1 00:03:30,540 --> 00:03:35,580 I'd like to call to order the August 12th meeting of the Rally Planning Commission. My name is 2 00:03:35,580 --> 00:03:39,880 Nicole Bennett, and I have the honor of serving as chair of the commission. I want to thank 3 00:03:39,880 --> 00:03:44,620 my fellow commissioners for your trust. I'd like to welcome members of the public, city 4 00:03:44,620 --> 00:03:49,820 staff, and those joining us virtually. Our work here is about building a rally that reflects 5 00:03:49,820 --> 00:03:54,360 the needs, values, and hopes of all of our residents and that work deserves our best 6 00:03:54,360 --> 00:04:00,140 focus and respect. A few quick reminders as we get started. Commissioners, please wait 7 00:04:00,140 --> 00:04:05,880 to be recognized by the Chair before speaking. We will treat applicants, staff, the public 8 00:04:05,880 --> 00:04:10,900 and each other with courtesy at all times. Healthy debate is welcome and differences 9 00:04:10,900 --> 00:04:17,480 of opinion are part of the process, but let's keep our discussions on topic, constructive 10 00:04:18,100 --> 00:04:24,360 and as my former pastor used to say, decent and in order. We each bring passion and 11 00:04:24,360 --> 00:04:29,240 perspective to this table. My commitment as Chair is to make sure that energy moves 12 00:04:29,240 --> 00:04:34,420 us forward to an informed recommendation for City Council. With that, let's get started. 13 00:04:35,500 --> 00:04:40,060 We begin each meeting with an opportunity for members of the public to comment on items 14 00:04:40,060 --> 00:04:44,580 not on the agenda. Is there anyone here this morning who would like to comment on an item 15 00:04:44,580 --> 00:04:45,520 not on the agenda? 16 00:04:47,930 --> 00:04:51,690 Seeing none, we'll move into the agenda. First, we have the consent 17 00:04:51,690 --> 00:04:57,270 agenda, which includes approval of the June 24th meeting minutes. Does anyone have 18 00:04:57,270 --> 00:04:58,550 any comments on the minutes? 19 00:05:02,540 --> 00:05:06,640 I would just know there's a paper copy on the table for you. The attachment and the agenda 20 00:05:07,640 --> 00:05:12,720 was in a draft form and so it may be helpful for you to look at the paper copy on the table. 21 00:05:13,000 --> 00:05:13,260 Do 22 00:05:27,140 --> 00:05:31,860 you want to have any, I know it's a quick review, but any comments on the minutes? 23 00:05:33,540 --> 00:05:38,440 If not, I will entertain a motion. So moved. Motion to approve the minutes. 24 00:05:39,120 --> 00:05:40,200 Do I have a second? Second. 25 00:05:40,200 --> 00:05:44,120 have a motion on the second all in favor it's 26 00:05:49,440 --> 00:05:51,040 unanimous thank you the minutes 27 00:05:51,040 --> 00:05:59,140 are approved next we'll move to committee reports we have one item coming 28 00:05:59,140 --> 00:06:05,880 out of our June 26 committee of the whole meeting rezoning Z1324 South New 29 00:06:05,880 --> 00:06:10,200 Hope Road the committee voted this item out with no recommendation pending 30 00:06:10,200 --> 00:06:14,060 additional conditions from the applicant I'll ask staff for an update 31 00:06:14,060 --> 00:06:14,780 on this case. 32 00:06:17,550 --> 00:06:21,450 Good morning commissioners. Erin Klinger planning and development here 33 00:06:21,450 --> 00:06:28,470 to give an update on Z1324. As a refresher, the applicant is requesting to 34 00:06:28,470 --> 00:06:33,510 rezone approximately seven and three-quarters acres from R6 and R10 35 00:06:33,510 --> 00:06:41,510 to NX4CU. The deadline for action is August 26th. So the proposed 36 00:06:41,510 --> 00:06:45,610 conditions for the site would again limit uses that would otherwise be 37 00:06:45,610 --> 00:06:50,230 permitted in annex zoning on the portion of the property east of South New Hope 38 00:06:50,230 --> 00:06:54,870 Road, prohibit buildings within 200 feet of residential properties in the 39 00:06:54,870 --> 00:06:59,670 neighborhood to the northeast of the site, limit density to 150 dwelling units, 40 00:06:59,850 --> 00:07:05,270 and limit square footage for non-residential space to 35,000. Revised 41 00:07:05,270 --> 00:07:08,810 conditions that were submitted since the Committee of the Whole Meeting would 42 00:07:08,810 --> 00:07:14,170 prohibit hookah bars or vape and tobacco shops. Promise construction of a 43 00:07:14,170 --> 00:07:20,210 10-foot wide multi-use path from the new development to the Walnut Creek Greenway and state that 44 00:07:20,210 --> 00:07:25,290 the portion of the property south of the existing City of Raleigh sewer easement will not contain 45 00:07:25,290 --> 00:07:26,310 residential units. 46 00:07:28,980 --> 00:07:33,120 Again, the requested zoning is inconsistent with the future land use map 47 00:07:33,120 --> 00:07:38,880 designation of low-scale residential, which designates R2, R4, and R6 is the most 48 00:07:38,880 --> 00:07:43,340 appropriate zoning districts for this land use category, but it does envision a range 49 00:07:43,340 --> 00:07:48,260 of housing types. While the proposed zoning would permit the housing types described in 50 00:07:48,260 --> 00:07:53,640 this land use designation, it does so at a scale that better aligns with the neighborhood 51 00:07:53,640 --> 00:07:58,880 mixed use category. The request is consistent with the comprehensive 52 00:07:58,880 --> 00:08:03,840 plan. It supports policies and vision themes encouraging compact development of variety 53 00:08:03,840 --> 00:08:09,500 of housing types, infill development, and open space preservation. It also aligns with 54 00:08:09,500 --> 00:08:13,760 goals for increasing housing supply and supporting neighborhood serving retail. 55 00:08:14,640 --> 00:08:18,800 On the other hand, as mentioned on the last side, the request is inconsistent with the 56 00:08:18,800 --> 00:08:19,700 Futureland use map. 57 00:08:22,170 --> 00:08:28,230 The request aligns with the policy shown here related to infill development, diversifying 58 00:08:28,230 --> 00:08:30,430 housing options and preserving open space. 59 00:08:31,090 --> 00:08:35,910 It also supports broader goals related to housing availability and access to neighborhood 60 00:08:35,910 --> 00:08:37,210 scale commercial uses. 61 00:08:38,250 --> 00:08:45,750 As you can see here, the revised conditions have added policy PR 3.13 greenway-oriented 62 00:08:45,750 --> 00:08:49,650 development to the list of policies with which the request is consistent. 63 00:08:51,450 --> 00:08:54,030 Inconsistent policies include those shown here. 64 00:08:54,210 --> 00:08:56,030 These have not changed from the last meeting. 65 00:08:58,390 --> 00:09:00,930 There are no outstanding issues with the request. 66 00:09:01,150 --> 00:09:05,810 Again, the deadline for action is August 26th, which is also when the next meeting 67 00:09:05,810 --> 00:09:06,170 is. 68 00:09:07,470 --> 00:09:10,990 The request would require an amendment to the future land use map. 69 00:09:11,430 --> 00:09:15,470 Approval would amend the map from low-scale residential to neighborhood mixed use. 70 00:09:17,330 --> 00:09:21,730 And again, if the rezoning is approved, it would amend the future land use map. 71 00:09:25,570 --> 00:09:26,290 Thank you. 72 00:09:26,670 --> 00:09:32,630 We've received a full presentation from the applicant and heard from members of the public at the committee meeting. 73 00:09:33,390 --> 00:09:37,310 Are there members of the public who wish to speak on this item? 74 00:09:37,310 --> 00:09:38,130 Okay 75 00:09:42,320 --> 00:09:48,760 I see the applicant. I'll grant without objection five minutes to each 76 00:09:48,760 --> 00:09:48,980 slide. 77 00:09:55,800 --> 00:09:58,720 Good morning Chair Bennett and members of the Planning Commission 78 00:09:58,720 --> 00:10:05,200 worth mills with Longleaf partners here on behalf of Go Long Holdings LLC who 79 00:10:05,200 --> 00:10:10,220 is the property owner and the rezoning applicant. When this case was at 80 00:10:10,220 --> 00:10:16,160 Committee of the Whole there were a handful of questions specifically with 81 00:10:16,160 --> 00:10:23,300 with regard to our zoning conditions and what we were going to be offering in the interim 82 00:10:23,300 --> 00:10:27,100 between the Committee of the Whole meeting and this Planning Commission meeting. 83 00:10:28,160 --> 00:10:35,040 For one, we have reworked condition two, which is the prohibition on hookah bars and vape 84 00:10:35,040 --> 00:10:40,960 or tobacco shops to make sure that it is clearly defined and that the condition 85 00:10:40,960 --> 00:10:47,260 does not prohibit other retail uses like a gas station or a convenience store from selling 86 00:10:47,260 --> 00:10:53,040 those products, but making sure that we're keeping a specific hookah bar or vape tobacco 87 00:10:53,040 --> 00:10:55,000 shop out of this site. 88 00:10:55,720 --> 00:11:02,240 We have also included the condition to connect this development to the Walnut Creek Greenway 89 00:11:02,240 --> 00:11:04,860 Trail with a 10-foot wide multi-use path. 90 00:11:04,860 --> 00:11:11,320 and we have offered a condition that requires all of the land south of the 91 00:11:11,320 --> 00:11:16,880 existing city of Raleigh sewer easement to be set aside for commercial space 92 00:11:16,880 --> 00:11:23,600 which is a big point of contention for a lot of cases in Southeast Raleigh that 93 00:11:23,600 --> 00:11:29,880 offer commercial uses but don't actually put those uses into practice so we 94 00:11:29,880 --> 00:11:34,500 want to make sure that we are setting aside land for commercial uses that 95 00:11:34,500 --> 00:11:43,520 will benefit this community as well as the surrounding neighborhoods. While this rezoning 96 00:11:43,520 --> 00:11:47,860 is inconsistent with the future land use map, it is consistent with the comprehensive plan 97 00:11:47,860 --> 00:11:56,300 overall and given the constraints that are on the property today with the Duke Energy 98 00:11:56,300 --> 00:12:00,480 Transmission Line easement as well as that City of Raleigh Sewer easement, we think 99 00:12:00,480 --> 00:12:04,340 that the highest and best use of this property is for multifamily with 100 00:12:04,340 --> 00:12:09,280 commercial uses on that southern side. Having the ability to connect to the 101 00:12:09,280 --> 00:12:15,880 greenway offers folks additional ways to access the site. We have access off of 102 00:12:15,880 --> 00:12:21,080 South New Hope Road through a right in right out and we'll also be extending 103 00:12:21,080 --> 00:12:25,980 Maybrook Drive to open up that piece of the street as public right of way 104 00:12:25,980 --> 00:12:30,020 which again not only benefits this site but also benefits the 105 00:12:30,020 --> 00:12:35,300 neighborhoods to our east. Myself and Peter Knossin are here to answer any 106 00:12:35,300 --> 00:12:39,240 questions. Thank you for the time this morning and we appreciate your 107 00:12:39,240 --> 00:12:43,860 consideration. Thank you. Thank you, Mr. Mills. Is there anyone else here who 108 00:12:43,860 --> 00:12:46,620 wishes to speak in support of this case? 109 00:12:49,090 --> 00:12:51,250 Seeing none, we'll turn to the 110 00:12:51,250 --> 00:12:54,990 opposition. Is there anyone here who wishes to speak in opposition? 111 00:12:57,640 --> 00:12:57,940 Okay, 112 00:12:58,060 --> 00:13:00,880 I'll bring it back to the table then. Commissioners, do you have any 113 00:13:00,880 --> 00:13:02,340 any questions or comments? 114 00:13:06,730 --> 00:13:07,690 Commissioner McCoy. 115 00:13:08,730 --> 00:13:14,410 The last time that you all came to the Committee of the Whole, we discussed making sure that 116 00:13:14,410 --> 00:13:18,770 a good amount of residents knew about this project. Have you all done any extra outreach 117 00:13:18,770 --> 00:13:21,990 in July to make sure that residents knew about it who didn't know? 118 00:13:22,470 --> 00:13:28,750 We did not. We held two neighborhood meetings and have kept those attendees who are those 119 00:13:28,750 --> 00:13:35,310 Those who attended and who sent us email addresses, we've been in communication with those folks 120 00:13:35,910 --> 00:13:43,590 throughout the rezoning process to give them updates on new conditions and to answer general 121 00:13:43,590 --> 00:13:45,790 questions that they've had throughout the process. 122 00:13:45,970 --> 00:13:51,710 But we did not hold any new neighborhood meetings just given the fact that the first two neighborhood 123 00:13:51,710 --> 00:13:57,450 meetings were fairly positive and people were on board with bringing new commercial 124 00:13:57,450 --> 00:14:03,230 uses to the site. Do you have an idea of what commercial I heard also in the 125 00:14:03,230 --> 00:14:07,010 committee of the whole and what you said now that it's a prohibition on vape 126 00:14:07,010 --> 00:14:10,650 shops and things like that but do you have an idea of what type of commercial 127 00:14:10,650 --> 00:14:14,510 use you want this space to be? Yeah there were so in talking with the 128 00:14:14,510 --> 00:14:19,630 applicant and the property owner they envisioned either some sort of office 129 00:14:19,630 --> 00:14:25,390 use or some sort of restaurant maybe a combination of the two like fast 130 00:14:25,390 --> 00:14:34,070 casual restaurants, but no specific tenants or mix of uses have been sort of selected at 131 00:14:34,070 --> 00:14:34,450 this point. 132 00:14:37,590 --> 00:14:39,150 Any other questions or comments? 133 00:14:41,250 --> 00:14:43,510 If not, then I will entertain a motion, 134 00:14:45,760 --> 00:14:46,460 Commissioner Fox. 135 00:14:48,260 --> 00:14:55,100 In regards to case Z1324, I moved to recommend adoption of the proposed consistency statement 136 00:14:55,100 --> 00:14:59,680 dated August 12, 2025, contained in the Agenda Materials and recommended 137 00:15:00,000 --> 00:15:05,680 So includes an amendment to the future land use map to the extent described in the adopted consistency statement. 138 00:15:06,020 --> 00:15:08,100 We have a motion. Do I have a second? 139 00:15:09,560 --> 00:15:13,180 Commissioner Miller has seconded the motion. Any other discussion? 140 00:15:14,240 --> 00:15:16,060 If not, all in favor? 141 00:15:19,200 --> 00:15:19,800 All opposed? 142 00:15:22,390 --> 00:15:24,730 Thank you. That is how many of us are there? 143 00:15:27,240 --> 00:15:28,220 Eight to one. 144 00:15:29,780 --> 00:15:31,420 Thank you very much. 145 00:15:32,400 --> 00:15:37,120 Commissioner Omakaiye, would you like to state for the record your opposition to the case? 146 00:15:39,840 --> 00:15:45,240 I live in this community, like literally this project is up the street for me and around the corner. 147 00:15:46,420 --> 00:15:52,380 It's a two-lane road, same thing I said in Committee of the Whole, that this is going to increase traffic in that area. 148 00:15:52,540 --> 00:15:57,180 Rock Wari already has substantial traffic, especially going past New Hope. 149 00:15:57,700 --> 00:15:59,360 That's going to increase that traffic. 150 00:15:59,360 --> 00:16:04,200 my mom lives literally right there on the map and she didn't get any 151 00:16:04,200 --> 00:16:08,800 notification or information about this rezoning. I know that there is a little 152 00:16:08,800 --> 00:16:14,220 tiny yard sign on New Hope Road when you pass it but there's no even sidewalk or 153 00:16:14,220 --> 00:16:17,960 place for somebody to pull over to even scan that sign. So I don't think that 154 00:16:17,960 --> 00:16:22,980 the community was well and held and aware of this project. We had 155 00:16:22,980 --> 00:16:25,920 community members come to the community hold against this project. 156 00:16:28,380 --> 00:16:30,640 Yeah, so those are my reasons. 157 00:16:31,020 --> 00:16:32,240 Okay, thank you. 158 00:16:34,850 --> 00:16:43,990 Next we'll move on to old business and our first item is Z51-24 Fairbanks Road. 159 00:16:44,550 --> 00:16:49,130 This case was deferred from our June 24th meeting to allow the applicant to address 160 00:16:49,130 --> 00:16:52,670 a boundary issue. I'll ask staff to provide an update. 161 00:16:52,670 --> 00:16:53,230 Good 162 00:17:03,410 --> 00:17:08,510 morning, Erin Klinger again here to give an update on Z51-24. 163 00:17:11,070 --> 00:17:17,410 The request has been updated because as the boundary, previous boundary line issue has 164 00:17:17,410 --> 00:17:26,050 been resolved, the request is now to rezone from NX3CU and R10CU to NX3CU. 165 00:17:26,690 --> 00:17:30,250 The deadline for action is August 28th. 166 00:17:31,070 --> 00:17:36,410 Again, as a reminder, the proposed conditions would prohibit several uses that would otherwise 167 00:17:36,410 --> 00:17:43,270 be allowed in NX3CU zoning, limit density to no more than 60 dwelling units, and limit 168 00:17:43,270 --> 00:17:47,870 off square footage for office and retail to use 65,000 square feet each. 169 00:17:48,390 --> 00:17:52,970 Other than the current zoning having been updated to reflect the corrected parcel 170 00:17:52,970 --> 00:17:57,450 boundaries, the case has not changed since it was last heard before the commission. 171 00:17:58,690 --> 00:18:07,810 The requested zoning is consistent with the neighborhood mixed-use land designation and it is consistent with the comprehensive plan overall. 172 00:18:09,980 --> 00:18:18,700 Here is a list of policies with which the request is consistent and no policies were found with which it is inconsistent. 173 00:18:20,140 --> 00:18:23,460 Again the previous boundary line issue has been resolved. 174 00:18:24,020 --> 00:18:27,380 There are no additional outstanding issues with the request. 175 00:18:27,860 --> 00:18:33,340 Again, the deadline for action is August 28th and the next meeting is on August 26th. 176 00:18:37,370 --> 00:18:38,510 Thank you for the update. 177 00:18:39,190 --> 00:18:44,490 Are there any members of the public who wish to speak either in support or opposition of 178 00:18:44,490 --> 00:18:44,910 this case? 179 00:18:51,000 --> 00:18:54,400 Without objection, I will give five minutes to each side. 180 00:18:54,600 --> 00:18:58,620 I was just going to say, Chair Bennett, Toby Coleman here on behalf of the applicants 181 00:18:58,620 --> 00:19:01,640 were available for questions if there are any questions. 182 00:19:04,060 --> 00:19:06,020 Otherwise, we're happy to sit on down. 183 00:19:06,020 --> 00:19:12,060 Thank you. Bringing it back to the table. Are there any questions or comments from the commissioners? 184 00:19:14,270 --> 00:19:16,170 If not, I will entertain a motion. 185 00:19:18,640 --> 00:19:23,560 Motion to approve this case and adopt the proposed Consistency C statement contained in the agenda materials. 186 00:19:24,100 --> 00:19:26,120 Thank you, Commissioner Miller. Do I have a second? 187 00:19:27,620 --> 00:19:30,720 Thank you, Commissioner Burnett. Any further discussion? 188 00:19:33,010 --> 00:19:35,450 Okay, we have a motion to approve. All those in favor? 189 00:19:37,780 --> 00:19:38,440 All opposed? 190 00:19:40,500 --> 00:19:42,540 That is 9-0. 191 00:19:42,540 --> 00:19:53,140 Thank you very much. Our next old business item is Z10-25-8125 Leesville Road. We received 192 00:19:53,140 --> 00:19:58,100 a full presentation from staff and the applicant and received public comment at our June 24th 193 00:19:58,100 --> 00:20:02,540 meeting. The case was deferred to allow the applicant to consider additional conditions. 194 00:20:03,060 --> 00:20:04,780 I'll ask staff for a brief update. 195 00:20:10,760 --> 00:20:12,820 Good morning. Meet your chef for Adirond here 196 00:20:12,820 --> 00:20:15,400 We're writing an update on Z1025. 197 00:20:17,340 --> 00:20:22,620 As a reminder, the request is to rezone just under three acres of land from R4 to R10, 198 00:20:22,820 --> 00:20:25,380 CU, located at 8125 Leeswell Road. 199 00:20:25,780 --> 00:20:31,040 Since your last meeting, the applicant has submitted five new conditions, which I'll 200 00:20:31,040 --> 00:20:34,120 touch on today, and then your deadline for action is August 23rd. 201 00:20:34,780 --> 00:20:37,780 Just another general overview of where the site is located. 202 00:20:39,920 --> 00:20:43,860 Conditions 1 through 4 have remained the same since your last PC meeting. 203 00:20:45,060 --> 00:20:50,040 The first condition is prohibiting a number of uses, otherwise allowed in R10, prohibiting 204 00:20:50,040 --> 00:20:55,260 the apartment building type, and then conditions 3 and 4 increase the side yard and rear yard 205 00:20:55,260 --> 00:21:00,160 setbacks to 10 and 30 feet along the southern and western boundaries of the site, and then 206 00:21:00,160 --> 00:21:06,300 also creating a six foot or requiring the installation of a six foot wall and tree 207 00:21:06,300 --> 00:21:10,880 buffer along that same boundary, along the Ghostpony Trail sub. 208 00:21:12,600 --> 00:21:15,340 And then conditions five through nine will be new to you all. 209 00:21:16,340 --> 00:21:20,500 I will say that these, there's a slight change between this and what's included in the agenda 210 00:21:20,500 --> 00:21:23,980 materials because of these are the official signed conditions. 211 00:21:24,940 --> 00:21:29,880 But condition number five exempts the site from block perimeter and dead-end treat requirements 212 00:21:29,880 --> 00:21:31,380 and the substitute requirements. 213 00:21:33,540 --> 00:21:36,760 Also requiring a minimum roof pitch of four and 12 214 00:21:36,760 --> 00:21:40,420 and then also capping residential height at 40 feet. 215 00:21:41,100 --> 00:21:42,580 And then as well as condition eight, 216 00:21:43,020 --> 00:21:45,560 requiring the installation of a speed hump 217 00:21:45,560 --> 00:21:47,500 either within the Ghostpony Trail right away 218 00:21:47,500 --> 00:21:51,240 or an internal private drive aisle on the development site 219 00:21:51,240 --> 00:21:53,040 should the development take access 220 00:21:53,040 --> 00:21:54,560 from the Ghostpony Trail sub. 221 00:21:55,320 --> 00:21:58,400 And then the final condition is requiring 222 00:21:58,400 --> 00:22:03,860 hearing at least two of the following materials be included in future residential development 223 00:22:03,860 --> 00:22:09,360 front facades. Again, the request is consistent with the comprehensive plan and consistent 224 00:22:09,360 --> 00:22:14,520 with the future land use map designation of moderate-scale residential, a list of consistent 225 00:22:14,520 --> 00:22:19,060 policies that have remained the same since your last meeting, and only two inconsistent 226 00:22:19,060 --> 00:22:24,880 policies were identified this week to fire service response time standards. And then 227 00:22:24,880 --> 00:22:27,460 there are no outstanding issues for the case and your deadline for action is 228 00:22:27,460 --> 00:22:30,400 August 23rd, which is before your next PC meeting. 229 00:22:32,590 --> 00:22:33,890 Thank you for the update. 230 00:22:34,530 --> 00:22:39,850 We received a full presentation from the applicant and public comment at our last meeting. 231 00:22:40,290 --> 00:22:44,710 But could I see if there's anyone here who wishes to speak on this case? 232 00:22:45,790 --> 00:22:46,590 I see Mr. Mills. 233 00:22:47,450 --> 00:22:48,070 Can I see another? 234 00:22:49,410 --> 00:22:53,290 Without objection, I'll grant five additional minutes to each side. 235 00:22:56,020 --> 00:22:58,900 We'll start with the applicant and those in support. 236 00:22:58,900 --> 00:22:59,880 Good 237 00:23:05,090 --> 00:23:09,890 morning again commissioners, Worth Mills here on behalf of Vibes Fund LLC, the applicant. 238 00:23:10,770 --> 00:23:18,310 I did want to go over the updated conditions that we've offered since our last meeting. 239 00:23:18,550 --> 00:23:24,230 We did hold another virtual neighborhood meeting with neighbors on July 29th and shared these 240 00:23:24,230 --> 00:23:24,810 conditions. 241 00:23:25,870 --> 00:23:30,670 So first we've extended the rear yard setback from the two adjacent single family homes 242 00:23:30,670 --> 00:23:37,230 on Ghost Pony from 30 feet to 40 feet so that rear yard setback is now larger than the current 243 00:23:37,230 --> 00:23:42,970 R4 zoning requires. We've exempted ourselves from the block perimeter requirements which 244 00:23:42,970 --> 00:23:50,610 is consistent with the exception that we meet in section 8.3.2. We've effectively eliminated 245 00:23:50,610 --> 00:23:57,010 flat roofs and rooftop living space and we have lowered maximum building height to 246 00:23:57,010 --> 00:24:04,130 40 feet, both of those are intended to sort of create a more compatible development with 247 00:24:04,130 --> 00:24:09,910 the Ghostpony Trail neighbors. We've required an installation of a speed hump along the 248 00:24:09,910 --> 00:24:15,730 extension of Ghostpony Trail in conversations with City of Raleigh Transportation. It's 249 00:24:15,730 --> 00:24:21,750 become pretty clear that our access to Leesville Road will be from Ghostpony to Country 250 00:24:21,750 --> 00:24:27,530 trail to Leesville instead of going north through that potential future development at 251 00:24:27,530 --> 00:24:29,310 8215 Leesville Road. 252 00:24:30,150 --> 00:24:33,770 So knowing that, we wanted to offer a condition for traffic calming. 253 00:24:34,570 --> 00:24:39,030 And we've required each home to include at least two building materials into the front 254 00:24:39,030 --> 00:24:43,950 facade, which is similar to the architectural designs of those homes along Ghostpony 255 00:24:43,950 --> 00:24:44,270 Trail. 256 00:24:44,870 --> 00:24:50,570 There are two conditions that, by my error, did not make it into the updated zoning 257 00:24:50,570 --> 00:24:59,650 conditions. One is a maximum development of 22 units and the second is a condition to 258 00:24:59,650 --> 00:25:06,770 require no more than six individual town home units within a town home building to help 259 00:25:06,770 --> 00:25:11,030 with the building massing. I did just want to let the Planning Commission know that 260 00:25:11,030 --> 00:25:15,050 we would intend to hold this case at City Council when it gets there to offer those 261 00:25:15,050 --> 00:25:20,170 conditions before the public hearing, and that is 100 percent my mistake. 262 00:25:21,370 --> 00:25:28,410 I also wanted to show a concept plan that Gary Walston at B&K put together. 263 00:25:29,470 --> 00:25:37,090 This concept plan shows 17 townhome units with the extension of Ghostpony Trail as 264 00:25:37,090 --> 00:25:42,050 a private drive looping around the site and then exiting back south. 265 00:25:42,050 --> 00:25:47,850 each town home would have a garage and a driveway and there are 10 additional 266 00:25:47,850 --> 00:25:53,790 guest parking spaces in the center. We are showing two stormwater control 267 00:25:53,790 --> 00:25:59,350 devices on the western boundary of the site. Those would drain into the stream 268 00:25:59,350 --> 00:26:05,930 that's located on that larger 8215 Leesville Road site. Again the cases 269 00:26:05,930 --> 00:26:10,170 consistent with the future land use map, the comprehensive plan, we've 270 00:26:10,170 --> 00:26:16,450 We've offered conditions to increase compatibility with our neighbors along Ghostpony Trail, 271 00:26:17,070 --> 00:26:20,430 but happy to answer any questions that you have this morning, and we appreciate your 272 00:26:20,430 --> 00:26:20,630 time. 273 00:26:21,130 --> 00:26:22,310 Thank you, Mr. Mills. 274 00:26:23,190 --> 00:26:25,970 Is there anyone else here who wishes to speak in support of the case? 275 00:26:27,290 --> 00:26:29,450 If not, then we will turn to the opposition. 276 00:26:29,770 --> 00:26:30,970 You have five minutes as well. 277 00:26:33,610 --> 00:26:35,270 Please state your name for the record. 278 00:26:55,700 --> 00:26:56,080 Hi, good morning. 279 00:26:56,360 --> 00:26:57,140 My name is Eric Cungate. 280 00:26:57,240 --> 00:26:59,980 I'm the Vice President of the HOA for Westlake Country Trail. 281 00:26:59,980 --> 00:27:01,920 I want to thank you all for allowing us to speak this morning. 282 00:27:03,260 --> 00:27:09,040 I'm here to summarize our safety concerns for this rezoning and why we hope you will vote against it today. 283 00:27:09,540 --> 00:27:11,720 I want to start by saying we're not against development. 284 00:27:12,220 --> 00:27:16,040 We understand that Raleigh has a housing issue and we're not against development of this property. 285 00:27:16,620 --> 00:27:17,680 We bought into this neighborhood. 286 00:27:18,020 --> 00:27:23,360 We understood that we were buying into an early phase of the neighborhood that would be growing into a larger neighborhood 287 00:27:23,360 --> 00:27:27,840 that would be built cohesively with similar looking homes with systems that work together. 288 00:27:27,840 --> 00:27:34,000 that was approved by the city in 2017 and you can see here this is the next 289 00:27:34,000 --> 00:27:37,400 phase of the property this is my home right here so this next property was 290 00:27:37,400 --> 00:27:41,560 supposed to be six homes which we were actually kind of excited about so now 291 00:27:41,560 --> 00:27:46,780 there's going to be townhomes there just a few of our to summarize of our 292 00:27:46,780 --> 00:27:50,020 concerns is adding a town home community in between two sections of 293 00:27:50,020 --> 00:27:52,820 the neighborhood will create disjointed developments with limited 294 00:27:52,820 --> 00:27:56,520 ability to solve future issues cohesively there's actually a third 295 00:27:56,520 --> 00:28:00,480 property that's going to be part of this land area as well, so you'll have three separate 296 00:28:00,480 --> 00:28:05,220 neighborhoods that aren't really speaking and working together to make sure there's 297 00:28:05,220 --> 00:28:06,160 no issues down the road. 298 00:28:06,840 --> 00:28:08,100 Stormwater is another concern. 299 00:28:08,520 --> 00:28:12,560 The current infrastructure on Ghostpony Trail simply cannot absorb any more runoff from 300 00:28:12,560 --> 00:28:14,520 this development, especially not in R10. 301 00:28:15,380 --> 00:28:19,180 The property is uphill, and all the water will be pushed down into a creek which 302 00:28:19,180 --> 00:28:23,160 currently runs through the back of our properties and the lower part of our community. 303 00:28:23,160 --> 00:28:27,740 It already crests the banks of the creek when we get heavy rain. 304 00:28:28,160 --> 00:28:32,920 There's also no clear plan as to how the property stormwater systems will work together 305 00:28:32,920 --> 00:28:36,560 with the new Winters Hollow, which is the other property, as well as our property. 306 00:28:36,720 --> 00:28:39,840 So you're looking at three different storm systems that are not working together. 307 00:28:40,960 --> 00:28:46,040 The couple other of our final concerns is the investor doesn't really have any details 308 00:28:46,040 --> 00:28:50,020 for price points, number of bedrooms, floor plans, et cetera, because we believe that 309 00:28:50,020 --> 00:28:50,960 he is not a developer. 310 00:28:50,960 --> 00:28:55,780 developer. We suspect he is planning to sell the property once re-zoned to another developer, 311 00:28:56,140 --> 00:29:01,320 which again leaves so many different questions that are still out there. Also, the possibility 312 00:29:01,320 --> 00:29:05,360 of renters. You know, sometimes renters don't care about the neighborhood quite as much 313 00:29:05,360 --> 00:29:08,800 as someone who might own the home. And some of their back decks will be backing up 314 00:29:08,800 --> 00:29:13,960 right up to my house. And our property, which we are worried about renters having 315 00:29:13,960 --> 00:29:17,640 more parties there because when I was in a town home, I attended the party on 316 00:29:17,640 --> 00:29:20,520 back decks too. So that's one of our concerns. 317 00:29:21,900 --> 00:29:28,500 Adrienne Turner, as Commissioner Bennett noted during the last meeting traffic in the Leesville 318 00:29:28,500 --> 00:29:35,800 area is a huge concern. This is a three school campus that serves more than 4,000 students 319 00:29:35,800 --> 00:29:42,720 all on two lane roads. We have a street with a lot of blind turns. It is uphill. 320 00:29:42,720 --> 00:29:47,560 hill. It is not flat. It's hard to tell from these pictures. This is an uphill neighborhood. 321 00:29:48,260 --> 00:29:54,640 This is also a neighborhood yield street. So parking is a huge concern. We have asked for 322 00:29:54,640 --> 00:29:57,020 a condition of two car garages. 323 00:30:00,000 --> 00:30:06,220 Or covenants. This street cannot handle the parking that will happen from all of these town 324 00:30:06,220 --> 00:30:06,620 homes. 325 00:30:09,280 --> 00:30:16,280 Hi, Marianne Hungate. And final minute, I'm going to just show you some photos so that 326 00:30:16,280 --> 00:30:22,000 you can see some of the impact of the stormwater issues that we're having today. And nothing 327 00:30:22,000 --> 00:30:27,260 has been cleared yet. There will be not one, but two properties bordering our street. 328 00:30:27,260 --> 00:30:34,560 And the solution is to use a small stream. 329 00:30:35,120 --> 00:30:37,620 The wrong way. 330 00:30:37,900 --> 00:30:41,040 I'm just going to show you what that stream looks like today after a rain event. 331 00:30:42,000 --> 00:30:48,100 And as everyone knows, these rain events are becoming more and more frequent as time goes by. 332 00:30:48,200 --> 00:30:52,100 And this is the solution that was just presented for the stormwater. 333 00:30:52,200 --> 00:30:56,780 Is this little tiny creek for, again, not one, but two proposed developments? 334 00:30:56,780 --> 00:31:02,460 and we do not consider this to be a solution, we are concerned that it will run down the 335 00:31:02,460 --> 00:31:05,040 street and flood our properties. 336 00:31:09,380 --> 00:31:11,760 Kyle Smith, I live on Ghostpony Trail. 337 00:31:12,240 --> 00:31:17,680 We have a couple additional slides showing traffic concerns, which largely speak for 338 00:31:17,680 --> 00:31:18,000 themselves. 339 00:31:18,260 --> 00:31:23,780 It's heavily trafficked, low visibility, high frequency of accidents, and so increasing 340 00:31:23,780 --> 00:31:29,320 density of traffic with no plan to mitigate the safety concerns is dangerous and unreasonable. 341 00:31:30,660 --> 00:31:34,860 And I think I'll just wrap up by saying much has been made of the fact that the future 342 00:31:34,860 --> 00:31:38,600 land use map contemplates that this would eventually be R10 zoning. 343 00:31:38,820 --> 00:31:42,660 But what's lost in that discussion is the fact that the current zoning map and the 344 00:31:42,660 --> 00:31:46,700 future land use map contemplate that our neighborhood and the two adjoining parcels 345 00:31:46,700 --> 00:31:48,020 will share a zoning. 346 00:31:48,320 --> 00:31:53,980 And so eventually, yes, these three parcels together may be re-zoned, but it's not 347 00:31:53,980 --> 00:32:00,180 reasonable to kind of do a piecemeal and abandon the original plan for a cohesive community 348 00:32:00,180 --> 00:32:05,080 of 30 to 35 neighborhoods just for density for density's sake. So thank you for your 349 00:32:05,080 --> 00:32:09,200 consideration and absent any questions. We'll turn it back to the commission. 350 00:32:09,740 --> 00:32:10,340 Thank you. 351 00:32:12,820 --> 00:32:16,060 Okay, commissioners, we'll bring it back to the table for your questions 352 00:32:16,560 --> 00:32:17,240 and comments. 353 00:32:20,620 --> 00:32:21,480 Commissioner Burnett. 354 00:32:22,120 --> 00:32:26,760 For the applicant, my question is, I mean, they've made a really compelling case 355 00:32:26,760 --> 00:32:28,540 regarding just like the stormwater runoff. 356 00:32:28,660 --> 00:32:30,240 It seems like it's going to be a really big problem. 357 00:32:30,760 --> 00:32:32,380 I was just looking at it on Google Maps, 358 00:32:32,560 --> 00:32:34,680 and I actually used to go to Leesville. 359 00:32:34,780 --> 00:32:37,080 So I remember how far that slopes downward. 360 00:32:37,480 --> 00:32:39,580 You have any information from the site survey 361 00:32:39,580 --> 00:32:44,220 about how far that slopes down, et cetera, et cetera? 362 00:32:59,260 --> 00:33:02,460 Yeah, I'm going to have David Blevins, one of our engineers 363 00:33:02,460 --> 00:33:05,580 with BNK, walk through the stormwater. 364 00:33:09,820 --> 00:33:10,500 Good morning. 365 00:33:10,820 --> 00:33:12,520 My name is David Blevins. 366 00:33:12,520 --> 00:33:22,080 I'm an engineer with Bass, Nixon, Kennedy, 6310 Chapel Hill Road, Raleigh, 27607. 367 00:33:22,640 --> 00:33:31,220 I just did a, of course I did a brief analysis of the stormwater, but the topographic condition 368 00:33:31,220 --> 00:33:38,660 of this property is such that the runoff naturally goes to the back of the property 369 00:33:38,660 --> 00:33:40,840 from Leesville Road to the back. 370 00:33:40,840 --> 00:33:46,440 back. We can't change that. That's just the way the property was made. And of course the 371 00:33:46,440 --> 00:33:54,720 stream is at the back. And so I looked at the, I did just an analysis of the impervious 372 00:33:54,720 --> 00:34:04,720 area of the layout that Gary did. And then I did an analysis, just looked at the impervious 373 00:34:04,720 --> 00:34:17,980 area of a six-lot residential development, just similar to what was shown and put 38% 374 00:34:18,540 --> 00:34:23,880 impervious for, which is the allowable for single family R4. 375 00:34:24,500 --> 00:34:32,400 And there was about 1,700 square feet more impervious area for the townhomes. 376 00:34:32,400 --> 00:34:40,160 So in the world of stormwater for us, that's really a very, very manageable number. 377 00:34:40,480 --> 00:34:50,440 It really doesn't, it doesn't, it's something that we can easily manage, so, but yeah, that's, 378 00:34:51,360 --> 00:34:58,880 our, we will not be running any stormwater into there, into ghost pony trails, 379 00:35:01,180 --> 00:35:07,060 existing stormwater system at all that will be impacting there. All of our 380 00:35:07,060 --> 00:35:12,880 stormwater has to stand alone in whatever stormwater devices we create to 381 00:35:12,880 --> 00:35:15,680 manage both water quality and quantity. 382 00:35:19,600 --> 00:35:20,160 Thank you. 383 00:35:22,370 --> 00:35:24,530 Commissioner Cochran. I 384 00:35:24,530 --> 00:35:28,950 actually have another question about the stormwater. In your analysis you said 385 00:35:28,950 --> 00:35:34,450 Did you base it on the 17 units shown, but you're asking for a condition for 22 units? 386 00:35:36,850 --> 00:35:41,870 So that 17% increases based on 17 units, not 22, correct? 387 00:35:42,970 --> 00:35:43,670 Yes, correct. 388 00:35:47,390 --> 00:35:48,090 Commissioner Atwell. 389 00:35:49,150 --> 00:35:53,330 I was wondering if we could get Raleigh Stormwater to comment on the difference in regulations 390 00:35:53,330 --> 00:35:58,690 that would be required for stormwater control between the two requested zonings and the 391 00:35:58,690 --> 00:36:00,230 potential impact to the system. 392 00:36:00,230 --> 00:36:01,050 Good 393 00:36:10,300 --> 00:36:17,460 morning, Sally Hoey, Raleigh Stormwater. Given the size of this parcel, the zoning 394 00:36:18,220 --> 00:36:19,220 does not matter. 395 00:36:21,700 --> 00:36:27,980 Because this parcel is greater than an acre, the full stormwater requirements 396 00:36:28,480 --> 00:36:35,220 apply, so there is no prescribed amount of impervious area. They just have to provide 397 00:36:35,220 --> 00:36:40,420 the treatment associated with the impervious area. Does that address your 398 00:36:40,420 --> 00:36:44,800 question? I think it does and if you could refresh my memory the current rules 399 00:36:44,800 --> 00:36:52,280 require that the development show no exceed, no excess, no increase in the 400 00:36:52,280 --> 00:36:56,160 amount of runoff from the site from current conditions. That's correct. 401 00:36:56,400 --> 00:37:00,420 There's two main components of the stormwater regulation. One is aimed at 402 00:37:00,420 --> 00:37:08,480 the quantity of water and that looks at the two and ten year design storms which is like 403 00:37:08,480 --> 00:37:18,000 the tenure is about I think 5.7 inches of rainfall and so it looks at the rate of flow coming 404 00:37:18,000 --> 00:37:22,900 off the site, the rate cannot increase. So if there was a pipe that was able to convey 405 00:37:23,360 --> 00:37:27,760 that flow under existing conditions or a stream that was able to contain it then it would 406 00:37:27,760 --> 00:37:31,880 continue to be able to contain it. Then the second component is about water 407 00:37:31,880 --> 00:37:36,960 quality and specifically because of the impairments in the new watershed for 408 00:37:36,960 --> 00:37:42,700 nutrients it looks at the amount of nitrogen so they would have to do some 409 00:37:42,700 --> 00:37:46,600 sort of treatment for nitrogen it would depend on the density of the site 410 00:37:46,600 --> 00:37:50,940 whether they had to provide on-site controls for that or could do by 411 00:37:53,420 --> 00:37:54,480 mitigation credits. 412 00:37:56,500 --> 00:38:01,080 And one follow-up, I realize this is out of your purview. I 413 00:38:01,080 --> 00:38:06,880 understand the city is taking over flood mapping responsibilities from FEMA and 414 00:38:06,880 --> 00:38:10,540 will be doing their own mapping on a more detailed scale. The site currently 415 00:38:10,540 --> 00:38:14,340 is not part of a regulatory floodplain nor is any part of Ghostpony Trail but 416 00:38:14,340 --> 00:38:19,800 there are flood prone soils located along the creek. Do we know if the 417 00:38:19,800 --> 00:38:24,440 city plans to expand the flood mapping modeling to this site or is there 418 00:38:24,440 --> 00:38:29,820 somewhere we can look for that? We are planning to expand flood plan mapping 419 00:38:29,820 --> 00:38:35,100 but actually that I can't give you a timeline on but in the changes we made 420 00:38:35,100 --> 00:38:43,940 to the UDO last fall there's a requirement that if there's flood 421 00:38:43,940 --> 00:38:51,340 soils or even if there's not flood soils, if there's a certain acreage of drainage area to a stream, 422 00:38:51,540 --> 00:38:59,020 the flood boundaries have to be mapped. So five acres, if there's flood soils, 25 acres, if there's 423 00:38:59,020 --> 00:39:04,860 not flood soils, requires some type of flood mapping. So it appears that would be required. 424 00:39:04,960 --> 00:39:09,320 I haven't calculated the drainage area, but there would likely be something done in this 425 00:39:09,320 --> 00:39:16,180 project. Thank you very much. Mr. Miller. Thank you and Sally just to double 426 00:39:16,180 --> 00:39:20,940 check that I heard you correctly. Did you say that whether regardless whether 427 00:39:20,940 --> 00:39:24,900 the development occurred under the current zoning or the proposed zoning 428 00:39:24,900 --> 00:39:29,300 that the stormwater controls with respect to impervious service would be 429 00:39:29,300 --> 00:39:34,940 the same either way? That's correct. It's only for parcels less than an 430 00:39:34,940 --> 00:39:40,900 acre where the the limits in the UDO apply so because this park is full is 431 00:39:40,900 --> 00:39:46,460 over an acre it it those limits do not apply thank you 432 00:39:46,460 --> 00:39:51,520 Commissioner McCoy I have a question to the gentleman that came up to talk 433 00:39:51,520 --> 00:39:57,120 about stormwater I know that I mean we've heard definitely that that's 434 00:39:57,120 --> 00:40:01,720 like one of the major issues of this site and I do hear you saying we'll 435 00:40:01,720 --> 00:40:06,600 do what we have to do but I'm wondering what specifically you have in mind to do 436 00:40:06,600 --> 00:40:10,620 to maintain the stormwater and then to also make sure that when future 437 00:40:10,620 --> 00:40:17,280 development comes it is able to be adaptable. Well we as Sally mentioned 438 00:40:17,280 --> 00:40:22,340 we'll have to meet all the requirements that Raleigh has for the two and two 439 00:40:22,340 --> 00:40:27,960 and ten year storms. Whenever you do stormwater detention for the ten year 440 00:40:27,960 --> 00:40:35,060 storm, you're actually doing the tension for a good portion of the 25-year 441 00:40:35,060 --> 00:40:46,120 storm, maybe 30 percent or so. So we won't know exactly what type of device 442 00:40:46,120 --> 00:40:50,980 we're going to use, but we will have to use a combination of something that 443 00:40:50,980 --> 00:40:58,780 would be water quality, like a bioretention basin. And then on top of that, we might 444 00:40:58,780 --> 00:41:11,380 store use storage for flooding to store some water on top of that. And so, you know, on 445 00:41:11,380 --> 00:41:17,420 a small site like this, I've done a lot of commercial sites. They're fairly simple 446 00:41:17,420 --> 00:41:25,720 to do and I think in the amount of area that we had left shown on Gary's sketch there, 447 00:41:25,880 --> 00:41:37,440 we had ample area to provide storage, you know, room for both devices, types of devices. 448 00:41:37,880 --> 00:41:43,560 And are you all intending to use the creek that they're mentioning as a measure of easing 449 00:41:43,560 --> 00:41:44,820 stormwater distribution? 450 00:41:44,820 --> 00:41:48,620 Well, that's where the storm water is going now. 451 00:41:48,940 --> 00:41:58,160 We don't have any other place to take it. 452 00:41:59,000 --> 00:42:08,780 The topographic configuration of the property takes all of the drainage to the back of the property. 453 00:42:08,780 --> 00:42:15,260 If we took it somewhere else, we would, if there was another opportunity to take it somewhere 454 00:42:15,260 --> 00:42:21,960 else, we would actually be violating the rules by diverting it from where it's naturally 455 00:42:21,960 --> 00:42:26,000 going to where it's not naturally going. 456 00:42:26,160 --> 00:42:29,820 So we have to take it to the area where it's naturally going. 457 00:42:30,060 --> 00:42:37,900 Do you plan on enhancing the creek to be able to, because I mean, I see it's called 458 00:42:37,900 --> 00:42:41,940 the creek but you know it's kind of tiny do you plan on enhancing that in any way 459 00:42:41,940 --> 00:42:46,480 to be able to maintain extra storm water drain off? Well the creek is not 460 00:42:46,480 --> 00:42:51,240 actually on our property so we don't have any plans to do anything to the 461 00:42:51,240 --> 00:42:55,560 creek because we don't have access to the property there is a development the 462 00:42:55,560 --> 00:43:03,900 winners hollow is a subdivision that is in the process now it is one that is 463 00:43:03,900 --> 00:43:10,760 a subdivision that will not be before the planning commission, it's just a staff-approved 464 00:43:10,760 --> 00:43:23,100 subdivision and they have some plans for stormwater on their property as well, but we can't get 465 00:43:23,100 --> 00:43:26,120 back there and do anything with the creek because it's not our property. 466 00:43:27,200 --> 00:43:27,660 Thank you. 467 00:43:27,880 --> 00:43:28,180 You're welcome. 468 00:43:28,420 --> 00:43:28,920 Commissioner Fox. 469 00:43:28,920 --> 00:43:31,400 May I follow up on that just really quickly? 470 00:43:31,900 --> 00:43:38,020 So if I was understanding the sorts of back-to-the-property, you have either retention or detention proposed. 471 00:43:39,680 --> 00:43:46,280 You have a stormwater device proposed on the property, which would slow flow to the stream. 472 00:43:47,020 --> 00:43:47,740 That's correct? 473 00:43:48,060 --> 00:43:48,200 Okay. 474 00:43:48,740 --> 00:43:49,100 Thank you. 475 00:43:49,100 --> 00:43:59,940 So, the intent of that is likely to create a condition where the stream can adequately 476 00:44:00,800 --> 00:44:02,100 convey that water? 477 00:44:02,740 --> 00:44:02,840 Is that correct? 478 00:44:02,840 --> 00:44:04,040 Well, correct. 479 00:44:04,500 --> 00:44:04,560 Okay. 480 00:44:04,560 --> 00:44:11,040 For the design storms that Sally mentioned, for the two and ten-year storms, and then 481 00:44:11,040 --> 00:44:13,500 for a good portion of the 25-year-old. 482 00:44:13,500 --> 00:44:13,780 Thank you. 483 00:44:14,100 --> 00:44:14,740 That helps. 484 00:44:17,980 --> 00:44:22,760 The gray shaded areas on the screen are those for stormwater retention. 485 00:44:23,480 --> 00:44:23,820 Thank you. 486 00:44:28,360 --> 00:44:30,040 The green is the amenity area. 487 00:44:32,590 --> 00:44:33,910 That's required for a town home. 488 00:44:33,930 --> 00:44:34,630 Are the two gray areas? 489 00:44:45,710 --> 00:44:48,170 We're laughing up that we can't see. 490 00:44:48,430 --> 00:44:49,190 We're all getting older. 491 00:44:50,730 --> 00:44:52,170 It's not shaded very well. 492 00:44:53,230 --> 00:44:55,830 Sally, could I ask you a question again, please? 493 00:45:00,000 --> 00:45:08,280 Specifically addressing the concerns that we heard from the public. And one of them was that 494 00:45:09,140 --> 00:45:17,120 there are going to be three different stormwater systems that aren't working together. Do you 495 00:45:17,120 --> 00:45:22,820 share that concern or is there some sort of cumulative impact assessment that would need 496 00:45:22,820 --> 00:45:27,520 to be done to ensure that they are in fact working together or is that not a concern? 497 00:45:28,500 --> 00:45:38,500 I mean, I don't have a large concern because each development will be held to the standards. 498 00:45:40,420 --> 00:45:46,960 I would see more of a concern from a, if I were a homeowner from an operation and maintenance 499 00:45:46,960 --> 00:45:52,280 standpoint that if there's more stormwater control measures, there'd be more things 500 00:45:52,280 --> 00:46:00,500 to maintain that sort of thing. But from the city standpoint in terms of the functionality, 501 00:46:01,540 --> 00:46:05,660 I think it's possible for them to operate independently. 502 00:46:06,660 --> 00:46:11,940 Okay. Thank you. Are there any other questions or comments about stormwater? 503 00:46:14,770 --> 00:46:16,070 Okay. Commissioner 504 00:46:16,070 --> 00:46:16,430 Atwell. 505 00:46:16,830 --> 00:46:20,330 Thank you, Chair Bennet. I note that the property that contains the creek is owned 506 00:46:20,330 --> 00:46:25,790 by the Church of Latter-day Saints as the city received any feedback or engagement from 507 00:46:25,790 --> 00:46:26,290 the church? 508 00:46:30,870 --> 00:46:38,250 That site is currently undergoing like subdivision insight plan review and then has like indicated 509 00:46:38,250 --> 00:46:41,350 that they're applying for annexation currently. 510 00:46:44,930 --> 00:46:46,190 So you're reaching for your mic? 511 00:46:48,620 --> 00:46:48,680 Yes. 512 00:46:48,900 --> 00:46:49,200 Thank you. 513 00:46:52,660 --> 00:46:56,080 I acknowledge there are likely some stormwater concerns there. 514 00:46:56,080 --> 00:47:03,660 I'm comfortable and confident that the code can actually handle that if it's 515 00:47:03,660 --> 00:47:08,680 built to standard. The only inconsistency I'm actually finding when going through 516 00:47:08,680 --> 00:47:14,700 the staff report is related to response times and I know we've had 517 00:47:14,700 --> 00:47:17,980 that come up a number of times. I was wondering, 518 00:47:19,180 --> 00:47:26,320 Bynum, could you remind me the study that, I believe, Fire Department was undergoing? 519 00:47:27,240 --> 00:47:27,460 Sure. 520 00:47:27,700 --> 00:47:36,260 So City Council saw the Fire Department Master Plan before the break, and that document prioritizes 521 00:47:36,840 --> 00:47:37,700 some new stations. 522 00:47:37,900 --> 00:47:40,080 I don't remember that there was one in this vicinity. 523 00:47:40,560 --> 00:47:40,700 Okay. 524 00:47:40,940 --> 00:47:41,340 Thank you. 525 00:47:42,040 --> 00:47:45,620 But I would also note that, thank 526 00:47:51,570 --> 00:47:51,930 you. 527 00:47:53,330 --> 00:47:59,690 regarding traffic. So I did mention at the last meeting that all three of my 528 00:47:59,690 --> 00:48:04,450 all three of my kids, both of my kids, I just got a ghost kid from somewhere, both 529 00:48:04,450 --> 00:48:10,510 of my kids went to all three of the Leesville schools there so I've been 530 00:48:10,510 --> 00:48:17,530 driving that area for many many years and I was actually on the community 531 00:48:17,530 --> 00:48:24,170 task force that worked with the city to get grant funding to do the bike and 532 00:48:24,170 --> 00:48:30,410 ped improvements that are on Country Trail and Pride Way after a student was 533 00:48:30,410 --> 00:48:37,430 hit. So I'm aware of there's a lot of traffic. There was also a plan at some 534 00:48:37,430 --> 00:48:44,170 point to widen Leesville and that stretch of Leesville was has not been 535 00:48:44,170 --> 00:48:53,790 widen. I'm wondering if transportation staff can tell us is that in the queue to widen that 536 00:48:53,790 --> 00:48:55,350 stretch of Leesville? 537 00:49:02,430 --> 00:49:05,290 Good morning Planning Commission. Carter Robertson with transportation. 538 00:49:06,330 --> 00:49:14,150 So Leesville was evaluated as part of the last bond in 2017 to be widened. It ultimately wasn't 539 00:49:14,150 --> 00:49:18,230 selected at that time. It didn't rank as high as some of the others that were chosen. 540 00:49:18,230 --> 00:49:24,650 right now there's no current plans to widen it that might be evaluated as 541 00:49:24,650 --> 00:49:29,830 part of a future bond opportunity we do know there now that it is reaching 542 00:49:29,830 --> 00:49:35,710 capacity as a two-lane road and the future destination would accommodate 543 00:49:35,710 --> 00:49:42,050 for the current volume set of four lane okay but this project did not warrant 544 00:49:42,050 --> 00:49:49,610 TIA is that correct? No ma'am. Okay. Commissioner Atwell. Could you comment on 545 00:49:49,610 --> 00:49:53,190 the public engagement process for the Leesville Road widening project? Do you 546 00:49:53,190 --> 00:49:58,370 remember what the outcome of that was? I'm not familiar. I wasn't at the city at 547 00:49:58,370 --> 00:50:01,790 this time. Thank you. 548 00:50:06,460 --> 00:50:10,480 I do recall many years ago when the entire stretch of 549 00:50:10,480 --> 00:50:15,380 Leesville was being considered to be widened there was some 550 00:50:15,380 --> 00:50:20,460 opposition from the Springdale neighborhood about widening in that particular area. 551 00:50:21,220 --> 00:50:27,960 So I don't know this for a fact, but my guess is that part probably moved down in ranking 552 00:50:28,470 --> 00:50:32,720 because there was an opposition for the other part of Leesville, which is near widened, 553 00:50:32,760 --> 00:50:34,340 which is the part I live off of. 554 00:50:37,860 --> 00:50:40,840 Any other questions or comments from commissioners? 555 00:50:43,670 --> 00:50:46,650 If not, I will entertain a motion. 556 00:50:47,890 --> 00:50:48,630 Commissioner Miller. 557 00:50:49,370 --> 00:50:53,570 I wanted to address the applicant mentioned that there are two conditions that did not 558 00:50:53,570 --> 00:50:54,510 make it into this case. 559 00:50:56,730 --> 00:51:00,710 And I wanted to also address the conditions that were added and thank the applicant for 560 00:51:00,710 --> 00:51:06,350 those conditions related to the speed humps and traffic calming. 561 00:51:07,770 --> 00:51:13,930 And additionally, it seems that they went above and beyond what we typically see when 562 00:51:13,930 --> 00:51:19,570 And you add townhouses to a residential development in terms of managing their appearance. 563 00:51:20,850 --> 00:51:25,550 The two conditions that did not make it in, but the applicant intends to hold, again, 564 00:51:25,630 --> 00:51:28,270 those two conditions were a maximum development of 22 units. 565 00:51:29,010 --> 00:51:34,170 And then the other is to require no more than six individual townhomes per unit to 566 00:51:34,170 --> 00:51:36,270 avoid to address massing. 567 00:51:36,590 --> 00:51:43,490 Those two, while the developer is willing to offer them, likely to address concerns 568 00:51:43,490 --> 00:51:47,630 from the neighbors. I don't see those as so critical to this case. I think it's still consistent 569 00:51:47,630 --> 00:51:52,130 with the comprehensive plan without those two requirements that I'm comfortable making a motion 570 00:51:52,130 --> 00:52:01,330 to recommend approval of this case and also recognize that two additional conditions will 571 00:52:01,330 --> 00:52:06,150 be added before council. Thank you, Commissioner Miller. We have a motion to approve to have 572 00:52:14,430 --> 00:52:14,910 second. 573 00:52:18,950 --> 00:52:22,330 Commissioner O'Haver has seconded it. Do we have any additional discussion? 574 00:52:23,950 --> 00:52:28,410 I would just like to follow up on Commissioner Miller's comments. I do appreciate the applicant 575 00:52:29,230 --> 00:52:33,970 increasing the setback. I think that was one of my comments and anybody that attends these 576 00:52:33,970 --> 00:52:38,090 meetings regularly know that as part of my focus is existing single family homes. 577 00:52:38,370 --> 00:52:40,350 So I want to thank the applicant for that. 578 00:52:40,610 --> 00:52:43,310 I appreciate the height max, number of units, 579 00:52:43,450 --> 00:52:47,510 no more than six years again looking at the scale of the development. 580 00:52:48,430 --> 00:52:49,890 I hear the stormwater concerns. 581 00:52:50,990 --> 00:52:52,430 I'm looking at Google Maps. 582 00:52:52,950 --> 00:52:56,430 There's a lot of asphalt out there, a lot of concrete out there in those 583 00:52:56,430 --> 00:52:57,690 existing homes a lot. 584 00:52:58,410 --> 00:53:02,870 Looking at the concept plan, I just don't see the applicant 585 00:53:03,610 --> 00:53:08,710 must meet the city standards. I just don't see the storm water getting worse. I 586 00:53:08,710 --> 00:53:12,890 just want to say I hear the neighbors concerns but knowing what I know about 587 00:53:12,890 --> 00:53:17,370 storm water and looking at existing conditions I'm comfortable seconding and 588 00:53:17,370 --> 00:53:22,750 approving this application. Thank you Commissioner Haver. Any other 589 00:53:22,750 --> 00:53:29,990 discussion? All those in favor? All opposed. That's nine zero. 590 00:53:33,710 --> 00:53:34,490 Thank you very 591 00:53:34,490 --> 00:53:34,870 very much. 592 00:53:36,980 --> 00:53:38,640 Moving on to new business, 593 00:53:41,300 --> 00:53:44,840 we'll give the members of the public an opportunity 594 00:53:44,840 --> 00:53:47,380 to get situated. 595 00:53:57,320 --> 00:54:05,060 We have rezoning Z-1225 Peace and West Street. We'll turn to Mr. Clem for 596 00:54:05,060 --> 00:54:05,880 a full presentation. 597 00:54:09,450 --> 00:54:11,150 Good morning Planning Commission. Matthew 598 00:54:11,150 --> 00:54:17,410 Clem, Raleigh Planning and Development. Here to present Z-1225 for your review today. 599 00:54:17,410 --> 00:54:25,670 The request is to rezone 2.6 acres from industrial mix use for the 12-story height limit to downtown 600 00:54:25,670 --> 00:54:31,630 mix use with a 30-story height limit, an urban general frontage, and zoning conditions. 601 00:54:31,870 --> 00:54:35,550 Your deadline for action is October 11th. 602 00:54:35,750 --> 00:54:38,370 Just a quick look at the zoning map here. 603 00:54:39,370 --> 00:54:43,890 Doning in the area is predominantly industrial mix use, as the site is 604 00:54:43,890 --> 00:54:49,910 zoned, and downtown mix use to the south, which is the burgundy color on the 605 00:54:49,910 --> 00:54:56,790 screen. The northwest of the map is residential tin, including the Glenwood 606 00:54:56,790 --> 00:55:01,730 Brooklyn Streetside Historic Overlay District. Along P Street there's 607 00:55:01,730 --> 00:55:05,650 also some neighborhood mix use and commercial mix use as well. 608 00:55:07,700 --> 00:55:08,080 An aerial 609 00:55:08,080 --> 00:55:14,400 view of the site. You can see that the property fronts West Street MP streets highlighted in yellow. 610 00:55:15,200 --> 00:55:22,720 It's adjacent to a 14 acre site that will be the home of Smoky Hollow Park. 611 00:55:24,560 --> 00:55:30,100 So a new large future park in the area. Again, Glenwood Brooklyn to the west. 612 00:55:30,720 --> 00:55:35,840 You can see Smoky Hollow to the south. Capitol Boulevard cuts the map in half as well. Also 613 00:55:35,840 --> 00:55:45,620 to the east seaboard station. This is just a 3D view of the site, trying to highlight 614 00:55:45,620 --> 00:55:54,560 the difference in topography along the property between the future city park and the site, 615 00:55:56,100 --> 00:56:01,100 and also just a sense of what other buildings in the area are in terms of scale. So looking 616 00:56:01,100 --> 00:56:07,720 Looking at the site, this is from P Street, some existing structures there, and this is 617 00:56:07,720 --> 00:56:10,340 from West Street, two shots there. 618 00:56:12,180 --> 00:56:17,080 The number of zoning conditions, the first prohibits high-intensity uses, they're listed 619 00:56:17,080 --> 00:56:17,360 there. 620 00:56:17,880 --> 00:56:26,500 The second is related to building height, and there is an associated exhibit that 621 00:56:26,500 --> 00:56:27,500 is on our future slide. 622 00:56:27,500 --> 00:56:38,080 but the site is broken into two zones. Zone one is limited to 240 feet or 25 623 00:56:38,080 --> 00:56:44,580 stories. There's more detail on the exhibit slide. Zone two is limited to 624 00:56:45,960 --> 00:56:51,180 360 feet. Each of those zones have an additional 20 feet of building height 625 00:56:51,180 --> 00:56:56,420 depending on what the primary street is determined to be during site plan. 626 00:56:56,420 --> 00:56:59,940 And we can talk a little bit about that if there are questions. 627 00:57:01,520 --> 00:57:10,640 Condition number three addresses parking deck screening, condition four, five, and six are 628 00:57:10,640 --> 00:57:17,840 related to development of the property's edge to the east where the location of Smoky 629 00:57:17,840 --> 00:57:18,800 Hollow Park is planned. 630 00:57:19,340 --> 00:57:24,540 So there's a condition that prohibits surface parking between the park and the property, 631 00:57:24,540 --> 00:57:29,120 property, the future parking the property. There's a zoning condition that requires pedestrian 632 00:57:29,120 --> 00:57:38,260 connectivity from the rezoning site to that property and requires a urban plaza to be 633 00:57:38,260 --> 00:57:44,580 built as an amenity area adjacent to the park there as well. Office uses are limited 634 00:57:44,580 --> 00:57:52,760 to 500,000 square feet in any development. And then the final condition is a contribution 635 00:57:52,760 --> 00:57:58,080 to the city's affordable housing fund prior to the issuance of the fifth 636 00:57:58,080 --> 00:58:03,560 hundred unit for certificate of occupancy. So what that means is if the 637 00:58:03,560 --> 00:58:09,140 property is developed with 499 residential units no contribution to 638 00:58:09,140 --> 00:58:14,940 the affordable housing fund is made, if 500 or more are developed on the site 639 00:58:14,940 --> 00:58:20,620 then a $1.2 million contribution is made. So there's not a guarantee that 640 00:58:20,620 --> 00:58:28,700 the money would be given to the city for affordable housing unless more than 499 units are built. 641 00:58:28,860 --> 00:58:33,900 So this is the zoning condition exhibit regarding building height. 642 00:58:35,780 --> 00:58:39,120 So this is the property of P Street is here, West Street is here. 643 00:58:41,300 --> 00:58:43,060 And this is where the split is. 644 00:58:43,240 --> 00:58:49,000 So for zone one on the northern portion of the rezoning site, building height is limited 645 00:58:49,000 --> 00:59:00,440 it to 25 stories or limited to 240 feet in height. If at-site plan, P Street is determined 646 00:59:00,440 --> 00:59:08,180 to be the primary street, the 240 feet building height limit is actually 260 feet. Similarly 647 00:59:08,660 --> 00:59:17,580 for zone 2 towards the south, if the exhibit limits building height to 360 feet, but 648 00:59:17,580 --> 00:59:22,340 And if P Street is determined to be the primary street, it's actually 380 feet. 649 00:59:23,920 --> 00:59:28,300 So there's some variation in development outcomes based on the zoning exhibit. 650 00:59:29,240 --> 00:59:36,860 Just to try to map where that line is on the aerial view of the site, it's roughly located 651 00:59:36,860 --> 00:59:37,300 in this. 652 00:59:37,400 --> 00:59:41,940 This is not a surveyed map, but generally in that location. 653 00:59:43,320 --> 00:59:49,480 Looking at the proposed development intensity based on existing zoning and proposed zoning, 654 00:59:49,480 --> 00:59:56,680 You can see that the estimated residential yield increases... 655 01:00:00,000 --> 01:00:05,700 The office square footage goes down based on the zoning condition. So less office could be 656 01:00:05,700 --> 01:00:12,860 built under the proposed zoning than the existing zoning. And that has implications to traffic 657 01:00:12,860 --> 01:00:21,320 counts during AM and PM peak hours. So the office use is one of the higher trip-generating uses. 658 01:00:22,020 --> 01:00:27,320 So by reducing office below this threshold, the intent is that it would produce fewer 659 01:00:27,320 --> 01:00:34,920 trips compared to the existing zoning. Retail slightly goes up. And then of course, 92,000 660 01:00:34,920 --> 01:00:39,140 square feet are estimated to be able to be delivered under the existing zoning. The future 661 01:00:39,140 --> 01:00:49,360 zoning takes all industrial uses out of a development option. So by going from the 662 01:00:49,360 --> 01:00:54,560 industrial mixed use to the downtown mixed use, light industrial uses are not permitted 663 01:00:54,560 --> 01:01:00,400 on the site. So in terms of transportation and energy analysis, the site has a higher 664 01:01:00,400 --> 01:01:07,840 walk score, transit score, and bike score in the city average. The site is about a 20-minute 665 01:01:07,840 --> 01:01:13,680 walk from this room. So if you're living there, you can walk here in 20 minutes or an 8-minute 666 01:01:13,680 --> 01:01:19,400 bike ride. The site is served by the R line currently that is a frequent transit 667 01:01:19,400 --> 01:01:27,960 service that has a 15-minute frequency. It can also bring you downtown or to your work 668 01:01:27,960 --> 01:01:33,380 or wherever you're going. Higher transportation cost index than average. So what that means 669 01:01:33,380 --> 01:01:41,520 is folks who live in areas with higher transportation cost indexes spend less money on transportation 670 01:01:41,520 --> 01:01:46,880 costs because they have these other options, walking, biking, or taking transit. Or simply 671 01:01:46,880 --> 01:01:50,700 If they choose to drive, they're driving shorter distances, putting less miles in their 672 01:01:50,700 --> 01:01:52,720 car, requiring less maintenance over time. 673 01:01:53,860 --> 01:01:56,480 Transportation costs in the area are low. 674 01:01:58,220 --> 01:02:06,540 And the high job proximity index is related to the adjacency and inclusion in the downtown 675 01:02:06,540 --> 01:02:10,660 area, which is a high employment area for the city. 676 01:02:11,320 --> 01:02:16,520 So the site is served by several existing bus services, 1, 2, 6, 12 and the R line. 677 01:02:16,520 --> 01:02:17,540 you can see the site here. 678 01:02:21,520 --> 01:02:28,780 The request would add to the housing supply. It does not include subsidized 679 01:02:28,780 --> 01:02:34,520 units. Discussed earlier the contribution to the affordable housing fund if more than 499 680 01:02:34,520 --> 01:02:40,140 units are built. It does permit a variety of housing types, smaller units in the apartment type 681 01:02:40,140 --> 01:02:48,480 building. Again, we include walking distance of transit and the affordability analysis because 682 01:02:48,480 --> 01:02:53,680 because the cost of living is not just the cost for your housing, it is also the amount 683 01:02:53,680 --> 01:02:55,140 of money that you spend on transportation. 684 01:02:56,040 --> 01:02:59,900 So if you live in an area where you can spend less money on transportation, it means you 685 01:02:59,900 --> 01:03:00,880 have more money for other things. 686 01:03:04,970 --> 01:03:08,290 So affordability relies on transportation as well as the point. 687 01:03:09,810 --> 01:03:16,550 In terms of land use history, the property was platted into the city in 1885 and 688 01:03:16,550 --> 01:03:18,290 annexed in the early 20th century. 689 01:03:20,490 --> 01:03:27,230 The original deeds granted by the greater Raleigh Land 690 01:03:27,230 --> 01:03:32,730 Company in Glendalewood Subdivision prohibited occupation by persons of color. So there are 691 01:03:32,730 --> 01:03:39,230 historic incidents in the area of racial segregation. And also the 1960 Smoky Hollow 692 01:03:39,230 --> 01:03:46,870 redevelopment plan, an urban renewal project displaced a community and neighborhood of, 693 01:03:47,850 --> 01:03:54,270 according to a News and Observer article from 1960, 165 families from the Smoky Hollow neighborhood 694 01:03:54,910 --> 01:04:01,710 for the purposes of widening the street, the seaboard, underpass, and providing off-street 695 01:04:01,710 --> 01:04:02,250 car parking. 696 01:04:05,580 --> 01:04:07,500 The request is consistent with the Futureland 697 01:04:07,500 --> 01:04:14,200 use map. This is the future land use map on the right side of the screen. The future 698 01:04:14,200 --> 01:04:20,980 land use map designation is central business district, which is the maroon color. You can 699 01:04:20,980 --> 01:04:24,960 also see adjacent to our public park planning. 700 01:04:28,160 --> 01:04:30,700 The request is also consistent with the urban 701 01:04:30,700 --> 01:04:40,180 form map. The urban form map functions to recommend certain frontage types. So the urban 702 01:04:40,180 --> 01:04:46,600 general frontage is consistent with that. This slide and map say a lot more about the case 703 01:04:46,600 --> 01:04:52,840 other than just the frontage as well. We know that building height is the primary 704 01:04:52,840 --> 01:04:57,840 issue under consideration here. We know that from hearing and working and speaking 705 01:04:57,840 --> 01:05:06,480 with the community. That building height is the issue to be considered. Recommended building 706 01:05:06,480 --> 01:05:14,500 heights in the comprehensive plan come from a table called LU2 recommended building heights. 707 01:05:15,180 --> 01:05:20,720 And that table functions with the future land use map in different contexts in the city 708 01:05:21,320 --> 01:05:25,980 to provide recommended building heights. There are essentially two qualifying criteria 709 01:05:25,980 --> 01:05:33,900 criteria for what is called the core transit designation on that table. One criteria is 710 01:05:33,900 --> 01:05:39,980 being cited on a corridor that is planned or programmed for frequent transit. The site 711 01:05:39,980 --> 01:05:45,640 is currently served by frequent transit with the R line service. So it qualifies for the 712 01:05:45,640 --> 01:05:52,520 transit aspect of the core transit designation. The other aspect of the core transit designation 713 01:05:52,520 --> 01:05:58,900 is being in the core of a mixed-use center of 30 acres or greater. You can see 714 01:05:58,900 --> 01:06:04,550 that the site is contained in downtown. The site is contained in the bus rapid 715 01:06:04,550 --> 01:06:08,070 transit area which is shown on the map and beyond the bus rapid transit area 716 01:06:08,070 --> 01:06:14,230 is the frequent transit area. So taken together this is in the core of those 717 01:06:14,230 --> 01:06:21,070 districts. The downtown designation on the urban form map follows the 718 01:06:21,070 --> 01:06:27,710 boundaries of downtown. The bus rapid transit area is within a quarter mile of 719 01:06:29,250 --> 01:06:34,130 corridors planned for bus rapid transit. So in this case would be capital 720 01:06:34,130 --> 01:06:42,050 Boulevard for the capital Boulevard North Study. This distance is roughly 721 01:06:42,050 --> 01:06:48,010 half a mile. And then beyond that the frequent transit area is a half mile 722 01:06:48,010 --> 01:06:54,290 from Capital Boulevard. So the site is core transit by the qualifying 723 01:06:54,290 --> 01:06:58,350 conditions of being currently served by transit, the R lines, the frequent transit 724 01:06:58,350 --> 01:07:03,790 service, and within a mixed-use center 30 acres or greater. The request is 725 01:07:03,790 --> 01:07:08,250 consistent with the future land use map and the urban form map. There are a 726 01:07:08,250 --> 01:07:11,810 number of policies that the request is consistent with in the comprehensive 727 01:07:11,810 --> 01:07:17,890 plan, capitalizing on transit access, station area land uses related to the 728 01:07:17,890 --> 01:07:21,990 bus rapid transit planning in the area, compact development, healthy communities. 729 01:07:23,490 --> 01:07:27,770 Being in the location that it is, folks are more likely to walk, bike, or take 730 01:07:27,770 --> 01:07:36,420 transit, active mobility to satisfy transportation needs. And so walking and 731 01:07:36,420 --> 01:07:42,400 biking, living next to a park, those are healthy things for folks to do. 732 01:07:45,060 --> 01:07:50,620 station area recommended heights. So there is a planned bus rapid transit 733 01:07:50,620 --> 01:07:57,040 station in the area. We have transit staff to talk particularly about where 734 01:07:57,040 --> 01:08:02,300 that transit station will be located. At the time that the current urban form 735 01:08:02,300 --> 01:08:06,860 map was adopted the transit station location was at the corner of West and 736 01:08:06,860 --> 01:08:12,260 Johnson Street. That's also reflected on the urban form map with the quarter 737 01:08:12,260 --> 01:08:19,020 mile buffer for the BRT transit station. The current planning and location for the 738 01:08:19,020 --> 01:08:24,840 that transit station has moved a few blocks to the east and is now planned 739 01:08:24,840 --> 01:08:32,880 to be located on Capitol Boulevard and between Peace and Johnson. And so the 740 01:08:32,880 --> 01:08:38,970 site is within a quarter mile of that area as well. Downtown edges and 741 01:08:38,970 --> 01:08:39,750 downtown transitions. 742 01:08:42,150 --> 01:08:46,150 The zoning conditions provided by the applicant 743 01:08:46,150 --> 01:08:54,930 to limit building height in feet transitions the mass 744 01:08:54,930 --> 01:08:59,790 of the sites down to the other lower slung development 745 01:08:59,790 --> 01:09:00,570 in the area. 746 01:09:02,530 --> 01:09:03,370 And 747 01:09:06,950 --> 01:09:09,370 again, downtown for high density 748 01:09:09,370 --> 01:09:11,910 for all the reasons of walkability and job access 749 01:09:11,910 --> 01:09:19,430 transit access are consistent. There are no inconsistent policies identified for 750 01:09:19,430 --> 01:09:23,470 the rezoning request. There are no outstanding issues and your deadline 751 01:09:23,470 --> 01:09:28,070 for action is October 11th. The applicants are here. They'll give their 752 01:09:28,070 --> 01:09:33,090 presentation and we can answer your questions following that. Thank you, 753 01:09:33,170 --> 01:09:38,010 Matt. Next we'll turn to public comment. The applicant and those in 754 01:09:38,010 --> 01:09:39,470 support. We'll have 10 minutes. 755 01:09:50,850 --> 01:09:52,490 Good morning, Chair, members of the Planning 756 01:09:52,490 --> 01:09:55,710 Commission, Jason Barenworth, Morningstar Law Group. Excited to be here today on 757 01:09:55,710 --> 01:09:59,390 behalf of Rally Development Company, who's the proposed developer of this site. 758 01:09:59,930 --> 01:10:03,210 I really want to hit on a handful of high points associated with the case. I 759 01:10:03,210 --> 01:10:05,890 think the staff report and the staff's presentation has really done an 760 01:10:05,890 --> 01:10:09,030 excellent job of analyzing the applicability of the comprehensive 761 01:10:09,030 --> 01:10:11,690 plan. And I'm going to talk on a couple of things associated with that, 762 01:10:11,810 --> 01:10:16,070 but really there are three overarching themes related to this case. First, 763 01:10:16,070 --> 01:10:20,250 it's the right use in the right location. That's what we're always trying to do with respect to 764 01:10:20,250 --> 01:10:24,890 when we're rezoning and when we want development to go into a place, is it the right use in 765 01:10:24,890 --> 01:10:29,710 the right location? And we submit that this is second, as was mentioned in the staff presentation 766 01:10:29,710 --> 01:10:36,830 and the staff support plan, there is no doubt that this case is consistent with the comprehensive 767 01:10:36,830 --> 01:10:40,330 plan. Unfortunately, there's a lot of misinformation that's out in the public 768 01:10:41,150 --> 01:10:45,070 related to comprehensive plan policies that speak to this case, but there can be no 769 01:10:45,070 --> 01:10:49,610 mistake that this case is consistent with the city's adopted comprehensive plan. 770 01:10:50,130 --> 01:10:51,910 And third, we have appropriate transitions. 771 01:10:52,250 --> 01:10:56,730 This case is actually providing the types of transitions that will ensure that there 772 01:10:56,730 --> 01:11:02,210 is context-sensitive transitions to existing neighborhoods while also maintaining the integrity 773 01:11:02,210 --> 01:11:06,730 of the comprehensive plan that is so important to making sure that Raleigh can continue 774 01:11:06,730 --> 01:11:10,790 to grow and continue to grow in a way that discourages sprawl and encourages 775 01:11:10,790 --> 01:11:13,950 the type of infill development that we're looking at in this case. 776 01:11:13,950 --> 01:11:18,030 And so, a little bit about the right use and the right location. 777 01:11:18,170 --> 01:11:19,790 I do want to highlight a handful of things. 778 01:11:19,930 --> 01:11:22,430 This is a layout that we have in our presentation. 779 01:11:22,990 --> 01:11:25,590 This is the current planning associated with the development. 780 01:11:26,730 --> 01:11:30,890 This is the site kind of in this location here if you can follow my cursor. 781 01:11:32,890 --> 01:11:36,870 And as was mentioned, what we have proposed, what the applicant has proposed, 782 01:11:37,150 --> 01:11:40,250 is a step down from 30 stories to 25 stories. 783 01:11:40,250 --> 01:11:44,630 In addition to that, there are height restrictions associated with that to ensure that nothing 784 01:11:44,630 --> 01:11:50,570 greater than 360 feet will be developed adjacent to P Street and nothing greater than 240 feet 785 01:11:50,570 --> 01:11:54,970 will be developed along the northern portion of the site. Again, trying to provide those 786 01:11:54,970 --> 01:12:00,650 appropriate transitions. As we all know, the city is investing a lot of money in Smokey 787 01:12:00,650 --> 01:12:04,570 Hollow Park. It's going to be a tremendous amenity to this development. A lot of planning 788 01:12:04,570 --> 01:12:09,390 has gone into this site by Raleigh Development Company to make sure that when this site 789 01:12:09,390 --> 01:12:13,870 develops, it appropriately addresses and embraces the park. As a critical 790 01:12:13,870 --> 01:12:17,390 amenity, a critical feature in ensuring that folks who live here, folks who are 791 01:12:17,390 --> 01:12:21,190 going to be dining here have great access to that park. Additionally, as 792 01:12:21,190 --> 01:12:25,790 you're aware, across the street is Publix. I live in downtown Raleigh. Having 793 01:12:25,790 --> 01:12:30,470 walking availability to groceries is an incredible amenity to a site like 794 01:12:30,470 --> 01:12:33,990 this. Again, it's where you want to put people. It discourages auto 795 01:12:33,990 --> 01:12:37,550 dependency. It gets people out. They're allowed to walk and that a lot of 796 01:12:37,550 --> 01:12:38,450 that's already happening. 797 01:12:38,830 --> 01:12:40,730 And this is why we think density is appropriate 798 01:12:40,730 --> 01:12:41,450 in this location. 799 01:12:41,990 --> 01:12:44,450 It's also walkable to a lot of the other amenities 800 01:12:44,450 --> 01:12:46,090 that are developing in this area. 801 01:12:46,390 --> 01:12:49,710 And finally, as was mentioned, related to future transit, 802 01:12:49,830 --> 01:12:51,110 there's existing transit stops. 803 01:12:51,330 --> 01:12:53,970 It's in a frequent transit area as of today 804 01:12:53,970 --> 01:12:56,270 with the bus routes, the multitude of bus routes 805 01:12:56,270 --> 01:12:57,430 within proximity to the site. 806 01:12:57,590 --> 01:13:00,190 And there's future plan transit in this area 807 01:13:00,190 --> 01:13:01,970 that we believe all of those things 808 01:13:01,970 --> 01:13:03,030 kind of coming together. 809 01:13:03,290 --> 01:13:06,330 It's really incumbent upon achieving the goals 810 01:13:06,330 --> 01:13:11,030 of the comprehensive plan. With respect to the comprehensive plan, and so this is just 811 01:13:11,030 --> 01:13:15,050 a little bit more of the urban place making that's being provided. This is that break 812 01:13:15,050 --> 01:13:20,710 in the building, so this is kind of facing south. This is the larger 30 story portion, 813 01:13:21,170 --> 01:13:26,590 and then the 25 story portion here, and then this does a little bit job of kind of giving 814 01:13:26,590 --> 01:13:29,790 you a little bit of the scale. And so this is the current thinking, the current planning 815 01:13:29,790 --> 01:13:34,490 associated with this site, and this is the building up along peace. They're currently 816 01:13:34,490 --> 01:13:39,170 planning for a break in the building with this pedestrian promenade and a featured stair 817 01:13:39,170 --> 01:13:44,790 and you can again you can see the way that the park is really being embraced by this development. 818 01:13:44,930 --> 01:13:49,310 They're being very very intentional about making sure that what gets developed here 819 01:13:49,310 --> 01:13:54,210 is highly complementary to what the city is doing with the park. I'm going to move through 820 01:13:54,210 --> 01:13:58,110 the comprehensive plan as quickly as possible recognizing we don't have a lot of time and 821 01:13:58,110 --> 01:14:01,870 I've got a couple other speakers but there is no doubt it's in the central business 822 01:14:01,870 --> 01:14:07,090 district, it's in the downtown center area, it's in a transit station area. All of these 823 01:14:07,090 --> 01:14:11,430 things speak directly to the fact that this is where the Comprehensive Plan is already 824 01:14:11,430 --> 01:14:15,850 calling for density. In fact, if you look at those Comprehensive Plan maps, those Comprehensive 825 01:14:15,850 --> 01:14:21,290 Plan maps call for up to potentially 40 stories. And again, why we believe this is appropriately 826 01:14:21,290 --> 01:14:25,470 transitioned because instead of asking for 40 stories, which is across the street, 827 01:14:25,790 --> 01:14:29,390 you may be familiar, caddy corner to this site, next to the public, there's 828 01:14:29,390 --> 01:14:34,150 a site that is zoned for 40 stories as of today. Why we believe it is appropriately 829 01:14:34,150 --> 01:14:39,590 transitioned because what is being achieved here is taking that otherwise 40 story recommendation, 830 01:14:39,950 --> 01:14:44,990 making it context sensitive, stepping the building down to 30 into 25 stories as you 831 01:14:44,990 --> 01:14:49,950 make your way north on the site. Again, a little bit more about the transit station 832 01:14:49,950 --> 01:14:53,750 areas and I know this is a lot of information to cover in a short span of time so I apologize. 833 01:14:53,750 --> 01:14:56,950 But as was mentioned in the staff report this isn't 834 01:15:00,000 --> 01:15:04,560 We are developing as directly on top of one of those future transit station maps, future 835 01:15:04,560 --> 01:15:09,560 transit station areas. This map and all of these things are directly from the comprehensive 836 01:15:09,560 --> 01:15:14,680 plan. It talks about the station area types. This is a downtown station area type adjacent 837 01:15:14,680 --> 01:15:20,120 to the site. And those downtown recommendations call for up to 40 stories or more. I would 838 01:15:20,120 --> 01:15:23,460 note for you that I think it's important as it relates to your review of this case. 839 01:15:23,860 --> 01:15:28,460 One of the things that's clear in the recommendations associated with transit areas is that where 840 01:15:28,460 --> 01:15:31,360 where there's a discrepancy, and this is in the land use plan, this is in the comprehensive 841 01:15:31,360 --> 01:15:36,340 plan, where there's a discrepancy in building height relative to transit areas in any other 842 01:15:36,340 --> 01:15:41,440 map that the city has, those transit areas control that is expressly provided for in the 843 01:15:41,440 --> 01:15:42,160 comprehensive plan. 844 01:15:42,300 --> 01:15:46,520 And again, I recognize that building height is the centerpiece of this development, 845 01:15:46,740 --> 01:15:51,000 and I would tell you unequivocally that this development is satisfying the comprehensive 846 01:15:51,000 --> 01:15:54,980 plan's goals with respect to building height and is doing so in a way that will breathe 847 01:15:54,980 --> 01:15:56,840 life into those future transit plans. 848 01:15:56,840 --> 01:16:02,520 And so with that, I'm going to turn it over to a couple of our speakers and we'll be here to answer questions. 849 01:16:10,640 --> 01:16:16,980 Good morning Planning Commission. My name is Larry Miller. I'm President of Glenwood South's Neighborhood Collaborative. 850 01:16:17,660 --> 01:16:21,720 We're an association, Neighborhood Association has over a thousand members. 851 01:16:22,540 --> 01:16:32,420 We have 14 member board that made up of members of residents and business owners in the community. 852 01:16:32,420 --> 01:16:41,320 And we're actually a community that is adjacent to this site, unlike the Glenwood Brooklyn 853 01:16:41,320 --> 01:16:47,840 neighborhood which is physically separated from the proposed site by a railroad track. 854 01:16:48,680 --> 01:16:53,180 But we thought it was important to show our support for this development. 855 01:16:54,660 --> 01:16:56,960 First of all, I'm trying to be brief. 856 01:16:56,960 --> 01:17:03,500 I want to say the planning and development staff has done an outstanding job in presenting 857 01:17:03,500 --> 01:17:07,060 this and I think you should pay attention to what they have to say. 858 01:17:07,120 --> 01:17:07,940 They're your experts. 859 01:17:08,340 --> 01:17:14,160 I'm not going to go into the minutiae, but just note that they do indicate that it's 860 01:17:14,160 --> 01:17:20,480 consistent with the comprehensive plan, future land use, infrastructure, urban form. 861 01:17:20,840 --> 01:17:22,660 I mean, they don't find anything wrong with it. 862 01:17:23,940 --> 01:17:29,740 I'm going to just talk about a few of the factors that we think are important 863 01:17:29,740 --> 01:17:36,400 and that you should be looking at in the overall public interest for this project 864 01:17:36,400 --> 01:17:41,160 and not the private interest of a few vocal opposition. 865 01:17:42,600 --> 01:17:46,180 The transportation, it's a walkable neighborhood. 866 01:17:46,180 --> 01:17:53,560 We live in the neighborhood. It's great. You want to have a dense development like this 867 01:17:53,560 --> 01:17:59,260 in a neighborhood that's walkable. You've got pedestrian transportation. You have the bus rapid transit, 868 01:18:00,300 --> 01:18:06,360 the frequent transit. Those have all been talked about. It's also on a bike trail. 869 01:18:06,920 --> 01:18:11,520 It's going to be added on West Street scooters. You've got all that. 870 01:18:11,520 --> 01:18:17,920 You have all that transportation, which will eliminate the use of the need for cars. 871 01:18:18,580 --> 01:18:22,120 So that's a strong factor in its favor. 872 01:18:22,760 --> 01:18:25,120 Again, it's adjacent to the Smoky Hollow Park. 873 01:18:25,560 --> 01:18:28,820 It will allow access to the park from West Street. 874 01:18:28,920 --> 01:18:31,480 Right now, the park is surrounded by property. 875 01:18:31,920 --> 01:18:35,700 The only access the city is going to have is from P Street, which is problematic. 876 01:18:35,700 --> 01:18:42,720 This will create an additional access to this great park amenity that's going to be built. 877 01:18:45,100 --> 01:18:52,680 The affordable housing part of this, the city is all, that's one of the main issues in Raleigh 878 01:18:52,680 --> 01:18:53,540 is affordable housing. 879 01:18:54,200 --> 01:19:00,780 This is going to provide over a million dollars to put for affordable housing. 880 01:19:02,540 --> 01:19:06,900 Again, it is a factor that should be taken into consideration. 881 01:19:07,480 --> 01:19:09,800 I'm going to leave some time for another person. 882 01:19:10,060 --> 01:19:17,920 I just want to say please look forward to the overall public interest and not the private interests of a few individuals. 883 01:19:18,140 --> 01:19:18,580 Thank you. 884 01:19:28,460 --> 01:19:31,660 If I may, may I ask for an additional time? 885 01:19:31,820 --> 01:19:35,720 I've got about 25 seconds in a time where I would love three minutes if that's allowable. 886 01:19:35,720 --> 01:19:36,340 If 887 01:19:38,680 --> 01:19:41,360 it's the will of the commission, I will add two minutes. 888 01:19:42,260 --> 01:19:45,020 And then I will add two minutes to the other side as well. 889 01:19:45,800 --> 01:19:46,080 Great. 890 01:19:46,360 --> 01:19:46,500 Thank you. 891 01:19:46,940 --> 01:19:48,320 Without objection, we'll add two minutes. 892 01:19:48,760 --> 01:19:49,040 Thank you. 893 01:19:49,540 --> 01:19:50,320 My name is Will Choi. 894 01:19:50,520 --> 01:19:51,600 I'm an architect in Raleigh. 895 01:19:51,660 --> 01:19:53,640 I've been practicing for about 20 years. 896 01:19:54,000 --> 01:19:55,400 I hold a master's degree in architecture 897 01:19:55,400 --> 01:19:56,460 from Harvard University. 898 01:19:56,460 --> 01:20:00,320 And I've practiced in several cities across the country 899 01:20:00,320 --> 01:20:02,300 designing buildings like this and executing them. 900 01:20:02,300 --> 01:20:04,600 Though now my work these days in Raleigh 901 01:20:04,600 --> 01:20:09,500 focus on much smaller neighborhood projects and I come here in support of 902 01:20:09,500 --> 01:20:15,560 the project today. Now there are a great many local issues in need of grassroots 903 01:20:15,560 --> 01:20:19,780 involvement these days in Raleigh. Issues that I believe everybody in this 904 01:20:19,780 --> 01:20:25,840 room would agree our city needs solutions for. Real issues like housing 905 01:20:25,840 --> 01:20:31,960 affordability, mass transit, downtown safety, our city's environment, 906 01:20:34,210 --> 01:20:34,980 so it 907 01:20:34,980 --> 01:20:41,080 pretty odd when one takes time off work to speak here instead in support of a 908 01:20:41,080 --> 01:20:45,880 rezoning that will supposedly only benefit some private company. But I'm 909 01:20:45,880 --> 01:20:49,640 here because I believe density is a necessary component in improving these 910 01:20:49,640 --> 01:20:57,900 larger issues I mentioned earlier. If that sounds absurd let me ask, how can 911 01:20:57,900 --> 01:21:03,280 we address housing shortage without increasing the supply of housing? How 912 01:21:03,280 --> 01:21:07,980 How can we establish mass transit without the mass of people who will write it? 913 01:21:08,860 --> 01:21:14,120 How can we increase safety in downtown without any eyes or foot traffic on the streets? 914 01:21:15,180 --> 01:21:20,700 Density is a crucial ingredient in making Raleigh liveable for people like me and the 915 01:21:20,700 --> 01:21:25,140 thousands of nearby apartment dwellers who did not feel compelled to come out and oppose 916 01:21:25,140 --> 01:21:25,880 the rezoning today. 917 01:21:27,100 --> 01:21:29,360 Most folks downtown will readily agree. 918 01:21:29,360 --> 01:21:35,560 we need things like sidewalks, bike lanes, beautiful parks to make our city livable. 919 01:21:36,800 --> 01:21:41,760 But without density, our sidewalks and bike lanes will continue to remain empty, 920 01:21:42,120 --> 01:21:46,940 our parking lots larger than the parks we build them for, and we will continue to 921 01:21:46,940 --> 01:21:52,500 cosplay a city rather than actually becoming one. We cannot say we care about 922 01:21:52,500 --> 01:21:56,380 our environment, public transit, walkability, or housing, and then turn 923 01:21:56,380 --> 01:22:01,500 around to reject density. That's about as ridiculous as saying that you love to swim 924 01:22:01,500 --> 01:22:07,140 just not when the water is wet. And I hear the voices saying, hey, that's all fine, just 925 01:22:07,140 --> 01:22:11,820 not right here next to all these houses. Yet, last I checked, this neighborhood is a single 926 01:22:11,820 --> 01:22:17,040 densest neighborhood in all of Raleigh and outside of Charlotte, it is a densest spot 927 01:22:17,040 --> 01:22:18,600 in the entire state of North Carolina. 928 01:22:18,980 --> 01:22:19,940 Thank you for your comments. 929 01:22:19,940 --> 01:22:25,900 So I asked if density isn't appropriate here. Where in Raleigh is this magically 930 01:22:25,900 --> 01:22:29,520 better spot that's not near any single family homes. Thank you. 931 01:22:31,760 --> 01:22:33,060 Next we will hear 932 01:22:33,060 --> 01:22:36,420 from the opposition. You have a total of 12 minutes. 933 01:22:38,830 --> 01:22:40,410 Please state your name for 934 01:22:40,410 --> 01:22:46,090 the record. My name is Tim Niles and thank you for allowing me to speak. 935 01:22:46,470 --> 01:22:50,630 Respectfully, I am disappointed this hearing is being held today when the 936 01:22:50,630 --> 01:22:55,370 public has only had access to the staff report since Friday and that was 937 01:22:55,370 --> 01:22:59,830 made aware, and the staff was made aware over a month ago that the advocate for the neighbors 938 01:22:59,830 --> 01:23:04,950 could not be here today. The presentation he submitted to this body was prepared prior 939 01:23:04,950 --> 01:23:09,470 to the staff report being made available. Because of this, it does not address the 940 01:23:09,470 --> 01:23:14,530 latest assertions. I'm concerned that both neighborhood meetings were held without access 941 01:23:14,530 --> 01:23:20,570 to the staff report. Lastly, I note that two years ago, Transportation reported that 942 01:23:20,570 --> 01:23:26,350 this location had been removed from consideration as a transit location. The issue was brought 943 01:23:26,350 --> 01:23:30,730 up at the first neighborhood meeting because the applicant claimed the location is a transit 944 01:23:30,730 --> 01:23:36,450 location based on an out-of-date map, and every part of their application relies on 945 01:23:36,450 --> 01:23:42,530 that designation. Without it, this proposal violates over 40 policies and plans. I 946 01:23:42,530 --> 01:23:46,010 was told by planning staff at the end of that April meeting that they would get 947 01:23:46,010 --> 01:23:51,910 clarification on the issue, they never got back to me. Transportation staff did reconfirm 948 01:23:51,910 --> 01:23:58,410 by email in April that the location has not been identified as a transit station. Now magically 949 01:23:58,410 --> 01:24:04,070 when the staff report comes out, West Street is once again identified as a transit location. 950 01:24:04,550 --> 01:24:09,050 This seems like a conveniently timed revelation when no one from the city was willing to 951 01:24:09,050 --> 01:24:15,030 disclose this information to the public previously. Even when asked directly about it at both 952 01:24:15,030 --> 01:24:20,710 the first and second neighborhood meetings in April and July. It gives the impression the fix is in. 953 01:24:21,630 --> 01:24:29,110 Lastly, stepping down from 25 stories to two cannot realistically be called a transition. 954 01:24:29,690 --> 01:24:35,470 It's laughable. Nearly 1,500 people have signed a change.org petition against this proposal 955 01:24:35,470 --> 01:24:38,410 and more are signing it every day. Thank you. 956 01:24:41,660 --> 01:24:42,920 Good morning, ladies and gentlemen, 957 01:24:42,920 --> 01:24:49,540 Chris Crew 306 Elm Street. This is not the right use in the right location because it's not 958 01:24:49,540 --> 01:24:55,180 consistent with the zoning. That's just pure and simple there. A lot of the people in this room 959 01:24:55,180 --> 01:24:59,800 participated in the development and adoption of Raleigh's comprehensive plan, the UDO, 960 01:25:00,480 --> 01:25:04,680 and a lot of them are passionate about the preservation and care of our unique historic 961 01:25:04,680 --> 01:25:10,820 architecture and cultural history. Local zoning is a tool that allows us to do this 962 01:25:10,820 --> 01:25:15,380 preservation because we've invested so much in developing and implementing these tools 963 01:25:15,380 --> 01:25:22,280 of being proper to grant a spot zoning privilege like the concessions now being requested on 964 01:25:22,280 --> 01:25:24,920 a property that has already been re-zoned. 965 01:25:25,320 --> 01:25:26,200 Look at the map. 966 01:25:26,480 --> 01:25:31,080 The approval of this request would create a perverse and incompatibly irregularity 967 01:25:31,080 --> 01:25:33,640 in the boundaries laid out in the zoning map. 968 01:25:34,280 --> 01:25:35,580 It's just not right. 969 01:25:35,580 --> 01:25:42,900 As far as people being opposed to this, I have a message here from the Society for the 970 01:25:42,900 --> 01:25:48,740 Preservation of Historic Oakwood, which I believe was delivered to you by e-mail last week. 971 01:25:49,710 --> 01:25:52,300 If you did not receive it, I'll be sure that you did. 972 01:25:52,740 --> 01:25:56,400 That's an organization with over 1,600 members. 973 01:25:56,660 --> 01:26:03,000 Their Board of Directors voted to oppose this on a number of grounds, first of all, 974 01:26:03,000 --> 01:26:08,540 allowing a 30-story mixed-use building within 240 feet of a residential neighborhood with 975 01:26:08,540 --> 01:26:15,220 an HOD designation represents an adverse impact that has not been addressed by anything we've 976 01:26:15,220 --> 01:26:20,360 heard here. In the absence of detailed and specific design information, it's impossible 977 01:26:20,360 --> 01:26:28,420 to judge that this development will be compatible with Section 3.5.5C of the UDO dealing with 978 01:26:28,420 --> 01:26:34,300 setbacks. Beyond the questionable compatibility, the approval of this would set the President 979 01:26:34,300 --> 01:26:40,980 that 30-story buildings just 240 feet from historic homes is not only allowed, but is 980 01:26:40,980 --> 01:26:46,560 fully consistent with the 2030 Comprehensive Plan and its policies, which this request 981 01:26:46,560 --> 01:26:52,640 is not consistent with. And in addition to these easily recognized impacts, there 982 01:26:52,640 --> 01:26:57,560 were unexamined impacts on traffic, public safety, and public utilities. Did any of you 983 01:26:57,560 --> 01:27:01,920 note the flooding down there at the end of West Street yesterday. As a retired 984 01:27:01,920 --> 01:27:07,140 emergency manager, that gives me pause. We urge you to reject this proposal on 985 01:27:07,140 --> 01:27:11,180 the grounds that it is arbitrary, capricious, and represents an example of 986 01:27:11,180 --> 01:27:15,580 spot zoning that conflicts with the UDO and the comprehensive plan. Thank you. 987 01:27:19,660 --> 01:27:23,880 Good morning. Matthew Brown, 401 North Person Street. Thank you for your 988 01:27:23,880 --> 01:27:28,240 service. Thank you for letting me speak. We're talking about what Raleigh 989 01:27:28,240 --> 01:27:37,300 needs. Unlike most cities our size, Raleigh has no historic riverfront or lakefront or 990 01:27:37,300 --> 01:27:43,900 mountains or Beale Street or other cultural attractions or Biltmore House or other architectural 991 01:27:43,900 --> 01:27:51,820 monuments. We need interest. We need beauty. We need character. That is what these historic 992 01:27:51,820 --> 01:27:57,080 districts provide to all the citizens of Raleigh and all the tourists. And that 993 01:27:57,080 --> 01:28:05,420 That is why our UDA, UDO protects them, and a comprehensive plan envisions a transition 994 01:28:05,420 --> 01:28:05,820 zone. 995 01:28:06,260 --> 01:28:07,560 It's zone for 12 stories. 996 01:28:07,880 --> 01:28:08,360 That's dense. 997 01:28:08,800 --> 01:28:11,100 That's just like the public's building across the street. 998 01:28:12,000 --> 01:28:18,640 But 30 stories next to two-story historic neighborhood violates the rule of common 999 01:28:18,640 --> 01:28:19,040 sense. 1000 01:28:20,220 --> 01:28:26,140 And another thing, he's talking about, oh, transit's not a problem because it's right 1001 01:28:26,140 --> 01:28:32,100 by a capital boulevard. The problem is not north-south, it's east-west. Peace Street is 1002 01:28:32,100 --> 01:28:37,940 a bottleneck because of the two sets of railroad tracks and the state government mall. And part 1003 01:28:37,940 --> 01:28:42,420 of it is only two lanes. The traffic is already horrendous. All these people will have cars. 1004 01:28:43,080 --> 01:28:48,000 The next street, east-west street north of this that crosses both sets of railroad tracks 1005 01:28:48,560 --> 01:28:56,060 is the Belt Line. That's why it's a bottleneck. And the city has already approved all this 1006 01:28:56,060 --> 01:29:03,560 high density development along there, a caddy corner to this, a skyscraper, two skyscrapers 1007 01:29:03,560 --> 01:29:08,840 at seaboard. When all these things are full, there will be constant gridlock on P Street 1008 01:29:08,840 --> 01:29:14,460 and everybody will say, where were our planners? How could they let this happen? This is crazy. 1009 01:29:15,420 --> 01:29:22,300 There's tons of wonderful places to put a 30 story building. On this overloaded street 1010 01:29:22,300 --> 01:29:26,540 Next to this historic treasure is not the place. Thank you. 1011 01:29:31,020 --> 01:29:36,100 Good morning. My name is Gaston Williams and clearly I'm not Esther Hall. She's away on family business. 1012 01:29:36,520 --> 01:29:42,760 But I am a member of the Preservation Raleigh Inc., a newly created preservation advocacy group in Raleigh. 1013 01:29:43,140 --> 01:29:46,600 And we're opposed to the zoning request as submitted. 1014 01:29:47,400 --> 01:29:51,940 We haven't had a chance to look at all the details because they were recently released. 1015 01:29:51,940 --> 01:29:56,720 but we believe that allowing the construction of what could be a 30-story 1016 01:30:00,000 --> 01:30:07,700 A residential neighborhood designated as a historic overlay district significantly impacts that 1017 01:30:07,700 --> 01:30:14,960 historic district. We're concerned with the lack that given the fact that this site is partially 1018 01:30:14,960 --> 01:30:21,520 elevated and the height is so important that maybe in this case too much is too much. 1019 01:30:22,160 --> 01:30:27,820 This represents an urban wall that's going to be erected and without a lot of detail 1020 01:30:27,820 --> 01:30:32,080 and fully comprehend it. Excuse me, I'm sorry. Could I please ask that we silence our phones? 1021 01:30:35,560 --> 01:30:37,020 Madam Chairman, it wasn't me this time. 1022 01:30:39,240 --> 01:30:43,600 Without your getting and demanding actually, a real 1023 01:30:43,600 --> 01:30:49,180 detailed topography understanding what this represents from the perspective of not just 1024 01:30:49,180 --> 01:30:54,360 the buildings around it, but also the neighborhood above it, and also what it means to the 1025 01:30:54,360 --> 01:31:00,720 park and everything else. We don't think that this should be approved without a great 1026 01:31:00,720 --> 01:31:05,640 deal of study about the topography and the relative scale, and that cannot be accomplished 1027 01:31:05,640 --> 01:31:13,140 by one-dimensional drawings that you often get in these situations. More broadly, we 1028 01:31:13,140 --> 01:31:18,940 question whether this is really consistent with the comprehensive plan, suggesting that 1029 01:31:18,940 --> 01:31:25,080 that this sets a great precedent for many historic neighborhoods in the area that could 1030 01:31:25,080 --> 01:31:32,920 result in a destruction or diminution of the historic districts. The consequences for long-term 1031 01:31:32,920 --> 01:31:38,020 residents of these areas are great. We're going to have profound overwhelming building 1032 01:31:38,020 --> 01:31:46,180 scale increases traffic, noise, sunlight, glare, and as frequently pointed out, the traffic 1033 01:31:46,180 --> 01:31:51,120 traffic problem is going to be, as mentioned, the number of units in here, it's going to 1034 01:31:51,120 --> 01:31:55,740 be a real artful day to get through P Street with all the traffic that's going to be dumped 1035 01:31:55,740 --> 01:31:56,660 into P Street. 1036 01:31:57,740 --> 01:32:07,280 So we believe this proposal for a high density project on the core of the historic area 1037 01:32:07,280 --> 01:32:13,120 largely residential represents the possibility of being argued in the future to diminish 1038 01:32:13,120 --> 01:32:13,980 other neighborhoods. 1039 01:32:13,980 --> 01:32:19,020 We urge the Planning Commission to request more detail before approving it or otherwise 1040 01:32:19,540 --> 01:32:21,480 reject this proposal as it's submitted. 1041 01:32:22,020 --> 01:32:22,560 Thank you. 1042 01:32:22,900 --> 01:32:23,240 Thank you. 1043 01:32:23,700 --> 01:32:25,620 Just real quick, not on my time. 1044 01:32:25,820 --> 01:32:26,360 Thank you all. 1045 01:32:26,600 --> 01:32:30,020 I've been in a situation along with Esther where you all are sitting and devoting your 1046 01:32:30,020 --> 01:32:30,860 time to this effort. 1047 01:32:30,960 --> 01:32:34,040 We appreciate it and I understand it more than others. 1048 01:32:36,950 --> 01:32:42,930 Madam Chair, fellow Planning Commission members, my name is Ben Kuhn at 1223 Pierce Street, 1049 01:32:43,010 --> 01:32:43,530 Raleigh. 1050 01:32:43,530 --> 01:32:45,830 I've practiced, I'm a land use lawyer. 1051 01:32:46,270 --> 01:32:50,850 I work with developers and land use issues, variances and so forth. 1052 01:32:50,890 --> 01:32:52,490 I've been before this body several times before. 1053 01:32:52,970 --> 01:32:57,230 I was before you when this came before you in committee and also last time when they 1054 01:32:57,230 --> 01:32:59,990 sought to have it rezoned, that rezoning was ultimately denied. 1055 01:33:00,670 --> 01:33:02,190 This needs to go back to committee. 1056 01:33:02,330 --> 01:33:06,670 There's been policy changes since this last came before you in the adoption of 1057 01:33:06,670 --> 01:33:12,030 the transition zone which does have significant impact in the policy framework that this 1058 01:33:12,030 --> 01:33:17,230 has and it's not, hadn't been mentioned once. But that was adopted by city council last 1059 01:33:17,230 --> 01:33:22,490 time and it is a policy issue and layer that you need to consider. You also have to understand 1060 01:33:22,490 --> 01:33:29,010 it's, to me, as a land use lawyer, it's not about the use or the location. It's 1061 01:33:29,010 --> 01:33:34,310 about the height of it, which is completely out of odds with the context of the area. 1062 01:33:35,490 --> 01:33:41,550 It's not in a transit station area. The West Street and Johnson Street station area 1063 01:33:41,550 --> 01:33:45,990 It is off the books in terms of communication I had with Hett Patel two years ago, which 1064 01:33:45,990 --> 01:33:51,290 I presented to the City Planning Commission, I believe, at that time. 1065 01:33:52,090 --> 01:33:53,130 We have that documentation. 1066 01:33:53,570 --> 01:34:00,850 It's supposed to be at Capital Boulevard right where it verges off right behind the Long 1067 01:34:00,850 --> 01:34:01,410 Leaf Hotel. 1068 01:34:01,970 --> 01:34:10,110 If you string a line from that point to this site, it's .26 of a mile, more than 1069 01:34:10,110 --> 01:34:14,650 a quarter mile. Even if you argue that it's within the transit station area for that location, 1070 01:34:14,950 --> 01:34:20,570 it's at the very edge of the transit station area. And what I would point you to is the 1071 01:34:20,570 --> 01:34:26,110 Equitable Transit Oriented Development Guidebook, the policy that guides development within 1072 01:34:26,110 --> 01:34:32,490 transit areas. And it suggests to you that in a transit area at the transit station, 1073 01:34:32,710 --> 01:34:37,410 that's where the most heightened density would be. And guess what? As you venture 1074 01:34:37,410 --> 01:34:44,190 further and farther outside from the transit station area. The document says specifically 1075 01:34:44,190 --> 01:34:49,350 the policy guidance is that the height and the density would taper and transition down 1076 01:34:49,960 --> 01:34:56,010 towards any nearby neighborhoods that are residential density. So for that reason, more 1077 01:34:56,010 --> 01:35:03,130 policy guidance is needed and needs to be put in committee and we appreciate that consideration. 1078 01:35:03,630 --> 01:35:03,930 Thank you. 1079 01:35:03,930 --> 01:35:10,930 Thank you. Thank you all for your comments. Okay, we will bring it back to the table. 1080 01:35:11,910 --> 01:35:12,510 Commissioner Neptune. 1081 01:35:13,250 --> 01:35:19,750 Thank you, Madam Chair. Just briefly, I'd like to acknowledge and express my thanks 1082 01:35:19,750 --> 01:35:25,190 and gratitude to all of the residents for being here this morning on your time. 1083 01:35:25,930 --> 01:35:34,770 Just deeply appreciate you taking time out of your day to be with us to share your concerns. 1084 01:35:36,130 --> 01:35:40,690 And I guess there's a quick follow on that just to make sure I'm hearing it clearly. 1085 01:35:41,890 --> 01:35:46,430 It feels as if there are sort of two buckets of concern. 1086 01:35:46,550 --> 01:35:53,030 There's like the height and our homes, you know, like the height of the potential buildings and our homes. 1087 01:35:53,630 --> 01:36:01,090 and then separate but of course related is transit and traffic and if we just kind 1088 01:36:01,090 --> 01:36:04,710 of I just want to ask a follow-up question to make sure I'm clear and I 1089 01:36:04,710 --> 01:36:07,730 think it's a question for we'll start with transit and traffic maybe start 1090 01:36:07,730 --> 01:36:13,430 with transportation staff you know I'm under the impression and just you know 1091 01:36:13,430 --> 01:36:21,310 based on the review of the materials also based on prior service with the 1092 01:36:21,310 --> 01:36:28,190 2019 and being familiar with this corridor, my impression and understanding is that since 1093 01:36:28,190 --> 01:36:34,990 at least 2016, at minimum, when we adopted this Wake County Transit Plan, there have 1094 01:36:34,990 --> 01:36:43,550 effectively been plans and studies and designs for a future transit sort of corridor. 1095 01:36:44,090 --> 01:36:48,290 So I know we're working on this like bus rapid transit corridor on the one side. 1096 01:36:48,290 --> 01:36:53,330 And then if transportation staff could speak to this, I think there's like an S-line high-speed rail connection. 1097 01:36:53,570 --> 01:36:57,210 We're also working on, I think we've got federal funding to support this. 1098 01:36:57,370 --> 01:37:00,070 I mean, all these systems are kind of moving forward. 1099 01:37:00,530 --> 01:37:07,770 But again, I would welcome transportation staff if you could maybe speak to that briefly as far as the transit-related operations. 1100 01:37:08,050 --> 01:37:13,790 That, again, just from my understanding of the review of the materials and just from prior commission service, 1101 01:37:14,930 --> 01:37:20,850 If you could speak to the transit-related operations that are in development for the corridor. 1102 01:37:21,050 --> 01:37:30,730 I think that it would be helpful to hear in relation to the concerns around traffic and gridlock congestion that we're hearing from the residents. 1103 01:37:32,250 --> 01:37:42,610 If I could just add to that, there seems to be some concern about the location of the proposed transit station. 1104 01:37:42,610 --> 01:37:51,330 So, if you could just speak to the decision-making around where the transit station is proposed 1105 01:37:51,330 --> 01:37:55,350 to be, that might clear up some of this confusion as well. 1106 01:37:55,970 --> 01:37:56,370 Yeah. 1107 01:37:56,450 --> 01:37:58,010 Thank you, Commissioner Neptune and Chair Bennett. 1108 01:37:58,150 --> 01:38:02,950 We have Carter Robertson with the Transportation Department, who can speak to the trip generation 1109 01:38:03,470 --> 01:38:09,750 traffic analysis and existing conditions for car flow, and we also have Gabriel Wilkins 1110 01:38:09,750 --> 01:38:16,310 from transit planning to enter questions related to BRT and other transit services. 1111 01:38:16,650 --> 01:38:16,990 Thank you. 1112 01:38:17,770 --> 01:38:22,390 And maybe just I would note to staff as you approach, if you could just share briefly, very briefly, 1113 01:38:22,990 --> 01:38:28,590 just the background on these transit plans that are in development in progress, 1114 01:38:29,090 --> 01:38:30,990 I think that would be appreciated by the Commission. 1115 01:38:31,890 --> 01:38:34,150 Of course, good morning, Commission. 1116 01:38:34,410 --> 01:38:37,870 Gabriel Wilkins with Transportation and Transit on the BRT team. 1117 01:38:37,870 --> 01:38:39,710 So I'll start with Bus Rapid Transit. 1118 01:38:39,950 --> 01:38:42,330 Carder can handle SLINE and my colleague, Melanie, 1119 01:38:42,670 --> 01:38:44,130 will be able to answer questions about 1120 01:38:44,950 --> 01:38:46,370 ordinary fixed route service here. 1121 01:38:47,030 --> 01:38:51,470 So the Bus Rapid Transit system in Wake County 1122 01:38:52,170 --> 01:38:54,850 was initially planned by a major investment study 1123 01:38:55,590 --> 01:38:57,950 ahead of the 2016 Wake Transit Plan. 1124 01:38:58,430 --> 01:38:59,750 So that included four corridors, 1125 01:39:00,150 --> 01:39:02,890 Newburn Avenue, Southern, Western, and Northern. 1126 01:39:03,470 --> 01:39:06,610 At the time, the Northern BRT corridor in that study, 1127 01:39:06,610 --> 01:39:13,430 2016, only included from the downtown portion out up Capital Boulevard to where it diverges 1128 01:39:13,430 --> 01:39:15,830 off to Wake Forest Road. 1129 01:39:16,870 --> 01:39:21,150 So it was initially just that kind of stub with the idea that it would be revisited later 1130 01:39:21,720 --> 01:39:24,550 after the other corridors advance in their planning. 1131 01:39:26,340 --> 01:39:32,510 The 2019 Raleigh Comprehensive Plan took those major investment studies, the corridors 1132 01:39:32,510 --> 01:39:37,350 for BRT from those studies and that's what kind of fed into the map that the 1133 01:39:37,350 --> 01:39:41,150 applicant showed about the transit station areas downtown. Those are bus rapid 1134 01:39:41,150 --> 01:39:46,190 transit stations. Bus stops kind of a different level of transit we can get 1135 01:39:46,190 --> 01:39:52,090 to later. So currently that northern corridor is being revisited in a new 1136 01:39:52,090 --> 01:39:57,650 major investment study to consider the downtown to its actual endpoints. That 1137 01:39:57,650 --> 01:40:03,630 is slated to wrap up the end of this year, which will kind of come out with two identified 1138 01:40:04,160 --> 01:40:11,050 kind of preferred corridors for that route. Now, those studies are taking as a starting 1139 01:40:11,050 --> 01:40:16,730 point the existing 2016 study. So from that Wake Forest, a capital, and going one route 1140 01:40:16,730 --> 01:40:24,270 up to Midtown and one route towards the Triangle Town Center area. The zoning case 1141 01:40:24,270 --> 01:40:29,870 This here is located within that kind of stubbed portion that was already within kind 1142 01:40:29,870 --> 01:40:30,510 of planning. 1143 01:40:31,490 --> 01:40:36,910 There were two kind of different routes for how it might move around. 1144 01:40:37,410 --> 01:40:39,210 West Street was included at the time. 1145 01:40:40,230 --> 01:40:45,030 In going through planning, Capital Boulevard is currently the preferred location. 1146 01:40:46,550 --> 01:40:52,790 Specific stations will not be identified until preliminary design is entered. 1147 01:40:52,790 --> 01:40:55,750 And that follows the kind of conclusion of a major investment study. 1148 01:40:56,270 --> 01:41:01,090 The Newburn, Southern, and Western BRTs are all currently, well, Newburn's getting ready 1149 01:41:01,090 --> 01:41:06,590 to be built, Southern and Western have completed that preliminary design into final design. 1150 01:41:06,730 --> 01:41:09,050 That's where those specific station locations get nailed down. 1151 01:41:09,730 --> 01:41:13,970 Part of the major investment study looks at identifying key intersections at which 1152 01:41:13,970 --> 01:41:19,210 a station, near which a station would be located so that we can model ridership potential, 1153 01:41:19,210 --> 01:41:24,790 see what the kind of development may look like around the stations and how 1154 01:41:24,790 --> 01:41:29,070 connections to other fixed route, other active transportation, bicycle and 1155 01:41:29,070 --> 01:41:34,270 pedestrian, and kind of other amenities such as parks might happen. The 1156 01:41:34,270 --> 01:41:38,430 intersection around peace street and capital boulevard has been identified 1157 01:41:38,430 --> 01:41:44,230 since that 2016 plan through to today as an area of interest to locate a bus 1158 01:41:44,230 --> 01:41:47,690 rapid transit station and that remains true. Where it will actually be 1159 01:41:47,690 --> 01:41:55,210 located depends a lot on engineering concerns given the kind of lots of topography and grade 1160 01:41:55,210 --> 01:42:01,890 separated areas there. But that area is kind of of key interest from 2016 to now for a 1161 01:42:01,890 --> 01:42:02,830 bus rapid transit station. 1162 01:42:03,750 --> 01:42:04,250 Thank you. 1163 01:42:04,670 --> 01:42:10,810 Thank you. A quick follow-up. So just briefly, the actual locations have not been identified. 1164 01:42:11,050 --> 01:42:16,430 That won't happen until we get farther into engineering, planning, et cetera. Just 1165 01:42:16,430 --> 01:42:17,590 Just make sure I'm clear on that. 1166 01:42:17,730 --> 01:42:17,930 Correct. 1167 01:42:18,130 --> 01:42:23,850 And that is why that quarter to a half mile buffer, quarter mile buffer is where this kind 1168 01:42:23,850 --> 01:42:24,370 of … 1169 01:42:24,370 --> 01:42:27,530 And then it's a quick follow-up for the applicant or the developer on the project. 1170 01:42:29,130 --> 01:42:34,670 Have they been involved at all or have they expressed interest in working with the city 1171 01:42:34,670 --> 01:42:39,110 in this, I guess, potential connectivity to the transit station? 1172 01:42:39,330 --> 01:42:43,450 I mean, perhaps you could speak to it, perhaps the, I guess, the attorney here on behalf 1173 01:42:43,450 --> 01:42:50,250 of the applicants could speak to that the interest of the developer in coordinating the development 1174 01:42:50,250 --> 01:42:54,070 with the transition. I mean, it seems like, I feel like that was included in the presentation, 1175 01:42:54,230 --> 01:42:57,710 but maybe you could speak to that in more detail on behalf of the applicant. 1176 01:42:57,810 --> 01:43:01,430 Sure. Commissioner Naptan, we absolutely have been following it. Chris Carter and 1177 01:43:01,430 --> 01:43:04,770 Raleigh Development Company have been following the discussions associated with BRT recognizing 1178 01:43:05,370 --> 01:43:09,030 that as this site develops, as well as the sites that are in proximity to the site, 1179 01:43:09,310 --> 01:43:13,150 having access to transit is of critical import. So absolutely interested in continuing 1180 01:43:13,150 --> 01:43:15,910 in that work with the city and certainly we'll be following it as we go. 1181 01:43:16,450 --> 01:43:17,070 Thank you. 1182 01:43:17,350 --> 01:43:18,110 Thank you all. 1183 01:43:18,350 --> 01:43:21,910 Now, if we could hear about the S line and I guess any work on that? 1184 01:43:23,190 --> 01:43:25,110 I just want to keep us on track. 1185 01:43:26,290 --> 01:43:31,670 This is a frequent transit designation because of the R line, correct? 1186 01:43:32,630 --> 01:43:37,070 So that's not even, I don't want to say it's not relevant, but it's really not relevant 1187 01:43:37,070 --> 01:43:40,930 to the frequent transit designation of this area. 1188 01:43:40,930 --> 01:43:50,590 So I just want to make sure we're able to talk about the TIA and the height and all of our other questions that we might have. 1189 01:43:51,590 --> 01:43:52,570 Is that okay? 1190 01:43:53,050 --> 01:44:00,870 I suppose it seemed relevant in that it's also within the context of the neighborhood. 1191 01:44:01,470 --> 01:44:08,890 And right now, if I'm hearing it correctly, we have residents who are concerned about the proximity of the development. 1192 01:44:08,890 --> 01:44:15,530 and just I guess I'm trying to seek clarity on the neighborhood, their 1193 01:44:15,530 --> 01:44:20,590 backyards, the rail line which is being upgraded to this high-speed rail line 1194 01:44:20,590 --> 01:44:25,850 and then we have this currently zoned industrial I guess mix use okay and then 1195 01:44:25,850 --> 01:44:28,450 we have a street and then we have this development that's what I'm trying to 1196 01:44:28,450 --> 01:44:33,350 get clarity on. So very briefly could you just tell us about the S line and 1197 01:44:33,350 --> 01:44:40,070 it's proximity to. I can yes and also Commissioner Maynard you raise the valid 1198 01:44:40,070 --> 01:44:47,510 point for consideration is regardless of the BRT transit location the site is 1199 01:44:47,510 --> 01:44:55,210 qualified as core transit on Table LU2 by its service of existing transit today 1200 01:44:55,210 --> 01:44:56,150 the R line. 1201 01:45:00,000 --> 01:45:05,980 And its location within a mixed use center of 30 acres or greater, qualify it. 1202 01:45:07,060 --> 01:45:11,820 One or the other qualifies. This qualifies both. So the language in the comprehensive plan says 1203 01:45:11,820 --> 01:45:18,480 core transit can be qualified with either planned frequent transit. It has frequent transit 1204 01:45:18,480 --> 01:45:24,140 today. So that qualifies. The other is its location within the bus rapid transit area 1205 01:45:24,140 --> 01:45:29,580 downtown and the other mixed use centers on that map. Thank you. Yeah. 1206 01:45:33,850 --> 01:45:34,390 Good morning 1207 01:45:34,390 --> 01:45:38,410 everyone. Carter Robertson with transportation. I'm going to find a 1208 01:45:38,410 --> 01:45:44,310 picture here so I could orient us towards the site and the S line and how 1209 01:45:44,310 --> 01:45:45,870 those two will interact. 1210 01:45:48,360 --> 01:45:52,900 A little more zoomed in. Here we go. So brief 1211 01:45:52,900 --> 01:45:59,460 overview of what the S line project is. It's a partnership between NCDOT 1212 01:45:59,460 --> 01:46:04,640 and the Virginia passenger rail authority to connect Richmond to Raleigh with 1213 01:46:04,640 --> 01:46:12,080 high-speed rail. And so a federal grant was granted for construction from Raleigh 1214 01:46:12,080 --> 01:46:15,060 to Wake Forest in 2022, I believe. 1215 01:46:17,720 --> 01:46:20,560 Specific to the site where it will run 1216 01:46:20,560 --> 01:46:28,160 is just on the other side of West Street here. We have the existing railroad 1217 01:46:28,160 --> 01:46:34,900 road track, the SLINE will align a little bit to the east of it there, overlapping a 1218 01:46:34,900 --> 01:46:41,180 bit with those buildings. So, some right-of-way and property acquisition is going to be required. 1219 01:46:41,340 --> 01:46:47,920 That was included as part of the grant design, right-of-way acquisition, and construction. 1220 01:46:48,900 --> 01:46:56,380 Currently, U.S. DOT is working through a backlog of grants that haven't been designated 1221 01:46:56,380 --> 01:47:03,420 yet, and S-Line is one of those that they are working on, and so once that gets encumbered 1222 01:47:03,420 --> 01:47:10,880 to this project, we'll have the green light for construction. That's a big overlap of 1223 01:47:10,880 --> 01:47:17,940 S-Line. They would be separating this development from the neighborhood to the west, approximately 1224 01:47:17,940 --> 01:47:19,600 as you see that line that I drew. 1225 01:47:21,100 --> 01:47:24,360 Thank you, and thank you, Madam Chair, for bearing with live. 1226 01:47:24,360 --> 01:47:25,620 Of course. No problem. 1227 01:47:26,440 --> 01:47:32,500 Danielle, we were going to talk about, I believe you wanted to hear about the traffic and what the traffic study showed. 1228 01:47:33,020 --> 01:47:33,180 Right. 1229 01:47:34,400 --> 01:47:37,880 So a traffic study was not required for this site. 1230 01:47:38,620 --> 01:47:41,220 Matthew did a good job of explaining earlier. 1231 01:47:42,240 --> 01:47:49,560 At rezoning what we're looking at is the difference between trips generated under the current zoning and the proposed zoning. 1232 01:47:49,560 --> 01:47:54,360 And in this case, the office entitlement was reduced significantly. 1233 01:47:55,080 --> 01:47:58,260 Industrial entitlement was cut out entirely. 1234 01:47:58,760 --> 01:48:03,460 And so those two land uses typically are high driver of trips in our model. 1235 01:48:03,900 --> 01:48:09,440 And so while there is an increase in density for residential, the overall trip impact 1236 01:48:09,440 --> 01:48:15,140 is less than what is currently, what the site is currently zoned for. 1237 01:48:15,300 --> 01:48:18,560 So that's why a traffic study was not required at rezoning. 1238 01:48:18,560 --> 01:48:24,260 one may be required at site plan if it meets the triggers that we look at at 1239 01:48:24,260 --> 01:48:32,520 that stage. I hear the residents concern about P Street. We do realize that that 1240 01:48:32,520 --> 01:48:39,000 is an issue of east-west vehicle connectivity for downtown. Right now the 1241 01:48:39,000 --> 01:48:44,360 volumes that we're seeing on P Street is around 17,000 vehicles per day. 1242 01:48:44,360 --> 01:48:51,780 that's in line with our projections for a four-lane divided avenue. Another thing 1243 01:48:51,780 --> 01:48:56,180 I wanted to highlight, we've talked a lot about walkability in the site and 1244 01:48:56,180 --> 01:49:01,440 current and future transit. This intersection of peace in West Street is 1245 01:49:01,440 --> 01:49:07,700 also going to be very valuable as a part of our future bike network. As I've 1246 01:49:07,700 --> 01:49:11,520 mentioned before, at Planning Commission, we're working on our active 1247 01:49:11,520 --> 01:49:17,400 Mobility Plan, and right now our draft is designating both Peace Street and West and 1248 01:49:17,400 --> 01:49:23,580 Harrington as priority bike corridors, Peace Street. We would like to see upgraded to a 1249 01:49:23,580 --> 01:49:28,560 separated facility to provide that east-west connection for the city in terms of cycling. 1250 01:49:29,240 --> 01:49:32,880 Just briefly, I think the two former chairs of the Bicycle Pedestrian Advisory Commission 1251 01:49:32,880 --> 01:49:37,700 deeply appreciate hearing about this future connectivity for our cyclists in the community. 1252 01:49:37,700 --> 01:49:40,780 so thank you and the walkers too and the walkers too. 1253 01:49:43,060 --> 01:49:44,080 Does that answer your 1254 01:49:44,080 --> 01:49:50,340 question? It absolutely does thank you. Thank you. Commissioner Miller. May I have a 1255 01:49:50,340 --> 01:49:54,840 quick follow-up for traffic? Could you also just address the projections about 1256 01:49:54,840 --> 01:50:00,500 P Street and the forthcoming development and any plans that may be in the 1257 01:50:00,500 --> 01:50:09,160 area to address traffic concerns? Not directly related to road capacity I 1258 01:50:09,160 --> 01:50:12,200 I mean, the overall vision for downtown 1259 01:50:12,200 --> 01:50:16,260 and adding these different forms of travel 1260 01:50:16,260 --> 01:50:20,360 is to increase the mode share between vehicles, 1261 01:50:20,560 --> 01:50:22,360 pedestrian, cyclists, and transit. 1262 01:50:23,080 --> 01:50:26,640 So that's our overall approach for this area right now. 1263 01:50:26,720 --> 01:50:28,800 We don't have any specific projects 1264 01:50:29,300 --> 01:50:32,260 that would address specifically vehicle capacity. 1265 01:50:33,040 --> 01:50:34,960 It's gonna say, is that part of the city's policy 1266 01:50:34,960 --> 01:50:40,900 see where we sometimes put stress on an area on traffic while increasing, on car traffic 1267 01:50:40,900 --> 01:50:46,120 while increasing alternative options in order to try to pursue those alternative policies 1268 01:50:46,120 --> 01:50:46,600 in the area? 1269 01:50:49,510 --> 01:50:53,030 I would have to review our policy a bit on that. 1270 01:50:53,350 --> 01:50:53,550 Okay. 1271 01:50:58,130 --> 01:50:58,790 Commissioner Outville. 1272 01:51:00,410 --> 01:51:01,210 Thank you, Chairman. 1273 01:51:02,830 --> 01:51:07,790 When this property was up for rezoning the first time around a couple years ago, 1274 01:51:07,790 --> 01:51:14,090 I voted in favor of the rezoning. When the text change came before us to add the 1275 01:51:14,090 --> 01:51:19,530 area to a downtown transition zone I voted against it and but nevertheless 1276 01:51:19,530 --> 01:51:24,710 it's now part of the city policy. Coming into this meeting I thought that I 1277 01:51:24,710 --> 01:51:31,110 would be voting against this proposal due to that condition until I got into 1278 01:51:31,110 --> 01:51:35,910 my studies and read the actual definitions and the text is very 1279 01:51:35,910 --> 01:51:45,450 clear that, let me see, it's DT 1.14, I believe, which states that these transition areas should 1280 01:51:45,450 --> 01:51:54,330 be used for lower height developments, but if there is existing overlay zoning in the 1281 01:51:54,330 --> 01:51:58,650 area, that should take precedence unless there is a small area plan that's implemented. 1282 01:51:58,650 --> 01:52:07,090 I think this area is very clearly defined as a core transit area by the definition that 1283 01:52:07,090 --> 01:52:14,690 goes along with Table LU2 and the comprehensive plan, and as such, like regardless of where 1284 01:52:14,690 --> 01:52:18,870 the BRT gets placed, it's served by frequent transit at this time. 1285 01:52:19,430 --> 01:52:25,170 And I think it is defined as such, it's very clearly part of the core downtown area 1286 01:52:25,170 --> 01:52:26,690 and the future land use map. 1287 01:52:27,510 --> 01:52:30,270 And if you reference table LU2, which 1288 01:52:30,270 --> 01:52:33,870 is supposed to be our primary reference for determining 1289 01:52:35,010 --> 01:52:38,610 building heights and rezoning, this clearly 1290 01:52:38,610 --> 01:52:42,150 qualifies for the kind of height that is being requested. 1291 01:52:43,170 --> 01:52:46,550 I believe our job is to give our interpretation 1292 01:52:46,550 --> 01:52:48,370 of the planning documents and give 1293 01:52:48,370 --> 01:52:50,010 an assessment of whether we think 1294 01:52:50,010 --> 01:52:52,650 it's in line with the policies and documents as they exist. 1295 01:52:53,610 --> 01:52:57,930 It's not our opinion on whether we think that this is a good or bad development. 1296 01:52:58,550 --> 01:53:02,270 I wish this had a shot front urban form designation. 1297 01:53:02,570 --> 01:53:03,270 I think that would be better. 1298 01:53:03,710 --> 01:53:05,430 I am concerned about traffic. 1299 01:53:06,230 --> 01:53:09,970 I wish that the project contains stronger conditions about supporting the park. 1300 01:53:10,710 --> 01:53:16,730 But these are not part of our decision on whether the zoning meets the planning 1301 01:53:16,730 --> 01:53:17,550 documents or not. 1302 01:53:17,550 --> 01:53:23,850 That table LU2 is very definitive in this projection. 1303 01:53:24,410 --> 01:53:29,510 And to address the concern that this sets a precedent across the city, these conditions 1304 01:53:29,510 --> 01:53:30,790 don't exist across the city. 1305 01:53:31,250 --> 01:53:43,190 That you have a 30-acre mixed use area, the front on frequent transit zones, and that 1306 01:53:44,470 --> 01:53:49,990 cross-reference on table LU2, see if I can get there. Sorry for my scrolling 1307 01:53:49,990 --> 01:53:50,330 around. 1308 01:53:58,710 --> 01:54:02,810 These kind of heights are only recommended at the 1309 01:54:02,810 --> 01:54:08,150 intersection of a core transit area and a central business district or downtown 1310 01:54:08,710 --> 01:54:12,970 core zone and this does not exist across the city and I don't think that 1311 01:54:12,970 --> 01:54:18,670 this puts neighborhoods across the city at risk or sets a precedent. I'm going 1312 01:54:18,670 --> 01:54:21,110 to be voting to support this proposal when the time comes. 1313 01:54:21,310 --> 01:54:22,550 Thank you, Commissioner. 1314 01:54:23,030 --> 01:54:27,350 I will appreciate you going through Table LU2 and the policy. 1315 01:54:29,310 --> 01:54:33,790 Could I ask staff, maybe Mr. Clem or Bynam, 1316 01:54:34,570 --> 01:54:39,870 we heard a few times about the staff report not being 1317 01:54:39,870 --> 01:54:41,870 available at the neighborhood meetings. 1318 01:54:43,230 --> 01:54:45,530 Are they typically available at neighborhood meetings? 1319 01:54:45,690 --> 01:54:47,190 Could you talk about the timing of when 1320 01:54:47,190 --> 01:54:51,130 the staff report comes out versus when the applicant neighborhood meetings are held? 1321 01:54:52,130 --> 01:54:57,290 So like this case and others, when there is a second neighborhood meeting required by 1322 01:54:57,290 --> 01:55:03,490 the code, the case will not move forward to planning commission review until the second 1323 01:55:03,490 --> 01:55:10,490 neighborhood meeting is conducted. So the staff report won't be published until your 1324 01:55:10,490 --> 01:55:17,730 first review of the case, which is today. So it is not typical that the full staff report 1325 01:55:17,730 --> 01:55:23,110 is done by the time of the second neighborhood meeting because the case is not complete and 1326 01:55:23,110 --> 01:55:29,950 ready for review until that is done. So in the rezoning process laid out in the Unified 1327 01:55:29,950 --> 01:55:30,850 Development Ordinance, 1328 01:55:33,560 --> 01:55:37,940 the second neighborhood meeting has to occur before you have your 1329 01:55:37,940 --> 01:55:44,880 deliberations, and the staff report is not published until your first deliberations. 1330 01:55:45,160 --> 01:55:48,640 So that is a condition that is perennial to the process. 1331 01:55:49,800 --> 01:55:50,640 Thank you. 1332 01:55:56,670 --> 01:56:01,190 Has there been any studies on the environmental impact of the neighborhoods around the project? 1333 01:56:01,370 --> 01:56:03,890 And anybody, these are questions that anybody can answer. 1334 01:56:05,750 --> 01:56:11,410 So we have stormwater staff that can speak to the stormwater runoff and what the 1335 01:56:11,410 --> 01:56:14,130 code requires in terms of addressing those conditions. 1336 01:56:15,770 --> 01:56:20,870 We have some analysis in the comprehensive plan, recommends encouraging walkability, 1337 01:56:21,470 --> 01:56:29,550 encouraging transit use, and active mobility as an encouragement to burn less fossil fuels. 1338 01:56:30,550 --> 01:56:39,770 The staff report also contains metrics comparing detached houses to apartments and townhouses 1339 01:56:39,770 --> 01:56:42,070 and other building types that have shared walls. 1340 01:56:42,710 --> 01:56:47,210 We know that when folks live in a building type 1341 01:56:47,210 --> 01:56:48,870 that shares wall with a neighbor, 1342 01:56:49,330 --> 01:56:53,450 that both of them use less natural resources 1343 01:56:53,450 --> 01:56:55,450 for heating and cooling because they insulate each other. 1344 01:56:56,050 --> 01:56:59,470 So within the staff report and within the comprehensive plan 1345 01:56:59,470 --> 01:57:02,750 there is guidance that encourages dense walkable, 1346 01:57:03,210 --> 01:57:06,710 mixed use, apartment use and townhouse development 1347 01:57:06,710 --> 01:57:12,570 and an effort to reduce the per capita carbon emissions from folks living in the city. 1348 01:57:13,050 --> 01:57:18,790 What's been the consistent or the average feedback from community engagement about the project? 1349 01:57:19,710 --> 01:57:26,670 So there is a engagement portal that we put up for every rezoning case. 1350 01:57:27,390 --> 01:57:33,030 The particular responses from the engagement portal for this case, 1351 01:57:33,030 --> 01:57:39,390 I believe had four comments in support and four comments in opposition. 1352 01:57:39,810 --> 01:57:48,290 So that's the city's official engagement opportunity for every case. 1353 01:57:48,590 --> 01:57:54,350 We have received a number of emails though over the last several weeks. 1354 01:57:54,710 --> 01:57:59,710 Even though the engagement portal wasn't really used, we've received a number of emails. 1355 01:57:59,710 --> 01:58:05,870 That's why I'm trying to figure out what the average response to this project has been 1356 01:58:05,870 --> 01:58:07,570 from your community engagement. 1357 01:58:07,790 --> 01:58:13,290 Has the overarching response been in opposition or has it been in support? 1358 01:58:14,390 --> 01:58:20,030 Yeah, I would say based on the engagement portal and then also outlined in the report 1359 01:58:20,030 --> 01:58:26,830 is some summation of the neighborhood group who came to speak today and their online 1360 01:58:26,830 --> 01:58:29,750 online postings and social media has been an opposition to the case. 1361 01:58:32,450 --> 01:58:38,410 I also see that where did the $1.2 million number come from for affordable housing? 1362 01:58:38,790 --> 01:58:40,930 That was provided by the applicants. 1363 01:58:41,450 --> 01:58:45,150 We can ask them up to speak to how they came to that number if you'd like. 1364 01:58:46,330 --> 01:58:47,170 Yes, please. 1365 01:58:50,950 --> 01:58:57,890 Could the applicant address the question of where the $1.2 million figure came from? 1366 01:58:57,890 --> 01:58:58,830 The 1367 01:59:09,010 --> 01:59:16,350 affordable housing, the number it specifically came to be as a result of 30 units at $40,000 1368 01:59:16,900 --> 01:59:17,470 per unit. 1369 01:59:17,910 --> 01:59:18,310 Okay. 1370 01:59:18,990 --> 01:59:25,610 And I know that they said that there were conditions on the affordable housing contribution. 1371 01:59:25,950 --> 01:59:26,110 Why? 1372 01:59:27,230 --> 01:59:28,430 Are there conditions? 1373 01:59:28,930 --> 01:59:33,510 Like whether or not you get so many stories determines whether or not the contribution 1374 01:59:33,510 --> 01:59:33,970 is made. 1375 01:59:34,190 --> 01:59:34,510 Excuse me. 1376 01:59:35,010 --> 01:59:35,230 Yeah. 1377 01:59:35,230 --> 01:59:42,110 So, from a timing standpoint, and I think what you're getting at is we're not making 1378 01:59:42,110 --> 01:59:42,430 the payment. 1379 01:59:42,530 --> 01:59:45,930 The developer is not making the payment until the 500 unit. 1380 01:59:46,470 --> 01:59:51,850 And primarily, that's related to being able to finance the deal, because so you can start 1381 01:59:51,850 --> 01:59:56,690 the building and then you can make a contribution as you're being able to occupy units 1382 01:59:56,690 --> 01:59:56,970 It's either. 1383 02:00:01,600 --> 02:00:06,280 I would tell you that their intention, the developer's intention, is absolutely to make 1384 02:00:06,280 --> 02:00:11,440 that contribution. We could do, they could do 500 units as of today. They could do 499 units 1385 02:00:11,440 --> 02:00:16,260 as of today, but they wouldn't be going through this process if their intent wasn't to significantly 1386 02:00:16,260 --> 02:00:19,800 exceed that 499 unit count and make that contribution. 1387 02:00:20,180 --> 02:00:20,440 I 1388 02:00:23,540 --> 02:00:27,760 had another one, but I'm still looking if anybody else has other questions or comments 1389 02:00:27,760 --> 02:00:28,680 from commissioners. 1390 02:00:31,080 --> 02:00:33,600 One more question. Is there any economic 1391 02:00:33,600 --> 02:00:38,100 benefit to the community benefit to this project like economic development. I know 1392 02:00:38,100 --> 02:00:45,600 there'll be shops open, minority participation on the project or I mean 1393 02:00:45,600 --> 02:00:50,890 minority participation goals on the project things like that. So there are 1394 02:00:50,890 --> 02:00:55,890 no conditions that speak to minority participation in 1395 02:00:55,890 --> 02:00:59,730 future businesses that may occupy the site. In terms of economic benefit 1396 02:00:59,730 --> 02:01:06,530 there are two factors that we look at with every case. One is the 1397 02:01:06,530 --> 02:01:14,750 is the jobs proximity index. So in terms of the residents of a new structure here would see some 1398 02:01:14,750 --> 02:01:21,950 economic benefit of having reduced costs for their transportation because of all the other options 1399 02:01:22,550 --> 02:01:26,210 that are available to them walking, biking, taking a scooter, taking the bus. 1400 02:01:27,030 --> 02:01:34,430 That's one. The other economic benefit is the very high job proximity index. Folks who live 1401 02:01:34,430 --> 02:01:42,450 in this site we'll be able to walk, bike, or take a bus to a job in downtown 1402 02:01:42,450 --> 02:01:48,910 whether that's a job in an office or a job in a restaurant. Any job downtown is 1403 02:01:48,910 --> 02:01:56,010 a very large job center for the city. It is the city's central business 1404 02:01:56,010 --> 02:02:01,290 district. So if you live in this location then you will have economic 1405 02:02:01,290 --> 02:02:06,810 benefit of proximity with the owner of the project be willing to put minority 1406 02:02:06,810 --> 02:02:12,230 participation goals on this project as a condition. 1407 02:02:16,700 --> 02:02:17,840 Commissioner I think that's 1408 02:02:17,840 --> 02:02:21,720 something that my client is definitely interested in exploring at the time of 1409 02:02:21,720 --> 02:02:26,800 permit approval. We talked about this specifically and the possibility of how 1410 02:02:26,800 --> 02:02:31,560 could you craft an enforceable condition relative to minority business 1411 02:02:31,560 --> 02:02:35,600 participation at part of the zoning stage and it's really tough to do I 1412 02:02:35,600 --> 02:02:36,940 I think from an enforceability standpoint, 1413 02:02:37,120 --> 02:02:39,000 I'll lean on the staff to answer that question. 1414 02:02:39,520 --> 02:02:41,420 But Raleigh Development Company is just that. 1415 02:02:41,540 --> 02:02:42,680 They're Raleigh Development Company. 1416 02:02:42,820 --> 02:02:44,660 They've been in this area for a long time. 1417 02:02:44,740 --> 02:02:47,140 They care deeply about the area that they're invested in 1418 02:02:47,140 --> 02:02:49,280 and they're absolutely gonna be looking for opportunities 1419 02:02:49,280 --> 02:02:51,800 to engage minority contractors in the process. 1420 02:02:52,620 --> 02:02:56,300 I don't think that would be a zoning condition 1421 02:02:56,300 --> 02:02:59,040 could staff or the attorney comment 1422 02:02:59,040 --> 02:03:00,980 on whether that would even be 1423 02:03:00,980 --> 02:03:02,580 an appropriate zoning condition. 1424 02:03:06,650 --> 02:03:10,910 This is the first time I've heard about that condition. I'd probably have to look 1425 02:03:10,910 --> 02:03:12,710 into it and get back to you. I 1426 02:03:15,370 --> 02:03:17,810 have a question for the community. I want to ask 1427 02:03:17,810 --> 02:03:22,290 one more question. We don't typically question the public, but you can go ahead 1428 02:03:22,290 --> 02:03:25,190 and ask a question and if staff or the applicant can answer it. 1429 02:03:28,070 --> 02:03:30,050 Typically that's Commissioner 1430 02:03:33,730 --> 02:03:36,630 Fox. Commissioner Fox, Commissioner Burnett, I'm sorry. 1431 02:03:36,630 --> 02:03:43,470 Yeah, I just wanted to know, although there are always ways to make a project better, I'm 1432 02:03:43,470 --> 02:03:48,090 not finding any inconsistencies with adopted plans and policies. 1433 02:03:48,930 --> 02:03:52,810 So for that reason, I'm ready to support this at the appropriate time. 1434 02:03:53,170 --> 02:03:54,350 Thank you, Commissioner Flux. 1435 02:03:54,750 --> 02:03:55,330 Commissioner Burnett. 1436 02:03:55,790 --> 02:03:57,490 This is a question for the applicant. 1437 02:03:58,250 --> 02:04:01,990 Just regarding what would you say to the neighboring, I guess, you know, residents, 1438 02:04:01,990 --> 02:04:06,870 business owners, restaurant owners, and so on and so forth, how this would be a benefit 1439 02:04:06,870 --> 02:04:10,410 to the community, their businesses, and just the community at whole. 1440 02:04:12,680 --> 02:04:16,740 Yeah. Again, as has been touched on a number of times, Commissioner Burnett, locating density 1441 02:04:16,740 --> 02:04:23,580 in an area like this that is planned for increased multimodal access, but certainly 1442 02:04:23,580 --> 02:04:29,460 already what exists today is walkable access to the businesses along Glenwood South. 1443 02:04:29,620 --> 02:04:32,800 There's certainly walkable and bikeable access down to Union Station to get 1444 02:04:32,800 --> 02:04:37,680 people out and around. And so without a doubt having density of this type in this location 1445 02:04:37,680 --> 02:04:42,600 in an area that is already starting to really grow into something unique and interesting, 1446 02:04:42,880 --> 02:04:47,980 I think can only help continue to grow the businesses that you're seeing not only pop 1447 02:04:47,980 --> 02:04:51,940 up that have been at Glenwood South, but also at Smokey Hollow and other places in proximity. 1448 02:04:55,680 --> 02:04:58,820 Any questions or comments? Commissioner O'Haver? 1449 02:05:01,710 --> 02:05:06,730 I'm not sure if this is for the applicant or for staff, but can somebody help me understand 1450 02:05:06,730 --> 02:05:15,550 the intent of adding 20 additional feet to both zones if the primary street is 1451 02:05:15,550 --> 02:05:21,550 P Street versus West Street. I know that's 20 feet. We're talking about 240, 1452 02:05:21,970 --> 02:05:25,950 but I'm just trying to understand what the intent of that is. We're going from 1453 02:05:25,950 --> 02:05:29,510 12 to 25. That's pretty significant. So I'm trying to understand what two 1454 02:05:29,510 --> 02:05:33,550 additional stories if P Street's primary. So I don't know if that came 1455 02:05:33,550 --> 02:05:36,650 from the applicant or staff, but I'm a little confused by that. 1456 02:05:36,910 --> 02:05:37,370 That's fair. 1457 02:05:37,750 --> 02:05:42,470 That absolutely came from us as the applicant team, and it really depends upon, as was discussed 1458 02:05:42,470 --> 02:05:47,210 during the staff's presentation, whether West Street or P Street ends up being the 1459 02:05:47,210 --> 02:05:47,890 primary street. 1460 02:05:48,530 --> 02:05:53,530 Our goal is to make sure that from on the northern portion of the site that 240 feet 1461 02:05:53,530 --> 02:05:56,130 is going to be measured from West Street. 1462 02:05:56,630 --> 02:06:00,910 And so if West Street is designated as the primary street for the development of that 1463 02:06:00,910 --> 02:06:05,290 portion of the development then it will be 240 feet. There's 20 feet of grade 1464 02:06:05,290 --> 02:06:09,970 change roughly from west to east as you make your way left or right. So west to 1465 02:06:09,970 --> 02:06:13,930 east there's 20 feet of grade change as you head down. So that 20 feet is just 1466 02:06:13,930 --> 02:06:18,150 really recognizing the fact that if we end up having P Street designated as 1467 02:06:18,150 --> 02:06:22,290 the primary street, de facto it's going to increase the building height by 20 1468 02:06:22,290 --> 02:06:25,110 feet because it's now being measured from the low point of the site 1469 02:06:25,110 --> 02:06:26,610 rather than the high point of the site. 1470 02:06:31,640 --> 02:06:34,600 That makes sense. Struggling with 1471 02:06:34,600 --> 02:06:39,700 it a little bit, 20 feet, if it's primary amount. I think again, I think you're asking 1472 02:06:39,700 --> 02:06:41,280 for a significant increase here. 1473 02:06:43,540 --> 02:06:46,680 Let me just process that for a minute. I totally understand 1474 02:06:46,680 --> 02:06:51,240 technically what you're talking about, but I'm hung up on that a little bit. 1475 02:06:51,540 --> 02:06:54,860 That's fair. And to further explain it, really the intent behind that was to provide 1476 02:06:55,360 --> 02:06:59,360 predictability associated with building heights. As you're aware, a 30-story building, 1477 02:06:59,940 --> 02:07:04,520 residential, commercial, you know, office can vary wildly. And so one of the things coming 1478 02:07:04,520 --> 02:07:08,040 into this process in order to provide the transitions that we've talked about, one of 1479 02:07:08,040 --> 02:07:11,440 the things that was important for Raleigh Development Company, was providing predictability 1480 02:07:11,440 --> 02:07:15,240 associated with what are those building heights going to be. And so when we started 1481 02:07:15,240 --> 02:07:22,420 the process, we committed to doing 360 feet along kind of the corner, the zone two, 1482 02:07:22,780 --> 02:07:28,360 if you will, and then 240 feet in this location here. As we were working our way 1483 02:07:28,360 --> 02:07:32,120 through the process, we realized that could be measured from two different places, which 1484 02:07:32,120 --> 02:07:37,020 is why we ended up having that 20-foot variation because we wanted it to be clear to everyone 1485 02:07:37,020 --> 02:07:42,680 without any doubt that 240 feet is measured from West Street and that 360 feet is measured 1486 02:07:42,680 --> 02:07:47,220 from the corner of West and Peace. Really, just to provide those transitions to the 1487 02:07:47,220 --> 02:07:49,600 neighbors who have expressed concerns associated with building height. 1488 02:07:51,730 --> 02:07:55,790 So regardless of the primary street, why can't that be a condition that the building 1489 02:07:55,790 --> 02:07:57,350 height is measured from West Street? 1490 02:08:00,890 --> 02:08:03,310 Yeah, so thank you for the question. 1491 02:08:04,630 --> 02:08:11,590 Where building height is measured from is dictated in the unified development ordinance. 1492 02:08:12,030 --> 02:08:17,790 And zoning conditions can't alter how things are measured, basically, is the short answer. 1493 02:08:19,270 --> 02:08:20,810 How or where, for example. 1494 02:08:21,290 --> 02:08:25,490 So they set up some scenario to account for that in the zoning conditions. 1495 02:08:25,490 --> 02:08:26,550 Does 1496 02:08:28,700 --> 02:08:30,960 that address your question? Commissioner Haber? 1497 02:08:31,840 --> 02:08:32,700 Yes, ma'am. Thank you. 1498 02:08:35,410 --> 02:08:38,350 Questions, comments? Other? Commissioner Miller? 1499 02:08:38,670 --> 02:08:41,330 One final comment. Just wanted to, not a question. 1500 02:08:42,030 --> 02:08:47,270 There's been a lot of discussion about the benefit to the businesses and to transit and the walkability. 1501 02:08:47,750 --> 02:08:52,970 I just wanted to also note similarly to when this case came up to us previously, 1502 02:08:53,830 --> 02:08:57,210 the benefit to the park as well, being immediately adjacent. 1503 02:08:57,210 --> 02:09:03,590 we've heard time and again a park is as successful as its edges. I too would have been interested 1504 02:09:03,590 --> 02:09:10,450 in more retail or a shopfront urban form designation, those kind of things along the line. Maybe 1505 02:09:10,450 --> 02:09:14,750 that's something that the applicant can still think about when it terms in terms of putting 1506 02:09:14,750 --> 02:09:20,350 in retail. But I am encouraged and look forward to seeing how this positive impacts the park 1507 02:09:20,350 --> 02:09:20,630 as well. 1508 02:09:24,350 --> 02:09:29,190 Commissioner O'Haver, are you reaching? Sorry, procedural question. Is this the first 1509 02:09:29,190 --> 02:09:33,190 First bite of the cherry or is there an opportunity to change these ordinance? 1510 02:09:33,330 --> 02:09:35,250 I know we've seen this case before, but. 1511 02:09:35,390 --> 02:09:35,970 No, we haven't. 1512 02:09:36,090 --> 02:09:38,710 This is the first time we're seeing this particular. 1513 02:09:39,110 --> 02:09:45,310 So there is an opportunity to request that the applicant reconsider some of the conditions 1514 02:09:45,890 --> 02:09:46,370 procedurally. 1515 02:09:47,070 --> 02:09:47,250 Okay. 1516 02:09:47,390 --> 02:09:47,650 Thank you. 1517 02:09:48,330 --> 02:09:52,210 Are there conditions that you would like them to consider or reconsider? 1518 02:09:53,530 --> 02:09:58,750 Well, I've heard a couple comments from commissioners about shopfront, which I think I agree 1519 02:09:58,750 --> 02:09:59,030 with. 1520 02:10:01,710 --> 02:10:05,430 I can probably be convinced, but I'm still hung up a little bit on 20 feet. I don't 1521 02:10:06,030 --> 02:10:12,010 know where Jason went, but a little bit in the weeds. I agree with Commissioner Miller. 1522 02:10:12,210 --> 02:10:18,290 I appreciate the 15,000 square feet. A lot of times, technically, these projects downtown 1523 02:10:18,290 --> 02:10:24,130 are required to provide open space, but due to the technicality of it, it's really 1524 02:10:24,130 --> 02:10:31,190 not usable. So that commitment to do a 15,000 square foot open space, I appreciate very much 1525 02:10:31,190 --> 02:10:37,230 again addressing the park. But it sounds like there might be a couple of items that could 1526 02:10:37,230 --> 02:10:41,630 be critical to some of the commissioners. I'm not sure what their thoughts are. 1527 02:10:41,830 --> 02:10:45,770 I'm happy to clarify that. I look forward to seeing how this intersects with the park. 1528 02:10:46,130 --> 02:10:51,350 But I believe it was both Commissioner Otwell and Fox that I think to me really stated 1529 02:10:51,350 --> 02:11:06,190 that while there a case can always perhaps be a little better on some of the details the core issues for me with respect to consistency with the comp plan are there and I'm comfortable supporting this project as is. 1530 02:11:07,960 --> 02:11:17,740 Other commissioners are there conditions that you wanted the applicant to consider or reconsider or are you ready to vote? 1531 02:11:21,450 --> 02:11:24,530 I think that this being the first time we're hearing about it it is an 1532 02:11:24,530 --> 02:11:29,790 opportunity for there to be other conditions added to this project just to 1533 02:11:29,790 --> 02:11:33,850 make sure that community and the council I mean the Commission is 1534 02:11:33,850 --> 02:11:37,190 comfortable with it. Do you have specific conditions that you would like? 1535 02:11:37,290 --> 02:11:40,850 No I actually was listening to what Commissioner Atwater was saying and I 1536 02:11:40,850 --> 02:11:45,790 agree with him about the height and making sure that getting out the 1537 02:11:45,790 --> 02:11:49,530 weeds of the height of the project but also the Commission is willing to 1538 02:11:49,530 --> 02:11:56,030 I'm sorry, but also if the Commission is willing to vote on this today, I'm willing to do that too. 1539 02:11:56,210 --> 02:12:07,310 Okay. So to be clear, would you like to have the applicant do something with that condition and bring it back to us? 1540 02:12:10,450 --> 02:12:17,950 I think if that's the only issue that's left on the table coming from me, I think that can be addressed in further conversations with Council. 1541 02:12:18,570 --> 02:12:23,630 I think that the benefit to the public, I think it's reasonable in the public interest. 1542 02:12:23,830 --> 02:12:27,870 There are no inconsistencies with this particular application. 1543 02:12:29,250 --> 02:12:31,670 Matthew did a great job spelling all that out. 1544 02:12:31,830 --> 02:12:34,170 It's hard to kind of argue with anything that he presented there. 1545 02:12:34,750 --> 02:12:37,570 I think we asked really good questions that staff were able to answer. 1546 02:12:39,050 --> 02:12:45,250 All that being said, I think I'm comfortable moving forward with the application as 1547 02:12:45,250 --> 02:12:46,810 it is and recommending approval. 1548 02:12:46,810 --> 02:12:53,830 In that case, I will entertain a motion. Commissioner Otwell. 1549 02:12:55,210 --> 02:13:00,450 With regards to Z-1225, I move to recommend adoption of the proposed consistency statement 1550 02:13:00,450 --> 02:13:05,830 dated August 12, 2025, contained in the agenda materials, and to recommend approval of 1551 02:13:05,830 --> 02:13:06,410 the zoning amendment. 1552 02:13:07,170 --> 02:13:07,550 Second. 1553 02:13:08,390 --> 02:13:13,030 Commissioner Otwell has made a motion for approval. Commissioner Fox has seconded the motion. 1554 02:13:13,030 --> 02:13:22,290 is there any further discussion? If not, all in favor? All opposed? Motion carries 1555 02:13:22,290 --> 02:13:27,270 9-0. Thank you all very much. Thank you to the public for coming out and 1556 02:13:27,270 --> 02:13:28,110 providing your comments. 1557 02:13:32,740 --> 02:13:37,780 That concludes new business. It's 11-15. Does anyone have 1558 02:13:37,780 --> 02:13:40,320 to leave like the next 15 minutes? 1559 02:13:42,750 --> 02:13:43,410 All right. 1560 02:13:50,500 --> 02:13:54,000 Next up, we'll wait for everyone 1561 02:13:54,000 --> 02:13:54,500 to leave. 1562 02:14:04,620 --> 02:14:11,780 Next up is the report of the chair. So welcome back everyone. It's 1563 02:14:11,780 --> 02:14:18,680 good to see you all. Just one reminder to use the Planning Commission email 1564 02:14:18,680 --> 02:14:24,180 address if you're going to be absent from a meeting because that copies 1565 02:14:24,180 --> 02:14:28,980 Bynam and Shanita so then everyone is in the know. I failed to announce at 1566 02:14:28,980 --> 02:14:34,140 the beginning of this meeting that Commissioner Shelburne had let us know he wouldn't be here. 1567 02:14:34,360 --> 02:14:42,560 So he is excused today. The other order of business is our committees. I believe I touched 1568 02:14:42,560 --> 02:14:49,020 base with all of you, either in person, we talked on the phone or I sent a text message. 1569 02:14:49,660 --> 02:14:55,560 Find them. Do you have this cheat for everybody? Okay. I am going to let you know. 1570 02:15:00,000 --> 02:15:05,960 Strategic planning, text change, infrastructure and mobility, which is fairly inactive unless 1571 02:15:05,960 --> 02:15:10,700 something specific comes up on that one. You'll be assigned to it, but that one rarely meets. 1572 02:15:11,120 --> 02:15:16,240 And then committee of the whole, as you know, is all of us. We'll get in touch with you about 1573 02:15:16,240 --> 02:15:20,800 when the committees will meet right now. Just note your assignment. Strategic planning. 1574 02:15:20,800 --> 02:15:29,660 Commissioner Miller is the Chair. The members are myself, Commissioner Burnett, Commissioner 1575 02:15:29,660 --> 02:15:36,840 Cochran, and Commissioner Shelburne. Text Change Committee, Chair is Commissioner Otwell. 1576 02:15:38,380 --> 02:15:44,700 Members are Commissioner Fox, Commissioners Neptune, O'Haver, and Omacaya. 1577 02:15:46,780 --> 02:15:47,740 Infrastructure 1578 02:15:47,740 --> 02:15:56,360 and Mobility. Chair is Commissioner Cochran. Members are commissioners Bennett, Neptune, 1579 02:15:56,940 --> 02:16:05,880 Omakaya, and Ottwell. And then again, Committee of the Whole is everyone. Find them. Do we 1580 02:16:05,880 --> 02:16:11,960 want to stick with the times that are set for right now? So I was going to say we'll 1581 02:16:11,960 --> 02:16:16,460 publish this information on the Planning Commission webpage. It'll also appear in 1582 02:16:16,460 --> 02:16:24,140 minutes next time as part of the direct the chairs report and then we do have set 1583 02:16:24,140 --> 02:16:28,560 standing times for all of the committee meetings and if you wanted to I can 1584 02:16:28,560 --> 02:16:35,500 stay with those that would be great okay so and then you make changes yeah 1585 02:16:35,500 --> 02:16:43,440 advise so strategic planning currently meets second Wednesday at four text 1586 02:16:43,440 --> 02:16:47,380 Change currently meets third Wednesday at four. 1587 02:16:49,780 --> 02:16:51,600 Infrastructure and mobility, which 1588 02:16:51,600 --> 02:16:59,400 again is inactive, meets fourth Thursday at three. Committee of the whole meets 1589 02:16:59,400 --> 02:17:06,060 fourth Thursday at four. So I'll leave it up to the chairs and the members if 1590 02:17:06,060 --> 02:17:09,980 you need to change those. If not, we'll stick with those standing times. I 1591 02:17:09,980 --> 02:17:13,820 believe the only committee that is set to meet this month is Committee of 1592 02:17:13,820 --> 02:17:18,980 the whole? Is it a text change committee? Oh, it's text change. I'm sorry. Text change. 1593 02:17:20,660 --> 02:17:25,940 And again, that's Commissioner Ottwell. So he'll be in touch with you all. Please let 1594 02:17:25,940 --> 02:17:31,460 your chair know if you will not be available for a committee meeting, because as you see, 1595 02:17:31,540 --> 02:17:35,140 those are much smaller. So it's important to have quorum. 1596 02:17:38,200 --> 02:17:43,600 And that is it for my report. We'll just go down the line for the report of the 1597 02:17:43,600 --> 02:17:45,520 members. Hi. 1598 02:17:47,840 --> 02:17:52,040 As noted committee of the whole generally meets the 4th Thursday of 1599 02:17:52,040 --> 02:17:56,060 the month which would have been September 25th however there are no 1600 02:17:56,060 --> 02:18:01,640 items. There's no items for August so we're projecting the September 25th as a 1601 02:18:01,640 --> 02:18:05,680 maybe. There may be an item but there are no items listed at this time. So no 1602 02:18:05,680 --> 02:18:10,360 August meeting. Thank you. I apologize I did no no August committee. No August 1603 02:18:10,360 --> 02:18:15,360 meeting. I did not announce that Commissioner Fox is chair of committee 1604 02:18:15,360 --> 02:18:20,060 of the whole as vice chair of the planning commission. I'm sorry, I apologize for the 1605 02:18:20,060 --> 02:18:27,040 slight. There's no slight, we're good. Commissioner Otwell. Thank you Chair Bennett 1606 02:18:27,040 --> 02:18:31,240 and to all the wonderful folks now on the text change committee we do have a 1607 02:18:31,240 --> 02:18:35,620 meeting coming up this month August 20th. It'll be in the Raleigh Municipal 1608 02:18:35,620 --> 02:18:41,180 Building Room 305. We're going to talk about RHDC updates and Greenway 1609 02:18:41,180 --> 02:18:44,760 amendments. Those are already on the portal so we can start reading about them. 1610 02:18:44,760 --> 02:18:52,180 I do want to offer a clarification. The RHDC text change will be in front of the 1611 02:18:52,180 --> 02:18:57,320 I'm sorry the preservation text change TC324 will be in front of RHDC on the 1612 02:18:57,320 --> 02:19:01,920 10th of September and won't come to text change committee until the 17th 1613 02:19:01,920 --> 02:19:05,780 but you will discuss Greenway TC325. 1614 02:19:06,140 --> 02:19:09,560 It's confusing because they're both TC3 from two different years. 1615 02:19:10,940 --> 02:19:13,820 Excellent. We look forward to having a Greenway discussion. 1616 02:19:14,880 --> 02:19:17,560 Do you want to try to get, see if you have quorum right now? 1617 02:19:17,980 --> 02:19:22,060 Does anybody know if they will be unavailable to meet at 4pm on 1618 02:19:22,060 --> 02:19:27,640 August 20th? I can confirm. Availability 1619 02:19:27,640 --> 02:19:31,690 on August 20th. 4 o'clock. 1620 02:19:31,690 --> 02:19:32,030 One more. 1621 02:19:32,570 --> 02:19:33,830 We only need three of the five. 1622 02:19:35,610 --> 02:19:36,570 I think you have three. 1623 02:19:36,790 --> 02:19:37,570 Oh, all right. 1624 02:19:39,930 --> 02:19:41,070 OK, Commissioner Neptune. 1625 02:19:41,790 --> 02:19:42,930 Thank you, Madam Chair. 1626 02:19:43,350 --> 02:19:46,030 Just a brief note of gratitude to our colleagues and staff. 1627 02:19:46,270 --> 02:19:48,810 Over the last month, I had the privilege 1628 02:19:48,810 --> 02:19:53,130 of working and coordinating with Bynum and Sarah, 1629 02:19:53,290 --> 02:19:55,850 I would say Shaughnessy, and others in our planning 1630 02:19:55,850 --> 02:19:56,810 and development department. 1631 02:19:57,010 --> 02:19:59,810 They came through with a city block building activity 1632 02:19:59,810 --> 02:20:04,310 for a larger public event involving our mayor and a conversation around growth and development 1633 02:20:04,310 --> 02:20:08,910 in the city. And I just really appreciated our colleagues and staff being there with 1634 02:20:08,910 --> 02:20:14,190 this block building activity. We also had colleagues from City Transportation who 1635 02:20:14,190 --> 02:20:20,130 were present, so I just, you know, won't recall everyone's names at this immediate 1636 02:20:20,130 --> 02:20:23,650 moment in time, but I'm deeply grateful for everybody who was present for the event 1637 02:20:23,650 --> 02:20:29,030 engaging with our larger public. So thank you to our colleagues on planning and development 1638 02:20:29,030 --> 02:20:31,830 and transportation staff. Deeply appreciate all of you. 1639 02:20:33,230 --> 02:20:34,070 Mr. Cochran? 1640 02:20:35,090 --> 02:20:39,270 I just wanted to say thank you for trusting me with the Infrastructure and Mobility Committee. 1641 02:20:39,870 --> 02:20:44,070 I look forward to maybe having a meeting this year and learning what it does. 1642 02:20:47,630 --> 02:20:48,590 No reports. 1643 02:20:51,420 --> 02:20:56,240 No reports, but I hope everybody had a great break. We had an awesome time at lunch, 1644 02:20:56,840 --> 02:21:00,380 which was wonderful. So I am glad I have had the opportunity to get a chance to 1645 02:21:00,380 --> 02:21:03,420 get to know the commissioners more and I look forward to more of those opportunities in the 1646 02:21:03,420 --> 02:21:03,640 future. 1647 02:21:04,880 --> 02:21:05,680 Commissioner Miller. 1648 02:21:07,480 --> 02:21:12,140 The Strategic Planning Committee has no items on the agenda to my knowledge and will not 1649 02:21:12,140 --> 02:21:13,060 meet in August. 1650 02:21:14,180 --> 02:21:17,520 And well done on the first, do you have a first meeting? 1651 02:21:17,660 --> 02:21:18,080 Thank you. 1652 02:21:18,280 --> 02:21:19,640 Thank you very much. 1653 02:21:20,820 --> 02:21:21,800 Commissioner O'Haver. 1654 02:21:23,060 --> 02:21:27,660 I always say I like to go last, but Blaney took my thunder on that one. 1655 02:21:28,040 --> 02:21:28,640 Nice job. 1656 02:21:29,360 --> 02:21:33,800 I'm unfortunately not available on the Planning Commission meeting on the 26th. 1657 02:21:36,420 --> 02:21:38,840 Email us for the record. 1658 02:21:42,150 --> 02:21:45,570 Now we will turn to the report of the Assistant Director. 1659 02:21:50,500 --> 02:21:52,400 You've all noticed we have a new agenda system. 1660 02:21:53,560 --> 02:21:55,360 Nice job jumping in the pool. 1661 02:21:55,980 --> 02:21:58,820 First meeting back. Appreciate you all rolling with it. 1662 02:22:01,260 --> 02:22:03,120 Busy meeting coming up on the 26th. 1663 02:22:03,780 --> 02:22:05,020 A lot of new business there. 1664 02:22:05,020 --> 02:22:10,480 expected and I don't think I have anything else. Thank you for your support. 1665 02:22:11,180 --> 02:22:16,560 I've done it on a first meeting. Thank you. Any other business? 1666 02:22:23,990 --> 02:22:25,310 Did you get an 1667 02:22:25,310 --> 02:22:30,950 email with the agenda? If you click on that link it'll take you to the agenda 1668 02:22:30,950 --> 02:22:35,510 and each case has a link. I can say a little bit more about the agenda if you 1669 02:22:36,610 --> 02:22:44,410 visit the council boards and agendas page which you all get a link to as I 1670 02:22:44,410 --> 02:22:46,770 understand it the planning commission distribution list is now working properly 1671 02:22:46,770 --> 02:22:51,930 for everyone who is appointed to the commission. Thank you IT. When you launch 1672 02:22:51,930 --> 02:22:57,370 that agenda there are blue titles and when you click on that on the right 1673 02:22:57,370 --> 02:23:01,910 hand side of the page you will see all the attachments pop up and you can see 1674 02:23:01,910 --> 02:23:08,810 like the staff presentation, the staff report, the engagement report. There are, 1675 02:23:09,150 --> 02:23:14,490 what else is there, so many pieces of business. Consistency statement for 1676 02:23:14,490 --> 02:23:21,330 approval or denial. So all those pieces would be there for you. You 1677 02:23:26,580 --> 02:23:27,100 can also get 1678 02:23:27,100 --> 02:23:30,120 there from the Planning Commission webpage if you visit RaleighNC.gov 1679 02:23:30,120 --> 02:23:37,620 slash planning dash commission Cassidy one of our helpful city clerks is here 1680 02:23:37,620 --> 02:23:42,700 and I think gonna show you a little demo while she's doing that I have a quick 1681 02:23:42,700 --> 02:23:48,680 question for staff is it Margaret Tartala in the audience I think it was I 1682 02:23:48,680 --> 02:23:51,460 just want to I just I recognize her I just I couldn't immediately remember 1683 02:23:51,460 --> 02:23:54,460 her name but our colleague I think from city transportation Margaret 1684 02:23:54,460 --> 02:23:58,580 Tartala was the one with us at this event with you know planning and 1685 02:23:58,580 --> 02:24:02,960 developments. I just want to recognize, I see her. And now I just remember your name. 1686 02:24:03,100 --> 02:24:06,400 So it's, again, thank you, Margaret Tartala, for being there with us. 1687 02:24:06,800 --> 02:24:06,800 Yeah. 1688 02:24:10,730 --> 02:24:14,950 I'm sorry, this is unplanned. But just for this, since this is new for the sake 1689 02:24:14,950 --> 02:24:21,450 of everybody, you'll see from the Planning Commission page there's a link to upcoming 1690 02:24:21,450 --> 02:24:26,730 Board and Commission meetings, which has agenda in minutes. As Planning Commission 1691 02:24:26,730 --> 02:24:31,510 is the first and only at this point board to be moved over to the new system. 1692 02:24:32,710 --> 02:24:40,010 It's the only one listed here and you will see PDF, HTML, the video which this is a good 1693 02:24:40,010 --> 02:24:44,130 example of the HTML which I would probably recommend if you're following along in the 1694 02:24:44,130 --> 02:24:49,150 meeting because it has the video over to the side after the fact you know that'll 1695 02:24:49,150 --> 02:24:53,990 be time stamps so people can click the item that they're interested in it will pull 1696 02:24:53,990 --> 02:25:00,550 up over to the side. If you click the item, as Bina mentioned, it'll list all the attachments 1697 02:25:00,550 --> 02:25:05,890 here that you can click. So this is the HTML view in my opinion is kind of the nice cohesive 1698 02:25:06,730 --> 02:25:13,950 view of everything. So not an e-scribe expert, but that's probably the best way to 1699 02:25:13,950 --> 02:25:21,670 call along. Thank you. Anything else? If not, we're adjourned.