1 00:00:00,000 --> 00:00:29,000 I Katie, it's good to see you. 2 00:00:29,000 --> 00:00:39,000 I think we're just waiting for a quorum. We had a note from some of our members that they're stuck in traffic and may be up to 10 minutes. 3 00:00:59,000 --> 00:01:21,000 Thanks for the update. I'm just testing my audio. 4 00:01:21,000 --> 00:01:27,000 We can hear you. 5 00:01:27,000 --> 00:01:36,000 I call on the meeting of the Central Coast Community Energy Community Advisory Council to order. 6 00:01:36,000 --> 00:01:41,000 Clerk Bale, would you like to do a roll call? 7 00:01:41,000 --> 00:01:44,000 Thank you, Chair. 8 00:01:44,000 --> 00:01:48,000 Number one, is abstain. 9 00:01:48,000 --> 00:01:53,000 Domain. 10 00:01:53,000 --> 00:01:56,000 Violent. 11 00:01:56,000 --> 00:01:59,000 Domain host is abstain. 12 00:01:59,000 --> 00:02:01,000 It is abstain. 13 00:02:01,000 --> 00:02:07,000 Johnson is abstain, the clash. 14 00:02:07,000 --> 00:02:08,000 Absent. 15 00:02:08,000 --> 00:02:11,000 Morten. 16 00:02:11,000 --> 00:02:13,000 President. 17 00:02:13,000 --> 00:02:16,000 President. 18 00:02:16,000 --> 00:02:17,000 Statement. 19 00:02:17,000 --> 00:02:18,000 Here. 20 00:02:18,000 --> 00:02:20,000 To it's a bookie. 21 00:02:20,000 --> 00:02:21,000 Here. 22 00:02:21,000 --> 00:02:23,000 Vice your data. 23 00:02:23,000 --> 00:02:24,000 Here. 24 00:02:24,000 --> 00:02:34,000 We have a quote. 25 00:02:34,000 --> 00:02:36,000 Thank you very much. 26 00:02:36,000 --> 00:02:44,000 I'd like to invite everyone to stand with me and pledge the flag. 27 00:02:44,000 --> 00:03:02,000 Thank you. 28 00:03:02,000 --> 00:03:07,000 Do we have any corrections or additions to our agenda today? 29 00:03:07,000 --> 00:03:13,000 There has been a request to just jog things around. 30 00:03:13,000 --> 00:03:23,000 And move up our discussion on, which one was that? 31 00:03:23,000 --> 00:03:27,000 Catherine, that we're moving forward? 32 00:03:27,000 --> 00:03:29,000 The proposal, Chair. 33 00:03:29,000 --> 00:03:39,000 Sorry, is to move the work plan presentation before the CEO report, because we'll have an outside presenter. 34 00:03:39,000 --> 00:03:46,000 Item five, moving up before item four. 35 00:03:46,000 --> 00:03:55,000 Do we have any public comment on items not on our agenda today? 36 00:03:55,000 --> 00:03:58,000 No public comments, Chair. 37 00:03:58,000 --> 00:04:01,000 Thank you. 38 00:04:01,000 --> 00:04:08,000 Does anybody have want to pull anything off our consent calendar or make a motion to approve? 39 00:04:08,000 --> 00:04:23,000 Chair, I recommend we put the, I mean, since we put the first 140 pages of the agenda packet in the consent calendar, 40 00:04:23,000 --> 00:04:26,000 it's just put the whole thing in the consent calendar. 41 00:04:26,000 --> 00:04:27,000 We've done a lot quicker. 42 00:04:27,000 --> 00:04:28,000 Overruled. 43 00:04:28,000 --> 00:04:29,000 Okay. 44 00:04:29,000 --> 00:04:32,000 I moved accepting the consent calendar. 45 00:04:32,000 --> 00:04:33,000 We have a motion. 46 00:04:33,000 --> 00:04:34,000 Do we have a second? 47 00:04:34,000 --> 00:04:35,000 Second. 48 00:04:35,000 --> 00:04:36,000 Thank you. 49 00:04:37,000 --> 00:04:42,000 Do we need a roll call vote on that? 50 00:04:42,000 --> 00:04:45,000 Yes, that's a clerk file. 51 00:04:45,000 --> 00:04:48,000 Could you please do a roll call vote? 52 00:04:48,000 --> 00:04:50,000 Yes, thank you, Chair. 53 00:04:50,000 --> 00:04:51,000 Alan? 54 00:04:51,000 --> 00:04:52,000 Yes. 55 00:04:52,000 --> 00:04:53,000 Alan? 56 00:04:53,000 --> 00:04:55,000 I. 57 00:04:55,000 --> 00:04:57,000 Byron? 58 00:04:57,000 --> 00:04:59,000 I. 59 00:04:59,000 --> 00:05:01,000 Nicklish? 60 00:05:01,000 --> 00:05:02,000 I. 61 00:05:02,000 --> 00:05:03,000 Nathan? 62 00:05:03,000 --> 00:05:05,000 I. 63 00:05:05,000 --> 00:05:06,000 Thada? 64 00:05:06,000 --> 00:05:07,000 I. 65 00:05:07,000 --> 00:05:09,000 That, then? 66 00:05:09,000 --> 00:05:10,000 Yes. 67 00:05:10,000 --> 00:05:12,000 To it's a vote key? 68 00:05:12,000 --> 00:05:13,000 Yes. 69 00:05:13,000 --> 00:05:15,000 By strategist? 70 00:05:15,000 --> 00:05:16,000 Aye. 71 00:05:16,000 --> 00:05:17,000 Chair, Kate. 72 00:05:17,000 --> 00:05:18,000 Aye. 73 00:05:18,000 --> 00:05:24,000 So we will be moving then to the next item. 74 00:05:24,000 --> 00:05:27,000 Hmm. 75 00:05:27,000 --> 00:05:32,000 Is the work plan presentation item number five on our agenda? 76 00:05:32,000 --> 00:05:33,000 Yes. 77 00:05:33,000 --> 00:05:34,000 Thank you, Chair. 78 00:05:34,000 --> 00:05:50,000 So our presentation on the community advisory councils fiscal year 2023 24 work plan includes an overview and discussion on battery monitoring in support of residential load shifting. 79 00:05:50,000 --> 00:05:57,000 So with that, I would like to welcome Chris Cook, our director of energy programs to present this item. 80 00:05:57,000 --> 00:06:12,000 Can you hear me? 81 00:06:12,000 --> 00:06:15,000 Oh, that's better. 82 00:06:15,000 --> 00:06:16,000 Great. 83 00:06:16,000 --> 00:06:26,000 So as I mentioned, I am Chris Cook director of energy programs at 3C and this afternoon I will be giving a presentation on the demand response work plan. 84 00:06:26,000 --> 00:06:33,000 So at 3C our power for good has a three-tier approach. 85 00:06:33,000 --> 00:06:41,000 First we source clean renewable energy and then we utilize that clean and renewable energy for electrification programs. 86 00:06:41,000 --> 00:06:45,000 So later do ag building and transport. 87 00:06:45,000 --> 00:06:53,000 And then finally now we have a demand response element with load, shifting and shaving. 88 00:06:53,000 --> 00:06:59,000 So this presentation I will be giving an overview related to several components of demand response. 89 00:06:59,000 --> 00:07:05,000 First the need for battery storage demand response from a high level state perspective. 90 00:07:05,000 --> 00:07:11,000 Next status of 3C's battery storage demand response pilot project. 91 00:07:11,000 --> 00:07:16,000 Then next steps with battery storage and load shifting. 92 00:07:16,000 --> 00:07:26,000 And finally a presentation from texture that does platforming, that has a platform analyzing load shifting. 93 00:07:26,000 --> 00:07:29,000 So first from that high level state perspective. 94 00:07:29,000 --> 00:07:33,000 Kiso is the California Independent System Operators. 95 00:07:33,000 --> 00:07:41,000 And what they do is they manage the high voltage lines and also the a wholesale energy market. 96 00:07:41,000 --> 00:07:51,000 And so they look at it kind of from a state level perspective and you can go on their website and you can see what's happening real time with power throughout the kiso system. 97 00:07:51,000 --> 00:07:58,000 And this graph that you see on the screen right here I took from May 22nd so two weeks before today. 98 00:07:58,000 --> 00:08:02,000 I think is a good representation of what's happening right now. 99 00:08:02,000 --> 00:08:06,000 This is specific to renewables and the trends there. 100 00:08:06,000 --> 00:08:12,000 So the blue line that's wind and you can see there's some variation there it is a little bit intermittent. 101 00:08:12,000 --> 00:08:21,000 It's fluctuates from approximately 5,000 megawatts to 2000 megawatts but it's not necessarily time dependent. 102 00:08:21,000 --> 00:08:35,000 However when you look at solar that orange or yellow line that one added those red dash lines at 6am and 8pm as everybody knows right now that's approximately sunrise and sunset. 103 00:08:35,000 --> 00:08:48,000 Well before 6am you have no power being produced from solar and after 8pm you have no power also but in the middle of the day you have approximately 17,000 megawatts being produced from solar. 104 00:08:48,000 --> 00:08:58,000 So that's you know a significant part of our renewable energy being provided for the system. 105 00:08:58,000 --> 00:09:07,000 And what that means in terms of overall supply trends you can see the part and green here of the graph again I added those red dash lines for reference. 106 00:09:07,000 --> 00:09:23,000 You know the before 6am after 8pm you have that wind that's renewable but then the solar takes over in the midday and you see that abundance of renewable supply available with the solar and the wind combined. 107 00:09:23,000 --> 00:09:31,000 And in fact you can see on the graph it dips down it has a surplus slightly of power available. 108 00:09:31,000 --> 00:09:38,000 But then you look at the evening time where there's the peak in the day and the solar is going away. 109 00:09:38,000 --> 00:09:49,000 So you have more demand and you have less supply of solar and that's when they need to ramp up other generations sources such as gas or imports to be able to make up that difference. 110 00:09:49,000 --> 00:10:04,000 But there is also another component in there that light kind of tan tan brown at the bottom and you can see that is charging during that midday time when you have that renewable you have the lower cost energy. 111 00:10:04,000 --> 00:10:14,000 And then it's discharging at those peak times when you're more reliant on non renewables there's more demand there's more cost. 112 00:10:14,000 --> 00:10:28,000 So you're able to shift that load and this is one where you see that steep incline of the peak and the need for other generation sources that's been commonly referred to as the duck curve. 113 00:10:28,000 --> 00:10:41,000 And now we're actually hearing it being referred to as the canyon because there's so much solar midday and then having to adjust so quickly the canyon is now what people are referencing. 114 00:10:41,000 --> 00:10:55,000 Here's another view from Kisos website on May 22 from CO2 emissions standpoint you can see you know that's there's a direct correlation there where when the solar is is no longer available. 115 00:10:55,000 --> 00:11:02,000 The emissions go up with it imports and gases being now being used. 116 00:11:02,000 --> 00:11:16,000 And then from a price map perspective again from this website I just took from 3 p.m. and 5 p.m. just with those two time differences you can't really it's hard to see on this screen but the medium price. 117 00:11:16,000 --> 00:11:28,000 Tripled in those in that time between 3 and 5 p.m. and if you look at it at noon sometimes it can go negative in price and then you look at it in the evening it can get significantly higher. 118 00:11:28,000 --> 00:11:41,000 So you can have that energy arbitrage where if you have a battery system what you can do is actually at certain situations midday you could be paid to charge the battery and then be paid significantly higher to discharge it. 119 00:11:41,000 --> 00:11:47,000 So there's a price benefit along with the renewables and other aspects. 120 00:11:47,000 --> 00:12:07,000 So as as I mentioned load shifting the shifting of load with battery storage has multiple benefits using cleaner power lower costs for everyone and more reliability for the grid and resiliency for customers if they are say a PSPS PG and he event there's an outage. 121 00:12:07,000 --> 00:12:21,000 They also have that battery and a commercial or residential or other location to be able to use this backup. So there's still a clear need for more battery storage. 122 00:12:21,000 --> 00:12:36,000 In terms of our own demand response pilot we had an RFP that was sent out we got four proposals back for respondents. Two of those we took forward with interviews one was demand response providers. 123 00:12:36,000 --> 00:12:49,000 DRPs were enrolled to be enrolled in a marketplace pricing platform so being able to pull on demand response providers when needed in this in this marketplace platform. 124 00:12:49,000 --> 00:13:03,000 And then another was behind the meter virtual power plant with incentive plants so this is more of a battery storage concept with being able to activate discharge charge at various times and incentivizing. 125 00:13:03,000 --> 00:13:16,000 For the panel it was made up of six staff of 3C from four different departments and overall it had a conclusion that these proposals all had clear drawbacks. 126 00:13:16,000 --> 00:13:34,000 So one of those was that was that looking at the cost of of the different pilots a lot of cases the cost of the pilots didn't necessarily outweigh the cost to the customer didn't necessarily outweigh the benefits of the pilot itself. 127 00:13:34,000 --> 00:13:49,000 And then for the battery storage ones there was limitations in terms of say a single battery manufacturer being able to be used so having potential participation limits related to. 128 00:13:49,000 --> 00:13:55,000 No different battery manufacturers and that could limit customer participation too. 129 00:13:55,000 --> 00:14:01,000 And then in terms of demand response itself it would be hard to validate that there's not double counting. 130 00:14:01,000 --> 00:14:07,000 So what that could mean is if kisos relying on a certain demand response. 131 00:14:07,000 --> 00:14:23,000 Low say a load shifting from the grid and that's not able to be achieved well then you know they have to be curtailments or other things happen to be able to make that happens we have to have assurance that what we're saying we're going to do we can provide to be able to meet the needs. 132 00:14:24,000 --> 00:14:35,000 But at the same time as mentioned before there's really clear benefits of demand response particularly as they relate to battery storage with all the benefits that we talked about so. 133 00:14:35,000 --> 00:15:00,000 So we do feel that it's important to keep pursuing this and and realize the the demand that demand response pilot so what we're going to be doing to further this is we're looking to refine the demand response pilot RFP scope so this will ensure that the proposals we get in are comparable we can have competitive. 134 00:15:00,000 --> 00:15:10,000 And then also that the scope is one where every proposal, if it meets the scope, would meet grid and customer needs. 135 00:15:10,000 --> 00:15:24,000 And then to help refine this RFP scope, we're launching a new battery rebate program, allowing staff to further analyze battery storage for load shifting. 136 00:15:24,000 --> 00:15:34,000 So this battery rebate program, this is one that would be focused on load shifting with residential customer rebates. 137 00:15:34,000 --> 00:15:42,000 And then for that, what we would be doing is we would be discharging at least 50% of the battery during peak hours. 138 00:15:42,000 --> 00:15:49,000 So really making sure that those batteries discharge and shift load during the critical times when it's needed. 139 00:15:49,000 --> 00:16:00,000 And that will allow us to realize a lot of the benefits that are there, but also track the load being shifted. 140 00:16:00,000 --> 00:16:05,000 And that provides a number of ways for potential analysis for us moving forward. 141 00:16:05,000 --> 00:16:10,000 We can look at participation rates with this battery rebate program. 142 00:16:10,000 --> 00:16:17,000 We can see specifically for low income what the reach is there, how we're doing with that customer base. 143 00:16:17,000 --> 00:16:26,000 We can see incentive methods, if front end rebates versus long term incentives, whether front end rebates can drive the participation rates. 144 00:16:26,000 --> 00:16:42,000 And then looking at overall load shifting impact, if we can get a good start with a battery rebate program in terms of load shifting, being able to have a sense of how that could six scale and the overall benefits that could be achieved. 145 00:16:42,000 --> 00:16:59,000 So with that, looking specifically at the load shifting impact, we did invite texture to speak, they have a platform that can track energy systems and in our case, you know, looking at batteries and load shifting and being able to quantify that. 146 00:16:59,000 --> 00:17:06,000 So with that, I'd like to pass it over to Eric and maybe Nicholas with texture. 147 00:17:07,000 --> 00:17:12,000 Thanks Chris, I could have to do everyone, I appreciate the introduction. 148 00:17:12,000 --> 00:17:16,000 My name is Eric Roth, I worked at a company called texture. 149 00:17:16,000 --> 00:17:21,000 Our kind of platform is really focused on data infrastructure. 150 00:17:21,000 --> 00:17:27,000 So just by way of background, on the head of business development and texture, 151 00:17:27,000 --> 00:17:31,000 I could make unfortunately the two thoughts that could make it tonight. 152 00:17:31,000 --> 00:17:33,000 But he sends a few words. 153 00:17:33,000 --> 00:17:42,000 My background just before we move on, I've been energy about 10 years, actually started as an attorney and all kind of focused on the demand side. 154 00:17:42,000 --> 00:17:47,000 And for the last seven kind of been focused on technology that can help. 155 00:17:47,000 --> 00:17:53,000 Both customers and companies understand their energy usage more thoroughly and that's what texture comes in. 156 00:17:53,000 --> 00:17:58,000 So pushing to the next slide, what we do is pretty simple. 157 00:17:58,000 --> 00:18:05,000 The mission of our company, if you go to the next slide, is we help energy companies be more data driven. 158 00:18:05,000 --> 00:18:17,000 And that includes installers of assets that include companies who manage assets and then of course utilities and folks like PC. 159 00:18:17,000 --> 00:18:26,000 So we met 3C and Chris about two months ago when he was considering this program and we've been in conversation sense. 160 00:18:26,000 --> 00:18:30,000 So very honored and pleased to present what we do, just a couple slides. 161 00:18:30,000 --> 00:18:34,000 If you move to the next slide, what we do is pretty simple. 162 00:18:34,000 --> 00:18:38,000 We're a platform to view and track your energy network. 163 00:18:38,000 --> 00:18:46,000 And so what that means is we have a platform that looks like a platform you can engage with where you can view. 164 00:18:46,000 --> 00:18:50,000 Individual homeowners and once they give permission. 165 00:18:50,000 --> 00:18:57,000 To connect whatever DER they might have whether it's an electric vehicle, a thermostat, solar inverter or a battery. 166 00:18:57,000 --> 00:19:00,000 You can view that asset in real time. 167 00:19:00,000 --> 00:19:03,000 You can understand whether it's plugged in, whether it's charging. 168 00:19:03,000 --> 00:19:08,000 If a battery, you can understand whether it's just actually any whether it's story. 169 00:19:08,000 --> 00:19:10,000 I thought it was that you can understand set points. 170 00:19:10,000 --> 00:19:16,000 And the idea is that organizations like 3C and others are able to view. 171 00:19:16,000 --> 00:19:21,000 All of the customers understand very specifically that assets and DERs they have in their home. 172 00:19:21,000 --> 00:19:30,000 And understand the real time implications of those assets, whether it's an EV or a battery. 173 00:19:30,000 --> 00:19:36,000 And all of this is powered by the end user, the homeowners permission. 174 00:19:36,000 --> 00:19:39,000 So if you go to the next slide. 175 00:19:39,000 --> 00:19:42,000 So what we are is a data platform. 176 00:19:42,000 --> 00:19:46,000 What we're not is a demand response company or a VPP. 177 00:19:46,000 --> 00:19:52,000 So we don't compete with companies like own connect or see power or voltage. 178 00:19:52,000 --> 00:19:56,000 Somebody's demand response companies that actually may have responded to the RFP. 179 00:19:56,000 --> 00:20:05,000 We're truly an diagnostic data platform that just allows the data to flow and be visualized on our platform. 180 00:20:05,000 --> 00:20:07,000 We also don't monetize the patient. 181 00:20:07,000 --> 00:20:11,000 So we don't charge based on connecting the device. 182 00:20:11,000 --> 00:20:16,000 Charge based on a traditional software model of a platform fee. 183 00:20:16,000 --> 00:20:18,000 We also don't build product in applications. 184 00:20:18,000 --> 00:20:24,000 And so what our customers do or the end user does with the battery, for example, is totally up to them. 185 00:20:24,000 --> 00:20:29,000 We don't have any perspective or interpretation of when a battery should discharge or store. 186 00:20:29,000 --> 00:20:33,000 That's entirely up to our companies and the end users. 187 00:20:36,000 --> 00:20:40,000 And so just to give you a sense of what the platform looks like. 188 00:20:40,000 --> 00:20:43,000 This is kind of what our customers see. 189 00:20:43,000 --> 00:20:49,000 So this gives you an opportunity to view all of the customers that have connected with the battery. 190 00:20:49,000 --> 00:20:53,000 Understand very specifically they're addressed when they added the battery. 191 00:20:53,000 --> 00:20:58,000 Kind of consumption of the battery production of a solar storage or solar area unit. 192 00:20:58,000 --> 00:21:02,000 For example, or of course the battery production. 193 00:21:02,000 --> 00:21:08,000 And if you look on the right, you can kind of click into the specific address or site as we call it. 194 00:21:08,000 --> 00:21:11,000 And understand very specifically the utility. 195 00:21:11,000 --> 00:21:13,000 But also market. 196 00:21:13,000 --> 00:21:18,000 And we can't marry that information with energy consumption and storage. 197 00:21:18,000 --> 00:21:19,000 Data. 198 00:21:19,000 --> 00:21:24,000 We also marry that with emissions data that we kind of put on the platform for our customers to understand. 199 00:21:24,000 --> 00:21:27,000 The initial impact of contaminant. 200 00:21:27,000 --> 00:21:31,000 And that allows our customers to view individual sites. 201 00:21:31,000 --> 00:21:34,000 You can go to the next slide. 202 00:21:34,000 --> 00:21:35,000 So the really do this. 203 00:21:35,000 --> 00:21:37,000 It's a pretty simple process. 204 00:21:37,000 --> 00:21:44,000 All of our customers rely on the end user or the homeowner to actually get permission and allow the data to flow. 205 00:21:44,000 --> 00:21:48,000 And so once a customer of ours has connected. 206 00:21:48,000 --> 00:21:50,000 An interface battery. 207 00:21:50,000 --> 00:21:57,000 The data will flow, but the connection process is a pretty simple process where if they've installed an interface battery. 208 00:21:57,000 --> 00:22:00,000 And our customers send them an email link. 209 00:22:00,000 --> 00:22:03,000 And then they go through this connect flow. 210 00:22:03,000 --> 00:22:06,000 And all they do is to put a simple information. 211 00:22:06,000 --> 00:22:07,000 It's your address. 212 00:22:07,000 --> 00:22:09,000 It's what is your specific battery. 213 00:22:09,000 --> 00:22:12,000 So whether it's in phase or solar edge or Franklin. 214 00:22:12,000 --> 00:22:15,000 And then they slide into their existing account. 215 00:22:15,000 --> 00:22:18,000 And they give us permission to view the data in real time. 216 00:22:18,000 --> 00:22:21,000 And that's it. 217 00:22:21,000 --> 00:22:24,000 And so what that actually looks like on the platform. 218 00:22:24,000 --> 00:22:26,000 This is an example of a battery view. 219 00:22:26,000 --> 00:22:28,000 And this is an example customer. 220 00:22:28,000 --> 00:22:30,000 You can see again. 221 00:22:30,000 --> 00:22:32,000 Very specifically. 222 00:22:32,000 --> 00:22:35,000 Customer information in terms of home address. 223 00:22:35,000 --> 00:22:38,000 Email where they're located on the grid. 224 00:22:38,000 --> 00:22:42,000 You can see what devices they can permission to view on our platform. 225 00:22:42,000 --> 00:22:48,000 And then on the right, you're able to understand and track battery storage and dispatch. 226 00:22:48,000 --> 00:22:51,000 So the bottom right and kind of the grade. 227 00:22:52,000 --> 00:22:55,000 Orc is a little bit of a Christmas speaking about this. 228 00:22:55,000 --> 00:22:56,000 The battery. 229 00:22:56,000 --> 00:23:00,000 Stories throughout the day and then discharge is at night. 230 00:23:00,000 --> 00:23:01,000 And so. 231 00:23:01,000 --> 00:23:06,000 It, you know, as the day goes on, the battery storage more and then the amount of a discharge at night. 232 00:23:06,000 --> 00:23:08,000 And you can track that. 233 00:23:08,000 --> 00:23:12,000 And if the goal of the platform is really to allow our customers to see this. 234 00:23:12,000 --> 00:23:14,000 Individual, but also. 235 00:23:14,000 --> 00:23:15,000 Company why. 236 00:23:15,000 --> 00:23:19,000 And so you can use our platform to view analytics. 237 00:23:19,000 --> 00:23:22,000 Do you analytics not just individual customers, but you're an entire number? 238 00:23:28,000 --> 00:23:29,000 That's all. 239 00:23:29,000 --> 00:23:30,000 Please strike more platform. 240 00:23:30,000 --> 00:23:34,000 I have to answer any questions, but I'd appreciate the opportunity. 241 00:23:34,000 --> 00:23:35,000 Great. 242 00:23:35,000 --> 00:23:36,000 Thank you, Eric. 243 00:23:36,000 --> 00:23:38,000 And you've got... 244 00:23:38,000 --> 00:23:41,000 With that, we're to our recommendations. 245 00:23:41,000 --> 00:23:46,000 So this memorandum provides the CAC overview of three C's, 246 00:23:46,000 --> 00:23:49,000 fiscal year 2023, 2024 work plan, 247 00:23:49,000 --> 00:23:54,000 the presentation on battery monitoring and supportive residential load shifting. 248 00:23:54,000 --> 00:23:55,000 So... 249 00:23:55,000 --> 00:23:56,000 Thank you. 250 00:23:59,000 --> 00:24:00,000 Thank you. 251 00:24:00,000 --> 00:24:03,000 Open it up to questions from the council. 252 00:24:05,000 --> 00:24:06,000 Lou? 253 00:24:07,000 --> 00:24:08,000 Thank you. 254 00:24:08,000 --> 00:24:09,000 Thank you. 255 00:24:09,000 --> 00:24:11,000 Thank you for the presentation, Chris. 256 00:24:11,000 --> 00:24:14,000 Just so I understand this idea would be that the residents 257 00:24:14,000 --> 00:24:17,000 would have lithium batteries in their homes, 258 00:24:17,000 --> 00:24:20,000 and they would sell back to the grid. 259 00:24:20,000 --> 00:24:23,000 Have you considered centralizing, would it make more sense, 260 00:24:23,000 --> 00:24:28,000 to centralize and have a battery farms, maybe in crystal planes, 261 00:24:28,000 --> 00:24:32,000 near the topest solar plant, or something similar to that, 262 00:24:32,000 --> 00:24:37,000 where you could bond the capital costs, 263 00:24:37,000 --> 00:24:42,000 based on the pricing differential between daytime and nighttime. 264 00:24:43,000 --> 00:24:47,000 Versus decentralized, where you'd have less control. 265 00:24:49,000 --> 00:24:51,000 Thank you, Dr. Ballman. 266 00:24:51,000 --> 00:24:55,000 It is the exact right question, and on the power supply space, 267 00:24:55,000 --> 00:24:57,000 that is exactly what we're doing. 268 00:24:57,000 --> 00:24:59,000 So we just did an RFO. 269 00:24:59,000 --> 00:25:01,000 We'll mention it in a moment here, 270 00:25:01,000 --> 00:25:05,000 where we've solicited developer proposals 271 00:25:05,000 --> 00:25:08,000 for energy storage and generation, 272 00:25:08,000 --> 00:25:11,000 but that larger scale sort of bang for your buck opportunity 273 00:25:11,000 --> 00:25:16,000 to whether it is utilize that battery for its capacity. 274 00:25:16,000 --> 00:25:18,000 It's a resource adequacy, 275 00:25:18,000 --> 00:25:23,000 or to arbitrage the energy cost of low energy 276 00:25:23,000 --> 00:25:25,000 dollars in the morning. 277 00:25:25,000 --> 00:25:30,000 That's more of a power supply effort that's done in front of the meter. 278 00:25:30,000 --> 00:25:34,000 The effort here with the demand response is less about meeting 279 00:25:34,000 --> 00:25:37,000 or load serving entity requirements, 280 00:25:37,000 --> 00:25:40,000 but empowering individual customers to be able 281 00:25:40,000 --> 00:25:43,000 to control their own consumption and energy usage, 282 00:25:43,000 --> 00:25:47,000 that we'll have a benefit in the overall grid area, 283 00:25:47,000 --> 00:25:50,000 but very much at the margins, 284 00:25:50,000 --> 00:25:54,000 not at the scale that front of the meter can do, 285 00:25:54,000 --> 00:25:56,000 or frankly at the price point, 286 00:25:56,000 --> 00:25:59,000 which is one of the reasons that the recommendation was 287 00:25:59,000 --> 00:26:05,000 not to move forward with one of the A proposal from the RFP we ran, 288 00:26:05,000 --> 00:26:10,000 because it's not cost effective at this point to do so. 289 00:26:10,000 --> 00:26:12,000 And Chris, I'll let you follow up on this, 290 00:26:12,000 --> 00:26:18,000 but I think what the proposal is is pair of residential demand, 291 00:26:18,000 --> 00:26:21,000 or residential battery incentive program, 292 00:26:21,000 --> 00:26:24,000 which we'll talk about under a different item, 293 00:26:24,000 --> 00:26:27,000 with the learning opportunity that texture provides. 294 00:26:27,000 --> 00:26:29,000 For those that don't know, 295 00:26:29,000 --> 00:26:32,000 we currently rely on the IOUs, 296 00:26:32,000 --> 00:26:38,000 to provide us metering and customer management services. 297 00:26:38,000 --> 00:26:41,000 So we get data only through the IOUs, 298 00:26:41,000 --> 00:26:45,000 and only on interval basis and not in a real time basis. 299 00:26:45,000 --> 00:26:48,000 Getting the opportunity at a customer election, 300 00:26:48,000 --> 00:26:51,000 so you are going slowly customer by customer 301 00:26:51,000 --> 00:26:56,000 to see how customers are using and consuming energy in real time, 302 00:26:56,000 --> 00:27:01,000 is light years ahead of where we currently are with the IOUs. 303 00:27:01,000 --> 00:27:05,000 And then that learning helps us to inform how can we design 304 00:27:05,000 --> 00:27:08,000 a demand response program that can be cost effective. 305 00:27:08,000 --> 00:27:12,000 So that's the longer term goal with what we want to accomplish. 306 00:27:12,000 --> 00:27:15,000 And Chris, happy to fill you out onto that. 307 00:27:15,000 --> 00:27:17,000 Yeah, I think you said it well. Thank you. 308 00:27:25,000 --> 00:27:27,000 Yeah, I was curious too, 309 00:27:27,000 --> 00:27:30,000 if you've rolled this out in another area of community 310 00:27:30,000 --> 00:27:34,000 and kind of what problems you ran into or successes that you've had with that too. 311 00:27:34,000 --> 00:27:37,000 Because I would think that would have to be bundled with the rebate 312 00:27:37,000 --> 00:27:41,000 or the battery backup because you're relying on the end user 313 00:27:41,000 --> 00:27:43,000 to enroll themselves. 314 00:27:43,000 --> 00:27:46,000 And I think there's already kind of maybe an uncomfortableness 315 00:27:46,000 --> 00:27:48,000 with releasing that information. 316 00:27:48,000 --> 00:27:50,000 So the incentive would be the battery rebate 317 00:27:50,000 --> 00:27:53,000 coupled with obviously the enrollment into the program. 318 00:27:53,000 --> 00:27:56,000 But I did know texture had seen something like this 319 00:27:56,000 --> 00:27:58,000 in another community. 320 00:27:58,000 --> 00:28:01,000 You know, in another region of the country, 321 00:28:01,000 --> 00:28:04,000 if you could speak to that, that would be great. 322 00:28:04,000 --> 00:28:07,000 Yeah, great question. 323 00:28:07,000 --> 00:28:12,000 We haven't engaged specifically with another program with these parameters 324 00:28:12,000 --> 00:28:14,000 in other parts of the country. 325 00:28:14,000 --> 00:28:23,000 The way we tend to work is customers with a lot of themselves, 326 00:28:23,000 --> 00:28:33,000 and so we rely on our customers and companies to actually do the marketing. 327 00:28:33,000 --> 00:28:36,000 So that would be up to 3CE in this case. 328 00:28:36,000 --> 00:28:37,000 Yeah. 329 00:28:37,000 --> 00:28:42,000 And I would add that the front end rebate is a model that's been done 330 00:28:42,000 --> 00:28:46,000 by other CCAs that we've seen and they have gotten participation in it. 331 00:28:46,000 --> 00:28:50,000 And one of the things we'll be looking at is ensuring that they enroll 332 00:28:50,000 --> 00:28:56,000 in a load shift tracking platform before the rebate is given, 333 00:28:56,000 --> 00:28:59,000 because it's really important to us to be able to have that information 334 00:28:59,000 --> 00:29:03,000 to quantify and refine what we're doing. 335 00:29:03,000 --> 00:29:07,000 And just real quick, so that would be demand response 336 00:29:07,000 --> 00:29:09,000 would also be included in that as well. 337 00:29:09,000 --> 00:29:12,000 So demand response, then the data management, 338 00:29:12,000 --> 00:29:16,000 and then the battery rebate, would it all be together? 339 00:29:16,000 --> 00:29:22,000 Yeah, so what I would say is, so the battery rebate program is a separate program 340 00:29:22,000 --> 00:29:27,000 that we'll be presenting on, but it's used to refine for our demand response pilot 341 00:29:27,000 --> 00:29:28,000 that we'll be doing. 342 00:29:28,000 --> 00:29:31,000 So when we do a future demand response pilot, 343 00:29:31,000 --> 00:29:35,000 we'll absolutely be tracking any load shifting or other things that happen. 344 00:29:35,000 --> 00:29:40,000 But the battery rebate program is kind of its own standalone load 345 00:29:40,000 --> 00:29:45,000 shifting with tracking, so we would be doing that with a future demand response 346 00:29:45,000 --> 00:29:48,000 pilot we'd have to be able to do, like we mentioned, 347 00:29:48,000 --> 00:29:52,000 ensure that we're not double counting our demand response and other aspects 348 00:29:52,000 --> 00:29:55,000 that we want to make sure we're accurately tracking. 349 00:29:55,000 --> 00:29:59,000 But for now, it's more with the actual battery rebate program. 350 00:29:59,000 --> 00:30:00,000 If that makes... 351 00:30:00,000 --> 00:30:22,000 And if I could also add that, you know, in speaking with other CCAs that have run demand response programs, where they have direct control of batteries and in our research, what we found is that the customer reticenses really about giving over control of that battery. 352 00:30:22,000 --> 00:30:38,000 But just in terms of tracking the use, I think there's much more receptivity, especially if it is tied to the incentive of helping to pay for the purchase and installation of the battery. 353 00:30:38,000 --> 00:30:42,000 So it would be end phase batteries only. Is that right? 354 00:30:42,000 --> 00:30:52,000 Does that, because the technology with those different reporting capabilities of the different batteries, I know it's changing it like light speed. 355 00:30:52,000 --> 00:30:58,000 Yeah, and I didn't know if there were going to be other battery manufacturers that would be a part of it to just from a cost standpoint. 356 00:30:58,000 --> 00:31:07,000 I don't know, Eric, if you wanted to speak to the availability of safe telemetry on battery storage and how you work with the manufacturers. 357 00:31:07,000 --> 00:31:09,000 Yeah, great question. 358 00:31:09,000 --> 00:31:23,000 We are advice agnostic. So we're able to integrate with kind of a reading, no VMs, we worked with some of folks on three CE to identify what those are in the service territory. 359 00:31:23,000 --> 00:31:31,000 We claim we are integrated with n-phase test solar edG, which tends to be kind of it's an 8020 in batteries. 360 00:31:31,000 --> 00:31:41,000 But that tend to be the reading manufacturers, our platform, we don't reverse engineer any of these connections we work directly with manufacturers. 361 00:31:41,000 --> 00:31:49,000 So those are the top we integrate with today, but we're very open to integrated with more future. 362 00:31:49,000 --> 00:32:01,000 And one comment about probably necessarily apologize, but other CCAs doing this. We've had conversations with leaning on that, not sure if familiar with that. 363 00:32:01,000 --> 00:32:08,000 That organization that would be executive director last week to kind of talk about this type of monitoring for other CCAs. 364 00:32:08,000 --> 00:32:15,000 So other folks are thinking about it, but haven't we haven't implemented a program like this yet, but it is out there. 365 00:32:19,000 --> 00:32:35,000 And if I just want to stress the importance of what Eric was just sharing that technology or device agnostic stance, one of the challenges in the RFP proposal is that they are very device oriented. 366 00:32:35,000 --> 00:32:40,000 So they have there preferred technology that they work with. 367 00:32:40,000 --> 00:32:48,000 That limits the number of batteries that solar installers can work with. So from an installer standpoint, it's very limiting. 368 00:32:48,000 --> 00:32:58,000 Whether they could utilize our proposed battery program effectively, because they have their deals in place and their supply contracts in place. 369 00:32:58,000 --> 00:33:09,000 The ability to work across multiple platforms, even if it's not 100% of every platform that's going to be utilized, is a really significant development 370 00:33:09,000 --> 00:33:15,000 that texture adds that a lot of other monitoring areas are still trying to catch up to. 371 00:33:15,000 --> 00:33:32,000 But it's really significant because it's allowing customers to make decisions about what technology they want to utilize, what installer they want to utilize, and it doesn't limit what they're going to be utilizing. 372 00:33:32,000 --> 00:33:35,000 Council Member Johnson. 373 00:33:35,000 --> 00:33:41,000 Thank you, sir. We really, traffic was terrible. 374 00:33:41,000 --> 00:33:46,000 Light years ahead, this kind of data collection, light years ahead, you said. 375 00:33:46,000 --> 00:33:52,000 Mr. Shaw, do we have to share the data with PG&E? 376 00:33:53,000 --> 00:33:58,000 Technically, PG&E will have the data, because, again, they are building in customer agent. 377 00:33:58,000 --> 00:34:05,000 So I would consider PG&E a partner as we move forward in anything that we're going to be doing. 378 00:34:05,000 --> 00:34:13,000 But if we were to get to that step, we'd have to have some discussions about how we're going to do that, but we have all shared customers in PG&E has the data. 379 00:34:13,000 --> 00:34:23,000 They won't have access to the unique user interface that texture might add, but PG&E has more data access than we do. 380 00:34:23,000 --> 00:34:37,000 And would you anticipate after reviewing and analyzing the data that's collected and lessons learned regarding how we may design and refine our demand response programs in the future? 381 00:34:37,000 --> 00:34:41,000 Would you anticipate we would share those with other CCAs? 382 00:34:41,000 --> 00:34:44,000 There's lessons learned, I should say. 383 00:34:44,000 --> 00:34:54,000 I would say that the CCAs are very much a collaborative environment where we're constantly looking at the innovations of each other and then seeing how we can improve upon them. 384 00:34:54,000 --> 00:34:57,000 So, absolutely, we'd be sharing that information. 385 00:34:57,000 --> 00:35:04,000 The other thing that we'll be monitoring very closely is the success of the existing demand response programs. 386 00:35:04,000 --> 00:35:08,000 There are programs out there that a lot of customers are utilizing. 387 00:35:08,000 --> 00:35:10,000 The commission is put in place. 388 00:35:10,000 --> 00:35:12,000 We've made available to our customers. 389 00:35:12,000 --> 00:35:17,000 So they're not branded 3CE programs, but they're there in their effective. 390 00:35:17,000 --> 00:35:20,000 And we want to see how that develops over the next few years. 391 00:35:20,000 --> 00:35:29,000 And when last question, at what juncture we launched this with texture, at what juncture do we look back and say, 392 00:35:29,000 --> 00:35:33,000 And of course we're going to analyze the data, but we look back and see this is effective. 393 00:35:33,000 --> 00:35:34,000 This is helping. 394 00:35:34,000 --> 00:35:37,000 Do we have a time frame in mind for that? 395 00:35:37,000 --> 00:35:40,000 I know we have a contact, I anticipate a contract. 396 00:35:40,000 --> 00:35:42,000 Time frame, I'm sure. 397 00:35:42,000 --> 00:35:54,000 Yes, with that one, we're looking at the first six months of the program launch to go back and re-evaluate or the first 500,000 in rebates given. 398 00:35:54,000 --> 00:35:59,000 Whichever one comes first, we go back and evaluate and that's in our next presentation. 399 00:35:59,000 --> 00:36:06,000 And one of the big focuses that too will be just income qualified customers, making sure we're reaching out to them effectively. 400 00:36:06,000 --> 00:36:10,000 But the whole tracking will be part of that also. 401 00:36:10,000 --> 00:36:11,000 Thank you. 402 00:36:11,000 --> 00:36:16,000 Council Member Byron. 403 00:36:16,000 --> 00:36:17,000 Chair, thank you. 404 00:36:17,000 --> 00:36:19,000 Thank you very much. 405 00:36:20,000 --> 00:36:25,000 I was going to try and keep it to two, but I think the first one is just a yes or no question. 406 00:36:25,000 --> 00:36:27,000 I may have missed this. 407 00:36:27,000 --> 00:36:34,000 This new energy storage program, rebate program, is it integrated with PV? 408 00:36:34,000 --> 00:36:39,000 Because I mean, are we encouraging people to put in batteries without photovoltaics or. 409 00:36:39,000 --> 00:36:42,000 Yes, so that'll be in the next presentation. 410 00:36:42,000 --> 00:36:50,000 We actually have a rebate incentive for somebody say who's. 411 00:36:50,000 --> 00:36:58,000 Doesn't have solar or get solar at the time of the battery versus somebody who already has solar, maybe they're an M1.0 or 2.0 customer in the switch over to. 412 00:36:58,000 --> 00:37:03,000 MBT, you know, they get an additional. 413 00:37:03,000 --> 00:37:05,000 Re-bate with with that. 414 00:37:05,000 --> 00:37:06,000 Yeah, I'm just trying to understand. 415 00:37:06,000 --> 00:37:09,000 Are we encouraging people to just put in batteries with this program? 416 00:37:09,000 --> 00:37:11,000 They, they can without solar. 417 00:37:11,000 --> 00:37:21,000 Yes, that is an option, but the solar is definitely one where it would be part of it and a lot of our outreach will be kind of focused in that knowing that people with solar. 418 00:37:21,000 --> 00:37:22,000 So you actually. 419 00:37:22,000 --> 00:37:23,000 Please. 420 00:37:23,000 --> 00:37:28,000 These are another question, and this is a little bit out of the order I was going to ask, but. 421 00:37:28,000 --> 00:37:33,000 You know, the former CEO of this organization, I had a conversation with him years ago. 422 00:37:33,000 --> 00:37:36,000 I don't remember his name. 423 00:37:36,000 --> 00:37:40,000 And he said something to me that was just, you know, you just don't say this. 424 00:37:40,000 --> 00:37:42,000 We're going to go to 100% renewables. 425 00:37:42,000 --> 00:37:46,000 Why do we need to worry about energy efficiency and demand response? 426 00:37:46,000 --> 00:37:49,000 And of course, when you work at the energy commission, you drink the cool aid. 427 00:37:49,000 --> 00:37:53,000 I mean, those are those are the loading order. 428 00:37:53,000 --> 00:37:55,000 So why are we worrying about this? 429 00:37:55,000 --> 00:37:57,000 What's the real purpose here? 430 00:37:57,000 --> 00:38:00,000 Are we are we under some RA obligation that we have to meet? 431 00:38:00,000 --> 00:38:02,000 Are we just trying to be good citizens? 432 00:38:02,000 --> 00:38:03,000 Don't give me wrong. 433 00:38:03,000 --> 00:38:06,000 That's, those are good, those are good reasons. 434 00:38:06,000 --> 00:38:07,000 But why are we doing this? 435 00:38:07,000 --> 00:38:09,000 We're spending money on DR. 436 00:38:09,000 --> 00:38:14,000 Maybe when we get to 100% renewable, we don't want to restrict how much energy people use. 437 00:38:14,000 --> 00:38:17,000 As long as it's renewables and efficient. 438 00:38:17,000 --> 00:38:19,000 Why, why would we worry about all this? 439 00:38:19,000 --> 00:38:21,000 So it's kind of a long term question. 440 00:38:21,000 --> 00:38:26,000 Are we doing this because there's something requirement of imposed upon us to do it? 441 00:38:27,000 --> 00:38:36,000 So from a strategy standpoint, I think staff have tried to make this clear through the number of presentations we've had. 442 00:38:36,000 --> 00:38:38,000 But this comes down to two things. 443 00:38:38,000 --> 00:38:43,000 There is no requirement from the CPUC or otherwise. 444 00:38:43,000 --> 00:38:48,000 But there is I think the direction from the policy for that we want to encourage battery storage. 445 00:38:48,000 --> 00:38:51,000 Because it helps further our climate goals. 446 00:38:51,000 --> 00:39:02,000 So giving customers the ability to control their energy consumption to be a part of the reliability solution allows customers to help manage some of their cost. 447 00:39:02,000 --> 00:39:08,000 It's going to help in at the margins around those net peak hours. 448 00:39:08,000 --> 00:39:13,000 So we can be a 100% renewable, but renewable is still intermittent. 449 00:39:13,000 --> 00:39:19,000 So you need a significant amount of battery storage to make that feasible at 100%. 450 00:39:19,000 --> 00:39:24,000 Giving customers the ability to be part of a response in the long term. 451 00:39:24,000 --> 00:39:26,000 And this is a long term play. 452 00:39:26,000 --> 00:39:30,000 It's going to be when does demand response become meaningful? 453 00:39:30,000 --> 00:39:33,000 Probably when we have vehicle to grid capabilities. 454 00:39:33,000 --> 00:39:37,000 Probably whenever we have penetration of storage at a much higher level. 455 00:39:37,000 --> 00:39:38,000 It's good answer. 456 00:39:38,000 --> 00:39:41,000 So we're basically doing this to save customers money in the long run. 457 00:39:41,000 --> 00:39:44,000 That's a good reason and it has grid benefits on the side. 458 00:39:44,000 --> 00:39:46,000 And add grid reliability. 459 00:39:46,000 --> 00:39:51,000 So this is a little more difficult question. 460 00:39:51,000 --> 00:39:58,000 I think if I understand the response to the RFPs were pretty much non-responsive. 461 00:39:58,000 --> 00:40:00,000 They weren't what you were looking for. 462 00:40:00,000 --> 00:40:02,000 So what happened? 463 00:40:02,000 --> 00:40:05,000 Are we asking for stuff that hasn't been done in DR before? 464 00:40:05,000 --> 00:40:07,000 Or do the response? 465 00:40:07,000 --> 00:40:08,000 It's missed the boat on this. 466 00:40:08,000 --> 00:40:11,000 Because I understand you're going to refine it and you're going to put it out again. 467 00:40:11,000 --> 00:40:14,000 Because you want to move forward with some programs, some DR programs. 468 00:40:14,000 --> 00:40:16,000 So the scope would happen. 469 00:40:16,000 --> 00:40:19,000 Did they all just try and sell their batteries to us? 470 00:40:19,000 --> 00:40:20,000 Is that what they were doing? 471 00:40:20,000 --> 00:40:24,000 Yeah, I mean, my take on it is you look at the different proposals that were done. 472 00:40:24,000 --> 00:40:28,000 And they were pretty broad in terms of what they provided. 473 00:40:28,000 --> 00:40:39,000 So I think I think us going back and using things like that battery rebate program to refine the scope in a way that we're getting apples to apples comparison. 474 00:40:39,000 --> 00:40:45,000 Getting it quite price competitive and in the scope that addresses directly our needs. 475 00:40:45,000 --> 00:40:46,000 I think is important. 476 00:40:46,000 --> 00:40:54,000 So I think it's one where quite frankly, I think we need a little more time to refine that scope to be exactly what we need it. 477 00:40:54,000 --> 00:40:56,000 And then we can send it back out. 478 00:40:56,000 --> 00:41:04,000 And I don't think it's ahead of, I think it's right where things are going and it's part of that. 479 00:41:04,000 --> 00:41:06,000 But I don't think we're ahead of it. 480 00:41:06,000 --> 00:41:13,000 I think when we refine the scope, we'll be getting proposals that meet our customer needs. 481 00:41:13,000 --> 00:41:14,000 Thank you. 482 00:41:14,000 --> 00:41:15,000 Good luck. 483 00:41:15,000 --> 00:41:16,000 Thank you. 484 00:41:16,000 --> 00:41:18,000 And I just have a follow-up comment. 485 00:41:18,000 --> 00:41:20,000 So one of your questions, Jeff. 486 00:41:20,000 --> 00:41:27,000 I know I shared with Rob several months ago an article in the press about Green Mountain energy. 487 00:41:27,000 --> 00:41:29,000 I think it is in Vermont. 488 00:41:29,000 --> 00:41:35,000 Which is, I believe there are a power company utility. 489 00:41:35,000 --> 00:41:41,000 But they were providing batteries to all of their customers. 490 00:41:41,000 --> 00:41:46,000 And their study showed that it was going to save their customers money. 491 00:41:46,000 --> 00:41:52,000 So you know, they're in a very different market in geography and regulatory environment than we are. 492 00:41:52,000 --> 00:41:58,000 But I think the idea with this is that it's going to benefit everybody. 493 00:41:59,000 --> 00:42:05,000 Any questions in the other locations too? 494 00:42:05,000 --> 00:42:08,000 Okay, please speak up. 495 00:42:08,000 --> 00:42:09,000 Yeah. 496 00:42:09,000 --> 00:42:10,000 So I have a question. 497 00:42:10,000 --> 00:42:12,000 This is Katie Davis. 498 00:42:12,000 --> 00:42:18,000 And I think the program to encourage batteries is great. 499 00:42:18,000 --> 00:42:20,000 We need a lot more of them on the grid. 500 00:42:20,000 --> 00:42:22,000 So I like the instead of idea. 501 00:42:22,000 --> 00:42:25,000 I have a word of warning with all of these. 502 00:42:26,000 --> 00:42:31,000 As all these diverse science programs come online and there are overlaps. 503 00:42:31,000 --> 00:42:34,000 And in particular with these integrations. 504 00:42:34,000 --> 00:42:35,000 Because I have this experience. 505 00:42:35,000 --> 00:42:40,000 I have solar battery trying to join a slow virtual power plant. 506 00:42:40,000 --> 00:42:44,000 And to that I know you see a suddenly helping medicine. 507 00:42:44,000 --> 00:42:49,000 The IOU said you're already using a demand response system. 508 00:42:49,000 --> 00:42:54,000 You know, which tells you to power off things when you need to. 509 00:42:54,000 --> 00:42:55,000 So we onion roll from that. 510 00:42:55,000 --> 00:42:57,000 And then we try to get that in roll. 511 00:42:57,000 --> 00:43:00,000 And you're like, no, now you're going to be something called leap. 512 00:43:00,000 --> 00:43:03,000 And we have no idea what that is. 513 00:43:03,000 --> 00:43:10,000 And there's no fight number or email for them because they're because they're at so party. 514 00:43:10,000 --> 00:43:11,000 Kind of like you. 515 00:43:11,000 --> 00:43:17,000 And so we have to ask experts and finally figured out that my husband signed up for this. 516 00:43:17,000 --> 00:43:22,000 That tells you when to charge your car. 517 00:43:22,000 --> 00:43:26,000 So always it's like a lot of weeks to time and effort. 518 00:43:26,000 --> 00:43:28,000 Very confusing for consumers. 519 00:43:28,000 --> 00:43:30,000 And then she also figured out this. 520 00:43:30,000 --> 00:43:32,000 You think about rolling out a program like this. 521 00:43:32,000 --> 00:43:37,000 The thing about this kind of overlaps and and and problems that are. 522 00:43:37,000 --> 00:43:39,000 Up there right now. 523 00:43:39,000 --> 00:43:41,000 If it is the way he's work. 524 00:43:41,000 --> 00:43:44,000 So to that in mind. 525 00:43:45,000 --> 00:43:52,000 Great comment that is something that we're looking into really appreciate it. 526 00:43:52,000 --> 00:43:56,000 We have any other council members. 527 00:43:56,000 --> 00:44:03,000 Feel free to speak up in the remote sites because it's hard to see everybody on the screen here. 528 00:44:03,000 --> 00:44:10,000 I had a couple of questions myself if everyone else is spoken their piece. 529 00:44:10,000 --> 00:44:17,000 In in your staff report it talked about putting a focus on commercial demand response. 530 00:44:17,000 --> 00:44:21,000 And I wonder if you could just give us a little bit more specificity about that. 531 00:44:21,000 --> 00:44:30,000 It's not something that we've talked about a whole lot during the the last year here. 532 00:44:30,000 --> 00:44:33,000 I'll take a stab in and then turn it to Chris. 533 00:44:33,000 --> 00:44:43,000 So when we started the the discussion one of the first places we started was an assessment of customers looking at their load and their ability to respond. 534 00:44:43,000 --> 00:44:49,000 So commercial customers statistically while a smaller number of customers much more significant load. 535 00:44:49,000 --> 00:44:57,000 So you know the three areas that that Chris identified that we didn't move forward at this point was cost effectiveness. 536 00:44:57,000 --> 00:45:01,000 The ability to verify whether or not. 537 00:45:00,000 --> 00:45:12,000 We're not people who are already in a demand response program exactly what Councilwoman Davis, which is identified, and then that battery issue. 538 00:45:12,000 --> 00:45:27,000 So, in the commercial space, you're addressing two of three of those, which is you're moving it outside of the small battery, you can do larger batteries, and you get a much better bang for your buck in terms of actual demand response. 539 00:45:27,000 --> 00:45:37,000 So, it's really about, if there's anywhere that there's a solution where demand response can be cost effective, we want to investigate that area. 540 00:45:37,000 --> 00:45:48,000 And it's likely a focus for the staff over the summer next part of next year to further refine some proposals to think about whether or not it makes sense to move forward there. 541 00:45:48,000 --> 00:46:02,000 And I were calling correctly when early on when we were talking about demand response that didn't we do a demand response commercial program a couple of years ago, and we found that it wasn't very effective. 542 00:46:02,000 --> 00:46:07,000 So, is that that's just a learning experience that we try to figure out how to make it work better. 543 00:46:07,000 --> 00:46:20,000 That's a, we did a behavioral demand response program where we utilize the flex alert to tell customers, you know, when there is a flex alert reduce your, your consumption. 544 00:46:20,000 --> 00:46:28,000 So, it wasn't given customer the two things that they need to do to be able to respond education and actual tools to do so. 545 00:46:28,000 --> 00:46:39,000 And we were counting on customers to be able to respond and what we determined in follow up conversations with those customers is while the dollar amount was really significant. 546 00:46:39,000 --> 00:46:44,000 And I believe it was a dollar 50 a kilowatt, so 150 dollars of megawatt. 547 00:46:44,000 --> 00:46:48,000 Oh, I'm sorry, $1,500 a megawatt. 548 00:46:48,000 --> 00:46:54,000 That's a significant cost, but most commercial entities said that's not enough for me to change my operation. 549 00:46:54,000 --> 00:47:05,000 I am in the business of building widgets and not in the business of producing nano watts, but still those customers who did not change their operation. 550 00:47:05,000 --> 00:47:20,000 If their performance was improved over a baseline of I think two weeks prior, which was much more dependent on whether than any proactive steps that the customer would have taken, they would have profited from the program. 551 00:47:20,000 --> 00:47:31,000 So it was an intended program and if you recall a few years ago when we did that, we did not expect that it was going to lead to any actual demand response and change in behavior. 552 00:47:31,000 --> 00:47:44,000 But we wanted to do it for the education and be able to point that out to the commission because at the time the commission was looking to require a behavioral demand response program of all LSEs. 553 00:47:44,000 --> 00:47:52,000 So apples and oranges between what that was and what we think is necessary to get actual response. 554 00:47:53,000 --> 00:47:57,000 Do we have any further comments from the council? 555 00:47:57,000 --> 00:48:01,000 Chris, thank you very much for that report. 556 00:48:01,000 --> 00:48:02,000 Appreciate it. 557 00:48:02,000 --> 00:48:14,000 And I just want to thank Eric for attending, taking the time with us, walking through the platform really appreciate your time and your willingness to share your expertise with us. 558 00:48:15,000 --> 00:48:16,000 Thank you all. 559 00:48:16,000 --> 00:48:20,000 We have any public comment on this item. 560 00:48:20,000 --> 00:48:22,000 No public comment, sure. 561 00:48:22,000 --> 00:48:26,000 Thank you. 562 00:48:26,000 --> 00:48:32,000 So we're going to go to the CEO report next, I believe. 563 00:48:32,000 --> 00:48:33,000 Thank you, Chair. 564 00:48:33,000 --> 00:48:40,000 So in the CEO report, I'm going to take it a little bit out of order because I'm going to have chief operating officer, Mr. Dichoniel, 565 00:48:40,000 --> 00:48:45,000 walk through the 100% renewable energy update. 566 00:48:45,000 --> 00:48:51,000 And what you see on the first page is really a lot of work around staffing. 567 00:48:51,000 --> 00:49:00,000 So I appreciate both the human resource effort and then the management effort to go through and identify candidates to bring them on board. 568 00:49:00,000 --> 00:49:07,000 The investments that you're seeing here in terms of staff around energy programs, data analysts, 569 00:49:07,000 --> 00:49:16,000 our communications and engagement with underserved communities, our deputy county council who, or I'm sorry. 570 00:49:16,000 --> 00:49:24,000 Maybe maybe a Freudian slip, our deputy general council who came from the county council's office in Monterey, 571 00:49:24,000 --> 00:49:28,000 as well as Operation Management and the Power Services area. 572 00:49:28,000 --> 00:49:35,000 These are all really significant investments to our operations, both on the power services side and the program space. 573 00:49:35,000 --> 00:49:45,000 Really happy to see these hires. There's a lot of other sort of movement and promotions within the agency and some other significant hires that are days away. 574 00:49:45,000 --> 00:49:59,000 So really looking forward, I think we've we've tipped over to 40 employees for the first time meeting that we're cutting in to what was sort of a systemic. 575 00:50:00,000 --> 00:50:14,000 So we still have other positions and I think additional growth in the agency will be necessary, especially as more and more energy assets come online as the number of PPAs were operating increases. 576 00:50:14,000 --> 00:50:29,000 The need to optimize those operations in the market, the settlement and back end of making sure that we're settling out all of the payment obligations are really significant sophisticated operations. 577 00:50:29,000 --> 00:50:37,000 So I see even beyond the positions we have currently that we may grow in that space in particular. 578 00:50:37,000 --> 00:50:44,000 The other item that I just wanted to note if you were at the Operations Board or we're listening into the Operations Board. 579 00:50:44,000 --> 00:50:53,000 The Operations Board have established an ad hoc committee to look at sort of the structure of communications. 580 00:50:53,000 --> 00:51:03,000 At 19 members on the policy board and 19 members on the Operations Board that's 38 I can no longer say I have more bosses than employees. 581 00:51:03,000 --> 00:51:22,000 But it's a significant number and I think the issues have been around sort of how do we communicate the non seeded member agencies, how does that allocation of seats work what are the responsibilities for those individuals that are in those permanent seats to help us communicate the other members. 582 00:51:22,000 --> 00:51:38,000 How are we using city selection committees and other formal processes to do that so they're working on that and that's their task over the summer and then as they conclude any recommendations to come out of that will be taking to the policy board. 583 00:51:38,000 --> 00:51:48,000 And with that, if I'll pause and take any questions on the two pieces I shared before turning it over to Dennis and we can bring up his PowerPoint. 584 00:51:48,000 --> 00:51:53,000 Are there any questions for me? 585 00:51:53,000 --> 00:51:55,000 Great. 586 00:51:55,000 --> 00:51:57,000 John, do you want to bring up the PowerPoint? 587 00:51:57,000 --> 00:52:01,000 Excuse me, we do have a question from council member Byron. 588 00:52:01,000 --> 00:52:03,000 So I have a feeling. 589 00:52:03,000 --> 00:52:09,000 Steiko Niel is going to talk about interconnection and piece pph challenges, right? 590 00:52:09,000 --> 00:52:10,000 That's right. 591 00:52:10,000 --> 00:52:14,000 So this governance challenge that you've identified. 592 00:52:14,000 --> 00:52:17,000 I'm not quite sure I understand the way you were to that but. 593 00:52:17,000 --> 00:52:23,000 How how's how significant do you think that is? 594 00:52:23,000 --> 00:52:25,000 I mean, this is this is a big challenge. 595 00:52:25,000 --> 00:52:30,000 The geographical area is so large that like you say so many different jurisdictions. 596 00:52:30,000 --> 00:52:35,000 Is it is it causing some difficulty for for governing this organization? 597 00:52:35,000 --> 00:52:42,000 It is probably an administrative challenge and you all are experiencing it as well. 598 00:52:42,000 --> 00:52:46,000 You know, needing to have a certain number of set remote locations. 599 00:52:46,000 --> 00:52:48,000 How you notice those having them be staffed. 600 00:52:48,000 --> 00:52:50,000 Uniform every time. 601 00:52:50,000 --> 00:52:52,000 So the customers have a sense of where they're going. 602 00:52:52,000 --> 00:52:54,000 These are the types of challenge. 603 00:52:54,000 --> 00:52:57,000 They're easy relatively easy to overcome. 604 00:52:57,000 --> 00:53:00,000 But they require some purposeful thought around them. 605 00:53:00,000 --> 00:53:03,000 But you know, we have a very engaged board. 606 00:53:03,000 --> 00:53:07,000 We have an operations board that is looking at some of the challenges. 607 00:53:07,000 --> 00:53:10,000 I wouldn't say that they're significant in any way. 608 00:53:10,000 --> 00:53:17,000 I just think that at 35 member agencies and two boards of nineteen. 609 00:53:17,000 --> 00:53:25,000 There are some needs to put in some better communications and procedures so that we're all operating in the same space. 610 00:53:25,000 --> 00:53:27,000 So, you know, one area. 611 00:53:27,000 --> 00:53:29,000 I mentioned the city selection committee. 612 00:53:29,000 --> 00:53:38,000 Currently members can have an MOU amongst themselves or some other agreement or utilize the city selection committee. 613 00:53:38,000 --> 00:53:47,000 Well, that means the relationship and how people are sharing information among joint seats changes from one area to the other. 614 00:53:47,000 --> 00:53:54,000 And it's more about unifying a lot of that communication so that everybody feels they're a part of the agency. 615 00:53:54,000 --> 00:53:59,000 I'm really glad to see that this is operations board is taking this up. 616 00:53:59,000 --> 00:54:05,000 I mean, that's a heads-up approach to a maybe a problem that may grow bigger at some point. 617 00:54:05,000 --> 00:54:06,000 Thank you. 618 00:54:06,000 --> 00:54:11,000 Yeah, I'd like to just like to follow up and say, I'm really glad to see that that's happening also. 619 00:54:11,000 --> 00:54:17,000 I've attended most of the policy and operations board meetings since our inception. 620 00:54:17,000 --> 00:54:22,000 And, you know, with that many people sitting especially on the policy board. 621 00:54:22,000 --> 00:54:30,000 If there's anything that there's any difference of opinion on and everybody wants to say their peace, it just takes a huge amount of time. 622 00:54:31,000 --> 00:54:43,000 And the turnover in the composition of those boards is challenging because all of us here know that it's a complicated business and it's hard when it's new faces all the time. 623 00:54:43,000 --> 00:54:56,000 So I know there's been an effort to keep city members in the loop when they're not sitting on the board in between times, but it is a big challenge and look forward to some creative solutions. 624 00:54:56,000 --> 00:55:01,000 Thank you, Chair. John, can you bring up the presentation? 625 00:55:04,000 --> 00:55:18,000 Good afternoon, Chair Capron and other council members, Dennis Teachoneel. She's operating officer here to provide an update on our progress on our getting to 100% clean and renewable power. 626 00:55:19,000 --> 00:55:26,000 I want to start with going back to when we adopted this policy in September of 2020. 627 00:55:26,000 --> 00:55:34,000 The policy board decided that there's a more impactful path we could pursue. 628 00:55:34,000 --> 00:55:47,000 And the discussions at the time pertain to one, you know, what we were doing at the time was purchasing renewable power from existing power plants and buying what we say. 629 00:55:47,000 --> 00:56:05,000 And the parlance is carbon free attribute purchasing and it was identified that there's a more impactful way to go about it securing and focusing on long term contracting does produce new projects being built with the ultimate goal of displacing the existing conventional fleet. 630 00:56:05,000 --> 00:56:16,000 So that was one aspect for why we adopted this 100% policy. The second was there was a lot of focus on regulatory accounting mechanism called the power content level. 631 00:56:16,000 --> 00:56:25,000 Our content level most folks are familiar with that, but there there are some weaknesses to it, which I want to illustrate here. 632 00:56:25,000 --> 00:56:30,000 And it was part of the decision to adopt the new policy. 633 00:56:30,000 --> 00:56:45,000 And what I know there's a lot of information here and I'll talk as you as you look at it, but if you look at the far right, that is those percentages represent the mix for PG&E of their power supply based on the retail sales. 634 00:56:45,000 --> 00:56:49,000 And that's what shows up on the power content level. 635 00:56:49,000 --> 00:56:55,000 But what I've presenting to you here is what are the volumes that drove those percentages. 636 00:56:55,000 --> 00:57:08,000 And on the left hand side is really what everything PG&E procured and this is public information you can request from the PUC about those volumes. 637 00:57:08,000 --> 00:57:24,000 And what is what and I'm doing this to highlight that this regulatory accounting is somewhat flawed and what what it's showing is that 25.5% of PG&E's procurement supply was from natural gas. 638 00:57:24,000 --> 00:57:29,000 But the CEC who administers the power content level has this. 639 00:57:29,000 --> 00:57:34,000 This arcane hard to understand rule called over procurement adjustment mechanism. 640 00:57:34,000 --> 00:57:40,000 Maybe council member Byron can help us understand that, but. 641 00:57:40,000 --> 00:57:50,000 Yeah, but it's what it does is what if a load serve an entity over procures, they have a way of cutting the volumes in the falling order. 642 00:57:50,000 --> 00:57:57,000 They first cut natural gas and then they will cut these other fuels. 643 00:57:57,000 --> 00:58:02,000 You know, they go natural gas, coal, nuclear, large hydro then renewable. 644 00:58:02,000 --> 00:58:08,000 So what this does is it adjust the volumes that get used for the power content level. 645 00:58:08,000 --> 00:58:15,000 So on the on the right hand side shows the volumes that were used to drive the percentage mix that goes shows up on the power content level. 646 00:58:15,000 --> 00:58:27,000 So what you see here is this accounting in accuracy is that PG&E's procurement was 25.5% natural gas, but what shows up on the power content level is 4.8. 647 00:58:27,000 --> 00:58:34,000 So it's allowing PG&E because they've over procured and a lot of that has to do with their departing load. 648 00:58:34,000 --> 00:58:40,000 That they appear more carbon-free than they really are. 649 00:58:40,000 --> 00:58:50,000 And so that was part of the discussion back in 2020 and it was the policy board decided we want to do something more impactful and long term contracting. 650 00:58:50,000 --> 00:59:05,000 And getting to 100% is going to dry as move the needle more than then just focusing on our power content label showing a higher percentage. 651 00:59:05,000 --> 00:59:11,000 So I want to turn now to what have we been doing since we've adopted this policy. 652 00:59:11,000 --> 00:59:31,000 And I want to show you that since that time we've entered into 15 renewable contracts, about nine of them are sorry, eight of them are solar plus storage projects, two wind projects, four geothermal projects and one solar only project. 653 00:59:31,000 --> 00:59:41,000 Now this is producing over this will produce when all these projects are aligned over a thousand megawatts of new renewable power for the grid. 654 00:59:41,000 --> 00:59:52,000 And in addition to the batteries that are necessary ingredient to be able to dispatch the solar in more opportune times. 655 00:59:52,000 --> 00:59:56,000 I've left out of this chart kind of our standalone energy storage agreements. 656 00:59:56,000 --> 01:00:00,000 There's seven of those those are necessary ingredient, but we're talking about here about our. 657 01:00:00,000 --> 01:00:11,000 Our RPS goals. I want to turn to of those 15 projects. Seven of them have begun delivering for our customers. 658 01:00:11,000 --> 01:00:22,000 And really, this is a big accomplishment. I want to highlight a couple things. Victory pass, the bottom one, just came online in March and added, is serving 5% of our customers load. 659 01:00:22,000 --> 01:00:29,000 The geothermal, man with Casa Diablo, first geothermal power plant to be built within California in the last 30 years. 660 01:00:29,000 --> 01:00:41,000 We were responsible for that. And so, right now, we are serving about 33% of our load. I know I have 29% in the chart. 661 01:00:41,000 --> 01:00:50,000 What I mentioned is that starting at 2025, we are expanding to add the city of Atasca Dero and San Luis Fiscal County. 662 01:00:50,000 --> 01:01:02,000 And that's moving the needle a little bit on our load. So, it shifts it to a 29% of our load would be served once those communities are being served by us. 663 01:01:02,000 --> 01:01:12,000 But I actually want to turn now to what I would call, introduce some dunkel flauta into the conversation. 664 01:01:12,000 --> 01:01:22,000 For folks who were in attendance at our fall 2022 conference, I introduced that term. It's a German word meaning dark doldrums. 665 01:01:22,000 --> 01:01:29,000 And it's used in the German energy renewable energy industry to represent when solar and wind is not producing. 666 01:01:29,000 --> 01:01:40,000 But I want to expand that discussion. The doldrums we're in now is with the development cycle projects getting online, according to the plan. 667 01:01:40,000 --> 01:01:47,000 And of these seven projects, five of them were delayed three to eight months. 668 01:01:47,000 --> 01:01:56,000 So, that's just one example that we are in this dunkel flauta as it relates to renewable project development. 669 01:01:57,000 --> 01:02:08,000 Moving on to what are the driving issues for why development of these projects is taking longer than anyone has anticipated. 670 01:02:08,000 --> 01:02:13,000 The one that started with COVID is the supply chain issues. 671 01:02:13,000 --> 01:02:25,000 And these developers were really through a wrench in their plans back when when the supply chain of solar panels that are coming primarily from China were interrupted. 672 01:02:25,000 --> 01:02:30,000 And it introduced delays into their projects being able to come online. 673 01:02:30,000 --> 01:02:43,000 Now, the solar piece has somewhat ease, but there's there's other the associated equipment step up transformers as a new issue that's introducing problems for developers. 674 01:02:43,000 --> 01:02:59,000 What used to take a year is now taking three to four years to get those parts, which means these developers have to be very proactive at placing the orders for these necessary interconnection equipment for these solar. 675 01:02:59,000 --> 01:03:03,000 And other renewable farms. 676 01:03:03,000 --> 01:03:12,000 So the supply chain is something that one it impacted our online projects that were delayed, but it's also where we have about our under development. 677 01:03:12,000 --> 01:03:20,000 We have eight projects under development. They're all doing the best they can to try to come online to what to the date say committed to. 678 01:03:21,000 --> 01:03:30,000 Excuse me. But but but but they're still that that concern with the supply chain for some of the equipment they need to come online. 679 01:03:30,000 --> 01:03:38,000 But really the more the more prominent problem, this dunkelflower issue in my mind is the interconnection process. 680 01:03:38,000 --> 01:03:59,000 This process has become very dysfunctional in my opinion. It's it's a very challenging up effort for a developer who has to submit an interconnection application with with with the entities responsible for for these power plants to come online. 681 01:03:59,000 --> 01:04:08,000 And what used to take pretty routinely two to three years to submit an interconnection request and beyond line is now taking five to eight years. 682 01:04:08,000 --> 01:04:14,000 And so this this is this is the one that keeps me up at night worrying because I see this problem. 683 01:04:14,000 --> 01:04:20,000 I think all the regulators see the problem even the federal government is putting out. 684 01:04:20,000 --> 01:04:34,000 Memos to say you got to fix this because it's not just occurring within California it's all across the North America with with slow interconnection times. 685 01:04:34,000 --> 01:04:42,000 And so this is this is these are these are issues that persist for our under development under development projects. 686 01:04:42,000 --> 01:04:52,000 But turning to kind of our getting to the bottom line how are we how's our what's our progress looking like for getting to our goal. 687 01:04:52,000 --> 01:05:03,000 And I mean I got two charts here about really the let's focus on the one on the left because that shows our position with regard to getting that 100% goal. 688 01:05:03,000 --> 01:05:11,000 Before we move the goal post and adds a task of their own slow right let's talk about the the chart on the left for the moment. 689 01:05:11,000 --> 01:05:26,000 If you look at the green line that's really showing our under contract projects and what percentage of our anticipated load it would serve and by 2030 we would have been at 74% with our existing projects. 690 01:05:27,000 --> 01:05:36,000 I mean moving over to the shift to goal post of a taskator and slow at 64% for those same batch of projects. 691 01:05:36,000 --> 01:05:44,000 And we plan the dotted line is showing that we plan to go out and contract for more to get to that 100% goal we still have time to do that. 692 01:05:44,000 --> 01:05:55,000 I want to show that that red line because what is that showing we these are experienced delays for our online projects and even projects under development that have had asked for more time. 693 01:05:55,000 --> 01:06:07,000 And you can see a huge drop right I mean in 2023 2024 we're talking in the 30% reduction in how much renewable energy we expected but didn't get. 694 01:06:07,000 --> 01:06:27,000 And so this is really interfered with our abilities to get gets closer to that goal quicker and it also is also affected our compliance obligation sometimes we have to we have to take action to make sure we're going to be compliant with some of the regulatory obligations we have. 695 01:06:27,000 --> 01:06:40,000 So so this is you know I want to kind of move out of the dark doldrums here a little bit and just tell you that we are cautiously optimistic that we can still get to our goal. 696 01:06:40,000 --> 01:06:59,000 We've we've just issued an RFO got we got over 100 offers on May 22nd and we're currently sifting through them analyzing them and we're hopeful that we can find projects that one can help us get to our goal and come online in time to do so. 697 01:06:59,000 --> 01:07:13,000 And and we'll continue to to strive towards that goal and and hope that that the for in my mind the interconnection process needs reform to be streamlined and get back to that two to three years cycle. 698 01:07:13,000 --> 01:07:20,000 So that we can get there and that concludes my presentation happy to take any questions may have. 699 01:07:21,000 --> 01:07:31,000 If I can just add to quick points maybe three two points in a story I promise to be brief one is the plan moving forward. 700 01:07:32,000 --> 01:07:53,000 8 to 12 percent of load a year as we move forward we'll still get us to that 2030 so as Dennis mentioned cautiously optimistic and as we're evaluating projects that interconnection queue position it really means they need to restart a few years ago so developers if you're listening and you're thinking that you're walking in today. 701 01:07:53,000 --> 01:08:04,000 You know your project may be there but we may be thinking further along than this the other piece is you know I think it's important to keep in mind. 702 01:08:04,000 --> 01:08:09,000 What energy procurement means for customers and costs so. 703 01:08:10,000 --> 01:08:17,000 You know Mr. Osmers not here but I always want to make the point that he makes so well which is. 704 01:08:17,000 --> 01:08:36,000 Our climate goals are tied to the cost of energy and if we cannot electrify right the goal is you decarbonize the grid you use that decarbonize electricity to go after the low hanging fruit of electrify everything and then you focus on the industrial pieces that are difficult to electrify. 705 01:08:37,000 --> 01:08:58,000 And without the low cost our climate goals are going to be further away so as we move forward at a very high cost in the energy market highest market that we've seen in some 20 to 25 years it's important that we keep in mind what our ultimate goals are which is to. 706 01:08:58,000 --> 01:09:12,000 Move away from fossil fuels entirely you know so I just I add that caution that it's not just a number that we have for 2030 and our goal of 100% we do want to get there. 707 01:09:12,000 --> 01:09:19,000 But as we move forward we're very mindful of where the market is where the value in the market is and you know whether. 708 01:09:19,000 --> 01:09:29,000 It makes sense today to go after 8% or maybe is 4% and then we plan for a larger portion in future years when we see where the market is going. 709 01:09:29,000 --> 01:09:36,000 It's just important to keep that in mind as part of our planning not just you know the dotted line on the chart. 710 01:09:36,000 --> 01:09:42,000 The other point that I wanted to raise is is a bit of a story and I apologize for this which is. 711 01:09:42,000 --> 01:09:57,000 I had an opportunity recently to meet with an interconnection consultant and he's been in the industry since the early 2000s and this is his job is to look for capacity and citing and to help developers site projects so that they can get done. 712 01:09:57,000 --> 01:10:15,000 What he shared with me was I started this in this industry and I didn't know anything it was the best job in the world because they would come to me and they say where can I site a project it was 2006 in renewable energy was important the answer was anywhere you darn well please. 713 01:10:15,000 --> 01:10:25,000 Because there's capacity out there this political appetite that build these projects you know the commission of set procurement targets and the answer was easy anywhere you want. 714 01:10:25,000 --> 01:10:33,000 He says now I'm at the tail end of my career and you know I look at it and I think this is the easiest job in the world. 715 01:10:33,000 --> 01:10:43,000 Because 20 years ago the answer was cited anywhere you want and the answer today is you can't site it anywhere there is no capacity so he says might the book ends in my career is. 716 01:10:43,000 --> 01:10:52,000 I basically sit in my computer and collect my check that I don't have to do anything because the answer is the same as it was to our 20 years ago just for different reasons. 717 01:10:52,000 --> 01:10:58,000 Anyway just a little bit of color to the point that Dennis is making. 718 01:10:58,000 --> 01:11:00,000 Councilmember Sedan. 719 01:11:00,000 --> 01:11:10,000 As Dennis thanks for the presentation I guess I'm sort of warning where the guard rails are contractually because only seven out of the 15 projects were delivered. 720 01:11:10,000 --> 01:11:20,000 What was the expectation with regard to the other eight when were they going to come online and then of course I hear about the introduction introduction issues and that. 721 01:11:20,000 --> 01:11:38,000 Siting and all that that's a big problem and I know there's a lot of we just had a meeting with carb and CEC and CPU you see they're talking about you know permit streamlining and all that stuff but I guess if you're writing if you have a contract they should have a delivery date. 722 01:11:39,000 --> 01:11:56,000 And they shouldn't be able to say well we don't we can't meet the process is I guess what's the given take their relative to fulfilling the contracts and over those eight that are not online when are they anticipated to be online. 723 01:11:56,000 --> 01:12:03,000 Well just in terms of the contracts in general we tend to build in a some cushion with allowed. 724 01:12:03,000 --> 01:12:25,000 Extensions to the time anywhere from three to six months in it it has to have to be very specific reasons to to allow that you know force measure is one example of something beyond the developers control but we have other things related to interconnection being one of them which we talk about that's often something they don't have control over. 725 01:12:26,000 --> 01:12:38,000 Usually though if they run up against those allowed extensions in the contract then it brings about a much more serious discussion on whether or not we're going to take action and maybe. 726 01:12:38,000 --> 01:12:54,000 We have to usually have to men the contract which we've done with several of our projects the ones that are still under development they have they have very they have different stages a lot of them are going to be in the 25 to 27 timeframe. 727 01:12:54,000 --> 01:13:05,000 Currently and and so those will be that's when they're they're currently planned to come online. 728 01:13:06,000 --> 01:13:08,000 Councilmember Bowman. 729 01:13:08,000 --> 01:13:18,000 Thank you Dennis what impact will the new tariffs on solar from the Biden administration have is if you can highlight that. 730 01:13:18,000 --> 01:13:27,000 Yeah actually I had a note to comment on that but I didn't want to go too dark don't go flout but yeah that one is sort of looming right is that. 731 01:13:27,000 --> 01:13:44,000 That the re-imposition of the solar terraces is also going to return the developers challenges on on getting those product those solar panels shipped over and whatever timeline they had expected because what it did last time was. 732 01:13:44,000 --> 01:13:50,000 The shipers just left them in the ports they didn't want to send them over to the US until it got resolved. 733 01:13:50,000 --> 01:14:00,000 And so they just sat there on ships and and that's likely to happen again with the I don't I don't think it's fully imposed yet right it's just being talked about. 734 01:14:00,000 --> 01:14:15,000 And then if I may and in terms of you know projection of total energy consumption due to AI and crypto currency and so forth once you find yourself regardless of how many projects you have online. 735 01:14:15,000 --> 01:14:24,000 It'll still be a smaller and smaller percent of the total load not not that you can do anything about it but it's just something to think about in terms of the long term goals. 736 01:14:24,000 --> 01:14:37,000 I think right you're just commenting on what is our expected low growth and we do try to we do try to follow what the state the state does look at what is the year over your low growth due to AI EV. 737 01:14:37,000 --> 01:14:52,000 EV adoption rates right and I think there's been recently there's been criticism of the CEC of not doing a good job on that we tend to defer to them but we also look at other sources and and try to adopt. 738 01:14:52,000 --> 01:14:59,000 I think the low growth that we believe to be the most reasonable in terms of for planning purposes. 739 01:14:59,000 --> 01:15:00,000 I just want to. 740 01:15:00,000 --> 01:15:06,000 To both questions first about tariffs, there is a little bit of window before those are in effect. 741 01:15:06,000 --> 01:15:12,000 And I would strongly encourage that developers that want to do business need to be securing their supply chain now. 742 01:15:12,000 --> 01:15:28,000 And I think we've seen a lot of developers going to do that. And this is a carrot and stick operation from the Biden administration, encouraging US soil manufacturing of PV and battery components. 743 01:15:28,000 --> 01:15:38,000 And also saying we're going to have tariffs for imported. So we are seeing more manufacturing moved to the United States and developers should be moving to secure that. 744 01:15:38,000 --> 01:15:48,000 The other piece that may we may see change is the design of the battery modules because of the way the tariffs are currently proposed. 745 01:15:48,000 --> 01:15:55,000 Moving the high cost components outside of the battery containment unit. 746 01:15:55,000 --> 01:16:05,000 As with respect to the AI, Dennis exactly right, we are constantly looking and forecasting our potential load growth. 747 01:16:05,000 --> 01:16:15,000 AI is an interesting northern Virginia is the primary location. The other locations that you're seeing AI data centers being cited. 748 01:16:15,000 --> 01:16:19,000 The Pacific Northwest where there's significant water. 749 01:16:19,000 --> 01:16:29,000 And then also in areas where there is very cheap land, there is own a desert, which also has a nuclear power facility nearby. 750 01:16:29,000 --> 01:16:40,000 They have gone to the point that the demand is so significant, the load that they would be adding to the grid that they're really looking at stable supply of energy. 751 01:16:40,000 --> 01:16:54,000 So renewables scare them a little bit. They are looking at how can I co-locate next to constant base load resources and then cost of the land is really significant. 752 01:16:55,000 --> 01:17:14,000 If I could add to that there's current legislation proposed right now that would allow server farms and data mining operations as well as AI to actually use diesel fired generators and be able to skip air district permitting requirements. 753 01:17:14,000 --> 01:17:34,000 Of course my association is opposed to that because of the environmental and health cost, but that's the thinking right now is the state on one hand is saying we need all renewables and the other hand is saying let's build as many diesel fired generators as we can to support these projects. 754 01:17:34,000 --> 01:17:43,000 There's not really a unification or any direction north arrow that's being followed that I can see right now. 755 01:17:43,000 --> 01:17:58,000 So we'll have to wait and see how that pencils out, but these generator farms have the ability to actually have an area go into a non-attainment with federal and state air quality standards there that massive. 756 01:17:58,000 --> 01:18:21,000 So we're very concerned about what may be happening and then there's also the diesel emergency response during heat crisis and so forth that's something that's been shelved right now at car but it's going to find this way back very shortly so I'll let you know when that happens you're definitely going to want to participate in that. 757 01:18:29,000 --> 01:18:30,000 Council Member Byron. 758 01:18:30,000 --> 01:18:32,000 Thank you Mr. Chair. 759 01:18:32,000 --> 01:18:43,000 I think this is a really significant issue and I thank you for highlighting this obviously there's a lot of reasons around these delays and you've and you've touched on all of them. 760 01:18:43,000 --> 01:18:49,000 I would think for the most part everybody in the procurement business is in the same boat. 761 01:18:49,000 --> 01:19:00,000 Right I mean it's not as though we're not going out and asking for something that no one else is it and you want to increase everybody else wants to increase we got some strong goals in the state. 762 01:19:00,000 --> 01:19:09,000 CCA's are driving it well well beyond to my understanding well beyond with the but the PUC's requiring the IOUs to do. 763 01:19:09,000 --> 01:19:18,000 But having worked in this industry for a long time and I haven't been in the procurement process for at least ten years and some of these issues are not new. 764 01:19:18,000 --> 01:19:25,000 Okay the interconnection issues with with the IOUs I know you say the ISO but. 765 01:19:25,000 --> 01:19:32,000 The IOUs own these lines right and and I doubt the POUs are having problems. 766 01:19:32,000 --> 01:19:39,000 Building and procurement what they want to the publicly on utilities are having the municipal's are having any trouble. 767 01:19:39,000 --> 01:19:47,000 So the gating issue still is the IOUs and the incentives that they have are contradictory to what. 768 01:19:47,000 --> 01:19:49,000 We're trying to do here. 769 01:19:49,000 --> 01:20:06,000 For 25 years the IOUs in the state have resisted renewables kicking in screaming from the first legislation that was passed you know the sheer legislation back in about 2000 to set an RPS a renewable portfolio standard. 770 01:20:06,000 --> 01:20:09,000 They're still kicking in screaming except. 771 01:20:09,000 --> 01:20:17,000 You know now they can put this in the rate base well they always could and that's how they make money and and. 772 01:20:17,000 --> 01:20:27,000 So I'm still concerned Mr. Dyson ill that what we've got the gating issue here is the IOUs and I know we're all working together and. 773 01:20:27,000 --> 01:20:34,000 Mr. Shaw's reluctant to say anything negative about are being good team members with our investor on utilities. 774 01:20:34,000 --> 01:20:40,000 But I'd like to ask if you could be pretty candid with this house how concerned do you. 775 01:20:40,000 --> 01:20:41,000 I mean. 776 01:20:41,000 --> 01:20:46,000 I don't know exactly how to ask the question except that's my primary concern. 777 01:20:46,000 --> 01:20:50,000 This is not new we've seen this before. 778 01:20:50,000 --> 01:20:58,000 I appreciate the question. Council member Byron I don't know if I agree that the IOUs are the. 779 01:20:58,000 --> 01:21:07,000 The cause I mean they do contribute to the delays because they don't adequately resource the work crews to do the interconnection work. 780 01:21:07,000 --> 01:21:15,000 It's not just the work is the reviews I mean I know the insameteo county there's one person that does the distribution interconnection work for PG&E. 781 01:21:15,000 --> 01:21:28,000 But but I do think and and even the federal energy regulatory commission has identified that the way that the KISO runs its interconnection queueing program is is has problems where. 782 01:21:28,000 --> 01:21:43,000 People interconnect and get in the queue and they sit there and they never move forward on developing their projects and now because they've closed the door on new interconnection request you see gaming behavior by the developers on trading out these. 783 01:21:43,000 --> 01:21:49,000 These positions and so to me the major reform has to happen with the KISO. 784 01:21:49,000 --> 01:21:58,000 To to give more transparency and clarity and certainty to the development community on how long it's going to take. 785 01:21:58,000 --> 01:22:04,000 And and and what they need to do to get their their projects online and delivering. 786 01:22:05,000 --> 01:22:16,000 The IOUs look I I acknowledge that we've had some some information provided to us by developers that there's there's there they're introducing delays but it's really. 787 01:22:16,000 --> 01:22:21,000 Under resourcing by the IOUs of the necessary interconnection work. 788 01:22:21,000 --> 01:22:33,000 We still have a hybrid market as far as I understand you're not you do not participate in the procurement review groups at the investor on utilities those are all still closed not NDA confidential. 789 01:22:33,000 --> 01:22:43,000 Processes they're out there procurement power and nobody knows because of their monopsomy power they nobody sees that information that they can disclose. 790 01:22:43,000 --> 01:22:51,000 In fact they make everybody that submits a proposal sign an NDA saying they will not discuss whether or not they're on the short list, etc. 791 01:22:51,000 --> 01:22:57,000 But I think it's worth watching how the IOUs are doing in their procurement process. 792 01:22:57,000 --> 01:23:12,000 Right and I don't have any sense of that because I haven't been following that for a while but I am still dubious that that's where it is and of course the conclusion from all of this is we have to face facts we're not going to hit our renewable goals. 793 01:23:12,000 --> 01:23:22,000 The way we've projected them to be I know you want to be optimistic but it looks to me like we're lagging at least five years behind. 794 01:23:22,000 --> 01:23:31,000 Let me jump in on two things first the PG&E has asked for an extension around their midterm reliability procurement mandate. 795 01:23:31,000 --> 01:23:42,000 Meaning that they weren't able to meet the deadlines set by the CPUC so the IOUs are seeing the same interconnection delays and challenges that we are seeing. 796 01:23:42,000 --> 01:23:53,000 I think that there are really three major issues so from a policy standpoint and how we're trying to engage in the regulatory space. 797 01:23:53,000 --> 01:23:59,000 The first Dennis mentioned which is appropriately resourcing. 798 01:23:59,000 --> 01:24:11,000 So the commission asked a few years ago tell us do you need more rate based work to be able to complete interconnections on time. 799 01:24:11,000 --> 01:24:21,000 Southern California Edison I believe their response was we do if you want to meet these goals this is what what it would cost and PG&E's response was. 800 01:24:21,000 --> 01:24:32,000 We're fine we we have gotten that and that's I can't give you an advice letter number but but it is their official response to the commission's request. 801 01:24:32,000 --> 01:24:41,000 And I think that's you follow the money where where is the focus and it's not currently in the interconnection space. 802 01:24:41,000 --> 01:24:48,000 The second area Dennis also mentioned which is the speculative nature the interconnection. 803 01:24:48,000 --> 01:25:01,000 A lot of focus has been about how to evaluate projects coming into the interconnection space but it's doing nothing to weed out the zombie projects that are currently eating up the interconnection space. 804 01:25:01,000 --> 01:25:09,000 And there's a new market that is happening which is the speculative market of your interconnection position. 805 01:25:09,000 --> 01:25:19,000 That is out there and it's happening and that's not helping get projects delivered any faster at a cheaper rate because it's a cost component. 806 01:25:19,000 --> 01:25:33,000 And then the third area I think is around tariff design and this isn't so much about renewable and generation pieces but evaluating standalone energy storage assets and how they interconnect. 807 01:25:33,000 --> 01:25:43,000 We have seen that you know we have to plan or the kysotaires require PG&E and the IOU's plan to a worst case scenario. 808 01:25:43,000 --> 01:26:01,000 So they are treating batteries as demand on the system even if we are willing to acknowledge or sign a covenant that would restrict our ability to charge the batteries so that we would only ever discharge in the net peak hours and never charge it. 809 01:26:01,000 --> 01:26:09,000 They still have to plan as though we may act in that sort of non-responsible and non-economic manner. 810 01:26:09,000 --> 01:26:24,000 And that needs to be evolved because battery storage the number of projects they're waiting to be interconnected is just growing 100 fold over and over again across the kysotan interconnection cues. 811 01:26:24,000 --> 01:26:32,000 So I would say those three areas are areas that there are solutions in the interconnection space but they're difficult to do. 812 01:26:32,000 --> 01:26:38,000 Thank you both. 813 01:26:38,000 --> 01:26:46,000 I don't see any more council member comments I have a couple of questions. 814 01:26:46,000 --> 01:26:53,000 The rates that we're looking at in the current proposals that you're evaluating now for what our costs will be. 815 01:26:53,000 --> 01:26:58,000 How does that fit in with our rates for our customers? 816 01:26:58,000 --> 01:27:01,000 Is it going to have a big effect or is it still? 817 01:27:01,000 --> 01:27:04,000 I know we have a lot of other costs besides just the power cost. 818 01:27:04,000 --> 01:27:09,000 Is it going to have a significant pressure on pushing our rates up? 819 01:27:09,000 --> 01:27:15,000 Power costs are about 92 to 94% of our total budget. 820 01:27:15,000 --> 01:27:22,000 So it's a significant cost but as we move forward the PPAs are still generally a planned cost. 821 01:27:22,000 --> 01:27:31,000 So when we're procuring energy we're not necessarily operating to beat the market over a 20 or 25 year PPA. 822 01:27:31,000 --> 01:27:35,000 We're looking to stabilize and be able to plan around those costs. 823 01:27:35,000 --> 01:27:42,000 But when you're taking such a long-term view it is important to step back and say where are we in the market today. 824 01:27:42,000 --> 01:27:46,000 In 2028 we saw significantly different prices. 825 01:27:46,000 --> 01:27:52,000 Some more than 100% lower than we are today. 826 01:27:52,000 --> 01:28:01,000 So this is a significant change and we need to be able to step back and be purposeful in how we're considering projects. 827 01:28:01,000 --> 01:28:07,000 So I'm sorry I didn't quite get the sort of bottom line if in terms of our current rates today. 828 01:28:07,000 --> 01:28:16,000 If it's likely to put upward pressure on those if we were to sign contracts at the rate you're getting proposals right now. 829 01:28:16,000 --> 01:28:19,000 I think it's one consideration right that we look at that. 830 01:28:19,000 --> 01:28:24,000 We also have regulatory obligations that we also have to meet. 831 01:28:24,000 --> 01:28:33,000 So we're looking at the whole schedule of things affordability costs impact on rates but also compliance meeting our compliance. 832 01:28:33,000 --> 01:28:36,000 There's the midterm reliability obligation. 833 01:28:36,000 --> 01:28:41,000 There's our obligations and of course achieving our goal here. 834 01:28:41,000 --> 01:28:48,000 But I think that the cost consideration is an important one and it's part of our decision. 835 01:28:48,000 --> 01:28:55,000 It's difficult chair to give you a bottom line of signing a cost equals a percentage increase in rates. 836 01:28:55,000 --> 01:29:06,000 It is an important component but we analyze every one of these projects from the criteria established by the policy board. 837 01:29:06,000 --> 01:29:12,000 That criteria means that we're going to look at the load serving energy and responsibilities. 838 01:29:12,000 --> 01:29:15,000 But we're also going to look at the value of the project in the market. 839 01:29:15,000 --> 01:29:21,000 There's a price that we pay, a fixed price that we pay but how can we utilize that asset in the energy markets. 840 01:29:21,000 --> 01:29:32,000 So it's value today may change as we move forward over the value of the duration of the contract based on the energy market where the energy market sits. 841 01:29:32,000 --> 01:29:41,000 So I would say as a roll of thumb it's not a good idea to sign a bunch of contracts at the highest point in the 25 year period. 842 01:29:41,000 --> 01:29:54,000 But the value of those products over that duration of that PPA is going to depend very heavily on how you operate it and the conditions of the market and which you're operating it in. 843 01:29:54,000 --> 01:29:57,000 No crystal balls involved. 844 01:29:57,000 --> 01:30:00,000 Really big data analytic tools. 845 01:30:00,000 --> 01:30:09,000 The other thing I wanted to ask is there's been a lot in the press lately about federal regulatory action on trying to make it easier to put power lines in. 846 01:30:09,000 --> 01:30:27,000 And when you talk about the low-hanging fruit, that transmission capacity is getting to be a bigger, bigger factor in terms of, I mean, you have the interconnection issues with the delays with the utilities doing the engineering and whatever they have to do on there. 847 01:30:27,000 --> 01:30:30,000 But also just the capacity issues in the grid. 848 01:30:30,000 --> 01:30:41,000 And do you see any, are we getting to the point now where a lot of these projects are being built in the central valley and then sending energy to the coast? 849 01:30:41,000 --> 01:30:51,000 Are we starting to see transmission bottlenecks that are going to be a factor in where projects are located? 850 01:30:51,000 --> 01:30:56,000 Especially if it's taking eight to ten years to build a new transmission line. 851 01:30:56,000 --> 01:31:00,000 I think it takes much longer to build a new transmission line. 852 01:31:00,000 --> 01:31:06,000 I think that the challenge is more as generation moves further away from loads. 853 01:31:06,000 --> 01:31:17,000 So when you get into isolated areas like the Owens Valley, Nevada, parts of New Mexico, that transmission capacity and bringing it into kiso. 854 01:31:17,000 --> 01:31:24,000 That's where the real investment needs to occur because, again, that's where projects, that's where the wind is. 855 01:31:24,000 --> 01:31:30,000 So that's where that will go. That's where some of the low cost energy or low cost of land is for sighting solar. 856 01:31:30,000 --> 01:31:36,000 And then that's where some of the geothermal is. And so with renewables, you've got to go to where that resource is. 857 01:31:36,000 --> 01:31:43,000 So as you get further away from load, you've got to have the transmission capacity that may be new lines. 858 01:31:43,000 --> 01:31:49,000 It may be reengineering and Dennis can help me on the term. 859 01:31:49,000 --> 01:31:55,000 But changing the capacity carrying capabilities of existing lines. 860 01:31:55,000 --> 01:31:58,000 Okay, thank you. 861 01:31:58,000 --> 01:32:06,000 Not seeing any other hands from the council, I wonder if we have any public comment on this item. 862 01:32:06,000 --> 01:32:13,000 Yes, we do have public comment, but Garrett, we're ready for you. 863 01:32:13,000 --> 01:32:21,000 Hi, yeah, this is Brett Garrett and Santa Cruz and as we're moving to the 100% clean and renewable goal. 864 01:32:21,000 --> 01:32:30,000 I just want to strongly urge a strong emphasis on low-core renewable generation within 3 CE territory, even if it costs more. 865 01:32:30,000 --> 01:32:38,000 As I was just hearing some of you talk about how, you know, in order to use these renewables, we need to build transmission. 866 01:32:38,000 --> 01:32:44,000 But if we could build the renewables here in our region, then that additional transmission wouldn't be needed. 867 01:32:44,000 --> 01:32:48,000 It would just, the whole thing would work so much smoother. 868 01:32:48,000 --> 01:32:51,000 Lock over renewables, reduce the need for transmission infrastructure. 869 01:32:51,000 --> 01:33:04,000 We currently have kind of an insane billing structure in California, at least in the IOU territory, which means I need to pay the same transmission chart regardless of where the energy was generated. 870 01:33:04,000 --> 01:33:13,000 But I am very hopeful that someday we will have a more reasonable system with minimal transmission charges for low-core energy. 871 01:33:13,000 --> 01:33:28,000 The clean coalition, for example, has a detailed proposal, including draft legislation to reform the transmission access charges, so that they would actually be based on how nearby the energy is included. 872 01:33:28,000 --> 01:33:37,000 But even our current environment, it's a really good idea to reduce the need for transmission infrastructure by building our resources locally. 873 01:33:37,000 --> 01:33:46,000 Local generation can also create local jobs, so please give a preference to some local projects. 874 01:33:46,000 --> 01:33:48,000 Thank you. 875 01:33:48,000 --> 01:33:51,000 Thank you. 876 01:33:51,000 --> 01:33:53,000 Do we have any other public comment? 877 01:33:53,000 --> 01:33:56,000 That was a final public comment, Chair. 878 01:33:56,000 --> 01:33:59,000 Okay. Thank you. 879 01:33:59,000 --> 01:34:02,000 Does that conclude your CEO's report? 880 01:34:02,000 --> 01:34:04,000 It does, Chair. Thank you. 881 01:34:04,000 --> 01:34:08,000 All right. Thank you. 882 01:34:08,000 --> 01:34:21,000 So the next item on our agenda is a request that we support policy boards consideration of the behind-the-meter battery rebate program. 883 01:34:21,000 --> 01:34:36,000 Again, yes, this item is asking the CAC to support policy board consideration of our proposed behind-the-meter battery rebate program. 884 01:34:36,000 --> 01:34:47,000 And again, I will invite our Director of Energy Programs, Chris Cook, to present this item. 885 01:34:48,000 --> 01:34:50,000 Thank you. 886 01:34:50,000 --> 01:34:57,000 So as mentioned, this will be a presentation on three Cs for a pose behind-the-meter residential battery rebate program. 887 01:34:57,000 --> 01:35:07,000 So I spoke to this a little bit in the demand response work plan, but this presentation goes into some more detail on that. 888 01:35:07,000 --> 01:35:16,000 So first of all, as mentioned previously with the battery rebate program, this would allow for load shifting to occur. 889 01:35:16,000 --> 01:35:26,000 So essentially enabling the electricity consumption to shift off of those peak demand hours. 890 01:35:26,000 --> 01:35:39,000 And in turn, allowing for the benefits that was previously discussed of using cleaner renewable power, reduced overall costs of customers and purchase of the power, 891 01:35:39,000 --> 01:35:48,000 and then increased resiliency for the grid, and I would add increased reliability for customers. 892 01:35:48,000 --> 01:35:53,000 So then getting into more of the details of the battery rebate program. 893 01:35:53,000 --> 01:35:58,000 You can see on the chart on the right, there's two different rebate mounts. 894 01:35:58,000 --> 01:36:03,000 So the first one would be for our three CE choice and prime customers. 895 01:36:03,000 --> 01:36:13,000 These are customers who either non-solar or they're getting solar at the time of the battery install. 896 01:36:13,000 --> 01:36:19,000 And they would have a rebate amount of $300 per kilowatt hour. 897 01:36:19,000 --> 01:36:24,000 So an average residential battery might be about 13 kilowatt hours. 898 01:36:24,000 --> 01:36:33,000 So that would equate to approximately $3,900 rebate or about 20 to 30% of a battery install cost. 899 01:36:33,000 --> 01:36:48,000 So in looking at, then looking at for customers that may be already had solar, they could be a NEM 1.0 2.0 customer and the requirement that they 900 01:36:48,000 --> 01:36:56,000 become they go on to NBT or also for care, fairer, and medical baseline customers. 901 01:36:56,000 --> 01:37:07,000 They would have a $500 per kilowatt hour rebate, which, again, for a 13 kilowatt hour battery, would be approximately $6,500. 902 01:37:07,000 --> 01:37:13,000 And I would note that for these income qualifying customers, there's other rebates too. 903 01:37:13,000 --> 01:37:24,000 With other agencies or IOS where you can stack those and they might be able to get up to 100% of the cost of the battery through the various programs. 904 01:37:24,000 --> 01:37:34,000 So with these rebates and the new program we're anticipating approximately 400 battery install per year, 905 01:37:34,000 --> 01:37:40,000 which would equate to a budget of approximately $2 million per year for the incentives. 906 01:37:40,000 --> 01:37:50,000 And for eligibility, we would be looking for this fiscal year, any batteries that were installed after January 1, 2024. 907 01:37:50,000 --> 01:37:55,000 As part of that rebate, we would be requiring several items. 908 01:37:55,000 --> 01:38:06,000 First of all, they would be required to discharge at least 50% of their capacity during the peak hours of 4 PM to 9 PM. 909 01:38:06,000 --> 01:38:10,000 And we'd be able to do tracking to be able to verify that. 910 01:38:10,000 --> 01:38:14,000 Also they would need to be enrolled in the net billing tariff rates. 911 01:38:14,000 --> 01:38:21,000 So if they're currently a NEM 1.0 or 2.0 they would have to switch over the net billing tariff rates. 912 01:38:21,000 --> 01:38:29,000 And additionally as previously discussed, they would need to be registered and signed up for a battery performance tracking methods, 913 01:38:29,000 --> 01:38:33,000 with some things that we could track their load shifting, 914 01:38:33,000 --> 01:38:40,000 show that they're registered in that tracking method that we would have prior to receiving the rebate. 915 01:38:40,000 --> 01:38:46,000 And then focusing in more on the income qualified customers, 916 01:38:46,000 --> 01:38:54,000 this is one where we took a look at it and really wanted to set a goal of participation for our care and phara customers. 917 01:38:54,000 --> 01:38:58,000 And our initial goal would be 15%. 918 01:38:58,000 --> 01:39:03,000 So this is based on for 3C's current NEM customers, 919 01:39:03,000 --> 01:39:06,000 13% of them qualify for care phara. 920 01:39:06,000 --> 01:39:12,000 So we're using that 13% going slightly higher to the 15 as an initial goal. 921 01:39:12,000 --> 01:39:16,000 That would equate to 60 rebates per fiscal year, 922 01:39:16,000 --> 01:39:25,000 approximately 300,000 annual expenditures or incentive rebates and 780 kilowatt hours of new energy storage, 923 01:39:25,000 --> 01:39:29,000 assuming 13 kilowatt hour of battery. 924 01:39:29,000 --> 01:39:35,000 And to achieve this we would have with our CNO team would do a targeted multi-lingual outreach. 925 01:39:35,000 --> 01:39:41,000 So this includes webinars, flyers, emails, social media. 926 01:39:41,000 --> 01:39:47,000 They've done similar outreach targeted efforts with our electrify year ride program. 927 01:39:47,000 --> 01:39:59,000 And we've seen really strong success with that in terms of participation for customers who could qualify for certain income programs. 928 01:39:59,000 --> 01:40:06,000 And so with that we'd be looking to meet or exceed the 15% participation. 929 01:40:06,000 --> 01:40:12,000 And then after the first six months or 500,000 rebates, 930 01:40:12,000 --> 01:40:20,000 we would go back and we'd evaluate how the percentage of participation within come qualified customers 931 01:40:20,000 --> 01:40:27,000 and if anything needs to be done to be able to reach more customers or meet that goal. 932 01:40:28,000 --> 01:40:39,000 And as mentioned previously, during that six months we'll also look at the overall program, the load shifting and other impacts that occurred. 933 01:40:39,000 --> 01:40:43,000 And to be able to do that overall review we'd have program tracking. 934 01:40:43,000 --> 01:40:51,000 So this is where a 3C staff or evaluating how to track battery performance we talked about this a little bit previously. 935 01:40:51,000 --> 01:40:55,000 We're looking at ensuring that as part of their enrollment process, 936 01:40:55,000 --> 01:41:04,000 the customer would register for a tracking method where you could see the discharge and charge of the batteries with the load shifting verification. 937 01:41:04,000 --> 01:41:15,000 And that would correlate to the performance tracking that performance on both an individual customer basis being able to look at that and then aggregating those in different methods to be able to say, 938 01:41:15,000 --> 01:41:27,000 OK, the overall program after six months has achieved this much shift in load and then being able to see which customers are compliant. 939 01:41:27,000 --> 01:41:36,000 So then for this new program, we have this project delivery schedule that our energy programs team has been working on. 940 01:41:36,000 --> 01:41:58,000 There's been there was work on design of the of the program application wording and now it's really focused on being able to make sure it integrates with our customer relationship management software and also CNOs outreach efforts. 941 01:41:58,000 --> 01:42:05,000 And overall we'd be looking at a late June early July start of this program. 942 01:42:05,000 --> 01:42:16,000 So with that, this recommends that the 3C, CAC support seeking policy board consideration and support of 3C's proposed behind the meter residential battery rebate program. 943 01:42:16,000 --> 01:42:18,000 Thank you. 944 01:42:18,000 --> 01:42:20,000 Thank you. 945 01:42:20,000 --> 01:42:22,000 Council member Sedan. 946 01:42:22,000 --> 01:42:25,000 Thank you, Chris good presentation. 947 01:42:25,000 --> 01:42:32,000 My comment is that rather than have a rebate which reaches back to before the program even started. 948 01:42:32,000 --> 01:42:43,000 Why not have an incentivized program that actually ties us people to go out and pushes them over the edge to get a battery instead of just paying for battery. 949 01:42:43,000 --> 01:42:58,000 Once they happen to hear about a rebate, this is a dilemma we've had with electric vehicles whether we're just paying for people to purchase a vehicle or lease a vehicle or we trying to drive them into the vehicle by using you know this. 950 01:42:59,000 --> 01:43:07,000 So I just think that you know paying for people that will find out about this. Oh great. I already already wanted to do this. 951 01:43:07,000 --> 01:43:16,000 This is already important to me and I did it but now I can get additional money from 3CE which could have been used to entice people to go that way. 952 01:43:16,000 --> 01:43:20,000 Yeah, that's a great point. I have a couple items on that first of all. 953 01:43:21,000 --> 01:43:45,000 I think that in terms of kind of making certain that we're part of that decision making process our team has been doing already webinars with solar installers and others to make sure that you know they're getting the message on the front end and you know the battery manufacturers can know about it and others so that you know when the customers coming looking at options they can be able to speak to that as part of it. 954 01:43:45,000 --> 01:44:01,000 And then in terms of that January 1st date others might have other responses on this but one of the things that I noticed is in my neighborhood there are two batteries that people installed and all of us as neighbors came and asked a million questions of them. 955 01:44:01,000 --> 01:44:13,000 So I think there's also something to be said for if a battery was recently installed and that person can be a steward for the program and say oh well you know if you do this you get an additional rebate and in that way. 956 01:44:14,000 --> 01:44:23,000 Further motivate people who might be interested but a good a good point in terms of trying to close stay in front of the purchase as much as possible especially moving forward. 957 01:44:25,000 --> 01:44:27,000 Councilmember Bowman. 958 01:44:27,000 --> 01:44:40,000 Thank you. So in terms of the rebate because it's based on energy use would this be a perpetual obligation of three CE to continue to pay through the life cycle of the battery. 959 01:44:40,000 --> 01:44:49,000 Yeah, so so what it is is it's actually so it is energy in terms of kilowatt hours like how much can be stored in the battery. 960 01:44:49,000 --> 01:45:00,000 But it's it's the it's not the demand side like the power side so it's just a one time upfront rebate right now and from what we've initially heard it. 961 01:45:00,000 --> 01:45:25,000 And I think if I can just add one clarification just because listeners in the public may hear it and it's an important distinction. It's not energy, it's it's capacity. So it's the size of the battery, not the individuals usage. So the incentive is based on the capacity of the battery. 962 01:45:25,000 --> 01:45:35,000 Thank you. And then for the customers that do not have solar is our way to explain to the customer what their return on investment will be. 963 01:45:35,000 --> 01:45:43,000 So in other words, if they make this purchase, you know, how long will it be before they quote unquote get their money back? 964 01:45:43,000 --> 01:45:53,000 Yeah, and that is something that we are looking at and one of the key drivers on that is the price of of electricity during peak and off peak hours. 965 01:45:53,000 --> 01:46:11,000 So it in some initial work that I was looking at, it's pretty much doubled during the peak hours versus off peak. So you can use that to be able to look at it in the life of the battery and communicate some of the incentives that way beyond just, you know, back up power that a lot of people think of. 966 01:46:11,000 --> 01:46:15,000 So absolutely. 967 01:46:16,000 --> 01:46:20,000 As I have a question here in Samaria, I just wanted to clarify. 968 01:46:20,000 --> 01:46:30,000 For existing them customers, they, everyone has to go under MBT to qualify for the re-aids. Is that correct? 969 01:46:30,000 --> 01:46:38,000 Yes, that is correct. They would have to switch over to the net billing tariff before qualifying for the rebate. 970 01:46:38,000 --> 01:46:49,000 I wouldn't think we would have to have really good documentation explaining exactly what is going to change with their existing solar when they do that. 971 01:46:49,000 --> 01:46:54,000 That is a big, big shift. 972 01:46:54,000 --> 01:46:59,000 And one that I would imagine most people would clearly understand it probably would not do. 973 01:47:00,000 --> 01:47:11,000 For the customers who are MBT already, five of the existing solar, that's a tricky equation. 974 01:47:11,000 --> 01:47:24,000 And that is something that we have looked at in terms of that's perspective too, but that's a great point and we will work on talking points on that too. 975 01:47:25,000 --> 01:47:27,000 Thank you. 976 01:47:27,000 --> 01:47:42,000 And on the theme of Dr. Balman's question, do you anticipate doing any education for prospective customers around the financial benefits of them of having battery backup? 977 01:47:42,000 --> 01:47:50,000 It's great that you're going to ask them to discharge during the peak that actually helps them a great deal in their bottom line. 978 01:47:50,000 --> 01:47:55,000 But I think a lot of people think of batteries as a resilience measure. 979 01:47:55,000 --> 01:48:03,000 I certainly did when I installed a couple of Tesla walls a few years ago, because of blackouts, where I get my power and so forth. 980 01:48:03,000 --> 01:48:10,000 But it turns out that actually using your battery in a creative way saves you a lot of money. 981 01:48:10,000 --> 01:48:16,000 And while I knew we ended that, so have you got any idea of how you would educate folks about that? 982 01:48:16,000 --> 01:48:21,000 It's important to note that these are going to be installed through solar installers. 983 01:48:21,000 --> 01:48:26,000 So the goal here is that driver behind this isn't necessarily an incentive we're offering. 984 01:48:26,000 --> 01:48:35,000 The driver is the way the net billing tariff is changing the billing mechanism and how customers extract value from that system. 985 01:48:35,000 --> 01:48:39,000 So we want to encourage battery adoption. 986 01:48:39,000 --> 01:48:42,000 The real driver is going to be the tariff structure. 987 01:48:43,000 --> 01:48:56,000 The benefit here is that it's our local solar installers that have the opportunity to go to existing customers and to new customers with an incentive. 988 01:48:56,000 --> 01:49:09,000 And anyone that's gone through this process knows that the installers will give you estimated ranges of your return on investment, how you utilize, how you size, what your history of energy usage is. 989 01:49:09,000 --> 01:49:13,000 And a summary of what demand response programs are currently available. 990 01:49:13,000 --> 01:49:18,000 So a lot of that information comes from those solar installers. 991 01:49:18,000 --> 01:49:26,000 We're working closely with them so that they're aware of the program, getting feedback from them about how that program is going to operate. 992 01:49:26,000 --> 01:49:30,000 You know, to Councilmember McClish's comment. 993 01:49:30,000 --> 01:49:38,000 I think the reality here is we want to design a program that's available to everybody, whether they have solar on the rooftop or not. 994 01:49:38,000 --> 01:49:43,000 If they want a battery only and be a grid fed battery customer, they can do that. 995 01:49:43,000 --> 01:49:51,000 I think we can all be grown up enough to realize that the solar installers are who are going to be having these customer conversations. 996 01:49:51,000 --> 01:49:54,000 And they're going to encourage customers to put solar on their roof. 997 01:49:54,000 --> 01:49:59,000 But the design of the program shouldn't presuppose that they have to do that. 998 01:49:59,000 --> 01:50:04,000 So that's the mechanism here and that return on investment, how you're going to operate. 999 01:50:04,000 --> 01:50:12,000 A lot of that education comes from the solar installers and we're going to continue that communication with them and partnership with them. 1000 01:50:12,000 --> 01:50:20,000 So that they understand how the program works and so that they're communicating directly to customers around how to utilize these assets. 1001 01:50:20,000 --> 01:50:22,000 My experience of solar installers. 1002 01:50:22,000 --> 01:50:26,000 I feel like I had a particularly good one. 1003 01:50:27,000 --> 01:50:34,000 Sort of all over the map in terms of their ability to articulate to the customer. 1004 01:50:34,000 --> 01:50:40,000 They can certainly articulate the benefits of the customer on the solar and the generation and all that kind of thing. 1005 01:50:40,000 --> 01:50:44,000 But the other the flip side of that is here's a battery. 1006 01:50:44,000 --> 01:50:51,000 And oh sure you just need to go and download the app and it'll tell you how to use it cleverly so you can save money. 1007 01:50:51,000 --> 01:50:56,000 It's pretty much what the guidance we got from our particular install for our battery. 1008 01:50:56,000 --> 01:51:08,000 So I mean I don't know if it would be useful at some point if you find that you're not getting as much of it uptake as you'd like to provide some training to the solar installers. 1009 01:51:08,000 --> 01:51:20,000 Not sure because I think just benefit of the quality of how they approach their own customers and how they educate their customers is not consistent. 1010 01:51:20,000 --> 01:51:24,000 So thanks. 1011 01:51:24,000 --> 01:51:30,000 And one question I had that I wanted to kind of circle back around on was the switch over to the net billing tariff. 1012 01:51:30,000 --> 01:51:33,000 Is there any way that that can be appealed at all? 1013 01:51:33,000 --> 01:51:35,000 Is that a CPUC regulation? 1014 01:51:35,000 --> 01:51:45,000 I'm not familiar enough with that to understand but I think in order to bring on customers that are on them one and them two is maybe the possibility that they could appeal that. 1015 01:51:45,000 --> 01:51:55,000 That change in status to net billing tariff because I think financially that's going to be a much better story to tell in terms of battery backup or battery storage. 1016 01:51:55,000 --> 01:52:06,000 So I wasn't sure if that was a CPUC guideline or regulation if you could comment on that and if there's a possibility that we could get a waiver and appeal to that switch over to NBT would I think would be huge. 1017 01:52:06,000 --> 01:52:12,000 You see allows us to add battery through the existing analysis without changing the depth estimation. 1018 01:52:13,000 --> 01:52:14,000 Yeah. 1019 01:52:14,000 --> 01:52:23,000 So the change to NBT is either you know not sure who's required that but it's if you see isn't right now. 1020 01:52:23,000 --> 01:52:24,000 So. 1021 01:52:24,000 --> 01:52:28,000 If you have a source of the system you have to change but a battery by itself. 1022 01:52:29,000 --> 01:52:44,000 I can't remember damners I want to make sure I understand your question you're asking is as the design of the program the requirement of eligibility that you move early to NBT whether that's required. 1023 01:52:44,000 --> 01:52:46,000 Okay. 1024 01:52:46,000 --> 01:52:57,000 The answer is no that's not required by the CPUC that is required as part of our proposal because the policy board direction was was really too full. 1025 01:52:57,000 --> 01:53:11,000 One we want to reduce the subsidy that's being paid to solar customers so that non solar customers aren't subsidizing free electricity to solar enabled customers. 1026 01:53:11,000 --> 01:53:23,000 And then adding an additional benefit to those customers that are already getting free electricity at the expense of non solar customers who tend to be lower income. 1027 01:53:23,000 --> 01:53:32,000 Of apartment dwelling customers so the first direction than the CP or from the policy board was reduced the subsidy. 1028 01:53:32,000 --> 01:53:45,000 The second direction was to encourage battery adoption and then the third direction was to give customer tools and ability to be able to respond in future demand response programs. 1029 01:53:45,000 --> 01:53:49,000 So this is taking those steps to be able to do so. 1030 01:53:49,000 --> 01:54:05,000 The battery incentive available to them one and two customers who are already getting subsidies that the commission is determined or out of whack with California's policies and goals would not meet that first objective of reducing the customer subsidy. 1031 01:54:05,000 --> 01:54:15,000 The early transition to NBT that is defined as I think one full billing cycle before their grandfathering period would run. 1032 01:54:15,000 --> 01:54:26,000 So a customer could move early really at any point that the IOU and their billing cycle and I'm sure that we'll be working with installers so they can explain that to customers. 1033 01:54:26,000 --> 01:54:41,000 It allows customers to move early to NBT but early is can be late when you're talking about a 20 year grandfathering period. 1034 01:54:42,000 --> 01:55:05,000 Just a quick note I believe this the batteries may be eligible for the residential clean energy IRS credit which is like 30% so if that can be included in the customer information and so forth that so between years and and that credit makes it quite a bit more affordable. 1035 01:55:05,000 --> 01:55:29,000 I had a follow a question on that is that I know when I put batteries in to get the credit it had to be powered by solar and you can't charge the battery under at least you know the regulations when I install batteries can't charge off the grid and put it back in the grid you can only charge from solar if you're going to get that tax credit has that changed under the IRA. 1036 01:55:29,000 --> 01:55:39,000 I'm not familiar with non grid charge component of the IRA that would limit the ability for that but we will look into that. 1037 01:55:39,000 --> 01:55:47,000 Okay yeah it was always tied to the solar tax credit before so it had to sort of be part of your solar system in order to qualify. 1038 01:55:48,000 --> 01:56:02,000 And I would add for low income customer qualifications there's others to like S chip and others that provide significant rebate so there's a number of programs out there. 1039 01:56:03,000 --> 01:56:04,000 Thank you chair. 1040 01:56:05,000 --> 01:56:11,000 These are all really good questions and I guess I'd like to put a bow around let me ask first I think this a yes or no. 1041 01:56:12,000 --> 01:56:19,000 Is this being presented for recommendation to to this CIC for the first and only time tonight. 1042 01:56:21,000 --> 01:56:31,000 Well I missed last meeting so yeah so so we are looking to launch this program end of June early July so we will be. 1043 01:56:33,000 --> 01:56:37,000 Looking to launch it before you know an XCAC meeting potentially. 1044 01:56:38,000 --> 01:56:47,000 However like I mentioned we're going to be going through evaluations and looking at how it's doing and I can definitely see if there's a recommendation to bring it back that. 1045 01:56:48,000 --> 01:56:51,000 So this is the first time the CAC seeing it. 1046 01:56:51,000 --> 01:56:55,000 So it's a lot of good comments here from a number of the members I think. 1047 01:56:55,000 --> 01:57:01,000 And I think I I would summarize adding on to what I've heard from others. 1048 01:57:02,000 --> 01:57:05,000 I think what's missing in this is there's no real. 1049 01:57:06,000 --> 01:57:12,000 Radi impact or cost benefit analysis there's no financials here for us to evaluate the efficacy of the program. 1050 01:57:13,000 --> 01:57:20,000 You know there's which we're kind of doing back at the envelope calculations is to what's what's the benefits of the customer. 1051 01:57:20,000 --> 01:57:31,000 You're preserving 40% of their capacity you're rebating in 20 to 30% there's a there's an additional there's additional rebates that could make it more attractive. 1052 01:57:32,000 --> 01:57:37,000 I know I'd be reluctant to give up 50% of my power except there is the. 1053 01:57:38,000 --> 01:57:47,000 I'm I'm sorry I'm I'm trying to mix it all together because I'm not seeing that and there's no analysis here that helps the customers that we're trying to incentivize. 1054 01:57:47,000 --> 01:57:53,000 Understand why they would want to participate in this program as Mr. Steadon said and move. 1055 01:57:54,000 --> 01:57:58,000 As a result of this not just because they're trying to backfill paying for their battery. 1056 01:57:59,000 --> 01:58:05,000 And the second is it's hard for me to to recommend this although I'm sure I will. 1057 01:58:06,000 --> 01:58:11,000 As to you know the efficacy what what's are we are we spent and are we spent in. 1058 01:58:11,000 --> 01:58:22,000 We spent in 3 CE money wisely here with this rebate program and I don't see any any any analysis that would indicate that so that's my my comment back on this program. 1059 01:58:23,000 --> 01:58:25,000 Yeah absolutely so. 1060 01:58:26,000 --> 01:58:34,000 So as I mentioned in terms of the overall program I would like to kind of take a step back and remind that it's also. 1061 01:58:34,000 --> 01:58:53,000 So load shifting overall that we're achieving with this so it's I mean price is a component of it because as I mentioned you know the price during peak hours is significantly different for both the customer and 3 CE so benefits everybody for somebody doing this load shifting versus off peak. 1062 01:58:54,000 --> 01:59:00,000 But then you also have that clean renewable component that we're talking about you also have. 1063 01:59:01,000 --> 01:59:19,000 The the reliability component for backup of power and you know we did do some preliminary work it's still in development so it's not something I could present here but we did look at okay the life cycle of a battery the peak versus off peak. 1064 01:59:19,000 --> 01:59:30,000 And and what that could mean for a customer given the rebate given a cost of a battery and it did look like something that would be cost effective for a customer but I think. 1065 01:59:31,000 --> 01:59:46,000 In my mind at least it's a whole package of benefits including clean renewable reducing emissions and adding reliability and reducing grid stress and the cost so I would not see it as just one item that's benefiting. 1066 01:59:46,000 --> 02:00:00,000 And and and it may not be the sole reason why somebody buys a battery but it definitely motivates them additionally to buy it would be my right and and and as you said in your earlier presentation I think I asked. 1067 02:00:00,000 --> 02:00:24,000 Do you have to put solar in to get these batteries rebate program? And I think the answer I got was no. So not necessarily all those benefits would apply in that circumstance. There's Ms. Johnson points out somebody like, and I know people have done this. They put their Tesla walls in just because they want that resiliency that backup power. And we don't necessarily want to reward those folks, because there's no real grid benefits for that. 1068 02:00:24,000 --> 02:00:36,000 So I guess I'm just not seeing that my comment is I'm not seeing the analysis that would indicate for me as a CAC member to recommend this. 1069 02:00:36,000 --> 02:00:47,000 What is it is a good bank for the buck, and I'm not seeing how the customer evaluates whether or not this is something that incentivizes them properly. 1070 02:00:47,000 --> 02:01:05,000 Let me step in. I disagree with the premise that using the battery for our backup purposes doesn't help the grid and that being grid fed for the battery doesn't have a demand response or load shifting capability. 1071 02:01:05,000 --> 02:01:16,000 So the analysis is really through the net billing tariff. That is the structure by which you're really excuse me. That's not true. 1072 02:01:16,000 --> 02:01:27,000 So the driver here is how does an economic person utilize their battery if they're going to be discharging the battery to the grid. 1073 02:01:27,000 --> 02:01:44,000 They must be on a them program. So they do not have to have solar. So they could be grid fed with the battery. If they want to be grid entitled with the battery and not have a discharging capabilities, then there's still some load shifting that they could do, but they wouldn't be eligible for our program. 1074 02:01:44,000 --> 02:02:00,000 At the end of the day, this is an investment in trying to operationalize this. That's what the texture platform is utilized for monitoring behavior and whether or not the batteries are being utilized, how we can educate and then add additional tools. 1075 02:02:00,000 --> 02:02:13,000 It's important, I think, from my perspective, that where are the CEC and the Commission going to? The CEC is going to real-time pricing. They're requiring that all load serving entities build real-time pricing. 1076 02:02:13,000 --> 02:02:24,000 And if there isn't a battery, if customers don't have tools to be able to respond to real-time pricing, charging their battery and low cost hours utilizing that energy in the high peak dollar hours, 1077 02:02:24,000 --> 02:02:33,000 then customers are going to be hurt tremendously during that time period. Because what customers won't do is follow when is the off peak hour. 1078 02:02:33,000 --> 02:02:38,000 Those of us that have an electric car or some reason to look at it, we will look at that. 1079 02:02:38,000 --> 02:02:51,000 But the net peak time period and time of use time periods changed dramatically. As you know, probably when you are on the CEC, we were telling everybody don't use electricity between the hours of noon and two. 1080 02:02:51,000 --> 02:02:57,000 That's not what we tell them now, because there is a glut of renewable energy that's available in those low cost high solar hours. 1081 02:02:57,000 --> 02:03:00,000 Actually, there's another rate structure still set up for that. 1082 02:03:00,000 --> 02:03:10,000 I don't think it is. The off peak hours are now in the middle of the day and your high cost hours are in the end of the day. 1083 02:03:10,000 --> 02:03:17,000 So those are the changes that are coming and this is an investment in preparing customers to be able to respond to those costs. 1084 02:03:17,000 --> 02:03:24,000 And the cost benefit of how we structure this is something that will continue to monitor as we move forward. 1085 02:03:24,000 --> 02:03:32,000 But it's currently within budget entirely. I think that's important to note as well that, you know, we don't need an augmentation or additional budget. 1086 02:03:32,000 --> 02:03:36,000 We have the program budget to be able to move forward with the program. 1087 02:03:36,000 --> 02:03:43,000 Well, thank you and it's a lot of esoteric discussion on my part there and I apologize, but it's just I'm not seeing the financials. 1088 02:03:43,000 --> 02:03:53,000 I'm not seeing the analysis in this two and a half pages to really provide you with I think a good recommendation. 1089 02:03:53,000 --> 02:03:55,000 Council Member Steadman. 1090 02:03:55,000 --> 02:03:56,000 Yeah. 1091 02:03:56,000 --> 02:03:59,000 This is an esoteric, so don't don't worry. 1092 02:03:59,000 --> 02:04:02,000 So what happens is this first come person. 1093 02:04:02,000 --> 02:04:13,000 Once you spend up to the a lot of budgeted amount or do you have a provision to revisit it and perhaps fund additional amounts to that program. 1094 02:04:13,000 --> 02:04:20,000 Yes, so that will be part of that first 500,000 or six months to do a reevaluation of it. 1095 02:04:20,000 --> 02:04:22,000 So we want to see what the participation is. 1096 02:04:22,000 --> 02:04:28,000 We want to evaluate from there. I mean, we have talked with people in the industry see what they're thinking. 1097 02:04:28,000 --> 02:04:39,000 There's other CCA students, we have a sense of what it would do, but yes, we're going to look back and evaluate at that point. 1098 02:04:39,000 --> 02:04:42,000 Council Member Bowman. 1099 02:04:42,000 --> 02:04:49,000 So you presented a lot of compelling arguments why this should go forward and intuitively it makes sense to me. 1100 02:04:49,000 --> 02:05:04,000 But to our Mr. Byron's comments, perhaps I could make a motion that we move this item requesting that you provide the operational boards to go to them and to the policy board more analysis. 1101 02:05:04,000 --> 02:05:15,000 And simple to understand terms for customers what the advantage to the customer will be what options they have for tax rebates both with solar and on solar. 1102 02:05:15,000 --> 02:05:20,000 And to the comment, I think came from San Luis Obispo, what will mean to solar customers. 1103 02:05:20,000 --> 02:05:25,000 And in that way, those boards can have that information before them. 1104 02:05:25,000 --> 02:05:32,000 But I think conceptually, at least for myself, I would say that this is a promising proposal. 1105 02:05:32,000 --> 02:05:38,000 And I think with those analyses, they'll have the information they need to make a good decision. 1106 02:05:38,000 --> 02:05:43,000 I'll second Dr. Mohammed's motion, thanks. 1107 02:05:43,000 --> 02:05:48,000 Could you restate your motion, please? 1108 02:05:48,000 --> 02:05:59,000 That we move this item forward requesting that the financial analysis that Mr. Byron referred to are presented to the operational board and ultimately the policy board. 1109 02:05:59,000 --> 02:06:04,000 So they have the information they need to make a good financial decision. 1110 02:06:04,000 --> 02:06:08,000 It's just one correction, the operations board has seen this already. 1111 02:06:08,000 --> 02:06:10,000 So we're just going forward to the policy board. 1112 02:06:10,000 --> 02:06:15,000 So if you would adjust your motion in that regard, so I'm at it. 1113 02:06:15,000 --> 02:06:19,000 Thank you. 1114 02:06:19,000 --> 02:06:22,000 I have a couple of questions and comments. 1115 02:06:22,000 --> 02:06:31,000 I wanted to mention that this program was recommended by our CAC through the ad hoc committee work three years ago. 1116 02:06:31,000 --> 02:06:34,000 It's one of the programs that we suggested we move forward with. 1117 02:06:34,000 --> 02:06:39,000 And in terms of one of the things you were talking about, Jeff, a 50% reserve requirement. 1118 02:06:39,000 --> 02:06:43,000 I think most people who have battery backup. 1119 02:06:43,000 --> 02:06:48,000 You can set what your reserve requirement is it's usually 50% or less anyway. 1120 02:06:48,000 --> 02:06:51,000 So I don't think that would really impact people in their use of the battery. 1121 02:06:51,000 --> 02:06:58,000 You want to be able to use that battery for backing themselves up in the evening, 1122 02:06:58,000 --> 02:07:02,000 so that they're not using expensive electricity. 1123 02:07:02,000 --> 02:07:08,000 I just wondered, it seemed to me that and maybe you've gotten input from solar installers. 1124 02:07:08,000 --> 02:07:16,000 But it seemed to me that all new solar purchasers going forward are going to want to put batteries in. 1125 02:07:16,000 --> 02:07:21,000 So you could kind of assume that, you know, assuming that our communication is good, 1126 02:07:21,000 --> 02:07:27,000 that however many solar systems get installed in our service area, all of them are going to apply for this rebate. 1127 02:07:27,000 --> 02:07:32,000 And I'm wondering if you've looked at numbers to see what that's going to do to the volume. 1128 02:07:32,000 --> 02:07:38,000 Yeah, that's a great question. So that is where we got that 400 participants annually from. 1129 02:07:38,000 --> 02:07:49,000 There is approximately 4,100 new solar installers each year in the 3C area and about, you know, 9% do battery right now. 1130 02:07:49,000 --> 02:07:55,000 So that's going to be the initial amount and then we'd see from there what the intake would be. 1131 02:07:55,000 --> 02:07:58,000 So you're basing on the 9%? 1132 02:07:58,000 --> 02:08:07,000 So we would be, so we're basing it on the 9% of battery installers right now. 1133 02:08:07,000 --> 02:08:13,000 So if, you know, if they went up significantly and amount, yeah, we would have to look at that further. 1134 02:08:13,000 --> 02:08:16,000 Yeah, assuming that everybody did the rebate too, that was there. 1135 02:08:16,000 --> 02:08:17,000 Yeah. 1136 02:08:17,000 --> 02:08:19,000 Yeah, I think couple who's. 1137 02:08:19,000 --> 02:08:32,000 Yeah, I think it's solar is not a good cost proposition without a battery under the. 1138 02:08:32,000 --> 02:08:34,000 I'm doing them requirements. 1139 02:08:34,000 --> 02:08:35,000 That's right. 1140 02:08:35,000 --> 02:08:38,000 But yeah, for the most part, we need a battery now. 1141 02:08:38,000 --> 02:08:40,000 Yeah, and we have also. 1142 02:08:40,000 --> 02:08:48,000 Yeah, so I think I think that moving forward it will it sounds like there's already a pretty high percentage with the ones that are doing it now. 1143 02:08:48,000 --> 02:08:53,000 We are seeing with other CACs that are running similar programs. I think they're first. 1144 02:08:53,000 --> 02:08:59,000 We talked to one in a committee meeting and their first month they had that recently happened. 1145 02:08:59,000 --> 02:09:01,000 There was similar rebate levels. 1146 02:09:01,000 --> 02:09:04,000 They had approximately 30 participants that month. 1147 02:09:04,000 --> 02:09:09,000 So considering just one of the other CACs as a reference. 1148 02:09:09,000 --> 02:09:15,000 It's it's one that I think we'll just have to see within the first six months what we would get and. 1149 02:09:15,000 --> 02:09:18,000 Yeah, probably using that as a better reference. 1150 02:09:18,000 --> 02:09:21,000 I wonder if you have any information, you know, that. 1151 02:09:21,000 --> 02:09:27,000 In trying to make sure that we're serving all our customers and this is available for lower income customers. 1152 02:09:27,000 --> 02:09:28,000 We're kind of counting on. 1153 02:09:28,000 --> 02:09:35,000 Ask you up being part of the equation so that lower income customers conceivably could get a hundred percent of the cost covered. 1154 02:09:35,000 --> 02:09:36,000 Do you have any idea. 1155 02:09:36,000 --> 02:09:39,000 I haven't followed it the last couple of years. 1156 02:09:39,000 --> 02:09:48,000 How as ship funding is going are they are they are they is it being funded to the level of of demand or is it. 1157 02:09:48,000 --> 02:09:52,000 Do they run out of money halfway through the year every year like they used to. 1158 02:09:52,000 --> 02:09:54,000 That's a good question. 1159 02:09:54,000 --> 02:10:01,000 I I'd have to look back on that and get back to you in terms of their funding levels and whether that runs out at the end of the year not but I can check on that. 1160 02:10:01,000 --> 02:10:08,000 So I think that that would be something we want to be looking at contingently that we don't want this to just be kind of like solar used to be. 1161 02:10:08,000 --> 02:10:13,000 Something that benefited people of a lot of means. 1162 02:10:13,000 --> 02:10:22,000 And maybe think about other strategies to make sure we're serving our low income customers also in some component of this. 1163 02:10:22,000 --> 02:10:33,000 I was really glad to hear you talking about taking a look you know six months down the road and that we do have more program funding available conceivably so that if this program was. 1164 02:10:33,000 --> 02:10:41,000 And a strong response that potentially we'd be able to apply more program funding. 1165 02:10:41,000 --> 02:10:43,000 To continue it. 1166 02:10:43,000 --> 02:10:58,000 I just wondered if you could give us a look at where we are what what the staff's projections are you know is the end of last year it was it was somewhat disappointing that we were not utilizing a bigger percent of the funds that. 1167 02:10:58,000 --> 02:11:08,000 Or did it make available to us. Do you have any if you guys looked at sort of where you think we're going to be at the end of the year I know that you know there's a lot of variables it's hard to know but. 1168 02:11:08,000 --> 02:11:18,000 Do you do you see the possibility with all of our programs to still have some room to increase budget if demand ends up being high. 1169 02:11:18,000 --> 02:11:39,000 In terms of budget projections that's in the works right now but from a high level where we stand through year end the two million for battery rebate program we wouldn't currently be looking to go back for board approval in terms of that overall budget amount and then in terms of additional I think we'd have to see where it goes from there I don't have a. 1170 02:11:39,000 --> 02:11:54,000 I don't have a big picture on the budget and I think that's what that is really important for you and the two million we were looking at in terms of projection and that should fit within our existing energy programs budget and then yes and as time goes on we'd keep evaluating that on a monthly basis and see how it. 1171 02:11:54,000 --> 02:12:02,000 And the big picture on our budget, does it still look like we have a fair amount of excess funds? 1172 02:12:02,000 --> 02:12:04,000 I mean, maybe that's the wrong term. 1173 02:12:04,000 --> 02:12:09,000 The funds that we may not spend during the year depending on how the project uptake is. 1174 02:12:09,000 --> 02:12:14,000 I mean, is your best estimate that there might be some extra funds at this point in time? 1175 02:12:14,000 --> 02:12:23,000 Well, I'm hesitant to give a response set just because we're doing a lot right now to train increased project impact. 1176 02:12:23,000 --> 02:12:27,000 Like we expanded scope of plan year fleet. 1177 02:12:27,000 --> 02:12:31,000 We're looking at various outreach methods of different programs. 1178 02:12:31,000 --> 02:12:36,000 But we are certainly with that two million for the battered rebate programs saying that aside. 1179 02:12:36,000 --> 02:12:39,000 And there is a chance there could be extra available. 1180 02:12:39,000 --> 02:12:42,000 And that's part of the evaluation that we'd be doing. 1181 02:12:42,000 --> 02:12:43,000 Okay. 1182 02:12:43,000 --> 02:12:45,000 Well, thank you. 1183 02:12:45,000 --> 02:12:49,000 Do we have any public comment on this item? 1184 02:12:49,000 --> 02:12:52,000 No, public comment, sure. 1185 02:12:52,000 --> 02:12:53,000 All right. 1186 02:12:53,000 --> 02:12:55,000 Well, we have a motion in a second on the floor. 1187 02:12:55,000 --> 02:12:58,000 Can we have a roll call vote, please? 1188 02:12:58,000 --> 02:12:59,000 Thank you, sure. 1189 02:12:59,000 --> 02:13:00,000 Alan. 1190 02:13:02,000 --> 02:13:03,000 Okay. 1191 02:13:03,000 --> 02:13:04,000 Alan. 1192 02:13:04,000 --> 02:13:05,000 Sir. 1193 02:13:05,000 --> 02:13:06,000 Alan. 1194 02:13:06,000 --> 02:13:07,000 Alan. 1195 02:13:07,000 --> 02:13:08,000 All right. 1196 02:13:08,000 --> 02:13:09,000 Alan. 1197 02:13:09,000 --> 02:13:10,000 I. 1198 02:13:10,000 --> 02:13:11,000 Dan was? 1199 02:13:11,000 --> 02:13:12,000 No. 1200 02:13:12,000 --> 02:13:13,000 I. 1201 02:13:13,000 --> 02:13:14,000 Jesus. 1202 02:13:14,000 --> 02:13:15,000 I'm sorry. 1203 02:13:15,000 --> 02:13:16,000 Johnson. 1204 02:13:16,000 --> 02:13:18,000 I. 1205 02:13:18,000 --> 02:13:20,000 McCreish. 1206 02:13:20,000 --> 02:13:21,000 I. 1207 02:13:21,000 --> 02:13:22,000 No. 1208 02:13:22,000 --> 02:13:23,000 I. 1209 02:13:23,000 --> 02:13:24,000 Sarah. 1210 02:13:24,000 --> 02:13:25,000 I. 1211 02:13:25,000 --> 02:13:26,000 Stadman. 1212 02:13:26,000 --> 02:13:27,000 Hi. 1213 02:13:27,000 --> 02:13:28,000 Two to go. 1214 02:13:28,000 --> 02:13:29,000 Hi. 1215 02:13:29,000 --> 02:13:31,000 Vice chair Davis. 1216 02:13:31,000 --> 02:13:33,000 I. 1217 02:13:33,000 --> 02:13:34,000 Chair Keeper. 1218 02:13:34,000 --> 02:13:35,000 Hi. 1219 02:13:35,000 --> 02:13:36,000 Aye. 1220 02:13:36,000 --> 02:13:37,000 Chair Keeper. 1221 02:13:37,000 --> 02:13:38,000 Aye. 1222 02:13:38,000 --> 02:13:39,000 Okay. 1223 02:13:39,000 --> 02:13:44,000 So the motion is passed. 1224 02:13:44,000 --> 02:13:48,000 And would this be a good time for us to take a break? 1225 02:13:49,000 --> 02:13:52,000 I think it would be a good time for us to take a break. 1226 02:13:52,000 --> 02:13:59,000 So we will be back at 635. 1227 02:13:59,000 --> 02:14:02,000 Thank you. 1228 02:14:02,000 --> 02:14:03,000 Yes. 1229 02:14:18,000 --> 02:14:20,000 Thank you. 1230 02:14:48,000 --> 02:14:50,000 Thank you. 1231 02:17:00,000 --> 02:17:10,000 We're going to call our meeting back to order. Clerk, file, could you check for quorum, do I will call? 1232 02:17:10,000 --> 02:17:12,000 Yes, chair. 1233 02:17:12,000 --> 02:17:14,000 Aaron. 1234 02:17:14,000 --> 02:17:16,000 Here. 1235 02:17:16,000 --> 02:17:18,000 Bellman. 1236 02:17:18,000 --> 02:17:19,000 Present. 1237 02:17:19,000 --> 02:17:20,000 Byron. 1238 02:17:20,000 --> 02:17:22,000 Back for more. 1239 02:17:22,000 --> 02:17:24,000 Yes, more. 1240 02:17:24,000 --> 02:17:25,000 Here. 1241 02:17:25,000 --> 02:17:26,000 Johnson. 1242 02:17:26,000 --> 02:17:27,000 Here. 1243 02:17:27,000 --> 02:17:29,000 Niklash. 1244 02:17:29,000 --> 02:17:30,000 Here. 1245 02:17:30,000 --> 02:17:31,000 Morton. 1246 02:17:31,000 --> 02:17:32,000 Here. 1247 02:17:32,000 --> 02:17:33,000 So, though. 1248 02:17:33,000 --> 02:17:34,000 Here. 1249 02:17:34,000 --> 02:17:35,000 Steadman. 1250 02:17:35,000 --> 02:17:36,000 Here. 1251 02:17:36,000 --> 02:17:37,000 Toodoki. 1252 02:17:37,000 --> 02:17:38,000 Here. 1253 02:17:40,000 --> 02:17:52,000 Vice chair Davis. 1254 02:17:52,000 --> 02:17:54,000 I think she had to take off. 1255 02:17:54,000 --> 02:17:56,000 Thank you, and I'm chair Kaper. 1256 02:17:56,000 --> 02:17:57,000 Here. 1257 02:17:57,000 --> 02:17:58,000 You're here. 1258 02:17:58,000 --> 02:17:59,000 I have a call. 1259 02:17:59,000 --> 02:18:01,000 Thank you very much. 1260 02:18:01,000 --> 02:18:09,000 Our next item is to provide input and provide staff, a support, staff's action plan to implement the 1261 02:18:09,000 --> 02:18:13,000 UNServed communities outreach and engagement action plan. 1262 02:18:13,000 --> 02:18:17,000 So, I think this is a follow-up to the actual document itself. 1263 02:18:17,000 --> 02:18:21,000 How it's going to be implemented. 1264 02:18:21,000 --> 02:18:22,000 Yes. 1265 02:18:22,000 --> 02:18:24,000 Thank you, chair. 1266 02:18:24,000 --> 02:18:25,000 You'll be call. 1267 02:18:25,000 --> 02:18:28,000 We presented to you earlier this year. 1268 02:18:28,000 --> 02:18:35,000 The CAC had been instrumental in the development of our underserved communities outreach and engagement plan. 1269 02:18:35,000 --> 02:18:40,000 We've since decided to add an action plan element to that plan. 1270 02:18:40,000 --> 02:18:45,000 So, we really are looking at measurable outcomes and actions. 1271 02:18:45,000 --> 02:18:52,000 We presented at one of your meetings earlier this year that we were embarking on this initiative. 1272 02:18:52,000 --> 02:18:57,000 Saw your input on what items could be included in that action plan. 1273 02:18:57,000 --> 02:19:03,000 And we're now at the point where we have taken that input and created the action plan. 1274 02:19:03,000 --> 02:19:15,000 So, your input into this process has been invaluable and we're very much looking forward to receiving your feedback on this initiative. 1275 02:19:15,000 --> 02:19:19,000 And with that, I will turn things over to Jenna Espinoza. 1276 02:19:19,000 --> 02:19:24,000 She's our Manager of Customer Account Services and she will present this item. 1277 02:19:24,000 --> 02:19:26,000 Thank you. 1278 02:19:26,000 --> 02:19:27,000 Thank you. 1279 02:19:27,000 --> 02:19:28,000 Good evening. 1280 02:19:28,000 --> 02:19:30,000 Community Advisory Council. 1281 02:19:30,000 --> 02:19:32,000 Thank you for the opportunity to present to you. 1282 02:19:32,000 --> 02:19:41,000 I just want to note that in addition to leading our community engagement and customer services teams. 1283 02:19:41,000 --> 02:19:49,000 I am also accompanied by my colleague Fernando O'Connor who's in the audience in the main room tonight. 1284 02:19:49,000 --> 02:19:55,000 And as a member of my team, she leads our bilingual community engagement efforts. 1285 02:19:59,000 --> 02:20:11,000 This evening I will be sharing an update on the work that has been conducted to review and prioritize outreach strategies in furtherance of the underserved communities outreach and engagement plan. 1286 02:20:11,000 --> 02:20:20,000 And I subsequent development of an action plan which is intended to guide staffs activities throughout the next fiscal year. 1287 02:20:20,000 --> 02:20:25,000 In the instance that you are not already familiar with the underserved communities outreach and engagement plan. 1288 02:20:25,000 --> 02:20:33,000 I want to share a brief background on the plan and revisit our definition of underserved communities. 1289 02:20:33,000 --> 02:20:48,000 The underserved communities outreach and engagement plan was developed by 3CE staff and an ad hoc committee of the community advisory committee in 2021 and accepted by the policy board in 2022. 1290 02:20:49,000 --> 02:21:04,000 In April this year, we are not done. I brought to an update on the agency's progress in the plan and presented a preliminary action plan to prioritize staffs work in the Serena for the next fiscal year. 1291 02:21:04,000 --> 02:21:11,000 3CE considers communities to be underserved if they are underrepresented in matters discussed by the agency. 1292 02:21:11,000 --> 02:21:19,000 And as an access to public investments resources, education and information about energy service is limited. 1293 02:21:19,000 --> 02:21:38,000 As a role, communities face greater barriers to access because of their geographic location, cultural or language differences socioeconomic status, health risks, their position within the digital divide and exposure to environmental hazards. 1294 02:21:38,000 --> 02:21:48,000 While we are always actively building relationships and meeting with key community partners, we want to hold focused meetings specifically for the purpose of conducting and 1295 02:21:48,000 --> 02:21:55,000 informal rapid needs assessments, specifically focused on underserved communities. 1296 02:21:55,000 --> 02:22:03,000 To do this, we met internally across departments with a handful of current and past members of the community advisory council. 1297 02:22:03,000 --> 02:22:11,000 10 community-based organizations across our service area and four public electricity providers across the state. 1298 02:22:12,000 --> 02:22:21,000 In our internal meetings, we identified lessons learned since development of plan and current barriers to more equitably serving our customers. 1299 02:22:21,000 --> 02:22:29,000 And we met with current and past members of the community advisory council who were involved in the development of the original plan. 1300 02:22:30,000 --> 02:22:40,000 Now, while there are thousands of community-based organizations in our service area for the purpose of prioritizing our work under this plan for the next fiscal year, 1301 02:22:40,000 --> 02:22:49,000 we met with community-based organizations that provide direct services to those community members in our service area for the most economically vulnerable. 1302 02:22:49,000 --> 02:22:57,000 Through these conversations, we learned that while many of the agencies have the ability to serve customers in English and Spanish, 1303 02:22:57,000 --> 02:23:05,000 translating into indigenous languages even for the purpose of supporting their most basic of needs is very challenging. 1304 02:23:05,000 --> 02:23:16,000 This emphasized even further how important it is for us to simplify our communications in both English and Spanish to make it as easy as possible to share our message. 1305 02:23:17,000 --> 02:23:24,000 One of these organizations was focused in particular on culturally and linguistically appropriate marketing and outreach, 1306 02:23:24,000 --> 02:23:32,000 and this conversation highlighted ways that we could reduce barriers to participation in our programs through new outreach strategies. 1307 02:23:32,000 --> 02:23:38,000 These conversations also centered around the cost of living with housing being the most challenging. 1308 02:23:38,000 --> 02:23:47,000 Most of the agencies we spoke to provide direct bill pay assistance, but there was varying consistency across these agencies in them going, 1309 02:23:47,000 --> 02:23:57,000 and referring customers to care for a worldwide heap and we see a great opportunity to improve in this arena. 1310 02:23:58,000 --> 02:24:08,000 We also met with the community foundation in each county to get a regional view of the needs facing our community and the organizations doing work that is most relevant to our agency. 1311 02:24:08,000 --> 02:24:21,000 These conversations were focused on identifying potential partners with whom we could build stronger relationships to advance awareness of care fair and other bill pay assistance programs. 1312 02:24:21,000 --> 02:24:46,000 I lost my third programs that reach winners, reduced barriers, and increased the impact of energy programs on underserved communities through direct install pilots and building workforce development pathways. 1313 02:24:46,000 --> 02:25:02,000 Additionally, we met with four other public electricity providers such as ourselves to discuss best practices in energy equity through the maintaining relationships with community-based organizations and energy program design. 1314 02:25:02,000 --> 02:25:09,000 These key findings have been developed into an action plan for fiscal year 2024 25. 1315 02:25:09,000 --> 02:25:27,000 The action plan follows the format of the underserved communities outreach and engagement plan, and therefore has been organized into four key goals on the screen. 1316 02:25:27,000 --> 02:25:42,000 To increase awareness about customer financial resources, we aim to establish relationships with one social service agency and each county to build awareness among community-based organizations regarding our competitive rates, 1317 02:25:42,000 --> 02:25:55,000 develop bilingual resources, new call center scripts, and continue to host our farmwork or outreach program. 1318 02:25:55,000 --> 02:26:10,000 To increase awareness and access to energy programs, we intend to create an inquiry process to help specific customers complete their energy program applications and use this as an opportunity to identify ways to improve the application process. 1319 02:26:10,000 --> 02:26:17,000 We're also partnering with at least two community-based organizations to advance applications. 1320 02:26:17,000 --> 02:26:25,000 We will also explore the pilot of a direct install program for heat pumps. 1321 02:26:25,000 --> 02:26:39,000 To collect customer feedback, we will host focus groups, explore opportunities to support career pathways, and continue to incorporate Spanish language outreach into our annual customer survey. 1322 02:26:39,000 --> 02:27:05,000 Finally, we will launch a re-enrollant and customer awareness outreach campaign that will include a focus on caring for customers, social media, developing a process to adjust our materials so that they're easier to read and connect better with Spanish-speaking customers, their Spanish media, and by featuring Spanish speakers in our promotional campaigns. 1323 02:27:05,000 --> 02:27:15,000 So I mentioned knowledge that measuring the success of engagement in underserved communities is a challenge that 3CE and other agencies are still working on. 1324 02:27:15,000 --> 02:27:21,000 CS and members ask that we build a set of measures for this action plan in order to track benchmarks. 1325 02:27:22,000 --> 02:27:39,000 The measurable items that were included in the plan are to finalize relationships and partner with one social service agency in each county in order to share 3CE's information regarding bill assistance rates, cost-saving tactics, and general awareness. 1326 02:27:39,000 --> 02:27:47,000 To host 16 pharmacist outreach events to distribute information on care, care, and 3CE programs. 1327 02:27:47,000 --> 02:28:00,000 To develop one screen share instruction and video on how to complete an energy program's application based on common barriers identified through the program inquiry process. 1328 02:28:00,000 --> 02:28:04,000 The partner was at least two community-based organizations. 1329 02:28:04,000 --> 02:28:07,000 One, if you could go back one slide. 1330 02:28:07,000 --> 02:28:18,000 Thank you. One in each, the Northern and Southern parts of our region to facilitate increased program referrals and energy program application assistance. 1331 02:28:18,000 --> 02:28:27,000 On a quarterly basis, review and address customer feedback and barriers identified during the energy programs inquiry process. 1332 02:28:27,000 --> 02:28:34,000 To continue to incorporate Spanish language outreach as part of our annual customer survey. 1333 02:28:34,000 --> 02:28:45,000 To develop a process of using infographics and narratives to align development of new and updated materials with the community's literacy levels. 1334 02:28:45,000 --> 02:28:53,000 And to feature Spanish speaking customers and community members in two paid promotional campaigns. 1335 02:28:54,000 --> 02:29:10,000 So, in conclusion, I want to acknowledge the time that dozens of people took to meet with us to help us think creatively to identify barriers and solutions and identify ways that we can show them community better and more successfully. 1336 02:29:10,000 --> 02:29:20,000 And for not in particular, did the heavy lifting to organize these meetings and put thought into how those meetings could be most successful. 1337 02:29:20,000 --> 02:29:28,000 And she was very thoughtful and expressing her gratitude to each and every individual who sat down with us. 1338 02:29:28,000 --> 02:29:39,000 So with that, the full action plan is in your pocket and after we receive your feedback today, we'll be bringing this action plan to the policy board during their June 26 meeting. 1339 02:29:39,000 --> 02:29:45,000 So thank you for your time and attention this evening and I'm happy to answer any questions. 1340 02:29:45,000 --> 02:29:47,000 Thank you very much. 1341 02:29:47,000 --> 02:29:51,000 Do we have questions or comments from the council? 1342 02:29:53,000 --> 02:29:56,000 Council member Johnson. 1343 02:29:56,000 --> 02:29:57,000 Thank you. 1344 02:29:57,000 --> 02:30:00,000 So at some point, I'm imagining. 1345 02:30:00,000 --> 02:30:07,000 As you're deploying this plan, you'll be feeding back and evaluating an update on the plan, how 1346 02:30:07,000 --> 02:30:12,200 it's going, how you're hitting your metrics, so forth and so if that's a question, I assume 1347 02:30:12,200 --> 02:30:16,840 that you're going to be doing that and you'll be bringing that back to the CAC episodically 1348 02:30:16,840 --> 02:30:20,240 to let us know how it's going. I hope. 1349 02:30:20,240 --> 02:30:26,680 Yes, so this is a action plan for the next fiscal year, so I would imagine that we would give 1350 02:30:26,680 --> 02:30:33,680 an update perhaps mid year, but we haven't determined exact cadence of feedback. 1351 02:30:33,680 --> 02:30:39,680 That seems right, thank you. 1352 02:30:39,680 --> 02:30:48,680 I'm not seeing comments from other council members. I had one question. I know that there's 1353 02:30:48,680 --> 02:30:53,680 some specific measures that we've taken in the past that are planning the future for 1354 02:30:53,680 --> 02:31:00,680 reaching out to farm workers, which are you really, are artists to reach customers. 1355 02:31:00,680 --> 02:31:09,680 I wonder if you have any other strategies for trying to connect with other low-income groups, 1356 02:31:09,680 --> 02:31:14,680 besides farm workers, groups or individuals who aren't farm workers? 1357 02:31:14,680 --> 02:31:22,680 Yes, so this next fiscal year, we will really be focusing on formalizing a few key relationships 1358 02:31:22,680 --> 02:31:29,680 with community-based organizations in hopes that those organizations that are already doing 1359 02:31:29,680 --> 02:31:40,680 direct service or grassroots-based work will be able to better connect with those community members. 1360 02:31:40,680 --> 02:31:48,680 I think that's great. We're making further connections with our community-based organizations. 1361 02:31:48,680 --> 02:31:57,680 I think there are a resource that we should continue to develop relationships with 1362 02:31:57,680 --> 02:31:59,680 Congress Mayor Soto. 1363 02:31:59,680 --> 02:32:01,680 I just got promoted. 1364 02:32:01,680 --> 02:32:04,680 I just got promoted. 1365 02:32:04,680 --> 02:32:12,680 I have, well first, I do want to commend the hard work that went into developing this action plan. 1366 02:32:12,680 --> 02:32:16,680 And thank you for the presentation. I thought it was very thorough. 1367 02:32:16,680 --> 02:32:21,680 And what impressed me the most is how community-centered your strategies are. 1368 02:32:21,680 --> 02:32:24,680 But I think that's valuable. It's very important. 1369 02:32:24,680 --> 02:32:30,680 It's key. There was a couple of points that were mentioned that kind of stuck out at me and 1370 02:32:30,680 --> 02:32:38,680 identifying who those trusted messengers are in the communities to be able to further expand the conversation 1371 02:32:38,680 --> 02:32:43,680 on this and not just from a community education perspective, but even just breaking it down 1372 02:32:43,680 --> 02:32:52,680 to what are the benefits and what are the messages that align most with the core values of the communities you're trying to reach. 1373 02:32:52,680 --> 02:32:57,680 And I often boast and say that Mexicans invented reuse recycle. 1374 02:32:57,680 --> 02:33:02,680 And because nothing is wasted in our homes and it's just part of our culture. 1375 02:33:02,680 --> 02:33:10,680 Part of our values, we don't waste. I don't go and buy garbage bags. 1376 02:33:10,680 --> 02:33:15,680 That's just one very minor example. 1377 02:33:15,680 --> 02:33:27,680 But taking care of and being good stewards of the earth is very important to many indigenous members of our community 1378 02:33:27,680 --> 02:33:32,680 and most especially in the culture that I represent as well. 1379 02:33:32,680 --> 02:33:39,680 It's very important to us. So being able to come from that message point will be very well received 1380 02:33:39,680 --> 02:33:45,680 and it will resonate with most of the community members that you're trying to reach and what is considered the heart to reach 1381 02:33:45,680 --> 02:33:51,680 or the underserved and under-resourced historically marginalized communities. I think that's really important. 1382 02:33:51,680 --> 02:34:01,680 I also wanted to state that I, the building the relationships across sectors is very valuable in reaching the communities 1383 02:34:01,680 --> 02:34:06,680 and particularly in media as well when you have strong relationships with media. 1384 02:34:06,680 --> 02:34:17,680 Not only will they give you more for your book, but they'll also definitely help continue to spread the word and have conversations around that. 1385 02:34:17,680 --> 02:34:32,680 One particular radio station in the Latino communities, Spanish speaking community, radio is usually the most the biggest form of media that we rely on and get our information from 1386 02:34:32,680 --> 02:34:37,680 because we take radios everywhere. They're in the fields if you were in the hospitality industry. 1387 02:34:37,680 --> 02:34:42,680 It's what's playing in the background and the kitchens and the restaurants that's what's playing in the background. 1388 02:34:42,680 --> 02:34:51,680 So having deep and strong relationships with media is going to have a big impact in the work that you're doing with this action plan. 1389 02:34:51,680 --> 02:35:05,680 One particular station, not just because it's my favorite and I used to be a volunteer DJ, radio, radio, they have several talk shows throughout the week. 1390 02:35:05,680 --> 02:35:12,680 And really that's another strategy I would recommend you consider is working with them so that they could break down. 1391 02:35:12,680 --> 02:35:18,680 I mean, you could probably have a show every month just to break down a lot of the work that we're doing here. 1392 02:35:18,680 --> 02:35:26,680 So that you can kind of focus on different things and compartmentalize, you know, big part of what you want to do before you operationalize is normalized, right? 1393 02:35:26,680 --> 02:35:40,680 So really bringing this conversation to community in a very unique way that is not just not just comprehensive but also relational and that aligns with core values. 1394 02:35:40,680 --> 02:35:44,680 I think you're going to go a long way when when you approach it in that manner. 1395 02:35:44,680 --> 02:35:46,680 So those are my comments. Thank you very much. 1396 02:35:46,680 --> 02:35:50,680 Thank you for the hard work. Thank you, Rosemary. 1397 02:35:50,680 --> 02:35:53,680 Councilmember Norton. 1398 02:35:53,680 --> 02:36:01,680 Yeah, I also want to commend the hard work that you're doing and just to sort of support what Councilmember Soto just said. 1399 02:36:01,680 --> 02:36:07,680 I think radio by I think my friend Jose Martinez saw Donna just became colleague executive director of that. 1400 02:36:07,680 --> 02:36:11,680 So I think that's a great resource and she shouldn't pass it up. 1401 02:36:11,680 --> 02:36:22,680 And the other just piece of advice that I didn't see it here, but maybe it's in the CBOs that you're hiring, but also to work, especially in San不了 County. 1402 02:36:22,680 --> 02:36:27,680 I think work with the communities of faith. 1403 02:36:27,680 --> 02:36:38,680 I think especially in San不了 County, there's a lot of folks that are attending church on city mornings that aren't outside of the normal places of contact. 1404 02:36:38,680 --> 02:36:48,680 And so I think that maybe an effort is probably true of other places, but I know in San不了 County that that's a place you don't want to mess in order to reach I think the target audience. 1405 02:36:48,680 --> 02:36:51,680 Thank you. 1406 02:36:51,680 --> 02:36:55,680 Thank you. 1407 02:36:55,680 --> 02:37:06,680 Yeah, I just I wanted to say one of the reasons I've proud to have been involved with the organization is because of the priority we placed on reaching out to underserved communities. 1408 02:37:06,680 --> 02:37:11,680 And the resources we put to that and the great staff work that you guys have been doing. 1409 02:37:11,680 --> 02:37:14,680 So appreciate that. 1410 02:37:14,680 --> 02:37:19,680 This item is I believe an action item for us to make a recommendation to the policy board. 1411 02:37:19,680 --> 02:37:26,680 So I would entertain a motion on that. 1412 02:37:26,680 --> 02:37:29,680 Second. 1413 02:37:29,680 --> 02:37:33,680 Do we have any further discussion on the motion? 1414 02:37:33,680 --> 02:37:36,680 Chair, we do need to call for public comments. 1415 02:37:36,680 --> 02:37:37,680 That's an excellent idea. 1416 02:37:37,680 --> 02:37:41,680 Thank you. 1417 02:37:41,680 --> 02:37:43,680 It doesn't look like we have any public comments. 1418 02:37:43,680 --> 02:37:47,680 And I guess the motion and the second. 1419 02:37:47,680 --> 02:37:51,680 Thank you. 1420 02:37:51,680 --> 02:37:53,680 Norton, Norton made the motion. 1421 02:37:53,680 --> 02:37:55,680 Statement second. 1422 02:37:55,680 --> 02:37:59,680 Thank you. 1423 02:37:59,680 --> 02:38:02,680 Could you please call a roll call vote? 1424 02:38:02,680 --> 02:38:03,680 Yes. 1425 02:38:03,680 --> 02:38:04,680 Chair. 1426 02:38:04,680 --> 02:38:05,680 Alan. 1427 02:38:05,680 --> 02:38:06,680 I. 1428 02:38:06,680 --> 02:38:09,680 Dr. Domain. 1429 02:38:09,680 --> 02:38:11,680 All right. 1430 02:38:11,680 --> 02:38:12,680 All right. 1431 02:38:12,680 --> 02:38:13,680 Five in. 1432 02:38:13,680 --> 02:38:14,680 Aye. 1433 02:38:14,680 --> 02:38:15,680 Timers. 1434 02:38:15,680 --> 02:38:17,680 Aye. 1435 02:38:17,680 --> 02:38:18,680 Johnson. 1436 02:38:18,680 --> 02:38:19,680 Yes. 1437 02:38:19,680 --> 02:38:21,680 Thanks. 1438 02:38:21,680 --> 02:38:23,680 Nick Wish. 1439 02:38:23,680 --> 02:38:26,680 Aye. 1440 02:38:26,680 --> 02:38:28,680 Norton. 1441 02:38:28,680 --> 02:38:30,680 Aye. 1442 02:38:31,680 --> 02:38:32,680 So, though. 1443 02:38:32,680 --> 02:38:34,680 Aye. 1444 02:38:34,680 --> 02:38:35,680 Statement. 1445 02:38:35,680 --> 02:38:36,680 Yes. 1446 02:38:36,680 --> 02:38:38,680 To it to Boogie. 1447 02:38:38,680 --> 02:38:40,680 Aye. 1448 02:38:40,680 --> 02:38:41,680 Chair. 1449 02:38:41,680 --> 02:38:42,680 Aye. 1450 02:38:42,680 --> 02:38:45,680 Motion is carry. 1451 02:38:45,680 --> 02:38:50,680 Our next item is to receive a report from our nominations committee. 1452 02:38:50,680 --> 02:38:59,680 And before I turn that silver to Wayne Norton, who's going to bring that to us, I just wanted to say. 1453 02:39:00,680 --> 02:39:01,680 What a pleasure. 1454 02:39:01,680 --> 02:39:06,680 It's been sharing this council for the last two years and serving on it for the last six years. 1455 02:39:06,680 --> 02:39:12,680 It's an amazing organization to have been part of the growth, if a nominal growth. 1456 02:39:12,680 --> 02:39:21,680 And just to see us from our early beginnings get up to the high level of professional work that's being done now. 1457 02:39:21,680 --> 02:39:24,680 I really enjoyed working with the staff. 1458 02:39:24,680 --> 02:39:27,680 I'm happy to see new staff coming on board today. 1459 02:39:27,680 --> 02:39:33,680 Especially enjoyed working the last two years with Catherine and Rob who I've been working closely with. 1460 02:39:33,680 --> 02:39:39,680 And I think that I've served with 26 members on this council over the last six years. 1461 02:39:39,680 --> 02:39:47,680 And, you know, the thing I've been impressed with is I don't think people have come to this this room with their own agendas. 1462 02:39:47,680 --> 02:39:54,680 Even though some of us were put on on the council because of the particular interest we had previously. 1463 02:39:54,680 --> 02:40:03,680 I think universally people have come here because they were committed to the big picture work that we're trying to do in terms of climate. 1464 02:40:03,680 --> 02:40:14,680 And we've just had a number of terrific council members that's been really a pleasure serving with all of you. 1465 02:40:14,680 --> 02:40:18,680 So council number. 1466 02:40:18,680 --> 02:40:20,680 Yeah, thank you. 1467 02:40:20,680 --> 02:40:24,680 And first of all, I just went before we pick us success. 1468 02:40:24,680 --> 02:40:35,680 I just want to say thanks to Seth, you know, Seth that I've worked together on a numerous projects over the 30 or 35 years that we've known each other. 1469 02:40:35,680 --> 02:40:37,680 And Seth has always had. 1470 02:40:37,680 --> 02:40:44,680 Seth has always had the community and heart and in front of mind and broader community. 1471 02:40:44,680 --> 02:40:52,680 And when it comes to the three CE remember, Seth has been with this organization before it became an organization. 1472 02:40:52,680 --> 02:41:02,680 Seth was one of the grassroots people who worked hard to build the public support for this for this organization to exist. 1473 02:41:02,680 --> 02:41:11,680 So, you know, Seth's been here since before the beginning and I know that he will not this won't be the last time while he was voice. 1474 02:41:11,680 --> 02:41:19,680 I'm sure that when Janie calls for public comment, I'm sure that someday Seth is going to be the guy out there and the security attention. 1475 02:41:19,680 --> 02:41:22,680 So anyway, thank you, Seth, appreciate all of you that. 1476 02:41:22,680 --> 02:41:23,680 So thank you. 1477 02:41:23,680 --> 02:41:25,680 Just start when you yield for a moment. 1478 02:41:25,680 --> 02:41:26,680 Yeah, please. 1479 02:41:26,680 --> 02:41:27,680 Just chairman. 1480 02:41:27,680 --> 02:41:30,680 I, I too am stepping down. 1481 02:41:30,680 --> 02:41:34,680 And I'd like to also express my appreciation for your leadership these last two years. 1482 02:41:34,680 --> 02:41:40,680 And as Mr. Norton said, all the years prior certainly to before I got here six years ago as well. 1483 02:41:40,680 --> 02:41:47,680 So well done, but may I may I make just a few closing remarks also and unless you prefer I go later. 1484 02:41:47,680 --> 02:41:50,680 Okay, I just want to say a couple of things as well. 1485 02:41:50,680 --> 02:41:56,680 I really appreciate this this council as does as does the chair. 1486 02:41:56,680 --> 02:41:59,680 I appreciate all of you as volunteers. 1487 02:41:59,680 --> 02:42:05,680 I don't think you get enough recognition for serving your community. 1488 02:42:06,680 --> 02:42:10,680 A statement is nice, but it's not the same as saying thank you. 1489 02:42:10,680 --> 02:42:12,680 And I don't think you hear it often enough. 1490 02:42:12,680 --> 02:42:16,680 So I'd like to put my thank you in for your service as well. 1491 02:42:16,680 --> 02:42:20,680 Of course, it's self serving because I'm in the same capacity I suppose. 1492 02:42:20,680 --> 02:42:27,680 But I do want to say two other things and it's just a little bit of perspective and hopefully encouraging. 1493 02:42:27,680 --> 02:42:34,680 CCAs are the, are the the best thing that was created in the electric power industry in my career in California. 1494 02:42:34,680 --> 02:42:40,680 You know, we'd like to take credit for a lot of good things, you know, renewables and energy storage. 1495 02:42:40,680 --> 02:42:45,680 But CCAs are a really good thing. 1496 02:42:45,680 --> 02:42:56,680 And, you know, California is a leader in really throughout the world but certainly in the United States on environmental and energy issues. 1497 02:42:56,680 --> 02:43:03,680 And, and I have to say this vertically integrated regulated monopolies are antiquated structures. 1498 02:43:03,680 --> 02:43:09,680 We don't need them anymore, except for the wires, let them run the wires. 1499 02:43:09,680 --> 02:43:15,680 CCAs are the unrealized promise of deregulation that goes back to the 90s. 1500 02:43:15,680 --> 02:43:23,680 It really, it really is a powerful thing and I think some of some of us recognize that early on. 1501 02:43:23,680 --> 02:43:33,680 And, and, and I don't think we realize that are, we need to be reminded often that the full power of the promise of CCAs and what we have beneath our feed here. 1502 02:43:33,680 --> 02:43:36,680 We need to exercise it serve our customers. 1503 02:43:36,680 --> 02:43:39,680 We can serve customers without regulators. 1504 02:43:39,680 --> 02:43:52,680 Nobody else gets to do that without shareholders and without what I would characterize as the, the warp measures of the regulatory rate making process in San Francisco. 1505 02:43:52,680 --> 02:43:54,680 We don't do that. 1506 02:43:54,680 --> 02:44:03,680 And, and, so we need to continue that as an advisory council, help our elected officials put that power to work. 1507 02:44:03,680 --> 02:44:08,680 I'd also like to just say a little bit about 3 CE. 1508 02:44:08,680 --> 02:44:13,680 I've been promoting CCAs around the state for a long time. 1509 02:44:13,680 --> 02:44:16,680 I think this is amongst the best. 1510 02:44:16,680 --> 02:44:20,680 It's, it's got the best. 1511 02:44:20,680 --> 02:44:24,680 Governance structure as difficult as it may be. 1512 02:44:24,680 --> 02:44:29,680 And, and I think we've got some of the best staff and leadership. 1513 02:44:29,680 --> 02:44:33,680 And, of course, the champions that brought this forward years ago. 1514 02:44:33,680 --> 02:44:37,680 Every, every CCA had a, had a champion of some kind. 1515 02:44:37,680 --> 02:44:47,680 And, and, Mr. Mr. McPherson, any standout for having seen this through. 1516 02:44:47,680 --> 02:44:52,680 So, I encourage you to ask yourselves before every meeting or during every meeting. 1517 02:44:52,680 --> 02:44:55,680 What is the best thing we can do for three CE customers? 1518 02:44:55,680 --> 02:44:59,680 And I'll end on, on a bit of a cautionary note. 1519 02:45:00,000 --> 02:45:05,000 There is a organization out there that lurks constantly. 1520 02:45:05,000 --> 02:45:14,000 I think I've talked enough about that organization today, but I just want to remind you, this is an enormous threat to their business practices. 1521 02:45:14,000 --> 02:45:22,000 And as much as we need to get along and work together, they ran a ballot initiative and spent $50 million to try and bury this. 1522 02:45:22,000 --> 02:45:25,000 They ran legislation to try and bury this. 1523 02:45:25,000 --> 02:45:33,000 They've put in roadblocks, right in left, departing load, procurement, charge, and different allegations, on and on and on. 1524 02:45:33,000 --> 02:45:36,000 And you've overcome all those barriers. 1525 02:45:36,000 --> 02:45:39,000 Interconnection may be the new one. 1526 02:45:39,000 --> 02:45:43,000 Mr. Dyson Neal is gone. 1527 02:45:43,000 --> 02:45:50,000 And remember, they can even go bankrupt and still emerge from the dead. 1528 02:45:50,000 --> 02:45:53,000 We do not get that option. 1529 02:45:53,000 --> 02:46:02,000 So be vigilant because I just really think, as as low as the risk may be, the consequences are severe. 1530 02:46:02,000 --> 02:46:11,000 So again, I, my best wishes to all you, to all, it's exciting time with new leadership. 1531 02:46:11,000 --> 02:46:14,000 So I wish our new leaders good luck as well. 1532 02:46:14,000 --> 02:46:17,000 But Seth, you're going to pleasure working with you. 1533 02:46:17,000 --> 02:46:19,000 See you in the future. 1534 02:46:19,000 --> 02:46:22,000 Thank you. 1535 02:46:22,000 --> 02:46:23,000 All right. 1536 02:46:23,000 --> 02:46:26,000 So just a little bit about the process. 1537 02:46:26,000 --> 02:46:28,000 By the way, Jeff, thanks a lot. 1538 02:46:28,000 --> 02:46:31,000 I've learned a lot from you over the course of the couple years I've been here. 1539 02:46:31,000 --> 02:46:32,000 Thank you. I appreciate it. 1540 02:46:32,000 --> 02:46:33,000 And thank you for your service. 1541 02:46:33,000 --> 02:46:35,000 So that a little bit about the process. 1542 02:46:35,000 --> 02:46:45,000 So in order to not violate the broad act, all the communication to the CAC members was done through the clerk. 1543 02:46:45,000 --> 02:46:50,000 We explored interest and position. 1544 02:46:50,000 --> 02:46:55,000 Anyone who just didn't say no right out was contacted. 1545 02:46:55,000 --> 02:47:00,000 So we could delve into it a little bit more. 1546 02:47:00,000 --> 02:47:04,000 And I also want to acknowledge the work of John Hughes, who's in here tonight. 1547 02:47:04,000 --> 02:47:07,000 But, I can't remember John Hughes was served with me on the ad hoc. 1548 02:47:07,000 --> 02:47:13,000 And in the end, we have two great leaders that are going to, I hope, 1549 02:47:14,000 --> 02:47:18,000 lead us well and wisely through the next couple years. 1550 02:47:18,000 --> 02:47:22,000 Council members, Jonathan, to have a two-key, so her ignored. 1551 02:47:22,000 --> 02:47:25,000 And I was practicing that in the car. 1552 02:47:25,000 --> 02:47:26,000 I'm sorry. 1553 02:47:26,000 --> 02:47:28,000 I messed that up. 1554 02:47:28,000 --> 02:47:33,000 But I'm happy with the process, the process worked well, I think. 1555 02:47:33,000 --> 02:47:41,000 And so, Seth, if you're ready chair, I will make an nomination to, 1556 02:47:41,000 --> 02:47:45,000 oh, you want to do it from four, how would you want to proceed with the nominations, 1557 02:47:45,000 --> 02:47:47,000 would you like me to make a nomination? 1558 02:47:47,000 --> 02:47:49,000 Nomination for chair first, yeah. 1559 02:47:49,000 --> 02:47:50,000 All right. 1560 02:47:50,000 --> 02:47:53,000 I nominate Jenny Johnson for chair. 1561 02:47:53,000 --> 02:47:56,000 Okay, that's the nomination brought to us by the nominating committee. 1562 02:47:56,000 --> 02:48:01,000 Does anybody else have any further nominations for chair? 1563 02:48:01,000 --> 02:48:08,000 Can I ask the clerk to bring that to a vote, please? 1564 02:48:08,000 --> 02:48:10,000 Thank you chair, Alan. 1565 02:48:10,000 --> 02:48:12,000 Bye. 1566 02:48:14,000 --> 02:48:16,000 Dr. Downham. 1567 02:48:16,000 --> 02:48:18,000 Gladly, I. 1568 02:48:18,000 --> 02:48:20,000 Violin? 1569 02:48:20,000 --> 02:48:22,000 Very gladly. I. 1570 02:48:22,000 --> 02:48:23,000 Do you want more? 1571 02:48:23,000 --> 02:48:25,000 Yes, for sure. 1572 02:48:25,000 --> 02:48:27,000 Johnson? 1573 02:48:27,000 --> 02:48:29,000 Yes. 1574 02:48:29,000 --> 02:48:32,000 McClish? 1575 02:48:32,000 --> 02:48:34,000 Aye. 1576 02:48:34,000 --> 02:48:36,000 Northern? 1577 02:48:36,000 --> 02:48:37,000 Aye. 1578 02:48:38,000 --> 02:48:42,000 Staten? 1579 02:48:42,000 --> 02:48:43,000 Yes. 1580 02:48:43,000 --> 02:48:45,000 Do you want to vote? 1581 02:48:45,000 --> 02:48:46,000 Yes. 1582 02:48:46,000 --> 02:48:48,000 Chair Capron. 1583 02:48:48,000 --> 02:48:50,000 Aye. 1584 02:48:52,000 --> 02:48:56,000 And for vice chair, I nominate Norman Tuva. 1585 02:48:56,000 --> 02:48:57,000 Tuke? 1586 02:48:57,000 --> 02:48:58,000 Tuke? 1587 02:48:58,000 --> 02:48:59,000 Tuke, Tuke? 1588 02:48:59,000 --> 02:49:01,000 Tuke, Tuke, Tuke? 1589 02:49:01,000 --> 02:49:02,000 Sorry. 1590 02:49:03,000 --> 02:49:05,000 Thank you. 1591 02:49:05,000 --> 02:49:10,000 And do we have any nominations from the floor for vice chair? 1592 02:49:10,000 --> 02:49:15,000 Seeing none, could the clerk please call the roll? 1593 02:49:15,000 --> 02:49:17,000 Alan? 1594 02:49:17,000 --> 02:49:18,000 Aye. 1595 02:49:18,000 --> 02:49:20,000 Dr. Downham? 1596 02:49:20,000 --> 02:49:22,000 Aye. 1597 02:49:22,000 --> 02:49:23,000 Violin? 1598 02:49:23,000 --> 02:49:24,000 Very much. 1599 02:49:24,000 --> 02:49:26,000 Aye. 1600 02:49:26,000 --> 02:49:27,000 Evers? 1601 02:49:27,000 --> 02:49:29,000 Yes. 1602 02:49:30,000 --> 02:49:31,000 Johnson? 1603 02:49:31,000 --> 02:49:33,000 Yes. 1604 02:49:33,000 --> 02:49:35,000 McClish? 1605 02:49:35,000 --> 02:49:37,000 Aye. 1606 02:49:37,000 --> 02:49:38,000 Northern? 1607 02:49:38,000 --> 02:49:39,000 Aye. 1608 02:49:39,000 --> 02:49:41,000 So, then? 1609 02:49:41,000 --> 02:49:43,000 Aye. 1610 02:49:43,000 --> 02:49:44,000 Zadman? 1611 02:49:44,000 --> 02:49:46,000 Yes. 1612 02:49:46,000 --> 02:49:47,000 Do you want to vote? 1613 02:49:47,000 --> 02:49:49,000 Yes. 1614 02:49:49,000 --> 02:49:50,000 Check it, Cran. 1615 02:49:50,000 --> 02:49:52,000 Aye. 1616 02:49:52,000 --> 02:49:53,000 The eyes have it. 1617 02:49:53,000 --> 02:49:57,000 Congratulations to our new chair and vice chair. 1618 02:49:57,000 --> 02:50:10,000 It feels great to be leaving this body and good hands and look forward to working 1619 02:50:10,000 --> 02:50:13,000 with you guys in the future. 1620 02:50:13,000 --> 02:50:16,000 Is this my last name? 1621 02:50:16,000 --> 02:50:17,000 Yes. 1622 02:50:17,000 --> 02:50:19,000 Well, yeah. 1623 02:50:19,000 --> 02:50:21,000 And I just want to thank both of you. 1624 02:50:21,000 --> 02:50:23,000 Thank you very much for your service. 1625 02:50:23,000 --> 02:50:25,000 It's been great working with you. 1626 02:50:25,000 --> 02:50:32,000 And I do remember, Seth Kaper and being at 11 o'clock in the evening, Hollister City Council meeting. 1627 02:50:32,000 --> 02:50:37,000 Hang in there with us and answering all the questions we finally got a good vote on that one. 1628 02:50:37,000 --> 02:50:39,000 That was very painful. 1629 02:50:39,000 --> 02:50:43,000 So, he was there and he suffered through it all. 1630 02:50:43,000 --> 02:50:48,000 Thank you so much for your service and for your time and for what you helped build here. 1631 02:50:48,000 --> 02:50:51,000 And thank you for the committee. 1632 02:50:51,000 --> 02:50:52,000 Thanks, Wayne. 1633 02:50:52,000 --> 02:50:53,000 I appreciate it. 1634 02:50:53,000 --> 02:50:54,000 Thank you. 1635 02:50:55,000 --> 02:51:04,000 Thank you both Seth and Jeff for your guidance and your leadership being new to the board. 1636 02:51:04,000 --> 02:51:11,000 Or to the council to understand all of the intricacies that go behind and what's involved in electricity itself. 1637 02:51:11,000 --> 02:51:12,000 And so I'm learning a lot. 1638 02:51:12,000 --> 02:51:17,000 And all of the questions you guys asked are asking our things that I don't think of. 1639 02:51:17,000 --> 02:51:19,000 And so I appreciate the opportunity to learn. 1640 02:51:19,000 --> 02:51:21,000 We talked a little bit about it earlier. 1641 02:51:21,000 --> 02:51:26,000 Before it to serve me folks supporting you folks as council members and also this agency. 1642 02:51:26,000 --> 02:51:29,000 I've been also supporting our new chair. 1643 02:51:29,000 --> 02:51:31,000 So appreciate the opportunity. 1644 02:51:31,000 --> 02:51:33,000 Well. 1645 02:51:33,000 --> 02:51:35,000 Thank you. 1646 02:51:35,000 --> 02:51:38,000 Thanks for your willingness to serve. 1647 02:51:38,000 --> 02:51:39,000 Yeah. 1648 02:51:39,000 --> 02:51:41,000 How are we? 1649 02:51:41,000 --> 02:51:44,000 We are adjourned. 1650 02:51:44,000 --> 02:51:48,000 Before we adjourn chair, we do just have one last. 1651 02:51:48,000 --> 02:51:53,000 As you were I done. 1652 02:51:53,000 --> 02:52:06,000 Which is that as has been noted, this is the last meeting for two very important and longstanding members of this council. 1653 02:52:06,000 --> 02:52:13,000 Seth, you and Jeff have been members of the community advisory council since 2018. 1654 02:52:13,000 --> 02:52:21,000 You have both served as chair and both added so much value to this organization. 1655 02:52:21,000 --> 02:52:26,000 Not just this committee, but our agency as a whole. 1656 02:52:26,000 --> 02:52:37,000 So on behalf of everyone at three CE or board the staff, we want to really thank you both for your meaningful contributions. 1657 02:52:37,000 --> 02:52:42,000 We wish you all the best in your future endeavors and hope that you stay in touch. 1658 02:52:42,000 --> 02:52:50,000 And I do just want to present to you a small token of our appreciation. 1659 02:52:50,000 --> 02:52:52,000 Thank you. 1660 02:52:52,000 --> 02:52:54,000 Thank you. 1661 02:52:54,000 --> 02:52:56,000 Thank you. 1662 02:52:56,000 --> 02:52:57,000 Thank you. 1663 02:52:57,000 --> 02:52:58,000 Thank you. 1664 02:52:58,000 --> 02:52:59,000 Thank you. 1665 02:52:59,000 --> 02:53:01,000 Just for the record. 1666 02:53:01,000 --> 02:53:03,000 I wanted to announce that we did not have any. 1667 02:53:03,000 --> 02:53:05,000 That would comment on that last title. 1668 02:53:35,000 --> 02:53:39,000 Thank you.