[0:00] be to hire an inspector that would work for the city during the summertime to [0:05] over to help oversee these construction projects make sure that our paperwork is [0:10] in order most of these projects are funded by state or our own funds so [0:17] therefore we don't have the federal requirements which are quite vulnerable [0:22] unded we almost need to have a consultant do it because there is so [0:27] much paperwork that has to be managed and they have the expertise to do that [0:31] we can follow state guidelines for most of our projects in weed our needs and [0:37] the requirements of our funding partners so what I've provided is a potential job [0:44] description for that position and if we can advertise that position and try and [0:52] get someone in here to help us out with that during the summer it would be [0:56] basically a will pay you there's no benefits other than you show [1:02] up you get your check it's you know you can pay them the same as we would be [1:09] paying our staff engineer and still be money ahead when you start looking at [1:15] the cost of these projects we will still need the consultant for some work we're [1:21] gonna have to survey state state the projects make sure they get done and [1:25] they have some expertise with the trail we've got a bridge that's going in so [1:30] there's a structural component to that [1:45] we have the inspector for six months and we're paying $10,000 a month [1:51] there's $60,000 well we have two two to two and a half million dollars worth of [2:01] construction at ten percent there's 250,000 so there's a huge savings right [2:06] there we start approaching 20% on those costs [2:10] and being you know considerably more but as I said we will use the consultant for [2:16] a few elements of the project to make sure that it is stinked properly so the [2:21] kind of tracker knows what they have to do and there's some special instructions [2:24] were going or special inspections that have to be done it will have to hire ray [2:29] and outside testing lab for some elements but again it's that's my hair [2:34] model the work the inspector would report to the e to myself or the city [2:46] engineer private company to do that if there's the liability it was the design [3:12] mistake yes there's the design year there's still a design nerves the [3:29] designers there you know responsibility to do that is being built to the [3:37] approved plans and specifications and there's something's lacking in those [3:43] plans and specifications it is the designers responsibility I mean we would [3:48] call them up and say there seems to be an issue here we need to get this [3:51] resolved but it's on them because there are multiple a lot of projects you don't [4:01] hired necessarily hire the design firm to do it you hire a separate firm [4:06] for that very purpose to sort of double-check with the designer has done [4:20] require to be bonded because waiting to go nowadays I'm not paranoid the [4:30] contractor would be bonded by the inspector should be bothered to share [4:34] the case marina I'm not quite this typically you you haven't necessarily [4:44] bonded an inspector I mean it's it's no different than when we ourselves to [4:53] inspection of projects that we've designed that is always a possibility [5:22] however the contract requires the contractor to still do it right so let's [5:29] say the project's all done and a month later you find mistakes the contractor [5:34] is still responsible because they were supposed to build to the plans and specs [5:55] and by having the inspector there in the field all the whole time that the [6:02] contractor is working I mean they may go back and forth between two projects but [6:07] they would be able to oversee that make sure that it is being followed [6:16] and there's a problem on what he's like a dog who's while it's still the [6:23] contractors responsibility to build it to the plants inspector even if he was [6:27] signed off on and they approve stuff or miss stuff and contractors done and [6:50] sometimes those mistakes aren't found for five ten years down the road [6:53] and now homeowners is trying to figure out you know who's responsible for this [6:56] mistake and it's never the inspector city's never responsible for not making [7:02] sure is built to the proper standard always fifteen years ago where someone [7:13] had a home built over Viking Harbor and the County inspector signed everything [7:20] long off and then while lately there was some significant problems with the house [7:25] the county was not responsible for that it was still the contractors [7:29] responsibility unfortunately in many cases like that the contractors already [7:34] filed bankruptcy because the laws for construction are you go after the [7:39] company but if they don't exist they don't exist and they'll file for [7:42] bankruptcy and start a new company the next day with a brand new name and [7:46] there's not much you can do about it [8:04] laughter the inspector and everybody the meantime the Congress went bankrupt so [8:10] we were just that's why we require two year bond [8:18] maintenance bond to sort of be able to find some if something not so we had two [8:33] interviews this afternoon you know I think we have a candidate that will be [8:39] making him off or to within the next day or so and as someone who has worked with [8:46] the city before working for a consulting firm and is gone went on from there and [8:51] worked the city of Renton for a while works for the FAA right now managing [8:58] construction projects Chuck has left the city he had an offer from the city of [9:17] Edgewood first significantly more money than he was getting hearing so he [9:23] elected to go there he does didn't want to play the game while I'm going to [9:27] trying you know leverage this one against this one they made him an offer [9:33] and it was an opportunity I thought he would take [9:48] um my projects to add a sheet that I used to give out the beginning of the [9:54] month is here it sort of tells you where we are with most of our projects I have [10:00] not updated from the beginning month I was prepared to do a couple of weeks ago [10:04] and something came along it did probably the one important thing in January he [10:15] has a Saturday retreat to talk about our strategic plan and we will have sort of [10:21] a schedule for you probably the next time that I come before you at the [10:26] committee of the whole but we do have the final report and so what I need to [10:30] do with that is is try and condense portions of it down to a couple of pages [10:35] but and the whole report will also be available for you to look at it you want [10:40] to look at the whole thing or The Reader's Digest version we have a [10:47] walkthrough for the reservoir and repair project tomorrow afternoon a three [10:52] Thursday afternoon at 3:00 we have a walk through for the sidewalk project at [10:59] four o'clock we have a walk through for the overlay project from third to [11:05] Ellingson will start will be March first is the current plan from the bid [11:14] openings of those two projects probably saw the plastic and signage on the [11:22] Senior Center the asbestos abatement contractor began their work yesterday [11:28] morning they should have that finished by the end of the week which means we [11:33] can roll the other country they're in starting next week I have no [11:58] idea [12:03] the level of the project that was being done at that time I think there's when [12:09] you have asbestos you've got a couple of different ways to treat it you can [12:13] encapsulate it if you put flooring over the top of it so that it it does not [12:19] become loose it's not a problem well you had a couple layers of flooring in [12:24] several spots in there so it was no longer an option to just put another [12:30] layer of flooring on top the plan was to go to a vinyl flooring you had carpet [12:35] throughout most that so you can't lay it over the top that just doesn't work so [12:39] because we were taking the carpet you know we were now down to the mastic [12:44] which is where the asbestos is and it's under the whole floor