1 00:00:00,000 --> 00:00:16,380 Everyone, it's about two or five. So I think we're going to go ahead and get started. For those of you that are online, we just ask that you put in the chat, your name and the organization that you are representing, just trying to get an account of who is in attendance today. 2 00:00:16,380 --> 00:00:22,940 My name is Victoria DiAngelo. I am the City of Pensacola CRA Division Manager. 3 00:00:23,680 --> 00:00:31,400 And we are here today to talk a little bit about the requests for letters of interest, solicitation that was put out recently. 4 00:00:32,540 --> 00:00:40,240 So we're going to start today just kind of going through a brief presentation kind of outlining all of the elements of the project. 5 00:00:40,240 --> 00:00:46,860 And we'll follow this by a site visit if you're interested, we'll go walk across the street and walk a little bit in the area. 6 00:00:47,240 --> 00:00:48,740 I'm going to take a look at the site. 7 00:00:52,360 --> 00:00:52,400 Fine. 8 00:00:59,620 --> 00:01:04,240 Okay, so a little bit on the purpose of the solicitation that we have here. 9 00:01:04,740 --> 00:01:10,440 This is called a request for letters of interest and you may have heard that in different ways in different cities. 10 00:01:10,980 --> 00:01:16,420 But the way that we're using it here is we're using it as a mechanism to gauge interest. 11 00:01:16,420 --> 00:01:40,540 And it also has a way to encourage partnership and collaboration, so it's intended to be a fairly informal process, so it's not a closed request for proposals where we can't talk, so we have open communication about ideas and information on the project, and so we just want to kind of clarify that. 12 00:01:40,540 --> 00:01:48,200 Now, when we get to the end of this process, you know, we're asking for letters of interest, we're asking for certain things within those letters of interest. 13 00:01:48,660 --> 00:01:52,120 But the goal is ultimately obviously to select a development partner. 14 00:01:52,660 --> 00:02:02,620 We could do that in a myriad of ways. It's kind of just going to depend what the response is as to whether or not we go to something more formal or if we go into direct negotiations. 15 00:02:11,450 --> 00:02:18,630 But just a little bit of information on 101 West Main Street, which is the principal site, the subject of the solicitation. 16 00:02:20,030 --> 00:02:26,290 So if you've looked at the site, you've noticed that there is an office building, a one-story office building located within the site. 17 00:02:27,310 --> 00:02:34,350 It is right next to the waterfront. It's pretty much right on the waterfront right next to Bayland Slip. 18 00:02:34,350 --> 00:02:48,790 You're one block away from Palifox Street, which you know is our busiest downtown street, and then another block in the other direction is the Blueahu stadium, which is kind of your other hub of entertainment downtown. 19 00:02:49,830 --> 00:02:57,250 It's about 0.62 acres, and we are looking at a long-term ground lease as the conveyance type for this parcel. 20 00:02:59,560 --> 00:03:00,080 Next slide. 21 00:03:05,490 --> 00:03:08,750 It's just briefly on the zoning and development. 22 00:03:08,930 --> 00:03:13,390 This is located within the South Palafox Business Street District. 23 00:03:13,870 --> 00:03:18,290 Within this district, you have by right maximum height of 80 feet. 24 00:03:18,290 --> 00:03:25,370 However, there was just approved a opportunity for a height bonus up to 150 feet. 25 00:03:26,290 --> 00:03:32,970 We did take a look at this around an area and we do want to be mindful of kind of the transitional nature of this site. 26 00:03:33,170 --> 00:03:37,790 So we do have you'll see within the ROI some preferred heights. 27 00:03:39,090 --> 00:03:42,590 With just the intention, like I said, to be kind of a transitional site. 28 00:03:44,120 --> 00:03:56,500 Your max density here is 108 units per acre which equates to about 67 units, however there are opportunities for various bonuses and transfers that could increase your density. 29 00:03:58,280 --> 00:04:03,360 You do not have any setbacks with the exception of compliance with fire safety codes. 30 00:04:06,500 --> 00:04:07,620 So 31 00:04:12,900 --> 00:04:19,220 the other part of this project that you might find interesting is that right next door, 32 00:04:19,420 --> 00:04:26,340 there are two adjacent sites, which we call the Harbor View sites, which has a six story, 33 00:04:26,460 --> 00:04:30,860 waterfront office building as well as a three story parking garage. 34 00:04:30,880 --> 00:04:36,780 Three story parking garage is directly next to the 101 West Main site. 35 00:04:37,940 --> 00:04:45,940 These sites, the city, does lease through a very long-term land lease to a private owner. 36 00:04:46,360 --> 00:04:48,580 And these sites are currently listed for sale. 37 00:04:48,860 --> 00:04:53,880 So if you have interest in these, there is the listing located within the RLOI, 38 00:04:54,120 --> 00:04:56,680 and that is the mechanism by which you should reach out. 39 00:04:58,340 --> 00:05:04,660 So these two sites, the parking garage site offers another .72 acres. 40 00:05:05,440 --> 00:05:08,680 office building is a 0.46 acres. 41 00:05:11,910 --> 00:05:12,550 Next slide. 42 00:05:20,750 --> 00:05:34,290 A little bit more on the zoning here. So the parking garage site same zoning as the 101 West main there exactly the same little bit larger site you could get 77 units here again eligible for bonuses and transfers. 43 00:05:35,250 --> 00:05:41,310 again we have some preferred heights on this site and then the office building is a different zoning 44 00:05:41,310 --> 00:05:46,730 districts. So for details on that you can refer to the section that's linked within within the 45 00:05:46,730 --> 00:05:51,470 document or you can reach out to the planning department. We do have representatives here today if you 46 00:05:51,470 --> 00:05:53,250 have questions about that. 47 00:05:55,260 --> 00:05:56,020 Next slide. 48 00:06:02,110 --> 00:06:05,370 I know the image for those here today. This is a little bit 49 00:06:05,370 --> 00:06:12,210 small on the screen. I wish it could be a little bit bigger for you. But what we're trying to show here 50 00:06:12,210 --> 00:06:21,030 is that there are a lot of amenities, a lot of planned amenities in this area. You've got really a 51 00:06:21,030 --> 00:06:34,850 cluster here. So, like I said, you're right down next to Bayland slip. And then as you go to the 52 00:06:35,630 --> 00:06:41,010 redevelopment parcels. There's a lot of activity kind of planned there. As you go to the south, 53 00:06:41,190 --> 00:06:48,770 you have Palphax Pier. The ferry landing site, Plaza de Luna, as you move east, obviously you're moving 54 00:06:48,770 --> 00:06:55,570 towards towards the beach. You would pass by the Port of Pensacola, which has a lot of exciting 55 00:06:55,570 --> 00:07:01,970 things going on right now on Monday. We just signed the lease with the American Magic. We have Erika 56 00:07:01,970 --> 00:07:07,410 here today who can talk to you a little bit about that if you're interested. And then pickleball 57 00:07:07,410 --> 00:07:16,770 courts coming. So a lot going on, most directly to this we have two, we have a pair of kind of 58 00:07:16,770 --> 00:07:23,250 waterfront trail segments that we have planned for this area. You know, some people have heard of this, 59 00:07:23,250 --> 00:07:28,410 some people have hence I just wanted to kind of call it out to you, but it's definitely a big part 60 00:07:28,410 --> 00:07:29,970 of this particular area. 61 00:07:30,000 --> 00:07:43,360 With Cedar Street being targeted right now under design for waterfront trail improvements, as well as Main Street as kind of your principal biking corridor. 62 00:07:44,680 --> 00:07:58,020 So that's intended to connect to Eastern West, long various amenities, various parks along the way and ultimately down all the way down to Pensacola Beach through the new Bridge Trail that was created. 63 00:07:59,300 --> 00:08:00,920 Next slide. 64 00:08:09,590 --> 00:08:16,670 So within the RLRI document, you'll see we go very deep into depth on a lot of these elements, 65 00:08:16,830 --> 00:08:20,870 but I tried to call out kind of the high level ones that we're looking for. 66 00:08:21,090 --> 00:08:27,950 So certainly on 101, we are looking for high density, residential, and warm mixed use. 67 00:08:28,830 --> 00:08:33,430 And what we're really looking for here is to create kind of a district in this area. 68 00:08:33,430 --> 00:08:36,390 This is an area that's kind of in the middle of everything 69 00:08:36,390 --> 00:08:37,990 that needs to be connected. 70 00:08:38,010 --> 00:08:40,450 It's a node along this path. 71 00:08:41,690 --> 00:08:43,210 So we're looking to and live in that 72 00:08:43,210 --> 00:08:46,490 and have this be something that generates activity downtown 73 00:08:47,770 --> 00:08:51,950 and visitation and all those elements that create a lively downtown. 74 00:08:52,990 --> 00:08:55,010 We want to create active streets. 75 00:08:55,390 --> 00:08:58,570 You'll see in the document, we're looking for ground floor 76 00:08:58,570 --> 00:09:02,990 activation along Main Street, potentially park, 77 00:09:02,990 --> 00:09:08,950 pocket parks, things like that that support the waterfront trail along Cedar. So creative ways to 78 00:09:08,950 --> 00:09:15,870 create areas for people and for people biking, walking, and just enjoying this general downtown 79 00:09:15,870 --> 00:09:22,010 area. Obviously, we're right along the waterfront. We'd like to link to the waterfront. So any 80 00:09:22,010 --> 00:09:29,250 features that help to create public access, public enjoyment of the waterfront, something that we're 81 00:09:30,510 --> 00:09:37,130 And then everyone loves to talk about parking so certainly parking is something that we know 82 00:09:37,130 --> 00:09:42,650 maybe a challenge on the site with the size and is obviously something that can be challenging 83 00:09:42,650 --> 00:09:50,190 downtown as well. So create a solution to that is something that's very desired as well. 84 00:09:50,530 --> 00:09:50,650 Fine. 85 00:09:57,520 --> 00:10:02,520 So just to go briefly into some of the submittal components, you know what we're really 86 00:10:02,520 --> 00:10:07,920 looking for here, we don't want to scare your way, but what we're really looking for here 87 00:10:07,920 --> 00:10:15,220 is to enable us through your letter of interest to understand the elements of the project 88 00:10:15,220 --> 00:10:20,960 as they relate to what we're asking for, the feasibility of the project, and also the timeline 89 00:10:20,960 --> 00:10:26,200 of the project. So when you look at the document, I'll give a lot more description into this, 90 00:10:26,380 --> 00:10:31,440 but those are the general items that we're looking for. Additionally, we really want you to give 91 00:10:31,440 --> 00:10:39,680 us feedback. Please don't be shy. Contact us beforehand. If there's something you feel we should know. 92 00:10:40,660 --> 00:10:50,940 You know, if you feel we have the timeline set right now to close on the 17th. If that is something that's going to be a challenge for you. We do want to we do want to know that. 93 00:10:51,220 --> 00:10:58,640 When you submit if there is something in this document that you feel that we need to be aware of please give us that feedback. 94 00:11:01,380 --> 00:11:02,160 Next slide. 95 00:11:10,550 --> 00:11:19,570 So, just a little bit of, on the timeline, so right now, you know, obviously the 29th February, we're doing the info conference, we'll do the site visit. 96 00:11:19,910 --> 00:11:27,430 We will be posting this recording to the website for anyone that has missed it today, wasn't able to attend. 97 00:11:28,170 --> 00:11:34,370 We're also going to target March 8 to try to put up some responses to questions that we're hearing. 98 00:11:34,370 --> 00:11:40,170 So that'll be posted to the website and currently close date is scheduled for March 17th. 99 00:11:41,030 --> 00:11:47,950 Like I said earlier, next steps will kind of be determined upon the kinds of responses that we get. 100 00:11:48,590 --> 00:11:54,930 Either way, however, we will notify you what the next steps are if you respond, we will let you know. 101 00:11:56,960 --> 00:11:57,480 Next slide. 102 00:12:05,940 --> 00:12:07,900 So we do want you to stay in touch. 103 00:12:08,420 --> 00:12:12,180 I do I can't stress enough, please register for notifications. 104 00:12:12,840 --> 00:12:17,680 You know, this will be the first of many development opportunities that are to come. 105 00:12:17,820 --> 00:12:23,300 This is kind of the first, first one we put out, but there are definitely going to be more going forward. 106 00:12:24,280 --> 00:12:29,680 So, the main way to register, you know, we are trying to keep record of who's reaching out to us 107 00:12:29,680 --> 00:12:37,120 and reaching back out, but the best way to do this is to register through these lists, the CRA project updates list, 108 00:12:37,120 --> 00:12:45,480 And the bid postings list through the notify me, and that'll give you text alerts and e-mail alerts when something goes out. 109 00:12:46,260 --> 00:12:55,920 And then of course check the website, and this is the e-mail address redevelopment at cityappensacola.com for any questions or to reach out to us. 110 00:12:57,330 --> 00:12:57,790 Why? 111 00:13:06,090 --> 00:13:12,270 Like I said, more development opportunities to come if affordable housing is something that you're interested in. 112 00:13:12,410 --> 00:13:20,390 We do have another opportunity down on West Servante Street that is out right now and that is on the website as well for more information on that. 113 00:13:21,470 --> 00:13:27,050 So right now I'm going to turn it over to Eric Liff, who is with Landbird Advisory. 114 00:13:27,230 --> 00:13:33,130 He's just going to give you a little bit of information kind of a snapshot on some of the market conditions around this project. 115 00:13:33,970 --> 00:13:41,030 Right. Thank you, Victoria. Again, my name is Eric Liff. I'm going to pull up a quick presentation 116 00:13:42,030 --> 00:13:52,360 if every just in front of. Can you see it? Yes. Okay. Okay. Again, I'm a principal of 117 00:13:52,360 --> 00:13:56,240 Lambda advisory. We are an economic development in real estate consulting firm and we're working 118 00:13:57,080 --> 00:14:02,300 with the City of Sierra on the one-on-one West Main Street development opportunity. I'm going 119 00:14:02,300 --> 00:14:10,760 to just again quickly highlight the opportunity and mostly in the context of the market and 120 00:14:10,760 --> 00:14:15,560 at a very high level, which I'm sure a lot of you know, what is going on, but I'm just going 121 00:14:15,560 --> 00:14:22,700 to kind of preview, you know, kind of some broader, broader stroke background information. 122 00:14:23,540 --> 00:14:26,880 You know, just as recently as last week, the Wall Street Journal, you know, came out with an 123 00:14:26,880 --> 00:14:31,520 article with a spotlight on, on Pensacola and highlighting, you know, the level of interest 124 00:14:31,520 --> 00:14:38,140 in investment in the region, post-pandemic, and it alludes to just to how robust the economy 125 00:14:38,140 --> 00:14:43,520 is and poised for future growth. It really is considered to be an emerging market. 126 00:14:44,520 --> 00:14:49,960 Specific to the the the the 101 West Main Street property is victory dimension. I mean, 127 00:14:50,320 --> 00:14:57,600 it's really envisioned to be a multifamily residential development really a singular use, 128 00:14:58,100 --> 00:14:59,980 But, you know, but for some some ground food. 129 00:15:00,000 --> 00:15:24,100 Or retail, but really that multi-family residential focus. However, and again, as Victoria stressed, you know, the redevelopment really expands with the inclusion of the Harborview office building and the parking structure. The Cedar Street properties. Obviously, this becomes a a larger and more evolved, involved planning and, you know, redevelopment exercise. 130 00:15:24,100 --> 00:15:30,480 But the fact is, collectively, this presents just a tremendous opportunity to develop a unique 131 00:15:30,480 --> 00:15:39,660 large scale mixed use redevelopment that contemplates residential, office, hotel, and some 132 00:15:39,660 --> 00:15:40,760 ground floor retail. 133 00:15:42,020 --> 00:15:48,000 So I'm going to just quickly touch upon really high level, some economic and market components. 134 00:15:48,000 --> 00:15:56,500 I mean, you know, the city, the city of Pensacola with its population of 55,000 is slightly less than 15% of the county. 135 00:15:56,600 --> 00:16:02,400 The household incomes in the city are fairly strong, particularly compared to the county, more than 10% higher than the county. 136 00:16:02,440 --> 00:16:05,700 And in Bogewell, obviously, for new housing development. 137 00:16:06,520 --> 00:16:17,040 And then mix of home ownership and rental housing within the city and broader region is fairly balanced and healthy and indicative of being able to accommodate new housing 138 00:16:17,040 --> 00:16:21,580 in particular, in this case rental, which we believe would be a strong opportunity. 139 00:16:25,080 --> 00:16:31,480 While the, you know, the growth, the population growth rate in the city was lower than 140 00:16:31,480 --> 00:16:34,980 that of the county in the past decade, it still was fairly stable. 141 00:16:35,200 --> 00:16:40,060 And what we did start to look at was the transportation, the regional transportation, 142 00:16:40,530 --> 00:16:45,560 and planning, the transportation planning organization, put out their forecasts for population 143 00:16:45,560 --> 00:16:51,580 on a region-wide basis, and for the county, it's projected to grow at about 0.5% per annum. 144 00:16:52,180 --> 00:16:58,000 And that, again, compared to historical, is a little bit lower, but still fairly steady. 145 00:16:58,500 --> 00:17:02,480 And the city should continue to capture its fair share of this growth and probably even 146 00:17:02,480 --> 00:17:08,640 more as the city continues to, you know, make these investments and encourage the joint 147 00:17:08,640 --> 00:17:12,080 developments that Victoria had been referring to. 148 00:17:12,080 --> 00:17:18,000 And I think there's one of the statistics that I thought was interesting in this high-level research. 149 00:17:18,060 --> 00:17:23,600 And that was the TPO's projections of employment for the region. 150 00:17:23,980 --> 00:17:30,740 And actually the employment is forecast to almost far outpace that of population. 151 00:17:31,060 --> 00:17:36,300 And I think that's a very important indication of the opportunity for economic development, 152 00:17:36,300 --> 00:17:41,940 especially, you know, it's that employment that really drives that that opportunity among 153 00:17:41,940 --> 00:17:49,680 everything, whether it's residential, office, professional business and tourism. So I think that 154 00:17:49,680 --> 00:17:55,880 again, both well from a broader economic standpoint, from this perspective. Talking about specific 155 00:17:55,880 --> 00:18:00,960 uses very quickly, I'll just go through starting with multi-family rental. There were nearly 156 00:18:00,960 --> 00:18:07,620 five hundred and fifty market rate units introduced to the to the greater down 157 00:18:07,620 --> 00:18:11,820 time area in the past few years. Rents within these developments are fairly 158 00:18:11,820 --> 00:18:16,640 strong pushing twenty one hundred dollars a unit per month and you know on a 159 00:18:16,640 --> 00:18:22,180 price per square foot basis of about two twenty plus per square foot. You know 160 00:18:22,180 --> 00:18:27,640 levels that start to support, you know, new quality luxury development and high 161 00:18:27,640 --> 00:18:34,340 intensity development, occupancies right now overall at 94 percent. But that includes the 162 00:18:34,340 --> 00:18:41,180 Palmea, which is still in its lease up stage at about 83 percent from what we can tell estimates. 163 00:18:41,460 --> 00:18:45,760 It's about it's absorbing about 12 to 15 units per month with this fairly, you know, fairly strong. 164 00:18:46,760 --> 00:18:53,960 And at that pace, you should see, it's a matter of time before occupancy is in the mid to upper 165 00:18:53,960 --> 00:18:59,280 upper 90% range, which is healthy and capable of absorbing new inventory. 166 00:19:00,520 --> 00:19:05,440 In terms of office, there's been about 320,000 square feet of office-based built in the 167 00:19:05,440 --> 00:19:08,540 greater downtown area in the last 10 years. 168 00:19:09,500 --> 00:19:17,320 While rates are fairly modest at the low $30 per square foot range full service, there is 169 00:19:17,320 --> 00:19:22,620 very limited space available, especially in quality offices, and that's just not in this 170 00:19:22,620 --> 00:19:28,800 we're seeing in several markets and it's that location and quality space that's attracting 171 00:19:28,800 --> 00:19:33,260 you know these new businesses and really performing well and I think in time you're going 172 00:19:33,260 --> 00:19:37,260 to see these rates really start to push up and start to be able to support again a new wave 173 00:19:37,260 --> 00:19:44,340 of office development. And then lastly is the hotel. The hotel market there's been two new hotels 174 00:19:44,340 --> 00:19:52,060 that have been added to the greater down to an area in the past six to seven years in terms of 175 00:19:52,060 --> 00:19:59,620 Robert daily rate ADR, they're pushing $150 average annual, which is considerably higher than 176 00:19:59,620 --> 00:20:05,220 it was pre-pandemic when it was in the low 20s, 120 range, and that's just, again, indicative 177 00:20:05,220 --> 00:20:12,140 of a market that just continues to show resilience number one and to support new development. 178 00:20:12,220 --> 00:20:16,320 And we're actually starting to see a lot of interest at least in the hotel within the downtown. 179 00:20:16,860 --> 00:20:22,040 And again, just a great opportunity from a mixed use standpoint to anchor projects such 180 00:20:22,040 --> 00:20:28,840 as this. And so with that, I'm going to turn it back over and I look forward to reviewing some 181 00:20:28,840 --> 00:20:36,450 of the responses. Thank you. Thank you, Eric. So at this time, we're going to close the presentation 182 00:20:36,450 --> 00:20:42,050 and we want to open it up to you, those in the room and anyone that might be here online for 183 00:20:42,050 --> 00:20:49,990 questions. For those online, I guess if you can we see if they raise their hands. Okay, I guess 184 00:20:49,990 --> 00:20:55,370 raise your hand if you'd like to speak online. So we'll open it up to those in the room first and then we'll 185 00:20:55,370 --> 00:20:58,110 we'll look online for questions online. 186 00:21:09,920 --> 00:21:12,140 Okay, it doesn't look like we have any questions in the room. So 187 00:21:12,140 --> 00:21:13,940 we're going to move online. 188 00:21:17,500 --> 00:21:21,480 Did I see Brian Spencer's hand up? It is. 189 00:21:24,800 --> 00:21:26,380 You're ready for my question and 190 00:21:26,380 --> 00:21:35,060 comment. We are ready. Thank you. Good presentation. Victoria, thank you very much. It's great to see 191 00:21:35,060 --> 00:21:39,960 of Pensacola presented so professionally, so thank you. 192 00:21:40,340 --> 00:21:43,340 Quick comment, you all have an incorrect location 193 00:21:43,340 --> 00:21:46,860 for the Marriott residents and on your map 194 00:21:46,860 --> 00:21:52,700 that's showing somewhere, well, it is very close, 195 00:21:53,000 --> 00:21:56,660 it's on the opposite side of East Chase Street 196 00:21:56,660 --> 00:21:58,400 from the Marriott Court yard. 197 00:22:00,700 --> 00:22:05,960 That's just a comment since this may be circulating to others. 198 00:22:07,560 --> 00:22:13,740 Okay, yep, we'll make sure, okay. Thank you. Thank you for that. And I'll just, well, we'll make sure that before the get circulated, that's just gets updated. 199 00:22:14,600 --> 00:22:29,960 Right. Thank you. Secondly, there is an amenity that you mentioned that I think is, isn't very powerful component that I hope is not aspirational. Could you comment on the... 200 00:22:30,000 --> 00:22:39,640 The district crossing that is shown across the railroad tracks leading into the port, which I'm 201 00:22:39,640 --> 00:22:46,320 a big proponent of, and I have experienced it in other cities in the U.S. as well as Europe. 202 00:22:46,860 --> 00:22:54,880 The close by example is New Orleans. As one is a pedestrian going down, say, canal or 203 00:22:54,880 --> 00:23:04,480 and then gets closer to the river and is able to enjoy a pedestrian experience along the river and you do cross river tracks. 204 00:23:05,380 --> 00:23:12,200 What are we going to be able to expect about the timeline of that? 205 00:23:12,600 --> 00:23:17,760 And is it a reality or are you all showing that is a, again, aspirational? 206 00:23:19,040 --> 00:23:23,860 I would not say that we can really say that it's aspirational. 207 00:23:25,020 --> 00:23:30,360 We're going to be going into re-looking at the design of the Cedar Street segment. 208 00:23:30,680 --> 00:23:35,680 So we will be going out for another solicitation to identify a design consultant that will 209 00:23:35,680 --> 00:23:37,140 again look at that segment. 210 00:23:37,440 --> 00:23:41,440 So obviously it's something that is a difficulty. 211 00:23:42,080 --> 00:23:44,340 There's definitely some challenges there. 212 00:23:44,340 --> 00:23:51,800 I know other cities, you know, obviously have worked through railroad challenges in a 213 00:23:51,800 --> 00:23:58,540 myriad of different ways. So we will be looking at it again, can't say definitively 214 00:23:58,540 --> 00:24:03,000 timeline at this point, but definitely it is something that we will be looking at again. 215 00:24:04,320 --> 00:24:10,610 All right. Thank you, Victoria. One other comment, we were the architects for the 216 00:24:10,610 --> 00:24:18,950 Pensacola Board of Realtors building 25 years ago adjacent to this site that you were presenting. 217 00:24:19,610 --> 00:24:34,490 So we have electronic surveys when we worked on that project. There were some parking arrangements that were negotiated with the Board of Realtors when they would need to use some of that parking. 218 00:24:34,490 --> 00:24:43,850 So we're going to need to look and see the duration of that parking agreement with the 219 00:24:43,850 --> 00:24:45,210 Board of Realtors. 220 00:24:45,370 --> 00:24:54,950 Secondly, our survey, Victoria, shows that the parcel is represented as a boundaries. 221 00:24:55,350 --> 00:25:00,530 The boundary lines actually extend out into the middle of Main Street. 222 00:25:00,530 --> 00:25:04,530 Can you offer commentary about that? 223 00:25:06,050 --> 00:25:22,530 Yeah, I'll speak first to the boundary lines. Now, we did recently amend the boundary lines donating that portion that was encroaching into the right away to public right away. So that's all being cleaned up and what you see in terms of the acreage reflects that change. 224 00:25:23,490 --> 00:25:27,470 I'll let Dina speak through the parking arrangements. 225 00:25:28,350 --> 00:25:31,810 And is the before we leave that survey discussion of the boundaries. 226 00:25:32,710 --> 00:25:41,730 So am I able to access the revised survey after the donation of the piece within the package? 227 00:25:42,370 --> 00:25:48,510 Yes. The survey is within the RLOI document. It should be the revised survey. 228 00:25:49,150 --> 00:25:50,810 All right. Thank you so much. 229 00:25:52,600 --> 00:25:54,960 Hey, Dean Stahlworth, property lease manager. 230 00:25:55,520 --> 00:25:58,460 In the termination of the lease with Pitzacola Sports Association 231 00:25:59,130 --> 00:26:02,160 to vacate the building, they did have an arrangement 232 00:26:02,160 --> 00:26:05,960 with the Pitzacola real estate office directly next door to it, 233 00:26:05,960 --> 00:26:07,100 or adjacent to it. 234 00:26:07,360 --> 00:26:09,740 That agreement was terminated with the lease. 235 00:26:10,840 --> 00:26:13,400 And when it communicating that to the park, 236 00:26:13,540 --> 00:26:16,580 they told the understand that they're parking may be impacted 237 00:26:16,580 --> 00:26:19,940 by whatever happens with the one-of-one 238 00:26:19,940 --> 00:26:20,960 with mainstream property. 239 00:26:20,960 --> 00:26:29,180 So it's all good. No one I'll put any restrictions on 101 West Main Street in the development of it in case anyone's interested in this day 240 00:26:30,900 --> 00:26:38,120 Thank you. That's that's valuable information since I was involved in that negotiation glad to hear that you were able to 241 00:26:38,120 --> 00:26:46,460 Sunset it so speak. Oh, yeah, thank you very much your involvement to us. I saw your name on some of the documents. Now. I was looking at the history. Oh, okay. Well 242 00:26:46,460 --> 00:26:51,640 I'm just going to say what I was trying to do when they lost their site to a fire is 243 00:26:51,640 --> 00:26:58,760 persuade them to stay in downtown Pensacola instead of move to Creighton Road, which was their number one choice. 244 00:27:00,790 --> 00:27:02,290 Excellent move for the city. 245 00:27:02,970 --> 00:27:04,730 Thank you so much. 246 00:27:10,790 --> 00:27:19,450 Fairification, density, that units, that was that known in Clayton replies strictly to dwelling units. 247 00:27:19,470 --> 00:27:20,290 Am I correct? 248 00:27:21,610 --> 00:27:22,950 That's correct, right? 249 00:27:23,070 --> 00:27:23,730 Let's see. 250 00:27:24,130 --> 00:27:25,130 Yes, that's correct. 251 00:27:25,830 --> 00:27:26,210 All right. 252 00:27:29,660 --> 00:27:33,840 And just for clarification, I know that we're, 253 00:27:34,180 --> 00:27:37,020 you mentioned mixed use and retail. 254 00:27:39,520 --> 00:27:46,640 We are subject to the minimum blood elevation for the ground floor, 255 00:27:46,960 --> 00:27:52,000 so I would say any habitable retail space needs 256 00:27:52,000 --> 00:27:56,400 to be approximately five feet above the current 257 00:27:56,400 --> 00:27:58,640 Main Street sidewalk level. 258 00:28:00,080 --> 00:28:02,600 And if you all want to say that's up to us 259 00:28:02,600 --> 00:28:04,600 to further confirm, that's fine, 260 00:28:05,160 --> 00:28:07,180 but I wouldn't mind if someone said 261 00:28:07,180 --> 00:28:08,920 you're approximately right. 262 00:28:11,720 --> 00:28:12,140 That 263 00:28:16,750 --> 00:28:18,990 sounds about right to me, 264 00:28:18,990 --> 00:28:20,670 but we'll definitely confirm that. 265 00:28:20,890 --> 00:28:23,470 Okay, all right, if you would add that, 266 00:28:23,910 --> 00:28:25,130 I appreciate it. 267 00:28:25,170 --> 00:28:28,030 I know there's been some discussion about 268 00:28:28,030 --> 00:28:57,930 When the city is adopting that, when it's enforcing it and the basically the threshold or the date that when permitting, when documents are received, which elevation that would be, be nice to know, and then also the, I want to say thanks for even giving all of us the heads up that the extension date may be 269 00:28:57,930 --> 00:29:02,010 extended, or I should say this submission date, be extended. 270 00:29:04,250 --> 00:29:10,050 Just a little piece of history, one of the advantages of being 66, as you've got now, 271 00:29:10,090 --> 00:29:13,070 I have 40 years of history of working with the CRA. 272 00:29:13,690 --> 00:29:23,130 I remember when Jennifer Fleming, who occupied your position, Victoria, issued an RFP for the development 273 00:29:23,130 --> 00:29:30,510 of Palafox Pier, which was a, basically, a parking lot for the municipal auditorium. 274 00:29:31,570 --> 00:29:38,930 But that RFP resulted in one respondent, one response, which was Ray Resonberger. 275 00:29:39,750 --> 00:29:46,130 That deadline stayed, it was a hard fix deadline, don't know if health fate may have 276 00:29:46,130 --> 00:29:48,210 been changed if that had been extended. 277 00:29:48,210 --> 00:29:59,970 But what is your decision going to be too extended, would it be because there's not enough respondents or... 278 00:30:00,000 --> 00:30:09,880 Or hearing feedback from us that immediately we were asking for a new day, or consideration for a new day. 279 00:30:10,480 --> 00:30:25,420 That'll ultimately be decided by the mayor's office as to whether or not to extend, but certainly I would submit in writing if there is an extension request until when you would be wanting to extend it until. 280 00:30:26,340 --> 00:30:28,700 All right. Thank you. 281 00:30:35,610 --> 00:30:37,230 Any other questions? 282 00:30:42,720 --> 00:30:49,460 Okay. Well, I want to thank everyone for coming today because we did say the site visit would be about three o'clock 283 00:30:49,460 --> 00:30:51,700 We will just kind of wait until then 284 00:30:52,540 --> 00:31:04,260 To do that so we could we can just anyone that's in the room that wants to do the site visit. We can just stay here and we'll just walk across the street maybe about five or ten minutes before three. 285 00:31:06,700 --> 00:31:07,380 Thank you everyone online 286 00:31:08,900 --> 00:31:09,780 Thank you. 287 00:31:09,840 --> 00:31:10,400 Nice to meet you. 288 00:31:10,620 --> 00:31:11,380 Thank you. 289 00:31:11,900 --> 00:31:12,680 Thank you Victoria.