1 00:00:00,180 --> 00:00:12,540 All right. I'm going to go ahead and call this meeting to order at 401, Madam Clerk, would you please call roll. Yes, commission our de-drick. Or council member. 2 00:00:14,140 --> 00:00:24,560 Council member de-drick. Here. Council member, dynas. Here. Council member, temple. Here. And, Acting Mayor, Carwin. Here, yes, of course. 3 00:00:26,680 --> 00:00:35,320 All right, so let us do our flag solicit, Commissioner Diedrich, would you please lead us in the flag solicit? 4 00:00:35,540 --> 00:00:37,260 Do it in your Commissioner's voice, and 5 00:00:56,740 --> 00:00:59,160 of course, he's a council member, we all know that. 6 00:01:00,500 --> 00:01:06,860 All right, so here we are on a special meeting for the discussion of fiscal year 2627, 7 00:01:06,980 --> 00:01:12,420 capital improvement program, mid-cycle budget review, we're very excited for this. 8 00:01:12,420 --> 00:01:16,960 So could I please ask a director Hickey to introduce the item? 9 00:01:20,660 --> 00:01:22,240 Yes, so good afternoon. 10 00:01:22,540 --> 00:01:27,320 Acting Mayor, members of the Council, city staff, members of the public. 11 00:01:27,660 --> 00:01:33,760 It's my pleasure to be here tonight to introduce the mid-cycle review of the CIP program. 12 00:01:33,900 --> 00:01:41,060 And so as the council knows, we adopted a two-year budget last June, which covered fiscal year 2526. 13 00:01:41,060 --> 00:01:47,880 We're now in the process of updating the second year of the budget, which is fiscal year 2627. 14 00:01:48,080 --> 00:01:52,180 And so, departments have been working diligently, putting their requests together. 15 00:01:52,300 --> 00:01:55,700 We've been meeting with the departments with the executive office. 16 00:01:55,940 --> 00:02:01,020 And so part of that process, too, is to come back to the council with some proposed updates for 17 00:02:01,020 --> 00:02:05,300 the CIP part of the budget, part of the cycle. 18 00:02:05,300 --> 00:02:12,240 And so the CIP program actively currently has 69 active projects. 19 00:02:12,640 --> 00:02:18,900 There was $14.3 million in the original budget that was adopted by the council last year. 20 00:02:19,280 --> 00:02:23,820 That was for nine projects for fiscal year 2627. 21 00:02:24,000 --> 00:02:29,820 And so Nick is going to walk us through the proposed updates, but just kind of a spoiler alert. 22 00:02:29,820 --> 00:02:35,520 We're looking for $5.7 million of additional funding for six projects. 23 00:02:36,200 --> 00:02:40,980 Five of those projects are existing projects that we're just asking for additional money for. 24 00:02:41,260 --> 00:02:51,980 The sixth project is a new project, but it's sort of connected to an existing project that will help bring that project to completion. 25 00:02:52,340 --> 00:02:57,200 So with that, I will turn it over to Nick and he can walk us through the workshop. 26 00:02:57,520 --> 00:02:57,760 Thank you. 27 00:02:59,450 --> 00:03:00,850 Thank you, Travis. 28 00:03:01,410 --> 00:03:07,190 Good afternoon, Acting Mayor and Carlin and Council Members, Nick Fiddler, Public Works Director for the City. 29 00:03:08,510 --> 00:03:16,210 Tonight, we will be going through as Travis indicated the fiscal year 26, 27 mid-cycle budget presentation if I can have that brought it. 30 00:03:21,790 --> 00:03:26,790 This little chart is showing us where we're at today, April 15, 2026. 31 00:03:27,130 --> 00:03:28,930 We're doing our CIP community workshop. 32 00:03:28,930 --> 00:03:42,330 After today, we will be moving into our May 7th, 2026 CIP budget to quality of life oversight committee and the May 20th back to the council for our main budget workshop, 33 00:03:42,790 --> 00:03:54,430 May 27th, CIP budget to planning commission and then June 3rd, if all goes well, we'll be working again, CIP public hearing and budget adoption process. 34 00:03:54,430 --> 00:03:58,190 So a lot of little steps to get through, but we're excited to get there. 35 00:03:59,690 --> 00:04:04,290 So this is a slide you've seen recently, just a couple of months ago we went through the, 36 00:04:04,290 --> 00:04:11,270 what the active projects that we've been working on in our CIP program as Travis has mentioned. 37 00:04:11,510 --> 00:04:12,850 We have 69 projects. 38 00:04:13,610 --> 00:04:15,930 13 are in the transportation. 39 00:04:16,590 --> 00:04:19,470 We do have one on hold, the Bailey Park Boulevard. 40 00:04:19,470 --> 00:04:40,950 We have seven projects in our pavement management program and four in our traffic signals, three in drainage, ten active projects in our public facilities with one on hold, the above ground fuel station, and then three in our studies and then moving on to the next page as they continue to grow. 41 00:04:40,950 --> 00:04:51,230 We have 12 projects in our street improvements, 13 in our parks, recreation and trails, and two in our IT. 42 00:04:52,090 --> 00:05:03,650 Right now we have 41 projects that are in the planning to design phase 16 projects that are in construction with 10 being completed and the two that I had mentioned that are on hold. 43 00:05:03,650 --> 00:05:04,670 So, 44 00:05:07,360 --> 00:05:35,440 this is the, Travis has mentioned we had had a previously adopted a budget of 14.2 million for various projects within the 26, 27 as he had stated, we are in the second, or moving into our second year of a two year cycle, the projects listed above were what were previously approved today, we're going to be looking at some additional projects or additional projects and additional funding to existing projects. 45 00:05:35,440 --> 00:05:36,180 Well, 46 00:05:39,920 --> 00:05:46,820 this is where we get into where we're requesting the $5.7 million that Travis gave the spoiler to. 47 00:05:47,660 --> 00:05:59,700 As you can see, we have a total of $99.7 million in active capital improvement projects through fiscal year 2526. 48 00:05:59,880 --> 00:06:01,060 A lot of that is carryover. 49 00:06:01,160 --> 00:06:07,080 We did not approve appropriate $99 million in fiscal year 2526. 50 00:06:07,080 --> 00:06:22,880 But this accounts for some of the larger projects that we're working on, for instance, the Bradley Road Bridge, which is a roughly $20 million project, and a lot of the bigger projects that were continue to accumulate monies for to go through construction. 51 00:06:22,880 --> 00:06:28,480 So, the previous page showed the 2627 adopted. 52 00:06:28,480 --> 00:06:30,760 This is just broken down into category. 53 00:06:31,120 --> 00:06:35,540 You can see the 14.26 million, again, at this location. 54 00:06:35,820 --> 00:06:39,620 And then what we're requesting at fiscal year 2627, 55 00:06:39,740 --> 00:06:43,500 mid-cycle budget request is 5.7 million, 56 00:06:43,740 --> 00:06:47,240 2.5 million being in the pavement management program, 57 00:06:47,260 --> 00:06:50,440 and 3.2 million in the parks, 58 00:06:50,440 --> 00:07:06,340 registration and trails program, and if you add all this together, we're now looking at a $119 million capital improvement program to continue to build the infrastructure within our community and maintain our community infrastructure. 59 00:07:06,340 --> 00:07:07,520 So, 60 00:07:10,350 --> 00:07:14,490 the first projects we'll be looking at are pavement management program. 61 00:07:14,750 --> 00:07:21,650 The two little slides on either side are what are proposed for the fiscal year 627. 62 00:07:22,190 --> 00:07:28,970 The projects in the purple on the left hand side are Cape Sill, Slurry Sill projects. 63 00:07:29,510 --> 00:07:37,110 Those are both off of Holland, one on the left hand side is the northwest corner of Holland and 64 00:07:37,110 --> 00:07:42,750 Bradley and the one on the right hand side is Holland Road, just east of Menophe. 65 00:07:43,410 --> 00:07:48,750 And then we're looking at on the right hand side of the screen is Bradley Road and that 66 00:07:48,750 --> 00:07:55,150 is from our proposed Bradley Road bridge crossing all the way up to Cherry Hills to kind 67 00:07:55,150 --> 00:08:03,630 of help complete that improvements for the project as we're continuing to complete out the bridge 68 00:08:03,630 --> 00:08:05,550 over the Salt Creek Trail. 69 00:08:05,550 --> 00:08:12,570 And those, again, those have already been approved, those were in the original 2627 budget request. 70 00:08:13,210 --> 00:08:21,490 So moving into the 267 budget request, we're looking at 1.5 million for slurry sales. 71 00:08:22,510 --> 00:08:31,030 And 1.4 million will be coming from a quality of life and 60,000 out of measure A. And then 72 00:08:31,030 --> 00:08:34,150 And if we look on the right-hand side of the screen, we're looking at local roads, 73 00:08:34,330 --> 00:08:35,770 AC resurfacing program. 74 00:08:37,370 --> 00:08:43,310 We have a combination of a million dollars out of various funding sources from gas tax 75 00:08:43,310 --> 00:08:48,010 measure A and RMRA, which is the SB1 gas tax. 76 00:08:48,870 --> 00:08:54,690 If you guys remember, we just had our PMP program not too long ago to update as we were going 77 00:08:54,690 --> 00:09:04,330 through that the program indicated that we should be spending about $10.6 million to maintain a PCI of 75. 78 00:09:04,990 --> 00:09:10,730 Historically, we've been programming about $4 million towards that program. 79 00:09:11,190 --> 00:09:20,710 This request is to help us get closer to that $10.6 million, but just know that the $6 million isn't everything that we're providing for 80 00:09:21,530 --> 00:09:35,090 maintenance, payment management, as you guys are aware we have a lot of development that in our community that does also provide some efforts to improve the quality of our payments. 81 00:09:35,430 --> 00:09:41,850 Whenever a tract comes in, they are also resurfacing or reconstructing roadways. 82 00:09:41,850 --> 00:09:53,130 is a lot of our bigger CIP projects, the roadway improvements, for instance, the Holland Road over crossing that project added a significant amount of pavement rehab. 83 00:09:53,550 --> 00:10:06,850 If you take the sections of Holland Road that we reded from hand over to analog and then the sections from Holland back to the freeway. 84 00:10:06,850 --> 00:10:33,430 Okay, so those type of projects we still are also improving existing infrastructure so that does help us bridge that gap to the 10.6 million, but the overall goal is to continue to try to build up and maintain that 75% and by doing that we're requesting the additional $2.5 million this fiscal year to bring a total of $6 million to the program. 85 00:10:34,170 --> 00:10:38,530 just dedicated purely to pavement management. 86 00:10:42,880 --> 00:10:50,040 So a one key note would like to point out, we are proposing 1.4 million of quality of life revenues. 87 00:10:50,680 --> 00:10:56,760 That is why we do have to go to the quality of life measure committee coming up. 88 00:10:57,020 --> 00:11:06,780 But also we may need to revisit those figures as the year in closes out to ensure that the revenue was still there. 89 00:11:06,780 --> 00:11:12,600 If the revenues are not there, we will look to replace that funding with a different source. 90 00:11:16,600 --> 00:11:27,180 So these are three existing projects that our community services division are proposing to add additional funding to the Gail Web Breast Room. 91 00:11:27,860 --> 00:11:33,920 You can see that already approved to date is 550,000 out of various funding sources. 92 00:11:33,920 --> 00:11:41,000 is we are requesting $86,152 out of our diff parks for various. 93 00:11:41,600 --> 00:11:46,340 This will help complete that project, the way to add a little bit more sewer infrastructure 94 00:11:46,340 --> 00:11:52,140 that needed to go into that project so that that will help us put in the permanent sewer system 95 00:11:52,140 --> 00:12:01,400 that way we can have a fully functional restroom, it would not be a septic tank type system. 96 00:12:01,400 --> 00:12:11,060 And then for the CIP, 2416, 12-value nature park, this is to complete the 12-value nature park construction. 97 00:12:11,520 --> 00:12:13,660 We're asking for an additional $2 million. 98 00:12:14,120 --> 00:12:31,200 You can see that we've already had program $1.5 million, $750,000 of that being a grant, roughly 50,000 in parks and 99 00:12:31,200 --> 00:12:42,180 is from the quimbee, so that will bring that project total up to $3.5 million and that is anticipated what is needed to complete that project in construction. 100 00:12:43,480 --> 00:12:50,000 And then another park space improvement, this is for the Sun City, green space construction. 101 00:12:50,700 --> 00:12:58,020 You could see that we had roughly $687,000, a combination of quimbee and grant funds. 102 00:12:58,020 --> 00:13:05,020 And we're requesting a million dollars out of our Diff Park city wide program to bring that project up to 103 00:13:05,020 --> 00:13:14,560 1.6 almost 1.7 million dollars. And again, that was is what is anticipated to be necessary to complete the construction of that project as well. 104 00:13:16,260 --> 00:13:24,340 And then lastly, we do have a new request. This was to help facilitate a lot of the new development that's going around our 105 00:13:24,340 --> 00:13:33,080 our Central Park, you're familiar with the Central Park Amphitheater Project. 106 00:13:34,010 --> 00:13:46,360 This will help enhance that project by improving the lawn and seating area around the amphitheater to create more of a visual and 107 00:13:46,360 --> 00:13:52,560 an audio experience. Right now it kind of the grass turf area flattens out as you get 108 00:13:52,560 --> 00:13:57,820 further away from the amphitheater. It makes it harder for the people in the back of 109 00:13:57,820 --> 00:14:02,820 the crowd to see and hear the program. So what we're proposing is to create a little 110 00:14:02,820 --> 00:14:08,580 bit more of a slightly elevated turf area to give the people that are in the back of the 111 00:14:08,580 --> 00:14:13,640 audience the ability to see over the people in the front and just help complete that overall 112 00:14:13,640 --> 00:14:21,600 sound. And also to complete the overall project, the whole area itself. We have a lot of investment 113 00:14:21,600 --> 00:14:27,520 within this area. We just completed the Civic Center parking lot which will support events and 114 00:14:27,520 --> 00:14:33,680 venues for the amphitheater. We're almost complete with the pedestrian bridge crossing which will help 115 00:14:33,680 --> 00:14:43,380 integrate the commercial areas to the east of Han and to the west of Han to gather into the 116 00:14:43,380 --> 00:14:50,000 amphitheater space so it was this request we're asking for $150,000 to make some landscape 117 00:14:50,000 --> 00:14:57,020 enhancements which will also include some trees for shade and help sound for the adjacent 118 00:14:57,020 --> 00:14:59,980 neighbors and visibility to the adjacent neighbors. 119 00:15:00,720 --> 00:15:29,800 Just to make an overall better atmosphere for that entire project or that whole area. Just to go back for the recap of the funding requests. So we're looking at the pavement management program of a total of 2.5 million broken up on the right-hand side of all the different funding sources and the same thing, again, for the parks, trails, and recreation. 120 00:15:29,800 --> 00:15:42,840 for a total of 5.7, $36 million with the only one project being the Central Park lawn seating and landscape improvements. 121 00:15:43,300 --> 00:15:47,660 And I forgot to mention that was Quimby funds that were proposing for that project. 122 00:15:49,990 --> 00:16:00,470 So recommended action is to review the Capital Improvement Program fiscal year 26, 27 mid-cycle budget review presentation and provide feedback to staff. 123 00:16:00,470 --> 00:16:06,070 So with that, I would open it up for questions and comments. 124 00:16:07,290 --> 00:16:08,430 Thank you, Director Fiddler. 125 00:16:09,090 --> 00:16:14,450 Well, now is the time when we can ask questions of staff before we get into discussion of it. 126 00:16:14,570 --> 00:16:19,170 So council members, do we have any questions for staff on the technical aspect of things or 127 00:16:19,170 --> 00:16:21,690 the governmental aspect of things? 128 00:16:21,690 --> 00:16:22,010 A 129 00:16:24,090 --> 00:16:30,850 couple of things, Nick, you have one of the payment management program, 130 00:16:32,510 --> 00:16:36,790 the manufacturing road resurfacing from Simpson to McCall is under construction. 131 00:16:37,730 --> 00:16:44,590 Where is, but I drove that today, I didn't see it, it is complete where there should have been a little 132 00:16:44,590 --> 00:16:47,490 asterisk next to it that's substantially complete. 133 00:16:47,710 --> 00:16:50,270 It's just finally now at the construction document. 134 00:16:50,270 --> 00:16:59,630 Okay, yeah, you're right, it's it's it's dying it's we just have to work through the whole notice a completion filing process before we actually take it off the list. 135 00:16:59,630 --> 00:17:11,850 But Simpson goes your time from Simpson all the way back to my call is that when you're looking at Simpson call my Simpson starts there was nothing that was done. 136 00:17:11,850 --> 00:17:19,850 And between what Antelope and Simpson, I thought that was it further, right? 137 00:17:20,270 --> 00:17:24,970 It actually went to Aldergate to make call. 138 00:17:25,250 --> 00:17:27,950 Yeah, we extended the limits with additional funding. 139 00:17:28,330 --> 00:17:33,270 And just out of my sense of curiosity then, McCall widening as soon as out to bid. 140 00:17:33,490 --> 00:17:34,670 What are the bids due back? 141 00:17:35,250 --> 00:17:36,930 We actually received them last week. 142 00:17:36,930 --> 00:17:42,710 So we are working, working to put that on the council agenda. 143 00:17:43,330 --> 00:17:45,210 Perfect. Thank you. That was the right answer. 144 00:17:45,550 --> 00:17:48,210 Yeah. Thank you. Questions on this side? 145 00:17:49,370 --> 00:17:50,270 I've got a few. 146 00:17:52,900 --> 00:18:02,060 Looking at slide number seven, this, specifically the Bradley Project in conjunction with the bridge. 147 00:18:03,360 --> 00:18:07,720 Obviously, we're waiting until the bridge project is complete until that begins. 148 00:18:07,720 --> 00:18:14,200 How soon after, is it acceptance of the project that we're going to wait on from City Council? 149 00:18:14,440 --> 00:18:20,080 Is it once they pull the tractors away or we're going to start rolling on which the connection between those two? 150 00:18:21,600 --> 00:18:25,900 So the bridge will actually be done in October. 151 00:18:26,760 --> 00:18:36,620 This project still needs to go through design, so it will not go into construction probably until spring or summer of next year. 152 00:18:36,620 --> 00:18:40,560 Why do we need to wait for design, why can't the design be done now? 153 00:18:41,440 --> 00:18:48,120 It's not a project yet until July 1st, it becomes a project in our CIP program. 154 00:18:49,420 --> 00:18:54,980 So we typically start once they are entered into our CIP program. 155 00:18:55,720 --> 00:19:01,620 Plus it's a staffing level, just for us to get it out to construction. 156 00:19:01,620 --> 00:19:08,820 and we're currently working on 25-26 projects and then we'll move into 26-27. 157 00:19:09,260 --> 00:19:15,480 So what is the, if all goes according to plan based on this program, what is the anticipated 158 00:19:15,480 --> 00:19:18,900 timeline of the start of that project, if all goes perfectly? 159 00:19:19,060 --> 00:19:24,460 If all goes perfectly, we'll be looking at April, May of next year to start the resurfacing, 160 00:19:24,940 --> 00:19:27,360 if there's no significant challenges. 161 00:19:28,500 --> 00:19:37,320 So you're saying it would go, it would become a project July of this year and that's what we can start design and bids for the, we have to start with a bid for the design. 162 00:19:37,940 --> 00:19:41,380 More than likely that will be done in house, but good. 163 00:19:41,600 --> 00:19:44,380 Yeah, so it projects like that we typically do in house. 164 00:19:45,220 --> 00:19:53,420 All right, so April or May of 27 is when the dream start time is. 165 00:19:53,420 --> 00:19:58,320 And any idea of a project of this magnitude, how long it would take to complete? 166 00:19:58,820 --> 00:20:03,220 It's maybe like one and a half to two month process. 167 00:20:03,540 --> 00:20:11,980 It's a pretty straightforward, unless there's a lot of ADA ramp modifications, those sometimes slow the project down. 168 00:20:12,440 --> 00:20:18,460 And the number one question I'm going to get is, will Bradley Road remain open while that's happening? 169 00:20:18,740 --> 00:20:18,900 Yes. 170 00:20:19,280 --> 00:20:23,000 Okay, so we're not going to open the bridge and then close Bradley the rest of the way. 171 00:20:23,000 --> 00:20:28,420 No, it will remain open, we will do in phases. 172 00:20:28,860 --> 00:20:38,780 Okay, great, and so moving down into my questions, the above ground fuel station is on hold, why is that on hold? 173 00:20:39,820 --> 00:20:50,200 So we started working through that process and started working with potential vendors to install a tank system. 174 00:20:51,060 --> 00:21:00,240 We're also, the only, we were looking at primarily, it was originally supposed to be at our fleet PD facility. 175 00:21:01,180 --> 00:21:04,960 As you are well aware, we do not own that facility. 176 00:21:05,740 --> 00:21:13,000 So, we went through and we looked at, okay, can we pick it back off of something what EMWD was working on? 177 00:21:13,000 --> 00:21:19,420 we talked to them about getting some plans because they were actually going through a similar 178 00:21:19,420 --> 00:21:27,940 fuel station. However, the amount of environmental work and the site work that we required to 179 00:21:27,940 --> 00:21:36,460 install a facility like that on a least property would be very costly and we don't have a permanent 180 00:21:36,460 --> 00:21:45,360 site yet. So ideally, we would like to put it at the future PD slash mock facility because 181 00:21:45,360 --> 00:21:51,540 that's where most, the least department is the one that uses the most fuel and same 182 00:21:51,540 --> 00:21:52,440 with the mock. 183 00:21:52,560 --> 00:21:55,120 That's intersection of Bradley and Cherry Hills. 184 00:21:55,280 --> 00:21:55,460 Yeah. 185 00:21:56,100 --> 00:22:02,020 Correct. That would, that would be the ideal location. There's, it became very complicated 186 00:22:02,020 --> 00:22:05,220 when you're trying to put an infrastructure like that on least property. 187 00:22:05,220 --> 00:22:14,960 So the on hold is because we're looking for a location, because right now we're paying just retail pump prices for gas for all of our fleets. 188 00:22:15,500 --> 00:22:15,560 Correct. 189 00:22:17,300 --> 00:22:27,420 And is there any creative thinking going on about a way to get a fleet pricing or anything like that because that's just an insane amount of money? 190 00:22:28,120 --> 00:22:37,340 It is, there are different fuel networks, but there's limited fueling stations in our area. 191 00:22:38,620 --> 00:22:40,160 Well, circle case, sell us a pump? 192 00:22:40,740 --> 00:22:41,280 Yeah, I know. 193 00:22:41,460 --> 00:22:42,280 That would be really nice. 194 00:22:44,640 --> 00:22:48,420 Yeah, we can explore different types of fueling networks. 195 00:22:50,100 --> 00:22:55,280 I would really like, because we're looking at five or more years down the road before that's 196 00:22:55,280 --> 00:23:05,680 possibility if that's the intended location, and if we're paying, I mean, we're probably paying 20% more for gas than we should be, and expanding the vehicles and all that other stuff. 197 00:23:05,840 --> 00:23:11,600 So I'd appreciate if somebody could do some research into what an option would be to maybe bridge that gap. 198 00:23:12,380 --> 00:23:16,180 Let's see, specifically, we're talking about road improvements and things like that. 199 00:23:16,300 --> 00:23:23,580 We had talked about, and we had funded a sidewalk, the missing link sidewalk on bar net outside the club, has that been completed? 200 00:23:23,580 --> 00:23:25,540 We are designing it right now. 201 00:23:25,960 --> 00:23:30,100 We've had, as you may be aware, we lost a lot of staff in our CIP program. 202 00:23:30,340 --> 00:23:35,680 So I'm actually utilizing staff in my land development engineering to help facilitate 203 00:23:35,680 --> 00:23:36,320 that. 204 00:23:36,560 --> 00:23:41,020 And yes, the design is getting very close to completion that we can put it off the bed. 205 00:23:43,630 --> 00:23:47,990 How many people is fully staffed for you and how many do you have? 206 00:23:48,590 --> 00:23:50,350 In my CIP program? 207 00:23:50,550 --> 00:23:50,770 Right. 208 00:23:50,770 --> 00:23:50,850 Right. 209 00:23:51,730 --> 00:23:54,830 Fully staffed as six, and I have three. 210 00:23:57,370 --> 00:24:00,530 And is there anything that you need from us to help that? 211 00:24:00,630 --> 00:24:05,930 Because public works seem to be the number one concern for folks, roads, and all of those kinds of things. 212 00:24:06,050 --> 00:24:11,550 All the stuff that you do that's in here is the number one thing that we hear about from the city. 213 00:24:11,970 --> 00:24:16,070 So, there's no people, is there no people? 214 00:24:16,070 --> 00:24:20,510 I have recruiting, yeah, I've been recruiting for months. 215 00:24:20,510 --> 00:24:30,530 We actually had a very good recruitment process going right now, because we do have one vacant position, and I did have four very good candidates. 216 00:24:31,250 --> 00:24:43,450 We've been recruiting for Carlos's position since October, and we've been through negotiations a couple times and could not meet on salary. 217 00:24:46,670 --> 00:24:58,230 engineering is a very high demand. So we're working, it seems like the tides are kind of shifting because we're starting to get more applications. 218 00:25:00,650 --> 00:25:08,730 It's just a challenging area, especially traffic engineers. They're like gold right now. If you can get a whole of a traffic engineer, 219 00:25:14,570 --> 00:25:21,130 So on the payment management program list, the additional funding you're asking for for the 220 00:25:21,130 --> 00:25:27,310 slow-receal program, what is the reason that we're asking for more money of that now if 221 00:25:27,310 --> 00:25:30,430 we can't get to everything yet, why are we needing more money to fund it? 222 00:25:30,810 --> 00:25:33,290 We typically get through it every fiscal year. 223 00:25:34,210 --> 00:25:38,710 There is a process because some of the slow-receals take a little bit longer because we go 224 00:25:38,710 --> 00:25:43,290 go in and do a crack seal first then we let it cure out a little bit and then put it out 225 00:25:43,290 --> 00:25:51,530 to construction. But we try to go through our payment management program each year. One 226 00:25:51,530 --> 00:25:56,450 that's kind of been delayed is the analogue road but that's because we added additional 227 00:25:56,450 --> 00:26:05,450 segment to it originally went from Holland to Newport but we through the council we got 228 00:26:05,450 --> 00:26:09,830 additional funding that we can take it all the way up to Alder Gate. That way we can make 229 00:26:09,830 --> 00:26:16,850 some improvements at the intersection of Newport and Antelope and do all the restriping to make 230 00:26:16,850 --> 00:26:24,710 that intersection better. So that project is almost complete with design, but that's the only one 231 00:26:24,710 --> 00:26:34,070 that has kind of fill out that cycle that's an older project. So when this thing becomes crystallized, 232 00:26:34,070 --> 00:26:53,430 Is it, would it be possible to publish a schedule of the project or at least the order in which the projects are going to be done even if we don't have dates so the public can know that their section of road has been selected and at what point it's going to be done? 233 00:26:54,050 --> 00:27:20,410 Yeah, we would, with the best we can, obviously we have a lot of things that are outside of our control because we have to coordinate with utility companies to come in and do adjustments or if they say that they want to replace a line before we come in and do work or even just for us to come in and resurface, they have to lower their facilities and then bring them back up. 234 00:27:20,410 --> 00:27:27,710 So there's a lot a lot of little nuances that we work for that work through that aren't exactly all in our control 235 00:27:27,710 --> 00:27:32,010 Will there be at least a list of the projects that are going to be done during the fiscal year? 236 00:27:32,170 --> 00:27:33,330 Yes, okay 237 00:27:33,330 --> 00:27:36,610 Yeah, we have that yeah because you said you go through the you can get through most of them 238 00:27:36,610 --> 00:27:39,410 Yeah, you might have to shuffle around timing and order and things like that 239 00:27:39,410 --> 00:27:44,750 But will there be a place on our city website that you can go here are the projects that are going to be done in the next fiscal year 240 00:27:44,750 --> 00:27:48,950 Yes, we can do that. Oh, so that doesn't exist now, but it can be done 241 00:27:48,950 --> 00:27:58,610 No, we have our CIP program, but we can, which shows what streets there are, but we can try to put it, you know, summer or fall or whatever, give them a range. 242 00:27:59,670 --> 00:28:07,630 That'd be great because right now it seems very abstract to folks and people who live on one side of town aren't monitoring what's going on on the other side of town. 243 00:28:07,870 --> 00:28:15,550 So people who live on Antelope are saying nothing's being done with the roads in the meantime, all of this stuff's being done over by Bradley Road and they don't see it. 244 00:28:15,550 --> 00:28:17,470 And that's where all of our resources are going. 245 00:28:17,730 --> 00:28:22,550 So if there's something that the public can see to track our progress in some degree, 246 00:28:22,770 --> 00:28:24,730 I think that would really be instructive. 247 00:28:24,970 --> 00:28:25,950 Yep, I appreciate that. 248 00:28:26,550 --> 00:28:30,710 All right, any other questions for staff before we move on? 249 00:28:30,970 --> 00:28:36,250 Nope, all right, Madam Clerk, are there any requests to speak or has any correspondence been received? 250 00:28:36,610 --> 00:28:37,250 None this evening. 251 00:28:37,650 --> 00:28:43,010 All right, does the council have any comments on anything you'd like to discuss at this point? 252 00:28:43,930 --> 00:28:49,970 This is a discussion item, there's no vote required here or anything, it's more instructional. 253 00:28:50,650 --> 00:29:02,270 One thing that Maristrada asked me to ask you was, where does the Quail Valley Sidewalk project fit into this? 254 00:29:02,290 --> 00:29:03,490 I didn't see that on here. 255 00:29:04,570 --> 00:29:08,390 We do not currently have a project for the Quail Valley Sidewalks. 256 00:29:08,810 --> 00:29:10,570 I thought it had been added to the CIP list. 257 00:29:10,570 --> 00:29:12,270 It might have been a level four or something like that. 258 00:29:12,390 --> 00:29:15,970 Yeah, so it doesn't fall into the funded section. 259 00:29:16,450 --> 00:29:21,870 It falls into the overall CIP program, but these are only projects that have been funded. 260 00:29:22,690 --> 00:29:32,370 So level four does not have, it hasn't been included into the funded portion. 261 00:29:32,650 --> 00:29:38,610 So it's a level four, it's still, it's on the list, but it doesn't have a funding associated with it. 262 00:29:38,610 --> 00:29:46,990 So, and I notice that the projects here, we're not here today to reorganize and reorder projects when is that meeting? 263 00:29:47,530 --> 00:29:54,010 That will become the next go around when we come through our next budget cycle. 264 00:29:55,090 --> 00:29:57,570 So, what is the anticipated date of that? 265 00:30:00,000 --> 00:30:18,580 I see June 3rd is the CFP public hearing and budget adoption. Is that when that would be? No, this is next year. Okay, so the June of 27 is when we have that re-ordering? That would probably start in April of 27. 266 00:30:22,520 --> 00:30:29,620 All right. And I know you're probably monitoring that as well. We could talk about that at that workshop. But one other thing I wanted to bring up in this sort of dovetails 267 00:30:29,620 --> 00:30:36,940 into an item that we have on tonight's full agenda, which is the ADA compliance. 268 00:30:39,300 --> 00:30:43,900 And specifically, we're going to be getting to a discussion. 269 00:30:43,900 --> 00:30:49,820 I don't want to get over my skis here, but we're going to be getting to a discussion of ADA compliance and 270 00:30:49,820 --> 00:30:52,360 things we need to do to bring the city up to ADA and things like that. 271 00:30:52,460 --> 00:30:55,680 There was one section in there where it said the city facilities. 272 00:30:55,680 --> 00:31:05,600 There is an anticipated $1.5 million expense for bringing our, the buildings that we own up to speed with regard to 273 00:31:07,540 --> 00:31:11,560 accessibility into the buildings and bathrooms and things like that. 274 00:31:13,560 --> 00:31:21,740 How do we get that onto the funding list from the report so we can actually start doing that? 275 00:31:21,740 --> 00:31:25,240 Because we have the money to do that now, and as you know, this is a pretty important issue to me. 276 00:31:26,120 --> 00:31:30,080 So I want to advocate to make sure, especially in Sun City and things like that. 277 00:31:30,580 --> 00:31:36,100 So it seems like a very, it's our stuff, it's our buildings, and we have the money to do it. 278 00:31:36,520 --> 00:31:38,280 Does that something that needs to get added to CIP? 279 00:31:40,020 --> 00:31:40,800 Yes and no. 280 00:31:41,080 --> 00:31:47,040 So we do, for instance, Fire Station 76, right, we're in the middle of a remodel. 281 00:31:47,720 --> 00:31:58,100 Those bathrooms that were there were outdated, so now the remodel is bringing those restrooms up to current standards and they're living quarters up to current standards. 282 00:31:58,340 --> 00:32:14,880 So we do, as we, through the CIP, some of those projects are added, we can add in funds for specific projects like AMR, AMR Park, that's got quite a bit of improvements that would be necessary to bring that. 283 00:32:14,880 --> 00:32:18,780 That one would probably be some component of a CIP program. 284 00:32:19,060 --> 00:32:25,600 Other parts of the components would be that we do some of the work through our own regular maintenance activities. 285 00:32:25,600 --> 00:32:30,120 Now that we know where there are some of our crews between my crews and 286 00:32:30,120 --> 00:32:35,760 community services crews can make some of the corrections as part of our operating budgets. 287 00:32:36,040 --> 00:32:44,460 But yes, you're correct, we could add some of these programs into our CIP as we continue to develop the CIP program. 288 00:32:44,880 --> 00:33:02,100 All right, so I know that that specific ask is not on this agenda item but I'm going to give you a heads up that when we get to it on the consent calendar, I'm going to be pulling it from the consent calendar tonight so we can have a discussion about that so whoever is on that I don't know if that's briser whomever is can be ready to discuss that. 289 00:33:02,560 --> 00:33:07,760 All right, anything else? That was a good discussion right there. 290 00:33:08,840 --> 00:33:14,360 So if we don't have any further discussion, any further questions, we are adjourned at 434. 291 00:33:15,360 --> 00:33:16,020 Thank you.