[0:00] >> Calling to order the August [0:03] 3rd. [0:04] >> Meeting of this Start [0:05] Preservation Commission, [0:08] Mister. And can you please call [0:09] the Roll? [0:16] >> Sallie pelts here, [0:20] Nick. Alas Robinson, [0:24] Matt to rose [0:27] rather about men here. [0:30] But tree check keeping excused [0:33] and Jordan are out there. [0:37] >> All right. We'll start with [0:39] item number. Perfect. Yeah, [0:41] she's all. There we go. [0:43] Perfect. Everybody's here. [0:46] We'll start with the item. [0:48] One to 6, 0, 1, 6, 1, [0:50] resolution really into a [0:51] certificate certificate of [0:53] appropriateness for the infill [0:54] of one door at 2, 6, 6, 5, [0:56] North Lake Drive in the North [0:57] Pointe North Historic District [0:59] for Anna Tims. Incorrect. [1:01] Rick. Be. [1:02] >> Kami. Could you call the [1:04] city channel? There you have [1:05] it. Set me up for a covered [1:06] porch sharing. Okay. [1:16] We're selling. [1:18] She's on online for the best [1:33] so long. It's just able to [1:34] really work [1:40] is coming here [1:43] is this. [1:45] I'm with you. [1:53] >> Just a couple of things. [1:55] That's not you know, if [1:56] students solution solutions to [1:58] that [2:09] and you just don't know [2:15] you used to that. [2:17] >> Yeah, thanks for all right. [2:20] Thanks. [2:21] We now have to do that. [2:30] Yeah, I thought [2:33] we are we going. [2:37] Michael, thank you. [2:42] >> Here we go. We've got got [2:43] the power point going. So [2:51] so we've got the team, Michael [2:53] Reaves House and 1915, [2:55] foursquare for graft here, [2:58] front elevation. This is the [3:00] rear elevation, the west [3:01] elevation. And they are [3:03] proposing removing one next to [3:06] your door, which currently it's [3:08] just used for exterior storage. [3:11] But they want to remove that an [3:13] infill, the opening to enlarge [3:15] the kitchen area. [3:17] So here's the ovation. As it is [3:19] existing with that door, [3:21] they would [3:24] remove that opening in fill it [3:26] with stucco to match the [3:29] existing texture and color of [3:32] the rear facade. It's not [3:33] visible from the right of way. [3:34] It is the rear facade. So staff [3:37] is recommending approval with [3:38] conditions and the conditions [3:40] just being that Noosa Colby, [3:42] Portland, cement stucco know if [3:44] this would be allowed and that [3:46] this circle should match [3:48] the original stucco in terms of [3:50] texture, hardness and sickness. [3:54] >> All right. Can you go back [3:55] to the original what it looks [3:56] like now, please? [4:01] Yeah, thank you. [4:02] That's stucco that blue. [4:04] Yes, correctly to stop it. [4:07] It's hard to tell. [4:09] And it's peeling a little bit, [4:10] too. [4:12] The repair it anyway. [4:16] >> Many of the commissioners [4:17] have questions on this matter. [4:20] Move approval. All right. [4:21] To have a second second. [4:23] All in favor. Aye. I'm all [4:25] right. [4:26] >> Moving on. [4:28] >> To item 2 to 6, 0, 4, [4:31] 0, for resolution relating to a [4:33] certificate of appropriateness [4:34] for new patio doors. And new [4:36] deck at 107 West Brown Street [4:38] and the Brewers Hill Historic [4:40] District for Brew City BN Beast [4:43] Company. [4:44] Thank you. [4:46] >> So this is this is the [4:48] house. It's a second. [4:50] >> Pt 91 queen and located on [4:52] the corner of first and brown, [4:54] the front of the house faces [4:57] Brown Street. It does have this [4:59] very large side yard. You can [5:02] see the photograph on the left [5:03] shows the front of the house, [5:05] the photograph on the right [5:06] shows the side yard, which is [5:08] on First Street. So this is [5:09] from first looking looking [5:12] towards the house. So it is [5:13] quite a large side yard. [5:15] They don't have a side yard. [5:17] On the other side. It's the [5:18] neighboring property on the [5:20] West side. [5:23] So they're proposing this is [5:24] the existing and this is a [5:26] mockup, a rendering of what [5:28] they're proposing to enlarge [5:30] that window opening on the bay [5:32] there and and and saw the deck. [5:37] The renderings not completely [5:38] accurate. The stairs in the [5:40] plans, wouldn't, you know, [5:42] just go onto the grass there [5:44] series that would go on to the [5:45] existing the existing sidewalk, [5:47] which where this is the side [5:49] yard right here. Yeah, [5:51] his face is which direction [5:54] this yard is on the court and [5:55] this is on first and grounds of [5:56] the side yard faces First [5:58] Street North First Street where [6:00] like Mark standing on First [6:01] Street looking at it. Yeah. [6:02] And Brown is to the to the [6:04] right. [6:06] The front facade is to the to [6:08] the right around the corner. [6:12] So the proposed DEC [6:16] would be 15 feet and a half by [6:19] a deep by 13 and a half feet [6:21] wide [6:22] new wood deck, which would [6:24] consist of pressure treated [6:25] decking 4 by 4 posts to I-2 [6:27] spindles one by 4 skirting [6:32] the mold and rails which we [6:35] could work on with the [6:38] applicant to nail the final [6:39] design. So this is what the [6:41] public is proposed for the DEC, [6:44] the applicant and provide the [6:45] exact specimens for the patio [6:48] door, though it is shown to be [6:49] a sliding door. So we would [6:51] need a little bit more details [6:53] on that were HPC to approve [6:56] that [6:59] tried to draw roughly the size [7:01] of the deck adjacent to the [7:04] present yards. So it would [7:05] extended pretty significantly [7:07] into the side yard. [7:11] And as you can see on the [7:13] rendering it almost [7:16] to staff's mind, you know, [7:17] flips the primary ovation and [7:19] makes a side elevation appear [7:21] to be of the primary front [7:22] facade, rather than a secondary [7:24] facade. [7:25] The preservation guidelines for [7:27] Brewers Hill states retain [7:28] exist, existing window and door [7:30] openings that are visible from [7:31] the public right of way to [7:33] avoid enlarging openings. [7:37] They also [7:40] advice to discuss avoid [7:42] discarding original doors and [7:43] windows that can be repaired or [7:44] replaced. [7:50] The saffeels at the proposed [7:51] can the large COVID Ning don't [7:53] comply with the preservation [7:54] guidelines for the district and [7:57] that the enlarged [7:59] DEC would be proved 2 prominent [8:01] into visible from the side yard [8:04] and adding a deck of that [8:05] location would detract from the [8:06] actual front facade again [8:08] making it appears of the side [8:10] elevation was the actual front [8:12] recommend front elevation. [8:15] Staff recommends that if the [8:17] deck is is desired at this [8:20] location, that perhaps this [8:21] would be a good compromise to [8:24] created or from this rear [8:26] window and add in health health [8:28] shaped Hudak that would be [8:30] adjacent to the one story [8:32] addition. That's kind of tucked [8:33] away behind that tree but have [8:36] a deck that would be roughly [8:37] the size of that addition that [8:39] could wrap around slightly and [8:41] connect to both the front and [8:43] back side walks roughly in the [8:46] in the shape shown here [8:48] outlined in the red. [8:53] So with the preservation [8:54] guidelines in mind at the [8:56] present proposal, staff [8:57] recommends denial of the [8:58] sliding doors and Dak again [9:00] with a [9:02] the cabbie out that if HPC [9:04] agrees that perhaps a scaled [9:06] down a debt could be located [9:09] along that rear for facade and [9:11] slightly onto the onto the side [9:13] facade. [9:15] >> Question to you. Is your [9:18] concern, the fact of a deck or [9:20] the way the deck is designed? [9:22] >> Just its prominence at size, [9:24] how far it juts into that side [9:25] yard and again, with the with [9:27] the addition of that larger [9:30] opening, their it hit, [9:32] it makes it seem as though the [9:33] side to side becomes the [9:35] primary facade produced this. [9:37] This is a rendering. Have you [9:38] see the finished version? [9:40] Looks like that's a change, [9:41] Shiite. I think that makes him [9:42] and I think it's a I was going [9:43] to change. It looks like that's [9:44] something I mean in town are. [9:46] >> I mean, very suburban mean [9:47] if they were to have a standard [9:49] or not a sliding door [9:53] coming up at the the. [9:55] >> I'm a caregiver. You should [9:58] come out and come out and give [10:01] us your after this. I want to [10:02] set in these crowds here. [10:05] Yes, [10:08] and you're doing so on the [10:09] Maury one. [10:15] >> Because that looks like [10:18] it looks like composite [10:19] decking. But this is a [10:20] rendering with the use way. [10:22] I yeah, that's the irony. [10:24] >> Yeah. Could be careful with [10:25] that stuff. That is the reason [10:28] your part that we in your [10:29] pocket prisma of what is true [10:31] city be in the company. [10:33] >> I do fix and flip to [10:35] remodels a night. House [10:37] families there fires and well [10:40] while but you live here, [10:42] I live here. [10:44] Thanks, house. [10:45] It would be this decade a [10:46] little. [10:48] >> I think this can be designed [10:50] in a more Queen Anne style. [10:52] Okay. With the door way, [10:54] that's consistent with the [10:56] design of the House. Really [11:00] composite materials. But [11:02] classic coming prove more [11:04] traditional symbols of a larger [11:07] dimension mean if you say to [11:08] buy to. But this they end up [11:10] being one and a half by one 1 [11:11] of the quarter by one of 3 [11:12] quarter. If you standard stock. [11:14] All right. Lets you get custom [11:16] Millwood. You can do to get a [11:18] true too late to scandal [11:22] and Hughes classic Clifford [11:25] railings and right. I mean, [11:26] yes, that they've got to do all [11:28] that in Stockton. [11:30] And that is I'm still with [11:31] that. This is have an awfully [11:32] suburban look to it in a very [11:35] uncertain neighborhood. [11:37] >> If you have a copy of the [11:39] guidelines for Bruce help. [11:41] >> Yeah, I do. He was nice [11:43] enough to give me the [11:44] guidelines. I didn't know that [11:45] this was a hoping so I'm [11:46] learning distance-learning [11:47] process really. [11:49] So Andrew has been very nice to [11:50] let you know what I can and [11:52] can't do so. So I'm asking [11:53] permission if I can do the [11:54] carriage doors during that [11:56] opening. And if we want a [11:57] smaller that we can do a [11:58] smaller debt. [12:00] >> But for security reasons, [12:01] I really want to sliding door. [12:02] I wouldn't want to let you go. [12:04] That's fine because we're using [12:05] it [12:07] and a tree in the show. [12:08] >> Yeah, I think this. I think [12:09] that's what I need to go back [12:10] to the drawing board for a [12:12] little bit of design. Overall. [12:13] You working with the [12:14] contractors will have the [12:16] contract to the contractor hit. [12:19] Very, very good. [12:20] >> So tell us more about what [12:21] you do. Use it. So I do think [12:24] some flips it. Also house, [12:25] like families like that. [12:26] I have really good management [12:28] own different rentals that the [12:30] midterms. So we primarily [12:32] worked like a recall relocation [12:34] or people that are unhoused due [12:36] to fire floods. [12:38] >> And you, you relocate folks [12:40] of what single-family homes [12:41] that unit. Yes, like [12:43] single-family homes or we have [12:44] a stable of empty single-family [12:46] home where now just hours to. [12:47] >> We're not be know as you [12:49] have and about 20 of them. [12:52] If you own emerges manager I [12:54] own about 6 and I manage for [12:55] other people. [12:57] >> And feel like on interesting [13:00] Brew City. Bnbs is your [13:01] company. Yes, it is. Yeah. [13:02] Okay. You got the next 2 [13:04] matters are before us. Well, [13:06] what is the next one? [13:08] Well, those and yeah, we'll [13:11] certainly have. [13:15] Okay. Yeah. Locations. Okay. [13:18] Yeah. I don't think this one's [13:19] ready for prime time. Yeah. [13:20] Yeah. [13:21] Can you work with her? [13:23] >> Yeah. Absolutely. What's h [13:25] PCs feeling on having a door on [13:27] that facade versus on the rear [13:29] with you? I have a preference. [13:32] >> I would say the rear makes [13:34] which is your guys [13:35] recommendation? Correct? [13:37] Yeah. I would say the rear [13:38] makes more sense in this [13:39] neighborhood. Yeah. [13:41] >> Those are the adorable are [13:42] the perfect [13:45] we are because that there was a [13:46] bump out of the house that was [13:47] added in 1915. So it's good to [13:51] be it would be awkward. [13:54] So having that patio door there [13:56] opens it up from the dining [13:57] room for entertaining spaces [14:00] and I can make it HPC [14:02] appropriate. Yeah. [14:05] >> Yesterday, the same room, [14:06] correct? [14:09] >> Yes, the same role. But it [14:10] just the app or to have the [14:12] door there versus [14:15] this is from the inside of the [14:16] house would be awkward to have [14:17] the door there. [14:23] >> Right now, I think [14:25] my personal and what this is, [14:27] Alice, 3 inches on the side of [14:29] that window for a carriage door [14:31] for that opening. [14:34] >> So you're one house in from [14:36] the corner, but the corner, [14:37] lots vacant. I got to hope [14:39] corner lot, right. But it used [14:40] to be a house or, you know, [14:43] well, no, actually, my grandma [14:45] others ago last year, but [14:47] nearly 8 years ago like that, [14:48] there were no, no, no, my dream [14:50] of their 4 years ago, that was [14:51] house. [14:54] >> Because it's strange that to [14:56] be [14:57] to have a vacant corner. [14:58] I mean, at some point there was [14:59] a [15:02] yeah. There's also a quarter at [15:04] on King Drive that has never [15:06] ever meant to offer some with [15:08] some snow and ice have been a [15:09] house to the [15:11] the whole show on the other [15:12] side here. [15:14] >> And that faces. Yeah, [15:16] the other street, correct? [15:18] That's facing first. Yes. [15:20] Yeah. That's an awkwardly. [15:21] And it just looks like the [15:22] front entrance. [15:23] >> Yeah. Well, yeah. If you'd [15:26] look, I'm lying around [15:28] Google Street view here. [15:30] Right? And this is the [15:33] this is the front of the house [15:35] right there. [15:37] >> Which is diminutive. [15:39] >> Compared to what you're [15:40] proposing [15:43] once one street. [15:45] >> The courthouse is uneven. [15:46] These colors that make it out [15:48] for that color now part of its [15:50] half with a color. Now it's [15:51] green right now, OK, black [15:54] sightings? [15:55] >> Probably being done right [15:56] now as we speak. Yes, so it's [15:57] that staff is she's the [15:58] undergoing a large [15:59] rehabilitation project says [16:01] staff recently approved to see [16:02] a way to remove the [16:03] replacement, citing and she's [16:04] restoring the clobbered, [16:05] citing all will be restoring [16:07] the windows. That. [16:10] >> And your grandma lived [16:11] there. Yeah, 40's 45 years ago [16:13] before I was alive. But look, [16:15] it's already green are ready [16:17] and starting to restore. [16:18] So we're. [16:20] >> There are pictures are [16:21] behind the time. Yeah. Those [16:23] are older street view images. [16:24] Okay. [16:26] Only December 2025. [16:31] I think it needs to go back and [16:32] I think [16:33] that you are correct in your [16:35] app. I will move to deny and I [16:38] will do that and move the home. [16:40] Well, thank you tonight, [16:42] correct. And and [16:45] go back for changes [16:47] that you're suggesting. [16:48] >> And I wouldn't be able to [16:49] come back until next month. [16:51] If you deny to just start over [16:52] again. Yes, we don't want to be [16:54] like, OK, if you hold it, [16:56] you should come back next [16:58] month. Well, sorry. Yeah, [17:00] actually, you still have time [17:01] to deny this one because we're [17:03] not up to deadline yet because [17:04] it's so far out. The hope that [17:06] will move the whole. Yeah. [17:07] Okay. That's fact. Okay. [17:09] To have a second for holding [17:10] this one. 0nd guys on favor. [17:13] Aye. Aye. [17:15] >> You may want to step here. [17:16] Then item to 6, 0, 4, 0, [17:19] 5, resolution going to a [17:20] certificate of appropriateness [17:21] for demolition of a garage at [17:23] 2, 3, 2, 8, East Back Bay [17:24] Street in the North Point South [17:26] Historic District for Bruce Atb [17:28] NBA's company. [17:30] >> Great. Thank you, Mr. [17:31] Chair. So that staff had not [17:33] received final plans for the [17:36] addition or or for the garage. [17:40] So staff's recommending holding [17:41] 3, 4, next month. Perfect. [17:44] >> You have a motion for [17:45] holding items. 3, 4, to almost [17:48] all right. All in favor. [17:50] Aye. All right. All-star [17:52] somebody. Seconded it. Yeah. [17:54] All right. Good. [17:55] >> House to yeah. [17:59] Okay. Very good. Thank you. [18:01] Thank you. [18:03] >> All right. Item 5 resolution [18:05] relating to certificate of [18:06] appropriateness for [18:07] rehabilitation of the Grand [18:08] Department store Mitchell Park [18:10] place at 1, 1, 0, 1, West [18:13] Historic Mitchell Street in the [18:14] Mitchell Street Historic [18:15] District. First when a cotton. [18:22] >> This is a big project, [18:24] but it is also largely [18:26] cosmetic. So I'm going to [18:28] pretty much just going to hit [18:29] the highlights of what's going [18:30] on here. [18:32] It it is nonetheless [18:33] complicated. So I brought the [18:35] whole plan set to announce to [18:36] work. I realize the architects [18:39] on the committee are virtual [18:40] but well [18:45] for the summer. [18:49] So this is the former Grand [18:51] Department store at 11th and [18:53] Mitchell, [18:57] the several combined buildings [18:59] with numerous connections and [19:00] remodeling. Those pieces range [19:02] from a. [19:05] >> In date from 18, 88 18 prior [19:08] to 18, 88 18, 91 1911, [19:13] 1949. And that the primary side [19:18] you're seeing here is a 1937. [19:23] That is a 1937, makeover that [19:26] combined 2 or 3 buildings [19:49] that will move on to plans. [19:55] The plan is essentially to keep [19:57] the first-floor retail and [19:58] community serving spaces and an [20:00] apartment lobby. [20:04] Part of the 11th Street side [20:06] will become a daycare on the [20:08] ground floor. Second floor [20:10] throughout will become a will [20:12] be [20:14] how a apartments. [20:16] So meaning projects remove all [20:21] existing exterior signage. [20:22] None of which is well, none of [20:25] which dates to the era of the [20:27] bill here are the building was [20:29] constructed or to the grands [20:30] operations [20:32] clean and repair the masonry [20:33] with her soco products. [20:36] Existing windows will be [20:38] retained and repaired replacing [20:40] in kind to current conditions [20:42] where necessary [20:44] there appeared to be no [20:46] original windows outside of the [20:48] 1949, edition on 11th Street. [20:53] >> Which is list self section [20:56] that left section list, top [20:59] quarter of the dry, [21:01] very international style. [21:03] Clearly differentiating it from [21:05] the Mitchell Street. Facades [21:06] Art [21:08] Streamline Moderne, [21:10] replace, tinted stand spaniel [21:12] glass again. Mostly on the 11th [21:14] street side of the front [21:16] buildings [21:18] with a new clear glazing [21:20] replace non historic entry [21:21] doors on the 11th street side, [21:25] install 5 new aluminum frame [21:28] home windows on [21:32] the alley side [21:35] right here in the white painted [21:37] brick area to create not new [21:40] windows for apartments on that [21:41] upper level. [21:46] There is no reason to believe [21:47] there are ever been would book [21:48] windows in this building. [21:49] So aluminum is perfectly [21:51] reasonable. [21:55] There's never been a wood [21:56] window in this building to our [21:57] knowledge. [21:58] So adding with what and [22:00] especially on Mitchell Street, [22:02] Ali would be an unusual choice. [22:06] They are a product we have [22:07] proved before. And commercial [22:09] projects graham windows [22:13] repair the roof deck, install [22:15] 12 skylights to out increase [22:18] interior daylight in various [22:20] units and the apartments. [22:25] So overall, a very a good [22:27] project. I do have staff has [22:29] some concerns with the masonry [22:30] quick leaning proposal that [22:32] maybe a little too aggressive. [22:35] It should be. It should be [22:36] phased. [22:39] The purse or kosher. Clean [22:40] light duty, concrete, clean air [22:42] that is proposed for all of the [22:44] surfaces is highly caustic [22:46] and a civic leader. Cleaners [22:48] can only be used on why Sam [22:50] with extreme care and very [22:52] experienced crews who know what [22:53] they're doing. [22:55] Every effort should be made and [22:56] made to clean the building with [22:59] water light surfactants and [23:00] antimicrobials before resort is [23:02] ordering to strong chemicals [23:04] TSB [23:06] tsp. [23:13] If it were if it were glazed [23:15] tile actually tied is [23:16] surprisingly effective. [23:19] Yes, [23:20] we're not a word that from a [23:22] conservatory tried to do my [23:23] fireplace matter at dawn. [23:25] Not gone. [23:29] I don't believe everything. [23:30] Well, apparently, yeah. Super [23:33] much more concentrated than you [23:34] would use in your laundry. [23:35] But it does work the crystal [23:41] but also problem but definitely [23:43] not appropriate for limestone. [23:45] Regardless, [23:47] a black standing of limestone [23:49] should be tested for its [23:50] composition before selecting [23:52] any particular chemical [23:53] treatment suit. And biological [23:55] standing are nearly [23:56] indistinguishable to the naked [23:57] eye and respond very [23:58] differently to cleaning agents, [24:00] especially on stone surfaces [24:05] so that that is the primary [24:07] concern. [24:10] Here's some of the conditions [24:11] of the building. [24:14] There are some bright and [24:16] copper storefront original that [24:18] is painted. The paint will be [24:20] removed. [24:21] The stuff that looks like [24:23] granite is a synthetic granite [24:25] that is basically a a died [24:28] concrete with dark aggregate. [24:31] So it's not actually concrete [24:32] and will be there for actually [24:34] more repairable. Then true [24:36] granite [24:37] less and less obvious [24:41] current second-floor windows [24:43] again, believe not to be [24:44] original but will be capped [24:49] the middle section on 11th [24:51] Street. That is current painted [24:54] 18 90's, brick [24:57] and the highlight of the 1949, [24:59] edition at the south end of the [25:01] building. [25:03] More details on 1949 windows. [25:07] So conditions acquire masonry [25:10] building cleaning permits. [25:11] It is never included in the [25:13] building. Permit is required to [25:14] do separately [25:16] staff to not believe the brick [25:18] on the 1949. Facade is a in [25:21] such condition that harsh [25:22] chemical cleaning is necessary. [25:25] It should be cleaned with water [25:27] and light first surfactant [25:28] except for dealing with [25:30] graffiti. [25:31] But we acknowledge that [25:32] chemical cleaning of this [25:34] limestone lentils on that [25:35] section is probably necessary [25:37] due to the dark standing [25:39] when painting the previously [25:41] painted brick on various decide [25:43] to use a paper certified by the [25:45] man factor as certified for [25:47] brick. And then our standard [25:49] conditions on the pressure [25:50] washing technique [25:52] fan tip minimum distance from [25:54] the building and PS I [25:56] restrictions and gpm [25:58] restrictions. [26:00] Anybody from the developer of [26:03] the U.S. the architect is [26:04] present all good. [26:11] >> He just state your name and [26:13] we're representing sure. [26:15] My name is Courtney Reagan. [26:16] A continuum architects [26:18] represent a client. [26:21] It's going to come clean. [26:23] >> Nasa has any of the [26:24] commissioners have questions [26:26] and all these conditions. [26:28] >> That factory, we are in [26:29] agreement with all those us. [26:31] >> Pretty simple, Ben. All [26:33] right. Second second, all in [26:35] favor, Aye. [26:38] All right. That was easy. [26:39] Thank you. [26:40] >> This is a footnote. This was [26:41] a building that had been slated [26:42] for demolition. [26:44] Amazing which we deny that the [26:46] council granted. And now [26:48] changing plans changed. [26:50] >> Perfect. Same owner. Thanks [26:52] to come. [26:53] That's awesome. Great. So we [26:55] like. [26:57] >> Thank you. Continue mission [26:58] to listen to some of them have [26:59] or you're out how to do it. [27:05] >> Excellent item. 6 to 6, [27:07] 0, 3, 7, 6, resolution really [27:09] into a certificate of [27:10] appropriateness for exterior [27:11] structure, repairs and masonry [27:13] work at 1, 0, 3, 4, North Vel R [27:15] Phillips Avenue Turner Hall and [27:17] individually designated [27:19] historic property for the [27:20] Milwaukee Turner's. [27:23] So here is Turner Hall. [27:25] >> It dates to 18 82. The area [27:29] that is receiving the. [27:33] >> A majority of the work is [27:36] the north shorter two-storey [27:38] north waiting to see. [27:41] >> Here and it's I highlighted [27:43] in yellow with pros areas of [27:46] work. [27:48] >> Proposal is to install. [27:50] She channel bracing across the [27:52] fight primary facade of the [27:53] annex [27:56] and general reporting and make [27:57] some repairs mostly on the [27:59] front of the building but will [28:00] be done as needed everywhere. [28:03] A core of the proposal is to [28:06] bent steel, see channels that [28:08] will be installed on the [28:09] primary facade to improve [28:12] structural integrity is [28:13] channels would be secured to [28:15] the building with metal rods [28:16] run back into the building, [28:17] approximately 8 feet through [28:19] Joyce and rafters. As you can [28:21] see on the drawings here, [28:25] blocking would be added to the [28:26] Joyce and rafters along with [28:27] still roads to begin. A bending [28:29] of this steel is [28:32] required to address the present [28:34] Boeing of the front of the [28:35] building. [28:37] The steel will when installed [28:39] will be painted to be blended [28:41] into the side as best as [28:42] possible. [28:44] So based on the photos provided [28:47] in the file [28:49] staff is somewhat right, [28:50] reluctantly recommending [28:52] approval of this as it is [28:54] presented as a temporary [28:57] stabilization measure. We don't [28:59] have word on long term for a [29:01] timeline, [29:02] but they are doing doing their [29:05] best to stabilize and make it [29:06] is presentable as possible by [29:09] they will be painting was [29:10] painting the steel to blended [29:12] into the brick work. [29:16] The bigger the particular issue [29:19] I have is a 3 pointing of the [29:22] building is right proposed as [29:24] type and order [29:27] from prior experience and pride [29:29] for with reviewers that [29:32] Wisconsin historical society. [29:36] I had an experience with Mark [29:38] Biko where he shall we say [29:40] through a hairy can area about [29:42] using that type and mortar and [29:44] cream city brick. He did not [29:46] allow it to be used anywhere in [29:48] the pop Pabst complex. [29:50] So I think since Turner Hall as [29:53] a national historic landmark [29:55] and perhaps does not, we should [29:57] certainly be upholding the same [29:58] standard and be as careful with [30:00] the brick as possible. [30:02] So the staff is recommending a [30:04] typo order or NHL natural [30:07] hydrology lime order rather [30:08] than type. And there were be [30:10] asked [30:11] too much Portland cement in the [30:12] mix for this except in possible [30:16] locations where it [30:18] some possible locations where [30:20] extreme structural support is [30:21] necessary, but it shouldn't. [30:24] But a natural lime order should [30:26] be sufficient for almost all of [30:28] the work. [30:30] Who's a blue frame building [30:33] criticized separating from the [30:35] wood. [30:36] That is a tough [30:38] as vertical members. [30:43] Yeah. All of the engineer speak [30:44] to that because that was that [30:46] was not drawn in. But you are [30:48] probably correct. [30:50] And then those rights have to [30:52] go through multiple choice. [30:54] Yes. [30:58] >> She had been tougher. [30:59] So sure. Yeah, my name's [31:01] immunity. Tory, I'm the [31:02] executive director of the [31:03] market Turner's the Turner [31:04] Hall, [31:06] Erik Pitt and city manager for [31:08] Turner Hall. [31:09] >> And just being a president [31:11] being engineering, the [31:12] structural engineer for the [31:13] project. [31:15] So the it is a blueprint. [31:17] So to continue is burning wall [31:19] construction and the. [31:22] >> Joyce parallel to the front [31:24] facade ties my folks to get out [31:29] there being difficult today. [31:31] I was out the ring. Was the [31:33] joys parallel to the front [31:35] facade, which is the west [31:36] elevation? [31:38] >> Is there. But the facade has [31:40] separated and there's no direct [31:42] attachment of that. Joyce, [31:44] to the facade, [31:46] a lot of this stem from the [31:48] deep water, deep tunnel project [31:51] and the cracking of the side [31:53] that we've seen evidence of [31:55] that there is far back as [31:57] photographic evidence of that. [31:58] The site is around that time. [32:00] So we've seen cracks in the [32:02] same location appear to be the [32:03] same size. [32:05] So we're just addressing this [32:07] need for lateral stabilization [32:08] that aside, [32:10] because as we know, that can [32:11] tend to lean off the building [32:13] and well into the street some [32:14] time. So we're preparing are [32:16] proposing a temporary [32:17] stabilization of the upper [32:18] side, just a strapping it and [32:21] Emilio American speak with a [32:23] long-term timeline. But [32:25] >> I think the the overall [32:29] intent is to address it. [32:31] It's just temporarily stabilize [32:32] and for now and then proceed in [32:34] the future. We're currently [32:36] looking to get either an [32:37] historic structures report or a [32:40] historic properties master plan [32:42] so that we can more [32:43] strategically go about [32:44] restoring the entire building [32:46] and not just this cosmetic [32:47] stuff. The urgency being in [32:49] this is that it's also my [32:51] my desk, which is going to [32:52] slide off into the parking lot [32:54] of this falls as I sit over [32:55] there. But it's it's a you [32:57] know, it's a gorgeous, lovely [32:58] building and it's alive. [32:59] It's not a museum. And so we [33:01] need to [33:02] making continue another 143 [33:04] years, at least. [33:05] Yeah. And this this is the [33:06] annex structures who wasn't [33:07] part of the original [33:08] construction. But it was very [33:10] bill very soon after the new [33:12] edition from 19, 0, 2, [33:15] >> Pt 13 foot ceiling hike is [33:18] at it. [33:19] If the facade of separated is [33:20] just 2 straps enough. [33:24] >> It's a very it's so it's [33:25] very narrow. It is connected to [33:27] the main building out that it [33:28] hit that original north wall of [33:30] the main building. And I forget [33:33] the exact with of the panic [33:34] structure, but it's it's very [33:36] narrow. The xt rwall on the [33:39] north side is engaged with the [33:41] West side. So we're just [33:43] wrapping that holding it back [33:45] between those 2 [33:46] points of restraint at the [33:48] corners. [33:51] If we're coming back, it feet [33:53] in just to engage the Florida [33:54] diaphragm because we want that [33:56] Florida for him to work and [33:57] bring those loads back to the [34:01] north and the both North Wales, [34:03] the north, while the original [34:04] building on the north wall of [34:05] an extra Qatar. [34:07] >> The rods welded to the [34:09] channel. [34:11] >> No, they did not need to [34:12] know they can be bolted. [34:16] I guess that would put a [34:18] I'm not on the next year face [34:19] of the channel [34:20] in a decorative. Not it could [34:21] be as they're seeing that out [34:23] on a star shape. [34:26] Exactly. Yeah, you know, [34:29] I was sure basically. [34:30] >> Several is actually part of [34:32] the original structure on the [34:33] north face the building. [34:34] So finding something to match [34:35] that. [34:39] >> Fundraisers live, if you'd [34:40] like to contribute, I [34:41] decorative not. [34:42] Yes, [34:47] anybody else have questions? [34:50] >> Yes, Mr. Chairman, I do have [34:51] a question. Go ahead. [34:54] Chairs just being you're [34:57] showing this kind of work to [34:59] stabilize with seems to be like [35:01] the roof and the second floor. [35:03] Would there be any need to do [35:05] this? Channeling [35:09] work at the first floor? [35:13] I don't. I mean, he's an old [35:14] brick facade displacing per [35:16] know. [35:18] >> We've investigated at the [35:20] roof level in the second floor [35:21] level of separation. That's [35:24] where most of the defamation [35:26] occurs and is peeling away. [35:29] It's it's actually [35:30] to house, right. There's a [35:32] window down the center of the [35:33] building and that the side, [35:35] there's one half to the north [35:38] and a half to the south that [35:39] are essentially king that that [35:41] that window location at the [35:44] second floor, not the roof but [35:45] not the lower level. There is a [35:49] you can see the the if you go [35:51] back to the image him the [35:57] the first floor level is about [35:59] 3 feet above the sidewalk and [36:01] location. [36:03] There's a different type of [36:04] wall construction there with [36:06] granite. [36:09] Sorry, not granite state stone [36:12] blocks at the base course. [36:14] So different. Different wall [36:15] construction. [36:19] That cup of Joe. [36:20] >> Okay. That sounds fine. [36:22] I'm just, you know, [36:24] asking that question. [36:26] Sounds good. Looks like proper [36:27] repair. [36:28] >> Historically, when the that [36:30] these were being built, how was [36:32] the purchase sighed attached to [36:33] the site? [36:35] What's it been definitively [36:37] that would be the method of [36:38] attachment. [36:39] >> So this is a solid brick [36:40] bearing wall or is so there's [36:42] no. And in the wall system [36:44] itself, it's it's solid brick [36:46] with the joists that would be [36:48] right up against the inside [36:49] face of that. And there should [36:50] be [36:52] oftentimes there's only one, [36:53] maybe 2 or 3 middle connectors [36:57] clamping that his side to that [36:59] choice. [37:00] We didn't observe any at this [37:02] location to this really isn't a [37:03] traditional balloon [37:04] construction. It's a learned in [37:06] the sense that it's a bearing [37:08] wall that's continuously bill [37:09] that's not interrupted by the [37:10] Florida system on the West [37:12] elevations. You mean Oh, [37:13] yeah, yeah. So no wood, no wood [37:16] wall for a minute. [37:21] >> Any other questions? [37:23] >> The demolition of Bradley's. [37:24] I do confirm that that that [37:26] that was the cause of some [37:27] others that amateurs, that [37:30] search. And I'm just and that [37:31] of the doubt it. [37:33] >> Windows were blown out [37:34] during the demolition. And that [37:36] was that they were I wasn't [37:38] there at the time. And so the [37:39] adequate monitoring that which [37:41] they did say during the [37:42] construction of the new site [37:43] wasn't done and the same way, [37:45] there were multiple points of [37:46] monitoring. All of this is [37:47] Stuart, it by these 2 gentleman [37:49] to my left. This is also the [37:51] first full-time facilities [37:52] manager we've had in my [37:53] lifetime and I'm almost 60's. [37:55] So the stewardship wasn't [37:57] necessarily there. So I can [37:59] only provide anecdotal [38:01] evidence, unquote, some of the [38:02] people saying, yes, but I think [38:03] compounding with the [38:05] the The Deep Tunnel project, [38:08] which is also chronicled is [38:09] having caused damage to the [38:10] annex because that's a [38:12] different [38:13] footing than the rest of the [38:14] building being that that's 18 [38:16] 82. And that's 19. 0, 3, [38:17] all exacerbated the problem [38:25] that all the dust across the [38:26] office after they imploded the [38:28] Bradley Center. [38:32] All right. [38:34] To have a motion on this on. [38:36] >> Tom O. [38:38] >> And the motion is to approve [38:39] with chef conditions. [38:47] >> Nick, we can hear you too. [38:48] Well, [38:52] he's there to even sorry. [38:54] Okay. There you go. Where you [38:55] say something to us. Nic. [38:57] Know a good bit. All right. [38:59] >> Ok, so we've got a motion. [39:01] Do I have a second that all [39:03] right on favor. Aye. Aye. [39:06] Aye motion carries. There we [39:08] go. Thank you. Thank you, [39:09] France. Awesome can. [39:12] All right. We will now take up [39:14] item 7 through 27 as staff [39:17] approve certificates of [39:19] appropriateness to have a [39:20] motion to approve. So most of [39:24] all right, second on the other. [39:26] I I I'm right. [39:30] Well, that's go to item. [39:32] 28, the review and approval of [39:35] the minutes from the last [39:37] meeting on 7/6/2026. All [39:39] commissioners have seen and [39:41] reviewed the minutes to a have [39:44] a motion for approving [39:47] so off. All right. During the [39:48] second. [39:51] All in favor. Aye. All right. [39:53] I updates and announcements. [39:56] I'm just gonna keep putting [39:57] this up here. [40:01] Alright, October 14th through [40:03] the 18th, right? 16, 16, [40:06] sorry. Local history and [40:08] historic Preservation [40:09] Conference downtown Milwaukee [40:11] here. [40:13] Put it on our calendars. [40:16] We'll put it on our calendars. [40:18] All right. Any other updates or [40:20] announcements [40:23] any other any commissioners [40:24] have any updates or [40:26] announcements doesn't feel [40:27] right to close this early, [40:29] but maybe. [40:30] All right. A thing. [40:33] Do you have a motion to [40:34] adjourn? [40:37] >> All right. Second second, [40:39] alright on favor. Aye.