1 00:00:00,460 --> 00:00:07,720 Good morning, everybody. I'm very sure Richard Santos and welcome to the Santa Cruz Valley Water Jiffy Board of Directors meeting. 2 00:00:08,440 --> 00:00:15,200 The chair Mr. Mayor will be meeting this in close session. I don't know, director Jim Bellv had a call in he has some medical appointments. 3 00:00:15,920 --> 00:00:18,700 And madam, with that we'll call the meeting to order. 4 00:00:18,900 --> 00:00:22,120 Thank you, Director Ballard. Director Eisenberg. 5 00:00:22,800 --> 00:00:30,240 Director Shua, Vice Chair Santos, Director of Aurella, Chair Estimera, you have a 6 00:00:30,240 --> 00:00:30,560 quorum. 7 00:00:30,780 --> 00:00:31,300 Thank you. 8 00:00:31,360 --> 00:00:33,320 And we wish a happy birthday to John Burella 9 00:00:35,980 --> 00:00:38,540 and it was four hours later I was born. 10 00:00:39,300 --> 00:00:41,900 So that's, that's right. 11 00:00:42,100 --> 00:00:42,720 You got it. 12 00:00:42,840 --> 00:00:44,460 So again, I'm glad everybody is here. 13 00:00:45,060 --> 00:00:46,400 We have plenty of work to do today. 14 00:00:46,900 --> 00:00:50,100 We're going to be going to close session to have labor and negotiations. 15 00:00:52,040 --> 00:00:53,340 Legal counsel in the comments. 16 00:00:53,940 --> 00:00:56,960 So with that, we'll see you all at one o'clock. Thank you. 17 00:03:15,220 --> 00:03:17,980 Good afternoon, we'll call our meeting back to the order. 18 00:03:18,700 --> 00:03:20,420 And let's see, we'll have a. 19 00:03:24,380 --> 00:03:26,460 Thank you, Mr. Chair. I'll sort of get on to your council. 20 00:03:27,520 --> 00:03:30,600 I would just expect to item 2.1, the board met in close session with all directors, 21 00:03:30,820 --> 00:03:33,760 except director Bell participating and no reportable action was taken. 22 00:03:35,420 --> 00:03:36,220 Thank you. 23 00:03:37,200 --> 00:03:39,660 We'll move on to. 24 00:03:39,760 --> 00:03:41,560 3.1, pledge of allegiance. 25 00:03:41,560 --> 00:03:44,940 That's the way the ballad to lead us. 26 00:03:49,320 --> 00:03:53,540 I pledge allegiance to the flag of the United States of America. 27 00:03:54,180 --> 00:03:55,260 And to the power of it. 28 00:03:55,340 --> 00:03:58,620 From which it stands for nation and by the God. 29 00:03:59,180 --> 00:04:02,640 Indivisible liberty and justice for all. 30 00:04:02,960 --> 00:04:03,960 Thank you. 31 00:04:10,010 --> 00:04:10,770 What is it today? 32 00:04:10,930 --> 00:04:12,270 I don't have any requests. 33 00:04:13,030 --> 00:04:14,670 At this point, so we won't make any adjustments. 34 00:04:15,670 --> 00:04:17,470 We'll move right along at 3.3. 35 00:04:17,470 --> 00:04:22,110 time open for public comment on any issue that's not on our agenda. 36 00:04:22,490 --> 00:04:28,350 Not as a time for any members of the public that might want to address us on any issues that are not on our agenda. 37 00:04:28,910 --> 00:04:30,270 Do we have any requests, Mancler? 38 00:04:30,590 --> 00:04:33,890 Thank you, Chair. We have no request to speak online or in person. 39 00:04:35,490 --> 00:04:40,090 Yeah, and we'll move right along to 3.4, 40 00:04:42,640 --> 00:04:45,240 conduct a public hearing to consider adopting a resolution 41 00:04:45,240 --> 00:04:50,900 of necessity relating to the opposition of real property interest from the city of San Jose and 42 00:04:50,900 --> 00:04:58,340 necessary to complete the Coyote Creek Protection Project with a pretty large number of projects. 43 00:05:00,000 --> 00:05:08,560 afternoon. As chair, I'd like to welcome everyone attending this meeting, the public hearing to consider 44 00:05:08,560 --> 00:05:13,560 adoption of a resolution of necessity relating to acquisition of real property interests from the city of 45 00:05:13,560 --> 00:05:21,560 San Jose to complete the code, quick blood protection project is not open. The hearing will be conducted as followed. 46 00:05:22,120 --> 00:05:26,420 First, the board will hear from valiant water staff providing facts that will support the findings said 47 00:05:26,420 --> 00:05:28,120 in the resolution of necessity. 48 00:05:28,820 --> 00:05:31,200 Information provided by staff will be incorporated into, 49 00:05:31,760 --> 00:05:34,880 will be a part-up and informed by deliberations for this hearing. 50 00:05:35,620 --> 00:05:40,160 After the presentation, the property owner will have an opportunity to address the board, 51 00:05:40,460 --> 00:05:43,460 regarding the findings that are set forth in the resolution in necessity, 52 00:05:44,100 --> 00:05:46,440 then the board will commence the hearing. 53 00:05:47,380 --> 00:05:50,020 The hearing is the time for public comment. 54 00:05:50,260 --> 00:05:53,820 I will call a speaker in the order that the speaker request will receive. 55 00:05:53,820 --> 00:05:57,680 Each speaker shall have three minutes to address the board regarding the matter. 56 00:05:58,200 --> 00:06:02,380 At the public comments are received in the property owner, has been afforded an opportunity 57 00:06:02,380 --> 00:06:06,580 to address any outstanding points made during the public comment period. 58 00:06:06,800 --> 00:06:09,340 The board would then close the public hearing. 59 00:06:10,180 --> 00:06:13,900 The board may discuss the finding, supporting the adoption of the resolution and necessity, 60 00:06:14,540 --> 00:06:18,260 and made that request, the highly water staff, and the property owner. 61 00:06:18,700 --> 00:06:22,600 Finally, the board will make a decision on whether or not to adopt the resolution 62 00:06:22,600 --> 00:06:28,340 in necessity, approval of this resolution requires a two-thirds vote, five hundred and seven 63 00:06:28,340 --> 00:06:34,160 of us. Anyone wishing to address the board may do so by filling out a speaker card 64 00:06:34,160 --> 00:06:39,220 is submitting it to the clerk or use the raise hand function in the Zoom meeting application 65 00:06:39,220 --> 00:06:45,100 to identify yourself in order to speak. Speakers will be allowed at three minutes and due to the 66 00:06:45,100 --> 00:06:49,220 number of people attending, tonight's meeting only once speaker card per person will be accepted. 67 00:06:49,220 --> 00:06:54,620 speak, speak cards of value from the clerk. 68 00:06:55,480 --> 00:06:58,380 Value water will now open and conduct the hearing for agenda 3.4. 69 00:06:59,080 --> 00:07:01,560 The proposed acquisition by eminent domain of properties, 70 00:07:02,180 --> 00:07:04,460 located at the various locations in San Jose, 71 00:07:04,880 --> 00:07:07,340 including Watson Park, Maverick Service Yard, 72 00:07:07,640 --> 00:07:10,280 William Street Park, Selma Alinda Park, 73 00:07:10,560 --> 00:07:13,840 Coyote Creek Park Chain and Kelly Park owned by the city of San Jose. 74 00:07:13,840 --> 00:07:24,100 I invite Madhu to Maluru to the Deputy Operating Officer Watershed Design Construction to commence presentation for the City of San Jose properties. 75 00:07:25,900 --> 00:07:29,620 Thank you chair. I just wanted to introduce Madhu as you commented. 76 00:07:30,240 --> 00:07:35,480 So I'm going to turn it over to him. You're entering your manager for our watershed design construction. Thank you. 77 00:07:35,720 --> 00:07:35,990 Thank you. 78 00:07:38,400 --> 00:07:39,640 All right. Thanks, Bowenie. 79 00:07:39,900 --> 00:07:40,520 Good afternoon chair. 80 00:07:40,520 --> 00:07:42,020 Mr. Mera and members of the board, 81 00:07:42,180 --> 00:07:43,160 my name is Madhu Tamiluru, 82 00:07:43,220 --> 00:07:44,480 capital engineering manager 83 00:07:44,480 --> 00:07:46,940 in the Watershift's Design and Construction Division. 84 00:07:48,060 --> 00:07:49,140 So, in the following slides, 85 00:07:49,320 --> 00:07:51,580 I'll provide information to support the findings 86 00:07:51,580 --> 00:07:53,700 set forth in the resolution of necessity 87 00:07:54,140 --> 00:07:56,380 for the subject properties within the Cytclic 88 00:07:56,380 --> 00:07:57,780 Fred production project footprint. 89 00:08:12,340 --> 00:08:14,260 The findings to be made at this public hearing 90 00:08:14,260 --> 00:08:17,500 are first to establish the public need for the project, 91 00:08:17,940 --> 00:08:20,220 then to establish that the project is designed 92 00:08:20,220 --> 00:08:22,360 in a manner that is most compatible 93 00:08:22,360 --> 00:08:28,580 with the greatest public good and least private engineering. Then we need to determine the 94 00:08:28,580 --> 00:08:33,720 properties necessary for the project and lastly to establish the offer made to the property 95 00:08:33,720 --> 00:08:40,160 owners is in accordance with the section 7267.2 of the government code. 96 00:08:44,760 --> 00:08:46,680 The first finding is to 97 00:08:46,680 --> 00:08:51,920 establish the public necessity for this project. The project is needed to protect the properties 98 00:08:51,920 --> 00:08:55,480 along the KIT Creek from Montague Expressway to Tally Road, 99 00:08:55,860 --> 00:08:58,740 against the flood levels that occurred in February of 2017, 100 00:08:59,360 --> 00:09:02,880 and that flood is approximately equal to like a 20-year flood event. 101 00:09:03,740 --> 00:09:08,700 The other benefits of this project include preserving the creek habitat and reduction in the 102 00:09:08,700 --> 00:09:10,400 long-term maintenance of the creek. 103 00:09:13,290 --> 00:09:16,490 On this map, you can see the extent of the KIT Creek 104 00:09:16,490 --> 00:09:21,670 flood protection project. The project was divided into two phases in response to the federal 105 00:09:21,670 --> 00:09:28,090 energy regulatory commission order are also referred as a forecorder in February of 2020. 106 00:09:29,090 --> 00:09:34,430 The phase one part of this project is referred to as a high degree flight management measures 107 00:09:34,430 --> 00:09:41,450 project and the construction of it is complete and the board accepted the work on June 24 of this year. 108 00:09:42,730 --> 00:09:48,890 And the phase two project is referred to as a high degree flight protection project and the 109 00:09:48,890 --> 00:09:54,510 Construction is expected to begin in the early 2026 and the combined fluid production project 110 00:09:54,510 --> 00:09:59,890 extends from Montague expressway in the north to the Thali road in the south. 111 00:10:00,000 --> 00:10:10,140 And it consists of like five different reaches. So, and this particular public hearing is in regards to the properties located in reaches six, seven and eight. 112 00:10:15,280 --> 00:10:26,220 The project design is constrained by the geography of the creek. The vast majority of the creek flows through the private property and some park lines like public parks. 113 00:10:29,580 --> 00:10:39,760 This leads us to our next finding that the proposed project is planned, located and designed in a manner that will be most compatible with the greatest public good and least private engineering. 114 00:10:40,640 --> 00:10:48,840 This was achieved through a holistic approach using the 115 00:10:48,840 --> 00:10:54,180 while preserving the existing habitat as well as avoiding the private structures and 116 00:10:54,180 --> 00:10:56,340 loss of usable space in the public parks. 117 00:11:00,380 --> 00:11:01,920 As far as like sequer compliance, 118 00:11:02,220 --> 00:11:07,280 value water as a lead agency, prepared the environmental impact report and the project 119 00:11:07,280 --> 00:11:11,940 on the EIR was satisfied by the board on March 11th of this year. 120 00:11:17,200 --> 00:11:22,220 And the project this project requires like 62 property acquisitions in reaches 4 through 121 00:11:22,220 --> 00:11:29,360 8 and the subject resolution of necessity is being proposed for 13 out of those 62 parcels and 122 00:11:29,360 --> 00:11:34,920 all these 13 parcels are owned by City of San Jose and they are in reaches 6, 7 and 8. 123 00:11:39,550 --> 00:11:47,150 As I said, like the 13 properties are necessary total out of 62 13 properties are being considered under 124 00:11:47,150 --> 00:11:52,950 this resolution of necessity. The flat protection elements will be constructed on these 13 properties 125 00:11:52,950 --> 00:12:03,690 And a portion of the properties will be needed to be permanently available to be able to maintain the flat protection elements after construction, so which is referred as a permanent easement. 126 00:12:04,350 --> 00:12:16,350 And the construction activities also require that a separate portion of the properties be temporarily accessible to construct the flat protection elements and access the construction areas referred to as a temporally construction easement. 127 00:12:17,980 --> 00:12:22,800 This map shows like where the subject properties are located in the project reaches. 128 00:12:23,880 --> 00:12:28,660 The red outline highlights the general area, where the properties are located. 129 00:12:29,220 --> 00:12:34,300 Properties being included in this resolution of necessity are in the Mayberry service yard, 130 00:12:34,760 --> 00:12:40,900 Watson Park, William Street Park, Selma Wolinder Park, Cytically Park Chain and Kelly Park. 131 00:12:42,300 --> 00:12:46,760 In the next few slides we'll look at each property each parcel in more detail 132 00:12:46,760 --> 00:12:50,840 and talk about the land rights needed in each of those parcels. 133 00:12:52,740 --> 00:12:57,380 This slide shows details of the proposed easements at the Mavari service yard 134 00:12:57,380 --> 00:13:02,520 to orient yourself like not this point into our top left corner of the page, Mavari Road 135 00:13:02,520 --> 00:13:09,040 is shown on the upper left of this map and highway 101 is shown on the bottom right of this map. 136 00:13:09,540 --> 00:13:15,960 So the proposed flood walls are shown in green line and the berms in orange line and in the 137 00:13:15,960 --> 00:13:20,820 your slides. You'll show the passive barriers, which are shown in the magenta color and all 138 00:13:20,820 --> 00:13:26,740 these colors are consistent in the next eight slides. And the temporary construction easement 139 00:13:26,740 --> 00:13:32,580 is shown in purple and the permanent easement are shown in red color in the next eight slides. 140 00:13:34,660 --> 00:13:45,940 And this slide shows more details of the permanent easement proposed easements at the 141 00:13:45,940 --> 00:13:49,800 and Highway 101 is on the top left corner of the map. 142 00:13:53,690 --> 00:13:58,330 This slide shows the details of the remaining easements needed within the Watson Park area. 143 00:13:59,230 --> 00:14:04,210 So, not this pointing up on this page, Jackson Street is shown on the top left of the map, 144 00:14:04,470 --> 00:14:07,970 and the not 22nd Street is just south of the larger park area. 145 00:14:11,940 --> 00:14:15,680 This slide shows the details of the proposed easements at William Street Park, 146 00:14:16,240 --> 00:14:19,180 and the South 16th Street is shown on the bottom of this map, 147 00:14:19,180 --> 00:14:22,440 and the East William Street is on the left-hand side of this figure. 148 00:14:23,560 --> 00:14:28,960 So, the proposed flat walls and the proposed flat wall at the William Street Park is shown as a green line, as I mentioned earlier, 149 00:14:29,600 --> 00:14:36,860 and the park will have like a lot of passive barriers installed along the western and northwestern side of this park. 150 00:14:37,560 --> 00:14:42,940 So, these passive barriers will provide continual access to the park for the public after the project is completed. 151 00:14:42,940 --> 00:14:44,000 So, 152 00:14:48,970 --> 00:14:54,830 this slide shows the proposed improvements, proposed easements along the Nartend of the Salma 153 00:14:54,830 --> 00:14:59,250 World Interpark, which is on the other side of the creek from the VLN Street Park. 154 00:14:59,690 --> 00:14:59,970 So... 155 00:15:00,000 --> 00:15:04,320 The flood walls and passive areas are proposed as flood protection elements here. 156 00:15:08,270 --> 00:15:13,410 This light shows the remaining parts of the Salmawal Interpark owned by the city of San Jose. 157 00:15:13,730 --> 00:15:19,810 Woodborough drive is on the top of this page and the CITICRIC is at the bottom of this page. 158 00:15:26,620 --> 00:15:28,660 And here. 159 00:15:29,680 --> 00:15:34,960 This slide shows more details of the proposed easements on the Category Part Chain. 160 00:15:35,140 --> 00:15:37,640 Story Road is shown at the bottom of this map. 161 00:15:38,040 --> 00:15:42,880 The proposed flat wall is shown in the green color, along with the necessary easements in this area. 162 00:15:45,640 --> 00:15:49,980 Finally, this slide shows the detailed map of the proposed easements at the Kelly part. 163 00:15:50,520 --> 00:15:55,440 Not this pointing up on this map, but in group drive is shown along the bottom of this map. 164 00:15:56,120 --> 00:15:58,920 And the green line represents the flat wall as I mentioned earlier. 165 00:15:58,920 --> 00:15:59,640 And 166 00:16:03,220 --> 00:16:08,360 a little bit more information on the CDF San Jose properties needed for this project. 167 00:16:09,160 --> 00:16:15,500 So we are valuable to be planning to construct like passive barriers, flood walls and berms. 168 00:16:15,680 --> 00:16:17,700 And all of these are in the city park line. 169 00:16:18,680 --> 00:16:21,580 And the project will maintain the existing access to the park. 170 00:16:21,920 --> 00:16:26,040 And will minimize the impacts to the existing and planned recreational facilities. 171 00:16:27,540 --> 00:16:32,020 After the project is constructed, the areas will be returned to each existing use. 172 00:16:33,690 --> 00:16:44,550 And the last finding to make this hearing is that an offer required by the government court section 7267.2A was made to the owner of the record. 173 00:16:44,750 --> 00:16:50,470 government court offer was made to the property owner on record on July 16th of this year. 174 00:16:50,970 --> 00:16:54,370 And it was not as an it was at a framework at value. 175 00:16:54,370 --> 00:16:57,950 City of San Jose has confirmed that they have received this package 176 00:17:00,280 --> 00:17:08,480 and this concludes the staff's presentation and after the board receives the comments from the property owner or public 177 00:17:08,480 --> 00:17:20,500 We'll be we'll stand by to answer any questions. Thank you, Madhu. We have any requests to address this. We do not have any requests to speak. Okay. Any discussion questions? 178 00:17:22,560 --> 00:17:29,440 Yes. Yes. Yeah, Mr. Chair, one question question. When we acquire all this and get this thing going, 179 00:17:29,840 --> 00:17:34,080 does the city of Sase provided maintenance on their property or they required? 180 00:17:34,780 --> 00:17:38,320 Yeah, there is an increment like whatever we are acquiring as a permanent easement. 181 00:17:38,540 --> 00:17:42,480 We will be maintaining that part because our flood protection features will be there. 182 00:17:42,700 --> 00:17:46,400 And the remaining areas will be maintained by the city of Sase. 183 00:17:47,780 --> 00:17:48,480 Thank you. 184 00:17:49,460 --> 00:17:50,140 Any other questions? 185 00:17:50,140 --> 00:17:53,520 a 10 motion. Second, 186 00:17:56,300 --> 00:18:02,740 sorry, let's close the public hearing. Other than a 10 motion, the 187 00:18:02,740 --> 00:18:10,510 closed public hearing. Those full motions say aye. Aye. Opposite no. Okay, we'll bring back 188 00:18:10,510 --> 00:18:12,190 the motion for approval of the resolution. 189 00:18:16,710 --> 00:18:20,810 Director Ballard. Director Bell. Absent. Director 190 00:18:20,810 --> 00:18:29,610 Vice President, Director Shua, Vice Chair Santas, Director of Aurella, Chair Esther Merad, motion passes. 191 00:18:30,270 --> 00:18:33,730 Thank you. 192 00:18:33,910 --> 00:18:33,950 Thank you. 193 00:18:33,950 --> 00:18:38,550 Move right along to our consent calendar for 0.12. 194 00:18:39,590 --> 00:18:40,750 There's a motion in the second. 195 00:18:42,090 --> 00:18:43,390 Those of motion say aye. 196 00:18:44,170 --> 00:18:53,310 who say no? Move right along to 5.1. Receive the semi-annual lobbyist report. 197 00:18:53,990 --> 00:18:55,750 That's for information only. Any questions? 198 00:19:02,650 --> 00:19:06,330 Well, there is no presentation. It's just the list 199 00:19:06,330 --> 00:19:13,650 of the lobbyists. I mean, and the lobbyists are here, so I've already, you know, in our report. 200 00:19:14,650 --> 00:19:23,650 Next is a 5.2 board committee reports. We have handouts. Any questions on any of these? 201 00:19:24,630 --> 00:19:25,390 Okay. 202 00:19:28,000 --> 00:19:36,230 Okay, then move right along to 8.1. We should even update on the Pacheco Reservoir Expansion Project. 203 00:19:36,370 --> 00:19:43,600 Project number 9195402 and Brian. 204 00:19:45,080 --> 00:19:50,600 Yes. We have right a panel. I'm good. I'm going to give a chance for staff to come out here. 205 00:19:51,740 --> 00:19:55,680 But good afternoon, members of the board, Charis Dernera and members of the public. 206 00:19:56,000 --> 00:19:56,400 Thanks. 207 00:19:56,760 --> 00:19:59,980 I'm Melanie Richardson, the interim CEO, and I'm going to kick. 208 00:20:00,000 --> 00:20:25,500 Off today's staff presentation for the Pecheco Reservoir Expansion Project. Currently valley water is facing unprecedented financial pressure and economic uncertainty. Like many public agencies, we have been and continue to navigate years of high inflation, rapidly rising construction costs, and ongoing economic uncertainty at the federal state and local levels. 209 00:20:25,500 --> 00:20:31,780 Therefore, we need to continue to find ways to reduce the burden on our ratepayers and 210 00:20:31,780 --> 00:20:33,920 keep water affordable for the community. 211 00:20:34,520 --> 00:20:40,560 This means prioritizing only the most critical projects that secure and advance our 212 00:20:40,560 --> 00:20:45,620 core missions and deferring or delaying projects that are not via the left-list time. 213 00:20:46,420 --> 00:20:52,960 After the board approved the FY26 budget, the CIP and the groundwater charges this past spring, 214 00:20:52,960 --> 00:21:00,600 staff began taking a deeper look at key budgeted projects to determine if they are the best 215 00:21:00,600 --> 00:21:05,640 option for value water given the financial constraints were currently under and this analysis 216 00:21:05,640 --> 00:21:09,020 included the Pachagal project. Next slide please. 217 00:21:28,270 --> 00:21:32,310 Thank you. In May, staff presented before 218 00:21:32,310 --> 00:21:38,350 the California Water Commission, a status update of the Pachagal project and the commission 219 00:21:38,350 --> 00:21:45,190 had many of the same concerns that staff was already considering. Namely, the time lines that 220 00:21:45,190 --> 00:21:51,750 it was taking to complete environmental review and design, the project affordability, securing 221 00:21:51,750 --> 00:21:57,250 approvals that are required from the Bureau of Reclamation, and what those might mean to the 222 00:21:57,250 --> 00:22:02,590 overall benefits of the project, and then just the priority of the Pichigo Reservoir project 223 00:22:02,590 --> 00:22:04,870 in our overall water supply master plan. 224 00:22:06,350 --> 00:22:10,150 So today, staff has collected most of the information 225 00:22:10,150 --> 00:22:13,790 that we feel we need to present to allow you 226 00:22:13,790 --> 00:22:16,030 to make an informed decision about this project. 227 00:22:16,550 --> 00:22:18,970 And we're going to give you a pretty comprehensive update 228 00:22:18,970 --> 00:22:19,410 today. 229 00:22:19,630 --> 00:22:22,070 It's going to be distributed among several staff. 230 00:22:22,370 --> 00:22:24,150 We're going to start with Rita Chan, 231 00:22:24,510 --> 00:22:27,110 who's going to give us an overview of the environmental review 232 00:22:27,110 --> 00:22:30,350 timeline, followed by Ryan McCurder and staff. 233 00:22:30,350 --> 00:22:32,330 we're going to talk about the design status. 234 00:22:33,390 --> 00:22:36,330 And then Darren Taylor is going to talk about affordability 235 00:22:36,330 --> 00:22:40,350 of the project, including a recent cost estimate update 236 00:22:40,350 --> 00:22:43,330 that staff is completed just late last week. 237 00:22:43,470 --> 00:22:46,090 So two light to get into the packet that Darren will talk 238 00:22:46,090 --> 00:22:49,730 about that cost estimate and what that means to rate impacts. 239 00:22:50,590 --> 00:22:53,870 And then lastly, Aaron Baker will talk about two subjects. 240 00:22:54,070 --> 00:22:55,410 He'll first talk about the meeting 241 00:22:55,410 --> 00:22:58,910 that executive staff had with the interim regional director 242 00:22:58,910 --> 00:23:04,410 of the Bureau of Reclamation in early July where we talked about securing key approvals for the 243 00:23:04,410 --> 00:23:08,770 Bureau and what those meant to be overall benefits of the project. 244 00:23:09,750 --> 00:23:15,790 And then Aaron will finalize this by talking about the water supply master plan, what 245 00:23:15,790 --> 00:23:21,830 differing or suspending to take on might mean to the master plan and what we could do is 246 00:23:21,830 --> 00:23:26,990 alternative projects to make up for a replace that benefit. 247 00:23:26,990 --> 00:23:30,370 So with that, I'm going to turn it over to Rita Cham. 248 00:23:31,170 --> 00:23:31,690 Thank you, sir. 249 00:23:32,450 --> 00:23:33,670 Chair, I see Mariah. 250 00:23:33,850 --> 00:23:34,790 Members of board. 251 00:23:34,890 --> 00:23:36,370 I'm going to talk about briefly. 252 00:23:37,630 --> 00:23:40,210 Where we are in environmental review and permitting process. 253 00:23:40,530 --> 00:23:41,850 It's like, see. 254 00:23:42,590 --> 00:23:47,270 So as you know, the draft environmental impact report was released back in November 2021. 255 00:23:47,470 --> 00:23:50,230 In compliance with the proposition one deadline, 256 00:23:51,630 --> 00:23:53,150 which was codified in the water code. 257 00:23:53,810 --> 00:23:56,730 Since then, the project has undergone significant design changes. 258 00:23:57,370 --> 00:24:02,790 And along the way, staff has identified some areas that we could be finding some of the 259 00:24:02,790 --> 00:24:03,210 analysis. 260 00:24:04,370 --> 00:24:08,330 And pursuant to the seafood guidelines, our staff has determined that the circulation 261 00:24:08,330 --> 00:24:10,810 of the revised draft year will be necessary. 262 00:24:11,450 --> 00:24:16,630 So staff has been working very diligently, making progress on the preparation of this 263 00:24:16,630 --> 00:24:17,210 revised year. 264 00:24:17,830 --> 00:24:24,190 The revised draft year is scheduled for release in December, 2026, and staff anticipates 265 00:24:24,190 --> 00:24:29,130 spring in the final year or to the board for certification in December 2027. Next slide, please. 266 00:24:32,200 --> 00:24:38,100 In terms of permitting, as you know, due to the extended schedule, we are still in the process 267 00:24:38,100 --> 00:24:44,780 of preparing permit applications. This is not unusual because most of the all-the-state agencies 268 00:24:44,780 --> 00:24:51,620 will have to rely on our secret document to make approval of the project. And because of what I just mentioned 269 00:24:51,620 --> 00:24:57,800 earlier that the need for us to revise the ER before we finalized it. Naturally, we have 270 00:24:57,800 --> 00:24:59,980 not submit any permit after- 271 00:25:00,000 --> 00:25:08,640 That set, staff has been working to us, making the future permit review in approval process as streamlined as possible. 272 00:25:09,420 --> 00:25:16,280 And we are accomplishing that by holding a lot of individual and group meetings with the applicable regulatory agencies. 273 00:25:17,020 --> 00:25:26,620 And the idea is that once we are ready to submit the permit application, these early engagements, going to lay the groundwork for more streamlined permit approvals. 274 00:25:26,620 --> 00:25:36,080 Once we finalize, so yeah, or with that, I think I'm going to turn it over to Ryan Carter, Deputy Operating Officer. 275 00:25:36,740 --> 00:25:38,700 Thanks Rita, good afternoon, board. 276 00:25:39,280 --> 00:25:42,740 I'm Ryan McCarter, Deputy Operating Officer, Dam Safety and Capital Delivery Division. 277 00:25:43,300 --> 00:25:48,060 So I'm going to talk a little bit about the design completion timeline for the Pacheco Reservoir Expansion Project. 278 00:25:48,500 --> 00:25:54,700 But first, I want to just take a step back and just explain what a 30% design means compared to a 60% design. 279 00:25:54,700 --> 00:25:57,980 It's really the level of detail that we have for that design. 280 00:25:58,140 --> 00:26:01,520 It's not like it's a partial design and we have 70% of a blank page. 281 00:26:02,000 --> 00:26:05,560 So a 30% design means we have a design for the entire project. 282 00:26:05,960 --> 00:26:11,020 And going into a 60% design is added detail, like really getting into everything fits together 283 00:26:11,020 --> 00:26:15,960 and how deep we have to excavate for the foundations and kind of taking in more detailed information. 284 00:26:16,560 --> 00:26:20,300 So just want to kind of make that clarification because sometimes it gets a little bit confusing. 285 00:26:20,960 --> 00:26:28,000 So we did complete the 30% design back in August of 2022, so 3 years ago, and since then 286 00:26:28,000 --> 00:26:34,660 we've been working on the 60% design, however, in order to complete that 60% design and get the 287 00:26:34,660 --> 00:26:40,400 geological data that we need to refine it. We've been trying to complete the geotechnical 288 00:26:40,400 --> 00:26:45,560 investigations associated with that. So when we began those investigations back in 2023, 289 00:26:45,560 --> 00:26:51,820 three, we were stopped with a SQL challenge that we've heard about many times and we're asked 290 00:26:51,820 --> 00:26:54,900 to do additional SQL analysis for those geotechnical investigations. 291 00:26:55,760 --> 00:27:01,700 And so we've been working on that and have prepared a final EIR for that work, which is scheduled 292 00:27:01,700 --> 00:27:07,020 to go to the board on September 9th, but we will talk about that a little bit later, but 293 00:27:07,020 --> 00:27:12,820 just going through the rest of the design process here, we've been kind of waiting for that 294 00:27:12,820 --> 00:27:18,780 certification to resume those investigations, and we're hoping to complete the 60% 295 00:27:18,780 --> 00:27:24,160 design by late 2026 next year if those investigations are able to go forward this year. 296 00:27:27,680 --> 00:27:33,200 And then for our full design completion or the 100% design that's anticipated for late 2028, 297 00:27:33,220 --> 00:27:38,480 and that would be a full set to get the contractor, the information they need to build the project. 298 00:27:39,160 --> 00:27:44,180 But in between there, we'd also have a 90% design that would be done in 2027, that's not listed here, 299 00:27:44,180 --> 00:27:49,320 that's another step. And we go through those steps with the percentages and there's kind 300 00:27:49,320 --> 00:27:55,020 of a process that we use where the engineer of record, the design team puts together this package 301 00:27:55,020 --> 00:28:00,960 at the each design level and value water staff and the subject matter experts review that and then 302 00:28:00,960 --> 00:28:05,500 we send it to DSOD to review that and do their technical analysis and then we gather all those 303 00:28:05,500 --> 00:28:10,460 comments from the subject matter experts and DSOD and compile those and incorporate those into 304 00:28:10,460 --> 00:28:16,120 next design level. So that's kind of a step-by-step process we use for all of our projects, including the 305 00:28:16,120 --> 00:28:22,760 the damn safety projects that we're currently working on. And so this is just a table to just kind 306 00:28:22,760 --> 00:28:27,340 of summarizes those milestones, some of which read it, covered in her slides, and then the design 307 00:28:27,340 --> 00:28:32,100 milestones here, and then just this really is just to kind of lay out for our best-case scenario 308 00:28:32,100 --> 00:28:37,400 of completing these major milestones, and then estimating the construction start date in mid-2029. 309 00:28:37,400 --> 00:28:44,420 And like I said, that's the best case scenario, but we have been making progress on all of these efforts throughout time. 310 00:28:44,500 --> 00:28:47,500 But there have been challenges like the geotechnical investigations, 311 00:28:48,120 --> 00:28:52,100 Sequoanalysis that have slowed us down by about two years on the design process. 312 00:29:00,410 --> 00:29:00,530 Okay. 313 00:29:03,250 --> 00:29:04,070 Good afternoon. 314 00:29:04,570 --> 00:29:05,730 Chair, Mr. Mary, members of the board. 315 00:29:05,750 --> 00:29:07,290 They're in Taylor, Chief Financial Officer. 316 00:29:08,750 --> 00:29:13,430 I'm going to talk about the next slide, which provides information on cost and affordability 317 00:29:13,430 --> 00:29:21,410 of the Pachika Reservoir Expansion Project. The total estimated cost with inflation as shown in the adopted 318 00:29:21,410 --> 00:29:28,970 CIP is 2.732 billion and that's based on the 30% design that Ryan just spoke about that was 319 00:29:28,970 --> 00:29:36,270 completed in 2022. It is an expensive project and value water has undertaken a multi-pronged approach 320 00:29:36,270 --> 00:29:43,150 to reduce financial impact on the community. Starts with securing a $1.4 billion water infrastructure 321 00:29:43,150 --> 00:29:50,350 and finance innovation act loan or wifio loan that covers up to 49% of planning and design costs. 322 00:29:51,530 --> 00:29:58,390 The key benefit of that particular loan is that it has a customizable loan repayment schedule. 323 00:29:59,430 --> 00:29:59,970 And so the currently... 324 00:30:00,000 --> 00:30:08,540 We assumed with you a loan debt service schedule reflects backloaded principal payments that start in FY55 with the payoff in FY67. 325 00:30:09,640 --> 00:30:20,380 Pushing principal repayments toward the end of the amirization period helps relieve near-term water rate pressure and, as the board knows, that's a front and center issue for valley water today. 326 00:30:20,380 --> 00:30:26,120 A note for you is that interest expense over the long-term can be mitigated by the ability 327 00:30:26,120 --> 00:30:30,840 to pay off the loan sooner with no prepayment penalty if financial conditions weren't. 328 00:30:31,120 --> 00:30:35,740 So we can push forward those principal payments if we need to and if the board desires. 329 00:30:37,900 --> 00:30:45,560 Another thing that has been done is that staff was able to secure a $504 million conditional grant 330 00:30:45,560 --> 00:30:50,780 from the California Water Commission's Water Storage investment program back in 2018. 331 00:30:50,780 --> 00:30:58,260 That includes 24.2 million of early funding for planning and permitting, which valley water has already received. 332 00:30:59,020 --> 00:31:03,920 And in addition, staff has been exploring cost sharing opportunities with external partners. 333 00:31:05,120 --> 00:31:12,960 When it comes to the water rate projection that the board has seen, that projection has assumed 35% partnership participation. 334 00:31:13,940 --> 00:31:21,060 And that particular assumption was discussed by the board back in 2021 and directed by the board to be the assumption. 335 00:31:25,280 --> 00:31:37,100 The grant with that 35% partnership participation means from a water rate modeling perspective is that what we've loaded into the model is the full cost of the project. 336 00:31:37,100 --> 00:31:42,680 the 2.732 billion plus the cost of financing, including the WIFI alone. 337 00:31:43,800 --> 00:31:50,060 And then we calculate the 35% partnership payments, which comes into the financial model 338 00:31:50,060 --> 00:31:51,080 as a revenue source. 339 00:31:51,240 --> 00:31:52,620 So it offsets the costs. 340 00:31:53,200 --> 00:31:54,200 And that's what is included. 341 00:31:54,240 --> 00:31:59,600 That's the assumption that's baked into the pause report projection that the board 342 00:31:59,600 --> 00:32:00,700 has seen. 343 00:32:01,340 --> 00:32:07,080 So with that, the groundwater production charges would cover the remaining cost of the 344 00:32:07,080 --> 00:32:13,840 of the project after the wizard grant and after any partnership participation revenues come in. 345 00:32:16,180 --> 00:32:23,600 So now, CEO Richardson mentioned a new revised cost update. And so we don't have a slide on that. 346 00:32:23,620 --> 00:32:37,060 So I'm going to give that information to you verbally. The latest rough estimate of costs for the 347 00:32:37,060 --> 00:32:44,360 million-dollar cost increase, almost 500 million dollars. That is still based on the 30% design, 348 00:32:44,960 --> 00:32:51,320 but incorporates current market conditions. For example, OCI, which was the firm that did this 349 00:32:51,320 --> 00:32:57,720 revised rough cost estimate, added tariff-based premiums on the applicable line item costs, 350 00:32:58,880 --> 00:33:04,480 so reflecting the tariff increases at this point in time for those particular line items. 351 00:33:05,200 --> 00:33:11,180 At this point in time, the estimate does not include cost increases based on the 60% design, 352 00:33:11,920 --> 00:33:13,820 which is in progress, as you know. 353 00:33:14,500 --> 00:33:22,220 Right now, staff anticipates that there would be a change in the 60% design in an increase 354 00:33:22,220 --> 00:33:28,260 related to a PG&E transmission line, and that is estimated to cost $65 million, so that 355 00:33:28,260 --> 00:33:34,580 2.22 billion dollar number does not include the impact of that PG&E transmission line. 356 00:33:35,200 --> 00:33:39,340 In addition, further investigations could reveal unexpected geological conditions 357 00:33:39,340 --> 00:33:43,700 that may require design changes that are not possible to estimate at this time. 358 00:33:44,460 --> 00:33:50,860 So as I mentioned, that estimate is rough, but it's the latest and greatest that we have at this 359 00:33:50,860 --> 00:33:56,760 point in time. So with that, the next question that the board may ask is, well, how does that 360 00:33:56,760 --> 00:34:01,720 impact the water rate projection, particularly for the North County zone W2. And so again, 361 00:34:01,800 --> 00:34:05,300 I don't have a slide to show you, but I do have the information that I'm going to share 362 00:34:05,300 --> 00:34:11,900 with you verbally. So the board may recall when you've looked at the pause report that was 363 00:34:11,900 --> 00:34:15,920 submitted back in February and with the with the public hearings on the water rate setting 364 00:34:15,920 --> 00:34:21,000 process that we had in April, you may recall that for the North County zone W2 groundwater chart 365 00:34:21,000 --> 00:34:29,200 projection, that staff was projecting 9.9% increases from FY27 through FY34. So for the next 366 00:34:29,200 --> 00:34:35,420 eight years, tapering down to 7% after that. With this constant increase to the Pacheco 367 00:34:35,420 --> 00:34:42,720 project, moving from 2.7 billion to 3.2 billion, now we would project 10%, so we're in the 368 00:34:42,720 --> 00:34:47,660 double digits now, 10% increases in that North County's own W2 groundwater charge projection 369 00:34:47,660 --> 00:34:56,360 for the next eight years, and then not tapering to 7% but continuing at 9% for the next two years after, so FY35 and FY36. 370 00:34:57,600 --> 00:34:59,980 And that includes the assumption of... 371 00:35:00,000 --> 00:35:28,440 A 35% partnership participation. Now, if, for a scenario without partnership participation, 0% partnership participation, that scenario, then, would reflect 10.3% annual water rate increases from FY27 to FY34 and then again 9% from FY35 to FY36. So that would be the cost impact of this updated. 372 00:35:30,000 --> 00:35:39,040 Rough cost estimate and just another term to kind of put that estimate in for for the board is that when when the project is done 373 00:35:39,660 --> 00:35:46,300 And an operational based on this new cost estimate the impact to the average household in terms of the monthly 374 00:35:46,300 --> 00:35:58,280 Monthly bill would range from $11 to $16 per month in terms of incremental costs to the average household for the project with 35% partnership participation 375 00:35:58,280 --> 00:36:07,620 And would range from $20 to $27 per month in terms of an incremental monthly impact to the average household for the project without partnership participation. 376 00:36:08,940 --> 00:36:14,800 And that's all I have to share on that and I'll pass it along to Erin at this point. 377 00:36:16,180 --> 00:36:17,220 Good afternoon, Chair. 378 00:36:18,140 --> 00:36:19,300 Good afternoon, Chair. 379 00:36:19,300 --> 00:36:20,840 Mr. Mayor and Honourable Members of the Board. 380 00:36:21,200 --> 00:36:31,280 I'm Aaron Baker, Chief Operating Officer of the Water Utility, and today I will provide a status update on the approvals required from the Bureau of Reclamation in order to construct the Pachaco Reservoir expansion project as envisioned. 381 00:36:32,060 --> 00:36:36,960 I will also provide some information on where the project fits into the Water Supply Master Plan 2015. 382 00:36:38,020 --> 00:36:43,240 Currently, Valley Water receives water from San Luis Reservoir via Bureau of Reclamation pump stations and pipelines. 383 00:36:43,240 --> 00:36:55,480 The proposed Bichaco Reservoir expansion project would rely on the Bureau's Bichaco condo of pipeline to deliver water from St. Louis Reservoir into the new reservoir and convey water from the new reservoir back into valley water system. 384 00:36:56,320 --> 00:36:59,700 To accomplish this, we will need several approvals from the Bureau. 385 00:37:00,600 --> 00:37:12,400 With four critical approvals bolted here. Approval for a turnout connection, we will need permission to construct a new turnout structure on the Bureau's Bichaco condo pipeline to move water in and out of the new reservoir. 386 00:37:13,060 --> 00:37:19,140 Long-term worn-out contract, we'll need authorization to use Bureau Facilities to move non-central 387 00:37:19,140 --> 00:37:24,240 valley project waters such as state water project supplies into and out of the new reservoir. 388 00:37:25,360 --> 00:37:31,520 Approval to store central valley project water in the new reservoir. We need permission to store 389 00:37:31,520 --> 00:37:42,380 central valley project water often abbreviated as CBP water into the new reservoir. This is a 390 00:37:42,380 --> 00:37:47,180 and fourth, we need permission for the new pumping plant and electrical facilities. 391 00:37:47,700 --> 00:37:52,180 We need approval to construct a pumping plant and associated electrical transmission facilities 392 00:37:52,180 --> 00:37:56,460 on bureau land near the new turnout location. Next slide, please. 393 00:37:58,870 --> 00:38:00,410 After consultation with senior 394 00:38:00,410 --> 00:38:06,630 reclamation officials, the outlook is challenging. Storing CVP water in the new reservoir. 395 00:38:07,310 --> 00:38:11,750 At this time, the bureau does not support allowing CVP water to be stored in the new reservoir. 396 00:38:11,750 --> 00:38:20,070 This is a significant setback as it greatly limits the project's viability and reduces opportunities for partnerships with other CVP contractors. 397 00:38:21,410 --> 00:38:23,670 Permission for a new turnout and elect facilities. 398 00:38:24,530 --> 00:38:31,850 While possible, approvals for a new turnout connection in a related infrastructure or require extensive engineering analysis and environmental review, 399 00:38:32,450 --> 00:38:38,090 this will be a lengthy process compounded by the Bureau's current staffing shortages and competing priorities. 400 00:38:39,110 --> 00:38:44,190 or an at contract. It will be possible to obtain it. It could be possible to obtain a 401 00:38:44,190 --> 00:38:49,490 worn at contract to move the non-CVP water into the reservoir, but securing a long-term 402 00:38:49,490 --> 00:38:56,230 contract will take years and may come with restrictive or unfavorable terms. In short, the 403 00:38:56,230 --> 00:39:00,830 Bureau doesn't support using CVP water in the new reservoir, and with their resource constraints, 404 00:39:01,310 --> 00:39:06,950 the timing for seeking other project-specific approvals is not favorable. Next slide, please. 405 00:39:09,130 --> 00:39:13,370 So where does this project fit into our draft water supply of Master Plan 2050? 406 00:39:14,050 --> 00:39:18,770 The draft plan identifies future water shortages and underscores the need for new storage projects, 407 00:39:19,210 --> 00:39:21,910 particularly given the uncertainties surrounding groundwater banking. 408 00:39:22,890 --> 00:39:27,610 The Pacheco Reservoirs Ganshin project is not included in this staff recommended lower cost portfolio, 409 00:39:28,230 --> 00:39:30,790 due to which relatively high cost compared to some other options. 410 00:39:31,630 --> 00:39:36,230 Currently included in the lower cost portfolio is the San Luis Reservoir and Large Ruit project, 411 00:39:36,230 --> 00:39:40,990 also known as the Siskraes, groundwater banking, the Delta convenience project, pure water 412 00:39:40,990 --> 00:39:47,110 silicon valley, and South County recharge. However, cost is not the only factor in determining 413 00:39:47,110 --> 00:39:52,150 a project's value. The project remains the particular project remains an important alternative 414 00:39:52,150 --> 00:39:59,970 that can provide reliable benefits if other lower cost alternatives are delayed, downsize, or 415 00:40:00,000 --> 00:40:06,320 The water supply master plan actually recommends continuing to participate in the planning of alternative projects such as Pichaco. 416 00:40:07,500 --> 00:40:16,080 As new projects materialize, or current projects change in costs and benefits, the water supply master plan is continuously adapting the its adaptive management process. 417 00:40:16,960 --> 00:40:26,620 So, if the Pichaco Reservoirs Fange and Project is not able to be implemented as envisioned, such as not being able to store CVP water, what alternatives could provide similar benefits. 418 00:40:26,620 --> 00:40:32,380 The team is further analyzing alternatives, such as expanding a local reservoir like 419 00:40:32,380 --> 00:40:37,560 Clareau, increasing participation in sites or DCP, and developing new groundwater 420 00:40:37,560 --> 00:40:38,560 banking opportunities. 421 00:40:39,820 --> 00:40:43,520 While this is going on and in the meantime, staff will continue to focus on the lower 422 00:40:43,520 --> 00:40:49,020 cost portfolio, including CISC, Pure Water Silicon Valley, and groundwater banking next 423 00:40:49,020 --> 00:40:49,240 line. 424 00:40:54,150 --> 00:40:56,630 So that wraps up our summary today, Board. 425 00:40:56,630 --> 00:41:02,710 and I hope that you've got the information that you needed to be able to make an informed decision on whether 426 00:41:02,710 --> 00:41:08,810 Valley Waters should be referred with this project. And as Aaron said, we will be coming back with additional information. 427 00:41:08,810 --> 00:41:14,890 Should you make that decision that will tell you what we will be doing to explore alternative options in the future? 428 00:41:15,610 --> 00:41:17,850 And with that, staff stands open for questions. 429 00:41:19,800 --> 00:41:31,400 Thank you, Melanie. Thank you, staff, big panel of staff. So I have a formal written motion 430 00:41:31,400 --> 00:41:37,440 that I've been thinking about. So I ask you all to allow me to do that after discussion 431 00:41:37,440 --> 00:41:42,700 and after we've all had our opportunities to discuss, we'll listen to public comment. 432 00:41:44,100 --> 00:41:46,280 So I have a direct umbrella. 433 00:41:49,390 --> 00:41:49,930 Thank you. 434 00:41:49,930 --> 00:41:51,050 So my question is. 435 00:41:52,170 --> 00:41:54,650 So what would that impact the remaining 436 00:41:54,650 --> 00:41:57,330 with you dollars that we have? 437 00:41:57,430 --> 00:41:58,790 Do we have to give those up? 438 00:41:58,950 --> 00:41:59,890 How do we resource? 439 00:42:00,150 --> 00:42:02,150 We've already committed some of those dollars. 440 00:42:02,350 --> 00:42:04,910 What is the impact going to have on those dollars? 441 00:42:05,350 --> 00:42:05,790 Sure. 442 00:42:05,910 --> 00:42:06,850 Thank you for the question. 443 00:42:07,070 --> 00:42:08,370 So it was for guard to the wiffie alone. 444 00:42:08,730 --> 00:42:11,490 So we we've secured a 1.4 billion dollar loan. 445 00:42:12,190 --> 00:42:20,290 It's there's a there's a master agreement for about 10 loans. We've executed on one loan. We have not drawn on that loan. 446 00:42:21,510 --> 00:42:30,850 So when you say what is the impact if if if the board were to choose to delay the project or not move forward with the project. 447 00:42:31,090 --> 00:42:39,470 What we would do is begin discussions with EPA to cancel that particular loan. Obviously if the board chooses to continue on with the project. 448 00:42:39,470 --> 00:42:44,690 we would continue on with the loan, and we haven't drawn on it on the first loan yet, but we would 449 00:42:44,690 --> 00:42:49,910 draw when the time comes. So just to be clear on the question and ask, those dollars are 450 00:42:49,910 --> 00:42:55,450 specifically used for to pay a particular, no other use for those dollars would be, 451 00:42:55,450 --> 00:43:00,350 that's right, under the loan of just particular. Please, that's correct. Is that correct? Thank you. 452 00:43:00,450 --> 00:43:01,590 That answers my question. 453 00:43:04,380 --> 00:43:05,200 Any other questions? 454 00:43:09,170 --> 00:43:13,110 Okay, all right, that would be nice and rude. 455 00:43:13,190 --> 00:43:16,490 These are just questions, saving my comments to afterwards. 456 00:43:17,370 --> 00:43:24,950 So the $3.2 billion new total, why wasn't that reflected in the PowerPoint? 457 00:43:28,480 --> 00:43:33,880 Yes, thank you for the question, so that cost estimate is very fresh. 458 00:43:34,060 --> 00:43:34,900 It came in. 459 00:43:35,000 --> 00:43:36,000 I think it was on Friday. 460 00:43:36,240 --> 00:43:37,760 So just a couple of days ago. 461 00:43:37,760 --> 00:43:44,200 So that's not in that time to amend the amend the PowerPoint side presentation for sure, Friday. 462 00:43:44,940 --> 00:43:52,520 I would like to see that more transparent for the public, so I hope that next time that kind of information can be shared. 463 00:43:52,980 --> 00:44:02,340 I also want to note that 3.2 billion is next of the 35% participation at the board. 464 00:44:03,160 --> 00:44:07,820 years ago said was required for us to move forward with this project. 465 00:44:08,900 --> 00:44:12,800 Isn't net of that theoretical 35%. 466 00:44:12,800 --> 00:44:16,100 The 3.222 billion would be the full cost. 467 00:44:16,840 --> 00:44:25,340 Okay, so and does it include how much of that 3.2 billion is mitigations? 468 00:44:27,980 --> 00:44:32,280 Yeah, that's still the 50 million dollar placeholder that we put in to the cost. 469 00:44:32,280 --> 00:44:35,880 Do you think $50 million is an accurate, 470 00:44:35,980 --> 00:44:36,580 I do. 471 00:44:36,580 --> 00:44:36,880 I do. 472 00:44:38,020 --> 00:44:38,680 I do for now. 473 00:44:39,120 --> 00:44:39,840 Based on what we know. 474 00:44:40,440 --> 00:44:43,940 How much medications cost and continue to cost with Anderson? 475 00:44:45,000 --> 00:44:48,260 Anderson is much further along in the negotiations with the regulatory agencies. 476 00:44:48,620 --> 00:44:49,140 Approximately. 477 00:44:49,440 --> 00:44:51,060 I don't have the number off top of my head. 478 00:44:51,340 --> 00:44:52,000 Hundreds of millions? 479 00:44:52,580 --> 00:44:52,600 No. 480 00:44:54,440 --> 00:44:54,840 Okay. 481 00:44:55,120 --> 00:44:59,540 I think it's best to put in a more realistic. 482 00:45:02,060 --> 00:45:08,220 assessment of mitigation costs. I'm also wondering, does that include finance charges? 483 00:45:12,100 --> 00:45:17,980 The 3.2 billion, that's the total project costs that we put in our CIP. There's not included finance charges. 484 00:45:17,980 --> 00:45:20,200 Finance charges in project. 485 00:45:20,340 --> 00:45:21,420 In project cost. 486 00:45:21,420 --> 00:45:26,420 We never put our finance charges in our total project costs in the CIP for any project. 487 00:45:28,000 --> 00:45:31,220 Okay, then do you provide it separately? 488 00:45:31,960 --> 00:45:36,940 We have provided separately for this project and Darren Taylor's presented that a few times. 489 00:45:37,540 --> 00:45:40,160 So, that's here again, I'm Darren Taylor. 490 00:45:40,500 --> 00:45:47,700 So, if the if the with the alone that I thought was ninety three million dollars. 491 00:45:48,000 --> 00:45:52,680 That's the number in December. 492 00:45:52,840 --> 00:45:57,300 In December 2022 there's a ninety three million dollar with the alone that closed, right? 493 00:45:58,480 --> 00:46:00,580 I don't have the exact number, but it's about that. 494 00:46:00,740 --> 00:46:01,260 Approximately. 495 00:46:01,880 --> 00:46:09,140 And I remember you saying that the payback application for that was about 294 million. 496 00:46:09,780 --> 00:46:12,800 Something about, I don't have the exact number, but it was long in those lines. 497 00:46:13,240 --> 00:46:22,700 Okay. So if a, you know, less than $100 million loan had a just under $300 million payback 498 00:46:23,840 --> 00:46:35,980 obligation, then a 1.4 billion dollar loan would have approximately a 3.3 billion dollar payback 499 00:46:35,980 --> 00:46:36,740 obligation. 500 00:46:39,740 --> 00:46:42,680 It's going to be in that neighborhood, again, I don't have the correct number. 501 00:46:42,840 --> 00:46:48,520 Given that the finance chart is in the payback obligation, actually our larger than the 502 00:46:48,520 --> 00:46:57,020 project costs, and therefore more than jubbles the cost of the project, perhaps that could be 503 00:46:57,020 --> 00:47:03,780 considered an aspect of that. So that actually would then arguably double the cost to 504 00:47:04,060 --> 00:47:14,940 6.4 billion or so. So in that, so that is a good. Okay, that those were really my questions here. 505 00:47:14,940 --> 00:47:15,560 Here, 506 00:47:18,000 --> 00:47:22,660 oh yeah, have you included the legal costs that have spent so far? 507 00:47:22,940 --> 00:47:31,860 I know that that OSHA challenge that was referred to was a challenge that we lost and the 508 00:47:31,860 --> 00:47:39,340 challenge are one and as a result we had to pay all of the legal fees and costs of the 509 00:47:40,100 --> 00:47:50,200 as the court documents clearly show and perhaps, you know, given that this was a pretty 510 00:47:50,200 --> 00:47:58,000 expensive lawsuit in itself, are we also including legal related fees, and we know also 511 00:47:58,000 --> 00:48:03,820 that if we continue this project, the same parties that suit us before, including the 512 00:48:03,820 --> 00:48:12,000 I'm a mutton indigenous tribal band, the Sierra Club, and private landowners, 513 00:48:12,940 --> 00:48:17,820 but well, likely to see us again. Are we including those in the budget? 514 00:48:20,860 --> 00:48:23,220 As far as the projected costs, is that what you're asking? 515 00:48:24,020 --> 00:48:29,020 Yeah. Yeah, there are placeholders for fees that associated with that. 516 00:48:29,280 --> 00:48:32,580 And how much money do you have set aside for legal costs? 517 00:48:32,980 --> 00:48:34,080 I don't know off top of my head. 518 00:48:35,200 --> 00:48:47,880 So, okay, it'd be important to have that called out too, especially given all of the opposition by very diverse stakeholders to this project. 519 00:48:48,460 --> 00:48:50,280 So, okay, those are my questions. 520 00:48:50,380 --> 00:48:52,840 I really appreciate your updated number. 521 00:48:53,200 --> 00:48:58,960 Numbers so far in the amount of time and the spirit in which you're provided this is very helpful. 522 00:48:58,960 --> 00:49:02,900 And I know that together, we'll reach an appropriate resolution. 523 00:49:03,760 --> 00:49:04,920 So thank you. 524 00:49:07,240 --> 00:49:08,180 Director Ben. 525 00:49:11,170 --> 00:49:12,210 Thank you. 526 00:49:12,250 --> 00:49:14,230 Erin, I know you went over this a bit. 527 00:49:15,670 --> 00:49:20,410 But I was hoping maybe you could restate or say again, especially for, 528 00:49:20,870 --> 00:49:23,570 I'm looking at how many people we have online. 529 00:49:23,930 --> 00:49:29,070 I think my eyes aren't that great, but I think we've got like 150 people listening in. 530 00:49:29,070 --> 00:49:35,550 which is absolutely wonderful and fantastic that we have all these folks interested in this project. 531 00:49:37,210 --> 00:49:47,210 I was in on this board when we moved, we decided to move forward. So I was wondering if you could or someone could do a little, a little more of a history lesson of how did we get here. 532 00:49:47,550 --> 00:49:49,650 I was going to do that. Oh, you were. Okay. Awesome. 533 00:49:50,370 --> 00:49:52,350 I am deep story. Okay. 534 00:49:52,350 --> 00:49:57,990 our guy. Meaning that the old is one. All right. All the service. 535 00:49:58,010 --> 00:49:59,770 We have so many people here interested. 536 00:50:00,000 --> 00:50:22,540 But I think it would be useful for them to understand how do we get here and then airing you do it now, it's about, you talked about the context of the water supply master plan and how this fits. And so I, I, I, I just want to be able to understand, you know, the, as I'm learning, the importance of storage. If we don't move forward with this, we still have this water supply master plan where we're planning to 2050. 537 00:51:25,920 --> 00:51:29,200 Thank you very much for allowing me to speak. 538 00:51:30,640 --> 00:51:35,440 I am definitely liking the direction that I'm hearing that this meeting is going so far. 539 00:51:35,980 --> 00:51:40,740 Of course, you know, we have to wait for the final payoff to make sure that it actually happens. 540 00:51:41,660 --> 00:51:45,600 Something from the diehard meeting our movie came to mind. 541 00:51:45,600 --> 00:51:48,400 It's like, welcome to the party, pal. 542 00:51:49,440 --> 00:51:54,720 We have been telling you all for years now that this is not a good project. 543 00:51:55,400 --> 00:52:05,560 There have been lots of my own constituents, our neighbors, but I've talked to my representative from District 6. 544 00:52:06,960 --> 00:52:09,680 There have been organizations, professional organizations. 545 00:52:09,680 --> 00:52:17,920 there have been state organizations, federal organizations, lots of people have been telling 546 00:52:17,920 --> 00:52:24,140 you that this is not a good idea. There is something rampant that is happening with our politicians 547 00:52:24,140 --> 00:52:26,560 and they're not listening to the people. 548 00:52:28,650 --> 00:52:31,810 We are telling you this was a terrible idea. 549 00:52:36,910 --> 00:52:37,550 I'm standing 550 00:52:37,550 --> 00:52:44,310 The terabyte deals, so I hope you eventually get to the end and say, no, we do not want to do 551 00:52:44,310 --> 00:52:49,110 this, we do not want to follow up on this, we do not want to keep this on the books and 552 00:52:49,110 --> 00:52:51,830 keep drawing more millions of dollars. 553 00:52:52,250 --> 00:52:55,310 I don't know, it seems like 17 millions of already been spent on this. 554 00:52:55,410 --> 00:52:56,910 Maybe that's right, maybe that's wrong. 555 00:52:58,090 --> 00:52:59,490 Thank you, Ms. Eisenberg, for that comment. 556 00:52:59,490 --> 00:53:00,870 I had a little note for myself. 557 00:53:00,910 --> 00:53:06,270 It says, anytime you're talking about money, quote, have a slide for that. 558 00:53:06,270 --> 00:53:11,290 every single time so that we can understand what's going on. 559 00:53:13,080 --> 00:53:18,880 I don't understand you're talking about all this money and 30% of the project, 60% of the project. 560 00:53:19,240 --> 00:53:23,780 Right, all these little things are manipulating just basically say to yourself, 561 00:53:24,520 --> 00:53:28,320 what are my constituents saying, do they want this? No. 562 00:53:29,080 --> 00:53:35,440 Let's look at a different direction. Let's cover our water. Let's put some solar panels on top of those covers. 563 00:53:35,440 --> 00:53:48,580 You know, let's really do those very basic things and then we may have a new outlook and we may be able to say, look, we don't need to have these giant storage units anymore because we've done such a good job. 564 00:53:51,460 --> 00:53:52,560 Listen to us. 565 00:53:53,620 --> 00:53:54,580 Your constituents. 566 00:53:56,680 --> 00:53:57,720 District six. 567 00:53:59,280 --> 00:54:00,240 Listen to us. 568 00:54:00,460 --> 00:54:01,300 Thank you. 569 00:54:01,420 --> 00:54:02,220 Thank you, sir. 570 00:54:08,930 --> 00:54:09,490 Yes. 571 00:54:12,650 --> 00:54:13,250 Yes. 572 00:54:13,250 --> 00:54:22,250 on Wednesday. Okay, we have Peter Van Dyke. Good afternoon, Mr. Van Dyke. Good afternoon, 573 00:54:22,450 --> 00:54:30,170 Arnold Board members, chair attorney. Yeah, I think director, I should actually ask a lot of 574 00:54:30,170 --> 00:54:35,270 questions. I'm going to ask regarding finances. This is a very aggressive and huge project. 575 00:54:35,350 --> 00:54:42,870 And I'm just wondering about the cost benefit analysis on this one. And I'm because I'm the chair 576 00:54:42,870 --> 00:54:49,830 the Agwater Committee. I think it's important that we know the impact on agricultural water rates 577 00:54:51,130 --> 00:54:56,750 because, you know, as you all well knows, Ag is struggling pretty hard on this in this county, 578 00:54:56,970 --> 00:54:58,970 because it's an urban county now in the longer and rural. 579 00:55:00,000 --> 00:55:05,440 And I'm wondering if perhaps Darren and events can put this on the agenda for the next 580 00:55:05,440 --> 00:55:08,580 ag, water advisory committee meeting. 581 00:55:10,600 --> 00:55:14,920 So I might all contact your staff and the clerk to get 582 00:55:14,920 --> 00:55:18,360 this on the agenda if we can, because I think it's very, very important that they hear about 583 00:55:18,360 --> 00:55:23,620 the costs and the benefits for this project. So I'd appreciate that if we could do that. 584 00:55:23,880 --> 00:55:25,080 And thank you for letting me speak. 585 00:55:25,660 --> 00:55:27,240 Okay. We'll do that by the way. 586 00:55:27,460 --> 00:55:28,420 Thank you. 587 00:55:28,420 --> 00:55:29,640 Mr. Gava. 588 00:55:37,610 --> 00:55:40,770 Good afternoon. My name is Juan Pablo Galvan Martinez, senior 589 00:55:40,770 --> 00:55:49,860 ladies manager for. How far can you hear me? Yes sir. Okay great. Good 590 00:55:49,860 --> 00:55:53,400 afternoon. My name is Juan Pablo Galvan Martinez, senior land use manager for 591 00:55:53,400 --> 00:55:59,520 save on Diablo. I'd just like to thank staff for the work on this for the 592 00:55:59,520 --> 00:56:04,020 valley water leadership, their deliberations, and they're thinking about this 593 00:56:04,020 --> 00:56:10,480 As a project, obviously we have come to a point where it seems like some realities have 594 00:56:10,480 --> 00:56:18,760 become quite stark and I'm here commenting for you today to urge you to not pursue this 595 00:56:18,760 --> 00:56:25,020 project further. We care about drinking water, we care about natural resources, we care about 596 00:56:25,020 --> 00:56:33,660 protecting land that is already officially designated as protected and this project does not 597 00:56:34,020 --> 00:56:41,340 team to yield the public benefits that its proponents originally envisioned when this 598 00:56:41,340 --> 00:56:44,000 work started so long ago. 599 00:56:44,560 --> 00:56:50,580 We would really appreciate if you the Valley Board decision makers decided to suspend 600 00:56:50,580 --> 00:56:58,040 this project, terminate further work on it, and we are with our conservation allies, absolutely 601 00:56:58,040 --> 00:57:06,200 open to working with all stakeholders to pursue liable, long-term strategies to solve our 602 00:57:06,200 --> 00:57:12,820 crucial water issues in the face of a hotter, more extreme climate now and in the future. 603 00:57:13,200 --> 00:57:18,260 Thank you so much. Have a good day. Thank you sir. Katia Rubin. 604 00:57:28,940 --> 00:57:29,640 Good afternoon, Mr. 605 00:57:34,280 --> 00:57:34,300 Rubin. 606 00:57:34,300 --> 00:57:35,200 She knew this. 607 00:57:35,900 --> 00:57:36,480 Oh, through there. 608 00:57:36,620 --> 00:57:37,320 Through there. 609 00:57:37,360 --> 00:57:37,520 There. 610 00:57:38,620 --> 00:57:39,980 Can you hear me? 611 00:57:44,050 --> 00:57:44,430 Yes. 612 00:57:47,050 --> 00:57:48,030 We can do. 613 00:57:48,210 --> 00:57:48,990 Yes, we can hear you. 614 00:57:49,010 --> 00:57:49,710 Can you hear me? 615 00:57:50,230 --> 00:57:50,470 Yes. 616 00:57:51,050 --> 00:57:51,530 Good afternoon. 617 00:57:55,890 --> 00:57:56,390 OK. 618 00:57:57,970 --> 00:57:58,010 Absolutely. 619 00:57:58,750 --> 00:57:59,690 Good afternoon, Chair. 620 00:58:00,070 --> 00:58:09,790 If the board is thrilled to continue to talk 621 00:58:12,350 --> 00:58:14,690 for a little bit. 622 00:58:16,690 --> 00:58:24,310 a more project, immediately the board decides to plan, will be out of date the moment it is approved. 623 00:58:24,930 --> 00:58:32,870 Luckily, Pacheco, on a central for future water supply, since it is not included in the low costs scenario, the district is currently prioritizing. 624 00:58:33,790 --> 00:58:39,010 Also, the situation with Pacheco needs to be discussed with the California water commission. 625 00:58:39,010 --> 00:58:44,110 If it has been discussed, I'm wondering if you could share their response. 626 00:58:45,710 --> 00:58:49,270 If not, this should happen as soon as possible. 627 00:58:55,140 --> 00:58:56,760 I'm sure. 628 00:59:00,260 --> 00:59:01,000 I'm sorry. 629 00:59:04,420 --> 00:59:04,660 I'm sorry. 630 00:59:08,300 --> 00:59:09,540 I'm sorry. 631 00:59:09,540 --> 00:59:10,980 I'm sorry. 632 00:59:10,980 --> 00:59:11,000 I'm sorry. 633 00:59:11,000 --> 00:59:12,000 I'm sorry. 634 00:59:12,000 --> 00:59:17,940 storage enhancement projects. These items should be overseen by the water supply and demand management 635 00:59:17,940 --> 00:59:21,640 committee. Thank you for your consideration. 636 00:59:24,370 --> 00:59:29,330 Thank you, Mr. Irvin. And I believe we're, we're due to 637 00:59:29,330 --> 00:59:35,930 go back to the commission in October. That's correct. And when the end of October. 638 00:59:40,570 --> 00:59:40,750 Do you 639 00:59:41,890 --> 00:59:46,590 to respond to you, I think it's not told where that was. Towards the end of our 640 00:59:46,590 --> 00:59:51,810 tour with that we're appearing before the commissioner, right? Okay, 641 00:59:54,430 --> 00:59:56,350 do we have? 642 00:59:58,050 --> 00:59:59,890 That's, that's, so you have, I mean, doesn't discuss. 643 01:00:17,550 --> 01:00:20,650 We're meeting with them at the end of October. 644 01:00:40,920 --> 01:00:44,200 Yeah, through the board, it looks like 645 01:00:54,280 --> 01:00:58,560 the board. She is unmuted. She's just not speaking into her make at the moment. 646 01:00:58,860 --> 01:01:00,860 Hello Ms. Kleinhaus. Who is listening? 647 01:01:03,460 --> 01:01:06,420 Can you hear me? Yes. Yes. 648 01:01:07,820 --> 01:01:10,520 My name is Shani Kleinhaus, I'm the informant. 649 01:01:10,780 --> 01:01:13,200 I get through the Santa Clara Valley Bird Alliance. 650 01:01:13,760 --> 01:01:22,160 We support the CRCOT.airvan provided. And repeatedly, we are organization 651 01:01:22,160 --> 01:01:30,020 as the opposition to the Pacheco Resort or Expansion Project, we need to believe that it will 652 01:01:30,020 --> 01:01:39,260 have devastating ecological impacts on the regional scale with benefits if any latest news. 653 01:01:39,580 --> 01:01:46,500 We see the Bureau of Reclamation refuses to provide an even more importantly water to the 654 01:01:46,500 --> 01:01:59,040 And they state not precinct a lot of money to be needed for this project to us, that should be the product. 655 01:01:59,680 --> 01:02:04,320 So again, we ask you to about particular reservoir expansion project. 656 01:02:09,240 --> 01:02:10,820 Thank you Ms. Kindhouse. 657 01:02:11,660 --> 01:02:12,940 Anyone else? 658 01:02:13,180 --> 01:02:14,580 I have no further requests to speak. 659 01:02:15,420 --> 01:02:15,700 Okay. 660 01:02:15,700 --> 01:02:22,980 the request, this question, I start providing the history after we have the discussion. 661 01:02:23,440 --> 01:02:24,460 Yes, Director de Ruella. 662 01:02:24,740 --> 01:02:25,720 Yes, thank you, Chair. 663 01:02:27,160 --> 01:02:30,600 So we talked about suggested partners on this project. 664 01:02:31,760 --> 01:02:39,700 Recently, the loss for Keto's project in Keto Costa was disbanded as far as their expansion 665 01:02:39,700 --> 01:02:44,220 of the project and taken on partnerships, Valley Water was very engaged in that and director 666 01:02:44,220 --> 01:02:49,840 That's what I participated in those discussions, and there was many partners on that project. 667 01:02:50,560 --> 01:02:56,220 Have any of those partners committed to this project and do we know who they are? 668 01:02:56,780 --> 01:03:00,500 And what amount of dollars if so have been committed to this project? 669 01:03:00,700 --> 01:03:01,300 In partners? 670 01:03:03,040 --> 01:03:04,100 Yeah, I can answer that. 671 01:03:04,440 --> 01:03:08,980 So yeah, we do know who the partners were on the list of the care of suspension through the JPA of course. 672 01:03:08,980 --> 01:03:15,340 We haven't had any any in-depth discussions about partnership opportunities for those those agencies. 673 01:03:15,980 --> 01:03:19,780 Do we pursue that or I mean are we pursuing that? 674 01:03:20,120 --> 01:03:23,360 We have considered pursuing that but we haven't had any outreach recently. 675 01:03:24,140 --> 01:03:24,380 Okay, 676 01:03:28,050 --> 01:03:35,610 I'm not further so let me just let me just go back to historically a little bit to where we got here. 677 01:03:36,890 --> 01:03:46,010 four CEOs ago and three and three interim CEOs ago. So that's about almost 25 years. 678 01:03:46,410 --> 01:03:57,970 Director, I see all the stand Williams ran into a group of people who were the mayors of small towns in the valley. 679 01:03:57,970 --> 01:04:12,410 who were suffering after the last drought during that time and were sustaining over 45% of unemployment in their areas. 680 01:04:13,170 --> 01:04:22,190 They went to the governor and asked the governor if he could lead some kind of process to deal with water issues. 681 01:04:22,190 --> 01:04:28,300 They created the Latino water coalition and the reason they did that was because 682 01:04:28,950 --> 01:04:33,490 the majority of the legislature was now Latino. 683 01:04:34,390 --> 01:04:40,260 And so Schwarzenegger said, well, why don't you go talk to Latino public officials and have them support 684 01:04:40,830 --> 01:04:43,650 get the legislature to do something about this. 685 01:04:43,650 --> 01:04:47,050 Maybe put a bond on the ballot. 686 01:04:48,110 --> 01:04:58,550 So they came, they ran into CEO Williams at the time in conference in Los Angeles, who talked about it. 687 01:04:58,650 --> 01:04:59,890 And he said, oh, well, I have some Latino. 688 01:05:00,210 --> 01:05:12,830 Directors that might be interested in, so what happened was that we joined this Latino water coalition to advocate for a water barn. 689 01:05:13,490 --> 01:05:27,350 And so I became the Northern Vice President of that coalition and it went all over the state to advocate for a water barn. 690 01:05:27,350 --> 01:05:38,890 since we had none in the past, and so out of that came this water bond which was part of financing 691 01:05:38,890 --> 01:05:39,790 this project, 692 01:05:41,970 --> 01:05:46,750 the governor himself came to sign the bill right here at Valley Water, 693 01:05:47,330 --> 01:05:54,950 there in Anderson, personally signed the bill, and in a few years that that that law 694 01:05:54,950 --> 01:06:02,770 allowed the bonding bill and the bonding load will be put on the ballot. 695 01:06:04,010 --> 01:06:19,090 Within a few years when that bond was approved, many of the agencies that needed and were interested in building storage, 696 01:06:19,090 --> 01:06:27,450 There was tremendous competition in the state for the commission to award grants under that 697 01:06:27,450 --> 01:06:32,110 bonding of about $10 billion or altogether, a bonding. 698 01:06:33,490 --> 01:06:40,230 We were the proudest in the world to have been designated the number one priority on that 699 01:06:40,230 --> 01:06:40,530 bond. 700 01:06:40,730 --> 01:06:46,330 tremendous competition, including met, most of the carols, sites, everybody, few were number 701 01:06:46,330 --> 01:06:46,970 one. 702 01:06:47,130 --> 01:06:48,290 That's what Particle was. 703 01:06:48,290 --> 01:06:55,910 That's why we pursued it so much because it has so much to offer. 704 01:06:56,750 --> 01:06:58,010 So we pursued it since then. 705 01:06:58,230 --> 01:07:00,270 It's been almost 20 years. 706 01:07:00,690 --> 01:07:09,470 The staff has learned, has learned many, many things behind this, 707 01:07:09,470 --> 01:07:17,310 tremendous engineering of course, but also knowing how to raise funding, 708 01:07:17,310 --> 01:07:28,990 loan and so on, we pursued, as you know, a bill that allowed us binding capacities so that we could work on how to finance these kinds of projects. 709 01:07:29,530 --> 01:07:39,570 These projects, as I mentioned before, are complex, the humongous, the very expensive, no one has been able to build these projects. 710 01:07:41,250 --> 01:07:54,750 And all of the other agencies, there's only a couple left, there's three that also had not been able to finish, they were, they were, they received funding from the barn. 711 01:07:55,410 --> 01:08:06,150 There are, as you know, a lot of the carers is out, sites just went up from six billion to almost eight billion, and that's without talking about the interest that they're going to have to pay on that, okay. 712 01:08:06,150 --> 01:08:09,750 So it's not just 10, it's probably 20, if you look at it that way. 713 01:08:10,410 --> 01:08:14,890 These are very difficult projects and no one has been able to get there. 714 01:08:15,670 --> 01:08:19,630 We are trying to support these projects and we hope that sites will make it. 715 01:08:20,090 --> 01:08:22,030 We want to participate more in sites. 716 01:08:22,910 --> 01:08:29,370 We're talking to a lot of our carols to see if we could still be partners with them. 717 01:08:29,670 --> 01:08:33,470 So there's a lot that we're all trying to do with storage. 718 01:08:33,470 --> 01:08:40,550 But the very difficult projects, this is not something that everybody does every week. 719 01:08:41,110 --> 01:08:47,870 There isn't a project that is created every week because it's very difficult to do. 720 01:08:48,450 --> 01:08:49,590 Now we can do the engineering. 721 01:08:50,610 --> 01:08:56,370 I have no doubts and I don't think any of our staff has any doubt that we can engineer a project. 722 01:08:57,050 --> 01:09:06,790 But there has to be political willingness, there has to be funding available because we can put this kind of pressure on our water rates. 723 01:09:07,430 --> 01:09:21,530 We decided long ago that if it came to a point where we had to put the kind of pressure that looks like we need to do today on our constituents that we wouldn't do it. 724 01:09:21,530 --> 01:09:27,790 And I think that's where we are. So I have a formal motion because I always anticipated that 725 01:09:27,790 --> 01:09:34,710 long after I was gone on from the board my 30th year next year that it would be time for the board 726 01:09:34,710 --> 01:09:41,790 at that time to make a decision whether there's a go or not. And it looks to me like today 727 01:09:41,790 --> 01:09:48,410 might be the day when we make that decision. So I have a motion it's kind of formal because I think 728 01:09:48,410 --> 01:09:55,190 it's necessary for it to be formal. So I'll read it and of course repeat it if you request. 729 01:09:57,530 --> 01:09:59,590 I would move the number one. 730 01:10:00,000 --> 01:10:07,400 Quality Water Suspending. All of us current efforts in the development of the political, reservoir, and expansion project. 731 01:10:08,820 --> 01:10:14,580 As some later date, maybe perhaps, you know, we've tried this before and we're trying it again. 732 01:10:15,440 --> 01:10:19,860 Maybe climate change, something else. 733 01:10:21,200 --> 01:10:27,660 Be who's us to once again look at this, but I think we suspend this project now today. 734 01:10:27,660 --> 01:10:38,520 Number two, direct the interim CEO to take the necessary steps, including coordination with the California Water Commission, as needed to withdraw. 735 01:10:39,060 --> 01:10:45,640 The value of water's proposition one, water storage investment program application for this project. 736 01:10:46,500 --> 01:10:55,940 Number three, direct the interim CEO to develop a project closure plan, and return to the board and a later date to provide an update, 737 01:10:55,940 --> 01:11:03,160 and seek the Boyd's input as needed on the key project closure elements, including but not limited to 738 01:11:03,160 --> 01:11:10,020 fulfilment of contractual and other obligations, collection of project deliverables and communications, 739 01:11:10,960 --> 01:11:17,280 and notification to applicable regulatory agencies and funding partners of project suspension. 740 01:11:19,370 --> 01:11:22,070 In short, to close out the project. 741 01:11:23,290 --> 01:11:33,930 Number four, direct the interim CEO to take the necessary steps to document and preserve all project records and work product to facilitate development of future projects. 742 01:11:36,170 --> 01:11:50,870 And finally, direct staff to report back to the board at the next few months with a report on what in County storage opportunities we should consider, including our current reservoirs and the permanent inquiry. 743 01:11:51,910 --> 01:12:00,310 That's my motion is extensive, it's essentially like I said, I'm happy to repeat it if any of you would like. 744 01:12:03,300 --> 01:12:12,540 I think that, I think that, you know, as with, so my motion, of course, is based on staff's report up to date, 745 01:12:12,540 --> 01:12:32,880 that, you know, without being able to put CBP water in our own reservoir, come on, and, and of course, you know, that's sure it changes the amount of partners that we would have had because they also would have CBP water and couldn't put in there. 746 01:12:32,880 --> 01:12:36,300 So, that worked as a bird? 747 01:12:36,820 --> 01:12:37,600 Sorry, let me in. 748 01:12:37,620 --> 01:12:38,540 Yeah, thank you. 749 01:12:38,920 --> 01:12:41,260 So, I first of all, I want to thank the chair. 750 01:12:42,260 --> 01:12:43,000 Very much. 751 01:12:43,320 --> 01:12:44,120 You asked me to wait. 752 01:12:44,320 --> 01:12:44,820 And I did. 753 01:12:44,820 --> 01:12:45,180 Okay. 754 01:12:45,500 --> 01:12:46,600 And you were right. 755 01:12:47,240 --> 01:12:48,820 And I fully support this. 756 01:12:49,760 --> 01:12:55,220 And I really want to thank staff for all of the hard work you've done on this. 757 01:12:55,380 --> 01:12:59,680 You know, I know that there has been disagreement among staff. 758 01:12:59,680 --> 01:13:13,680 But I think it's really nice that there are so many team players, you know, to really prioritize the direction, you know, of the agency, which I'm now, please is changing. 759 01:13:15,380 --> 01:13:24,540 I think that is a long time coming, but we don't need to look backwards. We, we can look forward and I'm thrilled for the future. 760 01:13:24,540 --> 01:13:48,340 I mean, I'm sure we're all aware that our storage needs will go down as we ramp up alternative water sources, such as renewable sources such as water recycling and possibly non, non-potable diesel, which is very much a thing. 761 01:13:48,340 --> 01:13:54,320 bringing, using decalination to bring up to putability has been proven really difficult, but 762 01:13:54,320 --> 01:14:01,380 decal to make water possible for agricultural use depending on the crops and the trees and the, 763 01:14:01,520 --> 01:14:07,080 you know, that is, is working. And well, continue to work, same with water recycling. 764 01:14:07,700 --> 01:14:15,300 It'd be great that we now can really push out a full-fledged non-potable recycling program, 765 01:14:15,300 --> 01:14:22,780 like the one that was in my favorite slide ever that I've seen, you know, so far which was a slide 766 01:14:22,780 --> 01:14:28,680 from a presentation given by Ms. Kirsten Strue, who's back there about the potential for 767 01:14:28,680 --> 01:14:35,260 purple tight networks and what we could do to enable, you know, this type of forward thinking 768 01:14:35,260 --> 01:14:41,760 work. You know, it's not a criticism to any of you personally to move on to this new direction. 769 01:14:41,760 --> 01:14:47,400 And I think it's, I think it's, you know, a, you know, I'm pretty deep this way. 770 01:14:47,540 --> 01:14:52,820 I came from the internet industry and tech where changing direction is a weekly occurrence. 771 01:14:53,580 --> 01:14:59,480 You know, this is government and moves to put it, you know, much lesser. 772 01:15:00,000 --> 01:15:11,340 Much lower, you know, so it's, you know, climate change has had greater impact than, you know, anyone really predict 773 01:15:11,340 --> 01:15:18,920 of most people predicted 30 years ago, you know, evaporation rates are really high, 30% in getting 774 01:15:18,920 --> 01:15:24,980 higher. We can't put water in these reservoirs fast enough to make up for the rate it evaporates out. 775 01:15:24,980 --> 01:15:31,260 But fortunately, there's so many smart people here, smart and hard-working, and creative, 776 01:15:32,140 --> 01:15:39,080 and open-minded, and I've been so impressed with the staff that I've delighted to work with. 777 01:15:39,100 --> 01:15:46,300 And I know that, well, move forward so much stronger and creative, and we'll really be indicative 778 01:15:46,300 --> 01:15:54,260 of the Silicon Valley innovative forward thinking water district that we've always had the capacity to be. 779 01:15:54,260 --> 01:16:00,680 I think that, you know, my colleagues who have been on this word a long time will leave with a really great legacy. 780 01:16:02,060 --> 01:16:05,140 And I think that's really important too. 781 01:16:05,880 --> 01:16:09,040 So I just wanted to make sure that all of you have worked so hard in this view. 782 01:16:09,220 --> 01:16:12,600 I said, we still respect you and like you. 783 01:16:12,880 --> 01:16:15,260 And all of that, it's... 784 01:16:16,240 --> 01:16:19,040 When changes need, need it, change should happen. 785 01:16:19,660 --> 01:16:26,900 That's the thing I want to make is that I do think it'd be important to add to the list given by if you're 786 01:16:26,900 --> 01:16:33,500 amenable to this chair. I think it might be also helpful if it's not the outing included to like to do an 787 01:16:33,500 --> 01:16:43,700 investigation into whether any mitigations are necessary for work that was already done, you know, they're having read the court decision 788 01:16:43,700 --> 01:16:51,600 that I discussed earlier, there's some pretty big holes in the earth that I think maybe need to be 789 01:16:51,600 --> 01:17:01,420 filled and you know the areas really close and involves a lot of ancient indigenous sacred relics 790 01:17:01,420 --> 01:17:06,040 that I think we just want to make sure we're working with the tribes or the representatives to 791 01:17:06,040 --> 01:17:11,100 make sure that if they are implicated with their being handled in the right way and really do all 792 01:17:11,100 --> 01:17:15,760 can't leave no trace. If that's, if that's okay with you chair to make sure 793 01:17:15,760 --> 01:17:24,440 they do that. That's why I was trying to be thorough. Yeah, very thorough because the 794 01:17:24,440 --> 01:17:31,880 close out is very important. Yeah. So it mentions all the parties and it's very clear 795 01:17:31,880 --> 01:17:39,420 about going through each, you know, key project closure elements. Great. And the last 796 01:17:39,420 --> 01:18:09,200 Because I have to, is that I think that it's still important to have a financial audit of this, just to, for transparency sake, and it's good democracy, I know that this audit has been pushed back a few times, and I think that, even though the project is no longer going for, you know, for public transparency and accountability, it'd be useful to, you know, to keep our plans going with, with the not it. 797 01:18:09,420 --> 01:18:12,360 Yeah, the audit committee will be coming to us. 798 01:18:12,400 --> 01:18:15,260 I think in October, November to go through the plan. 799 01:18:15,980 --> 01:18:18,420 And we can talk about it then and schedule it, 800 01:18:18,420 --> 01:18:19,460 put it on the plan. 801 01:18:19,880 --> 01:18:22,560 That we coming back towards the either, 802 01:18:22,940 --> 01:18:26,720 either October or November that will look at their, 803 01:18:26,720 --> 01:18:29,800 you know, setting out the plan of what audits 804 01:18:29,800 --> 01:18:32,760 wouldn't conduct for the next year, next calendar year. 805 01:18:32,940 --> 01:18:33,740 Wonderful. Thank you. 806 01:18:33,780 --> 01:18:34,840 Talk about those then. 807 01:18:34,940 --> 01:18:37,440 And again, I think I thank you so much, Chair. 808 01:18:37,440 --> 01:18:45,440 I think it's, it takes courage and integrity to, um, you know, to change force. And I've applied 809 01:18:45,440 --> 01:18:53,340 and respect you for that. Thank you. Vice Chair. Yeah. Thank you, Chair. I really appreciate the 810 01:18:53,340 --> 01:19:00,460 thorough thoughts that you put together here. And I wrote down all five in the other excellent thoughts. 811 01:19:00,840 --> 01:19:06,680 Well, I think staff of course all the hard work. And um, you know, there's a lot of 812 01:19:07,360 --> 01:19:14,420 state must have been made there, of course, are not true and so on. But you know, we get to me is that the director, 813 01:19:15,060 --> 01:19:19,340 nice to you, has said this a couple of years ago, said we're going to get to a certain design. 814 01:19:20,060 --> 01:19:26,980 And she's a former engineer here with over 30 years of experience. So there's nothing new that we're addressing. She said that then. 815 01:19:27,380 --> 01:19:31,680 And the chair at that time supported, which is Tony and myself and we go on and on. 816 01:19:31,680 --> 01:19:34,160 You know, director of a relevant myself, just went through all this. 817 01:19:34,240 --> 01:19:34,880 We're lost in a chaos. 818 01:19:35,080 --> 01:19:40,480 So there's nothing new, and at that time, all the environmental groups, legislators, 819 01:19:40,920 --> 01:19:47,470 assembly people, you know, the commission all gave money, said it was a shoe and now 820 01:19:47,470 --> 01:19:50,590 of a sudden, we sat there and go, what? 821 01:19:50,910 --> 01:19:54,570 And our CEO at the time said eight months ago, it's not going to go through. 822 01:19:55,330 --> 01:19:59,970 Because of cost, regulatory, we go on and on and people just want. 823 01:20:00,000 --> 01:20:07,260 On a suit, but there is not enough dams in California. So don't keep on saying they are, because there's not. 824 01:20:07,960 --> 01:20:15,460 And don't forget the climate change. You spoke, you had your time. And we got firefighting. 825 01:20:15,460 --> 01:20:21,580 Goes on all the time. There's not enough dams, waters, freshness. This prevents floods in the Sahara. 826 01:20:21,960 --> 01:20:25,100 Don't forget your neighbors who drowned a little bit. 827 01:20:25,620 --> 01:20:27,920 And in 2017, if this would have been intact, 828 01:20:28,480 --> 01:20:40,920 We probably didn't have the 2017 flood, but it was built 1939 for something, and future development, economics, we're going to be addressing this, some of us won't be here. 829 01:20:41,100 --> 01:20:50,300 It'll come up again because you're going to have droughts, doubts, economy, and you can't go on without water. 830 01:20:50,300 --> 01:20:53,340 You can make what electricity, but you can't make without water. 831 01:20:53,640 --> 01:20:55,560 So I'll go over this whole thing all over again. 832 01:20:56,000 --> 01:20:59,260 We did a fantastic job. Our staff was fantastic. 833 01:20:59,840 --> 01:21:02,120 Trying to make sure we have water for the future. 834 01:21:03,620 --> 01:21:04,880 Because we have ours. 835 01:21:05,600 --> 01:21:08,800 So I commend everybody and these are always hard decisions. 836 01:21:09,420 --> 01:21:14,300 But guess what? When I'm gone, you're going to come back and you're going to dress it because you have to. 837 01:21:15,440 --> 01:21:17,520 And you can't go build more new dams. 838 01:21:18,020 --> 01:21:22,600 that's the one you're going to have to take care of. It'll come back and it'll benefit everybody. 839 01:21:23,020 --> 01:21:29,180 Flooding climate change. And so on firefighting whatever have you, you know, look at the, 840 01:21:29,180 --> 01:21:37,080 one down on LA when the Dan was dry. And same. That's what they're built for drinking water and the environment. 841 01:21:37,260 --> 01:21:43,400 All the good things. So I can go on and on Tony fantastic job or a staff. Thank you all. 842 01:21:43,400 --> 01:21:48,400 We'll be here again, but I'll be a civilian, but I'll be looking at you in helping you. 843 01:21:49,800 --> 01:21:50,480 Derek, the gorilla. 844 01:21:52,280 --> 01:21:53,320 Thank you, Chair. 845 01:21:54,040 --> 01:22:00,560 So just to read or read with Director Satsau says the way it's speaking, doesn't he? 846 01:22:01,100 --> 01:22:01,760 He just does. 847 01:22:02,440 --> 01:22:03,960 So he talked about fires. 848 01:22:04,980 --> 01:22:07,920 And I recall during the fires in Southern California. 849 01:22:08,200 --> 01:22:12,580 I guess it was a February where the president came to California. 850 01:22:12,580 --> 01:22:19,080 and was looking for that magic spigot that he could turn and release all the water from the 851 01:22:19,080 --> 01:22:23,220 central valley to hit it down to Southern California because there's no water in the reservoirs 852 01:22:23,220 --> 01:22:28,220 there to fight the fires. There's no water in the dams in Southern California to fight the fires. 853 01:22:28,860 --> 01:22:33,520 Now what do we have going on right now in the state of California up and down the state fires? 854 01:22:34,640 --> 01:22:40,560 And no matter how you look at it, water storage is above and beyond the most important element 855 01:22:40,560 --> 01:22:47,380 for firefighting number one and for our water supply for the state of California. 856 01:22:48,340 --> 01:22:54,020 There are close to 500 water agencies, very similar public water agencies, very similar to valley water. 857 01:22:54,320 --> 01:22:55,920 Up and down the state, small meeting in large. 858 01:22:56,740 --> 01:23:02,440 And I'm very fortunate being part of an organization called Aquasosis and California Water Agency. 859 01:23:02,960 --> 01:23:06,680 To meet with these groups on a monthly basis to discuss their needs. 860 01:23:06,680 --> 01:23:12,880 Now, what are their main needs? Water supply, water storage. Each and every single one of these folks 861 01:23:12,880 --> 01:23:18,980 up and down the state are looking to store more water. So, it's a debate. We're going to 862 01:23:18,980 --> 01:23:24,820 end it tonight with the motion on the table for Pacheco, but we're going to continue to find and 863 01:23:24,820 --> 01:23:32,940 store water in Santa Clara County to continue the fight, the fire mission. That's my message. 864 01:23:40,920 --> 01:23:51,940 Okay, so I'll call for the motion now and I've got a second already from like 865 01:23:51,940 --> 01:23:57,120 Derek Eisenberg. Yeah, from Derek Eisenberg. So those were the motions say aye. 866 01:23:57,860 --> 01:24:01,700 Aye. Posting no abstentions passes unanimously. 867 01:24:04,120 --> 01:24:12,840 I want to take a few minutes to thank staff and remind them that there's plenty of work 868 01:24:12,840 --> 01:24:14,100 to be done. 869 01:24:14,620 --> 01:24:20,260 You know, Vice Chair and I had the opportunity to go to New Orleans with the Chamber 870 01:24:20,260 --> 01:24:24,400 on their city visits years ago after Katrina. 871 01:24:24,400 --> 01:24:32,260 And, you know, we found that what happened with Katrina was that the walls that the Army 872 01:24:32,260 --> 01:24:37,480 Corps of Engineers had built, so that the water wouldn't go over, and the water didn't 873 01:24:37,480 --> 01:24:38,300 go over. 874 01:24:38,700 --> 01:24:47,660 They just simply melted, and so the California Department of Events required every dam owner 875 01:24:47,660 --> 01:24:51,740 and California to examine all of their dams. 876 01:24:51,740 --> 01:24:59,840 And we did that. That's why we're working on Anderson as quickly and as hard as we are. And that's why we have a few more. 877 01:25:01,700 --> 01:25:10,120 Times that we have to repair. We've been waiting, working on this slowly, along with some of the other stuff, and project once so on. 878 01:25:10,360 --> 01:25:18,280 So there's plenty of work to be done. And I look forward to having this tremendous staff who have learned so much more. 879 01:25:18,280 --> 01:25:29,520 I have so much more experience that are going to do even better job on our storage facilities, fixing them, upgrading them, maybe expanding them. 880 01:25:29,520 --> 01:25:42,500 And of course, I'd like to see a stick a look at the permanent inquiry as I mentioned because we did look at it before and gently just to see what we could do with the hole in the ground that we wouldn't have did. 881 01:25:43,520 --> 01:25:49,160 And so I'm hoping that staff would take a look at that along with the other storage requirements that we have. 882 01:25:49,480 --> 01:25:55,580 We talked about sites, but you know, let me be clear about sites because a lot of people don't don't understand this. 883 01:25:55,580 --> 01:26:06,220 Sikes is not a traditional storage facility project we are not going to store our water in that facility nor is anybody else 884 01:26:07,180 --> 01:26:14,440 What we are investing in is any new water that might be captured by that facility 885 01:26:15,480 --> 01:26:20,740 But we're not putting any of our water in there. So that's not going to mean our storage requirements 886 01:26:21,540 --> 01:26:22,220 either 887 01:26:22,220 --> 01:26:24,040 That's why it's important 888 01:26:24,620 --> 01:26:31,940 to have our staff move over and get back to looking at the rest of our facility that you 889 01:26:31,940 --> 01:26:38,860 already were doing but quicker and then be more invested in it. So you have plenty of work 890 01:26:38,860 --> 01:26:41,660 to do don't worry and I'm so proud 891 01:26:46,750 --> 01:26:47,230 of 892 01:26:50,780 --> 01:26:53,380 all of the tours that we have. 893 01:26:55,550 --> 01:26:56,400 We take people out 894 01:26:57,840 --> 01:27:04,240 from Sacramento, some of my friends have met and everywhere in the state 895 01:27:06,350 --> 01:27:07,670 to see the kind 896 01:27:07,670 --> 01:27:08,490 work 897 01:27:20,870 --> 01:27:23,290 that you do on a daily basis. 898 01:27:29,550 --> 01:27:30,570 I'm so proud. 899 01:27:32,700 --> 01:27:34,260 Thank you all. 900 01:27:40,710 --> 01:27:46,170 One more right along to item 10, the CEO and Chief reports. 901 01:27:49,230 --> 01:27:53,570 Yes, thank you, Mr. Chair. That's a hard act to follow. I must say. 902 01:27:54,810 --> 01:27:58,390 We have only one report today, and it's from Chief Gibson. 903 01:28:01,750 --> 01:28:03,970 That is a hard act to follow indeed, and I'll do my best. 904 01:28:05,230 --> 01:28:05,930 Good afternoon, Charis. 905 01:28:06,110 --> 01:28:06,850 Madam, I'm just the board. 906 01:28:07,010 --> 01:28:08,190 You have, before you, the monthly one, 907 01:28:08,290 --> 01:28:09,490 Peter from the Office of Communications. 908 01:28:09,930 --> 01:28:11,630 Just a couple of highlights to note. 909 01:28:12,090 --> 01:28:15,930 The summer water conservation campaign launched at the beginning of June to bring awareness to the community 910 01:28:15,930 --> 01:28:17,250 about our rebate programs. 911 01:28:17,750 --> 01:28:21,110 This multilingual effort serves to remind partner agencies to use our materials 912 01:28:21,110 --> 01:28:23,810 to amplify the ongoing message of water conservation 913 01:28:23,810 --> 01:28:33,630 In coordination with HR, staff also launched the 2025 Summer Intern and Social Media Campaign to allow our summer interns to share their internship experience through our social media platforms. 914 01:28:34,630 --> 01:28:39,950 Secondly, the National Association of Flood and Stormwater Management Agency is recognized our 2024-25. 915 01:28:40,570 --> 01:28:43,930 Flood awareness campaign with its second place of word of excellence in communications. 916 01:28:44,450 --> 01:28:51,690 This latest campaign helped increase residents positive rating of value water flood awareness work by a whopping total of 39% since 2017. 917 01:28:51,690 --> 01:28:57,050 and that's based on 57% of residents rating our efforts as excellent or good compared to just 18% 918 01:28:57,050 --> 01:29:00,810 eight years ago. And that concludes my report. Thank you. 919 01:29:03,960 --> 01:29:05,980 That concludes the CEO report, Mr. Chair. 920 01:29:08,790 --> 01:29:15,070 Great. Sure. I mean. Well, right along to 921 01:29:17,090 --> 01:29:18,950 a board policy planning calendar. 922 01:29:19,750 --> 01:29:24,590 Thank you, Chair. I just have a few quick updates to the board policy and planning calendar. The first 923 01:29:24,590 --> 01:29:34,210 As the stream maintenance program and environmental impact report that had a target date for the November board meeting will now be moved to the January board meeting. 924 01:29:34,730 --> 01:29:38,830 And the timing of this item is dependent on many external factors and may change. 925 01:29:39,710 --> 01:29:49,050 The climate change action plan that was adopted in 2021 with final updates will now be provided via non agenda rather than going to a committee. 926 01:29:49,050 --> 01:29:59,710 The draft greenhouse gas reduction plan that was presented to the board policy and monitoring committee in June 2025 will go to the full board in late 2025. 927 01:30:00,000 --> 01:30:07,380 Our early 2026 for plan adoption and seek approval. And finally, an update on legislative proposals and guiding 928 01:30:07,380 --> 01:30:12,060 principles will be going to the full board in November 2025. That's it. 929 01:30:13,020 --> 01:30:16,200 Thank you. So, 930 01:30:18,440 --> 01:30:25,480 Board Member reports and announcements. Let's see, we'll start on this side this time. 931 01:30:25,480 --> 01:30:27,340 to the advertising bird. 932 01:30:28,040 --> 01:30:32,300 Thank you. As usual, I said it in a lot of interesting meetings that I really appreciated. 933 01:30:33,280 --> 01:30:38,380 And also, I listened to pretty much all of the water commission, California Water Commission meeting, 934 01:30:38,940 --> 01:30:42,340 which was very interesting, you know, thanks for the end. 935 01:30:43,880 --> 01:30:51,720 So, and met with a couple constituents about various matters. Oh, and attended a meeting in Palo Alto about the upcoming project, 936 01:30:51,720 --> 01:30:54,540 which was exciting too. 937 01:30:54,660 --> 01:30:59,700 Then I spent a weekend in Wisconsin where I experienced rain. 938 01:31:01,300 --> 01:31:07,140 And I know it's pretty awesome water does come from the sky still in many places. 939 01:31:08,940 --> 01:31:14,820 And that's how agriculture and other plant life is watered there. 940 01:31:15,140 --> 01:31:16,040 So go figure. 941 01:31:16,940 --> 01:31:20,720 But yeah, I really appreciate the work of my colleagues today. 942 01:31:20,720 --> 01:31:26,400 and I'm excited about the future of this organization and board. So thank you. 943 01:31:27,920 --> 01:31:35,210 Thank you. Vice Chair. Thank you, 944 01:31:38,340 --> 01:31:40,280 Chair. We had to deal with the 945 01:31:40,280 --> 01:31:45,700 purification tour with the New Council member Pamela campus. There was excellent 946 01:31:45,700 --> 01:31:49,800 our staff as a great job. We just had a joint meeting with the City of San Jose. 947 01:31:50,280 --> 01:31:53,180 I have to tell you, that's always a really good meeting to the chance to 948 01:31:53,180 --> 01:31:59,880 long dialogue and just chat was really good. Just met with Mark Belsky again about 949 01:31:59,880 --> 01:32:05,580 the agenda for the coming environmental creek cleanup and we can't say enough about 950 01:32:06,640 --> 01:32:12,060 Jennifer and Mark and the job they're doing to minimize all the and how's an increase 951 01:32:12,060 --> 01:32:16,220 trying to make him safe. It's a difficult job and you're busy with the best they can 952 01:32:16,800 --> 01:32:23,130 and we just had the water and the man meeting just a couple days ago. Thank you. 953 01:32:25,850 --> 01:32:38,610 Yeah, so in terms of briefings, I had a briefing from staff on window outreach programs in terms of community stuff. 954 01:32:38,910 --> 01:32:45,750 I give a presentation to the Dean Democratic Club was at the Chamber of Barbecue and we had a really fantastic. 955 01:32:45,750 --> 01:32:51,890 we invited a speaker on the Delta Command's project and the Bay Delta to a rotary, the downtown 956 01:32:51,890 --> 01:32:54,150 center of the rotary, and that was really wonderful. 957 01:32:56,430 --> 01:32:58,350 Met with representative from the Sierra 958 01:32:58,350 --> 01:33:03,750 Club, met with a representative of Microsoft and just to I'll pause on that because I had reached 959 01:33:03,750 --> 01:33:10,810 out to, I was trying to get more information about data centers and the water usage of data centers 960 01:33:10,810 --> 01:33:19,050 in this conversation with Microsoft was so incredibly informative and I really appreciate 961 01:33:19,050 --> 01:33:19,710 that. 962 01:33:20,210 --> 01:33:27,210 And then all of this is in addition to normal committee meetings, the EWRC, the Audit 963 01:33:27,210 --> 01:33:31,330 Committee, the Youth Commission and the Water Supply and the Management Committee. 964 01:33:36,650 --> 01:33:38,470 Thank you, Chair. 965 01:33:38,470 --> 01:33:47,790 Since my last report, I had a briefing meeting on some of your east and west channel project. 966 01:33:48,310 --> 01:33:52,810 They see a P-committee meeting, the special board meeting with the City of San Jose, 967 01:33:53,210 --> 01:33:59,690 Use Commission meeting, Palo Alto full base and tight gauge seismic retrofit project, public meeting 968 01:33:59,690 --> 01:34:03,550 and while the supply demand management committee meeting. 969 01:34:03,550 --> 01:34:04,210 Great. 970 01:34:04,530 --> 01:34:05,130 The right to move on. 971 01:34:06,910 --> 01:34:07,730 Thank you, Chair. 972 01:34:08,110 --> 01:34:08,310 Yeah. 973 01:34:08,410 --> 01:34:13,510 I've had a series of meetings of special board meeting, whether we have the Youth Commission 974 01:34:13,510 --> 01:34:19,570 Meeting, awkward board meeting, monthly meeting with the Executive Director of 975 01:34:19,570 --> 01:34:20,510 Valet of Aqua. 976 01:34:21,190 --> 01:34:24,630 I also attended a very interesting meeting with Well. 977 01:34:25,610 --> 01:34:33,150 Well is water education for Latino leaders expressing a lack of people of color that 978 01:34:33,150 --> 01:34:39,090 serving on major water boards up and down the state of California. And two state legislators, 979 01:34:39,890 --> 01:34:46,430 both female, both Latina were there advocating for more people of color up and down the state 980 01:34:46,430 --> 01:34:52,050 and all our ages. And they gave examples of all the primary agencies in California that are not 981 01:34:52,050 --> 01:34:57,090 being served at all by people of color. It was quite eye-opening. So I was happy to participate in that meeting. 982 01:34:57,090 --> 01:34:58,210 So those are my reports. 983 01:35:00,000 --> 01:35:25,820 Thank you. And I had a number of meetings as usual with the CEO, a general council, CEO, the DCA. Also, our environmental stakeholder, our environmental stakeholder meeting we had. We, as the right times of work have raised at the meeting, the day before actually. 984 01:35:25,820 --> 01:35:41,020 We opened the meeting to everyone and not been done mostly because it was a stakeholder meeting that we only met with invited folks from the environmental community since we already have an environmental advisory committee. 985 01:35:42,460 --> 01:35:49,060 We were handling it that way but of course it will remain open for everyone from now on. 986 01:35:49,060 --> 01:36:00,380 We asked all of the participants as usual to, you know, give us any, any list of any people that we should invite from the environmental community. 987 01:36:01,200 --> 01:36:10,240 And we had a great presentation from Dr. Lyman who, in fact, I will ask to provide that to the board. 988 01:36:10,240 --> 01:36:16,240 Yeah, a great presentation about carbon cleanup that is naturally done by redwoods. 989 01:36:17,020 --> 01:36:31,520 And I thought it's very interesting topic for us to look at and perhaps participate in some way in program that he has in planning redwoods. 990 01:36:31,520 --> 01:36:33,940 And we could do it with a lot of the land that we have. 991 01:36:33,940 --> 01:36:43,360 It's a big contribution to Carbon Cleanup with not very much money. 992 01:36:45,620 --> 01:36:46,320 Also, 993 01:36:50,880 --> 01:36:55,720 a number of the audit committee, the recycle committee, 994 01:36:59,170 --> 01:37:00,530 and that's it. 995 01:37:00,610 --> 01:37:08,170 We have our strategic planning coming up on the 29th, so I'm looking forward to that. 996 01:37:08,170 --> 01:37:26,170 And the meeting with the City of San Jose was a very constructive meeting, very, very, very good constructive meeting, so I think we will continue to work very closely with them on a lot of the issues on housing and some of the other issues that we've been working on. 997 01:37:26,170 --> 01:37:52,910 Of course, with recycling, we hope by the end of this calendar year that we'll have be able to put out RFP for the for the clear water facility. So, so we're moving on right along very quickly with them and they've been very helpful to be able to get get a recycle project moving getting it on a fast track so so we're doing very well with that. 998 01:37:52,910 --> 01:37:58,110 Um, so ask clerk review and clarification the board request. 999 01:37:58,710 --> 01:38:03,430 Oh, just have the request to provide that presentation from Mr. Landman to the entire board. 1000 01:38:03,510 --> 01:38:04,110 I will do that. 1001 01:38:04,350 --> 01:38:06,070 And I wanted to let you know that we have a public comment. 1002 01:38:06,770 --> 01:38:06,890 Gotcha. 1003 01:38:07,030 --> 01:38:08,910 Urban has her case, would you like to? 1004 01:38:11,130 --> 01:38:11,370 Gotcha. 1005 01:38:12,110 --> 01:38:12,570 Good afternoon. 1006 01:38:13,230 --> 01:38:14,710 Hello, again, board. 1007 01:38:14,990 --> 01:38:16,390 Can you hear me better this time? 1008 01:38:16,810 --> 01:38:17,850 Yes, thank you. 1009 01:38:18,250 --> 01:38:22,370 I had my, I just want to repeat one thing for my comment. 1010 01:38:22,370 --> 01:38:30,450 I had my hand raised for the board planning and policy calendar, and what I had said previously 1011 01:38:30,450 --> 01:38:36,590 is I wanted to request that Pateco be added to the board planning and policy calendar so that 1012 01:38:36,590 --> 01:38:41,450 the public can anticipate future discussions regarding the termination of the project, 1013 01:38:42,410 --> 01:38:50,990 and another topic should be added to the calendar about the exploration for new storage enhancement projects. 1014 01:38:52,370 --> 01:38:56,970 and also suggesting that these items should be overseen 1015 01:38:56,970 --> 01:38:59,650 by the water supply and demand management committee. 1016 01:39:01,130 --> 01:39:03,230 So those are my comments for the board planning 1017 01:39:03,230 --> 01:39:04,350 and policy calendar. 1018 01:39:04,810 --> 01:39:08,790 And I did email my full comments to the board 1019 01:39:08,790 --> 01:39:12,110 since apparently we're not able to hear much of what I said 1020 01:39:12,110 --> 01:39:12,750 previously. 1021 01:39:14,790 --> 01:39:17,370 We heard you most important suggestions though. 1022 01:39:19,370 --> 01:39:28,050 And I will, when we, in the next couple of meetings when we raise, when we look at our schedule, 1023 01:39:29,230 --> 01:39:36,110 if by then we have a more sure date when we're going to come back with a report from staff, 1024 01:39:36,570 --> 01:39:40,230 we'll add it to the calendar, so people know when it's coming back. 1025 01:39:40,810 --> 01:39:42,530 So thanks for your suggestions. We'll do that. 1026 01:39:42,690 --> 01:39:46,470 Okay, thank you. Yeah, my suggestions are forward looking so. 1027 01:39:46,470 --> 01:39:49,310 Yes, yes. Thank you. Thanks. 1028 01:39:52,530 --> 01:39:59,210 Okay, so the board will convene for the next special meeting at 9.30 a.m. on Friday, August 29th right here at our headquarters. 1029 01:40:00,000 --> 01:40:03,020 Thank you all for a great meeting and we're adjourned.