1 00:00:41,330 --> 00:00:49,670 Well, welcome to the community to develop a committee, March 21st edition. We'll start out by introducing ourselves and who we represent. 2 00:00:53,440 --> 00:01:00,400 Sean Anderson District 2 represent part of St. Joseph Township and part of Somerset Town. 3 00:01:01,920 --> 00:01:06,360 Ryan Sterling district 13 and represent part of the city of Nürtsman. 4 00:01:08,450 --> 00:01:15,010 Jerry Van Zollman, represent district 18 and that's pretty much a village of Baldwin and a little bit out north about to the primary area. 5 00:01:18,580 --> 00:01:27,840 Scott Conor represent for district 11, which is most of St. Perry township, a sliver of New York City. 6 00:01:27,840 --> 00:01:30,940 Richmond area and the village of Starbury. 7 00:01:33,010 --> 00:01:37,970 My name is Dan Hanson and I'm district 12 and I'll represent the rest of 8 00:01:37,970 --> 00:01:38,290 the Richmond. 9 00:01:41,220 --> 00:01:44,100 I'm Jason Sheesett, Community Development Director, 10 00:01:47,390 --> 00:01:49,410 Ken Wint, County Administrator. 11 00:01:50,230 --> 00:01:53,050 John Hilger's planner, Community Development Department. 12 00:01:55,300 --> 00:01:57,500 Julie Peterson, Community Development Department. 13 00:01:59,410 --> 00:02:00,170 All right. 14 00:02:00,170 --> 00:02:05,790 The first on our agenda is approval for the minutes of Thursday, February 15. 15 00:02:06,590 --> 00:02:09,630 Does anybody have any questions, comments or concerns? 16 00:02:10,610 --> 00:02:13,070 Then let's just let those stand as approved. 17 00:02:14,130 --> 00:02:19,170 And we'll move right into our public hearing, opening public hearing for... 18 00:02:20,010 --> 00:02:22,430 Oh, yeah, okay, public comment. 19 00:02:22,510 --> 00:02:23,990 Is there anybody in the audience? 20 00:02:24,890 --> 00:02:25,990 Well, sure. 21 00:02:31,410 --> 00:02:34,550 I'm going to guess, let me just guess it's Kim Dupri. 22 00:02:35,570 --> 00:02:38,390 Very good. Kim Dupri, Marina and St. Karimina Soda. 23 00:02:39,230 --> 00:02:42,990 But I do extensive work with the folks over here concerning water quality. 24 00:02:43,950 --> 00:02:46,410 I just wanted to give you a quick update from what I was here last month. 25 00:02:46,490 --> 00:02:55,970 Emerald Sky Dairy, we got confirmation from both county and DNR that they have been purchased by the 26 00:02:57,230 --> 00:03:07,910 And so anyway, they have a Ridge Breeze dairy down in Pierce County that is currently permitted with a Vanguard renewables digester. 27 00:03:08,870 --> 00:03:13,770 And so I went to bring tonight the folks that I've been working with in Wapaqa, Wisconsin. 28 00:03:14,490 --> 00:03:17,490 They've done a lot of digging one of them's a Ph.D. researcher. 29 00:03:17,490 --> 00:03:25,410 And she came up with their non-compliance, their violations in Massachusetts and Vermont. 30 00:03:25,830 --> 00:03:28,490 We've got 52 of them in the last three years. 31 00:03:29,110 --> 00:03:32,490 And some of these are very concerning, because they're like hydrogen sulfide, 32 00:03:33,870 --> 00:03:39,090 being an excess of 500 parts per million, which can kill humans very quickly. 33 00:03:40,110 --> 00:03:41,530 That happened about four times. 34 00:03:41,610 --> 00:03:44,430 There was some very close calls around the 400 mark. 35 00:03:44,430 --> 00:03:49,870 So, I just wanted to bring this to your attention, because Emerald Skydairy does have a bio-gas 36 00:03:51,010 --> 00:03:52,550 Lotment in their permit 37 00:03:53,330 --> 00:04:00,690 From 2001. So I want you to be aware of this. Maybe get out of head of it. It might be a good idea 38 00:04:01,450 --> 00:04:08,110 And then I'll just give you a quick update about Lynn Township in Wapaka. I wouldn't spoke there if they're public hearing of every 28th 39 00:04:09,130 --> 00:04:14,530 The township denied the Dialgestor there in Lintownship in Wapaka County. 40 00:04:15,230 --> 00:04:16,950 They base that off of the truck traffic. 41 00:04:16,950 --> 00:04:20,190 It was going to generate the herd size of the dairy. 42 00:04:20,670 --> 00:04:24,710 The zoning changes were going to be intensive industrial. 43 00:04:25,750 --> 00:04:28,830 And they have other parts in the township that are zoned for that. 44 00:04:29,250 --> 00:04:32,390 And didn't feel that putting an island in the middle of the township 45 00:04:32,390 --> 00:04:34,930 would be a good idea long term. 46 00:04:34,930 --> 00:04:41,710 That was their rationale because they have the utilities and stuff set up in other parts of the township for that's types of 47 00:04:42,110 --> 00:04:42,430 facilities 48 00:04:43,010 --> 00:04:44,950 They were worried about the pipeline standards 49 00:04:44,950 --> 00:04:48,990 They were worried about the flaring off of the gas that doesn't get shipped out 50 00:04:49,890 --> 00:04:58,170 They were very very very concerned about the first responder stuff because a lot of these stacks are a lot higher than what the ladders are for the fire trucks 51 00:04:58,170 --> 00:05:01,270 So they were very concerned about that as well 52 00:05:02,510 --> 00:05:09,890 And again, they didn't want anything in the middle of the township, so they denied that I guess because they're under county zoning, this might go before their whole county board. 53 00:05:11,150 --> 00:05:16,550 So they're, it's not over quite yet, but I just want to give you that update, that's what's going on. 54 00:05:16,610 --> 00:05:23,470 And that bank, our company is the same one that is the same, we're working with the breeze group that might end up at Emeralds. 55 00:05:23,510 --> 00:05:27,610 So that's my update. I'll let you know when we know more, thanks. 56 00:05:29,050 --> 00:05:32,770 Thank you, Kevin, is there anybody else in the audience that would like to speak for 57 00:05:32,770 --> 00:05:33,690 public comment? 58 00:05:35,510 --> 00:05:35,830 All right. 59 00:05:36,630 --> 00:05:40,610 Then let's start this public hearing concerning rezoning in the town of 60 00:05:40,610 --> 00:05:42,150 Ogali for Ericsson. 61 00:05:51,270 --> 00:05:53,430 Good afternoon, Mr. Chairman and committee members. 62 00:05:53,610 --> 00:05:57,290 The public hearing tonight is for a rezoning application by the Bruce and 63 00:05:57,290 --> 00:05:58,570 Jane Ericsson living trust. 64 00:05:59,030 --> 00:06:00,350 This is in the town of Ogali. 65 00:06:00,550 --> 00:06:02,810 It's a 47 acre parcel. 66 00:06:02,810 --> 00:06:04,730 We'll get to a location map in just a minute. 67 00:06:04,730 --> 00:06:12,810 So, the current zoning is egg one agricultural, the applicant is seeking an R2 residential zoning district. 68 00:06:16,200 --> 00:06:23,640 The application specifies that the intention is to obtain the R2 zoning designation for this 47-acre parcel, 69 00:06:24,200 --> 00:06:31,840 which would align it with other properties that the trust owns along 30th Avenue just to the southeast of the subject parcel. 70 00:06:31,840 --> 00:06:36,560 As a reminder for committee members, the current egg one zoning district allows 71 00:06:36,560 --> 00:06:41,380 egg or cultural uses in limited residential development with the density of one 72 00:06:41,380 --> 00:06:47,300 dwelling unit per 40 acres. Under the R2 zoning district, most egg or cultural 73 00:06:47,300 --> 00:06:53,280 uses would be allowed, except major livestock facilities, egg entertainment, and 74 00:06:53,280 --> 00:06:58,440 biopower and manure processing uses. The R2 zoning district would allow major 75 00:06:58,440 --> 00:07:05,480 subdivisions, which an intolerable galley would be two acre lot minimums. It is not the intention 76 00:07:05,480 --> 00:07:11,800 of the applicant to do any development at this time. Again, it is to align this parcel with 77 00:07:11,800 --> 00:07:14,100 other parcels that are owned by the trust. 78 00:07:19,150 --> 00:07:22,150 Next, just taking a look at some of the general location 79 00:07:22,150 --> 00:07:22,810 maps, 80 00:07:25,960 --> 00:07:31,140 a 47 acre parcel outline in blue at the tip of the arrow, like south of Coney Inn and south 81 00:07:31,140 --> 00:07:38,260 the I-94 in the town of O'Galea, and then zooming in just a little bit farther, you'll see 82 00:07:38,260 --> 00:07:41,120 200, sorry about that. 83 00:07:43,590 --> 00:07:48,130 You'll see 230th Avenue along the west side of the parcel. The 84 00:07:48,130 --> 00:07:54,090 general area is comprised of farm areas, which are cropped. You'll see scattered woodland 85 00:07:54,090 --> 00:07:59,750 areas. You'll see some intermittent streams that kind of bicec the property, and then we have 86 00:07:59,750 --> 00:08:05,030 livestock facility, just to the southwest, along 230th Avenue. 87 00:08:06,210 --> 00:08:09,750 General features the property taken a quick look at the zoning map. 88 00:08:10,130 --> 00:08:14,010 You'll see in the town of O'Galley the do support a number of different zoning districts. 89 00:08:14,230 --> 00:08:16,850 We'll talk about in just a minute with the comprehensive plan. 90 00:08:17,150 --> 00:08:23,430 But the subject parcel outlined in blue is currently zone A1, surrounded by various zoning 91 00:08:23,430 --> 00:08:29,350 districts, agricultural zoning districts, and the R1 and R2 categories. 92 00:08:31,010 --> 00:08:34,410 Next we take a look at the tonalogale comprehensive plan. 93 00:08:34,910 --> 00:08:39,370 In accordance with state statute, rezoning requirements or rezoning applications must 94 00:08:39,370 --> 00:08:40,950 be consistent with state statute. 95 00:08:42,230 --> 00:08:47,110 So take a look at the tonalogale future land use map from their comprehensive plan. 96 00:08:47,130 --> 00:08:50,330 You'll see the subject property outlined in red. 97 00:08:50,330 --> 00:08:52,970 Again, this is from the Tonovogale plan. 98 00:08:53,790 --> 00:09:02,190 You'll see the areas in white would support egg 1 and egg 2 zoning districts along with residential, the R1 and R2 districts. 99 00:09:03,630 --> 00:09:13,230 The Tonovogale, while they do support agricultural activity in their town, they also support the ability for owners to subdivide their property for residential development. 100 00:09:13,230 --> 00:09:26,150 The town also supports the C2 zoning district in this white area, and again that would be a zoning that would allow egg entertainment uses, not the subject of this rezoning application. 101 00:09:27,190 --> 00:09:32,730 Tonovogale, future land use summary, a couple policies they reference from their comprehensive 102 00:09:32,730 --> 00:09:37,010 plan is to create a balance between residential and commercial growth along with their 103 00:09:37,010 --> 00:09:42,610 egg production and also promoting economic growth but retain the real character of the 104 00:09:42,610 --> 00:09:49,710 town. Next, we take a quick look at the county comprehensive plan. County policy has been 105 00:09:49,710 --> 00:09:54,470 to match and reflect the comprehensive plans of the local tones. 106 00:09:55,290 --> 00:09:59,450 So for this reason, the county comprehensive plan 107 00:09:59,450 --> 00:10:02,170 designates this property as a mixed rural agriculture. 108 00:10:03,230 --> 00:10:06,690 You can see from this designation that includes farmland, 109 00:10:06,910 --> 00:10:11,150 scattered open lands, wooded areas, egg-related uses, cottage industries, 110 00:10:11,730 --> 00:10:13,970 and limited low-density residential. 111 00:10:14,950 --> 00:10:19,170 So from that aspect, the county future land use map would also be 112 00:10:19,170 --> 00:10:24,030 system with the rezoning application, the designation in the county 113 00:10:24,030 --> 00:10:30,850 complaint would support A1, A2, R1 or R2 residential. Next we'll take a 114 00:10:30,850 --> 00:10:35,910 quick look at the natural resource map. The map on the screen shows that 115 00:10:35,910 --> 00:10:39,970 the property is included with an environmental courtyard along the south 116 00:10:39,970 --> 00:10:43,690 and east edge. And as mentioned earlier, that corresponds to some 117 00:10:43,690 --> 00:10:47,270 intermittent streams that run through the property that are more active 118 00:10:47,270 --> 00:10:49,910 after heavier precipitation events. 119 00:10:53,520 --> 00:10:56,380 You'll see from the diagram up above part of the property 120 00:10:56,380 --> 00:11:01,360 to the southeast is within a shore land overlay district, which is regulated by the county. 121 00:11:01,920 --> 00:11:08,780 These are areas within 1,000 feet of a navigable water, shown by this pond in the very 122 00:11:08,780 --> 00:11:16,640 lower corner within 1,000 feet. The property is also included within a floodplain overlay district, 123 00:11:16,780 --> 00:11:21,220 which kind of follows one of the intermittent streams. The county does have regulations 124 00:11:21,220 --> 00:11:28,000 that oversees short development in the shore land, they're regulated by chapter 16 and that 125 00:11:28,000 --> 00:11:33,720 establishes setbacks and pervious area limits, land disturbance and buffer vegetation requirements, 126 00:11:34,400 --> 00:11:40,160 if and when this property would ever get developed. Chapter 18 floodplain outlines the use of 127 00:11:40,160 --> 00:11:46,320 property having to comply with elevated structure requirements and limits on grading and filling. 128 00:11:48,440 --> 00:11:51,000 Next, we take a look at productive farmland. 129 00:11:51,180 --> 00:11:55,960 You'll see that some of the property does indicate soils that are considered a prime 130 00:11:55,960 --> 00:12:00,260 agriculture, but if you look at the remainder of the property, we have some areas of steep 131 00:12:00,260 --> 00:12:04,760 slopes in the middle and also some areas of gravel and sand deposits. 132 00:12:05,540 --> 00:12:10,920 So while some of this property is considered a prime agriculture, about half of it, does not 133 00:12:10,920 --> 00:12:14,840 meet that requirement based on our soil mapping layers. 134 00:12:15,840 --> 00:12:27,780 Next, we take a look at the agency review of the tonal lagale reviewed this request at their February 12th, 2024 meeting and the tone board recommended approval of the rezoning application. 135 00:12:29,460 --> 00:12:42,380 Following that, we have our technical review findings outlining one through four referencing tone policies and the request not being in conflict with the county resource management plan or chapter 15 zoning. 136 00:12:43,660 --> 00:12:49,300 We also say having to be consistent with the comprehensive plans of both the tone and the 137 00:12:49,300 --> 00:12:49,660 county. 138 00:12:50,040 --> 00:12:55,600 Again, we talked about natural resource, management plan, zoning ordinance, another 139 00:12:55,600 --> 00:13:01,300 criteria is that the tone is not disapproved the request and that the rezoning and use is 140 00:13:01,300 --> 00:13:06,380 consistent with the complaint that does not result in spot zoning, which it does not. 141 00:13:08,790 --> 00:13:14,250 Next, take a look at the staff recommendation and findings based on our review and the 142 00:13:14,250 --> 00:13:19,910 consideration of the request, we would recommend approval of the rezoning of the 47 acres 143 00:13:19,910 --> 00:13:26,870 to the R2 district based on the technical review findings. Number two, the future land use plan maps 144 00:13:26,870 --> 00:13:33,730 of both the town and county compliance support the rezoning request that the town board is recommended 145 00:13:33,730 --> 00:13:39,770 approval of the request and that the proposed use is consistent with and can comply with chapter 146 00:13:39,770 --> 00:13:46,290 15 zoning. And then with all requests coming out of the egg districts, we have to reference 147 00:13:46,290 --> 00:13:54,050 in our findings a number of answers to questions about the land being better suited for 148 00:13:54,050 --> 00:13:58,950 a use not allowed in the farmland preservation district. That the rezoning is consistent with 149 00:13:58,950 --> 00:14:09,330 the applicable comprehensive plan. That the rezoning is substantially consistent with the 150 00:14:09,330 --> 00:14:16,910 repair, limit agricultural uses surrounding this parcel of land, which it will not. 151 00:14:18,090 --> 00:14:25,390 As of 430 today, we have not received any public comments from the public notice that 152 00:14:25,390 --> 00:14:29,030 was sent to a budding owners and published in the local paper. 153 00:14:29,490 --> 00:14:32,270 That concludes the overview of this request. 154 00:14:33,690 --> 00:14:39,950 Next John, I'll ask if there's anybody from the public who'd like to comment, either in 155 00:14:39,950 --> 00:14:42,570 favor or opposed to this rezoning. 156 00:14:47,020 --> 00:14:50,700 All right, seeing none is a committee have any questions for John. 157 00:14:53,200 --> 00:14:58,220 I will close the public hearing and move into business item number one. 158 00:14:59,620 --> 00:14:59,980 And at this time. 159 00:15:00,000 --> 00:15:03,160 I would look for a motion. 160 00:15:07,340 --> 00:15:12,460 I make a motion that we grant this rezoning. The Bruce Erson. 161 00:15:13,580 --> 00:15:18,800 Very good. Is there a second? There's a second. Now is there any discussion? 162 00:15:21,000 --> 00:15:22,920 Seeing none. Let's put her to a vote. 163 00:15:31,120 --> 00:15:31,720 All of 164 00:15:31,720 --> 00:15:37,540 So, a presentation from Washington County, Minnesota, 165 00:15:38,080 --> 00:15:40,080 Land of Water, June, come on up there and introduce yourself. 166 00:15:46,030 --> 00:15:46,490 Thank you. 167 00:15:48,110 --> 00:15:49,890 Good afternoon, county supervisors. 168 00:15:50,210 --> 00:15:53,030 I'm June Mathowitz, resident of New Richmond. 169 00:15:54,130 --> 00:15:59,110 Here to present to you today an overview of a working model of a land and water legacy program. 170 00:15:59,610 --> 00:16:02,090 I know that I'm not here representing Washington County, 171 00:16:02,270 --> 00:16:06,090 but they have seen this presentation and they're fine with me, 172 00:16:06,090 --> 00:16:09,490 getting this presentation to tonight. I did work with the program for the last 10 years. 173 00:16:10,350 --> 00:16:15,610 So I am intimately familiar with the details and the operations of all of it and I really 174 00:16:15,610 --> 00:16:20,630 think that there are quite a number of people that would be in support of doing this kind 175 00:16:20,630 --> 00:16:25,390 of thing here. It is really good long-term planning and we know that it's really difficult to 176 00:16:25,390 --> 00:16:30,250 do long-term planning sometimes in local government, but this really helps move it along. It 177 00:16:30,250 --> 00:16:37,670 also helps generate the enthusiasm and bring the support forward for protection of water resources, 178 00:16:37,870 --> 00:16:39,310 especially in the county. 179 00:16:41,250 --> 00:16:45,250 As residents insist more of the advantage of the water they drink and the valued natural 180 00:16:45,250 --> 00:16:48,590 features in the county, including the nationally treasured sinkri river. 181 00:16:49,270 --> 00:16:56,030 This model is offered as an important planning and implementation opportunity that also 182 00:16:56,030 --> 00:16:59,230 provides a practical, flexible, and functional approach to water protection. 183 00:16:59,750 --> 00:17:04,850 This program can be seamlessly replicated, adapted, and incorporated into the county's work here. 184 00:17:05,290 --> 00:17:10,430 It is an attractive program around which everyone can unite and rally, because what it will do for 185 00:17:10,430 --> 00:17:13,650 is it's good for residents and the environment as it is for business. 186 00:17:14,890 --> 00:17:22,030 For the next few minutes, we'll provide a brief overview of neighboring Washington County's land and water legacy program as the potential model. 187 00:17:23,700 --> 00:17:28,220 The Land of Water Legacy Program is a highly valued program by residents there. 188 00:17:28,680 --> 00:17:32,680 Additionally, every project funded has done so with the unanimous county board support, 189 00:17:33,220 --> 00:17:35,540 and the elected who supported our popular with residents. 190 00:17:36,420 --> 00:17:39,520 We'll also share how this work connects with Washington County's comprehensive plan, 191 00:17:40,040 --> 00:17:44,040 how a personal land becomes eligible for the program, the important role of data and mapping, 192 00:17:44,620 --> 00:17:49,020 what the acquisition process looks like, but the ongoing commitment for a county is, 193 00:17:49,300 --> 00:17:52,080 the important role partnerships plan, the success of the program, 194 00:17:52,080 --> 00:17:54,600 and the resulting impact of this 20-year program. 195 00:17:57,280 --> 00:18:00,480 So brief overview, Washington County partners 196 00:18:00,480 --> 00:18:03,400 with landowners and organizations to purchase land 197 00:18:03,400 --> 00:18:06,120 and interest in land to keep it in its natural state. 198 00:18:06,820 --> 00:18:08,220 The land of water legacy programs started 199 00:18:08,220 --> 00:18:10,720 with a small win of state grant funds 200 00:18:10,720 --> 00:18:13,580 that put into motion a handful of successful projects. 201 00:18:14,180 --> 00:18:15,680 Soon residents were asking for more 202 00:18:15,680 --> 00:18:17,640 and then passing a voter-led ballot referendum 203 00:18:17,640 --> 00:18:20,980 by an easy majority, more than 60% of voters in favor. 204 00:18:20,980 --> 00:18:26,760 authorizing the county board to bond up to $20 million to protect land and interest in land. 205 00:18:27,820 --> 00:18:30,420 The results are concrete, measurable, and visible. 206 00:18:31,080 --> 00:18:36,900 With that $20 million now nearly spent, 47 projects on 1575 acres have been protected 207 00:18:36,900 --> 00:18:40,360 with partners investing more than $28 million in the county. 208 00:18:41,240 --> 00:18:47,040 So it draws an enormous amount of money into Washington County as well from outside sources. 209 00:18:51,110 --> 00:18:56,430 We highlight that this work is integrated into the county's 2040 comprehensive plan with 210 00:18:56,430 --> 00:19:00,750 goal policy and objectives language focused on protection, restoration and enhancement 211 00:19:00,750 --> 00:19:02,750 of high quality natural areas. 212 00:19:06,500 --> 00:19:11,280 Then in water like you see, we want to briefly highlight program eligibility criteria for 213 00:19:11,280 --> 00:19:12,300 a project or parcel. 214 00:19:12,980 --> 00:19:17,500 The first five bullets that you see here reflect language from the voter ballot referendum. 215 00:19:17,500 --> 00:19:26,600 You can see the themes, water, water, water, wetlands, trees, woodlands, parks, trails, open space, and public access. 216 00:19:27,480 --> 00:19:34,100 The letter bullet highlight additional criteria later established by the county board to provide further program direction. 217 00:19:34,940 --> 00:19:44,120 This includes prioritizing projects on the top 10 areas, priority areas map, projects that are adjacent to water, or other protected lands. 218 00:19:44,120 --> 00:19:50,720 projects requested by a city or township, projects serving multiple purposes and allowing 219 00:19:50,720 --> 00:19:55,440 public access, and projects leveraging additional dollars from other sources. 220 00:19:57,260 --> 00:20:03,840 Nothing plays a critical role in grounds decision making in data, which is lens the program 221 00:20:03,840 --> 00:20:05,800 of high degree of credibility with residents. 222 00:20:06,480 --> 00:20:11,280 The map on the right is the original land and water legacy program top 10 priority areas map, 223 00:20:11,740 --> 00:20:13,020 used until last year. 224 00:20:13,020 --> 00:20:17,860 The yellow areas inside the red circles are the 10 highest priority areas, 225 00:20:18,440 --> 00:20:24,380 parcels within these 10 areas, and along the rivers receive the highest priority ranking. 226 00:20:24,640 --> 00:20:30,360 We rank every project and focus projects and funding on the highest quality areas and features. 227 00:20:31,240 --> 00:20:35,300 The top 10 priority areas map is intended to be a guide and provide focus, 228 00:20:36,040 --> 00:20:39,860 but the county board ultimately decides if any given parcel becomes protected. 229 00:20:40,460 --> 00:20:48,080 The map on the left is the currently used map upgraded with the latest nature related data and adopted in December of 2023, so just 230 00:20:48,080 --> 00:20:54,980 most recently. You can see that this upgrade creates a connected corridor between the top 10 priority areas, 231 00:20:55,220 --> 00:21:02,140 and visually links them with the St. Croix in Mississippi rivers, which will run along the entire eastern and southern boundaries of Washington County. 232 00:21:02,140 --> 00:21:06,980 And not only connects these areas, but it recognizes that the buffer areas are also important. 233 00:21:07,820 --> 00:21:12,480 In summary, it is this key map that helps focus efforts in guide county decision making 234 00:21:12,480 --> 00:21:16,720 to ensure some of the most irreplaceable and highest quality features are protected. 235 00:21:20,410 --> 00:21:27,870 Just briefly, the mechanics behind a land acquisition project or the general flow of work completed 236 00:21:27,870 --> 00:21:30,730 once it comes into the county generally looks like this. 237 00:21:30,730 --> 00:21:38,530 Projects are initially, usually initiated by a landowner directly calling the county, or being referred by a conservation organization. 238 00:21:39,470 --> 00:21:44,190 The county only works with willing sellers. The county does very little to know outreach. 239 00:21:44,550 --> 00:21:52,570 Beyond its web page for this program, staff conduct research, create maps, review the site, complete assessments, and rank projects. 240 00:21:53,470 --> 00:21:59,230 The county board is then given an introductory presentation about the project and signals to proceed with the appraisal and surveying. 241 00:21:59,910 --> 00:22:03,670 A project typically receives two to four reviews by the board. 242 00:22:04,590 --> 00:22:08,670 Project or conservation easement terms are then worked out with a landowner, staff, seek 243 00:22:08,670 --> 00:22:14,270 a financial partner, or right grant proposals to provide project funding matches, and then 244 00:22:14,270 --> 00:22:17,030 the remaining due diligence is completed in closing occurs. 245 00:22:17,750 --> 00:22:22,950 In terms of internal structure at Washington County, the program and staff dedicated to the 246 00:22:22,950 --> 00:22:27,250 program work out of the Office of Administration and convene a project management team, 247 00:22:27,250 --> 00:22:32,570 with representatives of the public works and finance departments on a regular or as needed basis. 248 00:22:36,370 --> 00:22:40,670 Washington County's practice is to contribute 30 to 50 percent of a project assessed 249 00:22:40,670 --> 00:22:46,550 value source from referendum bonds and the county seeks the remainder in matching funds from 250 00:22:46,550 --> 00:22:51,650 partners. Cities are one of our most frequent partners as we support them in building the green spaces 251 00:22:51,650 --> 00:22:57,170 and connecting corridors that residents identify with livable, walkable, high quality and desirable living. 252 00:22:57,170 --> 00:23:01,770 We also do a fair number of conservation easements, so another of the program's most frequent 253 00:23:01,770 --> 00:23:04,030 partners is the Minnesota land trust. 254 00:23:04,590 --> 00:23:06,910 State funds are typically involved in every project. 255 00:23:08,050 --> 00:23:12,310 The bottom square is a list of the different partners the county has had over the now 23 256 00:23:12,310 --> 00:23:14,270 year life of the protection efforts. 257 00:23:15,390 --> 00:23:19,170 We note that there are funding mechanisms other than a referendum that could be used to start 258 00:23:19,170 --> 00:23:20,130 this work. 259 00:23:20,390 --> 00:23:25,790 Washington County's starting point was an initial small part of funds of state grant funds, 260 00:23:25,790 --> 00:23:32,950 not a referendum, seeking a feasibility report of your funding options may prove helpful to you 261 00:23:32,950 --> 00:23:36,150 as a board in discussing how to financially structure a program. 262 00:23:38,030 --> 00:23:42,490 In terms of ongoing commitments, once projects are complete, the ongoing commitment 263 00:23:42,490 --> 00:23:47,190 involves conducting site visits, restoring and enhancing a property's natural features, 264 00:23:47,290 --> 00:23:50,010 and assuring no violations of the protective terms occur. 265 00:23:54,630 --> 00:23:56,490 In summary, here again, are the numbers 266 00:23:56,490 --> 00:23:59,630 highlighting demonstrable results from 20 years 267 00:23:59,630 --> 00:24:02,210 plus of implementing a collective vision. 268 00:24:03,010 --> 00:24:05,030 These are solid numbers, but visiting the projects 269 00:24:05,030 --> 00:24:07,130 makes even more compelling case. 270 00:24:07,610 --> 00:24:09,350 A simple internet search for Washington County 271 00:24:09,350 --> 00:24:12,270 Land and Water Legacy Program will get you to a short video, 272 00:24:12,330 --> 00:24:14,030 showcasing some of the projects completed, 273 00:24:14,590 --> 00:24:16,110 or you could simply drive across the river 274 00:24:16,110 --> 00:24:18,110 to nearby projects and see them for yourselves. 275 00:24:18,650 --> 00:24:20,970 You would do well to start with the eyeball property 276 00:24:20,970 --> 00:24:24,050 in downtown, a northern downtown still water. 277 00:24:24,050 --> 00:24:27,490 The Conservation Area next to Lakeside Park in Bayport. 278 00:24:28,270 --> 00:24:33,550 Oxbow trails at Bellwind Conservancy in Afton or Law Lake Park in Woodbury. 279 00:24:34,170 --> 00:24:38,070 There's also a link to the webpage in a short video about the program on the next slide. 280 00:24:38,970 --> 00:24:40,350 Starting is of course everything. 281 00:24:40,610 --> 00:24:47,170 As an initial step, you may hear want to consider just setting up a program as a way to encourage people to donate natural areas to the county. 282 00:24:47,750 --> 00:24:52,450 I have met many landowners who want to pass on what they have had the privilege of enjoying to others, 283 00:24:52,450 --> 00:24:55,670 but they do need assurance that it will stay that way. 284 00:24:56,230 --> 00:25:00,270 Developing a program name and a simple well-designed web page that communicates the vision, 285 00:25:00,950 --> 00:25:07,150 eligibility, priority areas, and process may help inspire that sort of generous action and build trust with residents. 286 00:25:08,210 --> 00:25:13,590 A second phase could be to seek some state funding or matching funds from other sources to undertake a few projects, 287 00:25:13,750 --> 00:25:17,290 so everyone can understand the mechanics of how a project and the program would work. 288 00:25:17,290 --> 00:25:22,070 The point here being that there is a very, there is flexibility around how this work emerges. 289 00:25:22,510 --> 00:25:24,310 The important piece again is starting. 290 00:25:25,250 --> 00:25:27,770 So thank you for taking the time to consider this today. 291 00:25:28,310 --> 00:25:31,770 I forewarn you, you may find this work to be really fun in one of the more, 292 00:25:31,810 --> 00:25:36,070 if not most satisfying like a CZU could leave as a county board supervisor. 293 00:25:36,810 --> 00:25:42,430 I'm happy to take questions if there are some, or you may feel free to contact me with any questions as your time allows. 294 00:25:43,030 --> 00:25:46,030 You may obtain my email information from staff. 295 00:25:46,850 --> 00:25:48,110 Thank you so much. 296 00:25:48,430 --> 00:25:49,890 Do we have questions for June? 297 00:25:54,590 --> 00:25:55,350 We may have. 298 00:25:55,650 --> 00:25:58,050 And by email we can contact you, is that right? 299 00:25:58,470 --> 00:26:01,150 I deeply appreciate you taking the time to come in and see us today. 300 00:26:01,250 --> 00:26:01,690 It was fascinating. 301 00:26:02,090 --> 00:26:02,170 Thank you. 302 00:26:02,190 --> 00:26:02,570 You're welcome. 303 00:26:02,870 --> 00:26:03,630 Thanks for your time. 304 00:26:05,560 --> 00:26:05,880 Very good. 305 00:26:05,880 --> 00:26:08,780 We're going to move on to a presentation by Alicia. 306 00:26:09,940 --> 00:26:10,820 Environmental Education. 307 00:26:21,880 --> 00:26:22,360 Good morning. 308 00:26:22,880 --> 00:26:23,340 It's not morning. 309 00:26:23,660 --> 00:26:24,200 Good afternoon. 310 00:26:24,560 --> 00:26:24,780 Good evening. 311 00:26:25,200 --> 00:26:26,180 I'm Alicia Miller. 312 00:26:26,340 --> 00:26:29,820 I work in land and water conservation. 313 00:26:29,820 --> 00:26:32,820 We got our name back and very excited about that. 314 00:26:33,960 --> 00:26:44,000 I've been during this now for 20 years and Dan and Dan, Dan, Dan, I need new class. 315 00:26:45,980 --> 00:26:53,280 And Jason asked me to come in and present to you today about what I do because you were at the area contest, 316 00:26:53,600 --> 00:26:55,860 for the speech, a poster contest, and you're very interested. 317 00:26:55,860 --> 00:27:00,040 And so I have it said I would come in and let you know kind of what I do. 318 00:27:01,040 --> 00:27:06,140 So the education program that we have now in Sacred County is very unique in the county system. 319 00:27:06,940 --> 00:27:08,540 Of the 72 counties in Wisconsin. 320 00:27:08,560 --> 00:27:13,780 I think we were the first and maybe now there are two counties that actually have an educator on staff, 321 00:27:14,020 --> 00:27:18,320 who's not just staff doing education programs, but actually an educator to do that. 322 00:27:18,700 --> 00:27:21,960 And so as I go around the county and meet other counties like, 323 00:27:22,140 --> 00:27:23,500 this is your full-time job. 324 00:27:23,500 --> 00:27:29,300 like, well, it's part-time. But yes, it's my job. I don't do something else first. I started in 2003, 325 00:27:29,620 --> 00:27:35,260 but the program actually started in 2001 with Ruth Stern. And prior to that, there was no staff 326 00:27:35,260 --> 00:27:40,180 dedicated to that. It was just, people would come in and ask, and staff could, they would fill it in. 327 00:27:41,480 --> 00:27:49,820 So when I started in 2003, to just kind of give you an overview, we had about 2,625 contacts that year 328 00:27:49,820 --> 00:27:52,660 with different students or adults in those programs. 329 00:27:53,540 --> 00:27:55,760 We had 11 presentations that were requested. 330 00:27:57,120 --> 00:27:58,560 14 streaming college workshops. 331 00:27:59,020 --> 00:28:00,580 So you notice we get the kids in the stream. 332 00:28:01,180 --> 00:28:03,020 We do some water testing in the stream. 333 00:28:03,520 --> 00:28:05,140 Trying to as much hands on as possible. 334 00:28:05,840 --> 00:28:09,200 10 field days, which is essentially just still outside, 335 00:28:09,380 --> 00:28:10,440 but not in the water. 336 00:28:11,300 --> 00:28:13,200 Also, the conservation speaking contest 337 00:28:13,200 --> 00:28:15,380 and the conservation poster contest. 338 00:28:15,500 --> 00:28:17,500 That I'll talk about a little bit later here. 339 00:28:19,740 --> 00:28:25,420 In contrast, in 2023, we had 4,700 and 71 contacts. 340 00:28:26,080 --> 00:28:29,600 This is down, though, on an average, we have 5,100, 341 00:28:29,880 --> 00:28:32,120 but we're still trying to get back up from COVID. 342 00:28:32,460 --> 00:28:34,820 On COVID happen, it cut out our contacts 343 00:28:34,820 --> 00:28:35,780 at getting into the schools. 344 00:28:36,920 --> 00:28:40,920 So in 2003, we had 11 presentation requests. 345 00:28:41,160 --> 00:28:42,720 I had 65 last year. 346 00:28:44,060 --> 00:28:46,360 Six field days, a career day, the conservation 347 00:28:46,360 --> 00:28:48,260 and speaking of poster contests, 348 00:28:48,500 --> 00:28:49,700 Wisconsin and Byrathon, 349 00:28:50,300 --> 00:28:51,460 Halloween at Homestead, 350 00:28:51,740 --> 00:28:52,640 we've added adult programming, 351 00:28:53,360 --> 00:28:56,280 like snowshoeing the conservation partner meetings, 352 00:28:56,660 --> 00:28:58,520 parade and natives, gardening, 353 00:28:59,460 --> 00:29:02,220 master naturalist classes to help 354 00:29:02,220 --> 00:29:03,920 have volunteers at these field days 355 00:29:03,920 --> 00:29:06,000 where we get the kids out and we get hands on 356 00:29:06,000 --> 00:29:08,820 and let's try and find out about things. 357 00:29:10,720 --> 00:29:12,360 We also, with these educational field days, 358 00:29:12,380 --> 00:29:13,340 don't just work with schools, 359 00:29:13,480 --> 00:29:14,600 but work with youth organizations, 360 00:29:14,600 --> 00:29:19,280 like the scouts or with non-traditional classes. 361 00:29:20,180 --> 00:29:22,220 This is on the left as a classroom Hudson, 362 00:29:22,880 --> 00:29:24,040 and they say, can you get us out? 363 00:29:24,180 --> 00:29:25,200 I'm like, sure, you're running on the water, 364 00:29:25,440 --> 00:29:26,360 and that'd be fantastic. 365 00:29:27,320 --> 00:29:29,840 And so that was a day that we got to get these kids out 366 00:29:29,840 --> 00:29:31,520 who'd never been on that kind of stuff before. 367 00:29:31,900 --> 00:29:33,660 So that was pretty, pretty amazing. 368 00:29:35,740 --> 00:29:36,680 The classroom presentations, 369 00:29:37,400 --> 00:29:38,680 because on the only one you can do this, 370 00:29:38,760 --> 00:29:40,660 I can't get all the schools out into field days. 371 00:29:40,960 --> 00:29:42,420 So we can't do all these field days, 372 00:29:42,420 --> 00:29:44,280 But I can come to your classroom. 373 00:29:45,180 --> 00:29:46,600 And so I come in and we do. 374 00:29:47,280 --> 00:29:50,220 So the one on the left is stormwater pollution. 375 00:29:50,480 --> 00:29:52,240 So we talk about marna from agriculture, 376 00:29:53,060 --> 00:29:56,660 from construction, from industry, from golf courses, 377 00:29:56,900 --> 00:29:59,900 from sewage treatments, from homes and roads. 378 00:30:02,360 --> 00:30:07,820 I'm the right we're doing some soil testing, testing for pH and fast-first and nitrogen. 379 00:30:10,440 --> 00:30:11,200 We do programs 380 00:30:11,200 --> 00:30:16,840 on, again, stormwater. So, instead of on the left instead of having the display, this is when 381 00:30:16,840 --> 00:30:20,960 where it's a story we're reading, the kids come up and they pour their pollution into the bucket 382 00:30:20,960 --> 00:30:25,000 and they see it good dirty. They think that's really cool. We have a groundwater model, so we talk 383 00:30:25,000 --> 00:30:26,500 about groundwater and soils. 384 00:30:29,610 --> 00:30:30,930 We also corroborate with the community. 385 00:30:33,090 --> 00:30:36,890 So this was a school that came in and asked and said, 386 00:30:36,890 --> 00:30:38,690 I see you're teaching by rain gardens. 387 00:30:39,250 --> 00:30:40,390 Can you come work with our students? 388 00:30:41,330 --> 00:30:43,590 They had an after school garden clubs to help them. 389 00:30:43,730 --> 00:30:46,550 This is a rain garden that was at Hudson, middle school. 390 00:30:46,870 --> 00:30:48,330 It's not there anymore, because unfortunately, 391 00:30:48,530 --> 00:30:50,970 that's where they put the extension on on the building. 392 00:30:51,550 --> 00:30:54,690 But 10 years ago, it was a pretty awesome rain garden. 393 00:30:54,890 --> 00:30:56,510 It was a rain garden, a perennial garden, 394 00:30:56,510 --> 00:30:58,070 but she learned it was so cool. 395 00:30:58,230 --> 00:30:59,210 The kids loved to go out there. 396 00:30:59,850 --> 00:31:03,210 We do a environmental community events. 397 00:31:03,590 --> 00:31:08,430 So this was my, my now, she's 16 now, Vera. 398 00:31:09,110 --> 00:31:13,230 She's a, my friends daughter, but we did a STEM day 399 00:31:13,230 --> 00:31:16,370 at a school, we do Earth Fest, we've done River Fest, 400 00:31:16,650 --> 00:31:18,510 we've done Earth Day programs in the past. 401 00:31:19,570 --> 00:31:20,750 We work with the community. 402 00:31:21,010 --> 00:31:23,550 So this was just that water out of the FIPS. 403 00:31:23,790 --> 00:31:25,730 They wanted to had this education program, 404 00:31:25,730 --> 00:31:27,590 but they wanted an art part, art side of it, 405 00:31:27,590 --> 00:31:29,310 but they also wanted the science side of it. 406 00:31:29,370 --> 00:31:30,670 So I came and helped with the science, 407 00:31:31,250 --> 00:31:32,190 and then they didn't art projects. 408 00:31:32,410 --> 00:31:35,610 So you probably have seen this in Hudson, downtown. 409 00:31:36,950 --> 00:31:38,770 I don't know what wrote it's on them. 410 00:31:41,470 --> 00:31:43,450 Now down by the library, but up the hill of it, 411 00:31:43,530 --> 00:31:46,830 in that area, we've done library presentations. 412 00:31:47,550 --> 00:31:48,690 This was a model that, again, 413 00:31:48,830 --> 00:31:49,690 that in various gate models, 414 00:31:50,710 --> 00:31:54,650 but I dolled it up so we could leave it on the rack 415 00:31:54,650 --> 00:31:56,010 and people could walk by and read it 416 00:31:56,010 --> 00:32:03,650 they had as they could. Wisconsin land and water in my month of education. So as a county, 417 00:32:04,190 --> 00:32:09,210 there is a county, a group of counties, and we are part of the Wisconsin land and water 418 00:32:09,210 --> 00:32:12,850 in my month of education group. So this is all the land and water, soil and water conservation 419 00:32:12,850 --> 00:32:18,470 boards, and we have a conservation poster contest, a conservation speech contest. We help 420 00:32:18,470 --> 00:32:24,510 provide the Wisconsin environment and conservation camp. So these three posters up here were 421 00:32:24,510 --> 00:32:29,470 postures from this year, from the conservation poster contest, and it's divided into different 422 00:32:29,470 --> 00:32:36,730 grades, but we have here on the far left is a Let's Sister Floran from River, our sorry, 423 00:32:36,810 --> 00:32:40,750 from Hudson High School, and 10th through 12th grade group. And so if you took first 424 00:32:40,750 --> 00:32:45,530 at our contest, then they go into the area contest for their compete against eight other 425 00:32:45,530 --> 00:32:51,750 counties to took third at that contest. The winner of the area goes onto state, the winner 426 00:32:51,750 --> 00:32:55,390 the state actually goes up to the national contest and the national contest. You wouldn't 427 00:32:55,390 --> 00:32:57,570 like $100 or something. So that's kind of cool. 428 00:32:58,330 --> 00:33:05,610 On the top on the right is our second grader. She's from Evelyn Kupal from both side elementary 429 00:33:05,610 --> 00:33:11,930 school and she took second at the area contest. And then on the bottom there is Corbin Halvers 430 00:33:11,930 --> 00:33:17,230 and from Rufall's public monastery who also came in second at area. So these were our first 431 00:33:17,230 --> 00:33:19,450 in St. Greg County, but they took a second at the area. 432 00:33:21,150 --> 00:33:25,590 We have a conservation speech contest, and the speeches can be about any environmental 433 00:33:25,590 --> 00:33:31,210 topic, and so again, we have three different age groups on the left, where are elementary, 434 00:33:31,490 --> 00:33:36,730 so fifth and sixth graders, and then there's a seventh or eighth grade group, and then 435 00:33:36,730 --> 00:33:38,250 there's a nine through 12th grade group. 436 00:33:38,330 --> 00:33:41,890 And so this is where we actually had a senior examiner, he's in the senior group, but he's 437 00:33:41,890 --> 00:33:42,270 a sophomore. 438 00:33:42,750 --> 00:33:49,810 a human state. So he took first at our contest. He took first at area and he just won 439 00:33:49,810 --> 00:33:53,570 state. So that was pretty, I was pretty excited about that. I thought he was going to 440 00:33:53,570 --> 00:34:01,970 let's take. So that's Carter's duty. He's from New Richmond High School. And then in the elementary 441 00:34:01,970 --> 00:34:07,870 division, second on the left is Veda. She came in first at ours and she came in second at 442 00:34:07,870 --> 00:34:08,890 area contest. 443 00:34:11,500 --> 00:34:13,580 Another program that Wisconsin then 444 00:34:13,580 --> 00:34:16,320 and water does that we help to support it was the Wisconsin and 445 00:34:16,320 --> 00:34:20,200 Byrathon. It's the state's ultimate middle and high school 446 00:34:20,200 --> 00:34:23,620 environmental science challenge, where teams of five high school or 447 00:34:23,620 --> 00:34:26,780 middle school students participate in hands-on outdoor field challenges 448 00:34:26,780 --> 00:34:29,260 designed by natural resource professionals and educators. 449 00:34:30,160 --> 00:34:34,720 So they compete in forestry, on the bottom there that's 450 00:34:34,720 --> 00:34:38,680 aquatics, on the bottom of the left here are the right that's 451 00:34:38,680 --> 00:34:46,880 wildlife, the top of soils, and in the center is a current issue. So before the competition, 452 00:34:47,120 --> 00:34:50,240 they know what the current issue is, and they have to do the research and put it together 453 00:34:50,240 --> 00:34:53,440 with this presentation. And then the day out there, they actually get to go and do all these 454 00:34:53,440 --> 00:34:58,180 different stations. And they're all hands-on, so they're pretty cool. And we've Wisconsin. 455 00:34:58,540 --> 00:35:05,100 Wisconsin, St. Craig County has had a team participate each year from 2015 to 2019. And then again, 456 00:35:05,100 --> 00:35:07,260 and COVID things stopped. 457 00:35:07,620 --> 00:35:09,480 We've got new teachers, so we have to build a backup again. 458 00:35:10,140 --> 00:35:12,920 But this year's competition is April 19th, 2024, 459 00:35:13,740 --> 00:35:16,060 and it's always held at the Wisconsin Lions Camp 460 00:35:16,060 --> 00:35:17,040 and Roshal, Wisconsin. 461 00:35:19,800 --> 00:35:22,160 And then finally, we have our conservation camps. 462 00:35:22,220 --> 00:35:24,820 There's a middle school camp and a high school 463 00:35:24,820 --> 00:35:25,900 conservation camp. 464 00:35:26,340 --> 00:35:29,040 And so conservation professionals across the state 465 00:35:29,040 --> 00:35:32,040 come and they help their shepherds 466 00:35:32,040 --> 00:35:34,000 or their leaders of the different stations 467 00:35:34,000 --> 00:35:35,280 at the different things. 468 00:35:35,280 --> 00:35:44,800 There's just a canoe trip in this very center there that was a fire building competition all the kids are broken the teams and the first one to burn through the string one 469 00:35:44,800 --> 00:35:52,680 So that was pretty pretty intense pretty exciting for the high school one they do some things with shooting sports sometimes 470 00:35:52,680 --> 00:35:53,940 there's usually 471 00:35:54,720 --> 00:35:57,800 a conservation project so often they've done like 472 00:35:58,420 --> 00:36:04,880 invasive removal or they've done put shorter than restoration so they're getting an author to kind of do hands-on work to try 473 00:36:05,580 --> 00:36:10,740 learn about conservation progression and then finally the last thing I'll 474 00:36:10,740 --> 00:36:16,420 talk about today is that to do this work we have staff that can help but not as 475 00:36:16,420 --> 00:36:21,720 much as as you can see we have lots of people requesting things from us so I am 476 00:36:21,720 --> 00:36:26,280 partnering St. Rick County's partnering with Carpenter Nature Center and Willa 477 00:36:26,280 --> 00:36:30,060 River and Knickenick State Parks to run the St. Cray Valley Wisconsin Master 478 00:36:30,060 --> 00:36:33,980 Nationalist Program and so what that is is that those 479 00:36:33,980 --> 00:36:36,460 the Council Master Naturalist Program is similar to the 480 00:36:36,460 --> 00:36:40,120 Wisconsin or to master gardeners and that you go because 481 00:36:40,120 --> 00:36:43,700 an education and then after you had the education every year 482 00:36:43,700 --> 00:36:46,780 you do volunteer hours to help keep you current. 483 00:36:47,560 --> 00:36:50,180 But instead of learning just about gardens, we learned about all sorts 484 00:36:50,180 --> 00:36:52,540 of things naturalists related. 485 00:36:53,380 --> 00:36:56,020 And then at once they've gone through this 40-hour program, 486 00:36:56,780 --> 00:36:59,440 they are master naturalists and they could help volunteer 487 00:36:59,440 --> 00:37:02,220 and so we have them help at conservation field days. 488 00:37:02,220 --> 00:37:09,980 doing education. We've had them help with doing stewardship projects, so invasive removal, 489 00:37:10,700 --> 00:37:13,880 and we've had them help with, I always read the third one. 490 00:37:19,910 --> 00:37:23,930 So service leadership and life long learning air, what they come out with, so 491 00:37:24,670 --> 00:37:34,090 those are three things that we talk about. The master interest. This is our 2021 class, 492 00:37:34,090 --> 00:37:40,290 graduate graduating class, but we've done this since 2018, so this actually next Saturday 493 00:37:40,290 --> 00:37:44,330 starts our first class for the upcoming group, so thank you. 494 00:37:45,490 --> 00:37:47,830 Thanks so much for coming, anybody have any questions? 495 00:37:48,890 --> 00:37:52,270 Land and water program, education, excellent presentation. 496 00:37:52,990 --> 00:38:00,010 Mr. Chair, if I could add, we had our five-year WAN and water management plan review a few 497 00:38:00,010 --> 00:38:11,130 And one of the main things that set St. Craig County apart from other counties within the state is our outreach and education and the programming that we should does with our area of youth. 498 00:38:11,550 --> 00:38:15,470 And as she brought up, I think there's only two counties that are doing this in the state. 499 00:38:16,190 --> 00:38:22,750 But all those 50 100 contacts are within St. Craig County are very close to St. Craig County. 500 00:38:23,010 --> 00:38:25,370 So it is a huge impact and it is very vocal. 501 00:38:25,370 --> 00:38:25,470 Well, 502 00:38:28,720 --> 00:38:36,120 I know when I have contact with people like Mike Reiter and Buck Mallock and other people 503 00:38:36,580 --> 00:38:42,840 who work in nationalist community that everybody is always impressed with education efforts 504 00:38:42,840 --> 00:38:43,640 that are done here. 505 00:38:44,100 --> 00:38:51,120 And I know that they provide a source of knowledge, does a scholarship and they choose from 506 00:38:51,120 --> 00:38:51,980 that pool. 507 00:38:51,980 --> 00:38:58,880 So your work isn't always appreciated and we're proud of you. 508 00:38:59,340 --> 00:39:00,720 So thanks for your time. 509 00:39:01,140 --> 00:39:03,980 All right, we've got a meeting to conduct here. 510 00:39:05,320 --> 00:39:08,960 Let's get on to resolution approving text amendments 511 00:39:08,960 --> 00:39:11,100 to the town of Hudson Zoning. 512 00:39:12,000 --> 00:39:12,160 John. 513 00:39:15,710 --> 00:39:17,970 Mr. Chair and committee members, the town of Hudson 514 00:39:17,970 --> 00:39:21,530 is seeking County approval of some zoning text amendments 515 00:39:21,530 --> 00:39:31,230 Under state statute in Wisconsin, even counties with their own zoning ordinance are required to secure county board approval. 516 00:39:32,230 --> 00:39:39,790 In this particular case, the tone of Hudson is adding language to their sign ordinance for their industrial zoning district. 517 00:39:40,290 --> 00:39:44,730 Within your packet, you were provided copies 518 00:39:46,840 --> 00:39:47,760 of those standards. 519 00:39:47,760 --> 00:39:53,420 we have reviewed those standards. We don't see anything, you know, out of the ordinary or 520 00:39:53,420 --> 00:39:58,260 concerning with those standards. The other thing we did review is to ensure that the tone 521 00:39:58,260 --> 00:40:04,080 followed the proper public hearing notification. We were provided minutes from their plan 522 00:40:04,080 --> 00:40:10,500 commission and tone board meeting where they did approve those amendments. And so what we put 523 00:40:10,500 --> 00:40:17,420 together for your consideration tonight is a resolution that would ratify what the tone of 524 00:40:17,420 --> 00:40:21,720 related to their industrial zoning district sign provisions. 525 00:40:25,450 --> 00:40:25,850 Any questions? 526 00:40:28,320 --> 00:40:33,420 What? Just summarize. What are they adding? Are they in terms of signs? 527 00:40:33,860 --> 00:40:39,940 Actually, what they did is that when they last codified their zoning ordinance, they did not include 528 00:40:39,940 --> 00:40:46,240 industrial zoning district sign provisions. So they're actually adding in what they had in the 529 00:40:46,240 --> 00:40:53,160 8,000 and really it just establishes square footage requirements for free standing signs, 530 00:40:53,560 --> 00:40:59,880 they're illuminated signs, if there's a multi-tenant building, they establish standards for 531 00:40:59,880 --> 00:41:05,680 those types of facilities. So again, they're just getting back to where they were. They 532 00:41:05,680 --> 00:41:10,300 talk about monument, signage requirements, the width and the height and the square footage 533 00:41:10,300 --> 00:41:18,660 of those. Again, nothing either the ordinary or unusual that we we looked at. 534 00:41:19,260 --> 00:41:21,640 So it's not going to be like Las Vegas out there. 535 00:41:21,640 --> 00:41:22,120 No. 536 00:41:22,760 --> 00:41:23,060 We'll not. 537 00:41:25,690 --> 00:41:27,290 All right. This could be to have any questions. 538 00:41:29,310 --> 00:41:30,410 Does anybody have a motion? 539 00:41:33,750 --> 00:41:34,550 We need to approve. 540 00:41:34,550 --> 00:41:35,950 I'll do a motion no proof. 541 00:41:36,790 --> 00:41:36,810 All right. 542 00:41:37,330 --> 00:41:38,230 We have a second. 543 00:41:39,610 --> 00:41:40,690 All right. 544 00:41:41,010 --> 00:41:42,510 Any other further discussion? 545 00:41:43,950 --> 00:41:52,330 All right. All in favor say aye. Aye. Aye. Aye. Any opposed? Motion passes. We'll move on to business. 546 00:41:52,590 --> 00:41:58,050 Aye. Thank you. Number five. Thank you, John. Jason. Phase one, options. 547 00:41:58,590 --> 00:42:06,770 Eckert Bluffland Park developer. Thank you, Mr. Chair and members of the board. So at the last meeting, we talked about some options with the various trails. 548 00:42:07,690 --> 00:42:13,770 one was the northern part of the Eckert Blufflands Park. That was kind of ruled out 549 00:42:14,910 --> 00:42:19,250 immediately. We just due to the cost and the challenges with the terrain on site. 550 00:42:19,530 --> 00:42:26,090 Then we talked about the access here, which is in the black lines. The green lines are the park boundaries. 551 00:42:27,330 --> 00:42:34,630 Then if you remember the white lines here, those were the low cost alternative to get some trails out there. 552 00:42:34,630 --> 00:42:39,990 This is originally planned to be an ADH rail in the master plan, 553 00:42:40,070 --> 00:42:44,910 so it would be a paved trail, but our conversation at the last meeting was that this would 554 00:42:44,910 --> 00:42:49,210 be just be a gravel trail if the committee decided to pursue it. 555 00:42:49,210 --> 00:42:54,590 However, it would be prepped with a good enough base and stuff and with that it would 556 00:42:54,590 --> 00:43:00,230 allow for future pavement of a portion or all of it at some point. 557 00:43:00,230 --> 00:43:17,350 The committee also asked us to communicate with the St. Craig County Highway Department about their willingness and ability to design and install the park entrance here, which we have done. 558 00:43:17,350 --> 00:43:24,270 And I believe supervisor Anderson brought up about having a couple swing bridges and supervisor 559 00:43:24,270 --> 00:43:30,970 Conor also brought up about possibly having the Department of Army potentially help with the construction. 560 00:43:31,810 --> 00:43:37,330 So we've got a couple swing bridges and this will be a bigger phase of phase one, 561 00:43:37,590 --> 00:43:42,070 which would be the yellow lines in addition to the white lines. 562 00:43:42,070 --> 00:43:53,110 The black line here is the existing road going down to the Eckert cabin and the red line here that is River Heights Trail going into the park. 563 00:43:54,930 --> 00:44:00,070 So we don't have exact cost estimates for this. 564 00:44:00,550 --> 00:44:10,070 Last Thursday night I went to the town of St. Joel Tom board meeting to give them an update because before the prior meeting in February here. 565 00:44:10,070 --> 00:44:16,170 here and that Teresa Johnson had brought up and that they had not been approachable of vacating 566 00:44:16,170 --> 00:44:23,450 this northern chunk of highway or old highway 35 and so I went there kind of explained 567 00:44:23,450 --> 00:44:30,450 the process. The town informed me that they would like to have a memo of understanding with 568 00:44:30,450 --> 00:44:38,670 the county or an MOU for it to basically explain who's going to pay for what as far as like to 569 00:44:38,670 --> 00:44:45,030 move of old highway 35, which is our understanding that the colony would do that. Then they 570 00:44:45,030 --> 00:44:52,250 would have some cost for publication of a public hearing notice and to have their council review, 571 00:44:52,250 --> 00:44:59,850 the documents, the draft the documents for the actual vacation of this road, which 572 00:45:00,000 --> 00:45:09,260 We can probably do that. As we kept on talking, the original master plan had a call to sack, bought in this area right here on the map. 573 00:45:09,840 --> 00:45:15,020 And so they asked about that, and who's going to build that? And I'm like, well, I'm like a first taken in blocking off the road. 574 00:45:15,180 --> 00:45:17,060 We're going to have to build that call to sack. 575 00:45:17,880 --> 00:45:29,140 So that was all fine. But then there was also a conversation that they would like the county then to pay from the call to sack down to the town line, 576 00:45:29,140 --> 00:45:34,410 which the town of Hudson and town of St. Joe wine here is right at the horizontal line here. 577 00:45:35,420 --> 00:45:41,140 And so this whole road from New Highway 35 up to the Coltasac is about 1,800 feet. 578 00:45:42,360 --> 00:45:47,600 You know, so even paving this portion here from the Coltasac down to the town line, 579 00:45:47,620 --> 00:45:54,240 of course, it's going to require significant cost and improvements in order to do this access 580 00:45:54,240 --> 00:45:59,560 if the town is going to take and require the county to do this in order for that. 581 00:46:01,820 --> 00:46:07,620 So that's why we didn't get really far into the depth as far as what the cost estimates are 582 00:46:07,620 --> 00:46:13,280 going to be. We've got some other options that we could consider. We have not approached the town 583 00:46:13,280 --> 00:46:21,160 of Hudson yet and so the town of Hudson comes in from the south here. This is a very bad access point 584 00:46:21,160 --> 00:46:27,720 on new highway 35. There's been a couple of accidents there. But do we look at trying to bring 585 00:46:27,720 --> 00:46:33,580 this road out and maybe even extend itself a little bit to come up so that's more square 586 00:46:33,580 --> 00:46:43,100 to the new highway 35. If we did that, we probably have a lot less fill in this area and then 587 00:46:43,100 --> 00:46:50,740 maybe we would only pay a portion up to the park if we wanted to. So that's an option to consider. 588 00:46:52,400 --> 00:47:01,680 Talking with Robby too, there's some things that would have to be, you know, done as far as title searching, you know, to see what the history is behind old Highway 35. 589 00:47:03,680 --> 00:47:14,160 Or, supervisor Anderson, maybe we just overshot this a little bit, because you had originally asked about just trying to create some trails out there. 590 00:47:15,160 --> 00:47:22,080 But we were really concerned about the safety of people being able to get into the park as I guess why we brought this whole access issue. 591 00:47:23,020 --> 00:47:29,580 And so maybe we used the existing road going into the park, maybe we developed some of the trails. 592 00:47:30,620 --> 00:47:35,100 And we see how much use and how much demand there is for the area. 593 00:47:35,560 --> 00:47:44,140 And then we come back and we approach the access point in that time to see what our parking needs and what our access needs. 594 00:47:44,140 --> 00:47:51,560 really are if you'd want to do that. So but for sure you know and that there was 595 00:47:51,560 --> 00:47:56,720 kind of a $2 million number folded around at the last meeting it can definitely 596 00:47:56,720 --> 00:48:05,000 be done for that amount. We would simply build what we could and we could take 597 00:48:05,000 --> 00:48:09,940 in to get a better number refined to the kip budget process if you wanted to go 598 00:48:10,800 --> 00:48:19,680 I realized that we got a couple of months to do that, so that would give us time to go out and approach the town of Hudson here and move forward. 599 00:48:19,880 --> 00:48:25,040 But the highway department is definitely committed in helping with the trails and with the accesses. 600 00:48:25,140 --> 00:48:34,240 If we did go with the original access going up here, it may make sense to build everything in the black lines from a ball here north. 601 00:48:34,240 --> 00:48:40,340 So that would include the main parking lot entrance just because of the highway departments moved in. 602 00:48:40,440 --> 00:48:42,320 They got their big equipment there. 603 00:48:42,720 --> 00:48:47,880 It would make sense to take and create all of our storm water facilities at that same point. 604 00:48:48,060 --> 00:48:50,320 So that we're only disturbing an area at once. 605 00:48:50,920 --> 00:48:57,200 And then we could leave that gravel until we had the funds available to pave or improve it. 606 00:48:57,200 --> 00:48:58,240 But 607 00:49:00,290 --> 00:49:16,090 I guess what I'm looking for is whether the committee wants to move forward with just trails or if you're still on board with trying to create a better access into the park and what we can do there, how to proceed. 608 00:49:19,070 --> 00:49:26,110 A couple questions currently that red line is the existing access. 609 00:49:26,310 --> 00:49:26,910 Correct. 610 00:49:26,970 --> 00:49:32,630 The red line is the existing road going through here and it goes up to serve those. 611 00:49:33,050 --> 00:49:41,390 The original master plan had been removed from both the curve and the road to old highway 35. 612 00:49:43,330 --> 00:49:50,330 However, there's a pretty well-documented easement for the existing road that was actually 613 00:49:50,330 --> 00:49:56,270 surveyed and then there was a one rod and with on each side of that surveyed line for 614 00:49:56,270 --> 00:49:57,010 the road. 615 00:49:58,030 --> 00:50:03,850 So the county would have to negotiate easements and that to take and move this if you're 616 00:50:03,850 --> 00:50:04,910 going to go up to the north. 617 00:50:04,910 --> 00:50:09,970 So that's where we would suggest leaving this road as is. 618 00:50:10,750 --> 00:50:16,690 And but that there isn't anything stopping us from being able to use it because the colony owns the underlying land. 619 00:50:16,970 --> 00:50:20,070 And we do have a current parking area. 620 00:50:20,270 --> 00:50:21,010 It's very primitive. 621 00:50:21,250 --> 00:50:25,110 It's more like what you'd see a DNR field parking area. 622 00:50:25,670 --> 00:50:27,130 I'll bolt right in this area. 623 00:50:27,790 --> 00:50:34,890 That would be very easily expanded into the bigger parking area if we wanted to do the white trail there. 624 00:50:35,710 --> 00:50:40,990 There's also a very small amount of parking right up here off on the curve, but it's basically 625 00:50:40,990 --> 00:50:46,990 a wide spot on the curve, but there could be extra parking provided up in here pretty easily 626 00:50:46,990 --> 00:50:50,170 too for this high ground and one require a lot of fill. 627 00:50:51,070 --> 00:50:57,790 This one of my questions is if the red line is kind of where the existing is, and we're 628 00:50:57,790 --> 00:51:04,330 being asked to provide basically an entire new road for the town, 629 00:51:06,530 --> 00:51:11,650 would it be worthwhile pursuing 630 00:51:11,650 --> 00:51:21,490 looking at options for access to just totally eliminate using any of that area and purchase 631 00:51:21,490 --> 00:51:28,730 a right away to get over to 35, that's at a more suitable location somewhere in there. 632 00:51:29,170 --> 00:51:31,650 You've got a pretty large expansive area. 633 00:51:31,870 --> 00:51:38,350 I don't know the terrain or anything or how the costs would be, but if you're purchasing 634 00:51:38,350 --> 00:51:45,410 the right away, our road costs would go down substantially if it wasn't going all the way 635 00:51:45,410 --> 00:51:58,710 to the north east corner and it may be more cost conservative for the county to be able 636 00:51:58,710 --> 00:52:02,930 to just cut through and not have to purchase all bills all these new roads. 637 00:52:04,590 --> 00:52:11,470 So the issue that we would have is this is all town of St. Joe Road from my malls here all 638 00:52:11,470 --> 00:52:17,150 up so anytime that we're going to cross that portion of the road I'm sure the talent is going to 639 00:52:17,150 --> 00:52:23,930 still want that MOU for it now there is the possibility that we could talk to a property owner 640 00:52:23,930 --> 00:52:30,370 appear and maybe have the road entrance extend farther north however we don't know if there 641 00:52:30,370 --> 00:52:36,790 would be enough separation out on new highway 35 between the old highway 35 access and our new 642 00:52:36,790 --> 00:52:43,990 access to whether or not they would allow that. So, but that would be another opportunity that we could explore. 643 00:52:46,170 --> 00:52:52,130 I could jump into, I think the question we have for you is, where's the priority? 644 00:52:53,230 --> 00:52:56,330 So with the first dollars that we're going to spend, you want us to start on trails. 645 00:52:56,730 --> 00:53:01,550 Do you want us to start on the access to the park, which one is the priority for you? 646 00:53:01,590 --> 00:53:06,290 There's several different ideas that we can look through talking to St. Joe recently. 647 00:53:06,290 --> 00:53:10,310 the trying to get as much out of it as they can get out of it, which, you know, I don't blame 648 00:53:10,310 --> 00:53:14,390 them, I would have done the same thing. But being on the other side of the table, we want to 649 00:53:14,390 --> 00:53:20,230 give them as little as possible. So the question then is, where's the priorities? Is it, is it 650 00:53:20,230 --> 00:53:26,230 roads in access, parking lots? Is it the trails? Where do you want to spend the first dollar? 651 00:53:31,180 --> 00:53:39,800 I think you have to do an access point for sure, and then trail option beyond that. 652 00:53:39,800 --> 00:53:48,660 But the towns that have access through the, that is in the township of St. Joe, correct? 653 00:53:49,000 --> 00:53:49,220 Yeah. 654 00:53:49,920 --> 00:53:55,780 So was there any discussion on that access road to them? 655 00:53:56,020 --> 00:54:00,520 Or is that technically a private drive through there off of old 35? 656 00:54:01,920 --> 00:54:08,680 So that road here, the town was concerned about us removing the portion from the curve here, 657 00:54:08,680 --> 00:54:15,180 the old highway 35. So they were pretty, you know, uneasy, I guess, in that once they heard 658 00:54:15,180 --> 00:54:21,920 in that that we were going to leave that B because I think a bunch of their people in that 659 00:54:21,920 --> 00:54:26,900 that are back on the river there had expressed concerns about that portion of the road being removed. 660 00:54:27,200 --> 00:54:32,100 And we would just sign it very clearly so that everybody knew as a private drive and that our 661 00:54:32,100 --> 00:54:38,280 park users wouldn't use it to or from the park. We've had those residents in a couple of different 662 00:54:38,280 --> 00:54:43,540 times, they've always wanted that world left the way it is that's their access back to their 663 00:54:43,540 --> 00:54:49,280 houses and the park entrance to be a separate entrance. So ideally there's two entrances 664 00:54:49,280 --> 00:54:52,400 there, one for the park users and one for the private residences. 665 00:54:54,900 --> 00:54:56,140 Yeah, supervisor Bansomir. 666 00:54:57,080 --> 00:55:00,720 Well, and that's what I was thinking. I think it would make sense. Why don't we first 667 00:55:00,720 --> 00:55:04,260 well talk to the town of Hudson instead of the town of St. Joel, if we can come into that 668 00:55:04,260 --> 00:55:11,600 corner and leave that road and maybe connect with the farther in, but let them have that section 669 00:55:11,600 --> 00:55:15,400 of road which is kind of a scenic section of the road if we have ever driven in there. 670 00:55:15,620 --> 00:55:20,180 But maybe we come from the corner and go straight around so we can still connect with the 671 00:55:20,180 --> 00:55:26,800 trail to the cabin, the trail to our white trails and just let us say in Joe, do what they 672 00:55:26,800 --> 00:55:34,240 want to do, because it's a shorter distance from the town of Hudson and we own what's inside 673 00:55:34,240 --> 00:55:39,300 green lines so we could easily snap into that corner without a whole lot of issue. 674 00:55:39,740 --> 00:55:44,900 So you would say something Jerry about coming in at the corner here maybe coming over here 675 00:55:44,900 --> 00:55:49,020 hitting the edge of the prairie or something so that there wasn't a lot of tree removal 676 00:55:49,020 --> 00:55:54,200 cost and then kind of tying up to the parking lot. Something on that concept maybe I'm not 677 00:55:54,200 --> 00:56:01,040 exactly right. I agree with Ryan that we have to have an access point otherwise whatever 678 00:56:01,040 --> 00:56:04,760 build on the other side of the wall as useless. So you have to have an access point. So we have 679 00:56:04,760 --> 00:56:09,360 to start there. Okay, so that's the first question I have for you is where you want us to start. 680 00:56:09,600 --> 00:56:13,160 So we'll work through the different ideas. They'll come up with something on that. 681 00:56:13,500 --> 00:56:20,360 So I guess my understanding of this is we could like still have access through the road that's already 682 00:56:20,360 --> 00:56:27,320 there, right? It's not like, it's, yeah, it's not like you would have to walk there if we 683 00:56:27,320 --> 00:56:35,980 nothing with the access immediately. I understand the obvious visual concerns as far as when 684 00:56:35,980 --> 00:56:41,680 you're trying to get back on the highway. There's some safety issues with either of the two old 685 00:56:41,680 --> 00:56:46,720 35 access points but that's one of the other things that Jason I have talked about. Maybe we could 686 00:56:46,720 --> 00:56:54,900 just fix the intersections and not redo the whole road. The safety concerns have come up both 687 00:56:54,900 --> 00:57:02,400 If I'm correct me if I'm wrong, but the highway commissioner and the sheriff have expressed safety concerns with the traffic 688 00:57:03,100 --> 00:57:12,260 If we increase the traffic, I could either one of those junctions, but the north one is the less dangerous, the southern one is the more dangerous 689 00:57:12,260 --> 00:57:23,720 Probably it is right now, and the issue with both access is that you're coming up, grade like this, so you don't really see much either way on that for what's on the new highway 35 690 00:57:23,720 --> 00:57:29,820 and instead of coming in at a 90-degree corner where it's easy to see right and left 691 00:57:29,820 --> 00:57:35,680 you're coming in at 30-degree or 45-degree angle. You know in that so there's a lot 692 00:57:35,680 --> 00:57:40,760 of blind spots and there's a lot of sight concerns because it is on a slow curve there. 693 00:57:42,260 --> 00:57:47,860 I actually prefer the south entrance rather than the north entrance. I think yeah I think 694 00:57:47,860 --> 00:57:54,120 the south entrance would be easier to square off it looks like and we'd be doing a lot 695 00:57:54,120 --> 00:57:58,080 less with roads than as far as cutting them off or putting it in called the sacks or 696 00:57:58,080 --> 00:57:59,020 whatnot. 697 00:58:03,030 --> 00:58:13,040 Yeah I guess putting in a better access without doing trails to me seems I mean 698 00:58:13,040 --> 00:58:19,740 maybe you limit how much of the trails you do but without doing any just seems kind of doesn't 699 00:58:19,740 --> 00:58:22,280 so much of a purpose, I suppose, in my mind. 700 00:58:22,440 --> 00:58:24,740 Yes, what we've talked about was, you know, 701 00:58:24,860 --> 00:58:26,540 trying to do like a million dollars a year, 702 00:58:26,620 --> 00:58:28,380 but the first year may be doing 2 million, 703 00:58:28,860 --> 00:58:33,360 so we would do access and then one of the first easiest trails. 704 00:58:34,560 --> 00:58:38,520 So the second question I have for you is 2 million dollars 705 00:58:39,020 --> 00:58:41,080 is going to require a bond issue. 706 00:58:41,560 --> 00:58:43,600 I have a bond issue because the highway shop 707 00:58:43,600 --> 00:58:44,900 is going to be next year anyways. 708 00:58:45,500 --> 00:58:47,780 So it'd be easy enough to add 2 million on to that, 709 00:58:47,780 --> 00:58:51,260 But if I add a part project on the bond issue, 710 00:58:51,580 --> 00:58:55,080 am I going to get 15 county board supervisors to approve it? 711 00:59:02,860 --> 00:59:04,160 The only way to know is stride. 712 00:59:06,980 --> 00:59:14,700 I mean, I guess you can always push the part project 713 00:59:14,700 --> 00:59:16,080 down to the bond issue. 714 00:59:17,100 --> 00:59:20,440 And if someone doesn't want to bond $2.5 million 715 00:59:20,440 --> 00:59:23,080 or $2 million for a part project, 716 00:59:23,480 --> 00:59:25,660 they want to do $1.5 million. 717 00:59:25,660 --> 00:59:29,780 all of a deal with my family dollars and my strals, I guess, is what it is. 718 00:59:32,440 --> 00:59:37,880 I guess our thought process, you know, and that, what the access, we don't know of any grant funds 719 00:59:37,880 --> 00:59:42,640 that are available to build in that access. There might be, you know, some grant funds for building 720 00:59:42,640 --> 00:59:48,100 a parking lot down the road, but there might be, well, there might be, there would be significant 721 00:59:48,100 --> 00:59:53,620 cost savings by having our county highway department do the work. And if they're already there, 722 00:59:53,620 --> 00:59:59,980 They're probably going to end up having to find a barrel site caused by for fill and that if they go with that 723 01:00:00,000 --> 01:00:27,240 Or throughout, probably not as much on the south end, you know, but it just makes sense in that with that when they're engaged in that project that they kind of knock out the big infrastructure and then after that, we can apply for grants for the trails, we can do a lot of stuff just underneath our natural park budget, you know, for trail development and stuff out there and we can apply for grants for shower buildings and stuff, but there's just no grant money to get that access into there and have it be safe. 724 01:00:28,840 --> 01:00:29,920 Supervisor Shirley. 725 01:00:31,620 --> 01:00:38,500 So, can if we don't have it on the next year's, the next 2025 or 206 bond issue. 726 01:00:39,520 --> 01:00:43,180 So, I'm anticipating bond issues in 2025 and 2027. 727 01:00:43,960 --> 01:00:49,040 So, the bond issues in 25 would be primarily it's the Hudson Highway Shop, 728 01:00:49,540 --> 01:00:51,340 reconstructing that or building a new one. 729 01:00:51,600 --> 01:00:55,160 And then in 2027, we'd be looking at a jail expansion project, 730 01:00:55,160 --> 01:00:56,440 which would be substantial. 731 01:00:59,390 --> 01:01:05,690 In my opinion, I think that if the public safety referendum fails, 732 01:01:06,010 --> 01:01:10,730 we're going to have a hard time passing that in 2025. I think you'd be better off pushing that 733 01:01:10,730 --> 01:01:17,490 off to 2027 unfortunately, but I think that, like I said, I don't know that we would have a vote. 734 01:01:19,330 --> 01:01:23,390 Well, when the public safety referendum is approved then, you think it'll be fine? 735 01:01:28,310 --> 01:01:31,930 I think we need to, I think we need to, I think we need to just try it, 736 01:01:34,390 --> 01:01:34,870 because I think 737 01:01:34,870 --> 01:01:37,470 it would be a bit of discussion of the committee of the whole. 738 01:01:41,620 --> 01:01:42,560 Okay then. 739 01:01:42,960 --> 01:01:43,060 Okay. 740 01:01:43,520 --> 01:01:45,780 But I could be some guidance in that. 741 01:01:45,880 --> 01:01:49,660 I'll reach out to the town of Hudson, may contact with them. 742 01:01:49,780 --> 01:01:55,400 I'll talk with Greg Hague and Roby a little bit more about that self-access kind of what 743 01:01:55,400 --> 01:01:58,040 it's going to really take to make that a feasible project. 744 01:01:59,200 --> 01:02:07,970 And we'll look at those options and then hopefully we can have some better numbers for the April committee of the whole. 745 01:02:08,190 --> 01:02:10,570 Good. Any other conversation or questions? 746 01:02:12,970 --> 01:02:14,850 No, we're going to move on then. 747 01:02:15,530 --> 01:02:16,050 Thank you. 748 01:02:16,510 --> 01:02:16,830 The next. 749 01:02:18,370 --> 01:02:22,410 Next we're going to talk about email notification process and Jason, you might as well. 750 01:02:22,690 --> 01:02:23,770 All right. 751 01:02:23,770 --> 01:02:38,490 All right, so supervisor Conor had brought it up a few months ago now about notifying property owners when there's any zoning district change that may affect one of their properties or the uses of their properties. 752 01:02:39,690 --> 01:02:49,770 And so when we would talk about email list and that the county doesn't purchase email list like some of these other suppliers or vendors might do so that they just spam you with a bunch of junk mail. 753 01:02:49,770 --> 01:02:55,930 However, we do have a nice sign up for people that are concerned. 754 01:02:56,110 --> 01:03:00,890 It's called Notify Me. It's right here on a county website, very top. 755 01:03:01,510 --> 01:03:07,650 And so if I click on this, there's a couple different ones out there already. 756 01:03:09,630 --> 01:03:13,550 We've got two newsletters that are out there. 757 01:03:13,670 --> 01:03:18,970 And so people can take and enter their email address here. 758 01:03:18,970 --> 01:03:27,630 They go through just a couple quick processes, and then they can either get an email or a text message, and that with that 759 01:03:27,630 --> 01:03:35,130 News whatever it might be. So we could put public hearing notices out here, or we could take and have 760 01:03:35,130 --> 01:03:48,950 Ordnance amendments like chapter 13 or chapter 15. Hey, check all this proposed ordnance, and if you're 761 01:03:48,950 --> 01:03:58,370 ability to unsubscribe and that from this which is kind of the big deal is that we just can't buy that whole email list because then people don't have the ability to unsubscribe from it 762 01:03:58,370 --> 01:04:13,310 So this is an existing service that we could do we would just set it up with Adam and that whenever we have anything significant like ordinance amendments or any big towns owning changes 763 01:04:13,310 --> 01:04:22,350 we could put them in here, then anybody has on that list would take and be automatically sent to text or an email letting them know. 764 01:04:23,610 --> 01:04:26,650 So I'm kind of showing you what it looks like. 765 01:04:27,530 --> 01:04:33,110 So here with the Recycling Newsletter, we've went online. 766 01:04:33,850 --> 01:04:37,310 So this newsletter just went on, sorry, March 20th. 767 01:04:37,310 --> 01:04:46,570 If I go back, March 20th, 2024 at 10 a.m., so this is our new recycling news letter that's 768 01:04:46,570 --> 01:04:47,010 electronic. 769 01:04:48,290 --> 01:04:51,270 And so if you're assigned up for this one, you get this one. 770 01:04:51,370 --> 01:04:56,270 But if you're not concerned about recycling and you're concerned about the veterans office, 771 01:04:56,730 --> 01:05:01,030 you can subscribe to the veterans one and not get the recycling stuff. 772 01:05:01,370 --> 01:05:04,510 So you're able to select the content that you want to receive. 773 01:05:06,340 --> 01:05:13,240 So, if we created something in this portal, and that would kind of satisfy what you're wanting to do, 774 01:05:13,280 --> 01:05:14,460 supervisor Conor? 775 01:05:17,540 --> 01:05:25,980 I think it's a grand idea, but I don't think that that's going to put us where we want to be for what the problem is, 776 01:05:26,740 --> 01:05:31,200 because we're making an assumption that everybody's going to sign up for it in the county, 777 01:05:31,560 --> 01:05:33,860 and that they're all going to know that this even exists. 778 01:05:34,840 --> 01:05:41,980 I don't believe that you probably have the entire county that's signed up for the recycling one right now. 779 01:05:42,380 --> 01:05:47,160 I have, and I appreciate it, and it's a really good tool. 780 01:05:47,900 --> 01:05:54,240 And I think it's no matter what, I think that's a really good idea to move ahead with that, 781 01:05:54,520 --> 01:05:59,100 to be able to have those notifications out there, the more transparency, the better. 782 01:05:59,100 --> 01:06:16,100 But I still don't think it resolves the issue and you have large groups of people that have zoning changes brought on to them without having any idea that it's even going on. 783 01:06:18,000 --> 01:06:23,040 Because then again, you're making an assumption that everybody in the county knows to sign up for this. 784 01:06:25,150 --> 01:06:26,930 Yeah, supervisor Anderson? 785 01:06:27,610 --> 01:06:31,310 Just to echo, I guess, supervisor Connor was saying it. 786 01:06:31,370 --> 01:06:35,330 It really doesn't solve the problem by itself. 787 01:06:35,670 --> 01:06:39,550 And I don't even know that it would exactly... 788 01:06:39,550 --> 01:06:42,190 Trying to combine them, we're like, if you're on this one, 789 01:06:42,290 --> 01:06:43,750 we don't need to send you a mailers. 790 01:06:44,810 --> 01:06:47,610 I guess, fair, either, because... 791 01:06:47,610 --> 01:06:50,390 Adric, people sell them by house all the time, right? 792 01:06:50,990 --> 01:06:53,810 So, I definitely agree that it's worth doing. 793 01:06:53,810 --> 01:06:58,950 And I just don't know that it would prevent or preclude or should preclude us from sending 794 01:06:58,950 --> 01:07:00,870 out the mail notifications also. 795 01:07:02,530 --> 01:07:07,390 That's one of the problems you hit right on and that with having a email list is people 796 01:07:07,390 --> 01:07:09,570 are buying and selling properties all the time. 797 01:07:09,930 --> 01:07:15,410 So that's the positive thing about something like this is if they unsubscribe themselves, they're 798 01:07:15,410 --> 01:07:19,430 kind of managing that database for us and it's not like staff has to go through and keep 799 01:07:19,430 --> 01:07:21,470 it up to date. 800 01:07:21,470 --> 01:07:48,030 I like the system and how it works, if I've been on different ones for a long time, but are we able or legally able to have a separate flyer or something that goes with or property tax statements to property owners? 801 01:07:48,570 --> 01:07:50,210 Is that something we can put in there? 802 01:07:50,890 --> 01:07:57,470 You're going to have a tax bill, stuff her added to the tax bills, yes, if we go with all the tax bills. 803 01:07:58,770 --> 01:08:13,110 So I see this working well if we use it as a PR project and have like a QR code or something on it that it goes out or it's on more things that we're trying to build this list. 804 01:08:13,110 --> 01:08:21,490 And it's going to be a secondary notification because not everybody's going to get it and we all realize that, but the more that you can bolster it, the better it is. 805 01:08:24,540 --> 01:08:29,780 I think it's going to take a time for this to build, but I think in the future you will see this is where we'll be. 806 01:08:30,320 --> 01:08:37,880 And that's why we have to push onward until then I guess we'll have to do what we have to do, but I think this is very important. 807 01:08:40,780 --> 01:08:41,980 Anybody else? 808 01:08:41,980 --> 01:08:45,620 Then I'm going to jump in. 809 01:08:47,810 --> 01:08:53,470 This doesn't preclude a postcard notification if there's a dramatic rezoning. 810 01:08:54,870 --> 01:09:03,410 We can always add a postcard if something comes up, this really big, or will affect a pocket, 811 01:09:04,330 --> 01:09:09,990 you get a big area and then there's one hot zone that, whoa, those people are really going 812 01:09:09,990 --> 01:09:10,450 to get slammed. 813 01:09:10,450 --> 01:09:14,210 And we could, you know, as a committee, look at that and say, hey, we should send those folks. 814 01:09:14,570 --> 01:09:19,610 You know, there's not a reason that the committee can't make a policy short term one time, 815 01:09:19,610 --> 01:09:23,110 you know, hey, let's send them, you know, and the staff can always bring that up. 816 01:09:23,110 --> 01:09:27,510 Look at this, guys, you should, you should consider doing this and the staff can do that on their own too. 817 01:09:27,610 --> 01:09:30,270 They have the, that's an operational decision and a tweener. 818 01:09:31,470 --> 01:09:37,050 So I, I'm going to offer my opinion, I'm going to agree with you guys that maybe electronically, 819 01:09:37,050 --> 01:09:43,230 send out a notification in the tax statement, but you guys are here in that, right? 820 01:09:45,350 --> 01:09:50,690 And just continue to tell people, this is a great opportunity for you to stay in contact 821 01:09:50,690 --> 01:09:58,690 with your county through the tax statement, a paper noticed that you can be in contact electronically. 822 01:10:00,010 --> 01:10:03,990 So bring the Neanderthals to the monitoring, it's a great idea. 823 01:10:04,690 --> 01:10:12,930 I would need that, so do you need it, you don't need a vote on this just a kind of a little bit of conversation, right? 824 01:10:13,070 --> 01:10:14,770 Yeah, we're just sharing it with you. 825 01:10:14,890 --> 01:10:20,170 It might take on it as this is a great extra feature, but it's not replacing any legal notice requirements. 826 01:10:21,630 --> 01:10:22,970 Okay, this is above and beyond. 827 01:10:23,210 --> 01:10:26,210 All that being the case, we're going to move on to the next business item. 828 01:10:27,130 --> 01:10:35,600 Consideration of amendments to the 2024 community development fee schedule and JSON will take over here. 829 01:10:36,300 --> 01:10:40,160 So, I'm finding it here. There's 830 01:10:43,740 --> 01:10:52,040 just a couple of changes that we would like to do because we've found them after you guys approved the fee schedule as fall. 831 01:10:53,980 --> 01:10:55,180 What's that? 832 01:10:55,180 --> 01:10:56,000 Oh, sorry. 833 01:11:00,020 --> 01:11:02,100 So the changes here are in red. 834 01:11:03,220 --> 01:11:05,920 And so currently when somebody comes to our office 835 01:11:05,920 --> 01:11:07,200 and applies for a permit, 836 01:11:08,080 --> 01:11:10,200 and that we have to be taken collect their fee, 837 01:11:10,520 --> 01:11:11,800 be a checker credit card, 838 01:11:12,920 --> 01:11:14,460 and unfortunately we were charged 839 01:11:14,460 --> 01:11:17,700 that credit card processing fee right up front. 840 01:11:18,040 --> 01:11:20,880 And I'd like to tell you that it's a 2% charge, 841 01:11:21,060 --> 01:11:22,240 or it's a 3% charge, 842 01:11:22,240 --> 01:11:29,480 The reality is it bounces anywhere from 1% in 3 quarters all the way up to 3 and a half percent and that depending on the amount 843 01:11:29,480 --> 01:11:35,680 And so plus we have our time and that for doing the refund finance 844 01:11:35,680 --> 01:11:42,080 So we'd like to just take an insert, so that's very transparent, very clear up front that if you pay for 845 01:11:42,080 --> 01:11:49,420 Permit or something and you change your mind, of course if it's on our end or if there's nothing needed then we're going to refund the full amount 846 01:11:49,420 --> 01:11:54,480 But if it's on their end, like they don't want to move forward with the project anymore, 847 01:11:54,680 --> 01:12:00,920 they would be required to pay that 5% of the original permit fee amount, just so that we're not losing. 848 01:12:01,980 --> 01:12:07,280 So it really doesn't sound like a lot, but on a $400 permit, it's about $20 a pop. 849 01:12:07,420 --> 01:12:09,660 You know, that there were losing every time. 850 01:12:09,660 --> 01:12:26,760 So yeah, a lot of it, when we're where kind of comes in is and part stuff too, but we've got a separate cancellation fee, you know, but I mean, there is quite a few cancellations going back and forth because people changing their plans. So okay, 851 01:12:30,690 --> 01:12:43,290 the next fee is in regards to our sanitary program, and we don't have this in the original fee schedule, because since then we've obtained agent status through the state and 852 01:12:43,310 --> 01:12:51,390 And what agent status means is that now in-house, the Coney can review mounds at grades, pressurized 853 01:12:51,390 --> 01:12:57,750 system, stuff that would normally require state-of-proof plans, peer, and so people will 854 01:12:57,750 --> 01:13:03,330 be able to apply to the Coney and have a kind of a one-stop shopping experience because they 855 01:13:03,330 --> 01:13:07,550 can get their plan review and they can get their sanitary permit, all in one shot. 856 01:13:08,470 --> 01:13:12,850 Right now, the state is running what two to three weeks, I'm getting their review done. 857 01:13:12,850 --> 01:13:16,030 And then if they submitted to us, we'd have that extra 2 to 3 weeks. 858 01:13:16,470 --> 01:13:20,250 We should be able to shave off 2 to 3 weeks for that. 859 01:13:20,590 --> 01:13:22,270 We set the fee here at $400. 860 01:13:22,750 --> 01:13:26,110 Normally the state plan review fee is $250. 861 01:13:27,150 --> 01:13:29,850 However, if you want an expedited review, it's $400. 862 01:13:30,950 --> 01:13:32,550 So that's kind of where we had thought. 863 01:13:32,890 --> 01:13:38,090 And as far as staff time, that's where we really figured that we're going to have in it for our staff. 864 01:13:38,090 --> 01:13:46,310 Now, this is only for normal single family houses up to 1,000 gallons per day, which is basically 865 01:13:46,310 --> 01:13:47,730 a six-bedroom house. 866 01:13:48,170 --> 01:13:52,610 Any commercial systems would still require a state of plan approval. 867 01:13:53,270 --> 01:13:58,250 I just don't feel like we've got the staff capacity or the desire to get into some of those 868 01:13:58,250 --> 01:14:03,490 more complicated systems because they require a lot of on-site, you know, a time-dolicing 869 01:14:03,490 --> 01:14:10,810 duplex pumps, it's quite a commitment to take and jump into that world. Whereas these generally 870 01:14:10,810 --> 01:14:15,930 they're very standardized, the same plumber puts in the same three-bedroom mound that's 871 01:14:15,930 --> 01:14:25,450 a six by 75 foot mound, and that uses those same plans over so there's a lot of easy permitting 872 01:14:25,450 --> 01:14:27,530 process that can be done with this. 873 01:14:30,120 --> 01:14:36,670 And then the last changes were with the parks, and 874 01:14:36,670 --> 01:14:47,170 We had a little oversight with the wording, the Vista Prairie was originally set up as a group 875 01:14:47,170 --> 01:14:53,090 camp, and that's how we promoted it, but we've also got whispering Oaks, which is the 876 01:14:53,090 --> 01:14:58,990 land that's kind of south of there, and that's also our group camping area, and so it didn't 877 01:14:58,990 --> 01:14:59,970 make sense to take. 878 01:15:00,000 --> 01:15:28,180 And have one called group camping and the other one not. So it made a lot of sense just to take a make of a rate for group campground. We still kept the 501C3 rate in there at half the amount. And we should be good there. So we are also making improvements to the, the vista prairie campground by extending the pads so that they can figure units in there and putting in water. 879 01:15:28,180 --> 01:15:34,260 And we're using that because right now in the past year or so it hasn't been filling up. 880 01:15:34,600 --> 01:15:38,840 So we're trying to get more individual users out there too, just to use that part of the park. 881 01:15:43,400 --> 01:15:47,020 So I'll need as a consensus from the committee that you're okay with these fees. 882 01:15:47,760 --> 01:15:53,420 Kevin, gravy, would be the one helping us out with the sanitary plan reviews. 883 01:15:54,180 --> 01:15:57,060 So that should be a positive thing. Yeah, supervisor Shirley. 884 01:15:57,760 --> 01:16:05,560 just a quick question on the septic review. Is that is the state forwarding all of 885 01:16:05,560 --> 01:16:09,780 those or does the homeowner have the option to send to the state or send it to the 886 01:16:09,780 --> 01:16:14,820 company? They have the option to do either one. Okay. So there's a large number of 887 01:16:15,620 --> 01:16:21,820 moms and aunt grades within the county and so if we did take on all of them, that would 888 01:16:21,820 --> 01:16:25,600 be quite a time commitment from staff and we probably don't have the ability to do 889 01:16:25,600 --> 01:16:30,960 that but there's a lot of times in that where maybe it is an emergency install and they're 890 01:16:30,960 --> 01:16:35,300 willing to pay the 100 and a half more to get it done right away. That's what it's really 891 01:16:35,300 --> 01:16:42,720 designed for. Okay, so at this time we have any further questions or I would entertain a motion 892 01:16:42,720 --> 01:16:47,240 to accept these changes. I'll make a motion mix up the fee. Let's get some changes. 893 01:16:47,240 --> 01:16:57,240 Alright, moving to second. All in favor, say aye. Aye. Aye. Any opposed? Motion passes. Let's move on to business item. Number eight. 894 01:16:58,520 --> 01:17:03,320 Discussion on amenix eight correct County chapter 15 zoning ordinance. This will be John Hillgers. 895 01:17:14,540 --> 01:17:19,200 So this next item was raised by the committee. I think it was about two or three meetings ago. 896 01:17:19,720 --> 01:17:22,720 We had talked about some of our egg entertainment standards. 897 01:17:22,720 --> 01:17:27,920 And this kind of stems back to a rezoning request we had last summer if you recall in the 898 01:17:27,920 --> 01:17:28,820 Tone of Kinakinic. 899 01:17:29,640 --> 01:17:34,300 We kind of updated the committee back then about what the standards were for egg entertainment 900 01:17:34,300 --> 01:17:37,540 but at that time we didn't pursue any amendments. 901 01:17:37,780 --> 01:17:40,280 We didn't really get the direction to do so. 902 01:17:40,620 --> 01:17:44,580 So we're kind of bringing it back at the request of the committee from a couple meetings ago. 903 01:17:45,340 --> 01:17:51,400 In the meantime, our staff has also met with local town officials about some common zoning 904 01:17:51,400 --> 01:17:58,380 violations and some other items, such as the use of saw mills, different contract or storage 905 01:17:58,380 --> 01:17:58,880 yards. 906 01:17:59,420 --> 01:18:04,220 So if we're talking about a zoning amendment to egg entertainment, we'd also like to 907 01:18:04,220 --> 01:18:09,460 keep this in context that maybe we can revisit some of these other categories and standards. 908 01:18:10,220 --> 01:18:17,780 But as a refresher for the committee, with respect to our egg entertainment uses, we'll just 909 01:18:17,780 --> 01:18:20,020 talk about the authority and standards, 910 01:18:22,200 --> 01:18:24,920 right now the county has two agricultural zoning districts 911 01:18:24,920 --> 01:18:30,400 egg one and egg two. Both of these zoning districts need the criteria for the state farm 912 01:18:30,400 --> 01:18:35,740 land preservation zoning districts under the farm land preservation Wisconsin statutes. 913 01:18:36,300 --> 01:18:41,420 And this allows participating tones to allow their residents to claim that income tax 914 01:18:41,420 --> 01:18:43,360 rebate on their tax farms. 915 01:18:43,480 --> 01:18:45,380 And right now, we have, I believe, 916 01:18:45,540 --> 01:18:49,220 that seven participating tones that are in that program. 917 01:18:50,260 --> 01:18:52,200 The farmland preservation zoning districts 918 01:18:52,200 --> 01:18:54,880 must be approved and certified by DadCAP. 919 01:18:55,620 --> 01:18:58,480 And again, landowners are able to participate 920 01:18:58,480 --> 01:19:01,360 by claiming tax credits on their income taxes. 921 01:19:02,640 --> 01:19:04,160 Now, being in this program, 922 01:19:04,660 --> 01:19:08,060 the county is required to allow specific uses 923 01:19:08,060 --> 01:19:15,280 under statute 9144 either as permitted or conditional uses. So we have the list of 924 01:19:15,280 --> 01:19:20,640 egg uses, farm residences, and then I highlighted in yellow the category that we believe 925 01:19:20,640 --> 01:19:27,820 the egg entertainment standards fall under. Accessory uses are allowed including any activity 926 01:19:27,820 --> 01:19:34,380 or business that is an integral part of an egg use, or a business whether or not as associated 927 01:19:34,380 --> 01:19:39,520 with an egg use or not that is conducted by the owner of the farm and employees no more than 928 01:19:39,520 --> 01:19:45,120 four full-time employees and does not impair the current egg uses and then the list goes on 929 01:19:45,120 --> 01:19:54,160 to list other varying uses. Below you see a map of our participating towns, everything with a cross-hatch, 930 01:19:54,820 --> 01:19:58,740 our participants in the farmland preservation program. 931 01:20:02,100 --> 01:20:05,240 We'll quickly as these provisions were adopted 932 01:20:05,240 --> 01:20:12,520 back in 2012, the Coney defined egg entertainment under four broad categories. These are 933 01:20:12,520 --> 01:20:17,880 foreign-based enterprises or businesses that combine the elements of egg entertainment and 934 01:20:17,880 --> 01:20:25,900 tourism. They include outdoor recreation, educational experiences, entertainment and hospitality 935 01:20:25,900 --> 01:20:31,500 services, and then under each yellow category we kind of provide some examples that are within 936 01:20:31,500 --> 01:20:41,180 code, I won't go into detail, but the hospitality services fall under the wettings overnight 937 01:20:41,180 --> 01:20:42,700 farm and ranch stays. 938 01:20:45,460 --> 01:20:49,480 Under our current categories, and again, we did not change the standards 939 01:20:49,480 --> 01:20:56,120 when we went and revisited the zoning code in 2019 through our comprehensive revision. So the 940 01:20:56,120 --> 01:21:01,680 standards I'm going to read off are the standards that have been in place since 2012. And the egg 941 01:21:01,680 --> 01:21:09,540 One in eight two districts, the egg entertainment is allowed as a permitted use if you do not exceed 15 calendar days per year. 942 01:21:10,260 --> 01:21:16,340 So if you stay under 15, there's no conditional use permit review or standard of review. 943 01:21:17,360 --> 01:21:21,980 Again, if activities exceed 15 calendar days, a conditional use permit is required. 944 01:21:23,540 --> 01:21:31,180 Regardless of the number of days, whether you're at 15 or below that, any activity exceeding 945 01:21:31,180 --> 01:21:38,020 100 persons during a 24 hour period has to submit an event plan through our staff that has 946 01:21:38,020 --> 01:21:43,020 then reviewed a land use permit is issued to address parking days and hours of operation, 947 01:21:43,020 --> 01:21:49,980 an ingressy gross sanitation science solid waste management. That event plan is then filed with 948 01:21:49,980 --> 01:21:54,320 the tone clerk emergency responders and the local fire district. 949 01:21:57,310 --> 01:21:58,090 Again, as I mentioned, 950 01:21:58,310 --> 01:22:02,350 these standards have been in place since 2012. They were not amended during the 951 01:22:02,350 --> 01:22:09,630 composition of 2017 to 2019. Interestingly, one of the themes we heard during our 2019 952 01:22:09,630 --> 01:22:15,750 comprehensive zone in revision is that the county shouldn't able egg entertainment uses 953 01:22:15,750 --> 01:22:22,310 in moral locations. So we had to create a zoning district outside of the egg one and egg two 954 01:22:22,310 --> 01:22:28,550 districts so we created the commercial C2 district which is very specific in that it allows 955 01:22:28,550 --> 01:22:32,450 egg entertainment uses outside of the egg districts. 956 01:22:34,760 --> 01:22:40,960 This zoning must be consistent with the local 957 01:22:40,960 --> 01:22:47,620 has reviewed and approved two rezoning applications that have been filed for the C2 zoning districts. 958 01:22:48,020 --> 01:22:50,900 One was in the Tone of Kinne-Kinne-Kinne-Kinne-Kinne, and the other one was in the Tone of 959 01:22:50,900 --> 01:22:51,120 Silent. 960 01:22:53,780 --> 01:22:58,640 So really based on our view of statute and our view of the code, there are a number of 961 01:22:58,640 --> 01:23:04,340 things that the committee could modify should you so choose, and that would be the number of events 962 01:23:04,340 --> 01:23:08,440 that would trigger a conditionally-use permit requirement. Now, I think we had that discussion 963 01:23:08,440 --> 01:23:15,240 during that rezoning application with Kinnikenic, the question was why is it 15 events that would 964 01:23:15,240 --> 01:23:21,480 have to occur before the CUP is triggered? Again, that was the threshold that was established back in 2012. 965 01:23:22,400 --> 01:23:28,060 The other thing the committee could do is modify the event plan requirements. The one thing we 966 01:23:28,060 --> 01:23:34,180 believe that is not possible is that it would not be possible to remove the egg entertainment uses 967 01:23:34,180 --> 01:23:39,620 as it meets the intent of the statutes, as we described earlier, as far as what a property owner 968 01:23:39,620 --> 01:23:45,620 is allowed to do under farmland preservation. Unless we as the county no longer wanted to 969 01:23:45,620 --> 01:23:51,380 participate in that program, but based on the number of tone ships that participate, there are quite 970 01:23:51,380 --> 01:23:59,260 a few benefactors under the farmland preservation plan program. So again, the committee can go back and 971 01:23:59,260 --> 01:24:04,160 revisit the standards, you know, to determine the number of events that would trigger a CUP 972 01:24:04,180 --> 01:24:11,700 We can modify the event plan requirements, but basically that is the extent of what we feel you could modify. 973 01:24:16,680 --> 01:24:16,860 All right. 974 01:24:17,220 --> 01:24:18,820 So who wants to go first? 975 01:24:22,150 --> 01:24:29,890 I don't think we should change anything. 976 01:24:32,240 --> 01:24:33,200 That's my time. 977 01:24:42,160 --> 01:24:56,920 As far as the A2, a question in the 15-day limit, I think it depends more on what they're actually 978 01:24:56,920 --> 01:25:03,060 doing and considering a cultural entertainment, there's such a wide variety if you're talking 979 01:25:03,060 --> 01:25:09,260 about weddings or barndances, it's one thing, but if they're talking about something more hospitality 980 01:25:09,260 --> 01:25:14,360 your educational and you're really going to make them do a conditional use permit if they're 981 01:25:14,360 --> 01:25:17,180 doing education for kids in the farm. That doesn't make a lot of sense. 982 01:25:19,680 --> 01:25:20,120 So I don't know 983 01:25:20,120 --> 01:25:25,720 how to separate that out, but that's my one common at least on the egg too stuff. 984 01:25:29,230 --> 01:25:36,130 Well, I agree with Mr. Shirley that the 15-day thing I think is quite exorbitant because 985 01:25:36,130 --> 01:25:42,430 as someone brought up at one of our deals that we're dealing with, that's every weekend 986 01:25:42,430 --> 01:25:49,250 of the summer, and the people who don't want these next to them should have some time 987 01:25:49,250 --> 01:25:49,910 off from that. 988 01:25:50,130 --> 01:25:52,270 The neighborhood should have some time off of that. 989 01:25:52,270 --> 01:25:55,790 So I think we do have to change that part, for sure. 990 01:25:55,890 --> 01:25:57,350 I think that's too aggressive. 991 01:26:01,290 --> 01:26:07,470 I also think that one thing that we've left out is hearing the neighbors, and I'm not sure 992 01:26:07,470 --> 01:26:08,390 exactly how to do that. 993 01:26:08,390 --> 01:26:17,390 But those people who live next to them that want no part of this, but are told they can't 994 01:26:17,390 --> 01:26:17,730 do anything. 995 01:26:18,150 --> 01:26:19,570 We don't make any changes on that. 996 01:26:19,570 --> 01:26:21,530 That's something also that we need to address. 997 01:26:22,830 --> 01:26:26,250 They have as much right to not have that in their neighborhood as the person who wants to 998 01:26:26,250 --> 01:26:28,050 put it in has to have that in their neighborhood. 999 01:26:28,990 --> 01:26:38,050 So maybe one of the things, if we cut that 15 days down to 7, anything over that they 1000 01:26:38,050 --> 01:26:38,670 Right. 1001 01:26:39,410 --> 01:26:42,250 I think that would satisfy a lot of people. 1002 01:26:42,590 --> 01:26:47,110 But then I think we all have to come up with some plan for listening to the area that 1003 01:26:47,110 --> 01:26:47,450 they're able to. 1004 01:26:54,830 --> 01:26:58,970 Another thought on that would be, especially in some of those that we've looked at this 1005 01:26:58,970 --> 01:27:06,270 last year, if we have somebody looking at moving to an egg to zoning, that's a budding, 1006 01:27:06,470 --> 01:27:13,790 an R2 or an R1, trying to define where those egg tos are and I'm not exactly sure what 1007 01:27:13,790 --> 01:27:20,670 answer is at this moment but you know some of those the zoning for the egg 1008 01:27:20,670 --> 01:27:25,970 two makes more sense in a surrounded by egg than it does surrounded by an hour 1009 01:27:25,970 --> 01:27:27,270 one or an hour or 1010 01:27:37,730 --> 01:27:41,130 two yeah listening everything or what he's bringing in and 1011 01:27:41,130 --> 01:27:46,510 all and they're making good points that maybe there's some things that we need 1012 01:27:48,170 --> 01:27:50,470 address before we move forward. 1013 01:27:52,150 --> 01:27:54,150 My thought is that 1014 01:27:56,870 --> 01:27:58,070 you guys are both right. 1015 01:27:58,410 --> 01:28:02,130 But the thing is, the zoning part is zoning. 1016 01:28:02,290 --> 01:28:04,110 There's a lot of things that zoning is for, 1017 01:28:04,130 --> 01:28:06,910 but part of it is to make sure that your rights are, 1018 01:28:07,470 --> 01:28:11,710 you have the right to enjoy your property in the manner that you 1019 01:28:12,190 --> 01:28:14,230 expected to when you purchased it. 1020 01:28:15,330 --> 01:28:17,710 So the people who live around the property, 1021 01:28:17,710 --> 01:28:26,710 expected to enjoy the property a certain way, and now somebody buys the property in the middle of all that and decided to have a party. 1022 01:28:27,670 --> 01:28:39,170 But only if you resultant for me, and so so now, I think it's personally, and this is why I'm glad that Jerry wanted to have this conversation. 1023 01:28:39,170 --> 01:28:50,930 And the conditional use permitting process is a way to put that under a microscope. 1024 01:28:51,870 --> 01:28:57,630 And then this committee doesn't do it quickly, and not that we would do it quickly, but 1025 01:28:57,630 --> 01:29:00,670 it gives the conditional use permitting process, right? 1026 01:29:01,090 --> 01:29:04,290 The BOA will really focus on that. 1027 01:29:04,290 --> 01:29:12,410 And there are quasi-judicial board and they have an opportunity to go through a quasi-judicial process, 1028 01:29:12,630 --> 01:29:13,950 something that we don't. 1029 01:29:14,930 --> 01:29:19,150 And I think we've reduced the number of days. 1030 01:29:20,050 --> 01:29:23,750 That this 15 days we bring it down like Jerry's suggestion of seven. 1031 01:29:24,350 --> 01:29:28,590 And if it's a mild use, you know, they're going to have educational functions or whatever. 1032 01:29:29,570 --> 01:29:31,090 They shouldn't have any problem whatsoever. 1033 01:29:31,090 --> 01:29:38,590 And if it's out in the country and they're having weddings, they shouldn't have any problem whatsoever, or if it's in the middle of a somewhat residential area 1034 01:29:38,590 --> 01:29:46,510 Then it needs to have some more scrutiny, but it's not for us to say because it'll be a conditional use. It's not this committee's previous at that point and that I think it's a good compromise 1035 01:29:46,510 --> 01:29:51,970 It's my opinion. I guess I could get I guess I could get talked into 12 seven scenes 1036 01:29:52,430 --> 01:29:54,510 Like one a month seven scenes of stream 1037 01:30:01,330 --> 01:30:06,910 I think it should be less than that because I think the people around all the stuff that's going 1038 01:30:06,910 --> 01:30:12,830 on deserve more time off that they deserve as much as much time off as the other people deserve 1039 01:30:12,830 --> 01:30:19,030 on. Why would you say one or there? Here's the other thing that if I can put up what John 1040 01:30:19,030 --> 01:30:25,110 has on the screen there on the right side, third one down, if an activity exceeds 100 people during 1041 01:30:25,110 --> 01:30:29,870 a 24-hour period. Well, let's take the guy with the winery down and Kenny Connect, he's not 1042 01:30:29,870 --> 01:30:35,530 going to know that he's going to have 100 people there before the 100 people there, so he's not 1043 01:30:35,530 --> 01:30:43,350 going to do that, is he? And so we have to look at that also and keep that in mind as we 1044 01:30:43,350 --> 01:30:49,410 have to make this decision because that's an after-the-fact thing. I'm not exactly certain 1045 01:30:49,410 --> 01:30:53,450 how to do that one, but that is something that needs to be considered also. Thank you. 1046 01:30:55,050 --> 01:31:01,570 Mr. Chair, can I throw in two cents, so what I'm hearing from you guys is that you'd like 1047 01:31:01,570 --> 01:31:07,250 to have a process that had good due process and your conditional use permit is your way 1048 01:31:07,250 --> 01:31:14,510 to do that. Unfortunately there is fees on that for that permitting process, but then you 1049 01:31:14,510 --> 01:31:19,530 can look at each situation where supervisor Hanson was mentioning here individually. I think 1050 01:31:19,530 --> 01:31:26,910 the event plan, that is supposed to be prior or before the event is happening because we're 1051 01:31:26,910 --> 01:31:33,330 trying to really notify our EMS and our vocal fire departments and stuff, hey, you've 1052 01:31:33,330 --> 01:31:40,910 got an event going on there. So I'll leave it up to you guys, but I'm getting the idea that 1053 01:31:40,910 --> 01:31:46,110 you're open to opening this up and at least having further conversation about reducing the 1054 01:31:46,110 --> 01:31:52,430 number of days. The 15 days is completely arbitrary. You guys can make it one, you know, you 1055 01:31:52,430 --> 01:31:57,310 can make it two, whatever, and that you see fit for that type of use. 1056 01:32:03,340 --> 01:32:10,420 I guess if we could maybe be a little more specific to on what doesn't require a conditional 1057 01:32:10,420 --> 01:32:17,500 use permit or maybe has that a different number for certain things, like if it's strictly 1058 01:32:18,020 --> 01:32:28,670 Farmline and Preservation Education, maybe you're limited to 30 days before you need a CUP or 20 before you need a CUP, and then if it's, you know, events, I guess. 1059 01:32:30,000 --> 01:32:32,340 Non-educational events of any kind. 1060 01:32:34,160 --> 01:32:35,340 We could discuss the law. 1061 01:32:35,580 --> 01:32:37,700 I hope you don't mind. Chair is going to jump in conversation. 1062 01:32:39,380 --> 01:32:40,960 Noise, I think, is the issue. 1063 01:32:41,880 --> 01:32:50,560 So you're thinking like a matrix of the different uses, and then within the matrix we have different thresholds that would trip the CUP requirement. 1064 01:32:51,360 --> 01:32:51,420 Yeah. 1065 01:32:51,420 --> 01:32:51,720 Yeah. 1066 01:32:53,680 --> 01:33:00,300 I think we just need further definition of what for one. 1067 01:33:01,220 --> 01:33:06,640 I think everybody knows I'm not a huge fan of CUPs anyway, but what trips that in there. 1068 01:33:06,640 --> 01:33:18,940 And then a secondary, maybe a process of how staff would look at the placement of AIG2 in relation to what's around it. 1069 01:33:19,280 --> 01:33:22,000 You know, we always have the question of spot zoning and whatever. 1070 01:33:23,380 --> 01:33:27,680 But maybe we look into that a little bit more detailed of what's around there. 1071 01:33:28,080 --> 01:33:31,100 And a lot of that falls back on the comprehensive plans. 1072 01:33:31,220 --> 01:33:35,080 They have a future land use and we rely on that heavily to make our recommendations. 1073 01:33:35,080 --> 01:33:38,280 So, you know, that is a big factor we look at now. 1074 01:33:39,060 --> 01:33:41,540 The other thing I'd like to maybe just share with the committee. 1075 01:33:42,860 --> 01:33:47,240 The number of inquiries we've gotten for egg entertainment uses have dropped considerably. 1076 01:33:48,000 --> 01:33:50,900 Since last fall there was a new state while that was implemented. 1077 01:33:51,600 --> 01:33:55,840 That puts more of the burden on the property owner to secure liquor licenses. 1078 01:33:57,480 --> 01:34:01,220 That went into effect I believe in November of last year. 1079 01:34:01,220 --> 01:34:06,880 And that would require anybody owning property where they want to do wedding burns with alcohol sales. 1080 01:34:07,140 --> 01:34:12,540 If you're going to have five or more of those events per year, the property owner is responsible for getting. 1081 01:34:12,920 --> 01:34:16,320 Not only the liquor license, but the insurance that goes with that. 1082 01:34:16,560 --> 01:34:21,160 So I had one call from a current egg entertainment wedding burn operator. 1083 01:34:21,460 --> 01:34:24,900 And they said that's just been a serious challenge for them. 1084 01:34:24,900 --> 01:34:38,300 the initial license fee is a $10,000 fee and a yearly renewal fee and then I didn't get a number on the insurance, but it seemed based on my conversation that was a significant expense. 1085 01:34:39,180 --> 01:34:49,380 So once that law passed, we are myself in the zoning staff noticed a reduction in the number of inquiries. I think that's kind of a hindrance. 1086 01:34:51,240 --> 01:34:59,000 Part of the discussion is property owner rights and if you're changing zoning and it's not 1087 01:34:59,000 --> 01:35:04,720 truly spot zoning but if you're changing zoning for one piece of property is near 1088 01:35:04,720 --> 01:35:11,580 other property and it's going to affect if either perception and that's always hard to maintain 1089 01:35:11,580 --> 01:35:22,200 manage, but the or in reality, the way that those people really enjoy or use their property, 1090 01:35:23,100 --> 01:35:31,460 then whose rights are more our responsibility to the serve. 1091 01:35:33,160 --> 01:35:34,760 And that becomes a question. 1092 01:35:35,420 --> 01:35:40,000 And is it our obligation to resale in that property in the law of the way that we've written 1093 01:35:40,000 --> 01:35:43,860 And it says, yes, we have to reason on the property because it's 15 days. 1094 01:35:45,040 --> 01:35:52,160 So that becomes the challenge for me and why do I think we should consider reducing that 1095 01:35:52,160 --> 01:35:58,560 is so that we have more of an opportunity to look at that and not be painting ourselves 1096 01:35:58,560 --> 01:35:59,380 into the corner. 1097 01:36:00,700 --> 01:36:01,060 So, Jerry. 1098 01:36:02,000 --> 01:36:08,080 The question for John, John, that liquor licensing does that include BIOB events or not? 1099 01:36:08,080 --> 01:36:14,300 are people still free to bring whatever alcohol they want on onto the site onto the premises. 1100 01:36:14,680 --> 01:36:20,840 You know? I'm not sure about that. I'd have to get slicker sales. It's liquor sales. It's selling 1101 01:36:20,840 --> 01:36:21,460 of alcohol. 1102 01:36:30,250 --> 01:36:35,750 So let's talk, let's just, I'm still not sure what we're asking John for. What do 1103 01:36:35,750 --> 01:36:40,450 we want to see and what we consider as a committee. And again, we're looking at an external 1104 01:36:40,450 --> 01:36:44,710 we might be a different group of people here, so should we ask them to just wait until next 1105 01:36:44,710 --> 01:36:46,130 term and revisit this? 1106 01:36:47,790 --> 01:36:54,310 I mean, I'm betting most of this committee, if not all, we'll be here again, just based 1107 01:36:54,310 --> 01:37:01,630 on the fact that the nomination forms have turned in, I guess, put that way. 1108 01:37:05,970 --> 01:37:12,930 I don't think we'd be jumping the gun at all to, I guess, the kind of gig guidance now, 1109 01:37:13,130 --> 01:37:23,910 just based on realities, let's be prudent about it, I'm open, I said, I can be open 1110 01:37:23,910 --> 01:37:29,410 to reducing, I guess, events, I don't, I don't think I'd be comfortable with as little 1111 01:37:29,410 --> 01:37:30,010 is 7, 1112 01:37:32,160 --> 01:37:37,120 that's more palatable, but cutting it in more than half is kind of seems after the 1113 01:37:37,120 --> 01:37:48,240 fact seems a little bit improved into me and then but yeah I like the matrix idea for stuff 1114 01:37:48,240 --> 01:37:53,840 that would be easily proved by bother making them pay to go through a conditional use pyramid. 1115 01:37:56,400 --> 01:38:00,380 John has been taking notes up there I would have quite comprehensively so I think that we're 1116 01:38:00,380 --> 01:38:05,640 talking about this, not why don't we allow the staff to do some work on this and see what 1117 01:38:05,640 --> 01:38:07,980 they can come up with and come back at another meeting. 1118 01:38:08,440 --> 01:38:11,460 Yes, we may not all be here, but we may all be here doing. 1119 01:38:11,740 --> 01:38:15,460 And even if we're not all here, we have to keep moving on this. 1120 01:38:15,460 --> 01:38:16,960 The world doesn't stop if we are here. 1121 01:38:18,200 --> 01:38:18,940 Thank you. 1122 01:38:20,200 --> 01:38:24,620 Mr. Chair, if I could just ask the question, in the cover memo, we talk about some of the 1123 01:38:24,620 --> 01:38:31,120 their zoning issues that have been brought up by various tone officials and then some of 1124 01:38:31,120 --> 01:38:35,900 the encounters our staff has had regarding some of these other uses and Jason maybe 1125 01:38:35,900 --> 01:38:41,400 you can put some context to this but we've had some issues with some else mixed uses. 1126 01:38:41,660 --> 01:38:47,400 I believe in some of the Amish settlements part of the county contract or storage yards, 1127 01:38:47,400 --> 01:38:49,000 phone-based businesses? 1128 01:38:51,260 --> 01:38:57,880 I guess so I can provide some context here. In the last six 1129 01:38:57,880 --> 01:39:02,860 months that I've been here we've had a lot of common violations that keep 1130 01:39:02,860 --> 01:39:07,420 recurring. It just doesn't seem like our ordinance fits in and so while it's 1131 01:39:07,420 --> 01:39:11,780 not our job to take and create policy it is our job to let you know when our 1132 01:39:11,780 --> 01:39:17,180 policies really don't align with a large portion of the community or you know 1133 01:39:17,180 --> 01:39:19,980 communities that were seeing repeated violations for. 1134 01:39:20,720 --> 01:39:23,480 And so about three weeks ago, we met with 1135 01:39:23,480 --> 01:39:25,120 town officials from the town of Baldwin, 1136 01:39:25,660 --> 01:39:28,580 Oguelie, Springfield, and Katie. 1137 01:39:29,540 --> 01:39:31,600 And those officials brought to our attention 1138 01:39:31,600 --> 01:39:35,300 several violations that the Amish have with 1139 01:39:35,300 --> 01:39:40,680 some else small general stores for basically their people, 1140 01:39:40,760 --> 01:39:42,180 but also open to the public. 1141 01:39:42,780 --> 01:39:45,520 And also the Amish community, 1142 01:39:45,520 --> 01:39:51,820 Generally they have two different dwellings, you know, on that on that their property and so 1143 01:39:51,820 --> 01:39:57,980 There becomes a lot of issues and basically all three of those standards don't comply with our current ordinance 1144 01:39:57,980 --> 01:40:05,420 Now normally if it was just one property owner or one violation, you know, and that you probably don't have a problem with your ordinance 1145 01:40:06,160 --> 01:40:10,540 So but when we got a whole bunch of them and that just seemed like it was very repetitive 1146 01:40:10,540 --> 01:40:17,760 So we asked the towns, you know, and that what are we going to do to take and get some oversight and the 1147 01:40:17,760 --> 01:40:24,320 towns were supportive of zoning ordinance amendment. I'm just going to use saw mills for an example 1148 01:40:24,320 --> 01:40:28,380 where they would be able to have some conditions in some oversight because 1149 01:40:30,200 --> 01:40:37,440 this fall or winter has been really unique, you know, in that our roadbands went on very early, 1150 01:40:37,440 --> 01:40:46,120 But they had some semi-traffic on their town roads, bringing in walks to the saw mills, and that didn't sit very well with the towns. 1151 01:40:47,120 --> 01:40:56,380 So we could go with this past Monday, Mike Wozniak, our land use administrator myself went on to Freeman Miller's property, and that is in the town of Galilee, 1152 01:40:56,780 --> 01:41:05,360 and he had a general store and he had a saw mill that our office shut down, and also another dwelling on the property. 1153 01:41:05,360 --> 01:41:07,200 He was one of our violation sites. 1154 01:41:07,800 --> 01:41:10,380 And we basically waited out on the table and we were like, 1155 01:41:10,720 --> 01:41:13,340 hey, you know, that our tunnel officials are really pushing. 1156 01:41:14,060 --> 01:41:17,900 And we've got an ordinance and we're going to enforce the ordinance. 1157 01:41:19,060 --> 01:41:21,440 But there's other issues when it comes to the building 1158 01:41:21,440 --> 01:41:24,000 coincide that the Amish are having as well. 1159 01:41:24,480 --> 01:41:26,540 And so I'm like, your whole community, 1160 01:41:26,980 --> 01:41:29,040 we want to work with you as much as possible. 1161 01:41:29,520 --> 01:41:30,880 But yet we've got our ordinances 1162 01:41:30,880 --> 01:41:33,260 and we need to take and work with our talents too. 1163 01:41:33,260 --> 01:41:39,080 So, had a good hour and a half long conversation, basically at the end of the conversation, 1164 01:41:39,480 --> 01:41:44,320 he's like, well, let me talk to some of the other members in our community and we'll see about 1165 01:41:44,320 --> 01:41:49,340 if we can get everybody together, building court officials included, town officials included 1166 01:41:49,340 --> 01:41:52,360 in one spot and meet about this. 1167 01:41:52,420 --> 01:42:00,280 And so, he did call me on Monday, and that I didn't answer, but so there's a little communication 1168 01:42:00,280 --> 01:42:06,520 challenges there but he did relate that he talked to the bishop and some other 1169 01:42:06,520 --> 01:42:10,740 founding fathers and they are willing to sit on and meet. I think there's 1170 01:42:11,740 --> 01:42:16,260 potentially a good way to comply. I'm like we're not going to pitch this at the 1171 01:42:16,260 --> 01:42:20,320 county and the towns if you guys are going to continue to take and violate. We 1172 01:42:20,320 --> 01:42:24,000 need to have a two-way partnership here and make sure that you guys are willing 1173 01:42:24,000 --> 01:42:28,900 to comply but if there's some common ground where we have a CUP that maybe has 1174 01:42:28,900 --> 01:42:36,060 truck traffic conditions and sawdust maintenance or management conditions to it maybe there is a win-win. 1175 01:42:36,340 --> 01:42:40,780 For like a sawmill right now that's only allowed with a conditionally used in the industrial 1176 01:42:41,780 --> 01:42:48,260 this is owning. So you can see that a town is not going to want to take and have an i1 in the middle of 1177 01:42:48,260 --> 01:42:53,100 their town just because of a sawmill. So basically prohibits it from being able to be done. 1178 01:42:54,240 --> 01:43:00,440 Contractor storage yard, we currently have that defined as only outside storage, but yet we've 1179 01:43:00,440 --> 01:43:04,700 got a lot of contractors in that that are trying to put their equipment inside and that 1180 01:43:04,700 --> 01:43:09,400 when they're at home, which I think, you know, doesn't have nearly the impact as outside 1181 01:43:09,940 --> 01:43:14,920 storage would be, you know, but they don't really fit our ordinance either, so we're always 1182 01:43:14,920 --> 01:43:19,560 having a hard time trying to fit them in common sense, it seems like, hey, if you can put 1183 01:43:19,560 --> 01:43:24,980 inside, out of sight, out of mind. That's a better thing. So that would be potentially 1184 01:43:25,800 --> 01:43:32,920 travel trailers. We could maybe refine our provisions that what we allow, what we 1185 01:43:32,920 --> 01:43:38,340 don't allow, and then home base businesses, there's a lot of requirements in there about 1186 01:43:38,340 --> 01:43:44,440 how much of the home base business could be used for that particular type of use. So I don't know 1187 01:43:44,440 --> 01:43:49,540 what the committee's take is, but if we're going to open it up for egg, and that for the 1188 01:43:49,540 --> 01:43:55,460 So, we're biting barns and stuff, it might make sense to open up for the chapter 15. 1189 01:44:01,180 --> 01:44:05,380 Yeah, just, yeah, but for opening it, let's get it all in one shot. 1190 01:44:08,620 --> 01:44:09,040 I agree. 1191 01:44:09,180 --> 01:44:15,480 I mean, I have a laundry list of issues that we have with chapter 15 from our last go around 1192 01:44:15,480 --> 01:44:16,320 on there. 1193 01:44:16,480 --> 01:44:21,440 But, yeah, we need to take a closer look at it once or twice. 1194 01:44:21,440 --> 01:44:24,300 Are you thinking of work session or do you want to bring something to the committee? 1195 01:44:24,860 --> 01:44:34,400 So, and that right now, it's actually a pretty nice deal because we basically got two months before we meet again here as a committee, so that gives us time to create a draft. 1196 01:44:34,900 --> 01:44:44,220 And as soon as we have that draft done, we could maybe have a first review at the main meeting and then you guys could determine whether or not you wanted to have another meeting on it. 1197 01:44:44,220 --> 01:44:59,960 I would have think that this would not be a comprehensive amendment, this would be only a minor amendment because we wouldn't be adding any zoning districts or classifications like egg one or egg two, and that we're going to stay within the existing boundaries that we're going to do. 1198 01:45:00,000 --> 01:45:06,620 We've got and just modify some of the performance provisions, definitions and CUP requirements. 1199 01:45:07,660 --> 01:45:11,220 So we have two thoughts concerning the main meeting. It's going to be a huge meeting. 1200 01:45:12,340 --> 01:45:15,060 And you will not have gotten any sleep by there. 1201 01:45:15,400 --> 01:45:16,120 I'll be fine. 1202 01:45:19,100 --> 01:45:21,060 Okay. So any other thought? 1203 01:45:22,600 --> 01:45:23,860 All right. Let's move on. 1204 01:45:25,840 --> 01:45:27,920 Discussion on chapter 13. 1205 01:45:28,520 --> 01:45:29,260 And that'll be Jason. 1206 01:45:40,750 --> 01:45:46,870 Hang on, let's take a two-and-a-half minute break. Everybody just hang on. 1207 01:45:46,870 --> 01:45:49,050 Three, three, three. 1208 01:45:49,410 --> 01:45:49,810 No, no. 1209 01:45:50,050 --> 01:45:51,570 There's 180 seconds. 1210 01:45:52,550 --> 01:45:53,130 We're taking a break. 1211 01:46:02,060 --> 01:46:07,060 Our land use staff, our planning staff, everybody can basically, within community development 1212 01:46:07,060 --> 01:46:09,160 has been able to review this document. 1213 01:46:10,140 --> 01:46:17,040 And so there's numerous changes that are really just removing duplicate of text 1214 01:46:17,040 --> 01:46:23,300 And we're also trying to clarify what the Platt's submittal would have. 1215 01:46:23,680 --> 01:46:27,660 Right now there's a lot of information that is included on the face of the Platt. 1216 01:46:27,880 --> 01:46:35,780 We've had several waivers here for road setbacks, and that we basically was an implication 1217 01:46:35,780 --> 01:46:39,640 because we required too much information on the Platt a while ago. 1218 01:46:40,420 --> 01:46:45,940 So keeping the Platt very simple and clean so that when it's filed with a register of deeds, 1219 01:46:45,940 --> 01:46:51,600 we don't have to go back with all these waivers and amendments to the plat, but yet then also 1220 01:46:52,280 --> 01:46:58,220 still retaining that information in the additional submittals, so the supporting documentation 1221 01:46:58,220 --> 01:47:05,900 if you will when they complete the plat. So I'd like to just go through the main policy changes 1222 01:47:06,500 --> 01:47:12,620 and we're not advocating for these, but I'll kind of give just a short brief reason why you might 1223 01:47:12,620 --> 01:47:14,620 want to consider some of these changes. 1224 01:47:15,220 --> 01:47:18,300 The first one is with our survey required, right? 1225 01:47:18,300 --> 01:47:24,740 Now the ordinance references that if you keep your parcels over 35 acres in size, that 1226 01:47:24,740 --> 01:47:32,100 you do not need a survey, and so somebody that owns 240s side by side could come in there 1227 01:47:32,100 --> 01:47:35,720 and maybe there's a farm field on that, that goes on both 40s. 1228 01:47:36,120 --> 01:47:42,140 They could literally try to create a meets and bounds description to follow the wood line, and 1229 01:47:42,140 --> 01:47:46,940 You might end up with something really, really jagged like this and you know, I mean some 1230 01:47:46,940 --> 01:47:51,720 mounds that's as page one because they don't need a survey just because they keep both 1231 01:47:51,720 --> 01:47:58,400 parcels over 35 acres, you know, and so that provision doesn't come into effect a lot 1232 01:47:58,400 --> 01:48:04,640 because you need both parcels to be over that amount, but this here would basically mean 1233 01:48:04,640 --> 01:48:11,200 that any parcel that's being subdivided would require certified survey map. 1234 01:48:11,200 --> 01:48:14,100 And so the remnant would also be required. 1235 01:48:14,240 --> 01:48:17,200 So if you had a 40 acre parcel and you chunk 1236 01:48:17,200 --> 01:48:21,080 all one or two, you know, two acre lots of of it, 1237 01:48:21,380 --> 01:48:24,240 you would have a lot, one, a lot, two, 1238 01:48:24,280 --> 01:48:26,820 and then the remnant would be your lot, three of the map. 1239 01:48:28,360 --> 01:48:32,840 Now, usually, in that or 99% of the time, 1240 01:48:33,020 --> 01:48:35,620 the surveyers already got to go and find the other corners 1241 01:48:35,620 --> 01:48:39,100 and that when they're splitting off those other parcels. 1242 01:48:39,880 --> 01:48:43,620 So it's not like they're really having to do a lot of extra work. 1243 01:48:44,080 --> 01:48:49,480 It's just that they're including it on the map and then it creates a lot of easier processes 1244 01:48:49,480 --> 01:48:56,340 down the road because when ROD files it, it's a lot one of CSM number blank and also you get 1245 01:48:56,340 --> 01:49:04,280 like one sentence and that verse is having a whole page and when property analysis have to 1246 01:49:04,280 --> 01:49:06,000 put it into the tax roll. 1247 01:49:06,000 --> 01:49:09,180 It's very simple and the assessors are dealing with it 1248 01:49:09,180 --> 01:49:11,420 when properties are being bought and sold. 1249 01:49:12,100 --> 01:49:14,640 A very short abbreviated meets and bones. 1250 01:49:16,180 --> 01:49:17,920 So any questions on that one? 1251 01:49:18,780 --> 01:49:18,800 Okay. 1252 01:49:19,840 --> 01:49:23,080 The concept review is throughout the whole document. 1253 01:49:24,280 --> 01:49:26,660 I would consider this a preliminary review 1254 01:49:26,660 --> 01:49:30,000 for the preliminary plan or the preliminary plan. 1255 01:49:30,500 --> 01:49:33,160 And so I'm not sure a concept review 1256 01:49:33,160 --> 01:49:39,480 is a correct wording, our staff, and including Corey would like to take an offer courtesy 1257 01:49:39,480 --> 01:49:40,100 reviews. 1258 01:49:40,620 --> 01:49:45,300 So if somebody's got a draft and they want to send it in and say, hey, is there going 1259 01:49:45,300 --> 01:49:46,620 to be any issues with this? 1260 01:49:46,780 --> 01:49:47,940 We're still open to that. 1261 01:49:48,240 --> 01:49:53,720 I just don't know if we need to be as formal to have a preliminary review before the preliminary 1262 01:49:53,720 --> 01:49:55,560 plan, before the final plan. 1263 01:49:56,080 --> 01:50:00,980 So there's nothing in the statute that requires us to have that. 1264 01:50:00,980 --> 01:50:07,340 So again, similar concept could still be offered, no fees attached, just a courtesy. 1265 01:50:09,970 --> 01:50:11,030 So, road provisions. 1266 01:50:11,210 --> 01:50:13,770 So there was a lot of road provisions in the ordinance. 1267 01:50:14,490 --> 01:50:20,670 There was a court case in Rock County that token basically came out and said that public 1268 01:50:20,670 --> 01:50:25,990 improvements are to be specced by the local municipality. 1269 01:50:26,570 --> 01:50:31,830 So be the towns in our case, they're the ones that can require what the width of the 1270 01:50:31,830 --> 01:50:39,110 would be how much pavement they want on it, any drainage easements, utility easements, what the 1271 01:50:39,110 --> 01:50:46,430 county can require is more the stuff for the order we wale. So, in other words, we can say that a 1272 01:50:46,430 --> 01:50:52,770 road has to be, you know, plated or maybe has to continue to the other property line for future road 1273 01:50:52,770 --> 01:50:58,370 development so that at all connects, we just can't get into the weeds as far as what the specs are 1274 01:50:58,370 --> 01:51:04,050 of those provisions. Now, if this amendment was to go into place, we would definitely want to 1275 01:51:04,050 --> 01:51:09,150 do some outreach to make sure that the towns know that we're no longer reviewing those and to 1276 01:51:09,150 --> 01:51:15,070 make sure that they have their standards in place. There are some standard town-rolled specs 1277 01:51:15,070 --> 01:51:21,030 in chapter 82, I believe, of the Wisconsin statutes that will really cover a lot of this. 1278 01:51:21,510 --> 01:51:26,830 Just want to make sure that they would be aware of it. Again, this here is only the first review 1279 01:51:26,830 --> 01:51:32,090 this ordinance so it's still require a public hearing. We would have to file a petition with 1280 01:51:32,090 --> 01:51:36,890 the county quirk. We could do a public hearing in May or June and it could be into the 1281 01:51:36,890 --> 01:51:42,050 county board if you wanted to in June or July depending on how much review time you want. 1282 01:51:44,150 --> 01:51:52,250 We just finished up the comprehensive plan update and as part of this survey requirement of that 1283 01:51:52,250 --> 01:52:00,550 plan update was like 90% of the residents of the colony wanted to preserve the real 1284 01:52:00,550 --> 01:52:07,350 character of the colony and preserve the agricultural around and there is a lot of 1285 01:52:07,350 --> 01:52:13,230 provisions in the conservation design that are very duplicative and there may 1286 01:52:13,230 --> 01:52:17,370 be a setback of a hundred feet but then right below what they say that that hundred 1287 01:52:17,370 --> 01:52:25,210 what setback can be reduced by up to 50% if you meet this X, Y, and it's just a lot of 1288 01:52:25,210 --> 01:52:33,770 gray area. So being that the towns and their town complex designate so much of the land 1289 01:52:33,770 --> 01:52:41,530 to be developed, maybe R2 zoning, conservation design is a good tool for the colony to offer 1290 01:52:41,530 --> 01:52:44,310 to preserve the rural character, but you 1291 01:52:44,310 --> 01:52:47,430 still meet the housing needs of the county. 1292 01:52:48,190 --> 01:52:50,110 And so with the conservation design, 1293 01:52:50,530 --> 01:52:53,630 there's a 25% density increase. 1294 01:52:54,070 --> 01:52:55,750 So if you had a parcel that you could really 1295 01:52:55,750 --> 01:53:01,350 only put eight hoses on, and a conventional major plat, 1296 01:53:01,870 --> 01:53:03,890 now you do conservation design, 1297 01:53:04,130 --> 01:53:07,430 you're able to reduce the lot sizes down to half acre, 1298 01:53:07,850 --> 01:53:11,310 and you get 25% increase or roughly 10 1299 01:53:11,310 --> 01:53:18,370 blowing units out of that same parcel. We don't have many of these. I think I was going 1300 01:53:18,370 --> 01:53:23,610 one or two in the whole county right now because a developer looks at the ordinance 1301 01:53:23,610 --> 01:53:30,230 is like, oh, it's like 10 pages long. You know, and I think the center of land use education 1302 01:53:30,230 --> 01:53:35,710 or UW extension probably came up with the current text that we've got because it is very common 1303 01:53:35,710 --> 01:53:40,650 amongst the counties, it's kind of standard, if you will. 1304 01:53:41,930 --> 01:53:50,410 So the proposal has a lot of simplification and conservation design to try to promote conservation 1305 01:53:50,410 --> 01:53:54,710 design within the colony, if that's something that the committee wants to support. 1306 01:53:55,170 --> 01:54:00,510 And one of the main things that they ran into a lot of problems with was that Mona Openspace 1307 01:54:00,510 --> 01:54:07,430 requirement going from 50%, we dropped that to 40%, it could even be less if you want, but 1308 01:54:07,430 --> 01:54:13,830 basically if you've got 100 acres right now, the ordinance would require 50 acres to remain 1309 01:54:13,830 --> 01:54:21,730 open space, and we would drop that to 40 acres of open space. We think it'll be more attainable. 1310 01:54:25,570 --> 01:54:29,210 So, as a comment, did you have one on the last one on the road provisions? Sorry. 1311 01:54:31,000 --> 01:54:41,900 I guess on both of these, I do. On the road provision, one of the concerns I get being a former 1312 01:54:41,900 --> 01:54:44,080 town board person, 1313 01:54:46,260 --> 01:54:53,440 the town board has been very reliant on review for roads and construction 1314 01:54:53,440 --> 01:55:00,260 and everything and reliant on the county and they go through the process for review with 1315 01:55:00,260 --> 01:55:11,040 county highway department and most of them do have a spec, but by doing what you're talking about it kind of makes me 1316 01:55:11,040 --> 01:55:20,460 concerned that it's going to force them now to also hire in engineering services and everything to do reviews and have 1317 01:55:20,460 --> 01:55:23,700 additional costs and additional layers. 1318 01:55:25,240 --> 01:55:35,660 So right now a lot of this we rely for the role reviews and all this stuff to be done under our administrative fees and everything. 1319 01:55:35,940 --> 01:55:48,600 It was incorporated in and it was more streamlined because we're just dealing with the county to do this and if we're taking the county out of this now and we're going to put all the burden on to the town that 1320 01:55:48,600 --> 01:55:54,740 Hey, you're going to enforce your roads and how they're constructed and how they're done and the lay-outs 1321 01:55:55,360 --> 01:56:05,360 We're going to be pretty much pushing that they're going to have to hire in engineering services and we're going to add another layer of cost on to developers and everything else in there 1322 01:56:05,780 --> 01:56:12,180 So I'm just thinking out loud here about I realized the rock connie case, but 1323 01:56:12,180 --> 01:56:18,580 Is there a way that we can have a mutual agreement with the towns or another way to do this? 1324 01:56:18,600 --> 01:56:24,280 so that we can avoid the legal side of it but yet be able to do what we've been doing. 1325 01:56:24,920 --> 01:56:29,640 So that question has been asked and that unfortunately the talents can not delegate their 1326 01:56:29,640 --> 01:56:34,480 review authority to the colony and so that's where and that I'm not happy with the rock 1327 01:56:34,480 --> 01:56:39,720 colony case either but literally we would have no enforcement authority to say hey we want that to 1328 01:56:39,720 --> 01:56:46,580 be a 23 foot black top pavement road versus the standard 22 we could not require that as a colony 1329 01:56:46,580 --> 01:56:54,720 the town could. And so that's where our outreach needs to be very good. We can take the plan pages 1330 01:56:54,720 --> 01:57:00,140 that we had to cut out. Here's all of our specs. And we can take and give them to the town. 1331 01:57:00,960 --> 01:57:05,700 And then they can require the developer to show how they're going to meet it. So I don't think 1332 01:57:05,700 --> 01:57:13,580 they have to go as far as hiring outside services if they didn't want to. But really, this has 1333 01:57:13,580 --> 01:57:19,720 around since before 2018, and our office hasn't been reviewing it for the road specs. 1334 01:57:20,460 --> 01:57:25,340 So it's just a kind of a clean up thing. It's been more in the ordinance for a guidance document 1335 01:57:25,340 --> 01:57:30,860 for towns and people to look back to, just because it's one central location, but really they 1336 01:57:30,860 --> 01:57:36,460 should be going back to the statute of chapter 82. So yeah, supervisor Anderson. 1337 01:57:36,940 --> 01:57:42,760 I guess I don't see, you know, like you said any reason why they couldn't use the guidance, 1338 01:57:42,760 --> 01:57:48,160 the county used to follow as far as their own standard and then is there any reason the 1339 01:57:48,160 --> 01:57:56,340 township can't like for example I know it lose the fees but the township can't be the 1340 01:57:56,340 --> 01:58:00,580 kind of higher the county to do the review to see if it meets their own standard if that 1341 01:58:00,580 --> 01:58:05,900 makes sense. As far as the recommendation not ultimate authority but a recommendation. 1342 01:58:06,460 --> 01:58:11,620 Good ask Heather on that because I know that they can't just delegate their authority to 1343 01:58:11,620 --> 01:58:19,320 But if the town contracts with us to do their review are we then a contracted party like in 1344 01:58:19,320 --> 01:58:20,660 Engineering, so 1345 01:58:20,660 --> 01:58:23,600 Seems reasonable to me 1346 01:58:25,970 --> 01:58:34,250 Because then that's the town's decision to say these are the people doing the review for us and they're explicitly making that decision 1347 01:58:34,250 --> 01:58:39,110 Or if they can't if we can't do the review for them as a county staff 1348 01:58:39,110 --> 01:58:46,970 They can hire us as far as as far as the form of the decision they can hire us to give them a recommendation and 99% of the time 1349 01:58:46,970 --> 01:58:51,330 They just follow the recommendation problem. I don't see a problem with that 1350 01:58:51,330 --> 01:58:55,670 But that doesn't change the fact that we still need to clean up this ordinance. Absolutely. Yeah, absolutely 1351 01:58:56,490 --> 01:58:59,450 We can definitely use that as part of our follow-up with them 1352 01:58:59,450 --> 01:59:05,810 You know, and the memo is hey this is changing and that may be we offer a service similar to like what we do with the 1353 01:59:05,810 --> 01:59:09,330 plans in that that we help the talent with demanding their compliance. 1354 01:59:12,440 --> 01:59:12,960 I'm sure the highway 1355 01:59:12,960 --> 01:59:17,760 commissioner will have something to say about that as well. Yeah, and that Robbie's guidance 1356 01:59:18,220 --> 01:59:22,540 is looking to statute. He says it's all spec don't right there. That's what we should be following. 1357 01:59:23,240 --> 01:59:27,960 But not saying that that the statute answered every call to sack with and you know what I mean? 1358 01:59:28,080 --> 01:59:31,720 So there is design criteria that would be helpful for the tones. 1359 01:59:34,610 --> 01:59:35,170 So through all the 1360 01:59:35,170 --> 01:59:42,210 And then I'm just going to ask the second question, well, okay, so moving on to the conservation design. 1361 01:59:45,230 --> 01:59:51,210 I'm a very big advocate for conservation design is talking with you in the past, 1362 01:59:51,890 --> 01:59:59,850 but I think our biggest downfall with conservation design that we need to work on is how we're going to manage the... 1363 02:00:00,000 --> 02:00:07,860 Based water management issue is that's where the downfall is. When they install these systems, 1364 02:00:08,540 --> 02:00:15,400 it's the long-term management issue and how to do it. I don't believe it's a good practice 1365 02:00:15,400 --> 02:00:21,600 to leave that to homeowners associations because they can fall apart. They don't necessarily 1366 02:00:22,440 --> 02:00:28,700 plan them accordingly where they have sinking funds and things for replacement for the future. 1367 02:00:29,480 --> 02:00:36,500 I think there has to be a way, and it's going to involve somehow either inissapality or 1368 02:00:36,500 --> 02:00:39,620 another means that we have to do to do it. 1369 02:00:40,360 --> 02:00:47,620 But if we really want to make this happen, first we have to resolve how we're going to take 1370 02:00:47,620 --> 02:00:50,080 here the wastewater management issue. 1371 02:00:50,720 --> 02:00:56,460 So now the way I read it right now is that a common system would not be required, and that 1372 02:00:56,460 --> 02:01:02,220 It would be an option to have a common system, but if you had bigger watts that were suitable 1373 02:01:02,220 --> 02:01:07,520 for their own private sanitaries that they would be able to put them on there, and maybe 1374 02:01:07,520 --> 02:01:10,200 you just wanted to clarify that so that it's queer. 1375 02:01:11,120 --> 02:01:15,660 Yeah, because I think you need it and don't you need the state statutes at three quarters 1376 02:01:15,660 --> 02:01:19,380 of an acre for if you're going to have an individual system? 1377 02:01:19,820 --> 02:01:23,980 There's no required of it as long as it meets setbacks, you could have a corner acre wide 1378 02:01:23,980 --> 02:01:31,820 you could have a sewer on it so really I just understood that my I live on 1379 02:01:31,820 --> 02:01:37,760 under a quarter acre and it has its independent septic system. It's also 1380 02:01:37,760 --> 02:01:43,440 probably grandfathered in but it's you know you're not gonna stop if I needed 1381 02:01:43,440 --> 02:01:47,480 to replace my septic system like you can't really stop me from doing that I 1382 02:01:47,480 --> 02:01:52,760 guess I don't think we should and not just only personal experience or 1383 02:01:53,660 --> 02:01:56,900 obviously other people in the neighborhood that have each house has their own 1384 02:01:56,900 --> 02:02:00,920 septic system and we kind of tough to, I guess, pull the rug out. 1385 02:02:01,320 --> 02:02:06,260 Local back to septic, a couple of points down here so, because we've got some more. 1386 02:02:08,540 --> 02:02:11,460 So, again, Mike, what was the act? 1387 02:02:12,120 --> 02:02:13,980 Our Zoning Administrator, we had used Administrator, 1388 02:02:14,600 --> 02:02:16,200 was involved in this draft. 1389 02:02:16,720 --> 02:02:19,960 There was a lot of excess Zoning Administrator, 1390 02:02:19,960 --> 02:02:25,180 administrator, discretion, wrote into the ordinance. He's all in favor. I'm not trying to rob 1391 02:02:25,180 --> 02:02:35,120 Mike of his power. But unfortunately, that gray area, all the time, created every time that 1392 02:02:35,120 --> 02:02:39,680 our office gets some submittals. It's like, oh, what do we do? Do we apply it here? Do we 1393 02:02:39,680 --> 02:02:45,160 apply it there? You know, there was been some internal policies that have been put out to staff 1394 02:02:45,160 --> 02:02:50,540 and about what should be applied when, and that, and our goal is really, so that if they 1395 02:02:50,540 --> 02:02:56,700 can create a document that is on the website, any land owner, sub-divider, serve error, 1396 02:02:56,800 --> 02:03:00,080 can go out there, and they can read the requirements, and it's very clear. 1397 02:03:00,160 --> 02:03:03,740 This is what's saying Craig County's going to require, and this is the process that we're 1398 02:03:03,740 --> 02:03:05,140 going to have to do to do it. 1399 02:03:05,520 --> 02:03:09,720 So that's the goal of that provision, the policy, you bet. 1400 02:03:11,180 --> 02:03:18,440 As far as the zoning administrator, he still has to make rulings that could be brought to 1401 02:03:18,440 --> 02:03:25,640 BOA as a appeal, so we can't strip all that away. 1402 02:03:26,360 --> 02:03:29,100 No, this is a lot of the fluff for the discretion. 1403 02:03:34,560 --> 02:03:44,280 I'm very talked about keeping the face of the plaats queen, but just putting that in the 1404 02:03:44,280 --> 02:03:48,740 It was buildable area. That's the main thing. So that's the area with all the right 1405 02:03:48,740 --> 02:03:53,720 of ways, without the steep slopes, the wetlands. That's the main portion that we're concerned 1406 02:03:54,220 --> 02:04:00,280 about. What I mean by clarified is we defined what contiguous was. And that about having 1407 02:04:00,280 --> 02:04:08,100 a connection strip between the two chunks. I think we ended up with 16 feet. I think was what 1408 02:04:08,100 --> 02:04:12,820 we said it had to be a width to connect so that you don't have a one foot strip to connect. 1409 02:04:12,820 --> 02:04:15,860 So that's what I mean by clarifying. 1410 02:04:18,330 --> 02:04:20,830 There are several references in the ordinance 1411 02:04:20,830 --> 02:04:25,170 where it almost implies like the county is going to enforce 1412 02:04:25,170 --> 02:04:27,890 the easements, deed restrictions, 1413 02:04:28,450 --> 02:04:31,330 covenants and bylaws of some of these plats 1414 02:04:31,330 --> 02:04:36,170 and quite often we don't have any authority to do so. 1415 02:04:36,490 --> 02:04:38,670 With the ones that we have authority to enforce 1416 02:04:38,670 --> 02:04:42,050 or like conservation easements and a conservation design. 1417 02:04:42,050 --> 02:04:44,410 So, those provisions are all in there. 1418 02:04:44,530 --> 02:04:49,510 So, anything that sink or a county would be a part of, we would still be an enforcer of. 1419 02:04:49,930 --> 02:04:59,490 However, if there is a covenant that says your host has got to be hot pink, you know, we're not going to send out our way and you staff and tell somebody that they got to make their whole hot pink. 1420 02:04:59,970 --> 02:05:03,750 That would be up to the homeowner's association and that to do that. 1421 02:05:10,000 --> 02:05:13,280 So, back to the septic side. 1422 02:05:13,760 --> 02:05:25,280 Currently, every watt, within St. Croix County, when it's subdivided, requires a soil attest to be done on that watt to verify that it's suitable for a sanitary system. 1423 02:05:26,100 --> 02:05:26,500 Okay, fine. 1424 02:05:27,820 --> 02:05:36,100 The problem is, is that soil attest, you know, back in the day, we're 350 bucks or 400 bucks, it wasn't a big deal on the scheme with things. 1425 02:05:36,100 --> 02:05:40,580 now those are pushing six to seven hundred dollars and so we're getting fairly large 1426 02:05:40,580 --> 02:05:47,340 tracks of land that a farmer is buying or somebody that just wants it for hunting land is buying 1427 02:05:47,340 --> 02:05:51,900 and they're saying yeah we don't really care to do that soil attached we don't want to absorb 1428 02:05:51,900 --> 02:05:58,220 that cost I have no intention I'm building on that piece of property and so they're taking in 1429 02:05:58,220 --> 02:06:05,180 calling an outlot on the survey map when in reality that parcel meets the minimum lot size 1430 02:06:05,180 --> 02:06:10,260 requirements, it meets the contiguous notable area, it meets everything in the ordinance, but 1431 02:06:10,260 --> 02:06:13,760 it's being called that, oh, I just because they didn't want to pay for the soil attests. 1432 02:06:14,820 --> 02:06:20,540 And so we've also got existing parcels in the county that are maybe bulk of wetland, you 1433 02:06:20,540 --> 02:06:25,360 know, and they might not be able to meet the contiguous notable area on that whole parcel. 1434 02:06:25,940 --> 02:06:27,720 Do we really want to call it an old water? 1435 02:06:27,900 --> 02:06:30,420 Do we want to let them have it as is? 1436 02:06:30,700 --> 02:06:34,940 I don't know what the assessors do, but that's a question that kind of comes to my mind because 1437 02:06:34,940 --> 02:06:40,360 So if we got a big parcel that's deemed as an outlot, we would probably be assessing it 1438 02:06:40,360 --> 02:06:46,020 like it was an outlot and that they couldn't build any dwellings on that property or anything. 1439 02:06:47,200 --> 02:06:52,660 So it's just not really good order we development to be calling all these things outlots 1440 02:06:52,660 --> 02:06:57,520 when typically an outlot is a parcel that doesn't meet the ordinance requirements. 1441 02:06:58,260 --> 02:07:02,920 So maybe they don't meet the length of width because it's a road, it's a plated roadway 1442 02:07:02,920 --> 02:07:09,460 and it's only 66 feet wide, but it's 1,000 feet long, you know, those are the alt watts that are okay, 1443 02:07:09,580 --> 02:07:14,500 and those are the alt watts that we still want to continue to allow. It's just these bigger chunks just 1444 02:07:14,500 --> 02:07:21,500 because of the soil test. So, but yet if we have parcels that are being split into five acres or 1445 02:07:21,500 --> 02:07:26,500 less, or if they're part of a major plant, we know the intent of those parcels then is housing 1446 02:07:26,500 --> 02:07:34,400 development, so we took in our suggesting in the ordinance here that those are the watts 1447 02:07:34,400 --> 02:07:39,460 that we would require the soil test on. The ones that are, you know, smaller watts intended 1448 02:07:39,460 --> 02:07:44,100 for housing more than likely. Any questions on that one? 1449 02:07:50,060 --> 02:07:52,560 With that comes by or be where, you know, 1450 02:07:52,660 --> 02:07:57,900 and that when you buy a piece of property and it's 38, there's, you know, if you want to build on 1451 02:07:57,900 --> 02:08:02,500 there, you know, that somebody should be thinking, hey, I'm going to put it in the purchase order, 1452 02:08:02,640 --> 02:08:09,540 but I'm going to put it in on contingent that it has a perk that'll work for a sewer system. 1453 02:08:11,700 --> 02:08:11,700 So 1454 02:08:13,970 --> 02:08:20,690 is that something, if we make this change, we could notify like, I don't know, all of the, 1455 02:08:20,690 --> 02:08:27,370 I guess, real estate licensees in the county or something, or that generally work in the county, 1456 02:08:27,370 --> 02:08:36,330 that we probably have an email record of, or at least the major branches or whatever, just so that they root all of that, them are aware. 1457 02:08:37,130 --> 02:08:46,510 I mean, we could, but really, you know, for my own personal experience, don't be buys a lot without perk testing at first. 1458 02:08:48,070 --> 02:08:54,410 I mean, you'd be crazy to do so. So I'm buyer beware, but I mean, I think the buyer's probably already are. 1459 02:08:54,930 --> 02:08:57,070 I mean before you're going to spend that kind of money. 1460 02:08:58,770 --> 02:09:03,790 I mean, I think everywhere else you go, but it's just been past practice here that we 1461 02:09:03,790 --> 02:09:07,170 may be trying to protect the buyer too much. 1462 02:09:07,550 --> 02:09:12,450 And that a little bit, because as the time has came on, you know, on that we've changed 1463 02:09:12,450 --> 02:09:18,490 septic system designs, what's allowable, you know, so I mean, times change and we don't know 1464 02:09:18,490 --> 02:09:23,050 what the land is going to be either, you know, so somebody could go in there with a 1465 02:09:23,050 --> 02:09:30,310 and flatten it and it could make that soil test no longer valid too, you know, we would have nothing, you know, to know about it. 1466 02:09:33,900 --> 02:09:35,540 So, right. So, 1467 02:09:38,220 --> 02:09:45,130 okay, there was some provisions in far as the landscape standards that were in conflict with chapter 15. 1468 02:09:45,640 --> 02:09:50,920 So, we just made consistency through all of the document with definitions. 1469 02:09:52,020 --> 02:09:55,280 And like I said, various standards that they were the same. 1470 02:09:56,200 --> 02:10:00,380 Otherwise, it's confusing, which one are you supposed to follow? 1471 02:10:01,220 --> 02:10:05,000 Condense the ownership options for outlats and shared common open space. 1472 02:10:05,200 --> 02:10:10,280 There was provisions in there to allow like a third party conservation organization to own them. 1473 02:10:11,180 --> 02:10:15,800 But of course, we had concerns about tax deed, takebacks, property taxes. 1474 02:10:17,260 --> 02:10:22,140 You know, who was going to follow it through and make sure each party was doing everything that they should be? 1475 02:10:22,140 --> 02:10:28,220 So the one-third party that we would allow besides the developer and the county would be the town. 1476 02:10:28,720 --> 02:10:33,280 So which and that is kind of most of those public properties go. 1477 02:10:35,440 --> 02:10:40,220 We updated the agencies, ordinance, links, some middle requirements. 1478 02:10:42,400 --> 02:10:47,540 There was several provisions throughout the ordinance that I would call just negative and nature. 1479 02:10:48,160 --> 02:10:53,720 They're like on that they're really unnecessary. They were within the ordinance like if you don't do this 1480 02:10:53,720 --> 02:10:59,320 We're gonna penalize you and use the enforcement provisions. Well that of course because of its an ordinance 1481 02:10:59,320 --> 02:11:05,960 It's implied so we still have our enforcement section and that's everything that's gonna enforce the whole ordinance 1482 02:11:05,960 --> 02:11:08,820 So hopefully it's just more public friendly 1483 02:11:12,690 --> 02:11:17,070 So a big change and it's not much of the text in the ordinance 1484 02:11:17,070 --> 02:11:24,730 But currently, any credit county has required any public improvements to be installed before 1485 02:11:24,730 --> 02:11:29,070 the final plan is approved and filed with the Register of Deeds Office. 1486 02:11:29,810 --> 02:11:35,490 Currently, our financial insurance for doing that will only require 50% down because we are 1487 02:11:35,490 --> 02:11:37,210 holding that final plan approval. 1488 02:11:38,090 --> 02:11:44,490 And this provision, I think, would be more developed or friendly, but yet still cover the 1489 02:11:44,490 --> 02:11:49,790 on concerns because the developer will have approval of the final 1490 02:11:49,790 --> 02:11:56,230 plat, but yet the county will still retain 120% financial assurance of what the 1491 02:11:56,230 --> 02:12:00,170 cost of the improvements are to make sure that they're implemented out there on 1492 02:12:00,170 --> 02:12:05,010 the site. So in other words, public improvements would come after final 1493 02:12:05,010 --> 02:12:09,830 plat approval first and before. Any questions on that one? 1494 02:12:14,690 --> 02:12:34,170 Yeah, so in other words if I'm putting in a development and I've got public improvements that I have to put in for roads or whatever it is, you're saying that if I got to spend a million for the road, now I've got to spend 2.2 million that I have to have cash. 1495 02:12:35,630 --> 02:12:54,390 Well, and that's what we're saying in the 20% and that 1.2 so we would have to have financial assurance for 1.2 and that plus you'd have to build the road but the financial assurance could be in a line of credit or whatever, you know, so 2.2 million, no, you need to have cash. 1496 02:12:54,390 --> 02:13:01,370 but what this really does is it takes the burden off from you and let's say that the 1497 02:13:01,370 --> 02:13:06,950 county changes the ordinance or let's say staff move on and they have a different interpretation 1498 02:13:06,950 --> 02:13:12,610 of the provisions and now you and you invested a million dollars in that road and now the 1499 02:13:12,610 --> 02:13:18,970 requirements change and that now you don't get your final plat approved that's a big deal 1500 02:13:18,970 --> 02:13:23,590 you know, and versus what we're saying is, hey, you're 1501 02:13:23,590 --> 02:13:26,230 final class approved, you got to have the financial assurance 1502 02:13:26,230 --> 02:13:29,810 because we got inflation costs, that's why it's 120% because it 1503 02:13:29,810 --> 02:13:31,170 could be up to three years later. 1504 02:13:31,690 --> 02:13:35,450 The million dollar project would require 1.2 million dollar 1505 02:13:35,450 --> 02:13:39,890 performance bond, a performance bond cost 1 to 3% of the total 1506 02:13:39,890 --> 02:13:41,030 project costs. 1507 02:13:44,080 --> 02:13:51,320 I don't know, last time I was pricing performance bonds, they were in the 1508 02:13:54,620 --> 02:14:03,740 the 120% that is the maximum that we're able to go to. So, yep. But from what we've kind of 1509 02:14:03,740 --> 02:14:08,220 talked with some of the developers already, you know, and that they were very supportive of 1510 02:14:08,220 --> 02:14:13,200 this concept, so that they knew that the green lights there, I gotta take and spend the money, 1511 02:14:13,840 --> 02:14:16,320 but at least know that everything's going to move forward. 1512 02:14:19,390 --> 02:14:23,850 I guess I don't see the need for the 120% 1513 02:14:23,850 --> 02:14:27,490 If you're going to provide a bond or whatever it is, 1514 02:14:27,750 --> 02:14:30,030 why would you need to be over a hundred percent? 1515 02:14:30,510 --> 02:14:31,530 That's a solution. 1516 02:14:36,550 --> 02:14:38,250 That'd be a public hearing on this, yep. 1517 02:14:44,500 --> 02:14:47,440 Are we going to, should we consider having an open house, 1518 02:14:47,640 --> 02:14:50,320 where we invite public to come in and make comments on this one? 1519 02:14:50,940 --> 02:14:52,180 These are some pretty big changes. 1520 02:14:52,640 --> 02:14:53,460 It's up to you. 1521 02:14:53,760 --> 02:14:56,720 And that's kind of the purpose of the public hearing, 1522 02:14:57,200 --> 02:14:59,920 and we have ample time to provide notice right now. 1523 02:15:00,000 --> 02:15:06,520 And we can even create a web page and put it on online, similar to the compliant, if you'd like. So, 1524 02:15:09,480 --> 02:15:13,660 I'm a public hearing. Would it be quite a public hearing? 1525 02:15:14,060 --> 02:15:28,640 Right, I get that public hearing happens within, you know, four minutes of actually taking the vote. And if we have an open house, it gives a lot more time for policymakers to consider what what's being said. 1526 02:15:28,640 --> 02:15:31,300 I know it's a lot more work for the staff. 1527 02:15:31,460 --> 02:15:32,980 I appreciate that I do. 1528 02:15:35,100 --> 02:15:39,160 I'm sorry I quite a few hours in this, so yeah, I get. 1529 02:15:39,260 --> 02:15:40,060 We are action item. 1530 02:15:40,100 --> 02:15:41,720 We could always be delighted to the following meeting. 1531 02:15:41,900 --> 02:15:44,460 You don't have to vote right after the public hearing. 1532 02:15:46,800 --> 02:15:47,240 Noted. 1533 02:15:47,880 --> 02:15:53,380 Noted. I just want, I don't, this is another case where we've got two builders on this committee 1534 02:15:53,380 --> 02:15:56,400 and both of them have put up a red flag on this one issue. 1535 02:15:56,400 --> 02:16:04,740 The last thing that I want to see is to pass this and then have a quarter of the bill 1536 02:16:04,740 --> 02:16:11,640 there's a sacred county come in here, angry that we did this because we didn't tell them. 1537 02:16:12,020 --> 02:16:14,120 I don't want anybody thinking we snuck something in. 1538 02:16:15,140 --> 02:16:21,580 So I want to take every opportunity that we can to make sure that we communicate this 1539 02:16:21,580 --> 02:16:22,760 and get input. 1540 02:16:22,760 --> 02:16:29,420 But I want if we take and send note the draft and that to the surveyors and developers 1541 02:16:29,420 --> 02:16:34,760 and that that we work with on a regular basis and that's so that they are very well 1542 02:16:34,760 --> 02:16:36,900 notified for the public hearing. 1543 02:16:38,300 --> 02:16:41,720 That's I think that's pretty good. 1544 02:16:41,980 --> 02:16:47,500 We're going to include realtors on that and I think they would be prudent. 1545 02:16:47,500 --> 02:16:52,380 But we try to find that list and can't guarantee that we'll hit every 1546 02:16:52,380 --> 02:16:56,000 reorder and that, but we can, we can maybe hit the branch office or 1547 02:16:56,000 --> 02:16:57,080 something within the colony. 1548 02:16:57,840 --> 02:17:05,460 So if you get a listing of the Sanctuary Valley Builders Association, you 1549 02:17:05,460 --> 02:17:10,060 can get a pretty decent listing of all of the main builders anyway from the 1550 02:17:10,060 --> 02:17:19,340 and then also the Western Wisconsin Realtors Association I think is the other one that you 1551 02:17:19,340 --> 02:17:25,760 could get a pretty decent listing of everybody that would and you may be able to just 1552 02:17:25,760 --> 02:17:28,700 send it to them and they can disperse the information. 1553 02:17:32,240 --> 02:17:37,380 No, I need to ask the question if we had any issues without getting the financial insurance 1554 02:17:37,380 --> 02:17:39,160 that we've ended up holding the bag. 1555 02:17:39,340 --> 02:17:41,820 Has the county lost money by not getting insurance? 1556 02:17:44,690 --> 02:17:48,570 I don't know if the county has, but in my 20 years, I've seen it at least twice. 1557 02:17:49,770 --> 02:17:54,330 I've seen it at least twice where a developer has gone under before they finish the project 1558 02:17:54,330 --> 02:17:56,570 and we had to exercise their performance bond. 1559 02:17:59,870 --> 02:18:05,490 I remember that the county is kind of a third party on this, too, because we'd be working 1560 02:18:05,490 --> 02:18:07,930 with the talents on completing these projects. 1561 02:18:10,240 --> 02:18:16,360 Okay, so in asking for, you know, increased communication, we're going to fill the room with a specific 1562 02:18:17,200 --> 02:18:21,780 population who are going to object to this, and I know that too, I just want to make sure 1563 02:18:21,780 --> 02:18:23,860 that we don't anger this population. 1564 02:18:24,040 --> 02:18:24,920 I don't know. 1565 02:18:25,880 --> 02:18:26,580 I don't know. 1566 02:18:27,240 --> 02:18:29,100 So, we're talking about the development in New Richmond. 1567 02:18:29,340 --> 02:18:32,520 There was next to the turkeys at the county purchase and then sold to developer. 1568 02:18:33,760 --> 02:18:34,920 Was that an unfinished? 1569 02:18:35,240 --> 02:18:36,280 It was unfinished. 1570 02:18:36,280 --> 02:18:39,560 I don't know if the city ended up taking a hit on that. 1571 02:18:39,700 --> 02:18:42,940 I know that the land came back to the county on tax abatement. 1572 02:18:43,180 --> 02:18:43,580 Yep. 1573 02:18:43,800 --> 02:18:45,780 And we sold it for a nice price. 1574 02:18:46,080 --> 02:18:47,520 But I think the developer really made out. 1575 02:18:47,520 --> 02:18:51,280 But I think they had to finish some of the utilities in that. 1576 02:18:52,120 --> 02:18:52,780 I don't think so. 1577 02:18:52,880 --> 02:18:57,620 I think they had everything right down to cable TV plugged into that. 1578 02:18:57,740 --> 02:18:58,200 Okay. 1579 02:18:58,980 --> 02:19:00,320 It was done. 1580 02:19:00,500 --> 02:19:01,440 It turned key project. 1581 02:19:01,760 --> 02:19:01,920 Yep. 1582 02:19:02,160 --> 02:19:04,680 It was my understanding on that. 1583 02:19:04,680 --> 02:19:11,900 was that the developer had invested, put in all the infrastructure, put it all the roads, storm, 1584 02:19:12,020 --> 02:19:22,320 sewer, everything was done. But was unaware that there was a huge fee that was due to the 1585 02:19:22,320 --> 02:19:33,180 city for sewer and water access charges and that put them under. It was an excess of a third 1586 02:19:33,180 --> 02:19:40,380 a million dollars in fees at the city was looking for and that put them over the top that 1587 02:19:40,380 --> 02:19:46,020 they couldn't get the funding or the financing to pay for the permits to get their final 1588 02:19:46,020 --> 02:19:46,900 platter approval. 1589 02:19:47,640 --> 02:19:51,880 I was just trying to think of a project in the county where the developer didn't go under, 1590 02:19:52,660 --> 02:19:54,600 but maybe they'd finish the utilities of that one. 1591 02:19:58,030 --> 02:19:58,090 Yeah. 1592 02:19:58,090 --> 02:20:02,610 And with the financial assurance, I know that's a huge increase from 50 to 120 percent, 1593 02:20:02,730 --> 02:20:03,950 but that's a faster turnaround. 1594 02:20:03,950 --> 02:20:13,690 There's provisions in the ordinance too that basically upon completion, that money is released back or that bond is released and that it's not upon right now 1595 02:20:13,690 --> 02:20:19,290 It kind of lingers on for many years after words where they could be like a partial release and stuff and that 1596 02:20:19,990 --> 02:20:25,010 We're just trying to keep it very simplified, but yet if we've got a development and they've already got the final plat record 1597 02:20:25,010 --> 02:20:29,810 And we only got 50% financial assurance and they walk away from it 1598 02:20:29,810 --> 02:20:32,770 What are we gonna do to take and make sure that stuff's put in? 1599 02:20:32,770 --> 02:20:37,110 So that's why we've increased it over a hundred percent. 1600 02:20:37,790 --> 02:20:41,190 But consider, I'd suggest to the committee, 1601 02:20:41,390 --> 02:20:42,970 we consider having a public hearing, 1602 02:20:44,550 --> 02:20:46,890 and then what would be a second thing to take the vote 1603 02:20:46,890 --> 02:20:49,850 a month later, and have discussion a month later. 1604 02:20:51,390 --> 02:20:53,510 As might sound crazy, and it might not be possible. 1605 02:20:53,850 --> 02:20:55,830 But I'm just throwing it out there. 1606 02:20:56,230 --> 02:20:59,930 Is it possible to let the individual contractor choose 1607 02:20:59,930 --> 02:21:01,530 which option they want to do it? 1608 02:21:01,530 --> 02:21:04,790 we have to set one standard. 1609 02:21:07,660 --> 02:21:10,120 I suppose it's possible and that you couldn't create it. 1610 02:21:10,320 --> 02:21:12,860 It's not typically done how we're doing it right now. 1611 02:21:13,000 --> 02:21:15,640 Typically, the financial assurance, the reason why there's 1612 02:21:15,640 --> 02:21:18,180 financial assurance is to make sure that it's done 1613 02:21:18,180 --> 02:21:19,980 because the final class has already been recorded. 1614 02:21:21,020 --> 02:21:23,480 So this is very unique, oh, we've got it. 1615 02:21:25,120 --> 02:21:28,720 And it's also delays the whole planning process, 1616 02:21:29,000 --> 02:21:32,080 of course, because and that you've got a preliminary that 1617 02:21:32,080 --> 02:21:36,340 comes in, then they get their preliminary approval from staff. 1618 02:21:36,800 --> 02:21:41,040 Now they go spend that, you know, quarter of a million million dollars, whatever, build 1619 02:21:41,040 --> 02:21:44,720 the road and everything, and now they're coming back for final product approval. 1620 02:21:44,880 --> 02:21:49,700 Well, what happens if the ordinance changed in there or what happens if staff say, and 1621 02:21:49,700 --> 02:21:51,260 no, sorry, it's not good enough. 1622 02:21:51,380 --> 02:21:52,440 We don't want to do that anymore. 1623 02:21:53,260 --> 02:21:56,940 You know, so at what point do you ask for the financial assurance at preliminary 1624 02:21:56,940 --> 02:22:00,080 plant or at final plant approval then what the change. 1625 02:22:00,480 --> 02:22:01,020 Final plant approval. 1626 02:22:02,040 --> 02:22:02,220 All right. 1627 02:22:02,420 --> 02:22:03,880 So they could get a preliminary plant. 1628 02:22:04,020 --> 02:22:08,040 They can go put all the utilities and then ask for final plant approval and they would 1629 02:22:08,040 --> 02:22:10,380 need no assurance because the utilities are already in. 1630 02:22:13,320 --> 02:22:14,320 So crazy works. 1631 02:22:16,470 --> 02:22:16,710 Correct. 1632 02:22:18,190 --> 02:22:21,190 So are you saying what would streamline this? 1633 02:22:21,210 --> 02:22:24,770 What would be better and still protect the interest of the taxpayers? 1634 02:22:26,710 --> 02:22:31,810 at what point should we be doing to make it easier for the contractor for the developer. 1635 02:22:32,090 --> 02:22:32,950 Like it's proposed. 1636 02:22:34,830 --> 02:22:35,310 Okay. 1637 02:22:35,310 --> 02:22:36,430 That's a final plat. 1638 02:22:36,670 --> 02:22:37,490 It should be done. 1639 02:22:37,830 --> 02:22:40,110 In other words, we should go through all the approvals. 1640 02:22:40,330 --> 02:22:41,910 Get all of our permits up front, right? 1641 02:22:42,430 --> 02:22:44,850 And then we should take and start construction. 1642 02:22:46,090 --> 02:22:48,910 And the financial assurance is to make sure that that happens. 1643 02:22:54,830 --> 02:22:54,990 All right. 1644 02:22:55,110 --> 02:22:55,250 Continue. 1645 02:22:58,830 --> 02:23:05,530 The next one that we changed was policy, was we simplified the land, disturbance section. 1646 02:23:06,330 --> 02:23:11,390 This is one of the things that was part of our last agenda topic about the chapter 15 amendments 1647 02:23:11,390 --> 02:23:12,490 for filling and grading. 1648 02:23:13,130 --> 02:23:18,410 We've got a lot of different provisions where maybe they've got to go through ten foot 1649 02:23:18,410 --> 02:23:28,850 You know, in that it's maybe 20 to 25 percent slope right now anything over 25 percent would be prohibited by the ordinance now that 1650 02:23:28,850 --> 02:23:37,490 Case on the middle of a farm field or something where there's no erosion potential that might be in a model will use you know, but if you got a you know 1651 02:23:38,690 --> 02:23:42,010 You've got a 150 feet of elevation that's 25% 1652 02:23:42,950 --> 02:23:44,530 That's a totally different thing. 1653 02:23:45,550 --> 02:23:48,570 This provision is kind of looking forward to what 1654 02:23:48,570 --> 02:23:50,810 Chapter 15 amendments might look like. 1655 02:23:51,110 --> 02:23:53,390 And that to try to simplify that process and create some 1656 02:23:53,390 --> 02:23:56,190 Performance Standards, so that is not just a prohibited use, 1657 02:23:56,690 --> 02:23:58,050 but that they have to file property, 1658 02:23:58,190 --> 02:23:59,030 erosion control. 1659 02:23:59,250 --> 02:24:00,950 They have to make sure that it's stabilized. 1660 02:24:02,270 --> 02:24:05,650 And so that, like I said, even some of the ditches 1661 02:24:05,650 --> 02:24:08,910 on their backswool or over 25% you know. 1662 02:24:09,510 --> 02:24:11,930 So it's just trying to put some context in there 1663 02:24:11,930 --> 02:24:12,710 about the differences. 1664 02:24:16,230 --> 02:24:18,370 Right now the company's got two different links 1665 02:24:18,370 --> 02:24:19,430 to with ratios. 1666 02:24:20,690 --> 02:24:24,910 Right now we specify parcels less than 10 acres at one 1667 02:24:24,910 --> 02:24:28,050 and parcels greater than 10 acres at one. 1668 02:24:28,350 --> 02:24:30,450 So we simplified it and we went to the bigger one. 1669 02:24:30,590 --> 02:24:32,150 So there's less restrictive. 1670 02:24:33,350 --> 02:24:35,310 And that is a four to one. 1671 02:24:35,310 --> 02:24:38,730 And then right now, because of the shape of lots, 1672 02:24:38,890 --> 02:24:44,350 can vary a bunch, there's like several pages of how to calculate what the width is 1673 02:24:44,350 --> 02:24:50,010 and basically we try to take and simplify it so that it's three measurements and see average of them. 1674 02:24:50,170 --> 02:24:55,150 So you take the widest part, you take the narrowest part, and you take one in the average or in the middle 1675 02:24:55,690 --> 02:25:03,010 and then you put all those together, then take your width times four and if your average is less than 1676 02:25:03,010 --> 02:25:07,090 whatever that be, so if it was 400, if it was 100 feet wide, you're good to go. 1677 02:25:12,960 --> 02:25:20,080 So, okay, one of the things that we don't do a lot of is developer agreements, but we 1678 02:25:20,080 --> 02:25:26,700 left it in there, just in case we need to use it someday down the road, but we did condense it down, 1679 02:25:26,720 --> 02:25:32,840 simplified the wording, so no big changes as far as what it actually is or what it can do. 1680 02:25:34,480 --> 02:25:37,340 The land division ordinance is kind of unique. 1681 02:25:38,080 --> 02:25:40,700 I've never heard of a waiver before. 1682 02:25:41,960 --> 02:25:44,540 Typically, those are considered variances. 1683 02:25:44,760 --> 02:25:49,000 And if you look at criteria, that a waiver was to be reviewed against. 1684 02:25:49,280 --> 02:25:53,760 It's very similar to a variance, unnecessary hardship, physical property limitations, 1685 02:25:54,040 --> 02:25:55,640 not contrary to public interest. 1686 02:25:56,160 --> 02:26:01,880 So we remove the waiver provisions and we imported variance provisions. 1687 02:26:01,880 --> 02:26:09,640 that those would go to the board of adjustment. So, there's no case law on labor's center of 1688 02:26:09,640 --> 02:26:14,460 land use and education, doesn't use labor's, you know, so I mean really you're asking for a 1689 02:26:14,460 --> 02:26:15,840 variance to the standard. 1690 02:26:19,580 --> 02:26:24,920 And then the current B section is quite lengthy so we do do that and we 1691 02:26:24,920 --> 02:26:31,100 simply reflect the committee's fee schedule that you approve as the fee schedule and the ordinance 1692 02:26:31,100 --> 02:26:37,420 for the ordinance. Do you need the fee schedule in the ordinance? Or could you reference a fee 1693 02:26:37,420 --> 02:26:42,080 schedule outside of the ordinance would be easier to update? That's what we did. And that is 1694 02:26:42,080 --> 02:26:47,480 that we just reference the fee schedule and that outside of the ordinance. So we removed all fees 1695 02:26:47,480 --> 02:26:51,520 and kept it very simple in the ordinance. So we don't have to amend the ordinance every time 1696 02:26:52,000 --> 02:26:53,420 and just look outside. 1697 02:27:01,890 --> 02:27:06,410 And just so that's not a shock. And that when we go out of public hearing 1698 02:27:06,410 --> 02:27:12,870 with this. The current documents about 108 pages long and it's almost cut in half directly 1699 02:27:12,870 --> 02:27:20,350 and that's about 54 pages long but really the policy changes have just been went over right here. 1700 02:27:20,810 --> 02:27:25,130 So there's not a lot of policy, there's a lot of duplicate text in several sections. 1701 02:27:25,490 --> 02:27:30,190 I think the conservation design stuff could be cut more. I mean it's something I would 1702 02:27:30,190 --> 02:27:36,250 encourage you to take and review because there's a lot of stuff about internal open space 1703 02:27:36,250 --> 02:27:40,710 within the group clusters, and there's a lot of provisions there, and that might still 1704 02:27:40,710 --> 02:27:45,810 scare developers away from using consecration design because it looks like a lot, but 1705 02:27:45,810 --> 02:27:51,430 it's really not that hard to meet, so it's something to throw out there, I'd encourage you 1706 02:27:51,430 --> 02:27:56,590 to review it and decide, you know, how will, how will attractive do we want to make conservation 1707 02:27:56,590 --> 02:27:58,450 design within St. Craig County? 1708 02:28:02,160 --> 02:28:07,200 We're going to have a conversation on conservation design at a later time when it becomes 1709 02:28:07,200 --> 02:28:17,820 clear subject and I suggest we do make it a future agenda item or workshop or something and I'm 1710 02:28:17,820 --> 02:28:23,060 saying that to avoid another 20 minute conversation because it's a very important topic 1711 02:28:25,420 --> 02:28:26,120 and I'm 1712 02:28:26,120 --> 02:28:32,060 not making light of it I think we need to delve into it and promote it. All right anything else 1713 02:28:35,540 --> 02:28:41,840 good. This morning when I woke up I was really just dancing around because I knew I got to here 1714 02:28:41,840 --> 02:28:49,240 financial report today. Anything? Sorry to disappoint you. This is through February, so it's really 1715 02:28:49,240 --> 02:28:53,940 truly in the year to identify financial trends and red flags. If you saw something you want me to 1716 02:28:53,940 --> 02:28:56,020 answer though, I'll be happy to. 1717 02:28:58,130 --> 02:29:00,150 Otherwise the numbers aren't big enough to worry about yet. 1718 02:29:00,430 --> 02:29:03,410 I should have invited my friend Judy Oglerhoff. She was good at this. 1719 02:29:12,080 --> 02:29:14,140 Development, community development, carbon update. 1720 02:29:16,940 --> 02:29:19,600 Does anybody know that Jason had a baby the other day? 1721 02:29:19,600 --> 02:29:28,740 You know, named Clint, so otherwise I don't have anything else right now Mr. Chair. 1722 02:29:28,900 --> 02:29:35,180 I don't understand, now this is of course bonnets. West Central Wisconsin Regional Planning Committee. 1723 02:29:36,860 --> 02:29:40,500 Well that was the other day that already happened. That was a great meeting by the way. 1724 02:29:41,000 --> 02:29:47,600 We held the meeting yesterday at Bulmas Farms and Jason gave a phenomenal report on 1725 02:29:50,160 --> 02:29:58,080 and farmland preservation, and they very well received, and I want to make a public 1726 02:29:58,080 --> 02:29:59,980 thanks to this wall. 1727 02:30:00,000 --> 02:30:08,300 And Steve Schala, and just it was a great, great representative St. Craig County finale at the regional planning. 1728 02:30:08,520 --> 02:30:10,860 I request for a future agenda items. 1729 02:30:13,480 --> 02:30:15,560 Right, wait until next term. 1730 02:30:16,760 --> 02:30:19,260 Okay, the date of the next meeting is Thursday, April 18th. 1731 02:30:19,260 --> 02:30:23,760 I think it is not that date. So you will not have a meeting in April, your next meeting will be in May. 1732 02:30:24,180 --> 02:30:26,240 Because I'll be, thank you, you anticipated that. 1733 02:30:26,240 --> 02:30:27,160 Yes, I did, yeah. 1734 02:30:27,420 --> 02:30:29,820 I'll spend on every agenda, everyone's missed that. 1735 02:30:30,260 --> 02:30:33,460 Okay, so the day the next meeting will be 1736 02:30:34,540 --> 02:30:39,020 Well, well as the organization the organizer of the meeting is that's a point to okay 1737 02:30:39,020 --> 02:30:44,180 We don't know what the next meeting is. We don't need something until right the new colony board is constituted 1738 02:30:45,120 --> 02:30:48,860 Right, okay, guys stay tuned adjourn. Thank you