[0:00] I'll go ahead and call this meeting to order and ask for a roll call please s [0:06] okay could everybody please unmute their microphones before I [0:13] start okay council member Kevin Reed present council member Alex [0:20] McCree here president Jennifer Harrington here council member Jeff [0:28] homb present council member Dr David Gua here and we [0:34] do have a quorum okay um let's go ahead and do the [0:39] Pledge of Allegiance in a moment of silence [0:44] um a pledge of allegiance to flag United [0:50] States to the it [0:57] stands under God [1:03] Justice for [1:12] All let's go on and move on to approval of the agenda was there anything from [1:19] staff no no modifications at this time except uh unless you want to defer the [1:25] reports now that we've wasted about 30 minutes of the time um what's is what [1:29] what's the will of the Council on that it'd be up to staff I'm okay with [1:34] deferring reports um if we could maybe just um move those to the first of the [1:40] month next meeting we'd have two next month we'd be glad to do that if it's [1:44] okay with with [1:47] Council okay with me okay I'm seeing thumbs up but seeing approval yeah uh [1:54] we'll just handle the the meeting portion the action portions of the [1:59] council okay sounds good um I would go ahead and uh entertain a [2:05] motion to approve without the reports so [2:11] moved I'll second I have a motion in a second to go ahead and approve the [2:16] agenda with the um reports being removed for this meeting all those in favor I I [2:25] I I okay motion carried um were there any [2:30] public comments any [2:36] public if you have somebody in the public that's not on here if you want to [2:41] unmute if you're not uh don't have an item that you're speaking to [2:54] specifically doesn't appear that there's any public comments okay I'll move on to [2:59] the consent [3:03] agenda I would entertain a motion for um the consent agenda at this [3:11] time so moved [3:15] second I have a motion in a second on the consent agenda I would go ahead and [3:24] um put it to a vote at this time all those in favor say I I I I I [3:34] motion carried on to um new business 7A Burns and McDow water and Supply [3:45] planning good evening mayor and Council can you all hear me yes yes yes um as [3:52] you know the city ma have been working hard over the last couple years to U [3:58] gain and and require additional water rights and working on getting a third [4:02] well and uh due to the growth our city has experienced and forecasting over the [4:07] coming years it's becoming a point where we need to become a little more [4:10] aggressive in pursuing additional water rights and water [4:14] infrastructure um we were approached by Burns and McDonald to assist us with [4:19] these efforts the burns and McDonald McDonald team consists of [4:23] hydrogeologists Engineers and experts in the [4:26] regulatory in regulatory operations uh collectively as a team they've got over [4:30] 60 years of experience working for municipalities and the regulatory [4:36] agencies that make the decisions um regarding water rights and water supply [4:42] infrastructure they've got years of experience working with many cities to [4:46] assist in their water supply efforts including the city of wiah city of Hutch [4:50] city of Valley Center mcferson and many others uh the city manager and I have [4:56] met with Brian and Danel over several different occasions and we've got over [5:00] some of the some of their approach to helping us with our water rights um Nick [5:06] and I have been pleased with those conversations I'll let um Brian and [5:10] Daniel kind of go over those with you a little bit but um they'll be able to [5:14] help us a little bit with our existing water rights as well as um help us find [5:19] additional water well sites and apply for water rights applications and [5:23] they've got lots of experience working directly for those regulatory agencies [5:28] that make those decisions um the Bruns McDonald team um in my and [5:33] Nick's opinion would Prov would provide the city may as a topnotch and highly [5:37] experienced group of Consultants that would put us in the best possible [5:40] position to uh acquire more water rights and put our water system in a a much [5:45] better spot um with that I'll let uh Brian Meyer uh kind of go over a little [5:51] bit of their expertise some of their qualifications and share with you all um [5:55] their approach and what they're going to do to help [5:58] us thanks Nick I really appreciate it um Daniel you want to go ahead and share [6:02] your screen and bring the PowerPoint [6:10] up thanks Dan yeah okay you guys can see that okay [6:15] perfect yeah hey wanted to express our appreciation for the opportunity to be [6:20] here tonight and and talk a little bit about Burns Mack our experience and in [6:24] our approach um Nick did a really good job of describing a lot about Burns and [6:30] Mac um but I wanted to go into it just a little bit deeper and and then open it [6:36] up for questions certainly um you know one introductions I'm Brian Meyer with [6:42] Burns Mack been doing water supply planning for um going on 40 years now um [6:48] all predominantly in Kansas and in in Oklahoma spent the last 25 years with um [6:55] Burns Mack um my role on this project is kind of twofold [7:00] it's not only is the water supply planner but it's also to make sure that [7:04] the project stays on track meets your goals your expectations whether it's in [7:08] regard to budget schedule project needs at all times so be in close [7:14] communication with with Nick to make sure that it is staying on track with [7:18] that Dan would you like to introduce yourself hey thanks and I I would [7:22] normally have my camera on but I am recovering from the flu so I didn't [7:26] figure I wanted to share that that visual image with everybody but um um [7:30] thanks for letting us join this evening I um I've spent about 15 years in the [7:34] industry and I've dedicated my career to serving municipalities just like the [7:38] city of ma and and and helping folks um get to that next phase in their in their [7:43] water supply um portfolio and and that's range from traditional you know develop [7:47] a single well and you know serving small communities to to well fields that you [7:51] know are over 15 20 30 you know 100 million gallons a day so um that range [7:56] of experience is has been right here in Kansas mostly but across the United [8:00] States and then again it's a privilege to serve um water is one of those those [8:04] critical aspects that uh is going to help you guys continue to grow so um my [8:08] role in the project is going to be on the technical lead side of of [8:11] hydrogeology that's uh that's my main focus but uh also on the project [8:15] management side making sure we're headed down paths that are going to be [8:18] successful in anything that we pursue uh for additional water rights um and then [8:22] uh also on the technical side for welld designed and things like [8:26] that excellent thank thank you Daniel couple other folks that on our team that [8:31] I wanted to mention that aren't with us here today uh Dave Barfield um is with [8:36] Burns Mack he's the former chief engineer for the Division of Water [8:39] Resources um once he retired he came over to work part-time with Burns Mack [8:43] and he is a um a real asset to the team when it comes to managing water ride [8:49] issues and and dealing with challenging situations so he's a great resource to [8:54] have we also have Matt Gallagher Matt's more on the infrastructure side as we [8:58] know if we Iden identify a location uh that's suitable um for production from [9:04] from a water quality water right standpoint the connections to the system [9:08] and how that site's developed are are critical so Matt's on our team to help [9:12] with that aspect of it uh just just a little bit of overall philosophy and it [9:16] and it kind of says it here is that our typical water supply planning process is [9:21] to optimize what you have to make sure that it's being used as efficiently and [9:26] as effectively as possible and often those initial U measures are non- [9:33] capital projects anything that we can do administratively to modify the water [9:36] rights we'll talk about that a little more detail and then we move on to [9:41] things that would be um adding additional Supply that have a [9:46] infrastructure addition or cost to them so um the easy the low hanging fruit [9:50] first to provide the highest value to the community [9:54] so next slide Daniel [10:02] as as Nick mentioned earlier um Burns Max is 125 year old company we've been [10:06] in witto area for 30 years but decades working for communities around the state [10:12] of Kansas and it really it really does cover pretty much the full geography of [10:17] the state and um there's active projects in a lot of these communities right now [10:22] so this is kind of an ongoing process we develop in Partnership that um continues [10:27] over time when we get the opportunity unities serve a [10:30] community um the the column on the right the the agencies that that Nick [10:35] referenced earlier as well that's because of the work that we've done over [10:39] the years we've developed those relationships and those have been [10:43] critical in making sure that we can move a project from conception to [10:48] implementation effectively and understanding what the um pitfalls might [10:53] be as we move through that is there a permitting issue is there a is there a [10:58] water qual issues or want a quantity issue making sure that we have a good [11:03] dialogue with all of the um permitting agencies and the planning agencies um [11:09] we've got the Kansas water office on there and as you know we'll talk a [11:13] little bit more about this in a minute too um they've taken a more significant [11:18] stance in recent in recent um in the recent year the last 12 to 14 months in [11:24] water supply planning and providing funding for projects so they are a big [11:29] player in this as well as as is the Bureau of Reclamation so next slide [11:36] Daniel just one of the things with with those Decades of experience and and the [11:41] benefit I think it brings to Mae is that you know each and every project is [11:45] unique so you got to take a little bit different approach take a different um [11:50] perspective on what success is and how to get there um just wanted to throw up [11:54] a few examples of projects that are ongoing now or have been completed in [11:58] the in the recent recent pass hay that's that's a similar wellfield um in Edwards [12:04] County um and about a 65 mile pipeline that will go to Hayes and um be their [12:11] future water supply to to support their Community uh Dodge City take a little [12:16] little different approach and um with the depletions that we're all seeing in [12:21] the ogalala out in Western Kansas they they saw the writing on the table that [12:25] they really needed look hard at Wastewater reuse so that is the actual [12:30] implementation process for using Wastewater to recharge the aquifer in [12:34] the vicinity of some of their Municipal Wells and still meet all of the water [12:39] quality standards um of kdhe um Ark City that was a new water [12:44] treatment plant um that would is now in operation and it was designed to be [12:51] compatible with their changing water suppli as they started to see their [12:55] chlorides increase they needed to change the the treatment technology they were [12:59] using so um M first that's one that just got completed late last year um once [13:06] again a wellfield um to provide uh water supply for a declining aquifer in their [13:12] area as well um in a more sustainable area so they developed a well field [13:17] about um 20 miles south of mcferson and um we built the pipeline and a treatment [13:24] plant to manage the water quality that was going to come from that wellfield [13:28] that um in mcferson so all different types of projects all took a little bit [13:33] different approach um and all of them took a lot of planning to go in to make [13:39] sure that it was the right project for the community um and then then you do [13:43] the project right so right project first and make sure we execute it [13:48] correctly next slide Daniel thank you um just wanted to talk [13:53] about something that's really come to the Forefront in the last oh [13:59] 24 months I mean and it's because of the escalation we've seen all of the supply [14:04] chain challenges um projects sometimes take [14:08] longer to get done we start focusing on funding um at the beginning of the [14:12] project once we understand what the needs are what the goals are and what [14:16] the nature of the project is we start to think about what what funding sources [14:20] might be out there and and of course we' got a lot of the traditional sources the [14:25] srf um loan funds but we also look for Grant funds and [14:31] we've been fairly successful over the last couple of years these are just some [14:35] of the examples um mcferson BPU project came in it right right out of covid um [14:43] and saw some tremendous escalation so we were able to go and get some emerging [14:47] contaminant funding and um some CDs funding um is in the works right now to [14:53] bring them about $6 million which hopefully will get um their take some [14:58] stress off their budget couple of other success stories and the [15:02] reason I wanted to point those out is because each one's different Garden City [15:07] really went down the road of CDs or congressionally directed spending um and [15:11] it was compatible with their project Dodge City um went with Bureau of recre [15:17] funding and that allowed them to access Bill Kansas or the infrastructure Hub as [15:22] well so um two different types of funding two different types of projects [15:27] but we keep the keep the uh the everything on the table until we know if [15:32] there's something available and if it'll fit and then we do what we can to go [15:35] after it so that's that's a commitment we [15:38] make next slide Daniel so this this is really kind of [15:43] the project approach and and Nick did a good job of of describing it as well and [15:48] it goes back to that that traditional philosophy that we apply to water supply [15:53] planning projects you know and that's looking at the water rights of your [15:56] existing Wells first um and one of the things that we are planning to do is is [16:01] make a change so that each well serves as a standby for the other well so that [16:07] if one well goes down you can produce the water rights um in total from both [16:11] Wells from a single point um little more redundancy reliability in that and [16:17] that's that's a relatively easy change the other significant thing with the [16:22] existing Wells to optimize is is to look to see if there is um a additional water [16:29] supply available at one point in time there was because I think applications [16:34] were actually filed a number of years ago um for a number of reasons those [16:39] were never seen through to completion um so we would take a look at that again [16:44] make sure there's yield available and If there is apply for additional water [16:47] rights at the existing points of diversion um so technically that would [16:53] require no improvements to those Wells we just take a look at the productivity [16:57] to make sure that they can visit Bally produce the water rights that would be [17:01] obtained for those Wells the um the next step is the [17:05] addition of of a new well or well sites um and once again there we take that [17:11] conservative approach and I think the initial screening has already been been [17:15] done and been positive in that it looks like it's in a reasonable place um from [17:20] a water quality and quantity perspective and could be permitted um now the proof [17:26] comes in going out and actually collecting the field data um where you [17:30] would do the test drilling collect formation samples do the water quality [17:34] um collection water sample collection and then do the pump testing what is the [17:39] well going to yield um and then make and then that becomes a decision Point are [17:44] all of those factors um in line with with what you need that well to produce [17:49] and what water quality expectations you have for your for your utility in your [17:54] community so and then at that point if everything's a go then it moves into um [18:00] design and construction of that particular site at the point where you [18:05] build the confidence to know you're going in the right [18:07] direction um in in this scope we also um factored in some of the U flexibility [18:15] because there are opportunities as water rights um are identified and or water [18:22] right owners come forward are interested in in some sort of um partnership that [18:28] we can evaluate those and make sure we understand is there something that's [18:33] viable is there something that's valuable for the community so those so [18:36] that level of effort is kind of on as assigned basis as they would be [18:42] identified uh and we' be asked to evaluate them then we we would be able [18:46] to go forward with that so that's what um that final task is and then I guess I [18:53] would just sum that up with I mean that's the commitment going through that [18:57] process is to get you to a place where you do have that long-term sustainable [19:01] water supply that's going to meet the community growth and future needs so [19:07] with that um Daniel and I would be glad to take any questions um about um our [19:13] experience or our [19:17] approach just uh really quick in the event that this meeting runs out in two [19:23] minutes um I think uh Tristan has extended the time but I saw a timer that [19:27] said there was five minutes minutes left so um look at that that I don't know [19:32] whether that's fixed or not so um just in case that happens we'll send out [19:37] another invite to everybody on this list [19:47] apologize yeah I I don't have any questions I think it's a good deal [19:51] personally there are there's obviously some significant cost with this but [19:56] securing I think the securing the future of our water rights is pretty [20:00] critical um I think Nick kind of Hit the hammer on the head um we want to have [20:05] somebody that's going to guide us through a process to guarantee our [20:09] future of our water rights you you as a council [20:13] identified um you know securing those water rights is a critical need um at at [20:19] our recent Retreat and so um I think uh in my mind just based upon conversations [20:26] we've had with Burns and McDonald I I think their approach gives us the most [20:31] certainty going forward and um uh we uh I would say uh we there there's a little [20:38] bit of work to a little bit of work to do on our contract with Burns and [20:42] McDonald but um uh if if you were to approve it today it would be subject to [20:48] Legal review uh with the city attorney uh but and when you talk about the scope [20:53] of their work and some of the deliverables I think they meet [20:56] everything that we need to do uh going forward as a as a city [21:05] organization [21:10] okay does anybody else have any other questions Madam president I would [21:16] entertain a motion I would uh move that we approve [21:22] the agreement with Burns and McDonald for water rights Supply planning subject [21:27] to City attorney's approval and authorize the mayor to [21:33] sign I'll second we have a motion in a second on [21:39] um the [21:44] uh McDonald for the water rights uh Supply planning subject to the city [21:50] attorney's approval and authorize the mayor city manager to sign all those in [21:54] favor say I I I I I those [22:01] opposed motion carries on to um item 7B May City of ma [22:10] development agreement for future development Brian and Daniel thank you [22:14] very much for your time this evening we appreciate you hanging in there thank [22:18] you very much [22:26] appreciate okay um I'll kind of start this out here um I [22:31] don't know if you want to chime in uh Mitch as [22:34] well you the um so as we look at uh our moving forward as a community when we [22:43] work with developers particularly residential developers um there are um a [22:49] number of things that requirements that we have during the development process [22:53] and um something that's not unusual that I don't think U a has done near as much [23:00] as other communities is to come up with a [23:05] development agreement when we pass um when we work to approve um uh [23:15] petitions and uh those those de the development agreement and what a lot of [23:19] communities use that for is it's a guide guidance tool to explain the [23:24] expectations that we have of our develop ERS in our process and um it's it's not [23:32] uncommon we did it when MC in mcferson where I was at and there's a number of [23:36] communities around us that do the same thing um what we have before you if [23:41] you're able to click on that link would be a a draft of a template that we'd [23:47] like to utilize um that kind of lays out some of our expectations and I don't [23:52] know uh Mitch are you on the line did you want to kind of just hit on some of [23:56] the high points of uh of that sure Nick can you hear me [24:01] okay yes okay uh public improvements is and assur go with it uh one of the [24:09] things we wanted to make sure that that was key in this is like [24:14] uh you know efforts for a rose control residential areas make sure the [24:19] compliance they confirm with the compliance on that um a concrete wash [24:25] out area that meets Nick veering was key in [24:29] this he said you know make sure that it meets Environmental Protection Agency [24:32] guidelines and then we uh that we have that in place to [24:39] where they can wash out their trucks and uh in in a timely manner and all that [24:44] and not make a huge mess um then you know responsibility for [24:49] infrastructure damage um Nick Ving also brought to our [24:54] attention that the uh damage that's being caused on site by [24:59] ERS um and and the lack of attention to detail in that area so we wanted to [25:04] cover that and then permitting and things things of that [25:09] nature I think that covers it for the most [25:13] part we did work with uh with with u the City attorney on this Pro point that was [25:20] brought up to me by one of the council members I think is a really good point I [25:23] just we just didn't get have time to get it into places we also have a payment [25:28] structure and an set of expectations that we have um I think this is this is [25:35] I'm not asking we're not necessarily asking for your approval we wanted you [25:39] to show the process that we're going forward today um if if in theory a going [25:45] forward with a developers agreement is something that that um you guys are in [25:51] favor of we still got a lot of work to doing this and we also want to talk [25:56] about our current processes when when it comes to um securing um securing uh [26:04] commitments from a financial standpoint currently we require letters of credit [26:09] and we only dismiss those letters of credit once they've reached a certain [26:13] level of I think 35% is what they are 35% uh tax credits [26:20] that apply and um once that once the development's reached 35% completion [26:26] we'll dismiss those um dismiss those but they have to have [26:30] constructed and actually have permits uh actually certificates of [26:35] occupancy on 35% of the structures before we'll dismiss those so I think [26:40] we'd incorporate some of that language into there actually when we started to [26:44] go back and look we couldn't find some of the policies that apply to that so [26:48] that part will have to be something we incorporate but I think it's important [26:52] to incorporate those aspects of it as well so this is a just to understand [26:57] this is a working document it's something that will change over time it [27:01] may not be the exact for every developer but um some of the things that are in [27:06] here I think should be consistently uh done across the board for [27:11] developers I just uh today was probably as much about [27:16] uh Mo giving staff some direction to move continue to move forward with this [27:21] process um I I really think it it's there's a lot of things that are [27:26] mentioned here that are help that are mentioned in other aspects whether it's [27:31] the erosion control requirements for the city that are in different documents and [27:36] it makes reference to those but it gets it all into one document that I think [27:40] the developer can see are there any questions that anybody [27:47] has um I have a comment I definitely think this is the way we need to be [27:51] moving I think that um with all the developments we have already in progress [27:58] and as much as we've been growing and building I think some of this stuff is [28:02] kind of been all over the board and each time we're presented with a new uh [28:07] Builder coming in we have to reinvent the wheel almost and this would make a [28:11] basis Baseline for us to start with to be able to just say this is this is [28:16] where we start this is what we have to work with these are what our [28:19] expectations are and I think um I think it's definitely [28:25] necessary we' tried to identify some of the common issues that we frequently [28:29] deal with and that's one of the reasons that I think it's you know this may be [28:33] something that does change over time as we identify new new trends that we're [28:37] seeing from Builders or developers um but I think uh this gives you at least a [28:42] snapshot of what we're looking [28:48] at any other [28:56] thoughts so far so good yeah okay we'll just uh uh we'll [29:04] continue with issuing these so you'll see one of these likely the next time [29:09] that you get um next time we have a brand new [29:13] development that doesn't have any petitions already issued is where you'll [29:17] probably see this um so a lot of the a lot of the developments that are already [29:21] in place um we probably will not incorporate this so it'll just be new [29:26] developments going forward [29:30] if there's no other questions I'd entertain a motion to recommend staff to [29:35] move forward with drafting the [29:40] template I guess my my question is are we is the motion to move forward with [29:46] drafting a template or to move forward with the template that was presented to [29:51] us I think it'd be move forward with the template that's presented and make any [29:57] improvements as as staff sees [30:01] fit so I'd be on board with that but I do think it's important to get some of [30:08] the payment stuff in there as I had emailed to you Nick so I don't know if [30:13] it needs a final Council approval after that or not but um I think that's an [30:20] important piece of it I I think uh the first one you see will have some of that [30:24] language in there um uh so these will be approved whenever you see a development [30:31] so um what what we'll likely do is we'll put out some of that information that we [30:35] plan to incorporate into there we just don't have it in a policy form at this [30:39] point U and we're able to find that current Administration was able to find [30:44] so um we we will get some language out there that you're able to [30:49] see and um and the first time you see one of these develop development [30:54] agreements that happen at the time of development uh hopefully you'll see it [30:57] in there [31:00] and and Tom's read through all this stuff right so we're all good with that [31:03] too with him uh yes that's [31:08] correct okay yeah I want to make sure that we got our tees are crossed and our [31:12] eyes are dotted on all this here because you know we're gonna get some um some [31:16] Kickback we've uh we've met met on it probably three or four times internally [31:21] as a staff and we've added to it every single [31:25] time okay so uh not to be difficult but if uh if an agreement every time an [31:32] agreement comes up with a developer if that's going to be put in front of [31:35] council is there really any reason to take action [31:39] here uh I I'm okay if you don't ultimately take action but I just want [31:44] to make sure we're headed in the right direction and that everybody's in [31:47] agreement that this is something we should be looking to do with all of our [31:50] residential developers I I would maybe it's more [31:54] consensus I would Echo Jennifer's comments that yes absolutely think we're [31:58] moving in the right direction Nick I think Nick I think one [32:03] other point to make that's relevant is I don't know if we noted it in here or not [32:07] but we also talked about having that uh pre-development meeting with the [32:11] developers that's something that's not happening right now as well that would [32:14] go over all this in person with the with the [32:18] developer I think that's important as [32:22] well we just want to have a different we want to lay out our expect expectations [32:27] so we think this is the best way to do it um ultimately and and to go over this [32:32] whenever we do meet with the developer I think is [32:38] important I important as we move forward some of these are expectations of their [32:44] builders that that are out there working in here and so a lot of these uh you [32:49] know the best person to hold those Builders accountable is going to be the [32:54] developer in a lot of cases [33:00] I [33:04] agree so we don't need to have a no as as long as there's no there no no [33:11] concerns with us moving forward there's not really any action you need to take [33:14] on [33:17] this okay I'm I'm good with it okay as long as you do you know what Jeff and [33:24] Jennifer said so I'm good with that we got to have certain [33:30] standards okay with that being said um I would go ahead and have us move on to [33:36] business 7c Evans building project series two 2019 IRB Amendment [33:45] resolution okay um I'll try to [33:51] um we were approached by um Evans building and by our bond attorney [33:58] um Gilmore and Bell uh that Evans building has an interest in selling off [34:04] a portion of their property and for uh we currently have an IRB standing IRB [34:11] with Evans building and Evans uh I don't know I'm [34:17] not exactly sure where where we're at in uh and terms of [34:22] that IRB but we're several years into that [34:26] IRB and for that reason um what we need to look to do is to amend the 2019 IRB [34:35] that we had currently with Evans building to remove that section for [34:40] which they plan to develop uh it's approximately 1.5 Acres I know uh on [34:46] this call we do have Hunter Lem monion that is um the realter assisting in this [34:54] process I don't know if you have anything else to add Hunter but um [34:59] ultimately this is a this is just a methodology that we do to remove the IRB [35:04] portion from uh Evans building and it the IRB that's currently in place would [35:11] just apply to the section that that that Evans building continues to [35:16] own there's a what basically we're asking for is to pass this resolution to [35:22] mend those documents and then um any of those supporting documents that we [35:27] authorized signature of those as well and the May mayor to sign any of those [35:33] documents you want to chime in Hunter on anything or did I did I represent that [35:39] correctly I think you represented that well um no that's exactly what we're um [35:44] trying to accomplish here um a 60,000 square foot piece of property that Evans [35:49] currently owns or akj Holdings um and ultimately there is a another type of [35:55] industrial user that has shown interest in coming into that industrial park and [36:00] yeah I think everything else that you had shared there is [36:07] accurate once again this does have has had the legal review um uh we've heard [36:12] from uh not only from our bond Council but our City attorney and it's a very [36:16] similar step we did when we went to acquire a portion of the property Evans [36:22] owns for our wellsite except in this case we're not the city's not purchasing [36:27] ing it's it's someone it's a private uh property owner that's that's [36:34] acquiring this section of the [36:40] property any other questions do we know what type of [36:45] company is acquiring at this at this point I don't [36:50] think they've disclosed that um okay I just want to make sure it fits [36:56] kind of what our goal they realize that there are some [37:00] requirements that come along with the zoning and the industrial park I believe [37:04] and uh you whatever whatever user it is I think is identified that um I I did [37:11] have I did feel the call from the owner of Evans building at one point uh to ask [37:17] about um another user and whether they' had availability of water and sewer for [37:24] that location so um without um without sharing that information we did [37:30] talk a little bit about zoning as well [37:38] so any specials or anything that would be associated with that property would [37:43] be transferable to the new owner is that yeah in this case I would assume that [37:48] would be the case um do you want us to address that Hunter is is [37:54] that new owner that that is correct nope everything you said [38:00] there um essentially throughout this we would have kind of a respread type of [38:05] agreement where they would proportionately share what's the current [38:09] special assessments that are on that property so they would they would take [38:12] portion in [38:16] that unlike on the property we took where we weren't accessing into the [38:21] utilities um um we we moved all of the specials onto that lot and it would be [38:27] split between this property and and the regular Evans building [38:33] property that's the other difference between the property we [38:39] took okay is there any other questions or [38:44] discussion if not I would entertain a motion uh Madam president I would move [38:50] to pass the resolution to amend certain documents relating to the series 2019 [38:56] industrial revenue bonds and authorize the mayor to sign documents connected [39:02] to said [39:05] documents second I will second it is that David or was that Kevin has [39:13] Kevin I think we both second okay [39:21] Ty so at this point um you know we'll defer the reports we'll bring those [39:26] reports to you at the March meeting the March 3rd meeting we still have to [39:31] vote that's okay um we have a motion and two seconds on on uh the recommendation [39:39] to pass the resolution to amend certain documents relating to the series 2019 [39:44] industrial revenue bonds and authorize the mayor to sign the documents [39:48] connected to the set amendments all those in favor say I I I those opposed [39:55] motion carries onto reports sorry Nick uh I'll just say uh I think you [40:02] guys decided at the beginning of the meeting we'd defer there this reports so [40:05] we'll bring those on the March 3rd um we don't have a lot of items for that [40:10] agenda so that probably will be workable um to include those updates at that time [40:16] I appreciate that I can't believe this weather this is [40:20] crazy there are no executive sessions um so at this point if uh if a motion would [40:26] be to go ahead and move forward with adjournment that would be [40:30] appropriate I I would move to adjourn okay we have a motion [40:36] to Second Dave Dave [40:43] second I have a motion from Jeff and a second from David to go ahead and [40:48] adjourn this meeting all those in favor say I [40:52] I and once again I apologize for all the inconvenience that we had with getting [40:57] set up Lessons Learned unfortunately so de you have to learn them the hard way [41:02] and I promise you our next experience will probably hopefully be better and [41:06] hopefully we don't have a weather related concern like this anytime in the [41:10] near future but you know we're in Kansas so who knows I appreciate you guys [41:15] sticking with us and letting us get through it yeah this is still better [41:19] than coming down there yeah espec with everybody having [41:23] you know the flu and all that stuff going around so [41:27] we will go ahead and get this uh we will go ahead and get this onto um the uh our [41:35] Facebook feed hopefully the clean version of this one we actually started [41:38] the meeting so hopefully I think it's it has been [41:42] recorded so we should that shouldn't be a [41:45] problem all right so good night everybody thank you thank you thank you [41:50] good night thank you good night [41:56] bye e