1 00:00:07,060 --> 00:00:17,280 I'm in place for the city of Saint Helena planning commission regular meeting, Tuesday July 21, 26. I'm calling the meeting to order. 2 00:00:18,100 --> 00:00:21,040 Commissioner Ferdek, would you like to, 3 00:00:22,420 --> 00:00:23,780 you'd have some much of allegiance? 4 00:00:24,460 --> 00:00:24,940 Sure. 5 00:00:26,440 --> 00:00:28,720 I did the last time. 6 00:00:31,060 --> 00:00:32,060 I play a lot of allegiance. 7 00:00:32,660 --> 00:00:33,100 I play allegiance to slide. 8 00:00:33,640 --> 00:00:34,940 I play allegiance to America. 9 00:00:35,300 --> 00:00:38,620 I need to do it with our public for which this is a one nation. 10 00:00:39,760 --> 00:00:43,300 If it is a little, whatever you do, it's just a small one. 11 00:00:43,860 --> 00:00:44,540 Thank you. 12 00:00:44,540 --> 00:00:49,100 How would you like to call the roll, please? 13 00:00:50,380 --> 00:00:51,500 Commissioner Covell. 14 00:00:51,880 --> 00:00:51,960 Here. 15 00:00:52,660 --> 00:00:53,160 Commissioner Lopez. 16 00:00:53,700 --> 00:00:53,820 Here. 17 00:00:54,500 --> 00:00:55,340 Nice chair for it. 18 00:00:55,720 --> 00:00:55,880 Yeah. 19 00:00:56,220 --> 00:00:56,720 Chair Warner. 20 00:00:57,200 --> 00:00:57,460 Here. 21 00:00:57,900 --> 00:00:58,520 Thank you. 22 00:00:58,620 --> 00:00:59,160 Thank you. 23 00:00:59,540 --> 00:01:02,660 And through the chair, Lee's a McIll director of community development. 24 00:01:03,420 --> 00:01:12,660 I did want to just let the commission know that Commissioner Anderson did formally resign from the planning commission due to personal reasons. 25 00:01:12,660 --> 00:01:18,320 So, with that being said, we will miss her, she has done a wonderful job, my understanding 26 00:01:18,320 --> 00:01:23,780 over several years here at the city, and we do have an opening for the Planning Commission. 27 00:01:24,000 --> 00:01:27,920 So, I'll mention that again during my report, but I did want to let the Commission and the 28 00:01:27,920 --> 00:01:31,200 public know that's why Ms. Anderson isn't here. 29 00:01:31,400 --> 00:01:32,120 Thank you. 30 00:01:32,520 --> 00:01:38,860 And I think some of us would like to probably have some kind of tribute and gift for Commissioner 31 00:01:38,860 --> 00:01:39,160 Anderson. 32 00:01:39,160 --> 00:01:42,300 And we can discuss that later in another forum. 33 00:01:42,460 --> 00:01:43,680 Thank you very much for the announcement. 34 00:01:44,680 --> 00:01:46,880 OK, this is a time and place for the public forum. 35 00:01:46,920 --> 00:01:49,240 This is an opportunity for the public to address the commission 36 00:01:49,240 --> 00:01:53,480 on items of interest to the public that are not listed on the agenda 37 00:01:53,480 --> 00:01:56,220 because of restrictions imposed by the Brown Act. 38 00:01:56,260 --> 00:01:58,680 The commission may not engage in discussion or take action 39 00:01:58,680 --> 00:02:00,440 on matters not described on the agenda. 40 00:02:01,140 --> 00:02:03,820 If there is anyone who does have any public forum comments, 41 00:02:03,900 --> 00:02:06,180 please limit your time limit to four minutes. 42 00:02:06,180 --> 00:02:11,880 Does anyone have any public forum comments seeing none? 43 00:02:12,160 --> 00:02:16,460 We can go on to the approval of the minutes. 44 00:02:17,340 --> 00:02:23,240 Have you all reviewed the minutes and have any changes or any amendments? 45 00:02:24,900 --> 00:02:30,220 Given that I was absent for that meeting, I won't be by refusing myself on that, but I 46 00:02:30,220 --> 00:02:32,980 would entertain a motion for approval the minutes. 47 00:02:34,260 --> 00:02:41,520 But really quick, Chair, if you read the minutes, you are able to vote on that. 48 00:02:41,820 --> 00:02:43,320 Okay, thank you. 49 00:02:44,720 --> 00:02:44,800 Yeah. 50 00:02:45,920 --> 00:02:48,140 But then we approve the minutes as written. 51 00:02:49,020 --> 00:02:49,780 Do we have a second? 52 00:02:50,620 --> 00:02:51,000 Second. 53 00:02:51,920 --> 00:02:53,240 Please call the roll. 54 00:02:54,380 --> 00:02:55,420 Commissioner Cabal? 55 00:02:56,100 --> 00:02:56,160 Yes. 56 00:02:56,540 --> 00:02:57,180 Commissioner Lopez? 57 00:02:57,680 --> 00:02:57,980 Yes. 58 00:02:58,180 --> 00:02:59,060 Vice Chair Ferdick? 59 00:02:59,660 --> 00:02:59,860 Yes. 60 00:03:00,180 --> 00:03:00,660 Chair Warner? 61 00:03:01,140 --> 00:03:01,400 Yes. 62 00:03:01,560 --> 00:03:02,740 The motion passes unanimously. 63 00:03:04,040 --> 00:03:04,680 Thank you. 64 00:03:04,680 --> 00:03:10,780 And we'll go on to our public hearings on agenda item 5.1. 65 00:03:11,160 --> 00:03:15,680 Before we consider the item, I do want to just disclose that I have a personal 66 00:03:15,680 --> 00:03:19,800 friendship with the applicant, I have known her for many years, I've not been involved 67 00:03:19,800 --> 00:03:25,100 or spoken with her or had any contact with her regarding the application and I feel that 68 00:03:25,100 --> 00:03:29,480 I can be objective and not personally involved in reviewing the application on behalf of 69 00:03:29,480 --> 00:03:29,840 the commission. 70 00:03:30,240 --> 00:03:31,260 So that's my announcement. 71 00:03:31,260 --> 00:03:34,460 So, we go on to a staff person. 72 00:03:34,520 --> 00:03:40,720 I will add that I am also personal friends with the applicant and we did have some discussions 73 00:03:40,720 --> 00:03:47,180 when she was considering putting in an application more informational, who should she talk 74 00:03:47,180 --> 00:03:54,120 to, did inquire about part of the code and I directed her to Jackie Annadly. 75 00:03:55,300 --> 00:03:55,600 Very good. 76 00:03:55,600 --> 00:03:58,420 Any other announcements by Commissioner Sugarding this item? 77 00:03:58,580 --> 00:04:00,320 If not, we can move on to the staff presentation. 78 00:04:00,320 --> 00:04:04,000 Thank you chair Warner, Lisa McCyle, Director of Community Development. 79 00:04:04,380 --> 00:04:09,120 We have with us tonight assistant planner, Natalie Brissie, who will provide a presentation 80 00:04:09,120 --> 00:04:13,300 and overview and she'll be available for any questions of the commission. 81 00:04:15,320 --> 00:04:16,540 Good evening commissioners. 82 00:04:17,460 --> 00:04:21,980 As Dr. McCyle said, tonight before you we have a new short-term room tool permit application. 83 00:04:23,560 --> 00:04:27,040 The address that this is located at is 1248 Stockton Street. 84 00:04:27,040 --> 00:04:31,400 The residents is an existing two-bedroom one-and-a-half bathroom. 85 00:04:31,820 --> 00:04:37,300 However, the applicant is desiring to rent the property as a one-bedroom one-and-a-half 86 00:04:37,300 --> 00:04:38,740 bathroom with an office. 87 00:04:40,320 --> 00:04:47,640 So anything with our code determining the maximum occupancy, we limited it to the one-bedroom 88 00:04:47,640 --> 00:04:49,520 instead of the two bedrooms. 89 00:04:50,680 --> 00:05:06,740 Additionally, the property has one on-site parking space at this time and if approved, the applicant is proposing to remove and existing shed that's on-site at the beginning at the front of the property. 90 00:05:07,240 --> 00:05:10,500 As you can see up on the screen, there's a picture of the frontage. 91 00:05:10,780 --> 00:05:13,960 It's over on the left-hand side of the image. 92 00:05:13,960 --> 00:05:21,980 It's kind of behind those little shrubs, you can see right here, but she's proposing to remove that to create the additional required parking space. 93 00:05:23,880 --> 00:05:28,880 As for the project location, it is located as I said on Stockton Street. 94 00:05:29,440 --> 00:05:36,140 It's zoned medium density residential, and it also has a general plan designation of medium density residential. 95 00:05:36,140 --> 00:05:45,440 And as I said, the properties being proposed as a one bedroom, one and a half bathroom with an office with only one parking space at this time. 96 00:05:47,160 --> 00:05:57,920 This is the site plan. As you can see over in the lower left corner of the plan, there is the existing parking space annotated in yellow. 97 00:05:57,920 --> 00:06:07,540 The proposed, where the, and that's where the parked car is in the image, the proposed parking space you can see is showing on the screen in a hatch and orange. 98 00:06:08,080 --> 00:06:14,240 That is where the shed is located. Other than that there would be no alterations to the site if proposed. 99 00:06:16,040 --> 00:06:17,540 Here's the existing floor plan. 100 00:06:18,420 --> 00:06:30,120 The front right room is the office with a day bed that will not be used to rent out with the short-term rental, but the back bedroom on the right-hand side will be. 101 00:06:34,120 --> 00:06:40,560 Staff evaluated the project against each of the required findings and determined that the project needs all findings for approval. 102 00:06:41,380 --> 00:06:49,160 The with the exception that the current parking situation be amended if approval to provide the two onsite parking spaces. 103 00:06:49,160 --> 00:06:58,240 In addition, staff finds that the project complies with all other aspects of the municipal code is consistent with the general plan. 104 00:06:58,740 --> 00:07:02,500 It's compatible with the surrounding neighborhood and meets all required findings. 105 00:07:06,370 --> 00:07:14,230 Staff further recommends approving the short-term rental at 1248 stocked industry, including action to approve a categorical exemption 106 00:07:14,230 --> 00:07:23,390 to the state-sequite guidelines based on findings and subject to the conditions of approval and staff is available for any questions and the applicant is here as well. 107 00:07:23,930 --> 00:07:27,350 Through the chair I'll just supplement for the commission a little bit more. 108 00:07:27,630 --> 00:07:37,810 The conditions of approval that have been presented to the commission are the standard conditions that are imposed upon all of the short-term rental permits as of present. 109 00:07:38,330 --> 00:07:42,430 Um, these could change later when we go through our ordinance amendments, you know, which 110 00:07:42,430 --> 00:07:47,950 is not agenda this evening, but we are in discussions about how these are operated, moving 111 00:07:47,950 --> 00:07:48,610 into the future. 112 00:07:48,730 --> 00:07:53,090 But this is under our current ordinance and set of standard conditions. 113 00:07:53,610 --> 00:07:57,170 It's at the pleasure of the commission if it's, if it's so chooses to amend any of them 114 00:07:57,170 --> 00:07:57,870 now as well. 115 00:07:59,710 --> 00:08:04,790 Okay, let's, before we have any public comment, um, I'll open it up for any clarifying questions 116 00:08:04,790 --> 00:08:06,390 from commissioners. 117 00:08:06,570 --> 00:08:08,930 I will have one, but I'll defer to my fellow commissioners first. 118 00:08:10,210 --> 00:08:18,750 So, as far as the parking, my understanding is that when it's rented, why would we need, 119 00:08:18,830 --> 00:08:24,370 I mean, why would you need to add an extra parking, is it because of using the office end? 120 00:08:32,440 --> 00:08:42,240 Sorry, so with the, so in the conditions of approval, the maximum occupancy allowed based off of the one bedroom rentals space, 121 00:08:42,240 --> 00:08:50,580 would be for persons. And in that regard, that could be possibly two groups with each 122 00:08:50,580 --> 00:08:55,360 of car. It could be if it's only two occupants, each person could have a car, but the 123 00:08:55,360 --> 00:09:00,720 requirement and the code is that they do provide two onsite parking spaces regardless of 124 00:09:00,720 --> 00:09:05,840 the bedroom count. And so that's why the one space is being added to the property. 125 00:09:08,790 --> 00:09:10,650 Other clarifying questions? 126 00:09:10,850 --> 00:09:21,650 I'll just ask one, I think it's in the conditions, but the applicant has 60 days to put in that second parking spot from the approval of the application is that correct? 127 00:09:21,950 --> 00:09:23,290 Yes, I believe so, from approval. 128 00:09:24,950 --> 00:09:27,610 I had one clarifying question just as to the process. 129 00:09:29,590 --> 00:09:36,770 So, are there any other pending short-term rental applications that have preceded this application 130 00:09:36,770 --> 00:09:39,650 and being complete in time. 131 00:09:41,550 --> 00:09:48,430 No, so with our wait list we only reach out to the amount of spots that we have and we give them a certain window to apply. 132 00:09:49,270 --> 00:09:55,910 So we have one other that's in process that we're that's being reviewed but other than that, no. 133 00:09:56,230 --> 00:10:01,170 So we generally process these first in time when they're complete is that correct? 134 00:10:01,570 --> 00:10:01,810 Yes. 135 00:10:02,970 --> 00:10:03,150 Okay. 136 00:10:03,150 --> 00:10:10,370 Right now, we're operating under the cap of 25 short-term rentals, so this is the 24th. 137 00:10:10,370 --> 00:10:11,910 There's one more in line. 138 00:10:12,070 --> 00:10:16,710 Yeah, very good. Thank you. Any other clarifying questions before you open it up for a comment? 139 00:10:17,290 --> 00:10:29,190 In regards to your comment, Dr. Ramisa, when the new SDR ordinance goes into effect, will that be retroactive? 140 00:10:29,190 --> 00:10:34,190 or do people or people grandfathered into this or how does that work? 141 00:10:34,770 --> 00:10:39,090 Potentially, they might be affected that's something that we will consider and will be 142 00:10:39,090 --> 00:10:45,010 before the city council. A lot of the review of the short-term rental ordinance and process will 143 00:10:45,010 --> 00:10:51,210 be evaluating all of our existing short-term rental permits as well in compliance with codes. 144 00:10:51,630 --> 00:10:59,150 But we're not speaking to that today, but we would be looking at all of the existing short-term 145 00:10:59,150 --> 00:11:02,450 as part of the short-term rental update. 146 00:11:02,970 --> 00:11:04,530 Let me just follow up that question. 147 00:11:04,750 --> 00:11:07,490 Is it your position that the city has the ability 148 00:11:08,310 --> 00:11:11,510 to retroactively change vested rights in a permit? 149 00:11:12,810 --> 00:11:14,890 So these have compliance requirements. 150 00:11:15,030 --> 00:11:20,590 All of these permits have requirements to comply 151 00:11:20,590 --> 00:11:22,130 with all their conditions of approval 152 00:11:22,130 --> 00:11:23,890 and with the existing ordinance. 153 00:11:24,190 --> 00:11:27,570 So I'm not taking any position as of right now, 154 00:11:27,570 --> 00:11:33,510 But we will be looking at this question through the process of our ordinance update. 155 00:11:34,070 --> 00:11:42,970 Okay, I think it's good to kind of assess that because a lot of our applicants rely on the vested rights that are given to them when they have approved permits. 156 00:11:43,850 --> 00:11:46,770 Any other public comments or questions before we open it up? 157 00:11:47,050 --> 00:11:50,690 Any other commissioner comments or questions before you open it up for any public comment? 158 00:11:51,090 --> 00:11:53,630 Chair Warner, I would only add to your comment that 159 00:11:53,630 --> 00:12:00,670 I think it would be reasonable for any permit holder to follow any of the conditions and obligations 160 00:12:00,670 --> 00:12:07,750 and if they're amended, and we're not talking about that right now, but then everyone would 161 00:12:07,750 --> 00:12:10,370 need to be in compliance at the same level. 162 00:12:10,850 --> 00:12:16,650 Again, my question is just solely the legal question about vested rights and whether that 163 00:12:16,650 --> 00:12:17,770 should or should not be. 164 00:12:17,970 --> 00:12:23,570 Speaking under the existing ordinance today, there's a renewal requirement. 165 00:12:24,230 --> 00:12:28,370 So you're not guaranteed every year that your permit is re-granted. 166 00:12:28,910 --> 00:12:34,070 So there is opportunity, this particular application that's before the planning commission 167 00:12:34,070 --> 00:12:40,230 this evening, and they're upon their renewal period, they'll need to illustrate that they're 168 00:12:40,230 --> 00:12:40,730 complying. 169 00:12:41,490 --> 00:12:42,530 That's a very good point. 170 00:12:42,610 --> 00:12:43,190 Thank you, Director. 171 00:12:44,310 --> 00:12:51,190 Any other commissioner comments, if not, I'll open up for public comment, including any comments by the applicant, 172 00:12:55,210 --> 00:13:00,830 if you would like to state your name for the record. 173 00:13:01,890 --> 00:13:05,570 Elaine Honig, so I'm applying for the short term rental permit. 174 00:13:06,450 --> 00:13:12,670 It's essentially a one bedroom house with an office, so my hope is to only run it to couples, 175 00:13:12,870 --> 00:13:15,930 you know, or single people and not have a lot of people in it. 176 00:13:17,370 --> 00:13:21,050 And again, I have a shed and some roses on the left, which I'll rip out. 177 00:13:21,290 --> 00:13:25,190 I wanted to wait and do that until I knew I would get the permit because I thought, 178 00:13:25,250 --> 00:13:27,710 if I don't get the permit, there's no point in ripping it out. 179 00:13:28,890 --> 00:13:35,550 However, if anybody were ever to change that, I think the house looks better with the 180 00:13:35,550 --> 00:13:38,790 roses in the one parking space is opposed to the two, 181 00:13:39,050 --> 00:13:42,490 but it's an aesthetic choice, and I'm happy to comply with code. 182 00:13:44,030 --> 00:13:44,970 And I think that's about it. 183 00:13:44,970 --> 00:13:48,130 I live there, so my hope is to rent it while I live there, 184 00:13:48,330 --> 00:13:52,570 and then do eventually at some point, I don't know if I'll stop living there, 185 00:13:53,090 --> 00:13:54,270 and rent it more. 186 00:13:54,690 --> 00:13:57,150 So I'm going to kind of feel it out. 187 00:13:58,050 --> 00:13:59,330 So that's my plan. 188 00:13:59,610 --> 00:14:01,150 Yeah, thank you, Ms. Hullick. 189 00:14:02,330 --> 00:14:05,230 If no other public comments, let's bring it back 190 00:14:05,230 --> 00:14:10,810 to for consideration by the commission. Any further discussion by the commission or by staff? 191 00:14:10,890 --> 00:14:14,870 Through the chair just to check that there's no public comments through the public hearing. 192 00:14:15,330 --> 00:14:20,530 Don't think that's there. There are no written public comments. And to just clarify that appropriate 193 00:14:20,530 --> 00:14:26,950 notice I was verified have been provided to neighbors correct. That's correct. 194 00:14:27,830 --> 00:14:34,430 Okay. Any further discussion? If not, I'll go ahead. I also like, well, 195 00:14:35,450 --> 00:14:40,430 aesthetically, and I don't know the code-wise, aesthetically, I like the balance of the look of it. 196 00:14:41,290 --> 00:14:47,510 You know, the lot and the green is kind of shame that we have to throw another parking space, 197 00:14:47,650 --> 00:14:56,170 I think that when you think about the parking, it's usually more congested areas that are bigger that need it, but no. 198 00:14:56,970 --> 00:14:58,350 Yeah, it's kind of a shame. 199 00:14:59,450 --> 00:14:59,950 But I guess if... 200 00:15:00,000 --> 00:15:09,580 That's kind of what the rules are. Other comments or discussion? If not, I'll entertain a motion on this application. 201 00:15:12,920 --> 00:15:20,820 I'll make a motion to approve the application for the short-term rental permit. That's before us. 202 00:15:21,200 --> 00:15:26,520 I second. Any further discussion? If not, please call the roll. 203 00:15:28,660 --> 00:15:31,500 Commissioner Colwell, yes, Commissioner Lopez? 204 00:15:32,320 --> 00:15:32,600 Yes. 205 00:15:32,860 --> 00:15:33,740 Vice Chair Ferdick? 206 00:15:34,340 --> 00:15:34,360 Yes. 207 00:15:34,600 --> 00:15:35,100 Chair Warner? 208 00:15:35,420 --> 00:15:35,640 Yes. 209 00:15:35,860 --> 00:15:37,040 The motion passes unanimously. 210 00:15:38,000 --> 00:15:39,040 Thank you very much. 211 00:15:39,900 --> 00:15:42,800 Congratulations on the 24th permit. 212 00:15:43,640 --> 00:15:45,860 And thank you staff for good work on this. 213 00:15:46,640 --> 00:15:46,880 Okay. 214 00:15:47,180 --> 00:15:50,120 We'll move on to the next item, which I understand is informational. 215 00:15:50,120 --> 00:15:58,220 only is it, and a presentation regarding the Napa County hazard mitigation plan. Any 216 00:15:58,220 --> 00:16:03,360 introduction director for that? Yes. So, Lisa McIll Director, community 217 00:16:03,360 --> 00:16:09,660 development. We have with us this evening as a courtesy, Brianna Jones, and she's 218 00:16:09,660 --> 00:16:16,780 going to conduct a presentation for you all on the county's multijuristic 219 00:16:16,780 --> 00:16:24,800 has her mitigation plan. I will just preface before she begins noting that I have left the commission 220 00:16:24,800 --> 00:16:30,660 know I would be bringing some informational items throughout the year. Their educational information 221 00:16:30,660 --> 00:16:37,200 or they're not for deliberation or really discussion for the commission to provide 222 00:16:37,200 --> 00:16:44,300 direction or anything but it's to gain perspective and understanding of what we have going on 223 00:16:44,300 --> 00:16:46,340 regionally in our valley here. 224 00:16:46,920 --> 00:16:54,000 We also have with us Chief Sorenson from the Fire Department and interim Chief Tharp from the 225 00:16:54,000 --> 00:16:55,280 Police Department as well. 226 00:16:55,740 --> 00:17:00,300 If there's some more local questions that you all have, they'd be happy to answer some of those 227 00:17:00,300 --> 00:17:00,920 as well. 228 00:17:01,540 --> 00:17:07,800 We're not deliberating over previous projects or conditions of approval. 229 00:17:08,060 --> 00:17:14,280 This is again just informational and we're really excited to have Brianna join us here. 230 00:17:14,280 --> 00:17:16,280 And may I ask one clarifying question? 231 00:17:16,460 --> 00:17:17,040 Am I correct? 232 00:17:17,200 --> 00:17:27,020 And maybe she'll deal with this, is that this particular version of the house mitigation plan will at some point go before the city council correct? 233 00:17:29,530 --> 00:17:31,110 For the St. Alina portion? 234 00:17:32,130 --> 00:17:34,110 I'm not sure if it does, but yes. 235 00:17:34,150 --> 00:17:35,170 She can address that. 236 00:17:35,710 --> 00:17:41,390 To your point about deliberation, it's not like this is going to not be deliberated on by the city in some form. 237 00:17:41,390 --> 00:17:51,390 I understand each jurisdiction that participates in the multi-jouristictional planning of this and comes back when there's a final graph and a 238 00:17:52,470 --> 00:17:54,450 Dopcyt or doesn't adopt it 239 00:17:54,450 --> 00:17:55,190 That's correct 240 00:17:55,190 --> 00:18:05,610 I'm going to go quick so just before before we begin so we have again Brianna Jones here. She's joining us as a courtesy really excited to have her here 241 00:18:05,610 --> 00:18:11,450 this is the first informational session that we're having here with the planning commission and 242 00:18:13,210 --> 00:18:19,930 we'll welcome her, so hand it over to her. Welcome. I have one quick question, who is our representative from 243 00:18:19,930 --> 00:18:20,750 Sainhalina? 244 00:18:22,570 --> 00:18:29,650 On this. So there's a few different people. Originally it was your city manager. I don't know how that's 245 00:18:29,650 --> 00:18:38,370 change, there has been some change within your city management, however, both the fire chief 246 00:18:38,370 --> 00:18:46,170 and the police chief attend, and I think in terms of police chief, that's how your title 247 00:18:46,170 --> 00:18:46,650 goes. 248 00:18:47,590 --> 00:18:52,910 We've got an opportunity to attend one of the last meetings, but I believe prior to that, 249 00:18:52,910 --> 00:18:55,830 the police chief attended all the meetings and the fire chief as well. 250 00:18:55,830 --> 00:19:10,050 And I believe just an answer to Commissioner's question, the actual draft MHP includes for each locality, a list of those participants for each locality that are participated in the overall planning, because it's been a multi-year planning process. 251 00:19:10,510 --> 00:19:15,450 And I believe, Director, you're part of the most recent group of staff also. 252 00:19:15,450 --> 00:19:23,490 Yes, I have helped my eyes on it most recently. Again, I wasn't part of the city or the community earlier in the process. 253 00:19:23,690 --> 00:19:28,870 But I have looked at it. This is a standard process. It's also required under state law. 254 00:19:29,430 --> 00:19:34,770 Brianna will go over some of that for the commission. This is a regional view. 255 00:19:34,810 --> 00:19:44,490 It's not a localized detailed view. So I do think that that's important to keep in perspective as we hear from Brianna for this presentation. 256 00:19:44,490 --> 00:19:46,050 Yeah, very good. Welcome. 257 00:19:46,810 --> 00:19:53,150 Thank you so much. Again, Brianna Jones. I'm an emergency services officer for the NAP Accounting Office of Emergency Services. 258 00:19:53,330 --> 00:19:56,350 I know that's a lot, but we've shortened it by saying OES. 259 00:19:57,110 --> 00:20:03,230 I'm involved in a lot of different things, but hazard mitigation is one of the bigger projects. 260 00:20:03,610 --> 00:20:07,830 Hazard mitigation is really important because it drives a lot of our other plans. 261 00:20:07,830 --> 00:20:12,530 has her mitigation in general, though, is an all-encompassing plan. 262 00:20:13,230 --> 00:20:15,770 So when we look at it, we look at the plan today. 263 00:20:16,070 --> 00:20:17,990 It doesn't get into a lot of the specific. 264 00:20:17,990 --> 00:20:20,490 It talks about mitigation actions. 265 00:20:21,470 --> 00:20:25,790 And it talks about some of the hazards that the county has a hole. 266 00:20:26,010 --> 00:20:27,930 And I know that you had mentioned regional. 267 00:20:28,330 --> 00:20:32,990 It's more of the county where the county has developed some of the hazards that we believe 268 00:20:32,990 --> 00:20:34,250 are the biggest concern. 269 00:20:34,250 --> 00:20:40,390 But then each city kind of had an opportunity to talk about the hazard, because what Calistoga or San 270 00:20:40,390 --> 00:20:44,970 Lina might be Ms. A hazard may not be something that American can and is worried about. 271 00:20:46,170 --> 00:20:51,210 So one of the things that I think is important to know is this plan is very different. 272 00:20:51,750 --> 00:20:59,870 Plans are updated every five years. That's a requirement of FEMA to be updated every five years for grant opportunities. 273 00:20:59,870 --> 00:21:05,830 that's the only basis is that it has to be done every five years, it does not necessarily mean 274 00:21:05,830 --> 00:21:11,310 that if we did not invest in doing it every five years, the plan wouldn't be relevant. 275 00:21:11,690 --> 00:21:16,990 It's just for the funding opportunity. It has to be updated every five years. To do that update, 276 00:21:17,230 --> 00:21:24,770 it does take a lot of planning efforts. It takes a lot of time. And then once that process kind of goes 277 00:21:24,770 --> 00:21:26,630 So we're going to talk about it later in the presentation. 278 00:21:27,450 --> 00:21:30,330 That's when each jurisdiction will get the opportunity. 279 00:21:30,570 --> 00:21:31,910 The county will go first. 280 00:21:32,410 --> 00:21:35,630 I'll ask our Board of Supervisors to adopt the plan 281 00:21:35,630 --> 00:21:38,630 and then each jurisdiction and special districts 282 00:21:38,630 --> 00:21:39,610 will adopt the plan. 283 00:21:39,930 --> 00:21:42,390 So yes, this will have to go be for your city again. 284 00:21:43,510 --> 00:21:47,070 So the reason this plan is different is most counties, 285 00:21:47,210 --> 00:21:50,490 most cities do what is called a local hazard mitigation plan. 286 00:21:50,650 --> 00:21:54,610 So if you see L, H, M, P, that is essentially the same thing 287 00:21:54,610 --> 00:21:56,310 but they're doing at a local level 288 00:21:56,310 --> 00:21:58,470 for whatever that may be county or city. 289 00:21:59,050 --> 00:22:02,370 We decided to do a multi-gerest external hazard mitigation plan 290 00:22:02,370 --> 00:22:04,130 and we did that back in 2020. 291 00:22:05,150 --> 00:22:07,550 The reason this one is different is we've included 292 00:22:07,550 --> 00:22:08,810 a little bit more engagement. 293 00:22:09,250 --> 00:22:11,510 We had more stakeholders and it was more 294 00:22:11,510 --> 00:22:13,610 of an all-in-cup-it-seen planning effort. 295 00:22:14,510 --> 00:22:16,090 And I think that's really important 296 00:22:16,090 --> 00:22:19,510 because part of my job is to go after grant opportunities. 297 00:22:20,490 --> 00:22:21,770 I went after a grant opportunity. 298 00:22:21,930 --> 00:22:23,450 These are very costly plans 299 00:22:23,450 --> 00:22:26,250 because of the analysis that is done. 300 00:22:26,750 --> 00:22:31,950 Some special districts and some jurisdictions do not have the opportunity to have plans, 301 00:22:32,210 --> 00:22:37,910 so therefore they can't go after a fund grant or funding opportunities, because they don't have a current plan, 302 00:22:38,190 --> 00:22:39,650 or sometimes ever a plan. 303 00:22:40,270 --> 00:22:45,050 And that was important for me that we included some of those special districts, so they had that opportunity, 304 00:22:45,630 --> 00:22:47,790 which is why we chose to do a multi-judicial. 305 00:22:49,190 --> 00:22:57,290 In 2005, the city of Napa had also decided to go after their own plan because they needed to do a flood project, which we know now is the Oxbow. 306 00:22:57,890 --> 00:23:02,950 So the city of Napa for since 2005 has never been included on our plan. 307 00:23:03,210 --> 00:23:11,710 This time they are included on our plan, which is beneficial since most of the hazards for our tourism. 308 00:23:12,250 --> 00:23:14,470 Most of the population is within the city of Napa. 309 00:23:14,470 --> 00:23:16,230 that was very important that they were on our plan. 310 00:23:16,230 --> 00:23:20,630 So we have all five jurisdictions and there's a size that shows you everybody that's participating. 311 00:23:21,850 --> 00:23:29,770 The challenge to doing a plan that way though is now everybody is relying on each jurisdiction 312 00:23:29,770 --> 00:23:36,470 and special district to involve themselves in the planning process to review the plan, to 313 00:23:36,470 --> 00:23:38,950 provide comment, to attend their own meetings. 314 00:23:39,450 --> 00:23:41,610 That has held up our plan quite a bit. 315 00:23:41,610 --> 00:23:43,810 I think the benefits outweigh the challenges, 316 00:23:43,890 --> 00:23:46,450 but that is a challenge of a multi-juris-stictional plan 317 00:23:46,450 --> 00:23:47,790 to be quite frank. 318 00:23:54,020 --> 00:23:55,040 I'm sorry. 319 00:23:55,840 --> 00:23:56,280 There you go. 320 00:23:56,900 --> 00:24:01,120 Okay, so some of the goals of a multi-juris-stictional hazard mitigation plan 321 00:24:01,120 --> 00:24:03,240 is to protect people from loss of life, 322 00:24:03,240 --> 00:24:05,020 and drain economic damage from hazards. 323 00:24:05,680 --> 00:24:07,880 That is obviously the biggest priority 324 00:24:07,880 --> 00:24:11,480 in which I said, like I said, it drives a lot of different plans. 325 00:24:11,480 --> 00:24:16,100 I know that it's very popular to discuss evacuation planning. 326 00:24:17,020 --> 00:24:22,580 A goal of hazard, a multi-judicial hazard mitigation plan is to get to that approach, 327 00:24:23,160 --> 00:24:25,600 what are hazard, how do we mitigate those? 328 00:24:26,100 --> 00:24:31,640 Another goal is to protect critical facilities infrastructure property in the continuity of essential services. 329 00:24:32,520 --> 00:24:38,520 Again, each special district, each jurisdiction, had the opportunity to discuss their critical infrastructure. 330 00:24:38,520 --> 00:24:43,100 That's why special districts I believe are so important to hazard mitigation planning. 331 00:24:43,580 --> 00:24:49,680 Because special districts, for example, Napasan, they had never had a plan and now they're part of our hazard mitigation plan. 332 00:24:50,000 --> 00:24:54,820 They're a big special district that is now included and they have a lot of critical infrastructure. 333 00:24:56,280 --> 00:24:57,720 Preserve natural resources. 334 00:24:58,620 --> 00:25:00,480 That's another big part of it. 335 00:25:01,240 --> 00:25:05,520 That's one of the things that is discusses if we have hazards like wildfire. 336 00:25:05,520 --> 00:25:08,000 what natural resources are we taking away from? 337 00:25:08,040 --> 00:25:09,620 How can that be mitigated? 338 00:25:10,060 --> 00:25:11,500 Those discussions happen. 339 00:25:12,240 --> 00:25:13,640 And then promote community resilience 340 00:25:13,640 --> 00:25:15,540 through planning policies, like I said, 341 00:25:15,740 --> 00:25:19,240 a lot of these lead to a lot of other plans, 342 00:25:19,380 --> 00:25:21,600 a lot of procedures, and a lot of policy changes. 343 00:25:22,020 --> 00:25:24,420 But it also leads to, like I said, capital improvements. 344 00:25:25,160 --> 00:25:27,360 When we look at general fund, 345 00:25:27,700 --> 00:25:29,300 when we look at funding opportunities, 346 00:25:29,460 --> 00:25:30,540 when we look at grants, 347 00:25:31,020 --> 00:25:33,220 that's where we want to spend our money 348 00:25:33,220 --> 00:25:38,240 mitigation actions that have plans like this or analysis done to back that up. 349 00:25:45,580 --> 00:25:51,180 So because FEMA requires the plan for grant and funding, we are held to the FEMA standard 350 00:25:51,180 --> 00:25:52,140 for planning efforts. 351 00:25:52,500 --> 00:25:54,420 That's why I put the slide on here. 352 00:25:54,780 --> 00:25:56,500 There's a lot of different steps. 353 00:25:57,440 --> 00:26:05,700 So what the community of City have seen, I think a lot of people here participated in was 354 00:26:05,700 --> 00:26:07,320 that public review period. 355 00:26:07,320 --> 00:26:13,000 That public review is important as I think it is for the public to be part of that plan. 356 00:26:13,140 --> 00:26:17,220 It is also required by FEMA, as well as an admin draft. 357 00:26:17,460 --> 00:26:22,680 So not only did we go into a lot of different planning meetings on jurisdiction special districts, 358 00:26:23,700 --> 00:26:28,860 then we went into analysis, then we went into more planning meetings, then we went into mitigation efforts. 359 00:26:29,180 --> 00:26:36,660 We also went into an admin draft for each special district jurisdiction, then the county draft and then we went to public review. 360 00:26:36,660 --> 00:26:46,340 So we are now at that final public review step just concluded and now we're with CaloES for approval and then hopefully FEMA. 361 00:26:47,730 --> 00:26:48,750 Next slide please. 362 00:26:51,150 --> 00:27:00,670 So a few changes from 2020 to 2026, I know that that's probably hard to read, but we focused on a lot of priority hazards. 363 00:27:01,110 --> 00:27:07,210 So hazard mitigation plan in general does not focus on human caused hazards. 364 00:27:07,810 --> 00:27:12,330 That's something that I think a lot of people want to see because it is a concern, especially 365 00:27:12,330 --> 00:27:13,630 with cyber security. 366 00:27:14,250 --> 00:27:18,790 Those are addressed in other plans, so we try to keep them away from our hazard mitigation 367 00:27:18,790 --> 00:27:24,370 plan, just because it is really hard since it is a public document to include a lot 368 00:27:24,370 --> 00:27:32,570 about that, acts of tear, for example, that belongs in other plans, not necessarily hazard mitigation 369 00:27:32,570 --> 00:27:33,110 plans. 370 00:27:33,110 --> 00:27:39,630 because as much as we try to mitigate those, sometimes those can't be mitigated as much as 371 00:27:39,630 --> 00:27:40,610 you can, natural hazards. 372 00:27:42,850 --> 00:27:48,750 And another big change was the pandemic. So the pandemic was in 373 00:27:48,750 --> 00:27:55,830 there. Ironically, this plan, most of the planning efforts from 2020 were done in 2019. Prior to 374 00:27:55,830 --> 00:28:02,150 the COVID pandemic, but they still identified a pandemic as a hazard. We have now taken that out. 375 00:28:02,150 --> 00:28:09,530 I think a lot of people from 2022-2026 just felt that it wasn't necessary in a hazard mitigation 376 00:28:09,530 --> 00:28:09,990 plan. 377 00:28:10,370 --> 00:28:14,570 We learned a lot from COVID and those are addressed in other plans. 378 00:28:16,530 --> 00:28:23,170 Extreme weather was another big change, so we had extreme weather already in our 2020 plan. 379 00:28:23,330 --> 00:28:28,070 We have now included extreme heat as a separate component, just because there's so much 380 00:28:28,070 --> 00:28:33,090 comes to extreme heat and so therefore we just made a separate component to discuss separately 381 00:28:33,090 --> 00:28:38,590 and mitigation actions to that. And then of course like I said before the enhanced partnerships, 382 00:28:40,450 --> 00:28:45,050 we've now included more special districts and additional jurisdictions. 383 00:28:46,530 --> 00:28:52,210 And then FEMA had some changes. The climate change is the biggest one. We needed to include that 384 00:28:52,210 --> 00:29:03,590 and guidelines about climate change, it is a difficult subject, and there's not as much research on the mitigation actions, but however it was included in this plan, verse the 2020. 385 00:29:05,270 --> 00:29:06,090 Next slide, please. 386 00:29:08,620 --> 00:29:21,520 Okay, so in 2020, nine jurisdictions were involved in the plan was adopted June 9 of 2020, and in 2025 we identified 13 jurisdictions. 387 00:29:21,520 --> 00:29:24,560 So we have more special districts than added the city of Napa. 388 00:29:26,080 --> 00:29:35,520 The two bigger changes is like I said city of Napa, Napa San, and VTA who had a regional approach with other transit authorities are now part of our plan. 389 00:29:35,640 --> 00:29:38,300 So they can go after grant opportunity separately. 390 00:29:38,680 --> 00:29:42,240 And then American Canyon fire district because it is a district. 391 00:29:42,660 --> 00:29:45,540 They were included as part of the city of American Canyon. 392 00:29:45,540 --> 00:29:48,360 but because they are also deemed 393 00:29:48,360 --> 00:29:50,160 a special district now they can go after 394 00:29:50,160 --> 00:29:51,640 their own funding opportunities. 395 00:29:54,440 --> 00:29:55,240 Next slide, please. 396 00:29:56,880 --> 00:29:57,860 Okay, so it's hard to see, 397 00:29:57,980 --> 00:29:59,780 but these are the hazards that were identified. 398 00:29:59,780 --> 00:29:59,940 Bye. 399 00:30:00,000 --> 00:30:15,160 By the steering committee in 2020, like I said, a lot of that, the work and analysis was done in 2019, prior to the LNU lightning or glass fire, because like I said, it was adopted in June 9, I think of 2020. 400 00:30:16,660 --> 00:30:28,620 So, at that time, wildfire was identified as a county-wide hazard, but it was not necessarily at the top of the list, even considering we had the 2017 fires. 401 00:30:28,620 --> 00:30:31,380 people are still really concerned with climate change, 402 00:30:31,380 --> 00:30:33,280 damn failure and drought. 403 00:30:35,060 --> 00:30:38,700 And as you can see, just, I guess, to me a fun little tidbit, 404 00:30:39,120 --> 00:30:43,460 but we had 28 federal disasters since 1953 at that time. 405 00:30:43,700 --> 00:30:46,020 We've now obviously increased that quite a bit. 406 00:30:47,620 --> 00:30:48,380 Next slide, please. 407 00:30:50,140 --> 00:30:50,760 Oh, sorry. 408 00:30:51,940 --> 00:30:53,480 There's some stuff cut off at the bottom, 409 00:30:54,140 --> 00:30:57,700 but 2025, our hazard concerns didn't differ too much, 410 00:30:57,700 --> 00:31:02,160 other than what I've mentioned, climate change is on there as well. 411 00:31:02,580 --> 00:31:07,680 We have more information because even though we discussed it in 2020, there is a little 412 00:31:07,680 --> 00:31:11,140 bit more information and now it is actually a requirement of FEMA. 413 00:31:11,500 --> 00:31:18,280 Extreme heat was identified and wildfire, of course, but we took pandemic out of there. 414 00:31:18,880 --> 00:31:24,640 And each jurisdiction because they had separate planning meetings were able to identify different 415 00:31:24,640 --> 00:31:28,400 as are profiles, concerns, and mitigation efforts based off 416 00:31:28,400 --> 00:31:29,320 with the city felt. 417 00:31:29,780 --> 00:31:31,920 So even though the county has developed some, 418 00:31:32,340 --> 00:31:35,440 not every city has those same concerns, 419 00:31:36,040 --> 00:31:38,740 has the same mitigation efforts or the same profile. 420 00:31:41,560 --> 00:31:44,620 Another thing I just wanted to discuss here is, 421 00:31:44,740 --> 00:31:46,860 we broke it down and kind of talked about 422 00:31:46,860 --> 00:31:49,140 some of the concerns with like wildfire exposure. 423 00:31:50,020 --> 00:31:53,540 17,000 people are in the high and very high severity zones. 424 00:31:53,540 --> 00:31:58,260 I know wildfire is one of our biggest concerns, and that's something that is talked about a lot. 425 00:31:58,540 --> 00:32:01,600 I'm asked to do a lot of presentations on wildfire concern. 426 00:32:02,600 --> 00:32:07,020 I'm also concerned about it, and I think it's very important to discuss, but I just wanted 427 00:32:07,020 --> 00:32:12,480 to highlight that that is, again, why has remediation planning is so important, because 428 00:32:12,480 --> 00:32:18,700 you know, flood exposure based off the 100 year and 500 year FEMA flood zones, 20,000 people 429 00:32:18,700 --> 00:32:19,780 are affected by that. 430 00:32:19,780 --> 00:32:26,180 earthquake exposure. You have, you know, 120,000 people affected if that West Napa fault. 431 00:32:27,180 --> 00:32:30,840 We're to have a concern so that's why even though I think it is something, 432 00:32:31,260 --> 00:32:35,880 it's all kind of a lived experience for us when it comes to wildfire. A lot of us were here in 433 00:32:35,880 --> 00:32:43,240 2017, 2020. I certainly was. I know that it's a cause for concern but that's why hazard mitigation 434 00:32:43,240 --> 00:32:45,080 in planning is all encompassing. 435 00:32:45,240 --> 00:32:47,440 We have some other hazards to be concerned about. 436 00:32:50,400 --> 00:32:53,040 And then, I think I can go to the next slide. 437 00:32:54,100 --> 00:32:56,980 So the next steps from here, like I had mentioned before, 438 00:32:57,100 --> 00:33:00,260 the next step is really just getting that CalloES 439 00:33:00,260 --> 00:33:03,380 in FEMA approval and then going for adoption. 440 00:33:03,920 --> 00:33:06,860 Once I go to the county and I ask my Board of Supervisors 441 00:33:06,860 --> 00:33:09,920 to adopt the plan, that five years starts then. 442 00:33:10,240 --> 00:33:13,560 So when I say, hey, I want that plan to be adopted 443 00:33:13,560 --> 00:33:20,480 and they say it's June 9th 2020. You guys might do it on June 17th. You're still following 444 00:33:20,480 --> 00:33:26,700 June 9th. Is that five year mark? So just so everybody knows it doesn't matter if you say, 445 00:33:26,900 --> 00:33:31,160 hey, we're going to wait three months to take it to our council. You're still following this 446 00:33:31,160 --> 00:33:37,400 when the first jurisdiction adopted. Typically, it's the county. It doesn't necessarily have to be. 447 00:33:37,560 --> 00:33:42,120 So if city of Sanileena says, hey, we're ready to go and we would like to adopt the plan. 448 00:33:42,120 --> 00:33:46,360 just know that everybody's held to that date for a first adoption. 449 00:33:47,760 --> 00:33:49,440 And I think just to take it a step further, 450 00:33:50,200 --> 00:33:54,200 it's not just that we're looking for the FEMA Calloyas approval 451 00:33:54,200 --> 00:33:59,400 and then for obviously individual jurisdictions, special districts in the county's adoption. 452 00:33:59,640 --> 00:34:03,140 We're also looking now to take that further and take these hazards 453 00:34:03,140 --> 00:34:04,960 and then develop our own planning. 454 00:34:04,980 --> 00:34:09,000 Some of the plans that I'm in charge of for the county wide approach 455 00:34:09,000 --> 00:34:11,800 is the emergency operations plan for the county, 456 00:34:12,240 --> 00:34:15,080 the continuity of operations plan for the county, 457 00:34:15,420 --> 00:34:17,860 tactical, interoperable communications plan. 458 00:34:17,880 --> 00:34:20,060 These are a lot of the plans that drive this 459 00:34:20,060 --> 00:34:21,620 based off the hazard we have. 460 00:34:22,060 --> 00:34:24,560 So this plan is really a benchmark and a foundation 461 00:34:24,560 --> 00:34:26,520 for a lot of other planning efforts. 462 00:34:28,120 --> 00:34:30,980 And then last slide is just the Q&A. 463 00:34:31,380 --> 00:34:34,600 I'm available for questions regarding this. 464 00:34:35,120 --> 00:34:36,560 Let's open up for questions. 465 00:34:36,720 --> 00:34:37,400 I'll have a couple of questions. 466 00:34:37,400 --> 00:34:39,380 But first, let me defer to my fellow commissioners 467 00:34:39,380 --> 00:34:41,760 if you have any questions or comments or a director. 468 00:34:42,280 --> 00:34:44,220 Through the chair, just a reminder that we also have 469 00:34:44,220 --> 00:34:47,680 with us Chief Swordson and Chief Thub, 470 00:34:47,760 --> 00:34:51,780 if there are local questions that maybe aren't about the multi- 471 00:34:51,780 --> 00:34:53,940 jurisdictional hazard mitigation plan. 472 00:34:54,080 --> 00:34:56,140 And also, to be perfectly honest, 473 00:34:56,300 --> 00:34:58,440 I didn't get an opportunity to attend every meeting 474 00:34:58,440 --> 00:35:01,040 for every jurisdiction and every special district. 475 00:35:01,060 --> 00:35:02,160 I'm only one person. 476 00:35:02,720 --> 00:35:05,400 So they might have some additional information specific 477 00:35:05,400 --> 00:35:11,260 to the city of St. Alina on how they develop their hazard profiles, how they develop mitigation 478 00:35:11,260 --> 00:35:17,500 actions that take the stuff. And just to clarify the the the the information item is the 479 00:35:17,500 --> 00:35:23,860 multi-hazard mitigation plan not other plans. That's correct. I think that generally though this 480 00:35:23,860 --> 00:35:31,020 can be confusing. So just in case there are members of our staff here who can assist. 481 00:35:31,020 --> 00:35:38,280 All right. Okay. Questions or comments from fellow questioners? Anything? Go ahead. 482 00:35:38,560 --> 00:35:44,640 Commissioner Covell. So I'm just having a little hard time because I was 483 00:35:44,640 --> 00:35:47,660 under the impression where it's not really supposed to have a discussion. 484 00:35:48,400 --> 00:35:52,260 So I wasn't sure. General questions. I think are fine. Okay. We're not 485 00:35:52,260 --> 00:35:57,020 deliberating. We're not saying, you know, saying, yeah, or need to it. I think what 486 00:35:57,020 --> 00:36:01,440 What you were mentioning is we had an opportunity during public comment to 487 00:36:01,440 --> 00:36:05,340 Deliberate on the plan, but yes, I'm happy to take questions regarding the plan 488 00:36:05,340 --> 00:36:11,760 What it drives obviously that that's up to Liza, but how it drives are other plans? 489 00:36:11,760 --> 00:36:13,640 Happy to discuss that 490 00:36:14,160 --> 00:36:18,880 Okay, I bring in her. I think I've sent you a lot of public comments 491 00:36:20,480 --> 00:36:21,040 So 492 00:36:21,040 --> 00:36:26,980 So one of the general questions I have, I have a couple of general questions and I won't 493 00:36:26,980 --> 00:36:29,860 go into the detail that I have already done. 494 00:36:33,520 --> 00:36:38,780 In the, you said, Cal OES and FEMA, I need to prove it. 495 00:36:38,880 --> 00:36:44,260 You also mentioned that the public comments in general, it was open, Naples Countywide, 496 00:36:44,360 --> 00:36:45,840 general public comments. 497 00:36:45,840 --> 00:36:55,960 I assume there's some process to handling all those public comments and how do those comments 498 00:36:57,360 --> 00:37:00,460 then how are they addressed in the plan? 499 00:37:01,260 --> 00:37:02,020 That was question one. 500 00:37:02,200 --> 00:37:08,980 And then who specifically in our jurisdiction, local jurisdiction, reviews the section 501 00:37:08,980 --> 00:37:19,520 on St. Alina specifically and what timing is that, what's the timing of that to provide 502 00:37:19,520 --> 00:37:21,960 comments before it goes for approval? 503 00:37:24,200 --> 00:37:30,620 So, the administrative draft was the time period for the planning committee from City of 504 00:37:30,620 --> 00:37:37,480 St. Alina to provide comment. That draft went out prior to public comment. I don't have 505 00:37:37,480 --> 00:37:40,820 that in front of me, so I'm not sure how many people from the City of Saint 506 00:37:40,820 --> 00:37:43,720 Alina might have provided comment at that time. 507 00:37:45,200 --> 00:37:47,420 Then it went to public comment. 508 00:37:48,300 --> 00:37:53,240 We take those public comments between me and the consultant and we review the comments 509 00:37:53,240 --> 00:37:54,820 and then make changes. 510 00:37:55,440 --> 00:38:02,500 If there's a relevant change to the plan, because obviously, you know, the public can say 511 00:38:02,500 --> 00:38:07,460 whatever they would like, doesn't mean that it's going to require a change to the 512 00:38:08,240 --> 00:38:21,360 So we get a lot of, we do get a lot of those comments and then we get a lot of comments that, you know, specifically to some, like some of the comments that you sent me, some are very specific to evacuation planning. 513 00:38:21,920 --> 00:38:26,800 This is not an evacuation document, so they may, you may not see them represented. 514 00:38:26,800 --> 00:38:32,880 And, however, that would be an opportunity for you guys to look in the city of San 515 00:38:32,880 --> 00:38:33,040 Elena. 516 00:38:33,040 --> 00:38:38,340 If you want to take the hazard of wildfire and the mitigation actions and then develop 517 00:38:38,340 --> 00:38:40,160 another plant specific to it. 518 00:38:40,340 --> 00:38:46,860 Or update if you guys have evacuation plans, I'm not sure if you have a separate evacuation 519 00:38:46,860 --> 00:38:49,280 plan, but they might be able to answer that. 520 00:38:53,840 --> 00:38:53,960 Sorry. 521 00:38:54,220 --> 00:38:55,080 Oh, let's... 522 00:38:56,740 --> 00:38:57,180 Thanks. 523 00:38:57,380 --> 00:38:57,940 Anybody else? 524 00:38:58,040 --> 00:38:59,480 I had a couple of clarifying questions. 525 00:39:00,540 --> 00:39:00,900 I think. 526 00:39:00,980 --> 00:39:01,320 Go ahead. 527 00:39:01,320 --> 00:39:08,720 I believe this is almost a 1,500-page document, so very impressive, and I'm sure there's 528 00:39:08,720 --> 00:39:18,000 amazing great data throughout it, but if you were to point to areas that were more specific 529 00:39:18,000 --> 00:39:22,880 to our jurisdiction, where would we look in this 1,500-page document? 530 00:39:23,260 --> 00:39:31,300 So you want to look at volume 2. Volume 1 is the county. So right now, like I said, it 531 00:39:31,300 --> 00:39:38,020 out for public comment. It's with Kelli West and FEMA right now. But when we publish that document 532 00:39:38,020 --> 00:39:44,460 and it is a big document we do put it online but it is difficult to send people because even 533 00:39:44,460 --> 00:39:50,840 by email I have there's you know IDS stuff it's too big of a file so we can get those so there you 534 00:39:50,840 --> 00:39:56,020 guys can have them right at the city so it's available to the public you guys can print copies 535 00:39:56,020 --> 00:40:00,800 we always say whatever the jurisdiction would like to do and how they would like to address that 536 00:40:00,800 --> 00:40:07,260 public but I just put it online a lot of times I put the executive summary and I typically 537 00:40:07,260 --> 00:40:13,060 don't publish volume two unless a lot of people want me to publish volume two online. 538 00:40:13,520 --> 00:40:18,820 Volume two is specifically the jurisdictions and the special districts that are involved and 539 00:40:18,820 --> 00:40:24,760 it's broken out by that. So the way to look at it is kind of quote unquote an annex to our 540 00:40:24,760 --> 00:40:29,340 bigger plan which is volume one. If you'd like a lot of the information that's going to be 541 00:40:29,340 --> 00:40:33,560 volume one, but it's going to be county-wide, so it's not going to be specific to city 542 00:40:33,560 --> 00:40:35,940 of San Alina, volume two, we'll have that. 543 00:40:36,400 --> 00:40:38,560 Through the chair, I can add some more specificity. 544 00:40:38,760 --> 00:40:44,480 I believe it's under volume two, which is jurisdictional annexes, section four is the city 545 00:40:44,480 --> 00:40:45,460 of San Alina, annex. 546 00:40:47,600 --> 00:40:48,560 Thank you. 547 00:40:49,300 --> 00:40:50,460 Thank you. 548 00:40:50,460 --> 00:40:52,060 And other questions of questions of question? 549 00:40:52,680 --> 00:40:54,760 $859 is the page number. 550 00:40:55,220 --> 00:40:55,780 All right. 551 00:40:56,560 --> 00:40:57,680 Other questions? 552 00:40:58,120 --> 00:40:58,840 Some questions are for a deck. 553 00:40:59,600 --> 00:41:01,760 If not, I had a couple of questions. 554 00:41:02,240 --> 00:41:02,680 More technical. 555 00:41:04,260 --> 00:41:07,960 First of all, I get to clear that, as you point out, this multi-terristic 556 00:41:07,960 --> 00:41:11,640 No-house mitigation plan does not address emergency evacuation. 557 00:41:11,860 --> 00:41:14,220 Does not address the county's EOP. 558 00:41:14,860 --> 00:41:17,940 Does not address local emergency operating plans, correct? 559 00:41:17,940 --> 00:41:25,180 No, I mean, it's identified that those are brought in is kind of like a reference but no, it does not address those. 560 00:41:25,600 --> 00:41:38,200 So adoption of this plan does not affect the discretion or the ability of local jurisdictions to adopt, modify or continue to update their emergency operation plans as well as the county's the OP correct. 561 00:41:38,200 --> 00:41:45,680 correct. The county does have an EOP that was adopted in 2022 by our Board of Supervisors. 562 00:41:46,460 --> 00:41:52,320 So we do consistent updates probably every two to three years, but that doesn't affect any 563 00:41:52,320 --> 00:41:57,440 specific jurisdiction. Although we do ask jurisdictions if they would like to be involved, 564 00:41:57,660 --> 00:42:03,500 and then the plan looks pretty similar. There's an annex for a specific city if they would like. 565 00:42:03,500 --> 00:42:10,480 Some jurisdictions choose to participate, some choose to not participate, which I only assume that just means they do their own plan. 566 00:42:11,020 --> 00:42:20,360 I had a question on participating jurisdictions, a system of reference, I mentioned special districts, and I appreciate that this iteration is expanded into special districts. 567 00:42:20,940 --> 00:42:26,360 was the Napa Open Space District solicited to participate, and if so, why did they not choose 568 00:42:26,360 --> 00:42:26,860 to participate? 569 00:42:27,460 --> 00:42:33,700 They are a very large land manager up our way in the Myocama as well as over on the eastern 570 00:42:33,700 --> 00:42:40,660 side and up north of St. Lena between St. Lena and Calstoga, were they solicited to participate? 571 00:42:42,300 --> 00:42:49,260 We, I can't specifically speak to that, it was probably two years ago now that we got 572 00:42:49,260 --> 00:42:53,540 list from our Board of Supervisors and said, hey, we're reaching out to special districts. 573 00:42:53,680 --> 00:42:59,060 Please let us know the special districts you think would be worth reaching out to that 574 00:42:59,060 --> 00:43:02,980 aren't part of the current plan, because obviously we already knew some that would be interested. 575 00:43:04,180 --> 00:43:10,180 And at that time, that's when we reached out, we had NAPA San and VTA that decided to. 576 00:43:10,300 --> 00:43:15,560 Some choose not to, just because it is a big lift to be part of those, and we're pretty honest 577 00:43:15,560 --> 00:43:18,480 at the beginning is, we're taking on the cost, 578 00:43:18,640 --> 00:43:21,560 we have a grant, the grant sometimes requires a match, 579 00:43:22,000 --> 00:43:24,600 we utilize staff time as our match, 580 00:43:24,780 --> 00:43:27,460 so we're not asking the jurisdictions to provide anything, 581 00:43:27,660 --> 00:43:29,220 but we're pretty honest about the fact 582 00:43:29,220 --> 00:43:34,740 that it does require a lot of hours of personnel 583 00:43:35,420 --> 00:43:38,180 to participate, and so that might have been a reason 584 00:43:38,180 --> 00:43:41,640 why open space didn't, I can't speak to whether or not 585 00:43:41,640 --> 00:43:43,180 we actually reach out to them, 586 00:43:43,180 --> 00:43:47,880 or whether or not they chose why they chose not to. 587 00:43:48,240 --> 00:43:50,340 Well, as an emergency planner for the county, 588 00:43:50,500 --> 00:43:55,460 wouldn't it be useful even after you adopt the Mobile Jurisdictional HMP 589 00:43:55,460 --> 00:43:59,120 to reach out to the open space district to have them take a look 590 00:43:59,120 --> 00:44:01,920 and incorporate into their own emergency procedures 591 00:44:01,920 --> 00:44:03,660 for their own lands that they manage? 592 00:44:05,600 --> 00:44:07,500 Okay. Thank you. Those were all my questions. 593 00:44:07,640 --> 00:44:10,800 I think that's a very good presentation and very well done. 594 00:44:10,800 --> 00:44:13,840 and I reviewed the Saint-Lean Apportion 595 00:44:13,840 --> 00:44:15,280 as well as most of the plan. 596 00:44:15,860 --> 00:44:16,960 Other questions, your comments? 597 00:44:17,440 --> 00:44:17,940 Commissioner Covell. 598 00:44:18,620 --> 00:44:19,420 Thank you. 599 00:44:19,740 --> 00:44:23,960 Yeah, I also would like to say it's a very comprehensive document. 600 00:44:24,440 --> 00:44:27,500 I did read all 1500 pages of it. 601 00:44:27,680 --> 00:44:31,900 But, and I know we're not going to go into the Saint-Lean 602 00:44:31,900 --> 00:44:33,340 chapter particularly. 603 00:44:34,300 --> 00:44:40,140 But I want to understand, it sounds like in this presentation 604 00:44:40,140 --> 00:44:49,900 that this document helps people jurisdictions get grant money and funding for particular pieces 605 00:44:49,900 --> 00:44:59,280 that they need a help on correct. And so in the local annex chapter chapter chapter on St. 606 00:44:59,280 --> 00:44:59,960 Queen of... 607 00:45:00,880 --> 00:45:22,520 If the chapter is written and analyzed in a way that shows need for further analysis or study or something, this is the opportunity for our town to address these larger projects and find grant money or funding. 608 00:45:22,520 --> 00:45:27,800 correct? Like if it's painting a pretty picture and everything's great, then it's not really 609 00:45:27,800 --> 00:45:31,680 serving the purpose of getting grant money, correct? 610 00:45:31,860 --> 00:45:37,940 Correct. And so I like to look at it in different buckets. Hazard mitigation based off 611 00:45:37,940 --> 00:45:43,520 analysis, we've decided that these are the hazards. And the analysis just could come from 612 00:45:43,520 --> 00:45:51,220 like outside sources from GIS from mapping, from FEMA's flood maps. Calfires hazards 613 00:45:51,220 --> 00:45:56,100 these are outside resources that help drive some that hazard profile. 614 00:45:57,040 --> 00:46:01,280 For example, I could say City of Sainlina, 615 00:46:01,900 --> 00:46:05,880 most of your city is in high and very high fire severity zones. 616 00:46:06,580 --> 00:46:08,480 And you could, as the city say, you know what? 617 00:46:08,480 --> 00:46:09,900 I think we've worked on that enough. 618 00:46:10,120 --> 00:46:11,440 It's not our biggest hazard. 619 00:46:12,020 --> 00:46:13,680 I'm not saying that that's what happened. 620 00:46:13,860 --> 00:46:16,280 I'm just saying, for example, you could decide that. 621 00:46:16,380 --> 00:46:20,020 So the buckets are we're saying based off data. 622 00:46:20,020 --> 00:46:25,300 here is your hazard. Then you're saying this is a hazard, but I'm more concerned about this 623 00:46:25,300 --> 00:46:32,320 hazard. And then the mitigation actions are there. And as a city, those are in a planning 624 00:46:32,320 --> 00:46:36,920 committee, those are developed. A lot of times, a mitigation action could say the mitigation 625 00:46:36,920 --> 00:46:42,860 action is for the public to do this. Well, you guys don't get to control the public so much. 626 00:46:43,340 --> 00:46:48,120 So, or that mitigation action, but it might be the community outreach component related to that. 627 00:46:48,120 --> 00:46:53,020 Or it could say, yeah, you guys would really benefit from having more roads, for example. 628 00:46:53,340 --> 00:46:58,160 That is a very big cost, whether or not that's a grant opportunity or a general fund opportunity. 629 00:46:58,660 --> 00:47:00,560 That's for the city of Saint Helena to decide. 630 00:47:01,240 --> 00:47:06,120 But those are kind of the buckets that I look at hazard mitigation in is here's a lot of data. 631 00:47:06,380 --> 00:47:10,400 Here's your hazards, but you have the opportunity to say these are our concerns. 632 00:47:10,980 --> 00:47:14,840 Even though you're presenting the data, a lot of times people agree with it, but they could say, 633 00:47:14,840 --> 00:47:18,920 know what. I think we've really worked on wildfire. I'm really concerned about flooding 634 00:47:18,920 --> 00:47:23,680 in the city of San Alina and then a lot of your mitigation actions are developed off 635 00:47:23,680 --> 00:47:29,900 of your concerns. And I might just point out that San Alina has been very aggressive and active 636 00:47:29,900 --> 00:47:37,000 in seeking federal grants and state grants for various hazard mitigation. In fact, as part of 637 00:47:37,000 --> 00:47:44,240 my role on fire safety counsel, the city was very much involved in seeking funding from the federal 638 00:47:44,240 --> 00:47:49,720 government from FEMA. Unfortunately, as we all know, with the federal funding in Washington, 639 00:47:49,720 --> 00:47:55,060 a lot of the FEMA grants available for whether it's wildfire or other housing mitigation 640 00:47:55,060 --> 00:47:59,280 and planning have gone away or have been reduced drastically. So, we'll stand point of 641 00:47:59,280 --> 00:48:05,500 seeking grants. The the opportunity for federal funding is a lot less than it was. But, 642 00:48:05,500 --> 00:48:13,840 Wayne Alina, what was it chief, maybe six or seven years ago, applied for a full FEMA grant 643 00:48:13,840 --> 00:48:15,920 that was available to the city. 644 00:48:16,080 --> 00:48:21,780 So the city has not been shy about applying for additional grants five years ago. 645 00:48:22,620 --> 00:48:23,380 Thank you. 646 00:48:23,840 --> 00:48:30,680 So I'd like to ask some clarifying questions just about whose responsibility it is to apply for the grants 647 00:48:30,680 --> 00:48:39,920 and your role and is your priority county more county-wide initiatives? Do you lead grant 648 00:48:39,920 --> 00:48:44,860 applications for the jurisdictions or is that solely there's responsibility for the 649 00:48:44,860 --> 00:48:49,000 jurisdictions? How do you prioritize what you do? 650 00:48:50,100 --> 00:48:55,960 So when it comes to grants at the county I've become a bit of a subject matter expert on state 651 00:48:55,960 --> 00:49:02,800 federal funding, but it is up to the jurisdictions. So the City of San Helena said this is a mitigation 652 00:49:02,800 --> 00:49:09,060 action. For example, that is, we decided we can't general fund, but we would like to see state 653 00:49:09,060 --> 00:49:14,600 or federal funding and you found a grant opportunity. That would be up to the jurisdiction to apply. 654 00:49:14,780 --> 00:49:21,980 However, I'm not not available to help. It's just that a lot of times state and federal funding 655 00:49:22,640 --> 00:49:30,200 applications require a lot of local knowledge that I may not have, which is why it's not 656 00:49:30,200 --> 00:49:35,640 necessarily, I'm a bucket of like, here you go, just apply for this. This is what we like. 657 00:49:36,200 --> 00:49:41,160 It would be really difficult for me to do that, because I don't have that local knowledge. And 658 00:49:41,160 --> 00:49:44,860 I don't have the local perspective and a lot of state and federal grants, because they're 659 00:49:44,860 --> 00:49:51,060 so competitive. Now they're looking for kind of the picture of how this impacts and will 660 00:49:51,060 --> 00:49:56,360 helpful to your community and it's hard for me to tell a story on a local level because I'm 661 00:49:56,360 --> 00:50:01,340 always looking at that county perspective. So I hope that answers your question. There are 662 00:50:01,340 --> 00:50:07,320 quite a few grants. I manage the home land security grant and the emergency management performance 663 00:50:07,320 --> 00:50:13,300 grant which those are grants that are intended to help out the entire county home land security 664 00:50:13,300 --> 00:50:18,400 is based on terrorism. So when I'm looking for stuff, I'm looking at county resources like 665 00:50:18,400 --> 00:50:25,780 equipment for rescue task force operations for SWAT operations that will eventually help 666 00:50:25,780 --> 00:50:31,360 city of Santa Elena if any of those things, you know, would unfortunately happen in 667 00:50:31,360 --> 00:50:31,740 your city. 668 00:50:32,140 --> 00:50:38,960 And of course there's a state grant under opt or proposition four that's been subject 669 00:50:38,960 --> 00:50:43,720 to lots of pushing and tugging and pulling because various parties in Sacramento have 670 00:50:43,720 --> 00:50:49,720 want to get the lion's share of that funding because it includes not only wildfire but also 671 00:50:49,720 --> 00:50:55,640 parks and recreation very competitive I know because I followed the budget deliberations 672 00:50:55,640 --> 00:51:01,280 in Sacramento for Proposition 4 and it's not easy so even though that money is available 673 00:51:01,280 --> 00:51:06,400 it's highly competitive for various jurisdictions that are seeking it. 674 00:51:06,680 --> 00:51:12,780 Is there a clearinghouse for all the grant opportunities as a resource for each of the 675 00:51:12,780 --> 00:51:13,720 there's Dixins? 676 00:51:14,560 --> 00:51:21,260 Yes, and no, there's like grants.gov is a great place to find a lot of grant opportunities. 677 00:51:22,520 --> 00:51:27,000 Caloes and FEMA have websites, a lot of times you have to look at it, there's some 678 00:51:27,000 --> 00:51:32,380 FEMA grants, for example, that only state the states can apply for and then a lot of times 679 00:51:32,380 --> 00:51:38,240 the state will apply for it and then they'll become a subrecipient to FEMA and then you 680 00:51:38,240 --> 00:51:40,840 will become a subrecipient to the state. 681 00:51:40,840 --> 00:51:46,420 And so, sometimes you just have to look at what we call a no-photo notice of opportunity. 682 00:51:49,160 --> 00:51:56,440 And I think a lot of times they're pushed out between different disciplines. 683 00:51:57,140 --> 00:52:03,180 So I think law fire might get a lot of grant opportunities, fire may hear about some fuel mitigation, 684 00:52:03,740 --> 00:52:05,820 or I may not necessarily hear about those. 685 00:52:05,940 --> 00:52:08,760 So sometimes it's dependent on the discipline you're looking at. 686 00:52:08,760 --> 00:52:14,440 If you're looking for fuel mitigation, that's something that may come through your fire chief more. 687 00:52:15,840 --> 00:52:17,720 So let me ask our chiefs. 688 00:52:17,720 --> 00:52:21,560 Are you aware of these grant opportunities that come through? 689 00:52:30,360 --> 00:52:31,920 I just realized the microphone wasn't on. 690 00:52:32,620 --> 00:52:35,160 But yeah, you guys can sit there. 691 00:52:35,220 --> 00:52:36,040 Yes, we are. 692 00:52:36,040 --> 00:52:38,940 They come across our email through the city. 693 00:52:39,200 --> 00:52:41,640 We're always looking for these opportunities. 694 00:52:41,940 --> 00:52:43,800 We have a BWC grant right now, 695 00:52:43,800 --> 00:52:48,980 which is body camera, grant through the, I believe it's the prison, California prison authority. 696 00:52:50,280 --> 00:52:53,120 We just got, we just wrapped up one for an officer, the paid part of the salary. 697 00:52:53,600 --> 00:52:56,060 So we're always, always, always looking for grant opportunities. 698 00:52:56,320 --> 00:53:02,600 And they usually come through our POAO, which is Andrew Bradley, and he just kind of disseminates 699 00:53:02,600 --> 00:53:03,120 them out. 700 00:53:03,400 --> 00:53:06,960 And we see if it's something that we can qualify for, and if it is, we attempt to write 701 00:53:06,960 --> 00:53:08,040 it and get it. 702 00:53:10,310 --> 00:53:12,090 Yeah, that's all, all true. 703 00:53:12,090 --> 00:53:18,610 We have that, the big grant for the 2.7 million to clean up after the glass fire has been five years. 704 00:53:19,350 --> 00:53:24,950 And I had biologists, two biologists just come double-checking a couple of months ago. 705 00:53:25,350 --> 00:53:27,110 And so we're getting closer and closer. 706 00:53:27,430 --> 00:53:29,190 And then nothing will be said for six, eight months. 707 00:53:29,530 --> 00:53:31,730 And then I'll also look back and send out an archaeologist. 708 00:53:32,410 --> 00:53:34,370 So it's a very difficult grant to acquire. 709 00:53:34,990 --> 00:53:35,930 But it's still alive. 710 00:53:36,390 --> 00:53:40,530 They thought that it would have been since the last administration came in. 711 00:53:40,530 --> 00:53:44,310 thought it would have been axed, but that's not true. It's still still life. 712 00:53:45,490 --> 00:53:48,730 Thank you. Other questions or comments on this information item? 713 00:53:52,040 --> 00:53:57,080 Looking at the whole plan and then our town. Obviously, I know most of the concerns must 714 00:53:57,080 --> 00:54:02,000 be that we're in a great little valley where it grows a line in between hills and it only a 715 00:54:02,000 --> 00:54:08,200 couple of ways in and out, whether it's fire, flood, earthquake. I'm pretty sure a lot of 716 00:54:08,200 --> 00:54:17,200 community want a way out easy, but we live in a kind of like area that I guess what I'm trying 717 00:54:17,200 --> 00:54:21,440 to say is there might be a lot of input, but there might only be a certain amount of ways 718 00:54:21,440 --> 00:54:29,380 to handle these how to refer for our town, right? It's kind of been an on-running. I mean, forever 719 00:54:29,380 --> 00:54:34,240 there's only been a certain way in and out and being able to get away from these as safe 720 00:54:34,240 --> 00:54:35,180 as possible. 721 00:54:36,600 --> 00:54:39,340 Have we done any improvements? 722 00:54:39,800 --> 00:54:42,020 Because I assume if there is a disaster, 723 00:54:45,060 --> 00:54:45,440 we can't 724 00:54:45,440 --> 00:54:50,080 widen our rows more to get in and out in a timely fashion. 725 00:54:51,880 --> 00:54:53,800 Any improvements going to these plans? 726 00:54:54,360 --> 00:54:59,320 Is there anything coming up that you guys can see as a light? 727 00:54:59,320 --> 00:55:05,960 I, that's by interest kind of knowing maybe what new or stuff's coming in that might help us avoid 728 00:55:07,120 --> 00:55:12,720 for our community these, as many hardships or disaster efforts. 729 00:55:13,220 --> 00:55:14,640 Let me start off. 730 00:55:15,040 --> 00:55:17,720 So, early warning is the best. 731 00:55:17,820 --> 00:55:21,640 I mean, widening the roads, you know, Hector, that's really tough. 732 00:55:21,840 --> 00:55:23,400 You either go this way or you go that way. 733 00:55:23,840 --> 00:55:26,000 And it's, it is very dynamic. 734 00:55:26,120 --> 00:55:28,580 A lot of people say, well, where, where should I go if there's a fire? 735 00:55:28,580 --> 00:55:29,740 Well, where is the fire? 736 00:55:30,100 --> 00:55:33,200 You can get 270 degrees around this valley. 737 00:55:33,680 --> 00:55:36,040 Only the south end didn't have fire in the glass fire. 738 00:55:36,420 --> 00:55:38,720 It spotted over, burned the whole thing. 739 00:55:40,060 --> 00:55:43,980 So early warning, being prepared, being able to go out. 740 00:55:44,020 --> 00:55:46,940 If you head south, like every time with vineyards on both sides, 741 00:55:47,180 --> 00:55:47,960 you know, you used to be plowed. 742 00:55:47,980 --> 00:55:49,520 When you and I were in high school in San Lina, 743 00:55:50,020 --> 00:55:51,400 they were all tilled. 744 00:55:51,540 --> 00:55:52,360 But now there's grass. 745 00:55:52,580 --> 00:55:55,960 So there's a little bit more that can happen in some areas. 746 00:55:55,960 --> 00:56:05,780 it's hit and miss but we will let you know which way is the safest evacuation so on a fire 747 00:56:05,780 --> 00:56:11,360 if I was the incident commander I do not but a lot of people think that fire is in charge 748 00:56:11,360 --> 00:56:16,720 of the vacuations they're not that's police law enforcement is in charge but they take our 749 00:56:16,720 --> 00:56:21,680 recommendation so if we say the fire is here and in three hours it's going to be here I think you 750 00:56:21,680 --> 00:56:24,780 to give this as a immediate recommendation, 751 00:56:25,180 --> 00:56:27,020 and then this will be a warning. 752 00:56:27,800 --> 00:56:28,960 And so that's how it works. 753 00:56:29,240 --> 00:56:31,300 And I'll tell you, every fire, the deputies, 754 00:56:32,060 --> 00:56:35,640 the police, cities, have always been there right next to me 755 00:56:36,960 --> 00:56:38,720 for trying to take action. 756 00:56:40,140 --> 00:56:40,980 So, I happen. 757 00:56:41,020 --> 00:56:43,820 Anything to add, Chief Tharp? 758 00:56:44,100 --> 00:56:45,720 No, I would say that's correct. 759 00:56:46,860 --> 00:56:49,020 And people don't realize we spend meetings, 760 00:56:49,020 --> 00:56:53,020 these meetings and Santa Rosa that we during the glass fire that we 761 00:56:53,020 --> 00:56:56,840 rat every day discussing ways in and out of the valley where the fire was 762 00:56:56,840 --> 00:56:59,900 at what we need to be evacuated. There's a lot of effort that goes in 763 00:56:59,900 --> 00:57:02,760 that there's people don't even realize this happening behind the scenes. 764 00:57:03,040 --> 00:57:08,260 And I might point out that just recently you gave an update to the city council in 765 00:57:08,260 --> 00:57:13,540 terms of a emergency preparation in the city for for wildfire and I 766 00:57:13,540 --> 00:57:17,540 actor you might want to take a look at that city council presentation that 767 00:57:17,540 --> 00:57:22,480 that was received as an update and I understand we're going to have some drills, aren't we? 768 00:57:22,720 --> 00:57:22,980 Oh yeah. 769 00:57:23,180 --> 00:57:23,240 Yes. 770 00:57:23,240 --> 00:57:27,340 This year, drills are so important in terms of being prepared for evacuation. 771 00:57:27,880 --> 00:57:31,400 Through the chair, I just want to add one additional item. 772 00:57:32,000 --> 00:57:34,900 It doesn't stop at our city boundaries. 773 00:57:35,320 --> 00:57:41,080 So when there's an emergency or an urgent matter, they're not just talking to each other, 774 00:57:41,200 --> 00:57:46,380 but they're talking to their other respective partners that are in other jurisdictions as well. 775 00:57:46,380 --> 00:57:49,860 So it's not, it's not just here in St. Helena. 776 00:57:49,960 --> 00:57:50,980 Yep, county wide emergency. 777 00:57:50,980 --> 00:57:55,700 I wanted to add that I do get a lot of text for closures, 778 00:57:55,900 --> 00:57:57,000 damage, going around stuff. 779 00:57:57,360 --> 00:57:59,720 And I'm in Fairfield all the time at the main office. 780 00:58:00,380 --> 00:58:03,020 And so, and I even let my wife know she didn't read it. 781 00:58:03,420 --> 00:58:04,920 So that early detection is work. 782 00:58:05,120 --> 00:58:06,940 Oh, I just want to ask for everything. 783 00:58:07,340 --> 00:58:09,620 So I am very happy with that. 784 00:58:09,900 --> 00:58:14,620 And I'll just speak to this prior to my work with OES. 785 00:58:14,620 --> 00:58:21,820 I worked for AMR, which is the 19-contracted 911 system here prior to that was pioneers and I was with them as well. 786 00:58:22,120 --> 00:58:25,260 So I've been on every disaster since the earthquakes in 2014. 787 00:58:26,120 --> 00:58:35,140 And I was there in 2017 and I was there in 2020 and I evacuated St. Alina Hospital twice in 2020, which was really fun. 788 00:58:36,240 --> 00:58:44,600 But a lot now in this, the job that I'm in now, a lot has changed from 2017 to 2020 when it's come to 789 00:58:44,600 --> 00:58:49,960 Early detection it's come when it's come to alert and warning a lot has changed 790 00:58:49,960 --> 00:58:55,480 I know that's not the intention of this meeting, but that is something that at any point 791 00:58:55,480 --> 00:58:58,400 I think you guys can discuss with law and fire about the changes and 792 00:58:59,220 --> 00:59:06,000 Honestly, even at the county, I'm happy to provide information on that but there have been a lot of changes from 2017 and 2020 and 793 00:59:06,000 --> 00:59:10,300 Unfortunately, it is less than slurrent not that that's the way that we want to learn it, but 794 00:59:11,020 --> 00:59:12,820 We'd have taken that into account 795 00:59:12,820 --> 00:59:19,740 I just want to say that I can think to kind of also build off of what Hector Commissioner 796 00:59:19,740 --> 00:59:20,760 Hector. 797 00:59:20,780 --> 00:59:21,340 Sorry. 798 00:59:21,540 --> 00:59:31,360 Lopez was saying, I recently, like, I submitted this, too, as Napaccounty General Plan has 799 00:59:31,360 --> 00:59:40,200 affairs and peers report in their safety element, and it is dated back to 2018, and the study 800 00:59:40,200 --> 00:59:46,280 is done using measurements that are very different than this recent one that was just done in Sonoma 801 00:59:46,280 --> 00:59:53,400 County for Sonoma County counties, fair, and peers, evacuation modeling. And it's kind 802 00:59:53,400 --> 00:59:59,900 of addressing the same things. It's not addressing where like, you know, we have limited space to make 803 01:00:00,000 --> 01:00:06,860 Our roads wider, but it was a study that was done to show where the bottlenecks and the choke points were, 804 01:00:07,000 --> 01:00:13,540 were so they could be proactively mitigated before, so that in an event they could address 805 01:00:13,540 --> 01:00:22,920 those things now in a way that is not going to, it's not, it's going to help during 806 01:00:22,920 --> 01:00:41,240 large evacuations. And so one of my comments, at least that I had put in was that it would be great if we had funding from NAP for NAP Accounting to do a similar report that is based off that kind of style of report and analysis and using the metrics that they use instead of the one that we used. 807 01:00:42,380 --> 01:00:48,220 The other thing that I will say is in reviewing this doc and I hope everybody does review it. 808 01:00:48,600 --> 01:00:52,420 I think some of the things that are, you know, and this is about public health and safety. 809 01:00:53,000 --> 01:01:10,460 So, I think, and what I want to say is that I think some of the stuff that is saying that our town is doing what is our mitigation strategy is apparently 810 01:01:10,460 --> 01:01:18,220 Apparently, based off of the general plan chapters that the previous director has told us 811 01:01:18,220 --> 01:01:23,420 that we cannot use anymore, because there was subjective, there is a meeting in the reference 812 01:01:23,420 --> 01:01:28,100 where she said that the growth management chapter of the general plan is no longer. 813 01:01:28,680 --> 01:01:36,860 We can use that, and this strategy, mitigation strategy, says the growth management plan 814 01:01:36,860 --> 01:01:40,000 in this general plan is how we're safe. 815 01:01:40,920 --> 01:01:43,860 So I think also some of the new California laws 816 01:01:43,860 --> 01:01:48,080 that are coming out are increasing the numbers 817 01:01:49,720 --> 01:01:52,720 that is beyond what our general plan says. 818 01:01:52,720 --> 01:01:55,320 Our general plan says nine units a year. 819 01:01:56,080 --> 01:01:58,140 That's not what's happening anymore. 820 01:01:58,900 --> 01:02:00,360 So I think some of this doc 821 01:02:00,360 --> 01:02:02,540 might have been written a little while ago 822 01:02:02,540 --> 01:02:06,200 or something where it just hasn't gotten caught up 823 01:02:06,200 --> 01:02:10,880 some of the things that have been changing, and so I really wanted to just point that out 824 01:02:10,880 --> 01:02:16,760 for everybody in case they want to look at it in more depth because it's a significant 825 01:02:16,760 --> 01:02:28,980 health public health and safety. I mean it's more safety, life safety, and so yeah, that's 826 01:02:28,980 --> 01:02:35,740 kind of my big comment is that if we are able to get funding or grants that can 827 01:02:36,920 --> 01:02:40,580 help this town particularly because there's a lot of people 828 01:02:40,580 --> 01:02:44,220 funneling through this town during an emergency. Let's just say 829 01:02:44,220 --> 01:02:49,320 Calistoga and going and if they're they're you know they're funneling 830 01:02:49,320 --> 01:02:55,800 through our our roads which in and I pointed out in as a comment our main 831 01:02:55,800 --> 01:03:01,840 street is the highway which is different than many of the other local jurisdictions 832 01:03:01,840 --> 01:03:19,620 where the city is kind of off to the side, and, you know, our street is our main collector street for our town, as well as funneling people from different areas in winning North Northern cities. 833 01:03:20,460 --> 01:03:29,620 population. So I just hope as a town, we put this out in front of everyone more thoroughly 834 01:03:29,620 --> 01:03:37,760 and take the time to address it because this is the opportunity and it seems like if it 835 01:03:37,760 --> 01:03:43,220 can bring us funding or grants or anything like that to help us, I think it's worthwhile to kind 836 01:03:43,220 --> 01:03:49,600 of really dive into that. So I appreciate hold on. I appreciate your position or 837 01:03:49,600 --> 01:03:55,200 opinion on the St. Alina as well as the multi-hazard jurisdictional assumptions I disagree 838 01:03:55,200 --> 01:04:02,280 with you if they are inaccurate or not useful or credible. And in fact of course this plan 839 01:04:02,280 --> 01:04:07,480 has nothing to do with emergency evacuation planning. It references hazard mitigation and emergency 840 01:04:07,480 --> 01:04:15,740 evacuation planning is in a separate plan, separate approach. So this is not the plan to address 841 01:04:15,740 --> 01:04:21,940 emergency evacuation. I just want to clarify that. And again, you and I may disagree with 842 01:04:21,940 --> 01:04:26,540 our interpretation of what this graph plan does. I think this is quite a credible plan, 843 01:04:27,100 --> 01:04:33,600 based on useful data. Obviously emergency evacuation plans get updated. This MHP will not 844 01:04:33,600 --> 01:04:40,380 be updated for five years. That doesn't mean the EOPs aren't updated for every change in 845 01:04:40,380 --> 01:04:43,320 data or transportation planning? 846 01:04:44,100 --> 01:04:50,760 And through the chair, I think what I'll just add here is that I do think that Commissioner 847 01:04:50,760 --> 01:04:59,540 Covalu bring up some valid ideas for funding purposes and that I think as a team here 848 01:04:59,540 --> 01:05:04,880 at the city, we're actively looking, we heard from our chiefs here, they're actively looking 849 01:05:04,880 --> 01:05:10,360 for grants to constantly update what we can and if something does come forward where 850 01:05:10,360 --> 01:05:13,460 we can locally look at that, we would do so, 851 01:05:13,660 --> 01:05:16,480 and I think that that's a desire that we have locally. 852 01:05:17,780 --> 01:05:22,400 Again, this is, I don't think that this plan restricts us 853 01:05:22,400 --> 01:05:23,980 from seeking grants. 854 01:05:25,160 --> 01:05:28,480 It complements our ability to look for grants, 855 01:05:28,540 --> 01:05:31,020 but I'm gonna defer real quick to Brianna 856 01:05:31,020 --> 01:05:33,060 just to supplement what I'm saying. 857 01:05:34,320 --> 01:05:36,380 For grant opportunities, absolutely. 858 01:05:37,120 --> 01:05:39,800 It does supplement any grant opportunities you're looking for 859 01:05:39,800 --> 01:05:42,640 because it just shows that there is a research, 860 01:05:44,280 --> 01:05:47,320 and there's backing to whatever funding you're looking for. 861 01:05:47,480 --> 01:05:50,260 Obviously, I'll be addressed with what that funding is for, 862 01:05:50,540 --> 01:05:52,060 is in the scope of the projects. 863 01:05:52,680 --> 01:05:54,460 So, if you're looking for, 864 01:05:54,460 --> 01:05:57,740 and I think when you're talking about evacuation planning, 865 01:05:58,160 --> 01:06:00,240 one of the things that is a big concern 866 01:06:00,240 --> 01:06:03,120 for a lot of people is ingress and ingress. 867 01:06:03,980 --> 01:06:07,020 Obviously, the answer is more, right? 868 01:06:07,020 --> 01:06:12,760 that's just, but it's not realistic. It's more in every, it's not just the city of 869 01:06:12,760 --> 01:06:19,040 Sanalena, it's in every jurisdiction at least in that county, but most places, more roads, 870 01:06:19,820 --> 01:06:27,080 that, unfortunately, that's just not realistic for a lot of, financial reasons, a lot of, 871 01:06:27,080 --> 01:06:31,800 you know, state, sequel reasons, that type of stuff, and that takes traffic engineers and 872 01:06:31,800 --> 01:06:37,900 everything to develop that, but yes, the answer is definitely more, but that's where the 873 01:06:37,900 --> 01:06:41,900 scopes you want to start looking at the projects you're looking for, the scope of the 874 01:06:41,900 --> 01:06:46,800 project and then how you back up, whatever that scope may be, the hazard mitigation is just 875 01:06:46,800 --> 01:06:47,820 one tool. 876 01:06:48,180 --> 01:06:52,840 Well, let me just be sure, when you say more and more, it depends upon the risk evaluation. 877 01:06:53,460 --> 01:06:57,740 There's not necessarily an or is there the need for a grant if you have an identified 878 01:06:57,740 --> 01:06:59,920 the need for it for a particular purpose, correct? 879 01:06:59,920 --> 01:07:04,940 And typically there's not, I don't know of any grant opportunities that cover more roads. 880 01:07:06,660 --> 01:07:10,800 So, that's honestly just, you know, a comment about, like, yes. 881 01:07:11,040 --> 01:07:18,560 I think a lot of people agree that there are some areas, especially in NAP accounts, especially in this valley, where it would be beneficial to have more routes. 882 01:07:18,720 --> 01:07:26,160 But it's not realistic, just because of one, the funding, and two, we don't know, like you said, the risk that it would present. 883 01:07:26,160 --> 01:07:29,620 But again, the multi-hazard mitigation plan does not deal with 884 01:07:29,620 --> 01:07:33,720 ingress or egress needs for various jurisdictions or the county correct? 885 01:07:33,720 --> 01:07:36,520 It doesn't deal with the evacuation planning on it. 886 01:07:36,520 --> 01:07:41,080 It may address something that might be a mitigation effort. 887 01:07:42,900 --> 01:07:44,720 Or additional routes. 888 01:07:45,440 --> 01:07:49,380 Obviously, that might be a county-wide, or it could be individual cities, 889 01:07:49,820 --> 01:07:49,980 because the... 890 01:07:49,980 --> 01:07:52,340 And that depends on an individual assessment, correct? 891 01:07:52,700 --> 01:07:53,100 Correct. 892 01:07:53,340 --> 01:07:55,120 And I think the assessment you're talking about, 893 01:07:55,120 --> 01:07:56,900 I don't know about out at a county level, 894 01:07:56,900 --> 01:07:59,080 but the city of Sanoma did do a plan 895 01:07:59,080 --> 01:08:01,080 and it does discuss choke points. 896 01:08:03,540 --> 01:08:06,700 At the risk of signing myself up for more presentations, 897 01:08:07,020 --> 01:08:08,780 we actually just recently did one 898 01:08:08,780 --> 01:08:10,840 in the city of American Canyon 899 01:08:10,840 --> 01:08:14,800 because that was a concern for their Watson Ranch area. 900 01:08:16,120 --> 01:08:19,700 And we have some tools that we utilize 901 01:08:19,700 --> 01:08:21,760 that already discuss choke points. 902 01:08:22,420 --> 01:08:23,980 And your fire and police chief know 903 01:08:23,980 --> 01:08:26,960 about the tools of Genesis, they have access to it. 904 01:08:27,040 --> 01:08:30,160 And most of the time, if you talk to local fire 905 01:08:30,160 --> 01:08:33,000 and law, they're aware of the choke points. 906 01:08:33,400 --> 01:08:35,080 One of the things that these plans 907 01:08:35,080 --> 01:08:37,820 don't address is the human element. 908 01:08:38,860 --> 01:08:41,980 So it doesn't matter how much money we would like to spend 909 01:08:41,980 --> 01:08:44,200 on a plan, the human element is always 910 01:08:44,200 --> 01:08:46,160 the thing that is the most crucial. 911 01:08:46,760 --> 01:08:48,680 And we don't know what people will do. 912 01:08:49,380 --> 01:08:50,800 There's orders and warnings. 913 01:08:51,600 --> 01:08:53,560 And a lot of times people just won't 914 01:08:53,560 --> 01:08:58,720 listen to the morning or order, a lot of times they'll evacuate when they're not in an evacuation 915 01:08:59,300 --> 01:09:05,680 zone. Now that's adding more in. There's sometimes people that decide to go a different way 916 01:09:05,680 --> 01:09:10,880 than law enforcement tells them to go. There's always a human element that we can never address 917 01:09:10,880 --> 01:09:16,480 in a plan. But there's a lot of awareness on the choke points. And I think if you would talk to 918 01:09:16,480 --> 01:09:20,840 law and fire, they're aware of those for the city of San Alina, just like in the city of 919 01:09:20,840 --> 01:09:26,800 American Canyon we address that we have awareness of those choke points and we do have some 920 01:09:27,400 --> 01:09:33,100 I guess that being tools that show that point just a point of clarification through the chair 921 01:09:33,880 --> 01:09:41,400 Ingress egress we're in this context we're talking about new roads that people access so just point of clarification 922 01:09:41,400 --> 01:09:49,600 We don't have to discuss it at all just making that clarification for that's fine any other comments or questions before I mean 923 01:09:49,600 --> 01:09:55,720 it. Just to go off of that one is a lot of people kind of with talking like, well, every day 924 01:09:55,720 --> 01:09:59,980 in the rush hour, the choke point. There's choke points that are not really in our jurisdiction, 925 01:10:00,380 --> 01:10:05,020 right? They're kind of a little bit further down at the road, but it kind of impacts coming back up. 926 01:10:05,840 --> 01:10:14,080 So if it's not really in, let's say, chiefs, the chiefs here, jurisdictions to kind of identify those 927 01:10:14,080 --> 01:10:17,500 choke points. That's where I thought this multi-jurist 928 01:10:17,500 --> 01:10:23,200 dictionary kind of approach to it would address things like choke points 929 01:10:23,200 --> 01:10:27,120 down the road that could affect St. Alina residents in an issue, you 930 01:10:27,120 --> 01:10:32,640 know, in an evacuation. Or let's just say for mitigation measures 931 01:10:32,640 --> 01:10:39,200 to address potential. Well, in life safety issues, there's a positive 932 01:10:39,200 --> 01:10:42,120 and a negative to a human element. If you're aware of a choke 933 01:10:42,120 --> 01:10:45,000 point as a law enforcement officer, what are you going to do? 934 01:10:45,100 --> 01:10:49,200 You're going to send officers there to say, hey, I'm going to create this instead of using 935 01:10:49,200 --> 01:10:49,860 stop lights. 936 01:10:50,020 --> 01:10:55,160 I'm going to now use officers to send traffic through or there's things like contraflow 937 01:10:55,160 --> 01:10:55,760 for example. 938 01:10:56,000 --> 01:10:59,880 That's saying everybody that's going north, we're now going to take the south bound because 939 01:10:59,880 --> 01:11:05,120 we need everybody to go north from 29 instead of south or vice versa. 940 01:11:05,460 --> 01:11:10,380 So there's a positive and a negative that some of the planning documents, not that they're 941 01:11:10,380 --> 01:11:16,740 important but that don't address the human element of what people are going to do and then the 942 01:11:16,740 --> 01:11:22,020 element of what the law enforcement officers might do because I'm sure the chief is aware that 943 01:11:22,020 --> 01:11:30,300 there are some choke points in St. Alina that may that may be affected by other choke points within 944 01:11:30,300 --> 01:11:35,900 the county and that's when he would look to his sheriff's office or city of Calestoga counterparts 945 01:11:35,900 --> 01:11:39,980 to say, hey, this is where we need to send additional officers, but I'll have him speak to that. 946 01:11:40,380 --> 01:11:44,320 But you're not in the MHE addressing choke points or emergency evacuation at all. 947 01:11:44,440 --> 01:11:48,180 You're just identifying hazards and it's up to the local jurisdictions through their emergency 948 01:11:48,660 --> 01:11:55,240 planning to do so. And in fact, in terms of coordination, the countywide EOP provides for coordination 949 01:11:55,240 --> 01:12:00,240 among all the jurisdictions for ingress and egress in terms of evacuation routes. Correct? 950 01:12:00,240 --> 01:12:05,060 That's correct. And it's the sheriff's office is obviously outside of any of the jurisdictions. 951 01:12:05,060 --> 01:12:08,700 they're going to handle down incorporating areas, which obviously, 952 01:12:08,880 --> 01:12:10,860 seen a Lena has some unincorporated areas. 953 01:12:11,120 --> 01:12:16,300 I'm just going to, through the chair, I'm going to, I'm going to be a little less technical 954 01:12:16,300 --> 01:12:20,340 right now, but I'll defer to Chief Tharp. 955 01:12:20,720 --> 01:12:29,240 You know, in these are dynamic circumstances and situations when they occur, a plan is helpful 956 01:12:29,240 --> 01:12:35,040 when it's helpful, but at the end of the day, they're going to be making decisions 957 01:12:35,040 --> 01:12:41,900 and coordinating across our boundaries to make sure that the public is getting from point 958 01:12:41,900 --> 01:12:46,760 aid to point M or Z as efficiently and effectively as possible. 959 01:12:46,980 --> 01:12:51,540 That being said, I'm just going to hand it over to Chief Tharp and Chief Sornson, when 960 01:12:51,540 --> 01:12:57,480 there's an incident, you know, simplifying it, how do you operate? 961 01:12:59,340 --> 01:13:12,000 So we would, every, every fire is different, like I said before, you know, and so we would collaborate and it's going to be on the back of the tailgate somewhere on the fire line and 962 01:13:13,100 --> 01:13:18,500 Tharp will be with me and we will weigh all the options and what's the best, the best route. 963 01:13:18,820 --> 01:13:27,400 You know, we do have a big wide open space here, not like Calestoga is at the beginning of and everything v's out farther and farther and every mile you get, it gets wider. 964 01:13:27,900 --> 01:13:34,980 So, if you get into the open space just south of town, it is even in town is pretty 965 01:13:36,120 --> 01:13:38,620 defensible space and safety zones. 966 01:13:38,880 --> 01:13:42,020 I mean, my wife, we live in England, okay. 967 01:13:42,460 --> 01:13:46,760 And so my wife's bags are packed already, they're already in the trunk, okay? 968 01:13:47,100 --> 01:13:47,540 We're ready. 969 01:13:47,720 --> 01:13:48,880 The car is pointed out the door. 970 01:13:48,980 --> 01:13:53,700 She's just got to get the dog wringo in the car and her phone and forget about it. 971 01:13:54,040 --> 01:13:57,380 But in the middle time, you need to get on with your life. 972 01:13:57,380 --> 01:14:05,060 And people worry about it every minute of the day about the fire they have their watch duty on and they see the fire 973 01:14:05,060 --> 01:14:10,720 They see the one over in Rumsie. It's 390 acres and they're just just having a real hard time about it 974 01:14:10,720 --> 01:14:18,440 But you just need to be ready. It's going to be fluid. The Genesis will give you the path for the safest way out 975 01:14:20,020 --> 01:14:26,940 And I'll just ask Chief Tharp, you know, also you're in put how you coordinate its dynamic it's in the moment 976 01:14:26,940 --> 01:14:27,800 It's in the moment. 977 01:14:28,240 --> 01:14:31,600 We actually embed somebody most of the time in the county's EOC. 978 01:14:33,160 --> 01:14:34,660 It's a staff member from here. 979 01:14:35,700 --> 01:14:39,360 We have everybody's phone number that I have looked at Edelman's phone number that you 980 01:14:39,360 --> 01:14:40,080 should handle patrol. 981 01:14:40,260 --> 01:14:41,340 I'm not sure who's doing here right now. 982 01:14:41,980 --> 01:14:42,740 But it's dynamic. 983 01:14:43,000 --> 01:14:45,620 It would be amputing instantly if there's issues. 984 01:14:45,980 --> 01:14:49,920 And of course when the state gets ramped up, CHP has an almost an unlimited resource. 985 01:14:50,340 --> 01:14:54,140 If it comes to traffic control, of course it takes a couple minutes but it could happen very 986 01:14:54,140 --> 01:14:54,540 quickly. 987 01:14:55,240 --> 01:14:56,820 Director, I'd like to wrap this up. 988 01:14:56,820 --> 01:14:59,800 because this is informational and I think we need to move on here. 989 01:15:00,000 --> 01:15:09,480 That's through the chair and the Planning Commission. Again, I appreciate everybody being here for this informational item and it's helpful for us all. 990 01:15:10,000 --> 01:15:19,420 And as you guys know, he mentioned Genesis, that's the note your own program and that is something that's mentioned in the hazard mitigation plan. 991 01:15:19,420 --> 01:15:21,860 and is actually a requirement from Calo, 992 01:15:21,980 --> 01:15:24,420 we ask now to have zone-based evacuations. 993 01:15:25,160 --> 01:15:27,480 So that was a tool that we'll be mentioned in there. 994 01:15:27,880 --> 01:15:29,040 Thank you very much for your presentation. 995 01:15:29,040 --> 01:15:33,240 Very good and keep up the good work in terms of the planning. 996 01:15:33,600 --> 01:15:34,740 Thank you, this is the presentation. 997 01:15:34,940 --> 01:15:36,700 Presentation will also be at the Town Hall meeting. 998 01:15:36,960 --> 01:15:38,440 We will have Lieutenant Edelman. 999 01:15:38,760 --> 01:15:41,780 And if we get an opportunity, I'll talk to the chief, 1000 01:15:41,980 --> 01:15:43,620 but we'll show you guys a little bit of Genesis. 1001 01:15:44,460 --> 01:15:46,480 Thank you. Let's move on then. 1002 01:15:46,480 --> 01:15:51,680 before we go. I'm just going to think both chiefs for being here in Brianna again. I don't 1003 01:15:51,680 --> 01:15:58,260 know if you want to do a plaque. I did think her again. Oh yeah, Lisa asked me, John, who would 1004 01:15:58,260 --> 01:16:03,980 be the best to present the has everything I said there's only one and that's going to be Brianna 1005 01:16:03,980 --> 01:16:08,980 Jones right there and you did a fantastic job and yes, we have the town hall meeting which is 1006 01:16:08,980 --> 01:16:12,540 going to be filmed as soon as you're going to miss it. It's going to be next Thursday the 30th. 1007 01:16:12,540 --> 01:16:13,840 You're going to have calfire there. 1008 01:16:14,060 --> 01:16:15,040 Brianna's coming back. 1009 01:16:15,160 --> 01:16:17,120 I'll be there just in. 1010 01:16:17,860 --> 01:16:19,340 It's going to be, there's going to be six presenters. 1011 01:16:20,080 --> 01:16:22,700 Insurance companies say, how is your insurance? 1012 01:16:23,560 --> 01:16:25,580 Is what is it based on? 1013 01:16:25,580 --> 01:16:27,540 David Capone, who's been on the fart apartment 1014 01:16:27,540 --> 01:16:29,120 our fart apartment for 20 years. 1015 01:16:29,580 --> 01:16:33,500 He owns a portion of an insurance company in town. 1016 01:16:34,440 --> 01:16:37,260 And then the city employees will have EOC training 1017 01:16:37,260 --> 01:16:38,740 this Thursday, the 23rd. 1018 01:16:39,120 --> 01:16:41,080 So we're ramping up. 1019 01:16:41,080 --> 01:16:50,100 Thank you. Thank you. Thank you so much. Thank you. Okay, that was a good good discussion. Thank you all. 1020 01:16:51,260 --> 01:16:58,620 We're on to, I think, the next item, which is our adoption of our work plan, am I correct, director? 1021 01:16:59,320 --> 01:17:08,620 Yes, thank you. So, Lisa McIlligan, Director of Community Development, and just make sure she has everything. 1022 01:17:08,620 --> 01:17:14,060 I'm going to assume all of our commissioners have gone through the plan because we've had it in front of us. 1023 01:17:14,060 --> 01:17:15,280 Yes, so I'll go ahead. 1024 01:17:15,280 --> 01:17:15,440 Yes, so I'll go ahead. 1025 01:17:15,560 --> 01:17:17,440 Your presentation or maybe your summary. 1026 01:17:18,360 --> 01:17:19,920 So we can take my brief presentation. 1027 01:17:20,620 --> 01:17:21,540 Thank you. 1028 01:17:22,040 --> 01:17:24,900 So this item was before the commission that it's last meeting. 1029 01:17:25,620 --> 01:17:30,060 And there was a request and desire to look a little closer at it. 1030 01:17:30,420 --> 01:17:36,080 Since that meeting, we have made a few amendments to it where we've sectioned off 1031 01:17:36,080 --> 01:17:45,840 actual private projects that would likely be becoming before the commission, so you'll see that as a difference as well as our policy projects. 1032 01:17:46,280 --> 01:17:53,960 And we added a few additional items to the policy projects. One is potentially, again, all of these are potential. 1033 01:17:54,220 --> 01:18:00,600 They're not commitments and they're subject to approval of our city manager as well as a city council. 1034 01:18:00,600 --> 01:18:28,760 But we added inclusionary housing and looking at our ordinance based on some conversations we've had with a member group that we have here in the city, our housing assembly group as well as looking at potentially cultural art on private properties, I would like to remove the word overlay from that and just look at our ordinance. 1035 01:18:28,760 --> 01:18:33,760 with respects to artwork on private properties, 1036 01:18:34,020 --> 01:18:36,060 so art and sculptures on private properties. 1037 01:18:36,800 --> 01:18:41,200 And with that, happy to hear from the commission. 1038 01:18:41,460 --> 01:18:43,420 I think this has been a great exercise 1039 01:18:43,420 --> 01:18:45,740 where we're looking at bylaws, 1040 01:18:46,560 --> 01:18:49,120 and we're looking at our code sections 1041 01:18:49,820 --> 01:18:51,420 for the planning commission. 1042 01:18:51,740 --> 01:18:54,040 And we will be taking this before the city council 1043 01:18:54,040 --> 01:18:55,800 for their ultimate approval. 1044 01:18:55,800 --> 01:19:25,040 So, good. I've got a couple of questions and additions. One of the things you and I have discussed is basically I would like to add on the, and this is, by the way, as a available, I think your section on inclusionary zone or inclusionary housing are all as available, because you've got a lot of workload that you do just to get the, the normal wash out. So, I understand that all these items are subject to availability and capacity, but I would like to add at the end of that list. 1045 01:19:25,800 --> 01:19:34,900 on going review of downtown specific plan elements and standards in the zoning code to promote efficient quality responsive economic development. 1046 01:19:36,040 --> 01:19:48,420 And my reason there is I know we have kind of suspended the detailed downtown specific plan work out of I think concern over funding as well as availability of time. 1047 01:19:48,420 --> 01:19:54,280 But on an asavailable basis, I think we as part of the planning commission need to constantly 1048 01:19:55,220 --> 01:20:00,440 asavailable review the elements of the zoning code that affect our downtown businesses 1049 01:20:00,440 --> 01:20:02,320 in an economic development sense. 1050 01:20:02,680 --> 01:20:08,480 So I'm not wedded any particular phrasing, but I thought I would recommend to my fellow 1051 01:20:08,480 --> 01:20:10,000 commissioners that we had that. 1052 01:20:10,500 --> 01:20:15,600 Secondly, I'd like to add something that I discussed briefly at our last discussion, which 1053 01:20:15,600 --> 01:20:19,240 is ongoing review of potential amendments to the zoning code 1054 01:20:19,240 --> 01:20:22,540 to comply with standards for objective versus subjective 1055 01:20:22,540 --> 01:20:24,540 regulations and design standards. 1056 01:20:25,180 --> 01:20:29,620 This, I think, came out of Commissioner Covelle's initial thoughts 1057 01:20:29,620 --> 01:20:31,860 when we first talked about the zoning code update, 1058 01:20:32,080 --> 01:20:34,120 but also I think it's a broader issue. 1059 01:20:34,300 --> 01:20:38,980 It's the issue of we've gone as far as being sure 1060 01:20:38,980 --> 01:20:43,620 that our housing-related regulations are objective 1061 01:20:43,620 --> 01:20:49,840 and compliance with state law, but we haven't gone and looked at all of our current zoning 1062 01:20:49,840 --> 01:20:53,680 code provisions in terms of whether they are objective or subjective. 1063 01:20:54,180 --> 01:21:00,440 We have just achieved a very great, with a great staff work, a rewrite, a redo of the ADU 1064 01:21:00,440 --> 01:21:04,080 standards, which make them more predictable and objective. 1065 01:21:04,780 --> 01:21:09,040 I'd like to just add that Alan and Azavailable basis that we would be doing it on going 1066 01:21:09,040 --> 01:21:14,120 review of the standards in the zoning code for objective or subjective regulations. 1067 01:21:15,020 --> 01:21:18,940 I would like to, this might be controversial, but I feel very strongly about it. 1068 01:21:19,240 --> 01:21:22,580 I think we did a delete the accessory cultural art overlay. 1069 01:21:23,240 --> 01:21:31,520 In my opinion, the zoning, the planning commission has no role in regulating private arts. 1070 01:21:32,120 --> 01:21:36,700 I don't believe that the planning commission has a lead on public art. 1071 01:21:36,700 --> 01:21:43,320 I believe Parks and Recreation has a lead on public art, so I would not recommend that we 1072 01:21:43,320 --> 01:21:51,880 approve this as part of our planning commission work plan, because I don't support it. 1073 01:21:51,980 --> 01:21:55,800 I think, basically, getting into, first of all, I don't have a lot of resources. 1074 01:21:56,300 --> 01:22:00,420 Second of all, public art is being something being dealt with by the Parks and Recreation Commission. 1075 01:22:00,420 --> 01:22:07,100 And third of all, I don't know of any authority that this city has to regulate private art 1076 01:22:07,100 --> 01:22:14,380 on private property that has no violation of any existing setback or any public safety standards. 1077 01:22:15,020 --> 01:22:18,340 So I would ask if that accessory cultural art overlay be deleted. 1078 01:22:18,860 --> 01:22:24,460 My personal interpretation of the code right now is that if I wanted to put a piece of art 1079 01:22:24,460 --> 01:22:27,660 in my backyard, I would not need to go to the city for approval. 1080 01:22:27,660 --> 01:22:35,020 So, particularly if it doesn't violate any particular public health or safety requirement. 1081 01:22:35,460 --> 01:22:39,160 So those are my recommendations, but also open it up for other commissioners in terms 1082 01:22:39,160 --> 01:22:44,140 of any recommendations and thoughts and director if you would like to address my recommendations. 1083 01:22:44,760 --> 01:22:46,680 Obviously, you'll have a chance to do that too. 1084 01:22:48,820 --> 01:22:48,860 Sure. 1085 01:22:49,380 --> 01:22:52,680 So I've taken note of what you would like to add. 1086 01:22:52,680 --> 01:23:00,120 These are items that our department has placed here on our work plan to potentially look at. 1087 01:23:00,180 --> 01:23:04,820 And we will discuss them with our city manager and ultimately with the city council. 1088 01:23:04,880 --> 01:23:06,000 Let me correct something. 1089 01:23:06,420 --> 01:23:10,420 You're asking the planning commission to adopt this as a work plan, not as a staff work plan. 1090 01:23:10,500 --> 01:23:13,540 I have no objection to the staff providing a work plan. 1091 01:23:13,860 --> 01:23:17,980 But if you're asking for the planning commission to endorse a work plan, then it's not something 1092 01:23:17,980 --> 01:23:23,680 simply take back to the city manager, either the planning commission approves this as the planning 1093 01:23:23,680 --> 01:23:28,580 commission's work plan or we don't. So, Chair, I'm not going to, I'm not going to argue with you this 1094 01:23:28,580 --> 01:23:35,080 evening, but I will love to hear from the rest of the information. Thank you. I do have some questions 1095 01:23:35,080 --> 01:23:46,460 and comments. Under the projects that might come before us that you've listed, Gray, I have a 1096 01:23:46,460 --> 01:23:49,360 question about whether you think the cliff family project 1097 01:23:49,360 --> 01:23:52,480 who came with kind of a pre-application would be coming 1098 01:23:52,480 --> 01:23:55,640 in the next year and also the spring vineyards. 1099 01:23:55,780 --> 01:23:58,300 So those are the two other projects 1100 01:23:58,800 --> 01:24:04,720 that I thought might, parts of it might come before us 1101 01:24:04,720 --> 01:24:08,060 in this planning year and wondered what your thoughts were on that. 1102 01:24:08,340 --> 01:24:11,720 Do you want me to ask you all of my make-all of my comments 1103 01:24:11,720 --> 01:24:13,020 or should we go one by one? 1104 01:24:13,160 --> 01:24:15,400 Yeah, I think one by one works for me. 1105 01:24:15,400 --> 01:24:18,880 I think that's fine if acceptable through the chair. 1106 01:24:19,220 --> 01:24:21,560 What I'll say about spring vineyard, the housing project, 1107 01:24:21,760 --> 01:24:24,940 is that's not a project that's 1108 01:24:24,940 --> 01:24:26,800 slated to go before the planning commission. 1109 01:24:28,240 --> 01:24:31,180 So I wouldn't automatically be putting 1110 01:24:31,180 --> 01:24:33,780 that on the work plan. 1111 01:24:35,660 --> 01:24:38,600 I'll defer to Ms. O'Neill about Cliff. 1112 01:24:38,820 --> 01:24:43,080 I have not heard any communications from the applicant 1113 01:24:43,080 --> 01:24:45,000 for the Cliff Free Development Project 1114 01:24:45,000 --> 01:24:48,720 since we had the initial pre-submittal application. 1115 01:24:49,540 --> 01:24:51,680 So I wouldn't anticipate that it would come 1116 01:24:51,680 --> 01:24:54,760 in this fiscal year, but we're hopeful 1117 01:24:54,760 --> 01:24:56,580 that it will be coming back soon. 1118 01:24:56,940 --> 01:24:57,220 Okay. 1119 01:24:58,280 --> 01:25:00,160 And I'm just just that you consider that 1120 01:25:00,160 --> 01:25:02,640 in terms of bandwidth because I think, 1121 01:25:02,640 --> 01:25:04,600 you know, this fiscal year, 1122 01:25:04,980 --> 01:25:07,000 we're talking about the one that just started, right? 1123 01:25:07,000 --> 01:25:08,400 So we're talking about a 12 month period. 1124 01:25:08,480 --> 01:25:11,660 So it's feasible that it could come back to us 1125 01:25:11,660 --> 01:25:12,580 in 12 months. 1126 01:25:12,880 --> 01:25:14,420 Yes. So I'll touch on that real quick. 1127 01:25:14,420 --> 01:25:22,340 This plan is based on what we know and what we're operating under as of this point in time. 1128 01:25:22,940 --> 01:25:28,920 So how we actually move forward before the commission is dependent on many factors, including 1129 01:25:28,920 --> 01:25:32,400 was an application submitted that we didn't know about. 1130 01:25:32,420 --> 01:25:33,860 Was it deemed complete? 1131 01:25:34,060 --> 01:25:35,340 Will it be coming forward? 1132 01:25:35,420 --> 01:25:36,700 This is what we know. 1133 01:25:36,700 --> 01:25:40,320 We don't need to amend the plan again. 1134 01:25:40,480 --> 01:25:44,520 It's just a snapshot today of what we're hoping 1135 01:25:44,520 --> 01:25:49,380 to bring forward based on our work plan in the department 1136 01:25:49,380 --> 01:25:53,780 and what we know is likely to come before the planning commission. 1137 01:25:54,780 --> 01:25:56,920 Okay. A couple of other things. 1138 01:25:59,520 --> 01:26:01,600 So I would love to add. 1139 01:26:02,020 --> 01:26:04,100 And I don't think this is going to be a big ask, 1140 01:26:04,100 --> 01:26:16,180 but under departmental projects that we revisit and make some updates to the planning 1141 01:26:16,180 --> 01:26:21,920 department website pages to make them more public-friendly. 1142 01:26:23,960 --> 01:26:26,600 And we talked about a dashboard, but there are ways. 1143 01:26:26,600 --> 01:26:36,020 And, and to try to help with staff time, I mean, we could even do an ad hoc committee or something. 1144 01:26:36,180 --> 01:26:45,520 I mean, there are people who understand how to make pages like that far more user-friendly. 1145 01:26:47,120 --> 01:26:51,480 Obviously, it does also take some data entry as you're going through projects. 1146 01:26:51,480 --> 01:27:07,780 I understand that requires staff time, but I think there are people who could help reduce the staff time and implementing that and it wouldn't take much to make a big improvement for public access to information. 1147 01:27:09,060 --> 01:27:15,840 Yeah, so that's a great thing to bring up. That is on our department's work plan. It's not on the planning commission's work plan. 1148 01:27:15,840 --> 01:27:25,000 So it wouldn't be, yeah, but I will say that myself, Natalie and Jackie, we're all beginning 1149 01:27:25,000 --> 01:27:31,120 that process, we're incorporating it in, making little changes, you'll hear a little more 1150 01:27:31,120 --> 01:27:34,500 for me about some of those little changes later on in today's meeting. 1151 01:27:35,260 --> 01:27:40,680 But that is something that they desire to do greatly, and so that will be periodic. 1152 01:27:40,960 --> 01:27:43,620 It wouldn't be in our planning commission work plan though, great. 1153 01:27:43,620 --> 01:27:50,240 If you'd like focus group of small focus group, I'm willing to volunteer. 1154 01:27:53,880 --> 01:28:00,680 Then I, my question you put attend the league of California City's planning commissioners 1155 01:28:00,680 --> 01:28:06,840 as a Academy, I assume that you're budgeting for one or more commissioners to be able to go. 1156 01:28:07,520 --> 01:28:08,740 Yes, we budget for that. 1157 01:28:09,560 --> 01:28:12,020 Okay, how many commissioners are you budgeted for? 1158 01:28:12,020 --> 01:28:19,480 It's fully budgeted and if there's a need to make edits we can, so it's highly desirable 1159 01:28:19,480 --> 01:28:22,380 that the planning commissioners do attend those. 1160 01:28:22,860 --> 01:28:23,940 I find them very valuable. 1161 01:28:25,960 --> 01:28:35,960 And then what about an ongoing update, and maybe this is bringing in legal counsel periodically 1162 01:28:35,960 --> 01:28:49,840 in terms of some of the laws that get past that impact what we do here. So, I'd love to see some, you know, 1163 01:28:50,080 --> 01:28:58,800 reporting on that or presentations on that as they come up like not necessarily, you know, they can be consolidated, 1164 01:28:58,800 --> 01:29:04,440 whether that's quarterly, whether that's you know, however that is represented, but I think 1165 01:29:04,440 --> 01:29:10,100 it would be very helpful to this commission to understand you know, what new laws are being 1166 01:29:10,100 --> 01:29:17,220 passed, particularly you know, in California, that effect zoning code and housing and all 1167 01:29:17,220 --> 01:29:18,560 the things that come before us. 1168 01:29:19,040 --> 01:29:22,660 Yes, so we actually already have that on here under the Department's Schedule. 1169 01:29:22,840 --> 01:29:23,920 It's the last bullet. 1170 01:29:23,920 --> 01:29:28,860 This is California Environmental Quality Act and State Legislative Updates as necessary. 1171 01:29:29,380 --> 01:29:29,840 Yeah, got it. 1172 01:29:30,960 --> 01:29:31,580 Great, great. 1173 01:29:32,320 --> 01:29:35,540 And my last comment, I'm so sorry, but then that's it. 1174 01:29:36,500 --> 01:29:47,880 Is Chair Warner, what you may not be aware of was that I did have some conversation with staff about whether the department, 1175 01:29:50,660 --> 01:29:58,800 can weather code applies to sculptures and art on private property. 1176 01:30:00,000 --> 01:30:10,440 The feedback I got, which is maybe why I think director Miguel probably put it on here, was that it could be considered an accessory building. 1177 01:30:11,080 --> 01:30:21,920 And there's code that you have to follow for accessory building. So I would say, if we determine that it falls into the category of accessory building. 1178 01:30:21,920 --> 01:30:33,180 We just structure, sorry, it says building in the code, but, okay, structure. Then we do then I would like to see this reviewed. 1179 01:30:33,780 --> 01:30:40,040 If we determine that it does not fall in the category of an accessory structure, then there's no need. 1180 01:30:40,780 --> 01:30:45,160 So let me respond to that, because I may be with a little hasty in responding director. 1181 01:30:45,160 --> 01:30:50,680 But these are not recommended amendments. 1182 01:30:50,860 --> 01:30:57,000 These are amendments to potentially be considered by staff to recommend to the planning commission. 1183 01:30:57,160 --> 01:30:58,200 And go to the process. 1184 01:30:58,560 --> 01:31:02,260 And I have a, as I think Ms. Verdeck knows, 1185 01:31:02,260 --> 01:31:08,240 I have a particular position on private art that I would probably, 1186 01:31:08,780 --> 01:31:14,100 and in the long run basically say it doesn't pass the left test for being an accessory building, 1187 01:31:14,600 --> 01:31:18,660 particularly if it's simply somebody's decision that they don't like the art. 1188 01:31:19,260 --> 01:31:24,060 That said, if what you want to do is these are not recommended amendments. 1189 01:31:24,260 --> 01:31:28,440 These are simply amendments that staff may forward to the planning commission for consideration. 1190 01:31:28,780 --> 01:31:30,600 We may decide them up or down. 1191 01:31:30,880 --> 01:31:37,140 As long as we're making that clear to the city council, I know Public Art has certainly been a controversial issue in front of the city council. 1192 01:31:37,140 --> 01:31:42,640 And others, I also know because I participated in the Parks and Recreation Commission's 1193 01:31:42,640 --> 01:31:42,980 consideration. 1194 01:31:43,120 --> 01:31:50,620 The public art is that Parks and Recreation Commission and the city are engaged in trying 1195 01:31:50,620 --> 01:31:58,320 to update what was a very probably inadequate public art policy and process that was available. 1196 01:31:58,820 --> 01:32:03,060 That said, I'm fine at keeping this mentioned as long as we make clear to the City Council 1197 01:32:03,060 --> 01:32:06,300 that the Planning Commission is not necessarily recommending any of these amendments 1198 01:32:06,300 --> 01:32:11,840 at this time. No, these are simply items that we will take through a process. 1199 01:32:11,940 --> 01:32:16,280 I'm fine with that. And that the commission will be asked to consider all of the information 1200 01:32:16,280 --> 01:32:21,080 in the record at that time. I'm fine with that. That's, and I think that's very true of all these 1201 01:32:21,080 --> 01:32:27,820 items because I think they have an opportunity for us to, as a planning commission, consider what 1202 01:32:27,820 --> 01:32:34,280 staff brings to us. And we may amend the degree, disagree, not a doc. I'm fine with that. So let's 1203 01:32:34,280 --> 01:32:37,920 to keep it in. Thank you. Thanks for that interpretation. 1204 01:32:39,940 --> 01:32:42,640 Other commissioners, comments, suggestions. 1205 01:32:43,500 --> 01:32:48,840 I was just thinking would it be good to add something where we review the hazard 1206 01:32:49,620 --> 01:32:51,760 this volume to. 1207 01:32:52,260 --> 01:32:53,900 It's not within our jurisdiction. 1208 01:32:55,660 --> 01:32:56,680 Can I finish my sentence? 1209 01:33:01,910 --> 01:33:09,370 If you want, I think it's an important topic and I don't know if it needs to be a bullet point or whatever, 1210 01:33:09,750 --> 01:33:19,950 but or a work plan, but you know, I think it's the city's due diligence now to review the chapter that was written for saying, 1211 01:33:20,030 --> 01:33:26,750 you know, before it gets adopted and kind of really go through it. So I would like to add that to the work plan. 1212 01:33:26,750 --> 01:33:31,410 If possible, if not, I'm just kind of... 1213 01:33:31,410 --> 01:33:41,250 Is that the purview of the council and certainly Commission or Covel can weigh in with the council, you know, even in advance after reviewing it? 1214 01:33:41,630 --> 01:33:45,490 I've already submitted my comments, so it's just more of a public... 1215 01:33:45,490 --> 01:33:52,050 I thought it would be helpful for public to like review it and, you know, have a chance to talk. 1216 01:33:52,050 --> 01:33:55,310 that they will have a chance in front of the city council to review it all 1217 01:33:55,310 --> 01:33:58,490 with everyone else personally or anybody. 1218 01:33:58,770 --> 01:34:01,930 It's just to start a planning commission jurisdiction item. 1219 01:34:02,410 --> 01:34:05,910 I don't think that the chair, I'm going to, I'm going to, I'm going to inject what I can do. 1220 01:34:06,090 --> 01:34:12,310 I can go ahead and I can ask, and if there's any access for it to be, if the commission 1221 01:34:12,310 --> 01:34:15,770 as a majority doesn't object, we can bring it back. 1222 01:34:15,950 --> 01:34:20,230 I don't believe it is in the jurisdiction, but I can certainly verify. 1223 01:34:20,230 --> 01:34:28,430 You'll see in the sections that were informational, I did list it, which is our first item that came back before you all this evening. 1224 01:34:29,150 --> 01:34:33,370 And I thought that was a great discussion, but I can certainly check. 1225 01:34:34,150 --> 01:34:37,930 And again, I don't object to what we did this evening, which is informational and educational, 1226 01:34:38,830 --> 01:34:47,350 but I would not recommend that the planning commission take on something that's only perfectly related to the zoning code and our planning. 1227 01:34:47,350 --> 01:34:51,590 But again, defer to the director to bring back any recommendation. 1228 01:34:52,550 --> 01:34:54,590 I just would not include it in the work plan at this point. 1229 01:34:57,120 --> 01:34:59,000 Other comments, additions, subtractions? 1230 01:35:00,340 --> 01:35:04,160 My only comment is I read it all and I like the layout. 1231 01:35:04,600 --> 01:35:07,240 I like the trainings, the informational trainings. 1232 01:35:07,940 --> 01:35:09,480 Looks like we have a full plate. 1233 01:35:11,280 --> 01:35:13,920 I think it's good. 1234 01:35:19,850 --> 01:35:23,670 So again, are you all right with my two recommendations on the addition 1235 01:35:23,670 --> 01:35:32,790 related to downtown, specific business standards and economic development as well as the ongoing 1236 01:35:32,790 --> 01:35:35,890 if available review objective versus subjective standards? 1237 01:35:36,470 --> 01:35:42,550 Yes, I think just as long as the commission understands that what we've provided you 1238 01:35:42,550 --> 01:35:49,450 is our full play, but things change, I don't have any issue with adding it, our city manager 1239 01:35:49,450 --> 01:35:52,610 and City Council, let me have a different opinion. 1240 01:35:53,430 --> 01:35:58,430 So let's not, we're not holding to what is written here. 1241 01:35:59,350 --> 01:36:01,350 Just as long as the commission knows that. 1242 01:36:01,550 --> 01:36:08,230 And this is again an attempt to strategize a little bit better annually. 1243 01:36:08,850 --> 01:36:12,250 I think these are good recommendations that I'm pulling from 1244 01:36:12,250 --> 01:36:16,030 from those studies that have occurred and I'm a new person here. 1245 01:36:16,030 --> 01:36:21,350 And so part of the goal is that our committees and commissions are moving in this direction 1246 01:36:21,350 --> 01:36:24,990 ultimately in our city council and everybody is on the same page. 1247 01:36:25,610 --> 01:36:35,050 So if I can, so I'm so glad Chair Warner brought up DSP and I know that the projects, you know, the bigger scope, 1248 01:36:35,410 --> 01:36:41,550 the original scope of the project is on hold. However, I do think there are very important parts of it 1249 01:36:41,550 --> 01:36:47,210 our low-hanging fruit that I'd love to see sooner than later, and I think Council has asked for this too, 1250 01:36:47,890 --> 01:36:55,310 and that is way-finding signs. So I don't know if that would ever come back to this. 1251 01:36:55,330 --> 01:36:59,990 It would be a kind of part of the, I think we are going to have an overall kind of general review 1252 01:36:59,990 --> 01:37:05,610 of our sign ordinances, which might include way-finding signs too. Am I correct and remembering that? 1253 01:37:05,610 --> 01:37:13,790 possibly, we do have the sign ordinance coming back. I will say that way finding signs typically 1254 01:37:13,790 --> 01:37:20,950 are in public rights of way or on public properties. There may be an opportunity where some 1255 01:37:20,950 --> 01:37:26,810 of the signage might be on a private building. But we're looking into that. That being said, it is 1256 01:37:26,810 --> 01:37:31,730 on our radar. I do want to let Commissioner Frederick know that that actually is something that 1257 01:37:31,730 --> 01:37:40,710 city managers, a big proponent of. He has asked that I'd be part of that process, whether 1258 01:37:40,710 --> 01:37:45,730 it's coming back to the commission or a different body depending on what we're proposing, 1259 01:37:46,230 --> 01:37:48,070 but that is on the radar of the city. 1260 01:37:48,410 --> 01:37:55,150 I just noticed one correction, which I think Commissioner Covell, I probably should have noted, 1261 01:37:55,150 --> 01:37:59,350 You list the general plan annual review as discretionary, 1262 01:37:59,350 --> 01:38:01,190 subject to workload and capacity. 1263 01:38:02,690 --> 01:38:05,890 I think it needs to be under the actual mandatory work plan, 1264 01:38:06,410 --> 01:38:07,830 the general plan annual review. 1265 01:38:09,090 --> 01:38:11,810 I would move it to the actual work plan. 1266 01:38:12,950 --> 01:38:16,350 So this is two different sections. 1267 01:38:16,610 --> 01:38:19,950 One are anticipated land use application projects 1268 01:38:19,950 --> 01:38:21,390 and the other policy projects. 1269 01:38:22,390 --> 01:38:26,770 it's required. We're going to bring it. 1270 01:38:27,150 --> 01:38:29,090 Well, then maybe make sure that. 1271 01:38:29,090 --> 01:38:31,470 Hopefully we do it this fiscal year. 1272 01:38:31,810 --> 01:38:33,130 We're on the motion for it. 1273 01:38:33,550 --> 01:38:41,190 We're behind, and all I want to do is make sure that this isn't listed to the city council as subject to 1274 01:38:42,390 --> 01:38:45,250 the capacity available capacity of the staff. 1275 01:38:45,450 --> 01:38:46,910 It is a mandatory item. 1276 01:38:46,910 --> 01:38:52,550 And so maybe what you just do is put general after general plan annual review put per 1277 01:38:52,550 --> 01:38:58,410 and mandatory annual or put mandatory to be sure that's that's that's reference. 1278 01:38:59,790 --> 01:39:00,990 Thank you. 1279 01:39:02,110 --> 01:39:04,330 I'll just do a little plug on that. 1280 01:39:05,430 --> 01:39:09,010 That most of our departments have reviewed. 1281 01:39:09,250 --> 01:39:15,290 They've done the first part of reviewing what our general plan policies are our next step 1282 01:39:15,290 --> 01:39:20,710 and they are aware that it will come back out to them again and when it does they'll be updating 1283 01:39:20,710 --> 01:39:25,570 what they've been what they've how they've complied and implemented the general plan over time. 1284 01:39:26,410 --> 01:39:33,330 That's going to take some handholding and some time but my goal is to get it back to you all this year. 1285 01:39:33,730 --> 01:39:39,470 Yeah, let's get it back so that when they're not backed up into the next annual review for the next year. 1286 01:39:39,470 --> 01:39:48,180 Thank you. That's all. If there's no further discussion with these comments and changes, 1287 01:39:48,940 --> 01:39:54,360 I'd entertain, do we need a motion? I think we do. It's a plan and commission action. We need to. 1288 01:39:54,360 --> 01:40:01,080 I just have a one to add to the Brown Act and Robert's rules of order TBD as necessary. 1289 01:40:02,860 --> 01:40:10,340 It would be good to just maybe have a little clarity on social media like Brown Act, 1290 01:40:10,340 --> 01:40:21,800 violations and what get a little more direction from legal and what training maybe we need some 1291 01:40:21,800 --> 01:40:27,720 training on that I think you'll hear more from me during my report. Oh good yeah that was a good 1292 01:40:27,720 --> 01:40:32,960 ad. Yeah good ad. Can you start developing? Yeah it's not as necessary it's we should be getting on going 1293 01:40:32,960 --> 01:40:39,880 updates and training on those matters as well as the secret. Okay with that I'd entertain a motion 1294 01:40:40,820 --> 01:40:44,840 for approval of the work plan as we've discussed and amended. 1295 01:40:49,850 --> 01:40:58,690 I'll make a motion to approve the work plan with the additions expressed by the commissioners. 1296 01:40:59,310 --> 01:41:00,390 Go here second. 1297 01:41:02,130 --> 01:41:02,990 Any further discussion? 1298 01:41:04,210 --> 01:41:05,670 If not, please call the roll. 1299 01:41:07,110 --> 01:41:07,910 Commissioner Colwell. 1300 01:41:09,110 --> 01:41:09,290 Yes. 1301 01:41:09,930 --> 01:41:10,550 Commissioner Lopez? 1302 01:41:11,050 --> 01:41:11,370 Yes. 1303 01:41:11,950 --> 01:41:12,670 Vice chair for it. 1304 01:41:13,010 --> 01:41:13,210 Yes. 1305 01:41:13,210 --> 01:41:22,890 Chair Warner. Yes. The motion passes unanimously. Thank you. Okay. We're on to elections. 1306 01:41:24,310 --> 01:41:29,050 Has there been any time for campaigning? No. Is that our next item and director? 1307 01:41:30,130 --> 01:41:31,330 Yes. That's our next item. 1308 01:41:33,150 --> 01:41:35,510 There's not really any presentation on this. 1309 01:41:36,070 --> 01:41:42,630 It's the way that it works is typically someone will nominate a person to be chair. 1310 01:41:42,630 --> 01:41:44,530 than people will vote. 1311 01:41:45,270 --> 01:41:47,530 There could be nominations for more than one. 1312 01:41:47,590 --> 01:41:49,590 So I just want to make sure that that's clear. 1313 01:41:50,330 --> 01:41:53,090 And once that vote is done, then you move on to Vice Chair 1314 01:41:53,090 --> 01:41:55,190 and the same process occurs. 1315 01:41:55,330 --> 01:41:56,390 No questions. 1316 01:41:56,630 --> 01:41:57,310 Are there any nominations? 1317 01:41:58,090 --> 01:42:02,110 I would like to nominate Chris Warner as Chair. 1318 01:42:02,990 --> 01:42:04,010 Okay. Thank you. 1319 01:42:04,330 --> 01:42:05,170 Any other nominations? 1320 01:42:06,850 --> 01:42:18,170 I need any any we could take take also vice chair nominations together less director you think we need to do this separately I would I would do them separately because 1321 01:42:19,090 --> 01:42:23,250 All right, let's pretend that it was voted down. 1322 01:42:23,650 --> 01:42:24,370 Okay. 1323 01:42:24,370 --> 01:42:26,590 Any further nominations? 1324 01:42:27,630 --> 01:42:38,130 I'd have a question about, like, the, the autumn's seat. Now, what happens with that if 1325 01:42:38,130 --> 01:42:45,210 somebody comes on in? Yeah, that could happen at any, I mean they might not get filled 1326 01:42:45,210 --> 01:42:52,570 for four months. So, as a really what we would have done last time was voted for another 1327 01:42:52,570 --> 01:42:58,610 chair and another vice chair but we were pretty impacted that meeting and so and for staffing 1328 01:42:58,610 --> 01:43:04,910 reasons we pushed it to this meeting but it would day would just be in line for the next 1329 01:43:04,910 --> 01:43:13,610 time which is a year out. Any further discussions or questions if not can we call for a vote 1330 01:43:13,610 --> 01:43:14,610 on the nomination. 1331 01:43:19,100 --> 01:43:21,540 I think we still have to second and then. 1332 01:43:22,580 --> 01:43:23,500 High second it. 1333 01:43:23,500 --> 01:43:23,760 Okay. 1334 01:43:33,800 --> 01:43:37,580 You can abstain if you don't want to vote. 1335 01:43:42,600 --> 01:43:43,780 Commissioner Covell? 1336 01:43:44,220 --> 01:43:44,960 abstain. 1337 01:43:45,420 --> 01:43:46,060 Commissioner Lopez? 1338 01:43:46,780 --> 01:43:46,960 Yes. 1339 01:43:47,860 --> 01:43:48,640 Vice chair Ferdick? 1340 01:43:49,680 --> 01:43:50,840 And chair Warner? 1341 01:43:51,060 --> 01:43:51,320 Yes. 1342 01:43:52,100 --> 01:43:54,620 The motion passes three to one. 1343 01:43:55,220 --> 01:43:58,340 Out three three to zero one abstain. 1344 01:44:00,430 --> 01:44:00,770 Okay. 1345 01:44:00,770 --> 01:44:07,890 nominations for Vice Chair, I would nominate Commissioner Ferdick for Vice Chair again if she is willing to accept. 1346 01:44:08,830 --> 01:44:08,970 Yes. 1347 01:44:10,370 --> 01:44:11,710 I second it. 1348 01:44:11,810 --> 01:44:14,610 First of all, any other nominations? Let's see if there are any other nominations. 1349 01:44:16,050 --> 01:44:22,470 If not, I don't think we need to technically second for an nomination, but what? 1350 01:44:23,290 --> 01:44:23,390 Yeah. 1351 01:44:24,450 --> 01:44:25,650 So any discussion? 1352 01:44:28,200 --> 01:44:30,900 If no further discussion, can we call the roll? 1353 01:44:33,340 --> 01:44:35,940 Commissioner Colwell, abstain. 1354 01:44:36,880 --> 01:44:37,580 Commissioner Lopez? 1355 01:44:38,220 --> 01:44:38,500 Yes. 1356 01:44:39,280 --> 01:44:40,000 Nice chair for it. 1357 01:44:40,280 --> 01:44:40,520 Yes. 1358 01:44:41,140 --> 01:44:41,620 Chair Warner. 1359 01:44:41,920 --> 01:44:42,160 Yes. 1360 01:44:42,440 --> 01:44:45,500 The motion passes three, zero, one, zero. 1361 01:44:47,080 --> 01:44:47,300 Okay. 1362 01:44:49,020 --> 01:44:54,720 That concludes these agenda items, but we have reports and updates from director. 1363 01:44:56,460 --> 01:44:59,960 Yes, so I have a few, some of them may not be popular, some of them may not be popular. 1364 01:45:00,000 --> 01:45:29,980 So apologize in advance. But one of them that will be popular is that we will have a training in August, and it will be our county council coming to the commission, and they will be training on Brown Act, our bylaws, our ordinance code, and you know, general conduct, during that time as well, they'll also likely be looking at those guide books that you were provided. 1365 01:45:30,000 --> 01:45:38,220 I've asked them to take a new look at those and for me to be able to look at them and we'll hopefully be presenting 1366 01:45:38,940 --> 01:45:42,980 new ones to you all that we're all in the same page and 1367 01:45:42,980 --> 01:45:45,200 our updated. So that's in 1368 01:45:46,780 --> 01:45:51,520 August and I believe it's Andreas who will be here to do that training. 1369 01:45:52,980 --> 01:45:54,940 Is that county council or city attorney? 1370 01:45:55,600 --> 01:45:56,500 What did I say? 1371 01:45:56,560 --> 01:45:57,220 Is it county council? 1372 01:45:57,220 --> 01:45:59,480 So that's automatic, that's from your car. 1373 01:45:59,480 --> 01:46:00,380 I elect from you. 1374 01:46:00,540 --> 01:46:04,640 Yeah, it's our city attorneys will be here. 1375 01:46:04,920 --> 01:46:08,760 And you might want to check around on commissioners availability 1376 01:46:08,760 --> 01:46:13,300 in August because I know I'm out last 10 days of August. 1377 01:46:13,740 --> 01:46:14,580 But others may have to. 1378 01:46:14,580 --> 01:46:16,400 I am too out of the end of August. 1379 01:46:17,080 --> 01:46:19,060 So we'll do that the meeting. 1380 01:46:19,600 --> 01:46:21,700 So let me jump to the next. 1381 01:46:22,860 --> 01:46:24,660 OK, I will check on that. 1382 01:46:25,320 --> 01:46:25,940 Thank you. 1383 01:46:26,140 --> 01:46:26,540 OK. 1384 01:46:26,540 --> 01:46:30,720 I'm going to do some positive things before I do what I think might not go over very well. 1385 01:46:31,500 --> 01:46:36,320 But you all may have heard that we're looking through through different items. 1386 01:46:36,540 --> 01:46:46,720 We were looking at providing a new service to the city that includes automated sign-up and sign-off of notifications. 1387 01:46:47,560 --> 01:46:52,820 So they can be called sometimes listserv, but basically they're interested parties list through our website. 1388 01:46:52,820 --> 01:47:07,300 And so, the public is now able to, once the word I'm looking for, thank you, subscribe for different topic areas. 1389 01:47:07,480 --> 01:47:12,020 So, for example, you might have the spring vineyard housing development. 1390 01:47:12,360 --> 01:47:18,000 You might have for our stakes here in planning the ADU ordinance, short-term rental. 1391 01:47:18,120 --> 01:47:20,460 We're creating those lists online right now. 1392 01:47:20,460 --> 01:47:29,040 They'll be notified this opportunity is going to be going out to the public on Thursday through probably a news blast 1393 01:47:29,040 --> 01:47:36,100 And we're really excited about it. I know this is something that worked really well for me in a different jurisdiction 1394 01:47:37,140 --> 01:47:37,760 and 1395 01:47:37,760 --> 01:47:40,100 luckily here in our city 1396 01:47:40,100 --> 01:47:44,140 We have the ability to have this, but we weren't using it and implementing it. 1397 01:47:48,600 --> 01:47:49,220 So 1398 01:47:49,220 --> 01:47:55,200 As much as our planning commission meetings and he heard that this was a desire and he really assisted and jumped on this for us. 1399 01:47:55,300 --> 01:47:58,880 And so I'm really excited to share that with you all. 1400 01:48:00,140 --> 01:48:06,760 The planning commission meetings are not part of that for some regulatory reason, but other general topics. 1401 01:48:06,960 --> 01:48:09,040 So you'll see, you'll see those coming forward. 1402 01:48:09,300 --> 01:48:17,080 And I recommend that you all sign up so you get some information and as individuals you can look at what's happening in our department. 1403 01:48:17,080 --> 01:48:23,160 I think that's great, and what I would suggest is that it's not a one and done notification 1404 01:48:23,160 --> 01:48:30,760 to the public to sign up periodically, you may want to go out and say, hey, please subscribe 1405 01:48:30,760 --> 01:48:34,920 if you wish to the following, because one of the things we've noticed on the planning 1406 01:48:34,920 --> 01:48:40,100 commission through various applications as well as workshops and things like that, the 1407 01:48:40,100 --> 01:48:47,060 public will come in and say, well I never heard about it, but they did, you know, they 1408 01:48:47,620 --> 01:48:58,120 So, I like the idea, and certainly, I probably am the worst offender, and then I signed up multiple times for the newsletter, so I get about five copies of the newsletter. 1409 01:48:59,960 --> 01:49:01,600 Luckily, this probably shouldn't happen. 1410 01:49:02,520 --> 01:49:03,920 But it's a great initiative. 1411 01:49:04,340 --> 01:49:04,500 Great. 1412 01:49:05,100 --> 01:49:05,400 Yeah. 1413 01:49:06,860 --> 01:49:08,980 You know, I think staffs excited to do this as well. 1414 01:49:09,140 --> 01:49:11,760 I think the public once they understand it will. 1415 01:49:11,760 --> 01:49:20,920 It'll be really helpful for being open and transparent and keeping everybody aware, so it'll be great. 1416 01:49:21,400 --> 01:49:26,280 Snail mail is kind of not trendy anymore, so this is the new way. 1417 01:49:29,160 --> 01:49:32,840 PC work plan we talked about, I'll be taking that to the City Council. 1418 01:49:33,080 --> 01:49:35,400 I'll talk with our City Manager shortly. 1419 01:49:36,940 --> 01:49:42,820 I wanted to remind the commissioners to reach out to our staff when you have items. 1420 01:49:43,060 --> 01:49:49,160 I know a commissioner for it did as well as you chair Warner but when we have items that 1421 01:49:49,160 --> 01:49:54,680 are coming it's really important and helpful for staff to be aware before we're at the meeting 1422 01:49:54,680 --> 01:49:59,100 so we're not caught off guard and so that we really want to try and be helpful to you all, 1423 01:49:59,820 --> 01:50:03,980 you know we take our job really seriously and we want to make sure that 1424 01:50:03,980 --> 01:50:11,260 yourselves in the public have ample information, and so I just really want to push that a 1425 01:50:11,260 --> 01:50:19,580 little bit more to each of you. I'll probably remind you all over and over and over for a little 1426 01:50:19,580 --> 01:50:26,120 bit. Okay, last thing, which may not be as thrilling for you all, but we are moving towards 1427 01:50:26,700 --> 01:50:32,660 at this point one planning commission meeting per month. We are short staffed. It is an exceptional 1428 01:50:32,660 --> 01:50:39,240 amount of administrative work that goes into putting in our agendas and over the last month 1429 01:50:39,240 --> 01:50:45,920 and a half we trialed our ability to do this and it really takes away from what our focus 1430 01:50:45,920 --> 01:50:54,700 plans supposed to be which is the actual work. And so we are moving towards once a month from 1431 01:50:54,700 --> 01:51:01,380 here forward. It'll be the what we thought was the second meeting of the month that allows 1432 01:51:01,380 --> 01:51:07,540 as a better opportunity we thought through this of how to plan throughout the month and make 1433 01:51:07,540 --> 01:51:15,440 sure noticing works well. I will also note that I'm in discussions of potentially amending 1434 01:51:15,440 --> 01:51:22,140 the bylaws and the reason is there's an inconsistency with what our code says. So our code says 1435 01:51:22,140 --> 01:51:30,680 one meeting per month. Our bylaws said two and so will likely be updating those. I've been here now 1436 01:51:30,680 --> 01:51:35,820 or over three months, I've observed some of the bigger projects 1437 01:51:35,820 --> 01:51:37,740 that we've taken forward with you all. 1438 01:51:37,860 --> 01:51:40,920 I don't see that there's a need for two meetings. 1439 01:51:41,960 --> 01:51:45,340 That being said, that doesn't mean that if there's a project that comes 1440 01:51:45,340 --> 01:51:50,060 forward, that deserves its own meeting, that we can't do a special meeting. 1441 01:51:51,700 --> 01:51:59,270 And that if there is, for some reason, slated, you know, five big projects, 1442 01:51:59,490 --> 01:52:00,810 you know, we'll do two meetings. 1443 01:52:00,810 --> 01:52:07,990 So, there's always that ability and that's what I'm very good at this across all the jurisdictions. 1444 01:52:08,710 --> 01:52:15,850 When there's a bottleneck that's coming, we will survey you all to see if we can get a special hearing. 1445 01:52:17,590 --> 01:52:24,130 I'm very happy about having one meeting a month with that discretion that if there's, for example, 1446 01:52:24,910 --> 01:52:30,730 time is money for a lot of applicants so that there's an application ready to come even if it seems like a small application. 1447 01:52:30,730 --> 01:52:38,770 but it's not not available for a meeting for 30 days. I'm perfectly willing to have a special 1448 01:52:38,770 --> 01:52:43,870 meeting so that the applicants don't suffer the delay, but I agree with you probably with the 1449 01:52:43,870 --> 01:52:49,050 workload you've got. You need to you have a discretion to be able to do one meeting a month. 1450 01:52:49,190 --> 01:52:54,530 Yeah, we really want to do the work. We have it. We've found that we've not been able 1451 01:52:54,530 --> 01:53:00,090 over the last month and a half and so this is a really good happy medium for us. 1452 01:53:00,090 --> 01:53:08,190 Well, and that's my big concern, too, is just that we don't delay, you know, the applicant's 1453 01:53:08,190 --> 01:53:15,870 time. And you may not know this. Actually, none of you may know this, but we had a terrible reputation 1454 01:53:16,810 --> 01:53:25,630 for decades, maybe, but years for really being slowed, you know, in our planning and building 1455 01:53:25,630 --> 01:53:34,410 department and we did I think and I wasn't involved but others were made a lot of improvements 1456 01:53:34,410 --> 01:53:39,810 in that area and I would hate for the community feel like we're taking a step back so 1457 01:53:39,810 --> 01:53:44,850 as long as you're willing to you know put a meeting put some things on you know things 1458 01:53:44,850 --> 01:53:50,090 are coming up on an agenda and applicants you know if there's an unnecessary weight we can 1459 01:53:50,090 --> 01:53:51,650 kind of pushed that through a little sooner? 1460 01:53:52,150 --> 01:53:56,410 Yeah, I will say that so far experience has been 1461 01:53:56,410 --> 01:53:59,070 the open communication with the applicants 1462 01:53:59,070 --> 01:54:03,450 has worked really well, we're moving in constant 1463 01:54:03,450 --> 01:54:06,650 direction of making that even better every time. 1464 01:54:06,910 --> 01:54:09,530 I have no desire to become less efficient 1465 01:54:10,530 --> 01:54:12,770 or less customer friendly. 1466 01:54:13,710 --> 01:54:18,190 So I kind of feel like I was brought on here to propel those things. 1467 01:54:19,250 --> 01:54:27,250 I just also want to say that usually even though I live here I work pretty far away and if I 1468 01:54:27,250 --> 01:54:32,390 start seeing like a big agenda and I have to get up at four in the morning the next day and I'm 1469 01:54:32,390 --> 01:54:37,510 an active construction guy and that's what I think I bring to the table and I've always asked 1470 01:54:37,510 --> 01:54:43,150 to other cities and I wish we had a construction guy and our plan commission well it's hard if I 1471 01:54:43,150 --> 01:54:49,070 are seeing that it gets long and debatable and I'd rather have two short ones whether they're 1472 01:54:49,070 --> 01:54:51,850 two or three hours, but then I got to sleep sometime, right? 1473 01:54:52,510 --> 01:54:57,090 I just want to say that how did it start seeing you might call in sick if it gets fruity 1474 01:54:57,090 --> 01:54:59,030 ugly because I got it making to work, too. 1475 01:54:59,490 --> 01:55:02,710 Luckily I think our code protects you. 1476 01:55:03,510 --> 01:55:04,110 That's fine. 1477 01:55:04,550 --> 01:55:09,610 Commissioner Lopez, before you benefit, we'll bring back the Hunter subdivision matter, 1478 01:55:10,290 --> 01:55:16,670 Which for some of us took eight or nine hours in one fell swoop, but good point. 1479 01:55:17,030 --> 01:55:20,990 All good, well, because the most important thing is for you is staff to pace yourself, 1480 01:55:21,090 --> 01:55:27,050 to be able to have the time to do good quality work, by the way, great quality work for this meeting today, as usual, 1481 01:55:27,670 --> 01:55:30,730 and we're happy to support you in any way we can. Thanks. 1482 01:55:31,970 --> 01:55:36,190 And I think if that's it, I think we're ready to adjourn before 8 o'clock. 1483 01:55:36,190 --> 01:55:42,750 before we adjourn on that note we are adjourning to August 18th so you wanted to make sure that 1484 01:55:42,750 --> 01:55:44,170 everybody's here. 1485 01:55:46,280 --> 01:55:50,700 I need at least a quorum so now we're down one. Let's see. We'll check. 1486 01:55:50,940 --> 01:55:55,640 And I would like to ask you what the next steps are for filling the next commissioner that 1487 01:55:55,640 --> 01:56:02,620 open seed. Thank you for that. Yes, so we have applications open and available right now. 1488 01:56:03,360 --> 01:56:16,520 One of the plugs that I would provide is that I think that there is definitely a need for anybody interested in the operations of our downtown. 1489 01:56:17,080 --> 01:56:23,760 And so, you know, the not necessarily operations, but the planning projects and having that focus area. 1490 01:56:23,760 --> 01:56:32,840 So any business owners down there, any housing, strategists, those are all welcome positions 1491 01:56:32,840 --> 01:56:35,720 here from a professional standpoint. 1492 01:56:36,140 --> 01:56:44,100 I think that that is definitely something that could benefit all of us as we move through 1493 01:56:44,100 --> 01:56:45,060 the next stages. 1494 01:56:45,480 --> 01:56:46,380 Good point. 1495 01:56:47,600 --> 01:56:49,220 I'm clear for the 18. 1496 01:56:49,320 --> 01:56:49,840 Okay, great. 1497 01:56:50,000 --> 01:56:50,520 I'm available. 1498 01:56:51,540 --> 01:56:52,940 I believe I am, but I'll double check. 1499 01:56:52,940 --> 01:56:54,960 great. And I see Michelle looking. 1500 01:57:01,660 --> 01:57:07,280 So then the August 4th meeting would be canceled. Yes. Or maybe 1501 01:57:07,280 --> 01:57:12,700 never scheduled. Yes. So we'll be looking at what the technicalities are of that. But yes, 1502 01:57:12,760 --> 01:57:18,320 we were waiting until after this evening for me to let you all know what our plan was moving forward. 1503 01:57:19,620 --> 01:57:25,620 Very good. Great work. And with that, I will, I turn our meeting. Thank you. Good work. 1504 01:57:25,780 --> 01:57:27,640 and we'd lucky for air conditioning.