[0:09] You guys got to come down. [0:15] » No, I know. [0:32] 602 and uh public hearing no start. [0:37] First we'll do the pledge of allegiance [0:44] to the flag of the United States of [0:46] America and to the republic for which it [0:49] stands. One nation under God, [0:53] indivisible, with liberty and justice [0:55] for all. [1:01] » First, we'll have uh citizens comments. [1:04] Any citizen comments? [1:08] Are we [1:09] talking about what you just did on your [1:11] bucket or [1:13] » Talk about anything? Now's the time. [1:17] Is is this a selective meeting or a town [1:20] meeting? [1:20] » This is a public hearing. [1:25] » David Lamach school [1:30] for the chip seal on it come out pretty [1:33] nice. [1:35] I just had a a couple of questions. [1:39] First one is [1:42] roads selected [1:45] to be taken care of. [1:47] When you when you're looking at your [1:49] budget [1:51] or how much [1:54] you can do, [1:57] who makes the determination on what [1:59] needs to be done? [2:01] The determination comes from [2:05] I public works. what roads are more [2:09] grave than others with this with the ch [2:11] some some of the roads can't be chips [2:13] some of them are just they need to be [2:15] replaced so they they figure out what [2:18] roads could you like they start with [2:21] then they'll go to um brown or wherever [2:26] » Well can I jump in here we also have the [2:29] contract with Beta which did a scan of [2:32] all 37.2 2 miles of town road and they [2:36] gave us recommendations for maintenance [2:39] for each road and a schedule and that's [2:42] what public works is using to make their [2:44] decisions. So it's not just we're [2:46] randomly picking roads. It's we have [2:48] data that was collected because data [2:50] drove around with trucks and they [2:52] scanned all the roads to get road [2:53] conditions and then they gave [2:55] recommendations on whether it was a chip [2:57] seal, whether it was a full replacement, [2:59] all that sort of stuff. There was a host [3:01] of things that they gave us. Okay. [3:04] So, if we remember back last year at the [3:09] town meeting that [3:12] got cops involved [3:15] and [3:17] over a lot of voicing over Williams [3:20] throat over there off of Brown [3:24] and Kentucky was supposed to be chip [3:27] sealed last year, [3:30] but apparently they went over and did a [3:33] pave job [3:35] on Williams. [3:37] » So the reason why Shitucket wasn't done [3:39] last year wasn't a change in priorities. [3:42] It was due to weather. So they ran out [3:44] of time due to weather on what they [3:47] » Time to do Williams. [3:51] They were assigned to Williams [3:55] » And I don't when they were crack sealing [3:59] and it got 90 degrees, [4:02] you undercoated everybody's car. [4:05] The stuff was running down the road. [4:08] » Yeah, I had a few people calling about [4:10] that. So, we uh we had the chip ceiling [4:13] company here tonight. I think [4:17] they're going to show up. They were [4:18] supposed to be here. So, [4:21] So my second question is [4:25] when are you going to finish the reps of [4:28] from school that horse? [4:35] » I don't know if that was on the plan. Do [4:37] you Ryan? [4:38] » Really? [4:39] It's on the plan. Um, [4:42] Kentucky and [4:47] not Valley. [4:49] Ron, what's your road? Where is it? [4:52] » James. [4:53] » James Road. [4:53] » He's on James Road. [4:55] » James Road. So, they were doing [4:57] Satucket, James Road, and I think [5:00] » Where the chip seal. [5:02] » Yeah. [5:02] » But Shitucket from Wley School at a [5:07] farest [5:09] » The back end. You can't just chip seal [5:11] that. [5:13] » Is that Is that [5:15] okay? I know what you're saying now. [5:17] » You know where I mean? [5:18] » Yeah. Don't to the dead end. [5:20] » Yeah. [5:21] » A dead end back there. Yeah. [5:22] » Dirty ch [5:25] » Um I mean I'll have to find out about [5:27] that. [5:29] » Have you driven it? [5:30] » I driven. It's not great. I'm going to [5:33] agree. Not good. So, [5:37] » I'm just curious where it fits in. [5:40] » Right. And I I'll I'll get to the bottom [5:43] of that and ask him why. But [5:48] » The other one he got done was that was [5:49] just as bad. [5:54] » Right. [5:55] Quickly, [5:56] » Right? [6:01] I will make that a note and I'll talk [6:06] to the chip steelers if they're here [6:07] tonight about it and then if not then [6:09] I'll talk to [6:10] » That's complete rebuild. [6:12] » Yeah. [6:16] » Oh yeah. [6:19] » A rebuild's a little tougher than just [6:21] chips. [6:22] » But so wasn't the other one off of [6:24] Brown, [6:25] » Right? [6:25] » That was rebuilt off. [6:26] » It wasn't rebuilt. It was just hard. [6:28] » Yeah. Well, okay. It was just part over, [6:33] but it was just as bad a shape as the [6:36] rest is. [6:38] » That's the thing. [6:39] » Well, it's a lot better than it was. [6:46] » We will figure that one out. We'll we'll [6:48] try to figure that one out. And that's [6:50] just like any other road in Ventown. We [6:52] got to look at it, process, and what we [6:55] can afford. Okay. At one one time, one [6:58] of the [7:00] past selectman [7:02] I thought to him about it [7:05] said, "Well, there's only one house down [7:07] there." [7:09] That was the wrong answer. [7:11] » Did you hear me say that? [7:12] » No. [7:15] » No. [7:16] Every road's a road here. Whether it's [7:18] one house on the road, whether it's 30, [7:20] » Right? [7:21] » We I look at it the same. though and and [7:24] you drive around Vent Town and some of [7:26] these roads are not good at all. So, I [7:29] mean it's tough to like we can say that [7:32] and we can put Gallop on there and we [7:34] can put Kenny on there and we can put [7:36] you know a ton of them on there too. [7:38] » Oh yeah. [7:38] » So [7:40] there's a lot of work involved if we had [7:43] the money be great. I wish I could call [7:46] and say, "Well, we're going to do this [7:47] one this year. We'll do that one next [7:49] year or two those two next year." But, [7:53] you know, [7:54] » Well, you can put in your strong [7:55] reputation, [7:56] » Right? [8:04] Anybody else? [8:11] » Hey, John. [8:13] » Yeah. Um, not messing with the TV [8:16] because it's still working. Everybody [8:17] can see fine. But John here, [8:19] » Uh, new business [8:22] first part is the water study findings. [8:24] John, you there? [8:27] » John? [8:28] » I am here. Can you hear me? [8:32] » Can you guys hear me? [8:36] » He shouldn't come through the TV. He [8:37] should be coming here. [8:50] Can you hear us? [8:52] » I can. Yes. And I can see Brian and Sue. [8:57] » Okay. [8:59] Okay. You're on the laptop. Give us a [9:01] second, John. We'll get you. [9:02] » Okay. Yeah. Take your time. [9:09] Is the plug coming out from the garbage [9:11] can on the wall over there? [9:13] » Oh, yeah. I can see. [9:17] » Well, [9:21] thanks, Tracy. [9:28] [laughter] [9:29] » All right. [9:35] » Can you guys hear me now? [9:37] » Perfect. Yes. [9:40] Okay. Um, so for the record, I'm John [9:43] Gusowski. I'm the town's uh consulting [9:45] planning director. Um, I've been uh [9:49] project managing the community water [9:52] system study. Um, just have a brief [9:56] statement about the the current status. [9:59] Um, the town of Volunttown community [10:02] water system study was initiated to [10:04] evaluate whether a public water system [10:07] could address recurring well reliability [10:10] concerns, support future development, [10:12] and enhance long-term water availability [10:15] in two key areas of town. The study was [10:18] prompted uh in part by drought [10:21] conditions several over the last several [10:23] years and concerns regarding uh private [10:26] well capacity and particularly within [10:28] the village center area and the beach [10:30] pond area. Um we pursued and received a [10:35] community infrastructure fund grant from [10:37] the state of Connecticut department of [10:38] economic and community development. This [10:40] was a $250,000 [10:43] um planning and engineering study that [10:45] was fully funded by the state. no [10:47] municipal finances were required or [10:50] involved. Um, as part of this effort, [10:53] the town conducted hydrogeeologic [10:55] investigations. Uh, we installed and [10:58] monitor observation wells and we [10:59] performed water quality testing at [11:01] several potential water source [11:03] locations. Um, in the village center, [11:06] which study was is basically getting [11:08] wrapped up now. Um, the observation [11:10] wells showed uh promising groundwater [11:12] availability in terms of pure flow. [11:15] However, there was a need for treatment [11:17] for um detected levels of manganesees [11:19] and POS. Um we are still undergoing [11:22] hydro uh geological investigations at [11:24] Beach Pond uh to determine if a viable [11:27] water source exists. We received [11:30] preliminary findings again on the [11:32] village center um system. Um, while a a [11:36] water system may be technically feasible [11:39] in the village center, meaning that we [11:41] have enough water for a community water [11:42] system, the capital costs that would be [11:45] associated with developing um a [11:48] permanent uh public water system uh [11:51] supply system in the village area [11:53] appears to be prohibitively expensive [11:55] for the town to take on. Um and and you [11:59] know so as a result of this this expense [12:03] um the pursuing a public water system in [12:06] the village center does not appear to be [12:08] a practical investment for the town [12:10] unless significant and we mean [12:12] significant outside funding was [12:14] available for implementation. Um so at [12:17] this time town leadership has decided [12:18] not to pursue any additional funding for [12:21] the village center component. Um we will [12:24] be having uh we we again as I said we [12:26] are not done with the beach pond study. [12:28] When that study is wrapped up we will [12:31] provide uh additional public information [12:32] at that time when that component of the [12:35] study um comp concludes. I'd also just [12:38] like to note um that we have we have [12:40] been maintaining a uh a page on our [12:44] community website the town website uh [12:46] providing updates on the water system [12:48] study. So people can people can check in [12:50] on that. But again the the bottom line [12:52] is the first phase of this study [12:55] focusing on village center revealed [12:58] sufficient water but the capital costs [13:00] for implementation were were deemed too [13:02] high and we will not be pursuing further [13:05] um uh you know studies or or engineering [13:08] along this this line in the village. So [13:11] happy to answer any questions that [13:12] people may have. [13:15] » John, how much was the significant [13:17] capital cost for us to go further with [13:19] this study? Um, yeah, it was it was in [13:22] the range of uh 15 to $18 million [13:26] » To basically stand up the the system. [13:30] » Thank you. [13:36] » A lot of that I mean a lot of that you [13:38] know infrastructure is expensive but a [13:40] lot of that had to deal with uh you know [13:42] building out water treatment capacity [13:44] and and storage and and that sort of [13:46] thing. [13:48] Who would maintain something like that? [13:51] I think there would be a reoccurring [13:52] flaw. [13:53] » It would be maintained most likely [13:56] again if we were to consider something [13:58] like that. And I want to reiterate at [13:59] this time we are not. Um it would be [14:02] maintained by the Connecticut Water [14:04] Company who is designated by the [14:07] Department of Public Health to be the [14:08] exclusive service provider for public [14:10] water systems in this municipality. [14:13] So we we could essentially build it and [14:16] then turn it over to Connecticut water [14:17] to maintain. [14:21] So similar there is there is a small [14:22] water system out near Beach Pond um [14:25] Tangle Wood a couple of roads over there [14:27] that is a small community system [14:28] maintained by Connecticut Water [14:33] » And those residents receive a bill from [14:35] Connecticut Water. Correct. [14:36] » Precisely as as they would for any other [14:38] utility. So that's not a reoccurring [14:42] budget line item [14:43] » On the town. No, but it would then be [14:45] anyone connected to it would get a war a [14:47] monthly water. [14:50] » Pretty big [clears throat] amount of [14:51] money to put out, [14:53] » Which is why we have chosen at this time [14:55] to not [14:57] » You wouldn't get any return on it. [14:59] » It's well a public water system is not [15:01] intended to be a money-making operation. [15:03] It's a utility, [15:06] » Right? It's [15:08] the reason why we even looked at this [15:10] originally was because of the [15:12] possibility of future economic [15:15] development and growth in the town [15:16] center. Um some of the mandates from the [15:19] state around um changing zoning so that [15:23] um we could change from single family [15:25] dwellings to multif family dwellings in [15:27] town center. Um, but with that sort of [15:30] cost, [15:31] that's a oh no, because right now it's [15:34] cost the town nothing to do the study. [15:36] » Right. Right. Right. Right. [15:38] » So, and we've gotten an answer out of [15:39] the study on the village center. We'll [15:42] get an answer on Beach Pond. So, we'll [15:45] talk about that when that happens. But [15:48] » That would have to be a real good will, [15:55] right? [15:57] Exactly. What area of the beach are you [16:01] talking about? [16:03] » Um John, [16:05] » Yeah, it's it's basically basically the [16:08] [clears throat] Bennett Road, Bennett [16:09] Circle area, [16:10] » The the the properties. Um, and I mean [16:12] we I think we may expand uh expand just [16:16] the the um cost estimates to the [16:20] northshore of Beach Pond also, but the [16:23] initial study was intended to be [16:25] basically the the the Bennett Road, [16:27] Bennett Circle area, you know, the areas [16:29] just immediately south of the pond [16:31] itself, [16:33] the high, you know, the area of highest [16:34] residential density. [16:36] » And it's not an area where you can bring [16:38] in multif family homes. I mean, [16:39] everything's stacked in there. Well, in [16:41] in the Beach Pond area, the idea there [16:44] is recognizing that the the properties [16:46] are developed at at quite an a a a high [16:50] density. Um those are seasonal cottages [16:54] that have gradually and continue to be [16:56] converted from seasonal, you know, [16:58] one-bedroom, two-bedroom cottages to [17:01] three, four, fivebedroom year-round [17:03] houses [17:04] um that that have a significantly higher [17:07] water demand and more importantly [17:09] require by public health code [17:11] significant separation distances between [17:13] water systems and septic systems. So [17:17] that sign that that that that uh public [17:19] health code significantly um hinders [17:23] people's ability to essentially build [17:25] out their property and invest in their [17:27] property uh making improvements and [17:29] frankly making their properties more [17:31] valuable in a way that is you know good [17:33] for the town's grand list. Um and so [17:36] because of public health limitations, [17:39] you know, sometimes those building [17:40] expansions are h h h h h h h h h h h h h [17:42] h h h h h h h h h h h h h h h h h h h h [17:42] h h h h h h h hindered. And so the idea [17:43] is if we can bring in public water, we [17:46] can reduce the separation distance [17:48] burden and and allow people to develop [17:50] at a a more robust level [17:56] properties that you could do that with. [17:58] » I'm sorry. [17:59] » Do you have a count number of properties [18:02] that could possibly do that? We didn't [18:04] do a property bypropy analysis. We just [18:07] basically drew a circle around the [18:09] highest density of residential [18:12] properties and said these would be the [18:13] ones that would be included in a public [18:15] water system study. Again, this is just [18:18] a planning exercise. [18:22] » So that's two separate systems, [18:25] » A system and a pond system. [18:27] » Correct. And so we we've completed the [18:29] the research on the village system. the [18:31] beach pond system is is you know another [18:33] six weeks behind [18:45] » Any additional questions [18:48] I ask question did the town ever look at [18:51] um [18:53] the opposite situation where you [18:56] provided a mutual septic tank instead [19:00] instead of dealing with the well issue [19:03] because um [19:06] that also has a separate things [19:09] » Going on. [19:11] » Sure. So we did we did at the initial [19:14] planning stages uh consider that I mean [19:18] so you know if you're looking to do a [19:20] some sort of public infrastructure [19:22] system either a public water system or a [19:24] public sewer system either of those [19:27] would help alleviate the uh development [19:30] constraints. However in very broad [19:33] strokes a sewer system is an order of [19:36] magnitude more expensive than a public [19:38] water system. Um because you not only [19:41] have to do all the pipes that you would [19:43] for a water system, you also have to [19:44] build a water treatment facility um a [19:47] sewer plant and and so you know whereas [19:50] in in rough numbers you know if if uh a [19:53] water system in the village is going to [19:54] cost us $15 million, a sewer plant would [19:58] cost us $75 million. Like and so we you [20:01] know knowing knowing those those just [20:03] how expensive [20:05] » Sewer treatment is versus water. [20:07] » Yeah. versus a a larger septic system [20:12] which would be pumped out which the [20:14] homeowners could pay a fee to have have [20:18] maintained and pumped out every year. [20:20] Not [20:21] » Sure. And so a community [20:23] » Not a whole full-blown sewer system, [20:25] » Right? There's there Yes, we could we [20:28] could look at I mean that is something [20:29] that could be looked at a community [20:32] waste comm basically a community septic [20:34] system like a um that would be certainly [20:38] cheaper than a full-blown sewer system [20:40] but it's its size constraints would be [20:45] quite low compared to I mean even the [20:48] number of houses there right now you you [20:50] wouldn't be able to get that number of [20:53] houses on a you know a traditional [20:56] community system, even if you had, you [20:58] know, a bunch of acres for a, you know, [21:01] a perfectly designed septic leech field. [21:04] Not that you've got the the space, you [21:08] know, I don't know where down there you [21:09] would be able to size a leech field that [21:12] big. Um, but yeah, I mean, that's that's [21:15] a consideration. Not, you know, falling [21:18] short of a full sewer plant. Yes. Um, [21:22] but we we just didn't see that as [21:24] feasible for the the type of study we [21:27] wanted to do with this money at this [21:28] time. That could could be something we [21:29] look at in the future. And then the only [21:31] other question is a zoning question [21:33] where a lot of towns if someone owns a [21:37] small lot which can't be [21:40] um built on because it's too small or [21:43] they don't have the room for another [21:44] well or another septic system but they [21:47] own an adjacent adjacent lot and want to [21:51] upgrade their property. There's some [21:53] towns that require that the homeowner [21:56] combined the lots to make the lot more [21:59] conforming. [22:02] » Is that a question or a statement? [22:03] » No, that's one way of alleviating um too [22:07] much buildup of the pond because you [22:10] still people building up and adding [22:12] bathrooms and adding all this stuff. [22:16] » [clears throat] [22:16] » You still have se you're still close to [22:18] the pond and so you still have leech [22:21] leeching water that goes down to the [22:23] pond because everything just about on [22:26] that pond is uphill from the pond. So if [22:30] you're building bigger houses with [22:32] bigger bathrooms, going from cottages to [22:36] full-blown houses that are twostory or [22:39] threetory, [22:41] five, you know, five bedrooms and four [22:43] bathrooms or whatever it is, you're [22:46] adding beach water into the pond, which [22:49] is a big concern because [22:52] um this is [22:54] the quality of the water. Pretty sure [22:56] everything down there pretty much is [22:58] engineered septic now if you're building [22:59] the doors or something. [23:01] » There's a lot of smaller cottages that [23:03] are not. [23:04] » Yeah, but you're not going from a [23:05] onebedroom to a fivebedroom without any [23:08] septic. I don't [23:09] » No, you're not. But but some people we [23:13] did it. We went up, but we still [23:15] maintained it was a threebedroom. [23:18] We maintain the three bedroomedroom, but [23:20] there are some places that are smaller, [23:23] a smaller lot and [23:28] some with old septic systems. I don't [23:30] know if you've ever seen soap suds that [23:32] run along the pond. [23:35] » Yeah. [23:37] Every weekend. [23:40] Just it's just what do you want? Do you [23:42] want more development? Do you want the [23:45] houses to be worth more? just want [23:47] people to be able to maintain their [23:49] houses or do you want the pond to have [23:52] maintain its quality of water [23:56] um in the long term because of um tax [24:00] dollars down there and tourism and all [24:04] the fun people have down there in the [24:06] summer fun [24:08] or is it just benefiting a few people [24:11] for all this money? We want all of the [24:14] above for Nevada. [24:18] » Great. [24:21] » All right. So, John, since I got you on [24:24] uh we got the proposed proposed [24:26] extinguishment of the second Oh, there [24:29] was one more question. [24:30] » Yeah. I I want this just one thing about [24:32] the water the water system. I know it's [24:33] all preliminary and I know the engineers [24:35] and all probably looked at this. I [24:37] looked at a lot of the paperwork, a lot [24:38] of the first study that was done, what [24:40] was available in the least. One thing I [24:42] didn't see in there take into account [24:43] and I know the city chiefs the study is [24:46] uh up in Massachusetts a lot of towns [24:49] went through the same problem uh over [24:52] the decades and they put city water in [24:54] to solve a lot of the problems. In 20 [24:57] years they have more problems because [24:59] you have to take into account when you [25:01] pump water out to different locations [25:03] you have to raise the water table six [25:05] feet in a town and all the septics fail [25:08] because [25:10] you're pumping water to all these [25:11] locations. So the hydra all hydrarology [25:14] and everything else has to take into [25:15] account theoretically all that water [25:18] being put to a different location in [25:19] this. understand we ended up paying $50 [25:22] million for the septic system for the uh [25:25] sewer. Lucky though you're next to a [25:27] large city. So a large city took the [25:30] treatment. So we don't have a large city [25:33] nearby to pipe it to. So that's just [25:36] something I just didn't see in in the [25:38] study. I just chiming in from what what [25:40] I've seen is that that hit me in the [25:42] pocket quite hard when that when that [25:45] happened in North Dakota. So got very [25:48] very expensive to to connect because we [25:51] have a bond that would be just pointing [25:53] that out. [25:55] » Thank you. [25:58] » John, you still there? [26:01] » I am. [26:01] » Okay. Uh a proposed extinguishment of [26:04] the town's right away to Old Econ Road. [26:12] Um what where did we come up with that? [26:17] Um that was a request uh made by um a [26:22] Butters uh on Old Econ Road folks that [26:25] basically have an old road rightway [26:27] still under the control and ownership of [26:29] the municipality [26:31] um that was sort of handed over to the [26:32] town when the state rebuilt 49 and [26:35] rerouted it. there's a little eyebrow of [26:38] a road that basically runs through a [26:41] couple of people's backyards. and they [26:43] made the inquiry and request um that [26:45] since the town clearly does not use nor [26:48] need this that it be formally [26:51] extinguished and the the legal term is [26:53] discontinued [26:55] um so that the town can divest itself of [26:57] that property um which it does not use [27:00] nor need nor need the liability on um [27:03] and basically hand it off to the uh [27:06] abuing property owners so that they can [27:08] own it in fee simple. Um, this was the [27:11] request made. Um, the board of selectmen [27:13] considered this and referred it to the [27:15] planning and zoning commission for [27:18] what's referred to as an 824 referral. [27:21] Um, referencing Connecticut General [27:23] Statute section 8-24. [27:25] Um, the planning and zoning commission [27:26] determined that this um extinguishment [27:29] of the road uh formally through [27:31] discontinuation was appropriate and was [27:34] in keeping with the goals of the plan of [27:36] conservation and development. um they [27:38] encourage the selectman to move forward [27:40] on it. And um in order to do so uh if [27:44] the selectman wish to continue, the [27:46] selectmen need to um schedule a town [27:50] meeting to formally [27:52] um vote to discontinue the road. Uh and [27:56] there are some you know legal [27:58] notifications in the newspaper, legal [28:00] notifications to the abutters as well as [28:02] signage posted to properly notify the [28:05] municipality of its intent. Um but that [28:09] this would be basically a formal action [28:11] requiring a majority town meeting vote [28:14] uh essentially to extinguish and say the [28:17] town no longer has interest legal [28:19] interest in uh this right of way. [28:36] All right. So, how's um September 22nd [28:40] for a town meeting for this? [28:45] » John, does that give us enough time at [28:47] 60 days from tonight? [28:48] » Yeah. Yeah. you basically need um to [28:50] notify a Butters uh 30 days prior um and [28:55] post assigned 30 days prior and then you [28:58] know you need to because it's a town [28:59] meeting you need to legally notice it in [29:01] the paper um twice ahead of time at [29:04] least 15 days. So yes, two months out [29:06] gives you plenty of time. [29:11] I make a motion that we set a the town [29:14] meeting for the uh discontinuence of Old [29:17] Econ Road under an 824 referral to [29:21] September 22nd, 2026. [29:24] » All in favor? [29:26] » I [29:29] have a 22nd town meeting. [29:31] » Yep. [29:33] At 7 p.m. [29:39] here [29:42] at town hall. [29:52] Thanks, John. [29:54] » Okay, thanks folks. [29:57] Okay, [29:57] » Next the chip ceiling guys are supposed [29:59] to be here. Are they here? [30:01] » They did not show up, so we can't talk [30:04] to them, which is great. [30:10] Uh, let's do tax movement. [30:14] We talked about the chips dealing with [30:15] that. I'm I I'll talk with the guys. [30:18] I'll talk why they're not here tonight. [30:21] So, that's not but but the company was [30:25] supposed to be here tonight. The [30:26] representatives of the company and [30:31] maybe the weather. There's [30:32] » A miscommunication on the time I just [30:34] dropped on. And they think the meeting [30:37] is at 7, [30:39] but they should be on their way. [30:43] They didn't know the meeting was 6. They [30:45] thought it was seven. Okay, hold on. [30:52] » Let's reschedu with them. [30:54] » Oh, the 22nd with them, too. [30:57] You want to do that? [30:58] » Add them to September 22nd. [31:00] » Okay. Okay. [31:02] » Was this a town meeting or a selectman's [31:04] meeting? [31:05] » Public hearing. [31:06] » Public hearing. [31:07] » What does it say on the new board up [31:10] there? [31:10] » Says on the website. [31:12] » What does No. What does it say? Town [31:13] meeting. [31:14] » Public hearing. [31:16] » It says town meeting on the board. That [31:17] That is a mistake that we fully take [31:21] responsibility for and acknowledge. But [31:23] this is a public hearing. The newspaper [31:25] and the town website stated it was just [31:27] the board that was the mistake. [31:30] And that's the one that doesn't have a [31:32] legal requirements. Not trying to get [31:34] out of anything, but that's then don't [31:36] try and get out of it. No, we're not [31:38] trying to get out of it. We We take the [31:40] hit. [31:42] » Doors are always open. You want to come [31:44] in, talk, whatever. [31:45] » Well, no. I I read it. [31:46] » Yep. I'm going to stay. [31:49] » Oh, okay. That's fair. [31:53] » All right. Uh, let's do the Where do we [31:56] have three more? [31:58] Four. [31:59] Yeah. [32:06] First one [32:08] is for Robert Engel Jr. for 3145 [32:18] 11:45. [32:21] Second one is for Toyota lease trust for [32:25] 19730. [32:29] Third one is for [32:32] Sean Douly founding road volunt 40 52 [32:38] $4052 [32:41] and the last one Donna stole of condon [32:44] road and that one is $4488. [32:49] I make a motion to issue tax refunds as [32:52] recommended by the tax collector. [32:55] » Second. [32:55] » All in favor? Hi, [33:15] Make them.