[0:00] Going to call the meeting to order. We're looking for approval of the agenda [0:02] for the special council meeting held July 28,2026 [0:06] to be approved as presented. May I have a mover, please? [0:09] » I'll move. >> Thank you. Seconded. Moved and seconded. [0:12] Comments or questions for members, please. [0:15] » Call the vote. All in favor? It's carried. Thank you. Going to move on to [0:19] disclosure of pecuring interest and general nature thereof. Does any member [0:23] have a interest to declare and if so, what's the general nature of that [0:26] interest? No declaration. So we'll move on to four [0:30] motions for consideration that the council of the corporation of the [0:34] village of America receive the motions for consideration documented as [0:38] presented. May I have a mover please? >> I'll move. [0:40] » Thank you. Second, please. Thank you. Comments or questions, members? None. [0:45] We'll move on to the vote. All in favor? Carrie. [0:50] Number five, Marville master infrastructure plan population growth [0:54] projection summary. I will now invite Mark Buchanan from JL Richardson to [0:59] provide a presentation on the population growth projection summary report. Mark, [1:04] the floor is all yours, sir. Thank you. And thank you for coming in person. [1:07] » Hey, welcome. Thanks for having me. Glad to be here to talk about I guess an [1:12] important part of the infrastructure master plan. Um the population [1:15] projections kind of undermine kind undermine but um are the foundation that [1:21] the whole plan is based on. So it sets the table for like what we're going to [1:24] assess from your water based water infrastructure. So I guess with that we [1:29] put together a short presentation to kind of accompany the the memo we put [1:32] together that summarized here was the growth projections and how we came up [1:36] with them um for the village of Marville. [1:42] » So starting it off some of the the key things like kind of [1:46] our approach and our assumptions that went into it. Um these form the basis [1:51] that we're going to use to assess the infrastructure master plan. These [1:53] population projections um the data we're putting in here from [1:58] the figures and the tables we we've summarized them from input from village [2:04] staff. So I want to make it clear like JL Richards isn't coming up with this to [2:08] say this is how Marville grows. It's being informed by what the community is [2:12] hearing what's coming from developers interest in the area. It's not us saying [2:17] it. It's this is this is your community telling us this is you know [2:22] um where um I guess the other important [2:27] piece is we're using the official plan to try and guide and steer where [2:31] densities and unit developments will be going. We're not creating anything new. [2:34] We're adhering to current um plans. Um where we didn't have any information um [2:41] such as um unit d like people per unit the unit density we looked at statistic [2:47] Canada for maru specific and it said well it's about 2.1 people per unit. So [2:53] we use that to fill in a data gap. >> Um the other assumption that's in here [2:58] for properties that are zoned are two. Um the official plan allows up to four [3:03] units on that development. Feedback from staff is well we're planning for we're [3:08] going to allow one one unit to go in there. So we've taken that assumption in [3:12] the plan. Um for 10 to 20 year development [3:18] timelines. So kind of the furthest timeline we were looking at for growth [3:21] projections. Um the official plan allows for a range of [3:27] unit densities. So what we were in talking with staff was well let's look [3:32] at low and medium. So we took an average of of those two [3:37] to come up with how many units would go on this vacant land. [3:42] And then the final piece of the assumptions in here is we put this [3:46] together based on the best information we have so far. Um as we work through [3:50] the master plan and I some of the bigger items at the bottom um flood plane [3:54] limits for any development that's along the river. we would update that to [3:58] reduce what the developable areas is because we don't want to develop in a [4:02] foot. So we'll shrink those areas accordingly. Um and if there's anything [4:06] else but archaeological natural heritage say wetland we'll adjust those lands [4:11] accordingly. That would adjust the development areas we're showing here. [4:16] » Yeah that's the say the primary for what went into the the growth projections as [4:22] next slide. So in going through them, we we broke [4:26] them up into timelines. So our study, we're looking at a 20-year projection [4:30] out for the village. So we broke it up into three timelines. The first one [4:33] we're looking at is 0 to 5 years. These are areas that are um either approved [4:40] for capacity and under construction um or they're approved for capacity, they [4:45] aren't under construction or there's been capacity requested. So this is [4:48] probably the most certainty in development because this is what this is [4:52] everybody's aware of what's coming. So we've kind of thrown them on a map of [4:56] the village and highlighted them in green. These are the development areas [4:59] that would be looking um to grow in the next you know the near term 0 to 5 [5:03] years. Um [clears throat] in the table generally it sums up to it's about 205 [5:08] units or 475 people. [5:15] » Do you want to introduce your >> Oh sorry. [5:19] » I know. [laughter] Sorry. >> Oh good. [clears throat] So Shose from [5:21] Aqua. um we're working with on this this important job she's served. [5:25] » Welcome. >> Thank you. [5:28] » Thanks, darling. >> Mayor, [5:32] » absolutely. [5:36] » So, the next timeline I guess is there any questions so far? Like I'll be uh [5:42] » anybody have any questions? >> Wait till the end. Yes. [5:48] » Okay. So, the next timeline 5 to 10 years. Um, so in the figure we tried to [5:54] leave the green areas on there to show that was what the 05 was. And then [5:58] anything that's 5 to 10 is kind of the the yellowy orange colors. Um, they're [6:04] generally vacant lots that were available within the the urban boundary, [6:07] the urban urban area of the rank. Um again it consists of approved capacity [6:12] capacity requested um probably a smaller total um of 42 units 119 people for this [6:20] timeline um which is less than what's in the 05 and the lowest of all of the [6:26] projections. [6:30] Thanks J. And then the last timeline we have is um 10 to 20 years. So the [6:36] furthest out in the plan in here that's all of the blue areas um [6:42] that are identified as being expected for growth. Um again a range of there's [6:49] 89 lots have been requested capacity. Um 193 um there's no capacity approved or [6:57] requested but they're available lands that is anticipated to grow in 10 to 20 [7:01] years. Um, and then there's some vacant lands that total up to about 886 units. [7:08] Um, and I think the biggest projection on this timeline is growing across the [7:13] RTO River um to those blocks that are 13 labeled 13 and 14 in the figure. Um, in [7:20] total for 10 to 20 years, it's 1,168 units or just over 2400 people. [7:30] And that's the short synopsis of the growth projections for the [7:34] infrastructure master plan. Happy to take in the questions and discuss. [7:39] » Any questions for members? [7:45] » Go ahead, counselor. >> I guess when you're doing the growth [7:48] projections, what factors do you take in consideration? Is it just what lots we [7:52] have available and what sort of stage are development or do you look at the [7:56] census scan and the trends of the population [7:59] um federally? >> No. So there was no analysis on like a [8:03] federal level of data. Um the only piece of stat scan data that we used was just [8:08] to inform if there was an unknown on um how many people would be going in a [8:13] unit. um [8:17] what we took in trying to develop the the growth projections is what the [8:20] public works department was getting um particularly in the near term uh 05 5 to [8:24] 10 was like yeah there's requests for these lands to be developed there's [8:27] requests for uh capacity on the water wastewater systems and then outside of [8:32] that what is informing it is we're maintaining growth has to stay within [8:36] the urban boundary [8:40] go ahead >> so rather than talking about it as a a [8:45] growth projection. It's really evaluating the capacity based on empty [8:51] square footage, empty empty empty lots, empty acreage, and you're allocating [8:58] [clears throat] x number of dwelling units based on the official plan for y [9:03] number of acres or lots. >> Correct. So, so this is very different [9:08] from a growth projection where we look at past historical trends. Uh people [9:15] leaving the the municipality, entering, dying, retiring elsewhere. [9:21] So, it's really just a capacity. How much land do we have? How many people [9:25] can we put on it? [clears throat] So how [9:31] how does that number whatever number we [clears throat] determine [9:36] how does that number affect the plan or the master infrastructure plan? [9:43] » So the numbers we have now we can take them and then we can start comparing [9:47] them to as we go out in time. How much capacity [9:53] does the water plant have or the wastewater plant? How does it affect [9:57] your trunk wastewater sewers or pressures and fire flowability of the in [10:02] your distribution system? We can take this information now and we can use it [10:06] in the master plan to say well here's where we think there's going to be [10:08] problems or none um moving forward in time with this um growth. [10:18] [clears throat] >> Go ahead counsel. [10:21] » Yeah. So to to build on that is essentially that it gives us um working [10:27] on on this and like I'm I'm looking it's a little bit malleable too as we go [10:31] forward because you're talking about taking flood plane um agricultural land [10:35] that types of things into consideration as we go [10:37] » not agricultural sorry >> although it was written up there I was [10:41] just saying it was written up in >> we put it [10:43] » yeah would be um so I mean like the five zero to five years highly likely uh the [10:50] 5 to 10 is [10:53] maybe likely depending on economics, that type of thing. And then the 10 to [10:58] 20 is where we have room should we require it. And so what this is helping [11:03] us to come up with plans going forward depending on how if if suddenly we [11:08] saying the growth rate is um you know suddenly speeding up or something we we [11:12] have a plan and um kind of options to consider going ahead versus um or if [11:18] it's very stagnant and just stays really we have a plan but uh we're not locked [11:25] into our >> I'd say absolutely um the timelines we [11:30] use um they almost give it context that like we can all relate with because we [11:35] all understand time >> 1 year 2 years 5 years 10 years where it [11:40] actually lands it from a technical standpoint on engineering it doesn't [11:44] really make a difference to us the amount of like water waste water [11:49] generated or required from the people that's what we care about and those are [11:54] the numbers then that we start spitting out and comparing to what's available [11:58] » and then the time just kind of gives you something that we can all understand of [12:01] Well, based on this much growth in these areas, this is the the list of projects [12:06] that would be anticipated that gives you a plan to make informed decisions as [12:10] that growth happens. >> Okay. [12:14] » Go ahead. >> So, as you know, it's it's in your [12:18] report, the the United Counties have projected a very different number for [12:23] growth um within the municipality as a whole. [12:28] So, what happens if if their numbers are closer to being correct, but we've [12:34] planned for 3,000 people to be on the system? I I don't want to see a plan [12:40] that overestimates so much. And I agree with overestimating enough to [12:46] accommodate some surprises so we're not cut caught short. But that seems like an [12:52] extreme number to plan for if our growth actually turns out to be something that [13:00] is what the county is telling us. >> Correct. [13:03] » It gives versatility I would say in decision- making. um is what it what it [13:09] allows for. Um it can be aspirational. It can be um if [13:16] there is interest in an area, it can also give data to um this council, [13:22] future council staff to inform those potential developers like here's what [13:26] you're up against uh to try and service those lands. [13:30] Um certainly as part of the the county's uh [13:36] draft um [clears throat] county's growth projections um I think one of the lines [13:41] in their report was also it would be beneficial to get backfed from this this [13:46] work to say what is the capacity that is available to support growth and that [13:50] they could refine their numbers >> more. Um but but yes it definitely is [13:56] it's more than what is in the county. [14:01] And and what happens if we don't pick 3,32 [14:08] for population projection, [14:13] but if we pick a lower number, [14:17] we plan for what the lower number will be. Okay. So, we, you know, we just need [14:23] to be on the intent of this is we just want to be on the same page with this is [14:27] what the community is interested in. This is what we're going to plan for and [14:30] this is then what the master plan u infrastructure master plan will work [14:34] towards um to give you information to make decisions. So, um we we by no means [14:41] are looking to push what the growth projection is for the community at all. [14:45] It's it's what do you want to plan for? Any [14:51] other questions for members? >> Mine's been answered. Thanks. [14:56] » Okay. Um, just for uh a little bit of clarification because we did discuss uh [15:01] the county's approach and it's been brought back to the table here. Uh, Miss [15:07] Plumbley, since the county was engaged with staff, how much of this information [15:13] is provided to JL Richardson was uh supplied to the county? Because if if [15:19] they had the same information, then I'm not understanding the [15:23] difference. >> The what's presented here is what would [15:27] be allowed under our current official plan. [15:29] » It wasn't presented to the county. >> What was presented to the county was [15:34] basically the one to five year or 0 to 5 years. [15:38] » No, no, 10 years. What we knew for sure >> that's what was presented to the county. [15:42] These are projections based on on land availability according to our official [15:47] plan. >> Okay. So, as I know, the county was [15:52] looking at long-term investments, and that's what the that's what the growth [15:56] management plan was for the counties, including all 10 municipalities, was how [16:00] was the county going to invest infrastructure dollars in the [16:04] infrastructure in support of growth uh throughout the 10 municipalities in [16:09] United, and Brenville. If they weren't supplied with this information, [16:14] the long-term information, it's harder for them to start planning on what roads [16:19] they're going to tackle. All the all the roads coming in are all county roads. [16:23] So, it needs to be understood what the pressures may or may or may not be [16:30] because we >> that's why this timing [16:33] » it happens. It happens and depends on developers what they want to buy and how [16:37] they want to develop it and so on and so forth. But that would be relative [16:41] information for them to have. So at the county level, they know how much money [16:46] they should be putting aside for county road 15, 16, and 43 [16:51] and 41. Go ahead. >> Yeah. So I I note in the appendix that [16:57] um areas labeled 13 and 14, the blue hash marks [17:03] in the staff listing of those two parcels. they staff sees those as being [17:10] beyond 20 years. Um, and I know that the the growth plan [17:14] at the county is kind of capped at 201. So, I can see why those two parcels [17:22] would not be forwarded on to onto the county and and I'd like to understand [17:28] why they show up in this report. >> Very good question. Because our scope or [17:35] mandate was 20 years. became a question of are we including [17:40] them in the plan >> or or not [17:45] » I think beyond um it's labeled in the appendix [17:51] as beyond 20 years for development according to village staff [17:55] » correct >> and that be all relative to interest [18:01] from the private sector so I mean we can say that might be [18:07] something that's looked at 20 years from now. But if there's we all see small uh [18:12] little rural villages and towns all of a sudden uh they go from zero to thousands [18:18] of homes and that those um predictions are always long-term predictions but it [18:24] depends on the interest and what's happening in around the other [18:27] municipalities that border us as well. So I mean these things could could [18:31] accelerate or they could take longer than what you're projecting. Is [18:35] [clears throat] that correct? >> I'd say I'd say that's fair. It depends [18:38] on the the social, demographic, economical conditions that exist that [18:43] may bring a development area to become more [18:46] attractive. What what may be insurmountable right now may become [18:50] easier in the future depending on unknowns. [18:53] » And another determining factor is that these are all u privately owned lands. [18:58] So they're not within the municipality's uh scope to uh manage them what they'd [19:03] like to do. It's all based on the official plan and the interest from uh [19:09] the neighboring developers I would say. [sighs and gasps] [19:13] » Correct or incorrect? >> I I generally would agree. I believe uh [19:18] um there was a development charges bylaw was recently passed like that would help [19:22] in informing well if you're going to connect to the system this is this is [19:25] the cost that should be shared by uh potential developer to get capacity. So [19:31] that would be a consideration uh that would go into a potentially business [19:35] case of someone who wants to develop something. [19:37] » Yeah. And and this is just basically for us to understand the possibility and [19:42] when we do have available infrastructure monies uh that we're investing in in the [19:49] right direction, the right space just in case uh these projections become truth. [19:56] » Correct. Thank you. If it's your vote now, go ahead. [20:01] Yeah, I just uh under the 20-y year um projection there, primarily the stuff in [20:06] the blue, I know there's some that uh see one set of the 20 years, 193 units [20:14] proposed, no capacity requested or uh granted. At the time, there's 886, [20:20] I think, parcels that just are vacant. Um and that's just as potential uh on [20:24] here. It's it's within our urban boundary, but it's potential, but it's [20:29] there's not there's no movement on whatsoever. That's just uh what what [20:32] what we're talking about. [20:36] » I think that um if we didn't include the the lands on the north side of the [20:42] river, um I think we'd have been asked why didn't you? So, if you if we don't [20:48] put it in there now, the question would have been raised, well, why didn't you [20:51] why didn't you consider that when you looked at this? Yeah, we need to to look [20:55] at all the possibilities because that's how we plan long term. [21:00] » Yeah. >> What the what the reality is and how [21:03] they play out is is uh is um something that's in the control of uh the people [21:10] that own the land and how they want to sell it or who wants to buy it and [21:14] develop it. And the lands across north side are for sale now. [clears throat] [21:19] So, [21:22] Um, so I have to admit I'm a little bit ignorant as to what a master [21:28] infrastructure plan looks like, what's what the what the content is. So I guess [21:34] my my concern right now is if we use this larger number and we plan for that [21:41] larger number, if that triggers that larger number triggers the need for a [21:46] sewage treatment plant expansion, are we now committing to [21:52] um expanding the sewage treatment plant with only, you know, the next five years [21:58] of um user fees and development charges? [22:02] is. >> So if we're planning on a really big [22:05] scope of development and we don't achieve that, [22:10] how much are we committed towards making that plan happen with a smaller resource [22:16] base? >> Fair. Um [clears throat] [22:18] say yeah, it's a it's a similar question most municipalities face. [22:23] It doesn't commit you to you have to do this. The urban boundaries established, [22:28] the official plans established. it technically allows for this type of [22:32] growth. The infrastructure master plan is just giving you the road map of well [22:36] if this actually happens the way that we're projecting it. Here's all the [22:40] infrastructure projects you're going to need. here's the additional studies [22:43] you're going to have to pursue and here's the designs that would have to go [22:46] with them um in an approximate timeline based on the timelines we've outlined [22:53] and I believe we would have no obligations uh to service lands that we [22:57] don't have capacity within our plant so that would be uh if our if and when our [23:04] plant reaches the maximum capacity and there's still lands to be developed and [23:07] there's requests for that uh we're not obligated to increase the size of the [23:12] plant to meet that uh demand or are we uh putting ourselves in a [23:19] position when that plant reaches a capacity that we're going to have to [23:23] upgrade it to continue to move forward? Is that something that we're we [23:28] absolutely have to do or is that something we can decide to do as a uh as [23:32] a municipality? >> I believe it would become a decision of [23:35] municipality. Yeah, because you're obligated. you have to operate in [23:38] accordance with the regulatory requirements and if you're at capacity [23:41] you would be um reckless to continue to add capacity to it without understanding [23:46] like no we need to grow it be able to treat it [23:49] » I knew the answer to the question I just wanted to set publicly so we're under no [23:54] obligation we we move as a municipality and create those opportunities within [23:59] the capacity that we have financially and with within our resources so it's up [24:05] to uh and that's why I guess you're projecting long-term 20 years plus. Uh [24:11] so it's it's decisions and discussions around a council table on how and uh how [24:18] we are going to move that forward and what we're going to at what speed we're [24:22] going to move that forward because a lot of these a lot of these uh builds on the [24:26] north side require a lot more input than just this is where uh growth is going to [24:32] happen. There's environmental studies and so on and so forth that have to [24:35] happen. There's infrastructure that has to be brought across the river. There's [24:39] infrastructure that has to be installed on the north side. So it's uh that in [24:44] itself is probably a seven to eight year project [24:47] uh if we were starting yesterday. So these are all things just for us to [24:52] consider these this is where the growth can happen. How that happens uh unfolds [25:00] at the discussion at the state. correct statement or [25:04] » Yeah, generally I agree with that. >> Thank you. [25:09] So, any other questions or comments? [25:13] So, did you uh want to move on to the other part of the report if we're [25:21] done with this slide or [25:28] excuse me, is there an opportunity for us to uh for the public to comment on [25:34] this? >> We'll we'll have uh we'll read through [25:37] the master plan here and see what happens. There's a is there anything in [25:42] here for the public to Julia or is this just for council public will have an [25:47] opportunity at another time? >> The purpose of the meeting is for [25:50] council to endorse projected. There's no other question period in special [25:54] meetings. >> So not at this time. [25:59] So uh are we moving on to the other part? I have another package here that [26:04] has a lot of uh documentation in it. Is or is that just [26:09] » part of this? as part of this. >> So that was the complete Okay. Cuz I've [26:13] got another 20 pages on the other side here. So [26:18] » there was a PowerPoint um summary and then there was the actual projections. [26:22] » Yeah. Okay. So that's not we're not discussing that was just for us to [26:26] review. So any questions or comments from [26:32] members while we have does Aqua have anything that they would like to add to [26:36] the conversation? Is there anything that you'd like to input or [26:41] » cover everything that we have discussed? Sorry, I'm also new to this um project [26:46] um as you're aware. So yeah, I just started working with JR. So we just uh [26:52] » I agree what they've done. So >> So this uh what's the next step after [26:58] this? So how are we going to proceed and how we're uh how we're going to get [27:02] further input from the public? as you can see that or here there's interest [27:06] for uh people to weigh in and have conversation on this. So can you perhaps [27:12] give us a little uh guidance on what the next steps are and what the [27:16] opportunities are moving forward? >> Absolutely. I'm happy to. So the [27:20] infrastructure master plan um is we're coming with a framework for how growth [27:25] will happen and then what the infrastructure that's tied to it in a [27:28] clear and transparent way. >> Part of this project we have two public [27:31] information centers that will be held The first one will be a conclusion of [27:35] what we call phase one, which is our problem definition and opportunity [27:38] statement. >> Okay. So, that'll be that'll be the [27:42] first initial opportunity for the public. [27:44] » Correct. >> And we're going to give them well [27:46] advanced notice so that they have that opportunity to put in their schedule so [27:50] they can attend if they wish to do so. >> Minimum two weeks notice. [27:54] » Two weeks notice. So, you'll have a twoe notice period before that happens. Sorry [27:58] for interrupting, but I just wanted to make sure we're clear. Go ahead. Timing [28:02] for that currently would be a draft of that public information session as a [28:08] project team we should have it in October targeting end of October to [28:11] beginning of November first week. >> Okay, [28:13] » that's when that will be out. >> Okay. [28:15] » Um the second one conclusion of the master plan is currently going till May [28:21] 2027. So be somewhere near the end there. Um April or May is when our [28:26] second public information center will be held. That's where we'll take the [28:31] findings from the problem opportunity statement. We'll develop alternatives. [28:35] How do we service this? Rank them against each other, select what we [28:39] believe to be the preferred, present it to the public for input on, hey, what [28:43] what do you think of what we have here for feedback, collect that feedback, and [28:48] then work it back into the final report that gets posted for 30-day review. And [28:53] could you perhaps uh uh uh let us understand why uh that length of [29:01] time is needed because I think we were we were hopeful that we would have [29:05] something uh presented earlier than that uh sort of pre-budget for discussions [29:12] for the next term of council so the next term of council understands what the [29:15] investments are going to be needed moving forward. So, can you uh perhaps [29:22] fill in some of the gaps of why there's such a long period from start to finish? [29:27] » Yeah. Um, it's typically how long it takes us to get through all of the [29:30] information. Um, growth projections, digest your infrastructure, take a look [29:37] at the constraints, understand what the problems are. [29:39] » Um, host a public information session, get [29:44] the feedback to incorporate, and then advance to the next stage. um using [29:48] we're going to develop um modeling tools of the water distribution system and the [29:52] wastewater collection system, apply this growth um to those tools and [29:58] then see where the problems arise and then give us time to think about okay [30:02] well how could we um address this whether it's upgrades to pipes um [30:10] redoing another street somewhere else discussions with public works if there's [30:15] a street that's in need of renewal potentially dropped infrastructure could [30:18] be located there. So you start aligning >> um your public works projects um in a [30:24] clear kind of logical sense. >> Um yeah, this is typically the timeline [30:29] that it takes us to get through u master plan. [30:32] » And as you're moving through that timeline, is there an opportunity for [30:35] [clears throat] the information that you've gathered to be in a position for [30:40] staff to be able to apply for grants so that we can move these uh things along? [30:46] uh in a more rapid pace potentially or do we have to wait? [30:52] » We can we can work with staff um to help if there's grant opportunities that are [30:57] arising while we're still working through the master plan. [31:00] » Um typically um in our experience like [31:05] successful grants they're they're they're supported by having master plan [31:11] class assessments like completed and here's the reference document. um that [31:16] the approval besides are looking for like oh yeah there's there's a lot of [31:18] thought has gone into this to understand that there's I guess less risk of this [31:22] project um not proceeding >> and would this uh information you're [31:28] gathering uh be able to be intertwined with the county as the countyy's moving [31:32] forward because I know there's discussions going to be happening and [31:35] the timeline for the delivery of this final package is not till next May as [31:40] according to you but I think the county's planning on engaging with the [31:44] municipality starting is it November uh Miss Plumbley? I think November or [31:49] something >> that they're reaching out. So, is there [31:52] an opportunity to sort of sh uh share that information as it develops uh with [31:58] the county so that uh the two can better align? [32:02] » I don't see why not. Um because that schedule itself like we be through the [32:06] phase one component um using the growth projections to determine problems [32:11] opportunities. um you could take it and yeah feed it [32:14] back into the county to say well this is what we're anticipating for broke. [32:18] » So you just need an invite from staff to do so [32:20] » if that's something that uh yeah um the village is interested in our support on [32:26] we can absolutely talk about accommodating that. [32:29] » Okay perfect. Go ahead. Uh I think councelor girl had her hand up first and [32:32] then we'll go to deputy mayor. >> Yeah. Yeah. So, I was just in terms of [32:35] public engagement as well, I was reading the uh little notice on our uh that [32:39] showed up on our agenda yesterday is that they're also welcome to contact [32:42] members of the team as well. You guys have your emails provided here. [32:47] » Um that's my understanding. The way I'm reading it, um they can contact members [32:51] of the city team listed below anytime uh with comments or questions as [32:55] [clears throat] well. Okay. in in working uh to develop a public [32:59] consultation plan, there's also a desire like we want to post anything that we're [33:03] doing whether it's memos, reports, the findings [33:07] » on um the township website. So all of this will be available for download and [33:12] if there's any members stakeholders uh regulatory authorities that are [33:16] interested in a project given its proximity where it is that means they [33:20] can reach out to shar and we will add them to our stakeholder list but it's [33:24] circulated on notices as well. >> Okay. [33:27] » Yeah. I noticed that it was on the notice yesterday so it is available for [33:31] it is publicly available. So, I'm I'm curious what alignment looks like [33:36] between the the county growth projection and this growth projection. How would [33:43] you see those two numbers aligning? [33:48] » It's a difficult question to answer. [33:54] » My understanding how the county comes up with their growth projections is they're [33:58] getting them from the province. Treasury Department saying to all of the [34:02] upper tier municipalities, this is what your growth is going to be. [34:06] » And then they go and they diving it up amongst all of the lower tier [34:09] municipalities. Um, and in practice, what we see in [34:14] other communities is it's the larger urban centers get the lion share of the [34:18] growth because they have the resources, the capacity built in to accommodate [34:22] home. Um, that's typically how it's going. having this I think it gives [34:28] opportunity to to facilitate a discussion to be like well there is [34:31] interest here's what it is so far um and I think as we've discussed like the [34:37] nearer term there's more certainty as you go longer it's becomes to a certain [34:41] part aspirational this is what we could do [34:44] » [clears throat] >> um so it can help advance that [34:46] conversation >> okay [34:49] » I [snorts] think perhaps beyond that with the interest that's [clears throat] [34:52] happening in Chemville will uh and the connection with the county roads, uh [34:57] we're going to have a lot of uh increased volume of traffic. So even if [35:01] we're not growing at a at a large rate, investment through the county [35:06] opportunity through county roads is uh an absolute for us because of that [35:12] volume of traffic that we're going to see with the growth that's happening in [35:16] North Grenville. And there's similar interest in Smith Falls. So we're sort [35:20] of sandwiched in between two growth areas. Smith Falls is growing at a more [35:25] normal pace and Campill seems to be on steroids and it's it's expanding uh its [35:32] its growth uh exponentially. So, you know, in a perspective county, I think [35:39] this information and projections along with the fact that we have a lot of flow [35:45] through traffic. So, there's going to be some need and uh identification on what [35:52] the county needs to do to support the smaller [35:55] village area in [clears throat] terms of county roads because the county roads [36:02] are essential to try and get that traffic moving forward and flowing out [36:08] so we're not uh sitting in long traffic jams. So that's the interest that I [36:13] would have at the county is to ensure that there's still that investment going [36:17] on. Yes, we have some potential. Yes, we're going to grow, but we need support [36:22] uh for other reasons as well. So I think that all that information should be [36:27] relative uh in the conversation that we're having at the upper tier in my [36:31] opinion. Yeah. Thank you. [36:36] Anything further [36:40] missing? Do you have anything further to add? [36:42] » No, I think I I believe the clarification is if we proceed in this [36:49] path, it does not commit us to >> moving forward with the growth [36:53] projections that are here. It's just it's just a way for us to commence the [36:56] study and use the data uh with the understanding that [37:01] it is just they are just estimates and possibilities and whether we even want [37:05] them or not, who knows? after we have the in public information sessions have [37:10] a better understanding of of the next steps. Is that is that basically? [37:15] » Yeah, it's it's just generally fair. Um I guess maybe a part I would add is like [37:21] when it comes to like communal water wastewater infrastructure while our [37:25] focus is a 20-year timeline, we typically don't bury this infrastructure [37:29] to last only 20 years. >> It lasts a lot longer. Mhm. [37:32] » So looking at a we'll call it aspirational growth is is beneficial to [37:38] help you align uh infrastructure projects to allow this. [37:45] » Yeah. So just uh I think for further thought is [37:52] just uh just add to what Miss Plumbing was saying a few minutes ago. I mean uh [37:59] whether we have to, we don't have to, what have you, we do have a situation [38:02] where we have a lot of infrastructure that needs to be renewed and uh we've [38:07] collected an enormous [clears throat] amount of data that tells us this and [38:11] downloading that to the current tax base is going to be extremely [38:16] challenging for the tax base. So growth is necessary in some form. How we better [38:21] how we manage that u will unfold as we move forward. But it also gives council [38:28] and the next council and council after that ideas where the the limited [38:33] infrastructure dollars that we're going to have should be invested so that we [38:37] are meeting the possibility of uh that growth and uh we're ready for it and [38:43] we're not overwhelmed by it. So I think uh [38:49] some kind of a strategic focus on what you've identified here is [38:55] is an absolute conversation that needs to happen at the table. [39:00] So, uh, and Miss Plumbley, you have no problem moving that, uh, including them, [39:05] uh, in conversations with the county so that we can get better [39:09] » alignment to understand because we we need the county to start [39:14] » putting infrastructure dollars on our county roads. [39:17] » This this is why this meeting is very timely because they are looking for [39:20] input. This is the kind of input that will be valuable moving forward. [39:24] » Yeah. because it is important because of the growth happening in Campville [39:27] because Campville will be absorbing a majority of that infrastructure growth [39:33] money through the counties in their areas with all the county roads they [39:37] have. So, uh I don't think uh we can afford to wait another 15 or 20 years [39:43] for to have our county roads u looked at. [39:48] So, if there's nothing further, I thank you for coming out making the [39:53] presentation. We look forward to your next presentation. And when can we uh [39:58] when are we going to receive you again? What was the October? [40:02] » Yeah, the next opportunity would be um end of October, beginning of November at [40:06] the public information center. >> Focus need. [40:09] » Yeah. And as councelor Gur pointed out that if the general public has any [40:13] comments or wishes to engage, they have the opportunity to that. All that [40:17] information is on the website, right? So we don't have to wait for the actual [40:20] public uh open house. you can uh pre-engage and and uh and move your [40:26] questions and hopefully get the answers that you're seeking. [40:29] » Deputy Mayor, go ahead. >> So, there is a motion to endorse [40:33] » the number in this report. >> Not there yet. [40:36] » Um once we get there, I would like to um first of all, I want to comment again [40:44] on those two parcels 13 and 14. um 14 in particular is affected by the [40:50] the flood plane. It's also affected by um required setbacks for the railroad. [40:57] So the the number of available units in those two parcels are going to be [41:04] lowered. Um and given that the report and the forecasts are for 20 years, I [41:11] would like us to consider removing 13 and 14. [41:16] um [clears throat] from the total so that it will be easier to align the this [41:23] number with what the county is considering. Um it's still a high [41:28] number. It would still demonstrate that we've got an enormous capacity for [41:34] growth whether or not it becomes in effect or not. Um, but I [41:40] would feel that those two parcels being so far out on the horizon that they [41:48] shouldn't affect our plans right now. Quite frankly, I find the five and the [41:53] 10-year plans to be pretty aggressive. Knowing the the background and the [41:57] history of how development evolves in Meritville Wolfford, it is quite slow. [42:03] Um, but I can I can appreciate that we want to do some planning a little bit [42:07] earlier rather than too late. [clears throat] And so I would put it to [42:13] council that we reduce um [42:18] the 10 to 20 forecast by removing parcels 13 and 14 from this particular [42:25] planning stage. [42:30] » So you're putting that question out there? [42:31] » I am. So thought is council. [42:39] » I have thoughts but I'll you get to go first. [snorts] [42:44] » Yeah. I would think by leaving it in there, it gives us a better opportunity [42:48] to pursue grants from the government as far as showing that we are a location [42:53] that has great growth potential and if we're going to expand that plant, um it [42:59] looks like we need to at some point anyway. So, um they would be much more [43:05] amenable to a grant to help us do that if uh it shows the projections are are [43:12] higher. [43:16] as a girl. [43:20] » Um either way, I understand um where Deputy May is coming from because the it [43:24] is more than 20 years. It's that's the cross-hatched [clears throat] ones are [43:29] 20 years plus. Um and and uh we want to look at it. I personally have a problem [43:36] with looking at a whole picture because once again this is not committing us to [43:40] anything. This is just looking forward in 30 years from now. Um, you know, [43:45] planners looking at least they have some kind of uh like there's plans and cities [43:50] all over that go for decades. Uh, so going decades ahead and I don't see a [43:55] huge problem with it, but I'm immunable either way. [43:58] M >> I I guess the main reason that I'd like [44:01] to leave it in is when you're looking at big picture and when the United counties [44:05] are looking at this big picture when they're trying to get their through [44:08] roads if they're ever going to re-evaluate how we're going to get [44:11] traffic around Marrickville. I think it would be beneficial to have that left in [44:15] there so they realize there is a potential there could be residential [44:18] areas over there as well. >> Okay. And I just want to remind council [44:22] that uh leaving the lands in doesn't mean we're developing it. that you [44:26] wouldn't be moving forward with that until you have secured infrastructure on [44:31] the north side. And that's in reality, I know there's some people [44:35] that don't want to hear that, but it's it's decades or so out. And you need to [44:40] have identified potential [44:44] uh within the municipality if you're going to go after uh provincial grants. [44:49] So provincial grants are based on what the cap what your possibilities are. So [44:55] if you remove your possibilities, you remove remove your opportunity for [44:59] grants. And I think this is an identified urban area, nothing's going [45:04] to happen there until the infrastructure actually goes across the river. And when [45:09] that does go across the river, it could be decades before anything happens. So [45:14] it's it's nothing that is going to be developed tomorrow. We're not going to [45:17] see all kinds of uh hi ho out there digging holes. It's uh decades away. and [45:23] and uh a master plan is an opportunity for councils to understand what the [45:29] future are going to be and where infrastructure dollars should be [45:33] invested for that future. So I I think we should leave it in. [45:40] » I I just want to address the fact that this plan has a a shelf life of 20 [45:45] years. So we would be looking at the lands all over again [45:52] probably 10 years down the road. Um so why build a plan now for things that [46:00] aren't going to happen is is my only concern. Um given the time span that [46:07] both the county and this report is looking at. [clears throat] [46:12] » Appreciate it. But I don't think it it's necessarily committing us to build a [46:16] plan. It's giving identity to what the possibilities are [46:22] in infrastructure needed in the future. And if those possibilities are still [46:28] there, it's like everything else. Every document is uh is uh comes up for [46:32] renewal and redisussion. We don't know what's going to happen 5, 10, 15, 20 [46:37] years out, but this this is what you do. You put a plan out. You look at [46:43] projections and possibilities and opportunities and that guides council [46:48] [clears throat] in how it's going to move forward. There's a lot of lands [46:53] that are already been given capacity. We're doing a lot of work on the system [46:59] to uh tighten up the system because it's [47:02] leaking. We know that. And as we move forward, uh we're going to need that [47:07] growth to help pay for that infrastructure uh renewal and upgrade. [47:13] So nothing's going to happen overnight. And [47:17] these projections are long-term as we've discussed a lot at the table here. It's [47:22] some plan that needs to be developed. We've asked JL Richardson to make those [47:26] projections for us. That's the I guess the gist of a of a master plan is to [47:34] make councils aware of where they should invest and what the possibilities are [47:38] for the future pretty much. [47:42] » Yeah. Okay. [sighs] So, I think everybody's still satisfied [47:46] with the way we're we're moving forward. So if there's nothing new or further to [47:51] add, I think what we'll do is uh uh we'll go in and and we'll read the [47:57] motion that the council of the corporation of [48:00] the village of Marville Wolfer received for information the master plan master [48:04] infrastructure plan population growth projection summary from JL Richardson [48:09] and that council endorses the growth uh projections as listed in the population [48:13] projection report prepared by JLR in con in consultation with the village [48:20] aqua staff dated July 22, 2026 for the use in advance of infrastructure master [48:27] plan. May I have a mover, please? [48:31] » Okay. >> No, we haven't we haven't done that yet, [48:33] council. So, you're going to move it? >> I'll move it. [48:35] » Second, please. >> I'll second. [48:37] » Moved and seconded. So, do we have any com further comments or questions from [48:42] staff or sorry, from uh members? None. So, I'll call the vote. All in favor? [48:48] All opposed. Scared. Appreciate it. Thank you very much. We [48:54] appreciate you coming out. So, um, looking forward to our next engagement [48:58] and conversation. Thank you. >> Thanks for having me. [49:00] » You're welcome, sir. Uh, we're going to move on to confirming bylaw 47, 2026 [49:05] that the [clears throat] council of the corporation of the village of Merville [49:07] Wolfer give first, second, third, final reading of bylaw 47, 20226 being a bylaw [49:11] to confirm the proceedings of council for the special meeting of July 28, [49:14] 2026. and further that authorization be given to the mayor clerk to sign coal [49:18] and place in the bylaw book for the municipality bylaw 47206. [49:22] May I have a mover please? Move. Thank you. Second, please. [49:26] » Second. >> Thank you. Call the vote. All in favor? [49:29] Carried. And we'll go on to adjournment that the council the corporation of the [49:32] village of meritable adjourn at birth please. [49:35] » 349. >> 349. [49:38] May I have a mover? >> I'll move it. [49:40] » Thank you. [clears throat] Second. Thank you. Call the vote. Call in favor.