[0:09] Good evening. I'd like to welcome [0:11] everyone to the Village of Riverside [0:13] Board of Trustees regular meeting of [0:16] Thursday, March 19th, 2026. [0:20] Uh please stand as you're able and join [0:22] me in the pledge of allegiance. [0:26] I pledge algiance to the flag of the [0:29] United States of America and to the [0:32] republic for which it stands. One nation [0:35] under God, indivisible, with liberty and [0:39] justice for all. [0:44] » Clerk Stenzel, please call the role. [0:46] » Trusty Marsha, [0:47] » Here. [0:47] » Trusty Gallagher here. [0:48] » Trusty CS [0:49] » Here. [0:50] » Trusty Evans here. [0:51] » Trusty Mateo here. [0:52] » Trusty Fitzgerald here. Manager Francis [0:54] » Here. President Pollock [0:55] » Here. [0:56] » Also, President Clerk Stenzel. [0:59] » Uh we have a brief president's report. [1:01] Uh upcoming village meetings include the [1:04] following. Uh March 23rd, Parks and [1:07] Recreation Board regular meeting. [1:10] Riverside Public Library at 6:30 p.m. [1:15] March 25th, Planning and Zoning [1:17] Commission regular meeting at uh here at [1:21] the Village Hall Town Hall. uh room 4 [1:23] 6:30 p.m. And our next regular scheduled [1:27] meeting is April 2nd. Uh same time, same [1:31] place, 6:30 p.m. Town Hall. [1:36] Uh that concludes my president's report. [1:38] Do we have any trustee reports this [1:40] evening? [1:43] There are none. Uh Manager Francis, [1:46] manager's report. [1:47] » Thank you. I have two items to update [1:50] the board and the public on. One being [1:52] um the board might have seen that Joel [1:55] Kennedy is starting to work on parkway [1:58] restorations from lead service lines [2:00] that were installed last year. Um so [2:04] this will be firsttime restorations in [2:06] the parkway and also any areas that have [2:08] subsided over the winter will be [2:10] restored as well. Another item that will [2:13] begin soon is Nyor's restoration over on [2:16] Cowi. They'll be restoring the roadway, [2:19] curbs, sidewalk, and um the parkway. [2:24] There will be a detour when that work [2:26] begins. Uh public works staff is working [2:29] on obtaining the details and [2:30] coordinating through Nyore and their [2:33] contractors. Once the village has [2:34] received that information regarding the [2:36] detour and the timing, we will share it [2:38] with the public. As of this evening, we [2:41] don't have confirmed dates, but as soon [2:43] as we do, we will send those out. That [2:45] is all I have this evening. [2:47] Thank you. Uh public comments for [2:50] non-aggenda items. Is there anyone in [2:52] attendance who would like to address the [2:54] board uh on a matter that is not on our [2:56] agenda tonight? Uh knowing that uh as we [2:59] go through the agenda, there'll be [3:01] public comments on those specific items. [3:04] There are none. Uh consent agenda. Clerk [3:07] Stenzel, please read the consent agenda. [3:10] » Approve voucher list of bills March [3:12] 19th, 2026. Approve village board of [3:14] trustees regular meeting minutes March [3:16] 19th, 2026. Approve village village [3:20] board of trustees executive meeting [3:21] minutes March 5th, 2026. The previous [3:24] one was also March 5th. Review and file [3:26] board and commission minutes economic [3:28] development commission regular meeting [3:29] minutes January 14th, 2026. Landscape [3:32] Advisory Commission regular meeting [3:34] minutes February 10th, 2026. Historical [3:37] commission regular meeting minutes [3:38] February 16th, 2026. Review and file [3:41] department reports. Public works [3:43] February 2026 finance February 2026 [3:48] 2025 community development annual report [3:51] and 2025 public safety annual report. [3:55] A resolution authorizing the village [3:56] manager to create a purchase order in [3:58] the amount of $174,900 [4:02] for Christopher B. Burke Engineering to [4:05] provide professional design and [4:06] constructive engineering services as [4:08] part of the South Coat Road res. [4:12] An ordinance amending the village code [4:13] relative to beekeeping and henkeeping [4:15] and amending a fee schedule for the [4:16] village riverside. An approval of facade [4:19] grant application for Salme 35 East [4:22] Burlington. [4:23] » Do any of these items uh need to be [4:26] removed from the consent agenda? [4:28] Uh there are none. I'd ask for a motion [4:31] and a second to approve the consent [4:32] agenda. [4:33] » So moved. [4:34] » Second. [4:35] » Motion and second. Clerk Stenzel, please [4:36] call the role. [4:37] » Trusty Marsha. [4:38] » I. [4:39] » Trusty Galgas. [4:39] » Hi. [4:40] » Trusty Cos. [4:40] » I. [4:40] » Trusty Evans. [4:42] » I. [4:42] » Trusty Matteo. [4:43] » I. [4:43] » Trusty Fitzgerald. [4:44] » Hi. [4:45] » Motion carries. Uh, department board and [4:47] commission reports. We have an update [4:49] this evening from for from the parks and [4:52] recreation department. Assistant [4:54] director Megan Cisa will provide that [4:56] report. [4:59] Good evening, President Pollock, village [5:01] trustees, manager Francis. I just wanted [5:04] to provide you all with a quick update [5:05] on some events and programs that we have [5:07] coming up as we move into the spring [5:09] season. Our variety of egg hunt events [5:11] will take place later this month. We [5:13] will kick off the egg hunt festivities [5:15] with our teen flashlight egg hunt that [5:18] will take place next Thursday, March [5:20] 26th, over at Indian Gardens. The hunt [5:23] will begin at 7:45 p.m. and we invite [5:26] those that are 11 to 15 to join us for [5:28] that. Just be sure to bring a basket and [5:30] a flashlight with you. We will follow [5:33] that up with our annual egg hunt which [5:34] will take place on Saturday, March 28th [5:36] over at Big Ballpark. We will begin our [5:38] age groups promptly at 10:00 a.m. and we [5:41] invite those that are 10 and under to [5:43] join us for that. The bunny will also be [5:45] available at that event for photos. And [5:47] then we will conclude our egg hunt [5:49] events with our golden egg hunt which [5:51] will take place from March 31st to April [5:53] 2nd. Each day in that time frame, new [5:56] golden eggs will be hidden in the parks. [5:58] Each golden egg that's found is going to [6:00] be eligible for a $10 parks and recck [6:01] certificate to use toward any future [6:03] program or event. Moving on to [6:06] programming that we have, we've got a [6:08] variety of programs that are beginning [6:09] in the next few weeks. Some upcoming [6:11] adult programs that we have are cardio [6:13] kickboxing, weight training, Zumba, [6:16] yoga. We have a Mother's Day paint and [6:18] sip, and dodgeball and pickle ball [6:20] tournaments. And then some upcoming [6:22] youth programs include a spring break [6:24] art camp, flag football, and spring [6:26] soccer, as well as our ongoing nature [6:28] programs such as Saturdays in the Woods, [6:30] and Earth Day nature hike. And speaking [6:33] of programming, our summer program [6:35] brochure will release in May with all of [6:36] our summer programs, classes, and [6:38] events. Be sure to keep an eye out in [6:40] your mail for our seasonal brochure [6:42] mailer that will come out to announce [6:43] when that is released. And lastly, we're [6:46] very excited to announce our brand new [6:48] weekly newsletter for Riverside Parks [6:50] and Recreation. Every Tuesday, we will [6:52] release a newsletter to your email [6:54] that's going to include some exciting [6:55] upcoming programs and events. This is [6:57] going to be the best way to keep up to [6:59] date with all things Riverside Parks and [7:01] Wreck. We did send out an initial signup [7:03] email as well as our first newsletter. [7:05] And if you did not receive that, you are [7:07] able to sign up um with the QR code [7:09] that's been posted both to the Riverside [7:11] Parks and Recck Facebook page as well as [7:12] the village p Facebook page. Thanks. [7:16] » Thank you. Any questions for assistant [7:19] director Cisco? I would just make one [7:22] comment. Um [7:24] » Since we adopted Well, first of all, [7:27] thank you for the update on the [7:28] programs. Uh, spring is here, so it's [7:31] time to get out, get outside and sign up [7:34] for a program. But I also want to take [7:36] this opportunity to thank the parks and [7:39] recreation department and parks and [7:41] recreation board on the tremendous [7:44] success, in my opinion, you've had [7:46] already in implementing your master plan [7:48] for 2025. We've already got funding for [7:52] for uh uh Turtle Park uh and um and Ble [7:59] Park, right? Yeah. Ble uh funding and [8:02] that's in the pipeline. And we're hoping [8:05] to follow that up with Harrington next [8:07] summer. And uh also the parks and [8:10] recreation board will be considering [8:12] another goal from the master plan of [8:14] creating zoning for the uh parks and [8:17] open space in the village. So, thank you [8:20] to the department and the board. [8:22] » Thank you very much. [8:25] » Uh, pending business, um, presentation [8:29] and discussion of new public safety [8:31] facility visualization concepts. Manager [8:34] Francis, [8:35] » Thank you. Um we do have the team from [8:38] Williams Architects that will walk the [8:40] village board through um the different [8:43] schemes and designs for the board to [8:46] take a look at and provide some feedback [8:48] on. Additionally, I just wanted to [8:51] provide the board a brief update after [8:53] this evening. Um the next step based on [8:56] the feedback that's received, Williams [8:59] will then attend a preservation [9:00] commission meeting and get additional [9:02] feedback based on the narrow down down [9:05] designs that the village board wants [9:08] preservation to react to and give [9:10] additional feedback. So with I will turn [9:13] it over to the Williams team. [9:18] » Good. Good evening, President Pollock, [9:20] village trustees manager Francis. um [9:23] happy to be here again tonight and um [9:26] we'll have all four of our team members [9:28] presenting um this evening a lot of [9:30] information about the concept. So um [9:32] let's just get right into it and next [9:36] please. So we want to just bring you up [9:38] to speed um as to where we've been um [9:42] what we've been working on for the last [9:43] few months and ultimately the four [9:46] different ideas we have um for the [9:48] exterior of the project. Um, we also [9:51] have partnered with harbor contractors [9:54] and Chris Kak is here tonight to tell [9:56] you a little bit about where costs are [9:58] projected at the moment as well as some [10:00] ideas to um perhaps um bring costs down. [10:04] At this point, we are um simply looking [10:07] for feedback from you as the village [10:10] board um what you like, what you don't [10:12] like um in terms of the exterior concept [10:14] so we can continue to move forward and [10:17] and refine. But most of all, we want to [10:19] make sure we're answering your questions [10:20] and keeping you as informed as possible [10:22] about the proposal. [10:25] So, um I sort of just gave away the the [10:28] updates. Um we've worked um had several [10:31] meetings with staff. Um we've um put [10:35] together um four very um distinct [10:38] concepts um for the exterior. We've also [10:42] really validated the work that you've [10:44] seen so far by engaging a civil engineer [10:47] and a structural engineer to make sure [10:49] that we really understand the site to [10:51] confirm that we do not need to do [10:54] anything further in terms of storm water [10:56] um detention which we have confirmed and [10:59] to understand um how we would be [11:02] actually structuring this in [11:03] consultation with a structural engineer. [11:05] So um there is a measure of um [11:09] architectural and engineering [11:11] feasibility that are baked into these [11:13] concepts that we're um going to show you [11:15] tonight and talked a little bit about [11:17] next steps as manager Francis mentioned [11:20] um we're ready to move um upon your [11:22] direction into design adjustments and [11:25] review um by the preservation commission [11:28] and to begin the community engagement [11:30] process around this project. [11:33] Um, so with that, um, I will turn it [11:35] over to our project manager, Kim Nigro, [11:37] to recap the site plan and the floor [11:40] plans and then we'll move to the [11:41] exterior concepts. Thank you. [11:47] » Thank you everyone. Glad to be back with [11:49] you. Um, I'll just start by recapping [11:51] the um, site plan and floor plans. um [11:54] some of which most of which you saw at [11:56] our last presentation but it has been [11:58] refined based on your feedback and um [12:01] some consensus um about the various [12:03] schemes that we presented at our last [12:04] meeting. So um [12:08] oh good this works. Oh thank you sorry [12:10] just getting back off. Thank you chief. [12:14] So um just to give you the brief quick [12:17] overview of the site plan of the various [12:19] schemes that we presented last time. The [12:21] main difference was whether the [12:23] apparatus bay would be um flanked by the [12:26] apparatus support to the east or more or [12:29] whether that support bar would be more [12:31] in the center of the overall layout [12:33] based on again feedback from all of you [12:36] and more conversations with the manager [12:38] and chief. Um the decision was that [12:41] keeping the apparatus bays more um [12:44] toward the center and putting that [12:46] support on the outside edge um provided [12:48] a couple of different benefits within [12:50] the plan layout itself as well as on the [12:52] site. So this allows that apparatus [12:55] apron to be a little further away from [12:57] the drive down to the lower level. Um [12:59] provides that surface level parking here [13:02] for staff to come in quickly. Um and [13:04] then we've also again still focusing on [13:08] the community and public space here as a [13:11] light touched link to the existing [13:14] village hall. Um based on the feedback [13:17] again, we've focused the entryway right [13:19] here on axis with the colonade or view [13:23] connection out toward the river. Um and [13:26] and as you'll start to see in the [13:27] exterior schemes that we'll show you, um [13:30] all of the schemes have this layout on [13:33] site. All of the schemes have the same [13:35] kind of axis and exterior um colonade [13:39] and patio space um and you know are [13:44] basically all in the same massing and [13:46] form on the site. [13:51] So this um lower level plan really again [13:54] hasn't changed since you last saw it. um [13:56] parking available for um police here on [14:00] the lower level, entrance uh for staff [14:02] to a staff stair that takes them um or [14:05] through the elevator securely up to [14:08] secure administrative space on the [14:10] second floor. Um and then keeping kind [14:13] of the basic storage of the building [14:16] under the apparatus bay on this end and [14:18] the evidence processing and storage here [14:21] um near where they would enter and then [14:23] the utilities on the far end. [14:29] So, this again, as I kind of recapped on [14:31] the site plan, the main floor level has [14:34] um this community space around the lobby [14:37] here with the public conference room and [14:40] toilets and the you we're saying [14:42] ornamental stair that really just means [14:43] open, not an enclosed fire stair. um and [14:47] space for displaying of the historic [14:49] firet truck and um potential [14:52] repositioning of some um village hall [14:55] space in the in the existing village [14:58] hall. Uh and again that really nicely [15:01] consolidated shared administrative space [15:04] between police and fire. And then as we [15:07] move to the east, the um apparatus and [15:11] the support zones um for the apparatus [15:14] bay. [15:18] And on the upper level, again, all of [15:21] the community space is focused here on [15:23] the west end where they could come up [15:25] this public stair, access restrooms, [15:28] access the fitness space, um, come down [15:31] this public corridor all the way through [15:33] to the public terrace, um, and to the [15:36] community space, which is has access to [15:39] Riverside TV, the kitchen, and some [15:42] storage. So, the elevator is here [15:46] centrally located. this would have [15:48] public access at this level. Um, also if [15:51] police or fire needed to use that [15:53] elevator at this upper level, they can [15:55] do that and then come into a secure [15:58] corridor [15:59] where most of the police functions are [16:01] are focused right here with a men's [16:04] locker room and toilet and showers, [16:06] women's locker room, toilet and showers, [16:08] and then as you move on, um, this shared [16:11] kitchen, dining and day room space, and [16:14] then the more private bunk rooms and [16:17] lockers for fire and EMS personnel. [16:20] Well, that was one of the comments from [16:21] the last meeting was um liking them [16:24] having kind of their own quieter wing [16:25] over here um on the other side of the [16:28] apparatus bay. So, yeah, again, just [16:32] more public zone shared and and more [16:35] quiet private on the end. [16:38] So, with that, I'm going to move into um [16:41] exterior schemes unless anyone has any [16:43] thoughts or questions about the plan [16:45] recap. [16:47] So, I want to start by again kind of [16:50] talking about what's in common with the [16:51] four different schemes that we've looked [16:53] at. Um we've tried to take our cues um [16:56] based on listening to chief and uh um [17:00] manager and and all of the committee [17:03] about paying reverence to this historic [17:06] village hall but not trying to imitate [17:08] it. understanding the cues that we're [17:10] receiving from the proportions of the [17:12] building and um respecting that, [17:16] following that language, but creating a [17:19] new um design for this new um facility. [17:23] So, we've done things like looking at [17:25] the strong horizontal masonry banding of [17:28] this building and taking some cues from [17:30] that. We've looked at these the strong [17:32] corner vertical elements with the [17:34] turrets and taking some cues from that. [17:37] Um and then we've um because of the [17:40] large footprint of this plan as compared [17:42] to this building, we've tried to break [17:44] it down into clear those same kind of [17:47] clear functions of public administrative [17:51] fire and you know make sure that it's [17:54] not looking like a vast facade by [17:56] comparison to this building. and at the [17:58] same time wanting to um celebrate the [18:01] height of this building while keeping [18:04] this new facility lower. Again, because [18:07] it is um wider, a little larger in [18:10] footprint, we wanted to not have it also [18:12] be as tall and competing with this facil [18:15] this structure in that in that way as [18:17] well. [18:20] So, we've kind of named each of these [18:22] schemes so that you have a little [18:23] something to remember. It's it's going [18:25] to be a lot that we go through tonight. [18:26] So, I want um you to be able to refer [18:29] back to which was that scheme. So, we've [18:31] named this one dynamic response. And so, [18:34] scheme one uh really started around a [18:37] desire to um look at how closely we are [18:42] situated up against the village hall, [18:44] but give it a little bit of room to [18:45] breathe. So, um that footprint that in [18:48] plan was pretty square. In this version, [18:51] we're sort of um angling a few of the [18:54] walls, mostly this colonade that kind of [18:56] leads you through to the river and [18:58] bending right around this point where we [19:01] get tight at this turret. Um and so the [19:05] idea was that as you enter in the [19:07] facade, this the this column structure [19:10] feels wider, feels welcoming, kind of [19:13] funnels you into the space and then [19:16] widens again at the back, opens up again [19:18] at the terrace. So you feel that kind of [19:20] dynamic um movement as you as a you know [19:24] from someone from the community coming [19:26] to that space. And then again as I'd [19:28] mentioned um we've taken these these um [19:33] horizontal banding of the facility and [19:36] kind of mirrored that um in terms of the [19:39] proportions of overall and then breaking [19:42] this community space down separately in [19:45] mass from the apparatus bays and the [19:48] support zone on the end. And in talking [19:51] about some kind of tower anchoring [19:53] elements vertically in each scheme, [19:55] you'll see kind of this repeating um [19:58] vertical elements that um you know give [20:01] some repeat the rhythm of these [20:03] elements. [20:07] So this gives that view kind of right [20:09] through the entry and through um to the [20:11] green space along the river. And you can [20:14] kind of see those columns begin to [20:16] repeat leading you in. This would be [20:19] that historic um firetruck display could [20:21] could be on either side and and then uh [20:24] the public conference room and fitness [20:26] here. So it is glassier on this front [20:28] area. This is where those community [20:29] spaces would be. [20:37] And then as we each of these images will [20:39] kind of move you around to the south [20:41] toward the river as we And so this again [20:44] is that um oop sorry [20:48] the um bunk rooms here and some light [20:51] into the apparatus bay um support spaces [20:56] some lighting into stair towers [21:01] and on the back again um having kind of [21:05] expressing these [21:07] um ramps and and this dynamic um sort of [21:12] angular shapes again where you emerge [21:14] from the building with this colonade. Um [21:17] and then having that repeating that kind [21:20] of angled shading at the community [21:23] terrace as well. [21:30] And so then as you approach from the [21:31] river, walk from the west, you would [21:35] enter this public patio level. And then [21:39] again, there's the terrace um that's [21:42] supported by that colonade up at the [21:44] community room level. [21:48] I should have said in the beginning, [21:50] each of these schemes might have [21:52] elements or aspects that you like. They [21:54] they are all somewhat interchangeable. [21:56] if there's some aspect of scheme one [21:58] that you feel like would also work or be [22:01] celebrated in scheme three. Um just like [22:04] with the plans, you know, we want to [22:06] show you these four options as a way of [22:08] showing a lot of different ideas and [22:10] then taking that feedback and and [22:12] working them in together. [22:16] So there's kind of an aerial view where [22:18] you can see that bending um a little [22:21] more a little more clearly illustrated. [22:24] And then the apparatus bay roof would be [22:28] set a little lower to allow some [22:29] daylighting in along the um living [22:32] dining uh day room spaces. [22:43] Okay, move on to scheme number two. [22:47] Oh, I one more. Sorry. Elevations. So [22:50] the the flat elevations we thought were [22:52] kind of helpful to really look at the [22:54] scale of this building compared to those [22:57] historical datms and lines in the [22:59] masonry and how we're kind of pulling [23:01] those through and then how we're kind of [23:03] breaking down this eastern facade that's [23:07] facing more towards the residential [23:08] areas with more punched opening smaller [23:10] scale windows to keep that looking [23:14] appealing. [23:17] Okay. [23:25] Good evening. Uh again, uh president, [23:27] board, and uh and staff. Happy to be [23:29] back, uh here with you all. Uh so this [23:32] is I've got control here, right? Uh [23:34] forward and back. All right. Um as uh as [23:38] Kim shared, uh these images will take [23:40] you on a walk around uh each one of the [23:43] schemes. Uh, another thing I wanted to [23:46] mention with these, as you see, we're [23:48] showing this in a very light, um, just [23:50] kind of off-white collar with a little [23:51] hint of material. So, uh, to build on, [23:54] uh, a bit of what was said, we're [23:56] beginning to hint at materiality. So, [23:58] uh, keeping that in mind, too, like the [24:00] kind of interchangeability of ideas with [24:02] these schemes, some of these lend [24:04] themselves to, uh, inherently a little [24:06] bit more of a traditional look. Uh, but [24:09] even the more modern look uh, could use [24:12] more traditional materials. masonry or [24:14] or wood cladding and different things [24:16] that could uh kind of help bridge the [24:18] gap between the the new and the old. So, [24:20] just keeping that in mind, we we've [24:21] intentionally left these a little bit of [24:23] a blank slate with that um material uh [24:26] flexibility in mind. So, uh I'll take [24:29] you around this one that we're calling [24:31] um contextual presence. And uh as you [24:34] see immediately it feels a little more [24:36] traditional, a little more in uh uh in [24:39] tune maybe with the the traditional [24:41] architecture of the adjacent building. [24:43] Uh but yeah, very interested to have you [24:46] all review all these and and give us [24:48] your thoughts uh if we're finding that [24:51] balance. Um so the uh entry through the [24:56] middle there, you've got the view [24:58] through and hint of the the river [25:00] beyond. We've got the historic engine [25:02] number three. uh tucked into the the [25:04] space between the buildings on this one [25:06] and this one you see we've we've kept a [25:08] little further away than scheme one. So [25:10] you also see the view to the sky beyond [25:14] um and with the tight program there [25:16] there's uh moves that we make with these [25:18] like with this one you see the upper [25:20] level begins to pull forward a bit. So [25:22] by um kind of tight moving it further [25:24] away from the village hall we we flex [25:27] and scoot the spaces forward a little [25:28] bit. So, just a subtle difference that [25:30] you'll see with some of these. Um, so [25:33] here we're moving around um to the [25:35] northeast. Uh, this one uh also does the [25:39] the moves with the massing to step down [25:41] and then step back up uh at the corners. [25:45] Uh here's the view from the swinging [25:46] bridge of the um south facade. Those [25:50] views into the living spaces and then [25:53] the much larger glazed opening into the [25:56] community room on the upper level. [25:59] Uh this one uh still has as all of them [26:02] have the upper and lower um terrace on [26:04] the river side uh but with a more pulled [26:08] back overhang. [26:10] Um here's the view from the potential [26:14] riverwalk uh coming up from the [26:17] southwest. [26:20] And uh note again note the the large [26:23] windows into and out of the um the [26:26] community room. Here's the aerial [26:32] from the northeast and then the other [26:34] aerial from the southwest. And also [26:36] wanted to point out from the southwest [26:38] views, you'll see a little hint of what [26:40] we were thinking of as a potential um [26:42] art wall on the what's currently a a [26:45] literal blank slate on the back side of [26:47] the uh the village hall where we just [26:49] have the lap siding there. Uh our [26:51] thought was this could with um the [26:53] adjacency of the new public space could [26:55] be an opportunity for a mural or or art [26:57] wall of some kind. So you'll see that in [26:59] in all of the schemes. Um the other um [27:04] unique difference on this one uh a much [27:06] more um like curve linear approach to [27:09] the riverw walk. And with all of these [27:10] schemes, uh you'll you'll also see how [27:13] in collaboration with our um uh civil [27:16] engineers, we're we're retaining that or [27:18] we're keeping the existing retaining [27:20] wall and any proposed new work is being [27:22] held back from that retaining wall from [27:24] the river. So, uh subtle detail on those [27:27] riverwalk schemes. There's um the [27:30] elevations. [27:34] Uh and um we're only we were only [27:36] showing the like the primary public [27:38] elevations. Um but we've kind of studied [27:40] as you saw in the 3Ds the the the [27:42] alignment um on all sides. [27:49] And moving on um to the um next one. I'm [27:52] going to take the middle two and then [27:53] I'll hand it uh hand it off to another [27:55] member so you don't have to hear from [27:56] one of us for too long. Uh so this one [27:59] we're calling um spatial framing. And uh [28:02] what you'll start to see with this one [28:04] is this theme of kind of linear bands [28:06] that uh that encircle and frame certain [28:08] spaces or views uh around the building. [28:11] So um there at the entry, this piece [28:15] that rises up and frames that entry and [28:17] the view through. And you see a hint of [28:18] another framing element on the far side, [28:20] which you'll see as we move around. [28:25] Uh here we've got the the stair towers, [28:27] very similar massing to the others [28:29] responding to that program, but rather [28:31] than the kind of capped tower, it's got [28:33] this uh framing element that that um uh [28:36] frames the tower with some glazing in [28:38] there to provide light into the stair [28:40] tower. [28:42] Here's the view from the swinging bridge [28:44] with the articulation of the south [28:46] facade. uh more of those um boxed [28:49] elements around there which as you start [28:51] to see in this view and you'll see in [28:52] the other ones as well the articulation [28:54] on the south we begin to push and pull a [28:56] little bit to provide solar control on [28:58] the south uh the lighting here is based [29:00] on accurate um sun uh light that would [29:03] hit the building at different times in [29:04] the year uh so you can see how in like [29:07] morning light in I forget what day we [29:09] based this on but the those elements [29:12] that come out are providing important um [29:14] feature to help prevent glare and direct [29:16] uh heat gain coming into those spaces [29:18] while still uh allowing views out. [29:22] This one uh has that framing around that [29:24] upper piece. So uh still open to the [29:27] river but a little more enclosed. [29:31] Here's the view uh approaching down the [29:35] possible riverwalk extension [29:39] uh and the aerial views. [29:47] Yeah. So, more of a angular kind of [29:49] river walk uh scheme shown on this one. [29:52] And you'll notice with all of these, we [29:54] we were providing some like stepping [29:56] terracing or like potential little [29:57] planter areas that would provide uh [29:59] engagement on the the riverwalk and [30:02] terrace as well. [30:04] Here's those elevations. [30:12] All right, I'll hand it back to Kim. [30:14] » Thank you. [30:16] So, um, this final scheme, we wanted to, [30:20] um, certainly show a version that did [30:22] have, um, pitched roofs and take a [30:26] little bit of a cue from this building [30:27] in that way, while at the same time not [30:30] going quite for the steepness that this [30:31] building has. This is not a building of [30:33] that era, and we don't want to again [30:35] compete with with this building in that [30:37] way. So, um, but we did want to do a [30:40] version to show you where we use those [30:43] different roof shapes again to anchor [30:45] these, um, sort of towers at the corner [30:47] and and give presence to the entryway. [30:50] Um so um the other thing about this [30:52] scheme and why we're calling it [30:54] traditional anchoring is we're also [30:56] exploring some other ideas of smaller [31:00] punched openings um that might lend [31:02] itself more to an overall masonry [31:04] construction again a little more like [31:06] the village hall. And like Joe said, um [31:09] the materiality is going to be another [31:11] opportunity to relate back to this [31:13] building in terms of color and materials [31:16] and those kinds of selections regardless [31:18] of what uh form the the new building [31:21] takes. Um so in terms of the uh some of [31:24] the elements in the scheme are very [31:26] similar to scheme number two in terms of [31:29] um these vertical kind of engaged [31:31] columns and some of the um these sort of [31:34] outriggers that are something a little [31:37] bit prairie style or craftsman uh in [31:41] nature. [31:46] So again the similar view towards the [31:50] river [31:52] and in each scheme we are trying to [31:53] think about providing you know some [31:55] space where you would want privacy on [31:56] the inside anyway. It creates a signage [31:59] opportunity on the exterior. [32:06] So, as we move to the south, again, just [32:09] looking at breaking up some of these [32:11] areas of glazing, slightly smaller [32:14] glazing areas, um, balancing some what [32:17] might be some additional roofing uh, [32:19] costs with maybe less glazing costs. [32:23] Um and in this scheme, one other [32:25] difference um on the rear here is that [32:27] because of the roof um massing, we've [32:30] extended the roof out and made this a [32:33] fully covered uh terrace where the [32:35] columns go all the way up to support [32:37] that roof structure. [32:41] Uh again, in this scheme, we're showing [32:43] a the same kind of riverwalk element [32:46] with the curve linear [32:49] design as in scheme two. [32:54] you know, knowing that we aren't the [32:56] landscape architects, we're the [32:58] architects, but this building has so [33:00] much integral relationship with what we [33:03] know will be an important river um [33:06] feature river future riverwalk. And so, [33:09] regardless of, you know, even the early [33:11] stages right now, we want to make sure [33:12] that the architecture of this new [33:14] facility is addressing that outdoor [33:15] space even at a conceptual level and [33:18] being informed by it. [33:22] So again, as Joe mentioned, all of the [33:24] schemes have that public art opportunity [33:27] that you know, if you're enjoying this [33:28] terrace, you've got a nice view of [33:32] that public art opportunity. [33:36] And there you can see a little better in [33:38] elevation how those kind of roof [33:40] elements [33:42] um relate but don't compete with the [33:45] village hall. [33:48] So just to kind of recap so you can see [33:50] them all in one place we thought would [33:52] be helpful. Um again I hopefully seeing [33:54] them all at once um reiterates the point [33:57] that we've made about the overall [33:59] massing the breaking up into public fire [34:05] support elements and using those towers [34:08] to anchor the corners and and mimic the [34:12] existing village hall in that way. [34:17] Sorry. [34:20] » And again, just this slightly different [34:22] riverwalk schemes as placeholders of [34:25] that future idea and how this terrace [34:27] space might start to relate to a future [34:28] riverwalk. [34:31] Okay. Any you want to stop and take some [34:34] questions on the overall schemes or go [34:36] all the way through? [34:37] » Uh, I'd say go all the way. [34:38] » All the way through. Great. [34:43] » We'll turn it over to Yes. [34:50] » All right. Well, thank you everybody and [34:52] it's a pleasure to be here and glad to [34:54] meet you and I know I've worked with a [34:55] couple of you in the past on different [34:56] projects, but as a little introduction [34:58] again, Chris Kak with Harbor [35:00] Contractors. We're a 67y old [35:02] construction management contracting [35:04] company and public safety facilities is [35:06] probably one of our primary market [35:08] segments. I've been with the company for [35:10] 23 years and I don't recall a time we [35:12] hadn't had an active public safety [35:14] project on at any one of those times. So [35:17] with our experience on building projects [35:20] and current projects and our historical [35:22] costs, we kind of work with the Williams [35:24] team to help pro provide some validation [35:26] of the costs and obviously are being [35:28] presented with some options and [35:30] decisions to show kind of the order of [35:32] magnitude impacts of those types of [35:33] decisions. So we'll kind of get right [35:37] into it. go backwards. [35:39] So to get right into it, again, we based [35:41] everything kind of off of the the scheme [35:43] one project with initial price and we've [35:45] got some details in the background of [35:46] that, but try to give some validation of [35:49] the different schemes and kind of their [35:51] impacts of how things move along and [35:53] change. Obviously, if you look at the [35:55] concepts, there are some different [35:56] things, more roof lines, more glass, and [35:58] more windows, and those kind of lead to [36:00] the [36:00] » Sure. [36:00] » I'm sorry if I could interrupt. [36:02] Absolutely. Could you tell us what when [36:04] you say scheme one use the terminology [36:07] as also that so scheme one is the [36:10] dynamic? [36:11] » Yes. [36:11] » Yes. [36:12] » Thank you. [36:13] » Yep. The scheme one is the dynamic. And [36:14] let me see if I go back a couple here. [36:16] Where's your recap? [36:19] » Yeah. The scheme one is a dynamic. [36:21] » Yeah. [36:22] » And the next one, scheme two, the [36:24] contextual presence. that would be or um [36:28] you know the a lower cost of [36:30] approximately $300,000 than the scheme [36:32] one [36:33] » You know you get to go back to scheme [36:36] three the spatial uh context that one [36:41] you know it's basically the same cost as [36:43] scheme one you know I mean it shows a [36:44] small different thing and then scheme [36:45] four is the highest cost if you go again [36:49] you get additional roof lines the extra [36:51] canopies and all that So, [36:58] so that's the the total project budget [37:00] we came up with and and we'll get to the [37:01] next slide. It shows it is total project [37:03] budget escalation, contingencies, owner [37:06] costs and all that. You know, that's one [37:08] thing that uh you'll you'll see as we go [37:10] through. And then, you know, on top of [37:11] that, we did the riverw walk allowance [37:14] of uh additional budget of $3.5 million. [37:17] you know, the main patio function of all [37:20] of the options is in the base number, [37:22] but the extension of the river walks [37:24] going east and west, and that's kind of [37:25] an area that's kind of up for design a [37:27] little bit. And then, you know, we did [37:29] have another item of renovations to the [37:31] existing building. You know, there's [37:32] some functions that are leaving this [37:34] building. You know, kind of the basement [37:35] moving area. You know, we kind of that [37:37] as a placeholder of if you're going to [37:39] do something with those spaces now or [37:41] moving on. [37:44] So what I want to talk about again this [37:46] is probably a really important item of [37:49] the total project budget. Um we do this [37:52] a lot. We go through a lot of [37:53] municipalities who are you know [37:55] obviously you're looking what other [37:57] people have done and you hear people [37:58] talk about project costs of different [38:00] projects they've done. It's those [38:02] numbers are often all over the place. [38:04] Some of them include land, some of them [38:06] include owner costs, some of them are [38:07] just the building costs. So this [38:09] represents the total project budget. you [38:12] know, going through there. I mean, the [38:13] biggest item is the construction costs [38:15] of the 223, which is about 75% of the [38:18] total budget. Um, next biggest one is [38:22] the soft cost, the owner's cost. You [38:24] know, it's going to be design fees, [38:26] furniture, a lot of costs that you guys [38:28] have to deal with whenever you're doing [38:29] a project. You know, it's kind of [38:30] all-encompassing of the complete cost. [38:33] Um, you know, we have included a [38:35] contingency at this point. You know, the [38:37] way we put these estimates together, [38:39] like I said, we got a lot of experience [38:40] doing this. We've worked with Williams [38:42] quite a bit. We know even though these [38:44] drawings are early stages, we kind of [38:46] can envision what they're going to be [38:48] when they get done completing them. You [38:49] know, we know all the details that have [38:51] to get added. We've had conversations [38:52] with their structural engineers and work [38:54] with their civil side. So, we can kind [38:56] of anticipate what those things are [38:58] going to be, but you know, it's be [39:00] foolish at this point not to have a [39:01] contingency in there because, you know, [39:02] there's going to be things that move [39:03] around. And we also included an [39:05] escalation factor in there. You know, [39:07] anticipating this would be a 2028 start. [39:10] You know, we kind of do that on a, you [39:12] know, average continual escalation over [39:14] the years. You know, we don't really [39:15] factor any current little minor price [39:17] impacts. They usually all kind of smooth [39:19] out and just kind of go over the [39:20] historical, you know, 3 4% goes kind of [39:23] per year. So, anybody have any questions [39:26] on the total project budget? [39:30] Okay. [39:32] If we go to the next one, you know, um, [39:34] one of the things we do on many of the [39:36] projects, you know, yes, we're a [39:38] builder, but we get involved very early [39:40] on in these conceptual stages. You know, [39:42] not only to help guide those or provide [39:44] some cost validation behind those design [39:47] decisions, but as with every project, [39:50] everybody's trying to find the most [39:51] economical way to build the project. So [39:53] we start looking at options with uh the [39:56] Williams team as they're going through [39:58] design for you know are there ways for [40:01] cost reductions. You know there's kind [40:03] of two major categories A and B. There's [40:06] permanent changes. You know decisions [40:08] that you'll make that you can't really [40:09] go back on you know of cutting the [40:11] building in half or taking off a floor [40:12] or something like that. You know major [40:14] decisions or major program changes of [40:17] reducing square footages. Those are [40:18] difficult to come back with. The next [40:20] one is bid alternates or future phases. [40:23] It's portions of a project that we can [40:26] establish when it gets to the point of [40:28] this thing goes out for trade contractor [40:30] bidding alternate pricing. They can be [40:32] either ads or deducts of hey at uh the [40:36] build out of this room. You know, they [40:37] will provide the actual pricing. That [40:39] decision can be made when you get the [40:40] real final numbers at bid time. So [40:42] that's a good strategy to, you know, [40:45] kind of maximize your budget and also [40:47] not, you know, get in a situation where [40:50] you eliminate something and go, "Oh man, [40:52] we got really good numbers. The bids [40:53] came in really well." You know, in 2008 [40:55] the economy was a perfect timing for [40:57] bidding. And we wish we wouldn't have [40:59] made that change. It gives you those [41:00] options to have those things in there [41:02] and choose as you go. So, you know, [41:04] initial options, just talking, you know, [41:06] and work with the Williams teams, we [41:08] came up about $ three and a half million [41:09] dollars of just initial options. That's [41:11] kind of a first round of that. And it's [41:12] kind of a continued effort during the [41:15] design and pre-construction. You know, [41:17] the way we work with the Williams teams [41:19] is as they're coming up with an option [41:21] or something, they won't completely [41:23] spend the time and effort fully to [41:24] design it out. They'll they'll consult [41:26] with us. We'll work with them and guide [41:28] them along the way of, hey, this is a [41:30] more economical way to do it or, you [41:32] know, here's a couple options you can [41:33] consider as you're going through the [41:35] design. But you know some of the options [41:37] we've investigated are you know [41:39] reduction in program spaces you know [41:41] those are things obviously you spent a [41:43] lot of time working on a program but you [41:44] know sometimes choices have to be made [41:46] and that's something to look at and you [41:47] know evaluate it and look at those as [41:49] you go through. You know the other thing [41:52] is build the shell and core with future [41:54] buildouts. You know, it's quite common [41:55] thing we do with a lot of clients where, [41:58] you know, hey, you design a portion of [42:00] the building, you build the entire shell [42:01] and cord, everything's there. You just [42:03] don't put the finishes in and it's [42:04] either funded as a separate project or [42:06] bid as an alternate or something that [42:08] could be a future phase of the project. [42:10] You know, the west parking lot, you [42:12] know, kind of the same thing we had in [42:13] the budget, reconstructing the west [42:15] parking lot, you know, and new paving [42:17] and getting that, you know, uh, cleaned [42:19] up and a little bit, you know, that [42:20] could be a separate project later down [42:22] the road. Um, you know, West Garage [42:24] Drive, you know, we've got the [42:25] drive-thru of the garage, you know, [42:26] running through, you know, from east to [42:28] west with the two garage doors. Same [42:30] thing. That's something it could be a [42:31] bid alternate or, you know, done as a [42:33] future phase on the project. Um, you [42:36] know, reduction amount of windows, you [42:38] know, that's something, you know, as you [42:39] look at the different concepts, you [42:41] know, that's something that could be [42:41] applied to any one of these concepts. [42:43] You know, obviously that's one of the [42:44] more expensive items in any project is [42:46] the glass is more expensive than the [42:48] masonry. So, it's something to look at. [42:50] um alternative exterior materials. You [42:53] know, we've already worked with the [42:54] Williams team on the actual structural [42:56] design of the building to kind of uh [42:58] bring some costs a little bit more in [42:59] line with that. But alternate materials, [43:01] you know, that's something, you know, [43:04] not necessarily could be a wholesale [43:06] change in materials or it could be [43:07] selective materials. And Whim's very [43:09] good at mixing different materials and [43:11] making it flow very well with their [43:12] designs, but that's something we look at [43:14] as options as we go through the project. [43:17] Um, you know, there's other things of [43:18] elimination of the ornamental stair, you [43:20] know, going to something more [43:21] traditional with than the kind of [43:23] grander lobby that's in there. And then, [43:25] you know, some open office space [43:27] layouts, you know, I mean, that's [43:29] something to look at a little more of a [43:30] different concept where you have more of [43:31] a cubicle type arrangement than offices. [43:34] Obviously, given the nature of this [43:35] facility, some of those things are need [43:37] to be separate, you know, separate [43:39] private offices, but it's an option to [43:41] look at. So pretty much it's it's to [43:44] provide kind of a guideline, a path of [43:47] moving forward and continually looking [43:50] at options throughout the process of [43:52] what's the most economical way to meet [43:54] your guys' vision. So that's kind of [43:56] where we provide that support and help [43:58] with that along the way. So any [44:01] questions on that cost reduction process [44:03] or thoughts? [44:07] » We'll go through uh this. Yeah, once you [44:10] guys are done, we'll we'll go through [44:12] this in more detail. [44:14] » Absolutely. I think that's the last [44:15] slide. [44:19] » We got one. [44:23] » Thank you, Chris. So, um just to wrap up [44:25] and then um open everything up for [44:27] questions and for feedback. um next [44:29] steps. We certainly want to hear from [44:31] all of you um what you um what you're [44:34] thinking, what questions you have, what [44:35] preferences you have. Anything that you [44:37] want to say, don't ever show us again. [44:39] It's all um it's all on the table and [44:42] the goal is to show you a number of [44:44] options um so that we can work together [44:47] to get um to the solution that's in the [44:49] best interest of the community. So um as [44:52] we mentioned, we we'll have this [44:53] discussion tonight, answer questions you [44:55] have. We want to um if we are not if you [45:00] all coales around a particular exterior [45:02] idea that's wonderful. That is not our [45:05] expectation or our goal for this [45:07] evening. It's merely to receive [45:09] feedback. If you wish as a um village [45:12] board to sort of narrow the funnel um [45:14] for preservation [45:16] certainly um is is something you can [45:19] choose to do. Um but um our next steps [45:22] are to present this um to that group and [45:24] then to start the engagement process to [45:27] um inform the community um not only [45:30] about the design for this project and [45:32] the options for this project um but to [45:34] work with staff and work with all of you [45:36] around the underlying need. Why are we [45:39] doing this? Why is this necessary? Why [45:41] are we doing it now? So, um that is all [45:44] coming up in um in the coming weeks and [45:46] months, but um it's a lot of [45:49] information. Um we're doing a public [45:52] safety facility with fire and a lot of [45:54] information sort of through a proverbial [45:56] fire hose. So, at this point, love to [45:58] turn it over to you for questions and [46:00] comments. [46:00] » Thank you. Um in order for us to you [46:04] know, there's a lot to digest here [46:06] obviously. uh and in order I want to [46:09] organize how we proceed with our [46:11] discussion. I have a suggestion but I [46:14] I'm open to to uh other other [46:17] considerations. I would suggest we go [46:20] through the visuals first one at a time. [46:25] Maybe we say what we like and don't like [46:27] about each one and uh then we get into [46:30] the cost reduction um [46:34] uh discussion because the cost reduction [46:36] applies equally more or less to all the [46:38] different options. Right. Yeah. Does [46:41] that work for the trustees? [46:44] » So I'd like to start with the site plan [46:46] because I have one comment on the site [46:48] plan. [46:51] » Thank you. [46:53] I'll just stay right here. [46:55] » And and this relates to the cost savings [46:57] stuff, too. My [47:00] comment when I f saw this over the [47:02] weekend was, do we really need that west [47:05] drive at all? Uh, and so I asked manager [47:08] Francis that and I believe the answer [47:10] was not really. [47:12] » No. Um, initially when we were talking [47:14] about that drive, it was when we were [47:16] conceptually thinking about having the [47:19] the fire apparatus kind of swinging [47:22] around, but that changed and evolved [47:24] over time. So that additional access [47:27] point is is not needed and actually that [47:29] will probably help free up space for a [47:32] trash enclosure [47:34] » And it could be repurp or could be used [47:37] in the future as more public space as [47:39] well. [47:40] » Sure. It's valuable riverfront space to [47:42] have unnecessary drive [47:45] doesn't seem necessary. [47:48] » But sort of the site plan question leads [47:50] into another one of my [47:53] questions about all the schemes and that [47:55] is um for the mechanicals for the [47:58] buildings. Um you know a lot of places [48:01] put their air conditioner condensers on [48:03] the roof. I just wasn't clear on where [48:08] the intended place for that was and [48:11] whether they would be visible or somehow [48:13] enclosed. [48:16] » Sure. I I can I can answer that [48:17] question. And um we're we haven't [48:19] determined the um the exact mechanical [48:22] systems for the project, but um it's [48:25] very likely that we'd have something for [48:27] cooling and ventilation on the roof um [48:30] which would be fully screened. um that [48:32] lower roof over the apparatus bays is an [48:35] ideal place for that. Um I have not [48:37] studied your zoning ordinance in great [48:39] detail, but I'm relatively certain that [48:41] it would require screening of those [48:43] units. So um that would handle a lot of [48:45] the ventilation and cooling heating. Um [48:48] we can we can look at options indoors. [48:51] Um we do like to do these facilities um [48:54] with hot water heat um and then air [48:56] handling units which could be in the [48:58] basement mechanical rooms. But um we do [49:00] anticipate some degree of equipment on [49:02] the roof and for that equipment to be [49:04] screened. [49:06] » Are there um any of the particular [49:08] designs that would be um more amendable [49:12] to that? I mean it seems like some of [49:15] them are pretty [49:17] um flat and low. [49:19] » Yeah, I think it's something we have to [49:22] study to be very honest. In my mind, um [49:25] the the more contemporary or the the low [49:28] slope or flat roof concepts um that have [49:31] more horizontal elements lend themselves [49:34] to um those mechanical enclosures a [49:37] little better because we could use more [49:39] horizontal elements to help with that [49:42] screening. But um if the desire of um [49:46] the village is to explore something that [49:48] has those more traditional forms, we can [49:50] find ways to to screen in in ways that [49:53] that make sense. We we work on projects [49:55] all the time where it looks like a [49:58] sloped roof building from the street and [50:01] um somewhere in the center invisible to [50:03] anybody except someone who has a drone [50:05] or somebody flying over. Um you've got [50:07] some accounts and stuff there. [50:09] » Wonderful. Thank you. [50:10] » So I think we can work that up no matter [50:11] what. Okay. Any other questions or [50:14] comments on the site plan? [50:17] Is there a general agreement to [50:19] eliminate the West Drive? [50:21] » Yes. [50:23] » Great. Um, so let's move on to the uh [50:28] dynamic [50:30] response. Was that was Yeah. So, and [50:33] before we get into that detail, I just [50:35] want to answer one question that I know [50:37] we we all have had or I've heard is uh [50:41] we're not at the stage where we could [50:43] say what we're doing to make this an [50:45] environmentally friendly building, but [50:47] we will be and it will be an [50:50] environmentally friendly building to the [50:52] extent possible. uh meaning bird [50:54] friendly windows uh meaning uh efficient [50:58] uh utilities all the stuff that goes [51:01] into making a building sustainable. So [51:04] that will be a priority. It's just we're [51:07] not there yet. [51:09] So dynamic response, [51:12] what do you like or dislike about it? [51:16] » Anybody? [51:18] Aine? [51:19] » I actually like this one a lot. Um, I [51:23] really like the fact that it has, um, [51:27] some angularity to it. Um, it's [51:30] contemporary. I see, you know, in the [51:33] section that's behind the, um, Riverside [51:36] logo that there's some, uh, you know, [51:39] horizontal banding, which suggests to me [51:41] that warm wood that you sometimes see in [51:44] in contemporary glass like you were [51:46] talking about. um kind of softening or [51:50] harmonizing with materials [51:54] um you know something that is of a [51:56] different time period with its [51:58] surrounding architecture. So, um, you [52:01] know, this, uh, is very intriguing to me [52:04] and, um, you know, I'm always I always [52:08] kind of wonder a little bit about like [52:10] the pitch of the roof or is it flat? [52:12] Like, I can't exactly tell what's going [52:14] on with it, um, and how that works with [52:17] drainage and things like that, but I [52:19] really think it's a um, very energetic [52:24] and dynamic building. So, congrats on [52:26] the initial concept. Um, I'm not sure [52:30] about the Riverwalk. Um, you know, [52:33] having that be straight [52:37] as straight as it is. I mean, that's [52:39] very very angular. Um, but in general, I [52:43] think uh there's a lot of positive [52:46] things to be said about this one. [52:49] » I completely agree with you. [52:52] » All right. So, there you go. Um, when I [52:56] look at all four of them, [52:58] the this first one is the one that I [53:00] actually had an emotional response to. I [53:04] actually felt like architecture is such [53:06] a big deal in Riverside and we have so [53:09] many different architectural styles [53:11] incorporated [53:13] and [53:15] this to me is a visually interesting [53:18] building that doesn't try and blend in. [53:20] It doesn't it's in it in itself [53:24] It is interesting. [53:26] I also feel like um I worked on a [53:28] college campus for over a decade and [53:32] obviously there were always we were [53:33] always building and every time we tried [53:36] to build something that looked a lot [53:38] like something else, it was never [53:40] received well because it never looked [53:43] enough like it and it never it was [53:46] trying to be something else. And one of [53:50] the things I really like about this is [53:52] it's not trying to be like the building [53:54] that's directly next to it, which is [53:57] something that is awesome in Riverside [53:58] that you can have two houses. You can [54:00] have a Victorian right next to a [54:02] Franklidd Wright, right next to a [54:04] bungalow. And so I really liked [54:09] the way that the lines kind of called to [54:12] the building next to it and were [54:14] cohesive with it, but it was its own [54:17] building. it was its own design. Um, [54:21] that was really, like I said, this is [54:23] the only one I actually had a response [54:25] to. The rest of them I was like, well, [54:26] these are fine. Um, the other thing I [54:29] love about this one is I love all the [54:31] glass and I feel like if you are inside [54:33] this building, you're going to get a ton [54:36] of natural light and feel much more like [54:38] you're in nature. Um, way more so than, [54:42] you know, it was we were talking with [54:44] the last scheme where the openings were [54:47] smaller and stuff. I really felt like [54:48] this would feel much more connected to [54:51] the river and the forest that's around [54:53] it more so than some of the other [54:56] designs. [55:00] » Any other comments on this? [55:03] » I have a question. So, it looks like the [55:05] the the roof on scheme one it's pitched. [55:09] Is it does it go like this or is it [55:12] straight across the top? [55:13] » I mean it it will have a pitch to drink [55:15] water. [55:16] » There are number of way that we handle [55:18] that. Um and and even with the p pitched [55:20] roof beyond that fascia element that is [55:24] the large horizontal band, you know, [55:26] would stay flat. [55:28] » So um it may be a little bit of optical [55:31] illusion with the way that it bends [55:32] around the turret. It does kind of look [55:35] as though it's peeking up, but the [55:37] intent is that it be a really strong [55:39] horizontal band of facial all the way [55:41] around the building. And that movement [55:43] is more in plan view. [55:50] Uh, I'm happy to provide my my thoughts. [55:54] Um, initially this wasn't my favorite, [55:57] although I liked it. I still like it. [56:01] Uh, Trusty Marsha and Trusty Cost may [56:03] convince me that it's the favorite. But [56:07] what I do like about it a lot is all the [56:10] glass on the front side. Mhm. [56:12] » I mean, I think that is [56:15] it's symbolic of transparency. Uh, it [56:19] connects it to the exterior. [56:22] Um, I I really like that part of it. I [56:26] like the horizontal lines. I like the uh [56:30] small thing, but I really like the sign [56:32] freeze above the garage doors, the [56:35] opportunity to have that branding there, [56:38] that Riverside Public Safety Center. Um, [56:41] I realize you could do that in other [56:43] ways on other elevations, but on this [56:45] one it's got a nice perfect It's like [56:47] it's designed to have that. It would [56:49] look empty without the sign on it. [56:53] Um what I am hesitant about with it is [56:57] the blank wall that we're looking at [56:59] right now where the uh uh you know on [57:02] the left side of the the the bays and [57:06] then on the back side. [57:10] Um yes I like that. Okay. Initially I [57:14] thought there was too much blank walls [57:16] but maybe maybe not. Maybe not. [57:19] » Sorry. [57:20] um or that from that perspective it made [57:22] me feel like there were too many blank [57:24] walls. [57:25] Um but [57:30] those were my thoughts. Does anyone else [57:33] want to weigh in? [57:35] We'll go on to the Go ahead. [57:39] » Um I like all of them. I think we all do [57:42] great work on it and I like how the [57:44] facade is broken up. For me, this design [57:47] doesn't break it up enough. And I know [57:49] that's intentional to take that straight [57:51] line all the way across the main part of [57:52] the building. [57:55] Just my personal preference. I don't [57:56] care for that. [58:02] » Uh I would just like to say your [58:04] emphasis on the windows in the back just [58:06] because that's the that's overlooking [58:09] the river which is our most important. [58:13] say that one of the comments on this [58:15] scheme in particular that [58:16] » Can you go to the podium please? [58:18] » Sorry just one of the comments on this [58:21] scheme from the group about the glass [58:23] from the riverside was a concern for [58:25] vandalism. They do get a there are as we [58:28] were having this discussion walking [58:29] through broken windows facing the river. [58:32] And so from a practical standpoint, we [58:35] wanted to again show a variety of [58:36] options um if more glazing for views and [58:40] and that's why in this scheme we did [58:42] really try to focus in on where are [58:43] people um occupying the space for long [58:46] periods of time and having views from [58:48] the living spaces, the apparatus bay at [58:50] the lower level that's more prone to [58:52] damage from both inside and out. Um and [58:55] then focusing the glass more on the [58:58] community space where it will have the [59:00] views. But um as mentioned uh any of [59:04] these comments about where you do or [59:06] don't want more glass, you know, we can [59:08] translate those comments easily to any [59:11] of the schemes. [59:12] » Are they designed as all windows or is [59:14] it just a sort of a strip of windows? [59:17] » I mean typically when we have a large [59:20] expansive glass like this, it will [59:21] either be a curtain wall system or a [59:23] storefront system. So it's not all [59:25] operable if that's what So we would [59:27] design certain amount of actual [59:29] ventilation open windows that can open [59:32] within that system, but it would not all [59:34] be operable if that's [59:36] » You mean open and close? [59:38] » Yes. Sorry. [59:39] » No, I wasn't really thinking about that. [59:40] I just wanted to know how big the [59:43] windows are. It looks like there's only [59:44] a strip of windows, not the whole space, [59:47] the whole area of the squares. [59:48] » I see. I think you're seeing the ceiling [59:51] going through and so that looks solid. [59:53] Yes. Yeah, I see what you're saying now. [59:56] » So, uh that is ceiling beyond. [59:59] » I see it. And then actually in this [1:00:02] space, if you're in the this is the [1:00:04] dining room, um there are glass there [1:00:07] are windows um looking over the [1:00:10] apparatus bay on the other side. So, and [1:00:13] there's also windows lower looking from [1:00:14] that space into the apparatus bay. So, I [1:00:17] think you're actually seeing I'm going [1:00:19] to go the other way. [1:00:22] Nope, wrong way. [1:00:25] These windows showing through [1:00:28] » From the back view is what is kind of [1:00:30] throwing off that view of the glass. [1:00:32] Thank you for [1:00:35] pointing that out. [1:00:39] » Also, I just want to mention where you [1:00:41] see the most windows are the public [1:00:44] spaces because that was staff's focus as [1:00:47] we met with Williams. [1:00:49] Yeah, it doesn't make any sense to have [1:00:51] windows. I don't I mean, it'd be cool to [1:00:55] have textual design, textual [1:00:58] architecture design in the bottom part [1:01:00] where the bay is, but it doesn't make [1:01:03] sense to have windows there because [1:01:04] that's where all the trucks are and [1:01:07] stuff like that. You know, like you [1:01:08] said, they can get damaged that that's [1:01:11] not a great spot for I mean, as much as [1:01:13] I would love it, there's not a lot to [1:01:15] see and there's not a lot of people [1:01:16] looking even from inside. There aren't [1:01:19] people looking outside. [1:01:21] » Yeah, it it may be that the selection of [1:01:23] exterior materials will [1:01:26] » Impact this view a lot. [1:01:28] » Yeah. [1:01:31] » As well as the landscape and ramp [1:01:32] design, you know, other things that we [1:01:35] use to fill it to fill in that lower [1:01:37] space. Um there's opportunities both for [1:01:40] landscaping and material change to make [1:01:42] sure that's not a large blank facade. [1:01:46] Any [1:01:48] other comments on this one? [1:01:52] » So, let's uh talk about number two, [1:01:54] contextual. [1:01:59] » Sorry, [1:02:01] they're really small on my screen. [1:02:04] So, I'm seeing a lot of the same shapes [1:02:06] roughly. [1:02:07] » There you go. [1:02:08] » That's where we go. [1:02:19] There we go. Contextual [1:02:24] » Justice. [1:02:27] » This is my favorite one. Again, I like [1:02:30] how it's broken up. I like this there's [1:02:32] a lot of vertical lines to it. And of [1:02:36] course, the windows. [1:02:42] I like this one less because I liked the [1:02:45] horizontality of the other one and I [1:02:47] feel like the columns here are [1:02:49] distracting in a way um that they're [1:02:53] just [1:02:54] » They're kind of like [1:02:57] added [1:02:59] just so we could have columns and I [1:03:01] don't it doesn't speak to the it doesn't [1:03:05] really speak to function for me. So, [1:03:10] » I have a question about the the entry, [1:03:13] the main entry. Is it a triangle in [1:03:17] between the two buildings? [1:03:19] Is it smaller? [1:03:21] What is the shape of the lobby? [1:03:25] » Where the truck is. Are you talking [1:03:26] about? Yeah. [1:03:26] » Oh, okay. [1:03:29] » So, just as a reminder, I'll opine and [1:03:32] then Williams can fill in the gaps. So, [1:03:34] we're going to be taking down where [1:03:37] basically the fire trucks are, right? [1:03:40] Because that was an old addition. Um, [1:03:42] all the fire equipment and then you have [1:03:45] offices currently on the outside of [1:03:48] that. So, all of that would be removed. [1:03:50] So, what you're seeing in creating that [1:03:52] connection are is the connection to the [1:03:56] historic building which occupies where [1:04:00] uh our front desk is. Um it also has uh [1:04:05] different areas as it relates to police [1:04:08] uh other like copier equipment, those [1:04:10] types of things. And so it's kind of [1:04:12] mirroring the existing building, [1:04:14] creating that lobby connection to then [1:04:17] the the new building. So it would be [1:04:20] somewhat triangular, but it it'll be [1:04:22] open as it's kind of illustrated there. [1:04:25] Does that make sense? Okay. [1:04:37] What I liked about this one was the the [1:04:41] roof line, the cornice line. [1:04:44] Um, [1:04:48] you know, [1:04:50] puts a definitive [1:04:52] end on the height of the building. Um, [1:04:56] which probably, you know, gives it a [1:04:58] little bit better relationship to the to [1:05:01] the town hall building. [1:05:04] Um, [1:05:07] the uh turrets or the columns, if you'll [1:05:10] go back to that, [1:05:14] that corner piece on the left has [1:05:17] windows. It has it has a cap. It's like [1:05:19] a traditional Roman column or whatever. [1:05:22] I think it'd be an ionic column. [1:05:26] Um, [1:05:28] or Doric. [1:05:29] » Doric is the one with the swirls at the [1:05:31] top. [1:05:31] » Ionic. Ionic has the it has the curls. [1:05:34] Corinthian has the [1:05:36] » Leaves. Right. [1:05:38] » So, it's Doric. Ionic. [1:05:40] » Corinthian. [1:05:42] » Doric. The simplest. [1:05:44] » Please tell me you got that on tape. [1:05:46] Please tell me some of you that was all [1:05:53] » My work is done. [1:05:56] » Um [1:05:59] I I like the backside of this one. [1:06:02] Um but quite honestly equally I I like [1:06:05] that it's cost less. [1:06:09] Um, [1:06:11] I mean that's not a deal. That's, you [1:06:13] know, it's doesn't cost enough less [1:06:16] to where if I, you know, didn't like it, [1:06:19] I'd do it. But, um, but that's a plus in [1:06:23] its column. [1:06:28] » I I mean, I I I like this one. I feel [1:06:31] like it's But I feel like it's fine. [1:06:34] » It's not as exciting. [1:06:36] » That's how I feel. It's fine. [1:06:38] » It's not as risky, not as exciting. [1:06:41] » Yeah. And I feel like we're such an [1:06:44] architectural village, right? It's [1:06:47] architecture is so important to so many [1:06:48] people in this village that having [1:06:51] something that's just kind of [1:06:52] » Fine or like, you know, [1:06:56] I'm I'm not I don't want to offend [1:06:58] anybody. I'm really sorry, but like it [1:07:01] looks like a lovely strip mall or like a [1:07:03] I mean like a really lovely one. Not [1:07:05] like your gross corn, you know, but like [1:07:07] it looks it's like a lovely strip mall [1:07:10] kind of thing and I don't feel like it [1:07:12] has the like wow. [1:07:15] » Yeah. [1:07:17] Okay. [1:07:18] » Any other comments on this one? [1:07:22] » I agree with Trustee Cos. [1:07:25] We are never like this. This is awesome. [1:07:30] Well, let's uh move on to number three. [1:07:32] Spatial framing [1:07:38] » To me. This one's similar to the first [1:07:40] one. Not the same, but has a lot of [1:07:42] similarities. [1:07:46] » The lines are a little bit more broken [1:07:47] up. [1:07:54] » Any other comments on this one or [1:07:58] You said that it was um a craftsman [1:08:02] style. [1:08:03] » That was the windows [1:08:05] » Two [1:08:07] more. [1:08:09] » I'm sorry. Two and four. [1:08:10] » Oh, okay. [1:08:11] » Two and four. [1:08:14] » This is a little more modern in the [1:08:16] same. [1:08:16] » Can you go to the microphone, please? [1:08:18] » I can't pick it up for our audio if it's [1:08:20] not on the mic. I apologize. I [1:08:22] apologize. [1:08:23] Um, anyone can answer these questions [1:08:25] for our team, but um, yeah, this one has [1:08:27] a little bit more of a modern references [1:08:30] in the framing lines, whereas op scheme [1:08:34] um, two and four did have some what we [1:08:36] would consider more traditional [1:08:38] Craftsman detailing with um, the deep [1:08:41] overhangs and the um, the detailing of [1:08:45] kind of the outriggers supporting that [1:08:46] roof line. [1:08:49] But, you know, that can be accentuated [1:08:51] or or not in terms of the detailing of [1:08:55] the building. So, [1:08:57] this one seems just too modern. [1:09:01] I don't know if it would look [1:09:04] as nice next to the township building. [1:09:09] Looks very modern to me. [1:09:15] » A little too busy and distracting. [1:09:17] » Yeah. [1:09:21] I wasn't too I wasn't didn't didn't [1:09:25] really like the uh if you'll go to that [1:09:27] the backside perspective. [1:09:30] » Yeah. Well, no, not that one. What the [1:09:33] the swinging bridge side? [1:09:38] » This one. [1:09:38] » That's good. That's good. [1:09:42] the the framing of the columns on the [1:09:45] edges at the corners and the framing of [1:09:47] the window bays [1:09:49] seemed to me to be not natural. [1:09:54] Something like that. Not organic. [1:09:58] » Interesting. [1:09:59] » Um, [1:10:01] so [1:10:04] speak for myself, either one or two I'd [1:10:08] prefer over this one. [1:10:11] Does anybody feel any differently from [1:10:12] that? [1:10:16] » Good. We can move on to number four. [1:10:26] » Traditional anchoring. This is the most [1:10:28] expensive one, right? [1:10:32] » And that's I'm guessing because of the [1:10:34] roof almost entirely, if not entirely, [1:10:38] » Which I did like the roof. this one. [1:10:45] » Others comments. [1:10:47] » Uh, this is my least favorite one. Uh, [1:10:52] again, I'm sorry, Alex, but I don't love [1:10:54] the roof. Um, I also don't love that the [1:10:57] windows are are smaller and choppier. I [1:11:00] like seeing the expanse of windows. [1:11:03] I think it's [1:11:06] Yeah, I I I just think it's more [1:11:08] interesting. [1:11:09] with the expansive windows. And I I [1:11:13] don't know. [1:11:14] Yeah. Again, I worry what I worry about [1:11:16] with this one is that it's gonna look [1:11:19] like that. We tried really hard to make [1:11:22] it sort of look like the building that's [1:11:23] next to it, but it doesn't really look [1:11:26] like the building that's next to it. And [1:11:27] that people are going to be like, "We [1:11:29] tried, but we didn't." And it's going to [1:11:31] look not right. [1:11:35] Not that you wouldn't do a fantastic job [1:11:37] on it, but [1:11:40] » But you're you're absolutely correct, [1:11:42] trusty cause, and you've commented [1:11:44] before. I think historic preservation [1:11:48] preservationists would say the same [1:11:50] thing. Don't try to look just like the [1:11:52] other building. [1:11:55] Be respectful of the other building, but [1:11:58] don't try to copy it. [1:12:01] » Exactly. [1:12:03] That's a fine line. I know. But [1:12:05] » No, no, no. You're right. Because I can [1:12:07] understand if if you did have the same [1:12:08] shingles on both buildings, then you are [1:12:10] trying to mimic it. After two different [1:12:12] ones, it still wouldn't compliment it [1:12:14] quite well. At number one, it does have [1:12:17] a very nice complimentary horizontal [1:12:19] line. [1:12:21] It does pay some homage to it as well. [1:12:23] So, um, while I was impressed with this [1:12:26] one, it's not my favorite. I would think [1:12:28] number one, probably the best one. [1:12:33] So, given what I'm hearing, does this [1:12:35] rise above one or two for anybody? [1:12:40] » Good. But we're down to two. [1:12:43] Um, and I would suggest [1:12:47] that uh we send those two to to our [1:12:51] preservation commission [1:12:53] saying here's what [1:12:56] we like and ask for their feedback. [1:13:00] Emily, can you put the four up again? [1:13:02] » Yeah. [1:13:03] » Thank you. [1:13:05] » Yeah, this is four. [1:13:06] » No, four. [1:13:08] » All four. Sorry. [1:13:10] » Page 175. [1:13:22] » I think that's a good suggestion. [1:13:24] So that's the plan based on the board's [1:13:27] discussion is the next step is the April [1:13:30] 9th preservation meeting that we would [1:13:33] solicit additional feedback [1:13:39] » And want to send one and two to them. Is [1:13:41] that what we're doing? [1:13:42] » Mhm. [1:13:42] » What's that? [1:13:43] » We're going to send schemes one and two. [1:13:45] » Yes. [1:13:45] » Okay. [1:13:46] Well, I mean they can look at all four [1:13:48] of them because this is on our website, [1:13:50] but [1:13:51] » Yeah, [1:13:51] » The direction would be the village board [1:13:54] is asking for their response to one or [1:13:57] two. If [1:13:59] they like if they have comments about [1:14:01] three or four, I wouldn't stop them from [1:14:03] commenting, but [1:14:05] » You know, [1:14:06] » Free speech and all. [1:14:07] » Yeah. [1:14:10] So, let's uh let's next go to the cost [1:14:14] reduction page. [1:14:16] Wait, could we just say one more thing [1:14:18] about scheme one? [1:14:20] » Yeah. [1:14:20] » So, I think your feedback was that the [1:14:23] the side the east facing side was too [1:14:28] plain. [1:14:29] » Well, it's more that [1:14:32] that blank column that faces the street. [1:14:36] » Yeah. [1:14:36] » Yeah. So, it's the doors just that one [1:14:39] column. [1:14:41] And maybe it maybe it makes sense and [1:14:42] maybe again it's with the right [1:14:44] materials it's fine. [1:14:47] » Um [1:14:48] » Or open to suggestions on that one. [1:14:51] » Yeah. [1:14:51] » Or [1:14:52] » Could you just maybe do something to it? [1:14:57] » It's a stair. [1:14:59] » So [1:14:59] » Stairway. Yeah. [1:15:00] » Which you I mean like Kristen said you [1:15:02] could do architectural elements. You you [1:15:05] know there's you could do I was kind of [1:15:07] thinking in the blank spaces they [1:15:08] wouldn't necess In all of these games, [1:15:11] they wouldn't necessarily be blank. They [1:15:13] would they're just blank slates. I don't [1:15:16] know. Maybe I'm [1:15:17] » Be a contrasting panel of some kind. [1:15:20] Right. [1:15:20] » Well, and I also just wanted to remind [1:15:22] everybody as well like some of the [1:15:24] elements could be interchange. So, one [1:15:26] thing that came to my mind there was [1:15:27] signage potentially like we showed [1:15:29] there's that area adjacent to the entry [1:15:31] which kind of makes sense for a good [1:15:33] signage location, but there's all like [1:15:35] that could be an opportunity for for [1:15:37] signage. Um, but absolutely like there's [1:15:40] still opportunity to articulate it with [1:15:41] windows. I recall in this scheme, I [1:15:43] think the way that that stair gets its [1:15:45] light is that we had like a narrow slit [1:15:48] window on the side that's not really [1:15:50] visible, but as some of the other [1:15:52] examples showed, that's a great [1:15:53] opportunity to do like a linear slit [1:15:55] window that would let light into the [1:15:57] stairs. So, yeah, there's definitely [1:15:59] ways that that could be further [1:16:00] developed. [1:16:01] » Cool. [1:16:05] Okay. [1:16:06] » Anything else on the elevations? [1:16:09] » Let's uh go to that cost reduction page. [1:16:21] » Go Emily. Go. Go Emily. Go. You can do [1:16:24] it. [1:16:28] » I'm glad she was doing that. I would be [1:16:30] panicking. [1:16:32] would be like I can't find. [1:16:33] » We also have broken out slides for the [1:16:36] cost estimates too that kind of depict [1:16:38] more if you need more visual. [1:16:41] » So there there was another page though [1:16:43] that had the list [1:16:45] of that. [1:16:47] » Yeah. [1:16:47] » Yeah. [1:16:49] » So let's go through that. Uh reduction [1:16:53] in program spaces that just means making [1:16:57] the building smaller, right? [1:17:00] I don't think we want to do that. [1:17:02] » No. [1:17:02] » No. [1:17:03] » I mean, yeah. [1:17:05] Uh, build shell and core for future. [1:17:09] Uh, [1:17:10] » No. [1:17:11] » That just means spending money later [1:17:13] than rather than [1:17:14] » More expensive. [1:17:15] » And if we're going to referendum, [1:17:18] you know, I feel like we should be [1:17:21] honest and say this is what it costs and [1:17:23] » Yeah, [1:17:23] » Just how much money we need. [1:17:27] Um, we talked about the west driveway [1:17:31] and I think we agreed that we would [1:17:33] eliminate that. [1:17:37] » Uh, we talked a lot about windows and if [1:17:40] anything we wanted more windows [1:17:43] so that one's out. And then yeah, [1:17:46] exterior materials that's for a future [1:17:48] discussion. Correct. We can decide what [1:17:51] you at some point we'll see what the [1:17:53] different materials cost and what the [1:17:55] savings are [1:17:56] » Uh in that [1:17:58] » The elimination of ornamental stair I'm [1:18:01] guessing trustees don't have an opinion [1:18:03] until you see the difference between [1:18:06] » The ornamental and non-orthnamental [1:18:08] right [1:18:09] » And how much we save or don't save [1:18:11] » So that is that the difference more or [1:18:13] less [1:18:13] » This more of an open stair I can let [1:18:17] » Yeah. So, um, ornamental and open stairs [1:18:21] we kind of use interchangeably. So, [1:18:23] these are some more contemporary [1:18:24] examples, especially if you're, um, [1:18:27] tending in the direction of our schemes [1:18:29] one or two. Um, this kind of expression [1:18:32] where the stairs and railings are a [1:18:35] little little bit more contemporary, [1:18:37] open to the rest of the space. Um [1:18:39] whereas if you um um if we're looking at [1:18:42] a clo an enclosed stair or what we would [1:18:45] normally consider an egress stair, yes, [1:18:48] we can do some glass. Um so there there [1:18:51] is um a measure of transparency, but um [1:18:54] just not as nice, you know, um more of [1:18:56] what we would think of um as an enclosed [1:18:59] exit stair like you have right at the [1:19:01] front um of the building here. So there [1:19:04] is obviously a cost difference um [1:19:07] between those two. Um but um it it's one [1:19:11] way among many to um save a few dollars [1:19:14] if you're so inclined. [1:19:17] » I can only speak for myself. I'm not so [1:19:19] inclined. [1:19:20] » Yeah, I'm not either. [1:19:23] » Yeah, those that first two pictures is [1:19:26] beautiful. That's you know that's our [1:19:28] public space, [1:19:29] » Right? If [1:19:30] » You'll go back to the previous one. [1:19:32] Yeah. [1:19:34] » Yeah. [1:19:41] » No, the other stair one. [1:19:44] » Oh, [1:19:45] » That's the enclosed. [1:19:47] » The other stair. [1:19:48] » Pretty one. [1:19:50] » Pretty one. [1:19:51] » Yeah. No, that's [1:19:52] » That's nice. [1:19:53] » That one on the left. That's what I want [1:19:54] our [1:19:56] primary village space to look like. [1:19:58] » Yeah. [1:20:00] Gate uh the Gateley Park Fieldhouse in [1:20:03] um on the far south side of Chicago if [1:20:05] anybody's interested one of our [1:20:07] projects. [1:20:09] » Well done. [1:20:10] » Yes. [1:20:11] » What is in the space underneath the uh [1:20:13] staircase? [1:20:15] » Great great question. Um so um whenever [1:20:19] we have a stair um where you have open [1:20:22] space underneath um we can't essentially [1:20:25] we can't let somebody underneath it [1:20:27] until the head room is at least 6'8. So [1:20:30] we need a way to block off those lower [1:20:33] areas [1:20:34] » Um so we're not bumping our heads up [1:20:36] against something. And in this [1:20:37] particular project, they just decided to [1:20:40] enclose that with a little bit of a um a [1:20:42] low wall that people could sit on as [1:20:44] they're in the lobby. [1:20:46] Depending on how we would articulate the [1:20:48] stair, um we may not end up having that [1:20:50] condition at all where we'd have to [1:20:52] close close that off. [1:20:56] » We just had a moment. I just saw a um an [1:20:59] open staircase with an enclosure like [1:21:01] that that had seating on the outside, [1:21:03] but it had a lyken garden. on the inside [1:21:07] of it which is like extremely [1:21:09] lowmaintenance and it was installed in [1:21:11] this really artistic pattern and I can [1:21:14] show you photos and it was cool and that [1:21:17] would be a really neat um [1:21:20] » Absolutely [1:21:21] » I feel like that doesn't fall into the [1:21:22] cost savings you know but you know you [1:21:26] and I yeah I think it's right there [1:21:29] » Be an LC project [1:21:30] » Once in a while [1:21:32] » Love it sustainability [1:21:34] » There y So there was one more item on [1:21:37] that list of co potential cost [1:21:39] reductions I think. [1:21:41] » Yeah. Yeah. And I'm not interested in [1:21:45] open office space layouts [1:21:47] » And I you know that was a trend for a [1:21:49] long time and I'm sure you guys can can [1:21:53] can have have an opinion on that. From [1:21:55] everything I've read open office space [1:21:59] makes people less productive. [1:22:02] I I've read articles to that. I [1:22:05] Yeah, because of the distractions, I [1:22:07] guess. But [1:22:08] » Well, and I think we're building this [1:22:10] for public safety and for I mean, [1:22:13] » Primarily we want this to be [1:22:15] » People make sure [1:22:16] » Yeah, we want to be nice. Yeah, that's [1:22:18] that's the those are the spaces that I [1:22:21] least want to [1:22:22] » No one wants a cube [1:22:23] » Cut, right? [1:22:24] » We don't want cubes. [1:22:26] » Yeah, cubes are no fun for anyone. [1:22:30] Okay, [1:22:32] » I have intentionally been quiet for the [1:22:35] time being. I'm not pretending I am a [1:22:38] design expert on anything. Uh Chris can [1:22:41] attest to this though I've been through [1:22:42] this before um with with a project [1:22:46] similar actually bigger in size uh with [1:22:49] with the public safety thing. And uh I [1:22:52] just want to say first off from my [1:22:54] perspective uh the site design was the [1:22:57] most important thing operationally uh [1:23:00] administratively it was staff driven in [1:23:02] regards to the layouts of everything. So [1:23:04] I think that's the most important thing [1:23:06] as long as the designs whether it's one [1:23:08] through four at any point does not um [1:23:12] interfere with any of the operations or [1:23:15] with the public engagement. I think I'm [1:23:18] fine with that. If you had to ask me for [1:23:20] any type of um design element, I would [1:23:23] say make the walkways curvy. [1:23:26] » That's [1:23:26] » Meandering. We like to call it [1:23:27] meandering. [1:23:28] » Meandering. Um [1:23:29] » Please. [1:23:30] » I think you guys you did a great job. [1:23:32] » Yeah. [1:23:32] » With with with the layout um for the [1:23:34] site because I'm more operational on it. [1:23:36] Um and I would defer to the board and [1:23:38] preservation for for their direction as [1:23:41] well. [1:23:43] » Thank you. Anything else? [1:23:48] » Very good. Thank you. Well, [1:23:49] » Thank you all for such um thoughtful [1:23:52] commentary, honest commentary. Um it's [1:23:55] important for us to hear what you like [1:23:57] and what you don't like because that [1:23:59] helps us get to the best possible [1:24:01] solution. Um I also want to thank um our [1:24:04] entire team in addition to um our um [1:24:07] Riverside resident Joe and Kim. There's [1:24:10] another team of folks behind this effort [1:24:12] um at at our office that has really um [1:24:15] poured their heart and soul into this. [1:24:17] This is a really exciting project for us [1:24:19] to be a part of and we're really looking [1:24:22] forward to next steps. So, thank you [1:24:23] very much. [1:24:23] » Thank you. [1:24:24] » Thank you. [1:24:24] » Thank you. [1:24:25] » We're we're gonna talk about a potential [1:24:27] referendum now. So, you might want to [1:24:29] stick around and listen to this. [1:24:31] » How we pay for it [1:24:32] » Because that sounds super fun, right? [1:24:35] » So, yes. Next on the agenda is [1:24:38] discussion of regarding public safety [1:24:43] facility referendum. [1:24:46] Manager Francis, [1:24:47] » Thank you. Um, so as we embarked on this [1:24:50] journey back in November of 2024, it was [1:24:54] discussed that to bring this facility to [1:24:57] fruition, we would have to do a [1:24:59] referendum. We just didn't have the [1:25:01] capacity to look at alternative ways, no [1:25:03] matter how creative we are as a team. [1:25:06] You know, that that's a heavy lift. And [1:25:09] so, um, as part of the discussion, we [1:25:13] did reach out to Spear Financial, who is [1:25:16] the village's financial advisor, who [1:25:18] we've worked with in the past to issue [1:25:21] debt. Um, and so they provided us some [1:25:24] scenarios [1:25:26] relative to how much debt the village [1:25:29] could issue. Now, debt is dictated on [1:25:32] the village's equalized assessed value, [1:25:34] and you'll see up there. So, um, tells [1:25:38] you what the formula is for our limited [1:25:40] for our tax our debt limitation. Um, [1:25:44] currently our general obligation bonds [1:25:47] is 1.9 million. That's our limited tax [1:25:49] debt that we issued a couple of years [1:25:51] ago. And so, you deduct that and say how [1:25:54] much is left for you to issue as debt. [1:25:57] Now, as our equalized assessed value [1:25:59] continues to grow, so example, once the [1:26:02] PUD is built, that will go up. Um [1:26:07] typically every year your equalized [1:26:09] assessed value as a village continues to [1:26:11] increase based on improvements and [1:26:12] reinvestment in the community. Um so [1:26:15] that number that 34.9 million won't [1:26:19] remain static presumably you know if [1:26:23] staff and the village is doing [1:26:24] everything right that number will [1:26:26] continue to go up in future years. So [1:26:29] with that being said, we asked Spear to [1:26:33] provide us some examples. Um, and this [1:26:36] was be obviously when we had some ranges [1:26:40] and Harbors provided a little bit more [1:26:42] concrete numbers. So we did a max of an [1:26:45] issuance amount of 28 million it over 20 [1:26:49] years. That's the maximum time frame in [1:26:51] which we can do. And then it would show [1:26:53] the financial impact on typical ho [1:26:56] households based on the market value of [1:26:59] the home. And so it's broken out on [1:27:01] annual cost versus monthly costs. Um [1:27:05] obviously if we were to increase that we [1:27:08] would to 29 million you would see an [1:27:11] incremental increase. Um and we will [1:27:13] certainly get that for the board. We [1:27:15] weren't sure what was going to be cut or [1:27:17] how this discussion was going to where [1:27:20] it was going to go as it relates to size [1:27:22] and other eliminations, but we do have [1:27:25] the capacity to increase that issuance [1:27:29] amount. Um, now all of these are based [1:27:32] on certain percentages, 4% interest. [1:27:35] We're double A+ bond rated community, so [1:27:39] we're not quite at that triple [1:27:42] AAA bonding. Um but so we're receiving a [1:27:46] much lower rate than other communities [1:27:48] that don't have sound financial [1:27:50] practices, procedures, policies, etc. So [1:27:53] we benefit in that respect. And so there [1:27:56] are times even when you go for an [1:27:57] issuance amount. Let's say we went for [1:27:59] 28 million, but then there's I don't [1:28:02] want to get too far in the weeds, but we [1:28:04] get a really good interest rate and it's [1:28:06] less and we get a good discount rate. It [1:28:08] could actually be more than 28 million [1:28:11] that's issued to us. [1:28:13] Um, and so that's where those numbers [1:28:17] look like for that. And so part of the [1:28:21] initial discussion is do you you don't [1:28:25] want to ex you don't want to come up [1:28:27] against the maximum amount of your debt [1:28:30] limit, right? Because there could be a [1:28:32] need to issue debt to do an additional [1:28:35] referendum in the future. And so you [1:28:37] always want to keep that that buffer, [1:28:39] right? [1:28:40] you are also paying off debt year after [1:28:43] year too as it relates to you know when [1:28:47] I like to manifest when the referendum [1:28:49] is approved by our residents um that [1:28:52] number would slowly go down and our debt [1:28:54] capacity would continue to to increase. [1:28:57] Um that isn't to say that we want to [1:29:00] utilize all that debt capacity. [1:29:01] Obviously we are very much below um even [1:29:05] the halfway point of our debt capacity. [1:29:07] We're actually less than 1% of our [1:29:11] maximum capacity. So, um I'm sorry, less [1:29:14] than 10%. [1:29:16] So, all those being equal, you'll see [1:29:20] kind of the different breakdown of that. [1:29:23] Are there any questions relative to [1:29:25] that? [1:29:28] » If somebody is at home watching this and [1:29:30] can't really read that type, do you want [1:29:31] to give some examples? [1:29:33] » Sure. No potential examples. So for the [1:29:36] $28 million issuance, I would say on [1:29:39] average a typical household in Riverside [1:29:42] is valued at $500,000. [1:29:45] And so you would look at an annual cost [1:29:47] increase of $720.32 [1:29:51] and what that looks like monthly is [1:29:54] $60.3 [1:29:55] per month. [1:29:57] » Thank you. [1:29:57] » You're welcome. Thank you. [1:30:01] And once again, that's subject to [1:30:03] somewhat change. Another example is if [1:30:06] our EAV continues to increase, then that [1:30:11] impact per household then gets [1:30:13] redistributed too. Similar with with [1:30:15] property tax. Um, if we have new [1:30:18] developments, [1:30:20] the spread of that property tax burden [1:30:22] gets redistributed. [1:30:24] » And so that in impact could be slightly [1:30:26] different. I don't want to say it would [1:30:28] be substantially different but uh just [1:30:30] to provide a little bit of context. [1:30:35] » Very good. And [1:30:37] » So we will uh we don't have to uh file [1:30:41] the referendum question till late in the [1:30:43] year. Right. [1:30:44] » Correct. So we we'll start the process [1:30:46] later this year and interally. [1:30:50] » And from my understanding the referendum [1:30:52] question can be a little bit more direct [1:30:54] than the last one. Oh yes, 100%. [1:30:58] » I could basically just say, you know, do [1:31:01] you approve of the village borrowing [1:31:04] this amount of money for a public safety [1:31:05] facility more or less [1:31:07] » And to equip the public safety [1:31:09] » To equip Yeah. Yeah. So [1:31:11] » So which election? The presidential [1:31:13] election? [1:31:13] » No, it would be [1:31:15] » Uh April of 2027. [1:31:18] » Consolidated. [1:31:19] » Yeah. [1:31:19] » Yeah. [1:31:20] » Yeah. [1:31:22] So, I know the trustees know this, but [1:31:25] I'm and I've said this to you before, [1:31:27] but I'm going to say it again and again [1:31:30] and again and again. Um, [1:31:33] this is the most important thing any of [1:31:35] us will do as an elected official in [1:31:37] this village. [1:31:39] Um, [1:31:41] our number one obligation is public [1:31:44] safety [1:31:46] and to maintain that the the great level [1:31:50] of public safety this village has always [1:31:52] had, our first responders need [1:31:56] facilities that are appropriate and [1:31:59] support a top-notch [1:32:03] police and fire public safety uh [1:32:05] department. So, uh, it is incumbent upon [1:32:09] all of us to do everything we can to [1:32:12] educate the public about this. [1:32:15] Um, and we'll be working on educational [1:32:20] information and strategies. [1:32:22] Um, and that will come soon. Uh, but I [1:32:26] would say it's not too early to start [1:32:28] talking to your neighbors, make people [1:32:30] aware of this. [1:32:32] Um because I [1:32:35] strongly believe that if people [1:32:37] understand the need for this, it will be [1:32:40] approved. Uh [1:32:41] » I agree. [1:32:42] » Riverside residents [1:32:44] value our police and fire departments [1:32:48] uh and they know that uh they have to [1:32:52] they have to support them financially. [1:32:58] » With that, any other questions, [1:32:59] comments? M manager Francis, did you [1:33:02] have some additional comments? [1:33:04] » Um, so with regard to community [1:33:06] engagement, Williams Architects also has [1:33:09] built in um some future community [1:33:12] engagements. Um, one being creating an [1:33:16] open house to solicit feedback on the [1:33:18] different design, see what additional [1:33:21] feedback residents have, bring that back [1:33:23] to the village board. Um, and then they [1:33:25] would also do a second round of [1:33:27] community engagement. Right now, we have [1:33:29] tentatively in our schedule July of [1:33:32] 2026, but that could be subject to [1:33:34] change because obviously going from that [1:33:37] second engagement period to April of the [1:33:39] following year for the election, I don't [1:33:42] know that if we want that long of a time [1:33:44] span to occur with not that the board [1:33:49] and staff wouldn't push out additional [1:33:51] education and answer questions and do [1:33:53] open houses, but that may be something [1:33:55] that we would look to the board to have [1:33:57] further discussion. and and work with [1:33:59] Williams to maybe change that timeline [1:34:01] for that second engagement piece. Um, [1:34:04] additionally, um, there there would be [1:34:07] subsequent presentations to the village [1:34:09] board. Once we have the community, the [1:34:11] initial community engagement and the [1:34:13] openhouse, feedback from preservation, [1:34:15] modifications to the design, then [1:34:18] Williams will be firming up their [1:34:20] designs further to get closer to what [1:34:23] some what this building will look like. [1:34:26] Um so in the past I also wanted to make [1:34:30] a note how we handled community [1:34:32] engagement when we were having [1:34:33] referendums right we've always had the [1:34:35] discussion that we can educate we cannot [1:34:38] advocate um as staff village resources [1:34:41] cannot be put towards advocating a [1:34:44] resident calls us and asks questions we [1:34:45] can ask answer those questions if a [1:34:47] resident calls and asks us how should I [1:34:49] vote we can't answer that question um in [1:34:53] the past what we have done is we've [1:34:55] created postcards and redirected uh [1:34:59] residents to a main landing page on the [1:35:02] website. We've done engagement. Both [1:35:05] village board members and staff have [1:35:07] been present present at different [1:35:09] community events, whether it's the [1:35:11] farmers market or other events. We've [1:35:13] created videos from Riverside TV to to [1:35:18] outline the different items and issues, [1:35:20] answer questions. Additionally, what um [1:35:23] staff has put together and flagged as [1:35:27] additional opportunities, uh Director [1:35:29] Buckley and I have already spoken about [1:35:32] doing public safety tours. Um [1:35:34] Absolutely. [1:35:35] » So, Director Buckley would it would be [1:35:38] sign up because we we would want him to [1:35:41] be able to answer questions. So, it [1:35:42] would be smaller groups, more uh tours, [1:35:46] but being able to have that engagement, [1:35:49] answer those questions. Um we would also [1:35:53] um in speaking with other communities [1:35:56] what they've done um when they have a [1:35:58] large referendum is presenting to other [1:36:00] taxing bodies. So staff or the a board [1:36:06] member presenting just FAQs and [1:36:09] information at a school district. So, [1:36:11] district 96 at one of their meetings or [1:36:14] district 208 or even going to the [1:36:17] library at one of their meetings and [1:36:19] presenting or township, right? Township [1:36:22] covers a little bit more than Riverside, [1:36:24] but it offers that additional [1:36:26] opportunity for engagement. Um, and then [1:36:31] finally, I think there have been some [1:36:33] questions of whether or not to hire a [1:36:35] consultant for um, further engagement. [1:36:39] And um, I'm doing some additional [1:36:41] research. Williams is going to provide [1:36:43] us um, some consultants that they've [1:36:45] worked with in the past. Um and then we [1:36:48] would get some different proposals [1:36:50] costing of those different services and [1:36:53] what the village would be receiving and [1:36:55] then making that evaluation of whether [1:36:57] or not these services can be done [1:37:00] in-house effectively or if we would need [1:37:02] some support from an outside party. [1:37:05] » I have a question. [1:37:08] I'm pretty sure I know the answer to [1:37:09] this, but I just want you to say it [1:37:11] again out loud. So as village trustees I [1:37:15] know that you cannot say anything about [1:37:17] um not how to but like you can't give [1:37:20] opinion [1:37:22] what are the rules regarding what we can [1:37:24] say and how we can interact with this [1:37:27] referendum. [1:37:28] » So you can certainly provide information [1:37:30] and you are a private citizen so you can [1:37:33] also [1:37:34] say what your thoughts are relative to [1:37:38] that. Staff cannot do that. Um and so I [1:37:42] I will make sure that attorney pickrol [1:37:44] provides additional guidelines for the [1:37:46] board as we begin on this journey. [1:37:50] » Okay, great. [1:37:51] » And just put it another way, we as [1:37:55] trustees on our own time [1:37:57] » Can advocate all we want [1:37:59] » As private citizens, not as trustees. [1:38:01] Yep. [1:38:01] » Right. [1:38:02] » Because we're not spending village res [1:38:04] the key is you can't spend village [1:38:06] resources to advocate. [1:38:08] » Yep. [1:38:09] staff time or money for flyers that say [1:38:13] vote no or vote yes. [1:38:14] » Sure, [1:38:15] » Those kinds of things. So, [1:38:16] » Yeah, [1:38:17] » I know it is a little outdated, but 12 [1:38:19] years ago, wasn't there a video that was [1:38:21] made of our facilities that were [1:38:22] crumbling and deteriorating? [1:38:24] » We do have those as well. [1:38:26] » Put that out for public education as [1:38:27] well. I know it's a little outdated, but [1:38:29] it's [1:38:30] » We would and we would create new videos. [1:38:32] So, in speaking to a couple of village [1:38:34] managers that recently did referendums, [1:38:37] um they did much shorter videos um that [1:38:40] were less than like the target was 30 [1:38:42] seconds or less essentially um and [1:38:46] sharing that information. And I think [1:38:48] also the engagement within the police [1:38:51] department and the fire department and [1:38:53] providing those tours um because a lot [1:38:56] of these areas are they're they're not [1:39:00] accessed by residents and so residents [1:39:03] don't know what are behind these [1:39:05] different doors. And so I think that can [1:39:07] be also very eye opening. [1:39:08] » Okay. And I think we all know that Chief [1:39:10] Buckley is not shy in front of a camera. [1:39:13] So, I think we can get him to do some [1:39:16] great videos for us. [1:39:22] » You're welcome. [1:39:22] » Very good. [1:39:24] » Anything else? [1:39:26] » The final item um within the packet, it [1:39:29] talks about the business district. So, [1:39:31] Ryan LLC [1:39:34] um acquired Kain McKenna, who was the [1:39:37] previous firm that created the business [1:39:39] districts, the three business districts [1:39:40] along Harlem Avenue. And so we did have [1:39:43] the discussion previously about creating [1:39:46] a business district overlay over the new [1:39:49] facility [1:39:51] um simply for the assessing the 1% [1:39:55] business district tax and that money can [1:39:57] then be used to be reinvested within the [1:40:00] facility or anything within the [1:40:02] boundaries of the facility or actually [1:40:04] helping to pay off some of the debt that [1:40:06] is issued. Um, in speaking with them, [1:40:09] they had recommended that the first step [1:40:12] would be to actually do an evaluation of [1:40:15] the revenue that could be derived from a [1:40:18] space of that size um to make sure that [1:40:22] it it makes sense to make the larger [1:40:25] investment. So, the cost of just doing [1:40:27] that evaluation is 2500. And then if if [1:40:32] it did make sense then creating the [1:40:34] business district plan and doing the [1:40:37] evaluation and conducting the process [1:40:39] that would be 20,000. [1:40:42] So [1:40:43] » But right now do you want direction from [1:40:46] the village to proceed with the $2,500 [1:40:48] to do the analysis? [1:40:50] » Yes. [1:40:51] » I know that's in your spending authority [1:40:52] but we should have direction from the [1:40:54] board. [1:40:55] I was just wondering if you could [1:40:57] provide residents with some examples of [1:40:59] sales tax generating opportunities and [1:41:01] this is precisely going to do that. So [1:41:03] I'm all for it. [1:41:05] » Yes, please. [1:41:07] » So right now how the site plan is laid [1:41:11] out there is the main space with the [1:41:14] kitchen. So presumably any so we could [1:41:17] contract with individuals to then assess [1:41:21] the 1% business district tax on any [1:41:23] catering services that are done out of [1:41:25] that room. And then there's the other [1:41:27] smaller space that I'll refer to as the [1:41:30] cafe that was left open. um that then [1:41:35] whatever [1:41:36] pro services are provided out of there [1:41:39] or products rather um so smoothies, [1:41:42] coffee, whatever it may be then that 1% [1:41:45] tax would be also assist there. Also, in [1:41:48] addition, the business district tax, it [1:41:50] would not just be that, but you'd also [1:41:52] have the opportunity to, you know, any [1:41:55] sales that are generated would be the 1% [1:41:59] regular sales tax and then the 1% uh [1:42:03] non-home roll sales tax. [1:42:05] » Yep. [1:42:05] » So, non-home rule sales tax would go [1:42:07] directly to streets, the 1%, and I take [1:42:10] that back. Also, places for eating tax, [1:42:12] which would be 1%. [1:42:14] » Nice. Thank you. Anything [1:42:18] else? [1:42:19] » No, I just need direction on the [1:42:21] » Oh, yes. Please proceed. [1:42:24] » Yes. [1:42:24] » Okay. [1:42:26] » Trustees, any other comments, questions [1:42:28] on referendum or public safety [1:42:31] facilities. [1:42:33] » Just want to thank staff for all the [1:42:35] work [1:42:37] » It's this is really big and very [1:42:39] exciting, but it's done a lot of work [1:42:41] and heavy lifting and appreciate it. [1:42:44] » Thank you. [1:42:44] » Thank you. Awesome. [1:42:47] » And thanks to previous boards too and [1:42:51] presidents who have championed this [1:42:54] endeavor as well. [1:42:57] Uh so we do not have need for an [1:42:59] executive session. I'd like to ask for a [1:43:02] motion and a second to adjurnn. [1:43:04] » So moved. [1:43:05] » Second. [1:43:05] » All in favor say I. I. Any opposed? [1:43:10] I know you there tonight.