[0:10] Thank you. [0:13] All right, we'll get the [0:16] See where you August 11th [0:19] DRC meetings kicked off and going. It is [0:22] 10:00 a.m. So [0:24] First item of a business um [0:29] If that's okay with the DRC, we may [0:31] adjust the the order of the agenda cuz [0:34] we do have the applicant here for the [0:35] Scenic Ridge plat phase E preliminary. [0:38] Is there any concern with moving that up [0:41] first to review? [0:42] >> No, let's move him up. [0:43] >> Okay. [0:44] Sounds good. So the first item we'll [0:47] review is the Scenic Ridge subdivision [0:51] phase E. [0:52] Um this is part of the [0:55] Scenic Ridge the last the final [0:58] uh phase that we'll start reviewing [1:00] relate to this project. It's up on the [1:02] East Bench off of 1200 East and 450 [1:05] South. [1:07] Um [1:08] phase currently under [1:10] that we're reviewing today is the the [1:12] red section indicated here. [1:15] Um [1:15] there's three proposed lots and then the largest eight lot associated with [1:19] this this phase. [1:22] Um [1:22] this is a preliminary review of this [1:25] application. [1:26] Um and so the DRC's role today is to [1:30] provide a recommendation to Planning [1:31] Commission. [1:33] Um some background on it. This [1:36] subdivision all the improvements have [1:38] currently been [1:40] uh [1:41] constructed. Um [1:43] and the utilities are stubbed to the [1:46] lots as um were previously so um again [1:50] all infrastructure has been installed. [1:52] This is just a review of of the plats [1:54] and phases related to this site. [1:57] So um with that the DRC with any [2:00] thoughts or comments or questions that [2:02] we may have. So, [2:04] starting with Aspen with planning. [2:07] >> I don't have any comments. [2:08] >> Okay. [2:09] Randy with building? [2:11] >> I've got three addresses on this, but I [2:13] know it's realized it's just preliminary [2:15] at this point, but that is ready. So, [2:17] other than that, I have no comments. [2:18] >> Okay. We'll add those to it. So, [2:21] Ryan with fire? [2:22] >> No, these improvements are already in, [2:24] so there's nothing else. [2:25] >> Okay. [2:26] Jason? [2:27] >> I don't have any comments, and [2:29] we'll just chime in on redlines as [2:30] needed. [2:31] >> Okay. [2:32] Uh there's not a whole lot of comments [2:34] on here. I'll kind of just start with [2:35] the plat. [2:36] Um [2:37] just a verification and check on the [2:39] boundary description. [2:41] Um [2:42] to make sure that the section ties seem [2:45] a little off, so we just wanted to check [2:46] those, make sure we're good there. [2:48] is a note that needs to be [2:49] included on all plats. [2:51] Um basically just saying the contractor [2:54] needs to understand that um [2:58] that all ins- uh improvements need to be [3:01] installed according to San San Clemente [3:03] standards and specifications. [3:05] Um [3:07] I'll probably address this next comment [3:09] on the following sheet. It could [3:11] illustrate it a little better. [3:13] Right now shown on the the plat itself [3:17] is [3:18] just these three lots being split off [3:21] from the main lot. [3:22] Um [3:24] typically when there's a fourth when [3:26] there's a parcel remaining after the [3:30] rest of it that's not going to be [3:31] installed, the entirety of the project [3:34] needs to be included within the plat [3:35] itself. [3:36] And so, it's something we [3:39] um [3:40] we do need to confirm a little bit. I'd [3:42] work with you on that and this nail a [3:43] little bit on the including that in the [3:48] entirety of the project of that lot [3:51] within the plat itself. [3:53] Um so otherwise it remains a parcel that's still a [3:58] single parcel being split into four [4:00] lots. And um [4:04] when that and one one's building lot as [4:06] well when they're all improved finalized [4:09] lots they typically include it on the [4:11] plat itself. [4:12] So we'll need to work on work through [4:15] that with you on this one. [4:17] >> something that [4:20] Josh [4:21] who put in the lot with [4:23] >> Yes. [4:25] Yep. So uh basically this plat sheet [4:28] would just expand a little bit and [4:30] include the entire boundary for for [4:33] yours. So. [4:36] just for the record the question was [4:38] is who addresses that and that would be [4:41] the the engineer and the surveyor doing [4:43] the project. [4:46] Okay other than that I don't there's [4:48] only one other comment um [4:51] it's regarding the the channel behind [4:53] there. [4:54] Um with this phase going in [4:56] um we do need to coordinate on [4:59] making sure that facility is is [5:01] installed. Whether it's the channel [5:03] itself [5:04] or which is the city's responsibility or [5:08] the pipe which um [5:10] for the development agreement would need [5:12] to be installed. So we just need to work [5:13] and make sure that that's that's getting [5:15] done with this phase. [5:19] Other than that I don't believe we had [5:21] any other [5:22] comments. [5:28] No. [5:33] Okay. [5:34] Um [5:35] with that if there any other comments or [5:37] thoughts [5:41] seeing none I would would look for a [5:43] motion. [5:48] » I'll make the motion we move it forward [5:50] to the planning commission based on the [5:52] red lines being addressed. [5:53] >> Okay. [5:54] I have a motion. Is there a second? [5:56] >> I'll second that. [5:57] >> Second by Randy. [5:59] Any [6:00] thoughts or comments on the motion? [6:03] No? [6:04] All in favor, please say aye. [6:06] >> Aye. [6:06] >> Any opposed? [6:08] Okay. Motion passes. Um we'll get these [6:10] sent over to you and work on on that [6:12] plan. So, [6:13] thank you, Neil. [6:15] Um [6:16] next item on the agenda. Are you here [6:19] with the vet clinic? [6:19] >> Yes. [6:20] >> Maybe we'll So, okay, we'll jump the vet [6:22] clinic up as well cuz we have there. [6:25] So, next item on the agenda we'll it [6:28] will review is review the Santaquin Vet [6:31] Clinic. [6:32] This is a site plan [6:34] um [6:35] located on the west side of town [6:37] adjacent to the Santaquin Peaks [6:39] Industrial [6:40] uh subdivision. [6:42] This is not it's adjacent to it, so just [6:46] kind of to the to the east of the [6:49] subdivision that was installed a couple [6:51] years ago. Um another point of reference [6:53] is the TPW site, which is kind of north [6:55] and and east of of this site. [6:59] Um this is a site plan application. Um [7:02] so, the DRC is the final approval body [7:04] for for this application. [7:07] Um [7:08] and [7:10] yeah, with that with that we'll go [7:12] around DRC with any thoughts or [7:13] comments. All right, Leslie. [7:15] >> Will we go to the landscaping page on [7:17] page nine, please? [7:18] >> Mhm. [7:20] >> Some additional landscaping needs to be [7:22] shown. Uh for example, the spaces right [7:24] behind the building. We need to know [7:26] like what material's being used because [7:29] the whole site must be landscaped. Uh we [7:31] also need a data table provided to show [7:34] that 8% of the site is being landscaped. [7:38] Um keep in mind that 50% of landscape [7:41] materials needs to be live plant [7:43] material. That's measured at the full [7:45] plant maturity. [7:47] And then around the trash enclosure, we [7:49] need to require four shrubs per three [7:51] sides. [7:53] And then same with the plant island, [7:55] some shrubs need to be included in that [7:56] as well. [7:59] >> Ashton, if I can maybe piggyback on that [8:00] a little bit. Uh [8:02] can you help us understand uh directly [8:04] behind the building? Do you have any [8:06] plans there for either driveways or [8:08] walkways or [8:10] Right right where the the cursor is, [8:11] right in between the parking and the [8:12] building. Is there plans for that or [8:15] >> Uh [8:16] I'd have to check. [8:19] I'm not sure yet. [8:21] >> Is that Is the light on the microphone [8:23] on? [8:24] >> Turn the little green light on. [8:25] >> All right, there we go. Okay, I'm not [8:28] sure on that. I know that they do want [8:30] to [8:31] uh access from the parking lot back [8:33] there obviously to the basement of the [8:35] building. So [8:35] >> Perfect. Yeah, if if if you can just [8:37] show some If you can show that and then [8:39] as Ashton talked about, and really the [8:41] landscaping is is that access road to [8:44] the north cuz everything down below will [8:46] be kind of a future phase, but you know, [8:48] the area immediately behind I mean, [8:50] you've shown everything on the sides and [8:52] the front, but that whole area that he's [8:54] highlighting is is really what we're [8:56] honing in on on the landscaping [8:57] requirement. But any other details about [8:59] access and things like that will will [9:01] really help us to to you know, [9:04] understand what what the plan is for the [9:05] site. [9:06] >> Can I ask a question there? I mean, a [9:08] lot of vet clinics use stalls or [9:10] something for [9:12] It doesn't make sense to require [9:13] landscaping if they're going to rip it [9:15] out and put [9:16] future enclosures for there for animal [9:18] care. You know what I mean? Is there [9:19] going to be stalls back there? And [9:21] that's something we're going to need to [9:21] ask the the vet. Does he have horse [9:24] stalls or pens or kennels for dogs? It [9:27] makes no sense to require them to [9:28] landscape it and spend that money to rip [9:31] it out and put a kennel there. [9:32] >> Well, and I guess that's the thing is is [9:34] we need to know what the plan is cuz if [9:35] right now if it's all just going to be [9:37] kind of blank and vague vacant, then our [9:38] code requires that it be, you know, uh [9:41] improved to some point. Now, it may not [9:43] be [9:44] landscaping, [9:45] um [9:46] uh in the traditional sense, but at [9:47] least have some sort of a ground cover [9:49] so that it's not just, you know, uh [9:51] raw. [9:52] >> I just don't want to see him be required [9:54] to put all these trees and shrubs if [9:55] he's going to put kennels there and have [9:57] to rip it all out. There's no sense [9:58] wasting money. [9:59] >> We'll show what the plan is. We'll talk [10:01] with the architect and the vet, so see [10:03] what they want. So. [10:04] >> And if their plan is to do that in the [10:05] future, then for the time being they [10:07] need to do something to treat the ground [10:08] so that it's not just weeds. [10:12] Right, but this is This is a site plan [10:15] for an improvement. [10:19] » Okay. Anything else, Aspen? [10:22] >> Just on the site plan on page two, [10:24] um if you'll just continue the [10:26] pedestrian access for the future trail [10:28] that will run along Summit Ridge [10:30] Parkway. [10:35] Oh, and then your parking stalls in the [10:36] back, they're only 18 ft, which we [10:39] allow, but it has to have a 5-ft wide [10:41] landscaped area or a 6-ft wide sidewalk. [10:44] >> Okay. [10:45] >> So, just keep that in mind. [10:48] And that's everything. [10:50] >> Okay. [10:51] Randy, it's building? [10:53] >> I don't have anything at this point, so. [10:55] >> Okay. [10:56] Ryan? [10:57] >> I know that there's a fire hydrant that [10:59] you show more on the southeast corner of [11:01] that. [11:02] Uh I know John and I have discussed that [11:04] there's one potentially already going to [11:06] the north. [11:08] >> Yeah. So, on that [11:10] So, part of [11:12] um [11:13] the agreement was that we did need to [11:14] provide a fire hydrant for the site. [11:17] Right now, the fire hydrant's it's been [11:20] stubbed out, pipe has been stubbed out [11:21] of the out of the We've connected the [11:24] 10-in line and stubbed it to about right [11:26] here. We haven't brought the fire [11:27] hydrant up just because we wanted to [11:29] make sure we weren't conflicting with [11:30] the site plan. [11:32] Okay, so we're [11:34] right now where the pipes currently [11:36] extended is roughly in this area. [11:39] And so with that, if we have a fire [11:41] hydrant here in this location, [11:44] um the thought is that we wouldn't need [11:46] to install this fire hydrant or the [11:49] applicant wouldn't be required required [11:51] to install that fire hydrant as part of [11:53] their site plan. [11:55] >> Okay. [11:56] >> so long as that's within 100 ft, which [11:59] we can do that, that fire hydrant [12:01] wouldn't be needed. [12:02] >> Correct. You don't have to put two that [12:04] close together. [12:04] >> Okay. [12:05] >> Yep. [12:08] So. [12:09] Hey, anything else, Ryan? [12:11] >> No. [12:11] >> Okay. Jason? [12:13] >> I don't have anything to add except I [12:14] think we need to add a note um [12:17] for just architectural renderings, when [12:19] she get that ready, just give that to us [12:21] and and uh because of this being [12:25] uh [12:26] kind of a specific industrial site with [12:28] uh [12:29] the specific agreement that [12:31] uh is there with the city, we'll review [12:33] it kind of more internally. There's not [12:34] necessarily you know, official ARC [12:37] review, but any anytime you get that rendering [12:40] uh ready to go, send it to us and we'll work with with you on that. [12:45] >> Okay. [12:45] >> Um that's a redline. I don't think that [12:47] made it there, so we [12:47] >> It did not. [12:48] >> add for AR or architectural review. [12:52] Um but on top of the redlines that you [12:54] have, I don't have any have anything [12:55] more to say. [12:57] >> Okay, we'll go through these here real [12:59] quick, anything that we haven't covered. [13:01] Um [13:02] and just comment on the the dimension of [13:05] parking stalls, making sure those meet [13:07] our code there. Um it seems like they [13:10] may be a little short. Is that [13:13] correct? [13:14] >> Well, yeah, cuz if we allow the 18 in [13:16] today, [13:17] either the lines are [13:18] >> We'll have to have sort of landscaping [13:20] or sidewalk here, 6-ft sidewalk there, [13:21] so. [13:23] We've already talked about access to the [13:24] building from that parking lot. [13:27] Um [13:28] And that access there, it's really just [13:30] striping [13:31] for that connection cuz you're able to [13:33] come right up necessary to the property [13:35] line. And then as we get that trail [13:38] built, there'll be a connection at that [13:40] point. [13:43] » And will you just label this triangle [13:45] piece that's not necessarily getting [13:47] constructed out just as a future phase? [13:49] >> Okay. [13:50] Or whatever that yeah. [13:52] >> Whatever it's going to be. [13:53] >> it's planned to be future phase. But [13:56] just so it's clear on there. [13:57] >> Hey John, and in that [13:59] what they he's labeled as pond one, [14:00] that's serving the the entirety of the [14:02] project or just the the first phase if you will? [14:07] >> Right now it's designed to take all of [14:08] the storm water from the parking lots [14:10] and everything and store it there. It [14:12] flows in and into a curb inlet down here [14:15] in this corner and then dumps in. [14:17] >> Okay. [14:17] >> So if there's [14:19] >> So is that going to have to be developed [14:20] that would need to be resized? [14:22] >> Resized. [14:22] >> Okay. And I do know what and I guess you [14:25] have a red line on it, but I I think you [14:26] showed a pipe [14:28] going from that pond just just uh [14:31] >> That's correct. That's right here. [14:32] >> Just going onto the Yeah, we we we can't [14:35] have that. Uh you got to keep the the [14:37] storm water completely on site and [14:40] controlled on site. You can't have a [14:41] pipe that just is [14:43] put you know, shooting that water off [14:45] onto the adjacent property which [14:46] happens. [14:46] >> Yeah, so that would be the overflow [14:49] meaning the rim of that box once that [14:51] pond fills completely then what's spill [14:53] over into that box. There's no lower the bottom of the pond [14:58] isn't flowing out of that. It's just [15:01] when it starts to overflow so it doesn't [15:03] go over into all that wall that we have [15:06] there that it gets captured by that box [15:08] and then is conveyed under. [15:10] >> So yeah, regardless of that, you you [15:12] can't have a pipe that's overflowing off [15:14] into the adjacent property. If if an [15:16] event gets big enough that it naturally [15:18] overflows then that's that's going to be [15:20] a [15:21] I you know, I would just worry about the [15:22] retaining wall. [15:23] The structural integrity of the [15:24] retaining wall having water just go onto [15:27] that, but [15:28] >> Whether it's say yeah. [15:30] >> No, it can't be necessary pipe. If they [15:32] want to do some surface improvements [15:34] after to to get it there, [15:36] um that would be adequate on that. [15:38] >> Okay. [15:42] um let's see. Going to this, the other [15:44] comment is we can provide you updated [15:47] GIS cuz this is something that actually [15:48] was just installed within the last [15:49] month. We'll send you updated GIS with [15:52] the fire line that we talked about [15:54] earlier, the fire hydrant line, and the [15:58] uh culinary connection. It's actually [16:00] 2-in connection that's been installed [16:02] there. [16:02] >> Okay. [16:05] » Um one other item we wanted to discuss [16:08] is the sump location. Um [16:12] this is a sump that [16:13] captures what's coming off of Summit [16:15] Ridge Parkway. We just like to um [16:19] coordinate uh the location of that. [16:21] Where it's located is um [16:24] provides maintenance struggles down in [16:27] the future for it wherever need to. We'd [16:29] rather prefer that to be outside the the [16:33] uh [16:33] asphalt there for the drive approach. [16:36] Um and to relocate that and push it [16:38] either further kind of north so it's out [16:40] of there. Um south it gets kind of [16:42] complicated with utilities. Uh maybe a [16:44] little spot here, but as you said, we [16:47] would probably help participate in the [16:48] construction of that. [16:49] >> Okay. [16:50] >> So, but if we can just update that to [16:52] show getting it out of the park strip out of that drive [16:55] approach. [16:59] Um let's see. [17:01] If I talked about that, that's the [17:03] outfall. [17:06] I believe and that's the landscaping [17:08] comments. I believe that's it. [17:11] So, [17:13] that's all the comments we've got on [17:15] this. If there's any others, [17:17] um [17:18] I look forward to any other thoughts or [17:20] questions on this. [17:24] » Thanks, Scott. [17:25] >> Okay. [17:28] If not, I would look for a motion. [17:33] » John, I think with the uncertainty of [17:34] what's happening behind the building [17:35] with the landscaping or or walkways or [17:39] potential stalls for animals or [17:41] whatever, uh I think there's a little [17:42] bit more information we need to be able [17:44] to approve this site a motion that we [17:46] table this site plan. [17:47] >> Okay. [17:48] Got a motion to table. Is there a [17:50] second? [17:53] » I'll second that. [17:54] >> Seconded by Ryan. [17:56] Any discussion on that? [17:59] If not, we'll go to vote. All in favor [18:01] of tabling, please say I. [18:02] >> I. [18:03] >> Any opposed? [18:04] Okay, motion passes. [18:06] We'll get these sent over to you again [18:08] so you can make the those corrections. [18:10] So. Okay. Thank you. [18:14] Final item on the agenda is uh review of [18:17] the Tanner Flats [18:20] phase five subdivision. [18:23] Um this is [18:26] um south of what's currently being [18:29] constructed. Um so this is you know, [18:31] I'll back up a little bit. This is [18:32] Summer Ridge Parkway. Tanner Flats is [18:34] located on the the east side of Summer [18:36] Ridge Parkway. [18:38] Um and that let's say they've had a [18:40] couple of phases they've been under [18:42] construction over the last two or three [18:43] years. [18:44] Um this is the fourth phase of it. [18:47] Um and there'll be one more phase after [18:50] that. [18:51] Um [18:53] Excuse me. So, this is a final [18:55] subdivision application. So, the DRC is [18:58] the final approval body for this. [19:01] So, that will go around. Aspen? [19:04] >> Uh just some cleanup items. As you can [19:07] see on the cover page it says phase [19:09] four. If we can correct that to say [19:10] phase five. And then just a reminder [19:13] with the park requirements, currently [19:16] you've been issued 44 building permits. [19:19] Um you just need to be aware 64 more [19:21] park improvements need to be done and [19:23] then no more building permits can be [19:25] issued until all the parks are done at [19:27] 104. [19:30] So. [19:30] >> So, and they have begun construction on park improvements now, but they still [19:36] have 20 or so building permits to pull [19:38] before that kicks in. [19:40] Okay? [19:41] >> Um I think that's everything from [19:42] planning. [19:43] >> Okay. Randy? [19:46] >> I went I remember going through this the [19:48] addressing on this, but I don't know [19:50] whether I got it into this file, but [19:52] we'll get on there and get it to them. [19:54] >> Yep. [19:55] >> Okay. [19:56] Other than that, nothing. [19:57] >> Okay. Ryan? [19:58] >> No, I don't have anything. [19:59] >> Okay. Jason? [20:01] >> I don't have anything either. [20:02] >> Okay. [20:03] Um there's one I'm going to point out. [20:07] For the most part, everything weren't [20:08] any other major uh comments on it. Um [20:13] there's one that's [20:15] uh [20:15] does need to be addressed. It's on the [20:17] plan and profiles regarding the storm [20:19] drain. [20:20] Um [20:22] right now as it's currently the design [20:26] doesn't match the preliminary approval [20:29] that was done. Um [20:32] and even the amended approval that was [20:35] done a couple about a year and a half or [20:37] so ago. [20:38] Um [20:39] right here on this sheet the storm drain [20:43] would drain back to uh [20:46] it drains away from the storm drain [20:49] retention basin that we talked about [20:50] earlier. And so there would be an [20:52] outfall somewhere on the south side of [20:55] the project. So, this does need to be [20:57] corrected uh to more closely match the [21:00] preliminary design and to make sure [21:02] we're not sending storm drain [21:05] back uh where it shouldn't be going. [21:08] So, and then there's a [21:11] one of the plan views doesn't match the [21:13] profile [21:14] on there. So, those are those are really all the [21:22] only comments that we have on this on [21:24] this set of plans. [21:30] So, is there any other comments, [21:32] thoughts, or [21:33] questions on it? [21:35] All right. [21:38] If not, I would look for a motion. [21:42] » I'll make a motion to conditionally [21:44] approve Tanner Flats phase five final [21:47] review once all redlines are addressed. [21:49] >> Okay. [21:51] We have a motion. Is there a second? [21:53] >> I'll second that. [21:54] >> Seconded by Randy. [21:56] Any thoughts on the motion or [21:57] discussion? [21:59] Seeing none, we'll go to vote. All in [22:00] favor, please say aye. [22:02] >> Aye. [22:03] >> Any opposed? Okay. [22:05] Motion passes. [22:06] Um [22:07] move on with that. Sounds good. [22:10] Last item on the agenda is uh approval [22:13] of the meeting minutes from July 28th [22:16] DRC meeting. [22:19] >> I'll make a motion to approve the [22:20] meeting minutes of July 28th, 2026 for [22:23] DRC. [22:25] >> Is there a second? [22:26] >> Second. [22:26] >> Seconded by Ryan. [22:28] All in favor, please say aye. [22:30] >> Aye. [22:31] >> Any opposed? [22:32] Okay. Minutes are approved. [22:34] And if there's not anything else needed [22:37] but to discuss by the DRC, I'll look for [22:39] a motion to adjourn. [22:40] >> So moved. [22:42] >> We are adjourned at 10:22.