[0:02] Good evening. I'm going to call to order [0:05] this being May 28th a meeting of the [0:08] committee of infrastructure being held [0:11] this Wednesday again May 28th 2025 at [0:15] 700 p.m. in the automatic chamber and [0:17] duly noted in two places including city [0:21] hall's websites in accordance with [0:23] requirements of RSA 91- semicolon 2 [0:28] Roman numeral 2. Can the clerk please [0:32] take the role? [0:34] Absolutely. Alderman Tibido here. [0:37] Alderman Sullivan here. Alderman Cle is [0:40] here. Alderman Dow [0:43] and Alderman at large O'Brien present. I [0:47] declare a quarum. You have four members. [0:49] Yes. [0:51] Okay. Also in attendance is Mr. Tim [0:55] Cummings, administrative service [0:57] director. [0:58] uh Chief Stephen Buckton of the [1:00] Nashville Fire Rescue and Don Enright. I [1:05] don't know if she's on [1:07] I do not see but uh so we'll keep an eye [1:11] out if she decides to join us. Okay, [1:14] I'll open it up to public comment. [1:17] Anybody have [1:19] any information from the public? Seeing [1:21] none, we'll move on to discussion of [1:24] presentations on fire station facilities [1:28] update and I'll recognize Chief Buckton [1:32] and administrative service director, Mr. [1:34] Tim Cummings. Yes. Thank Thank you, Mr. [1:36] Chairman. Uh, may we approach? You may [1:38] approach. Have a seat. [1:40] They're much more comfortable [1:42] than the benches. [1:48] Commissioner, you want to join them? You [1:49] may. Okay. [1:51] right here and open it in my [1:54] So, uh, as as folks are getting settled [1:56] here for the record, Tim Cummings, [1:58] director of administrative services, uh, [2:00] uh, I'm going to hand it off to Chief [2:02] Buckton in one second, who's going to [2:04] who's going to go into a little bit more [2:05] detail than I am. But to just set the [2:07] table here, um, if you recall, uh, a [2:11] little while back, we set money aside to [2:13] do a master facility planning study, a [2:17] deferred capital maintenance study, if [2:19] you will. Um, and this evening, I [2:22] believe you're going to hear uh some of [2:23] the findings and the work that was done [2:26] over uh the last few months or so. Um, [2:29] the the real genesis behind this [2:32] conversation is because what I'm hoping [2:33] to do as a follow on to this [2:36] conversation is to start to have a [2:38] conversation with you all about [2:40] developing a plan for for funding the [2:43] various uh maintenance needs. Um, I have [2:46] some ideas uh kind of sketched out in [2:49] the back of my mind as to how to [2:50] possibly accommodate it. Uh, but [2:53] obviously, you know, I don't want to get [2:55] too far ahead of myself and I I welcome [2:57] everyone's input here. So, having that [2:59] conversation as uh in followup to this, [3:02] I think will behoove everyone as we do [3:04] want to be good stewards of the of the [3:07] city's assets. So, uh, with that being [3:09] said, Mr. Chairman, I'd like to hand it [3:11] off to uh uh Chief Buckton and uh and [3:14] start the conversation in earnest. Okay, [3:16] Chief Buckton, please. Thank you. Steve [3:18] Buckton, National Fire Chief. Um so, as [3:21] you may remember, we went through the [3:23] process uh to seek out a vendor to [3:25] perform a facility study for us. Uh we [3:28] found some people uh far on the other [3:30] side of the country um over in Seattle [3:33] that actually did the work for us. Um [3:35] Assistant Chief Pulot headed up the [3:37] project. Um the city invested about [3:40] $350,000 for this study. It's very [3:43] comprehensive comprehensive uh and it [3:45] gives us a good pathway forward uh to be [3:48] able to follow for many years for the [3:50] work we need to do to our facilities. Um [3:53] some of it is uh not a surprise to many [3:56] of us, but some of the dollar amounts do [3:58] add up to quite a bit. So uh I'll turn [4:00] it over to Assistant Chief Pulot. uh [4:02] he's worked with these uh two ladies [4:05] here and their team uh quite extensively [4:07] over the past year to get this study [4:09] done. So I'll let them take it away. [4:11] Okay. Before you start uh chief uh and [4:15] to our guests when if you are asked to [4:19] speak can you just identify yourself [4:21] because your new people and the [4:23] transcription people may not know. So [4:26] every time that you go to speak, state [4:29] your name and then it will be duly [4:31] recorded. Chief Fullard, good evening. [4:34] Thank you. So thank you. U as the chief [4:37] said comprehensive study of our [4:39] facilities that includes all six of our [4:41] firehouses, our fire alarm dispatch [4:43] center and our training grounds out of [4:45] the landfill. So it covers eight [4:47] facilities. uh focuses on the building [4:49] itself uh plumbing, electrical, HVAC [4:53] needs and a lot of focus on health and [4:55] safety of our firefighters. Those are [4:57] items like um proper separation between [5:00] apparatus space, living area, uh indoor [5:03] air quality testing, things like that. [5:05] So, the study really covered um pretty [5:08] much every avenue of of living in a fire [5:12] station. And uh to present tonight we [5:15] have Sarah Partap from uh Mang Analysis [5:18] and Sarah Gladex from Rice Fergus [5:21] Miller. [5:24] Hi. Thank you. Um I'm Sarah Partap uh [5:26] from Megan Analysis. Um I want to start [5:30] by just saying hello to everybody and [5:32] thank you to Chief Buckton and Chief [5:34] Pulot for the ask if you could bring the [5:37] microphone a little bit closer to you. [5:39] Yeah. Yeah. Is that better? Yeah. Okay. [5:41] So, thank you to you guys for the [5:43] support through this project. It was a [5:44] large undertaking that required a lot of [5:47] uh background information and support [5:48] while we were on site. As I mentioned, [5:50] it was a very extensive study. We had [5:51] team members on site in every building. [5:53] So, uh they were heavily involved in the [5:56] FCA and the planning process. So, we [5:58] appreciate your time. Um I was the [6:00] project manager of kind of the overall [6:02] project itself and then also of the [6:03] facility condition assessment portion. [6:05] Um and I have Sarah Gladex with me. I'll [6:07] let her introduce herself. [6:09] Hi, good evening. Sarah Gladex. I'm a [6:12] principal and fire station planner with [6:14] Rice Fergus Miller [6:16] Architects. And uh my job was to help [6:19] manage and plan phase two of this [6:22] project, which included understanding um [6:24] the way that you use all of your fire [6:26] facilities and how we can implement [6:28] change to make them better and more [6:30] modernized. Um and to uh as Chief Pulat [6:33] mentioned uh ensure health and and [6:35] safety and wellness of of firefighters [6:37] now and into the future. [6:40] All right, Sarah Partap again. We might [6:43] go back and forth. Do we We're going to [6:45] go back and forth on some slides. So So [6:46] we just keep that That would be fine. [6:48] Okay. Um so this is just kind of an [6:50] overview of what we were hoping to go [6:52] through tonight in our agenda. Uh we [6:54] will be brief in some of these. So feel [6:56] free to ask us questions at the end and [6:57] we can dive deeper into whatever topics [7:00] you have questions about. So first, [7:01] would you mind questions on topic as [7:04] you're going through or do you want to [7:06] wait to the end? [7:08] Either would be fine. Whatever you're [7:10] comfortable with, we could go either [7:12] way. I think it's okay. If it if it [7:14] starts to get to be like one and [7:15] another, then maybe we pause it till the [7:17] end. I think we got a good group. I [7:19] think they'll, you know, stay on focus. [7:22] This is the best committee in the city. [7:24] Yeah. Oh, good. Well, we're glad we're [7:25] on this one. [7:28] Um, all right. So, we're going to start [7:30] with just sort of the purpose of this [7:32] project and the methodology. We will [7:33] give you like highlevel findings sort of [7:35] trends across the whole portfolio of [7:37] buildings. Then we'll get into some [7:39] specifics about each facility and then [7:41] summarizing the different types of costs [7:43] and what those costs are toward the [7:45] end. So the the context for this project [7:48] is the city and uh Nashville Fire Rescue [7:51] has undergone additional preparatory [7:53] work before doing this study. So in 2021 [7:55] there was a master plan which reviewed [7:58] you know the fire service overall [7:59] station locations and kind of laid out a [8:01] big plan for the future. Um, from that [8:03] you guys went into the strategic plan [8:05] which had specific items to follow up or [8:07] how you're going to achieve this vision [8:09] and one of those was a facility study so [8:12] you can document all of your backlog of [8:13] maintenance and move forward with [8:15] decision-m for which to repair, which to [8:17] replace etc. So that's where we came in [8:20] for the facility condition assessment [8:22] and then the long range plan was the [8:23] phase two of our project which is taking [8:25] the condition data and wrapping it into [8:27] little digestible packages of what are [8:29] your options for upgrading and repairing [8:30] each station. [8:34] Uh so just a quick overview about the [8:36] facility condition assessment process. [8:38] Uh we had a team of specialists that [8:39] were from uh architectural, mechanical [8:42] engineer, electrical engineer, [8:43] structural engineer uh and a civil [8:45] engineer. And additionally we had a firm [8:48] who specializes in hazardous materials [8:49] testing on board to do uh hazardous [8:52] materials and air quality testing at [8:54] select stations. Um the site assessments [8:56] occurred in the summer of 2024. Uh we [8:59] were on site for about uh a week. We did [9:02] one we did a a one pilot uh in in June [9:05] and then we were back on site in August [9:06] to get through the rest of the stations. [9:08] Um some of the terminology that I'll use [9:10] tonight, observe deficiencies. That's [9:12] one that I'll use a lot. Uh that's [9:14] talking about issues that are either [9:16] noted by our surveyors while they're on [9:18] site or they're disclosed to them. Say [9:20] if it's a roof a roof leak, but we were [9:22] there in the summer, you guys could tell [9:23] us there's a roof leak, we would we [9:25] would note that. and they're things that [9:26] are need to be repaired within five [9:28] years and that have a direct cost of at [9:30] least [9:31] $5,000. Uh our longer term costs from [9:33] the facility condition assessment are [9:35] called predicted renewals and that's [9:37] more of like a statistical model of what [9:38] we would expect you to need to pay based [9:40] on your building types and the ages of [9:42] the systems. What you would need to pay [9:44] over 20 years across your whole building [9:46] portfolio rolled up. So this year you [9:48] need a million two. This year you might [9:50] need five million. So we we forecast [9:52] that out 20 years into the future. [9:57] Sarah Gladex from Ricebergus Miller. Uh [9:59] the process that we use for phase two um [10:02] starts with a needs assessment which is [10:04] asking you um a thousand questions [10:07] understanding what the department needs [10:09] right now and what you envision you [10:11] might need into the future. Um and what [10:13] your overarching goals are for [10:15] department um that also go handinhand [10:17] with the goals of the city. Um we [10:20] conduct a handful of programming [10:22] workshops which we ask even more [10:24] questions and get into um kind of the [10:27] the high level and into the detail um of [10:30] each facility that we're looking into. [10:33] Um and from that we are able to uh [10:36] prepare some diagrams that will help [10:38] with a conceptual understanding of what [10:41] your current facility is lacking and how [10:43] we can make it better um from a very [10:45] high level. Um and then a square footage [10:48] analysis which helps us understand how [10:50] much square footage do you have overall? [10:52] What does each room have? And then it [10:54] starts to show us what are the gaps um [10:56] in spaces that you don't have that you [10:58] may need um in order to house your [11:00] equipment. Um make sure you have enough [11:02] sleeping rooms for your firefighters. Um [11:05] and then uh planning narratives which [11:07] are more written um narratives that are [11:09] useful for a professional cost estimator [11:11] to take um and start putting some [11:14] conceptual dollars um to each of these [11:16] projects. Um uh and then that will [11:19] inform um what what we think these [11:21] conceptual cost estimates will look [11:23] like. Um and not just hard costs but [11:26] soft costs or project costs in other [11:28] words. Um which are things like um all [11:30] FFN items. So furniture, fixtures and [11:33] equipment. Um this will include [11:35] architecture and engineering fees, um [11:37] permitting fees, um utilities estimates, [11:41] things like that, so that you get a real [11:42] round um idea of what the project [11:45] entails. Um and then we pull all that [11:48] information together into a draft report [11:50] which um is complete and awaiting [11:52] comment which will then get finalized um [11:54] and be ready for consumption. [11:58] Uh [11:59] this this slide here uh is just a a [12:02] again a high level understanding of what [12:04] we're talking about when we are [12:06] discussing needs assessment and [12:07] diagramming. Um we go through uh what we [12:10] call typical room diagrams and these are [12:13] all typical spaces of a fire station of [12:15] a modern fire station. Um and we'll go [12:18] through and ask you questions about what [12:20] you have now, what you think you might [12:21] need in the future. Um what is the [12:23] clearance required for that piece of [12:24] equipment? um you know, does this meet [12:27] your needs? And then we just go room by [12:29] room and and talk about every single [12:31] thing you could possibly imagine on the [12:33] wall on the floor. Um and so these uh [12:36] these images are sort of the the [12:38] starting point for how we start to [12:39] diagram because these will translate [12:42] directly into a box or a block which [12:45] then is used for conceptual diagramming. [12:49] All right, Sarah Partap from Mang [12:51] Analysis. Um that was sort of our [12:53] overview portion of like what we were [12:55] doing and how we did it. So now we're [12:56] going to get into uh common things that [12:59] we saw across all the facilities. Uh and [13:01] then we'll go station by station and [13:02] kind of give the high level uh portions [13:04] of that. So uh for the facility [13:07] condition assessment [13:08] um the one of the primary things we saw [13:11] was uh issues with pavement. You know [13:13] there's the freeze thaw cycle here. [13:15] There's heavy weight equipment going [13:16] over them. So the pavement gets torn up, [13:19] beaten up much more than other typical [13:20] areas. and you know those can worsen [13:23] over time. So that was consistent. [13:25] There's alligatoring, there's potholes, [13:26] things like that occurring uh at pretty [13:28] much all the stations to various [13:31] degree. Um another common one that we [13:34] saw was the stations, although you know [13:36] people live there, it is like their home [13:37] while they're on duty. Um so but they're [13:39] residential grade finishes in the [13:41] kitchens and although it's a residence [13:42] kind of um it gets a lot harder use than [13:45] a typical residential. So it's um with [13:47] residential grade finishes they just [13:49] corrode over time. they get beaten up [13:51] more than they would in a typical house. [13:53] So, um you know, upgrading to commercial [13:56] grade finishes though will last a lot [13:58] longer. Um ADA accessibility is a [14:02] challenge at every station. Uh Sarah [14:03] Gladics, we'll get into that a little [14:05] bit more detail later, but from, you [14:07] know, the the right of way getting into [14:08] the building to navigating within the [14:10] building, uh you know, compliant door [14:13] handles and door hardware, heights of [14:14] drinking fountains, it just there's a [14:16] lot of ADA um issues throughout all the [14:18] stations. [14:20] security. There's minimal security at [14:22] most of the stations. You know, there [14:23] are some secured doors. Um, but you [14:26] know, most stations may may lack [14:27] separation between public and private [14:29] spaces. Um, parking is limited and [14:33] there's just general security [14:36] challenges. And then one of the largest [14:38] ones was mechanical controls. So, [14:40] there's the mechanical actual systems [14:43] and the pieces of equipment like the [14:44] chillers and the air handling units. And [14:45] then there's the mechanical controls [14:46] that program them all and tell them when [14:48] to do what correctly. There's problems [14:50] with both, but the mechanical controls [14:53] were consistently um needing a lot of uh [14:57] they're they're out of date. Some of [14:58] them are not they're not ne network [15:00] control, so they can't be controlled [15:01] from a single location. You have to go [15:02] to each station and kind of try and fix [15:04] it. So there's a lot of uh problems with [15:07] mechanical controls. [15:09] Um and then probably the most [15:12] significant from the FCA is the lack of [15:14] dedicated maintenance staff. So we know [15:17] that NFR right now the firefighters and [15:19] the employees are the ones who are [15:20] responsible for doing a lot of the [15:22] day-to-day troubleshooting kind of [15:24] maintenance and then the rest is [15:25] performed by contractors you know [15:27] maintenance contractors which one can a [15:30] lot more expensive and two you know have [15:32] varying quality of work. Some are great [15:33] and some sort of just you know check the [15:35] box and don't do the best work. So, um, [15:38] there's a lot of issues that because [15:40] they don't get handled when they're [15:41] small, they escalate to be much larger [15:43] and much more expensive. [15:47] Sarah Gladex from Rice Fergus Miller. um [15:50] a handful of items that we found from a [15:52] planning standpoint um again lack of ADA [15:56] compliance um throughout um lack of [15:59] consistency in sort of modern or typical [16:02] fire station spaces like bunker gear [16:04] rooms um decontamination spaces um [16:07] lacking some industry best practices [16:09] what we see for modern fire stations um [16:11] and then lacking some space for both [16:14] current and new technology and [16:16] firefighter specialty equipment um and [16:18] then inadequacies in your fire training [16:20] uh facility and [16:22] grounds. So ADA compliance um you can [16:26] see just for example um getting to a [16:28] basement uh only via stairs would [16:30] provide no accessibility. Um a fire [16:33] station is a public facility. Therefore [16:35] it is required to um be held to the [16:38] international business international [16:41] sorry IBC I'll just call it IBC. um uh [16:45] it is required to meet the intent of the [16:47] code as far as a public facility um [16:49] using public dollars. And so there is no [16:52] real workaround for compliance with ADA, [16:55] but we do our best to make sure that [16:56] it's um that it makes the most sense for [16:59] the function and the use of the [17:02] occupants. Um but you still need to be [17:04] able to get into a building or get to a [17:06] second level or a basement, for example. [17:08] And that is something that's lacking [17:10] kind of throughout the portfolio. [17:12] um inconsistent Yep. Inconsistencies [17:15] with some of these spaces like bunker [17:17] gear rooms and decontamination rooms um [17:20] is really important because uh we [17:22] understand that uh decontamination helps [17:25] prevent um bloodborne pathogens from um [17:28] spreading throughout your station. It [17:30] keeps your crews healthy. Um, and that [17:32] decontamination space is where you need [17:34] to be able to wash all of your gear. Um, [17:37] handle specialty equipment. And, uh, [17:39] bunker gear needs to be stored [17:41] specifically. Um, and it it becomes [17:44] degraded with UV light over time. Um, [17:46] and it also has harmful chemicals that [17:49] are integral to the actual fabric of the [17:52] bunker gear. Um, and they should be [17:53] separated after they've been used and [17:55] cleaned and put into a room with a [17:57] closed door. Um, so things like that, [17:59] not storing them in in anywhere that's [18:01] getting direct light and also not [18:03] storing them um in the tub room, which [18:06] is then getting diesel exhaust um into [18:09] your [18:11] gear. Um, industry best practices, kind [18:14] of a a catchall for a lot of things that [18:16] we're seeing um trends within the [18:19] industry. Uh, gender equity and [18:21] neutrality, um, such as having [18:23] individual sleep rooms, uh, which you do [18:26] well in. Um I think all but station five [18:29] have individual sleep rooms which is [18:30] excellent. Um and then also having [18:32] single occupant restrooms with shower. [18:35] Um it just gives a little bit more [18:36] autonomy to the firefighter um when [18:39] they're on shift and some privacy both [18:41] acoustic visual um uh and also [18:44] individual temperature controls. Um so [18:46] that's something that we pretty much [18:49] across the board are always doing in a [18:51] new fire station. That way each occupant [18:53] of of the space, especially during [18:55] sleeping hours, um can control if they [18:58] want it warmer or cooler, they want [19:00] natural light, they want um artificial [19:03] light. So blackout blinds and and sleep [19:05] room controls um are very important. Uh [19:08] non-porous surfaces again for bacteria, [19:12] um bloodborne pathogens, um things like [19:14] that being able to be easily cleaned and [19:17] maintained. Um use of the tub room. Um, [19:20] tub rooms should not be used for [19:22] gathering um or meeting of any kind. Um, [19:25] they should be used for a working space [19:28] and should not have couches or chairs or [19:30] tables for kind of congregating. Um, and [19:33] so we do see that um, across some of the [19:36] stations and I know it's a cultural [19:37] thing. Um, but we will uh, we will raise [19:40] awareness to um, the dangers um, of [19:43] being in that space for longer than [19:45] needed. Um, and then staff parking. Um [19:48] again as Sarah mentioned um site [19:50] security and site parking u we really [19:53] need to have adequate parking for shift [19:54] change. So the number on shift times two [19:58] would be how much parking you would want [20:00] to have at every station. Um which could [20:02] be a challenge at certain stations but [20:04] it's definitely something to [20:07] consider. Um and then uh space which can [20:11] be uh well if it's decontamination space [20:15] you know extractors we see um you know [20:17] in the tub room or kind of out in the [20:19] open you know we really want to get [20:21] space dedicated for um some of the [20:23] specialty equipment um that will help [20:26] keep your gear maintained um keep folks [20:28] clean the station um you know there's [20:31] new technologies that are coming out and [20:34] um you know we need to be able to think [20:36] and futureproof for some of that [20:37] equipment that may be coming or that [20:39] already has come but there's no room to [20:41] implement into the [20:44] facilities. And then just generally uh [20:47] your fire training or drill grounds um [20:49] have limited limited site availability [20:52] um deteriorating deteriorating [20:55] infrastructure. Um it's been the tower's [20:58] been burned uh many times and um needs [21:01] to be replaced. Um and then there's just [21:03] lacking of of uh of training um [21:06] objectives to meet the needs of the [21:08] city. [21:11] All right. So that was oh sorry Sarah [21:13] Partap from Mang Analysis. Um that was [21:15] our uh kind of overview of the common [21:18] trends throughout all the stations. So [21:19] now we're going to dive a little deeper [21:21] into individual stations and facilities [21:23] and their uh specific needs. So we'll [21:26] just go in order starting with uh fire [21:28] station one which is Amherst Street. Um [21:31] the way we'll do this is I'll just cover [21:33] quickly some of the top FCA related [21:35] issues. So you know actual issues with [21:37] the building besides the programmatic [21:39] issues and then Sarah Gladex will talk [21:41] through the programmatic ones. So [21:43] Amherst Street Station that was that [21:45] staircase photo I believe that Sarah [21:47] showed on her ADA slide. Um that station [21:50] one of the primary issues is moisture [21:51] intrusion. The photo I'm showing here is [21:53] just a example of the downspout not [21:56] being directly connected to the [21:57] groundwater drainage system and it's [21:59] right over a crack. So there's obviously [22:01] there's moisture intrusion that's coming [22:03] down into the basement um which causes [22:05] erosion and can cause mildew and things [22:07] like that. Because this is your oldest [22:09] station, it has a lot of hazardous [22:11] materials. It predates all the laws that [22:14] say what you can and can't put in a [22:15] facility like this. So you know there is [22:17] uh asbestous, there's lead paint, uh [22:20] there's several noted hazardous [22:22] materials there. Um and then the third [22:24] big issue I wanted to highlight was just [22:26] end of life HVAC equipment. So in this [22:28] case it's equipment and controls I [22:30] believe. Um but just you know boilers [22:32] and things like that they might last if [22:33] you upkeep them well 20 years and then [22:36] they just need to be replaced. So these [22:37] are at end of [22:39] life. Um and as far as programmatic um [22:43] deficiencies. There's not a dedicated [22:46] decontamination room. There's not [22:47] dedicated bunker gear storage that isn't [22:49] in the tub room on the walls. Um there [22:51] is not sufficient office space which [22:54] would include um a firefighter work [22:56] area. So kind of afteraction reviews or [22:59] debriefs um report writing things like [23:01] that. Um we're lacking space for those. [23:04] Um and then lack of private single [23:06] occupant restrooms. [23:09] Sarah partap again. So station two Lake [23:12] Street station. Um this one an [23:15] interesting problem. The way the roof is [23:17] configured is when ice and snow melt it [23:19] kind of all converges in a single point [23:21] which happens to be right over the [23:22] entry. So, if there's large snow or ice [23:25] melt, it can, you know, obviously get [23:26] moisture on people that are coming in, [23:28] but the ice could actually fall uh, you [23:29] know, onto somebody who is coming [23:31] through that door. Uh, there's floor [23:33] corrosion um from I believe that [23:35] probably the hydronulic piping and the [23:37] flooring. And then again, HVAC, the [23:39] problem with this one is the boilers [23:41] themselves are at end of life and have [23:43] been failing and have had uh fixes and [23:45] patches and things like that, but [23:46] they're needing to be replaced now. [23:49] um programmatically um site parking is [23:53] is an issue there. Uh we know there's a [23:55] through road that goes uh right through [23:57] the parking area um for staff and public [24:00] parking. Um and so that needs to be [24:02] addressed. Um there's no dedicated [24:04] kitchen space for the admin since it is [24:07] now headquarters. So level one um off of [24:10] the public parking is is where uh [24:13] firefighter administration is um [24:16] currently located and they don't have [24:18] the proper um accessory spaces for that [24:22] use. Um it is a a relatively new station [24:25] by the by fire station standards. Um and [24:27] so it's been wellmaintained. There's [24:29] there's a lot of good happening. So, we [24:31] only really recommend um converting some [24:35] sleep room or I'm sorry, converting some [24:37] uh space in the living quarters at the [24:38] fire station side um for single occupant [24:42] restrooms and the rest is is in pretty [24:44] good [24:46] shape. Okay. Station three, which is [24:48] Fitbook Road. Um this is actually the [24:51] pilot facility that we did. So, our [24:52] first station that we assessed um end of [24:55] life roof uh the roof the the roofs are [24:58] a problem throughout all the stations. [25:00] Uh but this one in particular, this one [25:03] is additionally challenging because just [25:04] accessing the roof, you have to go out [25:06] through a window. There's not uh [25:08] built-in, you know, roof hatches. So, [25:09] it's not easy to access. And when a roof [25:12] is not easy to access, it means that [25:13] you're not maintaining it as frequently. [25:15] So, your roof drains can get clogged [25:17] with tree debris, then water ponds on [25:19] the roof, and then you develop a roof [25:20] leak over time. So, having convenient [25:22] and safe roof access is an important [25:24] thing to consider in any fire station, [25:26] any building really. Um and then the [25:28] boiler and heat pumps at this one are [25:30] also nearing end of life. [25:33] Um from our perspective, this also um [25:36] has a parking challenge and that's [25:38] something we addressed in the planning. [25:40] Um there's just not enough parking [25:41] spaces um especially for shift change. [25:44] Um and then this uh this station [25:47] actually they had an addition. So, a new [25:49] uh tub room was put in not that long ago [25:52] um which enabled them to uh include a [25:54] secondary bunker gear storage room. And [25:57] so, they've got two instead of one [25:59] larger single room. Um and this is a [26:02] station in particular where uh folks are [26:04] gathering in the tub room and that space [26:07] could be uh very well utilized for a a [26:11] dedicated decontamination room um as the [26:14] extractor just sits in the tub room um [26:16] out in the open. So, um there's some [26:19] there's some great things at that [26:20] station and there are a few challenges [26:22] that could be fairly um easily solved. [26:27] All right. Uh next is station 4, Crown [26:30] Hill Station. Um this one is the newest [26:32] in the portfolio. I believe it's from [26:34] 2006 or thereabouts. 2008. Thank you, [26:37] Sarah. Um and this one, of all the [26:40] stations, we think this one probably has [26:42] the worst HVAC issues even though it's [26:44] the newest. The picture you're seeing [26:45] here is of the hydronic heating system. [26:47] And I'm not a mechanical engineer, so [26:49] don't ask me detailed questions about [26:50] this, but essentially, you know, it's a [26:52] hot water piping system that goes [26:54] throughout the building and that's [26:55] what's used to heat the building. And [26:57] the water in that system should be clear [26:59] water. That water is obviously not [27:01] clear. It's got oil in it. Um there's a [27:03] lot of, you know, uh pin prick leaks [27:05] that are starting to happen within the [27:07] system. And we're guessing that probably [27:09] the system wasn't um completely flushed [27:12] during the construction time. You know, [27:13] once they install it, there should be a [27:15] full flush. And if that didn't occur, it [27:17] can lead to problems over time. The [27:19] water quality issues will corrode the [27:20] pipes leading to those small little [27:22] leaks. Uh so that's what you're seeing [27:24] there. [27:28] Yes. Uh since it is a newer station, [27:30] there's a lot that is working really [27:32] well. Um, I would say the biggest [27:35] challenge is that it was formerly where [27:38] headquarters was before it went to [27:39] station two. And so there is a lot of [27:42] unused uh sort of public andor um [27:45] administrative spaces in the front of [27:47] the station. Um and so being able to [27:49] better utilize that um and get the fire [27:52] marshals some additional space as well [27:54] as maybe a true reception and [27:56] administrative office space um and some [27:59] storage uh will help that um help solve [28:02] those problems. Um and then there isn't [28:04] really what we would consider a true [28:06] decontamination room. It's sort of [28:08] utility catchall space um that happens [28:11] to have some decontamination in it. So, [28:13] there's a few minor things that can be [28:15] um updated from a programmatic [28:16] standpoint. [28:20] All right, station five, Pineh Hill Road [28:22] Station is the next one. Uh this one [28:24] overall the building, I think everybody [28:26] knows the building of this one is [28:27] essentially at end of life, but just [28:29] some issues that will highlight [28:30] hazardous materials. Um again, this is [28:32] one that has a fair amount of hazardous [28:34] materials. The photo you're seeing [28:35] there, uh the black squares on the floor [28:37] are where um tiles have become loose. [28:41] And so that's the actual the black [28:42] adhesive that you're seeing, which is an [28:44] asbestous containing material. And [28:46] asbestous when it's not touched and it's [28:48] intact, it's it's okay. You don't still [28:51] don't want it, but it's not going to do [28:52] any harm. But when it becomes uh [28:54] airborne and fryable from, you know, [28:55] people walking over it and picking up [28:56] particles, as you can assume that's [28:59] happening here because it's the floor, [29:00] that is not good. Um, this station also [29:03] has pretty poor ventilation. I believe [29:05] the upstairs there's no cooling. It's [29:07] just windows. So, uh, and a lot of their [29:09] ventilation comes through operable [29:10] windows instead of, you know, [29:11] mechanical, uh, systems doing it. And [29:14] the roof, another one, this is another [29:16] one with the end of life roof. [29:19] Um, this one, um, as you can see by my [29:21] little paragraph there, it is deficient [29:24] in almost all programmatic elements that [29:27] would make a a functioning and healthy [29:29] fire station. Um not I mean that's just [29:33] beyond the hazmat issue that we have but [29:36] you know fitness is happening in the tub [29:38] room where it you know that is a dirty [29:41] space um and so you shouldn't be working [29:43] out in there um no dedicated um anything [29:46] as far as operational um decontamination [29:49] room bunker gear storage um and then [29:51] sleeping quarters. Uh it is the only uh [29:54] facility that does not have individual [29:55] sleep rooms and restrooms. Um, and so it [29:58] it's uh it doesn't provide any privacy [30:01] of any kind for any of the crews to have [30:04] um adequate and healthy [30:08] sleep. So what we did was discuss um [30:12] during the needs assessment and [30:13] workshops, what would a new station 5 on [30:16] Pineh Hill Road look like? Um is it [30:18] feasible to remodel what you have? Sure. [30:22] But let's think bigger and let's think [30:24] into the future. what does the city need [30:26] and what does the fire department need? [30:27] And that's where we've landed is uh is [30:30] enabling a new station to be to be [30:33] discussed and planned um that also [30:36] houses a citywide EOC and emergency [30:38] management which is a really excellent [30:41] use of a public facility to put in um to [30:44] put in several entities. Um and you've [30:47] got the room for it. Um, and you can do [30:50] it single story, which was fun to figure [30:53] out because all of your stations are uh [30:56] more than one story currently. Um, so it [30:59] was a really it was a great exercise to [31:00] find out, you know, how many sleep rooms [31:02] will you need? Um, you know, what other [31:05] uh accessory spaces would you need to, [31:08] you know, to handle more recruitment and [31:10] retention and what can you provide your [31:12] current firefighters on staff? um as [31:15] well as um who do you want to bring in [31:17] in the future and how do we make that [31:18] happen? So just understanding the goals [31:21] um understanding the needs um and this [31:24] is where we have come conceptually. [31:26] Sorry, you're good. [31:29] Okay, next uh station six Conan Road. Uh [31:32] this one again it has an end of life [31:34] roof and it's hard to get on the roof. [31:36] Um not great ventilation. This is kind [31:38] of funny. We were our mechanical guy was [31:40] out there and he was talking to one of [31:42] the firefighters who's like, "Oh no, we [31:43] have a ventilation. we have a ceiling [31:44] fan. We're like, well, I mean, yeah, [31:46] that moves the air around, but you know, [31:48] actual exhausting ventilation to get [31:49] clean outside air into the building. Uh, [31:52] the cooling unit there is undersized. [31:54] Um, so it can't really perform for the [31:56] full cooling load that's needed at this [31:58] building. And then this one is unique [32:00] because it it has the fire station and [32:02] it also has the mechanics area, the [32:04] shop. And uh the heating system is [32:07] connected. So there's like a single [32:08] control for the fire station half and [32:10] the shop half, which the shop half, they [32:12] might have more doors open. they might [32:13] have they have different needs than the [32:15] building that's sort of left alone. So, [32:17] um decoupling those heating and cooling [32:19] systems would be a priority. [32:22] Um, this station uh also I I believe [32:24] it's had several kitchen remodels um all [32:27] of which are residential grade and you [32:29] know the the use and abuse of [32:31] firefighters in kitchens and uh [32:35] materials finishes um is understood and [32:38] um I think that's that would be a [32:40] priority is getting in some commercial [32:42] grade um uh appliances. Um there is no [32:46] real lobby or or obvious entrance which [32:50] I think from a public standpoint is you [32:52] know you want to make sure someone knows [32:53] where they're going to go if they were [32:55] going to have an emergency or they [32:56] needed to stop by um also for security [32:59] purposes. So that's something that we [33:01] looked into when when uh talking about [33:03] needs um and assessing what that program [33:05] might look like. Um decontamination and [33:09] bunker gear they kind of they're a [33:11] little muddy there. Um, I think that we [33:13] need some true spaces, some true [33:15] separation. Um, and, uh, maintenance [33:18] bays, uh, certainly need better storage. [33:21] Um, both interior storage and exterior [33:24] storage. Um, and they're woefully [33:26] lacking in their, uh, very small living [33:28] quarters and office [33:32] space. All right. The fire alarm [33:34] building. Uh this one I believe it has a [33:37] heated uh floor, you know, through [33:38] piping embedded in the floor, which is [33:40] hard to replace because it's embedded in [33:42] the floor, but uh there's issues with [33:44] that. So that's going to require some [33:45] repairs. The roof is at end of life. [33:47] Again, mechanical controls, and this one [33:49] houses a data center, you know, which [33:51] generates a lot of heat, so there should [33:53] be a dedicated cooling system in the [33:54] data center just to keep it from [33:56] overheating and failing. [33:59] Um, a couple uh fairly major items at [34:02] this uh facility is ADA compliance. [34:05] Again, I mean, we've we said that on [34:07] both uh phase one and phase two, ADA [34:09] compliance is an issue. Um, this one in [34:11] particular, um, and I say it very [34:14] gently, um, but, uh, this is not a a [34:19] station. This is not for firefighters. [34:21] Um, this is for fire alarm and [34:22] dispatches located there. Um, and you [34:25] could certainly have a dispatcher who [34:28] has mobility issues and there is no way [34:30] currently to get a person up and into [34:33] the dispatch room. Um, so that is an [34:36] issue that that needs some kind of [34:38] resolution. Um, and that's important [34:41] because you want to make sure that um, [34:43] you're able to have folks, you know, who [34:45] are wheelchair bound or any otherwise [34:47] have mobility issues um, able to enter [34:49] and or work in the space. um generally [34:52] just inadequate office space for the [34:54] staff members that are are working out [34:56] of there. Um and there is no real [34:59] ability to expand um that facility [35:02] because of the small site that is [35:03] already too small and there's already [35:05] not enough parking. Um so it's it's a [35:08] tough one. It'd have to be a very light [35:10] touch remodel um in order to not trigger [35:13] um major code compliance upgrades. [35:18] Okay. Then our final one is the drill [35:20] yard. So, some of the condition issues, [35:23] um, I mean, obviously the building is a [35:24] burned building, so we did write some of [35:26] that up, but we're not going to talk [35:28] about that because that is the intent. [35:29] It's supposed to be beaten up and [35:30] burned. But the site itself had some [35:32] issues. Uh, one, the type of pavement [35:34] that's out there is not strong enough [35:36] um, for, you know, the apparatus that [35:37] are going back and forth on it. So, it [35:39] is uh, corroding faster. And then, uh, [35:43] the drainage is not great. So in the [35:44] winter, you can see there, this is the [35:46] summer, there's a puddle there where [35:47] they're, you know, releasing many, many, [35:49] many gallons of water and then it [35:51] becomes icy and it's dangerous to drive. [35:53] Um, additionally, there's no permanent, [35:55] uh, like training building out there, so [35:57] no restrooms or showers, so they don't [35:59] have an opportunity to clean up before [36:01] they get back in the truck and go back [36:02] to their station. [36:04] Um and at this current site, not [36:06] currently where the um ConX uh tower is [36:09] located, but uh elsewhere at the [36:11] landfill, um there's an opportunity for [36:14] potentially about four acres of [36:15] development for a new training and drill [36:18] grounds. Um so we use that footprint to [36:21] um to discuss mostly with Chief Pulot [36:24] and Captain Nielsen uh with training to [36:27] find out what, you know, what are the [36:28] what are the objectives for training? [36:30] what does the city of NSHA need as far [36:32] as different types of response? Um, you [36:36] know, what are the props that you might [36:38] want? And so, uh, we went really in [36:40] depth with the training program and [36:42] ended up, well, a train training site is [36:44] always going to be very large and very [36:47] expensive. Um so thinking about it from [36:49] a phased approach, uh we felt confident [36:51] that um you could get a lot of the um [36:54] the infrastructure put into place and [36:56] some facilities on the site in phase one [36:59] and then down the road as more funding [37:01] becomes available, you could really [37:03] outfit it with all the different props [37:05] and uh urban search and rescue, confined [37:07] space, training options, um hazmat. But [37:11] for phase one, um it would really focus [37:13] on what you need. Now, um an outdoor [37:16] classroom, a covered area with restrooms [37:18] so you can train outdoors during all [37:21] kinds of weather. Um relocating the [37:23] existing ConX uh burn tower to that [37:26] site. Um using the site topography in [37:29] order to do some wildland um potential [37:32] wildland training. Um so just that was a [37:36] fun one. There's a lot of really fun [37:37] stuff you can do with the training site. [37:39] Um, and I think it would be very [37:41] beneficial to not only the city and the [37:44] fire department, but the region. [37:48] Okay, so that was sort of the end of um [37:50] the station bystation analysis and now [37:54] more getting into the planning portion [37:57] of the evening. Um, yeah, just a couple [37:59] of things. Uh we discussed um in one of [38:02] our first uh initial meetings or [38:04] workshops um what does the future of [38:07] Nashua look like and what does that do [38:09] for response times um and are there [38:13] developments coming right now or coming [38:15] in the future where you're going to need [38:16] to expand the service area or is your [38:19] you know the response times are going to [38:20] get a little too long from your current [38:22] stations. Um, so what we did was just [38:25] come up with, you know, what would like [38:26] a satellite station be or or a smaller [38:29] um smaller station that could go, you [38:31] know, maybe nearby a new school or or [38:33] other new developments in the city, [38:35] maybe on the outskirts that don't have [38:38] the greatest response times. So, we just [38:40] came up with a prototype that would meet [38:42] those needs um and then be easily [38:44] adaptable at any time in the future um [38:48] if if chosen. [38:53] And we also did the same kind of [38:54] exercise um with fire alarm um [38:57] discussing those needs again and [38:58] diagramming you know what is the space [39:00] required um what are you missing right [39:03] now in your current facility um you can [39:06] ignore uh this the site image on the [39:09] right but we just what we do is we use [39:11] that as a test to fit and we we figure [39:14] out you know how much acreage might you [39:16] need in order to accommodate the size of [39:18] the facility and the um associ [39:20] associated parking requirements. Um, so [39:23] we went in depth with Fire Alarm and and [39:26] the folks there and and got their [39:27] feedback to figure out what does the [39:29] future fire alarm facility need to look [39:31] like. [39:36] All right. So, now getting a little bit [39:38] into some of the costs for some of these [39:40] pieces. Uh, Sarah Gladex will cover most [39:43] of this, but we wanted to call out a few [39:44] things uh up front. One is about the [39:46] level of detail of the cost estimates [39:48] that we're providing. So, From the [39:50] facility condition assessment, there is [39:52] a lot of those short-term and long-term [39:54] deficiency costs, the predicted renewal [39:56] costs. These are rough estimates sort of [39:59] to plan your budget. So, rough order of [40:01] magnitude. Is it a $10,000 project or is [40:03] a $100,000 project, but we're not giving [40:05] you is it a $10,000 versus a [40:07] $12,60 project. So, it's really kind of [40:10] um planning purposes, not a full [40:14] estimate. And [40:16] um an important thing we've mentioned [40:19] kind of throughout is extensive repairs [40:21] can trigger code compliance upgrade. So [40:24] with the facility condition assessment, [40:26] if by some way you were able to fund all [40:29] of the deficiencies in a single station, [40:30] like we're going to make all the repairs [40:32] they suggested over the next 5 years, [40:33] it's likely going to be a significant [40:35] enough of an investment that it would [40:37] trigger a full code compliance upgrade, [40:39] which would bring in, you know, hazmat [40:40] remediation, ADA compliance. It would [40:42] bring in a lot. So the the costs can [40:45] grow quite quickly if you're required to [40:47] do a full compliance upgrade. Um and [40:50] then getting into the LRFP, sorry, the [40:52] long range facility plan costs, those [40:54] are more they're taking our costs from [40:56] the FCA and rolling those into a larger [40:58] project cost. So the facility condition [41:00] assessment costs are sort of a the intro [41:03] level budget planning and then the um [41:06] the long range costs will include like [41:08] Sarah said soft costs like your internal [41:10] costs of doing business, the design [41:12] fees, permitting fees. They try to make [41:14] their best guess at all in what are [41:15] these things going to cost. [41:19] Um some additional considerations on [41:21] cost uh timing and escalation. If you [41:24] know anything about the construction [41:25] industry, you know that escalation and [41:28] the economy are really big factors in um [41:32] and the cost of materials and goods um [41:34] and the cost of construction and timing [41:37] um is really important because when [41:38] you're adding in 4 and a.5% escalation, [41:41] which could change, it could be higher, [41:43] it could be lower. Um that's just going [41:46] to make it it's always going to be more [41:48] expensive if you do it later. um not [41:50] because anything changes but because [41:52] escalation will change and the costs of [41:54] things uh increase over time. Um and [41:57] it's also good to understand the timing [41:59] of a project. For example, a new fire [42:02] station um on average is going to take [42:04] about a year to design and get through [42:06] permitting. Um and it's going to take [42:08] about a year to 18 months to build. [42:10] That's fairly typical. Um can be [42:13] slightly different depending on the size [42:15] of and the scale of the facility or any [42:17] complexities. Um, also customary uh 10% [42:22] uh estimating and design contingency. [42:24] Um, that contingency goes down as you [42:27] have more knowns. So when you're early [42:29] on in, you know, schematic design, for [42:31] example, you're going to have a higher [42:32] contingency and then as you get towards [42:34] construction documents um, and well into [42:36] your bid sets, your contingency is going [42:39] to continue to go down uh because more [42:41] things have been figured out. Um and [42:44] then in the case of today um we we have [42:47] added uh quite a bit of additional [42:49] contingency to these projects just to [42:51] capture any unknowns. Um you know you [42:54] want to go in and ask for as much money [42:56] as you think that it may cost plus some [42:59] so that you're not going back out and [43:00] and oh we forgot this or we didn't [43:03] account for that. So we try to be really [43:05] conservative with our estimating to make [43:08] sure that you are covered. Can I chime [43:12] in right here? Yes. Yes. So, uh, I'm [43:14] gonna just naturize this a little bit [43:19] because I I I get very sensitive at this [43:22] as the typically the person who's up [43:24] before you that has to explain the [43:26] various project costs. Um, you know, I I [43:29] tend to want to make sure we're very [43:30] clear on this. So, the 4.5 escalation, I [43:33] think that's low. I would I would carry [43:35] more something like 10% for [43:36] year-over-year escalation just by the [43:38] New England market being the way it is. [43:40] Um, and that's what we currently carry, [43:42] just so everyone knows, four projects to [43:44] to to be safe. Uh, relative to the [43:48] estimating design contingency, we [43:50] typically carry 15%. And I want to be [43:52] clear, this contingency is reduced as a [43:54] design contingency, but we have two [43:56] other contingencies that we always carry [43:58] as well, an odin contingency and a [44:00] general contractor's contingency. Those [44:02] contingencies are on top of this [44:04] contingency. So, I just want to make [44:06] sure that that's that's kind of [44:07] understood. And then we're carrying [44:09] anywhere between 1 and 5% for tariffs [44:12] and and various, you know, inflationary [44:15] factors right now on our on our projects [44:17] based on what we're hearing and seeing [44:20] in the marketplace. Uh and that's [44:22] obviously evolving. [44:24] Thank you. Y that's great. [44:28] Um a few other things to consider [44:30] related to cost um are uh delivery [44:33] methods. So a traditional design bid [44:35] build delivery method is usually the [44:37] cheapest um which means all of your [44:39] documentation is done and then you go [44:41] out and hard bid it on the street and [44:42] you take the lowest um what do they call [44:46] it the lowest responsible bidder um and [44:49] then you can also do alternative [44:50] delivery methods which which are [44:52] becoming a lot more popular um things [44:54] like CMGC uh construction manager [44:56] general contractor um or design build or [44:59] progressive design build um they're all [45:01] very great methods in their own Okay. [45:03] Um, I would say alternative delivery [45:05] methods can be a little more expensive [45:07] on the front end, but you're bringing in [45:08] your contractor early to help solve any [45:11] design issues with the architect and [45:13] engineers from the beginning. Um, and so [45:16] there are pros and cons, but you can [45:18] anticipate some higher costs with some [45:20] of these different methods. Um, and also [45:23] considerations for an owner's [45:24] representative. Um, a large a small [45:26] project may not need it, but you need [45:28] someone to be able to manage uh the [45:31] work, the project, the contractor, the [45:34] architect. Um, so we like to add in some [45:36] uh contingency or allowance in your soft [45:38] costs for an owner's representative um [45:41] for the project if [45:46] needed. Um, and just an overview um for [45:49] the new stations uh that are part of the [45:52] long range the phase 2 long range plan. [45:54] Um all new facilities are just you know [45:57] one conceptual design option and an [45:59] estimate. Um the training grounds as [46:02] mentioned has a phase one and a phase [46:03] two component. Um and then each remodel [46:06] um based on on the needs assessment the [46:09] remodels that were determined um have [46:12] several different options. Um, just to [46:14] give you uh an overview of what you [46:17] could expect from, you know, more of the [46:19] FCA data that Sarah and her team come up [46:22] with. Um, if you're going to address [46:24] more deficiencies and opportunities, [46:26] it's going to be more expensive. Um, if [46:29] you do all of the planning work that [46:30] phase 2 represents, it's it's going to [46:33] be more expensive. So, we tried to break [46:34] it out so you get a little bit of a [46:36] different um idea of the opportunities. [46:39] So, option A mostly correcting all [46:41] deficiencies. um and and opportunities [46:44] being created. Um and then really the [46:47] biggest component there is full [46:49] planning. So option A is going to have [46:51] everything necessary from the phase one [46:54] uh FCA data, everything from phase two. [46:57] Um and it's also going to take into [46:58] account upgrades needed. Um option B is [47:02] kind of like one tier down. So maybe [47:04] like option A is best and then better is [47:08] option B which would be you know some [47:10] light refresh to the spaces you know [47:13] getting new paint new [47:16] materials you're not getting any new [47:18] programming no new walls but you're [47:20] getting something um and then you're [47:22] also getting the priority items that are [47:25] deficient um based on the FCA um and [47:28] those would be replaced in kind so that [47:30] will help keep the cost down and you [47:32] hopefully can avoid triggering ing a [47:34] full code compliance upgrade. Um and [47:37] then option C is basically just no [47:40] planning. You're not changing anything [47:42] within the station except for when it [47:43] comes to um systems and um [47:46] infrastructure and things that are are [47:48] deficient with the building itself and [47:50] and its uh necessary [47:55] systems. So this is where I start to to [47:59] talk about big millions. Um, and I like [48:02] to say big millions because it all feels [48:04] kind of like it's not real. [48:06] Like fire stations are are very [48:09] expensive. Um, they need to um be held [48:13] to a um a higher structural um [48:16] consideration than other facilities. [48:18] They're also public facilities. Um, and [48:21] those come with hefty price tags. [48:25] Um, these are all conceptual costs and [48:28] they are also um, uh, there is a high [48:32] contingency involved. Um, but we wanted [48:34] to make sure that when we're talking [48:36] about what your needs are, we're [48:38] covering them all and more. Um, and Tim [48:42] may Tim may disagree. I think our we [48:44] have different numbers. Um but uh this [48:47] is just giving you kind of an idea of [48:49] what you can expect when you read [48:51] through um the final draft of uh phase 2 [48:55] uh report. Um and so we're going through [48:57] and we're we're indicating um visually [49:00] what the hard construction costs are, [49:02] what the soft project costs uh could be, [49:05] and then what that total looks like. Um [49:08] so if you were going to say we're going [49:09] to do all of these new facilities, it's [49:12] probably about $und00 million give or [49:14] take. It's probably less, but again, [49:17] being very conservative, we're going to [49:19] estimate a little higher um because it's [49:22] safer in this [49:25] economy. And then again, just another [49:27] visual of of what you can expect in the [49:29] report is um going through station by [49:32] station for remodels and then indicating [49:34] what those option A, B, and C kind of [49:36] that good, better, best um scenario [49:38] might look like. And so of course it [49:40] varies because you could pick all option [49:42] C and then you're going to be on the [49:44] lower end or you could pick all option A [49:45] or you can do a mix. So there's kind of [49:47] a range there um of what you're looking [49:52] at. Uh and this is just showing um kind [49:56] of some uh behind the scenes like when [49:58] we're going through and we're indicating [50:00] um you know what projects could look [50:03] like. It could be a remodel. It could be [50:06] um a new station. And in this case, [50:08] we're just giving um examples of what it [50:11] would look like to do uh re- roof and [50:13] HVAC projects on all of the existing [50:15] facilities. Um so that's also an option [50:18] is to kind of pick and choose and and [50:19] select projects uh based on priority for [50:22] the fire department and for the city. [50:28] Uh so now getting into recommendations [50:30] in the short term. You guys I believe [50:32] have probably already heard some of this [50:34] information. Um but you know sort of [50:36] decided the department has identified a [50:38] few priorities. The first one is again [50:40] working through all those HVAC issues [50:42] with equipment and controls uh across [50:44] the department. Uh repairing or [50:47] replacing as many roofs as possible [50:49] across the department. And then uh the [50:51] new Pinehill uh road station, station [50:54] five, which the feasibility study for [50:56] that is beginning soon. Um those are the [50:59] kind of the the identified priorities. [51:02] And then getting into the the next [51:04] steps, we're essentially done with our [51:06] work for this project. It's more just [51:08] kind of finalizing any comments, [51:10] answering questions from you guys. But [51:12] um uh the facility condition assessment [51:15] report is complete, just unless there's [51:17] any final comments or edits. the long [51:19] range plan is similarly complete just if [51:21] there's any final comments or edits. So [51:22] both of those deliverables would be [51:23] formalized uh as the final version. Um [51:27] and then just you know being here [51:30] ongoing to answer questions as you kind [51:32] of get into it and then obviously the [51:34] feasibility study for the Pine Hill Road [51:36] Station is going to be beginning [51:39] soon. So [51:41] that was kind of the end of what we [51:43] wanted to tell you and we're happy to [51:46] answer questions. Yes. All right. Well, [51:48] I'll recognize Alderman Clay. [51:51] Thank you. I I don't think that it's [51:55] anything that we weren't surprised to [51:58] hear. I think um um Chief Buckston and [52:03] previous chiefs have been kind of [52:04] telling us that this has been been [52:07] happening and uh something we need to uh [52:10] um address and have needed to address [52:13] for a long time. Um, and those the the [52:17] things that you told us at the end [52:18] obviously are something we need to to [52:20] look at first and make our our priority [52:23] and so on. But something that you kept [52:25] talking about, you kept talking about [52:27] parking and and so on. How would you [52:29] address something like parking in a [52:31] place [52:32] that there's only so much right land. So [52:36] how how would you address something? [52:39] That's a great question. I mean you you [52:41] you're kind of landlocked. Yeah. You [52:43] can't exactly like mow down somebody's [52:45] home just so that you have more parking [52:48] spaces. Yeah. In some instances that's [52:50] true. I mean street parking, right? [52:53] Yeah. Amherst Street and Fire alarm. I [52:55] mean, you're kind of just you deal with [52:57] with what you can deal with and and [52:58] that's that. Um but in terms of, you [53:01] know, station two Lake Street station or [53:03] station 3 Spit Brook Road, um there are [53:06] opportunities for additional parking. [53:07] And so in our planning documents which [53:09] are in the final report, you can see [53:12] where you know we're indicating there is [53:14] additional site area that can [53:16] accommodate sometimes it's just a matter [53:18] of a couple of of parking stalls but um [53:21] there are opportunities at several of [53:23] the stations to accommodate more parking [53:25] but yeah there are there are that are [53:28] not just followup. Yeah thank you. So th [53:31] those four items that you talked about [53:33] like the HVAC and so on roofs. So, so [53:36] within that report, do you actually [53:38] break those down um and kind of talk to [53:42] address those particular things rather [53:43] than the entire [53:46] um wish list? I mean, and I I say wish [53:48] list and I don't mean that it's a wish [53:50] list because in in truth, it's it's [53:52] something that's honestly needed and and [53:55] I don't I'm not belittling anything. [53:57] Honestly, I'm not um HVAC is important. [54:00] We talked about it here in city hall. [54:02] You know, we we want the firefighters to [54:04] have something more than I want them to [54:06] have heat. I want them to have [54:07] everything that that they need. I want [54:10] our I want our equipment not to fall [54:12] through the floor. [54:15] You know, I I want our equipment to to [54:17] be housed. I want our, you know, men and [54:19] women to to have the facilities and so [54:22] on. So, I think Sarah Yeah, she can [54:24] address that directly on the screen [54:27] here. Yeah. So, tonight we didn't want [54:28] to get too into the details because I [54:30] could go on for many hours. So we kind [54:32] of just want to give you the overview [54:34] but in the the report that's the facil [54:36] so from the FCA there was two primary [54:38] deliverables there was a an executive [54:39] summary report which presented more of [54:41] the uh departmentwide trends and issues [54:43] that we were seeing and more about the [54:45] methodology and then there's the very [54:46] detailed report uh which goes through [54:49] you know system by system within each [54:50] building and describes what type of roof [54:52] it is what we would score it on a one to [54:55] five scale five being completely failed [54:57] one is excellent and usually within [54:59] warranty period so there's a lot of [55:01] threes um except station five. There's a [55:03] lot of fours and uh and probably some [55:06] fives. Uh and then those individual [55:08] observed efficiencies, each one that [55:09] meets that threshold of we feel it needs [55:12] to be addressed within a 5-year period [55:13] and has a direct cost of at least [55:15] $5,000. Uh those are written up as this [55:18] page I'm showing here uh as just an [55:20] individual deficiency. So, if you wanted [55:22] to go through and like kind of pick and [55:23] choose just individual spot issues, like [55:26] let's just talk about the boiler and the [55:28] controls at this station, you can look [55:29] into that and see a more detailed [55:30] description of the issue and the cost [55:33] related to it. Okay. Did that answer [55:35] your question? Yes, it did. Thank [55:38] Alderman Solomon, thank you. Um, but [55:42] first a comment. Uh, oh my god. Um, [55:47] which part? Kind of the whole thing. I I [55:50] know that, you know, we're looking at [55:52] the [55:53] um that we have a bonding resolution for [55:56] tomorrow night, which I would assume is [55:58] part of this. Yes. Um it's going to [56:00] cross some items off the list. [56:04] Kind of wish we had seen this before we [56:06] started the budget conversation. Um but [56:08] it is what it is. [56:10] If you could, in your professional [56:14] opinion, I'd love to know a letter [56:17] grade across all eight stations and [56:20] facilities that we have. Um, [56:24] just whatever. I mean, you don't have to [56:27] go and, you know, you're a hard grader, [56:28] you're an easy grader. I mean, I don't [56:30] know. I mean, your professional opinion. [56:32] I mean, what do you think the grade of [56:34] our overall NFR facilities are in the [56:37] city of Nashville? It's a solid C. I was [56:38] going to say also a C average. C [56:41] average. Average there, you know. Well, [56:43] C is an average grade. Yeah. So, five, [56:45] you know, station five is particularly [56:47] F. Yeah. Driving. Yes. Um, and then [56:51] other stations like, you know, like I [56:52] highlighted at station uh four, there's [56:56] this significant HVAC issue, but that's [56:57] a new station. So, you know, the way [56:59] it's been planned, the way it's laid [57:00] out, doesn't need a lot of changing. So, [57:02] although some of them will have a major [57:04] issue that needs to be taken care of, [57:06] overall they're still okay. Um we both [57:09] of our firms do a lot of work related to [57:11] fire and emergency services. So we've [57:13] seen a lot of different fire stations uh [57:16] a lot in the Pacific Northwest and they [57:20] have a lot of similar issues and you [57:22] know we also do a lot of work just with [57:24] cities and counties and assessing their [57:26] municipal buildings. Nobody ever has the [57:28] money to fund their buildings. You know, [57:31] it's more fun to like build a new [57:32] building, but a lot of times it's [57:33] forgotten about how much effort and time [57:35] and cost it really takes to maintain a [57:37] building once you have it. It's not like [57:39] maintaining your house. It's a lot more. [57:40] So, it's not an uncommon position to be [57:43] in. Um, even though it is it can seem a [57:45] bit overwhelming. And I I think another [57:47] point, too, is uh the deferred [57:50] maintenance is is probably the the [57:52] number one item just across the board. I [57:55] think that um and I think part of the [57:58] slide of you know no dedicated [57:59] maintenance staff. I mean that is a huge [58:02] hindrance because if you were able to [58:05] to maintain all of these facilities from [58:08] when they were built and then you know [58:10] treat them that way through their their [58:12] life cycle then you'd have different [58:14] stations standing today. Um, some of it [58:17] is as simple as, you know, maybe 15 [58:20] years ago you should have replaced the [58:21] carpet or or maybe it, you know, it's [58:23] like things just start to fail and then [58:25] when you defer maintenance, the overall [58:28] quality of the facility just starts to [58:31] degrade. Um, and Sarah's right. I mean, [58:34] um, the firm that I work for, we've been [58:38] planning and designing fire stations and [58:40] other fire and emergency services [58:41] facilities for 30 years. So, we have [58:44] I've been in a lot of fire stations, a [58:46] lot of them, and you're not unique. It's [58:49] not like when I say a C, you're that's [58:52] bad. It's it's pretty average. And you [58:55] have a lot of older facilities compared [58:57] to, you know, the West Coast where we [58:59] see a lot more uh newer architecture. [59:01] So, see, and those older facilities, [59:04] they do, I mean, they come with a lot of [59:06] constraints relative to parking, but [59:07] just what you can do for ADA compliance, [59:09] you know, we kind of absolutely there's [59:11] minimal things you can do. Um, so in in [59:14] some ways, you know, they're you're [59:16] doing your best, but it's it's not [59:18] always going to work. I'm I'm kind of [59:21] smirking because the fire alarm building [59:24] was Lake Street Station engine ladder, [59:27] too, with the crew of six people. So [59:30] that means 12 people at shift change. We [59:33] got by, you know what I mean? There's [59:36] firemen. If there's a will, there's a [59:38] way. That's why we pay them like that. [59:41] I'm going to right now recognize [59:43] director Cummings. He had some. So, [59:45] Alderman Tivido, you're in the queue [59:47] right immediately after. Thank you. That [59:50] Thank you, Mr. Chairman. Tim Cummings, [59:51] director of administrative services. I [59:52] did just want to note that um a couple [59:55] months back, we've started a [59:57] conversation about um enhancing our our [1:00:00] facilities department. And so I've been [1:00:03] before the budget review committee and [1:00:05] I've been before the personnel and [1:00:07] administrative [1:00:08] uh affairs committee and I anticipate a [1:00:11] continuing conversation with an idea of [1:00:14] us increasing our asset management, our [1:00:17] stewardship of our capital uh buildings. [1:00:21] We need to maintain them in a in a more [1:00:24] strategic way because it will save us [1:00:27] money in the long run. Um, great picture [1:00:30] that was shown at the kickoff of this [1:00:32] presentation was the drains not [1:00:34] connected at the firehouse. Um, you [1:00:36] know, if the goal that I've aspoused is [1:00:39] I'd like to get a maintenance team in [1:00:41] and around uh our our city buildings, [1:00:45] including fire, to to steward those [1:00:48] buildings and the systems the way they [1:00:50] should be because if we can squeak more [1:00:52] life out of our systems, it will it will [1:00:54] save us money in in the long run. And [1:00:56] so, um, I say that because I I I I [1:00:59] recognize the need, um, and I believe [1:01:02] we're working towards a solution. It's [1:01:04] not happening as quickly as I would [1:01:06] like, but, um, I brought this up at a [1:01:08] couple of the, uh, my budget [1:01:10] presentations. Um, more recently at at [1:01:13] uh, my last buildings and grounds, uh, [1:01:15] uh, seeking approval on that [1:01:17] department's budget. But I'm hoping um [1:01:19] you know come FY27 in our next budget, [1:01:23] we will have uh you know a better baked [1:01:26] plan that everyone buys into so we're [1:01:29] we're handling these buildings in a more [1:01:30] efficient [1:01:32] way. Can we go back to that recommended [1:01:35] slide because I just want to just [1:01:37] quickly address a couple of the items [1:01:40] that were raised as priority projects. [1:01:42] So Yep. So, so, um, it was noted a few [1:01:46] minutes ago, um, there is a bond [1:01:48] resolution up, I believe, tomorrow [1:01:50] night, that's going to actually address [1:01:51] item number two. Um, and then I believe [1:01:55] also anticipated with that is some HVAC [1:01:57] work as well. So, priorities one and [1:02:00] two, we're starting um, uh, developing a [1:02:03] pathway forward. So, we're managing [1:02:05] these assets and then, you know, as as [1:02:08] noted, we actually have money [1:02:09] appropriated, set aside. I believe we [1:02:11] will be, you know, kicking into higher [1:02:14] gear the the feasibility study come this [1:02:16] summer with it anticipated ending in and [1:02:19] around January. My thought process at [1:02:22] that time is and this is all subject to [1:02:24] change is then we would be seeking you [1:02:26] know an appropriation a bond resolution [1:02:28] for design and we would start designing [1:02:31] uh the Pine Hill station. Um once we [1:02:33] have that understood better then we [1:02:35] would obviously seek uh approval for [1:02:37] construction. Uh this is all baked into [1:02:43] the overall comprehensive conversation [1:02:45] that we've been having as a community [1:02:47] about what our appropriate level of debt [1:02:50] service should be and making sure these [1:02:53] uh various projects fit within our [1:02:55] capital plan. Um, I think after [1:02:58] tonight's conversation, um, we owe it to [1:03:01] to to this body and to the fire [1:03:03] commissioners to to internally discuss [1:03:06] how we fit the puzzle pieces together, [1:03:08] knowing the policy directive has been [1:03:11] that the city of Nasha doesn't want to [1:03:13] authorize any more new debt than about [1:03:16] uh, approximately $20 million [1:03:18] year-over-year over the next five years. [1:03:21] So knowing that, how do we make that [1:03:23] work with uh the needs that the fire [1:03:25] department have as well as all the other [1:03:27] needs of the of the city um and and and [1:03:30] that's that's very much forefront in in [1:03:32] my mind and one of the reasons why I [1:03:34] wanted to kind of start that [1:03:36] conversation this evening. Thank you, [1:03:39] Almano. [1:03:41] Um so I I understand that it was it's a [1:03:44] u you know not a a firm number. Um but [1:03:49] you your estimation was [1:03:52] 102 million if I remember correctly that [1:03:55] included the escalator. [1:03:57] Yes that um information is for uh new [1:04:01] facilities only. It does not include the [1:04:04] remodels. And so that it basically it's [1:04:08] a range [1:04:10] of I guess let me back up a little bit [1:04:13] um because I feel like maybe it's [1:04:15] addressing um multiple questions or [1:04:17] comments here. Um this information is [1:04:20] essentially a menu. you know, it's it's [1:04:23] for it's for you to to consider and take [1:04:26] our professional opinion and the data um [1:04:30] and the needs assessment and then pick [1:04:32] and choose what is of most importance to [1:04:35] the city and the fire department. So, [1:04:37] that's why I'm saying like big millions. [1:04:39] It's make believe like it doesn't [1:04:40] nobody's going to get 100 million or 150 [1:04:43] million to do anything ever. But this is [1:04:45] just the information that it puts a [1:04:48] period at the end of the report that [1:04:50] says the these are all of your [1:04:52] opportunities and deficiencies both from [1:04:54] a building standpoint, infrastructure [1:04:56] systems and programmatic um relative to [1:05:00] industry best practices. So this is sort [1:05:02] of the this is the answer that everybody [1:05:05] gets at every meeting that we have like [1:05:07] this at the end of a project. It's these [1:05:09] kinds of numbers. I mean, some of them [1:05:11] are like 200, $300 million because [1:05:15] you're just talking all in if we were [1:05:16] going to do everything. But I just want [1:05:18] to stress that these numbers are just [1:05:21] representative of every single thing [1:05:23] that we've asked and we've heard that [1:05:25] we're needed or doesn't work and needs [1:05:27] to be fixed or replaced. So, the numbers [1:05:30] aren't real. I don't want to say the [1:05:32] numbers aren't important, but the [1:05:33] numbers don't really mean anything until [1:05:36] you actually make them a project. Say [1:05:38] that again. [1:05:40] The numbers don't really matter. They [1:05:42] only matter when you choose to make it a [1:05:44] project. I I can't stress that point [1:05:46] enough. I'm I'm very uncomfortable with [1:05:48] some of these numbers because we latch [1:05:50] on to them and then this is the number [1:05:52] that I you know, you say to me, "Oh, [1:05:55] we're going to do the project for this [1:05:57] amount." I'm going to tell you right [1:05:58] now, we are not doing a new station [1:06:00] number five for $30 million. Just I I [1:06:04] hate to say it, but we can't do anything [1:06:06] for $30 million for new construction. [1:06:08] That's just the reality of our [1:06:10] marketplace. Um there's a lot that needs [1:06:13] to be further designed and figured out [1:06:15] before we hone in on the number, but I [1:06:17] would say that that is uh that is a good [1:06:19] jumping off point that to set [1:06:21] expectations. It's not going to be [1:06:22] anything lower than this. And that's [1:06:24] just what we need to kind of understand, [1:06:26] right? And that's it just really is the [1:06:28] it's the culmination of all of the [1:06:31] information that we've been able to [1:06:33] process. So it go ahead. [1:06:37] followup. Yeah. So, that kind of [1:06:40] answered where I was heading. So, and I [1:06:42] and I get it. So, my my point was going [1:06:45] to be if we're talking 102 that had your [1:06:48] uh combined 12 escalator in there. Um [1:06:52] the escalator is included. Everything [1:06:55] that is included. Yeah, absolutely [1:06:57] correct. And that it's two years of [1:06:58] escalation, so it's an it's 9% which of [1:07:01] course we can adjust. Understood. Um, my [1:07:04] point was going to be that director [1:07:05] Cummings [1:07:07] was suggested that it's probably gonna [1:07:09] be 25 to 30% on top of that. Um, and now [1:07:13] that this isn't even the full lot, I [1:07:16] guess I didn't pick up on that. That [1:07:17] that was just the new items. So, if we [1:07:19] went with um from the menu and picked [1:07:22] all our favorite flavors of all the menu [1:07:24] items, I mean, we're probably talking [1:07:26] almost $400 million. [1:07:29] Well, I Yeah, I I mean I got we have got [1:07:32] to talk because I don't know where [1:07:34] you're getting your numbers and you [1:07:35] don't know where I'm getting my like I [1:07:37] but I do I really I'm very curious about [1:07:40] and and that's kind of what I was [1:07:41] looking for was just all right are we [1:07:43] talking you know I get it big numbers I [1:07:46] get it um [1:07:49] but if there was any conversations that [1:07:50] have happened that you know if we really [1:07:53] want the best of what's on the menu you [1:07:56] know are we approaching the 300, the [1:07:58] 250, the [1:08:00] 400 ballpark. His answer is going to be [1:08:03] yes and mine's going to be no. Yeah. I [1:08:05] mean, it really depends. It really [1:08:07] depends. I mean, it's so amorphous at [1:08:11] this point because there's so many [1:08:12] details that need to be worked out. Um, [1:08:16] and I don't know enough yet to comment [1:08:19] more than that, but I mean I I I tend to [1:08:21] shy away from commenting on deferred [1:08:23] capital maintenance this whole side of [1:08:25] the ledger because this is this is [1:08:27] really specific and really complicated [1:08:30] the new construction. I I feel much more [1:08:32] confident talking about I mean and I [1:08:34] don't know what square footage and we we [1:08:37] could just go back to, you know, you [1:08:40] know, station number five, the new [1:08:41] station number five at $30 million. I [1:08:44] don't know what they're projecting for [1:08:45] square footage, right? And then what? [1:08:48] 25,000. So 25,000 square feet and you're [1:08:52] projecting what for per square foot? [1:08:55] $500ish [1:08:58] for fire stations. We're like seven. And [1:09:01] I'm going to tell you right now, we're a [1:09:02] thousand. Yeah. So that's just a jumping [1:09:04] off point. And that's hard construction [1:09:05] without even talking about soft cost. So [1:09:08] at 25,000 square feet right there, [1:09:10] you're going to be at $25 million. and [1:09:12] I'm going to tell you to add another 10 [1:09:14] for soft cost on top. That puts you at [1:09:16] 35 million. That's just the ball game [1:09:18] that we're talking about. So, we we kind [1:09:21] of need to talk through the details a [1:09:22] little bit more, but that's that's just [1:09:24] our market. [1:09:26] And it's 10% cheaper here in New England [1:09:28] than it is on the West Coast. That's [1:09:32] it's wild. Yeah. [1:09:35] Okay. Uh Chief Buckton. [1:09:39] Yeah. I'd like to uh Steve Buckton [1:09:41] National Fire. I'd like to uh thanks [1:09:43] thank them for their work. Uh it's a [1:09:45] great presentation as you can see it's [1:09:46] very comprehensive and this is just kind [1:09:49] of an a high level view for you tonight. [1:09:52] Uh Adam's going to be the one that's [1:09:53] driving this uh within our [1:09:56] organization. Um you know this was [1:09:59] kicked off because of master plan that [1:10:01] we invested in for the fire department [1:10:03] that laid things out for approximately [1:10:05] 10 to 15 years. Uh we've done three of [1:10:09] those at Nashville Fire throughout the [1:10:11] years. They're all stacked up on the [1:10:12] bookshelf in there. Some of them were [1:10:14] done and they went on the bookshelf and [1:10:16] really not a whole lot ever happened [1:10:18] with them. I'm proud to say this master [1:10:20] plan that we did in 2021 and this [1:10:22] strategic plan um I have in my office [1:10:25] chief roads before me uh myself and we [1:10:29] go through and we update it uh when [1:10:31] we're checking boxes off. This facility [1:10:34] study was laid out in there to be done. [1:10:37] This is just another roadmap for us to [1:10:39] follow into the future. Uh I agree with [1:10:42] uh Director Cummings, you know, don't I [1:10:44] don't want to say don't get hung up on [1:10:45] the cost, but until we actually turn it [1:10:47] into a project, um that's where we we [1:10:50] come looking for money. And I think the [1:10:53] fire department does a really good job [1:10:54] uh of working with uh the members of the [1:10:58] board of alderman, the mayor uh to find [1:11:00] our place in line, so to speak. Uh we [1:11:02] recognize the pie is only so big. So, [1:11:05] you know, $100 million is is a really [1:11:07] big pie, really big piece of the pie. [1:11:09] Um, and at the end of the day, um, [1:11:12] somebody has to manage all this within [1:11:13] our organization. And that guy right [1:11:15] down there, he does a really good job, [1:11:17] but facilities is just one one part of [1:11:20] his area of responsibility. So, if you [1:11:23] let me walk out of here tonight with [1:11:25] $100 million to attack all this, we we [1:11:28] we don't have the bandwidth to [1:11:30] accomplish it at that. [1:11:33] Yeah. So, but as as you heard, the [1:11:36] priority items are already on the radar. [1:11:38] Uh, and I'll be back here tomorrow night [1:11:41] uh to uh speak to the bonds that we're [1:11:43] looking to get work started. So, thank [1:11:46] you. Yeah, I would like to say thank [1:11:49] you, Chief. [1:11:50] Um, in my involvement with the [1:11:53] department of over, you know, for 35 [1:11:56] years, a lot of these stations weren't [1:11:59] built. We have two that are fairly [1:12:02] modern and even they have some problems [1:12:05] you know due to uh lack of uh [1:12:08] maintenance and everything but [1:12:11] uh a lot of these are very old [1:12:14] structures the [1:12:16] uh I don't know the ethic or the new way [1:12:20] of the fire service has changed you know [1:12:23] we got rid of the horses years ago you [1:12:25] know so we have motorized apparatus so [1:12:29] stations can be farther apart because [1:12:32] horses don't have to run that far [1:12:34] anymore, you know, and uh you know, we [1:12:38] actually invented the toilet. So, you [1:12:40] know, things are working out good. But [1:12:43] the thing is, the main thing is, and you [1:12:46] you guys are on the infrastructure [1:12:49] committee, you've seen it here before, [1:12:51] past boards [1:12:54] ignored a lot of this problems. Engine 5 [1:12:57] was built in [1:12:58] 1961. It was built cheaply in [1:13:03] 1961. You know, construction is good. [1:13:06] The place hasn't fall down, but it's [1:13:09] small, cramped, everything. Uh I was [1:13:12] captain of the house there. The guys are [1:13:15] working out on the same floor that the [1:13:18] truck is on. And when the truck starts [1:13:20] off, you do get some [1:13:22] byproducts of the combustion of the [1:13:24] engine, you know, and it [1:13:27] stays in there. And uh I don't know, [1:13:31] Chief Pullard, did you take him to the [1:13:33] former Crown Hill station? Did not. Can [1:13:37] you please, cuz I was captain of the [1:13:39] house there, please look at that. You [1:13:43] know, I mean, you will say they lived [1:13:46] here cuz I went there and worked there [1:13:48] and said, [1:13:51] "God, it was bad." My first night at [1:13:54] Lake Street Station, [1:13:57] uh, I slept there. It was in the middle [1:13:59] of winter time and I I couldn't sleep [1:14:01] because the shades the wind was coming [1:14:04] right through the window and the shades [1:14:07] flipping in the breeze all night. And [1:14:09] that just didn't happen the day before. [1:14:12] It's the years of neglect until finally [1:14:15] they got somebody to do this. We got to [1:14:17] as a city, and I'm saying this overview, [1:14:20] not just the fire department, but every [1:14:21] single facility. Look at we almost have [1:14:24] two parking garages that could collapse, [1:14:27] but we're working to, you know, smartly [1:14:30] so, and I compliment the mayor and and [1:14:33] uh director Cummings for prioritizing [1:14:35] some of these things. I know it's going [1:14:37] to cost the taxpayers some money, but [1:14:40] it's their buildings and they look at us [1:14:43] to try to maintain them the best way [1:14:45] that we can. And out of all the [1:14:48] facilities that we have, the one thing [1:14:50] to remember with the fire department, [1:14:52] people live in them. [1:14:55] They leave their nice cushy homes and [1:14:57] their lazy boys at home and they go to [1:15:00] the fire station, you know. So the [1:15:03] facilities the particularly the male [1:15:05] facilities and everything else like that [1:15:08] and now in the fire service they have [1:15:10] come out with right chief with more [1:15:12] rules of contamination. When I started [1:15:15] they gave you one fire coat and if it [1:15:18] got wet at the fire and you were going [1:15:19] out to your second one you wore the wet [1:15:23] coat. It's the way it was. We were [1:15:25] tougher back then, but anyways, you [1:15:29] know, not like today, but I don't want [1:15:32] to get it cheap, but it was the way it [1:15:35] was because the city don't want to buy [1:15:36] and they think now what we're buying two [1:15:38] sets of gear and we have to meet the [1:15:41] standards of the NFPA and everything. [1:15:43] So, uh, as far as the living [1:15:46] facilities, you know, I think we as a [1:15:51] committee, if we focus, this is a lot, [1:15:54] and I'm sure, and you stated that, I [1:15:57] don't think we have to bite it off in [1:15:59] one bite and chew it. You know, I think [1:16:01] what we need to do as a committee is sit [1:16:04] down with Chief Bucks, Director [1:16:06] Cummings, and Chief Pullard and try to [1:16:09] prioritize this. And I'm thinking we're [1:16:12] talking the bond tomorrow night. And I [1:16:16] think that's a good launching point to [1:16:19] see if we're going to support this to [1:16:21] see if we can mitigate the Pine Hill [1:16:23] Station. But I see this as a long-term [1:16:26] project. Uh this could take us [1:16:30] unfortunately as what we did with the [1:16:32] schools. We didn't build all the new [1:16:34] school facilities in one year. We did it [1:16:36] in the long term, you know, and we'll [1:16:39] have to watch the bonds the way things [1:16:42] are now happening with the economy and [1:16:44] everything and we'll have to go with the [1:16:47] advice of uh Miss Enright and other [1:16:50] people that know more about it. I don't [1:16:52] even do the checkbook at home so I can't [1:16:55] tell you. So, but anyways, uh I made the [1:16:59] money. The wife does it out. You know, I [1:17:02] stretched the line. She stretched the [1:17:04] the checkbook, you know what I mean? But [1:17:07] uh uh we'll have to, you know, just take [1:17:11] this in little bites and try to get it, [1:17:12] you know, the important things and [1:17:14] prioritize. Maybe we might be able to do [1:17:16] a roof a year or something like that and [1:17:19] you know, and take it value. And uh I [1:17:22] think what Director Cummings is saying, [1:17:24] I'm very interested and I've said it for [1:17:26] years from the beginning. Uh part of the [1:17:29] fire department budget is going out and [1:17:31] buying lawnmowers and everything else [1:17:33] like that to take care of the grounds [1:17:37] and you know plowing and sometimes we [1:17:39] need to help a DPW in some of the [1:17:41] stations to get rid of the big pile of [1:17:44] snow so that the drivers can see [1:17:48] access and vacating the building and not [1:17:51] cutting out in the middle of traffic. So [1:17:53] you know they need help with a lot of [1:17:55] these things. So, as we go in the [1:17:57] future, we'll take the small bites, I'm [1:18:00] hoping, and uh try to prioritize what we [1:18:04] need to do, and we're going to look at [1:18:06] you, chief, to come up with uh your list [1:18:08] of [1:18:09] priority priorities and uh we can [1:18:12] mitigate that. And uh Chief Pullard, [1:18:16] please take them to the former Crown [1:18:18] Hill station. [1:18:20] probably doesn't look much different [1:18:21] than Oh, I I had a mayor come in and [1:18:26] showed him when I was captain of the [1:18:29] facility and he says, "I'm sorry you [1:18:32] guys have to live like this and I'm [1:18:33] going like, you know, but you worked [1:18:36] there, Chief Bucks." Yeah. So, those [1:18:39] were the good days, you know. So, I'm [1:18:42] I'm glad we're on the right course and I [1:18:44] thank you for your presentation. [1:18:47] I'll have to ask uh what you presented [1:18:50] on the screen. Can we get a copy? Yeah, [1:18:53] I've asked I've asked Yeah, director [1:18:55] Cummings. All right. Because then we'll [1:18:57] put that as part of the uh minutes, the [1:19:00] minutes and everything. Is everybody [1:19:03] satisfied with their questions or [1:19:07] comments? No, I think we're good. So, [1:19:10] we'll move along on the agenda. Thank [1:19:12] you, Chief and Company. Thank you. And [1:19:15] it was good seeing you guys again. Thank [1:19:18] you. Thank you. [1:19:31] We can probably go on while they're [1:19:33] vacating. They don't seem like to be a [1:19:36] noisy group, so we can go on. [1:19:39] communications. [1:19:41] Uh, when are you guys heading back to [1:19:43] Seattle? Tomorrow. Tomorrow morning. Oh, [1:19:46] let's go to Reno tomorrow. Just like at [1:19:48] home. [1:19:51] All righty. Thank you again. [1:19:55] All right. Uh, communications [1:19:59] from Sam [1:20:00] Dery, planning manager. Referral from [1:20:03] the board of alderman on resolutions [1:20:05] R25159. [1:20:09] R25160, [1:20:11] R25161, [1:20:13] R25166, and the amended petition for [1:20:16] street discontinuence regarding a [1:20:17] portion of Veterans Memorial Parkway. [1:20:20] Okay, there being no objection, I'll [1:20:22] accept the communication and place it on [1:20:24] file. Unfinished business, there is [1:20:27] none. New business resolutions. [1:20:31] R25156 authorizing the sale of taxdeed [1:20:35] property located at [1:20:39] 115-117 West Hollis Street. Um, Mr. [1:20:42] Chairman, I motion to recommend [1:20:44] approval. Final approval. [1:20:48] Final passage. Sorry, final passage. [1:20:50] Very good. Uh, director, you could have [1:20:52] a seat if you wish or you're fine there [1:20:55] at the Diaz. I anticipate a more [1:20:56] transient visit, but that's okay. [1:20:59] Well, [1:21:00] Mr. Chair, I'm joking. [1:21:08] Mr. Chair, may I? Yes, you may, please. [1:21:11] Uh, good evening. For the record, Matt [1:21:13] Sullivan, community development division [1:21:14] director for the city of Nshawa. Uh, [1:21:16] here on behalf of R251 156, authorizing [1:21:21] the sale of taxdeed property located at [1:21:23] 115 through 117 West Hall Street. Uh [1:21:26] before I get into the substance of the [1:21:28] legislation, which is albeit fairly [1:21:30] brief in in the number of words, um I [1:21:33] want to just note for the record that [1:21:34] this address may be familiar to some of [1:21:36] you uh sitting around the horseshoe this [1:21:38] evening. This was actually part of a [1:21:40] previous piece of legislation through [1:21:41] the tax deeding process, but I'm going [1:21:43] to give you a brief history and then [1:21:45] talk about what this legislation does [1:21:47] moving forward. U the property itself, [1:21:49] 115 through 117 West Hall Street, is [1:21:52] located on West Hall Street. It's a a [1:21:54] 2-unit building currently with a parking [1:21:55] area and a garage in the rear of the [1:21:57] site. It's approximately 28.29 acres in [1:22:01] size. Uh and was actually on April 21st [1:22:04] of 2023 uh taken by the city of [1:22:06] Nashville via the taxing process that I [1:22:08] think you're all familiar with. Uh [1:22:10] subsequently as part of that process in [1:22:12] September of 2023 [1:22:14] uh via an auction process or the the [1:22:16] city rather authorized an auction [1:22:18] process which is of course customary to [1:22:20] these properties. Subsequently on [1:22:22] October 7th of 2023, [1:22:24] um the property was in fact auctioned, [1:22:27] but over the course of uh the coming [1:22:29] weeks and months, ultimately the buyer [1:22:32] chose not to close on the property. As [1:22:34] part of that, they actually forfeited a [1:22:36] $10,000 deposit, but ultimately the [1:22:38] property was not closed upon and [1:22:39] therefore the city has remained or [1:22:41] rather the property has remained in the [1:22:43] city's care over the course of time [1:22:44] since then. Subsequently, as part of uh [1:22:47] what I would call strategic discussions [1:22:50] between the city's land use leadership [1:22:51] team and the tax collection leadership [1:22:53] team, um we had some conversations about [1:22:56] this property in the context of the [1:22:58] city's affordable housing and housing [1:23:00] needs more generally. And admittedly, [1:23:02] we've been having uh conversations in a [1:23:04] variety of different ways around [1:23:06] properties like this, particularly [1:23:07] multifamily or duplex properties that [1:23:09] may for one reason or another uh be a [1:23:12] small step forward or an incremental [1:23:14] step forward in solving some of the [1:23:15] city's affordable housing challenges and [1:23:17] crisis. And particularly we've looked at [1:23:20] these properties in the context of uh a [1:23:22] section of state statute that allows the [1:23:24] city to dispose of properties through an [1:23:26] alternative method if in fact [1:23:29] disposition through an alternative [1:23:30] method meets a public interest or a [1:23:32] public purpose. Uh and it's been our uh [1:23:35] conversation internally at least and I [1:23:36] think that's why we're here this evening [1:23:38] that solving or incrementally working [1:23:40] towards bettering the city's affordable [1:23:42] housing challenges is in fact a public [1:23:44] purpose and in the public's interest. [1:23:46] And therefore, uh, we've brought forward [1:23:48] the legislation tonight to actually [1:23:50] through an alternative disposition [1:23:52] process put 115 117 West Hollister [1:23:55] Street out through a request for [1:23:56] proposal process. This will be familiar [1:23:58] to you in particular you Alderman Tibido [1:24:00] going recently through um, of course the [1:24:02] Elm Street process. This is a much [1:24:04] smaller scale. This is a very small [1:24:05] property. it's a two-unit property, but [1:24:07] ultimately the goal is the same, and [1:24:09] that is to put out an RFP likely to a [1:24:11] very small developer that owns [1:24:13] properties of this size, uh, or perhaps [1:24:15] even an area nonprofit that works on [1:24:17] affordable housing. We would solicit [1:24:19] proposals into the city. There would be [1:24:20] a review team. We would ultimately go [1:24:22] through the selection process, but the [1:24:24] idea would in fact be to see an [1:24:25] affordable housing proposal for this [1:24:27] site at 115 and [1:24:29] 117. Um, therefore, the legislation in [1:24:32] front of you, just to overview, does a [1:24:33] couple of different things. One, it [1:24:36] authorizes the city to dispose of the [1:24:38] property through an alternative method [1:24:40] that is typically used, which is [1:24:41] typically the sealed bid and auction [1:24:43] process. In replacement, it allows us to [1:24:45] go through an RFP process and put this [1:24:47] this property out to the public and [1:24:49] development community to respond to. And [1:24:51] then lastly, it of course authorizes the [1:24:54] mayor to enter into a purchase and sale [1:24:56] negotiation and to ultimately sell the [1:24:58] property to an affordable housing entity [1:25:00] that will uh convert the property [1:25:02] whether through demolition of the [1:25:04] current structure or redevelopment of [1:25:05] the site uh or redevelopment of the [1:25:07] current structure that exists there. Um [1:25:09] again, this is all underpinned and this [1:25:11] is laid out in the legislation before [1:25:13] you by the idea that affordable housing [1:25:15] and housing creation and affordable [1:25:17] housing preservation is in the public's [1:25:19] interest. And that's why we're bringing [1:25:20] this forward to you this evening. Happy [1:25:22] to answer any questions that you might [1:25:23] have, but look forward to working on not [1:25:26] only this property, but potentially [1:25:27] other smallcale properties that are [1:25:29] taken through the tax deeding process to [1:25:30] hopefully uh better the city's efforts [1:25:33] towards creating affordable housing. [1:25:34] Thank you. Thank you, Alderman Clay. [1:25:38] Thank you. Um Mr. chairman. [1:25:41] Um I guess the question that I have is [1:25:45] does this mean that this sale can happen [1:25:48] without the city having to recoup the [1:25:52] back taxes or any of the the loss of [1:25:59] um cost of of all of this? And the [1:26:01] reason I'm asking about this is that for [1:26:05] complete transparency, I will um I I [1:26:09] don't know if I had this conversation [1:26:10] with you or I know I had it with [1:26:13] somebody within the city. Um I was [1:26:15] approached um and I'm not going to say [1:26:18] by who. um by an entity that was um [1:26:22] asked if I would try to shepherd um a [1:26:26] almost a donation of this property um to [1:26:30] an entity um that wanted to [1:26:34] um build homes something similar to [1:26:37] this. And um in in looking into this, I [1:26:41] I think I spoke to Miss Enright and you [1:26:43] know the the whole process was this was [1:26:46] not allowed and I said it would be for [1:26:49] the public good and I kind of looked at [1:26:51] that one particular process and the [1:26:54] whole thing was that no the city had to [1:26:55] recoup it and and so on. So I kind of [1:26:58] went through all this whole thing. Um [1:27:01] the the person said oh no you know I'm [1:27:03] willing to try to do money and and so [1:27:06] on. I'm gonna be on. It was not a a [1:27:08] private person. It was a an [1:27:10] organization. So, but I don't want to [1:27:13] give the name and so on. Sure. Um, so [1:27:17] that's why I'm asking this question. So, [1:27:20] certainly, Mr. Chair, I I'll respond to [1:27:21] that if you're comfortable. Um, so [1:27:24] the the statute contemplates a few [1:27:27] different modifications to the rules and [1:27:29] and I'll ref I'll reference the two that [1:27:31] you're referring to, uh, Alderwoman Cle. [1:27:33] one being the the payment of back taxes [1:27:36] and what's owed to the city and the [1:27:37] other being the idea of disposing to the [1:27:40] of the property through a a reasonable [1:27:43] uh fair market value. Right. That's the [1:27:45] other contemplation of the statute and [1:27:47] and like you've like you've said we have [1:27:49] had inquiries from several entities uh [1:27:51] interested in in this property whether [1:27:53] for affordable housing, market rate [1:27:55] housing or even other uses. And so [1:27:57] there's no secret that we've had those [1:27:59] those inquiries. [1:28:02] What the use of an alternative process [1:28:05] or disposal process does is it does [1:28:09] modify albeit indirectly the fair market [1:28:14] value piece of the statute. And what I [1:28:16] mean by that is if an public purpose is [1:28:20] identified, there's it's not held to [1:28:22] necessarily the same standard when it [1:28:24] comes to what a fair market value is. [1:28:27] Now here the fair market value metric [1:28:29] will be fair market value affordable [1:28:31] affordable housing development and so we [1:28:33] still satisfy that section of the [1:28:35] statute. To my knowledge and perhaps I [1:28:38] should confirm this and I guess I'll [1:28:39] commit for the record that I will. To my [1:28:41] knowledge the need to as far as back [1:28:43] taxes being paid that is not modified in [1:28:46] any way by al by identifying an [1:28:48] alternative disposal method. Those [1:28:50] obligations still exist. Okay. That [1:28:52] process still is in place. But what does [1:28:55] change is the fair market value [1:28:57] establishment that's outlined in statute [1:29:00] that changes sort of inherently by [1:29:03] moving towards whether it's an [1:29:04] affordable housing play or some other [1:29:06] use that's identified as being a public [1:29:08] benefit or in the public interest. [1:29:10] Hopefully that answers your question. [1:29:11] Followup. [1:29:14] So please um correct me if if I'm saying [1:29:18] this. the the audience that you're [1:29:20] looking at kind of changes because [1:29:23] you're changing the the definition of [1:29:26] fair market value. So, prior to that, [1:29:29] you were putting it out to the highest [1:29:31] bidder. The city can only still [1:29:34] take can only accept a certain amount [1:29:38] and the remainder would have had to go [1:29:39] to the who you took it from. That's [1:29:43] absolutely. Now, what you're doing is [1:29:44] you're changing the audience to whom [1:29:46] you're selling it to because you changed [1:29:48] the definition of fair market value. Is [1:29:50] that correct? Uh, Mr. Chair, I'll [1:29:53] respond. That that is correct. One [1:29:55] assumption I want to be careful that we [1:29:57] don't make, which I've almost implied [1:29:58] I'm making myself, is that an affordable [1:30:02] housing uh development of the site will [1:30:05] absolutely undermine the market value. [1:30:07] That's not necessarily the case. It is [1:30:09] possible of course uh but ultimately [1:30:12] there will be the same obligation to if [1:30:14] there are excess revenues as a result of [1:30:16] the sale that same obligation exists to [1:30:19] dispose of back to the the prior owner. [1:30:22] I I want to confirm all of this outside [1:30:23] of this meeting because I I do want to [1:30:25] point out that there's a unique history [1:30:27] and fact pattern for this property [1:30:29] having gone out to auction having been [1:30:31] entered into through a a purchase and [1:30:32] sale but not ultimately closed. But I am [1:30:35] fairly certain that all of the same [1:30:36] provisions would apply. But I'll send a [1:30:38] confirmatory answer back to this [1:30:40] committee before this legislation [1:30:41] returns to the full board. Okay. Thank [1:30:44] Thank you. Okay. Alderman Solomon. Thank [1:30:46] you. I just want to understand [1:30:49] the process and what this resolution [1:30:52] says. So you you said it. Now I [1:30:55] processed it. Now I'm going to spit it [1:30:57] back to you and I want to make sure that [1:30:58] I understand it. The city owns this [1:31:00] property through the tax deeding [1:31:03] situation. There were back taxes. City [1:31:05] took it over. Typically that gets [1:31:08] auctioned off. Back taxes get [1:31:11] paid. Everything proceeds as normal. In [1:31:14] this situation, the city is going to [1:31:16] retain ownership of the [1:31:19] property for [1:31:21] now [1:31:23] until we get we're going to put it out [1:31:26] to RFQ for [1:31:29] um someone to develop it for affordable [1:31:32] housing. Once that happens, at that [1:31:35] point, the city will then sell the [1:31:38] property to said [1:31:40] contractor and and that money will come [1:31:43] back to to the city to satisfy back [1:31:46] taxes. I know I'm simplifying it, but I [1:31:50] want to make sure that I understand it. [1:31:52] Uh I think perhaps I should let you [1:31:54] speak to my legislation moving forward [1:31:56] because I think that's a perfect [1:31:57] summary. Okay. Y with the one exception [1:32:00] being that it will be an RFP process [1:32:01] rather than a qual process. But that is [1:32:04] essentially what will happen here. Yes. [1:32:05] Okay. City will retain ownership. RFP [1:32:07] will be released. RFP will reflect the [1:32:09] values contained within this resolution. [1:32:12] There'll be a selection process of a [1:32:13] preferred uh respondent essentially. [1:32:16] Yeah. Price will be negotiated. [1:32:18] Ultimately, the sale will proc will be [1:32:20] processed and then the same the [1:32:22] customary process with the sale of any [1:32:24] taxi to property will then go into place [1:32:26] as far as being paid back. All right. [1:32:28] Can I have a followup? Follow up. Are [1:32:30] you able to reveal what the back taxes [1:32:32] are on this property? [1:32:35] Uh, Mr. Chair, I I actually do not have [1:32:37] that answer tonight. I'm happy to send [1:32:39] it to the committee perhaps as part of [1:32:40] the the response to Alderman Cle's [1:32:42] question, but I I do not know Alderman [1:32:43] Sult. [1:32:45] That would be good if you could do that. [1:32:47] But also keep in mind where the person [1:32:51] that bid it on the property defaulted [1:32:53] and did not go to close. The initial [1:32:56] deposit is in the custody of the city. [1:33:00] 10,000 $10,000 went to the city, not to [1:33:02] the auctioneer. That is correct. Let me [1:33:05] confirm that there wasn't a split on [1:33:07] that though. There may have been some [1:33:08] split so I can get that answer as well. [1:33:11] Okay. All right. Anybody else questions? [1:33:16] Okay, then I will call for a vote. Uh, [1:33:20] all those in favor signify by saying I. [1:33:23] I oppose. Motion carries. Thank you. [1:33:28] Will the clerk, please? Next on the [1:33:30] agenda. [1:33:32] Thank you, Mr. Chairman. [1:33:35] R25-161 authorizing an amendment to [1:33:37] resolution R72-75 [1:33:41] laying out common sewers as it pertains [1:33:43] to the redevelopment of land in the [1:33:45] Veterans Memorial Parkway redevelopment [1:33:49] VMPR overlay [1:33:52] district. Mr. Chairman, I recommend [1:33:56] final [1:33:57] passage of our 25161. [1:34:00] All right. Uh you gentlemen, welcome. [1:34:02] You might as well come up and sit down [1:34:04] because you're here for two, right? Yes, [1:34:07] Mr. Chair. Okay. So, why don't you come [1:34:09] in? Welcome to the horseshoe. [1:34:14] Well, Director Cummings be [1:34:17] uh happy to I don't know if he wants to [1:34:20] associate with us. Rip. No, I was [1:34:22] actually getting ready to to get up to [1:34:24] the to the podium here and I was so I [1:34:27] was like, "All right, I might be." At [1:34:28] least they were nice to director [1:34:29] Sullivan this time. Director could join [1:34:32] us here if you He looks especially [1:34:33] sharp. [1:34:36] I learned sharing this week. [1:34:39] Alder woman Cle director Sullivan [1:34:40] certainly looks especially sharp [1:34:42] tonight. I know. [1:34:45] I know. I don't blame him. All right. [1:34:47] Since Director Cummings, you join us. Do [1:34:49] you want to segue into this? Yes. Thank [1:34:52] you, Mr. Chairman. So, uh uh again for [1:34:55] the record, Tim Cummings, director of [1:34:56] administrative services. Uh what we have [1:34:59] before you is legislation amending uh [1:35:02] some some contracts and some some prior [1:35:05] agreements that we had uh previously [1:35:07] approved because what we are here [1:35:10] tonight to talk about is the Mohawk [1:35:12] Tannery redevelopment. Um this has been [1:35:14] an ongoing project uh that's been near [1:35:17] and dear to to me over the years and to [1:35:20] many others in the city. Thank you alder [1:35:23] Clay. Um you click [1:35:29] uh so um [1:35:31] uh so with that being said uh the [1:35:34] project was uh a little bit way laid. We [1:35:36] were originally anticipating getting [1:35:38] underway with con uh remediation of the [1:35:41] site um uh last summer uh last fall. [1:35:46] That didn't necessarily come to [1:35:47] fruition. Um due to that we had to [1:35:50] rework uh some some some of the finer [1:35:53] details of the of the project to be able [1:35:55] to keep moving it forward. Um I will [1:35:58] leave it to the to the um development [1:36:01] team here to to speak to to speak in [1:36:03] more detail of the technicalities but um [1:36:06] I believe we are very close to getting [1:36:08] this project underway. Uh it is my [1:36:11] understanding that we have received uh [1:36:14] we have received or were about to [1:36:15] receive the final sign off from uh EPA [1:36:19] dees for 100% design of the remediation. [1:36:21] That is a critical milestone. Um once we [1:36:24] have that in hand, we really can can be [1:36:27] off to the races for the remediation, [1:36:29] which I still hope will be will be this [1:36:31] summer. But with that being said, I'll [1:36:32] hand it off to to Michael Develin to my [1:36:34] left here, who can who can uh walk you [1:36:36] through the finer points of of the [1:36:38] legislation this evening. Thank you, [1:36:40] Director Cummings. Uh, Mr. Chair, [1:36:42] members of the committee, can you please [1:36:44] just state your name for a [1:36:45] transcription, please? Yes. Uh, my name [1:36:47] is Michael Devon. I I represent Bllock [1:36:50] Holdings. Um, I'm here with attorney [1:36:52] Westgate. Uh, without Brad, this project [1:36:55] would be lost. I personally would be [1:36:56] lost, but um, greatly appreciative of [1:37:00] his efforts and his colleagues efforts. [1:37:02] Um, the Mohawk Tannery has been uh [1:37:04] before this committee as well as the [1:37:07] larger board a number of times. Uh, I'm [1:37:09] I'm thrilled to be able to report that [1:37:12] we're rounding third base, so to speak. [1:37:14] Um, we received final comments on the [1:37:17] 100% design from EPA and DEES uh last [1:37:20] week. Uh, we've done an analysis of [1:37:22] those comments. Uh, and we anticipate [1:37:24] file filing the final 100% uh design on [1:37:29] June 6th. Um this is a 2400page document [1:37:33] um that is certainly extensive if not [1:37:37] downright exhaustive in terms of the [1:37:39] level of detail uh that the engineering [1:37:42] consultants have gone through to to make [1:37:43] sure that we remediate the site uh well [1:37:46] um and and safely uh for the public [1:37:49] health risk that it imposes. Um great [1:37:52] thanks to the city staff for getting us [1:37:53] to this point uh and all the dealings [1:37:55] that we've had. I can't count the number [1:37:57] of times I've had a 10:30 uh call or [1:38:00] weekend call from Director Cummings or [1:38:02] Director Sullivan uh to make sure we [1:38:04] talk about finer points uh of the Mohawk [1:38:07] Tannery. Uh the staff has truly been [1:38:09] dedicated. Um as we all know, the Mohawk [1:38:13] Tannery site sits along the Nashville [1:38:14] River. Uh directly east uh is the [1:38:17] downtown area. Uh it's a great area uh [1:38:20] for development. Unfortunately, uh it [1:38:22] has been contaminated for for a number [1:38:25] of years. Um things started to change uh [1:38:28] for the site uh when Blle Holdings uh uh [1:38:32] ran by Bernie Plant at the time uh [1:38:34] reached a deal with the EPA uh to [1:38:36] redevelop the site uh by first cleaning [1:38:40] it up. Um the EPA has since uh increased [1:38:43] its commitment to the project from $6 [1:38:45] million to $9.5 million. uh that was [1:38:48] approved by Doge as well as uh upper [1:38:51] levels of the US DOJ um just recently [1:38:54] and it's currently in public comment uh [1:38:57] due to end on June 11th um in order for [1:39:00] us to have that agreement uh perfected [1:39:02] and and uh ready to [1:39:04] go. Um the reason why we've been at this [1:39:08] now for a number of years, uh Director [1:39:11] Cummings certainly well before me. Um [1:39:14] it's a a contaminated site. Um sitting [1:39:17] along the Nashville River are these two [1:39:19] large lagoons of carcinogenic materials. [1:39:22] Uh those lagoons sit within the [1:39:24] 100red-year flood plane. The tannery [1:39:26] started in the 1920s. Uh I I wouldn't [1:39:28] want to keep playing those odds if I was [1:39:30] the city of NSHA. Um throughout the site [1:39:33] there are also a number of uh scattered [1:39:36] uh bits of the tannery waste uh as well [1:39:39] as a larger landfill here uh which was [1:39:42] on the uh fimble uh door property uh as [1:39:45] well as scattered asus uh throughout. Um [1:39:48] the goal is to uh clean up the site uh [1:39:52] consolidate all the uh Carson jig [1:39:54] materials into a containment cell uh [1:39:57] elevate that containment cell over uh [1:39:59] the 500year flood plane line uh in order [1:40:02] to uh further protect the site. Put a [1:40:05] permeable cap on top uh and then uh make [1:40:08] use of the site uh into uh the [1:40:11] development that you have seen before [1:40:13] you. Um the legislation that has gone [1:40:16] before the the larger board uh had [1:40:18] various pieces to it uh including a [1:40:21] revised master site plan. Uh that's not [1:40:23] subject here tonight. Uh but that this [1:40:26] depicts some of the changes that that [1:40:28] were before uh the board. Uh before the [1:40:31] uh committee tonight are two uh pieces [1:40:33] of legislation uh [1:40:37] R25166. Um this legislation uh [1:40:40] contemplates easements uh through the [1:40:42] project site to uh the adjacent Tamposi [1:40:45] property. Uh one of the dealings that we [1:40:48] had to uh uh do with the city uh was to [1:40:51] lease the right-of-way parcel. Uh as [1:40:54] such uh lease the rightway parcel [1:40:56] through the remediation. Um as such um [1:41:00] we now have to have the city join in [1:41:03] some of the agreements that we've made [1:41:04] to the adjacent property uh including [1:41:07] access and utilitiesmen. Um to be clear [1:41:10] though um tonight we are asking the [1:41:12] board to table this uh bit of [1:41:14] legislation until the June 11th meeting [1:41:16] of this committee. Uh reason being that [1:41:19] we just received um redline comments [1:41:22] from uh council from uh the Tamposie [1:41:25] family that owns the adjacent land and [1:41:27] we want to attend to those comments uh [1:41:30] route those red lines uh through [1:41:32] attorney Leonard uh who's been [1:41:34] intimately involved in this project uh [1:41:36] so that the city is is accepting of [1:41:38] those changes and then uh bring that new [1:41:41] uh uh version before this committee on [1:41:43] the 11th which we are prepared which we [1:41:46] are already set to be before for a [1:41:48] public hearing on a street [1:41:50] discontinuence petition that we [1:41:52] previously had 166 this one here. Yes. [1:41:55] Yes, ma'am. [1:41:59] R25161. Uh we are asking this board to [1:42:02] pro uh or this committee to provide a [1:42:04] favorable recommendation to the larger [1:42:06] board. Uh what this uh legislation uh [1:42:10] contemplates is a uh existing uh sewer [1:42:14] trunk line uh which the city has uh [1:42:18] along the river uh next to where the [1:42:21] containment cell is and there's a sewer [1:42:23] siphon over here uh as well as going uh [1:42:26] further east. um amending the the the [1:42:30] easement itself uh to allow us BLock to [1:42:33] do work uh and install the necessary [1:42:36] structures that we need for the [1:42:37] containment cell um along that easement [1:42:40] that currently exists um and ensure that [1:42:43] the city uh will follow certain repair [1:42:45] protocols um if they ever need to uh [1:42:49] repair the sewer uh adjacent to the [1:42:52] containment cell. uh our consultants at [1:42:54] Halen Aldridge uh put together a repair [1:42:58] protocol uh which obviously the city [1:43:00] when they put their sewer in uh would [1:43:02] not have uh uh uh known at the time [1:43:06] because a design hadn't been uh designed [1:43:08] for the contain excuse me the [1:43:10] containment cell the containment cell [1:43:14] um so uh our consultants put forth that [1:43:17] protocol to uh city engineering staff [1:43:20] engineer Hudson uh and his team uh and [1:43:23] we agreed to uh what that protocol would [1:43:25] would entail. Uh so this legislation [1:43:27] just again reiterates that the city [1:43:30] needs to follow certain protocols. Um [1:43:34] and then ultimately uh we're we're [1:43:36] projected close uh July 15th uh subject [1:43:40] to change. There are so many players [1:43:41] involved in this project um that uh [1:43:45] that's that's the date we're projecting [1:43:47] but it is subject to change. Uh once we [1:43:50] begin the remediation it'll be two [1:43:51] years. [1:43:52] uh between uh remediation sign off uh [1:43:56] and then uh start moving forward on the [1:43:59] redevelopment [1:44:01] project and and that that completes the [1:44:04] presentation for tonight. Okay. Thank [1:44:06] you. Any questions from members of the [1:44:09] board? Autumn Sullivan. [1:44:11] Thank you. Regarding the uh [1:44:15] 166, that was the one that you're [1:44:17] requesting to the table. Yes. That had [1:44:19] the red lines issue. any um I don't know [1:44:21] what you can reveal, what you can't, but [1:44:24] have you taken a glance at the red [1:44:25] lines? Anything that that you see is uh [1:44:28] troubling or maybe non-negotiable or [1:44:31] anything any any landmines there that [1:44:34] you see? The one of the beauties of this [1:44:35] project is most people defer to attorney [1:44:37] West in terms of the redlinining and his [1:44:40] knowledge base. Uh so I have seen the uh [1:44:43] red lines because Brad wrote them. Yeah. [1:44:45] Okay. But I'll let him answer that [1:44:47] specific question if that that's okay [1:44:49] with Mr. Sure. If I may, Mr. Chairman. [1:44:51] Sure. [1:44:53] Thank you again for the record. Brad [1:44:54] Westgate, lawyer with Winer and Bennett, [1:44:56] 402 Ammerst Street here in NSHA. Um the [1:45:00] the red lines were creations uh that we [1:45:03] made today. We, my colleague Barbara [1:45:05] Halevy and I did um as the initial [1:45:08] drafts people of the uh easement [1:45:10] document based on a conversation we had [1:45:13] with council for the Temposi entities. [1:45:16] Um fundamentally the red lines are to [1:45:19] simplify a complex little aspect of this [1:45:23] um document that um I initially drafted [1:45:26] which with some comment now having [1:45:28] received from uh the Champosies council [1:45:31] I can see a way to simplify it and also [1:45:34] to indicate how we had to add the city [1:45:37] as what I call an accommodation party to [1:45:39] the easement as Mr. Devon noted the [1:45:45] instead of acquiring fee simple full [1:45:47] ownership of the 4.4 4 acres that's [1:45:50] coming out of the Veterans Memorial [1:45:52] Parkway right away. That's part of the [1:45:53] site. We're going to lease it for a time [1:45:56] frame, but because of the commitments to [1:45:58] the Temposies both under our master [1:46:02] development agreement and also the [1:46:04] original legislation that contemplated [1:46:06] ultimate redevelopment of the Tannery [1:46:08] site, um we need to grant them these [1:46:10] easements uh upfront, if you will. So [1:46:14] that necessitated some structural [1:46:17] changes to the document which are [1:46:19] reflected in these red lines. I don't [1:46:21] think any of what we've done is going to [1:46:23] be a showstopper um both with the [1:46:25] Tamposies and with city staff and [1:46:27] attorney Leonard. Um but I do have to [1:46:29] walk through um with the Temposies those [1:46:32] changes better and also certainly bring [1:46:35] city staff up to speed with the why [1:46:37] we've approached it the way we did. [1:46:38] Okay. Thank you. [1:46:41] Okay. Any other [1:46:43] questions? Okay, seeing none, I'll call [1:46:46] for the vote. All those in favor signify [1:46:50] by saying I. I. Opposed. Motion [1:46:55] carries. And right now we're on to R [1:46:59] 25166 and I'll entertain by [1:47:02] recommendation a motion to table. [1:47:05] Alderman Clay. Yes. [1:47:08] R25-166 authorizing the city of [1:47:10] Nashville to join in the granting of an [1:47:12] easement for the benefit of map 62 lot [1:47:16] 100 and adjacent adjacent land in [1:47:20] connection with the redevelopment of the [1:47:21] former Mohawk tannery site. Mr. [1:47:24] Chairman, I recommend table to the next [1:47:27] meeting of June 11th. [1:47:31] Okay. And any uh discussion on that? Not [1:47:35] a table. No, I think he can have that. [1:47:38] No, not a table. Not on a tableling. No. [1:47:40] Um but I would like to say June 11th. [1:47:43] I'll have to check with the [1:47:44] administrative. [1:47:46] Uh we we do have a one of those intram [1:47:49] meetings. Yeah. Yeah. The booking if [1:47:52] it's available. Um so if you could check [1:47:54] with Don or I'll have Donna check June [1:47:56] 11th tentative to the Yeah. the clerk. [1:47:59] Mr. Chair, just if I may, um I believe [1:48:02] that notice has already gone out for a [1:48:03] public hearing for that night because [1:48:06] there's a there's a petition uh for [1:48:08] street discontinuence that we had to [1:48:09] amend uh based on uh these changes. [1:48:12] Well, if that's the case, that's [1:48:14] beautiful. Okay, good, Mr. Chair. All [1:48:16] right. I didn't want you to count on the [1:48:17] 11th and then we get something to [1:48:20] arrive. Okay. All right. The motion is [1:48:23] the table. All those in favor signify by [1:48:25] saying I. I oppose. Motion carries. [1:48:30] Thank you, gentlemen. Thank you very [1:48:31] much. Thank you very much. Okay. New [1:48:33] business ordinances. There is none. [1:48:36] Petitions, there is none. We do have [1:48:39] another item that is table, but it's not [1:48:42] going to come off the table. Nobody's [1:48:43] shown [1:48:44] interest. And um there's another one. [1:48:48] We'll leave that one on the table. Well, [1:48:49] yeah, it's petition for that's been [1:48:52] tabled for a while there, too. So, [1:48:54] general discussion. [1:48:57] Yes, [1:48:59] just I wasn't vocal on the the first [1:49:02] motions. I don't know if you had me as a [1:49:04] yes. I was confused for a second on [1:49:06] whether which one we were voting for. So [1:49:08] I'm a yes on 161. Oh, okay. And to table [1:49:11] on 166. I got confused at which one we [1:49:14] were Okay. You voted in the affirmative. [1:49:19] Correct. [1:49:22] Yeah. Okay. And there's nobody here for [1:49:25] public comment and remarks by alderman [1:49:27] is the same as general discussion. I [1:49:30] agree. I get confused by those too. [1:49:32] Yeah, we can we were looking to modify [1:49:35] splitting hairs. Mike, yeah, I know. [1:49:37] Unless somebody has something that want [1:49:39] to share. Oh, good. Good. I think we [1:49:41] should get rid of general discussion and [1:49:42] just go straight to I would agree with [1:49:45] that. Mark's bike. I think they're [1:49:47] working on it. Yeah. [1:49:49] All right. And so now I'll look to [1:49:52] Alderman Clay for the next motion. Your [1:49:54] favorite one? Yes indeed. [1:49:57] I'd like to motion to adjurnn. Okay. The [1:50:01] motion is to adjurnn. All those in favor [1:50:03] signify by saying I. I. Oppose. Motion [1:50:07] carries. Uh, and I'll declare the [1:50:10] meeting closed at uh 8:50 p.m.