[0:00] Why don't we start with the [0:01] introductions? Uh, I don't see Rrista, [0:04] so I guess I'll start. Uh, Jack Walsh [0:07] from Derby, and I'm co-chair of the [0:09] committee. [0:11] » Uh, Desra. [0:13] » I'm Desra Blanchard, uh, communications [0:16] and community engagement director with [0:17] NVCOG. [0:18] » Yeah. Aaron Yaron Budd. I'm the [0:21] environmental planning director here at [0:22] NVCOG. Tom [0:26] Dhy, environmental planner, NVCOG. [0:29] Emily. [0:32] » Hi, I'm Emily. I'm a designer at Stimson [0:34] Landscape Architects. [0:36] » Uh, Christine. [0:39] » Hi, I'm Christine. I'm a senior [0:40] environmental planner with Envy Cog. [0:43] » Paul. [0:44] » Yeah. Paul Benvich Water, downtown [0:46] engineer. [0:48] » Okay. The other Paul. [laughter] [0:50] Paul. [0:51] » Paul Woodworth. Uh, senior director of [0:53] ecological restoration at Save the [0:54] Sound. [0:57] Michael. [0:59] » Hi, Michael Inquis from Simpson [1:00] Landscape Architect. [1:02] » Okay. City of Waterberry. [1:05] » Good morning. Judy Mancini. I'm adviser [1:07] to Mayor Paul Pernooki. [1:10] » Molly, [1:17] » You just muted yourself. Molly, [1:25] you want to unmute yourself and [1:27] introduce yourself? There you go. [1:29] » Hi, sorry having technical issues, but [1:31] I'm Molly Johnson, uh, environmental [1:33] planner at NVCOG. [1:35] » Mark [1:38] Nielsen with NVCOG. Um, [1:42] okay Jeff. [1:51] » Hi Jeff Barilla. Uh, community liaison [1:54] at Save the Sound for the Kenny Town Dam [1:56] Removal Project. [1:59] » Jerry Jerry Lucowski, director of public [2:02] works, Water Town. [2:04] » Daisy. [2:07] » Hi, Daisy Everingham. I'm an [2:09] environmental planning intern here at [2:10] MVCOG. [2:12] » Kevin. [2:13] » Uh, good morning. Kevin Ellis, senior [2:15] engineer at MVCOG. [2:17] » Okay, Glenn. [2:19] » I'm Glenn Valentine, principal from [2:22] Stimson Landscape Architecture. [2:24] » Okay, Michael. [2:30] » How you doing? Michael Dham, uh, [2:32] director of parks and recreation, [2:33] Watertown. [2:35] » Okay, next one I'm going to butcher. [2:39] video. [2:40] Not even close, I don't think. [2:42] » That's all right. Good morning, [2:43] everyone. Um, my name is Tao Ola. I'm a [2:47] transportation planner at Envy Chicago. [2:49] » Okay. Denise. [2:51] » Uh, Denise Rap, First Leman, Town of [2:53] Lichfield. [2:55] » Cleave. [2:56] » Yes. Hi, I'm Cle, town of Lichfield. [3:00] » Tommy. [3:08] Tommy Rack, you there? [3:11] » Yeah. Yeah, I'm here. [3:13] » Okay. Who are you representing, Tommy? [3:15] » I'm with Envy Cog. [3:16] » Okay. Bobby. [3:19] » Hi. Bobby Brown, a communications [3:21] associate with NVCOG. [3:23] » Hey, Tony. [3:26] » Tony Adilly, town of Thomson ladies [3:28] administrator. [3:29] » Hey, Burke. [3:34] » Hi, Amanda. Uh Thomas Greenway chair. [3:37] » Okay. Uh KP's iPhone. [3:42] » Hey, good morning. This is Kate Peipa, [3:45] transportation planner and VCOG. [3:47] » James. Oh, James Culpa. [3:50] » Uh James Culpa, VHP oversee projects in [3:53] the transportation alternatives program [3:55] as well as a steep grant program. [3:57] » Okay. Vince. [3:59] » Yeah, Vince Seafford. I'm a volunteer [4:02] for Ngatuck and when I'm doing my paid [4:05] job, I'm a construction engineer at GGA [4:07] Geo Environmental. [4:10] » Chris. [4:13] » Hi everybody. Chris Roberts. I'm with uh [4:15] the active transportation unit at [4:17] Connecticut DOT. [4:20] » Okay. Did I miss anyone? [4:23] » Jim Stewart, public works Nagatuk. [4:26] » Hey, this may be the largest crowd we've [4:27] ever had. I can't remember this many [4:29] people being on board. So, uh, those are [4:33] introductions. All right. Uh, let's see. [4:36] Erin, shall we go right into the [4:38] updates? Waterberry. [4:43] » Uh, good morning everyone. Um, we're [4:46] still in design on the greenway part. [4:48] We're in the process of finishing up our [4:50] rideway acquisitions and we're moving [4:53] slowly but surely forward in in process. [4:56] It's still being reviewed by the federal [4:59] government as far as that could be a [5:01] little bit up in the air, but we're [5:02] still proceeding forward and moving [5:04] along with the timelines as if we are [5:06] absolutely getting the remaining funding [5:09] on our project. [5:10] » Let's hope so. What What's the actual [5:12] distance of that section you're you're [5:14] working on? [5:15] » You know, I don't I think it's a couple [5:16] miles, but I can get that for you. I [5:18] don't have that right in front of me. [5:19] » Okay. Right. Uh and you got some good [5:22] publicity I saw the other day. [5:24] » Yeah, we did. It was a great day. It's a [5:26] great It's It's great. People enjoy it. [5:28] So hopefully again, slowly but surely [5:31] we'll get there. [5:33] » Let's hope so. [clears throat] Uh and [5:35] Sonia, [5:37] is that going to be you, Erin? [5:41] » Yeah. So, the last thing I heard and [5:43] maybe Jim Culpa can can chime in here. [5:46] Um was that um [5:50] were they approaching 30%. I think it [5:52] was under review. I can't remember [5:53] exactly what what the status was on [5:56] that. [5:56] » Uh Bill Anderson is typing right now. So [6:00] get an update from him. I think that's [6:02] where it's at. [6:05] » Working through some design details cuz [6:07] like one portion of that alignment is [6:10] getting excavated right now for a coring [6:12] operation. [6:14] » Okay. Yeah, that's controversial. [6:18] All right. But work is being done, so [6:20] they're moving along. Yeah, I'll circle [6:22] back when he's done typing me an update. [6:25] » Okay. All right. Uh, Watertown Jury, you [6:28] going to do both of those? [6:34] » I could have uh Paul briefed the our [6:36] Ngatuck uh um section. I could brief the [6:41] Watertown Steelbrook Greenway. Um it's [6:44] just about a mile length from French uh [6:47] street with flashing vehicans with a [6:50] bridge that's in production uh right now [6:52] in Alabama. Um the abupments uh are set [6:56] up, they're going to be poured uh [6:57] tomorrow for the bridge. Um once the uh [7:01] it's poured the concrete uh we're going [7:04] to start the paving and it's going to go [7:07] down to uh Unico uh field which is about [7:10] a mile away at the Unico Bridge. Uh [7:14] Colona is the contractor doing a good [7:16] job. Um and we look to be done uh [7:20] substantial completion on October 25th. [7:25] » Well, that's great. That's really good. [7:28] Right. How about the water town [7:30] sections? [7:30] » Yeah, the uh Noak River Greenway, we're [7:33] looking to hire a design engineer for [7:36] that 2.38 miles of trail. I'm trying to [7:40] get a status update and our request for [7:42] extension from deep uh wreck trails [7:45] because our uh grant runs out next [7:47] month. So, I've been a little been [7:49] working on that. I haven't heard back [7:51] from Kim Bradley yet or anybody up [7:53] there. So, I need to check today on [7:55] that. So, [7:59] Um, Beacon Falls. [8:03] Erin, is that back to you? [8:05] » Um, so is Kevin on? [8:08] » Yes, I am here. [8:10] » So, so, uh, Beacon Falls is working on a [8:12] lot application to, um, well, originally [8:16] it was to repave their main street. Um, [8:18] we've had discussions with the with the [8:20] municipality about, you know, it being a [8:23] really good opportunity to do a little [8:24] bit more or, you know, make a make a [8:26] bigger impact on downtown. And there's [8:28] definite implications with the greenway. [8:31] So, Kevin, who's our transportation [8:33] engineer here on staff, has been working [8:35] to sort of develop some concepts and [8:38] Kevin, if you want to sort of run [8:39] through those and talk about how, you [8:41] know, it impacts the or could impact the [8:43] greenway, um, that'd be great. [8:45] » Yeah, of course. Uh I will be sharing my [8:47] screen so we can go back to PowerPoint [8:49] right after but I can show the concept [8:51] plans. [8:52] » Um like like Aaron said uh we have a [8:54] lots of application with the town. It's [8:56] been in the works for a while and we've [8:57] been working with them to kind of uh [8:59] reinvision what uh Main Street can be uh [9:02] between uh if you're familiar with the [9:03] Beacon Falls between Route 42 the [9:05] intersection route 42 at Bethany Road [9:07] all the way north up to uh Church Street [9:09] where it kind of turns off of the old [9:11] route 8 alignment. Um, so I'll give a [9:14] quick highlight of the plans here. Uh, [9:16] and I guess I'll I'll double check. Can [9:17] everyone see my screen? [9:20] » Yes. Yes. [9:21] » All right. Excellent. So, um, I think [9:24] the biggest part of for that's relevant [9:26] for the for the Arctic River Greenway is [9:28] actually uh this little call out here, [9:31] which is kind of outside of the plan [9:33] scope, but is important to this project. [9:35] So, as part of the whole project, uh, [9:37] it's existing four lanes. Uh, as a [9:39] project goal, we wanted to slim it down [9:41] to two. So, and I'll talk more about [9:43] that when I go up the corridor, but [9:45] essentially we are cutting the roadway [9:47] width in half. So, question is how do [9:50] you tie into the existing state section [9:52] on South Main Street, Route 42 as it [9:54] goes south along the river and then what [9:56] do you do with that? So I talked to the [9:58] department maybe I started the [10:00] conversations maybe six weeks ago and we [10:02] decided together that what we can do is [10:05] we will abandon the uh 42 side the I [10:10] guess the westbound side the the the [10:12] side closer to the river and in part of [10:15] that abandonment we're not going to tear [10:16] up the pavement or anything we'll just [10:18] leave the pavement there and the Narctic [10:19] River Greenway can then just use the [10:21] existing alignment going all the way [10:23] down from the intersection Route 42 here [10:25] with uh South Main street all the way [10:28] underneath the Route 8 bridge all the [10:29] way to uh what's the name of the park? [10:31] Riverbend Park. Did I get that right, [10:32] Aaron? [10:33] » Yep. [10:34] » Okay. So, that that that that's probably [10:36] the biggest news with all this is we'll [10:38] be almost getting a free greenway just [10:40] using the old alignment. No need no need [10:42] to change the pavement. The striping the [10:44] striping can just be there. It doesn't [10:45] matter. Um and it's going to be really [10:47] wide section because this is what the [10:48] existing pavement structure is. We're [10:50] talking maybe 25 20 25 ft plus of [10:54] pavement that would just become the [10:55] greenway. [10:57] That's kind of the really the biggest [10:58] change as part of these plans and none [11:00] of it is being shown here because it's [11:01] technically outside of the project [11:02] limits. [11:04] But uh as you kind of go uh move uh [11:08] towards the north uh we'll have the [11:10] section of greenway tying to the [11:11] existing section that's ex that's right [11:14] that that's right uh against the Route [11:16] 42 or not Route 42 South Main Street [11:18] along the river that will remain in [11:20] place. That will just continue being as [11:22] is. Um, so as you move north, that [11:27] sector to greenway is still going to be [11:28] there. Obviously, the roadway corridor [11:30] is not very different. There's a lot [11:31] more grass between the greenway and now [11:34] the new two-lane road, on street [11:35] parking, that sort of thing. [11:38] And then even further north, uh, kind of [11:41] halfway between that, uh, on South Main [11:43] Street heading towards Depot Street [11:44] where that old like iron bridges, the [11:46] town wants to have some developable land [11:47] in this area. So really for the [11:49] greenway, we're talking about like [11:52] amenities, shops, sort of things that if [11:53] you're riding a bike, you can stop for [11:55] like a cup of coffee, maybe some ice [11:57] cream, maybe just like local shops along [11:59] the way. Just kind of it kind of gives a [12:01] really different context to the greenway [12:02] and more of an economic driver, which [12:04] obviously the town of Beacon Falls is [12:05] very interested in. [12:08] And then once we get to Deeper Street, [12:09] uh the existing greenway ends, but as [12:12] part of this project, we'll be creating [12:13] a multi-use trail that will be [12:15] continuing along North Main Street from [12:17] the greenway. So, we have this little [12:18] connector piece here, crosswalk across [12:20] depot, and then we'll kind of having a a [12:23] 12t wide greenway moving all the way up [12:26] along the corridor kind of past all the [12:28] existing businesses. Uh, again, the [12:31] roadway is now two lanes. So, with the [12:33] extra roadway space, we have room for [12:35] grass plantings, but but relevant here, [12:38] the greenway. So, this will kind of [12:40] continue up past the route 8 uh on and [12:42] off ramps intersection, and it'll [12:45] continue all the way up to the end of [12:47] the quarter, which is where North Main [12:49] Street will turn into Church Street. So, [12:50] this is where the greenway will end for [12:52] now. I know there are plans to get it [12:54] through the Naggatuck forest somehow. I [12:57] know I've had a lot of conversations of [12:58] how to do that, how much money it will [13:00] cost, but that that's a different topic [13:01] for a different day. [13:03] So really here uh the big highlights are [13:06] the Route 42 alignment south of Bethany [13:09] Road will the river side will become the [13:12] Narctic River Greenway which will extend [13:14] the greenway uh pretty significantly [13:16] down I think for about a mile or so and [13:19] then using the existing greenway [13:20] footprint. Obviously, the whole context [13:22] will be different, but really the [13:25] existing greenway will be there with new [13:27] shop shops along the way. And then we'll [13:29] be extending the greenway up past Depot [13:32] Street all the way up along North Main [13:33] Street to Church Street, kind of where [13:35] the end of the project limits are. So, [13:38] those are the big highlights for Beacon [13:39] Falls. I know it's a lot. I kind of [13:41] quickly said at once, so of course I'll [13:43] take any questions or comments or [13:45] thoughts about this whole project. [13:48] Do you have funding for this yet or? [13:51] » Yes. So, so the way lots of works is uh [13:53] they already applied for for application [13:56] funding. As part of the pro process, you [13:58] need to allocate funding for it. So, the [14:00] board has already approved this. Uh [14:01] right now we're looking at a $16 million [14:03] price tag for the whole quarter [14:04] improvements. Um this number is a is a [14:06] living number. It might change as the [14:08] project develops over time, but the way [14:10] lots of works is as an MVCOG, we get [14:13] around $10.8 million per year. projects [14:16] continuously roll in and then once a [14:18] project's ready to construct and we have [14:20] the funding set aside for in in our [14:22] coffers, uh, we can get it built. So, we [14:24] do have the funding kind of set aside [14:25] for this project already. [14:27] » Great. [14:29] Any questions? [14:33] Okay, let's move on. Good luck with [14:34] that. That sounds great. [14:35] » Thank you. [14:37] » All right. How about uh Harington? [14:44] All right, I guess we're back to you. [14:45] [laughter] [14:49] » Um, [14:53] so Nog I think Ngatuck we skipped. [14:58] » Oh, okay. Let's go back to I thought [15:01] that was part of the water tub report. [15:04] [clears throat] [15:05] » So Jim Stewart, uh, public works. Um, [15:10] Kleinfelder is still in preliminary [15:12] design. [15:13] We're currently grappling with uh the [15:16] section of of trail that goes between [15:20] Fields and in the existing driveway and [15:23] and the Salem Bridge over the Ngatuck [15:26] River. Um it's very tight. The road is [15:29] probably only, you know, 19 18 ft [15:32] two-way road at this point or the the [15:34] the access way to the fields. Um, so we [15:38] have to figure out what we're going to [15:40] do uh with the the parking which which [15:43] would be affected the the roadway and [15:46] the fencing to the field. So So we're [15:49] trying to figure out how much of the [15:51] fields we can lose, how much parking we [15:53] can lose, where we can relocate it, and [15:56] and how we're going to get through there [15:59] um with a trail. [16:03] » That sounds like a challenge. Yeah, it's [16:05] it's we're going to lose somewhere. [16:07] That's for sure. [16:08] » Yeah. [16:10] Lose somewhere and gain elsewhere. So, [16:12] » Yep. [16:14] » Okay. Anything else? [16:17] All right. Now, we'll go to Harington. [16:21] » I don't have any updates on Harington. I [16:24] think Ra was going to give an update and [16:26] I don't see her on. [16:27] » Well, if she comes on, we'll go back to [16:29] her. [16:30] » Okay. [16:31] » I I've got one that's not on there. Um, [16:34] and it's not for an extension, [16:37] but Derby got a grant of over a half a [16:41] million dollars, and it's going to be a [16:42] little different. Uh, the grant was [16:44] actually written by the economic [16:46] development director, and his effort is [16:50] to encourage development in downtown by [16:54] lighting the greenway. [16:57] So, they got over a half a million [16:59] dollars and it includes security cameras [17:03] and solar lighting. [17:06] Um, there are in the stage of putting [17:09] together an RFP for this. Uh, so we'll [17:12] see. But, you know, I don't know if any [17:16] other sections of the greenway have [17:18] intentionally put lighting on their [17:20] greenway and the implications that that [17:22] will have, but that that will be [17:24] something to watch and I don't have a [17:25] time frame. Erin, did you hear anything [17:27] more about this or Mark? [17:30] » No. [17:32] » Uh, no, I haven't. But uh, Jack, I think [17:35] the short section Seymour has lights on [17:38] it. [17:39] » Oh, okay. I didn't I didn't realize. [17:41] [clears throat] [17:42] » Yeah, it runs from uh 67 down to the [17:45] Ting uh Dam area. You know, it's real [17:48] short, but very put lights on that. [17:51] » I wonder if it gets any use. Yeah. See, [17:55] in Derby, the idea is that they're [17:57] building the all these new apartments [17:58] downtown, and I think it giving them [18:02] access to the uh the greenway after [18:06] normal work hours will be an incentive. [18:08] We'll we'll see, but it will cause [18:11] [clears throat] some challenges as well. [18:13] Uh I I thought the original grant was [18:15] including new fencing, but it looks now [18:18] it's not new fencing. It's just poles [18:20] that will be metal instead of the wood [18:22] that's there now. And the poles will [18:24] only be for the cameras um and the [18:28] lighting. So, we'll we'll see. [18:31] » And and Jack sort of remember going back [18:33] a number of years when uh that we were [18:36] first, you know, looking at redeveloping [18:38] the south side of Main Street. There was [18:41] a commitment on the on behalf of the of [18:43] the city to provide a some kind of trail [18:49] connection between the greenway over by [18:51] the river to the uh Derby train station. [18:57] was supposed to go more directly through [18:59] the um through that development site as [19:02] opposed to you know requiring people to [19:04] sort of go down to O Sullivan's Island [19:06] and sort of loop around and kind of a a [19:09] roundabout way you know and that was [19:12] always part of you know an agreement [19:16] with the city to to do that as the [19:18] redevelopment of the southside took [19:20] place. So just going forward if you can [19:23] keep that in the back of your mind and [19:25] see if that actually can ever be done. [19:28] » Yeah. I I don't even know who's in [19:30] charge of the city. I tried to find out [19:32] and all I got was that they're working [19:34] on an RFP. You know, they've had the the [19:37] grant was announced several months ago. [19:39] So [19:39] » Yeah, [19:39] » It's not moving along very quickly. Uh [19:43] » So we'll see what happens. But you know [19:45] it is important as you said Mark the [19:47] work on the the train stations all up [19:49] and down the north are taking place now. [19:52] So [19:53] » The idea of that was to uh because you [19:55] know one of our ideas when we were doing [19:57] the main street Route 34 project was to [20:00] build a section of trail along right [20:03] along the road right adjacent. But, you [20:05] know, the mayor uh you know, wanted on [20:07] street parking instead. And so, but sort [20:10] of the compromise was okay, on street [20:13] parking would go back in, but the city [20:15] would commit to try to build a more [20:18] direct connection to the train station [20:20] from the Derby Shelton Bridge uh point [20:24] again just to make it a quicker, you [20:27] know, quicker connection between Shelton [20:29] and Derby. [20:30] » Yeah. Well, we'll see what happens, but [20:33] again, they they they got over a half a [20:35] million dollars, so [20:38] they've got money to play with, so we'll [20:39] see what happens. [20:41] » The the other consideration there, and [20:42] I'm sure they're they're working on [20:44] this, but I know at least for the [20:46] sections that are on the flood control [20:48] wall, um, you know, there's very limited [20:51] things they can do and, you know, a [20:53] limited depth that they can excavate to. [20:56] So, you know, that that may be [20:58] difficult. [21:00] They also have an issue that they're [21:02] dealing with been dragging on for three [21:04] years now. Uh they have to do some major [21:07] work on the bridge that goes over the [21:10] railroads uh on the Husatonic side. They [21:14] actually allocated the money three years [21:16] ago and nothing has been happening. [21:20] story I keep getting is that uh they're [21:23] not able to contact the railroad company [21:26] and you know the railroads have [21:28] basically absolute control but uh they [21:31] determined that they had an agreement [21:34] with the railroad when they built the [21:36] bridge [21:38] and they can't proceed to do a half [21:40] million dollars worth of work if that [21:43] agreement isn't renewed because it [21:46] expired and no one knew. So, submissions [21:49] and derby. Uh, why don't we move on uh [21:52] to the funding submissions and [21:54] opportunities? Who's going to talk about [21:56] the Connecticut Deep Recreation Trails? [22:01] I don't know if Kim is on. [22:05] I don't see her. Um, so I think a bunch [22:08] of us are waiting to hear about uh [22:10] awards for the last round of Rec Trails. [22:14] Um, from what I understand, [22:17] um, [22:19] there's the bond commission actually [22:20] authorized more funding than than DEP [22:23] had originally um, expected, so they had [22:26] to go back and sort of re-examine [22:29] all of the applications that they [22:31] received. Um, it's quite a while ago [22:33] now. Um, so [22:36] you know, I was hoping to have an update [22:38] from Kim today and and sort of know when [22:40] we're gonna we're going to hear, but um [22:44] but I guess we'll just keep holding our [22:45] breaths. [22:47] » Well, it's nice to hear there's more [22:48] more money allocated anyway, so better [22:50] chance. [22:51] » I guess it's a good problem to have, but [22:53] [laughter] [22:54] [clears throat] [22:55] » Yep. [22:55] » All right. How about the DOT microrant [22:58] program? [22:59] » Hi everybody. [23:01] Uh quick update for you guys. Um year [23:05] three so far, um we've awarded just a [23:09] little over 600 and just about 650,000 [23:14] of our 750,000 plus we had some change [23:18] left over from last year. Giving out 140 [23:21] awards this year and we do have around [23:24] three. Um but we do have a limited [23:27] amount of funding. So, we're going to be [23:28] giving out two awards per COG um for [23:31] that and then that'll be it for this [23:33] year. Um no word yet on continued [23:37] funding next year, but hopefully we will [23:39] get another $750,000 to continue the [23:42] program. [23:43] » And what's the maximum amount for any of [23:45] the the individual grants? [23:46] » Uh $5,000. [23:48] » 5,000. Okay. [23:49] » Yep. [23:49] » Yeah. [23:52] » Okay. Any other funding uh reports? [23:55] » I don't know. So, if anybody is [23:57] interested in in our region at least, um [24:00] you can reach out to Taio who is on the [24:02] call. Um Taio, I don't know if you have [24:04] any [24:06] anything to add. [24:09] » No. Um Chris has said it all. I just [24:11] want to say thank you to this committee [24:13] because um I did get a lot of um um [24:16] applications as a result of it. Um Aaron [24:19] talking about it at the last meeting and [24:21] which was good. Um [24:23] we I can proudly say that we've been [24:25] able to award um grants to at least um [24:30] to all our municipalities at least two. [24:33] They've been two every municipality has [24:36] been covered under this program. We're [24:38] doing well. Um thank you to this [24:40] committee. We'll still keep receiving [24:42] applications [24:44] um until there's funding available [24:46] hopefully next year. So please keep [24:49] those applications coming in. Thank you. [24:51] Is the application available on on the [24:53] website? [24:56] » I have a website. [24:57] » Yes, it's on the CT website. [25:01] » Which website? [25:02] » I can drop the link in the chat. [25:04] » Okay. And if you go look in the chat, [25:07] James gave an update on the Ansonia [25:10] project. So, that's in the the notes. [25:14] Okay. Uh, well, we already mentioned it, [25:16] but how about an update on the [25:17] Waterberry Summer Family Day, which was [25:20] held on August 1st. [25:23] » Yeah, we had a we had a booth out there [25:25] along with some other um organizations [25:27] around Waterberry. Um, I think it was [25:30] aimed more at like school kids, but we [25:33] talked to a lot of parents about the [25:35] Greenway. There were probably a few [25:36] hundred people there. Um, a lot of [25:40] excitement about the greenway. a lot of [25:41] people we're we're so right in front of [25:44] the booth there where I'm standing and [25:46] and talking about something is the [25:49] greenway. So everybody that was actually [25:50] standing on the greenway when we're [25:52] talking to them and a lot of them didn't [25:53] realize that. So, it was it was really [25:56] cool to to talk to people about about [25:58] the greenway and about the plans and see [26:01] that, you know, everybody really seemed [26:03] pretty excited about about the prospects [26:05] and especially about Waterberry section [26:08] that's being designed now that, you [26:09] know, you could get from downtown all [26:12] the way down to um to uh Platill Road on [26:15] the greenway. Um was really exciting to [26:18] people. So, uh, it was fun and, uh, you [26:22] know, we're we're always willing and and [26:24] able to come out to your communities to [26:26] do these sorts of events, too. So, if [26:28] you want to promote the greenway, [26:30] um, we have a lot of materials, uh, we [26:32] can come out and speak if if we're [26:34] available. Um, so keep that in mind if [26:37] if you guys are having any kind of, um, [26:41] public engagement fairs, um, anything [26:43] like that, you know, we're we're always [26:45] happy to come out and talk to the [26:46] public. [26:46] » Hey, hey, Erin, it's Judy. I just want [26:48] to add to that that that came about um [26:51] as part of a committee we have here in [26:53] Waterberry, the Friends of the Greenway, [26:54] and they're very strong advocates of it [26:57] and and how great of a resource it is. [27:00] So, I know they are very excited by the [27:02] turnout, and we definitely appreciate [27:04] you guys all turning out for it as well. [27:06] It was a great day. A lot of people [27:07] turned up and we gave away backpacks to [27:10] some school kids and it ended up being a [27:12] really great day. I would encourage it [27:14] if you have Greenway that you want to [27:16] either refresh or introduce. It's it's a [27:19] great way to to get people out and [27:21] understand what they're all about, [27:24] » Right? [27:24] » It was a lot of fun. And there was free [27:26] ice cream. So, [27:28] if you guys have free ice cream, [27:29] » We needed that now. [27:31] » Well, we paid for it now. [laughter] [27:36] » How's the traffic on uh the the water [27:39] greenways now? I I didn't look at the [27:40] latest statistics from the Yukon census, [27:43] but how is the traffic on there? [27:45] » Um, it's still not very busy and I [27:47] think, you know, I think it's sort of a [27:49] short section and I think people are [27:51] start it it has grown over the past [27:53] couple years. So, you know, I think more [27:55] and more people are are realizing that [27:56] it's there and I think once that [27:58] connection to downtown is made, I think [28:00] it's really going to really going to [28:02] bump up. [28:03] » There's some beautiful [28:04] » Too. I think Amazon going over there, [28:06] Aaron, too. I think it might make a [28:08] difference for use at least people to [28:09] enjoy the park over there. [28:11] » Yes. [28:12] » Yeah, it was well done. Very well done. [28:15] That was one of our field trips. [28:18] » Okay, let's let's move on. Any other [28:20] business or news? [28:25] We did install a couple of plaques on on [28:27] the Derby Greenway. Uh we have a project [28:30] in town for derby 350th and uh just [28:35] historic markers and two of them were [28:37] installed on the uhatonic side of the [28:40] greenway. One with the um the mural that [28:44] was painted earlier this year and the [28:45] other one was just the history of the [28:47] greenway itself. So, [28:50] » All right, [28:51] » Jack. I I know I've seen on Facebook [28:52] that I think you're leading um history [28:55] tours [28:56] » In in on the greenway. [28:58] » There's there's one going on right now [29:01] uh this summer. The um Derby Historical [29:05] Society and the Derby Neck Library have [29:07] organized a series of history talks. I I [29:11] did the first one and every Thursday, [29:14] even though this one is on Wednesday, [29:17] they have different speakers coming in [29:20] and talking about derby history while [29:23] people casually walk on the greenway. [29:26] The problem they've had is uh most of [29:29] the days have either been too hot or too [29:31] rainy. So, I think there have only been [29:33] two hell so far, but the one today [29:35] should be fine. So, it's another great [29:38] idea, great way to promote your uh, you [29:41] know, section of Greenway. I did one [29:43] couple years ago and it was too hot. I [29:46] had uh over 30 people [29:49] that came out. It was about 90 degrees. [29:51] So, we started with 30. I think we ended [29:53] up by the time we got back with 15. So, [29:56] got to worry about the heat when you do [29:58] it. But, it's a great idea. I I would [30:01] think others might incorporate some of [30:02] the history of the town on a ward like [30:05] that. pretty easy to do. [30:08] » Okay. Who's taking over now for the [30:10] Kenny Town Dam project? [30:12] » I guess that will be me. Um, so [30:15] [clears throat] [30:16] we've been talking a little bit about [30:17] this over the past several meetings, [30:19] several years. Um, but NBC is is leading [30:22] an effort to remove the Kennytown Dam. [30:25] Um, I have uh Paul Woodworth is is on [30:28] the line. Um, he's uh he's with Save the [30:31] Sound. I'll let Paul introduce himself. [30:35] Hey, good morning everybody. I'm Paul [30:37] Woodworth, senior director of the [30:38] ecological restoration team at Save the [30:40] Sound and uh our our project manager for [30:44] uh working closely with Aaron on the [30:46] Kenny Town Cam Removal Project. [30:50] So, we've talked a little bit about [30:51] this, but I think we're going to Paul [30:53] and I are going to go through some some [30:54] of the background and and why we're [30:56] doing this project and what the project [30:58] looks like. Um and then sort of the more [31:00] exciting part of this project for this [31:02] group is the you know the opportunities [31:05] it's it's presenting for continuing the [31:08] the Nagatuck River Greenway through you [31:10] know basically from downtown Ansonia to [31:12] downtown Seymour. Um so we'll we have [31:15] Stimson um who's a landscape architect [31:19] consultant on the line as well that will [31:23] take over uh toward the end of this [31:25] presentation and talk about those [31:26] opportunities and and present some some [31:29] concept plans as well. So uh we'll we'll [31:32] start it off here about you know talking [31:35] about the background of of Kennytown Dam [31:38] and the Ngatuck River. And I know a lot [31:39] of you know a lot of this so I'll go [31:41] I'll go kind of quickly through the the [31:42] history but Nagatuck River is the [31:44] largest tributary of the Husatonic. Um [31:46] before European settlement migratory [31:48] fish had free passage from Long Island [31:50] Sound through the Husatonic River to [31:52] miles of habitat in the Ngatuck and its [31:54] tributaries. Um, and you can see, you [31:57] know, evidence of that on the town of [31:59] Seymour Town Seal, um, where, you know, [32:03] from what I understand is is a really [32:05] important fishing place was right in [32:07] downtown where where Tinu Dam is now. [32:10] Um, but it just sort of hints at, you [32:12] know, the bounty of fish that that, you [32:15] know, were were in this river uh, [32:17] historically. [32:20] Um but the steep grade of the Nagatuck [32:22] and its tributaries provided really an [32:24] ideal source of of power for for early [32:27] sawmills and and grist mills. And then [32:30] later the river was damned extensively [32:32] to produce um produce tech textiles, [32:35] copper, brass and other industrial [32:37] products. Um really drove the economy of [32:40] the valley for for nearly two centuries. [32:44] But all that industry took a toll on the [32:45] river. All of you have heard stories or [32:48] may have seen seen the river at at its [32:50] worst. Um it really became one of the [32:53] most polluted rivers in the country. Um [32:56] it actually caught fire several times. [32:58] Uh this this example was from 1943, but [33:02] we found other historic uh mentions of [33:04] fires on the river um from all of that [33:08] that industrial waste that that was [33:10] being dumped into the river. [33:13] But we've really come a long way since [33:14] then. water quality has improved uh [33:18] thanks to environmental regulations, the [33:20] decline of some of those industries. Uh [33:21] the Nagto River has made a remarkable [33:23] comeback. Um fish, birds, uh wildlife [33:26] have have returned and so have people. [33:29] Um and communities are really starting [33:30] to embrace the river and I think, you [33:32] know, the Nagto River Greenway is really [33:34] a great example of of all the [33:36] communities sort of embracing the river [33:38] once again after, you know, turning [33:40] turning their backs on it for so long [33:42] because it was in such a bad state. [33:45] So in the 1990s uh the state recognized [33:48] the improvements that had been made on [33:50] the river and they started implementing [33:52] a plan to restore the Ngatuck River and [33:55] and and remove barriers to fish that [33:57] included move removing and bypassing [33:59] dams all along the Ngatuck and on [34:01] tributaries. Uh some of the more notable [34:04] examples on the screen here are the [34:07] Chase Brass Dam, the Anaconda Dam, um [34:10] and the Freight Street Dam, all in [34:12] Waterberry that were removed in the '9s. [34:14] The Plats Mill Dam and Unit City Dam in [34:16] Ngatuck also removed in the '9s. Um the [34:20] Tinu Dam bypass was opened in 2014 in [34:23] downtown Seymour and also in the '9s, a [34:27] fish ladder was installed at Kennytown [34:29] Dam. Uh but now we know that that fish [34:33] ladder was never really working very [34:35] well, has completely stopped working um [34:38] and was really pres preventing fish from [34:40] even reaching any of that restored [34:42] habitat. [34:48] So a little background about Kenny Town [34:49] Dam. It was built in the 1840s in [34:51] Seymour to divert water into a series of [34:54] canals that delivered it all the way [34:55] into downtown Ansonia where it powered [34:57] factories. Uh you can see the canal um [35:01] to the right of the screen on the right [35:03] hand side of the train tracks. Um [35:06] upstream of the dam is what we call [35:08] Kenny Town impoundment. Um and you can [35:10] see the the newer powerhouse uh to the [35:13] left along with the fish ladder that [35:15] that empties right right below the [35:17] powerhouse. [35:19] Um, so [35:22] there was a powerhouse built in Ansonia [35:25] in in the 1910s, we believe, um, that [35:30] really started the hydroelectric power [35:32] generation at the site. Um, in the [35:33] 1980s, the the powerhouse on the screen [35:36] here was built um, in Seymour uh, to [35:39] produce hydroelectric hydroelectric [35:41] power. At that time they started feeding [35:43] power into the grid and because of that [35:46] they had to get licensed by the Federal [35:48] Energy Regulatory Commission or FK. Uh [35:50] as a small hydro facility, FK issued it [35:53] a permit exemption in 1983. [35:56] Um exemption is sort of a misnomer. It [35:59] doesn't mean that it's exempt from [36:00] licensing. It's sort of a mini license. [36:02] Um but there are a bunch of um [36:04] requirements that that have to be met in [36:06] order to uh to keep that that um that [36:10] exemption uh active. So they have to [36:13] operate the powerhouses to generate [36:15] electricity. They have to maintain the [36:16] facility and when called upon um by FK [36:20] they had to provide fish passage at the [36:21] site which is why the fish ladder was [36:23] built in the 1990s. [36:29] So, we first learned that the fish [36:32] ladder was not working from Kevin Zach, [36:33] who I don't think is on the call now, [36:35] but is a member of this group. Um, Kevin [36:38] is a local environmentalist. He lives [36:41] right near the Ngatuck River and is [36:43] really passionate about the river. And [36:45] he'd noticed that migratory fish um [36:47] existed below the dam and had never seen [36:50] them above the dam even after the fish [36:52] ladder was was constructed. So, he spent [36:54] years documenting schools of fish below [36:56] the dam, dead and dying fish at the base [36:58] of the dam. He made really moving videos [37:00] that you can see on YouTube um and on [37:02] our website. And he shared his concerns [37:05] widely to environmental groups like Save [37:07] the Sound and to NBC staff um and also [37:11] to several of our chief elected [37:12] officials that are that sit on our our [37:15] NBC board. Um, and I think because of [37:19] Kevin's advocacy and and his passion [37:22] about this, a lot of our CEOs got really [37:24] passionate about it and they made it a [37:27] made it a a priority of our of Envy Cog [37:31] to to do something about this and to [37:33] look into it and figure out exactly what [37:34] was going on. So, in 2018, we started [37:38] working with Kevin and with Save the [37:40] Sound to investigate the issue. [37:46] Um, and I'll turn it over to Paul here [37:48] to to talk about about this slide and, [37:50] you know, what we found about the ladder [37:51] itself and and why it wasn't working. [37:55] » So, the [clears throat] ladder was [37:56] designed at the with the [37:57] state-of-the-art technology at the time. [37:59] Uh, was actually modeled after other [38:01] ladders uh built up north um and and in [38:05] some cases for different fish. Um, but [38:08] this hairpin turn you see here is one of [38:09] the structural deficiencies of it that [38:11] was a a major issue in deterring lots of [38:13] fish passage. Um but the other thing it [38:15] was meant to run at its best conditions [38:17] when hydroele electricity was being [38:19] generated and once the units started to [38:22] go offline that redirected the flow of [38:24] water in different areas and created [38:26] more distraction flow and less [38:28] attraction flow and so after we analyzed [38:31] a lot of the records that have been [38:32] collected by deep over about a two [38:34] decade period [38:36] we found that there was a really poulry [38:38] passage uh these are video records that [38:40] we were able to sort of uh distill down [38:42] into into spreadsheets eats and found [38:45] that it was like an average of 12 fish a [38:47] year or something like that. So really [38:48] pathetic passage. Uh and once once the [38:51] the dam went off power um it kind of [38:54] shut it down to to nearly zero. So um [38:57] without generating any power, this dam [38:59] was just basically sitting there uh no [39:01] longer serving any benefit to society [39:03] and and that's when we really started to [39:04] amp up the effort to um to pursue [39:07] removal. [39:10] And uh Erin, do you want to jump to the [39:12] next slide? and um and cover that or do [39:15] you want me to? [39:16] » No, I could I could speak to this one [39:18] and then I'll throw it back to you in a [39:19] minute. Um so, you know, we work to save [39:22] the sound and Kevin um and really try to [39:27] tried to explain to FK and to the the [39:30] fish and wildlife agencies that, you [39:33] know, fish passage was not happening [39:35] here. So, we really got got into this [39:38] project in the beginning trying to force [39:39] the owners at the time who initially was [39:42] NL um and then Hydroland [39:46] um really trying to get them to comply [39:48] with their with their license and to to [39:52] facilitate fish passage, real meaningful [39:54] fish passage at the site. Um so, you [39:58] know, we began petitioning FK. We were [40:00] very active on a on a on a docket that [40:02] FK has. Um, [40:07] and you know what we basically came to [40:10] realize was that uh ENL had no intention [40:13] on on fixing the fish passage issue and [40:16] then Hydroland who the the project was [40:18] sold to in in 2019 um also did not have [40:21] have any intent to do anything. Um [40:26] but we also started to learn about all [40:28] of these other downsides to the dam. Um, [40:31] it was no longer operational. Um, the [40:34] first the the older powerhouse went [40:36] offline in 2013. The new powerhouse went [40:39] offline in 20120. The facility is in [40:41] really poor condition. It's no longer [40:43] commercially viable as a hydro [40:44] generator. Uh, the owner was effectively [40:47] abandoning it. Um, and indicated to FK [40:50] that they did not have the ability to [40:51] make even minor repairs. Um, the [40:55] facility was just continuing to fall [40:56] further and further into disrepair. And [40:59] despite providing no benefit, Kenny Town [41:01] Dam was continuing to cause huge [41:03] negative impacts beyond blocking fish [41:05] passage. Um it was increasing flood [41:07] risk. It was negatively impacting water [41:10] quality. Um it really became clear to us [41:12] that and to our partners that dam [41:15] removal was really the only way to [41:16] permanently address all of those [41:17] negative impacts. Um and at the same [41:20] time, Hydroland was actually shopping it [41:22] around to other hydro providers. Um and [41:26] there were no takers. I think everybody [41:27] saw that, you know, there was no way to [41:29] generate electricity here in a in an [41:31] economically viable way. [41:34] Um, [41:38] so [41:40] with all those negatives, you know, [41:41] removing the dam is going to fix a lot [41:43] of them and and provide a lot of [41:45] benefit. Paul, [41:46] » Yeah. So, [clears throat] one of the one [41:49] of the big selling points for this [41:50] project and and attractive points for [41:52] this for for save the sound is that a [41:55] removal of this would restore about 30 [41:56] miles or access to about 30 miles of [42:00] river habitat for American shad ale wife [42:02] and blue back herring and deep had done [42:05] their own analysis. deep fisheries. Um [42:07] once they realized the dam was no longer [42:09] viable, uh they updated their um their [42:12] plan to restore diademous fish is to [42:15] migratory fish to the Nagatuk River [42:16] water. So they basically concluded with [42:18] removal as the best option. They [42:20] [clears throat] used their own metrics [42:21] for calculating what kind of population [42:23] impacts that could have and judging by [42:26] these miles and and uh acreage of of [42:28] river access. They're anticipating a [42:30] population. It could sustain a [42:32] population about 20,000 American shad, [42:34] 140,000 uh river herring. So these are [42:37] numbers that are kind of off the charts [42:38] for dam removals in Connecticut. We are [42:40] very damn dense and so when you remove [42:42] one dam, you often provide access up to, [42:44] you know, another mile or so, but 30 [42:46] miles is pretty substantial. And then [42:48] another 30 or so miles for tributary [42:51] habitat. So 70 70 70 or so miles for sea [42:54] lamp and American eel which are able to [42:56] to navigate up the steeper tribes that [42:58] drain down into the Ngatuck. So uh and [43:01] they estimated a population of about [43:03] 6,000 sea lampray. So like really big [43:05] numbers for dam for a single project in [43:08] Connecticut. And uh so that was a huge [43:10] selling point for us and and one of the [43:12] reasons why we sought funding from Noah [43:15] uh which provided our first uh sort of [43:17] purse of of of funding at about 15 uh [43:21] million or so. Uh some of which has been [43:24] uh since uh sort of frozen by the Trump [43:27] administration, but uh essentially is [43:28] still uh is still supplying a lot of our [43:31] uh design work, including some of that [43:33] work um uh that uh we're presenting [43:36] today. So Aaron, you can move ahead. And [43:38] so in addition to the fish passage, [43:40] there are a myriad of other [43:41] environmental benefits, capitalizing on [43:44] the benefits of the upstream removals [43:46] that uh Aaron had mentioned, the tank [43:49] bypass, for example. Also reducing flood [43:52] risk in the community that lives [43:54] immediately upstream of the dam. This [43:55] would drop water surface elevations at a [43:58] at normal flows and and uh for some of [44:00] the more uh frequent and uh nuisance [44:03] flood levels. It also helps to address [44:05] some of the health and safety concerns [44:07] that have emerged with the uh with the [44:10] abandoned um canal that's accumulated a [44:13] lot of debris and contaminated sediment. [44:15] Uh we're hoping to restore access to the [44:17] Nagguk River with uh with footpaths and [44:20] act utilizing some of the bridges that [44:22] exist there now under the rail line to [44:23] get people out to the shores of it. And [44:25] then of course we're trying to connect [44:28] uh the greenway from Ansonia to Seymour. [44:31] All of which we anticipate will improve [44:32] sport fishing opportunities and restore [44:34] natural sediment flows through the river [44:36] valley uh which helps sustain our [44:38] coastal areas as well. So um lots to be [44:42] gained from from most dam removals and [44:44] and even more to be gained from from [44:46] this particular project. [44:50] So because of all those benefits, you [44:52] know, we really made a priority to to [44:53] try to do something about this and the [44:55] plan sort of aligned in in 2022 [44:58] when funding became available through [45:00] Noah. that Paul just just mentioned and [45:03] Envy Cog um spearheaded an effort to to [45:07] put an application in with with Save the [45:09] Sounds Assistance um for funding to [45:12] design the dam removal. Um [45:16] we had support from the dam owners at [45:18] that point uh who realized, you know, [45:20] there there was no, you know, it was not [45:21] e they weren't going to be able to find [45:23] a buyer for it. So this was this is sort [45:24] of their easy way out of this this [45:26] problem that they had. Um, we had [45:28] support from the governor, from from the [45:30] federal delegation, from all of the the [45:33] uh resource agencies, [45:35] and we were fortunate enough to receive [45:37] uh $15 million to begin the Candy Town [45:40] Dam Removal Project. Just an overview of [45:43] the project. Um, you know, the plan and [45:46] and we have since uh acquired the [45:48] facility through the Connecticut [45:49] Brownfield Land Bank. um that initial [45:52] funding was the you know was going to [45:55] fund all of the engineering design of [45:57] the removal. Uh [46:00] sort of an added complication to this [46:02] project is that Seymour has two sewer [46:04] siphons that are situated in sediment [46:07] above the dam. Um and those have to be [46:10] moved um before we can remove the dam. [46:14] So as a separate project which is in [46:16] itself a big complicated project uh we [46:19] are NBCOG is taking that work on um with [46:22] some federal funding that we've received [46:24] um to do we're doing that design right [46:26] now. Um [46:29] there's a lot of impounded sediments [46:31] we'll talk about a little bit about that [46:32] uh in a minute that that have to be [46:34] dealt with. We're going to decommission [46:37] the dam through FK and ultimately remove [46:39] it restore the river channel. [46:42] all this time protect the railroad and [46:44] route 8 which are adjacent to the [46:46] empoundment um develop recreational [46:49] access and extended the NRG trail and [46:52] engage stakeholders and residents [46:54] throughout. So that's what the project [46:56] looks like. [46:59] It's being funded through a bunch of [47:01] different sources uh that initial $15 [47:03] million from Noah. We have funding [47:05] through Connecticut Deep. Uh we have EPA [47:08] funding in uh and and assistance in [47:11] dealing with the sediments. Um DECD has [47:14] has provided funding. Uh for this group [47:17] though, we we received $270,000 [47:20] um two years ago now through the Deep [47:22] Wreck Trails program to design the trail [47:25] as part of this design project. Um so [47:29] total right now we have about $53 [47:31] million um committed to the project. As [47:35] Paul alluded to, the federal government [47:37] is is not releasing some of that Noah [47:41] funding that that we were promised and [47:43] that we have a contract for. So, you [47:45] know, we likely won't receive some of [47:47] that funding, but we are always working [47:49] on, you know, trying to find new funding [47:51] to backfill that and to to fund the rest [47:53] of the project that we know is going to [47:55] cost more than $53 million. [47:58] Um [48:00] our provisional timeline at this point [48:02] um you know we are working through a [48:05] sediment management plan right now. Um [48:07] the design is continuing through this [48:09] year. We're planning to hire a uh [48:12] construction contractor early at at the [48:14] 60% design phase so that they can have [48:17] some say in in some of the the details [48:20] about how we're going to do the the dam [48:21] removal. [48:23] Um we're hoping to to finish the sewer [48:26] siphon design this year. Um and then 27 [48:29] and 28 sediment management probably [48:31] construction starting on the the sewer [48:34] project at least. Um and then hopefully [48:38] if everything goes right possibly 2029 [48:40] we'll be enjoying a restored Nagatuck [48:43] River. [48:46] Um, and just for everybody to sort of [48:48] get a understanding of of what the site [48:51] looks like right now and and some of the [48:53] some of the issues that we're dealing [48:54] with that will lead to a condition where [48:57] we'll be able to put a trail. Um, this [48:59] is what the site looks like right now. [49:01] Um, at the center of the screen is [49:03] Kennytown Dam. Uh, to the west of it is [49:06] what we're calling Kennytown [49:07] empoundment. That's the still water [49:09] that's backed up behind the dam. Um, you [49:12] can see um on [49:16] Let's see if I can get a laser pointer [49:18] here. Um, [49:20] » At one point we could see your mouse. [49:22] » Oh, okay. Well, here's Can you see my [49:24] laser point? [49:24] » Yeah, I can see that. Yeah. [49:26] » So, um, this is the entrance to the [49:29] canal. The canal runs all the way down [49:31] on on the east side of the the train [49:35] tracks all the way into Cove Pond. Um, [49:38] and then the canal actually continues. [49:40] The the second powerhouse in Ansonia is [49:42] is located here. [49:44] Um you can see, you know, north of the [49:47] dam, it's really constrained by Route 8 [49:50] and the railroad. Um south of the dam [49:54] there, you still have we still have a [49:55] railroad to deal with the canal. Um so, [50:00] you know, because of all of these [50:01] constraints, because this was all [50:03] federally regulated property, this was [50:06] always a big question mark on the NRG uh [50:08] root map. Um, [50:11] but because of what we're doing here, [50:13] um, you know, there's there's really a [50:16] lot of new opportunities that are [50:17] presenting themselves. [50:19] Um, and I think it's important to [50:25] sort of understand um, [50:28] some a little bit about the sediment [50:31] management. Paul, I don't know if you [50:32] want to run quickly through through the [50:34] sediment management and and some of the [50:35] concepts that that GI's come up with. [50:37] And I think that will really inform what [50:40] what uh Stimson will be speaking about [50:42] in a minute. [50:42] » Sure. I I'll do a really high level [50:44] overview. I mean, we have we have many [50:46] hundreds we have over nearly 800,000 [50:50] cubic yards of sediment to deal with [50:52] here. Um [50:54] fortunately for us, 350,000 of that is [50:58] surficial sand and gravel that is um not [51:01] in elevated in concentrations above [51:04] background conditions. So, we have a [51:06] little bit more freedom in how we can [51:07] deal with that. But what lies below is [51:10] another 300 300,000 cubic yards of [51:14] sediment that is elevated in PCBs and [51:16] copper um among others. And so, that's [51:19] going to need to be excavated and uh and [51:22] moved uh down into Cove Pond. So, it's a [51:24] it's a very costly operation. Um so, in [51:27] addition to the infrastructure [51:28] constraints, the sediment is the other [51:30] sort of big complicating factor on this [51:32] project. Um, and I I guess I can leave [51:36] it at that. We're we're working through [51:37] a very complicated or complex [51:40] uh sediment management plan to to deal [51:42] with those large volumes. [51:44] » Fortunately for us, this has also been [51:46] looped into the brownfield program uh [51:48] through Envy Cog and and EPA has been [51:50] the one leading the effort in assessing [51:52] the sampling and assessing the sediment. [51:55] uh so they've gone through uh an initial [51:57] round that identified and sort of [51:59] initially quantified and then a [52:00] supplemental round that helped us uh [52:03] stratify it or delineate it more [52:04] vertically so that we could identify [52:06] layers that could be handled and managed [52:08] differently. So that's um that's still [52:10] going and now we actually are embarking [52:12] I think in September early September on [52:15] a on a what we what should be a third [52:17] and hopefully final round of sampling [52:19] looking at uh toxicity assays. Uh so if [52:22] we if we are uh proposing to release [52:25] some of that surficial sediment, we're [52:27] running toxicity tests to make sure that [52:29] there wouldn't be any adverse ecological [52:31] impacts to uh ecological receptors [52:33] downstream or like stream biota [52:35] basically. So um so that's still [52:38] underway. Aaron, do you want to add [52:39] anything to this [52:41] » Comment? [52:42] No, I I you know I think [52:45] you know a lot all of that sediment is [52:47] going to have to be dealt with or or [52:49] moved um or a lot of that the dirty [52:52] sediment at least. Um so GI's come up [52:54] with these concepts of of how that can [52:56] be done. Um we know that the you know [52:58] once the dam is gone the river is going [53:01] to try to find its original course. Um, [53:05] so there's going to be quite a bit of [53:07] new land um made available on either [53:10] side of of where that course ends up [53:12] being. Um, [53:19] and the idea now is to move a lot of [53:21] that dirty sediment into Cop, which has [53:23] its own very dirty sediment, actually [53:25] dirtier than uh what's what's upstream. [53:28] Um, so Cop is is no longer going to be a [53:31] pond in the long term. It's probably [53:33] going to be full of of sediment from [53:35] behind [53:37] um [53:39] behind Kenny Town Dam. If you want to [53:41] talk a little bit more about that, Paul, [53:43] but I think Simpson is going to talk [53:44] about, you know, what what could be done [53:47] with with a lot of this reclaimed land. [53:50] » Yeah. Uh I just add that Copound was [53:52] basically created by the canal system [53:54] that feeds Ansonia. Uh so it's a [53:57] man-made dam. Uh it's been I've been [53:59] it's been appreciated by the neighbors [54:01] that live above it. um kind of not so [54:04] appreciated by the neighbors that live [54:05] on the downstream end of it. Uh but it [54:07] does, as Aaron said, it's been a [54:09] receptor of the finest grain sediment [54:10] that's been floating down river for [54:12] decades. And so it has the highest [54:14] contaminant levels of all the [54:15] contaminants found in in our sediment. [54:18] So we have a strong impetus to take it [54:20] out of the aquatic setting basically by [54:22] dewatering it and ultimately capping it [54:25] with uh first sediment from behind town [54:27] and then ultimately some sort of a clean [54:29] cover uh clean fill on top of it so that [54:32] this could be a usable space uh when [54:35] we're done. [54:39] And then I'll just set the stage for [54:40] Stimson here. Like I said, we we [54:42] received the Deep Breck Trails grant. [54:45] Um, and the scope of that was to fully [54:47] design the Ngatuck River Greenway Trail [54:49] on the Kennytown Dam property. Um, [54:52] basically from the pump station on Derby [54:54] Derby Avenue in Seymour to the fourth to [54:57] fourth street in Ansonia. Um, and also [54:59] look at conceptual routing to connect [55:01] the Nagatuck River Greenway sections to [55:03] the north and to the south. Um, and what [55:06] we did was wrap up the wreck trails [55:09] scope into the overall dam removal [55:12] design scope so that, you know, we could [55:14] take advantage of all of the work, all [55:16] of the data collection that was already [55:18] being done and so that, you know, the [55:20] designers on the trail and the designers [55:21] on the dam removal were working, you [55:23] know, handinand on, you know, what this [55:25] property is going to look like after the [55:26] dam is removed. Um, so I will stop [55:31] sharing there. Um, and I'll introduce [55:36] Well, let me stop sharing. Okay. [55:39] And I'll introduce [55:42] I saw Glenn Valentine, Emily Hayes, and [55:45] Michael Linquist from Stimson. Um, [55:51] who are the designers, the the [55:53] subconsultants um designing the the [55:55] trail. [55:58] » Okay. Thanks, Aaron. Um, so you just got [56:03] a lot of good background information [56:05] that we've been dealing with um and sort [56:07] of analyzing and thinking about for the [56:09] past six months as we've thought about [56:13] different options for how to um engage [56:18] the realigned river and where the new [56:21] trail alignment might go. And this [56:24] morning we're going to talk about four [56:26] different trail alignments or three [56:28] really three. one is a with a subset [56:30] that Emily's going to share with you in [56:32] just a minute and then we're going to [56:34] share some very preliminary [56:37] um ideas about what the final shape of [56:41] of Copond might look like and um those [56:45] are really just thought exercises about [56:47] some of the opportunities that we might [56:48] have just through shaping the land um [56:52] that goes of all that sediment that's [56:54] going to go into Copan that Paul was [56:57] talking about just a few minutes ago. [56:59] But I think we'll just jump right in and [57:01] talk about uh the different alignments [57:04] that we're looking at for the uh for the [57:07] trail along the the uh embankments and [57:11] in various relationships really you'll [57:13] see to the realigned river. [57:17] » Go ahead Emily. [57:18] » Great. Perfect. Can you all see my [57:20] screen? [57:21] » Okay, perfect. Great. Um yeah, great [57:24] introduction that really set us up to [57:26] describe what we're going to get into [57:28] today. Um yeah, big overview, but it's [57:31] important for us to consider the [57:33] industrial history of the river, where [57:35] the river fits into the larger water [57:37] story of the region. um the existing [57:40] ecologies and access um by community [57:43] members to the river and the kind of [57:45] barriers that exist both phys physically [57:47] and visually um which have led to some [57:50] design objectives that have kind of [57:51] guided us which is to celebrate the [57:53] industrial heritage of the site to [57:55] improve water quality and management as [57:58] best as we can to foster a vibrant [58:00] living river and ultimately you know to [58:02] connect to the existing energy trail and [58:04] imagine what Cop will look like um [58:06] moving forward. [58:08] So, right, this is a large site. We have [58:11] Copond down here and then the trail. [58:13] We're kind of breaking it up into two [58:15] sections here. So, I'll talk about the [58:17] trail. Glenn's going to talk more about [58:18] Copond. Um, but we're connecting from [58:22] North uh Fourth Street, which is down [58:24] here, up to the existing bike path at [58:26] Tinu Dam. Um, what I'm going to fly [58:30] through is going to talk about basically [58:32] right at the former Kenny Town Dam site [58:34] up to Seymour. [58:37] So it yeah there's a lot of pressure and [58:39] there's a lot of complications in this [58:41] but um the first option that we've come [58:44] up with is what we're calling the rail [58:46] adjacent trail and it's we kind of move [58:49] up towards Seymour from the dam. We [58:52] would uh first not cross the river at [58:55] the dam. This option would stay along [58:57] the east side of the river and it would [58:59] hug along the east side of the rail line [59:02] and then ultimately it would tie into [59:04] the sidewalk and the parking lot up at [59:06] Tenu Dam and Seymour. Um, this would [59:10] it's there are pros and cons to all of [59:12] these. Um, it would be simple and [59:14] consistent, but it would um have [59:16] obstructed river views and limited river [59:18] access. It would tie into town [59:21] infrastructure and parking, but there [59:22] would be no Derby A connection on this [59:24] side of the river. It might be the least [59:26] technically difficult, but it also is [59:28] the least flexible. Um, [59:31] » Emily, I would just go back just for a [59:33] second. It was hard for me to I just [59:36] want to make sure people on the call [59:37] because there's so many people probably [59:38] on a lot of different kind of devices. [59:41] Can you just point out where the trail [59:43] what's the trail is that light green [59:45] line along the north side? Just you can [59:48] point that out. I don't know if people [59:49] can see your [59:51] » Uh mouse or not. [59:52] » Right. And this is such a big site. Um [59:54] you know, we're trying to fit a lot of [59:55] information on on this graphic, but the [59:57] trail here would would start down here [59:59] and it would just continue along here [1:00:01] kind of nestled between the existing [1:00:03] rail line and the community um up above. [1:00:07] So, it's a pretty tight area and there's [1:00:09] a lot of grade change between where the [1:00:11] rail line is now and kind of where the [1:00:13] community is up here. which would mean [1:00:16] that if we look at it in in section it's [1:00:18] a pretty tight um [1:00:20] » Sorry sorry could we go back one more [1:00:22] just for a second yeah in this scheme [1:00:24] you know there the only real river [1:00:26] access is under the train tracks if you [1:00:29] could just point out there's currently [1:00:31] an underpass under the rails so so when [1:00:34] you know Emily mentioned limited river [1:00:36] access it really is kind of only that [1:00:39] point um so that's a real you know uh [1:00:42] downside to this particular scheme [1:00:45] Yeah. [1:00:49] Um, looking at it in section, I think we [1:00:52] can better feel what it would what it [1:00:54] would be like. Uh, this would assume [1:00:57] this obviously is a really long stretch [1:00:59] and the the conditions would vary a [1:01:02] little bit, but typically it would be a [1:01:05] ideally a 25 ft offset from the center [1:01:08] line of the rail, which would that would [1:01:10] begin our trail. Um, it would feel [1:01:12] pretty tight. there would be a fence [1:01:14] there. Uh we've got a pretty steep slope [1:01:16] that goes up towards the the [1:01:18] neighborhood and then [1:01:21] a decent amount of flood plane here [1:01:22] before the actual river. So it would [1:01:25] feel a little bit disconnected. Um and [1:01:27] it would be a little a little tight. Um [1:01:31] but this would be one option that we [1:01:33] thought was worth just kind of [1:01:34] considering. [1:01:38] Our second option would continue along [1:01:41] the east side, but it would dip to the [1:01:43] west side of the rail. So, this would [1:01:46] cross um at the former Kenny Town um dam [1:01:52] site. It would kind of sneak under the [1:01:53] the bridge that already exists there. [1:01:56] And this would bring us out to um the [1:01:59] west side of the rail. It would not [1:02:02] cross at the dam, but it would hug along [1:02:04] this side. um it would take advantage of [1:02:07] some of the existing topography [1:02:10] um while dipping into the flood plane. [1:02:12] There'd be a kind of um [1:02:16] an elevated or an out of the flood plane [1:02:19] part of the trail and then some [1:02:20] opportunities for some um more informal [1:02:23] and secondary circulation paths that [1:02:25] would come into the flood plane. In this [1:02:27] option, we're proposing uh the potential [1:02:30] for a crossing at a new build bridge, a [1:02:33] crossing at Derby AB that would bring us [1:02:35] into the street traffic of of Derby AB [1:02:37] in Seymour. Um [1:02:40] and this uh yeah would take advantage of [1:02:43] some of the repairarian edge, but it [1:02:44] would still be a negotiation with the [1:02:46] rail line. Um, and it would avoid kind [1:02:49] of what it would be like to cross at the [1:02:52] old dam, but it also means that it would [1:02:55] add another level of complexity in the [1:02:57] introduction of a new build bridge. Um, [1:03:00] something else I think maybe to consider [1:03:01] is that there might be limited [1:03:03] construction and emergency vehicle [1:03:04] access along this path if there's no way [1:03:08] to cross the rail line. Um, basically [1:03:11] once we are on one side of the rail line [1:03:13] at this point, that's kind of where we [1:03:15] have to stay. there's not going to [1:03:16] really be a chance to cross over it um [1:03:18] once once we kind of start moving along. [1:03:21] » Emily, I'll I'll just add that, you [1:03:23] know, in this this alignment of the [1:03:26] trail, we're imagining going right down [1:03:28] Derby AB. Um so there'd be quite a bit [1:03:31] of um uh design work needed to make sure [1:03:34] there's room along that roadway with all [1:03:37] the adjacent buildings and businesses um [1:03:40] through that community. But it does [1:03:42] provide the opportunity for a lot of [1:03:44] direct engagement with the community [1:03:46] which we are excited about. [1:03:51] » Yeah. And and I think looking at it in [1:03:53] section it it definitely feels a little [1:03:55] bit less claustrophobic than the first [1:03:57] option. Um it's still potentially quite [1:04:01] close to the rail, but it would give us [1:04:03] a bit more breathing room. there's a a [1:04:04] potential to consider what uh this kind [1:04:07] of embankment might look like and what [1:04:09] how as as the river realignment [1:04:12] continues what kind of stabilization [1:04:14] needs to happen to make that possible [1:04:16] but there's also we can see [1:04:17] opportunities to come down actually into [1:04:19] the flood plane um this would be dynamic [1:04:22] it would it would mean that in flood [1:04:23] events this might be covered but that is [1:04:26] something that you know I think would [1:04:28] pose its own set of complications but is [1:04:31] exciting and is dynamic it's an [1:04:32] opportunity to invite people down and to [1:04:36] I don't know educate about what flooding [1:04:39] can be, what riparian edges are. Um it's [1:04:42] an exciting opportunity I think and um [1:04:45] it would it would be a way to kind of [1:04:47] take advantage of all of this space that [1:04:48] we have. [1:04:52] And then our third option, we're kind of [1:04:54] breaking into a part A and a part B. For [1:04:56] the first um section, it's the same and [1:05:00] then it changes as we get over into [1:05:01] Derby A. this uh option would cross at [1:05:06] the former dam. We thought that'd be an [1:05:09] exciting way to kind of celebrate the [1:05:11] history of the dam there. It's such a [1:05:13] big project to remove and it's kind of [1:05:15] like instead of fully erasing it. Is [1:05:17] there a way to kind of bring people out [1:05:19] and to experience kind of what it what [1:05:21] the dam was like, where it was, what the [1:05:24] views were, um and the change that it's [1:05:26] had as it's been removed. So this would [1:05:28] cross at the former dam and this option [1:05:31] would kind of hug along Route 8 on the [1:05:34] east side. And [snorts] similar to the [1:05:36] previous one, it would like be a kind of [1:05:38] a formal trail above the flood plane, [1:05:40] but there'd be opportunities to weave in [1:05:42] and bring down get water access um in a [1:05:45] more informal way. And then uh so for [1:05:49] our 3A option, we were just exploring [1:05:53] what it would be like to instead of um [1:05:56] like the previous option, tie into the [1:05:58] street traffic of of Derby A, what it [1:06:01] would be like to continue to hug along [1:06:04] the river's edge. Um which is, you know, [1:06:07] an exciting option, obviously a [1:06:09] complicated one. We know that there's a [1:06:11] community center and a senior center [1:06:12] over here. There's a cemetery. There's a [1:06:14] a decent amount of kind of public facing [1:06:19] properties on this um on this stretch [1:06:22] that might be something that we could [1:06:25] tie into and feels like a kind of [1:06:27] natural way to to continue on this kind [1:06:30] of public greenway trail. But it also [1:06:33] there's a lot of private properties and [1:06:34] we don't really know is a complicated [1:06:36] thing to to require easements for access [1:06:39] to the river's edge. But um we thought [1:06:41] it was worth kind of exploring and [1:06:42] putting out there um as a as an option [1:06:45] and as a potential trail condition. [1:06:48] Um this would allow for more water [1:06:51] access and unobstructed views. Um [1:06:53] there's of course just the general risk [1:06:55] and management of flood plane [1:06:57] navigation. It would highlight the [1:06:59] history of the dam and the historic [1:07:01] structures down here. Um but there's [1:07:03] also obviously a complexity in what that [1:07:06] process would be like. Um, and it does [1:07:08] avoid the traffic of Derby of Derby A, [1:07:12] but it also would require easements for [1:07:14] for getting out on on the river's edge. [1:07:19] Um, and then the 3B option would be [1:07:23] instead of tying into keeping along that [1:07:25] edge to then just tie into the traffic [1:07:27] like the previous option, which again [1:07:29] would be a complicated thing considering [1:07:31] that the off-ramp from Route 8 and this [1:07:34] kind of speed, but I think it's [1:07:35] something that the community members [1:07:36] here are interested in because it is [1:07:38] such a high traffic, high volume um, [1:07:40] street. Something to kind of make that [1:07:42] more accessible is is ideal. [1:07:46] Um, this would feel not dissimilar from [1:07:49] the previous option, but just along the [1:07:50] other side, there's more space and [1:07:52] buffer between Route 8 and the primary [1:07:54] trail, but again, chances to come down [1:07:56] in, potential for armoring and [1:07:58] stabilization of that um embankment, and [1:08:01] then opportunities to come in and [1:08:03] experience uh flood plane and [1:08:05] riverfront. [1:08:07] » I I guess I would add, Emily, um here we [1:08:10] don't have the complication of the train [1:08:11] to deal with. Obviously we have route 8 [1:08:13] vehicular traffic to deal with which is [1:08:16] has its own set of challenges but uh we [1:08:18] don't have the the train and all the [1:08:21] negotiation that will be required to get [1:08:23] permission from them. [1:08:25] » Exactly. [1:08:30] » So these are kind of all of them [1:08:31] overlaid and maybe as we begin our [1:08:33] discussion or answer any questions we [1:08:35] can come back to this slide but these [1:08:36] are they're just you know different [1:08:38] versions of of how we can get from here [1:08:40] to there. [1:08:45] Glenn, do you want to [1:08:46] » Yeah, [1:08:46] » Take it over. [1:08:48] » Yeah, go ahead. [1:08:49] » So, we're going to move to the second [1:08:51] part of our our study area, which is Cop [1:08:54] Pond. And that I'll just quickly say, [1:08:58] you know, that green area. Uh well, this [1:09:02] is this is too small that there's [1:09:03] there's only one alignment we're really [1:09:05] considering for the bike trail along [1:09:07] here and it's it's um up on essentially [1:09:11] the uh the dyke or the um embankment [1:09:15] that's holding in Copan right now. So, [1:09:17] we're not going to talk too much about [1:09:19] that alignment. it shows up on on some [1:09:22] of these preliminary sketches, but [1:09:24] that's that's the the through line that [1:09:26] we're considering and it's going to [1:09:28] occupy um the canal to the west, which [1:09:33] were shown in some of the images that [1:09:35] Aaron was showing before. We're [1:09:36] imagining that all being filled in uh [1:09:39] that Copan will no longer have uh a [1:09:42] running river through it that it will [1:09:44] just be fed by storm water and that that [1:09:47] canal will be the connecting part of the [1:09:49] trail and then run along the dyke [1:09:52] close to but sometimes parallel or up [1:09:55] above the train tracks along Cop. So, [1:09:57] we'll jump to a couple very uh [1:09:59] preliminary sketches about what some of [1:10:03] the opportunities are as we re-imagine [1:10:06] Copond. Um, as mentioned, there's around [1:10:11] 300,000 cubic yards of material to go [1:10:14] into [1:10:16] uh Cop to manage the sediment. And the [1:10:20] way GEI was initially looking at it, [1:10:22] that would raise the level of the [1:10:25] landform about 10 ft above the area [1:10:28] about of the level of the existing water [1:10:31] level now in Copond. So that's if you [1:10:34] spread it out pretty evenly with gentle [1:10:36] pitches around 3%. So we quickly looked [1:10:39] at what are some of the opportunities [1:10:41] that might come out of just how we shape [1:10:43] that land uh that we're going to be [1:10:45] working with as we reimagine this space. [1:10:49] So um [1:10:52] the um [1:10:54] the this first this first idea here is [1:10:57] really to create a series of terraces [1:10:59] and consider the option of active [1:11:02] recreation for the space. And I'll I'll [1:11:05] say right at the beginning, we we [1:11:07] haven't talked to uh adjacent [1:11:09] communities about the programming and we [1:11:11] realize there's a lot of requirements [1:11:14] for managing a park, for paying for a [1:11:16] park, for programming a park. But we [1:11:18] just want to put it out there that one [1:11:20] opportunity because we have so much fill [1:11:23] is to create these kind of level [1:11:24] platforms which could contain future [1:11:27] programming for a park. So, here we're [1:11:30] talking about potentially two [1:11:32] playfields, maybe soccer fields. We're [1:11:35] thinking maybe there's a a public pool [1:11:37] in the space and and maybe there's um [1:11:41] kind of environmental playground or [1:11:43] nature playground in this space and [1:11:45] maybe there could be um picnic pavilions [1:11:49] that could be rented around the [1:11:51] periphery of of this space to really [1:11:54] give it opportunities for active [1:11:57] engagement, recreation from all [1:11:59] different [1:12:01] types of population, from the community. [1:12:03] That's really what we are thinking [1:12:04] about. And in this option, we're [1:12:06] imagining a road would be part of this [1:12:09] for people to get to the new park space [1:12:13] for people to engage with the games [1:12:15] being played on the fields. So it come [1:12:17] in at North Fourth Street connecting [1:12:20] into the city grid and runs through the [1:12:23] space wrapping around to the north and [1:12:27] uh servicing all of these new uh program [1:12:30] items that we're talking about from you [1:12:32] know playfields to swimming potentially. [1:12:35] One other consideration which you saw in [1:12:38] the diagram that Paul showed earlier is [1:12:40] there is an intermittent stream which [1:12:42] comes through the site. So we're [1:12:43] thinking about how that could be part of [1:12:45] the experience. Here we have it running [1:12:47] along the north edge of the park along [1:12:49] that entry drive and we really want that [1:12:52] to be quite prominent and build some [1:12:54] constructed wetlands to help cleanse [1:12:56] that water before it makes it back to um [1:13:00] the river itself. So this is this is our [1:13:02] our first option and this would raise [1:13:05] the level up um maybe about um 10 feet [1:13:11] or or 15 ft above what the the level of [1:13:14] the water is now. So similar kind of [1:13:17] spreading out of the sediment but [1:13:20] imagining it in just a different way as [1:13:23] terraces. That image on the right is [1:13:26] actually Danahe Park here in Cambridge, [1:13:27] Massachusetts. That's a park that was [1:13:30] built on landfill about 20 years ago. [1:13:32] So, we were kind of inspired by that [1:13:34] because it has a lot of active [1:13:36] recreation, but it's very surrounded and [1:13:38] embraced by trees which have grown up in [1:13:41] the park since it was u built. Next [1:13:44] option. [1:13:47] The next option we're calling the mound. [1:13:49] And this you'll see has a more u passive [1:13:54] recreational program. It's still pretty [1:13:56] active in in terms of allowing people [1:13:59] into the park. And in this option, we're [1:14:01] imagining the sediment is brought into [1:14:04] the center in one area and maybe it it [1:14:07] comes up to height of maybe 30 ft above [1:14:11] the existing level of Copond right now. [1:14:14] So you get views up and over the bike [1:14:17] trail. You get views of the realigned [1:14:19] river and surrounding kind of wetlands [1:14:22] that we're imagining. You can see this [1:14:24] scheme also has a loop road which comes [1:14:27] in and wraps around the base of this new [1:14:30] mound. We're imagining some kind of [1:14:32] active program here. are showing a pool [1:14:34] that could be a field or some other kind [1:14:36] of active wreck, but really inviting the [1:14:39] community into this space. And then [1:14:41] access up to that 30- foot high mound [1:14:44] would be via kind of spiraling pathway, [1:14:46] which would take you gradually up to the [1:14:48] top on an ADA path where you'd have an [1:14:52] overlook pavilion. And here you might [1:14:54] have a couple other uh small overlook [1:14:56] pavilions as well. [1:14:58] Here we've imagined the intermittent [1:15:00] stream coming in running to the south [1:15:02] instead of to the north and running down [1:15:06] and going along the edge of the new bike [1:15:09] trail through the space and really [1:15:11] highlighting an area of constructed [1:15:14] wetlands along that trail. So that your [1:15:16] passage along the trail here would be [1:15:19] educational and informed with uh ways of [1:15:22] treating storm water through the site. [1:15:25] The image in the upper right is Ferris [1:15:27] Park up in Lawrence, Massachusetts. [1:15:29] That's a park we built about 10 years [1:15:32] ago. And that was built that has a [1:15:34] central mound in the middle that gives [1:15:37] um views to the surrounding river and [1:15:40] historic uh buildings around the site. [1:15:43] That was built on a mound of slag which [1:15:46] was left over from the uh foundry [1:15:49] operations 100 years ago and then capped [1:15:52] with uh 2 ft of soil. So we we know [1:15:55] that's going to be part of this program [1:15:56] no matter what we do. A capping of this [1:15:58] material as Paul mentioned this is going [1:16:00] to have to be uh carefully managed. So [1:16:02] we're we're looking to parks that that [1:16:04] do the same thing like Danahe or Ferris [1:16:06] Park for inspiration. [1:16:09] And the third option is [1:16:12] uh there it's progressively less active. [1:16:15] So this is sort of the most passive [1:16:17] approach that we're imagining and we're [1:16:19] calling this one the islands. And here [1:16:21] we're imagining that sentiment mounded [1:16:23] up into maybe 20 foot high kind of [1:16:27] landforms throughout the space. Uh five [1:16:30] or six mounds that you would navigate [1:16:32] around in this reimagining of the space. [1:16:35] And here that intermittent stream [1:16:37] meanders between the new landforms to [1:16:40] the north and then back south and to the [1:16:42] north. And that really is the primary [1:16:44] driver of program in this. And the [1:16:47] program here is really just one of [1:16:48] trails. And we'd have a trail system [1:16:51] that um takes you through this space and [1:16:54] up to the top of each one of these [1:16:56] mounds. You can see on the right kind of [1:16:58] council ring inspired by uh Jensen [1:17:01] Jensen from the Midwest. But it's an [1:17:03] idea of just getting into nature and [1:17:05] seeing nature and and kind of connecting [1:17:07] with it. We might have a series of [1:17:09] boardwalks or bridges to allow those uh [1:17:12] trails to cut through this new park [1:17:14] space and go over where the intermittent [1:17:17] stream would flow. And we'd also have a [1:17:20] a loop trail which would be down low and [1:17:23] would run through the space pick up [1:17:25] picking up from the bike trail wrapping [1:17:27] all the way around providing easy [1:17:28] passage down low through this new space [1:17:32] and connecting back into the bike trail. [1:17:34] You'll notice this one does not have [1:17:35] vehicular access. It does not have [1:17:37] parking except we imagine parking right [1:17:40] at the uh the North Fourth Street entry. [1:17:43] You'd have some parking there, but [1:17:45] otherwise vehicles would not go into [1:17:46] this one except for bikes. uh that [1:17:49] outside loop trail would be for [1:17:50] maintenance. So it'd be scaled for like [1:17:52] a pickup truck or or maintenance [1:17:54] vehicles. But the other main program [1:17:56] besides this kind of counseloring here [1:17:57] would be an outdoor education center [1:17:59] right near the entrance. So those are [1:18:02] the three options we're putting out [1:18:04] there. And as I said, you know, they [1:18:05] haven't been vetted really with Seymour [1:18:08] or Ansonia. So, it's we know there's a [1:18:11] there would be a long way to go and a [1:18:12] lot of engagement to go in any one of [1:18:14] these directions, but it's really just [1:18:16] to get people's imaginations going about [1:18:18] what could what could happen with all [1:18:20] this sediment that's going into Copont. [1:18:27] That's it. I'm going to pass it back to [1:18:28] you, Paul, and Aaron. Um, we're happy to [1:18:31] talk about I I don't know. It doesn't [1:18:33] seem like the format of this meeting is [1:18:35] one where we need to come to any [1:18:37] conclusions. Uh, but we just wanted to [1:18:40] let the group know what we're thinking [1:18:41] of and that there are a lot of options [1:18:42] out there right now. [1:18:45] » Thank you. These look they look great [1:18:48] and um I I think it is definitely [1:18:51] a conversation starter and you know I I [1:18:53] I would love for the committee members [1:18:56] or or anybody that has questions or [1:18:57] comments or anything to to speak up and [1:19:00] um and let's have a conversation about [1:19:03] it. [1:19:04] » It's a lot to absorb in one shot. [1:19:08] » [clears throat] [1:19:10] » It is. It is. Sorry about that. [1:19:13] » No, it's great. It's great. I look [1:19:16] forward to hearing more about it. I [1:19:18] actually have a better sense of it after [1:19:20] we do the tour today. I think just uh [1:19:24] the total lay of the land. [1:19:27] Jack, this is Mark Nielson. Uh just [1:19:30] couple of quick comments. Um, [sighs] [1:19:34] yeah, I've worked on trying to get the [1:19:36] energy trail sort of built in other [1:19:38] parts of the region. And one of the [1:19:42] stumbling blocks we've hit in a lot of [1:19:44] areas is, you know, proximity to the the [1:19:47] Waterberry Branch line or even the dog [1:19:49] truck rail line, you know, in Watertown [1:19:51] and farther up. Um, [1:19:55] so I I just see, you know, the options [1:19:57] of trails along the railroad as being a [1:19:59] little bit problematic and kind of [1:20:01] difficult to get the, you know, approval [1:20:03] and support from the department. Um, not [1:20:07] impossible, but I think it's just going [1:20:08] to be a real challenge. And I just I [1:20:10] know you guys recognized it in the [1:20:12] presentation and I would just emphasize [1:20:15] that you know that has to be sort of a a [1:20:19] very early action item to coordinate [1:20:21] with the department um to get their sort [1:20:24] of buy in on u [1:20:32] any other questions or comments [1:20:38] » Mark I think you froze. those. So, [1:20:40] sorry. [1:20:44] » I'm still frozen. [1:20:46] » There you there. There you are. You're [1:20:47] better. [1:20:47] » There we go. [1:20:48] » All right. So, Erin may have done that [1:20:51] just to the to [laughter] [1:20:53] keep me from talking to [1:20:55] » Um [1:20:56] » Where did I leave off? I was just sort [1:20:58] of saying that the department is, you [1:21:00] know, somebody have to reach out and [1:21:01] coordinate with you from the the very [1:21:04] beginning because it could be a [1:21:06] challenge to get them to approve. Um, so [1:21:09] that that was just my comment. [1:21:11] » Yeah. Yeah. [1:21:14] » Um, if no one else has a question, um, I [1:21:16] definitely have a few. I'll be excited [1:21:18] to talk to you more this afternoon. Um, [1:21:21] but I am curious, uh, since Copon [1:21:24] designs are in front of us or concepts [1:21:26] are in front of us. Um, I'm curious. I [1:21:30] personally love the constructed wetland [1:21:32] one. I think that's really beautiful. [1:21:34] Um, I'm wondering if you guys had an [1:21:38] assessment of the like uh existing like [1:21:42] animals and species that have made the [1:21:46] cop pond their home even if they maybe [1:21:48] shouldn't have. [laughter] [1:21:50] Um, and if that helped influence your [1:21:53] designs. [1:21:55] Um certainly we've we've begun to um [1:21:59] evaluate species all along uh the the [1:22:02] re-imagined [1:22:04] uh trail and at Copan and I'll just say [1:22:07] they're um they're preliminary um [1:22:10] observational that we've seen a wide [1:22:13] variety of of species living in Cop and [1:22:16] that was part of the uh impetus to think [1:22:20] about reconstructing some wetlands in [1:22:22] that area and making sure we're taking [1:22:24] advantage antage of the storm water to [1:22:28] um create habitat. It's not going to be [1:22:30] pond habitat. Um that's that's going to [1:22:33] go away, but um that we provide [1:22:35] opportunities for really a diversity of [1:22:38] habitat within that space. I I know [1:22:40] that's not a direct answer to your [1:22:42] question in terms of evaluation of [1:22:44] what's there. Um but but we are you know [1:22:47] clearly we are changing things [1:22:49] tremendously in that area but we want to [1:22:51] make sure what we put back provides as [1:22:54] much habitat or more um in terms of [1:22:57] diversity and opportunities for wildlife [1:22:59] and for um native plant communities to [1:23:02] thrive there. [1:23:03] » And Glenn I could add to that. I mean [1:23:04] there's been there hasn't been any [1:23:05] formal like biological inventory of cop [1:23:10] um and I'm not I'm not sure we're gonna [1:23:12] do that. Um I mean our it's essentially [1:23:16] a an open water body. Uh that's its [1:23:20] primary feature and and source of [1:23:23] habitat um and and type of habitat. Um [1:23:27] there isn't a whole lot of um like [1:23:30] diverse wetlands. There is there is like [1:23:32] a where the uh stream the existing [1:23:34] stream enters the enters the pond is uh [1:23:37] is now unfortunately a little delta [1:23:39] that's dominated by frag. Um but that is [1:23:42] a slightly different type of wetland [1:23:43] than the rest of the open water. Deep [1:23:46] Fisheries has been the one that's um you [1:23:48] know a major proponent of this project [1:23:51] and um when we've turned to them to say [1:23:53] hey what are your thoughts about you [1:23:56] know Copon and what you know what will [1:23:58] be potentially lost uh by by uh [1:24:02] dewatering and and utilizing this for [1:24:04] sediment disposal. Um and their their [1:24:07] take has been, you know, the the river [1:24:09] the open river matters way more than [1:24:11] this one pond. Um and some of the [1:24:15] surrounding residents have raised [1:24:16] concerns about, you know, what about the [1:24:17] eagles and the ospreys? Well, the eagles [1:24:19] and ospreys have much more to gain from [1:24:21] the removal of the dam and the [1:24:23] restoration of of the fisher uh than [1:24:25] they do from the fish that they may be [1:24:27] getting out of out of CO pond. And the [1:24:30] other part of the assessment that has [1:24:31] not been done is really the biological [1:24:34] um impacts of like the contamination in [1:24:36] Copond itself where we we don't really [1:24:39] know um what kind of um uh burden that [1:24:44] is being held right now by fish and [1:24:46] moving up the food chain from the [1:24:47] contamination in Copond. um we just know [1:24:50] it's probably not good and we've been [1:24:52] telling people it this has always been [1:24:54] private so it's never been fishable in [1:24:55] that respect but definitely shouldn't be [1:24:57] fished and nobody should be consuming [1:24:59] anything out of cop because of the [1:25:01] potential for that risk. Um so those [1:25:04] things haven't been assessed because um [1:25:06] well um I think in the totality of the [1:25:11] project um it's um it it may be moot you [1:25:16] know um because there's so much more to [1:25:18] gain from the restoration of the of [1:25:20] opening up the river um than the loss of [1:25:24] of this pond. So ponds and open water [1:25:26] bodies like them are very common in the [1:25:28] in the state. Some of them are uh many [1:25:30] of them may be behind dams but behind [1:25:32] dams that are serving us a a purpose um [1:25:35] more than just the pond habitat itself. [1:25:37] So um whereas open rivers are the are [1:25:40] the uh the endangered habitat type in [1:25:43] the state if you will. So um this is all [1:25:46] perceived as sort of a net game even if [1:25:49] there is loss to certain wildlife. I'll [1:25:52] I'll also add Paul, we we even haven't [1:25:54] talked about this and we're just [1:25:55] beginning to work on it with GEI, but [1:25:58] all of the recovered land in the flood [1:26:00] plane is uh new habitat that's going to [1:26:03] be created as the empoundment goes away. [1:26:06] It's and it's a tremendous opportunity. [1:26:08] All that green. You can go back to that [1:26:10] one, Emily. Um, and just show all that [1:26:12] new green land we're imagining as [1:26:15] potentially new constructed wetlands or [1:26:17] at least um native habitat zones that's [1:26:20] going to be going back. Um, that's now [1:26:23] currently covered up by the empoundment. [1:26:38] Okay. Any anything else to be brought [1:26:40] up? [1:26:44] Going a little bit late and uh I know we [1:26:46] have to get ready to [1:26:49] uh get out there for 1:00. Uh Erin, do [1:26:52] you just want to quickly tell everybody [1:26:54] again how to get to the location? [1:26:57] » Sure. So, I sent um I sent an email and [1:27:00] I sent a um calendar invite to everybody [1:27:03] that had a link to a Google link to the [1:27:06] location. Um if you don't have that, you [1:27:10] can Google or, you know, map yourself to [1:27:14] the Seymour Public Works Department. Um [1:27:17] and the dam is right next door to that. [1:27:19] So, we'll be parking in a parking lot. [1:27:24] It's sort of a dirt parking area in [1:27:26] between the public works yard and the [1:27:28] dam. Um and that's in Seymour. Uh we'll [1:27:31] be meeting at 1:00. Um we'll do a quick [1:27:35] tour of the powerhouse and and the dam [1:27:38] um from that side and then we can go [1:27:40] over and and explore um over near and [1:27:42] around Cop um in Ansonia. So um so yeah, [1:27:49] everybody's welcome. Um I hope to see [1:27:51] all of you there. Um, folks from [1:27:54] Stimson, I'm not sure if you're going to [1:27:55] be able to make it out there. I know you [1:27:56] guys have a bit of a drive if you are. [1:27:58] Um, but, uh, you know, just shoot me a [1:28:01] line to let me know. Uh, thumbs up or [1:28:03] thumbs down. And, um, and yeah, I'm I'm [1:28:06] looking forward to showing everybody [1:28:07] around. [1:28:08] » Yeah. Luckily, it's not too brutal of a [1:28:11] day out there today, so looking forward [1:28:13] to it. [1:28:13] » It looks nice. [1:28:14] » Bring some bug spray though, I think, [1:28:16] Erin. Right. [1:28:17] » Yeah. Please wear wear sturdy shoes and [1:28:19] long pants. There's a lot of poison ivy. [1:28:21] It's It's not easy walking everywhere. [1:28:25] Um and yeah, there are there are [1:28:26] mosquitoes out there. I think I have [1:28:28] some bug spray here that I'll bring, but [1:28:30] um [1:28:30] » Okay. [1:28:31] » Yeah. [1:28:33] » And area, I see you've got the um our [1:28:36] next meeting November 4th, which is [1:28:38] Veterans Day. Uh [1:28:39] » So so it's it's a week early because of [1:28:41] Veterans Day. Veterans Day is on the [1:28:43] 11th um which [1:28:45] » Not our meeting our normal meeting day. [1:28:47] So we bumped it up one week. Um so it'll [1:28:49] be on the 4th. So, it's not it's not the [1:28:51] usual second [1:28:52] » Wednesday. It's the it's actually the [1:28:54] first Wednesday in November. [1:28:56] » All right. So, everyone adjust your [1:28:57] schedule accordingly. I don't know if [1:28:58] we'll see as many people on November [1:29:00] 4th, but it was great to have so many [1:29:02] people on today. A lot of great [1:29:05] information. A lot to think about. Lot [1:29:07] to think about. So, all right. Thank [1:29:09] you. [1:29:10] » Thank you. [1:29:11] » Thanks everyone. Thanks for