1 00:00:51,250 --> 00:00:51,770 Well, 2 00:04:53,730 --> 00:04:59,270 welcome to smart regular meeting, regular board of directors. 3 00:05:00,000 --> 00:05:12,680 Members meeting for August 19th, 2026. Welcome everyone. I just have to say I like the more the closer 4 00:05:12,680 --> 00:05:20,980 set up of the room, making better use of the room. And we should do it like this all the time. 5 00:05:21,560 --> 00:05:23,980 And the barn door is nice also. 6 00:05:24,620 --> 00:05:25,120 Yeah. 7 00:05:29,940 --> 00:05:33,920 This is what happens when you leave the barn door open. 8 00:05:35,720 --> 00:05:36,480 All right. 9 00:05:36,960 --> 00:05:40,840 Tyrene, we're going to start with a roll call. 10 00:05:41,320 --> 00:05:42,240 Thank you, Chair. 11 00:05:43,180 --> 00:05:44,280 Director Catertomson. 12 00:05:44,700 --> 00:05:44,860 Here. 13 00:05:45,720 --> 00:05:46,300 Director Colin. 14 00:05:46,300 --> 00:05:53,800 President, Director Fleming, Director Garboreno, Director Jacobs, Absent, Director Kelly, 15 00:05:56,500 --> 00:05:57,820 Absent, Director Luke, 16 00:05:58,440 --> 00:06:09,440 Bergen, Director Par, Director Paulson, Director Rabbit, Director Vice Chair Sackett, Chair Corsi, 17 00:06:10,520 --> 00:06:12,020 and can I go back to Director Kelly. 18 00:06:12,020 --> 00:06:13,760 Thank you. 19 00:06:15,780 --> 00:06:16,560 All right. 20 00:06:16,740 --> 00:06:19,780 Item number two is approval of the July 15th minutes. 21 00:06:20,600 --> 00:06:25,400 Any questions or comments from board members on the minutes from last month? 22 00:06:27,740 --> 00:06:33,540 Not seeing anyone will look for a motion to approve. 23 00:06:33,860 --> 00:06:35,200 Make a motion. 24 00:06:36,160 --> 00:06:37,380 And we have public comment. 25 00:06:38,000 --> 00:06:39,560 Public comment on the minutes. 26 00:06:39,640 --> 00:06:41,620 Anyone else have comments on the minutes? 27 00:06:41,620 --> 00:06:45,860 Anyone online have comments on the minutes of July 15th. 28 00:06:48,250 --> 00:06:51,590 Thank you. We have a motion. Can we get a second. 29 00:06:52,650 --> 00:07:00,710 Second. All right. All in favor. See, I, I, I, any opposed. Stentions. 30 00:07:01,610 --> 00:07:06,130 All right. That, that causes you to anonymously. Did you have an abstention? 31 00:07:06,130 --> 00:07:08,070 Yeah. Oh, I'm sorry. 32 00:07:08,790 --> 00:07:11,230 Director's Fleming, Gavrino, and 33 00:07:11,230 --> 00:07:11,730 Awesome. 34 00:07:20,620 --> 00:07:23,080 We'll take a minute for any board member announcements. 35 00:07:23,760 --> 00:07:26,160 Anyone have anything to share 36 00:07:26,160 --> 00:07:28,600 to share with the board in the public? 37 00:07:29,740 --> 00:07:30,780 I just came from 38 00:07:31,420 --> 00:07:32,880 as some sort of educational 39 00:07:33,420 --> 00:07:35,240 on how to put screws into some 40 00:07:35,240 --> 00:07:37,360 on spine at marine general function. 41 00:07:37,940 --> 00:07:39,680 And the table, the light-hearted table 42 00:07:39,680 --> 00:07:41,720 conversation was how much everyone 43 00:07:41,720 --> 00:07:43,780 really enjoyed writing the train. 44 00:07:43,780 --> 00:07:49,040 And so that was lighthearted while you were avoiding this stuff on the screen. 45 00:07:50,400 --> 00:07:50,920 Good. 46 00:07:51,420 --> 00:07:52,900 Nice to be a good diversion. 47 00:07:54,840 --> 00:07:55,840 Director Keter Thompson. 48 00:07:55,920 --> 00:07:58,040 This morning I was out on Highway 37. 49 00:07:58,940 --> 00:08:03,040 Just supporting starting to move forward with work on Highway 37. 50 00:08:03,920 --> 00:08:04,960 So it's exciting. 51 00:08:05,940 --> 00:08:07,940 Especially if you take that route a lot, which I do. 52 00:08:12,070 --> 00:08:12,730 Director Kelly. 53 00:08:12,730 --> 00:08:20,370 Last month, I had the opportunity as the chair of the STEM Accounting Transportation and Climate Authority to attend a 54 00:08:20,370 --> 00:08:28,610 immunity and elected official gathering at the Corona Road and Petalumin North Station with some of my colleagues and staff. 55 00:08:29,450 --> 00:08:35,230 And we had the opportunity to meet with Congressman Thompson and city representatives from the city Paluma. 56 00:08:35,230 --> 00:08:58,310 It was mind-blowing to see the amount of construction homes and otherwise happening in around the northern pedolumistation and then also really shocking to see the road conditions that pedestrians and bicycles have to take, you know, their lives in their hands to cross over the 101 there to get to downtown pedoluma and everything that happens in pedoluma on the west side of the freeway. 57 00:08:58,310 --> 00:09:06,490 And so, SETA and our partners and also representatives of Taltrans and the City and all the agencies 58 00:09:06,490 --> 00:09:11,090 involved were there to really learn about what are the impacts for folks as they're 59 00:09:11,090 --> 00:09:12,330 trying to cross over the 101. 60 00:09:12,650 --> 00:09:18,150 But it was really so wonderful to see how much that northern smart station has become a hub 61 00:09:18,150 --> 00:09:24,730 for that community in Petaluma and the development that's happening around it and how to 62 00:09:24,730 --> 00:09:30,510 the connections to and from that Smart Station to really make it safe and accessible for folks in 63 00:09:30,510 --> 00:09:34,590 the community both the business park that's over there as well as getting to the businesses downtown. 64 00:09:34,890 --> 00:09:39,790 So it was a great opportunity to get to attend and so many of my colleagues and others 65 00:09:39,790 --> 00:09:44,390 were able to be there and we're hoping to find a solution to get people safely over that over 66 00:09:44,390 --> 00:09:52,030 past in the coming months and hopefully not years. Thanks. Great. Thank you. Yes, thank you. 67 00:09:52,030 --> 00:09:57,730 Um, my daughter and I were able to take smart, uh, in the ferry for a trip to see the 68 00:09:57,730 --> 00:09:59,070 Valkyries last Wednesday. 69 00:09:59,330 --> 00:09:59,970 It was really, really, really. 70 00:10:00,000 --> 00:10:04,960 Really fun. But I guess you guys have probably been more interested in hearing that I'm working on getting guys 71 00:10:04,960 --> 00:10:06,520 are available into the planet MTC. 72 00:10:08,560 --> 00:10:12,840 But the truth to the city with my daughter was so, but we did 73 00:10:12,840 --> 00:10:18,320 go to MTC first actually. So before we went to the offerings game and I just wanted to let the 74 00:10:18,320 --> 00:10:23,940 board know that I'm diligently working with staff there to make progress towards guys are there. 75 00:10:24,640 --> 00:10:25,280 Great. 76 00:10:26,160 --> 00:10:29,080 That's see all the sites both MTC and Delqueries. 77 00:10:29,240 --> 00:10:31,040 And the Delqueries won by the way. 78 00:10:31,240 --> 00:10:32,220 And the trains were full. 79 00:10:32,680 --> 00:10:33,440 Both ways as well. 80 00:10:34,460 --> 00:10:35,940 Oh, very good. 81 00:10:36,840 --> 00:10:37,740 Other comments. 82 00:10:38,360 --> 00:10:39,340 Drick to bark. 83 00:10:41,220 --> 00:10:43,380 That was my purse that one. 84 00:10:44,580 --> 00:10:45,220 Okay. 85 00:10:47,060 --> 00:10:47,880 Vice chair. 86 00:10:47,880 --> 00:10:48,320 Vice chair, sir. 87 00:10:49,300 --> 00:10:54,300 So Santa Felicity School started school today as I know many of the schools around have. 88 00:10:54,300 --> 00:10:56,880 And my teenager yesterday, I said, 89 00:10:56,920 --> 00:10:58,380 what are you going to do with your last day of summer? 90 00:10:58,440 --> 00:11:01,740 And she said, I'm taking the smart train to spend my tax 91 00:11:01,740 --> 00:11:02,920 hours in Santa Rosa. 92 00:11:04,480 --> 00:11:08,200 But sorry, the Santa fell, unfortunately. 93 00:11:09,060 --> 00:11:13,480 But I'm curious what we'll see in ridership around the school 94 00:11:13,480 --> 00:11:15,580 starting over the next couple of weeks 95 00:11:15,580 --> 00:11:19,900 in sort of what it definitely was the teenager activity 96 00:11:19,900 --> 00:11:21,540 of the summer was to take the train. 97 00:11:22,820 --> 00:11:25,780 Great. Any other board member announcements? 98 00:11:26,820 --> 00:11:30,800 If not, we'll move on to the General Manager's report. 99 00:11:31,760 --> 00:11:32,100 Which comments? 100 00:11:33,460 --> 00:11:36,080 Thank you. Good afternoon, Chairman Board of Directors. 101 00:11:37,380 --> 00:11:39,160 I have eight items today. 102 00:11:39,400 --> 00:11:42,000 Go over contracts with the comments over $100,000. 103 00:11:42,940 --> 00:11:44,440 I'll provide the ridership report. 104 00:11:44,520 --> 00:11:47,640 I have some info on our July event service. 105 00:11:47,640 --> 00:11:53,960 Just a quick update on the Black Point Bridge, and then I want to inform the board 106 00:11:53,960 --> 00:11:57,500 us some changes that are upcoming with the Cell and Real Paths. 107 00:11:57,760 --> 00:12:03,160 I have an update on the Pathway status and a little info on the recent app to tech conference, 108 00:12:03,380 --> 00:12:07,340 and then we will take a moment to recognize our employee of the quarter, and of course, 109 00:12:07,480 --> 00:12:09,380 it's the end to be happy to answer any questions. 110 00:12:11,640 --> 00:12:16,120 Starting with contracts and procurement, so over $100,000, I have three items to share. 111 00:12:16,120 --> 00:12:22,200 the first one is the purchase order with the California Department of Fish and Wildlife. 112 00:12:22,540 --> 00:12:26,600 This purchase is for a permit fee for the Hillsburg Extension Project, 113 00:12:27,000 --> 00:12:35,180 and the award amount was $112,863. Next is a contract with Samuel R. Whitehead BBA 114 00:12:35,180 --> 00:12:41,560 Precision Wireless Service. This contract is for un-call technical support, inspection, and preventative 115 00:12:41,560 --> 00:12:48,460 maintenance for SmartSplan mobile radio system, contract amount was $179,520. 116 00:12:49,520 --> 00:12:54,700 And the third contract was with Hanford Applied Restoration and Conservation. 117 00:12:55,280 --> 00:13:01,000 This contract is for the Crane Creek Fittal Neck Drainage Repairing Enhancement Project, 118 00:13:01,460 --> 00:13:06,500 and the contract amount was $130,450 in 50 cents. 119 00:13:08,680 --> 00:13:12,980 Moving on to ridership, you're going to hear a theme this month, because July was absolutely 120 00:13:12,980 --> 00:13:21,960 the best month ever for smart in our history. July ridership was 163,276, and for those 121 00:13:21,960 --> 00:13:28,120 keeping track, this was the fourth straight month of an all-time record. We set the record in April, 122 00:13:28,320 --> 00:13:35,340 we broke it in May, we broke it again in June, and we broke the record again in July. July ridership was 23 123 00:13:35,340 --> 00:13:44,360 percent higher than July of 25. And we carried almost 3.2 million passenger miles in July. 124 00:13:44,700 --> 00:13:49,040 That's a new all-time monthly record in the first time that we've carried over 3 million 125 00:13:49,040 --> 00:13:51,220 passenger miles in a single month. 126 00:13:54,770 --> 00:13:58,550 So taking a look at average weekday ridership, the July 127 00:13:58,550 --> 00:14:07,110 average weekday ridership was 5,568. That was 17% higher than July of 2025. And believe it or not, 128 00:14:07,110 --> 00:14:11,290 perhaps we're actually doing better this month, August average weekday 129 00:14:11,290 --> 00:14:18,670 ridership to date is 5,684 and that's 21% higher than August of 25. 130 00:14:21,190 --> 00:14:29,450 Pathway counts were also at an all-time high July pathway trips were 134,181 and as 131 00:14:29,450 --> 00:14:36,330 you would expect that is a new all-time monthly record. Not to be outdone July that 132 00:14:36,330 --> 00:14:45,750 say July, not June, July, connect ridership was 3,378. That was 26% higher than last year and again, 133 00:14:45,830 --> 00:14:46,950 a new monthly record. 134 00:14:49,360 --> 00:14:54,340 So a big reason for this success was a special event service. We offered to support 135 00:14:54,340 --> 00:14:56,960 the Marine County Fair and Windsor Caboom. 136 00:14:57,140 --> 00:14:59,200 I will start with the Marine County Fair. 137 00:15:00,000 --> 00:15:21,260 Membership with the Fair Smart Offered Special Service July 1st through the 5th, and over the 5th day period, we supported 11,747 trips to and from Civic Center Station. The extra late night service served 3,758 trips, which was 39% higher than last year. 138 00:15:23,150 --> 00:15:29,590 We also ran extra event service for the Windsor Caboom fireworks event on July 3rd we supported 139 00:15:29,590 --> 00:15:37,930 2,099 trips to and from Windsor Station and the extra late night service included 2 train 140 00:15:37,930 --> 00:15:43,670 trips and served 673 trips which was about 4% higher than last year. 141 00:15:45,830 --> 00:15:50,810 I'm also very very very very happy to report that the Black Point Bridge emergency repairs 142 00:15:50,810 --> 00:15:53,710 were completed and the bridge is open for service. 143 00:15:57,010 --> 00:16:03,790 I also wanted to take a moment to update the board and the public on an upcoming cancellation of the sale in railpass. 144 00:16:03,830 --> 00:16:08,570 The sale in railpass was originally a launch as a one year pilot project. 145 00:16:09,750 --> 00:16:20,870 At the request of Golden Gate, the pass is being phased out. Passes can be purchased until October 31st and November 30th will be the last day the passes can be used. 146 00:16:20,870 --> 00:16:37,590 So moving forward with the Clipper Interagency Transfer Credit, adult fares for trips on smart transferring to the ferry range from $8.15 to $14.15 depending on the number of zones and individual rides. 147 00:16:39,380 --> 00:16:49,340 One to provide a quick update on our pathway projects, we have some that are close to construction and others that are still in the grant phase. 148 00:16:49,860 --> 00:16:55,480 I will start with those that are close to construction. First up is Joe Redo to the third street in Santa Rosa. 149 00:16:55,960 --> 00:17:02,660 We plan to award that contract in January of 27 and we are planning for construction in the summer of 27. 150 00:17:02,660 --> 00:17:07,800 And a wrench to roll in in Nevada, we are currently awaiting federal environmental clearance 151 00:17:07,800 --> 00:17:14,820 and an execution of an FDA grant and we are aiming for construction contract in the spring of 2027. 152 00:17:15,580 --> 00:17:19,040 Santa Rosa North to airport is in the same boat as Santa Ranch. 153 00:17:19,080 --> 00:17:24,840 We are waiting for that federal environmental clearance and execution of the FDA grant. 154 00:17:25,220 --> 00:17:28,680 And again, we're aiming for construction contract in the spring of 27. 155 00:17:28,680 --> 00:17:36,500 in a perfect world we would do these two projects at the same time. We also have other 156 00:17:36,500 --> 00:17:41,900 pathway projects in the pipeline and we have several new grant applications pending. First 157 00:17:41,900 --> 00:17:49,620 up is O-Bag 4, S-E-C-E-C-A staff recommendations include three segments. The first would be $800,000 158 00:17:50,220 --> 00:17:55,920 that would go to the city of Petaloma for Lakeville to water street construction. The segment is 159 00:17:55,920 --> 00:17:58,360 to sum is the missing 500 feet. 160 00:17:59,280 --> 00:18:04,720 This is also 2.1 million that would go for East Railroad to PIN Grove. 161 00:18:05,740 --> 00:18:09,360 Sorry, 2.1 million for the East Railroad to PIN Grove segment. 162 00:18:09,800 --> 00:18:15,740 This funding is not enough to construct this project, but would allow us to make a significant progress. 163 00:18:16,500 --> 00:18:23,720 And then there's also a recommendation for $2 million for Cloverdale station area planning and preliminary engineering. 164 00:18:23,720 --> 00:18:26,740 this project is currently pending eligibility. 165 00:18:27,740 --> 00:18:34,360 We also submitted an application to TAN for 4.5 million to construct the Smith Ranch to 166 00:18:34,360 --> 00:18:41,080 Mane Gate segment and we will be submitting an application for RM3 safe routes to transit 167 00:18:41,080 --> 00:18:48,000 and Bay Trail program. This application is due to MTC on October 5th and we will be requesting 168 00:18:48,000 --> 00:18:52,900 an additional 10.5 million for the Smith Ranch to Mane Gate construction. 169 00:18:56,560 --> 00:19:07,360 And as this board knows, our information technology team supports the systems and the communications that are vital to smart daily operations from the systems that control train operations. 170 00:19:07,960 --> 00:19:16,400 To the office technology systems to the broadcasting of these board meetings and please to recognize information systems manager Brian Crowley. 171 00:19:16,400 --> 00:19:25,700 We represent its smart at the recent 2026 at the tech conference in St. Louis and serves as chair of the app's information technology subcommittee. 172 00:19:26,360 --> 00:19:34,400 His involvement keeps smart connected to national conversations on emerging technology, cybersecurity, data, and fair modernization. 173 00:19:35,660 --> 00:19:40,180 His involvement helps bring back valuable ideas and best practices to smart. 174 00:19:40,500 --> 00:19:44,120 So thank you Brian and the information technology team for all you do. 175 00:19:51,230 --> 00:19:59,970 And last but not least today we are recognizing our employees of the second quarter of 2026 as a reminder employees are nominated by 176 00:20:00,720 --> 00:20:21,360 And the winners receive a certificate and day off with pay. This month's employee of the quarter, we only have one, this month is Cody Sosa. Cody is a vehicle maintenance labor. Unfortunately, he was not able to be here today, but we are thrilled to recognize Cody as our employee of the quarter. Please join me in giving Cody a round of applause. 177 00:20:27,960 --> 00:20:30,220 And with that, I would be happy to answer any questions. 178 00:20:31,940 --> 00:20:32,860 Thank you, Eddie. 179 00:20:34,320 --> 00:20:36,800 Questions on the General Manager's report? 180 00:20:37,640 --> 00:20:38,280 Director Hooken. 181 00:20:38,580 --> 00:20:39,440 I just a quick one, Eddie. 182 00:20:39,540 --> 00:20:41,540 Thank you so much for the update on the pathways. 183 00:20:42,160 --> 00:20:45,200 I think you covered most all of the key remaining segments. 184 00:20:45,380 --> 00:20:46,660 Is there anything you could provide on it? 185 00:20:46,680 --> 00:20:52,020 I believe it would be a Hamilton Parkway to kind of the portion of the Bay Trails. 186 00:20:52,080 --> 00:20:55,040 That segment and also the segment over Nevada Creek. 187 00:20:59,540 --> 00:21:01,520 Bill, you want to take that? 188 00:21:01,520 --> 00:21:06,520 just kind of just a quick little status update of where those. I think those are the private two other remaining segments. 189 00:21:09,610 --> 00:21:11,610 Bill game on chief engineer was smart. 190 00:21:12,430 --> 00:21:15,710 In terms of design, we've got those two about a 50% level. 191 00:21:15,950 --> 00:21:18,490 We're probably going to pursue design build on them. 192 00:21:18,930 --> 00:21:22,170 But for funding, I would have to defer to the grant side of the house. 193 00:21:27,980 --> 00:21:30,200 All right. We need to go find money. I get it. 194 00:21:30,680 --> 00:21:32,200 That's all I need. Thank you. 195 00:21:35,820 --> 00:21:39,840 Thank you so much, I, you know, have a city council meeting tonight. 196 00:21:40,040 --> 00:21:45,080 I always love coming back with the, you know, Olympic record breaking that goes on here. 197 00:21:45,720 --> 00:21:46,400 Two questions. 198 00:21:46,720 --> 00:21:51,220 One was, you know, I actually lately installed mascots. 199 00:21:51,720 --> 00:21:54,220 And, you know, I wrote smart this week and I'm writing it. 200 00:21:54,780 --> 00:21:58,700 For all of the events that we had, like the Morin Fair and just generally, 201 00:21:58,700 --> 00:22:12,780 are, you know, how is the coordination going with the transit partners or, you know, I'm just curious because it looks very impressive, you know, when I get in there and I'm wondering if there are any glitches or, you know, how that's how that's coordinating with, you know, obviously better ridership. 202 00:22:13,140 --> 00:22:21,920 Yeah, things are going well. I heard from, from Golden Gate the other day that their ridership is up eight to half percent. 203 00:22:21,920 --> 00:22:25,000 And so they're seeing a bump in ridership as well. 204 00:22:25,060 --> 00:22:30,820 So that's always good to see when you're seeing ridership gains, not just on smart, but also on the bus. 205 00:22:31,280 --> 00:22:33,800 They are planning to make some additional changes. 206 00:22:34,000 --> 00:22:36,640 I don't want to see the day because I don't know exactly when it is. 207 00:22:36,700 --> 00:22:39,740 I think sometimes in August they're going to make some just schedule adjustments. 208 00:22:41,540 --> 00:22:44,600 They've made a lot of changes so that we make in a couple more 209 00:22:44,600 --> 00:22:47,740 little tweaks to the schedule to better align and things like that. 210 00:22:48,180 --> 00:22:50,860 But overall so far things have gone really, really well. 211 00:22:50,860 --> 00:22:53,700 and I look forward to doing more of this in the future. 212 00:22:54,160 --> 00:23:03,020 Do we get data from them as to what the real good connectors are, where the bottlenecks might be? 213 00:23:03,240 --> 00:23:09,000 I mean, I feel like we probably have a pretty good network, you now, of end-to-end ridership, 214 00:23:09,360 --> 00:23:12,620 and that is that becoming something useful to you. 215 00:23:12,700 --> 00:23:15,120 Yeah, I can share some information with you. 216 00:23:15,280 --> 00:23:18,860 We gave a presentation last month at the board meeting here. 217 00:23:18,860 --> 00:23:28,320 And so with there was some there was some transfer data and things like that. And there the big transfer location as you was suspect is that downtown San Rafael. 218 00:23:29,280 --> 00:23:39,080 But yeah, we we are tracking that data looking at how things work and looking at how much transfers have done up since we put this service out there. 219 00:23:39,300 --> 00:23:39,860 Thank you. 220 00:23:40,500 --> 00:23:41,860 Great to have it. 221 00:23:42,500 --> 00:23:47,740 Yeah, I feel obligated to just thank you for the announcement or the rail in the sale. 222 00:23:47,740 --> 00:23:49,120 I think it's important to get that out there. 223 00:23:49,240 --> 00:23:50,840 So thank you for transparency there. 224 00:23:51,020 --> 00:23:54,920 And as one of three Golden Gate board members here, 225 00:23:55,240 --> 00:23:57,520 the discontinuation of that pilot program, 226 00:23:57,640 --> 00:23:59,520 hopefully at some point we can bring that back, 227 00:23:59,640 --> 00:24:01,600 we look at the overall pricing. 228 00:24:01,760 --> 00:24:05,580 I know that some people get a benefit. 229 00:24:07,020 --> 00:24:10,160 If you're closer, it's going to be cheaper without it. 230 00:24:10,220 --> 00:24:12,180 If you're other way, it's going to be a little bit more. 231 00:24:12,460 --> 00:24:13,540 But finding that sweet spot. 232 00:24:13,680 --> 00:24:16,400 And then also, I'm not sure if it's related to you, 233 00:24:16,400 --> 00:24:20,900 that I know that Clifford 2.0 will provide a lot more flexibility in terms of those pricing 234 00:24:21,440 --> 00:24:21,920 packages. 235 00:24:22,680 --> 00:24:22,740 Yes. 236 00:24:22,740 --> 00:24:27,180 And all these unique one-offs take up bandwidth within the existing system that I know has 237 00:24:27,180 --> 00:24:29,860 been a problem for years that we're trying to fix. 238 00:24:30,660 --> 00:24:37,180 So look forward to advocating and cooperating, collaborating with smart, maybe a spring-time 239 00:24:37,180 --> 00:24:42,000 launch or a summer launch that will drive up some ridership will be a good thing in the future. 240 00:24:43,120 --> 00:24:43,220 Great. 241 00:24:45,140 --> 00:24:48,900 I just want to talk about the ping rope, the katati trail. 242 00:24:49,300 --> 00:24:53,580 That is the one trail that I get the most comments on because it's so dangerous right now. 243 00:24:53,680 --> 00:24:55,500 So I'm grateful that that's moving forward. 244 00:24:55,980 --> 00:24:59,920 But the extra 500 feet what it means is it takes people off a very narrow. 245 00:25:00,000 --> 00:25:13,860 Part of Lakeville to get to Washington Street. So they'll be able to connect with Washington Street from the bridge from downtown to Lakeville. It's so much safer for families and commuters. So this is fantastic. 246 00:25:16,060 --> 00:25:17,260 Yes, Dr. Kelly. 247 00:25:17,700 --> 00:25:27,440 I'm at a question. I don't know if you're able to put the slides back up from your report presentation, but the slide regarding the Oback funded projects and segments. 248 00:25:27,440 --> 00:25:36,080 So, I had a question about, I think it was like the third of the fourth one on the list of projects that are being recommended for funding. 249 00:25:37,100 --> 00:25:46,720 It was pending if there was feasibility regarding eligibility for the Cloverdale station area planning $2 million. 250 00:25:47,380 --> 00:25:55,920 And since really apologize since this is probably a CTA item and not a smart item, but do you know, since there's four CTA folks here. 251 00:25:55,920 --> 00:26:03,980 If that smart stationary planning $2 million is ineligible for O-backed for what does that mean? 252 00:26:04,000 --> 00:26:10,960 Does that mean that there is capacity in smart kind of carve out there that we can 253 00:26:10,960 --> 00:26:15,660 submit a different project or does that mean that it's kind of a user who's isn't if it's ineligible 254 00:26:15,660 --> 00:26:21,420 then that's $2 million that we're unable to secure and then what does eligibility look like? 255 00:26:21,420 --> 00:26:23,740 I'll let you in into that one. 256 00:26:23,920 --> 00:26:26,440 Good afternoon, Joanne Parker, Grant's manager. 257 00:26:27,740 --> 00:26:28,880 There's a couple of answers. 258 00:26:29,720 --> 00:26:37,120 One is SCTCA, like Tam has been given a budget of O-Bag funds larger than there is available. 259 00:26:37,640 --> 00:26:43,020 And I don't remember the exact dollar figure, but it's like a couple million more for Sonoma County. 260 00:26:43,620 --> 00:26:46,360 Then there's available to be programs. 261 00:26:46,360 --> 00:27:12,100 So, once SSETA approves the list of projects that will go to NTC for final arbitration, in terms of the content of the Cloverdale related item, we're sorting through eligibility based on what work we're planning to tackle, specifically the jurisdictions have to be compliant with the host of NTC requirements, complete streets policy, 262 00:27:12,100 --> 00:27:18,140 in communities policy a few others and there's some confusion over whether 263 00:27:18,140 --> 00:27:19,240 Cloverdale is eligible. 264 00:27:20,520 --> 00:27:21,920 So we're just sorting through that. 265 00:27:22,480 --> 00:27:26,000 If for some reason we can't do the work in our right of way. 266 00:27:27,020 --> 00:27:32,360 And then we will be given the opportunity to put it somewhere else inside the 267 00:27:32,360 --> 00:27:34,060 System if needed. 268 00:27:35,280 --> 00:27:36,360 Great. Thank you. 269 00:27:36,600 --> 00:27:37,900 Got the SETA board discretion. 270 00:27:39,420 --> 00:27:46,460 You know what the timeline looks like for the determination of the eligibility on that. 271 00:27:47,140 --> 00:27:50,200 It's MTC that's evaluating it. 272 00:27:50,200 --> 00:27:53,780 I think we're going to have a conversation with some staff people to figure out what pieces 273 00:27:53,780 --> 00:27:54,520 might fit. 274 00:27:54,980 --> 00:28:00,380 The SECA board is going to take up the full list of recommendations in September. 275 00:28:01,080 --> 00:28:01,320 Yes. 276 00:28:02,100 --> 00:28:08,080 So this is all going to get ironed out before the full list comes back to the STTCA board in less than a month. 277 00:28:09,060 --> 00:28:09,080 Okay. 278 00:28:09,320 --> 00:28:09,340 Sure. 279 00:28:09,960 --> 00:28:10,320 Great. 280 00:28:14,160 --> 00:28:15,580 We're here to hear first. 281 00:28:16,280 --> 00:28:18,940 Any other questions on Joe Managers report? 282 00:28:19,100 --> 00:28:22,800 We'll go to public comment on the General Managers report. 283 00:28:22,960 --> 00:28:23,740 Anyone in the room? 284 00:28:24,400 --> 00:28:26,900 Want to comment to the board? 285 00:28:27,880 --> 00:28:28,620 We'll see anyone. 286 00:28:29,140 --> 00:28:29,960 Anyone online? 287 00:28:30,480 --> 00:28:30,800 Oh, sorry. 288 00:28:30,800 --> 00:28:33,140 come on up 289 00:28:42,420 --> 00:28:52,940 to I just want to find out if this is the item where General Manager is going 290 00:28:52,940 --> 00:29:00,000 to talk about the the future plan that he talked about the future direction 291 00:29:02,040 --> 00:29:03,380 in this. 292 00:29:03,380 --> 00:29:07,120 is you came in in the middle of his general 293 00:29:07,120 --> 00:29:08,620 in the middle in the hall of ties. 294 00:29:09,160 --> 00:29:12,620 There are several items on the agenda that talk about future. 295 00:29:13,080 --> 00:29:14,100 Is there anything? 296 00:29:14,360 --> 00:29:14,640 I'm sorry. 297 00:29:14,660 --> 00:29:14,980 Just a bit. 298 00:29:15,620 --> 00:29:22,020 It was about the strategic plan. 299 00:29:22,340 --> 00:29:25,060 So hopefully I can address it here. 300 00:29:25,820 --> 00:29:27,900 You can do that on our next item. 301 00:29:28,100 --> 00:29:28,560 Next item. 302 00:29:28,640 --> 00:29:29,000 Thank you. 303 00:29:29,000 --> 00:29:30,120 That matters not on the agenda. 304 00:29:30,620 --> 00:29:31,380 Thank you. 305 00:29:31,380 --> 00:29:35,580 So anyway, anyone online do you comment on the General Manager's report? 306 00:29:36,200 --> 00:29:39,200 We have one rent hand raised for public comment. Matthew Hartsell. 307 00:29:42,450 --> 00:29:46,310 Thank you. This is Matthew Hartsell, Director of Planning and WTB Tim, 308 00:29:46,630 --> 00:29:50,270 and want to thank the General Manager for the Smart Pathway update and 309 00:29:51,250 --> 00:29:56,790 express our strong support for the grant applications that were 310 00:29:56,790 --> 00:29:59,150 That is... 311 00:29:59,150 --> 00:29:59,970 Pathway from... 312 00:30:00,000 --> 00:30:05,720 This ranch road to main gate road. That is the key connection on the smart pathway between Santa 313 00:30:05,720 --> 00:30:12,500 Fell and Nevada, but two largest cities in Marin County. It's been a big gap out there for many 314 00:30:12,500 --> 00:30:17,700 years and it's great that Smart is now going after that one full speed ahead with two, it 315 00:30:17,700 --> 00:30:22,780 looks like two different grand applications. Good luck and we're available to support that application 316 00:30:22,780 --> 00:30:29,140 in whatever way we can. Also, please to see the inclusion of the Lakeville to water street segment 317 00:30:29,140 --> 00:30:36,260 in downtown Petaluma. That's a key local downtown connection that will help better connect downtown 318 00:30:36,260 --> 00:30:42,720 Petaluma and the existing Petaluma River and Lynch Creek Trail system in Petaluma to the 319 00:30:42,720 --> 00:30:50,100 smart pathway and great to see that that segment is being advanced as well. Thank you. Thank you, Matthew. 320 00:30:53,380 --> 00:30:54,140 Anyone else online? 321 00:30:57,650 --> 00:30:57,970 All right. 322 00:31:00,590 --> 00:31:03,890 Okay, no action on that one. We'll move to public comment on matters 323 00:31:03,890 --> 00:31:09,620 not listed on the agenda as your time? 324 00:31:19,680 --> 00:31:22,140 I think it's on, yeah, still. 325 00:31:24,810 --> 00:31:28,450 Well, one thing I'd notice is I want to thank 326 00:31:28,450 --> 00:31:32,630 the board members, all of them, particularly supervisor 327 00:31:32,630 --> 00:31:36,250 rabbit, for all his contributions over these many years. 328 00:31:36,630 --> 00:31:42,750 Really, I have been serving in our church for 22 years 329 00:31:42,750 --> 00:31:45,470 and they're not just Sundays, there are other days 330 00:31:45,470 --> 00:31:53,930 things like that, and it takes something. It's a commitment. It's a long-term thing. And there are 331 00:31:53,930 --> 00:32:00,210 a number of you who are doing that. I'm sure all of you, and I just wanted to say thank you 332 00:32:00,210 --> 00:32:05,450 for all those times, and they'll be another time when I can say thank you, but I wanted to say that. 333 00:32:06,630 --> 00:32:08,570 And, and, and, and, and to, 334 00:32:11,210 --> 00:32:21,410 um, you might be now, are you a assembly man or is that happening yet not yet so, okay, um, great. 335 00:32:21,410 --> 00:32:34,120 Well, we had a chance to meet with the manager, Eddie Cummins last month, and he was offering his 336 00:32:35,630 --> 00:32:44,290 he was asking us to consider things and describing some of the things that he anticipated for 337 00:32:44,290 --> 00:32:50,290 where we would go. And I want to congratulate everyone about the election being part of Francis 338 00:32:50,290 --> 00:32:58,690 smart and the transportation line use coalition that began this is really wonderful that we 339 00:32:58,690 --> 00:33:06,850 have going forward with a tremendous result, you know, sending a percentage huge. And it just 340 00:33:06,850 --> 00:33:13,530 shows how he has changed the perception and with the things that he did. And the board has supported 341 00:33:13,530 --> 00:33:22,870 him and you work great together. In the future, he has discussed some things, equipment, executive 342 00:33:22,870 --> 00:33:29,610 personnel. These things are really necessary to improve the effectiveness going forward 343 00:33:29,610 --> 00:33:36,270 that he's looking forward. That ask you to wrap it up. Okay. So those are those are things 344 00:33:36,270 --> 00:33:43,030 that we all acknowledge and going to the East as well and maybe we talk about 345 00:33:43,030 --> 00:33:47,090 Sassum, but maybe it's the capital quarter that we want to connect to and 346 00:33:47,090 --> 00:33:52,470 there may be different ways to do that. And so I want to acknowledge that and thank 347 00:33:52,470 --> 00:33:57,230 you all. Thank you. Anyone else in the room want to address the board for items 348 00:33:57,230 --> 00:34:04,950 not on the agenda? Anyone on mine? We have one hand raised for a public comment, 349 00:34:10,560 --> 00:34:17,420 Thank you. Good afternoon. Susan Kirk's Petalena. I've spoken in general public comment 350 00:34:17,420 --> 00:34:24,820 at your meetings for, I think, several meetings and exchange some written information with 351 00:34:24,820 --> 00:34:31,680 your staff appreciating your board court, Kairin, who seems to be very effective and I really 352 00:34:31,680 --> 00:34:37,920 appreciate her assistance. I did receive one written response from the chair, chair, 353 00:34:38,900 --> 00:34:59,980 Unfortunately, that only responded to one question that I had had not the core other issues, and those issues are, whether or not your organization has guardrails established boundaries, in other words, of policy when you own. 354 00:35:00,000 --> 00:35:15,560 Or to contract to affirm or an individual, bleeding affirm or specifically affirm about political activism in the county and the region. 355 00:35:17,440 --> 00:35:28,980 And that is because there is a political activist who is very active on social media regarding one of your current board members. 356 00:35:28,980 --> 00:35:36,780 and other candidates for office who are currently running, and some very pointed social media 357 00:35:36,780 --> 00:35:45,380 post-criticisms are frequent, and I would like to see your organization have a policy about 358 00:35:46,220 --> 00:35:54,180 political activism when you have persons doing work for all of Sonoma County, all of Morin County, 359 00:35:54,760 --> 00:35:58,500 for your organization. And I'd really appreciate it if someone could 360 00:35:58,500 --> 00:36:04,420 would could address this or point me to the place where the policy exists that I could 361 00:36:04,420 --> 00:36:04,840 review. 362 00:36:05,320 --> 00:36:06,280 Thank you very much. 363 00:36:09,650 --> 00:36:10,130 Thank you. 364 00:36:10,330 --> 00:36:11,010 Anyone else on that? 365 00:36:13,600 --> 00:36:15,940 At this time, there are no more hands raised for public comment. 366 00:36:16,480 --> 00:36:17,940 Thank you. 367 00:36:18,240 --> 00:36:24,700 Move on to our consent calendar which consists of items six A through six D. 368 00:36:26,740 --> 00:36:27,580 We have any questions 369 00:36:27,580 --> 00:36:30,160 from the board on any of the consent items? 370 00:36:33,480 --> 00:36:33,680 All right. 371 00:36:34,880 --> 00:36:36,840 Just a real quickly on consent. 372 00:36:37,360 --> 00:36:39,700 Because I know, Council Member Jake, if this is not here, 373 00:36:39,740 --> 00:36:41,080 but I know we'd probably want to mention, 374 00:36:41,520 --> 00:36:43,060 6C and just express the appreciation 375 00:36:43,060 --> 00:36:44,820 between the city of Nevada and Smart. 376 00:36:45,260 --> 00:36:48,160 This portion of all of Avenue has been a long plan 377 00:36:48,160 --> 00:36:50,940 within the city of Nevada, and this is a key milestone 378 00:36:50,940 --> 00:36:51,940 for the community. 379 00:36:52,460 --> 00:36:55,860 So, just thank you, and I want to express the appreciation there. 380 00:36:57,360 --> 00:36:58,300 Thank you, Director. 381 00:36:58,300 --> 00:37:06,080 who can, near the comments or questions on the consent calendar, go to public comment down 382 00:37:06,080 --> 00:37:06,940 the consent calendar. 383 00:37:07,260 --> 00:37:08,520 Anyone in the room, 384 00:37:10,710 --> 00:37:11,870 nope, anyone online, 385 00:37:14,080 --> 00:37:17,320 not there either, okay, look for a motion to 386 00:37:17,320 --> 00:37:19,140 accept and approve the consent calendar. 387 00:37:19,360 --> 00:37:20,680 May I come for you? 388 00:37:20,780 --> 00:37:21,180 Second. 389 00:37:21,920 --> 00:37:27,960 Move by Dr. Kelly, second by Director Luken, all in favor? 390 00:37:28,440 --> 00:37:28,680 Say aye. 391 00:37:29,000 --> 00:37:29,400 Aye. 392 00:37:29,400 --> 00:37:34,700 And he posed, abstained, all right, 393 00:37:37,670 --> 00:37:39,690 we'll move on to the regular calendar. 394 00:37:40,850 --> 00:37:46,490 Adam seven involves the proposed geyserville station, the the 395 00:37:46,490 --> 00:37:52,850 secret exemption determination and the information about the project from Zoe 396 00:37:52,850 --> 00:37:53,630 andra. 397 00:38:01,340 --> 00:38:03,600 Good afternoon chair members of the board. 398 00:38:04,060 --> 00:38:06,220 The item before you today is an action item. 399 00:38:09,060 --> 00:38:14,640 The recommendation is as follows to receive an update on the outreach efforts and receive 400 00:38:14,640 --> 00:38:18,960 the California Environmental Quality Act exemption to termination for the proposed 401 00:38:18,960 --> 00:38:25,740 Guide to Ville Station, adopt Resolution 2026-26 adopting the Guise of Ville Station project 402 00:38:25,740 --> 00:38:31,200 into Smart's program and approving the project and directing staff to file this sequence notice 403 00:38:31,200 --> 00:38:36,660 of exemption and directing staff to request the Guise of Ville Station be amended into relevant 404 00:38:36,660 --> 00:38:39,400 local, regional, state, and federal plans. 405 00:38:44,620 --> 00:38:47,360 So to start, I'd like to provide a little bit of context 406 00:38:47,360 --> 00:38:48,280 about Geiserville. 407 00:38:48,660 --> 00:38:52,120 Geiserville is located in Unincorporated Sonoma County. 408 00:38:52,960 --> 00:38:55,720 Geiserville is a census designated place, 409 00:38:55,960 --> 00:38:59,220 with or a CDP, and the Geiserville CDP population, 410 00:38:59,580 --> 00:39:03,540 according to the 2020 census, is 861. 411 00:39:03,960 --> 00:39:08,280 The CDP is depicted on the map here in Brownish, yellow. 412 00:39:09,560 --> 00:39:16,260 Within the CDP, there are 1,667 jobs according to the 2023 launch atonal employer household 413 00:39:16,260 --> 00:39:22,300 dynamics data and the proposed station that smart is putting forward is located within the urban 414 00:39:22,300 --> 00:39:28,580 service area and in the unincorporated area, the urban service area serves as the urban growth boundary 415 00:39:28,580 --> 00:39:36,000 for guides or bell. Also featured on the map are schools as well as the River Rock Casino, 416 00:39:36,000 --> 00:39:42,380 which is a large employer because he knows currently in a phase of expansion, which will bring 417 00:39:42,380 --> 00:39:48,660 it from 300 jobs to 700 jobs in a future expansion of the casino could result in a thousand jobs 418 00:39:48,660 --> 00:39:55,540 at that location. So while the station is proposed within the urban service area, we believe that a 419 00:39:55,540 --> 00:39:59,820 potential station will serve the broader geyser travel bill truck. 420 00:40:00,000 --> 00:40:04,040 Kaiserville, travel shed, mouthful. 421 00:40:06,450 --> 00:40:10,050 Just as a reminder, this effort really stems from community engagement 422 00:40:10,050 --> 00:40:18,550 with our general manager and our agency. It went back to conversations that took place in 2023, 423 00:40:19,410 --> 00:40:27,430 but the timeline on the screen is highlighting a focused engagement effort that took place starting in June, 424 00:40:27,430 --> 00:40:29,890 around the proposed Guisabilitation. 425 00:40:31,130 --> 00:40:33,290 We were here before this board in July 426 00:40:33,290 --> 00:40:37,090 and we are back to present the results of all of that outreach 427 00:40:37,090 --> 00:40:40,310 and for your consideration of project adoption. 428 00:40:43,880 --> 00:40:46,060 So those focused discussions with the board, 429 00:40:46,200 --> 00:40:48,960 the community of Guisville and the broader public occurred 430 00:40:48,960 --> 00:40:50,500 across several forums. 431 00:40:51,340 --> 00:40:54,620 Some of these were virtual, many were in person. 432 00:40:56,140 --> 00:40:57,360 The most recent being, 433 00:40:57,360 --> 00:40:59,140 our August 10th community meeting, 434 00:40:59,400 --> 00:41:01,300 which I will detail in the next slide. 435 00:41:03,740 --> 00:41:07,880 In August 10th, smart held a community meeting 436 00:41:07,880 --> 00:41:10,060 in Guiseville, where our general manager 437 00:41:10,060 --> 00:41:13,580 provided a brief presentation on the proposed station. 438 00:41:14,080 --> 00:41:16,200 We also had lots of staff on hand, 439 00:41:16,220 --> 00:41:18,520 from different departments to answer questions. 440 00:41:18,800 --> 00:41:20,680 Spanish translation was available. 441 00:41:21,960 --> 00:41:24,100 We had information boards that featured 442 00:41:24,100 --> 00:41:26,860 the station location, station rendering, 443 00:41:26,860 --> 00:41:35,040 as well as the pathway alignment and we had 140 people attending not including staff. 444 00:41:36,200 --> 00:41:40,520 A consistent with that kind of community spirit that's really driven this project, one of 445 00:41:40,520 --> 00:41:46,660 the things that was not anticipated was a member of the public asked for a handful for support 446 00:41:46,660 --> 00:41:53,220 for the station, which many of you may have seen in media coverage and you can see on this slide here. 447 00:41:54,120 --> 00:42:00,680 We were really pleased with the attendance if the event was well promoted through social media as well as with our partners. 448 00:42:01,480 --> 00:42:07,940 The guys reveal community in particular, the planning committee got the word out and we were pleased to see a lot of people in the room. 449 00:42:08,480 --> 00:42:16,720 There was also a lot of media coverage of the event and this picture is from the press Democrat article that ran the following day. 450 00:42:20,400 --> 00:42:29,600 In addition to the in-person and virtual meetings we also had a public survey available between July 1st and August 16th. 451 00:42:29,600 --> 00:42:32,220 The survey was available in English and Spanish. 452 00:42:32,920 --> 00:42:38,840 At the meeting we also had hard copies of the survey to complete and were very pleased with the responses. 453 00:42:39,480 --> 00:42:42,420 We had 797 responses in total. 454 00:42:42,900 --> 00:42:50,340 9 were in Spanish, 698 were in English and the survey was very well promoted across social media. 455 00:42:50,340 --> 00:42:54,000 digital newsletter, print flyers, and our project website. 456 00:42:57,220 --> 00:43:00,020 So to quickly get into the survey results, 457 00:43:00,320 --> 00:43:03,500 on the question of should smart ad estation and geyserville, 458 00:43:04,220 --> 00:43:08,380 among all respondents 90% were in support of the station, 459 00:43:09,040 --> 00:43:14,200 9% were not supportive and 1% left that response blank. 460 00:43:14,940 --> 00:43:17,500 And this cross section here, you can see, 461 00:43:17,560 --> 00:43:21,860 among different population sectors responding to the survey, 462 00:43:21,860 --> 00:43:27,080 There was consistent support for the stations, so on the screen you can see support among 463 00:43:27,080 --> 00:43:33,060 guisable residents, support among guisable workers, as well as the support from Cloverdale 464 00:43:33,060 --> 00:43:33,720 residents. 465 00:43:37,550 --> 00:43:41,850 This is true even when you look at responses by age demographic. 466 00:43:42,470 --> 00:43:48,810 The graph on the left shows the percentage of support versus opposition by age brackets. 467 00:43:48,810 --> 00:43:57,210 Notably, respondents in the 18 and under 18 to 24 and 25 to 34 age groups were strongly 468 00:43:57,210 --> 00:43:58,010 in favor. 469 00:43:58,310 --> 00:44:03,110 However, all age brackets had at least 90% or greater rate of support. 470 00:44:08,100 --> 00:44:15,060 And on the question of should smart locate a station at Highway 28 and Remmel Road, 88% 471 00:44:15,060 --> 00:44:21,240 of all respondents supported the proposed location, 90% of respondents that reside in 472 00:44:21,240 --> 00:44:26,880 as a grid with the location, you can see here on the left a picture of the proposed station 473 00:44:26,880 --> 00:44:29,380 location relative to downtown Guiserville. 474 00:44:30,940 --> 00:44:35,880 12% of total respondents disagreed with the station location and I will go into a little 475 00:44:35,880 --> 00:44:38,220 detail on that group. 476 00:44:40,530 --> 00:44:47,370 So among the 12% respondents that disagreed with the station location, 61% of those opposed 477 00:44:47,370 --> 00:44:55,370 the project outright, and that's equivalent to 5% of all the survey respondents and 20% 478 00:44:55,370 --> 00:44:59,970 of those disagreed with the location saying that Cloverdale should instead be proud. 479 00:45:00,000 --> 00:45:08,380 And I'm sorry, there are labels on my version of this pie chart that you are not seeing, but I can just briefly label them for you. 480 00:45:09,360 --> 00:45:17,380 The purple color was 61% represents those respondents who do not support the project at all. 481 00:45:18,580 --> 00:45:26,580 20% in the other kind of perplish color. Those are people that feel that clover dayl should be prioritized first. 482 00:45:26,580 --> 00:45:56,280 We had, in the next to the left there, the two small slivers, both represent 3%, we had 3% of respondents say they preferred a heelsberg station, another 3% preferred another location in Guiserville, 8% in that light blue pie slice, believe other smart priorities are more important, i.e. completing halfway gaps, and the 6% in that kind of lightish blue, 483 00:45:57,120 --> 00:46:04,180 preferred adding a station elsewhere on the corridor, suggesting places like Nevada, Santa Rosa, or Pengrove. 484 00:46:09,410 --> 00:46:15,970 When asked if you were able to connect to Guiseville via a smart station, where would you travel to or from? 485 00:46:16,450 --> 00:46:18,770 The responses on the right show. 486 00:46:19,310 --> 00:46:29,390 What is confirmed already with existing and established travel patterns that are strong between Guiseville and neighboring communities, such as Cloverdale fields, Bergen Windsor, 487 00:46:29,390 --> 00:46:31,450 as well as San Arosa. 488 00:46:32,810 --> 00:46:35,030 And what this tells us is that a real connection 489 00:46:35,030 --> 00:46:38,650 could effectively serve an existing travel market. 490 00:46:42,580 --> 00:46:45,400 So in terms of equity and demographic considerations, 491 00:46:45,980 --> 00:46:49,680 63% of the population in the Guidesville CDP 492 00:46:49,680 --> 00:46:53,660 is white alone, 36% is non-white, 493 00:46:53,880 --> 00:46:55,980 or identify as more than one race, 494 00:46:56,420 --> 00:46:59,700 and 34% of the population are Hispanic or Latino, 495 00:47:00,380 --> 00:47:01,860 and this tracks pretty consistently 496 00:47:01,860 --> 00:47:06,460 with the proportion of white and non-white residents in SMART's two county district. 497 00:47:07,540 --> 00:47:11,660 But what does stand out is that the proportion of households in Gyeserville with the household 498 00:47:11,660 --> 00:47:19,060 income of $50,000 or lower is greater relative to the proportion in the two county district. 499 00:47:23,180 --> 00:47:28,440 In terms of the project rationale and objectives, a Gyeserville station will allow train access 500 00:47:28,440 --> 00:47:34,020 for residents, workers, and visitors to Gyeserville. It will maximize the utility of the rail system 501 00:47:34,020 --> 00:47:38,440 without harming railroad operations, it will make more trips on the pathway between 502 00:47:38,440 --> 00:47:44,200 Cloverdale, Guyserville, and Hieldsburg possible, and it will also allow for the segmentation 503 00:47:44,200 --> 00:47:48,260 of the delivery of the extension between Hieldsburg and Cloverdale. 504 00:47:49,280 --> 00:47:53,820 So to summarize, the station really fulfills many of smart strategic objectives. 505 00:47:54,760 --> 00:47:56,940 Number one, completing the system to Cloverdale. 506 00:47:57,260 --> 00:48:02,080 Number two, maximizing the benefits and usefulness of the system, and three, effectively 507 00:48:02,080 --> 00:48:06,680 connecting communities along the corridor to offer a transit alternative to the 101. 508 00:48:10,000 --> 00:48:16,200 Some other business case considerations, the station will provide a rail alternative to those 509 00:48:16,200 --> 00:48:20,800 existing and future travel markets between guiserville and communities on the corridor. 510 00:48:22,280 --> 00:48:28,780 Of the workers in the central, excuse me, in the census designated place area, 40% of that 511 00:48:28,780 --> 00:48:33,840 that's coming into guys or they'll come from places along SmartScore at or. 512 00:50:04,900 --> 00:50:12,640 So I'll just start from the top apologies. Just in terms of other business case considerations, but we believe that 513 00:50:12,640 --> 00:50:20,820 this station will provide a real alternative to existing and future travel markets. I was mentioning that the census 514 00:50:20,820 --> 00:50:29,540 designated place that is Geyserville has 1,067 jobs, about 1,030 of those jobs are held 515 00:50:29,540 --> 00:50:35,600 by people who live outside of Geyserville and commute in. And 40% of that incoming workforce 516 00:50:35,600 --> 00:50:39,880 are coming from places already served by the smart corridor. So we believe we have a built-in 517 00:50:39,880 --> 00:50:46,020 travel market that could be served if we had a station there. With that established travel market 518 00:50:46,020 --> 00:50:51,960 That means there's great potential for mode shift, both in terms of the benefits of reducing 519 00:50:51,960 --> 00:50:59,000 vehicle miles traveled and the associated transportation, transportation generated CO2 emissions 520 00:50:59,000 --> 00:51:04,100 from those trips that would occur by getting those trips onto the train and out of a car. 521 00:51:05,520 --> 00:51:11,480 Importantly, the station would provide access to education, jobs, affordable housing, and health care. 522 00:51:11,480 --> 00:51:17,460 The nearest healthcare facilities are located in Cloverdale and Hillsburg, and it would also 523 00:51:17,460 --> 00:51:22,800 make employment education and other opportunities more accessible to you guys with the residents. 524 00:51:23,720 --> 00:51:28,780 And finally, it supports economic impact by increasing business reach to a broader customer base 525 00:51:28,780 --> 00:51:31,320 as well as a larger employee pool. 526 00:51:35,230 --> 00:51:39,450 Staff evaluated the project relative to Sequa and the project 527 00:51:39,450 --> 00:51:49,190 is statutorically exempt under the public resources code section 21080.25 subdivision 528 00:51:49,190 --> 00:51:55,830 be paragraph six sub paragraph a as it is a public project for the improvement institution 529 00:51:55,830 --> 00:52:01,610 or increase of passenger rail service including the maintenance construction or rehabilitation 530 00:52:01,610 --> 00:52:07,990 of stations. The project meets all the following conditions of the exemption as it will be 531 00:52:07,990 --> 00:52:15,750 by a public agency. It is within existing public right-of-way. It will be exclusively used by 532 00:52:15,750 --> 00:52:22,730 certified Tier IV locomotives. It is located within the North Coast Air Basin, which is in attainment 533 00:52:22,730 --> 00:52:30,470 for particulate matter and ozone. It does not include single occupancy vehicle trips, adding additional 534 00:52:30,470 --> 00:52:36,610 highway lanes or capacity. It does not require the demolition of affordable housing units and the 535 00:52:36,610 --> 00:52:44,910 project cost is under $50 million. In meeting the conditions of the statutory exemption, the board must 536 00:52:44,910 --> 00:52:51,410 certify that the project will be completed by a skilled and trained workforce. This clause is specified 537 00:52:51,410 --> 00:52:53,890 in the resolution attached to this item. 538 00:52:56,430 --> 00:52:59,050 So with that, I bring it back to the recommendation 539 00:52:59,050 --> 00:53:08,590 that is before this board and should the board choose to act and approve the project, staff will 540 00:53:08,590 --> 00:53:13,990 file the notice of exemption and we will work with our local, regional, state and federal partners 541 00:53:13,990 --> 00:53:20,270 to include the project in the relevant plans. We will also continue to pursue grant funding 542 00:53:20,270 --> 00:53:25,930 opportunities to complete the system to global, global, inclusive of a geyserville station, 543 00:53:25,930 --> 00:53:33,570 and we'll do ongoing outreach work, outreach work with the community. With that, I open for any 544 00:53:33,570 --> 00:53:34,110 questions. 545 00:53:36,360 --> 00:53:42,880 Thank you, Zoing. Before we go to questions, I just want to compliment staff on what 546 00:53:42,880 --> 00:53:50,620 appears to be a really amazing planning and outreach effort in a very short time. You know, 547 00:53:50,720 --> 00:54:02,620 doing a survey that focuses on a town of 800 and some people and getting 780 responses is pretty good 548 00:54:02,620 --> 00:54:03,560 in my opinion. 549 00:54:06,020 --> 00:54:13,060 I did want to start with the question of my own, and that is that there 550 00:54:13,060 --> 00:54:21,620 seems to be some perception, not a lot, but some, that doing this planning effort around 551 00:54:21,620 --> 00:54:30,920 a geyserville station somehow indicates a prioritization of geyserville over Cloverdale 552 00:54:30,920 --> 00:54:33,500 or other parts of the system. 553 00:54:34,360 --> 00:54:36,960 And I'm just wondering if we could address that right up front. 554 00:54:41,170 --> 00:54:44,310 This actually helps Clover Dell very much. 555 00:54:45,030 --> 00:54:47,470 You know, I explain this at the community meeting, 556 00:54:47,890 --> 00:54:50,150 and I think most people understood it very clearly. 557 00:54:51,090 --> 00:54:53,390 Anytime that you go and try to get a grant 558 00:54:53,390 --> 00:54:56,610 for an 18-mile segment, that's a heavy lift, 559 00:54:57,670 --> 00:54:59,570 there's a, that's a tall border. 560 00:54:59,570 --> 00:54:59,970 And... 561 00:55:00,000 --> 00:55:14,200 Very difficult to get. What bringing in a Guiderville station does is allows us to segment this project, which means we can get from Hillsborough to Guiderville and then we can go seek the funding to complete the project to get to Cloverdale. 562 00:55:14,960 --> 00:55:23,780 So I think that adding Guiderville is a huge help to Cloverdale and is ultimately a big part of our strategy to complete this project. 563 00:55:25,400 --> 00:55:26,440 Thank you. 564 00:55:28,120 --> 00:55:29,240 Just put it even simpler. 565 00:55:29,740 --> 00:55:32,500 You can't get to Cloverdale without going through a crisis, though. 566 00:55:33,520 --> 00:55:34,380 That's fact. 567 00:55:35,980 --> 00:55:38,040 At least not if you go in from South to North. 568 00:55:38,740 --> 00:55:39,000 All right. 569 00:55:39,540 --> 00:55:42,720 We'll go to Board questions on this item. 570 00:55:44,060 --> 00:55:44,640 Any questions? 571 00:55:45,600 --> 00:55:46,060 Coach Keller. 572 00:55:47,000 --> 00:55:47,560 Thank you. 573 00:55:48,280 --> 00:55:53,180 It's been fascinating to really see this process unfold 574 00:55:53,180 --> 00:55:56,360 And I used to be a planning commissioner for 575 00:55:56,360 --> 00:56:00,840 Sonoma County that included the area representing that area that included guys areville. 576 00:56:01,100 --> 00:56:04,780 So I feel like compared to most people, I thought it guys were like I tend to 577 00:56:04,780 --> 00:56:09,520 know a little bit more about what the full of the community has never have 578 00:56:09,520 --> 00:56:14,360 I seen this many people in guysville all mostly overwhelmingly agree on something 579 00:56:14,360 --> 00:56:17,680 which is really interesting. I mean, I think the same thing could be said for 580 00:56:17,680 --> 00:56:21,740 any community, right? When you put out, you know, how many options and 581 00:56:21,740 --> 00:56:27,520 people are like there's just no consensus. So this is wild to see and wonderful and heartwarming. 582 00:56:27,920 --> 00:56:32,800 I did have a question about the station location and some issues that have come up historically 583 00:56:32,800 --> 00:56:39,080 about flooding in that area and how if that is something that has come up in the conversations you 584 00:56:39,080 --> 00:56:44,920 had with guys or residents, I see Eddie also grab expert's phone and just what type of evaluation 585 00:56:44,920 --> 00:56:50,660 would need to take place based on the likelihood that flooding would occur there and what we would 586 00:56:50,660 --> 00:56:56,200 to do about it to ensure that the train can still pass through when those conditions are happening. 587 00:56:57,100 --> 00:57:02,200 Yes, that did come up at the community meeting. It's several people that talked to me. We had a map 588 00:57:02,200 --> 00:57:08,540 up, you know, one of the boards, so they were actually able to show me exactly what happens and how the 589 00:57:08,540 --> 00:57:14,020 water backs up. And so yeah, we did have some of our engineering team there to talk through that. Obviously, 590 00:57:14,200 --> 00:57:20,640 we would have to look at how the hydrology and things like that work in the area to make decision 591 00:57:20,640 --> 00:57:22,320 and so we move forward that project, 592 00:57:22,920 --> 00:57:24,820 but that would definitely be part of it. 593 00:57:26,310 --> 00:57:30,070 Is it possible that when, if we are to move forward with this 594 00:57:30,070 --> 00:57:31,410 and when construction's happening, 595 00:57:31,670 --> 00:57:33,910 that it could be a net benefit to the community 596 00:57:33,910 --> 00:57:37,270 because ideally we're not gonna be placing a platform 597 00:57:37,270 --> 00:57:41,130 without looking at opportunities to ensure 598 00:57:41,130 --> 00:57:44,710 that water is able to kind of move more freely in that area. 599 00:57:44,830 --> 00:57:46,530 And so that should we proceed, 600 00:57:47,210 --> 00:57:48,930 there could be a reduction in some of the flooding 601 00:57:48,930 --> 00:57:51,690 if we can maintain or improve some of those 602 00:57:51,690 --> 00:57:53,310 the infrastructure that's there. 603 00:57:53,530 --> 00:57:56,370 Right. Yeah, I definitely think there would have to be some level of improvement. 604 00:57:56,530 --> 00:58:00,710 I don't know exactly what would be done until we get in there and study it, but according 605 00:58:00,710 --> 00:58:04,530 to the local residents, they were telling me that when it's really bad, the water goes 606 00:58:04,530 --> 00:58:08,970 all the way up to the rail. So if that's the case, that's something that we would definitely 607 00:58:08,970 --> 00:58:13,150 be looking at and trying to manage. And so yeah, we just have to get in there and as a part 608 00:58:13,150 --> 00:58:16,850 of the project, that'll be something that we will look at and do our best to manage that. 609 00:58:18,570 --> 00:58:24,790 And then has there been a conversation, I know in addition to some of the work travel and 610 00:58:24,790 --> 00:58:28,890 travel habits and where people are coming from that you mentioned in your comments, 611 00:58:29,250 --> 00:58:34,450 has there been a conversation with the tribe that operates the casino that's expanding 612 00:58:34,450 --> 00:58:39,870 up there just in terms of the number of buses that they're currently running to the casino 613 00:58:39,870 --> 00:58:45,150 from all over the Bay Area and if there is an opportunity to get those, you know, should the 614 00:58:45,150 --> 00:58:52,150 come to town if get those buses off the 101 and potentially have writers using smart to visit there. 615 00:58:52,590 --> 00:58:59,870 Yes, Zoe and I did go meet with the folks from the tribe. We had a really good conversation. 616 00:59:00,310 --> 00:59:05,750 They did tell us that they were very supportive of a guy's civil station and went on to tell 617 00:59:05,750 --> 00:59:11,830 us that they plan on running bus service whenever Hillsford goes in and planning to connect Hillsford 618 00:59:11,830 --> 00:59:16,670 to the casino and so that's kind of in their thought process and they would want to think 619 00:59:16,670 --> 00:59:21,030 about first and last mile connection from a guy's ofville station to their casino. 620 00:59:21,490 --> 00:59:25,670 So, yeah, that was, we did reach out, we did have a great, really great conversation 621 00:59:28,750 --> 00:59:29,250 with them. 622 00:59:29,430 --> 00:59:30,050 Thank you. 623 00:59:32,690 --> 00:59:32,910 Thank you. 624 00:59:32,910 --> 00:59:33,770 Yeah, thank you very much. 625 00:59:33,770 --> 00:59:37,850 Sorry, thank you so much for the great and thorough presentation, very much appreciate 626 00:59:37,850 --> 00:59:38,570 that. 627 00:59:40,710 --> 00:59:45,270 And what's the, I know it's in the staff report, but the distance between the two points 628 00:59:45,270 --> 00:59:52,870 Um, again, guys or bills right in the middle, and uh, I'm tip my card earlier. I'm totally supportive. 629 00:59:53,250 --> 00:59:57,310 I know I have residents in the Pengrove that would love a station there. 630 00:59:57,490 --> 00:59:59,550 A little more difficult to put a station within. 631 01:00:00,000 --> 01:00:13,480 We don't want to, we are more of a commuter rail with some time frames that we're going to have to commit to. Talk about that. This, this particular stop, how that affects the overall trip to Cleverdale. Does it not. 632 01:00:14,480 --> 01:00:20,280 It adds a minute or two, but it stays within the promise that we made to voters way back when. 633 01:00:21,820 --> 01:00:29,000 Given the spacing between the stations, it supports the performance without compromising the 634 01:00:29,000 --> 01:00:34,760 competitiveness of the rail relative to what we're competing against, which are travel times 635 01:00:34,760 --> 01:00:40,020 on the highway. So it allows us to operate effectively without undermining that rail performance. 636 01:00:40,740 --> 01:00:45,880 And just for transparency, could you talk about any additional infrastructure that would be needed 637 01:00:45,880 --> 01:00:50,900 in terms of passing tracks or laying tracks or the rock 638 01:00:52,060 --> 01:00:52,980 with the additional. 639 01:00:53,500 --> 01:00:56,980 That may be all part of the Cloverdale extension anyway, 640 01:00:57,200 --> 01:00:58,920 I'm not sure if guys available 641 01:00:58,920 --> 01:01:02,800 would add any additional pressure in that regard. 642 01:01:05,940 --> 01:01:08,180 So the scope of this project is really focused 643 01:01:08,180 --> 01:01:10,000 on the station platform. 644 01:01:11,980 --> 01:01:15,760 Our environmentally cleared project through, 645 01:01:15,760 --> 01:01:18,620 from Mark's bill, Lark's for to Cloverdale, 646 01:01:19,240 --> 01:01:21,740 includes the kind of track and the signals, 647 01:01:21,860 --> 01:01:24,860 the communications, all of the elements of the track 648 01:01:24,860 --> 01:01:27,740 that would be required to operate to Cloverdale. 649 01:01:28,240 --> 01:01:29,900 The infrastructure that's really needed 650 01:01:29,900 --> 01:01:33,320 to support this service is the station platform. 651 01:01:34,800 --> 01:01:37,720 And because of we're month over month 652 01:01:37,720 --> 01:01:41,720 record setting ridership, and thank you all for that, 653 01:01:43,240 --> 01:01:44,500 would we do anything different 654 01:01:44,500 --> 01:01:48,380 with the this platform as opposed to what the platforms we built in the past 655 01:01:49,560 --> 01:01:55,180 Would it be longer would it be and I know that puts the other platforms in at a different. Yeah, obviously 656 01:01:55,180 --> 01:02:00,200 We take a we take a good look at everything before we build it, but as of right now 657 01:02:00,200 --> 01:02:06,360 I would say that it would look just like the rest of our platforms whether that would be a side platform or a 658 01:02:06,360 --> 01:02:09,460 Center platform. I don't know quite yet. Yeah, we'd have to work through that 659 01:02:09,460 --> 01:02:13,440 But as far as appearance, I think it would look very similar and then I'll just go one step further 660 01:02:13,440 --> 01:02:21,320 You know, in the spacing of the stations, I think it's about eight to nine miles from Hillsburg to Cloverdale. 661 01:02:21,560 --> 01:02:29,460 And this board served me, say, time and time again, but about seven miles in between commuter rail stations is pretty much ideal. 662 01:02:30,260 --> 01:02:33,380 And so that that's right in with that. 663 01:02:33,460 --> 01:02:39,080 It would be a long stretch to go 18 miles from Hillsburg to Cloverdale without a stop. 664 01:02:39,080 --> 01:02:43,500 So, yeah, I think this is, I think this is a good move on multiple times. 665 01:02:43,500 --> 01:02:49,660 I think our conductors would have to be waking at one up to get off the train at the distance. 666 01:02:50,140 --> 01:03:03,600 I appreciate that. And so I don't have to buzz in again, I'll just say I'm supportive and I totally after being in this business now for quite a long time and advocating for many big projects. 667 01:03:03,600 --> 01:03:09,900 I think people have the full sense that there's just money waiting to be grabbed and it's all from one source and that's never true 668 01:03:09,900 --> 01:03:21,820 It is always a battle to cobbled together funds from many different sources and you do that in the best way you can and the best way you can is to start off by being competitive and realistic in what you could achieve 669 01:03:22,460 --> 01:03:27,220 this being the halfway point really cuts the project in two, which is 670 01:03:27,920 --> 01:03:32,820 positive thing and makes getting to Cloverdale that much more realistic, and 671 01:03:32,820 --> 01:03:36,760 that's really for me the most important thing, and you know, again I'll go back 672 01:03:36,760 --> 01:03:42,100 and say, you know, if we knew today what we didn't know way back when when we 673 01:03:42,100 --> 01:03:45,940 were starting this whole thing, would we have additional stops at different places 674 01:03:45,940 --> 01:03:51,800 and probably, and I think this is a good move for smart one that 675 01:03:51,800 --> 01:04:00,800 will be very beneficial to be able to complete what was promised to the voters way back when 676 01:04:00,800 --> 01:04:05,000 and really excited about it. And again, thank you for all the work. Thank you to all staff 677 01:04:05,000 --> 01:04:12,520 for making everything so successful. Any further questions from the board, Director Garberigan? 678 01:04:14,080 --> 01:04:19,120 Comment, Kate and I were over here mumbling about how you well you drilled down into those. 679 01:04:19,120 --> 01:04:23,220 What was it not even 10% of the people that maybe it was fighting? 680 01:04:23,900 --> 01:04:25,820 90% of the people who were unhappy. 681 01:04:26,540 --> 01:04:27,940 And we wish them well. 682 01:04:28,500 --> 01:04:33,620 But now we know what could happen in the future 683 01:04:33,620 --> 01:04:36,260 that we've got a challenge to bring them on board. 684 01:04:36,280 --> 01:04:40,000 The good news is though the lion share are really thrilled. 685 01:04:40,000 --> 01:04:43,180 And I was happy to see there are 700 jobs there 686 01:04:43,180 --> 01:04:45,020 and 600 people live there. 687 01:04:45,240 --> 01:04:47,080 So obviously people are commuting in and out. 688 01:04:47,080 --> 01:04:52,340 this will be a service. And I just echo what everybody else said, but that way your presentation 689 01:04:52,340 --> 01:04:54,220 was delicate. Thank you. 690 01:04:56,780 --> 01:04:58,520 There's a question to come and check the gun. 691 01:04:58,720 --> 01:04:59,980 Maybe just a quick observation we get. 692 01:05:00,000 --> 01:05:09,760 7.4.5% of the ballot box, but about 90% approval in Geiserville. So just a couple months later, I mean, I've already added 15 points that's impressive. 693 01:05:12,260 --> 01:05:13,580 Next time, 110. 694 01:05:15,860 --> 01:05:25,100 All right. Is there no more questions for the board? We will go to the public. Anyone in the room want to comment on this item? Sorry. 695 01:05:25,100 --> 01:05:31,500 Oh, we're going to do this backwards. Okay. Sorry. We're going to go first to online comments. 696 01:05:33,040 --> 01:05:40,240 Just for fun. There you go, Brian. Yeah, we have three hands raised for public comment. First is S. 697 01:05:40,240 --> 01:05:41,640 Thank 698 01:05:45,800 --> 01:06:00,700 you. Susan Kirk's Petalima. I support this extension, this new station, and the new platform 100% and so pleased for the residents of 699 01:06:00,700 --> 01:06:07,980 and for all of the residents in the North County who will eventually, maybe, able to use this, 700 01:06:08,800 --> 01:06:13,880 I appreciated Director Kelly's comments and her experience in that area of the county, 701 01:06:14,460 --> 01:06:20,700 and also Director Rabbits' comments, and I too would love to see a station in Pengrove, 702 01:06:22,120 --> 01:06:27,040 a stop in Pengrove. I know so many people who would really benefit from that. 703 01:06:27,040 --> 01:06:34,800 on having said all of that, I really wish that your board would direct your manager and staff 704 01:06:34,800 --> 01:06:42,360 on certain environmental impact issues such as the hydrology issues and potentially other 705 01:06:42,360 --> 01:06:54,780 issues that really do need engineering, complete evaluation and planning so that the building 706 01:06:54,780 --> 01:07:02,140 of the platform will not be inundated by flooding, and there could be other environmental impacts 707 01:07:02,140 --> 01:07:09,620 as well, but since you're being sent to from Sequa, obviously there are environmental impacts 708 01:07:09,620 --> 01:07:10,700 that need to be evaluated. 709 01:07:10,900 --> 01:07:12,580 And I hope you will support that. 710 01:07:12,580 --> 01:07:13,540 Thank you. 711 01:07:17,140 --> 01:07:18,740 Thank you. 712 01:07:32,820 --> 01:07:33,180 Thank you. 713 01:07:33,680 --> 01:07:34,480 Thank you. 714 01:07:34,480 --> 01:07:34,840 Thank you. 715 01:07:34,840 --> 01:07:38,620 Appreciate your taking this up today. 716 01:07:39,440 --> 01:07:44,220 As many of you know, I've been following this project since its inception. 717 01:07:44,800 --> 01:07:48,660 It's been part of public service in Cloverdale through the planning commission. 718 01:07:48,660 --> 01:08:04,380 and two-time mayor during the inception and the attended many of the events concurrent with all of this whole smart project. 719 01:08:04,760 --> 01:08:12,680 I attended the meeting in Cloverdale because I was very interested in to see how their feeling was. 720 01:08:12,680 --> 01:08:22,380 and it was not surprised to see that it was overwhelmingly accepted and I'm totally in favor of it. 721 01:08:22,500 --> 01:08:27,040 It's to me it's a no-brainer. It makes all of the sense. 722 01:08:30,000 --> 01:08:32,140 It's it's it's got to be a 723 01:08:32,140 --> 01:08:40,520 done deal. So I'm excited for it and hopefully it will get past without a problem. Thank you very much. 724 01:08:42,830 --> 01:08:45,470 next up for public comment is Savannah. 725 01:08:52,830 --> 01:08:55,410 Savannah, please unmute and begin your comment. 726 01:08:55,810 --> 01:09:00,870 So, so I'm not Savannah. I'm actually need a handshot on the director of the 727 01:09:00,870 --> 01:09:07,790 Cloverdale Chamber of Commerce. And we represent about 200 a little more than 220 businesses. 728 01:09:08,390 --> 01:09:11,270 It's small and large in both Cloverdale and Geiserville. 729 01:09:11,750 --> 01:09:14,650 And we've been waiting for the train for a long time. 730 01:09:14,650 --> 01:09:19,590 And I think that the slide that we showed that had shown that 731 01:09:19,590 --> 01:09:23,630 Cloverdale residents weren't as supportive of the station and guys of 732 01:09:23,630 --> 01:09:28,390 real didn't understand how the sectional funding and all of that would 733 01:09:28,390 --> 01:09:31,630 actually make it more realistic to come to Cloverdale. 734 01:09:33,350 --> 01:09:36,250 It was, it's perfect. 735 01:09:36,570 --> 01:09:41,010 Guys of real has lots of dining and hospitality opportunities. 736 01:09:41,010 --> 01:09:46,490 Cloverdale would love to write on the hotels and actually show off what we have here. 737 01:09:47,550 --> 01:09:53,830 The community meeting on August 10th was amazing and one of the, I wanted to start off by saying 738 01:09:53,830 --> 01:09:59,970 the ridership levels that you talked about earlier. Everybody's excited about that and we have 739 01:10:00,000 --> 01:10:07,420 I hope it continues and continues. But I, on behalf of my board and my chamber, we fully support the 740 01:10:07,420 --> 01:10:13,340 training government to close it. Guys are all in then, Cloverdale. So, that was very informative 741 01:10:13,340 --> 01:10:19,040 to learn that that will hopefully make it a little bit easier to come to Cloverdale and make 742 01:10:19,040 --> 01:10:21,120 more sense. So, thank you. 743 01:10:23,740 --> 01:10:28,100 Last hand raise for public comment is Mike Peckner. Go ahead, Mike. 744 01:10:29,340 --> 01:10:36,940 Thank you. Thank you to the board and to Eddie Cummings. I want people to know that we still have 745 01:10:36,940 --> 01:10:47,380 freight service on the smart line and before freight service was ended by floods and debris on 746 01:10:47,380 --> 01:10:54,920 the tracks and February of 1998 that was what's in Pacific railroad ran a train from here to 747 01:10:54,920 --> 01:11:03,040 and Willets south to the connection with the main national railroad network at Shellville. 748 01:11:03,860 --> 01:11:10,300 And that guys areville had a passing track, a 5200 feet, one train ran from Willets to 749 01:11:10,300 --> 01:11:15,940 Geiserville, the other train ran from Shellville to Geiserville. They met in the middle and 750 01:11:15,940 --> 01:11:24,180 the cruise changed engines and went back to their home depots. And I would think that possibly 751 01:11:24,180 --> 01:11:31,620 in the planning that we think of freight service in Guiseville and keeping the 6200 foot 752 01:11:31,620 --> 01:11:41,160 siding that is there now for logistics purposes and that we have a center platform instead 753 01:11:41,160 --> 01:11:51,080 of a side platform and of course make sure that we have gauntlet tracks at Guiseville so that 754 01:11:51,080 --> 01:11:56,040 can continue the freight service to the north. I'm fully in favor of a 755 01:11:56,040 --> 01:12:01,340 guys reveal station. I think it's exciting and it's glad I'm happy to see it 756 01:12:01,340 --> 01:12:05,320 happened. Just want to make sure that freight services considered through 757 01:12:05,320 --> 01:12:11,320 guys reveal as well. There are three lumber companies in Cloverdale that 758 01:12:11,320 --> 01:12:19,240 used to be railroad serviced and would certainly go back to using the freight 759 01:12:19,240 --> 01:12:21,680 instead of trucking. Thank you. 760 01:12:25,280 --> 01:12:27,880 That's the last of the online portion of public on it. 761 01:12:28,740 --> 01:12:34,900 All right. For the folks in the room, thanks for your patience. I'd like to address the board on this 762 01:12:34,900 --> 01:12:36,740 item. Please come to the podium. 763 01:12:45,900 --> 01:12:49,000 Good afternoon. My name is Bryce Jones. I am president of the 764 01:12:49,000 --> 01:12:55,120 guys of all planning committee. First off, I'd like to thank staff for the amazing outreach they did. 765 01:12:55,120 --> 01:12:59,860 was really a huge amount of engagement within the community. 766 01:13:00,380 --> 01:13:02,800 We were pleased to be able to help share the survey. 767 01:13:03,240 --> 01:13:07,060 Really, really impressed with the number of respondents to it. 768 01:13:08,160 --> 01:13:15,020 Also, we wanted to comment today on the potential impact of a train station in Guiseville. 769 01:13:15,440 --> 01:13:20,040 For those of you who don't know, we'll redwood highway used to run right through downtown 770 01:13:20,040 --> 01:13:22,180 and when the highway bypassed Guiseville. 771 01:13:22,180 --> 01:13:25,780 a lot of the economy ended up bypassing our community as well. 772 01:13:26,220 --> 01:13:30,260 If you saw the news coverage from one of the San Francisco news stations, 773 01:13:30,720 --> 01:13:34,160 a lot of our business owners commented that they love to have a station there 774 01:13:34,160 --> 01:13:36,600 because it might bring more people in. 775 01:13:37,120 --> 01:13:41,980 And the news coverage is another great example of the potential impact of a smart station. 776 01:13:42,860 --> 01:13:46,140 Guys, your vote was in the news more in the last six weeks 777 01:13:46,140 --> 01:13:49,440 than it probably has been in the last 16 years. 778 01:13:49,440 --> 01:13:54,660 So, it was really impressive to see all the newspapers basically from the San Francisco 779 01:13:54,660 --> 01:13:59,120 Chronicle, all the way to Cleverdale, cover this and cover it prominently. 780 01:13:59,860 --> 01:14:04,240 So, it really does show you the potential impact of this station coming to town. 781 01:14:04,900 --> 01:14:07,060 We love seeing these statistics on the workers. 782 01:14:07,320 --> 01:14:09,020 We do have a shortage of housing. 783 01:14:09,640 --> 01:14:13,380 A lot of people work the jobs and guys will do commute to town, so this could create 784 01:14:13,380 --> 01:14:15,980 another opportunity for them. 785 01:14:15,980 --> 01:14:24,060 Love the comment that you guys outreached in the casino, they are partnering with Caesar's to develop the casino quite a bit. 786 01:14:24,380 --> 01:14:26,780 So there's a lot more potential with that as well. 787 01:14:27,760 --> 01:14:30,860 I can comment a little bit on the drainage comments. 788 01:14:31,720 --> 01:14:36,180 So once again, I am president of the guysville planning committee, one of two committees in town. 789 01:14:36,600 --> 01:14:44,020 We do have the guysville and Alexander Valley Municipal Advisory Committee, and they have done a drainage study already for that area with 790 01:14:44,020 --> 01:14:46,720 with Sonoma County Department of Transportation. 791 01:14:47,260 --> 01:14:49,460 So a lot of that study and work has already been done, 792 01:14:49,560 --> 01:14:51,360 and a lot of that expense has already been spent. 793 01:14:51,980 --> 01:14:52,860 Thank you. 794 01:14:55,400 --> 01:14:56,060 Anyone else? 795 01:15:03,090 --> 01:15:13,410 Thank you. I did the injuries by myself last time, Thomas Ells, and I'm a civil and environmental engineer. I've done a lot of railwork and a lot of hydrology. 796 01:15:14,030 --> 01:15:32,770 And if the water, a lot of times people have a pretty good idea of what's happening out there. But if it's reaching the rail, okay, it's a problem for the subgrade, but it's not a problem for the track or the people because your platform is 40 inches above the top of rail. 797 01:15:32,770 --> 01:15:47,570 So you've got quite a bit of clearance from any water or interference, and trains can usually navigate through significant depths of water as long as it's not flowing, but it's a river that you're going through that's a problem. 798 01:15:48,950 --> 01:15:58,770 But I was at that meeting and it was extremely supportive on extremely supportive of this, there was a person who was there who said, oh, this is a big expense and whatever. 799 01:15:58,770 --> 01:16:05,250 The problem is, as Supervisor Abbott or Board Member Abbott said, is that this was a promise. 800 01:16:06,530 --> 01:16:07,950 People would not vote. 801 01:16:08,310 --> 01:16:13,770 When we went for the election, people would not vote for this, if we didn't commit to 802 01:16:13,770 --> 01:16:21,410 going to Colbert L, wherever they were, in Moran, they were against us if we didn't commit 803 01:16:21,410 --> 01:16:21,850 to going. 804 01:16:22,770 --> 01:16:26,670 I mean, they wanted to commit every single word that was in there, including the trail and 805 01:16:26,670 --> 01:16:26,870 everything. 806 01:16:26,870 --> 01:16:31,690 And that's why I was saying the board was so effective in doing that in preparation for the 807 01:16:31,690 --> 01:16:32,010 election. 808 01:16:32,230 --> 01:16:33,450 But this is all part of that. 809 01:16:33,450 --> 01:16:34,610 This is all part of that. 810 01:16:34,610 --> 01:16:40,350 An original commitment from the Council of Study and everything going forward, it's very 811 01:16:40,350 --> 01:16:40,830 necessary. 812 01:16:41,230 --> 01:16:45,690 And I would point out that it's possible to use other equipment. 813 01:16:46,090 --> 01:16:53,970 Your equipment is very vital and it's complicated and difficult to reproduce what we have. 814 01:16:53,970 --> 01:17:02,670 You could use other equipment because that, that leg is going to take a great deal of time and not carry very many people. 815 01:17:04,050 --> 01:17:09,970 So you could use other equipment on that and then focus the equipment you have on the segments that you have. 816 01:17:10,970 --> 01:17:14,190 Thank you to that's a possibility. Thank you. Next time. 817 01:17:14,870 --> 01:17:17,870 Anyone else in the room want to comment on this item? 818 01:17:19,290 --> 01:17:23,130 Is there any final comments or questions from board members or emotion? 819 01:17:26,340 --> 01:17:32,120 Thank you, Chair Crossey, and thank you for the presentation and to the members of the 820 01:17:32,120 --> 01:17:36,240 Guyserville community who have participated in the process as well as folks from 821 01:17:36,240 --> 01:17:43,000 Kloberdale who have engaged. This is really as Christione's both the chair of the planning 822 01:17:43,000 --> 01:17:47,060 committee, but also the Chief True Reading Officer of the City of Guyserville. 823 01:17:51,100 --> 01:17:51,700 Chief 824 01:17:51,700 --> 01:17:57,260 and truly to have this many, this much interest in this many eyeballs on 825 01:17:57,260 --> 01:18:01,840 guyserville makes me so proud as a nearby resident but also as just as 826 01:18:01,840 --> 01:18:07,120 someone who has a lot of hope and aspiration for that community. There's so 827 01:18:07,120 --> 01:18:11,860 much love and pride in guyserville, people who are from there who live there. I mean 828 01:18:11,860 --> 01:18:16,160 like any part of Sonoma County I would say but really it is a unique community that 829 01:18:16,160 --> 01:18:23,960 very tight knit. Here is deeply about one another and the young people who are being raised 830 01:18:23,960 --> 01:18:28,800 and growing up in the schools there. The conversations I have had with kids about their desire 831 01:18:28,800 --> 01:18:34,960 to travel to other parts of the region to go to educational opportunities that SRJC, 832 01:18:35,120 --> 01:18:40,420 which there are already doing now if they can get on the Sonoma County Transit Bus. To get there, 833 01:18:40,820 --> 01:18:45,320 this has really opened up a lot of people's eyes and hearts to the idea of having a better 834 01:18:45,320 --> 01:18:47,380 more connected in order to know my county. 835 01:18:47,860 --> 01:18:51,360 And what you may not know is actually the route bus, 836 01:18:51,360 --> 01:18:54,200 the snowing honey transit bus that travels from Santa Rosa up 837 01:18:54,200 --> 01:18:57,340 to Culverdale that stops and guys reveal is the most heavily 838 01:18:57,340 --> 01:19:00,640 utilized bus in snowing county transit circulation. 839 01:19:01,460 --> 01:19:03,980 There are a lot of people who rely on public transit 840 01:19:03,980 --> 01:19:07,260 to get around this region and the people that are waiting 841 01:19:07,260 --> 01:19:09,880 for that bus and how often they have to wait 842 01:19:09,880 --> 01:19:12,420 in between buses are really delighted and excited 843 01:19:12,420 --> 01:19:14,700 about this opportunity to have a train 844 01:19:14,700 --> 01:19:18,820 that sort of is a community not just for the folks who are living in other parts of the county, 845 01:19:19,100 --> 01:19:21,920 commuting to guys are built for work, which is about a thousand people a day, 846 01:19:22,180 --> 01:19:25,580 but also the folks living in guys are built who would like to commute elsewhere 847 01:19:25,580 --> 01:19:33,800 in and around the region and the doors and the visibility of what this will open up for those opportunities for people in the community, 848 01:19:33,900 --> 01:19:40,800 as well as the number of seniors in guys are built who are very much excited about having the train to get to places 849 01:19:40,800 --> 01:19:44,540 because the only way to get around right now is pretty limited. 850 01:19:46,100 --> 01:19:51,000 In addition, I know comments were made about the River Raccocino partnering with 851 01:19:51,000 --> 01:19:57,820 Caesars and International Entertainment Group. They're the expansion at the River Raccocino. 852 01:19:57,980 --> 01:19:59,800 We'll certainly have an impact in the community. 853 01:20:00,560 --> 01:20:16,440 There's a lot of people who have feelings about it. But what I will say is that it's happening, they broke around over a year ago or about a year ago, and they're adding a 100 room luxury host hell and spa resort as part of the casino that they're also expanding. 854 01:20:16,660 --> 01:20:28,220 And so the number of people who will be visiting there and the impact that we'll have in the community, I think, positively economically, but this train will help to mitigate some of the negative impacts in the community. 855 01:20:28,220 --> 01:20:38,820 you may talk to farmers in Alexander Valley who say that the buses every single day, you know, driving up and down their small highway to get to the casino really does have an impact. 856 01:20:39,400 --> 01:20:50,000 And so the idea that this would lessen some of that impact and provide economic benefit to the community without some of the environmental impacts certainly is is interesting and and worth consideration. 857 01:20:50,000 --> 01:20:54,140 So I want to pull hard at least support this expansion. 858 01:20:54,400 --> 01:20:59,300 I think that it really will be such a net positive for the entire Northern 859 01:20:59,300 --> 01:21:02,620 Stromo County community as well as for the entire system. 860 01:21:03,040 --> 01:21:03,700 So thank you. 861 01:21:05,740 --> 01:21:06,460 President questions. 862 01:21:07,180 --> 01:21:07,780 Comment. 863 01:21:10,930 --> 01:21:17,490 Just carrying this is one motion encompassing all three parts of the action. 864 01:21:17,630 --> 01:21:18,670 It is one motion. 865 01:21:18,850 --> 01:21:20,050 I've put that in your chair notes. 866 01:21:20,390 --> 01:21:21,950 Chair, of course, I'd be happy to make motion. 867 01:21:21,950 --> 01:21:26,470 Well, second. I move that the Board of Directors of the snowman county, 868 01:21:26,950 --> 01:21:31,210 some of a ring area rail transit district adopt a guiseville station into 869 01:21:31,210 --> 01:21:34,330 smarts program and improving up the project. 870 01:21:35,030 --> 01:21:41,970 Yeah, motion in a second. I think this is a good one to individually vote on. 871 01:21:42,010 --> 01:21:44,730 Irene, can you call the roll? Of course. 872 01:21:50,080 --> 01:21:51,920 Do I work for Catertonson? Yes. 873 01:21:51,920 --> 01:21:56,440 Director Colin, hi, Director Fleming. 874 01:21:57,300 --> 01:22:01,320 Yes, Director Garboreno, Director Jacob's absent. 875 01:22:01,820 --> 01:22:02,660 Director Kelly. 876 01:22:03,740 --> 01:22:04,700 Director Lukeins. 877 01:22:05,140 --> 01:22:05,400 Yes. 878 01:22:05,780 --> 01:22:06,700 Director Par. 879 01:22:07,200 --> 01:22:07,520 Yes. 880 01:22:08,040 --> 01:22:09,160 Director Paulson. 881 01:22:09,240 --> 01:22:09,500 Yes. 882 01:22:09,940 --> 01:22:10,840 Director Rabbit. 883 01:22:11,020 --> 01:22:11,380 Hi. 884 01:22:11,860 --> 01:22:12,940 Vice Chair Sackett. 885 01:22:14,100 --> 01:22:15,000 And Chair Corsi. 886 01:22:15,660 --> 01:22:15,960 Yes. 887 01:22:16,480 --> 01:22:17,080 Thank you. 888 01:22:17,080 --> 01:22:21,580 if it's called positive votes from those present. 889 01:22:28,660 --> 01:22:30,760 And we're not done yet. 890 01:22:31,200 --> 01:22:33,760 Mr. Gamlin, I have a number eight. 891 01:22:35,810 --> 01:22:37,150 Yes, I have number eight. 892 01:22:37,870 --> 01:22:41,270 This item is a recommendation for a construction contract 893 01:22:41,270 --> 01:22:43,950 to do some repair work on the existing railroad. 894 01:22:46,420 --> 01:22:47,700 So to orient you a little bit, 895 01:22:48,300 --> 01:22:50,740 this is down with the area we call St. Vincent 896 01:22:50,740 --> 01:22:57,140 It's behind St. Vincent's church, this area between San Rafael and Nevada, so left side of 897 01:22:57,140 --> 01:23:03,840 your screen is Highway 101, north is to the top. The marine wood area is to the left of 101. 898 01:23:05,160 --> 01:23:10,100 St. Vincent's church there is towards the right and the reddish line with the blue 899 01:23:10,100 --> 01:23:16,680 polka dots is our railroad, the blue dots being mile post markers. So I've identified two locations 900 01:23:16,680 --> 01:23:23,360 there where we have some box culverts in the right away that are settling and I'll drill 901 01:23:23,360 --> 01:23:28,380 into that a little bit. We've had settlement in the railroad in this area. We have these box 902 01:23:28,380 --> 01:23:33,820 culverts that are pairs. So two locations, each with two box culverts, there are a series of 903 01:23:33,820 --> 01:23:39,440 concrete structures put together to convey drainage. They're failing the seams are opening on them a 904 01:23:39,440 --> 01:23:44,640 little bit and see it in this photo here where we've got some ballast and gravel falling through 905 01:23:44,640 --> 01:23:57,640 So seems this project will put rebar in here, fillies with concrete, we will be putting a pipe through each one, so we maintain some drainage capacity and just solidifying them essentially. 906 01:24:00,220 --> 01:24:04,240 We did a competitive procurement for this contract. We received three bids. 907 01:24:04,240 --> 01:24:11,620 Joladi Brothers Incorporated was deemed the lowest responsive responsible bidder if you adopt 908 01:24:11,620 --> 01:24:18,020 resolution 2026-27 that would authorize the general manager to execute a contract which 909 01:24:18,020 --> 01:24:27,510 Joladi Brothers contract CVBB26-004 in amount of 272,869 dollars. 910 01:24:28,200 --> 01:24:29,980 I'm happy to answer any questions. 911 01:24:31,380 --> 01:24:32,180 Thank you, Mr. Yamlin. 912 01:24:33,120 --> 01:24:33,380 Questions? 913 01:24:36,200 --> 01:24:37,240 Thank you. 914 01:24:37,460 --> 01:24:40,240 Supervisor Sack and I might have the same questions or similar questions. 915 01:24:40,500 --> 01:24:44,240 So I'm curious if you have had outreach to the other property owners in that area 916 01:24:44,240 --> 01:24:48,940 because whenever there's flooding or we're moving around dirt there can be both intended 917 01:24:48,940 --> 01:24:54,220 and intended consequences one and two just letting them know the work that we're going to be doing this 918 01:24:54,220 --> 01:24:54,800 process. 919 01:24:54,900 --> 01:24:55,720 Yes, we have. 920 01:24:55,740 --> 01:24:57,520 We primarily outreach with the church. 921 01:24:57,740 --> 01:24:58,860 We have contacts there. 922 01:24:59,220 --> 01:24:59,960 We frequently act. 923 01:25:00,000 --> 01:25:11,000 Access the railroad crossing there, through their property. We did find that these culverts were drastically oversized, and the drainage that goes through, or it's not that significant at all. 924 01:25:11,600 --> 01:25:13,000 Okay, great. Thank you. 925 01:25:14,100 --> 01:25:26,980 I have two questions. The first one, we talked about earlier today, a $4.5 million Tam application for O-Bake funding for the pathway in this area. 926 01:25:26,980 --> 01:25:30,980 And so how are you thinking about these culverts with that construction? 927 01:25:31,800 --> 01:25:35,100 Does this need to happen right now before that? 928 01:25:35,860 --> 01:25:38,240 This has been something we've been monitoring for a while. 929 01:25:38,400 --> 01:25:40,380 So we really should address the settlement piece. 930 01:25:40,560 --> 01:25:42,820 The two are really separated in this area. 931 01:25:43,020 --> 01:25:47,720 The pathway will be on an engagement easement that we secured some time ago. 932 01:25:48,100 --> 01:25:50,800 That's parallel to the right away in the field. 933 01:25:51,220 --> 01:25:54,400 I guess that's south east of the railroad. 934 01:25:54,400 --> 01:25:57,680 It won't be on the same prism in this area. 935 01:25:58,260 --> 01:25:59,480 Yeah, they're not really related. 936 01:26:00,760 --> 01:26:07,760 And then the other question is, you're talking about decreasing drastically the size of the 937 01:26:07,760 --> 01:26:10,400 covert, feeling that it was over size. 938 01:26:11,700 --> 01:26:16,600 Yeah, we'll be maintaining drainage through there with 24-inch pipes, 24-inch diameter pipes, 939 01:26:16,780 --> 01:26:19,980 so still sizeable amount, but smaller than what's there today. 940 01:26:19,980 --> 01:26:26,200 And would that change at all if there was development on the church side of this property? 941 01:26:26,900 --> 01:26:35,820 It seems like it's probably far enough away, but just wanted to see if you're taking that into consideration of how much size you need. 942 01:26:36,020 --> 01:26:36,300 Sure. 943 01:26:36,820 --> 01:26:46,340 We're not taking in any development consideration, but we are certainly taking in the consideration for all the runoff and the hillside and everything in that area that we pick up. 944 01:26:46,340 --> 01:26:59,700 So if there's any concentrated runoff from a development, they have the responsibility to handle their own water, but we would certainly coordinate with them if they had a need to channel some water or something in the future. 945 01:27:01,000 --> 01:27:01,320 Thank you. 946 01:27:03,390 --> 01:27:05,370 Other questions for Bill? 947 01:27:06,530 --> 01:27:13,110 Not seeing any public comment in the room in the online. 948 01:27:14,890 --> 01:27:17,450 All right, we'll look for a motion on number eight. 949 01:27:17,450 --> 01:27:19,570 So moved 950 01:27:22,800 --> 01:27:26,160 by Director Colin and seconded by Director Fleming. 951 01:27:26,960 --> 01:27:27,940 Thank you. 952 01:27:28,140 --> 01:27:30,280 Well, and all in favor, we'll say aye. 953 01:27:30,280 --> 01:27:30,540 Aye. 954 01:27:31,480 --> 01:27:32,200 Any opposed? 955 01:27:33,040 --> 01:27:33,160 Seeing? 956 01:27:33,920 --> 01:27:34,080 Right. 957 01:27:34,420 --> 01:27:35,200 That's the unanimously. 958 01:27:38,240 --> 01:27:39,840 Bill's going to steer right there. 959 01:27:39,980 --> 01:27:42,480 And we're going to go through items nine. 960 01:27:43,240 --> 01:27:45,980 Ten and eleven with a power point. 961 01:27:45,980 --> 01:27:52,460 And then we'll have individual votes on those after the PowerPoint presentation. 962 01:27:59,610 --> 01:28:00,570 Here we go. 963 01:28:05,700 --> 01:28:06,320 There we go. 964 01:28:06,860 --> 01:28:10,660 Okay, as Director, of course he said, this will be items 9 through 11. 965 01:28:12,120 --> 01:28:19,060 And this pertains to incorporating some work from our municipal partners into our Healdsburg extension project. 966 01:28:19,060 --> 01:28:26,500 As you may recall, you authorized a contractor award in September last year for a progressive 967 01:28:26,500 --> 01:28:29,360 design-build contract for the Healdsburg extension. 968 01:28:29,700 --> 01:28:36,700 Quick refresher on progressive design build in this effort, smart hires a contractor with 969 01:28:36,700 --> 01:28:38,340 a very little project definition. 970 01:28:38,900 --> 01:28:43,840 We work with the contractor and his engineering team to develop the engineering documents. 971 01:28:43,840 --> 01:28:50,100 we then get into open book cost negotiations and if all goes well and we agree on a price, 972 01:28:50,280 --> 01:28:55,320 we move into a phase two contract which would complete design and construct the work. 973 01:28:55,680 --> 01:29:00,940 Sometimes we'll do a couple phase two contracts depending on how the project's 974 01:29:00,940 --> 01:29:06,080 flowing and how it's being implemented. We're currently developing design. We've conducted field 975 01:29:06,080 --> 01:29:11,640 work, field surveys, we're incorporating that information. As part of that, our municipal partners, 976 01:29:11,640 --> 01:29:17,520 the city of Healdsburg and Sonoma County, have both asked us to incorporate some work into 977 01:29:17,520 --> 01:29:18,800 the project. 978 01:29:22,100 --> 01:29:26,780 In terms of Healdsburg, they requested us to add three items, so it would be a 979 01:29:26,780 --> 01:29:34,000 sewer line design across the smart property near the depot. It would be to include a sleeve, 980 01:29:34,340 --> 01:29:39,520 for a future utility crossing at Front Street, essentially a pipe that you could slip a water line 981 01:29:39,520 --> 01:29:45,420 a sewer line through and then designing some brackets on the Russian River Bridge for a 982 01:29:45,420 --> 01:29:51,320 possible future water line. This would take this work, this contract would take this work 983 01:29:51,320 --> 01:29:56,960 to a 65% design level that's consistent with the milestones that we're designing the project 984 01:29:56,960 --> 01:29:59,960 for our work, the cost of this is a hundred and... 985 01:30:00,000 --> 01:30:11,500 4141,285 dollars and 61 cents, and would be funded by Cloverd, sorry, city of Hieldsburg, which is item nine in the packet. 986 01:30:11,780 --> 01:30:13,380 That's the funding agreement itself. 987 01:30:16,110 --> 01:30:26,370 Worked for the county of Sonoma, we will be replacing the bridge over old redwood highway and adding a pedestrian bridge, adjacent to it for the bicycle and pedestrian pathway. 988 01:30:27,050 --> 01:30:32,470 Sonoma County has asked us to start doing some design work to widen this section of roadway. 989 01:30:32,730 --> 01:30:39,070 As you can see in the photo there, it necks down at the railroad bridge, so this is a great opportunity to complete this work. 990 01:30:39,370 --> 01:30:44,850 It would add shoulders, bike lanes to the roadway, increase the line of sight on the curve there. 991 01:30:45,330 --> 01:30:55,290 And again, this work would be designed to a 65% design level consistent with our work, the cost of 640,000, 375 dollars and 27 cents. 992 01:30:55,290 --> 01:31:00,950 And this item is covered in the county funding agreement, which is item 10 in your packet. 993 01:31:04,300 --> 01:31:09,560 So all this would feed into a contract amendment with our progressive design built contract. 994 01:31:09,820 --> 01:31:13,980 Contract CVDB-25-001. 995 01:31:13,980 --> 01:31:20,260 The total amendment amount on this first phase would be $751,771. 996 01:31:20,260 --> 01:31:31,460 and 28 cents were a total not to exceed contract of $22,566,169.82 cents. It would incorporate 997 01:31:31,460 --> 01:31:37,700 the cities and the counties utility and roadway design work all funded by the city and the 998 01:31:37,700 --> 01:31:43,580 county. Quite frankly, these are great opportunities to combine work like this. It usually 999 01:31:43,580 --> 01:31:48,760 everybody benefits from economies of scale and it minimizes impacts to the public. So we've done 1000 01:31:48,760 --> 01:31:55,100 lot of it up and down the right of ways we've rebuilt the railroad. So in summary, three resolutions, 1001 01:31:55,440 --> 01:32:00,680 the first one item nine is the City of Hillsburg funding agreement, then item 10 is the county 1002 01:32:00,680 --> 01:32:06,560 of Sonoma funding agreement, and then finally item 11 is the actual amendment to the contract itself. 1003 01:32:07,160 --> 01:32:15,780 I'm happy to answer any questions. Thank you, Bill. Questions on 910 and 11 of the board, 1004 01:32:16,820 --> 01:32:18,120 You're one, George Kelly. 1005 01:32:18,920 --> 01:32:26,040 For the snowman county work that's happening outside of the city to widen, to evaluate, essentially, why, and that bridge. 1006 01:32:26,260 --> 01:32:31,400 Do we already know that it's feasible to be able to do that work or we're still evaluating? 1007 01:32:32,640 --> 01:32:35,540 No, we've identified that it's feasible to do. 1008 01:32:35,600 --> 01:32:40,160 We've looked at a longer bridge length there for the railroad that opens up the roadway. 1009 01:32:40,280 --> 01:32:44,400 We've looked at the retaining walls that would be needed there, so yeah, we've determined it's feasible. 1010 01:32:44,400 --> 01:33:07,520 Okay, great. Yeah, I think that in both of these instances, I mean, for just some local context on the Hillsburg Bridge utility work and extending utilities, there's about a 275 to 200 acres of the city of Hillsburg that is south of the bridge south of the river that has no utilities whatsoever that is a part of an area planning effort that's underway. 1011 01:33:07,520 --> 01:33:36,920 So those in town within the city limit acres, if the city has the ability to leverage smart infrastructure to do this utility work, bringing utilities to that 200 acres of land, it will greatly increase the potential of both residential commercial and industrial development in that area right now that's served by limited septic and wells and so it's really a great opportunity and something the city has been talking about for at least a hundred years. 1012 01:33:36,920 --> 01:33:42,660 So it's exciting to see smart coming to town being one of those things that's helping make it happen. 1013 01:33:43,160 --> 01:33:51,070 And this area of roadway in the county where the bridge widening is taking place is a very dangerous area at a intersection in 1014 01:33:51,070 --> 01:33:58,090 It shouldn't kind of J-Winery where Rodney Strongwinery is at the intersection of East Side Road and the old Red. 1015 01:33:58,630 --> 01:34:06,210 And it is very narrow bicyclists and pedestrians are risking their lives just getting through that under that bridge. 1016 01:34:06,470 --> 01:34:09,230 And it comes right up on a really fast moving intersection. 1017 01:34:09,930 --> 01:34:14,330 So this will be a really much needed benefit to that area. 1018 01:34:14,450 --> 01:34:16,050 That has a lot of traffic. 1019 01:34:17,870 --> 01:34:19,370 Other questions for Bill? 1020 01:34:21,830 --> 01:34:28,690 All right, we're going to do public comment on all three of these down, or do we have to take that set? 1021 01:34:28,930 --> 01:34:31,830 We should take public comment on each individual one. 1022 01:34:31,910 --> 01:34:33,310 All right, team, sure. 1023 01:34:33,650 --> 01:34:36,990 Start with public comment on number nine. 1024 01:34:37,350 --> 01:34:38,830 Name of anyone in the room. 1025 01:34:40,070 --> 01:34:40,790 Anyone online? 1026 01:34:44,340 --> 01:34:45,540 I have one more question on this bill. 1027 01:34:45,700 --> 01:34:48,820 Was that first slide, was that a turn table in that picture? 1028 01:34:49,480 --> 01:34:50,220 Yes, excellent. 1029 01:34:50,220 --> 01:34:51,620 and I direct a course. 1030 01:34:52,020 --> 01:34:54,120 That is the old turn table up in Healt's firm. 1031 01:34:54,680 --> 01:34:56,060 It's still up there. 1032 01:34:56,160 --> 01:34:57,200 It's still there. 1033 01:34:57,600 --> 01:34:59,980 We would love to toy with the idea of rehabilitate. 1034 01:35:00,000 --> 01:35:02,480 I'm not saying anything, but like anything, takes funding. 1035 01:35:03,000 --> 01:35:06,260 For people who don't know, would you explain what a turn table does? 1036 01:35:07,960 --> 01:35:12,200 Well, anyone with kids probably has Thomas the tank, so they've had like the rail road video. 1037 01:35:12,940 --> 01:35:21,020 So yeah, the turn table spins the locomotive around, so it can get in and out of the maintenance base for work. 1038 01:35:22,920 --> 01:35:25,340 So you don't have to back it up. 1039 01:35:25,780 --> 01:35:27,860 All right, sorry for that aside. 1040 01:35:27,860 --> 01:35:33,920 on number 10 public comments on number 10 can we have a motion and a vote count on 1041 01:35:33,920 --> 01:35:37,840 ah okay we're doing that one 1042 01:35:44,840 --> 01:35:48,340 why don't why don't why don't you go I had to tell us 1043 01:35:52,980 --> 01:36:00,820 we'll so do you do forgive me again Thomas else civil engineering the one first of all 1044 01:36:00,820 --> 01:36:07,000 this this is really great it's all part of the part in parcel can't get to two guys to go without 1045 01:36:07,000 --> 01:36:15,560 into Hillsburg, right. So but there have been conversations about the Hillsburg Bridge. I think 1046 01:36:15,560 --> 01:36:21,180 this is what is incorporated within this because again, you can't get the Hillsburg without 1047 01:36:21,180 --> 01:36:29,120 the bridge, right? So this is a question of it being, it's an existing steel bridge. It probably 1048 01:36:29,120 --> 01:36:39,660 can be used still. It's not that difficult to to upgrade or maintain. You can just add pieces to it. 1049 01:36:40,420 --> 01:36:50,340 It's like a Lego land or something like that. It's historic. It's valuable as that resource. 1050 01:36:51,640 --> 01:36:58,540 It may have to be, it may have to go. I talked with a contractor that I believe is the contractor. 1051 01:36:59,860 --> 01:37:06,280 That's two years ago or more, and there was a question about what would happen underneath 1052 01:37:07,180 --> 01:37:17,320 where the abutments of the bridge at the abutments and at the columns of the bridge and where they meet in the water. 1053 01:37:18,600 --> 01:37:25,280 It was understood that maybe there was some undercutting or something, but I was able to see that when it was dry and it looks like they're into virgin rock, 1054 01:37:25,280 --> 01:37:33,360 at least on the south side and it all looks competent and so a really good evaluation 1055 01:37:33,360 --> 01:37:42,160 average I think could really save a lot of money like if they wouldn't have done 1056 01:37:42,160 --> 01:37:47,210 what they did on the on the day bridge you know and rebuilt it they could have 1057 01:37:47,780 --> 01:37:53,820 rebuilt it with a new bridge that was eight billion dollars you know they could 1058 01:37:53,820 --> 01:37:58,120 South, the other bridge, but they all had their different arguments. 1059 01:37:59,440 --> 01:38:00,660 They didn't even say that. Thank you. 1060 01:38:04,970 --> 01:38:08,010 All right. I'm sorry. Now I've lost my place. 1061 01:38:08,090 --> 01:38:11,990 I'm happy to move adoption of the Dan to item nine. Excellent. Thank you. 1062 01:38:12,210 --> 01:38:12,650 Seconds that. 1063 01:38:14,090 --> 01:38:17,750 Move five, five, share a second. Seconds byator Thompson. 1064 01:38:17,750 --> 01:38:33,680 All in favor of any opposed abstain, all right, all for any questions or comments on number 10 or bill. 1065 01:38:33,700 --> 01:38:38,540 From the board, no public comment on number 10. 1066 01:38:41,020 --> 01:38:43,460 Go right. Motion, please. 1067 01:38:45,570 --> 01:38:47,310 I didn't plan. 1068 01:38:49,790 --> 01:38:51,050 Move by Vice Chair. 1069 01:38:51,710 --> 01:38:54,890 Second and seconded by Director Kelly. 1070 01:38:55,530 --> 01:38:56,810 All in favor say aye. 1071 01:38:56,830 --> 01:38:57,310 Aye. 1072 01:38:57,910 --> 01:38:58,610 Any opposed? 1073 01:38:59,150 --> 01:39:00,030 I've staged. 1074 01:39:00,330 --> 01:39:01,290 Cases unanimously. 1075 01:39:03,210 --> 01:39:04,670 And number 11. 1076 01:39:05,250 --> 01:39:06,790 Equations from the board. 1077 01:39:07,970 --> 01:39:09,230 Comments from the public. 1078 01:39:12,920 --> 01:39:13,860 Motion please. 1079 01:39:15,890 --> 01:39:16,810 Some moved. 1080 01:39:17,250 --> 01:39:17,550 Second. 1081 01:39:17,550 --> 01:39:25,630 approved by Director Paulson, second-end by Director Park, Owen Paver, I, and he opposed. 1082 01:39:27,430 --> 01:39:28,530 There we go. 1083 01:39:29,530 --> 01:39:35,550 And move on to number 11, the appointment of our new Chief Financial Office. 1084 01:39:36,930 --> 01:39:38,230 Sorry, number 12. 1085 01:39:39,790 --> 01:39:41,670 I think we need to get from this one. 1086 01:39:43,990 --> 01:39:46,250 Thank you again, Chair and Board of Directors. 1087 01:39:46,250 --> 01:39:53,590 I cannot tell you how excited I am to present this particular item. 1088 01:39:53,890 --> 01:39:55,490 I'll start with the recruitment process. 1089 01:39:55,830 --> 01:39:58,050 We hire CropAmer and Associates LLC. 1090 01:39:58,650 --> 01:39:59,970 They manage a nation. 1091 01:40:00,000 --> 01:40:08,480 One wide search, they worked directly with me to develop a leadership profile and really identify those skills that were necessary for the position. 1092 01:40:09,080 --> 01:40:18,740 They advertised this position nationally. They also reached out to what I like to refer to as the real edicts across the nation and recruiting folks who might be good fit. 1093 01:40:18,740 --> 01:40:24,520 They were able to forward meet 12 semifinalists, semifinalists. 1094 01:40:24,600 --> 01:40:26,880 We looked through all of those resumes. 1095 01:40:27,600 --> 01:40:31,320 We decided to interview five internally. 1096 01:40:32,680 --> 01:40:37,300 That was a smart staff and that panel of internal folks included myself. 1097 01:40:37,920 --> 01:40:41,020 The general council of the Chief Operating Officer, the Chief Engineer, 1098 01:40:41,840 --> 01:40:44,100 and the grants and legislative affairs manager. 1099 01:40:44,100 --> 01:40:50,120 And from there we noted down to two candidates that we really thought would be a good fit 1100 01:40:50,120 --> 01:40:57,340 at Smart to service the next chief financial officer and we boarded those two to a board 1101 01:40:57,340 --> 01:41:04,960 ad hoc committee, the board ad hoc committee interviewed both candidates on 8, 11, 20, 26 and 1102 01:41:04,960 --> 01:41:10,840 that particular committee consisted of chair core seed, vice chair, socket, and director par. 1103 01:41:12,340 --> 01:41:18,360 The ad hoc committee's recommendation is to appoint Troy Bingham as chief financial officer 1104 01:41:18,360 --> 01:41:24,300 pending a successful completion of the background investigation. Troy Bingham has 1105 01:41:24,300 --> 01:41:29,400 20 years of financial municipal government experience. He has eight years of transit experience. 1106 01:41:29,600 --> 01:41:33,480 He spent six years at Utah Transit Authority as the Comptroller. 1107 01:41:33,900 --> 01:41:39,460 And two years at a smaller agency in New Mexico called the North Central Transit District. 1108 01:41:39,460 --> 01:41:47,700 He served as the financial finance director in that role and he's currently the finance director at the city of Stafford, Arizona 1109 01:41:47,700 --> 01:41:54,600 and Troy has a bachelor's of science degree in accounting and information system from Arizona State University. 1110 01:41:57,270 --> 01:42:01,210 We were able to come to terms on an agreement. 1111 01:42:01,770 --> 01:42:06,170 The term of his employment would be five years annual salary between $99,250 1112 01:42:06,170 --> 01:42:11,790 $250, he would receive a cell phone and car allowance of $300 per pay period. 1113 01:42:12,070 --> 01:42:16,470 He would receive upon appointment 15 days of vacation and five days of sick. 1114 01:42:17,490 --> 01:42:20,970 He would have the ability to participate in smart benefit programs. 1115 01:42:21,630 --> 01:42:26,410 And he would get a reimbursement of $30,000 for relocation and temporary housing allowance. 1116 01:42:27,010 --> 01:42:32,470 And then would also receive severance of terminated without cause of 90 days salary and benefits. 1117 01:42:32,470 --> 01:42:54,010 So the recommended board actions here today is to point to our Bingham to the position of chief financial officer and improve the appointment and agreement subject to the completion of the successful background investigation and authorized to chair to execute agreement contingent upon the successful completion of that background investigation. 1118 01:42:54,690 --> 01:43:01,630 And with that, I would be happy to answer any questions or turn it over to the ad hoc committee for additional information. 1119 01:43:02,470 --> 01:43:07,930 Yeah, just a couple of additions from our ad hoc committee. 1120 01:43:10,350 --> 01:43:16,670 We had conversations with the final two finalists just a couple of weeks ago. 1121 01:43:17,070 --> 01:43:24,650 Both were very qualified people enthusiastic about coming to work for smart. 1122 01:43:24,650 --> 01:43:35,350 And both probably capable of doing it, Troy, stood out to me for his transit industry experience. 1123 01:43:36,930 --> 01:43:46,110 His understanding of the many types of funds that smart users to both operate and build the system. 1124 01:43:47,070 --> 01:43:52,830 And again, his enthusiasm for wanting to work for this transit agency. 1125 01:43:56,990 --> 01:44:06,590 I think you covered most of it and, again, great candidates, great that was really a pleasure to see the enthusiasm and levels of expertise. 1126 01:44:06,710 --> 01:44:14,730 I think the other thing that stood out is he does have a diverse experience and a lot of different jurisdictions, including some pretty small jurisdictions. 1127 01:44:14,730 --> 01:44:22,850 and so is dealt with kind of soup to nuts, public engagement issues, you know, isn't somebody 1128 01:44:22,850 --> 01:44:30,110 who's been buried within this C-suite but hasn't interacted with a public or actual projects. 1129 01:44:30,350 --> 01:44:34,830 And I think there's a lot that we're building at Smart, but it felt as though he would be a good 1130 01:44:34,830 --> 01:44:40,610 contributing partner for the team. I'm happy to move that. I want you ready. 1131 01:44:40,610 --> 01:44:42,750 You know, 1132 01:44:46,170 --> 01:44:59,890 some of us have been around smart for a long time, and smart has a certain culture, and when I interviewed him, and when I said on the panel, they're absolutely right. He's very, very qualified, but people come to us with coffee. 1133 01:45:00,820 --> 01:45:27,440 But I look at the overall who they are and how they relate to people. And that's one of the things that I've appreciated over the years about the smart staff, is that they're collaborative, they're positive. I know that it's not all pretty out there, but you're always good to us and don't make us get in the weeds very much on that. So what I wrote down was, of course, this transit experience, which I think is important. 1134 01:45:27,440 --> 01:45:31,380 He seemed as though he was a realistic problem solver. 1135 01:45:31,620 --> 01:45:34,220 He didn't jump right to the answer for problems. 1136 01:45:34,720 --> 01:45:36,120 He knew that there were processes. 1137 01:45:37,400 --> 01:45:41,480 Like I said, we appreciate our staff and the team approach. 1138 01:45:41,760 --> 01:45:45,560 And he showed us through some of the questions and some of the answers 1139 01:45:45,560 --> 01:45:49,960 and some heat mild a lot and joked a little bit. 1140 01:45:50,520 --> 01:45:52,760 And we can see that in our staff. 1141 01:45:52,880 --> 01:45:56,260 And that was the part that I appreciated that he would fit in. 1142 01:45:56,260 --> 01:45:59,760 He wouldn't be a CFO that would say, oh, look at that. 1143 01:46:00,560 --> 01:46:04,640 But he was very bright and the transit orientation was good. 1144 01:46:05,120 --> 01:46:11,880 He was easy to talk to, collaborative, and he just looked like he'd be a really good fit 1145 01:46:11,880 --> 01:46:12,980 for the team. 1146 01:46:15,910 --> 01:46:21,130 Any questions from the board or Mr. Cummins or any of us? 1147 01:46:23,800 --> 01:46:24,080 Right. 1148 01:46:24,540 --> 01:46:26,920 Mr. Beckett, do you want to make a motion? 1149 01:46:28,100 --> 01:46:28,620 Public comment? 1150 01:46:29,180 --> 01:46:30,020 Oh, yeah, we have that. 1151 01:46:30,020 --> 01:46:32,060 Thank you. 1152 01:46:32,080 --> 01:46:35,300 Anyone in the room want to make public comment on this item? 1153 01:46:36,960 --> 01:46:38,260 And we'll go online. 1154 01:46:39,660 --> 01:46:42,340 First personal public comment is S-curks. 1155 01:46:42,580 --> 01:46:44,920 Please go ahead and mute yourself to make your comment. 1156 01:46:46,140 --> 01:46:46,700 Thank you. 1157 01:46:46,700 --> 01:46:48,280 Susan Curks, Pvelina. 1158 01:46:49,480 --> 01:46:58,260 And reading the particulars for the agenda item and the benefits available for this individual, 1159 01:46:59,280 --> 01:47:12,760 knowing the cost of living in our area is so high, it seemed to me that $30,000 for relocation and temporary housing seemed a little low. 1160 01:47:13,300 --> 01:47:23,580 And although I'm simply a member of the public, I'm very well aware of the cost of living and thinking about monthly temporary housing expenses, 1161 01:47:23,580 --> 01:47:31,700 is the cost of relocation and the stressors involved with that for anyone, relocating from 1162 01:47:31,700 --> 01:47:38,120 one state to another, I hope your board will consider increasing that to $40,000. 1163 01:47:38,740 --> 01:47:45,000 I think that might make a very positive difference and be one less stressor that your 1164 01:47:45,000 --> 01:47:51,900 You see F.A.A.A. would have to address potentially after five or six months of temporary 1165 01:47:51,900 --> 01:47:56,000 housing and still potentially looking for permanent housing. 1166 01:47:56,420 --> 01:47:57,620 Thank you. 1167 01:47:59,640 --> 01:48:00,380 Thank you. 1168 01:48:03,160 --> 01:48:03,340 Thank you. 1169 01:48:03,340 --> 01:48:05,020 There are no more hands raised to public comment. 1170 01:48:05,540 --> 01:48:13,180 I'm happy to remove the appointment of Troy Bingham to the CFO position contingent upon the 1171 01:48:13,180 --> 01:48:15,740 successful completion of a background investigation. 1172 01:48:17,820 --> 01:48:22,600 We have a motion from Vice-Chair Circuit and a second from Director Par. 1173 01:48:23,240 --> 01:48:24,220 All in favor? 1174 01:48:24,720 --> 01:48:25,840 All right. 1175 01:48:25,880 --> 01:48:26,880 Any opposed? 1176 01:48:28,020 --> 01:48:28,720 I'm staying. 1177 01:48:29,940 --> 01:48:31,580 That is unanimous. 1178 01:48:31,640 --> 01:48:32,020 Welcome. 1179 01:48:33,160 --> 01:48:33,920 Mr. Binghammer. 1180 01:48:36,390 --> 01:48:36,490 Oh. 1181 01:48:37,210 --> 01:48:37,410 Okay. 1182 01:48:40,780 --> 01:48:40,980 All right. 1183 01:48:41,020 --> 01:48:42,720 That brings us to our adjournment. 1184 01:48:42,720 --> 01:48:46,740 Our next meeting is September 16th. 1185 01:48:46,740 --> 01:48:50,200 on 30 p.m. Right here, we'll see you that. 1186 01:48:51,320 --> 01:48:53,580 We are journeying at 315.