1 00:00:00,000 --> 00:00:14,320 Everyone, for coming. So, my name is Matt Fonderhade. I'm the Township Administrator and Director of Warden Sewer for the Township. We have a number of very informative folks here tonight. So we'll get into introductions in a little bit. 2 00:00:14,680 --> 00:00:29,980 I would like to thank the DEAP Montana News and this here from the DEAP. The only way we would be able to do this work is because of the relationship we have with the DEAP, but the funding that they were able to provide so that ram all and 3 00:00:29,980 --> 00:00:31,980 I felt or could work on this project. 4 00:00:33,140 --> 00:00:36,640 So to give a little background, the township's been involved 5 00:00:36,640 --> 00:00:40,040 with the resident staffer, we came up with a resident staffer 6 00:00:40,040 --> 00:00:44,820 plan a few years ago, and the opportunity came about 7 00:00:44,820 --> 00:00:46,320 that there were some additional funding. 8 00:00:47,100 --> 00:00:50,180 So we have a number of projects that we've been trying to make 9 00:00:50,180 --> 00:00:51,580 the town more resilient. 10 00:00:52,300 --> 00:00:54,420 And in that process, we said, OK, well, hey, 11 00:00:54,440 --> 00:00:55,620 this is a real opportunity. 12 00:00:56,180 --> 00:00:58,340 We've had one of the things that we've 13 00:00:58,340 --> 00:01:03,060 real commitment to is to try to develop partnerships within the community. 14 00:01:03,540 --> 00:01:09,820 Pylons are green team, the civic associations, so we have B-Chable Musts of Association 15 00:01:09,820 --> 00:01:14,740 and I thank you guys for coming, but being able to have those relationships has helped 16 00:01:14,740 --> 00:01:20,640 to foster a lot of the different projects, the plans, the grants, the capital projects that 17 00:01:20,640 --> 00:01:23,980 have been done to be able to, you know, try to make the township more resilient. 18 00:01:25,000 --> 00:01:37,100 So essentially, this is our agenda tonight, we'll do an introduction, we'll go through a project overview, essentially where we've been, and then what the existing conditions are of foresight. 19 00:01:37,380 --> 00:01:47,320 So if you follow along with the township, we're fortunate enough to obtain a $5 million grant to be able to restore the popular point, which is on foresight property. 20 00:01:47,320 --> 00:01:49,520 that contract has been awarded. 21 00:01:50,080 --> 00:01:53,580 The work is going to start this upcoming year. 22 00:01:53,960 --> 00:01:58,300 So there's a dredging season that we have to operate with 23 00:01:58,300 --> 00:02:00,300 them with this between July and December. 24 00:02:01,080 --> 00:02:04,100 Unfortunately with the government shutdown that we went through 25 00:02:04,100 --> 00:02:06,100 the past couple months, we weren't able to start. 26 00:02:06,180 --> 00:02:09,680 Exactly when we wanted to start to be able to get that work done 27 00:02:09,680 --> 00:02:10,700 this year. 28 00:02:11,240 --> 00:02:14,640 That being said, everything's been awarded and it's all set to go 29 00:02:14,640 --> 00:02:18,220 for July, so we've been working with the EP on that. 30 00:02:18,840 --> 00:02:21,960 But we're also, you know, to continue it a look for funding. 31 00:02:22,040 --> 00:02:23,500 So that's why these plans are important. 32 00:02:23,820 --> 00:02:27,220 So in that same round, we've put in another grant application 33 00:02:27,860 --> 00:02:30,460 to continue to do more work with Forsythe. 34 00:02:30,940 --> 00:02:33,100 And the one thing I mentioned with partners, 35 00:02:33,580 --> 00:02:35,960 like Forsythe refuge has been an excellent partner. 36 00:02:36,140 --> 00:02:38,440 You know, the whole goal here is to make win wins. 37 00:02:38,460 --> 00:02:39,720 This is Forsythe land. 38 00:02:40,300 --> 00:02:43,540 It's a big manage it and they do an excellent job doing that. 39 00:02:44,260 --> 00:03:06,240 We're not going to do anything that they're not all bored with doing so, you know, having a good partner like that, but also realizing that, you know, the importance for their mission is to make sure that that area stays preserved and is open to open to the wildlife, what you're going to see here tonight through these plans is a preliminary. 40 00:03:06,240 --> 00:03:14,540 It's essentially like a rough draft of what the climb falter and railball have come up with through these 41 00:03:14,540 --> 00:03:24,920 Resamp staffer plans that we've done that would help us go get additional funding that being said that funding has to line up with what four sites is 42 00:03:24,920 --> 00:03:31,360 Open to do so that includes any of our partners the other thing we're working on right now is a study with the 43 00:03:31,360 --> 00:03:39,320 pay. There's 500 acres of land that the DEP owns north of Bay Avenue, so the direct opposite 44 00:03:39,320 --> 00:03:44,920 of where a foresight that is to the north on the map in the mud city section of the township. 45 00:03:45,700 --> 00:03:50,220 With that, we're doing a study right now to determine the same thing the climb falter is 46 00:03:50,220 --> 00:03:56,040 only it's more detailed. So the idea with doing these studies is we do the studies when 47 00:03:56,040 --> 00:04:02,660 opportunities come up whether it's the D.P., whether it's NOAA, whether it's national 48 00:04:02,660 --> 00:04:07,260 official wildlife. We then have the opportunity because it's not, oh hey, somebody 49 00:04:07,260 --> 00:04:12,700 had a great idea, let's go do it. No, we plan this, you know, that's why we're here tonight, 50 00:04:12,820 --> 00:04:19,280 we're doing the workshop to be able to get community input. The idea is, as we've through a 51 00:04:19,280 --> 00:04:25,540 studying that the township flunted back in 2019 and 2020 and 2021. That's how the township 52 00:04:25,540 --> 00:04:31,720 was able to obtain township by permits. And with those permits, that allowed us these 53 00:04:31,720 --> 00:04:37,420 opportunities to then say, okay, hey, D.P. saw us doing that work. Hey, can we work together? 54 00:04:37,900 --> 00:04:43,020 Four sites saw us doing that work. Hey, is there a coordination of benefits, right? We have 55 00:04:43,020 --> 00:04:49,460 Lagoon system that has material in it, that's the same material that came out of the 56 00:04:49,460 --> 00:04:50,180 bar to get bang. 57 00:04:50,500 --> 00:04:55,500 Can we take that material and then be able to restore environmental areas? 58 00:04:55,800 --> 00:05:00,840 Well, think about it from a township wide perspective, it's a win-win-win, right? 59 00:05:01,080 --> 00:05:07,400 So if we can free up the Lagoons, if we can create a better habitat and it helps the refuge 60 00:05:07,400 --> 00:05:11,660 or it helps the EPA, and we can provide a resiliency measure. 61 00:05:11,660 --> 00:05:21,240 Well now, God forbid, we get another hurricane sanding, there's a resiliency measure, there's a way to add more area for wildlife. 62 00:05:21,680 --> 00:05:30,460 So these are areas that I'm talking about that have been eroded over time, so whether it's eroded from sandy or it's eroded through regular tide cycles. 63 00:05:31,060 --> 00:05:39,240 This is area that if you look on a map five years ago, 10 years ago, 25, 30 years ago, you're going to see that there was area there before. 64 00:05:39,240 --> 00:05:44,320 So, that this material is that same material, and that's part of the reason why we study it 65 00:05:44,800 --> 00:05:55,340 because if we can determine that it's, you know, that material and it's a good type of material to be able to use it for restoration, that's what we want to do. 66 00:05:56,800 --> 00:06:03,560 So, essentially what you see there is we're talking about the Mars restoration, but then it gets into designs and logistics. 67 00:06:03,560 --> 00:06:05,720 Again, these are preliminary thoughts. 68 00:06:05,920 --> 00:06:11,200 This is like a draft of, hey, this is a concept that has the potential to be used. 69 00:06:11,560 --> 00:06:18,220 Again, what it's meant to is kind of like a night-that flame of thinking of, what can we actually get go out and get funded? 70 00:06:19,140 --> 00:06:26,200 So this is like an initial step of lands that haven't been looked at yet, so that's, you know, just keep that in mind. 71 00:06:27,620 --> 00:06:34,140 So, introductions, DEP, this doesn't happen without DEP, so thank you, Montana, for, you know, 72 00:06:34,180 --> 00:06:37,720 and DEP and all their staff for helping us do that. 73 00:06:38,060 --> 00:06:43,700 Montana has been a real asset coordinating and working with all the folks that you're going 74 00:06:43,700 --> 00:06:48,580 to hear from tonight, the township, so the mayor and the government body, without them and the 75 00:06:48,580 --> 00:06:52,240 support of the mayor and government body to say, hey, this is important to make the township 76 00:06:52,240 --> 00:06:55,680 more resilient to work for ways to work with our partners 77 00:06:55,680 --> 00:06:59,200 to try to make the community more resilient. 78 00:06:59,700 --> 00:07:01,300 We definitely want to do that. 79 00:07:01,600 --> 00:07:04,060 And then, between Kleinfeldt and Ramball, 80 00:07:04,400 --> 00:07:06,740 they're input from a planning perspective. 81 00:07:07,320 --> 00:07:08,420 You're going to hear from Simon. 82 00:07:08,500 --> 00:07:10,140 You're going to hear from Megan Jim tonight. 83 00:07:11,440 --> 00:07:13,760 They are excellent at what they do. 84 00:07:13,800 --> 00:07:15,100 That's how we got to this point. 85 00:07:15,540 --> 00:07:17,120 Do you guys want to just do a quick round? 86 00:07:17,220 --> 00:07:18,620 The Vinterductions real quick, Sam? 87 00:07:23,650 --> 00:07:29,970 I only think I really want to add on Simon Cates and with Rambal, I'm that introduced in Meg Kira. 88 00:07:30,000 --> 00:07:35,520 I just want to also mention that we have some folks joining online via Zoom, some folks from the 89 00:07:35,520 --> 00:07:40,880 community, and also from our team. So that's Sally Kramer, from Rambal, Julia Lane, from 90 00:07:40,880 --> 00:07:46,240 Kleinfield, and Brandon Raymond, from Kleinfield as well. We're going to go through the slides 91 00:07:46,240 --> 00:07:50,640 here and then we'll have a Q&A at the end. We'll take questions here in the room. Folks who have 92 00:07:50,640 --> 00:07:55,360 joined via Zoom will be able to enter their questions into the chat and so we'll be able to get 93 00:07:55,360 --> 00:08:00,680 get some discussion dialogue going both here live and also with folks who are joining us online. 94 00:08:05,510 --> 00:08:10,730 Sure, Simon Cates, I'm a senior project manager at Ram Bowl. I'm an urban planner by 95 00:08:10,730 --> 00:08:18,630 background, and I focus on flood mitigation and climate-resoling to project. So between my 96 00:08:18,630 --> 00:08:24,990 college at Ram Bowl and Jim's at Clientfelder, we have been working in this area in 97 00:08:24,990 --> 00:08:29,750 in Long Beach Island through the Resolving Long Beach Island program, and also, there's our second 98 00:08:29,750 --> 00:08:38,850 round of work with Matt in Stafford here, focused on resilience to flooding, and we've 99 00:08:38,850 --> 00:08:43,470 done similar types of projects in other parts of New Jersey, we did some work recently 100 00:08:43,470 --> 00:08:50,230 in the city of Lamberville, we do work in New York and upstate New York and down into the 101 00:08:55,890 --> 00:09:06,630 Hi everyone, my name is Mike Kirch. I'm a planner with Rambl and I have background in landscape architecture, environmental planning, focus on climate adaptation, and I'll pass it to Jim. 102 00:09:08,550 --> 00:09:14,490 Thank you. Jim Halsman, I'm with Kleinfelder. I do have two people. 103 00:09:14,490 --> 00:09:21,810 At Simon mentioned, Julie Elaine and Brandon Raman, they're on other offices, they're joining 104 00:09:21,810 --> 00:09:22,210 remotely. 105 00:09:22,330 --> 00:09:25,650 I work in our Princeton office, Kleinfield, there's a national company. 106 00:09:26,290 --> 00:09:30,870 The office here in New Jersey focuses primarily on water, wastewater, and stormwater, and 107 00:09:30,870 --> 00:09:31,210 resiliency. 108 00:09:31,890 --> 00:09:32,690 That's my background. 109 00:09:32,850 --> 00:09:33,630 I'm a civil engineer. 110 00:09:34,330 --> 00:09:37,810 I just came from the public side as a municipal engineer now, I'm back in consulting 111 00:09:37,810 --> 00:09:41,810 doing resiliency and, yeah, happy to do that. 112 00:09:41,810 --> 00:09:46,850 And Matt mentioned this governing body, but I want to give a lot of props out the mat. 113 00:09:47,610 --> 00:09:49,510 He's a big community asset for you guys. 114 00:09:49,570 --> 00:09:52,090 He knows where all the money is and he knows where to get the money. 115 00:09:52,550 --> 00:09:54,430 And that's far more than most timeships do. 116 00:09:54,770 --> 00:09:59,010 So you really are lucky that you have a really good... 117 00:10:03,500 --> 00:10:04,200 Thank you. 118 00:10:04,200 --> 00:10:04,740 Thank you, Jim. 119 00:10:04,800 --> 00:10:05,780 I appreciate it. 120 00:10:06,440 --> 00:10:12,380 But that's essentially what you're seeing is I'll tell Ray in the back this all the time. 121 00:10:12,500 --> 00:10:13,860 This is the karate kid moment. 122 00:10:13,860 --> 00:10:43,560 Right, we're waxing cars and we're paint fences because this is the hard work that goes in to go in to do, you know, going out and to do these things, so like, like I mentioned before between Jim and his staff or client founder and Megan Simon and DEP, we wouldn't be able to do this if we didn't have these folks helping us out, because there's only so much that we can individually do and to be able to take their expertise and put it into this. 123 00:10:43,860 --> 00:10:47,020 It really is a great partnership with the APA. 124 00:10:48,570 --> 00:10:53,330 So the objectives of tonight is essentially to do what we try to do on a regular basis. 125 00:10:53,530 --> 00:10:58,470 We try to do these workshops with the community, essentially to get input from the people that live here. 126 00:10:58,910 --> 00:11:07,050 But also you can see like we have other organizations in either online on Zoom or in the audience. 127 00:11:07,610 --> 00:11:11,110 Because one of the things we try to do is connect people. 128 00:11:11,110 --> 00:11:16,070 and through those connections, get the input because we can't possibly know everything. 129 00:11:16,470 --> 00:11:18,090 Every one of us in this room. 130 00:11:18,450 --> 00:11:25,150 And so the input that we receive, we take that and we apply it to the plans and the grants and the budgets that we do. 131 00:11:26,350 --> 00:11:31,390 You'll see this conceptual design, Simon, Jim and Megan are going to talk about that. 132 00:11:31,390 --> 00:11:38,750 These are essentially, again, just drafts of what could have potential for areas to look at and do more planning work into the future. 133 00:11:38,750 --> 00:11:42,410 and then we're going to answer any questions that you may have. 134 00:11:44,220 --> 00:11:49,720 So Simon mentioned this, we have folks joining us on Zoom tonight, part of the grant 135 00:11:49,720 --> 00:11:55,080 process is not only do we want the feedback, but part of the grant process is the DP wants 136 00:11:55,080 --> 00:11:59,820 to see, like, okay, we're getting community output, doing community outreach and getting input 137 00:11:59,820 --> 00:12:05,120 from the community, and obviously we're here in person. 138 00:12:05,720 --> 00:12:14,200 So, this is our timeline, the township started, we started this essentially as a part of a bigger project. 139 00:12:15,260 --> 00:12:25,220 We have a sewer system that's in need of replacement in BTW and in that process the sewer system when I started here in 2019 needed to be replaced. 140 00:12:25,760 --> 00:12:31,960 It was failing in specific sections and what we did was we came up with what we're doing tonight. 141 00:12:31,960 --> 00:12:36,100 we came up with a plan and we need to replace us. Well, during that process, that's 142 00:12:36,100 --> 00:12:40,160 when we started talking with the civic associations and getting input from residents in 143 00:12:40,160 --> 00:12:44,860 this area of the township. And they said, hey, they, you know, B. Chavin Lusk was 144 00:12:44,860 --> 00:12:49,900 dredged in the 1950s, 60, 70s. Nobody has really done any drip. 145 00:12:58,960 --> 00:13:00,820 And in that time, you 146 00:13:00,820 --> 00:13:07,040 know, to be able to do this when this B. Chavin Lusk Lagoon system was 147 00:13:16,740 --> 00:13:20,040 dredged. DEP wasn't 148 00:13:20,040 --> 00:13:22,340 around at that point. So now to be able to 149 00:13:22,340 --> 00:13:26,180 direct we had to look to say okay well what needs to be 150 00:13:26,180 --> 00:13:30,700 done to be able to open that up to the community. So we 151 00:13:30,700 --> 00:13:35,900 worked with the act engineers and with act we came up with 152 00:13:35,900 --> 00:13:41,100 a township my direct permit that came about through this 153 00:13:41,100 --> 00:13:45,180 study. As we did that study I said we built try to build 154 00:13:45,180 --> 00:13:48,640 those connections I had met with Dave Rosenblatt from 155 00:13:48,640 --> 00:13:55,600 paying and Dave had put us on to working on a resilient staffer's specific plan. 156 00:13:55,960 --> 00:13:59,840 Long Beach Island had a plan that was approved through a grant process. 157 00:14:01,440 --> 00:14:06,340 Unfortunately, the former administration did not jump into that process, so Stafford was 158 00:14:06,340 --> 00:14:07,260 left out. 159 00:14:07,580 --> 00:14:13,160 Well, the issue with that was, with that being said, the connection between all those 160 00:14:13,160 --> 00:14:17,140 communities, you have to get through Stafford to be able to get out of harm's way from 161 00:14:17,140 --> 00:14:22,800 be eye communities. So, and working with the EPA and going through that, they said, well, 162 00:14:22,800 --> 00:14:29,080 hey, we'll fund a resilient staffed project, and that's where Montana entered, and we worked 163 00:14:29,080 --> 00:14:35,800 with Ramball and Fine Felder to develop that initial plan back in 23. No, and from that 164 00:14:35,800 --> 00:14:42,940 plan, in that plan, it identifies multiple things and identifies house raises, and identifies 165 00:14:42,940 --> 00:14:48,680 the popular point project to restore popular point, which is a part of foresight. It identifies 166 00:14:48,680 --> 00:14:54,680 areas where roads could be raised. It identifies areas where the sewer system still needs 167 00:14:54,680 --> 00:14:59,320 to be replaced. You see that reflected in the township's capital plan. 168 00:15:00,000 --> 00:15:29,980 We're still in the process of replacing the sewer. B-taving wastes a huge area. It's around a little over 3,300 homes. To be able to replace all that sewer, you don't just snap your fingers and do that. So it's a well-faced process. We've been fortunate to get funding through the iBank, which DEP is also a part of through program called principle forgiveness. So every year for the last few, last four years, we've received on average around 2 million dollars to help fund that sewer. 169 00:15:30,000 --> 00:15:35,240 replacement. But the idea is, as well, to be able to raise the home, she got to replace the 170 00:15:35,240 --> 00:15:42,060 infrastructure that's in the ground, and in the process every year except for the COVID year and 171 00:15:42,060 --> 00:15:46,580 this past year, because it hasn't been available, we've been putting in for flood mitigation 172 00:15:46,580 --> 00:15:52,500 assistance grants. What those grants do are help people that are considered severely repetitive 173 00:15:52,500 --> 00:15:58,800 loss SRL or repetitive loss RRL raised their homes. So we've been successful in getting 174 00:15:58,800 --> 00:16:05,500 three of those grants. And we will continue once the thought process is those FMA 175 00:16:05,500 --> 00:16:11,340 implementation assistance grants will open up in 2026. Unfortunately, that process was an 176 00:16:11,340 --> 00:16:14,980 open this year. So we weren't able to do what we would typically do all the 177 00:16:14,980 --> 00:16:20,680 prior years. The idea of those ties back to this resilience staffer plan is if we fix the 178 00:16:20,680 --> 00:16:25,260 infrastructure, if we help to be good stewards of the land and work with our partners, 179 00:16:25,260 --> 00:16:32,660 like four sites like DEP, we can not only maintain but make the environment better through 180 00:16:32,660 --> 00:16:38,280 the sewer process. We're the only municipality that the DEP woulder quality division tells 181 00:16:38,280 --> 00:16:44,400 me. In the last, now it's 23 years, it'll be 24 years in about a year that it's cleaned up 182 00:16:44,400 --> 00:16:49,460 a major water body. From the sewer work that we've done, we've cleaned up 186 acres, which is 183 00:16:49,460 --> 00:16:54,420 the Barnaby, the Manohawk and Bay section of Barnaby, from the sewer work that's been done. 184 00:16:54,420 --> 00:17:00,100 If you look on a map for what are quality division, if you look to the north of Stachford, 185 00:17:00,220 --> 00:17:04,560 you'll look to the south of Stachford, you'll see there's issues with the, there's 186 00:17:04,560 --> 00:17:06,000 vehicle matter in those waters. 187 00:17:07,100 --> 00:17:12,840 So we've sort of a test case, right, to show, like, hey, this is what a municipality should 188 00:17:12,840 --> 00:17:13,480 look to do, right? 189 00:17:13,480 --> 00:17:19,580 If you look to maintain that infrastructure, we're not putting in, you know, what was previously 190 00:17:19,580 --> 00:17:20,080 done. 191 00:17:20,360 --> 00:17:22,360 Not only that, but we're maintaining the system. 192 00:17:22,360 --> 00:17:26,100 So, it's maintaining the system, but it's also saving the township money. 193 00:17:26,680 --> 00:17:29,420 There's something in the water and sewer world called I and I, 194 00:17:29,560 --> 00:17:31,720 it's when you get inundation into the system. 195 00:17:32,200 --> 00:17:34,500 Well, that's money that the residents of Stafford Township, 196 00:17:34,520 --> 00:17:37,900 because the system was old, it's from the 50, 60s and 70s, 197 00:17:37,960 --> 00:17:41,660 when the slogan was built, that we were paying to the OCUA, 198 00:17:41,720 --> 00:17:44,700 the regional sewer authority, that we shouldn't have been paying. 199 00:17:45,200 --> 00:17:48,300 That's roughly every year, in the last three years, 200 00:17:48,480 --> 00:17:50,100 because that's when we've seen the benefit of this, 201 00:17:50,100 --> 00:17:57,800 We've saved about a couple of hundred thousand dollars a year just in those feeds so like take that over a system that's meant to last 202 00:17:57,800 --> 00:18:00,660 50 to 60 to 75 years 203 00:18:00,660 --> 00:18:04,260 This is a dynamic environment because it's a solid environment 204 00:18:04,260 --> 00:18:10,120 but with the materials that we're replacing it with we did a minimum we should see 50 years from the 205 00:18:11,420 --> 00:18:12,260 of the 206 00:18:12,260 --> 00:18:13,060 system 207 00:18:13,060 --> 00:18:19,560 That being said the the next thing on there is where the lagoon dredging's at so it's you see there. It says 26 208 00:18:20,100 --> 00:18:27,280 The government body just approved a couple of meetings to go the contract, which would be the popular point for 209 00:18:27,280 --> 00:18:27,800 rent. 210 00:18:28,520 --> 00:18:35,240 We're hopeful we're not going to have Montana put the good word in force like Santa Claus. 211 00:18:36,160 --> 00:18:40,960 We put in a $5 million additional grant to try to do the back end portion of the popular 212 00:18:40,960 --> 00:18:45,760 point, which is a permit that we worked on with with foresight, like we've been partners. 213 00:18:46,060 --> 00:18:48,520 We don't want to do anything that they don't want to do. 214 00:18:48,520 --> 00:18:53,700 But at the same time, if we can work together as partners or restore the wildlife, why wouldn't it? 215 00:18:54,340 --> 00:18:57,920 So we're, you know, we're keeping our fingers crossed on that. 216 00:18:58,400 --> 00:19:00,180 And that's what we will see in 26. 217 00:19:03,880 --> 00:19:06,140 Next thing is the settlement sampling. 218 00:19:06,460 --> 00:19:13,100 So as a part of that Lagoon study that was done back in 2019, 2020, 2021, we added new sampling. 219 00:19:13,620 --> 00:19:19,880 The idea behind this is, well, we don't want to put material that has any contamination or, you know, 220 00:19:19,880 --> 00:19:24,020 You want to use good soil essentially to be able to rebuild the marks, right? 221 00:19:24,120 --> 00:19:28,200 We're not going to rebuild the marks with areas that need to be excavated. 222 00:19:28,640 --> 00:19:33,340 The perfect example of this is we were able to obtain a grant through ARPA funds. 223 00:19:33,480 --> 00:19:38,060 American Rescue Plan funds, where we dredged, which was also part of a resilience effort, 224 00:19:38,260 --> 00:19:49,860 a section of the township, where the stormwater from Route 72, which was owned by the 225 00:19:49,860 --> 00:19:54,900 We use those funds, and that material was not placed on any foresight refuge. 226 00:19:55,660 --> 00:19:59,360 It was taken out of the system, unfortunately, because of a stormwater. 227 00:19:59,880 --> 00:20:07,300 You can imagine that area having chemicals in it that essentially you wouldn't want to replace on a revenue. 228 00:20:07,640 --> 00:20:09,740 So that's why this sentiment sampling was important. 229 00:20:10,320 --> 00:20:12,020 That was a part of the initial study. 230 00:20:12,400 --> 00:20:15,500 We also needed that because to be able to get touch-up by permits. 231 00:20:15,500 --> 00:20:24,560 We needed Army Corps of Engineers and the DEP to say like, hey, the material that you're using is not contaminated to be able to be placed. 232 00:20:26,700 --> 00:20:29,760 So, what the resilient New Jersey program is. 233 00:20:30,440 --> 00:20:34,620 I honestly can't tell you how thankful we are working with DEP. 234 00:20:34,620 --> 00:20:38,060 The other thing that DEP is done is on their websites. 235 00:20:38,060 --> 00:20:45,640 essentially the funding for this particular program is, you know, dwindling down. So municipalities 236 00:20:45,640 --> 00:20:51,080 that are all, you know, either barrel islands or coastal towns or Bayfront towns, they've 237 00:20:51,080 --> 00:20:57,260 set up templates. So essentially, you know, we got the benefit of having a Simon, having a 238 00:20:57,260 --> 00:21:01,920 Megan, having a Jim, having a long time to be partners at the table to do it. But essentially, 239 00:21:02,120 --> 00:21:06,820 that means that, you know, another municipality, they're a administrator. They're engineers, 240 00:21:06,820 --> 00:21:12,300 their planners, they could sit down and use these templates to come up and start to do it on their own. 241 00:21:13,280 --> 00:21:18,160 That's what I take the, you know, they've essentially written the playbook, you know, we're in football season. 242 00:21:18,600 --> 00:21:23,460 So it's like, okay, we gave you all the plays, you know, hey, you're going to have to tweak them for your municipality, 243 00:21:24,160 --> 00:21:27,720 but you have the playbook for how to go do this and that's what they've done. 244 00:21:31,220 --> 00:21:37,120 So municipal assistance grant, what we're looking for is, you know, the goal essentially is, 245 00:21:37,120 --> 00:21:38,840 as well, we have a problem, right? 246 00:21:38,840 --> 00:21:40,920 Usually in local government, we call them looking problems. 247 00:21:41,440 --> 00:21:43,200 It's not an easy problem to figure out. 248 00:21:43,340 --> 00:21:46,180 So we have, what are ways that are in need of driving? 249 00:21:47,080 --> 00:21:49,420 Okay, well, you know, think of all the problems to come up. 250 00:21:49,500 --> 00:21:51,860 You've got, you know, how do we fund it, right? 251 00:21:52,160 --> 00:21:54,960 Hey, how do we, how do we take that material 252 00:21:54,960 --> 00:21:57,260 and use it responsibly, right? 253 00:21:57,260 --> 00:22:00,000 If it's contaminated, well, it's got to be taken to a certain site. 254 00:22:00,380 --> 00:22:03,160 If it's not, hey, can we use it to restore March? 255 00:22:03,500 --> 00:22:06,340 Can we use it to restore, you know, enhanced the ecosystem? 256 00:22:06,900 --> 00:22:11,560 And in the process, pay if we can do it to make the touch of more resilient in the process. 257 00:22:12,060 --> 00:22:12,840 Why wouldn't you do that? 258 00:22:13,340 --> 00:22:18,280 Like, hey, this is an opportunity not only to restore what we see on a day-to-day basis, 259 00:22:18,800 --> 00:22:24,100 but hey, how do we make it so that this area is going to continue to be here into the future? 260 00:22:24,420 --> 00:22:24,680 Right? 261 00:22:24,680 --> 00:22:29,840 And if we look at the studies and, you know, Jim, 262 00:22:30,000 --> 00:22:37,640 Be compromised with sea level rise. Okay, what are we doing to make sure that the tout chip is here going into the future? 263 00:22:39,480 --> 00:22:40,880 The other thing is erosion control. 264 00:22:42,040 --> 00:22:47,720 Just today, I was out with one of our members from the Civic Association, working with Rowan University. 265 00:22:48,040 --> 00:22:54,100 They're doing samples of dredge material for a study. Again, more planning work, right? 266 00:22:54,100 --> 00:22:58,600 planning work is not fun. It's not something to go. It's like doing homework as a kid. 267 00:22:58,900 --> 00:23:03,220 It's not the A that you come home with. It's the work you got to go out and do to be able 268 00:23:03,220 --> 00:23:07,840 to show like hey, this can work. So, you know, today we're standing out in the coach, Joe and 269 00:23:07,840 --> 00:23:14,700 I are standing out in the cold, you know, seeing soil samples being taken. But we're on an edge 270 00:23:14,700 --> 00:23:23,500 where we also got a 1.3 million dollar grant to be able to control for erosion in our 271 00:23:23,500 --> 00:23:26,600 effort that we were able to get congressional funding for. 272 00:23:28,040 --> 00:23:33,440 That's part of what these great folks are doing for us as identifying these opportunities. 273 00:23:36,970 --> 00:23:37,990 So existing conditions. 274 00:23:38,950 --> 00:23:39,390 There you go, Megan. 275 00:23:40,690 --> 00:23:41,190 Thank you. 276 00:23:44,360 --> 00:23:44,500 Great. 277 00:23:45,560 --> 00:23:49,620 So I'm going to talk a little bit about where this project is and a couple more. 278 00:23:50,480 --> 00:23:53,560 A little more background for you all. 279 00:23:53,560 --> 00:24:03,620 So this project focuses on the portion of the four-site wildlife refuge in Stafford Township in the back base, 280 00:24:03,620 --> 00:24:09,720 and it is comprised of over 1,700 acres of coastal wetlands. 281 00:24:10,920 --> 00:24:17,700 Just to the south east, south west of B.J. West and west of Popular Point, 282 00:24:18,040 --> 00:24:22,040 and it's the site is owned and managed by the U.S. Fish and Wildlife Service. 283 00:24:26,780 --> 00:24:35,900 This site is part of a greater system, so foresight is roughly 47,000 acres along the back 284 00:24:35,900 --> 00:24:43,780 base across 50 miles of and through three counties and majorities with pretty incredible 285 00:24:43,780 --> 00:24:51,440 system you have here in your state. It consists of salt marshes, coastal, unspoiled 286 00:24:51,440 --> 00:24:59,200 their beaches and some transition in upland areas. It was originally established as a 287 00:24:59,200 --> 00:25:00,840 two separate refugees. 288 00:25:03,340 --> 00:25:13,200 Barnagate in 1967 and Brigheting in 1939 and then it was combined in 289 00:25:13,200 --> 00:25:19,140 for and renamed after a conservationist, Congressmen for New Jersey, Edward B. Forza. 290 00:25:19,840 --> 00:25:26,440 And as I mentioned, it's owned and managed by US Fish and Wildlife. So, these partnerships 291 00:25:26,440 --> 00:25:32,460 are really important, as we think about this work, and go forward. I also want to mention 292 00:25:32,460 --> 00:25:40,420 that it lies within the indigenous lands of the Lenape, Lenape, who enjoyed seafood and 293 00:25:40,420 --> 00:25:43,980 land before Europeans and others will thrive. 294 00:25:45,800 --> 00:25:55,200 And now we can see some of the shoreline changes over time. 295 00:25:56,160 --> 00:25:57,220 Thank you. 296 00:26:06,640 --> 00:26:12,860 So now we can take a look at 1930 to 2020 entry from New Jersey 297 00:26:12,860 --> 00:26:17,860 machine pool, and you can see some changes, some pretty clear changes here. 298 00:26:19,220 --> 00:26:20,600 I think you haven't told us about 299 00:26:23,710 --> 00:26:25,090 it, but you can see that. 300 00:26:26,150 --> 00:26:29,650 You can see a lot of development has happened over here in BChain West. 301 00:26:33,190 --> 00:26:35,170 And let me just flip back real quick. 302 00:26:35,630 --> 00:26:47,550 And then here on the shoreline change, we've seen some erosion from storms and ongoing sea level rise, 303 00:26:47,550 --> 00:26:49,810 Here on popular point, 304 00:26:51,880 --> 00:26:54,380 oyster point and drum point. 305 00:26:54,960 --> 00:26:58,040 So these are areas that we have focused on for this front. 306 00:27:06,510 --> 00:27:11,590 So you may ask kind of like, what is the salt marsh? 307 00:27:11,730 --> 00:27:13,410 You're probably already know because it's in your backyard. 308 00:27:14,530 --> 00:27:19,850 But there are six important sections of a salt marsh that vary in relation to each other 309 00:27:19,850 --> 00:27:26,470 how they interact with water and how frequently they're inundated by tides. So you have 310 00:27:26,470 --> 00:27:33,570 the subtitle zone that's submerged all the time and then you have the title mudflat which is 311 00:27:33,570 --> 00:27:43,370 flooded at high tide but mostly submerged or mostly but not sorry flooded at high tide but 312 00:27:43,370 --> 00:27:51,710 is a mud flat at low tide, then you have low, sorry, low marsh, which is flooded at high 313 00:27:51,710 --> 00:27:57,550 tide, and then high marsh, which is only reached when you have salt spray or very high 314 00:27:57,550 --> 00:27:58,030 tides. 315 00:28:00,310 --> 00:28:06,630 And then there's the border, you have a traditional area where there's storm surge 316 00:28:07,470 --> 00:28:13,250 and where water only comes, there's storm surge, then you have the upland area. So the marsh 317 00:28:13,250 --> 00:28:20,130 here in Stafford Township follows this pattern as well and also I'd like to mention that there 318 00:28:20,130 --> 00:28:28,010 are salt pains and mosquito ditches in the marsh which are areas moderate tidal that deal moderate 319 00:28:28,010 --> 00:28:33,810 tidal ranges and that can have effective creating subtitle habitat in high marsh areas and 320 00:28:36,770 --> 00:28:42,730 might ask ourselves why we want to focus on marsh restoration and Matt brought up a lot of good points 321 00:28:42,730 --> 00:28:46,170 But coastal marshes, or wetlands, 322 00:28:46,470 --> 00:28:49,190 perform so many important functions for our environments, 323 00:28:49,890 --> 00:28:51,090 and our neighboring communities, 324 00:28:52,350 --> 00:28:56,930 and not only do they filter water, they protect from flooding, 325 00:28:57,890 --> 00:28:59,050 and they provide habitat. 326 00:28:59,570 --> 00:29:03,090 So it's really important to restore them. 327 00:29:05,770 --> 00:29:09,230 And what we're doing here is if salt marshes 328 00:29:09,230 --> 00:29:12,530 converted to mud flat, like that will limit its benefits 329 00:29:12,530 --> 00:29:22,230 for plants, animals, us, and it can have in two ways gradually due to sea level rise 330 00:29:22,230 --> 00:29:25,230 for due to human activities, such as in the sea level. 331 00:29:27,680 --> 00:29:37,160 And then I want to mention some incredible endangered but threatened and endangered 332 00:29:37,160 --> 00:29:44,560 but incredible species that are scarring around in the pipe enclosure, the red knot 333 00:29:44,560 --> 00:29:46,180 and the eastern black rail. 334 00:29:47,400 --> 00:29:48,920 And fourth site is really important 335 00:29:48,920 --> 00:29:50,900 because it's part of the Atlantic Flyway. 336 00:29:51,460 --> 00:29:53,180 So Mark Forty-Birds common go 337 00:29:53,180 --> 00:29:55,260 and stop hearing your back. 338 00:30:00,000 --> 00:30:03,900 Parts of the ecosystem and should be protected. 339 00:30:06,080 --> 00:30:12,080 And then finally, I want to just bring up our team looked at some similar and successful March Restoration 340 00:30:12,080 --> 00:30:19,080 projects, shooting Island, New Jersey and Ring Island, New Jersey. And it's important for us to 341 00:30:19,700 --> 00:30:25,420 look into projects that were successful and learn from them and see how we can bring them to 342 00:30:25,420 --> 00:30:30,400 This project is well-so shooting island over the past 40 years. 343 00:30:30,620 --> 00:30:36,880 The island scene historic and significant erosion due to wind and wave action. 344 00:30:38,820 --> 00:30:44,860 And to mitigate these forces, the original forces, the shoreline restoration project here, 345 00:30:45,600 --> 00:30:53,080 added a rock silk breakwater that would both protect and provide invertebrate habitat, 346 00:30:53,080 --> 00:30:59,080 as well as a shoreline edge that would protect the marsh behind it. 347 00:31:00,420 --> 00:31:01,960 And then over here on the Green Island, 348 00:31:04,060 --> 00:31:10,380 we have another salt marsh restoration project in New Jersey funded by National Fish and Wildlife. 349 00:31:12,320 --> 00:31:19,960 And it the goal was to restore the salt marsh and to help with beneficial reuse as well. 350 00:31:20,480 --> 00:31:24,320 So, these are two projects that we look to detail for our content. 351 00:31:38,310 --> 00:31:39,170 Thank you, Meg. 352 00:31:39,710 --> 00:31:42,110 And thanks, Matt, again, for having us here. 353 00:31:43,010 --> 00:31:47,850 I'm going to talk through some of the ideas that our team came up with for the conceptual design. 354 00:31:48,730 --> 00:31:57,510 I want to start by matching a couple of quick points here, which are that number one. 355 00:31:57,510 --> 00:32:03,530 Our team, we're multi-disciplinary, we have civil engineers, landscape architects, ecologists, 356 00:32:04,550 --> 00:32:09,410 low lead planners like myself, but it's a very broad team, and we had a lot of folks 357 00:32:09,410 --> 00:32:15,550 coming up with ideas working with Matt and his team at the township and their engineer as 358 00:32:15,550 --> 00:32:15,930 well. 359 00:32:16,330 --> 00:32:20,130 And having said all of that, I want to reiterate something that Matt pointed out at the top, 360 00:32:20,350 --> 00:32:25,610 which is that this is just a starting point, this is not detailed design, this is a 361 00:32:25,610 --> 00:32:33,490 the conceptual design study that helps move the ball forward and helps ideally secure some additional funds 362 00:32:33,490 --> 00:32:39,090 that you need in order to do that detail design phase. So, when you start doing things like flood modeling 363 00:32:39,610 --> 00:32:48,810 and really putting pen to paper, things are probably going to change, but there are some strong ideas here that are a good starting point. 364 00:32:48,810 --> 00:33:03,490 The other thing I want to highlight is that the Lagoon study in the Dredging Project and the idea of restoring the marsh here are so important to each other, right? 365 00:33:04,390 --> 00:33:11,750 They're supportive, they're synergistic, they're two different projects that are really critical for each other. 366 00:33:14,150 --> 00:33:16,390 Without a sort of marsh restoration project here, 367 00:33:17,590 --> 00:33:19,050 what are you going to do with all that dredge material? 368 00:33:19,670 --> 00:33:20,750 It's got to go to a landfill. 369 00:33:20,910 --> 00:33:22,630 It's going to cost the township a lot of money. 370 00:33:23,630 --> 00:33:25,230 Without the Lagoon dredging project, 371 00:33:25,450 --> 00:33:26,510 how are you going to restore the marsh? 372 00:33:26,670 --> 00:33:28,710 You've got to find a place to get all this material from. 373 00:33:29,330 --> 00:33:31,550 So it's a great opportunity that the township has 374 00:33:31,550 --> 00:33:34,550 that these two projects are aligned, 375 00:33:34,990 --> 00:33:38,970 spatially and also in terms of the time where they're happening. 376 00:33:39,870 --> 00:33:44,210 There's four components that we came up with here in terms of the sort of physical design. 377 00:33:44,950 --> 00:33:49,030 The logistics are also critical, and Jim is going to talk about that in a few moments. 378 00:33:49,850 --> 00:33:55,290 In terms of the sort of spatial components, there's filling the mosquito ditches, 379 00:33:55,610 --> 00:34:01,350 which Meg talked about restoring pireal connectivity, thin layer placement of that regent material, 380 00:34:02,190 --> 00:34:08,030 and creating a March sale at the edge to prevent erosion and mitigate the way of action. 381 00:34:08,030 --> 00:34:35,310 So I'm going to go through each of these, one by one, starting with the mosquito ditches and the idea here is we have these measures that we're sort of put into place over the course of decades that interrupted the title connectivity, they were intended to promote habitat and concentrate mosquitoes in different parts of the marsh. 382 00:34:35,310 --> 00:34:47,190 It's these sort of parallel lines that you see in all these sort of newer or sort of modern or sort of impacted marsh landscapes. 383 00:34:47,950 --> 00:34:55,570 We want to fill these in in order to again restore that title connectivity or contribute to that. 384 00:34:55,770 --> 00:34:59,410 Don't talk about it in a moment, but also provide provide more habitats. 385 00:34:59,410 --> 00:35:02,170 So on the sort of left side of the screen, 386 00:35:02,410 --> 00:35:05,530 you see one of these mosquito ditches that has a depth to it, right? 387 00:35:05,550 --> 00:35:08,710 There's water flowing through there, and that means 388 00:35:08,710 --> 00:35:12,790 that there is the soil coming up toward the surface, 389 00:35:13,590 --> 00:35:18,110 providing a place for native vegetation and habitat. 390 00:35:19,510 --> 00:35:21,990 So bringing these mosquito ditches back 391 00:35:21,990 --> 00:35:24,490 to a more natural condition will provide more habitat 392 00:35:25,290 --> 00:35:26,370 support sedimentation. 393 00:35:26,650 --> 00:35:28,430 So we're trying to reduce some of that erosion 394 00:35:28,430 --> 00:35:34,130 that happens over time and contributing to a healthier 395 00:35:34,130 --> 00:35:34,990 market of the time. 396 00:35:36,810 --> 00:35:40,310 So the feeling that mosquito stitches is the first piece here. 397 00:35:42,790 --> 00:35:44,970 The second one is restoring the title connectivity. 398 00:35:45,590 --> 00:35:50,150 So if you look at the sort of area that's kind of underlaying here, 399 00:35:50,490 --> 00:35:53,070 and if you look in the bottom middle of the slide, 400 00:35:53,550 --> 00:35:56,290 where you can see all of these sort of squiggly lines, right? 401 00:35:56,530 --> 00:35:59,750 That's a part of the marsh here that is healthier. 402 00:35:59,750 --> 00:36:05,230 It's been less impacted over time by human development and changes to the marsh. 403 00:36:06,290 --> 00:36:09,910 And those runnels, those, those, those, those, those, those, those almost creeps that are 404 00:36:09,910 --> 00:36:15,590 cutting through the marsh, are, are that natural tidal connectivity that you see in, in a marshland 405 00:36:15,590 --> 00:36:21,270 that hasn't been impacted or, or is, or is healthier, and, and, and that's what we want 406 00:36:21,270 --> 00:36:22,630 instead of the mosquito ditches. 407 00:36:22,730 --> 00:36:28,910 We want these more sort of natural, natural habitats that are still still allowing the, the sort 408 00:36:28,910 --> 00:36:36,650 to hide the command and bring that flow of water, but they're also bringing sediment that's contributing 409 00:36:36,650 --> 00:36:38,990 to the sustainability of the marsh. 410 00:36:39,990 --> 00:36:45,350 So restoring the tidal conductivity is about enhancing these runals or these sort of creeks 411 00:36:45,350 --> 00:36:47,110 almost that are cutting through the marsh. 412 00:36:47,930 --> 00:36:52,950 So that's restoring this hydraulic function, this exchange of water between the bay and the 413 00:36:54,270 --> 00:36:59,250 It's improving that high-marish habitat and promoting that equation. 414 00:36:59,870 --> 00:37:05,190 So in other words, the marsh, when it erodes, there are sort of two things that are happening 415 00:37:05,190 --> 00:37:07,570 that are causing it to degrade over time. 416 00:37:07,910 --> 00:37:12,150 It's that sediment leaving the marsh and it's also, it's not keeping pace with sea level rise. 417 00:37:13,470 --> 00:37:18,870 So by restoring this title connectivity with these runnels that are cutting through the marsh, 418 00:37:18,870 --> 00:37:25,690 You're also providing a way for this natural flow between the bay and the marsh to bring sediment in, right, and help too. 419 00:37:30,000 --> 00:37:37,140 And help to sort of build up that march over time, even as even as sea level continues to rise. 420 00:37:39,780 --> 00:37:46,080 The third component here is thin layer placement. By the way, each of these have an aspect 421 00:37:46,080 --> 00:37:53,200 of sort of trading with the sediment transport from dredging the lagoon and bringing that 422 00:37:53,200 --> 00:37:55,580 material over, over to the marsh. 423 00:37:55,980 --> 00:37:59,080 And thin layer placement is directly about that, right? 424 00:37:59,280 --> 00:38:00,260 thin layer placement of what? 425 00:38:01,280 --> 00:38:02,980 It's beneficial reuse of dredge material. 426 00:38:04,140 --> 00:38:07,840 And so what's happening is that that dredging action 427 00:38:07,840 --> 00:38:11,140 from the lagoon is bringing that dredge material, 428 00:38:11,680 --> 00:38:12,340 which has been tested. 429 00:38:12,700 --> 00:38:13,220 It's not toxic. 430 00:38:13,960 --> 00:38:14,980 It's healthy for the marsh. 431 00:38:15,360 --> 00:38:16,800 There's different types of dredge material, 432 00:38:16,920 --> 00:38:18,700 finer grain or coarse grain. 433 00:38:20,680 --> 00:38:25,900 But it's applying a thin layer of that direct material to the marsh to build it up. 434 00:38:27,740 --> 00:38:34,220 And what's important here is that you can't just dump multiple feet of direct material on top of the marsh. 435 00:38:34,500 --> 00:38:36,860 It'll sort of drown the habitat underneath. 436 00:38:37,800 --> 00:38:39,540 And so this has to happen incrementally. 437 00:38:40,120 --> 00:38:41,540 It's in inches, it's not in feet. 438 00:38:42,940 --> 00:38:46,980 And what that means is that it's not like all of a sudden your marsh is a storm surge barrier. 439 00:38:46,980 --> 00:38:52,420 right? It's not what it's doing. It could happen incrementally, right? There could be a layer that's applied 440 00:38:52,420 --> 00:38:57,120 at one period of time and then another layer at another period of time in the future. 441 00:38:58,640 --> 00:39:03,460 But it's incremental, thin, thin being the operative word and thin layer placement, right? 442 00:39:04,500 --> 00:39:15,340 However, having said that, the marsh keeping pace with sea level rise is also part of a piece of the 443 00:39:15,340 --> 00:39:19,360 flood mitigation and protection for the township, right? 444 00:39:19,740 --> 00:39:22,780 You think about that sort of southwestern portion of B. 445 00:39:22,980 --> 00:39:27,540 Chavin West, which gets, which takes the brunt of a, you know, way 446 00:39:27,540 --> 00:39:31,900 of action from, from a northeastern that's coming in from, from the south, 447 00:39:32,980 --> 00:39:33,740 south-east, right? 448 00:39:35,100 --> 00:39:38,780 And I'm going to talk about the, the Marseille in a moment, which is a piece 449 00:39:38,780 --> 00:39:39,560 of this. 450 00:39:39,860 --> 00:39:43,620 But the Marseille itself and having that Marseille, a creed over time and 451 00:39:43,620 --> 00:39:50,660 up over time is like a long, a long way of attenuation, right? So over this long distance from 452 00:39:50,660 --> 00:39:55,720 the Bay all the way, all the way to the southern portion of B.J. in West, you have this 453 00:39:55,720 --> 00:40:01,080 feature that is tamping down waves. It's not a floodball, right? It's not doing that, 454 00:40:01,140 --> 00:40:04,540 but it's helping to mitigate those waves over that long stretch, 455 00:40:07,000 --> 00:40:08,920 right? And so increasing 456 00:40:08,920 --> 00:40:15,460 the elevation of the marsh through within layer placement. It's building up, it's a great 457 00:40:15,980 --> 00:40:20,820 beneficial use of locally dredge material. As I said, it's a place to put that dredge 458 00:40:20,820 --> 00:40:25,820 material, so you don't have to pay to put it in a landfill somewhere. And it's helping 459 00:40:25,820 --> 00:40:31,700 to support habitat and ecosystem restoration of the marsh as it gets built up of the time. 460 00:40:33,740 --> 00:40:38,520 And the final portion that I'm going to talk about is restoration or creation of this 461 00:40:39,260 --> 00:40:45,780 So Meg talked about how the edge of that marsh has eroded over time, not a ton, right? 462 00:40:46,280 --> 00:40:52,460 It's not like the marsh has retreated so far from the bay, but it's retreated somewhat. 463 00:40:53,220 --> 00:40:55,160 And we want to sort of strengthen that edge. 464 00:40:55,300 --> 00:40:57,800 We build it back out to the 1977 tide line. 465 00:40:58,300 --> 00:41:06,240 And also be mindful that we can look to the past, you know, the erosion that's happened isn't dramatic yet. 466 00:41:06,240 --> 00:41:12,580 We also want to be mindful of what we expect to happen in the future as as the sea level continues to rise. 467 00:41:12,740 --> 00:41:15,680 It makes sure that that doesn't continue to drown. 468 00:41:16,260 --> 00:41:17,700 Drown the margin or road that edge. 469 00:41:18,880 --> 00:41:22,580 So the marxill is helping to accomplish that. 470 00:41:23,560 --> 00:41:31,120 I'm going to show a little bit more detail about these two alternatives or two examples of marxill measures on the next slide. 471 00:41:31,420 --> 00:41:33,840 But I want to point out here first what they are. 472 00:41:34,620 --> 00:41:40,320 You can see along the edge of the marsh there's some areas where there's a red line 473 00:41:43,940 --> 00:41:46,280 and other areas where there's a yellow line. 474 00:41:47,160 --> 00:41:52,340 The marsh still that's in red is we're calling that configuration one. 475 00:41:52,520 --> 00:42:00,320 That's for areas that are more exposed to wave action and they need a sort of heavier or a stronger seal structure in place. 476 00:42:00,320 --> 00:42:06,720 The areas where there's yellow are less exposed to wave action, and they can be softer, 477 00:42:06,960 --> 00:42:09,060 they can be a bit more of a nature-based solution. 478 00:42:09,240 --> 00:42:12,860 Both have components of nature-based solutions, but that's the difference between the two, 479 00:42:13,220 --> 00:42:15,700 is the one that really needs a little bit more armor and protection, 480 00:42:15,820 --> 00:42:17,440 so that it can remain in place. 481 00:42:20,900 --> 00:42:24,060 And here's a bit about what these two examples look like. 482 00:42:24,060 --> 00:42:29,300 The one on the top is for higher wave energy, and you can see on the sort of top left 483 00:42:29,300 --> 00:42:43,200 the screen that trapezoid is that is meant to hold that edge in place and allow for sediment 484 00:42:43,200 --> 00:42:47,820 to build up behind it so that it can remain in place. 485 00:42:48,920 --> 00:42:53,640 You can see on the right side of the diagram, this top diagram, all of these acronyms, 486 00:42:54,620 --> 00:43:02,600 mhw mean higher high water and lw mean lower low water that's sort of like your high tide in your low tide right and you can see that 487 00:43:03,580 --> 00:43:06,240 that's still that edge of of this of this 488 00:43:08,240 --> 00:43:10,020 Marsill is above 489 00:43:10,760 --> 00:43:16,380 Low tide and below high tide so it'll be exposed during part of the you know part of the tide cycle 490 00:43:16,380 --> 00:43:20,720 And it'll be it'll be hidden under the under the sort of high tide during part of the tide cycle 491 00:43:20,720 --> 00:43:24,340 So that's that low marsh cycle that Meg was talking about. 492 00:43:25,060 --> 00:43:28,640 The example on the bottom, this configuration 2 for lower wave energy, 493 00:43:29,700 --> 00:43:32,340 you can see you can almost barely see it on the screen here, 494 00:43:32,440 --> 00:43:34,580 but there's a very tiny sill on the edge. 495 00:43:35,480 --> 00:43:38,980 And it doesn't need to be as robust or as armored, 496 00:43:39,540 --> 00:43:42,340 because these are parts of the marsh that are not exposed to that wave energy. 497 00:43:42,540 --> 00:43:46,580 So this is where there's an opportunity to use the softer solution. 498 00:43:46,580 --> 00:43:50,800 And it's still going to collect sediment behind it, 499 00:43:50,920 --> 00:43:53,500 and still going to build up that seal of that low marsh. 500 00:43:54,020 --> 00:43:55,620 So it keeps that edge in place, 501 00:43:56,300 --> 00:43:57,640 and you don't have to worry as much about that 502 00:43:57,640 --> 00:43:58,300 erosion over time. 503 00:43:59,120 --> 00:44:02,340 Both of these examples also have some height to them. 504 00:44:02,460 --> 00:44:05,780 And you can see that, especially in the diagram at the top, 505 00:44:06,020 --> 00:44:07,540 and the right side of that diagram, 506 00:44:08,120 --> 00:44:12,860 it's getting up to about three or four feet above sea level. 507 00:44:14,360 --> 00:44:15,520 And what is that doing? 508 00:44:15,520 --> 00:44:17,200 Again, this is not a flood wall, right? 509 00:44:17,340 --> 00:44:22,680 This is not preventing water from getting all the way into the top of the marsh or even to 510 00:44:22,680 --> 00:44:23,460 be chipping west. 511 00:44:24,340 --> 00:44:27,600 The reason for that is that you want that tidal connectivity for a healthy marsh, right? 512 00:44:27,640 --> 00:44:30,220 You don't want to block the water from getting in at all. 513 00:44:30,760 --> 00:44:32,160 It's really about wave action, right? 514 00:44:32,200 --> 00:44:37,260 It's about those larger storms, they're going to hit that sort of almost-dune structure of 515 00:44:37,260 --> 00:44:41,700 the sill and it's going to tamp down those waves so that they're not going to run as far up 516 00:44:41,700 --> 00:44:41,940 upland. 517 00:44:42,420 --> 00:44:45,380 And when they do, they're not going to have as much energy that's going to cause 518 00:44:47,080 --> 00:44:52,100 So that's, those are some of the key functions of the Mars still here. 519 00:44:53,320 --> 00:44:58,260 And with that, I'm going to turn it to Jim to talk through the logistics here. 520 00:45:02,960 --> 00:45:32,940 Thank you, Simon. So I do want to talk a little bit about the logistics. So the logistics is really going to be the how are we going to do this? And let me just re-emphasize where in a very conceptual design here. So like what you're going to see is not necessarily how this will play out, but I just want to emphasize that this is a very important part of the design. Once you've seen a conceptual design, but what we also will have to do is to, all of those components that Simon just explained, we're going to have to 521 00:45:32,940 --> 00:45:38,180 figure out how that's going to be done in the most efficient and cost effective manner. 522 00:45:38,700 --> 00:45:42,540 We're also going to have to figure out when it's going to be done, not just in the calendar 523 00:45:42,540 --> 00:45:49,940 year, because we will have to deal with permitting restrictions because of habitat, because of fish, 524 00:45:51,560 --> 00:46:00,720 cycling, or the fisheries, obviously recreational season. So how we exactly do that in which sequence 525 00:46:00,720 --> 00:46:06,200 become very important. So we really want to, we will have to spend a lot of time in the design 526 00:46:06,200 --> 00:46:14,620 actually figuring out the construction sequence, the permitting, what's really nice in this project, 527 00:46:14,760 --> 00:46:21,120 is Matt has a dredging permit for probably more sediment than we could ever really need. He's going to 528 00:46:21,120 --> 00:46:27,240 use part of it in the next year's popular point project, but really it presents an opportunity for us to then 529 00:46:27,240 --> 00:46:31,940 figure out how do we get that source material to the march? 530 00:46:32,900 --> 00:46:36,000 And I want to emphasize, again, this is really a beneficial reuse. 531 00:46:36,280 --> 00:46:39,520 And that's really important because when you're just 532 00:46:39,520 --> 00:46:43,580 dredging a waterways for navigation or for recreation, 533 00:46:44,460 --> 00:46:46,520 you have a lot of sediment to dispose of. 534 00:46:46,520 --> 00:46:50,380 I mean, we're talking 10,000, if not hundreds of thousands of cubic 535 00:46:50,380 --> 00:47:02,020 here. Previous practices we've put those in confined disposal CDF's confined disposal facility. 536 00:47:02,900 --> 00:47:11,320 But here we can use that for beneficial reuse to rest restored in this case of the march. 537 00:47:12,600 --> 00:47:17,880 So there's really, conceptually, what we're looking at is probably doing hydraulic 538 00:47:17,880 --> 00:47:21,980 I think that's what's going to be part of the popular point project next year. 539 00:47:22,660 --> 00:47:27,000 You can also do mechanical judging, but for an area that we're talking about in and around 540 00:47:27,000 --> 00:47:31,960 the lagoon in the bay, hydraulic judging really becomes the preferred option because 541 00:47:31,960 --> 00:47:36,020 you can pump it into various parts of the march. 542 00:47:36,220 --> 00:47:39,600 This march has a fairly large footprint. 543 00:47:39,840 --> 00:47:43,900 There's interior portions of the march where if we were to do this mechanically we'd have 544 00:47:43,900 --> 00:47:48,600 a lot of heavy equipment working in and around the marsh and we'd like to avoid that as much 545 00:47:48,600 --> 00:47:54,620 as possible. The nice thing about hydraulic dredging is based on the sediment sampling plan, 546 00:47:54,800 --> 00:48:04,680 we can break down and mobilize the dredging operation where it's starting to dredge out the material 547 00:48:04,680 --> 00:48:11,380 and place it really wherever we want. And that's important because we haven't talked too much 548 00:48:11,380 --> 00:48:16,080 about the different practices, but we do their, the sediment sampling revealed there's different 549 00:48:16,080 --> 00:48:25,480 size sediment grains in the around the butt, the bay, and the lagoon irks. We really want the 550 00:48:25,480 --> 00:48:30,580 finer sediment, that's kind of the silt, what you might call muck, that's going to be more 551 00:48:30,580 --> 00:48:37,120 nourishing and provide a better soil matrix in the interior portions of the marsh, behind 552 00:48:37,120 --> 00:48:41,560 the sill that Simon just described, we're probably going to want course material a little bit 553 00:48:41,560 --> 00:48:47,860 more sander material. And the sentiments that they've sampled have both. So depending 554 00:48:47,860 --> 00:48:52,600 on where we're working in that, that's going to also direct where we're going to be taking 555 00:48:52,600 --> 00:48:57,000 the source material from. I'm going to of course we're going to have the permit or we're 556 00:48:57,000 --> 00:49:02,620 going to have to coordinate with the NJDP, with the Corps of Engineers, Fish and Wildlife, 557 00:49:02,620 --> 00:49:05,220 if they've had a number of conversations 558 00:49:05,220 --> 00:49:08,740 and input into the permits that have been granted so far. 559 00:49:11,390 --> 00:49:16,130 So this is a good example of a mosquito ditch, 560 00:49:16,350 --> 00:49:20,110 like firsthand, what's really important to understand 561 00:49:20,110 --> 00:49:24,370 in these nature-based practices is elevation 562 00:49:24,370 --> 00:49:25,670 really is everything in the water. 563 00:49:26,210 --> 00:49:27,750 We showed you some of those elevations 564 00:49:27,750 --> 00:49:32,030 from mean low water to mean high tide. 565 00:49:32,310 --> 00:49:34,610 Sometimes that's only two or three feet. 566 00:49:34,610 --> 00:49:39,670 And I bet we don't have exact topo, but I think I've seen some of the topography from the other thing. 567 00:49:40,050 --> 00:49:43,670 You might be talking about a total elevation difference of lesson five feet. 568 00:49:43,670 --> 00:49:45,870 That's up to my nose to the floor. 569 00:49:46,550 --> 00:49:51,330 So really inches become critical in the different ecosystems within the march. 570 00:49:52,270 --> 00:49:58,570 With a mosquito ditch, that bottom of that ditch there really is below the low, mean low high water. 571 00:49:58,850 --> 00:50:04,270 It really is too low because it was dredged out and ditched to support any kind of vegetation. 572 00:50:04,270 --> 00:50:12,070 that core grass that's far tiny there, on either side of the ditch, simply can't grow in that kind of depth. 573 00:50:12,710 --> 00:50:18,590 So what we're going to do in the design is figure out what's the best way to start filling those ditches. 574 00:50:18,590 --> 00:50:24,810 Now there's a couple ways we can do that. We can put a channel block, typically some kind of natural material like cables, 575 00:50:25,590 --> 00:50:33,070 that will block that channel, and as the dredge material gets discharged into that ditch, it starts to fill up. 576 00:50:33,070 --> 00:50:34,510 It starts to consolidate. 577 00:50:35,310 --> 00:50:38,610 It's initially a slurry, probably about 80 to 90% water, 578 00:50:38,990 --> 00:50:41,290 but it does contain fair amounts of sediment. 579 00:50:42,230 --> 00:50:44,550 That's going to eventually de-water and settle. 580 00:50:45,430 --> 00:50:48,090 And that's going to start bringing up the bottom of that ditch. 581 00:50:49,210 --> 00:50:52,090 We can also do it in what we call, like, 582 00:50:52,130 --> 00:50:55,470 even call a pre-treatment of the ditch itself. 583 00:50:55,730 --> 00:50:59,670 We could line part of that ditch with, like, 584 00:50:59,690 --> 00:51:01,410 straw, roughing up the surface, 585 00:51:01,410 --> 00:51:09,390 So that if some of the sediment gets discharged onto the higher portions where we wanted to start that thin left, 586 00:51:10,170 --> 00:51:18,910 as that water runs off into that ditch, now it's slow down when water is slow as you probably know, it starts to drop the sediments. 587 00:51:20,210 --> 00:51:27,670 Sandy sediments get dropped first as it slows, and then as you go into the almost point where the water becomes still, 588 00:51:27,670 --> 00:51:31,990 then you get the set of the finest set of its falling out. 589 00:51:32,670 --> 00:51:34,970 So that's really how we sequence this. 590 00:51:35,090 --> 00:51:37,910 We haven't actually figured out because we don't have a full design. 591 00:51:38,630 --> 00:51:40,670 But it could happen a number of ways. 592 00:51:42,610 --> 00:51:44,010 I'm going to come back to that. 593 00:51:44,170 --> 00:51:50,270 So here we have what could work these white lines you're seeing are what we call cells. 594 00:51:51,150 --> 00:51:56,150 So we might put some type of containment, not like a wall or fence, 595 00:51:56,150 --> 00:52:05,250 but some type of filter sock or core C-O-I-R core fiber logs, they act like little barriers 596 00:52:05,250 --> 00:52:07,430 and we kind of create little weighty pools. 597 00:52:07,770 --> 00:52:12,450 And as the sediment gets discharged and each one of these cells, it does a couple things. 598 00:52:12,590 --> 00:52:14,150 It starts that thin layer placement. 599 00:52:14,710 --> 00:52:19,570 Some of that water will run off into the natural low spots, like the mosquito ditches, 600 00:52:19,570 --> 00:52:21,510 and we'll start to settle into fill. 601 00:52:22,570 --> 00:52:29,970 So, as you can see, this is a fairly large area. So, we're obviously taking this. 602 00:52:34,080 --> 00:52:41,000 We need to know free. That has to transport quite a distance. I mean, we don't want to have. 603 00:52:41,320 --> 00:52:49,580 You know, construction type of dump trucks, off road dump trucks, excavators, working in areas, much as we want to minimize that as much as possible. 604 00:52:50,340 --> 00:52:56,520 So, having a pipeline for discharge and hydraulic judging really can span that distance. 605 00:52:56,640 --> 00:53:00,580 And then we can move that and create a discharge point, almost anywhere we want. 606 00:53:01,600 --> 00:53:09,480 So let me go back to the title precursor, and these runnels, you might be wondering why would 607 00:53:09,480 --> 00:53:13,960 we create a runnel, which looks like a mosquito did right after we've filled some of the 608 00:53:13,960 --> 00:53:14,380 mosquito digits. 609 00:53:14,860 --> 00:53:19,600 The difference is, these runnels, first of all, they're not nearly as deep as the misguided 610 00:53:19,600 --> 00:53:19,960 digits. 611 00:53:20,160 --> 00:53:25,520 I mentioned the elevation of the bottom of that mosquito ditch being below mean low water. 612 00:53:26,120 --> 00:53:28,680 Well, that doesn't allow any vegetation to grow. 613 00:53:29,980 --> 00:53:35,020 These runnels, as you see, 30 by 30 centimeters, that's about a foot, foot wide, foot deep. 614 00:53:35,580 --> 00:53:40,660 They would be placed above the mean low water, so that's going to allow some of the 615 00:53:40,660 --> 00:53:42,540 core grass to spark tiny to grow. 616 00:53:44,100 --> 00:53:49,620 And it's going to allow, like I think Simon mentioned, the title, Ebb and Flo, to go into 617 00:53:49,620 --> 00:53:50,880 deeper portions of the march. 618 00:53:51,220 --> 00:53:55,520 And that's really the difference between like those mosquito ditches and these runnels. 619 00:53:56,140 --> 00:54:02,180 Some of these, you see that before pictures, those are like salt water pans, they've kind 620 00:54:02,180 --> 00:54:07,820 of become isolated, they get a high tide but they can't discharge on the diurnal circles, 621 00:54:09,160 --> 00:54:10,640 cycles of a tide. 622 00:54:11,480 --> 00:54:16,360 So by allowing these, creating these runals, that restores that tidal connection. 623 00:54:17,080 --> 00:54:20,580 So this might be an area though where we do have to have some mechanical equipment, 624 00:54:25,500 --> 00:54:25,500 like 625 00:54:25,500 --> 00:54:31,220 pressure to create those runnels. And that's going to be a fairly light touch, but you know 626 00:54:31,220 --> 00:54:38,420 that is going to be more of the mechanical touching up portions where we want to create those runnels. 627 00:54:40,000 --> 00:54:45,700 But again, and it great expands like that with high pressure discharge from a hydraulic 628 00:54:45,700 --> 00:54:51,040 drip, you can almost do like a, you can almost imagine like irrigation, but rather just spring water, 629 00:54:51,040 --> 00:54:56,380 It's water laden with sediment, which is going to help nourish and start filling that marsh. 630 00:55:01,240 --> 00:55:07,760 So, the key thing is, yeah, we're going to design the sequencing directly into that plan. 631 00:55:08,260 --> 00:55:14,500 And as we get further along in a design, we would take all those considerations into play. 632 00:55:14,840 --> 00:55:21,420 It really does become kind of an orchestration of, where are we going to, when are we getting it? 633 00:55:21,420 --> 00:55:27,780 How's it going to be placed and this might be a multi-year effort because the thin layer of placement is Simon mentioned isn't going to happen overnight 634 00:55:27,780 --> 00:55:35,600 You know, we might be talking four to six inches any given season or over a course of a multi-phase project. So 635 00:55:37,200 --> 00:55:41,860 That's the hopefully the how and one how we're going to do so next steps 636 00:55:44,300 --> 00:55:46,900 You want to talk Matt or 637 00:55:47,780 --> 00:55:51,690 But this is yeah, this is our part. So this effort that 638 00:55:54,970 --> 00:55:56,830 We are actually wrapping this up. 639 00:55:57,990 --> 00:56:04,450 This presentation is actually the finalizing everything that we've had. 640 00:56:04,630 --> 00:56:05,990 We wanted to present it to the public. 641 00:56:06,730 --> 00:56:10,890 We are going to be doing a final report on behalf of NJDPs. 642 00:56:10,910 --> 00:56:13,650 I'm going to name it to Stafford. 643 00:56:15,390 --> 00:56:18,610 We have to get to part of that. 644 00:56:18,610 --> 00:56:22,910 obviously now we'll hand that off to Matt that will be the basis for them to submit 645 00:56:22,910 --> 00:56:29,670 for additional grants to do get funding for design, get funding for the other permits. 646 00:56:31,150 --> 00:56:35,450 When you apply for these grants, they really want a good action plan and that's really the benefit 647 00:56:35,450 --> 00:56:40,670 of what we've done today is staff are based on this conceptual design. 648 00:56:40,990 --> 00:56:45,750 Really have a good master plan for the next level of grants. 649 00:56:47,850 --> 00:56:51,650 even NJDP, nobody gives you a bag of cash to go do a big project. 650 00:56:52,270 --> 00:56:54,410 They want to see exactly what you're going to do. 651 00:56:54,670 --> 00:56:58,150 So now, with this conceptual design, we're going to have a better idea. 652 00:56:59,730 --> 00:57:01,750 And I'll let Matt talk about the last bullet point, 653 00:57:02,510 --> 00:57:03,790 and then we'll take some questions. 654 00:57:05,170 --> 00:57:06,830 As we're just about over five minutes. 655 00:57:14,390 --> 00:57:17,850 Like it said, that last bullet point is really the whole, 656 00:57:17,970 --> 00:57:20,470 this is kind of the whole things, the proofs and the pudding. 657 00:57:20,470 --> 00:57:32,990 We have to get through that planning process, so between Climbelder and Rambel, they've helped give us essentially the opportunity to be able to go after these different bunnings. 658 00:57:33,170 --> 00:57:35,710 It's the same thing that we did with Rzeigh and Stafford. 659 00:57:36,050 --> 00:57:38,590 It opens up that process for us. 660 00:57:38,670 --> 00:57:40,250 So that's essentially what we'll do. 661 00:57:40,810 --> 00:57:42,270 It's state federal sources. 662 00:57:42,750 --> 00:57:44,890 We're going to look at any source that comes out. 663 00:57:44,890 --> 00:57:57,190 And there was an opportunity that we put in a couple months ago through one of the, there was a wind project that was being worked on that there was crap on it. 664 00:57:57,390 --> 00:58:04,190 Well, if we can make and restore the wildlife, you know, we're going to look for any and all opportunities to come up. 665 00:58:04,290 --> 00:58:05,990 So that's what we'll continue to do. 666 00:58:06,750 --> 00:58:09,330 So I think at that point we'll turn it over to the audience. 667 00:58:09,330 --> 00:58:16,950 So if anybody has any questions or if you can put on your own doing things, anybody has any questions, feel free to ask. 668 00:58:20,530 --> 00:58:21,350 Let's say here. 669 00:58:26,940 --> 00:58:29,940 Just watch it, but it's time to get turn it off. 670 00:58:32,820 --> 00:58:33,380 Hello. 671 00:58:35,700 --> 00:58:45,700 Okay, my question is, I understand that we're using this as a plan to move forward for funding for the actual work itself. 672 00:58:46,320 --> 00:58:47,040 Is that correct? 673 00:58:47,040 --> 00:58:56,260 So with this it would there's gonna be more planning that comes with it so it honestly depends on what what type of funding comes out 674 00:58:56,260 --> 00:59:00,380 So sometimes funding comes out for actual projects 675 00:59:01,120 --> 00:59:09,760 If any of these conceptual designs, you know, that's further conversations with foresafe if they're all bored with those concepts that come up 676 00:59:09,760 --> 00:59:16,160 If there's opportunities to do that, you know, and foresafe for all bored then we would try you know the answer would be we would try 677 00:59:16,960 --> 00:59:21,440 sometimes the opportunities come in the form of actual plans and design. 678 00:59:22,380 --> 00:59:28,540 So this is more of a concept design to get to the point where you could go in and get to the 679 00:59:28,540 --> 00:59:33,400 point of having permits to actually go and do the work, usually need a site specific design. 680 00:59:34,080 --> 00:59:36,240 You need the power we actually got to do it. 681 00:59:36,400 --> 00:59:41,680 So is it the role as a March restoration, is it then layered disposal, and have to be able 682 00:59:41,680 --> 00:59:44,940 to document how you could get there to really just depends on the opportunity. 683 00:59:45,560 --> 00:59:59,100 Okay, so that brings you to my next question, and that is, I know that the people of B.T.A.M. West have been clamoring for this dread project to occur for many, many years. 684 01:00:00,000 --> 01:00:07,100 I'm moving forward. My question is, do we have a timeline for that? Is it dependent on what happens 685 01:00:07,100 --> 01:00:12,920 with popular point? Or is it just something that's going to happen at the end? 686 01:00:13,700 --> 01:00:20,080 So, the answer is right now with the timeline is popular points about the happen first. 687 01:00:20,640 --> 01:00:24,320 That's that silt. The time and show the picture of the shows that happened. 688 01:00:25,060 --> 01:00:27,460 That's how we go in. 689 01:00:27,720 --> 01:00:29,120 That's the resiliency part. 690 01:00:29,740 --> 01:00:34,800 The back end of what happens from there is further conversations with four sites. 691 01:00:35,040 --> 01:00:36,860 So a timeline on that, I can give you right now. 692 01:00:37,000 --> 01:00:39,280 Sharon, but the answer is we're going to continue to try. 693 01:00:40,380 --> 01:00:42,410 So is it this particular section? 694 01:00:42,960 --> 01:00:49,400 You know, maybe dependent on the funding and the funding comes through for the back end portion that we put in for. 695 01:00:49,900 --> 01:00:53,780 Or could it come in the form of working with DMP on the mud city side? 696 01:00:54,460 --> 01:00:59,920 There's also opportunities because DOP has the directing division to be able to work with them, 697 01:01:00,060 --> 01:01:01,780 which we have documented in the Brazilian staffer. 698 01:01:02,500 --> 01:01:06,160 You know, so how we get to whatever the next project will be, I don't know. 699 01:01:06,280 --> 01:01:08,620 You know, the answer is that I don't know right then second. 700 01:01:08,980 --> 01:01:14,920 But the answer is that we're going to continue to try to continue to open up the lagoon. 701 01:01:15,300 --> 01:01:17,400 It's got to work for everybody, right? 702 01:01:17,400 --> 01:01:18,760 So it's got to work. 703 01:01:18,760 --> 01:01:28,820 The other process that the township has right now is if individuals that live on in the Lagoon system if they wanted to choose to go out and 704 01:01:28,820 --> 01:01:31,440 Drench behind them, they can use the township permit. 705 01:01:31,940 --> 01:01:33,660 Well, the township permit has two spots. 706 01:01:33,860 --> 01:01:37,060 You can either take that material and tuck home turf farms. 707 01:01:37,600 --> 01:01:41,780 And they'll use the material to grow marsh grasses that they grow. 708 01:01:42,140 --> 01:01:47,080 But then you're talking about transportation costs to get it there to disposal peas all that. 709 01:01:47,080 --> 01:01:53,680 And then the other the other five is there's an area in eagles with that we have under a permit to be able to take that material there. 710 01:01:53,800 --> 01:01:57,940 Again, it's the same thing you have to be able to transport it and transport it responsibly. 711 01:01:58,000 --> 01:02:02,720 You can't just go out there and, you know, mug goes down the highway with it as you're going there. 712 01:02:03,160 --> 01:02:08,500 It has to be containerized tank, so those are all specialty items, so costs, you know, there's a cost to that. 713 01:02:09,560 --> 01:02:13,440 So that's an option that the residents have now to take action themselves. 714 01:02:13,860 --> 01:02:18,740 other than that, this is, that's why we did the study process in the beginning as to open up 715 01:02:18,740 --> 01:02:23,560 these opportunities to essentially go after much grant money as we can to try to fund it. 716 01:02:23,680 --> 01:02:26,940 Well, you know, I'm all for that, so that's it. 717 01:02:27,760 --> 01:02:33,940 I just want to add one other thought to that, which is that, you know, I think we understand 718 01:02:34,480 --> 01:02:39,180 that, you know, this is a planning process and it can be frustrating to hear the next thing 719 01:02:39,180 --> 01:02:41,820 is going to be another planner or another more detailed design. 720 01:02:43,480 --> 01:02:43,960 And 721 01:02:55,450 --> 01:02:57,770 I just want to talk about one example 722 01:02:57,770 --> 01:03:00,250 that our teams have worked on recently 723 01:03:00,990 --> 01:03:02,850 that shows that that process can work. 724 01:03:03,110 --> 01:03:04,110 It does take time, right? 725 01:03:04,110 --> 01:03:05,150 But it shows that that process can work. 726 01:03:05,850 --> 01:03:08,030 So Rambal and Kleinfeld are worked together 727 01:03:08,030 --> 01:03:10,810 with Long Beach Island, and as part 728 01:03:10,810 --> 01:03:13,750 of that Long Beach Township on a recent planning study. 729 01:03:14,290 --> 01:03:16,370 And one of the outcomes of that was a recommendation 730 01:03:16,370 --> 01:03:22,490 for, for, for design of a living shoreline at, at Long Beach Hunchips, D.P.W. facility. 731 01:03:24,050 --> 01:03:27,510 They, they were able to take the work that we did as part of Brazilian Long Beach Island. 732 01:03:28,430 --> 01:03:31,930 Get a grant from National Fish and Wildlife Foundation. 733 01:03:32,630 --> 01:03:35,930 National, it's the grant source is called the National Coastal Resilience Fund. 734 01:03:36,390 --> 01:03:39,650 And that grant was for full design and permitting. 735 01:03:40,070 --> 01:03:42,230 So it's not going to go to construction. 736 01:03:43,030 --> 01:03:48,370 However, if we have a national physician wildlife foundation, it's one of those funding sources 737 01:03:48,370 --> 01:03:53,850 where they like to give funding and increments, they want to get that planning and design 738 01:03:53,850 --> 01:03:56,170 done, and then they want to fund the construction, right? 739 01:03:56,170 --> 01:03:57,610 They don't want it to just stop there. 740 01:03:58,610 --> 01:04:03,790 So what Long Beach Township is doing is not just, hey, let's get this design in place, and then 741 01:04:03,790 --> 01:04:05,030 we'll move on to the next thing. 742 01:04:05,450 --> 01:04:10,010 The goal would be to go back to that funding source or another one and get the funds for the 743 01:04:10,010 --> 01:04:10,490 capital work. 744 01:04:10,490 --> 01:04:15,650 So I understand, right, it's another step in the process, it'd be great to just get all that 745 01:04:15,650 --> 01:04:21,130 capital funding all at once, and in some cases you can, that's done that, right, but this 746 01:04:21,130 --> 01:04:25,750 is one thing that we were able to do now, that in some cases you need that, you need that 747 01:04:25,750 --> 01:04:29,370 master plan in place, as Jim said, to get that next, that next source. 748 01:04:30,710 --> 01:04:33,150 I think that's important to put it out to the day. 749 01:04:33,250 --> 01:04:38,730 You have to remember, we're working with it's municipal government, it's county government, 750 01:04:38,730 --> 01:04:42,690 state governments, federal government, things take, unfortunately, things sometimes 751 01:04:42,690 --> 01:04:43,770 things take time. 752 01:04:44,410 --> 01:04:47,890 So, like to give an example, we have a county library that we worked with Ocean County 753 01:04:47,890 --> 01:04:48,350 government. 754 01:04:48,990 --> 01:04:53,570 That was a grant that I worked with the county to write that five years ago. 755 01:04:53,830 --> 01:04:56,110 And the library is not open yet, right? 756 01:04:56,110 --> 01:05:00,250 We're hopeful that it's going to open in the beginning of 2026. 757 01:05:00,850 --> 01:05:07,410 But if we don't work on the plans now, to give you an idea, we're close to $50 million 758 01:05:07,410 --> 01:05:09,670 or is a grant funding in six and a half years. 759 01:05:10,410 --> 01:05:15,970 So the thing is, if we didn't put the work in six and a half years ago, we might be zero. 760 01:05:16,850 --> 01:05:23,210 So if the idea is, is you keep working on it and keep looking for those opportunities. 761 01:05:24,050 --> 01:05:30,370 And especially when you are focused on whether it's consulting services that you're getting, 762 01:05:30,510 --> 01:05:35,330 or whether it's plans, or whether it's capital projects, you have to keep an eye out for those opportunities. 763 01:05:35,330 --> 01:05:41,590 So we've got really good connections that you see here tonight with us, but we've got really good staff 764 01:05:42,250 --> 01:05:46,130 that continue to look for those opportunities, and when they come up, the answer is 765 01:05:46,130 --> 01:05:51,250 is we're going to be prepared to do it, the P, Rambal, Climb Powder, and put us in that opportunity 766 01:05:51,250 --> 01:05:53,430 to be able to be ready to go after them. 767 01:05:53,990 --> 01:05:56,900 So any other questions? 768 01:05:59,260 --> 01:06:00,060 No questions? 769 01:06:00,940 --> 01:06:01,380 Yeah, go ahead. 770 01:06:03,160 --> 01:06:10,260 Yeah, here, you know, my question is really more from make a store for an environment. 771 01:06:11,940 --> 01:06:16,440 have you done these thin layer placements and been able to go back through to make sure 772 01:06:16,440 --> 01:06:21,720 that you haven't had like a invasive bright might and you've done these before? 773 01:06:26,180 --> 01:06:32,080 So for this one, I'm going to put one of our colleagues on the spot who's joining 774 01:06:32,080 --> 01:06:37,480 on the Zoom, who's going to college so Maggie, if you can make sure the mic is there and 775 01:06:37,480 --> 01:06:41,940 Well, that's great, and if you can, let me even help in a way in here. 776 01:06:44,450 --> 01:06:45,770 Brandon, do you hear that question? 777 01:06:46,290 --> 01:06:52,630 I did it in sound of like there was a question about controlling fragmites proliferation 778 01:06:52,630 --> 01:06:53,650 on the march. 779 01:06:54,470 --> 01:06:58,790 Well, it's specifically a precedent, for example, that's up to another place in other 780 01:06:58,790 --> 01:06:59,310 regions. 781 01:07:01,280 --> 01:07:02,180 Oh, I understand. 782 01:07:02,540 --> 01:07:08,760 So, I mean, as far as thin layer of placement examples, in other locations, make point 783 01:07:08,760 --> 01:07:14,420 out earlier, the example on the Bring Island project in New Jersey is a good example 784 01:07:14,420 --> 01:07:21,460 where Finlayer Placement was applied in Steve's sort of. 785 01:07:31,580 --> 01:07:39,400 The prime book reservation is another example of the comes to mind that was in Delaware, just down the coast. 786 01:07:40,440 --> 01:07:43,420 Avalon might have been another good example in New Jersey. 787 01:07:44,500 --> 01:07:59,340 But as Jim pointed out, these marshes are really sensitive to the elevation that you placed at the surface of that, particularly because of the species that survived there. 788 01:07:59,340 --> 01:08:11,460 Fragmites is one that really cannot put up with salt water and so by placing just enough 789 01:08:11,460 --> 01:08:20,750 sediment, elevate that marsh above the mean sea level or just below mean high water, 790 01:08:21,390 --> 01:08:23,790 we're able to control. 791 01:08:35,310 --> 01:08:39,750 A lot of what we've been speaking about, I would consider a lot of these 792 01:08:39,750 --> 01:08:41,210 almost first generation. 793 01:08:42,310 --> 01:08:47,230 Let me shorelines in nature based solutions and marshes believe it or not, has not been around 794 01:08:47,230 --> 01:08:53,250 as long as, say, maybe some of the freshwater or riverine systems that we've done inland. 795 01:08:53,910 --> 01:08:59,790 This is really, I'm not going to say it's brand new, but it's really still in its kind of impensive. 796 01:09:00,510 --> 01:09:04,950 These are a lot of these projects haven't been happening for more than like even ten years. 797 01:09:06,430 --> 01:09:13,350 Specifically, I can, if you like, downloading federal documents, there is a, the Corps of 798 01:09:13,350 --> 01:09:19,250 Engineer, Brandon Curtney, if I'm wrong, released a study called Guidelines of the 799 01:09:19,250 --> 01:09:24,230 then layer placement, and I want to say it was released in 2023, that's how new it is, but 800 01:09:24,230 --> 01:09:30,030 they actually went through some of the projects and kind of, well, lessons learned. 801 01:09:31,710 --> 01:09:33,070 Do I have that document right, Brandon? 802 01:09:33,070 --> 01:09:40,410 The correct, I have it here's the 20-23 guidelines for how to approach thin layer placement projects. 803 01:09:41,190 --> 01:09:42,710 That is an Army Corps document. 804 01:09:43,670 --> 01:09:52,950 They also, actually, published it through their engineering research and development group called ERTC, 805 01:09:52,950 --> 01:09:58,390 sorry, engineer research development center, and so they kind of handle all the technical 806 01:09:59,890 --> 01:10:04,770 maybe borderline academic elements. It's a PDF, maybe 200 page document, you can 807 01:10:04,770 --> 01:10:11,270 just download for free. If I could, I'll give it to you, but you shouldn't be hard, it shouldn't be hard to find. 808 01:10:11,330 --> 01:10:16,910 I mean, it is fairly technical, but I think it's a venture, this is something you find 809 01:10:17,590 --> 01:10:23,250 interstainer on a follow-up. It's certainly kind of our playbook, because like I said 810 01:10:23,250 --> 01:10:29,910 a lot of these things are new, and you don't know we see the effects of a project and restoration 811 01:10:29,910 --> 01:10:36,410 project in year one, or even year two. So what they are doing is monitoring these projects 812 01:10:36,410 --> 01:10:42,830 as multiple years, seeing exactly what you've pointed out like, is there an influx of invasive 813 01:10:43,630 --> 01:10:48,070 What's the settlement rate versus the accretion rate of some of these things? 814 01:10:48,670 --> 01:10:50,830 Are we just kind of like, 815 01:10:50,990 --> 01:10:54,150 Trading water, like if we're putting it in X amount of inches per year, 816 01:10:54,790 --> 01:10:59,670 Are we actually getting that accretion that we're looking for? 817 01:10:59,990 --> 01:11:02,530 So that's, they're really starting to, 818 01:11:02,550 --> 01:11:06,850 You know, we're getting feedback from real projects like Brandon just mentioned. 819 01:11:07,630 --> 01:11:10,350 Yeah, that doctor has a ton of examples. 820 01:11:11,370 --> 01:11:22,150 So, Louisiana has had some major, he has a bunch of temples along the eastern coast, it's a bit of a factory, you know, as you see some pictures. 821 01:11:26,220 --> 01:11:32,480 I would agree just from dual projects in the state, essentially you have to learn from each project that you do. 822 01:11:33,200 --> 01:11:37,940 So, there's things that don't get tweaked each time you do a project just based off to that information. 823 01:11:37,940 --> 01:11:43,940 And like Jim said, the monitoring is crucial because some projects are going to take better than others. 824 01:11:44,280 --> 01:11:48,720 You know, that monitoring portion would be able to go back to examples of what you had, you know, what we would do. 825 01:11:51,770 --> 01:11:52,530 Any other questions? 826 01:11:53,730 --> 01:11:56,050 I think just a last call for folks online. 827 01:11:56,250 --> 01:11:58,610 If you've got any questions, put them in the chat there. 828 01:11:59,070 --> 01:12:00,810 But in the meantime, any other questions here? 829 01:12:11,480 --> 01:12:15,840 All right. Well, thank you everyone. Again, you know, I'd like to thank DEP. 830 01:12:15,840 --> 01:12:20,720 Thank Ramball, thank the folks from Climphelter, they've done an excellent job, we appreciate it. 831 01:12:20,880 --> 01:12:28,640 Our next step from here is Jim mentioned is we'll get a deliverable back from DEP that I'll say this is the final document. 832 01:12:29,540 --> 01:12:33,680 And then typically what we'll see us do is we'll take it before our boards, our planning board, our zoning board. 833 01:12:33,920 --> 01:12:39,740 We'll take it before the governing body and adopt just like we did with the Zing and Stafford, and that'll be our plan. 834 01:12:39,740 --> 01:12:43,200 As Jim said, we've done a number of plans over the last six years. 835 01:12:43,580 --> 01:12:49,580 The idea is not only to give us a game plan for what we're doing going forward with different avenues, whether it's resiliency, 836 01:12:51,980 --> 01:12:59,360 or, you know, looking for these restoration projects, but also to help with our master plan as we go to update the townships master plan in the future. 837 01:13:00,060 --> 01:13:02,580 So, thank you for coming tonight. We appreciate it. 838 01:13:03,960 --> 01:13:04,700 Have a great night everyone.