[4:04] Yeah, I don't interact with the [4:06] development team much. [4:07] >> Okay, channel 17, please start [4:09] recording. [4:15] » Thank you. [4:17] >> Welcome. Welcome. this uh last week of [4:20] school to T-Mac. And I I say that [4:22] because I get to go straight home and [4:24] you know steal kids on and the first getting to summer vacation. Um [4:30] first we'd like to go around and [4:32] introduce everybody. My name is Beth [4:33] Province. I'm T-MAC Care. [4:37] >> I'm Noah Gordon, member of T-Mac. [4:39] >> I'm Ryan Kohler. Um [4:42] contingent member of T-Mac sort of [4:44] thing. [4:46] Uh, I'm Emma and I'm thinking about [4:49] joining. [4:50] That's why I'm here. [4:52] >> Ashley, public works [4:56] member. [4:58] >> David Keller [5:00] from Golding, Provo City Development [5:03] Services. And city development services [5:07] also proving [5:12] » Hey, Alan Shore Provo City Engineering. [5:14] >> Excellent. Okay, [5:17] >> online. [5:18] >> Oh, there's two online. Could you go [5:20] ahead and say your name? Oh, just one [5:22] online. [5:24] >> Everyone, I'm Joel Ta. I'm the planning [5:26] commission liaison. [5:28] >> Oh, awesome. Nice to meet you. Joel will [5:31] be replacing Lisa in August since we [5:34] don't meet in July and um we'll get him [5:38] nominated and paperwork sent to the [5:42] mayor's office and then they'll do the [5:44] advising consent of uh him becoming a [5:48] T-MAC member. So, he's joining us today [5:51] from that perspective. [5:52] >> Awesome. We look forward to seeing you [5:54] face to face. [5:57] Um, we just have one action item today [5:59] to approve minutes from the April [6:02] meeting. Uh, does anybody have any [6:04] corrections or anything they like to [6:05] make to the meeting notes? [6:09] >> Excellent. Is who who all would like to [6:14] those notes? [6:16] >> I would like to, but since I did review [6:18] them, I'm not going [6:19] >> I was not here for the meeting. I [6:24] » Thank you. And I I can second that, [6:26] right? [6:26] >> Yeah. [6:27] >> Perfect. I will second that. I'll [6:28] approve. Yay. [6:31] >> Okay. We only have one major item on the [6:34] agenda today, but it is a big and long [6:37] one. Um we asked Vern to go ahead and [6:39] pull a lot of numbers together about [6:42] east west connectivity throughout Provo. [6:45] And so we're going to hand it over to [6:47] Vern to start us off. [6:49] >> Okay. And I'll try to speak loud enough [6:52] over the maruchi band or mariachi band [6:54] next door. [6:56] >> Okay. U everybody remembers uh [7:02] see where the [7:05] There we go. [7:07] >> Um [7:09] east west connectivity was a discussion [7:13] topic and uh you guys asked me to put [7:15] together a lot of information and we [7:17] were able to do that. [7:19] um the transportation master plan. So, [7:21] we're going to talk about what each plan [7:24] so says and we're going to look at the [7:26] three plans and then we're going to kind [7:28] of look at a few other things um with [7:30] east west connectivity with uh level of [7:33] service and what corridors are east west [7:35] and what has been done and what yet [7:37] needs to be done accomplished. So, uh [7:41] the general plan these are all the [7:43] references made to east west [7:45] connectivity in the general plan. and [7:47] see improve east west traffic flow. Uh [7:50] look at signal timing to do reduce times [7:54] uh for east west travel. Uh center [7:57] street is the primary east west corridor [7:59] for the city. It is one of those. Uh 600 [8:02] south from Lake View Parkway to 1100 [8:04] west will provide east west mobility. [8:06] That's right out of a project uh [8:08] description. and then 3,700 north to the [8:11] east west connection uh across the north [8:14] end of the city connecting MU High [8:16] School, Edgemont Elementary [8:19] and it goes into Forum's 800 South uh [8:23] corridor to the west. So that was all [8:27] the references to the general plan. [8:29] Let's or to the um transportation master [8:32] plan. Let's look and see what was in the [8:34] general plan. [8:39] » Was there one at the bottom? [8:41] >> Yeah. Okay. When Let's see if I can make [8:44] this the right size here if I can. [8:52] » Right up here. [8:54] >> I got it. [8:56] >> See if that helps. One more maybe. [9:00] There we go. Okay. So, [9:03] uh, the last one was connection of 500 [9:06] north from 700 east to 900 east at 450. [9:09] So, that's been on our plan for 30 [9:11] years, built through the colony there, [9:14] connect 500 uh at 700 East, connect over [9:18] there to 900 East at 450 North. So, [9:22] that's an important east west [9:23] connectivity as well. Um, [9:32] Okay, let's go up this way. Uh, general [9:35] plan references [9:37] talks about I-15, the railroad tracks [9:40] and BRT actually being a little bit of a [9:43] barrier to east west traffic. um those [9:47] uh run through the city and I'm just you [9:50] know the the plan actually says Frontr [9:52] Runner and UVX but let me just say [9:55] railroad tracks BRT system and I-15 all [9:59] act as barriers uh to east west mobility [10:04] uh references bike walk and transit gaps [10:07] especially for east west connectivity [10:09] because of those barriers um east west [10:12] connectivity has been made especially [10:14] difficult by the train tracks [10:16] I-15 corridor and limited flow at the [10:18] few crossings and of course we're aware [10:20] of that. [10:22] Uh page 63 encourage connections to [10:25] increase east west mobility explore the [10:28] visibility of an active transportation [10:30] facility from east to west across I-15. [10:34] So that's what the general plan [10:35] references. [10:37] Let's go to the consery and resiliency [10:41] plan. East West references mentions [10:43] synchronization of traffic signals uh [10:46] could reduce idling and then streaming [10:49] streamlining bottlenecks at east west [10:52] connector. So looking at that as well. [10:54] So that's what's in our plan. We I think [10:58] the city and all our policies are very [11:00] much aware of east west connectivity and [11:03] the east west uh requirements. [11:07] So what has been done? [11:11] Uh major completed east west connections [11:14] Foothill Drive to 4800 North which leads [11:17] to uh Center Street in Orum. Uh that [11:21] particular arterial was completed in [11:23] 2007 [11:25] 500 west under I-15. Now, you're going [11:28] to say that's not an east west [11:29] connection, but what I'm bringing up [11:31] here is this is kind of a it runs north [11:34] and south, but it is east west [11:36] connectivity because it gets across the [11:38] interstate, right? [11:39] >> Crosses the major [11:40] >> crosses I-15. So, that was done in 2012. [11:44] Lake View Parkway to 500 West, that [11:46] arterial and connection uh to I-15 was [11:50] done in 2016, so fairly recent. And then [11:53] 2,000 north from Lake View Parkway was [11:56] done last year that connects to Geneva [11:59] Road which then connects under uh I-15 [12:02] and across the railroad tracks around [12:04] 2000 um north Provo 2000 South Orum [12:10] where it crosses the first set of [12:12] railroad tracks. You leave Provo, you go [12:14] into Oram. The second set of railroad [12:17] tracks is all the way into ORM. And of [12:19] course under I-15 and the roundabout at [12:21] Sand Hill Road is Warm. So when you [12:25] think about this for just a second, [12:29] our westiders [12:30] who live west of I-15 [12:34] really only had three connections that [12:37] were in Provo before these two were [12:40] done. That was Center Street, 920 and [12:45] South and 820 North. Those were the only [12:47] three connections. With the rebuild of [12:50] I-15, 500 West was able to get in. And [12:54] then Lake View Parkway, that road has [12:58] been uh completed now all the way [13:01] through. It's completed all the way [13:04] around. So, for whatever reason, uh, [13:08] looks like we're getting the second half [13:10] of our order here. So, feel free to go [13:13] and grab what you want. Um, [13:18] okay. So, let's talk about our major and [13:19] local street plan. What does it have on [13:21] it? And identify for future connections. [13:25] Well, the 1680 1730 north. I'm going to [13:29] try to show where this is at. Goes right [13:33] over here. So that would connect to [13:38] Geneva Road and go up and over or down [13:41] and under I-15 and connect 1730 at Sand [13:45] Hill Road on the other side east side of [13:47] I-15. So that's an arterial a minor [13:50] arterial that's planned to go over the [13:52] railroad. [13:54] >> So it has some engineering challenges [13:57] with the both sets of railroad tracks [13:59] being very close to I-15. Whether that [14:03] it it probably have to be a full bridge [14:05] structure all the way over all [14:07] >> you probably have to end Sand Hill Road [14:10] start bridge up at the top of the hill [14:13] without a doubt [14:15] it has some some challenges 1680 north [14:19] uh from Geneva Road to Lake View [14:21] Parkway. Uh this is a collector that is [14:23] in the Ivory Homes development called [14:26] Broadview Shores that will be connected [14:27] and completed as well. 500 north, 450 [14:31] north. We just talked about that from [14:33] 7th east to 9 east. Um when [14:36] redevelopment of the colony occurs, uh [14:39] we are looking at working with the [14:42] property owners that uh have some [14:44] commercial establishments there on night [14:47] that would connect to 450. [14:49] That would be a a a beneficial arterial [14:52] as well. Minor arterial 200 north uh [14:56] from 700 east to 750 east. Let me show [14:59] where that's at. It's a little hard, but [15:02] um what this does, it would get [15:06] um access to 800 East [15:11] um which would be great for bicyclists [15:13] along the 200 North corridor. It's a low [15:17] volume road. And uh I think you'll be [15:20] hearing from us more about 200 North [15:23] versus 300 North as a east west bikeway. [15:28] 560 south from Epic Lane to Lake View [15:31] Parkway. Now that extends right here and [15:34] you can see it where it would extend [15:37] from [15:39] uh currently I believe it's at what 1100 [15:43] maybe 1,600 [15:46] not at 2050 I don't think yet at the [15:48] road but it will extend [15:51] then um 1150 south uh from 1600 west to [15:56] Epic Lane that's down here uh we have [16:00] subdivisions that are already coming in [16:02] and showing some some type of [16:05] connectivity there. And then 1560 south [16:08] from 1100 west to 1600 west and [16:11] connecting that. So our transportation [16:13] master plan does show uh east west [16:16] connectivity for future collectors and [16:18] our [16:20] >> uh this may be the plan. [16:23] What's the status of the 900? [16:28] So tell me [16:29] >> we're gonna talk about that. We're going [16:30] to talk about that. Yeah. Okay. Let's move on to MAGS RTV. And this is [16:36] where we kind of get to talk about that. [16:38] So new major east west streets that have [16:41] been identified for future connection in [16:44] MAGS draft 2055 regional transportation [16:49] plan. We all had a really good [16:51] presentation from Bob Allen. Was that [16:53] January of this year or I don't know [16:55] when it was but we had a really good [16:57] presentation for MAG talked about the [16:59] regional transportation plan. Um well [17:03] the first one is 1680 to 1730. [17:07] Um that one is that one's still on [17:11] there. [17:12] >> How long has that one been on there? [17:15] >> A long time. I'd have to go back and [17:17] look at the two previous transportation [17:20] master plans, but it's been there I [17:21] think for the at least the previous one. [17:24] I don't know about the 2000, but it [17:27] certainly was for the 2013. [17:30] >> I had heard [17:32] that when freeway would be rebuilt for [17:36] the first Olympics [17:41] and there was many many drafts of things [17:43] to do just kind of swiveled at that [17:45] point. [17:46] Well, they had a whole collector [17:48] distributor system that went from about [17:49] Provo Center Street up to about 1730s, [17:54] you know, 1460 somewhere around there. [17:56] Um, but they selected design build [18:00] contractor and that all went out the [18:03] window. And what they were able to do is [18:06] convince the DOT that if we don't build [18:10] a collector distributor system, we can [18:12] widen the road all the way down the [18:14] Spanish Fork. That's what they did. [18:17] >> So they lost the collector distributor [18:20] system and the frontage roads a problem. [18:23] >> And that's not something [18:27] that [18:28] >> it's it's not being proposed in the new [18:31] R uh 2055 RTP. Let me just say it that [18:34] way. It's still an idea or concept out [18:37] there. [18:38] >> Um, [18:40] >> not like closing myself up. I'm cool. [18:42] >> Ryan, did you have any personal [18:45] knowledge of any personal knowledge, but [18:48] I do like the CD system that was there [18:50] and [18:52] I kind of I've heard a lot of things in [18:54] the industry that the design builder [18:56] that won the job definitely didn't do [18:58] any services to the local cities. [19:01] um that the alternative could have been [19:03] better for local development. [19:07] >> No, you're exactly right. And and I [19:10] think they really uh cater to the DOT and not [19:14] to the partnering cities and tax. Yeah, [19:18] >> I was [19:20] >> um we still talked about the 500 north. [19:22] We just talked about that. 700 East to [19:24] 900 East, that's in their plan. 900 [19:27] South, grade separation. This is this is [19:29] the one Craig that we're talking about. [19:33] Um goes from 350 East over to 7th east. [19:36] So basically [19:38] >> from the [19:41] >> Yeah, I would connect to State Street [19:42] over there. Come down by the cemetery. [19:45] Um and come down right before 350 here [19:48] by the Food and Care Coalition. [19:50] >> Hey, can we come back up? I know you [19:52] just talked about 500 north, but the one [19:54] above that is 500 north [19:57] over under the railroad track. [19:59] >> Uh 500 North uh to 620. U yeah, thank [20:04] you. I skipped that one. [20:06] >> This is completely new. This is not in [20:08] Provo's transportation master plan. Um [20:11] I'll show it to you in a little bit [20:12] here, but this um this is a strange one. [20:17] It would have to go up and over I-15, [20:20] two sets of railroad tracks, the Provo [20:22] River, and come in somewhere around [20:25] destroying Fort Utah Park. I I don't [20:29] know that people have thought that one [20:31] through. Um, it's [20:33] >> Fort [20:36] Utah. [20:38] >> Well, on the south side of the river, [20:39] >> it's on the south side of the river. [20:41] might come in right right on the north [20:43] side, but it kind of it hits 620, which [20:47] is [20:48] >> you would either have to go it would [20:50] you'd either have to take out like [20:52] >> a bunch of you could you could work the [20:54] bike trail, but you'd have to take out a [20:56] bunch of houses in that neighborhood [20:58] >> or [21:00] like build it over the river, which I [21:02] think would be [21:03] >> I think the first one came in the first [21:05] one came in right up for Utah Park. It [21:07] wasn't far enough north, so they [21:09] extended that to go up to 620. So when [21:12] this goes out for public comment, [21:16] >> uh you the when the RTP goes out for [21:19] public comment by MAG and it will be [21:21] toward uh the beginning of next year [21:24] around January. uh we need to certainly [21:27] get a recommendation from T-Mac and [21:30] you're individually as residents of [21:33] Provo you or Utah County you share [21:36] whatever you want with them lies a lot [21:39] of input okay [21:41] >> so I I'm gonna and this is speculation [21:44] but would this be something to [21:48] lay a foundation for a [21:52] » uh probably not right there. A little [21:55] too close to the [22:02] » but part of a CD system. [22:05] >> Yeah. If it were a CD system, a [22:07] collector distributor system, then that [22:09] could work. Yeah. [22:11] >> Okay. [22:12] >> But that's not being proposed on the [22:14] 2055 RTP. And then once and for all Utah [22:19] Lake crossing from Pelican Point to the [22:21] east side of Utah Lake. [22:23] It right now they're showing it anywhere [22:26] from 2000 North in Provo, Center Street [22:29] in Provo. Um if you haven't heard it, um [22:33] UD do is doing a major PEL study which [22:36] is planning the environmental linkage [22:38] study. They did meet with the [22:40] administration and me [22:43] earlier this week. um they six months [22:46] into the study it will take two and a [22:48] half years they have two years what I [22:52] think Provo's concerns were this as we [22:55] shared with the team [22:57] um I believe Avenue is doing that right [23:00] Ryan [23:00] >> Avenue is doing that yeah [23:02] >> so what we shared with Avenue [23:04] consultants UD do's selected contractor [23:06] for this was that [23:09] we want to know once and for all [23:12] is this feasible or not because if It's [23:15] not feasible. Then we need to plan 10 [23:17] other projects that will somehow provide [23:22] the access and the road widths and the [23:25] transit and everything else that goes [23:27] along with it. Otherwise, if you're just [23:30] putting all your money into one idea and [23:33] it doesn't ever happen, we got more [23:35] congestion in the valley. Okay. So, [23:38] that's kind of what we told them. [23:43] that bridge. [23:45] >> Sometimes the concepts are just studied [23:47] to see what would happen because you [23:48] don't know until you know like I'm doing [23:50] a con like a feasibility study to put a [23:53] cable stay structure over Lake Powell [23:55] right now $600 million to put a bridge [23:58] in the middle of nowhere [23:59] >> but we don't know if it's what it looks [24:02] like until we know what it looks like. [24:04] >> This this study will look at a whole [24:06] bunch of different alternatives. I mean, [24:08] they'll look at fairies, they'll look at [24:10] floating bridges, they'll look at spam [24:12] bridges, they'll look at causeways, [24:13] they'll look at, hey, we're going to [24:16] know once and for all in a couple years, [24:17] right? And that it either stays on the [24:19] plan or it disappears for good. At least [24:22] that's what I'm hoping. Okay. [24:25] So existing east west widening project [24:28] and magsdraft plan for two projects that [24:31] are still on there are 2200 north um [24:34] from Canyon Road to Stadium Avenue and [24:36] also the 820 North corridor from Geneva [24:39] Road to University Avenue. Those haven't [24:41] changed. Those are still on our plan and [24:43] they're still on the RTP's draft plan. [24:47] Okay. [24:52] Now we want to talk a little bit about [24:55] level of service. Uh it can refer to an [24:58] intersection or a corridor. What we're [25:01] going to talk about today is more [25:02] associated with the corridor level of [25:04] service by segment instead of an [25:08] intersection level of service. Um level [25:11] of service B is what we design and what [25:14] is acceptable in the state of Utah. [25:18] That's just what it is in urban areas. [25:22] In rural areas, [25:24] uh, they design and what's acceptable in [25:26] rural areas is level service C. It's a [25:29] little bit better level of service, but [25:30] they they have lesser population. They [25:33] actually have, um, per capita more [25:35] vehicle miles traveled in rural areas [25:37] because they have to travel longer [25:39] distances to school, to doctor's, [25:42] appointments, to those things. Um, [25:44] shopping even. Um so what we're going to [25:47] talk a little bit about today is the [25:49] level of service D for RPM peak hour [25:53] here based upon daily traffic volumes. [25:56] Uh capacity can roadway capacity can be [26:00] varies [26:02] by the number of lanes. It varies by the [26:04] number of driveways or the number of [26:06] public streets accessing it. Uh even [26:09] traffic signal spacing and timing [26:11] affects corridor level service. So you [26:15] can kind of see up there it's like a [26:17] report card right [26:19] >> you should not interpret it as a report [26:20] card the number one thing I teach [26:23] >> okay [26:23] >> it is not a card do not [26:26] >> so level of service C means you have the [26:29] least traffic delay level of service E [26:32] means you are using the the [26:34] infrastructure most efficiently you're [26:37] operating more services closer to their [26:39] capacity [26:40] >> and and I I think that's a really good [26:42] observation [26:44] Um, however, um, [26:47] that's why we designed to the level of [26:49] service D, okay? Is to maximize, [26:53] um, you you you don't want a roadway [26:55] that's 200 ft wide and eight lanes [26:57] across, right? Um, it's that no one's [27:01] going to be using it half the time. You [27:03] want to be efficient with the public's [27:05] money and you also going to breezy [27:09] expect to put up with some delay. No, [27:12] the the number one mistake that people [27:14] made when they developed level of [27:15] service is give it letter grades. Yeah, [27:17] >> it should not be interpreted as a report [27:19] card. We've known this for decades, but [27:21] it's so impossible not to look at that [27:23] and say A's are better than like they're [27:25] not, [27:26] >> right? And that's why I started off with the level service D and what we [27:31] designed for. But for a layman or lay [27:34] person, [27:36] you can look at it as a report card. [27:38] Okay. Again, I reject [27:41] you should not interpret it as a report [27:43] card. [27:44] >> It's tricky because everything has a [27:46] lifetime, right? So, you're shooting for [27:47] optimal lifetime utilization. So, when [27:50] you first build, it might be [27:51] underutilized. [27:52] >> That's right. [27:54] >> 20 years down the road, it might be [27:55] failing again. So, when you see things [27:58] built, it's not like we're building for [27:59] today. Usually, it's sometime in the [28:01] future. There's usually a target year [28:02] that we designed to. [28:04] >> I I think that's a really good point. [28:06] um you get a new road and you're going [28:08] to see just that on Lake View Parkway [28:10] when I get down to it, right? You're [28:12] going to see this new facility and [28:13] you're going to say, "No one's using [28:15] it." It's not the case necessarily, but [28:18] uh okay, I'm going to try to blow this [28:20] up just a little bit so you can see the [28:22] numbers here. [28:24] Um let's start off with 4800 North and [28:27] Foothill Drive. So, this is Foothill [28:30] Drive coming down off the mountain. Uh [28:32] this is one of the roads that we got [28:34] built here and connected next to 4,800 [28:37] north. Um these are segments. So each [28:40] segment that you see here, we were able [28:42] to pull up the volume and the percentage [28:47] of that capacity being utilized for [28:50] level of service D. It's not the [28:52] physical capacity of the road. So it's [28:55] not level of service C like you would [28:56] find on a a rural area, but it's level [29:00] of service D. So when we look at this [29:03] 21,000 vehicles between this segment and [29:06] this segment, we're looking at about 64, [29:09] if I'm reading that correctly, 64% uh [29:12] capacity of a level of service D. So [29:15] there's, you know, it might be busy, but [29:18] it's it's not not uh not that busy, [29:23] right? [29:23] >> Yeah. You could add you could add 10,000 [29:26] cars per day to it and it would still be [29:28] level service. [29:30] So, this next segment 14,000, you see [29:33] it's at 42%. [29:35] Now, remember how I talked about lane [29:37] sizes and lane widths or not lane widths [29:40] necessarily, but lane number of lanes. [29:42] Um, it does drop down here and so I have [29:45] to use a different calculation to [29:47] calculate these roadway segments. So, [29:51] this newer road that we built a few [29:53] years back is about 30% capacity for a [29:57] level service D. It's got 5,400 vehicles [30:01] that use it on a daily basis. Um, [30:05] this segment 3,300. So, it drops down at [30:08] 18% and then it climbs a little bit [30:10] 3,500 vehicles per day on Foothill. [30:15] So, we're going to go through each one [30:16] of these east west because that's what I [30:19] was requested to provide information. [30:21] >> Thank you. [30:22] >> And then you guys get to uh certainly do [30:25] some discussion here for the rest of the [30:27] day. Let me zoom in on this one. Okay. [30:29] 3700 North. Uh I believe this connects [30:33] to 8 South in Orum [30:34] >> and this goes by [30:37] >> and yeah, it hits Temp High School and [30:39] Edgemont [30:40] Elementary School. Um Will's Pit Stop is [30:44] here to orient you. Uh so we're about [30:47] 83% on this segment. Um, we have a major [30:51] safety problem right here and we're [30:52] going to be doing something at Edgewood [30:54] Drive in the next year or less if we [30:58] can. Um, but we are Dave's already [31:03] designed a draft for us and we're going [31:04] to look at improving the safety of that [31:07] intersection. This segment's about 89%. [31:11] So, what happens is is there's a lot of [31:14] vehicles that use this segment here. [31:16] you're at 60%, you drop down to 60% [31:19] here. And then, you know, Quell Valley, [31:23] you know, it's just not that busy. [31:27] Let's go down to the next one. [31:29] University Parkway. Now, you're asking, [31:32] is that a north south road or east west? [31:34] It is east west. [31:35] >> It's it's it's the diagonal, [31:37] >> right? It's the diagonal. The old [31:39] diagonal as we called it. Um, so now [31:42] when I show this up here at 103%, [31:45] that means it's 103% of level of service [31:48] D capacity, which means it really is a [31:52] level of service E. Everybody's been [31:54] there, right? [31:56] Get down here a little bit better. Um, [31:59] 75%, [32:00] 88%, it gets busier. Uh, where we at [32:04] here? 90%. [32:06] Um, Voden, what's this number? 61. Okay. [32:10] And so 92 if I remember correctly over [32:12] here by the stadium and then uh what's [32:15] that 63 [32:18] so that is that is Parkway and um [32:22] there are some very busy park parts of [32:25] Parkway and the further west you get the [32:27] worse it is right everybody's been up to [32:31] or [32:34] 2230 north uh this connects to [32:37] University Parkway and to our 9 east. Uh [32:40] we're at 65% between this segment here, [32:44] 67% between University Avenue and Canyon [32:47] Road at 111%. [32:50] Uh now I wanted to tell you the two [32:54] numbers here. This is a number that's [32:57] extrapolated using U dot numbers. This [33:00] is U dot numbers. When you see an [33:02] asterisk, that is Provo City's actual [33:05] counts. Okay? So they're off by 2,000 [33:08] here because I counted this in January [33:11] at 17,000 and it's probably a little low [33:14] because that time of year seasonal [33:16] fluctuation. Um but when you look at [33:19] that uh during PMP peak hour it's [33:22] certainly over level of service D and [33:25] we're into E. [33:27] As you pull around here on 9 east you're [33:30] going to see traffic increase. The drop [33:33] off is at Temp View or Tempview Drive. [33:37] I lost my mouse. And that's around 85% [33:40] along 9 east. So, it's a busy facility. [33:45] Everybody knows it's busy facility. Um, [33:48] and it's only getting [33:51] busy now. Didn't you do something last [33:54] summer? Didn't you do some traffic [33:56] counts on there last summer on 19? [33:57] >> We did. Yeah, we did some traffic counts [33:59] on 9 east over by the church building [34:00] south of University. [34:01] >> Okay. [34:03] >> We didn't analyze this at all. If you [34:04] want the data, I can share it. [34:06] >> Yeah, I'd love love love to see that. [34:07] >> I mean, it was it was kind of an [34:08] interesting time because it was when [34:10] that stretch of 900 East was closed. [34:13] >> Uh was the stretch between the the MTC [34:17] and the and the temple was was shut. [34:19] >> Oh, yeah. [34:20] >> So, volumes may have been lower. [34:23] >> Yeah. [34:27] » Temple reopens, what do you expect these [34:30] volumes to increase by? I don't know how [34:33] much they're going to increase, but I [34:36] know I'm going to have to do a signal [34:37] warrant analysis on North Temple and 9 [34:40] East. [34:42] I've already promised that to the [34:43] neighborhood. [34:44] So, and I won't do it in house. That one [34:47] I'll actually hire a consultant to do [34:49] because [34:51] I want to make sure everybody's [34:53] trustworthy. A little tricky though [34:55] because the old temple district [35:06] uh 820 north. Uh let's look at the [35:08] volumes there. Uh I'm going to make this [35:11] just a little bit bigger so I can see [35:12] it. Okay, so this segment, please note [35:16] that this segment's only a couple lanes. [35:19] And so when I say it's 86% of level [35:22] service D capacity and then it drops [35:24] down here to 37, that's because we get [35:27] to three lanes here. Uh we get over here [35:30] west, I'm sorry, east of uh State [35:33] Street, it goes back up to 89%. [35:36] And then what we're looking 70 there uh [35:40] west of uh between Freedom and and [35:45] University Avenue and then 64% [35:49] east of uh University Avenue. [35:52] >> What what methodology did you use to [35:53] determine the level of service? [35:56] Um I you [35:57] >> not not the level of service but the the capacity uh for the because yeah [36:02] there's no turn lane on that section of [36:03] 820 north but there also no driveways to [36:05] turn left into. So it's strange that [36:07] your level of service capacity would be [36:09] so sensitive to that. [36:11] >> It's sensitive to lanes and it's [36:13] sensitive to the spacing of traffic [36:15] signals. So it's either less than or [36:18] greater than half mile segments. And I [36:21] can show you what I use. I use UD do [36:24] approved [36:25] um [36:27] uh level of service capacities for CDME. [36:31] Uh that's what I use. Okay. So is that based on high capacity manual [36:35] methodology or [36:36] >> Yeah. Highway capacity methodology for [36:39] urban, suburban and rural areas. I this [36:42] is urban area. So [36:43] >> when were these numbers? [36:46] >> These are Thank you. 2024. [36:49] So they're a couple years old. [36:52] This combination of and [36:55] >> this is AAD. So this is daily traffic [36:58] volumes. [37:00] >> The level service will fluctuate during [37:02] the day. [37:04] >> I guess as I'm seeing all the numbers, [37:06] I'm really curious each section has [37:08] different volumes and where are they [37:10] going from? [37:12] Well, in this case, it's it's not a [37:14] difference in the there's some [37:15] difference in the volume, but mostly the [37:17] difference between the 86% and the 37% [37:20] is you're using a different inputs to [37:22] this level of service formula. So, it's [37:24] not that the volume is changing by that [37:26] much. It's that the data the design data [37:29] makes the level of service the the [37:32] capacity at which you reach level of [37:34] service be much higher. [37:39] And there are a number of reasons [37:40] vehicles crammed together there on the west side. You've got the Freedom [37:43] Academy there, the Liberty, whatever. [37:45] There's a lot of vehicles stack up when [37:48] those kids are getting in and out. [37:49] You've got the railroad crossing there. [37:51] A lot of people going to, you know, the [37:53] high school or something, get to sit [37:54] there and wait for a train or they're [37:56] coming back, get to sit there and wait [37:57] for the trains. There just a lot of [37:59] reasons people jam up near the freeway. [38:02] That's right. the level of service [38:03] decapacity [38:05] >> the level of service decapacity over by [38:07] the freeway is like 11,000 [38:10] uh but then you drop 3,000 because of [38:12] all the freedom prep provoc [38:14] onto gramby right so the volume goes [38:16] down by by 3,000 but the level of [38:18] service D volume jumps up to 16,000 in [38:21] that segment [38:23] >> because of the extra space and the nose [38:25] traffic signals and the turn lane and [38:27] all those other things. So that's [38:30] >> when it goes past 500 [38:36] » the volume goes up. [38:38] >> Yeah. Yeah. Well, that's why. [38:40] >> And also be aware of the length of the [38:41] segments. Um so this is a pretty small [38:44] segment from Independence over to Geneva [38:46] Road. This is a much larger segment from [38:48] Independence all the way over to 500. [38:55] Okay. Which one is this one? This one is [38:58] 500 North. So you can see 500 North. Um [39:03] it's got a lot of capacity still [39:05] remaining at it. It's been busy, [39:08] very very busy because it's been our [39:10] detour route for the bridge being out at [39:13] 820. So that doesn't reflect today's [39:17] numbers. Okay, this is 2024 numbers. As [39:21] you get closer, I think everybody [39:23] realizes how important 500 North is to [39:25] Provo City. [39:27] And um you get over here by the by the [39:31] rec center and you're going to see [39:33] higher capacity. We are replacing that [39:35] signal there this year. Um and then when [39:39] you get um east of that University [39:42] Avenue [39:44] number was 11,000. Okay. I didn't [39:48] believe it and I still don't believe it. [39:50] And so we had numbers where we just did [39:53] a Khan did a new traffic signal at [39:56] northeast and 500 north and this was our [39:59] traffic volume counts. Okay. [40:01] >> Well, you should use UDA's numbers when [40:03] you're doing signal war analysis. You [40:05] should do pro. [40:10] » So anyway, this this show's a little [40:12] off, right? I mean that's that's pretty [40:15] far off. [40:15] >> Well, they probably measured it right at [40:16] the library. Yeah, they could have these [40:19] segments, you know, they measure the [40:21] whole segment. So, you're right. They [40:22] could have measured it right at the [40:24] library. [40:25] Okay, let's go to the next one. This is [40:28] 200. Um, I don't believe this either. [40:31] Uh, a thousand vehicles on uh on 200 [40:35] North. If that's the case, best kept [40:38] secret in Provo for East West Mobility [40:41] is 200 North. [40:42] >> I go 200 all the time. [40:45] And let's just keep that secret. Yeah, [40:47] keep that secret [40:49] meeting. [40:53] » Let's look at 200 north. [40:56] >> Yeah, I have seen the difference [40:58] >> especially with BRT. [41:01] >> Yeah, [41:02] >> you've seen an increase in traffic. [41:05] >> Tremendous. [41:05] >> Because David lives right on 200. He [41:07] fronts 200 north on the south side. [41:10] So if we are cutting off [41:13] >> Yeah, there's that's about the only you [41:15] can cross university at [41:19] >> center, first north, second north, fifth [41:22] north [41:24] and what is it? Seven store [41:30] » third and fourth third fourth and sixth. [41:36] » Okay. Center street will go again from [41:38] west to east. Uh we got out here Lake [41:41] View Parkway. Actually it's Lakeshore [41:43] Drive is this segment out to the harbor. Um 15% it's all [41:51] concerns there. When people say how busy [41:54] Center Street is, it is very, very busy. [41:57] Um, we look at 5100. We just did some, [42:01] we just added bike lanes and uh this [42:04] section was just uh re completely [42:06] reconstructed. [42:08] So, um, David was able to uh get us bike [42:13] lanes on the south side. We had them on [42:15] the north side, just didn't have room on [42:17] the south side. Future development is [42:19] going to push that where we'll get curb [42:20] and gutter soon. [42:23] Okay, moving over here. This is an [42:26] interesting thing. Um, UD do said they [42:29] had 18,000 vehicles, which is 275% [42:33] of a level service D, which means it's [42:35] pretty much failing. Okay, during PMP, [42:39] um, our counts are a little bit [42:41] different. Um, [42:45] » had 28,000. [42:46] >> 28,000. [42:47] >> Oh, it's 28,000. Thank you. My eyes are [42:49] bad. 185 I believe. Now the reason for the [42:55] two different ones there is I calculated [43:01] this one out at its current two-lane [43:04] configuration. It will be restriped this [43:07] summer to a three-lane facility. You got [43:10] once that apartment complex is built [43:12] that will be striped from 1600 west to [43:15] Geneva Road to a three-lane facility and [43:18] then it's still 137% capacity of a level [43:23] service D. Okay, it will improve [43:27] but it's still going to be a level [43:28] service [43:28] >> without the department going in. So, [43:32] >> okay. uh 109% [43:35] uh I don't think this surprises anybody [43:37] that we have 36,000 vehicles coming off [43:40] of uh I-15 on Center Street. Uh a lot of [43:44] them turn, but some continue center [43:48] street itself. It's a little peculiar. I [43:51] did calculate this out at four lanes. Um [43:54] there are four lanes. They're very [43:55] small, nine nine and a half foot width [43:57] lanes, but uh we do have a lot of [44:00] traffic signals. So that's at 75% [44:03] capacity with 18,000. [44:06] My I hadn't gone out there and counted. [44:09] We haven't done our data there, but I [44:11] suspect we're closer to 20,000 on that [44:15] segment. Drops down to 11,000 when you [44:18] get east. And then there's a little [44:20] segment here between 9th and [44:24] 1080 or something like that. [44:25] >> Seventh and nth. [44:26] >> Seventh and ninth. Thank you. It is [44:28] seventh and ninth. 64 and then I get [44:31] down to 39 when I guess east of 9 east. [44:35] Um what we learned was the state [44:38] hospital produces a lot more trips than [44:40] we thought. [44:43] Obviously not by patients but by support [44:45] staff and [44:47] all the the freight deliveries that need [44:49] to be there to support the population [44:51] that's there. Plus six Grisby Golf. [44:57] It draws people from everywhere. [44:59] >> Really? [45:00] >> Every once in a while you get to go to [45:02] the castle. [45:03] >> What was that? [45:04] >> The castle. [45:04] >> Oh yes. [45:05] >> What are your What are your October? [45:07] >> Are they still doing the haunted castle? [45:11] >> I remember doing that years ago. I [45:13] didn't know they still have it. Okay, [45:16] let's let's go down and talk Lake View [45:19] Parkway for just a second. This is a new [45:22] facility, right? This is exactly what [45:24] Ryan was kind of talking about. Uh [45:26] there's excess capacity built to [45:28] accommodate capacity up to the design [45:30] year. David, do you remember the design [45:32] year? 2045 or 2050? I think it was 2050 [45:36] was the design year on this one. So, UD [45:39] do says we only have a thousand vehicles [45:41] and that's only 3% for a level service [45:44] D. Um I've done some counts out there. [45:47] We actually have around 2,600 vehicles a [45:49] day and it's getting busier. It's [45:51] growing [45:52] >> well and people realize that it's [45:54] connecting like I know soon as 2000 [45:57] connected through to the parkway that's [45:59] how I drive home every day from work the [46:02] volume has gone up on 2000 [46:08] » and then [46:08] >> and it connects [46:11] >> this segment west I'm sorry east of [46:13] University Avenue is one big segment [46:15] that they did. It's 14,000 approaching [46:18] 60% capacity on on Lake View Parkway. So [46:23] now this is where I get to turn it back [46:25] to you guys for discussion and I get to [46:28] enjoy not talking. [46:31] >> I I'm going to have you scroll through. [46:33] >> Okay. [46:34] >> Can you go to the Center Street? [46:37] >> Which one? [46:37] >> The Center Street. [46:39] >> Yep. [46:40] I am very yeah that one [46:45] to me that's actually extremely [46:47] concerning [46:49] the fact that we are still over capacity [46:52] in both areas coming off [46:57] >> well let me just say that it is a state [46:59] route state route 114 [47:02] we have been working tirelessly for the [47:04] last several years trying to get Geneva [47:07] Road and that segment on Center Street [47:10] built that's supposed to go to five [47:12] lanes and then the Geneva Road supposed [47:14] to be a three l full three-lane [47:16] cross-section sidewalk curb and gutter [47:18] and and shoulders on the east side [47:22] curve gutter and a trail and shoulders [47:24] on the west side. [47:26] >> That was my my next question because I [47:28] know Geneva Road State Road and I know [47:30] 500 West. [47:33] So that once it crosses over and hits [47:36] 500, does it stop being a state road and [47:38] go down to 300? [47:40] >> It's a state road all the way up to [47:42] State Street. So State Street to 2050 [47:45] West. Now years ago, this used to be a [47:48] state road all the way to the state [47:49] hospital. And all the reds on that are [47:52] state [48:01] » and I know this is more of a northwest [48:03] connection not not north south not east [48:08] west but I feel like it's probably going [48:10] to impact it. They have plans to take [48:13] Geneva all the way to Lake. So we yeah [48:16] it's in our transportation master plan [48:18] to connect 2050 west down to Lake View [48:21] Parkway. Yes. [48:24] My biggest concern in this area is [48:28] all the development is going to happen [48:29] here in Southwest Provo and then how [48:31] does that traffic get on the northbound [48:33] I-15? I hate the northbound access at [48:35] University Avenue interchange. I don't [48:37] really airport too much here. this is [48:40] where everybody's going to go [48:42] >> and this traffic, you know, as that [48:45] fills out, this is just going to get [48:46] worse and worse for the interchange. [48:50] >> Well, that's why the parkway, [48:54] correct me if I'm wrong, or was [48:56] basically told to finish the parkway up [49:00] connected to Geneva Road right below or [49:02] tel so that they have access to [49:05] >> New York Avenue interchange, which also [49:07] isn't great. Yes. Well, I I understand, [49:10] but it's a connection towards towards [49:11] the freeway. Um, that's [49:16] » Is there still a a new interchange in [49:19] Provo on the plan? [49:21] >> It is currently on the RTP and it's a [49:24] draft on the future draft of the RTP at [49:28] 820. [49:28] >> They'd have to do an environmental [49:29] impact statement. [49:34] I think the idea is putting [49:36] a freeway interchange somewhere around [49:38] 800. [49:40] >> I know that's in the plan. Like part of [49:42] the reason I'm here, I told this [49:43] committee rejected that last year. U had [49:46] aotted $3 million for that environmental [49:48] study and Provo turned them down. [49:50] uh the mayor turned them down because [49:54] I don't think this committee ever talked [49:55] about I don't know like I wasn't [49:57] >> we had probably at least half if not [50:02] somewhere around half of that funding [50:03] already I was on the original team the [50:06] private sector side that did partial [50:09] that study um it didn't move forward [50:13] with the environmental I think it's just [50:17] a personal opinion I think once UD do is [50:19] done with their PEL study and catch your [50:21] breath. [50:22] >> Got to do the same thing for 8:20 and [50:25] make a final decision on that someday, [50:27] right? I'm not [50:29] >> It would be the commute lane. We have [50:32] the commuters for BYU and IHC that are [50:34] our biggest employers. It would be a [50:36] direct commute for them to get all those [50:38] commuters to get out of University [50:40] Parkway. And [50:42] >> except BYU has no parking. [50:45] There's nowhere for the traffic to go [50:47] on. [50:49] because it goes at the bottom side of [50:52] right through all of the [50:56] >> building. What was that? [51:02] » There's there's the there's the bank [51:04] parking lot right next to Canyon Road [51:06] and Old Provo High. That's a good size [51:09] lot. [51:10] >> Yeah. [51:10] Um [51:12] >> that may still be there. They have [51:14] >> BYU is is contemplating charging faculty [51:18] and staff for parking [51:20] in an effort to reduce truck driving to [51:22] campus. So [51:26] >> is is there any Well, okay. I'm [51:28] >> think BYU has thousands of parking [51:30] spaces every day that go unused. They're [51:32] all in university. [51:37] » A lot of lot of capacity by the stadium [51:39] for parking. But I have seen that fill [51:42] up considerably over the years. Um, [51:45] that's a thing that BYU kind of says to [51:48] the city. Don't worry about parking. [51:50] Whenever they build a new building, [51:51] don't worry about parking because we got [51:53] plenty of it. Well, you do have plenty [51:55] of it, just maybe not in the locations [51:57] where it's needed. [51:59] >> So, for Center Street, this is all [52:02] mostly all of this is state. So, we [52:05] really can't do much about it. No, [52:09] that's not true. We It's on the RTP. [52:13] It's on our plan as well. And we are [52:17] really been pushing hard for Geneva Road [52:19] and Center Street to get fixed. [52:21] >> So, we do when we do state projects. I [52:23] primarily work for UDOT projects. We [52:26] generally have to follow whatever the [52:28] local municipally master plan is. We [52:30] can't just do whatever we want. The [52:32] master plan for the city says there's a [52:34] trail here. We put the trail in on the [52:36] UD do property to make [52:38] So if it's not on the city's master [52:40] plan, then we do what's best for you do [52:42] generally. [52:44] >> So if this is sitting from you do [52:47] perspective, this is sitting at 275% [52:50] capacity. [52:54] » Yeah. The 28,275 [52:57] capacity. Would they consider expanding [52:59] center shoot? [53:01] >> Yeah. And I' I've shared this [53:03] information with them. When I found out [53:06] I was looking at the traffic study for [53:07] the apartment complex and I said, "Guys, [53:11] we got a safety problem on Center Street [53:13] between 16 between the interchange and [53:16] 2050." And I showed them this. They're [53:18] aware of it. [53:20] >> It's also important to note though that [53:23] thing that's actually going to govern [53:24] the design of these roads in these tight [53:26] urban areas is the intersection level [53:28] service, which is a different [53:30] methodology. like the the center street [53:33] to fifth west is a intersection design [53:36] problem not a segment problem like the [53:39] volumes are over 100% but the the [53:41] intersection design level service is the [53:44] thing you need to look at and even if [53:45] you make [53:46] >> talking about the freeway exchange or [53:47] just [53:48] >> no I'm talking about center street over [53:49] to fist uh west that giant left turn [53:52] lane that backs up two blocks every day [53:54] uh that's an intersection issue not a [53:55] road segment issue and even if you make [53:58] Geneva road seven lane for if you make [54:01] Geneva seven lanes, you make Center [54:02] Street seven lanes west of the freeway, [54:04] the signals at the interchange can't [54:06] handle the additional volumes. [54:08] >> So, one thought that [54:12] couple of us had several years ago was [54:14] why since Provo City Center [54:18] drops the the speed and is really making [54:21] that more of a pedestrian bike friendly [54:24] area, which I'm I'm not opposed to at [54:25] all. Why not push traffic up to that's a [54:29] 35 mile an hour road? Is there a way to [54:31] design it that way? I think that would [54:34] help with that situation because like [54:36] you said, a lot of people go 500 west. [54:39] They we still have 75% capacity in the [54:43] downtown area, but it's more about that [54:46] like you said, the interchange between [54:47] Center Street. [54:49] >> Yeah, we're certainly encouraging First [54:51] North. Um it is a 35 mph road having a [54:55] little faster speed 35 over 15. We think [54:59] there would be a little bit better [55:00] attraction. [55:02] Um but um we we haven't seen a huge [55:05] change. Uh what's going to change that [55:08] eventually is going to have to be design [55:12] and that's [55:15] but that that's all I'm going to say. [55:17] It's already acting at a very core level [55:21] intersection level of service at the 500 [55:24] West and I'm [55:27] working with UD do now where six west [55:30] may not be a through street much longer [55:33] they experience raised median there we [55:36] don't get people turning left there [55:38] anyway maybe two for peak hour I don't [55:42] even know how they can do it during peak [55:44] hour safety hazard when they safety [55:46] hazard and they do it. So, we're [55:50] >> like 3700 North right before the signal [55:53] there. We got a problem. And same thing [55:55] with this one only. This is truly you do [55:57] DOT's problem, but we're going to work [55:58] with them. [56:00] >> I I guess if I were to if I had all the [56:03] money in the world and impacted nobody [56:06] on a personal level, I would say reroute [56:09] center street to go up to First North [56:11] and have the major intersection be at [56:12] First North. [56:16] Well, there you get east west problems [56:18] too because first north ends at the old [56:24] it doesn't go all the way [56:27] >> and you have a res like there are four [56:29] there are five blocks of it where it's [56:31] effectively an arterial but every other [56:33] part of it is a residential street [56:36] >> at least turns [56:38] >> so that's if we're talking about if [56:40] we're talking about because if you got [56:42] 36,000 coming from the freeway to fifth [56:44] north but you only have 18,000 [56:46] Half of that traffic is going north and [56:49] south on [56:49] >> That's right. [56:51] >> So, why not make it easier to go north [56:53] and south on Sith? [56:54] >> There was a discussion a couple years [56:55] ago, Vern, I think you were around for [56:57] this about the city acquiring that [56:59] grocery store and building a big S-curve [57:01] into Center Street, right? And so then [57:03] it would dump people off on first. The [57:05] problem is where people really want to [57:07] go is northbound off State Street. You [57:09] still have a huge left turn problem. [57:12] What would be sweet in my mind is if you [57:14] did one frontage couplet, center street [57:16] would be eastbound, first north would be [57:19] westbound. They come together near the [57:20] interchange. We do see that all the time [57:22] and all the cities that have done that [57:24] have tried to walk away from it because [57:26] it's really bad for like local [57:29] pedestrians. [57:32] » A lot of cities did that in the 70s and [57:35] every city that did it is trying to undo [57:37] it now. One one way roads just have more [57:39] efficient intersections like for traffic [57:41] movement if you ignore everything else. [57:44] Sorry. But it becomes a car sewer and [57:47] all the businesses die. [57:49] >> Yeah. Ignore everything else. You move a [57:52] lot of cars through but no one wants to [57:55] be around. [57:57] >> Which one's better for the actress? [58:00] >> Yeah. On the old east side. [58:04] I I think what's archaic, even though [58:06] it's new, is both of our interchanges. [58:10] Both of them are [58:13] peculiar in nature. They're not any [58:15] standardized intersection interchange on [58:18] the entire I-15. I8 is the worst [58:21] designed interchange in the state. Like [58:24] it's a death trap. It has terrible [58:26] operational efficiency. Um the people [58:29] who designed it should be ashamed. [58:32] >> Well, it's not what I understand. So I [58:35] was told that Provo forced that onto UD [58:37] dot that Provo had a better design. [58:39] People here complained it would turn [58:40] into a raceway with what UD do wanted to [58:42] do. So they put this in. [58:43] >> Well, there's also an issue where the design that uh would be most [58:47] efficient would have required closing [58:50] that interchange for a year. [58:53] Um because they they had to build the [58:55] new interchange [58:57] like they had to build the new [58:58] interchange where the old one wasn't and [59:00] they wanted to keep Center Street open [59:02] across I-15 in the freeway during the [59:05] construction. Uh and so that means that meant they had to move it down and [59:09] that's why you get this weird displaced [59:11] design. The the way to do it correctly [59:14] would would have been to tear it down, [59:16] close the whole road for a year and then [59:18] open up a welldesigned energy. That was [59:21] rejected. [59:22] Okay. Can we send these? Yeah, [59:26] >> I'll I'll get I'll send the PDF out to [59:30] everybody. I'll make sure that gets done [59:32] and uh I also like [59:34] >> you guys can look at it and I think you [59:37] guys could discuss more next meeting in [59:39] June and I won't have to present in [59:41] June. Um you guys could just any other [59:45] items you want on the agenda other than [59:47] east west connectivity. I think it's [59:49] healthy discussion and I I know right [59:51] now uh intuitively uh some of the [59:54] engineers in the room have been looking [59:57] at this and discussing things and and [1:00:00] even engineers have difference of [1:00:02] opinions right so um I think it's [1:00:06] healthy discussion [1:00:08] but let's our our plans do have [1:00:13] you know remedies for this we we are [1:00:15] planning east west connectivity [1:00:18] there's just only so much money and a [1:00:20] lot of this is development driven where [1:00:22] we just don't go out and build the road [1:00:24] ourselves. Sometimes we do like like [1:00:26] View Parkway, but um rarely does that [1:00:29] often occur. [1:00:32] >> So this is my encouragement to T-Mac [1:00:34] members. Um [1:00:36] he's going to send these out. Go through [1:00:38] them if you can if you have time. [1:00:43] did two or three highlights kind of want [1:00:45] to bring up because for me the first [1:00:46] things that highlighted to me was center [1:00:48] street also the [1:00:51] around the temple those are kind of the [1:00:53] two big highlights to me through these [1:00:56] things but go through looking through [1:00:57] look at your highlights we don't have [1:00:59] much on the agenda for next month so we [1:01:02] can just go through these slides one by [1:01:04] one if we want to um yeah and I think [1:01:10] this is going to be a very interesting [1:01:11] discussion [1:01:13] Yeah. [1:01:13] >> Yes. [1:01:13] >> I I do have a suggestion for a followup [1:01:16] item for [1:01:18] >> not too far in the future. [1:01:19] >> Okay. [1:01:20] >> And that was last May we heard from the [1:01:23] BYU students and faculty about the near [1:01:26] misses by [1:01:29] and near misses with [1:01:33] cars. And the in that discussion, I [1:01:37] remember talking about people trying to [1:01:40] report near misses [1:01:43] and and and people trying to report [1:01:49] bicycle related incidents with cars and [1:01:53] the system for doing that was not very [1:01:56] functional and I remember some [1:01:58] discussion about that. I don't know what [1:02:00] the police department I I remember [1:02:04] something vaguely about that, but [1:02:07] >> I have a follow up on that. The police [1:02:09] did hear that. They did make a change to [1:02:11] make it easier reporting a non vehicular [1:02:14] accident. Um but they're they are not [1:02:18] counting near misses. No way to report a [1:02:21] near miss. [1:02:23] Okay. Now there is software out there [1:02:26] and camera systems that do that. Um [1:02:31] we have not invested in those systems. [1:02:36] Would we have to build a data center to [1:02:39] have enough? [1:02:47] » Okay. Um really quick. I know we're like [1:02:50] right almost at time, but uh Davis, [1:02:52] could you just give us a real brief [1:02:54] update on 820? [1:02:56] >> So, [1:02:57] we are on schedule. We're plann to open [1:02:59] up July 4th um for the road. [1:03:03] Uh the trail will remain closed for a [1:03:07] number of weeks after that as we are [1:03:08] getting a mural painted and the artist [1:03:11] has requested kind of clean conditions [1:03:13] and that can't happen really during [1:03:15] construction. So, we're kind of doing it [1:03:17] a two-phase opening, but the road will [1:03:19] be opened um scheduled by the 4th of [1:03:22] July. [1:03:22] >> Yay. [1:03:23] >> So, we can I can you can just get [1:03:25] through these, but this is just kind of [1:03:27] some updates. We've done some back [1:03:29] filling. We've poured the deck. Um you [1:03:32] can just see as we go through, but we've [1:03:34] made a lot of progress in the last [1:03:35] month, and this next month, you'll see [1:03:37] uh just as much progress here as we [1:03:39] close out this project. So, [1:03:41] >> it's all the visual progress. Mhm. T [1:03:44] going to be lighted. [1:03:46] >> H will the tunnel be lighted? [1:03:47] >> Yes. [1:03:51] » Oh yeah. [1:03:53] >> Er, do we have much on the University [1:03:55] Avenue bridge replacement? [1:03:56] >> Uh, yeah, we have a couple of things. [1:03:58] Uh, I don't know if I reported last [1:04:00] month we were boring. We ran into an [1:04:03] object. Um, started to go up a little [1:04:06] bit. Um, they submitted a revised plan [1:04:10] of the railroad. the railroad turned [1:04:12] that one down. Surprise. Um, and then [1:04:15] just a couple of things associated with [1:04:17] that project. We're restriping, we've [1:04:20] been, not us, but the contractors been [1:04:22] restriping Lake View Parkway and and the [1:04:26] State Street intersection all week. [1:04:28] Sorry for the delays. Uh, but that's going to be so much better. [1:04:34] You'll see it. It's just a a much better [1:04:37] striping. and you won't see lines going [1:04:40] everywhere. Which way? Also, just be [1:04:43] prepared in the month of June. [1:04:47] I don't even want to say this. Um, the [1:04:50] southbound [1:04:52] onramp to I-15 is going to be shut down [1:04:54] at University Avenue. So, what you'll do [1:05:00] instead of making that [1:05:01] >> to southbound I5 or southbound to [1:05:03] northbound I5? [1:05:04] >> Southbound. Southbound. Southbound [1:05:07] University Avenue to southbound I-15. [1:05:09] Okay. So, you'll go to the traffic [1:05:12] light. You'll make a right and then [1:05:14] you'll make a left onto the ramp and [1:05:17] that's going to be down for a month [1:05:19] while they do pour new concrete on the [1:05:22] slip ramp. Uh that's the little hook [1:05:24] ramp going northbound. [1:05:25] >> Oh, man. [1:05:26] >> So, just be aware [1:05:31] of that. [1:05:32] >> Has been like blasted out there. Joseph [1:05:36] will be in charge of that. Joseph [1:05:37] sitting back here [1:05:40] will work together that out. [1:05:46] » Well, good thing [1:05:48] we husband doesn't have to say that [1:05:49] anymore. [1:05:50] >> Okay. H Did you have anything? [1:05:51] >> Uh we can discuss it next month. [1:05:53] >> Next month. We're good. Okay. [1:05:56] >> Okay. [1:05:58] >> Go go go over. Thank you. Go over the [1:06:00] slides. See what you guys want to talk [1:06:02] about next month. And next month it's [1:06:03] June 11th [1:06:05] since we moved it up a week for [1:06:09] >> June. Did we decide we're not going to [1:06:11] meet in July? [1:06:12] >> So we're not meeting in July and [1:06:13] December. [1:06:14] >> We will meet in [1:06:16] >> Thank you. [1:06:17] >> Are you doing August? [1:06:18] >> Yeah. I'll have my students come and do [1:06:21] some stuff that we've been working on. [1:06:26] » Good to see you. [1:06:27] >> Yeah. That's