[0:03] >> Good morning, everyone. [0:05] Welcome to the August 26th regular board meeting of Tampa [0:09] Bay water. [0:10] The meeting is available for viewing through live streaming [0:14] and the recording of the meeting will be [0:16] posted on the agency's website. [0:18] Today we are continuing to use our new feature that [0:21] allows board members to request to speak and to make motions [0:24] and seconds using their tablets, rather than speaking out. [0:27] We expect this change to improve accuracy and clarity, [0:30] as it can be difficult to hear across the dais. [0:33] Board members, as we move through the meeting, [0:35] please use your tablets for these functions. [0:38] We appreciate everyone's patience [0:39] as we adjust to this new process. [0:41] At this moment, we have our pledge of allegiance, [0:44] and our vice chair is going to lead us. [0:50] >> I pledge allegiance to the flag of the United States [0:52] of America and to the Republic for which it stands, [0:52] one nation under God, indivisible, [0:53] with liberty and justice for all. [1:02] >> Thank you. [1:03] You may be seated. [1:04] Clerk, can you please call roll call? [1:13] >> (Calling roll) [1:28] Madam Chair, a quorum is present. [1:33] Lisset Hanewicz: Thank you. [1:34] Board members, were there any changes to the agenda? [1:37] I see none. [1:38] At this point, we go to public comment. [1:40] Each speaker will have three minutes to speak. [1:42] The first speaker I have here is David Ballard Gettis, [1:49] Jr. Good morning. [1:53] >> Good morning. [1:54] I live on Georgia Avenue in Palm Harbor. [1:56] The Federalist Papers reveals three constitutions, the former, [2:03] the latter, and the last resort. [2:07] One and one and one is three. [2:11] It's got to be good looking, it's just so hard to see. [2:14] Tip your hat to the new constitution [2:15] and pray you don't get fooled again. [2:18] This change had to come. [2:20] You knew it all along. [2:22] And even Mick Jagger, at Madison Square Gardens in 1969, [2:27] said, welcome to the breakfast shell. [2:31] The Federalist Papers were not written by Hamilton, Madison, [2:36] or John J. The Federalist Papers were originally drafted [2:41] by a shoemaker by the name of Jacob Boehme -- [2:45] shoemaker, stick to thy last. [2:47] The Declaration of Independence, in perpetuity, [2:50] counterfeits itself as preamble to a second Constitution, [2:54] seen as the captures of water, in article 1, section 8, [3:01] clause 11, birthing unwarranted 14th amendment water [3:05] jurisdictions, as declared, thus revealing the methodology [3:09] of the Prince in the Declaration of Independence, [3:13] written by Niccolo Machiavelli -- [3:17] for it is far better to be feared than it is to be loved. [3:21] Even George Washington -- he claims to be of greatest [3:26] rankness and truly one's worst enemy in his farewell [3:30] to Christianity address. [3:31] He states that, twice we are being given a useful lesson [3:37] on our heads, seen as a useful art for limited times [3:40] in article 1, section 8, clause 8. [3:46] Our current constitution, unconstitutionally, [3:49] is being used as a letter of Marquis, an ex post facto [3:53] form of reprisal, seen as inexcusably [3:57] defective in Federalist paper number 64, [4:00] both deaf to the voice of justice and consequently, [4:04] as written in the Declaration of Independence. [4:07] Abraham Lincoln -- he did not write the 14th amendment. [4:11] He amended it to include the rebellion clause, [4:16] denouncing the book of Rebellion, [4:18] such Well-bound book of rebellion as possibly [4:22] found in statute 298.36. [4:28] London bridges falling down, London Bridge is falling down, [4:33] and they can take their wayfaring mercenaries [4:35] down with them, too. [4:37] Welcome to the bond market. [4:40] Thank you. [4:42] Lisset Hanewicz: Thank you. [4:43] Next up, Joe Abersoch. [4:48] Good morning. [4:52] >> Good morning, ladies and gentlemen. [4:54] My name is Joe. [4:55] I live in Tampa, Florida, 3.6 miles north of the football [4:59] stadium on Lake Carol. [5:03] Representing Lake Carol today -- approximately 1000 people. [5:11] There's about 400 homes on the lake, about 600 [5:14] that used the lake. [5:17] The lake is at record low, and we are (Inaudible). [5:23] Based on that condition, the lake is under duress to this [5:27] degree -- there is no boating. [5:29] There is no fishing. [5:30] There is no action. [5:31] And worse, there is collateral damage. [5:34] There is a number of boats, probably 50, up on the lift [5:39] because we have no water under our dock or lift. [5:43] Those boats are stranded there. [5:46] That brings us to, why am I here? [5:50] I am here representing the three associations [5:53] that are asking for help. [5:56] We know we cannot solve this problem. [5:59] This problem is very complex. [6:02] It requires a lot of effort, coordination, [6:06] of which I want to report now that there was coordination [6:11] being done through the coordination help (Inaudible). [6:16] He's going to set up the meeting to do this. [6:18] That's why I'm here, is to personally thank him [6:22] for his responsibility to support us. [6:25] But I also know that it's going to take a lot more coordination [6:31] . [6:32] We are in a drought. [6:34] Where is it going to end? [6:36] I don't know. [6:37] But that's why we're here. [6:38] In summary, I want to thank you for the time this morning [6:41] and the opportunity to speak with you. [6:43] And if you keep in mind, Lake Carroll needs your help. [6:48] Thank you very much. [6:51] Lisset Hanewicz: Thank you. [6:52] I have no more public speakers. [6:55] If you can just keep us posted on your work, we appreciate it. [7:00] Thank you. [7:01] Next up, we move on to consent. [7:05] Are there any items that the board wishes to pull? [7:08] I don't see any. [7:14] So we have the -- [7:16] I had the mover to approve as Commissioner Wostal. [7:23] Seconder, Miranda. [7:29] >> I'm going to spam that button the whole meeting. [7:35] Lisset Hanewicz: He moved quickly, and he exactly what [7:37] he was doing. [7:40] Board members, please enter your votes. [7:45] >> Motion passes unanimously. [7:48] Lisset Hanewicz: Thank you, clerk. [7:50] Next up, we move to the regular agenda. [7:52] We have the general manager's report. [7:54] This item is for information only. [8:00] Charles Carden: Good morning, Madam chair and members [8:01] of the board. [8:02] We will start by having Mr. Hogg go to the presentation podium [8:08] as I speak to the conditions out there briefly. [8:10] He will get into a little more detail in. [8:13] We are still in the drought. [8:15] We are about more than halfway through [8:17] our typical rainy season. [8:19] Good news is, we did put some water in the reservoir, [8:23] and it has been a long time coming. [8:25] I know we are about -- we are over 4 billion gallons. [8:29] The reservoir does hold 15 billion gallons, [8:32] so we have got a long way to go. [8:34] It took a while to get to where we are, [8:36] so it will take a little while to get out. [8:39] Warren, would you walk us through some of the statistics? [8:45] >> Yes, good morning, Madam chair, members of the board. [8:48] We are still looking at drought conditions [8:50] that cover most of the state, especially our tri county area. [8:55] We have started making some progress [8:57] in diminishing the drought conditions, [8:59] although it is still persistently [9:02] in extreme or severe drought over almost all [9:05] of the three county area. [9:07] This was an update from last week. [9:10] This map is updated once per week, [9:12] and we do watch it closely to see how things are progressing. [9:15] Since the rains happened, it caused some recovery. [9:19] I don't expect a whole lot of gain [9:23] to be seen for the next week or so. [9:27] But we are anticipating our summer rains [9:29] to return later this week. [9:31] Hopefully they will return and stay with us. [9:35] Our service area remains in a stage 3 regional water supply [9:41] shortage under our Water Shortage mitigation plan, [9:44] and that is because we are running a rainfall deficit [9:46] of 14.3in over the last year. [9:50] And the flow in the Hillsborough River [9:53] remains at 23.3 million gallons a day [9:57] below the normal level for the last 12 months. [10:01] Water Management District continues its phase 3 water [10:08] shortage restrictions, and that is good until at least October [10:11] 1st. [10:11] If we don't see some improvements in our conditions, [10:15] that could possibly be extended. [10:17] We'll be continuing those discussions with the Water [10:20] Management district. [10:21] So water conservation enforcement [10:26] will remain critical through the summer [10:29] and fall as we try to recover and focus [10:31] on storing as much water in the reservoir as possible. [10:36] Mr. Carden mentioned, it took a while to get into this. [10:41] It's going to take a while to get out. [10:42] We started our drought conditions [10:44] in September of last year. [10:46] We should have gotten 7.5 to 8in of rain, [10:48] but we only got about 2. [10:50] It has been very, very dry since, with only average rain [10:55] in December and July. [10:57] We had one good month, and that was May. [11:00] That has put us into the significant shortage [11:03] that we are in. [11:05] We did get River flows increasing in late July, [11:11] with rains finally in the upper part of the river basins. [11:15] Until then, much of the rain had been [11:17] along the coastal communities, which does help reduce demand, [11:20] but it did not make the rivers flow to the point [11:23] where we could sustainably harvest water. [11:27] Through the month of July, for the first ten months, [11:32] we delivered an average of 206.1 million gallons a day [11:36] for the year to date. [11:38] It's about 7 million gallons a day higher than last year [11:41] because of the drought conditions. [11:43] It's about 3.5% more water than last year. [11:47] We are focused on refilling the reservoir, [11:52] but we are looking for glimmers of good news. [11:54] It appears that the conservation and enforcement of restrictions [11:58] is paying off. [12:01] We had projected, throughout the beginning of the year, [12:05] we project what we need to deliver, [12:07] we expect to deliver each month. [12:12] For the month of July, we delivered about 10 million [12:14] gallons a day less than we had anticipated. [12:16] For us, that means that the restrictions and the enforcement [12:20] are helping, along with some of the much needed rain [12:23] in the coastal communities. [12:25] The 12 month average rate for the consolidated permit [12:30] Wellfields has been steadily increasing [12:33] since July of last year, and we reached a 12 month [12:37] running average of 106.3 million gallons a day [12:40] at the end of July. [12:42] As we are focused on refilling the reservoir as much as we can [12:50] this summer, it has caused us to shift our production [12:52] to other facilities, such as the well fields, [12:56] at the desalination facility, so we can store [13:00] as much water as possible. [13:02] We do anticipate this will begin to decline as soon as we [13:07] can get some sustained rains. [13:09] We are running our surface water treatment plant [13:11] at 30 million gallons a day. [13:13] For this month, we have been running that simply [13:15] from river flow, not taking any out of the reservoir. [13:18] That's good news. [13:20] We are either running at 30 for what we capture -- [13:23] everything else is going right into the reservoir for storage. [13:26] The south Central Hillsborough Regional Wellfield, the running [13:31] average, average 26.57 million gallons a day [13:35] at the end of July, which is below its permit limit. [13:38] And we expect to remain pretty close to the permit limit [13:42] for the coming months. [13:44] Our reservoir was forecasted to be almost 3.5 to 4 billion [13:52] gallons at the end of July. [13:55] We were flat lined, as we have not stored any water in it [13:59] until really the end of the month. [14:01] As of last night, we did increase over 4 billion gallons. [14:07] We are now about 26% full. [14:10] That's an encouraging sign. [14:13] If we can get good summer rains starting again this week, [14:16] we will store as much as we can for the coming dry season. [14:20] Before we transition, I'd be happy to answer any questions [14:25] on this section. [14:30] Lisset Hanewicz: Questions? [14:33] Thank you. [14:38] Charles Carden: I will continue with some [14:38] of the topics on this slide. [14:40] In July, our IT department and some of our other leadership [14:44] departments conducted a cybersecurity tabletop exercise. [14:48] It was our first time doing that internally. [14:52] It Was very well attended, and we [15:00] learned a lot working amongst ourselves [15:01] and something that is a different threat out there. [15:05] We also continued to closely monitor [15:07] reports of the cyber activity targeting water utilities [15:11] across the United States. [15:13] We remain actively engaged in evaluating possible threats [15:17] to our systems. [15:19] Also, last month, at the agency hosted a series of knowledge [15:22] to implementation workshops -- [15:27] we call them K2i. [15:27] We had three of our members -- they were represented here, [15:32] Hillsborough County, Pinellas, with these workshops. [15:36] We shared knowledge and explored innovative solutions [15:38] to some of the common utility challenges that we all face. [15:43] Also, just Tuesday last week, at the Pasco County Commissioners [15:49] formally approved requesting with Tampa Bay water, somewhere [15:55] east of Cypress Creek. [15:55] We have to work out the details. [15:57] It is something that will come to this board [16:02] in the form of a letter. [16:03] We will bring it to the next board meeting for approval, [16:06] and then we will evaluate and work out [16:09] an agreement with the county. [16:11] I believe the letter coming will say a new point of connection [16:15] is needed by the year 2035. [16:17] Also wanted to give you an update on our pricing of bonds [16:22] that we did in July. [16:24] The board approved a resolution to secure $292 million [16:28] for our capital improvement plan coming up and also refunded [16:33] a portion of the outstanding 2016-A bonds. [16:38] On August 4th column at the agency price the revenue bonds [16:41] and the refunding bonds, and they were well received [16:46] by the investors. [16:47] In fact, they were oversubscribed six times, [16:51] meaning we needed $360 million, and we ended up [16:55] getting orders for over 2.3 billion, [16:57] which put us in a good position to negotiate lower rates. [17:01] The next challenge or milestone will be August 27th. [17:05] That will be the closing of the bond funds. [17:09] So that should be coming up here in the next two weeks. [17:13] Also, we have been busy talking to local stations [17:19] and the newspapers about the recent rain in our drought [17:22] conditions. [17:23] You see here, Warren, myself, Paul [17:26] or on some of the local news stations [17:29] talking about the recent rains and how they are affecting us. [17:33] Malik Rankin -- she is on the picture on the far right -- [17:39] she is our public communications specialist. [17:41] She participated in Keep Tampa Bay Beautiful Back to School [17:45] Bash earlier this month. [17:47] We sponsor their education program, [17:49] which helps make these events and activities possible. [17:53] And recently, our staff attended the [17:57] build Saint Pete Construction Expo, which [18:00] connects businesses and buyers and agencies [18:02] to provide access to opportunities and partnerships. [18:06] And finally, I would like to congratulate the finance team [18:11] for receiving the Government Finance Officers Association [18:17] Distinguished Budget Presentation Award. [18:21] I believe it is the year number 18 in a war, so -- [18:26] your number 18 in a row, so -- year number 18 in a row, [18:34] so congratulations. [18:35] With that, I'm happy to take any questions. [18:41] Lisset Hanewicz:18 year streak. [18:41] I don't see any requests to speak. [18:43] We are going to move on to our action items. [18:45] We have C.1 and C.2 that are going to be presented together. [18:52] Good morning. [18:56] >> Good morning, madam chair, members of the board. [18:58] Today will present two related action [19:00] items that support the final delivery of the South [19:03] Hillsborough pipeline and associated projects. [19:06] This map illustrates our South Hillsborough pipeline project. [19:12] The pipeline is essential to meeting [19:14] Hillsborough County's growing water needs in the 2028 time [19:18] frame. [19:19] In addition to the pipeline, the project [19:22] also includes the requested improvements [19:24] to Hillsborough County's infrastructure, as well as [19:28] new points of connection and a new alkalinity adjustment [19:34] facility. [19:34] This project is being delivered through the Construction Manager [19:40] at risk. [19:43] The work is competitively bid and awarded [19:45] as the project advances, allowing construction [19:50] to proceed while remaining design elements are finalized. [19:52] The board initially approved Garney and has already [19:59] approved the Preconstruction services and three [20:02] guaranteed maximum GMP packages. [20:05] Today's action is for the fourth and final package. [20:07] The project is well underway, and work on segment B [20:12] of the pipeline is beginning. [20:13] And approval of this package will [20:16] provide the remaining construction [20:17] scope needed to complete the South Hillsborough pipeline [20:21] project. [20:22] I will proceed with a more detailed construction [20:25] update at the end of this meeting under Agenda Item D.1. [20:31] Now, moving on to the action Items, agenda item C.1 -- [20:35] we request approval of the Fourth Amendment -- [20:42] GMP number 4 includes the new alkalinity adjustment facility, [20:48] Hillsborough County improvements, and the points [20:50] of connection work. [20:51] The total value of this GMP is $53.65 million, [20:55] with Tampa Bay water funding about 38.8 million [21:00] and Hillsborough County funding about $14.8 million. [21:04] With that, staff recommends the approval of this GMP amendment [21:12] in the amount of $53.65 million. [21:25] Dave Eggers: Thank you for the presentation. [21:25] Just a brief update on how we are doing with these projects, [21:28] as compared to what we were estimating costs to be -- [21:33] just trying to get a feel overall. [21:37] >> Sure. [21:37] I have my handy notes in here. [21:39] So initially, the project scope included segment a, segment B, [21:43] and the points of connection work. [21:46] The current budget, as published in our latest program, [21:51] is $505.7 million, and with the work [21:56] that we are requesting approval today, [21:58] the total budget is $534.4 million. [22:03] It's about $28.7 million above the current budget. [22:11] Most of the work and the delta that we see in this project [22:17] is reflected with work that was requested [22:20] by Hillsborough County, a significant portion of that. [22:23] In addition to that, we have increased slightly the budget [22:28] for property acquisition for segment B. [22:32] That's the delta that you will see and the net increase. [22:40] Dave Eggers: Thank you. [22:43] Lisset Hanewicz: I don't see any other request to speak. [22:45] If anyone wants to make a motion -- [22:49] we have Commissioner Wostal moving with a second [22:56] by Commissioner Cohen. [23:01] >> Motion passes unanimously. [23:04] Lisset Hanewicz: Thank you. [23:05] Move on to the next item? [23:08] >> With approval of the GMP amendment addressed in this [23:10] agenda item, I will now transition to agenda item C.2, [23:14] which addresses the program and Construction Management services [23:17] for this project. [23:19] Now, they have supported Tampa Bay water [23:22] throughout the planning, design, GMP negotiations, [23:26] and construction phases of the South Hillsborough pipeline [23:28] program and associated projects under their Integrated Program [23:35] Services Management contract. [23:36] They have been supporting this program since 2022. [23:40] This amendment to task authorization under [23:44] their contract -- they will continue to provide the three [23:47] key functions shown on this slide. [23:50] Through these efforts, they will continue overseeing program [23:54] delivery, coordinating the engineering and construction [23:57] services and teams, and provide a strategic support to Tampa Bay [24:05] Water -- [24:06] completion and closeout. [24:07] With that, staff request approval of this assignment [24:12] increase to Black and Veatch in the amount of $3.76 million. [24:19] Lisset Hanewicz: I don't see any request to speak. [24:24] Dave Eggers: Again, kind of a cost -- [24:25] this is just the last piece, so what is their contract total bid [24:31] so far? [24:33] >> Agenda item C.2 do have the total number reflected. [24:37] If you give me one second, I will find it exactly. [24:39] I believe it is $7.3 million, the total, since 2022, [24:49] through the end of this project, which will be by the end of -- [24:57] Dave Eggers: 3.7 that we are -- [25:00] >> The aggregate of the entire assignment will be 7.37. [25:07] Dave Eggers: $534 million? [25:12] >> That's included in that total. [25:15] Lisset Hanewicz: I don't see any other requests to speak. [25:15] If there is a motion to approve -- [25:17] there is a motion by Commissioner Wostal and second [25:23] by Commissioner Eggers. [25:30] >> Motion passes unanimously. [25:33] Lisset Hanewicz: Thank you. [25:34] Next up, we have C.3 that is going to be presented [25:38] by our general counsel. [25:41] >> This is another item related to the South Hillsborough [25:42] pipeline, requesting approval of the settlement with the Fishhawk [25:46] Community Development District for easements and two temporary [25:49] easements -- that's the most property we are obtaining from [25:53] any one parcel or property owner. [25:55] The amount of the settlement is a little over $2.1 million in. [25:59] Recommended by our Special counsel, [26:01] and we are recommending approval. [26:03] Happy to answer any questions. [26:08] Dave Eggers: Same question -- how are we doing as it relates [26:11] to what we were estimating those costs to be total? [26:16] >> I would have to defer to Maribel to give you those [26:20] figures. [26:24] >> I'm glad I prepared for this in. [26:25] So actually, property acquisition [26:27] have increased slightly for segment B. Most of the remaining [26:33] parcels that we are acquiring are undergoing the eminent [26:35] domain process. [26:36] We have seen that we have been negotiating quite a lot [26:41] with the property owners. [26:43] So initially, segment B had a budget of $9 million, [26:49] and we are estimating, as of today, [26:50] that we will be spending $11.4 million -- fron 9, [26:59] initial budget on property cost only. [27:03] Dave Eggers: Let me just add, that is to segment B. [27:05] The entire property budget for that whole pipeline is $23 -- [27:13] Charles Carden: Let me just add, that is segment B. We've got -- [27:18] a total of 204. [27:19] We are getting close to the end. [27:21] We have some -- in the budget. [27:27] Dave Eggers: You have spent 11.4 on B? [27:32] Charles Carden: On the entire A and B. [27:36] Dave Eggers: The budget was 23 originally? [27:41] Charles Carden: Yes. [27:43] Dave Eggers: Thank you. [27:45] Lisset Hanewicz: I don't see any other requests to speak. [27:45] There's a motion to approve. [27:47] There is a motion by Commissioner Eggers, [27:53] second by Commissioner Wostal. [27:58] >> The motion passes unanimously. [28:02] Lisset Hanewicz: Thank you. [28:04] C.4 -- this is going to be presented by Danielle, [28:07] the senior project manager. [28:08] Good morning, Danielle. [28:12] >> Good morning. [28:13] Agenda item C.4 is an action item. [28:17] At the end of this presentation, I [28:18] will be requesting approval for the Professional Engineering [28:21] Services contract. [28:22] As a reminder, the South Hillsborough Wellfield [28:26] has been a potential water supply project since 2018, [28:30] and public engagement has occurred since 2021. [28:33] Staff completed a feasibility study in 2021 [28:36] that included the construction of the test production well [28:39] and aquifer performance Test. [28:40] The study confirmed the project's feasibility [28:43] and alignment with the board's approved evaluation criteria [28:46] of cost effectiveness, environmental stewardship, [28:49] and viability. [28:51] The second aquifer performance test [28:53] was conducted in 2023, which validated these results. [28:57] October of 2025, the board approved this project [29:00] as a new water supply and treatment capacity project. [29:03] Since then, the team has advertised [29:05] request for proposals for professional engineering [29:08] and Construction Manager at Risk Services. [29:10] Today's presentation is for approval of the Professional [29:13] Engineering Services contract. [29:15] This project was originally contingent on agreement with [29:18] Hillsborough County that included the purchase [29:20] of groundwater recharge credits to provide the net benefit [29:29] associated with our proposed withdrawals -- [29:34] unable to reach terms of agreement in a timely manner, [29:38] and the project was put back into the long term master water [29:41] plan for future consideration. [29:42] Since that time, this board has approved the acquisition [29:45] of water use permits from private landowners, [29:47] enabling the transfer of water use permits to this wellfield. [29:51] We now have acquired 3.7 million gallons per day [29:54] and are working towards three more [29:56] water use permit acquisitions that we estimate [29:59] will yield about 5.5 MGD. [30:05] We can also increase the yield of this wellfield [30:07] by up to 6.1 million gallons per day [30:09] if we can successfully negotiate to buy reclaimed credits [30:11] with Hillsborough County. [30:12] This yield is based on the county's minimum recharge [30:15] of up to 10 million gallons per day. [30:18] The total potential yield of 6 to 12 million gallons [30:21] could go up if we acquire additional permits [30:24] or if Hillsborough County increases its aquifer recharge [30:26] system. [30:27] This project does have potential to be implemented in phases, [30:31] as we acquire additional quantities. [30:35] The proposed wellfield layout shown here [30:37] would support withdrawals of 6 to 12 MGD, [30:43] with the design and construction of up to eight production [30:45] wells, monitoring wells, approximately four miles [30:47] of collector main piping, a groundwater ozone treatment [30:50] facility for the removal of hydrogen sulfide, [30:52] and a point of connection and metering facilities. [30:54] This project will be delivered using a construction manager [30:57] at risk, which is the same delivery [31:00] method being used currently for the South Hillsborough pipeline. [31:03] The estimated completion date is November 2029, [31:06] which will help meet the region's growing drinking water [31:10] needs. [31:11] The scope of services for this project or this contract [31:14] includes a well design and testing, water treatment [31:17] and collector main design, groundwater modeling, [31:20] permitting support, surveying services, [31:24] CMAR collaboration and negotiation support, [31:28] and public outreach. [31:30] And with that, staff recommends approval of the Professional [31:34] Engineering Services contract with Stantec consulting [31:38] for $14.3 million. [31:44] Lisset Hanewicz: Thank you. [31:44] I don't see any requests to speak on this item. [31:46] Is there a motion on this item? [31:49] There is a motion to approve by Commissioner Cohen, seconded [31:54] by Council Member Miranda. [31:58] Please enter your votes. [32:03] >> Motion passes unanimously. [32:06] Lisset Hanewicz: Thank you. [32:06] We are done, I think, with the South Hillsborough items. [32:09] Next up, we have surface water treatment plant item. [32:12] That is C.5. [32:15] The project manager is going to be presenting. [32:18] Good morning. [32:22] >> Good morning Madam Chair, and members of the board. [32:24] I am Tampa Bay Water Project manager I'm. [32:26] Agenda item C.5 is an action item at the surface water [32:33] treatment plant. [32:34] At the end of this presentation, I [32:35] will be requesting your approval for the contract amendment [32:39] for the construction phase services associated [32:43] to this project. [32:46] The supervisory control and data acquisition system, better known [32:53] as the SCADA system, is used by Tampa Bay Water [32:57] to monitor and control facilities remotely, using [32:59] real time operational data. [33:01] The SCADA system project, which is included in our capital [33:07] improvement program, will modernize the technology [33:09] behind the system, including PLCs, [33:13] data networks, and cybersecurity controls, among others. [33:18] The design phase services, known as the phase 1 , [33:26] was approved by this board back in February 2025. [33:28] Since then, our team have finished 100% design, [33:32] which includes engineering evaluations and the negotiated [33:37] guaranteed maximum price for phase 2, construction phase, [33:42] which is amendment being -- which is presented today. [33:45] As for the coming milestones, we will start construction [33:50] activities now in August, concurrently [33:53] with the surface water treatment plant expansion project, [33:56] and we will reach substantial completion and final completion [34:01] by December 2028 and February 2029, respectively. [34:06] Moving on, this slide summarizes the project costs [34:12] under the existing contract and the proposed $20 million [34:21] amendment, which includes equipment and materials, [34:25] construction labor, and owners allowances and contingencies. [34:29] With that, staff requests approval of the negotiated [34:34] agreement amendment with Veolia for the construction services [34:40] in the amount of $20.3 million, which includes about -- [34:45] this concludes my presentation. [34:46] I'm happy to take any questions. [34:51] Lisset Hanewicz: Thank you. [34:51] I don't see any requests to speak at this time. [34:53] Is there a motion on this item? [34:55] There is a motion from Commissioner Wostal, seconded [35:01] by Council Member Miranda. [35:02] If you can open voting, Council members, [35:08] please issue your votes. [35:12] >> Motion passes unanimously. [35:14] Lisset Hanewicz: Next up, we have C.6. [35:16] This is for professional services contracts, [35:18] as needed engineering services. [35:20] This is going to be presented by James [35:22] Smith, professional engineer. [35:26] >> Good morning. [35:27] Again, my name is James Smith. [35:27] I'm a professional engineer in the engineering department. [35:30] This, I will present agenda item C.6 regarding the new as needed [35:34] engineering services professional services [35:38] contracts and request your approval. [35:40] The current as needed engineering contracts [35:44] approved in September of 2021 are nearing expiration. [35:47] Recent updates to Florida's consultants Competitive [35:50] Negotiation Act increased the threshold [35:52] for continuing contracts, allowing [35:55] Tampa Bay water greater flexibility in delivering [35:58] smaller engineering projects. [36:00] Tampa Bay Water continues to advance major capital [36:03] improvements, asset renewal efforts, and long term planning [36:07] initiatives. [36:07] To support this work, we need to access a wide range [36:10] of engineering expertise. [36:12] These contracts provide flexibility to obtain [36:14] specialized support through studies, design, permitting, [36:18] and technical services, as needs arise, [36:21] without conducting separate -- for each assignment. [36:25] We conducted a procurement process [36:27] that is described in your agenda memo. [36:29] Firms were invited to create teams [36:31] that qualified for all engineering disciplines. [36:34] There were 25 responses to Tampa Bay Water's invitation [36:38] for the five year contract at a value [36:40] not to exceed $1.25 million. [36:42] And individual tasks to up to $500,000. [36:44] Tasks above this amount will require board approval, [36:48] as the task that supports a CIP project. [36:54] Evaluating 25 responses is a significant effort. [36:57] A special thank you to the Committee for their huge effort [37:01] in evaluating the responses. [37:02] Award of these contracts does not obligate the board [37:05] at this time. [37:06] The budgets for these expenditures [37:09] are (Inaudible) approved each year or in the project [37:12] budgets, as approved by the board. [37:14] Based on the qualifications and very tight scoring, [37:17] all 25 contracts are recommended for award [37:20] for as needed engineering for the next five years. [37:23] This slide lists the recommended firms. [37:26] Out of the 25, nine firms are brand new [37:32] or have not worked with Tampa Bay Water recently. [37:35] Staff recommends approval. [37:38] This concludes my presentation. [37:40] I'd be happy to answer any questions you may have. [37:45] Lisset Hanewicz: Thank you. [37:46] Any comments, questions? [37:48] I guess we have increased over 100% -- from 12 to 25? [37:54] That's good. [37:55] More competitive. [37:55] If there is a motion on this item -- [37:57] there is a motion to approve by Commissioner Wostal. [38:02] Clark, if you can open the machine [38:03] for voting, board members, please enter your votes. [38:09] >> Motion passes unanimously. [38:12] Lisset Hanewicz: Thank you. [38:12] We move on to presentation and reports. [38:14] The first presentation is the South Hillsborough pipeline [38:18] and surface water treatment plant expansion projects [38:20] construction update, and Maribel Medina is going to present this. [38:28] >> Now to the fun stuff, right? [38:34] Agenda item D.1 provides an update -- [38:37] I will start with an update on our surface water treatment [38:39] plant expansion project. [38:41] Now, the surface water treatment plant [38:44] is the heart or workhorse of our surface water system. [38:49] In 2022, the board approved this project [38:52] as part of our long term master Water [38:54] plan to meet the region's needs by the year 2028. [38:59] The plant expansion will provide up to an additional 12.5 million [39:04] gallons per day to the region. [39:07] It includes a fifth treatment train, [39:12] along with supporting systems, which are labeled A [39:16] through E on the diagram. [39:18] The new treatment train will mirror the existing treatment [39:21] processes currently in operation. [39:24] Area A represents the fifth treatment train. [39:27] Area B shows the built -- belt press replacement. [39:34] Area C identifies the location of the three new filters. [39:39] Area D shows the location of the chemical buildings, [39:43] and area E shows the expanded solids drying beds. [39:47] In area A, ground reinforcement has been completed. [39:50] The team is currently working to cut these reinforcement columns [39:55] down to grade before installing the load to transfer platform. [39:58] The picture on the bottom right shows the ongoing work [40:01] for the routed columns cut down to rate in support of the load [40:06] transfer platform installation. [40:08] The main picture shows the pipe Gallery new overhead conduits [40:14] piping from the south electrical building into train number 5. [40:20] In area B, three of the belt filter presses [40:22] have been delivered to the site and are set in place. [40:25] The installation of piping and feeding [40:27] connections to support the new presses is now in progress. [40:31] And the main picture shows the new belt filter [40:35] press area and plumbing work, and the top left picture [40:39] shows one of the belt filter presses containment [40:42] walls and concrete pedestals. [40:45] In area C and D, the team have completed the installation [40:51] of the 16 inch filter to waste piping and concrete encasement, [40:56] the installation of formwork and Rebar [40:58] at the hypochlorite and ferric tanks, and leak [41:02] testing of the chemical tank containment area walls. [41:07] The team is now working on the installation of the 48 inch [41:10] piping at an existing connection and new filter 16 [41:15] through 18, load transfer platform, and conduit [41:19] installation from the dry chemical building [41:21] to the electrical building. [41:23] Now, the top right picture shows the chemical tank containment [41:27] wall Rebar installation, and the main picture [41:33] shows the final product and leak test for this new chemical tank [41:37] containment area. [41:38] Overall, the surface water treatment plant project [41:41] is progressing well and remains on track. [41:44] Construction work is currently at 10% of work completed, [41:48] and spending is aligned at 20% of the total $167 million [41:54] budget. [41:56] As construction activities increase, [41:58] our effort will continue to be on maintaining [42:02] alignment between progress, spending, and schedule [42:05] performance. [42:06] At this stage, we have not identified any need [42:09] to use our owner's allowances. [42:14] Now I will proceed with an update on our distribution [42:18] system expansion project, the South Hillsborough pipeline. [42:25] Lisset Hanewicz: Before you proceed, [42:27] I have Commissioner Wostal. [42:29] You want to wait till the end? [42:33] Okay. [42:34] >> This pipeline will carry water from our surface water [42:34] treatment plant at the Regional Facilities site to Hillsborough [42:38] County to meet the county's water needs. [42:43] You will recall, from previous presentations, [42:46] that we have identified 17 tunnel locations that [42:50] were strategically planned to minimize traffic disruptions [42:54] and reduce environmental impacts during construction, as well. [43:00] Those are shown in the orange diamonds [43:03] across the entire route. [43:05] Since our last update, we have added [43:08] two additional red circles, which [43:10] show the locations where tunneling work has [43:13] been completed. [43:14] A total of six locations have been completed. [43:17] Now, here is another look at the route, [43:21] showing all the locations under construction for both segments A [43:27] and B. These sites include micro tunnels, open trench [43:34] installation. [43:35] Over the past month, the project team [43:38] has worked really hard to prepare [43:41] for back to school traffic near construction zones. [43:44] Numerous coordination meetings were [43:46] held with Hillsborough County Public Schools, transportation, [43:50] and safety departments, and Hillsborough County Sheriff's [43:53] Office was represented in some of these meetings. [43:57] There was also close coordination [43:59] with Brandon High School, Kingswood Elementary, [44:02] Boyette Springs Elementary, Valrico Academy, [44:08] Bell Creek Academy, and Saint Stephen's Catholic. [44:12] Before the school started, the team [44:15] created and printed fliers for six different schools' [44:19] back to back nights and created social media graphics [44:22] for schools to post on their websites or social media [44:26] channels. [44:27] And we are happy to report that construction, despite all [44:31] the weather-related challenges, at Brandon High [44:36] School has been completed. [44:37] The east and west parking lots were [44:39] accessible before the start of the school year. [44:41] And to make up time and minimize impacts at Kingswood Elementary [44:45] School, the contractor had two crews working, one day crew [44:52] and one night crew, to complete the installation [44:55] as soon as possible. [44:56] This morning, I got the text message [44:58] saying that all work is complete. [44:59] So this is excellent news for the project [45:01] and the parents in that area. [45:04] Moving on, crews also are making progress in other locations. [45:11] In the image on the left shows installation of the carrier pipe [45:15] for the Lakewood Micro Tunnel. [45:18] The pipe has been installed, and crews [45:21] are working to backfill the tunnel so that the roads reopen [45:26] within the next two weeks. [45:28] The image on the right is a drone view [45:33] of the Little FishHawk horizontal directional drill. [45:39] Completion of the horizontal directional drill [45:41] marked a significant milestone, as [45:44] both horizontal directional drilling [45:47] crossings for the project are now complete. [45:50] The remaining trenches work consists [45:54] of microtunnel installations. [45:59] Beyond the outreach to local schools, [46:00] the public engagement team has created a video reel [46:06] on the horizontal directional drill which received about [46:10] 158,000 views across all platforms through July. [46:14] We also created one on the process that received about [46:20] 43,000 views and ones on the bentonite slurry used [46:24] for the pool that received about 81,000 total views. [46:27] The team is also coordinating efforts [46:30] with two tours for Hillsborough County staff [46:33] and a presentation to the Brandon Rotary Club. [46:39] Overall calm at this project is progressing well [46:41] and remains on track. [46:42] Construction is about 8% completed, [46:46] based on the number of linear feet of pipe installed. [46:50] And construction spending is aligned [46:52] at 20% of the total $461.2 million [46:57] construction budget, which includes construction [47:00] costs, engineering services during construction, [47:04] and support. [47:07] At this stage, we have not identified any correction [47:09] actions for schedule and budget. [47:11] And this concludes my presentation. [47:13] I will be happy to answer any questions. [47:19] Lisset Hanewicz: Commissioner Wostal? [47:24] Joshua Wostal: Thank you. [47:24] My comments are particularly about the pipeline, not [47:25] the water treatment plant. [47:27] I know that you guys have done significant outreach, [47:30] and I understand that, in general, [47:34] the public would like their water to just magically come [47:37] from the faucet, and they don't want [47:39] to see the construction that goes along with it. [47:41] I met a nice young British woman, [47:47] about 76, who stopped short of calling me the devil [47:51] the other day, after acknowledging that I didn't even [47:53] vote for this because it was done before I was elected. [47:56] Factually, I would not have voted [47:59] for this route had I been on the board at this time, [48:01] or voted for the other one. [48:03] The school images that we get are just -- [48:08] kind of negate all of the work that we have done to notify [48:12] the public. [48:13] You can't force people to be engaged, [48:15] but we have got to do something more, [48:18] whether if it is coordinating with Hillsborough County's sign [48:24] Department that sticks the rezone signs everywhere -- [48:27] perhaps they can, way ahead of time, [48:32] view scheduling construction, particularly near intersections [48:34] and schools, that we are posting signs saying, hey, [48:41] expect delays, explore alternative routes, [48:44] whatever it is. [48:46] We have got to find something to notify the public. [48:50] I mean, I think that it was a poor idea to not do the more [48:57] rural areas during the -- [49:00] or the more active areas during the summer [49:02] and the more rural areas during the school season. [49:05] Whatever can be done, whether if it [49:09] was from Hillsborough County's water department, [49:11] just helping notifying the public better, [49:14] I think the general public would really appreciate it. [49:17] I mean, they don't want to hear that we did something [49:20] at the rotary. [49:21] You can't force people to be engaged. [49:23] But they are just going to blame no matter what. [49:28] Whatever we are doing right now doesn't seem to be working. [49:30] 158,000 views on Facebook might be nice, [49:35] but I don't think that that's educating the actual residents [49:39] that are going to see a disruption. [49:41] Anything that can be done, I would appreciate it. [49:44] I believe that this constituent was actually the one that came [49:49] -- she said sometime last year with her daughter. [49:53] Anything that we can do, I would appreciate it. [49:57] Thank you. [50:01] Lisset Hanewicz: I don't see any other comments. [50:03] Commissioner Wostal, it's horrible to inherit a vote , [50:09] and you are not happy with the boat. [50:12] I know I wasn't for this item because I [50:13] thought some of this stuff was going to happen. [50:15] But in any event, I think our team [50:17] is trying to do the best they can [50:19] with getting the communications out. [50:20] If we can do more work, that would be great, [50:24] to let parents and schools know. [50:28] I will tell you, no one likes car lines, [50:32] and no one likes traffic getting to car lines. [50:38] Yeah, any work on this could be appreciated [50:40] so we could get the word out. [50:42] I do agree, the posts getting the views just shows people [50:44] are interested in the issue. [50:46] They probably need more communication. [50:48] Okay, I don't see any other requests to speak. [50:52] Do we have any other items, administrative matters [50:58] that any board member wants to address? [51:00] I don't see any requests to speak on that. [51:03] That means that we have reached receive and file, which requires [51:08] a motion to receive and file. [51:10] I have a motion by Commissioner Wostal and a second [51:20] by Commissioner Cohen. [51:26] >> Motion passes unanimously. [51:28] Lisset Hanewicz: Thank you. [51:29] We have come to the end of our board meeting, [51:31] I think, in record time. [51:34] We have an October scheduled meeting that is one [51:36] of the meetings that we can decide to go forward or not -- [51:40] I'm sorry, September. [51:42] I'm looking at October -- [51:43] September meeting. [51:44] I'm going to fast. [51:45] We may look to see if maybe we don't have a September [51:48] meeting, depending on what is on the agenda. [51:50] I just wanted to let the board members know about that. [51:53] With no other request to speak, this meeting is adjourned. [51:55] Thank you, all.