[0:00] 20-02 and [0:03] 20-03 [0:08] we will be reviewing those cases [0:12] and we will also review [0:16] a written decision for the board of [0:19] appeals case [0:21] 2020-1 board of education of cal [0:25] cowboy county beach elementary school [0:29] replacement project my name is jaris [0:33] spencer [0:34] i am the chair of the chesapeake beach [0:37] board of appeals [0:40] tonight is being conducted virtually [0:45] each member of the board is [0:47] participating [0:48] remotely the hearing is [0:51] being live streamed and will be [0:54] published on youtube for those [0:58] persons logged on to this meeting [1:01] or the call you will have an opportunity [1:05] to speak [1:06] and ask questions and comment for the [1:09] record [1:10] at the appropriate time [1:13] i will ask for your comment [1:17] so let me take the roll call call of [1:19] members [1:21] uh and call this hearing to order [1:26] david ferguson are you here [1:30] uh yes i'm here kelly stewart [1:34] are you here [1:42] jody whom star are you here jan [1:49] rutke are you here yes ma'am [1:56] okay let it be recorded that we have a [1:59] quorum [2:01] also with us sharon hume [2:04] who is the town clerk and secretary of [2:07] the board of appeals [2:11] frederick sussman who is the attorney [2:14] for the board of appeals [2:16] and christopher jakubiak [2:20] which is the town planner and zoning [2:23] administrator [2:26] first we will hear case 2020-02 [2:30] to consider the application from calvert [2:33] property partners [2:35] llc who is the owner and free sample of [2:38] real property known [2:40] of 8207 elm lane [2:43] for a 7.5 foot variance to section [2:48] 290-19 of the town [2:51] of chesapeake beach zoning audience or [2:55] ordinance to allow a new [2:58] house to encroach 7.5 feet [3:02] into the required 15 foot front yard [3:06] and a variance to section 20-17e [3:12] 2 to allow encroachment [3:15] into the required 25-foot non-tidal [3:19] wetland buffer [3:20] of up to 1863 [3:24] square feet plus [3:27] area of site disturbance [3:32] second we will hear case 2020-3 [3:37] to consider consider an application from [3:41] francis a [3:42] and stephanie m white owners and fee [3:45] sample [3:46] of real property known as 8203 [3:49] elm lane to allow a new house to [3:53] encroach [3:54] 7.5 feet into the required 15 [3:58] foot yard and a variance to section [4:03] 20-17e 2 [4:06] to allow encroachment into the 25-foot [4:10] non-tidal [4:11] wetland uh buffer uh plus area [4:15] uh on site excuse me [4:19] to allow encroachment into the 25 foot [4:22] non-title wetland buffer plus area [4:26] of sight disturbance [4:30] before we begin with testimony [4:35] i will ask mr sussman to swear in [4:38] everyone who intends to offer comments [4:41] and testify at these evening [4:45] at least this evening's hearings [4:48] on either case number [4:51] 20 20-2 or [4:54] case number 2020-3 [4:58] so if you wish to speak to the board [5:01] this evening [5:03] on these matters please prepare now [5:06] to be sworn in sessom [5:10] thank you madam chair everybody who [5:13] intends [5:14] or thinks they may want to speak on [5:16] either case tonight [5:18] please raise your right hand and [5:21] repeat after me do you [5:24] solemnly swear or affirm under the [5:28] penalties of perjury [5:30] that the testimony you are about to give [5:32] and the responses [5:33] and statements you are about to make [5:36] will be the whole truth [5:37] and nothing but the truth uh please say [5:40] uh yes [5:41] or no yes yes yes [5:48] well the record reflects that a number [5:51] of people i believe it was five or so [5:53] uh indicated uh that they intend to [5:56] speak [5:57] and take the oath by saying yes i did [6:00] not hear [6:01] uh any no's so i will assume that [6:04] everybody who's going to speak tonight [6:05] has been sworn [6:07] and agreed to tell the truth the whole [6:09] truth and nothing but the truth [6:11] thank you madam chair okay [6:14] now i'd like to ask the board secretary [6:17] sharon hume [6:18] to confirm that both [6:22] hearings were properly notified [6:25] and advertised as required [6:28] by town code [6:32] yes uh the property owners were notified [6:35] by letter dated [6:36] august 14th via certified mail [6:39] both properties were advertised in the [6:42] local newspaper for three consecutive [6:44] weeks beginning [6:45] august 14th and both properties were [6:48] posted [6:49] august 12th [6:53] thanks sharon this document is now um [6:58] forwarded for recording as [7:04] now let's begin with the application i [7:06] turn to the [7:07] town planner for a summary i will ask [7:12] mr jacobiak to summarize the request [7:16] in case number 20-20 2020-2 [7:22] after we've had an opportunity to ask [7:26] his questions i will ask the applicant [7:29] to introduce those members [7:32] who will be all offering testimony [7:35] and to present the case on the ordinance [7:39] once we've heard the applicant's case [7:41] variant [7:42] sorry once we have heard the applicant's [7:45] case for the variants [7:47] we will hear from anyone who may wish to [7:49] testify [7:50] on behalf of or in opposition to [7:54] the variants mr jacobiak [7:58] and applicant will be given the [8:00] opportunity to present [8:02] any additional comments on the [8:05] application [8:07] then i will close the testimony on the [8:10] variants [8:11] in case 20-2 [8:15] 2020-2 after we [8:18] are finished with the presentation of [8:21] evidence [8:23] and the public comment on variants [8:27] the board will formally begin out the [8:30] liberation [8:31] and decide on the matter [8:38] typically the board's decision will be [8:41] subject to the council to the board [8:44] preparing a resolution that documents [8:48] the board's decision [8:50] and the reason for that decision [8:57] after the board has conducted the [9:00] deliberations and actions [9:02] in case number 2020-2 the board will [9:06] proceed [9:07] in case number 20 20-3 [9:11] in the same manner [9:18] if there is no objection from the board [9:22] i'd like the applicant's application [9:25] and town planner staff report [9:29] entered into the record as exhibits [9:41] okay miss jacubina please correct [9:45] variance application [9:49] uh thank you i would prefer to [9:53] share my screen that's possible [9:59] yes okay can everyone see my screen [10:17] yes okay good um [10:21] what you see in front of you is just a [10:23] copy of the [10:25] staff memorandum dated september 2nd [10:31] and um madam chair and members of the [10:33] board my apologies for [10:36] not getting this to you sooner um [10:39] i'm glad i got it to you yesterday but [10:42] in light of the fact you may not have [10:44] had much time to read it i thought i'd [10:46] spend a little bit more time than normal [10:49] introducing the case [10:53] let me start by [10:58] showing you something i think is [11:00] interesting here [11:05] can everyone see that photograph [11:10] yeah okay this is a drone photo that [11:13] we've among many [11:14] that have been taken [11:18] of the town and uh [11:21] and used in part for our comprehensive [11:23] planning work [11:25] but i wanted to point out to you on this [11:27] map [11:28] or this image where the lots are and [11:31] just give you a sense of the [11:33] character of the neighborhood and some [11:35] of the [11:36] environmental issues issues that are [11:38] quite obvious [11:40] see my cursor moving up and down [11:42] maryland 260. [11:45] yeah i want to direct your attention to [11:47] that okay so follow me down [11:49] elm street this is elm or elm lane [11:52] sorry and it effectively dead ends here [11:55] as a public street [11:56] and i'm not quite sure where precisely [11:59] it is and i wouldn't be able to [12:01] show that on this photograph but it dead [12:03] ends and then it becomes a private [12:04] driveway that leads back [12:07] uh to mr gary coldsmith's house which is [12:10] in this area these are the existing [12:14] houses [12:14] the kind of the pattern of development [12:16] that has existed there for quite some [12:18] time [12:20] and this general area here [12:24] is where those two lots that are subject [12:27] to tonight's discussion [12:28] will be located or are proposed to be [12:30] located [12:32] the first one that's on the docket 8207 [12:37] uh is roughly here you can see this [12:40] little [12:41] bump out of asphalt um [12:44] that's well i'll show you later but on [12:47] the site plan that little bump out actually looks like [12:51] it's in the front yard [12:52] of the house that's being proposed but [12:55] so this is roughly the location of the first applicant's proposal [13:01] you can see this kind of natural [13:03] corridor here there's a wetland in there [13:05] and there's [13:06] trees and um and you can see also how [13:10] this [13:11] low-lying topography drips drops back [13:14] down to [13:16] the marshland and those who are familiar [13:20] with chesapeake beach will know that [13:22] what we see out here in terms of [13:24] marsh swamps wetlands uh [13:27] once covered all of this area so [13:30] all this area including calmest field or [13:33] certainly most of it [13:34] parking lots it's all filled it's all [13:38] made land and we know [13:42] that nature is reclaiming it slowly but [13:45] surely you can see some pockets of water [13:47] wet spots popping up [13:49] and uh we also know that the flood zone [13:52] 100 year flood zone comes right up to [13:56] that drive that i just mentioned uh [13:59] may not cross over it just yet but it's [14:01] right there [14:03] so all this area is subject to flooding [14:05] in the in the current um [14:07] scheme of things so that's where we are [14:10] we're we're challenged by a number of [14:12] environmental issues here tonight [14:14] and i just wanted to give you that [14:15] bigger picture [14:18] later why don't i do that now [14:28] i wanted to point out where the [14:31] flood zone is since i mentioned it [14:34] if you follow my cursor again [14:41] um goodness um [14:46] oh here's elm going up and down elm [14:50] uh lane now and the lots that we're [14:53] concerned about tonight are [14:54] located right here this blue hashed line indicates [15:01] the flood zone the 100 year flood zone [15:05] and the dark indicates open water [15:08] okay that's the existing condition [15:12] uh based on uh 2014 [15:15] fema floodplain mapping what um [15:19] the comprehensive plan is in part [15:22] studying right now our work on [15:24] comprehensive plan [15:25] involves study of sea level rise [15:28] and how the natural conditions in [15:32] chesapeake beach will change over time [15:35] if current trends continue and the [15:38] current trends take us up to [15:40] um uh 2.1 feet of [15:43] sea level rise elevation in the [15:45] chesapeake bay [15:46] region um by the year 2050 which is you [15:50] know effectively 30 years from now [15:52] um so over time [15:55] this is kind of the new scenario um that [15:58] we [15:59] expect again let me locate [16:02] the elm lane for you again it's on this [16:05] map it's here [16:09] a lot the lots we're talking about are [16:11] located here [16:12] they're shaded in blue now [16:15] okay um this is the edge of [16:18] predicted open water the dark blue level [16:21] area [16:22] is open water and what you [16:25] see in the various other shades of blue [16:27] are various [16:29] um levels of predicted flooding [16:33] so the 100 year flood which is the [16:37] one percent exceedance probability [16:41] um one percent chance a year for [16:44] you know flooding event that's the light [16:47] blue [16:48] and now that comes up and covers [16:51] you know kellum field quite a bit [16:55] the darker blue is the 10 [16:58] annual exceedance probability which [17:01] means in each year there's a [17:03] 10 chance of a flood [17:07] event and you can see that that area now [17:10] comes up over the driveway that i was [17:12] referring to that leads to mr [17:14] coldsmith's [17:15] place and it comes up elm lane a little [17:18] bit [17:18] and it actually covers a bit of the site [17:21] maybe all of it of what we're at least [17:24] part of it of the property that we're [17:26] talking about [17:28] that's wetland that exists now those [17:31] properties [17:34] isn't connected tidally just yet in any [17:37] physical way but with sea level rise in [17:39] the rising water levels [17:41] the this natural stream here begins to [17:43] reassert itself and this all [17:45] kind of comes back into action as a flood zone an area that's likely to [17:50] flood now i want to highlight that this [17:53] is based on maryland department [17:56] of planning and maryland climate [17:58] commission actually involved [18:00] with that is managed by or staffed by [18:02] the planning department at the state [18:04] uh and dnr and mde uh it's a predicted [18:09] flooding events of predicted um sea [18:12] level rise that's based [18:14] on other science but it's 2050 that's [18:17] the projection [18:19] this is not today this doesn't exist now [18:22] uh [18:22] at some point between now and 2050 [18:27] the various data analysis that's done [18:30] would suggest that this [18:31] is a real risk and so for for a [18:34] comprehensive plan that really provides [18:36] a good understanding of where we want to [18:38] position [18:39] land use where we want to avoid uh and [18:42] also [18:43] where we want to how we want to make use [18:46] of this information [18:47] to boards like yours to consider this [18:50] information in your judgments now of course a house [18:53] that exists here for 20 or 30 years before [18:56] this situation happens [18:58] may be perfectly fine but you know most [19:01] houses last longer than that [19:02] and we want to build sustainability into [19:06] chesapeake beach so i wanted to go [19:08] through that [19:10] summary um uh for you now back to the [19:14] staff report um [19:19] the applicant and i uh or the [19:20] applicant's engineer and i had a chance [19:22] to talk before [19:24] the final submittal was done and i [19:26] encouraged [19:28] him to move the proposed [19:31] building site forward on the lot [19:35] to get it closer to the front builder [19:39] line or the front [19:40] get it closer to the street as a way to [19:44] minimize the amount of building [19:46] and building activity that would take [19:48] place in the wetland buffer [19:51] the buffer is not the wetland the buffer [19:54] is the 25 [19:56] foot area around the [20:00] wetland it's there to signal that [20:03] something environmentally sensitive [20:05] exist and we should stay away from it [20:08] and [20:08] it also signals the fact that wetlands [20:10] move and migrate and change just like [20:13] the [20:13] images i showed you suggest they might [20:16] and the future is likely to see [20:20] that wetlands evolve and change over [20:23] time so that buffer [20:24] gives us a little leeway and a safety [20:28] margin of safety [20:32] so the um the applicant is [20:36] calvert properties partners llc [20:39] the proposal is to locate the building [20:46] seven and a half feet from the front [20:49] property line [20:51] rather than 15. [20:54] and and by virtue of that [20:59] the structure is moved out of the buffer [21:03] i'm this line that i'm coursing through [21:07] now [21:07] is the buffer [21:11] everything on this side is within the [21:12] buffer everything on this side is [21:15] outside [21:16] here is the wetland itself [21:19] the wetland the line of the wetland [21:22] everything on this side of the [21:23] line is wet wetland everything here is buffer okay um [21:30] so the purpose of the ordinance is to [21:32] move building activity [21:34] out of the buffer um [21:37] if the applicant was building within the [21:39] wetland that would be an entirely [21:41] different situation altogether [21:43] and would require a number of other [21:45] permitting agencies being involved in [21:47] this discussion [21:50] so in my [21:54] staff report as i typically do i i just [21:57] went through each [21:58] of the various standards i [22:01] called out various factors and facts [22:04] in this particular case it's just a as a [22:06] matter of correction [22:08] the applicant's proposal actually [22:10] suggests that there's going to be [22:11] 2 400 square feet of disturbance [22:14] and um and i will just ask that [22:17] the applicant discussed that to make [22:19] sure that we're all [22:22] locked in on what the proposed [22:24] disturbance is but i think it's 2048. [22:30] the one of the conclusions [22:35] i'm putting forth for you in this memo [22:38] is that you may [22:42] wish to approve this and i don't see [22:46] a lot of downside to approving it [22:49] provided that there's some care is taken [22:53] about how the building is built and [22:55] constructed [22:56] um in other words that this the [23:01] long-range planning we're talking about [23:02] in these environmental conditions [23:04] are addressed and thought about when [23:06] that building is constructed [23:08] so i suggested here that a [23:11] model that uses piles or some other [23:13] technique to keep the building [23:15] up out of wetland so and flood zone as i [23:19] mentioned so these buildings can exist [23:21] on this property [23:23] for a long time and so the town doesn't [23:25] have to [23:26] uh work with the property owners [23:29] decades from now to purchase their [23:32] property in their house [23:33] which is actually a proposal that the [23:35] planning commission is considering [23:37] uh now generally uh as a strategy [23:41] for addressing other issues in town [23:44] there this pattern of ex wetlands moving [23:47] and floodplains rising [23:49] uh has presented itself in other places [23:52] in chesapeake beach and we are [23:55] [Music] [23:58] facing the future of having to deal with [24:02] moving people out of harm's way or [24:04] watching their properties [24:06] uh continue to deteriorate so [24:09] that's um that's a quick summary of this [24:12] particular proposal [24:13] it's uh roughly seven and a half feet of [24:15] a variance [24:17] um the from the front yard [24:20] the front lot line the applicant still [24:22] will have [24:24] 2 400 square feet of uh [24:27] encroachment into the buffer uh so that [24:30] reflects [24:31] that would be a variance as well so [24:33] there's two variants decisions [24:34] to be made tonight thank you [24:41] are there any questions from the board [24:46] of mr jacobia presentation [24:53] uh dr spencer this is david ferguson i [24:56] have a question for chris [24:58] um i am not familiar with elm lane [25:03] uh i mean i know where it intersects uh [25:06] 260 but i've not driven down it [25:10] so i'm not very familiar with it but in [25:13] reading uh public comments we received from mr [25:17] coldsmith [25:18] i'm wondering about the width and the [25:21] construction [25:22] of the pavement of elm lane uh [25:28] sounds like there's maybe some question [25:29] of uh [25:31] parking space and if and if we grant the [25:34] variance to seven and a half feet in the [25:36] front [25:37] will there be room for off street [25:39] parking [25:40] and if there is no off street parking [25:43] will that [25:44] present a a problem for [25:48] uh you know trash vehicles and other [25:51] trucks that need to get up and down the [25:52] street [25:54] or emergency vehicles in that case [25:58] okay good questions um [26:02] here is elm lane [26:06] uh this is a google earth image yes the [26:10] date is 2020. [26:11] the image date is october 18th [26:14] 2019 down there uh okay [26:18] yeah um [26:21] is is it a fall too lane is it a full [26:23] two-lane [26:24] street or it essentially is until you [26:27] get down to [26:30] where the first lot is that's the [26:32] subject of our proposal is located [26:34] at this point it feels like a one-lane [26:37] street right it's fairly narrow as you [26:39] can see [26:40] um i'm certainly [26:44] applicant will have more detailed [26:46] measurements but if he just threw this [26:48] on [26:49] we got 14 feet maybe between 12 and 14 [26:53] feet [26:54] roughly um up here we have a little more [26:57] space [26:58] let's measure that [27:02] 15 feet i actually think it's bigger [27:03] than that um [27:06] well you know this is this is what it is [27:08] i'm just doing it okay um but this is that [27:12] parking area that you're referring to [27:15] these cars that are parked here i [27:18] believe belong to someone in the [27:19] neighborhood [27:21] but these are not this is not the [27:24] intention as we understand it this is [27:26] this wasn't designed for a parking pad [27:28] for [27:29] neighbors uh this was designed for a [27:32] turnaround [27:33] so if you're traveling down you realize [27:35] you're in a dead-end street [27:37] and you can't go beyond it you feel that [27:39] the road is getting narrower [27:41] uh you you think well it's time for me [27:43] to turn around you can pull into a [27:45] three-point turn and [27:46] head back up [27:50] i don't know and i've checked with the [27:53] public works chief [27:54] on this he doesn't know either exactly [27:57] when this [27:58] was constructed [28:01] but it is within the municipal [28:04] right-of-way [28:05] as far as we can tell meaning that the road is much wider now the physical [28:10] land where the road is located is much [28:12] wider [28:13] than the pavement but so this exists [28:15] today [28:16] the i see on the plan that the applicant [28:19] has [28:19] that this goes away this is essentially [28:22] is the front yard [28:24] of the proposed residence [28:27] um so that's a a matter we need to [28:31] discuss uh tonight um but that's [28:34] you know that's okay well that that's [28:38] even more complicated than i realized i was just concerned [28:43] about you know granting the seven and a [28:46] half foot variants and having the [28:48] front of the structure seven and a half [28:50] feet [28:51] from the street and the street being too [28:54] narrow to park on [28:56] where is there going to be parking for [29:00] the resident okay so [29:03] i'll i'll refer you to the site plan for [29:05] that but before i do that [29:07] remember even if the house is built on [29:10] the front property line [29:12] there is still quite a bit of space [29:14] between that front property line [29:16] and the existing street this through [29:19] the street is narrow but the [29:21] right-of-way is relatively wide [29:24] so it'll feel like a grass strip [29:26] essentially between [29:28] the front door and the street [29:31] and it won't be [29:34] as extreme as your as you can imagine so [29:37] let me just [29:38] flip to the plan [29:40] [Music] [29:50] so here's the house here's the property [29:53] line this dark line [29:58] um this says remove paved [30:02] and i will get confirmation tonight i [30:05] believe that means remove the pavement we just saw from the [30:08] overhead photograph [30:10] right but again the street is [30:14] i believe this is this see this cl [30:16] that's the center line of the street [30:18] and we know that street is very narrow [30:20] and the edge of that street is roughly [30:22] right here okay so you can see the distance is still fairly big [30:29] between the house and the actual street [30:32] even though it's [30:33] close to the front property line which [30:35] means that the town owns this [30:38] as far as parking this is the this is [30:40] the driveway that's being proposed [30:44] um the apron you know you come in and park [30:50] right right [30:51] and i would imagine there's enough depth [30:54] there for two cars to be parked [30:56] um on that now of course a share of that [31:00] is within the town's right-of-way but [31:01] that's not unusual [31:03] you have to access your property and and [31:05] there's typically an apron that's [31:07] built within the municipal right-of-way [31:09] to access [31:10] a place to put your car [31:16] okay [31:19] thank you chris this is jan breckkay hi [31:22] jan [31:23] hi there um i'm curious the pavement that's to come up that's i [31:30] assume that's the [31:33] parking pad so to speak that is south of [31:36] the [31:38] uh fire plug is that right [31:43] it's and that the the turk [31:49] it's this i don't know where the fire [31:51] exactly so [31:53] and that pavement currently belongs to [31:55] the town and it'll be the town's [31:57] responsibility to remove the pavement [32:00] [Music] [32:02] no um i don't think the town would take [32:05] on responsibility for that the town [32:07] would have to approve it [32:09] um and whoever did the work would have [32:12] to do it according to [32:14] town specifications okay [32:17] but the town i doubt the town would want [32:20] to engage itself in doing something like [32:22] that [32:26] directly [32:28] so the the turnaround that's currently [32:31] being used [32:32] as a parking place [32:35] that would the town have any [32:37] responsibility to [32:39] enhance sign it um [32:43] repave it anything like that i mean did [32:46] the town put it in i assume [32:49] well it i i'm assuming the town put it [32:53] in [32:53] but i couldn't certainly say that the [32:55] town would have authorized it or been [32:57] involved in its installation if it [32:59] didn't actually do it the work itself [33:01] um there are there's a law about [33:05] um doing improvements within the town's [33:08] right-of-way [33:09] and it's typically an item that gets [33:11] reviewed and approved by the town [33:13] engineer [33:14] and sometimes these things could go to [33:16] the mayor and town council [33:18] for specific approval but [33:21] this thing has predated me and predated [33:24] the [33:24] public works chief and we've uh and he [33:27] actually [33:28] went back to see if he could find a [33:29] record of that um [33:31] and he wasn't able to and i i don't [33:34] have any more information about it than [33:36] that [33:42] okay okay um let's let's hear from the applicant on the [33:48] matter [33:49] if you're here [33:59] good afternoon good evening folks my [34:02] name is bill watson [34:04] and i'm speaking as the person who [34:06] designed this psyc plan [34:08] and on behalf of my uh client and [34:12] applicant [34:14] for the record again my name is bill [34:16] watson that you can call me that but [34:18] my formal name is william r watson i [34:21] reside at 11215 [34:23] oakwood drive dunkirk maryland 20754 [34:28] my cell phone is [34:33] six 443-532-0866 i have [34:36] uh am a registered professional land [34:38] surveyor [34:39] have been in this business since the [34:42] summer of 1970 [34:44] longer than some people have been alive [34:47] and i still enjoy doing this type of [34:50] work [34:51] um this lot [34:54] is known as lot 31r block a of the [34:57] wickersham subdivision [35:00] that subdivision was recorded in 1911 [35:05] not 20 but 1911 and the show on the [35:09] platinum is workers from subdivision [35:12] in 1994 a replanting was done [35:17] by the then owner homes america [35:21] to combine several individual lots [35:24] into one building or actually two [35:26] building sites [35:28] and in the process of doing that [35:30] combination [35:32] the rear alley that alley to the east [35:36] had been abandoned in part or the part [35:39] that was abandoned that was adjacent to [35:41] their lot was added into the lots [35:44] and also part of friedley avenue which [35:46] is the [35:47] unopened street to the south [35:50] of the second lot which we haven't [35:52] gotten to yet [35:54] was added into that second lot so the [35:57] lots [35:58] were enhanced somewhat [36:02] the zoning as in the staff report is [36:04] residential village with a 15-foot front [36:07] 8 foot side and 20-foot rear yard [36:09] setback [36:11] critical area landing's classification [36:13] is iba [36:14] or intensely developed area [36:17] and again as i say i'm i'm answering the [36:20] two clients here [36:21] i'm working directly for barrick [36:23] associates where i'm a sub-consultant to [36:25] death [36:26] and toby olecki is on the line [36:29] listening in and will be taking over [36:33] after me [36:34] to fill in some spots that i may [36:38] not cover direct associates did a lot [36:42] stakeout [36:43] had the wetlands uh delineated [36:46] and then located those wetlands and [36:50] provided the [36:50] topographic survey all to me to do the [36:53] site design [36:55] the wetland delineation was done by [36:57] kenneth walls [36:58] of bay environment inc and that was back [37:02] in january of this year [37:06] that delineation was confirmed [37:10] by a lady by the name of mikko camp from [37:13] the maryland department of the [37:14] environment on january 16th to 2020. [37:18] her approval states quote wetlands [37:22] at the subject site will be classified [37:24] as emergent [37:25] non-violent wetlands and any [37:28] permanent impacts to wetlands will [37:31] require [37:32] mitigation and i address that mitigation [37:36] uh and permanent impacts in a couple of [37:39] places [37:40] in my presentation it should be noted [37:43] that the vegetation [37:44] in this wetland area on the site is [37:47] predominantly fragmites [37:49] which is well known to everybody as an [37:51] invasive species [37:54] the town is located northward of the [37:56] town [37:57] where the site is located northward of [37:59] the town dress coils [38:00] site which by virtue of the burns [38:03] surrounding the site [38:04] will cause the runoff from this lot to [38:06] take a longer route to fishing creek and [38:08] ultimately today [38:09] thereby giving the existing vegetation [38:11] more opportunity [38:13] to filter the runoff a critical area [38:16] responded [38:18] on august 14 to a request to give their [38:20] input on this application [38:23] and stated that they do not have any [38:24] jurisdiction over the town's local [38:27] zoning setbacks [38:28] nor does the critical area commission [38:30] have jurisdiction over impacts [38:32] for non-title wetland buffers so [38:36] given that with background as mr [38:38] chikubiak stated [38:40] we have a need for two variances the [38:42] first is the front yard setback [38:45] to be reduced from 15 feet to 7 and a [38:48] half feet [38:50] and the second is to allow disturbance [38:52] within the [38:53] 25 foot wetland buffer [38:58] now i'm going to try something i hope [39:00] works i'm going to try to [39:03] bring my drawing [39:06] of the site up [39:10] if you bear with me for a moment because [39:12] i'm going to be zooming around and [39:14] hopefully it'll be [39:15] a little bit easier for everybody [39:29] has a series of lines popped up on [39:32] anybody's screen yet [39:35] different colors okay thank you yes good this [39:42] is a background [39:46] component of this site that i [39:49] use to calculate all the various impacts [39:53] um there's just so much going on that i [39:55] put this [39:56] off to the side so to speak and did not [39:58] show it on the drawing [40:00] a lot of them in a table fashion regular [40:02] fashion [40:04] the purple line that i'm following with [40:07] my cursor [40:08] and i realized when chris was doing this [40:11] part [40:12] the screen was a bit slow hopefully [40:15] you're seeing my cursor [40:17] follow around yes we do and [40:20] now on a white line crossing the short [40:23] section of a blue line to a green and [40:25] back to purple [40:27] that is the 25 foot wetland buffer [40:31] and you see a little starburst [40:35] type pattern that would look like some [40:36] plants [40:38] within that which is in and of itself [40:42] 3422 square feet [40:45] that is the our excuses let me correct [40:50] that [40:57] so the wetland buffer is 3391 square [41:01] feet [41:01] up here at the top within that is a [41:06] piece of the driveway [41:07] shown in blue [41:11] and maybe a half of the house [41:16] shown in white [41:21] the driveway has 362 square feet [41:24] in the buffer the house [41:28] has 387 square feet [41:32] in the buffer those are the permanent [41:36] impacts to the buffer assuming that this [41:39] site gets built according to this plan [41:42] through euros approval [41:45] the green line represents [41:49] the outline of a silk fence [41:53] which is used to prevent settlement [41:57] from going too far away from a [41:58] construction site or construction area [42:01] during [42:02] a rainstorm in some places [42:05] as chris noted in his stamp report [42:09] such as in this area the silk fence [42:13] actually if i were to show the [42:15] computation i did it earlier [42:17] there's about 1.66 feet right at this [42:19] location where i'm kind of sliding my [42:21] cursor back and forth [42:23] and a little bit larger down here [42:27] the purpose of having the soap fence [42:29] where i've got it [42:31] is to in this location [42:35] keep it from getting into the wetland [42:38] which is this large area [42:40] to the north and east or to the right [42:43] and top of the [42:44] slot while [42:47] giving as much room as possible to do [42:49] the grading [42:50] to shape the lot and make drainage work [42:54] on the lot similarly with the house [42:58] which this is the part that's within the [43:01] um [43:02] 25 foot buffer we're seeing the house [43:06] floor elevation at elevation nine [43:09] the ground elevation in this area i [43:11] believe was something around [43:13] three or four um [43:16] [Music] [43:17] so it's actually 6.4 on the site plan [43:21] down in this area here so we've got the [43:24] house [43:26] ground level floor set um at 10 [43:30] excuse me rather than nine uh just short [43:33] of four feet above the ground [43:35] in this area so there's some shaping to [43:38] be done [43:39] although with a proposed crawl space [43:42] there's not a lot of shaping of the [43:44] earth to be done [43:45] other than just to be sure that the [43:47] rainfall that hits the ground [43:49] runs away from the house and doesn't [43:52] wash out alongside the house [43:56] the downhill side of the house is where [43:59] i've got the person now [44:02] that probably will be where a large [44:05] amount a larger amount of grading will [44:07] occur [44:08] just to accommodate putting in the block [44:11] foundation getting the footings down to [44:14] an elevation where they can be placed on [44:16] solid ground [44:19] probably there will be some small amount [44:21] of stockpiling in this area [44:23] other of it could be stockpiled inside [44:26] the foundation area [44:28] or possibly even over in the [44:30] southwestern or bottom left corner [44:36] the [44:39] impact of this hearing [44:42] really boils down simply to if the [44:45] buffer impact is denied this lot becomes [44:48] unbearable which i don't think anybody [44:51] wants to see happen [44:53] so we need to find a solution [44:56] that minimizes the impact to the [44:58] greatest extent [45:02] in the staff report mr jacobiak [45:04] suggested having the house [45:06] on either piles [45:10] or at least greatly elevated [45:15] tony had tony alexa fulton has talked [45:18] with the applicant [45:20] and they are not opposed to that um [45:24] obviously brings more cost in but they [45:27] see the benefit of getting the house [45:29] a little bit more up into the air and [45:31] having less [45:32] potential for uh damage to occur [45:36] and the result of a flood and this area [45:38] will flood [45:39] it did it during isabel and possibly [45:42] other hurricanes [45:44] but that was an unusual situation with a [45:47] wind-driven [45:48] hurricane with high water or high rain [45:51] blowing the bay up into the inland areas [45:55] those of you that were in the town at [45:57] the time may remember [45:59] how badly the senate's restaurant was [46:01] underwater [46:04] so those things are unusual [46:09] it's not indicative of the flood hazard [46:12] maps [46:13] which presently show no flood [46:16] area on these lots it's shown as an x [46:19] which means not impacted by floods [46:24] so if we put the house on piling [46:30] i think that helps to [46:33] minimize the grading although i haven't [46:36] had the opportunity [46:37] to study that on this plan it [46:41] allows for the possibility depending on [46:43] how high we put it up in the air [46:46] of having the parking under the building [46:49] but that is stuff that needs to be [46:50] flushed out at the time of the building [46:52] permit application [46:58] the criteria [47:02] that the zoning ordinance sets out five key questions that need to [47:09] be answered [47:11] you know in an affirmative that the [47:13] board needs to agree with [47:16] and the first is that [47:20] um granting these variances is in [47:22] harmony with the general purpose and [47:24] intent of the comprehensive plan [47:26] zoning ordinance and all department [47:28] regulations [47:29] i believe it is and for a couple of you [47:34] ms spencer chairman chairman spencer and [47:37] mrs repke [47:38] you know that i used to be a predecessor [47:40] to chris in this very role as sony [47:43] administrator [47:45] the second criteria assessed is that [47:48] it's a [47:49] use as a single family resident that is [47:52] permitted [47:53] in the residential village district [47:55] nothing [47:56] being inappropriately nothing is being [47:58] inappropriately permitted [48:01] there are a couple of special [48:03] circumstances which apply to the land [48:05] which are peculiar [48:06] in this lot and don't generally apply to [48:08] most other lots within the subdivision [48:12] these are first the lot is only 9 135 [48:15] square feet [48:16] and again remember that's after the [48:18] addition of a piece of alley to it [48:21] of that 7 451 square feet [48:25] is contained within the non-tidal [48:27] wetlands [48:28] and the 25-foot non-tidal wetlands bar [48:32] of that is almost 82 of a lot [48:38] so we're working with 18 of a moderate [48:41] sized lot [48:44] maintaining the 15 foot front yard [48:46] setback will cause more disturbance to [48:48] the buffer [48:49] whereas the goal is to minimize that so [48:52] that's justification for pulling the [48:54] house closer to the street [48:56] by seven and a half feet and again [48:58] denying the buffer [48:59] impact would make a lot unbuildable the [49:02] hardship for the development of this lot [49:05] is that the house is only a modest [49:07] three-bedroom house [49:08] a smaller wood house would have a [49:10] two-bedroom or less bedrooms [49:12] in the neighborhood where three bedrooms [49:14] are typical of a single-family home [49:17] due to the wetlands this site is really [49:19] only about a third to a half usable [49:21] as compared to any similar lot [49:24] applications of requirements with no [49:27] variance [49:27] will eliminate that usability proposing [49:30] amendments to the applicable ordinances [49:33] would constitute a type of spot zone [49:35] which also would be [49:36] it be innocuous so we're faced with [49:39] interpreting the ordinance and making a [49:42] call to decide whether to grant these [49:44] two variances [49:47] the fifth and final of the requirements [49:50] is that the granting of the variance is [49:52] necessary [49:54] for just about any use reasonable order [49:57] rise [49:58] of this lock and should be considered [49:59] the bare minimum [50:01] which will give some use back to this [50:03] lot [50:06] and because this is in a critical area [50:08] there's additional conditions [50:10] even though this is not a critical area [50:12] of the um variants i thought that it [50:14] might be beneficial to go through those [50:17] and due to the conditions and [50:19] circumstances that i've previously [50:21] described [50:23] for this lot these lots will be denied a [50:26] minimal or reasonable [50:28] and significant use of the entire lot [50:30] without the requested variances [50:32] the literal interpretation and [50:34] application of the town's critical area [50:36] program [50:37] would deprive the applicant of is [50:39] commonly enjoyed by other properties in [50:41] similar areas [50:42] within the critical area of the town [50:45] granting these variances will not give [50:47] any special privileges to this lot [50:49] that would be denied to others [50:52] approving these variances will not [50:54] adversely [50:55] in my opinion will not adversely impact [50:58] fish [50:59] wildlife or plant habitat in the [51:01] critical area [51:02] and are in harmony with the general [51:03] spirit and intent of the town critical [51:05] area program [51:07] maryland's critical area law and como [51:10] net regulations so with that [51:13] i'll entertain any questions that [51:15] anybody wants to fire at me [51:17] or otherwise i'll back out [51:20] and mute myself and turn it over to tony [51:24] to embellish our head to my testimony [51:32] are there any questions from the board [51:34] to the applicant [51:44] mr jacobiac do you have any questions [51:47] for the [51:48] applicant of comments on the [51:50] presentation [51:54] i um [51:58] well i'd first like to say that [52:01] it was one of the most candid and [52:05] thoughtful staff reports i've heard from [52:07] a consulting engineer [52:09] representing client in front of a board [52:11] of appeals in a long time [52:12] exactly i really i have to send a lot of um appreciation [52:19] to [52:20] bill watson for that uh excellent job [52:23] i mean he not only did he describe [52:27] the um the hardship that's being faced [52:31] by the applicant [52:32] here but he described the actual [52:34] conditions [52:35] that are there and didn't minimize [52:39] them at all and i was very thoughtful [52:41] professional presentation [52:44] the idea of placing this um building on [52:48] some stilts or something to elevate it a [52:50] bit [52:52] appealed to me because the the the [52:54] effect of [52:56] it has on minimizing grading and keeping [52:59] it safe and secure for the long term [53:01] um but then ultimately that's something [53:03] that you and [53:05] members of the board of appeals will [53:07] reflect on i suppose and [53:09] of course there are other issues that he [53:11] at play here too that [53:12] the citizens in the neighborhood may [53:14] raise [53:16] so i have nothing else to add unless you [53:19] have questions for me [53:25] okay we'll hear now hear from the public [53:28] sharon has anyone signed up to speak [53:31] on the variance application give me uh [53:35] madam chair i believe that there's [53:37] another uh [53:38] speaker from the applicant [53:43] is there well my name is anthony olexon [53:48] i'm the civil engineer and owner of [53:51] barrett associates here in prince [53:53] frederick maryland [53:54] um you know i i agree [53:57] and appreciate everything that that bill [54:00] put into this [54:01] um in realizing that this was going to [54:04] be a challenging lot that is [54:05] why we reached out to him um to make [54:08] sure that we found a [54:10] good solution and i think i just wanted [54:13] to reiterate a couple of [54:14] things that he mentioned is you know [54:16] it's a very constrained lot [54:18] um in the placement of the house and [54:22] um the layout of the lot and trying to [54:25] provide parking and all the other [54:26] requirements were [54:28] with the intention of one staying [54:31] out of the wetlands themselves into [54:34] minimizing any type of impact uh to the [54:38] buffer [54:39] so you know that along with [54:42] um mr jacobiak's maps and kind of some [54:44] discussion that we had before about [54:47] you know setting the finished floor [54:49] elevation on this house [54:51] was something that we absolutely [54:53] considered um [54:54] you know with a two foot sea level rise [54:58] uh being projected i guess in 2050 [55:01] uh you know it's not within a flood [55:04] plain right now [55:06] so it's reasonable to think that the [55:08] floodplain elevation [55:09] of where it is today and where it would [55:11] be in the future would raise to about [55:14] the elevation four or five so [55:17] we're trying to maintain as much [55:20] reasonable [55:21] lift of the house as possible to keep it [55:24] in compliance with [55:26] future considerations for sea level rise [55:30] as well as fema requirements um [55:34] for not flooding the house or the first [55:37] floor elevation as well [55:39] so um i just again wanted to thank bill [55:42] for all the effort that he put into this [55:44] and just kind of reiterate you know [55:47] there's been a lot of thought and a lot [55:48] of [55:48] um intention behind how this has been [55:51] laid out [55:52] in a way that allows the lot to still be [55:54] usable [55:57] chairman chairwoman spencer may ask a [55:59] question of um [56:01] yes here [56:04] yes yeah um anthony can you tell us [56:08] the dimensions of that parking pad how [56:11] deep it is [56:12] how many cars can locate on it [56:16] and anything else you can say about that [56:19] uh for the dimensions uh bill if you [56:22] could take the dimensions off of the cad [56:24] drawing that you have there [56:26] um we can give it i know the intention [56:27] was to have at least two parking stalls [56:29] there [56:31] um for uh for the [56:34] this home [56:37] this is bill watson again tony thank you [56:40] um chris bear with me i'm going to pick [56:43] a couple of dimensions [56:45] tony is absolutely correct that [56:48] the parking pad which is [56:51] 20 feet long on a lot and [56:55] 20 feet and a quarter wide on the lot [56:59] is intended to provide for two all [57:01] street parking spaces as required by the [57:03] zoning ordinance [57:07] so it's 20 feet wide you say [57:11] that's correct typical parking space is [57:14] 18 by nine [57:16] so there's a little bit of flexibility [57:18] in there uh [57:19] for for less than perfect driving into a [57:22] parking space [57:24] okay thank you you're welcome [57:27] if i may um just in case something [57:31] happens and i disappear [57:33] we're beginning to get a thunderstorm [57:34] over here in dunkirk it's moving down [57:36] and [57:37] raining um if i get cut off because of [57:40] the power tail [57:42] i'll be back as soon as i can [57:49] i am also hearing thunder here at [57:51] chesapeake beach [57:53] um well [57:56] anyway let's let's let's move on [58:01] okay [58:06] now let's hear from the public is there [58:08] anyone here [58:10] has anyone signed up sharon uh to speak [58:14] this evening [58:16] uh i only got comments from gary and i [58:19] believe [58:20] gary cole smith is on the on the meeting [58:23] i am okay [58:26] i would like to okay gary [58:32] uh gary cole smith 8200 elm lane [58:35] chesapeake beach [58:37] uh my driveway starts at the end of the [58:41] street [58:42] i bought this property in [58:45] uh 20 years ago [58:48] at the time i bought the property the [58:50] town engineer i don't remember his name [58:53] uh he was the engineer and uh zoning [58:55] administrator at the time but [58:57] uh you all probably remember him uh he [58:59] actually went over to north beach [59:01] for a while this was prior to the [59:03] current town engineer or the current [59:06] zoning administrator uh i discussed with [59:09] them before i bought the property [59:11] uh several things because i was [59:12] concerned about the dead end street in [59:14] the driveway that didn't end at the dead [59:15] end street [59:17] and we talked about the requirements of [59:19] the zoning [59:20] uh i think most of you are aware that [59:22] i've [59:24] been involved with zoning issues for a [59:26] long time in chesapeake beach [59:28] uh anyway the discussion was [59:31] several on several fronts there was [59:33] runoff uh [59:34] and the right of way for runoff [59:37] from the street of helm lane into the [59:41] wetlands [59:41] or non-tidal wetlands uh there was also [59:44] discussion on [59:46] the runoff on the east side of elm lane [59:49] that [59:50] occurs all the time and floods that that [59:52] side washes sediment [59:54] onto the parking space that had been [59:56] provided for [59:57] uh sadie uh in her at her home at the [1:00:01] end of ellen lane [1:00:02] uh so there is a real issue with [1:00:06] a a t turnaround which that paves the [1:00:09] areas you see down here [1:00:10] now uh it wasn't created for it was [1:00:13] created to [1:00:14] make vehicles be able to turn around [1:00:16] town vehicles [1:00:17] uh trash trucks uh [1:00:21] visitors who you know came down and [1:00:23] didn't realize the turn there was a dead [1:00:24] end [1:00:25] that industry has to have some means of [1:00:27] turning around that area was paid by the [1:00:29] town chesapeake beach [1:00:31] uh it was repaved by the town of [1:00:32] chesapeake beach just recently and jay [1:00:34] knows that [1:00:35] because he paved it so i don't think [1:00:38] there's any discussion [1:00:40] really true discussion about whether or [1:00:41] not there's the town utilizes the full [1:00:44] right-of-way [1:00:45] with at the bottom of the street uh [1:00:47] sadie [1:00:48] lawson's lot which was sold to her son grew up there [1:00:52] has always had parking provided by a [1:00:54] town the original [1:00:56] uh subdivision had 50-foot wide [1:00:59] right-of-ways [1:01:00] and i discussed this at length with [1:01:03] several people [1:01:04] including gerald donovan uh back when i [1:01:07] bought the property that [1:01:08] they had fifth foot right away for the [1:01:10] street because they had off street [1:01:11] off property parking because the lots [1:01:13] were so small because it was a [1:01:15] uh whatever you call it [1:01:19] a a town that was built here for [1:01:23] uh visitation or whatever recreational [1:01:25] purposes [1:01:27] so anyway uh all that being said we have [1:01:30] a grandfather's lot on the opposite side [1:01:31] of the street of this place that gerald donovan and and people prior [1:01:35] to me [1:01:36] had prepared a parking space for uh in [1:01:39] the course but they with what they [1:01:40] ballet viewed the prior [1:01:44] planning of that area uh that space is now in this plan shown to [1:01:50] be gone away [1:01:52] there's a fire hydrant on that side of [1:01:53] the street roughly near there and [1:01:56] that's the reason why the turnaround is [1:01:58] farther [1:01:59] north than than where it probably should [1:02:01] be a this official t turnaround [1:02:04] and no science has ever been put up to [1:02:06] stop parking there so people have parked [1:02:08] there [1:02:09] uh when the notices went up or when the [1:02:11] polls [1:02:12] the new poll relocation happened people [1:02:15] realized that they you know they didn't [1:02:16] have a real [1:02:17] true right to park there they parked [1:02:19] other other places [1:02:20] except for the lawson property who has [1:02:23] no place to park [1:02:24] because of their grandfather a lot so [1:02:27] the the utilization of the right-of-way [1:02:33] for any purposes like going away taking [1:02:36] the paving away so that there's no [1:02:37] turnaround anymore or [1:02:39] utilizing it as part of their driveway [1:02:42] or whatever it is a non-consideration for the existing [1:02:47] neighborhood i mean vehicles do do the [1:02:49] trash trucks people need to turn around [1:02:51] uh that's my first com real issue with [1:02:54] the [1:02:55] with this plan uh the second real issue [1:02:58] i have with the plan [1:02:59] is that the reduction [1:03:02] in front yard setback would not be [1:03:04] necessary and i've looked at this myself [1:03:06] i'm i'm a [1:03:07] commercial builder myself i looked at [1:03:09] this property myself [1:03:11] uh back when the property was up for tax [1:03:14] sales [1:03:14] numerous times i looked at what i could [1:03:16] do there and i i thought [1:03:18] every time about building it on stilts [1:03:21] just the simple impact that you had a [1:03:24] issue [1:03:24] with uh non-tidal wetlands [1:03:28] now when i look at this plan [1:03:31] uh first off the any utilization of [1:03:34] the the talents right away has to be [1:03:36] approved by the mayor and town council [1:03:39] and nobody's made an application to do [1:03:41] that so i don't know without that approval you could not [1:03:44] regret various anyway [1:03:46] uh because you'll be taking away part of [1:03:48] the streets right away [1:03:50] uh if [1:03:53] the the planner and developer [1:03:56] were to look at utilization of stilts [1:03:59] and raising the structure up in the air [1:04:01] and parking underneath i think you could [1:04:03] actually use the property [1:04:06] effectively for housing as intended [1:04:09] without impact to the buffer [1:04:13] and impact to the front yard setback [1:04:16] so i i i think that was not fully [1:04:20] uh thought through uh it was like easier [1:04:24] to apply for a variance than just to [1:04:26] design to match a lot and the final [1:04:29] thing i really want to say is [1:04:31] this thing was re-platted [1:04:34] and it was replated during a time when [1:04:37] all all these things were known and all [1:04:40] the property was one [1:04:41] was when one ownership at that time and [1:04:43] it was in one ownership [1:04:45] and all those joint properties were [1:04:48] together would make a legal lot [1:04:52] you don't have a right for a variance [1:04:53] and someone subdivided it and [1:04:55] made it into two lots that were actually [1:04:58] unbuildable so they created their own [1:05:00] problem [1:05:01] in i think was it 1994 [1:05:05] in the replanting uh so i i i really [1:05:08] uh at i'm i i am really against this [1:05:12] as is fans right now if they were to [1:05:15] redesign it put the house on stilts not [1:05:17] impact the front yard setback create a [1:05:20] means for [1:05:21] turn around address the [1:05:24] parking issue for uh the [1:05:28] house of the end of the road lost his [1:05:29] home on the end of the road [1:05:31] uh i could i could uh [1:05:35] i would not be an objection but uh that [1:05:38] they haven't addressed any of these [1:05:39] things [1:05:39] and i actually don't see where they've [1:05:41] adjusted off street parking [1:05:43] directly on both lots that are up for uh [1:05:48] these two variances uh the the property [1:05:51] i'm talking about that has [1:05:52] was grandfathered and does not have [1:05:54] parking and it has no way of creating [1:05:56] parking [1:05:57] is 8202 elm lane [1:06:00] it used to be the city lost this [1:06:02] property uh [1:06:03] it's now calvin lawson and his wife's [1:06:05] property [1:06:06] uh so uh they're all those things need [1:06:10] to be addressed before i think you can [1:06:11] even consider [1:06:12] granting either one of the two variances [1:06:14] are up before you for those two [1:06:15] properties [1:06:16] thank you for your time [1:06:30] is there anyone else [1:06:35] on this call that would like to speak on [1:06:37] this matter or ask questions of the [1:06:39] applicant [1:06:45] if so now is your time [1:06:57] okay does the applicant have any [1:07:01] cross-examination [1:07:02] of any of the previous speakers [1:07:06] uh yes madam chair uh this is anthony [1:07:08] olux and again i [1:07:10] you know like to address i guess a [1:07:12] couple of [1:07:13] the comments that mr cole smith made [1:07:18] the purpose of the variances that we are [1:07:21] requesting in this case is in order to [1:07:25] minimize impacts to the wetland buffer [1:07:30] [Music] [1:07:31] the as mr watson mentioned nearly [1:07:35] 84 of this lot is encumbered by the [1:07:38] buffer itself [1:07:41] the house was located in a situation or [1:07:43] in a location to keep it out of the [1:07:46] wetlands [1:07:47] uh and you know [1:07:51] looking at shifting it further back [1:07:55] would would just [1:07:56] create more of a disturbance to the [1:07:59] wetlands buffer [1:08:01] uh really that's you know i think the [1:08:04] crux of [1:08:05] what it is that we're asking for as part [1:08:07] of this waiver [1:08:09] are the two waiver requests is to [1:08:12] find a solution here that would minimize [1:08:15] those impacts [1:08:17] and the owner and [1:08:21] their builder representative are also on [1:08:23] this call today and they can kind of [1:08:25] you know i like to give them the [1:08:26] opportunity to talk if they'd like [1:08:30] um you know raising it up on stilts is [1:08:32] our own pilings is something that we're [1:08:35] considering uh moving forward i think it [1:08:37] takes a little bit more but [1:08:39] even with raising it up uh the area [1:08:41] that's going to be underneath of the [1:08:43] house [1:08:43] will still be graded would still be [1:08:46] considered a permanent impact to the [1:08:48] buffer [1:08:49] uh so the design that we're showing here [1:08:53] in the location that we're showing here [1:08:56] with the reduced setback um [1:08:59] is the minimal amount [1:09:03] of impact and that's necessary [1:09:06] in order to keep this as a usable lie [1:09:10] regarding the work within the [1:09:12] right-of-way and the removing of the [1:09:14] pavement [1:09:15] and the turnaround uh you know i agree [1:09:18] with [1:09:18] mr coldsmith is saying is is that [1:09:20] something that we need to work out [1:09:22] with the town engineer [1:09:25] and with work within their public [1:09:27] right-of-way [1:09:28] uh but i do not believe that impacts [1:09:32] what we would be requesting with this [1:09:34] waiver [1:09:35] uh just for the simple fact that there's [1:09:37] nowhere else [1:09:39] to place the house without being in the [1:09:41] wetlands themselves [1:09:57] do either mr jacobiak or the applicant [1:10:00] have any [1:10:01] final comments [1:10:10] if no [1:10:15] i will close this this part of the [1:10:17] meeting [1:10:18] uh and we'll turn our attention to [1:10:20] deliberation [1:10:22] on the variance application in case [1:10:24] number [1:10:28] 2020-2. [1:10:30] chairman yes may i [1:10:33] uh address the comments that were made [1:10:35] on my addre [1:10:44] one of the requirements for our variants [1:10:46] is that it cannot be self-created [1:10:48] and unfortunately the original owners [1:10:51] in 1994 created part of this problem [1:10:54] because as the ordinance read back at [1:10:56] that time you [1:10:58] had the opportunity to combine lots and [1:11:00] create a legal lot [1:11:02] and met the requirements of the zoning [1:11:04] ordinance [1:11:05] and instead they subdivided and made two [1:11:07] illegal lots [1:11:08] basically so i i you know [1:11:12] i wasn't going to bring that up because [1:11:14] i i thought that was like kind of [1:11:15] underhanded but [1:11:16] it was 1994 and these ordinances all [1:11:19] went in place [1:11:20] in the 80s so it is self-created in that [1:11:24] respect [1:11:25] um [1:11:29] let's see uh when you park under the [1:11:32] house [1:11:32] even though you're impacting uh the area [1:11:35] under the [1:11:36] house with imper previous the impervious [1:11:39] area is actually above the house the [1:11:40] roof line [1:11:42] so you're not creating any additional [1:11:44] impact [1:11:45] in what the footprint of the house is if [1:11:46] the parking is under the house [1:11:48] so you put on stilts and you create [1:11:50] parking under the house [1:11:51] you're not creating any additional [1:11:53] impact so i i disagree with that [1:11:55] statement [1:11:56] and uh as i said before i think that [1:12:01] before you can grant a variance for [1:12:03] anything that in respect to [1:12:06] the uh [1:12:10] front yard setbacks you have to address [1:12:12] the issues of the street and the town [1:12:14] would have to [1:12:16] first of all allow the the redesign of [1:12:20] their their uh right away [1:12:24] they usually read utilization of their [1:12:26] right of way and that requires the the mayor to approve [1:12:30] it [1:12:30] and that has not been done yet so this [1:12:33] plan [1:12:34] that they have you know it could be you [1:12:36] can approve it contingent to [1:12:38] those approvals if you were to so desire [1:12:42] uh and the same with water runoff on the [1:12:45] east side of elm lane uh i don't know you we had like a [1:12:49] conservative rain the other day and [1:12:51] probably no one knows but me because i [1:12:53] drive up there every day [1:12:54] is that but there's an incredible amount [1:12:56] of runoff on the east side of the road [1:12:58] that's never been addressed [1:13:00] and the uh former uh [1:13:04] talent administrator uh james parent and [1:13:07] i had [1:13:08] he had actually visited out there with [1:13:09] me about that and i have talked to [1:13:12] um jay about the same same issue is that [1:13:15] there's an incredible amount of runoff [1:13:17] on that side of the road and there's no [1:13:19] there's been no adjustment that and the [1:13:21] way you have it drawn right now [1:13:23] water coming down that side of the road [1:13:25] would run into f [1:13:26] at a seven and a half foot [1:13:30] uh front yard setbacks water coming down [1:13:32] the road would have no place to go but [1:13:33] run into that house [1:13:34] that home so that that really needs to [1:13:37] be addressed the [1:13:38] runoff on the east side of elm lane has [1:13:41] never been addressed [1:13:42] and it's not addressed in these plans [1:13:44] thank you for your time [1:13:57] i'd like to now hear from [1:14:01] the board there any comments from the [1:14:15] board [1:14:23] doris i i have a observation [1:14:27] yes um [1:14:30] i drove down elm street today [1:14:34] and sat in my car and and uh and sort of [1:14:37] scouted the area and relative to [1:14:42] water runoff i i can only imagine by [1:14:46] looking at that lot that that would be a [1:14:48] huge [1:14:49] problem so i i agree with mr sussman [1:14:52] that somehow [1:14:54] that water is going to come down at that [1:14:56] you know at a tremendous force coming [1:14:58] down [1:14:59] lane uh elm lane which is very steep [1:15:02] in the beginning off of bayside road so [1:15:04] i would think that there needs to be [1:15:06] some significant uh [1:15:10] that the applicant needs to address that [1:15:13] significant problem [1:15:16] um you know before before we could look [1:15:18] to approve it [1:15:30] okay any other comments [1:15:34] yes madam chair david ferguson here um [1:15:37] regarding uh mr cole smith's [1:15:40] assertion that this was a self-created [1:15:44] problem by subdividing a large lot into [1:15:48] two smaller lots [1:15:50] are either of the applicants [1:15:53] for these two cases uh [1:15:59] 2020-2 and 2020-3 [1:16:02] are either of those applicants [1:16:06] the owner of the larger lot [1:16:09] that subdivided it back in 1994 [1:16:14] and i don't know if anyone here would [1:16:16] know that [1:16:17] but mr coldsmith may know who who owned the [1:16:23] property [1:16:24] and subdivided it but it seems to me [1:16:28] uh mr sussman that [1:16:31] the current owners unless they were the [1:16:34] owner [1:16:34] that subdivided it the current owners [1:16:37] are not responsible for [1:16:40] that uh subdivision [1:16:44] mr sussman yes well i believe i heard [1:16:48] and somebody can correct me [1:16:50] that homes for america owned the [1:16:52] property [1:16:53] and then uh subdivided it uh by a rock [1:16:56] consolidation [1:16:58] into those two watts back in 1994. and [1:17:02] i believe you're correct mr ferguson [1:17:04] that these [1:17:05] uh the current owners if that if that's [1:17:08] the case [1:17:09] uh are not necessarily uh [1:17:12] responsible for any uh [1:17:17] failure of the rot to meet current [1:17:19] standards and i'm not even sure [1:17:21] that it was the real subdivision that [1:17:24] caused the problem [1:17:25] uh the current problem i think at least [1:17:27] with respect to this particular lodge [1:17:30] you know we've seen how the topography [1:17:33] and the uh environmental conditions [1:17:35] impact [1:17:36] the development there's been no evidence [1:17:39] thus far to show what [1:17:42] the overall [1:17:45] parts look like and also whether [1:17:50] a house could have been built or could [1:17:53] be built [1:17:54] with less impact on the environmental [1:17:57] conditions [1:17:58] have the property not been subdivided [1:18:01] into two rods [1:18:02] back in 1994. [1:18:06] what you have before you what you have [1:18:08] before you are [1:18:09] two applications for variances for the [1:18:12] construction of hot of watts [1:18:14] on two construction of homes on two [1:18:17] watts [1:18:17] that are by all accounts and of [1:18:20] themselves [1:18:21] a lot today it's not a situation where [1:18:24] the lots were subdivided [1:18:26] into uh well let me strike that so i'll leave my [1:18:32] comments where they were [1:18:35] i'm chairman may i yes please [1:18:39] the original property owner was homes [1:18:41] america that [1:18:42] gentleman transferred the property to [1:18:44] his himself [1:18:45] at some point or his estate and then the [1:18:48] property went to his family [1:18:50] as as someone member of his family so [1:18:53] the property was [1:18:54] in ownership by the same person when it [1:18:57] was subdivided and created the problem [1:18:59] and then however how it got it's still [1:19:01] within the same family [1:19:03] unit i don't know the actual uh [1:19:06] relationship but at least unless unless [1:19:09] the [1:19:10] these have changed uh the my review [1:19:13] prior to this [1:19:14] hearing was that that is a [1:19:18] family um [1:19:21] buy it or whatever i don't know it's all [1:19:23] within the same family [1:19:25] so it's an inheritance i guess or a uh [1:19:29] a trust that that i think they did [1:19:32] so uh i don't necessarily agree with the [1:19:36] uh [1:19:37] with the attorney's uh opinion on that i [1:19:39] think that that [1:19:40] it was it is and was family uh [1:19:43] property and i don't i they [1:19:47] town has some responsibility in that [1:19:48] because that's when they allowed that uh re-subdivision [1:19:54] uh that you know the constrictions were [1:19:56] still there at that time so [1:19:58] you know they have the they have the [1:20:00] right to build on the lot but they have [1:20:02] a responsibility to live within build it [1:20:04] within the means [1:20:05] that the law allows and it's not [1:20:08] certainly not utilization of the [1:20:09] existing right-of-way and it's certainly [1:20:11] not [1:20:12] uh encroachment on [1:20:16] these restrictions that they already [1:20:17] knew was there [1:20:19] thank you [1:20:23] madam chairman this is bill watson may i [1:20:25] try to clear up some of the [1:20:26] misconceptions here [1:20:29] yes you may thank you [1:20:33] in 1994 holmes america was the owner of [1:20:36] these lots [1:20:39] and at that time [1:20:43] rickerson's subdivision consisted of a [1:20:45] bunch of 25 foot by 100 foot lots [1:20:49] this site lot 31r and 32r [1:20:53] consisted of a handful of those 25 by [1:20:56] 100 foot or larger [1:20:58] lots the zoning ordinance [1:21:03] is silent on the term replay [1:21:07] and it got started being bandied about [1:21:10] uh while i was owning administrator but [1:21:12] this was something prior to me when john [1:21:14] hoffman was the [1:21:16] host the administrator of the town [1:21:17] engineer [1:21:19] this obviously went through the planning [1:21:21] commission jim barrett [1:21:22] as the chairman of the planning [1:21:24] commission signed it [1:21:26] he went to all other agencies including [1:21:29] the health department even though it's [1:21:30] on public war and sewer [1:21:32] and it went to record um [1:21:36] no um subdivision really occurred [1:21:41] all that occurred was grouping lots [1:21:44] into building sites and [1:21:50] using one new line of division [1:21:54] along the center line of a sewer line [1:21:56] which [1:21:57] made only perfect sense to have that run [1:21:59] down the division line between [1:22:01] two building sites so that you don't [1:22:03] have somebody trying to build a house [1:22:05] over top of an existing sewer [1:22:07] and you may or may not be aware but that [1:22:09] sewer line has been very problematic [1:22:11] over the years [1:22:13] so if anything these [1:22:17] watts as we call them today 31 [1:22:21] 32r have been made larger they were done [1:22:25] through proper review and approval by [1:22:28] the planning commission of chesapeake [1:22:29] beach [1:22:31] and do it recorded in the land records [1:22:33] they were not a subdivision where you [1:22:35] take [1:22:36] a single piece of property and create [1:22:39] multiple pieces of property [1:22:41] they were combining multiple pieces into [1:22:44] lesser pieces that's the idea of [1:22:47] replanting [1:22:48] thank you at this time [1:22:53] um i'd like to hear [1:22:57] um if there's more from the board if not [1:23:04] um [1:23:08] madam chair this is prince sussman [1:23:12] yes sir yeah uh may i know it's a little [1:23:15] bit [1:23:16] out of order but may i ask mr jacoby [1:23:19] asked a question about process [1:23:23] yes you may uh mr takubiak [1:23:26] with respect to the issue about [1:23:28] stormwater management [1:23:30] and stormwater runoff is that something [1:23:33] that would typically be addressed [1:23:35] at the building permit stage [1:23:39] yes um after this project were [1:23:42] if it were approved it would come to me [1:23:44] as a a [1:23:45] site plan application it would be [1:23:48] reviewed by me and the town engineer [1:23:52] if it were approved uh it would [1:23:55] obtain a zoning permit and then a um [1:23:59] an application would be made for a [1:24:00] building permit [1:24:02] so these types of impacts would be [1:24:04] evaluated [1:24:06] by professionals at that time before any [1:24:08] permits were issued [1:24:13] and with respect to the use of the [1:24:16] public right-of-way [1:24:17] is that something that also would be [1:24:19] evaluated [1:24:20] at the time of building permit [1:24:24] absolutely [1:24:27] in fact what we do now is whenever [1:24:30] there's a proposal for [1:24:32] the addition of any improvement [1:24:35] in a right-of-way like a driveway apron [1:24:38] we refer to the town public works and [1:24:41] town engineer [1:24:42] and i can assure you that this would be [1:24:45] referred [1:24:46] to those uh individuals right away once [1:24:48] it [1:24:49] arrived at on my desk [1:24:52] thank you [1:24:59] okay um is there any more discussion [1:25:03] from the board [1:25:04] i i have one more question for mr [1:25:07] jacobiak [1:25:08] uh dave ferguson here [1:25:13] along the same lines uh mr jacobiak the [1:25:17] uh removal of the pavement [1:25:21] that is currently the turnaround from [1:25:24] that right of way uh [1:25:28] in front of this this property [1:25:31] um that um [1:25:36] would also need to be approved as part [1:25:38] of the building you know [1:25:42] application the uh permit application [1:25:47] in the sense that it's located in the [1:25:49] municipal right-of-way [1:25:52] and it's work being done in the right of [1:25:54] way yes it would have to be approved [1:25:57] um i um you know the town [1:26:00] doesn't have its own streets and roads [1:26:03] ordinance [1:26:04] we adopt the calvert county road [1:26:07] ordinance [1:26:09] and in the calvert county road ordinance [1:26:11] there is discussion of a t [1:26:12] turnaround as a [1:26:15] solution to dead end streets and new [1:26:18] subdivisions [1:26:20] but even reading that one would suggest [1:26:23] it's not required [1:26:24] at this level however the town engineer [1:26:27] may say [1:26:28] we need that we need to see it on this [1:26:31] plan or we need to see [1:26:33] how this public improvement [1:26:36] would be the loss of the public [1:26:38] improvement be mitigated [1:26:41] by the person removing it right so it's [1:26:43] quite possible that this would be an [1:26:45] issue and a concern and a condition of [1:26:47] final approval [1:26:48] by myself as zoning administrator but [1:26:52] it's going to take review by [1:26:53] the town engineer uh and some discussion [1:26:56] about [1:26:57] traffic flow how often is it necessary [1:27:00] is there [1:27:01] does it warrant a turnaround [1:27:04] you know those can we manage it in [1:27:06] different ways does the driveway that [1:27:08] the applicant's providing provides [1:27:10] sufficient [1:27:12] means for someone to pull in and pull [1:27:13] out which is quite typical on a dead-end [1:27:16] street [1:27:16] at low volumes like this so all those [1:27:19] discussions would be [1:27:20] had at that time [1:27:24] it seems to me that you know that is [1:27:27] something the town will have to deal [1:27:29] with [1:27:30] i agree and uh you know that's [1:27:34] going to be a whole different matter um [1:27:38] but i i certainly think it it needs to [1:27:41] be addressed for that for that [1:27:43] neighborhood [1:27:45] actually appreciate mr coldsmith [1:27:47] bringing it up because [1:27:48] it really wasn't apparent to a lot of us [1:27:51] we don't get there very often [1:27:52] and uh it didn't show up in a first [1:27:54] cursory review of the aerial photography [1:27:56] then all of a sudden [1:27:57] boom there it was and it it predates all [1:28:01] of us [1:28:01] so um you know it's not used often [1:28:05] except for parking which wasn't its [1:28:08] desired intent [1:28:10] but we're concerned about it and would [1:28:13] want to make sure that somehow it's [1:28:15] addressed i don't know what the solution [1:28:16] is [1:28:17] but in fact if the board of appeals [1:28:20] provided guidance to us in a decision that we would act on [1:28:25] it and [1:28:27] even provide reports back to the board [1:28:28] if it was necessary [1:28:32] yeah i i'm ready to entertain the motion [1:28:36] i have one question madam chair [1:28:39] well actually several uh this is frank [1:28:42] white fw contracting i own the second [1:28:44] lot [1:28:46] uh first law is owned by one of my [1:28:47] customers and the second lot was owned [1:28:50] by me for [1:28:50] a second customer [1:28:54] and we had an email today about the [1:28:57] possible raising of the house and [1:28:59] i don't have a problem with that [1:29:01] whatsoever [1:29:02] uh if we raise it and there's parking [1:29:05] underneath [1:29:06] i'm willing to work with the town on [1:29:07] that i don't have a problem with that um [1:29:11] the property was actually bought by [1:29:12] homes america the wife [1:29:14] herself uh extremely lovely woman very [1:29:17] hap very nice [1:29:18] person uh so we bought the hat we bought [1:29:22] the property based on [1:29:23] our customers because they love the [1:29:26] street they love the neighborhood they [1:29:27] love the town and [1:29:28] where they want to live and [1:29:32] of course we had a scurry around today [1:29:34] based on the email [1:29:35] we got today based on placing the house [1:29:38] forward backwards [1:29:39] raising it just so many things at the [1:29:42] last what [1:29:43] four hours before the meeting and i [1:29:45] don't have a problem working with [1:29:47] that at all um as far as the parking is [1:29:51] concerned [1:29:52] the the parking that's there now um [1:29:55] again it's supposed to be a turnaround [1:29:58] not parking [1:29:59] and the picture that was shown earlier [1:30:02] shows three cars and there's typically [1:30:04] five cars there um so [1:30:07] when i bought a lot before the one lot [1:30:10] my customer bought the other lot [1:30:12] uh i scoured the neighborhood to find [1:30:14] out who owned the property ruined the [1:30:16] cars [1:30:17] to sort it out and the neighbor directly [1:30:20] across the street [1:30:21] that doesn't have a driveway he [1:30:23] apparently owns all the cars [1:30:26] um and i told him we'd have to work with [1:30:28] him trying to sort it out because i [1:30:29] didn't know [1:30:31] who paved it who didn't pave it i was [1:30:33] trying to sort all out i've got several [1:30:34] houses in north beach i'm building [1:30:37] i was told from the neighbor that [1:30:40] the town paved it but then the town told [1:30:43] me [1:30:44] he paved it so i don't know who paved it [1:30:47] um [1:30:48] i thought it was just a part a spot for [1:30:51] him to park [1:30:52] but now i realize that this is supposed [1:30:54] to be a turnaround well [1:30:58] if there's five cars parked there for [1:31:00] starters [1:31:01] and even if i move the turn around to [1:31:04] the end of the street [1:31:06] who's to say four or five more cars [1:31:08] won't park there [1:31:11] so who who's going who's going to [1:31:12] enforce that um [1:31:14] i have no problems working with the town [1:31:17] on this [1:31:18] along with barrett uh this is why i [1:31:20] hired them [1:31:22] um and again we're just trying to [1:31:25] build a home for people that's pretty [1:31:28] much it um [1:31:30] well thanks a lot uh appreciate it um [1:31:36] we're closing uh the comment period now [1:31:39] and the board needs to go into [1:31:42] deliberation [1:31:46] at this time [1:31:52] thank you [1:32:02] would like to go first [1:32:16] madam chair david ferguson here uh [1:32:20] you know it seems to me that the owners [1:32:23] of the lots [1:32:24] are uh you know working with their uh you know engineers and and [1:32:32] developers to try to find a way to [1:32:36] work within the wetlands setback [1:32:39] and the uh um [1:32:42] set back from the street and from the [1:32:44] town right of way [1:32:46] um and you know i was impressed by mr [1:32:50] watson's presentation and the work he's [1:32:53] done on [1:32:54] looking into the the drainage and the [1:32:56] wetlands and the silt fence and [1:32:59] you know trying to preserve the [1:33:02] environment [1:33:04] and i also appreciated uh [1:33:08] um uh [1:33:11] i'm sorry your your name is steph on the [1:33:14] screen uh [1:33:16] stevenson i think but anyway i [1:33:19] appreciated your input [1:33:21] um that's my stage name it's okay okay [1:33:24] and i appreciate it and by the way i you [1:33:27] know i've never really done this [1:33:28] viral video thing but uh i don't mind [1:33:31] saying i look pretty good on here i [1:33:32] don't know about you guys but [1:33:34] well thanks anyway and so uh [1:33:38] you know appreciate the willingness of [1:33:40] the applicants [1:33:42] to uh uh you know build on pilings [1:33:46] or you know do what they need to [1:33:49] mitigate the environmental impacts [1:33:52] my only concern with the application [1:33:58] before i had it explained to me was the [1:34:01] seven and a half foot variants from the [1:34:03] setback [1:34:04] because i thought it was going to put [1:34:06] the front of the house seven and a half [1:34:07] feet from the street [1:34:09] uh which on a very narrow lane uh [1:34:12] you know i think is inviting problems [1:34:14] but since there is [1:34:16] that's actually a seven and a half foot [1:34:18] setback [1:34:19] from the 50-foot wide uh town you know right-of-way easement [1:34:27] uh so you know that's of a little less concern to me now so i think uh you know for me [1:34:37] uh i think i could be willing to approve [1:34:42] the uh the variance uh to the setback [1:34:45] and to the [1:34:46] wetland buffer uh with a condition that [1:34:50] the [1:34:50] homes be built on pilings uh [1:34:53] and that there be off street parking [1:34:56] provided [1:34:57] and uh also that [1:35:00] they work with the town to address the [1:35:03] turnaround [1:35:04] issue on the street so that's that's my [1:35:12] input [1:35:19] you're muted sorry am i moving [1:35:25] i'm unmuted now um [1:35:30] i i thought better about things uh about [1:35:33] the variances being asked for when [1:35:37] chris made it clear that stormwater [1:35:39] management [1:35:40] um you know and that kind of thing is [1:35:44] going to be addressed at a later stage [1:35:46] that's not something that if i [1:35:48] understand correctly [1:35:49] that we need to address or make as a [1:35:52] condition [1:35:53] is that correct chris [1:35:59] well uh madam chair this fred sussman [1:36:03] may i speak for a moment all right let me just make this [1:36:08] observation with russia and members of [1:36:10] the board [1:36:11] if the board is inclined to [1:36:14] uh grant or ask me to prepare a [1:36:17] resolution [1:36:18] to approve the variances then what i [1:36:21] would do is [1:36:22] uh prepare a series of proposed [1:36:26] conditions [1:36:27] for all of you to review and consider [1:36:29] based upon what we've [1:36:31] heard you know uh tonight during the [1:36:33] hearing and then [1:36:35] yeah you can see whether you're [1:36:36] satisfied with conditions whether you [1:36:38] want to erupt eliminate any or add any [1:36:41] but at least that will give you [1:36:42] something to look at [1:36:44] and uh uh it will be more than just [1:36:47] an approval being approval subject to [1:36:50] abcde [1:36:53] okay that that makes a lot of sense i'm [1:36:55] more comfortable with that i think [1:36:59] are you willing to make a motion to that [1:37:01] effect again [1:37:04] i'm sorry darris are you speaking to me [1:37:06] yes [1:37:09] are you willing to put that in the form [1:37:11] of a motion [1:37:13] uh madam chair may i help out [1:37:17] always thank you yeah uh [1:37:20] you based on what i just heard uh you [1:37:23] may want to entertain [1:37:25] a motion from a member of the board that [1:37:27] the board [1:37:28] direct counsel to the board to [1:37:32] prepare a resolution to grant the two [1:37:35] variances and along with [1:37:38] uh conditions that council may recommend [1:37:42] based upon the evidence and testimony [1:37:45] presented at the hearing [1:37:51] well i would certainly like to make that [1:37:52] motion [1:37:54] jody did you have any comments yeah [1:37:57] before jan gets started um uh before you [1:38:00] go with this [1:38:01] the conditions um i'm of the opinion [1:38:03] that conditions are not necessary here [1:38:05] um i think that the next step in the [1:38:08] process where [1:38:09] the building goes for its own goes to [1:38:12] chris as the zoning administrator and [1:38:13] the town engineer [1:38:14] uh sufficient and that they will handle [1:38:16] uh any any kind of conditions we put on [1:38:19] in this meeting here um i find thus far [1:38:22] that are [1:38:24] it's not really our responsibility as [1:38:26] the board of appeals to re-evaluate the [1:38:28] lot consolidation of 94. all of the [1:38:32] proposals put forward [1:38:34] by the engineers and planners i believe [1:38:36] are very reasonable given [1:38:38] the zoning of this particular lot [1:38:41] i do hear the uh complaint from mr [1:38:45] coldstone about [1:38:46] colt smith about the right-of-way and [1:38:48] the t turnaround [1:38:50] um but once again i don't i don't think [1:38:52] that falls [1:38:53] into the jurisdiction of the plan [1:38:56] propose us here today um [1:38:58] so i think i i would like to move [1:39:01] forward without conditions [1:39:03] on uh this particular uh issue but that [1:39:06] i will take other opinions on that [1:39:10] jody this is dave i i would have to [1:39:12] disagree with you on the conditions [1:39:14] uh because if we're going to [1:39:17] in particular on the the wetland buffer [1:39:21] if we're going to uh grant [1:39:24] uh you know a variance to that very important environmental buffer [1:39:31] i think there need to be conditions [1:39:33] you know such as uh you know [1:39:36] building on pilings when you consider [1:39:40] the uh 2050 uh projected floodplain that [1:39:46] mr jacubiak showed us i think it needs to be you know for the [1:39:51] house to be viable 30 years from now [1:39:55] uh you know in an area that will be [1:39:59] very likely subject to you know a lot [1:40:01] more flooding than it is today [1:40:03] i i think that needs to be a condition i [1:40:06] would hate to see [1:40:07] a builder build a a place [1:40:11] that in the future uh [1:40:14] you know science tells us is likely to [1:40:16] be flooded [1:40:17] i i entirely agree with you i i think [1:40:20] the incentive structure here is that [1:40:22] uh the builders and the owners and the [1:40:24] engineers and all the people with [1:40:25] expertise in this room [1:40:27] are not going to try and build a house [1:40:28] that's underwater 20 years from now [1:40:31] i don't want to tie their hands with [1:40:34] artificial restrictions [1:40:35] when we don't have the full lay of the [1:40:38] land so to speak [1:40:40] i think that's our job i think that's [1:40:42] our job to be sure [1:40:44] that they meet those conditions if we're [1:40:46] going to grant [1:40:48] a variance variants that putting in [1:40:52] pilings is the engineer's best [1:40:55] recommendation [1:40:56] given what they know when they get on [1:40:58] the ground and start building [1:40:59] um i'd like to leave it up to their [1:41:01] expertise to build a house [1:41:03] for their customers and clients that [1:41:05] last a long time [1:41:07] um and not necessarily try and guess [1:41:09] being that that is not [1:41:10] my area of expertise but i i do [1:41:13] appreciate your thoughts [1:41:14] and i'm not dismissing them i entirely [1:41:16] agree [1:41:17] um trying to plan ahead for things we [1:41:20] don't know [1:41:21] i think is where i get a little hesitant [1:41:34] i guess you and i are gonna have to [1:41:36] agree to disagree on that [1:41:39] well uh this is jan again uh could i ask [1:41:42] chris [1:41:43] to clarify for [1:41:46] us what's you know if we approve this [1:41:50] variance [1:41:52] what this builder now has to go through [1:41:56] whether it's stormwater management [1:41:58] whether it's you know anything [1:42:01] else related to this law because if if [1:42:04] that's going to be handled by somebody [1:42:05] else then it's not something that we [1:42:07] i said storm water management i really [1:42:09] meant everything to do with this law [1:42:12] the practice practicality of it um [1:42:15] if these things are going to be [1:42:16] addressed at a later time that's [1:42:18] i guess that's what i'm asking of chris [1:42:21] what is going to be [1:42:22] what specific things relative this lot [1:42:25] are going to be addressed at a later [1:42:27] time that we could [1:42:29] step back and say we approve it but yet [1:42:32] we would know that it would be [1:42:35] handled uh appropriately up the line so [1:42:38] to speak [1:42:42] um [1:42:46] these lots are in the critical area [1:42:49] so they're subject to a heightened level [1:42:52] of review [1:42:54] um because they're in the critical area [1:42:57] they will be subject to the [1:43:00] review by the county uh for grading [1:43:03] permits [1:43:05] and the county will review [1:43:08] the grading plans um [1:43:11] the the fact that [1:43:14] the applicants are considering putting [1:43:16] them on piles the building or the [1:43:18] building on a pile here [1:43:20] pilings suggest to me that the amount of [1:43:23] grading was going to be [1:43:24] a lot less which is something that i'm [1:43:28] pleased to see um and we'll look to that [1:43:32] to make sure that the grading [1:43:34] complies with um the the [1:43:38] stormwater management regulations and [1:43:40] sediment and erosion control regulations [1:43:42] that the the county administers so a lot [1:43:44] of these environmental reviews will be [1:43:47] done by the county the one thing that [1:43:50] was offered as testimony tonight was [1:43:52] that there's [1:43:54] and i think um ms redeke you picked up [1:43:57] on it [1:43:57] was there's water coming down elm lane [1:44:01] presumably from north right [1:44:04] and that this property may not even [1:44:06] impact that [1:44:08] but it may be impacted by it right so [1:44:11] the [1:44:11] applicant will certainly have a [1:44:14] an interest in making sure that it's not [1:44:16] flooded out [1:44:17] when water comes down that road and we [1:44:20] will too [1:44:22] um and we'll be very careful to make [1:44:23] sure that [1:44:25] the project is designed in such a way as [1:44:28] to capture divert or otherwise minimize [1:44:31] the issue [1:44:31] which may in effect help resolve it for [1:44:34] the benefit of [1:44:35] the entire community quite frankly um [1:44:37] although it's not necessarily their [1:44:39] obligation to do that [1:44:41] we certainly don't want water washing [1:44:44] out a lot [1:44:45] um so there's this physical um [1:44:49] regulatory steps will be taken uh [1:44:53] if this is approved by the uh [1:44:56] and if you if you make a condition that [1:44:58] it's on pilings then that's the point at [1:45:00] which we start [1:45:01] there's no further deliberations between [1:45:04] me and trying to enforce the requirement [1:45:07] that its own pylons [1:45:09] or the county review we start from [1:45:12] the standards you've established [1:45:15] and um well i hope that answers your [1:45:19] question [1:45:20] well chris it was your recommendation in [1:45:23] your report [1:45:24] that you know if the board approves it [1:45:27] that [1:45:27] it should be on pilings right yes that [1:45:30] was [1:45:30] the loan condition that i suggested and [1:45:33] um [1:45:34] because it allows the uh grading to be [1:45:37] done [1:45:38] much much great uh reduced which is the [1:45:41] big issue [1:45:42] we don't want grading in the wetland [1:45:43] buffer particularly when it's [1:45:45] so close to the edge of the wetland [1:45:47] itself so um [1:45:49] and that provides us space to introduce [1:45:53] um parking you know [1:45:57] there's less lot coverage on the ground [1:45:59] there's less construction on the ground [1:46:01] there's no uh basement or a crawl space [1:46:05] and grading up to it that's necessary [1:46:07] so maybe that because of that they can [1:46:09] accommodate the parking we need on the [1:46:11] property which [1:46:12] so helps serve these brother issues [1:46:14] maybe that rather than 20 feet it ought [1:46:16] to be 25 feet to make it easier to pull [1:46:18] in and pull out if you're [1:46:20] a visitor to the area you know so [1:46:22] there's a [1:46:23] i think putting on the pilots gives a [1:46:25] lot of flexibility to the design of the [1:46:28] site [1:46:30] all of the conditions would have to be [1:46:32] in the resolution correct [1:46:36] that's correct madam chair so [1:46:40] these conditions we had are not binding [1:46:43] in any way that they are [1:46:44] recommendations that that's what it [1:46:46] sounds like [1:46:48] no no well if uh the board [1:46:52] adopts the resolution with conditions [1:46:54] that those conditions are binding [1:46:58] uh now as i said before i can if you all uh can't come to a full [1:47:04] agreement tonight [1:47:06] on the conditions the resolution that i [1:47:08] prepare [1:47:09] can't propose conditions for you to look [1:47:12] at and think about [1:47:13] and continue your discussion another day [1:47:16] once you see the [1:47:17] proposed conditions uh if you don't want [1:47:20] conditions [1:47:21] and you want to approve the application [1:47:23] then certainly we can do it that way as [1:47:34] well [1:47:37] madam chair procedurally i think miss [1:47:39] rutkay [1:47:40] had made a motion uh and [1:47:43] i don't recall that that motion was ever [1:47:46] seconded [1:47:47] no i will second the motion uh mr [1:47:50] assessment [1:47:52] thank you [1:47:57] we now have a motion it's been second [1:48:05] i will entertain the vote [1:48:08] mr ferguson yes [1:48:13] sorry it's been a few minutes what is [1:48:15] what was the full text of [1:48:16] what the emotion was about [1:48:21] the motion was essentially uh that the [1:48:24] board [1:48:24] uh directs the test the council to the [1:48:27] board to prepare [1:48:28] a resolution that would approve the two [1:48:31] variances [1:48:32] and recommend to the board conditions [1:48:36] uh based upon the [1:48:39] evidence and testimony presented tonight [1:48:43] and again let me make it clear that [1:48:46] those are only [1:48:47] uh proposed conditioned uh from me [1:48:50] they're not finding upon you as a board [1:48:53] you may look at them and say [1:48:54] as you suggested uh jody no we don't [1:48:57] want [1:48:58] any of the conditions or you may agree [1:49:00] we want condition three but not one two [1:49:02] four or five [1:49:04] but at least it will give you something [1:49:05] to uh think about [1:49:08] as you continue uh deciding how to deal [1:49:10] with this [1:49:12] okay thank you [1:49:16] okay so you're [1:49:19] right i voted [1:49:28] you said approve [1:49:31] yes okay [1:49:54] um [1:49:58] attorney assessment do you need anything [1:50:01] further from us [1:50:02] in terms of preparation of the [1:50:04] resolution [1:50:06] no matter i've been taking notes and i [1:50:08] have uh all the exhibits [1:50:10] so i can uh go from here the only thing [1:50:13] for purposes [1:50:13] of uh the record keeping the record [1:50:16] clean [1:50:17] uh did you madam chair vote or intend to [1:50:20] vote on this [1:50:21] motion no no [1:50:24] okay no [1:50:28] doctors can i ask a point of order um [1:50:31] i know i'm not entitled to it but [1:50:32] there's something that i'd like to raise [1:50:34] as a potential issue [1:50:35] um when you read through the [1:50:39] roll call you mentioned a board of [1:50:42] appeals member [1:50:43] whose face doesn't appear with us [1:50:45] tonight [1:50:46] but i thought maybe she was trying to [1:50:49] enter the discussion [1:50:52] because as soon as you mention her name [1:50:54] her you know box lit up and is lighting [1:50:56] up now could you just ask if that member [1:50:59] can hear you [1:51:00] um and see if she's present in this [1:51:02] discussion for the record [1:51:04] even though we maybe may have a hard [1:51:06] time getting [1:51:07] a vote out of her at least we can know [1:51:09] if she's present [1:51:10] for this discussion [1:51:14] well maybe i will i forgot the member's [1:51:16] name because she's new um [1:51:20] kelly stewart kelly stewart are you on this call [1:51:28] i think that's her number there the one [1:51:30] that's lit up in green here [1:51:33] an unfortunately this is a problem with [1:51:34] this uh platform [1:51:36] we don't know but i just wanted to bring [1:51:39] that up to you for the record i don't [1:51:40] know how you would handle that mr [1:51:42] sussman but [1:51:43] i believe we have a member who can't [1:51:47] express her opinion but she can hear us [1:51:49] but she can't [1:51:50] voice her opinion well i haven't heard [1:51:55] uh she wasn't present at the roll call [1:51:59] and i haven't heard her uh if she is [1:52:01] president now [1:52:02] i haven't heard her attempt to join in [1:52:05] the discussion [1:52:06] so uh at first i'm concerned [1:52:10] she's not present if she is present [1:52:13] and want to be heard i think now is the [1:52:15] opportunity [1:52:16] for her to say something and we can [1:52:18] decide how to deal with it [1:52:20] uh after that [1:52:23] okay just i believe she was present at [1:52:25] the time the roll call i [1:52:27] in the sense that i saw the same thing [1:52:29] light up but [1:52:30] see that as a may i something i just [1:52:32] want to get on the record so [1:52:34] um we can honor her [1:52:38] participation in some way if she [1:52:40] requests [1:52:41] it mr mr jacobian [1:52:44] a roll call was me [1:52:47] yes i'm aware okay um [1:53:02] at this time um [1:53:06] i think we're ready to [1:53:09] begin discussion on case twenty twenty [1:53:24] dash [1:53:38] okay [1:53:50] case 2020-3 application [1:53:54] from francis a and stephanie white [1:53:58] owners and free sample of real property [1:54:00] known [1:54:02] of 8203 elm lane [1:54:05] for a 7.5 variants of section [1:54:10] 290-19a [1:54:12] of the town of chesapeake beach to allow a new [1:54:21] house to encroach 7.5 feet into the [1:54:24] required 15 foot front yard [1:54:27] and a variance to section 290 [1:54:30] 17 e 2 [1:54:34] to allow encouragement into the required [1:54:37] 25-foot non-top [1:54:39] tidal wetland buffer plus [1:54:43] area of disturbance [1:54:53] okay um [1:55:04] can you see the screen my screen [1:55:07] yes okay thank you [1:55:10] um so [1:55:14] i i i'm not going to go through the [1:55:16] entire background like we did last time [1:55:19] this is 8203 elm [1:55:22] lane the house is shown here in this [1:55:26] rectangle the house is outside [1:55:30] of the buffer so it doesn't encroach [1:55:34] as a physical permanent uh entity [1:55:38] into the buffer however there will be [1:55:42] presumably some level of construction [1:55:45] activity [1:55:46] and candidly i don't know the extent of [1:55:48] that [1:55:49] but it will occur within the buffer [1:55:54] if you see this line here says lod [1:55:58] that means a limit of disturbance [1:56:01] and i believe well i'm going to leave it [1:56:03] to the applicant to make the case [1:56:05] but i know there's some overlap and some [1:56:07] of the level of disturbance [1:56:10] or limit of disturbance excuse me enters [1:56:13] into the buffer [1:56:14] um some amount here so there's the house [1:56:18] the setback actually looks like it's 7.2 [1:56:20] feet here [1:56:21] um the this is the driveway [1:56:26] and the parking area um [1:56:30] and um [1:56:34] it seems like all the other off-site [1:56:36] conditions are have been discussed already in [1:56:39] context of 8207. [1:56:42] so i'll just the interest of time end it [1:56:45] there and if there are any questions [1:56:46] feel free to ask me [1:57:04] are you done chris yes yes [1:57:08] oh okay [1:57:13] we're not here from the uh applicant [1:57:19] hello again this is bill watson i'll [1:57:22] discuss with all of my qualifications [1:57:24] and so on and keep the [1:57:28] background information as brief as chris [1:57:31] did with his [1:57:33] um the only thing that i say with regard [1:57:35] to background [1:57:36] is that lot 32r which is the subject of [1:57:39] this case [1:57:41] is slightly larger than the first one [1:57:43] that we did [1:57:45] lot 32r is 11 570 square feet [1:57:50] so we're dealing with a little bit [1:57:51] bigger lot in large part [1:57:54] due to the addition of the avenging [1:57:57] portion of the old friedley avenue [1:58:01] now as chris pointed out [1:58:05] there is a pair of [1:58:09] intersections which occur where the [1:58:11] limit of work or limited disturbance [1:58:13] rather [1:58:14] goes into the buffer one on the [1:58:17] both are on the rear side of the house [1:58:20] one [1:58:20] is up near the existing sewer [1:58:24] easement line and one is directly south [1:58:27] of that [1:58:29] i'm going to turn my screen on again so [1:58:32] bear with me [1:58:38] keeps moving around on me [1:58:43] can you see the drawing [1:58:49] i cannot okay let me try that again [1:58:53] i forgot to hit the share button now can [1:58:56] you see the drawing [1:58:57] yes sir okay [1:59:01] the yellow rectangle [1:59:04] is the proposed house same as before 40 [1:59:07] by 24. [1:59:09] the white line that's curving [1:59:12] and i'm running my cursor over top of it [1:59:14] now [1:59:16] is the limit of the non-title wetlands [1:59:22] the green one uh excuse me the non-title [1:59:24] wetlands buffer [1:59:26] the green line that i'm now running over [1:59:29] is the [1:59:31] division between wetlands [1:59:34] and non-tidal wetland buffer [1:59:38] at the northern part of the property [1:59:41] there is [1:59:41] a impact [1:59:49] and that is 88 square feet [1:59:54] and the southern part of that area [1:59:59] there's a second impact uh oops [2:00:04] just of 33 square feet [2:00:07] so we've got a total of 121 square feet [2:00:10] impact [2:00:13] this is mainly for grading and sediment [2:00:16] control [2:00:18] once the project is complete assuming [2:00:21] that it gets approved to move forward [2:00:24] which i hope it will um [2:00:27] that will all be stabilized with grass [2:00:31] and you'll never know anybody was back [2:00:34] there grading in a year or two [2:00:37] the reason that there is even any impact [2:00:42] is that to put [2:00:46] non-total wetlands as close to that [2:00:49] house as [2:00:50] they are and off of the northeastern [2:00:54] most corner [2:00:56] the non-paddled wets [2:01:03] are only 5 and 45 100 of a float away [2:01:09] hardly room enough for equipment to get [2:01:13] out there and dig foundations [2:01:15] or at least that's what was in my mind [2:01:17] at the time digging a footer [2:01:19] and then doing the block work and then [2:01:21] getting outside of the building and [2:01:23] backfilling [2:01:24] the house now since [2:01:28] my client and barrett's client has [2:01:29] indicated a willingness to [2:01:32] uh consider putting the house on piling [2:01:34] or stilts [2:01:36] some of that will be minimized uh [2:01:38] perhaps even go away [2:01:40] because the amount of grading back there [2:01:43] will be [2:01:43] next to none so i could say [2:01:47] that subject to having an opportunity to [2:01:50] spend a little bit more time [2:01:52] looking at the grading plan and looking [2:01:55] at the design [2:01:56] of the house on stilts it's likely [2:02:00] that we'd be able to eliminate the [2:02:02] impact on the wetland buffer altogether [2:02:06] but out of a [2:02:09] an abundance of caution i would rather [2:02:12] leave that in the application at this [2:02:14] point [2:02:15] only so that it doesn't get lost [2:02:19] because it is rather small at 121 square [2:02:21] feet [2:02:24] the driveway is not in the bumper as mr [2:02:27] truviax said [2:02:28] it is on the lot again a 20 by 20 [2:02:33] that extends out to the existing [2:02:35] education [2:02:37] uh and there's some area to the north of [2:02:40] the proposed driveway [2:02:43] that is labeled a removal of existing [2:02:46] paved parking [2:02:48] areas 251 square feet [2:02:51] um [2:02:54] i from my standpoint i can work with [2:02:57] either condition of [2:02:59] providing a turnaround elsewhere leaving [2:03:02] the pavement there [2:03:04] or something else that the board may [2:03:06] come up with but i would defer to my [2:03:07] client [2:03:08] to make the final decision on that [2:03:11] i believe that [2:03:15] the the pavement removal [2:03:18] is only um one [2:03:21] maybe two parking spaces if you jam them [2:03:23] in there tight [2:03:25] and could easily be replaced if my [2:03:27] client has the opportunity and the [2:03:30] desire [2:03:33] so i think i've covered the the [2:03:37] salient points for this site [2:03:40] which are very minimal amount of impact [2:03:44] to the wetland buffer [2:03:46] being out of an abundance of caution on [2:03:48] being able to give an equipment operator [2:03:50] adequate room to get around on the back [2:03:52] side of the house [2:03:53] to do a traditional foundation if we go [2:03:56] with a [2:03:57] piling different story i'd like to have [2:04:00] the opportunity to take a look at it [2:04:03] and with that i'll pause [2:04:06] put myself on mute and let members ask [2:04:09] me questions [2:04:10] or let tony um pitch in [2:04:14] on any additional points that he'd like [2:04:16] to make on behalf of our mutual client [2:04:28] okay hearing none i'll ask the applicant [2:04:31] to introduce [2:04:34] anyone who's offering testimony [2:04:38] this is anthony o'lex and again um [2:04:42] kind of building upon what bill was [2:04:45] mentioning there [2:04:46] is is part of the disturbance that's [2:04:48] associated within the buffer [2:04:51] is there in order to provide drainage [2:04:53] around the house [2:04:54] which with the last case was a concern [2:04:58] that is that is part of what we have [2:05:00] looked at at this point [2:05:02] um to develop what we believe is the [2:05:05] limits of disturbance and the impacts [2:05:07] into this [2:05:08] is in addition to providing room to be [2:05:10] able to work around the house itself [2:05:13] is creating a swale uh that directs [2:05:17] runoff um essentially from the northwest [2:05:20] corner [2:05:21] of this house and the other house as [2:05:24] well that's about [2:05:24] ranges from about a foot to two foot in [2:05:27] depth [2:05:28] compared to the finished floor elevation [2:05:30] of the house and directs the water [2:05:32] around each side [2:05:34] um you know so i guess that was a little [2:05:36] bit of what [2:05:37] you know i learned with the last case [2:05:38] and probably a point that i should have [2:05:41] made is [2:05:42] that that is part of what we have looked [2:05:44] at with this [2:05:45] um and things that we have taken into [2:05:48] consideration [2:05:49] uh and absolutely as we move forward [2:05:52] through the building permit process and grading [2:05:55] permit processes that we will also be [2:05:57] complying with [2:05:59] all of those requirements as they relate [2:06:01] to storm water management [2:06:03] sediment erosion control and any other [2:06:06] code requirement [2:06:08] um you know the [2:06:11] mr white who spoke uh that will be [2:06:13] building both of these houses and in [2:06:16] this case is the owner of this property [2:06:18] uh talked about is you know [2:06:21] i think we're absolutely willing to look [2:06:23] at the opportunity [2:06:25] uh to build the house on piles um it's [2:06:28] just you know something that just kind [2:06:29] of came up [2:06:30] today i think uh whether it's piles or [2:06:33] whether it's anything we would [2:06:34] absolutely be looking to make sure that [2:06:35] we're raising the house high enough [2:06:38] uh taking into consideration future uh [2:06:41] potential for flooding in [2:06:42] the somewhat near future uh [2:06:46] in all of those things it's there is a [2:06:49] little bit of [2:06:51] engineering judgment and calls and [2:06:52] things like that that we do need to make [2:06:54] as we work through that [2:06:56] um and try to figure out what the best [2:06:59] solution is [2:07:00] uh but i absolutely know that in any [2:07:02] case we'll be complying with any codes [2:07:05] and requirements and ordinances that we would need to in this case [2:07:11] and really what we've done and kind of [2:07:13] what bill alluded to [2:07:15] in this case is that we're taking a [2:07:17] little bit of a conservative approach to [2:07:18] make sure that there's enough room [2:07:20] uh to get the water around the house [2:07:23] itself [2:07:23] and provide you know room uh reasonable [2:07:26] room [2:07:27] for constructability uh but with the [2:07:30] front [2:07:30] setback reduction that actually you know [2:07:33] that was [2:07:33] recommended by mr jacobi app was that a [2:07:37] got us out of the buffer with the [2:07:39] structure all together [2:07:40] so the impacts that we're talking about [2:07:42] here in this case [2:07:44] with the uh front yard setback are all [2:07:47] temporary impacts to that buffer um [2:07:51] you know and that's you know i think was [2:07:54] it was a great recommendation especially for this [2:07:59] lot where it was [2:07:59] able to get us out of that so um [2:08:02] yeah i just wanted to kind of put that [2:08:04] out there that there are some of these [2:08:05] you know some of these details are the [2:08:07] things that we [2:08:08] have looked at so far um to to be able [2:08:11] to define [2:08:12] these variants requests and we'll [2:08:14] continue to look at them as we go [2:08:16] through the next steps [2:08:17] of permitting [2:08:21] okay uh madam chair may i uh [2:08:24] say something for a moment yes uh [2:08:28] given the way this uh hearing has [2:08:30] progressed [2:08:31] uh there were references uh during the [2:08:34] hearing on 2020 [2:08:36] to this particular application and there [2:08:39] was some [2:08:40] uh testimony during the hearing on that [2:08:43] uh [2:08:44] 2020-2 that would be relevant to this [2:08:47] particular application [2:08:48] i'd like to suggest that the board uh [2:08:52] accept and incorporate by reference you [2:08:54] know [2:08:55] all of the evidence and test testimony [2:08:58] uh presented in the hearing on 2020 [2:09:00] death 2 [2:09:01] into the record of this particular case [2:09:03] that way [2:09:04] if you need to you'll be able to rely [2:09:06] upon anything from [2:09:08] that hearing [2:09:16] okay comment from the board on that [2:09:29] hearing no objection [2:09:33] fine yes [2:09:38] so so directed [2:09:50] okay any more for the applicant before [2:09:53] we go to the opposition [2:09:58] sharon did anyone indicate interest [2:10:01] in uh given testimony [2:10:04] for all gangster 2020-3 [2:10:08] i do um [2:10:16] uh the only comments that i received was [2:10:19] from gary cole smith and i believe that [2:10:21] he was [2:10:22] addressing both of the lots but gary can [2:10:26] speak for himself if he's still [2:10:28] on i'm chairman i am still on [2:10:33] do you want to speak yes ma'am [2:10:37] please do okay [2:10:40] uh again i want to reiterate that i [2:10:43] think that [2:10:44] with the use of raising the house [2:10:48] uh and the parking underneath [2:10:51] there is no need for the reduction in [2:10:54] setback [2:10:55] and i think that all the tile elevation [2:10:59] type installation lessens the impact [2:11:04] after construction of those houses [2:11:09] and i would not object to that but the [2:11:12] two the things i we have to regurgitate [2:11:15] here are [2:11:16] there still has to be a t turn around [2:11:17] there's no it can't have people come down we have the trash [2:11:21] trucks come down [2:11:22] once a week cycling truck comes out once [2:11:26] a week [2:11:26] a mailman comes out once a day uh [2:11:30] ups with deliveries fedex [2:11:33] amazon everybody comes down the street [2:11:35] to service the people on the street [2:11:38] and they need a place to turn around a [2:11:40] turnaround needs to be [2:11:41] entertained parking for the [2:11:46] grandfathered lot needs to be uh [2:11:49] addressed i mean these people cannot [2:11:51] help that that lot was [2:11:53] approved the law was approved by the [2:11:56] old subdivision plan and based on a [2:11:59] 50-foot wide street [2:12:01] so that has to be addressed and the [2:12:04] approval [2:12:05] by the town of chesapeake beach is [2:12:06] required to do [2:12:08] anything in the right of way and i don't [2:12:10] know how that can follow [2:12:12] uh an approval by the of ovarian [2:12:16] when you have to you should know all the [2:12:19] requirement that all the requirements [2:12:21] were met [2:12:23] and it approved this the town did not [2:12:25] approve the use utilization of [2:12:27] that right away for any purposes that [2:12:29] this [2:12:30] variance addresses then [2:12:33] your approval was uh [2:12:38] you know that doesn't exist i i still i [2:12:41] think that we are good [2:12:42] doing things out of order i think that [2:12:44] first that you needed [2:12:45] that this this plan for this needs to [2:12:48] address [2:12:48] the type of foundations you have the the [2:12:51] stormwater [2:12:52] management of the street and the [2:12:54] approval by the town just a big beach of [2:12:56] you [2:12:56] any of the utilization of the public [2:12:58] right-of-way [2:12:59] and then and only then can you make your judgment that's my personal opinion [2:13:05] but i believe that's [2:13:06] the the town ordinances there is a town [2:13:09] ordinance that says [2:13:10] you must require acquire the mayor's [2:13:13] approval may earn tax house approval but [2:13:15] do anything in the right of way the town [2:13:17] chesapeake [2:13:17] beaches street so i i do believe [2:13:22] that that is definitely going to have to [2:13:24] be done prior to any approvals you make [2:13:29] now a quick i'll stop beating a dead [2:13:31] horse at that point and [2:13:32] the uh the fact that the this this plan [2:13:35] now has a [2:13:36] construction entrance off of a section [2:13:38] of elm lane that is not a two-way street [2:13:41] is too narrow it's only 13 feet wide [2:13:44] at that location and it enters is right [2:13:47] at my the entrance to my [2:13:49] driveway and uh i can i can see right now that there [2:13:55] will be issues with me getting in and [2:13:56] out [2:13:57] so it will impact the neighborhood uh so [2:14:01] i guess that [2:14:03] [Music] [2:14:04] if you if you could address those issues [2:14:08] uh i wanna make so very clear i'm not [2:14:10] against building on these lots [2:14:12] i i am very much uh in favor of it [2:14:16] i just know that they need to meet those [2:14:18] requirements and and [2:14:19] i think those requirements are [2:14:21] legitimate so uh thank you for your time [2:14:23] man sheriff [2:14:31] mr jacubia did you have any other [2:14:34] comments to me [2:14:41] uh no i have no other comments [2:14:46] okay [2:14:49] and we have no more speakers so at this [2:14:54] time i will close [2:14:56] the public i [2:14:59] have one question if i could [2:15:03] sure [2:15:07] it's based on well the question i have [2:15:10] simply [2:15:11] is let's say the houses aren't built [2:15:15] where is everybody turning around now [2:15:19] for one and two they're not turning [2:15:21] around on the space that's there now [2:15:23] because they're full of cars so i'm [2:15:24] trying to figure out where everybody's [2:15:25] turning around [2:15:27] i understand fedex and ups and the [2:15:30] mailman [2:15:31] and trash man everybody's coming down [2:15:32] the street but where's everybody turn [2:15:33] around now [2:15:35] that's what i don't understand and i [2:15:36] don't have a problem [2:15:42] i'm listening go ahead i'm chairman yeah [2:15:46] yes uh right now a lot of people come [2:15:49] down my driveway and turn around at the [2:15:50] bed to my house [2:15:51] which is not very convenient and it's [2:15:54] not very well [2:15:55] the the vehicles that are parked up [2:15:57] there as you said there are three [2:15:59] vehicles that belong to [2:16:01] his grandfather-in-law the other [2:16:04] vehicles [2:16:04] you probably see there are people who [2:16:06] live with the other in two of the other [2:16:08] homes [2:16:09] and occasionally they don't park there [2:16:11] the requirements for a t turnaround [2:16:13] are signage by the town chesapeake beach [2:16:16] that require [2:16:17] no parking that is to be maintained as a [2:16:20] turnaround [2:16:21] sometimes vehicles do have a difficult [2:16:23] time turning around there [2:16:24] in in in that is a a [2:16:28] issue for the town but the fact that you [2:16:31] take away [2:16:33] any possibility of [2:16:36] a vehicle being able to turn around [2:16:37] there and [2:16:39] have it in fact the driveway to a new [2:16:42] home [2:16:43] where those people may want to park out [2:16:45] in [2:16:46] front of the their homes uh it just [2:16:49] complicates the problem so yes that [2:16:52] right now there is a problem [2:16:53] and and i sent an email out to town [2:16:55] chesapeake beach telling them that what i want to see is i would like to see that the teeth turn around [2:17:01] remain [2:17:02] and be marked as it's supposed to be [2:17:04] with no parking signs [2:17:11] i completely understand that but the [2:17:12] thing is every time i come down there [2:17:14] there's four to five cards in there but [2:17:16] there is no marking there is no signs [2:17:19] and that's what i don't understand i i [2:17:21] just don't [2:17:23] know i'm trying to wrap my head around [2:17:24] it that's all i mean [2:17:26] madam chair can i try to address this i [2:17:28] think [2:17:30] so yeah um i think what we're talking [2:17:34] about is a lot of work that's going to [2:17:35] occur [2:17:36] with inside of the right-of-way the [2:17:38] public right-of-way that is there [2:17:40] that is going to be part of the [2:17:41] permitting process that we're going to [2:17:43] have to work through after this step [2:17:45] um if i remember right from the drawings [2:17:49] uh the wetland buffer does not really [2:17:51] encroach into any part of the right of [2:17:53] way [2:17:54] the buffer itself is on the lots of [2:17:57] themselves [2:17:58] um so if they're you know i think we're [2:18:00] absolutely willing to try to figure out [2:18:02] a good solution with mr jacubiak and the [2:18:04] town engineer [2:18:06] as we move forward um to try to address [2:18:08] any concerns that the town may [2:18:10] have about turn around or parking that [2:18:12] is lost [2:18:13] um in a reasonable manner but as far as [2:18:16] this request for variances or these [2:18:20] requests for variances go it really goes [2:18:22] to the siding of the house [2:18:24] on the lots themselves which [2:18:27] i believe has been cited in a way um [2:18:31] to minimize any impact to those buffers [2:18:34] whatsoever so [2:18:35] we'll um you know absolutely continue to [2:18:38] work through the process in the next [2:18:40] steps [2:18:40] um i know it's very common of any board [2:18:43] approval or planning commission approval [2:18:45] that you're you're required to get any [2:18:47] necessary permits moving forward and [2:18:49] comply with code [2:18:51] with the next steps that you are have to [2:18:54] take [2:18:54] with part of that uh i just as it stands [2:18:58] right now we've [2:18:59] sighted the house and we've taken [2:19:01] measures on the lots themselves [2:19:04] to try to minimize those impacts and [2:19:06] that's what these variants requests are [2:19:08] based on [2:19:18] does anyone else want to speak before we [2:19:22] stop the public comment and the board [2:19:26] begins discussion madam chair dave dave [2:19:29] ferguson here [2:19:30] um i you know listening to you know mr [2:19:33] coldsmith's [2:19:34] argument that the board shouldn't [2:19:37] consider the variance [2:19:38] until these uh issues with the [2:19:42] turnaround and the parking [2:19:44] are resolved uh [2:19:49] you know i this is beyond my area of [2:19:51] expertise but it seems to me [2:19:53] and and maybe between mr jacobiak and mr [2:19:56] sussman [2:19:57] we can clarify that seems to me that the [2:20:00] application for the variants needs to [2:20:03] precede [2:20:05] the application for building permits and [2:20:08] uh you know the the things that [2:20:11] then the town has to get involved with [2:20:14] as far as the right of way [2:20:16] and the turnaround and signage and so [2:20:20] forth [2:20:22] it seems to me that without approval of [2:20:24] the variance [2:20:26] the applicants cannot go forward with [2:20:29] building plans [2:20:30] uh and a request for a building permit [2:20:35] am i correct in that uh [2:20:38] from the town planner's response first [2:20:41] uh yes and this is a [2:20:45] the subject before you as a variance two [2:20:47] variances [2:20:48] all related to the building placement on [2:20:50] the lot i suppose that sometimes [2:20:52] other issues could come into the um [2:20:55] the discussion but here the location of [2:20:58] the parking [2:20:59] lot and whether the tap parking pad and [2:21:00] whether the town will require [2:21:03] uh a 16 foot uh throat for the driveway [2:21:06] or [2:21:06] 18 or 25 or even may even require that [2:21:11] the parking pad extend further into the [2:21:14] site but not into the buffer but further [2:21:16] in order to give more space for so [2:21:19] there's no one parking [2:21:20] in an area where someone could come in [2:21:22] and use it as a turnaround [2:21:23] those are issues we're going to work out [2:21:25] i mean i can assure you we're going to [2:21:26] work it out [2:21:27] but that's not subject to the variance [2:21:28] request before you in my view [2:21:32] and yes any work in the town right of [2:21:35] way [2:21:35] does require town approval um and if [2:21:39] it's a changing street or adding street [2:21:41] or improving the street [2:21:42] adding new parking on the street [2:21:44] widening the street [2:21:46] uh and if someone wants to do it as an [2:21:48] individual private owner yes they need [2:21:49] they require town approval [2:21:51] and and often that approval requires [2:21:54] mayor and council approval but but [2:21:57] building a driveway [2:21:59] off of a public street does not require [2:22:01] mayor and council approval [2:22:03] um it's [2:22:08] if i may uh just you know add to what mr [2:22:11] tsukubiak said [2:22:12] first i agree with everything he said [2:22:14] and the second point i would make [2:22:16] is that uh if the applicant [2:22:20] is unable to procure all the necessary [2:22:24] uh town approvals and perhaps county [2:22:26] approvals to the extent county approvals [2:22:28] are required [2:22:29] to build the houses uh that have been [2:22:32] authorized [2:22:33] by the variants so they won't be able to [2:22:35] build them this is [2:22:36] precisely it is the first step in a [2:22:39] multi-multi-layer process [2:22:43] i'm sure may i [2:22:48] yes uh [2:22:53] actually the use you have [2:22:56] shown on your drawings that you're going [2:22:58] to remove [2:22:59] part of the street of chesapeake beach [2:23:02] that chesapeake beach [2:23:03] owns and installed i was present when it [2:23:06] was paid [2:23:07] the last time i wasn't president was [2:23:09] paid the first time it was paid when i [2:23:10] first moved here [2:23:12] 20 years ago so the town chesapeake [2:23:14] beach owns that right away [2:23:16] and with without their approval the information that you have on your [2:23:21] various requests [2:23:22] is incorrect so that is why i'm saying [2:23:26] that what you are that there are certain [2:23:29] aspects of this various requests that [2:23:31] need to be addressed [2:23:33] prior to the variance being approved or [2:23:35] contingent upon the various beings [2:23:39] thank you mr kohl's mr cole smith uh [2:23:42] dave ferguson here uh the [2:23:47] only variances we are approving is the [2:23:50] seven and a half foot [2:23:51] setback and the uh encroachment into the [2:23:55] wetlands buffer [2:23:56] those are the only two variances that [2:23:58] this board is addressing [2:24:00] all of those other issues i believe will [2:24:02] be addressed [2:24:04] in the building permit process [2:24:07] you know later on hey i'm [2:24:11] madam chairman uh [2:24:15] the information that you have in front [2:24:17] of you is the information necessary for you to [2:24:21] make the determination for the variance [2:24:24] part of the variance that they're [2:24:25] requesting is the seven and a half foot [2:24:27] difference in the setback if i have if [2:24:30] we have a t [2:24:31] turn around in front of that house and [2:24:33] you it is only seven and a half feet [2:24:35] from the t turn around and i have a [2:24:37] garbage truck [2:24:38] and you all have seat garbage trucks [2:24:40] from the back wheel base [2:24:42] to the end of the dump of that garbage [2:24:44] truck is probably seven and a half feet [2:24:46] so if someone were in a garbage truck [2:24:48] and use the t turnaround and it was at [2:24:50] that [2:24:51] property's entrance or properties [2:24:54] uh property line and we utilize the [2:24:58] entire width of the right-of-way [2:25:00] then that garbage truck would probably [2:25:01] strike the structure [2:25:03] so i'm telling you it is very important [2:25:05] to consider [2:25:06] what we are doing in that street prior [2:25:09] to approving a seven and a half foot setback [2:25:13] allowance [2:25:14] thank you [2:25:22] before i go to the board for discussion [2:25:26] chris uh mr jacobia [2:25:30] yes can you cite again what will happen [2:25:36] should uh the variances [2:25:40] be approved conditionally [2:25:45] the um the applicant will [2:25:48] obtain your approval your resolution and [2:25:52] those conditions will establish [2:25:54] uh what they actually submit to you or [2:25:57] to me [2:25:58] as the zoning administrator um [2:26:03] a a detailed sally plan like [2:26:06] what you see here perhaps even more [2:26:08] detailed will be submitted to me [2:26:10] and to the town engineer and we will [2:26:13] review it [2:26:14] and it will also be reviewed at the same [2:26:19] time by [2:26:20] calvert county and [2:26:23] there are other issues that we even [2:26:25] haven't even mentioned there's critical [2:26:27] area mitigation requirements [2:26:31] for instance this property is probably [2:26:33] going to have to plant a lot of trees [2:26:35] uh and if they can't plant them on the [2:26:37] site they may have to pay a fee in lieu [2:26:39] of [2:26:40] planting the trees we may could [2:26:42] potentially require that part of the [2:26:44] driveway be [2:26:46] made of pervious pavers conceivably you [2:26:49] know there's a whole series of standards that [2:26:52] have to be applied and met [2:26:53] and i would imagine a thorough review [2:26:56] process just like we would give [2:26:58] uh any applicant even more so because [2:27:01] it's in the critical area [2:27:03] so the questions about what the driveway [2:27:05] is where it's located [2:27:06] uh what the maneuverability in this [2:27:09] street [2:27:10] is and what it ought to be for the type [2:27:12] of street it is [2:27:13] all those issues will [2:27:16] be reflected and i hear mr goldski [2:27:19] smith's concerns and i [2:27:21] share some of those concerns too but [2:27:24] those are ultimately [2:27:26] site plan issues and town issues about [2:27:28] how it wants to use its own [2:27:31] right-of-way but they will be [2:27:35] addressed yes [2:27:42] okay [2:27:47] at this time i think [2:27:50] the board needs to move into [2:27:54] its deliberation [2:27:57] and i'd like to start with uh [2:28:00] with you mr ferguson [2:28:05] uh yes madam chair um [2:28:09] i would uh [2:28:12] i i'm at the point right now where [2:28:16] these two particular cases [2:28:19] uh o2 and o3 are so similar [2:28:22] that i would like to make a motion [2:28:28] uh well i won't make a motion until [2:28:29] after we've heard from all the board [2:28:31] members but i believe [2:28:32] uh you know that this one looks [2:28:36] uh very much like the previous case and [2:28:38] that we should uh [2:28:40] you know ask mr sussman to uh to [2:28:44] draft a memo uh with [2:28:47] uh approval and conditions [2:28:54] uk [2:29:00] you're muted [2:29:04] so sorry uh i agree with mr ferguson these cases are [2:29:14] extremely similar i think all of us have [2:29:19] well certainly mr cole smith has brought [2:29:22] up some excellent points and if they're [2:29:25] going to be addressed [2:29:30] then i think we ought to have that [2:29:32] memorandum from [2:29:33] mr sussman and take a look at the [2:29:36] conditions and see what uh makes sense [2:29:38] or does it make sense [2:29:46] mr holm star i agree with both mr [2:29:49] ferguson and miss brooking [2:30:02] okay [2:30:08] uh david you're muted excuse me [2:30:13] thank you i uh i'm unmuted now [2:30:17] i was just going to say i will make a [2:30:19] motion [2:30:20] that uh the board [2:30:27] asked mr sussman to uh draft a memo [2:30:32] reflecting approval of the two variances [2:30:35] in this case [2:30:36] and proposing uh some conditions [2:30:40] including the one recommended by mr [2:30:43] jacobiak [2:30:44] that the building be on pilings [2:30:48] uh and others that uh you know [2:30:52] we may wish to consider based upon the [2:30:54] testimony we've heard [2:30:56] and provide those to the board for [2:30:58] consideration [2:31:02] i second the motion made and accepted [2:31:26] approved [2:31:31] and uh mr sussman [2:31:35] you will prepare the resolution [2:31:38] yes madam chair i'll prepare both [2:31:40] resolutions for the board [2:31:45] okay [2:31:52] with that [2:32:08] well now [2:32:17] i will now take a look at the resolution [2:32:20] i assume you have a copy of it [2:32:29] madam chairman i think i can go ahead [2:32:31] and sign off now i just wanted to thank [2:32:32] everybody for their time tonight [2:32:34] um i know there was a lot there [2:32:38] challenging lots so i appreciate [2:32:39] everybody's time and consideration [2:32:41] thank you thank you yeah thanks very [2:32:45] much [2:32:46] have a good night good night [2:33:00] uh yes thank you very much [2:33:03] thank you thank you too [2:33:13] okay we'll now move on to review of the [2:33:17] written [2:33:18] decision [2:33:21] uh for the board of appeals case [2:33:24] 2020-1 [2:33:28] board of education of calvary county um [2:33:31] beach elementary school replacement [2:33:34] project [2:33:35] at seventy nine hundred o bayside road [2:33:39] chesapeake beach maryland [2:33:49] has um all of the board members [2:33:54] received and reviewed the resolution [2:33:58] yes yes [2:34:17] sharon do we have required signatures [2:34:23] um what i'll do is i'll send the [2:34:25] resolution out [2:34:26] uh via docusign for everybody to sign it [2:34:32] if you approve it of course [2:34:38] any comments from board members [2:34:44] i only have one administ administrative [2:34:47] observation [2:34:48] and it may be an incompatibility of the [2:34:52] version of [2:34:52] microsoft word i've got but every page [2:34:55] number is [2:34:56] two we have ten pages two ten second [2:34:59] pages [2:35:00] um uh [2:35:03] mr ferguson the one that i was sent out [2:35:07] has every page separately numbered there [2:35:09] were ten pages [2:35:10] and at the bottom you know so that's why i said it may have been an [2:35:14] incompatibility with my version of word [2:35:16] i've got an older version [2:35:19] so mine has 10 pages okay [2:35:27] i'm assuming everyone else's does [2:35:30] jan yes ma'am mine does [2:35:34] yeah okay that's why i said it was [2:35:37] administrative [2:35:39] um i had one [2:35:42] i thought the the uh [2:35:46] everything was written up really well [2:35:49] i thought this was very well documented [2:35:51] and uh i didn't have any issues [2:35:56] with uh anything except uh [2:35:59] on the next to last page [2:36:03] the [2:36:06] near the bottom of the next to last page [2:36:09] uh [2:36:10] paragraph c says this variance is [2:36:12] subject to the time limitation [2:36:14] set forth in 290-32h of the town code [2:36:18] and then the special exception is [2:36:20] subject to time limits [2:36:22] sent forth in 290-12 i three [2:36:25] of the town code so i recall [2:36:28] a case not too long ago where we [2:36:32] as the board had to go in and reconsider [2:36:35] or grant an extension [2:36:36] because somebody didn't get their permit [2:36:40] didn't start building within the one [2:36:42] year time limit and [2:36:45] having 41 years experience is a [2:36:48] government [2:36:48] plan planning programming and budgeter i [2:36:51] know [2:36:52] this is a government project to build [2:36:54] this school [2:36:55] and our town code i looked it up [2:36:59] and and both time limits are [2:37:03] uh the the approvals [2:37:06] are valid for a period of one year uh [2:37:10] unless a zoning permit is obtained and [2:37:13] erection of the alter or alteration uh [2:37:18] is underway uh [2:37:22] and then there's also on the special [2:37:24] exception it's [2:37:26] one year and there can be two successive [2:37:29] extensions [2:37:30] of periods not longer than six months [2:37:32] each [2:37:33] so i'm just i looked back through all of [2:37:36] the documentation on the school project [2:37:39] and i didn't find a date [2:37:42] a funding year or a start date or when [2:37:46] they [2:37:46] intend to start construction so i'm [2:37:49] you know wondering if we're building [2:37:51] ourselves a box here [2:37:53] uh you know because this [2:37:57] uh variance is limited to [2:38:01] one year and is the school construction [2:38:03] going to be [2:38:04] sufficiently underway [2:38:09] and i don't know that we have any option [2:38:13] to grant them a longer period of time [2:38:15] because it's in the town code [2:38:17] so that i just thought i should express [2:38:19] that concern [2:38:22] and mr ferguson i think that you're [2:38:23] absolutely right uh [2:38:25] even if it was not in the resolution [2:38:27] it's in the town code and they would [2:38:29] still be bound by those time limits [2:38:31] uh and then if they're approaching the [2:38:34] end of them [2:38:35] and they're still uh not underway yet [2:38:38] they can come back to the board for an [2:38:39] extension [2:38:41] yeah so don't buy paperwork away we may [2:38:44] see this again [2:38:47] exactly well um [2:38:51] the clock will essentially start [2:38:54] once they come they have a year to come [2:38:56] in and obtain a [2:38:58] zoning permit right then that extends [2:39:00] things [2:39:01] again and i expect them in front of the [2:39:04] planning commission [2:39:05] imminently maybe even in september quite [2:39:09] conceivably [2:39:10] if not then certainly october um [2:39:13] and i have a sense that they're moving [2:39:14] pretty pretty quickly but i had the [2:39:16] exact same issue [2:39:17] concerned i thought about bringing it to [2:39:19] your attention then i saw [2:39:21] the the code doesn't allow us for you to [2:39:24] put a condition [2:39:25] in the approval to extend that and i [2:39:27] thought wow that would be a nice thing [2:39:28] to have the ability for the board of [2:39:30] appeals to [2:39:31] extend an approval as you grant it i [2:39:35] know some jurisdictions do that [2:39:36] yeah let us talk to the town council [2:39:38] about that right [2:39:40] maybe it's yeah worthwhile doing okay [2:39:43] that was my only concern i i know [2:39:47] you know that the not only do you have [2:39:50] the timeline for the permitting [2:39:52] and you know process and zoning but then [2:39:55] you [2:39:55] then you've got the whole government [2:39:57] budgeting process and nothing happens [2:39:59] faster [2:40:05] well that concludes [2:40:09] our hearings for today well madam chair [2:40:12] you need a vote on the resolution [2:40:18] i thought we did that maybe i'm not it [2:40:20] is time [2:40:25] everyone received their copy reviewed it [2:40:30] let me take the vote [2:40:36] mr ferguson hi [2:40:42] mr k hi [2:40:47] mr hoonstown hi [2:40:57] the resolution is accepted and [2:41:04] one side [2:41:08] will be placed in the record [2:41:15] and that concludes [2:41:19] our hearing unless there's something [2:41:22] else [2:41:23] you like to address anything else [2:41:35] thank you thank you thank you good night everybody [2:41:49] you