1 00:00:04,910 --> 00:00:28,450 Okay, good evening. I will call the November 12th, 2025, meeting of the Heritage Preservation Commission order. First up is a roll call. Present tonight. We have commissioners. Summers, Polns, Mino, Hemdall, Larson, Council representative, Tussen, and Council representative Collins and myself being Tussen. 2 00:00:28,450 --> 00:00:32,730 And we absent tonight is Commissioner Finnell. 3 00:00:35,150 --> 00:00:39,930 So move on to approval of minutes, the possible approval of minutes from the October 4 00:00:39,930 --> 00:00:43,270 15th, 2025 regular meeting. 5 00:00:43,790 --> 00:00:46,870 Does anyone have any corrections or a motion to approve? 6 00:00:54,990 --> 00:00:59,870 There are a couple of typos in the first section, case number CD, 7 00:01:00,170 --> 00:01:01,910 2025-040. 8 00:01:03,410 --> 00:01:11,230 Well, my last name in the fourth paragraph, it has an ass on it, which is incorrect. 9 00:01:12,150 --> 00:01:17,310 But the next paragraph, it doesn't make any sentences and make any sense planning, manager 10 00:01:17,310 --> 00:01:24,290 good neck, replied that if the items are tabled, have 60 days to act on comma, yet. 11 00:01:24,930 --> 00:01:28,630 I don't know what's missing there, but something is, 12 00:01:32,310 --> 00:01:34,430 maybe it is, if the items are tabled, 13 00:01:34,430 --> 00:01:38,490 the applicant has 60 days to act upon? 14 00:01:40,220 --> 00:01:42,620 Commissioner Sherry think it might have been that we 15 00:01:42,620 --> 00:01:45,900 the staff would extend the review for an additional 60 days so it would be 16 00:01:45,900 --> 00:01:48,120 told 120 but we can take a look into that. 17 00:01:48,540 --> 00:01:52,280 Okay. I concur that something is definitely missing. 18 00:01:59,260 --> 00:01:59,900 Other correction? 19 00:02:18,350 --> 00:02:21,910 Set in the vote count for improving the minutes last time it's 20 00:02:21,910 --> 00:02:26,690 said that, you know, in constant stream and I'm guessing 21 00:02:26,690 --> 00:02:28,190 those probably somebody else that abstained. 22 00:02:28,670 --> 00:02:31,550 Okay, I think that should be palms and suit of columns on 23 00:02:34,460 --> 00:02:35,760 any other corrections. 24 00:02:40,660 --> 00:02:44,460 Staff are you okay, making that one more about those 60 days. 25 00:02:44,680 --> 00:02:46,420 We are chair commissioners, thank you and apologies. 26 00:02:48,420 --> 00:02:52,960 So with those corrections, would anyone want to make a motion to approve the minutes? 27 00:02:54,500 --> 00:02:56,240 I approve the minutes with changes. 28 00:02:56,980 --> 00:02:58,760 Okay, we have a motion from Minos a second. 29 00:02:59,760 --> 00:03:00,380 Second, Lars. 30 00:03:00,960 --> 00:03:04,080 Okay, a motion from Minos a second from Lars and is there any further discussion? 31 00:03:04,080 --> 00:03:08,160 And hearing none, all those in favour, please say aye. 32 00:03:09,540 --> 00:03:09,580 Aye. 33 00:03:09,580 --> 00:03:10,240 Any opposed? 34 00:03:11,300 --> 00:03:11,760 I'll leave state. 35 00:03:12,340 --> 00:03:12,500 Okay. 36 00:03:13,860 --> 00:03:14,000 Okay. 37 00:03:15,700 --> 00:03:18,000 So it would be homes and hembal abstain. 38 00:03:19,120 --> 00:03:20,480 And everybody else votes for us. 39 00:03:20,580 --> 00:03:26,540 So that is I think four to four votes in favor. 40 00:03:26,540 --> 00:03:28,080 No votes against and to abstentions. 41 00:03:29,220 --> 00:03:31,040 The motion passes and the minutes are approved. 42 00:03:32,240 --> 00:03:33,660 Next up is the open form. 43 00:03:33,660 --> 00:03:39,100 It's an opportunity for the public to address the commission on subjects, which are not part of the meeting. 44 00:03:39,780 --> 00:03:44,680 The commission may take action or reply or give direction to staff, and we ask that people 45 00:03:44,680 --> 00:03:46,860 limit their comments to five minutes or less. 46 00:03:47,000 --> 00:03:48,980 Is anyone here tonight for the open forum? 47 00:03:50,480 --> 00:03:54,080 Seeing no one else close the open forum and we'll move on to the consent agenda. 48 00:03:54,320 --> 00:03:55,860 There's nothing on the consent agenda. 49 00:03:56,600 --> 00:04:03,120 There's nothing under public hearing or unfinished business tonight, which takes us to new business. 50 00:04:03,120 --> 00:04:09,080 And we'll start out with case number CD2025-048, 51 00:04:09,260 --> 00:04:11,940 design review for new construction duplex in the neighborhood 52 00:04:11,940 --> 00:04:16,220 conservation district at 950 oin streets or in 53 00:04:16,220 --> 00:04:17,300 street north. 54 00:04:17,960 --> 00:04:21,100 And with that, I will turn it over to staff for report 55 00:04:21,100 --> 00:04:25,100 them of an opportunity for the commission to ask questions 56 00:04:25,100 --> 00:04:28,400 of staff them of like the applicant to come up. 57 00:04:28,400 --> 00:04:30,400 And then more questions and then we'll have a discussion 58 00:04:30,400 --> 00:04:33,100 So, would that turn over to staff? 59 00:04:33,940 --> 00:04:34,520 Thank you, Chair. 60 00:04:35,060 --> 00:04:47,640 As we consider case 2025-048, we have this presentation to go into some of the details of the project under consideration today. 61 00:04:48,360 --> 00:04:55,660 As far as regulatory review, this is in the RB2 family residential district and the neighborhood conservation district. 62 00:04:55,660 --> 00:04:59,840 The proposal before us is for a duplex. The lot has over 21. 63 00:05:00,000 --> 00:05:27,020 1,000 square feet and a duplex is permitted by right on lots greater than 10,000 square feet in this district. The proposed work is a new duplex on an existing vacant lot. The proposed project meets or exceeds all dimensional and land use standards. And the duplex is not side by side, but rather a front unit and a rear unit accessed from a side driveway presenting visually as a single family home. 64 00:05:27,020 --> 00:05:36,060 The Commission in 2024 approved a design for a single family home at this same site that was of a more contemporary and less traditional nature. 65 00:05:36,980 --> 00:05:48,180 But the applicant before us proposes a new design that's not yet been reviewed by the Commission and the lot is still vacant with the previously approved plans never having been acted upon. 66 00:05:49,040 --> 00:05:57,520 for a site map so that you can tell a bit the situation of the new duplex on the lot. 67 00:05:58,020 --> 00:06:03,100 You'll see that there are two nearly identical duplexes, one front and one rear, 68 00:06:03,920 --> 00:06:08,720 one with a side loading and one with a partial slash side loading garage. 69 00:06:09,720 --> 00:06:17,660 The garage on the front unit is set back a little over 10 feet from the leading edge of the home. 70 00:06:17,660 --> 00:06:28,000 which is a requirement both of our design guidelines as well as that of the RB2 family residential district. 71 00:06:29,820 --> 00:06:35,040 The front of the home is set back 50 feet from the property line, whereas code would require 20 feet. 72 00:06:35,660 --> 00:06:45,540 It's set back 11 feet from the north property line, where the over 24 feet from the south property line, 73 00:06:45,540 --> 00:06:50,440 where the combined side setbacks would be 15 feet required by code. 74 00:06:52,880 --> 00:06:54,440 For the renderings before us today, 75 00:06:54,880 --> 00:06:58,300 as you may have noted in the add on packet that was sent this morning, 76 00:06:58,780 --> 00:07:01,180 we've received updated renderings from the applicant 77 00:07:01,900 --> 00:07:05,100 after the time in which the original packet was sent out. 78 00:07:05,460 --> 00:07:10,060 And this is the design proposal at consideration today. 79 00:07:11,140 --> 00:07:13,980 You have the North and South elevations in the middle, 80 00:07:13,980 --> 00:07:22,140 with the East Elevation, which is that viewed from Owen Street North in the sort of larger design at the bottom. 81 00:07:22,980 --> 00:07:28,240 The West Elevation, which you see smaller up top, does not have any street frontage, 82 00:07:28,320 --> 00:07:34,640 but that is the way that the home would look when viewed from its driveway after access has been 83 00:07:34,640 --> 00:07:42,300 achieved around the side of the front unit. The recommended conditions of approval that we have for you 84 00:07:42,300 --> 00:07:46,160 that the designs shall be consistent with those on file in the community development department 85 00:07:46,160 --> 00:07:50,540 except is modified herein. Prior to the release of a building permit the applicant and or 86 00:07:50,540 --> 00:07:54,760 property owner shall provide proof of conformance to the approved design approval granted herein. 87 00:07:55,220 --> 00:07:58,900 All minor modifications to the plan shall be approved in advance by the city planner. 88 00:07:59,400 --> 00:08:03,140 All major modifications shall be approved in advance by the Heritage Preservation Commission 89 00:08:03,140 --> 00:08:07,280 determination of the distinction between major and minor is defined in the Zoting ordinance. 90 00:08:07,780 --> 00:08:12,080 And finally, project plan shall be updated to reflect principles called for in foresighted design 91 00:08:12,300 --> 00:08:14,900 with the inclusion of further windows were noted by staff. 92 00:08:15,540 --> 00:08:21,000 Now to address the updated windows that we see in the elevations today, 93 00:08:21,500 --> 00:08:25,720 the initial renderings off of which those staff comments in that fourth condition were based 94 00:08:25,720 --> 00:08:33,460 can be seen here. Staff particularly called out the lack of windows on the upper story 95 00:08:33,460 --> 00:08:40,600 of the southern elevation, the lower level of the east elevation facing the street, 96 00:08:40,600 --> 00:08:45,980 and then the sides of the north elevation. 97 00:08:47,040 --> 00:08:54,280 And so to compare this original rendering off of which this condition was based versus the plans that we have today, 98 00:08:54,880 --> 00:09:00,300 the applicant has provided plans that have new windows and all of these locations. 99 00:09:01,060 --> 00:09:05,720 So the distinctions between the two plans can be seen before us. 100 00:09:05,720 --> 00:09:11,640 We have symmetry now facing oh and street with the lower level window that mirrors that above 101 00:09:11,640 --> 00:09:18,260 it and provides harmony in window design and we also have the inclusion of windows in 102 00:09:18,260 --> 00:09:26,460 some hallways as well as bathrooms on both the north and south elevations that we feel 103 00:09:26,460 --> 00:09:32,760 as staff much more wholly addressed the foresighted design principle and bring more symmetry 104 00:09:33,200 --> 00:09:34,160 to the design. 105 00:09:34,160 --> 00:09:49,420 And for those reasons, the staff recommendation is to adopt Resolution HPC 2025-13 to approve the designer view in the neighborhood conservation district for the construction of a new duplex at 950O in Street, North. 106 00:09:50,060 --> 00:09:50,980 I stand for questions. 107 00:09:51,840 --> 00:09:53,140 questions or staff. 108 00:09:58,720 --> 00:09:59,960 I may ask this of the help. 109 00:10:00,000 --> 00:10:10,040 I'm looking at the north elevation, the front porch should be the facing the street on the left and that seems to be 110 00:10:11,320 --> 00:10:21,000 a much narrower porch maybe than the other, the earlier rendering is, but it's trying to be what's going on there. 111 00:10:22,080 --> 00:10:24,800 Chair, commissioners, I understand the confusion. 112 00:10:25,000 --> 00:10:35,120 The original North Elevation does show pillar with the porch at play there. 113 00:10:35,520 --> 00:10:50,680 The dimensions of the porch are six feet wide by the length of the front, which if I can 114 00:10:50,680 --> 00:11:00,880 26 feet wide, by 26 feet long by six feet wide, that porch is shown in the elevations presented 115 00:11:00,880 --> 00:11:07,760 from the south and the east, but I recognize that it is not present in the north elevation, 116 00:11:07,820 --> 00:11:11,680 and that's something that we would want to see rectified. 117 00:11:13,660 --> 00:11:24,540 And then similarly on the south elevation that the roof on that porch doesn't seem to match the east one. 118 00:11:26,820 --> 00:11:37,400 If we, I've got several issues that are similar, I guess we can bring it up now if that makes sense and then maybe the applicant could respond. 119 00:11:39,520 --> 00:11:46,400 Yeah, this second set of drawings has a lot of inconsistencies that I had trouble understanding. 120 00:11:48,220 --> 00:11:51,280 And one of them is what our chair just described. 121 00:11:53,060 --> 00:11:58,120 Another one at the rear elevation shows what appears to be a hip roof. 122 00:11:58,120 --> 00:12:04,200 And in its side elevation on the south and its north elevation, it's shown as a 123 00:12:04,200 --> 00:12:06,260 gable roof on that garage. 124 00:12:08,420 --> 00:12:15,300 Another inconsistency probably the biggest one is the garage shown on the front 125 00:12:15,300 --> 00:12:23,900 elevation that has grown to one and a half to two-story height, whereas the original 126 00:12:23,900 --> 00:12:25,780 garage was a one-story. 127 00:12:26,520 --> 00:12:32,460 The original one that we looked at looked something like the one on the south elevation, 128 00:12:32,820 --> 00:12:38,800 which is a one story garage where the peak doesn't go any higher than the eve of the two 129 00:12:38,800 --> 00:12:39,800 story beyond it. 130 00:12:39,800 --> 00:12:44,480 But if we look at the front elevation, that peak is well above that roof. 131 00:12:45,100 --> 00:12:50,200 So my problem is the drawings are inconsistent from one drawing to another. 132 00:12:51,720 --> 00:12:57,900 The porch, the sort of open side porch, the chair mentioned on both the front and the back, 133 00:12:58,220 --> 00:13:05,480 also have a different slope in that north elevation, then it's shown in the previous elevations 134 00:13:05,480 --> 00:13:12,480 or in the front elevations. So the slope, as it's shown, of that roof, would run right through the windows 135 00:13:12,480 --> 00:13:18,280 in the front, looking at the front porch, as shown in the north elevation, it would run right through 136 00:13:18,280 --> 00:13:20,120 middle of the windows on the front. 137 00:13:20,780 --> 00:13:22,880 So, you know, some of these are, I'm sure, 138 00:13:24,540 --> 00:13:27,880 inadvertent in consistencies, but I found it difficult 139 00:13:27,880 --> 00:13:30,540 to know what we're really looking at here. 140 00:13:30,540 --> 00:13:33,580 On the south elevation, for instance, 141 00:13:35,080 --> 00:13:38,280 one more thing is the, the, 142 00:13:38,300 --> 00:13:41,460 the rising wall or the dividing wall between the two units, 143 00:13:42,120 --> 00:13:44,700 presumably what happened between those two smaller windows, 144 00:13:45,000 --> 00:13:47,360 we see above, but that would run it right through one of the 145 00:13:47,360 --> 00:13:50,240 the last pains of one of the windows below us. 146 00:13:51,060 --> 00:13:55,100 And finally, the one that probably confuses me as much as anything 147 00:13:55,100 --> 00:13:59,940 as we look at that self-evaluation, the garage is positioned 148 00:13:59,940 --> 00:14:04,680 forward of the main facade of the house. 149 00:14:05,340 --> 00:14:07,520 If you look at the right-hand side of the garage 150 00:14:07,520 --> 00:14:11,660 and the right-hand side of the second-level garage is shown forward 151 00:14:11,660 --> 00:14:16,160 of that, whereas in the original, it was actually about 152 00:14:16,160 --> 00:14:18,320 for a feedback from that corner. 153 00:14:20,020 --> 00:14:26,060 So a lot of inconsistencies that I don't understand, 154 00:14:27,160 --> 00:14:28,620 maybe the applicant can address. 155 00:14:32,470 --> 00:14:34,250 Any other questions for staff? 156 00:14:37,940 --> 00:14:39,600 Do you have anything to add before we? 157 00:14:40,260 --> 00:14:42,060 Chair, Commissioner, there's no at this time. 158 00:14:42,100 --> 00:14:44,880 I don't have anything to add to respond to that, 159 00:14:45,040 --> 00:14:48,220 though I've taken note of all of the comments made thus far. 160 00:14:48,220 --> 00:14:59,900 I think that these questions will be helpful in asking of the applicant when he's ready to present or to speak. 161 00:15:00,000 --> 00:15:00,980 With you all. 162 00:15:03,450 --> 00:15:16,320 I do have one for staff regarding the driveways. This is a very large driveway according to the site plan with two different rages on it. What kind of guidelines do we have for things like that? 163 00:15:17,070 --> 00:15:29,810 Chair commissioners, the city does not have any setback standards for paved surfaces that are not part of the structure. So this driveway could theoretically go right to the property line and that would still be code compliant. 164 00:15:29,810 --> 00:15:39,590 The 12-foot driveway is a fairly standard with that we see with respect to a lot of coverage in the RB district. 165 00:15:40,610 --> 00:15:50,090 By right, any property owner can improve the lot to 25% of structured coverage and 25% of nonstructured coverage. 166 00:15:50,670 --> 00:15:58,250 And both the structured and nonstructured coverage falls well below the 25% threshold for each bucket. 167 00:15:59,810 --> 00:16:04,590 Okay, so I guess I follow up question two, do we have any guidelines for duplexes like this? 168 00:16:05,870 --> 00:16:10,590 Because it does get challenging when you're trying to put it two, two car garages. 169 00:16:11,670 --> 00:16:16,830 And then making them high as well into a site in the neighborhood conservation district. 170 00:16:19,510 --> 00:16:21,530 Chair, commissioners, thank you for the question. 171 00:16:21,530 --> 00:16:29,510 And the standards that we have in place for dueplexes are they must meet the same 172 00:16:29,510 --> 00:16:33,770 dimensional requirements that a one-family residential unit would. 173 00:16:34,730 --> 00:16:43,550 The only distinction in code between the one-and-two-family structures is that the two-family 174 00:16:43,550 --> 00:16:50,590 structure has a minimum lots as of 10,000 square feet, whereas the one-family is 7,500 square 175 00:16:50,590 --> 00:17:03,390 And further, as far as parking provision, each unit must be required to provide one two parking spaces at least one of which must be covered per unit. 176 00:17:04,010 --> 00:17:09,830 Other than that, the dimensional standards as far as setbacks and massing are the same. 177 00:17:10,570 --> 00:17:19,430 Okay, so you're telling me that this house that we're looking at that's two two sides, two houses would fit into one house. 178 00:17:21,250 --> 00:17:25,710 chair commissioners that's correct. You could build this with the exact same 179 00:17:25,710 --> 00:17:30,230 dimensions if it were a one story structure or a one-unit structure. Okay, thank you. 180 00:17:36,180 --> 00:17:42,780 Any other questions for staff? Good. The applicant to come up to the microphone. 181 00:17:44,720 --> 00:17:50,900 There is a button on the left to turn it on. There you go. And I think you can give your name 182 00:17:50,900 --> 00:17:55,360 for the record. My name is John Paul Johnson. Okay, thank you. Thank you guys for taking the 183 00:17:55,360 --> 00:17:58,060 to speak with me and look over this project. 184 00:17:59,140 --> 00:18:03,640 So the first comment I would like to address is the colored rendering in the discrepancies 185 00:18:03,640 --> 00:18:04,860 that we see in there. 186 00:18:05,520 --> 00:18:11,540 So the purpose of that colored rendering tonight was just to give everybody an idea of what 187 00:18:11,540 --> 00:18:17,660 the concept in the color wise, how this unit is going to be finished out. 188 00:18:18,240 --> 00:18:21,080 What we're actually building off of is that updated unit plan. 189 00:18:21,620 --> 00:18:24,880 So this really has nothing to do with how we're going to be building it. 190 00:18:24,880 --> 00:18:26,640 we just wanted to present it forth. 191 00:18:26,840 --> 00:18:30,280 So you guys could see the colors of the building 192 00:18:30,280 --> 00:18:33,160 that we're trying to present to you tonight. 193 00:18:34,120 --> 00:18:36,660 So for those discrepancies, if we go back 194 00:18:36,660 --> 00:18:42,760 to these updated drawings, this is what we're going to be 195 00:18:43,560 --> 00:18:44,700 with, sorry, 196 00:18:46,720 --> 00:18:47,800 yeah, those other drawings. 197 00:18:47,940 --> 00:18:50,700 So the drawings that we just went to, 198 00:18:50,900 --> 00:18:52,640 those are what we're going to be building off 199 00:18:52,640 --> 00:19:00,160 with some additions. As you guys had comments on for the lack of windows, we're addressed. 200 00:19:00,720 --> 00:19:06,560 So in our new updated drawings, we have new ones. By that, you can see we added the windows, 201 00:19:06,740 --> 00:19:14,300 as well as while talking, we noticed that the garage setback was too far front. And as was talked 202 00:19:14,300 --> 00:19:19,420 about earlier today, we moved that back, which allowed us to have a really nice porch inside 203 00:19:19,420 --> 00:19:23,360 in front, which complements the neighborhood really well. 204 00:19:23,920 --> 00:19:31,320 With that we're able to get an extra window on that east elevation, we're able to get 205 00:19:31,320 --> 00:19:37,060 an extra window on the lower level as well as the upper story compared to our first 206 00:19:37,060 --> 00:19:37,480 drawings. 207 00:19:39,160 --> 00:19:48,000 For the impervious covers that we're talking about on the site, this plan takes up 28% of the 208 00:19:48,000 --> 00:19:55,940 But, as you guys require, 25% can be structured in no more than 25% can be non-structured. 209 00:19:56,580 --> 00:19:58,980 So we meet well under those requirements. 210 00:20:00,080 --> 00:20:16,260 So, again, I do apologize for the confusion with this rendering. But this is not what we will be building off of. So, I hope. Yeah, we will be building off of this. So, if you guys have any questions, I would love to answer them or any remarks. 211 00:20:17,280 --> 00:20:23,240 So, I guess I'm a little bit confused as to which drawings were. So, try to go through here. 212 00:20:23,240 --> 00:20:26,020 Yeah, so I don't know if your changes in the other one are working on it. 213 00:20:26,360 --> 00:20:26,800 Yeah, I apologize. 214 00:20:27,540 --> 00:20:34,520 This is different than these are here, and I do have some copies, if you'd like to see them. 215 00:20:35,620 --> 00:20:37,300 But this is very similar. 216 00:20:37,540 --> 00:20:42,760 The only thing I would say is we added some windows to this drawing, and that really is the main 217 00:20:42,760 --> 00:20:45,000 discrepancy between this and what we have here. 218 00:20:52,230 --> 00:20:59,810 So Mr. Chair, if I might, the addition to the packet, the colored version, and the 219 00:20:59,810 --> 00:21:06,830 Yes, primary purpose was to show color and where windows have been planned to be added. 220 00:21:07,290 --> 00:21:07,670 Yeah, structure. 221 00:21:08,490 --> 00:21:09,070 Yeah, yeah. 222 00:21:09,670 --> 00:21:13,290 We put this together very, this color drying. 223 00:21:13,830 --> 00:21:17,510 We noticed in the notes that we received that it would have been helpful to have a colored rendering. 224 00:21:18,330 --> 00:21:20,190 So we tried to put this together. 225 00:21:20,910 --> 00:21:26,670 But again, we can send an updated rendering over from the architects. 226 00:21:26,670 --> 00:21:39,910 This one, unfortunately, does not depict very well how, like the roof is off and obviously I just wanted to show the colors of what this building's gonna look like and how it's gonna fit within the neighborhood. 227 00:21:41,370 --> 00:21:43,010 Okay, thank you. 228 00:21:45,100 --> 00:21:49,360 So on the east elevation, the bottom elevation, 229 00:21:51,480 --> 00:21:54,260 the garage height is misrepresented in the drawing. 230 00:21:54,260 --> 00:21:59,380 We have absolutely. Yes. Great. Thank you. Yes. And I do apologize for that. That's okay. 231 00:22:00,880 --> 00:22:06,500 And in that same elevation, there's a large window now on the first floor, which is a very 232 00:22:06,500 --> 00:22:12,500 welcome addition to the elevation. But I'm looking at the floor plan, and it looks like that's where the furnace room is located. 233 00:22:13,240 --> 00:22:21,740 Is your floor plan changing to get to them? So that's going to be a black out window. So it's actually just going to be. 234 00:22:21,740 --> 00:22:27,000 you won't be able to tell that it is, but yes, okay, so it'll be a window, but it'll have 235 00:22:27,000 --> 00:22:29,860 standroller or something in it that will that is correct, yes. 236 00:22:34,380 --> 00:22:36,880 If we look at the, let's see, 237 00:22:39,750 --> 00:22:45,090 north or I'm sorry, the south elevation, can we assume that those bottom windows are moving around 238 00:22:45,090 --> 00:22:53,130 someone? Yep, that is. Like I'm assuming maybe the right hand one needs to be nearly touching 239 00:22:53,130 --> 00:22:58,530 the garage in order to stay in the right hand unit that is correct. Yeah, after looking at these 240 00:22:59,470 --> 00:23:06,010 drawings that I have here on that self elevation that window will be moved over and then those 241 00:23:06,010 --> 00:23:15,690 two smaller windows will kind of cradle the inside edge of those larger windows. Will the garage be 242 00:23:15,690 --> 00:23:21,670 a gable roof? The rear garage it should say be a gable roof or a hip roof as it shown there. 243 00:23:21,670 --> 00:23:24,590 Yes, there will be a gateware of a table. 244 00:23:25,610 --> 00:23:25,610 Okay. 245 00:23:29,980 --> 00:23:32,960 And so just as a way of clarifying for myself, 246 00:23:33,300 --> 00:23:36,420 if I look at the original submitted drawings, 247 00:23:36,660 --> 00:23:40,520 the non-colored version, these, this is structurally 248 00:23:40,520 --> 00:23:43,420 correct with the exception of some additional windows. 249 00:23:44,160 --> 00:23:44,440 Yes, sir. 250 00:23:44,520 --> 00:23:45,040 That is correct. 251 00:23:45,520 --> 00:23:46,680 Okay. Thank you. 252 00:23:58,120 --> 00:23:59,540 Other questions for the applicant? 253 00:24:05,090 --> 00:24:05,650 Okay. Thank you. 254 00:24:05,810 --> 00:24:08,370 We may call you up again, but I will have a discussion 255 00:24:08,370 --> 00:24:10,370 What commission here? 256 00:24:16,800 --> 00:24:18,760 Reactions from commissioners. 257 00:24:22,270 --> 00:24:23,750 Well, make just a few comments. 258 00:24:24,490 --> 00:24:31,050 It was helpful to hear the corrections, but we would need some 259 00:24:31,050 --> 00:24:34,570 how to have a single set of drawings that shows everything that 260 00:24:34,570 --> 00:24:37,770 would be built. You understand we need to have something to hold and 261 00:24:37,770 --> 00:24:41,910 applicant to and something that we understand will be built. 262 00:24:43,250 --> 00:24:45,690 So one way or the other we're going to need a 263 00:24:45,690 --> 00:24:48,250 the reconciled set of plans. 264 00:24:50,770 --> 00:24:52,130 But that aside, 265 00:24:55,070 --> 00:24:59,970 I appreciate the efforts that were made here to fit this. 266 00:25:00,000 --> 00:25:01,640 The next question is to move on to the next question. 267 00:25:01,640 --> 00:25:05,220 It is a site we have seen before. 268 00:25:06,800 --> 00:25:08,460 And some other efforts on it. 269 00:25:08,900 --> 00:25:14,000 But my biggest concern, I guess, would probably simply be having to 270 00:25:14,000 --> 00:25:16,300 do with its massing and its roof. 271 00:25:18,980 --> 00:25:24,340 Our guidelines talk about the massing and scale of a new building being 272 00:25:24,340 --> 00:25:27,020 compatible with neighboring structures and following the pattern. 273 00:25:27,020 --> 00:25:36,840 It's difficult, I suppose, to have a larger duplex fit, that neighborhood, but the uninterrupted 274 00:25:36,840 --> 00:25:45,400 length of 72 feet on the north side, especially on the south side, it's benefited by a 275 00:25:45,400 --> 00:25:50,940 couple of garages breaking that up somewhat. On the north side is 72 feet, two feet, 276 00:25:50,940 --> 00:25:59,660 two stories tall, and that is something we don't see as a pattern typically in houses. 277 00:26:00,280 --> 00:26:07,040 And we sometimes, when we're looking at a front elevation, like you've done here, that's 278 00:26:07,040 --> 00:26:11,300 not how we really see the house, what we see is a long side and a short side. 279 00:26:11,700 --> 00:26:20,920 So that long side on the north has no break in the roof and no steps of any sort of 280 00:26:20,920 --> 00:26:27,860 that we're leaving that, and that's probably one of the biggest concerns I have is 281 00:26:27,860 --> 00:26:28,840 those two things. 282 00:26:28,920 --> 00:26:34,380 Even in our design guidelines, there's an image that says an inappropriate 283 00:26:34,380 --> 00:26:41,480 infill as when roof horns are not compatible, large and broken slopes, are out of scale 284 00:26:41,480 --> 00:26:49,720 with neighboring buildings, and it seems to me that this has that kind of barracks 285 00:26:49,720 --> 00:26:53,500 like length to it that I find concerning. 286 00:27:02,820 --> 00:27:07,760 Your questions are observations or thoughts of recognition? 287 00:27:09,360 --> 00:27:09,760 I agree. 288 00:27:09,840 --> 00:27:13,580 I think we need more definitive plans before I would ever 289 00:27:13,580 --> 00:27:14,500 approve something. 290 00:27:15,300 --> 00:27:18,180 And I am concerned about the mass of the north and south 291 00:27:18,180 --> 00:27:18,880 sides. 292 00:27:21,190 --> 00:27:24,130 When you're speaking here, maybe there's a way you can 293 00:27:24,130 --> 00:27:29,230 try to break up each unit in either vertically or horizontally, 294 00:27:29,230 --> 00:27:33,550 and that might create some distinction between just the solid 295 00:27:33,550 --> 00:27:38,370 siding all the way down. That might add some, you know, 296 00:27:38,530 --> 00:27:43,150 some additional detail, or it might break up that long side of it too. 297 00:27:49,760 --> 00:27:54,400 I mean, it does seem to, there's a lot of, there's a mix of a lot of window shapes, 298 00:27:54,920 --> 00:27:59,240 like there's four pains in the front, and then two pains in the back, 299 00:27:59,360 --> 00:28:01,620 and then some that look more modern than that. 300 00:28:01,620 --> 00:28:09,640 Some consistency might be good in that and a little more of a traditional look to it to them, especially in those more modern looking windows. 301 00:28:14,580 --> 00:28:18,460 You're speaking of the shape and size of widow page arrangement. 302 00:28:18,600 --> 00:28:19,520 Correct, right. 303 00:28:20,020 --> 00:28:26,440 There's, I mean, there's just a mixture of different types of windows on it, just doesn't seem to have really a cohesive feel. 304 00:28:28,110 --> 00:28:41,970 I agree with Commissioner, I think it'd be a minor change and easily achieved if the front windows are apparently double hung, whether they are, not they have a crossbar that makes them look that way. 305 00:28:42,430 --> 00:28:51,190 It would seem consistent to do that on both sides. We're looking at a corner of a house and we're seeing windows change on each side, the way it is here. 306 00:28:51,190 --> 00:28:58,310 And the traditional pattern would be a similar type of window, and that's pretty much what we asked for in our foresighted design. 307 00:28:58,650 --> 00:29:01,910 But that's a relatively easy thing, I think, to address. 308 00:29:03,170 --> 00:29:07,870 It doesn't affect necessarily the windows dimensions or size or location. 309 00:29:08,250 --> 00:29:10,850 It's more just trying to be more consistent with them. 310 00:29:10,970 --> 00:29:21,170 They could operate as casements if that's your intent, but they could have that additional million that would at least give them the same appearance. 311 00:29:21,170 --> 00:29:22,010 the others. 312 00:29:33,940 --> 00:29:40,360 And I'm just going to pick on to the North Elevation in particular. One of the 313 00:29:40,360 --> 00:29:45,180 suggestions was, is there a way to break that up either, you know, laterally, I guess on the 314 00:29:45,180 --> 00:29:52,300 site so that the two units are somewhat distinct. We do have examples in town of houses that 315 00:29:52,300 --> 00:29:58,320 were an original structure with an addition onto the back that might even achieve a similar length, 316 00:29:58,320 --> 00:29:59,960 but it's very clear that those are... 317 00:30:02,420 --> 00:30:12,100 And I think that would help greatly in not giving this kind of a commercial feel to it. It would give it a more residential feel. 318 00:30:12,620 --> 00:30:16,960 And so that's just I think a consideration that might be well guided. 319 00:30:17,760 --> 00:30:23,020 I agree, and I think it could be as simple as simply offsetting the floor plans, but 320 00:30:23,020 --> 00:30:26,980 I do feed or something like that. You'd have the two roofs just shifting. You would 321 00:30:26,980 --> 00:30:32,660 have that same effect. It would be a relatively minor and relatively inexpensive change, 322 00:30:32,920 --> 00:30:39,740 but it would help meet our guidelines of breaking up large masses and large uninterrupted 323 00:30:39,740 --> 00:30:48,180 roots. Some cities have these very explicit guidelines, I know, of one that says no more 324 00:30:48,180 --> 00:30:54,300 than 16 feet or 32 feet without a two foot job. And glad we don't have these really 325 00:30:54,300 --> 00:31:09,720 prescriptive things, but yet we end up in this sort of situation where we have some more 326 00:31:10,600 --> 00:31:12,820 maybe that's something we can look forward to 327 00:31:12,820 --> 00:31:14,380 correcting in the future. 328 00:31:15,520 --> 00:31:17,340 And as we look at this site plan, 329 00:31:17,500 --> 00:31:20,400 it's pretty clear that there is room on both sides for 330 00:31:20,400 --> 00:31:21,200 lateral movement. 331 00:31:21,600 --> 00:31:24,520 So I don't think that would impede their setback requirements. 332 00:31:25,200 --> 00:31:27,480 I think we're in good shape there. 333 00:31:29,870 --> 00:31:30,730 Question for staff. 334 00:31:32,210 --> 00:31:35,610 Can we have more than one curb cut on a residential property 335 00:31:36,130 --> 00:31:37,290 to serve a duplex? 336 00:31:38,310 --> 00:31:43,610 chair commissioners the city does not have a restriction on number of curb cuts we have 337 00:31:43,610 --> 00:31:50,450 restrictions on width of curb cuts and that is a maximum of 20 feet but there's no limit 338 00:31:50,450 --> 00:31:56,690 on number. The curb cut proposed here is 12 feet wide. 339 00:31:59,250 --> 00:32:00,990 Sorry I just thought of a question 340 00:32:00,990 --> 00:32:05,930 for the applicant and forgive me for not thinking about it sooner but are you planning on any 341 00:32:05,930 --> 00:32:10,930 landscaping for your site, maybe in particular the front. 342 00:32:11,330 --> 00:32:13,290 So I invite the applicant to come back up. 343 00:32:17,630 --> 00:32:18,190 Yeah, yes. 344 00:32:18,430 --> 00:32:21,150 We're going to have landscaping around the whole unit. 345 00:32:23,230 --> 00:32:27,150 It might want to include that too in overall design too. 346 00:32:29,630 --> 00:32:32,170 And since you're here at the podium. 347 00:32:33,190 --> 00:32:36,710 So the plan is to have a chain length fence all the way along. 348 00:32:36,990 --> 00:32:39,470 What is the set of the south side? 349 00:32:39,470 --> 00:32:45,550 And then part of the west side. 350 00:32:45,550 --> 00:32:46,310 Where is that existing? 351 00:32:46,430 --> 00:32:47,270 I think this. 352 00:32:47,610 --> 00:32:48,310 Not existing. 353 00:32:48,830 --> 00:32:49,650 Is that existing? 354 00:32:50,170 --> 00:32:52,410 No, there's going to be no chain length. 355 00:32:52,770 --> 00:32:52,890 Fine. 356 00:32:53,470 --> 00:32:53,670 Okay. 357 00:32:53,890 --> 00:32:56,170 It's shown in the survey site plan. 358 00:32:56,490 --> 00:32:57,650 So I'm just curious. 359 00:32:58,510 --> 00:32:58,590 No. 360 00:33:01,950 --> 00:33:02,870 Oh, yes. 361 00:33:03,130 --> 00:33:04,490 I believe that's the neighbors. 362 00:33:04,810 --> 00:33:05,310 Oh, okay. 363 00:33:05,310 --> 00:33:05,690 The fence. 364 00:33:05,850 --> 00:33:06,190 I apologize. 365 00:33:06,330 --> 00:33:07,610 All right. Thank you. 366 00:33:11,150 --> 00:33:11,670 We'll call you back. 367 00:33:14,430 --> 00:33:14,990 So 368 00:33:17,290 --> 00:33:28,450 I think I'm not hearing support to approve this as it stands that there seem to be some changes that are needed here. 369 00:33:29,510 --> 00:33:32,510 It seems to me to be not quite fully cooked. 370 00:33:33,250 --> 00:33:43,290 You know, we see some inconsistencies in drawings, and I think that there are ways that the site plan and the design in general could be significantly improved. 371 00:33:43,290 --> 00:33:52,290 And I guess I would support tabling for this session in order to give the applicant time to do some further work on. 372 00:33:53,030 --> 00:33:53,050 Okay. 373 00:33:53,050 --> 00:33:54,370 Is that a motion? 374 00:33:56,510 --> 00:33:59,490 Do I like to hear what others think? 375 00:34:00,350 --> 00:34:02,310 I would be supportive of tabling it as well. 376 00:34:02,750 --> 00:34:04,630 And I could make a motion if you don't want to. 377 00:34:04,970 --> 00:34:05,350 Commissioner Holmes. 378 00:34:06,630 --> 00:34:08,530 Well, I'm willing to turn my comment into a motion. 379 00:34:08,530 --> 00:34:15,890 I would move that we table this project for the time being in order to allow the applicant 380 00:34:15,890 --> 00:34:23,290 time to put together a consistent set of drawings and respond to some of the comments relative 381 00:34:23,290 --> 00:34:30,910 to window-type and long-side geometry matching that we've brought up in this meeting. 382 00:34:32,230 --> 00:34:32,810 Is there a second? 383 00:34:33,050 --> 00:34:34,090 I'll make that second. 384 00:34:34,690 --> 00:34:42,070 We have a motion by homes in a second by Hamdahl to table, in this case with some feedback to the applicant. 385 00:34:43,510 --> 00:34:44,370 Is there any other discussion? 386 00:34:46,850 --> 00:34:47,230 Very none. 387 00:34:47,390 --> 00:34:48,850 All those in favor please say aye. 388 00:34:49,230 --> 00:34:49,410 Aye. 389 00:34:50,490 --> 00:34:51,130 Any opposed? 390 00:34:51,890 --> 00:34:52,570 Any abstentions? 391 00:34:53,510 --> 00:34:56,690 The motion passes unanimously to table the project. 392 00:34:57,330 --> 00:34:59,730 I hope we keep working with staff and we can. 393 00:35:00,270 --> 00:35:04,190 Hopefully, see it again sometime soon. Yep. Good night. 394 00:35:05,950 --> 00:35:16,810 So move on then to the next case, which is CD2025-053. Design Review for Newst Gate Arc located adjacent to 395 00:35:16,810 --> 00:35:25,350 a lot of 15 parking lot 15, I think, which is called the Teddy Bear Park parking lot, and turn it over to staff. 396 00:35:26,070 --> 00:35:30,470 Thank you chair. Members of the Commission, my apologies. That is parking lot 15. I got a little 397 00:35:30,470 --> 00:35:35,590 relax with that thinking down town parking commission that's just how we refer to it. 398 00:35:37,070 --> 00:35:42,650 As you'd mentioned, this is a request to locate a skate park, a Json 2 parking lot, 15, 399 00:35:43,550 --> 00:35:45,850 or common term, a teddy bear parking lot. 400 00:35:46,490 --> 00:35:50,550 It's the corner of second in Nelson, also right across the street from teddy bear park. 401 00:35:50,810 --> 00:35:56,150 The city proposes to replace the existing skate park, which has been removed as in early 402 00:35:56,150 --> 00:36:00,530 2025, which was previously in our business part commercial district, by the St. 403 00:36:00,590 --> 00:36:04,770 Query Recreation Center, and also what is commonly referred to as the Brian's 404 00:36:04,770 --> 00:36:05,090 building. 405 00:36:05,990 --> 00:36:09,030 It's in the central, the proposed location is in the central business. 406 00:36:09,710 --> 00:36:15,490 Central, I'm confusing my business, part districts, central, business district, it's in 407 00:36:15,490 --> 00:36:16,830 the downtown design review district. 408 00:36:16,870 --> 00:36:22,490 It is not within the registered commercial district nor is it a registered or listed 409 00:36:22,490 --> 00:36:23,030 structure. 410 00:36:24,110 --> 00:36:28,310 the design partner that our Parks Department and our Parks Commission worked with 411 00:36:28,310 --> 00:36:33,670 this spawn ranch I believe. This site was chosen for redevelopment due to city 412 00:36:33,670 --> 00:36:37,550 ownership of the location. It's current location being informally used as a 413 00:36:37,550 --> 00:36:42,330 skate park in a place for graffiti artists or people who partake will go there 414 00:36:42,330 --> 00:36:47,290 and then just general and I can get into all get into this a little bit later on but 415 00:36:47,290 --> 00:36:52,190 just generally trying to bring a skate park closer to where you see that activity which is 416 00:36:53,550 --> 00:37:03,190 The historic context, I think I would jump to, no, the historic context here is this is the previous site where the gas, where I would jump and I apologize. 417 00:37:03,750 --> 00:37:08,610 It's the previously the northern states power facility where there was a cold gas burning plant. 418 00:37:09,110 --> 00:37:15,550 The circle, the circular area that pad that they're proposing on a redeveloping, was the storage location for that gas. 419 00:37:15,550 --> 00:37:17,910 and it was commonly referred to as a gasoline meter. 420 00:37:19,130 --> 00:37:21,190 The photo provided by the chair earlier on the first 421 00:37:21,190 --> 00:37:23,550 weekend discussing this shows the structure, 422 00:37:23,990 --> 00:37:25,950 unfortunately, just to the left out of frame, 423 00:37:26,090 --> 00:37:28,290 it's where that silo would have been. 424 00:37:29,070 --> 00:37:30,390 I don't believe this one was our net, 425 00:37:30,490 --> 00:37:33,010 but if you look at some older photos of along the Chippewa 426 00:37:33,010 --> 00:37:37,250 River and O'Clayer, there was some very ornate-looking siloes 427 00:37:37,250 --> 00:37:39,770 as what I would infer, kind of, compare them to. 428 00:37:40,010 --> 00:37:42,650 This was a little bit more simple and obviously no longer there. 429 00:37:42,650 --> 00:37:46,710 The request is design review approval from the Heritage Preservation Commission. 430 00:37:47,190 --> 00:37:50,070 It's to establish that purpose-built skate park for downtown. 431 00:37:50,070 --> 00:37:56,510 So a lot of bring the park to where the skaters are rather than have them have to walk all the way 432 00:37:56,510 --> 00:37:58,410 or drive all the way to the business park district. 433 00:37:58,570 --> 00:38:05,450 I think that was an active placement for the, for the Parks Department and our, I should say, park commission, as well as city council. 434 00:38:06,390 --> 00:38:12,530 It's replacing an aging outdated facility, which was the oldest skate park providing recreational amenities to both skaters. 435 00:38:12,530 --> 00:38:18,410 and then generally just spectators kind of using that space for just activation for the city. 436 00:38:19,150 --> 00:38:23,610 And the HBC is seeing this because it is a public project that is happening within a designer view crate. 437 00:38:24,010 --> 00:38:32,710 That designer view area is not necessarily, it's not, it's current is per code required to see 438 00:38:32,710 --> 00:38:34,930 because it's a public facility in a designer view. 439 00:38:34,930 --> 00:38:41,850 in itself, it doesn't have as much, let's say, historic relevance beyond just what the pad 440 00:38:41,850 --> 00:38:47,350 was there or what used to be there today, as far as structural integrity. The design features 441 00:38:47,350 --> 00:38:52,710 for the park, this was fun for me to write in there. If I'm being candid, it was, I enjoyed saying 442 00:38:52,710 --> 00:38:57,050 things like quarter pipes, ledges, stairs, rails, wall rides, because they weren't hit, 443 00:38:57,050 --> 00:39:02,310 gabled, answered, I just thought that was kind of different for you all to see. 444 00:39:03,230 --> 00:39:06,110 Did any of you all know what those were when you read them? 445 00:39:06,350 --> 00:39:07,590 No, yes. 446 00:39:08,970 --> 00:39:13,330 So that's a general escape park, proposed to be the same location in size of the existing 447 00:39:13,330 --> 00:39:18,850 pad there today, so they're not making it much larger than any of the existing circular area. 448 00:39:19,190 --> 00:39:23,810 There will be some bumpouts where there's going to be spots for benches or any of the other 449 00:39:23,810 --> 00:39:25,330 amenities that skaters would use. 450 00:39:25,790 --> 00:39:29,230 The existing retaining wall that's there that you're probably aware of is proposed to remain 451 00:39:29,230 --> 00:39:32,810 there, the public works department would not want to replace that, but I think it would 452 00:39:32,810 --> 00:39:37,250 want to be a beneficial feature, and to just not worth their time to do it serving a function 453 00:39:37,250 --> 00:39:43,990 today. As mentioned, the former Civil War Gas Light Company and SP had the site from 1880s 454 00:39:43,990 --> 00:39:50,090 to the 1950s. In the 1960s, this is my biggest update for you all. There was remediation of the site, 455 00:39:50,350 --> 00:39:55,050 and if you've gone down to that site today, or maybe even starting Monday, you'll notice that 456 00:39:55,050 --> 00:39:57,010 there's quite a bit of earth tore up. 457 00:39:57,170 --> 00:39:59,190 When an Excel discovered that we were, 458 00:39:59,290 --> 00:39:59,970 or when they found out Earth. 459 00:40:00,000 --> 00:40:06,080 We are working on this. They wanted to go back and do testing of the remediation to ensure that it was actually done appropriately. 460 00:40:06,900 --> 00:40:13,480 So they did remove that pad that was there earlier to make sure that it was remediated appropriately in the 60s and 70s and are testing it now. 461 00:40:13,760 --> 00:40:20,480 To my knowledge, it's not necessarily remediation that is happening, but testing to ensure it was done and is safe for use. 462 00:40:20,540 --> 00:40:25,300 And that goes for the entire site. I think that's including the parking lot too. It isn't just this location. 463 00:40:26,500 --> 00:40:30,540 So it's kind of, I'd say, an added public safety benefit to this project. 464 00:40:32,240 --> 00:40:35,620 Ultimately, from Saps Respected, there isn't remaining historic structure. 465 00:40:36,240 --> 00:40:40,460 The pad itself would lack the confirmed historical integrity of what was there, 466 00:40:40,520 --> 00:40:44,740 and that might be the last remaining historic structure that we could say that was there. 467 00:40:46,020 --> 00:40:49,440 Looking at preservation considerations, the site's not within a listed historic district. 468 00:40:49,680 --> 00:40:54,320 It isn't listed itself. There's an issue overview required for it. 469 00:40:54,320 --> 00:40:58,920 Ultimately, staff does find it's compatible with the downtown design, as well as character 470 00:40:58,920 --> 00:41:04,300 and represents positive activation for that site today, and I think aligns with a lot of 471 00:41:04,300 --> 00:41:06,600 our downtown goals as well. 472 00:41:06,980 --> 00:41:11,920 And just general public activity goals. 473 00:41:12,520 --> 00:41:17,360 This is a site plan of what they're using, so you can kind of see that pad that's about 474 00:41:17,360 --> 00:41:18,040 the same size. 475 00:41:18,160 --> 00:41:21,660 There's another one in your packet that had it overlaid to the actual pad. 476 00:41:21,660 --> 00:41:33,940 Here's some renderings of what that would look like with all of the, I would say, architectural features from a skate park like your, um, I think my favorites to the hub, I think in the middle I just like saying that. 477 00:41:34,660 --> 00:41:36,720 Um, then here's an overview of that site as well. 478 00:41:38,120 --> 00:41:48,580 I'll tell you later, staff, staff recommendation is approval of the HVC Resolution 2025 14 to approve the design review and I will stand for any questions. Thank you. 479 00:41:52,130 --> 00:41:53,810 Thank you. Are the questions for staff? 480 00:41:57,760 --> 00:42:04,280 I have just kind of a big question for all of us and staff included and that's just a dressing. 481 00:42:05,140 --> 00:42:11,640 And this is again maybe something that we can try to do a better job with our, with our design codes. 482 00:42:12,260 --> 00:42:21,420 But I think there's been a few times when we've been not in agreement with something that needed to be reviewed by the HPC. 483 00:42:21,420 --> 00:42:29,040 And in your report, you know, the projects of this nature are not typically subject to the standard design review guidelines. 484 00:42:32,240 --> 00:42:40,340 So, do we have any kind of a more concise definition of what isn't, isn't to come before us? 485 00:42:40,340 --> 00:42:43,460 And if not, then I think that's maybe something we should work toward. 486 00:42:43,460 --> 00:42:49,280 So that, you know, there isn't any ambiguity that we can have. 487 00:42:50,180 --> 00:42:56,180 The, what I, you know, I know this isn't the building, so that's pretty much one reason 488 00:42:56,180 --> 00:42:58,880 that it might fall into that ambiguous area. 489 00:42:59,480 --> 00:43:05,100 On the other hand, we've got all kinds of things in our, in our code about the cultural resources 490 00:43:06,500 --> 00:43:12,540 and we've reviewed retaining walls, we've reviewed things that have far less impact 491 00:43:12,540 --> 00:43:14,560 on our city than this. 492 00:43:15,260 --> 00:43:19,240 So, and really if you look at design review process, 493 00:43:19,500 --> 00:43:22,180 it says the whole purpose of it is to ensure building 494 00:43:22,180 --> 00:43:25,340 and site development, design complement the character 495 00:43:25,340 --> 00:43:28,860 and integrity of still waters, neighborhood commercial districts, 496 00:43:29,680 --> 00:43:31,540 including the buildings, the streetscape, 497 00:43:31,680 --> 00:43:32,760 and the natural environment. 498 00:43:33,080 --> 00:43:36,020 So I think there are things besides buildings 499 00:43:36,020 --> 00:43:42,520 that rightly fall in the design review guideline under our review 500 00:43:42,520 --> 00:43:44,560 And I just think it would be good. 501 00:43:44,700 --> 00:43:46,180 I don't know if you have an answer. 502 00:43:46,340 --> 00:43:49,700 If it's more of a, we've got to work on it kind of a thing. 503 00:43:50,140 --> 00:43:52,540 Commission chair commissioners, it could be a little bit of both. 504 00:43:52,620 --> 00:43:55,780 I can definitely say code does require because it's a public project 505 00:43:55,780 --> 00:43:57,380 in the design and redistrict. 506 00:43:57,580 --> 00:43:59,260 HBC gets the crack at it right away. 507 00:43:59,380 --> 00:44:04,520 And to your point, there are things on here that, again, retaining walls. 508 00:44:04,720 --> 00:44:06,860 I think the commission actually reviewed the retaining wall 509 00:44:06,860 --> 00:44:11,180 replace minutes shown in this rendering here maybe two or three years ago. 510 00:44:11,180 --> 00:44:15,740 So definitely something that is warrant of your review, in this case, from Saph's perspective 511 00:44:15,740 --> 00:44:21,100 for this particular instance, looking back at the older photo of any historic integrity 512 00:44:21,100 --> 00:44:27,120 that was on this site is now primarily steep slope, so natural environment, or parking lot. 513 00:44:27,420 --> 00:44:31,720 And so what used to be there, the cultural resource from Saph's perspective is mostly gone, 514 00:44:32,040 --> 00:44:35,340 but that is definitely another aspect that I think the HPC would review this for. 515 00:44:35,640 --> 00:44:39,260 So it's a little bit of both that this is within your purview because code requires that it's 516 00:44:39,260 --> 00:44:43,540 design review district is the site itself that's going to be impacting downtown. 517 00:44:44,600 --> 00:44:48,420 It just, I think I might have worded that staff reporting a little confusing. 518 00:44:49,700 --> 00:44:53,220 It's, I don't know what it is for the HVC to review this as it's not a structure, but it 519 00:44:53,220 --> 00:44:54,300 is not unwarranted. 520 00:44:54,660 --> 00:44:55,520 Is that only a warranted review? 521 00:44:59,380 --> 00:44:59,860 Yeah. 522 00:45:00,000 --> 00:45:07,000 I guess my only question is, is there a bit of overreach here to include a bank to slap a ledge or a grind ledge and a hub a ledge? 523 00:45:07,940 --> 00:45:11,420 I'm just not persuaded that that's, you know, necessary. 524 00:45:12,260 --> 00:45:14,300 Too many lights, too many lights. 525 00:45:19,550 --> 00:45:22,070 So we're noting too many ledges for the commission. 526 00:45:25,390 --> 00:45:33,290 I would agree with what Commissioner Larson said, you know, we've, we've, sometimes these public projects come to us 527 00:45:33,290 --> 00:45:39,850 and they're pretty far down the road of design and they definitely do have an impact and 528 00:45:39,850 --> 00:45:46,450 do relate to the kinds of things that we are looking to to reveal with a downtown designer 529 00:45:46,450 --> 00:45:50,590 view district even if they don't have historic buildings that are being altered. 530 00:45:52,090 --> 00:45:59,090 In this one, I do think that that backwall probably dates from those 200 gas company era. 531 00:45:59,190 --> 00:46:02,290 I'm not sure, you know, I think somebody would have to look into that. 532 00:46:02,290 --> 00:46:06,730 I don't think we even need to look into that since it sounds like it's not going to be altered. 533 00:46:07,150 --> 00:46:17,390 And if I'm understanding this one of the things I was wondering is that in this rendering it appears to have some sort of a texture applied to it. 534 00:46:18,170 --> 00:46:21,250 But perhaps that's just how it came out of a computer. 535 00:46:21,950 --> 00:46:23,270 Chair commissioners, that is okay. 536 00:46:23,530 --> 00:46:28,230 I did ask our deputy public works director about that. 537 00:46:28,230 --> 00:46:34,690 are you playing or placing it, repairing it, what are you going to do? And their goal is actually to leave it as much intact as it is today. 538 00:46:35,070 --> 00:46:43,210 There's obviously some to Commissioner Summers points. Maybe there is pervute here. They are planning and using it as a wall, right? 539 00:46:43,270 --> 00:46:47,810 So literally using that infrastructure as part of the skate park itself, so they don't want to remove it. 540 00:46:47,990 --> 00:46:54,010 I also think that another goal that the Public Works Director mentioned, well not an organized effort. 541 00:46:54,010 --> 00:46:57,410 As if you've been back there, you'll notice there's a lot of graffiti and taking. 542 00:46:58,710 --> 00:47:03,950 There isn't an active program to remove that now, and I don't think that they're going 543 00:47:03,950 --> 00:47:05,570 to actively want to remove it in the future. 544 00:47:05,710 --> 00:47:10,370 In fact, there might be some sort of encouragement to use that space rather than other infrastructure 545 00:47:10,370 --> 00:47:11,570 throughout downtown. 546 00:47:12,370 --> 00:47:19,070 So, it really is an attempt to, from kind of a public, more public side of things, to bring 547 00:47:19,070 --> 00:47:22,910 the skateboard park to the skaters, where they're likely downtown, and also some of those 548 00:47:22,910 --> 00:47:26,650 or attractive nuisances, go use that wall instead of another one. 549 00:47:27,650 --> 00:47:29,850 And I do want to apologize for the tardiness on this. 550 00:47:29,890 --> 00:47:31,010 I think it was the chair that mentioned. 551 00:47:31,170 --> 00:47:32,970 I didn't even know it was happening all of a sudden. 552 00:47:33,150 --> 00:47:36,750 There was a small yard science with this proposal on it. 553 00:47:36,870 --> 00:47:38,330 And I didn't know that was there. 554 00:47:41,510 --> 00:47:42,770 Question for somebody. 555 00:47:43,330 --> 00:47:44,910 Mr. McRolley knows this better than I do. 556 00:47:44,970 --> 00:47:52,150 But is there some way to just wear that new, those new ramps kind of, 557 00:47:52,150 --> 00:47:59,730 up against the the original walls, there's some sort of narrow separating material that could 558 00:47:59,730 --> 00:48:07,390 keep the new concrete from physically attaching to the to the old wall. If that's possible, 559 00:48:07,630 --> 00:48:12,830 that might make it theoretically reversible if the design changes are the escape arc changes 560 00:48:12,830 --> 00:48:20,670 or something else in the future is in that spot. Chair commissioners, if I'm understanding looking 561 00:48:20,670 --> 00:48:28,990 for a way so that if the fist is constructed as shown they're likely not penetrating the 562 00:48:28,990 --> 00:48:34,070 wall the existing wall that I put rebar in and other kind of building it alongside it 563 00:48:34,070 --> 00:48:38,650 but close enough we're still function but also far enough a way that it's removable or 564 00:48:38,650 --> 00:48:45,150 if demoed that doesn't impact the integrity of that wall a common detail would be to have an 565 00:48:45,150 --> 00:48:49,970 extension material between the existing and the new just to make sure there was a bond break there 566 00:48:49,970 --> 00:48:51,290 OK, what's going to happen? 567 00:48:51,610 --> 00:48:54,190 OK, so if that expansion material serves 568 00:48:54,190 --> 00:48:58,770 that purpose, then I think would be a good thing for a few reasons. 569 00:49:02,720 --> 00:49:05,620 I just have a couple of thoughts, and since we're reviewing it, 570 00:49:06,140 --> 00:49:08,680 and looking at it, and it's surrounding landscape. 571 00:49:10,180 --> 00:49:13,680 So I look at this, and I look at the teddy bear park. 572 00:49:14,220 --> 00:49:19,260 And I think of what are the design elements of teddy bear park, 573 00:49:19,320 --> 00:49:21,400 and what are the design elements of this? 574 00:49:21,400 --> 00:49:32,900 And I think one thing that stood out to me between this one and between the park is just the, you know, 575 00:49:33,020 --> 00:49:42,300 well, one, the concrete, it doesn't appear to be dyed at all. And you know, might be, you know, 576 00:49:42,440 --> 00:49:48,860 might we consider a dye that's either kind of a cream or more of a reddish brick, like the 577 00:49:48,860 --> 00:49:51,380 levers are in teddy bear park, 578 00:49:53,760 --> 00:49:57,660 you know, just so it doesn't have that, you know, that 579 00:49:57,660 --> 00:49:59,960 vast expanse of unfinished, you know. 580 00:50:00,000 --> 00:50:09,100 Now I finish concrete look. Are the ways we can incorporate some color into this, some, you know, 581 00:50:09,260 --> 00:50:16,020 some colors that we traditionally see in downtown. That's, that was my one dot on this. 582 00:50:16,280 --> 00:50:25,600 And then also going back to that while I think it's worth the city having conversations about what to do with that long term. 583 00:50:25,600 --> 00:50:33,060 because if it's going to remain a blank while I can almost guarantee that there will be a continuous 584 00:50:33,060 --> 00:50:40,920 issue with taking. And so my, you know, my thought isn't and maybe not all of the commissioners 585 00:50:40,920 --> 00:50:48,000 will agree with this, but perhaps look at that as a potential public arts face as well to try to 586 00:50:49,480 --> 00:50:51,560 proactively mitigate that issue. 587 00:50:55,440 --> 00:50:56,520 We just call it a mirror. 588 00:50:59,760 --> 00:51:07,780 I understand from what you were saying earlier, question for staff, that kind of the intent is that it remain 589 00:51:07,780 --> 00:51:09,700 out, be taking surface. 590 00:51:10,360 --> 00:51:11,620 Chair, commissioners, that is correct. 591 00:51:12,260 --> 00:51:18,060 I will say, I think that's a comment that we can definitely pass along to the public works 592 00:51:18,060 --> 00:51:24,040 staff and also the applicants or I'd say the consultants that we're working with the public 593 00:51:24,040 --> 00:51:29,360 work staff, but essentially the plan is to kind of leave it, it appears to be doing an effective 594 00:51:29,360 --> 00:51:35,880 job of being tagged and leave it that way. I don't think there's any, I don't think there's 595 00:51:35,880 --> 00:51:40,640 any request from PD or public works to go out there and paint it now and I don't think they intend 596 00:51:40,640 --> 00:51:45,320 to either, I'm going to go on on a limb and say if there's obviously clearly offensive art 597 00:51:45,320 --> 00:51:50,780 or work they would probably go out there, but I think they want to use it to attract that 598 00:51:50,780 --> 00:51:52,820 since rather than repel it. 599 00:51:55,120 --> 00:51:57,200 And then as for the dying, I think that's a really good comment. 600 00:51:57,460 --> 00:52:00,240 I'm looking at Google Street or Google Aerial. 601 00:52:00,420 --> 00:52:02,320 It looks almost red compared to definitely 602 00:52:02,320 --> 00:52:04,460 on the sun, catches Teddy Bear Park's parking lot 603 00:52:04,460 --> 00:52:06,700 or not parking lot, but the walkway 604 00:52:06,700 --> 00:52:07,640 it definitely looks red. 605 00:52:07,860 --> 00:52:11,260 And so I can see they're being, if it is just this clean 606 00:52:11,260 --> 00:52:14,320 of a concrete, while that might look good in a vacuum, 607 00:52:14,620 --> 00:52:18,060 I could see that being very different from across the street. 608 00:52:20,870 --> 00:52:22,490 I mean, I know it looks, sorry. 609 00:52:22,490 --> 00:52:29,850 It looks like the teddy bear park uses a kind of combination of some reddish tint and some tan it as well. 610 00:52:29,850 --> 00:52:30,430 Well, 611 00:52:38,090 --> 00:52:44,950 I had walked out on the site just recently and they're well under way demolishing everything. 612 00:52:45,290 --> 00:52:47,070 So most of the concrete's gone. 613 00:52:49,350 --> 00:52:52,150 Just two thoughts in it. 614 00:52:52,210 --> 00:52:58,390 These are probably not HPC realm comments, but just throw them out there again. 615 00:52:59,030 --> 00:53:03,990 Because we have it in front of us, and one would be just concerns the safety at the top 616 00:53:03,990 --> 00:53:04,510 of the wall. 617 00:53:04,770 --> 00:53:12,730 There's an existing barboyer top fence that moves along Chilcoot and probably does a pretty 618 00:53:12,730 --> 00:53:18,670 good job, doesn't show up in any of these drawings and assuming if that area at the top 619 00:53:18,670 --> 00:53:25,190 of the wall is accessible with this additional activity would be good to make sure we have 620 00:53:25,190 --> 00:53:28,690 kind of a fall protection at the top of the wall. 621 00:53:29,290 --> 00:53:36,930 And the other is really the way you enter and exit the site that just kind of struck me 622 00:53:36,930 --> 00:53:45,680 as maybe not the best way because it doesn't take you out of the site before you get to 623 00:53:45,680 --> 00:53:56,660 crosswalk at Teddy Bear, the park, so right there, that's a extremely steep slope right 624 00:53:56,660 --> 00:54:02,360 at that entrance point. It looks nice but there's no doubt that if you've got on that 625 00:54:02,360 --> 00:54:06,920 and you have a board over your shoulder you probably will get on it and go down it brings you 626 00:54:06,920 --> 00:54:15,200 to that intersection and I just questioned whether it wouldn't make some sense to bring the 627 00:54:15,200 --> 00:54:21,420 entrance in at the parking lot, maybe move us all over if need be handicapped, saw there's 628 00:54:21,420 --> 00:54:31,860 plenty of room. It's just, my concern is giving almost, well, giving access to 629 00:54:31,860 --> 00:54:36,820 Chilkut where it never had it before. And it's at a steep slope and not an ideal place. 630 00:54:36,940 --> 00:54:43,140 Ideally, you would come out at a street intersection that's marked rather than 20 feet up the hill 631 00:54:43,140 --> 00:54:45,140 on a steep slope from that intersection, 632 00:54:47,340 --> 00:54:50,520 but that's something if you could pass, most of 633 00:54:50,520 --> 00:54:55,520 these drawings just sort of cut us off before we get to that point, but that was my 634 00:54:55,520 --> 00:54:56,340 turned it. 635 00:55:11,600 --> 00:55:12,980 Any further thoughts? 636 00:55:15,100 --> 00:55:41,540 And my correct one we're looking for a motion to approve or I can't get the package here. There's a resolution in here. That has just one condition of approval right now. Is there anything based on what we've heard here tonight? Is there support to approve it? 637 00:55:41,540 --> 00:55:48,700 As is, or with some conditions, or ask for those things you've all mentioned to be considered 638 00:55:48,700 --> 00:55:49,700 in broad back. 639 00:55:49,840 --> 00:55:51,740 I guess there are probably three options here. 640 00:56:03,120 --> 00:56:06,620 I'm looking at the proposed resolution and the package. 641 00:56:09,300 --> 00:56:14,460 And the condition of approval, the designs, she'll be consistent with those unfile 642 00:56:14,460 --> 00:56:17,900 for the slate, roof, mimicking metal roof. 643 00:56:18,880 --> 00:56:19,480 Is that it? 644 00:56:19,480 --> 00:56:21,140 That is a typo commissioners. 645 00:56:21,140 --> 00:56:22,660 It seems like a wrong condition. 646 00:56:23,360 --> 00:56:23,580 Okay. 647 00:56:24,000 --> 00:56:26,000 Just wanted to make sure I was reading that correctly. 648 00:56:27,920 --> 00:56:32,400 We'll make sure to update that that proposed plans are consistent with those on file for the skatepark. 649 00:56:32,400 --> 00:56:32,880 I apologize. 650 00:56:33,620 --> 00:56:34,020 So what? 651 00:56:34,300 --> 00:56:35,640 So is there a condition of approval? 652 00:56:35,900 --> 00:56:36,260 I don't know. 653 00:56:36,300 --> 00:56:39,560 That would be the standard condition that it's consistent with what it's before you hear. 654 00:56:39,580 --> 00:56:39,960 Okay. 655 00:56:40,280 --> 00:56:41,380 Thank you. 656 00:56:45,300 --> 00:56:46,840 The earlier condition that's sad for it. 657 00:56:46,900 --> 00:56:50,500 It sounded like there was a lot of good comments that we broke down that will definitely be passing along. 658 00:56:50,500 --> 00:56:56,600 think one more designer view or kind of consistent with the neighborhood area or the site itself 659 00:56:56,600 --> 00:57:01,400 was the pigmentation of the concrete and that's something that we could... I admittedly 660 00:57:01,400 --> 00:57:05,100 I'm not familiar with how skate parks are constructed if that's something they can do. 661 00:57:05,220 --> 00:57:08,880 I've seen different colored ones, but it's definitely something we could add as a condition for them to 662 00:57:08,880 --> 00:57:09,300 explore. 663 00:57:11,960 --> 00:57:19,040 And I would point to finding see there, which is that, you know, that would potentially 664 00:57:19,040 --> 00:57:23,800 negatively alter the essential character of that space, that expansive gray 665 00:57:23,800 --> 00:57:24,160 concrete. 666 00:57:40,280 --> 00:57:43,560 I think this is a really good use in this location. I think it's 667 00:57:43,560 --> 00:57:48,980 cleverly cited. I think it's adjacent seat of Teddy Bear Park is kind of ironic and 668 00:57:50,020 --> 00:57:54,740 and fun. Little kids big kids. I don't know that I care very much about this 669 00:57:54,740 --> 00:57:58,240 inconsistency between the two. They're so very different in use and everything else 670 00:57:59,500 --> 00:58:04,120 that I'm less concerned about that. I am concerned from a safety standpoint and 671 00:58:04,120 --> 00:58:08,660 this effect, the designers parse this as well, just when people come out of this skate park 672 00:58:08,660 --> 00:58:15,080 on skateboards, they're immediately given a steep slope to come down and that seems to me 673 00:58:15,080 --> 00:58:21,300 to be a recipe for some conflict there, but strollers crossing from the parking lot to teddy bear 674 00:58:21,300 --> 00:58:26,000 and cars coming down, fill a code and bike coming out, fill a code and it would be safer. 675 00:58:26,240 --> 00:58:30,100 It seems to me if it was a stairway down onto the parking lot itself rather than a sidewalk 676 00:58:30,100 --> 00:58:38,260 that went down at a steep slope. So I guess I support a motion to approve with the condition 677 00:58:38,260 --> 00:58:45,340 that they evaluate a different entry location, not that it had a different entry location, 678 00:58:45,620 --> 00:58:47,520 but that they take time to evaluate that. 679 00:58:50,390 --> 00:58:53,290 You have a motion? I would second that motion. 680 00:58:53,730 --> 00:58:58,850 I do have concerns to about the safety of the site, so I think that should definitely be looked at. 681 00:58:58,850 --> 00:59:04,750 motion by home, second by me, you know, my I agree with with that as well and 682 00:59:04,750 --> 00:59:10,570 Jilakud is so narrow and and so Daisy half the time, the cars and pedestrians and 683 00:59:10,570 --> 00:59:16,250 everything else that I think it would be wise to not have another element to have mixed. 684 00:59:19,460 --> 00:59:26,920 I'd maybe add another from the amendment to just encourage the city to continue exploring 685 00:59:26,920 --> 00:59:30,560 the feasibility of public art with artists and community partners. 686 00:59:30,560 --> 00:59:31,980 Yes, let's base. 687 00:59:34,520 --> 00:59:35,860 I would be too. 688 00:59:35,860 --> 00:59:36,720 I would be too. 689 00:59:37,480 --> 00:59:42,520 Friendly amendment was accepted by both of the commissioners the original in the second. 690 00:59:43,840 --> 00:59:56,680 So we have, I believe we have as the motion in the packets with the corrective standard condition that plans to be consistent with those on fire in the community development department except as modified here in. 691 00:59:56,680 --> 00:59:58,840 condition to 692 01:00:00,000 --> 01:00:14,380 Explore, having the entrance be through the park for greater safety or through the parking lot, for greater safety, and then a condition to consider public art on that wall. 693 01:00:19,220 --> 01:00:20,260 Anything else? 694 01:00:22,270 --> 01:00:25,510 Okay, well then all those in favour, please say aye. 695 01:00:25,550 --> 01:00:28,950 Aye. Aye. Aye. Any opposed? Any abstentions? 696 01:00:29,590 --> 01:00:35,470 Okay. The motion passing unanimously unanimously to grant design approval with those conditions. 697 01:00:37,630 --> 01:00:39,910 So moving on down the list. 698 01:00:40,410 --> 01:00:44,130 I think we've got a computer calendar is kind of question here. 699 01:00:45,610 --> 01:00:47,170 So I will turn it over to Smith. 700 01:00:47,430 --> 01:00:51,450 Chair, commissioners, I might, if you're all right, do a little bit of a reverse order on the staff. 701 01:00:51,450 --> 01:00:54,670 update so we can end with a little bit of fun discussion on comparing calendars. 702 01:00:55,450 --> 01:00:57,410 I'll start with number five. 703 01:00:57,450 --> 01:01:01,430 A subcommittee for designer view guidelines has been chosen so we do have three of our great 704 01:01:01,430 --> 01:01:02,950 commissioners up here. They're on a subcommittee. 705 01:01:03,550 --> 01:01:07,170 Subcommittee to look at our designer view guidelines and just red line them. Again, it's not 706 01:01:07,170 --> 01:01:12,970 very large changes just looking at where there can be updates minor tweaks here to just improve 707 01:01:12,970 --> 01:01:19,230 the design guidelines not looking at each section and trying to update the entire section individually. 708 01:01:20,550 --> 01:01:25,190 A reminder of 2020-26 Commission calendars, there is a draft of those for looking at next year. 709 01:01:25,610 --> 01:01:30,910 And the only update I have for that is similar to what we experienced this month and next month, 710 01:01:31,570 --> 01:01:35,470 where HPC and a subsequently planning commission will be moved up a week. 711 01:01:35,790 --> 01:01:42,350 So looking into 2020-26, I just wanted to give you all a year heads up that we're going to have early meetings. 712 01:01:42,450 --> 01:01:47,350 And November December, we will be reminding you, but otherwise everything else is looking consistent 713 01:01:47,350 --> 01:01:53,370 and with next year's calendars, an update on last week's City Council meeting. 714 01:01:53,790 --> 01:02:01,510 220 Murdoch Street was the appeal was upheld by the City Council kind of in half. 715 01:02:02,130 --> 01:02:07,770 So the City Council did ultimately save determined that there was enough information to determine 716 01:02:07,770 --> 01:02:12,830 replacement was warranted over repair for the, and I should back up to 220 Murdoch Street 717 01:02:12,830 --> 01:02:19,030 the old post office site, Rearof, the air in the resolution earlier for the site roof. 718 01:02:19,670 --> 01:02:25,610 The Council did determine that replacement was appropriate over repair, but they did ask and 719 01:02:25,610 --> 01:02:32,250 direct the applicant to return to the HPC. Right now, we're looking at December to discuss 720 01:02:32,250 --> 01:02:37,350 the appropriate materials. I've been working with our staff and pigeon to request more information 721 01:02:37,350 --> 01:02:41,910 beyond the scopes and quotes that have been submitted to you thus far to ensure you have 722 01:02:41,910 --> 01:02:48,730 information to make that decision. So that'll be coming back and at this time the appeal that was, 723 01:02:48,730 --> 01:02:54,390 it was an appeal to the denial that was from HBC. The Council of Return of the Appeal proved 724 01:02:54,390 --> 01:02:59,610 for placement but have sent the applicant back to the HBC to discuss materials. So I'll just 725 01:02:59,610 --> 01:03:05,950 want to let you know that that will be coming up here in December most likely. Does that restart 726 01:03:05,950 --> 01:03:11,270 the clerk on the case? It does not. So they do. That's something that I double check with our city attorney. 727 01:03:11,270 --> 01:03:13,190 it does not appear to reset the clock. 728 01:03:13,450 --> 01:03:15,570 This is technically the appeal period. 729 01:03:16,190 --> 01:03:18,090 So even when we have that 60 days, 730 01:03:18,470 --> 01:03:20,670 what something that it's safe just finding out as well 731 01:03:20,670 --> 01:03:23,630 is you have those 60 days to make or take action. 732 01:03:24,010 --> 01:03:25,490 And that includes that appeal period. 733 01:03:25,710 --> 01:03:27,650 So we have extended it to the full 120. 734 01:03:28,050 --> 01:03:29,390 So I believe that brings us into, 735 01:03:29,730 --> 01:03:32,650 I can pull this up, but I believe that will bring us 736 01:03:32,650 --> 01:03:33,590 into early January. 737 01:03:35,530 --> 01:03:37,110 I know commission has done some research. 738 01:03:37,330 --> 01:03:39,870 Do you need any additional info about materials? 739 01:03:39,870 --> 01:03:49,490 Are roofing that would be approval by us at this point? Not not as much, but I appreciate that what we're looking for from the applicant is if there's a 740 01:03:49,490 --> 01:03:55,610 What I believe it will be seeking from our conversations is that they're going to propose a specific project or product 741 01:03:55,610 --> 01:04:02,470 We are going to seek information how that's going to be a fix. How it's going to impact the the cornices, the dormers, the windows, the skylights 742 01:04:03,810 --> 01:04:09,330 Because they're likely not going to be seeking to replace it with slate, which is a product. We know for that roof 743 01:04:09,330 --> 01:04:13,010 know what it looks like, how it's going to be installed. If it was like for like replacement, 744 01:04:13,230 --> 01:04:17,990 it would likely be an easier review for the commission, because it's likely not going to be. 745 01:04:18,010 --> 01:04:22,110 I'd like for like replacement, we're going to be asking for much more information on how that 746 01:04:22,110 --> 01:04:27,790 material is going to be operating on that roof, because it's foreign to that roof. That's something 747 01:04:27,790 --> 01:04:30,750 that we were just speaking with our consultants with earlier today. 748 01:04:33,890 --> 01:04:35,810 And then I do the last two 749 01:04:35,810 --> 01:04:37,610 are a little bit less ones an update. 750 01:04:37,970 --> 01:04:41,110 Preservation awards were not had in October, November, 751 01:04:41,270 --> 01:04:43,290 but we are going to be getting them ready 752 01:04:43,290 --> 01:04:45,910 for the new year into the for 2026. 753 01:04:46,430 --> 01:04:48,550 So what I'll be asking all of the commissioners here to do 754 01:04:48,550 --> 01:04:49,890 is between now and December. 755 01:04:50,930 --> 01:04:53,290 Please look back or look at some projects 756 01:04:53,290 --> 01:04:54,250 that were done around the city 757 01:04:54,250 --> 01:04:56,370 and send us some addresses and sites 758 01:04:56,370 --> 01:04:59,110 for those that you think would be really good candidates 759 01:04:59,110 --> 01:04:59,850 for preservation. 760 01:05:00,000 --> 01:05:00,120 We'll go to two or three minutes before the next decide. 761 01:05:00,120 --> 01:05:00,520 The question is, basically, depending on the situation, the 2017 decision would be 762 01:05:00,520 --> 01:05:01,600 for the 2020 decision. 763 01:05:04,840 --> 01:05:11,000 The decision was between two and only two months ago. 764 01:05:11,000 --> 01:05:12,960 They'd have a discussion with you, if we decided to get a decision, 765 01:05:12,960 --> 01:05:15,260 we're going to start this project. 766 01:05:15,260 --> 01:05:15,300 We're going to make sure that there's a discussion that's needed. 767 01:05:15,300 --> 01:05:15,460 In the future, we're going to go to a session about the decision decision. 768 01:05:15,460 --> 01:05:20,300 If we did, we'll do the right to start the decision. 769 01:05:20,300 --> 01:05:29,980 What do we want to do if we did the decision to start the decision for the first time? 770 01:05:29,980 --> 01:05:34,060 presented to the Commission in December's planning HPC meeting. 771 01:05:35,340 --> 01:05:38,240 Last update is the calendar update. 772 01:05:39,000 --> 01:05:41,260 So just as a reminder, in this case, it's for camp 773 01:05:41,260 --> 01:05:44,820 and we're looking at, and this is a day-long training 774 01:05:44,820 --> 01:05:47,920 of continuing education on just the importance of preservation 775 01:05:48,680 --> 01:05:52,240 and all things that the NAPC could really give us 776 01:05:52,240 --> 01:05:53,960 and it's something I'm personally looking forward to, 777 01:05:54,020 --> 01:05:55,300 because I think it'll be helpful for me. 778 01:05:56,700 --> 01:05:58,340 The hardest part has been nailing down a date. 779 01:05:58,340 --> 01:06:03,260 They have told us they would prefer bookending it, so 30s day Friday or Monday, and this 780 01:06:03,260 --> 01:06:08,400 is the presenters, those that would be flying out or driving out to teach us. 781 01:06:08,740 --> 01:06:16,180 So what we're looking for from the HPC is some time between January and May of 2026, 30s 782 01:06:16,180 --> 01:06:20,700 day Friday or a Monday that you'd be available the entire day. 783 01:06:23,020 --> 01:06:26,740 I should have sent that out in an email, admittedly earlier to give you some time to look 784 01:06:26,740 --> 01:06:34,240 Your calendars, if you are prepared to speak about it tonight, we could, that would be my preference, but I realize that I've given that direction about a month ago. 785 01:06:34,540 --> 01:06:38,540 So I did not, I believe I failed to remind you all to look at that, and I apologize for that. 786 01:06:38,660 --> 01:06:48,280 So we could also breathe issue that statement and have you take a look for December, but again, it would be beneficial to try to get this done sooner than later. 787 01:06:49,320 --> 01:06:54,760 And if you are prepared to speak in this, we can kind of have a roundtable conversation on what everyone's month looks like. 788 01:06:56,740 --> 01:07:05,000 kind of like a meeting planning, a meeting planning from yeah so are you looking for two full days or 789 01:07:05,900 --> 01:07:12,460 I believe it is just one. Just one. Yep but our plan would be to stay Friday or Monday. Yes, 790 01:07:12,660 --> 01:07:17,840 there's a Friday or Monday okay I believe that they will be the presenters and the speakers will 791 01:07:17,840 --> 01:07:22,680 be coming out those educating will be coming out to meet us here and they would rather do that 792 01:07:22,680 --> 01:07:25,220 a long weekend rather than mid-week. 793 01:07:27,040 --> 01:07:29,600 So are there any particular days that you're thinking? 794 01:07:30,920 --> 01:07:35,820 Honestly, staff is primarily available, and that's the thing, if you'd like I can get 795 01:07:35,820 --> 01:07:39,700 together a few days, we tried doing polling, but unfortunately, it just wasn't working, 796 01:07:39,800 --> 01:07:50,100 and we didn't want to give you, I think, it comes out to like 53 days for you all the 797 01:07:50,100 --> 01:07:53,860 you look all your calendars right now. I'm realizing that now. 798 01:07:54,460 --> 01:08:01,100 Well, and so I can just interject that Mondays are much more difficult for me personally than Thursdays and Fridays. 799 01:08:02,360 --> 01:08:06,200 And I think that's an easy way to carve off a third for my perspective. 800 01:08:07,400 --> 01:08:10,940 But I would just ask everyone if there's days to work. 801 01:08:11,100 --> 01:08:14,640 I mean, because sometimes as approaching weekends, that's difficult for people. 802 01:08:15,300 --> 01:08:19,180 I would say that anyone have a standing Thursday conflict that wouldn't work. 803 01:08:19,180 --> 01:08:26,920 I'll go further and say that January 15 or 22nd, both Thursdays work on my calendar and I have 804 01:08:26,920 --> 01:08:31,940 lots of flexibility, but I'll throw January out because it's less likely to be interrupted by 805 01:08:31,940 --> 01:08:32,840 vacations tomorrow. 806 01:08:35,420 --> 01:08:41,260 I think I'm open on those states too. I am as well. Which one's? 15 and 20 second 807 01:08:41,260 --> 01:08:47,700 15 or 20 second of January Thursdays both. Do those Fridays work or do some any of them? 808 01:08:49,300 --> 01:08:51,700 16th or 23rd also work for me. 809 01:08:55,570 --> 01:08:57,430 Friday would work better for me. 810 01:08:57,570 --> 01:09:00,550 But I could switch things around in my schedule for a Thursday. 811 01:09:01,510 --> 01:09:02,430 That's better for everyone. 812 01:09:02,850 --> 01:09:03,490 Super flexible. 813 01:09:04,570 --> 01:09:07,090 16 and 23rd both work for me as well. 814 01:09:10,540 --> 01:09:12,180 Either of those dates work for me as well. 815 01:09:14,400 --> 01:09:17,320 So it looks like right now we've got four dates. 816 01:09:17,800 --> 01:09:21,440 We're talking about 15th, 16th, 22nd, 23rd. 817 01:09:22,360 --> 01:09:24,040 With a slight preference for Friday. 818 01:09:24,580 --> 01:09:30,940 If that can be done, if anyone see any conflicts on those dudes. 819 01:09:33,800 --> 01:09:36,880 I might have, I might have some, but I don't have it on this calendar. 820 01:09:38,640 --> 01:09:42,960 This staff can send out an email right away tomorrow morning when I plan and make sure, 821 01:09:43,060 --> 01:09:49,820 I know, our missing Commissioner Finwall is that they also have their own recognition meeting tonight in their city. 822 01:09:50,020 --> 01:09:53,520 So what I can do is send that out and just give everyone an opportunity. 823 01:09:54,780 --> 01:09:59,960 I'm cautiously optimistic this felt too easy, but then at the same time I'd be 824 01:10:00,000 --> 01:10:04,340 We can confirm it with camp tomorrow morning right away if those dates worked for them. They've been pretty 825 01:10:04,340 --> 01:10:08,240 available for the most part. I think they're waiting for us. They know the holiday, but I'll just 826 01:10:08,240 --> 01:10:12,120 double check. And I'll send out an email. Have you give you all an opportunity to just 827 01:10:12,120 --> 01:10:18,440 could you pull check your calendars for those four dates? We have January 15th, 16th, 22nd, and 23rd, 828 01:10:18,480 --> 01:10:22,420 targeting Thursdays and Fridays in January. And then tomorrow morning I'll email camp right away and 829 01:10:22,420 --> 01:10:26,520 just see if that is available for them as well. And then email you all as a reminder. 830 01:10:26,520 --> 01:10:44,320 So there was, I think in the grant proposal, based on what some other cities had done, I think Northfield most recently, we proposed to, obviously, try to get the whole staff there, but also to invite the council and planning commission. 831 01:10:44,320 --> 01:10:51,320 do you think? Obviously it's it's important to get a date that works for the full HPC first 832 01:10:51,320 --> 01:10:56,920 but do you think that any of those dates would work better or worse for trying to get? 833 01:10:57,140 --> 01:10:59,600 I'll double check with staff council. 834 01:11:02,060 --> 01:11:04,480 I don't know. I might return to council member 835 01:11:04,480 --> 01:11:10,340 Collins and if they would prefer to have another kind of a called a meeting like commitment to 836 01:11:10,340 --> 01:11:14,520 week of accounts a week or an off week so to speak. 837 01:11:21,200 --> 01:11:24,140 To your point, Chair, all those dates appear 838 01:11:24,140 --> 01:11:28,460 to be mostly I don't think there's any conflicts with day commissions for staff on those 839 01:11:28,460 --> 01:11:33,400 dates and I'd have to check with them on any vacation or time off but I think those are generally 840 01:11:33,400 --> 01:11:37,880 going to be as Commissioner Holmes mentioned pretty low impact or travel dates, so we'll double 841 01:11:37,880 --> 01:11:45,130 check that on staff's perspective. But once we lock in the HPC and NAPC, I'd send it to the 842 01:11:45,130 --> 01:11:48,310 other commissioners and while in council members to try to see if they can get to that. 843 01:11:53,030 --> 01:11:57,880 Thank you for. Thank you. But it's all together and thank you offer. 844 01:11:58,320 --> 01:12:03,040 Okay, I'll just thank you, commissioner Holmes. And above all the just breaking it down. That was 845 01:12:03,040 --> 01:12:04,300 again too easy. We'll see. 846 01:12:09,230 --> 01:12:12,190 All right. It looks like that is everything. 847 01:12:14,510 --> 01:12:20,870 Is there anything else in terms of updates? I think that's when you're to cover with somebody 848 01:12:20,870 --> 01:12:22,970 like to move to a adjourn. 849 01:12:25,160 --> 01:12:26,240 I saw move, summers. 850 01:12:30,190 --> 01:12:32,350 Second meno. Okay, motion by 851 01:12:32,350 --> 01:12:38,830 summers. Second by meno to adjourn. All those in favor. Bye. Any post? Okay. 852 01:12:39,390 --> 01:12:40,770 The meeting is adjourned at 812.