[0:04] Thank you. [0:05] >> Goodbye. [0:11] » It's nice to see you. [0:12] >> Thank you. [0:14] All right, let's get the [0:17] August 25th DRC started. [0:20] Um it is [0:21] 10:30 a.m. [0:23] Uh [0:24] we'll dive right in. [0:26] Just looking at it. [0:28] >> Let me turn my mic on. Um [0:32] we have the applicant here for Apple [0:34] Hollow B5 [0:36] for that that review. Um so if there's [0:39] any concerns with the DRC, we may move [0:42] that one up on the agenda just to [0:44] >> Let's do [0:44] >> consideration for him. So. [0:47] Okay. [0:48] So for the Orchards B3, this is or say B [0:53] um [0:54] final phase for the Orchards [0:57] uh phase B. So this is located on the [1:01] west side of Center Street. It's the [1:03] last uh bank of town homes that um would [1:08] be constructed within this this [1:10] development. It includes the [1:12] construction of Ginger Gold Road from [1:15] uh and the completion of that roadway [1:17] and those improvements along there. [1:20] Um [1:21] this is a a final approval um for this. [1:25] >> It is actually final cuz it did receive [1:27] preliminary. Preliminary. [1:28] >> The agenda did I just noticed that did [1:31] say preliminary, but it is a final plan [1:33] review for this specific application. [1:36] So DRC is the approval body for the [1:38] final final approval on there. [1:42] Um [1:45] so with that, let me get the right plan [1:48] set pulled up. [1:50] So um again, this is [1:53] um [1:55] yeah, so it is this section here that's [1:58] shown [1:59] along the north side. It's the the last [2:01] bank of townhomes and does connect 260 [2:04] West over to 90 90 West as as part of [2:09] the development. It is [2:12] on it just so where where those roadways [2:14] are constructed a [2:16] uh [2:18] will be constructed a public to the city [2:20] standards and specifications because it [2:22] is a it will be a public road. And there [2:25] are not many private roadways on there. [2:27] >> Hey John, can you remind me on that [2:28] connection to 90 West? Does it take out [2:31] those existing parking stalls or do they [2:33] remain? [2:34] >> Yes, so [2:35] >> out a couple of them. Okay. [2:36] >> can see in there it removes those ones [2:38] and they are putting two [2:40] uh two new ones back. [2:41] >> and then other ones along the the [2:42] roadway there. Okay. Great. Thank you. [2:46] >> Um [2:48] So with that, we'll that introduction, I [2:50] will go around the DRC with any comments [2:52] or questions that that we may have on [2:54] it. We're starting with Morgan with [2:56] community development. [2:57] >> Uh thank you. So we need to have uh so [3:00] we need to install commercial grade weed [3:01] barrier um fabric. [3:04] And then also a data table that shows at [3:08] least 30% of the of the site will be [3:10] landscaped and of that 30% 50% shall be [3:14] of live plant material. So that needs to [3:16] be reflected in the table. [3:18] >> Yeah. So we'll pull up the landscaping [3:20] plans on that here real quick. [3:29] There we go. [3:30] So you're talking about the the fabric [3:33] through here and [3:34] as it's So anywhere that has the cobble [3:37] as shown needs that that weed barrier [3:40] fabric. [3:41] Okay. [3:43] >> It's not in the notes already? [3:48] » Um we'll need to verify. I don't believe [3:52] it is. [3:53] So, yeah, just a addition to the note on [3:56] there would be be adequate. [3:58] >> And yeah, the other was the the the [4:00] table for the 30% coverage for [4:04] landscaping and then of the 30% 50% [4:07] being of live plant material. [4:12] » And you just want to see that in a table [4:13] format. [4:14] >> Mhm. [4:14] >> Okay. [4:15] And that's 50% live plant material at [4:17] maturity, right? [4:18] >> Yep. [4:19] >> It's not at at inception. [4:21] >> Right. [4:24] » Okay. Anything else? [4:25] >> Yep, that's it. [4:27] >> Randy, with building? [4:28] >> I did not go through the address you [4:30] know on this because it said it was [4:31] preliminary, so I will do that and we [4:33] can get that sent off to you. [4:35] >> Okay. Sounds good. Thank you. [4:38] Jason, public works? [4:40] >> Just adding that PI drain that we talked [4:43] about yesterday. [4:44] >> Yep. [4:44] >> And then making sure that the manholes [4:48] and that are for the crossings that go [4:51] to the WRF [4:52] all of those are shown and and where [4:55] they're at on the plans we did they [4:57] weren't covered. I think you had a [4:58] comment on the lines also, so [5:00] >> Right. Yep. [5:00] >> And and then noted to be protected in [5:02] place, right? [5:03] >> Yes. Yes. [5:04] >> Yes. [5:04] >> Yep. [5:05] >> So, what that is is approximately this [5:08] location we've got the [5:11] um [5:11] our city facilities that get our uh, [5:14] from our lift station, Center Street [5:16] lift station um we've got an 18-in line [5:20] that runs through there and then heads [5:22] north across the railroad tracks. Um [5:25] those need to be shown and noted [5:26] protected in place for um for when a [5:29] contractor does come online there where [5:31] those those are in place. [5:34] >> So, John, they probably ought to show [5:35] the new lines and the existing lines [5:37] that were done with the [5:39] ULS pipeline, right? They did some [5:41] reconfiguration. Is that shown here in [5:43] the green and purple or is that not? [5:45] >> No, these these lines [5:46] >> you need [5:47] >> them with the with the GIS to have them [5:49] show that on there? [5:49] >> Yes. [5:50] >> Okay. [5:50] >> Yep, we will. [5:51] >> Just more than anything for the [5:53] contractor to to protect those. That's [5:56] Those are lines that we don't want to [5:57] hit. [5:58] >> Yeah. [5:58] >> We don't want to find them the hard way. [6:00] >> No. [6:01] Um on that same note, um [6:05] there is now with the Central Utah [6:08] pipeline being through there, um you [6:11] will need to work on with Central Utah [6:14] [snorts] Water Conservancy District to [6:15] get a encroachment permit for that. Um [6:21] uh because that line is in there and [6:23] it's um it's in operation. I from come [6:28] >> that from me. [6:30] >> Yes, we'll need to get that um [6:32] >> Well, they had to get it from me to put [6:34] their line in, didn't they? [6:35] >> Correct, yes. But [6:36] >> But but now it's in turn we get to go [6:38] back and visit with them about having an [6:39] encroachment permit within their [6:41] existing easement. [6:42] >> Correct. Yes. Now it just goes around. [6:45] So, [6:46] >> constructed these years ago, no? [6:48] >> [laughter] [6:49] >> So, but then just uh also something to [6:52] indicate, you know, for the contractor [6:54] when they do come in, [6:56] um [6:56] that that line is there. Uh it would be [6:59] could be impacted by it. The fact that [7:01] you're not putting any utilities over [7:03] the top of it um simplifies that [7:07] process. So. [7:12] Okay, Jason, any other comments? [7:15] >> we're good. [7:16] >> Okay. [7:17] Mike, police? [7:18] >> We've got nothing on this one. [7:20] >> Okay. Norm? [7:21] >> So, John, can you go back to the [7:22] original sheet, the first sheet in there [7:24] that shows the B I think it's B2 [7:27] improvements, the the landscaping right [7:30] there. [7:30] Is is that all done in the in the phase [7:33] next to it? Is that the the top lot and [7:36] the other stuff? Is that all [7:37] constructed? [7:38] >> This is not yet constructed. Is there [7:40] the units are still [7:42] These units are still under [7:44] construction. [7:45] >> And so as far as the development is [7:47] concerned development agreement is [7:48] concerned, they would need to have those [7:49] done [7:51] or and or bonded for, right, in order to [7:53] get to get CFOs in there as far as that [7:55] goes. [7:56] >> Yeah. [7:56] >> And and is it the plan to get those [7:58] constructed this year [8:01] this this construction season? [8:03] >> Uh I got a little Do you want me to go [8:05] up there? [8:05] >> Yeah, that'd be great. Good job, thank [8:06] you. [8:08] Oh, sorry about that. [8:10] We should have brought the microphone to [8:11] you. [8:12] >> [laughter] [8:14] >> So, [8:15] uh John Caldwell for Beer Homes. Um we [8:18] have a little elevation issue going on [8:20] right there. I don't know if any of you [8:21] guys have looked at it, but it from like [8:24] that 10-plex and those six-plexes the [8:26] six-plex and I believe that's a five, it [8:28] drops off quite a bit. Um looking at the [8:31] future road that's going in, that road [8:33] actually sinks down instead of you know, [8:36] that first road that we just put in at [8:37] the 10-plex [8:39] uh driveway space, that road actually [8:40] climbs, crowns in the middle and goes [8:42] back down. The next road down, I can't [8:45] tell the numbers on it, but yeah, that [8:47] road That one actually slopes down the [8:50] whole way. So [8:52] >> northeast. [8:53] >> Yeah, so we're going to have some major [8:54] elevation changes between [8:56] those that I don't think was accounted [8:58] for as far as that part goes. So, [9:03] my thinking is is we need to get that road in and put those build lift [9:07] those buildings up in elevation so that [9:08] we can [9:09] flatten that area out for the park cuz [9:12] right now, if you go back there, it's a [9:13] pretty good slope. [9:15] So, [9:16] I don't know [9:18] we could build up the ground and [9:21] just, you know, slope it off hard to [9:23] that next phase to get that landscaping [9:25] in. [9:26] But I kind of need to get that road in [9:29] and [9:30] kind of building into [9:31] >> to clarify, so are you talking about the the 960 North [9:35] is going to have to be different from [9:37] what's designed or you just need to the [9:39] material there to go into the park area. [9:42] Is that what you're you're talking about [9:43] the X that you got to excavation you got [9:45] to do to get the road built? [9:46] >> Right. [9:47] >> that stuff into the to the [9:49] playground area. Is that what you're [9:51] talking about? [9:51] >> Yeah, I got to figure out those that [9:53] there's just a big slope. So, I got to [9:55] figure out the elevations and then in [9:56] order to do that kind of need that road [9:57] in to see how much it's going to change. [10:00] >> But not changing the slopes of the road [10:02] and storm drain and all that kind of [10:04] stuff you're talking about about using [10:05] the material from there. [10:06] >> Correct. [10:07] >> Okay. [10:07] >> It's doable. It's just uh [10:09] that's why we haven't uh especially [10:11] where it's really tight between the [10:12] Tenplex and that next you know, that [10:14] little sliver area right there. That's [10:17] pretty steep. Um which there's no [10:18] playground it can be um right there. But [10:21] as we go towards the playground and [10:22] stuff, I just need to get that yeah, [10:24] leveled out and then figure out where my [10:26] slope is down to that next phase. So, [10:28] that's kind of what we've been waiting [10:29] on and we got to get the buildings in. [10:31] >> And I'm not trying to convolute the two. [10:33] I'm just want to make sure that you're [10:35] aware that for CMOs that you've got to [10:36] have that stuff taken care of. [10:38] >> Yeah. [10:38] >> Um I did have another thing on this. Do [10:40] we have or do we need [10:43] Jason and John a PI or a culinary [10:46] connection on the north side of Ginger [10:47] Gold Road? [10:50] >> No, we've got [10:51] >> There's no light plant material going in [10:53] over there as far as the trail section. [10:56] >> There are there are [10:58] Yeah, there are some some [11:01] uh [11:02] basically zero scape uh zero scape. I [11:05] never get those two [11:07] the right way. But there are some [11:09] plantings across there. Um but I believe [11:12] we've already got a PI connection [11:15] on to the north side of the road to be [11:17] able to tie on to and serve those. [11:20] >> Yeah, the the one I know about is on [11:22] Ginger Gold Ginger Gold and Center [11:24] Street. [11:26] Clear down there. [11:26] >> That's kind of a long way. So, I'm just [11:28] I'm going to encourage you from [11:30] engineering and public works to look at [11:32] it and if we need a PI connection there, [11:34] let's get a PI connection on the north [11:36] side of the road there so we don't have [11:37] to run 1,000 ft of line to be able to [11:39] water some trees. [11:40] >> Okay. [11:41] >> Yep. [11:42] >> That's that's all I have from what I [11:44] reviewed. [11:45] >> Okay. [11:47] Um [11:49] So, this note is just kind of what we [11:51] talked about before. Um [11:54] just coordination with the Central Utah [11:57] for that [11:59] um for that easement and any [12:00] encroachment into there. [12:04] Um [12:06] And we've already kind of Basically, [12:08] that existing easement will also need to [12:10] be indicated on the plat. [12:12] Uh couple comments on the boundary [12:14] description just to verify. It seems [12:17] like [12:18] there may just be a a swap number or [12:20] something [12:21] on the boundary [snorts] description. [12:23] And then just an update on the [12:24] legislative body. Uh city council's no [12:27] longer the the signers on that. It's the [12:29] planning commission chair that does [12:31] that. [12:38] Uh cover sheet there. [12:45] Then we'll need one on the say the south [12:49] side. There's uh we're missing a PI [12:51] connection down through here. [12:53] Um We already discussed the [12:55] >> And maybe on that note to just check and [12:57] make sure that to add a one on the north side of Ginger Gold as [13:00] well. [13:03] So, this this project is doing the trail [13:05] segment, right? You're doing the trail [13:06] segment, the landscaping, [13:08] >> [clears throat] [13:08] >> trees, whatever that happens to be, [13:10] right? And we just need to make sure [13:11] we've got water there and we don't have [13:13] to go [13:15] three blocks. [13:15] >> Yep. [13:17] >> Do we have street lighting that also [13:19] goes down that, right? That would be [13:21] opposite that could be on that north [13:23] side. [13:23] >> That's correct. [13:24] >> We just probably want to make sure we, [13:26] you know, get that connection close to [13:29] a street light where we can pull power. [13:30] >> Yep. [13:31] >> Okay. [13:35] » Um then just a note here um for the [13:38] storm drain line that goes between units [13:40] 79 and 80 uh just on the plat we'll need [13:43] to have a an easement for that storm [13:45] drain line. [13:49] Landscape and we've talked about the grading plan. [13:55] I believe there's any other [13:56] Those are just continuations on there. [13:59] Um [14:04] Then just down here uh we will need to [14:07] get a PI drain installed on the [14:09] irrigation line that will drain into [14:12] manhole of the curbing lot blocks there [14:14] to allow us to drain our system. That's [14:16] just a a 2-in uh [14:19] poly line with a social drain and and saddle. [14:27] And then for construction side of things [14:30] putting in a construction valve at the [14:31] face [cough and clears throat] line um [14:33] cuz I'm sure your contractor is not [14:36] going to want to test [14:38] what line has already been installed. So [14:44] » So John, is that drain for the new PI [14:47] line? There's no PI line there now, [14:48] right? They're going to bring [14:50] and connect from both sides on [14:51] Gingergold, right? So that's the drain [14:53] for Okay. [14:54] >> Yeah, so between 90 West and 260 West um [14:58] there's not a PI line there. [15:00] >> Great. [15:03] » Uh [15:04] cross sections, I believe that was it. [15:12] Yep, that that's it. So any other [15:15] comments, thoughts on the [15:19] on [15:21] Orchards B3? [15:26] If not, I would look for a motion. [15:29] >> John, I'll make a motion to approve [15:31] conditionally that the red lines are met [15:34] uh as we've discussed here and [15:35] identified and at Randy adding his [15:38] addressing back into it. [15:39] >> Okay. [15:41] Motion? Is there a second? [15:42] >> Second. [15:43] >> Seconded by Jason. [15:45] Any comments on the motion? [15:48] Seeing none, we'll go to vote. All in [15:50] favor, please say aye. [15:51] >> Aye. [15:52] >> Any opposed? [15:53] Okay, motion passes. It's approved. [15:55] We'll get these comments over to you, [15:57] John, and we'll work through those. So. [16:01] Okay, the next item on the agenda, um [16:06] again, we do have some folks on Zoom. [16:09] We've got Andy Flamm has joined us on [16:10] Zoom, so I would [16:12] recommend moving Bella Vista, this phase [16:14] of Bella Vista up. If there's any [16:16] concerns, we'll go with that. [16:19] Okay. [16:20] Um [16:22] So, the Bella Vista development is new [16:25] residential development uh located along [16:28] 400 East on the west side of 400 East as [16:32] the the [16:34] uh vacant ground between 400 East and [16:37] the Bella Vista, sorry, the Stratton [16:40] Metals development and previous [16:43] development that's along 200 East. [16:45] Um [snorts] [16:46] these are they've got four phases [16:49] um for [16:51] uh review today. Um we did review this [16:55] uh previously and this is a resubmittal [16:57] to address those those comments related [16:59] to this. [17:00] Um again, there's four phases related to [17:03] the overall development. [17:05] Um [17:06] One item that I will uh kind of [17:10] I guess on a uh [17:13] more [17:14] project-wide [17:16] uh [17:17] look at it. [17:18] Um, from our report one of our comments [17:21] that we did give last [17:23] uh, DRC was a comment about the [17:26] extension of 5 6 530 North and [17:30] connecting it all the way over to 400 [17:32] East. [17:33] Um, [17:35] that comment came they took the comment [17:37] and basically included that road [17:38] construction all within phase three. [17:42] Um, which I believe is something that the city supports on that because [17:47] it it does create some more east-west [17:49] connectivity through there. Gives [17:51] emergency access access out to there [17:53] with multiple connection points. [17:56] Um, however, with the way they propose [17:57] to do it is that does do a change of the [18:01] phasing plan that we have. [18:03] And so, um, [18:05] which is a DRC level approval that we [18:10] could do. We do have to just inform the [18:13] council and planning commission of any [18:15] changes that the DRC does approve. [18:18] However, with that being said, it it [18:20] does need to be included on a as an [18:22] actual action item on the the DRC. [18:26] And so, that wasn't done. [18:30] Um, [18:30] but as a as a part of that as we review [18:33] some of these, there's potential that we [18:34] can approve other phases [18:37] to allow that to continue move forward, [18:40] but the that change phase three and four [18:43] would need to [18:45] be um, [18:46] brought in as an action item by the DRC. [18:48] So, just [18:49] >> [snorts] [18:49] >> as a kind of note as we work our way [18:52] through these these four plats that that is the case and um, what we'd have [18:57] to do with that change the phase three [18:58] and four. [19:01] So, uh, with that [19:04] um, [19:06] again, the DRC is the overall final [19:08] approval for the final application. [19:10] So, we can do our motions accordingly [19:13] with that. [19:14] Uh so, with that introduction, we'll go [19:16] around with any comments that Again, [19:19] these are four different action items. [19:21] If there's specific items on each of the [19:22] phase that want to be discussed or [19:24] brought up, we're welcome to do that as [19:26] we as we discuss this this project. So, [19:30] Morgan. [19:31] >> Uh we have no no comments on the on any [19:33] of the phases. [19:34] >> Okay. [19:36] Randy. [19:37] >> I have submitted to you some redline [19:39] changes as far as addressing, but that [19:42] will be provided to you and there are [19:43] some on each of the plats. [19:45] >> Okay. [19:46] Sounds good. [19:48] Jason. [19:49] >> Just just a comment on the on the [19:52] phasing. I know we talked about it [19:53] yesterday as far as doing phase one and [19:56] phase four [19:57] so that we could finish 200 East, but I [20:01] don't know if that's something that can [20:02] be done or something that the contract [20:04] we can work with the contractor on. [20:06] >> So, it'd be a coordination with with how [20:10] they want to develop the project. We can [20:11] request and they don't They don't neces [20:15] Excuse me. They don't necessarily need [20:16] to do it in chronological like 1 2 3 4. [20:21] Um [20:21] things they do have to that we do have [20:23] to keep in mind is circulation, utility [20:25] circulation as well as traffic [20:27] circulation on how they phase those. [20:30] Um [20:31] >> Yeah, I I just know 400 East is in [20:33] pretty rough shape and we need to get in [20:35] there and do something with that. And it [20:37] would be good to do that at the same [20:38] time they were doing these phases and we [20:41] could get a lot of it knocked out if [20:43] phase one and phase four were kind of [20:45] done at the same time. [20:46] >> Yep. [20:47] >> But that's not [snorts] really up to us. [20:48] That's up to the contractor. [20:50] >> Right. And the developer on there. We [20:52] have They have included a note that they [20:54] do want to discuss that we [20:56] do recognize 4th East as a project and [20:59] that we're looking at uh working on that [21:02] road as well and would like to [21:03] coordinate that work to be done on [21:06] there. [21:06] >> Okay. [21:07] >> Um the developers were aware of the [21:09] applicants aware of it and we'll work [21:12] with the the applicant and the future [21:15] builder on this to to help [21:18] make sure that's done appropriately and [21:21] we can do it right. [21:22] >> Okay. So [21:23] >> And not have a whole bunch of road cuts [21:24] on [21:25] >> new road. Yeah, that's I don't want to [21:26] comment a new road and then have a whole [21:28] bunch of new road cuts in it. Just just [21:29] soon do the whole new road at one time. [21:31] >> Yep. [21:32] >> Okay. [21:33] >> So yeah, there's we I have had that [21:34] conversation with the applicant uh to [21:36] bring that up and and again if [21:39] well if it would work that they can do [21:41] phase one and four at the same time to minimize that then I think that's [21:45] something we can work through with. [21:47] >> Okay. That's you know other than some of [21:49] the other comments we can go through [21:51] that with the engineering comments. So [21:52] >> Yep. [21:53] >> Okay. Thank you. [21:54] >> Thanks Jason. [21:55] Mike. [21:55] >> Do you do you mind if I comment now or [21:57] do you want me to wait on that? [21:58] >> Go ahead Andy. [22:00] >> I was just going to say if if that's the [22:02] case [22:04] I think we could probably accommodate [22:05] that but it would make our change that [22:08] we just changed to phase three having [22:10] that road connect through. [22:12] We would probably want to uh [22:14] >> Go the other [22:14] >> do it the way we had it originally with [22:16] >> Correct. [22:17] >> that road [22:18] uh 400 East connecting through the south [22:20] side of the subdivision. [22:22] >> Yep. [22:23] >> So just something to be aware of. [22:25] >> Okay. [22:26] >> Do you know timing on that Andy? Do you [22:29] know what your timing is? [22:31] >> I don't. We're working with the buyer [22:32] that we'd probably start I know they had [22:35] planned on doing phase as one and two [22:37] simultaneously this winter. [22:40] Um [22:41] that I I don't want to speak on their [22:42] behalf but that was their plan. I think [22:44] they could I could talk to them today [22:46] and get an answer for you on maybe doing [22:48] one and four at the same time instead. [22:51] And I think that probably would [22:52] that would be fine. [22:54] As long as I haven't looked at the [22:57] uh sewer and everything to make sure [22:59] that it would would work with our [23:00] current design but [23:02] if it does I don't think it'd be a [23:03] problem. [23:04] >> I think the sewer would [23:07] may have a little bit impact. But I [23:10] think that roadway within phase four [23:12] does connect straight up here to phase [23:16] one and flows north. It's within [23:19] the the eastern side of Sorry, the [23:21] western side of that where our sewer [23:23] lines uh [23:25] kind of jog around a little bit. [23:33] Uh phase four [23:35] sewer all just heads directly north. [23:38] >> Okay, yeah, if that's not an engineering [23:40] issue, then I'll talk to him. I don't I [23:41] don't think that'll be a problem. [23:44] >> Yeah. [23:45] So, it just Yeah, just extends down here [23:47] to do is that. Again, phasing-wise, [23:50] um [23:51] the the biggest thing would be [23:53] connectivity on on that. So, [23:57] um [23:58] cuz that would adjust where this roadway [24:00] stubs out now versus Correct, yeah. [24:04] is where that would kick in. Now, it is [24:06] possible that that it doesn't [24:08] necessarily need to be included that [24:10] roadway [24:12] Yeah, dedication of that roadway would [24:13] have to work on a little bit there, too. [24:15] So. [24:17] >> Yeah, um I'll I can let you know later [24:20] today. I know that's not conducive to [24:21] making a motion today, but um [24:24] I think there's some flexibility there [24:26] to accommodate that request. So, I'll [24:28] just be mindful of that, I guess. [24:29] [snorts] [24:31] » Okay. [24:32] >> Sorry to interrupt. Thank you. [24:34] >> No, thanks, Andy. Appreciate it. [24:37] Mike. [24:38] >> Um [24:40] I wasn't able to make it to the meeting [24:41] yesterday, but did we decide on fencing [24:43] Morgan what that needed to be on the [24:45] >> So, they do have a note there for the [24:48] construction of a of a fence along 400 [24:50] East along the back of those those [24:52] properties. [24:53] >> Okay. [24:54] >> So, that all front along 400 East. So, [24:56] the double frontage along 4th East. [24:58] >> Okay. [24:59] And then, also just to like he said, if [25:01] they're going to do one and four, [25:03] obviously it makes sense not to push [25:04] that road through cuz those other homes [25:07] wouldn't be in yet, so. [25:08] >> Yep. [25:09] >> Um but other than that, no. I've got [25:11] nothing. [25:12] >> Okay. [25:13] Norm? [25:15] >> Yeah, just a a note on phase one. And I [25:19] think And you're probably aware of this, [25:21] but we've had I have had some discussion [25:24] with the school district recently about [25:26] that [25:27] parcel number 29042 [25:30] 0020, which is just kind of the [25:32] connection that we need for Royal Land [25:34] Drive to 400 East. They're working on [25:36] that right now and and uh [25:39] hopefully we can get that they can get [25:41] that done and we can build that road all [25:42] the way through there. That would be [25:43] really really good. [25:45] >> [snorts] [25:47] >> Yeah, that would be great. I've been [25:47] helping facilitate that with our dream, [25:50] the school district, the appraisers. Um [25:53] so, if that changes, we would just not [25:55] need to abandon the turnaround design [25:57] and punch that road through. [25:58] >> Yeah, that would be great. We we'd [25:59] obviously need design on that and then [26:02] an adjustment to the plat, but I think [26:04] that's something we could obviously very [26:06] well accommodate to be able to get that [26:07] road through there. [26:10] >> All right, sounds good. [26:14] » Okay. [26:15] Um [26:18] let's see. There's really not a whole [26:19] lot of additional comments, mostly just [26:22] on these [26:23] on the the phases. [26:25] Um some of addressing and and where uh [26:29] where it would be anticipated driveways [26:31] would be. So, this is 770 [26:35] uh north, which is basically between [26:38] this one, Royal Land Drive. There'll be [26:41] a few [26:43] kind of major roadways I think that'll [26:44] be heading east-west and connecting uh [26:47] with this with this with these phases [26:50] going in, especially phase one. [26:52] Um there's really only one other [26:55] road on the south end at 530 south, 530 [26:58] north that we'd be dealing with. [27:01] But um to help it would be [27:04] to help traffic flow through there and [27:06] not have people backing out on the road. [27:08] Um [27:09] and to I guess minimize that as much as [27:11] we can, some of these corner lots would [27:13] be requested those would just front on [27:15] to the side streets versus on the 770. [27:19] Um we do have addressing on there, but [27:21] um [27:22] so we can that would need to be adjusted [27:23] and done on there for for those. [27:26] As it goes out uh to help traffic flow. [27:31] Um I believe that was [27:36] those were the main comments we had. [27:39] Those that comment kind of again holds [27:41] true for [27:42] um some of these lots down here further to the south. [27:47] >> John, [27:49] is this showing the existing [27:53] » It does, yeah. [27:56] >> It looked like it [27:58] they're asking for a new line. [28:01] >> Yeah, cuz this uh that's one. [28:04] That's correct. Yes, thank you for that. [28:06] So this line here was installed [28:09] oh [28:11] when did we build in Stratton Meadows or [28:13] Stratton Acres? [28:14] >> Oh man. [28:15] >> Oh, four years ago in that two two or [28:17] three years ago. [28:18] Um that line was installed from 200 east [28:21] all the way down and there's a fire line [28:23] that does extend up here to the the [28:25] school district's animal lab. So that is [28:27] an existing pipeline that would not need [28:30] to be installed uh with this development. [28:37] » Thanks, Keith. [28:41] » Yeah, I believe [28:43] >> John, what what are those what's that [28:44] comment right there? Don't we have some [28:45] comments on the Yeah, the storm tech [28:47] stuff? [28:48] >> So, this is [28:50] This comment's in specific to the [28:53] protection of [28:55] the proposed storm drain lines that or [28:57] storm drain infiltration galleries, [29:00] which are located throughout the [29:01] development. Um [29:04] one of the comments that was given [29:05] previously was how are these [29:08] infiltration galleries going to be [29:10] protected [29:11] uh after installation and during [29:13] construction of the homes um [29:16] and afterwards. Um they did provide a [29:19] detail [29:22] on that. It was right here. [29:25] Um basically the [29:27] thought was to burm up over the top of [29:29] those [29:30] um prior to and that's [29:33] and this would be um [29:36] either with the [29:39] um after the before the side sidewalk [29:42] and road base were installed over that [29:44] to help protect it. Um [29:48] the There are some that would protect [29:50] it, prevent people from driving over it, [29:52] but when you go to start building [29:55] homes and sidewalks are in, etc., that's [29:58] when we've seen those our tanks be [30:00] damaged during that construction period. [30:03] And so, I guess the request on here is [30:06] just to you know, kind of flesh that [30:08] out, provide more of a narrative on the [30:10] proposed protection of those our tanks. [30:14] Um [30:15] one recommendation is that there could [30:17] be a different uh infiltration system be [30:21] done versus an our tank. [30:23] Um [30:24] that would [30:26] more resist a a load or a concrete truck [30:29] from collapsing those those infiltration [30:32] galleries. [30:33] >> Yeah, Andy, we've had [30:36] >> a lot of people that have designed with [30:37] these our tanks and at the end of the [30:39] day, the contractors [30:41] can't protect them, they get broken, [30:43] etc. and they move to other methods. [30:45] That's what John's talking about. We [30:47] would encourage you to look at maybe a [30:48] StormTech that are already structural [30:50] and you don't have to build the [30:51] structure up around the tanks and that [30:53] kind of stuff. [30:54] Due to cost and constructability and [30:56] longevity, those ART tanks are just not [30:58] working out well for the city or for the [31:01] contractors. [31:03] >> Yeah, we'll uh look at some alternatives [31:05] and provide some. [31:07] >> As as a note, that uh while an ART tank [31:10] may be shown on your plans and such, it [31:13] is possible to request um [31:16] you know, if you do land on a different [31:19] system to do that, um [31:21] you can coordinate with engineering on [31:23] that to modify or uh adjust those. [31:27] >> Okay. [31:28] >> After uh [31:28] >> And you prefer StormTech uh StormTech, [31:30] you said? [31:30] >> We have seen those those have been [31:32] successful in the past for us [31:35] um on those. [31:35] >> Okay. [31:37] >> Didn't they use those in the They used [31:39] that in the first [31:40] development, right? Over there? Yes. [31:43] The other phases within Stratton Meadows [31:44] and Stratton Acres, I think. [31:46] >> Again, with a change in the middle of [31:48] the process because they were just [31:50] struggling with the ART tanks and the [31:51] cost and the constructability and stuff. [31:54] So, yeah, that's [31:55] kind of why we're leading towards that. [31:57] >> Yep. [31:58] Uh okay. Yeah, that's fine. [32:01] » Okay, I believe that was I think with [32:05] phase one. Phase two, there weren't any [32:08] additional comments. [32:11] Um [32:15] I'll try to run through these real [32:16] quick. [32:19] Don't believe there's any additional [32:20] comments on phase two. [32:26] Phase three. [32:40] » I don't believe there's any additional [32:41] comments there either. [32:47] Then phase four [32:50] uh again just the comment about [32:52] addressing there and on those those two. [32:55] So [32:56] >> So John, I have a question on the the I [32:58] just saw you run across the sewer [33:01] easements that are going to be [33:02] eliminated, but also [33:05] doesn't doesn't if phase one and four or [33:07] at least phase four if that's [33:10] constructed first, don't they need [33:11] offsite sewer to be able to handle? [33:13] >> Again, phase phase three is where [33:18] those that realignment of that pipeline [33:21] of the sewer line, that's when that kicks in to be done. [33:25] >> But but phase four standing on its own, [33:27] there's no connectivity to utilities or [33:29] sewer or anything of that nature. [33:31] >> So within to phase one, there would be [33:34] >> If phase one is constructed before phase [33:36] four, yes. [33:37] >> That's correct. [33:38] >> But if it's not, then you have [33:40] So just need to be mindful of that Andy [33:42] as well to make sure that that [33:44] as the phasing goes along, it doesn't [33:47] necessarily have to phase one, two, [33:48] three, and four, but if you don't, then [33:50] there's other ramifications that [33:52] potentially could be there that might be [33:54] an issue. [33:55] >> Yes. [33:56] >> Yeah. Yeah, understood. [34:01] » Okay. [34:03] Um [34:04] I believe that's it. [34:05] >> Is there any other comments, thoughts [34:08] on these phases? [34:15] If not, I would would look for a motion. [34:19] >> Do we need motion for each one [34:21] separately? [34:22] >> We would need a motion for each one [34:23] separately, yes. [34:26] >> Can you go back to the agenda, John? [34:28] Please. [34:31] So the the the three and four because of [34:34] the potential change and the unknown [34:35] nature of where we're going to do that [34:37] road and the phasing and all that kind [34:38] of stuff, [34:40] how does that that if if if we change [34:43] the road either direction where 530 [34:45] north or whatever it is gets punched [34:47] through all the way from 4th East to 200 [34:49] East or whether whether it's four or [34:52] three, [34:53] that that necessitates a minor change [34:55] that would have to come back to the DRC, [34:57] correct? On these three and four. [34:59] >> For three and four. One and two, there's [35:00] no changes on the approved phasing plan [35:03] uh [35:04] from what's been approved. And so, phase [35:07] one and two [35:08] could be but could be approved or um [35:11] receive final approval. Phase three and [35:13] four because of that unknown there would [35:15] probably need to be tabled. But, we [35:17] could do one and two without any could [35:19] >> To then come back for that minor change. [35:21] >> That's correct. [35:22] >> For whichever minor change it is, right? [35:24] One way or the other. [35:25] >> Well, if they don't punch the road [35:27] through, then there wouldn't be any need [35:29] to change that to have that be a DRC [35:32] action item for the city. [35:33] >> really there's really two aspects to [35:35] this three and four. One is if three is [35:37] done the way that it's currently [35:39] submitted, it would need a minor change [35:41] and it would provide connectivity for [35:43] the city, for the residents to get all [35:45] the way through from 200 to to 400 East. [35:48] >> Yes, and also during construction as [35:50] well. [35:50] >> But, phase four and phase one are [35:52] beneficial to be able to pave and and [35:55] have us [35:56] be able to have a completed road out on [35:57] 400 East. So, there's a there's a given [36:00] take there. So, um [36:02] maybe [snorts] maybe we as staff need to [36:03] figure out a a [36:05] recommended path [36:07] to to try and figure that out and and [36:10] give that back to Andy and his team to [36:12] try and [36:13] uh I I again, I in my estimation just [36:17] the the short time that I've had to [36:18] think about it, I think that that's the [36:20] 530 north would be better to punch that [36:22] through and then when phase four comes [36:24] along, we deal with 400 East. [36:27] But, that would be my my estimation. It [36:29] would be nice to have both, but you're [36:31] not going to get both at the same time, [36:33] I don't think. [36:34] >> Correct. [36:35] >> So I make a motion to conditionally [36:37] approve plat A, sorry, Apple Hollow, [36:40] sorry, Bella Vista [36:42] phase one final [36:44] with conditions that redlines are [36:46] addressed. [36:47] >> Okay. [36:48] Got a motion. Is there a second? [36:49] >> Second. [36:50] by Randy. [36:52] Any discussion? [36:55] All in favor, please say I. [36:56] >> I. [36:57] >> Any opposed? Okay, motion passes. [36:59] >> So So Andy, I want to make sure that [37:01] you're clear on that. Conditional means [37:03] that you got to meet the conditions. [37:04] It's not finally approved. You got to [37:06] meet the conditions, but we feel like [37:08] it's [37:08] >> Yeah, I get it. We got to address all [37:09] the redlines, resubmit. [37:10] >> It's close, but you're not there yet. So [37:12] I make it the same motion on Bella Vista [37:14] phase two [37:16] for final approval conditional with [37:18] redlines being addressed. [37:19] >> Okay. [37:20] Is there a second? [37:22] >> Second. [37:23] by Randy. [37:25] Any discussion? [37:27] All in favor, please say I. [37:29] >> I. [37:30] >> Motion passes. [37:32] >> Make a motion to table Bella Vista phase [37:34] three final to come back for that minor [37:37] change. [37:38] >> Okay. [37:39] Is there a second? [37:40] >> Second. [37:40] by Randy. [37:42] All in favor, [37:43] please say I. [37:44] >> I. [37:45] >> Any opposed? [37:47] Okay. [37:48] >> Same motion for Bella Vista phase four. [37:51] >> Okay. [37:51] >> Second. [37:52] by Randy. [37:54] All in favor, please say I. [37:56] >> I. [37:57] >> Any opposed? [37:58] Okay, motion passes. [38:00] So [38:01] We'll get these Andy and I'll I'll reach [38:03] out to Andy and we can talk through [38:05] that. So [38:06] >> Yeah, sounds good. Thank you, everyone. [38:08] >> Thank you. [38:11] Okay, the last item on the agenda is a [38:15] site plan review of proposed [snorts] [38:19] uh [38:20] retail site. This is located on Main [38:24] Street on the northeast corner of Main [38:27] Street and 300 West. [38:29] Um [38:31] If you recall, there was an old home, a [38:34] couple of homes that had been [38:35] constructed on this this parcel [38:38] that have been demolished. Um they did [38:41] receive a demolition permit for for that [38:44] work and it was completed accordance [38:46] with with city code. [38:49] Um so with that, they are proposing a [38:52] basically an overall six-unit commercial [38:55] site with five individual [38:59] kind of [39:00] retail sites on retail [39:04] units on the north side of the [39:06] development with the smaller proposed [39:08] building on the the southern half of the lot. [39:13] Um [39:14] This again, this is a site plan [39:16] application. It is reviewed and DRC is [39:19] the final approval body for this [39:22] application. [39:23] So with that, we'll go around the DRC [39:25] [snorts] with any thoughts or comments. [39:27] >> Start with Morgan. [39:28] >> Great, thank you, Chair. [39:29] Um so [39:31] starting really with kind of the cover [39:33] sheet, they indicate that 35 spaces are [39:36] provided. We've counted several times, [39:38] we keep coming to 33, so they'll need to [39:40] change that now. Um and then they [39:44] indicate that only 32 are required. Um [39:49] 33 are required unless they provide us a [39:51] table that breaks down the square [39:53] footage of the buildings a little bit [39:54] more in the past. Um we have deducted [39:57] bathroom [39:58] >> Morgan, can you speak in the microphone [39:59] right here? [40:00] >> Yeah, sure. [40:01] Um so it in a [40:03] We'll need a breakdown of the square [40:05] footage if they want it to go for some [40:06] sort of [40:08] reduction in the square footage that's a [40:10] part of that calculation, but right now [40:12] 33 spaces are are required. [40:16] >> 33 or 35? [40:17] >> Um 33 spaces are required. [40:19] >> Okay. They listed 35 are provided. [40:23] >> Oh, got you. Okay. [40:24] >> 33 are provided. So, they're right at [40:26] the number. [40:27] >> Understood. [40:28] >> Yep. [40:29] Um the street side setback needs to be [40:32] 10 ft. They're very close. So, most [40:34] likely they'd have to shrink the [40:35] building a little bit, but they would [40:37] need to [40:37] uh meet the minimum 10 ft. [40:40] Um uh queuing for the drive-throughs is [40:45] 80 ft and that's measured from the [40:46] drive-through window to the beginning of [40:49] the queuing lane. [40:51] Um so, those do look like they're short. [40:53] They'll need to provide that dimension [40:56] from the drive-through window to the [40:57] beginning of the queuing lane to to show [40:59] that they meet the full 80 ft. And then [41:02] something of note um [41:05] it looks like most likely they're going [41:06] to have to adjust their site [41:09] um [41:09] at some level. When they if they do um [41:14] the queuing like so the stacking area of [41:16] the drive-through cannot be between the [41:19] building and the front property line. [41:21] And so, they they don't show that now. [41:23] They just show the exiting portion of [41:25] the lane. They don't show the queuing [41:26] portion of the lane. But when they do um [41:29] make those modifications just for the applicant is aware do not put the [41:33] queuing um [41:35] or the you know, the stacking [41:37] portion of the lane in the front [41:39] setback. That's that's essentially what [41:40] it's calling out. [41:42] Um I believe Oh, um on the cover sheet [41:45] as well, there are several mentions of [41:47] Orem that'll need to be changed to [41:50] Santaquin. [41:52] >> Thank you. [41:52] >> Yep. [41:53] >> You. [41:54] >> So, Morgan, I have a question on the [41:55] parking. [41:56] Um building use [41:58] tenant use could determine or could [42:01] require more parking depending on what [42:03] they put in there, the square footage, [42:05] the use, that kind of thing. So, I just [42:06] want to caution the applicant to make [42:08] sure that they have they don't build too [42:10] much building and don't have enough [42:11] parking for X Y Z use that they may have [42:14] tried to put in there at some point in [42:15] the future. So [42:16] >> Yeah, that that's a great point. [42:18] >> That that has been something that we've [42:19] dealt with in Santaquin before where [42:21] they're really tight on the parking and [42:22] then all of a sudden they don't have [42:23] enough because they want to bring in a [42:25] use that requires more parking. So I [42:27] would just caution on that. [42:28] >> That's a great point. We're using right [42:29] now just so that the applicant knows [42:30] that just the general retail only use [42:32] category. So if they put office or [42:34] medical in in one of those then that could change the [42:38] that the parking requirement. [42:40] >> But it sounds like this parking's going [42:41] to have to be rearranged anyway to meet [42:43] those stacking requirements for the [42:46] drive-throughs, correct? [42:47] >> Yeah, most likely. They they'd have to [42:49] do some modifications to the site. [42:54] » Okay. [42:55] Randy? [42:56] >> Uh nothing at this point. [42:57] >> Okay. [42:58] Jason? [43:00] >> I didn't see a PI meter. [43:02] on the plans and [43:04] there is one that's actually on 300 [43:06] West. I That's just a general location. [43:09] We can provide that location to them. We [43:11] should have a shot on this. [43:12] >> Yep. [43:13] >> But it is it is there. That's and it's a [43:15] 1-in service. So [43:17] >> More than adequate to serve the [43:19] landscaping on the site. [43:21] >> Yep. And [43:22] the other thing, I think there's a [43:24] discussion about the master, you know, [43:26] maybe changing from a [43:29] uh individual meters to a master meter. [43:31] I don't know if we can do that in a in a [43:35] commercial space. [43:37] >> And say I think there's a couple options [43:39] we could do. One master meter that [43:41] probably be ideal. But there isn't [43:43] necessarily commercial wise within our [43:45] standards or code that requires that [43:47] commercial site [43:49] have a master meter. Uh for residential, [43:53] uh for anything over three units or more does require a [43:57] master meter. But commercial wise, we [44:00] don't have that requirement. [44:02] However, with that said, I believe [44:04] there's a a a more economical pathways [44:07] forward for how they would stub uh [44:10] into this, you know, [44:11] single 6-in line coming off of the the [44:14] main and stubbing it in, and then [44:16] putting a manifold with different meters [44:18] off of that, um or putting a master [44:21] meter in, etc. There's a couple [44:23] different options that we can work with [44:25] the applicant on to address that to make [44:27] it so we don't have a string of [44:30] 1-in meters all spaced a foot apart on [44:33] it off of the [44:35] >> [clears throat] [44:35] >> a main line. Cuz there are some [44:37] uh concerns by tapping into the main [44:39] line that close to each other on there. [44:43] >> And it's just a lot of 1-in lines [44:45] running across the road, and you could [44:46] do it with with one. [44:48] >> And uh [44:49] longevity-wise for the city, and also I [44:52] believe for the site it'd be beneficial [44:54] to do that. And a lot less excavation [44:57] work to to put a single line in versus [45:00] uh [45:01] a whole bunch more. [45:02] >> Yeah, one saddle instead of five. [45:04] There's a Yeah. [45:05] >> Yeah. [45:07] >> And then, yeah, that's that's about all [45:09] my comments. [45:10] >> Okay. [45:11] >> Mike? [45:13] >> Just a couple of uh [45:14] just a reminder that road coming on 300 [45:17] West is one-way. It would be nice to [45:18] have a right-turn-only sign exiting that [45:21] north [45:23] exit. [45:24] >> Mhm. [45:25] >> So that we don't have a whole bunch of [45:27] traffic trying to come southbound on 300 [45:30] West. [45:31] Um also on the landscape plan it does [45:34] show there's a pretty large tree right [45:36] there close to that exit, which is going [45:38] to mess with the site uh exiting that. [45:42] This [45:43] the site line. [45:46] So I would like to see that tree not be [45:48] there. [45:50] >> And the And the one on Main Street? [45:53] >> There Yeah, there's a few that are in [45:55] the site triangle [45:56] >> kind of a little bit farther away, so I [45:57] don't I would like to see a site [45:59] triangle on both those entrances and [46:00] exits. so [46:03] >> Yes. [46:04] I'm trying to see where that went. [46:09] site lighting [46:12] There it is. [46:14] That's irrigation. [46:21] Yes, but there were a few trees that [46:22] were located [46:26] Oh, right there. [46:28] Yeah, so there's this tree here, this [46:30] one here, [46:31] um and down on this corner. [46:35] >> I don't know that I worry as much about [46:37] the one down on 3rd West on that round [46:39] cuz it is a one-way street, so nobody [46:41] should be turning left out of there. [46:44] >> Mhm. [46:44] >> In theory. They do, but in theory they [46:46] shouldn't be. [46:47] Self-correcting, I guess. [46:52] » So, on that they are going to be uh this [46:55] roadway [46:57] uh with the they are going to line up [46:58] with the existing curb, gutter, and [47:00] sidewalk further to the north that were [47:03] uh installed with Evergreen Townhomes [47:06] development. So, this roadway will be [47:08] wider than it is currently because they [47:10] will tie into that and and improve the [47:12] whole frontage along that along 300 [47:15] West. [47:16] So, it does extend the width of that [47:18] road. [47:18] >> But, it still will only be one-way, [47:20] correct? We're not changing that. [47:21] >> that is the current [47:22] >> as I know, anyway. [47:23] >> That's I say that's a higher discussion [47:25] what the DRC has at this point. So, [47:27] >> That's what I'm saying. If it is going [47:29] to stay one-way, I would like to see a [47:30] right turn sign put in cuz as people [47:32] come to shop or whatever, this is going [47:34] to be [47:35] I don't really want them exiting going [47:36] the wrong way. [47:37] >> We would need to do something similar to [47:39] what the townhomes that are across the [47:40] street where we'd have to install a sign [47:42] that indicates right turn only. [47:44] >> Yes. [47:45] >> And [47:46] left Yeah. [47:47] >> And for right turn [47:48] >> left and right turn only signs, make [47:50] sure you get it handed the right way, [47:51] so. [47:52] >> But, in the future if we widen this [47:54] road, could we move the one-way down to [47:57] >> That is a potential. [47:58] >> 100 North. [47:58] >> That would be a discussion that would [47:59] need to be held with the city council. [48:01] >> Okay. [48:01] >> On that. [48:02] >> I mean [48:03] >> [clears throat] [48:05] >> Yeah. [48:06] There's a lot of There's a lot of people [48:08] live right there, so [48:09] >> Yes, there is. [48:12] » Okay. Anything else, Mike? [48:14] >> No, thank you. [48:15] >> Okay. [48:16] Norm? [48:17] >> Just what I've already talked about with [48:20] not building too much building and not [48:21] having a parking, but also I would also [48:23] recommend that they might want to look [48:25] at just bringing a fire line over a 6-in [48:27] or an 8-in from 300 West to service, [48:30] like we've talked about with one master [48:32] meter, they break down a manifold after [48:34] a connection to a main line, and that [48:36] way if they ever do decide to put [48:38] something in there as far as a [48:40] you know, some type of a of a [48:44] facility that needs to have sprinklers, [48:46] then they have a line already in there. [48:47] We don't have to go dig up the road. So, [48:49] that might be something to consider as [48:51] part of that discussion with the water [48:54] service to the buildings. I know right [48:56] now they're saying it's not going to be [48:58] required, and that's fine as long as it [49:00] stays retail, but if they get to some [49:02] you know, use again that hasn't been [49:04] identified that they want to put in [49:05] there and they need a fire line, then [49:07] they're going to go cut up the road, so [49:09] >> Correct. [49:09] >> I think it'd be a beneficial to have [49:11] that be part of our discussion. [49:13] >> Yes. [49:13] >> And then just you know, I still There's [49:16] still a lot of work to be done with [49:17] this, but I think it's it's looking [49:19] good, so [49:22] » Okay. [49:23] Um [49:24] I'll just kind of see if I can um [49:27] say Morgan's already covered that, the [49:28] parking related to those. [49:31] Um [49:33] >> [clears throat] [49:34] >> One other item that needs to be kind of [49:37] discussed and gone through is that [49:40] coordination will be needed with UDOT [49:42] for the existing driver approaches that are currently to the site. There's [49:47] two of them that extend onto [49:51] uh old parcel [49:53] um [49:54] from Main Street. [49:55] Um because it's my understanding that [49:58] due to the change of use for the site, [50:01] um UDOT is going to require [50:04] uh adjustments to access on here. And so [50:07] they do need to coordinate with UDOT on [50:09] those drive approaches to to be in [50:11] conformance with UDOT's requirements. [50:16] Um so I think we've already covered most [50:19] of those comments there. One thing that [50:22] I will point out that hasn't necessarily [50:23] been discussed is the the access [50:27] width um as currently shown is 24 ft [50:30] wide. [50:31] Fire code does require those to be 26 [50:34] uh for this. [50:36] Um and that is specifically for the [50:39] eastern road as you get north of the the [50:42] proposed building and the northern [50:44] access that goes out to 300 West. Uh [50:47] those do need to be 26-ft wide in in [50:50] width. [50:56] Uh I've talked queuing. I've talked [50:59] about that one. [51:02] Going the wrong way. [51:03] Um [51:06] The other item is um is location of the [51:10] sewer laterals. There does need to be a [51:12] maintain a minimum of 10-ft separation. [51:14] That's horizontal separation between the [51:17] sewer lateral and the water lines. [51:25] Again, that's these measurements here [51:27] are just to show the the designed width [51:30] of the of the new asphalt. That's from [51:33] lip of lip of gutter lip of gutter. So [51:35] it does widen [51:37] uh that roadway considerably as you go [51:39] down through here. [51:41] There are some additional comments on [51:43] the storm drain report that need to be [51:44] addressed as well and those will be [51:45] provided with these red lines. [51:51] I believe that [51:54] Oh, there's the comments on the trees. [51:57] Finally found it. [52:01] And we've already got that, the table [52:03] for the live plant materials. [52:07] I believe that's it. [52:08] >> And then John, I did This is Morgan. [52:12] I didn't mention in my parking comments [52:14] the length of the stalls in the center [52:17] of the site, so the ones that aren't [52:18] overlapping landscaping are required to [52:22] maintain a minimum length of 20 ft. [52:24] They're showing at 18 ft. So if they [52:26] overlap landscaping like the boundary [52:27] ones, then they can go to 18 ft. [52:31] So that that would add another 4 ft [52:33] overall for the center stalls. [52:35] >> [snorts] [52:35] >> So yeah, so that's these ones along the building here. That's a 10-ft [52:39] separation from the building to the [52:41] parking stall and as well up here. [52:44] There's enough landscaping that this [52:46] these one the southern parking stalls [52:50] and the northern parking stalls can [52:51] remain as they are. However, there is [52:54] still 4 ft additional [52:57] uh depth that needs to be provided for [52:58] these parking stalls in the middle. [53:01] >> And John, did you talk about the 26 [53:03] versus 24 ft? [53:05] >> I did, yes. [53:05] >> With Okay. Is that face-to-face on the [53:08] curbs? [53:09] >> It would be face-to-face on the curbs. [53:12] Um one other another item on there is [53:15] just for the proposal or the shown cross [53:17] connection. [53:19] Uh an agreement would be needed between [53:21] the two properties to permit that allow [53:25] for that uh connection. It does improve [53:28] circulation quite a bit. It would also [53:30] allow a um a Main Street [53:35] access for the new site to be able to [53:38] access on the Main Street. Granted, it [53:40] is further to the east, but [53:42] um [53:43] so there are benefits to be able to do [53:44] that, [53:45] but it would require that cross [53:47] connection agreement. [53:52] Okay, any other comments or thoughts? [53:55] >> I have a question. [53:57] >> Sure. [53:58] >> Uh the radius on Main Street [54:02] that we're going to tie into [54:04] it's narrower there than it's going to [54:06] tie into the north. Would that affect [54:08] your two-way [54:10] traffic? [54:11] >> With 45 ft of asphalt, uh it wouldn't. [54:14] >> Well, there is 45 [54:15] >> There's 45 of the throat, yeah. [54:17] >> is not on the property. [54:19] Is that [54:24] » Is that not sure the [54:27] We say it's not on the property line? [54:29] >> I don't know what you're meaning by [54:31] that. The dark line is the property [54:32] line. [54:33] >> Correct, yes. [54:34] >> So, on that radius, [54:36] >> So, they would be tying into the [54:38] existing that's there. And that's a [54:39] 40-ft wide throat. [54:41] >> Yeah, John, the the the Main Street [54:43] project took us around the PC or PT on [54:46] that curve, right? So, it's it's got its [54:48] starting point already, and they would [54:49] not be redoing the curve [54:52] for what we already do with Main Street. [54:53] It would just go straight between the [54:55] two, and if I remember correctly, [54:56] hopefully we got it and [54:58] right. [54:59] >> [cough] [55:00] [clears throat] [55:01] >> Yes. So, it does it does as you do go [55:04] from south to north, it does widen a [55:06] little bit, but that's because again, [55:08] this has been installed uh that was [55:12] installed with the Main Street widening. [55:14] That's correct, yes. [55:17] but yes, we did do that. It is the [55:20] 40-ft wide through there. [55:24] Thank you. [55:27] Okay, any other thoughts or comments? [55:31] Seeing none, I say look for a motion on [55:33] the on the site plan application. [55:36] >> There's still a lot to be done here, so [55:37] I would make a motion to table them. [55:39] >> Okay. [55:40] Motion to table. [55:41] >> I'll second. [55:42] >> Second by Mike. [55:44] Any discussion on the motion? [55:47] All in favor, please say I. [55:49] >> I. [55:49] >> Any opposed? [55:51] Okay. The most The application is [55:53] tabled. [clears throat] So. [55:55] Okay. [55:57] Um the next item on the agenda is the [55:59] meeting minutes from the August 11th DRC [56:03] meeting. [56:04] Sorry. Any comments on there? Look for a [56:06] motion. [56:09] » I motion to approve the August 11th, [56:11] 2026 [56:13] meeting minutes. [56:15] >> I'll second it. [56:16] >> Second by Jason. [56:18] All in favor, please say I. [56:20] >> I. [56:21] >> Any opposed? [56:23] Okay. [56:24] Um those minutes are approved. And if [56:26] there's not anything else needs to be [56:27] brought for the DRC, I'll look for a [56:29] motion to adjourn. [56:29] >> So moved. [56:31] >> Okay. We are adjourned at 10: