[0:00] Sewer Authority board of directors [0:01] meeting this Thursday September 12th [0:05] 2024 we have six [0:07] announcements first is a question uh [0:10] does any board member know of a conflict [0:12] of interest or potential conflict of [0:14] interest with respect to any item on the [0:16] agenda [0:18] tonight looks like the answer is [0:20] no um the next announcement is welcoming [0:23] our new board member Michael Hughes um [0:25] Michael is an Orange County appointee [0:27] and took his oath of office on July 3D [0:30] welcome Michael thank you it's good to [0:33] have you here um and on June 17th the [0:36] chapel Hilltown Council reappointed Todd [0:39] to the aasa board of directors for his [0:41] second three-year [0:44] term nice job [0:47] Todd and we have uh two meeting [0:51] updates the first is that over the [0:53] summer aasa hosted two Community Chats [0:56] on the topic of pest on June 27th the [0:59] community chat focused on paying for p [1:01] mitigation which was held at the Chapo [1:04] public library and on July 30th another [1:07] chat was held at lza Cafe in carboro [1:10] both events were well attended with [1:12] about 20 to 25 members of the public at [1:14] each and fostered informed and engaged [1:17] discussion staff are working on plans [1:19] for two additional Community chats this [1:21] fall and then in August aasa hosted a [1:25] briefing on aasa's P action plan for [1:28] state senator Greg Meer state [1:30] representatives Alan boy Renee price and [1:33] a representative from US Representative [1:36] Valerie fi's office um in addition we [1:39] had a really good showing from local [1:40] elected officials local government staff [1:42] and the Press uh staff and our [1:45] consultant walked attendees through the [1:47] details and challenges of dealing with [1:49] pasas including a really well attended [1:51] tour of the pasas treatment pilot [1:54] project at the water treatment plan we [1:56] had an enlightening conversation about [1:58] ideas for pursuing federal and state [1:59] funding and staff for following up on [2:02] some of the leads that they provided [2:04] would anybody else like to provide any [2:06] additional Reflections or takeaways on [2:07] the [2:10] briefing okay and now this is an [2:14] exciting announcement um Monica Dodson [2:17] has been named aasa's new Deputy [2:18] executive director and Todd Taylor will [2:21] provide the [2:26] introduction yes it's my distinct [2:28] pleasure to interv Monica doson as our [2:32] new Deputy executive director um we had [2:36] a very competitive Nationwide search for [2:39] this position and uh got to interview a [2:42] lot of interesting candidates but uh [2:45] Monica bested them all as our homegrown [2:49] uh candidate here and uh you know her 20 [2:53] years of experience here at aasa leading [2:56] both our water resources and waste [2:59] management teams are going to serve her [3:01] very well uh in this position not to [3:05] mention her leadership style her [3:08] commitment to continuous Improvement and [3:10] her unwavering support for the aasa [3:13] staff will all pay dividends to us uh [3:16] down the road as she uh transitions into [3:19] this new role so please join me and [3:22] congratulating Monica on this promotion [3:24] and we very much look forward to working [3:26] with her [3:31] [Applause] [3:33] thank y'all um I've had a very exciting [3:35] career at AA so far um and I'm honored [3:39] to be able to uh continue to serve this [3:41] community can serve um the organization [3:44] and our employees you know when I [3:46] started a Wasa 20 years ago I was a [3:48] young woman less than a year out of [3:50] college and still very much trying to [3:52] figure out what I wanted to do what my [3:54] place was and so I feel very blessed to [3:57] have found a Wasa um I learned early on [4:00] that this was a place where I knew I [4:01] could learn and grow and one where I [4:03] could have a positive impact not only on [4:04] the organization and the community but [4:06] also the employees um aasa is full of [4:09] talented hardworking dedicated employees [4:12] and um they are certainly a source of [4:15] motivation and inspiration for me and so [4:17] I'm excited to continue to support them [4:19] um to advance the organization and [4:22] ensure our community our our our success [4:25] um within the community especially with [4:26] all the important work that we have [4:28] ahead of us so o want to say thank you [4:30] all um if it wasn't for your support we [4:32] wouldn't be able to do what we do so [4:34] thank [4:34] you thank you [4:39] very thank you Monica we're looking [4:42] forward to working with you in your new [4:43] role um and now our final announcement [4:47] uh Mo Rashid PE has been named aa's new [4:50] utilities engineer and Alison Spinelli [4:52] will provide an [4:56] introduction thank you I'm excited to [4:58] introduce MO mois rased he prefers to go [5:01] by Mo so Mo has nine years in the water [5:04] and wastewater industry he has a [5:06] background in both uh variety of [5:08] Consulting as well as technology vendors [5:11] most recently um Mo comes to us from a [5:14] consulting firm called with's Ravenel um [5:17] where he was doing a lot of facility [5:19] type projects um he has a bachelor's [5:21] degree from NC State and is a licensed [5:24] PE here in North Carolina uh interesting [5:27] enough he is a native of Chapel Hill so [5:29] it's kind of fun to bring somebody back [5:31] into the fold here with us um Mo joined [5:34] us at the beginning of August and it's [5:36] been a really great and seam list from [5:39] that point on and so we're really [5:40] excited that Mo's here and joins the [5:42] Capital Improvements team and just want [5:44] to welcome Mo as part of our our new [5:46] engineering team as one of our newest [5:48] utility Engineers [5:56] Mo thank you for that very generous [5:58] introduction um yeah I'm excited to be [6:00] here I look forward to serving the [6:02] community and my dad is already asking [6:03] me a whole bunch of questions [6:06] about but thank [6:13] you thank you we're looking forward to [6:15] working with you too and my parents also [6:17] ask me a lot of [6:19] questions um are there any other [6:21] announcements by board [6:23] members are there any other [6:24] announcements by staff [6:28] no um we're moving on to petitions and [6:31] requests are there any petitions and [6:32] requests from the [6:36] public um are there any petitions and [6:38] requests from board members I know of [6:40] two Bruce and myself are there any [6:43] more okay start with [6:46] Bruce okay I have a [6:50] um proposal that I'd like the board to [6:54] uh consider uh uh discussing uh [6:58] regarding how the uh budget alternatives [7:03] are presented to us uh each year when we [7:06] go through the budget cycle um and I [7:09] bring it up uh now so that we can [7:13] discuss uh if this is something we want [7:15] to take seriously and perhaps at the [7:17] next board meeting we can go into some [7:19] details on on uh uh what the proposal [7:23] should should look like unless board [7:25] members want to just um discuss it now [7:27] and make a decision at this point [7:30] um the um typically what happens is in [7:35] December uh we start the budget cycle at [7:38] least as far as the board is concerned [7:40] and Stephen presents uh What uh the [7:43] schedule will look like and what we'll [7:45] be doing at each each board meeting uh [7:48] and then in the spring we get uh [7:51] typically a a uh base proposal and then [7:54] one or two [7:56] Alternatives uh uh that uh would allow [8:00] for lower uh rates um [8:03] and those uh alternatives are pretty [8:07] detailed in terms of the cost savings [8:10] but my frustration has been that they're [8:13] not detailed at all in terms of the [8:15] additional risk that we're taking on by [8:17] pushing projects out or not doing [8:20] projects uh um and [8:24] um uh so what I would like to do is uh [8:28] see if the Bo is in uh agreement at [8:32] least in part uh with respect to that [8:35] frustration and if so uh requests that [8:39] uh management produce board altern or [8:42] budget Alternatives uh that include some [8:45] assessment in a quantitative sense of [8:48] what the the risks are that we're taking [8:49] on in those Alternatives uh I understand [8:53] that it will probably take a couple of [8:56] Cycles to get to that point uh uh um [9:01] because we will be asking management to [9:05] to uh um project out unknowns and and [9:10] and try to quantify some some unknowns [9:12] but I think we can get there and and [9:14] there will be some uh projects where [9:16] we'll just have to say we we we don't [9:18] know what it is it's it's just too too [9:20] unclear um I I brought this up uh just [9:26] before this this topic up just before [9:29] the [9:30] pandemic uh we did a little bit of work [9:32] on it Stephen in particular did did work [9:35] on it pandemic came and we made a [9:37] decision to keep rates fixed for a [9:39] couple of years uh so that essentially [9:42] forced our hand in terms of what the [9:44] Alternatives would be and uh never [9:46] really restarted it but I think it's it [9:48] it would I think it's an important [9:50] Initiative for us to look at seriously [9:53] um so anyway uh i' be curious to hear if [9:58] other folks share that [10:00] frustration uh and if so uh if if we [10:03] should move forward with a discussion on [10:06] what uh uh what a proposal would look [10:12] like uh yes I think it would be nice if [10:16] we have that proposal in in that or that [10:20] presentation in that manner because that [10:23] way it will be easier for us to assess [10:26] and make a decision at the end so I [10:29] think it's a it's to toward the benefit [10:32] of the board and Wasa [10:38] so would anybody else like to [10:43] weigh I have a question for Stephen oh [10:46] go ahead somebody over sure I'll say an [10:49] additional benefit is that it would help [10:52] um provides communicative value to the [10:55] elected officials and and the general [10:57] public um as well just like it does for [11:03] us I mean it seems totally reasonable to [11:06] me I my question for Stephen is is that [11:08] feasible is there anything that you [11:11] would need is that something that you [11:12] can work [11:14] in um so the last time we tried this [11:19] this may have been [11:21] staff's picking the wrong thing to start [11:23] with we tried with in the operations [11:26] department so we looked at the [11:28] collection system and were trying to say [11:30] trying to determine well if we spend [11:32] money doing these things or don't spend [11:34] money doing these things you know how [11:35] will that impact the performance of the [11:37] collection system and it was not a very [11:40] satisfying uh exercise for us and I [11:43] don't think for the board either um but [11:46] when I uh Bruce gave us a little bit of [11:49] heads up that he was going to bring this [11:50] up tonight when I read your comment in [11:51] your email for some reason hit me [11:54] differently and um if we were to if you [11:57] intended and and I would advocate this [12:00] to focus on CIP projects as opposed to [12:03] the operating group I think we could [12:05] come closer to uh to something like that [12:08] and as you know we've we've we've done [12:10] that kind of at a not a very detailed [12:13] level the last couple of budgets um I'm [12:17] a little uh heartened by the fact you [12:19] say it's going to take more than one [12:20] budget cycle uh Todd and I were talking [12:23] a little bit briefly this afternoon and [12:25] our asset management [12:27] program uh is is making some Headway but [12:30] it's a long-term project that's going to [12:32] take [12:33] another two years give mind plus or [12:37] minus a year um and I think that it will [12:40] be able to to help us answer those types [12:42] of questions not only um you know if we [12:46] don't do this project kind of what are [12:48] the what are the risk associated to but [12:50] what what will we have to spend in [12:52] maintenance as because we didn't fix it [12:54] and that sort of thing so um I think we [12:56] could make some to answer your question [12:59] M I think we can make some steps um this [13:02] year and and hopefully bigger steps as [13:04] we as we go [13:07] along with [13:09] you I I think on the CIP projects [13:13] projects I think that's basically where [13:16] I'm um I like to have more info on that [13:20] so and and as we talked before um we C [13:25] staff certainly feels we have more [13:26] flexibility in the CIP program as a as [13:29] opposed to the you know the operating [13:34] expenses I I think it's a good idea for [13:36] us to as a board to understand the [13:40] budget all of it not just the CIP but [13:43] the operating Basics well yeah [13:46] discussion we have at least a session [13:48] that we had talked about a little bit [13:50] before of having a session so that [13:52] everybody gets on the same page and [13:55] understand where we are and why we are [13:57] where we are would be helpful [14:00] just to bring the new people up and the [14:02] old people to where we are and why we [14:05] are where we are especially since there [14:08] were things or I would say um [14:12] circumstances that got us here from [14:13] previous board [14:15] activity or board decisions that pushed [14:18] us [14:19] to this outrageous percentage Inc that's [14:24] my opinion and I've been is that [14:26] different than what Bruce is suggesting [14:27] are you suggesting no it's not I'm I'm [14:30] supporting what he's saying okay but are [14:31] you asking for something additional as [14:32] well just want to be all inclusive okay [14:36] yeah and and my my only point is [14:40] um the risk assessment will be um I [14:45] think more meaningful on the CIP side [14:46] but I I take your point Didn't mean to [14:49] apply we wouldn't we would just ignore [14:51] that [14:54] part anybody else have a does that seem [14:57] good with that sounds reasonable I mean [15:00] I I agree also that long term we should [15:04] cover operations as well and and I I do [15:07] see a a path to getting to operations [15:10] but uh walk before we run yeah um so [15:14] does it make sense then for [15:16] maybe uh Stephen and I or Steph and I [15:19] and Todd I'm not sure who the group [15:21] would be to get together and and put [15:23] together a proposal we can talk about at [15:25] the next board meeting is that [15:28] reasonable yeah that seems okay that [15:31] seem to with you time yeah I think [15:33] that's fine I just want to make sure [15:35] we're getting it the expectations set [15:38] out so that we don't go off and come [15:41] back again with no I think it should be [15:43] very narrowly scoped initially just so [15:45] that we can respond I think as I Echo [15:47] Steven's comments if we can focus on the [15:49] CIP that makes sense maybe we you know [15:52] we can discuss this maybe we even focus [15:54] on a part of our overall C like we're [15:58] focusing on the distribution system or [16:00] something like that maybe run that out [16:02] kind of see if are we getting before we [16:04] do a whole lot of work and then yeah [16:06] that makes complete tense just to kind [16:08] of scope it so I think our Our intention [16:11] would be that next meeting is kind of a [16:12] conversation I think it's great that [16:14] maybe we could get together kind of come [16:17] up with a framework and then maybe [16:20] discuss it see if we're hitting all the [16:22] points of the next me that works okay [16:25] cool you good with that yeah great all [16:27] right um and then I also have a um [16:30] request and this is to the board um for [16:33] whether this is something we're [16:34] interested in having aasa look into or [16:38] investigate for its impacts to aasa um [16:41] and so I'm just going to read from [16:43] something that Kirk Ross who's a local [16:44] journalist wrote uh earlier today um so [16:48] on July 31st UNCC Chapel Hill filed for [16:50] a permit modification for its Cameron [16:52] Avenue co- generation plan that would [16:55] allow it to um conduct a year-long test [16:57] of replacing coal with pellets made from [16:59] a mix of wood paper and plastic scraps [17:02] if successful the change to the new fuel [17:05] conversion would become permanent and [17:06] the vendor making pellets would likely [17:08] build a facility to gather and process [17:11] manufacturing scraps to supply it likely [17:13] by rail um testing provided by the [17:16] vendor said that the percentage of [17:17] plastic in the pellets runs from 15 to [17:19] 40% an additional appendix included with [17:22] the application shows that the pellets [17:24] also include varying amounts of P [17:27] compounds um so far um the North [17:30] Carolina Department of Environmental [17:31] Quality shows that a public hearing and [17:33] public comment period has has not been [17:35] scheduled aside from a UNCC press [17:38] release two weeks after the permit [17:40] modification uh public discussion has [17:42] been minimal um there are lots of [17:45] reasons to discuss this and the reason [17:47] that I think that our board would be [17:49] interested in this um is that um there [17:53] is both [17:56] um um most studies that they have shown [17:59] and that were in this report that they [18:01] released looked at groundwater and [18:03] waterways um but there's also the issue [18:06] of potential um contamination of Wells [18:09] crops and lakes downwind of the plant [18:11] and our water source University Lake um [18:13] could potentially be affected by these [18:15] plastic pellets being burned at the [18:17] co-generation plan um and [18:20] so um the university says that it will [18:23] monitor the pasas to make sure that [18:25] levels are acceptable um but experience [18:28] tells that they should also have to [18:30] monitor emissions which they have not [18:31] said that they would do yet um and so [18:35] this would be introducing pasas into a [18:37] process that would be being burned at a [18:40] downtown facility um surrounded with by [18:43] schools hospitals and our nearby local [18:45] water supply so it does seem like [18:47] something that we as a board should be [18:49] aware of and potentially ask aasa to [18:52] investigate so um when I first read [18:55] about this it was uh buried on the UNCC [18:57] website um and journalists brought this [19:00] to the attention of the public and so [19:02] this is more of a conversation for the [19:04] board on whether we are interested in [19:06] having a Wasa look at this or to ask for [19:09] more information from UNCC so that we [19:11] can be better informed about the test [19:13] that UNCC plans to [19:19] conduct go [19:21] ahead the question I have is about the [19:23] remediation or the cost of cleaning up [19:27] the psp4 when it hits to water is there [19:30] a cost attached to the contaminant [19:34] Organization no there's no process not [19:37] not in the report that has been released [19:39] so far so being part of the discussion [19:41] that we had with the legislators and [19:43] people like that would lend one to think [19:46] that going forward there might be a [19:49] process where you can actually have the [19:50] people that are contaminating the water [19:52] pay for it's clean up at some point yeah [19:55] that that is not on the UNCC website and [19:57] that has that topic is not included [20:02] not so my question is who will oversee [20:06] besides [20:07] UNC as far as how much pasas is been [20:13] released because I know if UNCC has [20:16] interest in it who else would be [20:21] overseeing you do we know I we don't [20:24] know but that is something that we could [20:25] ask aasa to have a conversation with UNC [20:29] we could ask aasa if there's going to be [20:30] a public hearing on this topic um this [20:33] is this is a board discussion is this [20:35] topic like something that we are [20:36] interested in asking aasa to investigate [20:39] further so that we as a board can learn [20:40] more about this planned um pilot study [20:45] and what it might do to our [20:48] community Kim yes I think so [20:53] um I'm shocked that anybody's even [20:55] talking about burning Plastics at any [20:57] level anywhere [20:59] yeah and [21:02] um yeah it should be investigated okay [21:06] other people I I think the dialogue [21:09] would be useful um I think to answer [21:12] your question this is DQ that manages [21:16] this whole thing oh yeah my [21:17] understanding is Department of [21:18] Environmental Policy yeah and my [21:20] understanding is that the [21:22] um uh they're also the ones that like [21:25] manage public hearings associated with [21:27] that so [21:29] um but this is in theory to increase you [21:32] know air quality so I think it's good to [21:35] have the dialogue yeah would anybody [21:38] else like to I mean I I think that it [21:40] would be useful to have the dialogue and [21:41] for aasa to enter this conversation um [21:44] because um just from doing you know the [21:47] reading and talking to reporters who [21:48] have been looking into this um my fear [21:51] is that it would affect University [21:55] lake so I I I agree with the dialogue I [21:58] would like to add dialogue with a [22:00] purpose yeah what is the expectation [22:03] from this [22:04] dialogue yeah [22:08] um my thought would be that uh we would [22:11] reach staff reach out to UNC just to [22:15] learn more about potential impacts to [22:18] aasa as far as the water and wastewater [22:21] are concerned and then report back to [22:24] the board on what we have learned and [22:28] that be the first step and then we can [22:31] take take it from there as to how we [22:34] want to proceed once we know a little [22:36] bit more this is kind of hot off the [22:38] presses we we haven't had a lot of time [22:41] to talk to anyone about it or plans are [22:45] so I would say give us if if the board's [22:48] interested refer it to staff give us the [22:50] opportunity and we'll report back on on [22:53] what we find it is there [22:56] um an an industry in existence now that [22:59] does this are there um it's small and [23:02] it's in um very specific places in the [23:05] United States as far as I'm aware [23:06] they're not usually in population [23:08] centers the way that our Coen plant is [23:09] on in the middle of a neighborhood [23:13] okay um my reason for asking was uh less [23:17] about sort of the sighting but more um [23:20] are there other places where we can get [23:21] information on what the emissions are so [23:23] if the inity already exists we the [23:26] University of Missouri is doing this [23:28] okay so may may make sense also Todd to [23:31] do at least a little bit of research and [23:33] see if we can get some information from [23:35] ex you know existing [23:37] operators that's a good point yeah did [23:40] the excuse me did the article say if [23:42] this is in Li of switching to natural [23:44] gas because for a time they were going [23:45] to switch to natural gas it seems like [23:48] this is the pilot that is going forward [23:50] this mixture of wood plastic and paper [23:52] they can't switch entirely to natural [23:54] gas because you'd actually have to crank [23:56] up the size of the pipeline okay [23:59] Mill did they give any indication on the [24:01] percentages of each of those components [24:03] they did and there's a really detailed [24:04] report that I can send everybody and you [24:07] know if you're interested in this I [24:08] don't know off the top of my head but [24:10] yes there is a percentage of each one [24:11] yeah that'd be great if we could have [24:13] yeah I'm happy to share that and uh with [24:15] respect to Bruce's comment about [24:17] emissions I'd be surprised if there [24:20] weren't data on emissions and my [24:22] goodness I can't imagine getting that [24:25] permitted without an understanding what [24:27] the permissions are [24:29] yeah I mean they they they do have [24:31] everything listed out are are the [24:33] concern of the reporters is that it's [24:34] been disaggregated and the way that they [24:36] burn these products is not [24:38] disaggregated so so um I think getting [24:42] more information is a really good first [24:44] step and I appreciate staff looking into [24:50] this does anybody else want to say [24:52] anything on that topic mam chair for as [24:55] a matter of History the University [25:00] uh [25:02] emissions have ended up on top of within [25:07] the resources of and [25:11] um without question have adversely [25:14] impacted the community during all the [25:17] years since I've been in Chapel Hill [25:18] since [25:19] 1963 you know if the things that PO to [25:23] mind immediately are the collash under [25:26] what used to be the police station still [25:28] is but um it's it's always been amazing [25:32] to me that conversation about that [25:34] collash has not included the University [25:37] where it came from agree if you go to [25:40] the other end of the pipe to the steam [25:42] generating plant that has deposited Ash [25:46] on the houses of the people who lived [25:49] around that plant ever since I've been [25:51] in the community and long before [25:54] that uh I can't imagine [25:59] that the university would even apply for [26:02] such a permit without a widespread [26:05] Community conversation about this [26:08] because what it does is that Coen [26:11] plan has impacted the community in an [26:15] adverse way for so many years promises [26:18] have been made over and over again and [26:20] broken over and over again by the [26:23] university to switch to fuel sources [26:26] that were less harmful to the community [26:29] uh and it's it's astonishing to [26:32] me that [26:35] uh the community would have [26:37] learned about this [26:40] proposal only by reason of the diligence [26:44] of reporters who don't have a newspaper [26:45] to write anything in the traditional [26:49] sense the process for getting the [26:53] permit uh is managed by [26:56] DEQ under rules that are in place those [27:00] rules permit the public to request [27:03] public [27:04] hearings before the permit is issue and [27:07] I would think at the very least [27:10] University ought to be advised that the [27:14] community community is going to insist [27:16] on uh public [27:18] hearings where information can be [27:20] developed analyzed considered and where [27:23] the community can come to a consensus [27:26] about whether or not you want another [27:28] impact like the CO as impact or like the [27:31] impact of the Coen plant for all the [27:34] years uh I see my friend braxon sitting [27:38] here braxon uh fushi has led a community [27:42] effort for many years to try to get [27:45] folks who lived around that plant for so [27:47] many years relief from what the [27:49] University was doing to them we're in a [27:52] different era now yeah but we're [27:55] still I mean I can't imagine that there [27:58] that they're considering doing this [28:00] without a fullsome community involvement [28:03] so that's my herang about it me for [28:06] jumping in but I think please don't [28:08] apologize I appreciate the historical [28:10] context and I agree with you I mean I I [28:13] think that this is something that as far [28:15] as I'm aware it has not come up before a [28:18] public board prior to tonight and um I [28:22] would encourage the people here to both [28:24] contact the two town councils and see [28:27] what we can do to um encourage the [28:30] university to have a very full community [28:32] conversation about [28:34] this and now you said you'd be sending [28:37] us that article yeah I'm happy to send [28:38] you the three articles that have been [28:40] written by journalists as well as the [28:42] report that UNCC has put out um and I [28:45] will send that to you as [28:46] well um okay does anybody else want to [28:49] say anything on that topic and thank you [28:51] for taking the time on that I appreciate [28:52] it I do have a question who issues the [28:56] uh permit the town of [28:58] no the DQ the the Department of [29:01] Environmental environment quality yeah [29:04] so it's it's a state level [29:06] decision so um just wanted to make [29:09] people aware and um happy to work with [29:12] you on next steps um we will now move on [29:16] to the consent agenda there it's a [29:17] really really big consent agenda so bear [29:19] with me and let me know if you'd like to [29:22] pull something from the consent agenda [29:24] there's 13 items um I'll just read all [29:27] of them and if you want to pull it tell [29:29] me um afterwards uh one is a report for [29:33] material procurement for the Clark Lake [29:35] Road water main replacement project two [29:38] is a report for chemical procurement for [29:40] water and wastewater treatment [29:42] processes three is an annual report on [29:45] disposal of surplus personal property [29:48] four is um the update from the diversity [29:52] Equity inclusion and belonging program [29:54] and equal employment opportunity for [29:56] fiscal year 2024 [29:59] five is the Capital Improvements program [30:01] semi annual [30:02] report six is the pre preliminary [30:05] financial report for the 12-month period [30:07] ending uh June 30th [30:10] 2024 seven is the quarterly report on [30:12] attendance at board meetings eight is [30:15] the fiscal year 2024 budget [30:17] amendment nine is the review proposed [30:20] work plan for aasa's executive [30:23] director 10 is the resolution accepting [30:26] lead and copper rule revision [30:28] funding 11 is the resolution accepting [30:31] an increase in state revolving Loan Fund [30:34] for the West Cameron water main project [30:37] 12 are the minutes of the June 13 2024 [30:40] meeting of the board of directors and 13 [30:43] are the minutes of the June 13 2024 Clos [30:46] session of the board of directors are [30:48] there any public comments on any of [30:49] these [30:50] items okay um are there any questions [30:53] comments or would a board member like to [30:55] pull an item from the consent agenda [30:59] number four number four number four is [31:01] the diversity Equity inclusion and [31:03] belonging program update and equal [31:05] employment opportunity for fiscal year [31:07] 2024 would anybody else like to pull [31:10] number five number five from Michael [31:13] that is the Capital Improvements program [31:14] semiannual report um anybody else should [31:19] we um have a motion for the remaining [31:21] items and then we can pull those opers [31:24] so I have a couple of questions and [31:27] comments comments that [31:29] are uh that don't rise to the level of [31:33] pulling the items which items do you [31:36] want to question or [31:38] comment um and [31:40] I item two I have a comment [31:44] on uh that one is going to be [31:47] pulled um why don't we pull them so we [31:50] can um motion the rest and then we can [31:54] okay okay and what are the other ones uh [31:57] this one is the no that one's already [32:00] been pulled uh that one's been [32:04] pulled uh [32:06] the financial six month Financial I have [32:10] a question on what number is that [32:16] um is it the preliminary six okay okay [32:20] and then this one is number nine number [32:26] nine okay so here's what I'd like to do [32:29] I'd like to make um a motion in a second [32:32] to approve [32:35] 1378 10 11 12 and [32:38] 13 and then I would like to pull 2 4 [32:43] five six and [32:45] nine for discussion did I do that [32:48] correctly uh it would be more [32:49] appropriate for another uh member to [32:53] make the motion okay and a second from a [32:55] board member okay then I will just date [32:58] them and I will ask for a motion thank [33:00] you may I please have a motion all right [33:04] Todd makes the motion may have Myra [33:07] second all right um all those in favor [33:10] say I for the list that I [33:13] just I okay those opposed say [33:17] nay okay great the motion passes for the [33:21] items that I just outlined let's do [33:24] these in numerical order to make it easy [33:26] so we're going to start with two which [33:28] is the report for chemical procurement [33:30] for water and wastewater treatment [33:32] processes and Bruce has a question okay [33:35] it should be pretty simple um the uh [33:39] aluminum sulfate is this a [33:41] commodity is that a commodity [33:45] chemical I want [33:49] to I'm Kelly safield Director of Finance [33:52] Monica [34:00] I'm uh Monica doson Deputy executive [34:03] director I'm not sure what you mean by [34:04] commodity um okay here's my my concern [34:07] there's a pretty wide range of prices [34:10] here and you normally wouldn't expect [34:13] that for a commodity they'd be really [34:15] tightly um grouped together um which [34:18] leads me to [34:20] believe uh is something funny going on [34:23] like for example the product we'll get [34:27] from [34:28] usco is not of the same quality as the [34:31] others it just looks funny those numbers [34:34] so the the winning bid was actually the [34:36] current product we've been using um for [34:39] several years so certainly don't have [34:40] any concerns with um with the quality of [34:43] it maybe it's because we had an existing [34:47] relationship and yeah that's fine that [34:49] answers it okay that's [34:52] fine just recognize a lot of these [34:54] chemicals that we use are specific that [34:57] you can put it into water drinking water [35:00] so they are not like you know you just [35:03] couldn't go buy a raw aluminum sulfate [35:05] somewhere it actually had you know okay [35:08] standards there that other things aren't [35:10] in it okay that could contaminate the [35:12] water so okay but presumably that the [35:15] chemical from all four of these [35:17] suppliers are those requirement um but [35:22] if if it's working for us and it's the [35:24] same stuff then that answers the [35:26] question okay question on process would [35:28] it be appropriate to list that fact like [35:33] this is a current supplier in the future [35:36] I think that would be useful think so [35:44] that yeah all right let's move on to [35:47] number four which is the diversity [35:49] Equity inclusion and belonging program [35:51] update an equal employment opportunity [35:53] for fiscal year 2024 Al my okay [36:05] a couple of questions here with regard [36:07] to when did the position become vacant [36:10] exactly because you said you're in the [36:12] process of um you filling it October [36:16] November yes that was in July I believe [36:19] okay so what's the process I mean I read [36:22] what you said you were doing did you [36:24] have an exit interview with the person [36:25] that left we did [36:28] and other than he left for more money is [36:30] that that's the story at a higher level [36:32] position yes a higher level position [36:34] then our position is titled diversity [36:37] equ Equity inclusion and belonging [36:39] Specialists and he took a director level [36:42] position so what what kind of of um [36:46] promotional opportunities there are none [36:48] for existing positions since this was [36:51] the first time you had a had a DB person [36:55] and so there's no growth within that [36:57] road as far as promotions or counter [36:59] offers or anything like that um [37:01] specifically the person if they're [37:03] interested in the Director of Human [37:04] Resources position that would be an [37:06] Avenue for them um to to be promoted oh [37:12] I mean I'm just mean in in position in [37:14] title there's no growth opportunity [37:16] within a position if a person if you [37:19] wanted to keep a person that was already [37:21] here without giving them somebody else's [37:24] title you don't have any professional [37:26] development built and that's not just [37:28] for that position but for any position [37:30] for growth we do have professional [37:33] development opportunities with entitle [37:36] yes but that wasn't for this for the de [37:39] position well I would say that every [37:41] position has professional development [37:43] opportunities the person that we're [37:45] speaking of um took a the E Cornell [37:48] diversity Equity inclusion certification [37:51] program while they were [37:52] here I think specifically El Mar you're [37:56] talking about is there like a one two or [37:58] three or a an opportunity for that well [38:01] you counter offer people to keep them if [38:04] they're doing a good job sure without [38:07] without them having to leave to go get [38:09] something else I I know the E Cornell [38:11] stuff well yeah unfortunately we we we [38:14] don't have that for this much for this [38:16] position as far as you know TI other [38:20] titles or things like that we can offer [38:22] so what about can you explain the [38:25] belonging portion of your de I and [38:28] what's actually happening here with the [38:30] B part sure um we just want to cultivate [38:34] um a sense of fulfillment for people a [38:37] sense of um being included and being [38:40] engaged being um invited to um [38:45] participate in things that maybe are not [38:47] on their job descriptions whether it's [38:49] serving on one of our committees on [38:52] interview panels attending training and [38:55] things that um would be out there for [38:59] them that maybe are not specific to [39:00] their role so if they're say a treatment [39:02] plan operator it may not have anything [39:05] treating water but they would be able to [39:07] uh to gain experience now for employees [39:10] we are we have a program um it's a bonus [39:14] pay program for additional [39:16] certifications that are above what's [39:18] required for your position and sometimes [39:21] they very much align with the job [39:23] description and sometimes they're um I [39:26] would say valid or or accurate for [39:29] another position or maybe other skills [39:32] project management that sort of thing so [39:35] for the current opening that you have [39:37] for the deib person and you're going to [39:40] hire in October November so you have [39:42] candidates that you're bringing in now [39:44] absolutely we uh got a great response to [39:47] our recruitment we're currently um [39:50] screening we're doing telephone [39:52] interviews with 15 individuals and are [39:55] going to narrow that down [39:58] um and do inperson panel interviews [40:02] those are scheduled for the first week [40:03] of October okay it may bleed into the [40:06] second week of October [40:09] too one other question what may one [40:11] other question that I have with regard [40:14] to the the chart that's on page nine [40:16] that list the note at the bottom says [40:19] you know decline people declined the [40:22] offer or you failed the post offer [40:24] process what's the post offer process um [40:26] so all of our positions require a [40:29] physical as well as a drug screen as [40:31] well as background [40:35] checks verifying their education that [40:37] they put on their resume that sort of [40:39] thing oh [40:41] okay and back background checks I'm just [40:44] interested what would keep a person from [40:45] getting a job here if they fail a drug [40:48] screen if they um say they got a degree [40:52] somewhere and they [40:55] didn't it doesen it does [40:59] okay I I was just interested in in [41:01] knowing what that was have you ever had [41:03] a board member participate in any of the [41:05] interview [41:07] processes I don't think that's ever [41:09] taken place to my [41:11] knowledge that has not not ever been [41:14] suggested forly in a board meeting there [41:17] have been occasions where [41:21] conversations there have been occasions [41:23] where conversations about that have [41:25] taken place and we've always [41:28] um uh made sure that we reminded the [41:32] board to remind its relationship with [41:35] the executive director Personnel matters [41:38] are matters that are generally within [41:40] the authority of the executive director [41:43] and uh the extent to which a board [41:46] member might be interested in [41:49] participating uh would suggest a [41:53] dilution of the uh executive director's [41:57] auor authority over hiring U and firing [42:00] so for that reason our advice has always [42:02] been it would be inappropriate to have [42:06] member okay I was just interested to [42:08] know how how brought diversity into the [42:11] process because I don't see a whole lot [42:12] of diversity in staff sure so we always [42:16] make sure we have you generally have a [42:18] four sometimes five but mostly four um [42:22] member panel for each Recruitment and um [42:26] there has to be [42:27] um minority representation as well as [42:30] representation from outside the [42:31] department okay what about [42:34] Community [42:36] people we've done that at times where if [42:40] we've had a position um one comes to [42:43] mind um it was our director of [42:47] Information Technology and we used a [42:50] member of the another municipality [42:53] another local entity um that had um [42:57] extensive Information Technology um [43:01] experience and understanding and they [43:03] were on the panel so we've other used [43:04] other municipalities that sort of thing [43:07] okay CU I was just thinking about people [43:08] that have knowledge of the community and [43:10] the diverse nature of the clientele that [43:12] the board serves as not a board member [43:15] that could participate in helping in the [43:17] process whether or not [43:19] that's outside of any rules or prohib is [43:24] prohibited I don't know if any law La [43:27] that prohibits it but some of the same [43:30] um concerns that were expressed about [43:33] board members about the delici of the [43:35] executive director's Authority okay we [43:38] tried very hard to maintain a pretty [43:41] bright line uh between U board member [43:47] conduct and Community conduct and the [43:50] executive director's authority over the [43:52] staff [43:57] okay I truly appreciate your interest in [44:00] questions thank you wait wait there one [44:01] oh I'm [44:02] sorry how are you no wor is good uh [44:06] silly question I was looking at your [44:08] graphs on page S8 kind of sort of and I [44:12] was wondering if all the interviews for [44:14] your positions are done in [44:16] person we try very hard for that um but [44:20] if there are people you know throughout [44:22] the the country and Beyond um sometimes [44:26] they are um virtual [44:29] interviews [44:30] okay on page nine I couldn't help but [44:35] notice and I don't know if this warrants [44:39] much analysis but when you look at the [44:42] hired percentages distribution across [44:45] the [44:46] categories they're very disproportionate [44:49] with the percentage of applicants in the [44:52] categories I'm sorry say that again I [44:54] just got to the right page sorry page [44:56] page nine sure [44:59] if you look at that last row on the [45:01] hired percentages by the categories [45:05] they're just they're disproportionate [45:07] with respect to the pool of applicants [45:09] in each of the categories sure we've [45:11] discussed that before and there's [45:13] probably a lot of reasons for that but I [45:15] just want you know paid attention thank [45:18] you on page [45:20] 10 um could you help me understand what [45:24] a protective service worker is and what [45:27] they do the definitions of the EO [45:30] categories of a protective service [45:33] worker yes I don't have that that [45:36] information in front of me I can let you [45:38] know um there are definitions that that [45:42] the eeo puts out for each classification [45:45] and I know in years past I have emailed [45:47] those to the board and I can do that [45:49] this time just curious sure thanks [45:53] that's all I [45:54] got thank you yes [45:57] yeah not yet [45:59] uh the uh Apprentice program that was [46:03] started in 2023 that's fantastic that we [46:05] got three folks as permanent absolutely [46:08] that's wonderful um [46:11] the uh on retention that would be on [46:14] page 10 of the package or page five of [46:17] the report [46:20] um uh do you have [46:24] um sort of historical retention number [46:27] maybe that you could send [46:28] around last five years seven years [46:31] something like that [46:33] um uh I [46:36] know the last few years we've had some [46:38] some difficulty [46:41] recruiting uh I don't know what why if [46:44] that's if there's been a retention [46:46] problem as well but that'd be useful to [46:48] to send around and and maybe include in [46:51] in you know future reports like this [46:53] sure uh do you have something specific [46:56] in mind or no just you know is is there [47:00] a pattern there uh are certain position [47:03] are we losing people in certain [47:05] positions uh more than others or uh [47:11] certain age age ranges were losing or I [47:14] you I don't know just it'd be [47:16] interesting from a pattern recognition [47:18] Point sure so I think I'd have to get to [47:21] the right page um we did spell out [47:25] information on the 20 people that we [47:28] left in this reporting period is that [47:30] the type of information that you're [47:32] looking for ex but but historic maybe [47:34] that's a normal those numbers are normal [47:36] but if they're uh abnormal relative to [47:39] history then that's a signal there's [47:40] something going absolutely yeah we can [47:42] certainly speaks to to the belonging [47:45] piece if your largest on on that [47:49] particular chart on page 10 if the [47:52] majority of your people that are leaving [47:56] everybody it's percentages and stuff [47:59] people that the retention number is [48:00] extremely high white and it's extremely [48:03] low for everybody [48:06] else so the belonging program could [48:09] probably use [48:13] some oh I think our work will never be [48:17] done and and the last one on uh page 11 [48:21] of the report 16 of the package so [48:24] there's a drop off in women in the last [48:27] three years or so uh is is that [48:32] consistent with numbers that other [48:35] Municipal municipalities have or other [48:38] organizations in the state or the region [48:41] any sure any color you can shine on that [48:44] I can look into that I I don't have that [48:46] information with me um the one thing [48:49] that um with this report it's one day [48:53] out of the year it's June 30th and we [48:56] look at the data on June 30th and that's [48:58] what we report to the board and so we [49:01] fluctuate so much throughout the year [49:03] but if we had um two three people leave [49:08] in the prior month it you know and then [49:11] we increase it the next month once we [49:13] recruit it just it's whatever it is on [49:15] that June 30th date and that's always [49:17] kind of yeah you know okay hurt my bell [49:20] a little [49:22] bit I have I have one question um it it [49:25] seems like you got a lot more [49:26] applications I'm just curious what you [49:28] did what did you do that Chang that well [49:30] I think it's it's in the report we went [49:32] to a lot of different um um events and [49:36] things like that I think you know we [49:39] attended the minority participation [49:40] program and learned a whole lot more [49:43] about how we can can recruit women we [49:46] went to the veterans and water Workforce [49:48] um the Central Carolina women and [49:50] business career focused event um I [49:53] personally went to several of these and [49:56] I attended the triangle Dei event one of [49:59] the best things I've ever attended in my [50:01] life and career on how to support [50:03] re-entry and re-engagement into the [50:05] workforce for those leaving [50:07] incarceration um they started it off [50:10] with a [50:11] 2hour um exercise where we played the [50:16] role of trying to get our social [50:17] security card and catch the bus to go [50:20] get all the documentation that we needed [50:22] and then try and get an interview and [50:24] how do we get to the interview if we [50:25] don't have any money and it it was one [50:27] of the best things I've ever attended so [50:30] all sorts of things and at those things [50:31] you make um networking opportunities and [50:35] and find out about all sorts of things [50:36] so we've got our new deib plan in place [50:40] and we're looking forward to to grow in [50:43] it even more um in the next [50:46] months thank you very much does anybody [50:48] else have any okay great thank you thank [50:51] you so much I appreciate the interest [50:53] okay and now we will move on to we have [50:56] three more excuse me the Capital [50:59] Improvements program semiannual report [51:02] um Allison and [51:04] Michael hey Elison hey Michael question [51:08] what do we use permanganate for at [51:11] University Lake we permanganate could [51:13] too control iron and [51:15] manganese so there's iron and manganese [51:17] in the reservoirs and when they reach [51:19] certain levels they can cause [51:22] um coloration of the water or taste and [51:25] odor issues and so we treat at the lake [51:27] and so that helps to allow enough [51:30] contact time for the iron and maganese [51:32] to interact with the oxidant to bring [51:34] that out of solution and then we remove [51:35] it during filtration great answer do we [51:37] have like a sump or something that we [51:40] add the chemicals to and then pump them [51:43] up here I mean what's the [51:45] process are you referring to the process [51:48] at Cane Creek or the process at [51:49] University Lake University Lake okay [51:51] perfect so at University Lake we have a [51:54] bulk tank of permanganate a sodium [51:57] permanganate Solution that's um now [52:00] housed in a a new building we used to [52:03] feed it out of chemical totes within the [52:05] existing Pump Station okay um but we've [52:07] now created a more reliable sustainable [52:10] solution that has it fully inclosed away [52:13] from the public all of that and so we [52:16] meter in the sodium permanganate into [52:20] the actual raw water line that comes out [52:22] of the pump station and that mixing that [52:25] happens from the pump station where it's [52:27] in injected into that raw water line it [52:30] it travels and mixes that whole way down [52:32] jonesberry road back to the water [52:33] treatment plant and then it enters into [52:36] the rest of the treatment facility and [52:39] there it it oxidizes out iron and [52:41] manganese and then that's captured [52:43] through the rest of the process like [52:45] infiltration cool thank you um might [52:48] have another question [52:54] sure um yeah so this is about on [52:59] page well it says two at the top but [53:02] this is kind of directed to the [53:04] engineering group I [53:06] think [53:08] that you know we say a conservable [53:10] amount of CIP work was accomplished [53:11] despite Staffing challenges which [53:13] continue through the year and to combat [53:16] this temporary project management [53:18] support from Jacobs um was provided I'm [53:20] just curious what what they did for us [53:24] they served as an acting project manager [53:26] so they sat here in our office at least [53:29] one day a week and then did ancillary [53:31] work um either at their home office or [53:34] um in the field doing Project work as if [53:38] they were assigned as a team member on [53:39] my team okay how many staff did you have [53:43] from Jacobs just one uhuh one [53:46] part-time cool daffer all right and kind [53:50] of one last request sure table [53:53] one I'm wondering if you all could [53:57] provide that spreadsheet form or some [54:00] other way that you know it's legible [54:03] when either we print it out or we want [54:05] to study it sure we were so effective [54:09] and productive there's so many on this [54:11] list this year so yeah we can definitely [54:13] do that so I I printed it out on tablet [54:16] paper so I can read it but I can't and [54:19] uh you know it'd be well suited to um [54:21] you know if I could get it into Excel [54:23] and split the screen and you know keep [54:25] column and Rose where I could have a [54:29] hard look at it' be great sure that's [54:30] how I produce it so it's easy enough for [54:32] us to share it thank you yeah no problem [54:35] thank you thanks okay two more um and [54:40] these are both Bruce so the first one is [54:42] number six the preliminary financial [54:44] report for the 12-month period ending on [54:47] June 30th [54:49] 2024 okay um s excuse uh so on the [54:53] system development fees dollars are not [54:57] large but there's a huge variance uh the [55:00] the actual is 2.7 million the budget was [55:03] 1.0 I may show my ignorance here but it [55:07] would seem to me that we have pretty [55:09] good visibility into um the the system [55:14] development projects we're going to do [55:17] uh so why is it off so much is there [55:21] something else going on or it's uh I may [55:25] not be the best person that answer this [55:26] and I'm looking around and I think the [55:27] person that is might not be here no he's [55:30] he's oh sorry on the wrong side of the [55:35] room uh fish nuk and gather director of [55:38] engineering so system development [55:40] projects we do track them and try to [55:42] provide as good you know as good of a [55:44] forecast as we can um just like our own [55:47] CIP projects they're so many of them are [55:50] subject to you know changes and delays [55:53] accelerations and I think this there was [55:56] one project in particular that was [55:58] accelerated if I'm okay if I'm [56:01] remembering correctly so we actually [56:03] don't have very good visibility into [56:05] what's going to happen okay that's fine [56:07] that's fine okay I I you know I'm a [56:12] pattern matcher type of person and when [56:15] I see big variances that I always wonder [56:17] if there's something hidden behind it [56:18] but that okay that's [56:20] great anybody else have anything on that [56:23] one and then this our last one um number [56:26] nine the review proposed work plan for [56:29] aasa's executive director okay and Todd [56:32] this one on on uh item number two for [56:36] you Financial Management number B says [56:39] monitor financial and fraud management [56:41] as well as customer building monitor [56:44] sounds too weak to me I sure would like [56:46] to have something like you know ensure [56:49] that we have the proper controls in [56:52] place rather than just monitoring what's [56:54] going on does that make sense absolutely [56:59] okay is that [57:03] so I wrote ensure that proper controls [57:07] are in place for financial and fraud [57:10] management as well as customer billing [57:14] performance it's on page 42 of the [57:16] package can I can I ask one question [57:18] from page 43 um do you know when we'll [57:20] get an update on care to share and in [57:23] coming in house I think we're planning [57:27] on if I'm correct yeah it's like January [57:31] February time [57:33] great about that all right so here's [57:37] what we're going to do now we pulled [57:39] items two four five six and nine and if [57:44] there are no additional questions or [57:45] comments may I have a motion and second [57:48] to approve 24 five six nine I'll make a [57:52] motion great thank you [57:54] Michael Bruce all right we have a motion [57:58] by Michael and a second by Bruce all [57:59] those in favor please say I I I I okay [58:03] the motion for those items on the [58:06] consent agenda um passes [58:10] unanimously we will now move on to the [58:13] regular [58:14] agenda and this first item is [58:18] exciting um it is a resolution honoring [58:21] the service of Mary Dar to the Chapel to [58:24] the carboro Chapel Hill Orange County [58:27] Community um so I'm going to read this [58:30] out loud would you like to come to the [58:33] podium [58:36] love okay so I'm going to read from here [58:39] and then I will come to the podium [58:42] whereas after working more than 30 years [58:45] as an aasa professional engineer Mary [58:48] Dar will retire on November 1st 2024 [58:51] from her present position as Deputy [58:53] executive director and the board of [58:56] directors wishes to thank her for her [58:58] work as an essential Public Employee in [59:01] service to our community and whereas [59:04] Mary began work for aasa in [59:07] 1994 as a utilities engineer where she [59:10] soon became known for her willingness to [59:12] undertake and complete the difficult and [59:14] often complicated projects necessary to [59:17] guide the operation and support the [59:18] replacement and new construction of [59:20] water and sewage infrastructure vital to [59:23] the life of our community she was [59:25] promoted to serve as operations engineer [59:28] director of engineering and planning and [59:30] then as general manager of operations [59:32] and she will retire having most recently [59:34] served as Deputy executive director of [59:36] aasa and whereas Mary well and [59:39] Faithfully performed her [59:41] responsibilities including management of [59:43] aasa's water supply water distribution [59:46] and Wastewater collection systems its [59:48] water and wastewater treatment plants [59:51] its reclaimed water system along with [59:53] its Laboratories and maintenance [59:55] operations she will be remembered by her [59:57] colleagues for her warm smile and [59:59] enthusiasm in service with all of them [1:00:01] and her willingness to notice and then [1:00:03] to help those who needed a lift or a [1:00:04] hand up or some thoughtful suggestion to [1:00:06] help them through their day indeed it is [1:00:10] remarkable that even with so many [1:00:12] responsibilities Mary always found time [1:00:14] to help whoever needed her encouragement [1:00:17] and whereas throughout her career she [1:00:20] was instrumental in planning and [1:00:22] executing projects such as the [1:00:24] preparation of aasa's sewage use [1:00:26] ordinance which today protects aasa's [1:00:29] sewage sewer infrastructure from [1:00:31] dangerous and damaging inflows she was [1:00:33] in charge of various award-winning [1:00:35] projects that brought National and [1:00:37] international recognition to aasa [1:00:39] including the 2005 partnership for Safe [1:00:42] Water directors award and the 2011 [1:00:45] excellence in water treatment award she [1:00:48] was also project manager for the [1:00:49] construction of the operations center a [1:00:52] building intended to build relationships [1:00:54] between the engineering and operations [1:00:56] staff and whereas Mary Dar has earned [1:01:00] the admiration and respect of co-workers [1:01:02] at aasa our local governments the [1:01:04] University of North Carolina at Chapel [1:01:06] Hill and other professionals within the [1:01:08] National Water and Sewer industry her [1:01:10] character and her work will now serve as [1:01:12] her Legacy to aasa and our [1:01:15] community now therefore be it resolved [1:01:18] that the board of directors of the [1:01:20] orange water and sewage Authority hereby [1:01:23] honors and expresses its sincere [1:01:24] appreciation for the distinguished [1:01:27] Public Service of Mary Dar PE to aasa [1:01:30] and the people of carboro Chapel Hill [1:01:32] and Orange County and the Border [1:01:33] directors extends our best wishes to [1:01:35] Mary for good health and happiness in [1:01:37] your retirement may I have a motion and [1:01:40] second to approve the [1:01:42] resolution P [1:01:45] Pedro [1:01:46] Bruce okay we have a motion by Pedro and [1:01:49] a second by Bruce I'm getting teary all [1:01:51] those in [1:01:54] favor all those in favor please say [1:01:57] I the motion passes unanimously and the [1:02:00] resolution is approved congratulations [1:02:02] thank [1:02:20] you that was [1:02:29] [Music] [1:02:30] [Laughter] [1:02:47] are there any public [1:02:49] comments there is [1:02:54] one I'm going to get my [1:02:57] water okay yes so um Ed Kerwin really [1:03:02] wanted to be here tonight he was a [1:03:03] wasa's executive director from 1996 to [1:03:07] 2020 um and again he very much wanted to [1:03:10] deliver his remarks about Mary Dar in [1:03:13] person at tonight's meeting but he's [1:03:15] under the weather and asked me to read [1:03:18] his um comments on his behalf so I'm [1:03:22] doing this all for Ed so it sounds like [1:03:24] he's right here [1:03:26] you're welcome all right I join the aasa [1:03:30] board of directors general counsel and [1:03:33] staff in acknowledging and thanking Mary [1:03:36] Dar for her 30 years of progressively [1:03:39] responsible and truly impactful Public [1:03:42] Service Mary has always worked very [1:03:45] effect effectively with others [1:03:47] throughout the organization and [1:03:49] Community to ensure aasa successfully [1:03:52] fulfills its critically important resp [1:03:55] responsibilities to provide Chapel Hill [1:03:59] carboro the university and Southern [1:04:01] Orange County with high quality and [1:04:04] reliable water services around the clock [1:04:07] in doing so Mary always displayed [1:04:09] genuine caring for others she's a true [1:04:12] team player Mary's very knowledgeable [1:04:15] and experienced in nearly all aspects of [1:04:17] aasa's operation and she has freely [1:04:20] shared her knowledge support and [1:04:22] guidance with others [1:04:27] if I [1:04:29] had if I had to pick and highlight just [1:04:32] one of Mary's many accomplishments that [1:04:34] would that will continue to benefit our [1:04:37] community in the years ahead it is the [1:04:40] inspired leadership role she had guiding [1:04:42] our team to further improve our drinking [1:04:44] water quality this resulted in aasa [1:04:47] becoming the only becoming only the [1:04:50] ninth water treatment plant in the [1:04:52] country and the first in North Carolina [1:04:55] to be awarded the Excellence in water [1:04:57] treatment award by the partnership for [1:04:59] safe water in 2011 the partnership for [1:05:03] Safe Water comprises six organizations [1:05:05] including the EA and the American [1:05:08] Waterworks [1:05:09] Association this award acknowledged that [1:05:11] a the aasa team was operating a fully [1:05:14] optimized water treatment process the [1:05:17] aasa team has suain sustained this level [1:05:20] of drinking water and treatment [1:05:21] optimization for over 10 years Mary [1:05:24] would be the first [1:05:26] to give full credit to all her [1:05:28] co-workers for this [1:05:30] accomplishment please know that Mary [1:05:32] effectively LED our very inclusive [1:05:34] process with Frontline staff and many [1:05:37] others throughout aasa this initiative [1:05:40] was an important part of our overall [1:05:42] work building a culture of teamwork [1:05:45] continuous Improvement and performance [1:05:48] Excellence I'm so proud of how this [1:05:50] initiative has been successfully [1:05:52] expanded by the aasa team and Water [1:05:55] District distribution Wastewater [1:05:57] collection treatment and reuse Mary [1:06:00] would also be quick to give credit to [1:06:02] the board for providing employees with [1:06:05] competitive pay benefits and for [1:06:08] supporting policies and funding to keep [1:06:10] the organization sustainable I work [1:06:13] closely with Mary and I could always [1:06:15] count on her to share her ideas and how [1:06:17] we can improve especially when there [1:06:20] were they were different than [1:06:22] mine which which makes for a healthy [1:06:25] work envir ironment Mary it was a true [1:06:28] pleasure and privilege working with you [1:06:31] and I thank you so very much for your [1:06:32] dedicated service wishing you all the [1:06:35] best and good health and retirement Ed K [1:06:39] and [1:06:47] Andy thank you [1:06:52] Ed my turn yeah wow [1:06:57] okay um anyways I just want to thank you [1:07:01] Mel for the resolution that was lovely [1:07:04] um I just want to thank the board this [1:07:06] board and the previous boards for the [1:07:08] last 30 [1:07:10] years I'm not gonna make it through [1:07:14] retirement um for all the support I want [1:07:17] to thank Bob Todd Ed K Andy and all the [1:07:21] staff um for the support through all the [1:07:24] years um um AAS has been a great place [1:07:27] to work staff supports one another we've [1:07:30] heard that over and over again tonight [1:07:32] um and the board support staff and [1:07:34] that's really important so thank [1:07:41] you Bob say [1:07:44] something anyways I really do truly [1:07:47] appreciate all the opportunities I've [1:07:49] had um and I also appreciate um that the [1:07:53] board's allowed me and AAS has allowed [1:07:55] me to give back to the professional [1:07:57] organizations and the industry um [1:07:59] through volunteer work and uh presenting [1:08:02] at conferences and all the Innovative [1:08:04] stuff that aasa does so thank you very [1:08:19] much that was great [1:08:25] so the board will now move on to [1:08:27] information and reports thank you Mary [1:08:30] um we will get a update on the service [1:08:32] line inventory and replacement program [1:08:35] Mary tiger the director of community [1:08:37] relations and Jesse duclaw the director [1:08:39] of distribution and collection we'll [1:08:41] provide a 15minute uh [1:08:44] presentation all right that was a very [1:08:47] inspiring presentation to follow up on [1:08:50] so um I just want to start this [1:08:53] presentation tonight by acknowledging [1:08:56] the massive team effort that this whole [1:09:00] program is and preparing for uh the [1:09:03] compliance with the lead and copper rule [1:09:04] has been um I stand here as one person [1:09:07] why the director of community relations [1:09:09] is talking about it is that this whole [1:09:11] program is getting ready to take a turn [1:09:13] for a very public facing phase um and so [1:09:17] we want to make sure that the board is [1:09:20] up to date on the what and the wise of [1:09:22] what we're talking about when we talk [1:09:23] about the service line inventory and [1:09:25] this pending replacement [1:09:28] program I also want to acknowledge that [1:09:30] massive team effort it's led by aliceon [1:09:33] Spinelli um our engineering manager for [1:09:36] capital [1:09:38] projects so before we jump into the [1:09:41] details of this program I do want to [1:09:43] assure the board and the public that's [1:09:45] watching we're not talking about this [1:09:47] because aasa has a problem with lead um [1:09:50] this is a national requirement for all [1:09:52] Water Systems um that is above and beond [1:09:55] beyond the existing lead and copper rule [1:09:58] which aasa is in full compliance with um [1:10:02] that original rule was passed in um [1:10:05] 1991 so the water leaving our water [1:10:07] treatment plant has no lead in it and we [1:10:10] have no known lead pipes in our [1:10:12] distribution system that being said lead [1:10:15] can enter drinking water through [1:10:18] Plumbing um this diagram here on the [1:10:20] screen is a one that's put out by EPA [1:10:23] that shows how lead can enter drink [1:10:25] drinking water through private Plumbing [1:10:28] we add um Ortho and polyphosphate to our [1:10:31] water to prevent the corrosion of pipes [1:10:33] and plumbing fixtures um kind of coats [1:10:36] the pipes um this is a consistent [1:10:38] practice with um state and federal [1:10:41] guidelines additionally every three [1:10:43] years we collect 30 samples from homes [1:10:46] with copper pipes and Lead solder and [1:10:49] since 2008 we have only detected lead in [1:10:53] six of these sample sites and only one [1:10:55] of those was above the um Action level [1:10:58] and then for that one particular site [1:11:01] that home had no other um lead detects [1:11:04] and it was cleaned out once they cleaned [1:11:07] out their air Rader um so again we're [1:11:10] not talking about this because we have [1:11:12] an issue it's a it's a national [1:11:15] requirement in December of 2021 the EPA [1:11:18] finalized the revised lead and copper [1:11:21] rule which enhanced the existing [1:11:23] regulation in a number of ways [1:11:25] so for the purposes of our discussion [1:11:27] tonight we're really going to focus on [1:11:28] three major aspects of this regulation [1:11:31] and that is the lead service line [1:11:33] inventory public education and Outreach [1:11:36] and the lead service line [1:11:39] replacement and a big driver of this [1:11:42] kind of Latter um topic the lead service [1:11:45] line replacement program is the lead and [1:11:49] copper rule improvements or what we call [1:11:51] the [1:11:52] LC so this is a proposed revision to the [1:11:56] revised rule that is currently in draft [1:11:59] form so it is not finalized yet we [1:12:02] expect this rule to be finalized anytime [1:12:06] now um but it impr it enhances or [1:12:10] improves the the new rule and so it's a [1:12:13] it's a bit speculative in nature but [1:12:16] most in the industry are expecting it to [1:12:18] be passed as drafted again later this [1:12:22] year so we have folded in the [1:12:24] requirements [1:12:25] of that proposed rule into our [1:12:28] preparation for the [1:12:31] LCR and the when we talk about the [1:12:34] replacement program the LC is actually [1:12:38] requiring replacement of any lead or [1:12:41] galvanized lines that are requiring [1:12:43] replacement within 10 years of going [1:12:45] into effect so it kind of enhances that [1:12:48] replacement requirement um on top of the [1:12:53] LCR so just to pause and Define what [1:12:57] what is a service line when we talk [1:12:58] about service line inventory service [1:13:00] line replacement so a service line is [1:13:03] the extend of pipe that connects the [1:13:05] water m to the building Plumbing the [1:13:08] portion of that line that between the [1:13:11] water man in the meter is a wasasa it's [1:13:13] owned by aasa we put it in the ground [1:13:16] the portion of the pipe that's between [1:13:19] the meter in the home is the [1:13:20] responsibility and under the ownership [1:13:22] of the property owner um so up until the [1:13:25] LCR Water Systems really had no no [1:13:29] knowledge of the private side of the [1:13:31] service line or responsibility for [1:13:34] it the lead and copper rule revisions of [1:13:37] the LCR requires Water Systems to take [1:13:40] inventory of all the service lines in [1:13:42] their service area there's really four [1:13:44] buckets that we want to put those [1:13:47] service lines into in this inventory [1:13:50] first bucket is lead status unknown this [1:13:53] is a completely valid category for the [1:13:56] initial inventory that's due next month [1:13:59] that we just don't know the second [1:14:02] category is pretty self-explanatory lead [1:14:04] service line so a portion of the pipe is [1:14:07] made out of [1:14:08] lead the third category is a galvanized [1:14:11] service line now galvanized service [1:14:13] lines in and of themselves are not an [1:14:15] issue but if they were ever Downstream [1:14:18] of lead pipe they could have collected [1:14:20] lead particles which could be freed up [1:14:23] if there's a disruption in the [1:14:26] distribution system so if there is a [1:14:28] loss of pressure uh a meter is changed [1:14:31] out service is cut on or off um if a [1:14:34] galvanized line was ever Downstream of [1:14:37] lead pipe it could have collected [1:14:39] that if the utility if aasa cannot prove [1:14:44] that a galvanized line was never [1:14:46] Downstream of a lead pipe we have to [1:14:48] assume that it some point it was so it's [1:14:50] a out of an abundance of caution that we [1:14:53] are considering galvanized service lines [1:14:55] as galvanized requiring [1:14:58] replacement and then this final category [1:15:02] non-led um non-led could be any number [1:15:04] of materials U most commonly copper or [1:15:07] plastic and ultimately the goal of all [1:15:11] of this all of the regulation and aasa [1:15:13] efforts are to get all of the service [1:15:15] lines into that last category that's the [1:15:18] that's the goal um so how are we doing [1:15:21] with this incredible really really in [1:15:25] incredible um aasa's efforts to to [1:15:28] bucket the utility or the the service [1:15:30] lines so a little bit about how our [1:15:33] process went of how we went about doing [1:15:34] that we first looked at um historical [1:15:38] work orders and Records to identify the [1:15:40] service line [1:15:41] materials then we looked at the size of [1:15:44] the line and the date of the [1:15:46] installation so service lines that are [1:15:48] greater than three in are non-led we [1:15:50] know that categorically so and any [1:15:53] service line that was installed after [1:15:55] March of 1987 we can categorically rule [1:15:58] out as as not L because a ban went into [1:16:00] place at that time so once we have this [1:16:03] historical a after we had this [1:16:05] historical information we begin an [1:16:07] iterative process of doing field [1:16:10] verification and machine learning so [1:16:12] doing statistical analysis using those [1:16:15] field verifications to draw conclusions [1:16:18] about what the service line material is [1:16:20] and this is a practice that's accepted [1:16:22] in the state we've turned over our [1:16:23] methodology to the State and they have [1:16:25] approved our statistical um verification [1:16:29] method so to date um over 6,000 customer [1:16:33] side services and all of the 78 unknown [1:16:36] aasa side Services have been inspected [1:16:39] and in fact aasa was awarded a $1 [1:16:42] million no interest interest loan from [1:16:44] the bipartisan infrastructure law [1:16:46] drinking water State revolving fund Leed [1:16:48] service line replacement funds to fund [1:16:51] our inventory work um and effectively [1:16:53] reimburse aasa for this work you guys [1:16:56] actually um approved the acceptance of [1:16:58] those funds um in the consent [1:17:00] agenda so if this sounds easy it [1:17:03] absolutely was not and so I'm going to [1:17:05] invite our director of distribution and [1:17:07] collection Jesse duclaw to acknowledge [1:17:10] the team that put in the work that got [1:17:12] us to this incredible [1:17:15] place thank you Mary I'm Jesse duclaw [1:17:17] distrib director of distribution and [1:17:19] collection I want to start by saying in [1:17:22] my February March budget present a about [1:17:25] some of the challenges this is one of [1:17:26] the challenges we talked about and how [1:17:28] big of a task this is and how big of a [1:17:30] challenge it is um it would not be [1:17:32] successful without the team that I have [1:17:34] as well as Alison spelli as the champion [1:17:37] of the whole Le copper rule um [1:17:39] addressing as well as uh Communications [1:17:41] and Community rations department and [1:17:43] what they've done but specifically I [1:17:45] want to say Marcus Fuller if you stand [1:17:48] up Marcus is our crew Supervisor over [1:17:51] valve maintenance and him and his team [1:17:52] have went under more than [1:17:55] 5,000 um as you see Josh patzer in this [1:17:58] uh in this picture right here under [1:18:00] 5,000 crawl spaces in identified this so [1:18:03] they have the leg work behind all this [1:18:05] but also Nick Rogers if you would stand [1:18:07] up he is uh the orc of our distribution [1:18:10] system and he's been working with the [1:18:11] teams to uh you know put this to the [1:18:14] front of our goal and in front of our [1:18:15] list to get it tackled in time so I want [1:18:18] to say thank you [1:18:27] thank you Marcus thank you [1:18:29] Jesse so where do we go from here so the [1:18:32] initial inventory is due to the state by [1:18:35] October 16th um and it must be available [1:18:38] for all customers so we will be posting [1:18:41] this inventory on our website and then [1:18:43] within 30 days of posting that we will [1:18:45] be sending um direct notification to all [1:18:49] of our customers that have the [1:18:50] galvinized requiring replacement lines [1:18:53] which didn't actually talk about so we [1:18:54] have [1:18:55] 110 um lines that that we estimate and [1:18:59] we determine to be galvanized requiring [1:19:01] Replacements the rest are non-led um so [1:19:05] our um because of the work of Marcus and [1:19:08] his crew um at narrowing that down we [1:19:11] really are focused only on these 110 [1:19:14] galvanized requiring replacement lines [1:19:16] and [1:19:18] customers so we'll be sending Outreach [1:19:20] to them about what it means to have a [1:19:23] galvanized requiring replacement line um [1:19:26] and and where we're going from here um [1:19:30] this is a sneak peek at what the what [1:19:34] the inventory is going to look like [1:19:36] that's posted on our website um so [1:19:40] customers will be able to enter their [1:19:42] address and zero in but they'll see from [1:19:44] a a broad scale all of the service lines [1:19:48] in the community um and then colorcoded [1:19:50] based on is it lead status unknown [1:19:53] non-led Le or galvanized requiring [1:19:55] replacement and it's amazing that we can [1:19:58] pull up a map that says you know as many [1:20:01] non-ls um as we do if somebody types in [1:20:04] their address they'll zero in um and be [1:20:07] able to see a DOT at their property um [1:20:11] and it will show there's two sides of [1:20:13] the circle one is the Utility side one [1:20:16] is the private side um and it'll say [1:20:18] what we what the material is of both [1:20:21] sides and how we got that information so [1:20:23] this particular address the Utility side [1:20:26] material is copper the private side [1:20:28] material is unknown but we determined it [1:20:30] to be not Le um the source of the [1:20:34] Utility side how we got that information [1:20:36] is through historical records and then [1:20:39] how we um determine the private side is [1:20:41] through that predictive modeling so we [1:20:44] will also have information on our [1:20:45] website about what is predictive [1:20:46] modeling and how did we get there how [1:20:48] did we get to [1:20:50] that this one which on that screen is [1:20:53] worse than on this screen [1:20:55] so is what the dot will look like for [1:20:58] one of the 110 households that has a [1:21:01] galvanized requiring replacement so [1:21:03] they'll zero in on their property and be [1:21:05] able to see that and then we will have [1:21:08] information for those customers about [1:21:10] again what exactly does that mean what [1:21:12] is the risk of having a galvanized [1:21:14] requiring replacement what can they do [1:21:17] um as a property owner or a tenant to [1:21:19] reduce that risk and then what are our [1:21:21] plans moving forward on the replacement [1:21:23] program what we know now and then how we [1:21:26] will communicate about what we know in [1:21:27] the [1:21:29] future I see some yeah I I was gonna say [1:21:32] can you just tell us briefly what the [1:21:35] plan would be going forward for those [1:21:37] 110 folks I will get there yes yeah are [1:21:41] they clustered in a certain geographic [1:21:42] area are they kind of spread out they [1:21:45] are so more so in the downtown area [1:21:49] because they're the older homes like we [1:21:51] can there is but there's no kind of [1:21:54] pattern Trend actually turn it to [1:21:56] Allison who's been looking a lot more at [1:21:58] the the data the prevalence because this [1:22:00] is a sneak peek I say because we really [1:22:03] are like doing this machine learning um [1:22:06] kind of hot off the [1:22:07] presses did I [1:22:11] answer um Mary answered it appropriately [1:22:14] a lot of it is clustered very closely to [1:22:16] where we have older sections of town and [1:22:18] maybe areas that haven't been [1:22:19] revitalized or redeveloped where um the [1:22:22] service lines would have been renewed [1:22:23] for another reason so it's a lot of [1:22:25] older homes or um just areas that have [1:22:28] an experience for [1:22:30] development both both I'm curious uh [1:22:35] using a predictive model uh you'd have [1:22:38] to train that on positives so if there's [1:22:42] so we would never predict lead in our [1:22:45] predictive model because we will never [1:22:47] find lead because we have no known lead [1:22:49] sources of any pipe in our distribution [1:22:52] system now we have found through all of [1:22:55] the work that Marcus's team with Jesse [1:22:57] and Nick have done over 78 um service [1:23:00] lines on the private side that have been [1:23:02] galvanized which is training the model [1:23:04] in those certain areas that we may be [1:23:07] more likely to see galvanized we also [1:23:09] did have some galvanized showing up in [1:23:10] some of our original records so that's [1:23:12] also been training the model too um one [1:23:15] of the slides Mary showed earlier was [1:23:18] there was the bar graph that showed from [1:23:21] last June till now thank thank you um [1:23:25] that there was an initial goal of 2,000 [1:23:27] that was the initial training set that [1:23:29] we used so we needed to get 2,000 [1:23:32] physical inspections done on service [1:23:35] lines in order to have enough data to [1:23:37] run the model for the first time and [1:23:40] then based on that model it gave us the [1:23:43] next sets of data that we needed to try [1:23:46] and find to fill the gaps where we [1:23:47] didn't feel like we had the right level [1:23:49] of um accuracy in terms of predictions [1:23:57] a question on the model that sort of [1:23:59] feeds it to how we communicate this to [1:24:01] people is was the [1:24:03] model like a traditional statistical [1:24:06] model where you have parameters that are [1:24:07] variables that have coefficients that [1:24:09] are predicting something some number or [1:24:11] it was it more of a neural network and [1:24:12] you don't really [1:24:15] know what the what led to a particular [1:24:17] house being [1:24:20] flagged it is more of a neural network [1:24:22] if I understand um so we using a [1:24:24] software called lead cast and a lot of [1:24:26] it is being done by their data analytics [1:24:28] we are feeding the model through our [1:24:31] work but I am not as familiar as some of [1:24:34] the background data that might be in [1:24:37] there [1:24:43] okay one of the positives and bit on it [1:24:46] that we do have in the model or the [1:24:48] galvaniz requiring replacement as she [1:24:51] said we don't anticipate any lead but [1:24:54] that would be the positive in the [1:24:56] model are you still do you still have [1:24:58] slides uh okay why don't we hold [1:25:02] questions until the [1:25:07] end [1:25:09] sorry so a little bit about the kind of [1:25:11] communication that we do with these 110 [1:25:14] customers so I mentioned that we'll send [1:25:16] a letter within 30 days of publishing [1:25:17] the inventory and then we will send [1:25:21] those customers a letter annually [1:25:24] reminding them about their service line [1:25:25] we also will send any new customer that [1:25:27] moves into that um household information [1:25:31] about that once as we figured out out [1:25:34] the replacement program we'll be [1:25:35] communicating directly with those [1:25:37] customers as well um and then also if [1:25:39] post disturbance so if we have a water [1:25:41] line break if we do a disconnection or [1:25:45] um any sort of um instances that could [1:25:49] free up potential lead in those lines [1:25:51] we'll be communicating with those [1:25:53] customers um about steps that they can [1:25:55] take to minimize their risk and in some [1:25:58] cases when there's a major disturbance [1:26:00] we will be providing them with uh [1:26:02] pictures picture filters um and six [1:26:05] months of [1:26:06] filters so I want to point out here that [1:26:09] the Outreach for customers with unknown [1:26:12] service lines this would be the [1:26:14] requirement for our communication with [1:26:15] customers so in with a Wasa setting a [1:26:18] goal of having no unknowns it really [1:26:21] minimizes a lot of necessary [1:26:25] communication and kind of red flag [1:26:27] raising for our community so it's a [1:26:30] really important thing that aasa did and [1:26:33] um having zero [1:26:39] unknowns so beyond this where do we go [1:26:42] so when we think about the lead and [1:26:44] copper rule improvements so the [1:26:47] requirements around that in the [1:26:49] replacement program so that rule is [1:26:52] going to require that you utility submit [1:26:55] a baseline inventory to the state we're [1:26:57] estimating around October [1:27:00] 2027 and that Baseline will set the 10% [1:27:03] replacement rate that's required over [1:27:05] the next 10 years so from that point [1:27:07] forward every year utilities will be [1:27:09] required 10% to replace 10% of their [1:27:12] Leed galvanized requiring replacement or [1:27:15] unknown service lines um and so that [1:27:19] sets the um sets the Baseline of how [1:27:24] having any unknown um and then so then [1:27:27] 10 years later than that all known lead [1:27:30] and galvanized requiring service lines [1:27:32] must be replaced um with [1:27:35] non-led is that the private service line [1:27:38] or public service private service line [1:27:40] are going to be required to be [1:27:42] replaced and aasa absorbs the cost of [1:27:46] that it is not required in the [1:27:48] regulation that the utility pay for the [1:27:51] replacement of the service line we do [1:27:54] have we'll go to the next slide so our [1:27:56] five-year CIP a budget to replace those [1:28:00] service lines and at that point time we [1:28:02] were estimating that we had more than we [1:28:05] had over we were estimating that we [1:28:06] would have over 300 lines and so that [1:28:09] 3.2 million and the 5year CIP was for [1:28:12] that um we do estimate that it's about [1:28:15] $110,000 per service line to replace [1:28:18] that service line one of the reasons why [1:28:21] we're making the recommendation to move [1:28:24] move forward with aasa paying for the [1:28:27] service line replacement one is that [1:28:30] it's compliance with regulations we will [1:28:31] be held to that 10% replacement rate um [1:28:35] and so it's incredibly important that we [1:28:38] comply with that regulation one is it [1:28:40] helps to ensure that it's Equitable in [1:28:43] terms of when the service lines are [1:28:45] replaced um if you can pay for a [1:28:48] replacing a service line you're going to [1:28:49] do it early if aasa can pay for it we [1:28:52] can ensure that it happens um in a in a [1:28:55] fast Manner and that it's done in an [1:28:57] equitable way um and further it reduces [1:29:00] the operational and contractual [1:29:02] challenges so if we were to drag it out [1:29:05] we are looking for a timeline of between [1:29:07] 2025 and 2027 of replacing all those 110 [1:29:12] service lines um and we want to do it in [1:29:15] that tight time frame because we [1:29:16] anticipate that contractually that will [1:29:19] be more attractive to anybody bidding on [1:29:21] on this project um and then further it's [1:29:24] going to reduce you know operational [1:29:26] challenges when we talk about [1:29:28] communicating with customers time and [1:29:30] time again about having these galvanized [1:29:32] lines um if we can knock those out and [1:29:35] we can turn in that Baseline inventory [1:29:38] in 2027 then we can kind of put this [1:29:41] behind us and and move forward um so [1:29:44] right now our estimated program costs [1:29:46] based on the 110 galvaniz requiring [1:29:48] lines that we um estimate to have is [1:29:51] about $1.3 million [1:29:54] we have some things to figure out this [1:29:56] is a atypical project for us right [1:29:58] that's on private property um we do know [1:30:01] that we are going to need ride of entry [1:30:03] from the customers we're going to need [1:30:05] their permission to um come and replace [1:30:07] their service line we anticipate that [1:30:10] we're going to do this work through a [1:30:11] general contractor that will work with [1:30:13] licensed plumbers in the region we're [1:30:16] going to have an open house on October [1:30:18] 11th here in the community room to talk [1:30:21] with local General Contractors local [1:30:23] plumbers local plumbing supply houses [1:30:26] about the program and get some of their [1:30:28] feedback um that will be considered in [1:30:31] the bid package so we can put something [1:30:33] attractive out that will actually get [1:30:35] bid on um but we know we have a lot of [1:30:38] important things to consider to in [1:30:40] setting up this replacement program the [1:30:42] order of replacement although we want to [1:30:44] do it in a pretty timely manner someone [1:30:47] has to go first we can't replace 110 [1:30:50] service lines in one day so there there [1:30:52] will be an order and and how that is [1:30:54] ordered um we've got to consider how to [1:30:56] handle customers that don't want to work [1:30:58] with an aasa contractor but are still [1:31:00] going to be part of that you know [1:31:02] requirement and then how how to handle [1:31:05] customers that maybe recently replaced [1:31:07] their galvanized service line and now [1:31:10] you know they footed the bill and and [1:31:12] now a Wasa is paying so there's and [1:31:14] there's a list of other considerations [1:31:17] that we need to think through as we [1:31:19] design this program luckily we're not [1:31:22] first um a lot of Utilities in the [1:31:25] Northeast um and Out West have already [1:31:27] gotten started on similar programs [1:31:30] Raleigh down the road has gotten started [1:31:32] on their replacement program so we have [1:31:34] some peers that we can look to for some [1:31:36] lessons learned [1:31:40] um so um with that you know we will [1:31:44] certainly be informing the board as we [1:31:46] figure out those details of the [1:31:48] replacement program and no action is [1:31:52] asked of you all tonight but again it is [1:31:54] a very public facing we're moving into [1:31:57] this public facing phase and wanted to [1:31:58] make sure that you all had the [1:32:00] opportunity to ask questions and really [1:32:02] understand um what is going on so I'll [1:32:05] turn it back over to Mel and yeah team [1:32:08] is happy to answer questions thank you [1:32:11] all three of you for that great [1:32:13] presentation [1:32:14] um what what questions do we [1:32:19] have Kyle and then Pedro yes amyra Kim [1:32:25] um two questions uh one probably minor [1:32:29] is this document says there were 180 at [1:32:33] most and now here's 110 does that mean [1:32:35] like they were flagged you check them [1:32:36] and [1:32:38] 70 at the time of writing the memo that [1:32:41] was the estimate and as the machine [1:32:43] learning the last iteration of the [1:32:45] machine learning has come through that's [1:32:47] um been able to be tighten down a little [1:32:49] bit gotcha and then um [1:32:54] maybe it's not I'm guess I'm just [1:32:57] curious like if I were to go to this map [1:33:00] I like and I see unknown notled if I'm a [1:33:04] cautious person I might be [1:33:06] like so like is is the map going to be [1:33:08] behind a wall that explains the [1:33:11] categories first or can there be like a [1:33:12] tool tip on on that one that explains [1:33:15] like if it's three inches of 1987 and [1:33:18] why I should trust [1:33:20] those things we will be providing [1:33:23] information about the categories and how [1:33:24] we arrived at the information [1:33:28] yes my question I'm sorry I lost a [1:33:31] little bit of the presentation as I went [1:33:33] to the bathroom and apologize for that [1:33:36] um I need to [1:33:39] go anyway uh my question is on on regard [1:33:44] of the uh service line is that after the [1:33:48] uh [1:33:49] meter the piece of service line that we [1:33:52] are going to replace [1:33:54] which is considered private is that what [1:33:57] we're talking about yes that's what [1:33:59] we're talking about we have um no known [1:34:01] galvanized requiring replacement on the [1:34:03] on our side of the meter and so we're [1:34:06] really going to be looking at that the [1:34:08] property owned side service line thank [1:34:13] you okay thank you regarding the [1:34:17] selection of the contractors that's [1:34:18] going to replace that portion of the [1:34:20] line that was is going to pay for is [1:34:23] there a bid [1:34:26] process that you use to select the [1:34:29] people the different contractors that's [1:34:31] going to come go out and um make these [1:34:35] changes thanks alar that's a good [1:34:37] question so we are going to use a [1:34:39] typical bidding process that we would [1:34:41] for any other construction project it [1:34:43] will be based off of a set of [1:34:45] specifications the contractors will be [1:34:47] given the different 110 locations with [1:34:50] the requirements for each location and [1:34:53] based off of that they will provide I'm [1:34:56] not 100% sure it'll be a single lump sum [1:34:58] or if it'll be like unit price bidding [1:35:00] but they'll provide a number and low bid [1:35:02] will be inspected to see if they're [1:35:04] responsive responsible safe kind of our [1:35:07] normal procedure so you expect to have [1:35:08] one company do all of it or can you have [1:35:12] multiple companies it would be our [1:35:14] preference from a Contracting standpoint [1:35:16] to do one contract um with a general [1:35:19] contractor who then could choose to have [1:35:22] several different [1:35:25] plumbers yeah there there are some [1:35:28] complicating factors we've looked we've [1:35:29] looked into that as well of areas where [1:35:32] we can um invite um underutilized [1:35:36] businesses minority businesses [1:35:37] women-owned businesses um there will be [1:35:40] some specific State revolving fund [1:35:42] requirement loan requirements [1:35:45] potentially so we're just going to make [1:35:47] that very clear when we have the [1:35:48] contractor openhouse so anybody who can [1:35:50] meet those requirements of um certified [1:35:54] um payroll living wage Davis bacon able [1:35:57] to there there's a a few things that we [1:36:00] want to make sure that we consider if we [1:36:02] go down that path but we would be [1:36:04] welcoming to any small business to be [1:36:07] supporting that process well I'm just [1:36:10] thinking of the diversity equity and [1:36:12] inclusion part of bidding on contracts [1:36:17] when you have small businesses that are [1:36:18] in the area uh plumbers Etc that can do [1:36:21] this kind of work but don't have the [1:36:23] magnitude of a big contractor to be able [1:36:26] to bid on 110 different projects but my [1:36:29] other question is the rates the is the [1:36:34] payment for these Services part of the [1:36:37] rates that we are going to be [1:36:38] paying yes it's currently included in [1:36:41] our budget um and just one more thing [1:36:44] with the open house scheduled for the [1:36:46] October 11th we are including every [1:36:48] local plumber that we can get a contact [1:36:51] for so we're trying to connect General [1:36:54] Contractors with those plumbers so that [1:36:55] they can build those relationships and [1:36:57] have have those as subcontracting [1:36:59] opportunities okay so the small business [1:37:03] person or Plumbing would have to work [1:37:06] under a general contractor which is what [1:37:08] your preference is for awarding the [1:37:09] contract correct and we're we're open to [1:37:13] different teaming opportunities so if a [1:37:15] general contractor wants to have five [1:37:17] different local plumbers working for him [1:37:19] or if he wants to have one that's going [1:37:21] to be up to them for how they want to [1:37:22] manage what what their bid looks like [1:37:24] but we're looking into having a pretty [1:37:28] open dialogue with those contractors and [1:37:30] plumbers when they come here for a visit [1:37:32] so we can learn what type of solution [1:37:35] works [1:37:36] best please consider expanding what you [1:37:39] require them to do so that they can [1:37:41] actually work with some small business [1:37:43] people in the community absolutely yeah [1:37:45] or use some of the small business people [1:37:47] I would say as a previously working in [1:37:49] the contractor world there's a a [1:37:50] requirement that aasa has for soliciting [1:37:53] and reaching out to local underutilized [1:37:55] businesses minority companies and it's [1:37:57] not a it's a goal but it's also a [1:37:59] requirement to show where they did reach [1:38:01] out where they have solicited for [1:38:03] assistance on these projects well [1:38:05] whether they use them or not you can ask [1:38:07] but you still don't have to select a [1:38:09] requirement or something that they [1:38:10] actually have participation and the [1:38:12] state has verbiage in there that [1:38:14] requires that you to not like the very [1:38:16] first one is you can't dismiss somebody [1:38:19] because of you know any reason and why [1:38:21] you chose them and why you didn't chose [1:38:23] them so it's a it's a pretty robust [1:38:25] program that the state runs that aasa [1:38:27] aderes to okay thank [1:38:29] you [1:38:32] Kim I'm just wondering I don't know who [1:38:36] to ask or who would even know but if [1:38:38] there's any evidence on the flip side of [1:38:41] this issue are there doctors in the area [1:38:44] finding kids that seem to have lead [1:38:47] poisoning is that just a non-issue in [1:38:50] our area or if it was a non-issue if it [1:38:52] was an issue would we [1:38:56] know not specifically related exactly to [1:39:00] that question but one of the slides that [1:39:02] Mary had showed earlier was the whole [1:39:04] breadth of what the letting copper rule [1:39:06] revisions is trying to do and part of [1:39:07] that is school sampling and so that's [1:39:10] another piece of this that um could play [1:39:13] into that but we might not be privy to [1:39:17] all of those results at this [1:39:19] moment to Kim were you done [1:39:24] okay Todd so what is what is the legal [1:39:27] enforcement mechanism for the state on [1:39:32] aasa to have private lines like what if [1:39:36] people just don't or what if we like [1:39:39] oasa didn't pay for this we would be in [1:39:42] non-compliance with a regulatory [1:39:44] requirement so there could be fines or [1:39:46] there could be a notice of violations [1:39:49] fin because of private inaction [1:39:53] the state has not released guidance yet [1:39:55] on so I I I asked this because exactly [1:39:59] because I mean from my perspective aasa [1:40:01] has taken a hard stance against [1:40:05] connecting people to Wastewater even [1:40:07] though there are lots of people not [1:40:09] connected to Wastewater within the [1:40:11] service area and that has potentially [1:40:14] horrible impacts on the community and [1:40:16] like our water quality but for 110 [1:40:20] houses some of which may be incredibly [1:40:22] wealthy in able to pay themselves we're [1:40:26] gonna shell out like $1.3 million after [1:40:29] raising rates like three years in a row [1:40:32] so I think this this could be a very bad [1:40:34] look honestly down the road um if you [1:40:38] know especially now that like if word is [1:40:41] out hey aasa is going to pay for this [1:40:43] like none of these people are going to [1:40:44] pay for their [1:40:46] own to put some context in it we've been [1:40:50] having conversations with our neighbors [1:40:52] so Raleigh is paying for it Carrie is [1:40:54] paying for it uh General consensus this [1:40:56] is the only way that we will reach [1:40:58] compliance well you could turn them [1:41:01] off I mean I I just I I I can't imagine [1:41:07] how you [1:41:09] know how Utilities in Western Carolina [1:41:14] that have 80% leakage and are barely [1:41:18] able to you know be solvent are going to [1:41:21] do this [1:41:24] I guess I don't know there I don't know [1:41:26] if there's any insight into like the [1:41:28] [Laughter] [1:41:31] actual and I I spoke with some other [1:41:33] local Utilities in the area that are [1:41:35] they've had some of the conversations as [1:41:37] well like you just said what if we don't [1:41:39] and the states saying there will be [1:41:41] fines I don't think they've detailed [1:41:42] what they'll be right now but they're [1:41:44] going to Levy but there's also an [1:41:45] operational impact if people don't [1:41:48] comply with the work that happens when [1:41:50] there is a disturbance and um one more [1:41:52] question so I'm wondering like uh is [1:41:57] there notification like are any of these [1:41:59] rentals like is there notification given [1:42:02] to the renters rather than the owners [1:42:04] yes so we'll be communicating with the [1:42:06] property owners as well as the the [1:42:10] customer um so we'll you the person will [1:42:13] communicate with the billing address as [1:42:14] well as the service [1:42:18] address um Susanna and then Bruce and me [1:42:21] then I think we've got everybody [1:42:23] we done you will have hit all of us um [1:42:27] the uh I'm curious the machine learning [1:42:29] component of it that what happens when [1:42:31] you get to one of these that have been [1:42:33] identified as having uh the galvanized [1:42:38] pipes and then you discover that they [1:42:40] don't and is that how does that [1:42:42] information feedback loop take place so [1:42:46] part of the State's acceptance of our [1:42:48] machine learning methodology as well as [1:42:50] any other utilities machine learning [1:42:52] methodology is that after you have your [1:42:55] inventory and it's it's been accepted in [1:42:58] October when we submit it there'll be a [1:43:00] requirement to go and spot check um it's [1:43:02] based on the number of services in your [1:43:05] inventory so for us with 22,000 Services [1:43:09] the equivalent statistical number that [1:43:11] they're wanting us to spot check is [1:43:12] around that 300 mark so we're going to [1:43:14] have to go and spot check 300 areas that [1:43:17] were identified as [1:43:19] being either yes or no based on [1:43:23] predictive modeling and confirm that the [1:43:25] predictive modeling matches what we're [1:43:27] seeing in the field I will say there has [1:43:30] been no guidance yet supported from the [1:43:32] state about what happens if they don't [1:43:34] match so we are not sure what would [1:43:36] happen if that's the case because the [1:43:38] models 98% accurate based on the [1:43:42] statistical modeling that we've seen to [1:43:44] date so we're not sure what happens with [1:43:46] that 2% that might not be accurate right [1:43:48] the false positives and the false [1:43:50] negatives and exactly yep thank [1:43:54] you so we have um we have to start by [1:43:59] 2027 and we have to be done by 2037 [1:44:03] right if I recall that's the that's what [1:44:07] we estimate to be the Timeline under the [1:44:09] yeah the draft Rule and we have a ton of [1:44:12] stuff that we're doing over the next [1:44:15] three or four years with the past [1:44:18] filtration and the clear well and the [1:44:21] electrical distribution and then all the [1:44:23] regular CIP stuff and [1:44:27] um [1:44:29] all uh and I worry that we're taking on [1:44:32] too much too fast uh and not being [1:44:37] required to do it this quickly I [1:44:39] understand that there's operational [1:44:41] benefit to getting it done [1:44:44] quickly understand that but uh I just [1:44:47] worry that we we're taking on too much [1:44:50] stuff and there's a lot of unknowns that [1:44:53] will appear over time as we get into [1:44:55] these projects so is it is it wise to [1:44:59] commit to getting this done between 2025 [1:45:02] and 2027 rather than leaving it a little [1:45:05] further [1:45:07] open I think I want to respond to that [1:45:09] and a bit of what Todd you know the [1:45:12] concern about paying for these ourselves [1:45:16] and that yeah I think we have to take a [1:45:19] step back from this and think you know [1:45:21] what if there are what if there is [1:45:23] Led in these lines [1:45:28] y that is not healthy for those folks [1:45:31] that live in that house that's not the [1:45:33] level of service that aasa is expected [1:45:37] to provide um so there's a public health [1:45:40] concern there there's also now we've got [1:45:43] that line that's out there that's got [1:45:45] LED in it that's in service if there [1:45:48] were some kind of backflow event well [1:45:51] then the rest of the distribution [1:45:53] system get LED back in I think if you if [1:45:57] we look at it through that [1:45:59] lens these need need the these need to [1:46:01] come out of the ground okay that's the [1:46:03] effort that's across you know this this [1:46:05] all came out of the Flint Michigan U the [1:46:08] ble and that's the goal of this program [1:46:12] is you know we're very fortunate that we [1:46:14] only have 110 of these galvanized lines [1:46:17] that need to come out but there are [1:46:18] communities where maybe 50% of these are [1:46:23] are actually LED so I think if we if we [1:46:25] look at that through that lens then we [1:46:29] we need to as soon as possible address [1:46:31] this uh risk that's out there to uh [1:46:34] public health so I think if we look at [1:46:37] that and and we go address these right [1:46:40] away I think it's a sense of comfort for [1:46:43] the community we're maintaining the high [1:46:46] level of service that our customers are [1:46:48] used to and um you know we're we're U [1:46:52] ahead of the game so to speak with [1:46:55] you're not worried that we're taking on [1:46:56] too many projects at at once this [1:46:59] is when I look at it this is how I've [1:47:02] gotten comfortable with it when I look [1:47:04] at it from that perspective it jumps up [1:47:06] on priority okay so other things may get [1:47:09] delayed now yeah it's it's like I would [1:47:11] I would delay something else and do this [1:47:14] instead because at it it's it's that [1:47:16] that important okay it's also important [1:47:20] to understand this is not a program [1:47:23] was is undertaking [1:47:25] voluntarily not our idea hey why don't [1:47:27] we go out and check and see what which [1:47:30] of these we can find right the federal [1:47:32] government has said you will do this [1:47:34] right and you will do it on this [1:47:36] timeline those and the timelines that [1:47:38] were set out on the on the slides 27 and [1:47:42] 37 or 25 and 3 uh so these are federal [1:47:46] regulations that must be [1:47:51] met I thought somebody would ask so what [1:47:53] happens if you go to Joe Smith's house [1:47:56] and Joe Smith says get the hell off my [1:47:58] property well I have a Ser [1:48:02] questions yeah I I I would imagine that [1:48:05] that would be true for the public side [1:48:07] of for the Utility side but I can't [1:48:11] imagine there would be a federal that's [1:48:15] well how would that even be legally I [1:48:17] don't require you to imagine it but I do [1:48:19] require you to believe it because it is [1:48:21] true I mean the Federal government has [1:48:23] now mandated that a was make sure that [1:48:26] both sides of that service line both the [1:48:28] was side and the privately owned side [1:48:31] have no lid well it sounds then like [1:48:33] elmyra's solution is the one that gets [1:48:35] used at that point it's like if you're [1:48:37] not going to let us replace it and we're [1:48:38] shutting off your water well I I would I [1:48:42] think it's [1:48:43] premature uh to try to make that kind of [1:48:45] a determination today on the other hand [1:48:48] there may be other solutions that that [1:48:52] I will add one little piece to the [1:48:54] conversation [1:48:56] so the ru makers did have some foresight [1:48:59] into thinking that some people might [1:49:00] either not be responsive or not um [1:49:05] want yeah yeah exactly once someone [1:49:08] coming onto their property so the rule [1:49:11] has been written that you have to make [1:49:12] four attempts to communicate with each [1:49:15] customer that you're coming to do the [1:49:17] private side service replacement on they [1:49:19] have to be different types of [1:49:21] Communication phone email mailer [1:49:25] postcard whatever they have to meet a [1:49:27] certain criteria for the communication [1:49:29] to be listed as one of the four attempts [1:49:32] if after that they choose to still not [1:49:34] be responsive you would list them as [1:49:35] non-responsive but you would still have [1:49:37] to [1:49:38] notify uh we would still have to submit [1:49:41] an inventory with that being listed as [1:49:42] galvanized requirement replacement every [1:49:44] year in perpetuity and we would have to [1:49:46] comply with the regulations for any [1:49:47] disturbance notices going to that [1:49:49] particular resident if they chose not to [1:49:52] change their service line um in [1:49:55] perpetuity which can lead to operational [1:49:58] challenges I can imagine if a customer [1:50:02] had to pay for the uh construction on [1:50:06] their side of the [1:50:07] line they would be more inclined to say [1:50:10] stay off my property but one of the [1:50:12] reasons that uh aasa's undertaking the [1:50:16] cost to both sides of that line is to [1:50:19] make sure that that uh incentive is not [1:50:22] there that is why on Earth would [1:50:24] somebody say no i' even though you're [1:50:25] willing to fix it and pay it have it [1:50:28] fixed I'd rather have LD in my [1:50:31] children's drinking water you I just [1:50:33] don't think that's going to happen with [1:50:36] the sore frequency that we would be [1:50:38] concerned about and I'll tell you Marcus [1:50:41] will tell you there is quite a few [1:50:43] people in our community that don't want [1:50:44] you on their property and don't want you [1:50:46] to even inspect so that will be an issue [1:50:49] I'm [1:50:50] sure I I have uh three [1:50:53] questions um the first is uh we talked [1:50:57] about housing and it just the EP this [1:50:59] rule just might be houses but my kids go [1:51:01] to carbo Elementary which was built you [1:51:04] know in the 50s are we doing anything [1:51:06] about [1:51:10] schools are schools part of [1:51:13] this so schools is part of a later phase [1:51:17] in the Le copper Rule and and Provisions [1:51:23] be but there are there are current state [1:51:26] efforts that are testing school system [1:51:29] which actually is going to fulfill the [1:51:31] part of this rule requirement and we [1:51:34] like will my kids be in elementary [1:51:36] school or High [1:51:38] School service lines the service lines [1:51:41] to the school are part of this process [1:51:43] they're not excluded from that so [1:51:45] they're inspected and okay A lot of [1:51:47] times size takes place or you know is [1:51:50] are they prioritized because they have [1:51:53] kids in there the service line [1:51:56] Replacements yeah I mean that would be [1:51:59] part of the the process that we'll use [1:52:00] to prioritize this system yeah okay and [1:52:02] I will say that in Chapel Hill in carbo [1:52:06] we have done previous efforts of um [1:52:09] significant School sampling for lead [1:52:11] okay so that was my first question my [1:52:14] SEC second question was I think the map [1:52:16] that we showed is the existing service [1:52:18] area what about the potential extension [1:52:21] of the service area [1:52:23] um with the Wasa agreement and the [1:52:27] houses that are would be in that [1:52:30] area they well anything new we know will [1:52:33] be categorically non-led um but these [1:52:37] are like old houses [1:52:38] like if it if they're [1:52:41] as yeah those those houses that would be [1:52:45] added wouldn't have service lines right [1:52:46] now they'd be on whales and would have [1:52:48] to connect so they'd be they would use [1:52:50] up toate um new um infrastructure new [1:52:53] pipe they to their houses and they'd [1:52:55] have to connect that with today's [1:52:56] standards okay cool uh and then Bob [1:52:59] asked my third question so my fourth [1:53:01] question which is my last question and [1:53:03] hopefully the last question for the [1:53:04] group could we go back to the service [1:53:06] line slide of the picture yeah this that [1:53:08] one the one that yeah I I thought I was [1:53:12] operating under the assumption that [1:53:13] property owners were responsible from [1:53:15] the line from the house to the main no [1:53:17] so that's in the sewer service so oh oh [1:53:21] okay so actually in ours I don't know if [1:53:23] this has a pointer or not but um aasa [1:53:26] aasa stops at this part where it leaves [1:53:29] the meter Setter as our last goes from [1:53:31] here but on the sewer line it's from the [1:53:33] main to the house just wanted to clarify [1:53:35] that um thank [1:53:37] you anybody else or I I do for on those [1:53:41] service lines if we take the schools for [1:53:45] example to change those have you thought [1:53:48] or analyzed that the cost might be [1:53:50] higher on those cases [1:53:53] than a house cost uh have you taken [1:53:58] account into that yeah but and I just [1:54:01] explained a little bit about the school [1:54:02] a lot of the school's infrastructure is [1:54:04] because it's such a large water usage is [1:54:06] larger and those aren't typically pipes [1:54:08] that would be galvanized requiring [1:54:10] replacement or potentially LED in that [1:54:12] so that the cost would be higher and if [1:54:15] there is a university property or [1:54:17] something that is a 2 in it would be [1:54:19] more but I think that's averaged into [1:54:21] the um estimated cost of all of them now [1:54:24] a second question on this what happens [1:54:28] with private uh businesses are we going [1:54:31] to take care of them too or up to what [1:54:35] at what point we are going to say this [1:54:38] is you this is not no more of Wasa at [1:54:42] the expense of Wasa when do we have a [1:54:45] stopping point and correct me if I'm [1:54:48] wrong Alison but right now a customer is [1:54:49] a customer whether it's a commercial or [1:54:51] a residence [1:54:52] does UNC have a is you is UNCC part of [1:54:56] this [1:54:58] yes we talk a little bit about UNC and [1:55:01] how much they might be there are a [1:55:03] handful of galvaniz requiring [1:55:05] Replacements that are either on or [1:55:07] adjacent to UNCC properties so we have a [1:55:10] meeting coming up later this month to [1:55:11] talk with um UNC both their facilities [1:55:15] folks their Plumbing staff their right [1:55:18] of Entry team because we'll need to get [1:55:20] a right of Entry to to UNCC property in [1:55:23] the same way that we get right of Entry [1:55:25] to private property um and in addition [1:55:28] to UNCC as a stakeholder we're also [1:55:29] having conversations with um both towns [1:55:33] because we don't do plumbing inspections [1:55:34] but now we're going to have plumbing [1:55:36] inspections and permitting required as [1:55:38] part of that so we're trying to wrap our [1:55:40] arms around what the towns and the [1:55:42] university are all going to require in [1:55:44] terms of um planning permitting fees [1:55:48] inspection close out documentation all [1:55:51] these types of things and sometimes when [1:55:54] you do this kind of work it's much [1:55:56] harder than anticipated or you you [1:55:59] discover things that are you know you [1:56:01] didn't know and it it could become much [1:56:04] larger we are actively working on [1:56:07] talking to the utilities that have [1:56:09] already started their galvanized [1:56:10] requirement replacement or their lead [1:56:11] replacement plan to see what lessons [1:56:13] learned that they have and the [1:56:15] consultant that we're working with has [1:56:16] done this in a lot of of the [1:56:18] northeastern locations which granted [1:56:20] have a slightly different [1:56:23] um situation than we do you know homes [1:56:25] are built differently The Meters might [1:56:27] be in basements whereas meters here are [1:56:29] out on by the sidewalk typically so [1:56:31] we're trying to capitalize on all the [1:56:32] lessons learned that we possibly can and [1:56:34] make sure [1:56:35] that we keep our arms around what we can [1:56:38] actually do with compliance for this [1:56:41] okay great thank you all right I think [1:56:44] we're gonna WRA just okay go for a [1:56:48] concern when we get into the replacing [1:56:51] this service line [1:56:52] I'm just afraid that we might get into [1:56:54] an expense equal to the pasas once we [1:56:59] keep adding you know more more to change [1:57:03] and and if we go to the university and [1:57:06] if there is a lot to be changed at the [1:57:09] University those $10,000 we think for [1:57:13] unit or per [1:57:15] unit it's not going to be nothing [1:57:19] compared to the cost that he can be I [1:57:22] I'm just concerned of the amount of [1:57:25] money that it can be spent if we don't [1:57:28] be [1:57:31] careful I think we share some of those [1:57:33] concerns about what what we don't know [1:57:37] that that might exist out there and [1:57:39] that's unfortunately that that happens [1:57:42] with every project we do there's only so [1:57:44] much that can be determined in planning [1:57:48] and so usually we build in contingencies [1:57:50] and things like that to for those [1:57:52] unknowns um hopefully with the scale of [1:57:56] this being fairly small and working with [1:57:59] some experience folks and like Allison [1:58:02] said learning from uh others that have [1:58:06] done this we can avoid some of the the [1:58:09] you know bigger surprises that are out [1:58:12] there thank [1:58:14] you um thank you very much for answering [1:58:19] all of those questions um and for that [1:58:22] presentation and I'm looking forward to [1:58:24] the communication to the community and [1:58:25] if there are things that we can do um to [1:58:27] help please please let us know um it's [1:58:30] now time to review the board work [1:58:32] schedule are there any public [1:58:36] comments um are there any requests from [1:58:39] board members General Counsel or [1:58:41] staff no thanks okay um over to Todd to [1:58:45] review the rest of the [1:58:47] item yes um at the next at the October [1:58:51] meeting Mee we will be having our annual [1:58:53] meeting so Mar starn and Associates will [1:58:55] be here to go over the audit with you [1:58:58] all um we'll also be talking about the [1:59:01] scope of work for the rate study um [1:59:04] coming up then we added an item tonight [1:59:07] to that to kind of discuss this CIP risk [1:59:11] U impact as far as budgeting is [1:59:14] concerned um you also find the 12-month [1:59:18] calendar in your agendas our uh pending [1:59:21] St staff action items and the recurring [1:59:24] items for the next three to five years [1:59:26] I'd be happy to answer any questions [1:59:27] anybody has about [1:59:30] that does anybody have any [1:59:34] questions good on that um thank you very [1:59:38] much I'd be happy to summarize the items [1:59:41] I have you summarize tonight's meeting [1:59:44] um as I mentioned we will uh add the uh [1:59:47] CIP risk impact discussion to the [1:59:50] October board meeting agenda [1:59:52] at Bruce's suggestion we'll investigate [1:59:55] potential impacts to aasa from uncc's [1:59:58] proposed changes to the Coen Fuel and [2:00:02] get back to the board at at some some [2:00:04] future date uh we'll provide uh some [2:00:07] followup to the comments that were made [2:00:10] on the [2:00:11] de report uh I had protective service [2:00:14] worker definition we'll get you that [2:00:16] Michael um historical retention numbers [2:00:20] um and then we'll look at the uh kind of [2:00:23] the comps for gender diversity in the [2:00:26] our you know our known entities that we [2:00:29] can reach out to and find out about that [2:00:31] and then the last thing I had was I'll [2:00:33] update my work plan to reflect the [2:00:36] suggestions from [2:00:39] Bruce um I think that just about wraps [2:00:43] everything up so [2:00:46] uh Bob the meeting a journ thank you [2:00:53] all [2:00:55] right wanted to [2:01:03] check so the Republican [2:01:15] National is really bad [2:01:22] I