[0:00] Okay. [0:02] All right. Let's call the meeting for the Florence Urban Renewal Agency to order [0:08] August 26th, 2026. Can we have the roll call, please? [0:11] Yes, of course. Dr. Miller? [0:14] Here. [0:14] Dr. Wantz? [0:15] Here. [0:16] Dr. Ward? [0:17] Here. [0:18] Dr. Meyer? [0:19] Here. [0:19] Director Postgate? [0:20] Here. [0:21] And Chairperson Webb? [0:22] Here. [0:22] And then just for the record, Director Braly, Director Ercolini, and then our [0:27] newest director, Rhonda Kleppinger, are all absent at this meeting, and I'll turn [0:32] it back over to Chairperson Webb. [0:33] Awesome. Thank you very much. Do we have an approval of the agenda? [0:37] Are there any items you'd like to have added? [0:40] I want six to be the first. I'm just kidding. I would move to approve the agenda. [0:45] Do we have a second? [0:46] Second. [0:47] Roll call, please. [0:50] Yes, of course. Dr. Miller? [0:52] Yes. [0:52] Dr. Wantz? [0:53] Yes. [0:54] Dr. Ward? [0:55] Yes. [0:55] Dr. Meyer? [0:56] Yes. [0:57] Director Postgate? [0:58] Yes. [0:58] And Chairperson Webb? [0:59] Yes. [1:00] Motion passes. [1:01] Excellent. Do we have any public comment? [1:04] We do not have any public comment this evening, Chair. [1:06] Thank you very much. And has everybody had a chance to look through the minutes? [1:10] Yes. Yep. Very extensive. [1:12] And motion to approve if appropriate? [1:14] So moved. [1:15] Second. We have a motion by Director Ward, second by Director Meyer. [1:20] Call, please. [1:22] Yes, of course. You guys go so fast. Director Postgate? [1:25] Director Meyer? Director Meyer? [1:30] Aye. [1:30] Director Ward? [1:30] I wake up. Aye. [1:32] Director Wantz? [1:32] Aye. [1:33] Director Miller? [1:34] Aye. [1:34] Chairperson Webb? [1:35] Aye. [1:35] Motion passes. [1:37] All right. Let's move on to reports and updates. It looks like we have Mr. [1:40] Baum with us prepared to give us an update on the Quinta Street Hotel. [1:45] I want to. [1:50] It's summer. We moved up north. [1:52] The sun is out. Sun's out. I was so delighted by the 73 degrees when I got here [1:57] today. It was really fun. [2:01] I'm happy to be here and presenting with you. [2:03] As always, I want to open with gratitude to, FIBA and the city staff who've been [2:09] stalwart advocates for this project. [2:13] Where we are right now, [2:16] we are working through the internal construction. [2:19] You folks came from the board last month to tour. [2:23] Really appreciated having the visitors come through and get to take a look. [2:27] Things have continued to advance through that. [2:30] The event you came to was what's called the topping out ceremony, which in [2:34] wood-frame construction isn't quite as notable as it is in steel construction, but [2:38] it's really where we note that the structure itself is complete, and we are moving [2:43] through envelope and finishes, which is where we're continuing now. [2:50] So again, 86-room hotel. The fourth floor is framed and sheetrocked. [2:56] The subflooring is in, which is the sound barrier between it and the floor below. [3:01] They [3:03] finished painting on the fourth floor. [3:05] They're painting the third floor, starting, I believe, on Monday. [3:09] The envelope itself is complete. If you were to drive by today, you'd see that [3:13] they've got most of the exterior paint coming in. [3:17] We also recently found, and created some savings in the construction budget to [3:23] perform a mural. So there will be some public art that will be engaged there, which [3:28] was requested by Land Use in our first exchange, I don't know, three years ago or [3:34] so. But we just need to create savings for that. [3:37] We also had to find savings for a porte cochere type entry. [3:43] It's not really a true porte cochere. [3:44] It doesn't extend over the driveway, but we do have a much larger welcoming zone to [3:49] help with those Oregon winters. [3:52] So those are some of the value adds. [3:54] We've also, I think I showed this to you last month, [3:57] contracted to bring in a fire pit to the south patio. [4:03] So we want to continue to invite folks to use that as a community space and [4:09] for it to be a little gathering for the folks who come through to use the foreign [4:12] event center or get to come here. So in the future, we may be looking to partner [4:16] with local artists to provide music or other types of expression that just welcome [4:22] folks to the hotel. [4:24] Yeah, that'd be cool. [4:25] We also, in the last week and a half, began a reach out to local artists to figure [4:31] out how we can strike a balance between the overall construction budget, and the [4:36] needs for some art in the rooms. It's not very ornate, but it's something that's [4:40] pretty simple. 86 pieces. There's a corporate mass-produced art that is a part of [4:46] the brand style. We'd like to use something that's a bit more local and a [4:49] reflection of what Florence is. So we'll be working on that over the next few [4:55] weeks to get that out and begin those selections. [4:58] As far as what the critical next dates are, [5:04] we will be wrapping up substantial completion in mid-December. [5:09] Substantial completion marks the contract completion date for [5:15] open permit items. So it means that from the AHJ, the [5:20] Authority Having Jurisdiction's perspective, it's ready for occupancy. [5:25] Then we'll be taking a couple of weeks off for the holidays, and then early [5:29] January, we'll start getting earnest on what we call FF&E, which is fixtures, [5:33] furnitures, and equipment. So that's the panels that go inside the rooms, the beds, [5:37] the TVs, the internet service, the furniture, and some of [5:44] what you consider typically non-attached finishes that go into the building that [5:47] aren't a part of the permit structure. [5:51] Then in the late mid-January, I believe our date right now is January 18th, [5:58] we will complete final completion of all those components. [6:03] In late winter, sorry, late 2026, so probably December, maybe as early as [6:09] November, we'll be bringing on a general manager, and begin hiring our staff. [6:16] One of the things I shared with Siusa News when they toured is the employment [6:22] numbers. We're looking at about 10 to 12 FTEs, full-time equivalents, for the [6:27] project or, I'm sorry, for operating the hotel. [6:30] But in real numbers, that comes out to 22 to 24 people. [6:35] Of course, it's highly seasonal. [6:37] The people we bring to Florence are the people we keep employed. [6:41] One of the ongoing concerns that we have as business operators in these rural [6:46] communities, particularly destination-oriented communities like Florence, is [6:52] housing costs and affordable housing. [6:55] So one of the reasons I'm excited to see on your agenda right now are your efforts [7:00] towards expanding housing in this environment. [7:03] We want to have livable communities that we serve, and we want the folks that work [7:09] with us in housekeeping and in management to also have a high standard of [7:15] living that's sustainable. So that's something that we're pretty interested in, and [7:19] we're trying to make sure our business model, of course, reflects that. [7:23] We're not interested in being a food stamp company. [7:26] Beyond that, we will be working on site work coming up. [7:32] We've already got our landscaper engaged, a local landscaper named Nick Williams [7:36] with Cutting Edge. He works out of Florence and Eugene. [7:40] He did a design build application. [7:42] He's already begun roughing in some of his stuff. [7:44] Earthwork will be continuing with the last pieces of making berms and digging out [7:49] some of the storm treatment facilities. [7:53] Concrete starts next week, the site concrete, that is. [7:56] So we'll start seeing curbs put out there, and we'll start putting in sidewalks and [8:02] the pieces that make the edge work and boundaries of what site work looks like. [8:10] Other than that, I think we're rapidly approaching [8:14] the beginnings of what it looks like the end of the project for construction. [8:21] We're on budget. We still maintain a great relationship with the contractor, with [8:26] the design team, with the city. We always have bumps to [8:32] pick and little nitpicking at this, that, and the other, but we have been working [8:35] through it. We're projecting some savings back to the project, which is great for [8:38] the investors. We've been blessed with a great year as far as weather's concerned, [8:43] so a lot of the things we would've set aside for weather damages, we're beginning [8:49] to realize those savings, which is why we're able to pour some of those savings [8:54] back into these value adds that I mentioned earlier. [8:59] Other than that, [9:02] the economy is a little bit bumpy. We're still hoping that drive-through [9:05] destination [9:08] Places like [9:10] Phoenix continue to be a high attraction. [9:13] But folks are feeling optimistic that this is going to be a great project, and [9:17] we're excited to be here. Appreciate, again, the continued support of the city. [9:21] And if you have any questions, I'm happy to answer those. [9:24] Just for the record, let it be known that Director Bradley is here. [9:29] Any questions for Matt? [9:31] Matt, did you say that you were putting out a call for art, or how are you handling [9:37] the- [9:37] We'll do an RFP, a request for proposals. It'll be kind of a two-part. [9:43] There will be a pricing and selection. [9:48] And so we are price sensitive, because it's called the micro-tel. [9:52] We did something that's a very efficient, small footprint, type of construction. [9:58] So we are sensitive to pricing. It's a really important part of the business model [10:02] to be efficient. [10:04] So that'll be one point, but we also want tasteful art that reflects the community. [10:09] We're looking for something that is modern, but also reflective of [10:14] the community and where we're serving. So we want to be relevant and affordable. [10:19] So that process will be, we'll put an advertisement into Siuslaw News where we'll [10:23] write about what it is that we're looking for. [10:26] We'll nominate what our budget is, and then we'll invite folks to submit. [10:30] I know there are co-ops and communities here. [10:32] There's a whole bunch of people who are interested, so as we've begun those [10:35] conversations and asking questions, [10:38] we've kind of begun to formulate what that plan might look like. [10:42] We want it to be fair, but we also want to balance those principles [10:48] that we're looking for. [10:49] Okay. [10:49] So. [10:50] Thank you. I would love to be in touch with you about that. [10:53] Yeah, you bet. [10:55] I'm the president of the board for the Nonprofit Arts Alliance. [10:58] Wonderful. Well then- [10:59] So [11:00] ... will you please send me an email? [11:01] Because that would definitely be a group we'd want to advertise through. [11:04] Yeah. [11:05] And then, so we'll probably be looking to make selections in the next 45 [11:11] days, 60 days, so that we can make those final art selections and start the [11:15] printing, and it would be part of the move-in process that happens after the new [11:20] year. [11:21] Sure. [11:21] Mm-hmm. [11:22] Okay. [11:22] Yep. [11:25] Anything else? [11:27] Is the mural going to be an outside, outdoor mural? [11:30] Yeah, so we've contracted with a gentleman named Dan Cohen- [11:34] Okay [11:34] ... out of Portland. He's a very well-known muralist here in the Pacific Northwest. [11:40] He lives in North Portland. He's done quite a bit of work. [11:43] I welcome you to look him up. It's C-O-H-E-N. [11:47] He's already done the preliminary research on permitting requirements and the [11:52] public code requirements here in Florence. We've established our budget. [11:56] We went through, we want this to be more of a discovery type of art instead of this [12:01] bold statement kind of art. And if you see his stuff, you'll see a lot of bold [12:04] statement. But he's a talented guy, talented artist. [12:08] So- [12:09] Okay [12:09] ... we did the initial findings this last spring, just to see how feasible we [12:14] thought it might be. And then as we were able to create project savings, we've [12:18] begun to fund that. So it'll probably be installed next March, [12:24] because he doesn't feel like he can get through the art, the selection, and the [12:28] paintings after... He's busy. He's a very busy guy. He's in demand. [12:34] So probably looking at February, March to have that complete. [12:40] Okay. [12:40] And then we've got full buy-in from the financial side, too. [12:43] That was a big deal, working through how to use- [12:48] Okay [12:48] ... project funds for art. Yeah. [12:51] Any Purple Deer or anything like that? [12:53] I will not speak to Purple Deer or not. [12:55] I love Purple Deer, so but don't tell Dan that. [12:59] We'll just let him come up with his own ideas. [13:01] Just a mural boy. [13:02] Yeah, relative to that, I guess this is a really good question for city manager. [13:08] Will that art piece come through the Public Arts Committee, or does it go through [13:14] planning and... What's the process for either approving or [13:20] not approving or whether it even requires approval? [13:24] So as Matt was speaking to their consultant or his professionals are following the [13:29] city processes, and our city processes are through city code and through [13:35] the planning department, and it will actually go through city council. [13:42] Well, for the final approval, it come through the council? [13:45] Mural goes through city council. [13:48] Good. [13:48] Director Boski. [13:52] You said that on the south side, you guys were doing a fire pit and community [13:57] space, and you had mentioned bringing in bands and stuff. [14:00] Who would be in charge of that? Is the hotel going to be running that community [14:04] space as well? [14:05] Yeah. Thank you for bringing that up. I want to be clear with the language. [14:09] When I say community space, what I mean is a gathering space for people who... [14:14] It's not a bar. It's a place where people can buy food and [14:18] listen to music and have drinks on the hotel property. [14:22] So it's not truly a nonprofit community space like you might have here. [14:27] It's really an idea of saying there's nothing else within a quarter mile or eight [14:31] blocks of that place where people can relax and have a nightcap before they go to [14:36] bed. We are really oriented towards the Florence Event Center as one of our [14:42] primary partners, and so we want to have a place that reflects people coming in for [14:48] business, people coming in for other things, too, and we'd like to keep them safe [14:52] and around the area, and we want to provide a environment or location where that [14:58] can be done. So when I use the word community, I mean a gathering space, not [15:01] necessarily a nonprofit, "Hey, give us RFPs. [15:05] We'd love to host the Boy Scouts." [15:08] Not the Boy Scouts. I'm a Boy Scout myself. [15:10] It is a business proposition, but it's one we want to be welcoming to folks to come [15:15] in. We'd love to have [15:17] local food cart. We'd love to have local musicians- [15:20] We do [15:20] ... to come in and do those things. This is a community that really celebrates art. [15:26] Anything else? [15:27] No sir. Sounds great. [15:28] Thank you very much for the update. Thanks, folks. [15:30] Thank you. [15:33] Now we're moving on to a presentation from Homes for Good. [15:36] I assume- [15:38] Yes, we do [15:38] ... [15:39] Have [15:42] Marissa here, and I'm already forgetting your name. I promise, Justin, thank you. [15:48] Well... [15:52] They get set up, as Matt was just explaining. [15:56] Thank you very much for our viewing audience. [15:59] We also have some members listening online. [16:01] The hotel across the street from the Florence Event Center is on Quint Street. [16:06] The hotel is on the east side of Quint Street, directly across the street from the [16:11] Florence Event Center. And the property that Homes for Good is going to be speaking [16:16] about is directly south of the Florence Event Center on the west side of Quint [16:21] Street. Just for some orientation of those who might not be as familiar with [16:26] Florence and what we're talking about tonight. [16:29] While this property is not owned by the Florence Urban Renewal Agency, has never [16:33] been owned by the Florence Urban Renewal Agency, it is within our district [16:37] boundaries, and it is seen as very important catalytic piece of property [16:43] within the agency. And housing has been an important aspect of the city [16:49] council for a goal for our city, and it's important to have these [16:55] updates. So thank you for being here tonight. [16:58] Good evening. Thanks for having us. My name is Marissa Johnson. [17:02] I'm a project developer with Homes for Good Housing Agency, and this is my [17:05] supervisor, Justin Ross. He is the project development manager. [17:09] As spoken, I will be presenting The Field on Quint, an affordable housing community [17:15] on Quint Street. [17:17] Throughout, I will cover who we are, what we're proposing, what it could offer to [17:21] Florence, and where we're at in this application at this time. [17:27] So first, a little about Homes for Good. We are a housing agency for Lane County. [17:34] Our primary work is helping low-income residents navigate [17:39] logistics of affordable housing. [17:42] We think of ourselves as neighbors to those in our community, and want to help [17:48] ensure that they get the housing and assistance that they need. [17:53] With that philosophy [17:57] guides our project, and especially this one here in Florence. [18:04] So as I said, we are Homes for Good. We are the housing agency here in Lane County. [18:08] We have been operating since 1949. [18:11] We were previously known as the Housing and Community Services of Lane County, also [18:16] known as HACSLC. A little bit of an easier name change now with Homes for Good [18:22] In doing so, we were hoping to share with the community an idea of what [18:28] we're out to do. Today, we are serving a little over 5,000 [18:34] families in our community. We have an annual budget of about $60 million, and at [18:39] this time we have approximately 130 full-time employees on our staff. [18:43] Wow. [18:46] Our work includes rental assistance, public and assisted housing, energy efficiency [18:51] services, family self-sufficiency services, resident services, and the development [18:57] of new affordable housing. [19:01] So we are also not new to the Florence area. [19:04] This map shows the other locations that we have in the neighborhood. [19:10] So we would be building on existing relationships. [19:14] This would not be a new [19:17] property for us in this area. [19:20] So we would look forward to continuing our work in Florence. [19:24] Okay. [19:28] Great. [19:29] So our proposed site is highlighted here in red, 505 Point Street. [19:34] There's approximately 6.88 acres, which is located in the strategic growth area. [19:41] The [19:47] property is currently vacant, and we are looking to improve that, make sure it has [19:51] a use within the area. We want to improve [19:57] neighborhood connectivity and contribute to the ongoing revitalization of Florence. [20:05] All right. Our vision is to create a welcoming, flexible space for residents and [20:10] visitors alike. We want to strengthen the community identity, support long-term [20:15] economic vitality, and design for adaptability for future growth in Florence. [20:22] There is a photo here. This is a current concept of what we are looking at. [20:26] We are looking for a development with three residential buildings, for a total [20:32] of 88 units. There would be a mix of one and two bedroom units within that. [20:37] So it would be a total of 132 affordable bedrooms. [20:42] Right now, currently, we are looking about 70, 73 affordable units at [20:48] 50% AMI. And then the additional 15 to 18 would be [20:54] for workforce housing in the area. [20:59] Total space would be a little over 85,000 square feet [21:04] all up. [21:08] Okay. This is a map of our site plan. [21:12] We are really hoping to make sure that this is community focused. [21:15] We want it to be comfortable and safe for the people that are living there and for [21:20] the people in the community. So we are hoping for a walkable, comfortable [21:26] site. The site would include community spaces, garden and play areas, fenced dog [21:32] runs, bicycle storage, parking spaces, and a connection to the Estuary Trail. [21:38] So that we're looking forward to that as well. [21:42] Thank you. [21:42] Oh, you didn't want to- [21:43] It's okay. [21:44] Thank you. [21:48] The site is intended to... Oh, excuse me. Sorry. Potential impacts. [21:56] So not only would this be bringing housing to the area, we would also have [22:00] construction jobs in the near term, and long-term employment opportunities to run [22:05] the site once it's up and running. In this work, it would also increase property [22:10] values in the area by not having vacant land just sitting there not being in use. [22:15] It could also expand the local tax base and increase activity for businesses [22:20] nearby. [22:27] Thank you. The project also aligns closely with FURA's broader objectives. [22:33] We would support urban renewal and revitalization efforts, encourage efficient use [22:38] of underused land, reinforce Florence's long-term development vision, and promote [22:43] economic vitality, and would also contribute to the vibrant, walkable environment [22:48] that is important to Florence. [22:53] Okay, I'm going to be moving on to funding. [22:56] Right here is a slide that gives you the typical process from project concept to [23:01] operations. Begins with project concept, followed by prequalification, intake, [23:07] impact assessment, financial eligibility, commitment, financial closing, [23:12] construction, and operations. Each phase has its own requirements and checkpoints [23:17] throughout. This is generally the steps throughout. [23:24] Right here, I've zoomed in on the Oregon Centralized Application, or ORA, process. [23:30] This is really where we're focusing on funding. [23:34] We have already completed the intake step. [23:38] We are working on our application to submit for the impact assessment, and this is [23:43] a really important part for us. This is getting our project in front of the Oregon [23:49] Housing Community Services, letting them know what we're looking at, what we're [23:53] wanting to do, and an idea of what our budget is looking like. [23:57] They take that, they assess, and then we would move forward to financial [24:00] eligibility. So this is a really important part and time to get us into that [24:05] funding aspect of the project. [24:10] Thank you. And this is a predicted timeline to financial closing. [24:16] So a typical timeline from impact assessment to financial closing is usually about [24:20] one to two years. Financial eligibility to financial closing is usually about a [24:25] year, and commitment to financial closing is approximately six to nine months. [24:29] I say typical because the ORA application does not have a [24:35] prescribed timeline for the wait list. [24:38] Our wait list is first come, first served, and when funding is available, that's [24:41] when we start to move up on the wait list. [24:44] In current climate, if no additional funding is added, we are realistically looking [24:49] about four years out, but we're hopeful that more funding would be coming through, [24:54] and we could potentially push that up a little bit sooner. [25:02] So our next steps, we are here presenting. [25:05] We're wanting to gather feedback from you all. [25:08] We would take that feedback to refine our project, take that back to our [25:12] architecture firm, and really work through to see what we can do to ensure that [25:17] this property would be a good fit for the community. [25:22] And we continue to work on partnerships within the community and other funding [25:26] opportunities that we have, [25:28] or that could be available. [25:30] Wow. [25:33] Perfect. That was quick. But thank you for having us and letting me present today. [25:37] I appreciate it. We're really excited to be here, and I'm open for any questions [25:42] that you may have. [25:44] Any questions? [25:46] Director Briley. [25:48] So this would be affordable housing, and if I understood you right, [25:54] most of it would be at the 50% of the county average income level, people [26:00] who are at that level or below. Is that right? [26:05] Yeah. So we were, right now, with current concept, the three buildings, two would [26:11] be for the affordable housing of the 50% AMI or below, and one of the buildings [26:16] would be workforce, which is between 80 and 120% AMI. [26:20] We're still working on those final numbers. [26:22] And that refers to the cost per month for the renter. [26:28] And so the property itself would continue to be owned [26:33] by Homes for Good? [26:35] Yes, it would. [26:36] And is that [26:40] then taxable land, or? [26:44] No, not as a nonprofit. [26:46] Okay. [26:48] Hmm. [26:49] I need some clarification on that answer. [26:52] So the property would be property tax exempt? [26:56] That's correct. [26:58] And the reason for that is because it's a nonprofit that owns it, or are there [27:03] special state rules that allow that exemption? [27:07] No, it's owned by a nonprofit, so that creates its tax-exempt status. [27:12] Okay, I still didn't hear that. [27:14] It is a quasi-governmental agency. [27:16] It's Lane County's Housing Authority, so it is not taxed land. [27:21] Okay. [27:21] It is owned by a not taxed entity. [27:24] Okay. [27:26] It is off the tax rolls. [27:27] Okay. [27:29] There's a variety of ways to say it [27:31] So I'm big into childcare. We're going to be groundbreaking and ribbon cutting [27:36] tomorrow for our Elm Park Early Learning Center, which is going to have a lot of [27:40] kids in there. Did you give any thought to, or is there any possibility for [27:43] providing childcare facility in this project? [27:47] Yes, we have thought about it. There is discussion. [27:50] We are working with our architects and looking at our funding sources to see what [27:55] options are available. [27:56] Okay. [27:56] We are looking at different locations on our property, potentially different [28:00] phases- [28:01] Okay [28:01] ... but it is something that is on the top of our list of potentially adding now or [28:06] in the future. [28:07] Yes. Thank you. [28:10] Just curious, you said you're probably about four years out, potentially about four [28:15] years out before you break ground or have the project completed? [28:21] Before breaking ground. [28:23] Okay. [28:23] So right now we're looking to get on the wait list for funding. [28:29] Last I heard, there is an ask for about $1.6 billion, which definitely goes [28:34] over what is currently allocated for this biennium. [28:38] If the same amount is allocated to the next biennium as the previous, we would [28:41] still be running a little bit short. [28:44] So there's a little bit of uncertainty on what the timeline is actually looking [28:48] like. But potentially about four years if no additional funding is added. [28:53] And I'm pleased to hear that you're thinking about childcare- [28:56] Yeah [28:56] ... because I don't know how you talk about workforce housing without including [29:00] childcare as a component. And, [29:04] I think the success of that is going to be demonstrated by the Elm Street [29:07] apartments and how much more of a need there is for that in the area. [29:12] May I ask a question? [29:13] Yeah. [29:14] Do you have current data on the need for housing, like an [29:19] economic report for housing in Florence? [29:23] Is that a part of the package that you put forth at the state level, like demand or [29:29] need, rental data? [29:34] It is not something that we need to submit with our application, but we did run, [29:39] through Novogradac, a housing report. [29:42] What's needed, what's here, what's it looking like, and suggestions of bedroom [29:48] sizes, unit sizes- [29:49] Mm-hmm [29:50] ... and things like that. So we have reached out, and we do have that sort of [29:53] thing. [29:53] Is there anything that you can do to do like [29:58] a dated enhanced forecasting, knowing that there is a new hotel going in and some [30:04] economic needs, or especially if you have to resubmit for the next biennium with a [30:09] change in need? I just didn't know how that all impacts things. [30:15] Yeah. So once we're on the wait list, we definitely have an opportunity to go back [30:19] through and update. [30:20] Okay. [30:20] So we can go back and get more updated information if we're on the wait list for a [30:25] really long time or a significant amount of time. [30:27] We can definitely go back and get updated current numbers. [30:32] Okay. [30:32] And we can change those applications. [30:35] And then selfishly, is that data you can share, that rental data income? [30:41] That's just helpful for us in our talking points as we share economic data for the [30:46] city and as we work on our housing goals. [30:48] Absolutely. I can email it over. [30:50] That would be wonderful. [30:51] Yeah. [30:51] Thank you. [30:52] Yeah, thank you. [30:53] Director Ward has another question. [30:54] Yeah. I'm going to put my mayor hat on for a second and just say anything we can do [30:59] as a city to support your project, be sure to let us know. Letters of support or... [31:05] Because we've been [31:08] excited about this opportunity ever since we heard that Homes for Good had the [31:13] property and that it was going to be moving forward, and the idea of having [31:17] workforce housing that is within walking distance of the work [31:24] is a good thing for our community. [31:27] Absolutely. [31:27] Yeah. [31:27] Director Berry. [31:30] It sounds like [31:32] that as long as Homes for Good presents a project [31:38] that checks all the boxes and presents it to the state, that you automatically [31:44] get added on to the state list, and just at the bottom and you have to work your [31:49] way up. I guess a couple questions. [31:53] One, [31:55] are there priorities? Where's priority is this in Lane County? [32:01] Is this your top priority, or are we like the third one down in line, or? [32:07] For Homes for Good. [32:08] Yes. [32:10] Cool. [32:11] I'd be happy to speak to that. I think this has been a big priority for Homes for [32:15] Good for a long time. We have several projects in the works. [32:20] One of the biggest ones we're wrapping up right now is Ollie Court. [32:23] That has a childcare component that you mentioned. [32:26] Okay. Where's that? [32:27] That's in Eugene. It's on 13th and Chambers. It's 88 bedrooms. [32:32] It's kind of a commensurate size to the field on Quince. [32:36] And that one was built with three childcare entities wrapped up into one [32:42] of the ground floors, and so that's been a great success. [32:44] Excellent. [32:45] It was a really hard endeavor, and it took individual champions outside of Homes [32:50] for Good to bring a lot of the funds that made that happen. [32:57] This is the biggest project that Homes for Good has on its radar right now. [33:01] So- [33:02] So you have some that you're [33:05] either have done or are in the process of completing, and now this is the top [33:11] one that you have planned to go next? [33:14] Yeah. We have some downtown projects in Eugene that are small, but everything right [33:20] now is dependent on the ORCA process, which is how we receive our funding from the [33:25] state, OHCS. [33:28] And that process used to be a competitive process, and it was referred to as a [33:31] NOFA. [33:33] And when it was a competitive process, Homes for Good always did very well, scored [33:38] highly, and received competitive funds much quicker. [33:44] They've removed the competitive component from that and allowed virtually everyone [33:50] at this point to apply for state funds- [33:52] Mm-hmm [33:52] ... even your regular developers. [33:56] And so that hasn't made the process any quicker. [34:02] And so those are the delays that we're navigating now, is there are a lot more [34:06] people that have a lot more access to the same amount of funds in a time that [34:10] everyone needs them a lot more. And so that's part of the driving factor, but why [34:15] this has been an ongoing discussion. [34:19] Add to that, that we are almost always beholden to boldly rates or prevailing wage [34:25] when you have federal dollars on a project, and that creates a time component where [34:29] by the time you get back around to the funding, the price of the project has gone [34:34] up. And so we're really looking for some homeostasis here, where just everything [34:37] sort of levels out and we can be funded and move forward with the project. [34:41] So the state agency, I think you said, is going to be asking legislature for $1.6 [34:46] billion? [34:48] That's the current ask of the projects that are on the wait list as of right now. [34:53] Okay. So that's the four-year, five-year. But how much of that is federal funding? [34:59] Or is that mostly state funding or mostly federal, the pass-through money? [35:05] That's a good question. I would say the vast majority of that is generated from [35:09] in-state, but I'll follow up on that- [35:13] Yeah [35:13] ... and get back to you for an appropriate ratio. [35:16] Okay, great. [35:18] Director Wald. Curious to know, I saw the renderings of the buildings, and they [35:22] look like they're two or three stories high. [35:24] Mm-hmm. [35:24] Do we have elevators? [35:25] Three and four. [35:26] Three and four. Elevators? [35:28] Yes. One of the buildings is elevator served. [35:31] And the others don't? [35:32] Correct. [35:33] Well, that's interesting. Isn't it? [35:37] Yeah. [35:37] Okay. [35:37] Yeah. The larger building is elevator served, and that's one of the buildings that [35:42] would be earmarked for affordable housing. [35:45] Okay. Thank you. [35:46] Mm-hmm. [35:48] What happens when somebody gets a job and they're no longer eligible for subsidized [35:52] housing? What happens to their rent? [35:57] So it would be a voucher. There would be a project-based voucher. [36:00] They pay 30% of their income. Once they hit a maximum number, I believe there's [36:05] about a year that they have to work and have that... [36:12] Excuse me, sorry. They can work with the rent assistance team, and there are [36:18] steps that they can do. I don't know all of the details, but they have about a year [36:21] of steps. And I know that it's based on 30% of their income is what they would be [36:25] paying. [36:26] So do they potentially lose their spot after a year? [36:30] Wouldn't lose their spot. They would just potentially lose a percentage of the [36:34] funding and the assistance that they're getting. [36:36] They would be able to stay in the unit, they just would no longer have the voucher [36:40] attached to it. [36:41] I've always had a challenge with that, with subsidized housing. [36:44] It doesn't seem to incent people getting ahead. [36:48] So they're just losing their subsidy. [36:50] Yeah. [36:51] And they have a job, they're just going to pay more rent. [36:54] Understood. [36:54] Yeah. [36:55] Just to me, it never seems to quite balance out. [36:59] Anyway, I'm glad you're bringing the project to Florence. Any additional questions? [37:04] Thank you very much. [37:05] Thank you for your time. [37:07] We'll see you soon. [37:08] I just had one comment because they mentioned a couple projects that they have. [37:11] If you go to the Homes for Good website, you can see the pictures of the projects [37:15] current and past, so. [37:17] Thank you. [37:18] And while they're both here and Matt is still here, the mayor mentioned providing [37:24] letters of support. I want to say publicly a thank you to both Homes for Good and [37:29] to Bond Development. They provided letters of support to the Florence Urban Renewal [37:35] Agency as we submitted our transportation grant management grant [37:41] application for our Old Town Revitalization Streetscape project application. [37:48] Thank you to Shantel Meyer and Megan Messmer and our team for getting that in last [37:53] week before the deadline, and to our Old Town committee for working on that. [37:59] So we're excited. Thank you for your support and seeing value in the project, and [38:05] we will keep you posted as we think we'll find out results on that grant sometime [38:10] by the end of September, beginning of October. [38:13] Thank you. [38:13] So thank you for your support. [38:15] Yeah. [38:17] As you leave town, don't turn right and go to Eugene. [38:21] Turn left on 126, cross 101, and go down about a mile to the Justice Center, police [38:27] station. Turn right, and you'll see the new Elm Park Apartments and the detached [38:31] Elm Park Early Learning Center. [38:33] We were just there a couple weeks ago. It's beautiful. [38:35] We were? Okay, good. Yeah. [38:38] Absolutely. [38:39] I'm so proud of that. We are very proud. [38:42] We'll still stop by on the way out again today. [38:46] Thank you. [38:46] Thank you very much. [38:47] Thank you. [38:49] City manager report. [38:51] Thank you. I kind of quickly gave part of it just in case they ran out the door [38:56] really quickly, but that was part of my city manager report. [38:59] So thank you for letting me do that prematurely. [39:02] Thank you, Marissa and Justin, for your report. We're always anxious. [39:08] We never have... Patience is, I know, a virtue. [39:11] It's not one of my fruits of the spirit. [39:16] Anyway, I'll work on that. I know we kind of went over this quickly at the [39:22] beginning of the meeting, but Urban Renewal does have a new member. [39:26] Myrna Kleppinger is our new member. [39:29] She did let us know that while she was appointed by Mayor Ward at our last city [39:34] council meeting, that she was going to be unable to attend tonight. [39:39] She may be listening in virtually. [39:40] I didn't recognize any of the names on there, but she was going to be traveling. [39:46] So Myrna will be at the next meeting that we have. [39:51] As I mentioned, we were able to submit last week ahead of the deadline [39:56] for the... We have such a long name for it, so I'm just going to [40:02] read it, [40:04] for the transportation grant management application for our Florence Old Town [40:08] Revitalization and Streetscape project. [40:11] It was a lot of very intentional work put in by Shantel Meyer, who's [40:17] a great writer, with support from Megan and myself and the committee. [40:23] And we had [40:26] one, two, three, four, five, six, seven, [40:29] eight, nine... Did we get any more after that? Nine letters of support. [40:34] Very rich support. And like I said, two of them are here tonight, so even counting [40:39] the city, one from the mayor. [40:42] So- What? Silaram here? Was Rival to get in? [40:48] Sorry. We tried. [40:52] We had great support, amazing, and I think we have a really strong application, so- [40:57] What will that grant get us? [40:58] So this grant would give us around $200,000 with about $22,000 match from Urban [41:04] Renewal Agency to support the Urban Renewal Agency in what we call [41:11] 30% design [41:13] plans and community engagement [41:19] support to help [41:23] design basic engineer plans of what could be possible [41:29] in what will be determined an area. [41:34] But we're going to say we're going to focus on the core area of Old Town, but it's [41:39] going to have some radiating effects because this is a transportation grant, and [41:44] there's no way to say, "Oh, you're only focusing on one area," because it's a [41:47] transportation corridor, and create this refinement plan. [41:52] That's what it's referred to in the transportation system plan, is we need a [41:56] refinement plan for the downtown area. [41:59] We have the fancy words, but really it's how do you create a modern, [42:05] ADA, beautiful space, meets all of the things that [42:11] everybody wants, which is wide sidewalks, great parking, beautiful [42:17] pedestrian amenities that creates that economic vibrancy [42:24] for your community, that also is great for transportation, that [42:29] connects your downtown with all around town, that economic [42:35] corridor. So there's a very focused area that's going to get a lot of [42:40] attention, but it's not in a vacuum. [42:44] It does connect to the other transportation aspects. [42:50] And that's just the best way I can keep saying it. It will radiate out. [42:54] It's not going to be just Bay Street, which is why we did not call it Bay Street. [42:59] It is the Old Town project. It also talks [43:04] about utilities. Transportation funds cannot be used for [43:10] water, wastewater, and stormwater, and electrical utilities, but it can coordinate [43:16] with the utilities, which is an important part of the project. [43:20] So we need to still be planning and coordinating those engineered plans with what [43:26] does the water, wastewater, stormwater, and electrical look like. [43:30] And so we did make sure we talked about the importance of that. [43:34] We also highlighted the importance of how Central Lincoln PUD wants to [43:40] underground their utilities now. [43:43] So this is an important part of why now and why is this important. [43:48] And also the other reason why now and why is this important is because you did your [43:51] five-year strategic plan, and you have about $11.7 million in tax [43:57] increment financing available in about two years from now. [44:02] And you need to know how to prioritize and figure out how you're going to best [44:06] spend those dollars. And that 30% plans are going to help you decide how to [44:12] best invest those dollars in partnership with the city, these partners like the [44:18] Port of South, Central Lincoln PUD, Lane Transit District, and the City [44:24] of Florence, and the utilities. So that's the hope. [44:29] It would be work to come, and we did this before with Revision [44:34] Florence. We had a contract with an engineering firm [44:40] called Murray Smith Associates, and we did this exact same thing with them, and it [44:45] resulted in Revision Florence, and so this is where we're at, at the beginning [44:50] stages of taking a dream to a reality, and it's pretty exciting. [44:55] So hopefully we are successful in this grant, and if not, we'll come back, and [45:00] we'll talk about what other options we have to pay for that project. [45:07] So that's that. [45:11] I also wanted to speak to you about September. [45:18] So the month of September, we are scheduled to- [45:21] September coming up? [45:22] Yeah. There's like- [45:24] Almost felt it. [45:28] September. So the month of September, we don't have any action items on the horizon [45:33] for you, so we're suggesting that maybe the committees schedule and meet. [45:38] I know we have some work to do for this Old Town committee, and we could probably [45:44] reconvene and do a little bit of work on the North Quint Street committee [45:50] and then just come back and meet in October for Urban Renewal. [45:55] So I'll leave that for Chair Webb to think about. [45:59] I don't see any objection to that from the current folks. [46:02] Right. [46:03] So, okay. [46:04] And then look to hear from our committee leads. [46:08] You have Lindsay leading the Quint Street property and [46:13] Shantel leading the Old Town committee property. [46:20] And then I'm going to look at Megan, see if she has any updates for the group. [46:24] Lindsay? Okay. The Public Art committee [46:30] had a great tour on Saturday, and all of our art pieces are in place, and [46:36] we'll have some changes in movement in the future. [46:40] So just stay tuned, follow us on social media for all the updates. [46:44] We have a lot going on in the city, and that's a good way to know what's going on, [46:48] is if you follow us on Facebook or Instagram. And then subscribe to our newsletter. [46:54] The city's going to publish a newsletter next week because it's September already. [46:59] Okay. [47:01] And I think with that, concludes my report, and I'll turn it back over to you, [47:05] Chair, to see if anybody else has anything to say. [47:07] Thank you very much. Any additional questions for Erin? [47:11] Well, I don't have a question for Erin, but I just wanted to encourage everybody to [47:17] swing by the Elm Street Apartments, mainly to see [47:22] the light poles that they have there now with the solar panels on top and [47:28] the little whirly thing that- [47:30] Uh-huh [47:30] ... in the wind and- [47:31] Those are the city's. That's part of our infrastructure project, actually. [47:35] Is that right? [47:35] Yeah, so the streetlights- [47:36] Didn't notice that [47:37] ... those are what we installed. [47:39] Will you let Michael Allen know those are there? [47:41] I'll leave that with Michael. [47:43] Same that we have at Public Works building? [47:45] Similar. [47:45] Similar, yeah. [47:47] Excellent. [47:47] Excellent. [47:49] That was a part of our project. [47:51] Well, thank you. [47:51] Yeah. [47:52] Any comments for the... Go to the order. [47:54] 2:00 tomorrow at the Elm Street? [47:57] What time is the Elm Street opening tomorrow? That is by invitation only. [48:02] Oh. [48:02] But that's okay. But I believe you're correct. [48:05] Okay. We can stand in back, but won't get a seat. [48:08] I don't want a seat. [48:09] No. [48:09] It's by invitation. [48:10] He's got a long list of people. [48:12] If you were invited, you're invited. We just... For the viewing public, right? [48:16] Right. [48:16] I'm just saying. [48:17] Right. Yes. [48:19] Seeing nothing else, do we have a motion to adjourn? [48:22] So moved. [48:23] All right. Meeting adjourned. [48:25] Thank you, everyone. [48:26] All right. Good job. Cheers