[0:19] OK first up we have Eddy County [0:22] highway safety teamam leveraging [0:23] public private partnerships to [0:25] improve road safety. Josh Mac, [0:26] Chiefeddie countunty firere [0:28] Department Heather Brewer [0:30] government affairs consultant P [0:32] permian Strategic Partnership [0:33] and [0:34] as a reminder [0:36] you got 20 minutes [0:46] OK. he will be joining so Mr [0:47] chairir and members of the [0:50] committee Chief Eddie Chief [0:51] Josh mac from Eddy County will [0:53] be joining me shortly [0:55] virtually it is 9/11 and he is [0:56] involved with some [0:58] commemorations today. we will [1:00] make this as short and sweet [1:00] apologize [1:03] we have to take a moment of [1:05] silence in remembrance and thank [1:07] you for saying that if everyone [1:08] would please join me and stand [1:08] for a moment to s so [1:23] Thank you [1:30] Thank you Mr Chair [1:35] So to do a quick introduction. I [1:36] am here on behalf of the permian [1:38] Strategic Partnership where [1:40] nonprofit organization funded by [1:42] oil and gas companies as well as [1:45] two university systems in order [1:46] to invest in communities [1:47] impacted by oil and gas [1:49] development in southeast Mexico [1:51] and west Texas. so our [1:53] particular purpose in being here [1:54] as this committee is doing its [1:56] work is to give you an example [1:58] of a public private partnership [2:00] that is successfully underway [2:00] in southeast New Mexico. I [2:04] know it's not always easy to [2:05] find additional sources of [2:07] revenue for the programs that [2:09] you need to fund to make roadsa [2:11] across the state so we want to [2:12] make sure that you know that [2:13] industry is a partner and to [2:16] please call on us as you can and [2:17] they handout that you have in [2:18] front of us you have a list of [2:19] our membership which includes [2:21] newborn where your host this [2:25] morning and we also have a [2:26] list of other projects that we [2:28] have invested in. I won't go [2:30] through all of them this morning [2:30] but did want to highlight [2:31] that we [2:33] were just at New Mexico Junior [2:34] College yesterday where we're [2:36] proud to have funded the Cdl [2:37] training program that they have [2:39] there which includes scholarship [2:41] funding to allow members of the [2:43] community to get job training [2:45] and get safely on the highway [2:47] supporting industry and [2:49] hopefully some working fornMTOT [2:53] in the future and also [2:56] have some more highlights of [2:57] some of the programs that we [2:59] have been involved in but with [3:00] is Chief Mac [3:02] I can't see behind me. [3:08] oh excellent so without further [3:09] ado given the timeline, I will [3:12] kick us over to Chiefacc to [3:15] tellla you about a program that [3:17] we are beginning to fund in Eddy [3:18] County in order to make the [3:20] roads in southeast Mexico a [3:21] little bit safer we will happily [3:23] stand for questions both about [3:25] PSP public privatevate [3:27] partnerships or this program [3:28] whence the presentation is [3:28] concluded from the chief. [3:32] I will hand it over to you Chief [3:32] Mac. [3:36] morning Chairmandydy [3:41] Eddie County approached the [3:43] PP a couple of years ago to [3:46] start looking at resources that [3:47] we can bring into our area [3:50] to better serve the community [3:53] and the industry as we're [3:55] experiencing the rapid growth [3:57] one of the biggest things that [3:59] we were finding was delayed [4:01] response out to the remote [4:05] areas which was causing negative [4:07] outcomes, negative impacts [4:09] not only to the roadways but to [4:10] also the citizens of [4:13] Eddy County and those traveling [4:15] and visiting our area. so we [4:17] looked at the techstop program [4:20] that PSP partnered withex. on [4:21] and saw that they were offering [4:24] a roadside assistance support [4:26] program which we thought was [4:27] great but we thought we could [4:28] take it one step further [4:32] so what we've done is we've [4:34] brought in we're bringing in 6 [4:36] EMS specialist positions [4:38] specifically to staff an [4:40] ambulance that'll be remotely [4:43] placed out in the area off of128 [4:47] from US or New Mexico31 all the [4:48] way to the county line with Lee [4:51] County and they'll conduct a [4:52] random patrols throughout the [4:55] day. they'll do any roadway [4:57] debris removal. we plan to mark [4:58] the ambulances with some safety [5:01] messages just to remind drivers [5:02] slow down, don't text and drive [5:05] buckle up and hopefully having [5:07] the presence of the ambulance [5:09] out there will get attention to [5:11] slow down and practice [5:14] safely. However, if an emergency [5:16] does occur it also puts a [5:19] responder in the immediate area [5:21] where we usually average a35 [5:23] to55 minute response time we'll [5:26] be cutting that down. [5:27] obviously if they're in the [5:28] right place at the right time it [5:29] could be a matter of seconds to [5:32] minutes which changes the whole [5:37] dynamic of the situation and [5:38] then also the [5:41] ability to be out there to [5:42] coordinate [5:46] massive resources quickly based [5:47] off of actual evidence from the [5:51] scene. So without PSP I don't [5:52] know that this program would [5:55] have ever come to fruition. they [5:58] put $2 million up the county is [5:59] matched with1.7 and the [6:00] equipment [6:03] and I think it's a great [6:05] opportunity that we need to look [6:08] at and see how we can better [6:11] serve these working areas during [6:13] the high impact times and then [6:15] at night this crew will actually [6:17] go back into the village of [6:18] Loving and they'll staff from [6:19] there and provide additional EMS [6:21] support to our crews on a daily [6:22] basis [6:25] So Mr chairman and committee [6:27] members all stand with PSP for [6:28] any additional questions that [6:29] you may have. [6:33] with the presentation [6:38] we have truncated itm Chair to [6:41] meet your needs the brevity but [6:42] we're happy to answer any [6:42] questions [6:47] Mr Chair, thank you thank you. I [6:49] I cannot tell you how much this [6:50] means to us so appreciate [6:50] everyone involved. [6:54] thank you Mrirpresentative Brown [6:55] Representative Orego [6:58] thank you. [7:02] I we just came from visiting [7:05] what was the name of it [7:06] Milbourneillbourne [7:13] male born there we go. I said it [7:16] one of the things that struck [7:17] me when I was driving and and I [7:19] was talking to umpresentative [7:22] Brown about it is that there's [7:25] not a lot of housing out there [7:27] like there's a so there's a lot [7:28] of trips being made from [7:31] carlsbad to the sites and from [7:34] I guess Hobbs to the sites [7:37] but like there's no real place [7:38] for people to you know [7:42] be housed and I wondered if you [7:43] all have thought about [7:44] that sort of [7:47] future developments [7:50] for like workforce housing or [7:51] something like that absolutely [7:53] Mr Chairpresentativeerga, we [7:55] have looked at that issue in [7:57] fact when our organization was [7:59] founded six years ago it was one [8:01] of our key issues was looking at [8:03] affordable housing and how to [8:04] develop that in these [8:07] communities. what we did find as [8:09] a nonprofit organization was was [8:12] very difficult to help invest in [8:14] property development that didn't [8:15] leave us as property managers [8:17] which is not our area of [8:18] expertise and [8:21] so we have changed our area of [8:22] focus to no longer include [8:25] housing and but we are open to [8:27] conversations with local [8:28] governments to support the [8:30] projects that they are currently [8:31] engaged in and it is my [8:33] understanding as well that [8:34] the mayor of Hobbs and the city [8:37] of Hobbs have recently unveiled [8:39] some pretty exciting affordable [8:40] housing programs and that the [8:41] mayor of carlsbad also has some [8:43] very ambitious affordable [8:45] housing programs underway in [8:47] those cities so the issue is not [8:48] unnoticed [8:50] and certainly does contribute to [8:51] the commuters on the road and [8:54] the road safety issues what we [8:56] have found as an organization is [8:58] that the local governments are [8:59] the best equipped to support [9:01] that that we are at the ready [9:02] come bring us a project and [9:02] we'll look at it [9:05] thank you for that thank you Mr [9:07] Chair. I I just think that you [9:09] know it would be great to to [9:12] have less traffic on that road [9:14] that was one thing that I did [9:17] notice is that you know and [9:19] it would probably help with air [9:20] quality and a lot of other [9:23] things that besides traffic but [9:24] traffic is definitely a safety [9:24] issue there [9:26] so thank you [9:28] thank youpresentative. If I [9:30] could remind the members to be [9:31] as [9:33] concise in your questioning as [9:36] possible and if it can wait for [9:38] offline conversation I would [9:39] encourage you to do that as well [9:41] only because we're short on time [9:42] and some of us have engagements [9:43] in Albuquerque [9:46] so thank you members [9:49] senator [9:51] by shirt [9:58] thank you Mr Chairman thank you [9:59] M Brewer very much for for being [10:01] here great to visit. could you [10:03] refresh our memory with regards [10:04] to your organization for example [10:06] where is it housed is it virtual [10:09] and how many businesses and [10:10] local governments do you work [10:10] with? [10:14] thank you Mr Chair Mr vice chair [10:16] the organization itself is [10:17] physically housed in Midland, [10:19] Texas because it is the largest [10:22] city in the permian basin so the [10:23] area that we serve is the [10:25] permian basin on both sides of [10:27] the state line so the counties [10:29] in west Texas that comprise the [10:31] P permian basin as well as NH [10:33] Chavison Lee County in southeast [10:35] New Mexico. so unfortunately we [10:37] are not an organization that can [10:39] support the entire state but we [10:40] are an organization that is very [10:41] serious about rein [10:44] ve s ting in these counties in [10:45] order to make improvements [10:48] within the areas of [10:49] healthcare education, road [10:52] safety and workforce development [10:54] and we are our member [10:56] organizations are oil and gas [10:57] companies some of them are the [11:00] major players the the big [11:01] ones that we've all heard of as [11:03] well as smaller local companies [11:05] that support oil and gas here [11:08] we also have two university [11:09] systems they're both out of [11:10] Texas. that does not mean I am [11:11] not constantly [11:13] in conversation with the [11:15] University of New Mexico and at [11:16] some point these things may [11:18] change but each member [11:21] organization provides based on [11:23] their level of membership pay [11:26] into a buy into the organization [11:29] that allows us to bring that [11:30] money together and leverage it [11:32] for even larger investments and [11:35] so an example of what we do in [11:37] aggregating that money from [11:38] companies we were able to [11:40] invest10 million dollars in the [11:40] CTE school here in Hobbs [11:44] that10 million dollars combined [11:45] with money from the city and the [11:47] county as well as from other [11:51] funding partners allowed for the [11:53] entire facility to be built [11:55] and to be put in place and now [11:57] providing an excellent CT [11:59] resource for this part of the [12:00] state so those are the kinds of [12:02] things that we look into and [12:04] that is how we're funded we [12:06] certainly would encourage other [12:08] industries to consider [12:10] creating similar [12:10] organizations. Our CEO spends a [12:11] lot of time [12:13] traveling the country sharing [12:16] this model with other [12:17] organizations and other business [12:20] enterprises but part of the [12:21] reason we wanted to be here [12:22] today is to make sure everyone [12:24] knows that this is a model that [12:26] works that has been working for [12:30] six years and has led to [12:31] billions of dollars in [12:33] investment in the permian basin. [12:35] everything from paying for [12:36] teachers to get their national [12:38] board certification to funding [12:39] this great program that Chief [12:40] Mac is putting into place to [12:41] make sure [12:42] that when [12:45] an accident does happen on [12:47] highway128 that we can get [12:49] immediate services there or if [12:51] it's a minor incident in a flat [12:52] tire or something like that get [12:53] folks off the road and get them [12:55] safe quicker to keep our [12:57] communities functioning better [12:58] so we're looking for anything [12:59] and everything within our issue [13:00] areas that we can help support [13:03] ant as tic thank you and thanks [13:05] for your initiative and your [13:06] leadership in putting all this [13:08] together so I won't ask you [13:10] specifics but is it fair to say [13:10] there's policies [13:15] that work in one state better [13:17] than in the other state? Well, [13:19] Mr Chair Mr Vice chairir, I [13:20] would always say that the [13:21] policies in New Mexico are [13:24] better but that is because [13:26] it's my job to work for Psp on [13:29] the New Mexico side there is [13:31] always room for improvement and [13:33] further development with public [13:35] private partnership language [13:37] the capabilities is providing [13:39] clarification there so that we [13:40] can partner more directly with [13:41] more entities. what we [13:44] have found is that working with [13:46] local governments is one of [13:48] our most direct routes into [13:50] communities state government is [13:53] a little bit more cumbersome and [13:55] we do also work with nonprofit [13:57] organizations so as you are [13:59] considering legislation in [14:02] the regular session a [14:05] particulari to legislation that [14:06] supports public private [14:09] partnerships could help other [14:11] organizations including ours [14:12] engage [14:15] more directly but we could be a [14:18] unique or nontraditional partner [14:20] in your work to ident in this [14:21] committee's work to identify [14:23] funding resources and [14:25] opportunities for transportation [14:27] and road safety in the state [14:28] which has been a challenge over [14:30] the years. We cannot pay for a [14:33] mile of blacktop but we can [14:36] certainly invest in work zone [14:38] speed cameras and those kinds of [14:40] projects that can make a real [14:41] difference in saving lives in [14:42] the community and [14:43] among folks who are working on [14:44] our streets [14:47] thank you Mr Chairman. thank you [14:48] M Bre and then yeah I'll ask ask [14:49] you offline I've heard that [14:53] company that works with both [14:55] Texas DOT and New Mexico DOT [14:57] prefers to work with the Texas [14:58] Department of Transportation [14:59] even though it's a much larger [15:03] system apparently they're just [15:04] easier to work with but I'm sure [15:06] there's stuff that we do that [15:07] works best but there's stuff [15:09] that probablyex does that works [15:10] best and it'd be [15:13] it'd be beneficial for the [15:15] permian to ben to benefit from [15:17] those two policy choices but [15:18] anyway thank you Mr Chairman [15:18] thank you very much [15:20] thank you senator thank you [15:21] Msrewer for the presentation Mr [15:24] Mac if I could ask staff to make [15:26] sure that we have contact for [15:28] for these folks so that if they [15:31] wish to ask more questions or [15:32] engage somehow they can [15:35] do that thank you Mr chair and [15:36] members of the committee. I [15:37] appreciate the opportunity [15:44] next we have DOT district wo [15:46] engineer report fromcisco [15:46] Sanchez. [15:54] So like the other presenter you [15:57] have 20 minutes [16:04] mir fellow committee members [16:06] yes I'll get you 20 minutes even [16:07] though I love talking about DOT [16:09] so this is gonna be a a a a [16:11] tough task today definitely [16:15] an eventful agenda for you [16:16] for the committee and we're [16:17] really appreciate the committee [16:19] being tears being down here in [16:20] southeast New Mexico I'm [16:22] Francisco Sanchez I'm the [16:25] district two engineer for NNdlT [16:26] or C operations here in [16:28] southeast New Mexico so if you [16:29] want to turn to page two just [16:30] briefly [16:32] tell you about our district you [16:34] our primary counties we serve [16:37] arechavez, Lincoln Artero, Eddie [16:39] Lee, Rrosevelt urrie Debaca and [16:41] slight we barely touched [16:43] Guadalupe torrance's coral but [16:45] they are in our district but on [16:47] this page I want to highlight a [16:49] couple of things our district [16:51] as you can see is is southeast [16:53] New Mexico very diverse but we [16:54] are the largest district by [16:58] landmass and by lay miles7,700 [16:59] lane miles so that's every mile [17:02] of payment we have out there [17:05] it's if we went by center [17:06] lane miles down the center of [17:07] all these highways you know you [17:09] get3,500 lane miles as a state [17:12] we're at31,000 center lane [17:15] iles15,000 I was at a recent [17:16] conference [17:19] with the western association [17:22] of state you dont you dont Utah [17:25] DOT maintains5600 cider lane [17:29] miles. Arizona5600 we are almost [17:31] double the size of those states [17:33] and they're very comparable to [17:35] us if you go where it says [17:37] Fy27 budget we have a total [17:39] operating budget of52 million. [17:41] the two categories I want to [17:42] highlight is the ones that say [17:43] contract maintenance and fieldel [17:46] supplies so you roughly 8.1 and [17:46] and [17:51] 48 those are what we do the bulk [17:53] of our our maintenance so the [17:54] contract maintenance is the [17:56] contractors we hire and the [17:57] fuel supplies is what our staff [17:59] uses to maintain the roads where [18:01] there's the garra we put the [18:04] signs the salt we use and you [18:05] know with 8 million in contract [18:06] maintenance is not a lot you [18:07] know [18:10] a maintenance treatment can vary [18:13] from100,000 to500,000 a lane [18:15] mile so you know 8 million [18:16] doesn't really take us a long [18:18] way annually but if we've [18:20] been very grateful for the one [18:21] time funding we have been [18:23] getting through the house bills [18:25] right now currently at [18:27] district wo we employ325 [18:30] employees with 65 vacancies so [18:33] that's close to a 9/9 point [18:35] vacancy rate we have made [18:36] some tremendous changes [18:37] through our acting cabinet [18:37] secretary [18:41] and currently we have48 [18:43] positions in process either [18:45] advertising or ready to hire so [18:46] we'll see that go down [18:50] on page three page the following [18:55] pages3,4 and5 and6 those are the [18:57] summary of all the house bills [18:59] that have been passed since 2021 [19:01] House Billwo I won't go through [19:02] all of them you can see the list [19:03] but just want to highlight a few [19:07] you know in 2021 we we were we [19:08] were lucky enough to get the 21 [19:11] million for that US60 project [19:13] and this is for construction our [19:14] major project when we get [19:15] something like this even as a [19:16] one time funding [19:19] it really helps us fast track [19:21] and expedite these projects so [19:22] if we want to receive that 21 [19:24] million it sped up the [19:26] schedule by two years and so [19:28] that's very helpful as you go [19:28] through these [19:33] various years 90% of it is for [19:35] our contract or maintenance [19:37] processes so the majority of [19:38] these contracted jobs that you [19:41] don't see here see here we're [19:42] done by our maintenance [19:43] contractors we do have some [19:45] funds in here that win our [19:46] construction projects if you [19:48] drove the highway from roswell [19:50] to Tatum there was house bill [19:51] provided the design funding for [19:54] that and so that was a have [19:57] us able to design that a [19:58] portion of the house bills is [19:58] also in our construction [19:59] projects down in [20:01] ja il and and one in New [20:04] Mexico128 but of all the money [20:06] we've we've received we spent [20:09] over 90% of it the the remaining [20:10] is what's on those construction [20:10] projects [20:15] so if you go to page 6 you'll [20:17] see what was passed this year in [20:18] in HB2 [20:22] most of these are still in [20:23] progress or pending but that's [20:26] the list of the the150 million [20:28] that was passed each district [20:30] received20 million out of the [20:32] the bill and that's our list for [20:36] 2027 below is the map of all [20:38] the house bill funds as you can [20:40] see how it's been distributed [20:42] around District wo we try to be [20:42] equitable [20:45] to all communities all areas but [20:47] as you can see a lot of the [20:48] money is coming down here to the [20:50] southeast corner of the [20:51] southeast because that's [20:52] where the need is here in [20:53] district two [20:59] page se this is our active [21:04] construction projects over33 [21:05] million dollars worth of [21:07] projects we have several [21:11] large ones the74142 those are [21:12] the passing lanes that you see [21:14] out there if you drove in from [21:16] roswell we've recently [21:17] completed the first phase in [21:20] clovis1351 and we just [21:23] we bid or let we call [21:26] letting1352 last month so you'll [21:28] see that in construction so [21:30] those are you know large large [21:33] multimillion dollar projects and [21:35] so we've kind of transitioned in [21:37] the last10 years. The average [21:39] construction project in District [21:43] 2 or NM2 NMdlT was really7 to15 [21:45] million but the influx of [21:46] whether the bonds that you [21:48] passed or the additional [21:50] house bill funds our [21:50] construction program [21:53] is really focused on major [21:55] improvements with that comes [21:57] great great progress but some [22:00] challenges fornMDT we just [22:02] don't have as many projects at [22:04] one time for the district so [22:05] it's really been a challenge [22:06] with construction staff trying [22:08] to keep the workload spread [22:10] across the district but we were [22:12] able to supplement a lot of our [22:14] our rehab and payment projects [22:16] that would go to construction [22:17] now through the house bill going [22:18] through our contract maintenance [22:22] if you go to [22:28] page 8 of this is last year's fy [22:29] 26 completed contract [22:31] maintenance projects over14 [22:32] million [22:35] below that is this year's [22:36] contract maintenance and this is [22:37] a combination of the 8.1 that I [22:40] spoke about on page two and the [22:41] house bill funding that we [22:43] received this year so as you can [22:44] see [22:46] a lot of different treatments [22:49] a lot of different contractors [22:51] of course a lot of these are to [22:52] be determined but one thing [22:54] that's really helped us as a [22:57] state with the additional one [23:00] time appropriations is we as [23:02] engineers as the Dlt you you [23:04] know we want to keep our good [23:06] payments good and and that gives [23:08] us the best value for our money [23:09] and we haven't really been able [23:11] to do that but with this [23:12] additional money we're able to [23:13] do those treatments early on [23:16] when the highways510 years and [23:17] able to get [23:19] the cost value out of them for [23:21] the longest time we're just at [23:23] the end of life cycle trying to [23:25] hold on so this additional money [23:27] has really helped us and our [23:29] assets asset management program [23:30] that we're trying to really do [23:30] here in the state of New Mexico. [23:34] if you go to page nine this [23:36] is our four year state [23:37] transportation improvement [23:38] programme [23:40] of course this is the four years [23:43] of physic constraint projects [23:45] that are scheduled to be let. [23:47] it's our promise to the public [23:48] and we are to deliver in the [23:50] four years so this is our four [23:53] year st step in January we'll be [23:55] going to the next four years [23:57] but as you can see every year [23:59] we're over100 million in [24:00] projects a lot of it is our [24:02] federal funding but a a lot of [24:04] is part of the bonds that we [24:06] just passed recently this year [24:07] and in the s severance tax posit [24:08] pass [24:09] a couple of years ago [24:12] and so that's a four year st [24:12] step [24:18] if you go to page10 you have [24:20] the 2029 planning year so [24:21] anything in the planning years [24:24] will move into the next four [24:25] year cycle just want to [24:27] highlight that couple of those [24:29] of course is the top one is the [24:33] 210291 that's downtown Texaco [24:36] that's a $91 million project [24:36] that's going to be happening [24:38] we're partnering withex dot we [24:39] received a70 million dollars [24:42] grant from the railroaded [24:43] railroad grant to do that [24:44] project. [24:46] and and of course you'll see [24:48] some of the the additional [24:49] projects that we're trying to [24:53] continue on on that section and [24:54] then unfunded priorities [24:55] you know the number one priority [24:59] of district two is New Mexico128 [25:03] New Mexico31 and US380 and we [25:04] have construction projects and [25:06] all those corridors New [25:09] Mexico in 28 we have152 million [25:10] occurring right now or [25:13] 100 million now and52 million [25:15] next year but as you can see an [25:17] unfunded priorities we still [25:19] have sections on380 that needs [25:21] to be completed and we have [25:22] sections on128 that still need [25:24] to be needed and so in New [25:26] Mexico the way we build these [25:29] large large scale corridors is [25:31] in phases you know of course [25:33] it'd be it'd be wonderful to [25:35] get50 million to do all of New [25:39] Mexico128 but we understand [25:40] there's challenges there and so [25:41] we build them in phases [25:43] and the prior the way we're [25:45] prioritizing a US380 and New [25:49] Mexico128 is really where the [25:51] accident's happening so the [25:52] segments that you see out there [25:54] in380 those have the highest [25:56] crash rates in the same on on [25:59] New Mexico128 and of course we [26:00] have our major project in the [26:02] city of jail and that's really [26:03] for the congestion that goes [26:04] through there with the number of [26:05] trucks [26:09] on page11 this is this year's [26:11] this year's TPF for [26:13] transportation project funds [26:14] these are the communities that [26:14] were selected [26:18] very proud of this program [26:20] prior to this implement [26:21] implementation of the TPF [26:23] commuters would fight for [26:24] federal funding or federal [26:25] grants the district would [26:27] provide some of their internal [26:30] federal funding and it was very [26:32] competitive and you saw the same [26:34] community year in year out get [26:35] them and it was generally the [26:38] larger municipalities and so the [26:41] TPF is really changed it for [26:43] everybody across the state [26:44] especially New Mexan disstrict [26:44] two and I'm so proud of [26:47] this year's selections you can [26:49] see you got the Hagermans this [26:51] forummners theelroses tellula [26:55] rosa Ortero County it's just [26:56] communities you wouldn't see get [26:58] money so that program's been [27:00] such a benefit so thank you [27:01] for that and thank you for [27:02] passing the additional funds for [27:03] that program [27:09] so if you turn it page 12 this [27:11] is just a map of all the TPF [27:14] funding since 2023 as you can [27:17] see we've done a good job or the [27:18] community has done a good job of [27:19] working with our southeast [27:21] regional transportation [27:24] planninggan organization [27:26] coming coming forward getting [27:27] involved in the process as you [27:29] can see communities across [27:31] district who are actively in the [27:34] TPF program and we've awarded [27:34] across southeast New Mexico. [27:38] briefly just page13 [27:43] uh14 and1f that's our local [27:45] government road fund selections [27:48] for 27 as you can see it it's [27:51] quite similar to the TPf where [27:53] the funds are distributed to [27:54] communities across southeast New [27:55] Mexico. [28:01] so page six is the map of the [28:05] LGRf for 2026 and and we'll be [28:06] out in 2027 here shortly [28:10] and then finally we have [28:14] page17 equipment needs we're [28:15] desperately in need of of [28:16] equipment [28:16] of [28:19] if your most of you are probably [28:21] aware of the we had a horrible [28:23] snowstorm this year in in [28:24] southeastern Mexico especially [28:26] down in this area very icy [28:27] conditions the highways were [28:29] shut down for two or three days [28:31] just to put in perspective [28:33] our hospital patrol they [28:35] maintain about 800 miles of [28:36] highway here in this area [28:41] ive that's some snow loza and5 [28:43] for 800 miles so [28:47] a lot of challenges with that [28:49] you know it shuts down the area [28:50] so we're desperately need more [28:52] equipment and all these patrols [28:53] and this is kind of our list [28:55] that we we see the needs that we [28:58] can impact the communities [28:59] the best so that's our equipment [29:00] list for district 2. [29:02] Mr Chair [29:04] committee members, I stand for [29:05] questions [29:07] thank you first we [29:08] havepresentative Senna Cortez [29:11] thank you so much Mr Chair and [29:13] Mister Sanchez thank you for [29:15] your expertise and your very [29:16] thorough but succinct [29:19] presentation I do have a [29:22] question regarding highway 82 [29:25] from Levington to Artesia [29:27] there's like about a30 mile [29:28] radius you probably know better [29:31] than than I would do we have [29:32] any timeline on making that part [29:35] four lane as well Mr Chair [29:37] Representative it was it is [29:38] listed in the unfunded priority [29:41] I should have highlighted [29:45] that so we are under not [29:46] under contract yet but we've [29:49] gone out to RFP for the design [29:51] and so we want to get the plans [29:53] in place and then seek funding [29:54] but right now that portion [29:56] between Levington and where the [29:58] improvements finish andaljabar [30:00] that area local hills is [30:00] unfunded representative [30:03] Mr Chair and Mr Sanchez do you [30:06] know a potential timeline on [30:08] getting it funded [30:11] Mr Chairpresentative that's a [30:13] tough question but the way we're [30:14] progressing it'll eventually be [30:16] in this in our four year stip [30:19] but you're probably looking at [30:21] least another5 years before he [30:23] gets in our our st step unless [30:25] we get some type of [30:26] funding for it [30:30] thank you so much Mr Chair and [30:31] Mr Sanchez we know how to [30:32] advocate I know that's a road [30:33] that I travel on my way to Santa [30:34] Fe and I have a lot of other [30:35] constituents that when they [30:37] travel they go to and it's a [30:39] tough it's a dangerous road [30:41] especially with oil filled [30:43] traffic and so there are times [30:44] where I'm just like I'm gonna go [30:45] the other way because it's safer [30:49] but it's longer so well it [30:51] shows me where to advocate so [30:52] thank you so much Mr Cha and Mr [30:52] Sanchezreci you. [30:56] thank youpresentative Nex we [30:56] have Senatorco [31:02] thank you Mr. Chairman Francisco [31:03] what is [31:05] in your [31:10] 15 and10 year plans what is the [31:10] need [31:15] so Mr chair senatorco [31:18] of course there's a lot of needs [31:21] but number one is we have to [31:24] continue with our our major [31:25] improvements on the on the [31:27] highways this big projects right [31:29] these these corridors for them [31:30] to really function at the level [31:32] we need and the safety we need [31:33] they need to be fully completed. [31:35] So number one is is finishing [31:37] these major corridors [31:40] number two is [31:43] the continuation of improvement [31:45] in our funding with maintenance [31:46] so that's the biggest that's [31:49] the biggest one our payment [31:53] rehabilitation that is truly [31:54] what's truly needed throughout [31:55] the state [31:58] Well I'm looking through looking [31:59] through here looks like you're [32:00] spending [32:03] about130 million dollars a year [32:04] and [32:05] district two is that [32:09] plus or minus plus or m Mr chair [32:11] there yes plus or minus ok I [32:14] guess so what I was getting at I [32:17] see over here on your unfunded [32:18] priority projects there's a [32:20] there's a half a billion dollars [32:21] in that [32:23] in that paragraph [32:24] so [32:27] you know we heard yesterday [32:29] that we [32:34] with respect to states [32:34] supported local [32:38] revenues where some5.7 [32:41] billion dollars underwater [32:43] could you describe [32:46] in this report [32:49] that that's really what I was [32:51] trying to get at is we're [32:54] spending131132 million dollars a [32:55] year [33:00] that does not appear to be [33:01] given [33:05] the unfunded [33:09] paragraphs that does not appear [33:10] to be sufficient [33:14] could you describe for the [33:14] committee how [33:16] in dollars if you will [33:21] and compare that to the5.7b that [33:22] we heard [33:23] yesterday [33:26] how how far are we behind [33:30] in total [33:35] Mr Chairsenator a total in [33:38] district 2strict strict we're [33:38] about [33:43] 500 it varies you know [33:45] everybodydy evaluates a little [33:47] bit different you know by [33:49] evaluations's about500 million a [33:51] year that should be their number [33:53] to catch up our previous [33:55] district engineer his analysis [33:58] was about a billion and so [33:59] I'll go probably a billion [34:01] dollars behind in in district [34:02] two that where we need to catch [34:03] up senator [34:06] and I I know that I'm asking you [34:07] to [34:12] for data beyond your district [34:12] but are [34:17] other districts in the state in [34:19] similar circumstances, Mister [34:22] Chair senator we are you know [34:22] you go [34:25] throughout the state and you can [34:27] drive every road every district [34:29] and we're all behind we see [34:31] it in our data you know we have [34:33] a very robust project payment [34:35] management system it it gives [34:38] you our pavement rating it shows [34:41] our deterioration and we're very [34:43] comparable to every district [34:45] we're all behind and we all have [34:46] that kind of need or that number [34:46] in each district [34:56] Welcome to the committee [35:01] I am so glad I'm not on this [35:03] committee [35:10] francisco Mr Chairman Francisco, [35:11] I consider roads [35:15] to be one of the primary [35:16] responsibilities of state [35:17] government [35:20] and [35:23] apparently at every level [35:29] we are woefully neglecting the [35:30] needs [35:33] highways impact commerce [35:35] a s [35:37] they impact [35:40] accident statistics they [35:47] they they're just something we [35:48] need to do a better job looking [35:49] after [35:54] and I feel your pain because it [35:58] looks to me like well 621 I [36:00] didn't even see 62,180 on this [36:02] list and it's already [36:07] in need of some serious rehab [36:08] because those [36:13] 3 by3 yard patches are showing [36:14] up regularly [36:26] Guess that's all I have thank [36:29] you sir and thank you Mr Chair [36:30] thank you senator.ext we [36:31] havepresentative Brown [36:33] you Mr Chairman [36:36] good to see you Francisco. [36:39] always a pleasure to work with [36:40] you on projects and [36:43] you guys do all the work I just [36:45] get to make a phone call here [36:47] and there but I want to start [36:49] with the equipment needs for the [36:51] district. I think every year [36:52] since I've been on this [36:54] committee Mr Chairman, I have [36:56] advocated that we invest more [36:57] money and equipment not just for [36:59] this district but for all of [37:01] them because we never come even [37:03] close to doing that so Mr Chair [37:05] I just wish we could make a note [37:08] that maybe in the 2020 session [37:10] we can do a much better job of [37:10] meeting the equipment need [37:13] s it is to some extent a safety [37:15] and efficiency issue to have [37:17] that equipment so I just think [37:18] this needs to be the year with [37:20] the extra revenue that we're [37:23] going to see we can do it if [37:25] we have the will to so I'll just [37:27] mention that I did want to ask [37:30] you Francisco Mr Chairman [37:34] about the Georgehoper leaf [37:36] route and I'm I'm kind of [37:38] making a little note for you [37:39] here and I've talked to you [37:41] in the past that the geometry it [37:44] goes Georgehooperlii route to [37:48] highway 285 very odd little [37:50] geometry to that curve and I [37:52] know there's an a cell lane now [37:54] but it's still an issue for us [37:55] and I just want to let you know [37:57] that the city ofarlsbad is [38:00] looking at is in talks about [38:00] some oil [38:04] and gas work that and maybe even [38:05] some housing that will happen [38:07] there and there may be an [38:10] opportunity to fix that they [38:11] want to have a side road and [38:12] maybe [38:14] so are you familiar? have you [38:16] had any discussions uhm Chair [38:19] Francisco Mrir Representative [38:21] Brown, yes we are in we are in [38:22] discussions with the city of [38:24] carlsbad some of the private [38:24] developers [38:26] and [38:30] of course the main discussion is [38:32] with the city of carlsbad they [38:33] want to access for their housing [38:35] development they're they're in [38:37] the process of acquiring500 [38:40] acres acres from BLm and so [38:42] that's gonna be a huge impact to [38:43] the George superper leaf [38:45] routeurrently that is a whip [38:47] restricted route what we call a [38:48] access control [38:49] and so [38:52] there's a process to break that [38:53] so we're going to work with the [38:54] city of carlsbad [38:56] there's some developers oil and [38:59] gas are wanting to partner in [39:01] determine that use that same [39:04] axis so during the process of [39:05] working with the developers and [39:07] the city of carlsbad [39:10] once we are in favor of [39:11] district two but theres a [39:12] process that will have to go to [39:13] the front of a committee and [39:15] part of that process of the [39:17] evaluation of the impact of that [39:19] development whether it's the [39:20] housing or the drilling [39:24] or the other mix use parcels [39:25] they want to put out there and [39:28] part of that acts as approval [39:29] will be working with the city [39:32] cars carlsba to come up with a a [39:33] master plan for all the safety [39:35] improvements whether it's [39:37] further down the George [39:41] Shuett 28562 and80 and anything [39:43] related to that axis brake where [39:45] there's perhaps a traffic signal [39:47] or major intersix improvements [39:48] where they're going to access [39:49] off of Georgeute. [39:52] yeah Mr Chair I'm glad to hear [39:54] that. I think a cooper [39:57] cooperative effort would really [39:58] it'd be a win for a lot of [40:00] people including just about [40:02] everybody really there so thank [40:04] you. I also want to bring up [40:06] Highway128 this project's been [40:10] on the drawing board for a long [40:11] time and and work is moving [40:12] forward but it just seems I [40:14] think I read this in thehobbs [40:15] newspaper that there is a [40:18] and this is down at that little [40:22] intersection there um3.1 miles [40:23] but the work won't be done until [40:27] 2028 is that accurate? I know [40:28] you're doing what signal curbing [40:33] turn lanes drainage of course [40:37] just give us a s and why it's [40:38] taking so long [40:40] Mr Chairpresentative Brown the [40:41] toughest projects that we face [40:43] indlT is is our what we call our [40:46] urban and so through the city of [40:47] ja those3.2 [40:51] you know we're basically [40:52] rebuilding the highway there and [40:55] the the highway prism we're [40:56] extending it a major [40:59] timeline there is really the [41:02] storm drain system there's a [41:04] storm drain system that goes in [41:06] will be going in that community [41:09] for for of course the the [41:10] drainage and that takes a lot of [41:12] time to lay the the storm drain [41:14] in there so that's a majority of [41:15] that second [41:18] just handling the traffic we [41:19] really have to build in small [41:22] phases through those miles just [41:23] the sheer number of trucks and [41:26] trying to control that so very [41:26] limited on the way [41:29] we maintain traffic and that [41:30] adds tremendous delay to our [41:31] construction projects [41:34] well it [41:37] it is a critical point in our [41:39] transportation system for sure [41:40] so we look forward to that [41:41] getting done and then Mr Chair I [41:43] just want to kind of close with [41:45] a comment we drove our [41:47] shuttle bus today committee did [41:51] to oil and gas location [41:53] and we took 62,180 [41:57] anyway it and we've had a [41:58] discussion and there it was I [42:00] guess a concrete kind of like a [42:01] test plot it didn't hold up [42:05] and I had constituents telling [42:06] me it was a really dangerous [42:09] section of the drive and I [42:11] spoke with you and you did [42:13] exactly what I asked you to do. [42:15] maybe you're gonna do it [42:17] already but put up a slowdown [42:20] sign and reduce the speed [42:21] limit and you actually looks [42:23] like did some asphalt patching [42:25] in places there so I just [42:26] want to say thank you for doing [42:28] that. I know it's on the [42:30] schedule to work that stretch [42:31] and I guess make it asphalt [42:32] instead of [42:35] concrete but thank you for [42:37] being so responsive and I look [42:38] forward to that project being [42:40] done too eventually [42:42] Mr Chairre represent thank you [42:43] that those are some of the [42:45] challenges that we we face we [42:47] don't that was unexpected you [42:48] know that concrete was supposed [42:50] to last a lot longer and now [42:51] you're introducing a30 million [42:53] dollars project that we're [42:55] trying to now prioritize with [42:57] all the other needs but that is [42:59] desperately needed and will [43:01] continue to maintain it until we [43:02] go into construction [43:03] next year to replace that [43:05] concrete. very good thank you [43:06] for the answers thank you Mr [43:06] chairir. [43:09] youpresentative [43:10] Representativeorrego [43:13] thank you Mr Chair. thank you [43:17] Mr Sanchez francisco, do you [43:19] mind if I call you that? [43:21] so I was looking at the [43:23] boundaries I was looking on your [43:25] map and I had to actually pull [43:29] up the DOT boundaries so [43:30] traveling [43:33] to get to this location I came [43:37] on I-40 and I I think that your [43:41] district includes I-40, going [43:43] east is that right Mr Chair [43:45] Representative, we we do not [43:46] I-40 is not within our [43:48] boundaries you're right on the [43:49] on the cusp of map on the cusp [43:50] yes [43:53] ok I was just going to mention [43:55] Mr Chair how much truck traffic [43:57] was on that road when I was [44:01] coming east to get to you [44:03] know cut across to stancia [44:05] and I didn't know if that was in [44:08] your district or not so that is [44:11] in what district? Mr [44:12] Chairpresentative that be [44:17] districtive or45 or4 the I-40 [44:19] you know on the east side of to [44:20] be district four and then [44:24] itstancier district cuts into [44:24] district [44:27] well I just wanted to mention [44:30] the amount of semi trucks [44:31] that I saw [44:35] just I40 and I know that some of [44:39] that we we actually because of [44:41] our trade port our trade ports [44:42] I think that I mean [44:46] I don't know how we can increase [44:47] that traffic but it's not in [44:48] your district but I'm sure you [44:49] talked to the other district [44:52] engineers so I just wanted to [44:53] mention that Mr thank [44:55] youpresentative you for the work [44:57] you do you guys always do a [44:59] great job. I mean DlT does a [45:00] great job with what you have to [45:02] work with so appreciate you [45:02] thank you [45:07] thank youpresentative. we don't [45:08] have any further questions thank [45:08] you for the presentation. [45:13] Next up we have aviation [45:16] division andndustry update we [45:19] havejesselitz owden, Bob Hudson, [45:22] Jody Young, Corey Needham, [45:24] ToddRandall, Bobby Thompson [45:26] that's a whole bunch of folks [45:27] but you're still limited to 20 [45:30] minutes we understand thank you [45:32] we were asked to present a panel [45:35] today so we brought that we [45:37] have shortened that our [45:38] fellow presenters are going to [45:39] shorten their little updates on [45:42] their airports for you so [45:46] good afternoon Mr chair and [45:47] members of the committee. thank [45:49] you for the opportunity to be [45:51] here today. I am [45:52] Jessselitzraden, director of the [45:54] New Mexico Aviation Division and [45:55] I would like to spend a few [45:57] minutes giving you a snapshot of [45:59] the work that is happening [46:00] across the division [46:03] I'm going to focus primarily on [46:05] two significant investments our [46:07] rural airer enhancement [46:09] programme, also known as rays [46:12] and the55 million dollar fiscal [46:15] year 24hB2 investment in airport [46:16] infrastructure. [46:18] Then I'd like to spend just a [46:19] couple of minutes looking [46:22] forward because I believe that [46:24] New Mexico has a tremendous [46:25] opportunity in advanced [46:27] aviation, unmanned aircraft [46:28] systems and emerging aviation [46:29] technologies. [46:32] oh we don't have the slides up. [46:33] I'm so sorry I wasn't sure what [46:35] was going on before behind me. [46:37] OK so the second slide there the [46:40] aviation division supports [46:41] airports and communities [46:42] throughout New Mexico. [46:45] Our role goes well beyond simply [46:47] administering grants. We work [46:49] directly with airport sponsors [46:51] on safety compliance, capital [46:52] planning and project delivery. [46:54] We coordinate closely with the [46:56] FfaA, local governments and [46:58] industry partners and we [47:00] administer the rural airer [47:01] enhancement orRa programme [47:04] our priorities are fairly [47:04] straightforward [47:08] t ect the infrastructure that we [47:08] already have [47:11] improved connectivity for our [47:14] rural New Mexicans help our [47:16] airports succeed and make sure [47:17] we are preparing our aviation [47:18] system for what comes next. [47:21] that combination of [47:23] infrastructure and connectivity [47:24] is really the theme that I would [47:24] like to keep in mind today. [47:25] Next slide [47:30] one of the clearest examples of [47:31] connectivity is the ray [47:33] programme.A was first created [47:35] during the 2021 legislative [47:37] session to help rural New Mexico [47:39] communities establish airirer [47:41] connections to regional and [47:42] national hubs. [47:45] for a rural community commercial [47:47] air service is much more than [47:50] convenience. it means access. it [47:51] gives businesses access to [47:53] customers and markets. It [47:55] supports tourism. it helps [47:57] employers recruit and retain [47:59] employees. It provides residents [48:01] with better access to medical [48:04] care education and family and it [48:05] connects to rural New Mexico to [48:06] the larger national [48:07] transportation system. [48:11] for fiscal year 27 alone, the [48:13] state is investing18.5 million [48:15] dollars through race but I think [48:17] it's important to put that [48:19] number into perspective since [48:21] fiscal year 22, the legislature [48:23] has invested79 million dollars [48:25] in rural airer throughout this [48:26] program. [48:27] Slide4 [48:32] the79 million dollars over ix [48:34] fiscal years dedicated [48:35] specifically to improving air [48:37] service and connectivity for [48:38] rural New Mexico. [48:40] that level of investment [48:43] demonstrates that rural airer [48:44] has become an important part of [48:46] the state's transportation [48:48] strategy. It also means that we [48:49] have a responsibility to make [48:51] sure those dollars are producing [48:53] results that's why the aviation [48:55] division has continued to [48:56] strengthen the race program [48:59] around local participation, [49:01] measurable performance and long [49:03] term route sustainability. The [49:05] goal is not to subsidize an [49:07] airplane it's to build a market [49:08] we want to give [49:11] passengers and communities the [49:12] opportunity to establish [49:13] service, build passenger demand [49:15] and ultimately create a route [49:16] that becomes increasingly [49:16] sustainable over time. [49:19] as the state's investment in [49:21] race has grown we believe that [49:24] accountability and performance [49:24] have to grow with it. [49:25] slide ive [49:29] the other side of the equation [49:31] is infrastructure we can create [49:33] connectivity through programs [49:35] like race but those services [49:36] depend on having safe and [49:37] capable airports underneath [49:40] them. The legislature's fiscal [49:43] year $2455 million HB2 [49:45] investment gave the aviation [49:47] division an extraordinary [49:48] opportunity to address airport [49:50] infrastructure needs throughout [49:50] New Mexico. [49:54] this was a one time two year [49:56] capital investment and those [49:59] dollars have been committed to74 [50:00] projects statewide [50:03] sefo projects from one [50:05] appropriation is significant. [50:07] The unique thing that we were [50:09] able to do in most of these [50:10] cases that we're generally not [50:12] able to do is to fund them from [50:13] start to completion. [50:16] These projects are addressing [50:19] pavement taxiways facilities, [50:21] safety equipment firefighting [50:22] capabilities signage, [50:24] operational improvements and [50:25] other critical infrastructure [50:27] without this influx of capital [50:29] investment, many of these would [50:32] be waiting for more than5 years [50:34] or more for potential funding [50:35] and these aren't simply [50:37] investments for people who fly [50:38] recreationally. [50:41] Our airports support emergency [50:43] medical transportation, aerial [50:45] firefighting law enforcement, [50:48] military operations tourism, [50:51] business development and access [50:52] to rural communities. [50:55] in many parts of New Mexico the [50:57] airport is every bit as much of [50:59] a piece of essential [51:01] transportation infrastructure as [51:02] the highway that's coming into [51:02] town. [51:03] slide 6 [51:07] I'd like to give you a few [51:09] examples of what the55 million [51:10] dollars looks like when it [51:12] actually reaches a community. [51:14] The first isRoswell Air Center [51:17] where HB2 provided just over $9 [51:19] million to address projects that [51:20] had been proposed in their [51:22] airport layout plans that [51:24] funding was used to extend [51:26] Taxiway Charlie which helped [51:27] them prepare for hosting the [51:30] roswell airir races, but another [51:31] part of that investment has an [51:33] important public safety [51:34] component. Toxiwaylima was [51:34] constructed [51:38] to allow firefighting aircraft [51:40] to safely access their slurry [51:43] loading pads so in one project [51:45] we're supporting an economic and [51:47] tourism op opportunity while [51:49] also improving infrastructure [51:50] that supports wildland [51:50] firefighting response. [51:53] at Sierra Blanca Regional [51:56] Airport in Riidoso, HB2 provided [51:57] approximately3.97 million [51:58] dollars. [52:01] That investment included [52:03] parallel taxiway ravo increasing [52:05] operational safety at an airport [52:07] where the crosswind runway [52:09] provides the FfaA required [52:10] crosswind coverage [52:13] that may sound highly technical [52:14] but the practical result is [52:17] simple safer aircraft movement [52:19] and better airport operations [52:21] here in Hobbsley County Regional [52:23] Airport, we invested1.8 million [52:26] dollars. Those dollars supported [52:27] an aircraft rescue and [52:29] firefighting truck along with [52:30] signage and wayfinding points [52:34] Anarf truck is not a glamorous [52:36] piece of infrastructure but is [52:37] it exactly the kind of [52:39] investment that directly [52:41] improves airport safety and [52:42] emergency response capabilities. [52:46] and at clovis Regional Airport, [52:49] the state invested just over4 [52:50] million dollars for a new [52:52] terminal. Now that project is a [52:53] very different one but an [52:56] equally important one.erminal [52:58] infrastructure ins affects the [53:00] passenger experience. the [53:02] community's ability to support [53:04] commercial air service and [53:05] ultimately the impression that [53:07] visitors of and businesses have [53:09] when they arrive in that [53:11] community. These four projects [53:12] represent only a small portion [53:13] of the sefo projects funded [53:17] throughhB2 but they demonstrate [53:18] the breadth of the investment [53:21] we're addressing safety we're [53:23] improving operations we're [53:25] supporting emergency response or [53:27] modernizing facilities and we're [53:28] helping communities position [53:31] their airports for economic [53:32] opportunities [53:32] slide se [53:36] and this is where rays andhB2 [53:38] come together. They are [53:39] different programs but they're [53:41] really two pieces of the same [53:44] statewide aviation strategy.Ra [53:45] connects rural communities to [53:47] the broader air transportation [53:49] system while infrastructure [53:51] investments like HB2 product and [53:53] improve the airports that make [53:54] those connections possible. [53:55] and increasingly those [53:57] infrastructure investments can [53:59] also help prepare our airports [54:02] for emerging technologies and [54:05] new aviation opportunities so [54:06] while we're investing in the [54:07] aviation system New Mexico needs [54:10] today we also have to think [54:11] about the system that we're [54:12] going to need tomorrow. [54:14] flight 8 [54:17] and this is where I believe New [54:19] Mexico has an opportunity that [54:20] is much bigger than the aviation [54:20] division. [54:24] when we talk about advanced air [54:26] mobility UAs autonomous systems [54:28] and emerging aviation [54:30] technology. New Mexico already [54:31] possesses something that other [54:33] states are spending enormous [54:34] amounts of money trying to [54:35] create which is an ecosystem [54:38] We have white sands missile [54:39] range with an extraordinary [54:42] concentration on defense testing [54:45] controlled airspace and advanced [54:47] technology operations. We have [54:49] NMSU and it's physicalsciences [54:51] lab including an FfaA approved [54:53] UAS test site and [54:57] approximately15,000 square miles [54:59] of coordinated airspace for [55:00] available for UAS operations. [55:03] we have New Mexicotech [55:06] conducting unmanned aircraft [55:07] testing at Plius and research [55:09] involving autonomous systems. We [55:11] have Spaceport America advancing [55:13] public space travel and we have [55:15] public use airports across the [55:17] state that can provide rural and [55:19] remote opportunity or and I'm [55:21] sorry remote operating [55:23] environments that can support [55:26] testing demonstration and [55:28] eventually deployment that's a [55:30] combination that very few states [55:30] can replicate [55:33] the question for us is how do we [55:35] turn these individual assets [55:37] into a coordinated competitive [55:38] advantage for New Mexico. [55:41] because I don't want New Mexico [55:42] simply to be the place where [55:44] somebody comes tests their [55:45] technology, packs it up and [55:47] leaves we should be thinking [55:48] bigger than that. [55:49] slide 9 [55:53] the real opportunity is to [55:54] create a pipeline. [55:57] Research here test here then [55:59] integrate and demonstrate the [56:02] technology here and when that [56:03] technology becomes commercially [56:05] viable we want those companies [56:07] to build it here we want them to [56:10] locate here and we want them to [56:10] employ new Mexicans [56:13] that creates opportunities in [56:15] engineering manufacturing, [56:17] aviation operations maintenance [56:19] data cybersecurity and an [56:21] entirely new aviation supply [56:22] chain. [56:25] the role of the aviation [56:26] division has is not to own all [56:27] of that we are to be a [56:29] connector. We can connect our [56:31] airports to our universities we [56:33] can connect our federal partners [56:35] and defense partners with the [56:37] communities we can help identify [56:39] infrastructure that can support [56:42] testing and demonstration and we [56:43] can work with economic [56:44] development and private [56:45] industries so that when [56:47] companies are looking for a [56:49] place to develop and deploy the [56:50] next generation of aviation [56:51] technology. New Mexico was part [56:52] of that conversation [56:55] so if there is one thing I'd [56:56] like the committee to take away [56:58] today. it is that aviation [56:59] investment in New Mexico isn't [57:00] one dimensional. [57:02] next slide please slide10. [57:05] we are investing in [57:07] connectivity. Over the past six [57:09] physical years New Mexico has [57:10] committed79 million to that [57:12] rural air service enhancement [57:13] program. we're investing in [57:15] infrastructure the fiscal year [57:18] $2455 million appropriation [57:21] supported74 airport projects [57:23] across the state and now we have [57:25] an opportunity to leverage [57:26] connectivity and that [57:28] infrastructure are def our [57:30] defense assets our universities [57:32] and our research capabilities to [57:33] invest in something else. [57:36] innovation and economic [57:37] opportunity. Our job at the [57:39] aviation division is to help [57:41] connect those pieces to protect [57:43] the system we have today while [57:45] preparing for New Mexico for [57:47] where aviation is going next and [57:48] to learn more I'd like to invite [57:49] all of you to join us on [57:53] February se7 of2027 for aviation [57:55] and aerospace dayy at the [57:57] legislature. Thank you Mr Chair [57:58] and members of the committee. I [57:59] appreciate your continued [58:01] investment in aviation across [58:02] New Mexico and I'm happy to [58:02] answer any [58:04] questions. [58:08] thank you for your presentation [58:10] it's really enlightening I I [58:11] remember coming onto the [58:14] committee and I was surprised I [58:16] never would have dawned on me [58:17] that aviation was part of TOT [58:19] but it does make sense when you [58:21] really think about it so thank [58:22] you for the informationppreciate [58:24] you resentative I meansenator [58:24] maestas [58:27] thank you know folks have to hit [58:28] the road but thank you so much [58:30] Director the refresh our [58:33] memories the the house to with [58:34] the55 million dollars that was [58:35] what year [58:39] Mrir senator that was in [58:40] twenty4. [58:41] fiscal year 24 [58:45] fiscal year fiscal so that was [58:46] in the [58:47] session [58:48] and [58:52] and that55 million has [58:52] already been [58:55] spent appropriate I'm sorrymir [58:57] senator yes that was a two [59:00] yearur appropriation and it was [59:01] officially ended in July of this [59:02] year. [59:05] and the and the and essentially [59:07] all the money was spent the [59:09] spent we had a bit remaining and [59:11] that bit that was remaining Mr [59:14] Chair and senator was because of [59:16] projects that either were [59:17] delayed because of lack of [59:21] contractors availability or they [59:22] were delayed due to their city [59:24] procurement processes because [59:26] this was a very short turnaround [59:28] with it only two years to get [59:31] that appropriation spent some of [59:32] the processes within those [59:32] communities take [59:34] quite a bit longer particularly [59:36] our tribal communities. Thank [59:37] you, Mister Chairman Director [59:38] the [59:39] so let's figure out [59:43] between now and Christmas or so [59:45] what what the capacity would be [59:47] now to spend money within a two [59:49] year period cause I think it's [59:50] probably time for another for [59:53] another round the so these [59:54] these were essentially public [59:56] works projects infrastructure [59:58] projects understood awesome [59:59] thank you so much thank you [1:00:00] director. Thank you [1:00:04] thank you we have three more [1:00:06] speakers and I think we have a [1:00:08] couple on Zoom am I correct and [1:00:10] I will ask that they be very [1:00:10] very brief [1:00:14] first we have Mr Bob Hudson, [1:00:16] manager Moriorty municipal [1:00:18] Airport president New Mexico [1:00:20] airport Manager association. Mr [1:00:20] Hudson, are you [1:00:21] there [1:00:28] Yes, I am and thank you Mr Chair [1:00:30] for this opportunity to speak as [1:00:31] the president of the airport [1:00:32] managers association I [1:00:37] link up with quite a few [1:00:39] city leaders around the state of [1:00:41] the5foub use airports we have [1:00:42] and I will tell you this that [1:00:42] since [1:00:48] uhjesse owon came in the airport [1:00:51] system has been very well it's [1:00:54] not100% but it's a lot better [1:00:56] than it's been in the past. The [1:00:57] problem we face as airport [1:00:58] managers is a lot of the [1:01:02] city leaders and city [1:01:04] councils don't really appreciate [1:01:06] or understand the value of the [1:01:07] airports. I'm constantly being [1:01:10] pressed by city leaders saying [1:01:11] that their airport brings [1:01:13] nothing to their city and [1:01:14] unfortunately they don't [1:01:15] understand the effect of the [1:01:17] gross receipts taxes the effect [1:01:19] of the publicity with with those [1:01:22] airports they are very robust. [1:01:24] Take Moriority for example right [1:01:25] now we have a company here at [1:01:27] Moriarty called Sky which is [1:01:28] about to explode you're about to [1:01:29] hear a lot about sky [1:01:31] as as they [1:01:35] as they as they grow and the [1:01:36] money they're bringing to the [1:01:38] stancia alley and Moriorty [1:01:41] issues they're building a device [1:01:42] that looks very much like a [1:01:42] durgible [1:01:45] it goes airborne will be [1:01:47] airborne for a long periods of [1:01:48] time they just flew one out [1:01:51] ofRoswell to Japan and back to [1:01:52] Moriorty [1:01:55] this is just gonna increase a [1:01:56] huge amount of income [1:01:58] to the valley more and [1:01:59] tomoriority and that's just one [1:02:01] of the small things airports can [1:02:04] do for cities. The last thing I [1:02:05] want to talk about is the55 [1:02:08] million. they're a programs and [1:02:11] and materials that the [1:02:13] Moriarty missile airport has [1:02:14] been asking for for years the [1:02:15] state did not have the money to [1:02:17] give us the federal government [1:02:20] did not prioritize these needs [1:02:21] high enough but with the55 [1:02:22] million dollars [1:02:25] after 13 years I was finally [1:02:27] able to acquire materials to [1:02:31] keep my airport nice looking and [1:02:32] safe and I really appreciate the [1:02:35] help that the legislator did and [1:02:37] I'll give this over to the next [1:02:39] speaker but thank you. thank you [1:02:41] so much Mr Hudson. Next we have [1:02:43] Mr Jody Young administrator [1:02:45] Donana County International [1:02:46] Airport. are you there [1:02:48] Mr Young [1:02:52] Yes sir, I am Mister chairir [1:02:53] and committee members, I [1:02:54] appreciate this opportunity as [1:02:55] well. [1:02:57] as mentioned, if you're [1:02:59] not familiar we are located in [1:03:00] the southern part of the state [1:03:03] appreciate the representative [1:03:05] that brought up the New Mexico [1:03:06] trade port. I think we're a [1:03:07] significant arm of that and that [1:03:10] is a a big thing that that [1:03:11] between the industrial park here [1:03:13] in Santa Teresa and Las [1:03:15] cruces and the role that we play [1:03:16] here withwataz and the [1:03:18] crossborder trade is [1:03:20] significant and I think [1:03:21] Jessse hit on a lot of things [1:03:22] that are important I'm on the [1:03:23] board of directors with Bob and [1:03:27] the money that helps us not only [1:03:29] with the the public support [1:03:31] piece of this the the [1:03:33] maintenance you know for me [1:03:34] personally down here at this at [1:03:36] the jet port we are exploding [1:03:40] the amount of industrial growth [1:03:42] that is happening here which for [1:03:43] the jet port again it brings [1:03:46] corporate aircraft it brings [1:03:47] customers and people flying [1:03:49] through here routinely to do the [1:03:51] crossborder trade mission and [1:03:53] to to meet the needs of their [1:03:56] customers and of the the [1:03:58] businesses alike we've exploded [1:03:59] along with our hanger use and [1:04:00] we've gotten a tremendous amount [1:04:03] of support in the growth I think [1:04:05] but there's always room for us [1:04:06] to go back and work we have a [1:04:09] the the upkeep maintenance as [1:04:10] was mentioned the pavement [1:04:12] rehabilitation just like with [1:04:14] our road systems we have the [1:04:16] same thing here on our taxiways [1:04:17] and continuing to support the [1:04:18] you know us it will [1:04:21] you know allow us to continue to [1:04:23] move forward, support the trade, [1:04:24] support the crossborder trade [1:04:27] see the fruition of the cargo [1:04:28] operations here in the southern [1:04:30] part of the state and just [1:04:31] appreciate anything that we can [1:04:32] get and and the support that [1:04:34] y'all have given to the aviation [1:04:34] community. Thank you. [1:04:37] thank you Mr Young. Needham [1:04:39] yes, so [1:04:42] really I think everything's been [1:04:43] echoed by the previous [1:04:46] presenters and so in respect [1:04:48] for your time, I'll just answer [1:04:49] any questions that you may have [1:04:50] related to our three airports [1:04:51] here in Lee County if you have [1:04:52] any. [1:04:55] I don't think we have any [1:04:57] questions but thank you and of [1:04:59] course if if members do think of [1:05:01] something later we'll make sure [1:05:02] that staff provides contact [1:05:03] information for everyone. [1:05:07] thank you so much signal for the [1:05:08] business here are these books [1:05:08] here [1:05:09] or no [1:05:12] we're adjourned [1:05:16] thank you