[0:07] We adjourn. [0:10] To the city of South Saint Paul. [0:11] I call this meeting to order [0:14] for Monday, NOVEMBER 4th. MISS [0:17] Werner, will you please call [0:19] the roll? Toen here. Council [0:21] member Hanson, Council member [0:23] Kaleski. Council member Pod [0:25] Gorski, Council member Sberg [0:27] Council member Thompson, Mayor [0:28] Francis all present. Thank you [0:29] very much. Please stand and [0:31] join us in our Invocation and [0:34] our pledge of allegiance. [0:36] Heavenly Father, we come to you [0:38] today asking for your guidance, [0:39] wisdom and support as we begin [0:42] this meeting. Help us to engage [0:43] in meaningful discussion allow [0:45] us to grow closer as a group [0:46] and nurture the bonds of [0:50] community. Amen. Amen. I pledge [0:53] allegiance to the plan of the [0:55] United States of America and to [1:00] the Republic nation under GOD [1:02] individual with liberty and [1:07] justice for all. Good evening. [1:09] We have no presentations today, [1:10] so citizens [1:11] comments is next. [1:12] Anybody here with anything that [1:13] is not on the agenda. They wish [1:15] to speak about. This is the [1:16] time to do that. Please step [1:22] forward. Seeing none. Look for [1:23] a motion to approve our agenda. [1:26] So moved, Your Honor, that [1:27] there was moved by Seabrook, [1:30] second by Bakke? Is that [1:32] correct? All right, just making [1:34] sure. All in favor? I any [1:37] oppose? Our agenda passes. Our [1:38] consent agenda, all the items [1:40] listed on our consent agenda [1:42] are considered routine and will [1:43] be approved in one motion. [1:44] There will be no separate [1:45] discussion of these items [1:47] unless a council member or a [1:48] citizen so requests. In that [1:50] event, it will be removed from [1:51] the consent agenda and [1:53] considered at the end of our [1:54] consent any items to be removed, [1:58] council. Public, any items to [1:59] be removed from our consent [2:01] agenda. Can we slow down a [2:03] little bit here? Sure, we can, [2:07] Michael. Thank you. The consent [2:09] agenda, no other items to be [2:12] removed from the public or the [2:14] council with that I look for a [2:16] motion to approve, so moved. [2:16] It [2:18] s like a moved by Kalzeki, [2:21] second by Thompson. MS. Warner, [2:21] will you please read those [2:24] items and then call the roll [2:26] resolve the city of Sault Saint [2:27] Paul does hereby approve the [2:30] following. City council meeting [2:32] minutes of OCTOBER 21st, 2024. [2:35] Accounts payable. Declare costs [2:37] to be assessed for the concrete [2:38] exchange improvement project [2:41] number 202401. Approved master [2:43] control agreement. Turf [2:48] maintenance services. Award [2:49] streetscape services to [2:50] curbside landscape and [2:52] irrigation. To declare costs to [2:55] be assessed for the 7th annual [2:58] Avenue South Reconstruction and [3:01] I-9494 water main improvement [3:04] project number 2023-12. Retain [3:05] Kraus Andersson Construction [3:06] Company as the construction [3:11] management advisor. Approved [3:12] resolution 2024 131 [3:13] acknowledgment of lawful [3:14] gambling exempt permit for Holy [3:16] Trinity Catholic Church. [3:20] Council member back in. Yes. [3:21] Mayor Francis Councilmember [3:23] Hanson, yes council member [3:25] Kalaski, Council member Pod [3:28] Gorski, Council member s Seberg [3:29] Council member Thompson. 70. [3:32] Thank you very much. Consent [3:33] passes. Next is our public [3:37] hearing. This first one is [3:38] certifying unpaid charges to [3:40] the county auditor. Hello, [3:44] Clara. Welcome. Good evening. [3:46] Um, the items that we are [3:48] certifying or asking you to [3:50] certify this evening. Our [3:52] abatements, re-inspection fees, [3:54] code enforcement citations, and [3:54] rental license citations, all [3:56] of the property owners received [3:57] a letter indicating that these [4:00] items would be on this [4:00] evening [4:01] s agenda, including the [4:02] public hearing notice, in [4:03] addition, public hearing notice [4:05] was published in this, uh, [4:08] Pioneer Press. Um, each of the [4:10] properties was notified of the [4:12] code enforcement or, um, rental [4:16] license. Uh, infraction by the [4:18] department invoices were issued [4:20] by finance, uh, statements were [4:21] sent out for the bills as they [4:24] were not paid. Uh, these [4:26] invoices were issued between [4:28] OCTOBER of 23 and SEPTEMBER of [4:31] 24. All charges are past due as [4:32] of NOVEMBER 1st in accordance [4:35] with city code. All the [4:36] property owners have until [4:38] DECEMBER 4th to pay the [4:38] original invoice amounts [4:42] without interest. Um, as [4:45] allowed by statute. At that [4:48] time, any charges not paid will [4:50] be certified to the county to [4:52] be collected with the 2025 [4:54] property taxes. These are one [4:57] year assessments. Um, one [4:58] correction I would like to make [5:00] is that we do have a pin number [5:00] that [5:01] s incorrect on the [5:03] resolution, we will make that [5:04] correction before we submit it [5:08] to the county. I myself and [5:09] other staff are available if [5:13] anyone has any questions. Uh MS. [5:16] Elders, you, uh, you said you a [5:18] property id number was missed. [5:22] Ok. One of the property IDs is [5:23] incorrect and the 113 3rd [5:27] Avenue South. Very good. Uh, [5:28] and the total assessments being [5:32] levied to the auditor is 34,776. [5:33] Is that correct? And we will [5:35] again, like I said, we [5:36] ll [5:36] deduct anything that [5:37] s paid [5:38] between now and DECEMBER 4th. [5:42] Very good. This is a public [5:43] hearing, I guess I will open [5:46] that up. Anybody here wish to [5:49] speak on the items for the [5:50] certifying unpaid charges to [5:51] the county auditor. Anybody [5:53] here whose address is on there [5:57] that wants to discuss or [6:00] Anything further? Asking again [6:02] if anybody here from the public [6:03] wishes to speak on the [6:05] certifying the unpaid charges [6:09] to the county auditor. Seeing [6:10] and hearing none, we [6:10] ll close [6:12] the public hearing, look to [6:15] counsel for questions. Comments [6:19] Emotions Your Honor, [6:20] Councilmember Sberg move to [6:21] approve with the correction to [6:23] 113 3rd Avenue South. We have a [6:26] motion to approve by Councilor [6:27] Sieberg, seconded by Podgorski [6:29] for approval. Further [6:35] discussion. Seeing none. MS. [6:37] Werner, please call the roll. [6:39] Mayor Francis, yes, [6:41] Councilmember Hanson, Council [6:43] member Kauski, Council member [6:45] Pat Gorski, council member Serg [6:47] Council member Thompson, [6:48] Council member Bakke. Yes, 70. [6:50] Thank you very much. Motion [6:54] passes. Thank you. Clara. Next [6:56] up is an assessment hearing for [6:59] concrete exchange improvements [7:01] project number 2024-01. MR. [7:03] Williams, welcome. Good evening, [7:04] Mayor and members of the [7:06] council. Uh, one second as I [7:24] load the presentation. At least [7:24] something [7:29] s happening. Sorry [7:31] about that. There it is. At [7:31] least it [7:33] s on my screen. I get [7:35] it. Ok, there we go. All right. [7:37] Good evening mayor and members [7:38] of the council. Uh, tonight is [7:41] the assessment hearing for the [7:42] Concord exchange Improvement [7:43] Project, uh, brief presentation [7:43] I [7:44] ll go through this evening, [7:46] then we can open up the public [7:47] hearing and answer any [7:51] questions the council MAY have. [7:53] So the agenda will go through a [7:55] summary of the project costs [7:56] and funding sources talk about [7:57] the special assessments, and [8:00] lastly, the councilor action. [8:02] So location we have Concord [8:03] Exchange, uh, kind of broken up [8:06] into two projects. We have the [8:07] streetscape improvements north [8:09] of Grand and the medians, uh, [8:12] that was uh funded through the [8:13] developer through the yards [8:15] development, and then we have [8:17] the reconstructions and [8:19] streetscape improvements, south [8:20] of Concord Exchange between [8:22] Grand and the southern access [8:24] that did include a full upgrade [8:26] of storm sewer system as well [8:29] as water main improvements. So [8:30] before the project, you can see [8:32] some photos here, uh, in the [8:34] streetscape area. We had some [8:36] deteriorated sidewalk [8:37] conditions, various uplifts, um, [8:40] you know, kind of some outdated [8:41] streetscape amenities, which [8:42] were all improved with this [8:45] project. Uh, you can see, uh, [8:46] in the reconstruction area, [8:47] some pavement that [8:49] s in poor [8:50] condition, potholes and things [8:53] of that nature, um, you know, a [8:57] sidewalk again varied and, and [8:57] various locations inconsistent [8:59] wits, um, and then some kind of [9:00] outdated, uh, street lights [9:01] that we replaced with this [9:06] project. So a summary in the [9:08] streetscape area, we, uh, [9:09] updated the landscaping and the [9:11] medians, uh, replaced all the [9:14] sidewalk through that, um, that [9:14] Northern peace streetscape [9:17] features, new benches, uh, [9:18] trash cans, things of that [9:20] nature, all the street lights [9:22] got upgraded. Uh, we also did [9:24] put an irrigation system in for [9:26] the medians, so public works [9:26] doesn [9:27] t have to water that, so [9:28] it [9:29] s all self-sustaining. [9:31] Reconstruction area, full [9:32] roadway reconstruction, new [9:34] aggregate base, new pavement, [9:36] new curb and gutter, uh, new [9:39] sidewalk throughout, um. New [9:40] skatescape features similar to [9:42] the, the streetscape piece, uh, [9:43] irrigation as well and all the [9:46] plantar areas. Uh, sanitary [9:48] sewer upgrades, um, so with all [9:50] the developable properties that [9:51] could be on Core exchange, we [9:53] stubbed out sewer and water to [9:54] those properties, so when they [9:55] come in to develop, we don [9:55] t [9:56] have to tear into the new [9:59] street. Uh, storm sewer, some [10:00] pretty massive storm sewer [10:01] upgrades, improved drainage, [10:03] and again, the street lighting, [10:05] we, uh, really added, um, a lot [10:06] of improvements to the street [10:07] light system out there to [10:09] really make sure it was very [10:13] lit during the evening hours. [10:16] So this kind of uh a neat slide [10:18] showing the pre-construction, [10:19] um road conditions versus post, [10:22] uh, you can kind of see what it [10:24] looked like from Aeroview, uh, [10:25] previously, um, just, you know, [10:28] road was just kind of beat up, [10:30] poor condition, had a really [10:31] inconsistent kind of road with [10:33] throughout, no real consistency [10:34] through anywhere, through the [10:36] corridor, uh, and then at the, [10:37] and then the slide at the [10:40] bottom shows kind of the post [10:41] condition, um, you know, we got [10:43] our, uh, 11 ft lanes, 9-foot [10:45] parking, being a commercial [10:46] area, um, the lines you see [10:48] there are the striping yet, the [10:48] striping is supposed to happen [10:49] today, but it didn [10:50] t happen [10:51] with the rain, but that [10:52] s just [10:53] for illustration purposes, but [10:56] kind of get the idea, um, of, [10:59] of how it looks today. With [11:02] that, um, that would show a [11:04] quick drone video for all those [11:06] who are interested, uh, about [11:07] 30 seconds long and I can kind [11:10] of describe. What we [11:10] re seeing, [11:12] so this is kind of going south. [11:14] You can see the old Vendela [11:16] glass, see the street lights, [11:18] we got our new sidewalk, you [11:21] can see the planter boxes, um, [11:24] again those are all irrigated, [11:26] uh, new curb and gutter, um, [11:27] that car is not going that fast. [11:28] It [11:28] s the, it [11:29] s the drone [11:30] footage that actually makes it [11:33] look that fast, so just so you [11:34] know so it gives you a kind of [11:35] idea of, of the improvements [11:36] that we did. I [11:37] m very proud of, [11:40] of what, how it looks. Groups [11:45] Yeah ok, sorry about that. Ok, [11:47] on to project costs and funding, [11:48] uh, looking at a total project [11:50] costs of just under 4 million. [11:53] That is under our as bid amount [11:55] by about 320,000, um, pretty [11:56] fortunate that we didn [11:57] t run [11:58] into any unforeseen conditions [12:00] along that corridor, uh, given [12:01] the history of Concert Exchange, [12:03] we kind of anticipated we might [12:07] run into some buried debris, [12:07] building foundations, [12:09] contaminated soil, things of [12:11] that nature, um, but we were [12:12] fortunate that we, we didn [12:12] t, [12:12] so we [12:13] re able to deliver it [12:15] under Budget, um, you know, [12:16] also during construction, um, [12:18] you know, Tom and Kelsey both [12:20] looking at ways to save money [12:20] during construction. We [12:20] re [12:22] always trying to find little [12:23] tweaks here that we can save [12:24] some money on this, then we do [12:25] that? That [12:26] s kind of a big part [12:28] of our job. So you can see, uh, [12:30] those costs did come in, uh, [12:35] less than our as been amount. [12:37] Funding sources so various [12:37] funding sources for this. We [12:38] got our municipal state aid is [12:41] a state of road, about 1 [12:42] million uh tax increment [12:44] financing of a million, uh, the [12:45] developer fund I previously [12:46] mentioned for the street skate [12:48] piece, um, that was kind of on [12:50] their plate to do, but we added [12:52] it to our project. It was just [12:53] easier that way. Uh, special [12:54] assessments, which we [12:54] re here [12:58] to talk about tonight, [12:59] approximately 40 545,000. Our [13:01] water utility, sanitary sewer, [13:02] and storm sewer make up the [13:07] rest of that, um. Cost. So this [13:10] is proposed to be specially [13:12] assessed through the city [13:12] s [13:15] assessment policy that rate is [13:17] $90.40 per front foot, uh, all [13:19] the properties on this corridor [13:21] are commercial retail, high, [13:22] high density residential, so [13:24] there, there is no maximum for [13:25] those commercial properties, um, [13:27] they are kept at 5%, but the [13:29] reason being is they have a [13:32] more intense use more traffic, [13:33] more heavier vehicles, kind of [13:35] more wear and tear on the road, [13:37] uh, as opposed to a residential [13:37] property there. There [13:40] s no max. [13:43] So if adopted tonight, um, [13:45] property owners have the option [13:46] to prepay the assessment within [13:48] 30 days of tonight, which would [13:49] be DECEMBER 4th without [13:51] interest. If not, it goes on, [13:52] automatically goes on property [13:54] taxes over a 10-year period, uh, [13:56] with a 5% interest rate. And [13:58] there are deferment options [14:00] available, um, for those who [14:02] qualify if, um, senior citizens, [14:03] older fixed income, disabled [14:05] veterans that usually applies [14:07] to residential properties, but [14:08] there are different options [14:11] available. So the action is to [14:15] hold a public hearing first and [14:16] then consider resolution [14:17] 2024-126, adopting the [14:20] assessment role of the Cocker [14:21] exchange improvement project. [14:22] Uh, with that, I could stand [14:23] for questions. If the council [14:27] has any. Very good. Uh, this is [14:28] a public meeting, your public [14:30] hearing? Uh, so I will open it [14:32] up for public. Anybody here [14:34] wishes to speak about the [14:36] assessment on concrete exchange [14:36] improvement for the concret [14:38] exchange improvement. This is [14:39] the time. Please step forward. [14:40] I know there [14:41] s some business [14:44] owners here present, not sure [14:46] if they wanted to discuss or um [14:48] talk. But this is the time, so [14:50] if anybody here would like to [14:53] speak from the public about the [14:53] assessing for concrete exchange [14:59] improvement. Uh, seeing none, [14:59] hearing none, I [15:00] ll close the [15:02] public hearing. And turned to [15:06] council for questions. Comments [15:08] or motions. Your Honor, [15:10] Councilmember Sberg. Nick, you [15:12] pointed out that it was capped [15:13] at 5% for commercial properties. [15:15] Can you tell us why that is and [15:18] how that complies with state [15:19] statute on assessments for [15:21] street improvement projects. [15:23] Sure, that was adopted through [15:24] the city [15:24] s assessment policy as [15:26] a way to, you know, kind of [15:28] limit how big the assessment [15:29] amount would be, um, kind of a [15:30] council decision at the time [15:32] through our policy is to have [15:32] an amount that [15:33] s not, doesn [15:33] t [15:37] exceed that. And then we are [15:39] obligated, so if somebody wants [15:41] to contest their assessment, [15:41] we [15:43] re obligated to follow state [15:45] statutes, so we have to prove [15:48] that a property went up in [15:51] value equal to or greater than [15:52] the assessment that was the [15:54] state statute part I was [15:55] getting at, um, so we [15:55] re [15:57] complying with that. We make [15:58] sure that that [15:59] s the case in [15:59] our opinion doesn [16:00] t mean we [16:00] re [16:01] always right, but that [16:02] s what [16:04] we try to do, and then the [16:05] different pots of money that [16:08] made up The revenue that went [16:10] into this, we had Minnesota [16:12] state aid in addition to the [16:13] developer [16:13] s money that happened [16:15] north of Gran we had the [16:17] sanitary sewer fund and the [16:18] storm sewer fund, sanitary and [16:21] storm, we had some differences. [16:22] You might say substantial [16:24] differences in the pre-bed [16:27] versus the post. Those are [16:27] separate enterprise funds [16:28] that [16:29] s a city operates, correct? [16:30] Yeah, Mayor remembers the [16:31] council, that [16:32] s correct. Um, so [16:34] yeah, if, if somebody does [16:35] appeal, there is a process on [16:37] the, on the amount, but We do [16:38] have the, those enterprise [16:39] funds are kind of separate pots [16:41] of money, if you will, for the [16:42] individual pieces of the work [16:47] that we do. Thank you. Others [16:47] can [16:49] t remember Kalzowski. [16:50] , [16:52] you and the entire staff and [16:54] all the contractors did a super [16:55] bang up job on that looks just [16:57] great. Kudos to all of you. [17:00] Thank you. Thank you. Very good. [17:05] Thank you, Councilor. Others? I [17:06] would agree that it does look [17:10] nice, um. I also know that We [17:11] did everything underneath the [17:17] ground. Sewer water New base so [17:19] this this road should last us [17:20] quite some time. I [17:21] ve noticed [17:22] now on your drone footage as [17:23] well as driving on it that [17:25] there are no cuts in that. [17:25] That [17:27] s a one straight. There [17:28] s [17:31] no cuts inside the. Asphalt, um, [17:31] that [17:32] s nice as well. There [17:33] s no, [17:33] there [17:34] s no noise. And is that a [17:36] new thing or is that uh the [17:38] standard of, of roads today [17:41] that there are no cuts in those. [17:42] We certainly do everything we [17:43] can to not have a cut into the [17:45] new pavement, um, sometimes [17:45] when you [17:46] re raising manholes, [17:47] if you, you know, there [17:48] s a [17:48] process to doing that where you [17:51] can have a cut into the road, [17:52] um, but we, another reason why [17:53] we stopped the utilities out so [17:54] we don [17:56] t have to cut it in the [17:57] future, so our goal is always [17:58] to not have cuts in the rope, [17:59] but sometimes, you know, we [17:59] can [17:59] t. Can [18:00] t always help it, [18:00] but that [18:02] s the goal. Very good, [18:04] thank you. Your Honor, [18:06] Councilor s Seberg, I would [18:09] move to approve Resolution [18:12] 2024-126. Second Moved by [18:13] council member Surg, seconded [18:17] by Bakken. Further discussion, [18:19] Your Honor, just one more thing, [18:20] please, please receiver and [18:22] then Nick, thanks to the [18:24] businesses down there too, [18:25] street projects are never fun. [18:29] Uh We were blessed a little bit [18:32] with some some decent weather, [18:33] uh, for the latter part of the [18:35] summer anyways, but we [18:36] understand the inconvenience [18:37] and we appreciate everybody [18:37] s [18:37] patience. It [18:38] s not just the [18:41] businesses, but on the next [18:41] project. It [18:42] s challenging. [18:42] There [18:43] s no good way to [18:46] sugarcoat that. Um, but we [18:49] appreciate The accessibility [18:51] that not only the contractor, [18:53] but Tom had in answering [18:53] people [18:53] s questions, so we [18:56] appreciate that. Yeah, I would [18:58] echo that Councilor s Seberg [18:59] with the last year [18:59] s Concord or [19:00] the two years prior with [19:03] Concord. Street and now with [19:04] Concord Exchange those [19:05] businesses have gone through a [19:07] lot, so it is uh probably test [19:09] of their patience, but now I, I [19:10] just, I council member s Seri [19:12] says, thank you for that and [19:13] appreciate your investment in [19:14] South Saint Paul. We [19:14] re hoping [19:17] Quality Auto will be there [19:17] another 25 years. So you won [19:18] t [19:21] have to see another street [19:24] project, right? Ok, uh, [19:25] anything further council, we [19:29] have a motion a second. Seeing [19:31] none, MISS. Werner, please call [19:33] the roll. Council member [19:34] Steberg Council member Pod [19:36] Gorski. Council member back in [19:39] council member Thomson, Council [19:41] member Hanson, council member [19:43] Kaluski, Mayor Francis, 70. [19:45] Thank you very much. Motion [19:46] approved. Thank you for [19:48] investing in South Saint Paul. [19:48] The businesses there on [19:51] Concrete exchange. Now we move [19:53] along to assessment hearing for [19:54] 7th Avenue South reconstruction. [19:57] MR. Williams, good evening [19:59] again, Mayor and members of the [20:01] council, uh, one second I load [20:03] the presentation. Ok, here we [20:05] go. This this is the assessment [20:08] hearing for the 7th Avenue [20:09] South reconstruction project [20:10] similar to the last [20:11] presentation, uh, brief [20:12] presentation will go through [20:14] and we can open up, uh, [20:14] questions and the public [20:18] hearing at the end. Talk about [20:19] the summary of the project, [20:21] cost and funding, uh, [20:22] assessment policy again, as [20:25] well as the council action. So [20:26] this project was the [20:27] reconstruction and JULY proved [20:30] the 7 Avenue South from I-494 [20:32] to South Street, 5 blocks of [20:34] 7th Avenue South and also [20:36] consisted of the uh water main [20:38] improvements along the under [20:43] and along the I-494 corridor. [20:44] Pre-construction conditions, [20:46] you can see the the road was [20:47] definitely past its useful life [20:48] as well as the water main, [20:50] being 84 years old, um, did [20:52] have a history of water main [20:54] breaks, sanitary sewer was also, [20:57] uh, old and we were able to, to [20:58] rehab that roadway drainage was, [21:00] was kind of lacking. We were [21:02] able to improve that, and then [21:04] there was a, uh, sidewalk gap, [21:06] uh, on the east side between [21:07] Dale and South Street that [21:07] s [21:08] been identified in in several [21:10] city plans in the past and we [21:11] were able to, uh, to put that [21:15] new sidewalk in. And then the, [21:16] the I-4994 Waterman crossings, [21:17] this work isn [21:19] t accessible work, [21:21] but very important work as we [21:22] had multiple crossings under [21:25] that, uh, interstate, um, that [21:26] were not encased old pipes in [21:29] the Risk there is if those [21:32] pipes were ever to burst, you [21:33] could potentially have sinkhole [21:34] develop on a major interstate, [21:36] which nobody wants. So we were [21:37] able to correct that with this [21:41] project as well. So the [21:42] existing conditions, 60 ft [21:45] right of way, 44 ft wide, um, [21:45] it [21:47] s kind of oversized for our [21:49] new standards, um, twelve-foot [21:51] lanes, 10-foot shoulders, uh, [21:54] and then the 7 7.5 ft sidewalk [21:56] between 494 and Dale. Uh, again, [21:57] the no sidewalk, there was a [21:59] gap between Dale and South [22:02] Street. So what do we consider [22:03] during road design? Well, this [22:04] is a state aid road, so that [22:04] s [22:05] first and foremost, make sure [22:09] we meet state aid standards for [22:11] line width and parking. We did [22:12] include a 5-foot boulevard for [22:13] our city [22:13] s new tree ordinance [22:15] so we could plant trees in [22:18] those boulevards. Uh, we [22:20] addressed that sidewalk gap uh [22:22] between uh Dale and South that [22:24] was identified in our 2014 bike [22:27] plan as well as our comp plan. [22:29] And we want to make sure it [22:30] meets our complete streets [22:31] policies the council adopted in [22:34] 2019, which, which it does, and [22:35] then kind of standard is we [22:37] always try to avoid property [22:38] acquisition, expensive [22:40] retaining walls and things of [22:41] that nature on all projects we [22:45] we do and reconstruct roads. [22:46] Summer of the project, so a [22:47] couple of photos you can see [22:50] again, I, I think this really [22:51] turned out amazing, you know, [22:53] with brand new water main, new [22:56] services to the curb stop, uh, [22:57] reline the sanitary sewer [22:58] manholes when you realign the [22:59] sanitary sewer, it [23:00] s basically [23:02] a new pipe after you reign it, [23:05] just cheaper to do that. Uh, [23:06] all brand new storms were [23:08] through there, uh, replacement [23:09] and really upgraded the, the [23:12] drainage of the road, uh, full [23:13] roadway reconstruction, [23:14] sidewalk installation, uh, the [23:14] street lighting, kind of [23:16] matching. Our new street light [23:17] standard that we [23:18] ve seen on [23:19] Congre Exchange, Concord Street, [23:21] uh, trying to have a consistent [23:22] kind of light standard. So if [23:23] we ever do replace streets, [23:25] street lights, we have the [23:28] parts handy. And then, uh, [23:28] boulevard tree planning, we [23:29] weren [23:30] t able to do that this [23:31] year with the, with the weather, [23:32] the fall, um, but we are [23:33] planning to do that in the [23:34] spring. We [23:36] ll be contacting, uh, [23:37] residents about they want a [23:39] tree, we can work with them to [23:43] get one. And then 494 work [23:44] really removing all those [23:45] redundant crossings, putting [23:47] one big crossing in, casing [23:48] that pipe, if there [23:49] s ever a [23:49] problem, it [23:49] s casing, it [23:50] s not [23:52] going to undermine the, the [23:53] surface under the road under [23:55] the interstate. And then we [23:57] also upgraded the system with [23:58] kind of looping it and, you [23:59] know, kind of making sure it [24:00] s [24:04] more resilient, more efficient. [24:07] So similar photo, um, of the [24:08] pre-construction versus post, [24:09] uh, you can kind of see the [24:10] center lines matching up. You [24:11] can gives you a good idea of [24:13] kind of how the road changed, [24:15] right? From it, it did narrow a [24:17] bit. Again, that [24:18] s for our new [24:19] standards trying to 11 ft lanes [24:22] with 8 ft parking, uh, I will [24:24] confirm the parking is 8 ft. [24:25] From the face of the curve to [24:27] the middle of the stripe, so [24:28] that [24:29] s been verified multiple [24:32] times, so any concern? That [24:32] s [24:33] been addressed, um, and then [24:36] the 5 ft sidewalk we put in, uh, [24:39] to have a, a complete sidewalk [24:45] from 494 down to south. Similar [24:46] to Congress a cool video to [24:47] show again, about 30 seconds [24:53] long. Play that now. So I was [24:54] traveling southbound on 7th [24:56] Avenue South. You can see we [24:58] have street lighting, the [24:59] 11-foot lanes, 8 ft parking, [25:02] new curb and gutter. Matched in [25:04] all the driveways, um, new [25:06] carriage walks for people, um. [25:09] Got the new so. Pedestrian [25:13] improvements with new curb [25:13] ramps, um, so that pretty much [25:14] just continues along the hill 5 [25:15] blocks of the road. So thank [25:19] you to, um, Jacob Steiner, our [25:20] communications coordinator for [25:20] for filming this. It [25:20] s nice to [25:29] have. Sorry about that. Oops [25:35] Sorry, ok. Oops, sorry about [25:41] that. Try this again. Ok, sorry, [25:42] a little glitchy. All right, on [25:44] the project cost funding, so, [25:46] uh, Project To came in about [25:47] 3.7 million that happy to say [25:48] that did come in under budget [25:51] as well. Similar to Conquer [25:51] s [25:52] Change, we pretty fortunately [25:53] we didn [25:54] t run into any [25:56] unforeseen conditions. We had [25:57] good soils, no real, you know, [25:59] issues. A lot of times they [25:59] ll [26:00] run into sub-grade issues. You [26:00] just, you never know what [26:01] you [26:01] re gonna get into when [26:01] you [26:02] re, when you [26:02] re [26:04] constructing a road, so we got [26:06] pretty fortunate with that. Uh, [26:07] everything went very smooth. Um, [26:10] as you can see by the pricing, [26:11] uh, everything was, uh, you [26:12] know, uh, came in, came in [26:14] really good, so really happy to [26:20] see that. As far as uh [26:21] Assessments are concerned, [26:22] again, this is specially [26:24] assessed for the city [26:24] s [26:26] assessment policy, that rate, [26:29] uh, is $90.40 per front foot. [26:33] Uh, there is a 7 75 ft maximum [26:34] accessible for residential [26:35] properties. Yeah, if you have a [26:37] corner lot, you only get [26:38] assessed on the narrow side, [26:40] not the long side, and those [26:42] are also capped at 5%. Uh, you [26:44] can see the table to the right, [26:45] kind of what the amounts are, [26:47] uh, most of the lots on 79 [26:49] South or in the 50 to 40 ft [26:54] frontage. Payment options have [26:56] adopted tonight again they have [26:57] 30, 30 days from tonight, uh, [27:00] which would be DECEMBER 4th, if [27:01] adopted to prepay without [27:03] interest. If not, that does go [27:05] on property taxes over a [27:06] 10-year period, 5% interest [27:09] rate, and, uh, there are [27:10] different options available if [27:13] anyone does qualify, uh, senior [27:14] citizens, fixed incomes, [27:15] disabled veterans are, are the [27:17] kind of the categories if, uh, [27:20] for deferrals. Actually seeing [27:22] is to hold public hearing and [27:26] then to consider resolution [27:27] 2024-127, adopting the [27:29] assessment role for the 7th [27:30] himself and I 494 Water main [27:32] Improvements Project. Uh, that [27:33] concludes staff [27:33] s report. I [27:33] d [27:34] be happy to answer any [27:36] questions you MAY have. Thank [27:38] you, MR. Williams. This is a [27:39] public hearing, so we will open [27:42] it up for the public. Anybody [27:44] here wish to speak about the [27:45] assessment on 7th Avenue South [27:47] for the reconstruction. Uh, [27:48] this is the opportunities. [27:52] Please step forward. We have [27:52] questions, comments, or [28:07] concerned. Welcome. Hello, um, [28:08] I really don [28:09] t know anything [28:13] about this process, but why? [28:16] Thank you. Why isn [28:18] t um Why are [28:21] you holding a hearing now? [28:22] Rather than before the [28:25] construction happened. We held [28:27] a hearing. I, I think you, I [28:28] remember you being here and [28:30] speaking at that, right, but [28:30] now you [28:34] re Voting on the or [28:35] Going to determine the [28:36] assessment if it [28:38] s Going to [28:39] follow through or not follow [28:43] through or Yes, that [28:45] s, that [28:45] s [28:47] the process we, we, we hold it [28:48] before we let people know we [28:50] have the call for the bids, we [28:52] bid it. It gets constructed, [28:55] and then we assess afterwards. [28:56] Isn [28:57] t that like putting the [28:59] cart before the horse. Well, I [29:01] think MR. Williams could [29:04] explain that the The formula is [29:05] already set, and we talked [29:07] about that in the beginning as [29:09] I, I think, again, you had some [29:12] concerns with that being um. On [29:14] a fixed income and homeowner, [29:16] correct, all those things, yeah [29:18] exactly because it, it almost [29:18] feels like we never had a voice. [29:23] We had a voice, uh, for the [29:25] levy for the proposed increase [29:27] in our taxes for the schooling [29:31] uh 1.5% raise in our property [29:32] taxes to uh additional funding [29:33] for schools, you know, when [29:35] they got brand new computers [29:36] and everything, we voted on [29:39] that. No problem, but this one [29:40] I, I feel like we never got a [29:45] say in the whole matter. And [29:45] Now the work [29:48] s been done. But [29:48] now you [29:53] re Trying to basically [29:55] say now should we charge Each [29:57] and every person that lives on [30:01] 7th Avenue, an assessment. What [30:01] if it doesn [30:04] t pass or I guess, [30:05] is there a chance of it not [30:10] passing. I, I, I don [30:10] t [30:12] understand the reasoning or the [30:14] why for here because It feels [30:15] like we never had a vote in the [30:18] whole matter. Or we weren [30:18] t [30:22] hurt. You, Your Honor, [30:23] COUNCILMAN Sberg, you bring up [30:27] good points. I understand where [30:28] you [30:28] re coming from, but [30:28] individual street projects do [30:32] not go towards a citywide vote. [30:32] That [30:32] s not good government. [30:33] That [30:36] s Pushing off our [30:39] responsibility to fix up our [30:41] infrastructure to a popular [30:42] opinion at the time. Nobody [30:44] wants to pay for anything. The [30:47] first option is free. As you [30:49] looked at the breakdown, the [30:51] community as a whole is paying [30:53] for the overwhelming part of [30:54] this project. It [30:54] s important [30:58] for us to provide good, safe [30:59] city streets. In addition to [31:00] that, it [31:02] s important for you to [31:04] have adequate water and [31:07] sanitary service to your curb [31:07] light. That [31:08] s not a votable [31:09] thing. That [31:10] s not like a levy [31:12] where you get to say, yeah, you [31:12] know, we [31:13] re going to put that [31:15] in front of everybody in the [31:15] city. We [31:18] re going to redo. 5 [31:21] blocks of 7th Avenue South from [31:24] 494 to South Street. So your [31:26] vote in this matter and the [31:26] reason we [31:27] re certifying this is [31:27] because it [31:29] s got to go on the [31:31] tax rolls to either be [31:33] collected over the next 10 [31:35] years at a 5% interest rate, [31:38] which is a good interest rate, [31:40] or if you qualify for a senior [31:44] deferral or a fixed income [31:45] deferral or disability deferral [31:47] that ball starts. Rolling this [31:50] evening, so There, you MAY have [31:51] a difference of opinion on [31:52] whether we should do a street [31:56] or not, and we do care. We [31:56] ve [31:58] delayed street projects. Which [31:59] hasn [31:59] t been the smartest thing [32:00] to do because we get a room [32:02] full of folks. Well, this [32:02] street doesn [32:03] t need to be done. [32:04] Well, the price doesn [32:05] t [32:07] generally go down. It goes up. [32:11] And we try to set a fair amount [32:13] on the front footage that [32:15] covers a portion of the cost [32:17] that is set in the state [32:20] statutes. You can, you have [32:22] every right to contest that [32:22] what we [32:23] re charging is not what [32:25] you got. In other words, if you [32:26] don [32:28] t think the value of your [32:30] home went up by the amount [32:30] you [32:31] re being assessed, you can [32:33] challenge that. You have every [32:34] right to do that. It [32:34] s up to us. [32:39] To only assess what we believe [32:42] the value of the homes went up. [32:42] That [32:43] s our responsibility, so [32:43] we [32:44] re not, we [32:46] re not trying to [32:48] do anything sneaky, but if we [32:50] literally voted on every street [32:51] project in the community. [32:52] Hardly any of them would get [32:57] accomplished. Because again, or [33:00] If the city paid the entire [33:02] cost of every street project. [33:04] The amount of assessments on [33:06] this project that get assessed [33:09] back to the homeowner is what, [33:17] 4 462. What was it??????? [33:18] 4,621,462,000. If we added [33:21] 462,000 to the general levy. [33:26] Either in this year or in 2025 [33:27] to pay this, everybody [33:28] s taxes [33:30] would go up in the finance [33:31] director just left. My best [33:33] guess. And don [33:35] t quote me on [33:36] Facebook on this because that [33:36] s [33:39] what the finance persons for [33:43] would be over 5%. So we don [33:47] t [33:47] have the luxury of paying for [33:47] all street assessments or [33:49] paying for the entire cost of [33:53] every street project. The the [33:55] water services in the street. [33:58] Is paid by you and me. The [33:58] city [34:00] s portion of the street is [34:01] paid by you and me and [34:03] everybody that lives in the [34:04] community that [34:06] s not assessed, [34:07] so street assessment hearings [34:09] are always the hardest hearings [34:10] for us because we [34:11] re asking [34:14] people to pay money. What we [34:14] ve [34:16] consistently tried to do [34:17] through the time I [34:18] ve been here [34:21] is treat them all the same so [34:21] nobody gets preferential [34:23] treatment. We [34:24] re all paying a [34:25] portion of everybody [34:27] s street. [34:29] The the project before yours [34:30] was concrete exchange. You paid [34:32] for a part of that. You [34:33] re not [34:34] getting assessed on that [34:35] yourself where you [34:36] re writing a [34:37] check every month. But through [34:39] your property taxes, you paid a [34:41] portion of that. You paid a [34:43] portion of 5th Avenue. The [34:44] people on 5th Avenue are paying [34:46] a portion of the 7th Avenue [34:47] Street. It [34:48] s always been our [34:51] thinking that all of the public [34:53] streets are truly public and we [34:54] all have an investment that we [34:57] need to make. In that [35:00] infrastructure to keep our [35:01] streets workable and travelable [35:03] to keep our sidewalks in good [35:05] condition, but more importantly [35:07] for us to make sure that when [35:10] it rains, The water drains and [35:12] it goes someplace. And when you [35:14] turn on your tap, You [35:14] re [35:16] getting water that comes out of [35:19] your tap, and believe me, we [35:19] ve [35:21] run the numbers countless times [35:22] over the years. If we can [35:25] afford to pay for everybody [35:25] s [35:27] street projects entirely. We [35:29] would love to do that, but it [35:30] s [35:31] not necessarily the fairest and [35:34] most equitable way to do it. So [35:34] I hear what you [35:35] re saying. I [35:38] appreciate you coming here. The [35:39] only thing that uh leftover [35:43] thing that I have is When I [35:44] turned the faucet on, water [35:46] came out. When I flush the [35:52] toilet. It went down, um. To my [35:53] knowledge, there wasn [35:53] t a [35:58] problem. I know that the street [36:01] itself looked. Hideous. To say [36:11] the least. Basically He gave [36:13] the street a facelift. We read [36:14] no, that [36:15] s not true though. If [36:16] I might point that out, we [36:17] didn [36:19] t give the street a [36:22] facelift. We gave him an [36:23] extensive rebuild that [36:23] s going [36:25] to last another 25 years, that [36:28] water main that was under there [36:30] was 84 years old. It [36:30] s like [36:32] your house. How long does your [36:35] roof last? I [36:37] m asking you about [36:39] Can you put it off another 2 [36:40] years of times are tough. Sure [36:42] you can, but then what happens? [36:42] It [36:43] s got to be done at some [36:47] point, right? And it generally [36:47] Doesn [36:49] t get any less expensive. [36:51] Understandably so but there [36:51] wasn [36:53] t a problem. There was a [36:54] huge problem with that street. [36:56] It was laid out in the [36:57] presentation and in the public [36:58] hearings six months ago about [37:00] the sewer system and the water [37:02] system. There was no, it was [37:03] televised. There was a [37:04] challenge with the water and [37:06] sewer system. It was being [37:07] degraded and it was going to [37:09] start to leak. We [37:10] ve had [37:12] multiple water main breaks [37:13] coming under 494 and in the [37:15] south end of town that had to [37:16] be addressed. We just couldn [37:16] t [37:18] put it off any longer because [37:21] your taxes and my taxes, pay [37:23] for the water department to fix [37:24] those water main breaks every [37:24] time there [37:26] s a water main [37:29] breaks at a certain point it [37:30] becomes more economically [37:31] feasible for everybody that [37:34] lives in this community. To [37:36] redo a street where you have [37:38] multiple challenges instead of [37:39] patching it with asphalt, [37:41] digging up the street to fix a [37:43] water main break, digging up [37:45] the street to fix a sanitary [37:48] sewer break. If I had my way, I [37:49] wish that everything would last [37:52] 100 years. It would make our [37:54] Our obligation up here much, [37:55] much simpler and we wouldn [37:55] t [37:58] have to send you a bill, but [37:58] that [38:00] s not reality. To my [38:03] knowledge, the, I think the [38:04] company [38:06] s name was Inogenesis [38:09] or the, the, the sewer guys. [38:14] They lined The sewers From 494 [38:17] all the way to South. They were [38:20] just lined. There were no [38:25] actual pipes. Removed From my [38:27] understanding. Now I was out [38:28] there seeing them dig every day. [38:32] Spoke to one of the foremen, [38:35] they said, well, This is almost [38:36] better than replacing the pipes, [38:38] that type of thing. It [38:38] ll last [38:43] another 20 years. And I just [38:47] found it. Pretty interesting [38:48] because the reason why all the [38:50] digging up and everything else, [38:52] I believe. Was because we were [38:55] gonna get New sewer pipes, or [38:58] at least You know, upgraded [39:01] ones, but You know, I saw them [39:05] do the lining and everything. [39:05] So they [39:07] re good for another 20 [39:10] more years or so. So if a [39:13] problem happens, Are we looking [39:18] at this all over again? And not [39:18] being cosmetic in front, you [39:20] know, make it look nice because [39:22] it does look great. It looks [39:23] fantastic, you know, 7th Avenue, [39:24] but that [39:25] s not gonna last if [39:27] they continue having semi [39:28] tractor trailer trucks drive [39:29] down the road. Let [39:30] s, let [39:31] s let [39:33] that Nick uh answer the lining [39:35] question? Sure, yeah, Mayorman [39:37] is the council. So sanitary [39:38] sewer lining as opposed to [39:40] water main, you, you can line, [39:41] a sewer. It [39:42] s a, it [39:42] s a process [39:45] called, um, cast in place or [39:47] cured in place, uh, piping, so [39:49] it basically ends up being a [39:50] brand new pipe when you [39:50] re done. [39:52] So the, the beauty is if it [39:52] s [39:54] in good enough condition is you [39:55] can just line it, which ends up [39:56] being a brand new pipe in the [40:01] end. Basically it gets the same [40:02] useful life you just you get [40:03] more than 20 years out of it, [40:03] we [40:05] ll probably get 50 years out [40:06] of it, um, you know, so there [40:06] s, [40:06] there [40:07] s no need to replace the [40:09] pipe at that point when you can [40:10] light it. Now Waterman, you [40:10] can [40:11] t do that, and the water [40:13] main, has to be fully replaced [40:14] and removed, and that [40:15] s what we [40:15] did in this situation. And [40:17] there was a history of water [40:19] main breaks through that [40:20] corridor and that [40:20] s the reason [40:22] why we, we needed to replace [40:23] the water main, um, to answer a [40:25] couple more questions, she [40:28] mentioned, um. Is we during the [40:30] assessment process, we have a [40:31] feasibility study that that [40:31] s [40:32] done and a public improvement [40:34] hearing at that hearing, [40:35] everyone [40:36] s kind of told what [40:38] the preliminary assessment role [40:40] will be. So that was presented [40:41] at that public hearing, and [40:44] everyone got a notice of what [40:45] the proposed assessment would [40:47] be, so this is really not new [40:47] information we [40:48] re providing [40:48] tonight. It [40:49] s just kind of the [40:51] formality of the assessment, [40:52] adopting it, um, and then we [40:54] also presented that at at the [40:55] uh neighborhood meeting, which [40:55] I, I know you [40:55] re at, we present. [40:58] That kind of assessment [40:59] discussion at that as well. So [41:00] i just wanted to let the [41:02] council know about that. Your [41:05] Honor, just just I could ask. [41:09] Council Please, by officially [41:10] adopting the assessment, it [41:13] gives Residents who are being [41:15] assessed, it starts the time [41:16] clock on contesting the [41:19] assessment, does it not? So [41:20] that [41:22] s part of the formal [41:24] process too, and Again, there [41:24] s [41:25] no hard feelings if you don [41:26] t [41:26] believe that you [41:27] re getting [41:27] your money [41:28] s worth out of this [41:33] project, you can pursue that. [41:34] The only difference I see was [41:36] that what was said at the [41:37] preliminary meetings like you [41:38] were stating and everything as [41:40] far as uh And what we were [41:46] presented with. The main reason [41:50] Was to replace 85 year old [41:53] pipes. That was the crux of the [41:56] meeting to replace 85 year old [41:57] pipes after Inogenesis did [41:59] their evaluation and they put [42:01] the, the, the camera, the [42:01] microscopic camera through the [42:05] tube and everything. One of the [42:06] foremans kind of stood up and [42:08] said, why do we want to create [42:09] a problem when we can take care [42:13] of it this way. And that [42:13] s when [42:15] the lining came into play and [42:16] everything else and I don [42:16] t [42:20] know Much about uh, you know, [42:22] lining or this or that or. I [42:22] don [42:25] t know, but What I was [42:28] expecting and what I was. [42:30] Believing what would happen was [42:31] 85 year old pipes would be dug [42:33] out of the ground, which is why [42:35] they were going to The massive [42:38] area in front of my house. And [42:43] Replace The sewer pipes, [42:43] because they [42:46] re 85 years old. [42:46] That didn [42:47] t happen. They lined [42:51] the sewer. I don [42:52] t know about [42:53] the newer technology. I don [42:54] t [42:56] know about anything else and it [42:58] probably is going to be ok, but [43:01] what was said at this other [43:04] meeting was not what happened. [43:04] That [43:04] s what I [43:07] m getting at. And [43:09] for residents like myself that [43:11] saw every single day. The [43:12] construction and everything [43:15] moving along with it. I felt [43:17] kind of helpless. Because I [43:18] didn [43:18] t know exactly what was [43:24] going on. Sure. And um MR. [43:25] Williams, uh, you had mentioned [43:27] that there was a reduction in [43:29] cost would that anything to do [43:31] with uh the The lining of the [43:33] pipes. I know we were under [43:35] budget by the foreman told me [43:37] that too at at right after they [43:41] put the micro uh or the Scope, [43:43] the scope down and basically [43:46] said, If we started cracking [43:48] into the sewer pipes and [43:48] everything. We [43:51] re gonna put [43:53] Newer technology with older [43:54] receiving pipes and everything, [43:54] we [43:58] re gonna cause a problem. [43:58] And that [43:59] s why I understood [44:00] what he was saying, but what [44:02] was said at the meeting and [44:03] then said, and then what [44:08] happened? To me, there are two [44:09] different things, and [44:09] somebody [44:11] s got to be aware of [44:12] this. MR. Williams answer that, [44:13] and then, uh, can [44:15] t remember. [44:16] Yeah, mayor and members of the [44:18] council, the plan was to always [44:20] line those sewers, if you look [44:21] back at our feasibility stage. [44:23] The plan was to always line the [44:24] sanitary sewer again, there [44:24] s [44:26] no need to replace the pipe [44:26] when it [44:27] s in good enough [44:27] condition where you can line it [44:29] because you end up with a new [44:31] pipe at the end. Um, as far as [44:33] the costs are concerned, um, it [44:35] was always a plan to line it, [44:37] um, the cost reduction you see [44:38] is we have less services that [44:41] we run into. So sometimes we, [44:42] if the services are where the [44:44] water main is, we have to [44:45] replace their service and so [44:47] sometimes that can get costly, [44:48] so we have to assume we [44:48] re [44:49] going to replace so many in [44:50] this case we [44:51] re able to do that [44:52] work without replacing those, [44:54] but the plan was always line it, [44:55] we shared that at the [44:56] neighborhood meeting, we shared [44:57] that in a feasibility study [45:00] that was always the plan. I [45:00] can [45:02] t Hanson and I also think [45:03] that um it [45:06] s a good example. To [45:07] the residents of how we hire [45:09] people to go in and do a [45:10] project, and if they see [45:12] something or some way it can be [45:13] done better. I think that [45:13] s a [45:16] good thing. So even they [45:17] expected something different [45:18] what you got was probably [45:21] better so. I appreciate the [45:23] fact that that our employees [45:25] and the people we hire take the [45:26] time to check that. I [45:27] m, I [45:27] m [45:29] impressed that you were able to [45:30] talk with them and they [45:30] explained it all so I think [45:31] that that [45:35] s great. And if I, if [45:37] I MAY add, um, during [45:39] construction, we, we go above [45:40] and beyond to communicate the [45:41] the items of work that were [45:42] happening. I, I don [45:42] t know if [45:44] you were on the email list that [45:48] Kelsey had sent out weekly, but, [45:49] um, we did communicate um very [45:50] frequently with, with the [45:51] neighborhood to let people know [45:53] what was happening, what to [45:54] expect, all of our contact info [45:55] was there. I think you [45:55] ve [45:57] talked to Tom a few times in [45:59] the field during construction, [45:59] so you [46:00] re kind of aware of what [46:01] was happening. I just wanted to [46:02] make sure you were, you were [46:08] aware of that. Ok. But um Maybe [46:12] just uh And update or advise us, [46:15] you know. The difference [46:18] because uh The yard got torn up. [46:22] My tree roots, the big tree on [46:25] 7th Avenue takes up lot of [46:28] space, um, were exposed. They [46:29] put side on it, but uh I don [46:30] t [46:30] know if that [46:30] s going to catch [46:34] in. There [46:35] s a possibility of [46:37] that huge tree which was there [46:39] since before I was Even moved [46:40] into the place and everything. [46:40] I don [46:41] t know if that [46:42] s gonna [46:43] survive because they really did [46:45] cut in. To the property line [46:48] and the root. So I [46:48] m hoping [46:51] that it comes back. But I [46:52] m [46:53] pretty sure that when they were [46:54] cutting and everything, they [46:55] were cutting to replace the [46:57] sewer line. And not just Line [47:02] it. So What [47:05] s your address? [47:06] 1120 7th Avenue. So, the [47:09] massive tree in the front yard, [47:09] that [47:14] s my big baby. Ok Thank [47:16] you. Thank you. Thank you for [47:18] coming down. This is a public [47:20] hearing. Anybody here else wish [47:22] to speak on the assessment [47:23] hearing for 7th Avenue South [47:24] Reconstruction. This is the [47:28] time, please step forward. This [47:29] is a public meeting and it is [47:32] open. For public consideration, [47:36] comment. I [47:37] ll ask one more time [47:39] if anybody is here that wishes [47:40] to speak again on the [47:41] assessment hearing for 7th [47:45] Avenue South Reconstruction. [47:47] Seeing none a closed public [47:51] hearing. Turn to council for [47:53] questions, Councilor Hansen. Um, [47:55] first of all, I would like to, [47:58] uh, make a motion to approve [48:00] the project number 2023-12. [48:01] Then after that I have [48:03] something else to say. Motion [48:07] by Hansen for approval. 2 by. [48:11] Kalzewski. Further discussion, [48:14] Councillorhansson. I was so [48:16] impressed by how that project [48:17] turned out. If you haven [48:18] t had [48:21] time yet to take a drive down [48:22] 7th Avenue South. It [48:22] s [48:23] beautiful. I hope all of our [48:25] streets end up looking like [48:27] that in town because it, they [48:30] did a great job. I heard [48:32] nothing but compliments about [48:33] McNamara, the construction [48:34] company that worked on that, [48:35] and obviously, it, you know, [48:37] just the way they talk to the [48:39] the people that live there, [48:41] they were all more several [48:42] people actually came up and [48:44] told me what. A great job they [48:44] did, and they [48:45] d be out there [48:45] working and they [48:46] d be cleaning [48:49] up, and he said, um, they were [48:50] just very impressed by the [48:51] company that did the work and [48:53] so that makes me feel good that [48:56] we made a good choice and we [48:57] did have some discussion about [48:59] the width of the street, and [48:59] I [49:00] m pleased that it turned out [49:03] very well. That [49:04] s it. Thank you, [49:09] Councilor. Others. I would echo [49:09] Council member Hanson [49:12] s um, [49:14] Comments about the project, um, [49:16] I was not for the sidewalk, um, [49:18] I think I was the only [49:19] dissenting vote for for the [49:24] sidewalk, um. But Like most [49:26] projects, when there [49:27] s a [49:28] dissension and approval. We [49:30] continue to support that and [49:32] having walked that whole strip [49:34] with uh Tom Madigan, who is our [49:36] project superintendent. I, I [49:39] too was impressed at at how it [49:41] turned out and um. Also we [49:41] re [49:43] very fortunate in the city of [49:43] South Saint Paul, ma [49:44] am, you, [49:45] you met with Tom and others [49:48] have met with Tom as, as well. [49:51] Uh, he spent An absorbitant [49:52] amount of time making sure [49:53] people were aware of what was [49:55] going on and making sure that [49:57] it was the project came out the [49:59] way it does from designing um [50:02] to Execution to working with [50:05] the contractors and folks I can [50:07] tell you that we are so lucky [50:09] to have Tom on our team for [50:10] your sake, he [50:11] s there to make [50:13] sure that the project gets done [50:14] to the specifications and that [50:16] nothing gets missed and there [50:16] s [50:20] no no things cut corners cut [50:20] and so again we [50:21] re, I [50:22] m very [50:23] impressed at seeing that, um, [50:23] I [50:27] m. More of a fan of sidewalks [50:29] than I was before. I think that [50:32] it turned out. Better than I [50:33] anticipated with a sidewalk, [50:36] and I think it really does help [50:37] our connect our community from [50:38] north to south, and so I [50:39] m, I [50:39] m [50:40] impressed with that. So thank [50:41] you, Councilmember Hanson for [50:43] bringing that forward. [50:45] Councilor Bakken, I actually [50:47] have a question and a comment. [50:50] I love the sidewalk, actually, [50:51] um, the track team and the [50:55] cross country team use it a lot [50:58] to run and as we redo a lot of [50:59] the projects in South Saint [51:00] Paul. We [51:03] re an old city. And [51:04] accessibility wasn [51:04] t [51:05] necessarily a thing when we [51:07] were created back in the day. [51:09] So the fact that we have 3 ft [51:12] sidewalks, kids. Anybody [51:14] wheelchairs, they all can get [51:16] down, um, to upper fifty-fifth [51:18] safely. Um, that was a pretty [51:19] wide road to just have [51:20] pedestrians pretty much on the [51:22] street or in people [51:23] s yards. So [51:27] I, I think that um, is, um, I [51:27] think that [51:28] s the prize of it [51:30] all, other than the, the road [51:32] being redone. I do have a [51:34] question, a follow up about the [51:37] trees, um, will people get an [51:37] option to have a tree? You said [51:40] you were going to be contacting [51:41] residents or um, are they, are [51:43] they just going to be planted [51:47] in a certain Sure, uh, Mayor [51:47] mayor and members of the [51:49] council, we will be asking [51:51] people if they want a tree. Now [51:51] they [51:54] re certain. Criteria [51:56] involved if we have private [51:58] utilities or our our water main [52:00] or sewer in the way, then they [52:00] can [52:02] t put a tree there on their [52:03] property. We don [52:03] t want that [52:05] growing into our new pipes, but [52:06] we are giving people the option [52:08] if they do want a tree, um, [52:08] we [52:09] ll be reaching out this [52:11] spring and, uh, offering those [52:12] up to people. So they do have [52:14] an option, yes. Perfect. Thank [52:21] you. Others Xinan motion the [52:23] 2nd. MS. Werner, please call [52:26] the roll. Council member Pad [52:28] Gorski. Yes, council member [52:31] Thompson. Yes. Council member [52:34] Keleski, council member back in [52:36] Mayor Francis, council member [52:37] Hanson, Council member Curg. [52:42] Yes. 70. Thank you very much. [52:44] Motion is approved. Thank you [52:45] all residents for investing in [52:47] South Saint Paul and uh those [52:49] that worked on that project, [52:50] getting that buttoned up before [52:53] the end of the year. Moving on [52:54] from our public hearings to [52:58] general business. First is a [52:58] preliminary development [52:59] agreement llc at the Hardman [53:05] Triangle Phase one. Doctor [53:08] Garcia, welcome. Thank you. MR. [53:10] Mayor, members of the council, [53:11] uh, item 10a. Tonight we are [53:13] seeking approval of a [53:14] preliminary development [53:17] agreement with That llc or eda [53:20] owned property. At the corner [53:21] of Grand Avenue and Concord [53:24] Street. Um, just a quick [53:26] summary, the agreement is [53:28] enclosed in the in tonight [53:28] s [53:29] packet, uh, but just a quick [53:32] summary of that agreement. This [53:34] establishes an exclusive [53:35] relationship between this [53:36] developer and the eda and the [53:39] city. Uh, to explore a [53:40] development opportunity at the [53:41] southwest corner of what we [53:45] call the Hardman Triangle. Um [53:46] Key provisions of the agreement, [53:49] the eda in the city for this [53:51] agreement agreed to provide the [53:53] developer with various studies [53:55] and data and reports about the [53:58] conditions impacting the site [53:59] and impacting the development. [54:01] The eda and City agreed to [54:02] identify and evaluate potential [54:04] public costs that might be [54:06] associated with pursuing the [54:08] developments such as new [54:10] streets or utility extensions [54:11] to serve the development and [54:13] the eda and the city agreed to [54:16] negotiate in good faith. Uh, [54:18] the execution of a purchase and [54:19] development agreement or, uh, [54:22] agreements plural. The [54:24] agreement also obligates the [54:26] developer to develop and submit [54:27] development plans for city [54:30] approvals in a timely fashion, [54:31] uh, to conduct their own due [54:33] diligence on the feasibility of [54:36] the development. Uh, to obtain [54:37] financing to complete the [54:39] project, and similarly to [54:41] negotiate in good faith with [54:43] the eda and cities towards the [54:43] purchase and development [54:49] agreement or agreements. A [54:51] couple of other key provisions, [54:54] the agreement itself is [54:55] effective through AUGUST 30th [54:58] of 2025, the developer has [55:00] indicated a desire to uh [55:02] hopefully break ground in the [55:05] late 2nd quarter to early 3rd [55:10] quarter of 2025. The agreement [55:11] proposes option payments [55:12] $15,000 due at execution. This [55:15] would, uh, be, uh, not only to [55:17] secure that exclusive right to [55:18] pursue the development of this [55:20] property, but also, uh, to [55:22] cover any of the EDAs or the [55:23] city [55:24] s administrative costs [55:25] that might be associated with [55:28] reviewing this development such [55:29] as financial consultants. [55:29] There [55:30] s a master plan that [55:30] we [55:32] re looking at as well on the [55:34] eda agenda tonight, uh, some of [55:34] those other administrative [55:39] costs. In addition to that [55:41] $15,000 if the agreement is not [55:43] terminated before these [55:45] milestone dates additional [55:47] $5000 progress payments to keep [55:50] the site under option are due [55:53] on JANUARY 1st of 25, APRIL 1st [55:58] of 25, and JULY 1st of 25. [56:01] Final point, um, The agreement [56:02] itself does contemplate and [56:04] acknowledge that there MAY be a [56:06] request in the future for [56:08] potential financial assistance, [56:09] whether that [56:10] s through various [56:12] grant and loan programs that [56:15] the eda is aware of or through [56:17] the establishment of tax [56:18] increment finance district for [56:19] the project. The project, as [56:21] you can see, does propose [56:23] multiple phases of mixed-use [56:25] development, uh, the site is, [56:29] as everybody knows, um. A [56:30] former former industrial campus [56:33] location for Swift and Company, [56:35] uh, meat meat processing, uh, [56:37] and we have encountered some [56:38] underground conditions in our [56:40] due diligence of the site in [56:42] our demolition of the buildings [56:43] that were there previously. Uh, [56:45] so there MAY be a need for some [56:46] of those financial assistance [56:48] programs to To make the [56:52] development a reality. If that [56:53] financial assistance is [56:54] ultimately pursued in the [56:56] future. It would require the [57:01] eda to review and approve, uh, [57:02] development plan confirmation [57:04] again independently through our [57:06] financial consultant of any [57:07] financial cost estimates for [57:08] all phases and components of [57:10] the project. And it would [57:11] require its own public hearing [57:13] and review again at a future [57:15] date once some of those terms [57:16] and conditions are, are [57:19] understood. But at this stage [57:21] we are looking for approval, a [57:24] motion to approve a preliminary [57:25] development agreement between [57:29] sas. The city and the eda. Uh, [57:30] which would thereby authorize [57:32] the mayor and the city clerk to [57:34] execute the agreement, subject [57:35] to minor revisions meeting the [57:35] city attorney [57:36] s approval. Happy [57:38] to answer your questions. Thank [57:40] you, MR. Garcia. Very exciting. [57:42] This is, um, can you go back to [57:45] the, the picture and and [57:46] perhaps maybe just go a little [57:47] bit into detail on, on the [57:51] house, yes, and uh what each of [57:53] those would entail just for the, [57:54] for the general public. Thank [57:59] you, yeah, um, the developer is [58:00] 11 NOVEMBER 2024 schematic [58:03] concept for the site, uh, [58:05] proposes a building along [58:07] Concord Street. This would be a [58:08] residential building. Market [58:11] rates. Apartment development, [58:14] about 140 to 150 units total. [58:15] With underground parking under [58:18] building parking. Uh The other [58:20] component of that first phase [58:21] of the development as they [58:21] re [58:24] proposing it is about a 30,000 [58:26] square foot, what they call [58:27] destination retail, uh, right [58:27] now they [58:30] re working with. A [58:30] group that [58:32] s interested in um [58:33] establishing recreational [58:36] indoor sort of commercial [58:37] recreational indoor pickleball [58:39] facilities so folks could go. [58:42] You know, rent a court and [58:44] joined friends for a friendly [58:47] spirited game of pickleball. [58:50] That concept is also tied to an [58:53] independent um full service [58:54] restaurant which has the number [58:58] 4 on the map. On the screen [59:01] should be again about a 300 to [59:02] 5000 square foot full service [59:04] restaurant with um with, you [59:06] know, indoor and outdoor [59:08] seating, uh, full kitchen, uh [59:11] bar that would be Really not [59:12] not directly affiliated with [59:13] the destination retail but [59:14] would have some shared service [59:17] opportunities there. Um And [59:19] then uh with number 2, there [59:20] are housing b, that [59:21] s a [59:23] potential future phase of [59:24] additional residential [59:25] development. This schematic is [59:28] still pretty early. We are [59:29] looking at other concepts for [59:31] the site in terms of how it [59:32] would lay out and uh whether [59:35] all of those buildings would [59:37] actually uh work and fit on the [59:39] site, so this is subject to [59:40] some revision again as we get [59:43] into that due diligence process, [59:46] but um this is again the [59:47] preliminary schematic concept [59:48] really anchored by that that [59:50] housing, that first building [59:52] along Concord Street and the [59:52] destination retail and [59:54] restaurant development. Very [59:58] good, thank you. That, that [59:58] shouldn [59:59] t get people excited. [1:00:03] Um, it should be noted that um. [1:00:04] Economic development has been [1:00:06] working on the Hardmann [1:00:09] Triangle for 7 to 8 years and [1:00:13] this. Agreement is helping us [1:00:14] move that forward, that vision [1:00:17] forward and really is going to, [1:00:21] I believe, um. Catapult that uh [1:00:23] piece of property into more [1:00:24] development New Concord Street, [1:00:25] New Concord Exchange, great [1:00:26] opportunities down there. Thank [1:00:28] you for the presentation. [1:00:29] Questions, comments from [1:00:34] council. Motions Your Honor, [1:00:36] Councilor Sberg, I would so [1:00:39] move approval. Second, moved to [1:00:40] approve by Council s Seber, [1:00:43] seconded by Thompson. Further [1:00:44] discussion, Councilor Murray [1:00:44] Thompson, I [1:00:46] d also like to [1:00:47] basically echo your statements [1:00:49] that I think, you know, for the [1:00:50] public to understand that this [1:00:51] is a really exciting [1:00:52] opportunity, I think, to get [1:00:55] the Harbin Triangle to start [1:00:56] the development that we [1:00:57] ve been [1:00:57] talking about for years, you [1:01:00] know, we have, we have people [1:01:01] living down there now, and now [1:01:02] this is another development [1:01:02] where we [1:01:04] re, we are looking at [1:01:04] potentially getting a [1:01:06] restaurant, uh, retail [1:01:08] destination, a place for people [1:01:10] to go. People somewhere where [1:01:11] people want to go, come into [1:01:13] South Saint Paul and enjoy [1:01:16] something and so this is, I [1:01:17] think, I hope the springboard [1:01:18] to continue to develop in [1:01:20] Harbin Triangle, so, um, I [1:01:20] m [1:01:21] really looking forward to the [1:01:22] development of this project. [1:01:29] Thank you. As am I. Others [1:01:32] Hearing none We have a motion [1:01:33] to second, MS. Werner, please [1:01:35] call the roll. Council member [1:01:37] Thompson. Yes. Council member [1:01:39] Kal Zeski, Mayor Francis, [1:01:41] council member Bakke. Council [1:01:43] member Hanson, Council member [1:01:45] Curg, Council member Pat Gorski. [1:01:48] 70. Thank you very much. Motion [1:01:51] passes. Uh, thank you to, uh, [1:01:54] Zavvi and te Miller Development [1:01:55] for um looking to invest in [1:02:00] South Saint Paul. That does it [1:02:02] for our Business here tonight, [1:02:04] our general business. Uh [1:02:08] council Communications would [1:02:09] like to start. Can [1:02:09] t remember [1:02:11] Kalzewski. Thank you, Your [1:02:13] Honor. Uh, last Thursday, [1:02:14] Halloween over on Marie Avenue [1:02:16] was just fantastic. Did anybody [1:02:17] get a count of how many people [1:02:19] were there. I guess I made it [1:02:22] out about 3000 people. There is [1:02:23] a tremendous crowd there, [1:02:25] tremendous, uh, great night, a [1:02:27] little cold but but great night [1:02:28] and uh everybody had a great [1:02:30] time. Some great costumes there [1:02:36] too. And also my lawn service [1:02:37] note for the communications [1:02:38] keep those leaves out of the [1:02:39] street, please use the compost [1:02:40] site. I [1:02:41] ve been down there a [1:02:43] couple of times. That place is [1:02:45] fantastic. Buck a bag. By big [1:02:46] banks, it [1:02:47] s only $1 so it [1:02:48] s uh. [1:02:49] Well worth it for everybody [1:02:50] down there to dump all the [1:02:52] leaves off. Very good. They can [1:02:54] find that information on our [1:02:56] city website and good luck to [1:02:57] the candidates that are up for [1:03:00] election, so. Thank you, [1:03:02] council member. Others? [1:03:05] Councilor Hanson. Um, first, [1:03:06] I [1:03:09] d like to, um, tell everyone [1:03:11] about Thursday, NOVEMBER 14th, [1:03:12] which is coming up soon. It [1:03:13] s [1:03:15] the South Saint Paul senior [1:03:16] citizens Thanksgiving dinner, [1:03:17] so it [1:03:18] s free for the over 55 [1:03:20] year old group. Sorry, I [1:03:20] m not [1:03:23] going to be here to go, but um [1:03:24] it [1:03:25] s being sponsored by [1:03:26] Protouch Wakota Federal Credit [1:03:28] Union, Lyons, and the partners [1:03:30] of South Saint Paul School [1:03:33] District, Boy Scout to 9095 and [1:03:33] Mayor [1:03:35] s Youth Task Force. You [1:03:36] can find more information on [1:03:37] the website and Facebook if you [1:03:38] need it, but that [1:03:38] s coming up [1:03:39] quick. It [1:03:41] s hard to believe [1:03:42] that it [1:03:42] s practically [1:03:43] Thanksgiving. Um, the other [1:03:43] thing I [1:03:45] d like to mention too [1:03:48] is um council member Kalzowski [1:03:49] talked about Halloween, so I [1:03:52] was at the, the event and Marie [1:03:54] and after was all I went home [1:03:55] and I decided, well I [1:03:56] m gonna [1:03:58] hand out some candy. So I did [1:04:00] and I have to tell you I was so [1:04:02] impressed by all the kids who [1:04:04] came to my door. They were all [1:04:05] always happy, smiling, and from [1:04:07] the littlest to the the older [1:04:10] ones, they were very polite and [1:04:10] I [1:04:12] m just impressed by the, the [1:04:13] kids that came around on [1:04:13] Halloween, and I [1:04:14] ve heard that [1:04:17] from a few other people too, so [1:04:19] kudos to the kids and [1:04:20] appreciate them for how great [1:04:21] they were. Don [1:04:22] t forget to vote [1:04:22] tomorrow. That [1:04:23] s all I can say [1:04:28] about voting. Thank you Council [1:04:29] Councilor Podorski, thank you, [1:04:30] Your Honor. Yeah, I too would [1:04:33] just like to say um thanks for [1:04:34] the Halloween event on Marie [1:04:35] that the city helped sponsor. I [1:04:37] just want to thank our staff [1:04:39] and, uh, the volunteer [1:04:41] businesses, uh, because without [1:04:42] those businesses and and others [1:04:43] helping put it together it [1:04:44] really wouldn [1:04:44] t be the great [1:04:46] success, um, that it is so [1:04:48] great to see, uh, kids and [1:04:49] family out on a, a little [1:04:52] chilly night as, uh, council [1:04:53] member Kalzewski said that we [1:04:53] were handing out candy together [1:04:56] for a little while and um It [1:04:58] was a little chilly at times [1:04:59] when the wind would pick up, [1:05:01] but great to see the, the kids [1:05:02] out there, just want to say [1:05:04] thanks again to all those that [1:05:05] helped participate in that. And [1:05:07] yes, um, I also would like to [1:05:10] say get out and vote and let [1:05:11] s [1:05:12] stay friends after tomorrow, uh, [1:05:15] NOVEMBER 5th, um, I think [1:05:16] people are staying pretty [1:05:18] respectful, but please try and [1:05:19] be respectful to your neighbors, [1:05:21] family, friends, and voting [1:05:23] staff, uh, as well. I know, um, [1:05:25] a number of people are feeling [1:05:26] like this is some challenging. [1:05:28] Times and people are maybe [1:05:29] getting a little tired of uh [1:05:32] some of the the rhetoric that [1:05:33] goes along with elections, but, [1:05:35] um, I [1:05:36] m looking forward to it [1:05:38] being done, and I know a lot of [1:05:38] other people are as well, and [1:05:39] we [1:05:41] re gonna get through this [1:05:41] all together, so thank you, [1:05:44] Your Honor. Very good. Thank [1:05:47] you. Councilor Bakken. Sure, [1:05:47] I [1:05:49] ll go. Um, I think a good [1:05:52] number of us were at the great [1:05:53] Halloween get-together and uh [1:05:55] My plus one was with me, and I [1:05:57] think we might have beat you [1:05:59] all with how much candy we [1:06:00] handed out, but you know, [1:06:01] that [1:06:02] s just, um, but the, you [1:06:04] know, the costume, I love, I [1:06:07] love seeing the Old school [1:06:08] costumes maybe, and then the [1:06:10] fancier ones and I think I [1:06:11] counted like 8 bananas. I mean, [1:06:12] who doesn [1:06:13] t want to be a banana [1:06:17] for Halloween. So, um, that, uh, [1:06:20] it just as always a fun event. [1:06:23] It was the 23rd annual, uh, get [1:06:25] together, and I remember the [1:06:26] first annual get-together when [1:06:29] all of our kids were small, and [1:06:30] so I think it [1:06:32] s very cool that [1:06:34] kids that have attended that [1:06:35] when it was a um a beginning [1:06:37] tradition. Um, brought their [1:06:38] own kids, um, that evening as [1:06:39] well, and that [1:06:39] s kind of what [1:06:41] South Saint Paul is all about, [1:06:42] you know, um, growing up here [1:06:45] and. Raising your family here, [1:06:47] um. Speaking of voting, yes, [1:06:50] please go out and vote. However, [1:06:52] I would like to just take a hot [1:06:53] minute to say thank you to [1:06:58] Deanna. And your staff. And the [1:07:00] election judges, I mean, we [1:07:00] ve [1:07:03] had a banner turnout here at [1:07:05] City Hall and you were open [1:07:06] Saturday and Sunday. I heard [1:07:08] you were here all day yesterday, [1:07:11] so I just want to commend, um, [1:07:14] your, uh, role in all of this. [1:07:16] I actually attended the [1:07:18] election integrity, uh, Deal [1:07:21] you put on to watch how our, um, [1:07:23] you know, our machines work. [1:07:24] And there [1:07:25] s just a lot of [1:07:28] behind the scenes that happens [1:07:30] and I just appreciate you and [1:07:30] everything you [1:07:31] ve done, and [1:07:32] just your knowledge about the [1:07:34] whole thing, how you did that [1:07:35] whole meeting. I was just like, [1:07:38] look at her ghost. So perhaps, [1:07:40] props to you and thank you and [1:07:44] I hope you survive tomorrow. Me [1:07:44] too. That [1:07:45] s all. Thank you very [1:07:46] much. That [1:07:48] s my receiver. [1:07:49] Thanks, Your Honor. There [1:07:50] s [1:07:51] been almost 1.4 million people [1:07:54] that took advantage of early [1:07:55] voting according to the latest [1:07:56] statistics from the state. I [1:07:59] saw earlier today, I think it [1:08:02] was 1,372,000, which is about [1:08:05] 35% of the electorate. So it [1:08:05] s [1:08:07] an awesome thing. We [1:08:08] re looking [1:08:09] forward to tomorrow. Keep in [1:08:10] mind that it [1:08:12] s your friends and [1:08:15] neighbors that are working the [1:08:16] polling locations in South [1:08:17] Saint Paul. They don [1:08:17] t have a [1:08:18] preconceived agenda. There [1:08:19] s [1:08:21] people from every party there [1:08:22] working on behalf of doing this. [1:08:24] A number of them have [1:08:26] volunteered for years. So get [1:08:29] out, do your job. Your civic [1:08:32] duty and vote, um, and to, to [1:08:33] my friends here that are [1:08:36] running, best of luck to [1:08:38] everybody that has put their [1:08:40] name in to be considered for [1:08:42] counsel or mayor or school [1:08:44] board, it takes courage to do [1:08:47] that. Thank you for doing that. [1:08:47] It [1:08:50] s not easy in 2024 with all [1:08:53] of the digital means to [1:08:54] question things. A lot of the [1:08:56] discussion is good. It [1:08:56] s [1:08:57] constructive. Some of it you [1:09:00] kind of wonder what planet it [1:09:00] s [1:09:02] coming from, but Um, at the end [1:09:03] of the day, it [1:09:04] s a democratic [1:09:06] process that we have, and it [1:09:07] s [1:09:09] extremely important for us to [1:09:10] continue that democratic [1:09:11] process, not only in South [1:09:13] Saint Paul and Dakota County in [1:09:15] Minnesota, but in the United [1:09:15] States, it [1:09:16] s a fair and free [1:09:21] election. Make sure that we [1:09:22] exercise our constitutional [1:09:23] right to vote, and we [1:09:23] ll see [1:09:25] where the chips fall, but we [1:09:25] re [1:09:26] looking forward to the future [1:09:28] here in South Saint Paul. And [1:09:30] again, thank you to the [1:09:31] election officials and to our [1:09:31] team that [1:09:32] s put in so much work. [1:09:35] It truly is in our community [1:09:37] and with the number of team [1:09:38] members. I always call them [1:09:40] team members, and not just [1:09:41] staff, they [1:09:42] re team members [1:09:43] that we have. It [1:09:44] s an all hands [1:09:47] on deck process. We don [1:09:48] t have [1:09:50] a department of 100 people [1:09:51] working on elections. We [1:09:51] ve got [1:09:54] a team at City Hall under the [1:09:56] direction of the city clerk [1:09:58] that works on elections, and we [1:10:00] appreciate you and we want to [1:10:01] thank the buildings that allow [1:10:04] us To go in and conduct [1:10:05] elections on election day in [1:10:08] the primary, so. Thank you, [1:10:10] Your Honor. Very well, thank [1:10:12] you, Councilor Thompson. Uh, [1:10:14] slow day in the news for me [1:10:15] today, I guess. Um, I guess the [1:10:17] one thing I do want to say is, [1:10:20] I want to say again, thank you [1:10:23] to MS. Warner and her excellent [1:10:25] staff for their hard work, um, [1:10:25] they [1:10:26] ve, they [1:10:26] ve gone through [1:10:27] some tremendous numbers in just [1:10:28] one building, you know, so we [1:10:29] have, how many, how many [1:10:32] precincts again? 5 precincts, [1:10:34] but over 2000 early votes, [1:10:35] right? 2000 early votes. I mean, [1:10:36] so that [1:10:37] s, that [1:10:37] s tremendous [1:10:39] all coming in here to get the [1:10:42] job done, um, so I just want to [1:10:43] thank staff and, uh, the [1:10:44] election judges for putting [1:10:45] their time and effort and [1:10:46] energy into this and making [1:10:48] sure that there is a good [1:10:50] honest selection here, um, [1:10:50] that [1:10:52] s all I have. Thanks. Very [1:10:53] good. Thank you. I would like [1:10:56] to thank the team, uh, all [1:10:58] departments actually the [1:10:59] engineering department at this [1:11:00] time of year, year after year, [1:11:01] we button up all these big [1:11:03] projects that we started and [1:11:05] your team has a lot to do with. [1:11:06] Orchestrating those and trying [1:11:08] to keep everybody on time and [1:11:12] keeping Keeping the issues low [1:11:14] and the progress high and [1:11:14] sometimes those don [1:11:15] t [1:11:15] correspond, but I, I, you, [1:11:15] you [1:11:17] ve all done a really good [1:11:19] job, uh, not only your [1:11:20] department but the water [1:11:22] department and all the public [1:11:23] works department who are doing [1:11:25] all of those things on the [1:11:26] backside that we don [1:11:27] t see, um, [1:11:29] many times in the middle of the [1:11:31] night, many times early in the [1:11:32] morning when contractors need [1:11:33] to get things started. So thank [1:11:34] you and please pass that along [1:11:36] to your, to your team. Because [1:11:39] it does take all of us to make [1:11:41] this happen and it is um I [1:11:41] m [1:11:44] quite proud of the work that [1:11:44] You [1:11:45] ve all done making sure all [1:11:48] these things happen every year [1:11:48] and now we [1:11:49] re going to start [1:11:51] preparing our public works [1:11:52] department for snow and the [1:11:53] winter and the cold and the ice [1:11:56] and so all those things are [1:11:58] coming together now in NOVEMBER [1:11:59] and so I just want to recognize [1:12:01] those staff members that are [1:12:02] that are continually working [1:12:03] hard for us and those that back [1:12:05] them up, and of course, it [1:12:06] s [1:12:08] been said about our, our city [1:12:09] clerk and all the work that [1:12:09] that she [1:12:11] s been doing and her [1:12:13] team have some grace. With [1:12:15] people if things are a little [1:12:16] long tomorrow if if things [1:12:16] aren [1:12:17] t, uh, you make a mistake, [1:12:17] it [1:12:18] s ok, have some grace with [1:12:20] yourself, go back and work out [1:12:22] to get another ballot and and [1:12:23] redo that. Don [1:12:25] t be afraid to [1:12:26] ask ask questions if you [1:12:27] re, if [1:12:27] you [1:12:27] re concerned about [1:12:30] something, they are all trained [1:12:31] and are are there helping and [1:12:32] as council member s Seberg said, [1:12:35] they are. All of them are our [1:12:36] neighbors. These aren [1:12:36] t flown [1:12:38] in people. These aren [1:12:38] t [1:12:39] professionals. These are moms, [1:12:41] dads, uncles, neighbors that [1:12:43] are that are out there doing [1:12:45] this on our behalf to make sure [1:12:46] that everything goes well, so [1:12:47] thank you to them and thank you [1:12:49] to you all for getting out and [1:12:51] exercising your vote. With that, [1:12:56] uh, I look for a motion to [1:12:56] adjourn our council meeting [1:12:58] that was moved by council [1:12:59] member Serg, seconded by [1:13:02] Councilmember Kalzeki. All in [1:13:04] favor of adjournment. Any [1:13:07] oppose? Meeting is adjourned. [1:13:10] We will Thank you very much. We