[0:00] a bunch of stuff like the [0:01] battery cage, pool lights, all this [0:03] stuff. [0:03] >> Then you can sell it and take pictures [0:05] and show it to people so they can [0:06] advertise. I That's a great deal, man. [0:08] >> up. It comes to my house and I was like, [0:10] "Well, now what? Who's coming to put [0:11] these in?" And he's like, [0:12] >> "Okay. We are ready to go. [0:16] So [0:17] Okay, we'll get the [0:19] May 12th, 2026 2026 DRC going today at [0:24] 10:00. [0:26] Um that we've got first item on the [0:28] agenda is a review of the proposed Taco [0:32] Bell building site plan [0:35] um that is proposed to go uh along 400 [0:38] East [0:39] um there at the the Macy's [0:42] uh next to the Macy's grocery store [0:45] north of the existing Fizz building just [0:48] in that parking lot area right off of I [0:50] should say parking lot area the gravel [0:53] area there just between [0:56] uh Macy's parking lot and 400 East. [0:58] Uh this is a again proposed site plan. [1:02] DRC is the final review and approval [1:04] body for the site plans. It is a [1:06] permitted use within the commercial [1:08] zone. [1:09] Um so with that, we'll go around the DRC [1:12] with any comments or questions that the [1:14] DRC members will have. So I'm with [1:16] Aspen. [1:18] >> Will you go to page four, please? [1:22] We just have some questions to clarify [1:25] or sorry, maybe one more. [1:27] Um for the parking requirements, our [1:30] code states that it's one space per four [1:32] seats. So if you could provide the [1:34] occupancy [1:36] so we can ensure that you meet our par- [1:38] parking code, that would be very [1:39] helpful. And then as far as landscaping, [1:43] you guys have the code listed on the [1:45] page and you call out the dumpster [1:48] needing three landscape sides. Um but [1:51] only two of the sides. That is a [1:53] requirement that [1:55] will need to be worked out. We will also [1:58] need to see the detail for the trash [2:01] enclosure to ensure that it matches the [2:03] building. [2:04] And then [2:06] with the architectural renderings that [2:09] will require a separate review by our [2:11] architectural review committee. [2:13] Um that can be set up anytime during the [2:16] process. So, just let us know when you'd [2:18] like to do that. And then with the sign [2:21] permits or all the signs, they'll need a [2:23] separate permit. You'll just do it [2:25] through citizen serve just like how you [2:27] applied for the site plan application. [2:30] Um [2:32] just as a heads-up. Will you go I don't [2:34] remember what page it's on. Maybe 11 or [2:36] 12. [2:38] The signs. [2:46] » And just so you know, these will be [2:48] given in red line format. So, you you're [2:50] more than welcome to take notes, but [2:51] we'll send you a red line copy. [2:53] >> Thank you. [2:53] >> So, that's available. [2:55] >> Appreciate that. [2:55] >> Uh-huh. [2:56] >> Yeah, I know. [2:59] » Um yeah, just a heads-up for the [3:01] monument sign. That pole will have to be [3:04] concealed in like a pedestal and [3:07] footing. [3:08] But, I think that's everything from [3:10] planning. [3:14] » Randy, building? [3:15] >> As far as the address assigned on there, [3:16] is that from the original plat of when [3:18] the [3:19] >> It would be, yes. Probably, yeah. [3:21] >> So, yeah. I think I'm good. I have [3:23] nothing for me at this point. [3:24] >> Okay. [3:26] Jason, with public works? [3:28] >> Yeah, I [3:30] stopped by the site as part of came up [3:32] here. [3:32] >> Turn your mic on, Jason. [3:34] >> Please. Sorry about that. Here we go. [3:36] >> I can hear you anyway. [3:38] >> Yeah, I I stopped by the site on the way [3:40] up and the irrigation meters that shown [3:42] on the property, the one that you want [3:43] to use, it looks like it's in use right [3:45] now. I think Macy's is using that. [3:48] I I sent some the the meter ID numbers [3:51] to Joyce. She's going to look into that, [3:53] but I still think we can uh [3:55] connect on the backside of that. It's a [3:57] 2-in meter. I [3:59] With your landscaping, I don't think [4:00] you'll need more than a 1-in line. [4:04] Uh and it also showed an RP on that [4:06] irrigation. [4:07] You can remove that. We don't need an RP [4:10] on our irrigation. If it was hooked to [4:11] culinary water, yes, that would be the [4:13] case, but our irrigation water, we don't [4:15] require an RP. [4:18] And as you noticed on the plans, you did [4:20] say we work with the city for the [4:22] culinary meter. We can Once you get to [4:24] that point, we'll [4:26] figure out where that needs to go. You [4:28] got a couple of options there [4:30] to look at that. Sewer's going to be [4:32] straightforward. It's just right out [4:34] front, so I don't see any issues with anything else. [4:38] >> So Jason, what I would say on that is [4:40] if the if that irrigation meter is in [4:42] place, you'll probably want to do some [4:43] exploration on where that stuff goes [4:46] after the meter. We know where it goes [4:47] to get to the meter, but [4:49] >> Yeah. [4:49] >> the Macy's development is relying on [4:51] that, you probably ought to make sure [4:53] that that somebody's not just going out [4:55] there and [4:56] digging up a 2-in line that goes [4:58] to all of their landscaping, that'd be [5:00] bad. The other The other thing I would [5:02] say is when you say the the culinary, [5:04] you're talking size or location of [5:05] connection. [5:06] >> Uh location of connection and placement [5:08] of meter. [5:09] >> Okay, the box. [5:10] >> Yeah. [5:11] >> Okay. [5:11] >> Yeah. [5:11] >> Cuz none of it will be in our [5:12] right-of-way, right? There's not really [5:13] a park strip or anything that's going to [5:15] allow for that. [5:16] >> Yeah. [5:17] >> Okay, thank you. [5:18] >> Uh [5:20] Quick question for you, Jason. Uh a few [5:22] that I have for you on on this if you're [5:24] done with your your comments. [5:26] >> Yeah. [5:27] >> Um one, they're showing a 1/2-in [5:30] a inch and a half copper for the service [5:33] line on there. [5:35] I mean, copper's okay, but it may be [5:38] better for you to do a a poly line. [5:41] >> use plastic. [5:42] >> Yeah, I'd be Yeah, I Sorry, I didn't see [5:44] that. Thanks for catching that. Yeah, [5:46] Definitely go with poly. [5:49] Yes. [5:51] >> That's going to be easier to install for [5:53] that whole thing. [5:54] Um, also, this will probably be more [5:57] related to the building permit once it [5:59] comes in. [6:00] But, just so you're aware of it, there [6:03] is going to need to be a an RP [6:05] check valve that's with the building. [6:08] And associated with that, there will be [6:10] required testing that will need to be [6:11] submitted. The the contractor who builds [6:14] the site will have to install that and [6:16] test that RP, [6:18] um, and provide that testing results to [6:21] the public works department. Um, and [6:23] then also [6:26] Sorry, continual testing, [6:28] uh, just throughout after the fact. Um, [6:30] annual testing after. [6:31] >> I can see it looks like where the grease [6:33] trap back off the back side there, is [6:35] that correct? [6:36] >> Yes, there is Yes, there's a grease trap [6:38] installed right, um, that'll be on that [6:41] back side there. [6:42] Yep. So. [6:45] Okay, anything else, Jason? [6:47] >> No. [6:48] >> That's all. [6:48] >> Mike, please. [6:50] >> Just a couple things, um [6:53] Are we [6:54] Is that North Orchard Lane, is that a [6:56] city road or is that private road? I [6:58] don't don't know what we're doing. [7:00] >> All All these roads within here, aside [7:02] from 400 East [7:03] >> I assume it's private, right? [7:05] >> Okay. [7:06] >> Those are private. [7:06] >> I was going to say, we would prefer a [7:07] stop sign before you enter North Orchard [7:10] Lane. However, we can't [7:12] force that because it's private [7:14] property. [7:15] >> I think there's one shown there. [7:16] >> Is that what that is? I couldn't tell. [7:19] >> Yeah, there's a stop [7:20] >> Okay, good. All right, [7:22] perfect. [7:23] >> There will be a [7:25] >> Awesome. [7:26] >> So, yeah, so there will be stop sign [7:27] here and a no entry [7:29] >> Okay. [7:29] >> sign here, no entry here, and then a [7:31] stop [7:32] um, and then a stop sign here as it goes [7:35] to the south. [7:36] >> Very cool. And then, the only other [7:37] thing I have, if you'll go to the [7:38] landscape map [7:41] I know we have requirements, but we've [7:43] dealt with this in the past. Um coming [7:46] out through the drive-up, that big tree [7:48] that your hand was just over, both of [7:50] those [7:51] are, you know, obstruct view from people [7:53] pulling out. [7:56] And I don't love that. [7:59] So, I don't know [8:00] So, basically, you look at people and [8:02] say, "I hate trees." Yes. [8:05] But we dealt with that just barely over [8:07] by Little Caesars and ended up tearing [8:09] one out because we made them put it in [8:11] and then made them tear it out. So, I [8:12] would prefer not to have that there. [8:14] >> Yeah, we can I say we'll add a note to [8:16] have it just They still have to have the [8:18] number of trees, but we can talk about [8:20] the location of those to help [8:21] >> They could They could pull those two and [8:23] put them back down towards the west [8:25] right on both of those potentially. That [8:27] would probably be better as long as [8:29] we're not getting [8:30] too close to 4th East on that one that [8:32] gets relocated. Maybe it follows the [8:34] curve. Yeah, and it goes Yeah, along [8:36] curve instead of [8:38] along what they're calling Orchard Lane. [8:40] We Also, please take those names off of [8:42] there. Those aren't 100 North and are [8:44] not Orchard Lane. That just confuses [8:47] people. [8:47] >> Yes. [8:51] » That's all I have. [8:52] >> Okay, sounds good. [8:54] >> You could even label that as just [8:55] private access or something like that or [8:57] just access. [8:58] That That's really what it is. It's all [9:00] private property with access to all the [9:01] buildings and everything around there. [9:06] » Uh fire department didn't have We didn't [9:08] have any issues with it. [9:12] » Norm? [9:13] >> Yeah, so I wanted to clarify. It looks [9:15] like two lanes going through there. Not [9:17] both of those are intended to be like [9:20] drive-thru lanes right for ordering. The one lane is like a slip lane to just [9:24] get people past if they need to jump out [9:26] and [9:27] go around, right? They're not [9:28] >> It's a bypass. [9:29] >> Okay, all right. That That was the only [9:31] question that I had on what I had sent [9:33] seen on the plans. [9:37] » Okay, with that, I'll just kind of run [9:39] through see if there's anything we [9:40] didn't cover. [9:43] Um [9:44] I'll do just [9:46] uh let's see. We already talked about [9:49] that. Just um [9:51] quick clarifications on on these the to [9:54] build on Aspen's, you know, comment [9:56] there the the trash enclosure does need [9:58] to be similar materials to the the main [10:01] building. [10:02] >> Okay, we showed what currently so if you [10:04] just use [10:07] » It could be similar to that and that [10:08] would be looked at with the ARC. So, [10:10] just make sure you include that detail [10:13] with it. And [10:14] again, this is a very prominent location [10:17] on that and so [10:18] >> Can we also ask on that one and maybe [10:21] even the tree placement that we're [10:23] talking about moving down on the curb to [10:25] have you add in our our sight triangle [10:27] requirements just in dashed or dotted [10:29] lines just to kind of show and make sure [10:31] that the first of all that dumpster and [10:33] then the other tree is not going to be [10:34] in the way of a [10:36] and I'm talking about coming out on the [10:37] 4th East not necessarily internally [10:39] although you could do it there as well, [10:41] but putting a sight triangle on there [10:42] helps us to understand that we're not [10:44] going to have the visibility issues that [10:46] the Lieutenant Wallace that was talking [10:48] about. [10:48] >> Yeah, absolutely. [10:49] >> Okay, that'd be great. [10:53] Okay, [10:54] um [10:55] >> You can find those in our in our specs [10:57] by the way in our [10:58] >> It's in our code under title 10. [11:00] >> Yeah, under 10-16 standards you can find [11:02] those in there. [11:06] » Okay, [11:08] um [11:09] So, storm drain on this I recognize [11:12] you're tying into the existing storm [11:14] drain facility that's related to the [11:16] overall site. [11:17] >> Yeah. [11:17] >> We'll just need basically confirmation [11:20] that the that the existing pond that's [11:22] located on the east side of the the [11:24] Macy's building that that pond is sized [11:27] appropriately to be able to handle the additional volume that's going to be [11:32] generated. [11:33] Um [11:35] in reviewing it appears that the overall [11:37] site intended to have this pad be able [11:41] to serve into that retention pond, but [11:43] we'll just need the verification that pond is adequately sized to be able [11:47] to accommodate this additional volume. [11:49] >> Do you know where I might be able to get [11:51] a copy of the drainage study for that [11:52] property? [11:53] >> Um if the develop if the overall [11:55] developer doesn't have it, um [11:58] we should be able to provide that to you [11:59] as well. [12:00] So. [12:02] >> Thank you. [12:06] » Um and then for Randy mentioned it [12:10] earlier, just the grease trap. Make sure [12:12] you're referencing [12:14] uh [12:15] set our we do have a grease trap [12:18] standard within the standard [12:19] specifications. It's S as in Sam 5 [12:24] uh to to be able to get that. [12:27] >> Thank you. [12:28] >> Um [12:30] additionally, because the [12:33] our our city standard requires for all [12:35] storm drain curb inlets to have a snout [12:38] on them. [12:39] However, because this is a private [12:41] system, that's not required, but it's [12:44] very recommended. Uh I just it'll help [12:47] with long-term maintenance of that [12:49] system um for the property owner. [12:55] » Thank you. [12:57] >> Um I believe [13:01] we talked about signs. [13:06] Uh landscaping there. Um just one [13:09] question that was had um [13:13] there's not intended to be any outdoor [13:16] dining associated with the site. Is that [13:18] correct? [13:18] >> Correct. [13:19] >> Okay. Um we've just seen some other [13:22] sites have afterwards have come out and [13:24] trucked a to picnic table outside and [13:27] put it on the gravel. Um that does [13:29] impact parking and that kind of stuff. [13:31] So [13:31] >> Yeah, Dollar Clay specifically does not [13:34] >> Okay. [13:37] Good to have cuz that will also help [13:39] with your parking that we talked about. [13:41] >> Sure, thank you. [13:43] >> Um [13:44] again, we've already talked about [13:45] landscaping comments. I Oh, we didn't uh [13:49] So, this one um maybe Aspen if you'll [13:52] cover that. [13:53] >> probably cover better than me. [13:54] >> Um it just is helpful if you show the [13:57] percentages of each material being used [13:59] because our code requires that uh [14:02] decorative material such as like crushed [14:04] rock can only make up 50% of the [14:06] landscaped area. So, you may potentially [14:08] need to add more live plants. [14:11] >> Okay. [14:11] Thank you. [14:13] >> And those don't necessarily need to be [14:14] trees. They can be shrubs or that kind [14:17] of thing. Okay, thank you. [14:20] Okay, [14:21] and I believe [14:24] Oh, yeah. [14:25] >> Yes. Uh Aspen mentioned this earlier [14:27] just providing a a detail of the your [14:29] proposed site lighting. [14:30] >> Okay. [14:32] Like the fixture detail? [14:34] >> Yeah. [14:37] Uh I already talked about the [14:38] requirement for ERC. [14:41] And I think that was it. [14:43] Along there, all the comments. Anything [14:45] else? Any other comments or questions [14:48] that [14:49] anyone had? [14:53] If not, I would I would look for a [14:55] motion. [14:58] So [15:00] >> John, I think there's enough hanging out [15:01] there still with the storm drain and [15:03] some of the other things that we've [15:04] talked about it's probably as [15:06] appropriate to table and have them bring [15:07] it back when it's ready. [15:08] >> Okay. [15:08] >> I'll make a motion to table at this [15:10] point in time. [15:10] >> You got a motion to table. Is there a [15:12] second? [15:13] >> Second. [15:14] >> Seconded by Randy. [15:16] Any discussion on that motion? [15:19] If not, all in favor, please say I. [15:21] >> I. [15:22] >> Any opposed? [15:23] Okay. [15:24] Motion passes. The application is [15:26] tabled. We'll get a copy of these with [15:29] There are a couple other comments we'll [15:31] add that weren't on here. We'll get [15:33] those added and get them sent over to [15:34] you [15:36] latest probably tomorrow. [15:37] And that way you've got those to work [15:40] um [15:41] If you can get these turned around and [15:43] into us within the [15:45] So, we'll have about a week time for us [15:47] to review it before the next DRC. [15:50] Um our next DRC is in 2 weeks. It'd be [15:53] the second So, the 26th approximately. [15:56] Um so, we had those a week before then, [15:58] we could probably get it on the next [15:59] DRC. [16:01] So. [16:03] Yep. [16:05] Okay. Uh next item on the agenda is the [16:07] approval of the meeting minutes from [16:09] April 14th. [16:11] If there are any comments, I'll look for [16:12] a motion. [16:13] >> Y'all know I'm making a motion that we [16:15] approve the minutes from DRC from April [16:17] 14th, 2026. [16:19] >> Okay. Got a motion. Is there a second? [16:21] >> Second. [16:21] by Alan. [16:23] All in favor, please say I. [16:25] >> I. [16:26] >> Any opposed? Okay. Motion passes. [16:30] And if there is not anything else for [16:32] the DRC, I'll look for a motion to [16:33] adjourn. [16:34] >> So moved.