[0:00] All right, thank you, everybody, for being here today [0:03] at the Metrolink board meeting. [0:05] Let me call the meeting to order. [0:07] Friday, July 24, 2026, 10:00 AM. [0:11] And first order of business is the safety briefing. [0:14] So, Hilary Konczal, Chief Safety, Security [0:18] and Compliance Officer, please come to the podium [0:21] and provide our safety briefing. [0:22] Good morning, vice chair, board of directors. [0:25] In the event of evacuation, we will collectively [0:30] walk out the room. [0:32] Just make sure there aren't any tripping hazards, chairs, [0:35] book bags, that sort of thing. [0:36] We'll walk out the entrance to the boardroom, [0:38] down the escalators. [0:40] The entrance to the building will turn right, [0:42] and we'll meet in front of the Metro customer service area, [0:46] where we'll take headcount and make [0:49] sure everyone is accounted for. [0:51] In the event of a medical emergency, [0:52] we do have an AED located outside of the security desk. [0:55] We have our LA County Sheriff's Department who will also [0:58] render aid and dial 911. [1:02] In the event of an earthquake, we'll [1:03] take cover under the benches and where we can [1:06] and wait for the rumbling to stop [1:08] to see if further evacuation is necessary. [1:10] And in the event of an active shooter, we'll deploy the run, [1:14] hide, fight tactic. [1:15] Thank you. [1:15] Very good. [1:16] Thank you very much. [1:17] Next item is Pledge of Allegiance. [1:20] We'll ask Director Michael Vargas to lead us today. [1:26] Thank you. [1:26] [INAUDIBLE] [1:32] I pledge allegiance to the Flag of the United States of America, [1:36] and to the Republic for which it stands, one nation under God, [1:41] indivisible, with liberty and justice for all. [1:50] All right, next, Madam Clerk, the roll call. [1:58] Director Spiegel. [1:59] I'm here. [1:59] Just-- whoops. [2:02] I'm taking my liberty. [2:03] Everybody's asking about the flowers. [2:05] It's not my birthday. [2:07] Darren, you want to explain where they're from? [2:10] Do I have to? [2:11] So, yes, we're recognizing Director Spiegel [2:15] for going above and beyond the call of duty. [2:18] We had a budget, audit, and finance committee meeting [2:20] a couple of weeks ago. [2:22] And we learned through counsel that-- and we had several board [2:27] members that were taking that meeting remotely outside [2:31] of our region. [2:33] So we were going to have difficulty getting [2:35] to a quorum of actually having a people here within the service [2:39] area of Metrolink. [2:41] So I reached out to Director Spiegel the night before. [2:46] And she was kind enough to change. [2:51] We're recognizing Director Spiegel [2:54] for going above and beyond the call of duty. [2:57] We had a budget, audit, and finance committee meeting [2:59] a couple of weeks ago. [3:00] There's two of you. [3:01] There's two of me. [3:02] One of me is enough. [3:05] It's coming from the control room. [3:07] OK, I think they've corrected it. [3:09] OK, so anyway, it's a thank you to Director Spiegel for joining [3:13] us, a meeting that she had not planned [3:15] on attending, to make sure that we could conduct the meeting. [3:18] So that's what is. [3:19] So thank you, director, in person. [3:21] So yes, in the room, in the region and-- [3:28] whatever she would like, it's on us. [3:31] OK, good enough. [3:32] Very good. [3:33] OK, continue, please. [3:35] Director Vargas. [3:37] Director Molina. [3:39] Second Vice Chair Trembley. [3:41] Director Engler. [3:42] Here. [3:43] Director Barger. [3:44] Here. [3:45] Director Najarian. [3:46] Here. [3:46] Director Sandoval. [3:47] Here. [3:48] Director Solis. [3:50] Director Ohlsen. [3:52] Director Allen. [3:53] Director O'Connor. [3:55] Director Camacho. [3:57] Director McCallon. [3:59] Director Wapner. [4:00] Here. [4:02] Director Dutrey. [4:04] Director Marquez. [4:06] Chair Chaffee. [4:08] Director Nguyen. [4:09] Director Go. [4:10] Here. [4:11] Director Tettemer. [4:13] Vice Chair Berkson. [4:14] Here. [4:15] We do have a quorum present. [4:17] Barely. [4:21] All right, very good. [4:22] Do we have any public comments for today's meeting [4:24] of items not on the agenda? [4:26] We do not have any requests to speak [4:28] for items not on the agenda. [4:30] We have a request to speak for four of our regular calendar [4:33] items. [4:34] And we have received a few written public comments [4:37] requesting that we maintain funding and do not [4:39] cut service that will be emailed to the Board after the meeting. [4:43] Very good. [4:43] So we'll go ahead and listen to the public comments related [4:46] to those items when we get to them. [4:49] And we will move to Item 6, Approval of the Consent Calendar [4:52] Items 11A through 11F. [4:55] Are there any items that need to be discussed? [5:01] Can I get a motion to approve? [5:03] Approve it. [5:04] And a second. [5:05] Second. [5:07] Right, all in favor, aye. [5:10] Opposed, abstentions. [5:12] I know that's not the way we normally do it. [5:13] But in my head, that's the way I like to do it. [5:16] I like to be awake when I'm having meetings. [5:19] So I make everybody do something and say something. [5:21] Anyway, it was a unanimous yes. [5:24] We will move to the regular calendar, Item 7A, [5:26] fiscal year '27 budget development update presented [5:30] by Tom Schamber, Chief Financial Officer. [5:33] Good morning, Vice Chair Berkson, members of the board. [5:37] On July 18, last Saturday, a proposed FY27 budget [5:42] was provided to the member agencies. [5:45] The budget, commonly referred to as scenario 4, [5:48] was based on maintaining the current level of service [5:50] for the duration of fiscal '27. [5:54] Over this week and next, I will hold meetings with each member [5:57] agency to review the budget and to answer their questions. [6:01] It is then up to the member agencies [6:03] to determine if there is consensus [6:05] to advance this budget to their respective boards for approval. [6:11] If consensus is not reached, the member agencies [6:14] will need to convene a meeting to discuss [6:16] an alternative scenario for development. [6:19] Next slide. [6:22] If consensus is reached to move the current budget forward, [6:25] there are two alternatives toward reaching budget adoption. [6:29] These alternatives were presented [6:31] to the budget, audit, and finance committee [6:33] earlier this month. [6:34] The BAF Comm voted to follow alternative one. [6:39] Alternative one would involve a special board meeting in August [6:42] to formally transmit the budget to member agencies. [6:46] In early September, another special board meeting [6:49] would be held in lieu of the BAF Comm to hold a public hearing [6:52] and adopt the budget. [6:54] This budget would take effect on October 1. [6:57] Under this alternative, no continuing resolution extension [7:01] would be required. [7:03] Next slide. [7:06] Alternative two would involve a special BAF Comm [7:09] meeting in August to review the budget transmittal. [7:12] The full board would hold a special meeting [7:14] in early September in lieu of the regularly scheduled BAF [7:17] Comm meeting to approve the transmittal. [7:20] This would be followed by a public hearing and adoption [7:23] by the full board at its regularly scheduled meeting [7:25] in late September. [7:28] The budget would take effect on November 1. [7:31] And in this case, a one-month extension [7:33] of the continuing appropriations resolution would be required. [7:37] The BAF Comm favored the alternative, [7:40] which didn't involve an extension [7:41] of the continuing appropriations resolution. [7:45] Each of these alternatives assumes [7:47] the current budget scenario is approved by consensus [7:50] in a timely manner. [7:51] Should there be a delay in the decision [7:53] to move forward with this scenario, [7:55] or if the budget does not have unanimous support, [7:58] additional time would be required [8:00] to identify a new scenario and develop another budget [8:03] for consideration. [8:05] This would require an extension of the continuing resolution, [8:09] which is the subject of the next item on today's agenda. [8:13] Next slide. [8:15] That concludes my report. [8:16] I'm happy to answer any questions. [8:18] All right, Catherine. [8:21] First of all, thank you for that. [8:27] I looked at the list. [8:28] What is the turnaround for the agencies [8:30] to get the information back to me? [8:32] And can it be extended? [8:33] And if so, do you have enough adequate cash flow [8:36] to cover any costs if we don't come up with finalization? [8:41] Yeah, so we're hoping for a two-week review period [8:44] before we hear back definitively from folks. [8:48] We do get some feedback, but we're [8:51] waiting for that official decision from each agency. [8:54] We do have sufficient cash flow. [8:58] We are finalizing MOUs with the member agencies [9:05] to get their first quarter payment. [9:06] So as yet, we haven't received first quarter money. [9:10] But we do need it urgently to sustain operations. [9:14] And then, Darren, is Metro working with you? [9:19] I mean, I'll be very transparent. [9:21] My goal is to make sure that we limit any cuts. [9:25] And so I want to make sure that Metro is working with you [9:28] and providing face time to go over scenarios. [9:35] Yes, I would-- all the member agencies are working with us. [9:37] We have different challenges in each of the counties [9:41] that have given us targets. [9:43] Tom will be meeting with LA Metro staff [9:46] Monday of next week-- [9:47] Tuesday of next week. [9:48] So we will have person to person conversations at that point. [9:52] And I would ask then if there are any problems or concerns, [9:59] you will alert us so that we can be on top of it with you. [10:04] Sure. [10:04] Absolutely. [10:05] Thank you. [10:05] Thank you. [10:06] All right, Tim, did you have a comment? [10:09] No. [10:10] William, you? [10:11] OK, anybody else? [10:13] Go ahead. [10:14] Yeah, thank you. [10:15] Just a quick question. [10:18] The continuing resolutions, if we [10:20] engage in more continuing resolutions, [10:22] is there a financial issue going forward? [10:24] Is there a danger that we're going to run [10:26] into spending more or less? [10:28] We would get a second quarter payment along [10:30] with that second continuing resolution. [10:32] So we would continue to operate at last year's funding levels [10:36] and get a second support payment for that quarter. [10:39] So no, there would not be any issue. [10:42] With one proviso, and that is that the member [10:46] agencies, when we build them, they pay us. [10:50] So that is out there. [10:53] And given the uncertainty of things, [10:56] in interest of full transparency, [10:59] there could be pushback. [11:01] We do know in the case-- correct me if I'm wrong, Tom, [11:05] that Orange County is giving us the number at which the target [11:10] reduction is, which is lower than last year's. [11:14] They're still paying. [11:15] It's just at a lower rate than what [11:17] would have been in the continuing resolution. [11:19] Is that a correct statement, Tom? [11:21] Correct. [11:21] So that said, at least we're getting something coming [11:25] through the door. [11:27] Karen. [11:28] And as I have said in past years that please notify us [11:35] as directors that if our agency hasn't paid, that we are [11:40] aware that we can help in getting that payment done [11:44] because sometimes, we just don't know [11:46] that the agency hasn't paid. [11:48] So I would appreciate all of us if our agency [11:51] hasn't paid that you notify us. [11:53] Yes. [11:54] Very good. [11:55] Thank you. [11:58] Warren. [11:59] Thank you. [12:03] So we told you very clearly that we [12:05] don't want to study any other alternatives, [12:08] that we wanted the current service level [12:10] to be the focus of the studies and the budget development [12:14] process. [12:17] That being said, because we have such a short timeline, [12:22] and in the event that there are some shortfalls in the revenue [12:28] contribution side or perhaps on the cost-cutting side as well, [12:34] I don't want to call it a secret plan, [12:36] but do you have a concept of a alternative to-- [12:46] Coming out of my pocket. [12:47] --I don't want to call it a plan B [12:49] because that goes against what we asked you to do. [12:51] We said there's only plan A. Are you ready, at that point, [12:55] to move quickly to develop different suggestions [13:01] to this board as to what we need to do to move forward? [13:04] We are looking at other savings opportunities because we-- [13:10] we are looking at other savings opportunities [13:13] that I will call also somewhat low-hanging fruit [13:15] to find savings to address the two counties that have given us [13:20] a target to try to aim for. [13:22] And we're working closely with both counties [13:25] on that to where we help sweeten the pot at Metrolink, where [13:32] there might be a few dollars found someplace else [13:34] where we find some other savings in our operations. [13:37] So we do have that. [13:38] The only question will be, does that get us far enough? [13:41] And we are looking deeper into those [13:45] because we do know we have to focus on particularly the two [13:48] counties that gave us a target. [13:50] So yes, we are working on stuff behind the scenes, [13:54] given what we've heard at least as initial feedback. [13:57] And obviously, the constraint is there [14:00] isn't going to be much time to go through that. [14:02] So you know that. [14:04] I mean, I'm not telling you anything new, [14:06] but I'm just raising that out so everyone [14:08] is-- we are doing what we can to make [14:11] sure we're as efficient as possible to the point [14:14] where, again, we are doing our own revenue forecast. [14:17] We're not going out to-- [14:18] we've modified that so that we can keep this streamlined. [14:21] All right, thank you very much. [14:24] All right, any other comments? [14:25] I just want to-- [14:26] Go ahead. [14:27] I just want to add to that that we voted for our budget CTA. [14:32] So we're pretty adamant on those numbers. [14:35] I don't know how much flexibility we'll have. [14:38] So I think it's really important that we do meet those targets [14:41] that we've been given. [14:42] And if there is going to be a plan B, that it basically [14:45] is plan A at this point, right? [14:48] So I just want to make sure that that's understood. [14:51] All right, very good. [14:52] And if I can just ask, I believe the new budget [14:54] was provided to the member agencies a week or last weekend. [14:59] And I didn't study it myself. [15:04] But I've relied on some others that are the professionals. [15:08] And it appears to them that Orange County still [15:12] has a higher than what their target was by some [15:16] six or something million, which just sends a flag out [15:22] to me saying, all right, well, if we're not [15:24] at that level with this plan, option 4, what are we doing? [15:28] A 4.1 and figure out if there's a way to somehow get them [15:33] to where they need to be while not sacrificing service [15:37] throughout the rest of the system? [15:40] Vice Chair Berkson, I only say, give us a chance to work it out. [15:44] I think we got some things happening. [15:46] In fact, I presented to the CEOs a week ago an option [15:53] where something we've never done before. [15:55] We receive on an annual basis a funding source called state rail [16:01] assistance. [16:03] We normally use it because it's a volatile number. [16:05] It's not much, usually $5 to $6 million. [16:07] We usually use that to match capital [16:09] grants and that kind of thing. [16:10] It's just because it's not something [16:12] that you could sustain through operations. [16:15] But we did receive a bigger bump in FY25-26 of $9.3 million. [16:21] And what I shared with the CEOs is [16:23] that I would be prepared to recommend to this board [16:26] that we would take that full amount of $9.3 million [16:29] to offset some of those numbers. [16:31] So the numbers that the staff has seen [16:34] does not include what I shared with the CEO. [16:38] So 9.3 in our challenge does not go very far, [16:43] but it does hopefully soften the blow [16:46] and show the commitment at Metrolink of what [16:48] we're trying to make happen. [16:50] All right, very good. [16:51] Any public comments on this item? [16:53] We do have one request to speak-- [16:55] All right. [16:56] --from Adriana Rizzo. [16:59] Welcome. [17:02] Hello, everybody. [17:04] My name is Adriana Rizzo, representing [17:06] Californians for Electric Rail here from Riverside. [17:09] Really happy to see that we're getting close to a budget. [17:12] And happy to see that the more severe service cuts [17:15] are mostly off the table. [17:18] I just want to emphasize again the need [17:19] to avoid all service cuts, including the temporary March [17:23] cuts, which we have seen ridership growth stagnate. [17:27] And I know several people who have stopped using Metrolink [17:30] for certain things because of the last eastbound [17:34] 91 train of the day has been eliminated, just as an example. [17:39] One opportunity for additional revenue that I don't think [17:41] has been explored yet is TDA funds, the Transportation [17:44] Development Act. [17:46] Metro yesterday voted to allocate $35 million [17:49] in money intended for transit and cities [17:53] in the Antelope Valley line. [17:55] It isn't enough to fix Metrolink's operating deficit. [17:58] I think this needs to be looked into further. [18:00] And I would urge all of the member agencies, not just Metro, [18:03] to avoid certifying unmet needs when [18:06] that funding could potentially be used for Metrolink. [18:10] I also want to emphasize the importance [18:12] of continuing to adhere to Metrolink service development [18:14] plan. [18:15] Are we still on track for 30 minutes San Bernardino line [18:17] service by 2029? [18:20] As we think about the future, this board [18:23] needs a plan for how can we continue to fulfill these plans, [18:27] fulfill the service benefits promised by the score [18:31] program, which we've invested hundreds of millions of dollars [18:36] in state money for and ensure that those investments don't [18:39] go to waste by continuing to plan for increased service [18:43] and deliver a better experience for riders. [18:46] Thank you. [18:47] All right, very good. [18:48] Thank you for that. [18:48] And this item was received and filed. [18:50] So unless there's objection. [18:51] Mr. Chair. [18:52] Yeah, Allen, go ahead. [18:53] I just want to make sure-- [18:54] I know the focus right now is what Orange County and LA [18:57] County want to do. [18:58] But you can't forget about the other three counties. [19:01] Our commitment may change depending [19:02] on what everybody else does. [19:04] So you have to make sure that you [19:05] stay aware of what the other counties are deciding to do. [19:08] Don't go in with assumptions that everyone's [19:10] remained the same. [19:11] We just have to worry about what the other counties are [19:13] going to do because it may not be accurate. [19:17] Well, I agree because Riverside County [19:19] wanted more service this year, not less service. [19:22] So, I mean, and willing to pay the price. [19:26] But of course, our lines go through either Orange County [19:29] or LA County. [19:29] So we all have that challenge. [19:32] And hopefully we can get to that point [19:34] where everything works out. [19:36] So we will receive and file that and move to Item 7B, [19:40] approval of an extension for the continuing appropriations [19:43] resolution for fiscal year '27, again, [19:45] presented by Tom Schamber, Chief Financial Officer. [19:48] Good morning again. [19:49] I just went over the status of the FY27 budget. [19:54] It was distributed to the member agencies on July 18. [19:57] As I mentioned, there are two pathways [19:59] towards adoption, which are dependent on the timing [20:02] of key decisions and the direction of the board. [20:05] I presented two alternatives, which [20:07] both assume that the member agencies approve advancement [20:10] of the currently proposed budget. [20:13] One pathway avoids the need for an extension [20:15] of the continuing appropriations resolution. [20:18] The second pathway requires a one-month extension. [20:22] The third pathway, which would arise if the member [20:24] agencies determine that a new budget scenario should [20:27] be developed, would require additional time for agency staff [20:30] to complete their work. [20:32] Exactly how much time cannot be determined at this time. [20:35] It will depend on the timing of the decision [20:38] to pursue another scenario, the time taken [20:40] to finalize assumptions for that scenario, [20:42] and the timing of future BAF Comm and board meetings. [20:47] Next slide. [20:49] We are recommending approval of a three-month extension [20:52] of the continuing resolution until December 31 [20:56] for the Metrolink and Arrow operating and capital budgets. [21:00] The budget will be developed as quickly as possible. [21:03] And it is possible that a budget can be adopted before then. [21:07] This extension is a precaution in light of uncertainty. [21:10] And it also takes into consideration the board calendar [21:12] for the remainder of the year. [21:14] Next slide. [21:16] That concludes my presentation. [21:17] I'm happy to answer any questions. [21:19] All right, very good. [21:20] Comments, questions. [21:21] Karen. [21:21] That is with the caveat, as Mr. Head Honcho here said, [21:29] that we would continue to make our payments, correct? [21:32] Correct. [21:33] So that has to be part of this, that we continue [21:36] to make our payments of last year's amounts [21:39] until the resolution of what we're going to end up doing. [21:43] Correct. [21:43] OK. [21:46] Allen. [21:47] Thank you, Mr. Chair. [21:48] SPCT stands ready to support the continuing resolution. [21:51] But we are asking-- we're ready to do [21:53] the budget for the airlines. [21:54] We'd like to see that come back to the board for approval. [21:59] Understood. [22:01] So in this case, that would be a modified-- [22:06] the recommendation would be an amendment [22:08] to the staff recommendation that Arrow comes back at the earliest [22:14] possible time, and that the continuing [22:17] resolution for Metrolink proper would proceed as recommended. [22:23] OK, any other comments? [22:27] Do we have any public comments? [22:30] We do have a request to speak from Adriana Rizzo. [22:33] OK, welcome back. [22:39] Hello, everybody. [22:40] First, I want to say that I support extending the continuing [22:45] resolution and urge the board to vote yes on this item. [22:48] I think it's important insurance in case member agencies [22:51] are uncooperative. [22:53] But I think the fact that we're in this situation where [22:56] we potentially won't have a budget until as late as [22:59] December, halfway through the fiscal year, [23:02] is a symptomatic of deep dysfunction within Metrolink [23:07] governance. [23:09] The JPA structure of Metrolink requires cooperation. [23:12] But what we've seen this year is the opposite [23:14] of that, where we can't even get agencies to agree on [23:18] if we should follow our own service development plan, [23:20] if we should have more or less service. [23:23] And I think that this crisis highlights a need [23:27] for deeper structural reform. [23:29] In particular, most urgently, I would [23:33] urge the Metrolink to explore a permanent, sustainable, [23:39] additional source of operations funding, [23:42] such as a new regional tax measure that [23:46] is not dependent on the member agencies. [23:51] Really, we need a source of-- [23:54] all of this complicated process of getting [23:56] all these different actors to approve a budget [24:00] is just really failing to deliver [24:02] the service, a frequent, reliable service [24:05] our region needs. [24:07] And we need to think bigger, and particularly [24:12] with the need for a funding source that [24:14] is controlled by the Metrolink board [24:16] and not reliant on so many different actors. [24:21] I support Metrolink's move to find more state money. [24:25] But for the last five years, we've [24:27] really not seen interest from the state [24:29] in sustained, reliable operational support. [24:34] And I think that's going to continue [24:36] to be a challenge until we have more statewide reforms that [24:42] stabilize the state budget from year to year. [24:45] And so I would really encourage the board [24:46] to look regionally and think about what we can do here [24:52] in Southern California to strengthen Metrolink [24:57] as an agency and make it less a everybody's last priority. [25:05] Thank you. [25:06] Very good. [25:07] Thank you. [25:07] Appreciate your comment. [25:09] Any other comments from the committee? [25:13] Go ahead. [25:16] We just want to make sure that even though it looks like we're [25:19] going to try to get more time on this, [25:22] we want to keep working towards the fact [25:25] that it's a difficult problem to solve, [25:28] but it's also just a math problem. [25:31] So we have the variables defined. [25:33] Where else can we pull levers from [25:36] to get this to where we need to be? [25:38] The issue for us is we've spoken our levels that we [25:45] were able to fund to our tax dollars, [25:48] M2 tax dollars allocated to this so [25:50] that we can continue to service at the time we [25:54] need it to keep going to. [25:57] So I urge that we continue to keep working together [26:00] and just do as much as we can to get there. [26:04] The sooner, the better. [26:05] I think delaying this further just puts us [26:08] in a precarious situation towards-- [26:11] to what end? [26:12] What if December 31, we still don't [26:15] have all the full solution? [26:16] So with that said, just want to keep that in mind [26:21] that it's a everyday problem that we [26:23] need to solve for the riders. [26:27] Karen. [26:28] I definitely agree that if we can't by December 31, [26:34] there's just not going to be a solution. [26:36] I'll be quite frank. [26:37] I appreciate LA stepping up and reconsidering and working. [26:40] I just hope Orange County, I know you're [26:43] saying you're hard cut and dry. [26:45] But if LA is stepping up, I hope that you can maybe reconsider. [26:50] And we realize when it cuts. [26:52] But you made a comment about constituents and ridership [26:56] and wanting to help them. [26:59] That's not going to happen in doing cuts. [27:03] All right, Ara. [27:04] And I do want to, from the LA Metro side, [27:08] express our deep appreciation for our other counties, [27:14] for San Bernardino, Riverside, Ventura. [27:17] We hope that you remain firm in the commitments. [27:20] We understand there's budgetary pressures, but we're all in this [27:24] together. [27:25] And we're only as strong as our weakest link. [27:30] We're competitive. [27:31] Good, no, I know. [27:32] I mean, I appreciated it. [27:34] [INAUDIBLE] [27:39] We're all. [27:40] I think we're all-- [27:41] And in that corner. [27:43] So thank you for working with your boards [27:47] and maintaining the level that you have. [27:50] Others of us have some different issues [27:52] that we have to work through. [27:54] And everyone has a different row to hoe, I guess. [28:00] We all have different things that are coming at us. [28:03] Ours is a smaller amount, but we have less coming in. [28:07] So [INAUDIBLE] just we all have that same commitment. [28:11] I'm just using the word commitment [28:12] now from a monetary amount because you can't compare. [28:16] You guys are [INAUDIBLE]. [28:27] As we talk about this, I wanted to make sure [28:31] that staff is engaging with the member agencies [28:34] because we're going to get through this budget. [28:37] And it's already going to be time to start the next one. [28:40] And before we conclude, have we had discussions [28:46] with other member agencies to determine whether or not [28:49] they're going to be pulling any additional funding [28:51] for next year's budget? [28:53] I mean, these are things that are coming up quick. [28:55] So we can't wait till the last minute. [28:57] That's what got us in this position [28:59] because we found out at the very end of the fiscal year [29:05] that all of a sudden, not just one but two counties [29:08] needed to pull back. [29:09] And that created a major race to try to get a budget that worked. [29:15] Well, what happens next year if we know ahead [29:18] of time that we're going to have additional constraints? [29:21] We need to start building that in. [29:24] So, Vice Chair Berkson, I think one [29:27] of the things we are learning from this year [29:29] is we are in a sort of a reset of our budget process. [29:32] We had a real whiff, to a certain degree, [29:35] on the budget process last time because we anticipated more fare [29:38] revenue. [29:39] Again, this is not just a member agency challenge. [29:41] We didn't get fare revenue that we were expecting. [29:44] So that was 50% of our challenge. [29:47] We now know where we stand as it relates [29:49] to ridership and revenue. [29:51] We're in a much better place. [29:53] We know where our escalators are and our contracts. [29:57] We also know, at least from the one letter from Los Angeles, [30:01] from LA Metro, that the target was for next year [30:04] and then flat for three years after that. [30:11] Our delivery of our service, that [30:13] is not going to go down over those period of years. [30:19] We have various obligations to do that. [30:22] So our next year will be as difficult, if not more, [30:29] because, again, I mentioned the 9.3 that we're [30:32] prepared to put on the table, that is not [30:35] going to be a source that is going [30:37] to be reliable or sustainable. [30:39] So we are going to have to wrestle with that issue, which [30:42] is why it has been so critically important for us to continue [30:45] to lobby in Sacramento for state support. [30:49] And I mean, I don't know how we get [30:55] there absent the targets that have been presented [31:01] to us from member agencies. [31:03] So we should expect something as challenging next year [31:10] as we are dealing with this. [31:12] We will know it sooner, though, to answer your question. [31:18] We will know it much sooner. [31:20] All right, well, my goal, obviously, in my head [31:22] is let's not have to have any continuing resolutions [31:25] for next fiscal year. [31:26] Let's get it done on time knowing [31:29] where we're at this year. [31:31] So all right, this is an action item. [31:33] So the action item is asking for a three-month continuing [31:37] appropriations. [31:38] Do we have a motion for that? [31:40] With the proviso on the Arrow, that would not require that. [31:44] So just make sure that the recommendation is modified [31:47] to that or it's an amendment. [31:51] Second. [31:52] I second. [31:53] All in favor, aye. [31:56] Opposed, abstention. [31:57] Opposed. [31:58] Opposed. [31:59] So motion carries. [32:00] All in favor minus one. [32:04] All right, with that, we move to Item 7C, internal audit, [32:09] proposed fiscal year 2027 annual audit plan presented [32:12] by Elisabeth Lazuardi, Director of Audit. [32:15] Good morning. [32:17] I'm reporting on Item C. It is recommended [32:20] that the board approve the proposed '27 audit plan. [32:23] Next slide, please. [32:25] The internal audit charter requires the internal audit [32:28] department to submit an annual audit [32:30] plan to the board each year for approval. [32:33] The five-step process we used to develop the annual audit plan [32:37] is summarized here. [32:38] Next slide, please. [32:40] This slide highlights our newly proposed audit. [32:44] Next slide. [32:46] And we carried forward a few audits. [32:48] We started in fiscal '26, which we will complete in fiscal '27. [32:53] Following board approval, we will provide the board [32:56] with the status of the audit plan on a quarterly basis. [32:59] At the budget audit finance committee meeting on July 10, [33:03] in response to Director Tettemer's request for an update [33:08] on process improvements related to past challenges [33:11] and mechanical failures, management [33:13] will provide the board with a quarterly report [33:16] on these areas going forward. [33:18] The first report will be in October. [33:21] Next slide. [33:23] And this concludes my item. [33:24] Happy to answer if you have any questions. [33:26] Very good. [33:28] Comments or questions about the audit report? [33:32] So we did bring something up at our board briefing [33:35] yesterday in regards to possibly talking [33:39] about adding another item to this list, [33:42] but wanted to just bring that to the board for consideration. [33:47] With the number of issues that have been publicly [33:53] blasted about Metrolink with trains [33:56] and having the mechanical issues we had earlier this year [33:58] to the one Saturday where, I don't know, [34:01] between 150 and 500 stranded people [34:04] in the blazing sun, fire department supplying them [34:08] water and things like that. [34:10] And some had heat stroke or whatnot. [34:13] Obviously, the conversation basically [34:18] is about whether or not we add an item to the audit plan [34:22] to basically determine if our response teams are [34:28] the ones driving the regular little Metrolink [34:30] cars that might have water in the back or the backup trains. [34:35] Are they doing what we need them to do? [34:37] Do we have that plan in place? [34:39] Is the checklist there, and they know what to do and when? [34:43] I'm not sure what the feeling is here. [34:45] But I think that, at least in discussion with our board [34:51] briefing, it seems like that might be a good item [34:55] to add so that we can at least make sure that the public is [34:59] being treated as quickly as possible [35:02] and the people that are representing [35:04] Metrolink are getting out there as fast as they're supposed to. [35:08] So I'm not sure if we've ever had an audit like that. [35:13] Not that I recall myself, but I wanted just to bring it out [35:18] and say that is something that I was thinking we might want [35:21] to engage with if there's-- [35:24] Just a comment. [35:25] I think that's something really important that we look into. [35:27] I'm not sure it's quite an audit kind of function. [35:29] Perhaps it's just something we have there and take a look at [35:32] and bring it back. [35:32] Mr. Vice Chair, I was going to suggest that this board has [35:37] probably not been briefed in some time about how we handle [35:39] those types of actions. [35:42] Between our safety security and compliance team and our customer [35:45] experience team, we can put together [35:47] a presentation for a full board meeting that [35:50] lays out because we have a long list of what's [35:54] supposed to happen. [35:54] Does it always work perfectly? [35:58] But we do have a plan in place. [36:01] So if we can do that and if we encounter a need potentially [36:05] in the future, how it could be treated through Liz's team, [36:09] that may be something. [36:10] But maybe we get a bite at the apple [36:12] from a management perspective on that one as well. [36:14] I have no issue with that myself. [36:17] Catherine. [36:18] So is there a reason-- [36:21] and this may be what you're asking-- [36:22] why the materials and management maintenance of equipment unit [36:27] was left out of the audit plan? [36:30] As indicated in our report, we have a table [36:33] identifying areas of high risk. [36:36] Definitely, that's one of the high risks that were not [36:39] selected for an audit for the fiscal [36:42] '27, partly because as management is working on it, [36:46] they also have their internal working group looking into this [36:50] for process improvement. [36:52] And again, as I already mentioned at the budget audit [36:57] finance committee meeting, during the discussions, [37:01] Director Najarian and Director Tettemer [37:03] obviously raised that issues. [37:05] And then you feel free to chime in. [37:08] But it was agreed that an action item of management [37:14] will provide quarterly report on those areas. [37:17] OK, because given that that seems [37:19] to be the equipment failures. [37:27] So we have new leadership over the area that deals [37:32] with our parts and operations. [37:34] They're stepping up. [37:35] We have this internal working group. [37:37] To be real blunt, the locomotive that you see in front of you [37:44] on these screens, the 40 of them, [37:46] they have had a reliability. [37:48] We are actually getting the parts we [37:50] need when we do have failures. [37:52] The situation that occurred on Saturday [37:54] was something that we've become, unfortunately, accustomed to. [37:57] They just happen to be a surprise every time [37:59] it happens because you don't know [38:00] when a fuel manifold is going to crack [38:02] and renders the equipment completely unusable. [38:07] We have fuel manifolds in inventory. [38:10] We have spider shafts in inventory. [38:12] So we know what our problem parts are. [38:14] We just don't know when they're going to fail. [38:16] And that is a problem with this particular locomotive [38:20] that I have now determined to be a DeLorean as we [38:26] struggle with some of the reliability challenges. [38:29] But the team is working on the parts of material side. [38:34] And we're trying to come up with ways [38:37] to reduce even the part failure issue [38:40] with the various manufacturers. [38:42] Thank you. [38:42] Thank you. [38:43] All right, any other comments? [38:47] All right, this is an action item to approve-- [38:50] oh, public comments. [38:51] Do we have a public comment? [38:52] OK, now it's an action item. [38:54] Do we have a motion to approve the audit [38:57] plan as is in the staff report? [39:00] Second. [39:01] All right, all in favor, aye. [39:03] Opposed, abstentions. [39:06] Not a lot of yeses, but no no's. [39:10] Item 7D, contract number SP645-27, [39:14] customer service center recommendation to award 22nd [39:17] Century Technologies, presented by Rachel Chaires, [39:22] Senior Manager, Customer Relations, and Tammi Phillips, [39:24] Senior Contract and Compliance Administrator. [39:28] Good morning, Vice Chair Berkson, member of the board. [39:31] Next slide, please. [39:33] Metrolink's customer service center handles over 500,000 [39:37] customer contacts each year, providing real time information [39:40] on schedules, fares, connecting transit, [39:43] and assistance during service disruptions. [39:45] In addition to supporting marketing campaigns, [39:47] special trains, and mobile app issues, [39:50] live agents are available via phone and text [39:52] during designated business hours, seven days a week. [39:55] And recorded information is available 24 hours a day. [39:58] Next slide, please. [40:01] This procurement will ensure uninterrupted, high-quality [40:04] customer support for riders when the current contract expires [40:07] in November 2026. [40:10] We began with a request for information [40:11] in October that drew 33 responses-- [40:14] I'm sorry-- that drew responses from 33 firms, [40:18] giving us strong insight into modern customer service [40:20] tools and staffing models. [40:22] The request for proposal was issued in March [40:24] and generated strong industry interest. [40:27] Of the 83 firms that downloaded the solicitation, [40:30] 25 attended the pre-proposal conference. [40:33] Staff answered 348 follow-up questions [40:36] and ultimately received 11 proposals. [40:38] Eight were responsive, and six advanced to interviews [40:41] after meeting the technical threshold. [40:44] Proposals were evaluated on capabilities, staffing, [40:47] operations, and price. [40:49] After combining technical and cost scores, [40:51] 22nd Century Technologies Inc received the highest overall [40:54] ranking. [40:55] Their proposal demonstrated strong operational readiness, [40:59] a modern technology platform, and a staffing approach [41:02] that aligns with Metrolink's performance expectations. [41:05] 22nd Century has been in business for 29 years as an IT [41:08] services integrator and has 12 years of experience operating [41:12] customer service centers. [41:14] The company is headquartered in McLean, Virginia, [41:17] with an existing customer service [41:18] facility in Dallas and the capability [41:20] to establish a local operation if needed. [41:23] They currently employ more than 350 trained customer service [41:27] agents supporting federal, state, and local government [41:30] clients, including several public transportation agencies. [41:35] To support a seamless transition, [41:36] they also intend to recruit experienced staff [41:39] from the incumbent contractor. [41:41] Next slide, please. [41:43] Staff recommends awarding a three-year contract to 22nd [41:46] Century Technologies Inc with two one-year option periods [41:50] for an amount not to exceed $8.5 million and authorizing the CEO [41:54] to exercise the option periods at the authority's discretion. [41:58] Next slide, please. [42:00] This concludes my report. [42:01] And I'm happy to take any questions. [42:03] All right, very good. [42:04] Karen. [42:09] Is the current company OK with 22nd Century recruiting [42:19] their folks? [42:21] That is a standard. [42:23] When there's a transition of customer service center [42:27] contracts, the new contractor will reach out to the incumbent [42:31] to determine if there is staff that [42:33] is interested in transitioning over. [42:35] And where is our incumbent based? [42:38] In Brea, California. [42:39] So the new one is in Virginia. [42:44] Yes, they're headquartered in Virginia. [42:47] And there doesn't seem to be a problem because it's straight [42:50] over the phone customer service? [42:52] No, we have several SOPs that we'll be sharing. [42:57] We'll be working closely with them [42:59] on developing their training curriculum. [43:03] They also operate customer service centers [43:07] for transportation agencies across the country. [43:10] So we're really confident that they [43:12] will be able to support us successfully. [43:15] OK, thank you. [43:17] Allen. [43:18] Thank you. [43:18] Did you have the opportunity to actually visit their customer [43:20] service center to see how it operates? [43:22] I have not. [43:24] You think that that might be advisable? [43:27] Is that something you would do normally or not? [43:33] Historically, I mean, Director Wapner, that's not something [43:37] where we've gone to those. [43:39] Not to say it's not a reasonable idea. [43:42] That's not been a practice of Metrolink's in the past [43:44] to go and visit those centers. [43:48] We generally take the references we have from those agencies [43:53] that they recognize that they currently perform work [43:55] for as sufficient for our ability [44:00] for them to perform on our contracts. [44:02] I'm just wondering if sometimes the flexibility of that customer [44:05] service center, are they really using folks that are there [44:08] or they're using the address and there's other folks working [44:10] somewhere else in the world? [44:11] How do we know that? [44:12] I'm sorry. [44:13] Can you repeat the question? [44:14] How do we know that the folks that are working for them [44:17] are actually working within the United States [44:19] and they're not using folks in other countries [44:21] to answer the phones? [44:22] Thank you for the question. [44:23] They have confirmed that their entire staff is located [44:26] within the United States. [44:30] OK, any other-- Tim. [44:33] Yeah, thank you. [44:35] You had mentioned that they're based in Virginia. [44:38] They have a center in Dallas. [44:41] And then you also said, if I understood correctly, [44:43] that there is the possibility of a local option. [44:47] Maybe you didn't phrase it that way. [44:49] What triggers that? [44:50] Because what I assume to be a local option [44:52] is California or somewhere in Southern California. [44:56] Can you explain that? [44:57] Yes, they indicated that if we require them to be local, [45:02] that they can secure a facility here and set up operations [45:06] locally. [45:07] Just out of curiosity, is there a reason [45:09] why we wouldn't do that, given proximity? [45:13] Is there additional cost? [45:17] It's close by. [45:18] We can go see it. [45:20] Just any thoughts on that insight would be appreciated. [45:23] Yeah, Director Sandoval, and I don't know, Tammi or Rachel, [45:26] if there's an added cost for them to tool [45:30] up a facility in Southern California [45:32] that we would then be on the hook for. [45:34] So much of what customer service does [45:36] happen is almost by its very nature is kind of remote. [45:40] But it is nice to be able to go kick the tires locally [45:44] if we can. [45:45] Can you answer that question, Rachel or Tammi? [45:47] Is there additional cost to have it or Sabrina who's stepped up [45:49] behind you, just so you know. [45:52] They did not indicate an additional cost. [45:55] But I can certainly find out and get back to you. [45:57] And maybe one of the questions is [45:59] this is a three-year contract, two additional years. [46:05] Maybe through our process of just monitoring, [46:11] perhaps we go back to them and say, listen, we really [46:13] would like for you to bring a local component here. [46:16] Certainly, it could mean some jobs, [46:17] albeit probably not a lot of positions, but just something [46:21] to be aware of. [46:23] Good point. [46:23] All right, any other comments, questions? [46:26] Any public comments? [46:29] All right, this is an action item asking for the contract. [46:33] Do I have a motion to approve? [46:35] And do I have a second? [46:36] All right, all in favor, aye. [46:38] Opposed, abstention. [46:40] Motion carries unanimous. [46:42] Onto 7E, contract number C3167-26 SCORE Marengo [46:50] and Rancho siding extension projects, [46:53] construction recommendation to award Granite Construction [46:55] Company, presented by Katy Thorpe, [46:58] Principal Engineer Capital and Third Party Construction. [47:01] Director Berkson, before Katie starts, [47:04] this is a really big deal. [47:06] Go ahead, Katy. [47:08] No pressure. [47:09] Good morning, vice chair and members of the board. [47:11] Next slide, please. [47:13] Authority proposes to extend both the existing Marengo [47:17] and Rancho siding tracks on SCRRA's San Bernardino line [47:21] to improve frequency and flexibility of future service. [47:24] Next slide, please. [47:26] Invitation for bid was released on February 6, 2026. [47:30] We received four bids. [47:31] And the lowest was 39% over the designer's independent cost [47:34] estimate. [47:36] Authority staff analyzed the bids alongside the designer [47:39] and determined a few key factors in the bid. [47:42] And independent cost estimate discrepancy were as follows. [47:46] The designer's escalation factors were too low. [47:49] Material cost escalations have been particularly volatile [47:52] in recent years, with some track and signal components doubling [47:56] in cost. [47:58] Lastly, due to the number of current and pending construction [48:00] contracts in the Southern California area-- [48:03] sorry here echo-- there is a concern amongst contractors [48:06] regarding labor availability and potential labor shortages, which [48:10] may lead to premium pay in order to obtain qualified workers. [48:15] After review, Granite Construction [48:17] was determined to be the lowest responsive and responsible [48:20] bidder. [48:20] Next slide, please. [48:23] It is recommended that the board authorize the CEO to award [48:26] contract number C3167-26 for the SCORE Marengo and Rancho [48:31] Cucamonga siding projects to Granite Construction [48:35] in the amount of $51,502,175, plus a 5% contingency, [48:41] bringing the total not to exceed amount to $54,077,283.75. [48:49] Next slide. [48:50] Thank you. [48:51] All right, very good. [48:53] Comments or questions. [48:55] That $0.75 is important. [48:59] It just sounds like a 5% contingency [49:01] is kind of low when it comes to a construction project. [49:05] Yeah, 10% is typical, but, I mean-- [49:08] I just don't look for it a lot of change orders, that's all. [49:12] I hope so too. [49:14] Any public comments on this? [49:17] We do have a request to speak from Adriana Rizzo on this item. [49:24] Hey, everybody. [49:25] This is really exciting. [49:27] I'm very happy to see that these projects are [49:30] moving forward and getting close to the construction phase. [49:32] It's going to be a game changer to have 30-minute service [49:36] on the whole San Bernardino line and hopefully have that be [49:39] a little more reliable than we've been seeing with [49:42] the attempts to do 30 minutes for part of it. [49:45] So this is really great. [49:47] I have a concern, though, that this [49:49] is one of the only SCORE program projects that [49:53] seems to be moving forward in anywhere near on time. [49:57] I mean, we were supposed to have SCORE phase 1 done by 2028 [50:01] now, right? [50:02] And some of these projects have been indefinitely canceled. [50:07] They're indefinitely delayed like the Serra Siding. [50:10] Others of these projects like the Balboa Double [50:14] Track, some other projects in LA County [50:16] have been delayed like 10 years. [50:19] I think some of the AVL projects are not supposed to be complete [50:23] until the late 2030s, based on the latest update I saw. [50:27] And this is really concerning for riders [50:30] and for people who want to see a better, more [50:36] serviceable Metrolink system. [50:40] I'm wondering, has the-- [50:42] first off, it's quite difficult to actually find information [50:47] about the status of these projects. [50:49] I'm wondering if the SCORE website [50:52] page could be updated more frequently [50:54] to provide more information about these projects. [50:58] And secondly, I'm wondering, has Metrolink [51:00] done any kind of comprehensive audit [51:02] to study the reason for why there's so many delays? [51:07] This would be helpful for us as advocates to identify ways [51:11] where we can push for legislation or other changes [51:16] that could help us deliver some of these projects faster. [51:20] So we want to see these projects on time, on budget. [51:23] But that's not really what's happening right now. [51:25] So thank you. [51:27] All right, thank you very much. [51:28] Comments from the board. [51:31] Yeah, what were you so excited about this item? [51:36] Because this is one of-- as actually the speaker just [51:40] mentioned, we have not had many SCORE projects [51:43] get out of the gate. [51:44] And this project on the San Bernardino line, our most used [51:49] line will give us-- [51:52] awarding this contract today, having the funding in place [51:55] means that this project will be done in advance of 2028 [51:58] in the Olympics, which will give us the ability to run 30-minute [52:02] bidirectional frequencies on that San Bernardino line. [52:06] So it is setting us up for success. [52:09] And it's just great to finally get that project out the gate. [52:14] You look like a little kid looking at the candy bar. [52:16] You were just-- did I miss something? [52:19] You can turn to Katy and Justin and the team on this. [52:23] These are long processes to make happen. [52:27] And I will say that the fact that we had the budget [52:33] bust on the independent cost estimate was like, OK, [52:35] how are we going to track down the money? [52:36] And we now have two different sources [52:38] to cover that, the delta. [52:39] So we're just excited about getting shovels in the ground. [52:44] So, Darren, can you-- [52:46] so going back in my dusty memory bank here, [52:50] SCORE program, if I'm not mistaken, [52:52] was supposed to be a $10 billion-- [52:56] it was set up to be $10 billion of funding coming in [53:00] and doing all these programs. [53:02] So the speaker that mentioned so many have been canceled [53:06] or postponed, is that because-- [53:09] I don't know what the exact amount we brought in. [53:11] But I know it's nowhere close to the total that we were seeking. [53:15] So is that the reason for the delays and the cancelations? [53:22] And where are we with the total score of the 10 billion? [53:28] Where do we get to? [53:30] Where we are is in phase 1. [53:32] And I want to say the original cost estimate was [53:35] 2.3 or $2.5 billion. [53:39] But that number was developed seven years ago. [53:43] And as Katie indicated, some of these factors [53:46] that are hitting us are blowing cost estimates [53:51] right through the roof. [53:54] So we can certainly provide more information. [53:57] There are various reasons why we've been challenged. [53:59] We were delayed for some time on our Simi Valley Double Track [54:02] Project because we had a dispute with the Union Pacific Railroad. [54:06] That's been resolved. [54:07] But in the meantime, construction costs [54:09] have escalated. [54:10] So that project isn't fully funded. [54:12] So there's a variety-- that's just one example. [54:15] We've found other ways to try to get some benefits that [54:19] deliver without the Serra siding being one of those projects [54:22] where we have some other bets. [54:23] We have a project in downtown Riverside [54:25] that was going to be funded. [54:26] And we've been able to find a more efficient way [54:28] to get benefit from it that's going to be less expensive. [54:31] So we're always trying to be creative [54:34] that, again, that plan was developed seven years ago. [54:36] So as we have to bob and weave to a certain degree, [54:40] and this is why this project we're excited about it [54:44] is because we're going to make this one happen. [54:47] Good. [54:48] All right, any other comments, questions? [54:51] OK, this one is an action item. [54:54] So moved. [54:55] Do I have a second? [54:59] All in favor, aye. [55:01] Opposed, abstentions. [55:03] Motion carries. [55:05] Item 7F, system safety, security and compliance, [55:12] SSSC Department activities update quarter three fiscal year [55:16] 2026, presented by Hillary Konczal, [55:20] Chief Safety Security and Compliance Officer. [55:23] Good morning. [55:24] Again, today, I'm here to present our third quarter safety [55:29] security and compliance stance. [55:30] Next slide, please. [55:33] So total train strikes for quarter three [55:38] were flat compared to quarter two. [55:40] If you look at the bottom there, those [55:42] are the number of train strikes by type. [55:46] Nothing alarming, but we are trending downward [55:48] for the year, which is very, very positive. [55:51] Next slide, please. [55:54] So here, you'll see the train strikes by county. [55:58] LA Riverside Ventura counties recorded one less train strike [56:02] in Q3 than Q2. [56:03] Orange County is flat. [56:05] And San Bernardino county recorded three more train [56:08] strikes in the third quarter than they [56:11] did the second quarter. [56:12] So we are watching those closely. [56:15] And again, as I said, we have a total [56:17] of 15 train strikes for the year. [56:21] Next slide, please. [56:22] These are the same numbers broken down [56:24] by line, just to give you a different visual perspective. [56:28] Ventura line is flat. [56:30] Antelope Valley, 91/Perris Valley, [56:33] Orange and the IEOC lines all recorded one less train strike. [56:39] San Bernardino recorded five more train strikes [56:42] than they did in Q3 than Q2. [56:45] In Q2, they had zero train strikes. [56:48] Riverside recorded two less train strikes, [56:50] and then Airline recorded one more train strike. [56:54] And as a reminder, a lot of these lines [56:57] go through more than one county. [56:59] So that's why we do it both ways. [57:02] Next slide, please. [57:04] So here we have our fare evaders unruly passengers. [57:06] They're up quite a bit. [57:08] Don't want to alarm you. [57:10] The reason why they are up quite a bit [57:12] is because we have increased our fare collection [57:17] strategy, so to speak. [57:19] Alstom obviously increased their requirement to 50%. [57:24] And we also increased the amount of streetcaring [57:27] we're doing at Union Station. [57:29] So what we do is we'll hold our customers at the ramp [57:35] to make sure they have a valid fare to get onto the platform. [57:38] And that's helped immensely. [57:40] That's a lot of the reasons why the fare evasion is up. [57:43] And then the unruly passengers is tied very closely [57:46] to fare evaders because once you tell somebody [57:50] that they can't take the train, then it gets confrontational. [57:53] So then we have them ticketed or arrested. [57:55] And that's when they become an unruly passenger. [58:00] Next slide. [58:04] These are basically conductor assaults or assaults [58:07] on trains that are recorded through the National [58:11] Transportation database. [58:13] We've recorded six for the month of February and eight for March. [58:20] Even though it says nonmajor physical, [58:22] the nonmajor physical ones are if somebody's pushed [58:25] or there may be a nudge or something. [58:28] So we do watch those. [58:30] And our law enforcement is always close by [58:34] to handle any of those assaults. [58:36] Next slide, please. [58:38] So these are law enforcement activities by county. [58:44] These are conducted by the LA County Sheriff's Department. [58:46] I just want to specify that. [58:49] And for the three months for quarter three, [58:53] there were a total of 6,821 law enforcement details that were [58:57] conducted by the LA County Sheriff's Department. [59:00] The next slide, please. [59:02] So this is the same information just again broken down by line [59:07] by the LA County Sheriff's Department again for a total [59:11] of 6,821 law enforcement details that were conducted. [59:18] And I just want to remind you, these are in addition [59:23] to all of their other duties. [59:24] A lot of times, there's a call for service. [59:26] We have to handle a fare evasion, [59:31] dealing with right of way inspections. [59:34] So there's a lot of things that go on in addition to this right [59:38] here. [59:40] Next slide, please. [59:42] So these are the same law enforcement activities [59:45] by the San Bernardino Sheriff's Department. [59:48] They monitor or patrol the San Bernardino County line [59:53] or the San Bernardino line, I apologize, from Montclair [59:57] through Redlands University station. [59:59] So they had a total of 3,027 law enforcement activities. [1:00:05] Next slide, please. [1:00:06] So the rule violations, I'm happy to report, [1:00:09] are trending downward, even though it increased by three [1:00:14] in the third quarter. [1:00:16] Last year, if you remember, we had a spike in rule violations. [1:00:19] We created an action plan. [1:00:21] And I'm happy to report that our rule violations are [1:00:25] down for the year 78%. [1:00:28] So this is a positive story, even [1:00:30] though there's a little spike in rule violations there. [1:00:34] And we do continually watch them and work with our operations [1:00:37] team. [1:00:38] Next slide, please. [1:00:40] So FRA reported injuries. [1:00:42] We recorded two less injuries in Q3 than we had in Q2. [1:00:50] Injuries are down 18% compared to the previous year. [1:00:53] A lot of them were like-- we had two pinch points, [1:00:57] I think one slip and fall, but nothing major to report. [1:01:02] Next slide. [1:01:04] So training, we continue to train our employees [1:01:07] in numerous safety and operational practices. [1:01:10] Safety is the most important thing [1:01:12] here at Metrolink in addition to a lot of other operational [1:01:18] [AUDIO OUT]. [1:02:01] And we did a phenomenal job. [1:02:04] And when I say we, I say Metrolink as a whole. [1:02:07] There were no safety issues. [1:02:08] No incidents, security incidents whatsoever. [1:02:12] We did have increase in ridership. [1:02:14] I believe the 15% increase in ridership [1:02:16] that I put up there may be low, but those were initial numbers [1:02:19] that I got when I was putting together the presentation. [1:02:22] So I just wanted to point that out that even us as an agency, [1:02:25] we should be extremely proud. [1:02:29] I've worked on NATO, the Obama campaign, his inauguration. [1:02:34] These national events are huge. [1:02:36] They take a lot of coordination with Secret Service, FBI, DHS, [1:02:42] TSA. [1:02:43] And with the limited number of resources that we had, [1:02:46] our team did a phenomenal job and at Darren's leadership, [1:02:51] I should say. [1:02:52] So I just want to point that out there. [1:02:54] Next slide. [1:02:56] So these are just a few. [1:02:57] I can't go over everything we did because a lot of it, [1:02:59] we don't want to give our secrets away [1:03:02] because we're going to start preparing for the Olympics next. [1:03:05] But we've held two active shooter drills before the event. [1:03:10] They were simulated. [1:03:12] We had law enforcement on the train. [1:03:15] We had actors that acted as an active shooter. [1:03:20] So we did a lot of preparation. [1:03:23] LASD, we had a workshop with them [1:03:26] or drill with them and then San Bernardino County. [1:03:31] And we also included local law enforcement. [1:03:34] All forward-facing employees were trained in bomb detection [1:03:38] to know what to look for if they seen a suspicious package [1:03:40] or bomb along the railroad right of way or what have you. [1:03:45] And we had limited resources. [1:03:48] But we were lucky through LA County and the County Sheriff's [1:03:52] Department to be able to obtain 22 additional officers, two [1:03:58] sergeants and a lieutenant for match days [1:04:01] at no cost to Metrolink. [1:04:03] So that was a plus. [1:04:04] And they helped us out with Allied Universal. [1:04:07] We had 15 additional armed. [1:04:08] We were able to obtain 15 additional armed security [1:04:11] guards. [1:04:12] So they were strategically placed throughout the system. [1:04:15] And then our LA County Sheriff's Department [1:04:17] and our San Bernardino Sheriff's, [1:04:19] they did over 200 I say facility inspections. [1:04:23] But those are everything along our 564 miles of track [1:04:27] that they were patrolling. [1:04:31] Next slide. [1:04:34] The other thing we did was before the beginning [1:04:38] of the matches, we did high rail trips [1:04:40] with an officer in the high rail to make sure [1:04:42] that there's nothing along the railroad right of way, [1:04:45] no sabotage, suspicious people. [1:04:49] We increased our street coloring, our fare enforcement. [1:04:53] And then we worked weekly with LA Metro. [1:04:57] And we had one of our employees, a security employee, safety [1:05:02] employee, and then an LASD Sheriff deputy [1:05:06] in Metro's ESOC, which helped us coordinate [1:05:10] the busing to our trains at Union Station and vice versa. [1:05:13] So there was a lot of coordination. [1:05:15] It all worked well. [1:05:16] I'd be remiss if I didn't thank Michael Litschi and the customer [1:05:19] service team as well and the operations team. [1:05:22] But that will conclude my-- oh, I'm sorry. [1:05:24] Hold on. [1:05:25] One more slide. [1:05:26] This is what I really wanted to thank. [1:05:28] So I just want to recognize a few people. [1:05:31] And if you're in the room, please stand up. [1:05:33] I know that two of them are on vacation. [1:05:36] Captain Abi Ben-Sahile from the LASD Metrolink Bureau, [1:05:41] Lieutenant Nick Aguirre from the LASD Metrolink Bureau, [1:05:48] Sergeant Ryan Bressler, he's on vacation. [1:05:51] He worked too much. [1:05:52] He said he needed time off, so. [1:05:54] And Nicole Adams, our security manager for Allied Security, [1:05:57] who's in the back. [1:06:00] And Tinh Quach, manager of security and law enforcement [1:06:03] who works for me. [1:06:04] He is actually on vacation. [1:06:05] And then Eric Smith, who's to my left, our manager, emergency [1:06:08] preparedness and operations trainer. [1:06:10] This guy, I call him professor. [1:06:13] He's phenomenal. [1:06:14] But I just want to thank everybody. [1:06:15] Thank you. [1:06:16] [APPLAUSE] [1:06:20] And that will conclude my report. [1:06:22] Very good with applause at the end. [1:06:23] That's amazing. [1:06:25] Comments from the board? [1:06:27] Just a question. [1:06:27] Thank you. [1:06:28] A quick question. [1:06:28] We get reports of trains versus unoccupied vehicle. [1:06:31] What is normally the cause of having an unoccupied vehicle [1:06:34] on the track? [1:06:35] Usually, the vehicle will stall, and the person [1:06:38] will get out of the vehicle. [1:06:41] There's been a few instances where a vehicle was stolen [1:06:43] and they parked it on the track. [1:06:45] But most of the time, it's somebody that gets [1:06:47] stuck on the track. [1:06:48] The car might die, and they just out of panic, they [1:06:52] get out and trying to call 911 and stuff like that. [1:06:55] Any investigations if any of these are intentional? [1:07:00] There are a couple that are intentional. [1:07:02] And we get that determination from the coroner. [1:07:05] A lot of times, when the police department, [1:07:07] when they're doing their investigation, [1:07:09] they'll suspect it's intentional. [1:07:12] But we really go off of the coroner's manner of death, [1:07:16] but yeah. [1:07:17] I guess I'm talking about unoccupied vehicles. [1:07:18] Anybody parked their car and leave just to cause a collision? [1:07:22] Oh, no. [1:07:23] No, we haven't had that since way back. [1:07:26] I don't want to mention it. [1:07:29] But no. [1:07:31] All right, any other comments or questions? [1:07:34] Well, very good. [1:07:35] I guess that was a good test run for what's coming up in 2028. [1:07:40] And it was nice to see. [1:07:43] And you say a 15% increase in ridership during that period? [1:07:47] Roughly, yeah. [1:07:48] That's good. [1:07:51] All right, and with that-- [1:07:53] Those were preliminary numbers. [1:07:55] Perfect. [1:07:56] Do we have any public comments? [1:07:59] That's receive and file. [1:08:00] That'll be the order of business for that. [1:08:03] And we will move to Item 7G, July legislative update, [1:08:09] being presented by Jeff Dunn. [1:08:10] Good morning, Vice Chair Chaffee, members of the board. [1:08:13] Next slide, please. [1:08:14] The California legislature is presently in its summer recess, [1:08:16] will return on August 3 to begin the final stretch [1:08:19] of the legislative session. [1:08:21] At that time, lawmakers will take up legislative fixes [1:08:23] to the Budget Act passed in mid-June, [1:08:25] including various trailer bills to amend, clarify and amend, [1:08:29] or implement specific provisions of the budget. [1:08:32] It is within this budget trailer bill activity [1:08:35] that Metrolink is seeking state assistance [1:08:36] to appropriate $35 million of operations [1:08:39] funding to the railroad to avert or relieve [1:08:43] the budgetary challenges that we are tasked [1:08:45] with addressing to allow Metrolink [1:08:46] to operate at full service. [1:08:49] We are circulating a joint legislator sign on letter [1:08:52] to be delivered to the governor and legislative leaders [1:08:54] in early August. [1:08:55] And our CEO, Mr. Kettle, will be traveling to Sacramento August 5 [1:08:59] to pursue in-person this advocacy with lawmakers [1:09:02] and administration officials. [1:09:04] We will keep you apprised as these efforts continue. [1:09:06] Next slide, please. [1:09:09] On the federal side, yesterday, the house [1:09:10] departed for summer recess after narrowly passing a continuing [1:09:15] resolution to keep the government funded [1:09:16] until December 4. [1:09:18] It will return to session on August 30. [1:09:21] The Senate remains in session until August 7 [1:09:23] before it takes its recess. [1:09:25] Regarding the FY 2017 bill, the House Bill [1:09:28] cuts passenger rail by an estimated $17.2 billion, [1:09:32] which includes expiration of advance appropriations [1:09:34] under the IIJA cuts to Amtrak intercity rail and the Sea Grant [1:09:39] program. [1:09:39] The bill passed the Appropriations Committee [1:09:41] on June 3 by a party line vote. [1:09:43] In the Senate, the Appropriations Committee [1:09:45] has yet to release its bill or set a date for markup. [1:09:48] Current level funding expires on September 30, [1:09:50] unless a CR or successor THUD appropriations bill [1:09:53] passes by or before that date. [1:09:55] In Olympics funding, as reported to you last month, [1:09:58] Metrolink has held a senior level meeting [1:10:01] with FEMA officials to share its recommendations for funding [1:10:04] allocation best practices in the soon to be released notice [1:10:07] of funding opportunity to guide allocation of the $1 billion [1:10:11] of Olympics security funding provided by the Big Beautiful [1:10:14] Bill. [1:10:15] Metrolink will continue meetings with FEMA district staff [1:10:18] and state officials at Cal OES to ensure [1:10:21] these processes are implemented as efficiently as possible [1:10:24] once the NOFO is released and will keep the board apprised. [1:10:27] This concludes my presentation. [1:10:28] I'm happy to take any questions. [1:10:30] All right, very good. [1:10:31] Comments, questions, Karen. [1:10:34] That word, "continuing resolution," I know we just-- [1:10:39] I believe that's the first time we've done that. [1:10:41] We've had to do it in the past. [1:10:42] But it's been a number of years. [1:10:44] Number of years. [1:10:47] In the opposite, has there ever been [1:10:52] our legislature that didn't have a continuing resolution? [1:10:58] It seems in Washington, DC, not in recent memory, of course. [1:11:01] I think it's reflective of the budgetary divide [1:11:05] in both chambers. [1:11:07] Well, your comments were very much [1:11:11] appreciated when you said we'll start working on earlier. [1:11:13] So we don't have this again because you do it [1:11:16] the second time, it's going to become a habit. [1:11:20] So I just want to make sure that we work [1:11:22] really hard not to do that. [1:11:24] I certainly, I have ill feelings towards our legislature [1:11:28] that continually do that. [1:11:30] Now they're on break because they [1:11:31] did the continuing resolution. [1:11:33] It's disingenuous to us. [1:11:37] So thank you for your sharing of wonderful words. [1:11:42] Well, I would say, at least in the federal side, [1:11:45] if a continuing resolution passes and funds the government [1:11:49] through December 4, that means status quo funding, which [1:11:53] is actually good because the House Bill cuts passenger [1:11:56] rail significantly. [1:11:57] The Senate likely will not do a bill. [1:12:00] If they don't, they'll have to go by CR, [1:12:02] and it's level funded through December 4, which [1:12:04] is better than cuts. [1:12:06] OK, thank you. [1:12:08] All right, yeah, Catherine. [1:12:09] So-- and thank you for that. [1:12:11] On the federal side, on the Olympic security funding, [1:12:14] I'm assuming that you are coordinating with LA28, [1:12:17] so that when we're asking for the security funding, [1:12:20] it's a holistic approach to-- [1:12:22] It is a holistic approach absolutely with actors. [1:12:25] Now, in terms of our meeting with FEMA, [1:12:27] we were focused on our recommendations [1:12:30] for Metrolink and for passenger rail procedurally when [1:12:34] the NOFO is released so that it is efficient as possible. [1:12:38] But of course, the security funding [1:12:41] is very much holistic from all the agencies. [1:12:44] Are you meeting with LA28 or do you [1:12:46] have a relationship with LA28? [1:12:48] We do have a relationship with LA28 [1:12:50] where I'm not meeting with them specifically [1:12:52] on security funding. [1:12:53] I don't know if we are there. [1:12:54] Yes, we are, Director Barger. [1:12:57] Both myself and then Hilary Konczal is coordinating. [1:13:01] We regularly coordinate with LA28 [1:13:03] on the security side as well as Metro. [1:13:05] Because I would just think if we apply supporting one another, [1:13:13] I don't know. [1:13:13] What amount are you requesting? [1:13:17] Do you know? [1:13:21] I'd have to-- [1:13:22] Yeah, I'd like to find out more about this [1:13:24] because what I'm finding is happening [1:13:25] is that many agencies are kind of working on their own [1:13:28] without coming together. [1:13:30] And I think it's important as we move forward, [1:13:33] we move forward with one voice so that we have coordinated [1:13:35] effort because while you're doing security on Metrolink-- [1:13:38] and by the way, I'm really proud of-- [1:13:41] and we all talked about the fact that we had no incidents [1:13:44] with the World Cup. [1:13:47] And I want to carry that over to the Olympics. [1:13:49] But I think it works when you are coordinating [1:13:51] across all regions to make sure that we [1:13:56] are coordinating our efforts and not duplicating. [1:14:00] And Jeff, correct me if I'm wrong. [1:14:01] So we know FEMA has already been given it [1:14:04] was I thought a billion, right? [1:14:06] Yes, sir. [1:14:06] And so what we have tried to do is for the Olympics. [1:14:11] And so what we're trying to do is as FEMA develops [1:14:15] its notice of funding availability, [1:14:17] that there is a recognition of the role that commuter rail, [1:14:21] we would play in that larger situation [1:14:23] so that we are able to access those dollars directly. [1:14:27] But we're doing it in collaboration [1:14:29] with all of the law enforcement that's involved. [1:14:32] Yeah, and I would agree that you all play an important role, [1:14:36] especially in bringing people into the region for the games. [1:14:40] And so, I mean, I'll advocate that you all [1:14:43] are an equal member at the table because when it comes [1:14:48] to transportation, we're looking at across the board [1:14:51] accessibility and giving people options to get to the venues. [1:14:56] Thank you, supervisor. [1:14:57] I would say one of the things that we're [1:14:58] going to be focusing on and that we communicated [1:15:00] with FEMA is that there be flexibility, once the NOFO is [1:15:04] released, to have funding move as expeditiously [1:15:07] as possible to agencies that need it in order [1:15:10] to allow enough time to implement [1:15:12] the requested funds for. [1:15:15] For example, we need to install camera systems [1:15:18] on our entire fleet across the entire network. [1:15:21] And that takes time. [1:15:22] And so if the NOFO and the process [1:15:24] goes too far into abutting the actual Olympics themselves, [1:15:29] even if the money were to be appropriated [1:15:32] beyond a certain period of time, we [1:15:33] would not have enough time to make those types of investments. [1:15:37] So that's one of the messages that we're [1:15:40] communicating that there's flexibility in the process, [1:15:42] that we not only get the funding that we're asking for, [1:15:44] but we get it timely. [1:15:47] Very good. [1:15:48] Any other comments? [1:15:49] Thank you very much. [1:15:50] Oh, public comments. [1:15:52] We do have a request to speak from Adriana Rizzo on this item. [1:15:55] OK. [1:16:00] Hello, there is a line in the agenda packet for this item that [1:16:06] was not in the report but I thought [1:16:08] was really important about the need for sustainable funding [1:16:12] sources that are not one-time. [1:16:14] Just want to highlight that. [1:16:18] I think there's a couple of opportunities for Metrolink [1:16:21] to advance that goal. [1:16:24] But the current lobbying efforts are really important. [1:16:28] But I think there's a couple of opportunities looking [1:16:31] a little bit farther in the future for Metrolink [1:16:33] to advance that goal. [1:16:36] One of them is there's a proposition [1:16:38] on the ballot this year, I believe it's prop 2, [1:16:41] to increase the state's rainy day fund. [1:16:43] I think this is really important for the state [1:16:46] to be able to find more sustainable, less [1:16:50] intermittent funding for transit because we [1:16:54] have a feast or famine budget situation at the state. [1:16:57] And more stable year to year funding [1:16:59] will make it easier to provide stable funding for transit. [1:17:04] Secondly, another opportunity is reforming the transit [1:17:09] development act. [1:17:10] As I mentioned in a previous comment, [1:17:13] the unmet needs process allows millions [1:17:17] of dollars in transit formula funding that [1:17:19] can go to operations to be spent on other things every year. [1:17:24] This is a big priority for transit advocates. [1:17:28] And I love for Metrolink and member agencies [1:17:33] to get involved in that process next year as well. [1:17:37] And then finally, just again, I think [1:17:42] Metrolink needs its own income, so to speak, [1:17:48] needs the ability to find new revenue that is not [1:17:52] controlled by member agencies. [1:17:54] And this is something that will require state authorization. [1:17:58] So just flagging that for the board as well. [1:18:01] Thank you for all your efforts. [1:18:04] All right, very good. [1:18:05] Thank you. [1:18:05] Any last comments on this from the board? [1:18:08] All right, good. [1:18:09] We will move to Item 8, our chief executive officer's [1:18:13] report. [1:18:13] Darren. [1:18:14] Yes, thank you, Mr. Chair. [1:18:15] Next slide. [1:18:16] So we touched on the mechanical challenge we had over last week. [1:18:21] And I've used the term that it was a bit [1:18:22] of a perfect storm of factors. [1:18:26] And again, a fundamental part of this [1:18:30] is the challenge we're wrestling with with the F125 locomotive, [1:18:35] the only 40 in operation anywhere in the world. [1:18:39] So we wrestle with those challenges [1:18:41] with the manufacturer. [1:18:43] And again, I think we're going to see some progress in some [1:18:46] of these areas. [1:18:46] But it is just one of the challenges of that locomotive. [1:18:50] So it was not lost on Metrolink staff by any means [1:18:54] that there's room for improvement. [1:18:57] And under Rod Bailey's leadership [1:18:59] as the interim chief operating officer, [1:19:02] there's already lessons learned effort in some of these things. [1:19:06] And as usual, sometimes communication breakdowns [1:19:10] are the biggest challenge that we experience. [1:19:12] And that was one of the cases that happened here. [1:19:15] But nonetheless, it's got our full attention. [1:19:18] Next slide. [1:19:20] Some really good news. [1:19:22] We're really pleased to be able to share that our finance [1:19:27] team once again received the GFOA certificate of achievement [1:19:32] 10 years running. [1:19:35] So that's a decade of success in this area. [1:19:38] And some of you have been around for an extended period of time [1:19:41] and will remember the times when we were not getting this award. [1:19:44] So I think it's a testament to our finance team [1:19:49] that we were recognized again this year. [1:19:52] Next slide. [1:19:54] All right, so we're all just reveling in the glow [1:20:00] that came out of the World Cup. [1:20:02] So we have a video here. [1:20:04] And I'd just like to share with board members what [1:20:08] our customers shared with us during World Cup. [1:20:12] Go ahead and roll the tape. [1:20:14] [VIDEO PLAYBACK] [1:20:17] - I'm really excited because I love soccer, [1:20:19] and especially because my brother loves soccer. [1:20:22] That's why I do. [1:20:24] And right now, we're on the train. [1:20:27] It's my first train in the US. [1:20:29] And it's been a pleasant experience so far. [1:20:34] - Once I realized it was at Union Station, once I [1:20:36] googled it, I said, oh my gosh, I have to go. [1:20:41] I don't have to drive. [1:20:42] I can take the Metrolink all the way up [1:20:44] and not worry about parking, get there safe and sound [1:20:47] and enjoy my time. [1:20:49] - I was telling my family that this [1:20:51] is a really nice, very clean station, very clean train. [1:20:55] And it branches out all over the place now, so. [1:20:59] - So it's just a lot more affordable. [1:21:04] And also sometimes, it's just more convenient. [1:21:06] If it's rush hour, it's so much easier to just get on a train [1:21:10] somewhere than sit in the car and inch forward [1:21:13] every few seconds. [1:21:14] - [NON-ENGLISH SPEECH] [1:21:33] [END PLAYBACK] [1:21:36] So thanks to our comms team for going out and convincing people [1:21:40] to share a few words on their experience with World Cup, [1:21:45] whether it was going to a match or going to the fan zones. [1:21:49] Next slide. [1:21:51] All right, so a couple things. [1:21:55] Picture to the left, you'll recognize the guy. [1:21:59] The lovely lady to his left is my wife, Carrie. [1:22:03] We did have a chance to go to the Spain Austria game, [1:22:06] one of the knockout stage matches. [1:22:08] And we experienced what our customers experienced. [1:22:11] We caught the train at the Moorpark Station, [1:22:15] made our way to Union Station. [1:22:17] And then from LA Union Station, we got on a Metro bus. [1:22:23] My compliments to Metro, the full Metro team. [1:22:27] I had a chance to see Conan Cheung the other day [1:22:30] and complimented him. [1:22:32] We got on a bus that was clean, smooth. [1:22:35] My wife was a little nervous of a neighborhood bus [1:22:38] doing 65 miles an hour on the flyover between the 110 [1:22:42] and the 105 as we got there because I felt [1:22:47] a little bit like Scotty from Star Trek [1:22:51] that it's like, we're going to break up, [1:22:53] we're going to break up. [1:22:54] Because it was shaken a little bit, [1:22:56] but it was a great experience, other than the portion of just [1:23:00] being in LA traffic that, unfortunately, [1:23:02] we found ourselves in. [1:23:04] The bus was well air conditioned. [1:23:06] The staff was great. [1:23:08] We had a great experience. [1:23:11] Along with that, though, I had the chance [1:23:12] to volunteer with a number of our Metrolink staff [1:23:16] in the tunnel. [1:23:17] And so this was after our board meeting last Friday. [1:23:20] I Friday of last month changed into a different suit [1:23:26] and joined our team volunteering and helping guide customers. [1:23:31] That was obviously on a game day. [1:23:34] So had a great experience with helping our staff. [1:23:38] We had something on the order of 60-odd of our staff volunteered, [1:23:42] number of people volunteered on multiple occasions. [1:23:45] So it was just a really good feel good moment [1:23:47] to be a part of the Metrolink team. [1:23:48] And we got a jersey out of it, a Metrolink jersey out of it. [1:23:52] Just let us know if you'd like one. [1:23:54] They run big though. [1:23:57] But going back to one of the other questions, [1:24:00] how we saw success out of it. [1:24:02] We had a weekend boardings increase of 26% [1:24:07] compared to the prior six weekends prior to the World Cup. [1:24:12] So weekend boardings, 26% increase over the prior six [1:24:16] weeks. [1:24:17] We had a system-wide ridership growth of 12% year over year. [1:24:21] This is the statistic I'm most pleased with, though. [1:24:24] Nearly 25,000 new Metrolink mobile accounts were created, [1:24:30] representing a 22% increase of new riders introduced [1:24:34] to our system over that six-week period. [1:24:37] So that is directly attributable. [1:24:40] They're going to matches. [1:24:42] They're going to fan zones. [1:24:43] They downloaded our app, and they signed up for it. [1:24:46] So I think that's a real positive story. [1:24:48] And just what a great experience across Southern California [1:24:53] to be a part of it. [1:24:54] And yeah, it was a great experience. [1:24:57] Next slide. [1:24:59] And that's it, Mr. Chair. [1:25:00] Thank you. [1:25:00] Very good. [1:25:01] Thank you. [1:25:02] All right, board member comments. [1:25:04] Anybody have anything to talk about? [1:25:07] Lunch. [1:25:08] Chair's comments. [1:25:11] I just wanted to mention a couple things. [1:25:13] One, I went over after that last BAF Comm meeting [1:25:17] with Director Dutrey and Marquez, [1:25:20] and we went to the fan zone. [1:25:23] I thought kind of a precursor to what I expect, [1:25:26] the Olympics will be something similar. [1:25:28] And LA Metro, I have to complement their staff [1:25:32] and the way they set it up. [1:25:35] It was neat. [1:25:36] You felt like you were really involved [1:25:38] in the game that was on and just the fans and the support. [1:25:42] It made sense. [1:25:44] And I hope that they take that forward to 2028. [1:25:50] And the other thing, I guess that is going to be it. [1:25:55] If I can, I think thank you, Metrolink, for this. [1:26:02] My mom passed just a week or so ago. [1:26:06] And thank you, Karen. [1:26:07] I was in Vegas where she lived during that meeting. [1:26:11] And Karen stepped up. [1:26:12] And appreciate that so that I could tend to that. [1:26:18] But I would like, if possible, to just conclude today's meeting [1:26:23] in the memory of my mother, Audrey Phyllis Reitman [1:26:25] Berkson, who was born in December 15 of 1936 [1:26:31] and passed July 1 of this year. [1:26:34] So 89 and 1/2 wonderful years with myself and my two sisters [1:26:39] and her three grandchildren. [1:26:42] All going to miss her. [1:26:43] But with that, we will close in memory of my mother. [1:26:48] And this meeting is adjourned. [1:26:50] Thank you. [1:26:56]