[0:05] anything um I'm happy to do it all but I'm okay just taking [0:11] not I I hear you had a big push for deliver it's been a long week yeah saage [0:19] contract went on Wednesday too so was like a last minute thing that happened [0:24] this week and there supped about like almost three weeks ago [0:28] now [7:28] I [7:36] yeah it does tell you when you join that Rec it's being recorded just so you [7:40] know yeah all right so [7:52] share it's not giv me that as [7:57] option not my chat no no yeah that's not what I want to [8:09] share [8:25] comens all right [8:30] yeah I'm use the ladies room before we get [8:34] going so I can [8:41] see so I'm like gonna be here basically if I could go out that [8:46] door I didn't nothing that's on my wish [8:53] L folks are welcome to come in um there's a sign in sheet at the [9:00] at the [9:27] entry here [9:35] the [9:53] flood so [9:58] there's [19:56] okay 6 o00 Bo so I'd like to go ahead and get things rolling um my name is [20:02] Stephanie Burke I'm a planner here at Rutland Regional Planning Commission and [20:06] we're so happy to be able to host this public meeting for the town of menden um [20:12] tonight we'll be looking at the alternatives for the US rout for [20:17] corridor scoping study this is the second public meeting that we're having [20:21] for this project and so with that introduction I'd like to just welcome [20:26] everyone um get settled in and I'll turn things over to the project engineer uh [20:32] Jen Conley with VHB hi everyone I'm going to briefly go [20:36] over the agenda and then we're going to do some [20:39] introductions um I would say as we get into the technical presentation my [20:44] request would be that um if you have a clarifying question you raise it while [20:48] I'm presenting we're going to have plenty of time for discussion afterwards [20:51] and can go back to slides if you have a comment or if you have a preference if [20:55] you like something or you don't like something but during the the during the [20:59] presentation please do interrupt if you have a clarifying question so that if [21:03] everyone has kind of that same question all of that information will get [21:07] shared iure how the system to advance the slides that's gonna be well Jen's [21:13] looking at that I did want to REM everybody who's joined virtually [21:16] received a message when they logged into the meeting but tonight's meeting is [21:19] being recorded so just for full disclosure okay so this is the agenda um [21:27] obviously we're going to start the welcome and we'll introduce the team in [21:30] just a second we're going to go over what the scope and schedule of the [21:33] project is one of the things we discovered right away at local concerns [21:37] meeting is we do have a lot of concerns in mendin but the scope of this grant is [21:41] pretty specific so we have to um do certain things as part of the grant [21:45] we'll talk about the project purpose and need and that was discussed at the local [21:49] concerns meeting and we'll talk about other local concerns takeway and then [21:53] we're going to talk about some overarching themes for the whole [21:56] Corridor before we break into different Alternatives in pieces along the [22:01] corridor so you'll understand what that means as we get into it and then we're [22:04] going to have um some discussion about Alternatives um evaluation and that's us [22:09] having looked at these Alternatives and we can talk to you about what those [22:11] potential impacts will be and then we will have a lot of time for public input [22:16] that's why we're here is to hear how you feel about these different Alternatives [22:21] um one of the things they are numbered one two and three throughout the quarter [22:25] but that doesn't mean we don't walk out of here with one in one segment two and [22:28] another and three and another it's really is um we'll talk about the pros [22:32] and cons of each um alternative in each segment as we [22:38] go so oops [22:46] oh okay so the project team as she in Stephanie introduced me I'm Jen Conley [22:51] I'm with VHB we are the consultant part of the Consulting team uh with me online [22:56] going to help me answer some questions that come up with our folks who are [23:00] remote is Elizabeth sunberg yeah there she is um and with me [23:05] here is oh Rose O'Brien Rose O'Brien um and [23:10] in addition we also have Joe vanor who supported us putting together all of the [23:14] um all the materials that you'll see here today you have already met [23:18] Stephanie from the Rutland Regional Planning Commission and then we have a [23:22] team who is helping to advise us and bring us along through the process and [23:27] so I would love maybe Fred if you could I don't know if everyone's in the room [23:30] or if some folks are online um I would love it if everyone on the team would if [23:36] you wouldn't mind introducing yourselves so I'll start um I'm Sarah Tully and I'm [23:40] the Town Administrator with the town of venden lry uh Fred Bagley uh member of [23:48] men on the move and a longtime men resident Larry crell steering committee [23:53] was on the select board for nine years Lancaster I'm a resident with Lon [24:00] on the move and missing this evening is Seth bridge and he is our select board [24:05] representative from menen that is on the committee great and then our other [24:10] partners in this the folks who gave us the Grant and we appreciate them and [24:13] they also will provide us input as we move along um Ashley Andrews and Ross [24:17] Gallen I don't know if anyone's Jo if either of them have joined us but we [24:21] have interacted with them and I'm going to give you a little bit of um input [24:25] that we've received from them recently on what we're going to talk about [24:30] today FR anyone else I believe there were there were some oops just like to [24:36] recognize the presence of Senator Brian Colmore who nicely joined us um and our [24:41] local representative Jim Harrison thank you both for joining [24:50] us so the project schedule this has been schedule since um we kicked off back in [24:55] May um we are at the Alternatives presentation meeting now and um we are [25:02] going to from here come out with a preferred alternative hopefully we will [25:06] be working with the steering committee at that point um on the details of that [25:12] and ultimately it's something that will go to the select board and we'll put [25:15] together then the final the final plan um the final [25:21] report so the project purpose and need we'll start with that local concerns [25:26] meeting recap so we presented a draft project purpose and needs statement and [25:30] some of the things that weren't included in that were the aesthetic improvements [25:35] and some um feedback about lowering the speed limit due to safety concerns in [25:39] the corridor um and during the course of the meeting we really talked about the [25:43] existing conditions what what we were looking at out there what the um the [25:48] traffic volumes were where the crashes had occurred um as well as some natural [25:52] resource mapping and then public input with this was a local concern meeting so [25:58] most of the meeting was spent hearing from you folks what what what was the [26:01] concerns and again speeding unsafe pedestrian Crossings um access [26:06] management big driveways that are difficult to to walk across um delivery [26:11] movements lack of Road markings or protection for those vulnerable users [26:16] and just various safety concerns which I know have continued obviously to be a [26:20] concern in the [26:25] corridor so the project purpose the purpose of the town of menden US Route [26:31] four coridor scoping study is to identify improvements to enhance safety [26:35] for all users along and across US Route 4 Bor through the town of Menan while [26:42] enhancing access and Aesthetics to the Village district and the recreational [26:47] resources so it isn't just in kind of the village district there was some [26:51] concern also with the number of recreation resources that we have in the [26:54] corridor and how can we make traveling to them from them and belong them a [26:59] little [27:01] safer so the needs were um there's no B pedestrian and bicycle accommodation the [27:07] corridor lacks safe Crossings sidewalks and bike Lanes um you know in the [27:12] commercial destinations and recre recreational resources really make it [27:16] challenging uh if you want AC cross to access those things vehicular traffic [27:20] calming uh the speeds on this quter are very high I'm sure that's not a surprise [27:25] to any of you um and they've been noted as such and the data that's collected by [27:29] VR um access management and intersection operations there are a number of [27:34] locations as we look on the corridor that have giant driveways and what that [27:39] does is it leads to um uncontrolled movements I'd say you don't know if [27:43] you're walking across that driveway if someone's going to pull out way over [27:46] here or way over here what angle they're going to be at whereas with a tighter [27:50] access it's a more controlled situation people have to do it more at a 90 degree [27:54] angle which makes it a little slower and a little safer [27:58] um Transit improvements was were also mentioned the corridor is served [28:01] obviously by the bus and um stops lack any kind of formal [28:09] accommodation so the project area is pretty clear it is the uh us rout four [28:14] corridor from one end to the other and mend end so it goes from Rutland town to [28:18] Killington and includes that that entire [28:24] Corridor so after we left the um the local concerns meeting and we have this [28:29] purpose and need I think a couple of overarching themes came up when we [28:33] started thinking about what what our alternative should be here so I'm going [28:37] to just talk about some of these overarching themes to give you something [28:40] to think about and we can get into discussion as I said later once once we [28:44] start evaluating alternative the the thing with these themes is that it they [28:49] are um they can be applied to any part of the corridor and so that's why we're [28:53] kind of bringing them up as a separate thing straight away so one of those is [28:58] access management there's already been as I a few times you've already heard me [29:02] say something about the the large driveways what we're showing here um in [29:07] this image in green is what could be let's call it a grass Island to better [29:13] control some of the access points this is just taking a a spot at Allen pools [29:19] in with the orchard across the street to see can we tighten up some of those [29:22] driveways of course you have to do it on a caseby Case basis because some like [29:27] Allen pools I can't tighten it up like I could a residential driveway because we [29:31] still need to allow for the move extractor trailer to pull in and and do [29:35] its thing on their site um whereas some some other driveways it's more [29:39] appropriate to go with a a narrower opening but the theme Remains the Same [29:45] that to have that much pavement makes the driver feel while they're driving on [29:50] us4 like they're on a bigger highway I like to um the perfect example of this I [29:56] find is Killington when you travel through Killington because the pavement [30:00] just keeps going up to those businesses it feels as wi it is as wide as a [30:04] highway that's why it feels as wide as the highway and people really lay on the [30:08] gas there um as soon as you start defining that edge and making people [30:13] feel a little tighter it does make people drive a little slower so this [30:18] this access management will improve the safety for folks walking along us4 but [30:22] it will also help to control those speeds it makes the driver feel like [30:26] they're in a place and have and they go a little slower to have um something on [30:30] both sides instead of just AAL pavement is that a clear concept people [30:36] know what're what we're talking about [30:41] there the other thing is safe Crossings and Transit stops so that came up and it [30:47] is it is a a tougher challenge to um accomplish on a quarter as varied as [30:52] this at the far left end we have the um the village District and there could be [30:58] a different type of Crossing in a village District maybe than there would [31:02] be out on us4 and so what we tried to do here was identify spots that seemed [31:08] appropriate for potential Crossings and um we we'll talk a little bit more about [31:13] um how to accommodate Transit stops as well but that's kind of an overarching [31:17] theme that that we would like to try to incorporate as we go through and build [31:22] the [31:25] Alternatives a longterm ter consideration theme is how to treat the [31:30] climbing Lanes one of the things that I was really struck by was the concern [31:36] about high speeds and as I said The Wider the road is the more comfortable [31:39] you feel driving it at a higher rate of speed so we did an analysis of those [31:44] climbing Lanes to make sure they are warranted at all locations now I don't [31:49] think anyone can deny that once you turn that corner past Sugar and Spice that [31:53] that is quite a hill and if you're stuck behind a heavy truck you're going to go [31:58] pretty slow and it's going to be frustrating so there certainly are [32:01] locations that based on the steepness and the number of trucks that climbing [32:04] lanes are very appropriate however our evaluations showed that there might be [32:09] some other stretches along this quarter and those are shown in green where it [32:13] doesn't meet the the warrant for climbing Lan and so we did have a [32:17] conversation with VR about this and of course because this grant as I mentioned [32:22] has some limitations this is really a bicycle and pedestrian study Grant so [32:27] elimination of a climbing Lane is certainly beyond the scope of this study [32:30] and not something that would be evaluated until a real you know um a big [32:35] construction job is done on the segment of us4 but V Trend did say it isn't off [32:41] the table in a longterm way and so that's something that I think I thought [32:47] was was at least a good potential for a way to slow the traffic down one of the [32:52] issues we know is the safety at the other parts of the quarter not just in [32:56] the in the village has been a problem especially this summer and so anything [33:01] we can do to cause the drivers to travel a little slower and even if that means [33:06] sometimes you might be stuck behind a truck um I think it is an advantage [33:10] towards slowing that traffic down so again this isn't something that [33:14] ultimately will be a buildable project that comes out of this grant but it is [33:18] something that we would put in if if the the group if um the engagement says yes [33:24] we're supportive of that that you could put into a long-term recommendation for [33:27] the [33:31] agent so now I'm going to get into those draft [33:35] Alternatives so we divided the quarter up to there little lag into three [33:39] segments so the first segment is what we called the you know the district segment [33:44] that's from Townline Road to meal Lake Drive and that is where we want that [33:48] Village District feel um we want that to be a little different than the more [33:52] rural segment segment two is a short segment but it's an important one [33:57] because that's a transition between what is the Village area and what is the more [34:02] rural area and so we wanted to treat that separately and have some [34:06] conversation specifically about that area and then the final segment is is [34:10] how do we want to treat from there all the way to the town [34:18] line so I won't list them here because I think it's more effective to actually [34:22] see them so in segment one which is the village the first alter alternative is [34:27] really a low build I would call it it's working with the existing pavement to [34:33] better define space for bicyclists and pedestrians and the way we can do that [34:38] is instead of having 14 foot Lanes we don't need 14 foot Lanes a more standard [34:43] Lane width is about 11 to 12 feet we can constrain the driver with the roadway [34:49] striping with with the the striping to create a little buffer space and then [34:54] establishing space on the edge of the road for bicyclist and [34:58] pestering so this is a lower cost alternative that just does a better job [35:03] than what you have out there today by making the lane widths narrower to slow [35:07] the traffic creating a buffer which we hope those cars don't drive into we [35:12] we're telling them where we want them to drive and we don't want them within two [35:15] feet of our cyclist or our pedestrian and then defining that space for [35:19] bicyclists and pedestrians so as I said this is more of [35:22] a low build alternative is this looking West this is right now we are looking [35:29] West yes this is that ski shop here in the far distance and J is there withd [35:35] right now to accomplish that in both east and west bound Lanes there is yes [35:40] so as you'll see in the picture on the left the existing is about a 14ot lane [35:43] in each Direction and a six foot shoulder so each side is about 20 feet [35:48] wide so I suggest we reallocate it and this is just at an example location it [35:52] varies by the width varies a little by location but at this location if we [35:56] reallocate that 20t on each side to an 11t Lane a twoot buffer and a 7 foot [36:02] shoulder that does a nicer job of keeping the cars away from you while [36:07] you're walking on that shoulder or while you're riding your bike on that shoulder [36:11] is that sorry does that at all increase um the potential for headon [36:18] collisions no 11 feet has has been VR is going to 11 ft in most cases it is it's [36:23] shown to be a safe um l a you want the bicycle Riders on the [36:30] opposite side of that line I would assume right in the line correct I don't [36:34] know if it work for you maybe if you put some grooves in certain areas of that [36:37] would help you out a little that that's one of the thing that is allowed in the [36:41] guidance that in those two feet you can use you know rumbles of some sort do [36:45] people's driveways but in certain open areas it wouldn't be worse yeah the [36:49] challenge if save someone's life driving at night too you know y yeah definitely [36:54] um one of the challenges you run into with doing anything with grooves though [36:57] is the noise they make so it it tends VR tends to get into trouble when they in [37:02] incorporate those near when they first been which was really good move because [37:05] doesn't make people go on the side of the road I thought people [37:07] had B breaks hear that yeah but certainly is [37:12] something that you know that buffer area you could put that in just to remind [37:16] people I mean it certainly I will tell you when you drive in the snow which we [37:19] all do um having those in the center lines when C line I mean you know the [37:24] road's covered in snow you don't know where that double is it's a nice [37:27] reminder plus a lot of tourists and other people some truck drivers they [37:30] just take the wrong lane and try to keep the momentum B right there was another [37:36] that my question too okay okay so we're clear on this is like [37:41] I said I i' call this a low build because it's a little less expensive [37:45] working with what we have so again in segment one in the village district one [37:49] of the things we looked at was putting in a 5 foot sidewalk on one side of the [37:53] street now with that one of the things that patrian was concerned about is [37:57] still maintaining the roadway width so they want there to be um a six foot [38:04] shoulder uh and in this case an 11 foot lane 11 to 12 feet that they tend to [38:08] like but um I think in the in the village District we convinced them 11 [38:12] feet is appropriate um and so that does come out to be five feet wider than what [38:18] we currently have so I call your attention to that now we'll get into the [38:22] evaluation later that does have an impact that five sidewalk then is [38:28] outside of what is the existing paved width so if you think of where the [38:32] pavement ends starting at that point is where your sidewalk would be so that [38:38] does have an impact it is still within the right of way it is still within [38:41] vran's property but it will have a perceived impact by the people who live [38:46] along that stretch you'll you'll feel like people walking on that sidewalk are [38:50] closer to your house than you're used to the traveling public [38:54] being any questions on not yes how much pedestrian traffic is [39:00] there is more well so there isn't a lot of pedestrian traffic now but I think a [39:04] lot of that is because of how inhospitable the environment is and we [39:08] know we see people cross between sugar and spice and the mini golf for example [39:14] so there are some pedestrians we know that the coffee shop obviously created a [39:19] new destination and there is the hope I know um the steering committee told us [39:23] with some um potential changes to zoning and more more businesses coming in they [39:29] want to encourage this sort of environment and create more of a a [39:33] downtown now this is part of your grant program that you're dealing with this [39:37] right now yes so what ends up to is a grant big enough to do that or should [39:41] you be looking at a tiff well let's let's talk about um the grant process [39:45] the grant that we have currently is to do the study and come out with [39:48] recommended Alternatives that is a tool the town then uses to apply for the next [39:53] grant for construction so it is something when we get to the end we'll [39:57] talk a little bit about costs of things and um you know you don't want this to [40:02] be yes of course you could say yes we want a shared use path on both sides of [40:06] the road in fact we want separated C great separated Crossings let's put [40:10] bridges over for people to cross that's great but that might not be a fundable [40:14] project so I you know when we get to that point we'll talk about um you know [40:19] we want to create we want this to be a plan that is buildable and implementable [40:25] ultimately which is again why it's important P [40:29] trans and talk to them about these things so this is another alternative [40:34] for segment one what this does is it it creates that eight foot chair PA use [40:39] path instead of a five- foot sidewalk it's now wide enough that someone can be [40:44] riding their bike on it as well um so that takes that bicycle traffic if you [40:49] are a strong cyclist we know there's so many out there who ride route four all [40:53] the time which is great for them but not all of us feel that comfortable on Route [40:58] four and would much rather be on a path on the side so similar to the sidewalk [41:02] alternative obviously this does have an impact this does widen things um and you [41:07] know as such that does have an imp but it does help that cyclist which [41:13] you you know the the goal as I said the purpose and need of this study was to [41:18] attempt to better accommodate um BOS and pedestrians [41:25] both that extend outside the RightWay no there's still plenty of RightWay [41:31] yes so um in segment one as we talked about climbing Lanes we have we I have [41:37] two things to touch on here um the the beginning of it from Town Line Road is [41:42] warranted it is steep enough the truck numbers are high enough it is [41:46] appropriate to have a climbing Lane but as we all know you feel like it closes [41:49] and then it almost immediately opens back up again and um one of the things [41:54] that we could do here is close it sooner which would provide in that Village [41:58] District a um you know a lower traveling speed because it would calm the traffic [42:03] a little bit so this is certainly something we we hope VR will consider as [42:08] as projects move [42:13] forward so one of the things I'm going to mention here as I said one of our [42:16] themes is strategic Crossings and when we get into the conversation we can talk [42:21] about like I said I have been here often enough I've been to Bull Sugar and Spice [42:26] and men and minii golf often enough and I just drive through this corter I know [42:30] that I have seen enough pedestrians Crossing at that location it was also [42:35] suggested to me another potential Crossing location especially if there's [42:38] a sidewalk or a shered 's path on one side of the street would be down by the [42:42] orchard in in Allen pools and so those are two locations that folks have [42:46] brought up to us in in public feedback um we can talk about whether those are [42:51] the right places if we were going to put in crosswalks or if we should be [42:54] thinking about other locations [42:59] in in this location in a village environment it would be a striped [43:03] crosswalk like you're used to seeing here in R and do you expect traffic to [43:07] stop while people are walking through that or how how you trying to figure [43:10] that out yeah I mean that is the law we know [43:16] trying of course and so what we try to do with this is we're trying to slow the [43:21] traffic with our design and bringing the paving the aspect to it yeah yeah [43:27] slower it's then easier for you to see that Gap it's easier for them to see you [43:31] before they're on top of you you know it does make a aest and Crossing is a more [43:35] safe option do they those lights they have where you can push a button and [43:41] they flash that that is always an option yeah to have that sort of a treatment um [43:46] we can talk about just in general lighting I know that's something I think [43:49] Fred had brought up is you know whether lighting was um you know is lighting [43:54] appropriate isn't in the right places and certainly where we expect [43:57] pedestrians to across is a very appropriate place to be careful with our [44:00] lighting have you looked at um lighting up that whole Road I have not looked at [44:04] it but that is something that at the end of this as we get into our discussion [44:08] about Alternatives that's when we have that conversation if we think that's [44:11] something that's appropriate because something like lighting and any [44:14] aesthetic improvements can be added to any um any of the [44:21] Alternatives um and especially if we do put in a sidewalk or a crosswalk um [44:26] periodic lighting along it is a nice way to bring drivers's attention to the fact [44:30] there's an expectation of pedestrians even if they're not there at the moment [44:33] there's the expectation of them being [44:38] there all right if there wasn't any technical question on segment one I'm [44:43] going to move into segment two anything pop up on line yet Rose [44:49] okay all right so again this is the what I call the transition zone from Meadow [44:55] Lake to Medway there we um and so right now this is [45:01] just a screenshot of a certain spot that's 44 and a half fet wide um it one [45:06] of the things I don't like about this area is the 15.5 foot um Lane in the 6 [45:12] and 1/2 foot shoulder how many of us have seen someone fade over to the right [45:17] and someone they'll so they'll be driving to a breast here that is what we [45:21] don't want because that is everyone jockeying to go faster and so that that [45:26] is definitely a problem and an 11 foot shoulder becomes a problem at times too [45:30] because you can have someone think that that is Lan as well so although it's [45:34] great to have a generous shoulder to make a a cyclist or a pedestrian feel [45:38] safe they don't feel safe if a car comes down because 11 feet is wide enough to [45:42] be be a lane so this is again kind of the lighter alternative because it still [45:47] works with the width we have it reallocates that width now um because [45:52] again the width varies in this transition zone significantly what I've [45:56] put here is we could go with a 12T Lane and we could have a minimum of a twoot [46:00] buffer again to Define that space for pedestrians in a Min minimum of a six [46:04] foot shoulder the buffer space however as the road widens the buffer and that [46:11] shoulder space can get bigger what we want to do is not necessarily have a tw- [46:16] foot um buffer into really really wide space I don't want someone to think it's [46:20] a lane we want to balance we want it to be clear this is too narrow to be a lane [46:24] this is the buffer in the the bikes and the the pets are are on the other side [46:28] of that and one of the things I would like to do in this segment if we can is [46:33] make the line striping match what we want that until they're out of this [46:38] transition zone it doesn't widen so that folks can use it in two lanes as they're [46:44] getting their speed on and going up the hill we want to keep it in a single Lane [46:47] and keep the speeds low in this transition zone you ever cross an area [46:52] because I've seen a lot of people use the shoulder think it's a lane it's [46:57] pretty SC most most definitely um yes so there is there there's uh you'll see [47:02] some markings actually in the next um the next concept um that Define that and [47:07] one of the things you do especially if you're trying to transition from what [47:10] will be a high speed as you're come down the hill into the village District which [47:14] we're hoping we're really going to lower that speed um you paint those lines so [47:18] they get closer so that you feel like you're accelerating even if you're [47:22] keeping your same speed and it if that is another effective tool to to work [47:26] with the drivers joh if you put lines on the opening there because they w't stick [47:30] in the lane but if you just put some yellow lines through it it would [47:34] probably stop people from doing that yeah even the double line is very [47:38] effective because it you know if there's a single line it could be just a lan [47:42] line once it's two it it does cue folks that it's something [47:47] different so one of the things we also talked about is in this transition zone [47:52] should we do something like striping with delineated marking there should we [47:56] do something with either banners or signage or something so this is the same [48:02] Geographic um not Geographic excuse me this is the same like Lane configuration [48:06] as I showed before but it's just should we do other things to make people [48:11] realize they're arriving at a place because that does tend to make people [48:15] slow down and I'm going to give some other example those were just a few [48:18] examples so these are other Gateway treatment examples that people use [48:22] whether it's fencing whether it is a line of planted treat that makes you [48:27] feel like you're in a place whether it's banners whether it's lighting um there's [48:31] a number of options there and you know we can talk about that when we get to [48:36] discussion but that's alternative to is really about we can do whatever we want [48:41] with the striping but how else can we communicate to the driver they've [48:44] arrived somewhere because this section I don't think is appropriate for [48:49] pedestrian treatment it's very steep it's you know drops off it it it doesn't [48:54] call out for that sort of arrival we want them to realize they're arriving at [48:58] a place in a different way and so we're going to try to think of what cues we [49:02] could do so that's our second [49:08] alternative and then our third alternative is again looking at what we [49:13] can do with widths and how we could if we did tighten it up as I showed you [49:18] before we had on that one a minimum of two feet in the buffer up to four feet [49:23] shoulder was a minimum of I think six feet and it could be if we kept the F [49:28] narrow here in this example for you can see the the red shading is two and a [49:34] half feet of the road goes away basically should we make the road [49:37] physically narrower is there an opportunity in this transition zone to [49:42] really make the driver feel like they're they're being tightened and they need to [49:46] go slower to communicate to them and so in this situation it's not just striping [49:51] the edge to edge it's should we actually narrow that a little so they feel a [49:55] little more constrained as they're coming into this [50:03] Z any questions on segment two we had a question online about segment one it was [50:09] asked if the shared use path or sidewalk would be from metalik drive to Townline [50:14] Road and what would happen to the cyclists and pedestrians once that ended [50:18] if that alternative was chosen so that can be determined today we laid it out [50:24] as if it would be that higher length to answer that question and um in [50:29] situations where you have a shared use path that isn't leading to something [50:32] else you do typically sign that and you think about where the folks are going to [50:36] want to go at the end so do you put a turnaround at the end or do you assume [50:41] that they may head down metal Lake Road or you know what what is it that they [50:44] want to do at that point and think about where where else they can go whether [50:48] it's just for recreation and they'll you turn and go back or whether um but [50:53] either way we we would sign if that the path would [50:59] um just for discussion um we also thought that it was a safe access to get [51:06] off of um route four and go down Park Lane into Post Road in Rutland town and [51:11] be able to access their Recreation H area and then they're doing a sidewalk [51:16] project off of Post Road so I think we're not the only Town looking at this [51:21] Killington is underway with a study similar to this on [51:26] um on rout four as well so I would expect that Rutland toown may be [51:31] interested in doing something similar as well before you get down into Rin [51:37] City can you go back one slide to the one where you reduce the total width by [51:42] two feet is are there guard rails and stuff and that's that would yes and so [51:47] in this in this case we wouldn't suggest to eliminate the guard rails but I mean [51:52] if you if you were to to you have to move the guard in is that is that you [51:57] don't because the guard rails are still protecting from the hazard the hazard is [52:00] the Steep Bank yeah so in that case the guard rails can stay where they are um [52:05] it's just a matter of if it is gravel for those last two feet even if you were [52:09] to go astray you would you know the idea is you still feel like you are are [52:15] narrowed you're so there's no federal requirement that the guardrails have to [52:19] be at the edge of the pavement there can be a twoof foot buffer or something [52:22] there certainly can yes I mean in a lot of cases guard gril or even on the other [52:26] side of you know pedestrian facility I [52:37] mean all right getting into segment three so to start out with segment Three [52:42] As We Know looks a lot like this most of the time um and so this is that same [52:47] kind of low build that we talked about this is reallocating that existing [52:52] pavement to make the leans slightly narrower so that we're able to get that [52:56] buffer and to get that six foot shoulder um and depending on the area in some [53:02] some places I can tell you again much like segment two that buffer in that [53:07] shoulder could be pretty sizable because the the roadway width is very [53:11] significant but this does a better job of not creating what feels like a lane [53:17] for example you know the S feet and existing you have a 12ft lane a 12 and [53:21] a2t lane and then a 7ot shoulder that does feel like those are Highway itions [53:25] you feel like you can drive it like you're on I 89 and so if we are to [53:29] narrow the lanes and put in that that narrow buffer to to just provide that um [53:36] that space between the the cyclists and the pedestrians and the traveling public [53:40] that's again that low build [53:45] alternative okay alternative two is hard to see but it is an 8ft shered juice [53:51] path on the North side now one of the things that we'll get into there's a [53:56] there's a bunch of evaluation that we talk about impacts as you might imagine [54:00] there are some impacts we can easily accommodate an 8 foot shared juuse path [54:06] within the right of way the right of way here is incred was it 30 feet outside of [54:10] the pavement width on each side yeah like 25 to 35 yeah so there's 25 to 30 [54:15] feet of Right of Way Beyond what is currently paved so we are able to [54:20] accommodate this what we would suggest is a shared use path that would not be [54:25] located right next to the road obviously it's safer if it's a little separated [54:29] and it'll be a nicer path to travel if it's a little separated however you'll [54:34] see and I think it might be my next slide um there are some constraints we'd [54:38] have to think about when we think about a shared use path though we were [54:42] thinking about what we had talked about here and what our purpose and need said [54:46] in the locations where it may be appropriate for a shared use path would [54:50] be between the New Forest Service headquarters where we expect there to be [54:55] a hub of activity and people that are going [55:00] hiking excuse me we know also that obviously at the other end of the [55:05] corridor there is um the Appalachian Trail The Long Trail the Catamount Trail [55:11] and soon we're going to have the bellamont trail passing through this [55:21] area um so looking at what an8 [55:31] foot if you at the local concerns meeting you've seen this graphic and [55:38] this calls out some of those things I just mentioned the the forest Service [55:41] headquarters is located down here the Vista senior living and the um [55:47] Killington Resort housing in the middle and then further up is where the [55:51] appalation trail and the Long Trail Crossing [55:54] is this is the resource mapping that I shared although it's hard to see the key [56:01] you can tell that there are a number of wetlands in the bright green there are a [56:05] number of river Brook Etc Crossings there are there are certainly some [56:10] hazards now um talking to permitting experts is still something that is [56:16] permittable it is possible it will have some impacts to Wetlands but those [56:21] impacts will be linear and will be on an existing transportation [56:25] quor so it is they are likely to be approved and in addition we have the [56:31] flexibility although we would like a larger buffer if we did put in a shared [56:35] use path we have the ability to move it closer to the road the road Edge in a [56:40] lot of places has almost a 10- foot shoulder and then a 10- foot like graval [56:44] area that's pretty much graded so we could get pretty close to the edge of [56:48] Road and have very little impact to um to Wetlands as a result so [56:56] um excuse me I'm so sorry ultimately a p a path like this [57:02] we're showing it for about two and a half miles um does have obviously a cost [57:07] associated with it and we'll get into some of that in the [57:15] evaluation we also thought about a shared use path on the cell set I I'm so [57:20] sorry have a tickle in my throat now [57:28] we didn't have another question online just about segment two and if there [57:33] could be an option for creating a separated path near the river um so [57:38] bikes and PS aren't up on that section of Route [57:41] four um that is probably an option but we have to look at um there are [57:48] certainly of a part as we know where the river is within the right of way and so [57:53] that may be possible the exact alignment would have to be worked out as it were [57:57] to move along if that is the preferred alternative we' do a little bit of [58:01] looking at what that potential alignment could look like um and that is [58:05] appropriate but obviously Where the River crosses outside of the the right [58:09] of way it becomes a little bit more difficult because that land is not under [58:12] um VR [58:15] control um so this this contemplated the sheries path on the South Side uh [58:21] similar issu similar resource you know constraints but the RightWay is generous [58:28] and it certainly is a potential alternative how do you get over the [58:32] cobbert there's some huge certs going up on that [58:36] road well I would liken it to the existing um you know the way the Long [58:41] Trail is handled you can do a really low profile Bridge or [58:46] something you know or or put in a smaller Culvert or you know an [58:51] appropriately sized Culvert depending on where exactly it's going to be but it is [58:55] certainly a challenge and in some cases especially when the menion brook is Big [58:59] it may have to come up by the road by the road for a bit some of the C on my [59:03] store is probably you know bigger than the ceiling and one of the things we' [59:07] have to look at too is you know what is the the life cycle where are those culit [59:12] in their life cycle and is it appropriate is there a Time coming where [59:15] they're going to be replaced anyway could they be sized to accommodate well [59:18] you go I don't know how you do it I'll just no no no it's definitely it's [59:23] certainly a consideration any other questions could you just um [59:28] review on on each of the three Alternatives um what if it's going to be [59:34] on one side or the other side what about the cyclists who are going in the [59:38] opposite direction yeah so in any of these Alternatives we would still have [59:43] much like um we wouldn't be changing the roadway [59:49] configuration so we would probably still propose something like this for the [59:54] roadway configuration to define space on Route four because you are always going [59:59] to have a cyclist who prefers to be on the road and not be on a path with as [1:00:03] lot pedestrian pedestrians walking you will have that cyclist who wants to get [1:00:08] speed and and act almost more like a car and I was I was thinking of cyclists who [1:00:13] are using the pavement on one side of the road yet don't want to cross all the [1:00:19] traffic just to get on uh the selected path on the other side entirely possible [1:00:25] and um and in this case we're still trying to Define that space with [1:00:29] buffers on the road thank you they vary the whist pretty wildly on that road [1:00:34] though don't they they do yeah they really do yeah yeah and so that's [1:00:38] something obviously I think that I think well I think it's obvious but we'll see [1:00:42] if you all agree um that you know moving forward in a long-term situation that we [1:00:46] would really want them to be a little more careful about what th what those [1:00:49] Lane widths would be and again to manage the shoulder if the shoulder is going to [1:00:53] stay as wide as it is let's make sure it's defined with a buffer to to provide [1:00:58] that extra space because if you are within three feet of a tractor trailer [1:01:01] going by you you don't feel so good you know so you really wanted to find that [1:01:06] buffer [1:01:11] space any other [1:01:15] questions all right then we get [1:01:22] into so one of the other things we talked about were bus stops now bus [1:01:26] stops are a little bit more complicated because again this segment is a real [1:01:31] rural segment um and it isn't there isn't one a location or an appropriate [1:01:39] place to put a bus shelter that's going to be outside of vr's clear Zone that [1:01:43] they like to maintain so one of the things that we were thinking about and [1:01:47] there is one in the study area but it is not as good so the farle picture is you [1:01:52] know a pull off that's in the the study area is right near Willer road that [1:01:56] pulloff however is very long and you can at a high rate of speed pull into that [1:02:01] pull off that is not what we're proposing here what we would be talking [1:02:05] about is one of the other two on the right which are two others that are [1:02:08] located on Route four that I was familiar with they are very tight if [1:02:11] you're in a car and you want to pull into that pull off you have to be going [1:02:14] about 10 miles an hour to pull into it it's very short it comes up on you in [1:02:20] um the the way it is designed does not allow for a car to enter it at a high [1:02:27] rate of Speed without them hitting the guardrail and so what we would propose [1:02:31] and VR would be amendable to is especially at all Turnpike Road which is [1:02:36] really the location that has someone waiting for the bus the most often that [1:02:40] I have seen it and we've gotten the information from the bus and it's [1:02:43] confirmed that's really the stop other stops have a person occasionally but [1:02:47] this is the location that very consistently has um Transit folks [1:02:51] waiting for transit or getting dropped off um I would propose something on the [1:02:56] far side from Old Turnpike that um just provides a little bit of space there for [1:03:01] for the driver for the um person waiting for Transit but that but also does it in [1:03:06] a way that the transit allow it but that it is not appropriate for someone to [1:03:11] enter at a high rate of speed that the driver would not be tempted to use it in [1:03:16] some way so that it is a safe space for a pedestrian to [1:03:23] stand and did you look at turnarounds at all [1:03:27] in that road because that's a big problem too we did not I mean it's a [1:03:31] little bit beyond the scope of you know there no I mean I have people do it in [1:03:36] my driveway all time which I don't really care it's not a big deal um but [1:03:39] it seems to be a problem with people you know get or something like that and they [1:03:43] have to turn around which would maybe we can slow them down so they don't miss [1:03:47] their turn y so one of the things we talked about [1:03:52] is in this segment if I were to put in strategic Crossings where would I put [1:03:56] them and how would I do that [1:04:00] so and again we can get into a debate later but the locations I identified is [1:04:05] obviously that existing Appalachian Trail Long Trail Crossing we know all [1:04:09] summer there's people crossing there um another location is a is at mend [1:04:13] Mountain View with the um discussions that VRA may be converted as well to um [1:04:19] Resort housing if that ends up happening and there's cross traffic there's a [1:04:25] carless population at both locations who work together up on the mountain there [1:04:29] may be cross you know pedestrians Crossing there and there may be some [1:04:34] folks associated with the forest head um headquarters that are catching the bus [1:04:40] or you know whether it's they work there or they went there when they're hiking [1:04:44] some of the trail or something that may become a destination the road across [1:04:48] from it too yes Y road across the street from it um so those were a couple of [1:04:54] locations I identified we certainly can talk about those a little bit more as as [1:04:58] we um as we move along and we can talk about what those impacts would [1:05:04] be and again as I said that long-term consideration something that um brr [1:05:09] could keep in the back of their minds for when they reconstruct this room [1:05:13] you'll see in segment three there is a an area [1:05:17] that's now although for that stretch things are pretty flat and that could be [1:05:22] a candidate for elimination the climbing Lane it is only a half a mile long it is [1:05:28] or it's less than half a mile I believe it is not long enough to transition that [1:05:33] climbing Lane in and really have any distance to travel before you have to [1:05:37] transition it back out again so we do not suggest that it be eliminated in [1:05:41] that segment however there is what I believe is about two and a half miles or [1:05:45] something to that effect of additional climbing Lane that makes sense if we can [1:05:51] eliminate it to be able to eliminate it and that would in that far section of [1:05:55] the corridor might help us to be able to narrow the road and slow the traffic [1:06:00] down and although there still would be climbing Lane through a big chunk of [1:06:04] mendan if it's slower and calmed at one end and slower and calmed at the other [1:06:09] end that just that changes kind of the way the driver is approaching driving [1:06:13] through the sper again this is a longer term [1:06:17] consideration and this is something beyond the scope of this project but is [1:06:21] something that came to mind to me when we were really concerned about speeds [1:06:25] and how do we change the character of the now I'm going to Bor you to death [1:06:31] with a million CS here the evaluation Matrix so some this first one is [1:06:36] particularly important which is thinking about cost safety and Community [1:06:40] character in segment one and so as you can see in general all of our [1:06:46] Alternatives bring us some improvement defining the space better or providing a [1:06:51] separate facility is going to make bicycles to The Pedestrian feel a little [1:06:54] safer it can in some cases improve the aesthetic it does satisfy the purpose [1:06:59] and need of this study every alternative gives us some positive the uh cost [1:07:05] associated with alternative one which is working with the just changing pavement [1:07:09] markings obviously is less than an alternative that provides a sidewalk or [1:07:14] a share [1:07:18] DP any questions so far we can back if you're [1:07:23] doing the first that's cheaper yes you develop that into a do you understand [1:07:29] what I'm saying yes you know so was you know you laying out x amount of dolls [1:07:33] and if it seems to be working you can push it into the other area certainly [1:07:36] that is something that ultimately we can talk about is how to phase improvements [1:07:40] as well if there's something that you like here but that you think you know if [1:07:45] we want to be competitive to get another Grant maybe we go for this and we see it [1:07:48] do pedestrian start using the quter and if so we go for that we can talk about [1:07:52] some of that as well [1:07:55] all right in segment two which is our transition zone alternative one again [1:08:00] was working with the current width and making some changes alternative to is [1:08:04] considering some plac making um and again that could be a wide variety of [1:08:09] things depending on what you all are interested in we thought um banners or [1:08:14] you know something to Define your arriving at the town or and then um you [1:08:20] know the delineated markings and again providing the buffering for the [1:08:30] shoulders any questions on [1:08:38] that okay and then the third one is the rural segment now again alternative one [1:08:45] does start to improve things for cyclist and pedestrians by defining space the [1:08:51] other Alternatives in a bigger way meet the purpose in need because obviously if [1:08:55] you have allow those cyclists and pedestrians to be in a separate facility [1:08:59] it's safer for [1:09:06] them then we start talking about those anticipated um impacts as I have laid [1:09:12] out to you the right of we this Corridor is very generous so we don't anticipate [1:09:16] our Alternatives having an impact on the right of way we don't anticipate much of [1:09:21] an impact to utilities there could be some depending on where we're going to [1:09:26] try to avoid the wet lens which is also identified as a potential impact [1:09:30] depending on the alignment there are some utilities there that um you know [1:09:33] there's some overhead wires that um we need to work around those pools Etc any [1:09:38] impact as I said would likely be on the Lower Side um but those those impacts [1:09:44] there is a potential for that because unlike working in the roadway footprint [1:09:48] we are going further [1:09:52] out in segment two we really are not [1:09:56] proposing to make the road further out the road is plenty wide and our [1:10:00] Alternatives who have presented here today are trying to make it feel [1:10:03] narrower and trying to Define it so the impacts really are are nothing in this [1:10:09] in this area with the exception of the cost that we've already [1:10:13] talked and then in segment three there are um you know a little bit more [1:10:19] there's some agricultural lands that need to be considered there's Wetlands [1:10:22] that need to be considered for potential impacts we do have plenty of right of [1:10:26] way that is not an issue um but there are going to be new impervious surfaces [1:10:31] so that is something that um is just something we need to keep track of and [1:10:36] you know we can talk a little bit about that you know as far as as we do [1:10:48] permitting okay then there's the anticipated permitting now most things [1:10:51] are not anticipated in segment one because we are working in an area that [1:10:57] does not have much in the way of environmental or um resource constraints [1:11:02] as the rest of the corridor did and in many cases we're keeping our footprint [1:11:06] pretty close to what it is we're just going slightly outside so the um [1:11:10] permitting is not anticipated to be significant in segment [1:11:21] one um as we get into segment two as well we're staying in our same footprint [1:11:26] we're not expecting issues with permitting permitting that should be [1:11:30] pretty straightforward segment three however [1:11:34] though when we're talking about a separate shared use path alternative two [1:11:37] and three end up having some more per permitting [1:11:41] implications um and there are certainly some things we need to be thinking about [1:11:46] if we go forward with those again talking with a permanent specialist [1:11:51] about those there was nothing here that was a big alarm as I said like through [1:11:55] the Engineering Process given the amount of right of way available chances are [1:12:00] that permits could be um you know sought and obtained um but again it's just [1:12:05] something else to be considering as we move forward and if you're increasing in [1:12:11] perious area wouldn't you be subject to storm water permit yeah Didn't I [1:12:15] operational not the construction oh was the wrong one oh yes I the wrong one was [1:12:22] highlighted sorry about that [1:12:30] yeah okay now we will have some public input as I um outlined Elizabeth is [1:12:37] online and um Rose is is monitoring that as well if there is input that um folks [1:12:45] online want to give would' love to hear from you as well but we'd love to hear [1:12:48] from everyone in the room what what we're thinking about what sounds what [1:12:52] sounds good what sounds bad what are we reacting to this is where we try to get [1:12:56] that feedback on Alternatives so that we can understand what direction to head in [1:13:01] for a preferred alternative to move forward yes so I'm a fairly new um [1:13:09] resident to Menan I've only been here a few years um and I absolutely love it [1:13:14] but um where I lived previously I had the joy of sitting on several meetings [1:13:19] like this my question to start before I go through my is where does Menan see [1:13:25] ourselves as a town 25 to 30 years from now because in my opinion that should [1:13:31] be the guide star for does you know a pedestrian space [1:13:39] along the side of the road Mixon or are we trying to recruit people to come and [1:13:44] visit the town are we trying to recruit businesses we trying to create a walking [1:13:49] space and connect the rural area to the more populated Village area so that we [1:13:56] create more of a destination I don't know if anyone from the town can speak [1:14:01] to that well I have a reference that you should look at and it's called Men the [1:14:05] movie if you haven't seen it yet it it is um quite a process I wasn't a part of [1:14:11] it but it's very impressive um they form subcommittees they really dealt into [1:14:16] topics just like you're asking about as to where where they saw each other and I [1:14:20] don't know yeah I'll just briefly discuss the men on the WF project um uh [1:14:26] we out of that came two priorities that the town set for ourselves and um one [1:14:33] was boosting outdoor recreation so we are keeping our eyes open on how to [1:14:38] increase opportunities to boost outdoor recreation in mendum um and we we think [1:14:43] that some of these Alternatives will help facilitate that and then the second [1:14:47] one was the um reinvention of Route four um and safety the reinvention and safety [1:14:56] of Route four I think is the um the terminology and so um those of us that [1:15:02] have been here a long time have seen the decline of businesses along Route 4 um [1:15:08] that has impacted the grand list and increased property taxes for residents [1:15:16] um the Vista View reinvention of that building from a Hospitality business to [1:15:22] a the Vista Senior Living is is an example of thinking outside the box and [1:15:28] where is mendan going um we do have a town plan that does get updated and we [1:15:35] have the zoning that um is slighted to be [1:15:40] updated um they're going to apply for a municipal planning Grant this year in [1:15:44] order to update our zoning regulations so um really looking at what's in those [1:15:49] regulations to broaden the ability for um development or reinvention of Route [1:15:57] four is what you know those will be looked at as well with the Planning [1:16:01] Commission so and going back one step further for those who weren't involved [1:16:06] the town applied for a grant to Vermont Council on Rural Development to decide [1:16:12] what could we do with our downtown section and we were denied because we [1:16:18] didn't have a downtown and in everybody's definition of what we were [1:16:23] we were a highway town we were a pass through town or a missed Town depending [1:16:28] on who was describing us so the ront counil on Rural Development said you're [1:16:33] not a town you don't qualify to decide what to do with your town but about six [1:16:38] months later they came back to us on their initiative and said you know we [1:16:42] thought that a little bit more there's lots of towns in our state that don't [1:16:47] have downtowns and we need to help those towns who just are Highway towns F town [1:16:53] pass through town so they came back to us worked over the course of the year to [1:16:58] develop The Mending on the move and all those projects came out of it so Co [1:17:03] whacked us a little bit no doubt about it but um you know those the document [1:17:08] that thinking has all it's all there this is then we that Vermont Council rur [1:17:16] development initiative we were going apply for the grant to got these folks [1:17:19] to come here and look at what we can do at least on the rout for [1:17:26] while thank you um so phenominal work that's been put in and I hate that I [1:17:33] missed the first meeting on this um but I was out of the country uh so the a [1:17:39] couple of questions that I would have would be if we're looking at the first [1:17:44] section and the third section potentially having a shared use pathway [1:17:49] even though section two is a little steeper would it not make sense for that [1:17:53] to be a continuous pathway promoting cycling from town all the way up um you [1:18:02] know and being able to connect maybe all the way up to the Irish pub and back and [1:18:06] there is your destination trip I'm going to ride my bike up to the Irish Pub come [1:18:10] back and get ice cream you know at at mini golf um the the next one would be [1:18:20] um from an impervious servfaces standpoint could that multi-use trail be [1:18:27] more of a carriage Trail P gravel type setting and then we're getting away from [1:18:32] having to deal with the impervious uh surfaces permitting and reducing the [1:18:36] cost because Paving just needs to be regraded in the [1:18:39] spring um another mostly from a safety [1:18:44] standpoint because I really wanted to make sure this got brought up um as [1:18:49] we're looking at this stretch you know what could be done at the corner of [1:18:55] Journey's End and four um particularly [1:19:00] the northwest corner um so if you were coming out of Journey's End Road and [1:19:08] turning right onto four that corner um the visibility is [1:19:16] dangerous uh and I know that that road has changed involved over the years [1:19:20] there are now a lot of young drivers on that road and there are children so [1:19:24] there will be a continuous flow of young drivers on that road um can we take it [1:19:30] back to do to look at cutting the trees on that northwest corner and maybe [1:19:35] shaving down the hillside a little bit especially now that it's mowed on the [1:19:39] northeast corner um you can see a whole lot better uh and if we had greater [1:19:44] visibility there then we're reducing the likelihood of accidents um so that's [1:19:51] that's my safety thing to throw out yeah well and I'm happy to address that your [1:19:56] comments on a continuous path or whatever that's what this discussion is [1:20:01] about um you know is that something so so I'll leave that to everyone to [1:20:05] discuss but safety is outside the safety for drivers is outside of the scope of [1:20:11] what I'm doing here today however that it also impacts safety but I would [1:20:16] advise you and your elected officials that there is power in contacting transs [1:20:23] and requesting them to look at sight lines safety is a big thing the history [1:20:28] this summer has been really bad here in Menon this is a bad Corridor so I would [1:20:33] say don't don't think just because that's beyond the scope of what I'm [1:20:37] doing here that there isn't something else that could be done to evaluate [1:20:41] sight lines because that is a very specific you know you're not asking them [1:20:45] to rebuild the whole Road you're asking them to maybe do a little grading trim [1:20:48] back of vegetation Etc um that is certainly something that should be [1:20:53] considered given what what has happened this summer with the the number of [1:20:57] crashes in just the historic crash rate here yes just a couple quick thoughts [1:21:05] um you're going to do the bike path all along um in the road width changing [1:21:13] travel L doesn't that have to be done also in conjunction with Killington and [1:21:19] R to and I guess I'd be afraid coming to [1:21:23] rton town I don't know what the width is but let's just say it's the 14 ft or 15 [1:21:27] ft and all of a sudden it goes to 11 ft um in the same way on the Kellington and [1:21:34] um and also on the M you know which is in the you know is now the [1:21:41] breakdown um seems to me some continuation you know through that [1:21:47] Corridor um people don't know where the to lines are true it's not that in [1:21:53] regards to the safety question if we're going to make changes to the road that [1:21:58] is the time you know there needs to be a turning lanane or I mean and I guess [1:22:04] none of us know where the traffic would be in and out of the new um Federal [1:22:08] Building um in Germany's end has been a issue for a while sure without a doubt [1:22:17] um as far as the question about as you change jurisdictions you are right it [1:22:21] can be you know it the the cyclist especially if all of a sudden the [1:22:26] shoulder just becomes a shoulder and they don't have that protection anymore [1:22:29] that is jarring but as was pointed out hillington is looking at their own trail [1:22:35] connection study and they're looking at in there and again downtown because [1:22:39] they're in a similar situation they don't have much of a presence they're [1:22:43] trying to build that by moving their town office and doing some of the same [1:22:47] things we're talking about here defining edges a little better access control um [1:22:51] so there's a number of things killing is thinking about doing and so it is the [1:22:55] the only way you end up with a sidewalk Network in a city is when someone buils [1:22:59] that first sidewalk it might go to nowhere but eventually if everybody you [1:23:02] know builds that sidewalk and I think that's what you know you would be trying [1:23:06] to do here now the Alternatives I presented was trying to figure out where [1:23:11] the those key destinations are currently or proposed um and so which is why I [1:23:17] left that middle segment out but you're right if that is something that is [1:23:20] really important to the town then then that can be the preferred [1:23:25] alternative um but I I just looking at it from an analysis point of view um [1:23:32] think it's more appropriate to think I'm connecting this recreational destination [1:23:36] to this recreational destination or I'm doing it in the village um but you know [1:23:42] again this is you know what what your preferences are and it's time to have [1:23:46] those discussions but I wouldn't be afraid of doing something that slows the [1:23:51] traffic here especially in your village District because that's what you want to [1:23:54] do and even along the whole quor the the quor is currently driven at about 60 [1:23:59] miles an hour in the segments and that's not what we want so what what we have [1:24:04] isn't working and if we want it to change we have to start thinking how we [1:24:08] can engineer it to change just for a little history I'm [1:24:13] Ellen prior live on JY and my husband retired state police and he identified [1:24:19] that coming down down when we have to turn Journey's [1:24:23] End that could there potentially be better signage because if because trucks [1:24:29] like sail down you either have to keep going down the mountain or risk your [1:24:35] life so we went to VR and they took some time and they came back and they told [1:24:42] him that there wasn't enough statistics my husband was thinking public safety [1:24:47] prevention and apparently they're wereing enough deaths for them to [1:24:52] consider just doing a little a bit more signage there you know and it was very [1:24:59] similar to ' 89 when there was no Rumble strap I couldn't tell you how many times [1:25:04] I talked with the commissioner of Public Safety about the amount of deaths and it [1:25:09] wasn't until the family of five got killed that they put Rumble strip in so [1:25:15] if you think prevention it doesn't seem to be um doesn't seem to be accepted [1:25:22] because I understand about data and all that kind of stuff but that was um the [1:25:28] response that he got and he's a guy that gave 28 years of his life to Public [1:25:33] Safety all in the state he also drove North on 100 to go to Waterberry for the [1:25:41] State Police he then got Rockingham and drove South and the bikers it's [1:25:47] unbelievable his suggestion was if the state is going to adjust the high way [1:25:52] for bikers then there should be a license fee and accountability and [1:26:00] then it comes to the what is the price and who's going to do the law [1:26:03] enforcement so I just wanted to input that because it's not a new issue and [1:26:09] there has been it's been addressed and so I got you know how [1:26:16] I a nurse working in ICU how many head injuries how how many spinal cord [1:26:23] injuries do you have to see on a highway in order to I mean what what's the [1:26:28] number you're looking for for the statistics I'm just curious you know had [1:26:32] three yeah they're very high summer believeing I understand and it's right [1:26:36] but you know the warded world kind of thing and and there's so many in factors [1:26:40] right I mean but I will point out to you um the [1:26:45] safety um climate at P has changed significantly in recent years they are [1:26:51] taking be a much more systemic approach because the fatalities that are [1:26:56] occurring are more on Rural roads they are people leaving the road they um and [1:27:02] they're aware of this and because those types of crashes tend to be one crash at [1:27:06] a location the statistics and don't bear it out but what the statistics tell us [1:27:11] is on certain types of Roads there are more fatalities ER is trying to take a [1:27:17] more proactive approach and so it might be a better time to ask that question [1:27:22] and look for for some support information you don't need to [1:27:27] always this is a new beginning yes is fabulous yes you know but and I do [1:27:31] compliment um I'm sure that someone in our town contact City and as you go out [1:27:37] the Dr on a road all of that Landscaping has been totally cleared and that is [1:27:44] like a blessing right and it's was such a practical thing I mean my initially we [1:27:49] had our our road people and not our road people our residents on a road we took [1:27:55] out our our instruments and went down there to try to cut it lower but then [1:28:00] there was one area that was a landowner right by the house there um to the left [1:28:05] and that was a different property line so you know but however I compliment the [1:28:11] work that has been done and I appreciate the work that's in the [1:28:16] future for sure those of all of us who live in men didn't have can count [1:28:21] numerous near misses yeah but that's not quite the statistic yet but how many [1:28:26] times pulling good point it's probably good [1:28:30] time to revisit it especially after this summer we were talking about I mean I [1:28:35] like some of your suggestions I think they're great but low in speed Li would [1:28:40] take people go slower I mean it's pretty basic the statistics actually don't show [1:28:45] that though people drive how they feel comfortable driving I understand but [1:28:49] when you're in the 45 mph Zone you're doing 50 when you're in that 50 mph Zone [1:28:53] you're doing 60 that's the I mean I'm outs stop my store all day I see how [1:28:57] many people flying by day definitely I mean I two people Buy FR of the store [1:29:01] this year um it's a dangerous road I if you think [1:29:06] of putting bike pads and people on the side and then you're going to tighten [1:29:09] the lane one little mistake you're killing people on that road at that [1:29:13] speed right but the idea is to engineer it so that the driver drives it [1:29:18] differently where we want to engineer the solution to get the speeds go down [1:29:22] even at 50 mes an hour if you're going to have bikers and hikers walking by [1:29:26] it's dangerous that's dangerous even at 50 yeah but they didn't see if you're [1:29:31] talking about the shoulder alternative I mean the fact of the matter is there is [1:29:34] some carless population there are some people who are waiting for that bus or [1:29:38] who are out there biking currently the um Killington pipo place because they [1:29:42] have you know some of the um sh people in there that's a big bus stop over [1:29:46] there too but um I just want everyone to know in town There's squatters going [1:29:51] around so be careful if you have a vacated building put up a [1:29:54] no tresp passing sign on it so the cops could do St about it the ti roll was [1:29:58] loaded with they were renting it out we got rid of them for now but I think [1:30:02] they're in back building though just give you the heads up I noticed them [1:30:06] because they were on the bus stop [1:30:10] imag can I ask the question is U so is lowering the speed limit off the table [1:30:15] or yeah lowering the speed limit is is not typically done because all you do by [1:30:22] lowering the speed limit is you know provide law enforcement with a way to [1:30:25] write more tickets it very rarely actually low the travel speed on [1:30:31] roadway so and that's been proven in mendan so we um we have been dedicated [1:30:37] for the last 20 years of trying to slow um traffic down on Route 4 by [1:30:43] policing it and it hasn't worked at we all know it has it works I understand [1:30:47] that um and so visually we have to get inside the brains of the drivers and see [1:30:53] what it's like how to calm how to calm the traffic so that it doesn't feel like [1:30:58] they're driving a freeway we all drive on that road when you're in that 45 M [1:31:02] hour Zone you're not doing 60 miles hour right but even if it's wide or skinny [1:31:09] whatever because you're so afraid of the ticket if you go to the 50 mile Zone you [1:31:14] think nothing doing 60 65 M hour aring with you the reason in the 45 M hour [1:31:20] Zone you drop lower is the houses are closer to the road there's mailboxes [1:31:25] right there the lanes are narrower business is a 40 coming up the [1:31:30] hill then you're at 50 again I know but I'm saying it it really is you know the [1:31:37] character in The Village district is different and that is why you're driving [1:31:41] it differently you you are going 60 miles an hour through hillington that's [1:31:46] actually what the data shows and it is because it is you're not not at the [1:31:50] bottom when you come down the 40 m but when you go through Bridgewater you [1:31:55] get to Bridgewater and the houses start to get closer to the road and no you [1:32:00] don't want to go 25 through there but you do not want to go 60 through there [1:32:04] you you well usually there's a cop right I mean the sign that you put up [1:32:11] was great but um it should have been written a little differently saying you [1:32:14] know radar strictly enforced on this Ro slow down it's pretty much basic thing [1:32:18] they had some weird sayings on it that you didn't understand what the hell [1:32:21] saying and that's speed trans yeah Alternatives because we do tonight [1:32:28] want to out of this with the direction for [1:32:30] Alternatives changing the speed limit is beyond this the control here um what we [1:32:36] can do though is potentially set you up with prer alternative that is buildable [1:32:41] and could make some change so if you were to create a [1:32:46] situation where the atmosphere or however you want to call conditions [1:32:49] suggest you go slower um would the speed limit ever get lower [1:32:55] in that case yes okay so they they speed they set the speed limit based on the [1:33:01] 85th percentile speed it's the speed limit is set by how drivers feel like [1:33:08] they should travel or by density so in some communities where it's very very [1:33:13] dense the speed limit changes or if you're in the school zone there's [1:33:17] certain locations where even if you feel like you could drive faster they say no [1:33:21] should drive slower but if the road is designed to accommodate a fast speed [1:33:26] that is how the speed limit is set is by how you're driving [1:33:30] it I have two two things uh one is uh uh live on Woodard Road which is directly [1:33:37] opposite the entrance to the new forestry headquarters which is [1:33:42] beautiful but it's directly across and coming upill there are two lanes going [1:33:46] downhill there's only one um those of us who live there and experience [1:33:52] turning onto Route four in various conditions are very concerned that [1:33:58] there's going to be a problem once that once both things are open if you're [1:34:02] coming downhill and you want to turn right that would be one thing if you're [1:34:05] coming downhill you want to turn left onto wooded Road and you have a whole [1:34:09] bunch of skiers behind you and there's no uh way to tell people that this is [1:34:15] now a a major essentially an intersection at the very least there [1:34:19] should be signage at the very least there should be I don't know flashing [1:34:22] yellow light but I really would recommend that you that in terms of [1:34:26] intersections you look very carefully at that because so far all we've had our [1:34:30] construction trucks moving in there while they're building it but and I [1:34:33] don't know how much traffic and uh there will be once it's open but it's it's a [1:34:39] potential dangerous place so you might have kids over there that is a safety [1:34:45] concern um as as far as an intersection and could be a part of our s to be trans [1:34:51] when you're looking looking at safety looking at signing in advance for that [1:34:55] but again not not anything that I can do with the scope of this study um I'd be [1:35:01] happy to run through the Alternatives again to remind folks of what it is [1:35:05] we're really talking about tonight and what is within the control of the study [1:35:08] sure go ahead um I'm hearing a lot of the same concerns and to bring it back [1:35:15] to what you're talking about my suggestion would be alternative three [1:35:21] through through the entire stretch because we are narrowing the [1:35:25] lanes we are slowing vehicles and we're providing a space for pedestrians that [1:35:31] has a buffer cell that addresses the concerns of if we only lower the speed [1:35:36] so much by this constrained environment do we really want pedestrians that close [1:35:40] to Vehicles so if you're looking for opinions on what to do there's been [1:35:46] several comments online too about having a path separated from Road as the prefer [1:35:50] alternative okay great anybody else again I'm happy to [1:35:54] run through the Alternatives if you want to see an image of them again um I don't [1:35:59] think I've heard from folks on the side I was gonna say this is also an [1:36:04] opportunity for men to make more menend more desirable in the different ways [1:36:09] that we would like to make it more desirable in the can't I me everyone but [1:36:13] there's you know I think for many of us we kind of love the fact that we're pass [1:36:17] through town like there's not too much going on but at the same time it would [1:36:22] be nice if there's a little bit like gentler Lifestyle on Route four and it [1:36:28] wasn't so hyper and and and everything and then also that could in my mind [1:36:34] produce an environment where people do want to come in either ourselves or [1:36:38] other people want to come in and um we have the properties that aren't being [1:36:44] utilized and create more businesses and make men a bit more of um destination [1:36:50] than it has been then so that the more we do to beautify [1:36:55] and slow down and give access to as many make it as inclusive as possible then we [1:37:01] could have more desirability for things to [1:37:10] happen was up sure um I I'm my name is cat I'm coming from py I'm mostly here [1:37:17] to listen but also a bike mechanic and so tons of folks in my community are [1:37:23] going up and down that road all the time um I am curious just from research [1:37:29] perspective why ballards or any type of barriers the height of a car um haven't [1:37:38] been proposed as an in between as as a a solution that is cheaper than um than [1:37:46] alternative three but um perhaps more like visually safe than alternative [1:37:55] one and also gives drivers a little bit more [1:38:00] fear of damage to their vehicles yeah typically um that is a [1:38:07] feature that is used in a more urban setting where speeds are lower sure um [1:38:12] at a location like this um it it isn't that typical and part of the issue is [1:38:17] the maintenance of that because they do even inter up in setting they get struck [1:38:22] and need to be replaced and they create a a challenge for Paving and how they [1:38:27] are attached to the pavement in some cases reduces the life cycle of the [1:38:33] pavement so there is definitely a few things that make it a less desirable [1:38:37] alternative here you would it would help to Define that kind of idea to make the [1:38:43] car feel a little more constrained and that visual um line between the car and [1:38:50] the the cyclist um but it isn't something that is typically used in a [1:38:54] setting ties plowing would also be oh [1:38:59] plowing the winter anyone hav't heard oh I wanted [1:39:06] just address the the uh not any particular segment but the just that the [1:39:13] road have continuity as it goes through mending so that the surface is going to [1:39:20] be clean and smooth the cyclist because there are [1:39:26] any cyclist who is interested in going all the way to killing to Killington uh [1:39:33] is going to be looking for a clean smooth surface uh not any segments with [1:39:39] with gravel because it's just going to slow that person down and take energy [1:39:44] and and um and also people who commute to any place work along that uh in in [1:39:53] mending or along the road are going I'm not interested in you know um doing it [1:40:00] for fun of it uh they have to do it and they're looking for the same safety [1:40:04] features as well as the same um ease of pedaling and the safety of [1:40:14] pedal and on just oh one more thing and the there would be the recreational [1:40:20] cycle who um may be thinking about well I want [1:40:25] to ride up to wheelerville ride up the wheel of a road [1:40:30] and do some gravel and that's a very attractive rout but the safety factor is [1:40:37] a critical Factor keeping almost every cyclist that I know [1:40:43] from doing it right now so in improving mening in in route four um the more [1:40:51] that is done the more attractive that you know riding on L is [1:40:56] going to become as an objective to get into other places and [1:41:01] bend so it does sound like I'm hearing some support for a shared use path [1:41:07] alternative um do we have a feeling for whether it it on the North side or on [1:41:13] the South Side makes the most sense I would say there's some arguments for [1:41:18] either um on the north side is where the forest headquarters is um on the South [1:41:27] Side um is willville road as you just pointed out I mean there are certainly [1:41:31] some destinations on either um does one stand out to this group is I think you [1:41:37] have less buildings on your North Side than you do on the South Side I [1:41:44] believe I'm not sure if I've counted the buildings but I think as far as [1:41:48] resources are concerned I think the north side was a little bit better a [1:41:54] little fewer fewer Crossings but um but you know does that help you get to [1:42:00] destinations um and one of the things that we didn't get into is is the [1:42:04] challenge that we have with Crossings in that high-speed environment um VR will [1:42:11] not put in a crosswalk on a 50 m per hour road because what they don't want [1:42:15] to do is encourage you to feel safe Crossing W you know crossing a crosswalk [1:42:23] you feel like someone thinks it's okay for you to do so whereas their policy is [1:42:28] you're if you're making that choice they want you to know you're making that [1:42:30] choice they're not encouraging you to cross at any particular location is [1:42:35] there a certain speed that they call Smoke safety or is it [1:42:41] 45 it's the maximum speed is 40 miles per hour but even then it has to be on [1:42:46] like a non us Road as well Road yeah so so one of the things that we could talk [1:42:54] about and this is really just you know at strategic locations is there are um [1:43:00] great separated Crossings for the Long Trail and the appalation trail at other [1:43:04] locations and um that is something that could be considered whether it is by [1:43:11] doing it in effect think of it like through a culvert underneath the road or [1:43:15] whether it is by doing it via a bridge over the road now there is a significant [1:43:19] cost associated with that um and I don't know you know if something like that [1:43:25] makes sense but I just you know wanted to touch on the crossing because we [1:43:30] would likely be looking at a shared use path situation either on the North side [1:43:33] or the South side and you would still have some destinations and people on [1:43:37] both sides that want have a question online Mary had her hand [1:43:45] raised Mary do you have a question hi um so I live in Rutland town [1:43:53] and Northwood Park is very OHS the mute symbolism up can you hear [1:44:01] me uh uh do you w to ask Elizabeth if she [1:44:07] can hear her can anyone hear me Elizabeth can you [1:44:11] hear Mary yes I can hear [1:44:18] her so that's be our end okay so could you translate for me [1:44:25] um in the meantime while we try to figure out what the sound issue is maybe [1:44:29] Elizabeth can attempt to answer your question Mary but if not I can try to [1:44:32] get back to you after the meeting oh I was just gonna say um Northwood Park is [1:44:37] on the North side so a reason there's biking hiking [1:44:43] pool the and turn on one of our speakers on our laptops that are [1:44:48] connected that way we don't get feedback [1:44:56] in the room yep they won't [1:45:06] here try again Mary oh can you hear me now yes oh okay [1:45:13] great sorry um so I was just saying that Northwood Park is very close to the [1:45:18] menden border and there's um hiking and uh mountain bike trails [1:45:24] and the pool and sports and um so the north side of the road would be closer [1:45:30] to that too that's all I was trying to share [1:45:34] thank you great thank you thank [1:45:40] you the way it needs to be can you okay perfect go ahead so does anybody know [1:45:45] where the Valmont Trail is going to come through is it coming through men because [1:45:50] be another I mean that's going be probably hugely [1:45:55] popular proposed Trail is GNA have a connection to the forest service [1:45:59] building be on the North side there and then also go near the Northwood Park [1:46:03] it's going to connect to um Park Lane and post are that could a lot of tra [1:46:13] tremendous right now there's very little p death SC in replac traffic after dark [1:46:18] I'm guessing it multi Ed path shared Ed Pathways go in that that usage goes up [1:46:24] because people feel comfortable again are we're a shared Ed pathway across [1:46:29] existing intersections is our lighting currently sufficient if there is [1:46:33] increased use after dark winter whatever [1:46:41] Allway anticipating some well depending on where we are so [1:46:47] if we're in the village District your locations tend to have lighting there [1:46:51] would be a further evaluation if that lighting need to be supplemented or [1:46:54] modified to make sure that it captured where the sh New Path was crossing um [1:47:00] but there aren't that many Road you know public roads that it that it's Crossing [1:47:06] so I don't think that that would be a detriment putting in that share use path [1:47:10] in a more rural environment um you know I there would likely not be lighting out [1:47:17] on the shared use path unless it did come in by an intersection and if you're [1:47:21] going to have it at a point where there is more vehicular conflict then then yes [1:47:27] possibly but that would certainly be evaluated during [1:47:32] design there was also a question online about um if there's a certain incline [1:47:38] that could deter use of a multi-use path like is it actually a real world um [1:47:43] scenario that a path would be usable on the root for corridor [1:47:48] which I I would say for me personally most [1:47:53] definit but I see people cycling up to the you know up to the The Hub like all [1:48:01] the time it is amazing to me so although yes most of us may say there would be no [1:48:07] way I would do that middle segment on my bike there are certainly plenty of [1:48:11] people and those are those Recreation enthusiasts that that I think men is [1:48:15] trying to attract um so might get less use than some the other segment [1:48:21] certainly um but there will be some for sure I would also say that [1:48:27] to a lot of people riding up there one electric bikes keep going to kill [1:48:31] anything from Roll stuff like that I not t but there the other one stop the store [1:48:37] they need water yeah and the concept if build it they [1:48:43] will come so so I guess why don't I ask this this group up a couple of key [1:48:48] things it sounds like I'm hearing a coalescing along providing a shared use [1:48:53] path really throughout vending from from end to end is there anyone who does not [1:48:57] think that's an appropriate um approach or the alternative is that [1:49:02] the most expensive one or was that [1:49:07] the i i my personal opinion is to implement it easily in see how it's [1:49:12] working instead of dumping a ton of money and it doesn't work at all that's [1:49:16] my opinion well one of the things we could talk about is sp if you could like [1:49:19] use part of that money started phase one phase two works out you know spread it [1:49:24] out so there could be a phased approach where you look at in the village where [1:49:29] it's probably most appropriate where you're going to get more pedestrians and [1:49:32] more cyclists um and in connection with that talk about the restriping and so [1:49:38] maybe the phase one grant that you pursue includes those two pieces and [1:49:43] then so at least the striping has happened to provide some protection and [1:49:48] a sh's path of a limited segment is is implemented um because of course you [1:49:53] know there are the funding there are limits to funding and so maybe then you [1:49:57] have in future phases then to continue to to move the um the shared use path [1:50:03] which I would suggest if you were doing a three-phase project you really think [1:50:06] about them phase two being that other P end where we think we would get more [1:50:11] usage because you do have to be competitive in your application as well [1:50:15] you have to be able to to show why you think that people are going to use this [1:50:18] investment if you're going for the big money I don't know if you can go for the [1:50:22] tip Pro the tip is what killington's doing they're eating up a lot of the [1:50:26] money they're not we're not paying the money you know what I'm saying I mean [1:50:29] there's money the issue is you have to entice [1:50:33] the businesses and because unfortunately on that for corridor in recent years [1:50:38] it's you know the restaurants have gone out the hotels have gone out there PR [1:50:42] Bas 45 M hour z in business the 50 [1:50:47] m basic you're not you're not wrong but it is tough to generate money with the [1:50:53] Tiff District if you don't have the business coming in that's Pro make sense [1:51:00] is pay so that's the other part of this [1:51:04] that I just want everybody to be aware of that you're you're looking at a very [1:51:08] large project on and mendan has a very small budget so um annual budget so we [1:51:15] spend a little over a million dollars to run the entire town for a year annual [1:51:21] operation and right now we don't plow any sidewalks so we don't have equipment [1:51:28] to plow sidewalks um or a shared youth path so that is all continued [1:51:33] maintenance is also a piece of this as we go forward because there's only 1100 [1:51:40] property or 1100 people in Menan and 850 Parcels paying those taxes so we have a [1:51:48] middle of the road suggestion here which is Lane striping which is a lower cost [1:51:54] and that way VR continues to plow the whole Road um the straping is a cost and [1:52:00] that's a a that's going to be an annual cost by annual cost that you have to [1:52:06] restrike um but the maintenance is greatly reduced from that' be big [1:52:13] maintenance if you ran you know share Trail all the way from you know there to [1:52:16] Killington you told us you know that's s doing sidewalk and Killington with the [1:52:21] little thing well what we've typically seen is [1:52:25] with a shared juice path as you do it with full ploud I mean you don't use [1:52:29] just a sidewalk so if you were to go with a full shared use path you would do [1:52:32] it you know with a full plow driving down [1:52:36] to J I mean this is V transis road so do they uh take responsibility for any of [1:52:44] the costs associated with restriping or is that so there's a couple ways that [1:52:50] can move forward one is to include that in a Grant application but another is to [1:52:56] talk to VR about when next they're doing full striping and whether there is the [1:53:01] ability to modify it and um come up with what that plan should look like for for [1:53:06] how that should be striped and if they're amenable to that and the best [1:53:09] time to do that is really when they're going to put another course pavement [1:53:12] down and I don't know when that is and we can certainly look into that when [1:53:16] that targeted to be done um for every 10 years and I feel like it's been roughly [1:53:23] that time since the last there so there going be an opportunity soon to to [1:53:28] incorporate that and then you could think about whether there's other things [1:53:32] such as you know the crosswalks or a sh's path or something else to pursue [1:53:36] through grant funding for a longer term solution what's your approval process [1:53:41] like if we wanted to go forward with like the alternative [1:53:46] one is there are there studies that you have to provide to be trans [1:53:50] yeah so what ends up coming out of this is so we've already done kind of an [1:53:53] existing conditions assessment and um you know we're following the steps [1:53:57] associated with the granch um process and from this meeting if we come up with [1:54:03] what the planned approach is and it could be a shortterm approach with [1:54:08] followed by a longer term approach um ultimately then we provide this to be [1:54:12] trans so we met with them because it is their Road and got some input as to what [1:54:15] alternatives we should or shouldn't talk about and I say that kind Loosely [1:54:20] because there was nothing that they said don't talk about but they did say things [1:54:24] like me trying to get rid of the climbing Lane they said that's a real [1:54:27] long like be honest with them that's a really longer term solution that's not [1:54:32] it's not at the table but that's not something that we're going to want to [1:54:35] move forward with the short term so they were up front with us they knew what we [1:54:39] would be presenting today um and basically you know what happens next is [1:54:47] yeah if it's striping recommendation it could become part of their work plan and [1:54:51] or if there's something else whether it's striping or whether it's you know [1:54:54] putting in a sidewalk or shareed use path the grant program and [1:54:57] transportation Alternatives Grant or the bike pad Grant or the way to help [1:55:01] those so if the town collaborates with say you know you're going down for take [1:55:07] par you're going over North you have this B Trail that's going to be um uh [1:55:13] it's it's a reality and so then you go down or you take a less online Road [1:55:20] they've just researched it all there's there are several several walkers on [1:55:25] that road and also they're in bikers and they come up from Kellington Avenue over [1:55:31] that way and you know as you know highways uh it's [1:55:37] enticing to go faster right so it those folks are in Jeopardy so and that's [1:55:41] where on toown so you're looking you have great money and you are showing on [1:55:48] your whatever phase you want how you want to do that that you're [1:55:52] collaborating with um the Park Service which is which is National and they have [1:55:58] more finances than we do and and you're also working you're in mendin and [1:56:03] showing the collaboration to get over there using existing [1:56:08] resources you know I I concur 150% on the village [1:56:14] aspect and how how that goes because it's very imperative for our town for [1:56:20] that um so does that give you any leverage in regards to collaboration [1:56:26] versus just doing what you giv you a much more palatable Grant application [1:56:32] because that the bip grants are competitive and so to be able to say [1:56:36] you're working with surrounding communities to create entire network and [1:56:40] or that you know the forest service is putting this in we know these are new [1:56:44] connections that can be made to different Trails um that makes your [1:56:48] Grant application it isn't just a standalone facility in the middle of [1:56:52] nowhere it's part of a network go more Global yes definitely that that makes it [1:56:58] more I'm kind of new to this uh table but I was just wondering has has a [1:57:04] rotland town have we had meetings that um you know you're doing this and we're [1:57:10] looking to do this how can we improve the you know coming down forward taking [1:57:15] the left you know and I understand they're doing it at the Post Road course [1:57:19] there school section over there and theyve done a really nice job you know [1:57:23] with that my son used to like he an interpretation he go out of J one day [1:57:30] momy says mom can't I just like go to north of pool today I said really you [1:57:35] think you're GNA like drive your bike down the [1:57:38] FL so okay I said well why don't you let's try it so we had our supper [1:57:44] daylight so traffic I'm like following down there and I'm thinking I'm not [1:57:50] ready for this I don't think this is going to work but it they have enticing [1:57:54] you know um the kids have a really good time it's a lot of fun kids are doing [1:57:59] Mountain Bing which is excellent Wellness you know but I just wondered [1:58:04] how can we um collaborate and you know be able [1:58:09] to kind of make it like I mean you've got the government you got the state you [1:58:14] got rot in City over here you got rot in town you know it seems like we should be [1:58:19] able to do that and enrich all the communities the other thing in regard [1:58:23] signage a lot of [1:58:34] towns veterans and having you know having that signage that kind of [1:58:40] Embraces the veterans who um I respect highly um to have that in [1:58:48] my town um which is not in the state but I noticed when I go with seven you know [1:58:54] they have you know who serves where Co is yeah and any of those any either [1:59:01] monumentation or as I said banners or other things really helps with the plac [1:59:05] making so I mean that is definitely something to embrace to help you feel [1:59:10] like you're arriving in a place the is from you know doing that again not not a [1:59:18] part of this so right now but why don't we just take a step back because you [1:59:23] know I I know folks are are going to want to go home at some point why don't [1:59:27] we just talk a little bit I heard a lot of interest in the Shar pad you brought [1:59:33] a great point up though that menen will need to maintain that shared use path um [1:59:39] and that is something that we need that honestly if you apply for that Grant you [1:59:44] you have to commit that you're going to maintain that share juuse path um is [1:59:48] there a short-term solution that folks what you know what is the appetite is it [1:59:57] um all in we we want the shy path the entire way is there a in the shorter [2:00:04] time thinking about segments with just the the striping is there um and we do [2:00:12] really need to find out like as towns people that would mean if there is a [2:00:16] change to the budget at town meeting day all of you who are interested in the [2:00:21] shareed use P need to get out there and make sure that the town's people are [2:00:25] going to vote in support of maintaining that sh and you know grants come with [2:00:30] matching funds so we would have to have matching funds in order to construct [2:00:36] this that is true it seems like that's the only [2:00:40] alternative that leverages the other other communities assets and resources [2:00:45] right otherwise we could accomplish traic down [2:00:50] nice right but is there reason to stop and right now but I think you have the B [2:00:57] which is definitely going to create a lot of traffic right if you if you can [2:01:01] connect that because I mean I don't really know [2:01:05] how many people got to walk up for hillington I have two people come the [2:01:11] store year maybe yeah you know what I'm saying but it's [2:01:16] not a large amount because that's air roide [2:01:19] up that I mean usually it's schools and they're just torturing the kids well [2:01:23] it's a high level enus this very little road riding for [2:01:28] month about and then of course the eik will change terms of [2:01:32] community but so my point would be like if you get to to the new farest uh us [2:01:38] farest service right where the Belmont Trail will will be right connect that [2:01:43] the people that will use Almont and then connect that to the resources in R right [2:01:49] right and then connect that to men at least right [2:01:52] so uh cuz I mean I think you need to leverage everybody else's resources [2:01:57] because I don't see a lot of resources in menend in to drive people I mean you [2:02:01] have like trigger spice which is cool right people would like that and you [2:02:04] have the Min golf right ice but um my suggest would be at least to get [2:02:11] that multi-use pass up to the for Center or service center start from the and go [2:02:17] up to the right because then you can engage well first of you'll get people [2:02:21] to come from the for service that use mul to come down from men right and then [2:02:26] they go over to R for those resources right um I'm sorry stuff on Park the [2:02:31] swimming pool and stuff like thats and going to go that way you said [2:02:36] yeah yeah so I think that then you could capture some of that distance right that [2:02:40] audience anyway and then because I think pass there multiuse pass [2:02:47] PA not get resear what kind of Ro like you said [2:02:53] you were deal with killing coming the other way you know what I mean you have [2:02:56] to get connect you know yeah that sidewalk to Nowhere you know it's just [2:03:01] in the middle but I think I think if they're Killington they're [2:03:06] they're might be into it to the people who would be who might be [2:03:12] visiting B would probably do so on FMA Trail because otherwise they would be [2:03:16] doing it right now on new porn they're not [2:03:19] so so I think develon is attraction is a is a resource rather try to leverage and [2:03:26] uh I think it's you know in terms of the cost so you're not going all the way up [2:03:29] you go to there the part service right and then um and that's up marketable as [2:03:35] well connect you can Market that so you connect men to the trail to the m of [2:03:42] course we and then you know the the r can you [2:03:48] know Hill Park and those other resources as well so that my my suggestion would [2:03:53] be that that would be a good thing to do to get that multi-use trail at least up [2:03:58] to the part service um because then it becomes sort of a marketable asset as [2:04:03] well hey this is what you do is who we are is where we are we're local we're [2:04:07] close right you're going to ride building thing come on down we have [2:04:10] rooms meals you know so my suggestion yeah I have a quick question for the [2:04:16] town the setbacks over there are 100 fet corre [2:04:21] correct is there any I mean you guys are trying to tighten up the road and bring [2:04:25] the house to closure you can't do it but is there any chance that the town might [2:04:29] up some regulations on that in future building so that would be in the zoning [2:04:34] re so as the Planning Commission applies for a municipal planning Grant this year [2:04:39] they'll start working on the zoning regulation rewrite for going into [2:04:45] 2024 and those are the different ideas that you want to present to the Planning [2:04:50] Commission to possibly reduce that setback oretty extreme setb really you [2:04:57] look at it I mean 100 feet yeah you know yeah so the [2:05:03] intention between you know the intention there was to have green space between [2:05:07] the buildings and to keep that rural aspect but what hasn't happened is they [2:05:14] built out route four so wide that now it's just a if you want business to come [2:05:19] in and I'm going to H on it again Lower speed limits they come in on but you'd [2:05:24] rather be closer to the road because if you build a building there you're 100 [2:05:28] feet you got to build a building 100 feet back have a tiny sign and the [2:05:32] parking lot pretty much has got to be in the back of your store which is very [2:05:35] rough for a business to open up I mean by changing that might make your car a [2:05:39] little better I don't know just a suggestion [2:05:43] W was there reaction to the proposal of a shared Ed path from w Town Line to the [2:05:49] forest service is that um appealing do we think [2:05:55] that's more practical than the entire Lane do we think we lose something by [2:05:59] dropping the East end or do we think that that sounds appropriate I think [2:06:03] you'd lose something but you're going to sounds like you're going to gain more [2:06:06] because like the people have been saying there's more cyclists they will be [2:06:11] interested in that you can connect in the future too [2:06:17] yeah yeah otherwise who you're who are you trying to [2:06:21] attract practical side of do it worth it yeah yeah and and they come where they [2:06:28] where they G [2:06:33] they striping and maybe something in the village to start and then that next [2:06:38] segment of the path be like a phase two feel like it's a lot well maybe you can [2:06:43] make a combo too you're doing the pass that way and then you have the striping [2:06:47] going up the rest of the way you know there's different theories can go with [2:06:50] this so what do you do to narrow the road where you don't have the the path [2:06:55] anymore make it less well I me as I showed in striping [2:07:00] that that for alternative one in each configuration and you know you can see [2:07:05] it on your screen now um is using that same 20 fet in a different way to make [2:07:11] the driver feel like they're more [2:07:17] constraint I have a question Clarity question how La a process are we talking [2:07:24] about that may be a hard thing to answer and it depends it depends how successful [2:07:28] you are in your Grant applications um because I did a scoping study in um [2:07:34] theas swon a few years ago and let me think it's now three years ago now we [2:07:41] are designing the first phase of their improvements so they were successful in [2:07:45] obtaining you know in the first round with their grant program after because [2:07:49] of course this still has to continue through the process um when once we come [2:07:52] up with a bird alternative and create a draft scoping study po to V and VR is [2:07:58] review of all of their departments and that's where they say oh my gosh that's [2:08:02] going to be incredibly difficult because of that one like how are you going to [2:08:05] address that and can you comment on this or your estimate is too high because of [2:08:09] that and they they comment on all the different aspects of the study and then [2:08:13] ultimately it also needs to be endorsed by the select board um with the full [2:08:18] understanding what that means those implications about maintenance Etc um [2:08:22] after which point then you have this and then you look for those grant [2:08:25] opportunities that come up from be now there is currently right now the TR [2:08:29] Alternatives Grant is out there right now so we don't have the study but maybe [2:08:34] next year at this time you'll be in a position you could apply for that grant [2:08:37] for example um but you may not be successful in that first grant R so um [2:08:43] give a sense of what the cap on that Transportation Alternatives Grant is in [2:08:48] terms of um I am less familiar with the amounts and the transportation [2:08:53] Alternatives Grant the bike P Frant I have seen that for projects anywhere [2:08:59] from very very small to um I think 1.5 million for shareed use path or you know [2:09:06] something along that line and those are just some of the ones [2:09:11] I'm aware of it's not I don't know the whole list of all those supports I just [2:09:15] wanted folks to get a sense of you know is there any liability towards the town [2:09:20] when you're building all this stuff and these people going and driving around [2:09:24] does the town have a liability towards that someone get skill or Hur on that [2:09:27] situation that is a great question that I don't know that I can answer fully it [2:09:32] is still within VR right of way they are still the owner but the town is [2:09:37] maintaining it so I think if there is an argument about how it's maintained that [2:09:43] to the risk then perhaps I don't [2:09:49] either but it doesn't fall under that personal [2:09:52] liability [2:09:57] law yeah I'm sorry Thinking Out Loud [2:10:06] ask so are we looking [2:10:11] for res I mean resol I mean I'm Hing to come from this [2:10:16] with some direction as to I'm going to go back and draw up and look at imp pass [2:10:20] up um and so I've definitely heard support for a path on the north side of [2:10:26] the street um a phased approach that involves you know striping to try to um [2:10:32] get us some of this um it sounds like the the the sh's path on the North side [2:10:37] would extend probably from the Town Line to um the forest Service headquarters [2:10:43] ultimately it might need to be phased because again that is a big chunk of [2:10:47] distance um let me ask you about in in the [2:10:53] village for example in the village District um do we have an interest in [2:10:57] some of those crosswalks were the crosswalks I didn't identify are there [2:11:01] destinations that we want to think about Crossing pedestrians in the village you [2:11:06] have to go down to 40 miles an hour though um well I design it to be driven [2:11:11] at 40 miles an hour we could get there to get no I'm just you know saying [2:11:16] figure that y so is that where we want to lens do we want crosswalks I showed [2:11:21] them between sugar and spice and the mini bul and I showed another one down [2:11:27] between the Orchard and alen [2:11:31] pools it's dangerous though because get snow you get people going across that [2:11:36] road icy or something like people trying to stop you know they think you're going [2:11:39] to stop and you don't it's it's something you really to think about I'm [2:11:43] not against I think they're great but you know it's something to think about [2:11:47] you know people doing it no we'll evaluate that in consider with the [2:11:53] guidance you know because it isn't below 40 miles an hour currently is that a [2:11:58] part of the first phase I mean maybe we identify as that as the second phase [2:12:03] that happen if if we were to choose um the [2:12:09] striping hoping that the um speed would come down for the drivers just [2:12:15] visually I mean that by The Orchard that's that's a little [2:12:21] Rat Race sometimes [2:12:24] um would that come after that would there be some sort of [2:12:28] study well with a multiphase I we could identify that that's something like [2:12:33] evaluation of speed and crosswalk locations as part of phase two [2:12:38] yeah I'm definitely a fan of starting small cost effective seeing how see [2:12:46] effects and see what it does if it's going to be part of the project starting [2:12:50] off it's striping part of the project that you're going to go the two-way [2:12:53] start with the striping see where it goes and if it's start to be effective [2:12:56] and working then make you know you can go from there and I love the banner idea [2:13:02] it's cozy [2:13:05] um yeah let's to that so as we showed was just you the the down sign and just [2:13:14] put it on Banner um and obviously it's not scale it's very here but um yeah and [2:13:20] that the kind of treatment of thek slow people down and then we just grabbed a [2:13:27] few other examples um that we were aware [2:13:31] of I feel like the banner is probably the easiest and least expensive [2:13:38] alternative um because you do it behind the guard rail but it visually it is [2:13:42] still that vertical element um it does not have the impact of say a um sign [2:13:48] like Jericho mon sign and again given that area we know it is probably [2:13:55] difficult to plant and get Tre to thrive given there so as a result I think you [2:14:04] know steering fors theer and that sort of thing but we could think about [2:14:07] Advanced signage um think about um you know lighting periodic lighting as as [2:14:14] you are approaching into town and with the Lan striving to really reinforce the [2:14:19] drivers that you're entering I would think in terms of the crosswalks I can [2:14:23] see the need for between sugar and spice and the minol because that's two [2:14:28] attractions the I'm not sure how many people from Allen pools need to walk [2:14:33] over to the many orang plus there's A's a very sharp Hill at that point [2:14:41] it's yeah I guess I guess the question becomes if you are someone who is from [2:14:45] town and you live somewhere near there I mean do you just come for a walk here [2:14:49] and is there a place for you to cross if you need to cross so if you are coming [2:14:54] from the other end of men and you want to go to the coffee shop so you're on [2:14:58] the shareed 's path and you need to you cross to get [2:15:02] home so we can't NE like if you come off the Town Line Road and you're biking up [2:15:07] the hill and you want to go to depalo's we want them to cross [2:15:12] at wherever the location is and then proceed up on the other side of the road [2:15:18] it's not it's going from Allen engineering to to who's going from [2:15:22] Allen's to go get you know a muffin at at the orchard it's that's where you [2:15:29] would cross to get to the other side of the road to continue on to act so if you [2:15:35] wanted to go to Sugar and Spice you would cross there in order to go all the [2:15:39] way up Poss Network you got to have a crosswalk [2:15:44] that it needs to be significantly uphill from that very [2:15:50] right places [2:15:59] for frames it yeah it is a small cost though um the paint is really low cough [2:16:05] that's something that certainly you could include in the grant um I I would [2:16:09] agree it does help you better establish that [2:16:14] place thank you for coming but we do we agree that need to do something so we we [2:16:20] at least need to start taking an approach of the striping and the [2:16:24] narrowing and the yeah [2:16:32] so as much as I think like you know start with the end in mind yeah we can [2:16:37] do that but do it in phased approach and then maybe we get more um that of the [2:16:43] 800 tax properties maybe we get to 900 you know we see that we can do this and [2:16:50] then do the next phase and then you know to a th000 taxal well it's Redevelopment [2:16:55] of those properties on roof for bringing other businesses in and making a Vibrant [2:17:00] Community where we' plan to um and taking advantage of of parcels that we [2:17:06] already have and taking advantage of the less [2:17:11] verticalized part of the roadway right the parts of the roadway that are that [2:17:16] are more pedestrian friendly to begin with and grow it up and I don't mean to [2:17:22] leave anybody out but the some of the business owners were here in the more [2:17:26] flat area that to me makes sense to then work our way up and connect with [2:17:31] Killington as Kress and they're redoing their whole as [2:17:37] you said earlier G you know where the where the Welcome Center is and the town [2:17:41] offices like they're redoing their pedestrian and crossing and bikes up [2:17:45] there too so we'll have more information as sa for us and made and we haven't [2:17:51] talked about Rutland I think it's Rutland City [2:17:55] having the road diet yep so things are we are starting to get [2:18:01] there yeah there is definitely a push on any of these major arterials that belong [2:18:06] to be trans to to change the character when you're in the Village area for sure [2:18:12] I think from the perspective ofing committee [2:18:16] and [2:18:20] make all the applications the issue is what can we do now what can we do [2:18:24] relatively inexpensively like spring which may achiev the the kind of [2:18:29] unanimous impression we need to do whatever we can to reduce the speed and [2:18:34] maybe that will start to drive some Rehabilitation properties and so forth [2:18:38] while we think about longer term things like multi share path but I don't what I [2:18:46] kind of doubt this steering commit is going to be recommending and I doubt [2:18:50] that our select board is going to recommend is that we just make it easier [2:18:54] to get from Killington to R the city but that's not [2:18:58] our this project so while I'm but I'm offer increased bicycle [2:19:05] traffic and bont and so on so forth question the town's going to have to ask [2:19:09] itself is how does that help mended so is having a whole bunch of mountain [2:19:14] bikers coming from Rochester to findle park [2:19:17] don't do anything in our town except Traverse it and potentially on the [2:19:22] highway Le fality how does that help our town so while we have a regional thing [2:19:28] we want to accomplish we still have to from and perspective we still at what's [2:19:34] in it so that's [2:19:39] why striking issues trying to get the change custom change Behavior improve [2:19:45] property so I'm get [2:19:52] that would have to be voted on soon right yeah you know what I'm saying so [2:19:57] you know and I don't want to stret your speeding out any further right the [2:20:00] question is is that what is that give that you don't have got people slowing [2:20:04] down but what does that do I don't understand potentially let's say you [2:20:09] let's say demonstr time the striping slows the speed of now you can put in a [2:20:14] crosswalk because the state would say yeah justifi to rep put up a sign saying [2:20:19] 40 instead of 45 maybe they changed the signage instead of a flashing yell say [2:20:23] slow 45 flashing yell say congested District ah had slow 40 so well that in [2:20:31] the appearance of we are a town yeah um and not a drive-thru so people can slow [2:20:37] down and pull over at the gift shop and and notice it bu something that they [2:20:42] stop when they're going 65 a I'm not there [2:20:49] District ideally what you're trying to do is make it feel like a place so [2:20:52] people drive in a Fairmount slower and this it and then businesses find it more [2:20:57] appealing like that's that you want some of those businesses to invest to to re [2:21:03] to you know some of them that are business to become [2:21:08] business and don't I'm just you know don't think this the wrong way it but [2:21:13] I'm a businessman I just don't see like how slowing it down makes me want to [2:21:16] open a business there you understand what I'm saying that there has to be [2:21:19] some sort of I don't know you need to have some sort of draw you need a reason [2:21:25] right to stop so but but I'm saying this a bigger question right so but in the [2:21:30] meantime then yes I'm I'm all for the the the uh the moderate approach right [2:21:35] the engaged approach because um yeah I mean let's see how go money [2:21:41] right the question is though if it's grant money right you got to ma the [2:21:46] grant then you have to Main more [2:21:55] anyway online is anyone still with us online still online there a lot ofs and [2:22:03] the shies path and whatever treatment is done it should have actually be done [2:22:06] through theard or okay great did anyone online want to [2:22:11] verbally provide comment obviously [2:22:16] perfect shell yes oh yes hold on shell Rose is [2:22:23] is changing okay okay [2:22:27] good go ahead [2:22:34] shell do usound I think that was just feedback [2:22:40] from us oh unfortunately shelle we are having [2:22:45] trouble hearing from you [2:22:53] she no she's trying but no so Rose your volume is up and yeah [2:22:58] no can she type her question yeah I'm I'm so sorry sh if you want to type your [2:23:05] question happy [2:23:12] to [2:23:16] anything so I just wanted to ask one more thing [2:23:20] um you when you're uh setting out your findings um your report will you say [2:23:28] though there was large um desire to see you know a 10 year five year [2:23:36] whatever eight year 18 year whatever plan which Encompass the F and then but [2:23:43] the purposes of this think I I'm going to talk but I've [2:23:48] heard from some of the stiring committee and I look forward to Consulting with [2:23:53] all of them it sounds like the recommended long-term approach would be [2:23:57] with a goal of providing a shared use path through amended however we'd like [2:24:03] to do that in stages and we think in the short term the appropriate thing would [2:24:07] be to look at changing the way the road is striped to better accommodate [2:24:11] pedestrians and cyclists on the shoulder in a safer way but with then perhaps a [2:24:16] phase two or in combination with the phase one think of the chuse path in the [2:24:21] village where we expect there to be more demand for it and how it connects to up [2:24:25] to the Northwoods pool or you know other destinations in the village and within [2:24:31] later phases continuing to lead [2:24:36] up I think that's that's what I've heard today so is a member of the steering [2:24:42] committee so I I mean just been the interest of time because we've been at [2:24:45] this for two hours now um do you want to wrap up for the [2:24:49] steering committee like what the next steps are going to be because ultimately [2:24:53] you know Jen can't design everything that she's described here for [2:24:57] Alternatives she's kind of coalesced what she thinks might be the [2:25:03] preferred but that that that is my next question for those of the steering [2:25:08] committee who are here and we'll exchange an email as well just to make [2:25:11] sure we get everyone's input because I know someone wasn't here is um did you [2:25:16] hear what I heard I just summarized it for you but Rose will have it in her [2:25:20] notes in case she heard it differently or Elizabeth heard it Stephanie heard it [2:25:23] differently um but what I heard and what I take as my charge from that is for [2:25:29] this to be a successful product and report I have to come up with then what [2:25:34] are the constraints around that because I was con you know concentrating my [2:25:39] share juice pack off a different area than necessarily we're talking about [2:25:44] here um I have to look at those about evaluate those impacts and think about [2:25:49] what those you know we all know in that area that I will call the hurricane Ira [2:25:54] area um you know it's going to be talk to accomplish Shar these path there we [2:25:58] have to look to see how that could be and what the impacts of how do you get [2:26:02] that permitted like that could be challenging um you know those those [2:26:06] types of things so but I I would like to confirm and I will do this VI an email [2:26:11] that that is the direction and that that is the long-term vision of the town and [2:26:17] um then we can put together the scoping study with kind of that gaser approach [2:26:20] that I just mentioned if the steering committee is supportive of it so Sarah [2:26:25] in terms of getting final approval from the town as [2:26:30] to what gen should use to finalize the report is there going to be a step I [2:26:38] mean I'm assuming the steering committee is not going to make that decision [2:26:41] you're going to carry yeah the steering committee should [2:26:46] make the rec engb right um so Jen will give you something to [2:26:54] work with as far as a preferred alternative based on all these options [2:26:58] so it'll get steering committee approved or edited first and then something [2:27:04] brought forward to the select board to sign off on and then she'll proceed with [2:27:10] that in that is the alternative in the report yeah so your initial research [2:27:17] though had less um barriers on the west side of the [2:27:25] road on the sugar and SP side of the road going down to yes yeah yep that was [2:27:31] where we had but it fits in with what people said [2:27:34] about having it on the North side for the rest of the corridor which is nice [2:27:39] because what we don't want to do is to create a w pth that cross yeah um the [2:27:45] the only concern I have with that is that most of the [2:27:49] recreational uses in mending are on the other side of the road and that we [2:27:54] were're not accessing wheelerville road which has all the hiking [2:27:58] p and it's heavily used and it's heavily used so and you know kind of tying into [2:28:05] what Fred said about making sure that we're presenting what's best for what's [2:28:10] best for Ming are we connecting resources correctly we connecting [2:28:16] resources think about that by looking again we'll have to just double check [2:28:19] the the resource constraints um so maybe we think about doing on the south side [2:28:24] of Route four and then think about having a goal of having a Crossing near [2:28:32] um you know Park Lane or you know one of the connections to have to the northw [2:28:37] Pole right why couldn't it be on one side and kind of coming up from the [2:28:43] Rutland Town Line and then switch over certainly it can if you were going to I [2:28:49] would do it right in that kind of Village area and make that transition in [2:28:52] the village yeah that's certainly where you want a crossing [2:28:56] any yeah so yeah I guess I'm not quite s on [2:29:03] keeping it on one side or the other and I think at the Rutland Town Line at Town [2:29:09] Line Road I think from the local concerns there was talk about a Crossing [2:29:13] there as well to get from town Ro to the other side that's going to be a tough [2:29:20] one again because it's headed downhill and speeds there yeah so I'm not sure [2:29:25] about a crosswalk at that location I think that's going to be harder than [2:29:30] harder to um manipulate than in the actual Village District where where we [2:29:36] have a little it's not as steep but we have a little more control over it s [2:29:41] also Recreation Center which is way down La of which is other side as well that [2:29:47] people so the Shar pass coming up from l Road on that side of the road up [2:29:54] until they can safely cross somewhere beyond the [2:29:59] orchard um so that they can get on the other side of the road in order [2:30:03] to go to depalo's coffee or or down to Sugar and Spice or go over to [2:30:10] Northwood um seems to make a little bit more sense as far as connecting our [2:30:16] resources [2:30:18] but we're still oh but then we're on the North side and we want to be then [2:30:25] on the south side for wheeler though however yeah [2:30:29] yeah hard our resour yeah past Sugar and Spice going up so you're still talking [2:30:38] about being on the North side up to like the village and then at the village is [2:30:43] where you then would transition over to access most of the resources that are on [2:30:49] the uphill side through the village are on the right hand side of the right so [2:30:54] there to the trails [2:30:59] from where is that um it's the vending road so you go [2:31:06] downtown Lane Road and then up the notch Road in order to turn on we have a small [2:31:12] Recreation Area there that's that's what I thought you there was the crosswalk [2:31:18] down at that end and then [2:31:23] connection to you know to the Northwoods pool because I'm in the bed enough [2:31:27] people that I probably um you know would like to be a part of that connecting to [2:31:32] that resource and then there's a huge demand to want to put some sort of share [2:31:38] use path on for we get wider so that it's safer to walk on room we it just [2:31:44] that takes a lot of coordination between the two [2:31:51] communities okay um yeah so we can see about laying it out and think about what [2:31:55] those where how to how to cross people how to [2:32:01] um what look at what those resource impacts would be doesn't seem that it [2:32:05] would be good to have that multi-use path sort of stay on one side and then [2:32:12] anticipate going up to the town lining up here P right and not be [2:32:21] Crossing yeah I mean let's think about it I mean let's think about whether it [2:32:25] makes sense I don't love it going and crossing and Crossing back like I think [2:32:29] it would be better to try to be more consistent and have Crossings to get to [2:32:34] the destinations you want to get to um but if it crosses once if that makes [2:32:38] sense I I think that could work um let's give it a little thought and [2:32:44] look at those resource constraints [2:32:51] yeah right so that I think that transition zone is going to determ a lot [2:32:56] honestly I don't know if you're gonna have an off-road option I don't know if [2:33:00] I am either which is kind why I stayed away from it but it's evated I mean if [2:33:04] that's um you know an Offroad auction is going to be really challenging in that [2:33:08] transition zone and you know look at what you to that [2:33:15] yeah [2:33:19] let's look at it I mean I can see why people want it but that could be it [2:33:24] could be challenging think it's gonna be outside [2:33:28] your [2:33:32] budg that's right you can always build it it's how much it's gonna C the [2:33:37] problem thank you everybody online sticking with [2:33:45] us [2:33:49] and I don't know how you collaborate with the with the towns but that's a I [2:33:53] mean I history getting grant money the more [2:33:58] you show collaboration with and I actually don't know where that goes but [2:34:04] when when you look at that area how does that get over the Middle Lane Drive does [2:34:09] that go over to chy I mean the the the path the pathway know had a number of [2:34:14] different Maps no oh the the most recent I saw was the section it's gonna come [2:34:21] from the CH and pfield TR just completed it's going to come through M through the [2:34:26] national forest it will be a Spur that connects to the Killington Trail a Spur [2:34:30] that connects to the forest service and the main Line's going to go out towards [2:34:34] like Northwood and the idea is that it connects to Northwood and then from [2:34:38] there to like Pine Hill through the city why I asked that question is because [2:34:41] when we had the the I remember we came up with the chip Highway that went J but [2:34:49] how do you think living [2:34:55] int know when you think about that oh that they were gonna have the [2:35:00] alternative that didn't work how were we G to get the kids to bar so they were [2:35:05] talking about that and I was wondering if that beond path goes over that way so [2:35:12] I mean that was an alternative the only one that actually we had as a backup so [2:35:18] I just didn't know I havn't seen a map I'm just finding out about this so Jen [2:35:23] were you one of the people that had to walk the woodi parkway at night and you [2:35:26] had Mike Bron warning you about the mother bear and the two Cubs so he had [2:35:29] no not I only was on the wood Parkway during the day oh yeah long days you [2:35:36] know good for you I was wondering if it would be if you already know about the [2:35:41] book we wrote about and and we're still remembering [2:35:46] that because that really brought our time together [2:35:49] especially soive as a I've been a tra engineer 30 years like talk about [2:35:54] Innovative thinking to solve a transportation problem and just um that [2:36:00] you know you can figure it out without having that highway there like you can [2:36:04] get people too I got my groceries and although I could have carried M did a [2:36:08] little one at the time with me um but they did give me a ride [2:36:14] in well thank you yes than okay folks online we are [2:36:19] adjourned I'm going to go ahead and just connect have a good rest of your night [2:36:23] and thank you for joining [2:36:44] us