1 00:00:58,540 --> 00:01:00,240 Ready when you are? 2 00:01:04,980 --> 00:01:26,080 Good morning, everybody. And welcome. We'll call the meeting to order. Stephanie, roll call, please. Yes. Director Shua. Here. Vice chairperson, Keegan. And chairperson, Santaus. Yes. You have a quorum. Thank you, Stephanie. Time off and report the comment on any item, not on the agenda. Do we have anybody? 3 00:01:29,240 --> 00:01:35,080 So online, there are no hands raised. And I just got a comment. 4 00:01:35,100 --> 00:01:42,160 for item 4.3. Okay. So there are no comments, public comments for this item number two. 5 00:01:42,520 --> 00:01:47,180 If anybody does, this let us know. We're very open here. We'll be glad to accommodate you. 6 00:01:47,980 --> 00:01:49,860 We'll go to approval of minutes. 7 00:01:52,430 --> 00:01:56,750 Motion to approve meeting minutes of June 24, 2024. 8 00:01:57,670 --> 00:02:03,590 Second. There's a second. All of Abraham? Aye. All opposed. That carries. Thank you. 9 00:02:03,590 --> 00:02:09,870 Now, we'll go to the regular agenda, receive information on the Safe Clean Water Conservation 10 00:02:09,870 --> 00:02:15,430 Program, project a two water conservation rebates, and programs. 11 00:02:16,750 --> 00:02:16,950 Christian. 12 00:02:17,150 --> 00:02:18,090 Yeah, good morning, committee. 13 00:02:18,350 --> 00:02:18,810 Here's the service. 14 00:02:19,010 --> 00:02:20,670 It's an officer for the water supply division. 15 00:02:20,870 --> 00:02:22,470 I will turn this over to Ashley Shannon. 16 00:02:24,900 --> 00:02:25,240 Thank you. 17 00:02:26,100 --> 00:02:26,340 Thank you. 18 00:02:27,660 --> 00:02:28,460 Hi, I'm Alex. 19 00:02:28,560 --> 00:02:29,020 Good morning. 20 00:02:29,440 --> 00:02:34,160 I'm Ashley Shannon, Senior Water Conservation Specialist of Valley Waters, Water Supply Planning and Conservation 21 00:02:34,160 --> 00:02:34,620 Unit. 22 00:02:35,640 --> 00:02:39,560 Thank you, Chair Sondos and many for having me here today. 23 00:02:40,020 --> 00:02:45,620 Today I'm going to be providing an update on the Safe Clean Water, the A2 Conservation 24 00:02:45,620 --> 00:02:46,760 Programs and Update. 25 00:02:49,470 --> 00:02:54,570 So through the 2020 voter approved measure S, a Renewal Valley Waters Safe Clean Water 26 00:02:54,570 --> 00:03:00,810 and Natural Flood Protection Program, up to 1 million per year, is for water conservation activities, 27 00:03:01,110 --> 00:03:05,770 including rebates, technical assistance, and public education within the first 28 00:03:05,770 --> 00:03:07,910 seven years of safe clean water. 29 00:03:08,230 --> 00:03:09,090 The water now, 30 00:03:09,350 --> 00:03:11,070 sick clean water funding not only helps 31 00:03:11,070 --> 00:03:13,150 value water meets is countywide long-term 32 00:03:13,150 --> 00:03:16,950 conservation goals of 110,000 acre feet of water 33 00:03:16,950 --> 00:03:19,130 by 2040, which since writing this, 34 00:03:19,210 --> 00:03:20,630 we now have a 2050 poll. 35 00:03:21,030 --> 00:03:23,090 But these water conservation programs also increase 36 00:03:23,090 --> 00:03:27,630 for water supply reliability and reduce greenhouse gases 37 00:03:27,630 --> 00:03:29,930 and irrigation run-off pollution to the bay. 38 00:03:30,830 --> 00:03:32,050 In fiscal year 2024, 39 00:03:32,050 --> 00:03:38,150 Safety and Water Provide and Opportunity to enhance and create our landscape rebate program, 40 00:03:38,510 --> 00:03:44,030 our long-busters program, and our qualified water efficient landscape retraining, which I will go over. 41 00:03:45,810 --> 00:03:51,230 To increase participation in Valley Waters Water Conservation Program, Safety and Water Funding was utilized 42 00:03:51,230 --> 00:03:56,550 to increase our landscape conversion rebate from $1 per square foot to $2. 43 00:03:56,550 --> 00:04:03,690 and was utilized to increase funding payment to local nonprofit RCD Forest for the Lombuster's program, 44 00:04:04,270 --> 00:04:07,710 increasing from $2 per square foot to $4 per square foot. 45 00:04:08,250 --> 00:04:12,370 The Lombuster's program is offered to low-income community members, United States veterans, 46 00:04:12,510 --> 00:04:14,490 and other disadvantaged community members. 47 00:04:14,930 --> 00:04:19,310 And in fiscal year 24 resulted in 23,000 square feet of long conversion, 48 00:04:19,310 --> 00:04:22,130 spread over 23 different projects. 49 00:04:23,130 --> 00:04:29,570 The increased funding for landscape rebate program led to the conversion over 1.4 million square feet of lawn, 50 00:04:29,970 --> 00:04:34,050 1 million of which was eligible for the safety and water funding. 51 00:04:35,310 --> 00:04:42,330 The total square footage of lawn convertant fiscal year was approximately 29% lower than the previous fiscal year, 52 00:04:42,410 --> 00:04:48,430 so lower than 2023. However, it does remain significantly higher than pre-safety water funding, 53 00:04:48,430 --> 00:04:58,370 and nearly 316% higher than fiscal year 2021, which in fiscal year 23 and 24, it's also 54 00:04:58,370 --> 00:04:59,970 notice of notable with our landscape rebate. 55 00:05:00,000 --> 00:05:06,080 Program, that participation from our commercial, industrial, and institutional, which were for 56 00:05:06,080 --> 00:05:13,480 two SCI sectors and multi-family sites, experience a shift. So previously, the CII and multi-family 57 00:05:13,480 --> 00:05:21,000 sites accounted for about 5% of the applications rebated and about 25% of the long conversion 58 00:05:21,000 --> 00:05:28,040 law and square footage converted. However, we saw in fiscal year 23 and 24 that the CII and 59 00:05:28,040 --> 00:05:32,240 multi-family participation grows to about 10% of the applications 60 00:05:32,240 --> 00:05:36,320 rebated and about 43% of the long conversion projects. 61 00:05:36,840 --> 00:05:40,960 So we're seeing more of the larger sites and larger projects within those. 62 00:05:41,260 --> 00:05:44,260 This increase in RCAI and multi-family participation 63 00:05:44,260 --> 00:05:49,480 is likely due to the increase in square footage that was made possible. 64 00:05:49,500 --> 00:05:52,080 I mean, rebate that was made possible by safely water funding 65 00:05:52,080 --> 00:06:00,380 And in 2022, our increase cap for commercial sites to 100,000 from 50,000. 66 00:06:00,600 --> 00:06:05,380 In addition, the ban on irrigation and non-functional turf at these sites adopted both by 67 00:06:05,380 --> 00:06:10,580 Valley Water and at the state level likely increased attributed to the increase and 68 00:06:10,580 --> 00:06:12,180 participation from those sectors. 69 00:06:15,770 --> 00:06:20,530 Our safety and water funding program allowed Valley Water to pilot new programs and 70 00:06:20,530 --> 00:06:26,570 resources for the public to help better conserve water. In fiscal year 24, the enhanced training 71 00:06:26,570 --> 00:06:32,710 for landscape professionals are made possible by safety and water funding, which we was securing 72 00:06:32,710 --> 00:06:39,250 contractor, California water fishing partnership, to administer the EPA water since certified 73 00:06:39,250 --> 00:06:44,710 qualified water efficient landscape for training, often referred to as 12, which is a training 74 00:06:44,710 --> 00:06:49,930 for landscape professionals who live when we offered it with who live and work in Santa Clara County. 75 00:06:50,530 --> 00:06:53,770 The quail training, offered in both Spanish and English, 76 00:06:54,210 --> 00:06:57,210 equipped our local landscapers, contractors, and designers 77 00:06:57,210 --> 00:07:00,090 with tools they need to provide water-ficient landscaping 78 00:07:00,090 --> 00:07:02,650 to our residents in Santa Clara County. 79 00:07:03,370 --> 00:07:06,610 Over the contract, the training provided 165 participants 80 00:07:06,610 --> 00:07:10,890 over five classes with a knowledge and water-ficient landscaping 81 00:07:10,890 --> 00:07:13,370 and practices, including water management 82 00:07:13,370 --> 00:07:16,030 and preserving our valuable resources. 83 00:07:17,090 --> 00:07:20,490 In spring of 2024, we hosted the last training 84 00:07:20,490 --> 00:07:27,650 under the contract in Spanish at Valley Water Facilities with 30 attendees in this cloud in that class. 85 00:07:32,580 --> 00:07:38,500 So for an accepts significant water program funding offered us an opportunity to pilot not just while training, 86 00:07:38,980 --> 00:07:45,860 but also our webinar series landscape summit and permaculture pilot, which was offered in the previous years of safety and water funding. 87 00:07:46,400 --> 00:07:54,280 These pilots were highly successful and as a result, Valley Water is pursuing extensions and expansions of these programs to continue operating 88 00:07:54,280 --> 00:07:58,660 them to the public. So, a value water, we actually just secured a contract to offer the landscape 89 00:07:58,660 --> 00:08:04,940 summit and workshop series as a permanent program, so that will be coming soon. And we'll 90 00:08:04,940 --> 00:08:10,380 be releasing an RFER working on the contract in fiscal year 25 to continue the quail training 91 00:08:10,380 --> 00:08:15,600 into the future. We saw all of these as positive programs with good feedback from the public. 92 00:08:16,560 --> 00:08:21,560 The popular permaculture program that has actually received a value water grant to continue 93 00:08:21,560 --> 00:08:25,680 to offer the program in Spanish, with graduates from our Safety and Water 94 00:08:25,680 --> 00:08:28,220 Funded Pilot helping to teach the new series. 95 00:08:28,740 --> 00:08:33,500 And our long-busters program ended in June of 2024. 96 00:08:34,300 --> 00:08:38,640 And a new contract has been secured to offer enhanced landscape 97 00:08:38,640 --> 00:08:42,160 direct installation program for low-income residents in Santa Clara County. 98 00:08:42,800 --> 00:08:46,560 So this program has been expanded to include 99 00:08:46,560 --> 00:08:51,500 With a gray water laundry landscape systems, rain water capture, irrigation equipment upgrades, 100 00:08:52,260 --> 00:08:56,300 and urban street trade planting, in addition to the long conversions that was offered 101 00:08:56,300 --> 00:08:58,100 under the long-busters program. 102 00:08:59,040 --> 00:09:04,040 This program will be offered to participants of the long-busters wheat list before being 103 00:09:04,040 --> 00:09:05,420 launched to the general public. 104 00:09:07,000 --> 00:09:11,880 In fiscal year 25, as we look forward, safety and water funding will continue to support 105 00:09:11,880 --> 00:09:15,820 the landscape rebate program, allowing for the $2 per square foot conversion rate to 106 00:09:15,820 --> 00:09:20,920 continue. Increased participation in this program will ensure value water reaches our 2040 107 00:09:20,920 --> 00:09:27,000 and now our 2050 goals, water conservation goals. Funny will also be used for the design of 108 00:09:27,000 --> 00:09:32,400 the 26,000 square foot demonstration garden adjacent to value waters headquarters building, 109 00:09:33,120 --> 00:09:37,900 which was presented to this committee in May of 2024, the May 2024 meeting. 110 00:09:38,940 --> 00:09:41,640 And with that, I will open it up for questions. 111 00:09:43,360 --> 00:09:47,260 committee members or a 112 00:09:48,440 --> 00:09:49,160 bruh. 113 00:09:49,160 --> 00:09:51,280 I need to flip back through this. 114 00:09:53,120 --> 00:09:55,420 Well, I think I think that's 115 00:09:55,420 --> 00:09:57,340 great news that we're seeing more 116 00:09:57,340 --> 00:09:58,700 multi-family participation. 117 00:10:00,000 --> 00:10:17,120 I hear a lot from people who live in multi-family housing and if they don't have that conversion, they're very irritated by the fact that some people are just very cablier about water use and there's no impacts to them. So I think it's really nice that that message is getting out. 118 00:10:17,120 --> 00:10:23,240 The qualified water efficient landscape retraining, again, another success story, 119 00:10:25,320 --> 00:10:26,200 I think it's great. 120 00:10:27,340 --> 00:10:39,130 One question I have, like, is there, there's a benefit to the people that participate and that they get the training and that they're able to learn this stuff. 121 00:10:39,130 --> 00:10:45,570 Um, do we do anything sort of to help those folks with their opinion, like, I don't know, 122 00:10:45,730 --> 00:10:51,470 they could have stickers that they could put on their trucks to say they've gone through 123 00:10:51,470 --> 00:10:57,430 this training, um, another thing might be, uh, and I don't know if this, you know, gets 124 00:10:58,470 --> 00:11:00,150 into, um, a category. 125 00:11:00,430 --> 00:11:05,550 I mean, normally we don't like to call out people, but we could have listening to say these 126 00:11:05,550 --> 00:11:08,010 on these people have gone through this training. 127 00:11:08,470 --> 00:11:12,570 So I really think that to expand the program, 128 00:11:12,750 --> 00:11:15,030 we want to show that there's a really direct benefit 129 00:11:15,030 --> 00:11:15,870 to those folks. 130 00:11:16,390 --> 00:11:19,470 So if we have done that, great, if we haven't, 131 00:11:19,670 --> 00:11:22,650 or thinking about it, I think that's 132 00:11:22,650 --> 00:11:24,270 would be a cool thing to do. 133 00:11:24,790 --> 00:11:26,190 Yeah, I think that's a great, 134 00:11:26,230 --> 00:11:28,230 because we do really want to promote these folks. 135 00:11:28,850 --> 00:11:32,070 So the Qual Training Program is an EPI program 136 00:11:32,070 --> 00:11:33,470 that's nationally recognized. 137 00:11:33,470 --> 00:11:38,450 and they have a database where people from the public can go in and search for 138 00:11:38,450 --> 00:11:44,270 their zip code and find a qualified landscaper in that area. We have a list of 139 00:11:45,450 --> 00:11:50,510 landscapers who are on our landscape design assistance program list and on our 140 00:11:50,510 --> 00:11:55,050 landscape professionals list that we can list their qualifications and one of those qualifications 141 00:11:55,050 --> 00:12:01,690 can be the 12 program. But I do think that's a great idea. It's probably more that we can do to 142 00:12:01,690 --> 00:12:05,810 as well. Great. I mean, I think we're, don't give me wrong. I think we're doing great work. 143 00:12:06,090 --> 00:12:11,670 And I just always want to think, how do we reward our behavior, right? How do we make people want 144 00:12:11,670 --> 00:12:15,950 to participate? And how do we draw the attention of the public? Like, oh, you know, here's, 145 00:12:16,110 --> 00:12:21,490 here's someone that has the training to be able to help me save water. And then in terms of the next 146 00:12:21,490 --> 00:12:29,030 steps, delighted to hear the landscape summit is going to be permanent. And I wasn't quite sure about the 147 00:12:29,030 --> 00:12:33,250 landscape, direct installation program, you said that we had partnered with 148 00:12:33,250 --> 00:12:38,630 long busters and that has expired and then there's a replacement, but I 149 00:12:38,630 --> 00:12:44,410 wasn't sure what the replacement was. Yeah, and this is probably recent, but 150 00:12:44,410 --> 00:12:49,530 the contract has been, we went out to bid, we did, we released an RFP and the 151 00:12:49,530 --> 00:12:58,150 bid was awarded to smart yards co-op to run that program for us as a 152 00:12:58,150 --> 00:13:05,150 contractors to now implement that program. It does have more elements to it. 153 00:13:06,590 --> 00:13:09,270 So yeah, our contract with our city forest was set to expire. 154 00:13:10,130 --> 00:13:15,130 And in the end of fiscal year 24, so our next set was to go out to bid for that one. 155 00:13:15,790 --> 00:13:22,630 And you said we went out to bid was that a qualification space selection process or was it low cost. 156 00:13:25,870 --> 00:13:34,950 Thank you, and I just want to say great work. It's always wonderful. So here are the positive progress that we're making. So thank you very much. 157 00:13:34,990 --> 00:13:35,430 No. 158 00:13:38,070 --> 00:13:42,490 I had a chance to encourage you to know, now you're both on the landscape and committee. 159 00:13:43,730 --> 00:13:46,730 And I got to see the little shannas at the giant game. 160 00:13:46,770 --> 00:13:47,290 Oh, yes. 161 00:13:47,290 --> 00:13:50,970 Yep, that was a good event. 162 00:13:51,870 --> 00:13:53,610 How about when it comes to the language, 163 00:13:53,890 --> 00:13:58,450 we have Spanish, and we have the chart, 164 00:13:58,610 --> 00:14:00,130 what else do we have there? 165 00:14:01,590 --> 00:14:04,470 For the call training, we had it in Spanish and English. 166 00:14:04,710 --> 00:14:06,070 We have it, yeah, and he's also. 167 00:14:06,470 --> 00:14:10,030 We don't, I think currently because it's a national program, 168 00:14:10,070 --> 00:14:12,330 it has only been translated into Spanish, 169 00:14:12,610 --> 00:14:16,630 at this point, but I'm not positive of the plans 170 00:14:16,630 --> 00:14:18,610 to translate it into additional languages, 171 00:14:18,610 --> 00:14:27,390 But I know it's it kind of has to be changed at that EPA level, but you know see if there's a need because 172 00:15:00,000 --> 00:15:08,360 And these are the community. Also, mail pages increase in all the time. And is all cities 173 00:15:09,240 --> 00:15:15,340 partners with us on a rebates example, like, you know, mail pages, certain are they all with us? And if 174 00:15:15,340 --> 00:15:22,020 not why not, how can we go about it? Yeah, currently five of the different cities or water retellers 175 00:15:22,020 --> 00:15:28,800 are partnered with us. So we have a city for the Lansing Group, a program specifically city 176 00:15:28,800 --> 00:15:32,600 Palo Alto, Susana Clara, Seidma Pides, 177 00:15:32,900 --> 00:15:36,800 San Jose Municipal Water, and City of Morgan Hill. 178 00:15:37,900 --> 00:15:38,980 Is that five? 179 00:15:40,140 --> 00:15:42,560 And then actually we just got City of Gilroy this year. 180 00:15:43,380 --> 00:15:43,720 Oh yeah. 181 00:15:44,680 --> 00:15:45,540 Which one? 182 00:15:45,540 --> 00:15:46,140 City of Gilroy. 183 00:15:46,440 --> 00:15:46,780 Oh great. 184 00:15:47,540 --> 00:15:49,360 They've come to our landscape and meet again. 185 00:15:49,700 --> 00:15:49,840 Great. 186 00:15:50,240 --> 00:15:53,760 How do we do more outreach or is it? 187 00:15:53,760 --> 00:15:54,520 But you're cutting it. 188 00:15:54,580 --> 00:15:54,980 What's the issue? 189 00:15:54,980 --> 00:16:17,660 Do you know typically it is a challenge of two things so either it's a challenge of funding or in the sense of do they have the funding to participate in the cost share and then there are the other challenges sometimes they're legal says whether or not they could actually do cost shares for this particular program so that's the other hurdle that we have to go through. 190 00:16:18,440 --> 00:16:31,780 Yeah, because of the day we just made a presentation at the milk. It was rotary and a young gentleman there had a good question. He said in Indian, they allowed the roof water come down to go to the ground. 191 00:16:31,960 --> 00:16:35,900 How we looked into that about getting any kind of rebate or recognition. 192 00:16:36,560 --> 00:16:47,640 Yeah, so we actually we do we do have rainwater capture components to our landscape rebate program. So one of them is rain gardens, which essentially tries to keep as much roof water on site and sink that into. 193 00:16:47,640 --> 00:16:52,020 the soil and then we also have rain barrels and systems as part of the 194 00:16:52,020 --> 00:16:55,480 rainy day as well. But do we have the actual gutter to go straight into the earth? 195 00:16:57,740 --> 00:17:02,100 Construction wise, yes. You know, it is different in different sites, but yes, some of them 196 00:17:02,100 --> 00:17:05,700 will redirect into earth and have kind of a friend strain system that, you know, 197 00:17:05,800 --> 00:17:09,220 drains out into the landscape. And so you do see a lot of those kind of go 198 00:17:09,220 --> 00:17:12,020 straight. It depends on site for site. I don't think those are requirements. 199 00:17:12,300 --> 00:17:15,660 Come up in a new idea. They just come to you if they have the planning or whatever 200 00:17:15,660 --> 00:17:18,860 I mean, you guys think it's okay, and they would get a rebate. 201 00:17:19,980 --> 00:17:22,700 I'm sorry, say, say, say, they would possibly get a rebate. 202 00:17:24,060 --> 00:17:27,520 Yeah, I mean, it needs to fit within the, you know, kind of, 203 00:17:27,520 --> 00:17:29,580 respecified requirements of our program. 204 00:17:30,060 --> 00:17:35,260 So like the, probably closest to that is the rain garden. 205 00:17:35,380 --> 00:17:39,740 It's the same concept where really it's taking that down spout and it's redirecting it 206 00:17:39,740 --> 00:17:47,900 that goes underground or not into kind of a shallow excavated area or underground where it does kind of 207 00:17:47,900 --> 00:17:54,020 hold that on site and just sink in the soil. So it's a bio-swell of sorts. But it is the redirect of 208 00:17:54,020 --> 00:17:58,760 the downspot. I said, you know, I'm really not sure, but I said bring your right 209 00:17:58,760 --> 00:18:03,360 days and again, your number and so on. As always, you know, great, you know, it was up at the 210 00:18:03,360 --> 00:18:09,420 bar golf course Brian got any comments beautiful beautiful golf course up there 211 00:18:09,420 --> 00:18:14,280 at the chance to go to a charity event. What's that? 212 00:18:17,820 --> 00:18:19,420 Yeah, great. 213 00:18:23,840 --> 00:18:26,180 Great job. Any public comments? 214 00:18:27,380 --> 00:18:32,620 Definitely anybody? Looks like online there are none and I have no cards. 215 00:18:33,180 --> 00:18:37,540 All right, thank you. Thank you, it was always. 216 00:18:40,670 --> 00:18:42,250 And we're looking forward to that summit. 217 00:18:42,470 --> 00:18:44,250 It's an usually February, right? 218 00:18:44,650 --> 00:18:49,050 End of February, what are 28th and what are we having in 27th? 219 00:18:50,720 --> 00:19:02,820 Because of the date hasn't been set for it, but we just started the, we actually, maybe just a couple of weeks ago got that contract signed off and so we've been meeting with the contractor and we'll be the next thing we'll be to set a date for that. 220 00:19:02,900 --> 00:19:08,720 I've been with you ever since I've been here in every year, it just gets better and better and please get spacked. 221 00:19:09,180 --> 00:19:17,980 Yeah. Okay. Let's go to 4.2. Receive update on BF6DEM, Raise and Reservoir Expansion. 222 00:19:18,660 --> 00:19:20,980 Good morning, Chair, Central, Vince Jen, Deputy for Warfare. 223 00:19:20,980 --> 00:19:22,480 Our favorite driver, hi, Dana. 224 00:19:23,320 --> 00:19:23,740 How are you doing? 225 00:19:27,450 --> 00:19:29,530 Dana Jacobson will be prime to meeting update. 226 00:19:31,330 --> 00:19:32,610 Okay. Great. Thanks, Vince. 227 00:19:33,750 --> 00:19:37,570 Again, I'm Dana Jacobson, Senior Water Resources Specialist and the Import of Water Unit. 228 00:19:37,570 --> 00:19:41,950 Now, we also have Chuck Gardner, the president of the Hallmark Group, participating remotely. 229 00:19:42,330 --> 00:19:46,210 He's serving as the project manager for the Water Authority and will be available for questions. 230 00:19:47,250 --> 00:19:51,030 Today, I'll be providing an update on the BS system raise and reservoir expansion project, 231 00:19:51,370 --> 00:19:55,590 which is a partnership between the San Luis Delta Mendoza Water Authority and the Bureau of Reclamation. 232 00:19:56,710 --> 00:19:58,570 Let's spend several months since our last update. 233 00:19:59,810 --> 00:19:59,970 So... 234 00:20:00,000 --> 00:20:10,160 Next steps. This is just an informational item for you today, but we do expect to bring a recommendation to this committee, and ultimately to the board later this fall or winter. 235 00:20:12,880 --> 00:20:28,020 As you know, a system creates San Luis Reservoir, which is the nation's largest Austrian Reservoir, this facility is critically important for value water, as both our state and federal supplies are stored there, and we have direct access to these water supplies through facilities that we operate ourselves. 236 00:20:28,020 --> 00:20:37,760 The dam raised project simply involves raising the existing dam by an additional 10 feet and expanding the storage of San Luis Reservoir by 130,000 acre feet. 237 00:20:38,080 --> 00:20:45,120 This project would occur concurrently with a separate project that's meant to address seismic safety concerns that the existing dam. 238 00:20:45,740 --> 00:20:55,080 The dam safety project began way back in 2022 and is well underway and it's important to realize that this is driving the schedule for the dam raised project as well. 239 00:20:55,080 --> 00:21:02,900 So, we need to keep pace with that underlying project to realize the cost and schedule efficiencies of doing both projects at the same time. 240 00:21:05,470 --> 00:21:12,230 The project is eligible for up to 50% of costs for funding from the Federal Win Act. 241 00:21:12,550 --> 00:21:16,130 However, a reclamation intends to limit its participation to 30%. 242 00:21:16,890 --> 00:21:25,210 This 30% represents about 39,000 acre-feet of storage capacity that would be managed by the Bureau of Reclamation for CVP purposes. 243 00:21:25,210 --> 00:21:32,490 The remaining 70% or 91,000 acre feet would be managed by the water authority on behalf of the project participants. 244 00:21:33,390 --> 00:21:41,230 Now we think that this is a reasonable approach because it makes more space available for project participants and it simplifies the cost allocation approach. 245 00:21:43,930 --> 00:21:55,190 The back in June of 2023 value waters forward approved approximately $1.6 million in funding for the planning phase of the project and reserve up to 60,000 acre feet of storage capacity. 246 00:21:55,190 --> 00:22:01,170 in the project. This is equivalent to about 66 percent of all the capacity that's allocated to 247 00:22:01,170 --> 00:22:05,850 the project participants. At this time, there was a shortfall in storage requests of about 248 00:22:05,850 --> 00:22:10,970 6000 acre feet, but since this time, the Wesleyan's water district has stepped up to fill the 249 00:22:10,970 --> 00:22:18,030 void and that project is now fully subscribed. But we do expect that these percentages could shift 250 00:22:18,030 --> 00:22:20,810 a little bit when it comes time for the next cash call. 251 00:22:24,120 --> 00:22:25,460 But the bulk of our time over the last 252 00:22:25,460 --> 00:22:30,220 months has been spent on negotiations for a cost share and management agreement, this agreement 253 00:22:30,220 --> 00:22:34,440 is critically important because it'll define how the costs and benefits are shared between 254 00:22:34,440 --> 00:22:39,420 the Bureau of Reclamation and the project participants. The negotiations have been a little 255 00:22:39,420 --> 00:22:43,220 bit more difficult than we anticipated, but at this point we think the agreement is in a really 256 00:22:43,220 --> 00:22:48,820 good place and should be completed in the next month or so. The current thinking is that 257 00:22:48,820 --> 00:22:52,760 Reclamation and the water authority would share construction responsibilities for the 258 00:22:52,760 --> 00:22:57,120 information being responsible for the construction of the dam raised and the water 259 00:22:57,120 --> 00:23:02,960 authority or perhaps even cow trans managing the construction of state route 152, but 260 00:23:02,960 --> 00:23:08,190 this hasn't been finally decided yet. When the project is complete, 261 00:23:08,630 --> 00:23:12,910 the reclamation would retain ownership of the facility as a federal asset and the 262 00:23:12,910 --> 00:23:17,110 participants would be provided a contractual right to storage to be managed through the water 263 00:23:17,110 --> 00:23:21,330 authority. This is a similar arrangement to Valley Water's water service contract, 264 00:23:21,330 --> 00:23:27,370 But instead of water supply, we would be contracting for storage instead, but we would not own the underlying facility. 265 00:23:29,840 --> 00:23:32,940 Additionally, the per- oops, let's see. 266 00:23:33,880 --> 00:23:35,640 Okay, so now move on to the project benefits. 267 00:23:36,840 --> 00:23:41,520 The participants would be given access to storage capacity and relative to the proportion to their investments. 268 00:23:42,240 --> 00:23:48,300 In that space, they could store any water that's available to us for value water that includes both our state and federal supplies, 269 00:23:49,360 --> 00:23:50,860 and a supplemental water transfers. 270 00:23:52,260 --> 00:23:57,380 The agreement also provides for the allocation and storage of surplus CVP water that wouldn't 271 00:23:57,380 --> 00:24:00,200 be available to us absent investment in this project. 272 00:24:01,300 --> 00:24:05,900 And we'll also be able to store surplus state water project butter in this space as well. 273 00:24:06,200 --> 00:24:10,040 We really take advantage of those opportunities now because of a lack of storage capability. 274 00:24:11,540 --> 00:24:15,980 An additional benefit would be that we would have the option to lease or market our 275 00:24:15,980 --> 00:24:18,300 share of capacity to offset project costs. 276 00:24:18,300 --> 00:24:19,260 So 277 00:24:21,860 --> 00:24:25,480 while we're really excited about this project, it's not completely without risk. 278 00:24:26,360 --> 00:24:33,700 One of the more difficult issues to resolve through the negotiations is the security of a water stored on our behalf. 279 00:24:34,440 --> 00:24:37,380 We expect that different water types will have different levels of protections. 280 00:24:38,560 --> 00:24:49,500 For example, throughout the negotiations, reclamation has been adamant that there are certain limited search situations where they may need to use or access our stored central valid project supplies. 281 00:24:49,500 --> 00:24:55,460 Now, this is would likely only occur in a severe or multi-year drought, but it is a risk. 282 00:24:56,460 --> 00:24:59,980 However, we do expect that our state water project supplies would have a much higher... 283 00:25:00,000 --> 00:25:08,960 Attach to the remain agreement as an exhibit. These individual agreements are described in a little bit more detail on the memos, but I won't go into them now. 284 00:25:09,460 --> 00:25:18,080 But please be aware, the value water will not be a party to any of these agreements, and instead will continue to participate in the project through an activity agreement with the water authority. 285 00:25:19,060 --> 00:25:27,100 But we do expect that approval by value waters board will be needed before the water authority approves and executes the cost share agreement. 286 00:25:29,340 --> 00:25:36,360 A total of about $24 million is needed to, from the project participants to complete the planning and design phase of the project. 287 00:25:36,980 --> 00:25:45,080 And initial $3.5 million will be requested in late 2024, concurrent with approval of the cost share and management agreement. 288 00:25:45,820 --> 00:25:55,380 And a more substantial commitment of about $20 million will be needed in early 2026 with final instruction funding needed in early 2028. 289 00:25:57,460 --> 00:26:04,860 And moving on to next steps here, as I stated before, we're just wrapping up negotiations on the cost share and management agreement. 290 00:26:06,100 --> 00:26:17,600 We'll bring this back to the committee for a recommendation later this fall and that'll be paired with an additional, an additional funding request and likely revisions to the activity agreement with a water authority. 291 00:26:18,160 --> 00:26:27,300 If that's approved, we'll move on to negotiations for the subsequent agreements and then we'll start to explore financing options and governance structures. 292 00:26:29,670 --> 00:26:33,150 And that concludes my presentation and I'm about to take any questions. 293 00:26:33,570 --> 00:26:34,010 Thank you, Dana. 294 00:26:34,170 --> 00:26:38,970 Before I go on, I didn't get a chance to introduce John Tank and San Jose Water Company. 295 00:26:39,350 --> 00:26:40,050 John's thanks for coming. 296 00:26:41,750 --> 00:26:46,410 And the reason I'm surprised, because I wasn't a phone with him today, but some other stuff. 297 00:26:46,750 --> 00:26:50,970 But just recently, he had a constituent out there that really had some problems with San Jose Water Company. 298 00:26:50,970 --> 00:26:57,870 And John Representative, the company, could have easily been hard to know is what I mean. 299 00:26:58,210 --> 00:27:03,410 I want to say again, thank you, that constituents called me back and said what a wonderful job you did, 300 00:27:03,610 --> 00:27:07,790 even though you had a disagreement, that you represented both of them well. 301 00:27:07,950 --> 00:27:09,350 Thank you. 302 00:27:09,510 --> 00:27:10,450 Any questions on the committee? 303 00:27:12,010 --> 00:27:12,550 Where were we going? 304 00:27:12,550 --> 00:27:19,050 They apologize for all the questions, but I wasn't on the previous committee about 305 00:27:19,050 --> 00:27:30,470 storage. So some of this stuff is a little new to me. So we referenced both in the memo and in the presentation. 306 00:27:31,610 --> 00:27:36,730 There were a lot of modifications of state route 152, but we're not explicit about those. 307 00:27:36,910 --> 00:27:41,490 I'm assuming it's to facilitate the instruction access. 308 00:27:41,490 --> 00:27:44,650 it's going to be needed or not. I don't know what it is. 309 00:27:44,650 --> 00:27:47,670 Yeah, what that is is it's actually a really big deal. 310 00:27:47,950 --> 00:27:50,750 It accounts for about half of the project costs. 311 00:27:51,090 --> 00:27:53,710 And because of the increase in the storage level and the reservoir, 312 00:27:53,930 --> 00:27:56,630 they're going to need to raise about 10 or 11 feet. 313 00:27:56,850 --> 00:27:59,890 That little section on the east side, 314 00:28:00,030 --> 00:28:01,750 where it goes around the bend down the hands down 315 00:28:01,750 --> 00:28:05,770 and to lock those bones there, they need to raise the elevation of the road. 316 00:28:06,030 --> 00:28:08,010 Yes, I've driven you in there. 317 00:28:08,070 --> 00:28:09,810 So now it's all making sense to me. 318 00:28:09,810 --> 00:28:16,890 I mean, well, I understand they'd have a lot of construction traffic, but to, okay, so it's really about the fact we're doing a little bit. 319 00:28:16,890 --> 00:28:17,130 One thing. 320 00:28:19,030 --> 00:28:22,270 And a couple more things. 321 00:28:24,190 --> 00:28:38,110 So, if we look at page 2 of 11 in the presentation, and this visual is great, by the way, so existing dam, the dam safety rays, the water supply rays, and. 322 00:28:39,490 --> 00:28:47,010 So we say the seismic repair project is already underway, like what level? 323 00:28:48,850 --> 00:28:50,470 Yeah, there are three contracts. 324 00:28:50,590 --> 00:28:53,950 Reclamation is going to let three contracts for that project. 325 00:28:54,570 --> 00:28:59,550 I believe we're there at now as they're working on the design for the third phase. 326 00:29:00,430 --> 00:29:05,830 Or actually the second phase is underway and they need to incorporate the design for the 327 00:29:05,830 --> 00:29:12,370 into the third phase of the damn safety project. And so that we expect that to happen kind of an early 2020 328 00:29:13,810 --> 00:29:20,080 five. So are you saying phase two is under construction? I believe so. I think so. 329 00:30:00,000 --> 00:30:22,340 But, you know, we had our experience with Anderson where we ran into conditions that we didn't expect. And so seismic repairs can always be challenging. And then we have to coordinate it with our project. So I'm sure that staff is aware of all of that and we'll be keeping an eye on it. And we're a big partner. 330 00:30:22,340 --> 00:30:27,280 let me go back. We must be because trust you, or tell me go buy and everybody's written up there. 331 00:30:30,560 --> 00:30:35,500 Yes, and actually, if you would check Cardano? He may know, yeah. 332 00:30:35,700 --> 00:30:39,260 So let's, we'll try to phone a friend real quick and see if check Cardano is. They're either in the 333 00:30:39,260 --> 00:30:43,600 first or the second contract, so you can see when we drive by, they're right now that they are 334 00:30:43,600 --> 00:30:47,720 developing, they're doing creating access roadways and working on various things up there. 335 00:30:48,740 --> 00:30:54,240 With the key part of what Dana was talking about is they're currently designing or finishing 336 00:30:54,240 --> 00:30:58,280 up the design for that third phase and that's where we really need to make sure that we can keep 337 00:30:58,280 --> 00:31:02,540 this risk raised part because we have to piggyback and make sure that before they move forward 338 00:31:02,540 --> 00:31:09,000 with that third phase that all the commitments and everything is ready for the system raised to go 339 00:31:09,900 --> 00:31:14,860 through is Chuck online, maybe you can answer it. Through the chair Chuck is not on the 340 00:31:14,860 --> 00:31:16,420 There they are. Charles Garden. 341 00:31:20,780 --> 00:31:27,000 Can you hear me? Yes. Right. They're going the second contract right now. 342 00:31:27,220 --> 00:31:34,080 And so the first phase and second phase is just the over excavation of the foot of the dam. 343 00:31:34,860 --> 00:31:39,740 So they're trying to get there's I don't know the exact type of soil condition that they're trying to get to. 344 00:31:39,900 --> 00:31:46,560 But they're trying to excavate to more solid foundation material. And so that's a lot of what you've seen so far. 345 00:31:46,560 --> 00:31:56,860 And then they're starting to refill the over excavation with more stable material as they start to prepare for the crest or the dam safety rays. 346 00:31:56,960 --> 00:32:03,420 Excuse me. That third contract they're expecting to release as Dana was saying. 347 00:32:03,420 --> 00:32:09,740 Sometime it's moving around a bit. It was spring. I think it's moving more towards summer. 348 00:32:10,760 --> 00:32:18,240 A lot of the work they're doing also is just looking at suitable soils around the dam area 349 00:32:18,240 --> 00:32:24,260 for the crust rays and for the safety of dam rays and also for the Highway 152 rays. 350 00:32:24,860 --> 00:32:30,800 So there's a good bit of geotech investigation that's going on and was noted there is a 351 00:32:30,800 --> 00:32:37,800 a fault that runs through the reservoir, and so that's the reason for the safety of 352 00:32:37,800 --> 00:32:38,500 dams project. 353 00:32:38,720 --> 00:32:44,100 There's been a lot of analysis that says that during a significant seismic event, the 354 00:32:44,100 --> 00:32:50,980 dam would sunk some 10 to 12 feet, which may allow for overtopping if the reservoir 355 00:32:50,980 --> 00:33:00,780 happened to be full at the time of that seismic event, and so that's the reason for the 356 00:33:00,780 --> 00:33:07,160 to get some economy in scale, it makes sense to do the crest rays concurrent with the safety 357 00:33:07,160 --> 00:33:07,920 of dams rays. 358 00:33:08,080 --> 00:33:14,180 And so as Dana was saying, our challenge is to make sure we're that safety of dams 359 00:33:14,180 --> 00:33:20,360 projects starts to move into this contract free that the crest rays is also approved and 360 00:33:20,360 --> 00:33:23,340 ready to move forward concurrent with that project. 361 00:33:24,720 --> 00:33:43,720 Thank you for that very thorough response and my, my supposition that this is very intricate and we have a lot of moving parts that need to work together is a reality and thank you for both agencies working closely together. I appreciate that. 362 00:33:43,720 --> 00:33:54,480 Under participant benefits, this is page 611, we talk about the third bullet, non-central 363 00:33:54,480 --> 00:33:58,680 valley project water and other water types expected to have a high level of protection. 364 00:33:59,160 --> 00:34:01,420 I didn't understand what we meant by that sentence. 365 00:34:02,740 --> 00:34:07,280 Yeah, so this is been difficult to negotiate with the Bureau of Reclamation, right? 366 00:34:07,340 --> 00:34:10,720 So we're building a construction project here to store our water, right? 367 00:34:10,720 --> 00:34:13,340 So we expect that water to be there when we need it. 368 00:34:14,220 --> 00:34:22,420 And so the arrangement that's being negotiated would give different levels of protection to different water types. 369 00:34:23,140 --> 00:34:27,520 I don't know if we want to get into it too much now or wait until the negotiations are done. 370 00:34:29,880 --> 00:34:35,100 But there's an issue related to reclamation water rights that they kind of won't give up on. 371 00:34:35,600 --> 00:34:38,960 They think that they have risk related to their water rights. 372 00:34:38,960 --> 00:34:46,400 if there's CBP water located in the reservoir when they need that water to meet higher priority 373 00:34:46,400 --> 00:34:51,340 statutory or contractual obligations or to protect public health and safety. 374 00:34:52,020 --> 00:34:55,160 And so there are limited circumstances in the worst of worst years where a 375 00:34:55,160 --> 00:34:59,400 information may need to access or take that water. 376 00:35:00,000 --> 00:35:24,940 So it sounds like this is a very complicated issue that could justify a presentation all of its own at some point. Yes. Thank you. It's it's it's it's not an easy question to answer to there. And lastly, we we don't define what our costs per acre foot would be with this project. Is there a reason for that? 377 00:35:24,940 --> 00:35:28,760 We've had it in previous presentations, and I think it's been part of the water supply 378 00:35:28,760 --> 00:35:33,820 master plan as well. In this presentation, we didn't focus on it as far as construction 379 00:35:33,820 --> 00:35:39,660 cost per acre foot. I think it's about $7,600 per acre feet. But as far as water supply, 380 00:35:39,860 --> 00:35:46,920 I don't think that we have that number. It's, yeah, I would just add that the number 381 00:35:46,920 --> 00:35:53,500 has been provided as part of the water master plan analysis where it's compared in a manner 382 00:35:53,500 --> 00:35:56,600 consistent with the way it's calculated for other projects. 383 00:35:57,320 --> 00:36:00,860 Fortunately, I don't have that number of the top of my head. 384 00:36:01,960 --> 00:36:04,540 I apologize for asking so many questions, but I haven't. 385 00:36:04,780 --> 00:36:05,260 No problem. 386 00:36:06,200 --> 00:36:07,800 It's been presented several times. 387 00:36:07,960 --> 00:36:08,700 It hasn't changed. 388 00:36:09,360 --> 00:36:09,820 All right. 389 00:36:10,200 --> 00:36:10,980 Thank you very much. 390 00:36:11,200 --> 00:36:11,500 That's it. 391 00:36:11,520 --> 00:36:12,680 Thanks so much. 392 00:36:12,980 --> 00:36:13,320 All right. 393 00:36:14,920 --> 00:36:16,880 Any, how do you up there, definitely? 394 00:36:18,280 --> 00:36:19,220 Thank you, Chair. 395 00:36:19,640 --> 00:36:22,520 There are no hands raised online and I have no cards. 396 00:36:22,520 --> 00:36:27,720 anybody else in the building? No. Thank you, data. All right. Thank you. 397 00:36:33,220 --> 00:36:37,140 Go to a 4.3 receive information update on the unique. 398 00:36:37,380 --> 00:36:41,260 Requirements was a Pacheca reservoir expansion project. 399 00:36:44,920 --> 00:36:51,120 And by the way, Ryan just got through making a presentation at the Santa Clara County Emergency Operations Council 400 00:36:51,900 --> 00:36:55,040 and excellent four star job as usual. 401 00:36:55,820 --> 00:37:03,500 Thank you, Chair. Good morning, committee. I'm Ryan McCarty. I'm deputy operating officer at the dam safety and capital delivery division. 402 00:37:04,500 --> 00:37:18,020 So, given an update today on the Shaco Reservoir Expansion Project, this is the next presentation in our series of presentations focusing today on the unique requirements and some of the unique benefits associated with them. 403 00:37:18,020 --> 00:37:24,140 So we'll go through the presentation, and then we can take questions at the end, or if there's something you want to stop me on, just to just follow. 404 00:37:26,020 --> 00:37:37,980 Okay, I don't want to spend too much time on the operations and the benefits, because we've talked about it several times before, but they are important to just give a refresher on how these connect to the unique requirements of the project. 405 00:37:37,980 --> 00:37:50,300 So here you have the slide that shows the benefits and these nice photos describing each of the benefits and what the operations are needed for each of those benefits down below. 406 00:37:51,040 --> 00:37:58,240 So really you can see that trend here, you know, we're capturing and storing local and imported water to use for emergency supply. 407 00:37:58,500 --> 00:38:06,980 And then also capturing natural inflows as you use for environmental benefit. So not going to spend a lot of time on this one, but just wanted to sum that up and have it out here in the information. 408 00:38:09,240 --> 00:38:14,240 And this slide, I think, is important, not sure we've done this before, but just comparing 409 00:38:14,240 --> 00:38:19,260 what Pecheco's operations and what it would look like, how full it would be over a 410 00:38:19,260 --> 00:38:23,880 period of time compared to one of our typical reservoirs. In this case, we use Chesbro, 411 00:38:24,000 --> 00:38:31,400 as an example. And most of our original reservoirs were designed to fill and drain each year. 412 00:38:32,020 --> 00:38:37,920 So, to store water from the local watershed in the winter and send it down to the creek in the 413 00:38:37,920 --> 00:38:42,800 to do groundwater recharge and environmental benefits and, you know, keep those creeks flowing. 414 00:38:43,460 --> 00:38:48,040 So you can see what's the top there, that's what Chesbro looks like in almost every year. 415 00:38:48,500 --> 00:38:50,920 It fills and drains and some years it doesn't fill it all. 416 00:38:51,180 --> 00:38:56,020 We have droughts and then comparing that to the graph there on the bottom and showing what the 417 00:38:56,020 --> 00:38:58,080 Pachaco reservoir would look like. 418 00:38:58,100 --> 00:39:02,420 Just kind of you can tell from the magnitude with Chesbro still shown at the bottom there. 419 00:39:02,420 --> 00:39:07,880 how much more water work we're storing and how it can extend its life through like the 420 00:39:07,880 --> 00:39:14,660 1984 drought. It's still maintained some water in it at the end there as we would have used 421 00:39:14,660 --> 00:39:17,800 that for emergency supply during that drought. 422 00:39:23,070 --> 00:39:25,350 Okay, so those operations connect with some 423 00:39:25,350 --> 00:39:30,510 important pieces on our water rights. So another refresher here we've seen this graph many times 424 00:39:30,510 --> 00:39:35,590 we just wanted to highlight again that the reservoir contains both imported water supplies from 425 00:39:35,590 --> 00:39:40,470 was reservoir, or through our imported water supply system, and natural inflow showing the darker 426 00:39:40,470 --> 00:39:47,910 blue color down below. So there's always some ratio of natural water to imported water stored in 427 00:39:47,910 --> 00:39:50,850 the reservoir, and you give them time based on our modeling. 428 00:39:53,270 --> 00:39:54,790 In so in order to do that, there's 429 00:39:54,790 --> 00:39:59,970 a few different things, we'll need to accomplish that are unique to this project and the first. 430 00:40:00,000 --> 00:40:09,880 Actual pieces with both Central Valley Project and State Water Project to be able to store the water in there, but could potentially be water rights changes as well. 431 00:40:10,340 --> 00:40:18,780 So we're still going through conversations on that and working through the different details and preparing our path forward for that. 432 00:40:18,780 --> 00:40:24,220 We will certainly need to have a change petition for the existing 433 00:40:24,220 --> 00:40:32,000 Pachaco water water district water right, which is what the current reservoir uses, and that's a 7,250 foot 434 00:40:32,000 --> 00:40:36,140 acre foot annual amount of water, and so we will be moving that 435 00:40:37,000 --> 00:40:43,580 Point where the water is released upstream for the new dam location, so that will that will take a 436 00:40:43,580 --> 00:40:45,140 Water right permit change 437 00:40:46,200 --> 00:40:49,200 And lastly, the large one, that's pretty obvious, 438 00:40:49,280 --> 00:40:52,040 will need a new water right to capture flows, 439 00:40:52,360 --> 00:40:54,020 larger flows from the North Park, 440 00:40:54,040 --> 00:40:55,140 particular creek watershed. 441 00:40:55,400 --> 00:40:57,120 So to store that natural inflow, 442 00:40:57,320 --> 00:41:00,060 we'll certainly need to be able to increase, 443 00:41:00,240 --> 00:41:02,380 or get a new water right and increase the amount 444 00:41:02,380 --> 00:41:04,460 that's able to be stored in the expanded reservoir. 445 00:41:05,300 --> 00:41:08,380 And on the next slide, you'll kind of see what these all mean geographically. 446 00:41:09,660 --> 00:41:12,760 So again, number one, you see there, down at the bottom, 447 00:41:12,760 --> 00:41:23,240 That's basically highlighting where the connection point to the Pacheco conduit will be and that will allow us to move water into the reservoir through the Pacheco conduit. 448 00:41:23,520 --> 00:41:30,780 The important water supplies is also move water out into the Pacheco conduit. So there's definitely some contractual changes needed there. 449 00:41:31,600 --> 00:41:55,360 And then number two, you can see the change petition showing that the movement, where the water on the existing North Park dam water right would move to and maintain particular past water districts water right, and just by moving it upstream a bit, and then the third one there, you can see the watershed highlighted above and collecting the water so that comes into that into the reservoir there. 450 00:41:58,570 --> 00:42:05,190 Okay, so next I'll talk about some of the other contractual types of things that we need there unique to the project. 451 00:42:07,170 --> 00:42:15,950 So for the water storage investment program, there's some special requirements that all of the wizard projects have to undergo and they call them public benefit contracts. 452 00:42:16,270 --> 00:42:19,350 So these are contracts with the administering agencies. 453 00:42:19,350 --> 00:42:25,890 in our case to the Department of Water Resources for Emergency Supply and the California Department of 454 00:42:25,890 --> 00:42:29,210 the Fish and Wildlife for the environmental benefits and the creek releases. 455 00:42:30,050 --> 00:42:34,230 So once we get all the details on what this will look like, we'll have to go through a process 456 00:42:34,230 --> 00:42:40,990 to develop these public benefit contracts and work through all the details on the releases will 457 00:42:40,990 --> 00:42:46,890 make or the emergency storage will have in all these different cases. So they will also include 458 00:42:46,890 --> 00:42:59,190 Adaptive management plans, metrics for evaluation, evaluating the, how well the public benefits are working, and then also kind of forward thinking on decision making processes. 459 00:42:59,990 --> 00:43:09,330 So they're pretty involved and we've been working with some of the other water storage investment program projects and talking to them how they're doing on their progress. 460 00:43:09,550 --> 00:43:16,870 There hasn't been a lot of progress on many of the projects. It's it's a pretty complicated issue to really try to hone in on how these all look, but there has been 461 00:43:16,870 --> 00:43:21,950 one project that successfully gone through this as harvest water. So there's some success there. 462 00:43:23,070 --> 00:43:29,030 And then lastly, we'll also need our funding agreement for the full amount of our grant through 463 00:43:29,030 --> 00:43:33,490 the California Water Commission. So that's I'll get into some more details on what the requirements are 464 00:43:33,490 --> 00:43:34,530 for that as well. 465 00:43:39,830 --> 00:43:44,110 So this slide just kind of adds a little bit more detail of what I just described. 466 00:43:44,450 --> 00:43:50,410 So going through the different public benefit types and what the needs are for the public benefit 467 00:43:50,410 --> 00:43:55,350 contracts. So first you have the emergency water supply with the California Department of Water Resources. 468 00:43:56,030 --> 00:43:59,630 And then it shows what the contract considerations are at this point. 469 00:43:59,870 --> 00:44:06,590 With our 2021 supplemental feasibility study we had about 100,000 acre feed of emergency storage. 470 00:44:07,150 --> 00:44:16,130 So we'll have to monetize that with DWR and come up with the way to to show that we're providing that public benefit through that action. 471 00:44:17,170 --> 00:44:21,730 Next, we have the Pachaco Creek Fisheries, that's the releases that go into Pachaco Creek. 472 00:44:22,350 --> 00:44:29,010 So that's with CDFW, and we actually made quite a bit of progress on what our release model looks like. 473 00:44:29,150 --> 00:44:37,350 It's in our draft EIR, and also our supplemental feasibility documentation, showing the benefits to Pachaco Creek through our modeling. 474 00:44:37,930 --> 00:44:45,290 In both keeping the creek wet, you're round to aid in migration up and down the creek, and then also lower the temperatures of the water. 475 00:44:45,290 --> 00:44:47,770 So, we made quite a bit of a headway on that. 476 00:44:47,890 --> 00:44:53,370 We have actually begun conversations with CDFW on that, on that piece. 477 00:44:54,830 --> 00:44:58,350 And then the third one here is the environmental enhancement through, 478 00:44:58,350 --> 00:44:59,970 basically the transfer to the, 479 00:45:00,000 --> 00:45:07,060 All except to work with CDP or the Central Value Project and Reclamation to organize how those transfers will come into play. 480 00:45:08,320 --> 00:45:20,140 So kind of unique considerations for this portion of the project, but it's really important that we have our public benefit structure in a written agreement that we can all understand and share so we can move forward. 481 00:45:22,700 --> 00:45:29,320 Okay, so the California Water Commission or CWC funding agreement, so this is the final funding agreement that's needed. 482 00:45:30,060 --> 00:45:35,920 It's essentially to get the large amount of the grant that remaining 475 million. 483 00:45:37,620 --> 00:45:39,960 So, just listed here, all the things we need. 484 00:45:40,260 --> 00:45:44,160 The first one is the contracts I just described for public benefits. 485 00:45:45,020 --> 00:45:48,320 We'll have to have all of our feasibility studies finalize and complete, 486 00:45:48,320 --> 00:45:55,520 and our final environmental documentation, including our final EIR, and EIS, and then all of the federal 487 00:45:55,520 --> 00:46:01,400 state and local approvals and permits, so everything will have to be inhand, and then any contracts 488 00:46:01,400 --> 00:46:06,800 with other beneficiaries like partners that derive benefits from the project. So essentially we have 489 00:46:06,800 --> 00:46:13,040 to be construction ready before we get the CWC funding, so that's kind of the last contractual milestone 490 00:46:13,040 --> 00:46:17,040 that will happen before we build with it, start construction, of course, after border 491 00:46:17,040 --> 00:46:17,440 approval. 492 00:46:22,380 --> 00:46:28,420 Okay, so this is kind of going back to the unique operations, and the ability to 493 00:46:28,420 --> 00:46:34,180 capture the natural inflows and the unstoppable CBP and state water project supplies, but just kind 494 00:46:34,180 --> 00:46:40,920 of highlighting how that works. And these will require workings with both central valley project and 495 00:46:40,920 --> 00:46:46,760 state water project to orchestrate these movements of imported water. So we would be working closely 496 00:46:46,760 --> 00:46:52,200 as we do with our important water group on making these happen, but this is a key to the project 497 00:46:52,200 --> 00:46:57,500 to build a store, this excess water that comes in these wet years, which we talk about a lot 498 00:46:57,500 --> 00:47:03,540 just really briefly, but there is quite a bit that goes into it. So capturing these natural 499 00:47:03,540 --> 00:47:09,020 inflows into the expanded Chica Resvera already went over that, so that'll make up some ratio 500 00:47:09,020 --> 00:47:14,740 of the store water, but then there's two different types of basically the excess water that comes 501 00:47:14,740 --> 00:47:19,920 in wet years. They call that section 215 water, Article 21 water. Of course, I'm not the expert on 502 00:47:19,920 --> 00:47:25,460 this but others in the room are. So thank you for your help developing this presentation on these slides. 503 00:47:26,300 --> 00:47:32,120 But essentially with those are, is ways that we can get water beyond our current contracts with 504 00:47:32,120 --> 00:47:38,160 both the state and federal systems and store that. And typically now, that water is available in 505 00:47:38,160 --> 00:47:42,740 wet years and we don't always have a place to put it. So that's kind of the major piece of the expanded 506 00:47:42,740 --> 00:47:46,100 the shape of reservoir to be able to utilize that available water. 507 00:47:47,420 --> 00:47:51,060 And then also, we'll call an unstoppable water during wet years. 508 00:47:51,360 --> 00:47:54,160 Sometimes we can't take our entire contract water. 509 00:47:54,800 --> 00:47:58,320 When we have so much water coming into the system and being stored in a reservoirs, 510 00:47:58,340 --> 00:48:02,340 just our existing contracts, we can't maximize them in some years. 511 00:48:02,780 --> 00:48:05,600 That's what that fourth bullet means there. 512 00:48:06,300 --> 00:48:09,620 And so kind of trying to get some perspectives on what this looks like. 513 00:48:09,620 --> 00:48:17,460 we did the quick 2023 water year case study, which was a wet year, especially in the Pachaco water shed. 514 00:48:17,960 --> 00:48:23,100 And so what we calculated there from what we had in our system and measuring the streamgates 515 00:48:23,100 --> 00:48:29,660 along Pachaco Creek and above the reservoir itself is almost 43,000 acre feet of natural inflow 516 00:48:29,660 --> 00:48:36,880 would have come into the reservoir in that water year and there would have been about 58,000 acre feet 517 00:48:36,880 --> 00:48:44,020 available article 21 and section 2115 water. So that's that water above our contract. 518 00:48:44,740 --> 00:48:50,080 And then there could have been about 20,000 acre feet of our own contract water that we could have 519 00:48:50,080 --> 00:48:55,720 stored in particular reservoir in that year. So that would have been a pretty beneficial year for 520 00:48:55,720 --> 00:49:00,360 the reservoir. Of course, all years are not like that, but that is really the purpose of this project 521 00:49:00,360 --> 00:49:05,480 is to really bank on those wet years when the water comes and be able to store it in this 522 00:49:05,480 --> 00:49:07,620 of Oregon use it for the dryers. 523 00:49:12,570 --> 00:49:16,110 Okay, so just wanted to list a couple other unique elements of 524 00:49:16,110 --> 00:49:21,850 the project first. There are many to this large and complex project, but I just want to highlight 525 00:49:21,850 --> 00:49:27,550 these that we'll be talking about in future presentations or we've also covered in past presentations. 526 00:49:28,350 --> 00:49:31,490 But the first one is the partnership opportunity. So we have been 527 00:49:32,890 --> 00:49:37,930 directed by the art board to pursue partnerships on this project to help fund it and offer up 528 00:49:37,930 --> 00:49:41,370 to 50,000 acre feet of storage capacity for partners. 529 00:49:42,030 --> 00:49:43,250 So there will be more presentations 530 00:49:43,250 --> 00:49:45,150 and details on that in the future. 531 00:49:46,270 --> 00:49:48,250 We've talked about the incidental flood protection, 532 00:49:48,610 --> 00:49:49,930 but can't go without mentioning. 533 00:49:50,990 --> 00:49:54,130 It is a pretty major incidental benefit to the project, 534 00:49:54,230 --> 00:49:55,970 and we present on that in the past. 535 00:49:56,770 --> 00:49:59,970 And then there are all kinds of neat facts about this. 536 00:50:00,000 --> 00:50:06,760 This project in how big it is and how unique it is. But, you know, it is the first new reservoir and dam in Santa 537 00:50:06,760 --> 00:50:14,440 Clara County since 1957. So over 67 years since we've done anything remotely close to this, but it also 538 00:50:14,440 --> 00:50:20,560 expands on an existing reservoir that is not currently owned by Valley Water, but within Santa Clara County. So 539 00:50:20,560 --> 00:50:25,160 really kind of the unique element in itself that kind of drives this opportunity. 540 00:50:28,680 --> 00:50:29,640 Okay, so I had 541 00:50:29,640 --> 00:50:32,900 thank you Ryan committee members 542 00:50:35,430 --> 00:50:39,710 thank you 543 00:50:42,880 --> 00:50:46,060 Ryan for the presentation can you 544 00:50:46,060 --> 00:50:52,340 explain a more detail about this in multi-year operation for particular 545 00:50:52,340 --> 00:50:59,420 that's not clear understand it completely so does that mean that we put 546 00:50:59,420 --> 00:51:04,240 water in there we don't release water until the time we need it no matter how long 547 00:51:04,240 --> 00:51:11,160 period is. Yeah, so that's one I understand in bed. Yeah, that's it in a nutshell. So this is all 548 00:51:11,160 --> 00:51:17,760 based on our weep modeling, which is kind of our local model that we use to incorporate all of 549 00:51:17,760 --> 00:51:24,040 our different water supply assets throughout our whole system. So, you know, in wet years, 550 00:51:24,780 --> 00:51:29,980 the water isn't really needed from the checkup, right? We can get it from Anderson. We can get it 551 00:51:29,980 --> 00:51:43,300 I should have also mentioned that I did use Chesbro as an example, but Anderson does somewhat operate a bit like the Chaco when it's not restricted and of course not empty, but it is currently not operating now. 552 00:51:43,800 --> 00:51:55,920 But it same kind of concept is to have some some carryover of water stored in the wet years, but it wouldn't last as long as Chaco because we would utilize that water from Anderson most likely before that. 553 00:51:55,920 --> 00:51:58,540 but the wheat modeling considers all the different pieces 554 00:51:58,540 --> 00:52:01,560 going into it and adds Pacheco into it 555 00:52:01,560 --> 00:52:05,080 and kind of evaluates how it would be used in that scenario. 556 00:52:07,660 --> 00:52:13,320 So, there will be any blue curve type of thing 557 00:52:13,320 --> 00:52:18,600 for if we have Pacheco in place for operation, 558 00:52:19,740 --> 00:52:24,120 it'll will be operating at based on year by year, 559 00:52:24,120 --> 00:52:28,400 uh... situation and then decision to be made uh... 560 00:52:28,400 --> 00:52:30,100 uh... year to year basis 561 00:52:30,840 --> 00:52:32,700 yeah for the water supply component 562 00:52:32,700 --> 00:52:36,120 uh... yes you're you're right but there will be a rule curve 563 00:52:36,120 --> 00:52:38,800 for the creek releases so we will have 564 00:52:38,800 --> 00:52:42,560 a rule curve developed through our public benefits contract cdfw 565 00:52:42,560 --> 00:52:44,180 like i described that 566 00:52:44,180 --> 00:52:48,060 releases about an average about nine thousand acre feet per year 567 00:52:48,060 --> 00:52:50,860 and so that's supposed to come out of the uh... the 568 00:52:50,860 --> 00:52:52,880 the natural inflow watershed bucket 569 00:52:52,880 --> 00:52:57,440 So that's for the environmental benefit. 570 00:52:57,460 --> 00:52:57,740 So that's for the environmental benefit. 571 00:52:59,100 --> 00:53:06,300 So what I'm also concerned is that 572 00:53:06,300 --> 00:53:11,500 the incidental flow protection benefit 573 00:53:11,500 --> 00:53:16,340 do we anticipate that in our operation or 574 00:53:16,340 --> 00:53:18,240 strictly incidental. 575 00:53:18,880 --> 00:53:22,220 So the way that we have that set up in our operations now 576 00:53:22,220 --> 00:53:29,000 is that each year we would have at least the existing reservoirs capacity available in the reservoir. 577 00:53:30,360 --> 00:53:35,980 Okay, so it's about 5,500 acre feet now, the current reservoir. And so each year as we get 578 00:53:35,980 --> 00:53:40,400 into November, we'll make sure that we have at least that much space available in the reservoir, 579 00:53:40,540 --> 00:53:46,480 so we wouldn't be ever increasing, but it also be unlikely at that time a year that we would have, 580 00:53:46,480 --> 00:53:51,880 you know, much more than that anyway. But so that's kind of our baseline. But in most 581 00:53:51,880 --> 00:53:57,980 there's more available. And I think we did a slide back a few presentations ago that showed 582 00:53:57,980 --> 00:54:03,480 kind of the averages and what's available. But usually when you get into a wet year you're coming 583 00:54:03,480 --> 00:54:08,300 out of a dry year. So there must likely be much more available. If we use some of that for water 584 00:54:08,300 --> 00:54:23,200 supplier in that year. Thank you. My other question is that I'm starting the slides of 585 00:54:23,200 --> 00:54:33,160 55 and particularly 56. I was ability to capture natural info and on storeable CPM 586 00:55:00,460 --> 00:55:29,520 The point of these bullets are we will dispatch it to how well have these benefits. So as for the challenging requirement in order to give these benefits, what are the other any special requirements that's making these benefits. 587 00:55:29,520 --> 00:55:35,120 It's a real-life, a particular movie challenging, and then difficult takes a long time in 588 00:55:35,120 --> 00:55:35,820 that. 589 00:55:36,900 --> 00:55:41,480 I don't think particularly challenging, because these are available now, these mechanisms, 590 00:55:41,960 --> 00:55:44,480 but just not available to put into an expanded reservoir. 591 00:55:45,720 --> 00:55:49,580 So really we just want to make sure, you know, you're for year we're looking and paying attention 592 00:55:49,580 --> 00:55:54,260 to what is available through these different mechanisms and trying to utilize that. 593 00:55:54,280 --> 00:55:58,560 So it's really just kind of adding, you know, kind of a new element to, you know, an important 594 00:55:58,560 --> 00:56:03,920 water group and what they do and, you know, looking for additional water sources in these years. 595 00:56:04,540 --> 00:56:09,500 So there's not really anything we have to do. I don't believe and please help me if I'm wrong, 596 00:56:09,600 --> 00:56:14,360 contractually ahead of time to secure these or anything that is really kind of on a case by case 597 00:56:14,360 --> 00:56:16,200 basis. Okay. 598 00:56:18,880 --> 00:56:24,620 Okay. Okay. Okay. That's, that's well, I hope to, I hope to hear that it's a, 599 00:56:24,620 --> 00:56:34,480 It's not something that in addition to what we currently do, and then just so basically the 600 00:56:34,480 --> 00:56:40,480 opportunities that's available now, we cannot utilize those opportunities. 601 00:56:41,160 --> 00:56:49,020 And then these benefits, data here, gave us the ability to realize some of these opportunities. 602 00:56:49,020 --> 00:57:00,300 But it's so all the rules and regulation and negotiation already in place, that's basically what we need. 603 00:57:00,720 --> 00:57:08,460 There's no additional lots of work, requirement related to realizing these potential benefits. 604 00:57:11,690 --> 00:57:15,210 There's still some details that need to be completely put together. 605 00:57:15,210 --> 00:57:28,250 There's still, sorry, the Pacheco project is still working on its operations curves and how things will work and then we'll still be working together on how it will partner with our other projects and making sure we're looking there. 606 00:57:28,370 --> 00:57:30,710 We were specifically talking about 2015 and 21. 607 00:57:31,770 --> 00:57:39,390 There may be, we may not, you know, depending on how things work, we may take that water in locally and we may store other water in that particular area. 608 00:57:39,390 --> 00:57:45,550 we may not be that particular water but the crux or the what will be realized if we have 609 00:57:45,550 --> 00:57:51,390 storage available when water is excess and there is 2015 or 21 available there is the ability 610 00:57:51,390 --> 00:57:58,610 to store a type of water in Pacheco and so I just wanted to you I know you I'm sorry to make it 611 00:57:58,610 --> 00:58:02,770 complicated and I know you can't ask to direct question is it is it completely set up right now 612 00:58:02,770 --> 00:58:08,390 and I just want to let you know that it's not completely set up on how to make that into the various 613 00:58:08,390 --> 00:58:13,430 things as Ryan talked about. There are various ways we have to make sure we can put the water in those various places. 614 00:58:13,810 --> 00:58:20,530 And if it's not 2015 or 21, we will be able to put other water into Chaco and use that to 15 and 21 locally. 615 00:58:22,390 --> 00:58:22,430 Okay. 616 00:58:23,250 --> 00:58:33,390 So I think originally when this started with this committee that we asked for these topics to be. 617 00:58:35,530 --> 00:58:42,150 study them, then presented to a full board, the whole idea is that any challenges that, 618 00:58:42,150 --> 00:58:50,610 any new challenges that we currently don't, and don't do, or we do, never, never, never 619 00:58:50,610 --> 00:58:54,590 happens, is for the board to understand these things. 620 00:58:54,990 --> 00:59:02,410 So that when we make decisions, these things can be, they can be, in our head, that this 621 00:59:02,410 --> 00:59:09,230 work, this may not work, that kind of thing. So that's why I ask these questions. And this, the, the, 622 00:59:09,530 --> 00:59:16,990 the, to me, the, uh, uh, uh, probably number one reason that we're either even considering 623 00:59:16,990 --> 00:59:23,690 particularizable is because of these bullet points on this particular slides, right? Yeah. So it is really, 624 00:59:25,470 --> 00:59:44,070 it's something that it's it's it's can be can be accomplished. You see a lot of work and a lot of effort. Yeah, it's not something like we keep working on it. Keep working on it and the opt coaches too big and it can never happen. That's why I asked the question. 625 00:59:45,250 --> 00:59:52,930 So yeah, if I, if I may, I would just say, you know, similar to cis we've been negotiating 626 00:59:52,930 --> 00:59:59,970 with the bureau to nail down how the operations would, and 627 01:00:06,100 --> 01:00:29,980 Thank you. My last question is that remind me that I think when we came up at this committee 628 01:00:29,980 --> 01:00:34,680 measure to mitigate plant, like a mitigation measure, 629 01:00:34,940 --> 01:00:37,000 plant half of what these are, you were meant to impact. 630 01:00:37,660 --> 01:00:43,340 And that we haven't, we haven't seen that discussion yet, you know? 631 01:00:45,500 --> 01:00:49,460 I don't think so. I thought we had a presentation on 632 01:00:49,460 --> 01:00:56,340 environmental kind of topics. We can't remember what we gave that one or not. 633 01:00:56,340 --> 01:01:08,740 Okay, apologies, but yeah, let me look back into that. Okay, we certainly plan to discuss it because there are, there's a lot, I mean, I suppose they're unique, but we do mitigation for all of our projects. 634 01:01:08,800 --> 01:01:10,360 Yeah, I know, yeah. 635 01:01:11,140 --> 01:01:13,620 We can get into more detail in the environmental discussion. 636 01:01:13,920 --> 01:01:25,400 We do mitigation according to these rules and regulations and by getting permits, I think the original thought of having that as a separate category is that. 637 01:01:26,340 --> 01:01:31,180 is the mitigation going to be so big, that's really beyond. 638 01:01:34,120 --> 01:01:35,820 Well, this is a bit much easier. 639 01:01:36,440 --> 01:01:38,440 Yeah, just that because we hear these things, 640 01:01:39,260 --> 01:01:41,460 and it exactly how big it is 641 01:01:41,460 --> 01:01:45,600 and how do we anticipate that kind of, 642 01:01:46,000 --> 01:01:48,520 as we move forward, we're going to learn more and more about 643 01:01:48,520 --> 01:01:52,560 what kind of a requirement and then a sequel process 644 01:01:52,560 --> 01:01:59,000 process and need a process that's going to be requires to mitigate. Just because of the size 645 01:01:59,000 --> 01:02:13,760 of this project, how if it's a far beyond the usual mitigations that we do for our other project, 646 01:02:13,760 --> 01:02:19,420 this is, let's something that the board should know. 647 01:02:19,820 --> 01:02:23,340 Would you like to add a little bit of discussion about that? 648 01:02:23,440 --> 01:02:25,800 I think the presentation of the board on this topic goes. 649 01:02:26,000 --> 01:02:28,280 I think that would be, I think that would be good. 650 01:02:29,200 --> 01:02:36,040 Actually, one of the reasons that a generous in my mind is that 651 01:02:36,920 --> 01:02:41,060 this public comment from Sierra Club about some of these issues. 652 01:02:41,060 --> 01:02:44,500 So I thought, those are all good issues. 653 01:02:44,560 --> 01:02:48,240 However, it seems that they fall into a category 654 01:02:48,240 --> 01:02:50,860 of that we already said. 655 01:02:51,240 --> 01:02:53,400 We're going to the Borses, the oil, 656 01:02:53,560 --> 01:02:58,420 at least understand that the size and then the extent 657 01:02:58,960 --> 01:03:02,340 of the mitigation related to this project. 658 01:03:02,880 --> 01:03:05,140 If it's regular, it's good. 659 01:03:05,320 --> 01:03:08,760 If it's not, it's beyond our regular project, 660 01:03:08,960 --> 01:03:10,260 we need to know about that. 661 01:03:10,260 --> 01:03:20,520 And of course, there's a money associated with that also. Yeah. So, okay. And that's my question. Thank you, Chair. 662 01:03:20,920 --> 01:03:22,920 Thank you. What a remission. 663 01:03:26,150 --> 01:03:38,570 Thank you. Two things struck me when is how incredibly complex all of this is. There's a lot of movie parts. 664 01:03:39,570 --> 01:03:55,780 There's certain levels of risk associated with some things and a lot of things need to come together in the most optimistic world. 665 01:03:56,900 --> 01:04:04,720 Yeah, the other thing that struck me was, we used the word unique nine times in the staff report. 666 01:04:05,460 --> 01:04:14,700 I didn't count it in the presentation, but certainly Mr. MacArthur used unique quite extensively. 667 01:04:14,880 --> 01:04:23,620 And I actually looked it up, the synonyms for unique, it's an adjective, distinctive, individual, special, idiosyncratic, 668 01:04:23,620 --> 01:04:31,140 working, eccentric, isolated, single, solo, lone, solitary, uncommon, unusual, peculiar, 669 01:04:31,160 --> 01:04:38,860 novel-strange odd, sweet generous. So I don't know that it's the best word to emphasize 670 01:04:38,860 --> 01:04:43,060 that much, because we don't want to be ideas in Cratica, or Corky. 671 01:04:45,280 --> 01:04:50,960 Chair, I'm sorry, can I interrupt? I think I started when I started 672 01:04:52,540 --> 01:04:55,060 this discussion, I used the work you need. 673 01:04:55,720 --> 01:04:59,960 Yeah, in my mind, I was thinking that this is something that's just related. 674 01:05:05,340 --> 01:05:17,600 So, it's not Ryan, it's not Ryan, it's not Ryan that uses what it is, and then they just use this word as a, we're going to take a vote on how many, how many people like unique and how they feel like special. 675 01:05:19,060 --> 01:05:32,040 Okay, anyone like City of Syncratic, but so, and thank you for that explanation, and also by the way, Churchway, thank you for your questions, which I think are important to be able to address the board. 676 01:05:32,800 --> 01:05:40,660 I'm going to just briefly touch on some of the Sierra Club comments first and then go through the presentation. 677 01:05:43,940 --> 01:05:54,640 So the Sierra Club said the benefits are not as concerning as unique project requirements and which merit much more attention from the board and staff. 678 01:05:55,540 --> 01:06:02,020 And so I agree with that. I think we've heard a lot about the benefits of the project and there are benefits to this project. 679 01:06:04,180 --> 01:06:12,940 But there's a lot of requirements, and I think there's a lot of uncertainty too, including the challenges that will or might arise. 680 01:06:14,560 --> 01:06:25,520 One issue that, and a lot of these, I think, factor into kind of an environmental perspective like requirements related to the incursion into a state park. 681 01:06:25,520 --> 01:06:37,680 I think that's opening a whole can of worms and I think we need to have a better handle on how that could potentially impact the project. 682 01:06:38,660 --> 01:06:47,520 And then just the comment, requirements related to managing the largest and most complex infrastructure project ever undertaken by Valley Water. 683 01:06:48,680 --> 01:06:50,220 complexity of project management, 684 01:06:50,600 --> 01:06:51,360 risk of delay, cost, 685 01:06:51,660 --> 01:06:53,020 escalation, land acquisition, 686 01:06:53,480 --> 01:06:54,880 challenges, other remote location. 687 01:06:55,200 --> 01:06:55,970 That's a big one. 688 01:06:59,880 --> 01:07:03,860 Again, I think I think I want to see sort of the level of risk 689 01:07:03,860 --> 01:07:06,980 associated with things and have those defined. 690 01:07:09,320 --> 01:07:11,600 Specific content in the staff report. 691 01:07:12,780 --> 01:07:17,160 We talk a lot about processes in regards to water rights 692 01:07:17,160 --> 01:07:22,160 and CVP contractual changes, it would be great 693 01:07:22,160 --> 01:07:25,260 to have those described in more detail, 694 01:07:25,400 --> 01:07:27,960 including the milestones and probable time frames. 695 01:07:28,980 --> 01:07:31,120 And the process for land acquisition 696 01:07:31,120 --> 01:07:34,040 and eminent domain should also be described. 697 01:07:34,540 --> 01:07:38,240 Given that it doesn't seem like we have particularly 698 01:07:40,200 --> 01:07:43,120 amenable partners willing to sell to us. 699 01:07:43,880 --> 01:07:45,740 So there's other comments as well, 700 01:07:45,740 --> 01:07:47,820 but those are kind of the main ones. 701 01:07:51,780 --> 01:07:54,820 So, looking through the presentation, 702 01:07:58,720 --> 01:08:02,460 water rights page 7 of 17. 703 01:08:03,820 --> 01:08:10,300 So, again, these are things that have time frames, 704 01:08:10,380 --> 01:08:13,000 and durations and issues. 705 01:08:14,840 --> 01:08:17,140 So, potential changes to imported water contracts 706 01:08:17,140 --> 01:08:18,060 or water rights. 707 01:08:18,060 --> 01:08:26,860 So, we may, and I think likely need to have contractual changes regarding storing important 708 01:08:26,860 --> 01:08:28,060 water supplies. 709 01:08:28,960 --> 01:08:34,660 So, I'd like to see a little more definition, or at least level of risk, potential range 710 01:08:34,660 --> 01:08:39,880 of time frame for these things to happen, and then the particular past water district water 711 01:08:39,880 --> 01:08:45,600 right permit, that needs to be a change petition and to modify the point of diversion. 712 01:08:45,600 --> 01:08:52,060 that's going to take time and effort. And then the new water right to appropriate natural 713 01:08:52,060 --> 01:08:59,460 inflow from surrounding watershed for storage. And I'll get to the comment on that we're 714 01:09:00,200 --> 01:09:05,280 we get into more detail, but all of these things have a certain level of risk. All of these have 715 01:09:05,280 --> 01:09:11,480 timeframes that we don't want to say they're impossible, but we don't want to be 716 01:09:11,480 --> 01:09:16,600 and do the optimistic either that we need to identify those, um, appropriately. 717 01:09:19,280 --> 01:09:23,860 And then if we go on to 718 01:09:29,300 --> 01:09:34,880 age 11 of 17, um, the contracts for administering public benefits. 719 01:09:36,500 --> 01:09:45,350 So we identify three public benefits type emergency water supply, environmental enhancement for 720 01:09:45,350 --> 01:09:48,230 take a creek fisheries, environmental enhancement 721 01:09:48,230 --> 01:09:52,290 for the Sengwakeen Watershed Wildlife Refuges. 722 01:09:53,110 --> 01:09:57,070 And then we have a contract entity, DWR, 723 01:09:57,350 --> 01:09:59,970 Artificial Wildlife, and again, Department of Fish and Wildlife. 724 01:10:00,000 --> 01:10:29,760 We identify three public benefits type, emergency water supply, environmental enhancement for the Pacheco Creek fisheries, environmental enhancement for 725 01:10:32,960 --> 01:10:33,000 the St. 726 01:10:33,000 --> 01:10:38,540 And I definitely see the benefit of the emergency water supply for valley water. 727 01:10:38,980 --> 01:10:51,050 When I look at the other two, to me, it seems like the benefit is more associated with 728 01:10:51,050 --> 01:10:55,090 another county than necessarily our county. 729 01:10:55,310 --> 01:11:01,070 And maybe I'm looking at that wrong, I don't know, do you even answer to that? 730 01:11:01,070 --> 01:11:10,770 Yes, so the California water commission considers them state benefits. So they don't really look at it as a county on a whole. So a lot of these other projects are very much regional sites, 731 01:11:10,770 --> 01:11:26,230 most of the carols, of course, we know that they're benefiting other counties, but with these contracts for public benefits, it's with the state and a requirement of the California water commission to basically confirm how much money will be 732 01:11:26,230 --> 01:11:31,730 basically giving back to the public and they consider the public state, not Santa Clara County, not San Bernardo County. 733 01:11:35,350 --> 01:11:46,270 So does that mean that by the project providing these benefits, it makes it easier for us to get permits or money or. 734 01:11:46,330 --> 01:11:50,190 These are directly connected to our the state, was it funding. 735 01:11:50,750 --> 01:11:56,650 Okay. Yeah, so it's basically to justify our our funding contribution from the state by providing these public benefits. 736 01:11:56,650 --> 01:12:04,850 Okay, and maybe, I think that's a great explanation, and I think clarifying that would 737 01:12:04,850 --> 01:12:06,250 be be useful. 738 01:12:08,590 --> 01:12:18,970 And Director Shway asked a question on page 14 of 17, the ability to capture natural inflows 739 01:12:18,970 --> 01:12:22,850 an unsterable CDP and state water private supplies. 740 01:12:25,650 --> 01:12:29,790 So this water, where's it going right now? 741 01:12:29,810 --> 01:12:30,730 What is that water doing? 742 01:12:30,950 --> 01:12:32,610 And I'll tell you I'm asking that question 743 01:12:32,610 --> 01:12:37,630 because sometimes I'm concerned about whether we might have 744 01:12:37,630 --> 01:12:39,010 an environmental issue, right? 745 01:12:39,030 --> 01:12:42,910 Like sometimes water that isn't going directly towards water 746 01:12:42,910 --> 01:12:46,770 supply may be serving some sort of environmental benefit. 747 01:12:46,770 --> 01:12:49,970 And I don't know, I can't tell if that's the case here. 748 01:12:51,710 --> 01:12:54,530 Someone else in the room manager, I'm not sure where it goes. 749 01:12:54,950 --> 01:12:58,490 I'm more focused exclusively on BHACO in our system. 750 01:12:59,570 --> 01:13:09,970 I'll start off with just kind of saying that there are specific requirements and specific operating parameters in which the central valley project and state water project can offer what they call 751 01:13:09,970 --> 01:13:16,930 excess or floods low water in typically under section 215 or article 21 of our contracts. 752 01:13:17,670 --> 01:13:24,870 With that, I'm going to divert it to Cindy a little bit, but in the end, these are waters that are typically only available in the 753 01:13:24,870 --> 01:13:37,410 wetest of years when all the other requirements have been environmental and other requirements have been met and then they have permission to divert these excess sometimes called floods low but Cindy. 754 01:13:40,710 --> 01:13:46,850 So during what conditions these has air and mention these types of water can be made available 755 01:13:46,850 --> 01:13:52,250 through our existing contracts, our state water project and CBP contracts, we have access 756 01:13:52,250 --> 01:13:54,770 to be supplies through those contracts currently. 757 01:13:56,470 --> 01:14:02,110 We take very little of those supplies typically because when those supplies are available, 758 01:14:02,110 --> 01:14:12,010 You know, it's wet and our existing storage situation is typically full, so we don't have any place to put those water supplies. 759 01:14:12,710 --> 01:14:23,110 If we have additional storage, we would be able to secure those supplies through our existing contracts and, you know, theoretically, we would put those in storage. 760 01:14:23,110 --> 01:14:30,010 So, those supplies are the, are supplies we plan to store in, in CISC. 761 01:14:31,770 --> 01:14:38,650 And if the Chaco were available, we would intend to store those supplies in the Chaco as well. 762 01:14:41,490 --> 01:14:46,470 So, just to make sure I understand you guys, and I thank you for the explanations. 763 01:14:46,470 --> 01:14:56,850 In essence, this water is not providing any kind of real environmental benefit because it's a wet year, right? 764 01:14:58,030 --> 01:14:59,730 So, so it truly is. 765 01:15:00,000 --> 01:15:29,480 In addition to all the supplies needed to meet the requirements under the biological opinions under the incidental take permit under the water quality control plan all of those water quality and a biological requirements are met and the state and federal projects are pumping all they can to put into storage and meet general project needs and then this is water on top of that that would otherwise go out to the bay not meeting any criteria or identified need. 766 01:15:30,000 --> 01:15:33,760 So I sometimes think that water that goes out to the bay does serve an environmental 767 01:15:33,760 --> 01:15:39,720 benefit, but thank you for that presentation. Maybe when it goes to the full board, 768 01:15:39,940 --> 01:15:47,680 just being a little more explicit that this is definitely a legitimate use for that water, 769 01:15:48,100 --> 01:15:55,760 and that shouldn't be problematic. And then on the last page of the slide, 770 01:15:59,010 --> 01:16:06,670 We have partnership opportunity, I don't think that we've heard from any partners yet that 771 01:16:06,670 --> 01:16:10,710 actually are offering financial participation at this point. 772 01:16:10,730 --> 01:16:13,650 That's what we heard last time and I'm assuming that's still the case. 773 01:16:13,930 --> 01:16:14,390 That's correct. 774 01:16:14,630 --> 01:16:17,430 Yeah, we do have some interest, but nothing set yet. 775 01:16:19,250 --> 01:16:25,190 And do any of the interested parties have the wherewithal to provide significant funding? 776 01:16:25,190 --> 01:16:46,150 I believe they do. I think it's like like us, it's almost a large scale decision making process and what they want to invest in, you know, in different types of infrastructure, but they do recognize the need for expanding their their storage in the future and being able to kind of do the same thing we're doing is is to water and what years to use in dry years. 777 01:16:47,250 --> 01:16:54,630 Okay, because the the first partners that we were identifying for the most part didn't seem to have, you know, much in a way. 778 01:16:54,630 --> 01:16:56,390 of cash to bring to the deal. 779 01:16:56,670 --> 01:16:59,090 But so it's encouraging to know that other parties 780 01:16:59,090 --> 01:17:03,810 are willing to, are looking at investing in this. 781 01:17:04,410 --> 01:17:06,630 And then under incidental flood protection, 782 01:17:06,710 --> 01:17:10,090 this is something I asked about at our last meeting. 783 01:17:10,670 --> 01:17:13,310 And first we were saying the project provide flood protection. 784 01:17:13,330 --> 01:17:15,270 And now we're saying incidental flood protection, 785 01:17:15,390 --> 01:17:16,690 which is good, that's correct. 786 01:17:17,710 --> 01:17:21,110 I do think that we need to quantify. 787 01:17:22,110 --> 01:17:27,070 And I think reduces extensive flooding even for frequent small events. 788 01:17:28,030 --> 01:17:30,970 I don't know that we've done a real analysis of that. 789 01:17:30,970 --> 01:17:33,930 And I would like to see an analysis of that. 790 01:17:33,930 --> 01:17:38,870 If we're going to be taking credit for blood reduction, 791 01:17:39,050 --> 01:17:44,890 we should be able to identify to some extent what that might entail. 792 01:17:45,550 --> 01:17:47,870 Okay, that's it. Thank you. 793 01:17:48,950 --> 01:17:58,030 any other comments, anybody in the building? Okay, we have Stephanie, anybody that we knew we have Jim 794 01:17:58,030 --> 01:18:02,690 minus, we have the Sierra Club, no more than we've given to us, but go ahead, please. 795 01:18:04,680 --> 01:18:11,380 So there are, yes, there's one online comment, Kay Irvin, and there's one in person comments. 796 01:18:11,380 --> 01:18:12,380 Thank you. 797 01:18:17,950 --> 01:18:19,130 Good afternoon. 798 01:18:19,810 --> 01:18:20,170 Good afternoon, committee. 799 01:18:20,670 --> 01:18:21,990 Can you hear me? 800 01:18:22,550 --> 01:18:22,570 Really? 801 01:18:24,960 --> 01:18:25,480 Okay, sorry. 802 01:18:25,700 --> 01:18:28,140 I'm not sure why it's not working better. 803 01:18:28,800 --> 01:18:29,360 Good night. 804 01:18:29,900 --> 01:18:30,160 Okay. 805 01:18:31,720 --> 01:18:36,780 I want to thank the directors for your questions and for recognizing some of this year's 806 01:18:36,780 --> 01:18:37,780 class comments. 807 01:18:38,880 --> 01:18:44,400 As communicated in our comments, we are very disappointed in the minimal information and discussion 808 01:18:44,400 --> 01:18:52,500 provided about the unique challenges involved in the planning design and permitting for the 809 01:18:52,500 --> 01:19:01,060 new Pacheco-reservant. And I wanted to emphasize the questions about water rights for natural 810 01:19:01,060 --> 01:19:08,680 flows from the north or Pacheco Creek. It's unclear how much water will be available and if it's 811 01:19:08,680 --> 01:19:16,140 the additional cost and time, it will take to obtain this permit. I would also like to note 812 01:19:16,140 --> 01:19:20,760 that this is the first time I've seen a definitive statement that Valley Water will apply 813 01:19:20,760 --> 01:19:23,600 for water rights for natural flow. 814 01:19:25,680 --> 01:19:38,660 And then I heard that it was important possibly for the 815 01:19:38,660 --> 01:19:50,660 but I just think there needs to be more detailed information about where all the natural inflow 816 01:19:50,660 --> 01:19:58,220 goes, what are all the uses, and the process, also the process for obtaining water rights 817 01:19:58,220 --> 01:19:59,980 for the natural influence. 818 01:20:01,460 --> 01:20:03,580 There are no hands raised on mine. 819 01:20:03,600 --> 01:20:06,560 Thank you, Stephanie. We have Jim Curl here on 4.3. 820 01:20:09,330 --> 01:20:09,570 Jim. 821 01:20:09,950 --> 01:20:17,870 Good morning. My name is Jim Cool. I am a civil activist and environmental activist advocate. 822 01:20:19,850 --> 01:20:26,110 I apologize. I sent nine questions to the board here. 823 01:20:26,110 --> 01:20:40,210 And I sent them in Sunday morning and I frankly didn't have notice of this meeting and didn't have an opportunity to generate a really cogent response. 824 01:20:40,730 --> 01:20:41,950 But you have nine questions. 825 01:20:43,170 --> 01:20:48,190 I'm not going to bog this meeting down with nine detailed questions. 826 01:20:51,190 --> 01:20:54,090 But let me read this kind of response I have here. 827 01:20:54,090 --> 01:21:04,370 I was shocked after reviewing the planned presentation here that only the benefits of Pacheco were being presented and not also the disadvantages. 828 01:21:06,350 --> 01:21:18,170 There is no valley water independent devil's advocate process testing the effectiveness of proposed projects with comparative benchmark steps in place. 829 01:21:19,520 --> 01:21:25,540 The devil advocates role responsibility evidently resides with the board of directors. 830 01:21:26,420 --> 01:21:35,420 However, I have seldom observed tough questions being asked by the board, who remain very supportive of the established programs. 831 01:21:36,840 --> 01:21:46,280 I find it shocking that a primary reliance exists on ad hoc residents such as myself to ask difficult penetrating questions. 832 01:21:47,750 --> 01:22:04,750 Valley Water is an unprecedented program of investing $30 billion, inclusive of interest in the next 20 years and multiple infrastructure projects that will raise North County's wholesale groundwater, 620%. 833 01:22:04,750 --> 01:22:11,850 The need for investment is driven by concerns of extended drought caused by climate change that 834 01:22:11,850 --> 01:22:18,430 will cut off the imported Delta water supply for extended droughts and climate colleges 835 01:22:19,320 --> 01:22:20,930 are unable to forecast. 836 01:22:22,250 --> 01:22:28,710 The investment program is also being driven by unrealistic aid bag population growth of 1% per 837 01:22:28,710 --> 01:22:40,930 requiring more water, when realistically the population is declining, or will be flat because of Bay Area cost of living prices. 838 01:22:42,150 --> 01:22:51,590 Pachaco is by far the least effective of the three reservoir expansions which are planned with an investment of 5.6 billion with interest. 839 01:22:51,590 --> 01:23:04,610 The results in a cost of $29,500 per acre foot produced in comparison, but Kerosene expansion will cost $5,100 per acre foot. 840 01:23:05,270 --> 01:23:09,090 The problem is the Chaco site is less than ideal for building a reservoir. 841 01:23:10,430 --> 01:23:18,530 The board needs to request that both pros and cons, and be identified, and the questions 842 01:23:18,530 --> 01:23:19,950 submitted once, 843 01:23:22,360 --> 01:23:23,720 if you want me to continue on with. 844 01:23:23,720 --> 01:23:24,320 Yes, go ahead. 845 01:23:24,800 --> 01:23:25,320 Okay. 846 01:23:25,760 --> 01:23:31,880 Focus needs to be on whether a Pacheco expansion is necessary, and whether a catalyst in San Luis 847 01:23:31,880 --> 01:23:38,960 Reservoir expansions are then, then self-power, solos, sufficient in the design, drought, weak 848 01:23:38,960 --> 01:23:42,820 simulation to achieve satisfactory water supply resiliency. 849 01:23:44,680 --> 01:23:50,000 When coupled with San Jose direct portable reuse refinery, 850 01:23:50,500 --> 01:23:54,960 recycle water exchange, and order local salt water desalination. 851 01:23:56,380 --> 01:23:59,800 Limiting the Chaco would fund most of these other programs, 852 01:24:00,140 --> 01:24:03,420 and significantly decreased the North County projected whole soil, 853 01:24:04,320 --> 01:24:06,540 water charge, easing the cost of living crisis. 854 01:24:07,800 --> 01:24:15,700 project pruning is overdue. That's much fun. Thank you Jim. Okay. Any other comments 855 01:24:15,700 --> 01:24:22,040 on anybody? Barbara, go ahead. Yeah, just one thing. You know, I was struck by the fact that 856 01:24:23,500 --> 01:24:32,800 on some of our projects like for example Anderson, we have an external panel of experts and we 857 01:24:32,800 --> 01:24:41,380 also have that on our advanced purified water program or we have people that are at least 858 01:24:41,380 --> 01:24:47,520 following what the changes in the regulations are. I think it might be helpful to do something 859 01:24:47,520 --> 01:24:54,720 similar on the Chaco given how complex it is. I think it's hard for the average person to 860 01:24:55,480 --> 01:24:59,080 to actually be able to grasp all of this, 861 01:24:59,120 --> 01:24:59,980 so many moving parts. 862 01:25:00,000 --> 01:25:26,180 That's the scale of it is so big. I think if we had a panel that could provide objective analysis, I'm not saying staff is an objective, but I think that is something that could build greater support for the project or greater clarity about the project. 863 01:25:26,180 --> 01:25:30,840 I mean, I don't want to make any assumptions here, but I really think that that's something 864 01:25:30,840 --> 01:25:39,100 that we should look at and that it would provide a benefit to the board and to the public. 865 01:25:40,000 --> 01:25:40,500 To the chair. 866 01:25:41,000 --> 01:25:45,660 Just want to mention, we do have a technical review board for the design elements, but I think 867 01:25:45,660 --> 01:25:51,400 you're talking more about the global picture of the project, the operations and environmental 868 01:25:51,400 --> 01:25:53,080 permitting, planning all that kind of stuff. 869 01:25:53,080 --> 01:25:56,180 but we do have a technical review board outside 870 01:25:56,180 --> 01:25:58,160 independent experts in different fields. 871 01:25:58,360 --> 01:26:00,960 Like we have on Anderson, it's not a requirement 872 01:26:00,960 --> 01:26:02,020 like it is on Anderson, 873 01:26:02,280 --> 01:26:03,320 so we don't have the FERC element. 874 01:26:03,680 --> 01:26:06,980 So it's actually our own piece we developed 875 01:26:06,980 --> 01:26:08,760 called our technical review board or TRB. 876 01:26:09,040 --> 01:26:12,520 Actually, I would say the design component 877 01:26:12,520 --> 01:26:15,380 to the project is the thing that I have the most confidence in. 878 01:26:16,560 --> 01:26:20,080 You're commented about kind of that bigger issue 879 01:26:20,080 --> 01:26:24,060 and what level of risk or the schedules 880 01:26:24,060 --> 01:26:27,240 where the decision points, I think that that's something 881 01:26:27,240 --> 01:26:28,720 we could use some external help. 882 01:26:28,860 --> 01:26:29,780 Thank you. 883 01:26:30,180 --> 01:26:32,160 No, thank you, Chair. 884 01:26:32,900 --> 01:26:36,380 Yeah, I think the article has a good suggestion. 885 01:26:37,340 --> 01:26:43,460 Then the board has recognized that we 886 01:26:43,460 --> 01:26:45,900 are evaluating many storage opportunities 887 01:26:45,900 --> 01:26:56,000 and then through that process, one or two opportunities will be selected as future 888 01:26:56,000 --> 01:27:05,340 capturing investment. And I remember could be wrong that here's the new property 889 01:27:05,900 --> 01:27:14,700 answering this question that you do have experts on the water supply, 890 01:27:14,700 --> 01:27:22,500 master plan. That is the panel. Remember this, there's this, there's this professor from 891 01:27:22,500 --> 01:27:32,400 UC Berkeley who did the who wrote the water version for some, I forgot the title, but I 892 01:27:32,400 --> 01:27:39,500 remember he is one of those experts that's on the panel, but they, that, the purpose of that, 893 01:27:39,500 --> 01:28:00,540 And I know it's to support all of us in looking at these big pictures that Director Keegan just mentioned that to make decision goes through the decision process to fine tune with our the opportunities to do for the future. 894 01:28:00,880 --> 01:28:01,260 Am I correct? 895 01:28:01,580 --> 01:28:02,420 Yes, that is correct. 896 01:28:02,540 --> 01:28:08,340 We have a panel and if we'd like me to mention all the names and titles, I'd be happy to. 897 01:28:08,340 --> 01:28:12,820 If you remember, you'll probably remember them very much. 898 01:28:13,020 --> 01:28:16,480 We have David Sunday, he's a professor with Berkeley. 899 01:28:17,020 --> 01:28:18,280 We have Nusa Jami. 900 01:28:18,440 --> 01:28:21,520 She is the Chief Development Officer for Research 901 01:28:21,520 --> 01:28:23,900 at the Lawrence Berkeley National Lab. 902 01:28:24,120 --> 01:28:26,900 She previously worked at Stanford as well 903 01:28:26,900 --> 01:28:29,920 and has been on prior panels for us. 904 01:28:30,300 --> 01:28:32,520 Michael Anderson, who's the state climatologist 905 01:28:32,520 --> 01:28:34,320 for the Department of Water Resources 906 01:28:34,320 --> 01:28:42,400 And Young Sing Sun, who has his own consulting firm, but he's been an expert in the field for a long time. 907 01:28:43,840 --> 01:28:44,840 Thank you. 908 01:28:45,180 --> 01:28:45,820 Anyone else? 909 01:28:45,820 --> 01:28:46,740 I hope, yeah. 910 01:28:47,600 --> 01:28:48,160 That's helpful. 911 01:28:49,240 --> 01:28:58,440 And we have, we do have regular meetings with them to, so that they review all or analysis through the using the water supply master plan. 912 01:28:58,740 --> 01:28:58,960 All right, correct? 913 01:29:00,060 --> 01:29:00,200 Okay. 914 01:29:00,200 --> 01:29:03,980 Yeah. Well, I think the water commission would be a pretty good example. 915 01:29:04,960 --> 01:29:07,740 The water company. Yeah. The game is the money. 916 01:29:08,060 --> 01:29:14,160 So we must think it's pretty good. Stay. Oh, yeah. Okay. Anybody else? 917 01:29:14,380 --> 01:29:21,280 Actually through the chair and response to that I just wanted to say my level of discomfort has to do 918 01:29:22,340 --> 01:29:29,500 and not so much with with technical issues it has to do with like I think we can come up with a good 919 01:30:00,000 --> 01:30:21,780 The number of things that can be challenged and like the issues associated with impacting a state park, the issues associated with so many things like change petitions where we have to get people to agree to make changes. 920 01:30:21,780 --> 01:30:26,800 all those things create uncertainty and 921 01:30:26,800 --> 01:30:30,000 and also create the opportunity for delay. 922 01:30:30,260 --> 01:30:33,660 That's why I think it needs to be a project management kind of person. 923 01:30:34,900 --> 01:30:37,960 So I see it as being an agent to the good work 924 01:30:37,960 --> 01:30:43,820 that is being done by the current folks working on the water supply master plan. 925 01:30:44,300 --> 01:30:47,780 But I think, I don't think their focus is so much on 926 01:30:47,780 --> 01:30:52,780 the nuts and bolts of what I'd like to see in response. Thank you. 927 01:30:54,020 --> 01:30:56,400 And can I add something to that to this comment? 928 01:30:57,080 --> 01:31:00,060 And I totally agree with what the Keegan said. 929 01:31:00,720 --> 01:31:15,160 And that's the, at least in my mind, that's the purpose of starting these series of more detailed discussion with the board on these kind of like nuts and bolts. 930 01:31:15,160 --> 01:31:24,100 Yeah. So, and then by the time we go through the water supply master plan that hopefully 931 01:31:24,100 --> 01:31:32,420 that what we learned from this more in-depth level discussion on particular project, 932 01:31:33,000 --> 01:31:40,280 your health and in decision making for the future investment on water supply, 933 01:31:40,280 --> 01:31:42,280 through the water supply management planning. 934 01:31:42,820 --> 01:31:53,320 Yeah. So I just want to also say that we're not the board hasn't made a decision to 935 01:31:53,320 --> 01:32:02,040 invest in any of these opportunities. We put money in multiple projects so that we don't kill any 936 01:32:02,040 --> 01:32:08,400 opportunity. We want to keep all these opportunities alive so that we have options. 937 01:32:08,400 --> 01:32:12,140 and then it's a process to form where we are, 938 01:32:12,440 --> 01:32:14,020 where we're having to, where we are now 939 01:32:14,020 --> 01:32:19,720 and then moving forward to the end and then we have a schedule, 940 01:32:20,040 --> 01:32:24,640 but then the schedule is a process. 941 01:32:25,500 --> 01:32:30,800 It's not like I'm doing a design and that's 30, 60, 90, 942 01:32:31,040 --> 01:32:35,480 and then I know pretty much when my 90% construction drawing 943 01:32:35,480 --> 01:32:36,300 will be ready. 944 01:32:36,300 --> 01:32:45,720 This is a lot of supply planning. It's more of a process and we do have a schedule, but then we need to realize that the schedule will change as we learn more as we learn more. 945 01:32:47,240 --> 01:32:57,620 And I want to thank staff for all the good work that's happening so all the process and then in past years. 946 01:32:57,620 --> 01:33:02,320 And sometimes I do get kind of a defensive about how some of these comments 947 01:33:02,320 --> 01:33:05,860 received that you have never really, my discolors to see information. 948 01:33:06,240 --> 01:33:11,160 I just find out about this information, but it's because it's a process. 949 01:33:11,380 --> 01:33:13,000 We didn't know about this information. 950 01:33:13,720 --> 01:33:16,580 As soon as staff know about the information, staff discolors to 951 01:33:16,580 --> 01:33:19,340 information and then discuss the information with us. 952 01:33:19,560 --> 01:33:24,320 And as we move forward, I think similar situation likely will happen too. 953 01:33:24,320 --> 01:33:33,500 So just want to make that clear and we're all in just together and thank you for everybody's participation. 954 01:33:35,780 --> 01:33:43,860 And that's why we have this meeting to ask all those questions and information so the board will be better prepared when it's asked to make a decision. 955 01:33:44,660 --> 01:33:48,900 Moving on, thank you all. Thank you, appreciate the discussion. Thank you Ryan, appreciate it. 956 01:33:49,520 --> 01:33:56,460 We're point four, review and discuss the water supply and the men management committee work plan. 957 01:33:57,160 --> 01:33:58,160 Is that definitely? 958 01:33:58,720 --> 01:34:00,800 I can speak on it very just very briefly. 959 01:34:01,060 --> 01:34:01,840 Thank you chair. 960 01:34:03,080 --> 01:34:06,880 I, in reviewing the work plan as the clerk. 961 01:34:08,040 --> 01:34:11,880 I noticed there were quite a few items on one month and not so. 962 01:34:12,240 --> 01:34:14,960 And I did work with staff to kind of rebalance the work plan. 963 01:34:14,960 --> 01:34:18,640 And I did mention it to you, Chair San Jose, and you said that was okay. 964 01:34:18,760 --> 01:34:19,560 So thank you so much. 965 01:34:19,600 --> 01:34:23,880 Just to kind of help the commission, I'm sorry, the committee utilized their time 966 01:34:23,880 --> 01:34:25,720 best and flow a little bit more. 967 01:34:25,860 --> 01:34:31,100 And obviously this is subject to change, but that is my comment for. 968 01:34:31,480 --> 01:34:37,160 Will be a new year doing a great job, appreciate it, appreciate the communication with me in the comments. 969 01:34:37,500 --> 01:34:41,680 Before we go to the public comments. 970 01:34:42,680 --> 01:34:52,820 I know thank you chair. No online comments and no, no in person, but again, thank you to the staff so much for your support. I really really appreciate it. Thank you.