1 00:00:35,860 --> 00:00:51,000 Good afternoon, Mr. President. And Vice Chair of the Armed Select Board. And today's date is September 23rd. We're having a meeting, starting at 5.30. And I hope you all joined me for the pledge of allegiance. 2 00:01:11,970 --> 00:01:17,090 As you heard me say before, the fire exits has been dated by Massachusetts. 3 00:01:17,290 --> 00:01:21,570 If you go out this door to my left, take a right, you can hit Prospect Street. 4 00:01:21,770 --> 00:01:26,250 If you go through this door to my right through the door, through the room upstairs, take 5 00:01:26,250 --> 00:01:31,850 left in your own prospect street and I would encourage you not to use the elevator in case 6 00:01:31,850 --> 00:01:32,630 of a fire. 7 00:01:34,730 --> 00:01:47,970 So today's meeting is a public hearing for conversation on 16 to 36 West Main Street. 8 00:01:49,250 --> 00:01:52,610 Well, I'm sorry, West River, West, West River Street. 9 00:01:52,850 --> 00:01:54,450 I knew that, Kara. 10 00:01:57,290 --> 00:02:01,050 Yeah, also known as the brick pile. 11 00:02:01,270 --> 00:02:03,590 Also known as the old serial factory. 12 00:02:08,040 --> 00:02:09,000 There you go. 13 00:02:09,520 --> 00:02:13,840 So it's very historical, so site site, which is now open. 14 00:02:15,000 --> 00:02:16,780 And orange is the owner. 15 00:02:17,680 --> 00:02:21,460 And we're looking at what we want to do 16 00:02:21,460 --> 00:02:26,060 And the town has town citizens and residents have some import. 17 00:02:26,220 --> 00:02:29,500 And that's why you're here to tell us what you think. 18 00:02:30,200 --> 00:02:34,320 So what I'd like to do is we have the engineering forum 19 00:02:34,320 --> 00:02:37,460 firm, plus no-neal, could give us a presentation 20 00:02:37,460 --> 00:02:40,860 as to where you are in this. 21 00:02:42,080 --> 00:02:46,880 And then we have at least a letter from the LLC that owns it 22 00:02:46,880 --> 00:02:53,480 where they are and then we'll open it up to citizen comments and we'll have a time limit 23 00:02:53,480 --> 00:02:59,620 and everybody who wants to talk and talk and we'll see what anybody has to say. 24 00:03:01,260 --> 00:03:04,640 So Chris, Tim, come on down. 25 00:03:09,030 --> 00:03:09,410 Sit here. 26 00:03:10,010 --> 00:03:10,330 Yes sir. 27 00:03:11,270 --> 00:03:11,830 Okay. 28 00:03:11,850 --> 00:03:12,790 Let's see. 29 00:03:13,490 --> 00:03:14,230 Let's see. 30 00:03:14,470 --> 00:03:15,030 Let's see. 31 00:03:26,860 --> 00:03:30,520 We're going to pull up the survey that we completed. 32 00:03:31,420 --> 00:03:37,700 So that folks can see that on the screen and then we have these pictures. 33 00:03:41,200 --> 00:03:41,640 Okay, 34 00:03:47,180 --> 00:03:56,740 so the board's just looking for kind of an overview of what we've done, kind of the sequence of events that have brought us here today is that. 35 00:03:57,640 --> 00:03:59,700 Yeah, so I believe I don't have a formal presentation. 36 00:03:59,700 --> 00:04:06,180 that that's what I believe back in the summer you or your group made a 37 00:04:06,180 --> 00:04:11,960 presentation pretty much saying we're done with what we contracted to do and we 38 00:04:11,960 --> 00:04:17,280 go back and come up with some ideas of what we might do with that lot. 39 00:04:17,880 --> 00:04:26,000 Well yeah so initially the plan was to do a design process for parking 40 00:04:26,000 --> 00:04:32,760 specifically, and so that's what we were initially contracted to do after that meeting in May. 41 00:04:33,900 --> 00:04:41,000 In addition to that, to kind of make some additional progress as it relates to the environmental work, 42 00:04:41,880 --> 00:04:48,760 which is sort of something that needs to be done anyway, but is also informed by the land use, 43 00:04:48,760 --> 00:04:51,080 you know, the ultimate plan for the site. 44 00:04:51,080 --> 00:04:59,740 So in other words, the environmental cleanup and the DEP process would vary depending on whether 45 00:04:59,740 --> 00:05:07,640 we use this as a parking lot or as a park, which is considered a higher risk land use 46 00:05:07,640 --> 00:05:09,500 from an environmental standpoint. 47 00:05:11,760 --> 00:05:15,760 So we've been working on the environmental reports. 48 00:05:15,760 --> 00:05:38,440 We've completed the survey with some contractor of ours prepared that survey and we also did a wetland delineation to inform, at the time, a notice of intent or wetland permitting steps, all with the goal of building a parking lot there. 49 00:05:38,440 --> 00:05:48,720 And then, you know, I heard from Matt that there was some rethinking of the ultimate use objectives for that property. 50 00:05:49,680 --> 00:06:03,940 And so we prepared kind of a scope reallocation, if you will, to move away from the parking concept to more of a public park, kind of municipal use concept. 51 00:06:05,700 --> 00:06:12,160 And so, you know, that's something we share with the town, and now I'm here today to kind 52 00:06:12,160 --> 00:06:17,540 of talk about, okay, is it parking lot or is it park or is it both, and so that's kind 53 00:06:17,540 --> 00:06:18,320 of where we're at? 54 00:06:18,780 --> 00:06:18,800 Yeah. 55 00:06:19,200 --> 00:06:19,520 It's okay. 56 00:06:20,000 --> 00:06:24,560 And we also, we also, I think, as a committee wanted to make sure that we had public input 57 00:06:24,560 --> 00:06:31,840 that at the time that we didn't have, there was ideas, there were more people, 58 00:06:33,920 --> 00:06:33,920 there were 59 00:06:33,920 --> 00:06:38,760 I'm the scene stuff that we didn't chat with that day. 60 00:06:39,020 --> 00:06:40,180 So we wanted to give time for it. 61 00:06:40,200 --> 00:06:43,280 So this meeting is just about this, which is nice. 62 00:06:43,440 --> 00:06:43,780 Understood. 63 00:06:45,000 --> 00:06:47,760 And so, you know, I invited me up to be here to help 64 00:06:47,760 --> 00:06:51,460 however I can and help kind of that dialogue and the public 65 00:06:51,460 --> 00:06:57,580 and the board sort of make a decision and we'll do the best 66 00:06:57,580 --> 00:07:01,700 we can to leave the town with a good work product to kind of build 67 00:07:01,700 --> 00:07:03,200 off of and and move forward. 68 00:07:03,620 --> 00:07:09,880 Did Pusson or Neil come up with any other alternative possibilities that we should be considering? 69 00:07:11,380 --> 00:07:19,360 Um, I guess the only one, I wouldn't say we came up with it, but one thing I had talked with Matt about was the possibility that the town, you know, 70 00:07:20,160 --> 00:07:26,520 if the town were to try and sell the property, you know, what would that look like, how would that fit into possibly? 71 00:07:30,000 --> 00:07:47,700 You know, the cleanup plan, you know, if the town wanted to sell the property on the market to a private developer, you know, how should we handle the environmental piece to best position the property for, you know, resale if that were the decision. 72 00:07:48,420 --> 00:07:59,500 Got it. Got it. Excellent. Okay. The other party that has been involved is the LLC that owns what I know is Carroll supermarket building. 73 00:08:01,760 --> 00:08:08,260 the one on the corner. And we have a letter in my binder. I think we do have a 74 00:08:08,260 --> 00:08:15,180 representative here, 50, 50, 50, a self-mainstream. Lisa Malo is here. 75 00:08:15,320 --> 00:08:23,840 Oh, excellent. Would you come up and grab a chair? You can, you can sit next to 76 00:08:23,840 --> 00:08:26,180 sure you can kick him out whichever you prefer. 77 00:08:26,180 --> 00:08:27,180 You can take one. 78 00:08:27,360 --> 00:08:28,960 You want them to be crisp, but his name is Tim. 79 00:08:29,180 --> 00:08:30,040 Oh, Tim, I'm sorry. 80 00:08:33,460 --> 00:08:33,860 Hi. 81 00:08:34,060 --> 00:08:35,340 I'm Lisa and I'll go with four columns. 82 00:08:36,000 --> 00:08:36,400 No. 83 00:08:36,780 --> 00:08:37,040 Sorry. 84 00:08:37,220 --> 00:08:38,380 I'm representing the sellers. 85 00:08:38,920 --> 00:08:39,540 Excuse me. 86 00:08:39,780 --> 00:08:41,480 The owners of 50, 50, eight. 87 00:08:41,560 --> 00:08:42,300 South Main Street. 88 00:08:44,540 --> 00:08:44,740 Is that? 89 00:08:45,320 --> 00:08:46,140 Yes, South Main Street. 90 00:08:47,320 --> 00:08:51,460 Is that both buildings against the river and the one on the corner? 91 00:08:51,520 --> 00:08:52,180 That is correct. 92 00:08:52,300 --> 00:08:52,560 Great. 93 00:08:53,860 --> 00:08:54,160 Yeah. 94 00:08:54,160 --> 00:08:55,920 We refer to them as 50, 50, 50, eight. 95 00:08:55,920 --> 00:09:03,160 So their intention with those buildings, they are in the process of pulling a permit to do the brick repair that was requested. 96 00:09:04,060 --> 00:09:09,680 The contractors in the process now, I don't know if Jason actually has a copy of the permit, but that is being done. 97 00:09:10,660 --> 00:09:13,920 The next step is they're going to be doing the roof. 98 00:09:14,600 --> 00:09:22,620 And then they are now in process working with an engineer for developing 40 to 45 units inside those buildings for residential living. 99 00:09:22,620 --> 00:09:32,780 So what they would like on this parking on the parking on your drawing that's right in front of David is a portion of the parking lot 100 00:09:32,780 --> 00:09:39,400 So they can develop that parking lot for dedicated parking for the residents that are going to be living inside those buildings. 101 00:09:40,620 --> 00:09:48,420 Okay, they would take on the responsibility of the paving anything that that is needed to go with those buildings. 102 00:09:48,420 --> 00:09:54,920 But they do need that in order for, in order for it to be completed. 103 00:09:57,380 --> 00:10:03,100 I know that it gets into sticky wicket when the town is selling to a one individual. 104 00:10:04,200 --> 00:10:07,900 But that doesn't happen when it's a rental or long-term lease. 105 00:10:08,680 --> 00:10:15,260 Would you be looking at something that we draw a line down the lot and you'd say, I can 106 00:10:15,260 --> 00:10:16,940 develop this under a long-term lease? 107 00:10:16,940 --> 00:10:37,360 We would be open to anything the town suggests, as long as we have parking, she would like to own it, obviously, but if she cannot, I would like to give you, you know, give me some options, so I can, I can go to her, or go to, you know, the LLC that owns this and presents it to him. 108 00:10:37,520 --> 00:10:38,980 You're looking at about 45. 109 00:10:38,980 --> 00:10:44,660 40 to 45 correct? 40 to 45 species. Yes. Okay. 110 00:10:45,080 --> 00:10:47,000 Yeah, we need TA on this. 111 00:10:47,260 --> 00:10:50,620 It's funny because I had this conversation with her today and I said, 112 00:10:51,320 --> 00:10:53,200 they're going to ask me that and you ask me that. 113 00:10:53,720 --> 00:10:58,280 I do not but I can go back at it. She's waiting for the engineer to develop. 114 00:10:58,420 --> 00:11:04,240 Obviously we all know that those buildings have some issues with structural issues 115 00:11:04,240 --> 00:11:10,040 and the whole plan was developed there in process they have it and their engineer has to make 116 00:11:10,040 --> 00:11:14,540 sure that the buildings are safe before they can develop them into units. 117 00:11:15,760 --> 00:11:23,260 So I don't know, but I can go back at her and ask her to estimate when they're going 118 00:11:23,260 --> 00:11:24,060 to be doing that. 119 00:11:24,060 --> 00:11:29,560 I think we would be interested in that also, Mr. Manager, any questions? 120 00:11:31,360 --> 00:11:35,680 Sir, questions, comments, and if you guys have any questions for me, let me know. 121 00:11:36,440 --> 00:11:42,900 A couple of points I'd bring up is that when we have not received building permanent application, 122 00:11:43,220 --> 00:11:49,060 from 50-58, and that of course isn't helpful because we are anticipating it, 123 00:11:49,580 --> 00:11:55,600 And it's being, it's part of the narrative, and yet we don't have that application. 124 00:11:56,100 --> 00:12:01,580 I did speak to her today, she said her contract, she's allegedly been working on it since Monday. 125 00:12:02,140 --> 00:12:04,640 So I can give her a call again either tonight or tomorrow. 126 00:12:05,080 --> 00:12:08,500 Find out the status on where that is. 127 00:12:08,520 --> 00:12:11,680 I think it would be helpful too for the town if we knew who they were. 128 00:12:13,120 --> 00:12:23,480 I Jason knows who they are because obviously he's involved. They are just not ready to come and speak because they don't want to be bombarded with 129 00:12:24,440 --> 00:12:30,840 Everybody's ideas. They have their own ideas for the buildings and they want to be able to bring that to fruition 130 00:12:45,080 --> 00:12:53,700 Additionally, the building department is requiring a large amount of engineering because of the building being in the shape that it is in now. 131 00:12:54,420 --> 00:12:59,120 We want to see it safe, made safe, and then we can continue to move forward. 132 00:13:00,800 --> 00:13:03,260 So my, I don't know why I say it right. 133 00:13:03,520 --> 00:13:13,340 My squeeze is public safety first with the building, so we've been back and forth. 134 00:13:13,340 --> 00:13:21,000 with that group to make it safe so they can commit to additional investment within that area. 135 00:13:22,140 --> 00:13:28,300 So some of them might be my fault because I want more and I want to see good engineering 136 00:13:28,300 --> 00:13:36,000 quality engineering again to keep that area in that well-traveled area safe for people around there. 137 00:13:36,380 --> 00:13:39,240 Right, that is the first thing people see when they come into orange. 138 00:13:40,060 --> 00:13:41,600 We want to make sure it's done properly. 139 00:13:42,880 --> 00:13:46,320 I have a letter from you when we're dying. 140 00:13:46,620 --> 00:13:53,620 I'm wondering if we should read that on the record so that's in there. 141 00:13:54,240 --> 00:13:56,460 And Julie, would you use the clerk? 142 00:13:56,680 --> 00:13:58,000 I'm Kelly, but. 143 00:13:59,540 --> 00:14:02,840 Or maybe I'm Tim, or Chris. 144 00:14:04,800 --> 00:14:05,260 Are you sure? 145 00:14:06,060 --> 00:14:07,140 I don't know. 146 00:14:07,940 --> 00:14:09,340 Which one are we? 147 00:14:09,340 --> 00:14:12,120 I'm going to read you one. 148 00:14:12,600 --> 00:14:13,580 You know, it must be in here. 149 00:14:13,920 --> 00:14:16,400 It's just, oh, got it. 150 00:14:16,680 --> 00:14:17,220 Oh, wait. 151 00:14:17,220 --> 00:14:20,780 It looks like this. 152 00:14:20,960 --> 00:14:22,260 Oh, okay, I'll just read that. 153 00:14:22,500 --> 00:14:23,000 All righty. 154 00:14:23,900 --> 00:14:26,740 So September 9, 2000, 155 00:14:28,340 --> 00:14:30,760 1226, town of Orange, Board of Selectman, 156 00:14:31,640 --> 00:14:33,620 regarding the proposed parking arrangement 157 00:14:33,620 --> 00:14:35,960 for the 50, 50, it's South Main Street, 158 00:14:36,100 --> 00:14:38,540 workforce housing redevelopment project. 159 00:14:38,540 --> 00:14:44,120 Dear members of the Board of Selectman, on behalf of the owners of 50 South Main Street, 160 00:14:44,460 --> 00:14:48,580 identified as parcels 228 and 58 South Main Street, 161 00:14:48,920 --> 00:14:50,740 identified as parcels 229. 162 00:14:51,680 --> 00:14:58,000 I respectfully submit this proposal concerning parking for the planning workforce housing redevelopment 163 00:14:58,000 --> 00:14:58,820 of these properties. 164 00:14:59,560 --> 00:14:59,960 The owner. 165 00:15:00,000 --> 00:15:08,020 Acquired both properties in July, 2025, with the intention of developing workforce housing in downtown Orange. 166 00:15:08,300 --> 00:15:26,280 During the acquisition process, the Board of Selectman provided the owners with a letter expressing the towns willingness to explore the feasibility of reserving up to 48 parking spaces for the exclusive use of residents of the proposed 50 to 58 South Main Street redevelopment project. 167 00:15:26,280 --> 00:15:41,160 The town's letter also confirmed that the town retains full discretion over the future use and development of the municipal property located at 16-36 West River Street identified as parcel to 27. 168 00:15:41,980 --> 00:15:52,260 The purpose of this letter is to present a possible method for creating the proposed residential parking spaces, while also preserving a substantial portion of parcel to 27 for public parking. 169 00:15:52,260 --> 00:16:04,900 According to the conceptual parking lot design, included in appendix e-parcel 227 could potentially accommodate approximately 156 parking spaces allocated as follows. 170 00:16:05,820 --> 00:16:14,040 Ro A, 44 spaces, ro B, 38 spaces, row C, 38 spaces, row D, 36 spaces. 171 00:16:14,920 --> 00:16:20,600 To implement the proposed residential parking arrangement, the owner respectfully request that the town consider the following. 172 00:16:20,600 --> 00:16:34,300 Number one, the town would divide parcel 227 into two parcels referred to in this proposal as partial 227-1 and parcel 227-2. 173 00:16:34,840 --> 00:16:42,700 The proposed division line would be located approximately 141 feet from the right side property line. 174 00:16:42,700 --> 00:16:49,240 subject to a final survey, engineering review, permitting, and all required governmental approvals. 175 00:16:50,400 --> 00:16:58,520 Number two, the town would convey deed, lease, and other assigned parcel to 27-2 to the owner, 176 00:16:59,000 --> 00:17:04,900 under terms mutually acceptable to both parties and subject to all applicable legal requirements and approvals. 177 00:17:04,900 --> 00:17:12,620 At the owner's sole expense, the owner would construct approximately 48 parking spaces in parcel 178 00:17:12,620 --> 00:17:21,680 227-2 for the exclusive use of residents of the 50-58 South Main Street redevelopment project. 179 00:17:22,200 --> 00:17:29,120 Number four, the preliminary design currently identifies 15 spaces in row A, 11 spaces in 180 00:17:29,120 --> 00:17:36,240 be 11 spaces in row C and 10 spaces in row D for a total of 47 spaces. The final design 181 00:17:36,240 --> 00:17:41,820 would be adjusted if feasible and approved to provide the requested total of 48 spaces. 182 00:17:42,820 --> 00:17:47,080 Number five, the town could develop the remaining portion of the property parcels 183 00:17:47,080 --> 00:17:55,120 227-1 with approximately a 108 parking public parking spaces at the town's expense in according 184 00:17:55,120 --> 00:17:58,800 to the town's preferred schedule, funding and development plan. 185 00:17:59,680 --> 00:18:06,660 If the town ultimately intends to develop parcel to 27, as a 156 space public parking facility, 186 00:18:07,180 --> 00:18:11,140 this arrangement could reduce the town's construction responsibility and related expensive. 187 00:18:11,960 --> 00:18:16,800 The owner would fund and construct the portion serving the workforce housing project, while 188 00:18:16,800 --> 00:18:22,060 the town would remain responsible for developing approximately a 108 public parking spaces. 189 00:18:22,060 --> 00:18:27,820 The owner respectfully request that the board review this proposal and authorize the appropriate 190 00:18:27,820 --> 00:18:34,780 town officials to begin discussions regarding the proposed division and disposition, or 191 00:18:34,780 --> 00:18:38,180 long-term lease of a portion of parcel to 27. 192 00:18:38,940 --> 00:18:42,480 Timely consideration of this matter is important so that the owner may determine whether 193 00:18:42,480 --> 00:18:46,020 the workforce housing development can move forward. 194 00:18:46,020 --> 00:18:52,220 This proposal is intended as a framework for discussion and does not create a binding obligation 195 00:18:52,220 --> 00:18:53,540 on either party. 196 00:18:54,380 --> 00:19:00,820 Any subdivision, conveyance, lease, parking allocation, construction obligation or other 197 00:19:00,820 --> 00:19:06,960 commitment would be subject to final plans, applicable, municipal and state requirements, necessary 198 00:19:06,960 --> 00:19:12,880 governmental approval, and the execution of mutual acceptable written agreements. 199 00:19:12,880 --> 00:19:18,340 Thank you for your consideration in this proposal and for the town's willingness to explore parking 200 00:19:18,340 --> 00:19:23,540 solutions that could support workforce housing and continue downtown development in orange. 201 00:19:24,060 --> 00:19:29,180 We welcome the opportunity to meet with a board and appropriate town officials to discuss 202 00:19:29,180 --> 00:19:30,840 the proposal and greater detail. 203 00:19:31,240 --> 00:19:33,000 Respectfully submitted, we submit. 204 00:19:34,020 --> 00:19:34,680 Representative. 205 00:19:37,190 --> 00:19:37,490 Thank you. 206 00:19:37,490 --> 00:19:37,850 Thank you. 207 00:19:38,270 --> 00:19:39,710 Thank you. 208 00:19:41,490 --> 00:19:45,790 Has everybody seen the drawings that are up on the table? 209 00:19:46,510 --> 00:19:47,870 I would thought you have. 210 00:19:51,430 --> 00:19:52,290 Can we make a move? 211 00:19:52,710 --> 00:19:52,890 Yeah. 212 00:19:53,570 --> 00:19:54,270 Mr. Chair. 213 00:19:54,910 --> 00:19:56,270 What's the title of that? 214 00:19:57,470 --> 00:19:58,330 The parking. 215 00:19:58,550 --> 00:19:59,370 I'll help you with that. 216 00:19:59,410 --> 00:20:00,910 The special parking trail. 217 00:20:01,670 --> 00:20:02,110 Splash. 218 00:20:02,570 --> 00:20:02,830 Practicing. 219 00:20:08,460 --> 00:20:10,260 And on the procurement side of things 220 00:20:10,260 --> 00:20:13,180 for the town, there are a few options. 221 00:20:13,640 --> 00:20:16,960 One of them would be to see if the town will vote 222 00:20:16,960 --> 00:20:24,100 file special legislation to exempt the town from procurement law, for the sale of the law, 223 00:20:24,320 --> 00:20:30,280 which we've done in the past when we wanted to sell a parcel of land to a particular party. 224 00:20:30,600 --> 00:20:36,600 The other idea you could do is a targeted RFP that was favorable for, say, workforce development 225 00:20:36,600 --> 00:20:45,020 parking. So, they'd be a strong proposer if we'd designed an RFP for that type of use. 226 00:20:45,720 --> 00:20:55,940 And I think what would be challenging is the fact that from the road to the end of the 227 00:20:55,940 --> 00:21:03,300 lot, it's a downward slope and it's about an eight to ten foot change. And so you have to 228 00:21:03,300 --> 00:21:11,420 really build up a larger taning wall toward the river and then bring in a substantial amount of fill 229 00:21:11,420 --> 00:21:19,720 to be able to bring this up to grade with the roadway and you would end up spending a lot of money 230 00:21:19,720 --> 00:21:26,260 and if you split the law and we can look at this conceptual artificial intelligence lay over on the 231 00:21:26,260 --> 00:21:32,320 survey map but if you see toward the right hand side of the image there's a dotted line that would 232 00:21:32,320 --> 00:21:38,140 a theoretical subdivision line. You'd end up still having to put in a retaining wall that 233 00:21:38,140 --> 00:21:43,620 would cross over the line so there would be some type of public private partnership that would 234 00:21:43,620 --> 00:21:48,900 have to occur to actually bring this thing up to great fully and that's going to be the majority 235 00:21:48,900 --> 00:21:54,180 of your cost would be bringing in the wall, building the wall to meet civil engineering standards 236 00:21:54,180 --> 00:21:59,160 and then bringing in the fill. So I know that right now with the amount of money that the town 237 00:21:59,160 --> 00:22:05,980 left in the earmark. It's only a couple hundred grand and it's really not anywhere near enough money that 238 00:22:05,980 --> 00:22:11,500 we would need to actually bring this thing up to grade with the road to be able to build a 239 00:22:11,500 --> 00:22:19,980 structural parking lot. That said, potential if the 5058 owner had funds to kick in, 240 00:22:20,300 --> 00:22:27,100 that could go a long way towards getting this project done. So what you have on the screen here, 241 00:22:27,100 --> 00:22:29,980 is a hybrid concept that 242 00:22:30,000 --> 00:22:43,720 That is a combination between a couple ideas. It provides some parking that could be dedicated for workforce housing at 558 South Main Street, the former Carol's Corner. 243 00:22:44,260 --> 00:22:56,720 It also provides municipal parking and riverfront area parking to give viewership to the riverfront, and it also incorporated a small splash park design, 244 00:22:56,720 --> 00:23:07,440 Which would be to attract young families to the town of Orange and offer a new amenity to the taxpayers and this was generated with co-pilot 245 00:23:07,440 --> 00:23:11,170 So I wouldn't stand behind it as far as 246 00:23:11,900 --> 00:23:14,980 Engineering and scalability in scale, but 247 00:23:14,980 --> 00:23:21,860 Certainly it gives us all something to look at that brings color to what is otherwise in our mind. So 248 00:23:21,860 --> 00:23:34,360 This is the hybrid approach that I think might check the boxes for all the concern parties that have interest in this one acre lot. 249 00:23:37,520 --> 00:23:44,700 So what we're looking to do tonight is to get input from the public on what your ideas are. 250 00:23:45,620 --> 00:23:55,260 bring story. And to that end and to move along that proposed, let's say a six minutes, 251 00:23:56,220 --> 00:24:02,460 anybody can get up, say their peace. And you get one chance and we're not going to 252 00:24:02,460 --> 00:24:06,860 get a converse with you, you're just going to tell us what you think and roll right 253 00:24:06,860 --> 00:24:10,140 it down and then we'll take it back and chew on it. 254 00:24:10,140 --> 00:24:19,620 Um, welcome back down the road. Okay. I will free the sea. Thank you. So is there anybody who 255 00:24:19,620 --> 00:24:23,660 wants to comment on your thoughts on the brick pile? 256 00:24:25,680 --> 00:24:26,980 Could be a quick meeting. 257 00:24:32,080 --> 00:24:32,600 I have 258 00:24:32,600 --> 00:24:38,020 a few zoom comments and then I have a few from the public feedback survey. I will start 259 00:24:38,020 --> 00:24:45,180 with the zoom comments. Um, first one and read. I favor allowing for the purchaser of 260 00:24:45,180 --> 00:24:51,180 property and or the town to develop the grounds for needed single-level parking. 261 00:24:52,060 --> 00:24:58,100 I do not believe that to instead reserve the land for public leisure space would provide 262 00:24:58,100 --> 00:25:02,180 worthwhile, sorry, would prove worthwhile by comparison. 263 00:25:02,640 --> 00:25:03,700 Thank you, Anne Reed. 264 00:25:07,640 --> 00:25:14,240 Yes, it's in these enders you are next, Denise Enders is requesting an explanation of all 265 00:25:14,240 --> 00:25:21,280 designs on the table, and I'm just going to add you Denise to as a speaking participant. 266 00:25:22,740 --> 00:25:23,600 Thank you. 267 00:25:25,600 --> 00:25:31,300 I could even thank you for the public hearing to get that you explained it. 268 00:25:31,960 --> 00:25:38,360 So I've been working on this since 2010, this is the fourth ownership group. 269 00:25:38,900 --> 00:25:41,580 A lot of people have come to the table saying what they're going to do. 270 00:25:41,580 --> 00:25:48,680 This current ownership group sounds like they're starting now a year in after several attempts 271 00:25:48,680 --> 00:25:55,200 by the town to get transparency in the partnership. So I'm happy about that. However, I don't 272 00:25:55,780 --> 00:26:01,960 literally trust the deal until there's real money on the table. So if we're interested in 273 00:26:01,960 --> 00:26:07,860 having a hybrid design, I think is very important to get money up front in a long-term lease agreement 274 00:26:07,860 --> 00:26:16,900 for 47 spaces, period, and that lets them know they can develop it, but they're going to put money on the table, partial pay on lease. 275 00:26:17,080 --> 00:26:22,140 So we're not sitting waiting for them to not develop it, okay, and this is a fourth ownership group. 276 00:26:22,360 --> 00:26:29,000 So we've got to learn from the past that we need to have real skin in the game, money, good partnership, transparency. 277 00:26:29,660 --> 00:26:37,420 Because we all would love to see market rate housing in those two historical buildings with spaces needed for them to do that. 278 00:26:37,420 --> 00:26:44,160 Having a beautiful green space next to it not only helps economic development for them, but for this town people see 279 00:26:44,160 --> 00:26:49,840 We care they see beautiful green space on the river and they want to come and build houses and grow their businesses 280 00:26:49,840 --> 00:26:52,920 So it is economic development, even though it's green space 281 00:26:52,920 --> 00:26:58,840 Originally we talked if we're gonna put spaces in to do a two story 282 00:26:58,840 --> 00:27:00,420 parking space 283 00:27:01,020 --> 00:27:02,340 Garage, okay 284 00:27:02,860 --> 00:27:04,260 And that can be done. 285 00:27:04,420 --> 00:27:08,780 I was told, even though we brought fill in, in that two story would be about it to West River, 286 00:27:09,240 --> 00:27:10,340 not about it to the river. 287 00:27:10,760 --> 00:27:13,560 So you got to dig down, build two, get the spaces. 288 00:27:14,240 --> 00:27:20,380 I think it is totally not appropriate to put 100 in some spaces on prime riverfront property 289 00:27:20,380 --> 00:27:25,000 and have just a huge parking lot there. 290 00:27:25,360 --> 00:27:32,320 There's a way to make it work a hybrid, but not flat, one level parking of 104 spaces, no way. 291 00:27:32,760 --> 00:27:38,260 Okay. One, get what we need for those two buildings to be developed, money on the table up front and 292 00:27:38,260 --> 00:27:41,400 at least agreement, and then spend the rest of the money. 293 00:27:41,500 --> 00:27:47,160 The last time we talked about this, Sluck board meeting was 300 grand was in the bank, still. 294 00:27:47,760 --> 00:27:52,820 We had to check economic development, yes, this, he checks that box, and we had to check 295 00:27:52,820 --> 00:27:56,560 environmental, and it was said, let's not spend any more money on Fuss and O'Neill. 296 00:27:57,040 --> 00:27:59,400 So, I'm not sure why the bank counts now down to 200. 297 00:27:59,400 --> 00:28:04,980 whatever it is, we need a good design and we need it. We need a button 298 00:28:04,980 --> 00:28:09,520 button that means we've got to spend some money or ask for an extension which 299 00:28:09,520 --> 00:28:16,800 may not be possible for the town to do its part and then ask those a core LLC 300 00:28:17,900 --> 00:28:23,140 enough of hiding behind who they are and we can't figure it out. That's not a 301 00:28:23,140 --> 00:28:28,180 way to build a relationship and we can get the spaces for them, preserve those 302 00:28:28,180 --> 00:28:33,120 buildings if we work in partnership, we all would love that. But we need real money on the table, 303 00:28:33,540 --> 00:28:39,320 fourth owner, 16 years, and they're falling down. And the owners didn't come to the table until 304 00:28:39,320 --> 00:28:45,820 we put safety requirements on them. Through Jason, thank you, Jason, for doing what you're doing on 305 00:28:45,820 --> 00:28:50,260 safety and good engineering and requiring it to be done right. We haven't done that in the past, 306 00:28:50,320 --> 00:28:57,140 so thank you, Jason. And we should not have had to go that way and initiate a bit of hardball 307 00:28:57,140 --> 00:29:03,740 to say you start fixing these buildings because stuff's flying off those roofs and out of the 308 00:29:03,740 --> 00:29:13,100 windows. So hopefully we can take tonight, get to the table with the owners, co-create, green 309 00:29:13,100 --> 00:29:21,370 space, they're parking space needs, a splash park, keep it up as green space as much as we can 310 00:29:21,370 --> 00:29:27,190 close to the river. Not the other way around and not a whole lot of hundreds 311 00:29:27,190 --> 00:29:33,430 of some spaces. And I'm happy to help. I've been doing that and I'll continue to. Thank you. 312 00:29:33,590 --> 00:29:35,190 Thank you. Thank you, Denise. 313 00:29:36,710 --> 00:29:37,430 Thank you. 314 00:29:40,900 --> 00:29:44,500 Any other participants on Zoom or Zoom QA? 315 00:29:54,090 --> 00:29:55,630 All right. Nobody else? 316 00:29:55,630 --> 00:29:59,970 Um, but okay, okay, then I'll move. 317 00:30:00,000 --> 00:30:02,260 Go on to the survey. 318 00:30:06,530 --> 00:30:18,430 Good evening, Paulie Bixby. When a two-hole she wrote, first of all, I'd like to thank Denise for her time spent putting some thought into this. 319 00:30:18,770 --> 00:30:28,370 And I agree with her that I'm not sure what we can do until we get a commitment from the people on the building. 320 00:30:29,090 --> 00:30:33,870 Because as she said, we have had promises on this kind of stuff for a long time. 321 00:30:33,870 --> 00:30:41,030 I remember talking to other owners, you know, in these past years with a promised everything and then never came through with it. 322 00:30:41,350 --> 00:30:47,830 So what we do depends, it depends a lot upon what these owners do, 323 00:30:47,970 --> 00:30:50,650 whether they're going to actually follow through this project or not. 324 00:30:51,210 --> 00:30:56,750 In the meantime, my own thought is, and it's just my own thought, 325 00:30:56,750 --> 00:31:05,370 that we keep the grass area just as it is and whatever we spend if we have to spend 326 00:31:05,370 --> 00:31:14,830 this $200,000 so that we don't lose it then what can we do so that that won't be interfered 327 00:31:14,830 --> 00:31:21,350 with when this housing project is built and we do the parking lot so maybe we don't do 328 00:31:21,350 --> 00:31:27,970 parking lot because I don't I can't I personally don't see a parking lot there if we don't 329 00:31:27,970 --> 00:31:34,910 have residents in that building we don't yet have residents in Butterfield the old Butterfield 330 00:31:34,910 --> 00:31:40,230 school and that's kind of like a far away for people who are living near to actually park. 331 00:31:41,510 --> 00:31:48,530 So what you would do with that 200,000 I'm not really sure but some thoughts could be 332 00:31:48,530 --> 00:31:55,610 that way you've got the green area and the splash pond I believe I believe it's still 333 00:31:55,610 --> 00:32:02,710 the it is a railroad part of a railroad track and it was a place you go under the track 334 00:32:02,710 --> 00:32:10,190 I'm not sure what you call that under what underpass that's right underpass underneath 335 00:32:10,190 --> 00:32:15,150 that railroad track and I know years ago in a plan it was a thought about making a trail going 336 00:32:15,150 --> 00:32:19,690 to knees there, because that's still, I believe, part of that property, so that could be 337 00:32:19,690 --> 00:32:27,990 cleaned up a bit, past go through there, and maybe even just somehow, so that it wouldn't 338 00:32:27,990 --> 00:32:32,150 be interfered with, but somehow some green, real long, maybe a path along the river. 339 00:32:32,490 --> 00:32:38,530 You see, I'm seeing a lot of several kids and some adults fishing off the bridge, 340 00:32:43,330 --> 00:32:43,510 the 341 00:32:43,510 --> 00:32:51,730 types of things until we can get our act together with that. The people are developing, so that's it. 342 00:32:51,990 --> 00:32:56,490 Comments, sorry to drop that the audio on the mic is not good. Do we want to move this? 343 00:32:59,570 --> 00:33:00,050 Okay, 344 00:33:05,440 --> 00:33:09,460 so those listening, I'm sorry if I broke the mic. I'm not sure. I'm just about 345 00:33:09,460 --> 00:33:14,320 through talking now anyway, but if anybody, I guess those are my only thoughts. 346 00:33:14,320 --> 00:33:20,680 I know at one point there was supposed to be a whole green way going down through that 347 00:33:20,680 --> 00:33:26,060 underpass I'm talking about and along the river all the way down along the river and 348 00:33:26,060 --> 00:33:31,340 there was a lot of work to try to get across the river and the railroad tracks to get 349 00:33:31,340 --> 00:33:39,360 into OIC however I think the stopper was pan-am so we couldn't go through with it so 350 00:33:39,360 --> 00:33:42,140 You know, that's something that was been there in the past. 351 00:33:42,940 --> 00:33:44,360 I guess that's it. 352 00:33:45,180 --> 00:33:45,400 Okay. 353 00:33:48,760 --> 00:33:50,200 App for those who didn't hear it. 354 00:33:50,360 --> 00:33:56,020 You're saying that put the money and to put the money that we have into the green trails. 355 00:33:56,680 --> 00:33:58,460 I think, rather than just wasting it. 356 00:33:58,480 --> 00:33:59,640 I don't think we need to don't study. 357 00:34:00,100 --> 00:34:00,720 Yeah, and don't do it. 358 00:34:00,720 --> 00:34:02,240 And don't do the parking lot. 359 00:34:02,940 --> 00:34:05,040 Until we have a commitment. 360 00:34:05,380 --> 00:34:06,940 But we could take care of the green part. 361 00:34:07,120 --> 00:34:08,300 That's what that's going to mean. 362 00:34:08,300 --> 00:34:11,440 I need to just leave the space kind of as is now there. 363 00:34:11,640 --> 00:34:14,840 The town is the guys are mowing it, it's looking good right now. 364 00:34:15,100 --> 00:34:27,500 Just leave it there until we get a commitment from the developer and then, you know, we move forward and hopefully we get some money from them also to help with the parking lot and I'm not sure where else you get it. 365 00:34:27,500 --> 00:34:35,560 or whatever we get it. We could always go up a center of talent and juggle as something and get some money, but 366 00:34:35,560 --> 00:34:37,580 anyway, yeah, that's my proposal. 367 00:34:39,360 --> 00:34:40,040 Thank you. 368 00:34:42,420 --> 00:34:51,960 I would like to find out if this was cut down in size and so let's just say the 369 00:34:51,960 --> 00:34:56,980 that A parking lots were not there, and that was going to be in space. 370 00:34:58,240 --> 00:35:06,140 What impact would that have on the potential pollution of the site? 371 00:35:10,840 --> 00:35:12,120 Tim, can you come up to that? 372 00:35:13,980 --> 00:35:14,540 In 373 00:35:25,040 --> 00:35:33,860 terms of the site cleanup, I think, regardless of whether it's a parking lot or a park, it 374 00:35:33,860 --> 00:35:39,980 will differ, but a big part of that is going to be the fact that it's raised up and so you're 375 00:35:39,980 --> 00:35:48,480 getting some separation between what the pollution is underneath the old building slab essentially. 376 00:35:50,400 --> 00:35:56,080 You're talking about pollution that's 10-15 feet down from what would be the final grade. 377 00:35:57,060 --> 00:36:03,060 So we'd really want to leverage that fact that there is that separation and the likelihood of 378 00:36:03,060 --> 00:36:09,240 people contacting that pollution is extremely small at that point, but that doesn't necessarily 379 00:36:09,240 --> 00:36:14,780 mean that you could leave it all there under a parks scenario just because it's, you know, 380 00:36:14,940 --> 00:36:20,980 you're attracting children and that has a higher standard of clean up. So it's likely that, 381 00:36:22,440 --> 00:36:26,510 you know, at the park portion of the site, wherever that falls and whatever the extent of it is, 382 00:36:26,510 --> 00:36:35,270 There would probably be some targeted cleanup that would be needed to kind of bring down the overall risk. 383 00:36:35,390 --> 00:36:39,410 You know, Massachusetts is a risk-based program and there's math. 384 00:36:39,790 --> 00:36:42,930 The calculations and risk assessment that goes behind that. 385 00:36:43,910 --> 00:36:51,670 But I do want to make clear that some targeted soil removal under a park concept would likely be needed. 386 00:36:52,410 --> 00:37:01,650 As opposed to the more you dedicate the site to a parking lot where it's not a recreational use, 387 00:37:02,650 --> 00:37:07,070 you know, the amount of solar removal may go down. 388 00:37:08,670 --> 00:37:12,930 But we, you know, I do want to say we haven't gone through the whole risk assessment process yet, 389 00:37:12,970 --> 00:37:17,730 so we would have to look at that, but to kind of sum it up, 390 00:37:17,730 --> 00:37:24,670 more parking lot likely less cleanup more park more cleanup would probably be likely 391 00:37:26,110 --> 00:37:29,850 but you know I think regardless of what you do it could be pretty 392 00:37:30,000 --> 00:37:40,040 Pretty targeted and pretty limited and kind of levers the fact that you have so much filled between, you know, where people are using it and what the pollution would be. 393 00:37:40,400 --> 00:37:48,620 What are your thoughts on if we did a multi-level parking garage in that site? What would be your thoughts on that idea? 394 00:37:48,620 --> 00:37:56,620 as it relates to the contamination or just contamination and set use? 395 00:38:00,900 --> 00:38:08,820 I mean, I guess I'm not a parking expert, but I guess my first question is would there be demand to support two levels of parking? 396 00:38:08,820 --> 00:38:19,000 And I don't know the answer to that, so that would be sort of the first question, what's 397 00:38:19,000 --> 00:38:20,760 the need for that amount of parking? 398 00:38:21,560 --> 00:38:28,200 I mean, Denise had talked about, I think, was accessing the top of the parking, perhaps 399 00:38:28,200 --> 00:38:35,940 from the road, I'm not quite sure, and then around back accessing a lower level from the back. 400 00:38:35,940 --> 00:38:45,440 can we go down because of the contaminant in the soil is there a way to go deeper and make it a 401 00:38:45,440 --> 00:38:53,160 street level at the top level and then a lower level. Yeah, you certainly could. Yeah, I mean there's 402 00:38:53,160 --> 00:38:58,180 nothing to say and you can't do that and you know at that point you're likely going to have to do some 403 00:38:58,180 --> 00:39:04,740 or mobile, but because you're not getting the same kind of separation, 404 00:39:06,800 --> 00:39:07,780 but you're also 405 00:39:07,780 --> 00:39:08,660 paving it. 406 00:39:08,960 --> 00:39:12,980 So all those things are considered as part of the sort of risk assessment and clean up and 407 00:39:12,980 --> 00:39:17,140 like, what do we have to remove to bring this down and meet state standards? 408 00:39:19,980 --> 00:39:25,520 But I guess what I'm not clear on is, you know, if you're going to, I would think if you're 409 00:39:25,520 --> 00:39:31,480 a build of a two-level parking deck, you're dedicating most of that site for that purpose, 410 00:39:31,920 --> 00:39:33,700 or would it be? 411 00:39:34,140 --> 00:39:38,300 I want to think if you did about the same amount of parking, but you did it in two levels, 412 00:39:38,980 --> 00:39:42,300 you're using more vertical space than horizontal space. 413 00:39:43,040 --> 00:39:48,420 So then you have more room for green space if we want a hybrid sort of area. 414 00:39:50,160 --> 00:39:50,180 So... 415 00:39:50,180 --> 00:39:51,600 That's even throw solar on top. 416 00:39:55,260 --> 00:40:03,160 Okay, so the footprint of the theoretical parking deck would kind of match the parking that you're seeing here. 417 00:40:03,160 --> 00:40:04,220 Is that the idea? 418 00:40:04,300 --> 00:40:06,800 Yeah, just for conversation. 419 00:40:07,420 --> 00:40:11,960 Let's say it was half of that, half of that in size, but it went up another level. 420 00:40:12,840 --> 00:40:15,120 So, in thinking what Denise Andrews was saying, 421 00:40:15,120 --> 00:40:44,600 If we could take half of that vertical space and put it on top of the other space, you now access from behind and you go into a lower level, and then you have an upper level that's street accessible, we would have parking for the owners that they wanted, and we could perhaps have that green space that 422 00:40:45,880 --> 00:40:52,870 Um, others wanted. Is that something that's doable to you think? 423 00:40:53,710 --> 00:40:54,050 Um, there. 424 00:40:54,370 --> 00:40:59,690 Well, I guess the question is, you know, are you getting your bang for your bucket at that point? 425 00:40:59,870 --> 00:41:00,950 Because it sounds expensive. 426 00:41:02,790 --> 00:41:03,690 To start to go vertical. 427 00:41:04,470 --> 00:41:04,690 Yeah. 428 00:41:06,430 --> 00:41:12,190 So, I think that would be the first question that would have to be answered. 429 00:41:13,870 --> 00:41:17,530 From a environmental standpoint, yeah, it's certainly doable. 430 00:41:19,950 --> 00:41:24,530 But from an overall construction and return on investment, I guess that's what would 431 00:41:24,530 --> 00:41:26,030 give me pause about that plan. 432 00:41:28,370 --> 00:41:28,710 Thanks, Tim. 433 00:41:29,310 --> 00:41:29,890 You're welcome. 434 00:41:30,790 --> 00:41:30,930 Car? 435 00:41:34,900 --> 00:41:41,680 Microsoft Survey Responses, when we close to the ad for this, we included the Microsoft Survey 436 00:41:41,680 --> 00:41:45,600 It's a QR code and then on the website as well. 437 00:41:45,860 --> 00:41:46,440 Oh, microphone. 438 00:41:47,020 --> 00:41:47,840 Oh, sorry. 439 00:41:49,520 --> 00:41:51,200 I felt like I was missing something. 440 00:41:53,020 --> 00:41:55,540 So we have free survey responses 441 00:41:55,540 --> 00:42:00,040 from a Microsoft Forms from a QR code that was posted 442 00:42:00,040 --> 00:42:02,920 in a newspaper with the hearing ad 443 00:42:02,920 --> 00:42:05,920 and also posted on our website, 444 00:42:06,120 --> 00:42:09,520 via link and the first ones, 445 00:42:09,520 --> 00:42:15,780 admitted anonymously, develop a shared municipal parking and riverfront 446 00:42:15,780 --> 00:42:20,940 comments that supports downtown housing and commercial growth while 447 00:42:20,940 --> 00:42:26,060 creating public access, open space, and unobstructed views of the 448 00:42:26,060 --> 00:42:30,180 Miller's River and Dam. The project should balance economic 449 00:42:30,180 --> 00:42:33,900 development needs with environmental stewardship and provide 450 00:42:33,900 --> 00:42:37,980 a welcoming waterfront destination for residents and visitors 451 00:42:37,980 --> 00:42:48,160 a like. The second is from Vicki, South Main Street Orange. First is the building really 452 00:42:48,160 --> 00:42:50,520 sold with a future plan of development. 453 00:42:53,160 --> 00:42:56,640 Do we want to address that or just read the comment 454 00:42:56,640 --> 00:42:57,200 first? 455 00:42:57,200 --> 00:42:59,560 But let's trust them, just so. 456 00:42:59,580 --> 00:43:05,480 Well, I believe that you've already said that it is that you're 457 00:43:05,480 --> 00:43:07,340 planning on moving forward with us, right? 458 00:43:07,440 --> 00:43:07,660 Right. 459 00:43:08,440 --> 00:43:10,120 So I think that's the answer to a question. 460 00:43:10,280 --> 00:43:11,760 Is it really kind of happened? 461 00:43:12,040 --> 00:43:14,720 Well, there are people that want to make it happen that are here tonight. 462 00:43:16,760 --> 00:43:21,480 So I agree with a couple of comments about money 463 00:43:21,480 --> 00:43:24,860 up front and the skin and the game and all that, but it's only 464 00:43:24,860 --> 00:43:29,200 because aren't just been burned a few times here. 465 00:43:29,800 --> 00:43:31,880 A second comment, same person. 466 00:43:32,560 --> 00:43:34,680 Second, this is a beautiful waterfront location. 467 00:43:35,120 --> 00:43:38,200 Another parking lot would ruin the beauty of it. 468 00:43:38,440 --> 00:43:40,920 But because of the dam, water access activities 469 00:43:40,920 --> 00:43:42,040 would not work. 470 00:43:42,540 --> 00:43:46,000 Not sure if it could be set up as a park for all ages to enjoy, 471 00:43:46,620 --> 00:43:49,860 access for limited parking of food trucks vendor area 472 00:43:49,860 --> 00:43:53,280 to have more weekend set up a vendor selling their wares. 473 00:43:53,280 --> 00:43:57,540 A place for all to enjoy, sit to eat, and relish the view. 474 00:43:58,160 --> 00:44:00,860 A place with some playground equipment for the kids. 475 00:44:01,420 --> 00:44:03,080 A location for vendor tents. 476 00:44:03,320 --> 00:44:09,840 It would take an initiative for somebody to look up grants to see what is available to use for the financing. 477 00:44:13,420 --> 00:44:16,660 And then I have another comment, 478 00:44:16,660 --> 00:44:18,740 anonymously submitted. 479 00:44:20,800 --> 00:44:24,620 Um, calorie crop, food forest demonstration site, 480 00:44:24,980 --> 00:44:30,560 moan, blowgrass, closer to trunks of trees in late spring, 481 00:44:30,880 --> 00:44:34,920 plus moan, wide paths for tick free foot traffic. 482 00:44:35,760 --> 00:44:36,480 Second priority. 483 00:44:37,700 --> 00:44:42,400 Third place hang out spot, open 8 a.m. to midnight daily. 484 00:44:42,400 --> 00:44:50,040 with signage from Main Street and Path well-lit at night and I will add for people who aren't familiar with what a third place means 485 00:44:50,040 --> 00:44:56,140 I believe that means like a place that's like not home or work or school but to just go hang 486 00:44:56,640 --> 00:44:59,980 Third priority mixed use housing and storefront 487 00:45:00,240 --> 00:45:11,040 Fourth, add a bit of handicap access parking, previous, sorry, pervious surface, or covered with pitched roof photovoltaic for winter. 488 00:45:12,760 --> 00:45:23,100 Fifth, a few paid parking places, previous surface, sorry, pervious surface, and then there is no such thing as free parking. 489 00:45:23,740 --> 00:45:28,660 If we make this whole thing into parking, we are shooting ourselves in the foot again. Thank you. 490 00:45:28,660 --> 00:45:34,280 What was the first sentence in that response that we're talking about? 491 00:45:34,520 --> 00:45:35,800 Is there some kind of crop? 492 00:45:36,340 --> 00:45:37,480 Calorie crop. 493 00:45:37,860 --> 00:45:40,340 I don't understand what that is. 494 00:45:40,540 --> 00:45:41,640 Do you know? 495 00:45:42,700 --> 00:45:47,220 I would assume it's a crop that has calories, maybe like corn or something. 496 00:45:48,740 --> 00:45:51,620 Maybe somebody else knows that's savvy. 497 00:45:51,860 --> 00:45:54,160 I open it to the audience. 498 00:45:54,440 --> 00:45:55,960 What a calorie crop is. 499 00:45:56,520 --> 00:45:57,180 I think you're right. 500 00:45:57,180 --> 00:45:58,240 Yeah. 501 00:45:58,820 --> 00:46:04,580 We'll put that into the possibilities as growing corn on the others. 502 00:46:04,580 --> 00:46:04,760 Any other? 503 00:46:07,210 --> 00:46:14,530 Google says it's just a crop with ranked high in calories per square foot, so like sweep 504 00:46:14,530 --> 00:46:15,870 potatoes and stuff. 505 00:46:17,230 --> 00:46:18,130 I don't see any. 506 00:46:18,790 --> 00:46:20,810 Let me take a look at the Q&A. 507 00:46:24,210 --> 00:46:24,850 Okay, 508 00:46:27,920 --> 00:46:33,380 we have a comment from Denise Andrews asking about the decision timeline and process. 509 00:46:37,520 --> 00:46:39,740 I think George 510 00:46:45,280 --> 00:46:48,540 will have 511 00:46:55,800 --> 00:47:02,780 a question on when that was cleaned up. 512 00:47:03,420 --> 00:47:08,360 They didn't clean down to what was the base of the building to begin with. 513 00:47:08,360 --> 00:47:12,040 the cleaner I thought they cleaned it down and took the contaminants out. 514 00:47:13,140 --> 00:47:15,760 I got it to put a machine on that. 515 00:47:17,220 --> 00:47:18,200 Yes, we have. 516 00:47:18,380 --> 00:47:19,440 Tim, no, I'm so excited. 517 00:47:20,380 --> 00:47:20,400 Yeah. 518 00:47:20,460 --> 00:47:21,240 I'll move on with him. 519 00:47:21,500 --> 00:47:22,220 Thank you. 520 00:47:23,640 --> 00:47:24,100 Thank you. 521 00:47:31,410 --> 00:47:35,910 The clean up done two years ago was just of the brick pile. 522 00:47:36,290 --> 00:47:37,570 So the asbestos debris. 523 00:47:38,350 --> 00:47:42,310 And so part of what we've done since then is a more in-depth environmental 524 00:47:42,950 --> 00:47:49,010 investigation that went into the ground. So below, like where the building slab was. So all that 525 00:47:49,010 --> 00:47:53,750 brick was sitting on top of the building slab. Right. That's what Scott removed. Once that was removed 526 00:47:53,750 --> 00:47:59,590 then we did the more in-depth investigation and found it. We understand that the only asbestos 527 00:47:59,590 --> 00:48:12,290 contamination was in the glazing of the window, which was minimal. Right. Well, they blew it all out of 528 00:48:13,110 --> 00:48:17,290 is where of the windows was the potential 529 00:48:18,750 --> 00:48:19,870 asbestos problem. 530 00:48:20,610 --> 00:48:22,410 Well, if you stopped and think about that, 531 00:48:22,410 --> 00:48:25,850 compared to that building, that's not much contamination. 532 00:48:26,710 --> 00:48:26,970 Right. 533 00:48:27,590 --> 00:48:28,190 Maybe so. 534 00:48:28,910 --> 00:48:29,970 I don't know the answer. 535 00:48:30,150 --> 00:48:31,170 Well, I've lived here for ages. 536 00:48:31,170 --> 00:48:31,490 Right. 537 00:48:32,650 --> 00:48:33,610 You could be right. 538 00:48:34,410 --> 00:48:38,150 I didn't see any full survey of what the asbestos 539 00:48:38,150 --> 00:48:39,970 wasn't that building before it burned down, 540 00:48:40,210 --> 00:48:41,450 but once it was down, 541 00:48:42,650 --> 00:48:49,530 There's really no way to know or at least be able to segregate it in a way that is efficient. 542 00:48:50,350 --> 00:48:57,230 The way it was spoken at the time was that the only past-best contamination was what was in the glazing of the windows. 543 00:48:57,810 --> 00:48:59,950 Yeah, I can't even get any more when it burned. 544 00:49:00,470 --> 00:49:08,830 I can't say that the work that was done immediately after the fire, the D.P. led, there was 545 00:49:08,830 --> 00:49:14,530 record that there was pieces of a specialist that had sort of become airborne and landed 546 00:49:14,530 --> 00:49:17,110 in other parts of town and other properties. 547 00:49:18,550 --> 00:49:22,330 So that is part of the record, I can't verify that. 548 00:49:22,330 --> 00:49:24,270 I didn't see some of the floating around that day. 549 00:49:25,170 --> 00:49:25,570 Right. 550 00:49:27,330 --> 00:49:38,330 I believe that when we met in May, there was a statement that there is contamination on 551 00:49:38,330 --> 00:49:38,750 the site. 552 00:49:39,010 --> 00:49:46,490 It's deep underground and it would preclude us from using it for residential or daycare 553 00:49:46,490 --> 00:49:50,770 center or some things that would be very sensitive, but it's so deep and so expensive 554 00:49:50,770 --> 00:49:58,590 to get it out. Yeah. We can do things on top without any risk. Well, the comment would be 555 00:49:58,590 --> 00:50:03,330 that historically, if somebody was talking about access with the threshold going across 556 00:50:03,330 --> 00:50:10,210 it, go to Javanese. Historically, the railroad has been very reluctant to let anybody on the 557 00:50:10,210 --> 00:50:10,650 property. 558 00:50:14,040 --> 00:50:16,400 Yeah, I don't know whether the railroad even knows it. 559 00:50:18,620 --> 00:50:20,920 But then you got to maintain it 560 00:50:20,920 --> 00:50:29,500 forever. So that's the downside. Because I, as a kid, I remember the, the paper mill 561 00:50:29,500 --> 00:50:34,080 using is a storage, and I remember switches pushing cars into that building. 562 00:50:36,230 --> 00:50:36,870 Thank you. 563 00:50:40,890 --> 00:50:41,530 Paulie? 564 00:50:42,590 --> 00:50:45,030 I think I'll stand. 565 00:50:47,350 --> 00:50:48,630 You can pull it. 566 00:50:49,050 --> 00:50:49,970 I just have a chair. 567 00:50:50,550 --> 00:50:51,090 I just have a chair. 568 00:50:51,330 --> 00:50:51,450 Yeah. 569 00:50:51,450 --> 00:50:56,430 Yeah, probably big speed again. I just have a question like looking at the map 570 00:50:56,430 --> 00:50:58,170 We've got the splash pond 571 00:50:59,190 --> 00:51:03,850 There that green area. Is that beyond the contamination point? 572 00:51:04,050 --> 00:51:09,730 Because I think if you go there and look the people whose property is as I'm looking at this map 573 00:51:10,150 --> 00:51:15,830 The property to the left. They have a fence and then there's a lot of you know a lot of 574 00:51:15,830 --> 00:51:21,530 The debris and stuff that's growing up there is a big huge tree that fell across that area 575 00:51:22,150 --> 00:51:25,450 But is that the area we're talking about right there? 576 00:51:26,630 --> 00:51:33,690 So and if that's off the contamination thing then then the way this is drawn that being a park 577 00:51:33,690 --> 00:51:37,290 You don't have to go and check for all the contamination 578 00:51:38,350 --> 00:51:45,270 Right, I will say so the contamination that we found or that I guess the biggest issue in terms of 579 00:51:45,270 --> 00:51:52,490 Risk is arsenic, so an arsenic's very common in urban fill this whole area was fill 580 00:51:53,110 --> 00:51:56,310 You know dating back to it's a original development, so 581 00:51:59,270 --> 00:52:05,070 It's sporadic I guess is what I'm saying in this we go walk on the property right right right, right? 582 00:52:05,350 --> 00:52:12,030 Right, so you know if you're gonna do like a walking path and and you know things of that nature then you know 583 00:52:12,670 --> 00:52:22,050 It's that kind of sort of targeted clean up that I'm talking about where you're focusing the money and the effort to do it on, you know, the highest risk areas. 584 00:52:23,570 --> 00:52:29,770 And that part of the site is sort of, you know, we didn't fill as much there because it was already close. 585 00:52:30,000 --> 00:53:01,740 I don't think there's any fillings of the grade, like in my fill, I mean the recent work, when we brought in all the back fill out to the brick pile was gone. So, but I guess what I'm getting at is the contaminations kind of sporadic site wide, because it's an, okay, I guess what I'm, what I'm kind of getting at is kind of like what I said before is that if you have to spend the money, and we don't like to throw away money, then that's a lot of money. 586 00:53:01,760 --> 00:53:07,100 area if there's no can if there's the building wasn't there I don't think I think there's 587 00:53:07,100 --> 00:53:11,820 enough room between where the building was and where it fell down and where the end of 588 00:53:11,820 --> 00:53:18,060 that property is and that trestle is in that area but you know it got to have boots on the ground 589 00:53:18,060 --> 00:53:22,820 you got to go look at it so this is like what how can we tell by looking at this what happened 590 00:53:22,820 --> 00:53:28,440 to that part of the property was that was where their coal stores was because that's where all the 591 00:53:28,440 --> 00:53:34,080 You know that that's where everything came in on that train trussle so that even though there wasn't a building there that was still 592 00:53:35,040 --> 00:53:37,780 A part of the site where the land use was kind of 593 00:53:37,780 --> 00:53:41,840 What we will consider now a polluting land use where you're piled up coal and 594 00:53:42,520 --> 00:53:46,700 Ash and things like that, so maybe maybe I don't remember unlike George 595 00:53:46,700 --> 00:53:49,840 Old time or so, okay 596 00:53:58,700 --> 00:54:02,660 Okay, we have a handraise. This is Denise Andrews. 597 00:54:05,260 --> 00:54:05,300 Hi 598 00:54:05,640 --> 00:54:12,560 Thank you for having the public hearing, some really great ideas on solar and pop-up food 599 00:54:12,560 --> 00:54:15,360 tracks and community space to hang. 600 00:54:16,660 --> 00:54:22,680 There's not enough data for me, and as an engineer in particular, say nothing about financial 601 00:54:22,680 --> 00:54:23,500 conservative. 602 00:54:25,080 --> 00:54:31,680 We're talking a lot about arsenic and lead on science rules. 603 00:54:32,220 --> 00:54:33,800 We do ground samples. 604 00:54:33,800 --> 00:54:40,500 We've done some, we've spent a lot of money already on Brownfield cleanup money, taxpayer money on this site. 605 00:54:41,200 --> 00:54:47,780 So I would encourage all of us to get the data and come from the science on that. 606 00:54:47,960 --> 00:54:57,400 When we had the pocket park, we had lead over there and one of the creative concepts was to plant sunflowers, which decontaminates the site. 607 00:54:57,400 --> 00:55:07,020 So there are wonderful ways to do this at a lot less cost than expensive consulting and not going to the source called sampling. 608 00:55:07,920 --> 00:55:09,580 So that's one point. 609 00:55:09,880 --> 00:55:15,560 And the second is in Rome D and C. 610 00:55:16,000 --> 00:55:16,820 Kelly's right. 611 00:55:17,020 --> 00:55:22,880 I mean if we cut in half, 50 on the lower level, 50 on street level, two story, 612 00:55:23,580 --> 00:55:26,660 get the construction cost and I hear that the owners are willing to pay. 613 00:55:26,660 --> 00:55:33,240 So let them pay for half, okay, let the town, right, or get a lease, so that it pays out in 10 years. 614 00:55:33,700 --> 00:55:42,200 So there's a lot of great ideas here tonight, and I think at the end of the day, we have to move fairly efficiently, high quality, low time, 615 00:55:42,540 --> 00:55:48,860 get a decision so that we can have a concept that makes sense for economic development and quality of life. 616 00:55:49,020 --> 00:55:50,940 And again, thanks for the public hearing. 617 00:55:51,740 --> 00:55:54,860 Thank you, did you want else? 618 00:55:57,840 --> 00:55:58,200 Cora? 619 00:56:03,720 --> 00:56:04,080 Nope. 620 00:56:14,920 --> 00:56:16,580 I think Reinic West Main Street. 621 00:56:18,040 --> 00:56:21,560 So for those talking about the two layers, two levels. 622 00:56:21,980 --> 00:56:30,440 Are you talking about the AB section having parking over the lower level of AB as well? 623 00:56:30,660 --> 00:56:36,880 So that you're actually talking about a double decker over the AB section and the CD section is kind of the entry level? 624 00:56:37,820 --> 00:56:44,020 ground level, like can we two to level, not sure they've decided where to do that. 625 00:56:44,060 --> 00:56:49,220 My concern about doing something like that is the green space on the north side of the 626 00:56:49,220 --> 00:56:54,840 green walk, the idea, you'd be shading it, so it'd be hard to get things to grow there 627 00:56:54,840 --> 00:57:00,920 because the construction would create a shade on that, because the south is the side of the 628 00:57:00,920 --> 00:57:04,600 world that you can't get, that's the bottom, and that's the north up there. And growing things 629 00:57:04,600 --> 00:57:06,580 on the north side is really, really tough. 630 00:57:06,900 --> 00:57:09,520 I have spots in my yard where I just can't get things to grow, 631 00:57:09,660 --> 00:57:11,980 because it's the north end of the month. 632 00:57:15,840 --> 00:57:17,920 The contaminants that we're talking about 633 00:57:17,920 --> 00:57:20,800 are not the asbestos and such from the building, 634 00:57:20,860 --> 00:57:22,480 we're talking about the contaminants 635 00:57:22,480 --> 00:57:25,640 of a long-term manufacturing use that get deep into the soil 636 00:57:25,640 --> 00:57:29,260 in various ways that those of us who don't do manufacturing 637 00:57:29,260 --> 00:57:30,580 really know nothing about, 638 00:57:30,660 --> 00:57:33,180 but that's the kind of contaminant you're talking about, 639 00:57:33,180 --> 00:57:36,380 not built construction contaminants. 640 00:57:36,600 --> 00:57:37,000 That's right. 641 00:57:37,360 --> 00:57:39,240 And also urban fill contaminants. 642 00:57:39,660 --> 00:57:42,140 So it's very common in urbanized areas 643 00:57:42,880 --> 00:57:46,540 to have contaminated fill. 644 00:57:46,580 --> 00:57:49,640 You know, way back before environmental regulation, 645 00:57:49,880 --> 00:57:53,040 they would use anything to build up grades 646 00:57:53,040 --> 00:57:54,900 for development on sites. 647 00:57:55,440 --> 00:57:59,040 And the biggest issue is ash and coal. 648 00:57:59,860 --> 00:58:02,940 And ash by product that got put in the ground. 649 00:58:02,940 --> 00:58:10,120 and used to build up sites, so it's all over New England, and so that's part of the issue here. 650 00:58:10,480 --> 00:58:17,580 The other issue is that building burned down and created its own ash and concentrated chemicals 651 00:58:17,580 --> 00:58:26,880 just from wood and pre-ISO oil, and so that got into the ground as a result of the fire. 652 00:58:26,880 --> 00:58:37,800 So it's hard to decipher what's what in that scenario, whether it was Urban Phil or from the fire or spilled during the industrial history. 653 00:58:37,960 --> 00:58:39,000 And we have seen some of that. 654 00:58:39,060 --> 00:58:45,620 There's some solvents in the ground to not super high levels, but they are there. So it's a combination of things. 655 00:58:48,490 --> 00:58:55,370 I'm thinking at the moment, the state has a high desire for more housing and a high desire for more economic development, 656 00:58:55,370 --> 00:58:59,370 especially in this part of the state to have us get both of those. 657 00:59:00,110 --> 00:59:03,970 So it would seem to me that the parking, that's, 658 00:59:04,690 --> 00:59:07,410 that housing is not going to be possible in those buildings. 659 00:59:07,890 --> 00:59:10,070 It was, there's parking space. 660 00:59:10,470 --> 00:59:13,610 I mean, nobody is really going to invest in any of those buildings 661 00:59:13,610 --> 00:59:16,550 if there isn't also the ability to park that parking. 662 00:59:17,030 --> 00:59:19,910 So it seems to me a priority for us if we want those buildings 663 00:59:19,910 --> 00:59:23,650 development should be some way of working out that parking. 664 00:59:23,650 --> 00:59:30,670 at least that portion of the lot that's needed for them to have parking, and whether it's a sale, 665 00:59:30,950 --> 00:59:32,210 a lease, or whatever, 666 00:59:34,270 --> 00:59:38,410 that to me, the development of those buildings, should be one of our priorities. 667 00:59:39,390 --> 00:59:43,090 And that makes that parking a priority. And what we do with the rest of the lot, whether it's more 668 00:59:43,090 --> 00:59:51,710 parking, more park, to me as I looked over that area, I'm not very spatially, not never a good 669 00:59:51,710 --> 00:59:56,710 imagining things. So it did not look big enough to hold all of this. So I'm going to 670 00:59:56,710 --> 00:59:59,970 to trust the design calculation that that's... 671 01:00:00,000 --> 01:00:07,640 That actually all fit in there. The, obviously, the design would have to change from that because the public 672 01:00:07,640 --> 01:00:13,960 section would need accessible parking spaces as well as the private section. So, obviously, it won't be the full number of 673 01:00:13,960 --> 01:00:22,060 spaces that's shown there, because they'll have to be sum over near the picnic area. But to me, this kind 674 01:00:22,060 --> 01:00:27,800 of conceptual exactly how far over the line gets drawn is to how much is park and how much is parking, 675 01:00:27,800 --> 01:00:33,600 And whether some of the parking gets left non-parking so that you can put in food trucks or whatever, 676 01:00:34,000 --> 01:00:41,840 which might require a electrical connection or something, whether to put in for electrical cars, 677 01:00:42,060 --> 01:00:43,640 all that kind of stuff comes later. 678 01:00:44,180 --> 01:00:50,540 The moment plan is a decision of whether to go ahead with planning that some of this gets used 679 01:00:50,540 --> 01:00:55,280 for parking for the neighbor and what we need to do next steps for whatever we're going to do. 680 01:00:55,280 --> 01:01:11,520 What it sounds like, that one of the things that we need to do is the testing of just how deep the contaminants are can we actually put a park over a part of this or would that be extremely expensive because of how much would have to be done. 681 01:01:11,520 --> 01:01:29,600 And then the next plans is getting to design and putting in for the grants to try to get assistance with the town's portion of this construction because of it being good for attracting both housing and economic development into the downtown. 682 01:01:31,180 --> 01:01:31,800 Thank you. 683 01:01:32,040 --> 01:01:32,960 Thank you. 684 01:01:36,800 --> 01:01:37,180 Thank you. 685 01:01:37,500 --> 01:01:38,060 Excuse me. 686 01:01:47,040 --> 01:01:48,720 Excuse me. 687 01:01:49,560 --> 01:01:51,500 And we can't hear you. 688 01:01:55,050 --> 01:01:57,630 Did you read to raise your hand? 689 01:01:58,470 --> 01:01:59,770 Can you type in the chat? 690 01:02:05,360 --> 01:02:06,540 I respond to that. 691 01:02:09,000 --> 01:02:17,300 So, I mean, I didn't really think about if we take the C&D and put it over A and B, 692 01:02:17,640 --> 01:02:19,260 we could do that, perhaps. 693 01:02:19,700 --> 01:02:21,240 Whatever would fit best in the space, 694 01:02:21,740 --> 01:02:23,320 or my thought when I first was thinking, 695 01:02:23,740 --> 01:02:27,180 it was just taking sort of right down the middle 696 01:02:27,180 --> 01:02:35,600 and push it double height towards the housing and then you'd leave the left over 697 01:02:35,600 --> 01:02:41,440 green space. But when you were saying these I was loving the thought of that space 698 01:02:41,440 --> 01:02:49,180 for food trucks without parking places there would be great and perhaps if we could 699 01:02:49,180 --> 01:02:54,280 get grant money to do you know some charging stations we could do maybe perhaps 700 01:02:54,280 --> 01:03:01,160 solar that could get some money revenue for the town. These are real great brainstorming ideas 701 01:03:01,160 --> 01:03:08,960 to that we needed on the site. That's what we wanted. Yeah, and the other part well we're 702 01:03:08,960 --> 01:03:17,320 right too is I mean is there a way since Kathy you're here too that we could have the owners put 703 01:03:17,320 --> 01:03:23,680 money into an escrow account of some sort where we hold the money so that we know that they've 704 01:03:23,680 --> 01:03:29,240 If they're investing money towards it, like we know that they mean business, is there 705 01:03:29,240 --> 01:03:32,820 some way that a town can do that? 706 01:03:38,240 --> 01:03:39,120 I'm not sure of that. 707 01:03:39,120 --> 01:03:43,240 The best person to answer this, but back when I was on the planning board years and years 708 01:03:43,240 --> 01:03:47,580 ago, planning boards could require escrowing of various kind of things. 709 01:03:47,760 --> 01:03:53,900 For instance, all of our solar farms, as far as I know, have escrowed money for decommissioning. 710 01:03:54,660 --> 01:03:57,620 So that would be part of the planning board process, I think. 711 01:03:57,620 --> 01:04:03,660 If there was something like that going on, I don't know if there's any other process open 712 01:04:03,660 --> 01:04:04,600 to the town. 713 01:04:05,520 --> 01:04:09,900 I would guess that if we're creating a public private partnership, the part of that partnership 714 01:04:09,900 --> 01:04:15,680 agreement could be money's put into escrow early on in the partnership so that we have 715 01:04:15,680 --> 01:04:17,820 it available as the partnership continues. 716 01:04:18,320 --> 01:04:25,720 The town could accept money from developers for our specific purpose, such as developing 717 01:04:25,720 --> 01:04:30,800 parking, it's certainly something we've done in recent years. 718 01:04:32,750 --> 01:04:35,050 Can you give up on the end read? 719 01:04:35,190 --> 01:04:37,410 She's a two type that was an accident. 720 01:04:37,830 --> 01:04:38,890 Oh, okay. 721 01:04:39,010 --> 01:04:44,040 Any other comments last going once? 722 01:04:44,360 --> 01:04:44,920 Going twice? 723 01:04:45,720 --> 01:04:45,920 Yes. 724 01:04:47,540 --> 01:04:48,300 Didn't bring you down. 725 01:04:48,600 --> 01:04:49,420 So you're a little safer. 726 01:04:49,420 --> 01:04:52,620 All right, 727 01:04:56,780 --> 01:04:58,720 Mary Wolf 40 East Merkel, 728 01:05:01,220 --> 01:05:07,900 my only thought is that if we left this as a full parking 729 01:05:07,900 --> 01:05:14,740 lot like this, it's much more scalable, maybe we could have little carnivals, 730 01:05:16,960 --> 01:05:19,060 the green 731 01:05:19,060 --> 01:05:22,560 market, the local farmers market, could go there. 732 01:05:23,140 --> 01:05:25,880 It's a lot closer to the middle of town. 733 01:05:27,360 --> 01:05:30,220 It kind of is out and left field right now. 734 01:05:33,980 --> 01:05:36,660 And then if you wanted to build later, 735 01:05:37,720 --> 01:05:41,140 double parking lot, you can do it. 736 01:05:41,520 --> 01:05:45,580 But for now, I think, you know, we have very little money. 737 01:05:45,580 --> 01:05:55,860 It would be nice to, you know, put that macatum on there and then we could use it as a center of count. 738 01:05:56,020 --> 01:06:00,240 And we used to have a third Thursdays, that's all gone. 739 01:06:00,840 --> 01:06:14,840 So this is an important piece of count and I would just suggest leaving it the way this is actually pretty good for, as I can say, for our budget. 740 01:06:14,840 --> 01:06:20,120 I mean, if it was my property, that's what I would do and build on it. 741 01:06:22,040 --> 01:06:22,660 Thank you. 742 01:06:22,660 --> 01:06:23,660 Thank you. 743 01:06:25,520 --> 01:06:27,720 Mr. Manager, do you have anything? 744 01:06:30,770 --> 01:06:36,450 Do you have the snow as landscaping design that we should put on the screen before we wrap up? 745 01:06:51,030 --> 01:06:52,150 I don't know. 746 01:06:52,150 --> 01:06:53,450 I don't know. 747 01:06:53,530 --> 01:06:54,670 I don't know. 748 01:06:54,710 --> 01:06:58,090 I don't know. 749 01:06:58,090 --> 01:07:05,050 area and go down deep enough so you would know how father contaminants came from when the new home 750 01:07:05,050 --> 01:07:10,410 was there and you wouldn't have to excrete the whole thing, but do course samples and you 751 01:07:10,410 --> 01:07:17,430 get a pretty good idea on that. Yeah, we did that. You did do course samples, okay. Okay, because 752 01:07:17,430 --> 01:07:22,110 you know, it wasn't explained it and say well we got this and we got that but it wasn't saying 753 01:07:22,110 --> 01:07:27,150 how you got to, so you did course samples and that's how you got contaminants. Yeah. Okay, we did 754 01:07:27,150 --> 01:07:29,970 And then I'm sad that our main meeting with... 755 01:07:30,000 --> 01:07:34,100 They met with us. They were talking to us about what they actually found. 756 01:07:34,680 --> 01:07:35,280 Right. Right. 757 01:07:35,400 --> 01:07:39,640 We'll have a work construction for about 40 from my years. I guess I might, you know, 758 01:07:39,680 --> 01:07:42,080 a little expertise in what you can do to find it. 759 01:07:42,100 --> 01:07:43,180 Yeah. Yeah. 760 01:07:43,620 --> 01:07:44,820 Thank you. Thank you. 761 01:07:44,900 --> 01:07:45,100 Thank you. Thank you. 762 01:07:45,140 --> 01:07:50,460 Thank you. So we have on the board right now designed by Snowinson. 763 01:07:51,620 --> 01:07:53,120 Do you want to speak to it, Matt? 764 01:07:54,080 --> 01:07:56,820 Sure. So this is a landscaping design. 765 01:07:56,820 --> 01:08:02,500 It wouldn't be a complete design plan that you could go out to bed with, but it's a really great conceptual 766 01:08:03,240 --> 01:08:06,240 scale drawing of what a 767 01:08:06,240 --> 01:08:11,380 Potential walking park would look like here. So you have a trail 768 01:08:11,380 --> 01:08:21,800 Within the park with specific tree plannings and then a proposed splash pad with a parking area in the center and then another parking area to the north 769 01:08:22,460 --> 01:08:29,480 or to the southwest. This is flipped upside down. So this is another idea that we 770 01:08:29,480 --> 01:08:35,120 wanted to put in front of the board. This is drawn by a human unlike the 771 01:08:35,120 --> 01:08:40,540 last drawing, which is drawn by AI. But this is another approach. I've been 772 01:08:40,540 --> 01:08:44,100 having a really hard time getting a straight answer. I know a fan's out of 773 01:08:44,100 --> 01:08:48,960 Fresno Niel about what if this is feasible knowing the current underground 774 01:08:48,960 --> 01:09:07,460 conditions and whether or not we could bid out something like this now or if if we would need to do targeted solar removal and I think that's kind of the struggle for us right now is that Tim doesn't have the full answer yet and we only have a few months with the money to 775 01:09:07,460 --> 01:09:10,480 essentially clean up after the fire. 776 01:09:10,760 --> 01:09:14,240 So the brick pile of your mark was to clean up after the fire. 777 01:09:15,120 --> 01:09:18,320 So it's job is done and we're trying to deploy it 778 01:09:18,320 --> 01:09:19,860 in a strategic way. 779 01:09:20,100 --> 01:09:21,800 Tim and I have been trying to brainstorm ways. 780 01:09:22,400 --> 01:09:26,240 We can spend down this money efficiently by the end of December. 781 01:09:27,180 --> 01:09:31,360 So we're really trying to understand what the town wants to see here 782 01:09:31,360 --> 01:09:34,320 so that we can move forward our efforts. 783 01:09:34,320 --> 01:09:43,520 Fuston O'Neil has paused the elements of the contract that we signed with them a few months ago that we're related to designing so 784 01:09:45,220 --> 01:09:49,680 That's still baked into we had a hundred ninety one thousand dollar contract with Fuston O'Neil 785 01:09:49,680 --> 01:09:55,700 We spent about 50,000 there's about a hundred and forty thousand balance on that contract that's itemized 786 01:09:57,400 --> 01:10:02,340 And if we're knocking I use that part of the contract and we want to shift things around 787 01:10:02,340 --> 01:10:07,200 there might be more than $200,000 left, but no matter what we do, we don't have a whole 788 01:10:07,200 --> 01:10:14,140 lot of time. And whatever we do, I really need to go back to DP and say, this is what we're 789 01:10:14,140 --> 01:10:21,200 going to do. Is this something you'll reimburse? And so they were fine with us, redeveloping the 790 01:10:21,200 --> 01:10:30,560 parking lot for, who was it great upon about a year ago as a parking lot with a green elements. 791 01:10:30,560 --> 01:10:35,180 So they said if you could do parking to resource and buy it to the lot 792 01:10:35,180 --> 01:10:42,720 It also would help contain any remaining contaminants and they also said you if you can make a green that would be better since it's better for the environment 793 01:10:44,060 --> 01:10:46,780 So I don't think that DEP would be against 794 01:10:47,680 --> 01:10:50,800 More of a recreational type park, but we would need to know 795 01:10:50,800 --> 01:10:54,380 From the environmentalists on the job 796 01:10:54,380 --> 01:10:57,740 What what's feasible and that's what we really need to know 797 01:10:58,420 --> 01:11:04,200 quickly, and then we need to know from the board where they want to go with this piece of land, too. 798 01:11:12,070 --> 01:11:13,490 What's feasible in terms of cleanup? 799 01:11:13,650 --> 01:11:15,850 We need to know what the end point is. 800 01:11:16,030 --> 01:11:20,530 Like I'll say in earlier, it's different if it's a parking lot versus a park. 801 01:11:21,090 --> 01:11:29,190 So that sort of part of the reason behind the pause is, you know, we need to kind of understand what the town wants, 802 01:11:29,190 --> 01:11:33,890 And then that kind of informs what the cleanup would cost and, you know, what it would look like. 803 01:11:35,310 --> 01:11:44,590 It sounds like it sounds like the, the, everybody is sort of consistently saying that we need the parking, 804 01:11:44,930 --> 01:11:50,270 but we want some, it's like a hybrid of both. That's what it sounds like. So, 805 01:11:51,830 --> 01:11:58,050 it just matters how we spend, like we don't want to lose that money and we can't save that money, right? 806 01:11:58,050 --> 01:12:03,650 So then how do we how do we best because that's like that's the 807 01:12:03,650 --> 01:12:10,370 This wasn't like a grant type money. This was an earmark. So essentially there was a 808 01:12:10,370 --> 01:12:13,290 Disaster's fire and orange and 809 01:12:13,290 --> 01:12:21,170 Suzy webs and Joe come afird a petitioned in the court to get us money that essentially is derived from our befunding 810 01:12:22,050 --> 01:12:27,130 And our befunding had to be spent in general by December 31, 2026 811 01:12:28,250 --> 01:12:33,950 So the chances of an extension are probably pretty low. I'm still going to see if we can do it 812 01:12:35,130 --> 01:12:40,250 But it wasn't like a grant to build a park. It was a grunt. It was a hear mark 813 01:12:40,250 --> 01:12:46,310 Too clean up the asbestos late in bricks, right, but we want but we want to be 814 01:12:46,310 --> 01:12:51,650 So mindful right of making sure we use that money if we have a plan 815 01:12:51,650 --> 01:12:57,830 I had a that we wanted to do something like this. Let's use that money that's gonna benefit us for this next project 816 01:12:57,830 --> 01:13:00,550 right, that's what we're trying to do. 817 01:13:02,050 --> 01:13:11,050 So what I heard was that there's a strong interest to provide parking to enable the economic 818 01:13:11,050 --> 01:13:19,810 development of the Carol's Quarter. However, since we've been down this road more than once, 819 01:13:20,510 --> 01:13:26,730 we don't want to close this door in anticipation of that happening. So I think that's the 820 01:13:26,730 --> 01:13:35,830 conundrum for me is that if a core capital is going to do it, we need some kind of good faith 821 01:13:35,830 --> 01:13:42,630 soon to let us know that, yeah, it is worth while setting aside essentially half of that 822 01:13:42,630 --> 01:13:52,090 lot for parking and we've been here before, we need to know and the building permits would 823 01:13:52,090 --> 01:13:57,470 the engineering would help all these things but we have a time line deadline from the 824 01:13:57,470 --> 01:14:02,650 rest of it. We have a lot of money to me a lot of money resting on that that goes 825 01:14:02,650 --> 01:14:09,110 out at the end of the year. I think at this point too, putting a financial, a financial 826 01:14:10,390 --> 01:14:16,230 piece to show that they're really, spin in the game. Right. I think that that's really 827 01:14:16,230 --> 01:14:21,130 important. What do you think David on that? Well, yeah. I mean, anything we can do to 828 01:14:21,130 --> 01:14:27,850 encourage them to get involved in it would be a good move for sure. We have in front of us 829 01:14:27,850 --> 01:14:32,970 two very thorough plans, two thought-out plans, and I'm wondering as I'm looking at them, 830 01:14:33,150 --> 01:14:39,230 as maybe they can be combined a little bit better. I don't know that we need all those 831 01:14:39,230 --> 01:14:45,410 parking spots, but maybe if we added the ones that they want, plus some others, that would give us 832 01:14:45,410 --> 01:14:52,530 more green space, that green space can be turned into a parking lot anytime if something comes up. 833 01:14:52,890 --> 01:14:59,970 But at least we have the green space to use in the near future until we get to a point that we need to... 834 01:15:04,480 --> 01:15:20,660 One of the things I thought about doing was seeing if we couldn't procure material for any beneficial use of the lot, for example, almost no matter what we do, we're going to need to build a retaining wall. 835 01:15:20,660 --> 01:15:31,240 And while we don't have enough money to build a retaining wall, we may have a decent amount of walls we could buy and get walls on site, 836 01:15:31,620 --> 01:15:40,200 so that we could have some materials on hand that could be used for anything that happens down the road, 837 01:15:40,300 --> 01:15:47,520 since we don't have a lot of time to spend money. And so that could be a good way to deploy capital now, get materials on site, 838 01:15:47,520 --> 01:15:58,060 And then go forward with a design, pursue additional grant money down the road next year, for example, to get to that end target. 839 01:15:59,420 --> 01:16:10,700 And even with the designing, I mean, we can work out a properly engineered design plan that incorporates elements of snow landscape design, the drawings, the survey. 840 01:16:11,420 --> 01:16:16,520 But even with that set of design plan, you're going to want to have a design hearing before 841 01:16:16,520 --> 01:16:17,740 we get a final design. 842 01:16:18,420 --> 01:16:24,820 So even if we could probably work out a design in this second quarter of the fiscal year, 843 01:16:25,160 --> 01:16:30,020 we wouldn't be looking at a design hearing until next January, February, anyway. 844 01:16:30,960 --> 01:16:38,900 So for me, spend as much to get a marketable design ready to see if we can't procure material 845 01:16:38,900 --> 01:16:43,980 for the site that could be used in any case, that way we can spend down the money without 846 01:16:43,980 --> 01:16:47,360 we do have and then pursue additional funds next year. 847 01:16:53,420 --> 01:16:58,200 It sounds like, no matter what we do, we need to bring a lot of fill in to level it. 848 01:16:58,500 --> 01:17:00,580 So there's the right expense right there. 849 01:17:00,900 --> 01:17:03,600 We could bring in more fill just to get it higher up. 850 01:17:03,820 --> 01:17:12,520 So even then, between those two elements, we could spend down cash and it also achieves 851 01:17:13,480 --> 01:17:18,500 environmental goals if we bring in more fell make it more level we further separate ourselves 852 01:17:18,500 --> 01:17:21,740 from the underground contaminants that are concerned as well. 853 01:17:21,940 --> 01:17:25,560 Since I think a beatman is going to be impossible. 854 01:17:25,700 --> 01:17:28,700 I don't know if we could fully debate the law. 855 01:17:28,880 --> 01:17:29,640 What do you think, Tim? 856 01:17:30,220 --> 01:17:32,360 I think you'd need to fully debate it. 857 01:17:32,580 --> 01:17:34,100 No, I think you can leave some contamination. 858 01:17:34,520 --> 01:17:38,560 It's just a matter of, you know, a more targeted approach. 859 01:17:43,360 --> 01:17:45,060 other comments. 860 01:17:47,690 --> 01:17:54,710 So it sounds like the thing on the table that is to deal with a 861 01:17:54,710 --> 01:18:02,190 court company about coming up with reassurances for arms that this is going to move 862 01:18:02,190 --> 01:18:08,490 forward. And that's what we're looking for. And that being said, I put that portion 863 01:18:08,490 --> 01:18:15,050 of our hearing away and inform you that we have upcoming meetings next Wednesday, 10, 7, 10, 864 01:18:15,390 --> 01:18:18,870 21 and 11, 4, 11, 4, 865 01:18:21,640 --> 01:18:24,180 and to that end, I did contain motion too. 866 01:18:25,200 --> 01:18:25,700 Sorry, sorry. 867 01:18:26,000 --> 01:18:26,480 Go ahead. 868 01:18:28,160 --> 01:18:31,900 So we don't need to make any other decisions here. 869 01:18:32,320 --> 01:18:33,920 No, I've got a push point, I don't believe. 870 01:18:34,360 --> 01:18:41,850 So just in recap, just because that's how my brain works, so we're going to ask the owners 871 01:18:41,850 --> 01:18:48,370 of the building to, I'm sorry, I'm sorry, I'm sorry, I'm sorry. 872 01:18:48,830 --> 01:18:55,130 Just to firm up dates as far as what their timeline is for the building, engineering, building 873 01:18:55,130 --> 01:18:57,590 permits, you'd like all that together. 874 01:18:58,430 --> 01:19:03,190 So I'm putting you back on the town manager to come up with a workable plan that we would 875 01:19:03,190 --> 01:19:04,030 be happy with. 876 01:19:04,270 --> 01:19:09,130 And to that end, we've done, we really, the purpose of this meeting was to give everybody 877 01:19:09,130 --> 01:19:19,710 who wanted to have input and it sounds like the idea is a hybrid of both and making sure 878 01:19:19,710 --> 01:19:26,130 that we have enough parking place for the building if they're investing in orange and 879 01:19:26,130 --> 01:19:33,490 they're really serious about it and then having some other parking places and whether it be 880 01:19:33,490 --> 01:19:40,570 if it's, you know, if we can get designs of a two story in that place or just a single story 881 01:19:40,570 --> 01:19:49,350 as Mary was talking about with food truck area, maybe electric charging stations perhaps, 882 01:19:49,530 --> 01:19:58,350 maybe some solar, maybe outlets for when they're, if we did a market or fair there, keeping 883 01:19:58,350 --> 01:20:00,810 that green space, so that's sort of a design. 884 01:20:00,810 --> 01:20:06,090 So it sounds like design things, we're just at the public hearing phase brainstorming phase. 885 01:20:06,490 --> 01:20:06,510 Right. 886 01:20:06,510 --> 01:20:07,250 And we've heard it. 887 01:20:07,310 --> 01:20:07,930 But yeah. 888 01:20:08,370 --> 01:20:14,750 But yeah, we need to find what we need to have the town manager has to know what the conceptual 889 01:20:14,750 --> 01:20:17,230 thought is, what we want to see in the design phase. 890 01:20:18,430 --> 01:20:20,750 So we're not going to ask them for all these different options. 891 01:20:20,930 --> 01:20:22,970 We're going to say, this is what we're kind of looking at. 892 01:20:23,470 --> 01:20:23,610 Right. 893 01:20:23,970 --> 01:20:24,550 That's my thought. 894 01:20:25,330 --> 01:20:27,770 Well, I'm a different thought on this. 895 01:20:27,770 --> 01:20:33,590 I believe that when I got, but I wanted out of this meeting, I got in that is that a course 896 01:20:33,590 --> 01:20:41,730 serious and we need to get met and them together to come up with a plan that would be 897 01:20:41,730 --> 01:20:47,850 amenable to both of us to pull this off as far as whether we do a splash pad or a double 898 01:20:48,350 --> 01:20:53,370 parking lot or anything like that is down the road. I just want to let everybody have a chance 899 01:20:53,370 --> 01:20:56,370 to talk to that end, to expand the money. 900 01:20:56,710 --> 01:21:00,150 Yeah, but that's the key as to make sure we spend as much as 901 01:21:00,150 --> 01:21:02,730 as much as money as we can for things that we need. 902 01:21:03,450 --> 01:21:08,170 And so I like that idea of trying to get whatever materials we would need 903 01:21:08,170 --> 01:21:12,070 to make it happen through the grant money. 904 01:21:13,170 --> 01:21:16,490 And just, and would we keep them on that site? 905 01:21:16,650 --> 01:21:20,550 Would we put the materials on that site or just buy them ahead of time 906 01:21:20,550 --> 01:21:23,150 and have it like they owe us that? 907 01:21:23,150 --> 01:21:25,530 like prepay for it and keep it on their site. 908 01:21:25,930 --> 01:21:28,630 Yeah, you have to take delivery to pick. 909 01:21:29,610 --> 01:21:30,370 That's municipal. 910 01:21:31,470 --> 01:21:33,710 So we could take delivery on site, 911 01:21:33,790 --> 01:21:36,390 maybe we could potentially take delivery in store it. 912 01:21:37,790 --> 01:21:40,850 But of course, if we spent the money for that site, 913 01:21:40,870 --> 01:21:43,070 we want to make sure it goes to that site too. 914 01:21:43,870 --> 01:21:45,310 So I think it's slippery slope. 915 01:21:46,930 --> 01:21:48,810 And if it's a matter of bringing in some fill, 916 01:21:49,070 --> 01:21:50,990 then I can talk to Tim about that. 917 01:21:50,990 --> 01:21:54,850 and bring in potentially some wall material. 918 01:21:56,010 --> 01:21:57,890 And maybe even if we get wall material, 919 01:22:00,310 --> 01:22:05,150 store it on site, maybe we can work out something with a local company that's willing to donate some time, 920 01:22:05,410 --> 01:22:08,990 or potentially leverage the highway crew to do some work too. 921 01:22:09,830 --> 01:22:14,630 Where we get heard on these projects is paying prevailing wage. 922 01:22:15,370 --> 01:22:20,050 So, when you have to pay prevailing wage for horizontal or vertical construction, 923 01:22:20,050 --> 01:22:27,030 pay top dollar based on wages determined through negotiations between the unions and Boston and the governor 924 01:22:27,030 --> 01:22:29,970 essentially so you pay a lot of money to get a profit. 925 01:22:30,000 --> 01:22:59,180 So we could procure material ahead of time with the money we have and then do additional procurement on the road if needed. So again, it would be all in the spirit to try to use the capital we do have to turn into tangible use. We don't have, it's unlikely that we have enough money to fully do any of these design concepts as is. 926 01:22:59,180 --> 01:23:06,840 because the cost of building that parking lot design with the splash pad is certainly a 927 01:23:06,840 --> 01:23:13,540 one to $2 million project. The cost of this landscape design, if we went on and bid this job 928 01:23:13,540 --> 01:23:18,600 as is, and you had to couple in any type of environmental abatement work at the same time, 929 01:23:18,720 --> 01:23:25,440 as well as putting in for your full wetlands delineation design, getting through the conservation 930 01:23:25,440 --> 01:23:30,900 commission process and then actually procuring material and building all this. This is probably 931 01:23:30,900 --> 01:23:36,680 a six to eight hundred thousand dollar project right here. You've got two to three hundred. So 932 01:23:36,680 --> 01:23:57,310 I just don't see it happening unless you, yeah, I just don't see it. It's the time that I'm 933 01:23:59,910 --> 01:24:02,190 Not 300, but let's be clear. 934 01:24:03,470 --> 01:24:06,230 Long times, like, Matt's right. 935 01:24:06,470 --> 01:24:09,110 We got to have a grants to get the concept 936 01:24:09,110 --> 01:24:11,770 that is designed and approved. 937 01:24:12,590 --> 01:24:15,050 Okay, but it can be done, it's in steps. 938 01:24:16,470 --> 01:24:18,610 And so as Kelly summarized, hybrid. 939 01:24:19,470 --> 01:24:20,550 Okay, green space. 940 01:24:21,150 --> 01:24:23,490 We really get to be clear on how we obeyed 941 01:24:23,490 --> 01:24:26,250 because I think we have two very different 942 01:24:26,250 --> 01:24:31,130 thought process on that with very different implications, but we won't go into that tonight. 943 01:24:32,650 --> 01:24:37,690 And skin in the game is more than building, get a building permit and tell us your timeline. 944 01:24:38,130 --> 01:24:40,910 We've been down that road with three other owners. 945 01:24:41,730 --> 01:24:48,010 My, if it was my property, I'd say, up, give us that, and put $100,000 in an outscrope. 946 01:24:48,450 --> 01:24:53,270 Okay, if you can't put $100,000 in, do it in four payments over the next two years. 947 01:24:53,270 --> 01:25:06,470 Okay, if you can't do that, if you sell the property, we put a lean on the buildings and we get a hundred grand out of that because a building permit in a timeline and my opinion doesn't cut it, we've been down this road. 948 01:25:06,970 --> 01:25:10,590 So Lisa's comments about this is all the owners need to do. 949 01:25:10,910 --> 01:25:19,030 I would say no, we need cash on the barrel head somehow to say this is a real deal. Thank you. 950 01:25:19,390 --> 01:25:21,330 And we want them here. We do want them here. 951 01:25:21,330 --> 01:25:23,050 We want them to know that we want them here. 952 01:25:23,430 --> 01:25:25,870 Absolutely, we want them here and we'll do the parking. 953 01:25:26,230 --> 01:25:27,870 We want them, we're excited, right? 954 01:25:27,990 --> 01:25:30,590 We're very happy to have them come, 955 01:25:30,770 --> 01:25:33,310 but we just need to see more. 956 01:25:34,690 --> 01:25:34,710 Yeah. 957 01:25:35,330 --> 01:25:39,290 So to that end, I would entertain motion to adjourn the meeting. 958 01:25:39,830 --> 01:25:40,990 It's 655. 959 01:25:41,430 --> 01:25:41,850 So moved. 960 01:25:42,010 --> 01:25:43,130 Second that. 961 01:25:43,870 --> 01:25:44,710 All those in favor? 962 01:25:45,510 --> 01:25:45,810 Hi. 963 01:25:47,030 --> 01:25:47,890 Thank you, everybody. 964 01:25:48,050 --> 01:25:48,450 Thank you.