[0:01] I aliance to the flag of the United States of America and to the republic [0:06] for which it stands. One nation under God, indivisible, with liberty and [0:12] justice for all. [0:21] » Okay. Roll call, please. >> Greg Gordon, [0:23] » here. >> Daniel, [0:25] » here. >> Susan [0:26] » here. Jean Delaney >> here. Mike Jackson. [0:32] » Oh, has everybody taken a look at the agenda? Can I have a motion to [0:37] accept the agenda? >> Motion to accept. Second. [0:40] » All in favor? >> I. And the regular minutes from August [0:46] 12th. >> Motion to accept. Second. [0:49] » All in favor? >> I. [0:53] Okay. [0:57] We're going to read. Greetings staff, board, board of [1:01] trustees, and citizens of Sunrise Beach. I would like to first address some [1:06] comments told to me by by another board member. I will explain how a grant from [1:11] the Department of Economic Development works. We put out a bid for an engineer. [1:17] The engineer who was selected by the board was Cochran Engineer. They oversee [1:23] the CDBG grant we received for paving Beachwood Road. After all the initial [1:29] design and engineer work was complete, the village clerk placed an ad that [1:34] Cochran wrote in the newspaper to request bids from companies who wanted [1:39] to do the paving. Cochran sends out a scope of work to any company that [1:45] contracted them or contacted them, sorry, for the bid package. [1:50] Cochran sends out a scope of work to any company that contacted them for the bid [1:55] package. They sent out 10 packages. On the date of bid opening, which was [2:01] August 26th, as stated in the ad, the representative from Cochran arrived at [2:06] city hall. When the clock turned 10:15, I was asked to open the two envelopes [2:13] that we received. I read the front page of the bid that stated the bid price. [2:19] Higgins was 616,522 [2:24] and Main Street was 599,567.75. [2:31] The Cochran representatives said the low bid is Main Street. He then took both [2:37] bids with him to make sure they filled everything out according to the scope of [2:40] the job. Neither myself nor anyone I know had anything to do with the bids we [2:46] received. Both companies have done work in the cities. Higgins won the award for [2:52] paving Singing Oak, Castle Garden, Odo Drive, Spring Road, and Deer Valley. [2:57] Main Street was hired by our village manager to pave Pisces and Cliff Drive. [3:03] Both companies did fine work as far as I know. [3:07] The next comment given to the board member was about who printed our logo on [3:11] our shirt. The village purchased 13 shirts through a wholesaler for $15 a [3:17] piece. My sister charged the village $846 [3:22] a piece to hot press a logo on the shirts. Using her service was the [3:27] cheapest option for the village. Had we ordered from another printer, we would [3:32] have paid around $50 a shirt. We went with the lowest price. To my knowledge, [3:38] we did not break any law by using my sister to hot press the shirts. I'm glad [3:44] there's a group of residents who pay close attention to the way the village [3:47] is being run. We do everything possible to be transparent with running the [3:51] village. Anyone who is paying attention will know that when I was elected in [3:56] 2023, I cut the chairman's pay in half. My salary for chairman is still 7500 per [4:03] year. Correct, Miss Clerk. >> Yes. [4:07] » I work around 30 hours most weeks, so I make about $5.20 an hour. Obviously, I [4:15] don't do this for the money. The rest of the board receives $50 per [4:20] meeting. Our goal is, and always has been to make our village a great place [4:24] to live. Please continue to let the board members know when you have [4:29] questions about how we run the village. On other business, the grant for [4:34] Beachwood did not cover the increase in the asphalt because of oil prices. So, I [4:40] have applied to amend our grant for more funds to cover the additional cost [4:45] through DED. Um, I don't know how long it's going to [4:48] take to get that answer. The engineer for our phase 4 water sewer project is [4:53] hopeful that the construction will begin in the fall. This means hopefully [4:57] decommissioning or beginning the process of the south plant beginning late 27. [5:03] The accountant hired to put the budget together will give us a spreadsheet in [5:08] the next week. So, we will start working on the 2027 budget and hope to have it [5:14] have a first draft by next meeting. I look forward to sharing that with the [5:18] citizens. As always, if you want to give your voice or your opinions, please [5:23] speak to any board member. Okay, this is going to be a rather short [5:30] meeting. I believe we're supposed we have any visitors comments. [5:35] » Go ahead. >> You can take it under adisement that [5:37] fourth uh segment on the sewer system. Will [5:42] that cover the area that I'm in? >> Five. We're in four right now. [5:48] » Okay. >> Yeah, we're in four, which is just [5:51] fixing that plant, >> right? Five is Europe and so as soon as [5:56] he's done with four and it's the same engineer so he'll be working on center [6:02] and >> but do we have any funds available for [6:04] that or the grant is that five >> you know I don't know that he has [6:09] applied for SRF we're going with state revolving fund um and I don't know if [6:15] you can do that until you're ready to start the project I'm I'm not sure about [6:21] that but it'll be the SRF. It won't be a grant, which takes forever. It'll be SRF [6:27] funding. So, >> so if you were to estimate when [6:31] something like that might take place, >> Kaitlin, do you have any opinion on [6:36] that? You've been talking to the engineer. So the SRF funding for 2027 [6:41] has already been put out for public notice, which means that for if that's [6:45] the case for phase five, we wouldn't be out for public notice for SRF funding [6:50] until the end of 2027. [6:57] » Yeah, for 2028 funding. So >> to get 28 funding, [7:02] » yeah, we're probably looking at 28 funding. I do think that they've already [7:06] started working through the funding hoops with the financial group atr [7:13] um and they have begun work on that talking to the drinking water engineer [7:20] on that side. >> So they're working [7:23] » so it's moving I mean >> I know it's not fast but uh it is what [7:29] it is. The only other comment I have is I'd like to express my appreciation for [7:35] the road work that >> taking place here and you did right. [7:41] » Yeah, he did much better job this time than I did the last time. [7:44] » Well, good. >> And then actually there were a couple [7:47] pretty deep holes from the trash truck turning right there. He filled that up [7:51] with some that crush run rock. >> Oh, good. [7:54] » That looks really nice, too. >> Well, good. Have to make sure we tell [7:57] Troy that he got a boy for that. should. Um, okay. Anything else? Would you like [8:04] to talk, Brian? Go ahead. >> Yeah, thank you. My name is Brian Cop, [8:08] regional building official for GBA or George Buffer Associates. Uh, we are an [8:12] architectural and engineering firm and I'm on the code services team. So, we [8:17] partner with municipalities to help with code options, building inspections, [8:21] play. Um, we can help fill in for staffing [8:26] shortages if you have a large project. Um there's a lot that we can do. We have [8:30] a menu of services um on a contract basis, as needed basis. Um we can help [8:36] consult uh again coding options are a big one. And I know you're working on [8:40] some ordinance updates and you know and uh anticipating the possibility of a [8:45] data center. Um we're working with a couple data centers right now. So we've [8:49] got some experience with those and happy to talk to you anytime if there's any [8:55] services that we >> Scott. I think that maybe that would be [8:59] somebody you would want to have a a more detailed discussion with rather than [9:05] asking a bunch of questions now. So since he is the zoning official, [9:13] » especially especially once we start doing building inspection and stuff, I I [9:17] do want to look at contracting that out. >> That might be a good idea. Yeah, [9:20] » I think some of the the restructuring that we're seeing on the fines or the [9:24] increase in permit collection would definitely justify [9:28] » not having >> we'll see what you got. [9:32] » Perfect. >> Thank you. [9:36] » Okay, Chief. [9:41] » So, this month is, like I said, very short. Been revisited with a lot of [9:46] different staff. Uh, last month we had 149 calls, 1,624 self-initiated [9:51] activities, issued 63 citations, 79 warnings. Officer Gregory is into the [9:58] final phase of her FTO. She is now in her own car on her own shift, and this [10:03] is essentially the probationary six month period. So, she's for all intents [10:08] and purposes off FTO and doing her thing. Definitely been a very busy month [10:14] with the heat. So we're glad that's going down. Expecting very busy months [10:18] continuing with Bikefest, Jeep Fest, YouTube. This was the end of everything, [10:23] but we still have about a month. There's several different special events [10:27] with 911 and Bikefest. Other than that, uh grant updates is we [10:35] were formally awarded the Blue Shield grant. So hopefully in the next month [10:40] we'll be able to order the stuff from that. And then there's a [10:44] lo local violent crime prevention grant that opened for 25,000. We've [10:47] historically received really good funding on it and I'll be applying for [10:51] it in the next month hopefully to add a couple radios and potentially body. [10:58] » Great. All moved in. >> All moved in. Everything's almost put [11:03] away. I'm hoping um by the end of next week or the week after I we don't I I [11:11] would love to do an open house for the entire community come in. However, due [11:15] to operational security and criminal justice information, uh we can't do a [11:19] full open house, but I'm hoping in the next week or two to have a day to where [11:22] we can have the board out and come do a tour of the facility and see exactly [11:27] what we're doing there. >> And a ribbon cutting. And yeah, ribbon [11:32] cutting with with you guys and then a couple of the donors that donated Wilson [11:37] family that did the 3,000 for Kent Morris. [11:40] » Great. >> Did you have anything on planning and [11:44] zoning or No, I'm sorry. >> Sorry. LO [11:51] to mimic what Scott just said some slow down the first. So short report [12:01] you guys will notice the water loss has gone up and I wanted to explain why. So [12:06] you'll see in your packet you got these two sheets of paper. These are [12:09] screenshots off of our SCA system. And before anybody goes well cyber security, [12:14] the only thing you can control from our SEA system is turning the pump on and [12:18] off. And as far as I'm concerned, we'll deactivate that as soon as possible. [12:21] That being said, you'll see the red bar. Below that, [12:26] there's a blue bar. So, we've got one that shows the full draw out. Okay, this [12:32] blue line in the graph is our tower height. So, you can see this steady up [12:36] and down, right? Fill and drain. Fill and drain. This is what we like to see. [12:43] See those little right here [12:47] kind of on your far right side? >> Okay. Zoom. The second page is zoomed in [12:53] on that. You can see a pretty significant drop. [12:59] Any guesses about where my water was going? [13:04] Fire department was doing hydro testing and flushing. [13:08] » Did they report that to you? I reported the 15,000 gallons I would I requested [13:14] them to flush that got reported. But as you can see from the graph, I have at [13:20] least one 2 3 4 5 6 7 8 nine other events in that time period where I have [13:29] water flowing somewhere with no accountability for it. So they are doing [13:34] better about reporting. I got a couple more on the SH report that they have [13:39] with us. Um, it's a challenge we're going to keep working on together. It's [13:45] not something those guys think about. And credit to Scott, they had a [13:50] structure fire and we're utilizing the hydrant at deep water. And he told them, [13:55] call them and tell them that helps. I know where that water loss is going. I [14:01] can look at it and I can try and calculate exactly what our loss was on [14:05] that. So that is where that increase has come from. [14:10] So whenever I'm calculating water loss and see an increase past what I think is [14:14] acceptable that's significant compared to the previous one. The first thing I [14:18] do is start looking at our tower and see. One of the other things that did [14:22] happen is we lost a leg of power off of tower one and Troy and I had to flush [14:28] over time for that. So just you guys realize what we're trying to chase with [14:34] these numbers. Um [14:40] operations wise, we're just trying to make it through the heat. Um had a [14:45] couple of meters. We've had a program for new connections, couple new [14:49] connections, um inspections. Nothing too crazy. One thing I did want to note on [14:54] the metering is the schools meter. I don't know if you guys remember when we [14:59] were first discussing the need for replacement, I was talking about how [15:03] let's get this upgraded one. I'm just going to read a little bit more exact. [15:07] Okay, so just looking for comparison numbers. The school's August 2026 bill [15:14] was $789. The August 2025 bill was only $187. That [15:19] meter is paying for itself >> and it will be paid off pretty quickly [15:25] just by virtue of the fact that it's a well capturing usage I guess I should [15:30] say. Um, billing wise, we have two accounts that placing utility leans on [15:38] with during this permission. It's going to total about 3,900 pass due. Um, we [15:45] also have found a previous it it's an old one. It was an agreed turned off [15:50] account, no charge water. They decided to go ahead and turn their water back [15:55] on. So, they got a bill. Our current due is 1,700 and we'll be building a monthly [16:00] moving forward. So anymore other than that and that's [16:07] really tidying some housekeeping stuff. Drinking water's been going pretty good. [16:12] Wastewater. Um [16:17] Aaron will be sending out a bill to the first business that's listed for that as [16:23] that is not the city's responsibility. Um, and I just got her that information. [16:29] » Is that the 4500 gallons of grease? >> Yep. [16:33] » She going to be happy. >> Let's just say that it took two men, two [16:37] trucks, and a lot of fells. It wasn't liquid enough to actually [16:43] fix. Um, all right. We came to the pass lift [16:48] station. We've gotten the electronics repaired only to turn the pump on and [16:52] find out the flange inside the tank is broke. [16:56] It's just one thing after the other. So, now wait until we don't cook the person [17:00] inside of the tank to repair it. We're going to wait for some cooler water. [17:04] We're going to have to drain it down. Daniel's going to get inside the tank. [17:07] We're going to fix the flange. We're going to get that thing operational if [17:10] it's the last thing we do. >> Wow. [17:12] » Um, >> sorry, that was the Indian health [17:16] station. The camp station. We are still waiting on parts and [17:21] don't know where it is. I get answers at this point. I was told [17:27] 12we lead. I'm almost certain we're nearing that when we get it. [17:34] » And you had to go with pains because that was the equipment you were putting. [17:37] » They're the exclusive dealer of that particular piece of equipment. So [17:41] » I guess would it do any good or would you need my help to call them or [17:46] anything? >> I didn't need him still, which is [17:51] usually not the case. So >> okay [17:54] » um South. [17:57] » So given the timeline that I was given, I have been literally holding the thing [18:03] together with duct tape and we are reaching a point of imminent death. Um, [18:08] I have a meeting with Archer to push this stuff along because I'm at the [18:15] point to where it's absolutely makes me sick to spend money on a thing [18:21] when we're going to when we're so close to shut. Um, essentially what's [18:25] happening is I have coupons that are down and I have things that are gravity [18:28] feeding into the next. It's not ideal. That creates a situation where I cannot [18:33] shut half of that facility down like I do in the winter time. So, we've just [18:39] created a bigger problem for ourselves. I have two massive air leaks that I [18:42] can't repair without a welder. I I need it done. So, um we are meeting [18:50] with the project I say we I and whoever else may be interested in attending is [18:55] meeting with the project engineer to clear the final drawing and design. And [19:01] at that point, we still have to wait for final approval from DNR engineering [19:05] section. So, we're I would ask maybe about six months [19:10] behind and that is just killing me, but it is where we are. So, it may reach a [19:16] point where I'm coming to you guys kind of asking what you want to do in regards [19:19] to moving forward with it. I would like to throw as little money as possible at [19:24] it, keep it operational. Obviously, we're not going to discharge unclean [19:29] water. We're not going to do bad things, but we're going to be picking and [19:32] choosing what we need in order. And the other conversations I've had with with [19:37] Troy is where can we cut the the collection system line and push as much [19:42] as possible to the north plant to alleviate the load on the south plant, [19:45] which we have done to an extent already. We're just going to try and push a [19:49] little harder. So, it's not an ideal situation, but [19:53] » I feel like I in front of you guys like more money, more money, more money, more [19:57] things grow, but that one is not a surprise to anybody I think. [20:05] Sorry. >> Any questions? [20:09] » And if you would like me to go with you to talk to Archer, I will. If you don't, [20:14] that's okay. >> I mean, you're welcome to. [20:17] » Okay. I'll talk to you about it later. >> Yeah. I don't know if mostly we're going [20:22] to be having to clear the final design. So, um, they're they're the engineers [20:27] with the numbers. I'm just a girl with a wish list. So, we'll see what happens [20:31] out of the We know >> and we're the city with the [20:35] » That's right. We want anything but work properly in [20:40] your home game. >> Yes. Yes. We appreciate you [20:44] um playing and zoning anything. >> Very busy down permit getting ready to [20:51] start working on a subdivision with developer to see what we can do there. [20:56] as well as we have another home for another land owner who's getting ready [21:00] to hopefully start the planning to include five new homes. [21:07] » I think it's going to be a pretty busy fall with building. [21:09] » Good. Good to glad to hear. >> Uh [21:15] you want to do a report on public works? Um Troy wanted to let everyone know that [21:22] he had been hard at work this um month at getting some mowing done and getting [21:28] definitely some weed eating done. He went to um Jet Ski Beachwood Center. He [21:33] also did a lot of patchwork on some of these roads at Pisces Jet Ski Beachwood [21:39] Center. Um he got a little spraying done at the North and South plant. Um he [21:44] removed some material over on Indian Hills. Um he's been uh working hard to [21:50] make sure some of the roads are ready for bike week. He's still trying to, you [21:54] know, check out a lot of that right now. Um he's just been really steadily trying [22:00] to get as much um weeding and mowing and all the patchwork as he can. So he's [22:04] really keeping up on what you guys have been asking at each meeting. And uh I [22:08] think he's done a pretty good job of it. >> I agree. [22:14] » Okay. Uh, I take it you paid all the the trustees on this this uh is this like [22:20] the time you pay it all? >> Yeah. [22:23] » Okay. [22:29] Anybody have any questions on the finances that want to ask Aaron about? [22:43] I don't see anything blurry. [22:47] This one is pretty much typical. I mean, there isn't anything unusual. [22:54] I do have an Amazon. [23:01] » We bought I think it was a $260 printer because our evidence label [23:06] printer when we made the move stopped working and we tried everything together [23:11] with tech support. Couldn't get it to work. Ordered a new one. Got the same [23:14] error. Glenn ended up doing enough playing around with it. Got the old one [23:18] to work. So, we're trying to return the old one. Okay. Or the new one. Got it. [23:22] Let me know when that happens. I'll see you on. [23:26] » Well, can I have a motion to approve the list of bills? [23:31] » Second. >> All in favor? [23:33] » I appreciate it. [23:37] Um, I have on here a discussion of a five-year plan and I've been saying that [23:43] for the last several months. You know, I'm trying what I'm trying to [23:47] put together and of course it would be easier once we get into budget talk, but [23:52] things that we need to start thinking about going forward [23:57] um for 2027. Number one, Troy is going to have to have another [24:04] vehicle. The one ton is being duct taped and glued, [24:11] whatever it takes to make the van. The air conditioning doesn't work. I mean, [24:15] it's just a mess. And he's going to need a trailer, maybe a trailer. Still [24:21] talking about the many things. So, when we get ready to start looking at the [24:26] budget and everything, um, keep that in the back of your mind. Um, we also I [24:33] talked about us going back to the the streets that we talked about doing. So, [24:39] I'd like to get back on on path to seeing where we can do a little bit of [24:44] paving. And you know, I know I know we got Beachwood covered, but I mean some [24:48] of these other streets that we're talking about and I had a conversation [24:52] with um Troy about this like Flip Lane, that little piece that's I don't know [24:59] why we didn't do it when we were down there, but there's a piece that we [25:03] should do and Camden Pass has some really definitely needs. So, those would [25:08] be the two he's said we should do. um that so there's I've made notes of what [25:15] he thought we should do. So it's something we need to think about maybe [25:19] in the budget for next year is going ahead and trying to get some bids do [25:23] doing a little bit of paving um without going through the big grant process [25:28] trying to do within capital funds [25:34] pay [25:37] and uh [25:42] We have no ordinances, no resolutions. So the next part of this, we're going to [25:49] go into close session for RSMO 510. So we thank you for coming. [26:04] » Motion to >> motion to close session. [26:08] » Yeah. Okay. Second. Okay. [26:12] I'm not >> good. [26:15] » Say yes. >> Daniel, hi. Snider. Yes. Lean. Yes. [26:20] Thank you. Cheers. Bye.