[26:44] out where 10 acre tracts pieces [26:45] of property where you want to [26:48] put your well that goes to [26:50] public notice and once that goes [26:51] to public notice that's kind of [26:54] a legally binding document that [26:56] says you have a 10 acre track [26:59] here that you're legally able to [27:00] put a well. So now the well [27:03] driller goes in they put in the [27:04] permit number and they say [27:06] here's a latitude longitude that [27:08] I want to drill a well for this [27:10] permit. we checked to see if [27:11] that is in the same [27:12] location as where you went to [27:14] notice if it's not we tell the [27:16] well driller there needs to be [27:18] an amendment on this permit and [27:19] it needs to go back out to [27:20] notice generally [27:25] for one more follow up on that [27:28] if we're specifying a 10 acre [27:29] block [27:30] and they don't feel like there's [27:31] water in that 10 acre block. [27:34] before they drilled it so we had [27:36] to totally start over if we're [27:38] going to move over to an [27:39] adjacent 10 acres if you [27:40] specifically said that 10 acre [27:43] tract that is correct. You can [27:44] fill out your application that [27:45] says hey you know [27:46] I have [27:51] 2000 acres. I don't know where I [27:52] want to put my well. I want to [27:55] go to notice on my whole block [27:57] of land and that would bypass [27:58] that and you would allow you'd [28:00] have to notify more people but [28:01] that would allow you to put it [28:02] wherever you wanted to you're [28:03] welcome [28:14] we have again we have domestic [28:18] wells again if you're putting in [28:20] a a pub a irrigation or [28:21] public water supply well there's [28:23] well spacing for each aquifer [28:26] that you are required to be set [28:27] back from and that's generally [28:30] 1320 acre feet for groundwater [28:34] wells and660 feet for alluvium [28:37] wells so if you come in and [28:39] drill a well and you have a [28:40] house that's next door and it's [28:44] within500 feet you have a right [28:46] to kind of to protest that and [28:48] make sure that the irrigation or [28:50] public water supply well or [28:51] whatever well is outside that [28:51] well spacing [28:58] Any other questions [29:06] Again this is an example of what [29:08] we kind of get is this accurate? [29:10] is there overuse going on we [29:11] don't know there's insufficient [29:13] data and this shows a permit [29:17] for213.3 acre feet per year and [29:19] they've written in I think [29:20] 181,82 acre feet [29:24] is that gallons did they really [29:26] mean acre feet this is for Stint [29:28] Louisuttility Company. Does [29:30] anyone know where the small town [29:32] of Saint Louis is I don't think [29:33] that they used 181,000 acre feet [29:37] so we do get these and [29:39] historically we just haven't had [29:40] time to you know give Stint [29:41] Louis a call and say are you [29:41] really using this amount? [29:44] I think over the next couple of [29:47] years we're going to have an [29:48] online water use reporting [29:50] database and that's going to [29:52] catch a lot of these errors so [29:54] if you were to ask me how much [29:56] water use we used in2025 [30:00] uhpresentative Newton has asked [30:01] us that you know several times [30:02] we'd pull the data out of our [30:04] database and we'd hand it to [30:07] them and it might be 181,000 [30:09] acre feet off if we didn't catch [30:11] that so when we pull that data [30:12] we go and look for some of the [30:13] things that are a little [30:15] outrageous but there's there's [30:17] definitely a lot of error in the [30:18] amount of water that's reported [30:24] Groundwater use in Oklahoma this [30:26] is a graph dating back to 20 or [30:31] the year2000 through2024 and the [30:32] thing that I would like to point [30:35] out here is in about2010 to2011 [30:37] we started having an increase in [30:38] the amount of water use [30:40] reported. We also had an [30:42] increase of the amount of [30:43] permits that were being applied [30:46] for and it was because of the [30:47] drought and if you look at those [30:49] numbers we had about a50% [30:50] increase in the amount of water [30:51] use that was [30:53] reported so we've had a lot an [30:55] influx of people when drought [30:56] happens there's a water [30:58] scarcity. I don't know if I have [31:02] enough water I need to permit [31:04] some more of my land to increase [31:05] the amount of water I can use. [31:10] w017 was the most water we've [31:12] had groundwater we've had [31:16] reported I think2025 is right [31:18] now reporting a little bit more [31:20] than 1.2 million acre feet [31:21] so2025 might be the highest [31:24] amount of groundwater use [31:26] reported and as you can see [31:28] irrigation is the number one [31:30] user of groundwater followed by [31:31] public water supply. [31:38] for example as some comparisons [31:40] the ogallala panhandle 1.2 [31:43] million allocated we get [31:46] about500,000 acre feet reported [31:48] Ogallala northwest that's [31:51] theogallala not in the panhandle [31:53] of Ogloma and there's [31:54] interest in the imron River [31:57] alluvium terrace aquifer again [31:59] allocated versus reported about [32:02] a quarter of that is used [32:02] statewide in Oklahoma [32:06] 42 million acre feet is [32:10] allocated 1.2 million is [32:12] reported and for comparison [32:14] because I know a lot of us don't [32:16] think in a re feet Oklahoma City [32:19] uses about 1540 acre feet this [32:22] is in2025 Oklahoma City only [32:24] uses surface water. this was [32:25] just for a comparison [32:26] so [32:28] Oklahoma City uses a lot of [32:29] water [32:32] it's kind of comparable to some [32:33] of these aquifers [32:36] the city of Enid is the largest [32:38] groundwater user in the state of [32:40] Oklahoma 93,000 acre feet [32:42] allocated they report 18 about [32:43] 18 1000 acre feet [32:50] this is a slide showing how much [32:52] water use is reported per [32:54] aquifer the couple of numbers [32:55] that I want to focus on are the [32:58] top three on the left that's the [33:01] ogallala rush springs and [33:03] theakkota sandstone is below the [33:04] ogallala out in the panhandle. [33:06] those are the top three [33:08] groundwater aquifers that are [33:10] used and the number one alluvium [33:12] terra aquifer and that's just [33:15] the sand deposits of the rivers [33:17] the number one is the imarron [33:17] river allu [33:20] vi terraaquiver those are the [33:21] four highest used aquifers in [33:21] the state of Oklahoma. [33:26] these are a couple of [33:30] diagrams maps of theogallala [33:32] aquifer the top one is the [33:36] percent depletion that's the [33:38] percentage of groundwater that's [33:40] been depleted compared to [33:42] predevelopment when we start to [33:44] have a a lot of center pivots [33:48] going in in the 1950s the purple [33:50] and red are where saturated [33:53] thicknesses over50% depleted [33:56] it might also be locations where [33:57] there's not much saturated [33:58] thickness [33:58] and then the bottom [34:02] and what I mean by saturated [34:06] thickness is you have an aquifer [34:09] that might be this thick and [34:10] you saturated thickness may only [34:14] be the bottom75% and so that's [34:15] what I mean by saturated [34:18] thickness. The bottom figure of [34:20] the ogallala and the panhandle [34:24] basically shows are an [34:26] estimate of how many years [34:29] until that portion of the [34:30] aquifer is depleted and this is [34:32] based off of some back of the [34:34] envelope calculations that we [34:36] did assuming you had a70 feet of [34:38] saturated thickness and we're [34:42] pumping at or could pump at250 [34:43] gallons a minute and those [34:45] are very minimum amounts so as [34:46] you can see theres some portions [34:48] of the aquifer that there's not [34:52] as much saturation to be able [34:53] to continue pumping [34:55] anything over green is what [34:57] we're estimating over 100 years [34:58] left in the Ogolana aquifer. [35:06] this [35:11] at current pumping rates and [35:13] declines actually it's at [35:14] current declines of water use [35:20] or at at current saturated at [35:22] current saturated thickness [35:25] pumping at current rates and [35:26] showing those current declines [35:29] that's how many years that we [35:32] anticipate or or estimating [35:34] at this time we have a contract [35:35] with the US Geological Survey at [35:38] the moment to update our equal [35:40] proportionate share maximum [35:41] yield calculations and as part [35:42] of that groundwater model [35:44] they'll be doing some estimates [35:46] very similar to this but this is [35:47] a kind of preliminary [35:49] numbers just to say hey this is [35:49] kind of what we're looking at [35:54] and then this is the permits [35:55] that map with the permits [35:58] overlaid on top of that and it [35:59] kind of shows where the aquifer [35:59] is being used [36:02] I believe in Texas County and [36:03] the north [36:06] west portion of that where we [36:06] see some of the quote [36:09] insufficient saturation or0 to20 [36:12] feet of years remaining we see a [36:13] lot of permits out there so that [36:14] that's an area we probably need [36:16] to start might be an area of [36:17] concern [36:24] to go out there and collect a [36:26] little bit more data or talk [36:28] with the landowners and ask is [36:29] this kind of what you're seeing [36:32] so again this is a kind of [36:34] our preliminary map to say hey [36:36] this is kind of what's going on [36:38] you don't know what's going [36:39] on unless you look [36:44] and then this is a movie of [36:45] depletion of the okkullala [36:47] panhandle aquifer from 1981 [36:51] showing the rates of decline the [36:54] yellow is 30 to40 feet we start [36:56] seeing reds60 to 80 ft of [36:57] decline 80 to100 with the [37:02] purple and over 100 ft with [37:03] that deep red [37:04] again [37:12] that was only through the2020s [37:12] and this only starts in 1981 [37:16] you can go on the web and find [37:20] articles dating back to 19811982 [37:21] that say hey what are we going [37:22] to do with the ogallala it's [37:24] already declining at rates [37:25] that are pretty quick [37:28] and specifically in Oklahoma [37:30] some of those articles so we [37:32] already had declines in Oklahoma [37:35] this just shows hey from 81 [37:38] to2022 I think it was we're [37:40] seeing in some areas that have [37:42] had 1100 ft over 100 ft of [37:42] decline [37:48] Rush springs is another aquifer [37:50] that we have a little bit of [37:52] concern about Caddo County as I [37:53] mentioned was the fourth largest [37:57] county where we have groundwater [38:00] use the the top left graph there [38:02] is a particular well that shows [38:04] data dating back into the 1940s [38:08] and that well has lost about540 [38:10] to50 feet of saturated thickness [38:12] and [38:16] that well on this map isn't [38:18] even in the area where we see [38:19] the largest declines [38:28] and between2005 and2020 in [38:29] catttlell County that's almost [38:32] about 2 ft of average decline in [38:33] that aquifer [38:34] now in the state of Oklahoma we [38:35] don't [38:39] consider the surface water [38:42] groundwater interaction and [38:43] but it [38:45] exists [38:45] and [38:50] fort Cobbreservoir relies a lot [38:52] on groundwater that seeps out [38:55] into the springs and streams and [38:57] so that reservoir relies on that [39:00] groundwater to keep it full and [39:02] so the you know fort Cobbmaster [39:05] Conservancy is interested in [39:07] understanding you know if we [39:08] have continued declines in the [39:10] rush springs aquifer what effect [39:12] does that have on that reservoir [39:14] and their ability to provide [39:15] drinking water to the public [39:20] gar ver Wellington is another [39:21] aquifer it's over central [39:23] Oklahoma Oklahoma City gets [39:24] their water from surface water [39:28] a lot of the communities around [39:30] Oklama City get their water from [39:33] groundwater and the figure on [39:36] the right is showing basically a [39:38] subtraction between two datasets [39:39] that we have and it shows in [39:42] some areas between 1987 and2009 [39:46] we had up to 30 ft of loss of [39:48] that thickness of that aquifer [39:50] and so there are some areas that [39:51] might be a little bit more [39:52] concerned down at the moreore [39:55] and Norman area. I know the city [39:55] of Mustang also has [39:59] wells in that dark red area and [40:01] that's shown declines between [40:04] those two time frames the top [40:06] graph again is a well [40:08] neareddmmon that's showing [40:12] about40 feet drop 35.9 ft of [40:13] drop in twenty5 years [40:14] again [40:18] not to be alarming but this is [40:19] what kind of some of the data is [40:22] showing and for us just to know [40:22] this is what's kind of going on [40:23] in some of these aquifers [40:27] ga in Northork of the edriver [40:29] this also is kind of a [40:32] controversial area we have lurid [40:34] altus that's downstream the the [40:37] or down gradient that provides [40:39] water for the luridaltus [40:42] irrigation district and they [40:44] have some concern on groundwater [40:46] that's being used upstream [40:50] and it's ability to provide [40:53] any water to that reservoir. So [40:53] what happens is we have [40:57] rainfall some of that soaks into [40:59] the ground some of it runs off [41:01] the reservoir captures what's [41:02] runs off. there's some of that [41:04] water that soaks in and leaks [41:07] out and that's what they're kind [41:08] of concerned with so they're [41:09] interested in knowing how much [41:10] of that groundwater that seeps [41:14] out fills in that aquifer and [41:16] so from2015 to2025 in the north [41:18] fork of the red there's just one [41:20] well in particular there that we [41:22] pulled up some data that top [41:23] figure shows about 16 ft of [41:23] drawdown for an a [41:26] qui f er that's probably not too [41:30] thick in that area. maybe 100 [41:31] ft in that area [41:34] some of these alluvium teris [41:37] aquifers are really thin 30 ft [41:39] of of thickness is all some of [41:41] them have a little bit more 100 [41:44] to120 feet of thickness. rush [41:46] springs is about 30 ft [41:48] thick on average that's a [41:50] bedrock aquifer garber [41:51] wellington maybe average 3 to500 [41:51] feet [41:54] question [42:01] you're recognized thank you Mr [42:03] Chair you talked about that [42:05] Altaslake that irrigation [42:07] district and then the people up [42:09] above it do is do you feel [42:11] there's a correlation with you [42:12] know the lake is it hurting the [42:14] people up above or the people up [42:15] above hurting the lake do you [42:18] do you see a correlation between [42:19] the two [42:22] I think any any drop of water [42:24] you take out of a system is [42:26] going to affect that system to a [42:28] certain extent and I think there [42:29] needs to be a little bit more [42:30] let's look at this a little bit [42:33] more if this is a concern you [42:35] know if I take a drink out of a [42:38] cup of water my son's cup of [42:39] water he might get aggravated at [42:40] me cause that's one less drink [42:42] that he would have or if it's a [42:43] coke for sure he would get [42:44] aggravated at me but do think [42:48] that if there are any drop of [42:49] water that's taken out does have [42:49] an effect on the [42:52] system so I think it's something [42:53] that we would need to look at a [42:53] little bit more. [42:56] is that a good kind of waffling [42:57] on the fence answer for you [43:02] this is a long term water level [43:03] responses in some of these [43:04] aquifers. What I really want to [43:06] point out here is it's really [43:08] kind of it's hard to read but [43:10] the gray areas on each one of [43:11] these graphs going left to right [43:13] and they start about 1900 and [43:14] the water levels kind of kick up [43:16] whether in the fiftiess or60s [43:18] and these are just kind of [43:19] average water levels but what I [43:21] want to show on this graph is [43:22] like a little gray areas that [43:25] are going from the top to [43:28] bottom are are drought periods [43:29] and when we go into a drought [43:29] these [43:32] aquifers definitely respond they [43:35] the water is either being taken [43:36] out and not replenished through [43:38] rainfall or some of it's leaking [43:42] out into the creeks providing [43:43] base flow but there's def [43:44] there's a correlation between [43:46] some of our droughts and the [43:47] water levels in the aquifer [43:52] so that's kind of the current [43:54] conditions at the water board is [43:56] sc specifically and water rights [43:57] what we what we're looking at [44:00] what I want to do is talk about [44:02] how we're restoring core [44:04] capacity if there's any [44:06] questions or what I've kind of [44:08] presented as I go through the [44:10] rest of this presentation feel [44:11] free to ask [44:15] Over the last 2 to 4 years we've [44:17] gotten an influx of some [44:20] appropriations to help [44:21] restore some of our core [44:22] capacity we've talked about this [44:23] Julie's talked about it at the [44:26] governor's water conference and [44:28] we've been able to hire just a [44:30] little bit more staff in [44:32] the2010s we had again I [44:34] mentioned we had budget cuts we [44:35] closed all of our offices [44:37] positions weren't rehired we had [44:38] about6 people running our [44:39] permitting [44:42] permitting department [44:46] what we've done over the last [44:48] five years is we've adjusted [44:49] some of our outdated fee [44:51] structures and then we requested [44:54] those appropriations that [44:56] representative Newton has a [44:59] championed at least for [45:01] groundwater and groundwater [45:02] compliance. so we've been [45:04] addressing a backlog of [45:06] applications basic housekeeping [45:07] things like that [45:10] and of course there's Julie at [45:12] our governor's our conference [45:14] who was probably giving that [45:15] that talk right there we need to [45:15] restore core capacity [45:19] She came into my office as we [45:20] were going over that and it's [45:22] like you're not going to use [45:24] that so this graph shows [45:28] basically the number of staff [45:29] that we've had for our [45:31] permitting and as you can see [45:36] there throughout2019 to2021,22 [45:39] we only had about5 or6 staff and [45:42] through some of those raising [45:43] fees we look at other states [45:46] what are other states doing if [45:47] they're they're raising their [45:47] rates we're kind of kind of [45:48] going [45:49] into [45:52] seeing how much time permitting [45:54] process takes how much of what [45:55] that cost is we're looking at [45:57] what other states are doing and [46:00] we're adjusting those fee rates [46:03] for a permit application based [46:06] off of those numbers so we've in [46:08] adjusted that fee rates we've [46:09] gotten the additional [46:10] appropriations and we'll be able [46:13] to hire staff to even you know [46:14] you don't know what you have in [46:16] the cupboard unless you look so [46:17] that's basically what it is [46:23] and [46:24] if you look at the bottom [46:28] graph2025 that gray number is [46:30] the total number of permit [46:31] applications that we were able [46:34] to process in2025 it corresponds [46:36] to the number of staff we've [46:39] been able to increase. if you [46:42] look back to201w2ish area you [46:45] also see high number there [46:47] and but it's a lower amount of [46:50] permits I think we were in kind [46:51] of that phase of we got to get [46:51] these [46:52] permits out we got to get these [46:54] permits out we got to get these [46:56] permits out and we missed a lot [46:58] of things there are probably a [46:59] lot of issues with a lot of [47:01] permits that were issued back [47:04] around that time and so that's [47:05] some of the housekeeping that we [47:08] kind of need to look at. So for [47:09] instance if you got a permit [47:12] in2012 and you come back and [47:13] oops we forgot to put this well [47:14] on your in your [47:20] notice public notice packet [47:20] well when you do your amendment [47:23] we put that well in that notice [47:24] if you're coming back to add [47:26] more water to your to your well [47:27] so some of those housekeeping [47:27] things [47:30] What I'd like to point out is [47:32] one of the things that we were [47:34] told is that the water board [47:34] takes so long to get these [47:37] permits out and while that is [47:40] true it's this interplay of [47:42] you're applying for a water ride [47:44] you just send in a piece of mail [47:48] and it goes at the bottom of the [47:49] stack and we work down [47:54] and or an email and we get [47:56] there we work on your permit we [47:57] send you hey this is kind of [47:58] wrong can you make these [48:00] corrections? you put it down on [48:01] your desk it sits there for two [48:02] months and he's oh I've got a a [48:05] I've got to fill that out and [48:06] you send it back to us it goes [48:07] back to the bottom of the list [48:10] and what we started doing after [48:12] talking with the state of Texas [48:14] I know sorry we got an idea from [48:16] Texas but anyway they said hey [48:19] if you sit down with your with [48:20] your people who want permits it [48:22] helps out with that process a [48:23] lot more. who would have thought [48:24] if you actually sat down with [48:26] somebody right? So when you [48:28] apply for a permit we highly [48:30] recommend you come in and sit [48:32] down with us and what we found [48:34] is that knocks off about 3 [48:34] months off of that process time [48:38] and so if you come in and sit [48:40] down with us we help you fill it [48:41] out it's basically ready to go. [48:44] Our permanit specialist they see [48:46] that face to face connection and [48:47] they say oh Josh I really like [48:49] you know we had such a great [48:50] time filling out your [48:51] application. I'm gonna go finish [48:53] it out right now goes through [48:54] the process he gets his notice [48:56] packets you know relatively [48:58] quickly versus someone that's [49:01] sends in those packets and it it [49:04] might wait but the amount of [49:05] time that these permits have [49:08] taken if you have an appointment [49:10] with us it usually knocks about [49:10] three months off of that [49:11] process. [49:14] and that's just data from [49:17] late2023 through2025 we started [49:17] keeping track of that [49:22] the number of complaints we get, [49:25] you know previous to about 2020 [49:26] there was one guy you know on [49:28] the phone he'd be on the phone [49:31] he'd write it down and if he got [49:32] out in the field to check it out [49:36] who knows but as we started [49:38] getting a little bit of that [49:40] core capacity back we're able to [49:44] hire an additional person and we [49:45] can actually go out and [49:48] investigate these complaints is [49:49] this well too close? Is there [49:51] too much pumping going on? [49:53] what's the issue here?2 people [49:54] fighting I think we had a [49:58] complaint about two folks out in [50:00] the panhandle and one of them [50:02] said meet me at the stockyards [50:04] and we'll finish this out and [50:05] sure enough they met at the [50:07] stockyards and had a fistfight [50:08] and the well driller was sitting [50:10] there. what am I supposed to do? [50:11] they're on the phone with us [50:13] take photos I mean I don't I [50:13] don't know [50:17] so these issues are there's more [50:20] issues that are rising people [50:22] are starting to rely on us a [50:23] little bit more to help them [50:26] figure out a lot of these [50:26] complaints and water issues [50:30] I'd mentioned we have a well [50:32] drillers program that the well [50:34] drillers are now required to [50:37] submit a intent to drill for [50:38] anything that requires a permit [50:41] not for domestic use. this is an [50:43] example on the bottom of what [50:46] we're seeing out there there's a [50:48] hole or cavity that's opened up [50:50] and you can see some cement [50:52] around that well. Well that [50:54] cement is supposed to be 10 to20 [50:55] feet depending on the [50:56] circumstance and that well [50:57] driller just put in maybe foot [51:01] and something bad happened to [51:01] this [51:04] that program was established in [51:05] 1973 [51:11] and our well drillers go out [51:12] and they inspect some of these [51:13] wells [51:18] through those budget cuts we [51:21] were down to about two staff and [51:22] they didn't have enough time to [51:24] go out and do well inspections. [51:28] so here's a graph showing the [51:30] number of well inspections we [51:32] hired some folks in late2024 and [51:34] we've been able to increase our [51:36] well inspections visiting [51:37] with those [51:40] well drillers making those [51:42] connections and our [51:46] those people's names are getting [51:48] out there our staff so they know [51:50] oh Jason's coming out or [51:51] Charlie's coming out or whatever [51:54] and so it's just getting a lot [51:55] more field presence over the [51:57] last couple of years with those [51:59] slight increases in [51:59] appropriations [52:04] Neil I got I do have a question [52:06] from vice chairir west and just [52:08] a couple of pages back we're [52:09] gonna try to catch them as we go [52:09] if you don't mind. [52:12] thank you Mr Chairman. [52:16] go [52:16] a couple of questions [52:22] the field offices that what what [52:23] was their job [52:27] so the field offices we'd have [52:30] you know a couple of guys [52:32] Kim was Kim Suivan was his name [52:35] or Hank you know down in the law [52:38] in office and if you had you [52:38] know permit questions you [52:40] wouldn't have to drive all the [52:42] way to Oklahoma City and they [52:43] may even know you by name. we [52:45] had those present that presence [52:48] out there for years for decades [52:50] and so their job was to kind of [52:52] do a little bit of everything [52:53] help people with permits and [52:53] help them fill it out [52:56] they may go do some of these [52:57] well inspections I talked about [52:59] or if there was a complaint they [53:00] were down there and they would [53:02] go talk with people and [53:04] figure it out. So we had offices [53:09] in Tulsa in Mccalister in [53:13] Woodward and in lawwin and over [53:15] the years we closed down those [53:17] offices so their jobs were [53:18] basically some of this core [53:20] capacity I was talking about [53:22] that we're able to hire staff to [53:23] be able to go fill those pos [53:25] ition s back now but we're [53:26] stationed in Oklahoma City. [53:32] you recognized thank you [53:33] chairman [53:36] what [53:40] what positions were saved [53:46] positions you you cut all the [53:47] field offices were closed [53:49] position's not hard [53:54] so throughout the20tens what [53:59] positions were kept so we had [54:02] positions in our water rights [54:04] permitting so we're basically [54:06] just lowering the number of [54:07] staff that we had we're [54:08] decreasing the size of [54:10] government so where we may have [54:12] had 10 perbiting staff at you [54:16] know at that point we had ive we [54:18] may have had 3 or4 people in our [54:19] well drillers program we dropped [54:20] that to two the people that were [54:21] working [54:24] on the technical studies that [54:25] may have that's always kind of [54:26] traditionally been about two [54:30] people so those were the types [54:31] of positions so when you cut [54:34] those down the amount of time [54:37] for applications goes up we make [54:38] there are more mistakes made on [54:40] some of these applications or [54:42] we're not able to go out and [54:44] inspect wells to make sure there [54:45] are good well drillers out there [54:45] drilling those wells [54:51] d d ition al follow up you're [54:53] recognized thank you Mr [54:53] chairirman [54:56] of the positions that [55:02] you terminated or was to not you [55:04] but was terminated and the ones [55:05] that were kept [55:06] especially [55:10] which ones of those do you think [55:11] were [55:12] the most important [55:15] that's a very good question [55:18] I would have to think about that [55:22] it's kind of like if you took [55:24] the House of Representatives and [55:25] cut out half of everybody [55:30] right and you now have [55:35] now you have to cover twice as [55:38] much area and had to talk with [55:40] twice as many constituents and [55:42] now the question is which one of [55:45] those representatives were the [55:47] most important you know that's [55:48] that's a tricky question. So I [55:49] would would have to think about [55:50] it it's really good [55:55] OK continue on thank you sir [56:01] So I mentioned the intent to [56:02] drill process this is probably [56:06] one of the great examples of the [56:09] issues that have come up the [56:15] map here shows three wells that [56:16] were drilled on an application [56:18] and [56:22] traditionally what would happen [56:24] is hey I'm going to apply for a [56:26] permit they wouldn't call us [56:28] they call the well driller and [56:29] they would say hey come drill my [56:30] wells. I know exactly where I [56:32] want to put them. I want to see [56:34] if there's water there and then [56:35] we're gonna drill them and then [56:36] I'll go apply for a permit [56:39] so in this case that's what the [56:40] well driller did they drilled [56:44] these three wells and the found [56:46] you know good water and so [56:49] they sent in their application [56:50] to go to notice and it was [56:50] protested [56:53] and right across the street [56:54] where the yellow arrow is [56:57] pointed it's another well within [56:58] a couple 100 ft. it doesn't meet [56:59] that well spacing [57:00] and [57:02] this went to a hearing [57:07] and the hearing examiner issued [57:10] a order and the hearing examiner [57:14] said that well that's closest [57:15] because there is already a [57:16] permit in place and it doesn't [57:19] meet well spacing that well over [57:22] on to the left cannot be used. [57:25] it's not supposed to be used so [57:26] the person who applied for this [57:28] permit got their perm permit [57:30] they can't use that well that [57:32] well probably costs them [57:33] anywhere from60, to100,000 [57:33] dollars to d [57:36] ri ll that the landowner lost [57:37] out on [57:40] and it put our board in such a [57:42] difficult position that you just [57:44] spent $100,000 to drill your [57:46] well and we're telling you you [57:47] can't use it because you don't [57:48] need well spacing because you [57:50] drilled your wells before you [57:52] talked with us or put in a [57:52] permit application [57:54] so again what the intent to [57:56] drill process would now do if [57:58] this person had gone to notice [58:01] or had come to us, had gotten [58:02] their permit the well driller [58:04] would have put in this permit [58:05] number they would have talked to [58:06] us and we just said hey that [58:08] well over on the left can't be [58:09] drilled because there's another [58:11] well close too close to your [58:13] permit. so that's the intent to [58:14] drill process we have a number [58:18] of these that are bored had to [58:20] decline the use of a well or [58:22] they made some restrictions on [58:23] other wells sometimes [58:26] if they don't like the board's [58:30] decision this can go to court [58:30] and we have a couple of cases [58:34] the since this went into [58:38] place we've had about495 of [58:40] those that have come through and [58:42] we've approved about 388 of [58:44] those intend to drills that the [58:45] well driller has submitted [58:46] so the the process [58:50] let let me interrupt I think [58:51] I have a question on that [58:52] subject right quick before we [58:54] leave that representative you're [58:55] recognized [59:01] Thank you chair. what what's [59:02] the minimum feet you like [59:05] between what's the minimum [59:05] fee between whales [59:12] so domestic use will start there [59:13] if everybody in this room has a [59:15] domestic well, actually you can [59:16] place them right next to each [59:20] other as far as you know you are [59:23] and we would allow that if for [59:25] if it's for any beneficial uses [59:27] that's when we'll look at well [59:28] spacing distances and what we [59:30] had for instance when we'd get [59:34] when we would get applications [59:36] for marijuana farms as you know [59:37] some of those would be close to [59:42] cities or towns or inside a a [59:43] subdivision or close by and the [59:45] well spacing is tighter and they [59:49] couldn't meet that 100,320 well [59:52] spacing distance. some aquifers [59:53] don't have a well spacing [59:55] distance at this point. there [59:57] were some rules that were put [1:00:00] into place that changed that [1:00:01] allowed us to [1:00:02] est ab li sh walls spacing [1:00:08] statewide so that distance is [1:00:11] 1320 ft for bedrock aquifers if [1:00:12] there's a permit they need to [1:00:14] meet that. Now if it's a small [1:00:16] piece of land you're putting in [1:00:18] a pecan orchard or something on [1:00:20] 10 acres and you can't meet that [1:00:22] you would request a well [1:00:24] spacing exception we'd take a [1:00:25] look at that and say well you do [1:00:26] have a right to use that water [1:00:27] will allow it this time [1:00:30] so [1:00:32] so [1:00:35] like right here we've got this [1:00:38] pivot it's got 3 wells so [1:00:41] is that not in [1:00:46] the spacing as far as the [1:00:48] well spacing how so is that all [1:00:50] is it is it fine if it's on the [1:00:51] same permit and it's the same [1:00:54] user yeah if that's a good point [1:00:56] if you're putting in your wells [1:00:57] on your own property you don't [1:00:59] have to meet that well spacing [1:01:00] requirement it's just we're [1:01:02] wanting to make sure we are [1:01:03] providing enough protection for [1:01:04] the people that are around you [1:01:07] thank you you're welcome [1:01:12] Again I deal with this stuff [1:01:14] every day and sometimes I might [1:01:14] not explain something so feel [1:01:17] free to ask questions there are [1:01:17] no silly questions [1:01:22] annual water use reporting again [1:01:24] we're trying to store restore [1:01:26] core capacity and we pulled [1:01:30] our2025 water use and looked at [1:01:31] how many people are or aren't [1:01:31] reporting [1:01:33] and [1:01:40] for2025 we had about 1000 of [1:01:44] those 13,000 permits or [1:01:46] 1w2,000 permits that did not [1:01:48] report that we sent out cards to [1:01:50] water use cards and [1:01:54] this is just a graph of showing [1:01:56] or a map showing where those [1:01:58] people are located that did not [1:02:00] submit water use reports to us [1:02:06] so what we do is we pull that [1:02:08] number it was about 1000 we send [1:02:11] out we usually send out a [1:02:14] late notice in July. This was [1:02:16] after that late notice we still [1:02:18] had about 10an0 that didn't come [1:02:20] into compliance and we reached [1:02:24] out and through that process [1:02:25] got that number down to [1:02:27] about500. now we're trying to [1:02:28] figure out where do we go [1:02:30] because we've never been here [1:02:32] before we've never been to the [1:02:33] point where [1:02:36] we've looked at this data it's a [1:02:38] requirement do we send out a [1:02:40] notice of violation do we is are [1:02:43] there fines associated with this [1:02:44] for not reporting if you haven't [1:02:46] been reporting for years? is [1:02:50] there a penalty for that and [1:02:51] traditionally there hasn't been [1:02:52] you just you do or you don't [1:02:53] report it [1:03:00] and out of those546 permits [1:03:02] there's about 135 that didn't [1:03:04] report in2024 and2025. [1:03:06] so what do you do? do you [1:03:10] do you go knock on their door? [1:03:11] do you call them [1:03:12] that you know they won't answer [1:03:14] the door you come oh I'm not I'm [1:03:18] not home so we'll see what [1:03:21] that looks like and every year [1:03:22] that we we've done this in2024 [1:03:24] and2025 we pulled the water use [1:03:26] we tried to figure out who it [1:03:28] has or hasn't reported and it [1:03:31] takes about675 hours to do that [1:03:31] of staff time [1:03:34] and part of that is because our [1:03:38] databases are2025 years old and [1:03:40] we're working on [1:03:41] modernization [1:03:44] so our databases aren't able to [1:03:46] tell us information that we need [1:03:48] to know at this point so we have [1:03:49] to do some of that manually [1:03:52] we're also doing more [1:03:54] outreachgain I've said we're [1:03:55] trying to restore core capacity [1:03:57] we've hired some people over the [1:04:00] last couple of years and we're [1:04:02] actually trying to do like a [1:04:05] mobile field office we've gone [1:04:08] out toyyan we've gone to other [1:04:11] areas we've set up shop at the [1:04:16] the local extension office [1:04:18] or whatnot I think somebody down [1:04:19] in Altus invited us to [1:04:24] their had set set a place up [1:04:26] for us to go to and we've gotten [1:04:28] pretty good response. people are [1:04:30] coming in and trying to up their [1:04:34] update their permits so it's [1:04:35] just easier for us sometimes to [1:04:36] go out and put that notice out [1:04:40] there, posted on the web and [1:04:41] people have been taking [1:04:41] advantage of that [1:04:45] we've also sent out a water use [1:04:46] card to say hey you're expect [1:04:48] your water use report to come to [1:04:50] you here in the next couple of [1:04:52] months. this next year [1:04:56] for 20 six's water use we should [1:04:58] be able to have a pay portal [1:04:59] where people can go in and [1:05:01] report that use again we're [1:05:04] modernizing our databases and [1:05:05] our ability to shore up some of [1:05:06] this [1:05:09] so this is some of the outreach [1:05:12] some of these figures are [1:05:14] picturesrs sitting down with [1:05:17] some of the patrons we work with [1:05:18] the one in the top in the middle [1:05:22] we went out and did some [1:05:24] outreach with a well driller who [1:05:26] was drilling a a well out near [1:05:28] Eri, Oklahoma. He invited us out [1:05:30] so that some of our staff could [1:05:31] see what an actual groundwater [1:05:33] well looks like from municipal [1:05:33] use [1:05:36] bottomttom left that's I believe [1:05:38] one of our board members showing [1:05:40] us peanuts out in western [1:05:41] Oklahoma [1:05:46] so looking forward again we had [1:05:49] a waste enforcement sent Bill259 [1:05:52] that went through this last year [1:05:53] there was a piece of funding [1:05:56] that came in for that I believe [1:05:59] it was 925,000 and what we're [1:06:02] looking at is our annual water [1:06:03] use reporting do we [1:06:06] what are penalties noticeices [1:06:08] of the violations, how we get [1:06:09] out there to make sure people [1:06:11] are reporting their use or using [1:06:14] their permits correctly [1:06:16] there's been some talk about [1:06:18] data centers and groundwa use [1:06:20] regulated underneath that [1:06:21] uhenter bill259 [1:06:24] and again that huge portion of [1:06:26] that so waste enforcement that [1:06:27] gives the waterboard some [1:06:30] authority to go out there and [1:06:34] try to get people into [1:06:34] compliance [1:06:39] our top priority priorities down [1:06:41] there at the bottom is known [1:06:43] unauthorized use is there [1:06:44] repeated noncompliance how do we [1:06:47] do that we're looking at a [1:06:50] little bit at open ET data that [1:06:54] t top is a photo or a satellite [1:06:56] image of some circles crop [1:06:58] circles out that might be in [1:07:00] western Oklahoma so we look at [1:07:02] those we compare to dedicated [1:07:06] lands and we say ok well there's [1:07:07] a there's a c [1:07:09] c ro p circle that doesn't have [1:07:10] dedicated lands maybe we need to [1:07:12] go talk with the landowner and [1:07:14] say hey let's update your [1:07:15] permit [1:07:18] so we've actually gone out in [1:07:20] the field to field verify some [1:07:21] of that use [1:07:26] and we across we visited [1:07:28] about60 sites that have that [1:07:32] have had use but they're no [1:07:36] permit and I did have an updated [1:07:38] slide but I think this one is [1:07:41] also a little movie here if the [1:07:42] people in the back can play [1:07:43] through that [1:07:46] basicallysically what this is [1:07:48] going to show is a a center [1:07:51] pivot going in and right [1:07:52] there in the middle of the [1:07:55] screen. I don't know no yeah is [1:07:55] there [1:08:05] And I believe there was no [1:08:06] permit on this day dedicated [1:08:07] land. [1:08:10] and part of it's probably maybe [1:08:12] some education as well like oh I [1:08:13] didn't know I needed a permit [1:08:16] there's been talk about [1:08:18] evapotranspiration data that [1:08:20] I've shown can we estimate how [1:08:22] much water use has been used [1:08:26] on this plot of land and the [1:08:27] short answer is we're not there [1:08:30] yet the data isn't detailed [1:08:31] enough to do an estimate of how [1:08:34] much water is used on a [1:08:36] particular plot this time series [1:08:37] shows the irrigation cycles [1:08:37] through time. [1:08:52] we've also compared public water [1:08:56] supply permits to our [1:08:59] dedicated lands and our [1:09:01] permit locations and we found [1:09:02] there's a discrepancy to what [1:09:05] the DEcu has in there because [1:09:08] they they regulate public [1:09:10] water supply use from public [1:09:11] water supply wells so they have [1:09:13] an inventory of all those public [1:09:15] water supply wells we compared [1:09:17] them to our permits we flagged [1:09:18] numerous public water supply [1:09:21] locations that we need to go [1:09:22] take a look at and there's kind [1:09:24] of a a running theme as [1:09:29] how many public water supply [1:09:32] permits are probably [1:09:34] noncompliant and the joke is or [1:09:36] not a joke is that all of them [1:09:38] there's probably an issue with [1:09:40] all public water supply permits [1:09:42] in the state of Oklahoma like [1:09:44] they just again call a well [1:09:46] driller come drill a well and [1:09:47] they drill it and they've not [1:09:48] gone to notice for that location [1:09:51] so that's something we're taking [1:09:52] a look at [1:09:55] we've identified 330 potential [1:09:57] sites where there might be some [1:09:57] issues [1:10:00] Again this is restoring our core [1:10:02] capacity with the additional [1:10:03] funding that we've had over the [1:10:04] last several years [1:10:08] as an example this is the city [1:10:10] of Lehigh we just went out for a [1:10:12] site visit. they had some [1:10:12] questions on drilling a well. [1:10:14] theres a well driller on site [1:10:16] and we noticed that some of [1:10:17] their wells particularly that [1:10:21] well number7 the green hashed [1:10:24] area here is our they're [1:10:27] dedicated land and the green [1:10:29] boxes are where they said that [1:10:30] they were where they went to [1:10:33] notice for their wells and that [1:10:34] well7 is clearly outside of that [1:10:38] so they at least have one well [1:10:40] that's not necessarily or that [1:10:41] may be [1:10:43] without [1:10:44] for lack of better words illegal [1:10:50] these so [1:10:57] if we send out water use reports [1:10:57] and [1:11:00] you sold your property and no [1:11:02] longer own it but it goes to you [1:11:04] you may write on that water use [1:11:05] report and say I no longer own [1:11:08] this land and send it back. we [1:11:09] still don't know who owns that [1:11:10] land but we flag it in our [1:11:13] database not to send a water use [1:11:14] report [1:11:14] out next year to you [1:11:18] there's a permit the next guy or [1:11:20] girl comes up and buys your [1:11:22] property and starts irrigating [1:11:23] we don't know who to send that [1:11:27] water use report to so we've got [1:11:30] about 3500 of these permits out [1:11:33] of 123,500 permits we don't know [1:11:35] who owns that property if [1:11:36] they're using if they're not [1:11:39] using water so again this is [1:11:39] like [1:11:42] restoring corp capacity looking [1:11:44] in our cupboards seeing what's [1:11:46] there and saying oh this is an [1:11:47] issue that we may want to [1:11:47] address [1:11:55] and this is an example of [1:11:58] looking at that open ET and our [1:12:02] dedicated lands and of these [1:12:04] permits that we don't know who [1:12:06] the owner is and some of those [1:12:08] squares there's still water [1:12:10] being used some of them there [1:12:12] isn't so those permits probably [1:12:14] can be canceled but the ones [1:12:16] that do have some open ET [1:12:18] data showing use we need to [1:12:19] visit with those landowners [1:12:24] and that's all I have on water [1:12:26] rightsdministration andjulie is [1:12:28] going to take over and I believe [1:12:29] talk about [1:12:31] comprehensive wire plan and [1:12:31] other areas [1:12:34] are there any questions [1:12:39] recognise him thank you for [1:12:41] being here we'll turn we'll [1:12:42] you're red and [1:12:46] thank you Miss Neal for that [1:12:47] information. Are there any other [1:12:48] questions for Mr Neal before he [1:12:53] OK.rectorcunningham thank you [1:13:00] Yesir. can everyone hear me? [1:13:04] appreciate certainly [1:13:07] appreciate your invitation [1:13:08] today you know water is as you [1:13:11] all know, extremely extremely [1:13:12] important especially in these [1:13:15] drought times when folks are [1:13:17] talking about it so as you [1:13:18] see we're making a lot of [1:13:20] improvements we really wanted to [1:13:22] you to understand what all [1:13:24] goes into water rights [1:13:25] administration that there's a [1:13:28] lot of laws on the books that [1:13:29] require us to do all this [1:13:31] maintenance and and and and just [1:13:32] looking [1:13:34] at land title and things like [1:13:36] that it makes these applications [1:13:38] a lot more complicated so we are [1:13:40] certainly trying to move on. [1:13:41] So I'm going to be what [1:13:41] what is our time [1:13:42] goal here [1:13:48] you got about 20 minutes 20 [1:13:50] minutes OK so I'm gonna zip [1:13:52] through these 15 maybe we will [1:13:54] ok we will talk I will talk a [1:13:55] little bit about the [1:13:56] comprehensive water plan that we [1:13:59] finalized last fall. we were [1:14:00] able to get some of the [1:14:02] recommendations through the [1:14:04] legislative process last year as [1:14:06] well as budget recommendations [1:14:08] but this process so we're [1:14:11] required by statute to update [1:14:14] the state's comprehensive water [1:14:15] plan every 10 years and so [1:14:15] this20 [1:14:19] 25 plan is just that so we start [1:14:21] by looking at at at two [1:14:23] separate things we update the [1:14:26] water demand and supply [1:14:28] projections and then look at [1:14:30] those gaps we do that through [1:14:34] 82s subbasins across the state [1:14:36] and then there are [1:14:38] recommendations and status [1:14:39] reports for each one of those [1:14:40] basins so that planners so that [1:14:42] companies and businesses moving [1:14:45] in municipalities ag [1:14:45] producers industry [1:14:50] can can use that data for to [1:14:51] understand what's happening [1:14:54] in their water supply with each [1:14:56] sector and then the other part [1:14:58] of it is the executive [1:15:01] summary and all the technical [1:15:03] work that goes into priority [1:15:04] recommendations so that could be [1:15:06] funding recommendations, [1:15:08] recommendations for legislation [1:15:10] recommendations for action, [1:15:12] and and that was completed [1:15:15] through a statewide multiyear [1:15:15] public out [1:15:18] re ach that some of you may have [1:15:21] participated in so we had ive [1:15:23] went a we had ive rounds of [1:15:26] meetings in each of ive [1:15:28] quadrants if you will of the [1:15:30] state and came up with these [1:15:32] summarize them and these [1:15:33] recommendations as far as [1:15:34] statewide recommendations. We [1:15:36] also had four different work [1:15:38] groups the the top one there [1:15:40] is theokklahoma irrrigated [1:15:42] agriculture Workroup and they [1:15:43] made some recommendations and [1:15:45] really it boiled down to the [1:15:45] need for local management [1:15:48] structures regionalized planning [1:15:52] more more local planning and [1:15:54] then broad stakeholder [1:15:56] inclusion of other water users [1:15:58] so not just the a community but [1:15:59] the other water's users and [1:16:01] demands in the area and then [1:16:02] education geared toward better [1:16:04] management, more accurate data [1:16:06] collection broader real-time [1:16:08] groundwater monitoring so we'll [1:16:09] get into some of that but that [1:16:11] we heard that not only from this [1:16:12] work group but but really all [1:16:15] over the state andris [1:16:15] emphasized the [1:16:19] the need for water data and all [1:16:20] those maps that you saw so that [1:16:22] we're that you all and and your [1:16:23] constituents can really [1:16:24] understand what's happening in [1:16:26] your in your groundwater basins. [1:16:28] So I'll just quickly go through [1:16:30] these four there were4 main [1:16:30] focus areas that we bundled [1:16:33] these into infrastructure, water [1:16:36] supply and storage so lakes and [1:16:37] the actual physical supply [1:16:40] conservation water policy and [1:16:42] then data and information and [1:16:44] really ultimate goal obviously [1:16:44] long term water security and as [1:16:45] all of you know [1:16:48] there's not one magic bullet. [1:16:50] there's just not water is very [1:16:52] local I'll get into some [1:16:54] water transfers and I know [1:16:54] you're going to talk about that [1:16:56] as well so I'll just move [1:16:58] forward water infrastructure we [1:17:00] did a need survey24 billion [1:17:02] dollars of need we actually have [1:17:03] a list of projects you can zoom [1:17:04] into your legislative district [1:17:06] and see where those projects [1:17:07] are. this is certainly not [1:17:09] comprehensive but it tells you [1:17:10] emphasizes that you know there [1:17:12] is a current24 billion dollars [1:17:14] in in water and wastewater and [1:17:15] flood control [1:17:18] projects. that's not including [1:17:20] dam rehabilitations necessarily. [1:17:21] we don't have a comprehensive [1:17:23] inventory of that but I know [1:17:26] you all you all get it they're [1:17:28] you know the last few years the [1:17:30] Apa dollars came in you all [1:17:32] dedicated over half a billion [1:17:35] dollars to water and wastewater [1:17:37] infrastructure. Last year you [1:17:40] came back with another73 million [1:17:41] dollars in water and wastewater [1:17:44] funding uh26 million of [1:17:45] that was aPpa interest [1:17:48] ear ning s which is great we [1:17:50] certainly love the fact that you [1:17:52] know there's an acknowledgment [1:17:53] of the need for for [1:17:57] for these projects and 3 35 [1:18:00] million of it came into a new [1:18:04] loan program that the water [1:18:06] boardard will administer so we [1:18:08] have several loan programs very [1:18:10] low interest tripleA rated so [1:18:11] it's the best interest rates [1:18:13] ever that that anyone can [1:18:14] get. Oklahohoma City and Tulsa [1:18:16] and all the large cities are all [1:18:19] borrowers in that program which [1:18:21] actually helps the security and [1:18:22] helps it helps lower that [1:18:24] interest rate for the smaller [1:18:26] borrowers so it the formula [1:18:26] really works [1:18:30] we administer one of the [1:18:31] programs with with the [1:18:32] department of [1:18:33] nvironmentaluality. We asked [1:18:35] for50 million recurring like [1:18:38] I said we we we got73 million [1:18:40] this year so we're really [1:18:43] looking at one that investment [1:18:44] to expanding technical [1:18:46] assistance programs so actually [1:18:49] assistants with you know for [1:18:51] these communities and ag [1:18:56] producers for long term [1:18:56] planning capital planning [1:18:58] and and conservation [1:19:01] and then workforce is always one [1:19:04] that we're looking at. so [1:19:08] this is the the 1980 plan and [1:19:12] the 1995 plan both both [1:19:13] recommended [1:19:14] water [1:19:18] transfer that was that was [1:19:20] how we're going to solve all of [1:19:22] our problems is transfer it from [1:19:23] east to west get water out to [1:19:24] the panhound, get water out to [1:19:26] Alus you know these these things [1:19:27] are are [1:19:32] are very, you know, obviously [1:19:33] we have way more water in the [1:19:34] east than we do in the west so [1:19:35] it makes sense but the problem [1:19:37] is cost right? that's always a [1:19:38] problem who's going to pay for [1:19:39] it? how are they going to be [1:19:40] paid for? these numbers are [1:19:42] actually from an update from [1:19:44] the2012 plan and you can see [1:19:47] that the construction the [1:19:49] north that middle one there 13 [1:19:52] to20 billion dollars to go from [1:19:54] the east all the way across the [1:19:55] state to the west. those are [1:19:57] in201w2 numbers so you can add [1:19:57] about47 [1:20:00] % in addition to this cost so [1:20:04] what the201w2 plan and this plan [1:20:06] really said is let's let's look [1:20:08] more locally and let's try to [1:20:10] regionalize and find those [1:20:12] solutions locally umennid is a [1:20:14] prime example we actually funded [1:20:16] through the FAP and the [1:20:19] drinking water SrF program $350 [1:20:21] million they already had their [1:20:23] water right in Ca Lake whichri [1:20:24] will tell you you have to have [1:20:25] your water right before you can [1:20:26] before you can even think [1:20:28] about transferring water. they [1:20:30] had they had to build a wall ro [1:20:31] raw water intake [1:20:34] line they built a 70 mile [1:20:36] transmission line a new water [1:20:38] plant they actually broke [1:20:40] actually I attended this ribbon [1:20:42] cutting two weeks ago and so [1:20:43] they are very very excited in [1:20:45] this particular situationrish [1:20:46] told you that they're all [1:20:48] they're 100% on groundwater. [1:20:50] this will allow them to blend [1:20:52] surface water with groundwater [1:20:55] and vastly extend their [1:20:57] their capacity they can probably [1:21:00] become suppliers for [1:21:00] surrounding areas as well so [1:21:01] this [1:21:04] is a success story as far as a [1:21:06] transfer. This took about 10 [1:21:08] years of discussing and planning [1:21:10] and trying to get this in motion [1:21:12] and trying to really [1:21:13] educating and and convincing [1:21:15] their citizens to pay for it and [1:21:16] so they have to pay these loans [1:21:18] back and so their citizens had [1:21:21] to have a sales tax increase and [1:21:22] and rate increases but now [1:21:24] they've got water security for [1:21:25] the foreseeable future [1:21:28] the next the next [1:21:30] recommendation was water supply [1:21:32] and storage so this is you know, [1:21:34] strengthening Oklahoma's dam [1:21:35] safety program. I've been here [1:21:36] before talking about the4700 [1:21:39] dams that we regulate that are [1:21:42] over60 years in age so we've got [1:21:43] a ton of infrastructure there [1:21:44] was a big infrastructure [1:21:47] construction boom over60 years [1:21:49] ago and now they they need [1:21:50] rehabilitation and we need to [1:21:54] look at them for things [1:21:55] like increased capacity. So our [1:21:55] dams and [1:21:58] our state are very important [1:21:59] they not only hold back [1:22:00] floodwater and help dissipate [1:22:03] dissipate it but they hold water [1:22:05] for drought times and so a lot [1:22:07] of those dams are are very very [1:22:08] very critical [1:22:12] agwater conservation was [1:22:14] included in this so that's still [1:22:16] kind of a driving theme helping [1:22:18] support local economic drivers [1:22:20] modernizing our agricultural [1:22:22] sector also in the eastern [1:22:24] part of the state voluntary [1:22:26] tourism and recreation related [1:22:28] water conservation so looking at [1:22:30] things like you know lowering [1:22:32] interest rates for loans to [1:22:34] communities that to fix their [1:22:36] water loss so the the more the [1:22:37] less water they're taking from [1:22:38] the stream the more they're [1:22:40] leaving in the stream for in [1:22:42] stream uses [1:22:50] these are water quality and [1:22:52] quantity of course is in the [1:22:54] in that equation as well as [1:22:56] water reuse things like [1:22:58] aquifer storage and recovery [1:23:00] we've got the framework now in [1:23:04] statute and in rules and so the [1:23:05] the job of the state is to clear [1:23:06] that so that then communities [1:23:08] and investors can go in and [1:23:10] really start using some of these [1:23:13] aquifers and and using these [1:23:14] untapped marginal waters that we [1:23:15] that we have [1:23:19] the third one was water [1:23:22] management and policy so this is [1:23:24] a modernizing the water rights [1:23:25] programme Chris just talked [1:23:26] about that maximate your yields [1:23:28] go ahead and and expediting [1:23:30] those and getting those done so [1:23:32] that new permits are under these [1:23:36] new new permit allocations [1:23:38] if you will to protect the long [1:23:41] term supply modernizing water [1:23:44] law we we actually got [1:23:46] some the well spacing through [1:23:47] legislation this [1:23:51] year as as well as water well [1:23:53] drillers indemnity fund so that [1:23:54] was a very important one. [1:23:58] again improving agwater [1:23:59] management [1:24:01] and establishing the framework [1:24:03] for fund and funding for the [1:24:04] regional water management [1:24:06] districts so this includes [1:24:07] technical support administration [1:24:09] stakeholder engagement in the [1:24:11] legal section. and I'll talk [1:24:12] a little bit more of that about [1:24:15] that in a minute. these [1:24:17] designated water districts or or [1:24:19] management areas we're really [1:24:20] still interested and hopefully [1:24:22] some of you are interested in [1:24:24] exploring measurement [1:24:26] districts there's other states [1:24:28] that have all kinds of uses [1:24:29] and and our employ [1:24:32] ing these groups in all kinds [1:24:34] of ways regulatory and non [1:24:37] regulatory to provide local [1:24:38] planning infrastructure need [1:24:40] evaluation aquifer level [1:24:42] monitoring so really bringing [1:24:46] it back into local local [1:24:47] control and local information [1:24:50] that that that can be used [1:24:53] some states use these to place [1:24:54] additional protections on [1:24:56] specific basins that are showing [1:24:58] major decline. so that's [1:24:58] something and you know Oklahoma [1:24:59] water [1:25:02] law is is very similar to other [1:25:04] western water law and so we [1:25:06] really I'm the just just now [1:25:08] passed chairman of the [1:25:08] western state's waterter co [1:25:10] which is the state engineer's [1:25:13] offices for all western [1:25:16] states so these are some [1:25:18] examples and they're in your [1:25:19] materials I won't go over them [1:25:21] but they're virtually every [1:25:24] western state has some kind of [1:25:25] formalized management group or [1:25:28] planning local planning group [1:25:29] that is [1:25:32] that has some role in either [1:25:34] water information or water [1:25:35] regulation [1:25:39] this particular one is a [1:25:40] critical grandmother management [1:25:43] area. this is oregon I believe. [1:25:44] I know Sarah had put some [1:25:46] information together for you a [1:25:48] few years ago in in this [1:25:50] particular case there's irri the [1:25:52] control and then the criteria so [1:25:55] there's serious water management [1:25:57] problem areas so the the statute [1:25:59] has determined that this these [1:26:02] things will be defined as a [1:26:04] groundwater basins that have [1:26:05] critical [1:26:08] groundwater level decline [1:26:10] unresolved user disputes or [1:26:12] frequent water shortages and so [1:26:14] those are a class of of [1:26:16] groundwater basins that then can [1:26:17] have something applied to to [1:26:17] them [1:26:20] the critical groundwater [1:26:22] management area designation [1:26:24] the commission may rule by rule [1:26:26] designate the area as critical [1:26:29] if it is and you can see those [1:26:31] six looking at groundwater [1:26:33] decline well interference etc. [1:26:35] So there are mechanisms to if [1:26:37] there are particular aquifers in [1:26:38] the state that you all want to [1:26:40] protect or that we see that you [1:26:42] all see are in critical decline [1:26:45] you can you can designate [1:26:47] them as as critical areas and [1:26:47] then [1:26:52] apply either more you know [1:26:54] more conserva more funding for [1:26:56] conservation or for [1:26:58] additional studies to really [1:27:00] understand the the area and [1:27:02] what's going on in those [1:27:04] areas and then the data and [1:27:06] information is just that you [1:27:07] can't manage what you don't [1:27:08] measure and so we're looking [1:27:10] we've got a working with the [1:27:12] Oklahohoma Hydranet through OSU [1:27:14] and the Oklama mezanett we've [1:27:15] got a [1:27:16] our all of our monitoring [1:27:18] network data goes into this [1:27:20] system and we're really working [1:27:22] toward real more real time data [1:27:25] groundwater levels [1:27:28] groundwater quality what [1:27:29] understanding exactly what's [1:27:30] what's happening in our [1:27:34] groundwater basins also we [1:27:34] administer the Oklahoma [1:27:36] Comprehensivestreamaging [1:27:37] Network. I won't get into that [1:27:38] because we're talking about [1:27:41] groundwater but and then [1:27:42] also carrying out targeted [1:27:44] regional and local water [1:27:44] availability and [1:27:46] water quality studies so we're [1:27:48] certainly interested in doing [1:27:49] that [1:27:56] so this is a database that [1:27:58] you that will be available [1:27:59] online you can go in there and [1:28:01] we've got 850 active wells in [1:28:04] this monitoring system so [1:28:05] you can go in there and [1:28:06] understand exactly what's [1:28:08] happening in in those I wanted [1:28:10] to just briefly talk about North [1:28:12] Dakota's groundwater monitoring [1:28:14] network for comparison North [1:28:16] Dakota monitors about4,000 [1:28:18] groundwater wells compared to [1:28:20] Oklahoma's 850 wells, about 10 [1:28:22] to15% of those so400 [1:28:26] 500 are actually [1:28:29] recording realtime data and [1:28:30] understanding what's happening [1:28:32] throughout time so that's [1:28:34] really important but that [1:28:36] comparison just shows you it's [1:28:38] you know there are other states [1:28:39] out there that are really trying [1:28:41] to understand just like we are [1:28:41] understand our our monitoring [1:28:42] network [1:28:46] so for quickly for legislation [1:28:47] under the public [1:28:50] in infrastructure [1:28:54] again73 million I just listed [1:28:58] the the different bills 35 [1:28:59] million for this new loan [1:29:00] program we will be coming back [1:29:02] to the legislature and and [1:29:04] really really strongly [1:29:06] encouraging that to become [1:29:08] recurring funding it's it's [1:29:10] worth every penny all the money [1:29:11] goes back into it to be [1:29:13] reloaned. We are not taking any [1:29:14] administrative fee off that at [1:29:17] all. so it just it's gonna [1:29:18] integrate right into our [1:29:20] existing system and databases [1:29:21] and and workflows [1:29:24] and that kind of thing so [1:29:25] director let me interrupt [1:29:27] uhpresentative Newton has a [1:29:27] quick question sure [1:29:31] thank you Mr Chairman. Director [1:29:32] thank you very much for the [1:29:34] information on the monitoring [1:29:36] wells you say there's about 850 [1:29:39] active monitoring wells at the [1:29:42] current time that we are not [1:29:44] able to get actual realtime data [1:29:45] from them at this present time [1:29:46] is that correct? there's a [1:29:48] handful and we are moving toward [1:29:50] that. I believe the number [1:29:50] was [1:29:54] 50 or so that we [1:29:58] that we do have realtime [1:30:01] information installed but [1:30:02] that's a very new thing and [1:30:03] that's working with the [1:30:04] hydronet. Last year we asked for [1:30:06] funding for it we didn't get any [1:30:09] funding so we are that's one [1:30:11] that we're really interested and [1:30:12] we're also interested in [1:30:13] in [1:30:16] volunteers so we we work with [1:30:18] landowners on a voluntary [1:30:20] basis to sign up for this [1:30:22] program and allow us to come out [1:30:24] and and install these wells and [1:30:25] really do that monitoring. So [1:30:26] it's just really important I [1:30:28] think that's that we've we've [1:30:30] gotten really good [1:30:32] participation from landowners [1:30:34] but it's still majority vast [1:30:35] majority of the state is is [1:30:35] privately owned as you know. [1:30:38] Paula OK he has a follow up and [1:30:40] then after him representative [1:30:42] Dobritsky has a question you're [1:30:44] next. I mean he's got a follow [1:30:46] up and then you're next [1:30:50] so on these aquifers let's [1:30:52] just use the ogallala since it's [1:30:53] a big one that's been mentioned [1:30:54] a lot. how many how many wells [1:30:56] do we have on theogallala [1:30:57] monitoring wells don't know that [1:31:01] mean I can get you that [1:31:02] information you can get that for [1:31:03] me thank you thank you [1:31:09] Thank you director for being [1:31:10] here and I realize this is [1:31:14] always challenging and we've [1:31:15] we've been having this [1:31:15] conversation for quite some time [1:31:19] currently one thing that has [1:31:21] changed in the state is interest [1:31:21] in data centers [1:31:25] and a lot of anxiety and [1:31:27] misinformation surrounding those [1:31:28] as well [1:31:31] google recently took the lead by [1:31:34] announcing the $30 million [1:31:35] investment in water [1:31:36] infrastructure in our state [1:31:39] uh2.3 of which is going directly [1:31:41] towards cedar removal my [1:31:42] question to you other states are [1:31:43] proposing [1:31:48] a use tax specifically on water [1:31:51] usage for data centers that [1:31:54] that could go toward water [1:31:56] resources board DEQ maybe [1:31:56] conservation commission [1:31:59] do you feel like [1:32:03] now would be the time to pursue [1:32:05] something new like that that [1:32:07] would create additional funding [1:32:08] for our state whenever the [1:32:09] demand seems to be [1:32:12] full full speed ahead for those [1:32:14] type centers yes thank you for [1:32:14] that question. I know we are [1:32:16] getting a a lot of calls and [1:32:18] actually this is a good time to [1:32:19] plug the governor's water [1:32:20] conference we host in December [1:32:21] we're having a session on data [1:32:22] centers so I hope you all can [1:32:26] come but yeah I think [1:32:29] certainly we we did a study [1:32:31] for the water infrastructure [1:32:34] piece on additional ways to [1:32:36] leverage and and one of those is [1:32:38] looking for instance, looking at [1:32:39] the city of New [1:32:41] Orleans is looking at hotel [1:32:46] taxes to to pay for water [1:32:47] planning and water [1:32:49] infrastructure in that area so I [1:32:51] think yes that you know not [1:32:52] not only the infrastructure [1:32:54] piece but also the [1:32:56] implementation of more, you [1:32:57] know, monitoring things like [1:33:00] that. I think that's a great [1:33:01] opportunity not not to single [1:33:03] anyone industry out but you [1:33:06] know I think we're you all [1:33:08] certainly have your work cut out [1:33:09] for you as this this data center [1:33:12] industry develops and we [1:33:14] certainly don't want you know [1:33:16] municipalities or counties to [1:33:18] miss out on opportunities if [1:33:20] they can be done done safely [1:33:22] and and [1:33:24] so appreciate that answer and [1:33:26] and look forward to the [1:33:28] governor's water conference [1:33:30] again this year three weeks from [1:33:31] today utilities committee will [1:33:34] host an interim study on data [1:33:35] centers though I thought I'd [1:33:36] just throw that bomb in the room [1:33:38] here so that everybody has kind [1:33:39] of three weeks to [1:33:42] digest that and and be prepared [1:33:44] and may I ask Mr Neal one [1:33:45] question then I'll be done. Yes [1:33:46] you bet you recognized for a [1:33:47] follow up [1:33:51] ri and I greatly appreciate your [1:33:53] work last week navigating that [1:33:54] very fun [1:33:58] s it wasn't fun very [1:34:00] interesting meeting between the [1:34:02] Oklahoma City Water Trust in the [1:34:03] Canton Lake association [1:34:06] it [1:34:12] please to clarify what I think I [1:34:13] heard in that meeting last week [1:34:17] we're we're foregoing the 30 [1:34:20] days notice from the meeting to [1:34:22] the water release in this case [1:34:22] because we feel like it's an [1:34:26] emergency but wasn't isn't there [1:34:28] in place active water [1:34:31] restrictions in Oklahoma City [1:34:32] before a release can take place [1:34:36] from what I understand yes the [1:34:38] Oklahoma's Oklama City has put [1:34:40] in place watering lawn watering [1:34:45] restrictions I believe they [1:34:48] put those in place in the2010 [1:34:50] to201f r drought and left those [1:34:52] in place so they are always [1:34:54] under some form of water [1:34:56] restrictions in Oklahoma City. [1:34:58] thank you for that clarification [1:34:59] would you be surprised [1:35:02] I I have some millennials that [1:35:06] I used to be responsible for [1:35:08] they got out on their own that [1:35:10] is a resident of Oklahoma City [1:35:12] for seven years and claims that [1:35:15] he has never seen anything in [1:35:16] his water bill or any [1:35:19] communication from Oklahoma City [1:35:21] regarding water restriction at [1:35:22] his residence [1:35:24] would you believe that [1:35:25] if [1:35:28] you don't have ok thank you [1:35:32] ok we have one more question and [1:35:34] keep in mindpresentative we are [1:35:36] running short on time thank you [1:35:37] Mr chairirman. I just I want to [1:35:38] know this this for you that I [1:35:40] wanted to touch on this you [1:35:41] talked about the Oklahoma [1:35:41] cityity and the canton lake [1:35:44] so could I could you give me a [1:35:45] best guess estimate [1:35:49] if how much water leaves [1:35:51] canton lake how much of it will [1:35:52] actually wind up in Lake [1:35:54] heffnerner Oklahoma City's [1:35:56] requested 16,000 acre feet to be [1:36:00] released from canton Lake we [1:36:03] can do an estimate one of the [1:36:04] things that we were going to do [1:36:06] from the last release is go back [1:36:07] and look at how much they were [1:36:09] able to capture so they could [1:36:10] probably capture anywhere from40 [1:36:13] to60% of that I believe is [1:36:15] probably reasonable depending on [1:36:15] the conditions if it rains [1:36:18] how hot it's been, those types [1:36:20] of things and they do a [1:36:22] calculation and they also have [1:36:24] in the agreement there's [1:36:26] water restrictions and things [1:36:27] like that they're spelled out in [1:36:28] that agreement so we can take a [1:36:30] look at that. Director, could [1:36:31] you raise your mic a little? [1:36:33] you're just a little quiet yes [1:36:36] sir thank you ok so I am zipping [1:36:40] through these so again [1:36:42] this this past session we did [1:36:44] request dam safety and [1:36:45] floodplain funding we are by [1:36:46] the [1:36:50] way the ranked the last state [1:36:55] 50th in the country for the [1:36:58] number of engineers and and [1:36:59] employees in the in that damn [1:37:01] safety program. so it really [1:37:03] emphasizes these these programs [1:37:04] have just limped along and we're [1:37:08] we are we are raising [1:37:09] interest in those again I will [1:37:10] say the hazard mitigation loan [1:37:12] programme on the right under [1:37:14] status that is something that [1:37:15] you all created a few years [1:37:15] ago [1:37:18] and have continued to put $1 [1:37:20] million I think we're on year [1:37:22] three of four that money we've [1:37:24] just received notice from FEMA [1:37:26] last week. there's going to [1:37:28] be280 million dollars available [1:37:32] nationwide and it is a 10 to1 [1:37:35] state to federal match. so every [1:37:38] $1 the federal government will [1:37:39] put in $10. they've encouraged [1:37:42] us to ask for all40 million and [1:37:43] we are going to do that so [1:37:44] that's going to be some great [1:37:45] leverage and really an [1:37:45] infusion [1:37:50] of funding that is really [1:37:51] important for hazard mitigation [1:37:54] and flood control the the [1:37:57] the very last item Okhoma Occ [1:37:57] flood controlled damm [1:38:00] rehabilitation the the water [1:38:01] plant specifically supported [1:38:03] this in the in the [1:38:04] recommendations I believe the [1:38:07] number was2.7 million that [1:38:09] that that programme received [1:38:12] last year. Again the umer [1:38:14] invasive species received about [1:38:15] 3.7 million [1:38:19] last year maxim man your [1:38:20] yields this is something that we [1:38:22] use gross production tax for and [1:38:26] that was renewed for fiveyear [1:38:28] extension so that's fantastic [1:38:30] and then water law monetization [1:38:33] we did ask for well drillers [1:38:36] remedial fund and a statewide [1:38:38] water well spacing. So now [1:38:40] anywhere in the state if [1:38:42] someone comes and tries to drill [1:38:44] a well they they have to [1:38:45] recognize the state this spacing [1:38:48] requirements so I think that's [1:38:49] very very helpful when it comes [1:38:51] to protecting private wells so [1:38:52] these are my last two sides so [1:38:55] the remaining priorities that [1:38:57] we see and that we are kind of [1:38:59] rising up to the top in addition [1:39:00] to everything we've talked about [1:39:02] today expanding capacity of [1:39:04] our infrastructure programs so [1:39:06] we certainly are going to be [1:39:08] requesting that 35 million [1:39:12] become recurring and there was [1:39:14] another 10 infusion for our [1:39:15] longstanding reap grant program [1:39:18] we think that is money very well [1:39:20] spent and and upping the [1:39:22] technical assistance to these [1:39:24] smaller systems for [1:39:26] capital improvements [1:39:30] planning they several years ago [1:39:32] you the the it was actually a [1:39:34] state question that created this [1:39:35] water infrastructure credit [1:39:37] enhancement reserve fund so what [1:39:39] that did is it allows the [1:39:41] waterboard to use the backing of [1:39:44] the state to further leverage [1:39:48] our programs and increases [1:39:50] our security from any kind of [1:39:52] risk of default we've had zero [1:39:56] defaults through the 30 years of [1:39:57] these of these loan programs [1:39:58] but what we're going to be [1:40:00] planning on doing is coming back [1:40:02] to the legislature this year and [1:40:05] asking to up that so we've never [1:40:06] touched it it's not it's not [1:40:08] something that we anticipate [1:40:10] ever touching but for the rating [1:40:12] agents agencies for Standard and [1:40:14] pooror's and Moody and Fitch [1:40:16] they look at that and in [1:40:18] their consideration of our [1:40:20] leveragging those programs so [1:40:22] that's something that we feel [1:40:24] like that you all can do and it [1:40:25] won't won't require funding [1:40:30] d d re s s drought and flood [1:40:30] drought and flooding by supreme [1:40:32] reoccurring appropriations again [1:40:34] for their damn safety and [1:40:36] theokklahoma flood plan which [1:40:38] was required to be created by us [1:40:41] through Senate bill 1269 back [1:40:44] in2020 and has yet to receive [1:40:45] funding but we've pieced [1:40:49] together some funding from [1:40:52] the apps several other agencies [1:40:54] and federal federal funding [1:40:54] emergency management Department [1:40:55] ofcomerce [1:40:59] has some funding complete the [1:41:00] groth the maximum annual yields [1:41:02] thatri mentioned so we have that [1:41:04] list and we are blazing through [1:41:06] that list really looking [1:41:08] forward to getting out there and [1:41:10] finalizing that public process [1:41:12] and and yield determination and [1:41:14] then statewide groundwater [1:41:16] monitoring certainly is [1:41:17] foundational baseline [1:41:21] information that we really [1:41:22] really need to manage these [1:41:24] aquifers. and and then again [1:41:26] support regional regional [1:41:28] planning local local planning [1:41:30] initiatives and advancing [1:41:32] precision agriculture. So those [1:41:36] are the things that we have we [1:41:38] have certainly kept on the on [1:41:40] the high priority list and then [1:41:41] itpresentative Newton we've [1:41:44] talked about these these [1:41:46] few things so really for [1:41:46] groundwater permitting [1:41:47] considering legislation [1:41:47] requiring metering [1:41:51] for new permits so that's [1:41:53] something right now that [1:41:55] could certainly be implemented [1:41:57] so permitting I mean metering [1:41:58] would not be required for [1:42:00] existing permit holders but any [1:42:02] new permit applications or in [1:42:04] certain groundwater basins [1:42:06] even critical basins you [1:42:09] could certainly explore [1:42:10] requiring me metering for those [1:42:12] new applications. consider [1:42:14] legislation on the use of [1:42:17] aquifer depletion levels as [1:42:17] triggers for issuance of new [1:42:18] permits [1:42:22] so this is something we did for [1:42:24] surface water in certain basins [1:42:26] is creating trigger lake level [1:42:29] triggers in those basins that [1:42:32] then require conservation [1:42:34] exploring local control again [1:42:36] we've mentioned that exploring [1:42:39] waste violations overuse [1:42:42] without a permit offsets through [1:42:44] master irrigators courses system [1:42:46] efficiency audits installation [1:42:47] of meters. So really any any of [1:42:48] these violator [1:42:51] s that we we are finding through [1:42:54] SB259 which requires us to [1:42:58] to take enforcement action it [1:43:00] doesn't say the waterboardme it [1:43:01] says they shall [1:43:03] and so we're trying to be [1:43:04] creative and and you know if if [1:43:08] we do find cases of waste [1:43:09] which means using water without [1:43:12] a permit and and or wasting [1:43:14] water then maybe requiring folks [1:43:15] to go through those some of [1:43:17] those some of those other [1:43:18] classes are looking at helping [1:43:20] them with system audits [1:43:24] to find those those water [1:43:25] conservation [1:43:28] opportunities and then [1:43:30] expanding monitoring and then [1:43:32] this last one water education [1:43:33] and outreach were really really [1:43:34] interested in that the state of [1:43:36] Texas has spent a lot of money [1:43:39] the last year on developing [1:43:42] water education programs as you [1:43:44] all know water law is extremely [1:43:45] complicated and there are so [1:43:47] many so much speculations and [1:43:49] it's just personal you know it's [1:43:50] you're affecting my water even [1:43:52] though legally it may not be [1:43:54] your water it's very personal so [1:43:55] I think the more we can get out [1:43:55] there and [1:43:57] and educate on so many [1:43:58] different levels I would love to [1:44:00] to do a series for for the [1:44:02] legislature as well so that's [1:44:03] all I have [1:44:06] I will take any questions thank [1:44:08] you director we we are out of [1:44:10] time but we do have one pressing [1:44:11] question by Representative Hill [1:44:11] you're recognized [1:44:14] thank you Mr Chairman greatly [1:44:16] appreciated Directorcunningham [1:44:18] thank you for being here had [1:44:19] the opportunity to kind of watch [1:44:20] it as I was coming from a town [1:44:22] hall in my district the [1:44:24] curiosity that I have is back on [1:44:25] number4 if you could go back one [1:44:26] slide [1:44:29] on the water monitoring [1:44:30] information for decision support [1:44:33] and planning assistance going [1:44:35] to the chairman's question [1:44:38] regarding data centers which [1:44:40] seems to be our new hot topic [1:44:42] that everyone likes to bring up [1:44:44] in every town hall we're in [1:44:46] curiosity if in your [1:44:48] executive summary report if it [1:44:50] did an observation of the [1:44:52] difference in water consumption [1:44:54] between a data center and a [1:44:55] manufacturing facility [1:44:59] were you able to have y'all done [1:45:00] that type of study? do you have [1:45:04] an ongoing study as thats [1:45:06] issue keeps coming up. Sure so [1:45:07] we we did not [1:45:11] dive into data centers through [1:45:13] that plan we we have we could [1:45:15] certainly do that and I think it [1:45:17] would be interesting andris ifri [1:45:19] has any input on monitoring [1:45:21] but that is certainly something [1:45:23] you know if you can get ahead of [1:45:24] something if it's it we try to [1:45:27] mimic the natural flows and by [1:45:29] removing what you know on [1:45:31] paper when we do our modeling [1:45:32] removing those uses so if you [1:45:34] can get ahead of it and really [1:45:36] understand what's happening. [1:45:37] I think that's that's very good [1:45:38] yep. [1:45:41] I'd also like to point out the [1:45:43] data center information sorry [1:45:45] I just jumped in here but the [1:45:47] data center issues didn't [1:45:49] start coming up in Oklahoma [1:45:51] until we were kind of finalizing [1:45:53] the Okoma conference of our [1:45:55] plan. I'll note here that data [1:45:57] centers may be used 1 to5 [1:45:59] million gallons of water per day [1:46:02] could be more the city of Norman [1:46:04] for an example in the wintertime [1:46:06] uses about 10 million gallons of [1:46:07] water a day and in the [1:46:08] summertime that kicks [1:46:11] up to about22 to25 million [1:46:11] gallons of water per day [1:46:15] so just for some references [1:46:17] there that's about how much [1:46:19] water is used you know for the [1:46:21] city of Norman how much water [1:46:23] data centers use just throw that [1:46:23] out there [1:46:28] one follow up thank you we're [1:46:30] out of time you bet thank you Mr [1:46:31] chairirman landed the plane here [1:46:33] for those that will continue [1:46:35] to be here in the decisions that [1:46:36] they're going to have to make [1:46:38] in the year to follow. I [1:46:40] would just ask that as we're [1:46:42] considering the importance of [1:46:44] food being homeland security so [1:46:46] is data supremacy is homeland [1:46:48] security as we're proving on the [1:46:49] southern border right now and so [1:46:52] I would just ask that that be [1:46:53] something that y'all would look [1:46:54] into as those compar [1:46:57] able s because I think that [1:46:58] information is going to be [1:47:00] extremely relevant to the [1:47:01] decisions our great state's [1:47:02] about to make thank you thank [1:47:03] you Mr chairman. [1:47:04] right thank you sir [1:47:07] thank you thank you doctorctor [1:47:08] Cunningham and thank you [1:47:11] division chief Neil thank you [1:47:12] very much for your presentation [1:47:15] very informative. would like [1:47:17] to call to the table [1:47:21] executive director Dwayne Smith [1:47:24] from the OA institute and then [1:47:26] also I think Mr McClintock [1:47:28] are you going to present or are [1:47:29] you just gonna let him do it? [1:47:32] right. Schmith you're recognized [1:47:34] to present talk about water [1:47:36] planning and the water [1:47:38] sustainability so we are [1:47:40] privileged to have you here and [1:47:41] thank you very much for being [1:47:43] here. Tell us what's your job [1:47:44] title is exactly and then I'll [1:47:45] turn it over to you [1:47:48] now in my life [1:47:52] good morning good to be here [1:47:54] and Julie thanks for only [1:47:55] leaving me 10 minutes. I [1:47:57] appreciate that that's that's [1:47:57] the [1:48:00] so formerly I was the executive [1:48:01] director of the Oklahoma [1:48:02] waterter Resources Board I was [1:48:04] there for 1w2 years retired from [1:48:05] the state in2010 [1:48:10] went to Afghanistan with the [1:48:11] corps of engineers did water [1:48:12] planning in afghanistan so I'll [1:48:14] share some stories about [1:48:15] afghanistan and [1:48:15] northwestokklahoma [1:48:20] and now I am the executive [1:48:22] director of the Oa institute OCa [1:48:24] is the Choctaw and Chickasaw [1:48:26] word for water so the water [1:48:26] institute at the Central [1:48:27] University. [1:48:30] I will say for our OSU fans our [1:48:33] colors are orange and black so [1:48:34] we're the bright orange at the [1:48:35] central [1:48:36] and [1:48:38] oh man [1:48:40] yeah there's a [1:48:42] yes [1:48:48] and so I also do consulting work [1:48:50] in my past I've done regional [1:48:51] water planning I'm gonna talk a [1:48:52] little bit about that all over [1:48:54] Oklahoma I want to talk about [1:48:55] the results of some of those [1:48:56] so that's who I am [1:49:01] and I'll go through very briefly [1:49:03] some of my slides and let me [1:49:10] Julie [1:49:15] there we go so the Oak institute [1:49:18] was established in2016 and Susan [1:49:20] Paddock was the original [1:49:22] director of the Oa institute [1:49:23] former state senator from Ada [1:49:28] and it was funded and started a [1:49:30] unique partnership between the [1:49:31] Chickasaw nation and the city of [1:49:34] Ada and East Central University [1:49:35] and the goal was to be able to [1:49:36] provide [1:49:40] support for sustainable water [1:49:41] policy. [1:49:44] as a part of that we established [1:49:46] not only the Oa institute as a [1:49:48] part of a technical group but a [1:49:50] water master's program [1:49:53] Do Pappas is here who heads [1:49:56] up the water masters program in [1:49:58] water management and policy at [1:49:58] East Central University we have [1:50:00] a number of graduates that are [1:50:04] working across Oklahoma in [1:50:04] water policy and management [1:50:10] So why must we plan for [1:50:12] sustainability and the first [1:50:12] thing I want to do is address [1:50:15] the sustainability word because [1:50:15] it's it's not [1:50:20] some people use that word in [1:50:22] ways that I wanna make sure that [1:50:23] you understand how I intend that [1:50:23] word to be used [1:50:27] sustainability can be replaced [1:50:27] with reliability [1:50:32] it's essential for economic [1:50:35] development so water has to go [1:50:37] hand in hand with economic [1:50:38] development it's got to go with [1:50:39] the money [1:50:42] and so as we talk through this I [1:50:43] want to make sure that [1:50:48] that we don't use this word [1:50:49] in in different ways that might [1:50:50] mean different things for [1:50:52] purposes of my discussion it's [1:50:53] really about economic [1:50:55] development. I look at the 1und0 [1:50:56] year hydrograph in Oklahoma [1:51:00] and in 1957 was our worst [1:51:01] drought of record and if you [1:51:04] look back in that time before [1:51:06] you know the 1980s [1:51:08] most of our history was drought [1:51:11] and since that time [1:51:15] it's been the longest wettest [1:51:15] period in our history [1:51:20] so I tell people that I started [1:51:22] at the waterboard and it in in [1:51:23] the 1980s [1:51:28] and I left at2010 so I take [1:51:30] credit for the longest wettest [1:51:31] period in Oklahoma's history [1:51:35] but with that comes a lot of [1:51:35] things [1:51:38] when we were in that long [1:51:41] drought and in 1957 that's when [1:51:42] the water board was formed [1:51:44] that's when the Texas waterter [1:51:46] Development Board was formed it [1:51:48] was a devastating piece we had [1:51:50] gone through the dirty thirties [1:51:52] now we're in the fiftiess the [1:51:53] worst drought ever [1:51:55] that's when [1:52:00] Bob Kerr started talking about [1:52:02] federal reservoirs we had ive [1:52:04] bureau of reclamation reservoirs [1:52:06] built26 corps of engineers [1:52:07] reservoirs all of these [1:52:08] reservoirs that we enjoy today [1:52:14] came from the realization that [1:52:15] we had to survive a drought [1:52:20] so now we come forward and we [1:52:22] went into our longest wettest [1:52:23] period in history [1:52:25] and what we did was became [1:52:25] complacent [1:52:29] we thought that this was our [1:52:31] normal this is one thing we have [1:52:31] to understand about water [1:52:36] waterter is so local and it's so [1:52:38] unique to us we looked about [1:52:39] surviving [1:52:42] turning on our tap when we want [1:52:44] water turning on our shower when [1:52:46] we want to take a shower or [1:52:48] irrigating through a drought or [1:52:50] we we don't think about this [1:52:51] generationally [1:52:54] this is where the water [1:52:55] resources boardard plays a vital [1:52:55] role [1:52:58] all of that comprehensive water [1:53:00] planning stuff that you see [1:53:02] talking about how much water can [1:53:04] be pumped per acre over a period [1:53:05] of time [1:53:05] is really [1:53:08] a long term plan for that [1:53:14] the local plans come locally [1:53:16] with a community or with a [1:53:16] region or with an irrigator [1:53:19] and so when this was formed [1:53:22] this [1:53:25] was the hydrograph that formed [1:53:28] the basis of our water policy as [1:53:29] we see it [1:53:34] inadequate inadequacies in [1:53:36] Oklahoma's water law the water [1:53:37] laws are what they are [1:53:40] let's don't blame the water [1:53:41] board for the inaccuracies or [1:53:43] inadequacies in the water law [1:53:44] theres there's the law they're [1:53:45] the policy that's set [1:53:48] but we started with a [1:53:51] conservation statute and back in [1:53:54] the seventiess and60s there was [1:53:56] a water law advisory group that [1:53:58] was formed that was included the [1:54:00] major industries in Oklahoma [1:54:01] OG&E Farm Bureau [1:54:06] a bunch of them and they got [1:54:09] together and they said that we [1:54:10] have to have a utilization [1:54:12] statute we can't we can't [1:54:16] irrigate in the panhandle if we [1:54:17] have a conservation statute the [1:54:17] science is clear [1:54:21] the science is clear you get one [1:54:22] inch of recharge in the ogallala [1:54:25] if you're going to raise corn [1:54:26] you're going to use24 to30 [1:54:26] inches [1:54:30] Right? so so the water levels [1:54:31] going down [1:54:34] let's don't I don't know that [1:54:36] anybody should be surprised [1:54:38] today to say we have a mining [1:54:39] statute I would say that mining [1:54:40] statute's working [1:54:40] we're mining the groundwater [1:54:46] This was really [1:54:48] the public policy at the time [1:54:52] we want this to be a private [1:54:53] property right [1:54:56] we're gonna to allocate your [1:54:57] water and you can do with that [1:54:58] water what you want to do with [1:54:59] it [1:55:02] the public policy what we heard [1:55:04] from the panhandle landowners [1:55:06] what we heard from irrigators [1:55:08] particularly were that they [1:55:10] needed two acre feet of water to [1:55:11] irrigate crops [1:55:15] So what happened as a matter of [1:55:16] laws we're going to have a [1:55:18] mining statute we're going to [1:55:20] allow mining to happen but the [1:55:22] realization of that was we were [1:55:25] going to have a 1980 water plan [1:55:27] that moved water from eastern [1:55:29] Oklahoma to the west so that [1:55:32] when we had those declines we [1:55:34] could mitigate those declines [1:55:35] with transferring water from [1:55:36] easternokklahoma to western [1:55:38] Oklahoma and if you look at the [1:55:40] 1980 plan there's a northern [1:55:42] transfer there's a central [1:55:42] transfer and a southern [1:55:45] transfer taking water all the [1:55:46] way to the panhandle [1:55:52] So what we see is a policy that [1:55:53] allows for mining but the [1:55:54] mitigation strategy [1:55:57] of moving water is [1:56:00] billions of dollars today [1:56:04] and can you imagine pumping [1:56:06] water from southeast Oklahoma [1:56:07] from some reservoir [1:56:08] to irrigate [1:56:12] in the panhand or to irrigate in [1:56:13] southwest Oklahoma [1:56:14] when [1:56:19] it a billions of dollars it will [1:56:19] have to be publicly [1:56:22] subsidized in order to do that [1:56:24] what we're seeing though [1:56:28] is those water transfers are [1:56:29] viable in some areas Oklahoma [1:56:30] City ista water from Sardis Lake [1:56:35] en n id from carrreservoir you [1:56:36] know we have the we have some of [1:56:38] this transfer going but it's [1:56:39] around a corner [1:56:43] stone piece that can afford that [1:56:44] can provide the economic [1:56:45] viability to that [1:56:48] so the question becomes well [1:56:49] what do we do with agriculture [1:56:53] and I would say you look at [1:56:55] Oklahoma panhandle look at [1:56:56] Texas, look at Kansas [1:56:59] Kansas is public water supply [1:56:59] it's not private [1:57:03] go forbid that Oklahoma would go [1:57:06] make their water public [1:57:08] our surface water's public our [1:57:09] groundwater's private [1:57:10] Texas [1:57:13] different laws in multiple [1:57:14] states and the declines are all [1:57:15] very similar. [1:57:20] so when you allow irrigation of [1:57:24] corn or crops in the panhandle [1:57:26] regardless of what your statute [1:57:28] is regardless of your management [1:57:30] plan regardless of your metering [1:57:31] you're going to see water level [1:57:31] declines in the panhandle [1:57:35] and that's what we see that was [1:57:35] very clear in the eightiess [1:57:36] and it's very clear today [1:57:40] what the irrigators have done in [1:57:41] the panhandle [1:57:45] is made their efficiency they [1:57:46] really spent money on [1:57:46] efficiencies [1:57:50] so when you look at an irrigator [1:57:52] today and they they know how [1:57:53] much water they're using they [1:57:54] know what their water levels are [1:57:58] they know what that is they know [1:58:00] that if they irrigate one piece [1:58:01] of property over here [1:58:06] or another 10 acres over here [1:58:07] they know what the water needs [1:58:08] are on those particular 10 acre [1:58:09] tracts [1:58:11] and they sense those and they [1:58:13] they manage those in such a way [1:58:14] to extend that water as long as [1:58:15] possible [1:58:20] if we were to change the policy [1:58:20] and say oh well now you [1:58:24] can't irrigate or you can't do [1:58:25] that the economic [1:58:28] piece of that initially would it [1:58:29] it is [1:58:32] is a great economic loss [1:58:37] so some of the discussion has [1:58:38] been around meeting should we [1:58:39] require require meters [1:58:42] so I'm not the director of the [1:58:44] water board anymore so I can [1:58:45] have an opinion on that. [1:58:50] I believe that water metering [1:58:52] isn't to make an irrigator more [1:58:53] efficient [1:58:58] if they needed a meter to make [1:58:59] their their system more [1:58:59] efficient they'd have one [1:59:03] they're efficient because they [1:59:05] know how much they're pumping [1:59:07] and they are saving pennies on [1:59:07] the bushel [1:59:08] to make money [1:59:12] so you don't see 40 acre [1:59:12] corn [1:59:17] farms anymore right they're [1:59:18] they're they're hundreds and [1:59:21] thousands of acres and and if an [1:59:22] irrigator can make a penny a [1:59:25] bushel or two pennies a bushel [1:59:27] I've heard them talk about this [1:59:28] if they can make that kind of a [1:59:30] difference they can make money [1:59:32] the smaller ones can't we're [1:59:34] it's it's now it's become bigger [1:59:36] because of the economics of it [1:59:40] if they use less water that's [1:59:40] less money they spend on [1:59:41] pumping. [1:59:49] One thing our laws don't do is [1:59:50] look at the environmental [1:59:51] benefit [1:59:54] so when you look at a stream [1:59:56] water permit and you look at [1:59:57] beneficial uses [2:00:00] we don't take into account the [2:00:02] nonconsumptive use what is that [2:00:04] nonconsumptive use fish and [2:00:05] wildlife etc [2:00:07] some people say well we don't [2:00:08] want to prioritize fish over [2:00:09] people. [2:00:12] but I would submit to you that [2:00:14] if you remove the fish [2:00:18] and you remove the environmental [2:00:19] benefit of our water [2:00:22] you don't have a reliable system [2:00:26] you don't have a reliable system [2:00:28] for withdrawals for industry for [2:00:29] cities or irrigators [2:00:32] so it has to be taken into [2:00:36] account is one priority take it [2:00:37] into account we shouldn't be [2:00:37] afraid of that analysis [2:00:42] Water sustainability [2:00:46] I look at thelue river we've [2:00:47] done a recent economic study on [2:00:47] the Blueriver [2:00:52] $1.5 billion of economic benefit [2:00:53] in thelue river. [2:00:58] and the reason for that is that [2:01:02] thelue river is reliable it's a [2:01:03] perennial stream it's not [2:01:03] intermittent [2:01:07] it that provides the reliability [2:01:09] for the city of Durant it [2:01:10] provides the reliability for [2:01:13] cattle producers to water [2:01:17] it reply it supplies the [2:01:19] reliability for the recreation [2:01:20] and tourism that comes with that [2:01:23] if you were to use the [2:01:24] Oklahoma's current water law [2:01:28] in appropriate 100% of the [2:01:31] average annual flow you could [2:01:34] make it's possible you could [2:01:34] make thelue river intermittent [2:01:38] you've impacted $1.5 billion [2:01:40] of economic impact [2:01:45] my recommendation is we need to [2:01:45] consider [2:01:50] those nonconsumptive uses as we [2:01:52] look at water rights I'm not [2:01:52] saying that you [2:01:56] those need to be considered and [2:01:57] they need to be considered from [2:01:57] an economic [2:01:58] impact. [2:02:04] The water board has made very [2:02:05] strong progress [2:02:07] and and I want to go through an [2:02:07] example [2:02:15] and of course communities aging [2:02:16] infrastructures the huge deal [2:02:18] and I'm gonna talk a little bit [2:02:20] about what I think is a major [2:02:21] policy proposal on communities [2:02:26] so these are the water plans [2:02:27] that I have done [2:02:30] so the panhandle regional water [2:02:31] plan northwestokklahoma [2:02:33] actionlan oss reservoir drought [2:02:34] contingency plan [2:02:37] southwestokklahoma water supply [2:02:38] and the Choctaw Chickasaw [2:02:39] regiongal water planin. [2:02:43] and out of these there's been [2:02:44] over a billion dollars of [2:02:46] economic investment out of these [2:02:48] plans I want to say that not one [2:02:51] penny of state money has gone to [2:02:51] these re this regional planning [2:02:54] in southwest Oklahoma [2:03:00] they wanted this was in2011 when [2:03:01] they had the big drought and as [2:03:04] you recall they thought then [2:03:06] that lugeralus reservoir would [2:03:07] never fail again. [2:03:09] and ir0 days later it was [2:03:09] overflowing [2:03:15] the panhandle region Chris Neal [2:03:17] put together some maps you know [2:03:19] in June of'73 31 permits [2:03:22] now 10,000 permits statewide [2:03:24] we've seen those maps [2:03:27] now we see the declines [2:03:32] I I want to ask you what does [2:03:32] the next 50 years hold? [2:03:42] Our northwest water action plan [2:03:44] Julie talked about the car [2:03:46] reservoir pipeline that came out [2:03:47] of the northwest waterter action [2:03:47] plan [2:03:50] that was that group of [2:03:52] communities and rural water [2:03:54] districts supported that plan [2:03:55] with the city ofennid [2:03:58] it was hard for the city of Enid [2:04:00] to get that passed the water [2:04:01] rates had to go up [2:04:03] it was very difficult to do that [2:04:08] but the reality was they were on [2:04:09] groundwater [2:04:11] I was the original hearing [2:04:14] examiner on Enid's groundwater [2:04:15] permit back in the eighties [2:04:18] they thought that the [2:04:18] groundwater was going to be [2:04:19] their long term supply [2:04:24] They had groundwater declines [2:04:25] and high nitrates [2:04:27] they had to go to carr reservoir [2:04:32] $350 million to provide a [2:04:33] reliable water supply [2:04:37] southwestokklahoma we talked a [2:04:39] little bit about Lugardaus and [2:04:40] some of the landowners [2:04:41] you know [2:04:42] the science is clear [2:04:46] if you take water above in the [2:04:48] alluvial deposits above our [2:04:49] reservoirs the science is very [2:04:49] clear [2:04:51] you're going to impact the yield [2:04:52] of the reservoir [2:04:55] when you look at Tom Steed [2:04:58] reservoir. I think the most [2:04:58] important water supply in [2:05:00] southwest Oklahoma because it [2:05:02] supplies water to Alus Alus Air [2:05:03] forcece Base. [2:05:05] Frederick [2:05:06] Schnyder [2:05:12] if you were to fully implement [2:05:13] the Oklahoma water law [2:05:15] appropriate a 100% of the firm [2:05:15] yield [2:05:20] of 100% of the flow above [2:05:21] tomsteed reservoir that would [2:05:23] reduce the firm yield of steed [2:05:24] to virtually zero [2:05:25] the science is clear [2:05:30] so what the water board did [2:05:32] after after eight years of study [2:05:33] with the Bureau of Reclamation [2:05:34] in local folks as they [2:05:35] implemented a rule [2:05:39] to look at how we protect [2:05:40] Tomsteed reservoir and Lugudaus [2:05:44] first time the water board's [2:05:45] done that to protect a reservoir [2:05:48] a very positive move for that [2:05:50] now [2:05:54] the city of Altis has drilled [2:05:55] wells in Texas brings Texas [2:05:55] water to [2:05:59] Alus they have a reverse osmosis [2:06:00] plant [2:06:04] Tomsteedreservoir has drilled [2:06:05] wells to supplement the firm [2:06:05] yield [2:06:09] and now we have a sustainable [2:06:10] water supply where Alttairir [2:06:12] Force base was number one on the [2:06:13] list [2:06:16] for the most vulnerable water [2:06:17] supply of a military [2:06:18] installation in the United [2:06:19] States [2:06:20] it's now off that list [2:06:24] because of the local planning [2:06:28] that was done funded through [2:06:30] state funding sources that the [2:06:32] legislature's approved with [2:06:32] folks like the water boardard [2:06:33] and and others [2:06:38] we look at the [2:06:41] regional water plan the [2:06:42] settlement agreement that was [2:06:44] approved by the state the tribes [2:06:45] and Oklahoma City. [2:06:48] and and so one of these regional [2:06:50] plans I do want to talk about is [2:06:52] Oklahoma cityity we talk a [2:06:52] little bit about Canton because [2:06:53] that's in the news now [2:06:56] one of the reasons in the [2:06:58] settlementgre agreement [2:06:59] discussions [2:07:01] from Oklahoma City was that [2:07:04] because of the lack of [2:07:05] recognition of groundwater [2:07:07] surface water interaction and [2:07:07] groundwater pumpage [2:07:12] canton reservoirs yield was [2:07:13] decreased the firm yield was [2:07:13] decreased [2:07:15] when you look at [2:07:19] Chris Neel's slide that Oklahoma [2:07:22] City has 390,000 acre feet in [2:07:25] water rights and uses 150,000 [2:07:26] you might think well Oklahoma [2:07:27] City's got plenty of water [2:07:30] talk about the firm yield that [2:07:32] yield it's only there during a [2:07:33] drought [2:07:36] that's why Oklahoma City needed [2:07:37] to go toardusreservoir. [2:07:41] Now why is Oklahoma City the [2:07:43] beneficiary you know the good [2:07:43] thing about Oklahohoma City [2:07:46] is that they have multiple [2:07:47] reservoirs [2:07:50] so they have canon they have [2:07:52] heffner they have oververholser [2:07:53] they have Tom Steed they've got [2:07:56] aokka they've got McGee Creek [2:07:57] and now they're coming with [2:07:57] Sardis [2:07:59] and you might say well they're [2:08:00] gobbling up everything but for [2:08:01] Sarddu [2:08:04] part of that agreement was [2:08:06] Oklahoma City you have to have a [2:08:07] conservation plan in place [2:08:11] you have to have your reservoirs [2:08:14] below50% before you can take [2:08:15] water from Sardus in other words [2:08:15] they didn't want [2:08:19] a sailboat regatta at Lake [2:08:21] Heffner while Sardus Lake is a [2:08:22] 40 acre frog pond [2:08:29] those that benefit now provides [2:08:31] Oklahoma City with future water [2:08:33] supply for economic development [2:08:35] Oklahoma City wouldn't even be a [2:08:36] I don't believe would even be a [2:08:39] skeleton of what they are today [2:08:41] had they not made the decision [2:08:42] to go to Mcee Creek and itoka. [2:08:46] it was controversial all the [2:08:47] city council lost their jobs [2:08:51] none of the other communities [2:08:51] wanted to go on board [2:08:52] but now look [2:08:59] Piedmont, yukon El Reno you know [2:09:00] all of them Newcastle they all [2:09:01] have ties to Oklahoma City [2:09:05] the future growth of this area [2:09:06] depends upon Oklahoma City. [2:09:14] We look at four pillars of [2:09:15] sustainability [2:09:16] I want to talk a little bit [2:09:17] about [2:09:19] the Terry Peach project with the [2:09:19] conservation commission [2:09:23] removing cedar trees cedar trees [2:09:24] use50 gallons of water a day you [2:09:26] know the stories468 million [2:09:27] cedar trees [2:09:30] it reduces the viability of a [2:09:31] producer to make money on their [2:09:31] land [2:09:36] this is an incredibly important [2:09:38] piece of how we have to tie all [2:09:39] of this together [2:09:41] into a comprehensive [2:09:42] plan [2:09:45] to manage our water resources [2:09:49] our Chickasaw hoctawlan [2:09:53] I want to say that Texas is [2:09:53] coming at us [2:09:57] whether we like it or not [2:09:57] they're coming at us [2:10:01] they're coming across the ed [2:10:03] river they're coming up the75 [2:10:04] corridor. they're coming up the [2:10:07] 35 corridor they're coming up [2:10:08] now on the north side of Lake [2:10:09] Texoma [2:10:12] we look at population [2:10:14] projections and we would look at [2:10:16] old comprehensive water plan [2:10:18] projections of a straight line [2:10:19] demand projection for Bryan [2:10:19] County [2:10:22] was a part of the study that we [2:10:23] did with the corps of engineers [2:10:26] they're growing faster than that [2:10:29] right now we don't we got [2:10:31] moratoriums on adding hookups [2:10:35] all over Bryan County [2:10:36] southernokklahoma Water Corp all [2:10:37] the way to Ardmore [2:10:40] landnd values are skyrocketing [2:10:41] in that area. [2:10:43] if you own that land it's a [2:10:43] great thing [2:10:49] so what do we do what do we do [2:10:49] about water supply [2:10:57] I think the groth corridors [2:11:00] the4fo corridor Newcastle [2:11:05] ick ck as ha Tuttle Blanchard [2:11:05] that area's blowing up over [2:11:06] there [2:11:10] you look at the thir5 corridor I [2:11:12] talked to Washington and all of [2:11:14] those communities along that [2:11:14] 35ardmore [2:11:17] all the way along there Paul's [2:11:17] alley [2:11:20] Goldsby [2:11:22] Purcell, Norman [2:11:27] their future is going to be more [2:11:27] water [2:11:28] and where are they're going to [2:11:29] get it [2:11:33] intensive plans need to take [2:11:34] place in those areas [2:11:40] as we look at [2:11:44] you know, I don't want to go [2:11:45] over a bunch of numbers with you [2:11:48] you know the success it's it's [2:11:49] no longer a proof of concept [2:11:51] what we do at theoka institute [2:11:53] is we're not a consultant for [2:11:54] communities we go work with [2:11:57] those we get grant monies we got [2:11:58] FEMA grant monies to look at [2:11:59] drought fire and flood [2:12:03] that's how we support ourselves [2:12:06] we now have a grant with EPA [2:12:07] with the University of New [2:12:08] Mexico where theokake institute [2:12:09] is going to be the lead [2:12:10] technical [2:12:14] assistance for small communities [2:12:16] in Oklahoma so we're gonna be [2:12:18] working with Oklahoma it takes [2:12:20] multiple trips to a community. [2:12:24] to get them to understand water [2:12:25] sustainability [2:12:28] typically what communities say [2:12:29] is I can't afford it [2:12:35] I want to talk a little bit [2:12:36] about the Arbuckle Simpson [2:12:38] aquifer you guys are aware of [2:12:40] the controversy comes up to you [2:12:42] every single year you put a [2:12:45] moratorium on mining expansions [2:12:46] until a study's done to look at [2:12:48] the impacts of mines in the [2:12:49] Arbuckle Simpson [2:12:52] you put2 million dollars at the [2:12:53] water board [2:12:55] and the Oa institute [2:12:56] said they would match it [2:13:02] that was Susan Paddock said she [2:13:03] would match it. I didn't, but we [2:13:03] are [2:13:07] so now what we're doing and the [2:13:10] reason for the study is because [2:13:12] the regional study looked at the [2:13:13] amount of water that can be [2:13:14] taken out on a regional basis [2:13:18] per acre2 acre feet per acre it [2:13:20] went from two acre feet to.2 [2:13:21] acre feet [2:13:25] so every community every person [2:13:26] that's wanting to use water and [2:13:28] drill a well and use it for [2:13:29] beneficial use besides domestic [2:13:33] was reduced to0.2 acre feet per [2:13:35] they had to buy 10 times the [2:13:36] lane or5 times the lane to get [2:13:38] the same amount of water city of [2:13:39] ada etc [2:13:42] the mining companies were exempt [2:13:45] and and it's not because mine [2:13:46] I'm not gonna dog the mining [2:13:48] companies they were exempt from [2:13:50] getting water permits since the [2:13:52] beginning of the water rights [2:13:53] administration back in the [2:13:53] eighties [2:13:54] Water in a producing mine was [2:13:55] exempt from getting a permit [2:13:58] and it was because of their [2:13:59] unique [2:14:03] per ation that they have they [2:14:04] don't use it they have to move [2:14:05] it to mine [2:14:09] and you know and in the [2:14:09] Arbuckleimpson [2:14:12] where the community [2:14:16] and industry have to protect [2:14:16] springs and streams the mines [2:14:17] don't [2:14:24] So this is a way and this and [2:14:26] the legislature said in there [2:14:28] that the water board DEQ and [2:14:29] department ofines do not [2:14:34] know the impacts of the mines so [2:14:36] they appropriated money to be [2:14:38] matched to look at what that is [2:14:41] and now we are doing what I [2:14:41] believe cutting edge [2:14:43] technology using [2:14:46] a helicopter to do [2:14:50] aerial electromagnetic data [2:14:51] collection determine the faults [2:14:52] and flow paths [2:14:58] to turn to determine a process [2:14:59] by which we can have minds in [2:15:01] the Arbuckleimpson our goal is [2:15:01] not to get rid of the mines [2:15:05] or to get rid of large water [2:15:07] wells in the Arbuckleimpson our [2:15:08] goal is to protect springs and [2:15:09] streams [2:15:12] Doctor Lauren Haygood is here [2:15:13] she's gonna lead she's the [2:15:15] technical lead for that study [2:15:16] we're going to use doctorctor [2:15:17] Toddhallahan from OSU [2:15:20] we believe the best science team [2:15:22] is available and I want to [2:15:24] discuss with you what I believe [2:15:26] the model is for future studies [2:15:27] in Oklahoma and the region [2:15:31] and that is to form a technical [2:15:31] advisory committee [2:15:36] have scientists that specialize [2:15:37] in this work [2:15:39] come together and advise on [2:15:40] what the science [2:15:45] data collection should be and [2:15:46] what those interpretations are [2:15:50] and then alongside that have a [2:15:52] robust stakeholder group that [2:15:54] gets together routinely and [2:15:56] talks to the scientists and [2:15:57] understands the policy as we [2:15:57] move forward [2:16:00] let's don't do the science and [2:16:01] then [2:16:04] try to inform stakeholders then [2:16:05] let's do that together [2:16:07] and I believe this is a model [2:16:09] that you should look at [2:16:12] as we do basin studies in [2:16:12] Oklahoma. [2:16:21] Regional water planning [2:16:22] so [2:16:26] Mr chairman in the interests of [2:16:27] time [2:16:32] I'm going to move through [2:16:36] and I want to talk just a little [2:16:37] bit about economic development [2:16:38] and and water infrastructure [2:16:45] and you know in inokklahoma you [2:16:46] know twentyome billion dollars [2:16:47] of need in Oklahoma [2:16:51] we don't have enough grant money [2:16:53] to fix our infrastructure [2:16:56] when you look at a community and [2:16:57] we say you can't afford it [2:16:58] what are we saying [2:17:02] the reason they're in the [2:17:04] situation they're in is because [2:17:05] they can't afford it [2:17:07] so to put a dribble of [2:17:11] 2 $4 billion of need [2:17:16] and and we put50 or or 100 [2:17:16] million or a billion dollars [2:17:17] into that [2:17:19] we're not fixing the problem [2:17:22] by giving the communities [2:17:23] money [2:17:29] What we have to do is establish [2:17:32] a policy I think of and and look [2:17:33] at affordability of water [2:17:36] and I I looked at when we were [2:17:38] minus22 degrees and we didn't [2:17:39] have [2:17:42] electricity in our communities [2:17:44] and the outrage that came from [2:17:45] that [2:17:45] and what happened [2:17:50] we raised rates and built [2:17:52] additional infrastructure so [2:17:52] that we can withstand that [2:17:57] with our communities the entire [2:17:58] backbone of our community [2:18:02] the entire backbone of economic [2:18:03] development is around water. [2:18:07] and if we look at an [2:18:07] affordability rate [2:18:12] EPA says that nationally it's [2:18:14] about2.5% of the median [2:18:15] household income [2:18:17] for water and wastewater [2:18:18] if you look at that [2:18:23] and take the average median [2:18:24] household income in Oklahoma and [2:18:25] the average water rate [2:18:28] there's about600 million dollars [2:18:29] a year [2:18:33] in infrastructure money that's [2:18:33] not being spent on [2:18:34] infrastructure [2:18:38] if you were to take that600 [2:18:40] million and leverage that like [2:18:42] the water board does with state [2:18:43] money you could be talking [2:18:44] you know [2:18:48] $10 billion [2:18:51] over 10 years to go into [2:18:51] infrastructure [2:18:56] our grant money then should go [2:18:58] to help those communities that [2:18:59] are at that affordability rate [2:19:03] it doesn't have to be2.5% [2:19:05] whatever we decide that is [2:19:05] that's just an example [2:19:09] but we're giving grant [2:19:09] oftentimes the [2:19:14] plan for a community is to not [2:19:15] improve it so that they come [2:19:16] higher on a priority list for a [2:19:18] grant and then we give a grant [2:19:19] for a consent order to implement [2:19:20] that [2:19:21] I've heard him say it [2:19:25] So [2:19:28] maybe we should look at the [2:19:29] policy and say [2:19:33] you you you come to your [2:19:33] affordability rate [2:19:36] and then we'll provide grants to [2:19:37] help you above that [2:19:39] as a taxpayer [2:19:44] this is part of the problem with [2:19:45] regionalization that I hear we [2:19:46] talk about Friday night football [2:19:48] fights and communities don't [2:19:49] want to combine and that's part [2:19:50] of it [2:19:52] but I've heard a lot of it is [2:19:55] that one community has let their [2:19:55] system go bad [2:19:58] and the other community didn't [2:20:00] want to combine with them [2:20:00] because they don't want to [2:20:01] subsidize that community [2:20:07] We have to look at these small [2:20:08] communities that can't afford it [2:20:10] regionalization is in their [2:20:11] future [2:20:16] the other communities regionally [2:20:18] like southwestokklahoma like [2:20:20] Fosse Reservoir like northwest [2:20:22] Oklahoma like the panhandle [2:20:26] we've got to pull local people [2:20:28] together stakeholder development [2:20:30] and let them [2:20:30] understand [2:20:34] what their future's gonna look [2:20:35] like and they have to plan that. [2:20:37] and it works [2:20:40] So [2:20:46] that's my spiel we have our [2:20:47] okcaon conference [2:20:52] coming up October 14th we are [2:20:54] doing this we're having one day [2:20:55] on community sustainability [2:20:59] and we're gonna talk about [2:21:00] affordability rates we're gonna [2:21:01] we we're expecting about 100 [2:21:05] people to come with the [2:21:06] department of commerce we're [2:21:08] gonna specifically talk about [2:21:09] economic development and water [2:21:10] and wastewater infrastructure [2:21:14] on the in the comprehensive [2:21:16] water plan the water board says [2:21:17] so I don't have to own this [2:21:17] number [2:21:20] a billion dollars of investment [2:21:21] is24,000 jobs [2:21:23] that's investment in [2:21:23] infrastructure [2:21:27] think if we put $10 billion in [2:21:30] 10 years240,000 jobs [2:21:34] Department of Commerce is coming [2:21:36] and they're going to help we're [2:21:38] going to help with a plan and [2:21:39] help with a policy on how we do [2:21:39] that [2:21:42] I don't know exactly how it's [2:21:43] going to turn out [2:21:46] but I'm excited to go through [2:21:47] the process thank you very much [2:21:52] Any questions [2:21:52] smith [2:21:56] thank you very much very very [2:21:58] informative thank you very much [2:21:59] for that presentation [2:22:00] right [2:22:05] we and this would like to now [2:22:07] call Mr Kimball to the table to [2:22:07] present [2:22:10] so we've talked about [2:22:12] infrastructure we've talked [2:22:14] about sustainability [2:22:18] so let's dream a little bit and [2:22:20] so I have called Mr Kimblell [2:22:22] here to help us and we talked [2:22:26] about water transfer and so I'm [2:22:28] gonna let him talk about [2:22:30] that. Did you have some handouts [2:22:31] that you want to give out or [2:22:31] anything? [2:22:38] I'm not quite as sophisticated [2:22:39] as some of these others what [2:22:42] what I have is a legal pad and [2:22:44] an $8 calculator from Office [2:22:46] Depot. Well you're you recognize [2:22:48] if we go with that thank you [2:22:50] very much for being here thank [2:22:52] you so much for inviting me this [2:22:53] is something that's near and [2:22:54] dearer to my heart that I've [2:22:55] been working on for a few years [2:22:58] I've buttonholed a few of the of [2:23:02] the legislators I am very [2:23:04] proud member of the Grand River [2:23:06] Dam Authority Board I've been on [2:23:08] that board starting my 14enth [2:23:10] year I do represent the House of [2:23:12] Representatives on that board [2:23:14] our board's made up of three [2:23:16] appointments from the governor's [2:23:17] office one from the speaker one [2:23:18] from the prote [2:23:22] one from the cities we sell to [2:23:24] and one that from the co ops [2:23:25] that we sell to [2:23:26] we're on and I was just [2:23:28] appointed last week for another [2:23:29] five year term so I'm a glutton [2:23:30] for punishment [2:23:34] Grad River Dam Authority from [2:23:36] from the people in the room here [2:23:39] is owned 100% by the state of [2:23:42] Oklahoma we were formed in 1935 [2:23:47] to take care of the new [2:23:50] reservoir that was built at [2:23:51] Grove Oklahoma and Pensacola Dam [2:23:54] our dam is [2:23:56] mile long [2:24:02] it didn't it impos uh40,000 [2:24:02] acres of water [2:24:06] it's66 miles long 140 ft deep [2:24:08] and 938 miles of shoreline [2:24:12] and they were talking earlier [2:24:14] about water transfer water [2:24:15] transfer is a big pro big [2:24:15] project [2:24:19] and if you come to from [2:24:20] western Oklahoma and say we're [2:24:22] going to put a a pipe in Grand [2:24:24] Lake and start pumping water [2:24:24] west [2:24:28] or you're gonna hear a lot of a [2:24:28] lot of people probably start [2:24:29] hollering [2:24:32] so it's very difficult to go in [2:24:33] and say we're going to take [2:24:34] water from here and take it to [2:24:35] there [2:24:37] even if you don't need it where [2:24:37] it's at [2:24:38] but [2:24:42] it's not difficult to take the [2:24:44] water away from the people in [2:24:45] New Orleans Louisiana [2:24:48] Most people don't really [2:24:49] understand [2:24:53] the water in Grand [2:24:53] Lakenyoshoriver [2:24:57] and when Grand Lake was formed [2:24:58] the department of Interior gave [2:25:02] the neosho river forms from the [2:25:03] sppring river and the [2:25:06] Neoshoriver coming out of Kansas [2:25:07] at Twinridges State Park [2:25:12] GRDA and the state of Oklahoma [2:25:12] own the water [2:25:16] from Twinridges State Park [2:25:20] that goes through Grand Lake [2:25:22] goes through Lake Hudson goes [2:25:24] through Lake Fort Gibson we [2:25:26] don't own Fort Gibson but we do [2:25:26] own the water in it [2:25:29] and that water belongs to the [2:25:29] state of Oklahoma [2:25:32] until it gets to the Arkansas [2:25:33] river [2:25:36] we're not controlled by the [2:25:38] corps of engineers as most of [2:25:40] the dams and rivers in the state [2:25:41] are [2:25:44] if a city or somebody wants [2:25:46] water out of our reservoir they [2:25:48] don't go to the water resources [2:25:50] board they go to our seven [2:25:51] member board [2:25:54] our seven member board sets the [2:25:56] water rates we dr char we charge [2:25:58] about $13.5 per 1000 gallons for [2:25:59] water [2:26:00] it's pretty [2:26:04] misunderstood around the lake [2:26:08] but my concept is not to take [2:26:10] water out of Grand Lake or Lake [2:26:11] Hudson or Lake Fort Gibson. [2:26:15] because the water is owned by [2:26:16] the state of Oklahoma and GRDA [2:26:20] it is not a primary source for [2:26:22] water to be used in the [2:26:24] navigation channel that's [2:26:24] controlled by the corps of [2:26:25] engineers [2:26:28] when we generate electricity at [2:26:29] Pensacola Dam at Grand Lake [2:26:32] our water goes intolake Hudson [2:26:36] into Lake Fort Gibson into the [2:26:37] Arkansas river [2:26:38] to LittleRock [2:26:43] to the Mississippi river and to [2:26:46] the Gulf of Mexico it's not used [2:26:48] for navigation it's not used for [2:26:51] irrigation it's not used as [2:26:53] potable water oncece it goes [2:26:54] through generation it's going to [2:26:55] New orleans [2:26:58] and used for absolutely nothing [2:27:02] when we're generating [2:27:03] electricity at Pensacola Dam [2:27:07] we have6 generators and when [2:27:08] we're generating full generation [2:27:12] we're releasing 13,500 cubic [2:27:13] feet of water per second. [2:27:18] cubic foot of water7.48 gallons [2:27:24] if we captured 1000 cubic foot a [2:27:25] second [2:27:28] of the 1ir5 still sending tw25 [2:27:29] south [2:27:36] we would be capturing7,480 [2:27:36] gallons of water every second [2:27:41] 448000 gallons of water every [2:27:41] minute [2:27:48] 646272000 gallons of water [2:27:49] every24 hours [2:27:54] that's2.5 times the amount of [2:27:55] water that the city of Tulsa [2:27:56] treats everyday [2:27:59] that's a lot of water [2:28:02] and that belongs to us at the [2:28:03] state of Oklahoma [2:28:08] the moving it west [2:28:09] is [2:28:10] difficult [2:28:12] but not impossible [2:28:16] right now there's a pipeline or [2:28:18] may have just recently been [2:28:20] completed coming from aokka to [2:28:21] Oklahoma City 98.6 miles [2:28:25] it's a se2 inch line and that [2:28:27] line carries just a little over [2:28:29] 100 million gallons of water a [2:28:29] day [2:28:32] that water line cost $800 [2:28:33] million [2:28:38] we would need6 of those lines to [2:28:40] move the water west [2:28:44] that we could produce every day [2:28:47] by capturing 1000 cubic foot a [2:28:48] second [2:28:52] and just let your mind wander a [2:28:53] minute and say well know what [2:28:54] happens if we'd go down and do [2:28:55] the same thing below Lake [2:28:55] Hudson. [2:28:58] what if we did the same thing [2:29:00] below the dam at Fort Gibson. [2:29:01] it's our water [2:29:03] that would be capturing 3000 [2:29:08] of the 13,500 cubic foot a [2:29:10] 2nd and 2 billion gallons of [2:29:11] water [2:29:13] every24 hours. [2:29:18] that it's not being used for [2:29:20] anything in the state of [2:29:20] Oklahoma today [2:29:24] we would be sending [2:29:26] 200 acre feet [2:29:31] of water west every day from one [2:29:32] of our facilities [2:29:40] Now there's peoples people are a [2:29:42] little bit questionable about [2:29:44] some of our our metrics there [2:29:45] but I promise you the numbers [2:29:46] are correct. I've worked with [2:29:47] Burnsmcdonald Engineering [2:29:48] Company [2:29:50] and [2:29:50] said well [2:29:54] what do you do with the water [2:29:55] when it gets there you may not [2:29:56] need it all the time but it's [2:29:57] real simple [2:30:00] you use it for irrigation you [2:30:01] use it for what cities need it [2:30:04] and what you don't need you [2:30:04] refill or aquifers [2:30:06] what a novel idea [2:30:12] hass anybody done that? yes it's [2:30:13] being done in Wichita Kansas [2:30:13] today [2:30:16] I was in Wichita four years ago [2:30:19] they take water they just treat [2:30:21] 30 million gallons a day out of [2:30:22] the littlet Arkansas river. I [2:30:24] don't know if anybody's ever [2:30:25] been to the littlettle Arkansas [2:30:25] River up by Wichita [2:30:28] but that water's about like [2:30:29] thirtyweight motor oil. [2:30:34] and it can only flow enough that [2:30:35] they can only operate their [2:30:36] facility 9 months out of the [2:30:37] year [2:30:40] they take that water and put it [2:30:42] in set in a settling basin then [2:30:44] they run it through a filters [2:30:46] very simple filtration and then [2:30:48] they run it through ultraviolet [2:30:50] light to kill the bacteria.alf [2:30:51] of it goes to [2:30:54] Wichita to treat for city water [2:30:57] the other half goes to refill [2:30:58] aquifers [2:31:02] one of the aquifers up there I [2:31:03] just [2:31:04] got looked at a report [2:31:05] just the other day [2:31:08] was500 million [2:31:09] acre feet [2:31:14] reduced from 1940 until now [2:31:20] in the last 9 years,2/3 of that [2:31:21] has been refilled [2:31:21] 2 / 3 [2:31:26] and every aquifer in our state [2:31:27] today is being [2:31:30] every one of them [2:31:32] cities they're using wells [2:31:34] going dry [2:31:38] we have the water it's in the [2:31:39] wrong place [2:31:42] it can be moved [2:31:44] you can move [2:31:49] a lot of water and it's going to [2:31:50] cost about [2:31:51] 4 to5 billion dollars [2:31:54] that sounds like a lot of money [2:31:56] but I promise you [2:31:59] in just a few years [2:32:02] that's going to be very very [2:32:03] inexpensive [2:32:06] probably not in my lifetime. [2:32:07] I'm80 years old [2:32:08] we'll see [2:32:12] our water more valuable than our [2:32:13] oil. [2:32:14] it's coming. [2:32:20] and we have the water our water [2:32:21] quality is very very good [2:32:25] we have our own water quality [2:32:27] PhD on staff we have a water [2:32:27] quality lab [2:32:32] that is second only to DEQs and [2:32:33] three years ago for the first [2:32:36] time in26 years the nitrogen [2:32:37] level in Grand Lake started [2:32:37] decreasing [2:32:40] and it's decreasing every year [2:32:41] at the water clarity is getting [2:32:42] better [2:32:45] Arkansas river produces a lot of [2:32:46] water but it's a lot harder to [2:32:47] treat because of the salinity [2:32:51] our water is very easy to treat. [2:32:51] it's very clean water [2:32:56] the the water is [2:33:00] more than anything is ours [2:33:00] without [2:33:03] the core of engineer inference [2:33:04] that we have at the rest of our [2:33:05] reservoirs [2:33:06] the [2:33:10] the value [2:33:12] of that water [2:33:16] will be noticed real quickly by [2:33:18] somebody we'll see private [2:33:19] enterprise come in and try to [2:33:19] get our water [2:33:22] I beg you to keep that water [2:33:25] for our children and [2:33:26] grandchildren's future in [2:33:27] economic development in this [2:33:28] state [2:33:32] our biggest natural resource [2:33:33] was oil [2:33:38] we have some income from oil but [2:33:40] our jobs went back south they [2:33:41] went to Texas [2:33:45] with our water moving around the [2:33:46] state where it's needed [2:33:50] we can produce jobs for our [2:33:52] children and grandchildren that [2:33:53] are just not even really thought [2:33:53] of today [2:33:56] when you think of of things you [2:33:58] have water we've ur heard [2:33:59] earlier today about the data [2:33:59] centers [2:34:03] we have the second largest data [2:34:04] center in the world Prior [2:34:05] Oklahoma [2:34:06] and we supply the water it's not [2:34:07] a problem [2:34:12] google is a very good customer [2:34:13] of ours but they do use a lot of [2:34:13] water [2:34:16] but when you look at the [2:34:17] industry [2:34:20] silicone chips use a lot of [2:34:22] water to make too and they [2:34:22] produce really good jobs [2:34:26] but you can't go to Dallas and [2:34:26] Fort Worth and make silicon [2:34:28] chips today because they don't [2:34:29] have any water for you [2:34:31] they've got incentive money [2:34:32] they can write you a big check [2:34:36] but if you tell them you need200 [2:34:37] million gallons of water a day [2:34:38] they'll sell byebye [2:34:38] they don't have it [2:34:46] My presentation is not fancy [2:34:46] it's not a lot of charts [2:34:50] it's just bare facts we have the [2:34:51] water [2:34:53] it's in the wrong place [2:34:57] in today's dollars it's very [2:34:57] costly to move it [2:34:58] how [2:35:02] it's going to be very [2:35:04] inexpensive in the years to come [2:35:05] particularly [2:35:08] when you look at the jobs that [2:35:09] it can produce [2:35:12] just imagine what could be done [2:35:13] at Burn's flat [2:35:14] just imagine [2:35:18] you know the one thing the the [2:35:19] marijuana people taught us [2:35:22] is how much we can do with drip [2:35:23] irrigation [2:35:24] it's about the only good thing [2:35:25] they did but [2:35:30] get political there a minute [2:35:33] but with drip irrigation [2:35:39] we can we can raise crops that [2:35:41] you don't even think about today [2:35:42] they're closing lettuce fields [2:35:43] in California because they have [2:35:44] no water [2:35:46] you see what they're doing with [2:35:47] the Colorado river today [2:35:49] Phoenix just canceled [2:35:54] a60 home development because [2:35:55] they could not get water permit [2:36:00] they have the jobs they have the [2:36:02] people needing the housing but [2:36:03] they can't build the housing [2:36:03] because they don't have the [2:36:04] water [2:36:06] we have the water now it's time [2:36:07] to get the jobs [2:36:08] we can build the houses [2:36:12] we can do everything we need [2:36:14] with the water that we own in [2:36:17] the state of Oklahoma that's [2:36:19] literally been overlooked for a [2:36:19] few years [2:36:23] I'll be happy to answer any [2:36:23] questions [2:36:28] we have we just have a great [2:36:29] resource that [2:36:32] that I hope you all will take a [2:36:33] closer look at [2:36:36] keep it in the hands of the [2:36:38] state of Oklahoma let the state [2:36:41] of Oklahoma prospers and not [2:36:42] private enterprise off of our [2:36:43] natural resource [2:36:46] and give our children and [2:36:46] grandchildren a chance [2:36:47] to have [2:36:52] a great place to come back to [2:36:52] after school and live [2:36:56] and let those those boys and [2:36:57] girls wearing those blue FFfa [2:36:58] jackets let them have a future [2:37:01] where they grew up in [2:37:01] westernokklahoma [2:37:08] we can feed if you go to go to [2:37:11] a bottle of water that we we [2:37:13] sell for a a bucket quick trip [2:37:17] you buy a case it's cents a [2:37:17] bottle at Walmart [2:37:21] that same bottle at Walmart in [2:37:22] California is about42 cents [2:37:30] So I'll be more than happy to [2:37:31] answer any questions [2:37:34] Any questions [2:37:36] So [2:37:38] I have a question [2:37:42] so how much do you say it would [2:37:44] cost to put a what size [2:37:46] pipeline basically a76 inch [2:37:49] the atoka pipeline72 inches [2:37:50] about as large as you'd want to [2:37:52] build and that's what the atoka [2:37:56] pipeline is. it runs 98.6 miles [2:37:58] from aokk at Oklahoma City to to [2:38:00] the lake here to get to [2:38:06] Fairview or Comanche you're [2:38:08] gonna it's going to be about 190 [2:38:09] miles from Pensacola so [2:38:13] you're looking at probably if [2:38:15] it was 800 million for 100 miles [2:38:16] today it'll probably be a [2:38:17] billion for hund0 miles so [2:38:18] you're looking at2 billion [2:38:19] dollars probably [2:38:20] to build that pipeline [2:38:24] and they follow [2:38:28] so they could and that would be [2:38:30] able to you'd have to do some [2:38:32] filtration to inject that down [2:38:34] into the aquifers is that [2:38:34] correct or can it go straight [2:38:35] into there? [2:38:38] you can put it into the aquifers [2:38:41] with either sediment aquifer [2:38:42] there's a lot of different [2:38:43] aquifers and there's a lot of [2:38:44] smarter people in the room on [2:38:46] that there's there's different [2:38:47] types of aquifers some are [2:38:49] easier to recharge than others [2:38:52] some can be done with just [2:38:54] settlement basing some has done [2:38:55] with the low powered injection [2:38:55] wells [2:39:00] but there again the technology [2:39:01] is there they're already doing [2:39:01] it [2:39:04] and any time you have excess [2:39:05] water in that pipeline [2:39:09] 24 hours a day just keep filling [2:39:10] the aquifers [2:39:13] one of the big issues on any [2:39:14] pipeline is right away [2:39:19] GRDA happens to have high [2:39:21] lines in75 or77 counties some of [2:39:24] our some of our right away you [2:39:25] can use for pipelines some you [2:39:25] can't [2:39:29] but if I go out to western [2:39:30] western Oklahoma and tell a [2:39:31] farmer I'm gonna run a big high [2:39:36] 300 ft tall transmission line [2:39:38] across his farm and it's going [2:39:40] to pop and crackle and snap and [2:39:42] scare your cows he's gonna [2:39:43] probably lawyer up and be ugly [2:39:43] with us [2:39:46] If I go tell him I'm gonna run a [2:39:49] a pipeline across the the corner [2:39:52] of his property and his cows can [2:39:53] still graze on it you can bale [2:39:54] the hay on top of it. you're [2:39:56] going to see a vent pipe every [2:39:58] mile or two [2:40:00] and we're gonna put up a meter [2:40:02] on that and all you got to do is [2:40:03] call this number and we'll [2:40:04] remotely turn that meter on you [2:40:06] you can water your [2:40:10] your cows you can fill your farm [2:40:11] ponds or you can irrigate [2:40:12] he's gonna probably hug me [2:40:20] I have a question what is the [2:40:23] elevation at the Grandriverd Dam [2:40:23] with this water is [2:40:27] what's the elevation? OK at the [2:40:29] bottom of the dam the elevation [2:40:31] is right at600 feet above sea [2:40:34] level. The increase in elevation [2:40:37] from pensacola Dam to westford [2:40:38] Oklahoma is almost the same [2:40:42] difference in elevation from a [2:40:44] toka to Oklahoma City it's very [2:40:46] close it's about 350 ft [2:40:46] depending on [2:40:47] where you go with it [2:40:51] that's where I was going with [2:40:52] that what would the elevation be [2:40:54] to like uhpresentative Duton's [2:40:57] area are you 1500 ft or do you [2:40:58] know what your elevation is? [2:41:02] that that's my question is [2:41:05] pumping water uphill is very [2:41:07] difficult have you looked into [2:41:08] the engineering on that what it [2:41:10] would take to pump 1000 ft [2:41:11] uphill [2:41:16] the pumping water is very [2:41:18] difficult. there's a lot of [2:41:19] better technology today they've [2:41:20] done some excellent technology [2:41:21] on the atoka pipeline [2:41:26] the one thing about we're [2:41:27] in the electric business [2:41:31] and so we we have the electric [2:41:34] lines in75 or se77 counties so [2:41:36] it's the electricity that we [2:41:36] generate could be used for part [2:41:37] of it [2:41:40] the way it works with FERCederal [2:41:42] Energyregulatory Commission if [2:41:44] there's any any high line any [2:41:48] any real water district lines [2:41:51] anything close to it they have [2:41:52] to let us run our electricity [2:41:54] over that line and FERC sets the [2:41:56] tariff on that as to how much we [2:41:58] pay for doing it lus we could do [2:42:00] we could utilize the technology [2:42:04] on some solar panels to to [2:42:04] operate some of the pumps [2:42:08] there's a a mixture of [2:42:09] answers there [2:42:12] depends on the geography more [2:42:12] than anything [2:42:19] you but the answer is we can get [2:42:19] the water west [2:42:22] and the other answer is we do [2:42:23] have the water [2:42:27] thank you Mr Kimblell any other [2:42:27] questions? [2:42:30] OK [2:42:32] so summarizing [2:42:34] water is essential [2:42:36] we have a need [2:42:40] waterter's crucial to our future [2:42:44] and a last part I've asked Mr [2:42:46] Kimball to give us another [2:42:48] possibility to dream. what can [2:42:52] we do to help solve a problem [2:42:55] here and so I appreciate all the [2:42:57] presenters. thank you very much [2:42:59] for the information. I think it [2:43:00] was very informative. I thank [2:43:02] you for all the members [2:43:05] attending and with that I'll [2:43:06] turn back over to the chairman. [2:43:07] Miss chairirman thank you very [2:43:08] much for allowing us to have [2:43:09] this study [2:43:13] that concludes interim study for [2:43:14] today we're all dismissed thank