2:08:41] for this program is $11.295 [2:08:44] million, funded by a $10 [2:08:45] million CMAQ grant. [2:08:49] To support implementation [2:08:50] of the TDM Master Plan and [2:08:51] policies for the 2028 Games, [2:08:53] Metro will partner with SCAG, [2:08:54] which is coordinating the TDM [2:08:56] subcommittee of the Games [2:08:57] Mobility Concept Plan. Metro [2:08:59] will initially implement the [2:09:01] TDM Master Plan and policies as [2:09:03] targeted pilot projects and [2:09:05] conduct stakeholder outreach. [2:09:07] After completion, staff will [2:09:09] review all the data collected [2:09:10] from the pilot program, and if [2:09:12] the pilot analysis indicates [2:09:13] effective TMD VMT reduction. [2:09:16] Based on that recommendation, [2:09:18] the 5 initiatives, [2:09:19] the pilots will be expanded [2:09:20] to the entire region. [2:09:27] >> Is that the presentation? [2:09:28] >> That's the presentation. [2:09:29] >> Any questions or comments [2:09:30] by members of committee? Thank [2:09:33] you. This is received and [2:09:34] filed. Appreciate it. Item [2:09:37] 15, I'm sorry, public comment, [2:09:39] please. [2:09:41] >> This is public comment [2:09:42] for item 14. Please press pound [2:09:43] 2 if you'd like [2:09:44] to make a comment. No public [2:09:50] comments. [2:09:52] >> Okay this is received and [2:09:53] filed, and we will, we have [2:09:55] received it and it will be [2:09:58] filed. Item 15, countywide [2:10:00] planning major project status [2:10:03] report. We have polled. We [2:10:04] thank you [2:10:05] for receiving the report. Do we [2:10:07] have any questions? Okay, we [2:10:10] will review and we'll be in [2:10:12] contact should there be any [2:10:13] comments. We're now [2:10:17] at the public comment. [2:10:20] >> This is public comment [2:10:22] for item 15. Please press pound [2:10:23] 2 if you'd like [2:10:24] to make a comment on item 15. [2:10:28] No public comments. [2:10:29] >> My crystal ball told me [2:10:30] that. We [2:10:34] at general public comment now. [2:10:36] Do any members [2:10:37] of the public have any comments [2:10:39] on items that are not [2:10:41] on today's agenda? [2:10:42] >> We don't have anybody [2:10:43] in the room [2:10:44] for general public comment. If [2:10:45] you're on the phone, [2:10:46] please press pound 2. No [2:10:51] general public comments. [2:10:53] >> Public comment is now [2:10:54] closed. The agenda is now [2:10:55] exhausted. The meeting stands [2:10:56] adjourned. [2:11:00] >> Construction committee will [2:11:03] begin at 1:30. [2:11:06] >> Let me say before we go, [2:11:07] I just want to say to you, [2:11:09] Director Najarian, it is such a [2:11:15] joy, and we look forward [2:11:18] to remaining in contact. We [2:11:19] know you won't go far away [2:11:21] from transportation, but you [2:11:23] have a legacy that is worth [2:11:25] repeating. [2:11:26] >> Thank you, Madam Chair. I [2:11:27] have loved working with you. [2:11:28] Thank you.