1 00:00:00,000 --> 00:00:06,280 pertains to our first public hearing on ordinance 2026-03. 2 00:00:11,440 --> 00:00:17,440 Current and proposed building permit fee rates and proposed additional flat fee 3 00:00:15,440 --> 00:00:22,160 are described um as follows. Our current rate is $5 4 00:00:20,160 --> 00:00:27,279 per thousand, a project value with a minimum fee of $25. 5 00:00:24,480 --> 00:00:32,800 The proposed rate is $6 per thousand or a fraction thereof of project value with 6 00:00:29,679 --> 00:00:39,040 a minimum fee of $75. This is a rate increase of 20%. 7 00:00:35,120 --> 00:00:44,160 The proposed additional flat fee of $75 or the proposed additional flat fee is 8 00:00:41,120 --> 00:00:49,640 $75 with no minimum. This is an increase of 100% from um $0 previously. 9 00:00:53,920 --> 00:01:01,199 For example, for a project with a proposed value of 400,000, 10 00:00:58,079 --> 00:01:07,840 the permanent fees are calculated um as follows. The current fee structure um 11 00:01:04,000 --> 00:01:12,799 with the value based fee of $5 per 400 um would be $5 for each,000 and fraction 12 00:01:10,479 --> 00:01:16,159 thereof of propo proposed value would be $2,000. 13 00:01:14,320 --> 00:01:22,400 With the proposed fee structure, there would be a flat fee of $75. 14 00:01:18,960 --> 00:01:26,880 Then the value based fee um would be $6 time 400 15 00:01:24,560 --> 00:01:32,400 um which is $6 for each thousand and a fraction thereof of proposed value for a 16 00:01:29,680 --> 00:01:39,159 total of $2,400. And so the total permit fee in the 17 00:01:34,240 --> 00:01:39,159 proposed structure would be $2,475. 18 00:01:41,040 --> 00:01:51,040 This is an increase of 20% in value based fee and 24% in total permit fee. 19 00:01:48,479 --> 00:01:56,600 pull up now. There we go. This these are the examples 20 00:01:52,799 --> 00:01:56,600 I just ran through here. 21 00:01:57,360 --> 00:02:05,759 Okay. Um for trade permits, demolition permits, signs, and display structures, 22 00:02:02,880 --> 00:02:10,959 the original fee is a $25 minimum when when there's a permit required or $5 per 23 00:02:08,479 --> 00:02:18,959 thousand of work beyond the minimum. The proposed fee here would be $75 flat fee 24 00:02:13,680 --> 00:02:25,440 plus $6 per,000 of work. For manufactured homes, the original fee 25 00:02:21,599 --> 00:02:31,440 is $150 per single wide and $175 per double wide. Proposed fee would be $75 26 00:02:28,800 --> 00:02:37,000 flat fee and again $6 per thousand of project value plus any applicable trade 27 00:02:34,000 --> 00:02:37,000 permits. 28 00:02:39,200 --> 00:02:45,280 We also have reinspection fees and special use permits when required by 29 00:02:42,800 --> 00:02:51,280 local or state statutes. The original fees for this is $25 per additional 30 00:02:48,000 --> 00:02:57,200 inspection and $25 for special use permit. Proposed fees would go to $75 31 00:02:54,560 --> 00:03:01,519 per additional inspection and also $75 for a special use permit. 32 00:02:59,599 --> 00:03:05,599 There is also language added to define being ready for an inspection, 33 00:03:03,200 --> 00:03:10,280 expectations of inspectors, and access being provided to sites for inspections. 34 00:03:12,239 --> 00:03:22,319 We have some new proposed fees. Um, we propose a fee for stop work order of 35 00:03:18,400 --> 00:03:29,440 $100 plus $50 per site visit. Work without a permit would be $250. 36 00:03:25,200 --> 00:03:35,440 A temporary co is $150 plus $150 per month. Um, a plan amendment would be $50 37 00:03:32,799 --> 00:03:38,440 minimum and a canceled permit a $75 minimum. 38 00:03:38,772 --> 00:03:40,792 » [snorts] 39 00:03:41,599 --> 00:03:49,760 » Some projected revenue impacts of the fees proposed for the building permit 40 00:03:45,280 --> 00:03:57,599 fees are shown here. The additional $75 flat fee proposal. Um the potential 41 00:03:53,519 --> 00:04:03,280 revenue there would be $49,125. This is taking the $75 flat fee and 42 00:04:00,239 --> 00:04:08,720 multiplying it by the $655 annual average annual permits. 43 00:04:06,159 --> 00:04:16,120 The value base fee increase from $5 per thousand to $6 per thousand would 44 00:04:11,519 --> 00:04:16,120 generate a fee rate increase of $71,600. 45 00:04:16,959 --> 00:04:22,440 The projected average annual revenue is $478,725 46 00:04:23,680 --> 00:04:29,880 and currently the FY27 operating budget is $433,366. 47 00:04:30,720 --> 00:04:39,240 Um this is noted to be prior to inclusion of the 3 and a half% salary 48 00:04:35,120 --> 00:04:39,240 increase and benefits transfer. 49 00:04:39,360 --> 00:04:46,440 This um equates to a revenue operating budget recovery rate of 110%. 50 00:04:46,479 --> 00:04:53,360 And again that's prior to the salary increase being transferred into that 51 00:04:50,960 --> 00:04:58,479 departmental budget. So in conclusion, um there's an 52 00:04:56,560 --> 00:05:03,600 estimated minimal impact to consumers with these fee increases. The proposed 53 00:05:01,199 --> 00:05:07,680 fee adjustments move the department to estimated full operational st 54 00:05:05,440 --> 00:05:11,600 sustainability. Virginia law requires these funds to 55 00:05:09,440 --> 00:05:15,360 support building department functions. Additional revenue supports code 56 00:05:13,199 --> 00:05:20,039 enforcement, staff retention, facility maintenance, and long-term operational 57 00:05:17,039 --> 00:05:20,039 stability. 58 00:05:20,639 --> 00:05:27,680 So, next step is to answer any questions you might have. Um, then conduct the 59 00:05:25,840 --> 00:05:32,440 public hearing and consider adoption of the ordinance. 60 00:05:28,880 --> 00:05:32,440 » This is public hearing. 61 00:05:32,479 --> 00:05:38,919 » Yes, just one. >> Yes. Public hearing number one. 62 00:05:38,960 --> 00:05:45,919 » I've got comments, but public hear. But no questions for her for 63 00:05:44,400 --> 00:05:50,479 clarification. Okay. Anybody have questions for Candy? 64 00:05:51,520 --> 00:06:01,440 All right, hearing none. Um, we're going to open the public hearing for O2026-03 65 00:05:59,360 --> 00:06:09,600 amendment to chapter 4 buildings article 2 building code. 66 00:06:04,800 --> 00:06:16,319 All right, we have no one sign up. I have a feeling we have a taker. 67 00:06:13,520 --> 00:06:19,199 Please state your name and address. Uh, and if you are representing yourself, 68 00:06:17,840 --> 00:06:24,080 you get three minutes. >> Yeah, I'm just my name is Phil Pervis 69 00:06:21,869 --> 00:06:29,440 [clears throat] 509 made land uh shipment, Virginia. Um, I just hadn't 70 00:06:27,199 --> 00:06:34,160 really had a lot of time to read up on this, but it seems like 150% increase in 71 00:06:32,720 --> 00:06:39,199 some of these fees is a little excessive. I mean, we're dealing with uh 72 00:06:37,919 --> 00:06:44,639 extremely [clears throat] high building cost as it is. We're trying to get make 73 00:06:41,840 --> 00:06:50,000 uh homes affordable for young people and every time we turn around we're adding 74 00:06:47,360 --> 00:06:55,600 you know we're this adds no value just adds cost to the house. It makes it 75 00:06:52,400 --> 00:07:02,240 difficult for younger people to uh you know to to buy or or even think about 76 00:06:59,360 --> 00:07:07,759 it. I mean it's almost out of u range for most young people uh today as it is. 77 00:07:05,919 --> 00:07:13,039 But I I think we really ought to take a hard look at I mean I know that things 78 00:07:10,000 --> 00:07:19,280 are going up. I mean, labor costs are are higher for the uh building officials 79 00:07:15,520 --> 00:07:23,759 and everything, but 150% increase on some of these things, I think, is really 80 00:07:21,475 --> 00:07:29,919 [clears throat] excessive and it's just creative hardship for uh not only I 81 00:07:26,800 --> 00:07:36,800 mean, the builder has to add uh cost to build which is passed right on to the um 82 00:07:34,479 --> 00:07:40,960 to the uh whoever's purchasing or whoever they're building for. And I 83 00:07:38,720 --> 00:07:45,440 think if we're trying to want to try to make housing more affordable affordable 84 00:07:43,759 --> 00:07:49,199 for people here in Nelson County. We need to take a hard look at some of 85 00:07:46,800 --> 00:07:53,680 these things and see if we can't trim it back a little bit. I know that like I 86 00:07:50,720 --> 00:07:59,919 said, everybody's cost is going up and I know uh certainly the building 87 00:07:55,840 --> 00:08:05,120 inspections have uh have, you know, the raises and and uh everything. But I 88 00:08:03,199 --> 00:08:10,639 think you get my drift here. It's just that just seems a little excessive. Uh I 89 00:08:08,319 --> 00:08:17,360 think for one, you know, going in and some of us from zero to over 100% is 90 00:08:14,160 --> 00:08:20,000 just uh really high, but I think I'm opposed to that for what it's worth. 91 00:08:19,199 --> 00:08:26,400 Thank you. >> Thank you. 92 00:08:22,560 --> 00:08:34,120 So, no one else has signed up. Any other takers? 93 00:08:28,720 --> 00:08:34,120 We're going to co close public hearing. 94 00:08:34,399 --> 00:08:43,919 All right. Any discussion questions? >> Um, Candy real quick. So, in 95 00:08:42,320 --> 00:08:47,040 conversations with those the building community, we do understand and we are 96 00:08:45,519 --> 00:08:53,360 very much interested in the retention of our employees. So, some changes within 97 00:08:51,279 --> 00:08:59,440 the change of fees and how we're structuring it is reasonable. Um, 98 00:08:57,200 --> 00:09:02,880 especially the ones where, you know, he's getting called out because there's 99 00:09:00,720 --> 00:09:08,399 no permit. You know, yes, there needs to be a fee there. the standard 75 makes 100 00:09:04,800 --> 00:09:13,920 sense. Uh TCO's that's a very reasonable expectation. Um, 101 00:09:10,959 --> 00:09:20,160 I think one that I would probably bode well amongst the builder community and 102 00:09:16,080 --> 00:09:26,720 the consumer would be having the uh having the um 103 00:09:22,959 --> 00:09:35,120 instead of doing a the flat fee, just do the minimum as 75 $75 and then increase 104 00:09:30,800 --> 00:09:40,080 it from five to six and then we keep the rest of the language as is if that makes 105 00:09:37,440 --> 00:09:44,880 sense. Um, I I just think it's a little bit 106 00:09:41,680 --> 00:09:50,880 unnecessary to add in a flat random $75 fee because certainly you might perceive 107 00:09:47,519 --> 00:09:55,360 that as a uh a small number in the whole story. But let's I I think it should be 108 00:09:52,800 --> 00:09:58,959 a $75 minimum that takes it up to I think it's essentially $10,000 worth of 109 00:09:57,519 --> 00:10:03,920 work. I think that is kind of like that arbit not arbitrary number but that 110 00:10:00,959 --> 00:10:07,920 number would fit in. And then the mechanicals I think that's reasonable to 111 00:10:05,680 --> 00:10:15,680 be 75. All that makes sense. I just think we should do the five to six and 112 00:10:10,800 --> 00:10:19,720 just do the min a minimum of $75. That's my only take. 113 00:10:23,200 --> 00:10:27,600 » It's almost semantics. It's the same thing. 114 00:10:26,240 --> 00:10:33,519 » I mean, it's going to be 75. >> No, it's not 75 if up to $10,000. After 115 00:10:31,360 --> 00:10:40,200 that, it goes if it's above that, then you get to the $6 per thousand, which 116 00:10:36,640 --> 00:10:40,200 would be more than 117 00:10:44,160 --> 00:10:50,399 Yeah. The original fee is 20 $25 minimum and then the $5 per thousand. 118 00:10:49,920 --> 00:10:54,959 » Yeah. >> So, you're proposing to do $75 minimum, 119 00:10:53,760 --> 00:10:57,959 » $6 per thousand, >> correct? 120 00:11:00,240 --> 00:11:07,760 I mean, how many building permits fall into the minimum? I mean, 121 00:11:07,040 --> 00:11:11,839 » percentage. >> Quite a few. 122 00:11:10,072 --> 00:11:15,160 [clears throat] >> Can you come forward? 123 00:11:16,399 --> 00:11:21,120 » Sorry, wrong microphone. >> I don't I don't have the exact number, 124 00:11:18,880 --> 00:11:23,279 but I believe it would be it would be roughly. 125 00:11:22,000 --> 00:11:27,600 » She wants microphone. Go >> the mic. 126 00:11:25,040 --> 00:11:31,519 I don't have the exact number of the permits that would be that would fall 127 00:11:29,440 --> 00:11:36,000 into the minimum range. Uh but it would be somewhere if I had to guess it would 128 00:11:33,440 --> 00:11:40,000 be professional guess but somewhere in the 129 00:11:38,399 --> 00:11:48,959 20% mark. Uh the the $75 flat fee 130 00:11:45,120 --> 00:11:56,560 uh versus a $75 minimum. And you know this is just rough math. Um the the $6 131 00:11:54,240 --> 00:12:00,880 th000 versus the $5 on a thousand would increase by and again Kent just went 132 00:11:58,720 --> 00:12:06,160 over this but and I'm going off of memory of this a month ago. I haven't 133 00:12:03,519 --> 00:12:11,600 looked at it since but uh that would increase uh potentially 134 00:12:09,279 --> 00:12:19,120 increase based on the last four years of averages um by 20%. Right. and uh and 135 00:12:16,959 --> 00:12:24,079 then that would get us just under 136 00:12:21,760 --> 00:12:31,680 the 20% would get us just under operating budget cost. So if we did not 137 00:12:27,839 --> 00:12:36,320 do a flat fee um and I can pull these numbers up, I can 138 00:12:33,839 --> 00:12:40,880 go grab my iPad and pull these numbers up. uh then it would it would bring us 139 00:12:38,160 --> 00:12:45,519 right just under operating budget >> currently 140 00:12:41,760 --> 00:12:51,200 » current operating budget uh with the 20% increase and and and with the $75 flat 141 00:12:47,680 --> 00:12:54,480 fee and the other fees included hypothetically 142 00:12:52,800 --> 00:12:58,639 it could bring us to operating costs that may be slightly over slightly under 143 00:12:56,800 --> 00:13:02,880 on an average >> currently 144 00:12:59,680 --> 00:13:07,160 » currently. Yeah. Right. Uh the $75 flat fee uh was 145 00:13:07,279 --> 00:13:13,639 was an option for the board to consider to take us beyond 146 00:13:13,920 --> 00:13:22,800 » operating budget. Uh so so I would not say again right it would be the board's 147 00:13:20,399 --> 00:13:27,279 decision uh the building department myself the building code official we 148 00:13:24,240 --> 00:13:33,040 will do and work with whatever it is that we need to work with we'll figure 149 00:13:29,279 --> 00:13:39,600 it out um but we're tasked with 150 00:13:36,720 --> 00:13:42,959 giving you viable options and those are the viable options. 151 00:13:41,120 --> 00:13:47,360 » Remind me again the last time that we updated these 152 00:13:45,120 --> 00:13:52,720 It's um it's different depending on which which um code sections you look 153 00:13:50,399 --> 00:13:55,839 at. Um I don't have this one in front of me. I think some of them were early 154 00:13:54,240 --> 00:13:58,639 2000s, some >> so easily 20 years, 155 00:13:57,680 --> 00:14:02,339 » I think. So yeah. >> Yeah. 156 00:13:59,519 --> 00:14:05,680 » Yeah. And then some that we'll [clears throat] see here in a minute 157 00:14:03,680 --> 00:14:10,639 with ENS andor >> Yeah. I'm using devices that maybe 158 00:14:09,040 --> 00:14:16,639 like >> and I think kind of in response to that 159 00:14:14,000 --> 00:14:22,240 also what has increased exponentially is the cost of building structures. So a 160 00:14:19,839 --> 00:14:26,720 house 20 years ago $5. Correct? Yes. So that makes sense. But those structures 161 00:14:24,480 --> 00:14:31,680 are now double if not triple what they once were able to build back in 2002. So 162 00:14:29,839 --> 00:14:35,920 you're getting that you're still getting a lot of that value just on the 163 00:14:33,360 --> 00:14:41,199 inflationary factor of construction. Um, we see that a lot with how we treat 164 00:14:39,120 --> 00:14:45,839 the real estate tax rate as well. We live off of the inflation of it. 165 00:14:42,480 --> 00:14:51,199 Normally, we don't increase it. Um, generally speaking, I mean, building 166 00:14:48,480 --> 00:14:55,600 departments don't normally run a surplus in fees to operate. And that I can 167 00:14:53,760 --> 00:15:00,880 probably speak for most neighbors of the localities around us. They don't operate 168 00:14:57,680 --> 00:15:03,760 on a surplus. It's very I don't know any that do. Maybe some of the big guys are. 169 00:15:03,360 --> 00:15:06,959 Oh, >> I'm just going to say based on that 170 00:15:05,760 --> 00:15:11,120 math, it could be in an hour where they're not operating in a surplus. 171 00:15:09,120 --> 00:15:14,639 » It could be what? >> If we go back to the potential of 172 00:15:13,120 --> 00:15:17,639 running into a surplus, >> yeah, 173 00:15:17,920 --> 00:15:21,519 » salaries are changing all the time. >> Sure. 174 00:15:20,480 --> 00:15:24,399 » One could change today. >> One could change and then immediately 175 00:15:22,959 --> 00:15:28,959 send Yeah, I see. I >> So that is not an argument because it's 176 00:15:26,480 --> 00:15:30,399 not a long it's not a large number. >> The difference 177 00:15:29,839 --> 00:15:33,839 » the difference >> and that's just the operating budget. 178 00:15:31,920 --> 00:15:36,800 there are a lot more costs that go >> like they need a new building 179 00:15:35,120 --> 00:15:41,600 » towards you know >> it's falling into a creek. 180 00:15:39,040 --> 00:15:48,639 » So So yeah so like so like the building right we we we may not necessarily be 181 00:15:46,000 --> 00:15:53,440 or have planned to build a a brand new building. Uh but there are things that 182 00:15:51,199 --> 00:15:58,000 we're looking into currently. Uh I've requested um a specific amount of money 183 00:15:56,160 --> 00:16:04,959 in the CIP, the capital improvement project fund. Uh that was given to us 184 00:16:01,199 --> 00:16:07,600 $115,000 towards u you know having someone come out and look at the 185 00:16:06,000 --> 00:16:13,759 building and do a structural assessment. It is believed that our building um was 186 00:16:10,800 --> 00:16:18,480 built on back fill unbeknownst to anyone. Correct. U there have been some 187 00:16:16,320 --> 00:16:23,120 erosion lately based on weather events and things of that nature, some cracks 188 00:16:20,639 --> 00:16:27,839 in the building and um we should probably have it looked at. So, you 189 00:16:24,880 --> 00:16:32,000 know, that money, not not to mention just the regular cost, you know, the 190 00:16:29,680 --> 00:16:36,880 people come service our HBAC, Southern Air, uh when the maintenance department 191 00:16:34,639 --> 00:16:42,480 comes over and works on things and or fixes things, the light bills, the the 192 00:16:39,120 --> 00:16:46,000 the personal property tech, you know what I'm saying? Like, and then 193 00:16:44,560 --> 00:16:50,560 replacement costs. You know, those things aren't taken into the annual 194 00:16:48,160 --> 00:16:56,160 budget. We have three vehicles. We need three vehicles. Um the Ford Explorer 195 00:16:53,279 --> 00:17:01,600 that I have is currently, you know, on it on its very last leg. We're doing all 196 00:16:57,839 --> 00:17:05,199 we can, but even at a $20,000 per vehicle, if we, you know, we're buying 197 00:17:03,040 --> 00:17:09,199 them as cheap as we can get them off of four fleet with all the discounts, uh 198 00:17:07,120 --> 00:17:13,439 that's still a three vehicle replacement every five years. So you know those are 199 00:17:11,839 --> 00:17:17,199 additional things on the budget that aren't taken into consideration for that 200 00:17:16,000 --> 00:17:21,679 number >> right and how we treat those things 201 00:17:20,079 --> 00:17:25,520 obviously there's motor pool we kind of try to source that that's kind of a 202 00:17:23,520 --> 00:17:28,799 though I understand it is related to the building department you know we look at 203 00:17:27,280 --> 00:17:34,880 the grants of all the departments and how we so I madam chair I don't know 204 00:17:32,559 --> 00:17:38,799 what the best mechanism you would like to kind of get to a conclusion on that 205 00:17:36,720 --> 00:17:41,120 I'm generally supportive of all the fees that have been proposed with those 206 00:17:40,000 --> 00:17:50,240 increases I only have uh objections to the minimum 207 00:17:45,679 --> 00:17:53,760 to flat. I if to make it simpler um we should just see if we have a consensus 208 00:17:51,600 --> 00:17:57,280 on that. We don't have to do a vote but just generally get an idea because if I 209 00:17:55,840 --> 00:18:01,200 don't if there's no consensus then there's no sense in having 210 00:17:59,360 --> 00:18:06,880 » I would like to also add I don't mean to interject or make this work and I and I 211 00:18:03,440 --> 00:18:10,400 can talk Mr. Perves later about this but there is nothing in there that is higher 212 00:18:08,880 --> 00:18:14,720 than a 20% increase or right 213 00:18:11,919 --> 00:18:21,280 » a or a new fee. So the things that are you know 100% increase that is there was 214 00:18:18,640 --> 00:18:26,640 never a fee to you know there was no stop order fee now there is one so 215 00:18:24,000 --> 00:18:29,600 that's a that's a 100% increase everything else is 216 00:18:28,480 --> 00:18:32,320 » nothing higher than >> none of the existing fees are increasing 217 00:18:31,679 --> 00:18:34,240 150% >> none of the existing fees they never 218 00:18:33,840 --> 00:18:40,240 existed >> it's it's just increasing um 219 00:18:36,799 --> 00:18:46,559 » you know from $5 to to $6 there is one that is the um uhh there is one that has 220 00:18:43,679 --> 00:18:49,200 changed significantly that is the manufactured homes 221 00:18:48,240 --> 00:18:52,400 » that one could >> and that yeah that one needs that's 222 00:18:51,039 --> 00:18:56,559 that's a good one to change >> but uh but right and that was a general 223 00:18:54,240 --> 00:19:02,080 consensus among neighboring localities and all of the builders etc and all of 224 00:18:59,600 --> 00:19:07,200 these things were looked into so um I just don't want Mr. 225 00:19:04,799 --> 00:19:12,240 or anyone listening to this to think that somehow in here we're price gouging 226 00:19:10,320 --> 00:19:16,640 or some kind of this is literally just trying to break even and and 227 00:19:15,760 --> 00:19:24,559 » anyway >> so for me I you know whether $75 is the 228 00:19:20,720 --> 00:19:31,440 number or not that's debatable but there is a cost of having to pull up the 229 00:19:29,039 --> 00:19:35,200 the the application or pull out the piece of paper and fill it in and 230 00:19:33,440 --> 00:19:41,200 process it. And that doesn't matter if it's a $10,000 job or a $400,000 job, 231 00:19:39,280 --> 00:19:47,520 you know, the initial cost. So a flat fee to me for each application I support 232 00:19:44,320 --> 00:19:52,480 because the the amount of work for staff um and then um now whether 75 is the 233 00:19:50,320 --> 00:19:59,520 right number or not I don't know but I I do um see similarities in my work 234 00:19:56,640 --> 00:20:05,280 environment and and there are certain set expenses to do a transaction um no 235 00:20:03,440 --> 00:20:07,520 matter how big or small the transaction is 236 00:20:05,840 --> 00:20:12,320 » and that's that's why there's a minimum fee as well because if you're only 237 00:20:09,039 --> 00:20:17,200 doing10 $10,000 of work, which can be HVAC system. It could be some mechanical 238 00:20:14,559 --> 00:20:20,480 changes within a house. Yeah, I agree with you. That's where that 75. I'm just 239 00:20:19,039 --> 00:20:24,000 saying that when you start getting into projects that are hitting that three, 240 00:20:22,240 --> 00:20:28,400 four, five, yes, I understand it's minimal, but at the same time, showing 241 00:20:26,160 --> 00:20:32,559 some level of a, hey, you're going to be doing another $100,000. Well, six times 242 00:20:30,400 --> 00:20:37,520 another hundred, you know, it's a lot more money. It's a lot of money. I mean, 243 00:20:34,480 --> 00:20:41,200 these permits are not cheap these days, as people in the audience have 244 00:20:38,720 --> 00:20:44,720 indicated, and you start doing two 300,000. Yeah, you're right. 75 bucks 245 00:20:43,280 --> 00:20:48,960 seems like nothing, but you compound that with the 8,000 things through the 246 00:20:46,880 --> 00:20:54,559 course of a job site for a client and then change. Yeah, it does start adding 247 00:20:51,039 --> 00:20:58,640 up. Um, and again, Madam Chair, you can just get a consensus and then we can 248 00:20:56,080 --> 00:21:03,360 exit this conversation. So, >> what's the expectation for tonight? Are 249 00:21:00,640 --> 00:21:06,559 we expect are we voting on these um ordinances tonight or are we taking 250 00:21:04,880 --> 00:21:10,000 these into consideration? What are we doing? 251 00:21:07,200 --> 00:21:16,000 » I I felt that it was prudent that the building community have enough time to 252 00:21:13,200 --> 00:21:20,400 know where we stand so they have time to prepare by January. 253 00:21:18,640 --> 00:21:21,840 » That was the general consensus at the last. 254 00:21:20,640 --> 00:21:26,000 » So the answer is both to >> I would love that. 255 00:21:22,640 --> 00:21:30,960 » Yeah. Okay. [laughter] I got it. Um, and you know, I wouldn't be opposed to 256 00:21:28,880 --> 00:21:34,799 making the minimum $100 and not having a flat fee. 257 00:21:33,600 --> 00:21:36,799 » I can do that. >> You know, that's 258 00:21:35,919 --> 00:21:38,960 » um >> 100 bucks. 259 00:21:37,600 --> 00:21:42,000 » Again, we have to understand that there's a certain amount of work that 260 00:21:40,080 --> 00:21:47,760 that office has to do. No matter whether the job is a $10,000 job or 100,000 or 261 00:21:45,360 --> 00:21:52,720 500, there's some initial startup work that has to be done. It it would be 262 00:21:50,080 --> 00:21:57,360 better to have the minimum at 100 to 150 bucks than to throw that flat rate 263 00:21:55,919 --> 00:22:01,120 because I think 20%. >> How about we ease into 100 as a minimum 264 00:22:00,000 --> 00:22:04,320 and do away with flat >> 25. 265 00:22:01,760 --> 00:22:07,520 » Yeah. Okay. So 100 minimum. 266 00:22:05,120 --> 00:22:10,000 » All right. Anyone else? There's two >> five of us at this thing. Anybody else 267 00:22:09,360 --> 00:22:12,799 at 100? >> 100 minimum. 268 00:22:10,720 --> 00:22:14,640 » All right. Consensus at 100. Thoughts. Ernie 269 00:22:13,520 --> 00:22:18,960 » going once. Going twice. >> Um 270 00:22:16,159 --> 00:22:21,840 and that's basically two 10 grand. Yeah, >> I I haven't done I haven't done the 271 00:22:20,559 --> 00:22:25,520 math, but it's going to alter those numbers significantly. If you guys are 272 00:22:23,760 --> 00:22:28,159 thinking about, you know, things that you'll be thinking about some other 273 00:22:27,120 --> 00:22:31,760 time. >> If if you're thinking about changing 274 00:22:29,760 --> 00:22:35,600 what's on here, we should not take action tonight until we have some 275 00:22:33,440 --> 00:22:41,919 numbers to compare. And I think that's true. 276 00:22:36,559 --> 00:22:47,840 » Um um which is why which is why not >> No. So, um, but you know, it's it it's 277 00:22:45,280 --> 00:22:53,280 one thing to focus on building costs and contractors and such. It's another thing 278 00:22:49,600 --> 00:22:57,039 to focus on our department. And, um, and I think that this does value to both of 279 00:22:55,840 --> 00:23:01,600 them. I mean, if it's been 20 years since anything's increased, that's, you 280 00:22:58,559 --> 00:23:05,360 know, 1% a year over 20 years or less than that, less than 1% a year. I mean, 281 00:23:03,280 --> 00:23:11,200 that's that's, you know, infantestimal in my, you know, negligible, you know, 282 00:23:07,840 --> 00:23:15,120 as far as I'm concerned. But um but you know being able to you know retain our 283 00:23:13,520 --> 00:23:19,039 staff and give them the support that they need to do the job they have. Um 284 00:23:17,360 --> 00:23:25,440 you know I I kind of weigh in on that side. I I would like to add that a that 285 00:23:22,799 --> 00:23:29,919 a significant amount of time and effort was put into 286 00:23:27,600 --> 00:23:33,919 into this and I I do realize that you know job costs are high and things of 287 00:23:31,760 --> 00:23:42,000 that nature but the the operating costs and again if we're operate to break even 288 00:23:39,919 --> 00:23:47,840 this is this is where we are right like if we don't want to do that that's fine 289 00:23:44,240 --> 00:23:51,840 but uh you know the $75 flat fee it was taken into consideration okay How long 290 00:23:49,600 --> 00:23:55,679 does it take to process a permit? What does it go through? How much paperwork's 291 00:23:53,520 --> 00:24:01,039 involved? How much involved? How much personnel power is involved? And how 292 00:23:57,280 --> 00:24:04,640 many inspections on average per this? Uh, you know, because if somebody says, 293 00:24:02,960 --> 00:24:10,159 "Okay, well, I mean, people come in all the time and they say, "Oh, well, my 294 00:24:06,480 --> 00:24:12,400 project's only $3,000." >> Okay, well, 295 00:24:10,880 --> 00:24:18,159 » that's a h 100 bucks. >> Yeah. But if they come in and say it's, 296 00:24:15,679 --> 00:24:23,840 you know, $9,000 and then we've got to go out there and do three inspections 297 00:24:20,559 --> 00:24:28,559 and process a permit, then someone has to handle that permit processing for an 298 00:24:26,640 --> 00:24:31,919 hour and a half. And then we've got to drive out there at an hourly rate of, 299 00:24:30,720 --> 00:24:33,760 you know, however long it takes one person to go out there, three separate 300 00:24:33,279 --> 00:24:35,919 times. >> Yeah. 301 00:24:34,240 --> 00:24:41,440 » I I'm just saying like those things were taken into consideration before the flat 302 00:24:38,480 --> 00:24:45,440 fees and the 600 bel. And I I think and I I completely understand whether 303 00:24:43,919 --> 00:24:49,520 whether it's the objective of this board to have a surplus base building 304 00:24:47,279 --> 00:24:55,760 department or net neutral whatever it may be. I don't know at this point I 305 00:24:54,159 --> 00:25:00,080 most people see the building department in its in its you know uh not 306 00:24:58,720 --> 00:25:05,200 necessarily invention but really it was to have a safe affordable mechanism for 307 00:25:02,240 --> 00:25:08,320 people to build structures and have safe quality housing. Right? It's the same 308 00:25:06,880 --> 00:25:12,159 thing with the health department. We all know the health department does not 309 00:25:09,600 --> 00:25:18,000 operate on a break even or a surplus which both of those I guarantee you are 310 00:25:14,960 --> 00:25:22,559 you know of some level important of equal importance. 311 00:25:20,080 --> 00:25:26,400 » Um you know I I really do think we would be the minimum is a great number if 312 00:25:24,880 --> 00:25:31,440 we're doing 100 bucks is a minimum. I think it's very reasonable. U most 313 00:25:30,400 --> 00:25:35,520 » Am I done talking? >> Yes. [laughter] 314 00:25:33,919 --> 00:25:39,760 » Whatever the board decides Yeah. >> We'll make work. And I I think we can 315 00:25:37,520 --> 00:25:42,799 also address the retention needs of this building department as well as we do 316 00:25:41,120 --> 00:25:46,720 this. >> Yeah. So, um if if you're going to be 317 00:25:45,520 --> 00:25:49,600 changing anything here, I'd just like to see the numbers first. 318 00:25:47,840 --> 00:25:54,080 » Well, it How does everyone else feel about that? That's one person's opinion. 319 00:25:52,159 --> 00:25:59,440 » I think so. We do know one solid number and that's going from five to six, which 320 00:25:56,400 --> 00:26:03,000 is a $71,000 increase. So, that's I don't know. These are 321 00:26:03,440 --> 00:26:13,200 » There you go. So going from five to six creates another a new $71,000. 322 00:26:09,120 --> 00:26:17,440 Okay. Now that is is that including the additional $75 flat fee number or is 323 00:26:15,600 --> 00:26:22,159 that just the five to six? >> Just the five to6. 324 00:26:18,640 --> 00:26:27,120 » So just the five to six. Okay. And then in addition to that flat fee is 325 00:26:24,480 --> 00:26:33,840 producing 49. Now, we're not taking that $49,000 326 00:26:29,039 --> 00:26:38,320 and making it uh zero because as and I'm not using the number that Mr. Mars has 327 00:26:36,080 --> 00:26:39,679 used. He said 20% of those permits are hitting the minimum. 328 00:26:39,120 --> 00:26:44,799 » Right. >> Right. So, out of that 655 329 00:26:42,799 --> 00:26:49,919 100 times 20 time 6 is about 30. I mean, you know, 330 00:26:47,279 --> 00:26:55,248 you're still getting another five $6,000 right on top of that 71. So the so just 331 00:26:53,520 --> 00:27:00,720 interjecting [clears throat] the current annual 332 00:26:57,360 --> 00:27:08,400 operating cost based on four years of um four years of averages is $432,000. 333 00:27:05,279 --> 00:27:15,880 That's the annual operating cost. The current average annual revenue based on 334 00:27:11,279 --> 00:27:15,880 those same four years is $358,000. 335 00:27:15,919 --> 00:27:29,360 If you bring in the permit fee of 61,000 just that it could potentially uh based 336 00:27:24,480 --> 00:27:33,120 on averages bring us up to 4296 >> which would still fall short from the 337 00:27:31,600 --> 00:27:37,679 432. >> That's not counting the minimum of 100 338 00:27:35,440 --> 00:27:41,360 though >> and the three and a half. Well, 339 00:27:39,440 --> 00:27:49,679 » I mean I mean based on that we we currently have a minimum of 25 up to 340 00:27:46,159 --> 00:27:53,919 5,000. So if we did a minimum of 100 up to a th00and, I couldn't do the math off 341 00:27:52,080 --> 00:28:00,640 the top of my head, but I mean I feel like that would increase by another, you 342 00:27:56,720 --> 00:28:04,559 know, four or 5%, which is, you know, maybe maybe four four or five% versus 343 00:28:03,760 --> 00:28:06,880 the >> So about 16 more grand. 344 00:28:06,480 --> 00:28:09,039 » Yeah. >> So that would put us in a surface at 345 00:28:08,559 --> 00:28:14,320 that point. >> It would it would put us in a surplus. 346 00:28:10,720 --> 00:28:16,960 the the additional $75 fee would fix. 347 00:28:15,600 --> 00:28:19,960 » Yeah, it would it would add an additional 348 00:28:21,840 --> 00:28:32,960 » 716 which I think was about 14%. Another 14%. Yeah. [snorts] 349 00:28:29,440 --> 00:28:37,360 » I have a question. If we're thinking about going up from 75 350 00:28:35,440 --> 00:28:42,159 to 100, do we have to have another public hearing? 351 00:28:39,520 --> 00:28:42,159 » Maybe. 352 00:28:43,440 --> 00:28:48,320 It could >> because it's higher than what was 353 00:28:46,159 --> 00:28:50,640 posted. >> That is correct. 354 00:28:49,200 --> 00:28:54,960 » Yeah. >> I mean, it's correct that it's higher 355 00:28:52,080 --> 00:28:59,279 than it was posted. Um, yeah, I would have to check to see on 356 00:28:56,880 --> 00:29:03,559 that because that does apply for taxes, but I'm not sure it applies to fees. 357 00:29:05,760 --> 00:29:08,925 » That's a valid question. [snorts] 358 00:29:11,520 --> 00:29:19,360 All right. Well, based on not knowing that, I guess we have to defer vote if 359 00:29:16,559 --> 00:29:27,399 the consensus is 100 flat fee. >> No, it was a consensus of 100 minimum 360 00:29:21,760 --> 00:29:27,399 and no flat fee is was I was 361 00:29:29,279 --> 00:29:33,880 » thoughts. It's fine. 362 00:29:35,360 --> 00:29:39,200 » I'm just going to put it out there. I'm disgruntled. We're not voting on this 363 00:29:37,679 --> 00:29:43,600 tonight. [clears throat] >> Yes, you are. [laughter] But that being 364 00:29:41,679 --> 00:29:49,120 said, I don't think that we're up against a hard enough deadline that 365 00:29:46,399 --> 00:29:53,120 voting in September is a problem. >> We we have also announced to the home 366 00:29:50,960 --> 00:29:56,720 builders association that it is underway. So, it's not [snorts] as if 367 00:29:55,120 --> 00:29:59,919 the homebuilders aren't expecting something to happen. 368 00:29:57,600 --> 00:30:05,760 » All right, we're deferring vote. We'll move on to ordinance 02026-04 369 00:30:03,440 --> 00:30:08,480 amendments chapter 6 licenses permits business regulations article one in the 370 00:30:07,679 --> 00:30:14,480 general. >> So just to be clear um in preparation 371 00:30:11,679 --> 00:30:18,480 for next month um you'd like to see some numbers on what the $100 minimum 372 00:30:17,600 --> 00:30:20,080 » minimum yes >> would generate. 373 00:30:19,360 --> 00:30:26,000 » Yeah. >> And whether we need 374 00:30:22,000 --> 00:30:30,200 » another public hearing or not. >> Okay. We will. 375 00:30:34,559 --> 00:30:42,039 All right. We'll move on to second public hearing tonight on ordinance 376 00:30:39,039 --> 00:30:42,039 2026-4. 377 00:30:44,880 --> 00:30:52,320 Okay. And this has to do with licenses, permits, and business regulations um 378 00:30:50,799 --> 00:30:57,000 related to fees for inspection of amusement devices and permits. 379 00:30:57,520 --> 00:31:06,159 Okay. So, for amusement device fees, um, nonprofit organizations remain exempt 380 00:31:03,039 --> 00:31:11,120 from the fee schedule. So, the original fees are shown on the left, proposed 381 00:31:08,240 --> 00:31:20,720 fees shown on the right. The kitty fee would go from $15 to $55. 382 00:31:15,840 --> 00:31:26,880 A the major ride from $25 would um be more broken out into a circular flat 383 00:31:23,200 --> 00:31:34,399 ride of less than 20 ft would be $75. Spectacular ride would go from $45 to 384 00:31:30,799 --> 00:31:41,600 $100. Um there's a new zipline fee of $150 each. A new coaster greater than 30 385 00:31:38,240 --> 00:31:48,640 ft of $200. a new coaster greater than 60 feet to $400. 386 00:31:44,880 --> 00:31:55,840 There would be an annual permit um fee that would go from $25 per device. Um 387 00:31:53,039 --> 00:32:00,880 the annual permit would be $0. We would remove that and then add a new 388 00:31:58,080 --> 00:32:04,919 reinspection fee of half the regular inspection fee for each. 389 00:32:05,519 --> 00:32:11,720 And then we also added the state code definition of a movement device. 390 00:32:12,240 --> 00:32:18,880 And those are pretty much all of those changes. So happy to answer any 391 00:32:16,159 --> 00:32:20,880 questions before you conduct the public hearing. 392 00:32:19,360 --> 00:32:25,600 » Are we expecting a roller coaster anytime soon? 393 00:32:22,480 --> 00:32:30,720 » Massiey's million. >> So that's my my seriously though my 394 00:32:27,519 --> 00:32:33,760 question is where do we see these fees being implement? I mean, what's an 395 00:32:32,320 --> 00:32:36,240 example of where this might come into play? 396 00:32:34,880 --> 00:32:39,679 » That I can't answer because the only one I know of is the mass 397 00:32:37,760 --> 00:32:42,679 » and that's nonpro can answer that question. 398 00:32:44,480 --> 00:32:53,679 » Did you go back to the >> Yeah. So, so 399 00:32:50,399 --> 00:32:57,000 » yeah. So, annual permit. 400 00:32:58,320 --> 00:33:03,519 I mean, I could see a zip line up the winter green, you know, one them putting 401 00:33:02,080 --> 00:33:06,480 in a zip line or something like that, maybe. 402 00:33:04,080 --> 00:33:08,320 » Yeah. Is that for your backyard, too, though? 403 00:33:06,720 --> 00:33:12,640 » There's actually some new language about that to where we're not going to be 404 00:33:10,640 --> 00:33:16,320 going to um 405 00:33:14,559 --> 00:33:21,200 wintergreen for their snow tube and things of that nature because they are 406 00:33:18,640 --> 00:33:25,600 um exempt from the amusement device regulation. It's going to save our 407 00:33:22,399 --> 00:33:32,320 department quite a bit of liability and time and personnel. 408 00:33:27,919 --> 00:33:36,320 etc. And they will be um through because of you know through the Virginia music 409 00:33:33,840 --> 00:33:41,039 device regulations uh they will simply just have their inspections done by 410 00:33:38,880 --> 00:33:44,880 their insurance company like every other snowing device. That said, there are 411 00:33:43,440 --> 00:33:50,320 things up there such as the rock climbing wall, um the Ninja Warrior 412 00:33:48,159 --> 00:33:55,200 course, and some other things uh that fall into this. So, uh, really the new 413 00:33:53,679 --> 00:33:58,640 zip line, the new coaster, and the new coaster, while they seem kind of comical 414 00:33:57,039 --> 00:34:03,200 right now while we're looking at them, it really just kind of lines us up for 415 00:34:01,440 --> 00:34:10,960 anything that may happen in the future. These are fees that are um kind of I 416 00:34:06,960 --> 00:34:16,560 mean, they are typical in these types of fees. Uh, they fall 417 00:34:14,000 --> 00:34:22,560 this list falls directly from the uh Virginia Ausement Device Regulation FE 418 00:34:18,560 --> 00:34:28,399 chart. Those numbers are the numbers that can be charged uh from that chart. 419 00:34:25,359 --> 00:34:36,879 And really all I'm attempting to do is update this section of our fee addendum 420 00:34:32,079 --> 00:34:44,399 to match current 2026 law so that in 2036 we will still not be behind the 421 00:34:39,839 --> 00:34:48,320 power curve 26 years 20 30 probably 30 some years like we are uh right now. 422 00:34:46,800 --> 00:34:54,159 There's even some language change in here that had to be changed from the old 423 00:34:51,520 --> 00:35:00,000 regulations to the new regulations. Uh but again, this is right in line with 424 00:34:57,359 --> 00:35:05,280 all of the other localities. I want to make sure that like Candy said, the 425 00:35:02,400 --> 00:35:12,640 nonprofits will not be affected. Uh so our annual um 426 00:35:09,280 --> 00:35:16,800 uh Routin Club and Rockfish Valley Fire Department are both nonprofits. They're 427 00:35:14,720 --> 00:35:23,119 not going to be affected by this. Uh this is more along the lines of if new 428 00:35:19,920 --> 00:35:28,240 people come in or some type of business that we are unaware of. I mean, we are 429 00:35:25,680 --> 00:35:33,599 we are in some I don't say weird times, but we're in some fast-paced growing 430 00:35:30,880 --> 00:35:37,119 people have the knowledge in their pocket, the world's knowledge in their 431 00:35:34,960 --> 00:35:41,520 pocket, AI, they can I mean people are coming up with all kinds of things and 432 00:35:38,480 --> 00:35:46,320 people have come into my office, Sony's office, and even said, "Hey, I'm 433 00:35:44,640 --> 00:35:50,000 proposing I'm just thinking about an amusement park. I'm thinking about this. 434 00:35:47,920 --> 00:35:54,000 I'm thinking about that." And you know those kind of things to me go oh my gosh 435 00:35:52,640 --> 00:35:57,680 like we don't want to be behind the power curve if somebody comes in here 436 00:35:55,839 --> 00:36:02,000 and actually does fill out an SVP or something for fill in the blank. Right. 437 00:36:00,800 --> 00:36:07,280 The building department wants to be prepared for those things. 438 00:36:04,079 --> 00:36:13,400 » Okay. Any other questions? All right. We're going to open up a 439 00:36:08,800 --> 00:36:13,400 public hearing for ordinance 02026-04. 440 00:36:15,040 --> 00:36:24,240 We have no one signed up. Is there anyone that just has a burning desire? 441 00:36:21,440 --> 00:36:31,599 All right. Hearing none, we're closing public hearing for ordinance 0206-04. 442 00:36:29,359 --> 00:36:35,920 Any discussion? >> That's good out. It's ramping you up. 443 00:36:34,400 --> 00:36:41,800 » I will entertain a motion. >> Madam Chair, I move that we approve 444 00:36:37,920 --> 00:36:41,800 ordinance 02026-4 445 00:36:42,640 --> 00:36:47,200 as presented. Second. 446 00:36:45,760 --> 00:36:50,640 » All right. I have a motion and a second. Any discussion? 447 00:36:49,119 --> 00:36:52,960 Candy, would you like to do a roll call vote? 448 00:36:51,520 --> 00:36:54,000 » Yes. Mr. Bar? >> Yes. 449 00:36:53,359 --> 00:36:55,359 » Mr. Reed? >> Yes. 450 00:36:54,480 --> 00:36:56,400 » Mr. Rutherford? >> Yes. 451 00:36:55,599 --> 00:36:58,000 » Mr. Lahan? >> No. 452 00:36:57,119 --> 00:37:01,000 » Dr. Lincoln? >> Yes. 453 00:37:01,359 --> 00:37:07,680 » You know, you joke about the coaster thing, but didn't mass not a roller 454 00:37:06,000 --> 00:37:11,280 coaster, but one of those. It's almost like you sit down on a thing and you're 455 00:37:09,440 --> 00:37:12,640 on a track. One of those type of coasters. 456 00:37:11,760 --> 00:37:15,680 » A mountain coaster. >> Yeah, a mountain coaster. 457 00:37:13,839 --> 00:37:18,800 » I'd ride that. I think I think they just put open one more maybe. 458 00:37:18,240 --> 00:37:24,320 Anyway, >> uh ordinance 2026-05 459 00:37:21,119 --> 00:37:27,320 amendments chapter 9 appendix A fees. Okay, 460 00:37:27,760 --> 00:37:32,800 this ordinance is pertaining to a version of sediment control and land 461 00:37:31,200 --> 00:37:39,359 disturbance. Um the original fees um 462 00:37:37,599 --> 00:37:45,359 were based on complaints and special site visits. Um well these these were 463 00:37:42,880 --> 00:37:50,800 not addressed. proposed fee would impose a new $75 per substantiated complaint 464 00:37:48,880 --> 00:37:57,240 driven or unscheduled site visit that resulted in necessary permitting. So 465 00:37:53,599 --> 00:37:57,240 that's a new fee. 466 00:37:58,880 --> 00:38:04,880 This chart is pertaining to land disturbance inspection fees. The 467 00:38:02,400 --> 00:38:09,760 original fee um at the beginning and end of project was $35. 468 00:38:07,520 --> 00:38:14,480 Proposed fee uh at the beginning and end is $100. 469 00:38:11,599 --> 00:38:20,560 um inspections once every eight weeks would be $100. Once every eight weeks um 470 00:38:17,520 --> 00:38:26,400 is proposed to go to $200. The once every four weeks inspection would be is 471 00:38:23,200 --> 00:38:30,320 $225 and then it's proposed to go to $325. 472 00:38:28,400 --> 00:38:34,680 There's no change to inspection fees for once every two weeks at $450. 473 00:38:36,800 --> 00:38:43,520 And those are all the changes proposed there. 474 00:38:40,800 --> 00:38:47,320 Happy to answer questions on these before the public hearing. 475 00:38:49,040 --> 00:38:56,079 » Any questions? >> All right. Um, you want to do that after 476 00:38:53,839 --> 00:38:59,680 the public hearing? >> Okay. Thank you. 477 00:38:58,240 --> 00:39:05,400 » All right. We're going to open up the public hearing for uh ordinance 478 00:39:02,400 --> 00:39:05,400 02026-05. 479 00:39:07,760 --> 00:39:15,240 No one has signed up. But Mr. Pervvis has something to say. 480 00:39:15,359 --> 00:39:20,880 » Just for the record, state your name and address again. [snorts] 481 00:39:18,720 --> 00:39:28,079 » Pervis 509 shipment, Virginia. And I guess uh my 482 00:39:26,000 --> 00:39:32,079 what's spinning in my head here, you know, I know that that we're we're 483 00:39:29,680 --> 00:39:36,880 raising uh fees and everything, but we've got these guys employed. We're 484 00:39:34,000 --> 00:39:42,720 paying them a salary for whatever it is for eight hours a day. And if they're if 485 00:39:40,960 --> 00:39:46,800 if that's part of their job and they're going out and doing doing these 486 00:39:44,960 --> 00:39:51,119 inspections, if they're not doing these inspections, they're they're sitting at 487 00:39:48,240 --> 00:39:56,400 the office. And I know we have expenses in getting to and from a job. I 488 00:39:53,680 --> 00:40:00,320 understand that. But on all of not just the the land disturbance but on the 489 00:39:58,640 --> 00:40:05,680 other permits that I commented on before. Um you know there there is 490 00:40:03,200 --> 00:40:09,040 paperwork that has to be done but they're they're they're in the you know 491 00:40:07,440 --> 00:40:15,200 they they're in the office for eight hours a day and that's kind of their job 492 00:40:12,800 --> 00:40:21,440 is somebody has got to pull paperwork. That is somebody's job. So my question 493 00:40:18,640 --> 00:40:27,920 is and I understand that there you know here again you know salaries and and 494 00:40:24,880 --> 00:40:33,119 vehicles and all this other things but I but at the same time you know we're 495 00:40:30,480 --> 00:40:38,240 paying each of these guys a salary for for the work that they're doing and then 496 00:40:35,440 --> 00:40:45,520 we're charging that's already there and then we want to add additional fees on 497 00:40:41,200 --> 00:40:50,320 top of of that to substantiate other things. I that just doesn't quite sit 498 00:40:48,000 --> 00:40:54,880 real well with me. And I know, like I said, I know that everybody has cost 499 00:40:52,880 --> 00:40:59,760 increase. I mean, if you're in any kind of business, things go up. Gas is more 500 00:40:57,680 --> 00:41:04,160 expensive and everything, but when it comes to pulling paperwork and, you 501 00:41:02,240 --> 00:41:09,119 know, doing fees, we've got we've got some they've got somebody in there that 502 00:41:06,319 --> 00:41:14,240 that takes the permit fee and you fill out the form, you hand it to them, and 503 00:41:11,040 --> 00:41:20,400 that's their job. So, I just wonder why why do we need to increase the fees? 504 00:41:18,640 --> 00:41:25,200 Do y'all get my drift on what I'm saying? On top of of I mean, we've 505 00:41:23,680 --> 00:41:30,160 already paying them a salary. They've got to be doing they they've been 506 00:41:26,880 --> 00:41:37,520 operating under those guidelines for all these years. And now we're just adding 507 00:41:32,960 --> 00:41:43,280 more and more uh fees, which here again is is passed right on down the line. And 508 00:41:40,720 --> 00:41:47,280 it's uh you know it affects it affects everything. Affects anybody that's in 509 00:41:45,280 --> 00:41:52,880 business as a builder. He's got to add those fees into his cost of building 510 00:41:50,480 --> 00:41:56,960 which is transferred right to the buyer which you know we want you know we're 511 00:41:54,640 --> 00:42:01,839 trying to the big push for affordable housing. Well every time we raise a fee 512 00:41:59,440 --> 00:42:06,359 it makes it that much more unaffordable. That's basically 513 00:42:03,119 --> 00:42:06,359 » Thank you. 514 00:42:08,079 --> 00:42:14,760 » Anyone else? I'm going to close public hearing. 515 00:42:16,720 --> 00:42:22,520 Candy, remind me again what sort of deficit we're in 516 00:42:23,359 --> 00:42:27,079 » with the building department. 517 00:42:34,400 --> 00:42:46,359 The FY27 operational budget is 433 366 >> and we brought in 300 something. 518 00:42:41,760 --> 00:42:46,359 » Current average annual revenue is 358. 519 00:42:47,040 --> 00:42:53,119 » We're almost there. Going to six and then all these roller coasters. 520 00:42:51,680 --> 00:42:58,359 » Oh no, we didn't vote on that. We're still at five. 521 00:42:54,400 --> 00:42:58,359 » We'll probably six. 522 00:42:59,040 --> 00:43:04,400 Yeah. The the other thing I'd like to say about this is that there there was 523 00:43:02,560 --> 00:43:08,319 mention at the earlier on in the earlier 524 00:43:05,599 --> 00:43:13,680 proposal to maybe you know do something incremental and look at it again. Um I 525 00:43:11,760 --> 00:43:18,880 don't think that does a service to anybody to have to come back when you 526 00:43:17,280 --> 00:43:22,480 know we know cost of living and and inflation are going to happen. We know 527 00:43:20,800 --> 00:43:25,200 we need to be prepared for that. We don't want to have to come back and try 528 00:43:23,760 --> 00:43:29,760 to make it up which is the position we're in now. And um and you want the 529 00:43:28,560 --> 00:43:35,520 building community to know what to expect. you know, you don't want to be, 530 00:43:32,480 --> 00:43:42,560 you know, sitting here again every, you know, two, three years to to increase 531 00:43:38,880 --> 00:43:46,800 fees that, you know, on the one hand, you know, they're significant. They 532 00:43:44,079 --> 00:43:51,440 aren't substantial. And, uh, you know, the costs of, 533 00:43:49,119 --> 00:43:54,800 um, you know, of of keeping a quality building department, having them be 534 00:43:53,520 --> 00:44:00,640 where they need to be when they need to be there, and showing them the level of 535 00:43:57,280 --> 00:44:04,319 support that they certainly deserve. Um, I'm certainly in favor of that. And the 536 00:44:03,040 --> 00:44:07,920 other thing is is that if we don't have enough money to cover what happens in 537 00:44:06,079 --> 00:44:11,839 building inspections, where do we end up? 538 00:44:09,200 --> 00:44:14,640 » We end up looking at the biggest, you know, uh, expense that we have is the 539 00:44:13,839 --> 00:44:19,280 schools >> and we end up, you know, doing what we 540 00:44:17,359 --> 00:44:23,040 can based on what we have proposed in terms of taxes to be able to get the 541 00:44:21,119 --> 00:44:28,560 schools what they want. But if we don't have a sustainable, you know, economic 542 00:44:26,560 --> 00:44:33,599 situation with our other departments, then you're always looking at, 543 00:44:32,160 --> 00:44:38,720 you know, the schools looking like the bad guy in terms of revenues when it's 544 00:44:36,000 --> 00:44:42,640 actually built into other places. Kind of defers that. 545 00:44:40,000 --> 00:44:47,599 » All right. Anybody have any comments on the land 546 00:44:45,119 --> 00:44:52,079 disturbance ordinance? >> U Madam Chair? 547 00:44:49,040 --> 00:44:56,960 » Yes. Um I I have no protest with this change in fees. Uh generally this is a 548 00:44:54,160 --> 00:45:01,760 good good change. Yeah 100 bucks it's reasonable. Um you still have the uh I 549 00:45:00,240 --> 00:45:06,319 guess you have the agreements in lie of ENS plans of course and this just allows 550 00:45:04,400 --> 00:45:10,240 for the typical inspections to be done. I think this will probably and do we 551 00:45:08,880 --> 00:45:14,960 have a number of how much this will increase because this should apply to at 552 00:45:11,680 --> 00:45:17,680 least 50% of our 655 permits. 553 00:45:16,319 --> 00:45:22,319 » Yes. So >> that's that's a pretty big jump. 554 00:45:20,240 --> 00:45:27,040 » Yeah. So while while it does appear to be while it does appear to be a 555 00:45:25,200 --> 00:45:33,359 significant increase, land service permits only make up about 556 00:45:29,920 --> 00:45:41,440 I'd say 5% of our permits or less. And uh so I mean we're and and they fall 557 00:45:36,560 --> 00:45:44,640 into low uh I say low maintenance and high 558 00:45:42,960 --> 00:45:50,400 maintenance but essentially what I mean is uh you know some of them Renaissance 559 00:45:47,920 --> 00:45:55,920 Ridge up mountain some things like that um there's no way we'll ever break even 560 00:45:53,520 --> 00:46:03,119 on those is you know the personnel power that goes into just consistent 561 00:45:59,440 --> 00:46:08,960 nonstop all week long talking to people every day for your requests, site 562 00:46:05,920 --> 00:46:13,680 visits, complaints, just non-stop. And then uh but your typical but your 563 00:46:10,560 --> 00:46:17,599 typical one falls into these categories, right? Uh your typical one is uh you 564 00:46:15,839 --> 00:46:21,680 know like if it falls in we have a scoring chart and if it falls into this 565 00:46:20,000 --> 00:46:29,680 specific scoring chart where the land's super flat, no roadways, no property 566 00:46:24,880 --> 00:46:33,599 lines, uh no um waterways etc. uh vertical slope etc. you know, it's just 567 00:46:31,440 --> 00:46:37,440 it falls into a scoring category where it's wants to begin, wants to end super 568 00:46:35,920 --> 00:46:40,440 low. Um, 569 00:46:40,880 --> 00:46:49,520 problematic. U so you know that $100 really takes 570 00:46:45,440 --> 00:46:52,560 into account the taking in of the uh permit applications and then the 571 00:46:51,040 --> 00:46:59,680 processing of the permit applications and then the review of the uh 572 00:46:58,240 --> 00:47:04,240 well you know there's there's a lot of administrative parts but this portion of 573 00:47:02,240 --> 00:47:08,640 it is more along the lines of the associated fee that where an inspector 574 00:47:06,079 --> 00:47:14,079 is going to have to go out um you know essentially just man cow personnel hours 575 00:47:11,040 --> 00:47:19,440 averaged from You know, it it may be in shipment and that would be great, but it 576 00:47:16,880 --> 00:47:23,440 also may be at the top of Spyro Yakap where we currently have two or three or 577 00:47:21,680 --> 00:47:29,440 on Chicken Hollow where it takes literally almost an hour just to get to 578 00:47:26,480 --> 00:47:33,760 that location to do the inspection and then turn around and and go to a 579 00:47:31,440 --> 00:47:37,680 different location. I would also like to address 580 00:47:35,280 --> 00:47:43,920 comment earlier. Uh there is no one sitting in our office doing nothing. 581 00:47:40,880 --> 00:47:47,760 Everyone's I didn't just I I didn't mean to imply he did. I just want to make 582 00:47:45,440 --> 00:47:53,200 sure that I go on record saying that these cars are moving non-stop. These 583 00:47:50,480 --> 00:47:57,520 inspectors are inspecting non-stop there. There's a serious workload in the 584 00:47:55,839 --> 00:48:03,440 building department. I just want to make sure that that is conveyed to everyone. 585 00:48:00,240 --> 00:48:07,440 » Am I wrong in assuming that there's also classes DEQ dealing with DEEQ things 586 00:48:06,000 --> 00:48:13,200 like that when you're dealing with sediment and all that jazz? So it takes 587 00:48:10,000 --> 00:48:17,359 another exceptional level of knowledge to deal with this particular issue. 588 00:48:15,839 --> 00:48:21,200 » Therefore, it costs more money. >> You have to be certified as an 589 00:48:19,119 --> 00:48:25,599 inspector. You have to be certified as a plans examiner. You have to be certified 590 00:48:22,800 --> 00:48:30,480 as a program administrator. >> All right. Any more questions? 591 00:48:27,760 --> 00:48:35,200 » Yes. On the complaint driven, is there a limit? Like can somebody call in every 592 00:48:33,200 --> 00:48:38,319 day for that $75 fee? >> Yeah. No. if it's substantiated and 593 00:48:37,200 --> 00:48:42,000 you've already been out there, you've already talked to the person. So, let's 594 00:48:39,520 --> 00:48:47,040 say John Smith is doing something that is um you know that would require a land 595 00:48:45,520 --> 00:48:52,319 disturbance permit whether they're doing it egregiously or they just didn't know 596 00:48:50,079 --> 00:48:57,200 regardless of their neighbor calls and they say, "Hey, my neighbor John Smith, 597 00:48:54,960 --> 00:49:01,680 I think they need a fill in the blank." Okay, we go out there. If they don't, 598 00:48:59,839 --> 00:49:06,079 then there's no fee involved. Hey John, you're doing you're well within the 599 00:49:03,839 --> 00:49:09,280 boundaries and guidelines parameters of not needing this. These are the 600 00:49:07,680 --> 00:49:14,160 parameters. Please don't go outside of them. Also, you know, talk to them about 601 00:49:11,680 --> 00:49:17,760 the neighbor, the waterway, the everything. Uh but if they don't fall 602 00:49:16,160 --> 00:49:22,640 into those regulations, then they don't need it. But now, let's say they do need 603 00:49:19,839 --> 00:49:26,079 it. Okay. Well, it's substantiated. We're going to talk to John Smith and 604 00:49:24,640 --> 00:49:31,599 John Smith's going to stop what he's doing or come in immediately following 605 00:49:29,599 --> 00:49:36,319 the next day, etc. We're going to work it out. We're going to stop 606 00:49:34,079 --> 00:49:40,319 unless it's something really bad. It's it's an amicable agreement between us 607 00:49:38,800 --> 00:49:43,920 and John Smith. John Smith comes in, gets all this permitting, 608 00:49:42,400 --> 00:49:49,359 and then we move forward with the process. Let's say 609 00:49:46,480 --> 00:49:54,720 six people call in. It's still just one. It's one fee. It's one visit to John. 610 00:49:52,000 --> 00:49:59,200 Now, let's say John doesn't come in. Let's say John Smith is like, "Yeah, I 611 00:49:56,960 --> 00:50:02,960 got you, buddy." And then just keeps on doing what he's doing. And then, okay, 612 00:50:01,119 --> 00:50:07,040 well, John didn't show up today. Now, I got to go back out there. Well, now 613 00:50:04,640 --> 00:50:10,000 that's another substantiated cycism, right? Hey, John, what happened? Where 614 00:50:08,720 --> 00:50:13,599 you coming? You said you were going to come in again. And then, oh, I'll come 615 00:50:11,920 --> 00:50:16,559 in tomorrow. And then they don't come in again. 616 00:50:14,559 --> 00:50:19,920 » And then they won't answer phone calls. >> And now it's another substantiated site. 617 00:50:18,240 --> 00:50:23,760 You see what I'm saying? Like it's it's personnel power going back and forth. 618 00:50:21,839 --> 00:50:26,480 » It encourages people to do what they're supposed to do. 619 00:50:24,800 --> 00:50:30,400 » Right. Right. We don't want to use it for bad, but we also don't want to 620 00:50:28,480 --> 00:50:35,599 continue to have to >> go out there and spend the taxpayer 621 00:50:33,119 --> 00:50:38,800 dollars because John Smith doesn't want to do what he wants to do. 622 00:50:36,720 --> 00:50:42,559 » There there does come at one point it does become a misdemeanor charge. 623 00:50:40,880 --> 00:50:46,640 » Yeah. That that would be about the second or third visit. We don't want to 624 00:50:44,480 --> 00:50:51,119 go out there and just start slapping those down. But if But if anyone at All 625 00:50:49,280 --> 00:50:54,720 Smith doesn't want to cooperate, there are legal avenues to to go. We we 626 00:50:54,079 --> 00:50:58,800 haven't >> we haven't had to do that. We are we're 627 00:50:57,440 --> 00:51:03,359 a very good building department. We're filled with really good uh people who 628 00:51:01,359 --> 00:51:07,440 know how to communicate. So, you know, we're pretty solid right now. 629 00:51:04,720 --> 00:51:11,280 » Any other questions for Jeremy? [snorts] >> No. All right. I'll [clears throat] 630 00:51:09,760 --> 00:51:14,640 » entertain a motion. >> Uh Madam Chair, I move we approve 631 00:51:12,720 --> 00:51:16,000 ordinance 02026-05 as presented. 632 00:51:15,440 --> 00:51:21,280 » Okay. >> Second. I have a motion and a second. 633 00:51:18,240 --> 00:51:25,200 Any discussion? Would you like to roll call vote? 634 00:51:24,079 --> 00:51:26,640 » Candy. >> Mr. Lan. 635 00:51:26,240 --> 00:51:27,839 » Yeah. >> Mr. Rifford. 636 00:51:27,440 --> 00:51:28,960 » Yes. >> Mr. Reed. 637 00:51:28,559 --> 00:51:30,720 » Yes. >> Mr. Parr. 638 00:51:29,599 --> 00:51:34,480 » Yes. Dr. >> Yes. 639 00:51:32,945 --> 00:51:40,000 [clears throat] >> All right. Amendment of the FI2026 2027 640 00:51:38,160 --> 00:51:44,920 budget that exceeds the statutory limit of the 1% 641 00:51:41,920 --> 00:51:44,920 R2026-71. 642 00:52:01,110 --> 00:52:03,130 » [sighs] 643 00:52:06,160 --> 00:52:13,079 » This is our FY27 budget amendment hearing. 644 00:52:13,359 --> 00:52:21,920 Just a little background, we have three items. Item one, on June 645 00:52:19,680 --> 00:52:27,440 9th, 2026, the board of supervisors voted to approve resolution R2650 646 00:52:25,599 --> 00:52:33,839 ratifying the pre-auction property purchase contract for acquisition of 683 647 00:52:30,400 --> 00:52:38,440 acres in Livingston, Virginia property for a total purchase price of 8,925,000. 648 00:52:38,720 --> 00:52:49,680 Item two, the ban 2022 bond anticipation note principal balance of $2,600,000 649 00:52:47,200 --> 00:52:54,960 is due in August 2027 for the other piece of park and property purchased in 650 00:52:51,760 --> 00:53:00,640 2022. This amount may be refinanced in conjunction with financing of item one. 651 00:52:58,160 --> 00:53:05,119 Item number three. During the joint meeting with the Nelson County Service 652 00:53:02,000 --> 00:53:10,000 Authority on June 30th, 2026, the board of supervisors agreed by consensus to 653 00:53:07,359 --> 00:53:16,640 provide a loan to NCSA for Wintergreen Wastewater Treatment Plant DEEQ consent 654 00:53:12,640 --> 00:53:22,079 order costs in the amount of $3,100,000. The 3.1 million is a maximum figure and 655 00:53:19,839 --> 00:53:25,440 the actual final amount may be less. These funds remain as part of the 656 00:53:23,599 --> 00:53:33,240 general fund balance until they are expended and will be dispersed to NCSA 657 00:53:28,480 --> 00:53:33,240 on an as needed requested basis. 658 00:53:36,400 --> 00:53:43,119 We are holding a public hearing tonight on the proposed FY27 budget amendment 659 00:53:40,640 --> 00:53:46,559 for state code section 15.2-2507 -2507 660 00:53:44,880 --> 00:53:50,400 which says that any budget amendment which exceeds 1% of the total 661 00:53:48,640 --> 00:53:54,960 expenditure shown in the currently adopted budget must be accomplished by 662 00:53:52,880 --> 00:53:58,319 publishing a notice of the meeting and a public hearing in accordance with 663 00:53:56,319 --> 00:54:02,559 section 15.2-1427 1427 and the board may adopt the 664 00:54:00,880 --> 00:54:07,160 amendment at the advertised meeting following conduct of public hearing. 665 00:54:10,480 --> 00:54:19,359 On July 14th, 2026, the board of supervisors authorized a public hearing 666 00:54:15,119 --> 00:54:23,880 pursuant to state code section 15.2-2507 via adoption of resolution R2026-563. 667 00:54:24,400 --> 00:54:31,760 Budget amendment public hearing notice was published in July 23rd, 2026 and 668 00:54:29,040 --> 00:54:38,079 July 30th, 2026 editions of the Nelson County Times. 20 days and 13 days notice 669 00:54:35,119 --> 00:54:45,000 prior to the BOS public hearing date. Total expenditures shown in the 670 00:54:39,760 --> 00:54:45,000 currently adopted budget are 87,445,150. 671 00:54:46,079 --> 00:54:54,920 This is the total excluding transfers. So 1% of the total expenditures is 672 00:54:51,920 --> 00:54:54,920 $874,451.50. 673 00:54:56,720 --> 00:55:05,520 Total general fund budget amendment request is 12,25,000 674 00:55:01,839 --> 00:55:10,640 comprised of the 2026 property purchase and the NCSA loan. This total debt 675 00:55:08,240 --> 00:55:16,079 service fund budget amendment request is $2,600,000 676 00:55:12,800 --> 00:55:19,480 for the optional refinancing of the 2022 property purchase. 677 00:55:21,760 --> 00:55:29,280 The general fund appropriations will hit fund balance on the revenue side and 678 00:55:25,680 --> 00:55:34,400 capital outlay and non-epal side. The debt service appropriation 679 00:55:31,440 --> 00:55:40,839 will hit a bond bond proceeds account on the revenue side and bond principal 680 00:55:36,559 --> 00:55:40,839 account on the expenditure side. 681 00:55:43,359 --> 00:55:51,839 So next steps be to conduct the public hearing obtain input from staff if 682 00:55:48,880 --> 00:55:54,839 desire consider adoption of resolution R26-71 683 00:55:55,119 --> 00:56:01,640 and staff recommends consideration of this budget. 684 00:56:02,480 --> 00:56:11,440 » Okay. Any clarifying questions for her before we do public? 685 00:56:07,200 --> 00:56:14,799 » Uh, now we could defer a decision on the 3.1 and the 2.6 million. Correct. 686 00:56:14,319 --> 00:56:18,480 » Correct. >> And what is the time frame needing to 687 00:56:16,640 --> 00:56:23,520 make a decision on those? Well, one of those we don't know quite yet. 688 00:56:21,760 --> 00:56:28,720 » Such as the winter waste water treatment facility. What about the refinance? So 689 00:56:27,040 --> 00:56:33,200 refinancing, you should have a decision on that at the September meeting once 690 00:56:30,960 --> 00:56:36,000 the financing options are presented to you when you decide what course of 691 00:56:34,559 --> 00:56:41,440 action you want to take. >> Um but um 692 00:56:39,200 --> 00:56:46,480 I think Mr. Payne said earlier that typically deferral would be up to a year 693 00:56:44,559 --> 00:56:50,480 » to make a decision but doesn't sound like we'll need that much time. 694 00:56:48,720 --> 00:56:56,200 » I was just that would be my only suggestion. 695 00:56:51,839 --> 00:56:56,200 » We are going to perform. Yes. 696 00:56:57,599 --> 00:57:02,640 Thank you. >> So on the 2.6 we would be deferring 697 00:57:00,720 --> 00:57:05,680 paying interest only on the 2.6. >> No, we're deferring 698 00:57:03,920 --> 00:57:08,240 » the whole thing essentially >> on the whole thing 699 00:57:06,799 --> 00:57:09,760 » until we get our financing. >> Yes. 700 00:57:08,559 --> 00:57:15,680 » Okay. Yes. >> This is part of the process. 701 00:57:12,240 --> 00:57:21,839 » Okay. Um we are going to open the public hearing for resolution R2026-71 702 00:57:19,119 --> 00:57:27,640 amendment of the FI26 27 budget. 703 00:57:24,240 --> 00:57:27,640 Mr. Bane 704 00:57:30,579 --> 00:57:32,599 [clears throat] 705 00:57:37,920 --> 00:57:47,200 Steven Bane [clears throat] Steven Bane 624 Nellis Ford. This has been a very 706 00:57:44,000 --> 00:57:53,119 difficult budget for FY27. And now there is the question of whether 707 00:57:49,040 --> 00:58:00,160 to amend the FY27 budget in August or maybe later [clears throat] with three 708 00:57:55,680 --> 00:58:05,440 transactions totaling $14.6 million. In terms of amending the budget 709 00:58:03,119 --> 00:58:09,520 in terms of financial management, it would be better to leave the 710 00:58:06,480 --> 00:58:14,079 transactions as variances since that is what they are. The bigger issue is 711 00:58:12,500 --> 00:58:19,359 [clears throat] the discussion of the transactions themselves. 712 00:58:16,720 --> 00:58:25,520 The service authorities short-term stop gap plan totaling $4.1 million is a 713 00:58:23,119 --> 00:58:30,799 terrible expenditure for Nelson County. It is a waste of money due to unforced 714 00:58:28,079 --> 00:58:37,440 errors. The county has been painted into the corner and that must be addressed. 715 00:58:34,000 --> 00:58:43,040 Nelson County now owns 1,000 acres of Larkin property at a price of $12 716 00:58:40,000 --> 00:58:49,200 million. There's no plan plan for the land and the county paid more than 717 00:58:45,119 --> 00:58:55,040 $12,000 per acre. I believe it is mistake for a government entity to be a 718 00:58:51,599 --> 00:59:00,799 land owner. Period. As evidenced by the earlier purchase of the 300 acres, the 719 00:58:57,760 --> 00:59:06,400 county has the record of kicking the can down the road. The county been paying 720 00:59:03,680 --> 00:59:13,440 interest only, I believe, on the 300 acre purchase since 2022. 721 00:59:09,760 --> 00:59:20,720 That is not sound f uh financial management. Again, the county is painted 722 00:59:16,960 --> 00:59:26,880 into the corner. With the 683 acre property purchase, the unassigned fund 723 00:59:23,680 --> 00:59:31,200 balance for Nelson County will drop to 12.5 million 724 00:59:29,200 --> 00:59:38,079 from the February 25th report from Davenport. This is so much slower than 725 00:59:35,040 --> 00:59:44,400 anything we've seen in the last several years, if not longer. Assuming financing 726 00:59:42,160 --> 00:59:51,040 of [clears throat] the 683 acre property purchase, Nelson County's debt will 727 00:59:47,440 --> 00:59:58,559 spike to $50 million. That should be a cause for concern. Nelson County is 728 00:59:55,040 --> 01:00:03,520 depleting cash and then printing money with more debt. 729 01:00:00,720 --> 01:00:09,280 This should be a wakeup call. I heard recently that it's a good thing that 730 01:00:06,160 --> 01:00:14,720 Nelson County has plenty of debt capacity available. For the board 731 01:00:12,079 --> 01:00:20,559 majority, please don't buy into that center. I heard recently that the county 732 01:00:17,760 --> 01:00:25,359 taxes are too low, attracting people from neighboring counties and the taxes 733 01:00:22,960 --> 01:00:30,960 should be increased. Please don't buy into that sentiment. 734 01:00:27,359 --> 01:00:36,400 What I'm seeing is is is really not fiscal stewardship for Nelson County. 735 01:00:33,520 --> 01:00:42,559 I'm concerned that Nelson County is losing its way. For the board majority, 736 01:00:39,680 --> 01:00:48,446 please use this as a wakeup call on behalf of your constituents. Thank you. 737 01:00:46,426 --> 01:00:48,446 [clears throat] 738 01:00:54,000 --> 01:00:59,040 That's the end of our signup list. Is there anyone else that would like to 739 01:00:57,119 --> 01:01:04,160 speak? All right, hearing none. Just going to 740 01:01:00,559 --> 01:01:07,160 end the public hearing for resolution 2026-71. 741 01:01:08,240 --> 01:01:19,200 Um it was I did speak to Mr. Payne um and it it was a suggestion to defer 742 01:01:16,799 --> 01:01:24,079 um until we knew more information at least on on two of these 743 01:01:22,000 --> 01:01:27,920 um amendments. So, >> and this does not impact the transaction 744 01:01:26,000 --> 01:01:32,880 itself, correct? >> On the purchase of property? 745 01:01:30,559 --> 01:01:37,119 » No, I mean we would ask a board to approve the $8,925,000 746 01:01:36,640 --> 01:01:40,480 piece, >> right? 747 01:01:37,520 --> 01:01:44,240 » And that that would um ensure that the transaction would not 748 01:01:43,440 --> 01:01:50,000 be. >> Got it. So, we just need to approve that 749 01:01:45,760 --> 01:01:57,680 portion and then the other two defer uh in terms of the 750 01:01:54,160 --> 01:02:04,799 In if I was reading the resolution, uh, it would amend it to reflect the 751 01:02:02,000 --> 01:02:09,599 purchase of the Larkin property and deferring the refinance of the 2.6 752 01:02:07,680 --> 01:02:15,079 million and the loan of the Nelson County Service Authority for winter 753 01:02:10,960 --> 01:02:15,079 grade of the 3.1 million. 754 01:02:20,480 --> 01:02:23,760 » That's a motion. If that was you, if you're ready for that, 755 01:02:22,880 --> 01:02:25,280 » I'm ready for that. >> Madame Chair. 756 01:02:24,880 --> 01:02:31,760 » Yes. >> I move that we approve the following 757 01:02:27,760 --> 01:02:38,319 amended resolution of R2026-63 to reflect uh deferring the refinancing 758 01:02:36,160 --> 01:02:43,359 of the 2022 Larkin Property Purchase in the amount of 2.6 million and deferring 759 01:02:41,280 --> 01:02:49,040 the Nelson County Service Authority loan of 3.1 million for the Wintergreen 760 01:02:45,599 --> 01:02:52,799 Wastewater Treatment Plant. >> Second. 761 01:02:50,720 --> 01:02:57,839 Is that clean enough to go? >> He did the correct resolution number. 762 01:02:55,599 --> 01:03:00,960 » R2026-63. No, 71. 763 01:02:58,720 --> 01:03:04,880 » It's 71. >> That one. 764 01:03:02,799 --> 01:03:09,480 That's authorizing the public hearing. >> All right. Um, so 765 01:03:16,400 --> 01:03:21,920 yeah, there we go. All right, that's easy. That's way easier than what I 766 01:03:19,440 --> 01:03:22,880 believe. Uh, Madam Chair, I amend my motion. 767 01:03:22,480 --> 01:03:29,680 » Okay. >> Uh, Madam Chair, I move we approve 768 01:03:26,000 --> 01:03:37,039 resolution R2026-71 uh with just the 8.9 million uh 769 01:03:35,119 --> 01:03:43,280 $8,925,000 for the purchase of the Len property and 770 01:03:39,440 --> 01:03:49,760 deferring the 3.1 million and the 2.6 6 million to uh next month or at a later 771 01:03:47,359 --> 01:03:56,000 date. Second at a later date mean let us know. 772 01:03:53,760 --> 01:04:00,240 » All right. I have a motion and a second. Any discussion? 773 01:03:56,960 --> 01:04:05,200 » Um just just one clarification. Um we don't have to include the 2.6 774 01:04:02,880 --> 01:04:08,960 million in this because that's already current and already being and and we're 775 01:04:07,680 --> 01:04:14,000 already paying on that. >> Yes, that would be an optional 776 01:04:10,400 --> 01:04:17,680 refinancing because that doesn't until >> Okay. So, we can do that at the same 777 01:04:16,079 --> 01:04:22,599 time. >> Yeah. 778 01:04:18,559 --> 01:04:22,599 » Okay. Just checking. Thank you. 779 01:04:23,280 --> 01:04:29,319 » All right. You want to roll call vote, Candy? 780 01:04:33,119 --> 01:04:38,640 » I'm sorry. I'm not used to doing it. [laughter] I did it earlier. Mr. Par. 781 01:04:38,319 --> 01:04:40,880 » Yes. >> Mr. Yes. 782 01:04:39,760 --> 01:04:45,480 » Mr. Yes. >> Mr. Reed. Yes. 783 01:04:42,480 --> 01:04:45,480 » Yes. 784 01:04:45,520 --> 01:04:52,319 » Can I just clarify one thing? Just want um 785 01:04:50,240 --> 01:04:57,520 8,925,000 while is coming out of fund balance will 786 01:04:55,440 --> 01:05:01,520 be returned to fund balance once the financing is complete. Yes. 787 01:04:59,119 --> 01:05:06,280 » So it's a wash in terms of our fund balance. 788 01:05:03,280 --> 01:05:06,280 » Yeah. 789 01:05:13,359 --> 01:05:18,240 We need to >> before the close session, I guess I need 790 01:05:16,480 --> 01:05:22,559 to publicly announce that we are adding a resolution in other business after the 791 01:05:20,400 --> 01:05:25,200 close session um on changing the September meeting just so everybody is 792 01:05:24,799 --> 01:05:28,559 aware. >> After Okay. Yes. 793 01:05:26,880 --> 01:05:30,400 » Um because it's in other business. >> We can do it now if you want. 794 01:05:29,680 --> 01:05:37,359 » You can do it now. >> Okay. All right. Well, uh I'll entertain 795 01:05:33,440 --> 01:05:42,559 a motion on resol resolution 2026-72 then. Madam Chair, I move we adopt 796 01:05:40,000 --> 01:05:48,400 resolution R202672, Nelson County Board of Supervisors rescheduling of the 797 01:05:44,480 --> 01:05:53,760 September 2026 regular meeting from Tuesday, September 8th to September 798 01:05:52,400 --> 01:05:55,760 15th. >> Okay, I have a motion 799 01:05:55,200 --> 01:06:01,520 » second >> and a second. Any discussion? 800 01:05:59,039 --> 01:06:06,160 Hearing none. All those in favor say I. I. 801 01:06:02,160 --> 01:06:10,559 » All those opposed. Excellent. All right. Um, 802 01:06:08,720 --> 01:06:12,640 » do you want to take a break before close session? 803 01:06:11,680 --> 01:06:14,799 » Probably. >> Probably. 804 01:06:13,359 --> 01:06:18,640 » Yeah, [laughter] >> cuz that might be a long one. 805 01:06:16,240 --> 01:06:18,640 » How long?