[This transcript was generated automatically from audio using AI and hasn't been reviewed by a person -- it can contain mistakes, including plausible-sounding sentences that were never actually said. Treat it as a starting point, not a verbatim record.] [0:13] Good afternoon and welcome to PDC. We're going to hand it over to Mr. Tom Martin for [0:18] time for planning or a minute for planning or whatever your preference today, Tom. [0:22] I think I'm supposed to still keep it to a minute. [0:25] Okay. [0:25] So we'll get going. Good afternoon, members of council. A couple of things you guys might be interested in is [0:31] we've received a conditional use permit application for property on 802 Court Street. [0:38] that property is going to be one they are proposing to convert it into four [0:43] residential units. We've received a site plan proposing construction of a 3,180 [0:50] square foot car wash and parking improvements at 2735 Wards Road that's [0:56] just below going south of the Wawa that's under construction. We had a [1:03] subdivision plat for three lots at 5206 Tariana Road. Another subdivision plat [1:09] proposing the creation of 60 lots for single-family homes at 5153 Boonesboro [1:15] Road. The building permit for the Wawa at 101 Marigold Court which is [1:22] Rose Hill has been issued. And then some neat things that we don't normally get [1:27] to talk to you about is these are some condemned structures that are no [1:32] longer condemned, one of which was due to a fire at 212 [1:38] Winhurst Drive. All of those repairs have been completed and [1:42] that structure is no longer condemned. Also 1107 Polk Street [1:48] that building had been condemned since 2025. [1:53] All the renovations have been completed. [1:57] 1714 Monroe Street, another condemned structure that those [2:02] repairs have been done also no longer condemned and then a permit for 3102 [2:10] Memorial Avenue that was a fire earlier in April of this year I believe it might [2:16] have been arson but they have pulled permits to renovate that building so a [2:20] lot of good things going on thank you Tom yeah you know to Court Street which [2:27] was zone b1 what is it zone now for the four residentials it's but it's [2:32] zone to be worn, which is a limited business office. [2:35] I'm looking for a CUP. [2:37] By CUP, if approved by council, they [2:40] could do the residential. [2:41] Yes, sir. [2:43] Any other questions from Mr. Martin? [2:46] All right. [2:46] Thank you so much. [2:48] We are going to kick it over to Greg as we go, [2:51] I'm assuming, Gainel. [2:53] Yes, thank you. [2:55] We have major project updates next for both public works [2:57] and water resources. [2:58] I think Clay Simmons is going to walk us through some, [3:03] and Gaynell through others and I will turn it over to them so as they sort out which [3:06] projects belong to which. [3:10] Hello, Lee Newlin is on vacation so that's why I'm here in his stead to report on the [3:15] transportation projects. [3:17] The first one is Bedford Avenue, the total cost is $24 million. [3:22] We do need some additional funding from VDOT, hopefully some smart scale funding in the [3:26] amount of $8.8 million. [3:28] We hope to start in spring of 27 and finish in winter of 29 or 30 where we've [3:36] got a preliminary bridge report that is submitted to VDOT for review and once [3:41] they approve that we'll be able to move on that will actually get the project [3:47] back on time and back on budget once VDOT approves that and then we'll move [3:52] on with the rest of the project. Basically this project is going to be [3:56] replacing the bridge it's rated poor and we are going to add a sidewalk in that [4:01] particular area. [4:05] Breezewood drive improvements there are a total of ten [4:08] point three million dollars by the way there is a map because I think Ms. [4:12] Redeemer you liked the map so there's a map right there in front of you sorry I [4:16] should have told you that of the project location so you know where [4:20] they are. [4:23] We've got additional funding of 486,000 through revenue sharing [4:29] We anticipate construction to start in summer of 27 and finish in winter of [4:35] 2029. We're in 60% design. We had a public hearing June 25th at Heritage [4:42] Baptist Church and it was fairly well attended. It was workshop type event and [4:48] there was about 20 people there along with our consulting engineer getting [4:51] input from the public. This project will entail improving the pavement, [4:56] adding sidewalks, increasing the lane width a little bit, [5:02] and improving some of the drainage. [5:05] And the project is currently on time and on budget. [5:10] Fifth Street project is a $7.3 million project. [5:14] It is fully funded. [5:15] We are in the throes of construction right now. [5:18] We anticipate finishing late this year [5:21] or early next year in winter. [5:24] We're working on underground utilities at this time. [5:27] It is on time and on budget, but we are hoping that they can add some additional crews and speed it up a little bit and get it done a little early. [5:35] And so we're hoping on that. This project will finish the Fifth Street corridor, all the improvements along this corridor. [5:44] We're replacing utilities as needed, removing the concrete pavement and providing new asphalt, improving drainage, and also improving ADA access with improved sidewalks. [5:58] This is a downtown renewal project. You'll hear a little bit more probably from Scott [6:03] Parkins on this. We actually provide construction administration for this and [6:08] we our part in this is to fund the actual streetscapes and I'll let Scott [6:14] get into this. Our part of it on the public work side is about 6.1 million [6:18] and that is just for street great scape improvements and those types of [6:22] things. And I believe there's a ribbon cutting coming up here in July 21st so [6:27] We're excited about that, and Main Street will be done. [6:32] John Lynch Bridge, $7.2 million project. [6:36] We started construction in winter. [6:39] We anticipated it to be done in 2020 July of this 2026. [6:44] The railings are underway now, and the project [6:48] is going to be a little late. [6:49] And there's a couple of things, reasons for that. [6:52] The railings are behind because they're actually [6:54] having to drill the holes onsite [6:57] to make sure that they fit properly and that has slowed progress down tremendously. [7:03] We also have some things on back order like ADA compliant plates for the bridge joints [7:10] as well as inlet coverings so that it's safe for pedestrians. Those are back ordered. [7:15] We still anticipate being done into August beginning of September for that project. [7:25] 221, 501, 221 Intersection, $93 million project. [7:30] You all are all very familiar with this project and we're really happy. [7:34] We got the grant recently, the $24.9 million, that was huge for us. [7:40] So that was a huge win for us. [7:44] Now the project appears to be fully funded, so that's good news. [7:48] and we have a public hearing scheduled August 20th at Heritage Baptist Church [7:55] to move that project forward. The project is on time and on budget. We do have a [8:00] pop-up scheduled for the work session today to recognize some of the public [8:04] work staff who worked really hard on that grant. So I just wanted to let you [8:07] guys know as we're going through this that that is planned for four o'clock [8:10] for the full work session. The Hollins Mill Road Bridge, a $19.1 [8:17] million dollar project. It is rated poor. This hopefully will be fully funded [8:23] with additional revenue sharing. We should start in fall of 2029. This should [8:28] actually address the low water bridge that is a part of the trail so that [8:33] that will improve that. That low water bridge is often not, you cannot use it [8:39] because it's covered in water. So we plan to improve that. People will tend [8:43] to cross the road there, little kids with bikes, crossing Hones Mill Road, so that's [8:48] going to be a part of this improvement. [8:49] So we will make a better access to the trail from there. [8:54] The preliminary bridge report is being prepared now and then that will go to VDOT for approval [8:59] and it is on time and on budget. [9:02] And I will turn it over to Clay for his and I'll just keep clicking. [9:06] If we could actually do a quick pause, I don't know if anybody else has questions. [9:11] I always have questions. [9:12] So I'll pause here. Does anyone have questions for gain now? Okay. All right [9:16] I'm gonna run through just a couple really quick. Okay, and thank you so much for the updates here. This is awesome [9:27] Oh, and I don't remember what that question was. We'll skip to this one. Okay [9:33] so [9:34] with [9:35] Breezewood drive improvements, I'm just curious how we prioritize [9:40] sidewalks and if that has to do with the revenue-sharing arrangement or why. [9:45] Just because when I drive Breezewood Drive I don't typically see pedestrian [9:49] traffic and maybe I'm missing it and I love sidewalks. I'd love to connect more [9:54] of our sidewalks and I know Tom loves sidewalks. I love sidewalks but I'm not [9:58] sure just from a fiscal standpoint if Breezewood Drive would be where I [10:02] would typically prioritize it. So I'm just curious how that plays out when [10:06] it comes to revenue-sharing the decisions that are made with that element. [10:11] What happened with that is this was actually a three-phase project, and this last phase [10:17] got eliminated. [10:19] So we had intended to go all the way to the end of the project, which would have been [10:23] at the apartments. [10:24] And we have been getting complaints about not being able to walk. [10:28] There are walkable places there, Aldi sheets. [10:34] So there are places that you can walk. [10:36] we have been getting complaints. Okay. This pavement is in poor condition, so we [10:41] were going to have to do something. The drainage is in poor condition. We had to [10:45] do something, so we prioritized this in the CIP as a complete transportation [10:52] project and not just repaid it. Okay, that's helpful as far as thought [10:56] process. I really appreciate that, and I'm a fan of multimodal. I was a bike [11:02] commuter for years in the city which is a lot friendlier to bikes now and then [11:09] with Hollins Mill Bridge lighting is their opportunity for and I don't know [11:16] how that would play into this project per se but the lighting has been a real [11:21] struggle at least for me I know Kurt likes to complain about his old eyes I [11:25] think I'm gonna have a new prescript here when I go in so lighting along in [11:30] there what can be done to just increase visibility as well as kind of that [11:36] multi-modal element with pedestrians. Yeah I think what what we'll do is I will [11:42] pass this on to Lee Newlin and we can definitely consider that as a part of [11:46] the project. We are just in preliminary design so this is the time to make [11:51] suggestions like that so as we move through design that we can look at what [11:54] we can do to improve the lighting through there. Okay that would be [11:57] I think there is power down there because the park is lit a little bit, but the road is kind of dark, especially under the bridge. [12:04] Yeah. Okay. I would definitely pass that along. Yeah, just with the trees, it gets really shadowy. [12:10] And there have been people walking, and it's really hard to see people walking at dusk and at night. [12:17] Okay. I think that's all I had other than the congratulations on 501-221. [12:22] one. But I'm sorry. It was the last of the bridge on House [12:28] Monroe. When was that last done? Oh gosh, I couldn't really tell [12:33] you quite honestly. Obviously now since I've been deputy director [12:38] assistant director. So that's about all I can tell you. But it [12:41] is in poor condition. So we definitely need to do something [12:44] with it. We're just taking that opportunity to improve the [12:47] access. Yeah. Excellent. Thank you. Thank you. All right. Okay. Good afternoon. Thank you for [12:54] having me here today. I'm talking about Miller Park pool for a second. The project [13:00] consists of the removal and replacement of the pool along with some minor [13:07] interior innovations to the existing pool house. Total cost of the project is [13:13] $10.5 million, it's fully funded. [13:17] Anticipate start construction start [13:19] is going to be summer of this year. [13:23] Anticipated construction finish will be summer of next year. [13:28] And we are just now wrapping up design. [13:31] The project is out for bid, so we're [13:33] in sort of that transitional phase. [13:35] With the project, we expect to have bids back next week. [13:39] and currently the project is on time and on budget. [13:56] There we go. [13:58] Talking about the, moving on to the public library [14:01] renovation, total cost is $12.2 million. [14:05] Construction is fully funded. [14:08] The FF&E was approved in the FY 27 budget. [14:12] Construction started March of 2026. [14:15] The anticipated construction finish is summer of 2027. [14:21] We are under construction currently, well underway with the notice proceed being issued March of [14:27] 2026. Currently the project is on time and it's on budget. [14:35] Those are my two, I believe. [14:38] Any questions? [14:41] Yes, sir. That got released. We'd be happy to get it back to you. We put out [14:47] about a public notice for that, showing the latest concept design, be happy to send that [14:55] to you again. [14:56] Thank you. [14:57] If I went to, like, Splash Valley or something, and... [15:00] County the other day and just see what they had. I'm trying to make a comparison of what they had [15:04] which is a county project versus what we're doing here in Lynchburg. So I'll just I'll look at that [15:08] when I get another copy of it. Sure. Thanks. Appreciate it. Thanks so much and we'll hand it [15:14] over to Mr. Tim Mitchell. [15:20] It's my pleasure to give you an update along with Scott Parkins of [15:24] the major capital projects for water resources. A quick update on the Blackwater CSO tunnel. [15:29] tunnel. We just finished the drill and blast operations, so we're all the way to the end [15:36] of the tunnel now with the excavation that wrapped up on Saturday. And now the next step [15:42] with the tunnel excavation would be the shaft going vertically to a long point of [15:50] honor trail up near Hollins Mill Road for the drop shaft for the sewage and storm [15:56] wanted to drop into the tunnel. So that will be ongoing here soon. There's a lot of activity [16:03] at that end of the tunnel as well. The project is on schedule and on budget. So we are moving [16:11] ahead very well with a big project with no issues really. I mean it's a pretty amazing [16:19] project that we've gone this far with really relatively few issues. [16:26] led service line inventory. This is the city-wide project that y'all are pretty [16:34] well aware of because of all the discussions we've had related to it but [16:37] we are currently trying to identify all the unknown service lines in the city [16:44] about 18,000 privately owned and about another 2,400 publicly owned lines that [16:49] we do not know the material of. We are out working throughout the city to [16:56] excavate small test pits to identify the material. We're also plugging that [17:03] information into, it's called machine learning, it's a computer program basically [17:08] that will help us to reduce the number of test pits we have to do once we get [17:14] enough data. So we'll use that to help identify the service lines and the [17:21] the Virginia Department of Health has approved that process. As far as the cost of it, we're [17:30] in the $10 million phase now. We recently were awarded the $15 million that we've discussed [17:35] with you previously. We anticipate the total project cost over the next 10 years of being [17:41] around $30 to $35 million. So we still have a ways to go. We'll see how that progresses [17:48] as we identify the number of lead service lines and lines that need to be replaced. [17:55] Dreaming Creek Anderson? Yes. [17:59] How is this impacting citizens in Lynchburg? [18:02] What is your feedback and what kind of participation are you getting in the [18:06] identifying of things? Is it what you anticipated or? [18:10] Pretty much. We've had some citizens that express concerns about [18:16] even the General Assembly gave us authorization [18:18] to excavate a small test pit on their property. [18:23] We've had some concerns, not a lot, but a handful. [18:29] And we're trying to address those individually. [18:31] If the customers are really opposed to it, we will move on [18:35] and try to address that later and figure out another way [18:38] to identify the service line material. [18:41] So overall, relatively good feedback. [18:44] And again, when we find a lead service line or a galvanized line that needs to be replaced, [18:53] the funding will cover the cost of replacing those on the private side as well as the public [18:58] side. [18:58] So that will be part of our plan. [19:01] Once we identify them all, then next October we have to submit a replacement plan of how [19:06] we're going to proceed through the city replacing all the service lines. [19:09] Is there a map on the GIS system that allows you to see where the pipes have been identified? [19:15] Yes. [19:15] Is that out there? [19:16] Okay. [19:16] I just didn't look, but it didn't. [19:17] Yeah. [19:18] And basically you can pull up any address in the city. [19:22] A lot of them are still unknown, but the ones that have been identified, there's a [19:26] circle that has two halves of it. [19:28] One half is color-coded indicating the material type on the private side and one half is [19:33] color-coded indicating the material type on the city side. [19:37] And the big picture, can you do it just by individual address or can you see the whole you can see the whole [19:43] When you're zoomed out and see the whole thing you just see a bunch of little dots [19:49] It's hard to tell but you can zoom in specifically and see individual addresses as well [19:58] Dreaming Creek Interceptor this is the the project that we're working on jointly with Campbell County [20:04] Utilities and Service Authority because of the additional capacity that they need in [20:09] the age of the interceptor. [20:10] They're actually funding about 56% of the cost of this project, so it's a $9.2 million [20:16] project and it's currently under design and we'll be working to acquire the easements [20:22] that we need over the next year. [20:26] We anticipate construction start sometime in the winter of 2028 with about an 18-month [20:34] construction period with completion around fall of 2029 yes [20:41] you probably heard [20:45] me do my dreaming about Dreaming Creek bike path to follow along same lines as [20:51] the center stuff there is there any way we can design this project in order to [20:58] make it efficient and less expensive if in the future a future council decides [21:04] to turn that into a bike path of some type? [21:07] We can, as we're developing the easements for it, potentially we could, usually the easements [21:15] identify the specific use of the easement. [21:18] We could potentially add a trail or bike path or whatever, I don't know how, some property [21:27] owners would be favorable to that, others maybe not so much, but we could certainly [21:33] explore that as an option so that the easements would be at least in place to proceed forward [21:38] with it. [21:39] If somebody wanted to do it, it would be not another brand new redoing the wheel. [21:44] Right. [21:44] And we'll have to look a little bit at the alignment of the sewer line, too, to see [21:48] if it makes sense to have a path over the top of it. [21:52] We would have to be able to have access, so it should be accessible. [21:58] So it certainly was something we could work with. [22:00] They put the accesses off to the side of the bike path, but the only real obstruction is [22:08] Dreamy Creek Road. [22:09] That one would be probably the most expensive part of a project like that. [22:13] But how are you all dealing with that for the interceptor pipe? [22:20] So the road crossings would be, I think we're deciding that to be warrings, as [22:25] you said. [22:26] So we wouldn't be. [22:27] You don't tear up the road at all. [22:28] Don't tear up the road. [22:29] They'll be tunneled underneath the roadway. [22:33] So we would probably need a similar path, [22:37] like what goes over there, Holland's Mill, [22:40] which I think they built in the 80s, if I remember right, [22:42] because I used to bike that all the time. [22:45] But that would probably be the way [22:47] to get past that obstacle on Dreaming Creek [22:50] if somebody ever wanted to do it. [22:52] We can certainly bring up the suggestion to the design team. [22:57] and Campbell County is involved in this as well so I don't know if I don't know [23:02] that there'd be any additional costs maybe a little with the easement [23:05] acquisition and I would imagine that would fall to the city since that would [23:10] be a city benefit but but we can bring it up to the design team and report back [23:16] next time we do a capital project. I'd like to know what the additional cost [23:19] is and in any way we can anticipate potentials that we could save a little [23:25] a little bit now to save a whole lot later. [23:28] Okay. [23:28] Make a little bit now to save a whole lot later. [23:30] All right, sounds good. [23:33] I'm gonna turn it over to Scott [23:34] to talk about the Abert water filtration plant, please. [23:38] Okay, thank you, Mr. Mayor, members of the council. [23:43] So the Abert is one of the two city water treatment plants [23:46] that serves primarily the western half of the city. [23:49] The plant was constructed in 1974, 75 timeframe, [23:53] So it's got about a 50 year life on it right now and we did a preliminary engineering report [24:00] and have come up with some areas that need to be upgraded on it. [24:04] Some of the items that have been identified of concern such as the pumps, [24:09] we're looking at doing operational funding to basically remove the pumps, [24:13] get them refurbished. [24:14] But there are several capital concerns that we do have that are going to be scheduled [24:19] in the next five to eight years, looks like 2033, [24:24] with the raw water pump station at Abert [24:26] and the plant itself. [24:29] So currently we're looking at about five [24:31] significant projects over the next eight years here, [24:34] the first of which is the raw water pump station [24:38] influence screens off the James River, which is used [24:42] when we have to pump from the James River [24:44] due to peddler water levels being low [24:46] or if there's an emergency situation [24:48] on the raw water line that requires us to use the James River. [24:52] So we deem that as our highest priority project. [24:55] The other projects include chemical feed system improvements, [25:00] concrete and structural repairs and masonry repairs to the building itself, [25:06] electrical and control improvements at the water plant, [25:09] and then lastly a generator and electrical improvements at the pump station. [25:15] Combined it's about $27 million estimated cost and again this will be split up over about eight years of the capital program. [25:24] Currently we are in design for the raw water pump station influence screen and the chemical feed systems. [25:31] Both of those are on schedule right now and we'll be moving into construction probably in the next year or so on the first project. [25:41] We already talked a little bit about the Main Street East Renewal Project, which I'm very [25:46] happy to say we are in the final stages of. [25:50] It looks like that we're going to be doing the striping this week on the road. [25:54] We've got final pavement down. [25:57] All the concrete work is done, utility work is done, so we should be reopening the [26:01] road either Friday or Monday. [26:03] I'm going to be conservative and say it'll probably be Monday. [26:07] But it's a big milestone. [26:08] I know everybody has been waiting for this day and we have as well. [26:15] It looks like that we are going to be about $500,000 underneath the contractor's guaranteed [26:22] maximum price. [26:23] So we're going to be saving a little bit of money with the city here. [26:28] I'm saying that the work is 99.5% complete. [26:31] We do have some plantings that need to go back in the last phase of the work that [26:36] And obviously this is not the time of year to do planning, so they'll be coming back [26:39] in September or October to just do a little bit of wrap up work there. [26:46] Richland Hills sewer, we are well into that project as well. [26:52] Currently they are working continuously on the sewer and the water connections, water [26:58] replacements and connections. [27:00] We have a spend deadline in November and looks like our anticipated construction [27:05] finish is going to be in October at this point. [27:08] So I think we should be able to meet the spend deadline for the ARPA funds that are on the project [27:13] So I'm calling this on time and we are on budget with this one as well [27:20] The next phase of our sewer extension program is going to be reaching out into the Maple Hills area [27:28] So we've got currently a combined water and sewer [27:31] So we'll be doing sewer extensions and we'll also be hitting the water replacements that are needed in this area as well with one [27:38] It's actually going to probably be a series of projects starting with [27:43] construction in spring of 2027. We're about 50% complete on the design phase [27:49] of that project right now. So this will be hitting the areas such as Maple [27:53] Hills, Drive, Wayne, Bryant, Westburg over in that area of the city. [28:03] One of [28:03] our two ongoing water line replacement projects is over in the Daniels Hill [28:08] area. We just started construction with that with Council and Dobbins back in May, so we're [28:15] very early on in the construction, not even 25% complete yet, but I think we've already [28:21] got at least one of the roads. The water line is complete on one of the roads, and they're [28:25] working on services there on Norwood Drive. So we're looking at an anticipated finish [28:31] of around October 2027 for that. Everything seems to be going very well on that project [28:37] project right now. We do have a second phase of the Daniels Hill Improvement Projects. [28:42] We're calling the north segment. That project is in design phase right now. It is currently [28:47] at about 90% design. What my anticipation is, is that that project will follow after [28:54] we complete the south section, so there won't be overlapping of the two projects. [29:01] The second ongoing water line replacement project is over on Fillmore, Buchanan, [29:06] and Pierce Streets. That one started in January of 2026. Anticipated completion is in July of [29:14] 2027. We've got about 25% of the work complete. I think it's probably actually a little bit more [29:21] than that now. That was probably last month. One thing that we did hit over the last couple [29:28] weeks on that project, it does include three blocks of work on 11th Street and our bugaboo [29:35] has been the trolley track system, the old trolley track system that's underneath some [29:39] of the city streets. [29:41] We were not aware of it under these in the design, and when we hit it, it became an [29:46] issue of going back to the designer, looking what we could do to alter any design to get [29:52] it out so that we don't have to go under the trolley tracks. [29:55] But unfortunately, that street is very clogged up with existing utilities. [30:00] We are looking at a change order of about 300,000 for the removal of the trolley tracks for three blocks. [30:09] And the concrete base that they're on as well. [30:12] Yes, yeah. [30:14] The next project is the next phase of the downtown renewal, which is going to be, we're calling it Phase 5, [30:21] the fifth project, and it's going to be taking place on Court Street between Fifth and Ninth Street. [30:27] We are currently about 50% complete on the design. [30:31] We're looking at wrapping it up by the end of this year on the design side of things [30:36] for a spring 2027 construction schedule. [30:40] This project will be a little bit different than the other downtown projects [30:44] where we saw extensive street removal and rebuilding. [30:48] This project is really targeting utilities mostly. [30:52] We are doing a little bit of repair on the streets and the sidewalks [30:56] but it's not gonna be nearly as comprehensive [30:58] as what you've seen on the other downtown phases. [31:01] So it's primarily gonna be funded [31:04] through the water resources side of things. [31:07] There'll be a little bit of public works [31:08] general fund money on it, but mostly water resources. [31:13] And I think that covers everything. [31:15] So, questions? [31:20] Now, Main Street. [31:22] So the completion is this month, you said? [31:25] Yes, we should be wrapping it up this week, actually. [31:27] That's amazing. So happy. Thank you for that. Appreciate it. Thank you very much. [31:32] What did y'all switch from the black polyline to the blue polyline? [31:38] Water lines. On the water lines? Yes. I noticed that. [31:41] Okay. So in years past we've used [31:45] copper for water service lines and ductile iron [31:49] for the main lines. We're still requiring ductile iron, which is the black [31:53] for the main lines, but we do allow PVC or HPE for service lines. [31:58] We changed a couple of years ago to allow a cheaper option from Copper. [32:03] And so that's what you're seeing a lot of the plastic and the blue is the service lines [32:07] going to the meters. [32:09] Okay. [32:09] I was just curious. [32:10] Yeah. [32:11] All right. [32:12] So I can run it any time I want. [32:15] That's right. [32:16] Okay. [32:17] All right. [32:18] Any further questions? [32:19] All right. [32:19] Thank you so much. [32:20] Thank you. [32:21] Thank you. [32:23] All right. Moving on to information item number three. We get Tom back. Hey, welcome back, Mr. Martin. [32:31] Oddfellows Road Bridge naming request. And I'm actually going to hand this over to Kurt to run because this is a constituent request in Ward three. [32:41] So I'll hand it over to Mr. Demer and Mr. Martin. [32:44] Just very briefly, as Councillor Simmer just mentioned, there has been a request to name [32:52] the Odd Fellows Road Bridge over 460 in memory of Earl Lee Brooks Sr. [32:59] Mr. Brooks passed away in July 2010. [33:02] I learned a lot about him this week, an interesting gentleman, and I believe one of his sons [33:07] is with us this evening, but he was known as the Earl of Lynchburg. [33:11] He raced in what is now the NASCAR Sprint Cup Series from 1962 to 1979, raced in hundreds of races. [33:22] Excuse me. [33:26] No [33:47] hurry. [33:48] You want me to jump in and pinch that for you? [33:51] Sure. [33:52] I do appreciate Tom doing this. [33:55] I passed out a informational material to everybody here today. [33:59] just this did come to me from from Dave Falwell initially and it's nice to see a [34:05] family member here as well. There's definitely community interest in this [34:09] and I've been approached by quite a few folks in Ward 3 that I represent. Being a [34:15] big NASCAR fan I was kind of excited about this as well for that reason but [34:23] the mayor corrected me this is not a renaming this is a naming there is no [34:27] on the current name if I'm correct about that. [34:32] The bridge is part of the Virginia Department transportation [34:34] system. [34:36] If council desires, we would need to have council [34:41] pass a resolution requesting the Commonwealth Transportation [34:45] Board. [34:46] Thank you so much. [34:48] It's [34:51] heck getting old, isn't it? [34:52] So the council would need to pass a resolution [34:58] requesting that the Commonwealth Transportation Board [35:01] name the bridge in memory of Mr. Brooks. [35:05] As part of that resolution, [35:07] Council would also need to agree to pay the cost [35:10] of preparing and installing the signs. [35:13] That's approximately $1,000, [35:15] probably a little less than that [35:17] and those signs would be installed by VDOT. [35:21] So what we're looking for from PDC is direction. [35:25] If you'd like for us to prepare that resolution, we would have it on your next work session agenda. [35:33] Well, that would be real helpful. Thank you. [35:36] They've also gone out and gotten petition signatures from local citizens. [35:42] A significant number. You'll see that in your packet as well. [35:45] If you have any questions, I [35:51] look forward to meeting you after this is over with, hopefully. [35:54] I hope you'll hang around and if y'all have any questions now it's a great time [36:00] you got all the folks here that are interested that might be able to answer [36:05] some of them it seems like a worthy request in my estimation so that's why [36:09] I'm happy to get behind it and support you in this endeavor. [36:15] Apparently his [36:16] garage was pretty much right underneath that bridge at one point. That's very [36:23] interesting that's what earlier today Mr. Patrick Ford to do some information [36:28] prepared by Ted Delaney up at the museum system okay awesome I didn't see that [36:33] yet so yeah that was one of the things okay that was Ted's always on top of the [36:38] history I love it I believe also one of his race suits is in the museum so is [36:44] that right display currently or not but I think it was for [36:53] for a while as part of a sportsman's exhibit, I believe, [36:57] but of that information in some of the research that Ted did. [37:03] Thank you. [37:08] Well, I believe you're looking for a motion for a recommendation [37:11] to bring it for a work session? [37:12] Or, I mean, Kurt's able to agenda-wise, so I'm not sure. [37:16] Right, so I think we'll have this on the next work [37:18] session agenda, and then we'll go from there. [37:20] Thank you. [37:20] Appreciate it. [37:22] And I apologize for my voice. [37:24] Not at all. [37:25] Thank you so much. [37:26] As a guy with a bad voice, I'm very empathetic about that. [37:29] All right, moving on to general business, we have two items today. [37:34] Both will come forward for a public hearing, so we're not going to... [37:37] Oh, no? [37:38] Well, good news on item five. [37:39] Okay. [37:40] In that there's recent court filing that identified both the administrator [37:45] and the sole heir for the peace property on Florida Avenue. [37:49] So I sent an email out this morning, subsequent to that email, [37:52] So we actually got confirmation that the administrator has agreed to accept the offer for the right [38:04] of way and we're preparing the documentation now to have that signed and we should need [38:08] to go down this path at all. [38:09] So we've removed the item from this agenda and then also from the agenda later this [38:14] evening. [38:15] So great news. [38:16] Great news. [38:18] Connected to the dots now. [38:19] That was what we were trying to do. [38:21] Yeah. [38:21] Exactly. [38:22] Okay. [38:23] All right. [38:23] So agenda item number four, and my understanding is this is coming for public hearing, and [38:29] so we're not going to make a motion on it today, but awesome, thank you. [38:34] So Liberty University has approached us. [38:36] They would like to take fiber optic up to their new dorm that they're renovating now. [38:42] They're taking it from their property on University Boulevard, and there's a map [38:48] over there that it's so small. [38:49] that's why I printed you one it's difficult to read but the vertical road [38:53] is Candler's Mountain Road the road to the left is University Boulevard headed [38:58] to the University and this other road is actually in access to the shopping [39:04] center that is owned by LU Holdings so they're fiber optic from their property [39:10] they want to bore under Candler's Mountain Road about 108 feet and then [39:16] And up to their property, which is the new dorm for them to have fiber optic. [39:21] It shouldn't hurt traffic in any way or impede traffic in any way. [39:26] And so we are asking, we are going to be coming and having a public hearing to have a license agreement with them for [39:32] them to provide fiber optic to that dorm. [39:34] And that's the just of this request today. [39:38] And it will come again in August. [39:40] Any questions from Ms. Hardy? [39:44] Thank you, ma'am. [39:46] Thank you, thank you. [39:49] Okay, roll call. [39:51] Yeah, roll call. [39:53] Dr. Wader? [39:54] Okay, I had a great fun at home office. [39:56] Someone called about some situation on Table Street, [39:59] some high rush stand that's on the abandoned property. [40:03] It's been abandoned for years. [40:04] I'll give you the address afterwards. [40:06] I just have to send us through an email yet, so quickly. [40:09] But they've just said it's been vacant for several years. [40:11] Press have passed away. [40:12] No answer in the community. [40:13] I think in Baltimore somewhere and it says she's called the office several times about the property being like overgrown and the kind of thing [40:21] But I'll give you the address later. It's on Taylor 15th and Taylor Street, and I was referenced to early Brooks [40:26] I wasn't aware of him. So thank you for the information. I wasn't aware [40:30] The mic when I look into maybe a historical marker as well. I'm gonna take the lady can check into that [40:34] We don't have this white anymore who was who was amazing in and get a historical marker [40:39] because I was a rock community, but it just, [40:41] but Ted can't tell you if it was, [40:43] it was a candidate for something of that nature. [40:44] Okay. [40:45] I'm going to throw a marker, [40:45] but I'll be talking to Ted Delaney [40:47] in front of his team and they can look into that. [40:49] That's all I have. [40:50] Thank you. [40:51] I remember when that movie, Grease Lightning, [40:53] came out back in the, what is it, early 80s, [40:57] I watched it and moved in. [41:00] Him and no Richard Prow, who played Wendell Scott. [41:03] Right. [41:04] They were partners. [41:06] And no, Grease just played my dad. [41:12] My dad was very close and a good friend, very good friend. [41:17] Did your dad run moonshine with Windows? [41:19] No, my dad did not run with Windows. [41:22] That's before the party was raised. [41:24] My dad was my friend. [41:29] You don't have to answer these questions. [41:32] Just so you know. [41:33] We had fun. [41:35] He was dead, son of his moonshine, so I got to keep the claim up, but they were very close. [41:44] And yes, that movie was actually written in the living room of our home. [41:51] The movie company came in with big, real to real recorders, and Wendell and my dad [41:57] sat on their cell phone and told stories of things that happened to him. [42:01] Of course when he got to Hollywood or where they kind of changed the things around the head to probably [42:09] That's good. It's good to meet you. Thank you. It's good to meet you all and [42:13] Thank you for the support. I just really love it. It tickles me to death [42:20] We lived our whole life was right there where the bridge was the shop was there the house was there [42:28] The whole family, the grandmothers, the grandfather and everything lived there, and the whole deal. [42:35] And the race shop, you know, he'd run the races out of there, and he also, he supported Lynchburg [42:45] very big on this race car, on the back of it, I don't know if you have any pictures [42:51] or whatever, but it was, see the historical James River in Lynchburg, Virginia, everything [43:00] on the call, you know, and it was, he would present the Chamber of Commerce gave him litigia [43:11] and he would hand out that litigia in different places down through the, we raced everywhere [43:16] were from Daytona to Oxford, Maine to Riverside, California. [43:23] It was just everyone. [43:25] And he would spread it out. [43:27] He was very proud of his city. [43:31] When he was elected into the Sports Hall of Fame in Lynchburg, [43:37] that was so meaningful to him. [43:39] And he just broke down. [43:41] That was the greatest news he had ever gotten, I believe. [43:47] Thank you. Thank you, sir. Thank y'all. Mr. Mayor, do you have any? Thank you. Do you have any further items? Okay. Mr. Deemer. [43:56] I just, if you started getting calls on street lights again, that's the danger of becoming the light guy. And that's okay. I'm not complaining. [44:06] But is there been any efficiencies or just the ability to get those into a pipeline and [44:17] then track when they're done? [44:18] Has anything happened or is there still using the same system pretty much? [44:22] Yeah, and that's an APCO system and at this point I don't think they have any new technology [44:28] beyond what they had last time we were here. [44:31] I know we are pushing them very hard on both reporting, being able to provide us with reports [44:40] of what's out and what's not and what's been reported, and then getting everything done [44:46] quickly that we report to them. [44:48] Okay. [44:49] I don't know if this is possible, but maybe what we do is we more prominently link [44:54] back to the app code system on our side of things, that if there's any way to... [45:00] To bump it up in visibility a little bit, give it a logo, or AI will make it all in 10 seconds [45:09] for you. You know, something about, this is the fastest, bestest way to do it, and I think [45:18] the closure thing is still the part I would love to get solved, that we can see when the [45:24] job was done without the citizen going back out and calling back up their city [45:30] councilman and the city councilman says well that's good and everything okay but [45:35] it's the ones that that seemed to languish for several months got it [45:40] brought razor to the attention that it was and now since we don't have [45:44] anything new maybe we can just make it a little more prominent on the city [45:48] side of things promoted a little bit. That would be really helpful. [45:55] That's it. [45:57] I've got one item and I'll bring it up in roll call with the work session as [46:01] well just because that's when the constituent will probably watch but if [46:06] if Ted Delaney would be up for doing maybe a presentation on one the [46:11] cemetery again and any development that has happened there but also there [46:18] are some historical sites in Lynchburg that are listed with the state and also [46:22] nationally but aren't necessarily recognized on the city website. And so my [46:28] understanding from Kent is that when it comes to the city recognizing a site [46:34] there's usually some kind of land use tie to that and so I just like to [46:39] understand that in a fuller dialogue as far as you know we've got some great [46:42] history in our city how can we highlight that more what does [46:45] council need to do in order to support that and promote that. [46:50] So that ties into your discussion with the marker and our discussion today with the bridge. [46:54] If he could come and we could have that dialogue. [46:56] I'd love to have that. [46:59] Awesome. [47:00] Okay. [47:01] Well, we've got 13 minutes. [47:04] Yes. [47:04] So we've got a moment here. [47:06] Our next meeting. [47:07] I'm sorry. [47:07] I should have pulled it up. [47:09] When's our next meeting? [47:10] September 8, I believe. [47:11] Okay. [47:12] We're going to go with it. [47:13] Our next meeting will be September 8. [47:14] at 3 p.m. here in the training room meeting adjourned