[0:00] Okay, good morning everybody. I want to [0:02] welcome you to May 14th, 2026, our [0:04] regular board meeting held. I'd like to [0:07] call this meeting to order. Um, we do [0:11] have a quorum on our board today. [0:14] And here with us today is Trevor Andre, [0:18] our district engineer. Um, Dallas [0:21] Henline is our collections [0:25] uh [0:27] sewer manager. I don't want to say [0:29] sewer, but I did. Sorry. Um, Steve [0:32] Clark, our water manager. Uh, Andrew [0:34] Sumption, our HR. Jeff White, trustee. [0:38] Mick Sudbury, trustee. Danny Stewart, [0:40] trustee. Le Fitzgerald is um our [0:44] controller. And our legal counsel is [0:46] Nathan Bracken, and Clint Dilly is [0:49] excused. Uh, will you guys all please [0:52] stand and with me at the pledge of [0:54] allegiance? [0:57] I aliance to the flag of the United [1:01] States of America and to the republic [1:03] for which it stands. One nation under [1:06] God, indivisible, with liberty and [1:09] justice for all. [1:11] >> Thank you. [1:15] And also I'd like to welcome public and [1:18] guest. Um does anybody here have a [1:22] conflict what's on our agenda today? [1:25] Seeing none. Anybody would like to [1:27] address the board today, [1:30] Dan? [1:32] >> I think we're doing great. [1:33] >> Okay, Doyle. [1:37] >> Everything's good. [1:39] >> Water. [1:40] >> Yeah, we apprec we appreciate taking [1:42] your time out and coming. And uh so [1:46] we're going to move on to item F. [1:49] Let me make sure I'm not screwing up [1:51] because yesterday I was in a meeting and [1:52] I bypassed stuff. So, um, [1:57] do you want to you want to take this? [1:58] >> Yeah. We're going to skip to the bottom [2:00] and go with Kim first so that she can go [2:03] back out to her customers. You want to [2:05] stand, Kim? Uh, we're excited to have [2:08] Kim in here. So about a month and a half [2:11] ago, they decided that they wanted to [2:14] really make a push on getting autopay [2:16] set up for as many customers as possible [2:19] to try and cut down on the amount of [2:22] phone calls that were coming in. And so [2:25] they challenged themselves that whoever [2:27] could get the most uh people signed up [2:30] on autopays. They between Kim, Mandy, [2:35] and Katie, they signed up over 50 new [2:38] customers on autopay, which really cuts [2:41] down on a lot of [2:43] >> delinquencies, [2:46] uh, notices, and things like that. Um, [2:48] so maybe Le could talk a little bit [2:50] about how it helps. you you said [2:53] probably everything we need to say, but [2:54] yeah, obviously when people sign up for [2:56] autopay and have money in their bank. [3:00] It does it cuts down on delinquencies [3:02] and phone calls and just more work for [3:05] us. So [3:06] >> So Kim was the one that did the most. [3:09] She had 22 of the 51. Wow. [3:13] >> And so we just wanted to recognize her [3:14] for her efforts with all of our [3:16] customers with a gift card. [3:17] >> Y Thank you. [3:24] little competition. [3:25] >> Thank you. [3:26] >> Appreciate you. [3:28] >> Look at Manny. [3:30] >> What are you doing? [3:33] >> Thanks, Kim. [3:36] >> Okay, up next we have we have Dawson. [3:39] Uh Dawson's on our uh water construction [3:42] crew. He just completed his collections [3:45] two cert certification. Um Dawson's been [3:48] making a push lately to learn as much [3:51] about this the collection side of things [3:53] as possible. He spent a couple weeks [3:55] with their crew and is preparing himself [3:57] to be able to be an on call operator. [3:59] Thanks to [4:01] >> Thanks to [4:05] Mark Manzanerys, he was unable to make [4:07] it today. Um he's out [4:09] on the camera van was couldn't pull [4:11] away. Uh he completed his water [4:14] distribution one. He's on our [4:16] collections crew. Uh it's always good to [4:18] see those operators going outside of the [4:20] uh area that they specialize in and [4:24] learn more about the district. So that's [4:27] Mark Manzanerys. Um Jean Stock, he [4:31] wasn't able to make it. He's out getting [4:33] all of our fire extinguishers reertified [4:35] for the year. And so he's got a [4:38] >> and he could take 10 minutes to come in [4:39] here. [4:40] >> He's got a guy coming out that he [4:41] couldn't leave alone. Um he just [4:44] finished up his qualified water [4:45] efficient landscaper certification. Um [4:48] that's a big deal. We're excited about [4:51] that. He's learned how to handle our [4:54] garden area so that we can keep it as [4:57] efficient as possible as well as be a [4:59] good steward and an example to the [5:02] public on how to do these things. Um and [5:05] then Ed Tucker, he just finished up his [5:09] traffic control technician. Ed's kind of [5:10] our go-to flagger. Um, when we get the a [5:16] job out there where we need all hands on [5:18] deck, we kind of lean on Ed. And so him [5:20] getting that is a is a big deal. He [5:22] couldn't come in. He's doing CIP. Um, [5:25] but nobody wants to come see the board. [5:28] I think that one was a Steve that was a [5:30] Steve decision on the CIP. [5:33] >> That one's kind of a plant decision. [5:35] When it has to be done, it has to be [5:37] done. [5:37] >> Trevor, what's going on? [5:40] So, those are our employee recognitions [5:42] for today. We're excited about all of [5:44] them, though. [5:45] >> Awesome. [5:45] >> That's awesome. [5:47] >> Congratulations. [5:50] >> Okay, let's move on to item G. Who's [5:52] going to do this one? You, too. [5:53] >> I'll take part of it and we'll lean a [5:55] little bit on the employees as well as [5:58] their managers. Um, first we have [6:00] Melinda Campbell. Um, she's our newest [6:03] office staff. You want to stand, [6:04] Melinda? [6:05] >> There's a microphone right there. [6:07] >> Do I need the microphone? Yes, you. Yes, [6:09] you do. So, I can hear what you're [6:10] saying. [6:11] >> So, so the so the microphone can pick [6:13] you up here. So, we're excited about [6:16] Melinda. She comes with a lot of [6:17] customer service experience as well as [6:19] some leadershipship experience. She's uh [6:23] been a great fit in the office. She's [6:26] really dug in and learned a lot and [6:30] she's expanding that role every day. Uh [6:32] do you want to take a minute just tell [6:33] us a little bit about yourself? [6:35] >> Um like you said, my name is Melinda [6:37] Campbell. I used to be the cheer coach [6:40] at Cypress for many years and I retired [6:44] from that and looked for a big girl job. [6:47] So, I got my big girl job now. So, um [6:51] I'm excited to be here. Uh my son is [6:54] graduating from the fire academy today, [6:55] so I'm really excited about that. [6:57] >> Yeah. Nice. [6:58] >> Thanks, Melinda. [7:03] » Up next, what time is that today? [7:08] out to. [7:10] >> Thanks, Linda. Up next, we have Cameron [7:14] Peterson. Uh Cameron [7:18] comes from us from the country. Uh he [7:20] grew up in a small town, which is kind [7:23] of exciting for me to have another hick [7:27] here. Um, but what really excites us [7:31] about Cameron is his willingness to [7:33] learn, his work ethic, and the fact that [7:36] he came in with already having a CDL, [7:38] which means he can jump into a lot of [7:41] the things that some newer employees [7:43] can't when he first got here. Why don't [7:45] you introduce yourself a little bit? [7:48] >> Yeah, thanks, Andrew. And yeah, I'm [7:50] Cameron. I'm really excited to be here. [7:53] I appreciate being here. [7:55] There's not a whole lot the city just [7:59] getting used to it and [8:01] yeah, I appreciate the opportunity and [8:03] I'll give it my best. [8:05] >> Thanks. Got anything to add, Dallas? [8:07] >> I would just say Cam's finishing up his [8:08] second week. Um he's been thrown into a [8:11] pretty labor intensive job that we're on [8:13] right now and um he's sticking right [8:15] with the guys and they've reported back [8:17] that he's fitting in good which is [8:18] important and we're real excited about [8:20] it. [8:21] >> Thank you. [8:21] >> Thanks. [8:22] >> What What made you earn a CDL? What were [8:24] you doing before that? [8:27] >> Um, [8:29] really just the opportunities and [8:32] getting something under my belt that I [8:35] can have to [8:37] >> So, you weren't doing over the road or [8:39] anything like that? [8:39] >> No, he jumped into Slick, the community [8:42] college, and paid for it and got it all [8:44] on his own. [8:44] >> Yep. I actually graduated the day of my [8:48] interview, so yeah, I'm pretty new to [8:50] it, but [8:51] >> that's good to have. [8:52] >> Thanks, Cam. Well, welcome. Glad to have [8:54] you. [8:55] >> Thank you. [8:59] » And up next, our newest employee, Trevor [9:01] Ratcliffe. He just joined the water [9:02] construction crew. Um Trevor came uh [9:06] with strong reference from Gavin [9:10] Henshaw, one of our uh employees. It's [9:14] always good to have employees that are [9:16] referencing somebody to give us a idea [9:18] of who that person might be. Um, why [9:21] don't you tell us a little bit about [9:22] yourself, Trevor? [9:24] >> My name is Trevor Ratcliffe. Grew up [9:26] here in Magnum my whole life. I like [9:28] going hunting and I'm excited to be [9:30] here. [9:32] >> You got anything to add, Steve? [9:34] >> Oh, like I say, he's only been here a [9:36] week, but we're excited to have him. I [9:39] mean, he's already fitting in great with [9:41] the guys, so I think [9:42] >> we got Magna. Yeah, another Magna guy. [9:45] Thanks, Trevor. [9:50] That's it for our new employee [9:51] introductions. We're excited to have [9:53] them all though. [9:54] >> See you guys. [10:02] » Oh. Oh, sorry. Okay. Moving on. Approval [10:06] of common consent items. [10:09] >> This is the regular board meeting held [10:11] April 9th, 2026. Expenses from April 1st [10:15] to May 6th, 20 [10:17] 26. [10:19] General expenses 2,26,4483 [10:25] science bank bond payment 1,336,99729. [10:32] » I'll second it. [10:33] >> It's been motion second. All in favor? [10:35] >> I. [10:36] >> Thank you. Let's move on to our uh [10:38] department report. Let's move on to [10:41] general manner manager report. Trevor [10:43] Andrews filling in. [10:44] >> Yep. I'll cover that. So, just a few [10:48] things on here. Andrew is going to go [10:50] over staffing. So, I'm going to jump [10:52] from there into operations. [10:56] Um, as you know, we've been using reuse. [10:59] That's been going well. Um, [11:03] the parts for the copper club secondary [11:06] extension, those are been ordered and [11:09] just waiting on those before the [11:11] construction crew will start [11:14] uh building that. [11:16] And then want to jump over to the office [11:21] portion. [11:23] Um, we worked with Yappify [11:27] to put in an application for a grant. [11:30] It's the transparent water billing grant [11:33] and that will help pay for the AMI uh [11:37] kind of customer portal that we have [11:39] with Yapplify. So, if we get that grant, [11:41] it'll cover 50% of the cost for 3 years, [11:44] which is pretty significant. [11:47] Um, and they just look for wanting [11:51] information at the end of the year, you [11:53] know, looking at did it change the water [11:55] use, you know, things like that. So, um, [11:59] we'll let you know if that comes [12:00] through. [12:01] >> Hey, Trevor, I got to ask you a [12:02] question. [12:02] >> Yeah. [12:03] >> I had a resident from Murray called me [12:05] yesterday for the Jordan Valley. So the [12:08] question I have, do we have a deal [12:10] that's on our computers that let's just [12:13] say if somebody's really using a lots to [12:16] lots of water, does do we have something [12:18] that actually bings our computers out [12:20] here letting them know that that people [12:22] because this this deal that happened [12:24] over in in Murray through Jordan Valley, [12:27] it went for 6 months before [12:32] they caught it. [12:33] >> Yeah. So this once we have that AMI [12:36] customer portal, we can set those [12:38] notifications and the customer will be [12:41] able to set their own as well. [12:42] >> And I think that would be really good [12:44] because there was, [12:46] >> you know, six months. [12:47] >> So So I'll add I don't think it would [12:49] ever go 6 months because of the way [12:51] Leo's uh office runs it. Maybe she can [12:54] talk about what they do. [12:55] >> We just get all the usages once a month, [12:58] right? So if it's over a 100,000 gallons [13:01] of usage, then we notify the customer to [13:04] set up a leak check. [13:06] >> Okay. [13:06] >> Um so but if they don't respond to our [13:09] notices or anything, then there's no way [13:12] we can check for a leak. [13:13] >> Right. Right. [13:14] >> But if they do, then we'll set up an [13:16] appointment with our guys and they'll go [13:17] out and do a leak check. I [13:18] >> I'm wondering if we need to send out a [13:20] reminder. I had three people this last [13:22] month [13:23] >> had overflows going over because the [13:25] float changed. [13:26] >> Yeah. One of them had to replace the [13:28] whole float. The other ones were just [13:30] adjustment. People don't even realize [13:32] that water is just going over the whole [13:34] float. [13:34] >> The toilet. [13:35] >> Yeah. Yeah. [13:36] >> Maybe we need to send out a reminder. [13:38] Can we do that with the building? [13:40] >> Yeah. Yeah. Yeah. [13:42] >> If was she'd remind them, [13:44] >> huh? [13:45] >> If Vie was here, she would. Virginia. [13:49] Well, I'm just saying that we ought to [13:50] maybe put something in our billing and [13:53] just remind people to check the floats [13:55] because that's so silent they don't even [13:57] know it. [13:58] >> And I had that happened to my brother, [13:59] too. His house, he had like three of his [14:01] toilets out of four were like going over [14:03] and he couldn't understand. And Raymond [14:05] went up there and looked at all the [14:06] income to find out why they went inside [14:08] and the toilets the overflow. [14:10] >> I was just saying if you get 3,000 [14:12] gallons, that's a little too late, isn't [14:14] it? [14:15] >> Yeah. 100,000 gallons is a lot. [14:18] >> I thought it was 3,000. [14:19] >> No, no, no. We do over a 100,000 in one [14:22] month. I mean, that's a lot. [14:25] >> But with this new system, it'll ping [14:27] them. [14:28] >> Yeah. [14:28] >> Continuous use or [14:30] >> This is us manually doing it. But with [14:32] the new system, it'll be automatic and [14:34] they could set their own. Like I [14:36] average$7,000 [14:38] a month. So, if it goes over that, let [14:40] me know. Yeah. You know, something like [14:42] that. [14:43] >> So, they'll have a lot more control. And [14:45] we'll also be able to set our own, you [14:48] know, more [14:49] >> custom [14:51] >> alerts. [14:52] >> Right now, it's all manually. [14:54] >> I think it's really important because [14:55] it's going to save a lot of headache, [14:57] especially on sprinkler systems where [14:58] they've got sticking valves and things [15:00] like that [15:01] >> because it goes in the ground and they [15:02] don't ever see it. [15:03] >> That's going to be great. [15:05] >> Yeah. [15:07] Um, next we'll jump down to [15:10] communication and morale. Um, [15:14] I'll just mention these and then Andrew [15:16] and Steve can talk a little more about [15:18] it, but they've done a couple of uh [15:21] visits to schools. They did a elementary [15:24] school assembly and then they had um a [15:29] career day at Lacidge Elementary. So, [15:31] I'm going to pull up some pictures of [15:33] that and they can discuss kind of what [15:35] was going on there. [15:38] I think we need to I think we need to [15:41] start visiting the schools a little more [15:43] often to give some prospective [15:47] employees. [15:47] >> Yeah. I think I think the presentations [15:50] that we prepared for this one partic [15:53] this one that we did last Friday in [15:55] particular we could start to reuse and [15:59] start going to these schools more [16:00] frequently. [16:01] >> Well, I think it's important to do that. [16:02] In fact, I'm with the city. We're we [16:05] want to engage in the schools, you know. [16:07] So, I think this would be important that [16:09] we could engage in with all the schools [16:12] if we can, especially at the younger [16:14] level. I don't know how much the high [16:16] school people, but I think from the [16:19] junior highs down [16:20] >> would be a big plus. [16:23] >> They seem to be more receptive in the [16:24] elementary, I think. [16:26] >> Yeah. [16:26] >> Especially like the third to sixth grade [16:29] age range. They were [16:30] >> right. [16:31] >> They really enjoyed it. [16:33] >> So, these pictures You flip through [16:34] first. These are at Lakeridge Elementary [16:38] career day that we did on Tuesday. Uh [16:41] Steve's crew and uh [16:43] >> Ty went and set up a booth as well as [16:46] some people outside showing equipment [16:48] and they had a chance to talk to all the [16:49] employee all the kids came through each [16:52] class one by one and they were able to [16:54] explain a little bit about what we do [16:57] here at Magna Water and how the water [17:00] gets to them. It was a pretty positive [17:02] experience. They spent from 1:00 till [17:05] 3:15 that day [17:07] >> meeting with children and it was pretty [17:09] exciting. Um then on Friday last week uh [17:14] we teamed up with Jordan Valley and me [17:17] and Steve went and spoke to an assembly [17:20] of kids. They had two assemblies. Um we [17:23] spoke at both of them and we talked [17:26] about water conservation. Steve taught [17:28] them how water gets to their houses and [17:31] what we do here. And I was able to talk [17:34] to them a little bit about the different [17:36] jobs here at Magna Water and [17:41] what the possibilities are for them if [17:43] they decided that this was the route [17:44] that they'd like to go. They liked it so [17:47] much that they're already trying to [17:50] invite us back out. So, [17:52] >> it's pretty exciting. [17:54] >> Yeah. Last month, Adobe Rock had a [17:57] >> open open house. And all I heard the [18:01] kids say, I got to go crawl up on the [18:03] loader and honk the horn. [18:07] >> Talk about stimulating cells. [18:10] >> That's good. That's good. [18:11] >> I think that's really good. [18:13] >> Yeah, I think it went well. [18:14] >> Yeah. Do we take any like any little [18:18] gadgets to give? [18:19] >> So, we're going to order some next week [18:21] to start handing out. We handed out some [18:24] candy at the Lacage event. Um, at this [18:28] event, it was such short notice that we [18:30] didn't have time to get anything ordered [18:32] that we went and spoke to the assembly. [18:33] But, uh, we're we're planning on getting [18:36] some stickers and some pencils and stuff [18:38] to hand out of these and we look forward [18:41] to doing some more in the future. [18:43] >> Mhm. [18:44] >> That's really nice. [18:46] >> Okay, that's all I had with the managers [18:49] report. [18:50] >> Thank you, Trevor. Now, it's your turn [18:52] again. Yep. Okay, we'll go into the [18:55] engineering report. So, just some [18:58] progress updates. Influent pump station. [19:01] Um, moving along. Well, I wanted to just [19:03] bring up a few pictures here because [19:05] there's some pretty significant [19:08] uh you know, [19:11] progress there. This is the grit [19:13] building with those classifiers. There's [19:16] the two of them. A lot of intricate [19:17] piping that's in there. There'll be a [19:19] platform here in the center. [19:22] Do they run simultaneously or do they [19:24] alternate? [19:25] >> It's one in one. So redundancy and we [19:28] usually go six months between [19:32] » and then another significant well we'll [19:35] just go into this is also part of the [19:37] grit. This is the grit separator. They [19:41] did some work down below that grading [19:43] and then um up here on top with the pump [19:46] and motor that takes the grit to that [19:50] grit classifier that we just looked at. [19:52] Um some other things that have been [19:54] happening is uh the screw pumps. They [19:56] grouted those. So they've got them [19:58] formed up here. Just a few pictures of [20:01] that. And then we'll watch a a short [20:03] little video of that process [20:08] trying to find which one is the best. [20:11] might be this one. Uh pretty pretty time [20:14] consuming. They they mix up grout, they [20:17] put it in this little hopper, and then [20:18] drop it basically right down onto the [20:22] um [20:24] right down onto the screw [20:26] >> on the augur. [20:27] >> And the screw [20:28] >> that close up the gap, Trevor. [20:30] >> Yeah. What that does is it fills the [20:33] space in between, you know, what they've [20:35] already poured and the screw. And the [20:38] screws just run and pull that up, you [20:42] know, and they just kind of move this up the screw as they go. [20:48] >> Imagine that uh wears out the concrete. [20:53] >> Well, once it once it's complete, [20:56] um I think this one's actually moving. [20:59] Yeah. So, once it's complete, what they [21:01] did was weld a a small little quarter [21:03] inch bead around that entire screw [21:05] >> on the auger. [21:06] >> Yep. And once this grouts in and dries, [21:09] then they remove that so there's that [21:12] small gap there so it's not rubbing [21:14] >> on it. [21:16] >> Yep. Yep. So [21:19] >> So I I've got some stuff I picked up. [21:21] >> Like here's a pretty good picture of [21:23] that. [21:24] >> Oh yeah. [21:26] >> So [21:27] >> have you ever heard of sewer coat? [21:30] I picked up a couple pallets of that and [21:32] they use it to repair manholes and stuff [21:35] and it is some tough grout. I'm called [21:38] sewer coat. [21:39] >> Okay. [21:40] >> Yeah. So, they got all three of those [21:42] done last week. Um, successful, [21:46] worked really well, and so that's just [21:49] getting much much closer to being a [21:51] fully functional pump station. So, it's [21:54] pretty exciting. [21:56] um Hannes well number eight. We've got a [21:58] pre-construction meeting um next week. [22:02] So that will get going here and we'll [22:06] probably be, you know, breaking ground [22:08] with that drill in the well this month. [22:11] Um working on the grant application [22:14] right now. We've got that about 90% [22:17] complete, which basically we'll just [22:19] turn everything in, make sure the EPA is [22:21] okay with everything we've turned in, [22:23] and then that grant will be awarded. Um, [22:26] so that's that's exciting. That's [22:28] moving. [22:30] Um, some other things, the change house [22:33] or operations building at the WRF is [22:37] it's out to bid right now. It closes on [22:39] May 21st next week. We had quite a few [22:42] contractors that were uh they came to [22:46] our mandatory pre-bid, which means [22:48] they're the only contractors then that [22:50] can bid on that. Um [22:52] >> we had quite a few. [22:54] >> Yeah, I want to say there was six, seven [22:56] of them. [22:57] >> Wow. [22:57] >> Pretty good interest. Um some questions [23:01] so far, but I think that's going well. [23:04] So, we'll see how that shakes out next [23:07] week and we'll bring that to the board [23:08] in June. [23:11] um secondary reservoir in zone three [23:14] that has been cruising the last month. [23:17] Got a few pictures here of that. This [23:21] don't have a lot of in between pictures, [23:23] but I can show you kind of the beginning [23:25] and the end. Um so this was pretty close [23:28] to right at the beginning. Um you can [23:32] see they're just barely starting to [23:34] scrape that down. Um, and then as we [23:39] move, this is about a month later. [23:41] They've moved quite a bit, but you can [23:42] see there's lots of water, which they [23:45] dealt with a lot of water down in the [23:47] hole throughout. [23:49] >> That's crazy. All them springs. [23:51] >> But now we're moving into this was a few [23:53] weeks ago. Um, they've got it fully dug. [23:57] They've got liner in. That's what this [24:00] is going in there. [24:01] >> What's the white? That looks like a [24:03] bunch of seagulls there. Uh they've just [24:05] got bags [24:06] >> pulling it blowing. [24:07] >> Yeah. [24:08] >> So Trevor, I got a question. You know [24:09] how they have all that problems up there [24:11] and I actually I went Don took me up [24:13] there last week and we tooured it and [24:15] everything. Pretty impressive. But the [24:17] question where you have all that ground, [24:19] you know, all them springs. Can that [24:21] water be some way used to go into this pond or [24:27] >> So we have a it's complicated. It would [24:30] be um we have a change application with [24:32] Kennott to bring spring water to our [24:34] zone two. [24:35] >> Okay. [24:36] >> Um but we don't really know where the [24:38] origin of these ones is. You know, where [24:40] this spring is coming from. So it would [24:43] probably take investigating where that [24:44] is, finding out whose water, [24:47] possibly water right issues, things of [24:50] that nature. So [24:51] >> it just comes [24:53] in a trench and put a perforated pipe in [24:55] like we do in a drain field. Right now [24:57] we have that around the reservoir. Um [25:00] and it takes it out and it just [25:02] discharges it in our basically where we [25:04] would overflow by that holly drilled [25:07] that spring used to be right up there by [25:09] them trees. [25:10] >> Okay. [25:10] >> And there was some troughs there and it [25:12] there was quite a bit of water coming [25:13] out of it. [25:13] >> I remember we went up there that time. [25:15] >> Well, that's one below there and there [25:17] right by that holly road and them trees [25:19] are there. That's where they watered the [25:20] cows. [25:21] >> Okay. [25:22] >> There is a big spring right there. [25:24] >> This is coming through the ground. So, [25:26] we don't know if it originates from that [25:28] or somewhere completely, [25:30] >> but yeah, we're capturing and you know, [25:32] so it doesn't affect our reservoir. [25:35] >> And I know that spring is up at the top [25:37] of there. [25:38] >> So, [25:39] >> do they just overlap, Trevor, or do they [25:41] fuse it on? [25:43] >> They they overlap them and they put a [25:45] little vent [25:47] uh between the two layers and then that [25:49] when that gets wet. [25:50] >> That's pretty neat. I was watching them [25:51] do that and they were pretty close to [25:52] being done. Um, so there's kind of the [25:54] two sides of the reservoir. This is [25:57] continuing that progress as they buried [25:59] some of that liner [26:02] and then they're here. They are putting [26:05] some rock around the edges [26:08] and Dallas was able to get out there and [26:10] drone. So, we got a a couple, you know, [26:13] aerial views here. You know what I'd [26:16] really like you guys to do is get these [26:17] pictures and I'd like to I would like to [26:20] have them, you know, made up into [26:23] frames. And I think some of these [26:25] projects we're doing, I think we need to [26:26] put them on our walls just, you know, [26:30] >> or have it or have it have a screen and [26:33] have it run through it. [26:34] >> Right. Right. Right. [26:35] >> Stand there. And it'd be it'd be [26:37] important to see some of this stuff on [26:39] our walls like down that hallway cuz [26:41] when I go over to other districts, they [26:43] have all that stuff and I'd like to see [26:45] that happen. [26:48] » We'll do that. So, speaking of this [26:51] project and site visit, I know Mick was [26:53] out there. He looked at it. We were [26:55] wanting to see if the board would would [26:57] like to visit it possibly before the [27:00] June meeting next next month [27:05] if there's interest in that. [27:08] >> I don't know. [27:09] >> Should we plan? [27:10] >> I haven't even been down ser [27:12] >> plan for that. I mean, I think we could [27:14] do it just before the meeting, you know, [27:16] maybe it's around 9 or so or 9:30 or [27:19] >> Everybody says, "When are they going to [27:20] put the fish in here?" And I said, [27:21] "There's no fish. This ain't a fishing [27:24] pond [27:24] >> and hopefully they don't grow in there. [27:26] You know, [27:28] >> should be getting some pretty clean [27:29] water. So, just a little update on that. [27:32] Uh [27:33] >> morning before the uh [27:35] >> June meeting, [27:36] >> second Thursday. [27:37] >> Yeah, if we could plan for that and [27:39] >> a little bit of coffee and donuts. [27:41] >> Sure. [27:42] >> Don't need no donuts. [27:44] >> Um other things, lead and copper, [27:46] >> dilbert, [27:48] >> lead copper service replacements been [27:50] going well. They've just been moving [27:52] around the city. Um they've completed [27:55] 9100 including pavement. Um moving on to [27:59] other areas. 8950 is one of those. But [28:02] that's been overall a really good [28:04] process. The homeowners have been, you [28:08] know, really receptive [28:10] um helping us get through that. So that [28:14] is the end of the engineering report. [28:16] >> Thank you, Trevor. [28:17] >> Yep. [28:19] >> Okay, moving on. Let's move over to [28:23] We're going to move over to you, Steve. [28:25] >> All right. Thank you, board chair. Um, [28:28] so the water production summary for the [28:30] month of April, as far as culinary goes, [28:33] we've produced 113.06 [28:37] million gallons or 347 acre feet. That's [28:41] a 2.82% [28:43] decrease from 2025. [28:46] Year to date, we've produced 418.7 [28:50] million gallons for 1,285.03 [28:54] acre feet. That's a 1.2 29% increase [28:59] from 2025 year to date. So far, year to [29:03] date, we purchased 263.66 [29:07] acre feet of water from Jordan Valley. [29:10] And the secondary water production um [29:13] for April was 16.22. 22 million gallons [29:17] or 49.8 acre feet. That's a 29.14% [29:22] decrease from 2025. [29:26] Year to date, we've done 20.84 million [29:29] gallons or 63.96 [29:32] acre feet. [29:34] That's a 0.55% decrease from 2025. [29:39] As far as call outs go, we had a total [29:43] of 13. 10 of those were water. Three of [29:46] them were wastewater for a total of 39 [29:48] hours. 30 that were water and nine were [29:52] wastewater. [29:53] We had three service line leaks and then [29:56] 10 miscellaneous call outs. [30:00] Um, that's all I have unless you have [30:02] questions on any of it. [30:05] >> You have any questions, Jeff? [30:07] >> Thanks, Steve. [30:09] K Dallas, [30:10] >> Mr. Chairman, thank you. Just go over [30:12] quickly the water reclamation facility [30:15] operational support for April. The [30:17] plants running really well. The reuse [30:19] system is fully operational. We pumped [30:22] just about 13 1.5 million gallons up to [30:25] the reservoirs during the month of [30:27] April. Um BOD and TSS removals still [30:31] really high at 98%. [30:33] Um wasting rate is maintained. Daily [30:36] average plant flow is about the same. [30:38] We're running about 2.8 million gallons [30:40] per day right now. And then u the [30:42] treatment crew completed a scheduled [30:45] service interview or interval on our [30:47] Hubra fine screens. There were some [30:48] wearable rollers that needed to be [30:50] replaced. And then while we had the [30:52] system down, we replaced some of the [30:54] worn fittings from steel to stainless [30:57] steel just to improve durability and [31:00] long-term reliability. And then right [31:03] now we're averaging an annual average of [31:05] 1.03 [31:07] on the total phosphorus. So we're still [31:10] looking really good towards our annual [31:11] average that we need to be under 1.0. Um [31:15] on the collection system side, we're [31:17] starting the acoustic inspection with [31:19] SLR wrap the last week of May. That'll [31:22] probably take two to three weeks of [31:24] work. Um, and then right now as far as [31:27] the Vector location through the town, [31:29] we're below Magnum Main Street and [31:32] working our way from 9200 to 8,400. And [31:35] then with the camera van, we're just up [31:38] above 35th Souththeast of 8000 up near [31:42] Belfast and working our way back down to [31:44] 35th. [31:45] >> Great. [31:45] >> So, any questions? [31:47] >> Nope. I seen him out there um [31:48] jackhammering around all the [31:51] >> So [31:51] >> yeah, we got to get some of those [31:52] manholes that get paved over up before [31:54] we do the inspection. So that's right. [31:56] >> Which numbers on our phosphates on the [31:58] chart? [31:59] >> Total phosphorus um it'll be [32:03] >> just in the bottom on the monthly [32:04] highlights [32:06] >> on the [32:07] >> effluent total FOS currently trending at [32:10] 1.03. [32:12] >> And what's our [32:14] >> 1.0 zero is the annual average. Now that [32:16] we're into the reuse season, every [32:19] gallon of water that we send up is we [32:21] get an equivalent pounds of phosphorus [32:23] credit back. [32:24] >> Okay. [32:25] >> So, [32:25] >> uh do we have a guideline or do you have [32:28] a limit on that? [32:29] >> Uh [32:30] >> state established a limit on phosphorus. [32:32] >> Yeah, the state the permit requirement [32:34] is 1.0 as an annual average. Um, so for [32:38] example, last year we ended at about [32:41] 1.3, but with our total FOS credit, we [32:44] ended up at like 0.85. [32:46] >> How do you get a FOS credit? [32:47] >> Because the reuse water that goes up to [32:50] the town isn't discharged to our regular [32:52] discharge waters. [32:53] >> That's good. [32:54] >> That's why reuse is so important. [32:55] >> A lot of credits. [32:57] >> How many credits do you usually get? [32:59] >> Last year we it was almost point4. [33:02] >> Oh my in credit. [33:03] >> That's good. That's why we try to [33:05] prioritize the reuse water so heavily. [33:08] >> Everybody I know that's on it loves it. [33:10] >> We love it. It's really good. [33:12] >> No fish, no scales, [33:14] >> no plugs. [33:15] >> Yeah. Less filter cleaning. [33:17] >> Yeah. [33:17] >> And that's all I have, Mr. Chairman. [33:19] Thank you. [33:19] >> Okay. Thanks, Dallas. [33:21] >> Okay, moving on. Let's go over to uh Le, [33:25] our controller. [33:26] >> Thank you, Mr. Chair and board. Um, so [33:29] the first item on my agenda is the legal [33:32] requirements. um report. I wanted to let [33:36] you know that I've changed the form a [33:37] little bit. It used to have another [33:39] column on the end that was next due [33:42] date. So, if we completed something in [33:45] 26, that date would show in 27. But I [33:48] thought this might be a little bit [33:50] easier to read. It has date completed [33:53] and the due date. So, it shows if it's [33:56] blank, that doesn't mean it's it means [33:58] it's not done. And then it then with the [34:01] due date you can see, oh, were we late [34:02] or were we early? Were we on time? So [34:06] anyway, [34:06] >> I like that. [34:07] >> Yeah, I I thought it was easier to read. [34:09] But what's coming up is uh our annual [34:13] filing requirement to the state [34:14] auditors, our 2025 financial statements. [34:19] The auditors came out the first of this [34:21] month and got all their field work in [34:23] one day. And so [34:26] we're anticipating having the report [34:28] presented to the board next month. So [34:30] that'll be able to be reported to the [34:32] state by June 30th. And then the blues [34:35] are the items that were finished by the [34:38] end of April. Um we got reported [34:40] everything we needed to to the [34:42] transparency website. The WWTP [34:46] annual bioolids report to the state [34:49] Dallas got that completed. [34:51] um [34:53] our registry that we have to file every [34:55] year to and pay $25 to just update our [34:58] registry with the lieutenant governor's [35:00] office. That's done. [35:02] Um we got our first quarter payroll or [35:05] yeah payroll reports completed. [35:08] The municipal wastewater planning [35:10] program report that is another agenda [35:12] item later today. Uh the publishment of [35:17] the CCR report, everyone knows it's got [35:19] to be out by July 1st to our cons, our [35:21] customers. So that's another later [35:24] agenda item to go through. And then the [35:28] ethical behavior written pledge to the [35:30] trustees and employees. Um we're [35:33] anticipating having that all signed by [35:34] the end of this month. [35:36] >> Yes, we presented we presented it to [35:38] them at the last safety meeting. They'll [35:40] sign it at this coming safety meeting. [35:41] >> Great. And then the last one on the [35:44] second page is the grandma training the [35:46] requirement annual that I completed uh [35:50] for 2026. [35:54] And let's see, oh we're working on a [35:58] freight study with um bone columns, but [36:02] nothing's come up of that yet. [36:05] That's the compliance report. If you'd [36:07] like, I can go on to the financial [36:09] report unless you have any questions on [36:11] the I thought it looked really good. [36:13] >> Okay, we do show a loss right now, but [36:16] almost every year at this time, we do [36:18] show a loss. [36:18] >> That's what I was just going to say. [36:20] >> At this time of year, we always show [36:21] that loss. [36:22] >> And we do and honestly, our budget shows [36:26] a loss pretty much through the whole [36:29] entire year until tax money comes in, [36:31] >> right? [36:32] >> So, it just that's shows just what [36:35] happens is if we didn't collect taxes, [36:38] we would be at a in a deficit, [36:41] >> right? So it helps support our on&m m [36:43] and pays our bond payments. So [36:45] >> well you know what like I said I like [36:47] this layout because you could understand [36:49] it and you know and read it a lot better [36:52] easier. Yeah. [36:54] >> Shows you where we're under budget or [36:56] over budget. [36:57] >> Right now the revenues are under budget [37:00] and the expenses are under budget too. [37:03] So that's good. If you'd like, I can go [37:06] through some more. But um [37:07] >> Jeff, you have anything you're concerned [37:10] best I've seen. [37:11] >> That's what I said. I like this layout. [37:13] I'm trying to get the city to kind of [37:15] >> do this kind of stuff. [37:17] >> Yeah. Great. Good. Um there are [37:19] restricted funds [37:21] as we all know, we've spent we're [37:23] spending them on some projects. So the [37:25] total of uh funds have gone down. And [37:30] then in the later page, [37:31] >> tell me that because I that's where I [37:33] get really nervous. [37:34] >> You and I both. But we're okay. [37:37] >> We're okay. [37:38] >> We don't have to sell that land yet, [37:40] right? [37:42] >> Soon as you can. No, Trevor says. [37:46] >> As soon as you can. [37:48] >> So restricted fund balance, we have 12 [37:51] million and unrestricted, we have 12 [37:53] million. [37:55] And then the rest of the pages are line [37:58] by line, detail by detail. But you can [38:00] see on the first page of the detail, our [38:03] water sales are at 104%. So the sales [38:05] really aren't [38:08] low. We're not under budget, just on [38:10] strictly water sales. It's the other [38:12] revenue sections that pulls us down [38:15] under. And [38:16] >> how about our impact fees? I noticed [38:18] because we were talking about that the [38:19] other night with the city, how the [38:21] impact fees have kind of um [38:24] slowed way down. Yeah. [38:27] >> Yeah. We definitely show that same [38:28] thing. Um, [38:30] >> don't we have new impact fees? It'll [38:31] take place on June 1st. [38:33] >> May 19th is when they go into May, [38:36] >> right? [38:37] >> Yeah. 19th. [38:38] >> It was 90 days on the 19th. Yeah. [38:40] >> But that means when we don't have impact [38:42] fees, that means they're not building. [38:44] So, [38:44] >> that's right. Yeah. [38:45] >> It's a plus. [38:46] >> Mahogany should have quite a few coming, [38:48] >> which is a good thing. [38:49] >> Mahogany's paid for phase one and two. [38:52] the other phases haven't. So, [38:54] >> so how many phases over there? Four. [38:56] >> There's four that we've approved so far. [39:00] We're looking at five right now, and [39:02] they'll probably be a six and a seven. [39:06] So, that's that's good for impact fee [39:08] wise. [39:12] » Okay. [39:15] >> So, I mean, overall compared to budget, [39:17] we're in a good position. [39:19] >> That's good. [39:20] >> Great. Thank you. Thanks. [39:22] >> Thank you. [39:23] >> Okay, Andrew, your report. [39:26] >> Thank you, board chair. Uh, [39:28] first thing I want to draw your [39:30] attention to is that we are fully [39:32] staffed. [39:35] Um, as you know, that's [39:38] pretty impressive throughout all of the [39:40] industry right now to be fully staffed. [39:42] We're pretty excited about that. [39:44] um just speaks to how well the managers [39:46] are doing at managing the crew and the [39:49] morale and as well as what we offer [39:52] here. Um then we go into training. We [39:55] talked a little bit about the traffic [39:56] control tech that Ed did and Jean's uh [40:00] qualified water efficient landscaper. We [40:02] did hold a manager league team building. [40:05] uh Trevor and the engineering group uh [40:08] led a training where we're where we're [40:11] all able to participate in uh [40:14] communication [40:16] uh activity. Uh and then we also had an [40:19] on-site fire extinguisher training from [40:21] Unified. I've got a couple pictures down [40:23] below that. [40:24] >> I don't think Le's supposed to be able [40:25] to touch a extinguisher. [40:28] >> I didn't look. See [40:29] >> there? There's Lis. She pulled the pin [40:31] and she let her have it. [40:32] >> Yeah, that's good. Um, everybody was [40:35] able to get their hands on a fire [40:36] extinguisher. [40:38] >> A lot of people [40:39] >> The first one I tried was not It was [40:41] almost gone. So, it's like And then the [40:44] second one, man, [40:47] >> it was full. [40:49] >> It's always one of the the operators [40:51] favorite one to do to be able to go out [40:53] there and get their hands on an [40:55] experience, [40:55] >> take their anger out on it. Right. [40:57] >> So, that was a good training. [40:59] >> Unified did a good job presenting. So, [41:02] we're excited to have them and partner [41:03] with them. [41:04] >> So, did you will you write them a letter [41:05] thanking them? [41:06] >> Yes, [41:06] >> please. [41:07] >> We'll do that. [41:09] Um, the on-site cyber security training [41:14] was scheduled for May 27th. We're having [41:15] to push that. Justin Bagos uh had a [41:20] conflict. So, we'll do that in July. Um, [41:23] we are doing arbinger training with our [41:24] three new employees on June 2nd and 3rd. [41:27] I'll be treating that training. Um, and [41:31] then we're getting a handful of [41:32] employees to uh trench and excavation [41:35] safety training on June 3rd. And then we [41:39] have a company our a company coming in [41:41] doing on-site confined space training [41:43] with our and showing us some tripods and [41:48] uh going through our gas monitor on June [41:50] 24th. Uh this month we're focusing on [41:54] driving safety. Uh we've been covering [41:57] things like uh [42:00] speed and what to watch for in each of [42:03] the morning meetings. Um no conferences [42:06] currently planned. Succession planning [42:08] has been completed. We were able to meet [42:10] with uh people and have 66 discussions [42:13] on uh what the possibilities are for [42:16] people that are wanting to move forward. [42:18] I think the most exciting thing is is to [42:20] see from the last time we did these [42:24] meetings to this time that people are [42:27] grasping hold of, hey, let's plan ahead [42:29] and let's look to our future. Anything [42:31] from you guys on the secession planning [42:34] that we did with you? We had a few come [42:36] in and talk about the inspector position [42:38] and a lot of the younger generation were [42:41] pretty, you know, active in their [42:43] questions and [42:45] >> seemed motivated to kind of take the [42:47] advice that they were given through [42:49] that. So, it was exciting. [42:51] >> That's what I've noticed is um they're [42:55] listening now. [42:57] >> I mean, they're listening to what it [42:58] would take. [42:59] >> Yeah. [43:00] >> They're they're taking that from them. [43:02] >> Yeah. So, we'll be better prepared in [43:04] the future. So, it's exciting. And, uh, [43:08] the last thing that I wanted to bring up [43:10] is that that's not on here is a couple [43:12] things that I've been working on. Uh, [43:15] one is I'm starting to look into the [43:18] vehicle evaluation um to see where we're [43:21] at with with our fleet. And so, I'll [43:24] have a report next month on that. And [43:27] then the other thing is is with the [43:31] union contract expiring next year, um [43:35] we're starting to evaluate what some of [43:37] the questions are that that people have [43:39] come up with so that we're prepared for [43:41] that that discussion when it comes up. [43:43] Some of the things that we're looking [43:45] into currently is where we are with [43:48] maternity leave and things like that if [43:51] we're matching up with the other [43:53] districts and and there's other [43:56] interests that that that employees have [43:58] brought up is the sick leave. And so [44:00] we're we're benchmarking ourselves on [44:03] that as well so that we're ready for [44:04] that discussion if it does come up in [44:06] into the negotiations. [44:08] >> Um that's it for me unless further [44:11] questions. So, um, just a heads up, what [44:13] about the Fourth of July parade? [44:15] >> Um, I'm I'm entering into that. We're [44:18] going to use the, uh, camera van. Dallas [44:21] is going to have it all prepared and [44:23] we'll have a couple employees and a [44:24] manager there for that event. [44:26] >> And then also, just to give the water [44:29] company a heads up, um, I do have, uh, [44:34] traffic control out radar in all around [44:36] the city. So, okay, [44:38] >> just to give you guys a heads up on [44:40] that. [44:41] Um, so [44:44] >> yeah, I've been noticing that quite a [44:46] bit. [44:46] >> Yeah, we've I got them out [44:48] >> trying to reduce the speed. [44:50] >> We reduce we reduce the speed on 8,000 [44:53] from 40 to 35 and [44:55] >> Okay. [44:56] >> people that we wrote quite a few tickets [44:58] over on there and I know that's one of [44:59] our main roads we travel. So [45:01] >> pretty. [45:02] >> Yeah. So they're just [45:04] >> I was wondering if that change was [45:05] recent. [45:06] >> Yeah. [45:07] >> That's cool. I think I think that that's [45:10] uh definitely needed. So, [45:13] >> appreciate the city looking into that. [45:14] >> Yep. I just want to make sure, you know, [45:16] I want to give you guys all a heads up [45:17] and [45:20] >> so you can't say I didn't know that. [45:21] Yes. Do [45:23] >> they make the employees pay if they get [45:25] a speeding ticket? It's it's not [45:27] >> the taxpayers pay it. [45:29] >> Uhuh. [45:30] >> No, I just The employee the employee [45:32] would pay the ticket. [45:33] >> Yeah. It's not the water company. [45:35] >> No employee. No. No. That's on their [45:37] driving record. [45:39] >> Yes. [45:39] >> Hey, give me that look again. [45:43] >> Fortunately, we haven't had any speeding [45:47] tickets [45:48] >> since I've been here. [45:51] >> Okay. Um, again, I want to take a second [45:54] really fast. I want to thank all you [45:56] guys. Like I said, I was laying in bed [45:58] the other night just thinking my career [46:00] here for going on 17 years from where I [46:03] started to where we're at now. It's like [46:05] night and day. And I hear all the time [46:07] how how everybody says Magnum Water is [46:11] so wellrun and I heard that last night [46:13] through Jordan Valley Water. So that's [46:15] pretty impressive. [46:16] >> Yeah. [46:17] >> So again, I want to thank you guys for [46:20] how hard you guys work and how you work [46:22] together. [46:22] >> I don't think the community understands [46:24] the grants that you guys get. There's a [46:26] lot of footwork there and that does save [46:28] a lot of money. [46:29] >> Thank you. that that 4 million we got in [46:31] that reuse, that was a real that's been [46:35] real neat. [46:38] >> Yeah, you do a great job all of you. [46:40] >> Appreciate that feedback, whole team. [46:42] >> Thank you. [46:44] >> It's nice to hear cuz we get a lot of [46:48] not nice customers. [46:49] >> Oh god. [46:51] >> Well, we appreciate your feedback. Well, [46:54] I do and like I said, I mean, like I [46:56] said, we're we're all the trustees are [46:58] really couldn't be more impressed. [47:01] >> Thank you. [47:02] >> So, okay, let's move on to our water and [47:05] sewer availability discussion. Trevor. [47:08] >> Okay. Thank you, chair and board. What [47:10] we have here is called Box Wheel [47:12] Maintenance Shop. Um, [47:15] I will [47:17] I don't have the GIS pulled up, but [47:20] hopefully we can kind of orient [47:22] ourselves here. So, we have uh the SR201 [47:27] and then there's the South Frontage Road [47:29] and you all know the Godfrey building [47:32] along there, [47:33] >> right? [47:33] >> This is just to the east of the Godfrey [47:35] building. Um the parcel sits back from [47:40] the frontage road to the south [47:45] um right here. And they're just planning [47:47] a just a smaller commercial building um [47:50] shop building. [47:52] And for water and sewer, you can see [47:56] we've got water along the frontage at [47:58] the south frontage road, but there's [48:00] also um water that comes down this [48:04] frontage road. Well, they're calling it [48:06] South Frontage Road here, but that's a [48:07] private line uh or private road to the [48:10] Godfree properties, but we have [48:13] easements for our water and sewer that [48:15] are in there. So, the recommendation is [48:18] to connect to those um each of those in [48:21] that road and bring them into the [48:23] property. We've run the fire flow and um [48:27] their water demand and everything there [48:29] looks good. We make the recommendation [48:32] of approving water. What will they have [48:34] on there? Just a building with bathrooms [48:37] in or [48:38] >> Yep. pretty simple. [48:39] >> Because they won't use any other water. [48:41] >> Yeah, the building does have a fire line [48:43] planned. Um, but other than that, the [48:46] it's just water and sewer for basically [48:49] restrooms, little shop water. [48:53] >> So, Mr. Mr. Chairman, I'd like to make a [48:55] motion to approve the uh Box Wheel [48:59] maintenance shop located 6123 West, 2100 [49:03] South for water and sewer connection. [49:06] >> I'll second that. [49:07] >> In motion, second. All in favor? [49:09] >> I [49:10] >> Thank you. [49:11] >> Okay, moving on. Project award and [49:12] agreement. Discussion possibly motion to [49:15] approve the following projects awarded [49:19] » and agreement. So, Dallas. [49:21] >> Yes, sir. Mr. Chairman, what we've have [49:23] from Twin D is the quote to do our [49:26] annual collection system rehab project. [49:29] Um, it's something that we'll work on [49:30] all summer. It's about 2700 ft roughly [49:34] of slip lines. Some are manhole to [49:36] manhole, some are just point and spot [49:38] repairs. Um, we just target these [49:41] maintenance projects based on severity [49:42] of degradation. So, we're starting this [49:45] a little earlier than we do in the past. [49:48] We're just trying to avoid some early [49:50] fall weather that could potentially [49:52] impact some of these traffic control [49:54] centers. Um, but you can see the total [49:57] quote is around 260K. I try to put in an [50:01] additional 15,000 in case they get into [50:04] there and find something that needs to [50:06] be repaired. We don't have to do any [50:08] type of change to the quote. Um, so I [50:10] just give them a do not exceed price. [50:12] And like I said, we'll just be working [50:14] on this all summer. [50:16] Now, does that keep infiltration from [50:18] coming in also or just [50:20] >> It will. If there's any areas that have [50:22] infiltration, this will keep it locked [50:24] out. [50:24] >> So, is the pipe we're slipping, is it [50:26] all concrete and spigot? [50:28] >> Some of them are tile and some of them [50:30] are concrete. [50:31] >> Is the tile eroding away? [50:33] >> Um, it's just more prone to cracks [50:37] >> and then and then the cracks get roots. [50:40] So, [50:40] >> that's just to say we have to fight the [50:42] roots coming in, [50:43] >> right? [50:46] So, [50:46] >> okay, Mr. Chairman, like to make a [50:49] motion to approve the 2026 manhole to [50:54] manhole slip line and spot repair [50:56] project with Twin D construction for the [50:59] amount of not to exceed 275,000. [51:02] I'll [51:03] >> second that. [51:04] >> Be a motion. Second. All in favor? [51:05] >> Have we used Twin D before? [51:07] >> We have. [51:08] >> Okay. [51:08] >> So, question I have. So, you know, we're [51:10] looking at 260 and like you said, you [51:12] went 15,000 over. So if they don't where [51:14] does that where does that money go Leo [51:16] if we if we don't use the you know we [51:19] budget for 275 and right here it says [51:22] 260. [51:23] >> Well it's not like we take if say it [51:25] goes down to 260 we don't take 15,000 [51:29] somewhere. It just stays within the [51:30] operating budget but if there's a a [51:33] budget item that maybe goes over by the [51:37] 15 that just kind of washes each other [51:40] out. [51:41] >> Okay. Awesome. Thank you. That makes [51:42] sense. [51:43] >> Yep. [51:44] >> Okay. Let's move on. Administration and [51:46] discussion. Possibly motion to approve [51:47] the following administration items. [51:49] Steve. [51:50] >> All right. Um, thank you. Yeah. So, this [51:52] is just our annual CCR report that we [51:55] work with Joel together on. [51:58] Um, [52:00] this is due like Leis said, we have to [52:02] have it out to the customers by July 1st [52:05] and then we have 10 days after we get it [52:06] to the customer to submit it to the [52:08] state. So, um, when at the time that the [52:14] I was putting the board packet together, [52:16] we hadn't quite finished it. So, the [52:18] only changes made to the final are the [52:21] dates on the THMS and the HAAS and then [52:24] the lead and copper. Both of those got [52:27] changed to 2025. [52:28] >> Yeah, I seen that. [52:29] >> But other than that, everything else is [52:31] the same. So, [52:32] >> looks good. Now, is any of this [52:34] available to the public [52:36] >> right now? [52:37] >> No. Once once we submit it. [52:39] >> Yes. [52:40] So it goes to everybody. [52:41] >> It goes to everybody gets a copy of it. [52:43] >> It'll be a link will be on the physical [52:47] bill and then a link will also be on our [52:51] website that goes straight to the CCR. [52:54] Um [52:56] and then anybody that requests comes in [52:59] whatever can get a paper copy. [53:02] So [53:03] >> awesome. Looks pretty good. Look. I [53:05] think it looks awesome. [53:06] >> We do add Jordan Valley's water quality [53:09] data to ours. [53:11] >> Yeah, [53:11] >> also when we send it. [53:13] >> That's also in there. But [53:15] >> is Jordan Valley in there now? I didn't [53:17] notice. [53:17] >> What's that? [53:18] >> Jordan Valley isn't in there now, is it? [53:20] It's not [53:21] >> Oh, yeah. On that new one. Yeah. [53:22] >> Yeah. [53:23] >> But on the one we send in, it will be [53:28] » okay. Does someone want to approve it? [53:30] >> Sure. Mr. Mo Mr. Mr. Chairman, I'd like [53:33] to make a motion to approve the 2025 [53:36] consumer confidence report. [53:38] >> I'll second that. [53:39] >> And a motion second. All in favor? [53:40] >> I. [53:41] >> Okay. Dallas. [53:43] >> Yes, sir. Mr. Chairman, this is just the [53:46] municipal wastewater planning program [53:48] survey. Um, it's an annual thing that me [53:50] and Trevor and Leo work on each year. It [53:53] does require a board motion. um just [53:56] surveys, you know, age of our equipment, [53:59] projects we're working on, population of [54:02] the town. Um and then we submit it [54:05] annually around this time. [54:08] It's it's a survey that the board has [54:10] seen before. Not a lot changes. Um [54:13] >> the format looks different. Usually it's [54:15] a print screen. [54:17] >> Yeah, it's tough. [54:18] >> This year they gave us a report to fill [54:20] out like this, so that was good. [54:26] I think I like this better. It's way [54:28] better. [54:29] >> That's what I was going to say. I like [54:30] this. [54:33] >> A lot faster to fill out. [54:34] >> Yeah, it is. [54:41] » Any questions? [54:42] >> Good. [54:43] >> Okay. Well, we want to uh approve this. [54:47] >> Okay. So, Mr. Chairman, I'd like to make [54:50] a motion to uh approve the 2026 [54:54] municipal wastewater planning program [54:57] report. [54:58] >> I'll second that. [54:59] >> Motion second. All in favor? [55:00] >> I I [55:01] >> Hey, just a heads up, you guys. Um I [55:04] don't know how much copper we've got [55:05] laying around, but over at Jordan [55:07] Valley, we've they've been getting we've [55:09] been they've been getting hit quite a [55:10] bit for theft. [55:12] >> Oh, wow. [55:12] >> And it's actually in their new building [55:13] they bought in West Valley City off [55:15] Redwood Road by the Redwood Drive-In. So [55:18] they put some uh what's them cameras [55:21] called the light for hunting? [55:24] >> Motel cameras out. [55:26] >> And it's funny is the second time they [55:29] caught the guys and they arrest them. [55:31] The guys came back again. [55:32] >> Same guys. [55:34] >> You're kidding. [55:34] >> Have we had any theft? We haven't had [55:36] any. [55:38] >> We're pretty secure on [55:39] >> um and we really don't use a whole lot [55:41] of copper anymore. Once in a while we [55:43] do, but we don't keep much on hand. [55:45] >> Okay. I just want to make sure that we [55:48] kind of keep an eye on that cuz it's [55:50] getting crazy again. We've had that down [55:53] at the ballpark and [55:56] >> Okay, Andrew discussion for um for [56:01] season for operating season uh working [56:04] schedule change. [56:06] >> Yeah. So, if you'll just remember, board [56:08] had uh the idea that maybe we help the [56:11] operators out through the summer by [56:13] getting in earlier, getting them out of [56:15] the heat uh as a safety concern. Um so, [56:19] we just wanted to bring this back to the [56:21] board and just make sure that we're all [56:24] still on the same page. We're [56:26] anticipating starting this summer [56:28] schedule for the operators, Steve, [56:30] Dallas, and myself on June 1st through [56:33] August 13th. the and the on call [56:37] operator that week would still continue [56:39] to work the normal schedule of 7 to 5:30 [56:42] so that we have coverage for that last [56:45] hour of work. [56:47] >> And what about our front office? Would [56:49] they work? [56:49] >> They're going to continue the front [56:51] office and their managers and Trevor and [56:54] Clint Dilly would continue with the name [56:57] same 7 to 5:30 schedule. [57:00] >> Okay. So, you know, I I'm the one, you [57:04] know, I'm the one that brought this up [57:05] about wanting to do this. The only [57:07] question I have and I I just want to [57:08] make sure I I can support this again, [57:11] but that, you know, I don't want to sit [57:13] and see our operators hanging out till [57:15] 7:00 in the morning and and uh and then [57:19] decide to get out on the streets. And if [57:21] that's going to happen, I we'll just go [57:22] back to the regular schedule. And I [57:24] think we had that discussion last year. [57:27] >> Uh we need to we need to get moving. We [57:29] need to get here, get going. [57:31] And it is it's getting way light. [57:34] >> But I I just I just don't want to see us [57:37] lolly gagging around going down to the [57:39] gas station, going to the doughnut shop. [57:41] >> Yep. [57:42] >> And uh and and you know, I mean, because [57:45] at the end of the day, we're all paid, [57:46] including myself. We're all paid by [57:48] taxpayers and we all need to look at [57:50] that. [57:51] >> I was hoping at six now. [57:53] >> Yeah. [57:54] No, I'm in agreement and I think the [57:55] managers are all in agreement with that they'll get there and they'll get [57:59] out on the roads as quickly as possible [58:01] >> because I think this is a morale deal to [58:04] form two, but in return with the board [58:06] doing this for the them, they got to [58:08] give back, too. And and and I'm going to [58:10] be honest with you, if I have any [58:13] complaint from the public, we'll just go [58:15] back to the 7 to 5:30. [58:18] >> I think we're in agreement [58:19] >> and I I'm sure the board all agrees. [58:22] >> Yeah. But I um you know with the office [58:26] I mean if you think that schedule you [58:29] know 7:00 to 5:30 I thought I thought we [58:32] went [58:34] >> with them I thought we went from 6:30 to [58:37] 5. No never was okay. [58:39] >> Uhuh. We didn't change and then the on [58:41] call person would stay that extra hour. [58:43] Okay. [58:43] >> Or it would just shift to the [58:45] >> Okay. Cool. [58:46] >> Worked out. [58:47] >> I'm totally in support as long as I said [58:49] as long as we don't have any feedback [58:51] from the community. Okay, great. Thank [58:53] you. Appreciate your guys' support on [58:55] that. [58:55] >> Our next board meeting will be June 11th [58:59] at 10 o'clock, 2026 here. [59:04] Um, I don't think I'll second it. [59:07] >> Okay. [59:10] It's been motioned second. All in favor? [59:13] >> I had a conflict. That's why I called [59:16] Clint. I called you on [59:18] >> because you're going to be gone. Well, [59:20] the the 9th of July, I'm trying to ask [59:23] if we can move it to the 16th in July. [59:29] » I don't care. [59:30] >> We can look at that. Um, [59:34] >> I'm just trying to do it ahead of time. [59:36] So, I've got the only big enough truck [59:38] to haul the all their food and [59:41] everything. [59:41] >> And if you you know what, I don't have a [59:42] problem if you if you have to miss the [59:44] meeting. Me and Danny can take care of [59:46] it. [59:47] >> I don't want to miss it. I know, but I I [59:49] know you don't, but I'm just saying [59:52] >> you do get a break, too, don't you? [59:54] >> I don't need This is fun. [59:57] >> Yeah, we can we can move it. Don't [59:59] worry. [59:59] >> If we can move it, that's great. [1:00:01] >> Um, just a thought or a reminder, I [1:00:03] guess. June's usually our certified tax [1:00:06] rate bump. [1:00:07] >> Yes. [1:00:08] >> And sometimes we don't have this [1:00:11] certified rate. They're supposed to It's [1:00:13] supposed to be out on the 8th. So hoping [1:00:15] it's done and ready by the 11th, but if [1:00:18] we don't, we might have to have a [1:00:20] >> that's [1:00:21] >> special meeting in June, maybe. [1:00:23] >> So that might be like the 15th or [1:00:25] something. [1:00:25] >> Uh we have to have all of our paperwork [1:00:28] into the counties or the state by the 20 [1:00:32] or 22nd. So it's got to be around then [1:00:35] if it's going to be [1:00:36] >> you'll just give us a little Okay, [1:00:39] >> I'll contact you. But [1:00:41] >> they always cut it right to the limit. [1:00:43] >> That's confusing. [1:00:45] remember a few times it comes in during [1:00:47] the board meeting. [1:00:48] >> If you do have to have a special [1:00:49] meeting, the law has changed and so you [1:00:51] could do that completely electronically [1:00:53] now if that would be easier and save the time and money of doing this [1:00:57] physically because I imagine if we had [1:00:58] to do a special meeting it would be like [1:01:00] five minutes. [1:01:01] >> Yeah, [1:01:01] >> that wouldn't be a big thing. [1:01:04] >> Okay, [1:01:04] >> that would be do electronic. Okay, just [1:01:07] let us know whatever. [1:01:08] >> So, are we in need? We're not in need of [1:01:11] a closed door meeting today. Am I right? [1:01:13] No. [1:01:14] >> Okay. So, we're going to [1:01:16] uh Does [1:01:19] We don't have that. Um [1:01:20] >> We're good. [1:01:23] >> Yeah, we're good without a post. [1:01:25] >> Okay. Does uh someone want Okay. So, do [1:01:29] we [1:01:30] >> So, does anybody have any any stuff that [1:01:33] they would like to bring up? Hey, sir. I [1:01:36] noticed you're you've came into the [1:01:38] meeting and we're really close to being [1:01:40] done. Is there anything that you want to [1:01:41] address to us? I'll talk to [1:01:44] >> Okay, awesome. [1:01:46] >> Great. [1:01:48] >> Nope. I just want to make sure. I didn't [1:01:49] want to [1:01:50] >> Thank you. [1:01:50] >> No problem. [1:01:52] >> So, does the does the [1:01:54] I was going to say council. Does the [1:01:56] board have anything that they want to [1:01:59] address um or anything? Nathan, do you [1:02:02] have anything you want to address? [1:02:04] >> No, but I I would like to chat with you [1:02:06] and Trevor really quickly afterwards [1:02:08] about [1:02:08] >> Okay. Absolutely. [1:02:09] >> Okay. So I I'd like to make a motion to [1:02:12] adjourn. [1:02:14] >> I'll second that. [1:02:15] >> Motion second. All in favor? [1:02:18] >> I 11:02. [1:02:19] >> I think this is a record for us [1:02:20] >> at 11. [1:02:21] >> Yeah. Approach.