1 00:00:02,440 --> 00:00:02,440 All right. Good evening. I assume everybody's here for the air conditioning only. 2 00:00:08,280 --> 00:00:10,560 this is the montgomery township planning board. Montgomery township, somerset county and new jersey. It's our regular meeting june 23rd, 2025 at 5 p.m.. 3 00:00:17,600 --> 00:00:17,600 and it is our intention to conclude this meeting no later than 8 p.m.. 4 00:00:22,600 --> 00:00:22,600 right now, the time is 502. Under the provisions of the open public meetings act. 5 00:00:29,200 --> 00:00:29,200 notice of the time and place of this meeting has been posted and sent to the officially Designated newspapers. 6 00:00:35,320 --> 00:00:35,320 roll call please. There. Yes. Here. Here. Blodgett. 7 00:00:39,800 --> 00:00:39,800 here. Hamilton. Here. Roberts. Here. Here. Taylor. 8 00:00:45,240 --> 00:00:45,240 todd. Here. Here. You see here. Sullivan. Working on this for michael. 9 00:00:54,800 --> 00:00:54,800 here. Thank you. Okay. Please join me in the salute to the flag. 10 00:01:03,710 --> 00:01:03,710 I pledge allegiance to the flag of the united states of america. 11 00:01:07,950 --> 00:01:07,950 and to the republic for which it stands. One nation under god, Indivisible, with liberty and justice for all. 12 00:01:21,190 --> 00:01:21,190 okay. The first item is public participation for items not on the agenda tonight. 13 00:01:27,390 --> 00:01:31,270 do we have anybody from the public here to ask a question? Make a comment for anything not on the agenda. 14 00:01:37,550 --> 00:01:37,550 okay. Our next item is the master plan. Public hearing and adoption of resolution. 15 00:01:45,190 --> 00:01:45,190 it's the presentation of the master plan 2025, Fourth round housing element and fair share plan dated june 13th, 16 00:01:52,310 --> 00:01:52,310 2025. Just a couple of notes. Here's how I would like to. 17 00:01:58,670 --> 00:01:58,670 can I help you? Yeah. I thought the comments were given by names. 18 00:02:03,190 --> 00:02:05,430 oh, yes. Yeah. Sure. So we can talk about it. It was not part of the. I was about to go over everything. 19 00:02:07,910 --> 00:02:11,750 oh, sorry. Okay, so here's what we're going to do. We're going to start with our presentation from our professional planner, Michael, as well as some potential comments from our, 20 00:02:19,110 --> 00:02:19,110 our town folks. Then we're going to open it up to questions from the board. 21 00:02:25,230 --> 00:02:25,230 okay. So questions directly to michael and or lori from the board. 22 00:02:30,750 --> 00:02:34,110 then we're going to open it to public questions. So questions from the public. Not comments yet. 23 00:02:38,070 --> 00:02:38,070 just questions. Okay. Think of it as michael makes a presentation. 24 00:02:43,310 --> 00:02:43,310 you want to ask him a question. After that, we will then take public comments. 25 00:02:49,790 --> 00:02:49,790 and depending on where we're at and how many folks we have signed up, We will limit that to a certain amount of time and we'll see where we are with sign up 26 00:02:56,660 --> 00:02:56,660 sheet. And then after that we will have a board discussion and potentially a vote Depending on time. 27 00:03:03,100 --> 00:03:03,100 now there is a sign there are two sign up sheets going around, One for questions and one for comments. 28 00:03:09,340 --> 00:03:12,900 is that correct? Well, there's this one right here. Okay. So let's go ahead and pass that around. 29 00:03:23,420 --> 00:03:23,420 okay. So with that we're going to start with with michael. 30 00:03:28,940 --> 00:03:32,060 michael and laurie. Why don't I just swear you in for tonight? Do you both swear from your testimony this evening will be truthful? 31 00:03:35,620 --> 00:03:35,620 yes. Thank you. Okay. Good evening. And thank you. 32 00:03:42,780 --> 00:03:42,780 tonight we're here. The purpose of this hearing is to have the planning board consider the Adoption of the housing plan element. 33 00:03:49,460 --> 00:03:49,460 fair share plan. Addressing montgomery's fourth round obligation to provide opportunities For affordable housing pursuant to the fair housing act of new jersey. 34 00:03:58,740 --> 00:04:02,500 who am I? I'm michael sullivan. I'm with clarke hayden in trenton, New jersey. We're an architecture, planning and landscape architecture firm. 35 00:04:06,260 --> 00:04:09,020 I'm a licensed professional planner in new jersey. I'm certified by the american institute of certified planners. And when I need to be, I'm a licensed landscape architect. 36 00:04:15,100 --> 00:04:15,100 isabel rodriguez, my project manager on this, Is not here with us tonight. 37 00:04:19,540 --> 00:04:22,260 but she was instrumental in drafting of the plan. We serve as the township affordable housing planning consultant, As well as their planning consultant for other matters. 38 00:04:29,700 --> 00:04:29,700 so that's who we are. So the purpose of the hearing, As I said, is to consider the adoption of the 2025 fourth round housing plan element and 39 00:04:37,940 --> 00:04:37,940 fair share plan. The planning board is responsible and vested, Has vested powers through the municipal land use law to adopt the master plan and 40 00:04:47,500 --> 00:04:47,500 elements thereof. Tonight, I'm going to walk the planning board and the public through the Primary points of the plan. 41 00:04:54,010 --> 00:04:54,010 I will answer any questions from the planning board and the public. And then, As the chair said, 42 00:04:59,010 --> 00:04:59,010 public comment will be opened after the direct presentation and questions. 43 00:05:03,330 --> 00:05:03,330 so in 2024, the reason we're here in 2024, the state of new jersey adopted an amended fair Housing act. 44 00:05:10,610 --> 00:05:10,610 and that was pretty important. It abolished the council on affordable housing. 45 00:05:15,410 --> 00:05:15,410 some folks call it coa. Established an affordable housing dispute resolution program, Which is charged with administering and reviewing plans and any disputes. 46 00:05:25,290 --> 00:05:25,290 and it significantly changed how the affordable housing matters in new jersey are Administered. 47 00:05:31,250 --> 00:05:31,250 the affordable housing dispute resolution program is an entity which is really a Clearinghouse for all of the housing plans. 48 00:05:41,210 --> 00:05:41,210 and it's essentially court based. The fair housing act revision amendment was really Instituted, 49 00:05:48,610 --> 00:05:48,610 adopted and enacted in order to remove the courts from the process. 50 00:05:53,160 --> 00:05:53,160 in the third round, we all may remember we all had to file lawsuits in order to protect Ourselves and to get to a point of resolution for our third 51 00:06:02,920 --> 00:06:02,920 round of affordable housing plans. Although that was the intent of the fair act, It didn't work that way, 52 00:06:07,520 --> 00:06:07,520 and the court now manages the affordable housing compliance program. 53 00:06:12,120 --> 00:06:12,120 any disputes or challenges will be mediated by the program, And judges specializing in mount laurel or affordable housing matters will issue 54 00:06:22,000 --> 00:06:22,000 orders as necessary for the process. And michael, If I could just for for the board members and also members of the public what we're 55 00:06:31,040 --> 00:06:31,040 talking about now dates back to 1975 the mount laurel lawsuit that took place in the state Of new jersey. 56 00:06:39,840 --> 00:06:39,840 and then decades later, as we've been seeing rules change and modified within our plan That's available online, 57 00:06:47,720 --> 00:06:51,680 it has a great, very detailed history of all of that. So it's sometimes good to know how did we get where we're at. 58 00:06:55,080 --> 00:06:58,840 so I just wanted to lay that out. It started in 1975. So what does this mean for montgomery township and all the other 400 plus towns who are Participating? 59 00:07:04,760 --> 00:07:04,760 you have to adopt a new fourth round housing plan element and fair share plan. 60 00:07:09,920 --> 00:07:09,920 no later than june 30th. And after you adopt it, You have 48 hours with which to upload your plan to the program. 61 00:07:19,920 --> 00:07:19,920 and it must provide for the fulfillment of your obligation to provide affordable housing Between july 1st, 62 00:07:26,080 --> 00:07:26,080 2025 and june 30th, 2025, which is that's the period that the fourth round covers. 63 00:07:32,080 --> 00:07:32,080 so next tuesday we will be in the fourth round, If anybody's counting. 64 00:07:37,760 --> 00:07:37,760 so there's been some key milestones with respect to montgomery and that is that on january 16th, 65 00:07:45,760 --> 00:07:45,760 16, 2025. I sat here and we held a public information meeting to review, Discuss and answer questions regarding the fourth round and your obligations. 66 00:07:54,670 --> 00:07:54,670 on january 27th, 2025, the township adopted a binding resolution to accept the obligations That were created or calculated by the new jersey 67 00:08:04,590 --> 00:08:04,590 department of community affairs and stipulated to that number and stipulation also that They would submit. 68 00:08:11,230 --> 00:08:14,150 the township would submit a fourth round plan. On january 29th of this year, the township filed a declaratory judgment action with the Program, 69 00:08:19,710 --> 00:08:19,710 which is required a lawsuit in order to establish immunity from builders, Remedy lawsuits during the period where you will be developing and 70 00:08:29,710 --> 00:08:29,710 adopting your plan. On march 26th, the program issued an order saying setting forth your Fourth round obligations. 71 00:08:39,910 --> 00:08:39,910 and so we know that what the obligations are and this plan is going to address it, As I already said, 72 00:08:45,260 --> 00:08:45,260 june 30th, 2025, that's your deadline. And then after you submit there's a period whereby Any challenger could make a challenge to your plan 73 00:08:55,060 --> 00:08:58,660 based on how you've done it or what you've done. And the deadline for that is august 31st and then march of next year. 74 00:09:04,980 --> 00:09:04,980 is the deadline for the adoption of your implementing ordinances. 75 00:09:09,500 --> 00:09:09,500 the housing plan is a master plan element, and the spending plan is adopted by the Governing body and is included in the housing plan element tonight. 76 00:09:16,620 --> 00:09:16,620 but the ordinance is the zoning and other ordinances that are required. 77 00:09:20,780 --> 00:09:20,780 you have some time to develop them. There was a recognition that that does take some time. 78 00:09:24,900 --> 00:09:24,900 so those are our real key milestones and upcoming events. 79 00:09:29,660 --> 00:09:29,660 michael, if I could just let the board members know because actions are also taken by the Township committee. 80 00:09:35,340 --> 00:09:35,340 the township attorney has just dialed in to just hear the proceedings in case there's any Questions from that aspect. 81 00:09:42,740 --> 00:09:42,740 but as you can imagine, with the time frames that michael talked about, She's in another town in a little bit to do this exact same thing. 82 00:09:50,660 --> 00:09:54,060 so we had asked her if she could she could call in. Thank you. It's a very popular assignment lately. 83 00:09:57,700 --> 00:10:00,940 so what's in a housing plan element? Very briefly. The first section contains a lot of required census information. 84 00:10:04,220 --> 00:10:07,220 demographic information that's required by the law. The second section and the section we're going to really be focusing on tonight is how the What the affordable housing obligations are and how we satisfy them. 85 00:10:15,980 --> 00:10:15,980 and what's new is that we have to do we have to document round by round. 86 00:10:20,220 --> 00:10:20,220 so the prior round, the third round and now the fourth round are all documented in there. 87 00:10:24,580 --> 00:10:24,580 the third section is administrative. How do you administer the affordable housing Programs? 88 00:10:29,060 --> 00:10:29,060 in the final section is the spending plan, which talks about how you will utilize your Affordable housing trust funds that accumulate in the trust fund account. 89 00:10:39,660 --> 00:10:43,170 so the big picture, what are your fourth run obligations? The dca issued these numbers back in october, And your present need or rehabilitation obligation is 73. 90 00:10:50,850 --> 00:10:54,650 that's dealing with rehabilitation of existing units. The your prospective need which is envisioned. 91 00:10:56,770 --> 00:10:56,770 you can think of that as new new units that are needed or new credits is 260. 92 00:11:02,530 --> 00:11:02,530 tonight I'm really going to be focusing 99% on the perspective need because that's the Most intricate part. 93 00:11:11,090 --> 00:11:11,090 so there are various compliance mechanisms that you can use in order to satisfy your Obligation. 94 00:11:17,610 --> 00:11:17,610 you can zone you can extend affordability controls on existing units and other things. 95 00:11:26,210 --> 00:11:26,210 so the compliance mechanisms that we have focused on in this plan are first and foremost, We looked at existing affordable units 96 00:11:35,970 --> 00:11:35,970 that would have expiring controls. And these are units that were created 30 years ago. 97 00:11:40,850 --> 00:11:40,850 they had 30 year deed restrictions. Those restrictions will be lapsing during the fourth Round. 98 00:11:47,290 --> 00:11:47,290 so it's an opportunity to extend those. And there's a monetary cost to that. 99 00:11:52,330 --> 00:11:52,330 but you can extend those. And it doesn't create a new unit but it creates a new affordable Credit. 100 00:11:57,810 --> 00:11:57,810 going into the fourth round. So we're focused on that first, Second new inclusionary developments and inclusionary development is a 101 00:12:07,490 --> 00:12:07,490 development that's composed of both market rate and affordable units. 102 00:12:12,530 --> 00:12:12,530 and they're usually a ratio of, you know, 85% to 80%, Market to the rest being affordable. 103 00:12:21,730 --> 00:12:21,730 and that's the theory behind that is that a developer can develop market rate housing and That the, 104 00:12:27,330 --> 00:12:30,850 the profits from that subsidized the creation of the affordable units. It's a very common practice that's been utilized all over the state through all of the Previous rounds. 105 00:12:37,040 --> 00:12:37,040 finally, the strategy here was to maximize the fourth round bonuses of the 260 credits That are required. 106 00:12:44,320 --> 00:12:44,320 65 of them may be bonuses. We have maximized all of the bonus credits that you could use Within the fourth round. 107 00:12:52,480 --> 00:12:52,480 ultimately, the plan that we have results in a surplus of 24 credits that may be carried Into future rounds or used to satisfy a shortfall of 108 00:13:02,480 --> 00:13:02,480 anticipated mechanisms within this plan. The plan has been thought out pretty well in Terms of the capacity of the sites to accommodate the proposed development or the 109 00:13:11,440 --> 00:13:11,440 anticipated development, but you never know. Something could come up on a site and it Shrinks it a little bit, 110 00:13:16,640 --> 00:13:16,640 so you might lose some, or you may not be able to get as many extensions as you thought. 111 00:13:21,760 --> 00:13:25,040 so having a little bit of surplus is not a bad idea. And then there are 22 unused extensions of expiring controls. 112 00:13:30,360 --> 00:13:30,360 they cannot be used in this round, but they may be used in the fifth round. 113 00:13:35,830 --> 00:13:35,830 I can't believe I'm saying fifth round, but that's that's what you could use was. 114 00:13:42,190 --> 00:13:45,030 so let's talk about the extensions of expiring controls. We have 92 of these in the plan. Mckinley court the township is going to extend 60 of Those because they expire in the fourth round. 115 00:13:54,350 --> 00:13:56,430 you cannot wait till the fifth round to do that. But only 38 of those will count now because you have a cap on senior units. 116 00:14:01,230 --> 00:14:01,230 okay. Mckinley commons has 35 family for sale units. 117 00:14:05,710 --> 00:14:05,710 they will be extended. Montgomery glen has 19 family for sale units and those will be Extended. 118 00:14:11,230 --> 00:14:11,230 now there's a little bit difference. These cost money and and the fees or not the fees but The cost of these of obtaining these. 119 00:14:18,150 --> 00:14:18,150 the minimum costs for these new deed restrictions is set by the fair housing act and Newark. 120 00:14:25,270 --> 00:14:25,270 so mckinley court rentals will cost $1,050,000 and that would come from affordable housing Trust funds. 121 00:14:36,070 --> 00:14:36,070 the mckinley commons and montgomery glen units, The for sale owner units and the extensions will cost $1,080,000, 122 00:14:45,350 --> 00:14:45,350 and that total will be funded through the canvey redevelopment noncontiguous cluster, Whereby that will not come out of the township coffers. 123 00:14:57,230 --> 00:15:00,110 I want to talk a little bit about the inclusionary development. So the first one I want to talk about is at 23 orchard, Its existing research office building, 124 00:15:06,030 --> 00:15:08,230 associated parking. They've got a solar field. You can see the aerial up on the plan. The township has worked with the owner of that. 125 00:15:13,550 --> 00:15:13,550 they would like to subsidize their rehabilitation of the existing office building to help Create an innovation hub. 126 00:15:20,990 --> 00:15:20,990 the way they've talked about it. There's a lot of renovation and retrofitting that needs To go on to make it, 127 00:15:26,230 --> 00:15:29,190 to bring it up to today's standards for those kind of uses. And they came to the township and are seeking a residential development. 128 00:15:34,020 --> 00:15:34,020 there was a back and forth on this, and ultimately the township felt that 180 multifamily Units, 129 00:15:40,900 --> 00:15:40,900 these are not senior multifamily units, could be accommodated on the site while continuing The use for the nonresidential portion of it, 130 00:15:48,900 --> 00:15:48,900 and that would produce 36 affordable units. It's located near the intersection of orchard Road and 206, 131 00:15:56,300 --> 00:15:59,660 right near the new jersey transit 605 bus line. So low, close to transit. And the 36 is included in the 180 total units. 132 00:16:06,860 --> 00:16:06,860 and the market rate units would be a mix of one and two bedroom rental apartments. 133 00:16:11,340 --> 00:16:11,340 yes. It's also right across the street from here, So it's near municipal services. 134 00:16:19,260 --> 00:16:19,260 the second inclusionary development I want to talk about is that the can view facility. 135 00:16:26,980 --> 00:16:26,980 there's been a proposal and for 417 total dwelling units. 136 00:16:32,580 --> 00:16:32,580 70 of those units on site would be affordable, And they would be integrated within the market rate units, 137 00:16:38,980 --> 00:16:38,980 which is requirement of uac. At this point, 54 extensions of the affordability controls. 138 00:16:44,500 --> 00:16:44,500 that's mckinley and mckinley commons in montgomery glen would be funded through this, But they would be off site. 139 00:16:53,180 --> 00:16:56,380 so the the way this would be, the ordinance would work. This would be a noncontiguous cluster development that would fall under that. 140 00:17:02,540 --> 00:17:02,540 it's an alternative. This proposal, which is all residential, Is an alternative to another proposal made by this the kennedy folks which would have been 141 00:17:12,140 --> 00:17:15,700 industrial for the most part, research and industrial. And so this is an alternative to that proposal which had a lot of associated truck traffic With it. 142 00:17:23,060 --> 00:17:23,060 and in addition this proposal includes 125 acres that would be dedicated to the township For public use. 143 00:17:33,290 --> 00:17:33,290 in addition to the open space that will be created within the residential area. 144 00:17:39,770 --> 00:17:39,770 the third inclusionary project mechanism that's in the plan is thrive at montgomery Continuing care community. 145 00:17:47,490 --> 00:17:47,490 there's a total independent age restricted units of 127 maximum, And then a minimum of 40 assisted living 146 00:17:57,490 --> 00:17:57,490 memory care units. They kind of juggle back and forth and then affordable assisted living Units. 147 00:18:03,050 --> 00:18:03,050 there will be ten units with 20 medicaid eligible beds. 148 00:18:07,370 --> 00:18:10,690 the credits are by bedroom, so you get 20 credits out of those. And that's part of your senior cap. That's what we can't take. 149 00:18:13,370 --> 00:18:13,370 all those seniors extensions okay. This zone exists right now. 150 00:18:18,610 --> 00:18:21,170 this is part of the redevelopment. Which plan? Which was for country club meadows senior living redevelopment plan, Which was adopted in april of this year, 151 00:18:26,920 --> 00:18:26,920 and it is also the result of a 200 2014 settlement of litigation with the owner of the Property. 152 00:18:34,800 --> 00:18:34,800 and I think just to add to that, prior to the redevelopment plan for this, We did engage with montgomery ems, 153 00:18:42,720 --> 00:18:46,480 which is an all volunteer organization, to talk about this. There is a concern about the increased calls from a facility like this. 154 00:18:52,240 --> 00:18:52,240 and so we talked a little bit about stonebridge and what we could do here. 155 00:18:56,560 --> 00:18:56,560 and so we increased the total number of independent living units, Decrease the assisted living component, 156 00:19:03,120 --> 00:19:03,120 which is what has most of the calls. And so this this project will have 50% less assisted Living 157 00:19:13,520 --> 00:19:13,520 beds than stonebridge. So that was something that was very important to the town and Working with ems on that. 158 00:19:21,200 --> 00:19:21,200 okay. There's there's one unit that I didn't talk about and I didn't put a slide up for. 159 00:19:25,640 --> 00:19:25,640 and that's a village walk. Village walk was just there was just a a new amendment to the Redevelopment plan that was adjacent 160 00:19:35,600 --> 00:19:35,600 to village walk. Village walk, a portion of village walk was made part of that Redevelopment area, 161 00:19:41,400 --> 00:19:41,400 the kepner trigo redevelopment area. As a result of the negotiations for that village Walk, 162 00:19:47,960 --> 00:19:47,960 which has a residential component, already agreed to deed restrict one additional unit Above the 11 that they already had for affordable housing. 163 00:19:56,400 --> 00:19:56,400 it's not creating a new unit, it's just characterizing that as affordable. 164 00:20:00,720 --> 00:20:00,720 right. Taking one of their already approved market rate units and making it an affordable Unit. 165 00:20:06,000 --> 00:20:09,640 right. So there's one I didn't do a slide for. So let's talk about the present need, which is the rehabilitation need. 166 00:20:14,000 --> 00:20:14,000 montgomery township will establish a local rehabilitation program open for eligible owner And renter occupied units. 167 00:20:21,040 --> 00:20:21,040 and that means that somebody who is eligible for low or moderate income housing, But may not have a deed restriction on their place, 168 00:20:28,630 --> 00:20:28,630 but they need improvements or other things like that, That the township can fund a portion of those improvements with a minimum payment and 169 00:20:38,390 --> 00:20:38,390 that as a as a part of that agreement, they would agree to deed restrict their unit. 170 00:20:44,430 --> 00:20:44,430 okay. So that's how that works. That program would be administered by community grants Planning and housing inc, 171 00:20:50,070 --> 00:20:50,070 ccp and commonly known. Who is your administrative agent? 172 00:20:56,110 --> 00:20:56,110 and then that would be money that would be used for that would be paid through the Affordable housing trust fund. 173 00:21:03,230 --> 00:21:06,110 that's your that's how you address the rehab. Need doesn't require the creation of any new units. 174 00:21:11,390 --> 00:21:11,390 so next steps adoption by the planning board. 175 00:21:16,150 --> 00:21:16,150 planning board needs to adopt this plan. No later than june 30th in order to maintain Immunity from builders remedy lawsuits. 176 00:21:23,190 --> 00:21:23,190 I can talk about buildings remedy lawsuits later endorsement by the township committee. 177 00:21:27,990 --> 00:21:27,990 the plan must be endorsed by the township committee, And the spending plan must be adopted by the township committee. That's important because 178 00:21:33,870 --> 00:21:33,870 that this plan requires the spending of funds from the town. 179 00:21:38,550 --> 00:21:41,350 so that's a requirement. Upload to the program. Once the plan is adopted, it's uploaded by your affordable housing attorney to the Program, 180 00:21:46,870 --> 00:21:46,870 and then it's open for public viewing. Beyond just the public viewing that you've provided For. 181 00:21:54,030 --> 00:21:54,030 and then within 30 days, you'll have to file the plan with the new jersey office of Planning advocacy and the somerset county planning board. 182 00:22:01,430 --> 00:22:01,430 that's what you do with any master plan element. So that's where we go with that. 183 00:22:07,150 --> 00:22:07,150 I have a few extra points, guiding principles really, That I think are helpful to understand where the plan came out of and what what drove us 184 00:22:16,790 --> 00:22:16,790 access to public of transportation. It was a priority and a goal for us in round three, So you'll see a lot of that infill development that has taken place along 185 00:22:26,700 --> 00:22:26,700 206 along the new jersey transit route 605 bus line, And we carried that guiding principle into this planned development. 186 00:22:35,380 --> 00:22:35,380 so that 23 orchard road project, which is at a bus stop, It kind of checked that box of what we were trying to achieve 187 00:22:44,980 --> 00:22:44,980 trying to limit development in greenfields. So what areas are already redeveloped that, That that may need to be redeveloped? 188 00:22:54,460 --> 00:22:57,420 and trying to stay out of other areas that were green. Green. Michael already mentioned maximizing those bonus credits because the state sets a Limit on how many and bonus credits come in the form of 189 00:23:07,660 --> 00:23:07,660 if you're redeveloping on a property that's already been developed it's a half a credit. 190 00:23:14,740 --> 00:23:14,740 yeah. So so there's a they have a structure. It used to be in the third round that if you Did rental family housing, 191 00:23:20,170 --> 00:23:23,490 you got a one for one bonus on that. That's gone. Now in redevelopment, if you repurpose a place that has already been developed for non Residential use, 192 00:23:30,250 --> 00:23:30,250 then you get a half credit bonus for that. If you extend controls those extensions of Controls, 193 00:23:35,930 --> 00:23:35,930 get a one for one bonus if it's a rental. So the the mckinley commons get a one for one Bonus on that. 194 00:23:43,210 --> 00:23:43,210 and so utilizing extension of expiring controls, This was our first round that we were able to do that. 195 00:23:48,810 --> 00:23:52,370 so we set that as michael had said as a high priority prior rounds. We we did not have that ability because they were not expiring. 196 00:23:55,850 --> 00:23:55,850 that 30 year deed restriction was not expiring 100% affordable developments. 197 00:24:01,730 --> 00:24:01,730 so in this plan, we do not have any 100% affordable developments, But we do still have them from our prior round. 198 00:24:09,050 --> 00:24:11,890 and one is under construction on this property. So 100% affordable developments while we were not doing any in this round. 199 00:24:17,250 --> 00:24:17,250 we do have them in town, and I'd like to share a little bit about them. 200 00:24:21,570 --> 00:24:21,570 they mean that there are no new market rate units associated with those. 201 00:24:25,810 --> 00:24:25,810 so the two developments that we have, we have a 100% 71 bedroom age restricted development Happening here with the in partnership with the developer 202 00:24:35,010 --> 00:24:35,010 rpm. Those projects need a lot of assistance in financial assistance because there's no Market rate units that are subsidizing them. 203 00:24:44,970 --> 00:24:44,970 so the land is given there's infrastructure improvements that, You know, assistance money from our housing trust. 204 00:24:52,690 --> 00:24:52,690 and then the biggest one is the low income federal low income housing tax credit. 205 00:24:57,490 --> 00:24:57,490 without that, they they would not be able to to do a project like that. 206 00:25:01,810 --> 00:25:01,810 the other 100% affordable housing development, Which is is unique because it's a hybrid. 207 00:25:07,850 --> 00:25:11,810 but we we we like to think creatively here in montgomery. Is the 87 units that are at hartwick and village drive apartments at what is it crossing Sheri montgomery crossing. 208 00:25:21,760 --> 00:25:25,760 so a portion of that was part of an inclusionary development. So some of those units were required as part of montgomery crossing townhouse development. 209 00:25:30,160 --> 00:25:30,160 but at the time, we asked the developer, because of its somewhat close proximity to public Public transportation and walkability to jobs and 210 00:25:39,640 --> 00:25:39,640 shopping, could they do additional units? So I so I believe the number is something like 60 of the 86 211 00:25:49,360 --> 00:25:49,360 units could technically be considered a 100% job. 212 00:25:54,440 --> 00:25:54,440 so the developer gave the land. The developer had the requirement to assist with a portion That met with the townhouse requirement. 213 00:26:03,440 --> 00:26:06,960 but the rest of those units there was assistance from the township. So I guess overall, to understand that while 100% percent. 214 00:26:10,870 --> 00:26:10,870 projects are great that they don't bring market rate and those additional development. 215 00:26:15,430 --> 00:26:18,030 there is a cost. There's a cost to to the township. So we have to be just mindful of that. See, one of the things we wanted to talk a little Bit about what this plan is and what 216 00:26:27,910 --> 00:26:27,910 this plan isn't. To have some clarification. The plan has concept plans in it. 217 00:26:34,030 --> 00:26:34,030 it's kind of setting forth the parameters of what we what we intend to do, But it does not give. 218 00:26:40,670 --> 00:26:40,670 the zoning is not being implemented tonight that those those zoning regulations will be Drafted and public hearings in the future will be held. 219 00:26:49,270 --> 00:26:49,270 we have, I think michael said about a year to do to do that. 220 00:26:53,910 --> 00:26:53,910 and that will take place at the township committee level and then site plan approval. 221 00:26:58,070 --> 00:27:00,990 that happens before your board, as you well know. And so those plans will be more carefully crafted. 222 00:27:05,350 --> 00:27:05,350 certainly with any public comment here and any, Any members of the public that want to come into the planning department and offer some 223 00:27:11,710 --> 00:27:11,710 comments on the draft site plans that would also be considered. 224 00:27:15,830 --> 00:27:15,830 so I think we wanted to just let people know the action that happens with this plan. 225 00:27:21,150 --> 00:27:21,150 and then it's there's subsequent actions that need to be taken. 226 00:27:25,870 --> 00:27:25,870 and I think that was some of the talking points I just wanted to to share in terms of Guiding principles. 227 00:27:31,830 --> 00:27:31,830 so that ends my presentation. Welcome. Any questions from the board of the public? 228 00:27:38,310 --> 00:27:38,310 well, I do have one question. I just want do I have to say my name? 229 00:27:42,830 --> 00:27:42,830 I'm al battle. The 54. I'm reading from my notes so the can view site. 230 00:27:53,030 --> 00:27:53,030 you mentioned that there were going to be 417 units, 70 affordable. 231 00:27:57,750 --> 00:27:57,750 54 of the units are there was some credit given based on montgomery mckinley mckinlay Court, 232 00:28:09,460 --> 00:28:09,460 were you mentioning those there in terms of the credit given for them? 233 00:28:14,980 --> 00:28:18,260 would they be recognized twice for credit? No no no. Go ahead. Let me let me explain that a little. 234 00:28:20,260 --> 00:28:20,260 it's a pretty unique approach. Okay. Essentially ken view will be doing 15% set 235 00:28:30,260 --> 00:28:30,260 aside, and we say set aside. That means 50% 70 units. 236 00:28:34,340 --> 00:28:34,340 the additional 54 are the existing units that are already there which have expiring Controls in the fourth round. 237 00:28:42,220 --> 00:28:42,220 we're including them within that because they will be paying for those extensions. 238 00:28:46,940 --> 00:28:46,940 they will be paying the funds for that. They will not come out of the trust fund, The developers paying it. 239 00:28:51,580 --> 00:28:51,580 so it really turns their set aside from 15, a little over 15% to 26%. 240 00:28:59,220 --> 00:28:59,220 so it's it's a substantial it's a substantial set aside when you look at it in the terms Of the overall set aside for can view. 241 00:29:06,580 --> 00:29:10,500 it's rare to get a 26% set aside. Just doesn't happen. 20%. That's that's usually as high as you can get for sure. 242 00:29:16,780 --> 00:29:16,780 so I had a question. Actually, to continue on to to laurie's last point about kind of what We're doing here tonight. 243 00:29:26,260 --> 00:29:26,260 just to clarify for myself and maybe other board members, Maybe the public, what we're doing here tonight and and it's it's. 244 00:29:32,980 --> 00:29:32,980 so from laurie's last point, you said that this is a plan that is being put forth as a Requirement by the deadline of 245 00:29:42,460 --> 00:29:46,420 june 30th, right? So I just put a mental note. Can you clarify what that requirement is? The specific requirement that is, Is put upon towns. 246 00:29:54,660 --> 00:29:54,660 maybe you should do that now. Okay. And then I'll continue on. Yeah. So the requirement in The fair housing act set the deadline of june 30th for the fifth fourth round and every 247 00:30:04,050 --> 00:30:04,050 subsequent round. They're envisioning this to to carry forth interminably. 248 00:30:11,530 --> 00:30:14,290 so that that's part of the fair housing act. Right. That deadline of june 30th is a requirement for towns to file and be part of the program. 249 00:30:19,930 --> 00:30:19,930 and it means that what that means is. But you but you said something about so the the Indemnity against the 250 00:30:29,530 --> 00:30:32,610 builders. Yes, please. Can you specify that? Yeah. So, so when you filed your jw action and you stipulated to the number of affordable units That you would plan for, 251 00:30:41,210 --> 00:30:41,210 you received and the court accepted it, you got an order giving you immunity through june 30th. 252 00:30:48,490 --> 00:30:48,490 okay. If you do not adopt this plan by june 30th, Then you will be at risk for a builder's remedy lawsuit and a builder's remedy lawsuit. 253 00:30:58,130 --> 00:30:58,130 in case we want to talk about that. Builder's remedy lawsuit is where you don't provide For the zoning or the plan to address your affordable housing obligation. 254 00:31:07,160 --> 00:31:07,160 and a developer shows up and he's and they say, Hey, listen, you haven't done anything. 255 00:31:12,920 --> 00:31:12,920 here's my plan for a thousand units, and I can solve your whole plan. 256 00:31:17,240 --> 00:31:17,240 and you'll argue with them in court and you'll do other things, But ultimately they're going to get to build something and, 257 00:31:25,280 --> 00:31:25,280 and, and you really lose control of your ability to zone and plan at that point. 258 00:31:29,760 --> 00:31:29,760 so yeah, that's I think that's the really important point for me to understand is that This is a plan to provide the township 259 00:31:39,040 --> 00:31:39,040 immunity against a lawsuit by a builder. Correct. 260 00:31:44,040 --> 00:31:44,040 right. But but this specific plan to laura's last point does not approve any of these Sites. 261 00:31:50,560 --> 00:31:50,560 it does not say that the township agrees, because the zoning in these sites will need to Change. 262 00:31:57,280 --> 00:31:57,280 and that will have to happen at a subsequent later hearing, Is that correct? 263 00:32:01,840 --> 00:32:01,840 yes. Yes, yes. So, so this does not give any approval at all for, For the, the sites in this place. 264 00:32:08,120 --> 00:32:08,120 so to take eisenhower's adage plans are worthless, But planning is everything, right? 265 00:32:16,680 --> 00:32:16,680 that's correct. Right. So so these plans are worthless in a sense, But they're everything because we have to have a plan by 266 00:32:26,680 --> 00:32:26,680 june 30th. That's right. Is that right? You have to have it to protect yourselves from a Builder's remedy lawsuit. 267 00:32:32,160 --> 00:32:32,160 right. The other thing is that to your point about the ordinances, In order to do this plan, 268 00:32:37,320 --> 00:32:37,320 we had to have a a legitimate sense of what these sites could accommodate in terms of the Inclusionary development. 269 00:32:43,440 --> 00:32:43,440 we had to have a legitimate sense that these controls were expiring and all the Mechanisms, 270 00:32:47,600 --> 00:32:47,600 we couldn't just say, we're going to do it. It had to be legitimate. And that's why we Have site suitability analysis in here and the deed restrictions that are expiring. 271 00:32:57,560 --> 00:32:57,560 to your point about the ordinances. Those ordinances will be developed post plan. 272 00:33:02,550 --> 00:33:05,950 and as they're developed, they will be introduced by the governing body. They would come back here for consistency review. 273 00:33:08,310 --> 00:33:08,310 and when the consistency review happens, you look at your newly adopted housing plan Element and you say, 274 00:33:13,950 --> 00:33:17,910 oh yeah, they said, ken, you will get 4 in 17 units, 417 units. That looks right. And you can make any comments back that you want on that. 275 00:33:21,430 --> 00:33:23,910 but that's the role that the planning board would play. Or we could say it doesn't make sense. Then totally. 276 00:33:26,870 --> 00:33:26,870 we could. You could totally say that in bringing up builder's remedy. 277 00:33:32,670 --> 00:33:32,670 it's, it's it's something to consider because under what I would consider like a do Nothing scenario. 278 00:33:39,150 --> 00:33:39,150 so we don't we don't have a housing plan. We know that montgomery is a desirable place to Live. 279 00:33:44,550 --> 00:33:44,550 we know that there's housing demand, and we know that we have top schools in the state. 280 00:33:49,750 --> 00:33:49,750 so we know that there would be developers eager to file a builders remedy lawsuit. 281 00:33:55,910 --> 00:33:55,910 suit. One, two. We could. We could have many with that tract. 282 00:34:00,630 --> 00:34:04,270 you are solely subject to inclusionary development. So we're not doing extension of controls, which produces no new units. 283 00:34:08,310 --> 00:34:12,270 we're not doing, you know, extension of senior units. And so you're really looking at that 260 number, Multiplying it by four market rate units, 284 00:34:19,510 --> 00:34:19,510 five five market rate. And so you're talking about a totally different build out in the Township than what we're 285 00:34:29,310 --> 00:34:33,150 proposing. So I didn't run the numbers for the five. I ran the numbers for the four. But we're talking about a thousand, Over a thousand market rate units versus the under the 500 that we 286 00:34:42,990 --> 00:34:42,990 have in this plan right now. And and, and 260 affordable units versus we have less than That in this plan because of the bonus credits and the 287 00:34:52,910 --> 00:34:52,910 extension of controls. So the overall impact of not doing anything in terms of public School children or strain on infrastructure 288 00:35:02,900 --> 00:35:02,900 is is magnified multiple times. If we did nothing because we know that we will be sued Because we are a desirable place to 289 00:35:12,700 --> 00:35:15,900 be. Yeah, there are some communities that don't worry about this. You're not one of them. Yeah, we have to worry about that. 290 00:35:22,780 --> 00:35:22,780 other questions from the board for michael. Lori. 291 00:35:29,260 --> 00:35:29,260 and just just one real quick question. The rehabilitation that you covered, Just very briefly. 292 00:35:34,780 --> 00:35:34,780 yeah. Those are for non deed restricted units today. 293 00:35:39,980 --> 00:35:39,980 correct. Correct. Okay. I mean, I hope that's I don't want to hijack the whole floor, But I do want to have some specific questions 294 00:35:49,940 --> 00:35:49,940 about the can view property specifically I think in incorporation into this plan, Which we've already said the plan is not is not approval for that. 295 00:35:58,130 --> 00:35:58,130 but I kind of would like but once you kind of suggest something, It kind of becomes more of a reality, 296 00:36:06,250 --> 00:36:06,250 which is, is is is is a concern, right? I, I guess I wonder what why the kennedy property Was 297 00:36:17,010 --> 00:36:17,010 considered at, at such a magnitude when, you know, For instance, these other particularly in terms of 298 00:36:27,250 --> 00:36:27,250 the public transportation around the area, the character of the area is significantly Different than characters of other 299 00:36:37,210 --> 00:36:40,890 of another area, for instance, the 23 orchard property. I mean, it seems to me that, you know, right now that zoning does not allow housing, You know, 300 00:36:45,450 --> 00:36:45,450 at all. At all. I believe it's a it's commercial a highway commercial property. 301 00:36:51,970 --> 00:36:55,010 right. Maybe I'm not specifically right about that. It is. Right. So it has no housing on it or not, But we're kind of taking it for granted in some, 302 00:37:01,210 --> 00:37:04,490 in some ways that there's going to be 180 units on that. On which 36 are applied to affordable housing. 303 00:37:09,090 --> 00:37:09,090 that seems a little bit excessive to me from the standpoint that that seems like a much More logical place 304 00:37:18,850 --> 00:37:18,850 to fulfill our obligation, our state mandated obligation for affordable housing. 305 00:37:24,370 --> 00:37:24,370 so that can be you can view approach to the township. 306 00:37:28,690 --> 00:37:28,690 last year maybe sometime and said we're we're moving out of montgomery. 307 00:37:33,770 --> 00:37:33,770 we're relocating all of our offices to a smaller footprint in summit. 308 00:37:38,930 --> 00:37:38,930 and so the last of our employees, which there aren't that many now after covid, Really none came back. 309 00:37:47,290 --> 00:37:50,960 and the last will be out in 2026 and we're going to be marketing it. When we met with them, we said we would like a user in-kind. 310 00:37:55,040 --> 00:37:57,400 that's you know, and they marketed it as such. They hired cbre, which is a national, one of the national top firms for, For commercial real estate and they, 311 00:38:07,840 --> 00:38:07,840 they the, the interested buyer, they didn't they didn't have any buyers at that sort of In-kind swap of like a pharmaceutical company 312 00:38:17,640 --> 00:38:17,640 or whatever. And so the company came in and said, We have a couple of options. 313 00:38:22,760 --> 00:38:22,760 we have the bi-rite plan, which is essentially what does the current zoning permit me to Do? 314 00:38:29,760 --> 00:38:29,760 we don't have the option to rezone it, farming or open space. 315 00:38:34,240 --> 00:38:38,120 that would be a taking of the land. So you're sort of by, Right. What could they do? And that is that light industrial flex space that michael talked about Earlier with the truck traffic. 316 00:38:46,720 --> 00:38:50,080 so we ran some numbers on truck traffic for that. And and so we know that the trucks that exist on our roads right now, We already have complaints. 317 00:38:56,760 --> 00:38:56,760 so adding I think was it 400 and something trucks at a minimum to that area, 400 something trucks per day, 318 00:39:04,640 --> 00:39:04,640 420 per day, 420 per day. So that was so we we we said what other plans do you have? 319 00:39:14,400 --> 00:39:14,400 and so there was a residential plan and that was for a little over 600 units. 320 00:39:20,400 --> 00:39:20,400 so we said, well, we'll get back to you. So then we're working on this plan to back in. 321 00:39:25,560 --> 00:39:25,560 what would we need there? And so we don't need 600 units there to get where we need to be. 322 00:39:31,200 --> 00:39:34,760 and so that's where we sort of arrived and how it sort of happened. And I was talking to someone today about the property and we were you know, I remembered I've been in montgomery a while now, 323 00:39:41,880 --> 00:39:41,880 and I remember when j and j was operating where there were a lot of people coming in and Out of the site, 324 00:39:48,350 --> 00:39:48,350 and that we would get a lot of complaints about the the traffic of those. 325 00:39:52,790 --> 00:39:52,790 a lot of them worked in pennsylvania. So they went, You know, west of the mountain. 326 00:39:56,910 --> 00:39:56,910 so, you know, whether it's a large scale office, Light industrial with trucks, you know, it's it's a site. 327 00:40:04,310 --> 00:40:04,310 but the law allows the property owner to have the development potential. 328 00:40:10,670 --> 00:40:10,670 and so to your point of how did we arrive? Something is happening with this, The property, 329 00:40:15,870 --> 00:40:15,870 they have the right to do something. And so is it going to be something that would bring In truck traffic, 330 00:40:22,350 --> 00:40:22,350 or would it be something that would help us meet our state requirement at a level that is Not in exceedance of what we what 331 00:40:32,270 --> 00:40:32,270 we would need? I'm going to go ahead. I was going to say, And you mentioned it before, but I think it it it's worth mentioning 332 00:40:42,070 --> 00:40:42,070 again what they are going to do potentially if they build this for the credits for our Existing units, 333 00:40:50,740 --> 00:40:50,740 because that that's that's a big addition of credits that we're going to get for the deed Restrictions that are coming up. 334 00:40:57,580 --> 00:40:57,580 correct. Right. They'll be making a payment towards those extension of controls elsewhere In town. 335 00:41:04,500 --> 00:41:04,500 they'll be dedicating 125 acres to the township. 336 00:41:09,820 --> 00:41:09,820 yeah. There are other benefits. Yeah. Can you speak a little more on the extension of Controls? 337 00:41:14,660 --> 00:41:17,420 I find that there is a little bit of confusion with people. Can you reiterate it a little bit that these are, You know, not being new built and that the owners of, 338 00:41:25,300 --> 00:41:25,300 well, who can be would be paying for the township doesn't have to pay for it. 339 00:41:29,460 --> 00:41:29,460 so if you can, you know, elaborate a little more on on that. 340 00:41:34,620 --> 00:41:34,620 on what what is the question. The, the fact that these would can you would be paying for Or can we or the owners would be paying for the extension of the 341 00:41:44,300 --> 00:41:47,620 mckinley, because that somehow is not getting through. Or that's the questions I've heard from everyone is to, You know, the money. 342 00:41:52,260 --> 00:41:52,260 the state does require that there's a payment made to extend the controls. 343 00:41:58,860 --> 00:42:01,780 and so we have an affordable housing trust fund. It's generated by development that is not providing affordable housing, Which because a lot of the development that you see happening in montgomery right now 344 00:42:11,740 --> 00:42:11,740 is part of our round three. It's not generating as much money. 345 00:42:15,940 --> 00:42:15,940 so the affordable housing trust can cover some of the extension of controls, But not all of the extension. 346 00:42:23,060 --> 00:42:23,060 and so that's the negotiation that happened between the township and and the contract Purchaser for the can view property so that they would their whole 347 00:42:32,660 --> 00:42:32,660 obligation would not be developed on site. And part of their obligation will be done Through extension of controls. 348 00:42:39,650 --> 00:42:39,650 so further kind of reducing that overall number that they they would have done right. 349 00:42:46,290 --> 00:42:46,290 I had one question to the can you cite once it's redeveloped for that residential permit, It would be residential only. 350 00:42:55,410 --> 00:42:55,410 it wouldn't be office space or a portion of it be one or the other. 351 00:42:59,970 --> 00:42:59,970 right. It's 100% residential, 100% residential, But varying types. 352 00:43:05,330 --> 00:43:05,330 I mean, they've got when they've described the proposal, There's a variety of types of, of dwelling prototypes say that. 353 00:43:13,730 --> 00:43:13,730 okay. I have a question. It may be a question for the attorneys, But can you elaborate? 354 00:43:21,490 --> 00:43:21,490 if you know, if the attorneys know about the towns that have been subject to builder's Remedies or any other court enforced remedies? 355 00:43:31,450 --> 00:43:31,450 well, I can say that my experience as planning a planning firm and we've this is we've Done. 356 00:43:38,200 --> 00:43:40,440 this is one of 30 plans we've done this year. So and we've been the planners for myriad towns, Both as the planner, the affordable housing planner, 357 00:43:48,160 --> 00:43:48,160 but also as special court masters advising the courts on these things. 358 00:43:53,040 --> 00:43:53,040 we can talk about towns that have lost not just their immunity. 359 00:43:58,680 --> 00:43:58,680 they've lost the jurisdiction over their planning board. 360 00:44:03,120 --> 00:44:03,120 there are towns where the court has said any of these, Any of these proposals come in. 361 00:44:08,160 --> 00:44:08,160 they have to build a residential site improvement standards. You can't add any cost Generative elements to these, 362 00:44:13,800 --> 00:44:13,800 like nice plants or things like this. And by the way, You don't even get to review it. 363 00:44:18,200 --> 00:44:18,200 there's somebody special who's going to review it, And that's all they're going to be looking at. So all the negotiation that's done at the 364 00:44:24,760 --> 00:44:24,760 planning board to massage these to make them fit better in the community, That gets taken away from you. 365 00:44:31,400 --> 00:44:31,400 and and that's the last part of it. The first part of it is they come in and they're going To do a lot more units than you plan for, 366 00:44:38,680 --> 00:44:38,680 and you're going to have to do it. There's nothing that's going to stop the court from Allowing a developer to come in and at some 367 00:44:48,600 --> 00:44:48,600 level do it now. They'll come in big, they'll come in bigger than they need to because They know they might get it reduced, 368 00:44:53,960 --> 00:44:57,440 but ultimately it doesn't end well. And you lose. You lose control of your zoning. You lose control over your review powers. 369 00:45:00,880 --> 00:45:03,000 I mean, these are the worst case. The worst case. There's some really there's been some bad towns out there that have really not complied, And it's been very costly. 370 00:45:10,440 --> 00:45:10,440 I mean, the, the the lawyers and the planners and the engineers and everybody they have Just to to fight with these guys and negotiate. 371 00:45:17,520 --> 00:45:17,520 it is insane how much it costs. So it almost significant implications, Negative implications to not filing a plan. 372 00:45:25,840 --> 00:45:25,840 the way you're explaining it, it almost seems like there might be developers waiting for Towns to not comply so that they can swoop in and try to enforce a the remedy. 373 00:45:34,710 --> 00:45:34,710 do any of the the names of the towns? Just let me just say that they are like the minute That this came out. 374 00:45:40,950 --> 00:45:40,950 I mean, in all of our towns, we've gotten. Oh, By the way, I hear you're doing an affordable housing. 375 00:45:46,070 --> 00:45:48,470 we want to be part of it. Here's our plan. Is it? And it's like blood in the water. And do any of the names of those towns come to mind if You can share? 376 00:45:57,470 --> 00:45:57,470 I don't think it's any secret that south brunswick had their immunity pulled and lost Control of their planning board. 377 00:46:03,910 --> 00:46:03,910 sorry. South brunswick, south brunswick. Englewood cliffs, Let's go ahead. 378 00:46:09,990 --> 00:46:12,590 and michael, you said this is worst case scenario. Best case scenario is we could get double or more number of units anyway. 379 00:46:18,710 --> 00:46:18,710 potentially correct. Okay. Can you can you talk about I don't know if you covered the Timeline of the fourth round and how 380 00:46:28,550 --> 00:46:28,550 long this fourth round window occurs. I mean, This has been over the course of 25, 30 years, 381 00:46:37,350 --> 00:46:40,350 the three rounds, right? Oh, no. No, it goes for 50 years. Yeah, yeah, yeah. Well, the 75 was mount laurel one. 382 00:46:42,950 --> 00:46:42,950 so. Right in 1975, mount laurel one, the court said mount laurel, You're being discriminatory. 383 00:46:49,030 --> 00:46:49,030 you need to have housing in 19. And then nobody did anything. 384 00:46:53,670 --> 00:46:53,670 the towns just said, okay, whatever. In 1983 was mount laurel two. 385 00:46:57,950 --> 00:46:57,950 that's when it got teeth. And then the first round was after 1985. 386 00:47:02,590 --> 00:47:02,590 I guess my specific question is what this is the plan that's due by by a plan that's due By june 30th. 387 00:47:10,710 --> 00:47:14,230 but what is the time horizon which the plan has to be implemented. So so so here's here's what happens june 30th. 388 00:47:17,750 --> 00:47:21,030 let's assume that the plan is filed july 1st. The fourth round starts goes to 2035 june 30th 2035 2035. 389 00:47:28,550 --> 00:47:28,550 you will be developing the ordinances by next march so that there's built development Rights for your inclusionary development. 390 00:47:36,260 --> 00:47:36,260 you'll be doing your rehabilitation program, Getting that geared up. 391 00:47:40,620 --> 00:47:40,620 you will be planning for the extension of controls. 392 00:47:45,300 --> 00:47:45,300 you'll be doing all these things, and you'll be collecting funds through your trust fund That will start. 393 00:47:50,140 --> 00:47:50,140 but you will have to monitor this. And if for some reason, These sites that we have in the plan haven't progressed in five years, 394 00:47:57,340 --> 00:47:57,340 you're going to have to replace them. So you provide the you provide the platform, You provide the ability and the development rights, 395 00:48:06,180 --> 00:48:06,180 the entitlements, so that folks can developers can build these things. 396 00:48:10,380 --> 00:48:10,380 but if they're not progressing for some reason, You'll have to reexamine those and determine whether or not the site was suitable for that 397 00:48:16,060 --> 00:48:18,580 or whether it can accommodate it. And things happen. Right? So there's a monitoring that goes on throughout the, The, the rounds. 398 00:48:24,580 --> 00:48:24,580 and you've been doing that for the third round. The monitoring has been going on. We Monitor units. 399 00:48:29,410 --> 00:48:32,730 what's been built? Did it get a ceo? When was the ceo? You want to know when the ceo was. Because that's when the development controls go on. The Affordability controls. 400 00:48:38,770 --> 00:48:38,770 so they'll be monitoring throughout this. And if at some point one of these sites is not Reasonable or one of these mechanisms doesn't work, 401 00:48:46,970 --> 00:48:46,970 you'll have to replace it. Will they have to be started within that ten year period or. 402 00:48:53,210 --> 00:48:53,210 yes. They know this is this, this they want to see. 403 00:48:58,210 --> 00:49:01,370 they anticipate that everything is built within the third round. Built within the fourth round. So built within, Completed within the fourth round. 404 00:49:05,330 --> 00:49:05,330 that's ten years. Completed by 2035. Yes. Right. 405 00:49:12,810 --> 00:49:12,810 so when is the next? The next threshold? I think you mentioned about nine months. 406 00:49:17,050 --> 00:49:19,650 you said you had to have. Yeah. What was the nine months? Nine months. So a march 15th of next year. All of the ordinances that are necessary to Implement the plan must be adopted. 407 00:49:28,890 --> 00:49:32,490 so it gives you time to work through the details of those. And if those are not adopted, then do we lose the indemnification for the builder's Remedy? 408 00:49:37,050 --> 00:49:41,010 you would be at risk of losing immunity to builders remedy lawsuits. Yes. So in terms of the the number you didn't speak about all about the 409 00:49:50,650 --> 00:49:53,930 township's assessment of. Is that a fair number or not? I assume I assume you went through that process and you think that this is a fair number. 410 00:49:57,850 --> 00:50:01,010 you have no questions about their calculations? Yes. So michael can talk a little bit about that. 411 00:50:03,450 --> 00:50:03,450 but before before he did the analysis on that. 412 00:50:07,610 --> 00:50:09,850 I did get an update from the township attorney. So of the 431 towns that are participating in the state's process, 159 calculated their own number, 413 00:50:18,530 --> 00:50:18,530 meaning, they said to the state, we think our number is lower than your number. 414 00:50:23,490 --> 00:50:23,490 and so those 159 challenge towns aren't challenging that there is a requirement. 415 00:50:29,480 --> 00:50:29,480 they are challenging just that the number that the state set forth was was too high. 416 00:50:34,800 --> 00:50:34,800 so they are all still doing that. As mike will talk a little bit about the number that we Did on our own to assess whether to challenge the number. 417 00:50:45,360 --> 00:50:45,360 our review didn't provide kind of a meaningful difference between the state number and any Number that we could potentially challenge. 418 00:50:52,320 --> 00:50:52,320 and every town that did, did challenge the state got challenged by then, The new jersey builders association and usually the fair housing center share 419 00:51:02,160 --> 00:51:02,160 center. So that's where there's a kind of a meeting of the minds between the state and Those two parties that challenged the town. 420 00:51:09,920 --> 00:51:09,920 and from what I've been told by our township attorney, From what she has seen, less than ten towns had their number approved and that most were 421 00:51:17,880 --> 00:51:17,880 only 4% less than the state number. So in terms of that that dialog. 422 00:51:24,400 --> 00:51:24,400 we did do that exercise to see what could we challenge. 423 00:51:28,640 --> 00:51:28,640 and so I guess the outcome really, of all of that time that the towns that did is that it Really didn't change much. 424 00:51:36,400 --> 00:51:36,400 and that's and that's my experience too, because we have had towns who did challenge the Number, 425 00:51:41,440 --> 00:51:41,440 and we went through the process where you had to appear before a judge and explain, And they had a report, 426 00:51:49,160 --> 00:51:49,160 you did a report and fair share housing center was there. 427 00:51:53,440 --> 00:51:56,320 and they and they well, they do what they do. They don't want any lower numbers. The builders are there. 428 00:51:59,160 --> 00:51:59,160 they don't want any lower numbers. And even to the extent that I think personally, That they didn't comply with the law in there, 429 00:52:07,720 --> 00:52:07,720 saying that our numbers wouldn't comply on the lower towns, They didn't provide any evidence of it, 430 00:52:12,240 --> 00:52:12,240 and the court accepted their non evidence to the challenge. 431 00:52:16,720 --> 00:52:16,720 so these little incremental changes were maybe negotiated, But it was not meaningful. 432 00:52:23,750 --> 00:52:26,670 the only town. The only town. I had one town. So clark came and hence built a statewide model. 433 00:52:29,390 --> 00:52:29,390 we built the same model that the dca built, but we used slightly different factors that The law permits. 434 00:52:34,470 --> 00:52:34,470 and in one town we we did get a roughly 10%, 9% reduction. 435 00:52:44,950 --> 00:52:44,950 but we only got it because the court master or the special adjudicator reviewed our model When we had a little white paper with it. 436 00:52:52,950 --> 00:52:52,950 we reviewed our model and said, you comply with the state law. You're the only firm in the State that did a statewide model. 437 00:52:59,150 --> 00:52:59,150 and they gave them that, but they wouldn't then further adjust it downward based on lack Of developable land. 438 00:53:05,790 --> 00:53:09,630 the lack of developable land was the only factor you could use. And when you look around montgomery and you say, Well, look at all this land, blah, blah, blah, it only considered land in pa three and 439 00:53:16,510 --> 00:53:16,510 less. It didn't consider any pa for land. So if you see things out there that wasn't in It. 440 00:53:22,340 --> 00:53:22,340 so I think that was the best deal we got. And it was only because they relied on our Model, 441 00:53:27,500 --> 00:53:27,500 and our model demonstrated that there was a significant difference. 442 00:53:32,260 --> 00:53:32,260 so your model for round four for us? Yes. The model for you didn't show a dramatic Difference at all. 443 00:53:39,700 --> 00:53:39,700 it was a very minor difference. And my experience from negotiating with this is that if we Had walked in in montgomery with our model, 444 00:53:48,820 --> 00:53:48,820 they might have given us that little bit, but they wouldn't have given us any more. Right. You know, 445 00:53:53,340 --> 00:53:53,340 they wouldn't give you the cherry on top. I noticed that you referred to 100% low cost Housing 446 00:54:03,420 --> 00:54:03,420 in the third round. Did you consider doing that in the fourth round? 447 00:54:08,740 --> 00:54:08,740 and if we were to develop a 100% affordable housing development in the fourth round. 448 00:54:18,420 --> 00:54:18,420 what would be the impact on some place like? Can view of our having dealt with that Problem? 449 00:54:24,900 --> 00:54:24,900 I would I would add, in addition to what I had talked about earlier in terms of the Financial commitment the township would need to make. 450 00:54:32,740 --> 00:54:32,740 that was another conversation that we had had with ems, And the response that they also have had to some of the to the one building that we have 451 00:54:42,220 --> 00:54:42,220 so far. And so that was definitely a consideration that we have two projects now. 452 00:54:48,820 --> 00:54:48,820 and that, you know, maybe we take a break from, From the 100% buildings just to explore other opportunities, 453 00:54:58,020 --> 00:54:58,020 because we had this opportunity for extension of controls, Which we have never had before. 454 00:55:03,500 --> 00:55:03,500 so we really wanted to put efforts, all our efforts towards that as being our number one. 455 00:55:08,900 --> 00:55:08,900 how do we extend those controls, especially on the seniors units, Because we want to make sure that we keep as much affordability in montgomery for seniors 456 00:55:17,130 --> 00:55:17,130 as possible. And so that's I guess that's an answer. 457 00:55:22,530 --> 00:55:22,530 so a 100% affordable project is pretty cost prohibitive for the township. 458 00:55:30,570 --> 00:55:30,570 yes. We would not have any money for it in this round, Given that we're putting the money that we do have towards the extension of controls. 459 00:55:37,850 --> 00:55:37,850 right. Okay. I just have. Oh. Go ahead. I just have another question that was asked by a Resident. 460 00:55:46,690 --> 00:55:46,690 I want to bring up the bi-rite. So if can you if we are not doing housing, Which obviously still far out there and can view the new owners want 461 00:55:56,690 --> 00:55:56,690 to do the light manufacturing. That's the question the resident wanted to. 462 00:56:01,730 --> 00:56:01,730 you had mentioned that it is about 420 trucks a day for all the bays that they would have, 463 00:56:07,530 --> 00:56:10,170 and we can't say anything because that's why. Right. They have that. Is that something that you can explain? 464 00:56:13,890 --> 00:56:13,890 right? They were proposing one point 6,000,000ft² of flex industrial space. 465 00:56:19,210 --> 00:56:19,210 and when we kind of took a look at what that would be with traffic implications. 466 00:56:24,890 --> 00:56:24,890 24 hour trip generation, it would be 402 trucks in and out, 400 to a day. 467 00:56:30,930 --> 00:56:30,930 okay. Any other questions from the board? 468 00:56:40,770 --> 00:56:40,770 okay. Do we have a list of folks that have questions from the public? 469 00:56:48,170 --> 00:56:48,170 penny. Paraiso. Sign myself up first. Hold on, Hold on one second. 470 00:56:55,210 --> 00:56:55,210 miss paraiso, we need to swear you in. Do you swear or affirm your testimony this evening? 471 00:57:01,450 --> 00:57:01,450 we'll be truthful. Yes. And, lori, we have the addresses for all these speakers. 472 00:57:06,450 --> 00:57:06,450 correct. Lori. Lori, do we have everybody's address on there? 473 00:57:13,480 --> 00:57:13,480 no, we do not. All right, miss paris. So do you feel comfortable giving us your address or You okay? 474 00:57:20,000 --> 00:57:20,000 I live at 404 stillman road. Okay. I, I grew up here. 475 00:57:24,520 --> 00:57:27,480 I've lived here all my life. Moved away for a bit. Came back. I remember ken before it was even jay and jay. 476 00:57:32,560 --> 00:57:32,560 anyway question. I have a couple of questions. 477 00:57:36,840 --> 00:57:36,840 the affordable housing piece, and I'm not sure if my math is right. 478 00:57:40,920 --> 00:57:40,920 penny, we're just going. Ma'am, can you pull the microphone towards you? Yeah. Thank you. Thank you. Thank you. Thank you. Penny. You have to literally talk into it. 479 00:57:49,920 --> 00:57:49,920 is that better? There you go. I just want to check and make sure my math is okay. 480 00:57:55,640 --> 00:57:55,640 you said you have to provide 260 units, 260 credits, 260 credits. 481 00:58:02,560 --> 00:58:02,560 so the extendable units that you mentioned are a 1 to 1 credit. 482 00:58:07,440 --> 00:58:07,440 not all of them. The rentals that's a 1 to 1 credit. 483 00:58:12,670 --> 00:58:12,670 okay. That's where my math is off. Because I'm doing math on the fly and I'm like, You're only missing, 484 00:58:17,830 --> 00:58:17,830 like, 16 units, but they're not all one to ones. 485 00:58:23,230 --> 00:58:23,230 I also noticed you didn't mention pike run. Are there any units in pike run that have Extensions available on them? 486 00:58:31,510 --> 00:58:31,510 yes. So pike run has 210 affordable units, right? 487 00:58:36,350 --> 00:58:39,150 they will be expiring over that period of time. We've reached like within these ten years of the fourth round. 488 00:58:42,510 --> 00:58:44,830 okay. But they're not included in this presentation. We reached out to the property owner, and they were not able to agree to extend the Controls. 489 00:58:52,190 --> 00:58:52,190 awesome. Fantastic. And then my other question is, Obviously, we cannot address the 490 00:59:02,110 --> 00:59:02,110 location of some of the ideas here. But my understanding is that generally when builders Come in, 491 00:59:09,550 --> 00:59:09,550 they go at like a 20% rate, 80 to 20, because the can view presentation is at 16% of Affordable to market rate units. 492 00:59:19,550 --> 00:59:19,550 so so first first question. 15% for rentals, 20% for ownership. 493 00:59:25,310 --> 00:59:25,310 and if you zone and you don't have a negotiated plan, Then the way it would be zoned is it would require 15%. 494 00:59:34,030 --> 00:59:34,030 if they are rentals, 20% of their owner occupied for sale units. 495 00:59:38,750 --> 00:59:38,750 okay. In the case of ken view, they're doing around 616% on site. 496 00:59:44,630 --> 00:59:44,630 but because you add in the 54, they're now up at 26%. 497 00:59:50,110 --> 00:59:50,110 okay. Roughly. Hence I say check my math. Other question is and somebody up here is asking About can you came into the process. 498 00:59:59,630 --> 00:59:59,630 just curious if anybody ever reached out to, Say, research park as a potential area of putting in additional apartments. 499 01:00:08,220 --> 01:00:10,740 there's not a lot of building use over there. And it is close to public transport, as you mentioned. 500 01:00:13,580 --> 01:00:13,580 yes. And if that's been explored, by the way, We we did meet with the owner of wall street, 501 01:00:20,740 --> 01:00:20,740 a research park. It's in the airport hazard area. 502 01:00:24,780 --> 01:00:24,780 so it does restrict the amount. There are small areas on the fringes of that development That are outside. 503 01:00:33,740 --> 01:00:33,740 and they they are interested in improving the property as a as a non residential property. 504 01:00:43,180 --> 01:00:45,700 but they were not interested in having housing there. And we we talked to them in round three, round four and that, That we can't force them to do it. 505 01:00:53,660 --> 01:00:56,020 and just, just to be clear about an air hazard. It's not an air hazard but air safety zone. The minimum lot size for for a home in that Area is three acres by statute. 506 01:01:05,130 --> 01:01:05,130 yeah. Over by me. It's five and ten acres. Zoning. 507 01:01:09,730 --> 01:01:09,730 but. But for the purposes of affordable housing, We're not building. Right? So. Yeah, exactly. 508 01:01:13,890 --> 01:01:13,890 we're building multifamily housing, so you're restricted. You can't do it by statute. Okay. 509 01:01:18,810 --> 01:01:18,810 so most of my other questions were answered already. 510 01:01:23,450 --> 01:01:23,450 but I did have one question. And it does pertain to the ken view properties. 511 01:01:29,450 --> 01:01:29,450 and you're talking about obviously, jay and jay can do whatever they want with their Property and sell it to whomever warehouse housing, 512 01:01:37,250 --> 01:01:37,250 whichever. Where does csx come into this conversation for that flat road level road Crossing? 513 01:01:46,610 --> 01:01:46,610 does that become part of any of the equation at this level of conversation, Or does that then kind of come down to the. 514 01:01:56,810 --> 01:01:56,810 detailed conversation of property use. So 601 is the county road. 515 01:02:02,370 --> 01:02:06,130 so the county is part of that conversation as well. And I know that on their plans, they the county has plans for a left turn lane onto Grandview and then there will be other intersection improvements 516 01:02:16,010 --> 01:02:19,450 needed no matter what happens on that property. On the property. So and then just going back to when you were doing the whole can be Affordable housing, 517 01:02:27,650 --> 01:02:27,650 new units versus potential manufacturing when you're talking about the truck traffic, Are we talking about warehouses? 518 01:02:35,610 --> 01:02:35,610 it's flex industrial space. So it is multiple users with different truck bays. 519 01:02:43,690 --> 01:02:43,690 so not necessarily an amazon warehouse, but not excluding it. 520 01:02:50,050 --> 01:02:50,050 but our zoning does not permit a one user warehouse like an amazon. 521 01:02:56,810 --> 01:03:00,130 that's not permitted. But it does permit multi use. Right. But but those late industrial users, they manufacture things. 522 01:03:04,160 --> 01:03:04,160 they're little manufacturing. And so they have to manufacture. So they have to bring in Materials and then they're shipping out goods. 523 01:03:10,200 --> 01:03:13,200 so I have light manufacturing literally across the street from me. So and they're very quiet. And, and I don't want to limit the number of questions. 524 01:03:18,960 --> 01:03:22,440 but I will ask that we want to make sure we give people a chance. And also if you are just going to ask the same question, Please just be understanding of time. 525 01:03:28,840 --> 01:03:28,840 absolutely. For the folks to come up. The rest of them, You'll see me at zoning meetings and planning board meetings if I see me a lot. 526 01:03:36,240 --> 01:03:36,240 thank you so much. Sorry, I don't know my harold wasserman. 527 01:03:49,960 --> 01:03:49,960 name is harold wasserman. I've lived in this town probably 40 years. 528 01:03:55,680 --> 01:03:55,680 sir, we need. Sir, we need to this, sir. Hold on one, Sir, we need to swear you in. 529 01:04:01,320 --> 01:04:01,320 so, do you swear or affirm any testimony you give this evening will be truthful. 530 01:04:05,960 --> 01:04:05,960 yes. Thank you. Okay. Okay. So questions. So my question is, Are are you all comfortable with this, 531 01:04:16,360 --> 01:04:16,360 with this fourth round and the way they kind of force you into things. 532 01:04:22,520 --> 01:04:22,520 are you are you comfortable. Do you think this is right? 533 01:04:29,080 --> 01:04:29,080 tell the truth. Well, I think you you will be you'll be here for the board discussion After everybody's questions and 534 01:04:39,040 --> 01:04:39,040 comments. So here's my next question. There is a group of 27 municipalities that's suing The state of new jersey to address the unfairness of the fourth round 535 01:04:48,520 --> 01:04:48,520 affordable housing law. This is a group if you are uncomfortable with this. 536 01:04:56,590 --> 01:04:56,590 why? You know, it seems to me that this guy is railroading you, You know, into this thing right at the. 537 01:05:04,710 --> 01:05:04,710 okay. Is there. Is there a question, sir? So do you plan to join this group? 538 01:05:12,630 --> 01:05:12,630 that's not for tonight's discussion. So. We we are here to talk about the 539 01:05:22,390 --> 01:05:22,390 plan. Okay. Thank you. Lori. Who's next? Next. 540 01:05:30,790 --> 01:05:30,790 sorry, I at the risk. I'm over speaking. But to honor the man's question, Which I think is a good one. 541 01:05:40,070 --> 01:05:40,070 do we have the authority to make a statement like that? 542 01:05:44,590 --> 01:05:47,870 because I don't think that's in the planning board's purview. Just to be clear. That is a township question. 543 01:05:50,870 --> 01:05:50,870 and I mean, I and that's and and I would agree and I just want to remind everybody, We are not elected officials up here. 544 01:05:59,580 --> 01:05:59,580 right. So but we're not trying to absolve anything, But it's right. 545 01:06:04,620 --> 01:06:04,620 I mean, the the just to be clear, nancy. 546 01:06:15,220 --> 01:06:19,220 I'm a township resident for 25 years. Ma'am. Before you continue. We have your last name. Toledo. Could you spell that? 547 01:06:23,300 --> 01:06:23,300 c a s t e l I n o. Thank you. And do you feel comfortable giving us your address? 548 01:06:31,740 --> 01:06:31,740 yes. 37 fairview road. All right, ma'am, and then we need to swear you in. 549 01:06:36,220 --> 01:06:38,900 do you swear any testimony you give this evening? We'll be truthful. Yes. Thank you. Please proceed with your question. 550 01:06:44,060 --> 01:06:44,060 okay. I've been here for 25 years. And this thing I came to know about the meeting just Yesterday through one of my neighbors. 551 01:06:53,060 --> 01:06:53,060 so it just spurred up. Wanted to know if proper notices were given to the township and Where the neighbors within the 200ft knew that. 552 01:07:03,420 --> 01:07:03,420 and there is a sign that says this contamination on the property can view as that. 553 01:07:09,620 --> 01:07:09,620 and another one about the open space. You know, Is is part of the open space. 554 01:07:14,300 --> 01:07:14,300 I'm a part of another group which is mostly indians, And I've been known there, you know, 555 01:07:19,940 --> 01:07:19,940 for 25 years. And missing is a part of that group. 556 01:07:25,620 --> 01:07:25,620 and I put the question in the same group asking, Does anybody know or anybody knows where the township, 557 01:07:33,020 --> 01:07:33,020 you know, has posted this may or may have put up in the. 558 01:07:37,260 --> 01:07:37,260 we need to shut this group down. And I lost a lot of my friends who went out from that Group. 559 01:07:45,220 --> 01:07:45,220 as you'll see in the last 25 years, we as an indian community has grown quite a bit. 560 01:07:50,780 --> 01:07:50,780 the message that has been sent. That if you come, I have to stop you. 561 01:07:54,890 --> 01:07:58,290 because if you have a comment, we will welcome that, I promise. I just want to get to everybody's question. So is there a specific point? So my question Is using the political office to intimidate people is I don't think is 562 01:08:08,250 --> 01:08:08,250 right. Is that a question? That's a comment. And the question is, Ma'am, I'm sorry, I have to I have to limit you to questions. 563 01:08:15,250 --> 01:08:18,490 I'm really sorry. Is is a proper notice given. That's what I want to know if proper notice. Sherry I believe notice was given. 564 01:08:23,130 --> 01:08:23,130 yes, proper notice was given. For a master plan, Hearing notice is required to be published 565 01:08:32,970 --> 01:08:32,970 in the courier news ten days before it was posted on the township website. 566 01:08:38,890 --> 01:08:38,890 it was transmitted to all the neighboring township or township clerks, And it was sent to the somerset county and to the planning advocacy. 567 01:08:48,650 --> 01:08:48,650 the 200 foot. Notice that you're talking about doesn't come into play until the Application gets submitted to the planning board. 568 01:08:55,770 --> 01:08:55,770 right. Okay. But I did not see it. I thought it was to be in the local because required to Put in the local paper newspaper, 569 01:09:04,330 --> 01:09:04,330 which is mammoth. Yep. So the courier news is our official paper because it must be a Weekly published paper in somerset county. 570 01:09:13,370 --> 01:09:13,370 so when was it put in for? I'm sorry. When was it for the for the municipal land use? 571 01:09:18,170 --> 01:09:20,410 yeah. When was it put in? I'm sorry. When was. When was the information put in on the for for on the 12th. 572 01:09:27,290 --> 01:09:27,290 thursday the 12th. June 12th. Ten days before this hearing. 573 01:09:31,450 --> 01:09:35,330 okay. Because I saw something on the 17th that was sent to me, So I wasn't sure. Okay. No, it was in the courier on the 12th. Yep. 574 01:09:38,210 --> 01:09:38,210 okay. I have the affidavit upstairs, so if you want to stop by tomorrow. 575 01:09:42,650 --> 01:09:42,650 yeah. Yep. Okay. Thank you. Okay. Doug hill. Okay. 576 01:09:51,120 --> 01:09:51,120 okay. What was the name? Doug hill. Doug hill. 577 01:09:57,320 --> 01:09:57,320 here it comes. And again, I just want to remind everybody, When you come up, we're going to ask you for your name, 578 01:10:03,120 --> 01:10:05,680 your address, if you're comfortable giving it. And we are. And we are going to support you, sir. Sir, please. 579 01:10:08,680 --> 01:10:08,680 we need your name and where you live. And then we have to swear you in. 580 01:10:14,400 --> 01:10:18,360 what was that? We need. And we need your address. If you're comfortable giving it. And? And miss casey has to swear you in. 581 01:10:23,600 --> 01:10:23,600 mr. Hill, do you swear or affirm any testimony you give this evening will be truthful. 582 01:10:30,400 --> 01:10:30,400 yeah, I have one comment. What is your contingency plan? 583 01:10:37,800 --> 01:10:37,800 desert contingency plan that you have besides using the can view property? 584 01:10:47,390 --> 01:10:47,390 you don't have one. We do have, as michael described, Some excess credits. 585 01:10:54,950 --> 01:10:54,950 and if we, if the can view property didn't work out for some reason, We would look at other properties. 586 01:11:04,550 --> 01:11:04,550 there's other properties in this town. Yeah, The state on the corner of orchard and burn hills. 587 01:11:11,670 --> 01:11:11,670 why wasn't that considered? Just so you know, Something will happen at the can view property. 588 01:11:18,350 --> 01:11:18,350 they have the right to redevelop that property under the current zoning. 589 01:11:22,590 --> 01:11:22,590 right. So whether it's what's in this plan or something else, Something will happen there. 590 01:11:29,830 --> 01:11:29,830 yeah. We can't prevent a builder from building on property that they own. 591 01:11:33,910 --> 01:11:33,910 so thank you. Thank you sir. Shelly. Jacobs. Shelly. 592 01:11:43,950 --> 01:11:43,950 jacob. My name is shelly jacobson. I live at 309 grandview road. 593 01:11:53,350 --> 01:11:53,350 and do you swear gilman already? And do you swear or affirm your testimony this evening Will be truthful. 594 01:11:58,910 --> 01:12:01,590 absolutely. Thank you. Thank you. And your questions. Okay, so I signed up for both questions and comments. 595 01:12:04,030 --> 01:12:07,750 do you want me to stop with questions, or do you want me to continue? Just just questions. Okay. The question I have, which was not stated is what do you plan to demolish on the ken View property? 596 01:12:19,430 --> 01:12:19,430 so their concept plan has them demolishing everything on the on the property? 597 01:12:24,070 --> 01:12:28,030 pretty much. Okay. I really feel terrible for you. I'm really depressed about all this. You did an excellent job. 598 01:12:32,470 --> 01:12:32,470 I've learned an awful lot about the process, But I'm not sure that you should be aware of this. 599 01:12:40,830 --> 01:12:40,830 I'm not sure that you are aware of the j and j building it was built in, Finished the construction I think 600 01:12:50,740 --> 01:12:50,740 in 1979, maybe occupied in 80. So it's been a good neighbor the whole time I've been here. 601 01:12:58,140 --> 01:12:58,140 so my question is, do you know who the architect was who designed the building? 602 01:13:04,980 --> 01:13:04,980 one person on the board. Yes, I am pei. I am pei. 603 01:13:09,500 --> 01:13:12,260 I am paid. Do you. Have you ever heard of I.m. Pei? I think he did a little thing called the louvre, I believe I. 604 01:13:17,460 --> 01:13:17,460 he is a world class architect. He was responsible for the addition for the louvre. 605 01:13:25,100 --> 01:13:25,100 he built the baltimore willard world trade center and the rock and roll hall of fame for Just a few of his projects. 606 01:13:35,820 --> 01:13:38,300 can I go on? Is this part of my question? Okay. I would prefer that that you would come back for a comment, Which you will absolutely have. 607 01:13:43,180 --> 01:13:43,180 have the opportunity to do. I just wanted to lay that out there, Because there has been no comments made about what happens to the to 608 01:13:53,060 --> 01:13:56,420 the existing buildings. Thank you. Thank you. Thank you. Oh, sorry. Frank. Drift. 609 01:14:06,740 --> 01:14:06,740 frank. Drift. Sir. Can we get your drift? 361 sunset road, Skillman. 610 01:14:15,020 --> 01:14:15,020 alrighty. And do you swear or affirm your testimony this evening will be truthful. 611 01:14:19,140 --> 01:14:19,140 yes. Thank you. I live on sunset road. I've lived here for 82.5 years. 612 01:14:27,580 --> 01:14:30,780 so nobody can tell me anything about montgomery. Right. I was with I went to work for johnson and johnson in 1970. 613 01:14:36,940 --> 01:14:40,130 you know, when we had to get zoning to get them in there. But they came and they did a great job. I'm going to ask you, Why can't they sell it to someone else? 614 01:14:49,530 --> 01:14:52,290 you know, I mean, here we're going to tear this building down. When johnson and johnson just made a statement that they were going to bring, What, $55 billion of work back to new jersey or united states. 615 01:15:02,570 --> 01:15:05,530 why would we tear the building down? Not only that. Building this one over here. I mean, come on, People. 616 01:15:10,130 --> 01:15:10,130 you know, we have ems volunteer. There's there's stress that they're there. 617 01:15:16,010 --> 01:15:16,010 max. The fire company. Nobody thinking about them, But they can't handle it either. 618 01:15:21,730 --> 01:15:21,730 volunteer. We have everybody volunteer. If nina wants to put this over here by the state Property, 619 01:15:30,530 --> 01:15:30,530 that's where it should go. Or by the school. Because you know that the kids could walk to School instead of bussing them. 620 01:15:40,040 --> 01:15:42,960 and that school is going to cost us a fortune. You know, nobody's thinking of these things. You know I love candy. 621 01:15:48,680 --> 01:15:48,680 I started working for them in 1970, and I've been working for them ever since. 622 01:15:53,640 --> 01:15:53,640 johnson and johnson ever since. And I think they've been a hell of a good neighbor. 623 01:15:58,880 --> 01:16:01,880 I would hate to see that knocked down to build houses. You know, years ago that side of mr.. I, I have to limit you to a question. 624 01:16:09,000 --> 01:16:09,000 you certainly can come back for a comment. I want to get to everyone's question questions. 625 01:16:14,400 --> 01:16:14,400 when we had the zoning for that over there, you know, That was considered the least area to live. 626 01:16:22,000 --> 01:16:22,000 so that's why they put that there. Where would you like them to move to or what would you Like to have there? 627 01:16:28,280 --> 01:16:28,280 like that gentleman said before they sold the property, I mean, that johnson and johnson sold the property. 628 01:16:33,800 --> 01:16:33,800 I mean, certified johnson and johnson doesn't own the property you can view. 629 01:16:38,000 --> 01:16:42,000 so they're two different companies, right? How many trucks are they used? Did you say that comes in and out of there today or will the estimate was 402. 630 01:16:49,160 --> 01:16:49,160 never happened? No, I've been there since day one. 631 01:16:53,280 --> 01:16:56,280 I've never seen 24 hour operation. It was never done. This is a different use than what is there now. 632 01:16:59,040 --> 01:16:59,040 same space. You know, I'm telling you, we're making a big mistake. 633 01:17:03,680 --> 01:17:03,680 there are good people. I don't I don't, you know, But it should be zoned for light manufacturing and warehouse just like it is. 634 01:17:14,160 --> 01:17:14,160 thank you. If I could just clarify that the land near the 635 01:17:23,800 --> 01:17:27,200 schools is owned by the state is deed is restricted land. So we wouldn't be able to do an affordable housing development there. 636 01:17:30,880 --> 01:17:30,880 right. Next story. Oh, sorry. Patrick whalen. 637 01:17:38,670 --> 01:17:38,670 no question. Barbara fanning. Cooper. Fanning. 638 01:17:47,590 --> 01:17:47,590 so I remember barbara manning, 284 grandview road. 639 01:17:53,150 --> 01:17:57,150 ma'am, do you swear or affirm your testimony this evening will be truthful? I do. Thank you. So my biggest concerns, and I'm curious of what kind of transportation Will you offer people who need it when they go to. 640 01:18:06,310 --> 01:18:06,310 can you cite. The. The township does not have to offer any transportation. 641 01:18:11,990 --> 01:18:11,990 okay. So they're going to be the people who don't have any transportation will have no Options. 642 01:18:16,750 --> 01:18:16,750 is that correct? I didn't say that. They have cars. 643 01:18:22,350 --> 01:18:22,350 okay. What happens if for right now, the closest highway besides 601, Which has nothing on it, 644 01:18:29,310 --> 01:18:29,310 is five, 18, 518. And or at the other end 206. 645 01:18:34,220 --> 01:18:34,220 you're talking at least, and somebody can help me on this one at least a mile and a half To two miles. 646 01:18:40,940 --> 01:18:44,780 so the question is, how are they going to be able to get back and forth? Right. So what they need, what I would say would be we have really focused on trying to do Infill and redevelopment along that bus line for that 647 01:18:54,740 --> 01:18:54,740 very reason. There is practically no land left that we can redevelop along the bus line. 648 01:19:02,180 --> 01:19:02,180 there are other affordable housing developments like pike run, Which are not in areas that have access to public transportation. 649 01:19:09,940 --> 01:19:09,940 so while we wish we I think we had a more expansive public transit system. 650 01:19:16,620 --> 01:19:16,620 we're not unlike many other suburban communities where we there are gaps in our public Transit, 651 01:19:22,060 --> 01:19:22,060 but we 100% have tried to maximize the number of units that are walkable to retail, Shopping and the public transit line. 652 01:19:31,220 --> 01:19:31,220 okay. Now you're saying if we go into residential, We're going to have how much traffic? 653 01:19:37,940 --> 01:19:37,940 and if we go into commercial, we'll have four, Give or take 100 trucks. 654 01:19:42,820 --> 01:19:42,820 what? How much are you expecting if we do residential per per person? 655 01:19:47,220 --> 01:19:47,220 because you're looking at 417 times 400 or 4 per family. 656 01:19:53,660 --> 01:19:55,860 we'll get that number. We'll look that up for you. If you wanted to ask, would you like to continue to pull that off? 657 01:19:58,860 --> 01:19:58,860 I'm sorry. You want me to continue or do you want me to wait? I think that would be good. Yeah. Are you going to have to put traffic lights up at the corner of 518 or 2 06601 and 658 01:20:08,860 --> 01:20:08,860 grandview. Yes. So with that and we were talking about the the truck, The train traffic. 659 01:20:17,780 --> 01:20:20,820 what's going to happen with that? How is that going to affect us? Because right now when there's the train traffic that backs up and vice versa, The other direction. 660 01:20:29,010 --> 01:20:29,010 yeah. Okay. Are they? Exactly. And is it zoned for trucks? 661 01:20:38,090 --> 01:20:38,090 yes. It's own light manufacturing. Yes. On grandview, Are we? 662 01:20:42,210 --> 01:20:42,210 no, no, I'm talking the roads. I'm talking the roads. Are the roads zoned for trucks? I Know, of course. Grandview and those who live behind me. 663 01:20:49,330 --> 01:20:49,330 we have a bridge at the other end of grandview that has been taken out multiple times by Trucks because they went down and they can't get through. 664 01:20:57,090 --> 01:20:57,090 and I'm talking taken out. I would definitely encourage you to reach out to the state About the trucks, 665 01:21:04,890 --> 01:21:04,890 because we have tried to do weight limits on roads and the state enacted karen, Maybe you could help a law that prohibits towns from 666 01:21:14,810 --> 01:21:14,810 doing that. And the state regulates the weight limits because of the, The, the commerce that they want to, 667 01:21:22,090 --> 01:21:22,090 to have happen in the state. So while we would love to do some of those things. 668 01:21:26,210 --> 01:21:26,210 sometimes we are superseded by the state. That's correct. 669 01:21:30,250 --> 01:21:33,370 think about that. Our roads cannot support. And I'm going to. I was on montgomery ems. I have retired since. 670 01:21:36,490 --> 01:21:36,490 having new ambulances. We have to be careful how we drive down some of those roads, Because we have taken out sides of ambulances, 671 01:21:44,090 --> 01:21:44,090 because our telephone poles are leaning, because our roads are very narrow. 672 01:21:48,210 --> 01:21:48,210 so my question is, what are we going to do if somebody goes down our road, They're going to back up a mile to get to a turnaround, 673 01:21:55,530 --> 01:21:55,530 which has happened multiple times. Things to think about. 674 01:22:02,170 --> 01:22:02,170 we already talked about options for ken view. So I'm just curious of what besides Multi-use is that the only thing they're allowed to use, 675 01:22:08,850 --> 01:22:08,850 or can we do research. Can they look at getting research facilities in there? 676 01:22:15,810 --> 01:22:15,810 they're permitted to do so. What about purchasing for open space? 677 01:22:22,210 --> 01:22:22,210 is that an option? I don't understand the question. 678 01:22:27,520 --> 01:22:27,520 can they purchase can view as an open space if that if that is that anybody. 679 01:22:31,760 --> 01:22:31,760 I mean township whoever. I'm just curious. I, I don't think that the property owner would would sell the option would be we would have 680 01:22:40,760 --> 01:22:40,760 to condemn the property. And I guess the other question was, What kind of tax revenue would we get from a company versus 681 01:22:50,680 --> 01:22:50,680 people who are rent or living there or renting them? 682 01:22:55,800 --> 01:22:55,800 so some of the projections that we've done, the residential is a more productive ratable Than the non residential. 683 01:23:03,720 --> 01:23:06,840 so say that again, the residential is more more productive. Yes. Would produce a higher revenue property tax revenue. 684 01:23:11,520 --> 01:23:11,520 okay. Thank you. Thank you stephanie. Hi, dear. 685 01:23:21,360 --> 01:23:21,360 stephanie. Highview. Okay. Okay. Okay. Jorge desantis. 686 01:23:33,590 --> 01:23:33,590 okay. Jorge. Sanctus. I don't see a need to give my address. 687 01:23:39,550 --> 01:23:42,190 that's fine. Do you live in montgomery, sir? Yes. I've been here for 25 years. Okay. And do you swear or affirm your testimony this evening Will be truthful. 688 01:23:48,110 --> 01:23:48,110 absolutely. Thank you. So I have several questions. 689 01:23:53,510 --> 01:23:53,510 has montgomery ever challenged the state quotas? 690 01:23:57,910 --> 01:23:57,910 and if. If not, why? In recent years, have you ever questioned the quotas? 691 01:24:08,790 --> 01:24:08,790 I believe the answer is no. I am not sure anyone up there could speak to that, Because all of those were done prior to them sitting on the board. 692 01:24:17,590 --> 01:24:17,590 oh, I'm sure, I'm sure this must be common knowledge for something, The gravity of the situation and the amount of housing that's being put into montgomery. 693 01:24:27,270 --> 01:24:30,430 I would think that people would know that answer. My understanding is the answer is no. Given what I've been told. 694 01:24:37,190 --> 01:24:37,190 so the question is, why haven't you question the quotas even for the last round? 695 01:24:45,910 --> 01:24:49,550 does anybody have an answer? Let me let me say this. I'm addressing. I'm addressing the planning board. 696 01:24:53,870 --> 01:24:53,870 well, I'm sorry, what was the question? The question is, Why hasn't montgomery, the planning board questioned the state quotas? 697 01:25:03,990 --> 01:25:03,990 I'm not sure anybody on the planning board was here at the beginning of round three. 698 01:25:08,310 --> 01:25:11,070 was anyone here? Well, for the for the last round. For the last round? Certainly. You've been around for the last year. Mr. 699 01:25:14,390 --> 01:25:14,390 desantis, I believe that the board's planner testified that he had prepared a model, I guess, 700 01:25:23,500 --> 01:25:23,500 statewide model that. Municipalities could rely on in terms of calculating what their unit Allocation should be. 701 01:25:33,260 --> 01:25:33,260 shouldn't montgomery township be the one researching and questioning that model and the Quota, 702 01:25:40,580 --> 01:25:40,580 rather than someone who, in my mind, probably represents a conflict of interest? 703 01:25:46,460 --> 01:25:46,460 I'm sorry. Did I make myself. I didn't hear your last comment, So thank you. 704 01:25:54,740 --> 01:25:54,740 I would think that montgomery township would be the one to research and question these Models. 705 01:26:01,540 --> 01:26:01,540 this gentleman, in my mind, probably represents a conflict of interest in setting these Models. 706 01:26:09,260 --> 01:26:12,780 but that happened in january. Excuse me, but that happened in january. Yes. Okay. I'm going to I'm going to insist that I be able to respond to this? 707 01:26:17,100 --> 01:26:17,100 yeah. Please go ahead. Okay. Please do. My firm is hired by the township. 708 01:26:23,260 --> 01:26:23,260 we're the township affordable housing consultant and and planning consultant. 709 01:26:27,860 --> 01:26:27,860 we work for the township. We develop the model on behalf of, Not the state. 710 01:26:33,140 --> 01:26:37,060 we've developed that model on behalf of all of our municipal housing clients. Only those towns had access to our calculations and the results of the model and the Methodologies in that model. 711 01:26:43,980 --> 01:26:47,380 we shared those results with montgomery township. They revealed a minimis difference between our model and what the state dca had done Pursuant to the law. 712 01:26:56,740 --> 01:26:56,740 there was a decision made. I don't know exactly when it was made that it was not worth Risking the litigation or the challenge involved, 713 01:27:06,540 --> 01:27:06,540 and at that time, we had no idea how that would play out with the program. 714 01:27:11,140 --> 01:27:11,140 we didn't know. We didn't know if we would lose immunity, If we would be in a protracted battle and the decision was made not to challenge the 715 01:27:18,570 --> 01:27:18,570 fourth round number. I'll say this in the third round, All the numbers were negotiated through litigation. 716 01:27:24,410 --> 01:27:27,970 every town that participated there was a number. It came out, it was back and forth. And ultimately you had to have a settlement agreement And a judgment that said, 717 01:27:33,650 --> 01:27:37,290 here's your number and here are your mechanisms for it. And that was fair share. In prior rounds, which preceded the third round, There was no ability to challenge the number. 718 01:27:42,330 --> 01:27:42,330 you were handed a number. It was developed in a black box by the state. 719 01:27:46,970 --> 01:27:50,890 and they handed you the number and you solved as much as you could. So I just want to make the record clear about that and I hope that's helpful. 720 01:27:54,890 --> 01:27:54,890 is this planning done in consultation with developers? 721 01:28:01,810 --> 01:28:01,810 the in terms of the involvement, the planning is done to try to solve for the obligation. 722 01:28:08,730 --> 01:28:08,730 there are developers who have approached the town, And when those developers approach to town, the town considers whether or not there's a 723 01:28:15,080 --> 01:28:15,080 reasonable. It's a reasonable proposal and how it can address the affordable housing. 724 01:28:20,680 --> 01:28:20,680 and those developers who have approached the town that the town felt were on suitable Sites that had a good model for how they 725 01:28:30,560 --> 01:28:34,200 would address the housing, were put into the plan. There's three of them. Okay. You mentioned 400 to 420 trucks. 726 01:28:41,960 --> 01:28:41,960 I'd be curious. What are the assumptions that you made in coming up with this number? 727 01:28:48,480 --> 01:28:48,480 and can this report be made available to the general public so that we can actually look At how these calculations were made? 728 01:29:00,240 --> 01:29:00,240 the. So the concept plan was sent to our traffic engineer, Who then ran the numbers based on the 729 01:29:09,760 --> 01:29:09,760 concept plan. So there's not a formal report, But we could probably prepare some type of information to answer your 730 01:29:19,160 --> 01:29:19,160 question. Thank you. One of the committee members mentioned earlier. 731 01:29:25,120 --> 01:29:25,120 why are we here? It sounds to me like this is a fait accompli. 732 01:29:32,080 --> 01:29:32,080 this is more of an informative evening. All of the questions and comments made by all of These folks. 733 01:29:44,000 --> 01:29:44,000 do they really amount to anything? Because it sounds like nothing's going to change. 734 01:29:49,680 --> 01:29:49,680 if we challenge this, then we are legally liable. 735 01:29:55,280 --> 01:29:55,280 to the developers, we. Montgomery township stands to lose their immunity, And we could be litigated. 736 01:30:02,080 --> 01:30:02,080 so it almost sounds like a form of extortion to me. 737 01:30:08,240 --> 01:30:08,240 is there? No, there wasn't a question in there, But I'll answer a question. 738 01:30:18,150 --> 01:30:18,150 I came to this meeting tonight to learn everything I possibly could, Because I don't look to make any decisions until I get all of the 739 01:30:27,590 --> 01:30:27,590 information from our professionals, as well as get questions and comments from the public. 740 01:30:33,270 --> 01:30:33,270 so I don't know what a fait accompli is in relation to us, But I, I think you heard from the questions from the board. 741 01:30:42,270 --> 01:30:42,270 we asked some pretty specific questions to get answers, But it sounds to me like everything is pretty much set in stone. 742 01:30:53,110 --> 01:30:53,110 we have a june 30th deadline I can't imagine before june 30th and anything is going to Change. 743 01:30:59,910 --> 01:30:59,910 is that correct? What I would say is we had the information session earlier in the winter. 744 01:31:07,350 --> 01:31:07,350 we kind of laid out what our number was and a little bit about the approach. 745 01:31:11,710 --> 01:31:14,910 and so the number is the number and how we approached it. I think we tried to share some of those guiding principles, Some of the challenges we were faced, 746 01:31:20,350 --> 01:31:20,350 some of the decisions that needed to be made by the township, And trying to convey those to you tonight as to why you see the things in the plan and how 747 01:31:29,030 --> 01:31:29,030 we tried to come up with a plan that reduced the total number of new units certainly Protected us from any builders remedy developments, 748 01:31:38,030 --> 01:31:38,030 which would, you know, be far worse than what's in the plan. 749 01:31:42,390 --> 01:31:42,390 extend the controls, especially on those senior citizen units, And maximize the number of bonuses which would not be available to us. 750 01:31:49,790 --> 01:31:49,790 so we tried to lay out what the parameters were, And the plan is quite detailed also to, to go into that. 751 01:31:57,150 --> 01:31:57,150 so in terms of it's more why, why did the town make the decisions that we made that are in The plan? 752 01:32:04,430 --> 01:32:04,430 okay. Lastly. I can't understand why all the residents who live in the areas 753 01:32:14,420 --> 01:32:14,420 of this affordable housing, why they were not sent legal notices informing them as to what Was coming around the corner. 754 01:32:23,420 --> 01:32:23,420 you mentioned that it's this was this was put in the courier. 755 01:32:28,740 --> 01:32:28,740 well, I, for one, never read the courier. And I'm sure there are many residents in Montgomery who don't read the courier, 756 01:32:35,380 --> 01:32:35,380 so that is not a very effective form of communication to montgomery residents. 757 01:32:41,660 --> 01:32:41,660 I think. Everyone here is affected by that. In particular, You 758 01:32:51,620 --> 01:32:51,620 know, anybody who's into these areas where there's going to be an enormous amount of Congestion amongst other issues, 759 01:32:59,180 --> 01:33:02,180 their property values are all going to be affected by this. And I can tell you the house is along. 518 right behind that new development are now up For sale. 760 01:33:08,610 --> 01:33:12,210 I can't imagine that at this point in time that they could. They can even give away those properties. Yep. 761 01:33:16,890 --> 01:33:16,890 thank you. And by the way, we are not here to approve any developments. 762 01:33:22,930 --> 01:33:22,930 we're not. No, I understand that. And if if a builder is ready to present plans, Then yes, 763 01:33:29,250 --> 01:33:33,010 people who live in the area will be noticed directly. Also, this meeting, the plans for the agenda etc. 764 01:33:37,290 --> 01:33:37,290 is always on the website for the township. I understand that, But we're all the residents in these affected areas, 765 01:33:45,730 --> 01:33:45,730 were they notified by mail? If there is a plan for for the builder to build on on the Land, 766 01:33:54,890 --> 01:33:54,890 then they will be. Yeah. Michael. Well we'll also so there's a couple steps here. 767 01:33:59,850 --> 01:33:59,850 this is the master plan. The master plan doesn't create any ordinances. 768 01:34:05,210 --> 01:34:05,210 ordinances are adopted. If a zoning ordinance is changed, The zoning is changed. 769 01:34:10,050 --> 01:34:10,050 there would be notice to 200 foot property owners within that zone and within 200ft of That zone. 770 01:34:15,410 --> 01:34:18,770 so there's a notice when the property is zoned. And there will be a notice for major development applications on those sites. 771 01:34:23,530 --> 01:34:23,530 when a developer would actually come in and do the plan. So those are the two times you'll Get 200 foot notice. 772 01:34:29,010 --> 01:34:31,650 and one of those notices are actually sent out. What recourse do the residents actually have in affecting those plans? 773 01:34:40,490 --> 01:34:43,810 I don't know how to answer that. What is the answer? Well, what I've been telling some of the folks that I've talked to to come into the Planning office or look at the concept plan and zoom with myself or 774 01:34:53,410 --> 01:34:53,410 sherry, talk a little bit about it, and provide feedback and input into what's now a Concept plan and what will become something, 775 01:35:02,800 --> 01:35:05,920 you know, that would go before the planning board to get those comments in. So sherry and I would be available to do that with any residents or some of the folks that I talked to today. 776 01:35:11,080 --> 01:35:11,080 we talked about that. Laura, you testified to me, To me that you you said that there would be a change in there would be a required change 777 01:35:20,120 --> 01:35:20,120 in zoning, which would propagate a either a planning board or a zoning board meeting. 778 01:35:24,680 --> 01:35:24,680 zoning board. Right. Depending on the scale of the change, Probably a zoning board, right? Unless the township committee, 779 01:35:30,200 --> 01:35:30,200 township township committee for a zoning ordinance, It would be referred to the planning board for consistency review. 780 01:35:36,120 --> 01:35:36,120 it would not go to the zoning board. Right. So the planning board then would have a Meeting, and then it would go to the township committee to adjudicate and change the 781 01:35:44,080 --> 01:35:44,080 zoning. At that time, sir, you would then you would be able to speak at a future planning Board meeting, 782 01:35:49,840 --> 01:35:49,840 different opportunities and a future township committee meeting to state your objection to Any, 783 01:35:56,680 --> 01:35:56,680 any specific pacific development. That was why I was trying to say that these plans are Are just planned. 784 01:36:03,590 --> 01:36:03,590 that it's not there's nothing approved here. I understand what the state the state is Mandating that we 785 01:36:13,270 --> 01:36:13,270 provide x number of units for affordable units. 786 01:36:17,910 --> 01:36:17,910 so there's no sounds to me like there's no getting around that. 787 01:36:22,030 --> 01:36:22,030 the state has mandated that. Okay. If sir if you have no other questions, You certainly can come back for comments. 788 01:36:32,110 --> 01:36:32,110 so thank you. Thank you. Okay. Nancy defazio. 789 01:36:46,350 --> 01:36:49,430 ma'am, I'm nancy defazio and I live in skillman. Alrighty. And, ma'am, do you swear or affirm your testimony this evening will be truthful. 790 01:36:54,590 --> 01:36:54,590 I do. Thank you. Questions. My first question was a little bit already addressed, But I just want to clarify because I have personal confusion from some from something that 791 01:37:04,110 --> 01:37:04,110 was said in the january meeting. So my question first is, Is the consultant ever represent the state or consult for the state? 792 01:37:12,870 --> 01:37:12,870 thank you. Sorry. Just my. So this is from confusion from a january meeting. 793 01:37:18,710 --> 01:37:18,710 I'm asking if the consultant ever consults or represents this state. 794 01:37:24,230 --> 01:37:27,110 man, the state's very large. I mean, there are many agencies. No, no, I know. I'm asking, does the consultant ever represent the state of new jersey or Consult or or consult for them? 795 01:37:35,070 --> 01:37:35,070 yes or no? Yes. Okay. Not not as a not an affordable housing. 796 01:37:42,710 --> 01:37:42,710 not not an affordable housing. Correct. Okay. 797 01:37:49,070 --> 01:37:49,070 but I'm trying to, like, make this a simpler question. 798 01:37:53,550 --> 01:37:56,940 so I have a question a little bit about extension of controls. And I'm basing it on something you said. So I'm not sure I understood what you said, But it sounds like because most of the building, 799 01:38:04,820 --> 01:38:04,820 a lot of the building now is related to affordable housing, That less money is coming into some fund that funds the extension of controls. 800 01:38:12,620 --> 01:38:12,620 so my question is where does the money come from for the extension of controls and if There's less money coming in. 801 01:38:18,580 --> 01:38:18,580 is that a tax burden on the township citizens. 802 01:38:24,180 --> 01:38:24,180 so let's say montgomery promenade that's under development right now. 803 01:38:29,060 --> 01:38:29,060 they are not providing affordable housing. So they will pay an affordable housing Development fee when they apply for building permits for each of them. 804 01:38:38,420 --> 01:38:38,420 that money goes into the dedicated affordable housing trust. 805 01:38:42,580 --> 01:38:42,580 and so developments like that pay, pay into it. 806 01:38:46,620 --> 01:38:50,300 and that's the money that we have available to you. So when we talked about the 100% projects. So over the years we've been accumulating our Trust fund. 807 01:38:58,980 --> 01:38:58,980 and so that's why in the last round, we had money available to help subsidize the 100% Affordable projects. 808 01:39:05,820 --> 01:39:05,820 so we've drawn down on that. We're recovering with new montgomery promenade is under Construction. 809 01:39:12,940 --> 01:39:12,940 and so that will that those fees will go into the affordable housing trust. 810 01:39:17,300 --> 01:39:17,300 but in terms of being able to have that financial burden shared between the township's Affordable housing trust fund and 811 01:39:27,380 --> 01:39:27,380 the developer at the can view site, that helps us extend more controls without directly Impacting the general budget of the township. 812 01:39:35,620 --> 01:39:35,620 okay, okay. Just my one one question. Like, so if there's like an 80 over 20 development, Do they give any money to the. 813 01:39:42,060 --> 01:39:42,060 no. So if they build even one unit of affordable housing, They give nothing to that fund. 814 01:39:47,540 --> 01:39:47,540 well, I mean, nobody's building one, but you know what I'm saying? That's correct. If it's An inclusionary development that is doing a set aside, 815 01:39:53,970 --> 01:39:53,970 let's say it's 15% or 20%, they do not pay the residential fee. 816 01:39:59,810 --> 01:39:59,810 however, if you have a mixed use residential and nonresidential like village walk, They will pay developer fees on all the non residential portion of that, 817 01:40:09,770 --> 01:40:13,570 but they will not pay residential fees on the market rate units within that. Okay. And all the money comes from developers and and also homeowners. 818 01:40:19,370 --> 01:40:19,370 if you apply for any additional square footage. 819 01:40:24,130 --> 01:40:27,650 so not interior renovations but additional square footage. That's all by the state. This isn't done by the township. 820 01:40:30,450 --> 01:40:30,450 that's the state as part of the the rules. Okay. 821 01:40:34,690 --> 01:40:34,690 I think that's it. I just need oh, yeah. George basically just asked this question, But I wanted to ask, 822 01:40:43,570 --> 01:40:43,570 are there any changes? I know you guys keep saying this isn't set in stone, But it's hard to believe that, 823 01:40:49,000 --> 01:40:49,000 to be honest. So my question is what is like are there changes at this point that could Result from the public comment? 824 01:40:57,240 --> 01:40:57,240 what are the most effective ways to give input and what changes could possibly result from That input? 825 01:41:03,520 --> 01:41:03,520 like honestly? I want to take a shot, michael. 826 01:41:09,520 --> 01:41:09,520 I mean, I'm I it's speculation. I don't know if you if you own some property that you Would like to use to develop 827 01:41:19,480 --> 01:41:19,480 affordable housing, then that would be a change or could be a change. 828 01:41:23,680 --> 01:41:23,680 so I have to own property I want to develop to make a change in this plan so nobody else Can make. 829 01:41:29,120 --> 01:41:31,120 so public input isn't going to change anything. It's only if you have property to offer. No, I mean that's what she said. 830 01:41:35,320 --> 01:41:39,040 I will answer that question in a future meeting. We could deny the application, whatever future application. We could deny it because it Doesn't meet the plan of the township. 831 01:41:45,240 --> 01:41:45,240 we could. Okay. So so the best way to give is there going to be like ways to give written Comments or just speak at a meeting? 832 01:41:53,360 --> 01:41:56,960 is there anything in particular? Is it the ken view site or is it? I'd like to have a time to develop more questions than what I have right this minute. 833 01:42:02,120 --> 01:42:02,120 and I'm also probably going to meet other people that don't know this is happening. 834 01:42:06,280 --> 01:42:06,280 so I want to be able to tell people, hey, if you have something to say about this, You can write an email to this email address or whatever. 835 01:42:14,040 --> 01:42:14,040 but I need to know what that is or I can't do that. 836 01:42:19,000 --> 01:42:19,000 what I've been telling folks that I've talked to, If they have the the can view plan is a concept plan. 837 01:42:26,280 --> 01:42:26,280 so if so, some of the people that live in the area had had a chance to talk to they can Reach out to me or sherry. 838 01:42:34,640 --> 01:42:34,640 I can give you my email, my phone number. So there's not going to be like a place where You're collecting comments from the general public. 839 01:42:41,320 --> 01:42:41,320 well, I reach out to you personally. Can I ask a clarifying question? 840 01:42:46,990 --> 01:42:49,790 I don't have my glasses on. Hi. I'm here. Okay. Mine are for reading. Are you questioning the the affordable housing plan numbers that We're talking about, 841 01:42:58,950 --> 01:42:58,950 or are you questioning, like, what the can view site could look like? 842 01:43:03,630 --> 01:43:07,430 well, my understanding is that you guys thought of not I don't. If you don't feel like you as part of this, then just exclude yourself. 843 01:43:10,870 --> 01:43:10,870 but my feeling and an impression is that the people running our town think of this as just Something that we have to say yes to, 844 01:43:19,390 --> 01:43:19,390 because the state has passed laws that the process creates a situation. 845 01:43:24,830 --> 01:43:24,830 I'm going to. You're putting me in a position where I'm commenting, But like, you can't say no or you lose your rights. 846 01:43:30,870 --> 01:43:30,870 well, and so so I it's not so my what I want to know is it's you. 847 01:43:37,310 --> 01:43:40,390 it seems to be too. It's too late to object to the numbers. So I guess my question is now we have people might want to object to the plans. 848 01:43:45,670 --> 01:43:45,670 so how? Besides calling somebody personally, How can the general public contact you with input? 849 01:43:51,670 --> 01:43:51,670 okay. And again you're talking about the housing plan not the individual like can view Site. 850 01:43:58,590 --> 01:43:58,590 correct. I don't know. I want to be able if I talk to someone and they say, Oh I don't think it should be at the kennedy site. 851 01:44:05,070 --> 01:44:05,070 it's not just me. If I want to contact one of you, I will do it. 852 01:44:10,150 --> 01:44:13,510 but I'm here. There's other people that don't even know about this meeting. I'm more asking for those people. How do they talk to you if they don't like ken view or They don't like the numbers or I mean the numbers, 853 01:44:21,630 --> 01:44:21,630 it's that's wrong because it's too late. But if they don't like the site or they don't Like the fact that there's not enough exits from the development or whatever that is, 854 01:44:28,430 --> 01:44:28,430 that's a really good question. And I would urge everybody to watch the website look at The. 855 01:44:37,110 --> 01:44:37,110 so you're not going to provide like an email to, To submit like you're telling us. 856 01:44:41,860 --> 01:44:44,260 we all should be gotten constant vigilance. No, No, no. If if yes. Well, well, I am a witness. I'm here, But other people aren't. 857 01:44:51,300 --> 01:44:54,500 because they don't know. Okay, let's let's turn it down a little bit. First of all, I hope you understand. Hope everybody understands. 858 01:44:58,140 --> 01:44:58,140 we are all residents as well. I mean, I hope everybody gets that right. 859 01:45:03,500 --> 01:45:06,780 you were appointed by elected officials. Right. But we are residents of the town. I can assure everybody that when a site plan comes up to The planning board, 860 01:45:15,900 --> 01:45:15,900 there will be sufficient notice. And I believe, Cheri, if someone lives within a certain amount of feet, 861 01:45:23,820 --> 01:45:23,820 miles, yards, 200, 200ft, right, they will get a personal notice in their mail. 862 01:45:30,220 --> 01:45:30,220 so you're not going to provide a collection place for everybody here. 863 01:45:34,460 --> 01:45:37,060 she said she would. Here's the township administrator. The township administrator provided. Oh, thanks for telling me. 864 01:45:41,170 --> 01:45:41,170 okay. That's it. I'm done. Here's here's the thing. 865 01:45:45,250 --> 01:45:45,250 for every. For the township committee, for the planning board, For the zoning board. 866 01:45:51,210 --> 01:45:51,210 if you're we are not supposed to just take comments from people who don't come to the Meeting because they 867 01:46:00,730 --> 01:46:04,290 don't they haven't listened to the presentation. And I remember having an issue. I wanted to speak to the township committee about, And I had a very fussy toddler, 868 01:46:11,810 --> 01:46:11,810 and I had to leave the meeting, and I wanted to leave, Drop off a letter, and they weren't supposed to look at it. 869 01:46:21,530 --> 01:46:21,530 sometimes they say they'll take it as a courtesy, But the comments that come from people who haven't listened to the presentation 870 01:46:32,210 --> 01:46:34,970 they may not know what they're commenting on. So that's my understanding, is why it isn't allowed. 871 01:46:39,530 --> 01:46:39,530 and is that a state law about planning boards not taking letters and petitions and things Like that? 872 01:46:48,410 --> 01:46:48,410 if I could clarify, perhaps it would be helpful in terms of providing comments or asking Questions about what happens 873 01:46:59,770 --> 01:46:59,770 moving forward from the master plan and the housing element, Which the planning board is being asked 874 01:47:09,690 --> 01:47:09,690 to approve. Both the administrator, who's also our planning director and our assistant Planning director, 875 01:47:17,170 --> 01:47:17,170 sherry cruz, have stated tonight their emails are right there on the township website. 876 01:47:24,730 --> 01:47:24,730 any questions? Any information you're looking for, They are available to you. 877 01:47:30,970 --> 01:47:34,130 you send them an email, they will get back to you. In terms of the properties that this plan anticipates will be able to generate affordable Units. 878 01:47:44,840 --> 01:47:44,840 those properties still require adoption of ordinances by the governing body. 879 01:47:52,320 --> 01:47:52,320 those agendas are posted before every meeting. 880 01:47:57,520 --> 01:47:57,520 in addition, each application needs a site plan. 881 01:48:04,400 --> 01:48:06,960 we don't know if they need variances as well. They may. All of you within 200ft will get a notice indicating the application is coming Up. 882 01:48:16,160 --> 01:48:16,160 what is the applicant looking for? Are they looking just for variances. 883 01:48:20,360 --> 01:48:23,280 they also need a site plan. Where are they going to put the buildings. Where are they putting access. What kind of landscaping are they putting. 884 01:48:27,920 --> 01:48:27,920 all of these issues are down the road. It will come in front of this planning board, And all of you will have the opportunity to see the 885 01:48:37,870 --> 01:48:37,870 plans ahead of time to come to the meeting to raise your concerns. 886 01:48:43,590 --> 01:48:43,590 to send comments to the planning director of something particular that bothers you. 887 01:48:49,670 --> 01:48:49,670 the reason for planning board applications not this hearing, But planning board applications. 888 01:48:55,150 --> 01:48:55,150 the reason we require people to come in person is because the state land use law requires Sworn testimony. 889 01:49:04,270 --> 01:49:04,270 if I'm the developer, I'm the applicant. Letters are sent. 890 01:49:09,750 --> 01:49:09,750 I say, well, that's not correct. I would like to question the person who's making these Statements. 891 01:49:16,390 --> 01:49:16,390 suppose you live within 200ft of can view and you feel there is going to be a terrible Traffic 892 01:49:26,470 --> 01:49:29,710 impact. Okay. The developer says, no, that's not true. Or you feel your driveway is going to be impeded and I'm just picking examples out of the Air. 893 01:49:37,550 --> 01:49:37,550 the state land use law requires that you be there so that questions can be asked if you by The board as well. 894 01:49:44,790 --> 01:49:44,790 if you sent a letter and said it's going to ruin my landscaping. 895 01:49:49,670 --> 01:49:49,670 okay. How is that going to happen? Tell us. The board wants to know. 896 01:49:55,150 --> 01:49:58,190 the developer may say, well, I'd like to know, Too. Maybe there's a way I can alleviate that. So I don't know if that's helpful, But that's the reason why at planning board 897 01:50:07,550 --> 01:50:07,550 applications, we need you here in person. Deborah keenan. 898 01:50:26,230 --> 01:50:26,230 keenan keenan skillman and miss keenan, do you swear or affirm any testimony you give this Evening will be truthful? 899 01:50:34,740 --> 01:50:34,740 I do. Thank you. So in the state plan, when they were coming up with a 260 that number, They kept certain portions 900 01:50:44,660 --> 01:50:44,660 of properties out. It was considered rural or so forth. 901 01:50:49,860 --> 01:50:49,860 so, mike and one of those properties is considered rural is actually in the ken view area. 902 01:50:54,540 --> 01:50:54,540 so it wasn't put in as a developable site for affordable housing in the state's Calculation. 903 01:51:00,820 --> 01:51:00,820 so aren't you are we concerned that when the state calculated that montgomery's number, That the rural properties that were excluded and 904 01:51:10,740 --> 01:51:10,740 can view is now going to be included? Are we concerned that this could change the state's Calculations because we are opting in properties 905 01:51:20,700 --> 01:51:20,700 that they would they did not include in their own calculations. 906 01:51:25,540 --> 01:51:25,540 can I ask you a clarifying question on that, Deborah? Because I think it's a great point. So are you specifically, 907 01:51:30,980 --> 01:51:30,980 are you testifying now that that that when the state determined the 260 that the can view Site specifically was not a part of their calculations? 908 01:51:40,700 --> 01:51:40,700 is that what you're correct. It was. Thank you of the property because it was rural. 909 01:51:47,940 --> 01:51:47,940 it's testimony. Can you confirm that that that testimony, Miss aaron? 910 01:51:52,980 --> 01:51:52,980 well I if I to answer the question, the whether it's in or out would not change your Number at all. 911 01:52:00,900 --> 01:52:00,900 but but the state calculated we're throwing in properties and saying they could come back And say hey then all of montgomery is included in this. 912 01:52:08,980 --> 01:52:11,900 the court has set the number. The number cannot change. Okay. So there's no concern about that. Okay. 913 01:52:14,500 --> 01:52:14,500 so if I look at the can view properties there's it's made up of four lot blocks. 914 01:52:19,340 --> 01:52:19,340 okay. The one that there the developer is considering donating is not in the sewer system Area anyway. 915 01:52:26,930 --> 01:52:26,930 so, you know, if they sold it to a developer, The most, they could put in this 12 houses because it's mountain zoned right around their 916 01:52:33,170 --> 01:52:33,170 mountain residential. So I don't think that really kind of comes in calculation wise. 917 01:52:38,650 --> 01:52:38,650 and then the other portion that is in there, Which is the commercial aspect, it is 160 acres. 918 01:52:46,410 --> 01:52:46,410 so if you look at 160 acres and the zoning mountain zoning, It would only mean a developer could come in there and put in 16 if you switch it to 919 01:52:55,210 --> 01:52:55,210 residential, or if you did it residential five, It would be a maximum of 32. 920 01:53:01,490 --> 01:53:05,130 or even if you did the r-2 zoning, it would be a maximum of 80. And now we're talking 417. Okay. This is in an area that is southlands. 921 01:53:11,810 --> 01:53:11,810 it's considered very sensitive. So why would we all of a sudden say oh 412 is, Is totally fine. 922 01:53:18,290 --> 01:53:18,290 that's very problematic I think. Does anyone concerned about those numbers. 923 01:53:24,050 --> 01:53:24,050 yeah. Can I ask you a clarifying question? Did your 160 acres include the wetlands also, Which would be reducing? 924 01:53:34,080 --> 01:53:37,240 I don't even know. All I know is it's the. So 14. If you look at the block and lock number 14 I'm going to assume it's this is the part that Is possibly developable because 14. 925 01:53:48,400 --> 01:53:48,400 is it 14001 lot two. There's a portion that's property class code of four eight, Which is commercial. 926 01:53:55,080 --> 01:53:55,080 that's what they're getting. The what we get as a township, The highest level of taxation on that commercial. 927 01:54:00,560 --> 01:54:00,560 and that is it. It's valued right now a net of $41 million. 928 01:54:05,720 --> 01:54:05,720 right. That is the 140, sorry, 160 acres. There is another parcel that there is qualified As farm on that same side in 929 01:54:15,520 --> 01:54:15,520 that I would call sewer area. And that is qualified as farm and that is 97 acres. 930 01:54:22,800 --> 01:54:26,200 so I don't know how developable it is or not. But even if you said, hey, the whole thing could be, We're still talking. 931 01:54:30,760 --> 01:54:30,760 if it was, that's a total of 257 acres. That would be for ten acres owning. 932 01:54:35,640 --> 01:54:35,640 it's 25 buildings. It's 25 houses. We're not 417. 933 01:54:39,880 --> 01:54:43,720 if you did five acres zoning, it's 51 housing, Even two acres. It's 128 a lot, right? But nowhere near 400 something units. 934 01:54:48,840 --> 01:54:48,840 so I just don't know if that is, has that been brought into any kind of consideration when Just switching from commercial to residential? 935 01:54:58,200 --> 01:54:58,200 so I know that the state has smart growth goals in the state plan, Which is being formulated and finished now. 936 01:55:05,840 --> 01:55:05,840 and so areas with existing development like the can view site would be sites they would Recommend for redevelopment, 937 01:55:13,840 --> 01:55:13,840 because they're not we're not expanding on footprint that hasn't already been degraded. 938 01:55:18,880 --> 01:55:22,870 so that would be the 160 acres because the rest has not been developed. Correct. Okay. So it sounds from I know this would go in front of the township committee And zoning and stuff, 939 01:55:27,750 --> 01:55:31,350 but it seems to me very problematic that this parcel is even in there. Who owns who currently owns the property? We're working with the contract purchaser. 940 01:55:37,710 --> 01:55:37,710 okay. But it's currently owned by ken view, aka johnson and johnson. 941 01:55:42,230 --> 01:55:42,230 so if you look at the deed and stuff, I think it still says johnson and johnson, Who made the determination from a corporation to leave montgomery and to go to summit. 942 01:55:49,750 --> 01:55:49,750 right. So that is and we that's a significant amount of taxes that we get as a township For that property. 943 01:55:57,550 --> 01:56:01,550 my sense is that I don't know what we're doing to make life better for them. They own the property. They're going to have to keep paying the taxes on that. 944 01:56:05,110 --> 01:56:07,990 we should find the right thing that fits for montgomery. So switching it from commercial to residential, There be better be a very, very, very good reason. 945 01:56:14,670 --> 01:56:17,550 a huge benefit for montgomery to even consider doing this. And I don't think just a couple of things, and they're trying to buy out of something Affordable housing. 946 01:56:22,510 --> 01:56:22,510 is that so? I'm sorry it wasn't a question on that one, But I did want to clarify some of those things. 947 01:56:29,830 --> 01:56:29,830 and then this idea that there is more taxes that would come in residential taxation versus Commercial taxation, 948 01:56:35,870 --> 01:56:35,870 it's also how much how much of that tax dollars do you actually use generally? 949 01:56:40,830 --> 01:56:44,430 commercial. They don't use a lot of the services within the town. So then to switch it to residential, it's huge. 950 01:56:46,470 --> 01:56:46,470 it's massive. And so they're not equal. So my question is for plan b right. 951 01:56:54,350 --> 01:56:54,350 the old municipal building site was that considered. 952 01:56:58,750 --> 01:56:58,750 it was in a prior plan. But that project has moved down to this property, The 100% seniors to be closer to public transportation because there's not public 953 01:57:08,430 --> 01:57:08,430 transportation up there. Okay. But it could be part of this plan, Right? 954 01:57:13,990 --> 01:57:13,990 I mean, it could be this. Right? Well, I believe someone would have to buy it and then Someone would have. 955 01:57:20,660 --> 01:57:20,660 or we could build it. We could build it as a as a municipality. 956 01:57:25,460 --> 01:57:25,460 we're building over there. I mean, it is it's it's in our. 957 01:57:29,620 --> 01:57:29,620 we could do it. Okay. It costs money and we'd have to look at the finances, But that is certainly part of it. 958 01:57:34,580 --> 01:57:34,580 and we could maybe hit maybe we could do 260 units there or something. 959 01:57:39,740 --> 01:57:39,740 so as opposed to opening that. So I don't know why that property isn't part of this. 960 01:57:44,540 --> 01:57:44,540 so so so I. Right. So I, I know something will happen at can view. 961 01:57:50,180 --> 01:57:50,180 but I think as a township we should help decide even if we're like I'm sorry that you Can't sell this to get this off your corporate books. 962 01:57:58,340 --> 01:57:58,340 not our problem. Right. We should be. Let them pay the taxes until we as a township decide What works best for them. 963 01:58:04,860 --> 01:58:04,860 and not just deborah, I understand. I'm not sure we can determine who they sell to or not. 964 01:58:12,100 --> 01:58:12,100 no, but we don't have to change the zoning. You say, Hey, buy it the way it is. 965 01:58:16,210 --> 01:58:16,210 I actually have a question for you. This hearing is about our state numbers. 966 01:58:24,090 --> 01:58:24,090 no, it's not about the state numbers. Those were. I'm sorry. This is about approving. This Is about approving our plan. 967 01:58:29,610 --> 01:58:29,610 right. So for. So it's not about the can view property per se. 968 01:58:34,330 --> 01:58:37,210 well it is in terms of how we come up with our numbers too. In terms of the can be property. We're given this massive property and a massive pass. 969 01:58:41,970 --> 01:58:41,970 they're hardly putting in any units that are actually affordable, And they're just putting in a lot of properties. 970 01:58:47,010 --> 01:58:47,010 I think it's a well, they're also putting in funds in order for us to extend. 971 01:58:55,570 --> 01:58:55,570 well, frankly, I would think if we wanted to change the zoning for them from something That isn't there saying they can't sell it. 972 01:59:01,850 --> 01:59:04,450 well, if you want to change, we want to change the zoning. You know what? I think we're in a better driver's seat than just, Say, put a little bit of money into something else. 973 01:59:10,170 --> 01:59:10,170 I think that the numbers that we've come up with on that property should be hugely should Be changed. 974 01:59:16,330 --> 01:59:16,330 but I want to talk to about 23 orchard, if I may because. 975 01:59:20,650 --> 01:59:24,130 is there a question. There is a question about that one. Okay. So 23 I'm sorry, 23 orchard is in the sewer service area, Correct? 976 01:59:31,810 --> 01:59:31,810 yes. Okay, great. Thank you. It's commercial right now. 977 01:59:37,010 --> 01:59:37,010 and I know the owners. It was bought at bankruptcy, And they're now they've just done a they've come back to the taxes and they've moved it 978 01:59:45,970 --> 01:59:49,210 down to half of what they paid last year in taxes. How much do they currently pay in taxes? I don't have that off the top of my head. 979 01:59:54,570 --> 01:59:54,570 can we get it for last for 2024 and 2025? Because they did come to come back to get it Reassessed. 980 02:00:02,170 --> 02:00:02,170 because my point is these this developer has come in and bought a commercial property at Bankruptcy and is now actually doing a very good job of filling that property and 981 02:00:12,120 --> 02:00:14,600 now saying, hey, I got to make it work for myself. So I want to put in a huge amount of units of residential units. 982 02:00:19,400 --> 02:00:19,400 if that's indeed the case, then we as a township should sure as heck demand more than 20%. 983 02:00:25,920 --> 02:00:25,920 right? You're changing the zoning, right? If you want a zoning change, Then 20% is nothing. 984 02:00:33,280 --> 02:00:33,280 and we should be saying why not put all put 40% in there? 985 02:00:37,360 --> 02:00:39,880 right. If you can make a go of it, great. If you can't, Oh well. But we shouldn't be settling for 2,020% 20. Right. 986 02:00:43,320 --> 02:00:43,320 it's 20. Is it 20%. Is that the units. So how many was it for? 987 02:00:48,640 --> 02:00:48,640 23. Orchard 180 total with 36 affordable. So affordable units 36 would be it. 988 02:00:56,160 --> 02:00:56,160 so if we're if they're wanting to basically really develop this thing, I think 20% is not enough. 989 02:01:02,160 --> 02:01:02,160 so would you consider changing it to say 40%? 990 02:01:08,240 --> 02:01:08,240 I could say that as a practical matter. Project projects like that without subsidies from A municipality or from tax credit financing are 991 02:01:18,120 --> 02:01:18,120 infeasible at that set aside. But we don't really even need it to be developed. 992 02:01:22,840 --> 02:01:22,840 right? So why does it why would we giving it away in essence, For free? 993 02:01:27,920 --> 02:01:27,920 like we should be getting something more that I would hope that the that the planning Board would really consider that either now or in the future when it comes to that. 994 02:01:37,200 --> 02:01:37,200 so and then if just as just a note to people in the audience, If you want to get more information on collecting names afterwards and contact information 995 02:01:45,880 --> 02:01:45,880 will keep people apprized. Thank you. Craig craig johnson, City 996 02:01:55,640 --> 02:01:55,640 manager. Rom. Rom a sorry. Rom. 997 02:02:06,160 --> 02:02:06,160 nope. Claude takano and paul vecchione. 998 02:02:15,870 --> 02:02:15,870 kristen paul is coming. Hello. Paul vecchio and six mathew storm road. 999 02:02:24,670 --> 02:02:28,390 sir, do you swear or affirm your testimony this evening will be truthful. I do. Thank you. Just a question in regards. I know the state's going to force pretty much Everything on us here. 1000 02:02:35,950 --> 02:02:35,950 after the adoption. I'm assuming the adoption of some plan. 1001 02:02:40,470 --> 02:02:44,310 if. What? What's that time frame look like after that? As far as what we have to do in the in the various steps have to be taken. 1002 02:02:47,590 --> 02:02:47,590 kind of. What's that general. So, so the the the housing plan element is required to be Adopted and filed by june 30th. 1003 02:02:55,670 --> 02:02:55,670 okay. After that, there are a series of implementing ordinances that would have to be Adopted. 1004 02:03:01,430 --> 02:03:01,430 and we have until march 15th of 2026 to adopt those ordinances. 1005 02:03:07,020 --> 02:03:07,020 all right. Would that be where the variances take place? No no, No. The variance happens at a at a hearing, 1006 02:03:12,740 --> 02:03:12,740 either a planning board or a zoning board application where there's a deviation from the Standard. What would happen in that step, that first part then between now and march 26th. 1007 02:03:20,860 --> 02:03:24,500 march 15th of 2020 2022. What would happen in there? They're the ordinances that are required to create the zoning opportunities, The ordinances, 1008 02:03:31,300 --> 02:03:31,300 the updated ordinances for the municipal fee ordinances. 1009 02:03:35,340 --> 02:03:35,340 those will all be updated and to comply with the new fair housing act and to be able to Implement the plans that are talked about in here in terms of the 1010 02:03:44,860 --> 02:03:44,860 inclusionary development. So any other agreements that have to be made. 1011 02:03:49,580 --> 02:03:49,580 okay. So at that point, I guess there's still 27 municipalities challenging that are suing The state of new jersey. 1012 02:03:56,180 --> 02:03:59,580 I know they've all adopted plans up to this point. Would we consider as a town or the planning board joining those 27? 1013 02:04:02,980 --> 02:04:02,980 because my understanding is they're opposing the formula. And then any other changes have To happen at the legislative level in between now and then, 1014 02:04:10,900 --> 02:04:10,900 we have an election coming up at the state level, Which could potentially change this. I think we should reach out as a group if we haven't 1015 02:04:17,060 --> 02:04:19,700 reached out to our state legislators already. As to our opposition to the formula, we should do that right away. 1016 02:04:24,020 --> 02:04:24,020 but then consider joining the other 27 municipalities, You know, against this fight about the formula, 1017 02:04:30,500 --> 02:04:34,380 and then let the legislative area kind of play itself out in that regard. Can I ask a clarifying question based on what you just said to our planner, The 27 towns that have filed a lawsuit? 1018 02:04:41,820 --> 02:04:44,220 I have one of them was that I have one of them. You have one. One of them. Okay. Did they did they ever pass a resolution as a township to To agree to the 1019 02:04:53,940 --> 02:04:53,940 number, or did they follow the lawsuit before that time? 1020 02:04:58,340 --> 02:04:58,340 I guess have have have we already missed the opportunity to do that or could we? 1021 02:05:03,130 --> 02:05:03,130 as as the commentator says or the questioner says, Join a. 1022 02:05:07,730 --> 02:05:07,730 I think they would always love to have more riders on the bus for that, Right? 1023 02:05:11,970 --> 02:05:15,690 I guess I'm asking your perspective as a as a planner. Not not in your opinion. Not illegal. Not legal stuff. 1024 02:05:18,770 --> 02:05:18,770 not not not as a yes. Yes. Based on your knowledge of the affordable housing act that was Passed. 1025 02:05:27,810 --> 02:05:27,810 like, warren township's still part of it. You know, Our neighbors to the north. No, I, I. 1026 02:05:32,250 --> 02:05:32,250 well, let me let me pull back a second and say this, That in all of the towns where we've passed resolutions, 1027 02:05:38,610 --> 02:05:38,610 adopted a plan, those resolutions include a caveat in there that if this litigation ends Up changing what has happened in here, 1028 02:05:48,010 --> 02:05:48,010 the assumptions that this is based on, or there's a change to the fair housing act that Changes things, 1029 02:05:54,210 --> 02:05:54,210 we reserve the right to go back and change that plan to reflect that so that that will be In there. 1030 02:06:01,080 --> 02:06:01,080 that's all I know is a plan. So I guess. But my question is, Did they comply with their requirement to and then file the lawsuit? 1031 02:06:09,240 --> 02:06:12,560 yeah, they adopted a plan. They did adopt the they adopted all 27. Adopted a plan. So so what's happened? Avoid the builder. 1032 02:06:16,720 --> 02:06:19,480 this is my expert. So I just want to make sure from my expert that. Yeah. But I think your point is very valid. And it's a good question. Yeah. 1033 02:06:22,800 --> 02:06:26,800 yeah. Yeah. Yes. Please. Please, please. I don't want to interrupt. Yeah. The the towns that I work with and the ones I'm familiar with, They all stipulated to a number, 1034 02:06:32,680 --> 02:06:32,680 and they figured we're going to do this, and we'll figure it out later. Maybe we'll file a Plan, maybe we won't. 1035 02:06:37,360 --> 02:06:41,200 and then going down the road, they decided we're going to file. And they file the plans with that caveat in there. 1036 02:06:43,400 --> 02:06:43,400 they still have that caveat on there that if things change because of litigation, Right. 1037 02:06:47,680 --> 02:06:47,680 they want that out to be able to revise their plan without fear of having builders come in And say, 1038 02:06:52,920 --> 02:06:52,920 no, you're changing your plan. You can't do that. So if we did adopt our plan, It would have those caveats as well. 1039 02:07:00,360 --> 02:07:00,360 that's what I suggest that the resolution and I think she has that too. 1040 02:07:05,160 --> 02:07:05,160 what's what's the downside of joining that litigation with those groups? Money. 1041 02:07:09,840 --> 02:07:09,840 we don't know what that amendment is. Yeah. Well that's also not a decision for the Planning board. 1042 02:07:14,440 --> 02:07:14,440 that would be the township committee. I mean, This whole plan is going to cost us money. So it's a matter of how much? 1043 02:07:20,760 --> 02:07:24,680 how what what's the process if you do have to pivot properly? Properties like if that. I want to talk about the kennedy property. 1044 02:07:27,680 --> 02:07:30,760 let's just say for instance variances are in passed. And I think someone brought up the state property that's restricted land, The orchard and or by the church or the right. 1045 02:07:38,800 --> 02:07:40,960 right. And that what does that mean? Restricted. The state would not allow us to buy that from them, Or a developer to buy it from them for this type of a project. 1046 02:07:47,240 --> 02:07:47,240 well, close to the school, walk to school, all that township is currently working with the State to acquire the property, 1047 02:07:53,960 --> 02:07:53,960 but it has a restriction on it, so we couldn't put it in the plan right now. 1048 02:07:58,150 --> 02:07:58,150 one, we don't control it and two, there is restrictions. So there would have to be a Process we would go through to lift those restrictions. 1049 02:08:05,830 --> 02:08:05,830 so that is probably a two year process. And it's a farmland restriction right. 1050 02:08:12,310 --> 02:08:12,310 it has to be used for farmland. I'm sorry. Say it again. 1051 02:08:16,470 --> 02:08:20,270 farmland restricted to farmland. That's preserved farmland. Right, right. And just to your other question, If I just I just ran some numbers quickly here to replace ken view as a site in here. 1052 02:08:28,190 --> 02:08:28,190 let's say you want to say there was a sea change in the township's view of this and Whatever. 1053 02:08:34,430 --> 02:08:34,430 to replace ken view, you would need a site or sites capable of producing over 700 market 700 total units. 1054 02:08:44,390 --> 02:08:46,670 how does that number get? So let me explain this. So if you assume that you you had to change ken view. 1055 02:08:50,150 --> 02:08:50,150 and ken view is a unique property because we're doing on site inclusionary plus the Extension of controls and there's bonuses attached to that. 1056 02:08:57,030 --> 02:08:57,030 we get redevelopment bonuses, we get extensions now, We don't get the extension. 1057 02:09:01,430 --> 02:09:04,710 we get the redevelopment bonuses. You take all that away. If you were just going to replace it with family rentals, It just zone a spot without any concept plan. 1058 02:09:09,910 --> 02:09:09,910 you just said this is a field that's in the sewer service. Er we're going to do that. To Replace it you would need 706 units because you would only 20% for 15% set aside on that 1059 02:09:19,750 --> 02:09:19,750 straight zone, because they're set aside because the set aside 15% set aside. So that Translates to 700 units. 1060 02:09:24,470 --> 02:09:24,470 it's the freelander given that's given. So I wanted to make sure because you were talking About replacing can view the implications of that. 1061 02:09:31,470 --> 02:09:35,030 or how many sites or what size site would you need for that. And this plan tried to accommodate, economize on the land and new units to try to maximize The bonuses in the production there. 1062 02:09:42,830 --> 02:09:42,830 so that just gives you a sense of and it's not easy to find a site where you could or two Sites where you could do 350 units each. 1063 02:09:50,230 --> 02:09:52,590 it's not an easy job. How big is that site? I'm sorry. Total acreage can view is the developable part. 1064 02:09:58,020 --> 02:09:58,020 it's 160. Two. My plan is to big. 1065 02:10:08,780 --> 02:10:11,700 while they're looking. Any other questions? That's good. Okay. Thank you. Thank you. And as soon as they have it, They'll they'll yell it out. 1066 02:10:20,980 --> 02:10:20,980 thank you. Hey, sherry. Could you see who's next on the list while there? 1067 02:10:27,980 --> 02:10:27,980 I'm sorry. I'm sorry. Christina. Christina. Thank you. 1068 02:10:35,180 --> 02:10:35,180 yes. Okay. Hello, everyone. I'm christina. Fire, 32 east ridge road. 1069 02:10:42,180 --> 02:10:46,060 ma'am, do you swear or affirm any testimony you give will be truthful. Yes. Thank you. So I only learned about this meeting an hour ago. 1070 02:10:55,210 --> 02:10:55,210 but it seems, or most of us are trying to do the right thing for this township. 1071 02:11:01,690 --> 02:11:01,690 one question. When did this, however many page document come out with all the can you Stuff on it? 1072 02:11:10,770 --> 02:11:10,770 like when was it made available on the website? 1073 02:11:15,450 --> 02:11:15,450 june 13th. Was there any news of this like site plan and everything about can view prior To june 13th? 1074 02:11:27,610 --> 02:11:27,610 we did the information session in january where we talked about the overall numbers. 1075 02:11:31,850 --> 02:11:35,170 we did not specifically talk about can view at that time. Okay. How many people in this room are here? Mostly about the can view site. 1076 02:11:41,850 --> 02:11:41,850 okay. So I guess ten days would have been better than one hour to prepare for this. 1077 02:11:49,330 --> 02:11:49,330 but as being an optimist, I don't think we can stop. 1078 02:11:57,450 --> 02:12:01,010 my question is, has anyone to multiple questions? Has anyone looked at the impact of 417 housing units in the environmentally sensitive Area? 1079 02:12:09,090 --> 02:12:09,090 ken view is at the foot of the southland preserves, Which is the largest contiguous green space, 1080 02:12:16,570 --> 02:12:16,570 to my knowledge, between new york and philadelphia. 1081 02:12:25,530 --> 02:12:25,530 okay. One of the things I would add is that the township has bought a significant amount Of land up on the mountain to preserve that contiguous tree 1082 02:12:35,450 --> 02:12:35,450 canopy that you're referring to at a significant investment, And remains committed to it to this day. 1083 02:12:42,170 --> 02:12:42,170 so true. And that's. Yes. And I we moved to this township because of this township's Commitment to the environment, 1084 02:12:51,560 --> 02:12:51,560 to the open space and nature. So wooden and I know 700 is a lot more than 417. 1085 02:13:01,200 --> 02:13:01,200 but could we do everything in our power to leave that environmentally sensitive area with Wetlands that 1086 02:13:11,200 --> 02:13:11,200 is here, which would a lot of it been taken away by the proposed developer and find some Other 1087 02:13:20,640 --> 02:13:20,640 area which is more near transportation, which is already more developed and away from this Area. 1088 02:13:30,160 --> 02:13:30,160 I think it behooves us to do that. Okay. And if we don't 1089 02:13:40,000 --> 02:13:40,000 do that and the zoning comes up, and what what if we all get together and say, No, we don't want this zoning to change. 1090 02:13:51,440 --> 02:13:51,440 then we have this in the plan. Does that put us at risk for litigation since we already Have it in the plan? 1091 02:13:59,120 --> 02:13:59,120 well earlier we talked about how the contract purchaser has a plan to develop what they Call buy. 1092 02:14:06,360 --> 02:14:06,360 right? So under the current zoning. So I don't know if you were here for that part of the Discussion that we were having because so something's going to change that can be right 1093 02:14:15,520 --> 02:14:15,520 that that we understand. Right. But taking and looking at the environmental and traffic And all sorts of impact of a 417 unit 1094 02:14:25,400 --> 02:14:25,400 housing complex versus a research complex versus light manufacturing. 1095 02:14:32,960 --> 02:14:32,960 the trucks that you were talking about. Can I ask what the definition of a truck is? 1096 02:14:37,680 --> 02:14:37,680 is it an 18 wheeler? Is it it the big dump trucks that go down, Up and down 601 from the mine. 1097 02:14:43,720 --> 02:14:43,720 is it an amazon delivery truck? Right. It it could be a box truck. 1098 02:14:49,630 --> 02:14:51,990 it. What happened to you? It could be a box truck. It could be a tractor trailer. It could run the gamut depending on the user of. 1099 02:14:57,430 --> 02:14:57,430 they were doing flex space. So there would be units where someone might be creating one Thing, 1100 02:15:04,750 --> 02:15:04,750 and they do need a small box trucks to come and bring various parts that they assemble. 1101 02:15:11,110 --> 02:15:11,110 and then maybe once they're all assembled, a large tractor trailer takes it off of the Site. 1102 02:15:16,310 --> 02:15:16,310 so it really they, the traffic engineer kind of uses an average number, So it could be less. 1103 02:15:24,910 --> 02:15:27,830 it probably it could be worse, depending on the actual users. And we can't zone the users and users that go into that building so they could change. 1104 02:15:35,190 --> 02:15:35,190 so that so the answer is it could be it could be anything. 1105 02:15:39,870 --> 02:15:39,870 it could be anything. Okay. But as barbara pointed out, Looking at the traffic from 417 housing units should be compared to that 1106 02:15:49,060 --> 02:15:49,060 420. So I don't think we've done a good comparison for all the different possibilities of This can view property, 1107 02:15:59,260 --> 02:15:59,260 right? So if and I it sounds like we have a week to do this. 1108 02:16:06,220 --> 02:16:06,220 it's the 23rd. And by the 30th we need to approve this part plan. 1109 02:16:10,260 --> 02:16:10,260 realistically we have a couple of years to get any developments approved. 1110 02:16:18,940 --> 02:16:18,940 okay. Tonight is about approving a plan for affordable housing because I think most of us In this room 1111 02:16:28,420 --> 02:16:28,420 understand that. And I'm sorry if I'm speaking out of line that there will be some change, 1112 02:16:34,180 --> 02:16:34,180 but I feel probably that most of us in this room are against the housing unit parked in a Rural area. 1113 02:16:42,900 --> 02:16:42,900 if you go between 200 and 6 down to 518. It is rural all the way. 1114 02:16:49,180 --> 02:16:52,300 it is one of the most beautiful parts of montgomery. People even living in montgomery sometimes don't know that area back there. 1115 02:16:57,540 --> 02:16:57,540 so I'm going to go off book here, I apologize. 1116 02:17:02,340 --> 02:17:02,340 and michael said it earlier. Let's say that I think we probably all agree that this kind Of stinks. 1117 02:17:13,540 --> 02:17:13,540 the alternative is, though, that a developer, Maybe not the ones buying, can view today. 1118 02:17:21,420 --> 02:17:21,420 but a year from now, if we do not have a program or a plan, Approved developer could come in and say they want to build 1119 02:17:31,020 --> 02:17:31,020 1500 houses and that that would not come to this board. 1120 02:17:36,140 --> 02:17:36,140 that would not go to the township committee. It would go to a judge and they would decide. 1121 02:17:43,130 --> 02:17:46,130 yes. And I now understand that having sat through this meeting. So I appreciate that. So we're basically between a rock and a hard place, And we have to make the best of what we 1122 02:17:55,690 --> 02:17:55,690 have. And usually the best solution is when everybody's unhappy. 1123 02:18:04,410 --> 02:18:04,410 okay. The last, I guess, question, question. How many of you will 1124 02:18:14,250 --> 02:18:14,250 be more attentive to what's going on in this township and looking at the websites more Frequently and looking at every single 1125 02:18:24,170 --> 02:18:27,570 piece of paper? That's that's a question for for everybody. Not not here. Until an hour ago I was not that we support that. 1126 02:18:32,810 --> 02:18:32,810 so all right. We will solve this. Thank you. Thank you so much. 1127 02:18:38,930 --> 02:18:38,930 stephen. Voorhees. Stephen. I'm sorry. Stephen. 1128 02:18:48,330 --> 02:18:48,330 lauren. Paul. I'm sorry. Paul. I gotta put paul s paul. 1129 02:18:53,370 --> 02:18:53,370 s paul. Let's do this. Hi. My name is paul shaw. 1130 02:19:00,610 --> 02:19:00,610 I live in skillman. Sir, do you swear or affirm any testimony you give will be truthful. 1131 02:19:05,770 --> 02:19:05,770 yes, I do. Thank you. So, actually, I just want to just piggyback a little bit on what Christina was just talking about and just ask about timeline, 1132 02:19:14,090 --> 02:19:14,090 because, again, for me, it was found out about this an hour ago. 1133 02:19:18,210 --> 02:19:18,210 so at the very beginning, you talked about milestones for, For, like, how we got to where we are here and where we are here. 1134 02:19:24,890 --> 02:19:24,890 we have an 800 page report that was provided for general consumption ten days ago. 1135 02:19:31,050 --> 02:19:31,050 presumably the planning committee has taken those ten days and poured exhaustively over Those 800 pages over ten days. 1136 02:19:39,800 --> 02:19:39,800 I just want to sort of walk backwards. So the milestone you had before that was in late March. 1137 02:19:46,400 --> 02:19:46,400 what happened in late march? The court issued an order approving the number of affordable Housing. 1138 02:19:53,320 --> 02:19:53,320 okay, but it wasn't a meeting of any sort that had any input from. 1139 02:19:57,720 --> 02:20:01,560 no, it was it was a it was a an order from the court. It was an order from the court. Okay. And that's when the town understood that its number Was locked in. 1140 02:20:05,960 --> 02:20:05,960 okay. And so a court ordered, okay, lock in this number late march. 1141 02:20:10,800 --> 02:20:14,760 and then prior to that, we're talking a handful of january dates. Was it? Well, in january, there was a public information meeting about what we're facing In terms of this mandate from the state and how we're going to, 1142 02:20:22,600 --> 02:20:25,800 you know, that we need to solve it. It talked about the need. By the end of january that the township had to stipulate to a number, And they did that by resolution. 1143 02:20:31,320 --> 02:20:31,320 and the resolution also said it would participate in the program. 1144 02:20:35,350 --> 02:20:35,350 we waited for the the court to solidify that through their order, But. 1145 02:20:41,630 --> 02:20:45,390 and then the next deadline is june 30th. Okay, Great. So correct me if I'm wrong, then. So to summarize in in january. 1146 02:20:50,550 --> 02:20:53,190 like the number was sort of discussed and decided. And then in march a court said like okay, lock in this number. 1147 02:20:58,430 --> 02:20:58,430 and then on june 13th we're provided an 800 page document for a june 23rd the 1148 02:21:08,150 --> 02:21:11,910 meeting in order to approve it by june 30th. That's correct. That's correct. Okay. And this was this was like, Is there something in the process that I'm not understanding that like, 1149 02:21:20,950 --> 02:21:20,950 that was like that this could have been done in a sort of more collaborative kind of way Or I don't know. 1150 02:21:30,150 --> 02:21:30,150 I think the timeline that you discussed is set by the state, Which is why michael probably hasn't slept. 1151 02:21:37,630 --> 02:21:40,390 you know, working on these 800 pages is hard to do. Yeah. So we understand where you're coming from, And the timelines are really not reasonable. 1152 02:21:48,550 --> 02:21:48,550 yeah. And to give you an idea, the third round plan probably took a year or more to do it Because we didn't have the gun to our head. 1153 02:21:56,110 --> 02:21:56,110 can can. Can I ask you a clarifying question then, Miss aaron, if you just said as a testimony that the timeline is not reasonable, 1154 02:22:04,550 --> 02:22:04,550 can then we. Is it possible that the township committee could file a lawsuit stating just That, 1155 02:22:10,510 --> 02:22:13,110 and we don't have to make a decision by june 30th? Is that is that a reasonable thing to do? You just. 1156 02:22:16,270 --> 02:22:16,270 I. Think so. There are towns that have asked for 1157 02:22:25,870 --> 02:22:25,870 extensions who have brutal circumstances in terms of, You know, whatever's going on and there hasn't been any success. 1158 02:22:34,060 --> 02:22:34,060 you have to fight with the court. You have to file a motion to extend the time period and The time frames that have been mentioned have been like 1159 02:22:43,900 --> 02:22:43,900 90 days, 60 days, things like that. I can't speak personally. 1160 02:22:48,780 --> 02:22:48,780 I know one's pending and it's june 30th, so you're going to have we're going to have no Way to know. 1161 02:22:54,900 --> 02:22:54,900 but the attorneys that I've worked with have said they've had very limited success with Any kind of extension. 1162 02:23:00,060 --> 02:23:00,060 it would have to be a circumstance that was truly extraordinary from what I'm hearing. 1163 02:23:05,580 --> 02:23:09,460 but it doesn't mean that you couldn't file. Okay. All right. Thank you. Thank you. Okay. Just a just a just a quick time check. 1164 02:23:16,900 --> 02:23:16,900 it's 724, and the meeting will go to eight. And we will have to continue it to thursday Night to make sure everybody gets heard. 1165 02:23:26,820 --> 02:23:26,820 so, I'm sorry. I'm sorry. What? Fire! Fire! 1166 02:23:37,850 --> 02:23:37,850 oh, lauren. Long. 1167 02:23:48,570 --> 02:23:48,570 lauren. Long. Grandview 322 grandview road. And, Sir, do you swear or affirm any testimony you give will be truthful. 1168 02:23:56,330 --> 02:23:56,330 yes, I do. Thank you. So, it's been very interesting to listen to this. 1169 02:24:01,010 --> 02:24:01,010 my understanding is that we have to commit to some lockdown numbers, Like by the end of this month. 1170 02:24:09,170 --> 02:24:12,570 and those locked in numbers include, like, for instance, The 400. And so how housing units from can view. Is that correct. 1171 02:24:19,010 --> 02:24:19,010 can view does contain in the plan 417 total units on site. 1172 02:24:24,650 --> 02:24:24,650 so if if something happens and they can't do the can view, Be it. 1173 02:24:28,810 --> 02:24:28,810 they don't get zoning permissions or they run out of money or something like that. 1174 02:24:33,130 --> 02:24:33,130 do we still have the obligation to find some other similar set of housing units that will Meet the requirements? 1175 02:24:40,730 --> 02:24:40,730 yes. So I mean, for instance, if ken view had some other brilliant use on the property or Something. 1176 02:24:45,850 --> 02:24:45,850 yeah, I just put it on the record that if you wanted to replace ken view with just a Straight zoning of 15% set aside, 1177 02:24:53,450 --> 02:24:57,330 you'd require a site that could accommodate 706 units. Wow. Okay. Anyway the only other question to have is we talked about 400 and some odd Trucks. 1178 02:25:04,250 --> 02:25:04,250 if we had used a light manufacturing at ken view. 1179 02:25:10,450 --> 02:25:10,450 what was the number of trucks that johnson and johnson had on the road during the same, You know, 1180 02:25:16,010 --> 02:25:16,010 during their peak? I don't have that number, But it must have been. 1181 02:25:22,970 --> 02:25:22,970 okay. So I guess the only other thing is, do we have. 1182 02:25:29,520 --> 02:25:29,520 you said you had an estimate of the number of cars that we put on for the new population, If we did, 1183 02:25:35,360 --> 02:25:35,360 with the 400 and some houses or you have that somewhere number that they gave us was based On their original of 617 units, 1184 02:25:45,320 --> 02:25:45,320 and the number of cars would have been 4065 for 24 hour period. 1185 02:25:51,320 --> 02:25:51,320 is that per hour? I mean, per day? Yes. Okay. 1186 02:25:57,880 --> 02:25:57,880 I'm sorry. Sherry, when you say 4000 odd, are you talking about trips or. 1187 02:26:06,360 --> 02:26:06,360 yes, trips a day. A day? Because the people in the back of ontario. 1188 02:26:12,240 --> 02:26:12,240 yes. Thank you. According to the traffic summary sheet that the developer gave us at 617 17 1189 02:26:22,120 --> 02:26:22,120 total units. The total number of trips in a 24 hour period was 4065. 1190 02:26:29,480 --> 02:26:29,480 at full buildout for the cam view site as the light industrial, It was 7820 for car 1191 02:26:39,480 --> 02:26:39,480 trips and 402 truck trips. Wow. 1192 02:26:50,720 --> 02:26:50,720 I have no other questions. Okay. Maria. Coachman. 1193 02:27:00,880 --> 02:27:00,880 hi. Maria councilman, 139 fairview road. Ma'am, Do you swear or affirm any testimony you give will be truthful. 1194 02:27:07,800 --> 02:27:07,800 yep. Thank you. First. Thank you. I know a lot of you are volunteers, And I appreciate it, 1195 02:27:13,640 --> 02:27:16,800 because that would be. That would be all. All of us. And and I'm going to add more grief. I'm sorry. 1196 02:27:21,110 --> 02:27:21,110 who determined the lot sizes can view since I'm in that neighborhood because my Neighborhood is mountain rural. 1197 02:27:30,710 --> 02:27:30,710 we have ten acre zoning, and you want to put something with lots marked and feet right Next door to our area. 1198 02:27:40,270 --> 02:27:40,270 I actually counted within a mile of the driveway of grandview circular. 1199 02:27:46,870 --> 02:27:46,870 there's like 300 houses, and you want to put 400 on 160 acres. 1200 02:27:52,830 --> 02:27:52,830 can you justify how they came up with these tiny things? 1201 02:27:57,710 --> 02:27:57,710 lots. So we had alluded to a higher number that they came up with in terms of a site Suitability. 1202 02:28:05,630 --> 02:28:05,630 so the township was not agreeing to 600 plus units. 1203 02:28:12,470 --> 02:28:12,470 and so the total number of units is backed into from what is needed on the property. 1204 02:28:17,630 --> 02:28:17,630 so it's a mix of single family townhomes and so we should be grateful it's not 600. 1205 02:28:25,300 --> 02:28:29,300 and we're getting 400. I did not say that I was just. You asked how we arrived at the total lot number. 1206 02:28:32,460 --> 02:28:32,460 another question. Another question. Your calculation of the 600 something houses that Would needed to be replaced can view does that. 1207 02:28:42,100 --> 02:28:42,100 the view developer is proposing to give money for the buybacks. 1208 02:28:46,900 --> 02:28:50,380 and without that buyback money you would need more housing. Is that your cash? It's threefold actually. It's it's the extension of controls that are Off site. 1209 02:28:55,700 --> 02:28:55,700 so we would have to load them back in. It's the law requires a 15% set aside. 1210 02:29:02,660 --> 02:29:02,660 so that means that there's more more market rate units to get to the number that we would Need to make up. 1211 02:29:08,140 --> 02:29:12,100 and we're at what set aside with both the on site and off site. We're at 26. So that's that differential. And isn't there? 1212 02:29:17,340 --> 02:29:20,380 there was a third. Not to cut you short, but I get it. I'm trying to speed it up. In addition to that question, You are putting in 20. 1213 02:29:27,820 --> 02:29:27,820 I don't know, it's 22 extensions and 24 surplus as extra stuff. 1214 02:29:34,820 --> 02:29:34,820 that's 46 units. You're putting 70. That's more than half of what's happening at at ken View. 1215 02:29:43,220 --> 02:29:46,860 and I do understand the ken view has to be developed. I get that we always knew that. We've lived there 33 years. 1216 02:29:51,140 --> 02:29:51,140 but I don't understand the desire, the desire to change the entire character of art. 1217 02:29:58,700 --> 02:29:58,700 we chose to live there because of the open vistas, Because of the large housing lots and going to 1218 02:30:08,020 --> 02:30:08,020 change. Change the nature of that part of town. 1219 02:30:13,580 --> 02:30:13,580 and my belief is that just going to be the start of the creep that happened on the other Side of 206, 1220 02:30:20,210 --> 02:30:20,210 which is why I would not live there. It's just not my choice of where I want to live. 1221 02:30:24,610 --> 02:30:24,610 it's fine for a lot of people, but I chose to live in an area that was rural, And you want to go against that fairly severely 1222 02:30:35,170 --> 02:30:35,170 and change that dynamic. I understand some of it does have to do with the sewer service Area. 1223 02:30:40,250 --> 02:30:40,250 and so the town has tried to reduce where development can be through limiting the sewer Service area limits. 1224 02:30:49,810 --> 02:30:49,810 so all about poop. It's all about poop. I get it, I and I understand that and I understand that we are in an 1225 02:30:59,690 --> 02:30:59,690 area that's heavily, you know, it's all septic and wells which goes to another issue That's for down the road of if 1226 02:31:09,450 --> 02:31:09,450 there's going to affect our aquifer, etc., etc.. 1227 02:31:15,490 --> 02:31:15,490 sorry. Your comment about the tax revenue is higher from residential than from what jay aa Or 1228 02:31:25,290 --> 02:31:25,290 can view currently. But in my 33 years of living here, The township school district has gone from 1500 students to 1229 02:31:35,170 --> 02:31:35,170 5000 something students, which has increased my taxes over 400%. 1230 02:31:41,330 --> 02:31:41,330 and I don't see how getting a little more money for the houses will change that tax Revenue. 1231 02:31:48,930 --> 02:31:48,930 and I wish you would explain how you think that's going to benefit our town. 1232 02:31:57,210 --> 02:31:57,210 and thank you. That's all for now. Do you want to talk about how that works? 1233 02:32:05,570 --> 02:32:05,570 just before the next person comes up I just want to clarify the 22 units, The extensions that we have to purchase. 1234 02:32:11,680 --> 02:32:11,680 in the fourth round, we cannot use in the fourth round because we have a senior cap. 1235 02:32:16,960 --> 02:32:20,520 so we those will be banked for a future round, Right? We're limited to those. Yes. In this there are 24 surplus units which gives us that Flexibility. 1236 02:32:28,120 --> 02:32:31,120 should we have a little slide in any of our other areas. Right. We have a quick question. Do we have any recourse? 1237 02:32:34,280 --> 02:32:34,280 I heard it mentioned before that pike run decided they didn't want to be involved in the Equation or the extension of 1238 02:32:43,640 --> 02:32:43,640 controls. Do we have any recourse for properties like that, Or is it just. 1239 02:32:50,680 --> 02:32:50,680 yeah, I don't want to be involved. Leave me alone. Or is there anything that we can do in The event that and then this is just hypothetical, 1240 02:32:56,640 --> 02:32:56,640 that the can of you site doesn't, you know, go through it goes before the board and we, We make a decision that, 1241 02:33:04,400 --> 02:33:04,400 you know, it's not going to happen in terms of the zoning. And we need the, The affordable credits. 1242 02:33:11,670 --> 02:33:11,670 is there any way that we could sort of discuss that with other properties? 1243 02:33:15,710 --> 02:33:19,390 I just thought about that when I heard about the bike run thing. Other properties? Yes. But the the extension of controls at pike run is governed by a Series of documents that are legal documents and 1244 02:33:29,350 --> 02:33:29,350 recorded documents, and they don't give us the the right to sue essentially over that Extension. 1245 02:33:37,030 --> 02:33:37,030 okay. Jake schwartzman. How's it going? Jake schwartzman 1246 02:33:47,190 --> 02:33:47,190 920 cherry hill road. Sir, do you swear or affirm any testimony you give this evening will Be truthful. 1247 02:33:52,990 --> 02:33:52,990 yes. Thank you. So I just want to preface by saying this is kind of my first time at a, At a at something like this. 1248 02:34:00,790 --> 02:34:04,030 I don't I don't quite know what I kind of heard about this last night. I don't even fully know what this is. I just heard about what's going to happen to the Kennedy thing. I don't know who all these people are or anything. I'm pretty new to this, 1249 02:34:11,870 --> 02:34:11,870 as I think some people here might be. But my question. 1250 02:34:19,070 --> 02:34:19,070 yes. So I, I feel like it. My question has kind of changed as I'm sitting here listening To everybody's questions, 1251 02:34:27,270 --> 02:34:27,270 and it's kind of like, it sounds like we're being almost bullied into this in that we have To like, 1252 02:34:34,430 --> 02:34:34,430 I know we have to add some sort of some sort of housing, Low income housing or something. 1253 02:34:40,590 --> 02:34:44,190 but like, why can view why do we have to redevelop it? People, people are saying we have to redevelop it. Why can't you just why can't it just be Because we have power as the town to say, 1254 02:34:51,070 --> 02:34:51,070 no, you can't rezone this. And no, like I just, I think there's so many different consequences on a larger scale, 1255 02:34:59,110 --> 02:34:59,110 which I can talk about if I won't get to the comments, But I can talk about it later. 1256 02:35:04,750 --> 02:35:04,750 but like, I think there's so many consequences and more things that this says other than Just, 1257 02:35:10,060 --> 02:35:10,060 oh, we're putting up more housing, like this is kind of a big deal and messes up the whole I just think it's a really awful idea. 1258 02:35:16,220 --> 02:35:19,140 and it's like, how is there anything we can do about this? Because it's really being made sound like we're being bullied into this or forced into This. 1259 02:35:23,620 --> 02:35:23,620 that's really what it sounds like to me. And unfortunately, That bullying started, I think, 1260 02:35:27,900 --> 02:35:27,900 somewhere around 1976, in the state. So but why does it have to be? 1261 02:35:34,700 --> 02:35:34,700 why does it have to turn into. I went to preschool actually in that in that I've lived Here my entire life. 1262 02:35:39,540 --> 02:35:39,540 monti, class of 2021 I went to preschool, the jnj preschool. 1263 02:35:43,620 --> 02:35:47,060 bright, bright horizons. That's back there. Why do we have to change it? Why? Why does it have to be all this, this housing that's going to screw up the southland Mountains, 1264 02:35:52,660 --> 02:35:52,660 which is beautiful. This whole town is beautiful. But the southland mountains. That's so Beautiful. Why do we have to put housing there? Why are we. Why does it sound like we're 1265 02:35:59,500 --> 02:35:59,500 being bullied into this? Someone purchased the property, Right? 1266 02:36:03,820 --> 02:36:03,820 right. So can you. Is selling the property, the purchase, The company buying the property has an option, 1267 02:36:11,420 --> 02:36:15,100 a concept to develop it under the current zoning. So they have the right to do that. We kind of refer to it as the bi-rite plan. 1268 02:36:20,060 --> 02:36:20,060 and that was where the truck traffic conversation was, Was abuzz about. 1269 02:36:24,340 --> 02:36:24,340 so their redevelopment could either be under the current zoning, Which we don't have legal authority to stop them from doing. 1270 02:36:31,900 --> 02:36:31,900 or an alternative. Who's in charge of the zoning that, That says they can't rezone it because that's the municipal land use law. 1271 02:36:39,260 --> 02:36:39,260 so the state says to each town, we're giving you the right to zone. 1272 02:36:44,060 --> 02:36:47,540 this is how you will. This is how these are the rules you will follow. And so the property is zoned limited manufacturing now. 1273 02:36:50,740 --> 02:36:50,740 so they have the right to to develop it and redevelop it under that current zoning. 1274 02:36:55,420 --> 02:36:58,140 so it's above the town it's state it's state level that zones. It does that. So yeah the town zoned it limited manufacturing when j and j first developed The property, 1275 02:37:04,570 --> 02:37:04,570 and it has stayed that zoning through all these years. 1276 02:37:08,810 --> 02:37:08,810 the town had hoped that they can view, and through their sale would find a buyer that Would be similar to what operation is leaving. 1277 02:37:17,770 --> 02:37:17,770 but that did not happen. The company that's buying it has two options that they've put Forth to the town. 1278 02:37:25,410 --> 02:37:25,410 we can develop it under the current zoning, which would be this flex industrial space or a Residential, 1279 02:37:33,130 --> 02:37:33,130 which would require zoning. So they can do they can do the flex industrial under the Current zoning. 1280 02:37:39,890 --> 02:37:43,890 and the housing would need to be done through a zone change. So it could be done through affordable housing. 1281 02:37:47,130 --> 02:37:47,130 it could be done. They could sue the town and say we, You know, we can't develop it as a commercial. 1282 02:37:54,610 --> 02:37:54,610 so or you let's say they, they applied to do their buy right plan and the township denied The zoning. 1283 02:38:01,040 --> 02:38:01,040 sorry. The planning board denied it. They can sue and say to the judge this is a permitted Use. 1284 02:38:08,640 --> 02:38:11,080 you have to. You know, let me let me do this. We'd likely be overturned unless there was something, You know, and then they have some right to develop it in some way. 1285 02:38:17,720 --> 02:38:17,720 so if it's not under the current zoning, it could, You know, it could be housing then. 1286 02:38:23,160 --> 02:38:23,160 so we can't zone for farmland or open space so that it could just remain, You know 1287 02:38:33,200 --> 02:38:33,200 open and I guess a decaying office building because they wouldn't at that point take it Down. 1288 02:38:39,040 --> 02:38:39,040 okay. I'm still confused. I'm not. No, no, I hear what you're saying, But I don't know how to I don't know how to argue it because I'm not I don't know I don't 1289 02:38:45,560 --> 02:38:49,040 know how to. I don't know how it all works. Any alternatives? I'm not a politician. I'm just, you know. But I just think. I think it's really important that we fight hard to To keep it how it is, 1290 02:38:54,560 --> 02:38:57,840 I don't know. That's, that's that's basically the moral of my whole thing. I think everybody here agrees with me. Okay. Lawrence, Can I. 1291 02:39:05,400 --> 02:39:07,960 can I actually, I mean, you you just raised a point, Laurie. Actually, that. That caused me to ask a question in a different way. 1292 02:39:12,480 --> 02:39:12,480 I think I've already asked it, but if if. If johnson and johnson never left. 1293 02:39:18,120 --> 02:39:18,120 if ken view never sold their property, what would be the alternative then? 1294 02:39:23,240 --> 02:39:23,240 where? What is your what would would would have been the town's plan if johnson and Johnson was still a viable property? 1295 02:39:36,240 --> 02:39:36,240 in in the past, we sometimes have had like, backup alternatives. 1296 02:39:41,760 --> 02:39:44,840 we didn't have any backup alternatives for this plan. So if this were to fall through, you would come we would come back to the planning board To amend the plan to say this particular project 1297 02:39:54,480 --> 02:39:54,480 mechanism isn't working, and we would need to come up with another idea. 1298 02:39:59,830 --> 02:39:59,830 but but the numbers would stay the same. I mean, Well, under michael's calculation, we would be looking for land that could accommodate 1299 02:40:08,710 --> 02:40:12,190 706 correct housing units. Right. That's what I mean. That's right. Yeah, but. And I don't want multiple pieces. 1300 02:40:16,750 --> 02:40:16,750 yeah, I think I would like to talk too much. Thank you. 1301 02:40:20,990 --> 02:40:20,990 hello. We are the cg from coldstream court at skillman. 1302 02:40:26,910 --> 02:40:26,910 all righty. Do you both swear or affirm any testimony you give will be truthful. 1303 02:40:31,270 --> 02:40:31,270 yes. Thank you. We do. Thank you. Voila. So I was I was at this at this meeting since the Beginning, 1304 02:40:40,790 --> 02:40:40,790 and I listened to the whole the whole meeting. 1305 02:40:45,390 --> 02:40:45,390 and I was wondering if you're going to do more work for the township or if your job is Stopping today. 1306 02:40:55,420 --> 02:40:57,580 I didn't understand the question. Both of you. I mean, have you finished your mission? And is it the summary of what you propose? 1307 02:41:04,780 --> 02:41:08,300 or are you continuing to work for the township? Yeah. So first of all, the adoption of the housing plan doesn't end the process, Right? 1308 02:41:13,500 --> 02:41:17,260 the adoption of the housing plan, we still there's still ordinances that need to be done. There's agreements that would need to be done. And over the next, You know, 4 to 8 months those things would happen. 1309 02:41:24,420 --> 02:41:24,420 that okay. But your job I would like to know you your job. 1310 02:41:29,180 --> 02:41:29,180 are you continuing to recommend something or does it stop today? 1311 02:41:33,300 --> 02:41:33,300 was it your final recommendation? What you shared with us today? 1312 02:41:38,180 --> 02:41:38,180 let me be very clear. As a as the consulting affordable housing planner, My job is to work with the town to help develop a plan that fits the rules and the law. 1313 02:41:47,900 --> 02:41:47,900 and that's what I've done. The decisions about how these sites can in here, That's. 1314 02:41:52,580 --> 02:41:56,300 I'm an adviser. I'm not a decider. Yeah. So I work with the town. Thank you. They're behest. Thank you. So I want to tell you you gave me the impression That you were 1315 02:42:06,100 --> 02:42:09,220 paid by the developer and not by the township. Because you you to you, the people you represent. 1316 02:42:14,460 --> 02:42:14,460 because all that you showed us was one planner, One choice. 1317 02:42:21,220 --> 02:42:21,220 let me finish. Let me finish. We don't have a lot of time. 1318 02:42:26,060 --> 02:42:26,060 so you you you said there is there. Is there a question? 1319 02:42:31,660 --> 02:42:31,660 because you have. Yeah, it's my question. So I haven't I mean, This is I have not finished with my question. 1320 02:42:37,540 --> 02:42:37,540 okay. So you know, we are attached to this site. 1321 02:42:44,260 --> 02:42:44,260 you were trying to hide during the whole meeting that it was owned by johnson and johnson, 1322 02:42:49,540 --> 02:42:52,770 but the deed is owned by johnson and johnson. So you are seeing can view. Can view. Can view is almost gone. 1323 02:42:56,690 --> 02:42:56,690 okay. So you said earlier that the developer said that there would be 4000 trucks. 1324 02:43:07,290 --> 02:43:07,290 so, you know, whatever the number. Yeah. So the thing is, Can you be a little more objective instead of, 1325 02:43:17,210 --> 02:43:17,210 like, saying what the developer said, can you please, Like, like have a multiple what if what did we do to have a 1326 02:43:26,890 --> 02:43:26,890 research group take over the site? What effort has been made? 1327 02:43:32,130 --> 02:43:32,130 all the what? The impression you gave us tonight is that all the efforts were made to Build additional housing. 1328 02:43:40,010 --> 02:43:40,010 that's it. This is all. This is the only solution. 1329 02:43:44,770 --> 02:43:44,770 this is not the solution. Ma'am, I have to limit you to a two question if you have if you Have comments and you want to just talk rationally, 1330 02:43:53,170 --> 02:43:56,450 that would be great. There's no reason to yell at anybody. I mean, there really isn't. Okay. Okay. 1331 02:44:07,010 --> 02:44:07,010 have you confirmed that the deed for that property is in the name of j and j right now, And not can view? 1332 02:44:16,410 --> 02:44:19,890 what? What would it matter? We are dealing with the contract purchaser. Okay. So that goes to my next question. No, I'm dealing with the contract purchaser. 1333 02:44:24,450 --> 02:44:24,450 yeah. My next question is why are you dealing with the contract purchaser if the numbers Won't change, 1334 02:44:30,370 --> 02:44:30,370 regardless of what the owner of the property is? 1335 02:44:34,850 --> 02:44:34,850 because why are we having conversations with the contract purchaser that hasn't is that That's who's going to be owning the property? 1336 02:44:41,970 --> 02:44:41,970 well, they are contract purchasers, which means that it's not a done deal yet, Right? 1337 02:44:48,280 --> 02:44:50,920 so we don't know if the deal is going to go through. So why are we dealing with them like they are going to be the owners? 1338 02:44:55,320 --> 02:44:58,280 ken view has said this is who you will be speaking with. We are no longer discussing the property. We're selling the property to this company. 1339 02:45:03,000 --> 02:45:03,000 right. But that property is only going to be purchased if they like what you decide. 1340 02:45:08,160 --> 02:45:08,160 so they you can make decisions that they're not going to like, And then the contract won't go through and then it will remain as it is. 1341 02:45:15,200 --> 02:45:15,200 so they are very interested in buying the property under the current zoning. 1342 02:45:19,440 --> 02:45:19,440 yes. They'll just they'll just, you know, that's what they that's what they have. 1343 02:45:24,240 --> 02:45:27,160 let me let me get to my next question. I hear your answer. I'm just trying to move it along. Is there an advantage to being a part of the lawsuit? 1344 02:45:34,280 --> 02:45:34,280 to the extent that the court could decide that the participants in the lawsuit get a Particular remedy, 1345 02:45:40,240 --> 02:45:40,240 that people who are not in the lawsuit won't get? 1346 02:45:47,110 --> 02:45:47,110 I mean I. Possible I mean if the if that litigation results in let's let's 1347 02:45:57,030 --> 02:45:57,030 make a proposition here. Let's say that that litigation results in a change to the fair Housing act that impacts everybody. 1348 02:46:04,430 --> 02:46:04,430 right. But it could result in changes for the obligations of individual municipalities. 1349 02:46:10,390 --> 02:46:10,390 right. They're not they're challenging the law and not not just not just for their not Just for theirs. 1350 02:46:17,790 --> 02:46:17,790 yeah. Last thing. The property of the form of municipal building. 1351 02:46:22,270 --> 02:46:22,270 could we change the zoning of that now to make it entirely low income and thereby relieve The burden from other properties to it? 1352 02:46:32,070 --> 02:46:32,070 is it is it within your authority to change the zoning for that one piece of property? 1353 02:46:37,870 --> 02:46:37,870 so that I talked a little bit about why 100% percent affordable is not the best option for The 1354 02:46:47,670 --> 02:46:47,670 town to pursue right now, including the strain on ems. 1355 02:46:52,670 --> 02:46:52,670 the cost to the taxpayers because our affordable housing. 1356 02:46:57,110 --> 02:46:57,110 what's the current zoning of the municipal building? The old municipal building. It's Zoned ppe, 1357 02:47:02,750 --> 02:47:02,750 public parks and education. Okay. So we can at least make it residential with a high Percentage. 1358 02:47:09,630 --> 02:47:09,630 now to make it easier for someone to come in and do a deal there and take some of the Credits. 1359 02:47:16,550 --> 02:47:20,350 we would have a different 50 people that are in here. Okay. All right. That would say not in my backyard either, Right. 1360 02:47:23,950 --> 02:47:23,950 okay. Diane. Got a quick one before diane gets up. 1361 02:47:32,710 --> 02:47:32,710 do do we have enough property to accommodate the number in the event that 1362 02:47:42,900 --> 02:47:42,900 can view is not approved. Are there enough lots or properties that we can engage 1363 02:47:52,700 --> 02:47:52,700 to to support the number in montgomery? So you would need to look at properties that have Public water and public sewer. 1364 02:48:02,260 --> 02:48:02,260 and and they're large enough that could support 700 and some. 1365 02:48:07,380 --> 02:48:07,380 but the other thing is there's a practical reality. 1366 02:48:14,620 --> 02:48:14,620 is there a practical reality to the scale of a project that would actually be feasible in Some places where you have very small sites, 1367 02:48:23,060 --> 02:48:23,060 you can get away with very small little developments that are inclusionary, But when you're talking about 15%, 1368 02:48:28,220 --> 02:48:28,220 you need a project that can support at least at six, Five, you know, five total units at six units per acre, 1369 02:48:34,460 --> 02:48:34,460 per the law. Okay. How many of those can you cobble together because you get one for every One of those projects. 1370 02:48:40,540 --> 02:48:43,060 so there's a scalability that's important to this. In terms of the market and understanding that, The other point I should make is that the the law really recognizes that the public, 1371 02:48:50,180 --> 02:48:50,180 the the private sector developers are largely the the entities that will create affordable Housing, 1372 02:48:56,300 --> 02:48:56,300 whether they are the 100% affordable developer or the 15%, You know, pulte or whatever they are. 1373 02:49:04,220 --> 02:49:07,900 it's the private sector that does most of this, And the implementation is really there. So they call the tune in terms of whether it's feasible or not. 1374 02:49:11,900 --> 02:49:11,900 and if we have a site that's sitting there for eight years and it hasn't been built, We're going to be replacing it. So they have to be they have to have feasibility. And when 1375 02:49:18,380 --> 02:49:21,540 the developers approach, we have to consider those. And those are the ones that are presumed to be feasible because the developer has said This is what it takes. 1376 02:49:27,460 --> 02:49:27,460 right. That's a good answer. Okay. Again, time check. 1377 02:49:31,940 --> 02:49:35,540 nine minutes left. So I'll be quick, ma'am. Diane. Last name diane taylor, 213 grandview road. 14. 1378 02:49:39,890 --> 02:49:43,290 do you swear or affirm? Any testimony you may give will be truthful? Yes. Thank you. I do have just a couple questions. 1379 02:49:47,370 --> 02:49:47,370 well, I'll tell you. My father sold the property to jay and jay back in the 70s for the Purpose of bringing in commercial 1380 02:49:56,850 --> 02:49:56,850 type. I don't know what you want to call it, But instead of seeing 700 houses, a thousand houses, 1381 02:50:04,850 --> 02:50:04,850 whatever you're going to put in there. With that said, I know it was brought up about the ten acre zoning. 1382 02:50:10,730 --> 02:50:10,730 is there a line in the southland mountains where that ten acre zoning begins and ends? 1383 02:50:18,370 --> 02:50:18,370 yes. Like, I mean, we live about a half mile from the jnj or. 1384 02:50:23,130 --> 02:50:23,130 sorry, can you. And if we we own the farm at the top of the hill, And if we were to sell the farm, 1385 02:50:28,690 --> 02:50:28,690 we're ten acre zoning a half a mile away from this. 1386 02:50:32,770 --> 02:50:32,770 so what is that border? Or pretty much right at the at the end of the can view property. 1387 02:50:39,560 --> 02:50:39,560 so the sewer service area ends and that's where the limited manufacturing zone is. 1388 02:50:44,880 --> 02:50:44,880 so as you come up the hill, because they own a small little house that sits there on that Hill. 1389 02:50:50,560 --> 02:50:50,560 so you're telling me to basically my property line, My property line to fairview is where the ten acre zoning begins. 1390 02:51:05,080 --> 02:51:05,080 you're on the corner of grandview and fairview. 1391 02:51:10,000 --> 02:51:10,000 yes. And there's one small. You own the christmas tree farm, Right? 1392 02:51:14,240 --> 02:51:18,000 and there's two small lots on in the front along grandview. Right. One is ours, and one is the neighbors right on the corner. 1393 02:51:21,000 --> 02:51:21,000 yeah. Okay. So, yes, your property line is the dividing line. 1394 02:51:25,240 --> 02:51:28,280 it's limited manufacturing to you. And then it goes to mr.. So based on the map that I had seen that it doesn't look like they're going to develop From my property line to where that wetland sort of 1395 02:51:38,120 --> 02:51:38,120 begins down the road, correct? Yeah, I think the concept plan shows it in the area of the Buildings. 1396 02:51:48,160 --> 02:51:48,160 right? Sorry, I have a zoning map. There, there, There. 1397 02:51:53,680 --> 02:51:53,680 that's fine. Thank you. All right. Question answered. 1398 02:52:02,440 --> 02:52:02,440 okay. The other thing was, have you considered truly the impact on the schools? 1399 02:52:06,800 --> 02:52:06,800 I mean, I work for the school and we're nearing capacity, And you're going to put in 400 and some odd more houses. 1400 02:52:15,120 --> 02:52:15,120 average two kids to the schools. It's going to eventually affect all of us as taxpayers, Because you're going to ask for more taxes 1401 02:52:25,600 --> 02:52:25,600 so we can support the schools. So I can answer that. 1402 02:52:30,920 --> 02:52:30,920 the planning department does analyze that. We obtain the data directly from the school District, 1403 02:52:37,350 --> 02:52:37,350 and we apply a public school children ratio to the housing type. 1404 02:52:42,150 --> 02:52:44,390 so if it's apartment, townhome, single family. So all of the ratios that we develop are based on the actual numbers of public school Children residing in similar types of development in montgomery township. 1405 02:52:54,350 --> 02:52:54,350 we get that data from the school. Companion to that is the june 2024 enrollment report That the board of education prepares, 1406 02:53:02,470 --> 02:53:05,030 and they work with demographer doctor ross haber. They have for years. So he concluded in his 2024 report that the montgomery township Schools have decreased in enrollment between 2018 and 19 and 1407 02:53:14,470 --> 02:53:14,470 2023 and 24 school years. When reviewing earlier enrollments 2010 to 11, The enrollment was considerably higher 5091. 1408 02:53:23,630 --> 02:53:26,470 that's the bubble that sometimes we used to talk about. This indicates that notwithstanding added programs or repurposing of classrooms that the District will not have issues with instructional space over the next five years, 1409 02:53:36,030 --> 02:53:36,030 even with the impact of new housing added. The decline in enrollment should be mitigated, But will only reach current enrollment levels. 1410 02:53:44,390 --> 02:53:44,390 okay, so that's from the board of education's demographer, And he prepared that report. 1411 02:53:49,270 --> 02:53:49,270 so we did take the data that I talked about, The number of public school children that are generated by different developments in in 1412 02:53:57,550 --> 02:53:57,550 town. So through the can view plan through number of single family townhomes 1413 02:54:06,630 --> 02:54:06,630 condos, apartments there. Would we project 291 public school children. 1414 02:54:13,870 --> 02:54:13,870 okay. And that has different and this is based this is based on actual student numbers of Similar developments. 1415 02:54:21,670 --> 02:54:25,110 so country club estates that's our latest single family house. We take a look at every student that comes out of that development and we come up with That ratio. 1416 02:54:31,540 --> 02:54:31,540 so I heard you say two per. It may be surprising, But I'm telling you, we use actual data that we obtain from the school district. 1417 02:54:39,020 --> 02:54:39,020 that's 0.81 public school children per household. 1418 02:54:43,420 --> 02:54:46,660 for the townhomes we use the development across the street. That's 0.973 public school children. So that generates that's where we're coming up with That 2.91. 1419 02:54:53,540 --> 02:54:57,260 it's based on actual data that we obtain from the school. And we apply that that ratio to this. And 23 orchard would be 40, 56 public school 1420 02:55:06,940 --> 02:55:06,940 children. With the combination of 144 market rate, One and two bedroom units and 36 affordable 1421 02:55:16,740 --> 02:55:16,740 units. Now that between those two developments, We're looking at 347.96 students. 1422 02:55:24,860 --> 02:55:27,610 we did also run the numbers on the do nothing scenario. We call it the do nothing scenario. It means that we don't adopt a plan and we allow Developers, 1423 02:55:32,690 --> 02:55:32,690 if they're interested, they will come and they sue the township on the builder's remedy. 1424 02:55:37,210 --> 02:55:37,210 we use those numbers. And actually now I guess they're a little bit lower since I was Using the for market rate per and those would be so this number will be lower 1425 02:55:47,090 --> 02:55:47,090 than if we ran it a different way. 952 public school children. 1426 02:55:53,930 --> 02:55:53,930 so our plan does have 63% less public school children than if we did nothing. 1427 02:56:02,090 --> 02:56:02,090 and we we allowed the developers to just, you know, Come in with a plan and sue us, and we go before the judge to do that. 1428 02:56:11,450 --> 02:56:11,450 and that number I just want to say will be higher because I was using a mark, A different market rate, 1429 02:56:16,730 --> 02:56:20,570 the old market rate multiplier, which has increased. Okay. Last question is the sewage. Sewerage. I mean can you currently has their own Self-contained contained 1430 02:56:30,570 --> 02:56:34,210 treatment plant. What is this builder's plan? Are they going to try to tap into the one are. 1431 02:56:37,450 --> 02:56:37,450 the one that the school is currently using which is a public one or city sewer? 1432 02:56:42,730 --> 02:56:42,730 we all have wells and skeptics up there. So, You know, city sewer is something foreign to me a little bit. 1433 02:56:50,370 --> 02:56:50,370 but have you considered that impact on that system? 1434 02:56:55,890 --> 02:56:55,890 I didn't hear the what did you hear? The question is it has to do with the service area or Will there be an impact on your septic and. 1435 02:57:03,210 --> 02:57:06,170 well, well, obviously there'll be an impact on septic and. Well, because it has to do with the aquifer. But my question is can you currently has Their own treatment plan? 1436 02:57:12,610 --> 02:57:16,450 j and j have their own treatment hooked up to public sewer and public water. So there won't be an impact on the aquifer. They won't be drawing from the same aquifer That your well does. 1437 02:57:21,290 --> 02:57:21,290 so it will be city water they're going to be connecting then to like the sullivan lake, Which is what the school is at that septic. 1438 02:57:28,400 --> 02:57:28,400 yes. That the the skillman village plan, gilman village, Sullivan lake, depending how long you lived here. 1439 02:57:37,400 --> 02:57:37,400 I think one more question. And it's just with all the traffic, Whether it's the trucks or the cars that you feel are going to be up and down 1440 02:57:46,960 --> 02:57:46,960 this country road. A traffic light at the bottom of grandview and 601 with the railroad Track being there. 1441 02:57:54,080 --> 02:57:54,080 if you've ever driven on that road at any rush hour, You can't make a left for a very long time. 1442 02:58:03,320 --> 02:58:03,320 so the our traffic engineer said, under any of the scenarios, Whether it's the bi-rite, so the existing zoning, 1443 02:58:10,080 --> 02:58:10,080 if they were to redevelop under the existing zoning or a residential plan, A traffic light is warranted at that intersection because years ago with j and j, 1444 02:58:19,960 --> 02:58:23,710 you had mentioned like 7000 cars in 24 hours. There were not 3500 employees at j&j. We didn't have that traffic at all. 1445 02:58:29,830 --> 02:58:29,830 I don't think they were saying that was the traffic under the if they were to redevelop Under the flex, 1446 02:58:36,590 --> 02:58:40,070 the office, the not the not back then under j and j. No, but it would still be the same type of limited manufacturing or, You know, trucks or whatever coming in and out of there and never at full 1447 02:58:51,630 --> 02:58:51,630 capacity that they were running. Was there ever that much traffic? 1448 02:58:55,950 --> 02:58:55,950 I what is it the it the institute of. I'm just thinking the traffic impact is going to be Big either way, 1449 02:59:02,350 --> 02:59:02,350 whether it's housing and or left at limited manufacturing or and they'll you'll have to Consider that because 601 will become the new 1450 02:59:11,750 --> 02:59:11,750 206. Thank you. Thank you. Sand car. Okay. Actually, That was going to be the last 1451 02:59:21,470 --> 02:59:21,470 question, laurie, for tonight. We have reached 8:00. 1452 02:59:28,110 --> 02:59:28,110 we're close. I mean, is it is it possible that we would continue tonight? 1453 02:59:33,870 --> 02:59:33,870 I mean, I would be amenable to that. I think it's a preferable solution then coming back. 1454 02:59:42,950 --> 02:59:45,430 thursday is a limited time. We have a community event. That's the community we all want to participate in. 1455 02:59:48,630 --> 02:59:48,630 so I would extend my time personally. Yep. I just want to make sure everybody gets a Chance to be heard. 1456 02:59:55,550 --> 02:59:55,550 okay. So we do it today. So can we get an idea of how many folks still have to go? 1457 03:00:01,030 --> 03:00:04,190 how many more questions do we have? Raise hands. One. Two more. Three more questions. Would people like to forego their questions and go to Comments? 1458 03:00:15,230 --> 03:00:18,060 no. I want to go through all the finish the question. Yeah, let's finish it off. They got three. Yeah. 1459 03:00:21,580 --> 03:00:24,900 I we can't be here forever, is what? The point is. We can't be here forever. Here. Is that okay? 1460 03:00:32,060 --> 03:00:32,060 before before this gentleman comes up. How many people have comments to make? 1461 03:00:38,060 --> 03:00:38,060 well, frank. Five. Six. Seven. Okay, so if we limit everyone's comments to three minutes, Does everybody promise to try to stick to that 1462 03:00:48,180 --> 03:00:48,180 30 minutes. Okay. Very good. I'm sorry. It seems logical to 1463 03:00:57,780 --> 03:00:57,780 me. I'm going to get three minutes to interview. 1464 03:01:04,060 --> 03:01:06,860 okay. We can stop. We can stop now. Okay. Yes. So we can stop. We we can I it. We have to be reasonable, right? 1465 03:01:10,860 --> 03:01:10,860 we can stop now. You ken. It's ridiculous. Why don't you stand up for us and fight and do These 1466 03:01:20,780 --> 03:01:24,300 things? We don't have this at all. Why do you let it get this far? We don't even need to the day before. You should be fighting for us. 1467 03:01:27,860 --> 03:01:27,860 what did you say? Thank you. Sir. Sir. Sir. Sir. 1468 03:01:36,100 --> 03:01:39,220 sir! I can't hear you. Please, sir. We have a lot of people. I hear you, sir. Sit down please. Okay. Shame. 1469 03:01:46,100 --> 03:01:49,060 shame on it. I think I think we should stop this for tonight, Then. I was willing, I was willing, I was, I was willing to offer my time. 1470 03:01:53,700 --> 03:01:53,700 yeah, I was okay. We will continue this till thursday night at 5:00. 1471 03:01:58,820 --> 03:02:02,020 we've noticed. Correct. Thank you sir. Yes. Thank you. So we will continue this to thursday at 5 p.m.. 1472 03:02:07,460 --> 03:02:09,740 we are. What happens when we're not reasonable? Right. We're done. Well, I think I don't.