[0:05] Everybody have a chance to take a look [0:06] at the minutes. Move to approve. [0:09] » Second. [0:09] » Motion. Second to approve. Any [0:11] discussion? [0:12] » All those in favor? [0:14] » I [0:14] » Opposed. Motion approved. Approve claims [0:17] in the amount of $3,221,76.17. [0:25] Uh although uh Council Member Marsette [0:27] is not here, I'll uh answer his question [0:29] that I'm sure he has. Uh there are two [0:32] just over $2 million in debt payments uh [0:35] that are set to be wired to the paying [0:37] agent tomorrow. Uh $348,000 [0:40] in milling overlay from the 2627 CIP and [0:44] approximately $100,000 in payments for [0:46] the new exhaust uh in the apparatus bay [0:49] at the fire station. [0:52] Move to approve. [0:54] » Second. [0:54] » Motion second to approve. Any [0:55] discussion? All those in favor? I [0:59] » Opposed. Motion's approved. Discussion [1:01] of possible action on Bear Drive speed [1:03] display sign traffic safety advisory [1:05] committee. Case 38. They got case [1:08] numbers, too. [1:11] » Hello. Aaron Mcy Anderson, city [1:13] engineer. So, at the public uh safety [1:17] committee, uh they approved a speed [1:19] display sign coming into town on Bear [1:22] Drive and so they forward it to finance [1:26] since we don't have dedicated funds for [1:28] our traffic safety um kind of committee [1:31] to distribute. So, we are recommending a [1:35] solar speed display sign in just the one [1:39] direction and we did put up our speed [1:43] radar and the speed limit is 25 miles an [1:46] hour. The 50th percentile speed was 36 [1:49] miles an hour and the 85th percentile [1:52] was 40 miles an hour. So, we did [1:54] identify that there is a speeding issue. [1:57] Um, technically there was speeding in [1:59] both directions, but we figured it [2:01] didn't make sense to put one leaving [2:02] town. And so we are looking for [2:06] approximately $5,000. [2:09] And we there's a few options. Um, I [2:11] asked Sam kind of what maybe our options [2:14] are. And so we could look at the 2026 [2:17] public works budget, but we'd have to [2:19] likely cut something. We can look at the [2:21] 2027 public works budget and add it as a [2:24] line item. We could dip into our current [2:28] CIP which we can find money I guess [2:31] within the bonding for the 2026 2027 [2:34] capital improvement plan or we could do [2:37] the general fund balance. [2:41] » What do you recommend? [2:42] » The recommendation would be if we did [2:43] out of the CIP I would not recommend [2:46] doing that until the end of 27 to make [2:48] sure all the projects come in and tie [2:50] off and see if there's money left over [2:52] if that's the direction that we wanted [2:54] to go. [2:56] I think we need to do this sooner. So, [2:58] what do you think would be the better [3:01] place to take the money? [3:03] » Any of those are options. [3:04] » Yeah, I think the Go ahead, Sam. [3:06] » The when staff is trying to come up with [3:08] a recommendation, [3:10] there isn't a whole lot of of money just [3:12] sitting aside. I think it the um [3:15] recommendation would be to likely cut [3:17] something else. [3:18] Um, and the question then to the [3:20] committee would be what what would you [3:22] guys recommend the reciprocal cut be? [3:25] » Y, [3:27] » Is there anything that's coming in under [3:28] budget right now? [3:31] » No. [3:31] » No, [3:33] » Not that I can think of. It's pretty [3:34] tight. You You guys have the finance [3:37] report now that Sam's been providing. [3:39] Everything's [3:41] very close. [3:44] So if I can Mike, you wanna [3:49] you might answer all my questions. [3:52] » Mike Morz, director of public works. Uh [3:54] so what we could do is for the 2026 [3:57] general operating budget for public [3:59] works this year. There have been several [4:03] accidents that have occurred throughout [4:04] the community that we've basically [4:06] collected those funds back from the [4:09] people that hit this traffic, you know, [4:12] signal, hit a street light, uh, so those [4:15] revenues are coming into the city that [4:17] help offset us buying replacement poles [4:21] or controllers to put back up, so on and [4:23] so forth. So, um, that's one place that [4:26] Sam, maybe you and I can maybe sit down [4:28] and look like what our revenues have [4:30] come back in versus what our expenses [4:32] have gone out and if there because we do [4:34] incorporate some staff time into that [4:36] obviously. Um, and that's already in the [4:39] operating budget. I mean, so I mean [4:41] there are there might be a possibility [4:43] that we could look at that and and pay [4:45] for it out of the operating budget this [4:46] year. So [4:47] » And and and in the end the other [4:49] possibility is finding a time where we [4:52] take these special projects and realize [4:54] we can't do them right now. [4:56] » Well, that's I mean is it an enforcement [4:59] issue again where we just is it is that [5:02] section of road in the city or in the [5:04] county jurisdiction? [5:06] » It's in the city and I know um Chief [5:09] Williams [5:10] » He said they put you know they go out [5:12] there once in a while. He specifically [5:14] said, I think this was when they had [5:15] like four officers out there and sure [5:17] » They do that, you know, and there was [5:20] maybe four people pulled over at the [5:21] same time because there was like so many [5:23] people going over the speed limit. So [5:25] they do the best that they can with [5:29] their resources. [5:31] » Well, that that's what I was going to uh [5:32] start with. So I looked at the map and [5:34] this is this is literally right on the [5:36] border of of uh coming, you know, [5:38] welcome to the city. Um, prior to that [5:42] 25, it's 45, right? [5:44] » Yeah. I don't [5:45] » No, it's 35. [5:46] » It goes from 45 to 35 to 25. [5:49] » So, you know, and basically like you [5:52] mentioned, if they're leaving and going [5:53] fast, we kind of say, who cares? We [5:55] don't really say that, but we we mutter [5:57] that, [5:58] » But so then let's flip that concept [6:00] around. So they're they're they're [6:01] coming in from the town going 45 55 and [6:05] now you know we have to reach in the [6:08] wallet or try to find this money for [6:10] this thing. I'm not against it. I think [6:11] those things have proven to so the the [6:13] the uh traffic but this is not a [6:16] guarantee that now we won't have any [6:18] speeders. Um I appreciate you putting [6:21] the picture in there and it's not a you [6:22] know truly a residential neighborhood. [6:25] My fear is that as soon as we have a [6:26] couple people say, "Hey, I think there's [6:28] speeders coming through here." Um, we're [6:31] then now kind of, well, we'll jam one of [6:33] these signs in there and, you know, in [6:35] every sign. So, I'm not against it and I [6:37] and I don't want to I wasn't part of the [6:40] the uh safety uh public safety, but um [6:46] it's a it sounds like a not a bad idea, [6:49] but we're also saying, "Well, where's [6:50] the money?" I mean, it's if we did this [6:52] like our own checkbook, we'd say, "Boy, [6:54] we'd love to do that maybe next year. We [6:56] just can't afford it right now." I don't [6:58] that that's kind of what hits me about [7:00] this. Um, [7:01] » Yeah. And another thing, we do have bare [7:04] drive in the CI the six-year CIP. I [7:06] don't remember exactly what year we put [7:08] it for. So hopefully if we redo it, we [7:12] can maybe look to change some things to [7:14] help with speeding, but [7:16] um or include the sign with that [7:18] project, you know, kind of wrap it in [7:20] with that project. So that could be an [7:22] option, too. But if we were able to put [7:25] in the sign now and then you were able [7:28] to design it better when it's um redone, [7:35] » We could move that sign. And so I mean [7:38] the money isn't wasted by buying a sign [7:40] that [7:41] » True [7:41] » Because I mean we got plenty of speeding [7:43] spots in all over the c the city. Um [7:48] » But to your point you said and again I I [7:50] I trust that a lot of work has been done [7:53] this. Um the safety committee said we [7:56] need that and you guys said sooner than [7:57] later. Then then where are we going to I [8:01] mean I know that you guys were just [8:02] talking about that but I I don't have an [8:04] answer. I don't have 5,000 on me right [8:06] now. to pay for it. Are we do you feel [8:09] comfortable with with um underruns from [8:12] projects that are currently in house or [8:15] » Yeah, I mean we did have a good year, [8:17] you know, with under bidding, but then [8:19] we're kind of pushing the limit for [8:20] wanting to add, you know, B&M Farms next [8:23] year basically with that overrun of [8:25] fund. [8:25] » That's true. Yeah. Mhm. [8:27] » So, [8:28] » Usually we put enough contingency where [8:31] I personally would like to see at least [8:33] $5,000 left at the end of all the [8:35] projects, you know, instead of going [8:37] over budget, but [8:40] that doesn't mean it who knows what the [8:41] bidding will look like next, [8:42] » Right? [8:44] » The insurance reimbursement is not an [8:45] option. [8:46] » Oh, we can't use that [8:50] insurance collect to offset our [8:52] expenses. Mhm. Okay. [8:59] Okay. [9:02] » Well, I guess we don't have the money. [9:03] We don't have the money. [9:06] » Well, if we were to make a motion, [9:09] I don't know what the Yeah, I don't know [9:10] what the answer would be. Um, is this [9:13] something that we [9:15] » Yeah. [9:16] » 2027 priority list? [9:19] » Sam, what do you have? What What would [9:21] you recommend? Anything? [9:24] My recommendation would be that [9:28] if it were passed that we would likely [9:30] need to see a cut somewhere. Um [9:34] or unless it is a recommendation to put [9:37] it in 2027's budget, in which case we [9:41] can we'll be able to fit it in and bring [9:43] it back to the council with another cut [9:46] from staff. [9:51] » Another cut from staff. Well, a staff [9:53] recommendation as to where to cut that [9:55] in the 27 budget. [9:56] » Not a staff cut. [9:56] » Okay, I apologize. I did not mean that [9:58] as a cut to staff either. That [10:00] » Sounded pretty ominous. [10:01] » Yeah, sorry. I did not mean it like [10:02] that. A recommendation from staff as to [10:05] where to cut it from the 27 budget. [10:07] » Do we have an accident report for there? [10:09] » Uh, let's see. What did I [10:14] » There in the last three years, there has [10:17] been one accident related to wildlife [10:20] crossing. I don't think it said deer, [10:22] but [10:25] » And the sign would not work on on the [10:27] deer, [10:28] » Right? Pay attention to that. [10:31] » No, but you know, [10:32] » Nobody else does. Why should they? [10:33] » Right. [10:33] » They got the deer crossing signs. They [10:35] know where to go. [10:36] » I know. They just don't read them. [10:38] » Um and and again, just trying to be [10:40] creative here. What if I mean, could we [10:43] approach the town and say, "Can you back [10:44] up your or back down your speed limit to [10:47] 25?" because I think the speed probably [10:50] takes place in that first 100 yards [10:54] of you hit that sign, you see 25 and [10:56] it's still you still have that [10:57] straightaway there. [10:59] » Um [11:00] » I don't know. I'd have to ask Jeff maybe [11:02] about that, but I don't know where they [11:04] sit exactly. Yeah. But [11:07] » I'm going to make the motion that we um [11:11] send this back to staff to make a [11:14] recommendation on where we can find the [11:17] money if possible. and discuss it at our [11:20] next finance meeting. [11:23] » Yeah, I'll second that [11:25] » Motion and second. [11:27] Any further discussion? [11:30] I'm just I'm just wondering if [11:34] don't get me wrong because you know how [11:36] I feel about speeding and people not [11:38] obeying traffic signs and things here in [11:41] the city, but [11:43] one accident in three years and it's [11:45] just a deer. [11:48] Don't want to minimize what what [11:50] happened to that deer, but [11:53] » But did you read the urgency here? I I [11:56] really don't see the urgency. [11:57] » Did you read the summary of the con [11:59] concern? Um I have photos on my phone of [12:01] cars passing in the double yellow 25 [12:04] mile per hour multiple times in the last [12:06] year. So people are they're ignoring the [12:09] double yellow. They're they're speeding. [12:12] And this is this is a a big problem that [12:15] I mean we're we're lucky that we haven't [12:17] had any accidents. I'm surprised that we [12:19] haven't had any. I drive that that [12:22] section uh quite a bit because I go up [12:25] to Somerset to visit my daughter and [12:27] come back that way and um [12:30] I don't there's usually not a lot of [12:31] traffic there, [12:33] » But um [12:35] » Well [12:36] » I can see where people are would be [12:37] speeding. Do people typically reduce [12:39] speed when they see a sign like that or [12:41] is there I mean some people might test [12:44] their speedometer to make sure it works. [12:46] » I I'm just wondering if the [12:48] effectiveness of those signs and if [12:49] there's any data on the effect [12:51] » There has been some data on this the and [12:53] I I think I mean Jeff can correct me but [12:56] I think like stage line where we added [12:58] them it has helped quite a bit. It [13:01] sounds like uh we did that in both [13:04] directions on Stageeline Road which had [13:06] you know maybe a similar I mean that's a [13:09] higher um speed limit but [13:12] so there is some effectiveness shown at [13:15] least temporarily you know when you [13:18] cross it. [13:20] » Mhm. And I'm I'm again I'm not opposed [13:23] to these tools um that you know are [13:27] there for safety but also you know [13:29] slowing people down. Um again it's not [13:32] in a residence but I there's nobody I [13:34] talked to in the city that one of their [13:36] top complaints not that they have a lot [13:38] but one of the top ones is they're [13:39] speeding in my neighborhood [13:40] » And that could be a small residential [13:42] neighborhood it could be Carmichael. It [13:44] could be this area. So my again my fear [13:47] is the idea that let's spend five grand, [13:49] find it from somewhere, put a sign in [13:51] there and say there we're done. We fixed [13:53] the speeding issue. [13:55] » People are still going to cross the [13:56] yellow line. [13:57] » Um it is it is a straightaway. I've I've [14:01] » I've I've been on there and it it is it [14:03] does feel unnatural to go 25 down there [14:06] to be honest with you. Um, [14:09] and if we did have, you know, this [14:12] here's this checkbook that's meant for [14:13] these safety things and we had a decent [14:16] balance in, I would be right alongside [14:18] you. I just I don't want to I I liked [14:20] your motion because um rather than just [14:23] blindly say, "Let's write the check and [14:25] we'll figure out how to cash it later." [14:27] I'd like to know where it's coming from [14:28] before we approve anything. So, [14:32] » All right. [14:34] » All those in favor? I I [14:35] » Opposed. Motion's approved. [14:39] » Discussion possible. Thanks, Aaron. [14:41] Discussion possible action to approve [14:42] the quote from Jar Roofing Service for [14:44] repairs at 21101 O'Neal Road. [14:48] All right. Mike Morz, director of public [14:50] works. Again, uh we have an issue with [14:54] the roof at the new public works [14:56] facility. Uh unfortunately, it is on the [14:59] side that we lease to uh Progressive [15:02] Rail. Uh this leak has been an issue um [15:06] for the last couple of years. Um we [15:10] tried to chase it and brought in Jar to [15:13] do some sealing of roof penetrations [15:16] around rooftop units. Uh they did some [15:19] sealing around some of the trim on the [15:21] the roof edge and continued to have [15:24] problems uh on that side with leaks. And [15:27] so Caterpillar or Progressive Royal [15:28] reached out to me and say, "Hey, what [15:29] are you guys doing to fix this?" Right. [15:31] Um, so Jar came back, did some [15:34] investigative work. Uh, Jar is a company [15:36] that we've worked with in the past to do [15:38] emergency repairs on some of our other [15:40] roofs at the library or our public [15:42] workshop up on the north side of town. [15:44] And they took took some core sample and [15:46] found some wet insulation, um, which is [15:48] apparently bad on a flat roof. Um, and [15:51] so they basically put a quote together. [15:54] Uh the total is $17,767 [15:57] to replace that uh section of roof that [16:00] has become damaged. Um and like I said, [16:04] that should hopefully uh stop the leak. [16:08] Um where we're going to pay this from, [16:11] talk to Sam. Uh we would use the the [16:14] rental income that we acrew from them [16:16] every every month to help offset this [16:18] expense. and they pay us um [16:21] approximately $25,000 in rent every [16:23] month. [16:25] » What is that money designated for [16:26] though? Isn't it Isn't it already [16:28] designated? [16:29] » That Go ahead, Sam. [16:30] » Yes. So, we get uh as Mike said about [16:33] $25,000 a month or about $300,000 a year [16:36] from them. Uh that money is in the debt [16:38] service fund to pay uh the 2024 uh non [16:42] or NAN uh debt issuance, which is a [16:45] balloon payment at which we pay interest [16:47] only on that. that interest payment is [16:50] approximately $210,000. [16:52] » Okay. [16:52] » For next year. So that leaves us with 87 [16:55] $87,000 [16:58] um approximately that uh could be used [17:00] for this. [17:01] » Okay. I'll make the motion to approve. [17:04] » I'll second. [17:05] » Motion second to approve. Any further [17:07] discussion? [17:09] All those in favor? [17:10] » I [17:11] » Opposed. Motion's approved. Thanks, [17:13] Mike. Ordinance 07-26 amending the [17:17] three-hour parking limit and eight hour [17:19] parking limit. [17:23] » Bren, do you want to take this or do you [17:24] want me to? [17:26] » I'm sorry. I was busy letting council [17:27] member Sarah in. I missed what we're the [17:30] point that we're on. [17:31] » We're on the last item on the parking [17:33] three hour and 8 hour parking. [17:35] » Uh, okay. [17:37] » Yes. So, so this is um uh the the [17:40] request was on last meeting's agenda [17:43] came from the parking utility to allow [17:46] for a section of three-hour parking near [17:49] the it's just across the street from the [17:51] boat launch um on the let's see that [17:54] would be the east side of first right [17:56] behind the river city center and this [17:59] would allow for 25 total spaces to go [18:02] from a three-hour parking limit to an 8 [18:04] hour parking limit. So it take eight [18:06] spaces that would cycle through every [18:08] three hours and convert it to an eight [18:10] hour in which permit people would be [18:12] able to use and also hourly people would [18:15] be able to use but it would be an 8 hour [18:17] maximum parking limit. [18:20] Think that's it. [18:22] » So how many employees are they planning [18:25] expecting to have in that building? [18:28] » I think they're already there. [18:30] » They are already there. [18:31] » Yep. [18:32] » Yeah. I I don't know the numbers of [18:34] employees or anything to that. It was [18:36] just the request for [18:37] » I was told that there are up to 60 [18:38] employees but most of them are working [18:40] remotely. [18:42] I don't know how accurate that is, but [18:44] » So, how many [18:49] So, the reason that they want 8 hour [18:51] parking in that area is so that even [18:54] those who would not buy a monthly permit [18:58] would be able to park there for their [19:02] full day of work. [19:05] Um, I mean, do they need all 25 spaces? [19:09] I [19:14] I I don't know the answer to that. Did [19:16] you Did I I I wanted to clarify [19:18] something. I I thought I heard you say [19:20] that they were going to take eight [19:22] stalls. [19:23] » Eight stalls. [19:24] » No. Uh it's the 25. [19:26] » Okay. Yeah, [19:27] » It's all 25. [19:28] » Heard that. [19:29] » So, um [19:32] » To go to eight. I don't know that they I [19:35] they're not I don't I don't think it [19:38] would be accurate to say that they're [19:39] going to take all 25, but at the same [19:40] time, it's not accurate to say they [19:42] wouldn't. Depends upon who's there. You [19:45] know, [19:46] they they have staff meetings every now [19:48] and then, bring them all in. [19:50] » Okay. Because I noticed that there are [19:52] some spaces on that side of the building [19:56] » In their parking lot. So I went down [19:59] there this this afternoon to look at [20:02] everything and and most of those spaces [20:05] were empty. So I don't you know All [20:08] right. So what is the impact [20:11] on the for are those spaces used a lot? [20:16] Has there been any [20:18] information gathered on how how much [20:22] usage those spots get during the day? I [20:25] mean it's it's only going to be during [20:26] the day that they're going to be using [20:27] them. Correct. [20:28] » I I think they're used quite a bit [20:30] during the summer. [20:31] » Oh. [20:32] » Uh during the boating season [20:34] » As guests that are going out with people [20:37] » Uh that are launching with people at the [20:39] at the boat launch. [20:40] » Okay. So [20:41] » They're going to get there early in the [20:42] morning maybe. Yeah. But they're they're [20:44] used quite a bit during during the [20:46] summertime. I'm not sure. [20:47] » Before Sar went in there. [20:48] » What's that? [20:49] » That's before Saranda went in there. [20:50] » Yes. [20:51] » That's also weekend parking. I I too, [20:54] you know, I know that little area and it [20:56] it is probably our least popular parking [20:58] spot, you know, as far it's probably the [21:01] furthest from any restaurant or bar or [21:03] store. Um, [21:06] and I do like the way that this is set [21:08] up. It's a creative way to like [21:09] especially if we raise our per our [21:12] permit prices. We're guaranteeing what [21:15] 25,000 excuse me $2500 [21:18] for the employees. But still if if if [21:21] they're not being used, someone could [21:23] park there for one hour or four hours or [21:25] whatever. So we could almost we could [21:27] almost double dip, if you will, [21:28] » If the employees buy a pass or a permit [21:32] » And then someone wants to park there and [21:34] go to the the beach or whatever or [21:36] whatever they want to do. um [21:40] it would be a way to to like gu like I [21:43] said guarantee that payment but it's [21:44] also it's not reserve parking for them [21:47] and um I do see the church down there on [21:50] the weekends they people use that but [21:52] this wouldn't be this is a Monday [21:54] through Friday thing for the permit [21:56] right [21:57] » Yeah well this should be used I would [22:00] expect that a a business like Saranda [22:02] would only be using it Monday through [22:03] Friday regular business [22:04] » Hours if the employee or somebody does [22:07] have [22:08] a pass that's year round that they can [22:10] they can park there on a Saturday if [22:12] they wish to. [22:12] » Sure. [22:15] » Are there any concerns about this? [22:17] » So, here's here's my concern. This is [22:19] why originally I wanted to postpone this [22:22] to look at the uh agreement that we had, [22:26] development agreement there, and that's [22:29] » It's kind of vague in relative to what [22:33] my concern was. So, it's a horse piece [22:36] really. Um, and that having to do with [22:39] the 5% tradeoff in consideration for the [22:42] uh the developer getting 5% additional [22:45] on tiff revenue uh increment as a [22:49] trade-off for the 25 parking spots. [22:51] Okay. And then all of a sudden the 25 [22:53] parking spots ended up end up being [22:54] perhaps going exclusive not exclusively [22:57] but a big chunk of them to a tenant [23:02] of the developer. So that was my [23:04] original concern. The language is vague, [23:06] so I'm not going to argue that point. [23:09] Uh, but [23:12] I think that I think the bigger issue [23:14] for me right now, and I'm not I'm not [23:17] wedded to this one way or another. I see [23:19] both sides. But I think a bigger concern [23:22] right now, we're going through a lot of [23:24] discussion about parking. And we're [23:26] going to have more coming up here very [23:28] soon. [23:30] And what if any business were to do [23:33] this? [23:34] I mean, if I saw council passing this [23:37] and I had employees down here, I [23:40] employed a lot of people. I'd say, [23:41] "Yeah, I want in on that." [23:44] » Mhm. [23:44] » Uh, you know, if we have public parking, [23:47] which is what this is, it's city-owned [23:49] public parking. What about other public [23:51] parking spaces? What about over here? [23:53] you know, turn that into 18 permit [23:55] parking for or eight hour rather permit [23:57] parking for anybody that wants to come [23:59] in because they've got a business that [24:01] they might relocate or they move [24:02] downtown or they've been downtown, they [24:05] need additional parking or [24:08] they're expanding and they want [24:10] additional parking. So, I'm worried [24:12] about the precedent that we're setting. [24:14] And [24:16] so, that's my biggest concern. [24:18] » So, we excuse me. You know, here here's [24:21] something you're going to hear me say [24:22] probably a lot in the next few weeks for [24:27] sure. [24:29] We we didn't used to have a parking [24:32] problem downtown, right? Which is why we [24:34] developed a system where we had payment [24:37] in lie of we wanted to encourage people [24:39] to come downtown. We wanted to encourage [24:40] businesses to come downtown. We didn't [24:43] have very many restaurants downtown. We [24:45] just had a handful and uh so parking was [24:49] not an issue. All of a sudden, Hudson [24:51] became very popular place to be. We got [24:53] a lot more restaurants downtown. Every [24:55] single one of them got a parking or a [24:58] payment in lie of deal. We got no [25:02] additional parking and then of course we [25:03] were inundated with complaints about [25:04] parking downtown for years. Okay, that [25:09] was resolved in my opinion when uh Mike [25:13] and and their crew uh came in with a [25:16] recommendation to change the system [25:19] » To enforce until 8:00 to go with the [25:22] threeh hour to the enforcement until 8 [25:24] with three-hour which encouraged [25:27] promoted um turnover churn downtown [25:30] which was huge the additional 300 [25:32] parking spaces that were then metered [25:34] and we haven't had a single complaint. I [25:36] haven't personally had a single [25:37] complaint about parking downtown other [25:39] than people that are getting tickets [25:40] that don't think they should uh or don't [25:42] want to pay them, but we're going to [25:45] start seeing parking complaints downtown [25:47] again here pretty soon. [25:48] » Mhm. [25:49] » And and that concerns me because we've [25:52] got nowhere to go and we don't have any [25:53] money to do anything about it. You know, [25:55] we've got when we tore down the fire [25:59] station over here and created the [26:01] additional parking spaces, we were [26:03] thinking in the back of our minds, we [26:05] didn't want to put a a ramp up there. I [26:07] don't think anybody was in favor of a [26:08] ramp downtown here, but we were talking [26:11] talking about putting a deck over that [26:13] potentially if we needed additional [26:15] space. We may need that and it's still [26:17] an option, but we don't have any money [26:19] for that. [26:21] So [26:23] those are three-hour spots right now, [26:25] correct? [26:26] » Three or four? Yeah. [26:27] » Three. Three. Three. Three. Okay. [26:29] » And so if an employee [26:32] » When you say those, you're talking about [26:33] the 25 [26:34] » The 25 spots. Yeah. [26:35] » Yes. Yeah. Yeah. [26:36] » So, [26:39] all right. So, and you said that they've [26:40] already moved in there. So, an employee, [26:43] they should be able to park in those [26:45] spots that [26:47] are in the parking lot that if they need [26:49] to be there for for eight hours because [26:53] those spots are available, they can park [26:55] on the other side of the building also. [26:57] I mean, it's the parking is in that [27:00] parking lot is for the tenants of that [27:02] building and the customers of that [27:04] building. [27:06] So I I guess my question is what are the [27:10] um the options that somebody an employee [27:13] has right now without these 25 spots [27:17] available for permit parking. [27:20] » Well, [27:22] they can go on the street. I mean, [27:23] pretty much any option they've got is [27:25] like three-hour parking somewhere uh [27:27] » Or four hours up in the uh the lot. [27:30] Yeah. [27:30] » Yeah. [27:31] » Well, or they could also purchase a work [27:33] permit, right? And we have we already [27:36] have areas designated [27:38] » Or [27:40] » Right. So to me this is I mean I know a [27:42] particular [27:44] » Uh Saranda I know that it sounds like [27:46] they started this request but again it's [27:49] not reserved for just them. Does this [27:52] benefit I mean I like having businesses [27:56] you know um because they were up by [27:59] Wells Fargo, weren't they? [28:02] » Yeah they were on the other side of [28:03] Vine. [28:03] » Yeah. [28:04] » Yeah. [28:05] So, they stayed here and maybe again [28:07] they started the request, but it's [28:09] they're not saying make this a private [28:11] area. That's just basically does it make [28:13] sense to expand as we have more people [28:16] working downtown. This is probably not a [28:18] crazy request to be made. [28:21] And again, I think they're basically [28:23] saying, can we can we buy permits? And [28:26] it's next to their front door, right? [28:28] But if I want to go down there and park [28:30] on a Tuesday at 10 in the morning, I I'm [28:33] not really taking one of their spots. [28:34] I'm now we're just down we're having the [28:38] benefit of of um being able to get those [28:40] permits. So um [28:43] » But during the summer if if you wanted [28:45] to park there and and um go out on your [28:49] boat, then you could park for a full [28:51] eight hours and go on your boat [28:54] » And that could tie up spots that are [28:57] needed. So, I I'm uncomfortable with [29:00] this. [29:02] » So, like I said, I'm not wetted one way [29:04] or another. I just wanted to bring that [29:06] up as an issue when you asked what what [29:08] what might be the concerns. [29:11] » That to me is the biggest concern. To [29:13] your point, Mike, you know, I originally [29:16] the first pass on this, I thought it was [29:18] I didn't realize it was going to be [29:21] open to everybody, anybody, you know, [29:23] first come, first serve. [29:25] And uh there are some other [29:27] considerations. I get it. I you know, [29:28] and Saranda is a great employer. They've [29:30] been good to the city and uh and and we [29:33] we want them here in the city. There's [29:35] no doubt about it. Um I just uh [29:41] I don't know. I don't know. I'm very [29:44] very concerned for the future down here [29:46] with parking. Well, they can buy a [29:47] permit for over here and walk to Saranda [29:51] from there if they really wanted a [29:54] wanted permit parking. [29:55] » Well, one of the things that we do need [29:58] to do is probably another parking study. [30:01] Um the parking committee does have some [30:04] funds that we could put toward another [30:05] parking study for all of downtown. [30:08] Um they just you know I think their pool [30:11] they have I want to say it's almost 400 [30:14] in that pool. Parking study might [30:17] disappear. I'm guessing a parking study [30:19] is going to be probably 30 or 40 for a [30:23] decent parking study of our current [30:24] conditions. [30:26] » So it's something to think about as [30:27] well. It's something that we probably [30:28] should start to plan for and it would [30:30] come out of those funds for the parking [30:32] committee. [30:33] » When did we put in this system? [30:35] » 2019. [30:37] Okay. [30:38] » Yeah. Right. Right before CO is when I [30:40] » So, it's been almost 10 years. I mean, [30:42] it's been seven. [30:44] » Seven. [30:44] » So, so it's been 10 years since the last [30:46] at least 10 years since the last parking [30:48] study. [30:49] » Well, and it seems like you've changed [30:50] quite a bit downtown. [30:51] » Yes, there's there's been a lot of [30:52] changes in the 10 years. Yeah, I think [30:54] that [30:55] » Now we have [30:55] » I think that's a good idea to start [30:57] thinking about. [30:58] » Max socials coming in. [31:02] » Yeah, Max's social. That's going to take [31:04] parking and then [31:05] » Potentially [31:05] » The visitors to the apartment complex [31:07] that's going in. We've got a lot of [31:09] there's going to be a lot of pressure on [31:11] the parking [31:12] » Plus the redesign of the park, right? [31:14] Adding all the [31:15] » What I I think I I like the idea of a [31:18] parking study and and I also want to [31:19] couple that with the whole payment in [31:22] lie of [31:22] » Yes. [31:23] » Yes. [31:24] » We we need to address that. [31:26] » Yes. [31:26] » That I don't think that that is I don't [31:29] think it works for us anymore. Like I [31:32] said, it was great at first for an [31:33] incentive to to bring businesses [31:35] downtown. Uh I I just don't think it's [31:38] working for us anymore. And I'd like to [31:40] know, frankly, how much money we've [31:42] collected over the years for payment in [31:44] lie of [31:45] » And where it is. [31:48] » Is everybody up to date on paying us? [31:50] It's supposed to they can take up to [31:51] what 8 to 10 years to pay it. [31:53] » Which one? 8 10 [31:55] » Uh depending upon the amount. [31:56] » Uh it it it changes up to eight years if [31:59] it's uh over 7500. [32:01] » So it's a onetime payment. [32:03] » It could be but they [32:04] » One time payment they have it they can [32:06] pay it over a period of eight eight [32:08] years but it's one time. [32:10] » Okay. [32:10] » Um so it's not it's just Yeah. [32:12] » It's one amount I should say paid over a [32:14] period of eight years. [32:15] » No I think that's a that's a policy that [32:17] we should be revisiting. [32:18] » Absolutely. So maybe a study to look at [32:20] that, look at our ordinance as it sits, [32:22] and then make recommendations back. [32:25] » I'm going to make the motion that we um [32:28] wait to make a decision on something [32:30] like this until we've discussed the [32:32] payment in L and we also um discuss a [32:36] parking study. [32:39] » I don't I don't want to Well, [32:41] » There what do you go toward a moratorum? [32:45] » No, because it's not zoning. [32:47] » Because it's what? This isn't zoning [32:49] related. [32:50] » Parking the ordinance is part of zoning. [32:53] » Well, but a moratorum on on what [32:56] exactly? [33:00] » Yeah, there's some decisions to make, [33:01] but Okay. [33:03] » I'm I'm going to throw out before we get [33:06] » Too far down there. Um I know we talked [33:08] about in the summer and boating and and [33:10] what and people coming down here. We're [33:12] also getting to our point in the season [33:14] where it's going to be a lot quieter [33:16] down there. Um, whenever it's under 50 [33:18] degrees, there's not a lot of people [33:20] strolling along the uh park. Um, [33:23] and also across the street, Mike's going [33:25] to love when I say this, but you know, [33:27] we do have that boat launch that gets [33:29] very little traffic in the winter. There [33:30] might be a boat or two the in January if [33:33] if the thaws, but that's a lot of real [33:36] estate that's just sitting there that [33:38] could maybe be a seasonal permittable [33:41] part, you know, a work permit spot. Um, [33:45] again, it it would bring in I know we'd [33:47] have to maintain a little bit more. Um, [33:50] but [33:52] again, I'm just I'm thinking that we're [33:54] all thinking Saturday, Fourth of July, [33:57] you can't find a parking spot in town. [33:59] But for the next 6 months, I think those [34:01] 25 spots are going to be empty and the [34:04] and the boat launch is going to be [34:05] empty. So [34:07] again, to throw it out there, if if we [34:09] could look at this as a six-month [34:12] um [34:13] » What are the restrictions on the boat [34:15] boat ramp parking lot for the during the [34:18] winter? [34:22] » I say during the summer, I know during [34:24] the winter there really are none. Um so [34:26] from May 1st to September 30th we have [34:30] stipulated that only boat or u vehicle [34:33] and trailer can park in the lot. Outside [34:36] of that there's really nothing in the [34:37] ordinances that dictate anything. [34:40] » So it's [34:41] » Yeah right now we don't we don't plow it [34:42] in the winter time. We do we do run a [34:44] truck through it just to make a pass. A [34:46] lot of the guys use to use the rest of [34:48] them at Buckeye Garage but that's no [34:49] longer there. So, it'd be one of those [34:51] things where we would have to add some [34:52] type of maintenance in the winter time, [34:54] but really no restrictions right now. [34:55] » Yeah. So, and we don't [34:58] pile snow there anymore. [35:00] » We don't pile snow there anymore. Nope. [35:03] » And the docks don't come out. [35:05] » Don't come out. Stay. [35:08] » Okay. [35:11] » So, [35:15] you said through September 30th. So, [35:18] starting in another week, they they [35:20] could park there as long as there isn't [35:22] any snow there. [35:25] And there's is there's no um fees for [35:28] parking in there during that time [35:30] period. [35:30] » Park there if there's snow. [35:33] » Okay. [35:34] » Well, I think we could add it to our [35:36] zone. [35:38] So, we could collect the dollar an hour [35:41] or 50 cent an hour, whatever we do. [35:45] Again, I don't I know I kind of hijacked [35:47] this topic and kind of moving it to [35:48] that. So, I wanna [35:49] » Well, nobody seconded my motion, so um [35:53] we're [35:54] » Well, yeah, it sounds like we're not we [35:56] don't have this thing wrapped up with a [35:57] bulbe. Um so, then [36:00] » But is the is the is your motion that we [36:04] do a study and this is a prolonged [36:06] » I I just saw this thing lasting [36:08] » Back to the parking commission, right? [36:11] Well, [36:11] » I don't know who control I mean the end [36:14] control comes here for that those funds. [36:18] » I'm looking at [36:19] » Well, I mean what's what's interesting [36:20] about this one is that [36:23] » They recommend to this committee. [36:25] » Well, but but sir Saranda is in a [36:28] building that has a large parking lot. [36:30] » Yes. [36:30] » Right. And and so you know ordinarily [36:33] you would [36:34] » You would think that the direction would [36:38] be park your vehicles in your parking [36:40] lot and you know I think the the request [36:43] is based largely on the parking lot is [36:46] on the opposite side of the building and [36:48] they're looking for some space on the [36:51] I'm not going to say the rear side of [36:52] the building the other front of the [36:53] building. Um [36:55] » River side's good. the Riverside and and [36:57] so, you know, understand that there are [36:59] lots of issues and and as the mayor [37:01] mentioned, we are dealing with a lot a [37:04] lot of issues right now currently and a [37:05] lot that are that are coming down the [37:07] road. But, you know, do you want to deal [37:10] with this one first in which they have a [37:13] specific request related to having some [37:17] parking access on the river side of the [37:19] building or do you want to wait and go [37:21] through the parking study process before [37:23] you act on this particular request? You [37:26] have a request in front of you. The [37:28] question really is what do you what do [37:29] you want to do with it and how do you [37:32] want to proceed before you make a [37:34] decision or do you need to do anything [37:35] more before you make a decision on this [37:37] particular request? How long does the [37:38] parking study take, [37:41] » Mike? Do you remember how long? [37:43] » Probably gonna take minimum four months [37:46] if it's hurried [37:47] » At least. [37:47] » Yeah, if it's hurried. But six months [37:50] probably. [37:50] » Well, and of course they're not they're [37:52] not would we need to capture summer [37:54] numbers and everything too? Would we [37:56] have to go through a [37:57] » Yeah. [37:58] » Yeah. [38:00] » It would be it'd be more expedited this [38:02] time because we have all that data now [38:05] with our new system, right? [38:06] » Oh, true. the previous the previous [38:08] system we were looking at okay let's [38:11] look at inventory let's look at churn [38:13] let's look at [38:14] » You know what is the bar you know best [38:16] possible options for you know paid [38:18] parking moving forward and this is what [38:21] the city arrived at is our current [38:23] scenario [38:24] » Which has worked really really well we [38:26] have created turnover [38:28] um you know we don't have long-term [38:30] parkers and spots that should be for [38:32] patrons of different establishments or [38:34] customers um So we would have a lot of [38:39] the data. Oh, and the old study in 2017 [38:41] also included [38:43] um looking at, you know, parking [38:46] structures, things like that. You know, [38:47] what would our options be? What would [38:49] that look like from a cost standpoint? [38:51] You know, tens of millions of dollars, [38:53] you know, what is your long-term [38:54] maintenance on those facilities look [38:55] like, which is a lot. Um, so this one, I [39:00] think, be done quite a bit quicker, but [39:02] you'd have the RFP process to begin [39:04] with, right? So you'd have to go through [39:06] that. The I'm assuming the the [39:09] commission would then forward on a [39:11] recommendation for a preferred vendor [39:12] with a cost estimate and then I would [39:16] say [39:18] from there [39:18] » So that's going to take several months [39:19] just right there. [39:20] » Yes. [39:22] Um, I would really like to see more [39:25] information from Saranda on how many [39:27] people are [39:30] are in their offices [39:33] each week or you know each day so that [39:36] we know what the real need is because I [39:39] mean we don't have any data from them on [39:42] what they what they really need [39:47] and is this just because they want the [39:49] convenience of parking on the same side [39:52] of the building as their door or [39:56] um is is are the is the parking lot on [39:59] the other side of the building full all [40:01] the time? [40:03] » So, I'd like to I'd like to get more [40:05] information from Saranda. [40:06] » River City C Center's parking when that [40:08] project was approved is maxed out, [40:10] right? So they're required to provide a [40:12] certain number of parking spots for the [40:15] redevelopment of that project back 2018 [40:18] certain 201819 [40:20] » Right [40:21] » So they don't have any extra spaces to [40:23] spare now the Saranda space or proposed [40:26] Saranda space or the space of the [40:28] already [40:28] » Is part of that calculation right okay [40:32] » So um this is in addition to that [40:37] um the one and I don't know if it's been [40:39] you know stated yet. But you know the [40:41] one thing and the question is is you [40:44] know how far are people willing to you [40:46] know walk or you know travel to get to [40:49] their place of business. We don't have a [40:52] permit parking lot in the south end of [40:54] town. [40:55] » That's true. [40:56] » Right in the very south south side. So [40:58] the closest option they would have would [41:00] be likely Williams. [41:03] So, [41:05] » I' I'd like to see them make the case [41:07] for us that they really have a need for [41:09] this for these park the parking. I mean, [41:12] they made the request, but they I don't [41:14] think that they've sold the concept to [41:16] us. [41:18] So, [41:20] um I think that would be a minimum next [41:23] step [41:25] is to get data on what their real needs [41:28] are. [41:32] Go on, just to be devil's advocate, what [41:35] who's then going to look at all the [41:36] charts and numbers and say, "Ah, now [41:38] they do need it or now they don't." I [41:40] mean, [41:41] » They're obviously going to say, "We we'd [41:42] like that for our employees, right?" [41:44] » And the city's going to say, "Well, I [41:45] don't know if we want to spare that [41:46] eight hour." So, [41:48] » I don't disagree. We're kind of working [41:50] blind, but again, they made the request, [41:52] » But it's basically the city to make that [41:54] available for eight hours regardless of [41:57] who made the request. It's because [41:59] again, anyone can park there even during [42:01] business hours. [42:02] » Uh it's not private. So, um I'm okay [42:06] with, you know, if we're waiting for [42:08] more information, but um I don't know if [42:10] that's going to shine a light on on a on [42:12] the answer yes or no on this. [42:15] » So, does does [42:18] I I'm hearing all this and I I I'm not [42:20] disagreeing with anything I've heard. Um [42:25] does uh coming into this part of the [42:26] season, boating is pretty much done. Uh [42:30] things slow down down there. Is it does [42:33] the ordinance allow us to do a prora [42:35] six-mon thing until allow for the [42:38] parking there, permit parking until the [42:40] boat launch opens again? [42:42] » Could I mean I think he's looking now, [42:44] but you could probably assign a just a [42:46] six months to it. [42:48] » That's kind of [42:49] » With this. Yeah. With an end date. [42:51] » Yeah. [42:53] allow us to complete a study, too. [42:55] » Yeah. And I want [42:56] » That's what I'm thinking. It gives us [42:57] room then to to get a study in. Uh [43:02] » Is any thought on that, Mike? [43:03] » No, I I just want to say I remember [43:05] Brent, correct me if I'm wrong. I want [43:06] to say at the parking commission two [43:09] meetings ago, they said it was 30ish [43:12] permits that they would be coming in for [43:17] and they would not all be utilized. [43:20] They're they're going to request 30 [43:22] permits for 25 spots, [43:25] » Right? Well, we we allow we applications [43:28] for [43:28] » I didn't know how many per I didn't know [43:30] how that worked. How many uh [43:31] » Yeah, they're not like filling them all [43:33] at one time. [43:33] » So, we over book [43:34] » If they have 30 employees that may or [43:36] not [43:37] » Well, they can park anywhere. [43:38] » Yeah. [43:41] So, I'm I would like to postpone this [43:45] discussion till our next meeting and see [43:47] if we can get some more data on what [43:49] their needs really are and how many [43:51] employees they've got on a typical day. [43:54] That's working in that [43:57] um building and how many parking spots [44:01] are available in the parking lot on that [44:04] side of the building for those [44:05] employees. [44:12] Is that a motion sort of? [44:14] » I'll make that a motion. Can [44:18] » With what the mayor said, is that [44:20] something that we can kind of roll and [44:21] now we're just kind of globbing stuff [44:23] onto this motion, but um to see if [44:26] realistically the the um the boat launch [44:30] could be a six-month [44:33] » Solution [44:33] » Solution to actually what I was [44:35] » That would be permitted. They'd still [44:36] have to buy a permit for that. [44:37] » What I was suggesting actually is that [44:39] the 25 spots be 6 months. [44:42] » Okay. [44:42] » Yeah. Put a sunset on the 25 spots. [44:44] » Yeah. [44:45] » Oh. That we try it for 6 months and see [44:47] how it works. [44:47] » Well, just through the season through [44:49] the through the winter because that's [44:51] it's very slow down there through [44:53] through this part of the year. That's [44:54] what we're hearing, right? [44:55] » Yeah. [44:56] » And April one or whatever it is. [44:58] » And then what I guess it's got conflated [45:00] with me saying then when the boating [45:02] season starts, that's when things [45:03] activity starts picking up again in [45:05] March. end of March, April. Uh and uh [45:09] and that would buy us some time to maybe [45:11] get a study in and start to look at this [45:13] and come up with a permanent decision on [45:16] what we're what we would do. [45:19] » I'm thinking that we just wait to make a [45:22] decision until and suggest that they use [45:25] the the boat ramp um starting October [45:28] 1st [45:29] » For eight hours. [45:31] » Well, there aren't any regulations that [45:33] would prevent them from doing that. We [45:35] make that recommendation to them. If [45:36] they want a spot for 8 hours, they can [45:38] park there starting October 1st. [45:41] » Mike Morz, do we [45:44] » Maintain? [45:45] » Do we charge during the winter? [45:48] » No. [45:49] » The only problem is then we have to [45:51] remove snow. I mean, if there's pile [45:53] » Because it's a liability. [45:54] » Yep. [45:55] » Yeah. So then maybe what we do is we [45:57] make that a a permit lot during the [46:01] winter [46:02] so that we bring in some revenue to help [46:06] pay for snow plowing on that. I don't [46:08] really want to make [46:10] » Sure the revenue offsets the expense to [46:13] » Yeah. I I don't want to add more plowing [46:15] to your guys because I know they've got [46:16] plenty to do as it is. [46:22] » We usually [46:23] » Yeah. Excuse me. [46:24] » Sorry. [46:28] And I think especially if the request [46:30] was we're looking at those 25 spots, [46:33] maybe we don't have to plow the entire [46:35] boat launch. Maybe the that, you know, [46:39] Eastern League lineup there probably has [46:42] 25 spots. I would like to make it part [46:45] of our system. So you either pay by the [46:47] hour or permit so we so we can capture [46:51] that income. [46:52] » Um [46:55] Yeah. And I I I think that that's [46:59] I think that's a good solution and then [47:01] see what happens come spring. If you [47:03] want to do or if we want to do some more [47:05] studying things, um we can at least get [47:07] that revenue and not you know, it'd be [47:10] hard to say no to to this request and [47:12] then for the next 6 months it's just [47:14] empty down there and we say nope, we [47:16] can't do it. So I I like that solution. [47:20] I just think that it's this would buy us [47:23] some time to get some more information. [47:26] » Yeah. [47:27] Not that the other thing to consider is [47:30] signage. [47:32] » We'd have to install some signage to [47:33] enforce it. Um [47:35] » Revision [47:36] » Ordinance revision. We'd have to, you [47:39] know, so I mean it's [47:41] » There is some leg work on this that we [47:42] would have to do. [47:43] » Yeah. I guess should you note that this [47:44] is a ordinance revision to allow for [47:47] these parking spaces that [47:49] » Okay. I think that [47:51] » Even the 25 would be an ordinance. [47:53] » 25 is an ordinance. [47:54] » Okay. So, and we're saying the lot would [47:56] be one too. [47:59] » That's a good question. I [48:01] » Well, you could try it on a temporary [48:02] basis before [48:04] » You stick on signage and [48:05] » You still have to sign it and you still [48:07] have to maintain it, right? [48:10] » One thing that's clean about this doing [48:12] the 25 spaces is the signage is there. [48:14] It's available. We can put that up [48:16] pretty easily. We can take it down just [48:18] as easy if you wanted to do it for six [48:22] months while we study. [48:25] » That would be my recommendation. [48:27] » And just so that they're aware that of [48:29] course it would be they're getting a [48:30] six-month permit and that may go away or [48:33] may not. [48:34] » Yep. [48:34] » So we prorate a one-year permit for 6 [48:37] months for them. [48:38] » Yeah. [48:38] » And then we put up signs. Do we have to [48:41] change do we have to do anything with [48:42] the ordinance before we do that? [48:47] I would just I would just do it on a [48:48] probationary period at probationary [48:51] basis at this point. [48:52] » Do we need to put a probationary sign [48:53] up? [48:55] » Whatever you'd like, mayor, [48:56] » I don't want to do I don't want to put I [48:58] don't want an expense of putting signs [48:59] up. [49:02] » Is that [49:04] » So [49:04] » Agreeable to you? [49:06] » Yeah. [49:08] » Rich's motion. [49:10] » Yeah. All right, Sam, what do you got? [49:16] a motion from no one in particular. [49:20] I [49:20] » I would say address the first motion. It [49:22] probably fail for lack of second [49:25] potentially, right? [49:26] » So now we need a fresh motion. [49:28] » Well, I'm just saying is there a second? [49:31] I can't ask. Well, you can withdraw it. [49:33] » I'll withdraw. [49:34] » I guess I thought it would. [49:35] » I'll withdraw it. [49:36] » Okay, [49:36] » Let's start over. [49:37] » I just want to make sure we're clean. [49:38] » Let's have a Yes. Let's have a clean [49:40] motion. [49:41] » Okay. [49:42] » You want me to make a motion? Sure. I'll [49:43] make a motion to [49:46] um change the uh existing 25 to [49:52] permitted work permitted 8 hour [49:55] um [49:56] » Oh, I thought we weren't going to change [49:57] those. I thought we were going to just [49:58] let them park in the the lot across the [50:01] street. [50:03] » Well, it's cleaner to to to have it here [50:05] with the the A and B. We got We've got [50:07] the signage ready for it. It's it's [50:08] available. [50:09] » Yeah. Prorating the 25. [50:11] » The 25. [50:12] » All right. So we allow them those for [50:13] the winter. Okay. [50:15] » Yeah. [50:15] » Yep. For a sixmonth period starting [50:20] » October one. [50:21] » Yeah. [50:25] » And [50:27] probationary. [50:28] » Okay. Need anything else? [50:30] » I don't think so. [50:31] » All right. Penny second. I'll second it. [50:36] » Any discussion? [50:40] » All those in favor? I I [50:41] » Opposed. Motion's approved. [50:44] » I've got nothing. Anybody? [50:45] » Well, is is there a part of this that's [50:48] a recommendation then to the [50:50] » The parking committee [50:52] » To start a process for a new study? [50:56] » Yes. [50:56] » Then we'll do a separate motion. [50:57] » I'll do a separate motion to recommend [50:59] that um we also [51:03] » Recommend to the park [51:04] » Recommend a a parking study to the [51:06] parking board. [51:07] » Yep. [51:08] » A second. [51:09] » Okay. Motion second. Discussion. [51:11] All those in favor? [51:13] » I [51:13] » Oppose. Motion's approved. [51:15] » All right. I still have nothing. [51:18] » Move to adjurnn. [51:19] » Second. [51:20] » Motion. Second to adjurnn. All those in [51:21] favor? I stand adjourned. Thanks [51:24] everybody. We'll give it five minutes. [51:26] We'll get started.