1 00:00:04,480 --> 00:00:10,480 Today is August 20th. This is a meeting of the 350 Midell affordable housing 2 00:00:08,559 --> 00:00:13,599 project subcommittee. Often we have our subcommittees meet upstairs, but because 3 00:00:12,240 --> 00:00:16,560 we knew we'd have a lot of folks here, we knew we'd be more comfortable in the 4 00:00:15,440 --> 00:00:20,560 chamber. So, it's a little bit more formal than we have for some committees, 5 00:00:18,800 --> 00:00:24,720 but uh it definitely serves what we're going to be doing today. So, I'm calling 6 00:00:22,240 --> 00:00:28,240 the meeting to order. As we uh before we start any meeting, we like open time for 7 00:00:26,320 --> 00:00:30,800 public expression. This is anything not on today's agenda. you have the 8 00:00:29,679 --> 00:00:35,280 opportunity to share with the subcommittee if you'd like to do that. 9 00:00:32,559 --> 00:00:40,000 Now is your opportunity to do so. If it's not on the agenda, 10 00:00:38,480 --> 00:00:42,800 okay, if it's not about anything that we're talking about and you're welcome, 11 00:00:41,360 --> 00:00:48,920 but not required to say your name and what part of Sanfell you're in and you 12 00:00:45,600 --> 00:00:48,920 have two minutes. 13 00:00:50,480 --> 00:00:57,039 » Good evening. I'm Gregory Andrew from Sarfell Meadows and I want to talk about 14 00:00:54,160 --> 00:01:02,160 the u make a comment about the timing of the posting of this meeting which is not 15 00:00:59,359 --> 00:01:08,560 on the agenda and that is to just let you know that 16 00:01:04,640 --> 00:01:14,320 uh to not have posted it on Friday when meetings are normally posted which we 17 00:01:11,119 --> 00:01:21,040 were looking for and to not get that posting until Monday is a tactic that 18 00:01:18,320 --> 00:01:24,799 does not build trust with us in the neighborhood. Several of us commented, 19 00:01:22,560 --> 00:01:30,240 "Why would they wait?" They knew this meeting was coming. It wasn't because 20 00:01:27,200 --> 00:01:37,200 it's summer and there seemed to have been a deliberate decision to postpone 21 00:01:34,960 --> 00:01:41,520 the noticeifica notification of this meeting. Now, you did it certainly 22 00:01:39,600 --> 00:01:47,600 within uh what you're allowed to do within the Brown Act, but I want to let 23 00:01:43,920 --> 00:01:52,640 you know that that approach is not a good way to build trust with us who have 24 00:01:49,759 --> 00:01:59,280 been engaged with you and following this and looking to get more confidence and 25 00:01:56,640 --> 00:02:06,079 more trust from you about your whole approach to uh this particular project. 26 00:02:03,759 --> 00:02:10,399 So, that's my comment. Thank you. I'm so glad they were able to make it even with 27 00:02:07,759 --> 00:02:16,160 the less than ideal from your perspective um noticing. Anyone else 28 00:02:13,360 --> 00:02:21,440 like to comment? Not seeing any other public comment. Uh we will get right 29 00:02:18,400 --> 00:02:25,920 into it because we have a big agenda even though it looks like it's only one 30 00:02:22,800 --> 00:02:30,319 item. So we will be discussing initial summary and discussion of responses for 31 00:02:27,680 --> 00:02:34,720 RFP which is request for proposals for the development of new affordable 32 00:02:31,520 --> 00:02:38,400 housing at 350 Maryale Road. And I'm going to turn it over to looks like 33 00:02:36,160 --> 00:02:43,151 Alexis and Greg. Oh, director Hinkle, the whole team. Okay. 34 00:02:41,131 --> 00:02:43,151 [snorts] 35 00:02:48,720 --> 00:02:54,640 Thank you. Good evening, mayor and council member. I'm Alexis Caption, 36 00:02:53,120 --> 00:02:58,800 housing manager for the city, and I'm here with assistant director Greg Miner 37 00:02:56,480 --> 00:03:03,440 and director Micah Hingle to present responses to the request for proposals 38 00:03:00,959 --> 00:03:07,959 or RFP for the development of affordable housing at 350 Midale Road. 39 00:03:08,159 --> 00:03:14,560 The purpose of this study session is to provide a summary of the top responses 40 00:03:11,920 --> 00:03:18,080 to the RFP and to receive feedback on the application of the selection 41 00:03:16,080 --> 00:03:24,080 criteria to inform staff's recommendation to the full city council. 42 00:03:22,239 --> 00:03:28,879 We'll start with brief background on the city's housing landscape. We'll review 43 00:03:26,560 --> 00:03:34,319 the 350 Midel acquisition and grant requirements, provide an overview of the 44 00:03:31,040 --> 00:03:37,599 RFP, and outline next steps. Following staff's presentation, we will hand it 45 00:03:35,920 --> 00:03:42,840 off to the development teams to provide brief presentations on their respective 46 00:03:39,840 --> 00:03:42,840 proposals. 47 00:03:43,280 --> 00:03:48,640 So, a little bit of background on where we are with housing in Sanfell and 48 00:03:46,480 --> 00:03:53,120 Marin. are in a constrained housing market in part because as you can see in 49 00:03:51,440 --> 00:03:57,439 this graph while the population of San Rafll continued to grow over the last 50 00:03:54,879 --> 00:04:02,080 several several decades construction dwindled. 51 00:03:59,920 --> 00:04:06,159 Limited supply has contributed to a lack of affordable housing and resulted in 52 00:04:04,319 --> 00:04:10,319 Marin being the second most expensive metropolitan area in the United States 53 00:04:08,239 --> 00:04:13,920 with the third highest median rent in California. 54 00:04:11,920 --> 00:04:18,880 Increases in housing costs have far outpaced wage growth. So that more more 55 00:04:16,880 --> 00:04:23,600 than four in 10 households in Marin qualify as low income. And the folks who 56 00:04:21,759 --> 00:04:28,320 are low income are the same people that provide critical services and make our 57 00:04:26,080 --> 00:04:32,400 community run. For example, based on their average 58 00:04:29,759 --> 00:04:36,400 salaries in 2025, home health aids fall into the extremely lowincome bracket. 59 00:04:34,639 --> 00:04:42,320 Preschool teachers are very low income and paramedics are low income. 60 00:04:39,759 --> 00:04:46,400 Not having affordable housing has qu uh enough affordable housing has 61 00:04:43,600 --> 00:04:50,880 consequences including homelessness, overcrowding and displacement, 62 00:04:48,960 --> 00:04:54,720 rent burden and severe rent burden, meaning households are spending more 63 00:04:52,160 --> 00:04:58,639 than 30% or more than 50% of their income on housing. And they may have to 64 00:04:56,960 --> 00:05:04,639 choose between paying rent and other necessities such as food and medication. 65 00:05:02,479 --> 00:05:08,800 Not enough affordable housing in Marin contributes to workforce shortages and 66 00:05:06,960 --> 00:05:13,120 means that workers have to commute from out of county, contributing to pollution 67 00:05:10,720 --> 00:05:17,759 and environmental impacts. We are also seeing a distortion of the 68 00:05:15,120 --> 00:05:22,240 county's population pyramid shown here with a deficit of working age adults and 69 00:05:20,240 --> 00:05:26,800 young families. And finally, we continue to see racial 70 00:05:24,240 --> 00:05:30,080 disparities across multiple indicators with black and Latino households 71 00:05:28,560 --> 00:05:34,800 experiencing higher levels of rent burden and lower rates of home 72 00:05:32,080 --> 00:05:38,720 ownership. For example, understanding these impacts and that 73 00:05:36,880 --> 00:05:43,120 affordable housing is important for the economic and cultural vitality of San 74 00:05:40,880 --> 00:05:46,880 Rafale, the city council adopted the following housing and homelessness 75 00:05:44,639 --> 00:05:52,080 priorities in their three-year strategic plan, including to facilitate new 76 00:05:49,360 --> 00:05:56,720 housing development, assist in ensuring housing stability, support a housing 77 00:05:54,800 --> 00:06:01,360 first model, and implement strategies that reduce homelessness. The project 78 00:05:59,360 --> 00:06:05,759 that we're about to discuss is grounded in these established priorities. I'll 79 00:06:03,919 --> 00:06:10,720 now hand it off to Greg to talk about 350 Midale. 80 00:06:08,400 --> 00:06:15,280 » All right. Good evening. Um, so in further in in furtherance of the the 81 00:06:13,520 --> 00:06:19,759 goals adopted by city council with respect to housing back in November, as 82 00:06:17,520 --> 00:06:26,000 the the subcommittee members are are well aware, the city acquired 350 Midale 83 00:06:22,479 --> 00:06:30,400 Road, a 2.5 acre property um shown here on the slide from a satellite view 84 00:06:28,080 --> 00:06:35,759 perspective. Um, thanks to funding from the county of Marin. Uh, the site itself 85 00:06:33,520 --> 00:06:40,080 was last used as an adult school. You can see three white structures in a 86 00:06:37,680 --> 00:06:45,520 surface parking lot. Uh it's bordered on the east by the 101 freeway. Uh to the 87 00:06:43,199 --> 00:06:51,039 north or above this picture, you have the smart station nearby and then you 88 00:06:47,840 --> 00:06:55,280 have residential uses to the to the west and a combination of residential 89 00:06:52,880 --> 00:07:00,800 commercial to the south. Uh the funding that the county provided 90 00:06:58,240 --> 00:07:05,919 came as part of a grant agreement uh entered into between the city and 91 00:07:02,720 --> 00:07:10,160 county. And with respect to Oh, I'm sorry. I glossed over the fact that this 92 00:07:07,520 --> 00:07:14,479 is a a two-phase project as part of the the uh collaboration with the county. 93 00:07:12,319 --> 00:07:18,560 The first phase being an interim shelter for unhoused individuals and the second 94 00:07:16,400 --> 00:07:22,080 phase being what we're discussing uh tonight, the permanent affordable 95 00:07:20,319 --> 00:07:26,240 housing development of at least 80 units. Um so in terms of the grant 96 00:07:24,560 --> 00:07:30,560 agreements requirements for this phase of the project, uh the grant agreement 97 00:07:28,560 --> 00:07:36,639 requires that the city must entitle the site for at least 80 housing units by 98 00:07:33,039 --> 00:07:42,160 the end of June 2028. It also requires that the incomes of the tenants may not 99 00:07:39,520 --> 00:07:47,039 exceed 80% of the area median median income. And just for a little 100 00:07:43,759 --> 00:07:51,599 perspective, we provided what that 80% of AMI means for a fourperson household 101 00:07:49,599 --> 00:07:56,080 here on the slide. And in terms of consequences, should the 102 00:07:53,599 --> 00:08:02,879 city fail to entitle 80 units, the city would be liable for $100,000 for every 103 00:07:58,800 --> 00:08:07,520 unit not entitled beyond u short of the 80 units. 104 00:08:05,039 --> 00:08:13,280 So, as a first step towards realizing this vision, staff released a request 105 00:08:09,759 --> 00:08:16,639 for proposals this spring to identify a developing an affordable housing 106 00:08:14,720 --> 00:08:22,400 developer that could help realize this vision. 107 00:08:18,319 --> 00:08:27,039 The RFP asked uh respondents to provide a number of 108 00:08:24,639 --> 00:08:30,879 um components as part of their proposal, including an overview of their proposal, 109 00:08:29,120 --> 00:08:35,519 such as their their vision, the site design, the affordability levels, 110 00:08:33,360 --> 00:08:39,760 services plan, and their development timeline. Additionally, information was 111 00:08:38,320 --> 00:08:43,680 requested about their teams and qualifications, the experience of their 112 00:08:41,519 --> 00:08:48,720 organization, and those working on the project, followed by information on 113 00:08:46,320 --> 00:08:53,040 their project financials, such as a pro-forma, information on their 114 00:08:50,800 --> 00:08:58,320 pre-development financing strategy, operating budget, proposed purchase or 115 00:08:55,519 --> 00:09:03,120 ground lease. And finally, information was requested regarding the financial 116 00:09:00,399 --> 00:09:06,959 capacity of each developing team s and which required financial statements from 117 00:09:04,959 --> 00:09:11,200 their most recent calendar or fiscal year as well as letters from the 118 00:09:09,040 --> 00:09:16,640 developers lenders attesting to their capacity to undertake this project. Um 119 00:09:14,080 --> 00:09:20,959 once the responses were received, a panel of city and county staff as well 120 00:09:19,360 --> 00:09:26,080 as a representative of the chamber of commerce independently reviewed and 121 00:09:23,440 --> 00:09:30,640 scored the proposals received based on the criteria that you see outlined on 122 00:09:28,080 --> 00:09:35,360 the screen. Um in terms of the responses received, 123 00:09:33,279 --> 00:09:41,680 there was uh there was a total of five responses altogether. The scoring across 124 00:09:39,279 --> 00:09:47,040 all panel members identified three strong uh candidates in EA, Eden and 125 00:09:45,519 --> 00:09:52,640 Saha. Across the while there were some uh 126 00:09:49,760 --> 00:09:56,720 unique components to each proposal there was a lot of similarities as well which 127 00:09:54,720 --> 00:10:01,279 was actually a good thing in the sense that all three provided commitments to 128 00:09:58,959 --> 00:10:06,000 covering pre-development costs. All three identified funding strategies that 129 00:10:04,080 --> 00:10:11,360 utilize state grants and federal tax credits. They all provided for community 130 00:10:08,240 --> 00:10:15,279 engagement as part of their proposal. They all provided a timeline that met 131 00:10:13,519 --> 00:10:21,200 the city and county's grant agreements of entitling at least 80 units by the 132 00:10:17,760 --> 00:10:26,880 end of June 2028. They all identified services for future residents. They all 133 00:10:24,800 --> 00:10:31,519 contain a mixture of unit types, including threebedroom units for 134 00:10:28,560 --> 00:10:37,360 families, and they all propose leasing the property for 99 years for $1 135 00:10:33,760 --> 00:10:41,519 annually. Um, all al all all that said, there were a couple differences as I 136 00:10:39,200 --> 00:10:45,040 alluded to a moment ago, including the number of units being proposed, the 137 00:10:43,360 --> 00:10:49,200 amount of parking provided, and neighborhood improvements. 138 00:10:47,120 --> 00:10:54,320 And those uh differences and some of those similarities are outlined here in 139 00:10:51,040 --> 00:11:00,320 this uh summary table. So for example, EAH um of the three uh candidates is 140 00:10:58,160 --> 00:11:06,399 proposing the lowest number of units and so understandably also the the shortest 141 00:11:03,680 --> 00:11:10,800 structure, a three-story structure. Um they are providing they also are 142 00:11:08,560 --> 00:11:17,600 offering to provide the lowest average affordability level of 45% and the 143 00:11:14,320 --> 00:11:23,200 lowest per unit cost. Um, in contrast, Eden is proposing the uh greatest number 144 00:11:20,800 --> 00:11:27,920 of housing units as well as the highest structure. Um, they're also proposing 145 00:11:25,680 --> 00:11:34,560 the largest amount of parking spaces per unit. And then they're and the most 146 00:11:30,320 --> 00:11:38,720 costly per unit um proposal. In terms of affordability level, Eden and Saha are 147 00:11:36,720 --> 00:11:46,000 proposing the same average affordability level. Um lastly, Saha is proposing uh a 148 00:11:43,440 --> 00:11:50,640 level of units and stories that falls in between the EAH and Eden proposals um 149 00:11:48,800 --> 00:11:57,680 while providing the the lowest number of parking spaces per unit. 150 00:11:54,480 --> 00:12:03,120 Um so in the end Eden did score the highest um by the the average of panel 151 00:12:00,959 --> 00:12:08,720 scores but they were followed closely by EAH and SAHA and ultimately all three 152 00:12:06,240 --> 00:12:12,800 are qualified to sati satisfy the city county's grant requirements and we feel 153 00:12:10,720 --> 00:12:19,279 lucky to have such strong respondents to our RFP. Um, at the same time, Eden's 154 00:12:16,800 --> 00:12:23,519 proposal offers the most housing, the most parking, and it included 155 00:12:21,839 --> 00:12:28,320 neighborhood improvements such as facilitating a permanent pedestrian 156 00:12:25,360 --> 00:12:33,600 bicycle path or or an official pedestrian and bicycle path 157 00:12:30,880 --> 00:12:39,600 between uh the 350 Midale site and the Midale community in the Smart Station. 158 00:12:36,240 --> 00:12:45,760 Um, and when we considered both the need for more housing, as 159 00:12:41,920 --> 00:12:50,560 Alexis described, the rare opportunity that we have before us with this uh 160 00:12:48,240 --> 00:12:54,560 sizable site, and the fact that the city's going to invest time and 161 00:12:52,000 --> 00:12:58,800 resources, whether or not we entitle 80 units or more than 80 units, these are 162 00:12:57,200 --> 00:13:05,680 some of the compelling factors that led the panel to um score Eden the highest. 163 00:13:03,600 --> 00:13:11,440 Um I will wrap up with just highlighting some next steps. This is this slide just 164 00:13:08,720 --> 00:13:16,079 kind of provides like a a general um overview of where 165 00:13:13,760 --> 00:13:22,560 the journey that we're going to be um commencing in terms of uh the steps 166 00:13:19,600 --> 00:13:29,440 needed to actually finalizing uh the housing and and leasing the site. The 167 00:13:26,000 --> 00:13:34,399 top half of this timeline identifies milestones related to the permanent 168 00:13:31,760 --> 00:13:39,519 affordable housing project and below are milestones related to the interim 169 00:13:35,920 --> 00:13:43,440 shelter. We're still in the very first milestone, the top left and today marks 170 00:13:41,920 --> 00:13:49,920 really just the beginning of that process of selecting a developer. Um 171 00:13:46,240 --> 00:13:53,839 hopefully uh after today's discussion staff will be in a position to present a 172 00:13:51,680 --> 00:13:57,760 recommendation to the full council to enter into an exclusive negotiating 173 00:13:55,440 --> 00:14:04,079 agreement and we'll be able to come to terms with the developer and uh move 174 00:14:00,800 --> 00:14:10,320 along this this process. And then for those interested in staying um a breast 175 00:14:07,040 --> 00:14:14,560 of this project and all the developments that uh including the next council 176 00:14:12,240 --> 00:14:20,800 meeting, this is the project web page here. And there's also the QR code that 177 00:14:17,199 --> 00:14:26,160 you can uh use to locate this web page. You can sign up for email updates um and 178 00:14:23,920 --> 00:14:32,880 news posts related to this. So if you're interested in staying up to date um this 179 00:14:29,120 --> 00:14:36,000 is the the place to go. So with that, if there's any more questions, if there are 180 00:14:34,639 --> 00:14:40,880 any questions for staff, we're happy to answer that. Um if not, as Alexis 181 00:14:38,480 --> 00:14:45,199 mentioned, the the three developer teams are ready to present and um we can hand 182 00:14:43,680 --> 00:14:47,920 it off to the presenters. >> And before [clears throat] we end on 183 00:14:46,399 --> 00:14:50,480 that and trans transfer over the development teams, one point of 184 00:14:49,360 --> 00:14:55,600 clarification want to really make tonight is this is really not selecting 185 00:14:52,480 --> 00:14:58,800 a project. Um, in essence, if you talk to these development teams, they can do 186 00:14:57,040 --> 00:15:03,360 all three of these projects in independently, but really that's their 187 00:15:01,040 --> 00:15:07,360 vision approach that when based on the input of our RFP, that's what they 188 00:15:05,279 --> 00:15:10,720 basically called out themselves. But really tonight is just to select the 189 00:15:08,800 --> 00:15:14,320 developer that'll actually be the city's partner in this. And then the project 190 00:15:12,240 --> 00:15:22,160 will actually be better defined through the process of due diligence and uh 191 00:15:16,720 --> 00:15:24,800 community input along with um the um uh exclusive negotiated rights agreement. 192 00:15:23,760 --> 00:15:28,240 There's a lot of other factors need to come play. That's why we're really on 193 00:15:26,000 --> 00:15:32,639 the early first phases of this, but this is just an indication of really what the 194 00:15:29,839 --> 00:15:37,279 developers um team saw within this site for themselves. So just want to make 195 00:15:34,079 --> 00:15:41,680 that point of clarification. >> Thank you. Any questions? 196 00:15:39,920 --> 00:15:47,199 » Yeah, go ahead. Just a couple quick questions. Um, 197 00:15:45,120 --> 00:15:50,880 it doesn't say in here anywhere, but I understand that all of these units will 198 00:15:49,279 --> 00:15:54,560 be rental units and none of these are anticipated to be sold. Is that correct? 199 00:15:53,279 --> 00:15:59,199 » Yes, that is correct. >> Okay. Building on that then um when you 200 00:15:57,360 --> 00:16:04,160 did your financial analysis the proformas was it focused just on the 201 00:16:02,000 --> 00:16:10,240 capital outlay necessary to get the building built or was there also a sort 202 00:16:06,639 --> 00:16:13,240 of operating proforma for the decades to come. 203 00:16:14,639 --> 00:16:21,040 » I mean my recollection has included both the construction and ongoing operations 204 00:16:19,279 --> 00:16:23,839 as well as part as part of their proposals. 205 00:16:22,000 --> 00:16:28,560 » Very good. Thank you. >> Thank you. I don't have any additional 206 00:16:25,600 --> 00:16:33,199 questions so we'll go right to it. So the next part is a presentation by 207 00:16:30,399 --> 00:16:37,839 affordable housing developers and it looks like you have slides for 208 00:16:35,199 --> 00:16:42,480 them and I understand it. So >> can I just a point of process so each 209 00:16:39,519 --> 00:16:46,720 fellow hi will have how much time have you allocated each 210 00:16:45,199 --> 00:16:50,000 applicant just so we can I can 211 00:16:48,399 --> 00:16:53,040 » I believe they're prepared to provide a 5 to 10 minute overview and then be 212 00:16:51,759 --> 00:16:58,480 available for questions. >> Okay. And then um EAH was listed first 213 00:16:56,720 --> 00:17:03,680 in our staff report just based on alphabetical order. And so but we defer 214 00:17:02,240 --> 00:17:07,199 to the subcommittee if you there's a specific order that you want to proceed. 215 00:17:05,280 --> 00:17:10,079 » No no this is great and so we'll hear the presentations five to 10 minutes for 216 00:17:08,720 --> 00:17:14,480 each. We'll have questions and then we'll have public comment both questions 217 00:17:11,679 --> 00:17:16,880 and comments and then there might be developers come back up and answer 218 00:17:15,839 --> 00:17:21,439 questions. So >> that sounds great. Um, should I um let 219 00:17:19,520 --> 00:17:23,439 you know when to for the slide or should I do it from 220 00:17:22,000 --> 00:17:27,600 » I think we're sorting through some we're trying to make it full screen. 221 00:17:24,959 --> 00:17:31,200 » Oh, sure. Sure. >> Um, well, while you're doing that, I 222 00:17:29,039 --> 00:17:35,919 guess I'll I'll just start quickly. Um, so good evening. Uh, my name is Nor 223 00:17:33,520 --> 00:17:41,280 Cauer and I had the opportunity to lead the EAH housing uh Maryale proposal. Um, 224 00:17:39,520 --> 00:17:45,280 EAH was really excited for the opportunity to build in our hometown 225 00:17:42,960 --> 00:17:50,320 again. Uh we own and operate 20 properties within 20 minutes of 350 226 00:17:47,280 --> 00:17:54,320 Maryale. So um even just the dozens of community partnerships we've had over 227 00:17:51,840 --> 00:17:57,840 the last you know 55 plus years are really great for us to tap into should 228 00:17:56,160 --> 00:18:02,480 we be able to move forward with with the city on this. Um with me in the audience 229 00:18:00,400 --> 00:18:06,960 I have our EAh development director Daniel Ry um and our architects Sema 230 00:18:05,039 --> 00:18:11,520 Muscar and Justin Wong from Studio Tsquare right here if um you had any 231 00:18:09,520 --> 00:18:16,799 questions for them. >> Yes. Oh, thank you. Perfect. Um, okay. 232 00:18:14,559 --> 00:18:20,080 So, uh, because the city, um, did a great job kind of frontloading and gave 233 00:18:18,480 --> 00:18:24,160 you a lot in the staff report about ourselves and our background, I'm just 234 00:18:21,679 --> 00:18:27,919 going to jump right into, um, I had five critical points basically that 235 00:18:25,520 --> 00:18:31,600 differentiate EAH and kind of reaffirm our ability to to execute what we've 236 00:18:30,000 --> 00:18:37,200 proposed. Um, so first, uh, the EH design 237 00:18:35,200 --> 00:18:41,840 acknowledges the Loscalinus Valley Sanitary District easement that's 238 00:18:39,039 --> 00:18:45,520 running through the center of the site. Um so because of that we did create a 239 00:18:43,840 --> 00:18:49,039 family oriented community with this constraint in mind um that fits the 240 00:18:47,600 --> 00:18:53,679 scale of the surrounding neighborhood at three stories ensures the city dollar 241 00:18:51,360 --> 00:18:57,840 goes as far as it can and leverage uh reflects the city's values on 242 00:18:55,360 --> 00:19:02,640 sustainability, speed, open space and innovation. Um we didn't want to start 243 00:19:00,000 --> 00:19:06,320 with a less timely potential option of the sanitary district relinquishing that 244 00:19:04,720 --> 00:19:09,760 easement without doing you know some additional due diligence with you all as 245 00:19:08,320 --> 00:19:12,400 a city partner and figuring out what they might want to do with that. So we 246 00:19:11,120 --> 00:19:16,880 really just started with that as a constraint in mind knowing that there's 247 00:19:14,240 --> 00:19:21,840 some flexibility should that change. Um so the EH design centers on an 248 00:19:19,600 --> 00:19:26,080 environmental approach. Uh we'd be offering a modular full electric 249 00:19:24,000 --> 00:19:30,799 execution. Um plus the potential for adaptive reuse of some of the existing 250 00:19:28,559 --> 00:19:33,919 structures should the city desire it. Um we have completed two modular 251 00:19:32,640 --> 00:19:37,840 developments in other parts of the Bay Area and are starting our third. So we 252 00:19:35,520 --> 00:19:42,640 do have some experience with that. Um, and this translates to no concrete, um, 253 00:19:40,320 --> 00:19:48,160 less noise, less waste, and less time during construction. Um, so that leads 254 00:19:44,960 --> 00:19:52,960 me to my next point here. Um, so our proposal does have the lowest 255 00:19:50,000 --> 00:19:57,200 cost of the three. Uh, tonight we rightsize the project to fit the 256 00:19:54,480 --> 00:20:00,799 criteria for four viable funding paths um to increase our chances of getting 257 00:19:58,799 --> 00:20:06,000 funded as quickly as possible or within the timeline that uh, Greg shared. Um so 258 00:20:04,559 --> 00:20:09,760 and plus to [clears throat] increase our along with that to also have a possible 259 00:20:08,080 --> 00:20:14,240 better interest rate and access to some upfront modular capital. So we would not 260 00:20:12,160 --> 00:20:18,720 be able to to offer that high level of certainty of getting awarded these 261 00:20:16,000 --> 00:20:22,640 particular types of funds um at the cost efficiency with a more expensive design. 262 00:20:20,720 --> 00:20:26,480 So that is really why we went with the three-story garden style with the 263 00:20:24,160 --> 00:20:29,679 potential for modular. Um in our proposal, EH had included a letter of 264 00:20:28,320 --> 00:20:33,360 support from the San Francisco Accelerator Fund, the housing 265 00:20:31,200 --> 00:20:38,559 accelerator fund. Um that fund requires family units stay under a $750,000 total 266 00:20:36,320 --> 00:20:42,159 development cost per unit. Um and it allows us to access a much better 267 00:20:40,080 --> 00:20:47,280 interest rate um than the market. And they also do have um a great modular 268 00:20:44,320 --> 00:20:50,960 program that we can access. Um so in addition to designing most cost 269 00:20:48,960 --> 00:20:56,559 effectively to have four viable financing paths, um EAH did want to 270 00:20:55,039 --> 00:21:00,640 design with the neighborhood character top of mind. Um, our goal was to reflect 271 00:20:59,039 --> 00:21:05,280 the values and priorities of the city with deeper affordability, larger family 272 00:21:03,120 --> 00:21:09,200 units, um, had a density and parking ratio that was practical for families. 273 00:21:07,440 --> 00:21:13,440 Um, the option to include permanent supportive housing with a potential 274 00:21:11,039 --> 00:21:17,280 health care partner should, um, one funding become available and should that 275 00:21:14,880 --> 00:21:21,679 be desired by the city. Um, and then also, you know, just a high level of 276 00:21:19,039 --> 00:21:25,840 sustainability and a lot of open space. Um and again three stories also gets us 277 00:21:23,520 --> 00:21:30,960 that cost savings but we left our design very flexible to add on uh or adjust as 278 00:21:28,640 --> 00:21:35,919 we refine with the city as Mr. Hinkle mentioned. Um so my last point then is 279 00:21:34,240 --> 00:21:41,440 uh uh collaboration with the city. Um so 280 00:21:39,200 --> 00:21:46,720 connection to the smart train and buses are critical for our residents. Eh plans 281 00:21:43,760 --> 00:21:50,559 to serve households at an average of 45% of the area median income which is just 282 00:21:48,720 --> 00:21:55,840 under 100,000 a year for a family of four. Um so because of that we really 283 00:21:52,559 --> 00:22:00,240 need to um prioritize state funding that can provide transit oriented development 284 00:21:57,919 --> 00:22:04,720 um that can provide uh subsidies and operating support and really prioritize 285 00:22:02,640 --> 00:22:08,720 state funds for lower-income households. Um eh has a very strong working 286 00:22:07,039 --> 00:22:13,120 knowledge regarding improvements to the pedestrian path to the smart uh train 287 00:22:11,200 --> 00:22:16,480 and to the bus station um and to downtown because of our prior 288 00:22:14,400 --> 00:22:20,080 partnership with the city um and with the transit agencies. Uh we were the 289 00:22:18,640 --> 00:22:23,919 partner for the affordable housing and sustainable communities program grant on 290 00:22:21,760 --> 00:22:27,919 a Northgate mall project that did not move forward. Um but we do have all of 291 00:22:26,000 --> 00:22:31,600 the the working knowledge and research and plans that we were going to be 292 00:22:30,000 --> 00:22:37,200 submitting for that application which would be relevant for this site as well. 293 00:22:33,760 --> 00:22:41,520 Um because it's the same station. Um and then with that, you know, so we'd be 294 00:22:39,120 --> 00:22:45,440 bringing all that with us. Um and also would want to work with the city to to 295 00:22:43,200 --> 00:22:48,960 ensure we understand how you'd like to build that path. um you know in the 296 00:22:47,440 --> 00:22:54,159 right infrastructure improvement funds that would be available um should state 297 00:22:51,760 --> 00:22:57,600 funding be allowed to to do that. Um so with that I'm going to end there um and 298 00:22:56,159 --> 00:23:03,280 then I don't know if you want us to do questions now or after. 299 00:23:01,200 --> 00:23:07,679 » Yeah if we have any top of the line questions or we just keep going through. 300 00:23:05,600 --> 00:23:11,559 » We'll just keep going through. >> Yeah. Thank you so much. 301 00:23:16,480 --> 00:23:19,720 Thank you. 302 00:23:26,080 --> 00:23:34,240 » Okay. Can you make that? Oh, cool. Thanks. So, good evening. Um, I'm Tammy 303 00:23:31,440 --> 00:23:39,440 Strauss from Eden Housing. We have a few more slides than our uh the previous 304 00:23:37,760 --> 00:23:45,200 presenter, so I might talk a little faster. Tonight, we're sharing Eden's 305 00:23:41,840 --> 00:23:50,080 vision for 350 Male Road. Our proposal is rooted in affordability, family 306 00:23:47,600 --> 00:23:56,039 housing, transit access, community engagement, and partnership, and long 307 00:23:52,400 --> 00:23:56,039 long-term stewardship. 308 00:23:56,400 --> 00:24:03,760 Eden has been addressing California's affordable housing housing crisis for 309 00:24:01,120 --> 00:24:07,760 since 1968. Our strength is that we're not only a developer, we're also a 310 00:24:05,679 --> 00:24:12,240 long-term owner, operator, property manager, and resident service provider. 311 00:24:10,320 --> 00:24:16,760 That means we remain accountable to the community well beyond construction. 312 00:24:17,120 --> 00:24:26,240 Uh we have a strong and growing presence in in Marin County and in San Raphael. 313 00:24:22,400 --> 00:24:31,520 Our recent work uh in San Raphael is our Vivivalon and Kasa Canal which uh was 314 00:24:29,440 --> 00:24:36,640 designed by Van Meter Williams Pollock who's here with us again tonight. Oakill 315 00:24:34,000 --> 00:24:41,120 in Marin City and Tamalco Homes and Point Rays. Um our local experience 316 00:24:39,279 --> 00:24:47,600 helps us understand the context partnerships and expectations in Marin 317 00:24:44,000 --> 00:24:53,039 County and in San Raphael. Okay. Uh, this project at a glance will 318 00:24:50,400 --> 00:24:58,320 include 111 homes exceeding the city's 80 unit requirement. The homes will 319 00:24:55,279 --> 00:25:04,240 serve households up to 60% of AMI with an average affordability of 49%. The 320 00:25:01,760 --> 00:25:11,279 proposal will meet the June 30th 28 entitlement deadline and the uh RTDC uh 321 00:25:09,360 --> 00:25:16,320 was mentioned RTDC was pretty high, but it reflects robust community engagement, 322 00:25:13,840 --> 00:25:19,679 parking, and the proposed public and neighborhood improvements. 323 00:25:20,159 --> 00:25:27,120 We've assembled a team with the experience needed to deliver a complex a 324 00:25:24,400 --> 00:25:30,799 complex affordable housing project. Eden brings affordable housing devel 325 00:25:28,880 --> 00:25:35,360 development, financing, ownership and operations and resident services 326 00:25:32,640 --> 00:25:40,720 experience. Van meter Williams Pollock brings strong affordable housing and 327 00:25:37,440 --> 00:25:45,600 mid-rise design exper expertise. and our engagement team engaged fora brings 328 00:25:43,200 --> 00:25:50,640 community engagement capacity grounded in equity, listening and local t 329 00:25:47,760 --> 00:25:58,640 context. Together our team is built for execution and partnership. 330 00:25:54,000 --> 00:26:02,000 I will hand it over to Sarah. Thank you Tammy. Thank you all for 331 00:26:00,320 --> 00:26:07,520 having us. My name is Sarah Vicaro. I'm principal with Engage for representing 332 00:26:03,760 --> 00:26:12,640 our team here tonight at engage. Oh, thank you. 333 00:26:09,679 --> 00:26:17,440 Um at engage fora we believe that design is better with diverse voices at the 334 00:26:14,799 --> 00:26:20,720 table. Engage for specializes in leading thoughtful and authentic community 335 00:26:19,039 --> 00:26:25,039 engagement that is not just informational but truly allows the 336 00:26:22,960 --> 00:26:30,080 community and future residents residents to meaningfully inform the project. Our 337 00:26:27,679 --> 00:26:34,240 approach will be to listen early while also being transparent about the project 338 00:26:32,240 --> 00:26:38,640 goals and non-negotiables. Identify community priorities and 339 00:26:36,240 --> 00:26:42,320 concerns and partner with the Eden and Ban meter Williams Pollock team to allow 340 00:26:40,559 --> 00:26:46,279 the community's input to inform the project design and development. 341 00:26:47,120 --> 00:26:53,360 Our engagement approach is rooted in deep listening and authentic 342 00:26:50,640 --> 00:26:57,840 co-creation. Phases two and three in the middle of this diagram are where we will 343 00:26:55,440 --> 00:27:02,559 spend most of our time engaging with the project neighbors, the broader San 344 00:27:00,159 --> 00:27:07,039 Raphael community, and potential future residents to shape the project. Phase 345 00:27:05,039 --> 00:27:11,039 one at the beginning is where we will gain valuable insights into the 346 00:27:08,559 --> 00:27:14,400 community through one-on-one interviews. And then phase four at the end, 347 00:27:12,720 --> 00:27:19,200 accountability. This is where we will report back to the community on how 348 00:27:16,559 --> 00:27:24,320 their specific input has been integrated into the design and celebrate that the 349 00:27:21,520 --> 00:27:28,000 project is stronger because of it. Our engagement process will be closely 350 00:27:25,919 --> 00:27:34,640 coordinated with the project team and the city um to ensure the timeline um to 351 00:27:31,840 --> 00:27:38,559 to to meet the entitlements timeline and to ensure that feedback can be 352 00:27:35,919 --> 00:27:41,960 meaningfully informed at specific design decision steps. 353 00:27:43,039 --> 00:27:48,880 Our team has developed a highly varied toolkit of events and exercises to 354 00:27:46,799 --> 00:27:53,039 quickly gain an understanding of the community's values to build trust with 355 00:27:51,200 --> 00:27:57,120 them and to explore design options to create a project vision together that 356 00:27:54,640 --> 00:28:01,600 strengthens the design. We anticipate using multiple ways to reach people, not 357 00:27:59,279 --> 00:28:06,559 just the traditional public meetings, but also neighbor outreach focus groups, 358 00:28:03,919 --> 00:28:11,440 popups at local city events, community workshops, all with inclusive and 359 00:28:08,799 --> 00:28:14,960 multilingual materials as needed. The intent is to meet people where they are 360 00:28:13,120 --> 00:28:17,960 and make the participation easily accessible. 361 00:28:20,720 --> 00:28:29,360 » Thanks, Rick Williams with Ban Meter Williams Pollock. Uh I've been a 362 00:28:26,080 --> 00:28:34,159 resident of San Rafale since uh pretty much since I was two or three years old 363 00:28:31,520 --> 00:28:40,000 and uh have lived here in the downtown for the last 25 years. and we've done a 364 00:28:36,880 --> 00:28:43,919 number of developments which we feel uh respond to the community input that 365 00:28:42,000 --> 00:28:51,440 we've received on those variety of projects uh in downtown and also in the 366 00:28:47,120 --> 00:28:57,120 canal area and throughout Marine County. We've also developed a number of 367 00:28:53,600 --> 00:29:04,320 streetscape projects that expand the impact of a development beyond just the 368 00:29:00,240 --> 00:29:10,320 housing into pedestrian safety, bicycle access to transit to neighborhood 369 00:29:07,279 --> 00:29:14,080 activities. And so that is another key feature of our proposal. 370 00:29:12,640 --> 00:29:20,159 And we've done that on a number of projects with Eden Housing as well. Our 371 00:29:17,679 --> 00:29:25,679 vision is really a family focused community uh affordable near transit 372 00:29:23,679 --> 00:29:30,399 taking advantage of the local services but really it's about giving 373 00:29:27,200 --> 00:29:37,039 opportunities for the residents and this will forward San Rafll's goals and give 374 00:29:33,600 --> 00:29:40,520 more families the opportunity to succeed in San Rafll. 375 00:29:40,640 --> 00:29:50,320 The overall area site plan is a one of simple circulation. We respect and 376 00:29:45,840 --> 00:29:57,600 provide good access for the uh for the drainage way and all of that area 377 00:29:55,200 --> 00:30:03,200 as well as bike access and pedestrian access. Uh we looked at multiple 378 00:30:00,399 --> 00:30:08,080 projects, multiple different scenarios. There's many different uh opportunities 379 00:30:05,520 --> 00:30:14,720 here and we'll listen to the community to refine and and develop the design in 380 00:30:11,919 --> 00:30:20,399 its entirety. We've also used illustrations to give 381 00:30:17,600 --> 00:30:26,000 the community really a very clear understanding of what the development 382 00:30:22,080 --> 00:30:31,279 is. Here's a image on Maryale showing how the building relates to the street 383 00:30:27,919 --> 00:30:36,960 and relates to the adjacent neighborhood as well. We even went to 384 00:30:34,320 --> 00:30:42,399 uh into the neighborhood to Las Flores Avenue and took a picture of how the 385 00:30:40,480 --> 00:30:48,559 buildings just kind of peak over the top of the homes that are uh directly across 386 00:30:45,200 --> 00:30:53,919 the street the canal from it. We also because I live in Marin are 387 00:30:50,640 --> 00:31:00,799 sensitive to the uh sensitivity to the viewing of uh the developments from the 388 00:30:57,760 --> 00:31:07,279 freeway. And so we gave an initial image from how that would look as well. 389 00:31:03,919 --> 00:31:12,000 And then one of the key issues was that we really developed a strategy of a 390 00:31:10,159 --> 00:31:16,960 bicycle and pedestrian improvement access working very closely with the 391 00:31:14,240 --> 00:31:23,760 neighborhood and adjacent uh residents and adjacent businesses to gain access 392 00:31:20,000 --> 00:31:27,840 all the way to San Pedro Road. And it's also built with a vision of 393 00:31:26,080 --> 00:31:33,679 sustainability, resilience, and wellness. So that so the solar system 394 00:31:30,240 --> 00:31:39,519 will support a resilience hub. The bio swala will will provide the clean storm 395 00:31:36,799 --> 00:31:44,720 water management and bike storage and repair stations will also provide 396 00:31:41,679 --> 00:31:50,600 improvements and provide access both to transit and for the residents throughout 397 00:31:47,360 --> 00:31:50,600 the area. 398 00:31:52,000 --> 00:32:00,080 rather than repeat myself. Uh long-term deed restrictions will preserve the 399 00:31:56,880 --> 00:32:04,559 affordability for at least 99 years. The design is going to prioritize 400 00:32:01,919 --> 00:32:11,320 accessibility and inclusive design including accessible common areas, 401 00:32:06,799 --> 00:32:11,320 units, amenities, and circulation. 402 00:32:11,519 --> 00:32:18,720 Uh we're also have our own in-house resident services provider. Eden's res 403 00:32:16,320 --> 00:32:22,720 resident services model model is designed to support stability and 404 00:32:20,559 --> 00:32:26,960 community connection. Services may include on-site coordination, community 405 00:32:24,880 --> 00:32:31,360 building activities, referrals, workshops, family programming, and 406 00:32:29,279 --> 00:32:36,559 coordination with property management. The goal is not to provide just housing, 407 00:32:33,440 --> 00:32:42,159 but to support residents need to thrive. Uh here we go. Financing our favorite. 408 00:32:40,080 --> 00:32:46,720 We have deep experience assembling layered affordable housing financing. 409 00:32:44,159 --> 00:32:51,919 That's kind of Lasagna right there. This 111 unit concept was designed to support 410 00:32:49,600 --> 00:32:56,720 competitive funding applications while meeting the city's entitlement uh 411 00:32:54,000 --> 00:33:01,200 timeline. Our early feasibility work will confirm a SQA path, an entitlement 412 00:32:58,960 --> 00:33:08,000 path, design review, agency coordination, construction type, site 413 00:33:03,760 --> 00:33:12,000 conditions, and partnership structure. The schedule again is in structured to 414 00:33:10,480 --> 00:33:17,760 meet the city's requirement to be entitled by June 30th, 2028. 415 00:33:15,039 --> 00:33:22,159 Um, entitlements, financing, design, and construction sequencing will need to be 416 00:33:19,919 --> 00:33:27,039 carefully coordinated. Um, and lastly, thank you. Thank you for 417 00:33:25,440 --> 00:33:31,279 the opportunity to be here and to present our vision. And we're ready to 418 00:33:29,039 --> 00:33:35,120 deliver a feasible community responsive affordable housing development at 350 419 00:33:33,440 --> 00:33:38,399 Mary Road. >> Thank you. And I know we're holding 420 00:33:36,320 --> 00:33:40,399 questions, but Tammy, I have to ask. Yes. 421 00:33:38,720 --> 00:33:45,679 » So, I really appreciate the outreach and you spent quite a bit of time talking 422 00:33:42,080 --> 00:33:49,200 about that. Sarah did. And yet, or also you showed an image of what a building 423 00:33:47,919 --> 00:33:53,679 would look like. So, I'm trying to figure out how those two mesh when 424 00:33:51,039 --> 00:33:56,240 you're taking in input. And yet, there's and I know that design changes, but 425 00:33:55,120 --> 00:33:59,840 maybe you could speak to that because I'm sure other people in the room are 426 00:33:57,679 --> 00:34:01,600 » um I can give you an example. How about that? 427 00:34:00,240 --> 00:34:08,240 » That would be great. in another community, we presented a fivestory 428 00:34:04,640 --> 00:34:13,280 building um as our initial concept and through community engagement and all of 429 00:34:11,359 --> 00:34:19,040 the workshops and things that we did, we found out that the community really 430 00:34:16,320 --> 00:34:24,480 preferred a four-story building. So, what we did um through that feedback, we 431 00:34:21,839 --> 00:34:31,119 redesigned the building, made it wider, not taller, actually um designed for 432 00:34:28,079 --> 00:34:35,919 more units, but a shorter building. So that's it's just an initial concept and 433 00:34:33,520 --> 00:34:39,440 we refine that through all of the community engagement that we do. 434 00:34:38,000 --> 00:34:41,440 » Thank you. That help that's very helpful. Thank you so much. 435 00:34:40,800 --> 00:34:45,040 » And anything else? >> Uh there might be others but I I just 436 00:34:43,359 --> 00:34:50,184 had to reconcile that. So thank you. That was Yeah. 437 00:34:46,879 --> 00:34:50,184 » Thank you. [snorts] 438 00:35:01,280 --> 00:35:07,680 Okay. Good evening, mayor, council member, staff, community members. Thank 439 00:35:05,760 --> 00:35:11,200 you for the opportunity to be here. I'm Eve Stewart. I'm the senior vice 440 00:35:09,440 --> 00:35:17,359 president uh for real estate development with Saha. Um and also with our team 441 00:35:15,119 --> 00:35:22,000 here tonight, we have April Ty. And April and I will 442 00:35:20,400 --> 00:35:26,880 be sharing the presentation. And then our other team members naan my senior 443 00:35:24,560 --> 00:35:33,040 project manager Katie Akerly with our architect Chris Hess and Jonathan Stern 444 00:35:29,839 --> 00:35:37,839 are also here uh for questions later on. So quickly about SA uh we were founded 445 00:35:35,680 --> 00:35:42,160 over 60 years ago. We've developed approximately 80 properties across seven 446 00:35:40,079 --> 00:35:46,640 counties and in addition to our development activity we also provide 447 00:35:44,079 --> 00:35:51,359 property management services and robust on-site resident services. We run a 448 00:35:49,520 --> 00:35:56,240 volunteer program that brings in over 250 community volunteers annually to 449 00:35:54,000 --> 00:36:00,079 support our residents and strengthen our connections in the broader community. 450 00:35:58,480 --> 00:36:03,440 Because we're a long-term operator, we're always looking back to learn from 451 00:36:02,079 --> 00:36:06,640 what we've done, where we've been successful, where we can improve. And 452 00:36:05,200 --> 00:36:11,200 we're always looking forward to make sure that the new communities we develop 453 00:36:08,480 --> 00:36:15,520 are ready for future challenges and that they will be beautiful, thriving 454 00:36:13,200 --> 00:36:20,640 communities for decades to come. To do this, we collaborate with local experts. 455 00:36:17,920 --> 00:36:24,560 We invest in community engagement and we work with our design team to iterate to 456 00:36:22,640 --> 00:36:29,400 make sure that we are meeting community needs and can achieve broad-based 457 00:36:26,400 --> 00:36:29,400 support. 458 00:36:30,880 --> 00:36:36,960 We uh do have a strong presence in the North Bay. Uh we are not in Marin 459 00:36:35,200 --> 00:36:42,560 currently. Um but we have several projects in Napa and Soma. Um and we 460 00:36:40,079 --> 00:36:48,960 have local Sanfell expertise on our team. Um, and we've started to connect 461 00:36:45,440 --> 00:36:53,680 with key stakeholders and have received support and endorsements from the Ritter 462 00:36:50,800 --> 00:36:56,800 Center and Canal Alliance. Um, I'm going to pass it over to April to talk a 463 00:36:55,839 --> 00:36:59,800 little bit more about community engagement. 464 00:37:00,320 --> 00:37:09,520 Thank you, Eve, and good evening, Mayor Kate and Council Member Bushy, um, and 465 00:37:06,480 --> 00:37:14,000 city staff. I'm April Tally, and I'll be supporting SAHA's community engagement 466 00:37:11,520 --> 00:37:18,800 efforts for this project. I've worked on community engagement for large complex 467 00:37:16,400 --> 00:37:23,359 developments including Northgate Mall here in San Rafale and the Patrol 468 00:37:20,720 --> 00:37:28,000 redevelopment in San Francisco. As the city's project director for Northgate, I 469 00:37:26,000 --> 00:37:32,960 served as the primary point of contact for community related questions and 470 00:37:30,480 --> 00:37:36,960 communications, working alongside the developer to keep residents informed and 471 00:37:35,440 --> 00:37:41,760 ensure the city's engagement requirements were met. The experience 472 00:37:39,599 --> 00:37:47,200 that experience reinforced for me that engagement is most effective when it 473 00:37:44,400 --> 00:37:52,800 starts early while there is still real opportunity to shape the project. That's 474 00:37:49,680 --> 00:37:58,480 why our team plans to begin as soon as the ENA is executed. We'll work closely 475 00:37:55,839 --> 00:38:03,359 with the city and the uh the community partners, nearby residents and 476 00:38:00,800 --> 00:38:08,720 businesses to communicate early, listen to concerns, and offer different ways to 477 00:38:05,599 --> 00:38:14,000 participate. The proposed unit count and parking ratio are a starting point and 478 00:38:11,680 --> 00:38:19,400 we're open to refining both based on the input from the city and the community. 479 00:38:16,240 --> 00:38:19,400 Thank you. 480 00:38:23,440 --> 00:38:32,560 That's just a quick summary of the points April made. Um so getting into 481 00:38:29,440 --> 00:38:37,680 this opportunity um our team of course uh looked very closely at the site and 482 00:38:34,720 --> 00:38:40,720 there were several uh core values core principles that were informing our 483 00:38:39,520 --> 00:38:44,720 approach. So of course we want to achieve or exceed the city housing goals 484 00:38:42,480 --> 00:38:48,720 for the site in terms of number of units build an appropriate scale for the 485 00:38:46,720 --> 00:38:52,400 neighborhood. incorporate universal design principles so that we have an 486 00:38:50,320 --> 00:38:58,560 inclusive community for folks with a range of um abilities and challenges 487 00:38:55,440 --> 00:39:03,680 from mobility to uh sensory and neurode divergent challenges. Um we are working 488 00:39:01,920 --> 00:39:08,400 to enhance the urban design and street presence along Midale, improve smart 489 00:39:06,240 --> 00:39:12,560 station connectivity and secure state funds for transit improvements. I'll 490 00:39:10,320 --> 00:39:16,800 talk a little bit more about that in a minute. Um, and of course we want to 491 00:39:14,720 --> 00:39:22,800 ensure the long-term climate resilience of our building and this community. Uh, 492 00:39:19,280 --> 00:39:28,960 and also establish a financable pathway to getting this project done. 493 00:39:25,839 --> 00:39:33,119 And importantly, as we looked at the site, so this is a massing study. It's 494 00:39:30,720 --> 00:39:39,520 not a design. It just gives a sense of what could fit on the site and the 495 00:39:36,160 --> 00:39:43,520 scale. Um so here you can see that we are 496 00:39:41,040 --> 00:39:48,880 initially thinking about a fourstory design that would have um 497 00:39:47,359 --> 00:39:52,800 bridge the scale of the neighborhood. There's you know different densities 498 00:39:50,160 --> 00:40:00,640 there. So while this does add density to the neighborhood, it is um still kind of 499 00:39:56,240 --> 00:40:05,599 a gentle like ramping um and not um we feel too out of scale with what's 500 00:40:02,400 --> 00:40:09,119 already built there. Um we have primarily two and threebedroom 501 00:40:07,359 --> 00:40:15,440 apartments in the scheme so that we can serve families um households with young 502 00:40:12,240 --> 00:40:21,520 children or extended um families that might have elders also living with them. 503 00:40:18,240 --> 00:40:26,960 The um parking approach is to do surface parking and that offers advantages 504 00:40:24,320 --> 00:40:32,240 including cost effectiveness um and providing a buffer for the 505 00:40:30,079 --> 00:40:38,800 neighbors to the south as well as the freeway. um the 101 there to the east. 506 00:40:36,000 --> 00:40:43,200 Our bedroom count is 185 bedrooms in this scheme. Um and that's sometimes a 507 00:40:40,400 --> 00:40:46,079 helpful metric to consider. Um the building itself of course will have a 508 00:40:44,640 --> 00:40:51,280 lobby, spacious community and multi-purpose spaces as well as smaller 509 00:40:49,040 --> 00:40:55,359 activity and meeting spaces. All upper floors will be served by an elevator. 510 00:40:53,599 --> 00:41:00,240 And we will have on-site property management, an on-site 511 00:40:57,920 --> 00:41:03,920 resident representative, so a staff person who lives on site uh with 512 00:41:02,160 --> 00:41:07,280 maintenance and resident services offices. And again, inclusive and 513 00:41:05,680 --> 00:41:11,760 universal design features will be incorporated throughout. 514 00:41:10,000 --> 00:41:19,440 Um we've also taken an approach of orienting views toward the creek um and 515 00:41:15,839 --> 00:41:23,920 preserving existing trees to emphasize connections with the existing ecosystem. 516 00:41:21,760 --> 00:41:28,000 bringing in these bofilic features that enhance wellness um and also provide an 517 00:41:26,400 --> 00:41:32,400 important buffer for flood control and storm water management. 518 00:41:30,079 --> 00:41:36,560 We envision an active street frontage. Um and very importantly, we're focused 519 00:41:34,079 --> 00:41:40,960 on active transportation connections and improvements to get this neighborhood 520 00:41:39,359 --> 00:41:46,880 even more conveniently linked to the smart station. It is so very close. Uh 521 00:41:44,079 --> 00:41:51,280 but there currently isn't um a formal way to expediently access the station 522 00:41:49,040 --> 00:41:57,520 without, you know, going out and around. Um, 523 00:41:53,119 --> 00:42:01,200 next slide is the same site plan, but uh, we wanted to emphasize the 524 00:41:58,800 --> 00:42:04,480 sustainability features and the thinking that that we're bringing to this 525 00:42:02,560 --> 00:42:08,400 project. And again, this is just the early initial thoughts and we're really 526 00:42:07,040 --> 00:42:12,480 looking forward to engaging with the community and stakeholders to get their 527 00:42:09,920 --> 00:42:16,880 input. But we envision an all-electric building that was energy efficient with 528 00:42:14,319 --> 00:42:20,640 solar PV array to offset as much of our energy use as possible with on-site 529 00:42:18,480 --> 00:42:24,640 generation. Uh we have opportunities to use panelized construction andor mass 530 00:42:22,880 --> 00:42:29,280 frame building technologies to reduce construction waste and also speed up 531 00:42:26,319 --> 00:42:33,680 construction schedule. Uh superior indoor air quality will be a goal uh 532 00:42:31,520 --> 00:42:38,079 especially to address the potential impacts of being close to the 101 and to 533 00:42:35,920 --> 00:42:44,000 protect against future smoke events. We've increased increased tree cover for 534 00:42:40,960 --> 00:42:48,160 passive cooling, promoting biodiversity, um preserving site permeability, and 535 00:42:46,319 --> 00:42:52,480 contributing to again improved mental health and well-being as studies have 536 00:42:49,680 --> 00:42:58,160 shown when you have access to nature. Um and then back to this connection with um 537 00:42:55,599 --> 00:43:03,359 the the active transportation network to facilitate biking, walking, scootering, 538 00:43:00,960 --> 00:43:08,160 ways to get around uh that don't involve driving alone in your car essentially. 539 00:43:05,680 --> 00:43:13,040 Um and of course the Disaster resilience and preparedness is something that's top 540 00:43:09,599 --> 00:43:16,319 of mind for our operations um where we operate housing and we have a lot of 541 00:43:14,720 --> 00:43:22,160 elders, seniors, people with special needs um and we want to be there to 542 00:43:18,160 --> 00:43:27,520 support them um when the worst happens. Um so some of the features that we will 543 00:43:24,720 --> 00:43:32,720 work to include um is a micro grid and that essentially provides an opportunity 544 00:43:30,160 --> 00:43:38,880 to power the building through either a battery system or a portable generator 545 00:43:36,079 --> 00:43:43,839 to ensure key functions um in the event of prolonged power outage or other 546 00:43:41,040 --> 00:43:47,119 shelter in place um requirements. And that allows both our building residents 547 00:43:45,920 --> 00:43:53,200 as well as other folks in the neighborhood to have a um a place of 548 00:43:50,880 --> 00:43:58,880 refuge where you can charge your phones, store medication, get relief if it's 549 00:43:56,400 --> 00:44:03,440 very hot out, um receive essential supplies, and also receive emotional 550 00:44:00,800 --> 00:44:06,400 support. Now, we didn't do a design of the 551 00:44:05,119 --> 00:44:10,400 building because again, it's a it's a massing study, but we have included 552 00:44:08,400 --> 00:44:15,440 these precedent images just to give a sense of what we're thinking in terms of 553 00:44:12,240 --> 00:44:19,920 architectural style, uh, materials, colors, and again, this um the scale of 554 00:44:18,400 --> 00:44:23,720 the building and how it relates to the site and the open space. 555 00:44:25,680 --> 00:44:34,240 our uh financing package and and as we heard includes um tax credits, taxes and 556 00:44:31,280 --> 00:44:38,240 bonds and this state program which we fondly refer to as ASIC, the affordable 557 00:44:36,480 --> 00:44:43,839 housing and sustainable communities. It's not the only way to fund this 558 00:44:40,000 --> 00:44:49,920 project, but um the exciting part about ASIC is it comes with housing funds and 559 00:44:45,920 --> 00:44:54,480 also transportation grant funds. Um SAHA has been very successful using this 560 00:44:51,599 --> 00:45:01,760 program. We've built six communities so far with this money from San Jose to um 561 00:44:58,720 --> 00:45:06,000 uh to to Napa and with Berkeley and Oakland in between. And so in addition 562 00:45:04,079 --> 00:45:12,560 to the housing funds, you can include a package um for things like station 563 00:45:09,440 --> 00:45:16,079 connectivity, bike ped improvements, uh transit passes. Up in the corner, you 564 00:45:14,720 --> 00:45:22,079 can see some of the improvements we were able to do in San Jose. And it will also 565 00:45:18,400 --> 00:45:25,119 fund uh fund um community events, you know, such as street closures um and 566 00:45:24,319 --> 00:45:28,480 festivals. >> And thank you, Eve. Do you have any 567 00:45:26,640 --> 00:45:30,800 closing comments? Because >> my time is up. 568 00:45:29,359 --> 00:45:33,839 » I heard I heard a little dinging over there. That [laughter] 569 00:45:32,480 --> 00:45:38,160 » Well, in conclusion, I will just say that we are ready to get started. Uh we 570 00:45:36,240 --> 00:45:42,880 would be delighted to work with you and the community to see this project 571 00:45:40,800 --> 00:45:47,200 through. [clears throat] Excuse me. Um and we can certainly meet uh the 572 00:45:44,400 --> 00:45:51,760 timelines that the city has established. Thank you, Eid. Thank you, April. Thank 573 00:45:49,440 --> 00:45:55,440 you. >> So, I know I have some questions. I 574 00:45:53,200 --> 00:46:00,880 think my questions are broad, but I will hand it over to you first, but I just 575 00:45:58,000 --> 00:46:04,240 want staff to speak to a moment. I was thinking, and both Council Member Bushy 576 00:46:02,800 --> 00:46:06,720 and I were on the planning commission prior to being on the council, so we've 577 00:46:05,359 --> 00:46:10,000 been in land use for a very, very long time, and this seems like a really 578 00:46:08,240 --> 00:46:14,800 unusual situation. I don't think I've ever been on the receiving side of 579 00:46:12,800 --> 00:46:19,119 hearing three incredible presentations. So could you just speak to that because 580 00:46:17,440 --> 00:46:22,560 it it does feel unusual and just to maybe I don't know put that in context 581 00:46:21,440 --> 00:46:26,480 for the community. >> I I don't mind taking that as a startup 582 00:46:24,800 --> 00:46:30,480 and really for my colleagues if you want to add to that it it really is a unique 583 00:46:28,800 --> 00:46:35,040 opportunity for Sanfell. I'm actually excited to bring this forward and you 584 00:46:32,480 --> 00:46:40,400 can see what a hard like I'll pick all three. Um the the key is finding 585 00:46:37,920 --> 00:46:43,839 location sites and lining up. And I do think we really do have to look at 586 00:46:42,079 --> 00:46:48,880 really our land assets a little closer to see which ones we can evaluate over 587 00:46:46,560 --> 00:46:53,119 time. It is one of our targeted ends for our our housing program to really look 588 00:46:51,280 --> 00:46:57,760 at city- owned sites really looking at for surplus lands for affordable housing 589 00:46:55,359 --> 00:47:01,440 development. I think I was most pleased with the level and quality of developers 590 00:46:59,760 --> 00:47:06,160 who put on uh this project and I think it's really key about the size. We have 591 00:47:04,079 --> 00:47:09,839 a lot of smaller portion parcels within our that are on our own asset, but the 592 00:47:08,160 --> 00:47:15,119 ability to assemble a larger scale project near transit I think is really 593 00:47:12,079 --> 00:47:18,480 why we got a nice robust kind of um put for for the development affordable 594 00:47:16,720 --> 00:47:22,880 housing development community. Uh you got to remember this is the the top 595 00:47:19,760 --> 00:47:28,880 three. We actually had five. Um so um and I anticipate really evaluating other 596 00:47:26,480 --> 00:47:33,599 potential projects to bring in this level of developers if not others um in 597 00:47:31,839 --> 00:47:38,800 the future. So, this here's really kind of a unique opportunity, but and I said, 598 00:47:35,520 --> 00:47:44,480 it really is a um a real opportunity to try to bring forward needed housing to 599 00:47:41,359 --> 00:47:48,560 this community. These developers uh are been successful across the Bay Area and 600 00:47:46,480 --> 00:47:52,960 even some have not done projects we're in and they want to be and I'm I'd like 601 00:47:50,800 --> 00:47:56,880 to try to find opportunities to broaden our uh opportunities for multiple 602 00:47:55,440 --> 00:48:00,079 developers to bring housing to this community. 603 00:47:58,160 --> 00:48:04,400 So just to follow up, so because the city owns the site, we're having this 604 00:48:01,760 --> 00:48:08,480 conversation because it could be a private developer who wants to build 605 00:48:06,160 --> 00:48:12,480 affordable housing and none of this would be daylighted. They would come 606 00:48:10,319 --> 00:48:16,800 forward and say this is we've chosen. So again, for the community, this is a very 607 00:48:14,319 --> 00:48:20,800 unusual situation, right? Am I correct? Because the city owns the property. 608 00:48:18,800 --> 00:48:23,839 » Correct. If this was private property, in many ways it'd be simpler because 609 00:48:22,319 --> 00:48:28,240 developers would simply say, "I'm entitled to XYZ under these different 610 00:48:26,800 --> 00:48:32,960 state laws." But because it's public property, we have a little bit more um 611 00:48:31,280 --> 00:48:37,359 flexibility in terms of shaping the project. At the same time, we've agreed 612 00:48:35,040 --> 00:48:42,559 to certain terms with the the county, the the 80 units for example, and then 613 00:48:39,680 --> 00:48:47,359 we've certain um citywide goals that Alexis highlighted. So those are sort of 614 00:48:44,880 --> 00:48:51,599 shaping the conversation, but um it's much broader than say a private 615 00:48:49,280 --> 00:48:56,640 development um proposal. >> And I would imagine that there are other 616 00:48:53,760 --> 00:49:00,480 cities that have this possibility of um that owns a parcel and that they don't 617 00:48:58,480 --> 00:49:04,640 have a public conversation that staff goes and selects and then they just 618 00:49:01,839 --> 00:49:09,200 bring it to the council for approval. So again, we're adding something to the 619 00:49:06,559 --> 00:49:12,240 process that's a little different. So okay, because that's it feels different 620 00:49:10,720 --> 00:49:15,520 to me. So, you want to start off with questions and I have a bunch of broad 621 00:49:13,680 --> 00:49:21,839 ones, but nothing specific. >> Uh, well, I want to concentrate on one 622 00:49:17,760 --> 00:49:25,520 particular area and uh just to um uh follow up on um your comments. Yes, it 623 00:49:24,400 --> 00:49:32,720 feels like we're on the other side of the table um in making um these 624 00:49:29,040 --> 00:49:39,520 decisions. Um my questions um are focusing on the long term. Um and I 625 00:49:36,800 --> 00:49:47,680 noticed we're we're approving a 99-year lease. Um, and I'm wondering if is there 626 00:49:43,359 --> 00:49:52,960 a general like highle plan for the 99 years? Um, is the plan that we're going 627 00:49:50,480 --> 00:49:59,920 to build whatever structure is built now will be repaired and maintained for 99 628 00:49:55,760 --> 00:50:06,559 years. Um, will there be a rebuilding at some point? What is the um what is the 629 00:50:03,520 --> 00:50:12,640 the long-term concept? And then to compare the different developers, my 630 00:50:09,280 --> 00:50:17,520 question would be how long is each develop how what is the longest duration 631 00:50:15,440 --> 00:50:22,640 of any functioning site that they've built to to compare them? How long have 632 00:50:20,720 --> 00:50:28,400 they been functioning? So th that's that's where my question 633 00:50:24,559 --> 00:50:30,319 is. Um do should we have staff take a a crack at 634 00:50:28,880 --> 00:50:33,359 » I think I can try to respond to the first part of the question then the 635 00:50:31,760 --> 00:50:38,079 developing teams can probably answer more specifically. Um, so I believe that 636 00:50:36,319 --> 00:50:42,240 level th those kinds of details and those terms are what the city and the 637 00:50:40,319 --> 00:50:46,480 developer team would finalize as part of their development disposition agreement 638 00:50:44,480 --> 00:50:51,119 the next phase once we entered into the exclusive negotiating agreement and 639 00:50:48,400 --> 00:50:55,119 that's what we would later bring back to council to approve 640 00:50:52,960 --> 00:50:58,559 » in terms of like the the details for the long-term vision of the project 641 00:50:56,720 --> 00:51:04,319 long-term operations rather. >> Okay. Thank you. 642 00:51:01,920 --> 00:51:06,319 Did you want to hear how >> everyone runs up? I'm not sure how we're 643 00:51:05,760 --> 00:51:09,680 gonna do this. >> Yeah, I guess [laughter] 644 00:51:08,000 --> 00:51:13,040 » it's a little clunky. Sorry. As I said, that's why I wanted to level set this in 645 00:51:11,359 --> 00:51:17,040 the beginning. That's an unusual situation. 646 00:51:14,160 --> 00:51:23,359 » Um, well, so EA has been in San Rafll since 1968. Um, and we own and operate 647 00:51:20,960 --> 00:51:28,640 all of the developments that we've built and keep them affordable in perpetuity. 648 00:51:26,000 --> 00:51:33,200 Um, so when they come time for rehabilitation or maintenance, we'll, 649 00:51:30,800 --> 00:51:38,079 you know, um, go through the the typical rehab process, maybe refinance, get some 650 00:51:35,760 --> 00:51:41,040 tax credits, and upkeep the property. Um, I think the latest one in Sanfell 651 00:51:39,599 --> 00:51:46,160 was Centertown. We just rehabbed that and looks great. Um, and to my 652 00:51:44,079 --> 00:51:50,800 knowledge, >> so I'm I don't think you quite exactly 653 00:51:48,640 --> 00:51:54,720 answered my question. >> What is the longest duration of a 654 00:51:52,800 --> 00:51:58,720 functioning site that you've had? not how long you've been here. 655 00:51:56,000 --> 00:52:03,920 » Okay. Uh I think our first one came online in 1972 656 00:52:01,839 --> 00:52:08,079 and we still own it. >> It's in Marin somewhere. I believe it's 657 00:52:05,839 --> 00:52:14,240 in Sano. I have to check. We We have a lot. Our portfolio just in Marin is over 658 00:52:11,200 --> 00:52:18,960 2,000 units and we've got over 14,000 in our portfolio. So, but we our first 659 00:52:17,280 --> 00:52:20,480 property we do still own it was from the early 70s. 660 00:52:20,000 --> 00:52:24,599 » Thank you. >> Yeah. 661 00:52:21,599 --> 00:52:24,599 » Thanks. 662 00:52:25,280 --> 00:52:30,640 Thank you. >> Hello, I'm Dixie Bell, senior director 663 00:52:28,640 --> 00:52:36,640 of real estate development for Eden Housing. Our first born on property was 664 00:52:33,280 --> 00:52:42,720 born in 1968 uh which was the founding of um Eden. It's uh affectionately known 665 00:52:40,079 --> 00:52:48,880 as JL around our office which is Josephine Lodge uh lum and it's uh 666 00:52:45,839 --> 00:52:55,680 located in Hayward. Uh it's been uh rehabbed through the years three times. 667 00:52:52,319 --> 00:53:02,160 So, um, we like our other colleagues here, um, are very strong arm. We don't 668 00:52:58,960 --> 00:53:06,400 sell. That's it. We just don't. We're nonprofit developer and we'll go down 669 00:53:04,240 --> 00:53:11,359 with the property as well. There are times in which we've had to feed our own 670 00:53:08,720 --> 00:53:17,359 properties and uh where the properties can't sustain uh some sort of damage or 671 00:53:14,319 --> 00:53:23,440 some sort of uh the operations doesn't uh doesn't sustain uh the operations of 672 00:53:20,880 --> 00:53:28,480 it. some Yes. And we have to write those checks because the most important thing 673 00:53:25,680 --> 00:53:35,119 is that our residents are served with clean housing. It's uh and and we're 674 00:53:32,400 --> 00:53:40,400 there. We are there. We have we have fed properties for many years until we could 675 00:53:38,000 --> 00:53:45,680 find a state funding program that could help uh renew the properties. So, 676 00:53:43,839 --> 00:53:48,960 » and just for clarity, when you say you fed properties, you mean that you used 677 00:53:48,240 --> 00:53:51,760 corporate funds? >> We used corporate funds 678 00:53:50,319 --> 00:53:55,880 » to Thank you. >> Absolutely. 679 00:53:52,559 --> 00:53:55,880 » Thank you, Dixie. 680 00:53:57,440 --> 00:54:05,520 » Thank you. So, uh Saha similar vintage our original buildings uh were the first 681 00:54:03,040 --> 00:54:09,200 building was completed in 1968. The vision at the time was to do five 682 00:54:07,359 --> 00:54:12,559 buildings that with one that was slightly larger that would serve as a 683 00:54:11,119 --> 00:54:19,520 hub. everyone could come and have services and activities and then four 684 00:54:14,800 --> 00:54:23,680 smaller um properties in the vicinity um were kind of feeding into that. Um those 685 00:54:21,760 --> 00:54:28,079 were all located in Oakland. They were originally financed through HUD and so 686 00:54:26,079 --> 00:54:33,599 you know they were simple modest design but they have held up remarkably well. 687 00:54:31,280 --> 00:54:39,200 They have been continuously operating and tenited and beloved by residents. 688 00:54:36,160 --> 00:54:42,319 Um, and they have been renovated and some of them were renovated about 10 689 00:54:40,880 --> 00:54:48,559 years ago and are still looking beautiful. And we're sort of finishing 690 00:54:44,319 --> 00:54:50,880 out the final two that um, well actually there were originally five and then 691 00:54:49,760 --> 00:54:54,800 there were about three more that came along in the early 70s and so we're 692 00:54:52,800 --> 00:55:00,880 finishing out rehabs on those. So some of those buildings have persisted as 693 00:54:57,839 --> 00:55:06,000 very nice communities for over 50 years without having a major capital um, 694 00:55:04,160 --> 00:55:08,960 investment. they've been things have been, you know, the units get turned 695 00:55:07,440 --> 00:55:12,640 every time someone moves out. We've replaced boilers, we've replaced roofs, 696 00:55:11,119 --> 00:55:17,680 we've done painting, but in terms of doing a fullscale large renovation that 697 00:55:15,359 --> 00:55:23,680 requires people to move out. Um, in in some cases, buildings have been um very 698 00:55:21,280 --> 00:55:27,040 functional and comfortable for 50 years. >> Thank you. 699 00:55:24,880 --> 00:55:30,319 » Thank you. >> That's your one. Okay. Well, I have a I 700 00:55:28,800 --> 00:55:34,480 have a couple questions and they're for the staff just more um understanding. I 701 00:55:32,640 --> 00:55:37,920 think it applies to all three of these incredible proposals. So, one of the 702 00:55:36,480 --> 00:55:42,319 applicants talked about the sanitary district easement. So, is that something 703 00:55:40,000 --> 00:55:45,280 that um I'm just wondering how that's going to manifest in this project 704 00:55:43,280 --> 00:55:50,960 because we do have time to work [snorts] with them. 705 00:55:47,680 --> 00:55:56,319 Yeah, that's really um it's part of the the selection of the the development 706 00:55:53,520 --> 00:56:01,200 partner is to understand really the due diligence standpoint or the I guess the 707 00:55:59,680 --> 00:56:04,319 parameters for the development of the project moving forward. You know, there 708 00:56:02,640 --> 00:56:08,000 is an opportunity to modify that easement. There is or is not. It really 709 00:56:06,240 --> 00:56:12,960 depends on the ability of the the district and desire, but it's also to 710 00:56:09,920 --> 00:56:16,480 look at the utility pieces, design uh approaches, neighborhood feedback that 711 00:56:14,960 --> 00:56:20,799 really will shape a lot of the project and their approach. Um, but I, as I 712 00:56:19,280 --> 00:56:25,839 said, I if there's any specific questions related to it seems like, you 713 00:56:22,880 --> 00:56:29,200 know, um, the designers actually acknowledge that and like they was part 714 00:56:27,440 --> 00:56:34,880 of the package information that we put out in the RFP. So, it really is just 715 00:56:31,599 --> 00:56:39,200 kind of project approach. Um but it does require you know coordination and we 716 00:56:37,040 --> 00:56:43,839 actually um have been coordinating with philos valley sanation district on 717 00:56:40,960 --> 00:56:47,680 multiple projects um resolving various easements. Pione is also another factor 718 00:56:45,680 --> 00:56:52,640 for this site. So it's just really just kind of recognizing the development 719 00:56:49,359 --> 00:56:55,680 constraints. Um we are actively engaged in this because at the end of the day we 720 00:56:54,319 --> 00:57:00,880 want to deliver housing in this community. So we are working with that 721 00:56:57,520 --> 00:57:04,160 end but um it's really is up to other decision makers and then constraints 722 00:57:02,720 --> 00:57:08,960 that come about. So >> okay so in the RFP um there was a 723 00:57:07,839 --> 00:57:13,040 discussion about neighborhood improvements. So I'm curious the staff 724 00:57:11,680 --> 00:57:18,079 was looking at that you don't have to go through the rubric that you used but was 725 00:57:14,960 --> 00:57:23,359 that part of it that so be transit or sorry access to transit or pedestrian or 726 00:57:21,359 --> 00:57:28,720 whatever that might be. Was that already one of the criteria? 727 00:57:26,319 --> 00:57:33,760 » Um, no. It wasn't explicitly requested, but it it fell under I I think the the 728 00:57:31,680 --> 00:57:37,839 proposal scoring criteria. >> Okay. 729 00:57:34,160 --> 00:57:44,000 » And as through the the last 10 months or so, one of the themes was what from the 730 00:57:41,280 --> 00:57:48,559 adjacent community was are there any opportunities for benefits to the larger 731 00:57:46,720 --> 00:57:54,240 neighborhood beyond just the provision of housing? and uh Eden proactively 732 00:57:51,680 --> 00:57:58,160 identified formalizing that smart pathway the pathway to the smart station 733 00:57:56,079 --> 00:58:02,240 and should that the city are I understand our public works department 734 00:57:59,520 --> 00:58:08,559 is are is pursuing that independently so if um when when uh one of the follow-up 735 00:58:06,079 --> 00:58:15,760 questions was okay if the city is able to address that um is there are you is 736 00:58:12,480 --> 00:58:20,720 even capable of um improving bicycle and pedestrian improvements along Maryale um 737 00:58:18,640 --> 00:58:24,640 the other direction and they they responded yes. Um we have heard from 738 00:58:23,119 --> 00:58:29,359 some of the the other teams that they're familiar with the same some of the same 739 00:58:26,400 --> 00:58:31,760 funding sources. Um but it was that uh Eden proactively identified that in 740 00:58:31,040 --> 00:58:35,440 their proposal >> and that's something when you did the 741 00:58:32,720 --> 00:58:42,160 ENA that could also be talked about with Okay Zen. Okay. So there was um people 742 00:58:40,240 --> 00:58:46,079 some of the developers um alluded to unit mix about threebedroom two-bedroom 743 00:58:44,799 --> 00:58:49,760 was that again another part of the criteria. Is there something that the 744 00:58:47,599 --> 00:58:55,760 city with your expertise that we want this many threebedroom, this many two, 745 00:58:51,599 --> 00:59:00,319 this many one or studio or was it more let's see what comes forward and what 746 00:58:58,640 --> 00:59:04,240 came forward does it match with what you all are thinking we should be asking 747 00:59:01,839 --> 00:59:10,079 for. Yes. So, we weren't prescriptive in um 748 00:59:07,040 --> 00:59:15,040 the number of bedrooms uh that we were looking for, but we did direct um 749 00:59:12,640 --> 00:59:18,480 applicants in our sort of workshop before, you know, when the RFP was 750 00:59:17,040 --> 00:59:23,280 released before submissions were received um to look at the needs 751 00:59:21,680 --> 00:59:28,720 identified in our housing element needs assessment. And one of those needs is 752 00:59:25,839 --> 00:59:35,280 rental housing for larger families. And so, um, the top three proposals were, 753 00:59:32,799 --> 00:59:38,720 um, responsive to working in those three-bedroom units. Okay. 754 00:59:36,960 --> 00:59:42,079 » And so, that was a that was also a factor, a positive factor. 755 00:59:40,240 --> 00:59:46,720 » Okay. So, that was included. So, on a related, is it your expertise, and maybe 756 00:59:44,960 --> 00:59:50,240 the applicants would know better, do the number of units ever influence the 757 00:59:48,400 --> 00:59:53,920 ability to get financing? I mean, you're talking about how this works for what we 758 00:59:52,559 --> 00:59:57,599 have identified as needing our community, but you got to be able to 759 00:59:55,839 --> 01:00:02,480 build the thing. So is there ever a correlation to the unit mix and types of 760 00:59:59,760 --> 01:00:04,640 financing or not really? and my I don't know if that's a question you can answer 761 01:00:03,839 --> 01:00:08,640 or the >> so the the best people to answer that 762 01:00:06,480 --> 01:00:13,440 question are over here but I will tell you that um yes my understanding is for 763 01:00:11,040 --> 01:00:17,839 instance like the ASIC opportunity that was mentioned there's a certain sweet 764 01:00:15,359 --> 01:00:22,480 spot based on the last nine rounds of of you know the number of units and so um 765 01:00:19,839 --> 01:00:27,440 our developers certainly were looking at um you know plugandplay what's what's 766 01:00:24,720 --> 01:00:30,880 going to work right um but yes again they can definitely expand 767 01:00:28,720 --> 01:00:35,760 » I saw nodding heads okay it seems that way But again trying to look at all the 768 01:00:32,799 --> 01:00:41,760 different aspects of this. Um another question is around sustainability 769 01:00:38,160 --> 01:00:45,520 features. So um s was talking a lot about the sustainability. Was that 770 01:00:43,119 --> 01:00:49,680 another part of the again I know the RF is written a certain way but I'm curious 771 01:00:47,599 --> 01:00:54,240 how staff responded to that because sustainability is important to the city 772 01:00:51,920 --> 01:00:58,079 of Sanfal. We have it in our goals and objectives. So I'm curious how that 773 01:00:55,760 --> 01:01:02,079 plays out in these applications. Um I believe that was one of the similarities 774 01:01:00,240 --> 01:01:06,720 across the three proposals. There might be distinct approaches unique to each. 775 01:01:04,480 --> 01:01:09,920 Um but you I feel like you're encountering some of the ch same 776 01:01:08,000 --> 01:01:14,400 challenges the review panel encountered that we had three strong proposals that 777 01:01:11,599 --> 01:01:19,119 had some significant similarities. >> So again just also understanding that 778 01:01:16,799 --> 01:01:24,880 when we get when it gets to the ENA those are also things that can be talked 779 01:01:21,040 --> 01:01:29,200 about as it's important to the city. Okay. 780 01:01:26,559 --> 01:01:33,119 And talked about that and then director Engle I think you alluded to this 781 01:01:30,720 --> 01:01:38,480 because Saha has done a lot of work in the region um but hasn't done anything 782 01:01:35,920 --> 01:01:43,280 in Marin and I'm curious from a staff standpoint from a development standpoint 783 01:01:41,599 --> 01:01:46,240 how does that I mean how do you react to that having folks that have been here a 784 01:01:44,799 --> 01:01:48,880 very long time that know Samal to someone who's new but also been 785 01:01:47,599 --> 01:01:53,200 successful and I know it's part of that grappling of the review panel but I'm 786 01:01:50,319 --> 01:01:56,880 I'm curious about that >> um I think like for all housing 787 01:01:54,720 --> 01:02:00,880 development we're looking for who can deliver a project. Um, you know, we've 788 01:01:59,119 --> 01:02:05,440 gone through this whole proposals for many years for Sanfell of entitlement 789 01:02:03,280 --> 01:02:09,920 but not constructed. So, for me, bringing in um 790 01:02:08,240 --> 01:02:13,920 seasoned development groups that actually can build and have housing 791 01:02:11,920 --> 01:02:18,640 occupied, that's that's really what we're looking for. So, um, both, you 792 01:02:16,480 --> 01:02:23,119 know, existing uh, partners who have been working Marin and Center for a long 793 01:02:20,319 --> 01:02:26,640 time, they've continuously done, but even for outside groups, we welcome them 794 01:02:24,799 --> 01:02:31,440 all. Um really what's the bigger question is what's what's Marin County 795 01:02:28,960 --> 01:02:34,960 need? We need all housing. Um okay. And really trying to find ways to get this 796 01:02:33,200 --> 01:02:38,880 particularly affordable housing. So that's why this you know kind of does 797 01:02:36,720 --> 01:02:42,160 open the door for us to be strategic about our approaches really looking at 798 01:02:40,640 --> 01:02:46,079 what other opportunities do we have within this community to find ways to 799 01:02:44,240 --> 01:02:48,319 bring in multiple development partners to bring this type of housing to the 800 01:02:47,440 --> 01:02:52,160 community. >> That's great. That's very helpful. And 801 01:02:49,599 --> 01:02:56,160 then my last question is and I know for sure each of the applicants referred to 802 01:02:53,839 --> 01:03:01,040 this the whole financing what do they call stack of it. So we know that 803 01:02:59,760 --> 01:03:04,720 because these three have come forward that you all looked at those financing 804 01:03:03,200 --> 01:03:09,280 stacks and that like these are all achievable. I mean for us we don't have 805 01:03:06,480 --> 01:03:16,079 enough information to Okay, because that is to your point, director, we have to 806 01:03:11,520 --> 01:03:21,520 be able it has to be able to be able Okay. So there wasn't a certain type of 807 01:03:19,520 --> 01:03:26,880 financing stack. It's just that it made sense to what we're asking for. 808 01:03:23,920 --> 01:03:32,799 » Yes. And and what I would say is these developers, all super experienced, all 809 01:03:29,520 --> 01:03:37,920 developers who work with tax credits, um and had a lot of similarities in the 810 01:03:36,240 --> 01:03:41,119 types of funding that they identified. And I think one of the things that we've 811 01:03:39,520 --> 01:03:48,640 seen with projects, affordable housing projects, is um there's 812 01:03:46,319 --> 01:03:53,440 the funding is also we're in a moment of change with state funding. And so I 813 01:03:51,200 --> 01:03:56,559 think like everyone has identified multiple opportunities. You saw one 814 01:03:54,960 --> 01:04:02,160 proposal that had like four different scenarios. Um and so it's kind of like 815 01:03:59,520 --> 01:04:05,119 depending on how the dust settles, >> we're going to, you know, we're going to 816 01:04:03,359 --> 01:04:09,920 go with um one of those funding scenarios and and there were um similar 817 01:04:07,440 --> 01:04:14,480 buckets identified across the teams. >> Okay, that's helpful. I don't have any 818 01:04:12,960 --> 01:04:19,839 questions at the moment. Do you have any other council member Bashi? Okay. So, 819 01:04:16,720 --> 01:04:26,079 with that, uh, we'll open up public Oh, yeah. Sorry. City Manager Natio. Yeah. 820 01:04:24,000 --> 01:04:31,280 » Yeah. Thank you. Uh, Paul Natio, city manager, as we move to the public 821 01:04:28,559 --> 01:04:36,240 comment, I wanted to go back to Mayor Kate's comment about, uh, this being an 822 01:04:33,200 --> 01:04:42,160 unusual process. Um, just want to add two more points. Uh, one, we're the 823 01:04:38,559 --> 01:04:48,480 owners of the property. Um, so that has certain implications. Um, also, uh, 824 01:04:46,160 --> 01:04:52,319 because we went through the RFP process and received some really strong 825 01:04:50,000 --> 01:04:57,280 proposals, we're also in this position because if any one proposal was head and 826 01:04:54,880 --> 01:05:03,200 shoulders, uh, we may be bringing that right to the city council. Um, the other 827 01:04:59,920 --> 01:05:08,640 part is wanting to have as transparent a process as possible. We could have had a 828 01:05:06,400 --> 01:05:13,599 um ad hoc subcommittee that's not required to meet uh under the Brown Act, 829 01:05:11,119 --> 01:05:18,319 but we chose to set it up this way in order to have as transparent a process 830 01:05:15,680 --> 01:05:21,760 as possible. So that with that comes some challenges. 831 01:05:20,000 --> 01:05:25,760 » Thank you. And I think it makes sense. I think then everyone understands what a 832 01:05:23,520 --> 01:05:30,640 good um issue to have of these three fantastic options. 833 01:05:28,160 --> 01:05:34,640 Um okay, so I'll open up public comment and as usual it's two minutes. You know, 834 01:05:33,200 --> 01:05:37,680 there's a timer. You're welcome, but not required to say your name and what part 835 01:05:36,000 --> 01:05:42,160 of Sanfell you're in. And you can both provide comments or input or question. 836 01:05:40,880 --> 01:05:46,720 We are interested in what you have to say. 837 01:05:45,039 --> 01:05:51,119 » Good evening. My name is Ken Dickinson. I'm a Sandrafell small business owner 838 01:05:48,799 --> 01:05:56,160 Bay Area Computer Training. For over 20 years, I worked directly with EH Housing 839 01:05:53,760 --> 01:06:00,720 as their enterprise systems trainer. From former CEO Mary MAG down to the 840 01:05:58,799 --> 01:06:05,839 property and maintenance teams on the ground across California and Hawaii. 841 01:06:03,440 --> 01:06:10,160 I've seen how they operate. That matters because a permanent 842 01:06:07,680 --> 01:06:14,799 supportive housing unit is only a home if someone is there to keep the tenants 843 01:06:11,920 --> 01:06:20,880 stable in the building safe. The June 2023 UC Berkeley Turner Center study, 844 01:06:18,640 --> 01:06:25,839 which Eden and Saha both participated in, found that understaffed supportive 845 01:06:23,039 --> 01:06:32,079 housing suffers nearly double the rate of rental delinquencies. And yet Eden is 846 01:06:28,559 --> 01:06:37,039 proposing 111 units with no documented on-site staff planning that I could see 847 01:06:33,920 --> 01:06:42,160 in their proposal. EA is the only finalist that answers this. A full-time 848 01:06:40,240 --> 01:06:47,119 resident service coordinator, a part-time case manager through Episcopal 849 01:06:44,880 --> 01:06:52,880 Community Services and a rent-free on-site manager unit guaranteed for the 850 01:06:49,440 --> 01:06:57,839 full 99-year lease. That's not a brochure promise. It's a staffing 851 01:06:54,880 --> 01:07:04,720 commitment on paper for the life of the building. Eh also wins on every other 852 01:07:01,039 --> 01:07:10,720 front. Deepest affordability at 45% AMI so residents can actually stay housed 853 01:07:07,599 --> 01:07:17,599 the lowest cost per unit. A three-story design that fits ordinance 1979's 854 01:07:14,319 --> 01:07:22,160 negotiated height limits. the neighborhood already bought into 855 01:07:19,839 --> 01:07:27,760 that proposal there and a faster timeline that avoids the litigation risk 856 01:07:24,720 --> 01:07:32,240 and six figure per unit penalties tied to Eden's high density design which by 857 01:07:30,640 --> 01:07:38,000 the way they have the option to expand that as I understand it six stories 858 01:07:35,599 --> 01:07:44,480 they're local accountable already proven in neighborhoods like ours for 350 859 01:07:40,880 --> 01:07:51,119 mirale I urge this subcommittee to support EAH housing thank Thank you. 860 01:07:49,119 --> 01:07:54,319 » Thank you. And thank you for providing very 861 01:07:52,480 --> 01:07:57,280 specific input. And what I'm thinking again, this is such an unusual 862 01:07:55,680 --> 01:08:01,440 situation. So after we have all the public comment, so each of the the 863 01:07:59,200 --> 01:08:05,039 applicants will have an opportunity to not have a long speech, but two or three 864 01:08:03,280 --> 01:08:08,720 minutes to just maybe respond to what you're hearing because um especially if 865 01:08:06,640 --> 01:08:14,452 it's that specific. So thank you. Go ahead, Mariana. 866 01:08:09,839 --> 01:08:20,347 » Good evening, uh council staff. Um [clears throat] I am Marian Nanastad 867 01:08:16,239 --> 01:08:23,839 from San Rafal Meadows and um [clears throat] I first want to comment 868 01:08:21,759 --> 01:08:28,080 on the community engagement that both Mr. Hinkle and each of the presenters 869 01:08:25,839 --> 01:08:33,920 have presented that I am looking forward to that we will have uh community 870 01:08:30,799 --> 01:08:38,960 engagement with this. So thank you. While density is a valuable goal, the 871 01:08:35,759 --> 01:08:43,679 primary mission of the 350 Midel project is to provide a permanent home for our 872 01:08:41,199 --> 01:08:48,080 unhoused and special needs neighbors. For this mission to succeed, EAH housing 873 01:08:46,159 --> 01:08:55,679 is the only developer that has submitted a proposal built on operational reality. 874 01:08:52,159 --> 01:08:59,920 The June 2023 Turner Center study, which actually included data from the other 875 01:08:57,600 --> 01:09:04,400 finalist, reveals that under re underresourced properties with fewer 876 01:09:01,839 --> 01:09:08,960 on-site staff suffer from nearly double the rate of rental delinquencies and 877 01:09:06,400 --> 01:09:14,000 significantly higher moveout rates. Without intens intensive on-site 878 01:09:11,759 --> 01:09:18,080 stewardship, the most valuable residents are at high risk of cycling back into 879 01:09:16,560 --> 01:09:22,640 homelessness. Eahh proposal directly addresses these 880 01:09:20,319 --> 01:09:28,467 risks. First, they target the deepest level of affordability with an average 881 01:09:24,719 --> 01:09:30,799 of 45% AMI, ensuring units remain re [clears throat] 882 01:09:29,040 --> 01:09:34,480 uh reachable for those with the greatest needs. Second, they are the only 883 01:09:32,640 --> 01:09:38,080 finalist to document a clear tiered on-site support team, a full-time 884 01:09:36,239 --> 01:09:42,799 resident services coordinator, a dedicated case manager through Episcopal 885 01:09:40,880 --> 01:09:48,480 Community Services, and a rent-free on-site manager unit to ensure 247 886 01:09:45,839 --> 01:09:52,480 building stewardship. A 99-year lease is a century long commitment. We should not 887 01:09:50,480 --> 01:09:57,040 select a developer offering a vague menu of services without a documented 888 01:09:54,560 --> 01:10:02,400 headcount. I urge this sub subcommittee to prioritize long-term stability over 889 01:09:59,199 --> 01:10:08,760 mere units counts by advancing the EA proposal. Thank you. 890 01:10:05,520 --> 01:10:08,760 » Thank you. 891 01:10:11,600 --> 01:10:18,000 » Hi, my name is Jennifer Wallace. I don't know if it's possible to go to the Eden 892 01:10:15,600 --> 01:10:22,560 deck uh and bring up the slide where they showed the rendering from the yard 893 01:10:20,640 --> 01:10:27,679 if that's possible while I make some comments. Um I too support the EAH 894 01:10:25,360 --> 01:10:33,520 proposal. They seem to have addressed all the elements in the most balanced 895 01:10:29,760 --> 01:10:38,640 way and um you know really excited to see their commitment to the 896 01:10:35,600 --> 01:10:43,760 environmental aspect of this and um really loved the concept of the three 897 01:10:41,360 --> 01:10:49,120 stories you know uh and the reason I was hoping to bring up the Eden deck is that 898 01:10:46,080 --> 01:10:54,000 rendering from that was my house by the way in the picture um that's not what 899 01:10:51,840 --> 01:10:58,080 five and six stories looks like and to count in their rendering that was is a 900 01:10:55,760 --> 01:11:02,320 six-story building that they modeled and that's not what five and six stories 901 01:10:59,679 --> 01:11:08,400 looks like from my backyard and from our street and a couple streets over. It's 902 01:11:04,480 --> 01:11:14,080 it's a lot more imposing than that. So what I saw from the EAH version and also 903 01:11:10,960 --> 01:11:20,960 understanding that designs can shift um but but that their opening approach was 904 01:11:17,920 --> 01:11:25,199 recognizing the neighborhood feel and trying to fit into that as the other 905 01:11:22,960 --> 01:11:29,199 apartments do along Maryale already at two and three stories plus also 906 01:11:27,520 --> 01:11:33,040 addressing parking all the other elements. Um really appreciated that. So 907 01:11:31,679 --> 01:11:36,280 thank you. >> Thank you. 908 01:11:40,239 --> 01:11:46,719 Good evening. My name is Gregory Andrew and I live in Sanfell Meadows. And um I 909 01:11:44,640 --> 01:11:53,280 think you just heard uh three very powerful and compelling reasons to 910 01:11:49,199 --> 01:11:58,080 support the EAH uh uh proposal and uh select EAH as the developer for this 911 01:11:55,360 --> 01:12:04,239 site. I uh find that after reviewing these that uh the eh proposal would be 912 01:12:00,880 --> 01:12:08,800 the most uh affordable housing for the targeted population and it would be the 913 01:12:06,480 --> 01:12:16,640 most compatible with the neighborhood. I think what you have before you is a 914 01:12:11,600 --> 01:12:22,800 choice of uh we do own this property and so there is an opportunity to develop a 915 01:12:20,719 --> 01:12:29,440 site that is compatible with the neighborhood or a project that imposes 916 01:12:26,480 --> 01:12:34,239 upon the neighborhood. And I find that I find that the uh the Eden and Saha 917 01:12:32,560 --> 01:12:38,400 developments seem to be out of character. they're too big and just 918 01:12:36,719 --> 01:12:43,120 their look of them are out of character with the neighborhood. I did hear EAH 919 01:12:40,800 --> 01:12:48,800 talk about the environmental approach and utilizing um uh what's already 920 01:12:46,880 --> 01:12:53,440 there. I found that to be very uh interesting. I also heard EAH make 921 01:12:50,880 --> 01:12:58,880 reference to the pedestrian path. So I don't think that is unique to uh to uh 922 01:12:57,440 --> 01:13:03,120 actually all three of them did. So I don't think that is unique to Eden. I 923 01:13:01,280 --> 01:13:07,840 have uh some questions I'd like to address and I'll hand these over to to 924 01:13:05,199 --> 01:13:11,679 the staff which is what uh what were the proposals of the two developers that 925 01:13:09,520 --> 01:13:16,640 were not selected in finalists Pacific Companies and Samuel Group please give 926 01:13:13,920 --> 01:13:21,360 us some detail on those proposals uh a pedestrian path for the smart Meridale 927 01:13:19,040 --> 01:13:26,560 smart station was not part of the EF RFP. How was it that Eden came to to 928 01:13:24,080 --> 01:13:32,719 propose developing this path and were the other developers aware of this? Um 929 01:13:29,280 --> 01:13:37,360 the evaluation group, the evaluation committee panel was uh city, county and 930 01:13:35,679 --> 01:13:41,679 chamber of commerce. So with the chamber of commerce, why was no community 931 01:13:39,440 --> 01:13:44,640 neighborhood u representative where there there could have been and there 932 01:13:43,040 --> 01:13:47,679 should have been. So why don't you finish with No, go ahead and finish your 933 01:13:46,320 --> 01:13:52,320 questions because this is a chance >> and then uh what I'd like to see more 934 01:13:50,080 --> 01:13:58,320 detail on the development scores. You summarized them. They were Eden and EAH 935 01:13:55,600 --> 01:14:04,239 were extremely close. So I'd like to see uh if I could the details on those 936 01:14:00,560 --> 01:14:08,000 developments on those scoring. That's it. Thank you very much. 937 01:14:05,360 --> 01:14:11,960 » Okay. Thank you. >> Other questions or comments? 938 01:14:18,320 --> 01:14:27,120 Good evening. My name is Janet Shirley and I live two blocks from the 350 939 01:14:23,440 --> 01:14:32,480 Midell site in Sanfeld Meadows. I'm here to not to talk about floor 940 01:14:29,440 --> 01:14:37,760 plans or how many units. I'm here to talk about what happens after the ribbon 941 01:14:34,719 --> 01:14:41,920 is cut on this project because that's when the project actually becomes 942 01:14:39,840 --> 01:14:46,000 somebody's home. I've watched our city change. I've 943 01:14:43,920 --> 01:14:52,560 watched buildings go up with big promises that disappear once the 944 01:14:48,960 --> 01:14:57,440 developer moves on to the next site. What I haven't seen enough of is a 945 01:14:54,719 --> 01:15:03,120 promise to actually stay, to have someone on site when a senior falls or 946 01:15:00,719 --> 01:15:06,480 when a crisis develops at 2:00 a.m. in the morning. 947 01:15:04,960 --> 01:15:12,320 EA is the only proposal with full-time 948 01:15:09,120 --> 01:15:18,159 onsite staff and a resident manager who actually is going to live there, not one 949 01:15:15,280 --> 01:15:22,880 who simply clocks in and clocks out. It's the only one reaching the deepest 950 01:15:20,320 --> 01:15:30,239 affordability so that families who need this housing most can afford to stay. 951 01:15:27,120 --> 01:15:35,280 And it does this at the lowest cost to taxpayers in a design that fits the 952 01:15:33,199 --> 01:15:41,040 scale that this neighborhood already agreed to and wants. This community 953 01:15:38,400 --> 01:15:46,480 deserves more than just a building. We deserve a partner who will be answering 954 01:15:42,800 --> 01:15:51,520 the phone year after year after year for years to come. 955 01:15:48,159 --> 01:15:55,440 not just a partner who wins the bid. So when this council weighs these 956 01:15:53,120 --> 01:16:02,560 proposals, I'm asking you to look past the rendering and the unit counts. EAH 957 01:16:00,000 --> 01:16:06,880 housing is local. EH housing has already proven itself in 958 01:16:05,120 --> 01:16:12,960 our neighborhoods and EH EAH housing is the only finalist 959 01:16:11,040 --> 01:16:18,719 that has built in the promise of long-term care into its proposal instead 960 01:16:16,400 --> 01:16:23,120 of just a pitch. Because the difference between a housing 961 01:16:21,040 --> 01:16:29,440 project and a home isn't the number of units, it's whether somebody's there to 962 01:16:26,239 --> 01:16:36,480 answer the door year after year. I urge you to select eh housing as the 963 01:16:33,040 --> 01:16:40,080 developer 3 for 350 Mary. Thank you. >> Thank you. And to be clear, we're not 964 01:16:37,840 --> 01:16:47,719 making any selection this evening, but I appreciate the phrasing. Okay. Just want 965 01:16:42,320 --> 01:16:47,719 to make that very clear. Anyone else? 966 01:16:49,360 --> 01:16:56,480 » My name is Wayne Rabin. I live in San Meadows. Good evening members of 967 01:16:53,840 --> 01:17:01,760 subcommittee staff. While Eden Housing has rec been 968 01:16:58,480 --> 01:17:07,280 recognized with its 111 units density, we must look beyond physical blueprints 969 01:17:04,000 --> 01:17:12,640 and long-term operation safety. Despite pre o proposing the largest, most 970 01:17:09,360 --> 01:17:18,640 expensive project at $98 million. Eden proposal fails to document a dedicated 971 01:17:15,600 --> 01:17:25,280 on-site manager or residential service staff member. We cannot run highdensity 972 01:17:21,360 --> 01:17:30,560 housing on autopilot. The June 2023 terror center report, a study Eden 973 01:17:28,480 --> 01:17:36,239 itself participated in, reveals that underresourced, understaffed properties 974 01:17:33,440 --> 01:17:42,719 suffer nearly double the rate of rental discrepancies, delinquencies, and 975 01:17:38,640 --> 01:17:47,440 sufficiently higher early exit rates. Without trained on staff personnel to 976 01:17:44,800 --> 01:17:53,360 bring community and descalate crisis, these projects face severe 977 01:17:50,320 --> 01:17:58,480 tenant instability, rapid staff burnout and costly property damagement 978 01:17:55,520 --> 01:18:03,280 preventable by fires and flooding. So developers as developers present the 979 01:18:01,120 --> 01:18:09,040 proposal tonight urge the subcommittee to demand absolute transparent team 980 01:18:06,560 --> 01:18:14,640 regarding the staff and gap. Before we proceed the developer section this fall, 981 01:18:11,520 --> 01:18:19,760 we must secure binding commitments for on staff staffing, headc counts, 982 01:18:17,280 --> 01:18:25,760 accountability measures, and operational budgets. We must prioritize long-term 983 01:18:22,640 --> 01:18:33,679 neighborhood safety and tenant safety over mere unit counts. Also, needen has 984 01:18:29,360 --> 01:18:42,679 the most units. More units equal more traffic, which we do not need. 985 01:18:37,840 --> 01:18:42,679 Thank you. Any other comments? 986 01:18:46,560 --> 01:18:55,760 » Good evening. Uh Joe O'Hare and I'm a 36-year resident of the eastern part of 987 01:18:52,719 --> 01:19:01,360 San Rafell and Peacock Gap. Uh I was the former CEO of Vivivalon. And when I 988 01:18:58,560 --> 01:19:05,199 retired, I decided what I was going to do with my volunteer community service 989 01:19:03,199 --> 01:19:09,760 work. And what was presented by the staff at the beginning of this 990 01:19:07,120 --> 01:19:14,640 presentation is what really made me passionate about working and trying to 991 01:19:12,000 --> 01:19:21,600 get more affordable and the right type of housing in in uh in San Rafale and in 992 01:19:17,600 --> 01:19:25,440 Marin County. Um as a result um I went on the board of directors of Eden 993 01:19:23,360 --> 01:19:29,760 Housing. I've served there for three years and I'm also on the board of 994 01:19:26,960 --> 01:19:35,280 directors of Calmer and Home which is a strategic collaborative initiative of 40 995 01:19:32,719 --> 01:19:40,719 nonprofits with the intent to try to remove the barriers so we can build more 996 01:19:38,159 --> 01:19:47,040 affordable and workforce housing in all of our communities in Mirin. Uh why Eden 997 01:19:45,199 --> 01:19:51,040 Housing? Why did I choose them? Obviously I did a project with them. I 998 01:19:48,800 --> 01:19:56,239 spent 15 years working with them as the city did in building the the healthy 999 01:19:53,440 --> 01:20:01,120 aging campus in downtown San Rafale and I welcome anybody to go look at uh the 1000 01:19:59,199 --> 01:20:04,960 residents, talk to the residents there, see what's done there. The mission of 1001 01:20:02,960 --> 01:20:08,960 Eden Housing is home is just the beginning and if you go over and see 1002 01:20:07,120 --> 01:20:12,239 what the services and the support and the full-time resident services that are 1003 01:20:10,800 --> 01:20:17,520 there, it'll answer many of the questions that the community has. Um, 1004 01:20:15,440 --> 01:20:21,120 also the city has worked with Eden Housing. As pointed out, we've we've 1005 01:20:19,199 --> 01:20:25,679 built over a hundred affordable housing units. Not only that one, but the one in 1006 01:20:22,880 --> 01:20:30,560 Cass Canal. They have over 200 other projects in development. 1007 01:20:28,080 --> 01:20:34,560 And I can tell you that um when we were selecting our affordable housing 1008 01:20:32,400 --> 01:20:38,880 partner, I spent a year going all over the Bay Area and looking at affordable h 1009 01:20:36,400 --> 01:20:43,760 nonprofit affordable housing developers. And when we just kept coming back and we 1010 01:20:41,199 --> 01:20:48,000 did an RFP like the city did and we selected Eden Housing because we saw 1011 01:20:46,080 --> 01:20:53,440 they were problem solvers. They're in their communities for a long period of 1012 01:20:50,000 --> 01:20:57,600 time. And uh I I do believe and I will tell you all that as a board member and 1013 01:20:55,280 --> 01:21:02,800 as a resident, I'll make sure that this project is the best that it can be and 1014 01:21:00,400 --> 01:21:07,440 be as good as the one we did at at the Healthy Aging Campus. Thank you. 1015 01:21:05,360 --> 01:21:12,040 » Thank you. Anyone else like to speak? 1016 01:21:18,320 --> 01:21:24,719 » Good evening, mayor, council members, staff. My name is Nicole Gardillo. I am 1017 01:21:23,040 --> 01:21:29,920 a field representative with the North Coast State Carpenters Union at Lago 1018 01:21:26,880 --> 01:21:33,840 751, which covers Marin County. I'm here tonight to talk about labor standards 1019 01:21:32,000 --> 01:21:38,320 and why it should be implemented here in San Rafael. We all agree that we need 1020 01:21:36,239 --> 01:21:42,800 more affordable housing in Min County, but we must also pay attention on how it 1021 01:21:40,480 --> 01:21:47,600 is built. Meaningful labor labor standards in play means that there will 1022 01:21:45,040 --> 01:21:52,560 be responsible con contractor that provides livable wages, health care, and 1023 01:21:50,400 --> 01:21:57,360 apprenticeship programs that may help build the future. These are not just 1024 01:21:55,040 --> 01:22:01,760 protection for workers. They are investments in the quality, safety, and 1025 01:21:59,920 --> 01:22:06,480 durability of the structures that are being built for our community. Let us 1026 01:22:04,000 --> 01:22:11,280 make sure that this project reflects our city's values. Please ensure that this 1027 01:22:09,280 --> 01:22:15,600 project will be built by a responsible contractor that includes labor 1028 01:22:12,719 --> 01:22:21,120 standards. Thank you. >> Thank you. 1029 01:22:18,560 --> 01:22:26,719 Any other comments or questions that anyone has? 1030 01:22:24,239 --> 01:22:30,000 Okay, I don't see any. I'll close the public comment. And as I said at the 1031 01:22:28,480 --> 01:22:34,080 beginning, I would have thought about it in the very beginning, but as I said, 1032 01:22:31,280 --> 01:22:37,679 it's an unusual proceeding. Um, I would like to give the each of the applicants 1033 01:22:36,080 --> 01:22:40,560 an opportunity just to say a few more words. You you heard public comment. 1034 01:22:39,520 --> 01:22:43,360 You've been sitting there thinking about other things like, "Oh, I should have 1035 01:22:41,760 --> 01:22:47,440 said that or I'd like to say this." This is your chance to do that. And we'll 1036 01:22:45,440 --> 01:22:53,840 just go in the same order. So, Nor, if you want to go up or or someone from 1037 01:22:50,480 --> 01:22:58,080 your team, however you want to do it. >> Uh, no, thank you. uh just really 1038 01:22:55,679 --> 01:23:03,280 appreciate this opportunity um to be here. I agree this is um unique 1039 01:23:01,280 --> 01:23:07,520 um for San Rafll to go through this process, but I think it's great. I will 1040 01:23:04,880 --> 01:23:12,239 say um I've gone through some similar processes now in other cities where they 1041 01:23:09,199 --> 01:23:15,360 put out an RFP and we come and do this and so uh you're right in line with with 1042 01:23:14,159 --> 01:23:20,400 a lot of other cities doing a lot of really cool things. So 1043 01:23:16,960 --> 01:23:24,400 » very awesome. Um uh I I think really the only other thing I wanted to mention was 1044 01:23:22,480 --> 01:23:29,360 um you know we even though we're waiting to see this process through we are still 1045 01:23:27,120 --> 01:23:32,639 you know wanting to consider our own due diligence as well. And so you know we 1046 01:23:30,800 --> 01:23:36,880 are in touch with the Lascalina sanitary district I would like to also find out 1047 01:23:34,320 --> 01:23:41,600 what that easement is if it's necessary not necessary you know that is why we 1048 01:23:39,280 --> 01:23:45,679 designed it in a way where um you know we didn't have to worry about it should 1049 01:23:42,960 --> 01:23:48,800 they need it. Um but you know we are in conversation with them and and we'll 1050 01:23:47,040 --> 01:23:51,920 we've sent them some of our plans just so they can let us know like oh yeah 1051 01:23:50,080 --> 01:23:59,040 this is what we're doing with it or not. Um uh and then um as far as uh you know 1052 01:23:56,639 --> 01:24:04,320 the the pedestrian path um I know that that did come up and um yeah absolutely 1053 01:24:02,080 --> 01:24:07,920 like our goal um like I mentioned is to make sure that we have good connection 1054 01:24:06,000 --> 01:24:12,560 to transit because our residents are going to need it. Um and so it's just 1055 01:24:10,080 --> 01:24:17,360 very critical for us. Um, I will say the the reason maybe we didn't bring up um 1056 01:24:14,960 --> 01:24:24,239 AHSC specifically in our funding stack that you saw is because it is um uh for 1057 01:24:21,280 --> 01:24:28,080 now it it no longer exists. Um there is a possibility maybe it'll come back in a 1058 01:24:25,920 --> 01:24:32,480 different form or they'll reverse their decision on the greenhouse gas reduction 1059 01:24:29,840 --> 01:24:37,760 fund at the state but as of now um we are not counting on AHSC. So, we wanted 1060 01:24:35,440 --> 01:24:42,159 to think through what else do we have available to us. Um, and you know, we we 1061 01:24:40,400 --> 01:24:46,080 will also keep an eye on what kind of funding will come through should Prop 1 1062 01:24:44,000 --> 01:24:48,639 pass on the ballot in November and the programs that'll get funded, which will 1063 01:24:47,440 --> 01:24:52,560 include some infrastructure grant funding. Um, so that might be a 1064 01:24:50,159 --> 01:24:56,400 possibility. Um, but again, you know, we just wanted to make sure we had enough 1065 01:24:54,719 --> 01:24:59,040 paths forward where, you know, if one didn't work, we had another one that we 1066 01:24:57,840 --> 01:25:04,400 could fall back on. And so that's why you saw those four paths um and not the 1067 01:25:00,960 --> 01:25:07,600 the ASIC program in there. Um, don't think I had anything else. If there's 1068 01:25:06,159 --> 01:25:11,520 any other questions that you had for me, happy to answer those, but any I don't 1069 01:25:10,239 --> 01:25:16,639 know if the team had anything else to add. 1070 01:25:13,679 --> 01:25:19,760 » Oh, yes. The Yeah, we we were very um intentional about the adaptive reuse is 1071 01:25:18,400 --> 01:25:23,600 just, you know, something I'm very interested in trying out um in our team, 1072 01:25:22,000 --> 01:25:27,840 Studio Tsquare, which we also worked on on the Northgate Mall project. So 1073 01:25:25,040 --> 01:25:32,080 they're very um well verssed in the area and in the in the land and the the law 1074 01:25:29,760 --> 01:25:36,159 itself and also the the connectivity to transit um because they were our part 1075 01:25:33,920 --> 01:25:38,960 our thought partner there. Um but yeah, we would love to keep exploring that 1076 01:25:37,679 --> 01:25:42,880 with the city because we we don't actually know what the plan is for your 1077 01:25:40,639 --> 01:25:45,760 interim housing. And so if those are not going to be around, that's okay. We'll 1078 01:25:44,159 --> 01:25:48,960 we'll figure something out. But if they are available, it'd be great to think 1079 01:25:47,360 --> 01:25:54,159 through what we can do with those. um you know as community center space um as 1080 01:25:52,080 --> 01:25:58,719 you know um just space for the the residents to be able to to do really fun 1081 01:25:56,400 --> 01:26:00,880 activities um potentially use it for neighborhood meetings that kind of 1082 01:26:00,000 --> 01:26:04,719 thing. So >> yeah, thank you. 1083 01:26:01,600 --> 01:26:09,120 » Thank you. Thank you for that. >> Tammy, do you want to speak or member of 1084 01:26:07,040 --> 01:26:14,000 your team? Thank you. >> Hi. Thanks again. Thanks for having us 1085 01:26:10,960 --> 01:26:19,280 back to uh respond. Uh I heard three things tonight uh about resident 1086 01:26:15,760 --> 01:26:24,880 services, the path to the smart train uh station and the height of the building. 1087 01:26:21,840 --> 01:26:30,000 Um it is amazing to have this level of involvement from neighbors um this early 1088 01:26:27,440 --> 01:26:38,000 in the process and thank you all for coming um to express your concerns and I 1089 01:26:35,360 --> 01:26:43,199 uh would really encourage everybody to take up Joe Joe's invitation to visit 1090 01:26:40,239 --> 01:26:48,639 Vivolon or to visit Kasa Canal because you will see at those uh properties like 1091 01:26:46,000 --> 01:26:55,040 all of our 160 properties there are on-site resident services managers who 1092 01:26:51,040 --> 01:27:01,679 live at the property 24 hours a day. So, um we have on staff janitorial, property 1093 01:26:58,400 --> 01:27:07,280 management, resident services, and even third party services whose jobs are to 1094 01:27:04,320 --> 01:27:13,199 be at our building 24 hours. I mean, not well, it's se seven days a week. Um but 1095 01:27:10,960 --> 01:27:19,280 there is a 24-hour resident services manager on site at all of our 1096 01:27:15,440 --> 01:27:24,880 properties. Um because that is um that is the true because all of our uh our 1097 01:27:23,120 --> 01:27:31,199 residents need services and they need support so that we can um keep them 1098 01:27:27,840 --> 01:27:35,920 there happily and sustainably. Um I'm going to turn it over. Oh, I one thing 1099 01:27:33,199 --> 01:27:42,400 about path station. Our proposal originally talked about establishing a 1100 01:27:39,120 --> 01:27:47,280 pedestrian connection from the property to the path station. Uh the city got 1101 01:27:45,600 --> 01:27:52,719 back to us and said, "You know what? The city's already thinking about this. If 1102 01:27:49,760 --> 01:27:57,199 the city should um find the money to do this to do this path, would you consider 1103 01:27:55,760 --> 01:28:02,239 doing bicycle and pedestrian improvements according to the city's uh 1104 01:28:00,080 --> 01:28:06,400 pedestrian and bicycle plan that go north to San Pedro Road?" And that is we 1105 01:28:04,639 --> 01:28:10,320 said yes, and we will take a look at that. Um I just wanted to clear that up 1106 01:28:08,800 --> 01:28:13,760 because I know there was two different slides on that. And I'm going to turn it 1107 01:28:12,000 --> 01:28:17,840 over to Rick to talk about the height of the building because 1108 01:28:15,600 --> 01:28:19,920 » just a short response out of my wheelhouse. 1109 01:28:18,400 --> 01:28:25,920 » Okay. Just a short response. >> Very short. So, one of the things we did 1110 01:28:22,400 --> 01:28:32,320 is we tried to show the uh we modeled the building, placed it in the the site 1111 01:28:29,840 --> 01:28:35,520 so that people could get a real honest appearance of what it looks like at 1112 01:28:34,239 --> 01:28:39,679 different heights. It was actually a fivetory scheme that we modeled. We 1113 01:28:38,080 --> 01:28:43,920 actually modeled a six-story scheme, too. and we saw the height of it and 1114 01:28:41,600 --> 01:28:49,120 lessened it. People get honest tradeoffs. We did that with Bivivalon 1115 01:28:46,159 --> 01:28:53,679 and we do it with Fairfax Mil Valley. We do it with all of our projects. So, they 1116 01:28:50,719 --> 01:28:58,239 get an honest review and it's very transparent and if they ask us to take 1117 01:28:56,159 --> 01:29:03,840 it from the backyard, we will take the image from the backyard and show it to 1118 01:29:00,000 --> 01:29:08,159 them personally. Um, also there are a lot of people in the community of San 1119 01:29:05,440 --> 01:29:13,920 Rafale. The community isn't just along Midell. it's within the whole city and 1120 01:29:12,159 --> 01:29:19,920 you're providing housing for the whole community. So, there are tradeoffs to be 1121 01:29:17,600 --> 01:29:25,920 had. Do you how do you maximize the value of the site for the city to use uh 1122 01:29:23,920 --> 01:29:31,840 their dollars in purchasing the property? There are also community 1123 01:29:28,239 --> 01:29:36,719 members that will live here eventually. And every time I complete a project, I 1124 01:29:34,800 --> 01:29:40,560 think, well, yes, we took we got the project approved 1125 01:29:38,639 --> 01:29:47,280 and we took a story off the building and we can do that and still achieve a high 1126 01:29:43,199 --> 01:29:53,120 unit count. If you remove 30 units from the development and it's 80 unit 1127 01:29:49,760 --> 01:29:58,400 project, the one group of people you don't ever have to ask a question or 1128 01:29:55,040 --> 01:30:04,000 answer a question of is why don't I have a house to live in? and those residents, 1129 01:30:01,920 --> 01:30:08,560 future residents, many of who might have already been 1130 01:30:05,920 --> 01:30:12,880 Sanfell residents don't get to speak for that answer. And 1131 01:30:11,360 --> 01:30:16,000 I think that's a really important thing to consider. So there'll be tradeoffs in 1132 01:30:14,880 --> 01:30:22,239 this process. Y >> nobody's wetted to the new design and 1133 01:30:19,360 --> 01:30:28,480 each of the developers would do a good job. we were a we decided to proceed 1134 01:30:25,760 --> 01:30:32,239 with a larger development so that we could have the conversation, have the 1135 01:30:30,320 --> 01:30:33,280 tradeoffs and work with the community on it. 1136 01:30:32,480 --> 01:30:41,560 » Thank you. >> Thank you, Ray. 1137 01:30:35,360 --> 01:30:41,560 And then um Eve. Yeah. Thank you. 1138 01:30:44,080 --> 01:30:52,480 » Thank you again. I guess it just in conclusion um I'd like you to take away 1139 01:30:49,679 --> 01:30:55,520 um from our proposal that you know Saha has a very strong presence in the 1140 01:30:53,840 --> 01:31:01,920 region. We have an excellent track record. We are a very hands-on um 1141 01:30:58,719 --> 01:31:06,239 organization and and developer. Myself, my CEO and all our senior leadership 1142 01:31:03,920 --> 01:31:10,800 team are involved in these projects. We have a really experienced staff. Um our 1143 01:31:08,480 --> 01:31:15,199 senior project manager Naan who's here um has worked on several ASIC projects 1144 01:31:12,880 --> 01:31:20,159 and done really beautiful communities again from San Jose to penol um and 1145 01:31:17,760 --> 01:31:24,800 we've augmented our team with uh folks who have a long history in the city um 1146 01:31:23,040 --> 01:31:28,239 and a lot of local expertise. So April Paley who will be part of our community 1147 01:31:26,159 --> 01:31:34,400 outreach and planning and design work going forward as well as Chris Hes. Um, 1148 01:31:31,760 --> 01:31:38,000 and I do want to clarify that we have budgeted for this project to have 1149 01:31:35,920 --> 01:31:41,840 full-time property management, full-time services coordination as well as 1150 01:31:39,600 --> 01:31:46,480 maintenance. Um, and we do have capacity within our services department to 1151 01:31:44,000 --> 01:31:51,679 provide case management for folks who need a little extra support. We do have 1152 01:31:48,960 --> 01:31:55,440 um a licensed clinical uh social worker who supervises all our resident service 1153 01:31:53,840 --> 01:32:00,560 coordinators so that they can get support and um extra resources when 1154 01:31:58,560 --> 01:32:04,480 families or individuals are needing that support. Um, we're also very adept at 1155 01:32:02,560 --> 01:32:07,760 working with other community partners and we've already started that process 1156 01:32:05,920 --> 01:32:11,520 by communicating and reaching out to Canel Alliance and Ritter Center to 1157 01:32:09,679 --> 01:32:14,719 think about, oh, folks need additional help, what are the resources in the 1158 01:32:13,120 --> 01:32:20,000 community and sort of building those connections um and broad-based community 1159 01:32:17,360 --> 01:32:27,199 support. Uh, one last thing is we do have uh 24-hour coverage for maintenance 1160 01:32:23,440 --> 01:32:32,000 or other emergencies and we um have a a way to we have a text system so that we 1161 01:32:30,639 --> 01:32:36,480 can communicate directly with residents so folks can sign up to get alerts and 1162 01:32:33,920 --> 01:32:40,719 announcements from us about activities um opportunities as well as important 1163 01:32:38,719 --> 01:32:46,719 safety alerts again if something happens. A couple last fall we had a 1164 01:32:42,560 --> 01:32:49,840 tsunami warning um for the bay and uh we immediately were able to push out to all 1165 01:32:48,239 --> 01:32:53,600 our residents who lived potentially in that zone and let them know make sure 1166 01:32:51,360 --> 01:32:58,239 they had seen the county warnings um and mobilize quickly there. So um again, 1167 01:32:56,159 --> 01:33:02,480 we'd love to work with you and we welcome the opportunity to engage with 1168 01:33:00,480 --> 01:33:07,120 neighbors as soon as we can so that we can plan um for their needs and be 1169 01:33:04,880 --> 01:33:10,800 responsive and deliver a really outstanding project for the community. 1170 01:33:09,520 --> 01:33:13,920 Thank you. Thank you and thank you for providing 1171 01:33:12,639 --> 01:33:19,840 that additional information. I think it's nice to have the opportunity to add 1172 01:33:16,320 --> 01:33:25,600 in and to respond. So, we'll bring it back for subcommittee 1173 01:33:22,800 --> 01:33:29,040 discussion and comments. I can see why you wanted to bring all of us into this 1174 01:33:27,120 --> 01:33:32,960 conversation. This is not an easy one. I do have two questions. Um, and maybe you 1175 01:33:31,280 --> 01:33:37,040 can just speak to this. There were assumptions being made about who will be 1176 01:33:34,880 --> 01:33:41,440 living here and I know we have other 100% affordable projects in Sanfell and 1177 01:33:40,239 --> 01:33:44,239 so I don't know if the assumption is always accurate that there are people 1178 01:33:42,480 --> 01:33:49,280 that were formerly homeless. So maybe you could just speak to who the 80 1179 01:33:46,320 --> 01:33:54,480 people might be and it might change over time. Um and then I would also be 1180 01:33:52,080 --> 01:33:58,840 curious what height is allowable by current zoning standards. 1181 01:34:00,880 --> 01:34:08,639 Yeah, thank you for the clarifying question. Um, because affordable housing 1182 01:34:05,920 --> 01:34:15,360 certainly can serve people who were formerly homeless um or at risk of 1183 01:34:11,280 --> 01:34:19,440 homelessness. um but also often serves um 1184 01:34:17,199 --> 01:34:24,560 every everyone really like um some of the examples we gave we gave in our 1185 01:34:21,120 --> 01:34:28,639 slides right were home health aids and um you know people who work retail or 1186 01:34:26,639 --> 01:34:33,520 people who are in food service or so it's it's an expansive 1187 01:34:31,040 --> 01:34:38,560 group that can live there and is a part of the community 1188 01:34:36,239 --> 01:34:44,560 » and so do our other affordable I'm just saying center town are there um onsite 1189 01:34:41,600 --> 01:34:46,880 case managers because I I'm just trying to figure out because I think that's a 1190 01:34:45,600 --> 01:34:51,199 really interesting comment that the community talked about or on-site 1191 01:34:49,360 --> 01:34:55,040 property managers or just the stability part the additional staffing. Do our 1192 01:34:52,960 --> 01:34:59,520 other affordable 100% affordable projects have that. 1193 01:34:56,639 --> 01:35:04,159 » So I think it depends on the project and the sort of level affordability and like 1194 01:35:02,239 --> 01:35:08,400 if there's permanent supportive housing, right? So, permit supportive housing is 1195 01:35:05,920 --> 01:35:15,120 going to have an additional um layer of support or like um more robust support. 1196 01:35:12,320 --> 01:35:19,760 Um and I think some of these proposals had said, 1197 01:35:17,679 --> 01:35:22,880 you know, if vouchers become available, we're happy to look at additional 1198 01:35:21,280 --> 01:35:26,639 permanent supportive housing, right? Ramping that up. Right now, we don't 1199 01:35:24,639 --> 01:35:32,719 have that voucher availability. And so I think that's why um it might have come 1200 01:35:29,120 --> 01:35:35,679 across as um unclear what the level of services would be, 1201 01:35:33,840 --> 01:35:38,880 » right? Because I know that this project when we when the city purchased property 1202 01:35:37,520 --> 01:35:41,840 was not to be permanent supportive housing, which does have a higher level 1203 01:35:40,560 --> 01:35:45,520 of care, >> right? And I will say um I believe all 1204 01:35:43,840 --> 01:35:49,199 three proposals noted that that they were um targeting family housing. So 1205 01:35:47,840 --> 01:35:55,239 which is again a little bit different than um individual PSH. 1206 01:35:56,239 --> 01:36:02,400 And I think the second question was about height. I believe the default 1207 01:35:59,920 --> 01:36:08,239 maximum height for this zone is 36 feet if I'm not mistaken. But under um state 1208 01:36:05,360 --> 01:36:12,639 density bonus law um affordable housing projects are entitled to increase the 1209 01:36:10,719 --> 01:36:16,960 density on site and given its proximity to transit and the level of 1210 01:36:14,159 --> 01:36:20,320 affordability. Um if this were a private development for example, I don't believe 1211 01:36:18,800 --> 01:36:22,239 the city could impose any density restrictions 1212 01:36:21,040 --> 01:36:26,400 » or any height restrictions >> or a waiver. Yeah, they ask for height. 1213 01:36:23,920 --> 01:36:30,080 Height becomes a waiver concern, but that's kind of the difference nuance on 1214 01:36:28,320 --> 01:36:33,840 this one is we actually do get an opportunity to basically set kind of 1215 01:36:31,600 --> 01:36:37,440 like the scale and >> size of this project. So, 1216 01:36:35,520 --> 01:36:40,719 » okay. And then we also had I'm looking at my notes here. There were some 1217 01:36:38,960 --> 01:36:44,239 questions about going through the projects not selected. I actually don't 1218 01:36:42,480 --> 01:36:48,639 want to spend subcommittee time. I can't even parse through the three that we 1219 01:36:45,920 --> 01:36:52,480 have here. So, um but there was uh information if you could share. I don't 1220 01:36:50,639 --> 01:36:55,679 know how much of that is public information. So, if you could speak to 1221 01:36:53,760 --> 01:37:00,159 the to that didn't and I do realize there's a proprietary aspect to these. 1222 01:36:57,440 --> 01:37:04,719 These are all pitches. So, I I again, but if you could speak to that. So, we 1223 01:37:01,760 --> 01:37:11,119 already talked about um smart path that was addressed. Oh, the resident uh again 1224 01:37:08,639 --> 01:37:16,159 for the finalist that there was a chamber of commerce and staff, but why 1225 01:37:13,280 --> 01:37:20,239 there wasn't a community member? Never heard of I don't know if we've done 1226 01:37:17,520 --> 01:37:23,119 that. Maybe maybe some of the developers have experienced that in other cities. 1227 01:37:21,760 --> 01:37:26,560 As I said, this is a brave new world for us, but if you could speak to that and 1228 01:37:24,719 --> 01:37:30,639 then the other one, oh, the development score. So again, I know we're trying to 1229 01:37:28,480 --> 01:37:35,280 also be sensitive to the fact that that some of this information is confidential 1230 01:37:32,560 --> 01:37:39,199 to the Anyway, but if you could answer kind of those those questions and as 1231 01:37:37,440 --> 01:37:43,440 much as transparent as we can be. >> Yeah, sure. So this uh we received five 1232 01:37:41,280 --> 01:37:47,760 responses. is the two that didn't rise to the top. Um some lacked exper 1233 01:37:45,920 --> 01:37:52,639 experience that the these developer teams have and some of the proposals 1234 01:37:51,040 --> 01:37:57,760 were maybe underdeveloped or they didn't provide um any they didn't out identify 1235 01:37:55,840 --> 01:38:01,840 any community engagement or any three-bedroom units. Some of some of the 1236 01:37:59,840 --> 01:38:06,800 factors that led to higher scores for the other proposals. Um and then the the 1237 01:38:04,560 --> 01:38:12,320 panel consisted of of members that had different um levels and different 1238 01:38:09,520 --> 01:38:15,280 specialties with housing background. Um so even though we did have a member of 1239 01:38:13,679 --> 01:38:21,080 the Chamber of Commerce, they they had affordable housing experiences which is 1240 01:38:17,119 --> 01:38:21,080 what they brought to the panel. 1241 01:38:21,360 --> 01:38:25,280 » And then >> and then in respect to some of the 1242 01:38:23,360 --> 01:38:29,360 scoring or details and this is really typical for the city when we do an RFP 1243 01:38:27,199 --> 01:38:34,239 process. uh those will become public information or at least not proprietary 1244 01:38:31,199 --> 01:38:37,840 information once uh the council actually selects a developer to move forward that 1245 01:38:36,320 --> 01:38:42,880 point then we could release additional information because as we noticed some 1246 01:38:40,000 --> 01:38:45,760 of these competitive process RFPs maybe the first one doesn't work out we know 1247 01:38:44,400 --> 01:38:50,639 the second one so we're still at give that opportunity to uh select the 1248 01:38:48,320 --> 01:38:54,000 various groups um but that that's why the information is put out once we've 1249 01:38:52,320 --> 01:39:00,560 actually made that selection and enter into the NA and DDA so 1250 01:38:57,520 --> 01:39:06,000 Fantastic discussion or questions. >> I just want to follow up just to to 1251 01:39:02,880 --> 01:39:14,480 clarify that if this property if the site were being developed by a private 1252 01:39:07,840 --> 01:39:18,400 developer that had enough um concessions there would be no height limit. The 1253 01:39:17,199 --> 01:39:21,600 sky's the limit. >> No, it'd be a little different. We do 1254 01:39:19,760 --> 01:39:25,199 have density uh would be actually because there is a density standard uh 1255 01:39:23,280 --> 01:39:29,679 outside the downtown. So there would be a limitation based on the base allowance 1256 01:39:27,360 --> 01:39:33,360 density. Even when you put the the bonus stacking on there, there would be a 1257 01:39:31,360 --> 01:39:36,239 limitation as compared to some of our downtown zones. 1258 01:39:34,320 --> 01:39:40,719 » And do you have any idea what that would be? That would be a number of units. 1259 01:39:38,480 --> 01:39:43,360 » Um there would be, but I I really always feel when we start talking about things, 1260 01:39:42,080 --> 01:39:46,960 I think there's other factors that would limit really this kind of like maximum 1261 01:39:45,280 --> 01:39:50,639 sky's limit approach and really is some of the built infrastructure and also 1262 01:39:48,560 --> 01:39:55,440 what the site can actually handle. M >> um so uh in this case it's a sizable 1263 01:39:53,360 --> 01:39:59,199 parcel but uh some of these questions do come to play but there is actually a 1264 01:39:57,360 --> 01:40:02,320 height allowance a base density project you would actually have to call out what 1265 01:40:00,719 --> 01:40:07,679 the maximum density allowance is for this parcel I think we calculated in 1266 01:40:05,440 --> 01:40:12,159 like 140 range I can't recall off top of my head but um there is there would be a 1267 01:40:10,880 --> 01:40:16,639 box that actually would have to maintained if a um private developer had 1268 01:40:15,040 --> 01:40:20,639 acquired the site and move forward with development of this 1269 01:40:17,920 --> 01:40:20,639 » okay thank 1270 01:40:21,360 --> 01:40:28,800 Now we're to the discussion part. >> Trying to think how we can help um guide 1271 01:40:27,199 --> 01:40:32,960 the discussion. I I really want the entire council to be up here because 1272 01:40:30,400 --> 01:40:38,560 this is uh very much a challenge. So I'm trying to figure out how we can give 1273 01:40:34,080 --> 01:40:42,880 input that's helpful. Um it's well I'll start because I'm already starting. Um I 1274 01:40:40,800 --> 01:40:47,520 I'm just thank you to all three applicants that want to build and invest 1275 01:40:45,040 --> 01:40:52,320 in San Rafll. Um, I just want to start with that. And this is a new area for 1276 01:40:50,400 --> 01:40:57,520 the city of Sanfal for us to be owning this property. Um, and so as we find our 1277 01:40:55,920 --> 01:41:02,159 way through this process, whether you've been working in Sanfal or you're new to 1278 01:41:00,400 --> 01:41:05,679 uh, working in here, I think you can already tell that we care very deeply 1279 01:41:04,239 --> 01:41:08,880 about what's built here and what it looks like and how it responds both to 1280 01:41:07,520 --> 01:41:12,480 adjacent neighbors, but as well as to the entire community. I think that's a 1281 01:41:10,239 --> 01:41:18,880 good point. Um we've been doing this work between us many many decades and 1282 01:41:16,000 --> 01:41:22,639 the reality is um any change in use often is met with resistance for folks 1283 01:41:20,639 --> 01:41:28,560 that might be nearest and that's what it is and recognizing that impact is real. 1284 01:41:25,600 --> 01:41:33,440 So, how do you balance? Uh, both of those are true. Um, and this council has 1285 01:41:31,920 --> 01:41:37,040 been very very committed to having affordable housing. And the fact we're 1286 01:41:34,880 --> 01:41:41,520 even doing this, 80 units at the very minimum is a lot of units. And I and I 1287 01:41:39,600 --> 01:41:45,760 want to make sure that we don't in the pursuit of perfection lose sight of the 1288 01:41:44,320 --> 01:41:49,520 fact that no matter what, we're going to get 80 units because that is what our 1289 01:41:47,760 --> 01:41:55,199 agreement is. So, I want to just be clear that for me that was um that's a 1290 01:41:53,040 --> 01:41:59,840 very important uh number that I'm I want to say I'm fixated on but I'm thinking 1291 01:41:56,639 --> 01:42:04,239 about I we didn't talk about parking and part of this is my other questions I 1292 01:42:02,320 --> 01:42:07,280 know get worked out I want to say worked out but you have additional 1293 01:42:05,280 --> 01:42:13,520 conversations in the ENA what I heard over all three was a willingness to take 1294 01:42:11,360 --> 01:42:18,480 in that input and a willingness to have the project morph and as I said at the 1295 01:42:15,199 --> 01:42:23,199 very beginning and put um Eden on the spot it's very difficult to s to believe 1296 01:42:21,760 --> 01:42:27,360 like oh we're going to take input when you have really beautiful renderings 1297 01:42:24,880 --> 01:42:32,480 And again, it's hard for people unless you're very wellversed in looking at 1298 01:42:29,760 --> 01:42:37,119 architectural drawings to understand how those could be changed. And so, there's 1299 01:42:35,600 --> 01:42:40,080 always going to be a tension there. And that's just the reality. So, thank you 1300 01:42:38,480 --> 01:42:44,080 for being brave and putting pictures on the on in the document because I know 1301 01:42:42,960 --> 01:42:48,159 that soon as you put a picture out there, people are going to start to 1302 01:42:45,199 --> 01:42:52,639 respond to it uh either positively or negatively. Um, I'll just stop by saying 1303 01:42:50,960 --> 01:42:56,880 or close by saying I do think the stability of the residents is a is a 1304 01:42:54,400 --> 01:43:00,800 critical part. And I recognize the folks in this area. It's going to morph over 1305 01:42:58,800 --> 01:43:03,920 time. It's a 99-year lease. Hate to break it to you, none of us are going to 1306 01:43:02,320 --> 01:43:07,760 be here. We're at the end of this, right? And so, how do we have the 1307 01:43:05,600 --> 01:43:11,600 flexibility recognizing whether it's service workers or our teachers or 1308 01:43:09,360 --> 01:43:14,239 nurses are going to be there. So, I don't want to have it. It's not 1309 01:43:12,719 --> 01:43:16,880 permanent supportive housing. So, I don't want it to be built that way. 1310 01:43:15,360 --> 01:43:21,520 That's a whole other realm. That is not what we're talking about here. um even 1311 01:43:19,199 --> 01:43:25,119 though there are folks who have been formerly homeless who will be offered 1312 01:43:23,600 --> 01:43:29,360 spots, but that that's very different than 100% um permanent supportive 1313 01:43:27,280 --> 01:43:33,199 housing. The environmental aspect is incredibly important. Once it's built, 1314 01:43:30,960 --> 01:43:36,239 it's not going away. So, um paying attention to that and the designs, we 1315 01:43:34,960 --> 01:43:39,520 didn't get it in designs. We're not going to do that to you. Setbacks, 1316 01:43:37,920 --> 01:43:44,320 things like that. I do think the pedestrian experience as well as a 1317 01:43:41,920 --> 01:43:47,040 community experience is important. Um and a lot of that can be addressed 1318 01:43:45,760 --> 01:43:51,920 through setbacks and through good design. So that's why I didn't want us 1319 01:43:48,880 --> 01:43:55,199 to get hung up on design. And then I do think uh having the character of the 1320 01:43:53,920 --> 01:44:01,040 neighborhood respected it. It's an unusual site because it's very 1321 01:43:58,639 --> 01:44:05,679 industrial in some ways. You have an old Chevron, you have fast food, you have 1322 01:44:03,760 --> 01:44:10,080 multif family housing, you have public storage. There's kind of a lot going on 1323 01:44:07,920 --> 01:44:15,119 there. So having ultimately the design and whoever's chosen recognizing that 1324 01:44:12,480 --> 01:44:19,520 you're in this liinal space between you know the freeways on one side and how do 1325 01:44:17,920 --> 01:44:23,360 you recognize that there's an established neighborhood there that has 1326 01:44:21,040 --> 01:44:27,199 its own architectural language and yet this other buildings that are kind of 1327 01:44:25,760 --> 01:44:32,000 all over the board. I think that's really challenging actually um from a 1328 01:44:29,840 --> 01:44:36,400 design perspective and this is not just throw up a big box and call it a day at 1329 01:44:34,080 --> 01:44:40,400 all. So, um I'm actually really pleased that the city will have the ability to 1330 01:44:38,159 --> 01:44:44,560 influence that design because we've seen some other designs recently come across 1331 01:44:42,320 --> 01:44:48,239 that, um to me have not been as respectful from what we want in terms of 1332 01:44:46,239 --> 01:44:52,560 good design. So, I know that's not all helpful in terms of delineating. Um and 1333 01:44:50,400 --> 01:44:56,719 I'll just stop at one more thing. The whole financial stack of it all and that 1334 01:44:55,119 --> 01:45:01,440 is it was talked about how that's a changing landscape. Um I am fully 1335 01:44:59,520 --> 01:45:05,840 convinced that all three that presented tonight would figure it out. you have 1336 01:45:03,679 --> 01:45:08,480 all had records of doing this for decades and decades and decades and 1337 01:45:07,280 --> 01:45:12,560 you've been meaning you've been figuring it out year after year after year. So I 1338 01:45:10,639 --> 01:45:16,719 am completely confident um that was something that was really important to 1339 01:45:13,600 --> 01:45:21,600 me to hear and I heard that tonight. So um so I like I agree with you all three. 1340 01:45:20,167 --> 01:45:26,080 [laughter] Yeah, council member Busheen. 1341 01:45:24,480 --> 01:45:31,360 » I totally agree that would that would be the simplest um thing would be to um 1342 01:45:29,199 --> 01:45:37,360 take all three of you because that you all have um are incredibly qualified. 1343 01:45:34,320 --> 01:45:45,280 We're thrilled and honored that um you have um um made the effort to um and and 1344 01:45:41,840 --> 01:45:50,400 they have the desire to be in San Rafel. But we do need to make a decision um and 1345 01:45:47,920 --> 01:45:55,679 we can't have all three. Um, and I think what would most help be most helpful 1346 01:45:52,639 --> 01:45:59,840 because as a subcommittee our job is to give you staff direction for what will 1347 01:45:58,000 --> 01:46:06,480 be brought forward to the entire council. So with thinking along that 1348 01:46:02,719 --> 01:46:12,400 what can I give you for feedback? Um, my feedback is that I agree with your prior 1349 01:46:10,560 --> 01:46:16,880 or the way you're approaching it. the items that you've listed on page three 1350 01:46:14,560 --> 01:46:22,400 about in the middle of the page um where you say the strength of the proposal is 1351 01:46:18,880 --> 01:46:28,719 it would provide the most housing the the reason I think that should be the 1352 01:46:24,159 --> 01:46:34,400 first um criterion addressed the purpose of this is low-income 1353 01:46:31,119 --> 01:46:38,800 housing and one of the other groups the the people who wouldn't get to live here 1354 01:46:36,239 --> 01:46:43,840 are one group that aren't here but in addition 1355 01:46:40,400 --> 01:46:49,920 um the taxpayers of Marin County that have provided $8 million that allow us 1356 01:46:46,960 --> 01:46:56,639 to be in this happy position of having to choose which developer we want. Those 1357 01:46:53,600 --> 01:47:01,520 taxpayers I believe want the most value for their investment and that's why I 1358 01:46:59,440 --> 01:47:07,280 think we should be focused on the number of units in making sure that there are 1359 01:47:04,320 --> 01:47:13,520 familysiz units included in that mix. But the the numbers matter here. Um we 1360 01:47:10,000 --> 01:47:18,560 we need numbers. Um we need many many many units. So I think focusing on the 1361 01:47:16,320 --> 01:47:24,159 number of the units is the uh the the the correct first criterion. And and one 1362 01:47:22,320 --> 01:47:29,840 the next one you have is parking which is something we did haven't talked about 1363 01:47:26,080 --> 01:47:36,320 a lot about here although heaven help us have we heard about parking for those 1364 01:47:32,960 --> 01:47:45,360 many decades. So, I I would offer for the neighborhood consideration that park 1365 01:47:39,600 --> 01:47:54,159 off-site parking is a huge issue and the the um amount of onsite parking is 1366 01:47:49,920 --> 01:47:59,360 extremely important and the closely related to that is the ability 1367 01:47:57,360 --> 01:48:06,800 to get to transit so you don't have to have so many cars. Um those two things 1368 01:48:02,880 --> 01:48:13,440 work together to um uh keep the trans the transportation on 1369 01:48:10,480 --> 01:48:18,639 site that that can be and and provide the neighborhood benefit of paths to uh 1370 01:48:16,239 --> 01:48:23,280 for everyone to use to get to transit, not to mention the greater environmental 1371 01:48:20,719 --> 01:48:29,760 benefit. And then that that plays into the the neighborhood improvement. And 1372 01:48:26,560 --> 01:48:33,679 finally, I think too you um maybe should add a criterion that's been talked a lot 1373 01:48:31,760 --> 01:48:42,080 about today. The the next one would be the on-site services. Um because as I 1374 01:48:37,840 --> 01:48:45,440 was listening to many of the um specifics of the development, 1375 01:48:43,440 --> 01:48:48,800 particularly the environmental ones, maybe it's because I come from the 1376 01:48:46,639 --> 01:48:54,719 electricity industry. I hear all these things micro grids photobotic [laughter] 1377 01:48:52,159 --> 01:49:00,480 and it's like these are very complicated very dangerous things. These are not 1378 01:48:58,400 --> 01:49:07,360 something even your on-site manager you you need expertise 1379 01:49:02,639 --> 01:49:13,119 to maintain and to um be able to fully utilize the resistant the resilience 1380 01:49:10,159 --> 01:49:17,760 potential of these facilities. And if we're going to put these complex, 1381 01:49:16,159 --> 01:49:25,040 expensive, and dangerous um items on these sites, 1382 01:49:22,080 --> 01:49:33,280 we need to have um staff with expertise and training that are able to safely um 1383 01:49:29,119 --> 01:49:37,520 interact with these um features. So um those are the criteria. That's how I 1384 01:49:35,119 --> 01:49:41,920 would approach it um for for the rest of the council so that we have a way of um 1385 01:49:40,000 --> 01:49:45,199 looking at the information in a sequence. 1386 01:49:42,960 --> 01:49:48,560 » And would you we had talked about units but also bedrooms. I'm trying I'm trying 1387 01:49:47,119 --> 01:49:52,400 to figure out how we get at the mix piece and I know you said they all had 1388 01:49:50,800 --> 01:49:55,840 the mix. Are you or would your response to that be like that would be figured 1389 01:49:53,840 --> 01:50:00,400 out in the ENA? >> Again, just trying to get our hands 1390 01:49:57,199 --> 01:50:03,360 around. Yeah, I think you have to look at this is the concept plans that 1391 01:50:02,080 --> 01:50:06,639 they've kind of like for their own project. What what if okay everything's 1392 01:50:05,360 --> 01:50:08,880 held equal. This is what we would pursue. Okay. 1393 01:50:07,520 --> 01:50:12,719 » The hard part is really the due diligence. 1394 01:50:10,080 --> 01:50:15,600 » What what capacity or what sewer allocation? There's a lot of questions 1395 01:50:14,400 --> 01:50:19,119 that come into play >> about getting there. So that's why it's 1396 01:50:16,960 --> 01:50:23,199 hard to get unit mix, but I think we just that's why we really are focused on 1397 01:50:20,880 --> 01:50:28,639 the developer and then recognizing all three developers could deliver what the 1398 01:50:25,440 --> 01:50:33,760 city is looking to deliver. Okay. >> But we don't want 1399 01:50:31,199 --> 01:50:38,560 all, you know, a whole bunch of of um studios, you know, exclusive studios. We 1400 01:50:36,080 --> 01:50:41,760 do want some family units. >> Agree. 1401 01:50:39,040 --> 01:50:45,600 » At at some fraction. >> Agreed. And then that's really made me 1402 01:50:43,760 --> 01:50:49,920 look at the percentages proposed to say whatever the actual build approach was 1403 01:50:47,440 --> 01:50:53,280 the same percentages of the intermix of units and then all three of them 1404 01:50:51,600 --> 01:50:57,119 actually gave a mix of units. So that's why I said that's the benefit bit versus 1405 01:50:55,600 --> 01:51:01,920 just one single type. And we've seen that uh in actual market rate projects 1406 01:50:59,600 --> 01:51:07,199 um coming in that were just one type of unit typology. 1407 01:51:04,719 --> 01:51:11,119 » Any city manager? Anyone else want I'm trying to figure out how we um don't 1408 01:51:09,440 --> 01:51:14,159 just have we can have a repeat of this meeting, but I'm I'm trying to figure 1409 01:51:12,400 --> 01:51:19,679 out what the next steps would be. I know in terms of these timelines, they're 1410 01:51:17,520 --> 01:51:23,679 very I mean the starting one was August 2026 and we're not selecting a partner 1411 01:51:21,920 --> 01:51:31,360 tonight and as far as I know August ends in a week and a half. So I I'm just tell 1412 01:51:28,560 --> 01:51:36,560 all of us from what you've heard how you want what's going to happen next. Is 1413 01:51:33,600 --> 01:51:40,639 staff going to make an a proposal of two of the finalists maybe? I mean that 1414 01:51:38,639 --> 01:51:45,599 would be to me as opposed to having three having maybe two I don't know but 1415 01:51:43,920 --> 01:51:49,280 I don't know. >> You know I believe based on the input 1416 01:51:47,679 --> 01:51:53,760 provided from the subcommittee that staff's prepared to actually bring 1417 01:51:50,639 --> 01:52:01,040 forward um a recommendation to council. Um I think um as I said we we do have a 1418 01:51:58,719 --> 01:52:05,199 luxury of three qualified firms. Okay. >> Um but I do believe we have um staff is 1419 01:52:03,840 --> 01:52:08,239 comfortable making a recommendation for council. So 1420 01:52:06,080 --> 01:52:10,320 » Okay. And then being prepared to answer or talk to the other ones. I'm sure. 1421 01:52:09,760 --> 01:52:14,639 Okay. >> Yes. 1422 01:52:11,840 --> 01:52:18,080 » City manager. Anything else? Being that this is a brave new world for all of us 1423 01:52:16,400 --> 01:52:22,080 in this room. Well, maybe not for the applicants. They've been they've done 1424 01:52:19,440 --> 01:52:27,599 this before, but for us on this side for a long time, right? 1425 01:52:24,080 --> 01:52:33,199 » No, I think uh staff's gotten some good feedback both in presentations 1426 01:52:30,320 --> 01:52:37,760 and from the uh subcommittee. um we'll work on uh most likely bringing forward 1427 01:52:35,920 --> 01:52:42,400 a recommendation to the full council which ultimately uh will make the 1428 01:52:39,840 --> 01:52:48,480 decision and as we typically do with all of our staff recommendations will likely 1429 01:52:45,040 --> 01:52:51,920 be our recommendation and maybe uh option or alternative should the council 1430 01:52:50,480 --> 01:52:57,599 discussion >> um warrant um going in that direction 1431 01:52:55,280 --> 01:53:01,040 » and will that be September October again I'm just trying to not to put you can 1432 01:52:59,599 --> 01:53:04,000 say by the month you don't have to say the exact meeting day because I know 1433 01:53:02,960 --> 01:53:07,920 there's a lot going on. >> We would be targeting uh September, 1434 01:53:06,000 --> 01:53:11,760 October for bringing that forward >> and so folks can know when it's coming 1435 01:53:09,760 --> 01:53:16,320 forward by subscribing to snapshot because again we we want to give people 1436 01:53:14,400 --> 01:53:19,199 as much when we know that it's coming forward. We want people to be able to 1437 01:53:17,599 --> 01:53:25,679 know how would they know when it's coming forward. 1438 01:53:20,719 --> 01:53:30,880 Um well, we'll communicate it on our um project web page and uh we can talk 1439 01:53:27,840 --> 01:53:34,159 about um maybe teasing out a long range calendar as part of our agenda process 1440 01:53:32,719 --> 01:53:35,199 so people can see what items are coming up. 1441 01:53:34,320 --> 01:53:38,719 » I think that would be great. >> Yeah. 1442 01:53:36,000 --> 01:53:42,080 » Okay. Well, with that um again, thank you all for being here. We appreciate 1443 01:53:40,560 --> 01:53:45,440 everything from both the applicants as well as the public that came and 1444 01:53:43,440 --> 01:53:49,239 provided their input. Uh this meeting is adjourned. Good night.