[0:02] Hey, good morning everybody. I want to [0:03] welcome you to the Magna Water Board [0:06] meeting at 888 [0:08] 8885 West 3500 South at our general [0:12] office building. I'd like to call this [0:13] meeting to order. Will you guys all [0:15] please stand with for the pledge of [0:17] allegiance? [0:21] » I pledge algiance to the flag of the [0:24] United States of America and to the [0:27] republic for which it stands. One nation [0:30] under God, indivisible, with liberty and [0:34] justice for all. [0:36] >> Thank you. I would like to uh welcome [0:39] our public and guests. And today sitting [0:41] at our dis table is our engineer Trevor [0:44] Andre. Our sewer manager is our [0:48] wastewater, that's better, his Dallas [0:50] headline. Um Steve Clark is over our water and Andrew Sumpion is our [0:58] HR. Jeff White, myself, Danny Stewart, [1:01] chair and trustees. Leo Fitzgerald is [1:06] our controller. Nathan Bracken is our [1:09] legal counsel and today will be helping [1:13] me is Clint Dilly, our general manager. [1:16] So we're going to move on to public [1:18] comment. Um, does anybody here have an issue with our agenda today? A [1:24] conflict. [1:26] Okay, I don't see anything. So, our [1:28] first person to comment to the board is [1:32] Tommy Martinez. So, Tommy, if you want [1:34] to [1:36] >> come up and [1:57] Yeah, we just want to know what's going [1:58] on with her. That bru [2:08] uh they take pictures and everything and [2:10] we told them it was blocked up the [2:12] street by the the tongs and [2:17] well here's the the thing on the [2:19] plumber. He said it was [2:24] >> Thank you. [2:24] >> It was in that drain pipe and they came [2:28] down there and put that that suction [2:31] thingy in that and it rushed all the way [2:34] down to my place and mine was the only [2:38] house with a basement there. It all [2:40] rushed in the house. So, I got I got a [2:43] question for you. So, the day I spoke to [2:44] you on the phone, um did you say that [2:47] now correct me if I'm right or wrong, [2:50] did you say that um the road the road to [2:52] Rooer I'm going to use that went up the [2:54] road they got in our main line? [2:56] >> No. [2:57] >> Okay. Okay. Okay. But so they didn't [2:59] shoot nothing down there cuz I was going [3:00] to say if they did that that's really [3:02] against the law because [3:04] >> we did we just went up there and checked [3:06] it. He pulled the that big cover off and [3:10] it was stopped right there. And when [3:13] they came down with that that shoot, [3:16] then it come running rushing down and [3:18] then it went right into my basement. [3:22] Okay. So, um, Dallas, you brought me [3:26] some pictures. I I got to see all the [3:27] pictures. They did the report and the [3:30] report showed all these rags. Um, [3:33] >> rags. [3:34] rags like they look like mechanic [3:37] rags or whatever they were. [3:39] >> No, it's it's more like um paper towels, [3:42] toilet paper, flushable wipes [3:45] and then that mixes with just your [3:47] typical sewer grit and organics and it [3:50] just turns into a a black paste. [3:52] >> Okay. So, do we have So, when we talked, [3:56] you never did really you told me kind of [3:58] a number. Do you know do you know what a [4:00] number is to make you whole? was [4:04] >> what was this going on just to to take [4:07] that stuff off the toilet? [4:10] >> But I mean, [4:11] >> but what I'm trying to say is they cut [4:13] your walls, right? They cut your walls [4:14] because you had you had sewage and [4:16] everything. Did they give you Have you [4:18] had anybody give you a bid on Cuz when [4:21] you talked to me, you told me it'd be [4:22] about $20,000. [4:25] >> This one is [4:29] gel. [4:31] A what? [4:32] >> He gave it to the glass filter. Is that [4:34] >> And then your uh the water company came [4:37] down and give us a bid over the phone [4:42] just to put it back together. It was [4:44] like 15. [4:47] >> Okay. Now, Mr. Chairman, I've got I've [4:49] got those numbers handy if you want me [4:50] to. [4:51] >> Will you please? [4:52] >> Sure. So, the mitigation and the cleanup [4:55] was $18,245.75. [5:00] And then the restoration and the repair [5:02] to put it all back together was an [5:04] additional $16,28043. [5:09] » Okay. [5:09] >> So, is that combined? [5:11] >> It would be total. So, add those [5:14] together. [5:14] >> Okay. [5:15] >> Holy cow. [5:19] » You're roughly 35. [5:21] >> I did. Yeah, I was the one $35,000. [5:24] >> I was the one that was there that that [5:25] day. [5:27] >> Mhm. [5:28] >> You just had come home from work. [5:29] >> So $35,000, right? [5:31] >> Roughly. [5:31] $35,000. [5:35] >> So I think the important thing some [5:38] things to consider for the board, we [5:40] certainly sympathize with your [5:42] situation. Um we know that uh that's [5:46] upsetting and no one wants to be dealing [5:49] with that issue. Um, I do believe that [5:52] we've handled it how we should handle [5:55] those situations with coming out trying [5:58] to assess what has caused the backup. [6:03] And I think that's where we may differ [6:05] with your assessment [6:08] um is we don't believe that it was [6:10] caused by something in the main [6:13] originally. Right, Dallas? [6:16] >> Right. Um, we believe it was associated [6:19] with your lateral [6:21] >> and that's [6:22] >> and I pushed all that in the [6:23] >> Well, that's [6:25] >> Are you trying to tell me I [6:27] >> no up the sewer line? [6:29] >> The issue from what Can you describe [6:32] what you found so that the board and Mr. [6:35] Martinez can [6:35] >> Yeah, I think the important thing to [6:37] recognize here is [6:38] >> Yeah, [6:39] >> we can pull up the pictures too on the [6:41] screen. [6:41] >> Yeah, let's pull the pictures up, [6:42] please. [6:42] >> So, Mr. Martinez's house sits two or [6:46] three homes. [6:47] >> I know exactly where it sits on the [6:49] corner. [6:49] >> Yep. And that's brick. That's upstream [6:51] of the manhole that had the debris in [6:53] it. So, you know, no issues at the the [6:56] neighbor, no issues at the other [6:58] neighbor, no issues across the street. [7:01] Um the the the debris that we saw [7:05] collecting them. [7:06] >> Just to clarify, when you say no issues, [7:08] how did you verify that there were no [7:10] issues? uh made contact with each of the [7:12] customers by knocking on their door. [7:15] >> So none of the surrounding homes had any [7:17] of the same issues. [7:19] >> Does that make sense that [7:20] >> Well, it does, but the question I have [7:22] here is so if they don't have any they they didn't have an issue, could [7:27] that stuff came down and could that came [7:30] down through and and brought the [7:32] blockage? [7:33] The way the way that I perceived it [7:36] based on our experience and what we were [7:37] troubleshooting that day was the same [7:40] type of stuff that the plumber was [7:42] pulling out of the floor drain and [7:44] pushing through the lateral is the same [7:46] stuff that we saw downstream [7:48] accumulating in the manhole. [7:51] So it's not that um when Mr. Martinez [7:55] said they went upstream and saw the [7:58] blockage and then we vacuumed it out and [8:00] it all rushed down to his lateral. It [8:03] was all below his lateral originally. So [8:06] it was never upstream of it. [8:11] » So do you have a picture of that? [8:19] » So this is the this is looking down in [8:21] the manhole. That's [8:23] >> not on the street. Correct. [8:25] >> Correct. Out on the street, two or three [8:27] doors down from the corner of Tommy's [8:29] home. And you can see that's just black [8:33] and brown mush, um, toilet paper, paper [8:37] towel, flushable wipes, anything that [8:40] you would put down your sink tub or [8:42] toilet. And then as that stuff compacts [8:45] together in the lateral and the [8:48] mechanical snake that the plumber's [8:50] using to push it all, once he gets that [8:52] to go, then it all rushes out to the [8:54] main and we get kind of that surge flow. [8:57] Um, [8:58] >> so it's in a big surge going through. [9:00] >> Correct. [9:01] >> Okay. [9:02] >> And then that's when their home starts [9:03] draining. Um, we never lost flow in the [9:06] manhole. There's still a quite a bit of [9:08] flow going through there even if it [9:10] doesn't look like it. But if we go to [9:12] the other pictures, you can see that [9:15] that's similar [9:18] makeup and and material type of what [9:22] they're seeing on the floor and piled up [9:24] there that they're pulling out of the [9:25] drains. [9:33] So, and if you can picture just a a [9:36] plugged lateral that's 4 in and it's [9:38] jam-packed with debris. and they're [9:40] rotting that with a mechanical snake. [9:43] You know, you can punch a little hole [9:45] and that's when it'll start draining. [9:46] And they did that the first day. They [9:48] got him draining and he had to call him [9:49] back out the next day. The next day he [9:52] stopped draining and they worked on it [9:54] for several more hours and that's when [9:56] they eventually made contact with the [9:58] district. [9:59] >> I thought we had a picture with some [10:01] stuff on the floor there. It's just it's [10:04] real hard to tell, but right in front of [10:06] that snake machine, um you can see the [10:09] pile of stuff that they're pulling out [10:10] of the [10:13] >> floor drain. [10:17] » I don't know. [10:21] » Oh, yeah. [10:22] >> We had to go to my kids's house to sleep [10:26] because of [10:27] >> Well, I know. I'm just looking at think [10:29] what a mess. I I just don't know how [10:31] that those rags and stuff would go up a [10:33] 4 inch lateral from the main. I I don't [10:36] see how that would [10:37] >> right. They wouldn't. [10:39] >> So So that's the challenge. Um well, I [10:42] I'm going to make I'm going to make an [10:44] recommendation to the board. Okay. [10:45] >> And you guys can go sideways. I mean, go [10:47] whatever way you guys want. I recommend [10:49] pay the $35,000. Let's let's make him [10:52] whole. Let's put a policy together [10:54] because we don't Our policies change all [10:56] the time. We one time we do this, one [10:58] time we do this. My recommendation, give [11:01] him the $35,000. Let's make him whole [11:04] and then let's us the district get a [11:06] policy in place and let's make sure the [11:08] policy and give it to legal counsel so [11:10] he can review it and we can go from [11:12] there. So that I don't know if I could [11:15] Can that be a motion, Nathan? [11:17] >> It certainly could. [11:19] >> That that is my motion. [11:20] >> Well, I'm recommending though you've [11:22] only got we've only you've only seen one [11:24] bid for fixing What's been [11:28] >> we went with the cheapest that you know [11:30] we [11:31] >> How many bids did you get? [11:34] >> They told us just to get you guys were b [11:37] they sent their people over our house. [11:41] >> Who is it that we used? Alice, who is it [11:43] we used? It was um [11:46] >> Is that the quotes from our insurance? [11:49] >> It is. Yes. [11:49] >> So that's the underwriter quotes. We [11:51] don't have any quotes from a contractor [11:53] or anything. That's just from our [11:54] instructor. So, you've got to get quotes [11:56] from a contractor. [11:57] >> So, my recommendation is go out, have [12:00] them come out because apparently this is [12:01] from our insurance company. [12:03] >> I already fixed it. I mean, [12:05] >> no, the [12:05] >> I couldn't I couldn't wait for you. The [12:08] insurance [12:08] >> So, do you have do you have receipts of [12:10] everything that you've done? If you want [12:12] to give [12:12] >> about the same [12:14] >> if you want to if you want to produce [12:15] every every receipt to the to the city I [12:18] mean to the to the water district and [12:22] that I I myself I don't have a problem [12:24] paying it [12:26] >> if you have all the receipts but we as [12:29] taxpayers as you are and I am and us [12:31] here we can't we can't just write you a [12:34] check without just you know throwing you [12:36] a check out say here you go we need we [12:39] need all the receipts to everything that [12:40] you've on down there to make you whole. [12:46] >> And if you've went over if you went over [12:48] on to make things nicer, we can't fund [12:51] that either. Just But we can fund I'm [12:53] willing to fund I'm willing to fund [12:57] >> the 35. [12:59] >> Well, if we have the if we have the [13:01] receipts. [13:01] >> Okay. [13:02] >> I can't I I'd get in trouble if I said, [13:04] "Here, Leon, go give me a check. Prefer [13:07] $35,000." [13:08] I can't do that. [13:10] How come your insurance company never [13:12] covered any of it? [13:13] >> Uh they were going to they told us to [13:15] come up and talk to them today. We told [13:18] them we're going to meet with you guys. [13:20] So they were going to come out to you [13:22] guys [13:25] if they didn't hear anything good from [13:27] you guys. [13:30] >> So do we want their insurance to come [13:32] after us? I mean what do you what's your [13:34] recommendation? Typically the two [13:35] insurance companies will work together [13:37] and find it out. I [13:38] >> And then who did you talk to today about [13:40] the another person [13:43] >> just the state insurance? [13:45] >> Okay. [13:45] >> So So my suggestion I mean the standard [13:47] process is it sounds like there's a a [13:49] question as to what's the cause. So [13:52] typically we've we've already reported [13:53] this to our insurance company. [13:55] >> Correct. And they've made they've made a [13:57] finding that it was no fault of the [13:59] district. [14:00] >> So our insurance company's made that [14:01] finding. your So my suggestion is before [14:04] we go further, have the two insurance [14:06] companies talk to each other because [14:07] that's usually the standard process. [14:09] >> Yeah. And my understanding is your [14:11] insurance company found it was no fault [14:13] as well [14:14] >> to us. [14:15] >> Well, to the district [14:17] >> and so which case they their insurance [14:19] company should pay for it depending on [14:21] the terms of their coverage. [14:22] >> Right. [14:23] >> And so that's that's maybe the question [14:24] I have legally. That's our challenge [14:26] >> is is the way that this should work is [14:27] if it's the district's fault, the [14:29] district's insurance should cover it or [14:31] you know we pay for it some other way [14:32] but if it's the homeowner's fault or if [14:34] not your fault but if it's not the [14:36] district's that it should be covered [14:37] under your insurance policy, [14:39] >> right? [14:40] >> Insurance should help him. [14:41] >> Yeah. So that's and so and the [14:43] difference the difference I just for the [14:46] board the reason my understanding the [14:49] reason that the board has participated [14:51] in the past is because when it's not [14:56] when it's found no fault but it is in [14:59] the main and there's no way to determine [15:03] it was a homeowner right [15:05] >> it was something that we didn't know [15:07] about it wasn't due to improper [15:09] maintenance it wasn't doesn't do the [15:12] district's done everything in the past [15:14] when that's happened and it's affected [15:15] multiple homeowners. [15:17] >> There have been instances when the board [15:19] has held them, [15:20] >> right? But I'm going to I'm going to [15:22] step out of the lane right now. [15:24] Insurance is the biggest fraudulent [15:25] thing out there. They turn around and [15:27] you pay insurance and pay insurance and [15:29] they're going to pick and choose what [15:30] they're going to pay. I I just seen this [15:32] happen to a friend of mine here about [15:34] two weeks ago on an incident and he's [15:36] been with his insurance company for 40 [15:38] plus years and they denied him and and [15:41] so my recommendation is have the two [15:43] insurance ours and his they're his [15:45] insurance work together let's come up [15:47] and like you said if you can produce all [15:49] the receipts of all the stuff that [15:51] you've done then I don't have a problem [15:54] moving forward but again I'm only I'm [15:56] the chair but these guys are [15:59] >> so I agree with that [16:00] >> Mick can I maybe motion then [16:03] >> I I because what I'm hearing you're [16:04] saying and this is my suggestion too is [16:06] I agree with you completely. I used to [16:08] sue insurance companies, but that said, [16:10] we haven't it doesn't sound like this [16:11] process is completed, [16:12] >> right? [16:12] >> So before because there's a chance [16:15] they're if they both are on the same [16:17] page, then it's a chance that their [16:19] insurance company would say, "Yeah, [16:20] we'll pay for it, right?" [16:21] >> In which case, there's no need for us to [16:23] go through it. But if if it ends up [16:25] being denied and they're left out in the [16:26] cold, then that's when we could have [16:28] maybe a further discussion. Okay. [16:29] >> It just sounds like maybe we're a little [16:30] premature at this point. [16:32] >> Okay. I had thought when I heard about [16:34] this that the insurance that had already [16:36] been denied, but you haven't been denied [16:37] yet. My understanding is [16:39] >> agree with a lot of stuff and I got to I [16:41] can't live like that. [16:42] >> No, absolutely not. [16:44] >> I had to I can't put my family in [16:47] something like that. No, [16:48] >> I won't do it [16:49] >> for for sure. But [16:50] >> I fixed it myself. [16:51] >> So, you fixed it yourself, but your [16:52] insurance company hasn't denied the [16:54] claim? [16:54] >> No. [16:55] >> Okay. So, that hasn't happened yet. [16:57] So [16:58] >> they they did too deny it because I got the they did they did deny it [17:02] because I got I got the letter. It's [17:04] been denied. [17:04] >> Okay. But so they denied it, but has [17:07] there have they talked with our [17:08] insurance company yet? [17:10] >> Yeah. [17:11] >> Okay. They need to do that. [17:13] >> Yeah. So I I mean I typically I'm not [17:16] >> Can you give Can you give them the name [17:17] of our insurance company so when they [17:18] leave here today they have the numbers [17:20] that your insurance can come so we're [17:22] not going back and forth and all that? [17:25] >> Dr. [17:26] Yep. [17:28] >> But like I said, if you two can work it [17:30] out and then whatever we have to do on [17:32] our end, I'm willing to do this. But my [17:34] deal is we need to have a policy in [17:36] place that actually stricts and stands [17:39] for where we're at. Cuz as I read our [17:42] policy, it's not really I mean it's kind [17:44] of here here. [17:46] >> Yeah. [17:46] >> And we need to have we need to look at [17:48] our policy and look have legal counsel [17:50] re review it and then take it from there [17:53] if you guys are okay with that. [17:54] >> Yeah. I think that's a good approach. [17:57] Um, it's setting aside what that policy [18:00] does is it puts money that we would set [18:04] aside in the account rather than in the [18:06] reserve funds. it goes to a separate [18:10] account that's just set aside for [18:12] situations [18:14] um where the district feels like, hey, [18:17] it wasn't our fault, but we'll [18:20] participate because maybe there's some [18:22] >> Well, and I keep going back I keep going [18:24] back to the 7200 deal when we had that [18:26] backup that flooded all them homes and [18:29] it cost the district a lot of money. And [18:32] I I feel like on our end, we could have [18:35] probably did things a little bit [18:36] different, but you know what? We need to [18:38] get a policy in place that's actually [18:40] going to be broad. So when something [18:42] like this comes, it's either yes or no, [18:44] and there's no gray in between. [18:46] >> So just for my benefit, why did your [18:48] insurance carrier deny your claim? [18:51] >> Because these guys said they're going to [18:53] pay for everything and they said the [18:56] plumber said was was the backup backup [19:00] there. So, so your plumber said that it [19:03] said it was the district's fault, but [19:06] Clint, I thought you said that their [19:07] carrier determined that it [19:08] >> Yeah, they determined that it was no [19:10] fault. [19:10] >> I did not. [19:12] >> Sure. [19:14] >> The letter The letter that I saw that [19:17] was mailed to [19:21] » Mick [19:22] was from our insurance, wasn't it? [19:24] >> Yeah. Yeah. There's [19:26] >> Have they really been denied? [19:27] >> Yeah. What? No, they have they don't we [19:30] don't use Kleinfeld. What's it's [19:32] Kleinfelter that you've been working [19:33] for, right? [19:34] >> Your insurance company. [19:35] >> Glad filter. [19:37] >> Cloud filter. That's your insurance, [19:39] right? [19:40] >> Yeah. [19:44] » Is that what the [19:45] >> Clint [19:48] filters through? Oh, okay. [19:54] » Okay. So, has your [19:58] Okay. That's through Oh, this is this is [20:00] your insurance through our [20:02] >> Olympus. Yes. [20:03] >> So, so this is from [20:04] >> This is from us from us. Lad Filter [20:06] represents us through Olympus. [20:08] >> That's right. [20:08] >> Yes. So, so you're is Is this what [20:10] you're referring to as your insurance? [20:12] Okay. So, this is our insurance company. [20:13] >> That's right. [20:14] >> Have you received anything from your [20:15] insurance company? [20:29] Okay. Yeah, they're saying that they [20:31] initially found it was on the city side, [20:34] but it was not from our determination. [20:37] >> So, there's a conflict between the two. [20:39] Okay. So, so when that happens, [20:41] typically the insurance companies need [20:42] at that point to confer with each other, [20:44] >> right? [20:45] >> And then [20:47] >> Oh, that'll be good. [20:49] >> That's what I said. What are we paying [20:50] the insurance for? They ain't covering [20:53] anything. [20:54] >> Well, that's you know, just like [20:56] California and those houses were they're [20:59] going out of business. I mean, that's [21:01] wrong. [21:03] >> Yeah, it is. [21:04] >> Trust me. I think about that every day. [21:05] I think if I have [21:06] >> if I have something happen to my house, [21:08] are they going to cover it? [21:10] >> It's like they pick and choose who they [21:11] want to cover. [21:13] >> Yeah. I would say we do both. I say we [21:15] instruct these people to call. Can we [21:16] make a copy of this? Because what what I [21:19] would suggest is that we have we [21:21] instruct our guys to contact their guys [21:24] and vice versa [21:25] >> because I'm not I I think the issue is [21:29] to our knowledge did these guys do an [21:31] independent investigation [21:33] >> or do they just base it off what your [21:34] plumber said? [21:36] >> You guys did they're the only ones. [21:38] >> Yeah, you guys did an independent [21:39] investigation. But has your insurance [21:41] carrier seen the results of their [21:42] investigation? [21:43] >> Our insurance come in? [21:44] >> No. [21:45] >> So they're just going off of what your [21:47] plumber said? Yeah. [21:48] >> Okay. So, that I think is the problem is [21:50] your plumber didn't have the ability to [21:52] do the investigation that they did and [21:54] your plumber determined that it was [21:56] likely on the city main side. And so, [21:59] these guys probably just went off of [22:01] that and they are denying you based on [22:04] in my opinion an incorrect assumption [22:06] because they're saying, "Well, you're [22:07] what?" They're denying you because [22:09] they're saying, "Well, that our policy [22:11] doesn't cover the city's system and [22:13] therefore you're uninsured. go after the [22:15] city or or in this case the district, [22:17] but I'm and I don't have your policy, [22:19] but I'm willing to assume that it does [22:21] cover stuff that's in the lateral. So, [22:23] if they're instructed that it is in the [22:25] lateral and our guys can give them the [22:26] information, hopefully that So, this is [22:28] typically how this process should work. [22:30] So, it sounds like there's a next step [22:32] that hasn't happened yet. So, in my [22:34] opinion, it's it's make we can totally [22:37] do what you want to do, but I I say [22:38] before you spend tax, [22:39] >> I agree with you. I I want like I said, [22:40] I want to keep us out of trouble. I want [22:42] to do the right thing. If we haven't [22:43] went and made the whole got it all done, [22:46] we need to put the puzzle fully together [22:48] and [22:49] >> but if their insurance company is on the [22:51] hook for this and they've been paying [22:52] for that insurance, they're entitled to [22:54] it. So, let's work together to make [22:55] their insurance pay for it. [22:57] >> Yep. [22:58] >> And then if that's not possible, then we [23:00] can come back and have this discussion. [23:02] Does that sound fair? [23:04] >> Are you guys okay with that? [23:05] >> Yeah. [23:08] because I it sounds like your insurance [23:10] company's operating off of just that initial fact sheet. They haven't [23:13] talked with ours. They haven't seen the [23:15] investigations we've done. And hopefully [23:17] if they do, that will bring in a [23:19] different section of your homeowner's [23:20] policy that typically covers this type [23:22] of thing. Now, I don't know what your [23:23] policy says, but that's what the [23:26] insurance company should work out. [23:27] >> Yeah. You guys are willing to come in [23:29] and take a look, but we did. I mean, we [23:33] >> Yeah, but that that should really be [23:35] your insurance company, right? and and [23:37] it doesn't sound like they have come in [23:39] and they they just saw that said it's [23:41] not our fault. Deal with somebody else. [23:44] >> Um and are trying to wash their hands of [23:46] it. [23:50] » Yeah, cuz like you like you say, you [23:52] just [23:53] >> Oh, I can imagine. I mean, [23:56] >> we've dealt with quite a bit of this [23:58] stuff over when we had an issue and [24:00] >> I was mad cuz I yelled at him. I said, [24:02] "I want your ass over here and get this [24:05] thing cleaned up. This is my house. And [24:08] I said, I won't bring nobody in here. I [24:11] didn't even want to go downstairs. [24:14] >> They came over. I says, "Hey, [24:16] >> just get just get it done. I don't care. [24:19] I mean, and they said, "Get the [24:24] what is it? The disaster thing." [24:27] >> Was that disaster cleanup is what we [24:29] used? Yeah, [24:30] >> we we don't make a specific [24:32] recommendation, but we do recommend [24:34] calling somebody like that with a [24:36] disaster. [24:36] >> Do we have do we have a list of of [24:38] people on that list that we could give [24:40] our people when we have this? So, [24:42] >> we do. [24:43] >> Okay. So, we do give that to them. [24:45] >> We just we do, but we say you can use [24:47] whoever you want. [24:48] >> Right. Right. Right. Right. You can't [24:49] say use me. [24:50] >> Looks like true restore was used. [24:53] >> Okay. [24:54] >> Is that correct? [24:55] >> True restore did the work. Yeah. [24:58] >> So, Nathan, really fast, you want where [25:01] do we where do we proceed from this? [25:03] >> So, what I'm what I'm recommending is we [25:05] contact our insurer. We explain the [25:08] situation in greater detail. We send [25:10] them a copy of this letter and we say [25:12] here's the issue is we have done an [25:14] investigation and determined that it [25:16] wasn't in the main and it was something [25:17] in the lateral. American Family [25:20] Insurance has determined that it it was [25:22] in our system which we've shown that [25:24] it's not. And so as a result, American [25:26] Family Insurance is incorrectly denying [25:28] the claim on an improper basis. And [25:31] therefore, please work with them to [25:33] figure this out and then report back. [25:35] Then you guys can do the same. Um, and [25:39] so that way now I'm not going to [25:42] guarantee that the insurance company's [25:44] going to agree, right? And that's but by [25:46] that point, maybe we can have the policy [25:47] adopted and so, you know, we'll be um [25:51] dealt with in that way. But like I think [25:54] so what they're excluding is [26:10] yeah storm drainer water seam or sewer [26:13] pipe off the resident premises. So [26:15] that's what they're denying you on is [26:16] they're saying it was off the premises. [26:18] That's where the blockage occurred. [26:20] That's not what we covered. But if [26:22] they're showing it's on the premises [26:24] that this should not apply. Their denial [26:26] would be inaccurate. So does that make [26:28] sense? [26:29] >> So we'll contact our guys and tell them [26:31] to work on this. Explain it. I do the [26:33] same. [26:35] >> No. No. [26:36] >> Are these ours? [26:37] >> Oh, did we give them back their copies [26:39] already? Okay. All right. [26:42] >> Is that fair? [26:43] >> Yeah. [26:43] >> Okay. [26:47] >> Appreciate you. [26:48] >> Thank you. [26:49] Tommy. [26:52] Okay, let's move on to our employees. [26:56] Okay, thanks board chair. Uh, first we [27:00] got just we had three our three newest [27:03] employees attend Flagger certification [27:05] course. Gavin Ferguson, D Honey, and [27:09] Taylor Warner. Um, this is a good step [27:12] for them as we get new employees. This [27:14] is one of the first things we like to [27:15] get them certified in so that they can [27:19] be a good part of uh traffic control [27:23] when we're doing some repairs. Um helps [27:27] keep us safe and so we're glad that they [27:29] were able to get that done. And then [27:31] next we have Dylan Delbell. Uh he's here [27:35] with us today. Uh what we brought him in [27:39] for is a couple months ago we were [27:42] looking at possibly making some changes [27:45] to our health and wellness program to [27:47] see if we could uh boost the [27:51] uh [27:53] employee [27:56] enrollment in it. Get them to buy in a [27:59] little bit better. And so at that point [28:01] >> say when you say buy in, explain to me [28:03] what you mean by that. that we were [28:05] going to be doing things that they that [28:07] they wanted to participate in better. We [28:09] had the same employees doing it every [28:11] month, which was probably I'd say around [28:15] 24 of the 35 were participating all the [28:19] time. [28:19] >> So when you Okay, I'm lost. So when you [28:22] say 30 participating in what [28:25] >> we do, [28:26] >> is it something that we as the board [28:27] don't know about? No, we you've you've [28:30] approved it in the past. [28:31] >> But what [28:32] >> if we do monthly challenges where we [28:36] encourage them to do things like [28:38] exercise, [28:40] uh healthy healthy eating. Um [28:44] >> well, where do I where do I sign up for [28:46] that? [28:47] >> We'll we'll get we'll get you in. [28:49] >> And so we do mental health months, we do [28:52] >> I need that, too. So [28:53] >> we do financial health months. We do a [28:55] lot of things with it to try and help [28:57] the employees better their their health [29:01] and wellness. [29:02] >> And I love that. That's a great idea. In [29:03] fact, now, okay, it's all I'm trying to [29:06] put everything. Okay. Yes. And so [29:09] when we decided that we were going to [29:11] change the program a little bit, we went [29:13] to the employees and we asked them if [29:16] there was any ideas that they could come [29:18] up with that would make them want to be [29:21] more involved as well as help the people [29:24] that if they're already doing it, help [29:25] the other people get involved. And to [29:28] Dylan's credit, he was not only the [29:30] first, he was the only one that stepped [29:31] up and he came with a lot of good ideas. [29:34] >> Great. Um, probably the best the best of [29:36] it was not only did he come with a [29:38] solution with some some program ideas, [29:41] but he also came with the idea of, hey, [29:43] let's build a a health and wellness [29:45] committee like we have with some of the [29:47] other things. We get a person on each [29:49] crew that will help drive their crews in [29:52] reminding them to participate in these [29:54] initiatives. And so, uh, with Dylan's [29:59] help, we're making that committee. And [30:01] we're just grateful when, uh, employees [30:04] take the the role of improving our [30:08] culture. And so, thank you, Dylan. We [30:12] got to get [30:13] >> presenting with a little something from [30:15] >> He needs to be in the little back of my [30:18] head. The voice in the voice is in my [30:20] head. You need to be in there. [30:22] >> Do you have anything to add, Dallas? [30:24] >> Dylan. [30:24] >> Yeah. [30:25] appreciate that. [30:28] >> Thank you. [30:29] >> I would just say Dylan's a huge part of [30:31] why morale at the treatment plan is so [30:34] big. Um I think the cool thing about [30:37] Dylan is he recognizes how hard the [30:39] board has worked to try to increase [30:40] morale over the last several years. Um [30:44] and the board can do so much to increase [30:46] the morale, but it's up to all of us to [30:49] maintain that morale. Um, so for Dylan [30:51] to be able to see the whole picture and [30:53] see all the moving parts, um, it's just a testament to how hard he [30:58] works and and how much he likes the [31:00] district and his role. Um, and we [31:02] appreciate the mutual respect and it it [31:05] just says a lot about who you are and [31:07] where you're going. So, thank you very [31:08] much. [31:09] >> Great. [31:09] >> Thanks, D. And I'm and I'm really [31:11] impressed because like I said when I [31:12] come down tour the sewer plant you know [31:14] just you guys are all big great you know [31:16] like a big family and you guys work [31:18] really all work really good together and [31:20] if there's any issues you guys figure it [31:21] out and I'm I've always I've always said [31:24] this when I come down there I'm just [31:26] amazed how you guys all work together [31:28] and that's you don't see that much [31:29] anymore. [31:30] >> It's good to see a positive person for a [31:32] change you know. [31:34] >> Thank you. [31:35] I've been working on. [31:43] » Okay. Thank you, Andrew. So, let's move [31:46] on to our our common consent items. [31:50] >> Minutes of the regular board meeting [31:51] held February 12th, 2026. Minutes of the [31:55] public hearing held February 19th, 2026. [32:00] Expenses from February uh 2nd to March [32:03] 1st, 2026. General expenses 1,639,951.85 [32:12] size bank pal payment $83,53083. [32:18] » I'll second it. [32:19] >> Motion second. All in favor? [32:21] >> I I [32:24] Okay, Clint, let's move on to your [32:25] general general manage report. [32:27] >> Thanks, Mr. Chairman. on staffing. Just [32:31] uh highlight a couple things on the [32:33] water operations, the construction crew. [32:36] We had that service maintenance position [32:38] open. Uh we've went through some [32:41] selection and uh we've made an offer and [32:44] he's accepted. So that position will [32:46] start 23rd [32:48] >> on the 23rd. October 23 or March 23rd. [32:51] >> March 12th. Be a long wait. [32:54] >> Six. Wrong season. [32:55] >> Yeah. [32:56] >> Who is it? [32:57] >> Uh Daniel Klein. Daniel. [32:59] >> Yep. [33:00] >> Daniel [33:02] >> came recommended uh several people in [33:06] the district. He's from the area. [33:07] >> From the area. He's been doing cabinetry [33:09] for a while. [33:12] >> Well, he's got two weeks. He can get us [33:13] some cabinets. [33:15] >> That That must be a tough job. That must [33:17] be really relentless. [33:19] >> And And I just wondered, do we have any [33:21] recourse on people to come and treat our [33:23] customer service people bad? Oh, on the [33:27] Well, obviously with customers, we're [33:32] trying to understand what they're coming [33:34] in so frustrated and angry about. [33:39] So, we have systems in place to try to [33:42] diffuse those interactions. [33:45] >> Can you share them with me? [33:47] >> The first one is is uh Oh, hey, I can [33:50] see you're upset. Let me have you talk [33:52] to my supervisor. Right. And just that [33:55] initial, [33:57] we call it stall and call someone [34:01] >> that usually brings the temperature down [34:04] just by going through that act. [34:06] >> Um because it brings the customer now [34:09] recognizes oo I've been I'm I'm my [34:12] emotional level is enough. I can tell [34:15] this person wants to pass me on to [34:19] someone else. Right? So that's the first [34:21] step. That's usually pretty effective, [34:24] but it's still discouraging. I mean, [34:27] there's a downside to that in that the [34:29] customer or the employee feels like they [34:33] can't address the issue, right? And [34:36] that's certainly an option for them, but [34:39] we also don't want to subject them to [34:41] unnecessary [34:42] >> taking a toll on our employees though. [34:44] This is the second employee we've had [34:45] that's turned it down. [34:47] >> Yeah, [34:47] >> it's a tough role. So, what can we do to [34:49] improve that? Do we need to send letters [34:52] out to our customers to say [34:54] >> I don't we could I don't know that that [34:57] would [34:59] >> it's going to it's going to reach the [35:01] people that we don't need to reach in my [35:03] >> well and and and right now let's just [35:05] say we're in a really ugly place right [35:08] now in this in this country and I'm just [35:10] going to say as me as the mayor of the [35:12] town I deal with this every day. Nathan [35:14] knows what I go through. uh he because [35:16] he's our legal counsel and it's ugly and [35:19] you know and you try sometimes you just [35:21] you want you if they're wrong you can't [35:24] just say agree because then they figure [35:25] you you're on their side but you say hey [35:27] I understand I understand but that still [35:29] ain't good enough people get really mean [35:31] and nasty I mean and and and like you [35:34] say I understand your point but I [35:36] understand I like what Clint does is I [35:38] wish I had some say oh by the way here [35:40] let me hand this over to somebody else [35:41] well I'm the the buck stop this buck [35:44] stops at me Right. So I just but I like [35:47] that. I mean you know [35:49] >> it does seem to be effective in a lot of [35:51] cases [35:52] >> but like I said [35:53] >> but if it reaches if the customer [35:55] becomes belligerent and name calling and [35:57] personal attacks we have direct we have [36:00] directed them to say hey I'd love to [36:02] help you but I can't help you if you're [36:04] going to call me names. [36:06] >> I got to let you go into Cape that's [36:08] professional. Give us a call back when [36:09] you are able. So they [36:12] >> mostly phone or in person? [36:15] >> Phone. [36:17] >> A lot of people say a lot of things over [36:19] the phone that they won't say to you [36:20] face to face. Right. [36:21] >> Okay. [36:22] >> I think we try to do is we have a daily [36:26] check-in meeting in the morning. We try [36:28] to talk about those things. Uh we try to [36:31] have a sense of humor about it if we [36:33] can. Um we try to talk through [36:36] strategies. we work on mental health and really trying to and Lyle has done a [36:43] great job with the team. Um I think it's [36:47] one of those unfortunate circumstances. [36:50] There's probably more uh going on. It [36:54] sounds like there's some interest in [36:56] going back to school. Um so [36:59] >> how long has she been with us? Three [37:00] months? [37:01] >> No. [37:01] >> Uh probably six. [37:03] >> Six months. [37:04] >> And she started in June. I really like [37:07] her a lot. She's got a great personality [37:09] and she was able to deal [37:10] >> a lot to the office. [37:12] >> She was a sweetheart. [37:14] >> Yeah. [37:14] >> Okay. [37:15] >> You know, but I understand that with [37:16] this incident that we had up here on [37:18] 4100, I got called a a death mayor, you [37:21] know, like everything falls onto me. [37:24] >> Awful. [37:26] >> But we'll continue to look. I think it's [37:29] always good to look at things that we [37:31] can do. [37:32] >> Turn the volume down and say hello. [37:34] What? [37:36] The hardest part is they're dealing with [37:37] people that are having one of the worst [37:39] days of their of their year. [37:40] >> No kidding. I I just don't. [37:42] >> But nobody needs to be cussed and sw and [37:44] swore at, you know. I mean, [37:46] >> cuz I've done that and had people hang [37:48] up and then I even get mad and then they [37:49] won't answer the phone. [37:53] >> So, [37:53] >> no. And if is there classes? I mean, I [37:56] don't know what kind of classes, but [37:57] >> yeah, they have taken classes on [37:59] >> customer service classes [38:00] >> on how to deal with upset customer. [38:02] >> I think you're doing a good job. Yeah, [38:05] >> you just can't predict what kind of [38:07] stuff that's going to come in on the [38:08] >> you know and each of us each of us has a [38:11] different sensitivity to that. Some [38:13] people it doesn't bother, others it [38:15] really bothers and that's okay. You [38:19] know, [38:19] >> it's like having thick skin, but how [38:21] thick that how thick can that skin [38:22] really be, right? [38:24] >> Happy leather. [38:26] >> So, that position we did post in house [38:29] and one of our other employees is going [38:31] to move over uh to that position. [38:34] >> Can I ask you really quick just off [38:35] hand, what is the pay of that job [38:37] starting out? Do you know what that pay [38:39] is? [38:39] >> Uh I can tell you the job. [38:42] I'm sorry. I I should know all these [38:45] >> free I was thinking, [38:46] >> wasn't it? [38:47] >> I should know what these pay [38:49] >> pay is, but I just [38:51] >> starts at 2146 [38:54] and the range ends at 2980. [38:58] >> And does that go by qualifications to [39:00] get you more money? [39:01] >> Yes. [39:02] >> Okay. [39:03] >> Yeah. Like I said, if you're going to [39:04] take all that abuse, you should just go [39:05] down to McDonald's and make that. [39:09] » They'll list it to you down there. you [39:11] get the wrong order. Okay. [39:13] >> Um I guess maybe we could focus on [39:17] more ways that the customers feel heard [39:21] and that we're responsive to them. [39:24] >> I think you're doing a good job. [39:25] >> So do I. The bad thing is when the [39:27] customer is so mad you can't talk over [39:29] them, right? Because they're just [39:32] >> um So that position will be filled, but [39:35] we're having to wait another week before [39:37] we can go outside. [39:40] That'll be posted. [39:41] >> Okay, that sounds great. [39:43] >> And you thought we the four 10-hour [39:45] days, right? And all the holidays and [39:46] vacation, all that. But [39:48] >> Oh, yeah. [39:50] >> On the operations, I'll point out a [39:52] couple things. We have been, as you [39:55] know, continuing work on draining and [39:57] cleaning and inspecting the drinking [39:59] water storage tanks. Unfortunately, we [40:02] did run into a issue that I'll have uh [40:06] Steve and Trevor and maybe Don even [40:09] might provide his input with regards to [40:11] the painting system in the big tank over [40:14] here. [40:14] >> And when was the last time you told me, [40:17] Steve, when was the last time we painted [40:18] the inside of that tank? [40:20] >> Five years. [40:21] >> Has it been five years? [40:23] >> Yeah. 21. [40:24] >> Um what's happen is the top layer is [40:27] peeling off. [40:29] I don't know if you [40:31] >> I pretty well thought we repainted that [40:33] because the top was all corroded. [40:36] >> It was repainted. [40:37] >> Yeah, it 5 years ago it was repainted [40:40] and [40:41] >> and it's coming off now. [40:42] >> Yeah, it's failing. So [40:43] >> So who did it? We better get a hold of [40:45] them. [40:45] >> So that's where we can have Trevor and [40:48] Don maybe [40:49] >> what we've investigated, what we found. [40:52] >> I remember we had we went out extra for [40:54] that just because it was corroded. We [40:57] because of that. [40:58] >> Yep. The metal. [40:59] >> Yeah. As you can remember, these tanks [41:01] have periodically been taken down [41:03] >> and repainted. Sometimes they're touched [41:05] up. Sometimes a whole new systems put [41:07] in. [41:08] >> So, can you [41:08] >> This was a This was a new system. [41:11] >> We paid for sand blasting and repainting [41:14] that roof. I remember positivity. [41:16] >> We did. And that's this is the new [41:18] system that's filled. [41:19] >> And that isn't the tank that what got in [41:21] there, right? [41:23] >> So, what happened is is that [41:27] We sanded it down and then we put a [41:30] three to [41:36] » tan color and finish with a [41:40] shown evidence here is we've got problem [41:44] second and third coat. [41:46] >> So we don't have any rusting that's [41:48] occurring between the codes. It's just [41:51] >> it's laminating. [41:52] >> What we're trying to find out how [41:56] We can determine the magnitude of it. [41:58] But it does mean we're need to go in [42:02] and sand [42:05] profile so we can put another coat on. [42:10] >> I've never I've never seen that ever in [42:12] my career. We don't know yet what the [42:16] reason is. We're trying to scan the logs [42:18] to see if we have a temperature problem. [42:22] Did we have something that froze? [42:29] But it doesn't look like it's the entire [42:32] tank. Looks like it's on the north side, [42:36] but clearly our [42:40] emergency repair. [42:43] We don't need it down there because all [42:45] primer and the first coat on it is fine. [42:48] It's just our second coat. [42:52] peel off big sheets. It's just bizarre. [42:56] >> When was these When was these tanks [42:58] built? [43:01] >> I think they're in the 60s. [43:03] >> Yeah. But the whole question is he could [43:05] have had moisture on that between those [43:08] coats and he wasn't paying attention. [43:11] >> Yeah. They're also analyzing the paint [43:15] chips to see if the mix was correct, [43:18] which could potentially [43:19] >> mixes it and he probably didn't mix it [43:21] right [43:21] >> and that's so we're Yeah. part of the [43:24] investigation [43:24] >> for it. [43:25] >> Yeah. [43:25] >> Well, the company that did it in 21 is [43:29] out of business. [43:31] Um, Tenemic has been very helpful. [43:34] They're doing their analysis. Um, [43:37] they've made they'll make some [43:38] recommendations. Um, they have some [43:41] painters that we're trying to schedule [43:43] to have come look a little more. [43:45] >> That all we use is tiny meat because [43:46] there's other better ones out there. [43:48] >> Well, they were the ones that provided [43:49] the product for this volunteer. [43:56] » That's pretty neat. [44:00] » Well, I don't know if I agree that now [44:02] because Sher Williams has sure tried to [44:04] come up to speak. [44:05] >> I do agree with that. I do agree with [44:08] big strides. [44:10] So I think the concern is timing. These [44:14] tanks are critical to have online during [44:17] June, July, [44:19] >> middle of summer. [44:20] >> So we're going to have if we're going to [44:22] do it now, we're going to have to move [44:23] rather quickly. Uh if or we make the [44:27] decision to clean it up and then put it [44:31] back into service and do a repair later. [44:34] >> I don't think we want to do that. [44:35] >> I don't think so either. I think we just [44:37] need to do the emergency deal and get it [44:39] done because why go back through it? [44:41] Yes, [44:41] >> they just got to block it and don't let [44:43] any animals in the damn thing in [44:44] between. [44:45] >> Yeah, it's closed off. [44:47] >> When Matt called me, that was all he [44:49] said is, "Hey, I need you to come up to [44:51] the tanks. I got something to show you." [44:52] >> Oh, no. [44:55] >> Yeah, if you've got it down, there's no [44:56] reason, like Nick said, to not take care [45:00] of it right then. We don't want flakes [45:01] going out in the water and stuff. That [45:03] would be bad. [45:05] >> No. Um, so I think we'll move forward [45:08] then. We appreciate Dons. He's been [45:12] knowledgeable about these tanks for [45:14] almost as long as they've been there. [45:15] >> Don, do you have any idea? Don, do you [45:18] have any idea how long [45:22] >> Don, do you have any idea how old them [45:23] tanks are when they were put in? Cuz I I [45:25] keep thinking they were there when I [45:27] grew up. [45:30] >> Oh, [45:30] >> okay. Then they were there when I was [45:32] there. Okay. Growing up. [45:35] comment that I want to make is you go into these tanks [45:40] at least particularly these older ones [45:42] and we've got a lot of evidence for [45:45] corrosion but I can tell you once the [45:48] district [45:49] realizing [45:52] they [45:55] look at you see all this corrosion [45:57] district [46:00] since they repainted them and used the [46:02] system we use You know the team 25 years [46:06] out of it since we painted it the first [46:09] time. We really have got good service on [46:12] I got compliment history. They have [46:14] never hesitated once they recognize the [46:17] problem those tanks of them and we're [46:21] going to get a lot of them and I have [46:23] never in my career seen this type of [46:28] two. I've seen it between the seen other [46:32] systems but this particular epoxy. So, [46:35] this this is a first for me. [46:37] >> And Don, I I tell you, I've been around [46:39] them a long time. A lot of that coating. [46:42] We need to look harder at the people [46:43] that are doing the work. I I have a [46:46] feeling they This isn't the first time [46:48] they've had a problem. I guarantee you [46:50] >> that way. [46:50] >> Well, it's frustrating because all the [46:51] other tanks they did are in good shape. [46:54] >> Our exteriors are good. The They did the [46:56] inside of the other the smaller one [46:58] here, and it's great. It And like Don [47:01] said, it it's not the whole tank. It's a portion of it. So, there was [47:05] something that happened. [47:06] >> Well, it's it's not the company. It's [47:08] the guys actually not paying attention. [47:11] So, [47:11] >> they come and go. [47:12] >> Workers. [47:13] >> Yep. [47:13] >> Yeah. [47:14] >> Different crews, not [47:15] >> Yeah. [47:18] >> I want to take a second. I want to thank [47:19] Don though for being You've been here my [47:21] whole time and I want to thank you for [47:24] everything that you do. [47:25] >> Absolutely. [47:27] I've known Don for a few years, [47:30] >> not Don, but I remember those takes when [47:33] I was in high school or there. [47:35] >> Yeah. [47:35] >> I mean, in the 60s. [47:37] >> Yeah. Don's been uh involved in a lot of [47:39] the critical decisions that I think have [47:42] been great for the district like the [47:43] secondary water, the reuse, the master [47:47] planning and rates. Uh been instrumental [47:50] in helping guide us and done a great [47:53] job. Hey, I want to thank him for doing [47:55] such a good job bringing you up through [47:57] the ranks. Look where we're at now. [47:59] >> And Trevor. [48:03] » Yep. We owe him that, too. [48:08] » Sorry. Sorry. [48:11] >> He's been a good man, Don. [48:16] » All right. But uh only other thing I'll [48:19] highlight here is we did get the lease [48:20] agreement signed by the Great Salt Lake [48:23] Commissioner. [48:24] >> Hi. [48:25] >> So our canal shares 75% of those we're [48:29] going to lease to the [48:31] >> Great Salt Lake. And so [48:35] » you want permission from the board. [48:45] Um, [48:45] >> do you want to come back and be [48:48] approved? [48:48] >> Well, I think there's an item on the [48:51] agenda that could give us a little more [48:53] flexibility with that depending on the [48:55] estimated cost. [48:58] >> We're the board last time asked to raise [49:01] the limit for the general manager to be [49:04] authorized up to 100,000. Yeah. [49:06] >> So, if you think that that those repairs [49:09] would be below a h 100,000, which I [49:11] would be hopeful. [49:14] >> Um I think we could handle it that way [49:16] if that goes through. [49:17] >> Yeah, that sounds great. [49:18] >> So, maybe we address it at the end of [49:20] the meeting [49:22] >> uh during the other if that's okay with [49:24] the board. [49:24] >> Yeah, let's do that. [49:25] >> Um and then if you you can decide what [49:29] you want to do. [49:29] >> Sure. But that stays within [49:31] >> But I think that's a good point [49:33] >> because it stays within the scope of the [49:34] repair. So, let's let's go that way. [49:40] » Um, the other things I'll highlight, [49:43] wastewater operations. Just excited that [49:46] we're back to [49:48] putting that reuse water to use. Steve [49:50] and Dallas have been coordinating. I [49:54] think your plan is to start at the end [49:55] of March, 1st of April, right? [49:57] >> Yeah, that's what we're shooting for. [49:59] >> So, when will there be water in [50:00] secondary? [50:01] >> Probably April 1st at the latest. Yeah, [50:04] we're shooting for April 15th actually [50:06] be fully operational, but there'll be [50:08] water before that so people will start [50:10] seeing it might have questions, but we [50:12] want to do some aggressive flushing. [50:14] >> Okay, I'll tell them. [50:16] >> I'll tell them maybe. But not going to [50:18] guarantee anything. [50:18] >> Tell them to wait till April 15th to use [50:22] that. [50:22] >> We'll be flushing ahead of that. [50:25] >> Okay. [50:25] >> Uhoh. [50:28] >> Should be better than last year. [50:29] >> Yeah, it'll be a lot better. [50:30] >> Rugging out all them fish. No, there's [50:32] no fish. At least At least not in the [50:35] reservoir, huh? [50:36] >> Yeah. [50:36] >> No. [50:38] >> Um Dallas has been working on bids for [50:42] contracting out the sledge hauling um [50:44] when ET Technologies closes and moves. I [50:49] think he's got some promising numbers so [50:52] far. He'll continue to evaluate that, [50:54] but it looks like a potentially good [50:58] option to do the contracted hauling. [51:00] When does it have to start? When will [51:02] they actually be because I heard they're [51:04] already doing stuff out at the site? [51:06] >> Yeah, they said they're planning a soft [51:08] startup date of January 1, 27. [51:11] >> 27. Okay. [51:16] And then on the office, uh, LIL [51:19] completed a drinking water consumer fee [51:22] incentive verification survey. That's [51:25] will be the basis for that new drinking [51:27] water fee calculation. that we have to [51:30] pass along to the customer. [51:32] >> Yeah. [51:33] >> Um but again, if you remember, they've [51:36] cut down how much that will be and they [51:38] pushed it back. So [51:40] >> So it will now be 2028. [51:42] >> 2028 fiscal year. [51:44] >> Well, I think that's when the fee will [51:45] be due by us. So if that's [51:49] start collecting, [51:50] >> when will we know what number? [51:52] >> Are they going to wait the last minute? [51:54] >> I hope not. [51:55] >> It will be based on usage, right? [51:57] >> Yeah. The survey didn't really ask a [52:00] whole lot of questions. [52:01] >> It's based on us. Will it go in tiers or [52:03] will [52:05] >> it's just a [52:05] >> right now it's not planned to. [52:07] >> Yeah. It's just how much [52:09] >> flat fee on usage. [52:11] >> It will be up to us to decide how we [52:13] pass that along. [52:14] >> Okay. But I'm just wondering they will [52:16] give you a number that they have to have [52:19] >> and then you guys have to fit it in to [52:21] see how it fits in the system, [52:22] >> right? [52:23] >> When will we know that? Will we know [52:25] before 2028? Hopefully. [52:28] >> Yes. [52:28] >> Okay. [52:29] >> We should know. They'll use I think they [52:31] said they were using 2025's [52:34] data. So, we actually know I think now [52:36] we could get an idea. [52:38] >> Okay. [52:40] >> For that 2028 calculation. [52:43] >> All right. [52:44] And then [52:46] as far as coord communication, just a [52:49] heads up, I met with Jordan Valley, [52:52] their GM and Granger hunters, and that [52:57] Jordan Valley has that water budget [52:59] policy uh for [53:02] annexation, [53:04] new annexations, they have to meet a [53:07] certain water budget per acre or they [53:10] have to bring in their own water. [53:12] >> Oh, wow. [53:12] >> Okay. that's currently in place for [53:15] Jordan Valley. [53:17] So, they're moving that internal to [53:20] within their district now as well. And [53:24] so, they're talking with the districts [53:27] on how that will be implemented, but it [53:29] sounds like it would be a similar [53:32] budget. [53:34] Um, and they would ask [53:36] >> the drinking water budget. [53:37] >> Well, similar budgetary per acre amount. [53:42] They're just moving that inland now into [53:44] their existing district. So any [53:46] development within the district will be [53:49] when they pass this will be subject to [53:51] that budget. [53:52] >> Right. [53:53] >> So they'll have to bring water if they [53:56] want service from Jordan Valley. [53:58] >> Are we involved in that? [54:00] >> We are since we contract with Jordan [54:02] Valley. [54:02] >> Right. [54:04] >> And so it would affect us if we needed [54:06] to go to Jordan Valley for more water. [54:08] We need to go for more. [54:09] >> But if we don't, we're okay. [54:11] >> Okay. And right now, [54:13] >> right now it affects us less and it [54:16] affects Jordan or Granger Hunter less. [54:18] So they met with us together because it [54:21] will affect us the least out of all of [54:23] the agencies because we supply the most [54:26] of our water. But I think it's important [54:27] for the board to be aware that the [54:30] industry is moving that direction. [54:32] >> Okay. and we will likely need to be [54:35] aligning [54:37] um our budget policy in some time in the [54:40] future. So, okay. [54:44] And then we've got the golf course here [54:47] today. Um there's an agenda item uh for [54:53] the board to consider [54:55] their request. It is towards the end of [54:58] the [54:59] >> agenda. I want to move out of I want to [55:01] move out of out of uh [55:05] out of the direct what do I want to call [55:07] that? I I want to move I want to go move [55:09] off the agenda and tend to the golf [55:11] course stuff right now and then go back. [55:13] >> I that's all with my reports. [55:15] >> Is the council okay? I mean the council [55:17] is the trustees okay with that? [55:19] >> Okay, let's move over to the golf course [55:24] and that way they don't have to sit here [55:25] and listen to everything we have going. [55:27] Do you guys want to come up? [55:36] So that is under administrative [55:39] item two I believe. [55:41] >> Thank you Leo. [55:43] >> How are you doing? [55:48] » First off, this lady here that's in [55:51] front of us today, her her boy works for [55:54] us, Gavin Henshaw. [55:55] >> Oh no. [55:57] >> So [56:01] and [56:01] >> we're very very very fortunate to have [56:03] Gavin. [56:03] >> So all of these problems you can blame [56:05] her. [56:07] >> So Mr. Chairman, yes, [56:10] >> I'll introduce them and then Trevor [56:13] might provide a little context and then [56:16] we'll if the golf course would like to [56:19] uh make any comments. But as you know, [56:23] they have used a combination of our [56:26] drinking water and then water from [56:30] Kennott to water the golf course over [56:33] the years. and they have formally [56:37] approached Magna Water and the board to [56:41] consider some [56:44] combination of transferring over that [56:48] water [56:50] uh to Magna Water uh and the reuse [56:54] system now that we have. And so [56:58] the cleanest option is the first one [57:02] which is what they use to water their [57:05] drinking water greens, right? I mean [57:08] their greens [57:10] >> with drinking water. Um we feel like [57:13] that is a pretty good option and we [57:16] think we can make that work fairly [57:18] easily. the other the rest of the golf [57:21] course that they water with the kick hot [57:23] water. That's quite a bit of volume, [57:26] >> right? And it could be potentially some [57:31] substantial [57:32] capital costs. Um the golf course was [57:36] going to look into that to see what they [57:38] can do with their system and maybe [57:39] they'll be able to give us an update, [57:41] but they've requested us to consider [57:44] those two options. [57:46] um and any participation [57:49] that Magna Water District can consider [57:52] to help offset or delay cost uh to the [57:58] golf course, whether that's payback, [58:02] whether that's um donation of piping [58:06] materials, they have asked requested [58:08] that. Um and so I'll let Trevor, [58:12] anything else that you wanted to add to [58:14] that? Um just [58:17] the option one connection. We did kind [58:20] of a a cost estimate of what that would [58:23] take and kind of looked a little bit [58:26] more and revised that this week. Um [58:29] roughly I mean between we'll say 35,000 [58:33] to 50,000 to extend the pipe. Um, they [58:38] have a 4-in meter that they use for the [58:41] outdoor watering and then they have a 1 [58:43] in that goes to the clubhouse. That 1 in [58:46] would need to be uh basically a new [58:48] connection for that if they were to go [58:50] this route. Um, and so we've taken all [58:53] that into account. We kind of have a [58:54] really good grasp of what's required. [58:57] Um, but that's kind of the cost range [58:59] for that. [59:01] >> Okay. And they don't need to change the [59:03] 4 inch. They can live with them. I I we [59:06] have an option to you to put in uh what [59:09] is our standard 4-in vault. Um but I [59:13] don't believe that would be required to [59:16] make the connection to change it from [59:18] drinking water to secondary. [59:20] >> How big is the meter now that furnishes [59:22] it? [59:23] >> A 4 inch. [59:24] >> A 4 in. [59:25] >> And that wouldn't have to be increased [59:27] on secondary water to [59:29] >> not for the greens. [59:30] >> Okay. [59:31] So is that taken and bringing the line [59:34] over so it lines up and then like we [59:36] talked that day at the golf course. [59:38] >> Correct. [59:39] So a portion of that work benefits Magna [59:42] Water and I think something [59:44] >> I think that's something one of the [59:46] reason that the board could consider is [59:48] that the main in the road in front it's [59:52] in 2600 South [59:54] >> right [59:54] >> the bulk of the cost um [59:57] >> because we're going to eventually do it [59:58] anyhow right [59:59] >> it will be need to be done at some point [1:00:02] um so that's that's something for the [1:00:04] board to consider um we do usually put [1:00:08] the onus on development when it is in [1:00:11] this situation. They usually have to [1:00:13] front that cost if they want the water. [1:00:16] But but there are factors where like I [1:00:18] said, we benefit [1:00:20] uh some from that. So that's something [1:00:23] that you can consider. Um the second [1:00:26] option, we're still getting information. [1:00:30] I don't know if you've got enough. [1:00:31] >> We've done a lot of analysis. I don't [1:00:33] know that right here is the time and I don't have the figures but it they [1:00:39] it is a lot of water. It could be an [1:00:41] average of a,000 to 1,800 gallons a [1:00:45] minute um depending on when they're [1:00:47] using zones and which zones and how [1:00:49] many. Um so it is a significant amount [1:00:53] of water and so the infrastructure that [1:00:56] Clint mentioned is pretty significant. [1:00:58] It's an 8 to 10 inch pipe. It's a large [1:01:01] meter. Um, so I think that one still [1:01:05] needs to be fleshed out a little bit [1:01:08] more and the and there's an impact that [1:01:10] has never been on our system that would [1:01:14] then be be there [1:01:15] >> that needs to be evaluated [1:01:17] >> the impact of so are we incomplete at [1:01:20] this point to make [1:01:21] >> the option number two I don't think [1:01:23] we're at a point where we can make a [1:01:25] decision that that's [1:01:26] >> so out of the two when you're looking at [1:01:27] them both would you recommend one? [1:01:29] >> I would. Yep. 100%. [1:01:31] >> I think the number one benefits both the [1:01:34] golf course and NS long term. [1:01:37] >> Um would you guys like to add anything? [1:01:40] >> Yeah, I agree with that too. We want to [1:01:43] move forward number one. [1:01:44] >> Okay. [1:01:44] >> Like I'd love to have that done this [1:01:46] year. [1:01:47] >> Okay. [1:01:48] >> Both of us. Um [1:01:50] >> aside from that option number two, this [1:01:53] kind of goes I mean it's kind of off the [1:01:55] script, but we'd like to approach you [1:01:58] guys for [1:01:59] We're reaching our 100 year anniversary [1:02:01] this year and the coffee club is [1:02:05] probably the biggest green space in that [1:02:08] >> right [1:02:09] >> 70 plus acres of green space open. [1:02:13] I would like some help [1:02:16] maybe using the 100 year anniversary as [1:02:18] a starting point to reach out to other [1:02:24] entities for grant assistance. [1:02:28] the copper more sustainable when you're [1:02:30] talking about the amount of water we use [1:02:32] on the fairways. [1:02:34] The I don't know how old that system is. [1:02:37] It's not efficient and I'd like to start [1:02:42] >> and you could like do sections at a [1:02:44] time, right? [1:02:46] >> Absolutely. Absolutely. And you know if [1:02:51] using the macar is a great option there [1:02:54] with you guys to discover a better [1:02:56] option [1:02:57] >> something that's more [1:03:00] help. [1:03:03] » Well, you know what? I'm going I'm going [1:03:04] to just make a comment or two. I if the [1:03:08] number one option is feasible for them [1:03:11] and ourselves, I move that we we go [1:03:14] ahead, and go with option one and help these guys get this put in. And [1:03:23] >> what's the cost for option one? It's [1:03:25] right here between 20 uh between 35 and [1:03:29] $50,000. [1:03:30] >> Okay. [1:03:31] >> And that will like Clint said that will [1:03:32] actually benefit us too. [1:03:34] >> Where will that come from? [1:03:36] >> It ties [1:03:37] >> I I'm sorry. Did you make [1:03:38] >> We're talking about the option one where [1:03:40] it comes off 2600. [1:03:42] >> Oh, where did the where did the amount [1:03:44] come from? [1:03:44] >> What's the cost and who's going to pay [1:03:46] for it? [1:03:47] >> We are Well, there would be options for [1:03:50] the board to consider. could be um any [1:03:54] portion of that we could most likely do [1:03:57] that inhouse. [1:03:59] >> Um [1:03:59] >> as far as the extension [1:04:02] >> foot extension [1:04:03] >> so that estimate is [1:04:05] >> it's the 180 [1:04:08] >> that estimate is include is assuming a [1:04:10] contractor came and did that. Right. [1:04:12] >> Correct. [1:04:13] >> So there could be some savings in terms [1:04:15] of labor. So, you're probably looking at [1:04:17] half on the labor, right? [1:04:19] >> That could be passed on or could not be [1:04:21] for the board to consider. The other [1:04:24] option is they you could do a payback [1:04:28] agreement where the district would front [1:04:31] the money um and do the work, get it [1:04:34] installed, and the copper cup could pay [1:04:37] it back over time potentially with the [1:04:39] savings. Um, so there will be savings [1:04:42] when they use reuse water versus [1:04:45] drinking water. You could say, "Hey, if [1:04:47] you would pay what you've been paying [1:04:50] until that's paid back, that's an option [1:04:52] for the [1:04:53] >> They haven't agreed to that yet." [1:04:54] >> They haven't. Um, [1:04:55] >> that needs to be done before we can [1:04:57] approve. [1:04:57] >> But the question I have on that though [1:04:59] is if it's going to benefit us, I mean, [1:05:02] you got to you got to stop and take that [1:05:03] in consideration. It's not just benefit [1:05:05] the golf course, it's benefiting us. Am [1:05:06] I right or am I wrong? [1:05:08] >> Yes. The portion of the upsize in the [1:05:10] road benefits us [1:05:11] >> the 180 ft. [1:05:12] >> Yeah. [1:05:12] And is that 35,000 the extension? [1:05:16] >> No, that's a portion of [1:05:18] >> very portion of the cost because that [1:05:20] includes Yes. that extension of that [1:05:22] line. There's blowoff on the end. [1:05:24] There's the connection to the meter [1:05:26] vault. There's the 1 in meter. [1:05:29] >> So, we didn't have a we didn't actually [1:05:31] have a motion uh on this. We wanted it [1:05:36] to beformational for the board to give [1:05:39] us direction. If you wanted more [1:05:41] information, if you wanted us to come [1:05:44] back with more details on one thing or [1:05:46] the other, um, that was kind of the [1:05:48] intent here. Um, [1:05:50] >> so the only thing we'll motion on today [1:05:52] is to go ahead with option one, but they [1:05:55] still need to approve whatever you come [1:05:58] up with and so that we can then [1:06:00] >> So do we know what do we know when you [1:06:03] say it benefits us in so what's the [1:06:07] cost? [1:06:07] >> That's something we could come back [1:06:09] with. [1:06:10] >> Good. [1:06:12] >> When can you have all this stuff done so [1:06:14] we can have it back to us? Um, I think [1:06:16] the intent was you wanted something in [1:06:18] place before the start of your [1:06:20] irrigation. [1:06:21] >> Correct. [1:06:21] >> When when do you guys plan? [1:06:23] >> May 1st. [1:06:24] So, we could have it in the [1:06:26] April meeting. [1:06:27] >> Okay. [1:06:27] >> Um, and we would get close. I think [1:06:31] Steve, as long as your crews could have [1:06:33] that done [1:06:35] >> if that's what it's looking like we're [1:06:36] going to go to, then [1:06:37] >> we'll How long will it take to do that, [1:06:40] Steve? [1:06:42] Um, I'd probably plan a couple weeks. [1:06:46] >> Okay. Not over three weeks. That's only [1:06:49] 180 ft. [1:06:51] >> So, I think it's doable. [1:06:53] >> I say a couple weeks because you never [1:06:55] know what's going to happen. We might be [1:06:56] pulled off for sure emergency. [1:06:59] >> Sure. [1:07:02] But it's like I said, we need all this [1:07:05] put down and everybody agrees on what [1:07:07] it's going to cost and who's going to [1:07:08] accept. [1:07:09] >> You may get me back [1:07:10] >> certain things. [1:07:13] >> Okay, then I got it wrong because I [1:07:14] thought we were going to put I thought [1:07:15] we were going to run this ourselves. [1:07:18] >> Well, that's an option for sure. [1:07:19] >> I thought that's what we talked about. I [1:07:21] thought we was going to run it ourselves [1:07:23] and then they'll be liable for the rest [1:07:25] of the stuff. But I thought we my [1:07:27] agreement was is I thought we were going [1:07:29] to run it over there. We were going to [1:07:31] we talked about that that we were going [1:07:32] to do that and now it's all going to [1:07:34] come with this cost and this cost and [1:07:36] this cost. So I'm I'm kind of confused [1:07:37] about it. [1:07:38] >> Well, I think we talked we could get to [1:07:40] that point, but I think we talked about [1:07:42] the first step was they would come back [1:07:44] and formally [1:07:46] tell us what they wanted, [1:07:47] >> right? [1:07:48] >> And there [1:07:48] >> they want they want one [1:07:50] >> and they want both options, [1:07:52] >> right? [1:07:55] I mean obviously we wanted to benefit [1:07:57] both of us and I think both options [1:07:59] would [1:07:59] >> okay [1:08:00] >> we haven't flipped over both options up [1:08:04] so far you know the questions you've [1:08:07] been asking I haven't [1:08:10] >> at all I I've given you guys what we pay [1:08:15] Utah power to run our currently [1:08:18] >> I think it benefits [1:08:20] magma magma water to keep the resour [1:08:24] coming to Utah power resources meaning [1:08:29] >> and we're willing to you know we're [1:08:32] willing to pay that but I don't know how [1:08:36] >> we don't know [1:08:38] >> so do you guys have a count on how many [1:08:40] heads you've got and all that kind of [1:08:42] stuff [1:08:43] >> so when can you give that to [1:08:45] >> we we have that and we we've started [1:08:47] doing it doing an analysis and that's [1:08:50] where I mentioned that well I mean when [1:08:52] they're in their peak season, it could [1:08:54] be 1,800 gallons a minute that they're [1:08:56] watering. [1:08:57] >> So, is that is that what we base it on [1:08:59] for option two to come up with a number? [1:09:01] >> Correct. But that that full analysis [1:09:04] isn't done. The impact on our system, [1:09:06] what that cost might be, what what they [1:09:08] would pay monthly, we haven't got to [1:09:10] that point. [1:09:11] >> It's just like we find on an airline. [1:09:13] You walk into a place and you hear air [1:09:15] leaking all over what they pay for the [1:09:17] compressor cost. I have a feeling you [1:09:19] guys got a lot more leaks than you think [1:09:20] you do under that ground. [1:09:21] >> I agree with you. And that's and that's [1:09:24] where I would reach back out [1:09:28] and help us. We're operators, right? [1:09:30] We're both operators of this property. [1:09:33] We don't [1:09:34] >> right. [1:09:34] >> I can't for [1:09:36] >> right [1:09:38] >> there are many grants that suit our [1:09:39] needs as far as you know infrastructure [1:09:43] and water consery. There there grants [1:09:46] out there that we look at. [1:09:50] >> Could a cut apply for the grant? cop can [1:09:53] >> since they're the property owner. [1:09:55] >> It's they're the property owner you can [1:09:57] because [1:09:59] that's [1:10:00] >> so I got a question on that Nathan. So [1:10:03] under that deal with them the grant [1:10:05] there's a bunch of grants I understand [1:10:06] what it is I thing we dealt up here with [1:10:09] this project that we're working on right [1:10:11] now is [1:10:14] how you know cuz we're providing the [1:10:16] water right we're going to we were going [1:10:18] to provide the water and and like Jeff [1:10:20] said there's a lot of leakage he's [1:10:21] assuming there's a a bunch of leakage [1:10:25] how since Kakott owns the land how could [1:10:29] they get how could how could we put any [1:10:32] pressure on Kakott [1:10:33] to have them apply for these grants [1:10:36] because at the end of the day, Kennot [1:10:38] owns the land, right? [1:10:39] >> Yeah. And so there's a couple things to [1:10:40] keep in mind as and as I understand what [1:10:44] you're saying is what you're asking is [1:10:46] can the district or the city also put in [1:10:49] for grants because the city as the [1:10:51] district and the city as government [1:10:52] entities are going to be [1:10:53] >> they got a grant coming to us from the [1:10:56] city coming up. [1:10:57] >> Yeah, but that's that's something the [1:10:58] city's providing. [1:10:59] >> Right. Right. So Riotinto as the owner [1:11:01] could apply for those grant programs [1:11:03] that Riotinto as a private for-profit [1:11:05] company is eligible to apply for, but a [1:11:09] usually there's public entities have [1:11:12] other programs that are in addition or [1:11:14] separate to from what Riotinto could [1:11:16] apply for. So, it's not uncommon, this [1:11:19] is an odd situation, but for entities [1:11:22] that provide some public service to a [1:11:23] community that aren't eligible for a [1:11:25] grant to partner with the the entity [1:11:27] that is, which would be the district or [1:11:29] the city, to then have that entity apply [1:11:32] for the grant and pass it through to to [1:11:35] them. I assume you're a nonprofit [1:11:37] organization, right? [1:11:38] >> So, there's and that happens relatively [1:11:42] frequently. And so, yes, you could go [1:11:44] and work with Riotinto, but I think what [1:11:46] maybe makes the most sense is if you're [1:11:48] aware of grant programs that you're [1:11:50] interested in, give us a list because [1:11:52] some of those are things that Riointo [1:11:54] may be able to apply for that we can't. [1:11:56] But I think more than likely, [1:11:57] >> most of those are going to be things [1:11:58] that we could apply for that the city [1:12:00] could apply for that Riointo can't. And [1:12:02] so my thought is is let's see what's out [1:12:04] there and then maybe pass it over. [1:12:06] >> Yeah. Or you could sit down with Rio [1:12:08] Tinto and say, "Let's coordinate on [1:12:09] this. [1:12:10] >> What do we do? What's best for the Gulf [1:12:12] District? It looks like Riotinto. [1:12:13] There's some that you might be able to [1:12:14] apply through and pass to them and it [1:12:16] looks like there's some that we can. But [1:12:18] my guess is, and correct me if I'm [1:12:20] wrong. Most of what's going to be [1:12:22] available are things that you can apply [1:12:23] for that Rio Tinto can. Because a lot of [1:12:25] times with grant money, they're going to [1:12:26] be like, okay, a government entity gets [1:12:28] grant money. One of the richest [1:12:30] corporations in the world that has mines [1:12:31] all over the place. Why are we giving [1:12:33] public money to them? [1:12:35] And I think one of the things that could [1:12:38] tie that together, which is why option [1:12:41] two might be a little more complicated, [1:12:43] is there may be some partnership we can [1:12:46] make with Kakott over that pump station [1:12:49] itself. And so that's something that [1:12:51] we're pursuing as well. Um I think that [1:12:54] could be a win-winwin. Um so [1:12:58] >> because it's between the owner of the [1:12:59] property and the water company, right, [1:13:01] that could be really valuable. [1:13:02] >> Yeah. and then and then that could be an [1:13:05] asset to the district that we could then [1:13:07] in turn pass on uh the water and manage [1:13:11] that potentially. [1:13:12] >> That's two concerns I have with the golf [1:13:14] course. Number one, your quality of your [1:13:16] grass and your water leaks. Those are [1:13:18] the two biggest things. You really need [1:13:21] to look at that grass and if you're [1:13:23] using more water than you should be. I [1:13:25] think there's a lot of help out there. [1:13:27] Somebody needs to consider what grass [1:13:30] you have, what how much water it takes [1:13:32] and that's on and above besides all the [1:13:34] water leaks you have under the ground. [1:13:36] >> So, [1:13:37] >> well, that's what I'm saying. So, where [1:13:38] do we move from here? Do we have them [1:13:41] get a list? [1:13:41] >> Yeah. What I would recommend, and this [1:13:43] is not my call, but I would recommend [1:13:45] sounds like you've done some homework on [1:13:46] this, right? Provide I guess Clint or [1:13:50] whoever you guys designate a list of [1:13:52] what that stuff is so we can take a look [1:13:53] at it and see what makes sense. Now, I [1:13:56] will be clear. There are going to be [1:13:57] requirements. We'll need to have some [1:13:59] sort of a pass through contract. May [1:14:01] want to talk with Seth Oson with local [1:14:03] government's uh section of the state [1:14:05] auditors because there are some [1:14:06] reporting requirements. So, for [1:14:07] instance, anything over $25,000 that you [1:14:09] receive in public funds, whether it's [1:14:11] from us, the state or uh typically in [1:14:13] those different with federal government [1:14:15] grants too, there's there's reporting [1:14:17] there going to be mainly reporting [1:14:19] requirements on your ends, but if it's a [1:14:21] federal grant, potentially reporting [1:14:22] requirements on ours. Now that be said, [1:14:25] that being said, um there may be we may [1:14:29] need to work with Riotinto on this too [1:14:31] if with the ownership issue. It's just [1:14:33] each grant program is going to have its [1:14:35] own separate requirements and its own [1:14:36] separate eligibility criteria. [1:14:39] >> So what do we want to sit down? I mean [1:14:41] once he recognized what grants do we [1:14:44] want to sit down I mean bring them [1:14:45] through us or do we want to kind of sit [1:14:47] down and have a meeting with us and [1:14:49] kakott and just [1:14:50] >> yeah I would I would suggest that we see [1:14:52] what's out there first because you may [1:14:53] look at it and there may not be anything [1:14:55] that Riotinto can apply for. [1:14:56] >> Okay. [1:14:57] >> Or it may be that these are things that we can do but Riotinto needs to [1:15:01] sign off on it as the owner. So I think [1:15:03] it's premature to schedule anything with [1:15:05] Riotinto until we've seen [1:15:07] >> Okay. No, I was just asking how that [1:15:08] works. So, [1:15:09] >> and and I agree with you, Mick, as far [1:15:11] as that 180 foot extension down the main [1:15:15] street, which is in the city. Um, I [1:15:18] don't have a problem with that, but I [1:15:20] think we need to nail down the cost. [1:15:22] >> I I I can agree. I agree with that. [1:15:25] >> So, if what I'm hearing is we would come [1:15:27] back to the board with a next month with [1:15:30] a final cost. That would be the B what [1:15:34] Magna Water's participating in and what [1:15:37] we're providing. and then the cost that [1:15:39] they would need to be expected to pay [1:15:42] back. Is that Yeah. Is that a fair [1:15:44] >> That's what I was hoping because I don't [1:15:46] have a problem. Anything that goes in [1:15:47] the street, I don't I don't think we [1:15:50] necessarily need to push them on because [1:15:51] they're an existing customer, not that [1:15:53] it's a new facility where we, you know, [1:15:56] push that on as part of that. So, [1:15:59] >> how does that sound to the board? I I'm [1:16:01] a little different about that, but my [1:16:03] different is is if we're going to put [1:16:05] that if we got to run that line over, [1:16:07] why let's just put it in? [1:16:10] >> Well, I think we are saying we would put [1:16:12] it in. [1:16:12] >> We would put it in and then [1:16:13] >> but then the 4 in to their [1:16:15] >> Oh, no, no, no. I understand that part. [1:16:16] Okay. [1:16:16] >> That would be what they would be [1:16:18] responsible to pay back. Is that seem [1:16:20] reasonable? I think that's that's [1:16:22] >> and we could just have them pay back [1:16:24] materials [1:16:26] for that portion or we could have them [1:16:29] pay back labor and materials since if [1:16:31] we're putting that in. [1:16:32] >> So [1:16:33] >> bring it bring it back to board and then [1:16:34] we can make a decision on that. [1:16:36] >> We'll we'll make sure that those options [1:16:37] are all available in that cost [1:16:40] >> so that you could determine what com [1:16:43] combination works. Does that sound okay? [1:16:47] >> Yeah. I don't want to hold that up at [1:16:48] all. [1:16:48] >> Does that work with the golf course? [1:16:54] I really want to use this as a starting [1:16:55] point to build a partnership [1:16:58] >> right [1:16:58] >> with the board with water. [1:17:03] I keep talking about 100 years. It's [1:17:04] important it's important to [1:17:11] basis or starting pointy [1:17:14] project that we can apply for to ensure [1:17:16] that that stays down there. [1:17:21] » Well, like I said, this is how I feel. [1:17:23] I'm going to speak as the chair of the [1:17:25] board. I'm going speak as the mayor. Um [1:17:27] I don't want to see that golf course go [1:17:29] away. So, whatever we can do to help [1:17:30] sustain that golf course, if we lose the [1:17:33] golf course, you might as well say kiss [1:17:34] good Magna goodbye because that's all we [1:17:37] have out here that's ever stayed here. [1:17:40] And we'll work, you guys have worked [1:17:41] very hard to keep that. You run off a [1:17:43] shoestring [1:17:45] and u you know, so whatever I could do [1:17:48] at my end, I'm willing to you know, [1:17:52] again, I have people I answer to, too. [1:17:54] So, [1:17:56] >> but I want to see the golf course stay [1:17:57] too on that. [1:18:00] >> So, I I think we [1:18:01] >> wants to talk. [1:18:02] >> I think we can make a motion to move [1:18:04] ahead on option one if we need to. [1:18:07] >> I I agree. [1:18:08] >> But we also need to con continue with [1:18:11] option two and get the rest of the data [1:18:13] from the golf course [1:18:14] >> on option two because we have incomplete [1:18:16] data. [1:18:17] >> Right. I think we're I think we're [1:18:19] getting there on that. We just have the [1:18:22] analysis. It's so much more volume. [1:18:24] Yeah, [1:18:25] >> that it changes what we can do, [1:18:29] >> how we would approach that. Okay. [1:18:31] >> So, that's what's going to take a little [1:18:32] bit of time. [1:18:33] >> Well, if it is 1,800, that would make a [1:18:36] big difference over a,000. That's almost [1:18:38] double. [1:18:39] >> Yeah. [1:18:40] >> So, I don't know if they I don't know if [1:18:43] they have anything that [1:18:44] >> you can run across the ground that would [1:18:46] determine if there's a leak or something [1:18:48] in the line. turn. [1:18:49] >> I mean, all I know is you can shut the [1:18:51] valve off and see how long it takes and [1:18:53] it would probably like that. [1:18:55] >> Yeah. [1:18:58] >> Sound [1:19:00] >> It's It's a lot of water. There's [1:19:02] probably some leaks. I mean, you know, [1:19:04] you've got trees, it's mature, their [1:19:06] pipes been there a long time. [1:19:08] >> We just know in this ground, it doesn't [1:19:10] go to the surface. [1:19:11] >> A water leak doesn't go to the surface. [1:19:13] It goes in the ground. [1:19:15] >> Yeah. It goes down into that pipe right [1:19:17] where they need to get that all piped [1:19:19] in. [1:19:22] >> Okay, that is that's it. [1:19:24] >> Thank you you guys. Appreciate you. [1:19:26] >> Can I ask a question? [1:19:27] >> What is that? [1:19:28] >> This is Canox's property or whoever. If [1:19:31] it's a major improvement for their [1:19:32] personal property, wouldn't they be [1:19:34] interested in paying money to have [1:19:37] improved if it's an upgrade for their [1:19:39] property? [1:19:40] >> You know what? You would you would think [1:19:42] so, but unfortunately it doesn't work [1:19:44] that way. and we'll I'll give you detail [1:19:46] down the road. So, [1:19:48] >> they're they're really tight right now. [1:19:50] They're being very cautious what they [1:19:51] spend. [1:19:57] » I know. I I I Hey, I understand that. [1:20:00] >> They won't talk about that. [1:20:03] >> Thank you, [1:20:03] >> Mr. Chair. We have a motion on the floor [1:20:05] that [1:20:06] >> to continue option one. So, we just [1:20:08] >> the motion on the floor, option one. We [1:20:11] need a second on it. [1:20:13] >> Oh, sorry. Been motion second. All in [1:20:15] favor? [1:20:16] >> I [1:20:16] >> thank you. [1:20:28] » Okay, let's move on to engineering. [1:20:31] >> Okay, [1:20:32] >> let's move back to our regular bean. I [1:20:34] mean back to our on our agenda. [1:20:37] >> Thanks, chair and board. Um the [1:20:39] engineering report. Things to note. Um [1:20:43] the Influent pump station project uh [1:20:46] moving along well. The pumps, screw [1:20:48] pumps are in there. They're working on [1:20:51] some power things and then we'll be able [1:20:52] to grout those channels and we'll see [1:20:54] those spin. That'll be really really [1:20:57] great. Um they installed some large [1:21:00] manholes continuing to put in some of [1:21:02] that piping and the grit is moving along [1:21:05] well. Also a lot of electrical and [1:21:08] mechanical within the building. and then [1:21:10] also working on one of the grit [1:21:14] separators and the piping over to the [1:21:16] new grit building. [1:21:18] Um Hanes well number eight, we have that [1:21:22] out to bid right now. Um that and that [1:21:25] is strictly the drilling of that well. [1:21:29] Um the building, we're still working [1:21:32] with the EPA and that grant funding. Um, [1:21:36] and that'll be used solely for the [1:21:38] building, uh, the pump station itself. [1:21:40] So, we moved forward on the drilling of [1:21:42] that. The bids will be due on the 23rd. [1:21:44] We had a pre-construction meeting which [1:21:46] went really well or a pre-bid meeting, [1:21:48] sorry. Uh, went really well. There's [1:21:51] seems to be quite a bit of interest. [1:21:53] There's, I think, eight contractors that [1:21:56] have requested plans and specs and so [1:21:59] looking forward to to that bid opening. [1:22:03] um Westside Collection Project 1B. Um [1:22:06] the fiber optic conflict, we've got a [1:22:09] final design on that. Um we're turning [1:22:12] that over to BD Bush, who was a [1:22:14] contractor on that project to get us a [1:22:16] cost [1:22:18] >> to [1:22:19] >> BD Bush. [1:22:20] >> Oh, never heard. [1:22:22] >> They did the the collection piping [1:22:25] install. They have a separate bore [1:22:26] contractor, but they'll there'll be a [1:22:28] separate one for this also because it [1:22:30] has to be under UDOT's uh spec and one [1:22:33] of their contractor preferred [1:22:36] contractors. So, we'll have a number on [1:22:38] that I I believe by next month. [1:22:42] Um, [1:22:44] we change house. We do have 90% plans [1:22:48] that we'll start reviewing and we'll share some of that information [1:22:51] with you. [1:22:53] um zone 3 reservoir. Um there's a lot of [1:22:58] groundwater up there. Um didn't see a [1:23:01] lot in the geotechnical, but we're [1:23:03] seeing quite a few little bubble up [1:23:06] >> pit springs [1:23:07] >> areas. And so we've been chasing that a [1:23:10] lot, working a lot on on the drain [1:23:12] piping um to dry that up. Uh very [1:23:16] important for the constructibility and [1:23:18] longterm on that. Um they've they've [1:23:20] installed some of the 16inch pipe and [1:23:23] that was going well. Also, uh lead and [1:23:26] copper, that project is underway. [1:23:29] They're starting on 9100 South. Um [1:23:33] the they did some saw cutting and [1:23:35] investigation yesterday and today, and [1:23:37] they'll start replacing service lines on [1:23:40] our side um starting next week, Monday. [1:23:44] Um we've had a lot of good interaction [1:23:47] with the public. They seem to be [1:23:49] receptive of allowing us to replace [1:23:51] their lines. I think we have a couple [1:23:53] that have denied it, which is okay. [1:23:57] >> Really? I can't believe that. It's [1:23:58] weird. Why wouldn't you want your line [1:23:59] changed out for nothing [1:24:01] >> for yard displays? [1:24:03] >> Yeah. [1:24:04] >> One one of them has a lot of trees. He [1:24:07] really loves his yard and he doesn't [1:24:08] want anyone touching it. And [1:24:10] >> we do have them sign a waiver. [1:24:11] >> Yep. Exactly. And then we just have to [1:24:13] track it and we each year we have to, [1:24:16] you know, notice them and say, "Hey, you [1:24:18] should get this replaced." And then if [1:24:21] the home sells, we have to update, you [1:24:23] know, inform that new person, but [1:24:25] they're not eligible for us to replace [1:24:27] it in the future, which they understand. [1:24:29] >> We connect inside the house where the [1:24:31] main goes to. [1:24:32] >> It depends on what the material is [1:24:34] coming out. We're seeing a lot of them [1:24:35] are copper stubbed and then galvanized [1:24:38] to that. And so we'll replace up to [1:24:40] that. Some of them were we are going to [1:24:42] go inside. Um [1:24:44] >> I just wonder what you're going to find [1:24:45] inside. [1:24:46] >> It's [1:24:47] >> So what do you do when you hit a problem [1:24:49] like that? Do we write a letter and say [1:24:52] >> Well, the contract [1:24:54] >> the contract is to go into the shut all [1:24:56] the way to the shut off valve. [1:24:58] >> So we're covered that way. [1:25:00] >> Yeah. [1:25:01] >> Some of them don't have shut offs. [1:25:03] >> Some some of them have whatever wonky [1:25:07] valve they had at the time, too. So, [1:25:09] we'll end up improving some of that, [1:25:11] too. [1:25:11] >> Okay. [1:25:12] >> For them as part of this. And that's all [1:25:14] under the contract. [1:25:18] » That sounds great. [1:25:19] >> Um, and then yeah, the EDR just in [1:25:23] design there um for the finishing feed [1:25:25] and the master plan. We're moving into [1:25:28] our rate study analysis portion of that. [1:25:31] >> We can report more on that in the [1:25:34] future. But [1:25:34] >> yeah, [1:25:35] >> that's it [1:25:36] >> for now. [1:25:37] >> Thanks, Trevor. appreciate the report. [1:25:39] Thank you. [1:25:40] >> Okay, let's move on. See to your water [1:25:41] report. [1:25:42] >> All right. Thank you, board chair. So, [1:25:44] the culinary water production for the [1:25:46] month of February was 94.02 [1:25:50] million gallons or 288.56 [1:25:53] acre feet. And that's a 38% decrease [1:25:58] from February of 2025. [1:26:01] So far, year to date, we purchased 60.02 [1:26:05] acre feet of water from Jordan Valley. [1:26:08] As far as the call outs go, we've had a [1:26:11] total of 14 for the month. 10 of those [1:26:13] were on the water side and four were on [1:26:16] the wastewater side for a total of 45.5 [1:26:20] hours. 30 of those were water and 15.5 [1:26:24] ended up wastewater. [1:26:26] >> Steve, do we notice them lower in the [1:26:28] winter time than in the summer? [1:26:30] >> You know, it just varies. I mean, yeah. [1:26:33] >> So, temperature doesn't matter as [1:26:35] >> it it does. part in it, but it kind of [1:26:39] changes the calls from a different type [1:26:42] of call. So, [1:26:44] >> um like this month we didn't have any [1:26:47] main lines. Um we had one service line [1:26:50] and then the rest of them were pretty [1:26:53] much like for the water part anyways. [1:26:55] The rest of them were on the homeowner [1:26:57] side. [1:26:58] >> It seems like when we get really [1:26:59] extremely cold weather that seems when [1:27:02] everything shows up. [1:27:03] >> It Yeah, it does. I mean, [1:27:06] but at the same time during the summer, [1:27:09] the spring, fall, it kind of the [1:27:12] ground's shifting and we start to see a [1:27:14] lot then too. So, it just depends. It [1:27:16] varies. [1:27:18] Um, that's really all I have unless you [1:27:21] guys had any questions about any [1:27:22] questions about earlier. [1:27:24] >> No. Thank you. [1:27:26] >> Okay. Dallas. [1:27:27] >> Yes, sir. Mr. Chairman, I've got just a [1:27:29] couple things I wanted to go over. Um, [1:27:32] Mr. Dilly mentioned that we filed the [1:27:34] annual bioolids permit. Um that's an [1:27:37] annual report that we have to do to the [1:27:38] state. That just talks about how much [1:27:40] sludge we've hauled, how much chemical [1:27:42] we've used. Um there's two different [1:27:45] units that they look at that in 866 [1:27:48] drymetric tons. That's how we report it. [1:27:51] And the way we calculate that inhouse, [1:27:53] it was just over 14,45,360 [1:27:58] lbs for the year 2025. That's 440 loads [1:28:02] with no deficiencies reported. Um, [1:28:06] February operations are really stable [1:28:08] even with the fluctuating temperatures. [1:28:10] We've been able to walk the mix liquor [1:28:12] suspended solids concentrations in the [1:28:14] aeration basins down to about 2,000. Um, [1:28:17] that's going to be really good for us as [1:28:19] we move into April and May. We like to [1:28:21] operate between 1,800 and 2,000 during [1:28:24] the summer months. Um, so to be there, [1:28:26] that's a good head start for us. Um, [1:28:29] when I say operations are stable and [1:28:31] running well, I think the board's been [1:28:34] around long enough to know that there's [1:28:35] been some issues with ammonia in the [1:28:37] past. Ammonia is really stable. We're [1:28:39] getting good nitrification reliability. [1:28:41] Um, and everything's looking really [1:28:43] good. So, [1:28:45] um, the collections crew, [1:28:47] >> I got one question. [1:28:48] >> Yes, sir. [1:28:49] >> So, the ammonia thing, does it have [1:28:50] anything? We've had really good weather. [1:28:53] >> So, does that change when it's really [1:28:55] cold and the bugs are cold? really cold [1:28:58] is one factor in it. Um the mixed liquor [1:29:01] concentration if that gets too high and [1:29:04] then our our lack of air injection. So [1:29:07] um but when you balance all those out we [1:29:09] can get the we can keep the ammonia low. [1:29:12] So we've got a monthly permit limit of [1:29:15] seven but then we have a max daily of [1:29:18] 30. Um and we haven't been over a max [1:29:21] daily of three this year. Wow. [1:29:23] >> So we're we're doing really well. Um, [1:29:26] just an update on the collections crew [1:29:28] and some of the maintenance that they're [1:29:30] doing right now. They're working in [1:29:32] downtown Magna. They're on the 8800 [1:29:35] block below 3100 and they're kind of [1:29:37] working their way north and then over [1:29:39] towards that corner pocket of 84 and um [1:29:43] down there by Magnum Main Street. So, [1:29:46] and that's all I have, Mr. Chairman, [1:29:47] unless you've got any questions. [1:29:49] >> Nope, that's it. Thank you, Leo. [1:29:52] >> Thank you, chair board. Um, [1:29:56] the only thing I have to report that we [1:29:58] need to comply with by the end of this [1:30:00] month is our impact fee report. It's due [1:30:03] to the state auditor's office um on [1:30:06] March 31st. [1:30:08] Uh, wanted to also report the pretty [1:30:11] much final trial balance was submitted [1:30:13] to the auditors this week. So, Mick, you [1:30:17] just signed a auditor's engagement [1:30:19] letter, [1:30:20] >> right? They should be up and going [1:30:23] probably after I don't know when when [1:30:25] they have time but everything is [1:30:27] submitted to them [1:30:29] and that's my report unless you have any [1:30:31] questions. [1:30:32] >> You guys have any questions? [1:30:34] >> Good. [1:30:34] >> Okay. Thank you. Um so I guess we'll [1:30:37] move on. Andrew's left the room so let's [1:30:40] go to water and sewer availability. [1:30:43] >> Okay. [1:30:46] >> Go ahead. Just go ahead. [1:30:50] Okay, [1:30:51] first one here is uh SLCE 319 [1:30:55] development. [1:30:57] So this is uh let's see, I'm going to [1:31:00] pull it up on [1:31:03] GIS so we can see visually where this [1:31:06] is. Uh Ana Caroline Drive, uh Parkway [1:31:10] Boulevard, if you you know where the [1:31:12] Windco is over there. If you head north [1:31:14] along along that street [1:31:17] >> is that along the WCO road is right. [1:31:19] Okay, I know what you're talking. [1:31:20] >> Just keep heading north. 2400 south goes [1:31:24] over Mountain View and this is 2300 [1:31:27] >> under Mountain View. Right. [1:31:29] >> Goes over [1:31:30] >> over the top. [1:31:30] >> Goes over the top. [1:31:31] >> Oh [1:31:32] >> yeah. But just Yeah. give you an idea of [1:31:35] where we're at. They this this [1:31:37] development has purchased [1:31:40] parcels on both sides of 2300 South and [1:31:44] what they're planning right now is a a [1:31:45] single warehouse to the north. Um and [1:31:48] you'll notice in the letter that we [1:31:50] reference our water and sewer in 2300. [1:31:53] Still be to be determined if that's [1:31:55] remaining in initial con conversations [1:31:58] that would remain. Right now it's in [1:32:00] rightway. we would get an easement as [1:32:02] part of that. But as far as providing [1:32:05] water and sewer, we have sufficient [1:32:07] flows, fire flow, um, and capacity, and [1:32:13] we'd recommend providing water and sewer [1:32:15] service to this development. [1:32:18] Do you have any questions? [1:32:19] >> I don't. We just We need a motion on it, [1:32:21] right? [1:32:22] >> Yep. [1:32:25] » So, Mr. Mr. Chairman, make a motion [1:32:28] uh for SLC 319 development located at [1:32:32] 5750 West, 2300 South for sure and [1:32:36] water. [1:32:37] >> I'll second that. [1:32:38] >> A motion second. All in favor? [1:32:40] >> Okay, Trevor, I'll let you take the next [1:32:42] one and then we'll come back over to [1:32:43] Andrew. [1:32:44] >> Uh next one is Moody subdivision lot [1:32:46] number four. Um [1:32:49] if you recall there is we we had a [1:32:53] previous subdivision Moody Sillmaster. [1:32:56] Um and this is what that was was a [1:32:59] commercial development. They put in the [1:33:01] initial infrastructure with that [1:33:03] development and then they let the lots [1:33:06] were bare. Um and so as each of those [1:33:09] lots come in and develop, we're [1:33:11] evaluating what goes in there uh in [1:33:14] those connections. So this is lot number [1:33:17] four of that subdivision. We did lot [1:33:20] eight and nine. [1:33:21] >> So Trevor was one big lot and so then [1:33:24] they decided to subdivide it. [1:33:26] >> Correct. [1:33:27] >> How do we get the water and sewer? Do we [1:33:29] have to do a rightway to get to the back [1:33:31] lots? [1:33:32] >> So So when they did the overall [1:33:36] subdivision [1:33:37] >> Uhhuh. [1:33:38] >> we already had, and this is pretty [1:33:40] accurate, we already had water in here, [1:33:43] a water loop. Um, and they they ended up [1:33:46] putting in w a secondary and sewer back [1:33:49] into here. It's like a culde-sac. Um, [1:33:52] and then they stubbed out services to [1:33:54] each of these lots very similar to a [1:33:58] residential subdivision, but it's a [1:34:00] commercial one. And so when these lots, [1:34:03] all that main infrastructure is in. And [1:34:06] when these lots come in, then we know [1:34:08] what building type is going to be there. [1:34:10] And then we evaluate the service [1:34:12] specific to that to that building on [1:34:14] that lot. [1:34:15] >> So how many are still vacant then? [1:34:18] >> Oh, there's got to be one, two, three, [1:34:22] four, probably five. [1:34:24] >> Is there impact fees for each? [1:34:26] >> Correct. [1:34:27] >> Yeah. [1:34:31] » All right, [1:34:33] Mr. Mr. Chairman, I'd like to make a [1:34:34] motion for uh Moody subdivision lot 4 [1:34:38] located 2258 South Moody Drive. [1:34:42] >> I'll second that. [1:34:43] >> A motion second. All in favor? [1:34:45] >> I I [1:34:46] >> Okay, Andrew, I'm coming back to you. [1:34:47] So, I'm all over the place this morning. [1:34:49] Apologize. [1:34:49] >> You're okay. I apologize. I had to step [1:34:51] out. I had a multiple phone calls from [1:34:53] an employee and would need to make sure [1:34:54] it wasn't an emergency. So, everything [1:34:57] was okay, though. [1:34:58] >> Okay. [1:35:00] Um [1:35:01] so as you can see we have 35 of our 36 [1:35:05] positions currently filled here at the [1:35:07] district. Um some of the trainings that [1:35:10] we have coming up we have our uh our [1:35:15] bianual on-site CPR and first aid and [1:35:18] AED training coming up uh on the 23rd of [1:35:21] March. We have Jean Stock getting ready [1:35:23] to go to water efficient landscaper [1:35:25] training. Uh so he can care for our [1:35:28] gardens. It's through Jordan Valley. [1:35:31] >> Um it should be a good training. [1:35:33] >> Uh we have our team building coming up [1:35:36] in April for the second quarter and then [1:35:38] we have uh the fire department coming [1:35:40] out to do an on-site fire extinguisher [1:35:42] training with us at the end of April. Um [1:35:46] this month we're focusing on blood work [1:35:48] pathogens. It kind of coincides with the [1:35:50] first aid and CPR training. Uh so [1:35:53] everybody understands the risk that [1:35:55] they're taking on as they respond to any [1:35:59] emergency with first aid or CPR. Um got [1:36:03] some conferences coming up. Probably the next two that are coming up that are [1:36:07] going to be before the next board [1:36:08] meeting. Uh March 16th through 18th [1:36:11] water users in St. George. And then [1:36:14] March 21st through April 2nd, Utah GFAO [1:36:18] Le will be attending that. [1:36:19] >> Should be the 31st, not there. [1:36:22] >> That is a typo. Apologize. [1:36:24] >> That's That one's in St. George as well. [1:36:27] That's the government uh accounting [1:36:29] organization. [1:36:31] >> So, we've started the secession [1:36:33] planning. Um the managers went through [1:36:36] and filled out some information on where [1:36:39] they see the key positions are and needs [1:36:42] that are going to be coming up in future [1:36:44] years as well as some of the risks that [1:36:46] they're seeing. Uh right now we're in [1:36:49] the stage of the employees are filling [1:36:51] out a survey on positions that they [1:36:54] might be interested in filling and then [1:36:56] next week we'll start meeting with those [1:36:58] employees to uh align their goals with [1:37:03] the district goals. Um give them a [1:37:05] better understanding what what's going [1:37:07] to be available. Um and then lastly, [1:37:10] annual employee goals. We've wrapped [1:37:13] those up. We brought them to the board [1:37:15] to review. Um, we'll take any changes [1:37:18] that the board sees fit and then we'll [1:37:21] get started on them. [1:37:23] >> That's it for me, chair board. Thank [1:37:25] you. Is there any other questions? [1:37:26] >> On the uh April 22nd to the 24th, Jordan [1:37:30] Valley is putting that on. Is that [1:37:32] right? [1:37:33] >> Yes. [1:37:33] Correct. [1:37:34] >> And where will that be? [1:37:35] >> At their facility. [1:37:37] >> Yes. [1:37:38] >> Is any public invited to go there? [1:37:40] >> Um, yeah. I think anybody can do it. [1:37:42] landscapers, they they encourage [1:37:44] landscapers to get it so that they can [1:37:48] start performing those things here in [1:37:50] the communities when they go build [1:37:51] somebody's landscape. [1:37:53] >> So, is that make sure that the [1:37:55] contractors putting something in that [1:37:57] they could get a grant for, get [1:37:59] reimbured for? [1:37:59] >> I believe so. [1:38:00] >> That's what the whole thing is is for [1:38:02] qualifications. [1:38:03] >> Yes. We also have that class on the [1:38:05] 15th, April 15th here that Jordan Valley [1:38:08] puts on the local scapes class and [1:38:10] they'll go over a lot of that [1:38:11] >> for the public. [1:38:14] >> Who teaches the class there? [1:38:16] >> They do. [1:38:16] >> It's Jordan Valley. [1:38:17] >> Oh, they come here. [1:38:18] >> So, is that that's at night, right? [1:38:19] >> You don't get that. [1:38:20] >> What time does that stop? [1:38:21] >> 5:30. [1:38:22] >> April 15th. [1:38:23] >> How How long does it go for? [1:38:25] >> It's about an hour. [1:38:26] >> Okay. [1:38:27] >> We had a pretty good turnout last time. [1:38:29] We [1:38:29] >> We did. We'll be getting a flyer put [1:38:31] together and sent out. So, so that one [1:38:33] that he's talking about is geared [1:38:34] towards homeowners. This is a larger [1:38:37] course that's geared towards landscapers [1:38:39] themselves. And then there's a Yeah. And [1:38:41] then there's a exam that they have to [1:38:43] pass to show that they're qualified. [1:38:46] >> Oh, wow. [1:38:46] >> And then that they carry that [1:38:49] qualification. [1:38:51] >> Okay. [1:38:52] >> Well, thank you, Andrew. [1:38:53] >> Yep. [1:38:55] >> Okay. Let's move it on to the part uh [1:38:57] our project reward and agreement. Uh [1:38:59] Trevor. [1:39:00] >> Okay. [1:39:01] Thank you, chair board. First one here [1:39:03] is for JUB engineers. [1:39:06] Um, if you remember, they helped us with [1:39:09] design of Westside Collection project [1:39:12] number two. Um, [1:39:14] as they got done wrapping that up, I [1:39:17] believe they did a really good job, uh, [1:39:20] very thorough, um, responsive to our [1:39:23] concerns and our comments during that [1:39:26] design. and we had anticipated doing um [1:39:31] project number three design as well. So [1:39:34] I asked them to put together um this [1:39:38] task order um scope and fee for design [1:39:41] of Westside Coll sorry Westside [1:39:44] Collection project number three and [1:39:46] that's what this is for. [1:39:49] Um if you have any specific questions to what's in there um otherwise [1:39:55] >> is going to be on and above what's [1:39:57] already been approved or [1:39:59] >> so they did we we had already approved [1:40:02] um Westside Collection project 2 and [1:40:04] they and we took that to 95% because we [1:40:07] weren't going to bid it. So those specs [1:40:09] and and plans are complete. Um, and then [1:40:13] we wanted to move to designing project [1:40:15] number three, and that's where this [1:40:18] scope and fee is for. [1:40:20] >> So, Mr. Chairman, I'd like to make a [1:40:21] motion to approve the [1:40:24] JUB task order for Westside Collection [1:40:27] Project 3, design and bidding in the [1:40:29] amount of $190,200. [1:40:32] >> I'll second that. [1:40:33] >> Motion a second. All in favor? I [1:40:35] >> I [1:40:36] Trevor. [1:40:37] >> Thank you. Um, [1:40:40] jump back here. [1:40:43] Okay. Uh, we just talked about Westside [1:40:47] Collection. So, this easement is for [1:40:50] Westside Collection project number two. [1:40:53] There's a large portion of our existing [1:40:55] sewer. Um, I'll pull up a map here that [1:40:58] runs along Highway 2011 [1:41:01] along the south side between 8000 [1:41:06] west and 8,400 west. And as part of [1:41:10] project number two, we're going to [1:41:11] parallel that sewer line. It's this one [1:41:14] here. You can [1:41:15] >> What's the offset? [1:41:17] >> Offset. [1:41:18] >> Yeah. [1:41:19] It's roughly [1:41:21] it it differs a little bit but generally [1:41:24] around 30 ft of separation between the [1:41:26] two and that puts us a little bit [1:41:28] further to the south which essentially [1:41:31] all these parcels are kicott parcels. Um [1:41:35] primarily the existing line remained in the UD do rideway. um with our new [1:41:42] alignment, we're needing some easement [1:41:45] from Kennot for this new line. And so [1:41:48] that's what this easement agreement is. [1:41:51] Um we we have a pretty standard easement [1:41:54] agreement with Kakott that we've used [1:41:56] throughout the district over time. It's [1:41:58] changed a little bit. So we've gone [1:42:00] through this, reviewed it with them. [1:42:01] Nathan and I have both looked at this [1:42:04] and reviewed. Um and if you It gives us [1:42:08] the easement that we need for access. um [1:42:11] to maintain this sewer line. And if you [1:42:15] look at the last page in your packet [1:42:19] with this one, you'll see a cost [1:42:23] associated with that easement. [1:42:27] Keep scrolling. [1:42:30] >> You were able to cut that down a little [1:42:32] bit. [1:42:33] So in discussions with them um these are in their mind and according to [1:42:42] what they've been offered kind of prime [1:42:45] areas near 8,000 near 2011 and so [1:42:49] they've actually got some offers for [1:42:50] these properties that are quite high. Um [1:42:54] and they weren't interested in [1:42:56] negotiating the easement cost. [1:42:58] >> Well, [1:43:00] yeah, [1:43:00] >> it doesn't hurt to try. We're beholden [1:43:02] to that. We do need it. Um I you know [1:43:06] they're still fair in the respect that [1:43:08] they're they're looking at a 20%. [1:43:11] A lot of easements when people are [1:43:13] getting those they can be a lot higher [1:43:15] than that. Um so that equals out to $6 a [1:43:19] square foot. We've got 27,955 [1:43:23] square feet for a total of $167,730. [1:43:28] Um so as part of this you know uh [1:43:32] approving the going through with the [1:43:34] agreement it would also be to pay that [1:43:36] cost for the easement. [1:43:37] >> Okay. So that cost has to be associated [1:43:40] with that. [1:43:41] >> Okay. So um [1:43:45] Mr. Mr. Chairman, I'd like to make a [1:43:46] motion to approve the lease agreement [1:43:48] with Kennott or [1:43:50] >> the easement. [1:43:52] >> Oh, the easement agreement with Kennott [1:43:54] on Westside Collection Project 2, the [1:43:57] amount of 167730 [1:44:01] $167,730 [1:44:05] in motion second. All in favor? [1:44:08] >> K. Dallas. [1:44:08] >> Thank you. [1:44:09] chair and board. Uh we've got [1:44:11] today presenting the annual acoustic [1:44:14] assessment project um that we partnered [1:44:17] with RH Bordon. We're targeting this [1:44:19] year 250,000 linear feet or or just [1:44:23] under 50 miles of sewer pipeline. Um [1:44:27] I've got a picture of a map to kind of [1:44:29] talk through about how we're [1:44:31] prioritizing and targeting the system. [1:44:33] >> Wow. [1:44:34] >> Anything that's orange has been done and [1:44:37] we have a solid baseline on. We won't [1:44:40] redo that this year. Um, anything in [1:44:43] that main trunk corridor that's red, [1:44:45] yellow, and green, we'll target that [1:44:47] area specifically. Um, we no longer [1:44:51] assess downtown Magna. We know that [1:44:54] based on um, pipe conditions and roots [1:44:58] and stuff, we have to flush that twice a [1:45:00] year. So, we don't inspect that [1:45:02] acoustically. Um, and then on those main [1:45:04] trunk lines, we don't acoustically [1:45:06] inspect those. We did it initially to [1:45:09] establish that baseline and then get [1:45:11] these geo tags so that we can populate [1:45:13] these these uh base maps into our GIS [1:45:17] system. But really the [1:45:21] our our strategy is that center corridor [1:45:26] um that's where we spend most of our [1:45:27] time. These guys will come in and [1:45:29] they'll assess all of that. Um that [1:45:32] would take us over a year to do. They [1:45:34] can come in and help us out with that. [1:45:36] It gives it gives each section that's [1:45:39] assessed a grade from good to poor. If [1:45:44] there's anything that comes up that's, [1:45:46] you know, on a 1 to 10, five or less, [1:45:48] it'll automatically send us an alert and [1:45:50] we'll be able to go and target that [1:45:52] section specifically. So, um, [1:45:54] >> does that determine that determine leaks [1:45:57] or quality of the material? [1:45:59] >> It'll it'll detect any type of blockage [1:46:01] or flow restriction. [1:46:02] >> Oh, okay. That's all it is is for flow [1:46:05] or blockage. Yeah. Um it's been a great [1:46:08] service for us. So they're now you know [1:46:13] through your permit you have to inspect [1:46:16] your entire system x amount of times per [1:46:19] x amount of years. Um this is now an [1:46:22] approved inspection device. So if we run [1:46:25] through this with if we run this [1:46:27] equipment through our system, we can [1:46:29] check that box as an inspection. So, um, [1:46:32] >> so everything you've got green and red [1:46:35] now will be yellow by next year. [1:46:37] >> No. So, when you look at that, those are [1:46:40] the different grades that have come [1:46:41] back. So, X amount of our system is [1:46:43] green, which is a grade of seven or [1:46:47] higher. Anything that's yellow would be [1:46:49] seven to like four, and then anything [1:46:51] that would be red would be three to [1:46:53] zero. Um so if you see something that on [1:46:57] that inspection day um resulted in a red [1:47:02] section then we would go out immediately flush that and then it'll go [1:47:06] back to green. So it's just one way to [1:47:09] track and then we've got a dashboard [1:47:11] that we can layer the data [1:47:13] year-over-year so we can see how much [1:47:15] we're improving. Right now we've got [1:47:17] about 95% of our system is seven or [1:47:23] higher. Oh wow, that's good. [1:47:25] >> So, but without the data, we're just [1:47:28] guessing. [1:47:28] >> Um, but this is a this is using [1:47:32] technology to strategically maintain and [1:47:36] assess our system. [1:47:37] >> That's pretty cool. [1:47:38] >> Yeah. [1:47:39] >> So, I remember when they came up with [1:47:41] that saves a lot of men. [1:47:44] >> And what what we're asking for on this [1:47:46] contract, Mr. Chairman, is just uh [1:47:48] 64,500 [1:47:50] is the dollar amount. [1:47:54] Okay. [1:47:55] >> How many miles of pipe is that? [1:47:57] >> It's about 47.5. [1:47:59] >> Say 47. [1:48:04] » Okay. Mr. Chairman, I'd like to make a [1:48:06] motion to approve the annual acoustic [1:48:09] inspection services with RH Bordon [1:48:13] the collection system in the amount of [1:48:15] $64,500. [1:48:17] >> I'll second that. [1:48:18] >> In motion second. All in favor? Hi. [1:48:20] >> Hi. [1:48:21] >> Okay, Trevor, let's do the lease [1:48:22] agreement with Kakott. [1:48:23] >> Okay, [1:48:25] so water right lease agreement. Um, this [1:48:29] is for a kakott spring right uh 593198. [1:48:34] And right now we collect that water and [1:48:36] we put it in our zone 2 reservoir. [1:48:38] >> Um, and we've been doing that since that [1:48:40] reservoir was built um, 2021. And we do [1:48:44] an application or rather Kakott fills [1:48:48] out an application each year, a [1:48:50] temporary change application to allow us [1:48:52] to use that water. At the back in 21 [1:48:57] when we first started taking the water, [1:48:59] there was talk of a lease agreement. [1:49:01] There was a draft of it and it went [1:49:04] nowhere. Uh we don't truly know where [1:49:07] the hangup was. It seemed like uh [1:49:11] >> that's personnel changes [1:49:12] >> personnel changes at Kennott and it [1:49:14] slipped through, but um they reached out [1:49:17] to us several months ago last late last [1:49:20] year um talking about this lease [1:49:23] agreement. They wanted to get it back in motion and get it in place. [1:49:27] >> Is this a little creek that runs down? [1:49:30] >> We've piped it from within their [1:49:32] property and it goes makes its way over [1:49:35] to our reservoir. [1:49:38] Um, it was like 10 I want to say 10 [1:49:42] roughly 10 acre feet [1:49:45] a year. Um, it's not a tremendous [1:49:49] amount, but [1:49:50] >> what what I've been told like over the [1:49:53] winter time, you know, we'll lower the [1:49:54] level of our reservoir and it's full. I [1:49:59] mean, it's just a constant flow of [1:50:01] water. Um, [1:50:02] >> so maybe it's depending on how much rain [1:50:05] water we get. We've seen it fluctuate a [1:50:07] little bit. [1:50:08] >> Oh, really? [1:50:08] >> Um, we measure it every month and that's [1:50:11] how we report to Kakott that reports to [1:50:14] water rights. [1:50:15] >> Kennot probably has got a water right on [1:50:17] that water. [1:50:18] >> They do and they need beneficial use. We [1:50:20] provide that. So, with with all of that, [1:50:23] they would like a a lease agreement in [1:50:25] place. Um, [1:50:28] >> the right is 29 acre feet, but we we [1:50:32] have not seen it produce that much. Um, [1:50:34] like I said, around 10 acre feet each [1:50:37] year. Um, if you scroll through, what [1:50:41] this comes with is a cost to the [1:50:42] district. Um, and [1:50:47] the way it's structured here is year 1 [1:50:49] through five, which they want to go [1:50:51] retroactive back to 2021 through end of [1:50:54] 26. It would be $10 per acre foot. So 10 time 10 $100. I mean, we're $100. [1:51:04] cost us more to to write it up. [1:51:07] >> Yeah. [1:51:08] >> Um so it's it's a pretty in [1:51:11] insignificant amount of water. Um but [1:51:15] they would like this in place and [1:51:16] >> just trying to get credit for it, right? [1:51:18] >> Yeah. I think within their to be able to [1:51:20] lease that water and and have it [1:51:22] >> right. [1:51:23] >> Yeah. [1:51:23] >> Have it documented this way is important [1:51:25] to them. I [1:51:27] >> Well, they never want to be accused of [1:51:29] giving something away. I can think uh [1:51:31] back in the day that those guys grabbed [1:51:33] the water that was going down creek [1:51:35] that's been a plus for us. [1:51:37] >> Yeah. [1:51:37] >> Uh if the state would have got a hold of [1:51:39] that that could have been pretty bad. [1:51:41] >> Yeah. [1:51:41] >> And I think it actually helped us be [1:51:43] able to get it over in C7. Right. [1:51:46] >> Yeah. So, [1:51:48] um I I recommend [1:51:52] approving this lease and allowing us to [1:51:54] move forward with Kennot [1:51:55] >> the lease agreement. [1:51:56] >> Yep. [1:51:58] >> Um [1:51:59] So, Mr. Chairman, I make a motion to [1:52:02] approve the lease agreement with Kennoff [1:52:04] for Water Ride 59-3198. [1:52:08] » I'll second that. [1:52:09] >> Motion second. All in favor? [1:52:11] >> I [1:52:12] >> Okay, Trevor. [1:52:13] >> Okay, last one. [1:52:14] >> All on you. [1:52:16] >> Okay, this is a storm drain easement. [1:52:19] Um, we've discussed this in the past. Um [1:52:23] there's construction waste management, [1:52:25] the waste management company near the [1:52:27] wastewater treatment plant. Um their [1:52:30] intention is to reroute some storm water [1:52:33] that runs through their property so that [1:52:35] they can expand their waste site. And in [1:52:39] doing so, they've approached us for an [1:52:42] easement through a portion of a [1:52:44] wastewater treatment plant property [1:52:47] um over to take that, you know, pipe it [1:52:50] and move the storm water into um [1:52:54] what's that? [1:52:55] >> Kersy. [1:52:55] Yep. Kersy Creek. [1:52:58] >> Did they take out the reservation? Did [1:53:01] Are they the ones that marked this out [1:53:02] or did we mark that out? Another [1:53:04] >> us. So, so I'm in um Nathan and I are [1:53:09] still working through this um some back [1:53:11] and forth and but what I'm I guess what [1:53:15] I'm looking for here is um you know we [1:53:19] we've discussed providing this easement. [1:53:22] Um so just an approval to continue to [1:53:27] refine this agreement with with Nathan [1:53:29] and myself and and move forward with [1:53:32] them on providing the easement. One of [1:53:34] the things is that we've kind of had [1:53:37] some back and forth with them. First, it [1:53:40] sounded like it was an easement to [1:53:42] construction waste management and then [1:53:43] it [1:53:45] they provided something that had Magnus [1:53:47] City on it and that that made some, you [1:53:50] know, confusion on our end and I've [1:53:52] gotten to the bottom of it. What they're [1:53:54] working on with Magnus City is a storm [1:53:56] drain um like management agreement. So [1:54:00] this storm drain pipe would be owned and [1:54:04] managed by construction waste [1:54:06] management. It wouldn't be turned over [1:54:07] to any public agency and that's where [1:54:09] this agreement is with them um [1:54:14] specifically and not with any city or [1:54:17] >> other entity. [1:54:19] >> No. And we'll make sure that that that [1:54:22] agreement is you know we're not [1:54:24] providing an easement if that agreement [1:54:27] isn't in place. [1:54:28] >> Okay. [1:54:28] >> Does that make sense? So, [1:54:31] >> so Mr. Chairman, I'd like to make a [1:54:33] motion to approve the uh storm drain [1:54:36] easement agreement to be granted to [1:54:38] construction wast. [1:54:40] >> I'll second that. [1:54:41] >> Motion second. All in favor? [1:54:43] >> I [1:54:45] >> Okay, let's move on. Andrew Levolution. [1:54:52] » Um, you want to take that first one le? [1:54:56] >> Yeah, sure. Oh, so this is our [1:54:58] resolution 202602 [1:55:01] and it includes [1:55:04] basically [1:55:06] three changes to our ARRS. So the first [1:55:10] portion of the resolution is changing. [1:55:13] Sorry, let me get [1:55:14] >> section A. [1:55:16] >> 6.4. [1:55:17] >> Yeah. So the first one is isn't it the proceed or [1:55:24] purchases? [1:55:25] >> Yes. [1:55:25] >> Yeah. Okay. So, it takes uh Clint's [1:55:28] authorization from 50 to 100,000 um that [1:55:31] was recommended by the board last month. [1:55:34] >> And then the following B letter B [1:55:37] through F I believe has to do with um [1:55:40] >> the new junior executive [1:55:42] >> adding our junior executive [1:55:44] classification in the AR and are where [1:55:46] it's applicable. [1:55:48] >> Just can I speak to that? So, so most of [1:55:51] the changes to the junior executives are [1:55:53] in addendum E of the AR&Rs and that's [1:55:55] the addendum that goes over all of their [1:55:57] benefits, but we also needed to make [1:55:59] some conforming changes throughout other [1:56:01] sections of the A&R. So, this is kind of [1:56:03] structured just sequentially with the [1:56:05] numbers of your section, but [1:56:07] categorically we're increasing Clint's [1:56:09] purchasing threshold. [1:56:10] >> Then the rest of these changes are [1:56:12] dealing with just junior executive [1:56:14] stuff. So it's it'll look weird as you [1:56:16] go through because we're saying we're [1:56:17] adopting the attached version of Adende [1:56:19] and then we're amending all these other [1:56:20] sections. And then the third category [1:56:22] and I'm just beating Lelay all to the [1:56:24] punches [1:56:25] >> is to make our language consistent with [1:56:27] the three tardies policy that you had. [1:56:29] We had some inconsistency in the AR. So [1:56:31] using the same term [1:56:33] >> and that's all that this resolution [1:56:35] does. [1:56:36] >> I sorry I figured that would be easier [1:56:38] than going through like nine different [1:56:39] lines of technical legal changes. [1:56:42] >> Thank you. [1:56:44] That looks good. [1:56:45] >> So, we have to uh we have to um approve [1:56:48] it, right? [1:56:49] >> Yeah. So, what'll happen is is the way I [1:56:51] drafted this resolution is if this is [1:56:53] acceptable to you, you'll approve it and [1:56:55] then we will then implement these [1:56:57] changes to the AR&Rs which will be easy. [1:56:59] We'll have to update the you know [1:57:01] pageionation and things like that and [1:57:02] then we'll get it uploaded. [1:57:03] >> Yeah, that makes it good. And one of [1:57:05] those forms that you signed, Mick, kind [1:57:07] of prompted this because, [1:57:09] >> right, [1:57:09] >> our APA benefits that administers the [1:57:12] benefits, [1:57:13] >> right? [1:57:14] >> One of this signed and approved. So, [1:57:18] >> so, Mr. Chairman, do I want to make a [1:57:20] motion? [1:57:20] >> Yes. [1:57:21] >> Mr. Chairman, I'd like to make a motion [1:57:22] to approve resolution 2026-02, [1:57:27] approve the changes to the district's uh [1:57:30] A&R as outlined in in that resolution. [1:57:34] I'll second that [1:57:35] >> in motion second. All in favor? [1:57:37] >> I [1:57:39] >> Okay, we don't need to do number two. [1:57:41] We've already had that discussion [1:57:43] information discussion only. No, no [1:57:46] action. Nathan, do you want to give an [1:57:47] update on the legislation? [1:57:50] >> Yep. I know this is your favorite part [1:57:51] of the meeting in the year. Um, so I've [1:57:55] got a few bills. I'll go through them [1:57:57] quickly. The first is HB147. that's [1:57:59] going to require all government entities [1:58:01] to provide an option for people to [1:58:03] submit any forms or permit applications [1:58:06] or things like that electronically. [1:58:09] So, I mean, we can have the form and [1:58:11] they can fill it out. There just needs [1:58:12] to be a way that they can submit it [1:58:13] electronically. Um, I think that's [1:58:16] already kind of happening via email, but [1:58:17] now it's so I don't think that's going [1:58:19] to be a big deal. Um, another one that actually may be important for you [1:58:23] is HB296. [1:58:25] What that does is it allows for water [1:58:27] that is being leased or provided to the [1:58:30] Great Salt Lake, which you were doing, [1:58:31] to be included in your 40-year plan, [1:58:34] which is the topic of another bill that [1:58:35] I'll get to. But essentially, with with [1:58:38] public entities like you guys, you can [1:58:40] hold your water rights without [1:58:42] perfecting them for a period of 40 [1:58:44] years. And during that time, you're [1:58:45] entitled to get any extension that you [1:58:47] want. Once you hit 40 years, then the [1:58:49] state's like, "Okay, you know, we don't [1:58:51] want you just to hoard water. You've got [1:58:53] to have a plan showing how you're going [1:58:54] to use it for the next 40. Actually, I [1:58:55] think it's 50 years and then you have to [1:58:57] show how it's going to be used for the [1:58:58] next 40. [1:58:59] >> So, if we have a plan, we're okay. We [1:59:01] can even roll it over after [1:59:03] >> it just the So, the point is is our [1:59:05] state's water laws are intended to [1:59:07] ensure that people actually use the [1:59:09] water and they're not hoarding it. [1:59:10] >> So, public water suppliers are a little [1:59:12] different. So, for instance, if we were [1:59:14] to go out and prove up all your water [1:59:15] right now, the state engineer would just [1:59:17] give you a certificate for what you're [1:59:19] using right now, not for what your water [1:59:21] rights are approved. And so for a [1:59:22] growing community like you guys, you [1:59:24] have a lot of water that you have on [1:59:26] standby that isn't being used yet. [1:59:28] That's the intent here. But the [1:59:30] legislature or the state at the same [1:59:32] time, it's like, okay, you've had this [1:59:34] water, it's been approved for 50 years. [1:59:36] Like, are you going to need it or not? [1:59:37] You got to show us a plan that there is [1:59:39] an actual chance it'll be used in the [1:59:41] next 40 years. What this does is it says [1:59:43] that if you're leasing water to the [1:59:44] Great Salt Lake, that counts as part of [1:59:46] your 40-year plan. So otherwise, absent [1:59:50] this bill, if we continue to lease water [1:59:52] the Great Salt Lake, they could say, [1:59:53] "Well, you're not using that water, and [1:59:55] that doesn't qualify." [1:59:57] >> Excuse me. [1:59:58] >> So, does this account also for [2:00:00] groundwater, well water? [2:00:01] >> Yeah. But well, what this bill does is [2:00:03] any water right that you're leasing, [2:00:05] which is almost always surface water. [2:00:07] People aren't leasing groundwater the [2:00:08] lake, but it it I don't think it's [2:00:10] limited to surface or groundwater. So, [2:00:11] the point is is that and we we we're [2:00:14] going to have to do a 40-year plan under [2:00:15] another bill that I'll get to in a [2:00:16] second, but when we do it, we can [2:00:18] include those shares. So, the next thing [2:00:21] is um HB 319. Uh this, I think, is a [2:00:25] good bill. It provides a process by [2:00:26] which we can have electronic notary [2:00:29] documents be filed with the the the [2:00:31] county. Um it's not mandatory, but it [2:00:34] provides an option by which the county [2:00:36] recorders can allow that. So, that makes [2:00:37] it a lot easier if we can do electronic [2:00:39] notoriization instead of having people [2:00:41] come and physically sign. We'll see what [2:00:42] the county recorders want to do. Um, [2:00:45] there's some grammar changes. HB325 is [2:00:48] one we'll need to go over those. Um, [2:00:52] there's another bill, HB349, that comes [2:00:55] it provides a new process by which you [2:00:57] can apply for money from the Board of [2:00:59] Water Resources to help increase [2:01:00] reservoir capacity. I know you have a [2:01:02] few small ones there. Um, [2:01:06] there was a big bill that we talked [2:01:07] about, HB501. This was the bill that was [2:01:10] going to essentially require local water [2:01:12] providers to impose a a local income tax [2:01:15] essentially to help fund infrastructure [2:01:18] projects. It was modified several times, [2:01:20] but as we estimated, I think it was [2:01:21] going to be what, $1,400 a year per [2:01:23] connection. That bill ultimately did not [2:01:26] pass at the last minute. Um, was kind of [2:01:28] watching that till the end of the day. I [2:01:30] do expect we're going to see something [2:01:32] similar. My recommendation to rural [2:01:34] water and to um the UASD and the water [2:01:38] communities in general is the water [2:01:40] community needs to come up with a [2:01:41] proposal uh because to be fair to the [2:01:44] legislature they are trying to fill a [2:01:45] huge gap in the federal funding that [2:01:47] we're no longer getting and it's an [2:01:49] issue that needs to be addressed and if [2:01:50] the water community doesn't come up with [2:01:52] a way to fund it then the legislature is [2:01:53] going to keep coming up with proposals [2:01:55] we may not like. Um the other one uh [2:01:58] there is a new bill HB535 that comes up [2:02:00] with a new process by which a public [2:02:03] entity has to follow before they can [2:02:04] dispose of property. So for some of the [2:02:06] properties we've acquired if we ever [2:02:07] wanted to sell them. But the long and [2:02:09] short of is we have to go through a [2:02:10] 45day notice period so people have an [2:02:12] idea that we're selling it. [2:02:14] >> Um perhaps the the the biggest bill [2:02:16] that's going to require us to do things [2:02:18] is SB284. Each year the legislature has [2:02:21] a very large land use bill that is [2:02:23] passed that isn't typically targeted at [2:02:25] water but often has uh tangential [2:02:28] impacts and and that bill usually passes [2:02:31] at the very end of the session. That was [2:02:33] the case here. This was SB284. It was [2:02:35] passed at 11:45 [2:02:38] on Friday, so 15 minutes before the end [2:02:40] of the session. Um so what it does is it makes detached ADUs a permitted use. [2:02:47] Um, we and I think we're going to have [2:02:49] to sit down and figure out to change our AR&Rs on how to deal with that. We [2:02:53] had some language years a couple years [2:02:55] ago where it allowed basement ADUs to [2:02:57] basically be a permitted use. So, um, [2:03:01] that's that was something we'll need to [2:03:03] work with. And the other one is what I [2:03:05] said before, and that is if a water [2:03:07] provider is requiring a water exaction, [2:03:09] which has typically been a a water [2:03:12] dedication, you have to have a 40-year [2:03:14] plan that I discussed before in order to [2:03:17] do that. And you have to have that in [2:03:18] place by January 1st, 2028. And [2:03:21] technically, the way the bill's drafted [2:03:22] is you have to have it we we all need to [2:03:24] do it if you're a culinary water [2:03:26] provider. And I do we have a a 40-year [2:03:29] plan? [2:03:30] >> Yeah. [2:03:31] >> So, we already have one. we're probably [2:03:33] in good shape. It may we may want to [2:03:35] update that now to include the water [2:03:37] that we're leasing to the Great Salt [2:03:39] Lake. And there were other some some [2:03:40] other Great Salt Lake bills that um [2:03:44] allow for water to be like for instance [2:03:46] if we wanted to add the Great Salt Lake [2:03:48] as a permanent place of use for your [2:03:51] shares. So, you know, that that's [2:03:53] another option now. So, you wouldn't [2:03:55] have to necessarily use it all the time. [2:03:57] It would just be there for for leasing [2:03:59] when it's available. So that's [2:04:01] essentially my report unless you have [2:04:02] any questions. [2:04:04] >> Cool. [2:04:04] >> Thanks, Nathan. [2:04:07] We're all done now up there for right [2:04:08] now. [2:04:10] >> Yeah. Just it'll just take us another [2:04:12] couple months to implement it all. [2:04:14] >> This is this large amount of the most [2:04:17] bills they [2:04:18] >> every year is the most they have. So [2:04:20] they broke a record last year. They had [2:04:21] over a thousand bills this year. There was legislation by Representative [2:04:25] Oerlin to limit the number of bills that [2:04:27] the legislature can have, but it didn't [2:04:29] make any progress. He's a new [2:04:30] representative, and his argument was [2:04:32] we're introducing so many bills, we [2:04:34] can't review them or vet them or process [2:04:36] them appropriately. But I I there's it's [2:04:39] just a it's a the [2:04:43] end of January through first week of [2:04:45] March is just a it's a marathon. [2:04:47] >> Were there bills they tried to pass that [2:04:49] was out of the time limit? There was I [2:04:53] think one bill that there's a question [2:04:55] on that and I think they ultimately did [2:04:57] determine that it was outside of the the [2:05:01] time limit and that was one that [2:05:02] Representative Tusher ran to create a [2:05:06] process by which um [2:05:09] people in a first class county which is [2:05:11] basically only Salt Lake County at this [2:05:13] point where they could divide it and I [2:05:14] think his his motivation wasn't to force [2:05:16] a split of Salt Lake County but to give [2:05:18] Westside interests an ability to split [2:05:21] with the county if they wanted to, but [2:05:23] that I think passed just like a couple [2:05:26] seconds after midnight. So, I I think [2:05:28] that was one that they ultimately ruled, [2:05:30] don't quote me, that it didn't pass in [2:05:32] time. Um, [2:05:33] >> you don't know if it passed or not. [2:05:35] >> Well, I know it passed. I just think it [2:05:37] passed right after because they're they [2:05:39] have so many things they are working [2:05:41] like they're moving and then midnight [2:05:43] hits and they just got to [2:05:45] >> the coach turns into a pumpkin and it's [2:05:47] done. Yeah. [2:05:48] >> Is that the one where they can make a [2:05:50] county within the city? [2:05:52] >> No. [2:05:53] >> That was divided up, right? [2:05:55] >> Yeah. Well, it was a process. What what [2:05:57] he was trying to do is not force a [2:05:59] split, but just say, "Hey, if if you're [2:06:00] in a county of the first class and you [2:06:02] think it's too big and you want a [2:06:04] smaller county, here's the process you [2:06:06] go through to split into two." [2:06:08] >> How long does that process take? [2:06:09] >> I I don't know. The bill didn't It [2:06:12] passed, but it's not going into effect [2:06:13] because it didn't pass it. [2:06:14] >> It'll probably come up next year now. [2:06:16] >> Yeah, it'll come up next year. And one [2:06:17] of the ones that I really like the most [2:06:19] too is the charter schools don't ain't [2:06:22] equal with the public schools. So when [2:06:24] the public school sells the land, they [2:06:26] they're not equal with us. We have we um [2:06:30] the public schools um don't have to have [2:06:33] I mean we don't have to give the charter [2:06:35] schools, you know, first. They follow [2:06:38] under the city and that for whenever [2:06:41] they're selling. [2:06:42] >> So yeah. So that bill was so right now [2:06:45] certain municipalities that have a [2:06:46] population density of over 3,000 people [2:06:49] per acre have a first right of refusal [2:06:51] if a school district sells property [2:06:53] within their boundaries. Magna doesn't [2:06:56] currently meet that because your density [2:06:58] isn't that high. But what this bill was [2:07:00] going to do initially it was going to [2:07:02] give um charter schools that first rural [2:07:06] the league and and Mick and Karns Magna [2:07:08] and others pushed back on that. Holiday [2:07:11] and I think a couple other cities and we [2:07:13] were able to get it to be kind of a [2:07:14] co-equal thing for every city. So every [2:07:17] city would have a co-equal uh approach [2:07:20] with the charter schools regardless of [2:07:22] population density. But then the bill [2:07:24] ultimately didn't pass. So [2:07:26] >> are we going to see a lot more charter [2:07:27] schools popping up now? [2:07:29] >> I I the state's very pro-charter [2:07:31] schools. So I think we have and I think [2:07:33] we will continue to see them. I don't [2:07:35] know if you'll see them. Um, [2:07:38] usually usually charter schools in my [2:07:41] experience seem to be proposed by [2:07:42] developers in places where there isn't [2:07:44] an existing school. And so here where [2:07:46] you already have pretty good coverage [2:07:48] and you have a brand new school, it [2:07:50] seems unlikely that there would be a [2:07:51] need. But then you have concerned [2:07:53] parents that just want to have a charter [2:07:54] school that deals with specific things. [2:07:56] So [2:07:56] >> I I don't know if you'll see any in [2:07:58] Magna, but I think you'll probably see [2:07:59] charter schools continue to pop up [2:08:01] throughout the state. How do they g how [2:08:03] does how does the public gauge how full [2:08:08] I I'm assuming if a charter school is [2:08:10] filling up pretty fast? Of course there [2:08:13] again gender I mean kids move on get [2:08:16] older and then they go to high school [2:08:17] whatever but uh how do they gauge the [2:08:21] how crowded the the charter school [2:08:24] becomes? I mean if it gets real crowded [2:08:25] do that oh we better build another one [2:08:27] or [2:08:28] >> Well charter schools are I I'm not a [2:08:30] charter school expert. I'll find it [2:08:32] through. Tell me if I'm right or wrong. [2:08:33] It's pretty much developers that are [2:08:35] building these charter schools. [2:08:37] >> Yeah, but not always. You know, where I [2:08:39] live in Daybreak, you know, we've been [2:08:40] there for almost 20 years and we were in [2:08:43] the old section and the parents there [2:08:44] started their own, which is still there. [2:08:46] But I think the difference between a [2:08:47] charter school is charter schools kind [2:08:49] of have an admissions process. They're [2:08:51] not required to take everybody the way a [2:08:53] public school does, right? [2:08:54] >> So, if you want to have your kid in a [2:08:55] charter school and charter schools [2:08:57] aren't aren't um service area specific. [2:08:59] So for instance, Cypress, people that [2:09:01] live within Cypress's service area go to [2:09:03] that school. But if you go send your kid [2:09:05] to a charter school, they can that [2:09:06] charter school can be anywhere and the [2:09:08] kid can go there. So charter schools [2:09:10] have a little bit more of a say over how [2:09:12] many people they accept and will control [2:09:14] over crowd. [2:09:16] >> I like the school district. [2:09:17] >> You may have to even apply for charter [2:09:19] school. [2:09:19] >> You do have to apply to charter schools [2:09:20] and a lot of them only have so many. So, [2:09:22] the one I mentioned in my neighborhood, [2:09:24] my kids never went there, but it's a [2:09:26] pretty competitive process to get in [2:09:28] because there a lot of people that want [2:09:29] to go and there only so many spots each [2:09:31] year. [2:09:31] >> Wow. [2:09:31] >> It it's public schools that have the [2:09:33] overcrowding issue because they have to [2:09:34] take everybody. [2:09:37] >> And you know, the problem that I had [2:09:39] about u them being equal with us. I've [2:09:42] lived out here my whole life in Magnum. [2:09:44] I paid school district taxes, right, for [2:09:46] the high the old high school and [2:09:47] everything. So why should the why should [2:09:49] the charter still be able to come in and [2:09:51] be able to take that school over and we we have lived out here and we've paid [2:09:56] taxes for that school all these years. [2:09:59] >> So I think that and and this isn't my [2:10:01] argument but I think that where the [2:10:03] legis where Representative Peruchi who [2:10:05] ran that bill was thinking is that [2:10:08] charter schools are also funded with [2:10:09] public taxes too. um and that it's a lot [2:10:13] cheaper if they're a public entity as [2:10:15] well to just acquire and use an existing [2:10:17] building rather than having to build a [2:10:18] new one. [2:10:20] >> So that that I think was the what they [2:10:21] were thinking. [2:10:24] >> Well, thank you for the update. So our [2:10:26] next board meeting is going to be April [2:10:28] 9th, 2026 at 10 a.m. here. [2:10:32] Uh we are in need of a close um a close session. [2:10:40] So if someone wants to make a motion to [2:10:43] close the open meeting. [2:10:45] >> Mr. Mr. Chairman, I'd like to make a [2:10:46] motion to take a brief recess and [2:10:49] immediately following meet and close [2:10:51] meeting to discuss the purchase, [2:10:53] exchange, lease of sale of real [2:10:55] property, including any form of water [2:10:58] right or water shares pending on [2:11:01] reasonable, imminent litigation, and [2:11:05] collective bargaining issues pursuant to [2:11:07] Utah code uh 52-4-204 [2:11:11] through 205. [2:11:13] >> I'll second that. [2:11:14] >> Motion second. All in favor? [2:11:15] >> I [2:11:17] >> There's 12 in. [2:11:20] >> Does anybody want We need a motion to [2:11:22] someone to motion to close the close and [2:11:24] open the open. [2:11:26] >> I'll make a motion to close the close [2:11:28] and reopen the public board meeting. It [2:11:31] is 11:15. [2:11:33] >> I'll second that. [2:11:34] >> Motion second. All in favor? [2:11:36] >> I [2:11:37] >> I'd like to make a motion to immediately [2:11:39] meet [2:11:40] >> Oh, what's that? [2:11:41] >> We don't We were going to have a closing [2:11:42] personnel, but we don't need to. Okay, [2:11:44] we're good. [2:11:46] >> So, do you any do we have any other [2:11:48] business that needs to come before this [2:11:49] body or are we all good? [2:11:52] >> Think we're good. [2:11:53] >> Okay. Someone want to make a motion? [2:11:57] >> I'd like to make a motion to adjurnn. [2:11:59] >> Thank you. [2:12:00] >> You need a second, Danny? I'll [2:12:02] >> second it. [2:12:02] >> Motion second. All in favor? I