1 00:00:08,270 --> 00:00:35,930 Good morning, everyone. This is the regular August meeting of the CalTrain Board of Directors. And Madam Secretary, please call the roll to establish that we have a quorum. Director Abbey Koga is delayed, director Burt. Director Canapas, absent director Cohen. Here. Director G. President. Director Walton. Director Simlita. Here. Vice Chair Medina. President. And Chair Heminger. Here. You have a quorum. 2 00:00:35,930 --> 00:00:41,550 So unlike the Texas legislature, we'll proceed to do our business now. 3 00:00:43,810 --> 00:00:45,570 Let's do the Pledge of Allegiance. 4 00:00:48,450 --> 00:00:55,410 Pledge of Allegiance to the United States of America, to the Republic, which just stands, 5 00:00:55,910 --> 00:01:00,810 one nation under God, indivisible with liberty and justice for all. 6 00:01:00,810 --> 00:01:01,690 I 7 00:01:07,220 --> 00:01:18,440 believe that brings us to item 4 which is consideration of any request to declare an emergency and participate in our meetings nonetheless. 8 00:01:19,220 --> 00:01:23,300 Any requests? Any request to change the order of business? 9 00:01:24,800 --> 00:01:32,620 Seeing none, we'll leave it as it is. Item 6 is for public comment on items not on our agenda. 10 00:01:32,620 --> 00:01:35,300 and today are there any Madam Secretary? 11 00:01:35,520 --> 00:01:37,720 We do have one in person, Jeff Carter. 12 00:01:46,260 --> 00:01:46,880 Thank you very much. 13 00:01:47,040 --> 00:01:47,580 Good morning, everybody. 14 00:01:48,460 --> 00:01:50,120 Texas, I just say they do need help. 15 00:01:52,140 --> 00:01:59,240 Just like the mentioned that notice, you know, pretty good increase in ridership on trains. 16 00:01:59,240 --> 00:02:06,340 I've been riding and a lot of good increase in bike activity came down here on train 112 today. 17 00:02:06,340 --> 00:02:12,100 that one had a lot of bike activity and then my normal 18 00:02:12,100 --> 00:02:16,880 train when I go home from work at night from 22nd Street is 19 00:02:17,580 --> 00:02:23,520 train 518 and that one also is usually quite busy so you know I think 20 00:02:23,520 --> 00:02:27,220 really appreciate you know people are appreciating the new trains and all the 21 00:02:28,060 --> 00:02:33,200 everything that staff is doing to you know get Cal train you know back to 22 00:02:33,200 --> 00:02:41,600 pre-pandemic levels. Also looking forward to when the APCs are going to be certified. I know 23 00:02:41,600 --> 00:02:48,280 staffs diligently working on that and you know that's it for now. Thank you very much. 24 00:02:48,940 --> 00:02:52,460 We also have two virtual hands raised, Roland. 25 00:02:56,300 --> 00:02:59,440 Good morning and thank you. So what I would like 26 00:02:59,440 --> 00:03:06,360 to do this morning is to attract your attention to page four of your supplemental reading file, 27 00:03:07,080 --> 00:03:14,080 which is the B-New update, which shows that the preliminary design has now been delayed 28 00:03:14,080 --> 00:03:19,520 that these four months, because essentially what they're doing is they redesigning one of the 29 00:03:19,520 --> 00:03:29,180 cap cars and turning it into a battery electric locomotive. So the impact on the schedule is uncertain, 30 00:03:29,180 --> 00:03:33,220 But the thing I want to bring to you attention is that we are now two years and eighteen 31 00:03:33,220 --> 00:03:38,980 and a half million dollars into this thing and absolutely nothing to show for it whereby 32 00:03:39,520 --> 00:03:44,740 some members of the public suggested that we just buy battery electric locomotives 33 00:03:45,340 --> 00:03:52,500 and just tow EMUs up and down the patterns and all the way down to gear oil and back. 34 00:03:53,320 --> 00:03:58,420 The last thing I'd like to bring to you attention is that I'll certainly be a fancy meeting on 35 00:03:59,460 --> 00:04:05,380 Monday, and the best sound by it I got from the mayor of Salinas is that the Bay Area 36 00:04:05,380 --> 00:04:08,120 absolutely loves Monterey Bay on weekends. 37 00:04:09,520 --> 00:04:14,120 So my question in terms of planning is when are we going to start saying some kind of 38 00:04:14,120 --> 00:04:20,680 you know weekend service down to Giroi and hopefully beyond, and a midday service. 39 00:04:21,020 --> 00:04:25,400 And quite frankly, as I just counted correctly pointed out, everybody absolutely loves the 40 00:04:25,400 --> 00:04:31,480 B.M.U. That's included us, you know, a child's annual date and beyond. And down here, you know, 41 00:05:02,260 --> 00:05:32,240 Thank you. Good morning, Chair Steve Heminger and members. Alita Dupree for the record she and her with team folds. Wish I could be with you today. But I was in the room yesterday. I went to Sam Transit and some of you saw me and I did use the trains yesterday. We did have some problems around San Mateo. I endured some delays. I think it was a great crossing or track issue. I don't think the delays exceeded 10 minutes, but that's 42 00:05:32,240 --> 00:05:37,580 concerning. So I want to make sure that we tighten everything up with these great crossings. 43 00:05:38,220 --> 00:05:49,120 I also find that as I use your system, our system, is that I'm making multiple stops along the way. 44 00:05:49,320 --> 00:05:56,640 I'm not just writing San Francisco to San Carlos and back. Sometimes I write from San Francisco to 45 00:05:56,640 --> 00:06:02,720 San Mateo, then I backtracked to Berlin game, etc. 46 00:06:03,240 --> 00:06:06,420 What I'm finding I need to do is buy day passes on the app. 47 00:06:07,180 --> 00:06:09,380 It saves me money over buying Clipper. 48 00:06:10,260 --> 00:06:12,420 Because Clipper charges me for each ride. 49 00:06:13,840 --> 00:06:18,860 On one time last year I wrote Clipper back and forth to celebrate a couple of times 50 00:06:18,860 --> 00:06:21,580 and I guess it was a thing to save me money. 51 00:06:22,060 --> 00:06:24,080 I have to reach out the staff for that. 52 00:06:24,080 --> 00:06:35,740 but Clipper 2 is coming, though we don't have a date yet. However, Bart is planning to implement open payments later this month. 53 00:06:36,840 --> 00:06:48,940 This was disclosed at the Clipper Executive Board meeting, so what I'm sharing with you is public information that anyone can access, because I don't have special access to anything anyway, nor should I. 54 00:06:48,940 --> 00:06:51,480 So, how can we be ready for this? 55 00:06:52,700 --> 00:06:55,660 I'd like to see a skid into some kind of fair capping, 56 00:06:55,900 --> 00:06:58,560 because nobody should have to worry about overpaying. 57 00:06:58,840 --> 00:06:59,220 Thank you. 58 00:07:00,680 --> 00:07:02,560 We do have one more hand raised. 59 00:07:02,700 --> 00:07:03,520 Would you like to hear that? 60 00:07:03,900 --> 00:07:04,060 Yes. 61 00:07:04,260 --> 00:07:07,660 Susan, that is Adrian Brent. 62 00:07:12,660 --> 00:07:13,800 Okay, good morning, directors. 63 00:07:14,120 --> 00:07:15,700 Thank you for taking me. 64 00:07:15,720 --> 00:07:16,960 I joined a little bit late. 65 00:07:17,880 --> 00:07:22,380 I finally had a chance to review your special meeting on the budget. 66 00:07:22,380 --> 00:07:28,440 some months ago, and I was able to watch that video and I just had a couple of comments 67 00:07:28,440 --> 00:07:31,700 to add regarding distance-based fares. 68 00:07:31,900 --> 00:07:38,400 There was some conversation around that topic among the board and staff, and I believe 69 00:07:38,400 --> 00:07:43,720 the executive director said that we do have distance-based fares now, and I want to, there's 70 00:07:43,720 --> 00:07:49,460 a nuance to that is that we actually have zone-based fares right now, and I would like 71 00:07:49,460 --> 00:07:56,140 it too if you cross from one county into another in your car and you had to pay for gas to cross each 72 00:07:56,140 --> 00:08:02,880 entire county entirely. And that's what we have with the zone-based fare right now. If you cross 73 00:08:02,880 --> 00:08:09,440 from any zone into any other with one station stop, you have to pay for two entire fare zones. 74 00:08:10,020 --> 00:08:15,640 And so we actually have shorter rides that cost more than longer rides. So we clearly do not have 75 00:08:15,640 --> 00:08:21,380 distance-based fares. The CAC, some years ago, I can look it up for you. The staff has the 76 00:08:21,380 --> 00:08:26,840 resolution. unanimously, we put a lot of energy into this. We put it resolution together. 77 00:08:27,340 --> 00:08:33,640 unanimously put together an approved resolution requesting that the staff in the board work on 78 00:08:33,640 --> 00:08:39,040 moving to distance-based fares that are completely equitable and smooth, just like Bart has had since 79 00:08:39,040 --> 00:08:45,260 opening day. So that's something that I wanted to really clarify because I came up 80 00:08:45,640 --> 00:08:52,140 And the other one was, I think, around a question about if we could work with one conductor. 81 00:08:52,860 --> 00:08:57,300 Currently, many trains already may come to your surprise run with one conductor, 82 00:08:57,640 --> 00:08:59,140 because the other one isn't there. 83 00:08:59,880 --> 00:09:01,780 And they don't always collect fares. 84 00:09:02,180 --> 00:09:05,600 So what I'd like to suggest there is that we go to one conductor 85 00:09:05,600 --> 00:09:09,640 and then have, just like in Europe, a separate team of fairness factors. 86 00:09:09,840 --> 00:09:11,940 And that's much more effective. Thank you. 87 00:09:11,940 --> 00:09:13,000 We 88 00:09:15,880 --> 00:09:17,960 do have Adina Levin who just raised her hand. 89 00:09:18,680 --> 00:09:19,400 Allow. 90 00:09:20,640 --> 00:09:22,220 Well, sure, we'll bring you all on. 91 00:09:23,220 --> 00:09:24,300 Adina Levin. 92 00:09:25,500 --> 00:09:26,700 All right. 93 00:09:26,880 --> 00:09:27,400 Yes. 94 00:09:27,740 --> 00:09:33,980 So also on the clipper topic, 95 00:09:34,520 --> 00:09:41,440 it was announced that there's going to be open payment on 96 00:09:41,440 --> 00:09:48,860 start starting on at the end of August as you know the first release of that 97 00:09:48,860 --> 00:09:53,720 feature which is also going to be coming out on you know all the other 98 00:09:53,720 --> 00:09:57,040 or Clipper Agency sometime in the coming months. 99 00:09:58,020 --> 00:09:58,960 And... 100 00:10:00,590 --> 00:10:30,410 CalTrain has seen a lot of increase in ridership over the weekend in recreation and entertainment. And, you know, has marketing programs really focusing on people jumping on CalTrain to get to, you know, musical events and sports events and so on. And so, would like to encourage. And this may be already being done on the team, even though we don't know exactly what 101 00:10:30,410 --> 00:10:53,130 that open payment feature is going to be released for CalTrain, you know, to be ready to market and, you know, work with the other agencies to also market the open payment convenience for recreation and entertainment because that really greatly increases the convenience. 102 00:10:53,910 --> 00:11:03,250 You know, lots of people, if you use transit regularly, it doesn't matter as much if you have to have a special flip of card. 103 00:11:03,730 --> 00:11:10,730 But if you don't and you think, okay, I'm going to take how train do I need to get a special card or pay cash or get a special app it's confusing. 104 00:11:11,510 --> 00:11:16,210 And it's so much easier if you can pay with the credit or debit card if you have so getting ready to market it. 105 00:11:16,210 --> 00:11:23,380 we don't know exactly what date but it is predictable. So I'm working on that marketing is a opportunity to increase ridership. Thank you. 106 00:11:24,430 --> 00:11:25,870 That ends public comments. 107 00:11:27,210 --> 00:11:28,690 Thank you Madam Secretary. 108 00:11:29,930 --> 00:11:37,090 Colleagues that was part one of our meeting today. Part two is a closed session conference with our council. 109 00:11:37,870 --> 00:11:42,670 And I'll let him announce what we will be doing in closed session and for how long. 110 00:11:42,670 --> 00:11:50,210 Thank you, Chair. The board will be discussing Merlino versus PCJPB, and we anticipate that the 111 00:11:50,210 --> 00:11:56,510 closed session will last approximately 25 minutes with travel time up to the Gallagher 112 00:11:56,510 --> 00:11:56,930 Conference. 113 00:11:58,980 --> 00:12:04,860 So, everybody stay here except us, and we'll be back as quickly as we can. 114 00:12:15,420 --> 00:12:23,020 We are back in session, and I'll ask our council if he has anything to say. 115 00:12:23,420 --> 00:12:23,820 Thank you, Chair. 116 00:12:23,940 --> 00:12:25,480 There is nothing to report from close session. 117 00:12:26,140 --> 00:12:26,520 All right. 118 00:12:26,880 --> 00:12:32,840 So we move now to part three of our meeting, which is what we're used to seeing. 119 00:12:33,780 --> 00:12:36,960 And we'll begin with the report of our executive director. 120 00:12:37,460 --> 00:12:37,600 Great. 121 00:12:37,600 --> 00:12:46,240 Good morning, Chair Heminger Directors. Welcome back after a summer hiatus. It doesn't really feel like we had a summer hiatus. 122 00:12:47,400 --> 00:12:52,300 I really appreciate all of the good work that's been happening. 123 00:12:59,000 --> 00:13:03,020 Excuse me, so I will provide a brief update. 124 00:13:03,860 --> 00:13:06,340 First, as always, we start with safety. 125 00:13:07,220 --> 00:13:16,040 Again, we're bringing other grade crossings on board with the AI technology and so we have 126 00:13:16,040 --> 00:13:23,380 one in each county at this point really working through, again, using AI to identify the 127 00:13:23,380 --> 00:13:28,460 behaviors and then making very cost-effective changes to those grade crossings. 128 00:13:28,460 --> 00:13:33,120 We are really getting a lot of attention on this approach. 129 00:13:33,460 --> 00:13:38,440 I was presented at the APTA Rail Conference. 130 00:13:38,960 --> 00:13:43,880 We also are going to be presenting at the National Conference in Boston, 131 00:13:44,560 --> 00:13:46,060 as well as the Asheville Conference. 132 00:13:46,940 --> 00:13:51,880 And our friends from FTA and FRA are going to be at all of those places. 133 00:13:52,220 --> 00:13:56,820 And so we also have a single page that we've put together 134 00:13:56,820 --> 00:14:00,500 that talks about the program, I think we're calling it rapid deployment. 135 00:14:01,600 --> 00:14:06,580 And so, I'd like to provide a copy to you after this, in your travels, if you're talking 136 00:14:06,580 --> 00:14:12,700 about this, it does a really good job of identifying what we've been doing and really highlights 137 00:14:13,200 --> 00:14:17,720 using Broadway Burling Game as an example of how effective these changes can be. 138 00:14:18,200 --> 00:14:22,720 I also wanted to show you this, which is something that the team is incredibly proud of. 139 00:14:22,720 --> 00:14:29,400 At the rail conference, we were awarded the Rail Safety Gold Award, which is the highest 140 00:14:29,400 --> 00:14:32,140 award that a railroad can receive. 141 00:14:33,780 --> 00:14:40,460 And it just speaks to the good work that the team has been doing over the course of, 142 00:14:40,560 --> 00:14:46,400 frankly, the last three years at this point to really understand how safety culture needs 143 00:14:46,400 --> 00:14:54,940 needs to be a daily commitment and it needs daily attention and so anyways just wanted 144 00:14:54,940 --> 00:14:59,980 to let you know that we are very grateful for the support that we 145 00:15:01,720 --> 00:15:07,020 Discussions that are happening at the board level, including Sam Trans last night, VTA tonight. 146 00:15:07,780 --> 00:15:14,140 And Jason is going to be focused on this during his report under the legislative update. 147 00:15:15,820 --> 00:15:20,860 We are at work on the Guadalupe Creek Bridge. You see a couple of pictures here. 148 00:15:20,860 --> 00:15:33,240 We have diverted 155 fish from the stream, and so we are definitely moving forward. 149 00:15:33,960 --> 00:15:39,380 It is incredibly important that we've been able to maximize work windows as a result 150 00:15:39,380 --> 00:15:45,860 of not only diverting fish, but diverting the train traffic here, and sharing the team 151 00:15:45,860 --> 00:15:51,140 are working real hard to ensure that we are going to get this thing done in two creek windows. 152 00:15:51,420 --> 00:15:56,420 So you see here, we've just removed the last piece of MT1. 153 00:15:58,620 --> 00:16:01,960 Really good news on time performance and ridership. 154 00:16:03,220 --> 00:16:13,540 You see, we have reattained our 95% and are on track for 95% this month, but early days. 155 00:16:13,540 --> 00:16:17,480 But the real news here is all about ridership growth. 156 00:16:17,880 --> 00:16:20,920 For the first month, we are over a million riders. 157 00:16:22,240 --> 00:16:29,620 And you see, we're back at 65% pre-COVID, really outperforming what we thought we would 158 00:16:29,620 --> 00:16:33,320 on the weekend at 150% in excess of that. 159 00:16:34,120 --> 00:16:37,080 And June really has seen quite the spike. 160 00:16:37,660 --> 00:16:39,880 Special events really are contributing to this. 161 00:16:39,880 --> 00:16:45,600 But here's the thing, if we weren't providing the customer experience, if we weren't providing 162 00:16:45,600 --> 00:16:50,420 the on-time performance, a lot of those special event riders wouldn't be coming back. 163 00:16:50,640 --> 00:16:56,520 So I think that's sort of a, I was going to say gateway drug, that's the wrong, that's 164 00:16:56,520 --> 00:16:57,200 the wrong term. 165 00:16:58,600 --> 00:17:04,060 Really, people are testing the service and we find that they're coming back. 166 00:17:04,140 --> 00:17:05,120 So this is really good news. 167 00:17:05,220 --> 00:17:09,760 The other thing I want to emphasize here, because we always used to talk about our 75% 168 00:17:09,760 --> 00:17:16,260 on revenue recovery, and that was nation-leading pre-COVID. 169 00:17:17,120 --> 00:17:21,920 It was really important to emphasize, and it's in my executive director's report, 170 00:17:22,240 --> 00:17:26,120 but we have a little bit of a plug there because we're waiting for our year end. 171 00:17:26,600 --> 00:17:31,760 But, Calthrine is back at 30% Fairbox Recovery, and from everything we can glean, 172 00:17:32,640 --> 00:17:34,620 that is likely nation-leading. 173 00:17:35,340 --> 00:17:40,000 So, I want to point out, as we're talking about efficiency measures, and we're talking 174 00:17:40,000 --> 00:17:46,840 about accountability measures as part of SB-63, I do want to report that CalTrain really 175 00:17:46,840 --> 00:17:55,300 is continuing to cover a lot of its costs out of the Fairbox, and, you know, I will continue 176 00:17:55,300 --> 00:17:57,080 to emphasize that during these reports. 177 00:17:58,500 --> 00:18:04,580 Talked about special events through the summer, and we're going to continue to talk about 178 00:18:04,580 --> 00:18:07,620 places where people can go via 179 00:18:07,620 --> 00:18:11,080 CalTrain. And we have a marketing 180 00:18:11,080 --> 00:18:13,440 team that is really doing a great job of 181 00:18:13,440 --> 00:18:15,740 establishing partnerships with our local 182 00:18:15,740 --> 00:18:20,580 sports team. There will be a press event 183 00:18:20,580 --> 00:18:23,120 on Monday regarding the big sync. I think 184 00:18:23,120 --> 00:18:25,660 this is one of the major outcomes of the 185 00:18:25,660 --> 00:18:30,540 transformation action plan. We are looking 186 00:18:30,540 --> 00:18:34,460 at changing the schedules. I think it's 187 00:18:34,460 --> 00:18:40,780 twice a year but really doing it in concert with all of the agencies and so we don't see 188 00:18:41,620 --> 00:18:46,280 first of all the conversations are happening up front to make sure that there's not a gap 189 00:18:46,280 --> 00:18:53,940 in terms of transfers between systems and to the degree possible we are doing it at the same time 190 00:18:53,940 --> 00:19:01,520 and I think that is really really helping for riders who are transferring between systems to really 191 00:19:01,520 --> 00:19:06,880 have the the journey be a little bit more we call it legible. I think one of the metrics 192 00:19:06,880 --> 00:19:14,200 that we've started tracking are these transfers at Nobre. And we have had, again, this 193 00:19:14,200 --> 00:19:23,740 month a high point of nearly, I think it's more than 27,000. And this is, you know, higher 194 00:19:23,740 --> 00:19:28,360 as a percentage than it was pre-COVID. And I think that is a testament to the fact that 195 00:19:28,360 --> 00:19:34,820 that transfer is really much more convenient for our riders, so we'll continue to track 196 00:19:34,820 --> 00:19:39,760 that as a key KPI for how people are getting between the systems. 197 00:20:00,820 --> 00:20:28,960 Well, let's see if there are any. Colleagues, any questions of our executive director, director Burke? Yeah, Michelle, thanks so much for the update. I noticed in the correspondence that staff is moving forward with, if not quiet cars, quiet zones within cars. Correct, a quiet car. Apparently, that term is somehow copyrighted or whatever. 198 00:20:28,960 --> 00:20:56,980 So we're looking for a new term. So if anyone has any good ideas, and then second, I just want to note that on those safety measures that you alluded to that have been installed at Broadway Burling game and now Churchill in Palo Alto, several of us got a first hand walk through with Mike meter on really the details of those because I hadn't quite understood how the package all work. 199 00:20:56,980 --> 00:21:01,360 You know, we had heard it here, but until you go to an intersection, and one of the things 200 00:21:01,360 --> 00:21:05,640 that was really striking is, in addition to a whole bunch of other measures, the rail 201 00:21:05,640 --> 00:21:16,620 century, triggers an alert if someone lingers for 10 seconds in the crosswalk or moves out 202 00:21:16,620 --> 00:21:19,380 of the crosswalk upstream for two seconds. 203 00:21:19,380 --> 00:21:31,020 And then at our top committee, Mike presented a mock-up of a technology that's like a cattle 204 00:21:31,020 --> 00:21:36,260 guard for people that will be placed outside of the crosswalk. 205 00:21:36,720 --> 00:21:49,300 And I'm just really excited about how strong the access prevention will be from this 206 00:21:49,300 --> 00:21:58,200 a set of measures more than I think many of us thought was possible. And lastly, I noted 207 00:21:58,200 --> 00:22:06,100 that the weekday ridership is now up to 52% of pre-COVID. Overall, we're up to 65. 208 00:22:06,860 --> 00:22:15,240 But are we able to disaggregate the weekday numbers so that we know what where we are on 209 00:22:15,240 --> 00:22:20,480 mute hours, which is what really drives a number of trains and drives the need for grade 210 00:22:20,480 --> 00:22:21,100 crossings. 211 00:22:21,920 --> 00:22:28,320 Yeah, in answer to that, we do have a methodology that we use that is based on assumptions 212 00:22:28,860 --> 00:22:38,140 and clipper data, the great thing that I'm reporting it now, we have just finished some testing 213 00:22:38,140 --> 00:22:43,520 on our APCs that now shows that we're in excess of 95% accuracy. 214 00:22:43,520 --> 00:22:48,220 So we're looking to get those implemented on the entire fleet by end of August. 215 00:22:48,980 --> 00:22:56,420 I will report back in September on that, but that really is going to give us a train by train station by station. 216 00:22:57,560 --> 00:23:00,000 Composite and that will help us with all of our future planning. 217 00:23:00,960 --> 00:23:01,140 Yep. 218 00:23:04,040 --> 00:23:10,840 Michelle, you mentioned a fair box recovery number and you said it too fast for me to remember it. 219 00:23:12,100 --> 00:23:17,760 It's that we think roughly 30%, so it was 30% for last fiscal year. 220 00:23:18,000 --> 00:23:26,140 We're waiting for the audited numbers, so I believe it's in excess of 30% at this point. 221 00:23:26,320 --> 00:23:28,900 And where we were during the boom time? 222 00:23:29,060 --> 00:23:29,620 More than that. 223 00:23:31,620 --> 00:23:34,180 We were at almost 75%. 224 00:23:34,180 --> 00:23:34,400 Yeah. 225 00:23:35,060 --> 00:23:35,180 Yeah. 226 00:23:36,540 --> 00:23:43,700 Okay. Colleagues, any other questions, comments? Any public comment on the report? 227 00:23:44,140 --> 00:23:49,540 We do have one in-person and a virtual handway, so that starting in-person is Jeff Carter. 228 00:23:57,430 --> 00:24:03,950 All right. Thank you very much. I really appreciate the report, especially the safety improvements 229 00:24:03,950 --> 00:24:08,030 at grade crossings and I'd like to hear more about rail 230 00:24:08,030 --> 00:24:11,250 sentry as mentioned by Director Burke. 231 00:24:12,290 --> 00:24:15,010 But sounds like we're, CalTrain really 232 00:24:15,010 --> 00:24:18,470 makes some good progress at the grade crossings. 233 00:24:20,210 --> 00:24:22,930 Of course, ridership, I mentioned that earlier. 234 00:24:23,610 --> 00:24:24,670 I'm just meant in a report. 235 00:24:25,630 --> 00:24:27,650 Week end is up significantly. 236 00:24:28,030 --> 00:24:32,490 And I think that's because of the every 30-minute service. 237 00:24:32,490 --> 00:24:42,170 Now you don't have to really think about taking the train because it was running once per hour, but now every 30 minutes, that's a big, big difference. 238 00:24:42,650 --> 00:24:44,090 And that's a big, you know, incentive. 239 00:24:45,110 --> 00:24:59,570 And then as far as coordinating with Bart, you know, I know that the budget probably won't allow it, but at some point, maybe Carl Trink get to every 20 minute service that would match, you know, the Bart service, which is every 20 minutes currently. 240 00:25:00,000 --> 00:25:29,980 Member and members, so lead a decree for the record. She and her with team vaults. Good helpful report today. Thank you. 65% on our ridership. My expectations are exceeded. I think we're going to get a few more points by the end of the year. I think we think we can hit 75% by the end of the year. We're getting close to what's happening in New York. They're running about 80 to 90% on their commuter rail. I think people are going 241 00:25:29,980 --> 00:25:36,900 to come back to work in person. But more so, there's new users out there that we haven't seen yet, 242 00:25:38,000 --> 00:25:44,360 that we can show them the benefits of riding our train, especially with half-hour clock face 243 00:25:44,360 --> 00:25:50,640 service. It's pretty hard to find a place to park in San Carlos or San Mateo or Berlin Game. 244 00:25:51,700 --> 00:25:58,600 Take the train. You know, Berlin Game is kind of like the rodeo drive of the Bay Area. I was there 245 00:25:58,600 --> 00:26:02,920 yesterday and had dinner. That's very nice there. 246 00:26:05,560 --> 00:26:07,960 And Fairbox Recovery, we're coming back. 247 00:26:08,360 --> 00:26:16,280 I mean, certainly all the other funding we have to work on. As far as Bart transfers go, I mean, 248 00:26:16,300 --> 00:26:22,960 it's hard to get a number for that because let's say that I buy a day pass through the app, 249 00:26:22,960 --> 00:26:27,320 And then I get on Bart, which uses Clipper exclusively. 250 00:26:28,060 --> 00:26:30,820 Well, there's really no way that you're going to know that. 251 00:26:32,320 --> 00:26:35,700 So we have to allow that there may be some more Bart transfers 252 00:26:35,700 --> 00:26:39,460 for people who are using other means of paying for CalTrain, 253 00:26:40,040 --> 00:26:42,540 whether it be the app, which I use sometimes, 254 00:26:43,300 --> 00:26:50,400 or the small cadre of people that are buying tickets at our vending machines. 255 00:26:51,620 --> 00:26:53,700 So overall, it's a good report. 256 00:26:54,820 --> 00:26:57,840 I think our ridership is going to go up from here. 257 00:26:58,280 --> 00:26:58,680 Thank you. 258 00:26:59,920 --> 00:27:01,780 Next we have is Adrian Brent. 259 00:27:08,150 --> 00:27:09,350 Okay, there's the unmute. 260 00:27:10,550 --> 00:27:10,970 Thank you. 261 00:27:11,210 --> 00:27:14,830 Yeah, I wanted to tag on to the rail century conversation. 262 00:27:16,090 --> 00:27:20,070 What director Bert was talking about is all really great stuff 263 00:27:20,070 --> 00:27:23,970 and I really applaud Mike and everyone involved on the rail 264 00:27:23,970 --> 00:27:30,490 century, including the additional pavement markings, the soft hit, the linear pull, the 265 00:27:30,490 --> 00:27:35,730 linear pull, all of that is really proving to be very effective, very exciting stuff. 266 00:27:36,660 --> 00:27:44,290 The next segment I think of crossing danger that I think rail century is not yet addressing 267 00:27:44,290 --> 00:27:53,410 and I'm not sure it can, is automated enforcement of vehicle code violations that are occurring 268 00:27:53,410 --> 00:27:59,590 chronically all the time at many of our busy crossings including Churchill and 269 00:27:59,590 --> 00:28:05,990 Palo Alto. And that is where motorists are often mindedly or deliberately or 270 00:28:05,990 --> 00:28:11,010 impatiently they queue across the railroad tracks. And so that's where they're 271 00:28:11,010 --> 00:28:16,410 stopping their vehicle in a queue of cars waiting for a traffic light. And that is 272 00:28:16,410 --> 00:28:21,010 against the vehicle code. You're never allowed to begin crossing unless there is 273 00:28:21,010 --> 00:28:24,090 enough room to get your vehicle all the way across safely. 274 00:28:24,790 --> 00:28:28,070 There are camera systems that automatically 275 00:28:28,530 --> 00:28:31,090 can site those, catch those violations. 276 00:28:32,810 --> 00:28:34,930 And you can site or send warning letters 277 00:28:34,930 --> 00:28:37,970 like they do in Florida with Brightline. 278 00:28:38,610 --> 00:28:41,910 And increasingly we're hearing about the new speed cameras 279 00:28:41,910 --> 00:28:43,690 in San Francisco, et cetera. 280 00:28:44,070 --> 00:28:45,930 It's a super, super dangerous behavior. 281 00:28:46,490 --> 00:28:49,250 It can result in obviously a fatality and has 282 00:28:49,250 --> 00:28:52,190 and can damage our trains, in the worst case, 283 00:28:52,350 --> 00:28:54,850 can even derail a train if you're very unlucky. 284 00:28:55,070 --> 00:28:58,170 There have been cases of vehicles derailing trains. 285 00:28:58,170 --> 00:28:59,810 It's not common, but it's possible. 286 00:29:00,310 --> 00:29:03,570 So I think it's really the next low-hanging fruit piece 287 00:29:03,570 --> 00:29:04,590 that needs to be addressed. 288 00:29:05,350 --> 00:29:07,990 So, and I'm sure Mike and the team are thinking about it, 289 00:29:08,050 --> 00:29:09,310 but I wanted to bring it to your attention. 290 00:29:09,650 --> 00:29:10,010 Thank you. 291 00:29:11,370 --> 00:29:12,710 Last speaker is Roland. 292 00:29:16,360 --> 00:29:16,780 Thank you. 293 00:29:16,960 --> 00:29:19,420 And I've got a quick question to say in my hand, 294 00:29:19,420 --> 00:29:21,420 was raised before you went to closed session. 295 00:29:21,580 --> 00:29:23,440 Is this an appropriate time to make the comment 296 00:29:23,440 --> 00:29:24,260 that I was going to make? 297 00:29:24,660 --> 00:29:25,560 No, it's his email. 298 00:29:26,700 --> 00:29:27,020 Sure. 299 00:29:28,320 --> 00:29:28,800 OK. 300 00:29:29,940 --> 00:29:31,320 So let me kiss Samara. 301 00:29:31,480 --> 00:29:34,480 And then I'll speak to the executive director's comment. 302 00:29:35,620 --> 00:29:37,780 And then I'd like to bring you attention. 303 00:29:38,040 --> 00:29:40,220 Maliza Maliza was not reaching to the record. 304 00:30:00,000 --> 00:30:29,980 We know who the responsible party is. It's very well documented in the NTSB final accident report, but none of that report can be deposed in court of evidence. The appropriate code of action is to reach out to plaintiff counsel and recommend that they redirect the lawsuit to the actual party responsible for what happened. Now moving on to the executive directly. 305 00:30:29,980 --> 00:30:38,120 this report, as Chair Heminger pointed out, the Fairbox Recovery is not tracking the 306 00:30:38,120 --> 00:30:39,540 ridership recovery. 307 00:30:39,880 --> 00:30:46,600 That's an issue that needs to be studied and addressed as smart, currently at 130 percent 308 00:30:46,600 --> 00:30:54,380 of Fairbox Recovery, and in closing on the gray crossings, what's happening is very encouraging. 309 00:30:55,360 --> 00:31:02,780 The issue I've got is that the previous comments are commented about people backing up on the tracks. 310 00:31:03,360 --> 00:31:12,180 The issue that you've got is that you do not have road markings, clearly delimitating the area where people are not supposed to be backing up. 311 00:31:12,800 --> 00:31:18,660 And the way automated code enforcement is done in the UK is not because they just kind of stuck on the tracks. 312 00:31:18,660 --> 00:31:25,600 It's when the out of gate tries to close, the detection system detects a calendar track 313 00:31:25,600 --> 00:31:27,740 a lot of times, two things happen. 314 00:31:28,200 --> 00:31:32,680 The PTC stops the train and the camera takes a picture with a $1,000 fine. 315 00:31:32,880 --> 00:31:33,180 Thank you. 316 00:31:34,300 --> 00:31:35,760 That ends public comments. 317 00:31:36,600 --> 00:31:42,660 Thank you, Madam Secretary, which brings us to item 9, the consent calendar, which consists 318 00:31:42,660 --> 00:31:46,900 of items 9A through 9K. 319 00:31:46,900 --> 00:31:53,000 Okay. So first of all colleagues, is there a request for many of you to consider any 320 00:31:53,000 --> 00:31:54,260 of these matters separately? 321 00:31:58,220 --> 00:32:01,540 Seeing none, why don't we get it on the table? Is there 322 00:32:01,540 --> 00:32:08,060 a motion to approve the consent calendar? Still move? Is there any public comment on the 323 00:32:08,060 --> 00:32:11,940 consent calendar? There are no public comments. Okay. So let's call the roll. 324 00:32:12,420 --> 00:32:15,800 Director Abikoga? I. Director Burt. Yes. Director Cohen. 325 00:32:15,800 --> 00:32:17,520 one. All right. Director G. Yes. 326 00:32:17,680 --> 00:32:19,040 Circuit Walton. All right. 327 00:32:19,160 --> 00:32:20,360 Director Zimuda. All right. 328 00:32:20,520 --> 00:32:21,740 Vice Chair Medina. Yes. 329 00:32:21,960 --> 00:32:24,060 Chair Heminger. All right. Motion passes. 330 00:32:25,060 --> 00:32:25,720 Wonderful. 331 00:32:26,920 --> 00:32:29,800 That brings us down to item 10, 332 00:32:30,120 --> 00:32:34,640 which is a report on a report 333 00:32:35,420 --> 00:32:40,600 that we will shortly hear from Peter Rogoff about. 334 00:32:40,980 --> 00:32:41,940 I assume 335 00:32:41,940 --> 00:32:47,280 And our executive director would like to give him a few words of introduction. 336 00:32:47,280 --> 00:32:54,920 If she doesn't mind, I'll take the privilege of the chair and add to hers because I probably 337 00:32:54,920 --> 00:32:58,740 have known Peter a little bit longer than I've known Michelle. 338 00:32:59,760 --> 00:33:06,900 And I think we met on the Hill when you were working for the Senate Appropriations Committee. 339 00:33:07,760 --> 00:33:16,420 And Peter, no matter who he was meeting with, had a skull for everybody because the authorizing 340 00:33:16,420 --> 00:33:21,920 committees in the Congress like to promise the moon to anybody who crosses their doorstep. 341 00:33:22,280 --> 00:33:27,500 And then they dump the funding requests on the appropriators and they've got to figure 342 00:33:27,500 --> 00:33:28,720 out a way to pay for it. 343 00:33:29,200 --> 00:33:32,740 So it's a dynamic, I think, that continues to this day. 344 00:33:34,060 --> 00:33:38,780 But it was especially suited, I think, to Peter's temperament. 345 00:33:40,160 --> 00:33:46,440 In between then and now, he of course served as our nation's federal transit administrator. 346 00:33:47,940 --> 00:33:51,740 And I'm sure he's got plenty of war stories to tell about that. 347 00:33:53,860 --> 00:34:01,680 But it's been a pleasure knowing him this long and it's a pleasure introducing him and handing it off to you, Michelle, to do the honors. 348 00:34:02,540 --> 00:34:10,020 Thank you chair and I'll be I'll be very brief. Really appreciate Peter coming to talk to the board. 349 00:34:11,300 --> 00:34:19,420 Just with respect to context, as you all know, we are in the process of rebuilding our capital team. 350 00:34:20,600 --> 00:34:29,860 And as part of that, I just thought it would be very important for us to really arm ourselves with a little bit of data. 351 00:35:00,000 --> 00:35:29,980 That can be basically under our control. I think all of us have experienced this, first of all, at CalTrain, but second, at some of the other agencies where all of you serve. In addition to hearing from Peter today, Sherry has been having conversations with some of our existing contractors to really try and figure out from their perspective what could lead to, I want to say more success. 352 00:35:30,980 --> 00:35:38,600 delivery, which also would include certainly pricing certainty, but we do find ourselves 353 00:35:38,600 --> 00:35:46,840 in a situation where our jobs are coming in over which they are potentially fundable, 354 00:35:47,080 --> 00:35:53,260 even with some of the funding resources that we have through various transportation authorities. 355 00:35:53,620 --> 00:35:59,160 So I just wanted to use this opportunity to level set everybody's understanding of the influences 356 00:35:59,160 --> 00:36:04,880 that we're seeing out in the market. And I can't think of a better person to talk about that 357 00:36:04,880 --> 00:36:12,920 than Peter. I've actually became familiar with him during an APTA CEO's conference during which 358 00:36:12,920 --> 00:36:18,100 he presented about a couple of years ago. And I know he's been doing some work with VTA as well. 359 00:36:18,640 --> 00:36:23,580 So with that as an introduction and context setting, Peter, I'll turn it over to you. 360 00:36:24,400 --> 00:36:42,880 Well, thank you, Michelle. And yes, Stephen, I met when we both had a lot more hair many years ago, and it's really good to be with you and I'll apologize quickly in advance to board member Bert, who had received a similar but now dated version of this presentation a couple of years ago. 361 00:36:42,880 --> 00:36:46,400 So a lot has already been said about my background. 362 00:36:46,400 --> 00:36:50,620 I would just point out separate from my spin around government in a variety of positions. 363 00:36:51,340 --> 00:36:58,620 I did head up sound transit in Seattle, the regional transit provider that does both bus rapid 364 00:36:58,620 --> 00:37:04,000 transit and light rail and commuter rail for the less than seven years before going off 365 00:37:04,000 --> 00:37:05,560 into private practice where I am now. 366 00:37:05,560 --> 00:37:14,100 Now, I was really been asked as I have a number of times now to provide background on the 367 00:37:14,100 --> 00:37:18,880 acute cost pressures and sizable cost growth that a number of agencies have experienced. 368 00:37:19,080 --> 00:37:22,700 And I think the most important thing to just remind people in terms of grounding this 369 00:37:22,700 --> 00:37:28,220 discussion is this is not unique to transit projects and it is not unique to transportation 370 00:37:28,220 --> 00:37:32,860 projects, as you can see from this slide, it is something that's burdening infrastructure, 371 00:37:32,860 --> 00:37:35,860 not only all over the country but all over the world. 372 00:37:36,560 --> 00:37:38,580 While all projects have their own nuances, 373 00:37:39,220 --> 00:37:41,580 I'm going to discuss really the major factors 374 00:37:41,580 --> 00:37:43,940 that are driving this spiking costs 375 00:37:43,940 --> 00:37:46,260 in infrastructure construction 376 00:37:46,660 --> 00:37:50,660 and also conclude with some presenting some good news 377 00:37:50,660 --> 00:37:53,120 in terms of best practices that agencies are using 378 00:37:53,120 --> 00:37:56,320 to try to mitigate those costs 379 00:37:56,780 --> 00:37:58,860 even in this difficult pricing environment. 380 00:38:00,900 --> 00:38:02,560 Let me just catch up. 381 00:38:07,290 --> 00:38:11,890 I think most importantly, there was a lot of talk about supply chain challenges and 382 00:38:11,890 --> 00:38:17,410 the reality is, those have not returned to normal, notwithstanding what you might believe 383 00:38:17,410 --> 00:38:18,010 from the media. 384 00:38:18,150 --> 00:38:23,190 Earlier, 55% of surveyed construction firms reported that they are still having significant 385 00:38:23,190 --> 00:38:24,310 supply chain problems. 386 00:38:25,070 --> 00:38:29,590 As you can see, these graphs here from the Federal Reserve Economic Data Set show the price 387 00:38:29,590 --> 00:38:33,470 trajectory of the major construction materials through the first quarter of this year. 388 00:38:34,250 --> 00:38:38,090 And they make clear that the steady price climbs of the last five years have not yet really 389 00:38:38,090 --> 00:38:39,870 begun to seriously reverse themselves. 390 00:38:40,910 --> 00:38:46,610 To make matters even more challenging, transit projects specifically often require specialized 391 00:38:46,610 --> 00:38:52,570 components that require long lead times, and the uncertainty regarding future tariffs require 392 00:38:52,570 --> 00:38:58,630 a manufacturer is using any foreign content to assume worst-case scenarios when pricing 393 00:38:58,630 --> 00:38:59,290 their product. 394 00:39:00,330 --> 00:39:04,610 Even with these continuing price increases in material costs, there is another factor 395 00:39:04,610 --> 00:39:09,250 that looms far larger when it comes to driving up the cost of delivering these projects. 396 00:39:09,950 --> 00:39:15,110 And that is the acute shortage of skilled labor and the costs associated with obtaining and 397 00:39:15,110 --> 00:39:16,390 retaining skilled labor. 398 00:39:17,090 --> 00:39:22,130 As shown here, the annual survey performed by the associated general contractors showed 399 00:39:22,130 --> 00:39:26,890 that almost 80% of firms were struggling to fill some or all available positions. 400 00:39:27,610 --> 00:39:32,410 The industry wide shortages of skilled labor runs across all crafts and disciplines from 401 00:39:32,410 --> 00:39:36,410 carpenters, brick layers, pipe fitters, architects, and engineers. 402 00:39:37,130 --> 00:39:41,750 You hear that it is basically near impossible to find seasoned construction managers in the 403 00:39:41,750 --> 00:39:45,790 current market, and I will tell you from my own experience that the same is true for system 404 00:39:45,790 --> 00:39:46,270 engineers. 405 00:39:46,990 --> 00:39:56,370 When I was at Sound Transit, thanks to the $54 billion ballot measure we passed in 2016, we had five major projects progressing at the same time. 406 00:39:57,330 --> 00:39:59,910 And on a number of occasions we were saddened to learn 407 00:40:00,000 --> 00:40:29,020 Public hearing bonuses were effectively embedded somewhere in the prices we were being charged by our contractors. In the current market environment, what the contracting community is effectively saying is this. We know we are going to be busy for the next five years, no matter what. We are going to be incredibly selective on the projects that we will even bid on. But if you want to pay me a premium to build your project, I will take that premium and use it to steal staff and skilled crafts people away from my competitors to get your project built. 408 00:40:30,480 --> 00:40:34,840 We just aren't growing the pool of needed labor anywhere near, fast enough to meet demand. 409 00:40:35,220 --> 00:40:39,740 The associated building and contractors in their outlook for 2025 projected that we would 410 00:40:39,740 --> 00:40:46,660 need to attract 439,000 new workers into construction just to keep a pace with demand this year. 411 00:40:47,560 --> 00:40:52,200 Just two months ago, the NFIB reported that the shortage of the construction worker situation 412 00:40:52,200 --> 00:40:54,800 is actually worsened as this year has progressed. 413 00:40:56,020 --> 00:41:01,460 It is hard to overstate how much the historic surge in construction spending over the last 414 00:41:01,460 --> 00:41:05,780 four years is straining the capacity of the industry and fundamentally changing the 415 00:41:05,780 --> 00:41:09,160 negotiating leverage of contractors versus project owners. 416 00:41:09,940 --> 00:41:15,020 It was commonplace not that long ago and we all made remember these times that contractors 417 00:41:15,020 --> 00:41:20,540 would make money on some projects, lose money on others, with the goal of netting positive 418 00:41:20,540 --> 00:41:21,500 over the long term. 419 00:41:22,420 --> 00:41:27,760 Today, with this historic volume of construction money out on the street through the Recovery Act, 420 00:41:28,020 --> 00:41:33,020 through the Inflation Rejection Act, through the Chips Act, it's not hard to understand that 421 00:41:33,020 --> 00:41:37,740 no contractor wants to explain to their board in the current environment why they have lost money 422 00:41:37,740 --> 00:41:44,560 on any project. The AI revolution has also brought an entirely new demand segment to the construction 423 00:41:44,560 --> 00:41:50,980 market, data centers. AI companies are now willing to pay top dollar to get them built quickly. 424 00:41:51,500 --> 00:41:56,900 and quite frankly, public agencies really can't compete with those private AI companies in 425 00:41:56,900 --> 00:42:02,080 terms of the price they're willing to pay. Another cost driver for capital projects has been 426 00:42:02,080 --> 00:42:06,900 interest rates. Transit capital projects are of course financed using a wide variety of dead 427 00:42:06,900 --> 00:42:12,200 instruments and interest rates impact all of them. Rates are also impacting the carrying cost 428 00:42:12,200 --> 00:42:17,600 borne by the construction firms. Just a year ago the benchmark federal funds rate was at its highest 429 00:42:17,600 --> 00:42:22,640 level in 22 years. They have come down a bit obviously but we are still way above the levels 430 00:42:22,640 --> 00:42:27,400 experienced when the first cost estimates were developed for many of the projects currently 431 00:42:27,400 --> 00:42:33,560 trying to advance. Another important factor in the cost trajectory of these projects is reduced 432 00:42:33,560 --> 00:42:39,100 competition in the marketplace. I chose this particular project because it's less than four 433 00:42:39,100 --> 00:42:45,160 miles from my home in Seattle, but the state moved 520 bridge connects interstate 5 to the University 434 00:42:45,160 --> 00:42:51,280 the Washington campus and when washed out estimated, initially, they thought that it would 435 00:42:51,280 --> 00:42:53,380 cost roughly $800 million to replace. 436 00:42:54,380 --> 00:42:59,340 A couple of years ago, they received just two bids, the lowest of which was $1.3 billion. 437 00:43:00,640 --> 00:43:04,660 Back in 2021, the state received an average of six bids per project. 438 00:43:05,160 --> 00:43:10,660 In 2023, the average dropped to two and a half bids per project and today they have projects 439 00:43:10,660 --> 00:43:13,000 that are getting zero bids and just none. 440 00:43:13,800 --> 00:43:17,860 It also has to be noted that there have been a number of consolidations and mergers within 441 00:43:17,860 --> 00:43:21,620 the construction industry, which brings fewer competitors to the table. 442 00:43:22,960 --> 00:43:27,140 A much smaller and more recent project reflecting these troubling trends has been a bus rapid 443 00:43:27,140 --> 00:43:29,220 transit project in Raleigh, North Carolina. 444 00:43:30,140 --> 00:43:35,540 The new Bern Avenue BRT is the first of four planned BRT routes for Raleigh, and it basically 445 00:43:35,540 --> 00:43:39,260 involves fairly simple street work and some station work. 446 00:43:39,260 --> 00:43:44,960 This project was initially budgeted at $71.5 million with an estimated completion date 447 00:43:44,960 --> 00:43:46,260 at the end of this year. 448 00:43:47,160 --> 00:43:51,320 When they opened their bid solicitations in May of last year, they had received zero 449 00:43:51,320 --> 00:43:51,780 bids. 450 00:43:52,560 --> 00:43:56,740 When they went out for bid a second time, they received only one bid that was rejected 451 00:43:56,740 --> 00:43:57,580 as unaffordable. 452 00:43:57,840 --> 00:44:01,840 It was more than $40 million higher than the city's independent cost estimate. 453 00:44:02,820 --> 00:44:07,020 Only by going out a third time with smaller contract packages could they get something 454 00:44:07,020 --> 00:44:08,400 in the realm of affordability. 455 00:44:08,400 --> 00:44:14,280 The project is now expected to cost 97 million, given all the time it is taken to go out 456 00:44:14,280 --> 00:44:18,060 to bid three times the project now won't be delivered until 2030. 457 00:44:19,720 --> 00:44:24,440 In 2023, I had the opportunity to assist the White House Infrastructure Team in organizing 458 00:45:00,000 --> 00:45:29,720 Group of contractors. The continuing uncertainty around materials costs, labor availability, interest rates, and other factors like local permitting were requiring them to build those uncertainties into their asking price. The contractors today are looking for less complexity, less uncertainty, far less risk or shared risk with the project owner and a clear path to profitability. A very recent example of this has been the very sad but instructive lesson of the Washington Street Bridge and Providence 459 00:45:29,720 --> 00:45:35,600 Rhode Island. The bridge is a major arterial with very high traffic that had to be shut down overnight 460 00:45:36,040 --> 00:45:41,960 when an inspection revealed some very frightening structural concerns. Rhode Island DOT went to work 461 00:45:41,960 --> 00:45:47,660 right away to replace it. They estimated a new bridge would cost between 250 and 300 million and 462 00:45:47,660 --> 00:45:55,600 they invited more than 65 firms to submit bids. They received zero bids. When they surveyed the 463 00:45:55,600 --> 00:45:59,580 industry as to why nobody wanted to bid. It really came down to the complexity of the 464 00:45:59,580 --> 00:46:05,360 job and the contract terms right on Rhode Island DOT was insisting on. Basically, Rhode 465 00:46:05,360 --> 00:46:09,560 Island was using the old command and control approach to crafting their bid solicitation. 466 00:46:10,260 --> 00:46:14,900 They unilaterally set the terms and conditions and expected that the contracting community 467 00:46:14,900 --> 00:46:19,800 would be so enticed by such a large project that they would find a way to live within those 468 00:46:19,800 --> 00:46:22,700 terms. They were wrong and nobody bid. 469 00:46:23,940 --> 00:46:28,740 After extensive consultations with the industry, Rhode Island DOT eventually re-scoped to 470 00:46:28,740 --> 00:46:33,760 contract packages and revised their contract returns and received two bids. 471 00:46:34,640 --> 00:46:38,680 The new bridge is now finally under construction at a price that is nearly twice their initial 472 00:46:38,680 --> 00:46:42,020 estimate and will be delivered two years later than planned. 473 00:46:43,520 --> 00:46:48,620 So when you combine all the factors I've cited, the rising cost of materials, the supply chain 474 00:46:48,620 --> 00:46:54,620 disruptions, the acute shortage of skilled labor, higher interest rates, a lack of competition, 475 00:46:55,180 --> 00:47:00,420 and contractors either avoiding complexity or charging a premium for it, you end up with 476 00:47:00,420 --> 00:47:06,240 a skyward pointing curve on the construction cost index. This one happens to be produced by the 477 00:47:06,240 --> 00:47:12,040 Federal Highway Administration for Highway projects. Sadly, the FTA doesn't produce a parallel 478 00:47:12,040 --> 00:47:18,180 index just for transit projects, but if they did, given the added complexity of major transit projects, 479 00:47:18,180 --> 00:47:20,460 that cost curve might be even steeper. 480 00:47:21,380 --> 00:47:23,780 Transit projects can introduce unique risks. 481 00:47:24,160 --> 00:47:26,580 They are often built in dense urban environments 482 00:47:26,580 --> 00:47:28,500 that require limited construction hours 483 00:47:28,500 --> 00:47:30,780 and carry mandatory noise restrictions. 484 00:47:31,460 --> 00:47:34,940 They often involve extensive utility relocations. 485 00:47:35,180 --> 00:47:37,040 And as I know, you've experienced in California, 486 00:47:37,400 --> 00:47:39,680 we've certainly experienced in Washington State. 487 00:47:40,380 --> 00:47:42,720 The utilities can either be very cooperative 488 00:47:42,720 --> 00:47:43,940 or not very cooperative. 489 00:47:44,340 --> 00:47:45,780 And it just takes a whole lot of work 490 00:47:45,780 --> 00:47:46,800 to get them to the table. 491 00:47:47,700 --> 00:47:51,740 The property is often required to be purchased from private and public entities that may seek 492 00:47:51,740 --> 00:47:55,500 to delay the project to extract a higher price for the needed land. 493 00:47:56,520 --> 00:48:00,600 Local municipal governments often seek to impose their own will on projects being built 494 00:48:00,600 --> 00:48:04,120 within their city limits, adding to the risk and cost of the project. 495 00:48:04,840 --> 00:48:09,940 In the worst case scenarios, municipalities can insist on project changes very late in 496 00:48:09,940 --> 00:48:12,780 the process, triggering expensive change orders. 497 00:48:14,240 --> 00:48:19,060 The data I've been citing has all been national in scope and it's hard to tell if a situation 498 00:48:19,060 --> 00:48:23,800 is even more acute in California, but there is data available indicating that the challenges 499 00:48:23,800 --> 00:48:25,380 in California are very real. 500 00:48:26,300 --> 00:48:32,280 CalTrans publishes a very transparent, quarterly project watch list identifying projects that 501 00:48:32,280 --> 00:48:37,020 are at risk of exceeding their budget estimates, including projects that might exceed those estimates 502 00:48:37,020 --> 00:48:38,460 by more than 20%. 503 00:48:39,240 --> 00:48:44,240 I recently compared the reports between March of 2021 and the report from March of this year. 504 00:48:45,020 --> 00:48:49,300 And over that four-year span, the total number of cow trans projects deemed to be at risk 505 00:48:49,300 --> 00:48:55,060 for budget overruns more than doubled and the estimated dollars at risk based on the size 506 00:48:55,060 --> 00:49:00,640 of those projects for those projects grew by 634% over four years. 507 00:49:01,300 --> 00:49:06,460 The number of projects categorized as very high risk grew by 141%. 508 00:49:06,460 --> 00:49:09,200 namely likely to grow by 20% or more. 509 00:49:09,920 --> 00:49:13,880 While these numbers are grim, there actually is some positive news embedded in this data. 510 00:49:14,440 --> 00:49:18,160 While the percentage of projects at high or very high risk continues to grow, 511 00:49:18,420 --> 00:49:21,480 the rate at which they are growing is finally slowing down. 512 00:49:21,720 --> 00:49:24,740 So it's possible that we may actually be turning a corner. 513 00:49:26,100 --> 00:49:29,580 There are also added challenges of building projects in California that 514 00:49:29,580 --> 00:49:32,800 informs contractors thinking when bidding on projects here. 515 00:49:33,520 --> 00:49:39,060 contractors must price into their bid's risk premiums due to California's litigation 516 00:49:39,060 --> 00:49:44,340 climate, union labor requirements, and intense scrutiny from regulatory agencies. 517 00:49:45,780 --> 00:49:50,240 So how can public agencies still get their projects built in this extraordinarily challenging 518 00:49:50,240 --> 00:49:51,240 pricing environment? 519 00:49:51,880 --> 00:49:56,860 And the good news is that there actually are several best practices that are emerging that agencies 520 00:49:56,860 --> 00:49:59,980 these can employ to contain costs even on- 521 00:50:01,420 --> 00:50:20,500 They recognized that there were still riskiest, they had talked to their contractors who identified some of the riskiest elements that were driving their bid prices. And basically, mastod at MBTA decide, you know what, we'll do those jobs separately, sometimes with our own workforce, take it off the table so you could take that out of your price. 522 00:50:23,110 --> 00:50:28,410 AGCs can consider stipends to keep more competitors interested in the project longer, and I will 523 00:50:28,410 --> 00:50:31,390 tell you that we did this with some considerable success up in Seattle. 524 00:50:31,650 --> 00:50:37,630 We actually paid firms, we pre-qualified three firms when we were building a major maintenance 525 00:50:37,630 --> 00:50:41,690 facility, and we gave them each a million dollars to help develop their plans and their bids. 526 00:50:42,310 --> 00:50:47,090 It didn't cover all of their costs, but it made three of the companies much more receptive 527 00:50:47,090 --> 00:50:49,870 to staying in the game until we selected a final winner. 528 00:50:51,010 --> 00:50:59,810 and I should say even those agencies that didn't win, we were able to use some of the concepts in their bids in the final design for the best possible project. 529 00:51:01,010 --> 00:51:10,270 Increasingly, agencies are learning that if they can consult with the contract in community, they can bundle contracts and sequence work in a manner that brings more bidders to the table. 530 00:51:10,270 --> 00:51:21,570 Some contractors are much more comfortable taking on smaller jobs than large complex ones that are either beyond their expertise or beyond their ability to secure the necessary bonding or insurance. 531 00:51:22,630 --> 00:51:30,690 They may be fine with, for example, building station platforms as part of a rail extension, but they don't want any part of building the electrical substations. 532 00:51:32,290 --> 00:51:36,830 Nothing drives up the cost of projects more quickly than late breaking and painfully expensive 533 00:51:36,830 --> 00:51:41,710 change orders, and sadly, the reality is we have some construction firms out there who have 534 00:51:41,710 --> 00:51:47,070 seemingly embraced change orders as a business strategy. They submit the lowest bid to get the 535 00:51:47,070 --> 00:51:52,950 work knowing that their path to profitability is through change orders. When it comes to transit 536 00:51:52,950 --> 00:51:57,890 projects agencies need to get all the stakeholders to understand the trade-offs that must be made. 537 00:51:58,570 --> 00:52:03,030 Community leaders and elected officials need to appreciate that once the music has stopped 538 00:52:03,030 --> 00:52:08,390 on the design, they are not free to demand changes or hold up permits until those changes 539 00:52:08,390 --> 00:52:08,910 are made. 540 00:52:09,910 --> 00:52:14,490 This education efforts requires a ton of outreach at the very beginning of the project 541 00:52:14,490 --> 00:52:15,830 to get everyone on board. 542 00:52:16,910 --> 00:52:20,870 Project owners also need to make sure that they are selecting a delivery method for the project 543 00:52:20,870 --> 00:52:23,650 that actually matches their staff's ability to execute it. 544 00:52:24,770 --> 00:52:28,990 Lastly, while project owners naturally want to tell their taxpayers when a project will 545 00:52:28,990 --> 00:52:33,610 finally be delivered, it may make more sense for them to first consult with the contracting 546 00:52:33,610 --> 00:52:39,310 community on when it can be delivered given their availability and availability of needed 547 00:52:39,310 --> 00:52:39,690 labor. 548 00:52:40,130 --> 00:52:45,330 What you don't want to do is promise the project by a certain date and have a celebratory 549 00:52:45,330 --> 00:52:50,390 ground breaking and then watch the project get further and further behind schedule because 550 00:52:50,390 --> 00:52:54,130 is the contractor can't get the needed skilled labor on site. 551 00:52:54,900 --> 00:52:57,690 A contractor may bid a much more reachable price 552 00:52:58,040 --> 00:53:01,610 if they know that your project could fit into their schedule. 553 00:53:03,210 --> 00:53:06,850 So in conclusion, the many cost drivers I have cited 554 00:53:06,850 --> 00:53:09,230 are being felt across all infrastructure sectors, 555 00:53:09,410 --> 00:53:11,970 not just transit, not just transportation projects, 556 00:53:12,370 --> 00:53:13,890 and not just in the United States. 557 00:53:14,690 --> 00:53:16,650 Marketplace dynamics have changed dramatically 558 00:53:16,650 --> 00:53:19,490 due to strained industry capacity, lack of competition, 559 00:53:19,490 --> 00:53:24,750 high interest rates and contractors pursuing less complex and more profitable projects. 560 00:53:25,850 --> 00:53:29,690 And the new cost estimates for cow train projects and the similar projects in this region 561 00:53:29,690 --> 00:53:31,890 are in line with those national trends. 562 00:53:32,910 --> 00:53:36,670 Market conditions in the construction industry are always in flux, but I will tell you when 563 00:53:36,670 --> 00:53:41,290 I administered the Federal Transit Component of the Recovery Act in the early years of the 564 00:53:41,290 --> 00:53:46,390 first Obama term, we benefited from a very beneficial pricing environment when construction 565 00:53:46,390 --> 00:53:51,990 firms were thrilled to get any kind of work. We were in the midst of the greatest recession since 566 00:53:51,990 --> 00:53:57,050 the Great Depression, and the contracting community was just focused on securing enough cash flow 567 00:53:57,490 --> 00:54:02,990 to pay their leases on their equipment and keep staff employed. The market environment today 568 00:54:02,990 --> 00:54:08,690 couldn't be more different with contractors focusing on avoiding uncertainty and taking great care 569 00:54:08,690 --> 00:54:13,670 when selecting the projects on which they build. But the good news is that there are a variety of 570 00:54:13,670 --> 00:54:18,390 measures that agencies can take to contain costs even under these dramatically different 571 00:54:18,390 --> 00:54:19,270 market conditions. 572 00:54:20,150 --> 00:54:24,090 So that pretty much summarizes my presentation and I'm happy to answer any questions or 573 00:55:00,000 --> 00:55:07,980 There were a lot of rice miles around here and I'll leave it at that. I did want to ask you 574 00:55:07,980 --> 00:55:16,140 just to kick things off about the first cost change because the first one often happens 575 00:55:16,140 --> 00:55:23,740 when you've got an engineer's estimate and you go out to bid or you reach some other 576 00:55:23,740 --> 00:55:31,560 major milestone and then you've got a bust. And the fact is the project was never going 577 00:55:31,560 --> 00:55:38,440 to be brought in at the original engineers estimate anyway. And I'm wondering because 578 00:55:38,440 --> 00:55:44,460 this is endemic, I mean it's project after project after project and whether it's escalation 579 00:55:44,460 --> 00:55:50,980 or some kind of reserve that they're not willing to acknowledge that there are things they 580 00:55:50,980 --> 00:55:56,020 don't know, and they won't know them until they get to a certain point in the construction. 581 00:55:56,720 --> 00:55:58,860 Is there a way to get at that problem? 582 00:55:59,340 --> 00:56:06,340 Because that's not the contractor, that's the government agency that is responsible for 583 00:56:06,340 --> 00:56:07,780 giving us some kind of benchmark. 584 00:56:08,720 --> 00:56:10,700 Well, two answers to that. 585 00:56:10,900 --> 00:56:16,280 One, I've thought a fair bit about, you move your, I'm sorry, there you go. 586 00:56:16,660 --> 00:56:19,920 I've thought a fair bit about, let's get that slide back up. 587 00:56:19,920 --> 00:56:25,560 But the cow trans data, and I said, well, there may be a silver lining because the rate 588 00:56:25,560 --> 00:56:28,840 at which things are growing is slowing down. 589 00:56:29,180 --> 00:56:31,300 They're still growing, but it's slowing down. 590 00:56:32,180 --> 00:56:36,000 That could be because prices are normalizing a bit. 591 00:56:36,700 --> 00:56:41,040 It could also be that those initial estimates are just getting better, which is to say the 592 00:56:41,040 --> 00:56:46,060 delta between the initial estimate and the actual price is narrowing, and that doesn't 593 00:56:46,060 --> 00:56:48,940 necessarily speak to anything being cheaper for the taxpayer. 594 00:56:52,300 --> 00:56:58,000 One of the challenges, well coupled, I would always identify, I would often say that, 595 00:56:58,060 --> 00:57:04,420 you know, when sometimes those initial cost estimates are put together, you're at somewhere 596 00:57:04,420 --> 00:57:10,600 between zero and 30 percent design, there's just too many unknowns in that which is why 597 00:57:10,600 --> 00:57:15,180 at the federal level they insist on so much contingency when you're at such a low level 598 00:57:15,180 --> 00:57:21,140 of design, that in combination with the rapidity of which things are changing, and it's not 599 00:57:21,140 --> 00:57:27,520 just the material costs, labor costs, I guess I specifically focused on not just hiring 600 00:57:27,520 --> 00:57:32,320 the labor, but retaining them in this environment where someone's going to offer them an opportunity 601 00:57:32,920 --> 00:57:36,800 to go work for somebody else on a different job at a higher wage and a very short period 602 00:57:36,800 --> 00:57:44,920 of time, you know, the rate at which that has risen, you almost need to assume double digit 603 00:57:44,920 --> 00:57:52,060 percentage growth year-over-year. So when you're actually saying and putting a 604 00:57:52,060 --> 00:57:56,120 number and and transmitting it to a public owner be it a transit agency or a 605 00:57:56,120 --> 00:58:01,820 highway department and saying I can get this this is the price for something I'm 606 00:58:01,820 --> 00:58:07,320 going to deliver for you two and a half or three years hence they don't know that 607 00:58:07,320 --> 00:58:12,080 that trend is going to stop and and that often doesn't get into independent 608 00:58:12,080 --> 00:58:19,080 cost estimates. They have a tendency of looking at conditions now and companies that have the luxury 609 00:58:19,080 --> 00:58:24,240 of being selective are saying, I'm going to look at a worst-case scenario and bitter accordingly 610 00:58:24,240 --> 00:58:32,320 because again, my book is already busy for the next five years. So that's why I said, you know, 611 00:58:32,420 --> 00:58:38,520 the attitude seems to be, if you're willing to pay this premium, I'm willing to take on those risks 612 00:58:39,220 --> 00:58:44,220 and absent paying that premium. I'm going to be busy anyway with what I'm already booked up to do. 613 00:58:46,220 --> 00:58:52,560 It's like I say, a dramatically different mindset and attitude from where we were years ago, 614 00:58:53,620 --> 00:58:57,140 but the public owner is kind of need to adjust to the new reality. 615 00:58:58,460 --> 00:59:03,020 And I want to point out, you know, I don't want to make out the contractors to be 616 00:59:04,580 --> 00:59:09,460 you know, ripping anyone off and just lining their pockets. 617 00:59:10,580 --> 00:59:15,500 They are now starting to make the margins that they hope to make, you know, years ago. 618 00:59:17,560 --> 00:59:22,500 And they have boards of directors and in some cases public owners to answer to also. 619 00:59:22,500 --> 00:59:22,580 So, 620 00:59:25,450 --> 00:59:31,230 colleagues, anyone who joined the conversation, director G? 621 00:59:33,760 --> 00:59:46,140 Peter, thank you very much. I mean, this is my life. I mean, the work I do and there's so many ways to unpack what you've just shared and so many more stories to tell. 622 00:59:46,140 --> 00:59:51,920 I mean, we all have a role in cost management or cost increases. 623 00:59:52,400 --> 00:59:52,540 Yep. 624 00:59:53,100 --> 00:59:59,960 The public owner is burdened by bureaucracy and formulas and d- 625 01:00:00,000 --> 01:00:29,900 Books for decades, you know, and, you know, when I managed underground utility projects, I had to tell my administration, I'll blow that 5% in the first week and I did. I mean, you just started digging and you hit something and then it just falls apart right there. I've known elected officials in this region who say, well, it's $800 million right now. Maybe if I wait a little longer, the cost will go down. I know elected officials on a community 626 01:00:29,900 --> 01:00:34,920 center who will wait in during construction and want that change now, otherwise we won't go. 627 01:00:35,060 --> 01:00:42,040 I mean, the owner has a role in this to help manage cost or cost increases or mitigate changes. 628 01:00:42,380 --> 01:00:49,220 And the public owner is just alleging and looking backwards rather than looking forwards and anticipating. 629 01:00:49,220 --> 01:00:51,300 So the owner has a role in this too. 630 01:00:52,800 --> 01:00:59,080 Absolutely. I sometimes in the most frustrating parts of my career, I've said that the problem with 631 01:00:59,080 --> 01:01:06,340 public transportation is so damn public and sometimes that rears its head so in the sound 632 01:01:06,340 --> 01:01:12,240 transit taxing district we had 52 separate cities. We didn't build in all 52 but we built 633 01:01:12,240 --> 01:01:22,900 in many and we had to get permits for each one. And because we had such a large ballot measure 634 01:01:22,900 --> 01:01:29,600 pass, and because, not unlike California, the legislature is capped what local taxes can 635 01:01:29,600 --> 01:01:35,000 be raised. You're going through communities that are really hard pressed to just pay their bills. 636 01:01:36,180 --> 01:01:42,000 And here comes a transit agency that's $54 billion rich that wants to build through their community, 637 01:01:42,900 --> 01:01:48,320 and they start thinking about, well, maybe they'd also like to rebuild the street grid around all 638 01:01:48,320 --> 01:01:51,260 their stations because we haven't been able to afford to do that for years. 639 01:01:52,560 --> 01:01:55,840 And that somehow sometimes starts creeping into the project costs, right? 640 01:01:55,980 --> 01:02:00,080 I mean, those are the realities of building a public project. 641 01:02:00,400 --> 01:02:07,780 And that's why I talk about, if local leaders really want the project to be built, 642 01:02:07,780 --> 01:02:13,380 and are invested in its success, they also have to be invested in delivering it affordably, 643 01:02:13,840 --> 01:02:17,280 and not have the cost to be somebody else's problem. 644 01:02:18,320 --> 01:02:24,540 That's the typical what's in it for me, or current conversations about return to source. 645 01:02:25,420 --> 01:02:27,540 How do we get something out of it? 646 01:02:28,260 --> 01:02:32,740 The other trend line that you didn't talk about is the trend line for mega projects. 647 01:02:35,140 --> 01:02:42,480 My parent company's a construction company and we're just seeing the larger projects in the terms of mega project trends continue to grow. 648 01:02:42,480 --> 01:02:49,040 So, and not many firms are able to do that, and so the pond mega projects is getting smaller 649 01:02:49,040 --> 01:02:53,140 as the mega projects grow, 3, 4, 500, billion dollar projects. 650 01:02:53,620 --> 01:02:55,120 And that's just more challenging. 651 01:02:55,120 --> 01:03:01,220 Because as you know, the mergers and consolidations have brought fewer and fewer, I mean, you 652 01:03:01,220 --> 01:03:06,160 can almost count on one hand the number of firms that can come in and step in and do something 653 01:03:06,160 --> 01:03:06,640 like that. 654 01:03:07,700 --> 01:03:09,260 So, yes, absolutely. 655 01:03:11,440 --> 01:03:14,220 There's a slide I took out of this in the interest of time. 656 01:03:15,840 --> 01:03:20,720 In Missouri, the St. Louis Convention Center put out an expansion, 657 01:03:20,720 --> 01:03:25,220 their Convention Center, a fairly large project that also got zero bids 658 01:03:25,220 --> 01:03:26,520 in their first go-around. 659 01:03:27,360 --> 01:03:31,620 And when they asked the contracting community, you know, what's up? 660 01:03:31,620 --> 01:03:37,300 But they gave me like, hey, we're busy, your terms are kind of complicated. 661 01:03:38,420 --> 01:03:44,060 And by the way, we're also building a new sports arena and a whole new federal headquarters 662 01:03:44,060 --> 01:03:48,120 of the National Geospatial Agency. 663 01:03:48,960 --> 01:03:55,200 So even just having local capacity to be able to hire local capacity, we're not sure it's 664 01:03:55,200 --> 01:03:55,520 there. 665 01:03:56,480 --> 01:04:00,360 And if we have to pay, you're probably familiar with travelers. 666 01:04:02,080 --> 01:04:08,740 We in Seattle, we would, our contractors were importing skilled labor from other states. 667 01:04:09,200 --> 01:04:14,180 They would come in and work, you know, five or six days, get day off, work for, get 668 01:04:14,180 --> 01:04:14,820 flown home. 669 01:04:15,340 --> 01:04:16,660 You got to put them up in hotel rooms. 670 01:04:18,260 --> 01:04:20,780 You know, some of them were coming from Nebraska. 671 01:04:20,780 --> 01:04:25,760 I always felt they were getting Seattle wages while keeping their family in Nebraska. 672 01:04:25,760 --> 01:04:30,420 I always felt like I wanted to have the basketball concession in Nebraska because like they were 673 01:04:30,420 --> 01:04:33,800 doing really well and we needed them really badly. 674 01:04:35,700 --> 01:04:41,780 Now, you're sort of alluding to the toolkit of how we can help manage and I'm a fan for 675 01:04:41,780 --> 01:04:47,040 on these large projects, RFIs, getting at the contractor community and early laying out 676 01:04:47,040 --> 01:04:52,580 here the challenges and listening to what they will offer, the different project delivery 677 01:04:52,580 --> 01:04:57,920 methods, whether it be design bill, progressive design billed CMGs, CMGC stipends. 678 01:04:58,340 --> 01:04:59,980 we have to change as a problem. 679 01:05:00,000 --> 01:05:29,920 Donor, the way we deliver project and manage risk and share in that risk. And we have to de-risk projects, because the invisible hand in all of this are the insurance companies and others that are not willing to ensure we're not willing to bond. And they never show up at a meeting like this. They don't even pay attention. They're just looking at the sheet of the price. Yeah. Here's your price if you want to do it. Yeah. Increasingly folks are not, I wouldn't say it's a, it's, it's, it's 680 01:05:29,920 --> 01:05:30,960 pervasive at this point. 681 01:05:31,160 --> 01:05:32,700 But there are increasing number of examples 682 01:05:32,700 --> 01:05:34,580 where public owners are having to agree 683 01:05:35,320 --> 01:05:38,460 to monitor material costs 684 01:05:38,460 --> 01:05:41,260 and they will share in the cost of the upside. 685 01:05:41,900 --> 01:05:43,620 I've not seen it so much on labor costs, 686 01:05:44,260 --> 01:05:46,580 which is also always obviously a bigger driver. 687 01:05:48,120 --> 01:05:49,420 So yes, there is, 688 01:05:51,000 --> 01:05:53,500 I really think bringing folks in and saying, 689 01:05:54,600 --> 01:05:57,340 what about this project scares you the most 690 01:05:57,820 --> 01:06:01,120 And how can we either share in that cost, 691 01:06:01,600 --> 01:06:02,800 or can I take it off the table? 692 01:06:03,240 --> 01:06:04,620 Can I just bid that out separately 693 01:06:04,620 --> 01:06:07,300 for someone who might be specialized in that 694 01:06:07,300 --> 01:06:11,200 rather than you extend beyond your specialty 695 01:06:12,740 --> 01:06:14,320 and boost the price of it 696 01:06:14,320 --> 01:06:16,060 because you're just scared of it. 697 01:06:18,260 --> 01:06:19,740 And you might be able to, 698 01:06:19,940 --> 01:06:21,840 in the aggregate, bring the cost down. 699 01:06:22,220 --> 01:06:24,660 I also hear you on the different delivery methods 700 01:06:24,660 --> 01:06:26,220 I glossed over it rather quickly, 701 01:06:26,220 --> 01:06:35,900 But one of the things I really caution people is they just assume with all these different methods of delivering projects now that their staff can do any of them. 702 01:06:37,360 --> 01:06:42,520 And I will speak for myself we had a very rough time that sound transit for a few years. 703 01:06:43,520 --> 01:06:53,640 Moving from design bid bill to design build because we had because we had so many projects we had a lot of internal in house engineers that thought it was their job to design the project. 704 01:06:54,320 --> 01:06:59,680 and in a normal design bid build scenario it was and they were just very 705 01:06:59,680 --> 01:07:04,320 low to see that authority to contractor staff. So there was all this oversight 706 01:07:04,320 --> 01:07:08,240 going on and all of the second guessing going on and we were paying for it 707 01:07:08,240 --> 01:07:14,780 twice. Now I won't name a public agency south of here who was doing design bid 708 01:07:14,780 --> 01:07:19,340 build. I wanted to do CMGC design. Bill and all I did was word search and replace 709 01:07:19,340 --> 01:07:25,100 based design bid billed with CMGC, it doesn't work, it's a different culture, different mindset. 710 01:07:25,760 --> 01:07:30,600 The last comment and the chair mentioned this is that we know the players out there 711 01:07:30,600 --> 01:07:32,480 who will bid low and then change order. 712 01:07:33,360 --> 01:07:37,380 And we have to change the public owner, I believe the public owner culture just passing 713 01:07:37,380 --> 01:07:39,200 those contractors around to each other. 714 01:07:39,800 --> 01:07:45,820 They are just burning public owners left and right, and we all know who they are. 715 01:07:45,820 --> 01:07:51,740 And so any thoughts about how we can moderate those players that are out there? 716 01:07:52,320 --> 01:08:01,160 Well, because the lawyers are here, you know, saying that we should just name and shame them is carries risks. 717 01:08:02,040 --> 01:08:11,760 But I think there is, we at least in our, in our point, allotment process when competing projects in Seattle, 718 01:08:12,660 --> 01:08:20,100 were able to bring in the past performance of that contractor, at least on our projects. 719 01:08:21,560 --> 01:08:30,120 I think there should be ways within free and fair competition rules allowing you to have 720 01:08:30,120 --> 01:08:33,580 reputational issues brought into the conversation. 721 01:08:35,780 --> 01:08:44,760 I remember vividly watching one of, it was one of the cities, one of the 52 cities and 722 01:08:44,760 --> 01:08:51,800 I had caused to be watching the Everett City Council one day and watch them give for 723 01:08:51,800 --> 01:08:56,820 them a very large contract to a contractor that we had had just the hardest time with. 724 01:08:57,720 --> 01:09:02,180 And I was literally like texting the member of that council who was on my board saying, 725 01:09:02,180 --> 01:09:06,980 you know, you sure you want to do this, but things were wait, you know, they never asked us, 726 01:09:07,360 --> 01:09:12,800 right? So, you know, there's there should be a way of bringing those those conditions. 727 01:09:13,420 --> 01:09:19,200 The other reality, and I'm sure you've experienced this, there are some contractors who do a very 728 01:09:19,200 --> 01:09:24,780 good straight-up job five times out of six, and on that sixth job, it's just, you know, a litigious 729 01:09:24,780 --> 01:09:32,120 nightmare. Someone has to be careful for, you know, penalizing them into perpetuity. Sometimes that 730 01:09:32,120 --> 01:09:34,600 That might mean it was the owner's fault, not the contractors for it. 731 01:09:35,500 --> 01:09:39,660 No, I'm a big fan per qualification, where you can bring some of those things in, but 732 01:09:39,660 --> 01:09:45,040 it's just more work for the public owner, but I would argue cheaper work than paying attorneys 733 01:09:45,040 --> 01:09:48,100 on the back end in certain James, but it's just the reality of it. 734 01:09:48,140 --> 01:09:54,080 Well, the other thing is educating the public as to why you may not be taking the lowest bid. 735 01:09:55,800 --> 01:09:58,620 Because you said we're not going to pay that price in the end anyway. 736 01:09:58,620 --> 01:09:59,980 Thank you. 737 01:10:01,230 --> 01:10:28,610 As you've laid out, it's a really important topic and a really multifaceted one. There's not one panacea to solving it, but there are a number of areas that you and others have identified as really flaws in our current approach and which ones we might be able to turn the dial on and manage better ourselves, which ones were. 738 01:10:28,610 --> 01:10:44,550 We're subject to what's happening in the market right now, and just first touching on that you alluded to the difference between kind of the market during the Great Recession. 739 01:10:45,070 --> 01:10:57,650 We, in our city, had a major project and saw first time ever bids coming in well below projected estimates. 740 01:10:57,650 --> 01:11:05,210 We didn't see that during the COVID downturn because we primed the pump so much. 741 01:11:06,050 --> 01:11:11,870 Not to mention the whole supply chain disruption, those two factors coming together. 742 01:11:12,170 --> 01:11:13,930 And availability of labor during COVID? 743 01:11:14,490 --> 01:11:14,630 Yeah. 744 01:11:15,510 --> 01:11:27,250 But we're that those trends, the priming of the pump is now what we're continuing to see even after out of that COVID period. 745 01:11:27,250 --> 01:11:36,010 And I've thought that really a lot of the U.S. problem has been, you talked about the 746 01:11:36,010 --> 01:11:43,170 significant labor shortage at all levels, all the way up to kind of project upper levels 747 01:11:43,170 --> 01:11:47,430 in engineering and project management down to the skilled labor force. 748 01:11:48,390 --> 01:11:56,630 And as we've gone from a period nationally of under investing in major infrastructure projects, 749 01:11:56,630 --> 01:12:05,690 including transportation to a surge, it certainly seems like, unfortunately, that surge 750 01:12:05,690 --> 01:12:13,370 in overdue investment has compounded our problem perhaps pretty significantly on the 751 01:12:13,370 --> 01:12:18,570 cost side, and we really haven't been talking about that reality very much. 752 01:12:19,170 --> 01:12:23,550 And it's unfortunate because those of us who have said we've been under investing for 753 01:12:23,550 --> 01:12:30,510 long time, we get what we were looking for and we've created a whole new problem or at least 754 01:12:30,510 --> 01:12:37,550 compounded a problem that was already bad. But I do think that we need to recognize that. 755 01:12:38,330 --> 01:12:47,310 I also was thinking about kind of the overlap between the themes that you really pointed out 756 01:12:47,310 --> 01:12:55,810 and those that have been identified by Alon Levy in New York and their study on the transit 757 01:12:55,810 --> 01:13:02,990 cost project and then Flybear and all of his studies on mega projects and risks. 758 01:13:03,630 --> 01:13:10,230 Interestingly, we now have for the first time ever a book that is the masses are reading 759 01:13:10,230 --> 01:13:16,950 on many more of the masses on how big things get done and hopefully they'll then trickle 760 01:13:16,950 --> 01:13:20,770 down more of us into the more comprehensive studies. 761 01:13:20,970 --> 01:13:26,690 But a lot of that looks at why the US and certain other countries, 762 01:13:26,690 --> 01:13:35,290 and now Canada, are encountering drastically higher costs 763 01:13:35,290 --> 01:13:37,630 for these projects than elsewhere in the world, 764 01:13:37,630 --> 01:13:39,730 and what are the lessons to be learned there? 765 01:13:41,210 --> 01:13:44,610 And those, once again, the lessons are many. 766 01:13:44,610 --> 01:13:48,310 Unfortunately, it's not one or two and we solve the problem. 767 01:13:49,790 --> 01:13:54,650 But one of the things that struck me as I've been waiting into this even more deeply 768 01:13:54,650 --> 01:14:01,430 as you know on our BART extension, but actually I first kind of dove into this back when 769 01:14:01,430 --> 01:14:10,930 high speed rail first came forward in California and some really smart knowledgeable people predicting 770 01:15:00,000 --> 01:15:28,680 Look, you're heading down this path, and yet the policy makers and the policy makers and even leadership, executive leadership in agencies, continue to just head down a wrong path. And the educational part of that, how do we turn that around? I think, Michelle, bringing you here. 771 01:15:28,680 --> 01:15:44,780 is really valuable for us and it's part of what maybe needs to be a more systematic approach to how do we educate the policy makers, the executive teams, 772 01:15:45,600 --> 01:15:51,400 the legislators at the policy level, not just the agency, the press and the public. 773 01:15:53,240 --> 01:16:00,900 because if we aren't aligned in understanding how we need to do projects and the 774 01:16:00,900 --> 01:16:07,380 realities we face, then even if we get one or two of those segments starting to 775 01:16:07,380 --> 01:16:12,160 get it, we get pressure from elsewhere. I had, you know, we're looking in Palo Alto 776 01:16:12,160 --> 01:16:18,860 that we have through VTA, a committee on the future of the University Avenue 777 01:16:18,860 --> 01:16:29,060 intermodal station, one of the bigger regional hubs, and I had our local paper editor ask 778 01:16:29,060 --> 01:16:35,920 me just last week, well what's my grand vision for this and what would I really love to see 779 01:16:35,920 --> 01:16:44,040 and my answer was I want to see the best project that we can fund and execute. And he goes, 780 01:16:44,040 --> 01:16:49,980 No, but a whiteboard and I go no. We've got, I can show you five of those over the last 30 years 781 01:16:49,980 --> 01:16:58,980 and they've all gone nowhere. So I do think that your presentation today made me really reflect on 782 01:16:58,980 --> 01:17:08,600 how can we do a more deliberate and systematic education process that then will hopefully have 783 01:17:10,000 --> 01:17:16,100 a change in the systematic approaches at all levels and the understanding of what's 784 01:17:18,500 --> 01:17:26,340 feasible versus what we would ideally love to see and we start moving more toward what's 785 01:17:26,340 --> 01:17:26,780 feasible. 786 01:17:28,160 --> 01:17:32,740 And I'll add that one of the points that you brought out earlier on the skilled labor issue 787 01:17:32,740 --> 01:17:37,620 and then you went beyond the skilled labor into the engineering labor, etc., 788 01:17:39,810 --> 01:17:45,740 four years ago as we were addressing electrification, transformation in our community 789 01:17:46,090 --> 01:17:52,340 and encountering the workforce, skilled labor workforce issues and the engineering workforce issues 790 01:17:52,340 --> 01:18:01,780 with that. I engage with our local legislators to look at the state taking on a more systematic 791 01:18:01,780 --> 01:18:25,360 approach to this in housing labor, electrification labor, and civil engineering labor, and to my knowledge we still don't have any real good analysis of what capacities we need over the next two decades to achieve the outcomes that we're anticipating and planning for. 792 01:18:25,360 --> 01:18:29,400 and then begin to address those capacity needs. 793 01:18:29,940 --> 01:18:32,680 We are on a piecemeal basis addressing capacity. 794 01:18:32,940 --> 01:18:34,640 Well, we know that we need more, 795 01:18:34,800 --> 01:18:36,360 so we're funding this program. 796 01:18:36,720 --> 01:18:38,540 But there's no systematic approach to it. 797 01:18:38,620 --> 01:18:43,040 There's no analysis that has really looked forward in these areas 798 01:18:43,040 --> 01:18:45,640 and say, what's the shortage? 799 01:18:46,340 --> 01:18:50,680 But we're just hoping that the market will actually catch up to demand 800 01:18:50,680 --> 01:18:52,440 and actually train all those people. 801 01:18:52,440 --> 01:19:18,300 and I wholeheartedly agreed is one of the, there actually was at one time a workforce development component of the infrastructure bill, at least in a variety of drafts that in order to make sure that it's stated by partisan infrastructure law, certain things fell out of it, and unfortunately the workforce piece of it did, I was not in the middle of those negotiations, but it had been reported to me. 802 01:19:18,300 --> 01:19:26,940 You know, this goes back a long way, going back to the dissolution of trade 803 01:19:26,940 --> 01:19:33,620 high schools, which we did away with in part because people had very strong 804 01:19:33,620 --> 01:19:36,840 feelings that everyone should have the opportunity to go to college and we 805 01:19:36,840 --> 01:19:40,580 should not be tracking people certainly based on income and race into certain 806 01:19:40,580 --> 01:19:45,900 tracks in high schools. So we eliminated them and just then somehow the the 807 01:19:45,900 --> 01:19:52,320 training and development, the whole kind of apprenticeship and process didn't have 808 01:19:52,320 --> 01:19:55,320 a pipeline, it had to be developed and it was very haphazard. 809 01:19:57,640 --> 01:19:59,840 And now you know when you asked about 810 01:20:00,000 --> 01:20:28,040 In a career potential, that learning carpentry or learning pipe fitting, or it would be very different. But, you know, I got two kids in their 20s, and sometimes they're on receive, and sometimes they're not listening to anything. And, you know, so it's, it's, um, the, uh, we really do need to kind of take on the workforce component. And your point about high speed railing, California, by itself, 811 01:20:28,040 --> 01:20:35,040 through its own community college system probably should be much more focused on serving as a pipeline. 812 01:20:35,360 --> 01:20:42,300 You know, you see when governors entice companies to open a manufacturing facility, 813 01:20:42,620 --> 01:20:48,200 or some kind of specialized facility, they often bring their community college system to the table 814 01:20:48,200 --> 01:20:52,760 and say, what do you need? We'll train it basically on the state's time. 815 01:20:53,900 --> 01:20:57,840 And probably we need to do that more comprehensively in this area. 816 01:20:59,160 --> 01:21:02,180 Yeah, I think you're exactly right on the role of community colleges. 817 01:21:02,240 --> 01:21:07,960 In fact, one of the things that we were discussing four years ago was whether the pilot for 818 01:21:08,920 --> 01:21:16,860 backloric degrees through community colleges in California might be extended to increase the 819 01:21:18,700 --> 01:21:29,620 the very limited number of universities in our state that provide degrees in, for 820 01:21:29,620 --> 01:21:34,440 instance, power supply engineering and things like that. 821 01:21:34,680 --> 01:21:37,280 We only have two or three schools in the whole state that do it. 822 01:21:38,220 --> 01:21:44,900 So I think you're right and we just need to, so how do we get the systematic approach? 823 01:21:44,900 --> 01:21:51,520 We need to get the legislators educated to understand the problem. 824 01:21:51,880 --> 01:21:54,540 We hear on our level need to understand it. 825 01:21:54,980 --> 01:21:59,900 But as I kept backing up stream, how do we get to the solution? 826 01:22:00,860 --> 01:22:03,240 We have legislators who don't understand this. 827 01:22:03,540 --> 01:22:11,700 They got big plates, but we need to really figure out how do we go into a significant, 828 01:22:11,700 --> 01:22:16,600 to maybe a series of these kinds of seminars and their tight schedules for at least a group 829 01:22:16,600 --> 01:22:22,060 of them, so they really understand the problems and they can help us solve it. 830 01:22:23,260 --> 01:22:27,660 Especially trying to bridge, you've got legislators who love to sit on the education committee 831 01:22:27,660 --> 01:22:30,660 and something who likes to sit on the transportation committee and I'm not sure they talk to 832 01:22:30,660 --> 01:22:31,060 each other. 833 01:22:31,700 --> 01:22:33,020 So it's, it's, it's, it's, thank you. 834 01:22:34,480 --> 01:22:38,980 Let me ask if there are any public comment on Peter's report. 835 01:22:39,700 --> 01:22:43,480 that now. Starting with in-person Jeff Carter. 836 01:22:53,200 --> 01:23:06,720 Thank you very much. Appreciate the report. I understand a lot of things that you've said. Being the blue collar myself. I understand, you know, skilled labor trying to find skilled labor. 837 01:23:07,640 --> 01:23:12,920 When I went to high school, they had shop classes. Now they don't seem to have shop classes anymore. 838 01:23:14,780 --> 01:23:22,020 The average age in my industry, which was a ship repair, the average age was over 50. 839 01:23:22,360 --> 01:23:26,700 So you couldn't find young people to come in here and learn these skills. 840 01:23:32,210 --> 01:23:38,030 Also, you mentioned change orders, company I worked for. 841 01:23:38,110 --> 01:23:43,750 They had experts that could go over every little thing and find any little thing to create 842 01:23:43,750 --> 01:23:49,750 to change order and make more money for the company, so I completely understand that. 843 01:23:52,070 --> 01:23:59,490 Then the other thing, you know, high speed rail, you know, it's long overdue and cost 844 01:23:59,490 --> 01:24:07,290 or runs, unfortunately, you know, there's people that use, you know, things like CEQUA to 845 01:24:07,290 --> 01:24:16,310 to delay these type of projects, and as mentioned, delay and projects brings up the cost. 846 01:24:16,890 --> 01:24:22,830 So I think I really appreciate the report, and the CalTrain is looking into this. 847 01:24:23,030 --> 01:24:23,290 Thank you. 848 01:24:24,430 --> 01:24:26,790 Moving over to virtual hands raised, Roland. 849 01:24:29,990 --> 01:24:31,030 Thank you. 850 01:24:31,170 --> 01:24:38,130 I really appreciate this presentation, and the way I look at it, if you look at the first 851 01:24:38,130 --> 01:24:46,290 20 slides. That pretty much describes basically what happened in Japan in the latter part of 852 01:24:46,290 --> 01:24:54,950 the last century. But a big difference in Japan is that most of the owners are private owners, 853 01:24:54,950 --> 01:24:59,970 private for profit on this and the Army recalls their gun. 854 01:25:00,000 --> 01:25:27,720 That's what the public owner would do. But how did they address these problems? Well, as I said, they had the exact same problem. In the case, the absentee chronic lack of a carpenters and retiring and not having a new generation of carpenters. They took a completely different approach, which was an engineering approach. They actually eliminated most of the carpentry in all that make a project. 855 01:25:28,700 --> 01:25:34,900 and they eliminated both the formwork and the falsework, so none of these props and all that, 856 01:25:35,040 --> 01:25:41,540 none of that exists, they're typically in Japan. And the way they did it is by starting a completely 857 01:25:42,320 --> 01:25:50,860 redesign of the Mega Project as a giant puzzle and breaking it all down into components and making sure 858 01:25:50,860 --> 01:25:58,000 that every single one of the components weighs less than 30 tons, so that they don't need special 859 01:25:58,000 --> 01:26:05,200 road permits to transport them to the building site, and then they assemble the gigantic puzzle at 860 01:26:05,200 --> 01:26:11,440 night. I'm not saying this anywhere in the United States, which possibly the exceptional exception 861 01:26:11,440 --> 01:26:17,080 of if you should look at NASA and SpaceX, be what SpaceX are doing, they essentially 862 01:26:17,080 --> 01:26:23,000 other Japanese equal the mega crochet. Thank you. Next we have Alita Dupri. 863 01:26:25,690 --> 01:26:30,390 Thanks again, Chair Steve. Having earned members Alita Dupri for the record she and her with 864 01:26:30,390 --> 01:26:36,670 team vaults. Wish I could be with you in person. I'm a big fan of sound transit. I have my reduced 865 01:26:36,670 --> 01:26:43,430 fare or record card had it for probably about a decade. So sound transit is always with me. 866 01:26:45,770 --> 01:26:54,170 I'm really seeing two parts to this complexity of contracting and a shortage of labor. 867 01:26:54,770 --> 01:26:59,990 I've seen it all over the country. When Las Vegas had a building boom of mega-resorts, 868 01:27:00,870 --> 01:27:06,290 a lot of workers came from all over the country to come in and do that heavy construction. 869 01:27:07,950 --> 01:27:14,390 and how do we get all this work done and the public's only willing to pay so much 870 01:27:14,390 --> 01:27:20,250 and I want to get this work done here at CalTrain and get it done at Bart 871 01:27:20,250 --> 01:27:24,850 and get 300 new accessible stations built on the New York City subway. 872 01:27:25,610 --> 01:27:28,690 And we're seeing the gateway tunnel between New York and New Jersey 873 01:27:28,690 --> 01:27:31,570 and Newport Authority bus terminals so much to do. 874 01:27:31,570 --> 01:27:34,310 So, where do we get the pipeline of people? 875 01:27:35,470 --> 01:27:43,730 I do wish that there was a greater pipeline of encouraging people over the years to learn 876 01:27:43,730 --> 01:27:44,490 the traits. 877 01:27:45,770 --> 01:27:47,570 I was blue collars they get. 878 01:27:48,210 --> 01:27:52,390 I just barely made it out of high school and ended up going in the army for a while. 879 01:27:52,390 --> 01:28:05,350 And so I worked in various kinds of blue collar work, but I wasn't involved in the skilled construction type trades. 880 01:28:06,270 --> 01:28:17,630 And I'm only one person. I'm retired now. But I believe that the trades are something that needs to absolutely be respected and promote it. 881 01:28:17,630 --> 01:28:25,470 because it really is the traits that are going to help bring the work forward in our country. Thank you. 882 01:28:26,570 --> 01:28:28,410 Next speaker is Doug Delong. 883 01:28:34,160 --> 01:28:35,800 Good morning, directors. 884 01:28:37,640 --> 01:28:43,060 Well, I appreciate all the thoughtful conversation that we've had on this item. 885 01:28:44,840 --> 01:28:51,500 But I had kind of a rather different take on the material. 886 01:28:51,500 --> 01:28:54,320 of this presentation that I reviewed in advance of the meeting. 887 01:28:56,840 --> 01:29:04,020 And it kind of resonated with some things that I've been aware of through, you know, 888 01:29:04,160 --> 01:29:09,300 concerned about issues like affordable housing and, you know, now what's getting a lot of 889 01:29:09,300 --> 01:29:16,760 press, the homelessness crisis, and, you know, years ago it was pretty clear to me that the 890 01:29:16,760 --> 01:29:24,300 local economy here in Mountain View, basically everything that wasn't the tech industry was being crushed by the tech industry. 891 01:29:27,120 --> 01:29:34,540 And, you know, the venture capital industry, their primary product is increasing income inequality. 892 01:30:00,000 --> 01:30:29,980 The question is to provide higher returns than any other vehicle. So their job, one, is increasing income and inequality. And they're very good at it. And they're creating homelessness faster than anybody could possibly deal with it. And now through this presentation, we're hearing that all these, this mania for AI data centers and crypto data centers, cryptocurrency data centers is basically throwing unlimited amounts of money at the 893 01:30:29,980 --> 01:30:35,520 construction industry and surprise surprise they have no interest in cost 894 01:30:35,520 --> 01:30:43,880 effectively bidding public infrastructure projects. So my takeaway is tech is 895 01:30:43,880 --> 01:30:47,380 not the solution, tech is the problem. Thank you very much. 896 01:30:48,780 --> 01:30:50,720 Last and final speakers, Adina Levin. 897 01:30:53,890 --> 01:31:00,110 Hello, Adina Levin with Seamless Bay Area. Glad to hear this presentation and to 898 01:31:00,110 --> 01:31:11,370 have the Caltrain Board engaging in this really important topic that impacts Caltrain and 899 01:31:11,810 --> 01:31:20,390 major projects in the Bay Area, California, and in the United States. It was good to hear 900 01:31:20,390 --> 01:31:29,750 where the interest in education, you know, at the higher level on what the problems are 901 01:31:29,750 --> 01:31:38,330 and what the causes are and potential ways of addressing them, there are initiatives 902 01:31:38,330 --> 01:31:46,070 like the Transit Cross project out of NYU that has, you know, put together a lot of information. 903 01:31:46,070 --> 01:31:51,330 There's Circula San Diego just put out a report this week. 904 01:31:52,240 --> 01:31:58,730 The Californians for Electric Rail have some good analysis about the role of patchwork 905 01:31:58,730 --> 01:32:11,490 funding in causing delays and overruns and having the education at the level of the people 906 01:32:11,490 --> 01:32:15,390 at agencies as well as people in the legislature is helpful. 907 01:32:16,170 --> 01:32:21,530 Last year, Buffy Wix led some hearings at Focus Day on permitting, and 908 01:32:21,530 --> 01:32:24,270 they talked about housing and energy and transportation. 909 01:32:24,830 --> 01:32:29,650 The transportation piece was the least mature, I think, out of that body of work. 910 01:32:30,390 --> 01:32:33,450 And there's an opportunity to come back and do more there. 911 01:32:34,050 --> 01:32:39,730 Another opportunity in the really short term, there's a state transit transformation task force, 912 01:32:39,730 --> 01:32:53,870 making policy recommendations to the legislature and there were some reluctance by transit to take this on would encourage Michelle Bouchart to work with CTA to make sure there's good recommendations coming out of that state task force. Thank you. 913 01:32:54,970 --> 01:32:57,010 We do have one more would you like to allow? 914 01:32:57,430 --> 01:32:58,070 Of course. 915 01:32:59,130 --> 01:32:59,970 Paul went. 916 01:32:59,970 --> 01:33:00,890 Hi, 917 01:33:03,240 --> 01:33:09,760 I'm just going to be very brief. This was just a wonderful eye-opening presentation. I applaud 918 01:33:10,440 --> 01:33:18,280 the speaker and and CalTrain board for for having this presentation that I just want to say. I 919 01:33:18,280 --> 01:33:23,000 attend these CalTrain board meetings and there's a lot of boring stuff that goes on and this just makes 920 01:33:23,000 --> 01:33:31,120 it all worthwhile to attend a very eye-opening. Most of the stuff I didn't realize, so thank you very 921 01:33:31,120 --> 01:33:34,300 much. That ends public comments. 922 01:33:34,660 --> 01:33:41,860 Well, and we won't take that personally, so colleagues, last call for any comments 923 01:33:41,860 --> 01:33:44,900 on this subject. Anybody? 924 01:33:46,220 --> 01:33:48,940 Peter, you're off the hook. It's great to see you again. 925 01:33:52,180 --> 01:33:58,700 That brings us to item 11, which is our legislative update and the proposed position on a bill. 926 01:34:01,320 --> 01:34:01,920 Mr. Baker. 927 01:34:03,160 --> 01:34:08,520 That's right, Mr. Chair, I was going to say I'll ask you to shift gears a little bit 928 01:34:08,520 --> 01:34:13,340 from thoughtful and interesting guy to me for a brief legislative update. 929 01:34:13,820 --> 01:34:18,020 I think what I'll do is do all the update first and then take that bill SB 30 so we can 930 01:34:18,020 --> 01:34:20,340 have it in a bite-sized chunk if that works for you. 931 01:34:21,960 --> 01:34:27,940 So in terms of appropriations, the House appropriations bill advanced out of Committee on July 14th 932 01:34:27,940 --> 01:34:31,600 And the Senate bill came out on July 24th, so that is moving along. 933 01:34:32,380 --> 01:34:37,360 The Senate bill appropriates the majority of public transit and rail funding authorized 934 01:34:37,360 --> 01:34:38,500 by the IAJA. 935 01:34:38,780 --> 01:34:42,640 And that's good news, because we weren't quite sure that that would happen. 936 01:34:43,220 --> 01:34:49,000 It provides about $21 billion for transit and $16 billion for passenger and freight rail, 937 01:34:49,160 --> 01:34:52,180 which is a little bit more than a fiscal year, $25. 938 01:34:53,160 --> 01:34:55,660 They'll be ongoing negotiations coming up in September. 939 01:34:55,660 --> 01:34:59,760 and there is a current. 940 01:35:00,110 --> 01:35:13,750 The current continuing resolution to fund the government is set to expire September 30th unless something else happens. The DOT announced Mark Mellonaro as a 16th Senate confirmed administrator to the FDA FTA. 941 01:35:16,790 --> 01:35:30,090 In terms of the surface transportation reauthorization, the DOT is issued a formal request for inviting comments for the next surface transportation bill, and Chairman Graves is continuing work on a bipartisan service bill before September 30th. 942 01:35:30,090 --> 01:35:31,550 October 30th, so we're tracking that. 943 01:35:32,130 --> 01:35:38,130 On June 30th, the DOT released revisions to the NEPO implementing process, including 944 01:35:38,130 --> 01:35:41,290 deadline reforms and page limit on environmental reviews. 945 01:35:42,510 --> 01:35:46,810 And then in high speed rail news, you probably have heard this on July 16th, Secretary Duffy 946 01:35:46,810 --> 01:35:52,870 announced the FRA would terminate two federal grant agreements totaling $4 billion for the 947 01:35:52,870 --> 01:35:55,730 California high speed rail project. 948 01:35:55,730 --> 01:36:00,970 on July 17th, California filed a lawsuit seeking declaratory and 949 01:36:00,970 --> 01:36:05,530 injective relief, and so we're following the progress of that. 950 01:36:07,110 --> 01:36:15,530 In terms of state legislative update, there are some dates up there in terms of the legislature's coming back on August 18th. 951 01:36:15,590 --> 01:36:23,890 And then there are days up there that you can read for yourself in terms of when the amended lines house passage in the governor to sign or 952 01:36:23,890 --> 01:36:28,990 our veto bills, that's particularly relevant schedule, considering SB-XB-63, it makes 953 01:36:28,990 --> 01:36:33,010 its way through the legislature and is bumping up against, I think, each of those deadlines 954 01:36:33,010 --> 01:36:35,130 on its way out of the legislature. 955 01:36:36,890 --> 01:36:41,550 In terms of a state budget agreement in late June, the governor and legislature did come 956 01:36:41,550 --> 01:36:48,270 to an agreement on the budget $321 billion and has reserves of $15.7 billion. 957 01:36:48,270 --> 01:36:54,130 dollars, our priority programs in the GHT reduction fund, which are those tourists 958 01:36:54,130 --> 01:36:59,270 that have been on the top, were maintained after there was some regional concern about 959 01:36:59,270 --> 01:36:59,550 those. 960 01:36:59,670 --> 01:37:04,070 There was cuts originally proposed by the governor, the legislature pushed back and those 961 01:37:04,070 --> 01:37:08,690 ended up coming out much more favorably than we then they might have. 962 01:37:09,050 --> 01:37:13,990 The budget also includes what we've talked about before, which is a $750 million emergency 963 01:37:13,990 --> 01:37:18,850 loan program for the general fund for select barrier transit agencies, including Caltrain. 964 01:37:18,850 --> 01:37:23,790 It's the folks that would receive funding from SB 63 if it were to pass. 965 01:37:24,270 --> 01:37:26,950 The loan would only take effect if SB 63 passes. 966 01:37:28,230 --> 01:37:32,050 And negotiations are ongoing in terms of what the loan terms would be. 967 01:37:33,550 --> 01:37:37,930 When they do come back on the 18th, the legislature is expected to resume discussion on the future 968 01:37:37,930 --> 01:37:39,490 of the cap and trade program. 969 01:37:39,490 --> 01:37:46,070 now it's called cap and invest, and that there are ongoing discussions that we are following 970 01:37:46,690 --> 01:37:51,610 around the region and in Sacramento about the future of that program, and a lot rides on 971 01:37:51,610 --> 01:37:55,250 that being extended and that funding coming to fruition. 972 01:37:58,810 --> 01:38:03,050 In terms of that, there's a CalSTAS, as I think you didn't mention this, CalSTAS transformation 973 01:38:03,050 --> 01:38:08,690 task force meeting on August 1st, and they have a draft report. It has for report for discussion, 974 01:38:08,690 --> 01:38:12,670 and they will deliver their final report on October 30th. 975 01:38:13,870 --> 01:38:17,190 As I mentioned, I'm thinking I'm going to skip over SB 30 real quick and come back to it 976 01:38:17,190 --> 01:38:20,110 since it is an action item and expect there may be some questions 977 01:38:20,650 --> 01:38:25,030 and just clean up the last piece which is SB 63. 978 01:38:26,190 --> 01:38:27,750 I think you're all pretty familiar with this. 979 01:38:28,370 --> 01:38:33,330 Here's a timeline of things that the one I think to focus on or the two are August 6th, 980 01:38:33,410 --> 01:38:36,530 which was yesterday or last night in this very room. 981 01:38:36,530 --> 01:38:41,230 Sam Trans met to discuss whether or not to opt-in and I'm pleased to report that the Sam 982 01:38:41,230 --> 01:38:46,410 Trans Board did degree to opt-in to the measure. 983 01:38:47,030 --> 01:38:52,290 They also voted to instruct the Bay Area Delegation to advance a slightly different expenditure 984 01:38:52,290 --> 01:38:58,530 plan, shifting some money from their municompetribution back to return source to San Mateo. 985 01:39:01,030 --> 01:39:05,590 And I wanted to thank, personally, Emily Beech and Jessica Epstein, and of course, 986 01:39:05,590 --> 01:39:10,530 April, Emily and Jessica did a Yomans work in terms of the staff reports, making sure 987 01:39:10,530 --> 01:39:14,710 all their boards were well informed with information coming over the weekends and in the evenings. 988 01:39:15,650 --> 01:39:20,450 And really, I think did good work that I think will come to the benefit of Bay Area Transit. 989 01:39:21,270 --> 01:39:26,530 The other date there is August 7th, where tonight VTA is going to meet and discuss whether 990 01:39:26,530 --> 01:39:32,010 are not the, they will opt in. I was obviously a big night for transit because this would 991 01:39:32,010 --> 01:39:37,190 be, this would make it a five county measure if VTA does in fact opt in. So if you want 992 01:39:37,190 --> 01:39:41,610 to send a hug emoji or a heart emoji to any of your friends on the VTA board, it might 993 01:39:41,610 --> 01:39:46,950 be a good time. It will be a monumental decision in there. I think a lot of folks' careers 994 01:39:46,950 --> 01:39:52,170 is not often you get to vote on something I think that's important for transit on a transit 995 01:39:52,170 --> 01:39:59,890 report. The staff recommendation from VTA is to opt-in at the rate. 996 01:40:00,000 --> 01:40:29,040 Or oversight body that would be established would be representatives from the tax counties, not MTC as a whole for instance. And they would separately ask the legislature to seek commitments from regional partners and leadership in the legislature to prioritize transportation needs in Santa Clara County for cap and trade and other state funding given Santa Clara County's contributions to CalTrain through SB 63. That's not a condition of opting in as I read the staff recommendation, but it is a request. 997 01:40:29,040 --> 01:40:35,300 just to work on those priorities. 998 01:40:35,960 --> 01:40:38,960 So that's my discussion of SB 63. 999 01:40:40,160 --> 01:40:43,140 I don't know if you want to, Mr. Chair, I want to pause here for questions on that or any 1000 01:40:43,140 --> 01:40:45,140 of the rest of the updates and then take SB 30. 1001 01:40:45,720 --> 01:40:48,500 No, I don't want to talk about this subject ever again. 1002 01:40:51,720 --> 01:40:53,340 Good luck, VTA tonight. 1003 01:40:55,120 --> 01:40:55,660 All right. 1004 01:40:56,000 --> 01:40:57,780 I'm not Mr. Corteszi's bill. 1005 01:40:57,780 --> 01:40:57,880 Bill. 1006 01:40:58,240 --> 01:40:59,280 All right, let's move back to that. 1007 01:40:59,400 --> 01:40:59,780 Thank you. 1008 01:41:01,520 --> 01:41:08,160 So, Senator Cortese's bill, SB 30, we're recommending an oppose unless amended position. 1009 01:41:08,740 --> 01:41:12,500 You'll note this is pretty late in the season for us to be opposing a bill. 1010 01:41:12,680 --> 01:41:18,680 We've done that out of an attempt to work with the authors on this as it made its way through 1011 01:41:18,680 --> 01:41:23,620 the legislature out of the Senate and in the assembly and now it has assembly approaches. 1012 01:41:24,000 --> 01:41:26,560 It's probably its last stop in the legislature. 1013 01:41:26,560 --> 01:41:36,060 We've had some of our Bay Area delegation as some of the errands voted against it. 1014 01:41:36,560 --> 01:41:42,060 Assemblymember Pappin voted to obtain which sort of counts as a no, and the CTA as long 1015 01:41:42,060 --> 01:41:46,480 had an oppose unless amended position in part because the effects that they know 1016 01:41:46,480 --> 01:41:52,840 that this would have on CalTrain, where there's a fair amount of information up there. 1017 01:41:52,840 --> 01:41:53,920 I don't want to read it all for you. 1018 01:41:54,040 --> 01:41:56,400 Essentially, the bill would prevent agencies 1019 01:41:56,400 --> 01:41:59,380 from transferring diesel locomotives 1020 01:41:59,380 --> 01:42:03,360 of tiers zero or one, any tiers below two. 1021 01:42:05,280 --> 01:42:08,660 And it would allow transfer of tiers two and above 1022 01:42:08,660 --> 01:42:12,140 if there was a showing that greenhouse gas 1023 01:42:12,140 --> 01:42:17,300 and emissions would be appropriate, it would be better for that. 1024 01:42:17,520 --> 01:42:21,520 So our essentially asking is for the tier zero and one locomotive 1025 01:42:21,520 --> 01:42:25,600 it's a countering as we have about nine of those locomotives and each of those locomotives 1026 01:42:25,600 --> 01:42:32,040 in fact has been upgraded and it has better emissions than traditional zero and one 1027 01:42:32,040 --> 01:42:37,060 tier locomotives but they keep that tier because the tier is based on one the locomotive is built 1028 01:42:37,060 --> 01:42:43,300 even if you're even if you overall that as we have so we're just asking amendments that would say 1029 01:42:43,300 --> 01:42:48,200 if we can have a positive showing that this actually would be better for the environment to make 1030 01:42:48,200 --> 01:42:53,880 the transfer and that could be showing by the air district or a car that we would be allowed 1031 01:42:53,880 --> 01:42:59,780 to make those transfers. And secondly there's a piece that would allow transfer of diesels to 1032 01:42:59,780 --> 01:43:06,620 museums but that would as currently written would require the engine to be removed. It is I have learned 1033 01:43:06,620 --> 01:43:12,220 a substantial thing to remove an engine from a diesel and also much less attractive to the museums 1034 01:43:12,220 --> 01:43:17,960 because that's a big percentage and a big piece of what a diesel locomotive is. And so we would 1035 01:43:17,960 --> 01:43:23,520 ask that the amendment say that the engine could be disabled rather than fully removed because 1036 01:43:23,520 --> 01:43:27,320 it financially just doesn't make any sense to take the entire engine out and then try 1037 01:43:27,320 --> 01:43:30,880 to transfer it and in fact to move it to a museum. 1038 01:43:31,080 --> 01:43:33,820 So those are the amendments we would look at. 1039 01:43:36,300 --> 01:43:42,000 Here they are up in writing and we'll see if I summarized them correctly and that's why 1040 01:43:42,000 --> 01:43:45,520 we're recommending impose unless amended position. 1041 01:43:45,520 --> 01:43:47,640 This would have real financial implications to CalTrain. 1042 01:43:47,880 --> 01:43:54,460 It would mean several million dollars of our ability to be able to transfer these if we just 1043 01:43:54,460 --> 01:43:57,300 decommissioned them and sold them a scrap for scrap. 1044 01:43:57,400 --> 01:43:58,840 We don't make really much money on scrap. 1045 01:43:58,840 --> 01:44:02,020 It ends up being about a push because it takes a lot to decommission them. 1046 01:44:02,880 --> 01:44:11,460 So this really is a financial piece and that's why we're asking for an opposed unless amended position. 1047 01:44:11,460 --> 01:44:31,970 All right, I do have a couple of questions, and colleagues, my general policy has always been that you should never oppose a bill introduced by a member of your delegation, unless you just really, really, really can't live with it. 1048 01:44:33,230 --> 01:44:42,030 And I believe this bill was generated as a reaction to the transaction we did in Lima, Peru. 1049 01:44:42,030 --> 01:44:51,590 is that correct? Yeah. Yeah. And isn't that transaction done and aren't the vehicles gone? 1050 01:44:52,230 --> 01:44:52,690 Yes. 1051 01:44:55,320 --> 01:44:56,500 That's my understanding. 1052 01:44:57,740 --> 01:44:59,480 We still have some remaining. 1053 01:45:00,000 --> 01:45:00,720 All right, two, so. 1054 01:45:05,860 --> 01:45:13,120 Hold on, let somebody responsible come to the microphone. They were all moved 1055 01:45:13,120 --> 01:45:18,960 to Stockton. We had, yeah, problems with one of the coaches, so we fixed it yesterday 1056 01:45:18,960 --> 01:45:24,580 and UP took it, so we don't have any on our property anymore. Okay, of the Peruvian. And 1057 01:45:24,580 --> 01:45:30,240 just to be clear, the transaction is complete. Lima has title to all of the trains. 1058 01:45:32,900 --> 01:45:33,400 They 1059 01:45:33,400 --> 01:45:34,540 answers to my question. 1060 01:45:34,620 --> 01:45:43,600 I look for the lawyer when you said complete, because in that sense, the big thing is 1061 01:45:44,460 --> 01:45:45,940 to the side now, right? 1062 01:45:46,260 --> 01:45:46,660 It's moved. 1063 01:45:48,180 --> 01:45:53,080 Well, we still have nine engines that are in our position that we're not subject to 1064 01:45:53,080 --> 01:45:57,240 the Peru transaction, including engines that are still running Gilroy's service, as well 1065 01:45:57,240 --> 01:45:57,780 as some of those. 1066 01:45:58,060 --> 01:45:59,220 Those haven't happened yet. 1067 01:45:59,220 --> 01:46:03,160 Right, those are not subject to the proof transaction. 1068 01:46:03,400 --> 01:46:07,700 They are just, have you had any reaction to these two amendments from the author? 1069 01:46:09,060 --> 01:46:17,940 We've, for months, requested that the author make them and we have not gotten any help from them. 1070 01:46:18,900 --> 01:46:24,540 CTA has been, you know, testified in an opposition to the bill and asked for these amendments and the amendments haven't been taken. 1071 01:46:24,540 --> 01:46:31,860 All right. Let me see if there are any other members of the board to the chair. 1072 01:46:32,220 --> 01:46:38,800 I just want to be clear on the agenda that it's informational, but you're asking for action. 1073 01:46:39,940 --> 01:46:43,860 So I want to make sure it actually can be even considered if that's not what is stated. 1074 01:46:44,920 --> 01:46:51,320 Yes, the agenda also notes that all items on the agenda are subject to action by the board. 1075 01:46:51,320 --> 01:47:05,320 So if notwithstanding that reference information rather than motion, the agenda preserves the opportunity for the Board to act and the title of the item does say consideration of position on SB 30, so we've given an appropriate note. 1076 01:47:05,460 --> 01:47:08,400 I'm not the lawyer. I just wanted to check. I appreciate my cheek. Thank you. 1077 01:47:08,580 --> 01:47:08,840 Thank you. 1078 01:47:08,840 --> 01:47:09,380 Keep it as honest. 1079 01:47:10,460 --> 01:47:12,440 Anyone else? Director Abbey Koga. 1080 01:47:13,000 --> 01:47:20,020 Thank you, Chair. I am in alignment with your comments and I was going to suggest rather than oppose 1081 01:47:20,020 --> 01:47:24,140 the less amended a support if amended position. 1082 01:47:27,440 --> 01:47:30,000 So that's another way of getting at the objective. 1083 01:47:33,020 --> 01:47:36,140 Colleagues, any other comments or discussion? 1084 01:47:37,900 --> 01:47:40,680 Mr. Chairman, I'm in the same flavor. 1085 01:47:41,040 --> 01:47:42,760 You know, when you have a member of your delegation, 1086 01:47:43,240 --> 01:47:46,460 it's very severe to use the word, 1087 01:47:47,240 --> 01:47:50,220 so support if amended is appropriate. 1088 01:47:52,540 --> 01:47:53,500 All right. 1089 01:47:54,840 --> 01:47:56,700 Any public comment on this? 1090 01:47:57,620 --> 01:47:59,560 We do have virtual hands raised. 1091 01:48:00,080 --> 01:48:01,500 First person is Alita Dupree? 1092 01:48:05,700 --> 01:48:08,140 Thanks again, Chair Steve Hammigard, members. 1093 01:48:08,480 --> 01:48:10,700 Alita Dupree for the record. She and her with team polls. 1094 01:48:11,620 --> 01:48:13,860 I have a problem with this bill. 1095 01:48:15,040 --> 01:48:18,100 And I'm not really seeing the rationale of this bill 1096 01:48:18,100 --> 01:48:26,580 in restraining transit agencies from being able to appropriately dispose of their equipment. 1097 01:48:27,820 --> 01:48:34,540 And I'm looking forward to seeing what Lima Peru is going to do in building their commuter rail. 1098 01:48:35,040 --> 01:48:37,560 I'm sure it's going to take a lot of cars off the road. 1099 01:48:39,100 --> 01:48:41,180 We don't live in a perfect world. 1100 01:48:41,180 --> 01:48:53,500 and these locomotives represent stranded capital, and in a day and age when public 1101 01:48:53,500 --> 01:49:00,740 transportation needs all the money it can get, we have to be able to transact 1102 01:49:00,740 --> 01:49:09,280 business appropriately. We don't want to throw money away. Yes, these locomotives 1103 01:49:09,280 --> 01:49:14,640 do produce emissions. And until they're at the end of their useful life, they're going 1104 01:49:14,640 --> 01:49:24,040 to produce emissions. Unless somebody, the state, et cetera, is willing to pay caltrain 1105 01:49:24,040 --> 01:49:32,280 and equivalent amount of what they can get to dispose of these locomotives. And caltrain 1106 01:49:32,280 --> 01:49:39,640 should be able to dispose of them appropriately. So yes, ideally, I would like to see us remove 1107 01:49:39,640 --> 01:49:47,760 a mission-producing equipment from the community. But the fact is that's not going to happen today, 1108 01:49:47,940 --> 01:49:53,600 and it's not going to happen tomorrow, just as we can't expect people who trade in their cars to 1109 01:49:53,600 --> 01:49:59,920 simply throw them away. They get a trade-in value with the dealer, and yes, people are still trading 1110 01:50:00,000 --> 01:50:18,230 And gas lean cars for new gasoline cars. And this bill doesn't apply to freight railroads. So I can't support this bill. And I think it should, it should be opposed regardless of where you live. Thank you. Next public commenter of Adina Levin. 1111 01:50:21,680 --> 01:50:31,620 Yes. So I am glad to see Caltrain paying some attention to this bill. 1112 01:50:31,620 --> 01:50:44,220 So, the CalTrain has just electrified the portion of the line from Tamion to San Francisco, 1113 01:50:44,740 --> 01:50:49,560 but as the staff have mentioned, there's still the diesel trains serving the Gilroy service. 1114 01:50:50,180 --> 01:50:55,880 And in the state of California overall, what CalTrain has done is 50 miles out of a 1,500 1115 01:50:55,880 --> 01:51:04,960 mild program of electrification in the state, and the amendments being proposed to assure 1116 01:51:04,960 --> 01:51:12,020 that if a diesel train is being moved somewhere, we're having a train would reduce emissions 1117 01:51:12,020 --> 01:51:18,600 compared to other forms of transportation. That seems like a sensible way of handling that. 1118 01:51:18,600 --> 01:51:27,460 that during this legislative session, the Senator Cortesian is role and Senate transportation 1119 01:51:27,460 --> 01:51:41,340 has played a key role in SB 63, VTA's decision tonight will go a long way towards settling 1120 01:51:41,340 --> 01:51:52,340 out where the county is on that and I do think that, you know, even at this hour pushing for 1121 01:51:52,340 --> 01:51:59,820 this bill to be made more constructive will be helpful not only for CalTrain, but for the rest 1122 01:51:59,820 --> 01:52:07,000 of the 1500 miles of electrification needed in the state of California that can build on CalTrain's 1123 01:52:07,000 --> 01:52:10,660 good example. Thank you. Next speaker is Roland. 1124 01:52:13,500 --> 01:52:18,820 Thank you. So on SB 30 absolutely support 1125 01:52:18,820 --> 01:52:26,320 and less amended but I want to talk about the $75 million folk out training in SB 63. 1126 01:52:27,280 --> 01:52:36,380 I would like this bold to make it very clear to answer Clara County that this $75 million 1127 01:52:36,380 --> 01:52:41,320 does not repeat, does not include the cost of the 1128 01:52:41,320 --> 01:52:44,040 giro extension, which includes health and 1129 01:52:44,040 --> 01:52:47,480 other wear li. Then the question comes to 1130 01:52:47,480 --> 01:52:50,860 great, so how we're going to finance and grow 1131 01:52:50,860 --> 01:52:53,060 the ridership. In that extension, quite 1132 01:52:53,060 --> 01:52:55,560 frankly, San Francisco to giro should be 1133 01:52:55,560 --> 01:52:59,000 one line end of discussion. The best 1134 01:52:59,000 --> 01:53:02,280 solution is to follow the French example who 1135 01:53:02,280 --> 01:53:05,360 turned the entire freeway network over to 1136 01:53:05,360 --> 01:53:13,000 the private sector that releases, and they use the least revenues to finance the development 1137 01:53:13,000 --> 01:53:15,740 of the high-speed rail network. 1138 01:53:17,020 --> 01:53:24,920 And we have got a similar situation between San Jose and Giroi, because we are about 1139 01:53:25,220 --> 01:53:33,760 to start funding the development of express lanes between North Morgan Hill and Giroi. 1140 01:53:33,760 --> 01:53:41,700 And we have to make sure at a regional level, I mean at a regional level, that should 1141 01:53:41,700 --> 01:53:49,640 this come to pass, is that all the revenue from these express lanes stayed within the corridor 1142 01:53:49,640 --> 01:53:56,240 and does not get shifted to some other mega project in another part of Santa Clara County. 1143 01:53:56,880 --> 01:54:02,800 And if we do this, everybody will be in support because we're not increasing taxes. 1144 01:54:02,800 --> 01:54:09,680 We're following the French. We're following the Japanese model is to basically use their 1145 01:54:09,680 --> 01:54:14,980 Instagram news and keep it there within the code scope on which you want to tend it and 1146 01:54:14,980 --> 01:54:19,700 give people a choice whether they drive or they like out frame. Thank you. 1147 01:54:19,760 --> 01:54:22,340 Last speaker is Adrian Brandt. 1148 01:55:00,000 --> 01:55:28,640 I just wanted to point out that there are numerous YouTube videos showing our equipment down in Lima, and there's considerable political jockey and going on down there on how to get those trains into service as soon as possible. And so that I also want to, you know, really align myself with the Dino's comments. I think on a state level, it's going to be really important that other, you know, 1149 01:55:28,640 --> 01:55:31,420 in support of other electrification throughout the state, 1150 01:55:31,980 --> 01:55:34,780 that commuter rail and other agencies like ours 1151 01:55:34,780 --> 01:55:37,980 are able to, if there is justification, 1152 01:55:38,460 --> 01:55:40,640 as it says in the staff recommendation, 1153 01:55:41,300 --> 01:55:43,940 if there's justification on a pollution basis, 1154 01:55:44,480 --> 01:55:49,340 that we and other agencies are able to monetize 1155 01:55:49,960 --> 01:55:53,600 and more easily and more environmentally, in fact, 1156 01:55:54,060 --> 01:55:57,960 pass on their no longer needed locomotives. 1157 01:55:57,960 --> 01:56:05,960 So, I think it's really very odd, just as a comment that Mr. Cortese's bill does not affect 1158 01:56:05,960 --> 01:56:12,560 freight railroads when they are, by far, a much, much larger source of locomotive pollution. 1159 01:56:12,920 --> 01:56:16,260 So that's a real head scratcher, but that's not our business. 1160 01:56:16,520 --> 01:56:16,820 Thank you. 1161 01:56:18,360 --> 01:56:19,900 That ends public comments. 1162 01:56:20,240 --> 01:56:23,500 We do have Devon Ryan online and with her hand raised. 1163 01:56:24,920 --> 01:56:25,120 But. 1164 01:56:25,560 --> 01:56:25,800 Staff. 1165 01:56:26,880 --> 01:56:41,980 Mr. Chair, I think we can, that may be from an earlier hand raise, I think, I just do want to make sure that the recommendation makes sense because we still at least would have a position on the bill and have a formal position in terms of amendments. 1166 01:56:41,980 --> 01:56:46,700 I want to make clear the board is aware that over time we think this would cost us in 1167 01:56:46,700 --> 01:56:51,440 terms of opportunity costs in terms of things we couldn't sell in the range of $20 million. 1168 01:56:51,880 --> 01:56:55,140 So I just wanted to put that on the record so that you all know, or if you see Senator 1169 01:56:55,140 --> 01:57:01,960 Courtais in the hall, you can mention our current fiscal situation and that that's not an easy 1170 01:57:01,960 --> 01:57:04,880 hit even if it's over a reasonably amount of time. 1171 01:57:05,540 --> 01:57:06,380 Director Burke. 1172 01:57:07,280 --> 01:57:07,440 Yeah. 1173 01:57:08,560 --> 01:57:18,720 Have we had any success in enlisting our other local legislators to lobby Senator Cortesia 1174 01:57:18,720 --> 01:57:19,260 on our behalf? 1175 01:57:19,920 --> 01:57:25,620 You know, our legislators, Patrick Carrons, who pursuant to the previous conversation 1176 01:57:25,620 --> 01:57:30,080 came from Community College and now is district and now is on the assembly transportation. 1177 01:57:30,540 --> 01:57:34,280 So maybe he'll be the solution to some of our previous speaker's issues, voted no on 1178 01:57:34,280 --> 01:57:39,840 this bill and because of the concerns from CalTrain and Assemblymember Papin, like I said, 1179 01:57:40,020 --> 01:57:40,340 abstained. 1180 01:57:40,600 --> 01:57:42,620 And I know that they've had discussions with Senator Cortese. 1181 01:57:43,280 --> 01:57:48,060 We've met with Senator Cortese's staff several times offered to me with him in person, but 1182 01:57:48,060 --> 01:57:49,460 just not had much luck. 1183 01:57:50,820 --> 01:57:55,420 Over time, he has accepted amendments, and so the bill didn't start out with all the tears 1184 01:57:55,420 --> 01:58:02,560 being able to be transferred with a GHG and emissions showing, but it didn't get down 1185 01:58:02,560 --> 01:58:04,360 of the ones we own, the nine. 1186 01:58:04,560 --> 01:58:07,160 Senator Maxker, have we engaged with him? 1187 01:58:09,080 --> 01:58:15,580 We've engaged with all of our, it's been a little while, because we've been doing this for a long time since the bill started in the Senate. 1188 01:58:16,280 --> 01:58:28,280 With every member of our delegation, I think we've informed about this bill, informed about CalTransition, that it would cost us a fair amount of money, and that we were just asking to have same showing that other tier locomotives could have. 1189 01:58:28,540 --> 01:58:28,800 Thank you. 1190 01:58:29,380 --> 01:58:30,200 Thank you for the questions. 1191 01:58:30,200 --> 01:58:43,360 So I believe what I heard is Director Abe Koga making a motion to support the bill if it's amended according to the information in the staff report. 1192 01:58:44,600 --> 01:58:45,960 Is that as is there a second? 1193 01:58:47,340 --> 01:58:47,840 Second. 1194 01:58:48,680 --> 01:58:50,780 Any further discussion or debate? 1195 01:58:51,340 --> 01:58:52,960 Yes, directors Mooda. 1196 01:58:52,960 --> 01:58:58,080 I just have a question in terms of the language here. 1197 01:58:59,540 --> 01:59:04,080 Unless amended, how do we state exactly how? 1198 01:59:06,020 --> 01:59:10,200 Yeah, there were two amendments on the thing. 1199 01:59:12,760 --> 01:59:14,820 Why don't we just get the screen? 1200 01:59:16,180 --> 01:59:17,040 There we go. 1201 01:59:18,720 --> 01:59:20,100 So there's two bullet points there. 1202 01:59:22,790 --> 01:59:39,930 Okay, fine. Thank you. All righty. Let's vote. All the roll, please. Director Abikoka. Hi. Director Bert. Yes. Director Cohen. Hi. Director G. Yes. Director Walton. Director Zemuda. Hi. Vice-Chimadina. Yes. Chair Hemminger. Hi. Motion passes. 1203 01:59:41,290 --> 01:59:47,490 Marvellous. We've got one more item here and that's a bunch of verbal reports which I will ask our 1204 01:59:47,490 --> 01:59:54,830 speakers to give quickly. 12A is the Citizens Advisory Committee, Mr. Brant. 1205 01:59:58,590 --> 01:59:59,190 There I am. 1206 02:00:00,000 --> 02:00:29,980 There I am. Yes, so staff did cancel our meeting. So we don't have a meeting to report on. I was somewhat disappointed because I think, you know, they stated that there were no staff available to give us presentations, but I feel that we have a lot to offer in our value goes well beyond the staff presentation. So I'm hopeful that we can avoid a surprise cancellations and still perform a good role in terms of feedback and interacting with staff on issues that 1207 02:00:29,980 --> 02:00:33,940 that occur whether other staff run vacation or not. 1208 02:00:34,400 --> 02:00:34,680 Thank you. 1209 02:00:37,330 --> 02:00:38,210 Thank you. 1210 02:00:38,590 --> 02:00:41,510 12B is me and I don't have a report. 1211 02:00:41,850 --> 02:00:45,830 So 12C is the local policy maker group director Burke. 1212 02:00:46,710 --> 02:00:50,070 We also did not have a meeting in July. 1213 02:00:51,190 --> 02:00:55,430 And we don't have one, let's see, the next one scheduled 1214 02:00:55,430 --> 02:00:57,610 for trying to remember it. 1215 02:00:58,010 --> 02:00:58,590 End of this month. 1216 02:00:58,590 --> 02:01:05,450 But I will say that Peter Rogoff's presentation, even though we may not be able to get him to 1217 02:01:05,450 --> 02:01:11,690 make that presentation, as staff providing that may be of interest to the city's up and 1218 02:01:11,690 --> 02:01:14,830 down the corridor, as they're struggling with grade separation issues. 1219 02:01:18,390 --> 02:01:18,850 That it? 1220 02:01:22,210 --> 02:01:30,430 Director Ovee has fled the building, so we will not get a TJPA report just as well, perhaps. 1221 02:01:30,430 --> 02:01:37,530 item 13 is for respondents yes we have public comment we have public comment on 1222 02:01:37,530 --> 02:01:45,450 the public comment okay virtual handraises Roland there were essentially no 1223 02:01:45,450 --> 02:01:54,030 reports given but go ahead I agree but I would like to make a suggestion is that 1224 02:01:54,030 --> 02:02:02,350 But when they are not available to make presentations, it's an opportunity for you to make it possible 1225 02:02:02,350 --> 02:02:11,030 for members of the public to give presentations such as great crossing and answering new construction 1226 02:02:11,030 --> 02:02:21,350 techniques, various ways that the Bureau of Extension could both be built, doing all the 1227 02:02:21,350 --> 02:02:26,310 industry capital projects and how I could be funded. Thank you. 1228 02:02:26,610 --> 02:02:28,110 That ends public comments. 1229 02:02:28,590 --> 02:02:31,550 All right. So back to correspondence which