1 00:01:02,510 --> 00:01:06,450 Good evening, welcome to the first workshop for the proposed 2027 budget. 2 00:01:06,850 --> 00:01:09,970 Councilman Sayed will be participating by phone tonight. 3 00:01:10,690 --> 00:01:12,650 Councilman Sayed, can you hear us? 4 00:01:12,950 --> 00:01:14,510 Yes, I can hear you. 5 00:01:15,090 --> 00:01:19,590 Okay. Tonight our professional staff will focus on the preliminary capital improvement program. 6 00:01:20,130 --> 00:01:24,670 As a reminder, no final actions are being taken at this meeting since it is a workshop. 7 00:01:25,630 --> 00:01:28,590 Also, all the rules of the city council will still apply. 8 00:01:28,590 --> 00:01:32,510 speakers are asked to present their comments and a respectful and curious manner. 9 00:01:33,190 --> 00:01:37,250 Speakers should be on topic and be cognizant of their words. 10 00:01:37,770 --> 00:01:41,490 Speakers are given three minutes to address a city council and to help speakers stay within 11 00:01:41,490 --> 00:01:42,490 the three-minute timeframe. 12 00:01:42,950 --> 00:01:46,030 Speakers should be aware of the timer on the side, diastue, your right. 13 00:01:46,930 --> 00:01:50,690 The timer will buzz when it's zero and we will alert the speaker that their time is up. 14 00:01:50,950 --> 00:01:54,730 Mr. Krieger, I want to call the first four. 15 00:01:54,730 --> 00:02:01,390 All right, the first four speakers would be Theresa Huss, Joe Huss, Patrick Kennedy, and John Doyle. 16 00:02:01,690 --> 00:02:05,550 If you've heard your name called, just please proceed to the front row. 17 00:02:05,930 --> 00:02:06,550 Thank you. 18 00:02:14,260 --> 00:02:17,360 Hi, Theresa Huss, longtime resident and a member of Nest. 19 00:02:18,160 --> 00:02:23,140 I know tonight's meeting is focused on the capital budget, but I'd like to look ahead to the next meeting, 20 00:02:23,340 --> 00:02:27,740 the operating budget, and urge you to consider funding a climate action plan. 21 00:02:27,740 --> 00:02:43,040 The Climate Action Plan would be a one-time cost of about 0.015% of our annual budget, and it would give us a clear framework for measuring tracking and reducing our greenhouse gas emissions while preparing for the impacts of climate change. 22 00:02:43,720 --> 00:02:51,400 At their core, these plans focus on implementing the most cost-effective actions to reduce emissions and strengthen our long-term resilience. 23 00:02:51,400 --> 00:02:54,660 And we've been talking about climate action plans for years. 24 00:02:55,080 --> 00:03:00,660 It began back in 2019 when the City Council directed NEST to prepare an April 2036. 25 00:03:01,020 --> 00:03:06,520 It continued through last year when we completed our greenhouse gas inventory in 2025, both 26 00:03:06,520 --> 00:03:10,120 of those being important precursors to having an official plan. 27 00:03:10,680 --> 00:03:15,300 And many of you on the diet have expressed support for developing one and say you understand 28 00:03:15,300 --> 00:03:16,080 their importance. 29 00:03:16,500 --> 00:03:19,340 So our question is, if not now, when. 30 00:03:19,340 --> 00:03:24,580 Naperville has already shown it can lead, our annual sustainability work plans of help move 31 00:03:24,580 --> 00:03:26,220 individual initiatives forward. 32 00:03:27,020 --> 00:03:30,880 Staff have worked really hard to keep sustainability on the agenda. 33 00:03:31,380 --> 00:03:36,480 But work plans alone can't provide the long-term structure that we need. 34 00:03:36,720 --> 00:03:43,660 A climate action plan would allow us to measure progress year after year and identify the most cost-effective actions, 35 00:03:44,220 --> 00:03:47,840 ensuring our investments align with the clear and forward-looking vision. 36 00:03:47,840 --> 00:03:52,080 Funding a climate action plan is also fiscally responsible. 37 00:03:52,780 --> 00:03:57,220 Communities with climate plans are better positioned to compete for federal and state grants 38 00:03:57,220 --> 00:04:00,180 tied to clean energy sustainability and infrastructure. 39 00:04:01,260 --> 00:04:07,060 A plan would help prioritize our actions and save us money over time through energy efficiency, 40 00:04:07,860 --> 00:04:10,860 reduced operational costs, and avoided future risks. 41 00:04:11,420 --> 00:04:15,560 And most importantly, a climate action plan would reflect the values of 42 00:04:16,540 --> 00:04:36,460 The recent survey show that sustainability is a high priority for residents, many of us already work on sustainability in our neighborhoods, our schools, our faith communities, and in organizations like Nest, but a citywide plan would bring these efforts together and demonstrate that Naperville is committed to thoughtful and long-term stewardship. 43 00:04:36,460 --> 00:04:41,260 So, I respectfully urge the Council to fund the development of a climate action plan. 44 00:04:41,600 --> 00:04:45,080 It's a practical, community-driven investment in Naples Future. 45 00:04:45,720 --> 00:04:47,660 And now is the right time to move forward. 46 00:04:48,100 --> 00:04:49,180 Thank you for your time. 47 00:04:50,120 --> 00:04:50,440 Thank you. 48 00:04:50,640 --> 00:04:50,860 Thanks, Speaker. 49 00:04:52,860 --> 00:04:54,000 The Speaker shall us. 50 00:05:03,410 --> 00:05:14,970 Thank you. My name is Jeoha. I'm a 27-year resident and an S. Fontier and I have two questions. Why didn't we put any money in the capital budget for a battery? 51 00:05:15,690 --> 00:05:20,310 And second, why would we assume I am a should operate the battery if we purchase one? 52 00:05:21,090 --> 00:05:29,030 My recommendation is simple. Put some capital in the budget for a battery and use a competitive process to choose the best battery operator. 53 00:05:30,570 --> 00:05:36,230 First, why doesn't the capital budget include any funding for a battery, both the cities and 54 00:05:36,230 --> 00:05:41,590 NASA analysis indicated that a battery would quickly pay for itself and reduce our electricity 55 00:05:41,590 --> 00:05:42,190 bills. 56 00:05:42,830 --> 00:05:48,270 The value is not only financial, as you can see on the slide, the city's consultant found 57 00:05:48,270 --> 00:05:52,150 that the battery can address several existing reliability violations. 58 00:05:52,850 --> 00:05:58,350 Delaying action not only increases the risk of a serious outage, but also risk losing millions 59 00:05:58,350 --> 00:06:02,870 of dollars in federal investment tax credits that we'd get with a battery purchase. 60 00:06:03,730 --> 00:06:09,190 The prudent step is to reserve capital in the budget now, only to be spent if there's 61 00:06:09,190 --> 00:06:10,630 a compelling business case. 62 00:06:12,860 --> 00:06:16,700 And second, why would we assume IMEA would run the battery? 63 00:06:17,120 --> 00:06:23,060 In an email from the city to the battery author, I've said, quote, IMEA expects to control 64 00:06:23,060 --> 00:06:23,700 the battery. 65 00:06:23,700 --> 00:06:29,260 At the last electricity presentation, Council emphasized the importance of local control. 66 00:06:30,020 --> 00:06:35,880 IMA is a government entity based in Springfield, and it's not clear why, if any, 67 00:06:35,920 --> 00:06:40,560 utilities, if they have any utility scale, battery operating experience. 68 00:06:41,220 --> 00:06:45,280 They likely don't have the systems or the processes operate, one effectively. 69 00:06:46,180 --> 00:06:52,880 Naperville should instead follow our procurement process, experience firms operating hundreds of batteries nationwide, 70 00:06:52,880 --> 00:06:54,620 and can compete for our business. 71 00:06:55,440 --> 00:06:57,240 A battery would allow us to earn money 72 00:06:57,240 --> 00:07:00,500 through ancillary services such as frequency regulation 73 00:07:01,000 --> 00:07:02,620 and capacity sales. 74 00:07:04,700 --> 00:07:07,200 Although our current contract restricts us 75 00:07:07,200 --> 00:07:09,380 to only purchase electricity from INA, 76 00:07:10,040 --> 00:07:11,880 it's silent on battery operations 77 00:07:11,880 --> 00:07:13,900 because batteries weren't an option 78 00:07:13,900 --> 00:07:15,280 when the contract was written. 79 00:07:15,980 --> 00:07:18,620 Competitive bidding is the best way to contain costs. 80 00:07:19,360 --> 00:07:22,180 In closing, Council voted unanimously 81 00:07:22,180 --> 00:07:27,200 to direct the city to gather information for a battery business case to save Naperville residents 82 00:07:27,200 --> 00:07:32,620 and businesses money. But a business case is only it only creates value if the city is prepared 83 00:07:32,620 --> 00:07:39,000 to act and I ask the council to preserve some capital in the budget for a battery and require 84 00:07:39,000 --> 00:07:44,360 a competitive process before selecting an operator. That approach protects Naperville's options 85 00:07:44,360 --> 00:07:50,260 and gives residents the best chance for lower costs and better reliability. Thank you. 86 00:07:50,860 --> 00:07:52,040 Thank you, next speaker. 87 00:08:10,800 --> 00:08:11,380 Good evening. 88 00:08:11,560 --> 00:08:12,340 My name is Pat Kennedy. 89 00:08:12,980 --> 00:08:15,580 Resident and former chairman of the Riverwalk Commission. 90 00:08:17,740 --> 00:08:25,120 I want to give some context to the CIP request on behalf of the Riverwalk Commission for the South Extension Project specifically. 91 00:08:27,540 --> 00:08:32,700 The Riverwalk, it's shown on the screen here, but this section of the Riverwalk was originally expanded. 92 00:08:32,700 --> 00:08:36,420 the limits in 2015 for the boundaries of the river walk. 93 00:08:36,500 --> 00:08:38,580 This was planned for quite some time. 94 00:08:40,520 --> 00:08:40,980 Thank you. 95 00:08:41,100 --> 00:08:46,240 The master plan was endorsed in 2021, including this project 96 00:08:46,240 --> 00:08:48,740 and held public review at that point. 97 00:08:49,060 --> 00:08:52,460 It prepared design and permitting documents in 2023. 98 00:08:54,000 --> 00:08:57,760 At that point, I had met with Endeavor Edward Hospital 99 00:08:57,760 --> 00:08:59,640 and outlined the project for them. 100 00:08:59,640 --> 00:09:01,540 And the idea was that it would open and concurrent 101 00:09:01,540 --> 00:09:08,520 with their cardiovascular building which now open the last fall with permitting and 102 00:09:09,420 --> 00:09:13,900 permitting and design in 24 construction in 25 and a concurrent opening. 103 00:09:14,280 --> 00:09:24,940 And at that time, we had procured grant from Janet Eang-Ror and her group and her office. 104 00:09:24,960 --> 00:09:30,500 I appreciate that and asked the hospital to come up with another donation that would get us 105 00:09:30,500 --> 00:09:35,360 50% of the total budget at the time, which was $3 million, and they did so enthusiastically. 106 00:09:36,400 --> 00:09:40,180 They put that money in our account in 2024, where it still sits today. 107 00:09:41,400 --> 00:09:45,260 The project got deferred for one year, I don't exactly recall why. 108 00:09:45,840 --> 00:09:50,600 Last year, the project got deferred because the bridge was delayed, and the 430 South 109 00:09:50,600 --> 00:09:56,160 Washington project, therefore, got pushed back a year, and the council determined that 110 00:09:56,160 --> 00:09:59,960 That was too many projects in one year for the River Walk in the Capital and Prick. 111 00:10:00,000 --> 00:10:07,500 So, it's currently in the CIP to go to bid this fall, this outfit extension is. 112 00:10:10,400 --> 00:10:19,940 The commission proactively reworked our five year look ahead to decrease various projects by over $3.5 million and push them into the future to accommodate this as our priority. 113 00:10:23,000 --> 00:10:27,920 I personally believe that there's a return on investment for anything we do with our river walk, 114 00:10:28,040 --> 00:10:33,980 our businesses, our households, and home values, and our reputation is all driven by this 115 00:10:33,980 --> 00:10:36,520 jewel we have as a river walk in this city. 116 00:10:39,260 --> 00:10:42,360 In addition, we have this commitment to one of our 117 00:10:42,360 --> 00:10:48,960 great institutions in town and in debt for Edward Hospital. I think the time is now the investment 118 00:10:48,960 --> 00:10:52,820 as the right investment, and we ask you to include this project in the CIP. 119 00:10:53,360 --> 00:10:54,140 Thank you. 120 00:10:54,800 --> 00:10:55,120 Thank you. 121 00:10:55,360 --> 00:10:55,360 Next 122 00:10:58,300 --> 00:11:04,440 speaker is John Doyle, followed by Katie Wood and Chris Hartner. 123 00:11:17,250 --> 00:11:18,330 John Doyle and Aprilville, President. 124 00:11:18,750 --> 00:11:19,410 Thank you. 125 00:11:20,110 --> 00:11:24,750 Paul G's for not sending these in advance, but I do have some questions on the debt strategy 126 00:11:24,750 --> 00:11:26,270 for our electric utility. 127 00:11:27,090 --> 00:11:31,310 First off, tonight's plan shows up to $10 million in new debt for $207. 128 00:11:31,310 --> 00:11:36,130 Is there any borrowing and already anticipated beyond 2027 and if so, how much? 129 00:11:36,770 --> 00:11:40,930 You know, next year's rate study is going to determine revenue requirement for 28 through 2030. 130 00:11:41,810 --> 00:11:46,950 How are you going to make the decision on what gets paid for through borrowing and what gets paid for through rates? 131 00:11:48,890 --> 00:11:53,750 The summary says the utilities that coverage ratio is a well below integer standards, which is great. 132 00:11:54,130 --> 00:11:57,990 So just curious, what range are we comfortable operating on now that we're taking on debt? 133 00:11:58,710 --> 00:12:03,070 And I say now that we're taking on debt, it seems that 2025's barring was the first new 134 00:12:03,070 --> 00:12:08,810 debt since 2011, and we are on track for three consecutive years of barring, so why 135 00:12:08,810 --> 00:12:10,930 the sudden change in funding philosophy? 136 00:12:12,810 --> 00:12:19,030 And lastly, but not least, any benefits that we are getting from barring potentially such as increased 137 00:12:19,030 --> 00:12:19,930 rates of stability. 138 00:12:20,530 --> 00:12:24,470 We need those benefits depend on who our wholesale power provider is or can we do that 139 00:12:24,470 --> 00:12:26,270 regardless of who we buy our power from. 140 00:12:27,710 --> 00:12:32,090 I'll also have some questions about the 2027 project list specifically. 141 00:12:33,690 --> 00:12:38,190 This plan includes almost $30 million in investments for the utility, but only about 142 00:12:38,190 --> 00:12:41,850 two thirds of that are accounted for in the presentation, so I'm asking where the other 143 00:12:41,850 --> 00:12:42,830 $10 million is. 144 00:12:43,890 --> 00:12:47,870 My assumption is that it's just all for recurring programs that happen every year and if that's 145 00:12:47,870 --> 00:12:52,610 the case, my question would be, is $10 million the expected annual run rate for those programs 146 00:12:52,610 --> 00:12:53,710 going forward. 147 00:12:54,790 --> 00:12:58,930 Separately regarding the debt I mentioned, which projects will have the $10,000,000,000 148 00:12:58,930 --> 00:13:00,370 tied to the U.T. tax purposes. 149 00:13:02,150 --> 00:13:04,930 And lastly, I want to talk about the total way of substation projects. 150 00:13:05,310 --> 00:13:08,610 It's become quite hard to keep track of when we're spending and where we're spending on 151 00:13:08,610 --> 00:13:12,810 what given the scope creep over the years and, you know, this is going on in 2021. 152 00:13:13,870 --> 00:13:18,510 It would be really appreciated if the utility and staff could give us a little more detail 153 00:13:18,510 --> 00:13:22,470 on what's going on with that project, you know, something similar to what the water utility 154 00:13:22,470 --> 00:13:28,170 did with the Spring Book project. I know this is an order of magnitude cheaper than the water project, 155 00:13:28,230 --> 00:13:32,930 but it would still be nice to know, for example, how much of that $6 million is for delivery 156 00:13:32,930 --> 00:13:37,450 of something that we ordered two years ago? I know that's going to be a big chunk of it. 157 00:13:38,710 --> 00:13:42,170 So yeah, those are my questions, and I'll get those emailed out after I'm sorry for not 158 00:13:42,170 --> 00:13:45,990 sending them in advance, but if you can get them tonight, that would be appreciated. Thank you. 159 00:13:46,590 --> 00:13:47,290 Thank you, next speaker. 160 00:13:49,480 --> 00:13:52,740 The speaker is Katie Wood followed by Chris Sartner and Monica 161 00:13:57,440 --> 00:14:02,300 Good evening, Mayor Whirlie and members of the City Council on Katie Wood with the Downtown 162 00:14:02,300 --> 00:14:07,260 Naperville Alliance here tonight with Don Portner with the DNA Monica Conners from the 163 00:14:07,260 --> 00:14:11,960 NDP Chris Hartner from Naperville Running Company. We're representing the boards of the DNA 164 00:14:11,960 --> 00:14:18,060 and DAC, the Downtown Advisory Committee. First, thank you for keeping the design of the Nichols 165 00:14:18,060 --> 00:14:23,640 Library Parking Deck in the 2027 budget that has been our goal from the very beginning design 166 00:14:23,640 --> 00:14:27,040 in 2027 with the hope of building in 2028. 167 00:14:27,740 --> 00:14:28,580 We've done the work. 168 00:14:28,940 --> 00:14:31,480 Starting this year, we've met with the Library Board of Trustees. 169 00:14:31,720 --> 00:14:33,340 We've met with the Chamber of Commerce. 170 00:14:33,880 --> 00:14:36,520 The Naperville Development Partnership, the River Walk Commission, 171 00:14:36,800 --> 00:14:39,240 DAC, DNA in each one of you. 172 00:14:39,380 --> 00:14:41,240 We've received support from all. 173 00:14:41,760 --> 00:14:43,840 And we continue to hear the same thing. 174 00:14:44,380 --> 00:14:46,000 Downtown needs more parking. 175 00:14:46,540 --> 00:14:48,540 Our businesses tell us parking limits. 176 00:14:48,980 --> 00:14:50,420 Their ability to do more business. 177 00:14:50,660 --> 00:14:52,960 Developers tell us perspective tenets. 178 00:14:52,960 --> 00:14:59,960 ask about parking when considering downtown Aprilville consumers tell us this repeatedly and now we have full 179 00:15:00,000 --> 00:15:08,500 Verify significant developments on the horizon that could bring approximately 160,000 additional square feet of commercial space downtown. 180 00:15:09,220 --> 00:15:11,880 We need to plan for that growth, not react to it. 181 00:15:12,080 --> 00:15:21,540 That's why we're concerned about moving construction of the Nichols Library deck from 2027, 2028, out 5, 6 years to 2031, 32. 182 00:15:21,540 --> 00:15:32,900 We've already delayed this project, plans were developed in 2008, revisited again several years later, waiting till 2032 means we've been talking about this location for over 25 years. 183 00:15:33,620 --> 00:15:43,180 In 2031, as Naperville's Phi Centennial, we should enter that celebration with this infrastructure in place, not begin major construction right in the middle of it. 184 00:15:43,180 --> 00:15:49,060 If capital priorities have to be made, we believe nickels should even come before additional 185 00:15:49,060 --> 00:15:50,000 streetscape work. 186 00:15:50,500 --> 00:15:55,500 Streetstap is very important that adding parking capacity is more important right now to 187 00:15:55,500 --> 00:15:57,540 downtown's economic health and future. 188 00:15:58,880 --> 00:16:03,800 We were also surprised to see the municipal center deck emerge as a priority with significant 189 00:16:03,800 --> 00:16:07,180 downtown parking fund dollars potentially used for that renovation. 190 00:16:07,180 --> 00:16:16,920 We understand that debt needs maintenance, but it primarily serves the government campus with really limited use by downtown shoppers and diners. 191 00:16:17,380 --> 00:16:26,380 With limited downtown parking funds available, we believe they should first be invested, where they can add parking capacity directly to support our downtown businesses. 192 00:16:26,380 --> 00:16:32,740 So tonight, we have three asks of you, keep the nickels design moving forward, please, in 193 00:16:32,740 --> 00:16:39,840 2027, that move the construction significantly sooner than 2031, 302 by considering 194 00:16:39,840 --> 00:16:44,940 the priorities, readjusting priorities of future streetscapes. 195 00:16:45,080 --> 00:16:46,240 We want to get that moving. 196 00:16:47,000 --> 00:16:52,520 And thirdly, please reconsider the use of the downtown parking fund dollars for the municipal 197 00:16:52,520 --> 00:16:59,120 That fund was created to support public parking in the CBD and those dollars really should be invested. 198 00:17:00,040 --> 00:17:01,040 Sorry, I'm at it time. 199 00:17:01,680 --> 00:17:01,920 Thank you. 200 00:17:02,040 --> 00:17:03,000 We have a head start. 201 00:17:03,660 --> 00:17:04,580 Let's get this going. 202 00:17:04,980 --> 00:17:06,620 I appreciate your time. 203 00:17:06,840 --> 00:17:07,360 Thanks, Speaker. 204 00:17:08,040 --> 00:17:11,640 Next speaker is Chris Artner followed by Monica counters and Neil Malone. 205 00:17:12,740 --> 00:17:18,040 I'm Chris Artner, owner of Naperville Running Company, downtown business owner, downtown property owner, 206 00:17:18,040 --> 00:17:22,720 and I live right off of downtown and it might be pretty quick because Katie covered I think 207 00:17:22,720 --> 00:17:29,580 all the important stuff. I just want to reiterate that in the development of the food and 208 00:17:29,580 --> 00:17:38,920 beverage 1% I think I don't recall the exact wording that's in that document but nobody 209 00:17:39,960 --> 00:17:44,660 of all the people we worked with on it. I don't think anybody ever thought that it would be considered 210 00:17:44,660 --> 00:17:53,380 to be used for anything but something built and used for people coming downtown, shopping, eating, 211 00:17:54,080 --> 00:17:59,320 working, whatever it might be. There is never any consideration that it might be used as for 212 00:17:59,320 --> 00:18:06,610 the municipal deck and that's pretty much all I wanted to say on that. Thank you, next speaker. 213 00:18:07,130 --> 00:18:10,290 Next speaker, Monica Conner's, followed by Neil Malone. 214 00:18:13,250 --> 00:18:18,670 Good evening, city council and Mayor 215 00:18:18,670 --> 00:18:23,210 here tonight to say a few words about the Nichols parking garage and downtown neighborhood. 216 00:18:24,170 --> 00:18:27,070 Downtown neighborhood brings our city what we need economically. 217 00:18:27,850 --> 00:18:32,170 Tremendous property tax revenue which helps the schools in the city. 218 00:18:32,650 --> 00:18:37,750 Tremendous sales tax revenue in the form of sales tax and food and beverage sales tax. 219 00:18:38,310 --> 00:18:42,890 Thousands and thousands of jobs and a quality of life for our community. 220 00:18:42,890 --> 00:18:50,870 According to Placer AI's 60% of the 9 million visits from downtown, come from people outside of Naperville. 221 00:18:51,530 --> 00:18:54,410 That lowers the tax burden on all of our residents. 222 00:18:57,170 --> 00:19:01,010 The nickels parking structure has always been part of the 2030 plan as you've heard. 223 00:19:01,590 --> 00:19:03,090 Unfortunately, it was delayed in 2008. 224 00:19:03,670 --> 00:19:11,290 If we continue to delay this project, it will only cost the community more in impacts to lost sales tax revenue 225 00:19:11,290 --> 00:19:16,930 and higher construction cost. According to research, construction costs have increased 226 00:19:16,930 --> 00:19:23,850 68 to 80 percent since 2008 and about 5 to 13 percent annually. 227 00:19:24,390 --> 00:19:30,250 Gushman Wakefield just last week issued a report that showed construction commodities of 13 228 00:19:30,250 --> 00:19:36,970 percent year over year that affects construction materials. This is why the NDP board wants to build 229 00:19:36,970 --> 00:19:39,590 the Nichols parking structure had its highest capacity, 230 00:19:40,250 --> 00:19:42,890 because it maximizes our investment for the future. 231 00:19:44,190 --> 00:19:47,610 About eight weeks ago, I attended a virtual retail seminar, 232 00:19:47,950 --> 00:19:51,030 hosted by ICSC in a national council shopping center, 233 00:19:51,510 --> 00:19:54,030 that was led by a national retail sales consultant. 234 00:19:54,570 --> 00:19:57,190 They post three questions, retailers want to understand 235 00:19:57,190 --> 00:19:58,610 in order to choose a location. 236 00:20:00,000 --> 00:20:08,680 And they serve enough customers. Two, can they generate profitable sales, profitable? Three, can they operate successfully 237 00:20:08,680 --> 00:20:14,660 over the long term, not the short term? All of this depends on parking supply, which is likely 238 00:20:14,660 --> 00:20:19,400 why the consultant listed parking and infrastructure is one of the top three items we have 239 00:20:19,400 --> 00:20:29,360 to demonstrate in order to be successful. One of the things that is impressed me about the most 240 00:20:29,360 --> 00:20:34,700 decades. Today is not the day to stop thinking about the future, parking impacts 241 00:20:34,700 --> 00:20:39,820 our ability to land new tenants and retain the tenants that we currently have. It 242 00:20:39,820 --> 00:20:44,240 directly affects our sales tax revenue, our food and beverage revenue, which 243 00:20:44,240 --> 00:20:48,800 impacts seek a fund, police, fire, so many things. With so much development in 244 00:20:48,800 --> 00:20:53,300 our line of sight and DP fields we need to invest now to be successful in the 245 00:20:53,300 --> 00:20:56,880 future. Thank you. Thank you, next speaker. 246 00:20:56,880 --> 00:20:59,180 The final speaker is Neil Malone. 247 00:21:06,130 --> 00:21:06,690 Good evening, Mayor. 248 00:21:06,890 --> 00:21:07,670 Members of the council. 249 00:21:08,250 --> 00:21:10,450 Thank you for allowing me opportunity to provide some comments. 250 00:21:11,470 --> 00:21:12,290 My name is Neil Malone. 251 00:21:12,550 --> 00:21:16,350 I serve as Director of Government Affairs for the Naperville Area Chamber of Commerce. 252 00:21:17,850 --> 00:21:20,510 We have submitted comments. 253 00:21:21,150 --> 00:21:24,010 Written comments as well from myself and from ours. 254 00:21:24,250 --> 00:21:25,010 You know, Killing Resolve. 255 00:21:25,490 --> 00:21:26,350 It was a little period of night. 256 00:21:26,950 --> 00:21:32,190 But I feel like I'm hitting clean up on a really good baseball team tonight because 257 00:21:32,190 --> 00:21:38,410 The three speakers in front of me really did a great job of laying out the case for why this is needed and why this is needed now 258 00:21:38,410 --> 00:21:41,250 We had really five areas in which 259 00:21:42,190 --> 00:21:44,250 Really kind of speak to the need for the structure 260 00:21:45,930 --> 00:21:51,970 One is it addresses a long-term and long-standing infrastructure need as you've heard 261 00:21:51,970 --> 00:21:54,850 This has been in the planning stage for quite some time 262 00:21:54,850 --> 00:22:02,310 two, it really, location is really important, and as to where this would be located, it kind 263 00:22:02,310 --> 00:22:08,850 of provides that system of each of the cardinal directions having adequate parking resources. 264 00:22:10,210 --> 00:22:23,130 Three, it provides support for downtown businesses who are, as mentioned, a large part of the 265 00:22:23,130 --> 00:22:29,170 reviewed in the larger economic development context that this is an important investment in infrastructure 266 00:22:29,690 --> 00:22:37,530 that will continue to encourage tax dollar growth and revenue growth from the businesses 267 00:22:37,530 --> 00:22:43,930 that we represent. And then finally, it is kind of the opportunity to continue on that larger 268 00:22:43,930 --> 00:22:50,050 plan. As we've seen in the discussions, there will be additional parking areas that will need 269 00:22:50,870 --> 00:22:55,290 maintenance and refurbishment, as well as the streetscape work that's going to be 270 00:22:55,290 --> 00:23:01,330 needed done that it's going to actually take parking spots out of rotation while those 271 00:23:01,330 --> 00:23:05,950 projects are being completed. I think it's important that we provide this additional capacity 272 00:23:05,950 --> 00:23:12,350 prior to some of these other activities that we're limiting parking downtown. And they're 273 00:23:12,350 --> 00:23:16,910 respectfully just on the accelerating of the timeline. It's really just two points that I wanted 274 00:23:16,910 --> 00:23:24,910 make, as I mentioned, as construction projects occurred downtown, it takes a parking out of 275 00:23:24,910 --> 00:23:25,270 play. 276 00:23:26,870 --> 00:23:30,530 And so, and with additional refurbishment going to be other decks, it's going to be important 277 00:23:30,530 --> 00:23:38,590 to have that capacity, so there's not an awkward phase of not having the mobile parking. 278 00:23:39,210 --> 00:23:41,130 And then two, just the cross factor. 279 00:23:41,410 --> 00:23:46,890 I mean, when this was initially proposed, it was somewhere in the neighborhood of 18.0 point 280 00:23:46,890 --> 00:23:57,190 9 million. Now we're looking at 30 to 36 million with CIP, putting it at 37.7. The longer we delay 281 00:23:57,190 --> 00:24:01,710 this project, the more it's going to ultimately cost our taxpayers. So I would encourage that we move 282 00:24:01,710 --> 00:24:07,690 forward with the nickel structure as expeditiously as possible. And here are to answer any questions 283 00:24:07,690 --> 00:24:08,650 if you need me. 284 00:24:11,930 --> 00:24:14,650 Thank you. Any council members have an item for the public 285 00:24:14,650 --> 00:24:19,210 form portion of the Councilmanals are. Thank you, Mayor. I had questions for first Mr. Doyle, 286 00:24:19,590 --> 00:24:25,270 and then I was going to ask some questions to the last three speakers as well. Probably 287 00:24:25,270 --> 00:24:32,910 easy answers from staff, so I'll turn to Mr. Krieger and I know Mr. Doyle said that the city 288 00:24:32,910 --> 00:24:38,550 last took on debt to support the electric utility in 2011 and he was just wondering what the 289 00:24:38,550 --> 00:24:41,790 change in philosophy was that we're starting to do that again. Would you, do you mind answering 290 00:24:41,790 --> 00:24:42,570 on his career. 291 00:24:43,410 --> 00:24:44,330 Yeah, certainly no problem. 292 00:24:45,130 --> 00:24:48,790 You know, we look at that with each individual rate study. 293 00:24:49,290 --> 00:24:58,890 We have had debt issuances included subsequent to 2011 or planned debt issuance included 294 00:24:58,890 --> 00:24:59,630 in rate study. 295 00:25:00,000 --> 00:25:05,100 The meeting in 2011, when we came around and looked our caste physicians saying, hey, you know what? We 296 00:25:05,100 --> 00:25:12,540 can continue operating without issuing the debt, so that is kind of at least for us as better. 297 00:25:12,540 --> 00:25:21,800 Our financing of last resort. What we're mostly doing is simply balancing rates with debt load and Titanic keyed to cash above zero. 298 00:25:21,840 --> 00:25:28,300 Okay, I say—if I may blow them there—no need for you to have an answer tonight, unless you have one ready. 299 00:25:28,300 --> 00:25:41,160 But one thing I would like to know maybe to future presentation would be what kind of impact it will have on rates to be taking on the first step that we've taken on in 15 years is kind of causing increase in rates. 300 00:25:41,660 --> 00:25:48,580 Just to be clear, this is not the general fund is not going to pay down that debt later. That's the electric fund will pay a correct 100 percent. 301 00:25:48,580 --> 00:26:16,680 Okay, the last thing I wanted to ask is a follow up to Mr. Doyle's point was he had stated that about two thirds of the electric cost was accounted for in the presentation. I think there was like a ten or eleven million dollar delta and he's speculated that maybe it was the run rate. I guess that would cover that. Do you need time to look into that or yeah, you know, I'd like some time to look you know, I think it is kind of a just our normal replacement programs. 302 00:26:16,680 --> 00:26:23,540 you know cable overhead poles such but it will be very simple for us simply to provide 303 00:26:23,540 --> 00:26:28,020 the reconciliation from the 30 million to like the 40 million dollars total and get 304 00:26:28,020 --> 00:26:28,780 that out to council. 305 00:26:29,280 --> 00:26:29,440 All right. 306 00:26:29,560 --> 00:26:29,980 Thank you. 307 00:26:30,140 --> 00:26:34,800 And then Mayor, if I may ask, Ms. Wood, but some questions and then anyone else in the group 308 00:26:34,800 --> 00:26:41,920 who spoke about the parking deck you feel free to say anything that's responsive to when 309 00:26:41,920 --> 00:26:42,720 I'm going to ask about. 310 00:26:42,720 --> 00:26:47,560 So, as I understood at the asks for keeping a close design moving forward, readjust priorities 311 00:26:47,560 --> 00:26:52,640 of the streetscape of necessary and reconsider our use of the downtown parking dollars 312 00:26:52,640 --> 00:26:53,200 to the municipalities. 313 00:26:53,700 --> 00:26:53,760 Correct. 314 00:26:54,180 --> 00:26:54,400 Correct. 315 00:26:55,000 --> 00:26:55,120 Okay. 316 00:26:55,580 --> 00:26:59,480 And I will say generally, I'm fairly sympathetic to those three asks. 317 00:26:59,740 --> 00:27:06,860 I mean, a big thing that I've, you know, I've voted on numerous CIPs in the last few 318 00:27:06,860 --> 00:27:10,960 years where this was kind of anticipated and it seems like there's a lot of last minute 319 00:27:10,960 --> 00:27:17,120 change, as municipal tech has been prioritized, I will say though that from my perspective 320 00:27:17,120 --> 00:27:22,480 there was a significant new ask in the letter that I saw and maybe in some of the discussions 321 00:27:22,480 --> 00:27:27,340 we had at DNA, which is that we're now looking to have a high capacity garage possible. 322 00:27:27,940 --> 00:27:30,800 Can you provide any more commentary on what the thinking is there? 323 00:27:32,240 --> 00:27:37,920 In our discussions with different groups, the thought was if we're going to do this, let's 324 00:27:37,920 --> 00:27:40,340 get the maximum parking out of it. 325 00:27:40,600 --> 00:27:44,080 And when we first design the parking deck back in 2008, 326 00:27:44,140 --> 00:27:46,800 I believe that there were some accommodations made 327 00:27:46,800 --> 00:27:51,320 in certain areas to beautify the parking deck 328 00:27:51,320 --> 00:27:52,380 as much as possible. 329 00:27:52,600 --> 00:27:55,340 And taking another look now 20 years later, 330 00:27:56,100 --> 00:27:58,260 do we need a lot of those enhancements? 331 00:27:58,300 --> 00:27:59,960 If there is a park, let's say, 332 00:28:00,220 --> 00:28:02,140 can that be better utilized as parking? 333 00:28:02,400 --> 00:28:03,200 Is an example? 334 00:28:03,940 --> 00:28:06,780 So I think that was the event of trying to get 335 00:28:06,780 --> 00:28:11,780 the maximum use out of that space we can, you know, some meetings, 336 00:28:11,880 --> 00:28:15,920 admittedly said, boy, can we go taller, using the van beer and parking deck 337 00:28:15,920 --> 00:28:16,520 as the model. 338 00:28:16,780 --> 00:28:19,980 The years ago, we built, I think that was supposed to be a three-level deck, 339 00:28:20,300 --> 00:28:23,140 and it was some of your former city council members that said, no, 340 00:28:23,140 --> 00:28:25,600 let's go higher, and we did that, that was a smart move. 341 00:28:26,740 --> 00:28:31,740 So I think it's just, let's get back to the design and let's see what we can do, 342 00:28:31,980 --> 00:28:35,140 but every 20 years later since that design was done, almost. 343 00:28:35,140 --> 00:28:37,700 and see what we could do to optimize parking. 344 00:28:38,160 --> 00:28:39,180 Does that help? 345 00:28:39,320 --> 00:28:40,380 That's extremely helpful. 346 00:28:40,800 --> 00:28:43,380 So I would just, for my one council member speaking 347 00:28:43,380 --> 00:28:46,760 for myself, like I said, I'm sympathetic to the three 348 00:28:47,960 --> 00:28:51,300 asks, they're in line with what was in the CIP before 349 00:28:51,300 --> 00:28:54,680 in prior years, a couple of things 350 00:28:54,680 --> 00:28:56,940 that are just kind of must-have for me, 351 00:28:58,040 --> 00:29:00,240 are bikeability, walkability, and downtown, right? 352 00:29:00,240 --> 00:29:04,040 Because if we get a customer in downtown on a bike path 353 00:29:06,340 --> 00:29:09,560 or feeling more safe to walk that is just as valuable 354 00:29:09,560 --> 00:29:12,100 having some apart downtown and what shoppers downtown, 355 00:29:12,480 --> 00:29:15,820 or people downtown, not just drivers downtown. 356 00:29:16,480 --> 00:29:19,460 So that's one thing that's like we absolutely have to be 357 00:29:19,460 --> 00:29:21,060 prioritizing that at the same time. 358 00:29:21,680 --> 00:29:23,520 The other one is just as a suggestion 359 00:29:23,520 --> 00:29:25,140 as somebody who talks to residents 360 00:29:25,140 --> 00:29:26,840 that's our job to be the voice of residents. 361 00:29:27,400 --> 00:29:31,980 My guess is if the push in the next year is to go a story higher 362 00:29:31,980 --> 00:29:37,120 And then what was on the previous elevations, my guess is that is going to result in community 363 00:29:37,120 --> 00:29:42,840 pushback that that just makes this project go years, years out into the future. 364 00:29:43,100 --> 00:29:48,520 That's one council member's take, I throw it out there, but as we further discuss this 365 00:29:48,520 --> 00:29:51,280 over the next couple of meetings, I just might be back. 366 00:29:51,480 --> 00:29:51,820 Thank you, Mayor. 367 00:29:52,600 --> 00:29:52,860 Thank you. 368 00:29:53,060 --> 00:29:53,500 Councilman White. 369 00:29:53,700 --> 00:29:54,660 I appreciate that. 370 00:29:55,240 --> 00:29:56,080 That's a true. 371 00:29:57,740 --> 00:29:59,680 I know Chris might ahead of him. 372 00:30:00,940 --> 00:30:08,600 If you ask one question, it's okay. Sure. May Chris, did you have follow-up to what Mr. Chair said? 373 00:30:08,600 --> 00:30:16,160 I just wanted to add to Katie's comments and you asked about, I think most of the talk of adding a story or maximizing 374 00:30:16,160 --> 00:30:26,440 came out of feedback from others, not this wasn't from us saying, I, as a business owner, property owner, resident of downtown, 375 00:30:26,440 --> 00:30:33,520 I live right across from where North Central just built the parking, the villian, we weren't 376 00:30:33,520 --> 00:30:34,200 asking for that. 377 00:30:34,280 --> 00:30:38,200 We were just taking that as feedback people saying, have you maximized it? 378 00:30:38,200 --> 00:30:42,700 Are you looking at the best ways to minimize cost per spot? 379 00:30:43,720 --> 00:30:50,600 We as the DNA and aren't weren't coming saying at a fourth story maximizes this thing, let's 380 00:30:50,600 --> 00:30:51,040 go big. 381 00:30:51,140 --> 00:30:52,400 That was not our request. 382 00:30:56,490 --> 00:31:05,250 Thank you, and a few comments and thanks for the, for everyone in the public coming out to speak on this. 383 00:31:06,690 --> 00:31:12,390 You know, I kind of look at our downtown as that as the anchor to the city. 384 00:31:12,650 --> 00:31:17,370 It's almost like putting in a Walmart at a big shopping center and a Walmart becomes the anchor. 385 00:31:17,650 --> 00:31:21,970 And I say that because I get a, some pushback and I live in South Naperville. 386 00:31:21,970 --> 00:31:25,790 and I get people in South and Aprilville that we, well, why aren't we doing something in South 387 00:31:25,790 --> 00:31:32,550 and Aprilville? And trust me, there's all areas of the community, North and South, I think 388 00:31:32,550 --> 00:31:38,490 should all be considered. But I think, with the downtown, it tends to bring in people from 389 00:31:38,490 --> 00:31:44,570 outside, we have the data to show that. And the rest of the city tends to benefit from that, 390 00:31:44,570 --> 00:31:48,790 because they're not going to just visit the downtown, they're going to go other places as well. 391 00:31:48,790 --> 00:32:12,490 So I do appreciate that, but one question for, well, to that point, so I would support trying to get that parking deck in there because of all the reasons that we're explaining up here, I think it's a good thing as far as allowing those businesses to have customers that find parking that's convenient for them to go and shop. 392 00:32:12,490 --> 00:32:19,310 And in my opinion, I think there's this parking in the downtown, but it's just not conveniently located. 393 00:32:20,010 --> 00:32:22,610 And I think we end up missing out on opportunities for businesses. 394 00:32:23,750 --> 00:32:32,350 Now, understand Mr. Krieger's focus is now on the municipal deck, and that was news to me when I heard about it. 395 00:32:33,070 --> 00:32:39,770 Yes, it was. And I believe Mr. Randolph will have more on this, but it was a result of kind of a condition assessment. 396 00:32:39,770 --> 00:32:50,350 And you know, that is municipal deck is now, I guess, 35 years old and, you know, has 397 00:32:50,810 --> 00:32:53,690 were entering some structural maintenance that needs to be conducted. 398 00:32:55,530 --> 00:32:59,330 I know that we did not have it in the last year's CIP. 399 00:33:00,270 --> 00:33:06,010 I believe it was moved up because of the condition assessment. 400 00:33:06,210 --> 00:33:07,510 Is that fair, Mr. Randolph? 401 00:33:10,880 --> 00:33:21,960 Walker consulting in 2022 recommended a rehabilitation of the DAC that's essentially the water proofing membrane that's in between the two different slabs of concrete. 402 00:33:23,320 --> 00:33:36,270 I don't recall when it was first introduced to the CIP but Walker was back this summer or earlier this year and did another visual structural inspection of all of our DACs and confirmed that we should move forward at that. 403 00:33:37,330 --> 00:33:57,090 Okay, now I know we did a few improvements down there and a couple years ago, I know we painted the entire flooring on the deck and so on, so I'm hoping that all that didn't go to waste because now we're going to have to go and do all this construction to read. 404 00:33:57,090 --> 00:34:02,870 Yes, I was on the board level, we're talking about the what's currently in the CFP is for the upper level. 405 00:34:03,770 --> 00:34:06,690 Okay, so all that work we did before go to go to waste. 406 00:34:07,190 --> 00:34:08,390 Correct. Okay, good. 407 00:34:09,310 --> 00:34:11,510 Thanks and a couple of other questions. 408 00:34:12,430 --> 00:34:17,130 On the battery that Mr. Hus got up to discuss. 409 00:34:18,370 --> 00:34:20,170 Any update on that, Mr. Krieger? 410 00:34:20,590 --> 00:34:20,750 Sure. 411 00:34:21,370 --> 00:34:22,810 And I've been in there a little bit. 412 00:34:22,810 --> 00:34:30,450 I will tell you if we have since had discussions with IMEA, why do we have discussions with 413 00:34:30,450 --> 00:34:30,570 them? 414 00:34:32,930 --> 00:34:37,570 Because we are currently in a full requirements contract with them, therefore they need to 415 00:34:37,570 --> 00:34:38,130 play a role. 416 00:34:38,390 --> 00:34:43,570 You know, it doesn't mean that they have full control, but we have looked over the financials 417 00:34:43,570 --> 00:34:52,210 and in this case, if we were simply buying on the market without any assets, a battery makes 418 00:34:52,210 --> 00:34:59,070 tons of sense. If you are hedged with generation assets, both the energy and capacity side, 419 00:34:59,070 --> 00:34:59,950 it makes 420 00:35:00,000 --> 00:35:14,120 Lessons, as a member of IMEA, there are about 100% hedged, meaning that there's ownership in either generation or contracts that cover all of the need, 421 00:35:16,900 --> 00:35:22,000 the real benefit you get from battery really comes down to. 422 00:35:22,000 --> 00:35:29,960 frequency regulation is one, although the value of that has been diminishing, really, just kind 423 00:35:29,960 --> 00:35:38,160 of your biggest piece would be kind of like the arbitrage. So by when prices are low, or charge it 424 00:35:38,160 --> 00:35:46,420 up on price are low and discharge it when prices are high. With our current contract, whether we 425 00:35:46,420 --> 00:35:57,060 use a kilowatt at 6 a.m. or 7 p.m. which is our peak time. We pay the same price. So that kind of eliminates that. 426 00:35:57,360 --> 00:36:06,920 It helps but to a much lesser scale. Because it will help IMEA reduce their total peak load. 427 00:36:07,380 --> 00:36:14,260 So it will reduce their capacity needs but to a much lesser extent than if we were buying directly on the market. 428 00:36:14,260 --> 00:36:23,380 So the information we got from the sales folks and I made the statement that says, 429 00:36:23,480 --> 00:36:28,140 oh, you know what this thing's going to pay itself off in three years was a great sales pitch, 430 00:36:29,120 --> 00:36:33,260 but would not work for us until after 2035. 431 00:36:33,260 --> 00:36:49,400 There is still, I mean, is still looking at a pilot in Napervilla still as a consideration for their PGM pilot for a battery and, you know, our hope is that that's going to play out. 432 00:36:50,100 --> 00:36:54,140 I mean, I'm just looking at it just in the simplest of terms. 433 00:36:56,060 --> 00:37:02,260 We would charge, we're going to use IMEA, what we currently use to charge the battery. 434 00:37:03,640 --> 00:37:06,520 So we're already using that contracted energy. 435 00:37:06,780 --> 00:37:15,450 So once we store it in a battery, I'm just kind of dumbfounded why they even have a 436 00:37:15,450 --> 00:37:21,030 so and what we do it, the energy that comes out of the battery at that point, because we've 437 00:37:21,030 --> 00:37:23,790 already bought the energy from them to fill up the battery. 438 00:37:24,390 --> 00:37:28,550 Right, right, it's really kind of the way the contract is worded. 439 00:37:29,110 --> 00:37:36,310 And if you do have one hundred percent or near one hundred percent hedging, the additional 440 00:37:36,310 --> 00:37:42,130 capacity you get, you can't, you're less like you're less able to leverage that because 441 00:37:42,130 --> 00:37:47,270 will always have to be sold into the market instead of avoiding a cost that you normally would 442 00:37:47,270 --> 00:37:53,570 have had for the capacity. Yeah, I mean, if we put a battery and charged it up, that would 443 00:37:53,570 --> 00:38:01,490 be full requirements coming into IMA and we would be purchasing that. When we discharged it, 444 00:38:02,910 --> 00:38:10,130 the way the contract is written, we would not be paying them for all of the energy that 445 00:38:12,750 --> 00:38:21,450 We required because we would be using the stuff we set aside for the battery and that, you know, that currently would be in conflict with the contract. 446 00:38:21,990 --> 00:38:27,330 You know, my guess is that they would be reasonable and we continue to have discussions with them. 447 00:38:28,710 --> 00:38:37,410 We're not at a point yet with the new scenario where we can kind of give you a payback, but we believe it is going to be north of 10 year. 448 00:38:37,410 --> 00:38:42,730 That doesn't mean we don't do it, but I want to make sure that I have all the facts before we bring it to you. 449 00:38:43,270 --> 00:38:50,930 Just because it is not in the CIP at this point in time does not mean it would not be something that we would do in 2027. 450 00:38:51,910 --> 00:38:55,550 But we would only bring it as a staff recommendation if we thought it made sense. 451 00:38:56,690 --> 00:39:01,590 And regardless, we will bring the results of that to Council, whether it makes sense or not. 452 00:39:01,590 --> 00:39:11,770 And all that takes into consideration, if we were to put it back into the market through PJM basically. 453 00:39:13,630 --> 00:39:21,770 There is a PJM that was given the, I don't know, a rack or bonuses to communities that have the batteries. 454 00:39:21,770 --> 00:39:32,810 Yes, PJM will provide credits for people who have the batteries just because it makes the whole system better and more resilient. 455 00:39:35,290 --> 00:39:42,930 However, financially those would, those would have to run through IMEA before they came to us. 456 00:39:43,130 --> 00:39:49,970 It doesn't mean the values really diminished. It just means that because it is a fall requirements contract, it means you run through that. 457 00:39:49,970 --> 00:39:52,250 Okay, and just one more question. 458 00:39:54,190 --> 00:39:58,910 The talk about what Mr. Doyle mentioned about the finances and the borrowing and so on. 459 00:39:59,450 --> 00:39:59,950 And maybe he... 460 00:40:00,000 --> 00:40:08,740 It was being more specific toward the electric utility from a borrowing standpoint, but I do recall during a COVID when the rates were like really cheap. 461 00:40:09,260 --> 00:40:16,140 We were looking at taking advantage of borrowing at that time, just because the rates were so cheap. 462 00:40:16,420 --> 00:40:18,220 Any, can you kind of fill us in on that? 463 00:40:18,380 --> 00:40:23,360 Yeah, absolutely. We kind of take a holistic approach to it. 464 00:40:23,360 --> 00:40:39,440 If money's cheap, which, you know, five, six years ago, it absolutely was, we've just kind of finished up, boy, at least a decade, almost two decades worth of very cheap rates. 465 00:40:39,780 --> 00:40:52,440 And as a AAA rate of community, we pay very little. We're not allowed to make any money on that, but our first choice, if we have the cash available, is to issue no debt. 466 00:40:52,440 --> 00:41:00,020 even as a low percentage. And we've been very fortunate over the years to not have to 467 00:41:00,020 --> 00:41:06,300 issue debt for utility because utilities typically very capital intensive. And therefore also 468 00:41:06,300 --> 00:41:13,060 typically very debt heavy. And we have avoided that by historically charging slightly higher rates 469 00:41:13,060 --> 00:41:14,680 so that we could issue less debt. 470 00:41:16,770 --> 00:41:21,980 Okay. Thank you. Kind of a little bit Jane. Thank you, Mayor. 471 00:41:24,120 --> 00:41:35,580 If I could pose a question to Mr. Kruger for the battery question again, if my understanding 472 00:41:35,580 --> 00:41:41,180 or memory is correct around this time and discussions with Director Grath, he had mentioned 473 00:41:41,180 --> 00:41:48,640 that batteries were more affordable right now and that this was the time to make those purchases. 474 00:41:50,200 --> 00:42:01,040 So, given that, I guess, how might we use this opportunity, or is there a way for us to work this in? 475 00:42:02,340 --> 00:42:07,260 You know, I think that there will be, and I think it's a great opportunity. 476 00:42:07,720 --> 00:42:13,740 He's absolutely right, you know, battery-placed prices over the last five years have plummeted. 477 00:42:14,800 --> 00:42:21,640 And, you know, as well as kind of efficiency gains in them have improved significantly as well, 478 00:42:22,140 --> 00:42:29,000 which means that during a charged, charged cycle, you lose less a smaller percentage 479 00:42:29,760 --> 00:42:34,420 just through like normal losses, so it absolutely is becoming more efficient. 480 00:42:36,820 --> 00:42:41,520 And I wish I had it today, kind of like the financial analysis that shows what it would look like, 481 00:42:41,520 --> 00:42:51,660 But right now, based on what I know, I believe it would require slightly higher electric 482 00:42:51,660 --> 00:42:55,100 rates on our part to cover the debt services associated with the battery. 483 00:42:55,920 --> 00:43:01,120 But I feel it's my obligation to prove that to you and because it's your decision. 484 00:43:04,960 --> 00:43:10,220 Another question I had was from Mr. Malone regarding the parking deck. 485 00:43:10,220 --> 00:43:17,100 You had mentioned that we may have started with an estimate of 18 million for that parking 486 00:43:17,100 --> 00:43:22,420 deck and that we have moved towards 37 million, about or 36 million. 487 00:43:23,440 --> 00:43:29,380 Is that increased due to materials and labor costs or are there other aspects that change? 488 00:43:30,000 --> 00:43:31,600 I think there are other aspects to that. 489 00:43:31,640 --> 00:43:36,680 I mean obviously time value of money, but construction costs are going up across industry 490 00:43:36,680 --> 00:43:39,680 And as materials become more and more expensive, 491 00:43:41,180 --> 00:43:46,320 you know, part of that is dollars in 2026 are less valuable 492 00:43:46,320 --> 00:43:47,980 than they were in 2007. 493 00:43:48,700 --> 00:43:52,220 Yeah. I just wanted to clarify if that was the key 494 00:43:52,220 --> 00:43:56,760 different or was it the design differences to, 495 00:43:56,780 --> 00:44:00,760 to ensure based on the feedback of the residents in that area. 496 00:44:02,180 --> 00:44:05,520 Could that be also prior to my time with the chamber, 497 00:44:05,520 --> 00:44:07,580 So I believe so. 498 00:44:10,400 --> 00:44:11,600 I'm just a trigger. 499 00:44:12,560 --> 00:44:12,920 Thank you. 500 00:44:13,140 --> 00:44:23,720 No, the design elements were all include like with the pocket park and the Plaza and the kind of gingerbread touches. 501 00:44:24,040 --> 00:44:26,100 Those were included in the initial estimate. 502 00:44:26,580 --> 00:44:29,740 So it was all simply inflationary increases. 503 00:44:30,580 --> 00:44:31,520 Thank you. 504 00:44:31,520 --> 00:44:33,640 I'll zoom in at room. 505 00:44:34,260 --> 00:44:34,620 Thank you, Mayor. 506 00:44:36,820 --> 00:44:47,200 First, just a, you know, my experience on the financial advisory board just to add a little bit of context and maybe relates to this dead discussion as it falls around the utility. 507 00:44:49,020 --> 00:44:59,940 You know, for many years, and Mr. Crier, you can maybe highlight this, but that Mayor Cherico is here, there was a big debt reduction move. 508 00:45:00,000 --> 00:45:24,420 It was a big concern that the city had too much debt and went on a campaign and used a lot of cash to really kind of clean things up and to the point where maybe there was an argument where some infrastructure was neglected, that we could use cash on and maybe we went a little too far and got a little too conservative on our willingness to use that. 509 00:45:24,420 --> 00:45:28,740 I think everybody understands if there's capital that we're spending right now, that's going 510 00:45:28,740 --> 00:45:32,860 to benefit a future generation that makes sense. 511 00:45:33,520 --> 00:45:38,620 So in that previous rate study, I believe the financial advisory board actually encouraged 512 00:45:39,180 --> 00:45:45,660 director Monch at the time to issue debt and levelize those rates a little bit. 513 00:45:47,060 --> 00:45:53,320 So I'm in my personal life, I'm not a fan of debt, but it should and it could be used properly 514 00:45:53,320 --> 00:45:57,460 and maybe we weren't utilizing it to the extent that we should have at times. 515 00:45:58,840 --> 00:46:01,160 So I want to go back to the parking deck. 516 00:46:01,280 --> 00:46:06,260 I think a lot of us are maybe a little bit surprised to recently hear about the 517 00:46:06,260 --> 00:46:07,340 parking municipal parking deck. 518 00:46:07,480 --> 00:46:12,620 I had to hear from a business owner, so I did call Director Galloway. 519 00:46:12,780 --> 00:46:15,760 We had a conversation about it. 520 00:46:15,780 --> 00:46:18,220 You know, I do see the parking deck as an investment. 521 00:46:18,760 --> 00:46:22,860 It's not just building the parking deck and I think there's a return on that 522 00:46:22,860 --> 00:46:23,480 investment. 523 00:46:26,500 --> 00:46:32,280 And maybe if you could kind of our conversation, you, my understanding, it really 524 00:46:32,280 --> 00:46:40,340 wasn't a capacity thing from a standpoint. It was more of a logistical. But 30 days ago, 525 00:46:40,440 --> 00:46:52,840 the municipal deck, it wasn't in our conversations when we were meeting with DNA. So this is a 526 00:46:53,420 --> 00:46:54,820 So, a couple things. 527 00:46:55,560 --> 00:47:00,820 The engineering or getting the new plans is, we are in clean that in the 227ers. 528 00:47:01,000 --> 00:47:04,340 That is that moved off as well. 529 00:47:05,420 --> 00:47:12,480 You know, that moves off, I think either Mr. Hanger, Ms. Loudon, will be able to give you a little more detail around the specific timing. 530 00:47:14,000 --> 00:47:14,120 Sure. 531 00:47:14,300 --> 00:47:21,600 So, with regard to the Nichols Jack, the proposal that we have in the slides tonight that we're going to go over includes, 532 00:47:21,600 --> 00:47:29,720 essentially concept design remaining for the Nickels Jack in 2027 and then pushing out the actual 533 00:47:29,720 --> 00:47:34,940 detailed design for the construction document that we would need for bidding. That pushes 534 00:47:34,940 --> 00:47:40,600 that out a few years to align it with construction coming after the next stages of streets gave 535 00:47:40,600 --> 00:47:48,420 an after the municipal Jack. So the reason that we proposed keeping money into continue design in 536 00:47:48,420 --> 00:47:52,780 of concept was because of some of the feedback that had been related to us from the meetings that 537 00:47:52,780 --> 00:47:56,280 were had where there's questions around the design. You know, does it need all the aesthetics, 538 00:47:56,580 --> 00:48:02,960 do we need the pocket part, can we forego the underground portions, could we go higher? 539 00:48:03,840 --> 00:48:09,300 You know, if we're committed to the design as it is, we could skip that phase and go straight to 540 00:48:09,300 --> 00:48:14,500 beginning preparation of construction documents for bidding. But if we want to investigate any 541 00:48:14,500 --> 00:48:18,880 those questions, we would want to bring a parking expert on board to evaluate some of those 542 00:48:18,880 --> 00:48:22,660 potential cost saving measures and things that would make the deck more cost efficient. 543 00:48:23,740 --> 00:48:30,060 So concept design in this budget, that's quite different than getting full engineering designs, 544 00:48:30,500 --> 00:48:34,060 right? Correct. And the numbers a lot bigger, right? The difference? 545 00:48:36,040 --> 00:48:41,760 What was first engineering? Yeah. So we kept the same amount for engineering as we would expect 546 00:48:41,760 --> 00:48:47,580 we've made, we just pushed that out and then added that 100,000 in for the concept phase. 547 00:48:49,520 --> 00:48:59,640 But what's changed is the timeline of construction instead of, yes. 548 00:49:01,240 --> 00:49:04,240 So for the past several years where we've slaughtered these within the Capital Improvement 549 00:49:04,240 --> 00:49:10,740 Program and through our conversations with Dak and DNA and NDP has assumed that we would 550 00:49:12,340 --> 00:49:16,820 basically dust off the old plans, fix them up a little bit, and move on to construction. 551 00:49:17,600 --> 00:49:22,780 So as we started to take a look further, we did begin to understand after having a courtesy 552 00:49:22,780 --> 00:49:26,820 conversation with some deck experts that we would need to do a little bit more robust 553 00:49:26,820 --> 00:49:30,420 design on those plans to bring it up to current building codes, which is where that costing 554 00:49:30,420 --> 00:49:33,160 crease comes in so that we'll take a little bit more time. 555 00:49:34,100 --> 00:49:40,580 And then as more of the conversations started to come around with questions regarding the design 556 00:49:40,580 --> 00:49:46,040 elements, height, park, aesthetic features, that's where we felt like that's going to take us 557 00:49:46,040 --> 00:49:50,720 more time. If we want to reopen those conversations, we're going to need a lot more time to prepare 558 00:49:50,720 --> 00:49:51,480 that design. 559 00:49:53,620 --> 00:49:59,600 Okay, so in the extending this timeline, is this a staff capacity thing or is it 560 00:49:59,600 --> 00:49:59,860 just 561 00:50:01,600 --> 00:50:13,680 It's a lot of both. Logistically, I do not recommend that we conduct major streetscape projects and multiple projects at a time. I think that's just too much impact on the downtown. 562 00:50:14,180 --> 00:50:20,300 That does require a lot of staff time if those are the priorities we can allocate the staff and adjust other priorities accordingly. 563 00:50:21,080 --> 00:50:26,120 But I really think it's more of a logistics impact to the downtown that we're concerned with. 564 00:50:26,120 --> 00:50:28,200 Okay, thank you. 565 00:50:28,680 --> 00:50:29,320 Councilman Wilson. 566 00:50:31,750 --> 00:50:32,050 Thank you, Mayor. 567 00:50:33,570 --> 00:50:41,750 So we had the PUAB board meeting this past Thursday and the discussion around rates was brought up. 568 00:50:41,750 --> 00:50:47,150 We got the report from the Finance Department looking at it. Sorry, sorry if this was sort of been talked about. 569 00:50:48,630 --> 00:50:56,790 But with the rate recommendation changes that were brought seem to line up with the electric charges. 570 00:50:57,750 --> 00:51:03,110 at least year-to-date and from the variance from 2025 from last year obviously 571 00:51:03,110 --> 00:51:11,910 sends the debt that was occurred but they seemed to line up and the question was 572 00:51:11,910 --> 00:51:17,090 brought up to mayor I don't know if Tracy if you have any comment on the see 573 00:51:17,090 --> 00:51:25,810 there but the question as far as like subcitation subcities and rates as far as 574 00:51:25,810 --> 00:51:33,170 goes go how those occur and if both of them are remembering this, right and not to put 575 00:51:33,170 --> 00:51:41,910 hopefully I'm not putting words in Mayor's mouth here, but from what he had said, there may 576 00:51:41,910 --> 00:51:49,930 be variants as months to month, but actual, at the end of the year and I know director career 577 00:51:49,930 --> 00:51:54,830 you've talked about this before, where things may change months to months, but at the end 578 00:51:54,830 --> 00:52:04,650 the day at the end of the year, then we may be short or ahead based on people's purchases, 579 00:52:04,970 --> 00:52:12,230 purchase of electricity, or if we're not ahead of our debt, then we may need to issue 580 00:52:12,970 --> 00:52:20,890 our purchase debt, which is kind of what happened. And the discussion around not raising rates for 581 00:52:20,890 --> 00:52:29,550 some time had was brought up as well and what had happened last year as far as rate increases 582 00:52:29,550 --> 00:52:34,870 as well. Is that an accurate representation, Dr. Krieger? 583 00:52:35,430 --> 00:52:38,030 Yeah, I think that's a fair assessment. 584 00:52:40,130 --> 00:52:44,570 We strive from one rate study period until the end 585 00:52:44,570 --> 00:52:50,730 of the following one. We look at where we're going to be three years at the end here. 586 00:52:50,730 --> 00:52:57,190 knowing that you're going to have some years better than, better than, anticipate in some 587 00:52:57,190 --> 00:53:04,210 years worse. And yeah, I mean, for this three year period, we're actually tracking fairly 588 00:53:04,210 --> 00:53:11,350 close. You know, a lot of it, probably the greatest variable we have, you know, frankly, without 589 00:53:11,350 --> 00:53:19,590 a major customer ad or loss is really weather. And, you know, that's very difficult to predict. 590 00:53:20,650 --> 00:53:21,690 Thank you. 591 00:53:24,100 --> 00:53:24,160 All right. 592 00:53:24,320 --> 00:53:29,120 I'm going to reserve my comments for getting the parking garage and the funding source for 593 00:53:29,120 --> 00:53:35,300 the miserable parking garage for the actual presentation little later on in the slides. 594 00:53:35,580 --> 00:53:42,140 But with regard to the battery technology, we're in a full requirements contract with IMEA. 595 00:53:42,140 --> 00:53:44,480 Batteries are for peak shaving and frequency regulation. 596 00:53:44,860 --> 00:53:49,180 If the city goes out and requires a battery and it does anything that would trigger a peak 597 00:53:49,180 --> 00:54:18,640 to be leaving interpretation by the IMEA, their membership is likely going to say, okay, thanks for subsidizing us, because you can't be shaped without our being a party to this, so I think at this point where we are with the IMEA contract we're pretty locked in unless we decide to reopen negotiations and potentially have the conversation and get something done earlier, but they were pretty clear about where they were with the IMEA prior to our conversations. 598 00:54:20,280 --> 00:54:25,700 All right, so we need to get Councilman Sayed back on the phone, Mr. Krieger, you're getting 599 00:54:25,700 --> 00:54:28,700 to get your presentation queued up, are you ready to go? 600 00:54:31,540 --> 00:54:34,200 Uh, Mr. McCulloch said I'm not quite ready and I need one minute. 601 00:54:34,920 --> 00:54:35,160 All right. 602 00:54:35,560 --> 00:54:36,420 We are ready, Mayor. 603 00:54:36,680 --> 00:54:37,760 You can put it on the screen. 604 00:54:38,080 --> 00:54:38,860 How about that? 605 00:54:44,230 --> 00:54:45,910 Yep, they do that back in the booth also. 606 00:54:46,610 --> 00:54:48,650 Oh, I can do this. Oh, I can do this before everybody. 607 00:54:55,800 --> 00:54:56,600 Councilman Sayed? 608 00:54:57,140 --> 00:54:59,940 Yeah, back live in Council Chambers. 609 00:55:00,050 --> 00:55:02,550 Please hold on for a second. Okay. 610 00:55:12,430 --> 00:55:14,070 All right, we are all set, Mr. Mayor. 611 00:55:14,610 --> 00:55:15,010 Go ahead. 612 00:55:15,730 --> 00:55:18,530 All right, thank you and good evening and everyone. 613 00:55:18,850 --> 00:55:23,190 Tonight is the first of three budget workshops being held to discuss the proposed 614 00:55:23,190 --> 00:55:28,150 2027 operating in the capital budgets. These workshops are an important part of the annual 615 00:55:28,150 --> 00:55:32,270 budget process. They inform the community on how the city will spend tax 616 00:55:32,270 --> 00:55:37,130 dollars and provide all of you with the information necessary to make well informed 617 00:55:37,130 --> 00:55:38,510 financial decisions. 618 00:55:40,190 --> 00:55:45,490 Tonight we'll start with an overview of the city's capital improvement program, more commonly 619 00:55:45,490 --> 00:55:50,710 referred to as CIP, we'll review that this year's progress, and discuss some of the major 620 00:55:50,710 --> 00:55:55,570 areas of investment plan for the next five years, and that will include no review of some 621 00:55:55,570 --> 00:56:01,250 of the projects we have planned and details on how we intend to fund those projects. 622 00:56:04,160 --> 00:56:08,560 CIP provides a multi-year roadmap for the city's infrastructure and capital needs, rather 623 00:56:08,560 --> 00:56:11,180 than looking at projects one budget year at a time. 624 00:56:11,980 --> 00:56:14,960 These types of projects often have long lead times 625 00:56:14,960 --> 00:56:17,840 in can span several years from initial planning 626 00:56:17,840 --> 00:56:20,000 and design through construction and completion. 627 00:56:20,920 --> 00:56:22,900 The multi-year approach allows the city 628 00:56:22,900 --> 00:56:24,400 to look ahead at major investments 629 00:56:24,400 --> 00:56:27,820 anticipate funding needs and better understand 630 00:56:27,820 --> 00:56:29,940 how projects fit together over time. 631 00:56:30,760 --> 00:56:32,340 It also helps staff and council 632 00:56:32,340 --> 00:56:34,640 consider the overall pace and sequencing 633 00:56:34,640 --> 00:56:37,560 of capital investment rather than evaluating 634 00:56:37,560 --> 00:56:44,000 each project in isolation, but we want to stress is just because we look at the CIP and 635 00:56:44,000 --> 00:56:48,660 five-year increments, doesn't mean this is a one-and-done review for council. You will 636 00:56:48,660 --> 00:56:53,160 have multiple checkpoints to review capital projects before significant expenditures occur. 637 00:56:53,860 --> 00:56:59,720 The first opportunity is really tonight. The reason we have a capital workshop before the 638 00:56:59,720 --> 00:57:07,540 proposed budget is published is so that council can discuss priorities, project, timing, scope, and 639 00:57:07,540 --> 00:57:13,000 I give a staff information we need about these major investments so we can adjust as needed and 640 00:57:13,000 --> 00:57:15,500 still have two more workshops for council discussion. 641 00:57:17,300 --> 00:57:21,840 As individual projects move forward, there are additional opportunities to review their 642 00:57:21,840 --> 00:57:26,880 funding contracts and other actions necessary to advance the work during the procurement process. 643 00:57:28,060 --> 00:57:33,360 This process allows council to provide direction as more information becomes available, particularly 644 00:57:33,360 --> 00:57:38,560 for projects with significant cost, complex designs, and changing circumstances. 645 00:57:40,140 --> 00:57:44,340 So inclusion in the capital program should not be viewed as a single point of approval. 646 00:57:44,900 --> 00:57:50,060 It's part of a broader process that gives council multiple opportunities to evaluate projects 647 00:57:50,060 --> 00:57:52,040 before major expenditures are made. 648 00:57:53,160 --> 00:57:57,700 This flexibility is particularly important for multi-year projects because estimates and 649 00:57:57,700 --> 00:58:03,120 circumstances can change between the time our project is initially planned and when construction 650 00:58:03,120 --> 00:58:08,500 actually begins. This approach allows the city to continue planning for long-term infrastructure 651 00:58:08,500 --> 00:58:14,340 investment while maintaining the flexibility to respond to changing priorities, costs, and 652 00:58:14,340 --> 00:58:15,220 financial conditions. 653 00:58:17,880 --> 00:58:22,160 This year, capital dollars spent in under contract are 11 percent higher 654 00:58:22,160 --> 00:58:28,340 compared to 2025. That improvement in spending is largely driven by projects within the 655 00:58:28,340 --> 00:58:31,600 electric water utilities along with Ted. 656 00:58:32,180 --> 00:58:35,360 We expect to spend roughly $157 million this year, 657 00:58:35,560 --> 00:58:40,060 about 87% of the CIP, with 51% of that work 658 00:58:40,060 --> 00:58:41,260 already under contract. 659 00:58:42,640 --> 00:58:44,580 Work on the reconstruction of Northborough Road 660 00:58:44,580 --> 00:58:48,080 Underpass continues with about $20 million currently 661 00:58:48,080 --> 00:58:48,580 uncovered. 662 00:58:49,220 --> 00:58:52,700 This project's funded 90% by outside resources, 663 00:58:53,180 --> 00:58:55,940 including federal, state, and local partnerships 664 00:58:55,940 --> 00:58:58,280 with Aurora as well as an April township. 665 00:58:59,360 --> 00:59:01,700 At the same time, water is making steady progress 666 00:59:01,700 --> 00:59:04,760 with ongoing work at Springbrook in other capital improvements. 667 00:59:05,820 --> 00:59:08,180 Overall, we're making great progress on projects 668 00:59:08,180 --> 00:59:10,200 that have been and projects that will continue 669 00:59:10,200 --> 00:59:12,280 to be in the budget for many years. 670 00:59:13,460 --> 00:59:15,620 And with that, I'll turn things over to Tracy Morocco 671 00:59:15,620 --> 00:59:18,540 to walk you through what the upcoming CIP looks like. 672 00:59:21,650 --> 00:59:22,250 Thanks Doug. 673 00:59:23,230 --> 00:59:25,350 This slide illustrates how our CIP continues 674 00:59:25,350 --> 00:59:27,490 to shift towards upgrades and replacements 675 00:59:27,490 --> 00:59:31,710 over the past five years, and will continue to do so in the future. 676 00:59:32,550 --> 00:59:37,810 Historically, the CIP has been divided into two major categories, upgrades and replacements, and maintenance. 677 00:59:38,690 --> 00:59:45,390 Projects have fallen to the upgrade and replacement category involved new assets, large-scale replacements of assets at the end of their useful life, 678 00:59:45,670 --> 00:59:50,230 or assets that are being replaced due to external factors such as updated regulatory guidelines. 679 00:59:50,850 --> 00:59:59,710 Water main replacements, the springboard troop implant rehabilitation and North Aurora road are all examples of projects that would be considered an upgrade or replacement. 680 01:00:00,500 --> 01:00:06,900 While most of the city's current capital program falls into this category, we're classifying another group of projects as maintenance. 681 01:00:07,900 --> 01:00:11,000 These are the projects that extend the useful life of existing assets. 682 01:00:11,760 --> 01:00:18,660 Examples include road, bridge and parking deck maintenance programs, along with asset repair and improvement programs in the electric utility. 683 01:00:19,600 --> 01:00:27,060 About 88% of the CIP has allocated upgrades and replacement projects, while the remaining 12% has allocated a maintenance focus projects. 684 01:00:27,060 --> 01:00:32,240 While this split has been relatively consistent over the last few years, we can see this hasn't 685 01:00:32,240 --> 01:00:33,300 always been the case. 686 01:00:34,320 --> 01:00:39,640 As the city continues to age, and as new guidelines are established and new developments 687 01:00:39,640 --> 01:00:44,300 come online, we will continue experiencing a shift towards upgrades and replacements. 688 01:00:47,330 --> 01:00:56,170 The proposed CIP for 2027 totals $211 million, this is 11% higher than the 2026 CIP. 689 01:00:56,170 --> 01:01:01,930 Outside of the utilities, this increases related to the North Aurora road project, the River 690 01:01:01,930 --> 01:01:08,290 Walks' health extension, Hillside Gateway project, and municipal center deck rehab, and 691 01:01:08,290 --> 01:01:09,850 those will be discussed later this evening. 692 01:01:10,710 --> 01:01:14,970 Again, I want to be clear that this number is preliminary and subject to change as we continue 693 01:01:14,970 --> 01:01:16,830 to work through the budget process. 694 01:01:17,590 --> 01:01:21,330 The chart before you shows the areas of the city where investments are being proposed. 695 01:01:21,330 --> 01:01:26,590 As is the case in most years, utility infrastructure projects account for the majority of the 696 01:01:26,590 --> 01:01:29,170 CIP at 60%. 697 01:01:29,170 --> 01:01:36,870 Water makes a 46% or more than $96 million of the proposed CIP, primarily due to upgrades 698 01:01:36,870 --> 01:01:38,110 at Springbrook. 699 01:01:39,090 --> 01:01:42,550 Electric accounts for an additional 14% are nearly $30 million. 700 01:01:44,090 --> 01:01:49,410 Outside of the utilities, the largest area of investment is transportation projects, which account for 701 01:01:49,410 --> 01:01:55,590 of the total CIP. Projects in this space include the continued construction on North Aurora, 702 01:01:56,030 --> 01:02:02,430 the 87th Street Bridge, and various traffic improvements. The remaining 21% is made up of items that include 703 01:02:02,430 --> 01:02:06,190 vehicle placements, technology upgrades, and river walk investments. 704 01:02:09,220 --> 01:02:10,600 Any questions on those first couple 705 01:02:10,600 --> 01:02:18,660 slides before we move on? Seeing none. All right. Moving on to the utilities. First up is the water utility. 706 01:02:18,660 --> 01:02:24,720 As we mentioned earlier, water's capital plan makes up almost half of the overall CIP for next year. 707 01:02:25,200 --> 01:02:31,200 The two main priorities include the multi-year reinvestment in the Springbrook treatment plan and ongoing water main replacements. 708 01:02:32,280 --> 01:02:39,640 The Springbrook site improvements consist of all other projects located at or associated with Springbrook that fall outside the treatment plan process. 709 01:02:40,580 --> 01:02:46,320 Lead Piper placement focuses on replacing the remaining lead service lines located in older parts of the city. 710 01:02:47,940 --> 01:02:53,560 Municipalities require to do these replacements and neighborvo remains on track to complete the work by 2027. 711 01:02:54,540 --> 01:03:02,080 The utility is also focusing on sanitary sewer improvements to help prevent groundwater and storm water from causing sewer backups and homes. 712 01:03:02,740 --> 01:03:10,960 And of course there are other capital projects that may not be aligned with one of these specific priorities but are vital to maintaining the utility's day-to-day operations. 713 01:03:13,500 --> 01:03:19,380 This slide should look familiar to most of you as the Springbrook revitalization has been going on for several years now. 714 01:03:19,660 --> 01:03:24,760 As a quick reminder, this work is driven by permit requirements, capacity needs, and the plants age. 715 01:03:25,700 --> 01:03:31,040 The progress illustrated on the slide is based on the project's timeline rather than dollars spent. 716 01:03:31,840 --> 01:03:37,040 This project began in 2021 and we are just over halfway through it in 2026. 717 01:03:37,680 --> 01:03:43,460 Work on the UB disinfection and Influent Pumps Station Projects is complete, and the South 718 01:03:43,460 --> 01:03:47,460 Plant Grit & Razz Project is expected to be completed in 2027. 719 01:03:49,860 --> 01:03:53,840 Designed has been completed for all projects except one, and much of the plan spending 720 01:03:53,840 --> 01:03:56,520 is for construction over the next five years. 721 01:03:59,440 --> 01:04:03,660 Despite here's the full scope of water's capital spending for next year's budget and beyond. 722 01:04:04,420 --> 01:04:08,840 For 2027, water's total capital investment adds up to $98.8 million. 723 01:04:09,840 --> 01:04:17,940 Approximately one-third of this work is associated with springbroke and the treatment plant with another third going to water distribution work such as water mains. 724 01:04:19,020 --> 01:04:24,840 The treatment plant and water main work continues until 2030 one at a combined total of $241 million. 725 01:04:25,980 --> 01:04:32,160 And as noted earlier, there are many other projects that contribute to the reliability of the utility that must be completed. 726 01:04:33,240 --> 01:04:37,380 Some examples include the rehabilitation of various sanitary sewers and water works. 727 01:04:39,970 --> 01:04:44,990 Here we've outlined some of the improvements coming to our water distribution system, including 728 01:04:44,990 --> 01:04:48,810 five major projects that cover just over six and a half miles. 729 01:04:49,590 --> 01:04:54,690 Work will take place in portions of the Crest Creek, Baye Colony, Olympic Terrace, 730 01:04:58,830 --> 01:04:58,830 and 731 01:04:58,830 --> 01:04:59,950 project is budgeted. 732 01:05:00,000 --> 01:05:10,600 At five million dollars, for half a mile of work. This is higher than the residential placements, as construction on major roadways is more complex and requires increased coordination and traffic control. 733 01:05:11,840 --> 01:05:20,860 These projects alone account for $27 million of waters of CIP. Additionally, we've highlighted some of the other major water distribution projects here. 734 01:05:21,680 --> 01:05:27,820 Two phases of the central elevated tank rehabilitation are budgeted next year for combined total of $3 million. 735 01:05:28,620 --> 01:05:33,040 Phase one involves the construction of piping, a pertinent and a new tank. 736 01:05:33,280 --> 01:05:38,420 While phase two involves the demolition of the existing tank and restoration of, excuse me, of the site. 737 01:05:39,400 --> 01:05:42,760 Two million is budgeted for the west elevated tank and reservoir coding. 738 01:05:43,520 --> 01:05:49,500 This work provides, sorry, this work protects the structure from UV exposure, corrosion, weather and other long-term wear. 739 01:05:49,500 --> 01:05:55,960 An additional $1.7 million in rehabilitation work will cover major maintenance in the city's 740 01:05:55,960 --> 01:05:58,900 eight remaining emergency standby wells. 741 01:05:59,960 --> 01:06:04,500 Finally rehabilitation for both the northwest and southwest waterworks are budgeted for a 742 01:06:04,500 --> 01:06:06,420 combined total of $3.1 million. 743 01:06:07,720 --> 01:06:12,420 Work for these projects includes replacing pumps, piping valves, and automation equipment. 744 01:06:15,280 --> 01:06:17,860 We wanted to make one more point about water main replacement work. 745 01:06:17,860 --> 01:06:21,100 Like Springbrook, this is a highly coordinated process. 746 01:06:21,860 --> 01:06:26,200 We try to ensure that no area of work overlap one another and coordinate with other departments 747 01:06:26,200 --> 01:06:30,020 to make sure we understand their work plans for the coming years. 748 01:06:30,760 --> 01:06:37,480 This is a map of replacements through 231 with work occurring in areas around and north of 75th Street. 749 01:06:40,800 --> 01:06:45,340 Next we'll discuss a few major sanitary collection and pumping projects that will be undertaken. 750 01:06:45,340 --> 01:06:49,920 First is the East Highlands sewer main replacement at $4.3 million. 751 01:06:51,280 --> 01:06:55,760 This replaces the existing sanitary sewer where current rehabilitation work has surpassed 752 01:06:55,760 --> 01:06:56,800 its useful lifespan. 753 01:06:57,740 --> 01:07:02,160 Next is the rehabilitation of the Springbrook Interceptor in the Dragon Lake area of the Springbrook 754 01:07:02,160 --> 01:07:04,820 Forest Preserve, totaling $5.9 million. 755 01:07:05,960 --> 01:07:10,580 The Interceptor is a large sanitary sewer that collects wastewater from various parts of the 756 01:07:10,580 --> 01:07:12,360 city and transports it to Springbrook. 757 01:07:12,980 --> 01:07:17,300 Finally, we have the rehabilitation of deteriorated sanitary service laddorals and old 758 01:07:17,300 --> 01:07:20,960 neighbor bill, also known as the Longwood Subdivision at $2 million. 759 01:07:24,110 --> 01:07:26,070 Any questions on the water, Sergei? 760 01:07:26,390 --> 01:07:26,830 I'm Kelly. 761 01:07:27,610 --> 01:07:28,030 Thank you, Mayor. 762 01:07:28,930 --> 01:07:29,910 Thank you for the presentation. 763 01:07:30,190 --> 01:07:35,650 So far, just a couple of questions on the water items, you know, there's not really much 764 01:07:35,650 --> 01:07:37,650 we can do about any of these. 765 01:07:37,830 --> 01:07:43,250 We don't see them, but things we essentially have to say, yes, I'm just curious if you 766 01:07:43,250 --> 01:07:50,270 book, it's like 10 and 11, just so we kind of keep track over the years. 767 01:07:50,490 --> 01:07:56,990 I'm just curious if the estimated totals were at 198 for Springbrook, is that the estimated 768 01:07:56,990 --> 01:08:01,950 total from when we started the Springbrook projects about five years ago, or is that as 769 01:08:01,950 --> 01:08:08,110 of today with inflation, or are they the same, and do we expect that to be what it winds 770 01:08:08,110 --> 01:08:11,830 up being about five years from now, or will that likely go up due to inflation? 771 01:08:11,830 --> 01:08:18,450 So that's was in the budget currently as the part of the 2027 numbers. 772 01:08:19,650 --> 01:08:23,590 The total project costs in future years could increase. 773 01:08:23,730 --> 01:08:28,110 This is based on our kind of what we know at the moment and including prior year costs, 774 01:08:28,270 --> 01:08:31,830 the actuals included up to through 2025. 775 01:08:33,150 --> 01:08:37,070 So 198 is kind of our number best known number at the moment. 776 01:08:38,510 --> 01:08:44,990 In next year's budget, that could go up slightly based on updated pricing, but it's kind 777 01:08:44,990 --> 01:08:48,650 of the our our 2027 number. 778 01:08:49,570 --> 01:08:54,590 And is it fair to say based on this chart we're looking at, are we about half way done 779 01:08:54,590 --> 01:09:00,750 with the actual work, but we've only spent about 20% of the dollars is that, and both of 780 01:09:00,750 --> 01:09:01,350 those. 781 01:09:01,350 --> 01:09:05,470 because the work from what I understand with these projects, 782 01:09:06,010 --> 01:09:07,330 the costs are kind of delayed, 783 01:09:07,970 --> 01:09:11,910 invoicing comes later once the work is finally completed. 784 01:09:12,150 --> 01:09:13,430 So the work is halfway done. 785 01:09:13,550 --> 01:09:16,950 I think we're just waiting on final invoicing for some of these, 786 01:09:17,090 --> 01:09:20,030 and I'm sure Director Blanis could explain more. 787 01:09:22,600 --> 01:09:26,040 But yes, the project that I completed was a smaller project, 788 01:09:26,340 --> 01:09:29,740 the larger projects are underway now in next year 789 01:09:29,740 --> 01:09:32,180 with the south plant and northern plant expansions. 790 01:09:32,660 --> 01:09:37,300 So those are the real big ticket items, the ones that we've been done are the smaller ones. 791 01:09:38,900 --> 01:09:43,720 So the Southland Project is underway, and the monthly invoices that we process are large. 792 01:09:44,620 --> 01:09:50,140 So as we get both the Southland and the Northland underway, you'll see this bit budget go up much higher 793 01:09:50,140 --> 01:09:52,060 because they're just much larger projects. 794 01:09:52,940 --> 01:09:54,980 Maybe one quick follow-up for Director Blena. 795 01:09:55,080 --> 01:09:59,960 If you could just tell us from a substantive perspective are the projects going well, is it about how you... 796 01:10:00,000 --> 01:10:05,320 We thought and hoped the spring group projects would go and are you happy with where we're at right now? 797 01:10:05,840 --> 01:10:13,740 Yes. Our spring group projects are going to stream me well. We're very fortunate. We've had good contractors and the projects are going very smoothly. 798 01:10:14,880 --> 01:10:24,300 I think we've had very few change orders, which is a good sign as well. So yes, I think the only thing that I would make my make a comment on is on the North plant. 799 01:10:24,300 --> 01:10:28,720 We wanted to be a little bit further this year, but as we got into the South Plank 800 01:10:28,720 --> 01:10:32,860 construction and finished the final design for the North Plank, we realized it was 801 01:10:32,860 --> 01:10:37,480 probably better from a coordination standpoint to delay the North Plank a little bit because 802 01:10:37,480 --> 01:10:42,840 we knew more about the South Plank in the North Plank design because that those two projects had 803 01:10:42,840 --> 01:10:48,600 to be coordinated very tightly as we build one and take it offline for the other one. 804 01:10:48,860 --> 01:10:53,920 So it's really important that we understand sort of how that works and because of that and 805 01:10:53,920 --> 01:10:56,580 what we know now, who final design on the North plant, 806 01:10:56,800 --> 01:10:58,500 that got pushed out a little bit, 807 01:10:59,160 --> 01:11:01,140 and we just picked out the bed early next year. 808 01:11:01,780 --> 01:11:03,780 So that's like the only delay, but it was a plan delay. 809 01:11:04,760 --> 01:11:05,820 All right, thank you. 810 01:11:05,980 --> 01:11:06,600 I'll tell him Gibson. 811 01:11:07,140 --> 01:11:07,840 Thank you, Mayor. 812 01:11:08,760 --> 01:11:10,740 I'd like to start off by saying this slide 10 813 01:11:10,740 --> 01:11:13,360 is an awesome graphic, really helpful. 814 01:11:13,760 --> 01:11:15,460 I know I sent through a lot of questions, 815 01:11:16,180 --> 01:11:20,500 kind of an acuté format, and this sort of holistic view 816 01:11:20,500 --> 01:11:23,520 for projects, it's just really helpful 817 01:11:23,520 --> 01:11:25,820 going forward in great question by Councilman Kelly 818 01:11:26,460 --> 01:11:28,060 about projected change in the cost. 819 01:11:28,260 --> 01:11:30,620 I hadn't thought of that, just in general, 820 01:11:31,140 --> 01:11:33,000 I like the slide a lot. 821 01:11:34,220 --> 01:11:37,080 So what we could level set about water main replacements, 822 01:11:38,300 --> 01:11:41,360 if you could just remind me kind of standard 823 01:11:41,360 --> 01:11:44,980 is the goal of what, seven to 10 miles a year 824 01:11:44,980 --> 01:11:46,680 is what we've been hoping for. 825 01:11:48,900 --> 01:11:50,640 Yes, so with each rate study, 826 01:11:51,520 --> 01:11:54,060 we were trying to take a little bit more work in that regard. 827 01:11:54,060 --> 01:11:56,120 Our goal is to get to 10 miles. 828 01:11:56,920 --> 01:11:59,400 We did a condition assessment study several years ago. 829 01:12:00,100 --> 01:12:02,620 And we've fallen pretty far behind on the main replacement. 830 01:12:03,500 --> 01:12:06,900 And to get caught out, we need to get to 10 miles for a while. 831 01:12:07,580 --> 01:12:09,040 But we can't do all that at once. 832 01:12:09,600 --> 01:12:13,180 So we had to sort of gradually stairs to up that program up. 833 01:12:13,620 --> 01:12:18,800 And we took the opportunity with each rate study to sort of take 834 01:12:18,800 --> 01:12:20,140 out more work with each. 835 01:12:20,300 --> 01:12:23,220 So like hopefully the next rate study, we go from 7 to 10. 836 01:12:23,220 --> 01:12:27,920 or somewhere in that ballpark. So we went from like three miles to five miles to seven 837 01:12:27,920 --> 01:12:32,260 miles to two miles. So on the waterway side, we really have been sort of growing the program 838 01:12:32,260 --> 01:12:38,620 with each successive rate study. Okay, thank you, Director Blennis. What's like the lifespan of 839 01:12:38,620 --> 01:12:40,600 a standard 75 to 100? 840 01:12:42,740 --> 01:12:46,800 Correct. About 85 years to 100 years. Fortunately, some of the pipe that was 841 01:12:46,800 --> 01:12:50,800 put in the 60s, 70s and 80s is not lasting that long. 842 01:12:51,020 --> 01:12:52,580 It's lasting around 50 years. 843 01:12:54,040 --> 01:12:57,340 So, but Pipe put in today should last 85 to 100 years. 844 01:12:57,760 --> 01:13:00,580 Okay, thank you, because I do notice I don't know if we can go 845 01:13:00,580 --> 01:13:01,660 to slide 13, 846 01:13:04,080 --> 01:13:06,080 this looks like a lot of water main replacement 847 01:13:06,080 --> 01:13:10,320 and it absolutely is, but I also notice that it's not a whole map 848 01:13:10,320 --> 01:13:11,460 our city, 849 01:13:13,480 --> 01:13:21,320 lots of areas to the south, to the west, and this is covering six years of 850 01:13:21,320 --> 01:13:27,700 plans. So I just thrown it on our radar that there's a lot of the city that this is coming 851 01:13:27,700 --> 01:13:33,960 up when we're talking about maintenance and increasing. And then on the next slide, 852 01:13:36,640 --> 01:13:36,720 it's 853 01:13:36,720 --> 01:13:38,240 probably a very dumb question. 854 01:13:38,620 --> 01:13:41,020 Sour main is different than a water main, correct? 855 01:13:41,940 --> 01:13:51,960 So, this East Highlands Sour main, 1990s, that's about 35 years ago, why, what's life span of that? 856 01:13:52,200 --> 01:14:00,380 So, that pipe was rehabbed in the 1990s, so we put it in a liner to extend the life of the pipe, and that lining is starting to fail. 857 01:14:01,260 --> 01:14:05,160 You can't line a liner, so now that we have, we put the liner in the 90s and it's failing, 858 01:14:05,160 --> 01:14:10,480 or only hope is to replace the pipe, so that's why we're doing the rehab for East Highlands. 859 01:14:11,240 --> 01:14:16,220 So the line of put in the 90s gave us more time, but that line is starting to fail. 860 01:14:16,980 --> 01:14:27,840 Okay, so presumably the neighborhoods that have been built later in the 80s and 90s further to the south are better sewer materials and won't need to be replaced. 861 01:14:27,840 --> 01:14:33,780 We do inspections every year, and any of the rehabs that we've done in that area are 862 01:14:33,780 --> 01:14:39,880 cornering our inspections are holding, and we did inspections of this area that lining in 863 01:14:39,880 --> 01:14:43,280 these areas are failing as causing problems. 864 01:14:46,010 --> 01:14:46,430 All right, thanks. 865 01:14:46,430 --> 01:14:46,950 That's really helpful. 866 01:14:47,230 --> 01:14:52,210 Council, were you referring to neighborhoods in the Southern portion of the neighborhood like 867 01:14:52,210 --> 01:14:56,970 Maplebrook and some of those older neighborhoods when you said the south, they're really... 868 01:14:56,970 --> 01:14:58,810 Yeah, just in general looking. 869 01:14:58,810 --> 01:14:59,950 and if we're replacing... 870 01:15:00,690 --> 01:15:07,950 So, we're main replacements that have been fixed in 1990s at $4.3 million dollars. There's a lot of news source 871 01:15:07,950 --> 01:15:13,950 that we're put in around that time too, and I'm concerned that that means we're going to have to start replacing those soon as well. 872 01:15:14,670 --> 01:15:19,970 The supermaids are typically also have a useful life of more than 50 years. 873 01:15:20,750 --> 01:15:26,010 You put the line around, the line that can get you traditional 30 years potentially, if it all goes to plan. 874 01:15:26,010 --> 01:15:31,110 Unfortunately, the liner in these areas are failing and we need to be replaced. 875 01:15:31,650 --> 01:15:32,030 Okay. 876 01:15:32,710 --> 01:15:33,070 Thank you. 877 01:15:33,710 --> 01:15:34,270 Council Magine. 878 01:15:34,990 --> 01:15:35,790 Thank you, Mayor. 879 01:15:37,650 --> 01:15:42,390 Along the same line of questioning regarding the water distribution. 880 01:15:44,310 --> 01:15:51,450 Are there any like external factors that might interfere with our timeline that, you know, 881 01:15:51,450 --> 01:15:58,870 whether or, you know, material access that we should kind of be aware of. 882 01:15:59,290 --> 01:16:05,410 I think our biggest limitation is cash of, you know, availability, you know, in funds and also 883 01:16:05,410 --> 01:16:07,530 coordination with other departments. 884 01:16:08,850 --> 01:16:13,410 You know, we have to coordinate very closely with the road program and road resurfacing program. 885 01:16:14,170 --> 01:16:18,710 So we have to make sure that we coordinate closely, you know, with all the utilities that are 886 01:16:18,710 --> 01:16:26,230 ground. So that's also a limiting factor as well. So every year we have meetings, 887 01:16:26,410 --> 01:16:30,370 they'll be coordinated with Ted, electric, public works to make sure that we're not 888 01:16:30,370 --> 01:16:35,530 getting in each other's way. Or Ted will do a row resurfacing and they're not 889 01:16:35,530 --> 01:16:38,690 coming in the next year and tearing up with waterman replacement. So we want to 890 01:16:38,690 --> 01:16:42,350 ensure it's coordinated. So I think those are the biggest limitations to make sure 891 01:16:42,350 --> 01:16:44,090 we do this at a very coordinated fashion. 892 01:16:44,090 --> 01:16:52,790 Okay. Thank you. And a quick question. And I apologize. I'm going back to slide number five. 893 01:16:56,000 --> 01:17:04,840 Just if someone could explain the drop from 2028 to 2029 and our CIP budget of roughly 50 million. 894 01:17:05,240 --> 01:17:14,100 Like is that due to anticipated upgrades that we have in the coming years, but we don't necessarily anticipate that starting 2029. 895 01:17:15,720 --> 01:17:17,980 Just seems like a substantial drop. 896 01:17:19,680 --> 01:17:23,780 We have to maybe check a little further, but it could be due to the timing of the Spring 897 01:17:23,780 --> 01:17:24,880 Brook projects. 898 01:17:25,920 --> 01:17:30,780 Also sometimes what you see in a CIP just in general is the out-ears tend to be a little lighter 899 01:17:30,780 --> 01:17:36,200 in terms of projects, we tend to front-load them, even though we try our best to spread them 900 01:17:36,200 --> 01:17:41,420 out as you'll see in the presentation tonight, but it could be Spring Brook and North 901 01:17:41,420 --> 01:17:43,300 a road dropping off as well. 902 01:17:43,480 --> 01:17:44,760 Some of the larger ticket items. 903 01:17:45,140 --> 01:17:45,940 Yeah, that makes sense. 904 01:17:46,000 --> 01:17:48,740 I just wanted to make sure there was something we weren't. 905 01:17:48,860 --> 01:17:51,080 That I might be missing that might be coming up. 906 01:17:51,260 --> 01:17:53,300 So thank you for clarifying that. 907 01:17:54,680 --> 01:17:55,520 That's an oight. 908 01:17:57,360 --> 01:17:58,240 Thank you. 909 01:17:58,720 --> 01:18:03,000 A question on the slide number 10, if you can go back to that one. 910 01:18:03,560 --> 01:18:07,320 Now, is everything here based on the phosphorus, 911 01:18:07,860 --> 01:18:09,920 or is there other items on here that 912 01:18:09,920 --> 01:18:12,480 with other aspects of the revitalization? 913 01:18:14,140 --> 01:18:15,920 Fossures is a piece of this. 914 01:18:16,520 --> 01:18:19,840 So we are using the Fossures funds to offset or cost 915 01:18:19,840 --> 01:18:21,520 across all these projects. 916 01:18:22,980 --> 01:18:26,840 This includes the Fossures Removal, this includes 917 01:18:27,740 --> 01:18:31,200 making the plant larger capacity and also just replacing 918 01:18:31,680 --> 01:18:34,020 50-year-old concrete that's starting to fail. 919 01:18:34,560 --> 01:18:37,680 So basically, it's maintenance, it's upgrades, 920 01:18:37,680 --> 01:18:42,780 capacity improvements and also the phosphorus requirement. So it's all 921 01:18:42,780 --> 01:18:46,740 he about. And I asked a question because I mean when I was first 922 01:18:46,740 --> 01:18:52,680 on council I think my first budget was probably 2018's budget and I 923 01:18:53,280 --> 01:18:56,400 want to say the phosphorus plant was estimated to be 50 million 924 01:18:56,400 --> 01:19:00,320 dollars and we had to come up with about 25 and you're telling me we're 925 01:19:00,320 --> 01:19:02,300 to 100 million right now. 926 01:19:04,680 --> 01:19:10,820 The original estimates that is correct, phosphorus is a piece of this by the, and in phosphorus 927 01:19:10,820 --> 01:19:17,520 is mostly included within, I think that's what the clock needed disc filters. 928 01:19:17,680 --> 01:19:19,380 It would be a low-dream room room room unit. 929 01:19:19,380 --> 01:19:24,020 In the south plant, the North plant and the clock media disc filters are a phosphorus related, 930 01:19:24,340 --> 01:19:27,140 but they also include capacity expansions as well. 931 01:19:27,140 --> 01:19:35,760 So, I'd say the phosphorus improvements are probably total around half of the total cost. 932 01:19:36,380 --> 01:19:39,100 So it's, okay, that's kind of why I was wearing it. 933 01:19:39,300 --> 01:19:41,480 And the $15 million was in $2017. 934 01:19:42,360 --> 01:19:43,560 Yeah. So that's about 10 years old now. 935 01:19:43,600 --> 01:19:45,000 So it's essentially doubled. 936 01:19:46,080 --> 01:19:46,540 Yes. 937 01:19:46,580 --> 01:19:48,640 Compared to where, I don't know who was that. 938 01:19:48,760 --> 01:19:50,020 I think it may have been a meal. 939 01:19:50,320 --> 01:19:53,120 Mr. Malone was talking about how much things have increased. 940 01:19:53,140 --> 01:19:53,600 Correct. 941 01:19:53,880 --> 01:19:54,760 But the parking deck. 942 01:19:55,900 --> 01:19:59,680 And so in a longer way, more expensive it gets. 943 01:20:00,430 --> 01:20:03,590 It's a lie. Thank you. 944 01:20:06,680 --> 01:20:07,620 That's all for the questions. 945 01:20:12,350 --> 01:20:21,290 All right, that would bring things back to me. Let's see. For the electric utility, 2027 planned capital investments, total 946 01:20:21,290 --> 01:20:26,790 just under $30 million. Main focus is to continue with the Skate in Durham's implementation. 947 01:20:28,150 --> 01:20:33,410 As a reminder, this project is necessary to ensure the city can replace the current Skate Assistant 948 01:20:33,410 --> 01:20:36,530 prior to it becoming obsolete in 2028. 949 01:20:37,870 --> 01:20:43,230 Last year, the city was expecting a little over $700,000 in federal grants. 950 01:20:43,730 --> 01:20:45,390 They were going to help fund this project. 951 01:20:45,910 --> 01:20:50,050 However, due to federal policy change, grant funding was pulled. 952 01:20:50,950 --> 01:20:56,950 We appealed the decision, and while no grant money is expected in 2026 to fund the upgrade, 953 01:20:57,310 --> 01:21:02,130 we're very happy to report that about a million dollars in federal funding will likely 954 01:21:02,130 --> 01:21:06,810 be available, available to us next year. 955 01:21:08,630 --> 01:21:09,950 Now, this can still change. 956 01:21:10,510 --> 01:21:15,330 We're currently operating with the impression that the federal grant money will be secured 957 01:21:15,330 --> 01:21:19,790 in 2027, and that will be included as a funding component for the CIP. 958 01:21:21,470 --> 01:21:27,530 Other significant capital projects, $3.2 million for utility hardware and metering upgrades. 959 01:21:28,350 --> 01:21:32,390 This allows our electric utility to upgrade the hardware required to support 960 01:21:32,390 --> 01:21:33,770 metering and billiard operations. 961 01:21:34,990 --> 01:21:38,390 And then we also plan to continue investing heavily in cable replacement 962 01:21:38,390 --> 01:21:42,650 program with work scheduled to take place in the areas surrounding the river. 963 01:21:45,980 --> 01:21:48,920 Another major area, focus of the utility substations. 964 01:21:49,400 --> 01:21:52,720 The equipment plays a major role in reliably transmitting power 965 01:21:52,720 --> 01:21:54,660 through the city's electrical system. 966 01:21:55,320 --> 01:21:57,860 Whether a number of projects that maintain upgrade or replace 967 01:21:57,860 --> 01:22:03,060 sub-station components, this slide highlights a number of significant investments that are 968 01:22:03,060 --> 01:22:09,320 planned for the next year. Replacing various 34 and 138 KV relays at the ModF 969 01:22:09,320 --> 01:22:15,260 sub-station is expected to cost 1.3 million. Relay replacements enhance reliability 970 01:22:15,260 --> 01:22:21,280 across the system by protecting and isolating things like transmission lines and transformers. 971 01:22:21,820 --> 01:22:26,460 Utility will invest 1.3 million dollars to purchase sub-station and transformer replacements, 972 01:22:26,460 --> 01:22:32,760 which help ensure that assets meeting the end of their useful life are being replaced in a timely manner. 973 01:22:33,680 --> 01:22:37,440 Planion also calls for $2 million for cable replacements of various substations. 974 01:22:38,220 --> 01:22:43,220 And finally, we'll continue to see significant material deliveries for the toll waste substation. 975 01:22:44,200 --> 01:22:51,120 This substation is vital to the city's electrical system because it's responsible for power along the entire IIT corridor, 976 01:22:51,120 --> 01:23:01,080 as well as downtown Naperville, and question, spending to dates, we have spent $9.4 million 977 01:23:03,280 --> 01:23:08,300 in toll waste substation upgrades prior to this point. 978 01:23:09,480 --> 01:23:15,380 And then work, at least a toll waste substation, also includes construction of a new building, 979 01:23:15,380 --> 01:23:20,780 to House Equipment Indoor's, which we believe will significantly enhance our reliability. 980 01:23:23,890 --> 01:23:28,450 On to Undergrounding, during last year's budget process, Council engaged in a discussion 981 01:23:28,450 --> 01:23:31,370 around our plans for Undergrounding Overhead lines. 982 01:23:32,430 --> 01:23:36,990 At that time, Tier 1 option outlined on the table on the current slide was a directed 983 01:23:36,990 --> 01:23:37,850 path forward. 984 01:23:38,630 --> 01:23:45,730 As a reminder, this option is anticipated cost roughly $18 million by 2030, and focuses 985 01:23:45,730 --> 01:23:51,670 on under-grounding lines along major roadways and lines that feed major electrically equipment. 986 01:23:53,450 --> 01:23:58,370 The option allows you utility to reduce outages for more customers, while largely avoiding the 987 01:23:58,370 --> 01:24:05,210 need to work in residential neighborhoods. Proposed CIP includes $1.3 million for the continuation 988 01:24:05,210 --> 01:24:12,730 of the Tier 1 approach to under-grounding and work is going to focus on lines that feed major equipment items, 989 01:24:12,730 --> 01:24:17,290 including those that go in from the Aged and Substation to the Jefferson Substation. 990 01:24:18,030 --> 01:24:26,130 In the current year, we expect to spend $2.3 million this year. 991 01:24:26,610 --> 01:24:33,690 In Undergrounding, we previously, and what the 2.3 million 992 01:24:33,690 --> 01:24:35,510 and we're continuing to do it. 993 01:24:35,510 --> 01:24:40,050 Currently working on is Aged into Eagle Street Undergrounding. 994 01:24:40,050 --> 01:24:44,290 and we've actually already started the directional boring for that. 995 01:24:45,030 --> 01:24:49,910 For next year, the 1.3 is significantly less than our original plan. 996 01:24:50,310 --> 01:24:59,730 That was due to the fact that we anticipated getting some federal grant funding to assist us in this from resiliency standpoint. 997 01:25:00,000 --> 01:25:18,840 And that funding did not pan out. So our electric utility staff are currently reviewing the rest of the tier 1 to appropriately kind of sequence it because we're going to have to change its significantly since we'll be doing much less than we anticipated in 2027. 998 01:25:21,140 --> 01:25:24,260 Uh, let's see. 999 01:25:27,360 --> 01:25:28,000 Questions? 1000 01:25:29,160 --> 01:25:30,140 Are there any questions? 1001 01:25:30,440 --> 01:25:31,080 Councilman Gibson? 1002 01:25:33,300 --> 01:25:33,740 Yeah. 1003 01:25:34,100 --> 01:25:34,440 Thank you, Mayor. 1004 01:25:34,860 --> 01:25:36,700 I, the Toeway Substation upgrades. 1005 01:25:36,980 --> 01:25:39,680 How does the amount of work we've put into that substation 1006 01:25:39,680 --> 01:25:43,340 compared to the substation and other 15 or on the city? 1007 01:25:44,480 --> 01:25:48,080 You know, Mr. Man, you were probably best position for that. 1008 01:25:49,640 --> 01:25:54,620 Yes, we, it's been a long term strategic position to upgrade Toeway. 1009 01:25:54,620 --> 01:26:01,240 And we are spending more on that whole way because of the impact and proximity to I-88 1010 01:26:01,240 --> 01:26:02,900 and the impact from Salt Spray. 1011 01:26:03,400 --> 01:26:07,060 So when that happens, we've experienced a lot of customer outages, 1012 01:26:07,320 --> 01:26:12,940 so the thought is to bring that infrastructure inside for long-term reliability. 1013 01:26:16,250 --> 01:26:21,890 As a fellow, would you say most of that works to meet current need or expected increase need in the future? 1014 01:26:24,930 --> 01:26:28,790 When the building was designed, it was with both in mind. 1015 01:26:29,190 --> 01:26:33,710 It does need an immediate need, but it is planned for the future as well. 1016 01:26:41,060 --> 01:26:41,680 Councilor White? 1017 01:26:43,060 --> 01:26:43,420 Thank you. 1018 01:26:43,700 --> 01:26:48,700 And just one quick follow-up to that with what we're spending for the boring and 1019 01:26:48,700 --> 01:26:49,000 underground. 1020 01:26:50,260 --> 01:26:53,540 We were at 94% where how much culture does this get us to 100? 1021 01:26:57,980 --> 01:26:59,500 My answer would be a little bit. 1022 01:27:00,220 --> 01:27:03,240 But Mr. Mayan might be able to provide a little more detail on that. 1023 01:27:03,240 --> 01:27:09,380 I think with our current schedule, we were looking at what like half a percent per year or something. 1024 01:27:13,640 --> 01:27:22,080 That'd be fairly accurate, half percent per year, but right now where we're at is the toughest remaining to underground. 1025 01:27:23,060 --> 01:27:30,260 And what we haven't talked about is the rear lights where we would have to negotiate easements with each individual resident. 1026 01:27:30,700 --> 01:27:33,540 And that becomes a little more problematic and a little bit more expensive. 1027 01:27:34,600 --> 01:27:44,280 I mean, 94% is awesome, but I know with the recent storms we had and I want to say they hit 1028 01:27:44,280 --> 01:27:50,700 your neighborhood, your neighborhood, lots of electricity for some significant period of time, 1029 01:27:50,860 --> 01:27:55,380 I had some friends a little over there as well, and it does bring it to light that little extra 1030 01:27:55,380 --> 01:27:59,300 6% you know, let's see if we can take care of it. 1031 01:28:01,220 --> 01:28:07,580 Councilman Olzer. Thank you, Mayor. Another question for Director Man is a follow-up to 1032 01:28:07,580 --> 01:28:14,060 Councilman Gibson's question. I know that one of the developments that was contemplated last year 1033 01:28:14,560 --> 01:28:21,400 would have been a major power user right by IDA. So the Keras project has been enough not happening. 1034 01:28:22,820 --> 01:28:28,420 How had that gone through? How would that have impacted the IDA-8 substation and what changes, 1035 01:28:28,420 --> 01:28:33,020 You know, now that it's a residential neighborhood, there that's using a significantly different 1036 01:28:33,020 --> 01:28:38,500 amount of energy, we're talking about the data center, you correct, okay? 1037 01:28:39,900 --> 01:28:46,460 There could be a lengthy answer, I'll try to shorten it, the demand for their electricity, 1038 01:28:47,040 --> 01:28:50,480 we would have had to supply it from two different locations for redundancy. 1039 01:28:51,000 --> 01:28:56,540 So it would have been a very significant project to undertake, we believe we could have fed them 1040 01:28:56,540 --> 01:29:00,620 initially from a total waste substation. 1041 01:29:00,920 --> 01:29:03,920 However, the second feed would have had to come from another area. 1042 01:29:04,660 --> 01:29:09,300 And the good news is that cost would have been transferred to the cost-causer. 1043 01:29:10,220 --> 01:29:15,580 So it would have helped with reliability for that location, but on the negative side too 1044 01:29:15,580 --> 01:29:20,620 that, then, once that infrastructure is installed, then we have to own and maintain it. 1045 01:29:21,080 --> 01:29:21,240 Okay. 1046 01:29:21,460 --> 01:29:21,840 Thank you, Mayor. 1047 01:29:22,960 --> 01:29:23,780 Councilman Kelly. 1048 01:29:24,460 --> 01:29:24,760 Thank you, Mayor. 1049 01:29:24,940 --> 01:29:27,020 Just want to follow up with Councilman White's point about the 1050 01:29:27,020 --> 01:29:29,540 Undergrounding, which I think he's right on the money on that. 1051 01:29:30,040 --> 01:29:31,480 We saw this past summer. 1052 01:29:31,700 --> 01:29:32,820 How important it is. 1053 01:29:33,260 --> 01:29:36,060 Two things I just want to follow up on that I heard from staff. 1054 01:29:37,100 --> 01:29:39,580 One from Mr. Krieger I heard we're doing a lot less in 1055 01:29:39,580 --> 01:29:42,740 27 because of the lack of the federal grant. 1056 01:29:43,300 --> 01:29:48,020 Will we so first question is will we still plan to do the same amount of work 1057 01:29:48,020 --> 01:29:50,560 just over extended period of time, 1058 01:29:50,740 --> 01:29:53,300 or is that going to impact the long-term scope 1059 01:29:53,300 --> 01:29:54,200 of what you plan to do? 1060 01:29:54,640 --> 01:29:58,360 You know, two things, the overall scope is not changed. 1061 01:29:59,260 --> 01:29:59,640 Obviously. 1062 01:30:00,700 --> 01:30:07,360 We are going to have to reprogram a lot of that 2027 work into the final three years, but we still need 1063 01:30:07,360 --> 01:30:12,600 to get it done. And then second, related, even though it wasn't a question, we are going to continue 1064 01:30:12,600 --> 01:30:18,660 to seek federal funding for assistance without further further undergrounding. And then the second question 1065 01:30:18,660 --> 01:30:25,060 for either Mr. Krieger or Mr. Mann, I think I heard you say that right now, we're in the hardest part of it, 1066 01:30:26,000 --> 01:30:29,980 and I always thought the hardest part was going to be if and when we got to the backyards that you mentioned, 1067 01:30:29,980 --> 01:30:36,040 which I might or settings were not there right now, and that would be a decision for future 1068 01:30:36,040 --> 01:30:40,480 council order to proceed with that phase, which would be a separate phase and this phase 1069 01:30:40,480 --> 01:30:42,400 one. Do I have that right? 1070 01:30:43,500 --> 01:30:48,840 Yes, that is correct. I may have missedpoke. The hardest part is going into the rear 1071 01:30:48,840 --> 01:30:58,940 lots and negotiating for easements with each individual customer and identifying that that 1072 01:30:58,940 --> 01:31:04,040 anything three phase along existing roadways because we already have rates to be there. 1073 01:31:04,040 --> 01:31:06,220 And that's what we're doing right now. 1074 01:31:06,480 --> 01:31:06,660 Yes, sir. 1075 01:31:06,800 --> 01:31:07,100 That's correct. 1076 01:31:08,140 --> 01:31:15,440 When would we reach a decision point for the city council to decide whether or not to proceed with, 1077 01:31:15,440 --> 01:31:22,360 I don't know if it's phase two or phase three or some other phase number, but essentially the potential backyard situation? 1078 01:31:22,360 --> 01:31:32,400 You know, they would probably be in 28 or 29 time frame, which would allow us time to take care of the design aspects ahead of the, you know, the end of 2030. 1079 01:31:33,180 --> 01:31:40,740 And what we're doing tier one right now, we'll do that regardless of what a future council decides whether they decide to do that additional work or not. 1080 01:31:41,400 --> 01:31:48,840 Our plan right now is to, you know, complete tier one, any council, any year could, you know, 1081 01:31:48,920 --> 01:31:54,220 they could pull the plug on something, but that is, that's currently our plan is to complete 1082 01:31:54,220 --> 01:31:55,360 all of the tier one. 1083 01:31:55,600 --> 01:31:56,080 All right, very good. 1084 01:31:56,100 --> 01:31:57,500 Thank you. 1085 01:31:57,980 --> 01:32:02,180 Now we're going to take a six minute break, we'll be back at 737. 1086 01:32:46,020 --> 01:32:50,540 Okay, it's 737 and we're going to go ahead and reconvene here. 1087 01:32:50,820 --> 01:32:53,560 Can we confirm that Councilman Sayed is still with us on the phone? 1088 01:32:58,200 --> 01:33:00,000 Councilman Sayed, can you hear us? 1089 01:33:04,740 --> 01:33:05,500 Councilman Sayed? 1090 01:33:09,830 --> 01:33:11,970 We're just good for him at the line still up in here. 1091 01:33:35,510 --> 01:33:36,030 Good enough. 1092 01:33:36,950 --> 01:33:39,490 High Councilman Sayed and your back live in chambers. 1093 01:33:39,670 --> 01:33:40,030 Thank you. 1094 01:33:40,370 --> 01:33:40,770 Thank you. 1095 01:33:42,650 --> 01:33:47,110 All right, Mr. Krieger, you want to go ahead and proceed with the Facilities Transportation 1096 01:33:47,110 --> 01:33:49,070 Technology Vehicles Network Project. 1097 01:33:50,070 --> 01:33:51,890 Ms. Galley, you will be handling that. 1098 01:33:52,170 --> 01:33:57,370 Thanks Doug. In this section, we will highlight the CIP for facilities, transportation, 1099 01:33:58,350 --> 01:34:00,770 technology vehicles, and downtown projects. 1100 01:34:03,150 --> 01:34:08,690 Plant capital investment in city facilities totals almost $14 million in 2027. 1101 01:34:08,690 --> 01:34:14,750 Most projects in this category are multi-year programs included in several budget cycles. 1102 01:34:16,390 --> 01:34:22,630 2027 is year 5 of a 10-year renovation plan for the almost 40-year-old police department. 1103 01:34:23,410 --> 01:34:29,550 Since 2022, the locker rooms, patrol sergeant area and evidence area have all been renovated. 1104 01:34:30,930 --> 01:34:35,890 At a cost of just over a million dollars, the focus for the next year will be on rehabilitating 1105 01:34:35,890 --> 01:34:40,030 offices in the Investigation Division and Bathrooms throughout the building. 1106 01:34:41,450 --> 01:34:45,770 The continuation of living quarter renovations at the various fire stations is returning 1107 01:34:45,770 --> 01:34:47,290 to the CIP next year. 1108 01:34:48,090 --> 01:34:54,130 This project was included in several previous capital budgets, however, staff prioritized improvements 1109 01:34:54,130 --> 01:34:57,590 at fire station for training facility in 2026. 1110 01:34:58,930 --> 01:35:00,950 with the majority of those improvements come. 1111 01:35:00,000 --> 01:35:07,700 Complete, staff is reprogramming $700,000 for living-quarter renovations at fire stations five and six. 1112 01:35:09,060 --> 01:35:18,020 In terms of new initiatives, public works is including $300,000 for a comprehensive evaluation of city building assets and major systems. 1113 01:35:19,080 --> 01:35:28,280 This project will allow staff to better understand the overall condition of city buildings, which will help prioritize maintenance and replacement needs in the coming years. 1114 01:35:30,000 --> 01:35:35,900 The second new project is a feasibility study for long-range site plans that is being led by the neighbor settlement. 1115 01:35:37,320 --> 01:35:44,100 The overall goal for this project is to evaluate moving four historical structures, the blacksmith shop, 1116 01:35:44,460 --> 01:35:49,740 firehouse, stone carber, and print shop to new locations on the settlement property. 1117 01:35:49,740 --> 01:36:00,080 Faces 1 and 2 are planned for 2027 and include a focused side assessment and the development of studies to evaluate the relocation of these buildings. 1118 01:36:03,520 --> 01:36:09,380 As previously mentioned, the highest level of focus outside the utilities is on investments in transportation. 1119 01:36:10,660 --> 01:36:16,820 In 2027, transportation focused projects are anticipated to cost roughly $41 million. 1120 01:36:17,960 --> 01:36:24,080 Similar to facilities, many of these projects have been a work in progress over the last several years. 1121 01:36:24,880 --> 01:36:27,220 However, there are two new projects to cover. 1122 01:36:28,160 --> 01:36:35,480 The first is the signal installation at Jefferson and Westridge Court, or what is commonly referred to as the target light. 1123 01:36:36,560 --> 01:36:45,120 The CIP includes $75,000 for design work in 2027 with installations set to take place in 2028. 1124 01:36:46,380 --> 01:36:55,420 Although details are not final, staff will propose creating a special service area that both the developer and target will contribute to. 1125 01:36:56,200 --> 01:36:59,940 The next new project is the traffic signal communications upgrade. 1126 01:37:01,060 --> 01:37:07,620 Since the use of analog lines is being phased out, a number of traffic signal communication systems need to be upgraded. 1127 01:37:07,620 --> 01:37:12,280 $300,000 is included in the CIP for these upgrades. 1128 01:37:13,560 --> 01:37:20,360 The CIP also includes $575,000 for continuing initiatives like site and traffic development 1129 01:37:20,360 --> 01:37:26,680 in the Naperville South 40 located near Route 59 and 103rd. 1130 01:37:26,860 --> 01:37:33,860 Additionally, $1.2 million is budgeted for phase two of the centralized traffic signal management system, 1131 01:37:33,860 --> 01:37:38,040 which includes adding 25 existing signals to the system. 1132 01:37:39,560 --> 01:37:44,000 Construction costs for this project are estimated to be roughly two and a half million dollars. 1133 01:37:44,340 --> 01:37:48,840 However, the city will only be responsible for 20% of these costs, 1134 01:37:49,100 --> 01:37:52,020 with the other 80% being covered by federal funds. 1135 01:37:56,010 --> 01:37:59,650 On this slide, we outline other major transportation projects that are planned. 1136 01:38:00,530 --> 01:38:04,670 A little over a million dollars is included for the 248th Avenue upgrades. 1137 01:38:04,670 --> 01:38:12,590 Design work in land acquisition are planned to continue into 2027 and construction starting in 2028. 1138 01:38:14,010 --> 01:38:21,010 Upgrades include construction of new pavement, curb, gutters, streetlights, sidewalks, and storm sewers. 1139 01:38:22,110 --> 01:38:27,810 Almost $2 million is included for the removal and replacement of the Fox River Commons retaining wall, 1140 01:38:28,390 --> 01:38:33,230 and a little over $2 million is budgeted for white oak roadway improvements. 1141 01:38:33,230 --> 01:38:40,010 This work includes bringing white oak up to city standards by upgrading curves, gutters, 1142 01:38:40,210 --> 01:38:42,890 utilities, streetlights, and other amenities. 1143 01:38:44,750 --> 01:38:50,130 Almost $3.5 million is planned to replace the 87th street bridge over Springbroke Creek. 1144 01:38:51,030 --> 01:38:57,710 Total construction costs are estimated to be $5.7 million, but the city has secured $3 million 1145 01:38:57,710 --> 01:39:03,230 in federal funding through the local bridge formula program to help cover the costs of this project. 1146 01:39:04,550 --> 01:39:09,850 And finally, construction on the North Aurora road underpass will continue into 2028. 1147 01:39:12,140 --> 01:39:16,500 Now I'll turn the presentation back over to Tracy to talk about technology. 1148 01:39:19,380 --> 01:39:19,780 Thanks, Pam. 1149 01:39:19,980 --> 01:39:24,340 Turning to technology, capital investments in this area total $8.1 million. 1150 01:39:24,340 --> 01:39:30,560 Of that amount, 5.1 million is budgeted for the building security and access upgrades project. 1151 01:39:31,460 --> 01:39:37,540 As previously presented, this project would provide an updated solution for managing secure access to various city buildings. 1152 01:39:38,420 --> 01:39:42,260 The scope also includes funding to replace camera software and fiber connectivity. 1153 01:39:43,260 --> 01:39:48,440 The 5.1 million dollars currently reflects the project cost anticipated for 2027. 1154 01:39:48,440 --> 01:39:54,860 The total project cost for 2026, 2027, and future years is closer to $8.3 million. 1155 01:39:56,840 --> 01:39:59,960 However, given the ongoing discussion surrounding the project, the budget... 1156 01:40:00,000 --> 01:40:12,480 Budget remains subject to change. And staff will continue to keep council informed and provide updates on the project scope and budget during upcoming workshops. Other major items include IT's capital replacement programs. 1157 01:40:13,440 --> 01:40:29,980 These are periodic replacement cycles to refresh various IT assets ranging from PCs and PC accessories to computing data storage and networking. The PC replacement program has a budget of 1.4 million while the strategic capital replacement program has a budget of 7 million. 1158 01:40:29,980 --> 01:40:37,240 in 130,000. Finally, we have the replacement of our utility billing software, budgeted at 660,000. 1159 01:40:38,020 --> 01:40:43,160 Our current utility billing software has been in use for more than 30 years. The updated software 1160 01:40:43,880 --> 01:40:50,060 will better meet our customer's needs and reflect ongoing technology changes over that same time frame. 1161 01:40:53,010 --> 01:40:57,390 Next is the proposed 2027 renewal of the Police Department's axon contract. 1162 01:40:57,390 --> 01:41:04,690 The current contract expires this year and the proposed renewal totals approximately $1.5 million in its first year. 1163 01:41:05,630 --> 01:41:12,450 The proposal consolidated several existing and previously approved axon programs and resources into a single contract, 1164 01:41:12,830 --> 01:41:18,250 saving an estimated $1.4 million annually, compared to maintaining the program separately. 1165 01:41:19,250 --> 01:41:25,870 The programs now covered by the consolidated contract include digital evidence management software and interview room technology, 1166 01:41:26,570 --> 01:41:32,850 Automated police reporting functionality, virtual reality training, and emergency communications software, 1167 01:41:33,710 --> 01:41:39,150 as well as body mourn cameras, which are legally mandated under the Safety Act and Squad Car cameras. 1168 01:41:40,290 --> 01:41:43,970 The consolidated contract also includes drones as first responder technology, 1169 01:41:44,630 --> 01:41:48,970 which was approved as part of the 2026 budget and discussed in last year's workshops. 1170 01:41:49,930 --> 01:41:56,970 The proposed tenure agreement would provide locked in pricing for each year of the contract with annual increases structured at 3%. 1171 01:41:57,850 --> 01:42:05,330 No, an annual increases provide greater predictability for future budget planning, which reduces uncertainty around future contract costs. 1172 01:42:06,230 --> 01:42:15,530 While the agreement is structured as a tenure contract, it also provides a city with an opportunity to reassess the technology, services costs, and future needs at the five year mark. 1173 01:42:15,530 --> 01:42:28,450 This provides a point for the city to evaluate whether the technology services, whether the technology and the services continue to align with operational needs and council priorities before proceeding with the remainder of the term. 1174 01:42:29,650 --> 01:42:38,390 Overall, the proposal balances long term price certainty and estimated cost savings with the flexibility and opportunity to reassess the city's needs at the five-year point. 1175 01:42:40,920 --> 01:42:51,880 Next, we'll discuss our vehicle replacement program, the total cost of vehicle replacements for the next year is $11 million, which is about $3 million more than last year. 1176 01:42:52,260 --> 01:42:57,380 Ideally, replacement schedules are used to keep the budget flat and avoid major spikes from year to year. 1177 01:42:58,280 --> 01:43:06,280 However, a number of public works vehicles were reprogrammed into 2027 and delivery of a fire engine was delayed leading to this year's variance. 1178 01:43:06,980 --> 01:43:13,080 It's important to note that certain vehicles have years of lead time in order to secure delivery for a particular year. 1179 01:43:13,460 --> 01:43:18,940 For example, the aforementioned fire engine was ordered in 2024, totaling $1.1 million. 1180 01:43:19,840 --> 01:43:25,460 This equates a one-third of the $3 million variance in replacement vehicle replacements for next year. 1181 01:43:26,580 --> 01:43:29,100 Display does a breakdown of vehicle replacements by department. 1182 01:43:29,900 --> 01:43:33,740 Across all city departments, 46 vehicles are planned for replacement next year. 1183 01:43:33,740 --> 01:43:37,920 three new vehicles are included in the budget pending FTE approval. 1184 01:43:41,300 --> 01:43:43,600 With that, we can answer questions from this section. 1185 01:43:43,940 --> 01:43:44,480 Tom and Jane? 1186 01:43:45,080 --> 01:43:45,720 Yes, thank you, Mayor. 1187 01:43:48,100 --> 01:43:54,340 Just a question regarding, well, I'm looking at the sign number 21 at the top. 1188 01:43:54,600 --> 01:43:58,540 It says capital investments total 13.6. 1189 01:44:00,100 --> 01:44:04,220 But the amounts listed on the slide don't add up to that. 1190 01:44:04,220 --> 01:44:06,900 So what am I, what am I missing? 1191 01:44:10,290 --> 01:44:13,810 So there's other projects that aren't included on this slide. 1192 01:44:13,950 --> 01:44:15,450 Let me see if there's an additional slide. 1193 01:44:16,430 --> 01:44:20,230 We could provide the full list of facility improvements, 1194 01:44:20,330 --> 01:44:21,190 these are the highlights. 1195 01:44:21,610 --> 01:44:24,830 We tend to also have, and we can pull the number, 1196 01:44:26,390 --> 01:44:29,850 general facility improvements across all city buildings. 1197 01:44:31,090 --> 01:44:32,850 That's not reflected on this slide. 1198 01:44:32,930 --> 01:44:34,790 We just kind of pull out some of the major highlights, 1199 01:44:34,790 --> 01:44:41,790 the major expenses, but we could provide a full list of what makes up that 13.6 million 1200 01:44:41,790 --> 01:44:42,390 if you'd like. 1201 01:44:42,810 --> 01:44:43,090 That's fine. 1202 01:44:43,210 --> 01:44:47,130 No, I just needed to make sure my math skills first. 1203 01:44:47,810 --> 01:44:49,310 It definitely does not end up yet. 1204 01:44:49,890 --> 01:44:50,590 Thanks, Dad. 1205 01:44:50,950 --> 01:44:52,210 Dad helped me with my math skills. 1206 01:44:52,330 --> 01:44:54,090 So I just want to make sure about that. 1207 01:44:54,510 --> 01:44:58,070 The second question I had is still on slide 21. 1208 01:44:58,990 --> 01:44:59,950 just if you could get 1209 01:45:00,000 --> 01:45:07,040 I have a little bit more of a background to the NAPERS settlement feasibility study. The need for 1210 01:45:07,040 --> 01:45:12,760 the study and what we hope the study will inform us about. 1211 01:45:13,180 --> 01:45:14,540 I think NAPERS settlement is here? 1212 01:45:14,960 --> 01:45:15,860 Yeah, thank you. 1213 01:45:23,640 --> 01:45:24,000 Ms. Calibrate. 1214 01:45:24,240 --> 01:45:27,420 Did you state your name and position for the record, please? 1215 01:45:27,780 --> 01:45:32,100 Absolutely. Rainer to my own calories. President and CEO of NAPERS settlement. Good afternoon. 1216 01:45:32,500 --> 01:45:34,660 And as always, it's always a pleasure to be with you. 1217 01:45:34,860 --> 01:45:35,660 Thank you. 1218 01:45:35,660 --> 01:45:40,360 The feasibility study is necessary for a few reasons. 1219 01:45:41,260 --> 01:45:44,680 There has been no long-range site plan for 1220 01:45:44,680 --> 01:45:48,720 neighbor settlement for over 20 some years. 1221 01:45:49,500 --> 01:45:51,420 And as you might imagine, 20 some years. 1222 01:45:51,620 --> 01:45:54,900 It was set up mostly as a settlement village that was 1223 01:45:54,900 --> 01:45:58,040 telling the story of the 1800s. 1224 01:45:58,180 --> 01:46:00,140 And today it's neighborville. 1225 01:46:00,820 --> 01:46:04,680 And in addition to the changes that have happened over the course of the last 10 years, 1226 01:46:04,680 --> 01:46:24,700 All of those buildings which are part of the legacy that we have and are very important to who we are and what we have on site are being evaluated because we are looking to align ourselves with how we tell the full story of Naperville and the populations and the people that have lived here for almost 200 years. 1227 01:46:26,590 --> 01:46:38,850 And the 145,000 for the feasibility city like can you can you just elaborate on what you think that study will show or 1228 01:46:39,530 --> 01:46:42,850 Sure, what will be done for 145,000? 1229 01:46:43,270 --> 01:46:43,530 Sure. 1230 01:46:45,130 --> 01:46:51,370 That this feasibility study is based upon on already plan that has been put forth by the 1231 01:46:51,370 --> 01:46:59,510 a heritage society and that plan was value will actually higher than 150,000 and so based 1232 01:46:59,510 --> 01:47:06,610 on what was paid from the Naperville Heritage Society from the private side of this public 1233 01:47:06,610 --> 01:47:10,950 private partnership, one of the important things is really to look at the interpretive 1234 01:47:10,950 --> 01:47:17,430 plan and how do we tell the interpretive story, how do we interpret the story of the entirety 1235 01:47:17,430 --> 01:47:23,590 of the city and the rest of all of those 40 miles that make up the city. 1236 01:47:24,190 --> 01:47:30,470 So based on some of the results from that, what we are looking to do is really to tell 1237 01:47:30,470 --> 01:47:34,530 a much more full town and country story. 1238 01:47:35,350 --> 01:47:40,730 And in order to do that, there is, and it doesn't really necessarily mean that we will 1239 01:47:40,730 --> 01:47:45,550 fully move the buildings and it may not even be feasible to move the buildings. 1240 01:47:45,550 --> 01:47:52,270 but before we move forward, we need to know what we have underneath, what we have in terms of 1241 01:47:52,270 --> 01:47:57,510 the buildings structurally to see whether or not they can withstand a move, for example, 1242 01:47:58,090 --> 01:48:02,930 and then based on that, we can develop the interpretive plan that would go along with the rest of 1243 01:48:02,930 --> 01:48:12,530 the long-site plan. Oh, yeah, thank you. And I have one more question. That's regarding the cameras 1244 01:48:12,530 --> 01:48:15,970 that we hope to discuss more in detail in November. 1245 01:48:17,010 --> 01:48:25,660 I just wanted to clarify by approving the 5.1 million, 1246 01:48:28,460 --> 01:48:33,440 are we, are we, do we have room to make 1247 01:48:33,440 --> 01:48:36,580 different decisions after afterwards? 1248 01:48:36,680 --> 01:48:40,300 I mean, like, does this, does this lock us in? 1249 01:48:40,300 --> 01:48:49,620 It absolutely does not. We plan on teaching that back up on November and, you know, we will do 1250 01:48:50,340 --> 01:48:53,420 Bacy is council director's. But no obligation. 1251 01:48:53,960 --> 01:48:56,040 Okay, thank you. 1252 01:48:56,200 --> 01:48:56,800 I'll spend Wilson. 1253 01:48:59,780 --> 01:49:07,420 Thank you. As far as the transportation goes, is there any way we'd be able to, I just just from 1254 01:49:07,420 --> 01:49:16,320 feedback from the community and just sort of with projects all over the city this year as far 1255 01:49:16,320 --> 01:49:25,080 as a book wrote and I mean a lot of this is out of our control here you know 59 for various things 1256 01:49:25,080 --> 01:49:31,390 have happened Washington and I've done there's there any way to delay or push back some of these 1257 01:49:32,670 --> 01:49:42,030 projects here, you know, I don't know, the site, south, south, 40 site development at 130, 1258 01:49:43,570 --> 01:49:51,190 159, I can see that being just a sort of a major inconvenience for people, the almost 1259 01:49:51,190 --> 01:49:58,650 construction at 59 or, I mean, I don't know, the white oak roadway improvement wall, not 1260 01:49:58,650 --> 01:49:59,750 and a major... 1261 01:50:00,000 --> 01:50:04,940 3, it's certainly a non-trivial amount of money. 1262 01:50:08,540 --> 01:50:15,520 We certainly do take into consideration the impacts over all across the city as we're planning out 1263 01:50:15,520 --> 01:50:16,260 these projects. 1264 01:50:16,620 --> 01:50:21,360 And I know as Dr. Blundis mentioned, we have a coordination meeting with all of the 1265 01:50:21,360 --> 01:50:23,260 electric water, public works. 1266 01:50:23,400 --> 01:50:26,780 We try to make sure that we're closely coordinating all of our projects. 1267 01:50:26,980 --> 01:50:31,640 This year, I agree has not been a good look between the waterlink project as well as 1268 01:50:31,640 --> 01:50:34,460 out 59 being under major construction by IDOT. 1269 01:50:35,460 --> 01:50:37,000 And then some of the other work going on. 1270 01:50:37,000 --> 01:50:40,800 So I do understand that there's been a lot of impact, particularly south of 70th Street, 1271 01:50:41,680 --> 01:50:42,960 for a lot of our motoring public. 1272 01:50:43,580 --> 01:50:45,760 In regards to some of these projects that you mentioned, 1273 01:50:46,360 --> 01:50:48,900 so we are actually already about to start. 1274 01:50:49,720 --> 01:50:52,260 Those improvements for the South 40 sites of Altman. 1275 01:50:52,400 --> 01:50:55,820 So we've been in award those, awarded that project already. 1276 01:50:56,440 --> 01:51:00,720 That is adding some turn lanes into the lifetime. 1277 01:51:00,720 --> 01:51:05,680 and the government development. So I'd like to see that continue on. I think that's going to be 1278 01:51:05,680 --> 01:51:11,380 important for that project. 87th street bridge. I know a question came up about that recently. 1279 01:51:12,180 --> 01:51:16,460 You know, that is a critical bridge improvement, understanding the location of that is a little 1280 01:51:16,460 --> 01:51:21,100 concerning given the continuing work on the water link. But we do think that when we start that 1281 01:51:21,100 --> 01:51:25,920 project next year, once it goes to bed, I think we're assuming around January, with work starting 1282 01:51:25,920 --> 01:51:30,720 next spring, that a lot of the current impacts being felt by the water link project will have 1283 01:51:30,720 --> 01:51:40,060 moved out of the area so we're less concerned. With that one, I agree White Oak is a short 1284 01:51:40,060 --> 01:51:45,220 stretch that will be mostly impactful to those residents there. We've had a lot of engagement with 1285 01:51:45,220 --> 01:51:51,380 those residents already and they're pretty excited about that. Project and seeing that upgrade. So 1286 01:51:51,380 --> 01:51:55,620 definitely understand and I think as we continue to plan out our projects and look at our broader 1287 01:51:55,620 --> 01:51:59,820 range, we'll definitely keep that in mind, but I think from a staff perspective, while we 1288 01:51:59,820 --> 01:52:03,820 may feel some feedback and some bumps with these things, we're fairly comfortable with 1289 01:52:03,820 --> 01:52:06,500 where we have most of these projects positioned right now. 1290 01:52:08,920 --> 01:52:09,600 That's been white. 1291 01:52:10,720 --> 01:52:11,200 Thank you. 1292 01:52:11,440 --> 01:52:14,320 Similar question to Councilwoman Jane. 1293 01:52:15,560 --> 01:52:19,660 I know you're only hitting the major projects up here, but I'm looking at the transportation 1294 01:52:19,660 --> 01:52:29,140 and 41 million, and what I'm seeing 75,000, okay, it's not 75,000, a lot of money, but 1295 01:52:29,140 --> 01:52:32,720 it doesn't seem to compute for 41 million. 1296 01:52:32,860 --> 01:52:38,420 In fact, it's like, what you're showing is less than half of what you're asking for. 1297 01:52:39,120 --> 01:52:43,680 Anything else you would want to mention that we would, we should know? 1298 01:52:44,960 --> 01:52:49,920 You know, Tracy just flipped over to kind of like the other major projects. 1299 01:52:51,160 --> 01:52:54,520 We, and kind of much, I guess we have a couple of things here. 1300 01:52:55,160 --> 01:53:00,440 We try to highlight a project that is of importance to the community, obviously they're 1301 01:53:00,440 --> 01:53:00,940 all important. 1302 01:53:01,680 --> 01:53:07,240 Typically, those are the highest dollar projects, or, you know, in the case of, you know, 1303 01:53:07,380 --> 01:53:12,200 the target stop light, it's not a lot of money, but it's important to a lot of people 1304 01:53:12,200 --> 01:53:13,820 and has been topical. 1305 01:53:14,600 --> 01:53:16,360 So we try to kind of pick and choose 1306 01:53:16,360 --> 01:53:19,720 what we think people want to talk about. 1307 01:53:19,800 --> 01:53:21,580 We're certainly not trying to hide anything. 1308 01:53:21,820 --> 01:53:24,460 But we can give you the full entire listing 1309 01:53:24,880 --> 01:53:26,060 before the next word job. 1310 01:53:26,540 --> 01:53:27,140 OK, thanks. 1311 01:53:27,460 --> 01:53:30,740 What's also not included here is the annual street maintenance, 1312 01:53:31,020 --> 01:53:34,140 which is $12 million, and that's just so routine. 1313 01:53:35,220 --> 01:53:36,440 But that would have come for a good chunk 1314 01:53:36,440 --> 01:53:37,560 of that that's not on the slides. 1315 01:53:37,760 --> 01:53:39,560 OK, and that's what I'm, yeah, that would be. 1316 01:53:39,560 --> 01:53:43,180 The MFT projects, that's probably not. 1317 01:53:43,360 --> 01:53:44,660 We might have specific projects, 1318 01:53:44,860 --> 01:53:45,980 but still we're not the full plan. 1319 01:53:47,440 --> 01:53:48,680 Now, that answers my question. 1320 01:53:48,960 --> 01:53:49,300 Thank you. 1321 01:53:49,540 --> 01:53:50,100 Councilwoman Gibson. 1322 01:53:51,300 --> 01:53:51,720 Thank you, Mayor. 1323 01:53:52,120 --> 01:53:55,900 I wanted to go back to the NAPER settlement feasibility study. 1324 01:53:56,700 --> 01:53:59,600 The 145K for this year, 1325 01:53:59,900 --> 01:54:04,560 and the NAPER settlement CIP, which is in the agenda for next week's 1326 01:54:05,520 --> 01:54:06,200 settlement meeting. 1327 01:54:06,200 --> 01:54:10,700 There's an additional 223,000 for a feasibility study. 1328 01:54:11,180 --> 01:54:18,860 So we just speak, is that next year's expense necessary to make this year's expense useful? 1329 01:54:23,690 --> 01:54:25,770 I was in Calabre, so you want to come back? 1330 01:54:38,440 --> 01:54:44,080 The short answer, and if I need to introduce myself right now to my Calabre's for anaper settlement, 1331 01:54:44,940 --> 01:54:49,980 the short answer is we're not entirely sure what will be necessary in 2028. 1332 01:54:50,900 --> 01:54:58,720 And, of course, we will be back here to gain that approval and to have certain more certain numbers at the time. 1333 01:54:58,960 --> 01:54:59,960 And then, at that point, we... 1334 01:55:00,000 --> 01:55:05,460 We can also make the calculations. You know, one of the things that the public private partnership 1335 01:55:06,460 --> 01:55:13,560 does very successfully is that it comes together and actually joins in the cost. And so, at 1336 01:55:13,560 --> 01:55:18,240 this point, we're not certain what that cost will be. We know that a feasibility would study 1337 01:55:18,240 --> 01:55:23,600 will be two other things. And then, with that, the Heritage Society will come forward in terms 1338 01:55:24,540 --> 01:55:29,160 of what part it will contribute. And as I said previously, in the same way that it has 1339 01:55:29,160 --> 01:55:40,580 here. The big lift for this in order for us to be able to know what we want to study was done with the funding from the 1340 01:55:40,580 --> 01:55:41,880 April Heritage Society. 1341 01:55:46,640 --> 01:55:53,200 Okay, so the feasibility study is two separate studies, one for 145,000, and then in 28, 1342 01:55:53,600 --> 01:56:00,580 a second part of the feasibility study for 223,000, or it's a larger feasibility study for 372,000. 1343 01:56:00,580 --> 01:56:07,980 The feasibility study at this point doesn't include the entire 13 acres, and it doesn't include 1344 01:56:07,980 --> 01:56:13,480 the entirety of the long-range plan, part of what we're looking to do right now is to look 1345 01:56:13,480 --> 01:56:18,560 to see whether or not the pieces that we want to do that would be necessary in the beginning, 1346 01:56:18,740 --> 01:56:26,640 which is in the interpretive plan, are even feasible. So if we spent 145,000 this year, 1347 01:56:26,640 --> 01:56:29,860 And next year, we decided not to spend the additional 227. 1348 01:56:30,460 --> 01:56:32,960 Does that make the first 145,000 useless? 1349 01:56:34,280 --> 01:56:39,180 Absolutely. It will be, it will nonetheless be useful because we will then know how to pivot 1350 01:56:39,180 --> 01:56:42,680 the rest of the site and the rest of the study and the rest of the long range plan. 1351 01:56:43,120 --> 01:56:47,080 Okay, so even if this expense is just at 145,000, the next year is just for gone. 1352 01:56:47,360 --> 01:56:54,320 I'm sorry. So, it just, I'm sorry, because I said useless and you said absolutely. 1353 01:56:54,320 --> 01:56:58,500 I just wanted to make sure we- Oh, I'm sorry. No no, useful. I thought you said useful. 1354 01:56:58,640 --> 01:57:04,900 I'm sorry. I'm still useful even if we don't allocate the 227 and then the following 1355 01:57:05,900 --> 01:57:13,420 600,000 for the design development. Will that be necessary as well? Or will this 145,000 still be useful without? 1356 01:57:14,200 --> 01:57:19,400 Well, the only the only way we would be spending that is if we see the feasibility study is something 1357 01:57:19,400 --> 01:57:21,640 that is necessary and then we would move forward 1358 01:57:21,640 --> 01:57:26,540 to build the actual full plan of that long range site plan. 1359 01:57:26,940 --> 01:57:28,540 Okay, and then I mean, okay. 1360 01:57:29,100 --> 01:57:32,220 And if you're looking at the very long range plan 1361 01:57:32,220 --> 01:57:35,860 of what we would feasibly consider, 1362 01:57:36,580 --> 01:57:37,860 it would include another building, 1363 01:57:38,200 --> 01:57:39,500 but at this point in time, 1364 01:57:40,120 --> 01:57:42,660 we don't, we're not even certain that we can do it 1365 01:57:42,660 --> 01:57:43,940 with what we have underneath. 1366 01:57:44,640 --> 01:57:47,180 So, okay, and do we know the shelf light 1367 01:57:47,180 --> 01:57:48,440 of feasibility plans? 1368 01:57:48,440 --> 01:57:49,240 I'm sorry. 1369 01:57:49,500 --> 01:57:51,380 Do we know the shelf life of these plans? 1370 01:57:51,720 --> 01:57:56,040 Say we do these plans and then decide it's a project we want to tackle in five years. 1371 01:57:56,240 --> 01:58:00,260 What we need to, you know, much like with a downtown parking garage, where we need to redo 1372 01:58:00,260 --> 01:58:03,320 them in five years if we decide to postpone the larger project? 1373 01:58:03,680 --> 01:58:08,360 I don't think that this part of what we're looking to fund would need to be re-done as I said. 1374 01:58:08,740 --> 01:58:12,960 Those buildings were put there at some 40, some years ago. 1375 01:58:12,960 --> 01:58:21,900 And so knowing what is underneath and knowing the actual, let's say, 1376 01:58:22,360 --> 01:58:25,760 sturdiness of the structures, et cetera, is something that is necessary 1377 01:58:25,760 --> 01:58:27,480 any way long term. 1378 01:58:27,840 --> 01:58:29,760 Okay, okay, thank you, that's really helpful. 1379 01:58:29,960 --> 01:58:34,200 And then just, you know, to staff, it feels to me like the feasibility study 1380 01:58:34,200 --> 01:58:36,000 is spread out over two years. 1381 01:58:36,400 --> 01:58:40,960 So knowing that when we're looking at 145, it's kind of paired with an additional 1382 01:58:40,960 --> 01:58:44,720 about 227 in the following year would be helpful 1383 01:58:44,720 --> 01:58:46,880 when we're making the decisions on. 1384 01:58:48,280 --> 01:58:49,320 Thank you. 1385 01:58:51,020 --> 01:58:51,160 Thank you. 1386 01:58:51,160 --> 01:58:52,320 Councilman McBrume. 1387 01:58:53,360 --> 01:58:53,980 Thank you, Mayor. 1388 01:58:55,560 --> 01:58:58,000 Deputy Director of Morocco is 1389 01:58:58,000 --> 01:59:01,200 a possible to get a project by project breakdown. 1390 01:59:03,730 --> 01:59:06,510 And do you think that would be useful for us to see? 1391 01:59:07,430 --> 01:59:09,610 And I assume these numbers come from some spreadsheet 1392 01:59:09,610 --> 01:59:17,590 you have and maybe it's an overwhelming amount of information, but is that something that 1393 01:59:17,590 --> 01:59:18,090 Council could? 1394 01:59:18,150 --> 01:59:18,530 For sure. 1395 01:59:18,710 --> 01:59:22,370 We could, we're just kind of going off a prior year, it's just, we used to just provide 1396 01:59:22,370 --> 01:59:27,730 the highlights and in the full budget book that I'll be available on October 9th, we'll have 1397 01:59:27,730 --> 01:59:34,410 all the projects listed in that book towards the end and they all tie out to the categories 1398 01:59:34,410 --> 01:59:35,490 that you see here. 1399 01:59:36,010 --> 01:59:38,570 But, you know, for next year, for the capital workshop, 1400 01:59:38,730 --> 01:59:41,070 if we want to see the numbers tied out by category, 1401 01:59:42,230 --> 01:59:43,410 we could definitely do that as well. 1402 01:59:43,750 --> 01:59:45,650 And for the second and third workshops too, 1403 01:59:45,810 --> 01:59:46,650 if that's more helpful. 1404 01:59:46,910 --> 01:59:47,830 Okay. Yeah, the reason why I asked, 1405 01:59:47,950 --> 01:59:49,570 and going through this for several years now, 1406 01:59:49,930 --> 01:59:52,090 you know, the CIP sometimes can have 1407 01:59:52,090 --> 01:59:53,570 be hard for people to get their arms around 1408 01:59:53,570 --> 01:59:56,230 because it's not like the operating budget 1409 01:59:56,230 --> 01:59:58,250 where it's like we have to pay for these things. 1410 01:59:58,410 --> 01:59:59,550 It's meant to be flexible. 1411 02:00:00,000 --> 02:00:28,640 And we may not spend all this money and we may go through an economic recession and have to, but you know, at the same time, you know, kind of go, like councilwoman Jane, councilman White, sometimes we look at these numbers and it's like, what am I missing here, you know, here's what we think is coming in and this is what we think we're going to spend it on and it sometimes seems like we're missing a lot of pieces here. 1412 02:00:29,460 --> 02:00:32,440 I'm going to count and I like to tie out the numbers two so I get it. 1413 02:00:32,460 --> 02:00:33,660 I like to make sure they all add up. 1414 02:00:33,720 --> 02:00:34,260 And is it correct? 1415 02:00:34,640 --> 02:00:38,460 There's 40 million or 50 million that's unfunded out of the two 11. 1416 02:00:39,100 --> 02:00:39,660 Is that right? 1417 02:00:41,640 --> 02:00:42,080 What was that? 1418 02:00:43,000 --> 02:00:47,120 Is there a portion of the capital of the CIP that's unfunded? 1419 02:00:47,340 --> 02:00:51,320 Like that we don't see revenue for, that we're going to have to borrow for. 1420 02:00:51,600 --> 02:00:55,420 That's where we have the issuance is plugged in for the utility funds. 1421 02:00:55,420 --> 02:01:05,400 we're still kind of finalizing the funding for capital projects, MFT, we let in the budget 1422 02:01:05,400 --> 02:01:09,940 book we will have when we finalize the numbers there is a cash balance summary, which 1423 02:01:09,940 --> 02:01:15,540 would show if we, you know, have any funding deficits there, that's provided every year. 1424 02:01:16,000 --> 02:01:16,280 Okay. 1425 02:01:16,340 --> 02:01:18,360 But we're still finalizing tweaking that. 1426 02:01:19,200 --> 02:01:19,700 Thank you. 1427 02:01:20,420 --> 02:01:21,760 That's been Wilson. 1428 02:01:24,460 --> 02:01:25,440 I hit the button again. 1429 02:01:26,160 --> 02:01:28,520 I'm trying to turn the microphone off. 1430 02:01:29,600 --> 02:01:31,740 Yeah, no, I guess the councilman at the groom's point. 1431 02:01:32,280 --> 02:01:34,660 I certainly appreciate it. 1432 02:01:34,660 --> 02:01:38,500 I guess to talk about the transportation point again. 1433 02:01:39,060 --> 02:01:40,660 I know the roadway improvements. 1434 02:01:40,920 --> 02:01:43,040 I guess I always forget about those until they happen. 1435 02:01:44,340 --> 02:01:48,180 But I certainly like to look at them more in detail. 1436 02:01:50,660 --> 02:01:57,060 just sort of to beat the dead horse, but I know it's complain about the roadways projects 1437 02:01:57,060 --> 02:02:03,260 in the past and we don't typically obviously get a whole lot of bids, should say obviously, 1438 02:02:03,440 --> 02:02:12,080 but we don't get many bids for them, but certainly to credit you guys, the roads here are much 1439 02:02:12,080 --> 02:02:20,760 better than other cities, but at the same time, if we could try to, you know, again, alleviate 1440 02:02:20,760 --> 02:02:23,640 some of the construction, especially this year or so. 1441 02:02:24,320 --> 02:02:24,800 Thank you. 1442 02:02:27,340 --> 02:02:29,100 That's all for the questions on this one. 1443 02:02:37,840 --> 02:02:38,140 All right. 1444 02:02:38,440 --> 02:02:39,660 That would be back to be mayor. 1445 02:02:40,340 --> 02:02:46,840 Next up, Riverwalk, where we have 7.6 million in capital investment plan, of this amount, 1446 02:02:46,840 --> 02:02:52,800 About 6.8 million is being allocated to the South Extension and Hillside Gateway Projects. 1447 02:02:52,800 --> 02:02:58,460 Riverwark Foundation, as Mr. Kennedy noted, was able to secure external funding of roughly 1448 02:02:58,460 --> 02:03:00,260 1.5 million for the project. 1449 02:03:01,320 --> 02:03:05,580 Although the proposed budget includes a full 6.8 million dollars for the South Extension 1450 02:03:05,580 --> 02:03:12,000 and Hillside Gateway, the Commission has begun discussions with the Riverwark Consultant 1451 02:03:12,000 --> 02:03:16,260 about what a reduced scope and associated costs may look like. 1452 02:03:17,140 --> 02:03:20,540 Mr. Kennedy said, you know, kind of originally, the thought was that 1453 02:03:20,540 --> 02:03:26,800 a self-extension, absent hillside would be about 3 million and they raised one and a half 1454 02:03:26,800 --> 02:03:32,060 and, you know, leaving the other million and a half of the city that numbers increase significantly. 1455 02:03:33,680 --> 02:03:38,940 So, ERA will be looking at that and presenting their results to the riverwalk consultant. 1456 02:03:39,720 --> 02:03:48,340 As a result of that in their recommendation, a revised estimate for this project could be put into the budget before coming back due for final approval. 1457 02:03:49,700 --> 02:03:55,520 The remaining $750,000 spread across the number of projects, completion of 430 South Washington, 1458 02:03:56,520 --> 02:04:03,700 Rift Replacement on Webster Street Cover Bridge and Replacement of Rory Hill Irrigation System. 1459 02:04:09,780 --> 02:04:16,680 Next up, Downtown Parking, kind of a busy slide provides a five-year view of the proposed 1460 02:04:16,680 --> 02:04:21,240 Downtown Capital Investments, which total approximately $6,2.1 million. 1461 02:04:22,960 --> 02:04:27,340 We'd like to move back to something that Councilman McBroom said, hey, you know what? 1462 02:04:27,460 --> 02:04:29,540 We haven't been talking about municipal debt. 1463 02:04:30,280 --> 02:04:33,520 First I heard about it was a month ago, that's absolutely correct. 1464 02:04:35,040 --> 02:04:43,960 In last year's CIP, we had about 4 million in for FY 28 and 29. 1465 02:04:45,240 --> 02:04:50,520 When we looked at all of the downtown projects, it became apparent to say, hey, you 1466 02:04:50,520 --> 02:04:56,600 know what we can't have municipal center deck out at any time while the nickels parking 1467 02:04:56,600 --> 02:04:59,700 deck is going to be out or down. 1468 02:05:00,820 --> 02:05:14,920 So that's when kind of like the three big competing projects, streetscape, nickels deck, and city deck, that's when we kind of had to make the decision to say, all right, how can we sequence these? 1469 02:05:14,920 --> 02:05:24,080 You know, street scape plus city parking deck works, street scape plus nickels parking deck does not, 1470 02:05:24,700 --> 02:05:30,040 too much disruption, nickels parking deck plus municipal parking deck does not, 1471 02:05:30,340 --> 02:05:33,160 because taking too many slots out of service. 1472 02:05:34,420 --> 02:06:02,520 So we went, you know, through the exercise of sequencing these, we tried to minimize the kind of impact on the downtown, and, you know, looking at the three major ones, you know, putting the municipal center deck, and then the streetscape for Jefferson and Maine running those concurrently. 1473 02:06:02,520 --> 02:06:09,820 was able to knock those two out without having what we believe to be significant disruption 1474 02:06:09,820 --> 02:06:13,400 before moving on to the nickels parking deck. 1475 02:06:14,440 --> 02:06:18,940 We thought this would be a better opportunity to balance the impact of the work on downtown 1476 02:06:18,940 --> 02:06:25,740 businesses, residents, visitors, and also considering cash flow and capacity staff. 1477 02:06:27,080 --> 02:06:33,420 streetscape projects have already been underway, they have established momentum, and this 1478 02:06:33,420 --> 02:06:38,280 will allow us to continue that, at least along the Jefferson Peace, provide additional 1479 02:06:38,280 --> 02:06:43,820 time to evaluate the long-term downtown parking strategy and design of the Nichols Parking 1480 02:06:43,820 --> 02:06:47,900 Facility, which is a largest investment of these. 1481 02:06:48,400 --> 02:06:52,880 And the current proposed schedule for Nichols Tech would have concept design and engineering 1482 02:06:52,880 --> 02:06:59,380 taking place in 27 through 30 followed by approximately 36 million in construction, a 1483 02:06:59,380 --> 02:07:00,840 happening in 31 and 32. 1484 02:07:03,700 --> 02:07:07,380 You know, you might be wondering, you know, why would we go back 1485 02:07:07,380 --> 02:07:11,680 to look at design if we already have an approved concept? You know, as we spoke about this before, 1486 02:07:14,000 --> 02:07:18,660 you know, the updates to the old plan. We're very significant. I know there's been a lot of 1487 02:07:18,660 --> 02:07:24,440 about kind of shelf life of plans, and you can get a few years out of those, we approve 1488 02:07:24,440 --> 02:07:32,040 in that you can't get 19 years out of them, just because of the things that we don't 1489 02:07:32,040 --> 02:07:40,700 control such as international building code. From a parking standpoint, we also have additional 1490 02:07:40,700 --> 02:07:48,640 data that's being analyzed that can help with the downtown parking discussion. One, we 1491 02:07:48,640 --> 02:07:51,580 and survey show it a reasonable level of satisfaction. 1492 02:07:53,000 --> 02:08:00,000 Our Ted Group also conducted a separate parking downtown parking survey in July, and those 1493 02:08:00,000 --> 02:08:03,740 results were going to be expected in October, November, and that's going to be another 1494 02:08:03,740 --> 02:08:07,040 important data point for our planning purposes. 1495 02:08:08,820 --> 02:08:12,200 We talked about the timing with this parking deck. 1496 02:08:12,860 --> 02:08:14,440 Why is it a little bit of a surprise? 1497 02:08:15,040 --> 02:08:18,620 Well, because within the last month, it was moved up by 1498 02:08:18,620 --> 02:08:25,100 year and you know we usually talk about kind of the upcoming year. So I wanted to explain that. 1499 02:08:25,640 --> 02:08:33,520 You know temporarily temporarily closing spots here and on the south side of the river impact 1500 02:08:33,520 --> 02:08:40,660 what happens on the north as well as vice versa. So you know staff felt it best to do the Jefferson 1501 02:08:40,660 --> 02:08:43,100 streetscape alongside music, municipal, 1502 02:08:45,180 --> 02:08:48,660 and then pushing out nickels. 1503 02:08:50,420 --> 02:08:52,060 Let's see. 1504 02:08:52,720 --> 02:08:57,380 The other factor that we believe we can work out with this. 1505 02:08:57,800 --> 02:09:03,660 But certainly, if council would like us to do something different, we can absolutely 1506 02:09:03,660 --> 02:09:12,240 that is that this works with kind of like a staff timing and staff involvement as well trying to kind of spread that out. 1507 02:09:12,740 --> 02:09:17,440 You know, it wasn't our intended delay projects because we want to get them all done. 1508 02:09:18,820 --> 02:09:28,540 We just don't want to overburden the downtown and also, you know, city staff would do many projects at the same time. 1509 02:09:29,360 --> 02:09:34,700 Now, if that didn't completely confuse you, I was going to turn over to continue the discussion 1510 02:09:34,700 --> 02:09:40,020 and have Tracy talk about the actual funding of the downtown projects. 1511 02:09:43,800 --> 02:09:44,140 Thanks Doug. 1512 02:09:44,660 --> 02:09:49,500 This next slide shows how these proposed parking deck projects, just the parking deck projects 1513 02:09:49,500 --> 02:09:54,740 on the streetscape, are funded, and how those funds are allocated to be transparent. 1514 02:09:55,560 --> 02:09:59,520 In a few minutes, we will talk about the funding sources for downtown parking. 1515 02:09:59,520 --> 02:09:59,960 Oh 1516 02:10:00,000 --> 02:10:05,160 Which includes terminal sales tax in the downtown food and beverage. The project shown here represents a 1517 02:10:05,160 --> 02:10:12,820 approximately $48.4 million in total costs between 2027 and 2032. Of that amount, approximately 1518 02:10:12,820 --> 02:10:19,340 $30.7 million is proposed to come from the downtown parking fund and $17.7 million from the capital 1519 02:10:19,340 --> 02:10:25,960 projects fund. Municipal Center deck rehabilitation is budgeted at $9 million. The proposed split is 1520 02:10:25,960 --> 02:10:33,520 50% downtown parking and 50% capital projects, which equates to $4.5 million dollars allocated to each fund. 1521 02:10:34,420 --> 02:10:40,400 The 5050 allocation reflects that city hall and a percentile library employees use this deck heavily during the week. 1522 02:10:41,300 --> 02:10:48,700 This allocation is staff's recommendation at this time when the project comes back to city council we can re-evaluate the proposed 5050 split. 1523 02:10:48,700 --> 02:10:57,080 For the nickels library parking facility, we propose allocating 2-3rds from the downtown parking fund and 1-3rd from the capital projects fund. 1524 02:10:57,760 --> 02:11:04,500 This equates to a $25.1 million from the downtown parking fund and $12.6 million from the capital projects fund. 1525 02:11:05,360 --> 02:11:13,580 Not included on this slide, but important to note is that the water street deck was constructed as part of the larger water street redevelopment. 1526 02:11:13,580 --> 02:11:17,980 The parking deck was funded through various sources, including water street tiff dollars, 1527 02:11:18,200 --> 02:11:21,360 downtown parking fund, as well as a public private partnership. 1528 02:11:23,060 --> 02:11:29,840 The downtown parking deck maintenance budget is budgeted, sorry, $1.7 million over the next several years. 1529 02:11:30,240 --> 02:11:35,200 The proposed allocation is also two thirds downtown parking and one-third capital projects, 1530 02:11:35,560 --> 02:11:40,000 which equates to an allocation of $1.1 million and $600,000 respectively. 1531 02:11:40,960 --> 02:11:46,880 The CIP also includes one elevator maintenance project for the parking deck at a cost of $40,000. 1532 02:11:47,840 --> 02:11:51,860 The proposed split is also two thirds downtown parking and one third capital projects. 1533 02:11:53,990 --> 02:11:55,930 And with that, we'll answer questions on this section. 1534 02:11:56,350 --> 02:11:57,450 Council, what else are? 1535 02:11:57,670 --> 02:11:58,310 Thank you, Mayor. 1536 02:11:58,950 --> 02:12:02,710 First of all, I'm going to ask Mr. Kennedy to come back up. 1537 02:12:03,190 --> 02:12:06,070 And Ms. LaClosha was hoping that you could put up his. 1538 02:12:06,770 --> 02:12:14,150 Actually, you know what I'm going to ask Doug if you could go back to the Riverwalk slide and then as soon as we get through that 1539 02:12:14,150 --> 02:12:16,270 I went into, I'm going to this for Kennedy slides. 1540 02:12:17,130 --> 02:12:33,770 Okay, so one thing I wanted to make sure is really clear is a few years ago there was a discussion of the private donations or outside donations being about half of a three million dollar spend on the trail. 1541 02:12:33,770 --> 02:12:44,190 One thing to be really clear about is that was the trail, what's being talked about here is two separate projects, which is a South Extension, the trail, and the hillside gateway. 1542 02:12:44,370 --> 02:12:51,050 So if you factor the gateway out of that, the Delta there's not nearly as extreme as it would seem. 1543 02:12:51,150 --> 02:12:57,310 So it didn't grow from 3 to 6.8 million. This is mixing an apple and an orange, and I see that director careers nodding. 1544 02:12:57,550 --> 02:13:00,690 So I just want to make sure that's out there. 1545 02:13:00,690 --> 02:13:05,650 Um, and then with that, I was hoping Miss Lakoshi could put up the slides, Mr. Kennedy. 1546 02:13:15,590 --> 02:13:15,630 All right. 1547 02:13:15,930 --> 02:13:18,390 And would you mind just flipping through, I think, uh, 1548 02:13:18,790 --> 02:13:20,750 thing Mr. Kennedy, you had slide one up there. 1549 02:13:20,930 --> 02:13:24,750 But I'm not sure if you got to click through any of them. 1550 02:13:25,530 --> 02:13:28,190 You know, just maybe three seconds, the slide would be good. 1551 02:13:34,740 --> 02:13:35,220 Yeah, sure. 1552 02:13:35,300 --> 02:13:35,780 Hello, everybody. 1553 02:13:35,980 --> 02:13:37,740 Thank you for, Ian, for the question. 1554 02:13:37,880 --> 02:13:39,280 And I really rushed through. 1555 02:13:39,380 --> 02:13:41,140 I felt the pressure of that three minutes. 1556 02:13:41,140 --> 02:13:45,760 So there's really, say, hello to everybody last time, but sure. 1557 02:13:46,360 --> 02:13:51,420 Yeah, so just as background, Pat was the chair of the Revok 1558 02:13:51,420 --> 02:13:55,120 Commission, great chair for a number of years. 1559 02:13:56,840 --> 02:14:01,460 I have been on the commission since the beginning of my time 1560 02:14:01,460 --> 02:14:02,520 as a council member. 1561 02:14:04,360 --> 02:14:07,280 And the concern I really want to bring up tonight 1562 02:14:07,280 --> 02:14:09,040 is with regard to process. 1563 02:14:12,040 --> 02:14:13,900 So, when, first of all, Mr. County, 1564 02:14:14,060 --> 02:14:17,720 when did this strip of land between, 1565 02:14:17,720 --> 02:14:21,780 Edward Hospital, roughly, and Dunkin Donuts, 1566 02:14:22,020 --> 02:14:24,820 like when did that become land for the River Walk? 1567 02:14:25,080 --> 02:14:26,860 Could you repeat that? 1568 02:14:27,520 --> 02:14:29,240 The boundary for the River Walk 1569 02:14:29,240 --> 02:14:31,560 to my understanding was extended in 2015. 1570 02:14:31,560 --> 02:14:40,700 Okay, so there's 25 numbers because when the planning for the start, right, and then can you flip to the slide that shows the the overhead view map? 1571 02:14:42,200 --> 02:14:47,200 Okay, so if you can see the dunk and donuts on the right side of that screen. 1572 02:14:47,900 --> 02:14:59,960 Okay, correct me from wrong, but dunk and invested funds in building a retaining wall with that riverwalk trail, you know, basically the city made them do that for the riverwalk, correct? 1573 02:15:00,210 --> 02:15:23,830 That's right. Okay. So just to be clear, we're not just talking about funds that Edward has invested in this, or that representative Yang Roar has secured for the city, but private businesses relying on the city's mandate also invested funds in this river walk extension. So I just want to make sure, you know, that is clear. 1574 02:15:24,910 --> 02:15:31,030 As far as process and you can correct me if I need it wrong at any of these dates, it's been a long time on this commission. 1575 02:15:31,670 --> 02:15:39,190 But in 2022 and 2023, our consultants, architects, civil engineers came together, 1576 02:15:39,890 --> 02:15:46,470 and we had months if not years of refinements to this map that came up with a spinal alignment. 1577 02:15:46,470 --> 02:15:55,810 And those refinements included making sure that the lighting was not placed in a way that would be 1578 02:15:55,810 --> 02:15:58,150 injurious to neighboring residences. 1579 02:15:58,950 --> 02:16:06,190 The rules governing the path, ADA accessibility was fixed several times. 1580 02:16:07,670 --> 02:16:13,810 There's a bike path, one thing to note here is this is a safety project, because currently 1581 02:16:13,810 --> 02:16:15,990 if you've walked this, I don't recommend it. 1582 02:16:15,990 --> 02:16:20,050 But if you walked this, you know, the sidewalk is right up against Washington Street. 1583 02:16:20,170 --> 02:16:26,410 You can literally feel cars oozing by if you're on a bike or a, you know, or walking. 1584 02:16:27,030 --> 02:16:31,770 There has been a fatality at Martin and Hills Ed Washington in the last 20 years. 1585 02:16:33,970 --> 02:16:37,810 So anyway, all of these things were discussed at Nazium, right? 1586 02:16:37,810 --> 02:16:40,470 For months and months and months and actually years. 1587 02:16:41,370 --> 02:16:45,950 And we finally landed on this proposal, which just incorporated the feedback of so many 1588 02:16:45,950 --> 02:16:55,730 residents and the project was ready to go in 23 with a bid in 24 and a build in 25. 1589 02:16:56,630 --> 02:17:05,530 It was bumped to 2024 then it was bumped to 2025 now bumped to the discussion that we're 1590 02:17:05,530 --> 02:17:14,590 having now and as you mentioned earlier Edward gave their $800,000 check with the understanding 1591 02:17:14,590 --> 02:17:19,390 that this gateway would open up in conjunction with the opening of their heart facility, which, 1592 02:17:19,730 --> 02:17:20,790 by the way, has passed. 1593 02:17:22,870 --> 02:17:28,950 And, um, uh, representatives in Green War, I called her office today, um, it was news to 1594 02:17:28,950 --> 02:17:34,050 her that we were talking about considering different plans, uh, for this path. 1595 02:17:34,390 --> 02:17:40,630 Um, I bring all this up to say a whole lot of stakeholders invested, really years in the development 1596 02:17:40,630 --> 02:17:49,110 of this path. I heard a comment, I think, director of career, senior manager of career said 1597 02:17:49,110 --> 02:17:54,510 that the commission is looking into other options to be clear. The last commission meeting 1598 02:17:54,510 --> 02:18:03,430 was on September the 8th, and this was not even on the table at that meeting. As late as August, 1599 02:18:03,570 --> 02:18:09,650 I had asked city staff, are there any potential cuts to the budget regarding Riverwalk answer 1600 02:18:09,650 --> 02:18:15,890 was no. Had we known this, the commission could have at least started discussions? So what 1601 02:18:15,890 --> 02:18:21,890 we're talking about when we're talking about going back to a engineering consultant that 1602 02:18:21,890 --> 02:18:28,610 spent years developing this to come to us in a month with some kind of proposed reduction 1603 02:18:29,590 --> 02:18:36,770 to shave off a million dollars is, in my opinion, scrapping the many, many, many pieces of input 1604 02:18:36,770 --> 02:18:38,130 that went into this. 1605 02:18:38,190 --> 02:18:40,050 And if this was going to be an issue, 1606 02:18:40,630 --> 02:18:43,550 this should have been raised, frankly, years ago. 1607 02:18:44,330 --> 02:18:46,790 And many objections, this project were raised. 1608 02:18:47,530 --> 02:18:51,310 And many of the criticisms of it were incorporated 1609 02:18:51,310 --> 02:18:52,710 in the final design. 1610 02:18:53,690 --> 02:18:58,450 So all of that to say, I think it's, well, 1611 02:18:58,610 --> 02:19:00,890 you're a civil engineer, so I'll ask you, Mr. Kennedy, 1612 02:19:01,010 --> 02:19:05,050 do you think it is realistic to think any kind of proposal 1613 02:19:05,050 --> 02:19:11,650 going to come back to us that's vetted in the next two months that's that's going to reduce the cost of this. 1614 02:19:12,970 --> 02:19:19,590 First, just for clarification for the record, Janet Ingwer's contribution was 800 in the hospital 1615 02:19:19,590 --> 02:19:28,010 was 700. We flipped those back and forth a little bit. Relative to the potential phasing of the project, 1616 02:19:28,590 --> 02:19:34,070 I'm all for having consultants. We have great consultants for the river walk and the commission 1617 02:19:34,070 --> 02:19:36,270 does a great job of looking at all the alternatives. 1618 02:19:37,630 --> 02:19:41,450 I'm, you know, as an engineer, I'm always all for looking at alternatives. 1619 02:19:42,390 --> 02:19:47,070 For this particular stretch, you could even, you know, visually look at it on the screen. 1620 02:19:47,230 --> 02:19:54,350 If the commitment is to connect the river walk at that point north of Hillside, bring it 1621 02:19:54,350 --> 02:19:58,350 under the bridge behind the Dunkin Donuts and connect it to the hospital. 1622 02:20:00,110 --> 02:20:10,390 That is, you can visually see, that's going to be 80% of the budget, if not, if not more. The basic infrastructure of putting a path and connecting it. 1623 02:20:10,690 --> 02:20:19,850 The cost of the amenities and benches and landscaping and those other things tend to be smaller portions of a project like this. 1624 02:20:19,850 --> 02:20:27,350 And, you know, so I personally feel like if we're going to follow through and have a project, 1625 02:20:28,290 --> 02:20:33,390 once you defer that and spread that over two years or three years or multiple phases, 1626 02:20:34,070 --> 02:20:38,570 we've already seen the impact that inflation can have on that, but now you're looking at multiple 1627 02:20:38,570 --> 02:20:46,170 mobilizations for smaller portions of that work. So I'm curious to see what comes back, 1628 02:20:46,170 --> 02:20:52,750 if there's phasing that, though that doesn't connect one end to the other and build half of it, 1629 02:20:53,230 --> 02:20:56,150 I don't really know that that fulfills the intent of the project. 1630 02:20:56,490 --> 02:21:05,230 I appreciate that and also I would add if it's, hey, let's cut the ADA accessibility 1631 02:21:05,870 --> 02:21:13,490 or let's cut the safety with the distance to Washington or let's no longer click to the hospital 1632 02:21:13,490 --> 02:21:17,770 or let's waste the improvements the dunk and did in reliance on the city. 1633 02:21:18,490 --> 02:21:20,810 I just don't see any of those as good options. 1634 02:21:21,130 --> 02:21:21,790 So thank you, Mayor. 1635 02:21:22,590 --> 02:21:23,070 I'm from Kelly. 1636 02:21:24,270 --> 02:21:24,750 Thank you, Mayor. 1637 02:21:25,910 --> 02:21:28,850 A couple of different topics I'd like to ask about and talk about. 1638 02:21:28,990 --> 02:21:32,710 I guess maybe I'll start with the river walks since we're on it right now. 1639 02:21:34,270 --> 02:21:35,350 A couple of questions. 1640 02:21:35,890 --> 02:21:37,690 One from Mr. Kennedy, one from staff. 1641 02:21:38,410 --> 02:21:42,330 When you spoke in public form, I think unless I'm concerned, I think I heard you say that we 1642 02:21:42,330 --> 02:21:49,550 are asking for the full project to move forward and I just want to know who is we. Are you on the commission still? 1643 02:21:49,810 --> 02:21:53,930 Is that just you? I'm not on the commission. Is that the royal weir? 1644 02:21:54,310 --> 02:21:57,310 It is mostly me. I'm part of a fundraising group. 1645 02:21:58,710 --> 02:22:00,530 I'll only speak on behalf of myself tonight. 1646 02:22:00,750 --> 02:22:02,050 Thank you for noticing that. 1647 02:22:02,110 --> 02:22:02,790 I just want to be sure. 1648 02:22:02,990 --> 02:22:04,550 And then for staff, I guess. 1649 02:22:04,670 --> 02:22:10,330 So what I heard from Councilman Holtzauer just now is that this was a potential... 1650 02:22:10,330 --> 02:22:31,930 Well, a variety of alternatives was not in front of the commission at their most recent meeting or it sounds like at any point, so where I'm trying to level said my head where did and I don't even see it on the slide, but in your presentation you mentioned the consultant potentially bringing back alternatives, who is it that asked for that to happen? 1651 02:22:31,930 --> 02:22:38,590 Yeah, Andy, probably will be able to better handle it, or Riverwalk, Ref. 1652 02:22:40,670 --> 02:22:41,210 Thanks, Mike. 1653 02:22:41,730 --> 02:22:41,830 Sure. 1654 02:22:42,710 --> 02:22:48,430 The project right now is as budgeted as for the full improvement in the CIP. 1655 02:22:49,190 --> 02:22:55,270 There's been some discussions with the commission chair just about the cost of the project. 1656 02:22:55,930 --> 02:23:04,230 And then, you know, intense phase of the engineering over the last couple of months, and, you know, the most recent estimate that we got was about 1657 02:23:04,230 --> 02:23:14,290 a million dollars more than what the current budget is mostly due to some of the structural men's being more substantial than where I originally anticipated. 1658 02:23:14,570 --> 02:23:23,230 So I think that just burdened the discussion about, you know, what the, you know, right approaches and how we should move forward. 1659 02:23:23,230 --> 02:23:31,830 So, as of right now, the full amount for the entire project is included in the budget, and 1660 02:23:31,830 --> 02:23:36,890 the intent was that we would move forward to bid the project in the next month or two. 1661 02:23:39,210 --> 02:23:43,490 I think that answers it other than I heard that there's been some discussion with the chair. 1662 02:23:43,870 --> 02:23:49,470 Sorry, I guess what I'm maybe my last question for now is, has the commission or advisory 1663 02:23:49,470 --> 02:23:56,130 commission as a body if they take in any sort of a vote to either recommend that we do 1664 02:23:56,130 --> 02:24:02,410 the full project or that we should seek alternatives or I guess where are they as a commission? 1665 02:24:03,250 --> 02:24:03,990 It's clear. 1666 02:24:05,170 --> 02:24:12,850 Yeah, and Deputy Director Heinz, if I help me out with this, I don't believe that a commission 1667 02:24:12,850 --> 02:24:23,290 And as a whole, to look at any votes to kind of look at the options, I don't know if 1668 02:24:23,290 --> 02:24:29,650 at their last meeting they said, hey, I don't know if they took a vote to say, hey, 1669 02:24:29,690 --> 02:24:33,210 we should put the whole 6.8 million forward, but you might know better. 1670 02:24:33,870 --> 02:24:37,870 Now, is this point the commission has not reviewed any other options? 1671 02:24:38,270 --> 02:24:42,730 We did ask the consultant to take a look at that, and so we would bring that to an upcoming 1672 02:24:42,730 --> 02:24:49,210 commission meeting to get the commission's feedback and we'll then happen before 1673 02:24:49,210 --> 02:24:53,090 like I guess I'm trying to figure out how this is going to play out for us then 1674 02:24:53,090 --> 02:24:57,650 is this going to be part of the decision-making matrix that works up three and we'll have 1675 02:24:57,650 --> 02:24:59,970 input from the commission between now and then or 1676 02:25:00,000 --> 02:25:04,160 Or what is your plan and what we're going to do with this? 1677 02:25:05,040 --> 02:25:14,940 Yeah, I don't know if ERA is going to be done with their analysis. No, you thought they would be 1678 02:25:14,940 --> 02:25:23,820 done prior to workshop 3, but I mean, as a stance right now, we have the full 6.8 million in the budget. 1679 02:25:24,620 --> 02:25:32,040 Okay, okay, and then if I could may or on a different topic, so some questions and thoughts 1680 02:25:32,040 --> 02:25:37,780 on the Nichols Library deck, and there's some discussion early on in public form, and 1681 02:25:37,780 --> 02:25:43,280 I'd like to may or I kind of held my thoughts, I want to see what ZF had to say in this chart, 1682 02:25:43,400 --> 02:25:48,960 which was helpful to see how everything's kind of fitting together, you know, it's interesting. 1683 02:25:49,200 --> 02:25:52,900 That's a much larger project now than the streetscape, so only a few years ago, the streetscape 1684 02:25:52,900 --> 02:26:02,100 We're kind of the monster project and the question was whether we would do them or not and when and I'm glad that we have and that we're still going to finish up on those. 1685 02:26:02,260 --> 02:26:17,960 So I think we certainly are certainly are investing a significant amount of money in the downtown through through the streetscapes and now our municipal deck for me the question on the nickel stack is less about the timing and more whether we should do it or not. 1686 02:26:17,960 --> 02:26:23,940 And I heard mostly positive feedback I guess from Council during public forum, but for what 1687 02:26:23,940 --> 02:26:29,780 it's worth I'll give maybe the contrary and view on it, and I'll do that saying that I've 1688 02:26:29,780 --> 02:26:34,020 been the liaison on deck for the whole time I've been on Council, and they've been talking about 1689 02:26:34,020 --> 02:26:39,020 this deck for pretty much the whole time I've been on Council for many years now, and I've 1690 02:26:39,400 --> 02:26:44,280 heard the pleas for it from the business owners and the private owners, and I understand it 1691 02:26:44,280 --> 02:26:48,400 certainly, and I'm sensitive to those requests. 1692 02:26:49,560 --> 02:26:52,220 My thought is for, and I've got a lot of thoughts on it, 1693 02:26:52,280 --> 02:26:56,220 but my overarching thought is for almost a $40 million project. 1694 02:26:57,520 --> 02:27:00,940 It really should be something that we decide one way or the other 1695 02:27:00,940 --> 02:27:04,520 based on the data and the real need of it. 1696 02:27:04,920 --> 02:27:09,100 And Mr. Krieger mentioned that we've got one data, 1697 02:27:09,160 --> 02:27:11,620 but really only one data point so far I would argue, 1698 02:27:11,620 --> 02:27:17,160 which is a city survey that came in with, I believe it was 12%, 1699 02:27:17,180 --> 02:27:20,700 said it was poor, and 88% said it was better, 1700 02:27:20,800 --> 02:27:22,480 either excellent good or fair. 1701 02:27:22,660 --> 02:27:23,900 I think we're the three other categories. 1702 02:27:24,860 --> 02:27:28,400 So when you've got 88% saying it's, 1703 02:27:28,400 --> 02:27:32,180 I would argue, okay, at least, if not better than that, 1704 02:27:33,260 --> 02:27:37,300 to invest 37 million that seems like an awful lot, 1705 02:27:38,280 --> 02:27:41,280 I'll say just from one you walk around town, 1706 02:27:41,280 --> 02:27:47,460 I really never see the decks that we've already got being full, but that's just visual, not 1707 02:27:47,460 --> 02:27:48,140 data, right? 1708 02:27:48,320 --> 02:27:51,240 I'm very curious to see what staffs data will show. 1709 02:27:51,640 --> 02:27:56,220 I've been told, and it was just mentioned earlier that we're going to have some actual 1710 02:27:56,220 --> 02:28:00,400 data and information regarding the usage rates on the decks that we have. 1711 02:28:01,040 --> 02:28:08,320 For one, I'll be very surprised if it shows that they're ever full, even on the busiest days. 1712 02:28:08,320 --> 02:28:12,520 I just don't think that they are, and I think that's for a few reasons. 1713 02:28:12,520 --> 02:28:16,320 One, I'm just not sure there's the need, and two people don't love parking in decks. 1714 02:28:16,620 --> 02:28:17,940 I think we hear that all the time. 1715 02:28:18,100 --> 02:28:23,000 I think that's one reason the nickel's lot is as popular as it is right now. 1716 02:28:23,100 --> 02:28:25,120 And so hard to get a spot, because people will circle. 1717 02:28:25,260 --> 02:28:31,820 We all hear people circle for the surface flat parking spaces, and don't want to go to the top levels of the decks. 1718 02:28:32,520 --> 02:28:37,580 So to replace it with a deck, I just don't really see it. 1719 02:28:37,580 --> 02:28:42,800 But what we've heard is that there's a need, but we've also heard that downtown visitors 1720 02:28:42,800 --> 02:28:47,280 are at the most they've ever been, over the past few years, it continues to grow and grow. 1721 02:28:47,940 --> 02:28:51,360 It certainly doesn't seem like parking has been an impediment to that. 1722 02:28:51,740 --> 02:28:54,540 Our food and beverage taxes continue to grow. 1723 02:28:55,700 --> 02:29:01,800 And when we think about the future, I just don't know that I see trying to make downtown 1724 02:29:01,800 --> 02:29:10,100 a more car centric area as what we necessarily want to be doing and how we've grown but 1725 02:29:10,100 --> 02:29:15,180 the parking satisfaction is higher than it used to be is kind of an open question but one 1726 02:29:15,180 --> 02:29:19,640 thought and it's just a thought but you know we approved happy hour to come back to Naperville 1727 02:29:19,640 --> 02:29:25,600 and hurt on the basis that we've got much more right share and maybe that's a piece of this is 1728 02:29:25,600 --> 02:29:30,740 that you've got more right share, more car pulling, more walking biking, there may not be 1729 02:29:30,740 --> 02:29:34,380 I think, hey, we're downtown, suburban destination. 1730 02:29:34,520 --> 02:29:36,580 There's always going to be people that want to drive here. 1731 02:29:36,760 --> 02:29:41,840 Obviously, cars aren't going the way, but directionally it seems like people are driving 1732 02:29:41,840 --> 02:29:46,980 and parking a car on their own less than they used to be. 1733 02:29:47,980 --> 02:29:52,980 So I'm just not there on this, especially considering the costs and granted it continues to 1734 02:29:52,980 --> 02:29:57,240 go up if people are committed to wanting to do it, then sure, probably should be done sooner 1735 02:29:57,240 --> 02:29:59,820 rather than later, because it will cost less. 1736 02:30:00,000 --> 02:30:29,760 And for what it's worth if a majority council wants to do it, I hope that you do it in the way that, as visually pleasing as it could be done, I would not support, let's scale it back or make it taller, get rid of the pocket part, because it might save some money. I would say if we're going to do it, we should do it right. I, for one, would say yes, include the pocket part, include the bells and whistles on the outside, make it look nice. Because that is a concern I have to that you're really going to change your character in the downtown. If you build this, in my opinion, not for the better. 1737 02:30:31,560 --> 02:30:40,740 So that's my position, I just don't think the need has been proven and so to just kind of go along with it because it's been a part of a discussion for a long time for $40 million. 1738 02:30:41,380 --> 02:30:45,240 If we don't need it, I'm just not there. 1739 02:30:45,560 --> 02:30:51,960 And so my question I guess is process wise, what a staff you for this will this be a decision. 1740 02:30:52,820 --> 02:30:59,120 Matrix at the final budget workshop is it's going to be a standalone agenda item at some point. 1741 02:30:59,120 --> 02:31:05,380 I would argue we haven't really had a full presentation from staff and if and when we do 1742 02:31:05,380 --> 02:31:09,480 it should certainly include that data, that staff is accumulating, so I mean is that 1743 02:31:09,480 --> 02:31:14,820 going to be an agenda item before the budget might get approved or in the next year. 1744 02:31:15,000 --> 02:31:19,060 I mean there's only 100,000, but I also think it would be helpful for both the business 1745 02:31:19,060 --> 02:31:21,980 community and residents to know if we're going to do this or not. 1746 02:31:22,740 --> 02:31:27,540 For me, I wouldn't even want to do 100,000 to be honest if we weren't going to do it. 1747 02:31:27,540 --> 02:31:30,060 if the Council is committed to doing it, then fine. 1748 02:31:30,740 --> 02:31:33,520 But I don't want to just keep dragging it out and say, well, 1749 02:31:33,540 --> 02:31:34,940 we'll talk about it in five years. 1750 02:31:35,140 --> 02:31:36,380 We'll do a hundred thousand now. 1751 02:31:36,840 --> 02:31:39,000 I think at some point some Council's got to decide 1752 02:31:39,000 --> 02:31:41,220 whether we're going to do this big picture-wise or not. 1753 02:31:41,420 --> 02:31:43,140 But I don't know what your plan is for the near-term 1754 02:31:43,140 --> 02:31:44,280 if we're going to make that decision. 1755 02:31:49,010 --> 02:31:53,690 So we won't have the results of the data collection 1756 02:31:53,690 --> 02:31:56,190 that we completed in July ready as part 1757 02:31:56,190 --> 02:31:58,970 of this budget process in order to present that. 1758 02:31:59,570 --> 02:32:04,090 I would anticipate that that's going to be coming, you know, kind of after we have our next workshop. 1759 02:32:04,830 --> 02:32:14,010 So, you know, we're targeting October, it might be November, it's including development projections, customer service data, as well as our parking occupancy data. 1760 02:32:14,010 --> 02:32:20,130 So, it's a lot to pull together, and in the past we've brought a pretty substantial report. 1761 02:32:20,270 --> 02:32:27,170 I think from the last time we actually brought a full report was in 2015 and I actually don't think we've brought it until around January or November or the following year. 1762 02:32:27,170 --> 02:32:29,830 So we definitely are trying to get this one to you faster. 1763 02:32:30,070 --> 02:32:34,190 I think a couple of kind of key points with the schedule 1764 02:32:34,190 --> 02:32:36,310 that we have, we are deep in the design 1765 02:32:36,310 --> 02:32:39,610 on the Jefferson streetscape with the intent of constructing it. 1766 02:32:39,690 --> 02:32:41,650 Next year, that hasn't changed. 1767 02:32:43,130 --> 02:32:46,010 I think public works is well on the way to getting ready 1768 02:32:46,010 --> 02:32:49,170 for the Municipal Center, Zachary Habs. 1769 02:32:49,350 --> 02:32:51,570 So I think there are pieces of this plan that 1770 02:32:53,230 --> 02:32:55,430 and move forward as planned. 1771 02:32:55,870 --> 02:32:59,390 And then, as we refine the conversation around the Nichols 1772 02:32:59,390 --> 02:33:00,690 Daccan, as we hear more feedback, 1773 02:33:00,690 --> 02:33:04,150 and we bring this data point, I think we can refine the decision 1774 02:33:04,150 --> 02:33:06,330 as it relates to the future phases of streetscape, 1775 02:33:06,450 --> 02:33:08,410 being Chicago and Jackson. 1776 02:33:10,110 --> 02:33:13,250 So I think as Doug mentioned, we're here to hear the feedback 1777 02:33:13,250 --> 02:33:16,530 on this, and we can kind of work through the discussion 1778 02:33:16,530 --> 02:33:18,990 on how we sequence those, but I think as far as the municipal 1779 02:33:18,990 --> 02:33:24,230 second, Jefferson Street, scapegoals, those are going to be pretty ready to go for construction 1780 02:33:24,230 --> 02:33:25,190 for next year. 1781 02:33:25,650 --> 02:33:31,770 So my last song, if I could, I would really ask that we get that data and I would suggest 1782 02:33:31,770 --> 02:33:36,390 it should be a council meeting agenda item where the public would be aware and it's not 1783 02:33:36,390 --> 02:33:40,470 just something as part of the budget process that we're just going to say 40 million is approved 1784 02:33:40,470 --> 02:33:42,410 by a show of hands and a workshop. 1785 02:33:43,150 --> 02:33:48,370 I think we should have that data, have a full meeting, have the neighborhood aware, have 1786 02:33:48,370 --> 02:33:52,330 everybody come to a meeting and really discuss it before any final decisions made. 1787 02:33:53,330 --> 02:33:54,410 Thank you, Councilwoman Jane. 1788 02:33:55,010 --> 02:33:55,590 Thank you, Mayor. 1789 02:33:57,270 --> 02:34:00,970 I won't become, I too will be talking about the parking decks. 1790 02:34:01,310 --> 02:34:05,310 Not making any comments in general about where I stand. 1791 02:34:05,910 --> 02:34:13,990 But I do agree with Councilman Kelly on data being important and helping us make these decisions. 1792 02:34:13,990 --> 02:34:24,630 And so I do appreciate Mr. Krieger, your reasoning behind the shift in the timeline and the projects that you propose. 1793 02:34:26,450 --> 02:34:35,650 I would like to also see the results of that survey before we make any decisions, including the municipal center deck. 1794 02:34:35,650 --> 02:34:58,450 For me, I guess you may have spoken to this earlier, but if you could clarify the urgency or if their structural needs that need to be attended to right away or is this something that could be delayed, if you could just speak to that. 1795 02:35:00,000 --> 02:35:19,620 I love to look for Mr. Randolph to see. If I miss speak, you know, last year we had it slated in for 2028, 2029, I do not believe anything, has changed to make it more urgent, kind of the acceleration of that by one year was really just part of the coordination. 1796 02:35:19,620 --> 02:35:27,120 So if it, I mean if it pushed one year, assuming that wouldn't be a big issue, I'm guessing 1797 02:35:27,120 --> 02:35:30,960 we could probably push two, but probably wouldn't want to go beyond that. 1798 02:35:31,280 --> 02:35:31,860 Is that fair? 1799 02:35:35,380 --> 02:35:40,840 I would want to consult the structural report before I provide feedback on that. 1800 02:35:41,360 --> 02:35:47,460 In my experience, you don't want to put off maintenance to waterproofing membranes on 1801 02:35:47,460 --> 02:35:49,280 a structural debt. 1802 02:35:50,820 --> 02:36:07,880 But, yes, if it was slated for 28, 29 and we are accelerating it for logistical reasons or, you know, then that's a real consideration, but I will have an information for the council. 1803 02:36:07,880 --> 02:36:11,120 So, yeah, thank you. 1804 02:36:12,840 --> 02:36:13,800 Councilman Maybroum. 1805 02:36:14,380 --> 02:36:14,860 Thank you, Mayor. 1806 02:36:16,380 --> 02:36:19,040 Don't quickly back just briefly back to the Riverwalk. 1807 02:36:19,420 --> 02:36:21,300 Appreciate Councilman Kelly's questions. 1808 02:36:21,460 --> 02:36:22,200 I was a little confused. 1809 02:36:22,320 --> 02:36:23,820 I'm what we were talking about. 1810 02:36:24,520 --> 02:36:27,360 Just for my own clarity, director Heinz, 1811 02:36:28,340 --> 02:36:32,440 the full projects in the CIP budget. 1812 02:36:33,420 --> 02:36:36,680 What's the concern that we're talking about here that we think that 1813 02:36:36,680 --> 02:36:43,800 bid may come in higher than what we're budgeting for and it's a buy a million dollars, or is that what we're talking about? 1814 02:36:44,420 --> 02:36:53,640 Yeah, so the final design, you know, the latest cost estimate is more than what we budgeted for, so I think the question was, you know, do we need to look at other options? 1815 02:36:54,500 --> 02:36:55,620 Buy a million dollars. 1816 02:36:55,880 --> 02:36:56,840 Approximately yes. 1817 02:36:57,340 --> 02:36:57,500 Okay. 1818 02:36:58,400 --> 02:36:59,820 Doesn't seem insurmountable. 1819 02:37:00,740 --> 02:37:02,320 But, okay. 1820 02:37:03,500 --> 02:37:04,380 Thank you for that. 1821 02:37:04,380 --> 02:37:11,900 As far as the parking deck goes, I agree with the Councilman Kelly on the transparency and the data. 1822 02:37:12,620 --> 02:37:19,500 I guess the calendar to the need, I have seen a lot of data from DNA and Chamber of Commerce. 1823 02:37:20,620 --> 02:37:28,120 And I think it's, you know, the people that these business owners want in those parking spots aren't necessarily necessarily in our 1824 02:37:28,120 --> 02:37:35,720 available survey. They don't live here. And I look at it as what 380, 400 new shoppers. 1825 02:37:37,460 --> 02:37:43,980 And I just think we should keep that in mind. You know, it is very expensive to run a city. 1826 02:37:44,760 --> 02:37:56,440 And in order to keep that property tax levy low comparatively to our other communities, we need economic activity. 1827 02:37:56,440 --> 02:38:06,620 We need economic growth and so I understand fully why these downtown business owners want an avenue to get more vehicles downtown 1828 02:38:08,080 --> 02:38:13,880 But I think I think you're a hundred percent right. I'd like to see a staff recommendation 1829 02:38:15,240 --> 02:38:16,520 You know 1830 02:38:16,520 --> 02:38:22,060 You take guidance from us and we kind of push you in different directions on on the budget 1831 02:38:22,060 --> 02:38:27,060 But $40 million spend getting data and getting a staff recommendation on it. 1832 02:38:27,280 --> 02:38:32,420 I think, and having a public form and notifying the public and getting more feedback. 1833 02:38:32,680 --> 02:38:34,800 I mean, it's not a small thing. 1834 02:38:35,480 --> 02:38:42,920 My last concern would be, you know, and along the lines of the $100,000, we can say $100,000 is meaningless. 1835 02:38:43,140 --> 02:38:47,600 But I was kind of the same way when we first started talking about this when I thought that the engineering plans, 1836 02:38:48,240 --> 02:38:53,460 million and a half bucks that we don't just throw that in the CIP and thus we're really 1837 02:38:53,460 --> 02:38:58,000 serious about doing that. We should probably treat a hundred thousand dollars like that as 1838 02:38:58,000 --> 02:39:03,760 well. Now a lot of us might not be here about the time we get to two thousand thirty one and to 1839 02:39:03,760 --> 02:39:11,400 vote on it but you know so and lastly since I've been sitting up here I've kind of seen maybe a 1840 02:39:11,400 --> 02:39:20,780 during theme a little bit, where we've had extensive permit delays, we've looked at opportunities 1841 02:39:20,780 --> 02:39:27,220 like Fifth Avenue, having to be pushed off, and I'm starting to feel like, and this is 1842 02:39:27,220 --> 02:39:28,160 nothing against staff. 1843 02:39:28,300 --> 02:39:32,360 I think that you guys are doing a great job, but I think your job is mostly reactionary, and 1844 02:39:32,360 --> 02:39:36,880 it's preventing anyone from really taking the time or having the ability to do any forward 1845 02:39:36,880 --> 02:39:43,120 looking, and so I think about things like being told that we can't pursue a fifth avenue 1846 02:39:43,120 --> 02:39:49,360 development, hundreds of millions of dollars of development, and then I look at this timeline 1847 02:39:49,360 --> 02:39:53,820 and say, well, if you're going to do a parking deck in 2030 and we start talking about fifth 1848 02:39:53,820 --> 02:39:59,960 we're going to be told we can't do that, so, you know, I think council when we get to 1849 02:40:00,000 --> 02:40:24,440 I think that our planning and engineering is probably at capacity, and I don't think they're able to tackle multiple projects, and I think we're seeing some of that in the CIP, and so I'm going to be supporting whatever it takes to get our planning department, the resources they need to be able to take advantage of investment opportunities for us. 1850 02:40:24,440 --> 02:40:26,780 So, Councilman Wilson? 1851 02:40:27,940 --> 02:40:28,660 Thank you, Mayor. 1852 02:40:29,860 --> 02:40:32,220 Didn't turn off the microphone this time. 1853 02:40:33,980 --> 02:40:37,480 I guess similar thoughts and thank you, Councilman. 1854 02:40:37,520 --> 02:40:42,080 Holds our for the background on the riverwalk. 1855 02:40:42,260 --> 02:40:45,740 Some of which, I guess I wasn't aware of, 1856 02:40:45,900 --> 02:40:47,460 or had needed to be reminded by it. 1857 02:40:48,960 --> 02:40:57,320 But I guess similar to getting data for the nickels library parking deck, I mean, maybe 1858 02:40:57,320 --> 02:41:01,180 this is just a counterfactual, but I would be curious if it, I don't know, I get 1859 02:41:01,180 --> 02:41:12,340 possible to see how much utilization that small stretch of, I guess, the block would actually 1860 02:41:12,340 --> 02:41:13,640 be used. 1861 02:41:14,540 --> 02:41:14,860 I don't know. 1862 02:41:14,940 --> 02:41:17,440 To me, it's just, and again, I guess, kind of, 1863 02:41:17,440 --> 02:41:22,820 going back here to the theme of, you know, delaying things longer is going to increase the cost. 1864 02:41:24,320 --> 02:41:35,350 But, um, at the same time, just six, seven million dollars for, um, small piece of, uh, land, 1865 02:41:35,650 --> 02:41:43,350 when I'm not entirely sure how much it would be utilized, is expensive to me, um, I mean, you know, 1866 02:41:43,350 --> 02:41:50,150 But whereas you can argue that the parking deck at the nickels library, you can make a very 1867 02:41:50,150 --> 02:41:57,110 good argument that it would bring in more people to downtown businesses, which is certainly 1868 02:41:57,110 --> 02:42:04,170 the downtown business community's argument would bring in more revenue, which would certainly 1869 02:42:04,170 --> 02:42:04,950 be appealing. 1870 02:42:05,430 --> 02:42:11,010 I guess kind of the councilman Kelly's point, I would be interested though in having like, I don't 1871 02:42:11,010 --> 02:42:17,090 what that would look like as far as like a public hearing or because it does seem like some 1872 02:42:17,090 --> 02:42:23,610 of these projects like this would like, you know, a few years down the line, the public ends 1873 02:42:23,610 --> 02:42:28,530 up getting developed and then the public is like, oh, this is almost 40 million dollars 1874 02:42:28,530 --> 02:42:34,930 in there like, I didn't even know about it. So I don't know, to that point, I would be interested 1875 02:42:34,930 --> 02:42:36,930 and seeing feedback like that. 1876 02:42:37,130 --> 02:42:39,190 So, thank you. 1877 02:42:39,590 --> 02:42:41,470 Mr. Krieger, I'm going to start with just a couple of questions 1878 02:42:41,470 --> 02:42:44,990 about the history of the River Walk in this particular extension. 1879 02:42:45,990 --> 02:42:48,930 You've been around for this entire discussion going back 1880 02:42:48,930 --> 02:42:51,550 to 2015, I believe, when it first started. 1881 02:42:52,290 --> 02:42:57,450 Was it your understanding that there was some sort of fundraising 1882 02:42:58,550 --> 02:43:00,490 expectation from the River Walk Foundation 1883 02:43:01,330 --> 02:43:03,910 and the city would do a match or what 1884 02:43:03,910 --> 02:43:04,910 what's your recollection? 1885 02:43:05,850 --> 02:43:07,610 And, you know, thank you for the question. 1886 02:43:08,290 --> 02:43:14,330 You will not find anything in writing and, you know, Mr. Kennedy may be able to add on 1887 02:43:14,330 --> 02:43:20,190 as well, you know, so there were no, there are no formal commitments or obligations. 1888 02:43:20,850 --> 02:43:26,190 My understanding, at least with the South Extension, and thank you for clarifying, you 1889 02:43:26,190 --> 02:43:30,710 know, you know, it didn't double in value, that includes both the Healthside Gateway as 1890 02:43:30,710 --> 02:43:30,950 well. 1891 02:43:30,950 --> 02:43:37,790 you know, it certainly wasn't my intention to show that and it goes back, I don't know, maybe 1892 02:43:37,790 --> 02:43:42,410 probably like the full 10 years where we think, hey, you know, we think this was about 3 million 1893 02:43:43,490 --> 02:43:50,310 and, you know, foundation was created, said, hey, all right, you know, I don't think they stopped 1894 02:43:50,310 --> 02:43:57,210 at the 1.5, I think it was just the hey, we hit the 1.5, you know, you add hillside gateway in, 1895 02:43:57,210 --> 02:44:02,310 that increased costs, you know, as Deputy Director Heinz mentioned, 1896 02:44:02,330 --> 02:44:05,250 you know, increasing the size of some of the structural elements 1897 02:44:05,250 --> 02:44:07,690 that increased costs, costs are always getting increased. 1898 02:44:08,130 --> 02:44:10,530 That's, you know, that's not anybody's fault. 1899 02:44:11,110 --> 02:44:13,930 That's just kind of the way it has been going. 1900 02:44:15,570 --> 02:44:21,730 But, you know, I think the informal original thought was kind of like a 50-50 deal, 1901 02:44:22,930 --> 02:44:25,590 but you're not going to find that in writing anywhere. 1902 02:44:25,590 --> 02:44:28,030 I don't know was that consistent. 1903 02:44:29,410 --> 02:44:29,790 Mr. Kennedy? 1904 02:44:33,950 --> 02:44:34,130 Yes. 1905 02:44:34,250 --> 02:44:34,950 Thank you. 1906 02:44:35,270 --> 02:44:35,490 Yeah. 1907 02:44:35,750 --> 02:44:37,470 I'd say that was the intention. 1908 02:44:38,170 --> 02:44:44,430 And so now we are a fundraising group within the Neighborville River Walk Foundation. 1909 02:44:44,730 --> 02:44:47,150 And we have been actively working. 1910 02:44:47,190 --> 02:44:52,650 If you look back at the projects that have been accomplished through the Master Plan, 1911 02:44:52,830 --> 02:44:57,190 I think we're at this point over 50% as they've kind of all. 1912 02:44:58,210 --> 02:44:59,590 come through different. 1913 02:45:02,400 --> 02:45:15,220 Entities, repfosters, representative fosters, grant and some of the other projects along the river bank ecological restoration projects that have been funded with other people's money. 1914 02:45:16,280 --> 02:45:19,660 So we've worked hard at that and we'll continue to work at our fundraising. 1915 02:45:20,660 --> 02:45:29,080 There are still opportunities for different naming rights in those types of things, even during construction and even 1916 02:45:29,080 --> 02:45:41,800 as the project moves forward, and in fact, we believe with support and with approval and with momentum for the project moving forward that will kind of put some wind in our sales as a fundraising group as well. 1917 02:45:44,080 --> 02:45:51,740 So right now we're at the two donations, the 700 and the 800, the grant from the state and the 700 donation from 1918 02:45:51,740 --> 02:45:57,700 Yeah, that's basically the extent of all private donations at this point for this project. 1919 02:45:58,060 --> 02:45:59,740 For this specific project, that's correct. 1920 02:45:59,960 --> 02:46:09,320 And I will, in 2023, in the look ahead CIP budget, and based on our consultants, the budget for the project was $3 million. 1921 02:46:09,840 --> 02:46:14,300 And so that's kind of the basis for how we raise the $1.5 million. 1922 02:46:14,760 --> 02:46:21,080 And again, I think maybe the project needs a little bit momentum to support further fundraising around it as well. 1923 02:46:23,160 --> 02:46:33,670 Director Heinz, when it comes to the six point eight, number you've got in here, what do you have for padding there? 1924 02:46:34,030 --> 02:46:37,470 I mean, we haven't had a Riverwalk project in the last three and a half years. 1925 02:46:37,650 --> 02:46:39,070 I've been on the council that's hit budget. 1926 02:46:40,030 --> 02:46:41,110 They've always gone over. 1927 02:46:41,370 --> 02:46:44,970 The last one we had was over seven digits in change orders. 1928 02:46:45,930 --> 02:46:52,590 So is it six point eight or is it nine point eight? 1929 02:46:53,750 --> 02:47:01,750 I think, you know, it's 6.8 is a reasonable number, I mean, we won't know what the market conditions are at that exact time. 1930 02:47:02,190 --> 02:47:08,150 But I will say, you know, going back in time a little bit, you know, we've had three major projects over the last few years. 1931 02:47:08,630 --> 02:47:13,910 The Eagle Street Gateway, which we only had two bidders, and that did commence significantly over budget. 1932 02:47:15,530 --> 02:47:20,750 The North Central College Park, we had better luck, so we did get five bidders, and actually 1933 02:47:20,750 --> 02:47:29,310 the low bid was pretty significantly underneath the engineer's estimate, so that's good news, 1934 02:47:30,130 --> 02:47:32,490 but we'll have to see how the South Extension goes. 1935 02:47:32,790 --> 02:47:37,430 It's a bigger project, so I'm not sure if it's going to generate the same number of bidders, 1936 02:47:37,510 --> 02:47:43,750 but hopefully it will, and I think the 6.8 million is a reasonable number at this point. 1937 02:47:44,390 --> 02:47:52,270 And is there funding established in this number for the continued care and feeding of the new addition to the river walk? 1938 02:47:52,530 --> 02:47:55,270 What would that look like on an annual basis, do you know? 1939 02:47:55,930 --> 02:47:59,210 We do have an estimate for that number. 1940 02:48:00,070 --> 02:48:04,630 It's not, you know, that's an operating budget, not the capital budget. 1941 02:48:04,970 --> 02:48:06,690 So I don't know the number off the top, 1942 02:48:11,560 --> 02:48:11,560 Matt. 1943 02:48:11,560 --> 02:48:22,560 With regard to the downtown parking garage project, I think Councilman Miproom brought up a very good point. 1944 02:48:24,160 --> 02:48:35,080 Ms. Conners stated very early on the record 60% of the visitors the downtown for shopping and dining are estimated to be from out of town visitors. 1945 02:48:35,080 --> 02:48:43,700 And I'm not aware of any of our data capture through the National Community Survey plan that was only mailed to Naperville Residence. 1946 02:48:45,060 --> 02:48:45,980 Select number. 1947 02:48:46,300 --> 02:48:50,480 And then this new opt-in plan survey. 1948 02:48:51,440 --> 02:48:54,560 Theoretically, somebody doesn't have to live in Naperville to fill that out. 1949 02:48:55,020 --> 02:48:58,340 But if they have to have the initiative to fill it out of that, be accurate. 1950 02:48:58,980 --> 02:48:59,220 Ms. Lodge? 1951 02:49:03,300 --> 02:49:05,600 On the community survey, I'm looking over it. 1952 02:49:06,260 --> 02:49:10,360 I'm talking about the special parking survey that was, it's currently in progress. 1953 02:49:10,540 --> 02:49:14,400 National Community Survey was absolutely an April of residence only and only a portion of them. 1954 02:49:14,600 --> 02:49:15,440 Yeah, thank you for the clarification. 1955 02:49:16,080 --> 02:49:25,960 So, yeah, that was available to any downtown patron, as well as it was promoted to retailers and employees of the, of the retailers in the downtown as well. 1956 02:49:26,120 --> 02:49:33,160 So, that was, we, we had QR codes available, broadcast all over the downtown during that time frame where we were doing those parking counts. 1957 02:49:33,160 --> 02:49:37,500 So that was open to any downtown visitor at that time, as well as promoted through our 1958 02:49:37,500 --> 02:49:38,260 typical channels. 1959 02:49:38,700 --> 02:49:43,960 So not at all limited to just a city of Naperville residents. 1960 02:49:45,360 --> 02:49:45,460 Okay. 1961 02:49:45,560 --> 02:49:50,860 In my understanding, in different presentations, I've seen is that we are well below the 1962 02:49:50,860 --> 02:49:57,820 parking ratios for a number one, a downtown with the number of stores and square footage 1963 02:49:57,820 --> 02:49:59,900 dedicated to retail and restaurant. 1964 02:50:01,120 --> 02:50:10,400 As compared to other cities and our true competition, is that still accurate? 1965 02:50:13,710 --> 02:50:23,810 Yeah, I would say that is that is accurate. I know that is what, you know, the data that was prepared by DNA and DAX showed, you know, they were using some benchmarks. 1966 02:50:24,770 --> 02:50:28,830 historically, the city has used its own downtown parking 1967 02:50:28,830 --> 02:50:31,690 generation rate, which is very close to what they were using. 1968 02:50:33,030 --> 02:50:38,310 So the last time we did the full report, we did provide an estimate of 1969 02:50:38,310 --> 02:50:42,050 2.0 to 2.5 spaces per thousand square feet, and that excludes any 1970 02:50:42,050 --> 02:50:43,070 residential development. 1971 02:50:43,790 --> 02:50:47,950 So we were using a similar ratio at that point, which did show that 1972 02:50:47,950 --> 02:50:51,590 based on the amount of commercial square footage that there was a 1973 02:50:51,590 --> 02:50:53,510 need from additional parking spaces. 1974 02:50:55,050 --> 02:50:55,190 OK. 1975 02:50:56,290 --> 02:50:58,830 And when it comes to the streetscape improvement plan, 1976 02:50:59,850 --> 02:51:04,530 how many spaces are we taking offline during that project? 1977 02:51:07,160 --> 02:51:10,720 For the Jefferson and Main Street streetscape 1978 02:51:10,720 --> 02:51:13,200 it was total of 36 on street spaces. 1979 02:51:13,900 --> 02:51:16,200 That will be gone through the duration of the project 1980 02:51:17,100 --> 02:51:19,080 or when the project is over. 1981 02:51:19,080 --> 02:51:29,980 That those would be unavailable while the project is underway. I mean, depending on staging, we might not have to take all of those out at one time, but the maximum during construction would be 36. 1982 02:51:30,680 --> 02:51:42,540 Okay, and Mr. Hines, do we know how many would be out of service at City Hall or one of you? Mr. Randolph? 1983 02:51:43,400 --> 02:51:48,340 Yeah, the project is split over two years. It would be one half at a time. 1984 02:51:48,340 --> 02:51:50,580 So one half one year and one half the other. 1985 02:51:50,980 --> 02:51:52,180 What does that equate to, approximately? 1986 02:51:53,360 --> 02:51:58,620 It's half a 370, about 170. 1987 02:51:59,380 --> 02:52:01,000 I'm learning from Director Loudon. 1988 02:52:01,380 --> 02:52:05,940 So theoretically, we're taking 200 spaces offline at the same time. 1989 02:52:06,800 --> 02:52:07,100 Yes. 1990 02:52:08,080 --> 02:52:11,400 Without any sort of replacement for those spaces, correct? 1991 02:52:13,720 --> 02:52:20,040 So, you can kind of see where I'm going with this as far as the concerns. 1992 02:52:20,920 --> 02:52:24,800 One way or the other, we're going to have parking challenges with that project. 1993 02:52:24,940 --> 02:52:28,460 We're going to have parking challenges if we decide to build a parking garage. 1994 02:52:29,380 --> 02:52:32,520 But I think there's something more and beyond that. 1995 02:52:32,620 --> 02:52:38,020 And that is by the end of this year, we're estimated to have about 16 million dollars in a downtown parking fund 1996 02:52:38,020 --> 02:52:40,920 that was dedicated for more parking. 1997 02:52:40,920 --> 02:52:49,520 And, if we're not going to build that more parking, why are we collecting $16 million in special 1998 02:52:49,520 --> 02:52:58,200 tax revenues from food and beverage in the downtown specifically for the downtown parking 1999 02:52:58,200 --> 02:53:03,540 fund, if we're not going to ever build the facility. 2000 02:53:03,540 --> 02:53:11,000 I mean, we should be getting rid of that tax or given the money back if we're never going 2001 02:53:11,000 --> 02:53:14,980 to build a facility that we promised or that was in the cards long ago. 2002 02:53:15,800 --> 02:53:19,260 So I've got some great concerns about what we're doing there. 2003 02:53:19,480 --> 02:53:27,520 And quite frankly, I mean, the last piece of my concern would be the downtown parking fund 2004 02:53:27,520 --> 02:53:31,900 being used for maintenance on the municipal parking garage deck. 2005 02:53:31,900 --> 02:53:39,500 I mean, we just heard, it mentioned that city employees use that, the nickels library 2006 02:53:39,500 --> 02:53:44,660 employees use that, and neighbor settlement employees, and neighbor settlement uses it. 2007 02:53:44,940 --> 02:53:50,660 And not one of those groups pays into that downtown parking fund. 2008 02:53:52,560 --> 02:53:58,900 So to suggest that we're going to use half of the, half of the funding for repairs in the 2009 02:53:58,900 --> 02:54:04,660 of municipal center parking garage and tap the downtown parking fund for it. 2010 02:54:04,940 --> 02:54:11,620 I just don't think it's the appropriate use of those funds as this was pitched to the 2011 02:54:11,620 --> 02:54:17,360 retailers and the restaurant owners who made the investment in our downtown many years ago 2012 02:54:17,360 --> 02:54:23,460 under the guys they would be collecting these taxes, they would be increasing their prices to 2013 02:54:23,460 --> 02:54:26,480 to have parking for their customers. 2014 02:54:27,860 --> 02:54:32,200 So I think it's just not an appropriate budget allocation. 2015 02:54:34,470 --> 02:54:35,050 Thank you. 2016 02:54:35,290 --> 02:54:35,810 Councilman, how's it? 2017 02:54:35,910 --> 02:54:36,530 Do you got a follow-up? 2018 02:54:36,650 --> 02:54:38,770 Thank you, Mayor, just had a couple of follow-up questions 2019 02:54:38,770 --> 02:54:40,290 for Mr. Kennedy. 2020 02:54:41,470 --> 02:54:42,350 He looks excited. 2021 02:54:45,860 --> 02:54:47,400 I think he said it earlier, Mr. Kennedy, 2022 02:54:47,680 --> 02:54:49,060 but just wanted to verify. 2023 02:54:50,260 --> 02:54:53,220 Had this project been approved in the, I'm sorry, 2024 02:54:53,220 --> 02:54:59,300 If it had been, yeah, approved in the CIP and the original year it was proposed, not delayed. 2025 02:55:00,000 --> 02:55:03,740 Half funding for the path was covered by private donors, correct? 2026 02:55:04,980 --> 02:55:10,940 I'm sorry, I missed the, okay, sorry, if this had been approved in the year that it was first proposed. 2027 02:55:11,780 --> 02:55:15,880 You had half, 1.5 million dollars was half of the net in cost. 2028 02:55:16,260 --> 02:55:16,740 Correct. 2029 02:55:17,080 --> 02:55:19,740 We've had an inflation in the cost of materials and construction. 2030 02:55:21,260 --> 02:55:25,100 And now the whole site gateways been added in, but that's tossed that out. 2031 02:55:25,100 --> 02:55:34,300 But the actual cost of the path, the issue we now have is a inflation in the cost of goods and construction correct, or that's a major issue. 2032 02:55:36,240 --> 02:55:47,620 Is it fair to say it's a hard sell to go back to the donors and say we now want to maintain one-half private donations on a reason for that is that we delayed the project for three years. 2033 02:55:48,760 --> 02:55:51,220 And we want you to cover the inflation for us. 2034 02:55:51,280 --> 02:55:53,000 Is that fair to say that's a hard ask? 2035 02:55:53,940 --> 02:55:58,260 Yeah, I can't speak for the leadership at the hospital. 2036 02:55:58,640 --> 02:56:07,180 I know they were disappointed when it was deferred to this point, and they expressed that, but I can't speak to them. 2037 02:56:08,280 --> 02:56:13,820 Being the person who's gone back to them each time and sat down and talked to them after each deferral. 2038 02:56:14,300 --> 02:56:17,160 Yeah, those are uncomfortable conversations, so I wouldn't look forward to that. 2039 02:56:17,160 --> 02:56:28,920 Okay, and then just as a, you know, following up on Councilman Brune's point, he talked about the $1 million being, or sorry, the cost being 1 million more than anticipated. 2040 02:56:29,180 --> 02:56:37,120 I just wanted to make sure that it's clear on the record that that means 6.8 million is 1 million more than we had hoped we had hoped for more like 5.8 million. 2041 02:56:37,120 --> 02:56:41,660 We're using last year's numbers, but yeah, I just just want to make sure let's clear 2042 02:56:41,660 --> 02:56:45,080 us now we're talking about 7.8 million or something like that. 2043 02:56:47,160 --> 02:56:54,960 And then final question is fair to say that in other Riverwalk extension projects or expansion 2044 02:56:54,960 --> 02:57:00,540 projects, when naming rights have been sold to pavilion or squares or things like that, 2045 02:57:00,540 --> 02:57:07,280 Those have generally raised six figure sums, which is donated back to the City for River 2046 02:57:07,280 --> 02:57:10,680 Lock Maintenance Correct, or I'm sorry, is donated back for River Lock Maintenance 2047 02:57:10,680 --> 02:57:11,280 Correct? 2048 02:57:12,160 --> 02:57:17,540 Yeah, any fundraising we do would, the sole purpose of our fundraising committee is for 2049 02:57:17,540 --> 02:57:23,380 Master Plan projects, and this is our focus and our primary objective right now, so 2050 02:57:23,380 --> 02:57:29,460 anything we raised now or even over the next couple of years would go to the city to support 2051 02:57:29,460 --> 02:57:36,360 This project. Yeah, and the final question is just to verify there were $3.5 million dollars of other 2052 02:57:36,360 --> 02:57:44,340 World War war war projects that that the commission shows to defer into the future to prioritize this one correct not only to 2053 02:57:44,340 --> 02:57:51,860 Fur but to look at the extent of those projects as they sit today the scope of those projects and even 2054 02:57:52,580 --> 02:57:58,100 To scope of those projects in other words other projects for cut that's right for this. Okay. Thank you, Mayor 2055 02:57:59,160 --> 02:58:00,120 How's it been Kelly? 2056 02:58:00,640 --> 02:58:00,980 Thank you Mayor. 2057 02:58:01,300 --> 02:58:10,680 A couple of follow-ups on the funding allocation that hasn't gotten a whole lot of discussion but one thing I will agree with you on what I might disagree and then a question for staff. 2058 02:58:12,500 --> 02:58:26,660 For the funding split on the municipal deck I will say I wasn't sure what staff was going to propose there for my perspective when I saw 50 50 I thought that made sense actually because granted it's used by city and settlement employees during the day. 2059 02:58:26,660 --> 02:58:39,960 But then it's of course also used on the top deck during the day for residents, but for shoppers and diners at nights and on the weekends and I'll say that's it's one reason that I don't personally see the nickels deck being 2060 02:58:40,560 --> 02:58:46,020 a necessity because I can always find a spot. I'll say in the municipal deck to me, that's one of the one of the 2061 02:58:47,440 --> 02:58:53,380 It's not a secret, but just a lot of people don't use it, but it's right at water street and right across the river from from the rest of downtown. 2062 02:58:54,080 --> 02:59:02,940 So, that makes sense to me, I will say on the food and beverage tax for the downtown parking 2063 02:59:02,940 --> 02:59:03,820 fund. 2064 02:59:04,000 --> 02:59:04,840 I'll agree with the mayor. 2065 02:59:04,940 --> 02:59:07,460 I think we should only be collecting what we actually need. 2066 02:59:07,480 --> 02:59:09,880 If we are going to do the nickels deck, then we'll need a lot. 2067 02:59:10,740 --> 02:59:15,040 Obviously, if we don't, I would be curious from staff if you could get some information 2068 02:59:15,040 --> 02:59:20,480 for regarding what big ticket items we're going to have over the next many years. 2069 02:59:20,480 --> 02:59:25,220 I know the central parking facility is talked about having to be redone at some point in 2070 02:59:25,220 --> 02:59:30,420 what the potential just very ballpark costs on that might be what that eat up the entirety 2071 02:59:30,420 --> 02:59:34,680 of the fund plus a million per year for the next many years. 2072 02:59:35,460 --> 02:59:40,000 In any case at some point, whenever we've built out the parking that we're going to need, whether 2073 02:59:40,000 --> 02:59:45,380 that's redoing central and or nickels potentially at some point I think it would make sense 2074 02:59:45,380 --> 02:59:49,880 move into a maintenance phase, and maybe we reduce or eliminate that tax. 2075 02:59:50,760 --> 02:59:55,420 The question for staff, I guess, is if you can explain for us how you came to that 5050 proposal 2076 02:59:55,420 --> 02:59:57,060 for the municipal deck? 2077 02:59:58,820 --> 02:59:59,760 Thank you for that clarification. 2078 03:00:00,000 --> 03:00:19,300 You know, it's certainly not a black and it's not a white. For, you know, the city obviously does use that for city business. Should the downtown parking fund be used to assist us in funding city business, absolutely not? 2079 03:00:19,960 --> 03:00:26,960 You know, our thought and Ted has been tasked with this is try to evaluate, you know, kind 2080 03:00:26,960 --> 03:00:32,560 of the percentage usage, you know, and I don't know if it's that because it's used by 2081 03:00:32,560 --> 03:00:33,000 both. 2082 03:00:33,960 --> 03:00:41,420 So, you know, the low it would be zero if it were 100% used by non-sitting non-settlement, 2083 03:00:41,460 --> 03:00:44,280 non-library people, it would be two thirds. 2084 03:00:45,240 --> 03:00:47,060 It's going to be somewhere in between. 2085 03:00:47,420 --> 03:00:50,520 Ted is going to come up with an estimate of use to say, 2086 03:00:50,520 --> 03:00:53,460 you know, hey, on average, it's, 2087 03:00:53,480 --> 03:00:55,180 I'll pick something to make the math easy. 2088 03:00:55,360 --> 03:01:03,480 Say it's 40% used by downtown patrons, 60% used by the city. 2089 03:01:03,680 --> 03:01:06,100 You say, okay, we have the 60%. 2090 03:01:06,800 --> 03:01:10,120 That piece is going to be paid for entirely by the city. 2091 03:01:10,120 --> 03:01:18,020 the remaining 40 percent, two-thirds of that would be paid for by the downtown parking fund, 2092 03:01:18,200 --> 03:01:20,400 and then the remainder would be paid for by the city. 2093 03:01:21,680 --> 03:01:26,500 That is what kind of got us near the 50-50, so it was a little more thought-pop behind it. 2094 03:01:26,580 --> 03:01:28,580 It wasn't just split the difference. 2095 03:01:29,680 --> 03:01:34,560 That is why we don't have kind of an exact percentage because we're still trying to calculate 2096 03:01:34,560 --> 03:01:38,340 the best percentage of use of those spaces. 2097 03:01:38,340 --> 03:01:43,200 And it will receive that you estimate from staff before making final decisions on this. 2098 03:01:43,440 --> 03:01:43,880 Yes. 2099 03:01:44,240 --> 03:01:44,540 All right. 2100 03:01:44,780 --> 03:01:45,780 Thank you. 2101 03:01:48,780 --> 03:01:49,400 It's all the questions. 2102 03:01:51,220 --> 03:01:53,580 That's not all the presentation, though. 2103 03:01:54,700 --> 03:01:57,280 I think Deputy Director Morocco has the next section. 2104 03:01:58,120 --> 03:02:01,820 Just a few more on how we fund capital projects. 2105 03:02:03,680 --> 03:02:05,560 First up, we have the Home Roastail Tax. 2106 03:02:05,580 --> 03:02:09,180 This is a single largest revenue source dedicated to funding capital improvements. 2107 03:02:09,180 --> 03:02:14,500 It was implemented in 2016 as a conscious decision to create a consistent funding source 2108 03:02:14,500 --> 03:02:16,620 to support ongoing capital investment. 2109 03:02:17,180 --> 03:02:22,240 In turn, this allows a city to responsibly manage debt because of that consistent funding source. 2110 03:02:22,860 --> 03:02:26,900 To date, over $13 million in home real sales tax funds have been collected. 2111 03:02:28,000 --> 03:02:34,000 The current tax rate of three quarters of 1% remains the lowest home real sales tax rate of surrounding communities. 2112 03:02:35,420 --> 03:02:40,160 Sorry, I'm just going to add. Home real sales tax, however, does not apply to big ticket 2113 03:02:40,160 --> 03:02:44,760 or essential items like title vehicles, qualifying groceries or medical health care items. 2114 03:02:45,540 --> 03:02:53,640 You will notice that Home real sales tax revenues projected to increase by 3% from 2026 to 2027. 2115 03:02:54,420 --> 03:02:59,960 This increases primarily due to sustained consumer spending and the ongoing impact of inflation. 2116 03:02:59,960 --> 03:03:05,360 Additionally, many municipalities, including Naperville, are benefiting from expanded online sales 2117 03:03:05,360 --> 03:03:09,300 tax collections as consumers continue to spend more online. 2118 03:03:10,220 --> 03:03:16,940 The 2027 budget estimate is $24.8 million up from $24.1 million projected for 2026. 2119 03:03:20,590 --> 03:03:25,970 Well, all right, motorfield tax, motor fuel and local gas taxes are used to fund the city's 2120 03:03:25,970 --> 03:03:31,370 street maintenance program, which includes resurfacing and reconstruction, the motorfield 2121 03:03:31,370 --> 03:03:37,770 tax or MFT is further made up of state MFT and the Transportation Renewal Fund or TRF. 2122 03:03:38,010 --> 03:03:43,750 MFT is a fixed, great per gallon while TRF is adjusted annually based on the consumer price index. 2123 03:03:44,710 --> 03:03:52,010 For 2027, MFT is forecasted at $7.6 million, which is a 4.8% increase from 26. 2124 03:03:52,890 --> 03:03:57,610 The increase is driven by TRF, since motor fuel taxes projected to decline slightly. 2125 03:03:57,610 --> 03:04:03,630 The state is still evaluating how MFT structure may need to evolve in the future, particularly 2126 03:04:03,630 --> 03:04:08,210 as vehicle technology and fuel consumption patterns change. 2127 03:04:09,190 --> 03:04:13,110 For now, staff is taking the wait and see approach at the local level as the state considers 2128 03:04:13,110 --> 03:04:13,890 its options. 2129 03:04:14,890 --> 03:04:19,550 Once the state's direction becomes clear, staff can evaluate whether a similar approach would 2130 03:04:19,550 --> 03:04:21,870 be appropriate or workable at the local level. 2131 03:04:21,870 --> 03:04:25,870 A pervils local gas tax is a flat four cents per gallon. 2132 03:04:26,290 --> 03:04:31,050 Revenors here have remained consistent with past years at around 2.4 million, but 2133 03:04:31,050 --> 03:04:34,410 have yet to return to pre-pandemic levels of 2.7 million. 2134 03:04:35,490 --> 03:04:39,030 More fuel tax revenues will continue to be a closely monitored due to the current 2135 03:04:39,030 --> 03:04:42,210 uneasy oil market and forecasted decline in consumption. 2136 03:04:45,120 --> 03:04:47,280 Next we have the downtown food and beverage tax. 2137 03:04:47,540 --> 03:04:49,200 Business is located downtown. 2138 03:04:49,200 --> 03:04:55,220 Collector remit the additional 3.4% on food and beverage sales in addition to the Citywide 2139 03:04:55,220 --> 03:04:55,900 Tax. 2140 03:04:56,500 --> 03:04:59,920 The downtown food and beverage taxes fully dedicated to the downtown parking. 2141 03:05:00,000 --> 03:05:10,360 Fund to support construction maintenance and improvement of downtown parking facilities. As a chart illustrates, collections have rebounded since 2021 and have been at at approximately one million dollars. 2142 03:05:11,820 --> 03:05:24,660 For 2027, staff is projecting a slight decline of approximately 2% or 20,000 dollars. This projection is based on current collection trends and does not reflect any potential impact from a recent repeal of the happy hour ban. 2143 03:05:24,660 --> 03:05:30,980 Staff will continue to monitor collections and if current trends improve, we will re-evaluate our preliminary estimates. 2144 03:05:34,530 --> 03:05:40,090 All right, last we have capital support. This is another way capital is funded through the issuance of bonds. 2145 03:05:40,750 --> 03:05:44,110 Neighborville is considered a low-deopard and community by our bond rating agencies. 2146 03:05:44,850 --> 03:05:49,690 Our conservative practices on debt issuance is helped maintain this low-deoparden. 2147 03:05:49,910 --> 03:05:55,150 In addition, debt is carefully planned and issued on a reimbursement basis to avoid unnecessary borrowing. 2148 03:05:55,150 --> 03:05:59,150 The result is our prestigious AAA moderating for 30 years. 2149 03:05:59,950 --> 03:06:07,590 The 2027 CIP assumes a planned-ed issuance of nearly $50 million in new utility debt. 2150 03:06:07,810 --> 03:06:12,610 This includes $10 million for the electric utility and $40 million in the water utility. 2151 03:06:13,390 --> 03:06:17,690 It's very important to note that utility debt in the water and electric funds is separate from the general fund. 2152 03:06:18,430 --> 03:06:23,910 As a result of this, the debt that utilities would be taking on has no impact to the property tax levy. 2153 03:06:25,010 --> 03:06:29,970 The 2027 budget includes no new bond issuance for capital outside of the utilities. 2154 03:06:30,950 --> 03:06:35,530 Over the past five years, $15 million has been issued for general capital projects. 2155 03:06:36,190 --> 03:06:40,810 This was included in the 2025 Geobons, along with $30 million for the utilities. 2156 03:06:41,930 --> 03:06:44,730 With that, I'll turn it over to Doug for closing remarks. 2157 03:06:48,160 --> 03:06:48,320 All right. 2158 03:06:48,440 --> 03:06:48,960 Thanks Tracy. 2159 03:06:49,180 --> 03:06:50,080 So what comes next? 2160 03:06:50,520 --> 03:06:55,080 As we talked about previously, we're currently finalizing the proposed budget, which 2161 03:06:55,080 --> 03:07:01,360 will be published on October 9th. We'll include all of the detail. This is a closest we come 2162 03:07:01,360 --> 03:07:07,040 to publishing a phone book here at the city. Our second workshop, scheduled for October 27th, 2163 03:07:07,120 --> 03:07:13,540 is going to cover our operating budget and major funds. And then if needed, third and final budget 2164 03:07:13,540 --> 03:07:25,060 workshop would take place on November 10th, public hearing and approval of the 2027 budget and 2165 03:07:25,060 --> 03:07:32,220 This concludes staff presentation for the evening mayor and we're happy to answer any other additional questions. 2166 03:07:32,460 --> 03:07:33,040 Councillor White. 2167 03:07:33,960 --> 03:07:34,400 Thank you. 2168 03:07:34,660 --> 03:07:35,560 Just a quick question. 2169 03:07:35,960 --> 03:07:37,360 You mentioned a motor fuel tax. 2170 03:07:37,460 --> 03:07:39,640 I've been asking this when he probably knew it was coming. 2171 03:07:40,580 --> 03:07:47,780 What we're doing with the electric vehicle registration, getting some net funding to come back to the city. 2172 03:07:49,300 --> 03:07:51,480 As we mentioned, we're kind of taking away and see a approach. 2173 03:07:51,480 --> 03:07:58,480 I think there was some proposed legislation from the state on additional surcharge for electric 2174 03:07:58,480 --> 03:08:03,580 vehicles, but I think that's still going through the process, so until we kind of see some 2175 03:08:03,580 --> 03:08:04,700 activity at the state. 2176 03:08:04,840 --> 03:08:07,900 I don't think we're ready to take any action at the local level just yet. 2177 03:08:08,540 --> 03:08:08,760 Yes. 2178 03:08:09,120 --> 03:08:13,480 In the whole point, being there charging this forward when we register a car, but we're not getting 2179 03:08:13,480 --> 03:08:18,560 any of that back to the city like we would be if we were actually spending gas money on gasoline 2180 03:08:18,560 --> 03:08:28,860 and we get, we get that money back and it seems like I don't know how many years have brought this up and it's still seen the action on it. 2181 03:08:29,760 --> 03:08:36,160 We continue to track it with the legislation. Other states have done it and they've done it successfully. 2182 03:08:36,760 --> 03:08:44,320 I think it's more important for us here in Naperville because we have such a much higher adoption of electric vehicles. 2183 03:08:44,320 --> 03:08:54,440 So, you know, we've got more cars, and you do mention electric vehicles do pay more to the state for the registration. 2184 03:08:55,040 --> 03:09:02,100 However, the state shares zero of that with us as opposed to somebody buying gas at a gas station where we do get the share. 2185 03:09:02,620 --> 03:09:04,640 But yet, no, we are continuing to track. 2186 03:09:05,540 --> 03:09:07,240 Okay. Thank you. 2187 03:09:07,240 --> 03:09:15,220 comes with my holes. Thank you, Mayor. I was curious why grocery tax revenue wasn't listed as a 2188 03:09:15,220 --> 03:09:22,000 a revenue source on here or dime is it? grocery taxes in the general fund. Okay. Which we cover 2189 03:09:22,000 --> 03:09:28,140 at the last two workshops. Okay. It's operating. Got it. Thank you. And then just final thing I wanted to 2190 03:09:28,820 --> 03:09:37,080 clarify. I thought I heard that you said it direct Morocco. But there are no bonds being issued 2191 03:09:37,080 --> 03:09:38,960 for anything outside of utilities this year. 2192 03:09:39,060 --> 03:09:40,340 No plan, nothing planned. 2193 03:09:40,540 --> 03:09:45,120 Okay, so in other words, balance budget for the CIP stuff outside of utilities. 2194 03:09:46,800 --> 03:09:52,200 We do, you know, as I mentioned, the cash balance summary, you know, that's where we 2195 03:09:52,200 --> 03:09:59,860 would be transparent on any kind of planned spend downs and reserves for funds in prior years. 2196 03:10:00,000 --> 03:10:07,060 We have had that, but nothing at the moment planned to, for general debt outside of the utilities. 2197 03:10:07,340 --> 03:10:08,800 Awesome job, then. Thank you, Mayor. 2198 03:10:10,820 --> 03:10:14,960 All right. Well, folks, thank you very much for all your work on this tonight. 2199 03:10:16,020 --> 03:10:19,720 Our workshop is now concluded, and we will wish everybody a good night.