1 00:00:00,000 --> 00:00:10,760 I will call me in order. Welcome to the discussion session for March 22nd. We will begin the meeting with management bills or viewing agenda items. 2 00:00:13,700 --> 00:00:29,900 Thank you, Mr. President. It's nice regular meeting. We have the consideration of our three statements of our investment policy statement for the amount of pension plans. These are changes to the existing investment policy statement, including changes to asset allocations further defining alternative. 3 00:00:29,900 --> 00:00:36,160 investments and add a definition of real assets. We have our appointments and 4 00:00:36,160 --> 00:00:41,420 reappointments to our municipal boards. We have the consideration to purchase 27 5 00:00:41,420 --> 00:00:48,020 fees or smart weapons. We will be replacements. We have a consideration to purchase two vehicles. 6 00:00:48,800 --> 00:00:54,620 We have the consideration of fees for the annual street sweeping program and the consideration 7 00:00:54,620 --> 00:00:59,120 for the award of the 2022 Rick Street repair program. 8 00:01:01,300 --> 00:01:01,760 Awesome. 9 00:01:02,280 --> 00:01:02,500 All right. 10 00:01:02,660 --> 00:01:06,640 Next up on the agenda is the Parks Master Plan and the Recreation Center Feasibility Study. 11 00:01:06,860 --> 00:01:16,160 We have a system planery and the means and careling egg of environmental planning designs who are presenting final on what has been a long and very good project. 12 00:01:17,160 --> 00:01:19,140 Thank you very much for having us. 13 00:01:19,140 --> 00:01:25,380 and thank you two missionaries for your continued support of the project as we've gone through it 14 00:01:25,380 --> 00:01:32,480 more or less over the past year without the our peer on this time last year and the project really 15 00:01:32,480 --> 00:01:39,180 started in around June of last year and now we're here at the end of the first quarter of 2022 to 16 00:01:39,180 --> 00:01:47,680 present the final reports. So just as an overview will kind of run through the structure of the project 17 00:01:47,680 --> 00:01:53,600 is a whole the report itself is broken down into three primary sections. There are system-wide 18 00:01:53,600 --> 00:01:59,180 recommendations, there are site specific recommendations, and then there's the recreation center feasibility 19 00:01:59,180 --> 00:02:04,340 study portion of the report, and then we'll conclude by talking about some next steps and where we go. 20 00:02:05,840 --> 00:02:12,780 So the core project team that was put together, and there are many, many people to thank as we work 21 00:02:12,780 --> 00:02:16,960 through the process. Our commission project champions, which was Commissioner Ranning, 22 00:02:17,080 --> 00:02:22,460 Commissioner Silverman. Commissioner Flynn also attended some meetings both as Commissioner 23 00:02:22,460 --> 00:02:27,980 and as sort of a liaison to the Environmental Sustainability Board. We had representatives from the 24 00:02:27,980 --> 00:02:32,340 Parks Advisory Board and Sports Advisory Board that were very helpful throughout the process. 25 00:02:32,660 --> 00:02:37,560 Municipal staff members for the Support Public Works Director, David and Eleanor Recreation Director 26 00:02:37,560 --> 00:02:39,800 their filibolio, our park facilities coordinator, 27 00:02:40,320 --> 00:02:42,540 a variety of community members who participated 28 00:02:42,540 --> 00:02:43,480 throughout the process. 29 00:02:44,260 --> 00:02:46,280 We had three different public surveys 30 00:02:46,280 --> 00:02:48,420 that we put out, and in total, 31 00:02:48,640 --> 00:02:50,840 I believe had over 3,000 total responses 32 00:02:50,840 --> 00:02:52,020 to all those public surveys. 33 00:02:52,300 --> 00:02:54,440 So the community was routinely involved 34 00:02:54,440 --> 00:02:55,300 throughout the process, 35 00:02:55,660 --> 00:02:57,960 and then our consultants from environmental planning 36 00:02:57,960 --> 00:03:00,400 and design, which Carolyn Yagelis here with us, 37 00:03:00,560 --> 00:03:05,160 the sports facilities group, Susie Fisher. 38 00:03:05,420 --> 00:03:05,700 Thank you. 39 00:03:05,700 --> 00:03:18,700 We'll be joining us a little bit later, be a Zoom to help with some of the presentation as well, along with Madison Borsos from E.P.D., and I'm going to ask your office team as a whole. 40 00:03:18,940 --> 00:03:23,520 Yes, yes, they've all been great to work with and helped us through the process tremendously. 41 00:03:24,020 --> 00:03:25,880 It wasn't actually shot, I don't know. 42 00:03:26,580 --> 00:03:29,060 So that was during one of our parks tours. 43 00:03:29,060 --> 00:03:31,640 first. It looks like Peter Argentine. 44 00:03:39,800 --> 00:03:44,300 So yeah, this was from one of our parks tours that 45 00:03:44,300 --> 00:03:49,540 we did last summer. So that leads us into the next slide, which is kind of a walk through 46 00:03:49,540 --> 00:03:53,140 the process that we went through for all the input. So like I said, there was three public 47 00:03:53,140 --> 00:03:58,520 surveys. The first one focused on what does the community want in the parks. The second one 48 00:03:58,520 --> 00:04:03,080 focused on sort of drilling down into some of those and getting some additional details on what 49 00:04:03,080 --> 00:04:09,380 the community wants. And then as we took all that information combined with some of the open-ended 50 00:04:09,380 --> 00:04:15,220 comments that we received on the surveys, you know, feedback from attendants and community events, 51 00:04:15,940 --> 00:04:21,340 the site visits, which we just mentioned, as well as some, you know, market studies and data 52 00:04:21,340 --> 00:04:26,420 and demographic inputs, as well as some focus group meetings. We had a joint meeting of the 53 00:04:26,420 --> 00:04:28,160 the parks advisory and sports advisory board 54 00:04:28,160 --> 00:04:30,180 towards the beginning of the process as well as 55 00:04:30,180 --> 00:04:32,120 continued meetings of the project team 56 00:04:32,120 --> 00:04:35,440 kind of all fed into a set of considerations. 57 00:04:36,520 --> 00:04:38,680 And then we took those considerations back 58 00:04:38,680 --> 00:04:41,120 to the parks and sports board to the commission 59 00:04:41,120 --> 00:04:42,820 and to the public for the third survey 60 00:04:42,820 --> 00:04:44,520 to get some feedback on those kind of, 61 00:04:44,700 --> 00:04:46,060 make sure we were on the right track 62 00:04:46,060 --> 00:04:48,660 before we kind of formalized those considerations 63 00:04:48,660 --> 00:04:49,960 into recommendations. 64 00:04:50,300 --> 00:04:53,760 We presented the sort of first draft of recommendations 65 00:04:53,760 --> 00:05:00,560 to the commission in January of this year and now have developed them into the final draft report of the plan. 66 00:05:01,580 --> 00:05:10,640 The first draft report, there was an opportunity for review as well by the commission, the parks advisory board, the sports advisory board, and municipal staff. 67 00:05:10,880 --> 00:05:13,180 So we did get some good feedbacks through that process as well. 68 00:05:13,900 --> 00:05:18,400 So we are, as you can see, by our bright or tarot here at pretty much the end of the process. 69 00:05:18,400 --> 00:05:21,460 So this is the presentation on the final plan. 70 00:05:22,240 --> 00:05:26,500 Any other final tweaks to what we have will be done over the next few weeks. 71 00:05:26,660 --> 00:05:29,560 The final plan will be issued by the end of the month. 72 00:05:29,880 --> 00:05:33,060 And then the commission can formally adopt it by resolution in April. 73 00:05:34,060 --> 00:05:36,140 I'm getting ahead of myself that to the next step slide. 74 00:05:39,100 --> 00:05:39,580 Okay, 75 00:05:41,700 --> 00:05:48,380 so do I do zero? 76 00:05:49,180 --> 00:05:52,940 One of the things we looked at was kind of ownership of who owns the parks, right? 77 00:05:53,180 --> 00:05:58,840 So there are 12 parks that are both owned by and located in Mount Lebanon. 78 00:05:59,340 --> 00:06:03,620 There's one park, Twin Hills Park, that is owned by Mount Lebanon, but located in Scott 79 00:06:03,620 --> 00:06:03,860 County. 80 00:06:03,880 --> 00:06:05,140 That's the one up here. 81 00:06:05,720 --> 00:06:09,680 There are two that are owned by other entities, but operated by Mount Lebanon. 82 00:06:09,880 --> 00:06:14,560 That's better crop park and church place park, and then one that is owned and operated by 83 00:06:14,560 --> 00:06:20,060 the borough of Dormont, but located in Mount Leibnett, which is big snider park over here. So this map 84 00:06:20,060 --> 00:06:26,880 here on the side contains in green the municipal parks and then the dots are the public school 85 00:06:26,880 --> 00:06:31,940 facilities within Mount Leibnett that also have kind of recreational assets, whether that be 86 00:06:32,780 --> 00:06:37,500 tracks or fields or anything like that, just kind of given order playgrounds, just to kind of give a 87 00:06:37,500 --> 00:06:43,120 sense for, you know, a radius of how much of the community is actually within a decent walking 88 00:06:43,120 --> 00:06:48,460 distance of some kind of recreational asset. And it is, as you can see, almost the entire 89 00:06:48,460 --> 00:06:54,640 community. So the brighter than yellow, the more there is the opportunity for someone to 90 00:06:54,640 --> 00:06:56,680 get there quickly. Yes. 91 00:06:58,840 --> 00:07:05,440 Of these 16 municipal park areas that we kind of studied, five contained 92 00:07:05,440 --> 00:07:10,420 forest areas, nine contained courts and four contained fields. So that's kind of an important 93 00:07:10,420 --> 00:07:12,720 and distribution to keep in mind as we work through. 94 00:07:12,940 --> 00:07:15,800 There are also shows that we have a very good distribution 95 00:07:15,800 --> 00:07:17,780 of assets throughout our parks 96 00:07:17,780 --> 00:07:19,040 that we have different offerings 97 00:07:19,040 --> 00:07:20,960 for different people of different ages 98 00:07:20,960 --> 00:07:22,100 and different ability levels. 99 00:07:23,260 --> 00:07:26,220 So one key definition as we work through this 100 00:07:26,220 --> 00:07:27,900 is programming versus pickup play. 101 00:07:28,440 --> 00:07:32,300 So programming is kind of a set of organized events 102 00:07:32,300 --> 00:07:34,460 and opportunities sometimes requiring a fee 103 00:07:34,460 --> 00:07:36,320 versus pickup play is more spontaneous. 104 00:07:36,760 --> 00:07:38,640 So if you want to think about it in terms of tennis, 105 00:07:38,640 --> 00:07:48,300 The Tennis Center has program because you can pay for lessons, you can pay for events there, you can pay to just use the facilities, verses, 106 00:07:49,140 --> 00:07:57,960 Metacross Park, Williamsburg Park, some of our other parks that just have kind of pick up play tennis courts there, you don't have to pay to use those, you can just walk up and start playing. 107 00:07:57,960 --> 00:08:13,080 So just a key definition to kind of keep in mind as we start talking about you know programed areas versus pickup play areas and what we're looking at is kind of that definition of the programming is something specific kind of to that structure versus pickup. 108 00:08:16,100 --> 00:08:18,700 Okay, now I will turn it over to Carolyn. 109 00:08:21,380 --> 00:08:30,620 So the first set of recommendations is going to be looking at this system-wide type of consideration. 110 00:08:31,520 --> 00:08:39,000 And the way in which we have evolved from some of the people's questions and replies over the course of the fall. 111 00:08:39,660 --> 00:08:48,100 And then the considerations for I believe the appendix of this is ultimately over a thousand pages of information. 112 00:08:48,100 --> 00:08:57,280 from your different departments that we reviewed and tried in the ways to evaluate sort of relationships between things that are happening. 113 00:08:58,000 --> 00:09:05,220 And so being able to get that information ultimately organized in a way, whether that's in the database, 114 00:09:05,460 --> 00:09:15,040 so that it's sort of cross department accessible is something as a glimpse when we're looking at something beyond the sites themselves. 115 00:09:15,040 --> 00:09:26,880 because in order for the success of the sites to exist, the system of parks, recreation, and all this care needs to be sort of on that equal field, right? 116 00:09:29,620 --> 00:09:41,560 So the way in which the system-wide recommendations have been established and we started this kind of introduction and language at the end of 2021. 117 00:09:41,560 --> 00:09:54,720 When we were thinking about different priorities, they are generally having a draw toward one of six areas, community, safety, amenity, efficiency, connectivity, and identity. 118 00:09:55,380 --> 00:10:09,380 Now, is there some relationship between some of these topics and that could cover one recommendation? Yes, there is. However, there is a general way in which each recommendation has an emphasis. 119 00:10:09,380 --> 00:10:15,340 So that is how, as we go through the report, these are organized. 120 00:10:15,960 --> 00:10:22,920 So I think if we keep moving, then, what we have done since our discussions of the end 121 00:10:22,920 --> 00:10:31,800 of January, we introduce the concept of how do we take all the possibilities of recommendations 122 00:10:31,800 --> 00:10:34,380 of where there are over 180 in total. 123 00:10:35,500 --> 00:10:40,320 And think about that as it relates to what a system might, 124 00:10:40,880 --> 00:10:42,980 and then again, what is facility specific. 125 00:10:43,680 --> 00:10:47,200 Here we have the ones that are system might, right? 126 00:10:47,780 --> 00:10:51,720 And then they fall into some categories. 127 00:10:52,240 --> 00:10:55,340 They also then incorporate where there is a relationship 128 00:10:55,340 --> 00:10:56,420 with those specifics. 129 00:10:56,540 --> 00:10:57,860 So you can see them enumerated. 130 00:10:58,120 --> 00:11:00,680 So the community ones, which is looking broadly, 131 00:11:00,680 --> 00:11:07,420 there are 10, safety, there are 50, amenity, there are shy of 60, efficiency with 132 00:11:07,420 --> 00:11:13,300 got a dozen, connectivity of 33, some lucky number in Westmoreland County as 133 00:11:13,300 --> 00:11:21,800 opposed, and then identity with got several up to 30 there. Now, so the way in 134 00:11:21,800 --> 00:11:27,020 which we considered how these recommendations relate to one or another is 135 00:11:28,860 --> 00:11:36,820 What is a time commitment that each recommendation is like anticipated to take? 136 00:11:37,140 --> 00:11:44,660 That does not mean in the continuum of 2022 starting point all the way to a decade out. 137 00:11:44,960 --> 00:11:54,200 It means once the recommendation is generally initiated, how long is there anticipated to be some sort of commitment to see that through? 138 00:11:54,200 --> 00:11:57,900 So that is sort of our target time plane at the top. 139 00:11:58,160 --> 00:12:01,500 So we have from zero to one year, one to three years, 140 00:12:01,820 --> 00:12:04,400 then we move into a three to five and over five. 141 00:12:05,320 --> 00:12:09,740 When we cross that with the relationship of costs, 142 00:12:10,280 --> 00:12:14,200 there is a consideration, and then we are almost midpoint 143 00:12:14,200 --> 00:12:18,700 in our diagram, is looking at that other access 144 00:12:18,700 --> 00:12:25,440 this of the potential for the range of potential investment 145 00:12:25,440 --> 00:12:27,660 for these recommendations. 146 00:12:28,440 --> 00:12:31,180 So going up the side of the Nexus, 147 00:12:31,640 --> 00:12:36,500 that we have a zero to 10,000 category, the 10 to 100,000. 148 00:12:36,980 --> 00:12:39,100 And then once we move above the dark line, 149 00:12:39,300 --> 00:12:43,140 we start to move into a different kind of discussion potentially 150 00:12:43,140 --> 00:12:47,200 in terms of how either funding has the ability 151 00:12:47,200 --> 00:12:54,440 to either be pursued or then kinds of targets for the types of funding to pursue or the timing 152 00:12:54,440 --> 00:13:00,820 and the level of commitment that kind of funding would have. So we go then from the 100 to the 153 00:13:00,820 --> 00:13:06,920 500,000 and then half a million and two a million and then we start moving up about that. So 154 00:13:07,680 --> 00:13:15,760 from a standpoint of trying to organize this information so that we can think about what has the 155 00:13:15,760 --> 00:13:28,400 opportunity to have the short term commitment and a relatively short frame or short type of funding allocation. 156 00:13:29,240 --> 00:13:41,360 And then as we move up and to the right of those kind of time frames down those general cost increases within the report there is a set of things that are all numbered. 157 00:13:41,360 --> 00:13:49,140 So it looks a little bit magical from that perspective so that anyone ultimately using this is going to be able to understand what these are. 158 00:13:50,980 --> 00:13:52,480 Thank you so much. 159 00:13:53,060 --> 00:14:06,600 All right, so as we go through each of these and we will want to make sure that we have the time of ultimately handed off for the park specific recommendations back to Ian, we consider what these system want items are. 160 00:14:06,600 --> 00:14:15,020 So from a standpoint of the community and these 10th, we're looking really at what happens 161 00:14:15,020 --> 00:14:19,420 as part of programming, building upon and enhancing what is done today. 162 00:14:19,900 --> 00:14:27,280 So the cross-section of to whom programs reach and the opportunities to participate is 163 00:14:27,280 --> 00:14:28,080 far in line. 164 00:14:28,580 --> 00:14:34,840 The effectiveness and efficiencies of those types of things, it has the ability to be a focus 165 00:14:34,840 --> 00:14:41,080 is here, and furthering that, and also in the potential to even bring in other types 166 00:14:41,080 --> 00:14:45,840 of partners, or expanding those partners, such as the educational programs, right? And 167 00:14:45,840 --> 00:14:52,920 ultimately, as we've seen in the last couple of years, then for one reason or another general 168 00:14:52,920 --> 00:14:55,260 or a recreation program in sort of Nationwide. 169 00:14:55,760 --> 00:14:59,980 People seeking recreation that is not always a 170 00:15:00,000 --> 00:15:29,720 Any, an athletic pursuit. So those passive types of opportunities for the one, the one time type of programming opportunity where they're not needed to commit week after week, same time slot after team time slot when there's a lot to ultimately have those choices. What is sort of the one opportunity where maybe I can get something that has not been offered in the community recently. 171 00:15:29,720 --> 00:15:34,260 or maybe they're bringing it back because they want a different level of that, but more 172 00:15:34,260 --> 00:15:39,880 of a broader education for a dabble of chup, I'll call it, into the water of something 173 00:15:39,880 --> 00:15:42,000 to try different kinds of things out. 174 00:15:42,880 --> 00:15:47,700 So our curiosities are heightened for different reasons, and so being able to convey that and 175 00:15:47,700 --> 00:15:53,040 offer that into recreation programming is an opportunity here in that level and furthering 176 00:15:53,040 --> 00:15:53,460 what we have. 177 00:15:53,920 --> 00:15:59,240 So the other aspect of this is looking sort of at that element of when programs are provided 178 00:15:59,240 --> 00:16:01,960 and to whom, gaining the different age practice. 179 00:16:02,480 --> 00:16:05,320 You do offer different things at different times. 180 00:16:05,820 --> 00:16:08,580 As those kinds of things we cross over 181 00:16:08,580 --> 00:16:12,200 what is potentially for the educational programming 182 00:16:12,200 --> 00:16:14,020 to when that is and to the body, 183 00:16:14,220 --> 00:16:16,560 you start to see some relationships here. 184 00:16:17,040 --> 00:16:19,260 So while there are 10 recommendations again, 185 00:16:19,620 --> 00:16:22,920 there is a consideration for how these relate to one another. 186 00:16:23,820 --> 00:16:28,200 The other aspect of this is both a communications element 187 00:16:28,200 --> 00:16:35,600 of programming and then translating that back in to from what people may have an interest 188 00:16:35,600 --> 00:16:44,680 almost looking at what the municipality seek out or with whom they could partner for 189 00:16:44,680 --> 00:16:48,880 other kinds of things that may not have been yet done here in the municipality, but maybe 190 00:16:48,880 --> 00:16:49,800 there's a growing interest. 191 00:16:50,300 --> 00:16:56,520 So being able to every now and then time frames to be decided of course that there is a reach 192 00:16:56,520 --> 00:17:04,220 out to the residents to sort of serving but getting input on what may be of interest and then 193 00:17:04,220 --> 00:17:09,960 determining what the feasibility of that is whether it's offered completely as a municipal effort 194 00:17:09,960 --> 00:17:15,940 or it's a joint type of thing. And so then how does that information get conveyed and how does 195 00:17:15,940 --> 00:17:22,780 it get into almost an incorporation of the overall website and other kinds of communication that are 196 00:17:22,780 --> 00:17:27,400 happy. So really, that's what we could look at that as almost efficiency and 197 00:17:27,400 --> 00:17:32,140 effective at element. We have looked at this as a community benefit. So here 198 00:17:32,140 --> 00:17:36,220 highlighting the kinds of things as it relates to publicizing the programming 199 00:17:36,220 --> 00:17:42,540 and thinking about the access of that information. One other thing else is good. 200 00:17:42,860 --> 00:17:47,120 I just had a question before you move to the next slide because this is a lot of 201 00:17:47,120 --> 00:17:50,280 what you're talking about in the slide is actually a smartphone for recreation 202 00:17:50,280 --> 00:17:59,880 to do an assessment of a program for offering, see which demographics we're serving and to focus on programming. 203 00:18:00,420 --> 00:18:04,480 There's a note in here about producing a quarterly recreation report. 204 00:18:05,020 --> 00:18:09,220 The recreation department currently produces a monthly report. 205 00:18:09,720 --> 00:18:13,100 Are you looking for something specific related to programming? 206 00:18:13,100 --> 00:18:28,020 I think when we were evaluating the information and some of that background information that we were looking and provided as they almost on annual report side was sort of our target when we were thinking about quarterly. 207 00:18:28,340 --> 00:18:35,960 So the types of information that ultimately have been sort of through the through time in the annual report. 208 00:18:35,960 --> 00:19:01,980 There is the opportunity maybe to blend some of that in the monthly elements because I think when you look at almost seasons right monthly is helpful from a standpoint of okay, here's the work that's been done, here's the kind of activity that we have from a standpoint of quarterly I think there's the we think there's a greater opportunity to make it look at some trends as it may relate to either different seasons of the year. 209 00:19:01,980 --> 00:19:06,380 or other things that are going on with other groups 210 00:19:06,380 --> 00:19:08,140 are providing at the same time. 211 00:19:08,680 --> 00:19:11,520 And you were going to likely be able to get 212 00:19:11,520 --> 00:19:14,320 that kind of information from other providers, 213 00:19:14,320 --> 00:19:17,420 whether it's in the private sector, at a different scale. 214 00:19:17,720 --> 00:19:19,260 So that's how we were thinking about, 215 00:19:19,720 --> 00:19:23,040 maybe those monthly reports are beneficial. 216 00:19:23,980 --> 00:19:26,240 And ultimately, I think, from the publication 217 00:19:26,930 --> 00:19:29,860 and that evaluation that you're talking about 218 00:19:29,860 --> 00:19:35,460 of how do we how do people participate if people think about not necessarily what they're doing 219 00:19:35,460 --> 00:19:40,120 if they're asked questions what you're doing specifically in February but what are you doing 220 00:19:40,120 --> 00:19:46,360 in the winter time right so being able to look sort of at a broader time period from the resident 221 00:19:46,360 --> 00:19:51,280 standpoint they're able to consider all right what is our house we're doing over the course of the 222 00:19:51,280 --> 00:19:55,620 winter season and so it will be able to tie some of that information together what could be surveyed 223 00:19:55,620 --> 00:19:59,040 as well as then what ends up happening as part of the test. 224 00:19:59,240 --> 00:20:02,660 It would sound cool, and one of the other things I've suggested to our recreation directors, 225 00:20:03,140 --> 00:20:07,780 we might may want to develop sort of a very short post-participant survey. 226 00:20:08,220 --> 00:20:12,960 Yes. So after you've been through a program, just a very brief set of questions about, 227 00:20:13,320 --> 00:20:17,420 you know, was it good, what recommendations, but you made future programs, 228 00:20:17,420 --> 00:20:20,680 it's something different that you would like to have that we don't have. 229 00:20:20,680 --> 00:20:27,220 or on the scale of x, y, would you like to repeat that? I mean, do this again, or would you like 230 00:20:27,220 --> 00:20:33,400 the next level of potentially one is offered completely? And if it's no more than five questions, 231 00:20:33,400 --> 00:20:39,920 I mean, I think they get to three where they've got, you know, the 45 seconds almost before they 232 00:20:39,920 --> 00:20:44,020 put their coat on, chat with their friends and those kinds of things and you can shove it in the box 233 00:20:44,020 --> 00:20:49,680 or do it right there. There's a code saying after it and say thank you very much. Yeah, that would be 234 00:20:49,680 --> 00:20:59,300 something that you could then pull into. Again, looking at that quarter of, all right, of all the things that we offer, what was the most popular in the winter? 235 00:21:00,060 --> 00:21:08,420 Or, you know, what's the likelihood of us thinking about doing that again? Or what will we hone about it so that we people could have an interest in participating? 236 00:21:09,400 --> 00:21:09,840 Thank you. 237 00:21:09,960 --> 00:21:10,640 Yes. Thanks. 238 00:21:10,640 --> 00:21:16,200 I'm just filling up with Mr. McGill's comment to some of these recommendations here are also 239 00:21:16,860 --> 00:21:20,300 sort of in line with initiatives that are currently underway. So some of the 240 00:21:20,300 --> 00:21:25,300 items about communications or information on the website, like we're currently going through a massive 241 00:21:25,300 --> 00:21:30,740 website renovation project. So these recommendations are also in line with some of those other 242 00:21:30,740 --> 00:21:34,960 additional initiatives. The Sports Advisory Board right now is going through an assessment of the 243 00:21:34,960 --> 00:21:39,700 use of all the sports fields and courts. So you know that it's in line with those as well. 244 00:21:39,700 --> 00:21:53,680 And I think we did have the great benefit of having outreach in the summer and in the early fall because then we were able to think about some of these things and that was coming out as sort of some of the mid report. 245 00:21:54,880 --> 00:22:03,680 Meeting discussion and then you all being able to incorporate that at a deeper level for this year and coming out this fantastic so well underway. 246 00:22:03,680 --> 00:22:13,640 Here we go. So safety hits about a dozen I believe. And there is an element to this that is both the 247 00:22:15,680 --> 00:22:22,100 physical interaction with some things. And it's also a consideration for what is actually 248 00:22:22,100 --> 00:22:30,540 happening on the land itself in terms of some of the management of that landscape. So this is both 249 00:22:30,540 --> 00:22:38,280 a safety of a person and safety of property. And I think as part of any 250 00:22:38,280 --> 00:22:43,820 parks and recreation sort of pursued at this level, there are some things here 251 00:22:43,820 --> 00:22:48,200 where then I believe you also have the opportunity as a municipality to 252 00:22:48,200 --> 00:22:53,000 consider how they cross over with storm water management efforts that you're 253 00:22:53,000 --> 00:22:59,440 doing. At what point in time do we want to ensure that those types of policies 254 00:22:59,440 --> 00:23:05,880 these are then going to also be able to be fulfilled within the park specific improvements. 255 00:23:06,700 --> 00:23:12,460 So if the policies about, I'll just think I'm sorry, I wanted to say, because you guys 256 00:23:12,460 --> 00:23:23,200 are also interested of considering what is happening for our picture here on the right. 257 00:23:23,200 --> 00:23:30,040 And what does that mean if there were going to be potential improvements to a facility 258 00:23:30,040 --> 00:23:32,200 that may be in this type of location? 259 00:23:32,420 --> 00:23:35,160 When this was constructed, rules are also different. 260 00:23:35,800 --> 00:23:41,340 And what do we need to consider now, or the way in which some of the event just run off? 261 00:23:41,480 --> 00:23:46,600 It has a different pattern from when some of these other facilities were originally constructed. 262 00:23:46,600 --> 00:23:53,640 There are elements of thinking about fencing, I think, over time when we look at both the 263 00:23:53,640 --> 00:23:58,180 court areas or field areas where the student needs was highlighting those parts exist. 264 00:23:58,640 --> 00:24:07,920 That is something that is an ongoing consideration and a cost that is incurred. 265 00:24:08,080 --> 00:24:15,040 But there is a life cycle to fence and people playing on some of these fields interact with 266 00:24:15,040 --> 00:24:15,640 it directly. 267 00:24:15,640 --> 00:24:22,320 So being able to consider some of the system-wide recommendations and how they fit into general 268 00:24:22,320 --> 00:24:28,120 capital improvement cycles I think is another element of this report that was a consideration 269 00:24:28,120 --> 00:24:35,000 and how we were trying to evaluate and offer out some considerations for potential priorities 270 00:24:35,000 --> 00:24:36,460 for you all. 271 00:24:36,860 --> 00:24:44,340 There is a specific set of discussion that occurs on a month by month basis when it came to 272 00:24:44,340 --> 00:24:50,000 looking at sort of the forestry and a base of species management components of this as well as 273 00:24:50,000 --> 00:24:56,760 then wildlife management and then trail management and restoration plants so without over using the 274 00:24:56,760 --> 00:25:03,440 word management as it relates to safety we have recognized is significant element and this is going 275 00:25:03,440 --> 00:25:13,120 to entail an important set of discussions that happen on a reoccurring basis between both the 276 00:25:13,120 --> 00:25:20,620 public worst department and the recreation department because I think the way in which there are 277 00:25:20,620 --> 00:25:28,860 different roles for in cases of public works as a primary provider or a leader in some of these 278 00:25:28,860 --> 00:25:35,840 recommendations. At points in time, the recreation department is going to have a fold into some of 279 00:25:35,840 --> 00:25:41,500 these discussions. That may be different than in the past but I think again to get out of each of 280 00:25:41,500 --> 00:25:46,500 these issues. So having a robust discussion at those points in time is important about each 281 00:25:46,500 --> 00:25:50,500 of these and how that affects both departments and the municipalities. 282 00:25:51,220 --> 00:25:51,740 Okay. 283 00:25:56,550 --> 00:26:01,550 This one is easy one. I think for the general population to think about in terms 284 00:26:01,550 --> 00:26:05,850 of when they think about parks and recreation, they think about the actual physical and 285 00:26:05,850 --> 00:26:12,790 critical amenities themselves. So from a standpoint of again looking at where there are each 286 00:26:12,790 --> 00:26:19,690 each of these facilities and I'll let Ian get into the specifics of those from a higher level 287 00:26:19,690 --> 00:26:28,390 of is there's an opportunity to expand some things, again, grow from what exists and then thinking 288 00:26:28,390 --> 00:26:37,490 about the inclusivity of what is being offered, both from an age aspect as well as in that 289 00:26:38,570 --> 00:26:46,590 abilities aspect. And that then also translates into some general elements of comfort. As it is 290 00:26:46,590 --> 00:26:53,630 surprising to some and not surprising to many, a lot of discussions about comfort come up in 291 00:26:53,630 --> 00:26:59,390 terms of parks and recreation and a viadak. We could just talk about restrooms for the rest of the 292 00:26:59,390 --> 00:27:06,470 evening. But in the in light of the many other things that we have going on, there are some elements where 293 00:27:06,470 --> 00:27:11,150 There are some considerations for other kinds of facilities. 294 00:27:11,770 --> 00:27:16,810 And there is definitely been, as going through this process, a consideration of what the 295 00:27:16,810 --> 00:27:21,190 scale of that improvement is, what the cost of that potential, capital improvement is, 296 00:27:21,470 --> 00:27:29,030 and probably most significantly, what the long-term maintenance costs and time of actually 297 00:27:29,030 --> 00:27:31,370 caring for these improvements is. 298 00:27:31,370 --> 00:27:36,030 So that, I think, is important to think about. 299 00:27:36,350 --> 00:27:37,150 I have a question. 300 00:27:37,350 --> 00:27:38,710 What, of course, amenities? 301 00:27:39,170 --> 00:27:40,750 What, what does that mean? 302 00:27:41,570 --> 00:27:44,510 As part of that site's consideration, 303 00:27:45,130 --> 00:27:48,330 there were an incident on highlight of a few items from some 304 00:27:48,330 --> 00:27:51,390 and later that's from, from that, but it's something where 305 00:27:51,390 --> 00:27:55,430 that had a number of different kinds of things 306 00:27:55,430 --> 00:27:59,050 from routes to structures and some renovations. 307 00:27:59,050 --> 00:27:59,290 So 308 00:28:01,690 --> 00:28:08,550 if we go in to the next aspect, and we'll quickly think about efficiency and some 309 00:28:08,550 --> 00:28:14,170 efficient standpoint, we've hit on a couple of these things. We talked about the database. 310 00:28:14,430 --> 00:28:22,290 We've talked about some of the things in terms of also as items reach the end of their lives. 311 00:28:22,730 --> 00:28:32,030 Is there a language, a design language almost that starts to have the opportunity to emerge 312 00:28:32,030 --> 00:28:38,070 as things get replaced. Meaning, at points in time over the years, understandably, 313 00:28:38,410 --> 00:28:47,350 sometimes when something gets replaced at one park, if there is a useful life of something that's sort of, but it's reaching towards its end, 314 00:28:47,750 --> 00:28:53,050 it may have gone to a different park just to live out its glass in that space. 315 00:28:53,050 --> 00:28:57,570 right? Well, and from a standpoint of when it comes time to do some of those 316 00:28:57,570 --> 00:29:02,610 replacements, is it something where the design of the park is almost starting to 317 00:29:02,610 --> 00:29:07,590 emerge as something that is cohesive? What is the Mount Levenin characteristic of its 318 00:29:07,590 --> 00:29:12,650 parks? We'll take a very easy one, such as Ventures. There have been one park, 319 00:29:13,130 --> 00:29:19,050 there were three different styles of Ventures. Now, from a standpoint of why is it on efficiency, 320 00:29:19,050 --> 00:29:48,070 It's actually trying to look at almost the consideration for sometimes things can be evaluated and then purchased at a volume when they have a language to them rather than trying to seek something out that maybe a different style and then to get the next one in have we missed an opportunity or something like that so there is both an evaluation of design and then sort of the cost to some things. 321 00:29:48,070 --> 00:29:53,610 If there is the opportunity and being able to expand to a first 322 00:29:53,610 --> 00:29:59,030 of those, incorporate all of this data that does exist into 323 00:30:00,000 --> 00:30:29,940 Some elements of standards. Then that also has the ability at a deeper level than what you have presently. But from this accessible database, then being able to tie that to the operations, kind of, a routine, going out into the field and then identified, when is it time to do something? And having that database be a tool that really then becomes available to all of the crews that may be involved in that kind of 324 00:30:29,940 --> 00:30:36,360 And from a standpoint of public works, both Rudy and Phil, being able to communicate 325 00:30:36,360 --> 00:30:41,460 one another, I think that that is something that is a real gem, right, as we've witnessed 326 00:30:41,460 --> 00:30:48,440 throughout this process, and then being able to build in the next layer of knowledge for 327 00:30:48,440 --> 00:30:53,800 the other members of the crew so they have that ownership and being able to work within 328 00:30:53,800 --> 00:31:01,400 and that system I think is something that has some tools already in its box and then being 329 00:31:01,400 --> 00:31:07,800 able to adapt them specifically into the next level for person recreation. So this isn't going 330 00:31:07,800 --> 00:31:11,680 out and seeking something new. This is building upon some of the fact that you already have 331 00:31:11,680 --> 00:31:18,160 and you use in one way and then being able to expand it specifically into person recreation. 332 00:31:18,160 --> 00:31:26,400 A volunteer involvement, that is a critical element to the success of the system. 333 00:31:26,920 --> 00:31:33,540 And being able, then, again, both from a communication side and a call out almost right for 334 00:31:33,540 --> 00:31:39,600 understanding how those types of opportunities exist and how people can get involved, being 335 00:31:39,600 --> 00:31:45,980 able to look at that almost as an extension of the workflow, right, and the way in which 336 00:31:45,980 --> 00:31:49,540 and information is conveyed and collected and managed. 337 00:31:50,100 --> 00:31:55,160 Field usage and the data that has begun to be collected 338 00:31:55,160 --> 00:32:00,040 as part of 2021 efforts is something that we have the 339 00:32:00,040 --> 00:32:03,960 opportunity just to look at some basics and think about 340 00:32:03,960 --> 00:32:08,040 what are some other possibilities as the sports advisory board 341 00:32:08,040 --> 00:32:11,900 deals with that on a season by season type of basis 342 00:32:11,900 --> 00:32:26,620 So that you all can then as a municipality as a whole understand if there are trends that emerge from either a programming standpoint or from a participation standpoint if it's provided by others. 343 00:32:26,620 --> 00:32:39,100 where there start to be some ebbs and, you know, that flow there. And consider at any point in time, not just in 2022, but let's just say we're in 2030. 344 00:32:39,740 --> 00:32:50,100 Have participation rates for different types of opportunities increased at a rate that was sort of unexpected. 345 00:32:50,100 --> 00:32:53,180 Does that then entail the consideration 346 00:32:53,180 --> 00:32:55,140 for maybe a potential transformation 347 00:32:55,140 --> 00:32:59,360 of either program space or pickup kind of space? 348 00:32:59,980 --> 00:33:03,000 And so being able to have a little bit more figure 349 00:33:03,000 --> 00:33:06,300 on the pulse with that kind of data and understanding 350 00:33:06,300 --> 00:33:10,820 is gonna be truly helpful for actually the last one. 351 00:33:11,180 --> 00:33:12,100 And then we'll make sure. 352 00:33:12,720 --> 00:33:14,380 Second, I'll hit on connectivity. 353 00:33:14,920 --> 00:33:17,600 It gets at actually quite a number of things 354 00:33:17,600 --> 00:33:25,100 where people were thinking about how do we get to the parts and then being able to build 355 00:33:25,100 --> 00:33:32,620 almost on that language of what does it mean and being able to navigate getting to the parts. 356 00:33:32,960 --> 00:33:36,000 People who lived here for a very long time can do it probably. 357 00:33:37,620 --> 00:33:42,840 For close to it, right? And other people who may be new, do they know where everything is? 358 00:33:42,840 --> 00:33:57,560 do they have the ability to get to some of these places where there is universal accessibility on the main roots, being able to label areas where that may not exist so that there can be that accommodation. 359 00:33:58,180 --> 00:34:09,780 And then where it is also looking at the potential for expanding some formality associated with bikes because people bike sickle, as we can see, to the parks. 360 00:34:09,780 --> 00:34:22,240 And sometimes they're not using the racks and we had a very fun day when a group of barriers he has to use were just ready to throw the bikes on the lawn out by the parking lot because they were ready to play. 361 00:34:22,940 --> 00:34:33,940 But you know, and so thinking about how do you accommodate the different areas of interest and that then leads to the last one. 362 00:34:33,940 --> 00:34:43,520 Let's not face sort of what is the identity of the park system as it was evolved over time that language that graphic language a graphical sort of 363 00:34:43,740 --> 00:34:52,040 conveys of what is happening within the parks. What is happening within the neighborhoods and then directing people to the parks? 364 00:34:52,400 --> 00:34:57,660 What is happening on some of it within some of the rights of way where there are parks that are 365 00:34:59,380 --> 00:35:07,580 serving those well beyond who live here and being able to have people navigate to them with a sense 366 00:35:07,580 --> 00:35:14,680 of purpose and a sense of pride in the community. So being able to transform and build upon the language 367 00:35:14,680 --> 00:35:22,460 that you have at your gateways now with some of your signage and then being able to incorporate, I believe, 368 00:35:22,460 --> 00:35:40,220 actually the very specific set of the historic language that you have developed as a science system and then being able to make that we've been to how does that expand to adapt into the parking recreation system. 369 00:35:40,520 --> 00:35:47,980 So again, there are things well in play and well as the vocabularity of municipality and being able to tie them together. 370 00:35:49,520 --> 00:35:55,580 just to clarify for our large studio, I am swatching it home. The historic preservation board 371 00:35:55,580 --> 00:36:01,440 last year went through a process, had a consultant work with the board to develop historic district 372 00:36:01,440 --> 00:36:08,580 signage for the community and the recommendation here is to have take that signage type, the historic 373 00:36:08,580 --> 00:36:14,360 preservation board has already signed off on and sort of mirror it with the mark signage. So you have 374 00:36:14,360 --> 00:36:19,960 the design language, you have quite a number of all of those specifics are ready. 375 00:36:22,400 --> 00:36:28,920 Thank you. Thank you. Okay. So in the interest of time, I'm not going to go through every single 376 00:36:28,920 --> 00:36:33,800 of the 16 parks in the park specific recommendations, but if anyone has specific questions, 377 00:36:34,100 --> 00:36:38,240 um, the commission was probably with the four court, they're all in there or I can answer questions. 378 00:36:39,940 --> 00:36:45,700 So one of the items in the report is the, do we talk about this in previous discussions? 379 00:36:45,700 --> 00:36:51,540 session was kind of categorizing our 16 parks within broader definitions and being community 380 00:36:51,540 --> 00:36:55,320 parks, neighborhood parks, conservation natural areas, and especially facilities. 381 00:36:55,920 --> 00:37:03,220 And then, so as you can see, here's the list of how we categorize those parks within, you know, 382 00:37:03,340 --> 00:37:07,420 main park being our community park, Rafferton Country Club, Williamsburg, Rockswood, 383 00:37:07,540 --> 00:37:11,380 Highland Terrace, New York City, neighborhood parks, Bird Park, McKinley, Hoodridge, 384 00:37:11,380 --> 00:37:16,360 from college when hell is being a conservation natural areas and then the church place metaprofacial 385 00:37:16,360 --> 00:37:16,740 of course. 386 00:37:20,650 --> 00:37:26,050 So the idea of doing that then is that we can then define kind of what are the 387 00:37:26,050 --> 00:37:32,150 what are the assets we want to have in those parks and then when a new idea comes up for something 388 00:37:32,150 --> 00:37:34,680 if it's 389 00:37:37,720 --> 00:37:43,720 you know so what type of activity is that and then what type of park would that best fit in 390 00:37:43,720 --> 00:37:48,700 so that that kind of enables us to make those decisions of okay well maybe we don't want 391 00:37:48,700 --> 00:37:55,760 that in a conservation natural area maybe that's better fitted better suited in our community park or in our neighborhood park or something like that. 392 00:37:56,220 --> 00:37:59,540 And this also gets back to the definition of pick up first programming. 393 00:38:00,100 --> 00:38:05,860 If it's, you know, if you're going to have standardized pickle wall courts that have programming on the people are going to pay for. 394 00:38:06,200 --> 00:38:18,600 To use maybe the best places somewhere near or within the current tennis center footprint, or if you're just going to have kind of pick up areas maybe your neighborhood parks are better because the neighborhood parks tend to be more focused towards those pickup time activities. 395 00:38:18,600 --> 00:38:21,600 you know, where you have just kind of open basketball courts are open. 396 00:38:24,050 --> 00:38:30,750 This chart is kind of a useful guide, and it's reflected in the broader report too, for decision-making in the future. 397 00:38:33,160 --> 00:38:36,080 So, before we get into the recreation center, please, Billy, say it up. 398 00:38:36,340 --> 00:38:47,660 The other compliment to these categories is also thinking about from the practicality of maintenance. 399 00:38:47,660 --> 00:38:54,520 The maintenance standards is potentially associated with the community park compared to a neighborhood park. 400 00:38:54,860 --> 00:39:01,340 May have some variation that does not mean that they have, you know, enormous shifts in time. 401 00:39:01,840 --> 00:39:13,300 It's a matter of what is the level of maintenance and the frequency of that kind of maintenance that may happen in a conservation and natural area versus one that is in a neighborhood park. 402 00:39:13,300 --> 00:39:20,380 So there is some real internal possibility in thinking about sort of the system. 403 00:39:20,880 --> 00:39:24,040 This is where that blend of system-wide thinking and specific. 404 00:39:24,760 --> 00:39:24,800 Thank you. 405 00:39:25,220 --> 00:39:25,880 Thank you. 406 00:39:26,000 --> 00:39:26,660 Thank you. 407 00:39:27,040 --> 00:39:31,400 Commissioner Annie had asked about what were the specific recommendations for the golf course. 408 00:39:32,400 --> 00:39:36,620 And so I can just run through those establishing a formalized entrance, 409 00:39:36,620 --> 00:39:40,260 developing the forestry management plan and basic species plan for some of the 410 00:39:40,260 --> 00:39:44,980 wooded areas, enhanced signs and way-finding, improved pedestrian connections, 411 00:39:45,800 --> 00:39:49,800 especially with more accessibility towards the community garden plots, 412 00:39:50,180 --> 00:39:54,480 developing pedestrian connections and sidewalks, building an on-course 413 00:39:54,480 --> 00:39:58,880 restroom, constructing a centrally located pavilion, renovating the 414 00:39:58,880 --> 00:40:05,520 clubhouse, formalizing the ends with the community garden areas, addressing some 415 00:40:05,520 --> 00:40:07,420 some other improvements in the community gardens, 416 00:40:07,840 --> 00:40:09,580 consideration of fencing improvements 417 00:40:09,580 --> 00:40:10,600 in the community gardens. 418 00:40:11,060 --> 00:40:12,980 So those were broadly the Gold Court's recommendations. 419 00:40:13,620 --> 00:40:17,240 Spanning all of those previously identified categories 420 00:40:17,240 --> 00:40:18,660 that disabled mention. 421 00:40:19,500 --> 00:40:21,660 So within the report, you'll notice 422 00:40:24,400 --> 00:40:26,820 usually happens with my presentations 423 00:40:26,820 --> 00:40:30,060 and you need a great job of mirroring this 424 00:40:30,060 --> 00:40:33,280 that the symbology colors are consistent 425 00:40:33,280 --> 00:40:35,200 throughout the report that they aren't throughout our. 426 00:40:38,080 --> 00:40:42,780 So the, you know, symbolism that was used with the squares and the circles and the stars 427 00:40:42,780 --> 00:40:43,240 and trying 428 00:40:46,020 --> 00:40:47,040 to what things for. 429 00:40:48,630 --> 00:40:56,590 I think that is, while a very subtle formatting thing that it took some time, but actually 430 00:40:56,590 --> 00:41:03,110 the purpose of that is if there is a particular year where there is a focus with the commission 431 00:41:03,110 --> 00:41:08,850 that wants to have an emphasis, I'll just pick on identity, right? 432 00:41:08,850 --> 00:41:13,670 being able to navigate through this report, things are identified from that 433 00:41:13,670 --> 00:41:19,850 identity aspect, but they cross over into multiple facilities and or sort of 434 00:41:19,850 --> 00:41:26,230 that system-wide component. So there is an element and livability of this plan 435 00:41:26,230 --> 00:41:34,890 from both at the department level, from an official level and staff level that 436 00:41:34,890 --> 00:41:40,370 But you're all able now to sort of look at this as one type of language and be able 437 00:41:40,370 --> 00:41:40,730 to navigate. 438 00:41:41,110 --> 00:41:45,630 So, that's something we thought was important for the long-lasting, 439 00:41:48,340 --> 00:41:49,180 well-being on this evening 440 00:41:49,180 --> 00:41:50,260 next month. 441 00:41:52,160 --> 00:41:57,100 Moving to the Recreation Center of Feasibility Study portion of the report, Susie Fisher 442 00:41:57,100 --> 00:42:03,460 from the Sports Facilities Advisory Group is also on the call and she will be handling most 443 00:42:03,460 --> 00:42:05,280 of this with this angle, so I'll hand it off to them. 444 00:42:05,900 --> 00:42:06,620 Thank you so much. 445 00:42:06,620 --> 00:42:12,340 Susie, I'll just do an introduction and then we're going to be able to get into the different 446 00:42:12,340 --> 00:42:20,000 components of the analysis and we'll spend maybe about 10 minutes or so and then Ian, 447 00:42:20,140 --> 00:42:23,220 you've got some other thoughts and then you back into some things. 448 00:42:23,660 --> 00:42:32,960 So what we have had the opportunity to do is think about sort of what this analysis has 449 00:42:32,960 --> 00:42:40,020 of consideration both within the municipality and the broader region because ultimately when it 450 00:42:40,020 --> 00:42:47,940 comes to a next level discussion about what the opportunities are or what the goals to whom 451 00:42:48,680 --> 00:42:55,600 the services and the facilities are being provided the kinds of benefits that you would be 452 00:42:55,600 --> 00:43:00,300 up wanting to offer those participants mean in terms of how they're fulfilled through recreation 453 00:43:00,300 --> 00:43:11,860 and as an expansion, again, of generally the water-oriented both frozen and the frozen elements that you have at the current Recreation Center for some of the supporting spaces. 454 00:43:12,500 --> 00:43:28,500 This is borne from technical analysis that is looking at data throughout the region and then that the melting of what we heard as part of those 3000 plus participants of this process 455 00:43:28,500 --> 00:43:31,180 and some of the considerations that they brought to the table. 456 00:43:31,640 --> 00:43:34,300 So, are you able to dive in now? 457 00:43:34,640 --> 00:43:36,380 I am, and I do apologize. 458 00:43:36,640 --> 00:43:40,540 I have an unstable connection where I am, so my video may go in and out. 459 00:43:40,840 --> 00:43:45,120 But just the slide that we're on, so we actually work on what's called a funnel model. 460 00:43:45,740 --> 00:43:50,140 We start with the definitions of success or the objectives for the project, 461 00:43:50,680 --> 00:43:54,020 dig down deep into the data, the demographics and socioeconomics, 462 00:43:54,260 --> 00:43:57,060 then the participation trends for particular sports. 463 00:43:57,060 --> 00:44:08,680 Finally, the regional competition and what that looks like at regional events to lead into the recommendations for the Recreation Center in the various locations that we did make those recommendations for. 464 00:44:09,320 --> 00:44:20,360 So really a database model that incorporates the survey recommendations, the recommendations from everyone in the group to really get you some recommendations, final recommendations. 465 00:44:20,360 --> 00:44:31,580 So what were those definitions of success or objectives first and foremost to develop a first class sports recreation and fitness facility that offers programs that contribute to enhance and directly impact. 466 00:44:31,940 --> 00:44:43,620 The physical socio emotional and development of the citizens of Mount Lebanon and the surrounding areas second to feature diverse and flexible programming spaces and capabilities sports. 467 00:44:43,620 --> 00:44:49,360 its community center at civic activities, school activities that would serve the widest variety 468 00:44:49,360 --> 00:44:55,260 of partners and stakeholders. And finally, how do you improve access and connectivity 469 00:44:55,260 --> 00:44:59,980 to premium fitness and local recreation spaces to meet the demand? But also in 470 00:45:00,000 --> 00:45:11,000 This is a enhanced liquidity of life provides for-a-tacess where they may not currently exist or they're limited. So those are the items that we looked at as we dove into the feasibility for the Recreation Center. 471 00:45:18,540 --> 00:45:32,620 If we can jump to demographics, okay. So we start with demographics. This is actually just a center, pin point in Mount Lebanon. We look at 10, 15, 30, 60, 90, and 240. We don't look at mileage, we look at actual drive times. 472 00:45:32,620 --> 00:45:58,320 So the population range anywhere from 114,000 up to 18 million, you say why on earth are we looking at 240 so for regional tournaments, the 90 and 240 minute is the timeframe that we consider tournament providers to seek participants from that actually helps with your overnight travel and your heads and beds. 473 00:45:58,320 --> 00:46:01,840 Next, we looked at growth projections and then median age. 474 00:46:02,240 --> 00:46:08,240 So the US median age is 38.5 within your center, 10 minutes, your local population or your 475 00:46:08,240 --> 00:46:15,900 local users, 10, 15, 30 minutes, 47 to 42, and then your population again, the 60, 90 476 00:46:15,900 --> 00:46:16,680 goes out. 477 00:46:16,820 --> 00:46:22,180 So your population is slightly older than what the regional or the US median average is. 478 00:46:23,400 --> 00:46:26,120 Older population typically means older participants. 479 00:46:26,120 --> 00:46:38,800 younger population when you get closer to that 38.5 typically means more children and more participants. Your household median income well above what the US median is at 67,521. 480 00:46:39,360 --> 00:46:40,620 We do adjust that. 481 00:46:41,260 --> 00:46:46,400 The last category we look at really is like a disposable income, but it is specific to recreation spending. 482 00:46:46,400 --> 00:47:04,460 So this is the amount that individuals in your region are willing to spend to learn and participate in an introductory level sport, whether that's lessons, a learn to play program or even just individual training to acquire the skills to play a program. 483 00:47:04,900 --> 00:47:11,960 So these are the demographics for your region that we look at and when we plan the recreation center and did the feasibility for that. 484 00:47:11,960 --> 00:47:20,640 The programs really are correlated to the population and also to coordinate with what was requested from your community. 485 00:47:22,560 --> 00:47:30,740 What's the immediate, what's the US average for the income of adjusted costs or just the, you know, 21%. 486 00:47:30,740 --> 00:47:38,040 So the US median household income is that 67 so we adjust that you are 21% your 10-minute 487 00:47:38,040 --> 00:47:44,180 is 21% over what the US median household income is so you're well above the household 488 00:47:44,180 --> 00:47:45,620 US household median income. 489 00:47:47,020 --> 00:47:53,500 Yes, so then we look at what potential participants may be within your market and so this is actually 490 00:47:53,500 --> 00:47:58,060 derived from the National Sporting of Association and Sports Fitness Association. 491 00:47:58,060 --> 00:48:11,120 It takes into consideration purchases whether it's lead related or fitness equipment related to determine what sports individuals are actually participating in on a regular basis. 492 00:48:11,500 --> 00:48:19,140 So the individual who buys one basketball, not necessarily considered in this, but an individual who buys multiple tennis balls. 493 00:48:19,140 --> 00:48:46,100 it's really a survey type. So soccer, basketball, baseball, volleyball, softball, gymnastics, you can see those participation rates. The highest is basketball 6.08% within your local market, your 10 minute market, about 7,000 potential participants in just basketball 15 minutes up to 14,000 almost double within that 30 minute, 53 potential, 1000 participants to take place with basketball. 494 00:48:46,100 --> 00:48:52,060 So core-based higher than some of your outdoor, your turf-based sport, soccer-based 495 00:48:52,060 --> 00:48:58,760 well, but basketball and volleyball key to look at with core-based sports and what that potential is. 496 00:48:59,060 --> 00:49:04,160 It's important to think when you think potential participants for year-round sports versus seasonal sports. 497 00:49:04,700 --> 00:49:08,860 And so basketball is one of those sports that can take place 12 months out of the year. 498 00:49:11,890 --> 00:49:15,370 And so the key insights if we can jump to that one. 499 00:49:18,250 --> 00:49:27,190 Perfect. Okay. So your socioeconomic factors in the sub-regional and local market are 500 00:49:27,190 --> 00:49:31,910 very positive for the development and operation of a new tournament class sports facility. 501 00:49:32,570 --> 00:49:37,750 The opportunity to create that local sports and events program, they increase with the asset types, 502 00:49:37,870 --> 00:49:45,250 they can accommodate the variety of activities. So a very diverse, very flexible space definitely increases 503 00:49:45,250 --> 00:49:51,690 is the opportunity. The most successful facilities have to drive that tourism, they have 504 00:49:51,690 --> 00:49:56,730 to drive the participants for your local group. It has to be an excellent mix, but it has 505 00:49:56,730 --> 00:50:01,090 to be something that differentiates themselves. So as we look at the facilities, you'll see we 506 00:50:01,090 --> 00:50:06,190 added elements that would differentiate each one of them from each other and from things in your 507 00:50:06,190 --> 00:50:12,010 local market that discurrently don't exist. And then again indoor spaces, you're in a winter-based 508 00:50:12,010 --> 00:50:18,510 to market. You have limited season, so a sports-based facility that's indoor creates the greatest potential 509 00:50:18,510 --> 00:50:24,210 to accommodate the most number of participants year-round. Climate is a challenge with you, 510 00:50:24,290 --> 00:50:27,890 and so I would consider that as an essential item for an indoor facility. 511 00:50:30,620 --> 00:50:32,380 And so if we can go to 512 00:50:32,380 --> 00:50:39,910 the next slide, it really just gives you an indicator of what your local providers are and where they're 513 00:50:39,910 --> 00:50:41,610 located within your region. 514 00:50:44,180 --> 00:50:49,620 So there are 100 plus facilities within the local. So that's within 515 00:50:49,620 --> 00:50:56,820 that 30, 10, 15, 30, 60 minute market. That's everything from indoor court facilities to sports 516 00:50:56,820 --> 00:51:03,280 performance, rock climbing, turf and fitness. Just to give you an idea of where those are. We did 517 00:51:03,280 --> 00:51:05,500 provide a full list of those. 518 00:51:07,940 --> 00:51:08,560 Interestingly, 519 00:51:12,720 --> 00:51:15,560 there really aren't any rock climbing. I noticed that 520 00:51:15,560 --> 00:51:16,740 there weren't really any rock climbing, 521 00:51:20,450 --> 00:51:21,870 no more than when I was kind of doing it. 522 00:51:21,870 --> 00:51:23,350 I think you're free on the sales side now. 523 00:51:23,610 --> 00:51:27,050 Are there, the same is there, and I know there's no more going on. 524 00:51:27,530 --> 00:51:29,730 So, there's more more in the sales side. 525 00:51:29,970 --> 00:51:31,910 Yeah, but I don't think we crossed the road. 526 00:51:33,190 --> 00:51:33,370 So, yeah. 527 00:51:34,010 --> 00:51:35,030 So, you go through it. 528 00:51:35,030 --> 00:51:35,810 You're so good through it. 529 00:51:35,910 --> 00:51:36,170 Yeah. 530 00:51:37,230 --> 00:51:37,410 Yeah. 531 00:51:37,650 --> 00:51:39,970 I was aware that there was a couple of cases that I saw 532 00:51:42,690 --> 00:51:43,890 for 533 00:51:46,550 --> 00:51:47,010 consideration. 534 00:51:47,350 --> 00:51:50,970 This is a chart that we talked about a bit last time as well when we presented the commission 535 00:51:50,970 --> 00:51:54,310 that as part of the RFP for this project, 536 00:51:54,570 --> 00:51:57,350 and why we combined the two projects together was 537 00:51:57,800 --> 00:51:59,810 that we were doing a parks master plan 538 00:52:00,330 --> 00:52:03,150 and recreations or feeds directly into that, 539 00:52:03,230 --> 00:52:05,770 plus any potential recreation facility 540 00:52:05,770 --> 00:52:09,230 is most likely going to be located in one of our parks 541 00:52:09,230 --> 00:52:11,490 or be creating a new recreation area, 542 00:52:11,490 --> 00:52:14,290 which would then essentially function similar to a park. 543 00:52:15,470 --> 00:52:19,930 So part of the RFP was to define three potential locations 544 00:52:19,930 --> 00:52:26,970 to analyze them. And we came as we started analyzing three locations, we kind of honed in on the 545 00:52:26,970 --> 00:52:33,510 main park area, the uptown business district area and the McNeely park. And the thing I'll note is 546 00:52:33,510 --> 00:52:39,670 that at least for uptown and McNeely park, McNeely would be essentially a completely green field 547 00:52:39,670 --> 00:52:40,590 development that they're 548 00:52:43,240 --> 00:52:48,240 in space. And it's just, you know, McNeely's kind of a choose your 549 00:52:48,240 --> 00:52:50,120 or an adventure park at this point in time, 550 00:52:50,120 --> 00:52:54,140 and that is, I would hesitate to even call it forested, 551 00:52:54,200 --> 00:52:58,400 it's more overgrown, but it's, yes, yes. 552 00:52:59,080 --> 00:53:01,000 So there's a lot of opportunity there. 553 00:53:06,380 --> 00:53:08,760 The trade-offs with, nearly, can also be considered 554 00:53:08,760 --> 00:53:11,840 as trade-offs for any other kind of potential locations 555 00:53:11,840 --> 00:53:13,440 where we would be building on land, 556 00:53:15,610 --> 00:53:19,590 whether that would be another land that's owned by the municipality 557 00:53:19,990 --> 00:53:22,430 or purchased by the municipality or something else, 558 00:53:22,430 --> 00:53:37,430 You know, further down the line, the McNeely Greenfield trade-offs can also be viewed as sort of that open-ended, you know, if we acquired some other piece of land in the community to build on the same trade-offs would exist for that piece of land. 559 00:53:37,430 --> 00:53:46,630 Uptown, essentially located or redeveloped an area, you know, you can kind of use those same ideas for any other piece of land, maybe not necessarily. 560 00:53:47,150 --> 00:53:56,830 Hey, it's built something on top of the south garage, that was something we talked about, but also, you know, if there was any other pieces of land that became available in or near uptown, you could use these same ideas. 561 00:53:57,390 --> 00:54:03,330 So while they have these three labels, you know, the ideas stay the same regardless of the exact site location. 562 00:54:03,330 --> 00:54:07,030 So these are some of the trade-offs that have to be considered. 563 00:54:07,590 --> 00:54:10,050 There is no perfect site in 564 00:54:14,300 --> 00:54:18,960 having a tighter ability to install new parking like main 565 00:54:18,960 --> 00:54:25,700 park has versus potentially in topography with main park to park view and uptown to park 566 00:54:25,700 --> 00:54:31,900 with McNeely, the amount of earthwork that might be needed, the access to public transit, 567 00:54:31,900 --> 00:54:37,720 the access via, you know, walking or biking things like that, just the proximity to our population 568 00:54:37,720 --> 00:54:42,340 centers. How can you get there? You know, maybe parking up town are both pretty walkable for those 569 00:54:42,340 --> 00:54:46,540 the community versus the elite where kind of like the golf course, you have to leave Mt. Lebanon 570 00:54:46,540 --> 00:54:50,940 today, come back into Mt. Lebanon to get there. So, I'm not as accessible. 571 00:54:55,960 --> 00:55:01,200 Not to go too far back in the evening, but when we consider what those system-wide 572 00:55:01,200 --> 00:55:08,160 recommendations are related to connectivity and identity, depending upon where site may have 573 00:55:09,080 --> 00:55:14,040 arise to the top, the way in which, again, people are oriented to that site, 574 00:55:14,360 --> 00:55:19,800 and it is by vehicle, or if it is by foot, right, and holding that into itself. 575 00:55:21,790 --> 00:55:30,840 So we do have the full plan itself contains multiple kind of clock each site. 576 00:55:31,760 --> 00:55:37,540 for tonight's presentation, I chose just one, we chose just one of each, it wasn't just my report, it's all of our reports. 577 00:55:37,900 --> 00:55:42,560 It's a team effort, but we chose just one of each to kind of talk about it at some of the trade-offs there at. 578 00:55:43,200 --> 00:55:46,420 So, I will turn it back over to, let's see what kind of talk about some of those. 579 00:55:46,620 --> 00:55:58,780 Thank you. And Susie, as we go through each of these, we have that spread right of some of the costs compared to these are relative numbers to try and understand. 580 00:55:58,780 --> 00:56:04,540 And again, Zian Newworth's identifying different types of situations and trade-offs that could 581 00:56:04,540 --> 00:56:05,540 be realized. 582 00:56:06,120 --> 00:56:13,740 So as the exploration of these occurred throughout the last several months, and the highlight 583 00:56:13,740 --> 00:56:19,560 of one of several of the different options for each year, the consideration for main part 584 00:56:19,560 --> 00:56:25,040 had to focus at this juncture of thinking about a second story. 585 00:56:25,040 --> 00:56:46,920 Now, from an architectural element that could mean different things, right, in terms of the walls themselves that they would have that capacity to host that structure, or if it were almost done as almost a second building that was encapsulating the existing one and how the spaces in and around that would be utilized. 586 00:56:46,920 --> 00:56:56,180 The elements of connection are significant, no matter what is ultimately selected if main park were to be pursued. 587 00:56:56,560 --> 00:57:07,880 And by that is an item of how does the full space that exists have some incorporation potentially into an expanded structure if that were the case. 588 00:57:07,880 --> 00:57:15,580 how is the for court, I'll call it, meaning the transition between the where 589 00:57:15,580 --> 00:57:20,780 someone parks and the main entrance of the building organized. How are public 590 00:57:20,780 --> 00:57:26,080 spaces incorporated? It is not just a set of walls inside that can be used for 591 00:57:26,080 --> 00:57:31,000 flexible spaces. It is looking at sort of this as a whole and the considerations for 592 00:57:31,000 --> 00:57:40,720 that. The clue in there you did a minute ago about parking is we'll have one of the greatest 593 00:57:40,720 --> 00:57:48,420 impacts in pursuing main park. The way in which parking is configured and the possibilities 594 00:57:48,420 --> 00:57:57,380 of that being a structured element is something that would need to be on the list of that, that 595 00:57:57,380 --> 00:58:04,640 says specific things based upon things that we have heard over time about some of the important 596 00:58:04,640 --> 00:58:14,160 spaces that are adjacent to existing residential areas that are on the park's perimeter. 597 00:58:14,660 --> 00:58:21,640 The way in which some of that pavilion space and play space that is offered out to residents, 598 00:58:22,060 --> 00:58:27,000 what would that convene in another option? There was a different building configuration that had 599 00:58:27,000 --> 00:58:35,120 a different impact, right, on the green spaces. But at the same time, if surface parking 600 00:58:35,920 --> 00:58:46,540 is pursued at this type of view, then that entails field's work of space, just as that general 601 00:58:46,540 --> 00:58:52,500 relative relationship. So for the purpose of this, we looked at this. So let's go to the 602 00:58:52,500 --> 00:58:55,440 So Susie, if this will come up for you in a minute, 603 00:58:55,840 --> 00:58:59,420 and you can follow along right from your under-aspects. 604 00:58:59,520 --> 00:59:01,400 I just have one quick question for you to the number. 605 00:59:01,700 --> 00:59:03,220 So just go back one more slide. 606 00:59:04,040 --> 00:59:06,800 So where we have the structured parking to know it there 607 00:59:08,140 --> 00:59:14,050 is that like, do we have engineers look at that? 608 00:59:14,750 --> 00:59:17,450 It's okay, so it's just like put a box in a dollar, 609 00:59:17,710 --> 00:59:19,590 a flip for a parking, and that's the number. 610 00:59:20,170 --> 00:59:21,330 We're trying to size. 611 00:59:21,330 --> 00:59:32,490 Yes. The scale of the number of spaces and a general relationship of where on the site, 612 00:59:33,270 --> 00:59:39,730 it could fit meaning between a roadway and a building. The exact dimensions of this need to be 613 00:59:39,730 --> 00:59:44,570 that relative. And then on that slide, I think would remain learnedly. 614 00:59:45,770 --> 00:59:51,930 That's on this option and all of the options explored is part of that conceptualizing phase. 615 00:59:52,750 --> 00:59:55,490 The existing structure is intact. 616 00:59:55,510 --> 00:59:59,970 It's a matter of how any additional or enhancement of the... 617 01:00:00,000 --> 01:00:29,320 So the structure could be either folded in or incorporated into the site. Thanks, thanks. So Z. Yes. So looking at main part, in our facility programming model. So main part we considered both a local and a sub local area that would draw people in. To your location. So the recommendation would be for four basketball courts. Those could be cross lined into eight ball are eight pickle ball or eight volleyball. 618 01:00:29,320 --> 01:00:33,240 could be 12 pickable, depending on how that actual layout works. 619 01:00:33,680 --> 01:00:37,000 Mezzanine walking track, a membership-based fitness area, 620 01:00:37,180 --> 01:00:38,680 cardio and strength equipment in it, 621 01:00:38,740 --> 01:00:42,380 and training area, small and large exercise rooms, 622 01:00:42,440 --> 01:00:44,980 as well as child watch, an adventure area. 623 01:00:45,360 --> 01:00:47,720 This is the key differentiator for this facility 624 01:00:47,720 --> 01:00:50,500 would be an esports area, not necessarily an arena, 625 01:00:50,780 --> 01:00:52,820 but a membership esports-based area. 626 01:00:53,260 --> 01:00:55,340 And then a play structure climbing area, 627 01:00:55,580 --> 01:00:58,360 climbing wall adventure type element 628 01:00:58,360 --> 01:01:04,500 within the facility and then finally some classroom space. I know we saw a lot of those responses 629 01:01:04,500 --> 01:01:09,440 for classroom space and for education space. A cafe and kitchen area, not your general 630 01:01:09,440 --> 01:01:15,160 concession, but a health-based type cafe and kitchen area. Based on this and the square footage 631 01:01:15,160 --> 01:01:22,100 that it would take, roughly about $47 million. So we actually did the business unit analysis for 632 01:01:22,100 --> 01:01:35,480 for each of these, everything from local leagues, tournaments and events to special events looking at a it's even it's not something that you typically look at, but it's your earnings before tax income and depreciation. 633 01:01:36,840 --> 01:01:47,720 Positive cash flow is what we typically call it for people, so somewhere in the first year of about a $300,000 subsidy in year five actually on in the positive without a subsidy. 634 01:01:47,720 --> 01:01:55,220 at about $94,000. This, because it can host tournaments, local tournaments with the four 635 01:01:55,220 --> 01:02:01,960 courts, does have an economic impact that's fairly significant. About $4,500 room nights 636 01:02:01,960 --> 01:02:08,460 in year one with a $1.5 million estimate on economic impact to your local community, up 637 01:02:08,460 --> 01:02:16,540 to just over $2 million in year five with about $15,000, sorry, $5,200 room nights that could 638 01:02:16,540 --> 01:02:19,660 would be utilized through tournaments and events 639 01:02:20,020 --> 01:02:21,940 at the main park facility. 640 01:02:23,340 --> 01:02:27,640 Where's the cost associated with the $50 million bond issue? 641 01:02:32,820 --> 01:02:34,320 I'm sorry, again, I'm sorry. 642 01:02:35,480 --> 01:02:40,480 Where's the $50 million bond issue cost baked into that? 643 01:02:43,010 --> 01:02:46,210 So I'm not, do you currently, I'm not understanding 644 01:02:46,210 --> 01:02:47,230 your question, I'm sorry. 645 01:02:47,490 --> 01:02:50,350 I have the background for the estimates, 646 01:02:50,350 --> 01:02:55,610 everything from the hard shell cost through development for the estimate. 647 01:02:56,790 --> 01:03:06,430 I want to return. I need to know how much it also cost me to pay for the infrastructure that I just built the cost being $47 million. 648 01:03:07,230 --> 01:03:08,470 Yes, so this is not. 649 01:03:08,470 --> 01:03:22,470 Yeah, this does not consider any type of debt service I can provide that debt service with any type of breakdown in a 20 30 year term as well so you can see that debt service and what that payment would look like. 650 01:03:23,210 --> 01:03:23,410 Right. 651 01:03:23,570 --> 01:03:35,250 Well, so the EBITDA is off because it is only operating expenses, so it's only revenue and expenses cost of goods sold. 652 01:03:35,250 --> 01:03:37,610 it does not include any type of debt service. 653 01:03:38,210 --> 01:03:38,770 All right, very now. 654 01:03:39,050 --> 01:03:43,910 Okay, next thing, we have one hotel. 655 01:03:46,650 --> 01:03:48,350 So far, are we building another hotel? 656 01:03:52,690 --> 01:03:54,630 No, it's not revenue to us. 657 01:03:54,670 --> 01:03:55,850 That's revenue to other communities. 658 01:03:56,210 --> 01:04:01,210 It is revenue to other communities, but those same individuals would then utilize restaurants 659 01:04:01,210 --> 01:04:05,290 within your community, local convenience stores, gas stations. 660 01:04:05,290 --> 01:04:09,090 and so it is possible that you would see some of that, 661 01:04:09,190 --> 01:04:10,730 but you would not see the room that revenue, 662 01:04:10,730 --> 01:04:11,430 you are correct. 663 01:04:12,450 --> 01:04:15,210 Okay, so that, yeah, I think we could take that one off 664 01:04:15,210 --> 01:04:17,610 of our analysis, but this is my general question, 665 01:04:17,630 --> 01:04:20,770 everybody, do we want more traffic, get up home? 666 01:04:22,110 --> 01:04:23,090 This is a main point. 667 01:04:23,250 --> 01:04:24,150 No, I'm very interested. 668 01:04:24,770 --> 01:04:27,190 This is traffic everywhere coming into our community. 669 01:04:27,750 --> 01:04:29,630 So for the tournament to talk about, 670 01:04:29,770 --> 01:04:33,050 we want to be a regional center for turning. 671 01:04:33,170 --> 01:04:34,210 We want to be a regional center, 672 01:04:34,210 --> 01:04:40,390 recognizing that we don't have good access. Where Pittsburgh has good access, 79 has good access. 673 01:04:40,610 --> 01:04:44,730 We want people on surface streets coming into our town to a tournament level. 674 01:04:45,590 --> 01:04:50,830 Well, that's a real question. I think that we talk about then uptown because I think the 675 01:04:50,830 --> 01:04:59,950 consideration, Susie, also the programming for a facility that is not having that same reach 676 01:04:59,950 --> 01:05:03,070 is something more akin to what was explored in uptown. 677 01:05:03,610 --> 01:05:06,170 So it's meaning the scale of the facility 678 01:05:06,170 --> 01:05:08,330 if there were that type of interest 679 01:05:08,770 --> 01:05:12,930 that could be then adjusted to one of the other sites. 680 01:05:13,530 --> 01:05:16,390 Well, again, for me it's, I think at its core, 681 01:05:16,570 --> 01:05:19,150 I'm just, I'm kind of surprised that we're looking 682 01:05:19,150 --> 01:05:21,170 at tournament level facilities, 683 01:05:21,910 --> 01:05:25,950 given the nature of our footprint as a community. 684 01:05:26,470 --> 01:05:27,710 I think it's a valid question. 685 01:05:28,070 --> 01:05:29,170 I'm not a yes or no, 686 01:05:29,170 --> 01:05:37,010 but I think it's important to be very clear what we want that to come in now and so it's not 687 01:05:37,010 --> 01:05:43,430 location for me it's scale and kind of concept. Are we serving our community or are we trying to 688 01:05:43,430 --> 01:05:48,770 be a regional destination? So let's talk about the four basketball courts or first is the A basketball 689 01:05:48,770 --> 01:05:53,850 courts. I'm hearing that basketball is a huge demand not immediately locally and then within that 690 01:05:53,850 --> 01:06:00,750 15-minute drive. So, Dormant, yes, you know, Castle Shannon, yes, we could probably write it out to 691 01:06:00,750 --> 01:06:06,410 those leagues as well as serve our own elements. Instead of the big tournaments, it could be a local 692 01:06:06,410 --> 01:06:12,350 draw as also which is different sorts of revenue. It's written. People go to say Claire, 693 01:06:13,070 --> 01:06:19,290 right? We all have kids, we go, we go, we go to these things, right? Right? But there's a certain 694 01:06:19,290 --> 01:06:21,970 scale you achieve when you become the turn of the destination. 695 01:06:22,610 --> 01:06:22,930 Yeah. 696 01:06:23,330 --> 01:06:27,250 I mean, when the guy came in and pitched pickle ball, he was talking about that, putting 697 01:06:27,810 --> 01:06:33,110 in certain reports and running tournaments and even some of the pictures that he put 698 01:06:33,110 --> 01:06:35,010 up were place in Florida. 699 01:06:35,270 --> 01:06:38,870 I can't remember there was another place in Arizona, someplace, but it was like a massive 700 01:06:38,870 --> 01:06:39,710 amount of people. 701 01:06:40,110 --> 01:06:43,410 That was part of the pitch when we were talking about costs for that too. 702 01:06:43,770 --> 01:06:45,010 You didn't take the tournament so much. 703 01:06:45,010 --> 01:06:49,150 Okay, I'm not saying this, but of course, you're off course, but 704 01:06:49,990 --> 01:06:55,870 I have what some of these facilities that are funded by taxpayer dollars, don't expect 705 01:06:55,870 --> 01:06:56,630 to return money. 706 01:06:57,190 --> 01:06:57,670 Don't. 707 01:06:57,770 --> 01:06:57,990 Sure. 708 01:06:58,410 --> 01:07:02,830 So, if you want to build it, don't think of it as we're going to go get rich off of this 709 01:07:02,830 --> 01:07:04,490 and generate initial tax dollars. 710 01:07:05,230 --> 01:07:10,310 It's got to be an amenity that you really want, and that's got to justify it. 711 01:07:10,590 --> 01:07:10,850 Hands down. 712 01:07:11,710 --> 01:07:12,030 Thank you. 713 01:07:12,030 --> 01:07:18,610 Yeah, I think there's community impact or she's got, yeah, community impact economic, I would say that that stuff is green. 714 01:07:19,630 --> 01:07:22,510 You know what I mean? If it feels a lot of, right? Yeah. 715 01:07:23,310 --> 01:07:24,190 I agree with that. 716 01:07:24,530 --> 01:07:30,110 What I want to say, like, don't do something just because we don't want one more. 717 01:07:37,340 --> 01:07:41,540 So I will say that we were very intentional in calling this a feasibility study. 718 01:07:41,540 --> 01:07:45,160 kind of look as the first question of is it feasible. 719 01:07:46,320 --> 01:07:52,180 And the RFP specifically asked for three locations to kind of analyze those of what we could do potentially. 720 01:07:52,740 --> 01:08:10,000 And I think kind of the idea of a tournament class facility came out of some of that demographic research that Susie talked about beginning that there is a large market in a drivable range of us that has disposable income to spend on sports things. 721 01:08:10,000 --> 01:08:22,340 So, you know, if those demographics, sites, you come back differently, then, you know, the recommendations from SFA may have come back a little bit differently. But not to get too far ahead of myself in the interest of time to go in 20 minutes let discussion session. 722 01:08:23,220 --> 01:08:30,340 That one of the next steps is sort of determining where we want to go on the recreation center piece of this. 723 01:08:30,340 --> 01:08:35,600 if we want to do further exploration, further get into like we didn't do any kind of architectural 724 01:08:35,600 --> 01:08:39,020 renderings, we didn't do any kind of floor planting, anything like that as part of this. This 725 01:08:39,020 --> 01:08:44,400 was purely a, is it feasible? It's not. And how much, yeah, probably. So the next step, which 726 01:08:44,400 --> 01:08:48,620 like I said, not too far, I haven't helped it. The next step on the recreation piece is really 727 01:08:48,620 --> 01:08:53,500 for the commission to say, you know, yes, we want to continue exploring this, or say, you know, 728 01:08:53,700 --> 01:08:58,120 thank you, this is great research. We'll potentially consider it the future, but we're not, 729 01:08:58,120 --> 01:09:07,340 We're going to move forward with kind of all the other 180 recommendations of the plan first before we really put our boots to the ground on the right side of the piece. 730 01:09:08,040 --> 01:09:16,900 So that's kind of a future conversation for the commission to have, you know, potentially with input from the sports advisory board and some other community members if you want to happen. 731 01:09:17,080 --> 01:09:21,020 But as far as tonight's presentation goes, this is kind of on the feasibility piece. 732 01:09:21,020 --> 01:09:26,180 I don't know that I would be ready to make that kind of decision now, I think Andrew brings 733 01:09:26,180 --> 01:09:32,140 up some good points about the cost because we're going to need that, or at least a summary 734 01:09:32,140 --> 01:09:36,740 of that number, to understand if we either want to be forward, because if we're going to 735 01:09:36,740 --> 01:09:41,520 be operating this at a loss, even a small one, we have to figure out a way to even fund 736 01:09:41,520 --> 01:09:45,220 that, which would mean tax increases or some other funding. 737 01:09:45,220 --> 01:09:49,440 And if we could be talking about a huge difference here. 738 01:09:50,580 --> 01:09:52,740 So I think we would need a little bit more detail 739 01:09:52,740 --> 01:09:54,280 just with the numbers to determine. 740 01:09:55,460 --> 01:09:57,360 When we have the ability of feasibility. 741 01:09:57,740 --> 01:09:59,480 And part of, I mean, they provided full, 742 01:09:59,780 --> 01:10:01,960 pro-former reports on all of these 743 01:10:01,960 --> 01:10:03,620 that I haven't can share with people, 744 01:10:03,660 --> 01:10:04,800 really want to look through all that. 745 01:10:05,520 --> 01:10:06,880 And you know, Andrew McCurrier, 746 01:10:07,020 --> 01:10:10,350 my instructor before Monday, 747 01:10:10,790 --> 01:10:11,890 you know, we're involved with their iteration. 748 01:10:11,890 --> 01:10:13,830 So he has some background in how they put their stuff 749 01:10:13,830 --> 01:10:15,730 together right now from talking with him 750 01:10:17,030 --> 01:10:27,990 when they built their facility, they essentially, like Commissioner Flynn said, the capital cost of facility construction was basically kind of considered the investment. 751 01:10:28,490 --> 01:10:34,810 And then their facility revenue is just based on offsetting the operating cost of facility. 752 01:10:34,930 --> 01:10:38,710 So their facility is not set up to recoup any of that bond investment. 753 01:10:38,710 --> 01:10:41,750 My money is set up to recruit the cost of operation. 754 01:10:41,890 --> 01:10:45,650 And that goes into us selling the idea of extra services 755 01:10:45,650 --> 01:10:49,870 that are presented as we want these things 756 01:10:49,870 --> 01:10:51,270 from surveys and things like that. 757 01:10:51,390 --> 01:10:52,650 And then the cost associated with that, 758 01:10:52,690 --> 01:10:55,550 whatever they are, that would be a project in and of itself. 759 01:10:56,070 --> 01:10:58,470 So that's kind of one of the kind of decisions 760 01:10:58,470 --> 01:11:00,310 for the commission coming out of this is, 761 01:11:00,550 --> 01:11:02,250 do we want to continue down that path? 762 01:11:02,430 --> 01:11:05,030 Or do we want to focus on the other recommendations first 763 01:11:05,030 --> 01:11:06,210 or how do we want to handle this? 764 01:11:06,210 --> 01:11:09,430 Would you say that the recommendation is any non-req-centre recommendation? 765 01:11:10,970 --> 01:11:14,830 So that's a further discussion that doesn't have to be decided tonight. 766 01:11:14,950 --> 01:11:15,690 Yeah, I think we do. 767 01:11:15,830 --> 01:11:20,250 Just because like the way that's presented here is like, hey, this is a whole bunch of stuff. 768 01:11:20,370 --> 01:11:21,050 And we all have info. 769 01:11:21,330 --> 01:11:22,470 Should we keep looking at it or not? 770 01:11:22,690 --> 01:11:24,450 I think we should look at it in a different way. 771 01:11:25,270 --> 01:11:25,910 At a different time. 772 01:11:26,270 --> 01:11:27,710 I'd like information on. 773 01:11:29,510 --> 01:11:30,390 What's the trends? 774 01:11:31,250 --> 01:11:34,790 You know, how much do people really want to exercise in the side? 775 01:11:34,790 --> 01:11:36,950 or how much do they really want to spend time outside? 776 01:11:37,850 --> 01:11:39,950 That's had some information I think would be helpful to me 777 01:11:39,950 --> 01:11:45,130 because my own personal view is that I don't want 778 01:11:45,130 --> 01:11:47,490 to exercise inside of the outside. 779 01:11:47,690 --> 01:11:48,950 I'd rather have my kids outside. 780 01:11:49,110 --> 01:11:50,290 They're inside and out, right? 781 01:11:50,850 --> 01:11:53,370 But I don't know what the, what the rest of the community thinks 782 01:11:53,370 --> 01:11:54,890 are, what the trends are towards that. 783 01:11:55,290 --> 01:11:56,950 And that just don't know when you get invested 784 01:11:56,950 --> 01:11:59,650 in something that is a backward trend. 785 01:11:59,850 --> 01:12:01,510 I'm not saying you did, because I'm saying I don't know. 786 01:12:02,510 --> 01:12:04,850 Excuse me, but you get into a little bit of that 787 01:12:04,850 --> 01:12:08,950 that as part of your analysis and we can share that information. 788 01:12:09,570 --> 01:12:13,670 We do, yes, we do include participation trends and some background information 789 01:12:13,670 --> 01:12:15,250 in that within the report. 790 01:12:17,810 --> 01:12:19,350 Why don't we let you guys keep going? 791 01:12:20,630 --> 01:12:21,230 Okay, sorry. 792 01:12:22,370 --> 01:12:26,170 So really just to kind of summarize here, I'll just take the reins. 793 01:12:27,330 --> 01:12:29,590 With the optum model, it's kind of smaller. 794 01:12:29,950 --> 01:12:33,570 Whereas we in the main park model, we had four basketball courts. 795 01:12:33,570 --> 01:12:38,630 this one's not too, you know, some of the other models are smaller than impacts the cost of 796 01:12:38,630 --> 01:12:44,150 the petrol revenue. Similarly with McNeely Park, while, like I said, it's more green field type 797 01:12:44,150 --> 01:12:50,870 development. You can build a bigger facility there with more parking. You know, access is certainly 798 01:12:50,870 --> 01:12:55,470 a question there that also comes with potentially more cost because you're doing more Earthworks, 799 01:12:55,470 --> 01:13:00,490 which you can also have more assets there. McNeely of all the sites we looked at is the one 800 01:13:00,490 --> 01:13:03,930 of both set up towards kind of that regional facility 801 01:13:03,930 --> 01:13:06,530 because while it is on the front of our community, 802 01:13:06,530 --> 01:13:10,110 it is kind of very accessible via a car 803 01:13:10,110 --> 01:13:13,750 to other adjacent communities and such. 804 01:13:15,300 --> 01:13:16,360 Can you back up on real quick? 805 01:13:16,620 --> 01:13:16,740 Yeah. 806 01:13:17,140 --> 01:13:20,940 So it might be more, but in the three panel one, 807 01:13:20,940 --> 01:13:24,160 you listed 70s out of set, 72%, 52%. 808 01:13:24,160 --> 01:13:24,380 Yes. 809 01:13:24,660 --> 01:13:27,340 And then MacNeely was the one that was the regional concern. 810 01:13:27,860 --> 01:13:30,260 Does the 52% of the survey responses 811 01:13:30,260 --> 01:13:34,700 is did that include survey and people within the region? 812 01:13:35,760 --> 01:13:41,760 Yeah, this is the 3,000 plus aspect of just the amount of that. 813 01:13:42,200 --> 01:13:44,720 Is there a sense of what, when we say pointable regional, 814 01:13:44,920 --> 01:13:45,760 what does that mean? 815 01:13:46,340 --> 01:13:49,660 And is it worth surveying people actually in that region? 816 01:13:50,000 --> 01:13:53,540 Because that number makes it look like it's less desirable. 817 01:13:54,380 --> 01:13:58,640 But if it's set up to be a big facility, it's different on this. 818 01:14:00,840 --> 01:14:13,120 question there was kind of a matrix format, but it was, you know, how often would you potentially use a indoor recreation facility at these locations that main park at outtown. 819 01:14:13,640 --> 01:14:25,880 The main dealing question was actually on on the fringe of the community, but in Mount Leven, I even really part, and then there was also options for, you know, outside of Mount Leven, but within one mile outside. 820 01:14:25,880 --> 01:14:36,400 a problem beyond one mile and the numbers just went down there and then it was daily monthly, weekly, monthly, you know, a few times a year, ever. 821 01:14:38,790 --> 01:14:41,710 So that was the survey question that went into those. 822 01:14:44,630 --> 01:14:48,330 So moving on to the determination of feasibility. 823 01:14:48,930 --> 01:14:51,030 soon if you want to run through these two slides real quick 824 01:14:56,500 --> 01:14:58,320 she's there she's 825 01:15:00,020 --> 01:15:28,200 Again, I'm sorry. I'm stable. I'm in the middle of the country. And I'm lagging behind in you. I'm sorry. So, determination of feasibility. First, to consider that youth and adults for its amateur industry, I mean, what that trend is. So, it is an $18 billion industry today. It is expected to grow. We've seen growth over the last 10 years. We're expected to see another 20% or so growth in the next five to seven years. So, that is an industry that is growing. 826 01:15:28,200 --> 01:15:32,580 is that something that you want to participate in, it's there. 827 01:15:33,240 --> 01:15:35,760 You do have a local and a regional market opportunity. 828 01:15:36,200 --> 01:15:43,740 Your proximity to population centers, the areas in which people can travel to and from your location. 829 01:15:44,680 --> 01:15:49,040 But the distance to existing facilities leads you programming out. 830 01:15:49,360 --> 01:15:50,420 And finally, the assets. 831 01:15:51,160 --> 01:15:53,580 The flexibility is very essential, right? 832 01:15:53,740 --> 01:15:57,520 To accommodate your local programs, the needs of your local individuals in your community. 833 01:15:57,520 --> 01:16:10,620 And if you decide to move into a tournament realm to have a flexible asset is essential business models that focus on in house programming and the ownership of those events have greater revenue return than programs that you do contract out. 834 01:16:11,260 --> 01:16:14,680 And finally to leverage sports operations revenue is essential. 835 01:16:15,620 --> 01:16:20,820 And yes, should you look or continue looking into the feasibility of recreation center. 836 01:16:20,820 --> 01:16:25,980 definitely the locations have trade-offs with each side. Whether it's central or perimeter, 837 01:16:26,200 --> 01:16:32,280 the access, the parking, the size, what assets are offered, are they just for your local community? 838 01:16:32,540 --> 01:16:37,240 Do you want to bring in additional people with tournaments and events and rentals? What is that 839 01:16:37,240 --> 01:16:43,460 target market? Finally, the funding. I mean, you mentioned it. Funding plans, we typically only, 840 01:16:43,940 --> 01:16:49,380 at this point, are seeing programs and facilities that are either privately funded or 841 01:16:49,380 --> 01:16:52,500 are funded through partnership opportunities 842 01:16:52,500 --> 01:16:54,420 and with strategic stakeholders. 843 01:16:54,940 --> 01:16:57,100 A lot of facilities include rental space in them 844 01:16:57,100 --> 01:17:01,320 as well that offers a 12 month a year stable revenue source. 845 01:17:01,820 --> 01:17:03,100 And finally, an operating plan. 846 01:17:03,280 --> 01:17:05,020 If you decide to move forward with this, 847 01:17:05,160 --> 01:17:06,920 I would highly suggest that you ensure 848 01:17:06,920 --> 01:17:09,220 that it's a top tier management that comes in. 849 01:17:09,640 --> 01:17:11,460 People who have operational success, 850 01:17:11,720 --> 01:17:14,140 that's with not only the programming aspects, 851 01:17:14,360 --> 01:17:17,080 but also parking maintenance and the services associated 852 01:17:17,080 --> 01:17:22,200 with that. Finally, to make sure that you plan on that long-term capital, there are replacement 853 01:17:22,200 --> 01:17:28,220 costs that are going to take place within the 5, 10, 15, 20 year and to ensure that you include 854 01:17:28,220 --> 01:17:32,760 those. But it is a feasibility, yes, from what we looked at regarding the sites. 855 01:17:33,960 --> 01:17:36,540 Great. Thank you, Susie, for all your work on it. 856 01:17:38,750 --> 01:17:42,850 So moving on to the next steps. So the four main 857 01:17:42,850 --> 01:17:47,030 the next steps that we have to kind of prioritizing the recommendations. 858 01:17:47,430 --> 01:17:52,310 So like the Seattle talked about, with those recommendations, they're set up kind of in 859 01:17:52,310 --> 01:17:57,390 those charts where, you know, kind of how long they should take once we initiate them. 860 01:17:57,590 --> 01:18:02,310 So, you know, do we want to just focus on kind of the ones that are going to take less than 861 01:18:02,310 --> 01:18:03,030 a year to start? 862 01:18:03,150 --> 01:18:06,970 That's not necessarily saying we have to do all those ones within the first year of the plan. 863 01:18:07,290 --> 01:18:10,570 But, you know, maybe we choose some of those, maybe we choose some of them that will have 864 01:18:10,570 --> 01:18:15,930 a longer time span to implement, but we can get working on them now both between the system wide 865 01:18:15,930 --> 01:18:21,150 and the part-specific recommendations. The streamlining of operations and processes, 866 01:18:21,150 --> 01:18:26,050 we talked a little bit about that. A lot of that's going to come from internal staff-led initiatives 867 01:18:26,050 --> 01:18:30,130 as Mr. McGill mentioned. Some of that's already in the process through the smart goals of the recreation 868 01:18:30,130 --> 01:18:36,070 department, you know, making decisions on acting on short-term strategies. And then like I mentioned 869 01:18:36,070 --> 01:18:41,810 before kind of making decisions for the recreation center on, you know, how much farther do we want to push this right now? 870 01:18:41,850 --> 01:18:49,870 Where do we want to go next? One of the things that we talked about a lot is kind of, you know, there's 180 recommendations in this point. 871 01:18:50,550 --> 01:18:55,530 What if we, you know, a lot of communities will have a plan done, and then it sits on the shelf for 20 years, 872 01:18:55,910 --> 01:19:03,010 black stuff, and nobody will plant anything. You know, what are kind of the most important things in this plan that if we do nothing else, these are the things we need to do. 873 01:19:03,010 --> 01:19:17,850 So it's kind of how we came up with our tier one priorities, which is these are the things that if nothing else happens, we should address these five things, which is the invasive species plan, the for sure management plan, the signage way finding connectivity. 874 01:19:17,950 --> 01:19:20,630 So that was one of the kind of biggest gaps that we saw. 875 01:19:20,630 --> 01:19:23,950 You know, there are parks that exist within the community, 876 01:19:24,570 --> 01:19:27,090 but Ridge Park for one that has zero signage, 877 01:19:27,110 --> 01:19:29,250 that if you didn't know it was there or how to get there, 878 01:19:30,150 --> 01:19:32,070 you wouldn't know there was a park there. 879 01:19:33,270 --> 01:19:36,110 And so there is some definite gaps there 880 01:19:36,110 --> 01:19:37,590 that should be addressed. 881 01:19:38,150 --> 01:19:40,510 The evaluation of field usage and efficiency, 882 01:19:41,390 --> 01:19:43,910 as we talked through kind of all of the park's 883 01:19:43,910 --> 01:19:46,310 specific recommendations, you know, 884 01:19:46,390 --> 01:19:47,870 the one that really rose to the top 885 01:19:47,870 --> 01:19:53,430 being the most kind of underutilized part currently is Sunset Hills Park or Bratford 886 01:19:53,430 --> 01:19:57,210 Tip. It's called those. That kind of gets into that community identity. 887 01:19:57,210 --> 01:20:00,450 Anything that we talked about too is kind of picking a specific name. 888 01:20:00,650 --> 01:20:04,330 But everything is, if people know about the Sunset Hills Park and it's Bratford and Park, 889 01:20:04,590 --> 01:20:07,770 if people know it as Bratford and Park, and if they don't know about the Sunset Hills Park, 890 01:20:07,770 --> 01:20:13,870 we should probably pick a name for it. So that that's really currently our most 891 01:20:14,590 --> 01:20:18,030 underutilized parks facility. So looking at those parks 892 01:20:18,030 --> 01:20:20,510 specific recommendations, if we do nothing else in this 893 01:20:20,510 --> 01:20:24,190 plan should look at improvements to Bradford Park. And then 894 01:20:24,190 --> 01:20:27,130 at least, you know, like I said, create a decision making 895 01:20:27,130 --> 01:20:30,050 plan for the recreation center. So if we, if there's things 896 01:20:30,050 --> 01:20:33,190 Mr. Garlic, Mr. Flynn, specifically who want to take a look 897 01:20:33,190 --> 01:20:36,090 at kind of making that decision, you know, we can kind of 898 01:20:36,090 --> 01:20:38,670 pull that together and at least have a plan for, here's 899 01:20:38,670 --> 01:20:41,030 what we're going to evaluate before we make a decision to 900 01:20:41,030 --> 01:20:43,230 move anything else forward on the recreation center. 901 01:20:43,490 --> 01:20:46,330 Just kind of a tier one priority is coming up with that plan 902 01:20:46,330 --> 01:20:48,470 for how we're going to make those decisions, basically. 903 01:20:49,390 --> 01:20:53,690 And then the tier two priorities, the main part master glen, 904 01:20:53,710 --> 01:20:57,710 so this is like, you know, if we just do the second set 905 01:20:57,710 --> 01:20:59,310 of things, these are the next things. 906 01:20:59,710 --> 01:21:02,890 There was a lot of items that came up when we toured main park. 907 01:21:02,930 --> 01:21:05,270 We talked to people about main park and survey responses. 908 01:21:05,550 --> 01:21:08,170 There's a lot of different ideas about out there 909 01:21:08,170 --> 01:21:08,810 for main park. 910 01:21:08,810 --> 01:21:13,890 there are some current maintenance issues that exist in main park that need to be corrected. 911 01:21:14,190 --> 01:21:19,430 There's some aging equipment there. So rather than trying to take a piecemeal approach to main park, 912 01:21:19,910 --> 01:21:24,650 the thought process was doing a full site master plan for just main park and say, okay, 913 01:21:25,050 --> 01:21:30,650 you know, if we want to install an amphitheater there, which was an idea that came up. If we want to 914 01:21:30,650 --> 01:21:36,450 sort of reorganize the playground spaces there, that was another thing that came up. 915 01:21:36,450 --> 01:21:40,430 and sort of access the types of 916 01:21:40,430 --> 01:21:41,250 flashback. 917 01:21:42,230 --> 01:21:42,690 Flashback. 918 01:21:42,690 --> 01:21:42,730 Flashback. 919 01:21:42,730 --> 01:21:44,790 The accessibility, right? 920 01:21:45,010 --> 01:21:46,950 But it's better to, and to give back to the 921 01:21:46,950 --> 01:21:49,230 Recreation Center piece, you know, if we're potentially 922 01:21:49,230 --> 01:21:51,650 considering that as a location for Recreation Center, 923 01:21:51,850 --> 01:21:54,450 how does that impact the entire rest of the park? 924 01:21:54,610 --> 01:21:56,990 So kind of thinking about main park holistically, 925 01:21:57,630 --> 01:22:01,570 sites specifically for where we want main park to go in the next 10 to 20 years, 926 01:22:02,470 --> 01:22:04,970 kind of needing a master plan for that whole site, 927 01:22:04,970 --> 01:22:07,530 rather than trying to, you know, piecemeal things together. 928 01:22:07,750 --> 01:22:10,830 But we're going to look at ADA accessibility just for this one going, 929 01:22:10,890 --> 01:22:13,130 but not look at the accessibility of the park as a whole. 930 01:22:13,790 --> 01:22:15,890 And then improving coordination and communication 931 01:22:15,890 --> 01:22:18,650 with the school district on shared facilities, I think this is something 932 01:22:18,650 --> 01:22:21,150 that comes up quite often, especially for field usage, 933 01:22:21,150 --> 01:22:24,670 that the school is using our fields. 934 01:22:24,950 --> 01:22:27,130 And we have decent communication with them right now. 935 01:22:27,230 --> 01:22:28,210 We can always do better. 936 01:22:28,750 --> 01:22:30,490 And so the other facilities feel like better, 937 01:22:30,570 --> 01:22:32,790 but there's a shared facility agreement that they're 938 01:22:35,160 --> 01:22:35,640 at as well. 939 01:22:35,640 --> 01:22:43,840 And then finally, next steps, decision points, just to put a vote on this for the commission at the next meeting in April. 940 01:22:44,200 --> 01:22:47,300 There will be a resolution on the agenda to approve and accept the plan. 941 01:22:48,200 --> 01:22:52,760 As I mentioned, further discussion and decision on kind of those next steps with the recreation center. 942 01:22:53,300 --> 01:22:57,120 And then kind of acting on any short-term strategies that require funding. 943 01:22:57,480 --> 01:23:05,240 Right now, there was $15,000 allocated as part of the 2022 budget for implementation of parks master plan. 944 01:23:05,240 --> 01:23:10,680 items so we have a little bit of money to do some of the low-ane fruit items if we want to 945 01:23:10,680 --> 01:23:16,500 address them right now. There's also a pot of $30,000 that was allocated within this year's budget 946 01:23:16,500 --> 01:23:22,640 to do the forestry management and basic species plans. We have a pot of wine to move forward with 947 01:23:22,640 --> 01:23:27,300 that right now without needing any additional funding from the commission but if there's other projects 948 01:23:27,300 --> 01:23:31,700 that require more funding right now, the commission if we consider decision points on that. 949 01:23:31,700 --> 01:23:45,380 And then finally the one of the commission priority projects from last year's retreat was a board realignment project and there was a segment in the plan that recommended considering a joint parts recreation board. 950 01:23:45,820 --> 01:23:54,560 So kind of in alignment with that commission priority project of board realignment potentially considering that as the commission considers board realignment more holistically. 951 01:23:54,560 --> 01:24:16,720 We had success in this effort with those boards coming together at multiple points in time to talk about different aspects of this planning that starts to have that again crossover and understanding of what it means to actually have some priorities to a certain number of things. 952 01:24:16,720 --> 01:24:29,520 So in giving it a dry run and the opportunities to continue on with in sort of next step is there. So I see I can read it here that staff's going to look at how to incorporate some of these recommendations. 953 01:24:29,820 --> 01:24:41,620 Can I ask the commission? Is there anyone of these 1234567 tier one or two to priorities? Don't we don't want staff time to dig into a little bit and come back to us with. 954 01:24:47,260 --> 01:25:09,200 So the only thing I'll add to that is that part of the prioritization of recommending for staff to do is to look at everything and say, okay, this is the things that, along with what we're currently working on, like the website item, some of the things like that, the field service, field usage stuff like that, maybe some of the stuff we might already be doing. 955 01:25:10,400 --> 01:25:27,860 So, and then also kind of prioritizing, okay, you know, given the restraints and time commitments of staff, you know, here's what capacity we have to address this now versus, okay, I think this would align better to work on in 2023 or this will align better to work on, you know, kind of future. 956 01:25:27,860 --> 01:25:34,920 So one thing to remember here that this is a 10 to 15 year plan. So these tier one priorities is really just saying 957 01:25:35,700 --> 01:25:41,340 It's not saying you have to do these first. It's saying if you do nothing else in the plan, you should do these things. 958 01:25:43,560 --> 01:25:44,820 It's not a time sensitive. 959 01:25:45,440 --> 01:25:49,260 I mean, I don't have an issue with any of these. I think they're all good. I would probably be ordered. 960 01:25:50,140 --> 01:25:52,220 But me and I wouldn't do them in that order. 961 01:25:53,200 --> 01:25:54,380 But you like all of them? 962 01:25:54,540 --> 01:25:56,320 Yeah, I think all we need to be done. 963 01:25:56,320 --> 01:26:03,300 Well, I like the idea of defining the recreation parks 964 01:26:03,300 --> 01:26:06,740 master plan kind of board, and I think that's timely 965 01:26:06,740 --> 01:26:08,200 considering what we're talking about. 966 01:26:08,540 --> 01:26:10,280 So I like that idea, and if we're going to do that, 967 01:26:10,720 --> 01:26:13,300 they should probably be involved in some of these things. 968 01:26:13,540 --> 01:26:14,840 So it's probably put that first. 969 01:26:15,360 --> 01:26:17,460 We've been talking about evaluating field usage 970 01:26:17,460 --> 01:26:20,620 for a long time, and the results of that data 971 01:26:20,620 --> 01:26:23,280 would have an impact on anything else that we do. 972 01:26:23,280 --> 01:26:34,180 So the potential would be to put that higher at the top, that will have budget concerns which I would weigh against doing invasive species and signage of way fine. 973 01:26:34,760 --> 01:26:40,220 Like there were up to me to build an extra field or put signs up, you know, I build an extra field every day. 974 01:26:41,080 --> 01:26:41,880 on Sundays. 975 01:26:47,500 --> 01:26:53,080 I think it's going to be much consideration. And then, you know, questions about, 976 01:26:53,320 --> 01:26:57,140 you know, which of these are going to drive the most value? That's right. That's where we put it, 977 01:26:57,460 --> 01:27:02,620 the order of operation, whatever. So I would want to specify that before we get. I think staff, 978 01:27:02,620 --> 01:27:07,300 we should spend on all this. Okay. But I think we need to determine internally what's the order of 979 01:27:07,300 --> 01:27:08,280 operations for that? 980 01:27:08,640 --> 01:27:13,420 Well, my instinct isn't so much which ones and when, 981 01:27:14,040 --> 01:27:16,780 I think the staff is mentally qualified to do that. 982 01:27:16,920 --> 01:27:19,680 It's more a question of what's the framework for next steps? 983 01:27:20,520 --> 01:27:23,020 For me, it's not, are we doing the right center or not? 984 01:27:23,320 --> 01:27:26,120 It's what's the next step to move the dialogue forward? 985 01:27:27,840 --> 01:27:32,000 You know, with these other items as well, right? 986 01:27:32,140 --> 01:27:33,300 The short-term stuff, right? 987 01:27:34,680 --> 01:27:36,540 I don't know that, again, it's like I was saying 988 01:27:36,540 --> 01:27:38,040 with the solar on the library. 989 01:27:38,360 --> 01:27:38,980 I'm not qualified. 990 01:27:39,480 --> 01:27:41,080 There are people who are qualified 991 01:27:41,080 --> 01:27:42,400 to make those types of decisions. 992 01:27:42,840 --> 01:27:44,440 What's the process to move that forward? 993 01:27:45,040 --> 01:27:46,460 We will tell you what the budget is now. 994 01:27:46,580 --> 01:27:47,560 You know what the budget is now. 995 01:27:48,240 --> 01:27:50,620 You can tell us what we'd like for the budget next year 996 01:27:51,100 --> 01:27:51,860 for those items. 997 01:27:52,720 --> 01:27:55,180 But you tell me what's the next step 998 01:27:55,180 --> 01:27:57,460 and who's going to help work in that process. 999 01:27:57,840 --> 01:27:58,440 Is it a board? 1000 01:27:58,920 --> 01:27:59,440 Is it just staff? 1001 01:28:00,460 --> 01:28:01,360 When will we get updates? 1002 01:28:01,520 --> 01:28:02,780 I assume when a budget comes along? 1003 01:28:03,500 --> 01:28:05,140 For me, that's the process. 1004 01:28:05,140 --> 01:28:07,560 This is a great plan. I'm really impressed. 1005 01:28:07,960 --> 01:28:10,560 This is my my my concern with the right center. 1006 01:28:11,540 --> 01:28:17,800 But this is fantastic. And so now for me as a question of how do we structurally embed this that there is a process going forward. 1007 01:28:18,140 --> 01:28:21,460 Because this commission is not going to be here long enough to scale this example. 1008 01:28:21,880 --> 01:28:28,680 So how do we make sure that there's a process that embedded with staff, the next generation of commissioners are like, oh, it's already going. 1009 01:28:29,660 --> 01:28:30,100 That's. 1010 01:28:30,100 --> 01:28:37,320 I think that's really important because I think each of us can pick apart or support any one of 1011 01:28:37,320 --> 01:28:41,400 these things in here and then it just goes on and on and on. If we turn this over to the next 1012 01:28:41,400 --> 01:28:47,560 commission, same things are going to happen. So, you know, I don't know, that's something we do, 1013 01:28:47,840 --> 01:28:54,220 staff does, consultants do, but I agree with that attacking it in that way so that we can put that in 1014 01:28:54,220 --> 01:29:03,080 place and push it. Yeah, push it down the road. Yeah, it's coming next budget season and there's 1015 01:29:03,080 --> 01:29:06,680 going to be a certain amount that's going to be put aside for wayfinding and for this and for that 1016 01:29:06,680 --> 01:29:11,800 and whatever the board and staff have come to the conclusion on these are the ones that coming out of 1017 01:29:11,800 --> 01:29:17,480 this plan. These are the tier one, you know, recommendations. So get something to vote on. 1018 01:29:20,320 --> 01:29:23,580 the parks advisory board can't utilize in the parks because the 1019 01:29:23,580 --> 01:29:27,440 park conditions catch when they make their you know their list for the 1020 01:29:27,440 --> 01:29:30,620 commission for the capital plan is feeding that off of the park specific 1021 01:29:30,620 --> 01:29:34,420 recommendations and sports advisory board. So let me get sure I understand that. 1022 01:29:34,560 --> 01:29:38,480 So I'll go back to the parks advisory board and the liaison and ask them when 1023 01:29:38,480 --> 01:29:42,480 they have time to when will they have time to go through this but they 1024 01:29:42,480 --> 01:29:45,640 don't see this. They haven't seen the final version yet until they sleep. 1025 01:29:45,640 --> 01:29:46,540 We weren't even adopted. 1026 01:29:47,960 --> 01:29:49,220 What do we want them to do? 1027 01:29:49,860 --> 01:29:50,440 They should. 1028 01:29:51,560 --> 01:29:53,680 In some of it is there's crossover between, right? 1029 01:29:53,760 --> 01:29:55,880 We have 16 parks with 180 recommendations. 1030 01:29:56,420 --> 01:29:59,960 But 16 parks, I think 15 of them probably have something. 1031 01:30:00,600 --> 01:30:29,800 So, if you just take the signage thing and say, okay, signage is a priority, we're going to put signage at number of, like, two on the parks advisory boards list, right? Then you say, okay, signage would cost probably this much, they will sketch it out as a three year capital and that's something like that. We'll do the money, they'll do the just rankings. Right. But they can, they can use these to make their rankings. And the last and the sports board to do the field usage information. We need to have someone else in there doing that. 1032 01:30:29,800 --> 01:30:33,500 because the people we have internally don't even believe they want to be done, 1033 01:30:33,780 --> 01:30:39,100 and the people on the sports side have resisted doing or putting together any of that information. 1034 01:30:39,720 --> 01:30:42,460 Like we asked them for their team sizes, we're not going to get it. 1035 01:30:42,460 --> 01:30:49,560 So we need to force that discovery, and that will be easier done with an external group 1036 01:30:49,560 --> 01:30:52,320 that will be done with your internal group staff. 1037 01:30:53,360 --> 01:30:57,640 Yeah, let's talk about that. We did make sure that a progress and they would like 1038 01:30:57,640 --> 01:31:00,960 I don't know what to do with the information, the research that they have who's going 1039 01:31:00,960 --> 01:31:01,860 to hold that movement. 1040 01:31:02,240 --> 01:31:07,600 And some of that was that as we were finalizing this plan, the sports advisory board was finalizing 1041 01:31:07,600 --> 01:31:09,600 their collection of information on field usage. 1042 01:31:09,600 --> 01:31:15,140 So we didn't have the final field usage data from the sports board at the time of production 1043 01:31:15,140 --> 01:31:15,740 of this plan. 1044 01:31:16,100 --> 01:31:20,100 So that was kind of why it was a next step was the sports advisory board to finalize that 1045 01:31:20,100 --> 01:31:22,300 gathering of information of what they're doing. 1046 01:31:24,920 --> 01:31:26,020 That's the real question. 1047 01:31:26,240 --> 01:31:27,160 I hate to cut short. 1048 01:31:27,340 --> 01:31:27,880 Yeah, it's okay. 1049 01:31:27,880 --> 01:31:28,540 It's eight o'clock. 1050 01:31:28,540 --> 01:31:29,220 We've got to go. 1051 01:31:29,560 --> 01:31:30,980 Thank you very much. 1052 01:31:31,000 --> 01:31:31,920 Thank you very much. 1053 01:31:32,160 --> 01:31:32,340 Yeah. 1054 01:31:33,100 --> 01:31:33,940 Amazing work. 1055 01:31:34,160 --> 01:31:34,880 Everybody involved. 1056 01:31:35,600 --> 01:31:36,300 That was a danger. 1057 01:31:37,180 --> 01:31:37,320 Yeah. 1058 01:31:38,900 --> 01:31:40,020 We appreciate you. 1059 01:31:40,360 --> 01:31:40,800 Thank you. 1060 01:31:40,940 --> 01:31:41,600 We will. 1061 01:31:42,000 --> 01:31:42,620 Follow up. 1062 01:31:42,720 --> 01:31:43,180 Yes. 1063 01:31:43,560 --> 01:31:44,960 We will stay in that time. 1064 01:31:45,160 --> 01:31:45,260 Sure. 1065 01:31:45,760 --> 01:31:46,480 You will. 1066 01:31:48,160 --> 01:31:48,860 Thank you. 1067 01:31:49,060 --> 01:31:49,680 Thank you. 1068 01:31:49,680 --> 01:31:52,740 Thank you very much. We are adjourned and I will see you on the other side.